WorldWideScience

Sample records for facility hvac system

  1. TNO HVAC facilities

    NARCIS (Netherlands)

    Hammink, H.A.J.

    2015-01-01

    TNO has extensive knowledge of heating, ventilation and air conditioning (HVAC), and can offer its services through theoretical studies, laboratory experiments and field measurements. This complete scope, made possible through our test facilities, enables the effective development of new products,

  2. TNO HVAC facilities

    NARCIS (Netherlands)

    Hammink, H.A.J.

    2015-01-01

    TNO has extensive knowledge of heating, ventilation and air conditioning (HVAC), and can offer its services through theoretical studies, laboratory experiments and field measurements. This complete scope, made possible through our test facilities, enables the effective development of new products, i

  3. HVAC systems design handbook

    CERN Document Server

    Haines, Roger W

    2010-01-01

    Thoroughly updated with the latest codes, technologies, and practices, this all-in-one resource provides details, calculations, and specifications for designing efficient and effective residential, commercial, and industrial HVAC systems. HVAC Systems Design Handbook, Fifth Edition, features new information on energy conservation and computer usage for design and control, as well as the most recent International Code Council (ICC) Mechanical Code requirements. Detailed illustrations, tables, and essential HVAC equations are also included. This comprehensive guide contains everything you need to design, operate, and maintain peak-performing HVAC systems.

  4. Next Generation HVAC System

    Science.gov (United States)

    Takagi, Yasuo; Murakami, Yoshiki; Hanada, Yuuichi; Nishimura, Nobutaka; Yamazaki, Kenichi; Itoh, Yasuyuki

    A new HVAC (Heating, Ventilating, and Air-Conditioning) system for buildings is proposed. The key technology for the system is a twin coil air handling unit (AHU) and its advanced control method. One coil is equipped to cool and dehumidify the fresh air intake, and the other coil is for cooling circulated air. The deeply chilled water is necessary only for removing the moisture from the fresh air. The latter coil requires moderately cool water according to the HVAC load. Then 2 kinds of chilled water in terms of temperature should be prepared. The structure helps saving the energy consumption for air-conditioning because the higher chilled water temperature implies the better chiller efficiency (COP: Coefficient of Performance). In addition, an advanced control method that is called an ‘Air-Water cooperation system’ is introduced. The control system mainly focuses on energy savings through changing the temperature of the chilled water and supply air according to the HVAC load and weather conditions. In this paper, we introduce a Next Generation HVAC system with its control system and present evaluation results of the system for the model-building simulator.

  5. HVAC control system for building automation

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. S.; Song, I. T.; Cho, S. W.; Cho, J. H. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-11-01

    The purpose of the project is to design and construction of the HVAC control system for building automation. The HVAC control system can accomplish the function which are the optimum operation condition and operation time, and the operation pattern analysis. Also, this control system can effectively manage energy saving, building environment control, facilities safety monitoring etc. The HVAC control system consisted of the central control and monitoring system (CCMS) and the direct digital controller (DDC). 1) CCMS: -Main Compute -Graphic Board -Printer -Console Desk -Intercom. 2) DDC : -IMC-M (System Control Unit Main Module) -IMC-1,2,3,4(System Control Unit Module). Following this report will be used important data for the design, construction, operation and maintenance of the HVAC control system. 12 refs., 6 figs., 9 tabs. (Author)

  6. [Air quality control systems: heating, ventilating, and air conditioning (HVAC)].

    Science.gov (United States)

    Bellucci Sessa, R; Riccio, G

    2004-01-01

    After a brief illustration of the principal layout schemes of Heating, Ventilating, and Air Conditioning (HVAC), the first part of this paper summarizes the standards, both voluntary and compulsory, regulating HVAC facilities design and installation with regard to the question of Indoor Air Quality (IAQ). The paper then examines the problem of ventilation systems maintenance and the essential hygienistic requirements in whose absence HVAC facilities may become a risk factor for people working or living in the building. Lastly, the paper deals with HVAC design strategies and methods, which aim not only to satisfy comfort and air quality requirements, but also to ensure easy and effective maintenance procedures.

  7. HVAC optimization as facility requirements change with corporate restructuring

    Energy Technology Data Exchange (ETDEWEB)

    Rodak, R.R.; Sankey, M.S.

    1997-06-01

    The hyper-competitive, dynamic 1990`s forced many corporations to {open_quotes}Right-Size,{close_quotes} relocating resources and equipment -- even consolidating. These changes led to utility reduction if HVAC optimization was thoroughly addressed, and energy conservation opportunities were identified and properly designed. This is true particularly when the facility`s heating and cooling systems are matched to correspond with the load changes attributed to the reduction of staff and computers. Computers have been downsized and processing power per unit of energy input increased, thus, the need for large mainframe computer centers, and their associated high intensity energy usage, have been decreased or eliminated. Cooling, therefore, also has been reduced.

  8. Towards Autonomous Control of HVAC Systems

    DEFF Research Database (Denmark)

    Brath, P.

    This thesis considered development of an autonomous control system for heating ventilation and air conditioning applications. By including auto-tuning, adaptation, diagnosis and supervision functions in the control system used in the HVAC industry will move the control of HVAC systems towards...... autonomous control. Together with better tuned controllers and more dedicated control it would be possible to decrease the energy consumption, save money and increase the indoor air climate. A flexible HVAC test system was designed and implemented. Standard components and sensors were used in the design...

  9. HVAC systems in shopping centers as a utility business

    Energy Technology Data Exchange (ETDEWEB)

    Wolfert, J.E.

    1985-01-01

    Retail spaces in shopping centers have been noted for their low-cost and medium-quality HVAC systems. Typically, these systems are installed with minimal engineering and provided with less maintenance. There are, however, methods of providing higher quality HVAC systems for these retail spaces. One method is for the developer to provide a central plant type system and redistribute HVAC services for these spaces. The central plant system can redistribute chilled water, heated water, chilled air, heated air, tower water, electricity, or any other readily transportable energy source. With central type services, the economics are such that the individual retailer experiences no more overall cost but receives the benefits of a higher quality system. The developer has a larger investment but receives a reasonable return on this additional investment. The utilities now service a building that has a lower demand and a higher load factor. And society as a whole is presented with a facility that is considerably more energy efficient.

  10. Optimal Model-Based Control in HVAC Systems

    DEFF Research Database (Denmark)

    Komareji, Mohammad; Stoustrup, Jakob; Rasmussen, Henrik;

    2008-01-01

    This paper presents optimal model-based control of a heating, ventilating, and air-conditioning (HVAC) system. This HVAC system is made of two heat exchangers: an air-to-air heat exchanger (a rotary wheel heat recovery) and a water-to- air heat exchanger. First dynamic model of the HVAC system...

  11. Selecting HVAC Systems for Schools To Balance the Needs for Indoor Air Quality, Energy Conservation and Maintenance. Technical Bulletin.

    Science.gov (United States)

    Wheeler, Arthur E.; Kunz, Walter S., Jr.

    Although poor air quality in a school can have multiple causes, the heating, ventilating, and air-conditioning (HVAC) system plays a major role. Suggestions that architects, facilities managers, school board members, and administrators can use in selecting HVAC systems are discussed. Focus is on the performance criteria for classroom systems, and…

  12. Selecting HVAC Systems for Schools To Balance the Needs for Indoor Air Quality, Energy Conservation and Maintenance. Technical Bulletin.

    Science.gov (United States)

    Wheeler, Arthur E.; Kunz, Walter S., Jr.

    Although poor air quality in a school can have multiple causes, the heating, ventilating, and air-conditioning (HVAC) system plays a major role. Suggestions that architects, facilities managers, school board members, and administrators can use in selecting HVAC systems are discussed. Focus is on the performance criteria for classroom systems, and…

  13. Intelligent control of HVAC systems. Part I: Modeling and synthesis

    Directory of Open Access Journals (Sweden)

    Adrian TOADER

    2013-03-01

    Full Text Available This is the first part of a work on intelligent type control of Heating, Ventilating and Air-Conditioning (HVAC systems. The study is performed from the perspective of giving a unitary control method to ensure high energy efficiency and air quality improving. To illustrate the proposed HVAC control technique, in this first part it is considered as benchmark problem a single thermal space HVAC system. The construction of the mathematical model is performed only with a view to obtain a framework of HVAC intelligent control validation by numerical simulations. The latter will be reported in a second part of the study.

  14. Why, when and how do HVAC-systems pollute? Characterisation of HVAC-systems related pollution

    NARCIS (Netherlands)

    Bluyssen, P.M.; Björkroth, M.; Müller, B.; Oliveira Fernandes, E. de; Roulet, C.A.

    2000-01-01

    In the beginning of 1998 a three-year European project, AIRLESS, was started to develop strategies, principles and protocols to improve and control the performance of HVAC-systems and its components for incorporation in codes and guidelines. Twelve institutes, universities and companies from seven

  15. Maintenance of HVAC-systems and components: How to prevent pollution from HVAC-systems?

    NARCIS (Netherlands)

    Müller, B.; Björkroth, M.; Plitt, U.; Bluyssen, P.M.

    2000-01-01

    In the beginning of 1998 a three-year European project, AIRLESS, was started to develop strategies, principles and protocols to improve and control the performance of HVAC-systems and its components for incorporation in codes and guidelines. Twelve institutes, universities and companies, from seven

  16. Ontology for Life-Cycle Modeling of Heating, Ventilating, and Air Conditioning (HVAC) Systems: Experimental Applications Using Revit

    Science.gov (United States)

    2012-03-01

    Center, Construction Engineering Research Laboratory (ERDC-CERL) has developed a core life- cycle building information model ( BIM ) based on three...was to promote consistency and quality of content created for Building Information Models ( BIMs ) across various disciplines. The HVAC MVD was...MVD. 15. SUBJECT TERMS building information modeling ( BIM ), ontology, Army facilities, heating, ventilating, and air-conditioning (HVAC) systems

  17. RELIABILITY ANALYSIS OF THE ELECTRICAL POWER DISTRIBUTION SYSTEM TO SELECTED PORTIONS OF THE NUCLEAR HVAC SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    N. Ramirez

    2004-12-16

    A design requirement probability of 0.01 or less in a 4-hour period ensures that the nuclear heating, ventilation, and air-conditioning (HVAC) system in the primary confinement areas of the Dry Transfer Facilities (DTFs) and Fuel Handling Facility (FHF) is working during a Category 1 drop event involving commercial spent nuclear fuel (CSNF) assemblies (BSC 2004a , Section 5.1.1.48). This corresponds to an hourly HVAC failure rate of 2.5E-3 per hour or less, which is contributed to by two dominant causes: equipment failure and loss of electrical power. Meeting this minimum threshold ensures that a Category 1 initiating event followed by the failure of HVAC is a Category 2 event sequence. The two causes for the loss of electrical power include the loss of offsite power and the loss of onsite power distribution. Thus, in order to meet the threshold requirement aforementioned, the failure rate of mechanical equipment, loss of offsite power, and loss of onsite power distribution must be less than or equal to 2.5E-3 per hour for the nuclear HVAC system in the primary confinement areas of the DTFs and FHF. The loss of offsite power occurs at a frequency of 1.1E-5 per hour (BSC 2004a, Section 5.1.1.48). The purpose of this analysis is to determine the probability of occurrence of the unavailability of the nuclear HVAC system in the primary confinement areas of the DTFs and FHF due to loss of electrical power. In addition, this analysis provides insights on the contribution to the unavailability of the HVAC system due to equipment failure. The scope of this analysis is limited to finding the frequency of loss of electrical power to the nuclear HVAC system in the primary confinement areas of the DTFs and FHF.

  18. Design Concepts for Optimum Energy Use in HVAC Systems.

    Science.gov (United States)

    Electric Energy Association, New York, NY.

    Much of the innovative work in the design and application of heating, ventilating, and air conditioning (HVAC) systems is concentrated on improving the cost effectiveness of such systems through optimizing energy use. One approach to the problem is to reduce a building's HVAC energy demands by designing it for lower heat gains and losses in the…

  19. Optimal Set-Point Synthesis in HVAC Systems

    DEFF Research Database (Denmark)

    Komareji, Mohammad; Stoustrup, Jakob; Rasmussen, Henrik

    2007-01-01

    components, encompassing fans, primary/secondary pump, tertiary pump, and air-to-air heat exchanger wheel; and a fraction of thermal power used by the HVAC system. The goals that have to be achieved by the HVAC system appear as constraints in the optimization problem. To solve the optimization problem......This paper presents optimal set-point synthesis for a heating, ventilating, and air-conditioning (HVAC) system. This HVAC system is made of two heat exchangers: an air-to-air heat exchanger and a water-to-air heat exchanger. The objective function is composed of the electrical power for different......, a steady state model of the HVAC system is derived while different supplying hydronic circuits are studied for the water-to-air heat exchanger. Finally, the optimal set-points and the optimal supplying hydronic circuit are resulted....

  20. Real-time supervision of building HVAC system performance

    Energy Technology Data Exchange (ETDEWEB)

    Djuric, Natasa

    2008-07-01

    This thesis presents techniques for improving building HVAC system performance in existing buildings generated using simulation-based tools and real data. Therefore, one of the aims has been to research the needs and possibilities to assess and improve building HVAC system performance. In addition, this thesis aims at an advanced utilization of building energy management system (BEMS) and the provision of useful information to building operators using simulation tools. Buildings are becoming more complex systems with many elements, while BEMS provide many data about the building systems. There are, however, many faults and issues in building performance, but there are legislative and cost-benefit forces induced by energy savings. Therefore, both BEMS and the computer-based tools have to be utilized more efficiently to improve building performance. The thesis consists of four main parts that can be read separately. The first part explains the term commissioning and the commissioning tool work principal based on literature reviews. The second part presents practical experiences and issues introduced through the work on this study. The third part deals with the computer-based tools application in design and operation. This part is divided into two chapters. The first deals with improvement in the design, and the second deals with the improvement in the control strategies. The last part of the thesis gives several rules for fault diagnosis developed using simulation tools. In addition, this part aims at the practical explanation of the faults in the building HVAC systems. The practical background for the thesis was obtained though two surveys. The first survey was carried out with the aim to find the commissioning targets in Norwegian building facilities. In that way, an overview of the most typical buildings, HVAC equipment, and their related problems was obtained. An on-site survey was carried out on an example building, which was beneficial for introducing the

  1. HVAC systems in a field laboratory for indoor climate study

    DEFF Research Database (Denmark)

    Fang, Lei; Melikov, Arsen Krikor; Olesen, Bjarne W.

    2012-01-01

    This paper presents the design of a HVAC system for a field lab. The design integrated mixing ventilation, displacement ventilation, low impulse vertical ventilation, personalized ventilation, natural ventilation, hybrid ventilation, active chilled beams, radiant ceiling and floor, and heat...

  2. Review of Residential Low-Load HVAC Systems

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Scott A.; Thornton, Brian; Widder, Sarah H.

    2013-09-01

    In support of the U.S. Department of Energy’s (DOE’s) Building America Program, Pacific Northwest National Laboratory (PNNL) conducted an investigation to inventory commercially available HVAC technologies that are being installed in low-load homes. The first step in this investigation was to conduct a review of published literature to identify low-load HVAC technologies available in the United States and abroad, and document the findings of existing case studies that have evaluated the performance of the identified technologies. This report presents the findings of the literature review, identifies gaps in the literature or technical understanding that must be addressed before low-load HVAC technologies can be fully evaluated, and introduces PNNL’s planned research and analysis for this project to address identified gaps and potential future work on residential low-load HVAC systems.

  3. [Analysis and research on cleaning points of HVAC systems in public places].

    Science.gov (United States)

    Yang, Jiaolan; Han, Xu; Chen, Dongqing; Jin, Xin; Dai, Zizhu

    2010-03-01

    To analyze cleaning points of HVAC systems, and to provides scientific base for regulating the cleaning of HVAC systems. Based on the survey results on the cleaning situation of HVAC systems around China for the past three years, we analyzes the cleaning points of HVAC systems from various aspects, such as the major health risk factors of HVAC systems, the formulation strategy of the cleaning of HVAC systems, cleaning methods and acceptance points of the air ducts and the parts of HVAC systems, the onsite protection and individual protection, the waste treatment and the cleaning of the removed equipment, inspection of the cleaning results, video record, and the final acceptance of the cleaning. The analysis of the major health risk factors of HVAC systems and the formulation strategy of the cleaning of HVAC systems is given. The specific methods for cleaning the air ducts, machine units, air ports, coil pipes and the water cooling towers of HVAC systems, the acceptance points of HVAC systems and the requirements of the report on the final acceptance of the cleaning of HVAC systems are proposed. By the analysis of the points of the cleaning of HVAC systems and proposal of corresponding measures, this study provides the base for the scientific and regular launch of the cleaning of HVAC systems, a novel technology service, and lays a foundation for the revision of the existing cleaning regulations, which may generate technical and social benefits to some extent.

  4. Real-time supervision of building HVAC system performance

    Energy Technology Data Exchange (ETDEWEB)

    Djuric, Natasa

    2008-07-01

    This thesis presents techniques for improving building HVAC system performance in existing buildings generated using simulation-based tools and real data. Therefore, one of the aims has been to research the needs and possibilities to assess and improve building HVAC system performance. In addition, this thesis aims at an advanced utilization of building energy management system (BEMS) and the provision of useful information to building operators using simulation tools. Buildings are becoming more complex systems with many elements, while BEMS provide many data about the building systems. There are, however, many faults and issues in building performance, but there are legislative and cost-benefit forces induced by energy savings. Therefore, both BEMS and the computer-based tools have to be utilized more efficiently to improve building performance. The thesis consists of four main parts that can be read separately. The first part explains the term commissioning and the commissioning tool work principal based on literature reviews. The second part presents practical experiences and issues introduced through the work on this study. The third part deals with the computer-based tools application in design and operation. This part is divided into two chapters. The first deals with improvement in the design, and the second deals with the improvement in the control strategies. The last part of the thesis gives several rules for fault diagnosis developed using simulation tools. In addition, this part aims at the practical explanation of the faults in the building HVAC systems. The practical background for the thesis was obtained though two surveys. The first survey was carried out with the aim to find the commissioning targets in Norwegian building facilities. In that way, an overview of the most typical buildings, HVAC equipment, and their related problems was obtained. An on-site survey was carried out on an example building, which was beneficial for introducing the

  5. Energy-Efficient Building HVAC Control Using Hybrid System LBMPC

    CERN Document Server

    Aswani, Anil; Taneja, Jay; Krioukov, Andrew; Culler, David; Tomlin, Claire

    2012-01-01

    Improving the energy-efficiency of heating, ventilation, and air-conditioning (HVAC) systems has the potential to realize large economic and societal benefits. This paper concerns the system identification of a hybrid system model of a building-wide HVAC system and its subsequent control using a hybrid system formulation of learning-based model predictive control (LBMPC). Here, the learning refers to model updates to the hybrid system model that incorporate the heating effects due to occupancy, solar effects, outside air temperature (OAT), and equipment, in addition to integrator dynamics inherently present in low-level control. Though we make significant modeling simplifications, our corresponding controller that uses this model is able to experimentally achieve a large reduction in energy usage without any degradations in occupant comfort. It is in this way that we justify the modeling simplifications that we have made. We conclude by presenting results from experiments on our building HVAC testbed, which s...

  6. HVAC system simulation: use of condensed input data

    Energy Technology Data Exchange (ETDEWEB)

    Hanby, V.I.; Round, M. (Loughborough Univ. of Technology (United Kingdom))

    1992-01-01

    In many applications of HVAC system simulation, results are required over an extended time period. For example, long-term energy use predictions are frequently needed in a design context for comparison of alternative plant configurations and they are also necessary in plant optimisation studies where the objective function to be minimised contains energy-use terms. These are typical application areas which have involved the use of SPATS, a modular, steady-state HVAC plant simulation program developed at Loughborough University. The computation time involved in generating long-run performance figures has prompted an investigation of ways in which such results can be generated more quickly. SPATS was conceived and developed for performance simulation of HVAC systems at the design stage and although a dynamic zone model has recently been implemented, the main use of SPATS has been to examine the performance of mechanical systems and subsystems over a range of load conditions. (Author).

  7. COMPARATIVE STUDY AMONG HYBRID GROUND SOURCE HEAT PUMP SYSTEM, COMPLETE GROUND SOURCE HEAT PUMP AND CONVENTIONAL HVAC SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Jiang Zhu; Yong X. Tao

    2011-11-01

    In this paper, a hotel with hybrid geothermal heat pump system (HyGSHP) in the Pensacola is selected and simulated by the transient simulation software package TRNSYS [1]. To verify the simulation results, the validations are conducted by using the monthly average entering water temperature, monthly facility consumption data, and etc. And three types of HVAC systems are compared based on the same building model and HVAC system capacity. The results are presented to show the advantages and disadvantages of HyGSHP compared with the other two systems in terms of energy consumptions, life cycle cost analysis.

  8. Hybrid HVAC systems with chemical dehumidification for supermarket applications

    Energy Technology Data Exchange (ETDEWEB)

    Capozzoli, Alfonso; Mazzei, Pietro; Minichiello, Francesco; Palma, Daniele [DETEC, University of Naples Federico II, P.le Tecchio, 80, 80125 Naples (Italy)

    2006-06-15

    HVAC systems in supermarkets must assure both thermal comfort for occupants and suitable climatic conditions for refrigerated cases, which operate better with low ambient relative humidity (40-45%). Since open display cases substantially reduce sensible load and moderately reduce latent load, ambient sensible/total heat load ratio is less than usual. Thus, if dehumidification is carried out with a traditional cooling coil, over-sizing of the coil and re-heating of the treated air are necessary, with energy and economic waste. To offset these disadvantages, hybrid HVAC systems with chemical dehumidification may be employed. In this paper a case study is presented in which a traditional HVAC system is compared to hybrid systems with chemical dehumidification. Dynamic simulation codes (DOE and DesiCalc{sup (}TM)) and test reference year data (TRY), opportunely elaborated, have been used. Annual operating costs have been estimated and large savings have been obtained with hybrid systems. Considerable reduction of electric energy demand as well as better control of thermal-hygrometric conditions were noted. A simple payback of about 1 year has been obtained. Finally, a virtual retrofitting operation on 30% of the existing HVAC systems in Italian supermarkets has shown significant operating cost savings. [Author].

  9. D0 HVAC System Controls Evaluation of Upgrade Options

    Energy Technology Data Exchange (ETDEWEB)

    Markley, D.; Simon, P.; /Fermilab

    1998-05-05

    This engineering note documents three different options for upgrading the Dzero HVAC control system. All three options leave the current field hardware and field devices intact and upgrade the computer control hardware and software. Dzero will be heading into a physics run starting in 2000. This physics run could last several years. The Dzero HVAC system is an integral part of climate control and electronics cooling. The current HVAC control system is based upon a 1985 Johnson Controls System. In order to enter the next long-term physics run with a solid HVAC control system, the current control system needs to be upgraded. This proposal investigates three options: (1) Replacement to the next generation of Johnson Controls Hardware and Software with the Johnson Controls operator interface - FESS; (2) Replacement to the next generation of Johnson Controls Hardware and Software with the FIX32 Operator Interface - FESS/Dzero; and (3) Replacement with a commercially available Programmable Logic Controller (PLC) WITH THE FIX 32 Operator Interface - Dzero.

  10. System solution to improve energy efficiency of HVAC systems

    Science.gov (United States)

    Chretien, L.; Becerra, R.; Salts, N. P.; Groll, E. A.

    2017-08-01

    According to recent surveys, heating and air conditioning systems account for over 45% of the total energy usage in US households. Three main types of HVAC systems are available to homeowners: (1) fixed-speed systems, where the compressor cycles on and off to match the cooling load; (2) multi-speed (typically, two-speed) systems, where the compressor can operate at multiple cooling capacities, leading to reduced cycling; and (3) variable-speed systems, where the compressor speed is adjusted to match the cooling load of the household, thereby providing higher efficiency and comfort levels through better temperature and humidity control. While energy consumption could reduce significantly by adopting variable-speed compressor systems, the market penetration has been limited to less than 10% of the total HVAC units and a vast majority of systems installed in new construction remains single speed. A few reasons may explain this phenomenon such as the complexity of the electronic circuitry required to vary compressor speed as well as the associated system cost. This paper outlines a system solution to boost the Seasonal Energy Efficiency Rating (SEER) of a traditional single-speed unit through using a low power electronic converter that allows the compressor to operate at multiple low capacity settings and is disabled at high compressor speeds.

  11. Decentralized Optimization for a Novel Control Structure of HVAC System

    Directory of Open Access Journals (Sweden)

    Shiqiang Wang

    2016-01-01

    Full Text Available A decentralized control structure is introduced into the heating, ventilation, and air conditioning (HVAC system to solve the high maintenance and labor cost problem in actual engineering. Based on this new control system, a decentralized optimization method is presented for sensor fault repair and optimal group control of HVAC equipment. Convergence property of the novel method is theoretically analyzed considering both convex and nonconvex systems with constraints. In this decentralized control system, traditional device is fitted with a control chip such that it becomes a smart device. The smart device can communicate and operate collaboratively with the other devices to accomplish some designated tasks. The effectiveness of the presented method is verified by simulations and hardware tests.

  12. Control of noise - systems for compact HVAC units

    DEFF Research Database (Denmark)

    Pedersen, Steffen; Møller, Henrik

    2012-01-01

    This paper discusses noise control systems for implementation in compact HVAC units. The control of low-frequency noise presents different problems than at higher frequencies. This is mainly related to the long wavelength, which means that passive solutions require a significant volume of space......, often not available in compact HVAC units. Active control can provide attenuation over a significant frequency range, including low frequencies, while requiring a more limited space. While the concept of active noise control is simple, a number of limitations in the acoustical, electrical and control...... systems affect the performance of implementations. The source pressure and the impedance of a centrifugal fan were measured, and a number of configurations for noise control were investigated. The performance of a simple analogue feedback control was tested in a physical prototype. An adaptive digital...

  13. [Sick building syndrome and HVAC system: MVOC from air filters].

    Science.gov (United States)

    Schleibinger, H W; Wurm, D; Möritz, M; Böck, R; Rüden, H

    1997-08-01

    Growth and emissions of volatile metabolites of microorganisms on air filters are suspected to contribute to health complaints in ventilated rooms. To prove the microbiological production of volatile organic compounds (MVOC), concentrations of aldehydes and ketones were determined in two large HVAC systems. The in situ derivated aldehydes and ketones (as 2,4-dinitrophenyl-hydrazones) were analysed by HPLC and UV detection. The detection limit of each compound was 1 ppb (margin of error HVAC systems. First results show that the compounds formaldehyde, acetaldehyde and acetone could be detected before and after the filters. The concentrations of these VOC after the filters were significantly increased--as a mean over twenty measurements--, especially as far as filters made of glass fibre are concerned. However the found concentrations were low and mostly comparable to outdoor findings. In simultaneous laboratory experiments pieces of used filter material of one HVAC system and unused filter pieces (for blank values) were examined in small incubation chambers to investigate the possible production of MVOC. For the incubation a temperature of 20 degrees C and a relative humidity of 95% was chosen. In these experiments an almost identical spectrum of compounds (formaldehyde and acetone) was found as in the field measurements. The concentrations of these compounds were higher in the chambers with the used filter pieces. The concentration of acetone ranged up to almost 12 mg/m3.--As our field experiments correspond with our laboratory experiments, we assume that the microbial production of volatile organic compounds in HVAC systems under operating conditions is possible.

  14. Neural network based optimal control of HVAC&R systems

    Science.gov (United States)

    Ning, Min

    Heating, Ventilation, Air-Conditioning and Refrigeration (HVAC&R) systems have wide applications in providing a desired indoor environment for different types of buildings. It is well acknowledged that 30%-40% of the total energy generated is consumed by buildings and HVAC&R systems alone account for more than 50% of the building energy consumption. Low operational efficiency especially under partial load conditions and poor control are part of reasons for such high energy consumption. To improve energy efficiency, HVAC&R systems should be properly operated to maintain a comfortable and healthy indoor environment under dynamic ambient and indoor conditions with the least energy consumption. This research focuses on the optimal operation of HVAC&R systems. The optimization problem is formulated and solved to find the optimal set points for the chilled water supply temperature, discharge air temperature and AHU (air handling unit) fan static pressure such that the indoor environment is maintained with the least chiller and fan energy consumption. To achieve this objective, a dynamic system model is developed first to simulate the system behavior under different control schemes and operating conditions. The system model is modular in structure, which includes a water-cooled vapor compression chiller model and a two-zone VAV system model. A fuzzy-set based extended transformation approach is then applied to investigate the uncertainties of this model caused by uncertain parameters and the sensitivities of the control inputs with respect to the interested model outputs. A multi-layer feed forward neural network is constructed and trained in unsupervised mode to minimize the cost function which is comprised of overall energy cost and penalty cost when one or more constraints are violated. After training, the network is implemented as a supervisory controller to compute the optimal settings for the system. In order to implement the optimal set points predicted by the

  15. Design And Prototype Testing Of Economizer In HVAC Systems

    Directory of Open Access Journals (Sweden)

    Kongara Ajay

    2014-05-01

    Full Text Available Power, the word itself says to what extent the world is dependent on it. It may be fortunate or unfortunate, we are totally dependent on the power which is making the usage higher and higher which left us with energy crises and increasing costs of the energy usage. It’s time for Energy saving. These days, number of people in favour of the Energy saving has been increasing not to lessen the cost of usage but to let our future generations live with light and luxury. In this project, I have worked on the Energy conservation measures for HVAC that will save the energy to a little higher extent by designing an economizer. The theme of the project is to design a energy efficient economizer for HVAC Systems. A single unit of energy saving will yield in generation of two units of energy. My concern is to conserve energy and reduce usage by using ECMs where ever required.

  16. State-of-the-art sports facility's HVAC

    Energy Technology Data Exchange (ETDEWEB)

    Horton, M.K. (Gateway Sports Complex, Cleveland, OH (United States))

    1994-08-01

    This article describes the HVAC systems design to keep Cleveland's new Gateway sports and entertainment complex comfortable. This magnificent new facility embraces the 42,000-seat Jacobs Field, with its natural grass playing surface, and the 21,000-seat Arena at Gateway (the official name will be announced at its August 1 opening). The Arena is the new home of the Cleveland Cavaliers NBA basketball team and the Lumberjacks IHL ice hockey team. Other events that will be held here include arena football, circuses, ice shows, and concerts. It is anticipated that the Arena will be in use in excess of 200 days a year for these and other functions. The ballpark and the arena are separated by Gateway Plaza, a large illuminated public space that also will be the site of various entertainment events. An air conditioned pedestrian bridge, approximately 0.7 miles in length, connects the Arena with the Regional Transit Authority's downtown rapid transit station. Other enclosed walkways connect the Arena with two parking garages (3,158 vehicles total) and the larger garage with Jacobs Field.

  17. Filtration effectiveness of HVAC systems at near-roadway schools.

    Science.gov (United States)

    McCarthy, M C; Ludwig, J F; Brown, S G; Vaughn, D L; Roberts, P T

    2013-06-01

    Concern for the exposure of children attending schools located near busy roadways to toxic, traffic-related air pollutants has raised questions regarding the environmental benefits of advanced heating, ventilation, and air-conditioning (HVAC) filtration systems for near-road pollution. Levels of black carbon and gaseous pollutants were measured at three indoor classroom sites and at seven outdoor monitoring sites at Las Vegas schools. Initial HVAC filtration systems effected a 31-66% reduction in black carbon particle concentrations inside three schools compared with ambient air concentrations. After improved filtration systems were installed, black carbon particle concentrations were reduced by 74-97% inside three classrooms relative to ambient air concentrations. Average black carbon particle concentrations inside the schools with improved filtration systems were lower than typical ambient Las Vegas concentrations by 49-96%. Gaseous pollutants were higher indoors than outdoors. The higher indoor concentrations most likely originated at least partially from indoor sources, which were not targeted as part of this intervention. Recent literature has demonstrated adverse health effects in subjects exposed to ambient air near major roadways. Current smart growth planning and infill development often require that buildings such as schools are built near major roadways. Improving the filtration systems of a school's HVAC system was shown to decrease children's exposure to near-roadway diesel particulate matter. However, reducing exposure to the gas-phase air toxics, which primarily originated from indoor sources, may require multiple filter passes on recirculated air. © 2012 John Wiley & Sons A/S. Published by Blackwell Publishing Ltd.

  18. Intelligent control of HVAC systems. Part II: perceptron performance analysis

    Directory of Open Access Journals (Sweden)

    Ioan URSU

    2013-09-01

    Full Text Available This is the second part of a paper on intelligent type control of Heating, Ventilating, and Air-Conditioning (HVAC systems. The whole study proposes a unified approach in the design of intelligent control for such systems, to ensure high energy efficiency and air quality improving. In the first part of the study it is considered as benchmark system a single thermal space HVAC system, for which it is assigned a mathematical model of the controlled system and a mathematical model(algorithm of intelligent control synthesis. The conception of the intelligent control is of switching type, between a simple neural network, a perceptron, which aims to decrease (optimize a cost index,and a fuzzy logic component, having supervisory antisaturating role for neuro-control. Based on numerical simulations, this Part II focuses on the analysis of system operation in the presence only ofthe neural control component. Working of the entire neuro-fuzzy system will be reported in a third part of the study.

  19. HVAC System Automatic Controls and Indoor Air Quality in Schools. Technical Bulletin.

    Science.gov (United States)

    Wheeler, Arthur E.

    Fans, motors, coils, and other control components enable a heating, ventilating, and air-conditioning (HVAC) system to function smoothly. An explanation of these control components and how they make school HVAC systems work is provided. Different systems may be compared by counting the number of controlled devices that are required. Control…

  20. HVAC System Automatic Controls and Indoor Air Quality in Schools. Technical Bulletin.

    Science.gov (United States)

    Wheeler, Arthur E.

    Fans, motors, coils, and other control components enable a heating, ventilating, and air-conditioning (HVAC) system to function smoothly. An explanation of these control components and how they make school HVAC systems work is provided. Different systems may be compared by counting the number of controlled devices that are required. Control…

  1. New Comparison of HVDC and HVAC Transmission system

    Directory of Open Access Journals (Sweden)

    Vahid Behravesh

    2012-06-01

    Full Text Available Alternating current (AC is the main driving force in the industries and residential areas, but for the long transmission line (more than 400 miles AC transmission is more expensive than that of direct current (DC. Technically, AC transmission line control is more complicated because of the frequency. DC transmission does not have these limitations, which has led to build long HVDC transmission lines over the last 40 years. HVDC technology made possible to transfer bulk power over long distances. This paper presents a comparative evaluation of HVDC and HVAC transmission systems .

  2. New HVAC control by system identification

    Energy Technology Data Exchange (ETDEWEB)

    So, A.T.P.; Chan, W.L.; Chow, T.T.; Tse, W.L. [City University of Hong Kong, Kowloon (Hong Kong)

    1995-12-01

    Modern air-conditioning systems for commercial buildings commonly employ the concept of a ``Central All-Air System`` and the VAV system in particular is widely used in Hong Kong, and other places around the world for energy conservation. In the lengthy wet summer season of Hong Kong centralised air-handling units (AHUs) dehumidify and cool down the appropriate mixture of return air and outdoor fresh air to feed a ducting network to various Variable Air Volume Boxes. A good controller for the AHUs is extremely desirable from both human comfort and energy saving points of view. In this paper, a simulation model for a practical air-handling system is presented. Its behaviour under a conventional system of PID controllers is studied. A new controller based on system identification is developed where input and actuating variables are incorporated into a system identification model which can predict the new system status based on past records and suggest the optimal control actions. Computer simulation has proved that such a system identification based controller is superior to the conventional PID controller from at least the following three aspects: adaptation to system change, response rate and energy conservation. (author)

  3. Protecting HVAC systems from bio-terrorism.

    Science.gov (United States)

    Arterburn, Tom

    2003-01-01

    The FBI, in the wake of the September 11 attacks, issued an advisory to state and local law enforcement authorities and the public asking to remain especially alert to any unusual activities around ventilation systems. It noted that while the Bureau possessed no specific threats regarding the release of toxic chemicals into air handling systems, building owners and managers should be well-aware of the potential for contamination of such systems. This article presents recommendations of air-handling experts and associations for operators to consider.

  4. Flexible HVAC System for Lab or Classroom.

    Science.gov (United States)

    Friedan, Jonathan

    2001-01-01

    Discusses an effort to design a heating, ventilation, and air conditioning system flexible enough to accommodate an easy conversion of classrooms to laboratories and dry labs to wet labs. The design's energy efficiency and operations and maintenance are examined. (GR)

  5. Flexible HVAC System for Lab or Classroom.

    Science.gov (United States)

    Friedan, Jonathan

    2001-01-01

    Discusses an effort to design a heating, ventilation, and air conditioning system flexible enough to accommodate an easy conversion of classrooms to laboratories and dry labs to wet labs. The design's energy efficiency and operations and maintenance are examined. (GR)

  6. Thermal Components Boost Performance of HVAC Systems

    Science.gov (United States)

    2012-01-01

    As the International Space Station (ISS) travels 17,500 miles per hour, normal is having a constant sensation of free-falling. Normal is no rain, but an extreme amount of shine.with temperatures reaching 250 F when facing the Sun. Thanks to a number of advanced control systems onboard the ISS, however, the interior of the station remains a cool, comfortable, normal environment where astronauts can live and work for extended periods of time. There are two main control systems on the ISS that make it possible for humans to survive in space: the Thermal Control System (TCS) and the Environmental Control and Life Support system. These intricate assemblies work together to supply water and oxygen, regulate temperature and pressure, maintain air quality, and manage waste. Through artificial means, these systems create a habitable environment for the space station s crew. The TCS constantly works to regulate the temperature not only for astronauts, but for the critical instruments and machines inside the spacecraft as well. To do its job, the TCS encompasses several components and systems both inside and outside of the ISS. Inside the spacecraft, a liquid heat-exchange process mechanically pumps fluids in closed-loop circuits to collect, transport, and reject heat. Outside the ISS, an external system circulates anhydrous ammonia to transport heat and cool equipment, and radiators release the heat into space. Over the years, NASA has worked with a variety of partners.public and private, national and international. to develop and refine the most complex thermal control systems ever built for spacecraft, including the one on the ISS.

  7. Wireless Demand Response Controls for HVAC Systems

    Energy Technology Data Exchange (ETDEWEB)

    Federspiel, Clifford

    2009-06-30

    The objectives of this scoping study were to develop and test control software and wireless hardware that could enable closed-loop, zone-temperature-based demand response in buildings that have either pneumatic controls or legacy digital controls that cannot be used as part of a demand response automation system. We designed a SOAP client that is compatible with the Demand Response Automation Server (DRAS) being used by the IOUs in California for their CPP program, design the DR control software, investigated the use of cellular routers for connecting to the DRAS, and tested the wireless DR system with an emulator running a calibrated model of a working building. The results show that the wireless DR system can shed approximately 1.5 Watts per design CFM on the design day in a hot, inland climate in California while keeping temperatures within the limits of ASHRAE Standard 55: Thermal Environmental Conditions for Human Occupancy.

  8. Considerations to Prevent Growth and Spread of Legionella in HVAC Systems.

    Science.gov (United States)

    Coleman, Jeff

    1998-01-01

    Discusses the threat posed by the Legionnaire's Disease bacterium and the germ's ability to thrive in heating, ventilating, and air conditioning (HVAC) systems, especially in standing water. Describes ways to minimize disease risk through HVAC system design (such as locating cooling towers away from air intakes) and ways to maintain a clean…

  9. Air Cleaning Devices for HVAC Supply Systems in Schools. Technical Bulletin.

    Science.gov (United States)

    Wheeler, Arthur E.

    Guidelines for maintaining indoor air quality in schools with HVAC air cleaning systems are provided in this document. Information is offered on the importance of air cleaning, sources of air contaminants and indoor pollutants, types of air cleaners and particulate filters used in central HVAC systems, vapor and gas removal, and performance…

  10. Considerations to Prevent Growth and Spread of Legionella in HVAC Systems.

    Science.gov (United States)

    Coleman, Jeff

    1998-01-01

    Discusses the threat posed by the Legionnaire's Disease bacterium and the germ's ability to thrive in heating, ventilating, and air conditioning (HVAC) systems, especially in standing water. Describes ways to minimize disease risk through HVAC system design (such as locating cooling towers away from air intakes) and ways to maintain a clean…

  11. Theoretical analysis of HVAC duct hanger systems

    Science.gov (United States)

    Miller, R. D.

    1987-01-01

    Several methods are presented which, together, may be used in the analysis of duct hanger systems over a wide range of frequencies. The finite element method (FEM) and component mode synthesis (CMS) method are used for low- to mid-frequency range computations and have been shown to yield reasonably close results. The statistical energy analysis (SEA) method yields predictions which agree with the CMS results for the 800 to 1000 Hz range provided that a sufficient number of modes participate. The CMS approach has been shown to yield valuable insight into the mid-frequency range of the analysis. It has been demonstrated that it is possible to conduct an analysis of a duct/hanger system in a cost-effective way for a wide frequency range, using several methods which overlap for several frequency bands.

  12. Modeling and Measurement Constraints in Fault Diagnostics for HVAC Systems

    Energy Technology Data Exchange (ETDEWEB)

    Najafi, Massieh; Auslander, David M.; Bartlett, Peter L.; Haves, Philip; Sohn, Michael D.

    2010-05-30

    Many studies have shown that energy savings of five to fifteen percent are achievable in commercial buildings by detecting and correcting building faults, and optimizing building control systems. However, in spite of good progress in developing tools for determining HVAC diagnostics, methods to detect faults in HVAC systems are still generally undeveloped. Most approaches use numerical filtering or parameter estimation methods to compare data from energy meters and building sensors to predictions from mathematical or statistical models. They are effective when models are relatively accurate and data contain few errors. In this paper, we address the case where models are imperfect and data are variable, uncertain, and can contain error. We apply a Bayesian updating approach that is systematic in managing and accounting for most forms of model and data errors. The proposed method uses both knowledge of first principle modeling and empirical results to analyze the system performance within the boundaries defined by practical constraints. We demonstrate the approach by detecting faults in commercial building air handling units. We find that the limitations that exist in air handling unit diagnostics due to practical constraints can generally be effectively addressed through the proposed approach.

  13. Case study field evaluation of a systems approach to retrofitting a residential HVAC system

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Iain S.; McWiliams, Jennifer A.; Konopacki, Steven J.

    2003-09-01

    This case study focusing on a residence in northern California was undertaken as a demonstration of the potential of a systems approach to HVAC retrofits. The systems approach means that other retrofits that can affect the HVAC system are also considered. For example, added building envelope insulation reduces building loads so that smaller capacity HVAC system can be used. Secondly, we wanted to examine the practical issues and interactions with contractors and code officials required to accomplish the systems approach because it represents a departure from current practice. We identified problems in the processes of communication and installation of the retrofit that led to compromises in the final energy efficiency of the HVAC system. These issues must be overcome in order for HVAC retrofits to deliver the increased performance that they promise. The experience gained in this case study was used to optimize best practices guidelines for contractors (Walker 2003) that include building diagnostics and checklists as tools to assist in ensuring the energy efficiency of ''house as a system'' HVAC retrofits. The best practices guidelines proved to be an excellent tool for evaluating the eight existing homes in this study, and we received positive feedback from many potential users who reviewed and used them. In addition, we were able to substantially improve the energy efficiency of the retrofitted case study house by adding envelope insulation, a more efficient furnace and air conditioner, an economizer and by reducing duct leakage.

  14. Case study field evaluation of a systems approach to retrofitting a residential HVAC system

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Iain S.; McWiliams, Jennifer A.; Konopacki, Steven J.

    2003-09-01

    This case study focusing on a residence in northern California was undertaken as a demonstration of the potential of a systems approach to HVAC retrofits. The systems approach means that other retrofits that can affect the HVAC system are also considered. For example, added building envelope insulation reduces building loads so that smaller capacity HVAC system can be used. Secondly, we wanted to examine the practical issues and interactions with contractors and code officials required to accomplish the systems approach because it represents a departure from current practice. We identified problems in the processes of communication and installation of the retrofit that led to compromises in the final energy efficiency of the HVAC system. These issues must be overcome in order for HVAC retrofits to deliver the increased performance that they promise. The experience gained in this case study was used to optimize best practices guidelines for contractors (Walker 2003) that include building diagnostics and checklists as tools to assist in ensuring the energy efficiency of ''house as a system'' HVAC retrofits. The best practices guidelines proved to be an excellent tool for evaluating the eight existing homes in this study, and we received positive feedback from many potential users who reviewed and used them. In addition, we were able to substantially improve the energy efficiency of the retrofitted case study house by adding envelope insulation, a more efficient furnace and air conditioner, an economizer and by reducing duct leakage.

  15. Airside HVAC BESTEST: HVAC Air-Distribution System Model Test Cases for ASHRAE Standard 140

    Energy Technology Data Exchange (ETDEWEB)

    Judkoff, Ronald [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Neymark, Joel [J. Neymark & Associates; Kennedy, Mike D. [Mike D. Kennedy, Inc.; Gall, J. [AAON, Inc.; Henninger, R. [GARD Analytics, Inc.; Hong, T. [Lawrence Berkeley National Laboratory; Knebel, D. [AAON, Inc.; McDowell, T. [Thermal Energy System Specialists, LLC; Witte, M. [GARD Analytics, Inc.

    2017-08-07

    This paper summarizes recent work to develop new airside HVAC equipment model analytical verification test cases for ANSI/ASHRAE Standard 140, Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs. The analytical verification test method allows comparison of simulation results from a wide variety of building energy simulation programs with quasi-analytical solutions, further described below. Standard 140 is widely cited for evaluating software for use with performance-path energy efficiency analysis, in conjunction with well-known energy-efficiency standards including ASHRAE Standard 90.1, the International Energy Conservation Code, and other international standards. Airside HVAC Equipment is a common area of modelling not previously explicitly tested by Standard 140. Integration of the completed test suite into Standard 140 is in progress.

  16. T.A.B. of HVAC System in IMEF

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Sang Youl; Choo, Y. S.; Choung, W. M.; You, K. S.; Hong, K. P

    2005-12-15

    T.A.B of the HVAC system in IMEF is that the adjustment for satisfying the design requirement is done through the review of documents related to the its design and the measurement using the apparatus. Doing T.A.B., the comfortable indoor environments and the negative pressure among the areas is remained, and the air flows to the more contaminated area. T.A.B. is an abbreviation of Testing, Adjusting and Balancing. In this job, a quantitative judgment of each equipments' performance, a proper adjustment of the volume of airflow and water in terminal equipment and a proportional distribution of flow rate in the distribution system(main duct, branch duct and terminal) based on design values have been performed. After finishing these procedures, the system is inspected and adjusted so that all air conditioning system in IMEF building performs its best capacity as mentioned in design requirements.

  17. Co-simulation of innovative integrated HVAC systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Trcka, Marija; Hensena, Jan L.M.; Wetter, Michael

    2010-06-21

    Integrated performance simulation of buildings HVAC systems can help in reducing energy consumption and increasing occupant comfort. However, no single building performance simulation (BPS) tool offers sufficient capabilities and flexibilities to analyze integrated building systems and to enable rapid prototyping of innovative building and system technologies. One way to alleviate this problem is to use co-simulation, as an integrated approach to simulation. This article elaborates on issues important for co-simulation realization and discusses multiple possibilities to justify the particular approach implemented in the here described co-simulation prototype. The prototype is validated with the results obtained from the traditional simulation approach. It is further used in a proof-of-concept case study to demonstrate the applicability of the method and to highlight its benefits. Stability and accuracy of different coupling strategies are analyzed to give a guideline for the required coupling time step.

  18. Space HVAC systems - a manual. Vol. 3. Constructional elements. Handbuch der Klimatechnik. Bd. 3. Bauelemente

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    Vol. 3 of this series describes the design, function and fundamentals of calculation of air conditioning system elements and gives hints on their fields of application. Subjects: Heat transfer media; air moisturizers and dehumidifiers and their application in HVAC systems; refrigerators; air filters; ducts and auxiliary elements; fans; air conditioners; measuring methods and equipment for HVAC systems; fire protection and mechanical smoke prevention; clean room technology. (HWJ).

  19. Determination of k-factors of HVAC system components using measurement and CFD modelling

    OpenAIRE

    Smith, Shaun J.

    1998-01-01

    This thesis conforms conventional and advanced experimental techniques for the measurement of and mathematical prediction of velocity pressure-loss factors (kfactors) for fittings used in heating, ventilation and air-conditioning (HVAC) systems. After an extensive study of different tracer-gas experimental techniques, the constant injection method is applied to various duct fittings on a small scale HVAC system situated in a laboratory. The results are compared with those of experiments perfo...

  20. Small Business Voucher CRADA Report: Natural Gas Powered HVAC System for Commercial and Residential Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Betts, Daniel [Be Power Tech, Deerfield Beach, FL (United States); Ally, Moonis Raza [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Mudiraj, Shyam [Be Power Tech, Deerfield Beach, FL (United States); Tilghman, Matthew [Be Power Tech, Deerfield Beach, FL (United States); Graham, Matthew [Be Power Tech, Deerfield Beach, FL (United States)

    2017-04-30

    Be Power Tech is commercializing BeCool, the first integrated electricity-producing heating, ventilation, and air conditioning (HVAC) system using a non-vapor compression cycle (VCC), packaged rooftop HVAC unit that also produces base-load electricity, heating, ventilation, and air conditioning. BeCool is a distributed energy resource with energy storage that eliminates the tremendous peak electricity demand associated with commonly used electricity-powered vapor compression air conditioning systems.

  1. Comparative Analysis of HVAC System Based on Life Cycle Cost Analysis

    Directory of Open Access Journals (Sweden)

    Jignesh M. Barot

    2014-07-01

    Full Text Available A heating, ventilating, and air conditioning (HVAC system is designed to satisfy the environmental requirements of comfort or a process, in a specific building or portion of a building and in a particular geographic locale. Efficient design of heating, ventilating and air-conditioning (HVAC systems is a primary concern in building projects. The objectives of the HVAC system design are to provide a thermal comfort, good indoor quality and energy conservation. For the typical commercial building projects, it is not difficult to acquire the reference settings for efficient operation. However, for some special projects, due to the specific design and control of the HVAC system, conventional settings may not be necessarily energy-efficient in daily operation. The HVAC system design and equipment selection for a commercial building (376 TR is included as a case study in this paper. The outcomes of this paper are efficient design of HVAC system with minimum energy consumption and equipment selection based on operating and life cycle cost analysis.

  2. Comparative Energy and Cost Analysis Between Conventional HVAC Systems and Geothermal Heat Pump Systems

    Science.gov (United States)

    2007-11-02

    heat pump (GSHP) relative to conventional heating ventilation and air conditioning (HVAC) systems: air-source heat pumps (ASHP), air-cooled air conditioning with either natural gas, fuel oil, or liquid petroleum gas furnaces, or with electrical resistance heating. The Monte Carlo simulation is performed for a standard commercial office building within each of the 48 continental states. Regardless of the conventional HVAC system chosen, the simulation shows that for each state the GSHP has the highest probability of using less energy and having a lower operating and life

  3. Design and Implementation of Energy Efficiency in HVAC Systems Based on Robust PID Control for Industrial Applications

    OpenAIRE

    Muharrem Imal

    2015-01-01

    Energy efficiency in heating, ventilating, and air-conditioning (HVAC) systems is a primary concern in process projects, since the energy consumption has the highest percentage in HVAC for all processes. Without sacrifice of thermal comfort, to reset the suitable operating parameters, such as the humidity and air temperature, would have energy saving with immediate effect. In this paper, the simulation-optimization approach described the effective energy efficiency for HVAC systems which are ...

  4. Review on the HVAC System Modeling Types and the Shortcomings of Their Application

    Directory of Open Access Journals (Sweden)

    Raad Z. Homod

    2013-01-01

    Full Text Available The modeling of the heating, ventilation, and air conditioning (HVAC system is a prominent topic because of its relationship with energy savings and environmental, economical, and technological issues. The modeling of the HVAC system is concerned with the indoor thermal sensation, which is related to the modeling of building, air handling unit (AHU equipments, and indoor thermal processes. Until now, many HVAC system modeling approaches are made available, and the techniques have become quite mature. But there are some shortcomings in application and integration methods for the different types of the HVAC model. The application and integration processes will act to accumulate the defective characteristics for both AHU equipments and building models such as nonlinear, pure lag time, high thermal inertia, uncertain disturbance factors, large-scale systems, and constraints. This paper shows types of the HVAC model and the advantages and disadvantages for each application of them, and it finds out that the gray-box type is the best one to represent the indoor thermal comfort. But its application fails at the integration method where its response deviated to unreal behavior.

  5. HVAC cable systems with forced water cooling for wind energy transmission

    Energy Technology Data Exchange (ETDEWEB)

    Brakelmann, Heinrich; Zhang, Dongping [Duisburg-Essen Univ., Duisburg (DE). Dept. Energy Transport and Storage (ETS)

    2008-07-01

    This paper presents a solution for an efficient wind energy transmission onshore: HVAC cable system with forced water cooling, which provides a substantial increase of the cable ampacity without any modification of the cable construction and design. This work shows the projecting and planning of such HVAC cable systems in combination with a cooling system, especially considering the faulty (n-1)-case. The efficiency utilizing the short-term load capacity of the cable systems transmitting wind energy is shown by computations provided by specialized and adapted FEM (Finite Element Method) software. (orig.)

  6. Plutonium Finishing Plant (PFP) HVAC System Component Index

    Energy Technology Data Exchange (ETDEWEB)

    DIAZ, E.N.; DICK, J.D.

    2000-07-26

    This document lists safety class (SC) and safety significant (SS) components for the Heating Ventilation Air Conditioning (HVAC) and specifies the critical characteristics for Commercial Grade Items (CGI), as required by HNF-PRO-268 and HNF-PRO-1819. These are the minimum specifications that the equipment must meet in order to properly perform its safety function. There may be several manufacturers or models that meet the critical characteristics for any one item.

  7. Integrated high efficiency blower apparatus for HVAC systems

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xiaoyue; Weigman, Herman; Wang, Shixiao

    2007-07-24

    An integrated centrifugal blower wheel for a heating, ventilation and air conditioning (HVAC) blower unit includes a first blade support, a second blade support, and a plurality of S-shaped blades disposed between the first and second blade supports, wherein each of the S-shaped blades has a trailing edge bent in a forward direction with respect to a defined direction of rotation of the wheel.

  8. Integrated high efficiency blower apparatus for HVAC systems

    Science.gov (United States)

    Liu, Xiaoyue; Weigman, Herman; Wang, Shixiao

    2007-07-24

    An integrated centrifugal blower wheel for a heating, ventilation and air conditioning (HVAC) blower unit includes a first blade support, a second blade support, and a plurality of S-shaped blades disposed between the first and second blade supports, wherein each of the S-shaped blades has a trailing edge bent in a forward direction with respect to a defined direction of rotation of the wheel.

  9. RADON MITIGATION IN SCHOOLS: HVAC SYTEMS IN SCHOOLS TEND TO HAVE A GREATER IMPACT ON RADON LEVELS THAN HVAC SYSTEMS IN HOMES

    Science.gov (United States)

    The first part of this two-part paper discusses radon entry into schools, radon mitigation approaches for schools, and school characteristics (e.g., heating, ventilation, and air conditioing -- HVAC-- system design and operationg) that influence radon entry and mitigation system ...

  10. RADON MITIGATION IN SCHOOLS: HVAC SYTEMS IN SCHOOLS TEND TO HAVE A GREATER IMPACT ON RADON LEVELS THAN HVAC SYSTEMS IN HOMES

    Science.gov (United States)

    The first part of this two-part paper discusses radon entry into schools, radon mitigation approaches for schools, and school characteristics (e.g., heating, ventilation, and air conditioing -- HVAC-- system design and operationg) that influence radon entry and mitigation system ...

  11. Predictive functional control based on fuzzy T-S model for HVAC systems temperature control

    Institute of Scientific and Technical Information of China (English)

    Hongli L(U); Lei JIA; Shulan KONG; Zhaosheng ZHANG

    2007-01-01

    In heating,ventilating and air-conditioning(HVAC)systems,there exist severe nonlinearity,time-varying nature,disturbances and uncertainties.A new predictive functional control based on Takagi-Sugeno(T-S)fuzzy model was proposed to control HVAC systems.The T-S fuzzy model of stabilized controlled process was obtained using the least squares method,then on the basis of global linear predictive model from T-S fuzzy model,the process was controlled by the predictive functional controller.Especially the feedback regulation part was developed to compensate uncertainties of fuzzy predictive model.Finally simulation test results in HVAC systems control applications showed that the proposed fuzzy model predictive functional control improves tracking effect and robustness.Compared with the conventional PID controller,this control strategy has the advantages of less overshoot and shorter setting time,etc.

  12. Fungal colonization of air filters for use in heating, ventilating, and air conditioning (HVAC) systems.

    Science.gov (United States)

    Simmons, R B; Crow, S A

    1995-01-01

    New and used cellulosic air filters for HVAC systems including those treated with antimicrobials were suspended in vessels with a range of relative humidities (55-99%) and containing non-sterile potting soil which stimulates fungal growth. Most filters yielded fungi prior to suspension in the chambers but only two of 14 nontreated filters demonstrated fungal colonization following use in HVAC systems. Filters treated with antimicrobials, particularly a phosphated amine complex, demonstrated markedly less fungal colonization than nontreated filters. In comparison with nontreated cellulosic filters, fungal colonization of antimicrobial-treated cellulosic filters was selective and delayed.

  13. Power Flow Analysis of HVAC and HVDC Transmission Systems for Offshore WindParks

    DEFF Research Database (Denmark)

    da Silva, Filipe Miguel Faria; Castro, Rui

    2009-01-01

    As the onshore wind resource is running shorter, wind power promoters are paying attention to the offshore resources. As in most cases there is no load offshore, wind power must be transmitted to the main land. To do so, two options are available: HVAC and HVDC transmission systems. In this paper...... that HVAC solution is limited by the distance to shore and by the wind transmitted power. HVDC options do not show these limitations, but are more expensive and more delicate to deal with, because there is a lack of operational experience, so far....

  14. 'Consolidation' of HVAC and cooling systems at CERN

    CERN Document Server

    Inigo-Golfin, J; Pepinster, P; CERN. Geneva. TS Department

    2008-01-01

    A â€ワconsolidation” of installations after they have reached the end of their predetermined life-time is part of the life cycle of industrial installations, regardless how well maintained they are. The â€ワconsolidation” plan might cover the replacement of obsolete equipment, partial refurbishment, the work requested to comply with new standards and applicable rules (environmental aspects) until the complete replacement of the whole installation. This â€ワconsolidation” process is all the more critical since the installation dates of the existing cooling and HVAC equipment at CERN spans over a period of 50 years and â€ワconsolidation” in the past has been not been systematic, being most of the time associated with new projects. This paper describes the reasons behind the recent â€ワconsolidation” requests for cooling and HVAC equipment both for the accelerators backbone and in tertiary buildings. A criticality analysis is given, based on the criteria laid down in the p...

  15. AIRLESS, a European project on HVAC systems: Project programme and current status

    NARCIS (Netherlands)

    Bluyssen, P.M.; Björkroth, M.; Müller, B.; Oliveira Fernandes, E. de; Clausen, G.H.; Molina, J.L.; Roulet, C.A.

    1999-01-01

    In the beginning of 1998 a three year European project, AIRLESS, was started to develop strategies, principles and protocols to improve and control the performance of HVAC-systems and its components for incorporation in codes and guidelines. Twelve institutes, universities and companies from seven E

  16. Application of black-box models to HVAC systems for fault detection

    NARCIS (Netherlands)

    Peitsman, H.C.; Bakker, V.E.

    1996-01-01

    This paper describes the application of black-box models for fault detection and diagnosis (FDD) in heating, ventilat-ing, and air-conditioning (HVAC) systems. In this study, mul-tiple-input/single-output (MISO) ARX models and artificial neural network (ANN) models are used. The ARX models are exami

  17. Assessment of microbiological indoor air quality in an Italian office building equipped with an HVAC system.

    Science.gov (United States)

    Bonetta, Sa; Bonetta, Si; Mosso, S; Sampò, S; Carraro, E

    2010-02-01

    The purpose of this study was to evaluate the level and composition of bacteria and fungi in the indoor air of an Italian office building equipped with a heating, ventilation and air conditioning (HVAC) system. Airborne bacteria and fungi were collected in three open-space offices during different seasons. The microbial levels in the outdoor air, supply air diffusers, fan coil air flow and air treatment unit humidification water tank were used to evaluate the influence of the HVAC system on indoor air quality (IAQ). A medium-low level of bacterial contamination (50-500 CFU/m(3)) was found in indoor air. Staphylococcus and Micrococcus were the most commonly found genera, probably due to human presence. A high fungal concentration was measured due to a flood that occurred during the winter. The indoor seasonal distribution of fungal genera was related to the fungal outdoor distribution. Significant seasonal and daily variation in airborne microorganisms was found, underlining a relationship with the frequency of HVAC system switching on/off. The results of this monitoring highlight the role of the HVAC system on IAQ and could be useful to better characterise bacterial and fungal population in the indoor air of office buildings.

  18. Application of black-box models to HVAC systems for fault detection

    NARCIS (Netherlands)

    Peitsman, H.C.; Bakker, V.E.

    1996-01-01

    This paper describes the application of black-box models for fault detection and diagnosis (FDD) in heating, ventilat-ing, and air-conditioning (HVAC) systems. In this study, mul-tiple-input/single-output (MISO) ARX models and artificial neural network (ANN) models are used. The ARX models are

  19. Towards a framework for selection of supervisory control for commercial buildings: HVAC system energy efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Ramachandran, Thiagarajan; Kundu, Soumya; Chen, Yan; Vrabie, Draguna L.

    2017-07-03

    This paper develops and utilizes an optimization based framework to investigate the maximal energy efficiency potentially attainable by HVAC system operation in a non-predictive context. Performance is evaluated relative to the existing state of the art set-point reset strategies. The expected efficiency increase driven by operation constraints relaxations is evaluated.

  20. AIRLESS, a European project on HVAC systems: Project programme and current status

    NARCIS (Netherlands)

    Bluyssen, P.M.; Björkroth, M.; Müller, B.; Oliveira Fernandes, E. de; Clausen, G.H.; Molina, J.L.; Roulet, C.A.

    1999-01-01

    In the beginning of 1998 a three year European project, AIRLESS, was started to develop strategies, principles and protocols to improve and control the performance of HVAC-systems and its components for incorporation in codes and guidelines. Twelve institutes, universities and companies from seven

  1. Energy-Smart Choices for Schools. An HVAC Comparison Tool. [CD-ROM].

    Science.gov (United States)

    Geothermal Heat Pump Consortium, Inc., Washington, DC.

    A CD ROM program provides comparison construction cost capabilities for heating, ventilation, and air conditioning (HVAC) systems in educational facilities. The program combines multiple types of systems with square footage data on low and high construction cost and school size to automatically calculate HVAC comparative construction costs. (GR)

  2. Energy-Smart Choices for Schools. An HVAC Comparison Tool. [CD-ROM].

    Science.gov (United States)

    Geothermal Heat Pump Consortium, Inc., Washington, DC.

    A CD ROM program provides comparison construction cost capabilities for heating, ventilation, and air conditioning (HVAC) systems in educational facilities. The program combines multiple types of systems with square footage data on low and high construction cost and school size to automatically calculate HVAC comparative construction costs. (GR)

  3. Analysis on energy saving potential of integrated supermarket HVAC and refrigeration systems using multiple subcoolers

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Liang [Institute of Refrigeration and Cryogenics, Shanghai Jiaotong University, Shanghai 200240 (China); China R and D Center, Carrier Corporation, No. 3239 Shen Jiang Road, Shanghai 201206 (China); Zhang, Chun-Lu [China R and D Center, Carrier Corporation, No. 3239 Shen Jiang Road, Shanghai 201206 (China)

    2010-02-15

    The paper presents a model-based analysis on the energy saving potential of supermarket HVAC (heating, ventilating, and air-conditioning) and refrigeration systems using multiple subcoolers among the high-temperature HVAC system, the medium-temperature refrigeration system, and the low-temperature refrigeration system. The principle of energy reduction is to have the higher COP (coefficient of performance) system generate more cooling capacity to increase the cooling capacity or reduce the power consumption of the lower COP system. The subcooler could be placed between the medium-temperature and low-temperature systems, between the high-temperature and medium-temperature systems, and between the high-temperature and low-temperature systems. All integration scenarios of adding one, two and three subcoolers have been investigated. The energy saving potential varies with the load ratio between high-, medium- and low-temperature systems, COP of three systems, and the ''on-off'' duty time of HVAC system. The optimal sequence of adding subcoolers is also proposed. (author)

  4. Portable refrigerant charge meter and method for determining the actual refrigerant charge in HVAC systems

    Energy Technology Data Exchange (ETDEWEB)

    Gao, Zhiming; Abdelaziz, Omar; LaClair, Tim L.

    2017-08-08

    A refrigerant charge meter and a method for determining the actual refrigerant charge in HVAC systems are described. The meter includes means for determining an optimum refrigerant charge from system subcooling and system component parameters. The meter also includes means for determining the ratio of the actual refrigerant charge to the optimum refrigerant charge. Finally, the meter includes means for determining the actual refrigerant charge from the optimum refrigerant charge and the ratio of the actual refrigerant charge to the optimum refrigerant charge.

  5. Control of Variable-Speed Pressurization Fan for an Offshore HVAC System

    DEFF Research Database (Denmark)

    Yang, Zhenyu; Pedersen, Simon; Løhndorf, Petar Durdevic

    2014-01-01

    of the inlet channel in the considered Heating Ventilation and Air-Condition (HVAC) system, or the pressurization system located inside the inlet channel, or both of them in a coordinated way. A Model-Predictive Control (MPC) solution to control the inlet throttle has been proposed in our previous work....... This paper proposes a set of control solutions to regulate the variablespeed pressurization fan system such that the energy efficiency of the considered HVAC system can be explicitly considered. A combined feed-forward with a PI-based feedback control solution, and a MPC solution are proposed based...... on derived simple system models. Some preliminary simulation results exhibit that both control solutions can keep the indoor pressure and the air circulation in a very satisfactory and robust manner, even subject to the presence of severe disturbances....

  6. Comparative guide to emerging diagnostic tools for large commercial HVAC systems

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, Hannah; Piette, Mary Ann

    2001-05-01

    This guide compares emerging diagnostic software tools that aid detection and diagnosis of operational problems for large HVAC systems. We have evaluated six tools for use with energy management control system (EMCS) or other monitoring data. The diagnostic tools summarize relevant performance metrics, display plots for manual analysis, and perform automated diagnostic procedures. Our comparative analysis presents nine summary tables with supporting explanatory text and includes sample diagnostic screens for each tool.

  7. Saving electricity in HVAC systems. Elektrizitaet sparen in Heizungs-, Lueftungs-, Klima- und Kaelteanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Hochstrasser, W.

    1993-03-01

    The SIA initiated the recommendation SIA 380/4, ''Electrical energy in building construction'' which contains information on energy conservation. As an example, the field of HVAC systems is discussed. In this field, electrical energy is required especially for the following applications: Blower drives, refrigerating compressor drives, hot and cold water pumps, oil and gas burners, control systems, air heaters, and electric moisturizers. Energy-saving alternatives are presented in each case. (orig.)

  8. Power Flow Analysis of HVAC and HVDC Transmission Systems for Offshore WindParks

    DEFF Research Database (Denmark)

    da Silva, Filipe Miguel Faria; Castro, Rui

    2009-01-01

    , the two options are analysed from a power flow point of view. The influence in the voltage regulation of the onshore connection busbar is investigated in a 57 bus test power system. The simulation results obtained for each one of the above mentioned transmission system configurations allow the conclusion......As the onshore wind resource is running shorter, wind power promoters are paying attention to the offshore resources. As in most cases there is no load offshore, wind power must be transmitted to the main land. To do so, two options are available: HVAC and HVDC transmission systems. In this paper...... that HVAC solution is limited by the distance to shore and by the wind transmitted power. HVDC options do not show these limitations, but are more expensive and more delicate to deal with, because there is a lack of operational experience, so far....

  9. Simulation of the full and part load energy consumption of HVAC system of building

    Energy Technology Data Exchange (ETDEWEB)

    Samuel, A.E.; Chia, T.H.

    1983-01-01

    A model based on dynamic heat transfers through the building envelope and between the contents inside the building is developed. This model has been incorporated into the Computer Aided Building Airconditioning Requirement and Environmental Temperature Simulation (CABARETS) program. The model takes into account the interaction between the external excitation, building envelope, contents inside the building, air handling systems and the mechanical equipment. An iterative numerical procedure has been implemented to solve the simultaneous heat transfer equations for the various components of the system. The indoor temperature and humidity variations with or without the operation of the HVAC system are established, and the energy requirements for maintaining the controlled environment are computed. The electrical power requirement for operating the HVAC mechanical equipment is estimated by the model, and the values are compared with the observed electricity consumption for the mechanical services.

  10. Study of active noise control system for a commercial HVAC unit

    Science.gov (United States)

    Devineni, Naga

    Acoustic noise is a common problem in everyday life. If the appliances that are present in the work and living areas generate noise then it's a serious problem. One such appliance is the Heating, Ventilation and Air-conditioning system (HVAC) in which blower fan and compressor units are housed together. Operation of a HVAC system creates two kinds of noise. One is the noise due to the air flow and the other is the result of the compressor. Both of them exhibit different signal properties and need different strategies to control them. There has been previous efforts in designing noise control systems that can control noise from the HVAC system. These include passive methods which use sound absorption materials to attenuate noise and active methods which cancel noise by generating anti-noise. Passive methods are effective in limiting the high frequency noise, but are inefficient in controlling low frequency noise from the compressor. Compressor noise is one of the strong low frequency components that propagate through the walls, therefore there is need for deploying active signal processing methods that consider the signal properties into consideration to cancel the noise acoustically. The quasi periodic nature of the compressor noise is exploited in noise modeling which aids in implementing an adaptive linear prediction filter in estimating the anti noise [12]. In this thesis, a multi channel architecture has been studied for a specific HVAC system in order to improve noise cancellation by creating larger quiet zone. In addition to the multi-channel architecture, a real time narrow band Active Noise Control (ANC) was employed to cancel noise under practical conditions.

  11. Changes in airborne fungi from the outdoors to indoor air; large HVAC systems in nonproblem buildings in two different climates.

    Science.gov (United States)

    Kemp, P C; Neumeister-Kemp, H G; Esposito, B; Lysek, G; Murray, F

    2003-01-01

    Little is known about the changes in occurrence and distribution of airborne fungi as they are transported in the airstream from the outdoor air through the heating, ventilation, and air conditioning (HVAC) system to the indoor air. To better understand this, airborne fungi were analyzed in the HVAC systems of two large office buildings in different climate zones. Fungal samples were taken in each of the walk-in chambers of the HVAC systems using a six-stage Andersen Sampler with malt extract agar. Results showed that fungal species changed with different locations in the HVAC systems. The outdoor air intake produced the greatest filtration effect for both the counts and species of outdoor air fungi. The colony forming unit (CFU) counts and species diversity was further reduced in the air directly after the filters. The cooling coils also had a substantial filtration effect. However, in room air the CFU counts were double and the mixture of fungal species was different from the air leaving the HVAC system at the supply air outlet in most locations. Diffusion of outdoor air fungi to the indoors did not explain the changes in the mixture of airborne fungi from the outdoor air to the indoor air, and some of the fungi present in the indoor air did not appear to be transported indoors by the HVAC systems.

  12. Commissioning of building HVAC systems for improvement of energy performance; Commissioning of building HVAC systems for improvement of energy performance. Teilnahme IEA-ECBCS Annex 40 (Betreiberkompetenz)

    Energy Technology Data Exchange (ETDEWEB)

    Chuard, J.-M.

    2005-06-15

    This paper takes a look at the tasks performed in Task 40 of the 'Energy Conservation in Buildings and Community Systems ECBCS' programme of the International Energy Agency IEA that is taking a look at the commissioning of building HVAC systems with the aim of improving the energy performance of such systems. Emphasis is put on the Swiss contribution to the task. This well-illustrated paper presents information on the structure of the task, time-lines and a diagram for its implementation structures. Also, the countries participating in Task 40 and their representatives are listed, and various work already published by the annex is noted. The paper places a focus on operator competence and lists points to be taken into account when carrying out work on optimising energy consumption. The various processes involved are noted and discussed. Management guidelines are presented and economical and market aspects are discussed. Finally, projects that will continue the work are noted.

  13. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  14. HVAC DDC控制系统的能量管理研究%Study of Energy Management Functions in DDC System for HVAC

    Institute of Scientific and Technical Information of China (English)

    郑萍; 张家川; 潘世永

    2000-01-01

    本文作者论述了HVAC的DDC控制方式及其控制与能量管理相结合的特点,并提出了几种能量管理程序,以及该程序的节能作用.%This paper describes the DDC for HVAC control system and the characteristics of the combination between control and energy management.It gives several energy management programs and analyzes the function of the progrmas in energy saving.

  15. A new pulse modulation adaptive controller (PMAC) applied to HVAC systems

    Energy Technology Data Exchange (ETDEWEB)

    Salsbury, T.I. [Johnson Controls Inc., Milwaukee (United States)

    2002-12-01

    The paper proposes a new switching control law (pulse modulation adaptive controller, PMAC) that implements pulse-width-pulse-frequency modulation. Pulse durations are determined to maintain the amplitude of variation in the controlled variable at or below a user-defined level. In addition to providing quantifiable control performance, PMAC can reduce component wear by issuing fewer switches than conventional control schemes. The control law is developed around a first-order system characterization but incorporates an adaptive loop, which allows application to a wide range of non-first-order and also time-variant systems. Test results are presented from applying PMAC to both simulated and real HVAC systems. (author)

  16. Power system technical performance issues related to the application of long HVAC cables

    DEFF Research Database (Denmark)

    Wiechowski, on behalf of Cigre WG C4.502, W.; Sluis, L. V. der; Ohno, Teruo

    2011-01-01

    This paper reports the progress of work of Cigre Working Group C4.502 “Power system technical performance issues related to the application of long HVAC cables”. The primary goal of the WG C4.502 is to write a technical brochure that will serve as practical guide for performing studies necessary...... for assessing the technical performance of HV/EHV systems with large share of AC cable lines. This paper besides providing a background for formulation of WG C4.502 and its overall aim, describes the tasks that were accomplished before the interim report was submitted to Study Committee C4 System Technical...

  17. Power System Technical Performance Issues related to the Application of Long HVAC Cables

    DEFF Research Database (Denmark)

    Wiechowski, W.; der Sluis, L.V.; Ohno, Teruo

    2011-01-01

    This paper reports the progress of work of Cigre Working Group C4.502 “Power system technical performance issues related to the application of long HVAC cables”. The primary goal of the WG C4.502 is to write a technical brochure that will serve as practical guide for performing studies necessary...... for assessing the technical performance of HV/EHV systems with large share of AC cable lines. This paper besides providing a background for formulation of WG C4.502 and its overall aim, describes the tasks that were accomplished before the interim report was submitted to Study Committee C4 System Technical...

  18. Evaluation of Heating, Ventilation, and Air conditioning (HVAC System Performance in an Administrative Building in Tehran (Iran

    Directory of Open Access Journals (Sweden)

    H. Mari Oriyad

    2014-09-01

    Full Text Available Introduction: One of the factors influencing on indoor air quality of the buildings is performance of HVAC (heating, ventilation, and air conditioning systems. These systems supply clean and odorless air, with temperature, humidity, and air velocity within comfort ranges for the residents. The aim of this study was to evaluate performance HVAC system in an administrative building in Tehran. .Material and Method: A questionnaire, developed in their research was used to assess the building occupants’ perception about the performance of HVAC system. To evaluate the performance of HVAC systems, air velocities were measured in the diffusers using a thermal anemometer. Moreover, CO2 concentration, air temperature and relative humidity were measured in the whole floors of the building. Air distribution inside the building was evaluated using smoke test. .Results: Most of the studied people complained about the direction of airflow, thermal conditions and cigarette odor. The highest level of carbon dioxide was measured at 930 ppm inside the restaurant. The maximum and minimum air temperatures and relative humidity were measured 28.3-13.8° C and 28.4-23% respectively. Smoke test showed that the air distribution/direction wasn’t suitable in one third of air diffusers. .Conclusion: Improper air distribution / direction was the main problem with the studied HVAC system which could be corrected by adjusting and balancing of the system.

  19. A Subspace Identification Method for Detecting Abnormal Behavior in HVAC Systems

    Directory of Open Access Journals (Sweden)

    Dimitris Sklavounos

    2015-01-01

    Full Text Available A method for the detection of abnormal behavior in HVAC systems is presented. The method combines deterministic subspace identification for each zone independently to create a system model that produces the anticipated zone’s temperature and the sequential test CUSUM algorithm to detect drifts of the rate of change of the difference between the real and the anticipated measurements. Simulation results regarding the detection of infiltration heat losses and the detection of exogenous heat gains such as fire demonstrate the effectiveness of the proposed method.

  20. Design and Implementation of Energy Efficiency in HVAC Systems Based on Robust PID Control for Industrial Applications

    Directory of Open Access Journals (Sweden)

    Muharrem Imal

    2015-01-01

    Full Text Available Energy efficiency in heating, ventilating, and air-conditioning (HVAC systems is a primary concern in process projects, since the energy consumption has the highest percentage in HVAC for all processes. Without sacrifice of thermal comfort, to reset the suitable operating parameters, such as the humidity and air temperature, would have energy saving with immediate effect. In this paper, the simulation-optimization approach described the effective energy efficiency for HVAC systems which are used in industrial process. Due to the complex relationship of the HVAC system parameters, it is necessary to suggest optimum settings for different operations in response to the dynamic cooling loads and changing weather conditions during a year. Proportional-integral-derivative (PID programming was developed which can effectively handle the discrete, nonlinear and highly constrained optimization problems. Energy efficiency process has been made by controlling of alternative current (AC drivers for ventilation and exhaust fans, according to supplied air flow capacity and differential air pressure between supplied and exhaust air. Supervisory controller software was developed by using programmable controllers and human machine interface (HMI units. The new designed HVAC control system would have a saving potential of about 40% as compared to the existing operational settings, without any extra cost.

  1. Energy fan power consumption comparison of subway station HVAC system

    Institute of Scientific and Technical Information of China (English)

    JIANGYong; ZHUYingxin

    2003-01-01

    Subway thermal environment control system is a mass energy consumed system. The fan operation is the Key of energy saving. Some feasible fan operation modes are proposed and compared in this paper from the view of energy and operation cost saving. It is concluded that VAV is the optimal operation mode for metro system with highest energy saving.

  2. A Comfort-Aware Energy Efficient HVAC System Based on the Subspace Identification Method

    Directory of Open Access Journals (Sweden)

    O. Tsakiridis

    2016-01-01

    Full Text Available A proactive heating method is presented aiming at reducing the energy consumption in a HVAC system while maintaining the thermal comfort of the occupants. The proposed technique fuses time predictions for the zones’ temperatures, based on a deterministic subspace identification method, and zones’ occupancy predictions, based on a mobility model, in a decision scheme that is capable of regulating the balance between the total energy consumed and the total discomfort cost. Simulation results for various occupation-mobility models demonstrate the efficiency of the proposed technique.

  3. Development of DMC controllers for temperature control of a room deploying the displacement ventilation HVAC system

    Directory of Open Access Journals (Sweden)

    Zhicheng Li, Ramesh K. Agarwal, Huijun Gao

    2013-01-01

    Full Text Available In this paper, by developing a new Dynamic Matrix Control (DMC method, we develop a controller for temperature control of a room cooled by a displacement ventilation HVAC system. The fluid flow and heat transfer inside the room are calculated by solving the Reynolds-Averaged Navier-Stokes (RANS equations including the effects of buoyancy in conjunction with a two-equation realizable k - epsilon turbulence model. Thus the physical environment is represented by a nonlinear system of partial differential equations. The system also has a large time delay because of the slowness of the heat exchange. The goal of the paper is to develop a controller that will maintain the temperature at three points near three different walls in a room within the specified upper and lower bounds. In order to solve this temperature control problem at three different points in the room, we develop a special DMC method. The results show that the newly developed DMC controller is an effective controller to maintain temperature within desired bounds at multiple points in the room and also saves energy when compared to other controllers. This DMC method can also be employed to develop controllers for other HVAC systems such as the overhead VAV (Variable Air Volume system and the radiant cooling hydronic system.

  4. Development of DMC controllers for temperature control of a room deploying the displacement ventilation HVAC system

    Energy Technology Data Exchange (ETDEWEB)

    Li, Zhicheng; Agarwal, Ramesh K. [Department of Mechanical Engineering and Materials Science, Washington University in Saint Louis, MO 63130 (United States); Gao, Huijun [Research Institute of Intelligent Control and Systems, Harbin Institute of Technology, Harbin 150001 (China)

    2013-07-01

    In this paper, by developing a new Dynamic Matrix Control (DMC) method, we develop a controller for temperature control of a room cooled by a displacement ventilation HVAC system. The fluid flow and heat transfer inside the room are calculated by solving the Reynolds-Averaged Navier-Stokes (RANS) equations including the effects of buoyancy in conjunction with a two-equation realizable k - epsilon turbulence model. Thus the physical environment is represented by a nonlinear system of partial differential equations. The system also has a large time delay because of the slowness of the heat exchange. The goal of the paper is to develop a controller that will maintain the temperature at three points near three different walls in a room within the specified upper and lower bounds. In order to solve this temperature control problem at three different points in the room, we develop a special DMC method. The results show that the newly developed DMC controller is an effective controller to maintain temperature within desired bounds at multiple points in the room and also saves energy when compared to other controllers. This DMC method can also be employed to develop controllers for other HVAC systems such as the overhead VAV (Variable Air Volume) system and the radiant cooling hydronic system.

  5. Tools for Evaluating Fault Detection and Diagnostic Methods for HVAC Secondary Systems

    Science.gov (United States)

    Pourarian, Shokouh

    Although modern buildings are using increasingly sophisticated energy management and control systems that have tremendous control and monitoring capabilities, building systems routinely fail to perform as designed. More advanced building control, operation, and automated fault detection and diagnosis (AFDD) technologies are needed to achieve the goal of net-zero energy commercial buildings. Much effort has been devoted to develop such technologies for primary heating ventilating and air conditioning (HVAC) systems, and some secondary systems. However, secondary systems, such as fan coil units and dual duct systems, although widely used in commercial, industrial, and multifamily residential buildings, have received very little attention. This research study aims at developing tools that could provide simulation capabilities to develop and evaluate advanced control, operation, and AFDD technologies for these less studied secondary systems. In this study, HVACSIM+ is selected as the simulation environment. Besides developing dynamic models for the above-mentioned secondary systems, two other issues related to the HVACSIM+ environment are also investigated. One issue is the nonlinear equation solver used in HVACSIM+ (Powell's Hybrid method in subroutine SNSQ). It has been found from several previous research projects (ASRHAE RP 825 and 1312) that SNSQ is especially unstable at the beginning of a simulation and sometimes unable to converge to a solution. Another issue is related to the zone model in the HVACSIM+ library of components. Dynamic simulation of secondary HVAC systems unavoidably requires an interacting zone model which is systematically and dynamically interacting with building surrounding. Therefore, the accuracy and reliability of the building zone model affects operational data generated by the developed dynamic tool to predict HVAC secondary systems function. The available model does not simulate the impact of direct solar radiation that enters a zone

  6. Modernisation of space HVAC systems with high energy consumption; Sanierung von RLT-Anlagen mit hohen Energieverbraeuchen

    Energy Technology Data Exchange (ETDEWEB)

    Willan, U. [ROM (Rud. Otto Meyer) - Technik fuer Mensch und Umwelt, Hamburg (Germany). Zentralbereich Ingenieurtechnik

    1997-12-31

    For office buildings and similarly used buildings, concepts are developed for the modernization of space hvac systems. The state of work in the following sectors is discussed: optimum comparison processes for space HVAC systems, measurements to assess the performance of alternative dehumidification and cooling systems, heat-physiological space model. (MSK) [Deutsch] Fuer Buerobauten und Gebaeude aehnlicher Nutzung werden Sanierungskonzepte fuer RLT-Anlagen erarbeitet. Im Folgenden wird der Stand der Arbeiten in den Bereichen: optimale Vergleichsprozesse fuer RLT-Anlagen, messtechnische Beurteilung alternativer Entfeuchtungs- und Kuehlsysteme sowie ein waermetechnisches Raummodell erlaeutert.

  7. COMPREHENSIVE DIAGNOSTIC AND IMPROVEMENT TOOLS FOR HVAC-SYSTEM INSTALLATIONS IN LIGHT COMMERCIAL BUILDINGS

    Energy Technology Data Exchange (ETDEWEB)

    Abram Conant; Mark Modera; Joe Pira; John Proctor; Mike Gebbie

    2004-10-31

    Proctor Engineering Group, Ltd. (PEG) and Carrier-Aeroseal LLP performed an investigation of opportunities for improving air conditioning and heating system performance in existing light commercial buildings. Comprehensive diagnostic and improvement tools were created to address equipment performance parameters (including airflow, refrigerant charge, and economizer operation), duct-system performance (including duct leakage, zonal flows and thermal-energy delivery), and combustion appliance safety within these buildings. This investigation, sponsored by the National Energy Technology Laboratory, a division of the U.S. Department of Energy, involved collaboration between PEG and Aeroseal in order to refine three technologies previously developed for the residential market: (1) an aerosol-based duct sealing technology that allows the ducts to be sealed remotely (i.e., without removing the ceiling tiles), (2) a computer-driven diagnostic and improvement-tracking tool for residential duct installations, and (3) an integrated diagnosis verification and customer satisfaction system utilizing a combined computer/human expert system for HVAC performance. Prior to this work the aerosol-sealing technology was virtually untested in the light commercial sector--mostly because the savings potential and practicality of this or any other type of duct sealing had not been documented. Based upon the field experiences of PEG and Aeroseal, the overall product was tailored to suit the skill sets of typical HVAC-contractor personnel.

  8. 10 CFR 434.517 - HVAC systems and equipment.

    Science.gov (United States)

    2010-01-01

    ... zone Packaged terminal air conditioner with space heater or heat pump, one heating/cooling unit per... conditioner w/space heater (Note 8) Hot water (Note 8, 12) Hot water (Note 12) or electric resistance (Note B... and Reference Buildings 1,2 Building/space occupancy System No. (Table 517.4.1) Remarks (Table 517.4.1...

  9. Simulation Study of IMC and Fuzzy Controller for HVAC System

    Directory of Open Access Journals (Sweden)

    Umamaheshwari

    2009-06-01

    Full Text Available This paper presents how the fuzzy logic controller is used to solve the control problems of complex and non linear process and show that it is more robust and their performance are less sensitive to parametric variations than conventional controllers. These systems will yield a linear response when compared to ordinary controllers. The main advantage of Fuzzy control over conventional controllers is regulation can be done without over shoot.

  10. Modular VSC converter based HVDC power transmission from offshore wind power plant: Compared to the conventional HVAC system

    DEFF Research Database (Denmark)

    Sharma, Ranjan; Rasmussen, Tonny Wederberg; Jensen, Kim Høj;

    2010-01-01

    power transmission options with HVDC systems are under consideration. In this paper, a comparison between a conventional HVAC transmission system and a HVDC system equipped with modular voltage source converters is provided. The comparison is based on the total energy transmission capability...

  11. Integrated Heat Pump HVAC Systems for Near-Zero-Energy Homes - Business Case Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, Van D [ORNL

    2007-05-01

    The long range strategic goal of the Department of Energy's Building Technologies (DOE/BT) Program is to create, by 2020, technologies and design approaches that enable the construction of net-zero energy homes at low incremental cost (DOE/BT 2005). A net zero energy home (NZEH) is a residential building with greatly reduced needs for energy through efficiency gains, with the balance of energy needs supplied by renewable technologies. While initially focused on new construction, these technologies and design approaches are intended to have application to buildings constructed before 2020 as well resulting in substantial reduction in energy use for all building types and ages. DOE/BT's Emerging Technologies (ET) team is working to support this strategic goal by identifying and developing advanced heating, ventilating, air-conditioning, and water heating (HVAC/WH) technology options applicable to NZEHs. Although the energy efficiency of heating, ventilating, and air-conditioning (HVAC) equipment has increased substantially in recent years, new approaches are needed to continue this trend. Dramatic efficiency improvements are necessary to enable progress toward the NZEH goals, and will require a radical rethinking of opportunities to improve system performance. The large reductions in HVAC energy consumption necessary to support the NZEH goals require a systems-oriented analysis approach that characterizes each element of energy consumption, identifies alternatives, and determines the most cost-effective combination of options. In particular, HVAC equipment must be developed that addresses the range of special needs of NZEH applications in the areas of reduced HVAC and water heating energy use, humidity control, ventilation, uniform comfort, and ease of zoning. In FY05 ORNL conducted an initial Stage 1 (Applied Research) scoping assessment of HVAC/WH systems options for future NZEHs to help DOE/BT identify and prioritize alternative approaches for further

  12. Preliminary CFD Analysis for HVAC System Design of a Containment Building

    Energy Technology Data Exchange (ETDEWEB)

    Son, Sung Man; Choi, Choengryul [ELSOLTEC, Yongin (Korea, Republic of); Choo, Jae Ho; Hong, Moonpyo; Kim, Hyungseok [KEPCO Engineering and Construction, Gimcheon (Korea, Republic of)

    2016-10-15

    HVAC (Heating, Ventilation, Air Conditioning) system has been mainly designed based on overall heat balance and averaging concepts, which is simple and useful for designing overall system. However, such a method has the disadvantage that cannot predict the local flow and temperature distributions in a containment building. In this study, a CFD (Computational Fluid Dynamics) preliminary analysis is carried out to obtain detailed flow and temperature distributions in a containment building and to ensure that such information can be obtained via CFD analysis. This approach can be useful for hydrogen analysis in an accident related to hydrogen released into a containment building. In this study, CFD preliminary analysis has been performed to obtain the detailed information of the reactor containment building by using the CFD analysis techniques and to ensure that such information can be obtained via CFD analysis. We confirmed that CFD analysis can offer enough detailed information about flow patterns and temperature field and that CFD technique is a useful tool for HVAC design of nuclear power plants.

  13. Energy efficient model based algorithm for control of building HVAC systems.

    Science.gov (United States)

    Kirubakaran, V; Sahu, Chinmay; Radhakrishnan, T K; Sivakumaran, N

    2015-11-01

    Energy efficient designs are receiving increasing attention in various fields of engineering. Heating ventilation and air conditioning (HVAC) control system designs involve improved energy usage with an acceptable relaxation in thermal comfort. In this paper, real time data from a building HVAC system provided by BuildingLAB is considered. A resistor-capacitor (RC) framework for representing thermal dynamics of the building is estimated using particle swarm optimization (PSO) algorithm. With objective costs as thermal comfort (deviation of room temperature from required temperature) and energy measure (Ecm) explicit MPC design for this building model is executed based on its state space representation of the supply water temperature (input)/room temperature (output) dynamics. The controllers are subjected to servo tracking and external disturbance (ambient temperature) is provided from the real time data during closed loop control. The control strategies are ported on a PIC32mx series microcontroller platform. The building model is implemented in MATLAB and hardware in loop (HIL) testing of the strategies is executed over a USB port. Results indicate that compared to traditional proportional integral (PI) controllers, the explicit MPC's improve both energy efficiency and thermal comfort significantly.

  14. Learning Based Bidding Strategy for HVAC Systems in Double Auction Retail Energy Markets

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Yannan; Somani, Abhishek; Carroll, Thomas E.

    2015-07-01

    In this paper, a bidding strategy is proposed using reinforcement learning for HVAC systems in a double auction market. The bidding strategy does not require a specific model-based representation of behavior, i.e., a functional form to translate indoor house temperatures into bid prices. The results from reinforcement learning based approach are compared with the HVAC bidding approach used in the AEP gridSMART® smart grid demonstration project and it is shown that the model-free (learning based) approach tracks well the results from the model-based behavior. Successful use of model-free approaches to represent device-level economic behavior may help develop similar approaches to represent behavior of more complex devices or groups of diverse devices, such as in a building. Distributed control requires an understanding of decision making processes of intelligent agents so that appropriate mechanisms may be developed to control and coordinate their responses, and model-free approaches to represent behavior will be extremely useful in that quest.

  15. Energy Savings Potential of Flexible and Adaptive HVAC Distribution Systems for Office Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Loftness, Vivian; Brahme, Rohini; Mondazzi, Michelle; Vineyard, Edward; MacDonald, Michael

    2002-06-01

    It has been understood by architects and engineers that office buildings with easily re-configurable space and flexible mechanical and electrical systems are able to provide comfort that increases worker productivity while using less energy. Raised floors are an example of how fresh air, thermal conditioning, lighting needs, and network access can be delivered in a flexible manner that is not ''embedded'' within the structure. What are not yet documented is how well these systems perform and how much energy they can save. This area is being investigated in phased projects of the 21st Century Research Program of the Air-conditioning and Refrigeration Technology Institute. For the initial project, research teams at the Center for Building Performance and Diagnostics, Pittsburgh, Pennsylvania, and Oak Ridge National Laboratory, Oak Ridge, Tennessee, documented the diversity, performance, and incidence of flexible and adaptive HVAC systems. Information was gathered worldwide from journal and conference articles, case studies, manufactured products and assemblies, and interviews with design professionals. Their report thoroughly describes the variety of system types along with the various design alternatives observed for plenums, diffusers, individual control, and system integration. Many of the systems are illustrated in the report and the authors provide quantitative and qualitative comparisons. Among conclusions regarding key design issues, and barriers to widespread adoption, the authors state that flexible and adaptive HVAC systems, such as underfloor air, perform as well if not better than ceiling-based systems. Leading engineers have become active proponents after their first experience, which is resulting in these flexible and adaptive HVAC systems approaching 10 percent of the new construction market. To encourage adoption of this technology that improves thermal comfort and indoor air quality, follow-on work is required to further document

  16. Cutting the cost of hospital HVAC.

    Science.gov (United States)

    Ruddell, Steve

    2011-09-01

    Steve Ruddell, head of global marketing, Motors & Generators, at ABB, emphasises the importance of a good motor management and maintenance policy in getting the best performance from, and reducing the energy consumption of, hospitals' HVAC systems, also explaining why investing in energy-efficient, low voltage drives, and high efficiency electric motors, to control such equipment, can pay major dividends for estates and facilities teams.

  17. Building HVAC control knowledge data schema – Towards a unified representation of control system knowledge

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yan; Treado, Stephen J.; Messner, John I.

    2016-12-01

    Building control systems for Heating, Ventilation, and Air Conditioning (HVAC) play a key role in realizing the functionality and operation of building systems and components. Building Control Knowledge (BCK) is the logic and algorithms embedded throughout building control system. There are different methods to represent the BCK. These methods differ in the selection of BCK representing elements and the format of those elements. There is a lack of standard data schema, for storing, retrieving, and reusing structured BCK. In this study, a modular data schema is created for BCK representation. The data schema contains eleven representing elements, i.e., control module name, operation mode, system schematic, control flow diagram, data point, alarm, parameter, control sequence, function, and programming code. Each element is defined with specific attributes. This data schema is evaluated through a case study demonstration. The demonstration shows a new way to represent the BCK with standard formats.

  18. The integrated engineering system for the HVAC branch. Annex; Das integrierte Ingenieursystem fuer die Haustechnikbranche; Anhang

    Energy Technology Data Exchange (ETDEWEB)

    Allenspach, J.; Duppenthaler, A.; Helbling, R.; Kohler, T.; Mantel, R.; Meineke, E. [Paul Scherrer Inst. (PSI), Villigen (Switzerland)

    1994-01-01

    In 1987, the intention of the former Swiss Federal Institute for Reactor Research was to initiate a transfer of know-how into practice by launching this project. The increasing need for software engineering tools by heating, ventilation and air conditioning (HVAC) companies demanded a new tool; to realise it, a joint venture project with private industry should concentrate the individual capabilities of each partner toward this goal. The present report describes the concept of the integrated engineering system, its user interface, the models, graphics, tools, multiuser operation and the system boundary. Results of field tests are presented together with information of the availability of the system. The annex contains the agreement for the usage of the public-domain-version of the system, experience reports of pilot clients and the end user`s and developer`s documentation. (author) figs., tabs., refs.

  19. A new HVAC system based on cogeneration by an i.c. engine

    Energy Technology Data Exchange (ETDEWEB)

    Lazzarin, R.M. [Istituto di Ingeneria Gestionale, Universita di Padova (Italy); Longo, G.A.; Romagnoni, P.C. [Istituto di Fisica Tecnica, Universita di Padova (Italy)

    1996-07-01

    A new HVAC system is proposed and studied. The plant is equipped with a reciprocating i.c. gas engine which produces electric energy with heat recovery from the jacket water heat and the exhaust. The electric energy serves the lighting and emf for the building and individual room reversible air-water heat pumps that mainly satisfy sensible cooling and a fraction of the winter heating load. An open-cycle absorption system, which treats the primary air, meets the summer latent load and year round ventilation requirements. In winter, the system operates as an open-cycle heat pump. The regeneration of the sorbent is obtained by the i.c. engine heat recovery. The proposed system is analysed by comparing its performance with a traditional plant, both in summer and winter mode. (Author)

  20. A new HVAC system based on cogeneration by an internal combustion engine

    Energy Technology Data Exchange (ETDEWEB)

    Lazzarin, R.M [Instituto di Ingegneria Gestionale, Universita di Padova, Vicenza (Italy); Longo, G.A.; Romagnoni, P.C. [Istituto di Fisica Technica, Universita di Padova, Padova (Italy)

    1997-06-01

    A new HVAC system is proposed and studied. The plant consists of a reciprocating internal combustion gas engine, producing electrical energy with heat recovery from the jacket water heat and the exhaust. The electricity serves lighting, emf for the building and individual room reversible air-water heat pumps that satisfy mainly sensible cooling and a fraction of the winter heating load. An open cycle absorption system which treats the primary air meets the summer latent load and year round ventilation requirements. In winter the system operates as an open cycle heat pump. The regeneration of the sorbent is obtained by the internal combustion engine heat recovery. The proposed system is analyzed comparing its performance with a traditional plant both in summer and winter mode. 8 refs.

  1. Strategy Guideline: HVAC Equipment Sizing

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2012-02-01

    The heating, ventilation, and air conditioning (HVAC) system is arguably the most complex system installed in a house and is a substantial component of the total house energy use. A right-sized HVAC system will provide the desired occupant comfort and will run efficiently. This Strategy Guideline discusses the information needed to initially select the equipment for a properly designed HVAC system. Right-sizing of an HVAC system involves the selection of equipment and the design of the air distribution system to meet the accurate predicted heating and cooling loads of the house. Right-sizing the HVAC system begins with an accurate understanding of the heating and cooling loads on a space; however, a full HVAC design involves more than just the load estimate calculation - the load calculation is the first step of the iterative HVAC design procedure. This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, Florida. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  2. Chapter 19: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol

    Energy Technology Data Exchange (ETDEWEB)

    Romberger, J.

    2014-11-01

    The HVAC Controls Evaluation Protocol is designed to address evaluation issues for direct digital controls/energy management systems/building automation systems (DDC/EMS/BAS) that are installed to control heating, ventilation, and air-conditioning (HVAC) equipment in commercial and institutional buildings. (This chapter refers to the DDC/EMS/BAS measure as HVAC controls.) This protocol may also be applicable to industrial facilities such as clean rooms and labs, which have either significant HVAC equipment or spaces requiring special environmental conditions. This protocol addresses only HVAC-related equipment and the energy savings estimation methods associated with installing such control systems as an energy efficiency measure. The affected equipment includes: Air-side equipment (air handlers, direct expansion systems, furnaces, other heating- and cooling-related devices, terminal air distribution equipment, and fans); Central plant equipment (chillers, cooling towers, boilers, and pumps). These controls may also operate or affect other end uses, such as lighting, domestic hot water, irrigation systems, and life safety systems such as fire alarms and other security systems. Considerable nonenergy benefits, such as maintenance scheduling, system component troubleshooting, equipment failure alarms, and increased equipment lifetime, may also be associated with these systems. When connected to building utility meters, these systems can also be valuable demand-limiting control tools. However, this protocol does not evaluate any of these additional capabilities and benefits.

  3. Regulation study for the facility control system design at the Facility Operations Center at TA55

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-16

    NMT-8 is proposing to upgrade the existing Facility Control System (FCS) located within the Facility Operations Center (FOC) at the TA-55 Plutonium Processing and Handling Facility (PPHF). The FCS modifications will upgrade the existing electronics to provide better reliability of system functions. Changes include replacement of the FCS computers and field multiplex units which are used for transmitting systems data. Data collected at the FCS include temperature, pressure, contact closures, etc., and are used for monitoring and/or control of key systems at TA-55. Monitoring is provided for the electrical power system status, PF-4 HVAC air balance status (Static Differential pressure), HVAC fan system status, site chill water return temperature, fire system information, and radioactive constant air monitors alarm information, site compressed air pressure and other key systems used at TA-55. Control output signals are provided for PF-4 HVAC systems, and selected alarms for criticality, fire, loss of pressure in confinement systems. A detailed description of the FCS modifications is provided in Section 2.

  4. Experimental investigation of cooling performance of a novel HVAC system combining natural ventilation with diffuse ceiling inlet and TABS

    DEFF Research Database (Denmark)

    Yu, Tao; Heiselberg, Per Kvols; Lei, Bo;

    2015-01-01

    Highlights •An experimental investigation of cooling performance of a combined HVAC system is carried out. •Cooling performance of TABS with and without the influence of diffuse ceiling is analyzed. •Radiant and convective heat transfer coefficients of TABS cooling are studied. •Cooling components...

  5. Value impact analysis of Generic Issue 143, Availability of Heating, Ventilation, Air Conditioning (HVAC) and Chilled Water Systems

    Energy Technology Data Exchange (ETDEWEB)

    Daling, P.M.; Marler, J.E.; Vo, T.V.; Phan, H.; Friley, J.R. [Pacific Northwest Lab., Richland, WA (United States)

    1993-11-01

    This study evaluates the values (benefits) and impacts (costs) associated with potential resolutions to Generic Issue 143, ``Availability of HVAC and Chilled Water Systems.`` The study identifies vulnerabilities related to failures of HVAC, chilled water, and room cooling systems; develops estimates of room heatup rates and safety-related equipment vulnerabilities following losses of HVAC/room cooler systems; develops estimates of the core damage frequencies and public risks associated with failures of these systems; develops three proposed resolution strategies to this generic issue; and performs a value/impact analysis of the proposed resolutions. Existing probabilistic risk assessments for four representative plants, including one plant from each vendor, form the basis for the core damage frequency and public risk calculations. Both internal and external events were considered. It was concluded that all three proposed resolution strategies exceed the $1,000/person-rem cost-effectiveness ratio. Additional evaluations were performed to develop ``generic`` insights on potential design-related and configuration-related vulnerabilities and potential high-frequency ({approximately}1E-04/RY) accident sequences that involve failures of HVAC/room cooling functions. It was concluded that, although high-frequency accident sequences may exist at some plants, these high-frequency sequences are plant-specific in nature or have been resolved through hardware and/or operational changes. The plant-specific Individual Plant Examinations are an effective vehicle for identification and resolution of these plant-specific anomalies and hardware configurations.

  6. Parametric analysis of air–water heat recovery concept applied to HVAC systems: Effect of mass flow rates

    Directory of Open Access Journals (Sweden)

    Mohamad Ramadan

    2015-09-01

    Full Text Available In the last three decades, the world has experienced enormous increases in energy and fuel consumption as a consequence of the economic and population growth. This causes renewable energy and energy recovery to become a requirement in building designs rather than option. The present work concerns a coupling between energy recovery and Heating, Ventilating and Air Conditioning HVAC domains and aims to apply heat recovery concepts to HVAC applications working on refrigeration cycles. It particularly uses the waste energy of the condenser hot air to heat/preheat domestic water. The heat exchanger considered in the recovery system is concentric tube heat exchanger. A thermal modeling of the complete system as well as a corresponding iterative code are developed and presented. Calculations with the code are performed and give pertinent magnitude orders of energy saving and management in HVAC applications. A parametric analysis based on several water and air flow rates is carried out. It was shown that water can be heated from 25 to 70 °C depending on the mass flow rates and cooling loads of the HVAC system. The most efficient configurations are obtained by lowering the air flow rate of the condenser fan.

  7. A Study on the Application of UV Sterilization Method in HVAC System

    Energy Technology Data Exchange (ETDEWEB)

    Cho, S. W.; Park, J. S.; Seo, I. W.; Lim, K. R.; An, W. S.; Oh, S. H.; Lee, K. W.; Kim, J. G.; Kwon, S. J

    2005-04-15

    The objective of this report is to study on the application of UV sterilization method on HVAC system in building. One type of commercial UV lamp was utilized during this research. It was 1,050 mm length, 24.5 mm diameter, 65 w lamp output, single ended lamp intended for insertion into al frame from inside. Twenty six lamps were mounted and operated in cross flow. They were allowed to operate for at least 30 minutes prior to beginning each test. The test rig was operated at 2.5 m/s and 20 .deg. C, and the relatively humidity 21.6 %RH. The effect of UV sterilization are investigated that as the general virus about 94 %, the mold microbe about 64 % and the bacillus about 86 %, respectively. Following this report will be used important data for the design and manufacture of the UV.

  8. Simulative Study into the Development of a Hybrid HVDC System Through a Comparative Research with HVAC: a Futuristic Approach

    Directory of Open Access Journals (Sweden)

    R. S. Narayan

    2017-06-01

    Full Text Available High Voltage Direct Current Transmission (HVDC is considered a better solution for bulk long distance transmissions. The increased use of HVDC is a result of its advantages over the HVAC systems and especially of its fault stability nature. A better solution is proposed by using a Voltage Source Controlled–HVDC as one of the infeed for the Multi-Infeed HVDC (MIDC or MI-HVDC systems. The main advantage with the VSC converter is its flexible power control which enhances the stability of the MIDC systems. In this paper, the behavior of an HVDC system is compared with that of an HVAC during faults. A Hybrid HVDC system that includes a LCC as a rectifier unit and a VSC converter as the inverter is being proposed. It is considered suitable for MIDC systems and particularly for supplying a weak AC system. The performance of the system during steady state and transient conditions for all the proposed topologies including HVDC, HVAC and Hybrid HVDC are studied in MATLAB/SIMULINK. All of the proposed control strategies are evaluated via a series of simulation case studies.

  9. Energy Savings From System Efficiency Improvements in Iowa's HVAC SAVE Program

    Energy Technology Data Exchange (ETDEWEB)

    Yee, S. [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Baker, J. [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Brand, L. [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Wells, J. [Partnership for Advanced Residential Retrofit, Chicago, IL (United States)

    2013-08-01

    The objective of this project is to explore the energy savings potential of maximizing furnace and distribution system performance by adjusting operating, installation, and distribution conditions. The goal of the Iowa HVAC System Adjusted and Verified Efficiency (SAVE) program is to train contractors to measure installed system efficiency as a diagnostic tool to ensure that the homeowner achieves the energy reduction target for the home rather than simply performing a tune-up on the furnace or having a replacement furnace added to a leaky system. The PARR research team first examined baseline energy usage from a sample of 48 existing homes, before any repairs or adjustments were made, to calculate an average energy savings potential and to determine which system deficiencies were prevalent. The results of the baseline study of these homes found that, on average, about 10% of the space heating energy available from the furnace was not reaching the conditioned space. In the second part of the project, the team examined a sample of 10 homes that had completed the initial evaluation for more in-depth study. For these homes, the diagnostic data shows that it is possible to deliver up to 23% more energy from the furnace to the conditioned space by doing system tune ups with or without upgrading the furnace. Replacing the furnace provides additional energy reduction. The results support the author's belief that residential heating and cooling equipment should be tested and improved as a system rather than a collection of individual components.

  10. 石油钻机司钻房 HVAC 系统设计与分析%System Design and Analysis of HVAC System Design and Analysis of Driller Roon in Oil Rig

    Institute of Scientific and Technical Information of China (English)

    樊春明; 孔美虹; 韩俊; 张文英; 王长怀; 李永国

    2014-01-01

    介绍了石油钻机司钻房HVAC系统组成、工作原理、关键参数确定和主要部件设计及选型。%It introduces the composition, working theory, determination of key parameters, de-sign and selection of the main components of HVAC system of driller roon in oil rig .

  11. Estimating occupant satisfaction of HVAC system noise using quality assessment index.

    Science.gov (United States)

    Forouharmajd, Farhad; Nassiri, Parvin; Monazzam, Mohammad R; Yazdchi, Mohammadreza

    2012-01-01

    Noise may be defined as any unwanted sound. Sound becomes noise when it is too loud, unexpected, uncontrolled, happens at the wrong time, contains unwanted pure tones or unpleasant. In addition to being annoying, loud noise can cause hearing loss, and, depending on other factors, can affect stress level, sleep patterns and heart rate. The primary object for determining subjective estimations of loudness is to present sounds to a sample of listeners under controlled conditions. In heating, ventilation and air conditioning (HVAC) systems only the ventilation fan industry (e.g., bathroom exhaust and sidewall propeller fans) uses loudness ratings. In order to find satisfaction, percent of exposure to noise is the valuable issue for the personnel who are working in these areas. The room criterion (RC) method has been defined by ANSI standard S12.2, which is based on measured levels of in HVAC systems noise in spaces and is used primarily as a diagnostic tool. The RC method consists of a family of criteria curves and a rating procedure. RC measures background noise in the building over the frequency range of 16-4000 Hz. This rating system requires determination of the mid-frequency average level and determining the perceived balance between high-frequency (HF) sound and low-frequency (LF) sound. The arithmetic average of the sound levels in the 500, 1000 and 2000 Hz octave bands is 44.6 dB; therefore, the RC 45 curve is selected as the reference for spectrum quality evaluation. The spectral deviation factors in the LF, medium-frequency sound and HF regions are 2.9, 7.5 and -2.3, respectively, giving a Quality Assessment Index (QAI) of 9.8. This concludes the QAI is useful in estimating an occupant's probable reaction when the system design does not produce optimum sound quality. Thus, a QAI between 5 and 10 dB represents a marginal situation in which acceptance by an occupant is questionable. However, when sound pressure levels in the 16 or 31.5 Hz octave bands exceed 65

  12. Estimating occupant satisfaction of HVAC system noise using quality assessment index

    Directory of Open Access Journals (Sweden)

    Farhad Forouharmajd

    2012-01-01

    Full Text Available Noise may be defined as any unwanted sound. Sound becomes noise when it is too loud, unexpected, uncontrolled, happens at the wrong time, contains unwanted pure tones or unpleasant. In addition to being annoying, loud noise can cause hearing loss, and, depending on other factors, can affect stress level, sleep patterns and heart rate. The primary object for determining subjective estimations of loudness is to present sounds to a sample of listeners under controlled conditions. In heating, ventilation and air conditioning (HVAC systems only the ventilation fan industry (e.g., bathroom exhaust and sidewall propeller fans uses loudness ratings. In order to find satisfaction, percent of exposure to noise is the valuable issue for the personnel who are working in these areas. The room criterion (RC method has been defined by ANSI standard S12.2, which is based on measured levels of in HVAC systems noise in spaces and is used primarily as a diagnostic tool. The RC method consists of a family of criteria curves and a rating procedure. RC measures background noise in the building over the frequency range of 16-4000 Hz. This rating system requires determination of the mid-frequency average level and determining the perceived balance between high-frequency (HF sound and low-frequency (LF sound. The arithmetic average of the sound levels in the 500, 1000 and 2000 Hz octave bands is 44.6 dB; therefore, the RC 45 curve is selected as the reference for spectrum quality evaluation. The spectral deviation factors in the LF, medium-frequency sound and HF regions are 2.9, 7.5 and -2.3, respectively, giving a Quality Assessment Index (QAI of 9.8. This concludes the QAI is useful in estimating an occupant′s probable reaction when the system design does not produce optimum sound quality. Thus, a QAI between 5 and 10 dB represents a marginal situation in which acceptance by an occupant is questionable. However, when sound pressure levels in the 16 or 31.5 Hz octave

  13. Initial Business Case Analysis of Two Integrated Heat Pump HVAC Systems for Near-Zero-Energy Homes

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, Van D [ORNL

    2006-11-01

    The long range strategic goal of the Department of Energy's Building Technologies (DOE/BT) Program is to create, by 2020, technologies and design approaches that enable the construction of net-zero energy homes at low incremental cost (DOE/BT 2005). A net zero energy home (NZEH) is a residential building with greatly reduced needs for energy through efficiency gains, with the balance of energy needs supplied by renewable technologies. While initially focused on new construction, these technologies and design approaches are intended to have application to buildings constructed before 2020 as well resulting in substantial reduction in energy use for all building types and ages. DOE/BT's Emerging Technologies (ET) team is working to support this strategic goal by identifying and developing advanced heating, ventilating, air-conditioning, and water heating (HVAC/WH) technology options applicable to NZEHs. Although the energy efficiency of heating, ventilating, and air-conditioning (HVAC) equipment has increased substantially in recent years, new approaches are needed to continue this trend. Dramatic efficiency improvements are necessary to enable progress toward the NZEH goals, and will require a radical rethinking of opportunities to improve system performance. The large reductions in HVAC energy consumption necessary to support the NZEH goals require a systems-oriented analysis approach that characterizes each element of energy consumption, identifies alternatives, and determines the most cost-effective combination of options. In particular, HVAC equipment must be developed that addresses the range of special needs of NZEH applications in the areas of reduced HVAC and water heating energy use, humidity control, ventilation, uniform comfort, and ease of zoning. In FY05 ORNL conducted an initial Stage 1 (Applied Research) scoping assessment of HVAC/WH systems options for future NZEHs to help DOE/BT identify and prioritize alternative approaches for further

  14. An implementation of co-simulation for performance prediction of innovative integrated HVAC systems in buildings

    Energy Technology Data Exchange (ETDEWEB)

    Trcka, Marija; Wetter, Michael; Hensen, Jan L.M.

    2010-07-01

    Integrated performance simulation of buildings and heating, ventilation and air-conditioning (HVAC) systems can help reducing energy consumption and increasing level of occupant comfort. However, no singe building performance simulation (BPS) tool offers sufficient capabilities and flexibilities to accommodate the ever-increasing complexity and rapid innovations in building and system technologies. One way to alleviate this problem is to use co-simulation. The co-simulation approach represents a particular case of simulation scenario where at least two simulators solve coupled differential-algebraic systems of equations and exchange data that couples these equations during the time integration. This paper elaborates on issues important for co-simulation realization and discusses multiple possibilities to justify the particular approach implemented in a co-simulation prototype. The prototype is verified and validated against the results obtained from the traditional simulation approach. It is further used in a case study for the proof-of-concept, to demonstrate the applicability of the method and to highlight its benefits. Stability and accuracy of different coupling strategies are analyzed to give a guideline for the required coupling frequency. The paper concludes by defining requirements and recommendations for generic cosimulation implementations.

  15. Capability of air filters to retain airborne bacteria and molds in heating, ventilating and air-conditioning (HVAC) systems.

    Science.gov (United States)

    Möritz, M; Peters, H; Nipko, B; Rüden, H

    2001-07-01

    The capability of air filters (filterclass: F6, F7) to retain airborne outdoor microorganisms was examined in field experiments in two heating, ventilating and air conditioning (HVAC) systems. At the beginning of the 15-month investigation period, the first filter stages of both HVAC systems were equipped with new unused air filters. The number of airborne bacteria and molds before and behind the filters were determined simultaneously in 14 days-intervals using 6-stage Andersen cascade impactors. Under relatively dry ( 12 degrees C) outdoor air conditions air filters led to a marked reduction of airborne microorganism concentrations (bacteria by approximately 70% and molds by > 80%). However, during long periods of high relative humidity (> 80% R. H.) a proliferation of bacteria on air filters with subsequent release into the filtered air occurred. These microorganisms were mainly smaller than 1.1 microns therefore being part of the respirable fraction. The results showed furthermore that one possibility to avoid microbial proliferation is to limit the relative humidity in the area of the air filters to 80% R. H. (mean of 3 days), e.g. by using preheaters in front of air filters in HVAC-systems.

  16. Thermal room modelling adapted to the test of HVAC control systems; Modele de zone adapte aux essais de regulateurs de systemes de chauffage et de climatisation

    Energy Technology Data Exchange (ETDEWEB)

    Riederer, P.

    2002-01-15

    Room models, currently used for controller tests, assume the room air to be perfectly mixed. A new room model is developed, assuming non-homogeneous room conditions and distinguishing between different sensor positions. From measurement in real test rooms and detailed CFD simulations, a list of convective phenomena is obtained that has to be considered in the development of a model for a room equipped with different HVAC systems. The zonal modelling approach that divides the room air into several sub-volumes is chosen, since it is able to represent the important convective phenomena imposed on the HVAC system. The convective room model is divided into two parts: a zonal model, representing the air at the occupant zone and a second model, providing the conditions at typical sensor positions. Using this approach, the comfort conditions at the occupant zone can be evaluated as well as the impact of different sensor positions. The model is validated for a test room equipped with different HVAC systems. Sensitivity analysis is carried out on the main parameters of the model. Performance assessment and energy consumption are then compared for different sensor positions in a room equipped with different HVAC systems. The results are also compared with those obtained when a well-mixed model is used. A main conclusion of these tests is, that the differences obtained, when changing the position of the controller's sensor, is a function of the HVAC system and controller type. The differences are generally small in terms of thermal comfort but significant in terms of overall energy consumption. For different HVAC systems the cases are listed, in which the use of a simplified model is not recommended. (author)

  17. Computational Fluid Dynamic Modeling of Horizontal Air-Ground Heat Exchangers (HAGHE for HVAC Systems

    Directory of Open Access Journals (Sweden)

    Paolo Maria Congedo

    2014-12-01

    Full Text Available In order to satisfy the requirements of Directive 2010/31/EU for Zero Energy Buildings (ZEB, innovative solutions were investigated for building HVAC systems. Horizontal air-ground heat exchangers (HAGHE offer a significant contribution in reducing energy consumption for ventilation, using the thermal energy stored underground, in order to pre-heat or pre-cool the ventilation air, in winter and summer, respectively. This is particularly interesting in applications for industrial, commercial and education buildings where keeping the indoor air quality under control is extremely important. Experimental measurements show that, throughout the year, the outside air temperature fluctuations are mitigated at sufficient ground depth (about 3 m because of the high thermal inertia of the soil, the ground temperature is relatively constant and instead higher than that of the outside air in winter and lower in summer. The study aims to numerically investigate the behavior of HAGHE by varying the air flow rate and soil conductivity in unsteady conditions by using annual weather data of South-East Italy. The analysis shows that, in warm climates, the HAGHE brings a real advantage for only a few hours daily in winter, while it shows significant benefits in the summer for the cooling of ventilation air up to several temperature degrees, already by a short pipe.

  18. Switched Control Strategies of Aggregated Commercial HVAC Systems for Demand Response in Smart Grids

    Directory of Open Access Journals (Sweden)

    Kai Ma

    2017-07-01

    Full Text Available This work proposes three switched control strategies for aggregated heating, ventilation, and air conditioning (HVAC systems in commercial buildings to track the automatic generation control (AGC signal in smart grid. The existing control strategies include the direct load control strategy and the setpoint regulation strategy. The direct load control strategy cannot track the AGC signal when the state of charge (SOC of the aggregated thermostatically controlled loads (TCLs exceeds their regulation capacity, while the setpoint regulation strategy provides flexible regulation capacity, but causes larger tracking errors. To improve the tracking performance, we took the advantages of the two control modes and developed three switched control strategies. The control strategies switch between the direct load control mode and the setpoint regulation mode according to different switching indices. Specifically, we design a discrete-time controller and optimize the controller parameter for the setpoint regulation strategy using the Fibonacci optimization algorithm, enabling us to propose two switched control strategies across multiple time steps. Furthermore, we extend the switched control strategies by introducing a two-stage regulation in a single time step. Simulation results demonstrate that the proposed switched control strategies can reduce the tracking errors for frequency regulation.

  19. Breathing Easier: HVAC Specifications for Schools.

    Science.gov (United States)

    Trent, C. Curtis; Trent, Warren C.

    1996-01-01

    A major source of indoor air contamination in schools originates within the heating, ventilating, and air-conditioning systems (HVAC), with draw-through systems being the worst offenders. Lists provisions for designing an HVAC system and a set of criteria to adhere to when planning new construction or renovations. (nine references) (MLF)

  20. Breathing Easier: HVAC Specifications for Schools.

    Science.gov (United States)

    Trent, C. Curtis; Trent, Warren C.

    1996-01-01

    A major source of indoor air contamination in schools originates within the heating, ventilating, and air-conditioning systems (HVAC), with draw-through systems being the worst offenders. Lists provisions for designing an HVAC system and a set of criteria to adhere to when planning new construction or renovations. (nine references) (MLF)

  1. Investigation of the potential antimicrobial efficacy of sealants used in HVAC systems.

    Science.gov (United States)

    Foarde, K K; VanOsdell, D W; Menetrez, M Y

    2001-08-01

    Recent experiments confirm field experience that duct cleaning alone may not provide adequate protection from regrowth of fungal contamination on fiberglass duct liner (FGDL). Current recommendations for remediation of fungally contaminated fiberglass duct materials specify complete removal of the materials. But removal of contaminated materials can be extremely expensive. Therefore, a common practice in the duct-cleaning industry is the postcleaning use of antimicrobial surface coatings with the implication that they may contain or limit regrowth. Little information is available on the efficacy of these treatments. This paper describes a study to evaluate whether three commercially available antimicrobial coatings, placed on a cleaned surface that 1 year previously had been actively growing microorganisms, would be able to prevent regrowth. The three coatings contained different active antimicrobial compounds. All three of the coatings were designed for use on heating, ventilation, and air conditioning (HVAC) system components or interior surfaces of lined and unlined duct systems. Coating I was a polyacrylate copolymer containing zinc oxide and borates. Coating II was an acrylic coating containing decabromodiphenyl oxide and antimony trioxide. Coating III was an acrylic primer containing a phosphated quaternary amine complex. The study included field and laboratory assessments. The three treatments were evaluated in an uncontrolled field setting in an actual duct system. The laboratory study broadened the field study to include a range of humidities under controlled conditions. Both static and dynamic chamber laboratory experiments were performed. The results showed that two of the three antimicrobial coatings limited the regrowth of fungal contamination, at least in the short term (the 3-month time span of the study); the third did not. Before use in the field, testing of the efficacy of antimicrobial coatings under realistic use conditions is recommended

  2. HVAC controls: Operation and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Gupton, G.W. Jr.

    1987-01-01

    The introductory chapters review HVAC system processes and equipment, control system types and equipment, and equipment-to-control interactions. The succeeding chapters cover specific control systems functions, including electrical interlock and motor starting, electrical and electronic control system diagrams, pneumatic control system diagrams, air supply to pneumatic control systems, and control system maintenance.

  3. The role of ventilation and HVAC systems for human health in nonindustrial indoor environments. A supplementary review by EUROVEN group

    DEFF Research Database (Denmark)

    Wargocki, Pawel; Sundell, Jan; Bischof, W.;

    2002-01-01

    with increased productivity, and that air-conditioning systems may increase the risk of sick building syndrome (SBS) symptoms. Taking these findings into account, the group has elaborated 35 hypotheses on the role of ventilation ahd HVAC systems in nonindustrial indoor environments with regard to human health......A continuation of the earlier work of the multidisciplinary group of European scientists, EUROVEN, is presented. The group has previously concluded that increased ventilation rates in indoor nonindustrial environments are strongly associated with improved comfort and health and may be associated...... of ventilation and air-conditioning systems, as well as their intermittent operation, may be potential reasons for health problems of people staying indoors....

  4. Fault ride-through and grid support of permanent magnet synchronous generator-based wind farms with HVAC and VSC-HVDC transmission systems

    DEFF Research Database (Denmark)

    Liu, Hongzhi; Chen, Zhe

    2012-01-01

    This paper describes fault ride-through and grid support of offshore wind farms based on permanent magnet synchronous generator (PMSG) wind turbines connected to the onshore AC network through two alternative transmission systems: high voltage AC (HVAC) or high voltage DC (HVDC) based on voltage...... source converters (VSC). The proposed configurations of the PMSG-based offshore wind farm and VSC-based HVDC are given as well as their control strategies under both steady state and fault state. The PMSG-based offshore wind farm is integrated into a test power transmission system via either HVAC or VSC-HVDC...

  5. Evaluating the potential efficacy of three antifungal sealants of duct liner and galvanized steel as used in HVAC systems.

    Science.gov (United States)

    Foarde, Karin K; Menetrez, M Y

    2002-07-01

    Current recommendations for remediation of fiberglass duct materials contaminated with fungi specify complete removal, which can be extremely expensive, but in-place duct cleaning may not provide adequate protection from regrowth of fungal contamination. Therefore, a common practice in the duct-cleaning industry is the postcleaning use of antifungal surface coatings with the implication that they may contain or limit regrowth. However, even the proper use of these products has generally been discouraged because little research has been conducted on the effectiveness of most products as used in heating, ventilating, and air-conditioning (HVAC) systems. Three different coatings were evaluated on fiberglass duct liner (FGDL). Two of the three coatings were able to limit growth in the 3-month study; the third did not. One of the coatings that was able to limit growth was further evaluated in a comparison of FGDL or galvanized steel (GS) under conditions that mimicked their use in HVAC systems. The results showed that both moderately soiled and heavily soiled uncoated FGDL and GS duct material can support fungal growth, but that GS duct material was more readily cleaned. The use of an antifungal coating helped limit, but did not fully contain, regrowth on FGDL. No regrowth was detected on the coated GS.

  6. Fumigation of a laboratory-scale HVAC system with hydrogen peroxide for decontamination following a biological contamination incident.

    Science.gov (United States)

    Meyer, K M; Calfee, M W; Wood, J P; Mickelsen, L; Attwood, B; Clayton, M; Touati, A; Delafield, R

    2014-03-01

    To evaluate hydrogen peroxide vapour (H2 O2 ) for its ability to inactivate Bacillus spores within a laboratory-scale heating, ventilation and air-conditioning (HVAC) duct system. Experiments were conducted in a closed-loop duct system, constructed of either internally lined or unlined galvanized metal. Bacterial spores were aerosol-deposited onto 18-mm-diameter test material coupons and strategically placed at several locations within the duct environment. Various concentrations of H2 O2 and exposure times were evaluated to determine the sporicidal efficacy and minimum exposure needed for decontamination. For the unlined duct, high variability was observed in the recovery of spores between sample locations, likely due to complex, unpredictable flow patterns within the ducts. In comparison, the lined duct exhibited a significant desorption of the H2 O2 following the fumigant dwell period and thus resulted in complete decontamination at all sampling locations. These findings suggest that decontamination of Bacillus spore-contaminated unlined HVAC ducts by hydrogen peroxide fumigation may require more stringent conditions (higher concentrations, longer dwell duration) than internally insulated ductwork. These data may help emergency responders when developing remediation plans during building decontamination. © 2013 The Society for Applied Microbiology This article has been contributed to by US Government employees and their work is in the public domain in the USA.

  7. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  8. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Liping; Hong, Tianzhen

    2013-01-01

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct

  9. Comparison of Energy Performance of Different HVAC Systems for a Typical Office Room and a Typical Classroom

    DEFF Research Database (Denmark)

    Yu, Tao; Heiselberg, Per; Pomianowski, Michal Zbigniew

    This report is part of the work performed under the project “Natural cooling and Ventilation through Diffuse Ceiling Supply and Thermally Activated Building Constructions”. In this project, a new system solution combining natural ventilation with diffuse ceiling inlet and thermally activated...... the energy consumption for buildings with cooling demand in cold seasons. In this way, the building system can operate at a very low energy use all the year round. The main purpose of this task is to investigate the energy performance of different HVAC systems used in the office room and the classroom......, and find the potential of energy saving for the proposed new system solution. In this report, a typical room is selected according to the previous study, but the occupation is different for the purpose of the office and the classroom. Energy performance of these two types of room under different internal...

  10. Evaluation of commercially available techniques and development of simplified methods for measuring grille airflows in HVAC systems

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Iain S.; Wray, Craig P.; Guillot, Cyril; Masson, S.

    2003-08-01

    In this report, we discuss the accuracy of flow hoods for residential applications, based on laboratory tests and field studies. The results indicate that commercially available hoods are often inadequate to measure flows in residential systems, and that there can be a wide range of performance between different flow hoods. The errors are due to poor calibrations, sensitivity of existing hoods to grille flow non-uniformities, and flow changes from added flow resistance. We also evaluated several simple techniques for measuring register airflows that could be adopted by the HVAC industry and homeowners as simple diagnostics that are often as accurate as commercially available devices. Our test results also show that current calibration procedures for flow hoods do not account for field application problems. As a result, organizations such as ASHRAE or ASTM need to develop a new standard for flow hood calibration, along with a new measurement standard to address field use of flow hoods.

  11. Characterization and control of the microbial community affiliated with copper or aluminum heat exchangers of HVAC systems.

    Science.gov (United States)

    Schmidt, Michael G; Attaway, Hubert H; Terzieva, Silva; Marshall, Anna; Steed, Lisa L; Salzberg, Deborah; Hamoodi, Hameed A; Khan, Jamil A; Feigley, Charles E; Michels, Harold T

    2012-08-01

    Microbial growth in heating ventilation and air-conditioning (HVAC) systems with the subsequent contamination of indoor air is of increasing concern. Microbes and the subsequent biofilms grow easily within heat exchangers. A comparative study where heat exchangers fabricated from antimicrobial copper were evaluated for their ability to limit microbial growth was conducted using a full-scale HVAC system under conditions of normal flow rates using single-pass outside air. Resident bacterial and fungal populations were quantitatively assessed by removing triplicate sets of coupons from each exchanger commencing the fourth week after their installation for the next 30 weeks. The intrinsic biofilm associated with each coupon was extracted and characterized using selective and differential media. The predominant organisms isolated from aluminum exchangers were species of Methylobacterium of which at least three colony morphologies and 11 distinct PFGE patterns we found; of the few bacteria isolated from the copper exchangers, the majority were species of Bacillus. The concentrations and type of bacteria recovered from the control, aluminum, exchangers were found to be dependent on the type of plating media used and were 11,411-47,257 CFU cm(-2) per coupon surface. The concentration of fungi was found to average 378 CFU cm(-2). Significantly lower concentrations of bacteria, 3 CFU cm(-2), and fungi, 1 CFU cm(-2), were recovered from copper exchangers regardless of the plating media used. Commonly used aluminum heat exchangers developed stable, mixed, bacterial/fungal biofilms in excess of 47,000 organisms per cm(2) within 4 weeks of operation, whereas the antimicrobial properties of metallic copper were able to limit the microbial load affiliated with the copper heat exchangers to levels 99.97 % lower during the same time period.

  12. HVAC Trials.

    Science.gov (United States)

    Greim, Clifton W.; D'Angelo, David

    1999-01-01

    Explains how commissioning can help to ensure that all components in a new heating, ventilation, and air conditioning system will work together as designed. Bowdoin College's experience with commissioning is highlighted. (GR)

  13. HVAC Trials.

    Science.gov (United States)

    Greim, Clifton W.; D'Angelo, David

    1999-01-01

    Explains how commissioning can help to ensure that all components in a new heating, ventilation, and air conditioning system will work together as designed. Bowdoin College's experience with commissioning is highlighted. (GR)

  14. Fermilab Central Computing Facility: Energy conservation report and mechanical systems design optimization and cost analysis study

    Energy Technology Data Exchange (ETDEWEB)

    Krstulovich, S.F.

    1986-11-12

    This report is developed as part of the Fermilab Central Computing Facility Project Title II Design Documentation Update under the provisions of DOE Document 6430.1, Chapter XIII-21, Section 14, paragraph a. As such, it concentrates primarily on HVAC mechanical systems design optimization and cost analysis and should be considered as a supplement to the Title I Design Report date March 1986 wherein energy related issues are discussed pertaining to building envelope and orientation as well as electrical systems design.

  15. Draft PRN 2006-A: Use of Antimicrobial Pesticide Products in Heating, Ventilation, Air Conditioning and Refrigeration Systems (HVAC&R)

    Science.gov (United States)

    This draft notice provides guidance to registrants of EPA-registered antimicrobial products whose labels bear general directions related to hard, non-porous or porous surfaces, but which are not but which are not specifically registered for HVAC uses.

  16. Assessment of organic compound exposures, thermal comfort parameters, and HVAC system-driven air exchange rates in public school portable classrooms in California

    Energy Technology Data Exchange (ETDEWEB)

    Shendell, Derek Garth [Univ. of California, Los Angeles, CA (United States)

    2003-01-01

    The prevalence of prefabricated, portable classrooms (portables, relocatables, RCs) has increased due to class size reduction initiatives and limited resources. Classroom mechanical wall-mount heating, ventilation, and air conditioning (HVAC) systems may function improperly or not be maintained; lower ventilation rates may impact indoor air and environmental quality (IEQ). Materials in portables may off-gas volatile organic compounds (VOCs), including formaldehyde, as a function of age, temperature, and humidity. For a pilot study, public K-12 schools located in or serving target areas within five Los Angeles County communities were identified. In two communities where school districts (SD) consented, 1-3 randomly selected portables, one newer and one older, and one main building control classroom from each participating school were included. Sampling was conducted over a five-day school week in the cooling and heating seasons, or repeated twice in the cooling season. Measurements included passive samplers for VOCs, formaldehyde and acetaldehyde, and air exchange rate (AER) calculation; indoor air temperature and humidity; technician walk-through surveys; an interview questionnaire above HVAC system operation and maintenance (O and M). For an intervention study evaluating advanced HVAC technologies in comparison to the common conventional technology, and materials for source reduction of VOCs, four RC were manufactured and located in pairs at two schools in two recruited Northern California SD in different climate zones. RCs were built with the two HVAC systems, cabinetry and conduit for monitoring equipment, and standard or advanced interior finish materials. Each RC was its own control in a case-crossover design--HVAC systems alternately operated for 1-2 week intervals in the 2001-02 school year, with IEQ monitoring including aldehyde and indoor air temperature and humidity data. Measured classroom AER were low, formaldehyde concentrations were below the state

  17. Parametric analysis of air–water heat recovery concept applied to HVAC systems: Effect of mass flow rates

    OpenAIRE

    Mohamad Ramadan; Mostafa Gad El Rab; Mahmoud Khaled

    2015-01-01

    In the last three decades, the world has experienced enormous increases in energy and fuel consumption as a consequence of the economic and population growth. This causes renewable energy and energy recovery to become a requirement in building designs rather than option. The present work concerns a coupling between energy recovery and Heating, Ventilating and Air Conditioning HVAC domains and aims to apply heat recovery concepts to HVAC applications working on refrigeration cycles. It particu...

  18. Fault Diagnosis in HVAC Chillers

    Science.gov (United States)

    Choi, Kihoon; Namuru, Setu M.; Azam, Mohammad S.; Luo, Jianhui; Pattipati, Krishna R.; Patterson-Hine, Ann

    2005-01-01

    Modern buildings are being equipped with increasingly sophisticated power and control systems with substantial capabilities for monitoring and controlling the amenities. Operational problems associated with heating, ventilation, and air-conditioning (HVAC) systems plague many commercial buildings, often the result of degraded equipment, failed sensors, improper installation, poor maintenance, and improperly implemented controls. Most existing HVAC fault-diagnostic schemes are based on analytical models and knowledge bases. These schemes are adequate for generic systems. However, real-world systems significantly differ from the generic ones and necessitate modifications of the models and/or customization of the standard knowledge bases, which can be labor intensive. Data-driven techniques for fault detection and isolation (FDI) have a close relationship with pattern recognition, wherein one seeks to categorize the input-output data into normal or faulty classes. Owing to the simplicity and adaptability, customization of a data-driven FDI approach does not require in-depth knowledge of the HVAC system. It enables the building system operators to improve energy efficiency and maintain the desired comfort level at a reduced cost. In this article, we consider a data-driven approach for FDI of chillers in HVAC systems. To diagnose the faults of interest in the chiller, we employ multiway dynamic principal component analysis (MPCA), multiway partial least squares (MPLS), and support vector machines (SVMs). The simulation of a chiller under various fault conditions is conducted using a standard chiller simulator from the American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE). We validated our FDI scheme using experimental data obtained from different types of chiller faults.

  19. Fault Diagnosis in HVAC Chillers

    Science.gov (United States)

    Choi, Kihoon; Namuru, Setu M.; Azam, Mohammad S.; Luo, Jianhui; Pattipati, Krishna R.; Patterson-Hine, Ann

    2005-01-01

    Modern buildings are being equipped with increasingly sophisticated power and control systems with substantial capabilities for monitoring and controlling the amenities. Operational problems associated with heating, ventilation, and air-conditioning (HVAC) systems plague many commercial buildings, often the result of degraded equipment, failed sensors, improper installation, poor maintenance, and improperly implemented controls. Most existing HVAC fault-diagnostic schemes are based on analytical models and knowledge bases. These schemes are adequate for generic systems. However, real-world systems significantly differ from the generic ones and necessitate modifications of the models and/or customization of the standard knowledge bases, which can be labor intensive. Data-driven techniques for fault detection and isolation (FDI) have a close relationship with pattern recognition, wherein one seeks to categorize the input-output data into normal or faulty classes. Owing to the simplicity and adaptability, customization of a data-driven FDI approach does not require in-depth knowledge of the HVAC system. It enables the building system operators to improve energy efficiency and maintain the desired comfort level at a reduced cost. In this article, we consider a data-driven approach for FDI of chillers in HVAC systems. To diagnose the faults of interest in the chiller, we employ multiway dynamic principal component analysis (MPCA), multiway partial least squares (MPLS), and support vector machines (SVMs). The simulation of a chiller under various fault conditions is conducted using a standard chiller simulator from the American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE). We validated our FDI scheme using experimental data obtained from different types of chiller faults.

  20. Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

    CERN Document Server

    2012-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

  1. Implementation of PFC (Predictive Functional Control) in a PLC (Programmable Logic Controller) for a HVAC (Heating, Ventilation and Air Conditioning) system

    Science.gov (United States)

    Kreutz, M.; Richalet, J.; Mocha, K.; Haber, R.

    2014-12-01

    HVAC systems of industrial buildings consume a lot of energy. Therefore it is important to know the performance of these systems and strategies to optimize the hardware and the control. Tackling the temperature control of the HVAC system promises quick savings by tuning the control within specified tolerance limits, which mostly can be done by low investment. This paper mainly deals with the implementation strategy of a new controller in a PLC using the predictive functional control for temperature control. The different stages of the implementation from the simulation over the SCL code till to the real-time operation are presented. A bumpless switch between the PI(D) and the PFC control was realized, as well.

  2. HVAC; Heating, Ventilation, Air Conditioning - Aerosol Duct Sealant

    Science.gov (United States)

    2016-09-01

    Approved for public release: distribution unlimited TDS-NAVFAC-EXWC-PW-1603 Sep 2016 HVAC ; Heating, Ventilation, Air Conditioning - Aerosol...energy consumption, depending on the HVAC system type and the location of the ducts that were sealed. The cost effectiveness of the technology is...Although several studies have been done on the effectiveness of sealing leaky HVAC ductwork with aerosol duct sealant, few studies have been done on

  3. LSSVM predictive control for HVAC system with PSO algorithm%基于PSO算法的HVAC系统LSSVM预测控制

    Institute of Scientific and Technical Information of China (English)

    邹木春; 龙文

    2012-01-01

    For the system of heating, ventilating and air-conditioning (HVAC), a nonlinear predictive control algorithm based on particle swarm optimization (PSO) and least square support vector machine (LSSVM) was proposed. It utilizes LSSVM to estimate the HVAC system model and forecast the output value, reducing the error in output feedback and error correction. A new weighted predictive control performance index is formulated. The optimal control values of the nonlinear system are obtained by the rolling optimization of PSO algorithm. An optimal control system is designed to control a HVAC system; simulation results show that the proposed nonlinear predictive control algorithm is effective.%针对暖通空调(HVAC)系统,提出一种基于粒子群优化(PSO)算法和最小二乘支持向量机(LSSVM)的预测控制方法.该方法利用LSSVM建立HVAC系统预测模型并预测系统的输出值,引入输出反馈和偏差校正以克服模型失配等因素引起的预测误差,以此构造加权预测控制性能指标.由PSO算法滚动优化得到系统的最优控制量.利用该控制方法对一个HVAC系统进行仿真实验,结果表明该方法具有较好的控制效果.

  4. Multiyear Plan for Validation of EnergyPlus Multi-Zone HVAC System Modeling using ORNL's Flexible Research Platform

    Energy Technology Data Exchange (ETDEWEB)

    Im, Piljae [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bhandari, Mahabir S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); New, Joshua Ryan [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-10-01

    This document describes the Oak Ridge National Laboratory (ORNL) multiyear experimental plan for validation and uncertainty characterization of whole-building energy simulation for a multi-zone research facility using a traditional rooftop unit (RTU) as a baseline heating, ventilating, and air conditioning (HVAC) system. The project’s overarching objective is to increase the accuracy of energy simulation tools by enabling empirical validation of key inputs and algorithms. Doing so is required to inform the design of increasingly integrated building systems and to enable accountability for performance gaps between design and operation of a building. The project will produce documented data sets that can be used to validate key functionality in different energy simulation tools and to identify errors and inadequate assumptions in simulation engines so that developers can correct them. ASHRAE Standard 140, Method of Test for the Evaluation of Building Energy Analysis Computer Programs (ASHRAE 2004), currently consists primarily of tests to compare different simulation programs with one another. This project will generate sets of measured data to enable empirical validation, incorporate these test data sets in an extended version of Standard 140, and apply these tests to the Department of Energy’s (DOE) EnergyPlus software (EnergyPlus 2016) to initiate the correction of any significant deficiencies. The fitness-for-purpose of the key algorithms in EnergyPlus will be established and demonstrated, and vendors of other simulation programs will be able to demonstrate the validity of their products. The data set will be equally applicable to validation of other simulation engines as well.

  5. Wireless Infrastructure for Performing Monitoring, Diagnostics, and Control HVAC and Other Energy-Using Systems in Small Commercial Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Patrick O' Neill

    2009-06-30

    This project focused on developing a low-cost wireless infrastructure for monitoring, diagnosing, and controlling building systems and equipment. End users receive information via the Internet and need only a web browser and Internet connection. The system used wireless communications for: (1) collecting data centrally on site from many wireless sensors installed on building equipment, (2) transmitting control signals to actuators and (3) transmitting data to an offsite network operations center where it is processed and made available to clients on the Web (see Figure 1). Although this wireless infrastructure can be applied to any building system, it was tested on two representative applications: (1) monitoring and diagnostics for packaged rooftop HVAC units used widely on small commercial buildings and (2) continuous diagnosis and control of scheduling errors such as lights and equipment left on during unoccupied hours. This project developed a generic infrastructure for performance monitoring, diagnostics, and control, applicable to a broad range of building systems and equipment, but targeted specifically to small to medium commercial buildings (an underserved market segment). The proposed solution is based on two wireless technologies. The first, wireless telemetry, is used for cell phones and paging and is reliable and widely available. This risk proved to be easily managed during the project. The second technology is on-site wireless communication for acquiring data from sensors and transmitting control signals. The technology must enable communication with many nodes, overcome physical obstructions, operate in environments with other electrical equipment, support operation with on-board power (instead of line power) for some applications, operate at low transmission power in license-free radio bands, and be low cost. We proposed wireless mesh networking to meet these needs. This technology is relatively new and has been applied only in research and tests

  6. Power Systems Development Facility

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2009-01-31

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, has routinely demonstrated gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This final report summarizes the results of the technology development work conducted at the PSDF through January 31, 2009. Twenty-one major gasification test campaigns were completed, for a total of more than 11,000 hours of gasification operation. This operational experience has led to significant advancements in gasification technologies.

  7. Legionellosis prevention in building water and HVAC systems a practical guide for design, operation and maintenance to minimize the risk

    CERN Document Server

    Joppolo, Cesare Maria; Pitera, Luca Alberto; Angermann, Jean Pierre; Izard, Mark

    2013-01-01

    This Guidebook is a practical guide for design, operation and maintenance to minimize the risk of legionellosis in building water and HVAC systmes. It is devided into several themes such as: Air conditioning of the air (by water – humidification), Production of hot water for washing (fundamentally but not only hot water for washing) and Evaporative cooling tower.

  8. 暖通空调系统故障诊断技术及应用%The Fault Diagnosis and Application in HVAC Facility Management

    Institute of Scientific and Technical Information of China (English)

    郑洁; 周玉礼; 李兴友

    2003-01-01

    本文阐述了暖通空调(HVAC)系统故障诊断的基本方法和技术,简要地介绍了其故障诊断的研究现状及应用情况,对HVAC系统故障进行了分类,并对故障特征进行了归纳.文中提出了HVAC系统故障诊断方案及诊断模型,并结合工程实例进行了分析.

  9. Computer Review Can Cut HVAC Energy Use

    Science.gov (United States)

    McClure, Charles J. R.

    1974-01-01

    A computerized review of construction bidding documents, usually done by a consulting engineer, can reveal how much money it will cost to operate various alternative types of HVAC equipment over a school's lifetime. The review should include a computerized load calculation, energy systems flow diagram, control system analysis, and a computerized…

  10. Computer Review Can Cut HVAC Energy Use

    Science.gov (United States)

    McClure, Charles J. R.

    1974-01-01

    A computerized review of construction bidding documents, usually done by a consulting engineer, can reveal how much money it will cost to operate various alternative types of HVAC equipment over a school's lifetime. The review should include a computerized load calculation, energy systems flow diagram, control system analysis, and a computerized…

  11. Design Optimization of Heat Wheels for Energy Recovery in HVAC Systems

    Directory of Open Access Journals (Sweden)

    Stefano De Antonellis

    2014-11-01

    Full Text Available Air to air heat exchangers play a crucial role in mechanical ventilation equipment, due to the potential primary energy savings both in case of refurbishment of existing buildings or in case of new ones. In particular, interest in heat wheels is increasing due to their low pressure drop and high effectiveness. In this paper a detailed optimization of design parameters of heat wheels is performed in order to maximize sensible effectiveness and to minimize pressure drop. The analysis is carried out through a one dimensional lumped parameters heat wheel model, which solves heat and mass transfer equations, and through appropriate correlations to estimate pressure drop. Simulation results have been compared with experimental data of a heat wheel tested in specific facilities, and good agreement is attained. The device optimization is performed through the variation of main design parameters, such as heat wheel length, channel base, height and thickness and for different operating conditions, namely the air face velocity and the revolution speed. It is shown that the best configurations are achieved with small channel thickness and, depending on the required sensible effectiveness, with appropriate values of wheel length and channel base and height.

  12. Geothermal HVAC Systems - A Business Case Analysis for Net Zero Plus

    Science.gov (United States)

    2009-03-01

    During the summer (or warm months), the system cools the building by pulling heat from the building , carrying it through the system and placing it in the...system and into the building or structure, Figure 4. Figure 3. The flow of energy during the Summer or warmer months (From Weigand, 2008...lives by reducing the need for traditional fuel transport. ( NetZero Plus – Joint Capability Technology Demonstration, March 2008) 13 C. THE

  13. Power Systems Development Facility

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-07-01

    This report discusses Test Campaign TC12 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (SW) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC12 began on May 16, 2003, with the startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until May 24, 2003, when a scheduled outage occurred to allow maintenance crews to install the fuel cell test unit and modify the gas clean-up system. On June 18, 2003, the test run resumed when operations relit the start-up burner, and testing continued until the scheduled end of the run on July 14, 2003. TC12 had a total of 733 hours using Powder River Basin (PRB) subbituminous coal. Over the course of the entire test run, gasifier temperatures varied between 1,675 and 1,850 F at pressures from 130 to 210 psig.

  14. Power Systems Development Facility

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-07-01

    This report discusses Test Campaign TC12 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (SW) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC12 began on May 16, 2003, with the startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until May 24, 2003, when a scheduled outage occurred to allow maintenance crews to install the fuel cell test unit and modify the gas clean-up system. On June 18, 2003, the test run resumed when operations relit the start-up burner, and testing continued until the scheduled end of the run on July 14, 2003. TC12 had a total of 733 hours using Powder River Basin (PRB) subbituminous coal. Over the course of the entire test run, gasifier temperatures varied between 1,675 and 1,850 F at pressures from 130 to 210 psig.

  15. A Novel Application of Thermoelectric Modules in an HVAC System Under Cold Climate Operation

    Science.gov (United States)

    Okuma, Toru; Radermacher, Reinhard; Hwang, Yunho

    2012-06-01

    A vapor compression cycle (VCC) with integrated thermoelectric (TE) modules to boost the heating capacity of the system in an energy-efficient way, especially for cold climate operation, is suggested in this paper. While a baseline heat pump (HP) cycle absorbs heat from a source through an evaporator, the proposed system utilizes TE modules as an intermediate (or third) stage of an otherwise two-stage vapor compression system with a vapor injection compressor. This increases the overall system efficiency and augments the system capacity through the high coefficient of performance (COP) of the TE for small temperature lift conditions. To demonstrate the concept, a prototype refrigerant-to-solid (TE) heat exchanger, consisting of TE modules and microchannel flat tubes, was designed and fabricated so that the whole system could realize an additional 1 kW of heating capacity compared with the baseline system. The TE heat exchanger was integrated into a residential HP unit that uses R-410A as a refrigerant, and the system was tested in a laboratory under the severe condition of -17.8°C, in order to investigate the capacity improvement and the overall COP. Finally, an application of this technique in an automotive heating, ventilating, and air-conditioning system with HFC134a working fluid has been studied for the purpose of providing supplemental heating for electric vehicles and hybrid electric vehicles by establishing a detailed simulation model of a HP system with the TE heat exchanger. Both the laboratory test and the calculation study show that a VCC with integrated TE modules has both reasonable efficiency and increased heating capacity.

  16. Power Systems Development Facility

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2004-04-30

    This report discusses Test Campaign TC15 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Power Generation, Inc. (SPG) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC15 began on April 19, 2004, with the startup of the main air compressor and the lighting of the gasifier startup burner. The Transport Gasifier was shutdown on April 29, 2004, accumulating 200 hours of operation using Powder River Basin (PRB) subbituminous coal. About 91 hours of the test run occurred during oxygen-blown operations. Another 6 hours of the test run was in enriched-air mode. The remainder of the test run, approximately 103 hours, took place during air-blown operations. The highest operating temperature in the gasifier mixing zone mostly varied from 1,800 to 1,850 F. The gasifier exit pressure ran between 200 and 230 psig during air-blown operations and between 110 and 150 psig in oxygen-enhanced air operations.

  17. An emulator for testing HVAC-control and energy management systems

    Science.gov (United States)

    Laitila, Paeivi; Kaerki, Satu; Piira, Kalevi; Katajisto, Katri; Kohonen, Reijo

    1992-02-01

    A technical description of an emulator for control and energy systems is presented. The emulator is made up of both physical components and numerical models programmed for a computer. In the emulator, the building and its internal and external heart and moisture loads are numerical models in all cases, if they are included in the system under study. The emulator can be used to study control equipment and energy management systems as well as other devices such as heat producing equipment. This is facilitated by the emulator's physical test equipment, which comprises an exchangeable heat producing device, two separate cooling water systems and their heat exchangers, and the mains water supply. At the heart of the emulator's ADP hardware are two microcomputers linked by an Ethernet line. The TRNSYS simulation software has been installed in one of the microcomputers, and the GENESIS process control program in the other. GENESIS is not needed for running the emulation. The process interface equipment and simulation software are connected to one another via their RS-232 serial ports. The performance functionality of the emulator was tested by investigating the control of an air conditioning system with a commercial controller (substation).

  18. Increasing energy efficiency of HVAC systems of buildings using phase change material

    Directory of Open Access Journals (Sweden)

    Lee Chusak, Jared Daiber, Ramesh Agarwal

    2012-01-01

    Full Text Available Using Computational Fluid Dynamics (CFD, four different cooling systems used in contemporary office environments are modeled to compare energy consumption and thermal comfort levels. Incorporating convection and radiation technologies, full-scale models of an office room compare energy efficiency of (a an all-air overhead system, (b a combined all-air overhead and hydronic radiant system (chilled ceiling, (c an all-air raised floor system (displacement ventilation, and (d a combined displacement ventilation with a chilled ceiling. The computational domain for each model consists of one temperature varying wall (simulating the temperature of the exterior wall of the building during a 24-hour period and adiabatic conditions for the remaining walls, floor, and ceiling (simulating interior walls of the room. Two sets of computations are conducted. The first set considers a glass window and plastic shade configuration for the exterior wall. The second set of computations includes a phase change material layer between the glass window and the plastic shade. Results show substantial energy savings can be accrued using the displacement ventilation and especially the displacement ventilation with a chilled ceiling over the conventional overhead mixing ventilation system. The results also show that the addition of a PCM layer to the exterior wall can significantly decrease the cooling energy requirements.

  19. Increasing energy efficiency of HVAC systems of buildings using phase change material

    Energy Technology Data Exchange (ETDEWEB)

    Chusak, Lee; Daiber, Jared; Agarwal, Ramesh [Department of Mechanical Engineering and Materials Science, Washington University in St. Louis, St. Louis, MO 63130 (United States)

    2012-07-01

    Using Computational Fluid Dynamics (CFD), four different cooling systems used in contemporary office environments are modeled to compare energy consumption and thermal comfort levels. Incorporating convection and radiation technologies, full-scale models of an office room compare energy efficiency of (a) an all-air overhead system, (b) a combined all-air overhead and hydronic radiant system (chilled ceiling), (c) an all-air raised floor system (displacement ventilation), and (d) a combined displacement ventilation with a chilled ceiling. The computational domain for each model consists of one temperature varying wall (simulating the temperature of the exterior wall of the building during a 24-hour period) and adiabatic conditions for the remaining walls, floor, and ceiling (simulating interior walls of the room). Two sets of computations are conducted. The first set considers a glass window and plastic shade configuration for the exterior wall. The second set of computations includes a phase change material layer between the glass window and the plastic shade. Results show substantial energy savings can be accrued using the displacement ventilation and especially the displacement ventilation with a chilled ceiling over the conventional overhead mixing ventilation system. The results also show that the addition of a PCM layer to the exterior wall can significantly decrease the cooling energy requirements.

  20. A PID de-tuned method for multivariable systems, applied for HVAC plant

    Science.gov (United States)

    Ghazali, A. B.

    2015-09-01

    A simple yet effective de-tuning of PID parameters for multivariable applications has been described. Although the method is felt to have wider application it is simulated in a 3-input/ 2-output building energy management system (BEMS) with known plant dynamics. The controller performances such as the sum output squared error and total energy consumption when the system is at steady state conditions are studied. This tuning methodology can also be extended to reduce the number of PID controllers as well as the control inputs for specified output references that are necessary for effective results, i.e. with good regulation performances being maintained.

  1. Power System Technical Performance Issues Related to the Application of Long HVAC Cables

    DEFF Research Database (Denmark)

    Bak, Claus Leth

    The aim of this TB is to serve as a practical guide for preparing models and performing studies necessary during the assessment of the technical performance of HV/EHV systems with a large share of (long) AC cables. The brochure follows all phases of planning and analysis of a typical underground...

  2. A new design guideline for the heating and cooling curve in AHU units of HVAC systems

    NARCIS (Netherlands)

    Elkhuizen, P.A.; Peitsman, H.C.; Wienk, W.J.

    2003-01-01

    New Dutch office buildings are built under strict energy efficient legislation and are well equipped with insulation, condensing boilers, heat recovery systems, and so on. Despite this, many buildings do not have good energy efficiency and also do not meet comfort requirements. This has led to a lar

  3. Power System Technical Performance Issues Related to the Application of Long HVAC Cables

    DEFF Research Database (Denmark)

    Bak, Claus Leth

    The aim of this TB is to serve as a practical guide for preparing models and performing studies necessary during the assessment of the technical performance of HV/EHV systems with a large share of (long) AC cables. The brochure follows all phases of planning and analysis of a typical underground ...

  4. Assessing the potential of residential HVAC systems for demand-side management

    NARCIS (Netherlands)

    van der Klauw, Thijs; Hoogsteen, Gerwin; Gerards, Marco Egbertus Theodorus; Hurink, Johann L.; Feng, Xianyong; Hebner, Robert E.

    This paper investigates the potential of residential heating, ventilation and air conditioning systems to contribute to dynamic demand-side management. Thermal models for seven houses in Austin, Texas are developed with the goal of using them in a planning based demand-side management methodology.

  5. A new design guideline for the heating and cooling curve in AHU units of HVAC systems

    NARCIS (Netherlands)

    Elkhuizen, P.A.; Peitsman, H.C.; Wienk, W.J.

    2003-01-01

    New Dutch office buildings are built under strict energy efficient legislation and are well equipped with insulation, condensing boilers, heat recovery systems, and so on. Despite this, many buildings do not have good energy efficiency and also do not meet comfort requirements. This has led to a

  6. Wireless Infrastructure for Performing Monitoring, Diagnostics, and Control HVAC and Other Energy-Using Systems in Small Commercial Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Patrick O' Neill

    2009-06-30

    This project focused on developing a low-cost wireless infrastructure for monitoring, diagnosing, and controlling building systems and equipment. End users receive information via the Internet and need only a web browser and Internet connection. The system used wireless communications for: (1) collecting data centrally on site from many wireless sensors installed on building equipment, (2) transmitting control signals to actuators and (3) transmitting data to an offsite network operations center where it is processed and made available to clients on the Web (see Figure 1). Although this wireless infrastructure can be applied to any building system, it was tested on two representative applications: (1) monitoring and diagnostics for packaged rooftop HVAC units used widely on small commercial buildings and (2) continuous diagnosis and control of scheduling errors such as lights and equipment left on during unoccupied hours. This project developed a generic infrastructure for performance monitoring, diagnostics, and control, applicable to a broad range of building systems and equipment, but targeted specifically to small to medium commercial buildings (an underserved market segment). The proposed solution is based on two wireless technologies. The first, wireless telemetry, is used for cell phones and paging and is reliable and widely available. This risk proved to be easily managed during the project. The second technology is on-site wireless communication for acquiring data from sensors and transmitting control signals. The technology must enable communication with many nodes, overcome physical obstructions, operate in environments with other electrical equipment, support operation with on-board power (instead of line power) for some applications, operate at low transmission power in license-free radio bands, and be low cost. We proposed wireless mesh networking to meet these needs. This technology is relatively new and has been applied only in research and tests

  7. An Integrated FDD System for HVAC&R Based on Virtual Sensors

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woohyun

    2017-01-22

    According to the U.S Department of Energy, space heating, ventilation and air conditioning system account for 40% of residential primary energy use and for 30% of primary energy use in commercial buildings. A study released by the Energy Information Administration indicated that packaged air conditioners are widely used in 46% of all commercial buildings in the U.S. This study indicates that the annual cooling energy consumption related to the packaged air conditioner is about 160 trillion Btus. Therefore, an automated FDD system that can automatically detect and diagnose faults and evaluate fault impacts has the potential for improving energy efficiency along with reducing service costs and comfort complaints. The primary bottlenecks to diagnostic implementation in the field are the high initial costs of additional sensors. To prevent those limitations, virtual sensors with low cost measurements and simple models are developed to estimate quantities that would be expensive and or difficult to measure directly. The use of virtual sensors can reduce costs compared to the use of real sensors and provide additional information for economic assessment. The virtual sensor can be embedded in a permanently installed control or monitoring system and continuous monitoring potentially leads to early detection of faults. The virtual sensors of individual equipment components can be integrated to estimate overall diagnostic information using the output of each virtual sensor.

  8. POWER SYSTEMS DEVELOPMENT FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2002-11-01

    This report discusses test campaign GCT4 of the Kellogg Brown & Root, Inc. (KBR) transport reactor train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The transport reactor is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using one of two possible particulate control devices (PCDs). The transport reactor was operated as a pressurized gasifier during GCT4. GCT4 was planned as a 250-hour test run to continue characterization of the transport reactor using a blend of several Powder River Basin (PRB) coals and Bucyrus limestone from Ohio. The primary test objectives were: Operational Stability--Characterize reactor loop and PCD operations with short-term tests by varying coal-feed rate, air/coal ratio, riser velocity, solids-circulation rate, system pressure, and air distribution. Secondary objectives included the following: Reactor Operations--Study the devolatilization and tar cracking effects from transient conditions during transition from start-up burner to coal. Evaluate the effect of process operations on heat release, heat transfer, and accelerated fuel particle heat-up rates. Study the effect of changes in reactor conditions on transient temperature profiles, pressure balance, and product gas composition. Effects of Reactor Conditions on Synthesis Gas Composition--Evaluate the effect of air distribution, steam/coal ratio, solids-circulation rate, and reactor temperature on CO/CO{sub 2} ratio, synthesis gas Lower Heating Value (LHV), carbon conversion, and cold and hot gas efficiencies. Research Triangle Institute (RTI) Direct Sulfur Recovery Process (DSRP) Testing--Provide syngas in support of the DSRP commissioning. Loop Seal Operations--Optimize loop seal operations and investigate increases to previously achieved maximum solids-circulation rate.

  9. 基于LPNTI-PLC的HVAC系统反馈控制%HVAC System Feedback Control Method Based on LPNTI-PLC Research

    Institute of Scientific and Technical Information of China (English)

    王攀藻; 张华

    2015-01-01

    针对变风量中央空调系统HVAC,频繁工作、多干扰和控制滞后以及被控对象参数未知或是时变的情况,传统的控制方法不能够很好的消除干扰和控制延迟导致系统不能很好地进行反馈调节,控制效果欠佳。提出了基于拉氏正反变换积分PLC的HVAC系统反馈控制方法,该方法在多动态工况下的HVAC系统的应用,能够提高控制精度,根据系统输入、输出变化量阶跃响应,建立LPNTI积分控制模型,只要模型选取合适的参数,就能消除静差和余差,避免饱和超调,而且进一步校正模型的稳定性,使得适应HVAC系统动态工况,同时,基于鲁棒性能指标,控制方法设计了PLC控制模型。实验结果表明,此方法比传统的控制方法更具有优越性,体现了有效性和实用性,对提升HVAC系统的控制精度和响应速度具有较大的帮助。%For HVAC vav central air-conditioning system, frequently, interference and control work lag and the situation of the controlled object parameters are unknown or time-varying, traditional control methods can't eliminate interference and well control delay cause system can't good feedback adjustment, the control effect. And reverse transformation is proposed based on The Laplace integral PLC of The HVAC system feedback control method, The method in The application of dy⁃namic conditions of HVAC system, can improve The control precision, based on The system input and output variation step response, LPNTI integral control model is set up, as long as The model to select The appropriate parameters, can eliminate The static error and residual, avoid saturated overshoot, and further The stability of The calibration model, make to adapt to The HVAC system dynamic condition, at The same time, based on The robust performance index, The control method to de⁃sign The PLC control model. The experimental results show that this method is more superiority than

  10. Model Predictive Control of HVAC Systems: Implementation and Testing at the University of California, Merced

    Energy Technology Data Exchange (ETDEWEB)

    Haves, Phillip; Hencey, Brandon; Borrell, Francesco; Elliot, John; Ma, Yudong; Coffey, Brian; Bengea, Sorin; Wetter, Michael

    2010-06-29

    A Model Predictive Control algorithm was developed for the UC Merced campus chilled water plant. Model predictive control (MPC) is an advanced control technology that has proven successful in the chemical process industry and other industries. The main goal of the research was to demonstrate the practical and commercial viability of MPC for optimization of building energy systems. The control algorithms were developed and implemented in MATLAB, allowing for rapid development, performance, and robustness assessment. The UC Merced chilled water plant includes three water-cooled chillers and a two million gallon chilled water storage tank. The tank is charged during the night to minimize on-peak electricity consumption and take advantage of the lower ambient wet bulb temperature. The control algorithms determined the optimal chilled water plant operation including chilled water supply (CHWS) temperature set-point, condenser water supply (CWS) temperature set-point and the charging start and stop times to minimize a cost function that includes energy consumption and peak electrical demand over a 3-day prediction horizon. A detailed model of the chilled water plant and simplified models of the buildings served by the plant were developed using the equation-based modeling language Modelica. Steady state models of the chillers, cooling towers and pumps were developed, based on manufacturers performance data, and calibrated using measured data collected and archived by the control system. A detailed dynamic model of the chilled water storage tank was also developed and calibrated. Simple, semi-empirical models were developed to predict the temperature and flow rate of the chilled water returning to the plant from the buildings. These models were then combined and simplified for use in a model predictive control algorithm that determines the optimal chiller start and stop times and set-points for the condenser water temperature and the chilled water supply temperature. The

  11. Classroom HVAC: Improving ventilation and saving energy -- field study plan

    Energy Technology Data Exchange (ETDEWEB)

    Apte, Michael G.; Faulkner, David; Hodgson, Alfred T.; Sullivan, Douglas P.

    2004-10-14

    The primary goals of this research effort are to develop, evaluate, and demonstrate a very practical HVAC system for classrooms that consistently provides classrooms (CRs) with the quantity of ventilation in current minimum standards, while saving energy, and reducing HVAC-related noise levels. This research is motivated by the public benefits of energy efficiency, evidence that many CRs are under-ventilated, and public concerns about indoor environmental quality in CRs. This document provides a summary of the detailed plans developed for the field study that will take place in 2005 to evaluate the energy and IAQ performance of a new classroom HVAC technology. The field study will include measurements of HVAC energy use, ventilation rates, and IEQ conditions in 10 classrooms with the new HVAC technology and in six control classrooms with a standard HVAC system. Energy use and many IEQ parameters will be monitored continuously, while other IEQ measurements will be will be performed seasonally. Continuously monitored data will be remotely accessed via a LonWorks network. Instrument calibration plans that vary with the type of instrumentation used are established. Statistical tests will be employed to compare energy use and IEQ conditions with the new and standard HVAC systems. Strengths of this study plan include the collection of real time data for a full school year, the use of high quality instrumentation, the incorporation of many quality control measures, and the extensive collaborations with industry that limit costs to the sponsors.

  12. Solar Trigeneration: a Transitory Simulation of HVAC Systems Using Different Typologies of Hybrid Panels

    Directory of Open Access Journals (Sweden)

    Alejandro del Amo Sancho

    2014-03-01

    Full Text Available The high energy demand on buildings requires efficient installations and the integration of renewable energy to achieve the goal of reducing energy consumption using traditional energy sources. Usually, solar energy generation and heating loads have different profiles along a day and their maximums take place at different moments. In addition, in months in which solar production is higher, the heating demands are the minimum (hot water is consumed only domestically in summer. Cooling machines (absorption and adsorption allow using thermal energy to chill a fluid. This heat flow rate could be recovered from solar collectors or any other heat source. The aim of this study is to integrate different typologies of solar hybrid (photovoltaic and thermal collectors with cooling machines getting solar trigeneration and concluding the optimal combination for building applications. The heat recovered from the photovoltaic module is used to provide energy to these cooling machines getting a double effect: to get a better efficiency on PV modules and to cool the building. In this document the authors analyse these installations, their operating conditions, dimensions and parameters, in order to get the optimal installation in three different European cities. This work suggests that in a family house in Madrid, the optimal combination is to use CPVT with azimuthally tracking and absorption machine. In this case, the solar trigeneration system using 55 m2 of collector area saves the cooling loads and 79% of the heating load in the house round the year.

  13. POWER SYSTEMS DEVELOPMENT FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    Unknown

    2002-05-01

    This report discusses test campaign GCT3 of the Halliburton KBR transport reactor train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The transport reactor is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using one of two possible particulate control devices (PCDs). The transport reactor was operated as a pressurized gasifier during GCT3. GCT3 was planned as a 250-hour test run to commission the loop seal and continue the characterization of the limits of operational parameter variations using a blend of several Powder River Basin coals and Bucyrus limestone from Ohio. The primary test objectives were: (1) Loop Seal Commissioning--Evaluate the operational stability of the loop seal with sand and limestone as a bed material at different solids circulation rates and establish a maximum solids circulation rate through the loop seal with the inert bed. (2) Loop Seal Operations--Evaluate the loop seal operational stability during coal feed operations and establish maximum solids circulation rate. Secondary objectives included the continuation of reactor characterization, including: (1) Operational Stability--Characterize the reactor loop and PCD operations with short-term tests by varying coal feed, air/coal ratio, riser velocity, solids circulation rate, system pressure, and air distribution. (2) Reactor Operations--Study the devolatilization and tar cracking effects from transient conditions during transition from start-up burner to coal. Evaluate the effect of process operations on heat release, heat transfer, and accelerated fuel particle heat-up rates. Study the effect of changes in reactor conditions on transient temperature profiles, pressure balance, and product gas composition. (3) Effects of Reactor Conditions on Syngas Composition--Evaluate the effect of air distribution, steam

  14. Design principles of a nuclear and industrial HVAC of IFMIF

    Energy Technology Data Exchange (ETDEWEB)

    Pruneri, Giuseppe [IFMIF/EVEDA, Project Team, Rokkasho (Japan); Ibarra, A. [CIEMAT, Madrid (Spain); Heidinger, R. [F4E, Garching (Germany); Knaster, J. [IFMIF/EVEDA Project Team, Rokkasho (Japan); Sugimoto, M. [JAEA, Rokkasho (Japan)

    2016-02-15

    Highlights: • Parameter of Derivate air Contamination (DAC) allows to associate the type of air ventilation. • The construction and operation of IFMIF will be subjected to the regulations of the country in which it will be sited. • Structures, systems and components are assigned a particular safety important components (SIC, 1–2 and Non-SIC) clarification that is based on the consequences of their failure. • Reliability, Availability, Maintainability and Inspectability (RAMI) analysis has given a great contribution of the facility to optimize the configuration, particularly for the HVAC system. - Abstract: In 2013, the IFMIF, the International Fusion Material Irradiation Facility, presently in its Engineering Validation and Engineering Design Activities (EVEDA) phase, framed by the Broader Approach Agreement between Japan and EURATOM, accomplished in 2013 its mandate to provide the engineering design of the plant on schedule [1]. The IFMIF aims to qualify and characterize materials that are capable of withstanding the intense neutron flux originated in D-T reactions of future fusion reactors due to a neutron flux with a broad peak at 14 MeV, which is able to provide >20 dpa/fpy on small specimens in this EVEDA phase. The successful operation of such a challenging plant demands a careful assessment of the Conventional Facilities (CF), which have adequate redundancies to allow for the target plant availability [2]. The present paper addresses the design proposed in the IFMIF Intermediate Engineering Design Report regarding the CF, particularly the IFMIF's Nuclear and Industrial HVAC design. A preliminary feasibility study, including the initial configuration, calculations and reliability/availability analysis, were performed. The nuclear HVAC design was developed progressively; first, by establishing a conceptual design, starting from the system functional description, followed by the identification of the corresponding interfacing systems and their

  15. Co-simulation for performance prediction of integrated building and HVAC systems - An analysis of solution characteristics using a two-body system

    Energy Technology Data Exchange (ETDEWEB)

    Trcka, Marija; L.M. Hensena, Jan; Wetter, Michael

    2010-06-21

    Integrated performance simulation of buildings and heating, ventilation and airconditioning (HVAC) systems can help reducing energy consumption and increasing occupant comfort. However, no single building performance simulation (BPS) tool offers suffcient capabilities and flexibilities to analyze integrated building systems and to enable rapid prototyping of innovative building and system technologies. One way to alleviate this problem is to use co-simulation to integrate different BPS tools. Co-simulation approach represents a particular case of simulation scenario where at least two simulators solve coupled differential-algebraic systems of equations and exchange data that couples these equations during the time integration. This article analyzes how co-simulation influences consistency, stability and accuracy of the numerical approximation to the solution. Consistency and zero-stability are studied for a general class of the problem, while a detailed consistency and absolute stability analysis is given for a simple two-body problem. Since the accuracy of the numerical approximation to the solution is reduced in co-simulation, the article concludes by discussing ways for how to improve accuracy.

  16. Subsurface Facility System Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Eric Loros

    2001-07-31

    The Subsurface Facility System encompasses the location, arrangement, size, and spacing of the underground openings. This subsurface system includes accesses, alcoves, and drifts. This system provides access to the underground, provides for the emplacement of waste packages, provides openings to allow safe and secure work conditions, and interfaces with the natural barrier. This system includes what is now the Exploratory Studies Facility. The Subsurface Facility System physical location and general arrangement help support the long-term waste isolation objectives of the repository. The Subsurface Facility System locates the repository openings away from main traces of major faults, away from exposure to erosion, above the probable maximum flood elevation, and above the water table. The general arrangement, size, and spacing of the emplacement drifts support disposal of the entire inventory of waste packages based on the emplacement strategy. The Subsurface Facility System provides access ramps to safely facilitate development and emplacement operations. The Subsurface Facility System supports the development and emplacement operations by providing subsurface space for such systems as ventilation, utilities, safety, monitoring, and transportation.

  17. Evaluating performance indices of a shopping centre and implementing HVAC control principles to minimize energy usage

    OpenAIRE

    Canbay, Çağlar Selçuk; Hepbaşlı, Arif; Gökçen Akkurt, Gülden

    2004-01-01

    Heating, ventilating and air-conditioning (HVAC) systems in buildings must be integrated with an efficient control scheme to maintain comfort under any load conditions. Efficient HVAC control is often the most cost-effective option to improve the energy efficiency of a building. However, HVAC processes are non-linear, and characteristics change on a seasonal basis so the effect of changing the control strategy is usually difficult to predict. The present study aims to reduce energy consumptio...

  18. EPA Facility Registry System (FRS): NEPT

    Data.gov (United States)

    U.S. Environmental Protection Agency — This web feature service contains location and facility identification information from EPA's Facility Registry System (FRS) for the subset of facilities that link...

  19. EPA Facility Registry System (FRS): NCES

    Data.gov (United States)

    U.S. Environmental Protection Agency — This web feature service contains location and facility identification information from EPA's Facility Registry System (FRS) for the subset of facilities that link...

  20. Development of a system for detection and diagnosis of errors in the operation of space HVAC systems; Entwicklung eines Systems zur Erkennung und Diagnose von Fehlern beim Betrieb von HLK-Anlagen

    Energy Technology Data Exchange (ETDEWEB)

    Bach, H.; Bauer, M.; Grob, R.F. [Stuttgart Univ. (Germany). Lehrstuhl fuer Heiz- und Raumlufttechnik

    1997-12-31

    Buildings with heating and space HVAC systems require considerable automatic control effort to ensure engergy-efficient operation. Faults are only to be avoided by the use of automatic fault detection systems. The contribution describes the procedure adopted in operation monitoring, the IKE system for fault detection and diagnosis, and the evaluation of the FDD system. (MSK) [Deutsch] Gebaeude mit heiz-und raumlufttechnischen Anlagen erfordern bei energetisch rationellem Bertrieb einen grossen Aufwand an Steuerungs-und Regelungstechnik. Um ohne Fehler zu arbeiten erfordert diese Steuerungs-und Regelungstechnik den Einsatz von automatischen Fehlererkennungssystemen. Im Folgenden werden die Vorgehensweise bei der Betriebsueberwachung, das IKE-System zur Fehlererkennung und Diagnose sowie die Evaluierung des FDD-Systems (Fault Detection and Diagnosis System) erlaeutert.

  1. The HVAC Control Technology Making Energy Saving Compatible with Comfort

    Science.gov (United States)

    Takagi, Yasuo; Yonezawa, Kenzo; Murayama, Dai; Nishimura, Nobutaka; Hanada, Yuuichi; Yamazaki, Kenichi

    The new air-conditioning control technology for the energy saving for buildings is proposed. The method is mainly focused on the compatibility of energy savings and comfort. The energy saving is achieved through the next generation air handling unit that controls room humidity without energy loss and the optimal operation of HVAC (Heating, Ventilating and air-conditioning) system, manipulating the supplying airflow temperature to the rooms, room temperature and the humidity. The comfort is kept by the index (PMV: Predicted Mean Vote) that calculated with room temperature, humidity, radiation temperature, wind velocity and so on. In order to find the HVAC system operation conditions that satisfy the comfort and energy saving at the same time, very large-scale nonlinear programming with nonlinear constraints must be solved on real time basis. To make the programming of the system practical, the driving function loaded onto a control computer is introduced. The function is made by the spline interpolation to achieve calculation stable and to adapt to various HVAC operation modes. The effectiveness of the HVAC control technology is proved through a building HVAC data and the simulations using the data.

  2. Building America Top Innovations 2014 Profile: HVAC Cabinet Air Leakage Test Method

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-11-01

    This 2014 Top Innovation profile describes Building America-funded research by teams and national laboratories that resulted in the development of an ASHRAE standard and a standardized testing method for testing the air leakage of HVAC air handlers and furnace cabinets and has spurred equipment manufacturers to tighten the cabinets they use for residential HVAC systems.

  3. Active noise control: A tutorial for HVAC designers

    Energy Technology Data Exchange (ETDEWEB)

    Gelin, L.J.

    1997-08-01

    This article will identify the capabilities and limitations of ANC in its application to HVAC noise control. ANC can be used in ducted HVAC systems to cancel ductborne, low-frequency fan noise by injecting sound waves of equal amplitude and opposite phase into an air duct, as close as possible to the source of the unwanted noise. Destructive interference of the fan noise and injected noise results in sound cancellation. The noise problems that it solves are typically described as rumble, roar or throb, all of which are difficult to address using traditional noise control methods. This article will also contrast the use of active against passive noise control techniques. The main differences between the two noise control measures are acoustic performance, energy consumption, and design flexibility. The article will first present the fundamentals and basic physics of ANC. The application to real HVAC systems will follow.

  4. Job Prospects in HVAC Engineering.

    Science.gov (United States)

    Basta, Nicholas

    1985-01-01

    Although heating, ventilation, and air conditioning (HVAC) engineering degrees are not offered, there is a serious need for specialists and consultants in this area (since most have been trained as mechanical engineers). Opportunities exist for individuals possessing a customer-oriented attitude, with knowledge in computerized controls, innovative…

  5. Job Prospects in HVAC Engineering.

    Science.gov (United States)

    Basta, Nicholas

    1985-01-01

    Although heating, ventilation, and air conditioning (HVAC) engineering degrees are not offered, there is a serious need for specialists and consultants in this area (since most have been trained as mechanical engineers). Opportunities exist for individuals possessing a customer-oriented attitude, with knowledge in computerized controls, innovative…

  6. Building Assessment Survey and Evaluation Study Summarized Data - HVAC Characteristics

    Science.gov (United States)

    In the Building Assessment Survey and Evaluation (BASE) Study Information on the characteristics of the heating, ventilation, and air conditioning (HVAC) system(s) in the entire BASE building including types of ventilation, equipment configurations, and operation and maintenance issues was acquired by examining the building plans, conducting a building walk-through, and speaking with the building owner, manager, and/or operator.

  7. Ventilation, temperature, and HVAC characteristics in small and medium commercial buildings in California.

    Science.gov (United States)

    Bennett, D H; Fisk, W; Apte, M G; Wu, X; Trout, A; Faulkner, D; Sullivan, D

    2012-08-01

    This field study of 37 small and medium commercial buildings throughout California obtained information on ventilation rate, temperature, and heating, ventilating, and air-conditioning (HVAC) system characteristics. The study included seven retail establishments; five restaurants; eight offices; two each of gas stations, hair salons, healthcare facilities, grocery stores, dental offices, and fitness centers; and five other buildings. Fourteen (38%) of the buildings either could not or did not provide outdoor air through the HVAC system. The air exchange rate averaged 1.6 (s.d. = 1.7) exchanges per hour and was similar between buildings with and without outdoor air supplied through the HVAC system, indicating that some buildings have significant leakage or ventilation through open windows and doors. Not all buildings had sufficient air exchange to meet ASHRAE 62.1 Standards, including buildings used for fitness centers, hair salons, offices, and retail establishments. The majority of the time, buildings were within the ASHRAE temperature comfort range. Offices were frequently overcooled in the summer. All of the buildings had filters, but over half the buildings had a filter with a minimum efficiency reporting value rating of 4 or lower, which are not very effective for removing fine particles. Most U.S. commercial buildings (96%) are small- to medium-sized, using nearly 18% of the country's energy, and sheltering a large population daily. Little is known about the ventilation systems in these buildings. This study found a wide variety of ventilation conditions, with many buildings failing to meet relevant ventilation standards. Regulators may want to consider implementing more complete building inspections at commissioning and point of sale. © 2012 John Wiley & Sons A/S.

  8. Experimental study on HVAC sound parameters

    Science.gov (United States)

    Bujoreanu, C.; Benchea, M.

    2016-08-01

    HVAC system represent major source of buildings internal noise and therefore they are designed to provide a human acoustic comfort besides the thermal and air quality requirements. The paper experimentally investigates three types of commercial air handler units (AHU) with different ducts cross-section sizes and inlet-outlet configuration. The measurements are performed in an anechoic room. The measurements are carried out at different fan's speeds, ranging the power-charge from 30-100% while the duct air flow is slowly adjusted from full open to full closed, between 0-500 Pa. The sound pressure levels of the radiant units are rated using NR curves. Also, the supply and the outdoor ducts sound levels are compared in order to point the frequencies where the noise must be reduced. Third-octave band analysis of random noise of an air handling unit from a HVAC system is realized, using measurement procedures that agrees the requirements of the ISO 3744:2011 and ISO 5136:2010 standards. The comparatively results highlight the effects of the geometry, air flow pressure and power-charging dependencies upon the sound level. This is the start for a noise reduction strategy.

  9. Analysis and control of the effects of over excitation limiters on the stability of the Itaipu HVAC transmission system

    Energy Technology Data Exchange (ETDEWEB)

    Jardim, J.L.; Macedo, N.J.; Santo, S.E.; Praca, A.S. [FURNAS Centrais Eletricas S.A., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    The effect of over excitation limiters on power system voltage stability is presented in this paper. A linear analysis based on system eigenvalues for various operating conditions shows that voltage collapse is essentially a dynamic phenomenon. Time simulations using digital tools and real-time simulator were performed to verify lin ear results and study large disturbances. A control system designed to keep system in secure region is proposed. (author) 3 refs., 9 figs.

  10. Stores, Weight and Inertial System Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility provides stores weight, center of gravity, and inertia measurements in support of weapon/aircraft compatibility testing. System provides store weight...

  11. "暖通空调工程设计方法与系统分析"课程教学方法探讨%Discussion on"HVAC Engineering Design and System Analysis"Teaching Method

    Institute of Scientific and Technical Information of China (English)

    夏燚

    2015-01-01

    本文用"思维导图"梳理暖通空调工程设计课程与专业基础课的内在联系,提出用"工科思维"模式学习该课程,把专业基础课的"知识线"构织成该课程的"知识网".本文用"暖通空调工程设计过程图"帮助学生从全局上掌握该"知识网",采用"案例教学"帮助学生掌握暖通空调工程设计技能,帮助学生实现由专业知识向解决工程问题专业技能的转变,从而达到本课程的教学目的.%In this paper, we use"the mind map"to comb the relationship between the course of"HVAC engineering de-sign method and system analysis"and the specialized basic course. The"engineering thinking mode"is put forward to study the course, and use the"knowledge line"of the specialized basic course to construct the"knowledge network". We use the"HVAC engineering design flowchart"to help students master the"knowledge network"from the global, using"the case teaching method"to help students master the skills of HVAC design to help students realize the transformation from knowledge to skills, so as to achieve the purpose of teaching the course.

  12. Particle loading rates for HVAC filters, heat exchangers, and ducts.

    Science.gov (United States)

    Waring, M S; Siegel, J A

    2008-06-01

    The rate at which airborne particulate matter deposits onto heating, ventilation, and air-conditioning (HVAC) components is important from both indoor air quality (IAQ) and energy perspectives. This modeling study predicts size-resolved particle mass loading rates for residential and commercial filters, heat exchangers (i.e. coils), and supply and return ducts. A parametric analysis evaluated the impact of different outdoor particle distributions, indoor emission sources, HVAC airflows, filtration efficiencies, coils, and duct system complexities. The median predicted residential and commercial loading rates were 2.97 and 130 g/m(2) month for the filter loading rates, 0.756 and 4.35 g/m(2) month for the coil loading rates, 0.0051 and 1.00 g/month for the supply duct loading rates, and 0.262 g/month for the commercial return duct loading rates. Loading rates are more dependent on outdoor particle distributions, indoor sources, HVAC operation strategy, and filtration than other considered parameters. The results presented herein, once validated, can be used to estimate filter changing and coil cleaning schedules, energy implications of filter and coil loading, and IAQ impacts associated with deposited particles. The results in this paper suggest important factors that lead to particle deposition on HVAC components in residential and commercial buildings. This knowledge informs the development and comparison of control strategies to limit particle deposition. The predicted mass loading rates allow for the assessment of pressure drop and indoor air quality consequences that result from particle mass loading onto HVAC system components.

  13. Brayton Isotope Power System (BIPS) facility specification

    Energy Technology Data Exchange (ETDEWEB)

    1976-05-31

    General requirements for the Brayton Isotope Power System (BIPS)/Ground Demonstration System (GDS) assembly and test facility are defined. The facility will include provisions for a complete test laboratory for GDS checkout, performance, and endurance testing, and a contamination-controlled area for assembly, fabrication, storage, and storage preparation of GDS components. Specifications, schedules, and drawings are included.

  14. Air conditioning and energy conservation. Improved space HVAC systems. Case studies: Office buildings, hotels, shopping centers, skyscrapers, industrial plants

    Energy Technology Data Exchange (ETDEWEB)

    Heiner, H.

    1988-08-01

    Rising energy prices and an increasing demand for comfortable rooms account for the importance attached to the windows and glass used for office buildings, hotels and industrial plants. Both windows and glass have a considerable influence on the thermal behavior and air conditioning of buildings. Among the latest developments are precious metal-coated insulating panes. Selected gases allow to reduce the total thickness of insulating glass and improve noise insulation. The case studies presented refer to the energy-saving air conditioning and space heating, heat recovery and cooling of rooms as well as to the respective control systems. Investigations into the specific energy consumption of building shells reveal the considerable space/tap water heating energy conservation potentials remaining to be utilized.

  15. Workplace Trends In HVAC/R

    Science.gov (United States)

    Strang, Lynn; Todd, CeCe

    2013-01-01

    This article presents trends in the heating, ventilation, air conditioning and refrigeration (HVAC/R) industry, with an emphasis on the importance of technician training programs as exemplified at the East Valley Institute of Technology (EVIT) in Mesa, Arizona. The article states that HVAC workers are increasingly helping their consumers "go…

  16. Workplace Trends In HVAC/R

    Science.gov (United States)

    Strang, Lynn; Todd, CeCe

    2013-01-01

    This article presents trends in the heating, ventilation, air conditioning and refrigeration (HVAC/R) industry, with an emphasis on the importance of technician training programs as exemplified at the East Valley Institute of Technology (EVIT) in Mesa, Arizona. The article states that HVAC workers are increasingly helping their consumers "go…

  17. Impact of the duct static pressure reset control strategy on the energy consumption by the HVAC system

    Directory of Open Access Journals (Sweden)

    Walaszczyk Juliusz

    2017-01-01

    Full Text Available This article addresses different duct static pressure control strategies which could be implemented in variable air volume air-conditioning systems (VAV. Two pressure reset control strategies are compared to the commonly used control solution based on the “Constant static pressure” method. First pressure reset control strategy, known as PID Control, uses signals from VAV boxes controllers to reset duct static pressure in a way that one of the VAV dampers is maintained almost entirely open. Second strategy decreases static pressure setpoint until an adjustable number of pressure requests occur. As a response to the certain amount of requests, static pressure setpoint is increased. This strategy is called Trim & Respond. Both static pressure reset control strategies described in this paper are considered to have more significant potential for energy savings than the “Constant static pressure” method. In order to validate this potential, several simulations for different control strategies were carried out and the obtained results are compared and analysed. The theoretical limit of the energy savings - set of the optimal control actions, was estimated with Nelder-Mead algorithm and also presented in this article. General description of the static pressure control strategies "Constant static pressure", PID Control and Trim & Respond is given.

  18. Novel Methods for Activity Classification and Occupany Prediction Enabling Fine-grained HVAC Control

    OpenAIRE

    Rana, Rajib; Kusy, Brano; Wall, Josh; Hu, Wen

    2014-01-01

    Much of the energy consumption in buildings is due to HVAC systems, which has motivated several recent studies on making these systems more energy- efficient. Occupancy and activity are two important aspects, which need to be correctly estimated for optimal HVAC control. However, state-of-the-art methods to estimate occupancy and classify activity require infrastructure and/or wearable sensors which suffers from lower acceptability due to higher cost. Encouragingly, with the advancement of th...

  19. SEED: Public Energy and Environment Dataset for Optimizing HVAC Operation in Subway Stations

    OpenAIRE

    Wang, Yongcai; Feng, Haoran; Qi, Xiao

    2013-01-01

    For sustainability and energy saving, the problem to optimize the control of heating, ventilating, and air-conditioning (HVAC) systems has attracted great attentions, but analyzing the signatures of thermal environments and HVAC systems and the evaluation of the optimization policies has encountered inefficiency and inconvenient problems due to the lack of public dataset. In this paper, we present the Subway station Energy and Environment Dataset (SEED), which was collected from a line of Bei...

  20. Air filtration in HVAC systems

    CERN Document Server

    Ginestet, Alain; Tronville, Paolo; Hyttinen, Marko

    2010-01-01

    Air filtration Guidebook will help the designer and user to understand the background and criteria for air filtration, how to select air filters and avoid problems associated with hygienic and other conditions at operation of air filters. The selection of air filters is based on external conditions such as levels of existing pollutants, indoor air quality and energy efficiency requirements.

  1. Integral lightning protection system in petroleum facilities

    Energy Technology Data Exchange (ETDEWEB)

    Torres, Horacio; Gallego, Luis; Montana, Johny; Younes, Camilo; Rondon, Daniel; Gonzalez, Diego; Herrera, Javier; Perez, Ernesto; Vargas, Mauricio; Quintana, Carlos; Salgado, Milton [Universidad Nacional de Colombia, Bogota (Colombia)]. E-mail: paas@paas.unal.edu.co

    2001-07-01

    This paper presents an Integral Lightning Protection System, focused mainly in petroleum facilities and applied to a real case in Colombia, South America. As introduction it is presented a summary of the incidents happened in last years, a diagnosis and the proposal of solution. Finally, as part of the analysis, a lightning risk assessment for the Central Process Facility is showed. (author)

  2. Energy-efficient HVAC design an essential guide for sustainable building

    CERN Document Server

    Khazaii, Javad

    2014-01-01

    This book provides readers with essential knowledge enabling the successful design of today's new energy efficient HVAC systems. The author introduces important concepts such as Knowledge Categorization, Performance Based Design Standards, and Quantification of Uncertainty in Energy Modeling for Buildings. Pivotal topics that all HVAC and architectural engineers must master in order to navigate the green building renaissance are given focused attention, including the role of renewables, air quality, automatic controls, and thermal comfort. Relevant ASHRAE standards, as well as sustainability s

  3. Photovoltaic Systems Test Facilities: Existing capabilities compilation

    Science.gov (United States)

    Volkmer, K.

    1982-01-01

    A general description of photovoltaic systems test facilities (PV-STFs) operated under the U.S. Department of Energy's photovoltaics program is given. Descriptions of a number of privately operated facilities having test capabilities appropriate to photovoltaic hardware development are given. A summary of specific, representative test capabilities at the system and subsystem level is presented for each listed facility. The range of system and subsystem test capabilities available to serve the needs of both the photovoltaics program and the private sector photovoltaics industry is given.

  4. HVAC (heating, ventilation, air conditioning) literature in Japan: A critical review

    Energy Technology Data Exchange (ETDEWEB)

    Hane, G.J.

    1988-02-01

    Japanese businessmen in the heating, ventilation, air conditioning, and refrigeration (HVACandR) industry consider the monitoring of technical and market developments in the United States to be a normal part of their business. In contrast, efforts by US businessmen to monitor Japanese HVAC and R developments are poorly developed. To begin to redress this imbalance, this report establishes the groundwork for a more effective system for use in monitoring Japanese HVAC and R literature. Discussions of a review of the principal HVAC and R publications in Japan and descriptions of the type of information contained in each of those publications are included in this report. Since the Japanese HVAC and R literature is abundant, this report also provides practical suggestions on how a researcher or research manager can limit the monitoring effort to the publications and type of information that would most likely be of greatest value.

  5. The NYC native air sampling pilot project: using HVAC filter data for urban biological incident characterization.

    Science.gov (United States)

    Ackelsberg, Joel; Leykam, Frederic M; Hazi, Yair; Madsen, Larry C; West, Todd H; Faltesek, Anthony; Henderson, Gavin D; Henderson, Christopher L; Leighton, Terrance

    2011-09-01

    Native air sampling (NAS) is distinguished from dedicated air sampling (DAS) devices (eg, BioWatch) that are deployed to detect aerosol disseminations of biological threat agents. NAS uses filter samples from heating, ventilation, and air conditioning (HVAC) systems in commercial properties for environmental sampling after DAS detection of biological threat agent incidents. It represents an untapped, scientifically sound, efficient, widely distributed, and comparably inexpensive resource for postevent environmental sampling. Calculations predict that postevent NAS would be more efficient than environmental surface sampling by orders of magnitude. HVAC filter samples could be collected from pre-identified surrounding NAS facilities to corroborate the DAS alarm and delineate the path taken by the bioaerosol plume. The New York City (NYC) Native Air Sampling Pilot Project explored whether native air sampling would be acceptable to private sector stakeholders and could be implemented successfully in NYC. Building trade associations facilitated outreach to and discussions with property owners and managers, who expedited contact with building managers of candidate NAS properties that they managed or owned. Nominal NAS building requirements were determined; procedures to identify and evaluate candidate NAS facilities were developed; data collection tools and other resources were designed and used to expedite candidate NAS building selection and evaluation in Manhattan; and exemplar environmental sampling playbooks for emergency responders were completed. In this sample, modern buildings with single or few corporate tenants were the best NAS candidate facilities. The Pilot Project successfully demonstrated that in one urban setting a native air sampling strategy could be implemented with effective public-private collaboration.

  6. Definition and means of maintaining the ventilation system confinement portion of the PFP safety envelope

    Energy Technology Data Exchange (ETDEWEB)

    Dick, J.D.; Grover, G.A.; O`Brien, P.M., Fluor Daniel Hanford

    1997-03-05

    The Plutonium Finishing Plant Heating Ventilation and Cooling system provides for the confinement of radioactive releases to the environment and provides for the confinement of radioactive contamination within designated zones inside the facility. This document identifies the components and procedures necessary to ensure the HVAC system provides these functions. Appendices E through J provide a snapshot of non-safety class HVAC equipment and need not be updated when the remainder of the document and Appendices A through D are updated.

  7. Communication Facilities for Distributed Systems

    Directory of Open Access Journals (Sweden)

    V. Barladeanu

    1997-01-01

    Full Text Available The design of physical networks and communication protocols in Distributed Systems can have a direct impact on system efficiency and reliability. This paper tries to identify efficient mechanisms and paradigms for communication in distributed systems.

  8. Impact of HVAC control improvements on supermarket humidity levels

    Energy Technology Data Exchange (ETDEWEB)

    Khattar, M.; Henderson, H.I. Jr.

    1999-07-01

    This paper presents field-monitored data from two supermarkets where the impact of implementing minor HVAC control improvements was evaluated. The control improvements were intended to increase the dehumidification capacity of the HVAC system and lower space humidity levels. Direct digital control (DDC) was installed at each store to monitor system performance and implement the control improvements. At the first test store, a 33,400 ft{sup 2} (3,104 m{sup 2}) supermarket near Minneapolis, a conventional 50 ton (176 kW) split system conditioned the sales area. At the second store, a 50,000 ft{sup 2} (4,647 m{sup 2}{minus}) supermarket near Indianapolis, three rooftop units (RTUs) with a total capacity of 98 tons (344 kW) conditioned the store. The results from both supermarkets confirm the impact that supply airflow and part-load control of evaporator coil temperatures can have on dehumidification performance. Seemingly minor control adjustments can often have a big impact on the performance of supermarket HVAC systems. Even enhanced dehumidification technologies, such as heat pipe-assisted evaporator coils, can benefit from minor system tuning.

  9. HVAC-DYNAMIC: a training simulator for dynamic analysis of HVAC plants

    Directory of Open Access Journals (Sweden)

    Morten Heintz

    1989-07-01

    Full Text Available HVAC-DYNAMIC is a software tool for the dynamic simulation of Heating, Ventilation and Air Conditioning (HVAC plants. The program is designed to be used by HVAC engineers during design or troubleshooting of plants and by plant operators in their training. The program is based on a set of the most-used HVAC plant configurations and requires only a minimum of knowledge in numeric methods and programming. A brief presentation of the program structure and examples showing some of the application of the program are given.

  10. ENERGY STAR Certified Light Commercial HVAC

    Data.gov (United States)

    U.S. Environmental Protection Agency — Certified models meet all ENERGY STAR requirements as listed in the Version 2.0 ENERGY STAR Program Requirements for Light Commercial HVAC that are effective as of...

  11. HVAC design manual for hospitals and clinics

    National Research Council Canada - National Science Library

    2013-01-01

    "Provides in-depth design recommendations and proven, cost effective, and reliable solutions for health care HVAC design that provide low maintenance cost and high reliability based on best practices...

  12. ANFIS -Based Navigation for HVAC Service Robot with Image Processing

    Science.gov (United States)

    Salleh, Mohd Zoolfadli Md; Rashid, Nahrul Khair Alang Md; Mohd Mustafah, Yasir

    2013-12-01

    In this paper, we present an ongoing work on the autonomous navigation of a mobile service robot for Heat, Ventilation and Air Condition (HVAC) ducting. CCD camera mounted on the front-end of our robot is used to analyze the ducts openings (blob analysis) in order to differentiate them from other landmarks (blower fan, air outlets and etc). Distance between the robot and duct openings is measured using ultrasonic sensor. Controller chosen is ANFIS where its architecture accepts three inputs; recognition of duct openings, robot positions and distance while the outputs is maneuver direction (left or right).45 membership functions are created from which produces 46 training epochs. In order to demonstrate the functionality of the system, a working prototype is developed and tested inside HVAC ducting in ROBOCON Lab, IIUM.

  13. On-site study of HCFC-22 substitution for HFC non-azeotropic blends (R417A, R422D) on a water chiller of a centralized HVAC system

    Energy Technology Data Exchange (ETDEWEB)

    Torrella, E.; Larumbe, J.A. [Polytechnic University of Valencia, Dep. of Applied Thermodynamics, Camino de Vera 14, E-46022 Valencia (Spain); Cabello, R.; Sanchez, D.; Llopis, R. [Jaume I University, Dep. of Mechanical Engineering and Construction, Campus de Riu Sec s/n, E-12071 Castellon (Spain)

    2010-09-15

    The European Regulation no 2037/2000 has banned manufacturing HCFC refrigerants from January 1st 2010, although its use is allowed up to 2015 if the fluids come from a recycling process. This situation creates the need for developing new working fluids to replace the HCFC in the refrigeration plants now in operation. Among all the HCFCs the R22 is the most widely used in a wide range of applications, especially in air conditioning. This work presents an on-site experimental study of the R22 replacement by two possible substitutes, the HFC-417A and the HFC-422D, in a water chiller in which the energy performance was evaluated. This chiller is part of the centralized HVAC system of a lecture room building at the Jaume I University of Castellon, Spain. This communication compares and analyses main operation parameters of the chiller when operating with each refrigerant in real conditions. (author)

  14. Radiation Safety Systems for Accelerator Facilities

    Energy Technology Data Exchange (ETDEWEB)

    James C. Liu; Jeffrey S. Bull; John Drozdoff; Robert May; Vaclav Vylet

    2001-10-01

    The Radiation Safety System (RSS) of an accelerator facility is used to protect people from prompt radiation hazards associated with accelerator operation. The RSS is a fully interlocked, engineered system with a combination of passive and active elements that are reliable, redundant, and fail-safe. The RSS consists of the Access Control System (ACS) and the Radiation Containment System (RCS). The ACS is to keep people away from the dangerous radiation inside the shielding enclosure. The RCS limits and contains the beam/radiation conditions to protect people from the prompt radiation hazards outside the shielding enclosure in both normal and abnormal operations. The complexity of a RSS depends on the accelerator and its operation, as well as associated hazard conditions. The approaches of RSS among different facilities can be different. This report gives a review of the RSS for accelerator facilities.

  15. Radiation Safety Systems for Accelerator Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Liu, James C

    2001-10-17

    The Radiation Safety System (RSS) of an accelerator facility is used to protect people from prompt radiation hazards associated with accelerator operation. The RSS is a fully interlocked, engineered system with a combination of passive and active elements that are reliable, redundant, and fail-safe. The RSS consists of the Access Control System (ACS) and the Radiation Containment System (RCS). The ACS is to keep people away from the dangerous radiation inside the shielding enclosure. The RCS limits and contains the beam/radiation conditions to protect people from the prompt radiation hazards outside the shielding enclosure in both normal and abnormal operations. The complexity of a RSS depends on the accelerator and its operation, as well as associated hazard conditions. The approaches of RSS among different facilities can be different. This report gives a review of the RSS for accelerator facilities.

  16. Power Systems Development Facility. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    The objective of the PSDF would be to provide a modular facility which would support the development of advanced, pilot-scale, coal-based power systems and hot gas clean-up components. These pilot-scale components would be designed to be large enough so that the results can be related and projected to commercial systems. The facility would use a modular approach to enhance the flexibility and capability for testing; consequently, overall capital and operating costs when compared with stand-alone facilities would be reduced by sharing resources common to different modules. The facility would identify and resolve technical barrier, as well as-provide a structure for long-term testing and performance assessment. It is also intended that the facility would evaluate the operational and performance characteristics of the advanced power systems with both bituminous and subbituminous coals. Five technology-based experimental modules are proposed for the PSDF: (1) an advanced gasifier module, (2) a fuel cell test module, (3) a PFBC module, (4) a combustion gas turbine module, and (5) a module comprised of five hot gas cleanup particulate control devices. The final module, the PCD, would capture coal-derived ash and particles from both the PFBC and advanced gasifier gas streams to provide for overall particulate emission control, as well as to protect the combustion turbine and the fuel cell.

  17. Production Facility System Reliability Analysis Report

    Energy Technology Data Exchange (ETDEWEB)

    Dale, Crystal Buchanan [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Klein, Steven Karl [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-10-06

    This document describes the reliability, maintainability, and availability (RMA) modeling of the Los Alamos National Laboratory (LANL) design for the Closed Loop Helium Cooling System (CLHCS) planned for the NorthStar accelerator-based 99Mo production facility. The current analysis incorporates a conceptual helium recovery system, beam diagnostics, and prototype control system into the reliability analysis. The results from the 1000 hr blower test are addressed.

  18. VARIABLE SPEED INTEGRATED INTELLIGENT HVAC BLOWER

    Energy Technology Data Exchange (ETDEWEB)

    Shixiao Wang; Herman Wiegman; Wilson Wu; John Down; Luana Iorio; Asha Devarajan; Jing Wang; Ralph Carl; Charlie Stephens; Jeannine Jones; Paul Szczesny

    2001-11-14

    This comprehensive topical report discusses the key findings in the development of a intelligent integrated blower for HVAC applications. The benefits of rearward inclined blades over that of traditional forward inclined blades is well documented and a prototype blower design is presented. A comparison of the proposed blower to that of three typical units from the industry is presented. The design of the blower housing is also addressed and the impact of size limitations on static efficiency is discussed. Issues of air flow controllability in the rearward inclined blower is addressed and a solution to this problem is proposed. Several motor design options are discussed including inside-out radial flux designs and novel axial flux designs, all are focused on the various blower needs. The control of the motor-blower and airflow through the use of a high density inverter stage and modern digital signal processor is presented. The key technical challenges of the approach are discussed. The use of the motor as a sensor in the larger heating/ventilating system is also discussed. Diagnostic results for both the motor itself and the blower system are presented.

  19. Rendezvous Facilities in a Distributed Computer System

    Institute of Scientific and Technical Information of China (English)

    廖先Zhi; 金兰

    1995-01-01

    The distributed computer system described in this paper is a set of computer nodes interconnected in an interconnection network via packet-switching interfaces.The nodes communicate with each other by means of message-passing protocols.This paper presents the implementation of rendezvous facilities as high-level primitives provided by a parallel programming language to support interprocess communication and synchronization.

  20. Preoperational test report, vent building ventilation system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-04

    This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  1. State of the Art of HVAC Technology in Europe and America

    DEFF Research Database (Denmark)

    Olesen, Bjarne W.; Kazanci, Ongun Berk

    2015-01-01

    mechanisms and media to emit and remove heat or moisture from indoor spaces (e.g. hydronic radiant heating and cooling systems, fan-coil units, and active beams). The main differences between HVAC systems in Europe, North America and other parts of the world are often the indoor terminal units. Type...... for increasing the energy efficiency of HVAC (heating, ventilation and air-conditioning) systems and for increasing the amount of renewable energy used. Especially these types of systems are getting increasing attention in Europe and North-America. In the present study, operation characteristics, possibilities...

  2. Biotechnology System Facility: Risk Mitigation on Mir

    Science.gov (United States)

    Gonda, Steve R., III; Galloway, Steve R.

    2003-01-01

    NASA is working with its international partners to develop space vehicles and facilities that will give researchers the opportunity to conduct scientific investigations in space. As part of this activity, NASA's Biotechnology Cell Science Program (BCSP) at the Johnson Space Center (JSC) is developing a world-class biotechnology laboratory facility for the International Space Station (ISS). This report describes the BCSP, including the role of the BTS. We identify the purpose and objectives of the BTS and a detailed description of BTS facility design and operational concept, BTS facility and experiment-specific hardware, and scientific investigations conducted in the facility. We identify the objectives, methods, and results of risk mitigation investigations of the effects of microgravity and cosmic radiation on the BTS data acquisition and control system. These results may apply to many other space experiments that use commercial, terrestrial-based data acquisition technology. Another focal point is a description of the end-to-end process of integrating and operating biotechnology experiments on a variety of space vehicles. The identification of lessons learned that can be applied to future biotechnology experiments is an overall theme of the report. We include a brief summary of the science results, but this is not the focus of the report. The report provides some discussion on the successful 130-day tissue engineering experiment performed in BTS on Mir and describes a seminal gene array investigation that identified a set of unique genes that are activated in space.

  3. FRS (Facility Registration System) Sites, Geographic NAD83, EPA (2007) [facility_registration_system_sites_LA_EPA_2007

    Data.gov (United States)

    Louisiana Geographic Information Center — This dataset contains locations of Facility Registry System (FRS) sites which were pulled from a centrally managed database that identifies facilities, sites or...

  4. Physical Sciences Facility Air Emission Control Equivalency Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Brown, David M.; Belew, Shan T.

    2008-10-17

    This document presents the adequacy evaluation for the application of technology standards during design, fabrication, installation and testing of radioactive air exhaust systems at the Physical Sciences Facility (PSF), located on the Horn Rapids Triangle north of the Pacific Northwest National Laboratory (PNNL) complex. The analysis specifically covers the exhaust portion of the heating, ventilation and air conditioning (HVAC) systems associated with emission units EP-3410-01-S, EP-3420-01-S and EP 3430-01-S.

  5. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    Science.gov (United States)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  6. ENVIRONMENTAL AND FINANCIAL INDICATORS OF THE RETROFIT OF HVAC SYSTEM OF A BANK BRANCH = INDICADORES AMBIENTAIS E FINANCEIROS DO RETROFIT DO SISTEMA DE AR CONDICIONADO DE UMA AGÊNCIA BANCÁRIA

    Directory of Open Access Journals (Sweden)

    Marcio Ferreira de Lima

    2016-09-01

    Full Text Available The purpose of this study was to analyze some environmental and financial indicators of the retrofit installation in the heating, ventilating and air conditioning system (HVAC of a bank branch. The building is located in downtown Florianópolis, SC, Brazil. The replacement of the system occurred in 2012. The method analyzed the results of the year 2013 compared with previous years in the matters of: energy efficiency, mitigation of greenhouse gases (GHG and financial investment analysis. The results were: 24.18% electricity savings and 51.31 tCO2eq mitigation of GHG emissions that are equivalent to planting 536 trees. The financial analysis showed that the retrofit is advantageous with benefit-cost ratio 0.60 and 14.85 years payback period. It was concluded that one year after the implementation of the retrofit was achieved the expected objective, which was to replace the old HVAC system with a new one more energy efficient, reducing energy consumption and the resulting reduction of the environmental impact. = O objetivo deste artigo é analisar alguns indicadores ambientais e financeiros da obra de retrofit do sistema de ar condicionado de uma agência bancária. O edifício está localizado no centro da cidade de Florianópolis, SC. A substituição do sistema ocorreu no ano de 2012. O método analisou os resultados do ano de 2013 em comparação com os anos anteriores quanto aos aspectos de: eficiência energética, mitigação de emissões de gases de efeito estufa (GEE e análise financeira do investimento. Os resultados foram: economia de 24,18% de energia elétrica e mitigação de 51,31 tCO2eq das emissões de GEE que são equivalentes ao plantio de 536 árvores. A análise financeira demonstrou que o retrofit é vantajoso com índice benefício/custo de 0,60 e payback de 14,85 anos. Conclui-se que um ano após a execução da obra de retrofit foi atingido o objetivo esperado, que era substituir o sistema de ar condicionado antigo por um

  7. Implementation of new concepts for space HVAC systems in domestic buildings in consideration of cost, consumption and user comfort. Final report; Umsetzung neuer Konzepte der technischen Gebaeudeausruestung im Wohnungsbau unter Beruecksichtigung von Kosten, Verbraeuchen und Nutzerkomfort. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F.; Sucic, D.; Wendler, M.

    1998-03-01

    The goal of this project was the development of a set of tools for the selection of optimal concepts for HVAC-systems in housing buildings. Several factors are considered. They include technical feasibility, costs for investment, maintenance and operation, energy concumption, environmental impacts and user comfort. It is intended with the help of these tools to identify the most important factors which influence energy consumption and to suggest simple and cost effective measures to reduce energy consumption. Measures include improvements of the envelope, changes in the HVAC-system and its operation according to the needs to the inhabitants of the building. This report describes these components of this tool set which were developed in the frame of the project WohnKomfort. It lists data and rules chosen. In addition we report experiences which we gained with an prototypical implementation. This implementation allows load calculations for more than 60.000 different buildings applying EN 802 (only one zone model) as calculation method. It also supports selection of heating systems for such buildings by offering an evaluation according to user specified criteria including cost, environment and comfort. (orig./MM) [Deutsch] Ziel des Vorhabens war die Entwicklung eines Instrumentariums zur Auswahl optimaler Konzepte fuer technische Anlagen in Wohngebaeuden unter Beruecksichtigung der Faktoren technische Machbarkeit, Erstellungs-, Betriebskosten, Energieverbrauch, Umweltbelastung und Nutzerkomfort. Mit Hilfe dieses Instrumentariums soll es moeglich werden, die Haupteinflussfaktoren fuer den Energieverbrauch anzugeben und Vorschlaege fuer einfache und kostenguenstige Massnahmen zu seiner Reduzierung auf der Seite des Gebaeudes (bauliche Massnahmen) und der Anlage (technische Massnahmen, Nutzerverhalten) anzugeben. In diesem Bericht beschreiben wir die im Vorhaben entwickelten Komponenten des Instrumentariums, die zugrundeliegenden Daten und Regeln sowie Erfahrungen, die

  8. Nike Facility Diagnostics and Data Acquisition System

    Science.gov (United States)

    Chan, Yung; Aglitskiy, Yefim; Karasik, Max; Kehne, David; Obenschain, Steve; Oh, Jaechul; Serlin, Victor; Weaver, Jim

    2013-10-01

    The Nike laser-target facility is a 56-beam krypton fluoride system that can deliver 2 to 3 kJ of laser energy at 248 nm onto targets inside a two meter diameter vacuum chamber. Nike is used to study physics and technology issues related to laser direct-drive ICF fusion, including hydrodynamic and laser-plasma instabilities, material behavior at extreme pressures, and optical and x-ray diagnostics for laser-heated targets. A suite of laser and target diagnostics are fielded on the Nike facility, including high-speed, high-resolution x-ray and visible imaging cameras, spectrometers and photo-detectors. A centrally-controlled, distributed computerized data acquisition system provides robust data management and near real-time analysis feedback capability during target shots. Work supported by DOE/NNSA.

  9. Saturn facility oil transfer automation system

    Energy Technology Data Exchange (ETDEWEB)

    Joseph, Nathan R.; Thomas, Rayburn Dean; Lewis, Barbara Ann; Malagon, Hector Ricardo.

    2014-02-01

    The Saturn accelerator, owned by Sandia National Laboratories, has been in operation since the early 1980s and still has many of the original systems. A critical legacy system is the oil transfer system which transfers 250,000 gallons of transformer oil from outside storage tanks to the Saturn facility. The oil transfer system was iden- ti ed for upgrade to current technology standards. Using the existing valves, pumps, and relay controls, the system was automated using the National Instruments cRIO FGPA platform. Engineered safety practices, including a failure mode e ects analysis, were used to develop error handling requirements. The uniqueness of the Saturn Oil Automated Transfer System (SOATS) is in the graphical user interface. The SOATS uses an HTML interface to communicate to the cRIO, creating a platform independent control system. The SOATS was commissioned in April 2013.

  10. Monitoring System with Two Central Facilities Protocol

    Directory of Open Access Journals (Sweden)

    Caesar Firdaus

    2017-03-01

    Full Text Available The security of data and information on government’s information system required proper way of defending against threat. Security aspect can be achieved by using cryptography algorithm, applying information hiding concept, and implementing security protocol. In this research, two central facilities protocol was implemented on Research and Development Center of Mineral and Coal Technology’s Cooperation Contract Monitoring System by utilizing AES and whitespace manipulation algorithm. Adjustment on the protocol by creating several rule of validation ID’s generation and checking processes could fulfill two of four cryptography objectives, consist of authentication and non-repudiation. The solid collaboration between central legitimization agency (CLA, central tabulating facility (CTF, and client is the main idea in two central facilities protocol. The utilization of AES algorithm could defend the data on transmission from man in the middle attack scenario. On the other hand, whitespace manipulation algorithm provided data integrity aspect of the document that is uploaded to the system itself. Both of the algorithm fulfill confidentiality, data integrity, and authentication.

  11. HVAC--the importance of clean intake section and dry air filter in cold climate.

    Science.gov (United States)

    Hanssen, S O

    2004-01-01

    HVAC systems, if properly designed, installed, operated and maintained, will improve thermal conditions and air quality indoors. However, the success strongly depends on the design of the system and the quality of the components we use in our HVAC installations. Regrettably, several investigations have revealed that many HVAC installations have a lot of operational and maintenance problems, especially related to moisture, rain and snow entrainment. In short, it seems that too little attention is placed on the design of the intake section, despite the fact that there exists a large number of national and international guidelines and recommendations. This is a serious problem because the air intake is the initial component of the ventilation plant and as such the first line of defense against debris and other outdoor air pollutants. Unfortunately, the design is often an argued compromise between the architect, the civil engineer and the HVAC engineer. In the future, the technical, hygienic and microbiological feature of air intakes must be better ensured in order to avoid the air intake becoming a risk component as regards contamination and indoor air quality. Further, it seems that the magnitude of the problem is not well known, or recognized, by the building designers, engineers and professionals involved in the construction and operation of buildings. This fact needs to be addressed more seriously, because obviously there is a big difference between the idealistic architectonic design, engineering intentions and the real life situation. Several practical recommendations for design and operation of HVAC systems are presented. Following the recommendations will result in less pollution from the HVAC-system and increased indoor environmental quality.

  12. Support systems of the orbiting quarantine facility

    Science.gov (United States)

    The physical support systems, the personnel management structure, and the contingency systems necessary to permit the Orbiting Quarantine Facility (OQF) to function as an integrated system are described. The interactions between the subsystems within the preassembled modules are illustrated. The Power Module generates and distributes electrical power throughout each of the four modules, stabilizes the OQF's attitude, and dissipates heat generated throughout the system. The Habitation Module is a multifunctional structure designed to monitor and control all aspects of the system's activities. The Logistics Module stores the supplies needed for 30 days of operation and provides storage for waste materials generated during the mission. The Laboratory Module contains the equipment necessary for executing the protocol, as well as an independent life support system.

  13. Residential and Light Commercial HVAC. Teacher Edition.

    Science.gov (United States)

    Stephenson, David; Fulkerson, Dan, Ed.

    This curriculum guide contains 18 units of instruction for a competency-based course in residential and light commercial heating, ventilating, and air conditioning (HVAC). Introductory materials include a competency profile and an instructional/task analysis that correlates job training with related information for this course. Each instructional…

  14. Test Facility For Thermal Imaging Systems

    Science.gov (United States)

    Fontanella, Jean-Claude

    1981-10-01

    The test facility is designed to measure the main performances of thermal imaging systems : optical transfer function, minimum resolvable thermal difference, noise equivalent temperature difference and spectral response. The infrared sources are slits, MRTD four bar patterns or the output slit of a monochromator which are placed in the focal plane of two collimators. The response of the system can be measured either on the display using a photometer or in the video signal using a transient recorder. Most of the measurements are controlled by a minicomputer. Typical results are presented.

  15. HVAC in sustainable office buildings a bridge between owners and engineers

    CERN Document Server

    Hovorka, Frank; Kurnitski, Jarek; Litiu, Andrei

    2012-01-01

    This guidebook aims to build a bridge between the real estate community and the engineering community. It explains the challenges of property valuation based on real data and how the sustainability and HVAC-technology can have an impact on value. It also gathers the latest HVAC- and other technologies used in sustainable buildings and gives some real case study examples. But maybe the most important part in terms of improved communication between the owners and engineers is the list of questions to be asked during the life time of a building. It is impossible to give all the right answers in this guidebook, but we will raise some pertinent questions. As climates and cultures are different, as well as existing building types and energy production, the same solutions do not solve problems universally. This guidebook is aimed for the owners and architects as well as engineers. It doesn’t require deep technical knowhow of HVAC-systems or real estate valuation.

  16. Energy Renovations: Volume 14: HVAC - A Guide for Contractors to Share with Homeowners

    Energy Technology Data Exchange (ETDEWEB)

    Gilbride, Theresa L.; Baechler, Michael C.; Hefty, Marye G.; Hand, James R.; Love, Pat M.

    2011-08-29

    This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various energy-efficient options for heating, cooling, and ventilating existing homes. The report provides descriptions of many common and not-so-common HVAC systems, including their advantages and disadvantages, efficiency ranges and characteristics of high-performance models, typical costs, and climate considerations. The report also provides decision trees and tables of useful information for homeowners who are making decisions about adding, replacing, or upgrading existing HVAC equipment in their homes. Information regarding home energy performance assessments (audits) and combustion safety issues when replacing HVAC equipment are also provided.

  17. Energy Savings Potential and RD&D Opportunities for Non-Vapor-Compression HVAC Technologies

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-03-01

    While vapor-compression technologies have served heating, ventilation, and air-conditioning (HVAC) needs very effectively, and have been the dominant HVAC technology for close to 100 years, the conventional refrigerants used in vapor-compression equipment contribute to global climate change when released to the atmosphere. This Building Technologies Office report: --Identifies alternatives to vapor-compression technology in residential and commercial HVAC applications --Characterizes these technologies based on their technical energy savings potential, development status, non-energy benefits, and other factors affecting end-user acceptance and their ability to compete with conventional vapor-compression systems --Makes specific research, development, and deployment (RD&D) recommendations to support further development of these technologies, should DOE choose to support non-vapor-compression technology further.

  18. DISAIN SISTEM KENDALI MESIN AIR LEAK TEST MENGGUNAKAN SISTEM KENDALI PLC OMRON CJ2M DI HVAC (HEATING, VENTILATING, AND AIR CONDITIONING LINE 6

    Directory of Open Access Journals (Sweden)

    Syahril Ardi

    2015-03-01

    Full Text Available Pada proses produksi pembuatan komponen HVAC (Heating, Ventilating, and Air Conditioning dari perusahaan manufaktur di Indonesia, memerlukan proses pengecekan kebocoran pada bagian HVAC. Proses pengecekan ini dilakukan untuk memastikan tidak ada komponen HVAC yang bocor sebelum dikirim ke pihak pelanggan. Penelitian ini dilakukan untuk membuat system dan alat air leak test. Mesin air leak test ini menggunakan prinsip kerja differential pressure air leak test, yaitu metode yang membandingkan antara tekanan udara yang diberikan ke produk dan master produk. Pada penelitian ini, kami membuat disain mesin air leak test menggunakan sistem kendali berupa air leak tester, PLC, dan HMI. Berdasarkan kondisi dengan kapasitas produksi yang meningkat karena bertambahnya permintaan dari customer, dapat ditanggulangi dengan adanya share loading produksi dari HVAC line 4 ke line baru, yaitu HVAC line 6. Hasil yang didapat dari pengujian deteksi kebocoran produk,didapat nilai parameter kebocoran produk sebesar 2.23 ml/min.

  19. Testing of blowers and HVAC systems. Guide for energy optimization regarding ambient air ventilation systems. Pruefungen von Ventilatoren und Raumlufttechnischen Geraeten. Wegweiser zur Energieoptimierung bei RLT-Geraeten

    Energy Technology Data Exchange (ETDEWEB)

    Breit, O.

    1992-09-01

    Through a continuously increasing environmental consciousness and the increase of energy cost to be expected in the next years, ambient air ventilation systems with an optimized energy consumption are increasingly applied. For the determination of the energy consumption, special test rigs for the capacity are necessary. They consist of two climatic chambers arranged side by side, two measured sections and two speed controlled supporting fans. The tests carried out on the capacity and function of ambient air ventilation systems showed that the power consumption and thus, the energy consumption can be considerably reduced through constructional changes and an exact design of single components based on measured results. (BWI).

  20. INDICTORS OF RESTORATION OF PROGRAM FACILITY OF MECHATRONICS SYSTEM

    Directory of Open Access Journals (Sweden)

    V. Frolov

    2009-01-01

    Full Text Available The determination of reliability indictors of program facilities of mechatronic systems are offered. The defaillance modes of program facilities are represent. A short review of model reliability of program facility is presented. The indictors of restoration, their mathematical determinations and application for the characteristics of program facility restoration are offered.

  1. INDICTORS OF RESTORATION OF PROGRAM FACILITY OF MECHATRONICS SYSTEM

    OpenAIRE

    Frolov, V.

    2009-01-01

    The determination of reliability indictors of program facilities of mechatronic systems are offered. The defaillance modes of program facilities are represent. A short review of model reliability of program facility is presented. The indictors of restoration, their mathematical determinations and application for the characteristics of program facility restoration are offered.

  2. Introduction to Heating, Ventilation and Air Conditioning (HVAC). Introduction to Construction Series. Instructor Edition.

    Science.gov (United States)

    Associated General Contractors of America, Washington, DC.

    This module on introductory heating, ventilating, and air conditioning (HVAC) is one of a series of modules designed to teach basic skills necessary for entry-level employment in this field. The module contains four instructional units that cover the following topics: (1) HVAC materials; (2) HVAC tools; (3) HVAC layout; and (4) HVAC basic skills.…

  3. Introduction to Heating, Ventilation and Air Conditioning (HVAC). Introduction to Construction Series. Instructor Edition.

    Science.gov (United States)

    Associated General Contractors of America, Washington, DC.

    This module on introductory heating, ventilating, and air conditioning (HVAC) is one of a series of modules designed to teach basic skills necessary for entry-level employment in this field. The module contains four instructional units that cover the following topics: (1) HVAC materials; (2) HVAC tools; (3) HVAC layout; and (4) HVAC basic skills.…

  4. Engineering Challenges for Closed Ecological System facilities

    Science.gov (United States)

    Dempster, William; Nelson, Mark; Allen, John P.

    2012-07-01

    Engineering challenges for closed ecological systems include methods of achieving closure for structures of different materials, and developing methods of allowing energy (for heating and cooling) and information transfer through the materially closed structure. Methods of calculating degree of closure include measuring degradation rates of inert trace gases introduced into the system. An allied problem is developing means of locating where leaks are located so that they may be repaired and degree of closure maintained. Once closure is achieved, methods of dealing with the pressure differentials between inside and outside are needed: from inflatable structures which might adjust to the pressure difference to variable volume chambers attached to the life systems component. These issues are illustrated through the engineering employed at Biosphere 2, the Biosphere 2 Test Module and the Laboratory Biosphere and a discussion of methods used by other closed ecological system facility engineers. Ecological challenges include being able to handle faster cycling rates and accentuated daily and seasonal fluxes of critical life elements such as carbon dioxide, oxygen, water, macro- and mico-nutrients. The problems of achieving sustainability in closed systems for life support include how to handle atmospheric dynamics including trace gases, producing a complete human diet and recycling nutrients and maintaining soil fertility, healthy air and water and preventing the loss of crucial elements from active circulation. In biospheric facilities the challenge is also to produce analogue to natural biomes and ecosystems, studying processes of self-organization and adaptation in systems that allow specification or determination of state variables and cycles which may be followed through all interactions from atmosphere to soils.

  5. Controls system developments for the ERL facility

    Energy Technology Data Exchange (ETDEWEB)

    Jamilkowski, J.; Altinbas, Z.; Gassner, D.; Hoff, L.; Kankiya, P.; Kayran, D.; Miller, T.; Olsen, R.; Sheehy, B.; Xu, W.

    2011-10-07

    The BNL Energy Recovery LINAC (ERL) is a high beam current, superconducting RF electron accelerator that is being commissioned to serve as a research and development prototype for a RHIC facility upgrade for electron-ion collision (eRHIC). Key components of the machine include a laser, photocathode, and 5-cell superconducting RF cavity operating at a frequency of 703 MHz. Starting with a foundation based on existing ADO software running on Linux servers and on the VME/VxWorks platforms developed for RHIC, we are developing a controls system that incorporates a wide range of hardware I/O interfaces that are needed for machine R&D. Details of the system layout, specifications, and user interfaces are provided.

  6. National transonic facility Mach number system

    Science.gov (United States)

    Kern, F. A.; Knight, C. W.; Zasimowich, R. F.

    1985-01-01

    The Mach number system for the Langley Research Center's National Transonic Facility was designed to measure pressures to determine Mach number to within + or - 0.002. Nine calibration laboratory type fused quartz gages, four different range gages for the total pressure measurement, and five different range gages for the static pressure measurement were used to satisfy the accuracy requirement over the 103,000-890,000 Pa total pressure range of the tunnel. The system which has been in operation for over 1 year is controlled by a programmable data process controller to select, through the operation of solenoid valves, the proper range fused quartz gage to maximize the measurement accuracy. The pressure gage's analog outputs are digitized by the process controller and transmitted to the main computer for Mach number computation. An automatic two-point on-line calibration of the nine quartz gages is provided using a high accuracy mercury manometer.

  7. IFC HVAC interface to EnergyPlus - A case of expanded interoperability for energy simulation

    Energy Technology Data Exchange (ETDEWEB)

    Bazjanac, Vladimir; Maile, Tobias

    2004-03-29

    Tedious manual input of data that define a building, its systems and its expected pattern of use and operating schedules for building energy performance simulation has in the past diverted time and resources from productive simulation runs. In addition to its previously released IFCtoIDF utility that semiautomates the import of building geometry, the new IFC HVAC interface to EnergyPlus (released at the end of 2003) makes it possible to import and export most of the data that define HVAC equipment and systems in a building directly from and to other IFC compatible software tools. This reduces the manual input of other data needed for successful simulation with EnergyPlus to a minimum. The main purpose of this new interface is to enable import of HVAC equipment and systems definitions, generated by other IFC compatible software tools (such as HVAC systems design tools) and data bases, into EnergyPlus, and to write such definitions contained in EnergyPlus input files to the original IFC files from which building geometry was extracted for the particular EnergyPlus input. In addition, this interface sets an example for developers of other software tools how to import and/or export data other than building geometry from and/or into EnergyPlus. This paper describes the necessary simplifications and shortcuts incorporated in this interface, its operating environment, interface architecture, and the basic conditions and methodology for its use with EnergyPlus.

  8. Estimating the HVAC energy consumption of plug-in electric vehicles

    Science.gov (United States)

    Kambly, Kiran R.; Bradley, Thomas H.

    2014-08-01

    Plug in electric vehicles are vehicles that use energy from the electric grid to provide tractive and accessory power to the vehicle. Due to the limited specific energy of energy storage systems, the energy requirements of heating, ventilation, and air conditioning (HVAC) systems for cabin conditioning can significantly reduce their range between charges. Factors such as local ambient temperature, local solar radiation, local humidity, length of the trip and thermal soak have been identified as primary drivers of cabin conditioning loads and therefore of vehicle range. The objective of this paper is to develop a detailed systems-level approach to connect HVAC technologies and usage conditions to consumer-centric metrics of vehicle performance including energy consumption and range. This includes consideration of stochastic and transient inputs to the HVAC energy consumption model including local weather, solar loads, driving behavior, charging behavior, and regional passenger fleet population. The resulting engineering toolset is used to determine the summation of and geographical distribution of energy consumption by HVAC systems in electric vehicles, and to identify regions of US where the distributions of electric vehicle range are particularly sensitive to climate.

  9. Key ecological challenges for closed systems facilities

    Science.gov (United States)

    Nelson, Mark; Dempster, William F.; Allen, John P.

    2013-07-01

    Closed ecological systems are desirable for a number of purposes. In space life support systems, material closure allows precious life-supporting resources to be kept inside and recycled. Closure in small biospheric systems facilitates detailed measurement of global ecological processes and biogeochemical cycles. Closed testbeds facilitate research topics which require isolation from the outside (e.g. genetically modified organisms; radioisotopes) so their ecological interactions and fluxes can be studied separate from interactions with the outside environment. But to achieve and maintain closure entails solving complex ecological challenges. These challenges include being able to handle faster cycling rates and accentuated daily and seasonal fluxes of critical life elements such as carbon dioxide, oxygen, water, macro- and mico-nutrients. The problems of achieving sustainability in closed systems for life support include how to handle atmospheric dynamics including trace gases, producing a complete human diet, recycling nutrients and maintaining soil fertility, the maintenance of healthy air and water and preventing the loss of critical elements from active circulation. In biospheric facilities, the challenge is also to produce analogues to natural biomes and ecosystems, studying processes of self-organization and adaptation in systems that allow specification or determination of state variables and cycles which may be followed through all interactions from atmosphere to soils. Other challenges include the dynamics and genetics of small populations, the psychological challenges for small isolated human groups and backup technologies and strategic options which may be necessary to ensure long-term operation of closed ecological systems.

  10. The state of HVAC in Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, M.M. [Air Quality Systems, Shawnee Mission, KS (United States)

    1997-07-01

    With the chartering of the Manual de Anda ASHRAE Chapter in Mexico City, the first chapter in Latin America, and with increasing cross-border trade and investment as a result of NAFTA, it`s important for US and Canadian engineers to understand the state of HVAC technology in Mexico. The goal of this article is to introduce the reader to some industry leaders in Mexico and to show their creative design and installation expertise by reviewing some recent projects.

  11. Facility information management system; Shisetsu joho kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-10

    A facility management system (FMS) was developed as a tool for efficiently operating and managing building facilities and related equipment. The maintenance management data is designed to be collected through automatic formation of data base by using a work flow function and releasing the daily business from paper work. The data base thus formed can be retrieved and displayed by utilizing a network system. The plan view for construction facilities is made a minute plan comparable to the ground plan by taking in DXF type drawing data such as a completion drawing, making it a colored display for example to create an intuitive expression understandable at first sight. The plan is controlled by the level including equipment classification and is capable of superimposed display. Detailed management data is displayed by mouse clicking of registered icons, allowing required information to be readily taken out. (translated by NEDO)

  12. Electrostatic MEMS vibration energy harvester for HVAC applications

    Science.gov (United States)

    Oxaal, J.; Hella, M.; Borca-Tasciuc, D.-A.

    2015-12-01

    This paper reports on an electrostatic MEMS vibration energy harvester with gapclosing interdigitated electrodes, designed for and tested on HVAC air ducts. The device is fabricated on SOI wafers using a custom microfabrication process. A dual-level physical stopper system is implemented in order to control the minimum gap between the electrodes and maximize the power output. It utilizes cantilever beams to absorb a portion of the impact energy as the electrodes approach the impact point, and a film of parylene with nanometer thickness deposited on the electrode sidewalls, which defines the absolute minimum gap and provides electrical insulation. The fabricated device was first tested on a vibration shaker to characterize its resonant behavior. The device exhibits spring hardening behavior due to impacts with the stoppers and spring softening behavior with increasing voltage bias. Testing was carried out on HVAC air duct vibrating with an RMS acceleration of 155 mgRMS and a primary frequency of 60 Hz with a PSD of 7.15·10-2 g2/Hz. The peak power measured is 12nW (0.6 nW RMS) with a PSD of 6.9·10-11 W/Hz at 240 Hz (four times of the primary frequency of 60 Hz), which is the highest output reported for similar vibration conditions and biasing voltages.

  13. Automation and control of the MMT thermal system

    Science.gov (United States)

    Gibson, J. D.; Porter, Dallan; Goble, William

    2016-07-01

    This study investigates the software automation and control framework for the MMT thermal system. Thermal-related effects on observing and telescope behavior have been considered during the entire software development process. Regression analysis of telescope and observatory subsystem data is used to characterize and model these thermal-related effects. The regression models help predict expected changes in focus and overall astronomical seeing that result from temperature variations within the telescope structure, within the primary mirror glass, and between the primary mirror glass and adjacent air (i.e., mirror seeing). This discussion is followed by a description of ongoing upgrades to the heating, ventilation and air conditioning (HVAC) system and the associated software controls. The improvements of the MMT thermal system have two objectives: 1) to provide air conditioning capabilities for the MMT facilities, and 2) to modernize and enhance the primary mirror (M1) ventilation system. The HVAC upgrade necessitates changes to the automation and control of the M1 ventilation system. The revised control system must factor in the additional requirements of the HVAC system, while still optimizing performance of the M1 ventilation system and the M1's optical behavior. An industry-standard HVAC communication and networking protocol, BACnet (Building Automation and Control network), has been adopted. Integration of the BACnet protocol into the existing software framework at the MMT is discussed. Performance of the existing automated system is evaluated and a preliminary upgraded automated control system is presented. Finally, user interfaces to the new HVAC system are discussed.

  14. Ventilation system design for educational facilities

    Energy Technology Data Exchange (ETDEWEB)

    Elsafty, A.F.; Abo Elazm, M.M. [Arab Academy for Science, Alexandria (Egypt). Technology and Maritime Transport; Safwan, M. [Arab Academy for Science, Cairo (Egypt). Technology and Maritime Transport

    2010-07-01

    In order to maintain acceptable indoor air quality levels in classrooms, high ventilation rates are needed to dilute the concentration of indoor contaminants, resulting in higher energy consumption for the operation of mechanical ventilation systems. Three factors are usually considered when determining the adequate ventilation rate for classrooms in educational facilities. These include the maximum population served in the classroom; carbon dioxide (CO{sub 2}) production rate by occupants; and outdoor air conditions. CO{sub 2} concentrations usually indicate the rate of ventilation required. This paper presented a newly developed computer software program for determining the ventilation rates needed to enhance indoor air quality and to maintain CO{sub 2} concentration within the recommended levels by ANSI/ASHRAE standards for best student performance. This paper also presented design curves for determining the ventilation rates and air changes per hour required for the ventilated educational zone. 15 refs., 2 tabs., 5 figs.

  15. HVAC Equipment Design Options for Near-Zero-Energy Homes (NZEH) -A Stage 2 Scoping Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, Van D [ORNL

    2005-11-01

    Although the energy efficiency of heating, ventilating, and air-conditioning (HVAC) equipment has increased substantially in recent years, new approaches are needed to continue this trend. Conventional unitary equipment and system designs have matured to a point where cost-effective, dramatic efficiency improvements that meet near-zero-energy housing (NZEH) goals require a radical rethinking of opportunities to improve system performance. The large reductions in HVAC energy consumption necessary to support the NZEH goals require a systems-oriented analysis approach that characterizes each element of energy consumption, identifies alternatives, and determines the most cost-effective combination of options. In particular, HVAC equipment must be developed that addresses the range of special needs of NZEH applications in the areas of reduced HVAC and water heating energy use, humidity control, ventilation, uniform comfort, and ease of zoning. This report describes results of a scoping assessment of HVAC system options for NZEH homes. ORNL has completed a preliminary adaptation, for consideration by The U.S. Department of Energy, Energy Efficiency and Renewable Energy Office, Building Technologies (BT) Program, of Cooper's (2001) stage and gate planning process to the HVAC and Water Heating element of BT's multi-year plan, as illustrated in Figure 1. In order to adapt to R&D the Cooper process, which is focused on product development, and to keep the technology development process consistent with an appropriate role for the federal government, the number and content of the stages and gates needed to be modified. The potential federal role in technology development involves 6 stages and 7 gates, but depending on the nature and status of the concept, some or all of the responsibilities can flow to the private sector for product development beginning as early as Gate 3. In the proposed new technology development stage and gate sequence, the Stage 2 &apos

  16. Evaluating performance indices of a shopping centre and implementing HVAC control principles to minimize energy usage

    Energy Technology Data Exchange (ETDEWEB)

    Canbay, C.S. [Energy Engineering Programme, Izmir Institute of Technology, Izmir (Turkey); Hepbasli, A. [Faculty of Engineering, Mechanical Engineering Department, Ege University, Izmir (Turkey); Gokcen, G. [Faculty of Engineering, Mechanical Engineering Department, Izmir Institute of Technology, Izmir (Turkey)

    2004-07-01

    Heating, ventilation and air-conditioning (HVAC) systems in buildings must be integrated with an efficient control scheme to maintain comfort under any load conditions. Efficient HVAC control is often the most cost-effective option to improve the energy efficiency of a building. However, HVAC processes are non-linear, and characteristics change on a seasonal basis, so the effect of changing the control strategy is usually difficult to predict. The present study aims to reduce energy consumption by defining new HVAC control strategies and tuning control loops in a shopping centre. First, an energy audit was performed to investigate the potential for energy savings and to redefine the control scenarios, while a methodology for the shopping centre was developed. Performance indices were then calculated and compared with the yardsticks. Next, normalised performance indices were computed to reach out a better understanding of the building's efficiency. Finally, new strategies were implemented with the help of the existing building management system (BMS) and about 22% of energy saving was achieved. (author)

  17. A Novel Method for Saving Energy of HVAC Using Autonomous Variable Air Velocity Based On Thermal Comfort

    Science.gov (United States)

    Auttawaitkul, Yingrak; Therdyothin, Apichit; Monyakul, Veerapol

    The tower building categories used in the energy breakdown are Electric lighting, the heating, ventilating, and air conditioning (HVAC) auxiliary and Office equipment. The HVAC system has the greatest energy saving potential as it is the major energy consumer. It consumes approximately 64 percent of the total building energy. A good HVAC in buildings helps reduce energy use and maintain occupant comfort. To this end, there are many systems and equipment conditions to observe HVAC systems. This paper critically examines indoor climate control technologies to reduce the HVAC system energy. The autonomous variable air volume diffusers are interconnected to simulate the responses of the system. The constrained optimal control problem is formulated and solved for increased operative temperature. The experiment results show that by increasing the operative temperature from 25°C to 27°C, the electrical energy can be saved by 11.64 percent. The proposed method feeds back the output air to input boundary conditions of the same human thermal sensation even though the air velocity distributions in the sections are different from each other. The experiment results also show that the proposed method can maintain the PMV values in an interval of -0.5 to +0.5 at an acceptable air velocity range.

  18. Telerobotics and Systems Engineering for Scientific Facilities Editorial

    Directory of Open Access Journals (Sweden)

    Manuel Ferre

    2014-11-01

    Full Text Available This special issue is focused on promoting telerobotic remote handling technologies integrated with system engineering. Integration matters are particularly relevant in scientific facilities such as CERN (European Organization for Nuclear Research, GSI-FAIR (Facility for Antiproton and Ion Research, JET (Joint European Torus and ITER (International Thermonuclear Experimental Reactor, where the complexity of these facilities require top-down analysis.

  19. Region 9 National Pollution Discharge Elimination System (NPDES) Facilities

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  20. Strategy Guideline. HVAC Equipment Sizing

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS, Inc., Pittsburgh, PA (United States)

    2012-02-01

    This guide describes the equipment selection of a split system air conditioner and furnace for an example house in Chicago, IL as well as a heat pump system for an example house in Orlando, FL. The required heating and cooling load information for the two example houses was developed in the Department of Energy Building America Strategy Guideline: Accurate Heating and Cooling Load Calculations.

  1. VARIABLE SPEED INTEGRATED INTELLIGENT HVAC BLOWER

    Energy Technology Data Exchange (ETDEWEB)

    Herman Wiegman; Charlie Stephens; Xiaoyue Liu; Ralph Carl; Sunny Zhuang; Paul Szczesny; Kamron Wright

    2003-09-23

    This comprehensive topical report discusses the key findings in the development of an advanced blower for HVAC applications. The benefits of rearward inclined blades over that of traditional forward inclined blades is well documented, and several prototype wheels are demonstrated in various housings. A comparison of retrofitted blowers to that of three typical units from the industry is presented. The design and modification of the blower housing is addressed and the impact of size limitations on static efficiency is discussed. The roadmap to rearward-inclined wheel technology insertion is presented and typical static efficiency gains are documented.

  2. State of the Art of HVAC Technology in Europe and America

    DEFF Research Database (Denmark)

    Olesen, Bjarne W.; Kazanci, Ongun Berk

    2015-01-01

    for increasing the energy efficiency of HVAC (heating, ventilation and air-conditioning) systems and for increasing the amount of renewable energy used. Especially these types of systems are getting increasing attention in Europe and North-America. In the present study, operation characteristics, possibilities...... mechanisms and media to emit and remove heat or moisture from indoor spaces (e.g. hydronic radiant heating and cooling systems, fan-coil units, and active beams). The main differences between HVAC systems in Europe, North America and other parts of the world are often the indoor terminal units. Type...... of energy sources and energy generators are very much similar. This paper will present state-of the art-off energy efficient systems that will provide a good indoor environmental quality at a decreased energy use. Low Temperature Heating and High Temperature Cooling systems are an important requirement...

  3. Exergy analysis of scroll compressors working with R22, R407C, and R417A as refrigerant for HVAC system

    Directory of Open Access Journals (Sweden)

    Kalaiselvam Sivakumar

    2009-01-01

    Full Text Available The rise in crisis of power enthralls the world economically and the options for conventional and non-conventional energy resources have been searched out. No system exists in this world with 100% efficiency due to several irreversibility's. If the output obtained from the system is maximum for a given input, maximum amount of energy can be saved globally. To understand the thermodynamic losses occurring in the system and to predict the available energy that can be tapped from the system, exergy plays a major role. Experimental study on exergy in a system can pave the way to understand the complete behavior of the system exergually. Conceptually exergy studies are based on simulation, to provide a new dimension to the concept of exergy experimental validation have been promoted. The analogy of exergy analysis of three refrigerants working in scroll compressors and their exergual features are explained in this paper. The refrigerants R22, R417A, and R407C and their thermo dynamical behavior, irreversibility were experimented in an air conditioning system with three scroll compressors, interaction between the system and the refrigerant in terms of pressure drop and heat transfer, friction has been implemented for the calculation of exergy. The entire system performance on the basis of refrigerant is validated in each part of the air conditioning system. The resultant coefficient of performance of R407C is 2.41% less than R22 in a R22 designed scroll compressor with minimal exergy losses. The second law efficiency of 50 to 55% obtained in R22 has fewer rules over R407C and R417A which has 48 to 52%. The diminutive deviation of results encourages R417A refrigerant to be used as a substitute for R22. Thus the exergual prediction of performance of refrigerant and second law efficiency can identify the use of eco-friendly refrigerant in scroll compressor.

  4. Energy Systems Integration Facility (ESIF): Facility Stewardship Plan, Revision 2.0

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Art [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hannegan, Bryan [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy, has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-sq. ft. research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan serves to provide DOE and other decision makers with information on the existing and expected capabilities of ESIF, and the expected performance metrics to be applied to ESIF operations. This Plan is a living document that will be updated and refined throughout the lifetime of the facility.

  5. Industrial energy systems and assessment opportunities

    Science.gov (United States)

    Barringer, Frank Leonard, III

    Industrial energy assessments are performed primarily to increase energy system efficiency and reduce energy costs in industrial facilities. The most common energy systems are lighting, compressed air, steam, process heating, HVAC, pumping, and fan systems, and these systems are described in this document. ASME has produced energy assessment standards for four energy systems, and these systems include compressed air, steam, process heating, and pumping systems. ASHRAE has produced an energy assessment standard for HVAC systems. Software tools for energy systems were developed for the DOE, and there are software tools for almost all of the most common energy systems. The software tools are AIRMaster+ and LogTool for compressed air systems, SSAT and 3E Plus for steam systems, PHAST and 3E Plus for process heating systems, eQUEST for HVAC systems, PSAT for pumping systems, and FSAT for fan systems. The recommended assessment procedures described in this thesis are used to set up an energy assessment for an industrial facility, collect energy system data, and analyze the energy system data. The assessment recommendations (ARs) are opportunities to increase efficiency and reduce energy consumption for energy systems. A set of recommended assessment procedures and recommended assessment opportunities are presented for each of the most common energy systems. There are many assessment opportunities for industrial facilities, and this thesis describes forty-three ARs for the seven different energy systems. There are seven ARs for lighting systems, ten ARs for compressed air systems, eight ARs for boiler and steam systems, four ARs for process heating systems, six ARs for HVAC systems, and four ARs for both pumping and fan systems. Based on a history of past assessments, average potential energy savings and typical implementation costs are shared in this thesis for most ARs. Implementing these ARs will increase efficiency and reduce energy consumption for energy systems in

  6. Information security management system planning for CBRN facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lenaeu, Joseph D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); O' Neil, Lori Ross [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leitch, Rosalyn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Glantz, Clifford S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Landine, Guy P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bryant, Janet L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lewis, John [National Nuclear Lab., Workington (United Kingdom); Mathers, Gemma [National Nuclear Lab., Workington (United Kingdom); Rodger, Robert [National Nuclear Lab., Workington (United Kingdom); Johnson, Christopher [National Nuclear Lab., Workington (United Kingdom)

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  7. The Effects of Set-Points and Dead-Bands of the HVAC System on the Energy Consumption and Occupant Thermal Comfort

    DEFF Research Database (Denmark)

    Kazanci, Ongun Berk; Olesen, Bjarne W.

    2013-01-01

    with a ground heat exchanger, a ground coupled heat pump, embedded pipes in the floor and in the ceiling, a ventilation system (mechanical and natural), a domestic hot water tank and photovoltaic/thermal panels on the roof. Preliminary evaluations showed that for Madrid, change of indoor set-point in cooling......A building is a complex system where many components interact with each other therefore the control system plays a key role regarding the energy consumption and the occupant thermal comfort. This study is concerned with a detached, one-storey, single family, energy-plus house. It is equipped...... on the effects of the set-points and dead-bands of different components on the energy consumption together with the occupant thermal comfort. Evaluations are carried out with TRNSYS for Copenhagen and Madrid in order to compare climatic effects....

  8. Comparison between design and actual energy performance of a HVAC-ground coupled heat pump system in cooling and heating operation

    Energy Technology Data Exchange (ETDEWEB)

    Magraner, T.; Quilis, S. [Energesis Ingenieria S.L., Ciudad Politecnica de la Innovacion, Camino de Vera s/n, 46022 Valencia (Spain); Montero, A. [Instituto de Ingenieria Energetica, Universidad Politecnica de Valencia, Camino de Vera s/n, 46022 Valencia (Spain); Urchueguia, J.F. [Instituto Universitario de Matematica Pura y Aplicada, Universidad Politecnica de Valencia, Camino de Vera s/n, 46022 Valencia (Spain)

    2010-09-15

    This work compares the experimental results obtained for the energy performance study of a ground coupled heat pump system with the design values predicted by means of standard methodology. The system energy performance of a monitored ground coupled heat pump system is calculated using the instantaneous measurements of temperature, flow and power consumption and these values are compared with the numerical predictions. These predictions are performed with the TRNSYS software tool following standard procedures taking the experimental thermal loads as input values. The main result of this work is that simulation results solely based on nominal heat pump capacities and performances overestimate the measured overall energy performance by a percentage between 15% and 20%. A sensitivity analysis of the simulation results to changes in percentage of its input parameters showed that the heat pump nominal coefficient of performance is the parameter that mostly affects the energy performance predictions. This analysis supports the idea that the discrepancies between experimental results and simulation outputs for this ground coupled system are mainly due to heat pump performance degradation for being used at partial load. An estimation of the impact of this effect in energy performance predictions reduces the discrepancies to values around 5%. (author)

  9. Towards energy efficient operation of Heating, Ventilation and Air Conditioning systems via advanced supervisory control design

    Science.gov (United States)

    Oswiecinska, A.; Hibbs, J.; Zajic, I.; Burnham, K. J.

    2015-11-01

    This paper presents conceptual control solution for reliable and energy efficient operation of heating, ventilation and air conditioning (HVAC) systems used in large volume building applications, e.g. warehouse facilities or exhibition centres. Advanced two-level scalable control solution, designed to extend capabilities of the existing low-level control strategies via remote internet connection, is presented. The high-level, supervisory controller is based on Model Predictive Control (MPC) architecture, which is the state-of-the-art for indoor climate control systems. The innovative approach benefits from using passive heating and cooling control strategies for reducing the HVAC system operational costs, while ensuring that required environmental conditions are met.

  10. Energy conservation in space HVAC systems. Improving specific blower performance with leaktight air ducts; Energieeinsparung in RLT-Anlagen. Verbesserung der spezifischen Ventilatorleistung mit dichteren Luftleitungen

    Energy Technology Data Exchange (ETDEWEB)

    Luft, J. [Lindab GmbH, Bargteheide (Germany)

    2005-07-01

    The 91 goals stated in the Energy Performance of Buildings Directive (EPBD) 2002/91 are implemented in German law by the Energy Conservation Ordinance and further standards and regulations. In the case of ventilation and air conditioning systems, DIN EN 13779 applies, in which a SFP (specific fan power) value is introduced. The contribution shows how leaktightness of air ducts will affect the SFP. (orig.)

  11. Management Information Control Systems for Educational Facility Construction Programs.

    Science.gov (United States)

    Halverson, Walter S.

    1989-01-01

    Describes a computerized management information control system for an educational facility construction program that allows access to more than 50 major system applications, using over 5,000 programs. (MLF)

  12. Intelligent nuclear material surveillance system for DUPIC facility

    Energy Technology Data Exchange (ETDEWEB)

    Song, D. Y.; Lee, S. Y.; Ha, J. H.; Go, W. I.; Kim, H. D. [KAERI, Taejon (Korea, Republic of)

    2003-07-01

    DUPIC Fuel Development Facility (DFDF) is the facility to fabricate CANDU-type fuel from spent PWR fuel material without any separation of fissile elements and fission products. Unattended continuous surveillance systems for safeguards of nuclear facility result in large amounts of image and radiation data, which require much time and effort to inspect. Therefore, it is necessary to develop system that automatically pinpoints and diagnoses the anomalies from data. In this regards, this paper presents a novel concept of the continuous surveillance system that integrates visual image and radiation data by the use of neural networks. This surveillance system is operating for safeguards of the DFDF in KAERI.

  13. HVAC system design for Beijing Chao-Yang Hospital%北京朝阳医院暖通空调系统设计

    Institute of Scientific and Technical Information of China (English)

    赵文成

    2013-01-01

    Combined with state-of-the-art medical processes, allocates ventilation and air conditioning systems rationally and determines the positive and negative pressure of different rooms, the pressure gradient of clean rooms and the air flow direction, providing a reliable guarantee against cross-infection within the hospital. The project constructs the first domestic clean respiratory intensive care unit (RICU), the chemical poisoning emergency treatment center and the emergency center with A, B. C three zones admissions and treatment mechanism. Expounds their ventilation and air conditioning design.%结合先进的医疗流程,合理配置了通风空调系统,明确设计了房间的正负压、净化房间的压力梯度及气流流向,为防止医院内交叉感染提供了可靠的保证.该工程设计建成了国内首个净化的RICU和化学中毒紧急救治中心,急救中心分成A,B,C三区接诊及救治,详细介绍了这些场所的通风空调设计.

  14. Improving performance of HVAC systems to reduce exposure to aerosolized infectious agents in buildings; recommendations to reduce risks posed by biological attacks.

    Science.gov (United States)

    Hitchcock, Penny J; Mair, Michael; Inglesby, Thomas V; Gross, Jonathan; Henderson, D A; O'Toole, Tara; Ahern-Seronde, Joa; Bahnfleth, William P; Brennan, Terry; Burroughs, H E Barney; Davidson, Cliff; Delp, William; Ensor, David S; Gomory, Ralph; Olsiewski, Paula; Samet, Jonathan M; Smith, William M; Streifel, Andrew J; White, Ronald H; Woods, James E

    2006-01-01

    The prospect of biological attacks is a growing strategic threat. Covert aerosol attacks inside a building are of particular concern. In the summer of 2005, the Center for Biosecurity of the University of Pittsburgh Medical Center convened a Working Group to determine what steps could be taken to reduce the risk of exposure of building occupants after an aerosol release of a biological weapon. The Working Group was composed of subject matter experts in air filtration, building ventilation and pressurization, air conditioning and air distribution, biosecurity, building design and operation, building decontamination and restoration, economics, medicine, public health, and public policy. The group focused on functions of the heating, ventilation, and air conditioning systems in commercial or public buildings that could reduce the risk of exposure to deleterious aerosols following biological attacks. The Working Group's recommendations for building owners are based on the use of currently available, off-the-shelf technologies. These recommendations are modest in expense and could be implemented immediately. It is also the Working Group's judgment that the commitment and stewardship of a lead government agency is essential to secure the necessary financial and human resources and to plan and build a comprehensive, effective program to reduce exposure to aerosolized infectious agents in buildings.

  15. Self-Correcting HVAC Controls Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  16. History Data Facility in the SLC control system

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.G.; White, G.R.

    1991-10-01

    Two major enhancements to the SLC History Data Facility are described separately. First the internal design and procedures used for saving and using long term history data. Second the user interface, facilities and application of the History Data Comparisons sub-system, which is used for analyzing and correlating two or more accelerator device histories.

  17. Systems analysis of a potential space manufacturing facility

    Science.gov (United States)

    Driggers, G. W.

    1977-01-01

    Results of a preliminary design study of the system elements comprising a manufacturing facility in earth orbit are presented. The elements discussed include cis-Lunar transportation, Lunar base, materials transport, factory, living facilities, construction support and energy supply. An evolutionary path of development, production and deployment is presented and step-wise interrelationships discussed.

  18. Total system hazards analysis for the western area demilitarization facility

    Science.gov (United States)

    Pape, R.; Mniszewski, K.; Swider, E.

    1984-08-01

    The results of a hazards analysis of the Western Area Demilitarization facility (WADF) at Hawthorne, Nevada are summarized. An overview of the WADF systems, the hazards analysis methodology that was applied, a general discussion of the fault tree analysis results, and a compilation of the conclusions and recommendations for each area of the facility are given.

  19. History Data Facility in the SLC control system

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.G.; White, G.R.

    1991-10-01

    Two major enhancements to the SLC History Data Facility are described separately. First the internal design and procedures used for saving and using long term history data. Second the user interface, facilities and application of the History Data Comparisons sub-system, which is used for analyzing and correlating two or more accelerator device histories.

  20. Smart HVAC Control in IoT: Energy Consumption Minimization with User Comfort Constraints

    Directory of Open Access Journals (Sweden)

    Jordi Serra

    2014-01-01

    of heating, ventilation, and air conditioning (HVAC systems in smart grids with variable energy price. To that end, first, we propose an energy scheduling method that minimizes the energy consumption cost for a particular time interval, taking into account the energy price and a set of comfort constraints, that is, a range of temperatures according to user’s preferences for a given room. Then, we propose an energy scheduler where the user may select to relax the temperature constraints to save more energy. Moreover, thanks to the IoT paradigm, the user may interact remotely with the HVAC control system. In particular, the user may decide remotely the temperature of comfort, while the temperature and energy consumption information is sent through Internet and displayed at the end user’s device. The proposed algorithms have been implemented in a real testbed, highlighting the potential gains that can be achieved in terms of both energy and cost.

  1. A Statistical Approach for Selecting Buildings for Experimental Measurement of HVAC Needs

    Directory of Open Access Journals (Sweden)

    Malinowski Paweł

    2017-03-01

    Full Text Available This article presents a statistical methodology for selecting representative buildings for experimentally evaluating the performance of HVAC systems, especially in terms of energy consumption. The proposed approach is based on the k-means method. The algorithm for this method is conceptually simple, allowing it to be easily implemented. The method can be applied to large quantities of data with unknown distributions. The method was tested using numerical experiments to determine the hourly, daily, and yearly heat values and the domestic hot water demands of residential buildings in Poland. Due to its simplicity, the proposed approach is very promising for use in engineering applications and is applicable to testing the performance of many HVAC systems.

  2. Practical Study on HVAC Control Technology Based on the Learning Function and Optimum Multiple Objective Processes

    Science.gov (United States)

    Ueda, Haruka; Dazai, Ryota; Kaseda, Chosei; Ikaga, Toshiharu; Kato, Akihiro

    Demand among large office buildings for the energy-saving benefits of the HVAC (Heating, Ventilating and Air-Conditioning) System are increasing as more and more people become concerned with global environmental issues. However, immoderate measures taken in the interest of energy conservation may encroach on the thermal comfort and productivity level of office workers. Building management should satisfy both indoor thermal comfort and energy conservation while adapting to the many regulatory, social, climate, and other changes that occur during the lifespan of the building. This paper demonstrates how optimal control of the HVAC system, based on data modeling and the multi-objective optimal method, achieves an efficient equilibrium between thermal comfort and energy conservation.

  3. DEVELOPMENT OF THE OPTIMAL CONTROL MODEL FOR HVAC SYSTEM AND ITS APPLICATION%通风空调系统最优控制模型的开发及应用

    Institute of Scientific and Technical Information of China (English)

    刘贤坤; 董超俊

    2002-01-01

    对某一通风空调(HVAC)系统进行了实验,利用实验结果采用多变量自回归的方法开发了适用于HVAC系统控制的数学模型,该数字模型用于带有前馈补偿的线性二次高斯控制(LQG),控制房间的温度和湿度,大大改善了控制性能,提高了HVAC系统的稳定性.

  4. Efficient HVAC. New products; Climatización eficiente. Nuevos productos

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2016-07-01

    Jung is responding to the challenge of energy efficiency, ease of operation and economic profitability in all of its solutions for the tertiary sector, whether for newly constructed buildings or refurbishments, for full management of the electrical system or the partial control of lighting, HVAC, mood settings, access control, etc., for the bedrooms or specific areas of the building. In the specific case of hotels, Jung offers each a custom-made solution in line with its possibilities and objectives. (Author)

  5. Designing Forced-Air HVAC Systems

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-08-31

    This guide explains proper calculation of heating and cooling design loads for homes.used to calculated for the home using the protocols set forth in the latest edition of the Air Conditioning Contractors of America’s (ACCA) Manual J (currently the 8th edition), ASHRAE 2009 Handbook of Fundamentals, or an equivalent computation procedure.

  6. Choosing a Geothermal as an HVAC System.

    Science.gov (United States)

    Lensenbigler, John D.

    2002-01-01

    Describes the process of selecting and installing geothermal water source heat pumps for new residence halls at Johnson Bible College in Knoxville, Tennessee, including choosing the type of geothermal design, contractors, and interior equipment, and cost and payback. (EV)

  7. Choosing a Geothermal as an HVAC System.

    Science.gov (United States)

    Lensenbigler, John D.

    2002-01-01

    Describes the process of selecting and installing geothermal water source heat pumps for new residence halls at Johnson Bible College in Knoxville, Tennessee, including choosing the type of geothermal design, contractors, and interior equipment, and cost and payback. (EV)

  8. Strategy Guideline: Transitioning HVAC Companies to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2012-05-01

    This report describes the findings from research IBACOS conducted related to heating, ventilation, and air conditioning (HVAC) companies who have made the decision to transition to whole house performance contracting (WHPC).

  9. Strategy Guideline. Transitioning HVAC Companies to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS, Inc., Pittsburgh, PA (United States)

    2012-05-01

    This report describes the findings from research IBACOS conducted related to heating, ventilation, and air conditioning (HVAC) companies who have made the decision to transition to whole house performance contracting (WHPC).

  10. The HVAC Control Technology Making Energy Saving Compatible with Comfort

    National Research Council Canada - National Science Library

    高木, 康夫; 米沢, 憲造; 村山, 大; 西村, 信孝; 花田, 雄一; 山崎, 謙一

    2010-01-01

    .... The method is mainly focused on the compatibility of energy savings and comfort. The energy saving is achieved through the next generation air handling unit that controls room humidity without energy loss and the optimal operation of HVAC...

  11. Designing the controllability of a HVAC-plant by dynamic simulation

    Energy Technology Data Exchange (ETDEWEB)

    Novakovic, V.; Grindal, A.

    1994-05-01

    This paper was presented at CLIMA 2000 - The international conference on energy and environmental matters in built environment, London, 1.-3. November 1993. Nowadays, HVAC engineers can use dynamic simulation programs in their everyday work. Such tools provide the ability to analyze different system configurations and to check the obtained states even before the building and plant are constructed. To encourage its wider use, the authors present in this paper the experiences obtained with the simulation program HVAC-DYNAMICS. The program was used to simulate the retrofitting of a heat recovery wheel to a conventional ventilation plant with a hot water heating coil. The effects of different design parameters on the controllability of the plant were investigated. Interestingly, some commonly recommended ``clever`` configurations can lead to unexpected control scenarios. 4 refs., 3 figs., 2 tabs.

  12. Safety systems and access control in the National Ignition Facility.

    Science.gov (United States)

    Reed, Robert K; Bell, Jayce C

    2013-06-01

    The National Ignition Facility (NIF) is the world's largest and most energetic laser system. The facility has the potential to generate ionizing radiation due to the interaction between the laser beams and target material, with neutrons and gamma rays being produced during deuterium-tritium fusion reactions. To perform these experiments, several types of hazards must be mitigated and controlled to ensure personnel safety. NIF uses a real-time safety system to monitor and mitigate the hazards presented by the facility. The NIF facility Safety Interlock System (SIS) monitors for oxygen deficiency and controls access to the facility preventing exposure to laser light and radiation from the Radiation Generating Devices. It also interfaces to radiation monitoring and other radiological monitoring and alarm systems. The SIS controls permissives to the hazard-generating equipment and annunciates hazard levels in the facility. To do this reliably and safely, the SIS has been designed as a fail-safe system with a proven performance record now spanning over 10 y. This paper discusses the SIS, its design, implementation, operator interfaces, validation/verification, and the hazard mitigation approaches employed in the NIF. A brief discussion of the Failure Modes and Effect Analysis supporting the SIS will also be presented. The paper ends with a general discussion of SIS do's and don'ts and common design flaws that should be avoided in SIS design.

  13. Comparison of methods to evaluate the fungal biomass in heating, ventilation, and air-conditioning (HVAC) dust.

    Science.gov (United States)

    Biyeyeme Bi Mve, Marie-Jeanne; Cloutier, Yves; Lacombe, Nancy; Lavoie, Jacques; Debia, Maximilien; Marchand, Geneviève

    2016-12-01

    Heating, ventilation, and air-conditioning (HVAC) systems contain dust that can be contaminated with fungal spores (molds), which may have harmful effects on the respiratory health of the occupants of a building. HVAC cleaning is often based on visual inspection of the quantity of dust, without taking the mold content into account. The purpose of this study is to propose a method to estimate fungal contamination of dust in HVAC systems. Comparisons of different analytical methods were carried out on dust deposited in a controlled-atmosphere exposure chamber. Sixty samples were analyzed using four methods: culture, direct microscopic spore count (DMSC), β-N-acetylhexosaminidase (NAHA) dosing and qPCR. For each method, the limit of detection, replicability, and repeatability were assessed. The Pearson correlation coefficients between the methods were also evaluated. Depending on the analytical method, mean spore concentrations per 100 cm(2) of dust ranged from 10,000 to 682,000. Limits of detection varied from 120 to 217,000 spores/100 cm(2). Replicability and repeatability were between 1 and 15%. Pearson correlation coefficients varied from -0.217 to 0.83. The 18S qPCR showed the best sensitivity and precision, as well as the best correlation with the culture method. PCR targets only molds, and a total count of fungal DNA is obtained. Among the methods, mold DNA amplification by qPCR is the method suggested for estimating the fungal content found in dust of HVAC systems.

  14. Integrated Control of air distribution system noise-- A nuclear power plant control room HVAC system%空气输配系统噪声综合控制研究--某核电厂主控室暖通空调系统

    Institute of Scientific and Technical Information of China (English)

    刘海成

    2016-01-01

    China has built nuclear power plant main control room noise value agreed to 56dB (A) or so, after the noise control noise is 53dB (A) or so. However, according to relevant national standards, environmental noise limits for new projects main control room to achieve 45dB (A). Accordingly, the monitoring of operating nuclear power plants in the main control room noise, room sound field simulation and identify sound sources, found that: air HVAC system noise of the air distribution system to produce secondary duct itself radiated noise excitation is sound and solid the main source of indoor master acoustic environment. Studies have shown that: the main factors vent excessive noise muffler system design is unreasonable, the system calculation inaccurate flow noise, noise reduction equipment and system performance is not reasonable match and the lack of relevant engineering experience. In this paper, the problems identified, the system describes the different mechanisms produce noise with different noise reduction measures should be analyzed wind pipe itself radiated noise excitation and solid sound excessivecountermeasures, and from the HVAC system controls air distribution system starting noise, it made a similar noise reduction reference integrated HVAC systems solutions.%我国已建成的核电厂主控室内噪声值约定为56dB(A)左右,经噪声控制后噪声值为53dB(A)左右。但是根据有关国家标准的要求,新建项目主控室的环境噪声限值要达到45dB (A)。据此,监测在运行核电厂主控室内噪声,识别室内声场模拟及声源,发现:暖通空调系统之空气输配系统产生的风口噪声、风管本身辐射的二次激发噪声及固体声是主控室内声环境的最主要声源。研究表明:风口噪声超标主要因素有系统消声设计不合理,系统气流再生噪声计算不精确,消声设备性能与系统未合理匹配及缺乏相关工程经验等。本文针对问题

  15. Facilities and the Air Force Systems Acquisition Process.

    Science.gov (United States)

    1985-05-01

    to provide es- senti-l fLcilitio-s by, system Initial Cperatlcnal Capability (’-0C) . And secondly, vince the systems ;acjui. tior proceso is event...funds exclusively for systems acquisition. This change will remove the current military construction calendar constraint and allow facilities to be

  16. The Orbital Maneuvering Vehicle Training Facility visual system concept

    Science.gov (United States)

    Williams, Keith

    1989-01-01

    The purpose of the Orbital Maneuvering Vehicle (OMV) Training Facility (OTF) is to provide effective training for OMV pilots. A critical part of the training environment is the Visual System, which will simulate the video scenes produced by the OMV Closed-Circuit Television (CCTV) system. The simulation will include camera models, dynamic target models, moving appendages, and scene degradation due to the compression/decompression of video signal. Video system malfunctions will also be provided to ensure that the pilot is ready to meet all challenges the real-world might provide. One possible visual system configuration for the training facility that will meet existing requirements is described.

  17. Man-Vehicle Systems Research Facility - Design and operating characteristics

    Science.gov (United States)

    Shiner, Robert J.; Sullivan, Barry T.

    1992-01-01

    This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

  18. Guidelines for Management Information Systems in Canadian Health Care Facilities

    OpenAIRE

    Thompson, Larry E.

    1987-01-01

    The MIS Guidelines are a comprehensive set of standards for health care facilities for the recording of staffing, financial, workload, patient care and other management information. The Guidelines enable health care facilities to develop management information systems which identify resources, costs and products to more effectively forecast and control costs and utilize resources to their maximum potential as well as provide improved comparability of operations.

  19. Analysis of safeguards information treatment system at the facility level

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Doo; Song, Dae Yong; Kwack, Eun Ho

    2000-12-01

    Safeguards Information Treatment System(SITS) at the facility level is required to implement efficiently the obligations under the Korea-IAEA Safeguards Agreement, bilateral agreements with other countries and domestic law. In this report, the analysis of information, which the SITS treats, and operation environment of SITS including the review of the relationship between safeguards information are described. SITS will be developed to cover the different accounting procedures and methods applied at the various facilities under IAEA safeguards.

  20. Fermilab accelerator control system: Analog monitoring facilities

    Energy Technology Data Exchange (ETDEWEB)

    Seino, K.; Anderson, L.; Smedinghoff, J.

    1987-10-01

    Thousands of analog signals are monitored in different areas of the Fermilab accelerator complex. For general purposes, analog signals are sent over coaxial or twinaxial cables with varying lengths, collected at fan-in boxes and digitized with 12 bit multiplexed ADCs. For higher resolution requirements, analog signals are digitized at sources and are serially sent to the control system. This paper surveys ADC subsystems that are used with the accelerator control systems and discusses practical problems and solutions, and it describes how analog data are presented on the console system.

  1. WIND TURBINE DRIVETRAIN TEST FACILITY DATA ACQUISITION SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Mcintosh, J.

    2012-01-03

    The Wind Turbine Drivetrain Test Facility (WTDTF) is a state-of-the-art industrial facility used for testing wind turbine drivetrains and generators. Large power output wind turbines are primarily installed for off-shore wind power generation. The facility includes two test bays: one to accommodate turbine nacelles up to 7.5 MW and one for nacelles up to 15 MW. For each test bay, an independent data acquisition system (DAS) records signals from various sensors required for turbine testing. These signals include resistance temperature devices, current and voltage sensors, bridge/strain gauge transducers, charge amplifiers, and accelerometers. Each WTDTF DAS also interfaces with the drivetrain load applicator control system, electrical grid monitoring system and vibration analysis system.

  2. Research of Road Traffic Facilities System Based on GIS

    Directory of Open Access Journals (Sweden)

    Liu-Jian

    2013-06-01

    Full Text Available In order to improve the labor efficiency and economic benefit of road traffic facilities system and reduce resource waste, a scheme of road traffic facilities system based on GIS is provided in this paper. In the new scheme, firstly, we proposed Visual C++ embedding MapX component to program for the visualization of data and function analysis of space, and constructed core table in database and established property database and space database to improve efficiency; then we put forward the system function of traditional traffic facilities such as data collection, construction and management of engineering and so on. The results show that the system can ensure the safety and smooth of traffic than ever.

  3. Power Systems Development Facility. First quarterly report, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The objective of this project, herein referred to as the Power Systems Development Facility (PSDF), is to evaluate hot gas particle control technologies using coal derived gas streams. This project entails the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device (PCD) issues to be addressed include the integration of the PCDs into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

  4. Design of safeguards information treatment system at the facility level

    Energy Technology Data Exchange (ETDEWEB)

    Song, Dae Yong; Lee, Byung Doo; Kwack, Eun Ho; Choi, Young Myong

    2001-05-01

    We are developing Safeguards Information Treatment System at the facility level(SITS) to manage synthetically safeguards information and to implement efficiently the obligations under the Korea-IAEA Safeguards Agreement, bilateral agreements with other countries and domestic law. In this report, we described the contents of the detailed design of SITS such as database, I/O layout and program. In the present, we are implementing the SITS based on the contents of the design of SITS, and then we plan to provide the system for the facilities after we finish implementing and testing the system.

  5. A Dynamical Simulation Facility for Hybrid Systems

    CERN Document Server

    Back, A; Myers, M; Back, Allen; Guckenheimer, John; Myers, Mark

    1993-01-01

    Abstract: This paper establishes a general framework for describing hybrid dynamical systems which is particularly suitable for numerical simulation. In this context, the data structures used to describe the sets and functions which comprise the dynamical system are crucial since they provide the link between a natural mathematical formulation of a problem and the correct application of standard numerical algorithms. We describe a partial implementation of the design methodology and use this simulation tool for a specific control problem in robotics as an illustration of the utility of the approach for practical applications.

  6. Smart Parking System with Image Processing Facility

    Directory of Open Access Journals (Sweden)

    M.O. Reza

    2012-04-01

    Full Text Available Smart Parking Systems obtain information about available parking spaces, process it and then place the car at a certain position. A prototype of the parking assistance system based on the proposed architecture was constructed here. The adopted hardware, software, and implementation solutions in this prototype construction are described in this paper. The effective circular design is introduced here having rack-pinion special mechanism which is used to lift and place the car in the certain position. The design of rack pinion mechanism is also simulated using AUTODESK INVENTOR and COMSOL software.

  7. Facility Requirements for Integrated Learning Systems.

    Science.gov (United States)

    Knirk, Frederick G.

    1992-01-01

    Discusses features in the physical environment that need to be considered for integrated learning systems (ILSs). Highlights include ergonomics; lighting, including contrast and colors; space, furniture, and equipment, including keyboard, monitor, software, and printer; ambient noise and acoustics; temperature, humidity, and air quality control;…

  8. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  9. Control and Data Acquisition System of the ATLAS Facility

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Ki-Yong; Kwon, Tae-Soon; Cho, Seok; Park, Hyun-Sik; Baek, Won-Pil; Kim, Jung-Taek

    2007-02-15

    This report describes the control and data acquisition system of an integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation) facility, which recently has been constructed at KAERI (Korea Atomic Energy Research Institute). The control and data acquisition system of the ATLAS is established with the hybrid distributed control system (DCS) by RTP corp. The ARIDES system on a LINUX platform which is provided by BNF Technology Inc. is used for a control software. The IO signals consists of 1995 channels and they are processed at 10Hz. The Human-Machine-Interface (HMI) consists of 43 processing windows and they are classified according to fluid system. All control devices can be controlled by manual, auto, sequence, group, and table control methods. The monitoring system can display the real time trend or historical data of the selected IO signals on LCD monitors in a graphical form. The data logging system can be started or stopped by operator and the logging frequency can be selected among 0.5, 1, 2, 10Hz. The fluid system of the ATLAS facility consists of several systems including a primary system to auxiliary system. Each fluid system has a control similarity to the prototype plant, APR1400/OPR1000.

  10. Operation technology of air treatment system in nuclear facilities

    CERN Document Server

    Chun, Y B; Hwong, Y H; Lee, H K; Min, D K; Park, K J; Uom, S H; Yang, S Y

    2001-01-01

    Effective operation techniques were reviewed on the air treatment system to protect the personnel in nuclear facilities from the contamination of radio-active particles and to keep the environment clear. Nuclear air treatment system consisted of the ventilation and filtering system was characterized by some test. Measurement of air velocity of blowing/exhaust fan in the ventilation system, leak tests of HEPA filters in the filtering, and measurement of pressure difference between the areas defined by radiation level were conducted. The results acquired form the measurements were reflected directly for the operation of air treatment. In the abnormal state of virus parts of devices composted of the system, the repairing method, maintenance and performance test were also employed in operating effectively the air treatment system. These measuring results and techniques can be available to the operation of air treatment system of PIEF as well as the other nuclear facilities in KAERI.

  11. Facilities and regionalization--emergency medical services systems.

    Science.gov (United States)

    Stewart, R D

    1990-02-01

    Advanced life support and the modern EMS system were born out of the hope that by extending hospital emergency facilities outside the bounds of the hospital, earlier and more intensive care could be provided to those patients requiring it. EMS systems have since left the nest and only recently, following a turbulent adolescence, is prehospital care returning as a partner with the medical facilities and physicians that presided over their modern origins. The next decade will see the continuing trend toward hospitals and practitioners regaining some influence in the design and direction of prehospital care.

  12. Physics Detector Simulation Facility Phase II system software description

    Energy Technology Data Exchange (ETDEWEB)

    Scipioni, B.; Allen, J.; Chang, C.; Huang, J.; Liu, J.; Mestad, S.; Pan, J.; Marquez, M.; Estep, P.

    1993-05-01

    This paper presents the Physics Detector Simulation Facility (PDSF) Phase II system software. A key element in the design of a distributed computing environment for the PDSF has been the separation and distribution of the major functions. The facility has been designed to support batch and interactive processing, and to incorporate the file and tape storage systems. By distributing these functions, it is often possible to provide higher throughput and resource availability. Similarly, the design is intended to exploit event-level parallelism in an open distributed environment.

  13. Energization of Long HVAC Cables in Parallel - Analysis and Estimation Formulas

    DEFF Research Database (Denmark)

    Silva, Filipe Faria Da; Bak, Claus Leth

    2012-01-01

    The installation of long HVAC cables has recently become more common and it tends to increase during the next years. Consequently, the energization of long HVAC cables in parallel is also a more common condition. The energization of HVAC cables in parallel resembles the en-ergization of capacitor...

  14. 10 CFR 431.402 - Preemption of State regulations for commercial HVAC & WH products.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Preemption of State regulations for commercial HVAC & WH... regulations for commercial HVAC & WH products. Beginning on the effective date of such standard, an energy conservation standard set forth in this Part for a commercial HVAC & WH product supersedes any State or...

  15. Introduction to Heating, Ventilation and Air Conditioning (HVAC). Instructor Edition. Introduction to Construction Series.

    Science.gov (United States)

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This instructor's guide contains the materials required to teach a competency-based introductory course in heating, ventilating, and air conditioning (HVAC) to students who have chosen to explore careers in construction. It contains three units: HVAC materials, HVAC tools, and applied skills. Each instructional unit includes some or all of the…

  16. Introduction to Heating, Ventilation and Air Conditioning (HVAC). Instructor Edition. Introduction to Construction Series.

    Science.gov (United States)

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This instructor's guide contains the materials required to teach a competency-based introductory course in heating, ventilating, and air conditioning (HVAC) to students who have chosen to explore careers in construction. It contains three units: HVAC materials, HVAC tools, and applied skills. Each instructional unit includes some or all of the…

  17. Deposition of biological aerosols on HVAC heat exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Siegel, Jeffrey; Walker, Ian

    2001-09-01

    Many biologically active materials are transported as bioaerosols 1-10 {micro}m in diameter. These particles can deposit on cooling and heating coils and lead to serious indoor air quality problems. This paper investigates several of the mechanisms that lead to aerosol deposition on fin and tube heat exchangers. A model has been developed that incorporates the effects of several deposition mechanisms, including impaction, Brownian and turbulent diffusion, turbophoresis, thermophoresis, diffusiophoresis, and gravitational settling. The model is applied to a typical range of air velocities that are found in commercial and residential HVAC systems 1 - 6 m/s (200 - 1200 ft/min), particle diameters from 1 - 8 {micro}m, and fin spacings from 3.2 - 7.9 fins/cm (8 - 16 fins/inch or FPI). The results from the model are compared to results from an experimental apparatus that directly measures deposition on a 4.7 fins/cm (12 FPI) coil. The model agrees reasonably well with this measured data and suggests that cooling coils are an important sink for biological aerosols and consequently a potential source of indoor air quality problems.

  18. Thermal Vacuum Control Systems Options for Test Facilities

    Science.gov (United States)

    Marchetti, John

    2008-01-01

    This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.

  19. Facility level thermal systems for the Advanced Technology Solar Telescope

    Science.gov (United States)

    Phelps, LeEllen; Murga, Gaizka; Fraser, Mark; Climent, Tània

    2012-09-01

    The management and control of the local aero-thermal environment is critical for success of the Advanced Technology Solar Telescope (ATST). In addition to minimizing disturbances to local seeing, the facility thermal systems must meet stringent energy efficiency requirements to minimize impact on the surrounding environment and meet federal requirements along with operational budgetary constraints. This paper describes the major facility thermal equipment and systems to be implemented along with associated energy management features. The systems presented include the central plant, the climate control systems for the computer room and coudé laboratory, the carousel cooling system which actively controls the surface temperature of the rotating telescope enclosure, and the systems used for active and passive ventilation of the telescope chamber.

  20. An Electronic Pressure Profile Display system for aeronautic test facilities

    Science.gov (United States)

    Woike, Mark R.

    1990-01-01

    The NASA Lewis Research Center has installed an Electronic Pressure Profile Display system. This system provides for the real-time display of pressure readings on high resolution graphics monitors. The Electronic Pressure Profile Display system will replace manometer banks currently used in aeronautic test facilities. The Electronic Pressure Profile Display system consists of an industrial type Digital Pressure Transmitter (DPI) unit which interfaces with a host computer. The host computer collects the pressure data from the DPI unit, converts it into engineering units, and displays the readings on a high resolution graphics monitor in bar graph format. Software was developed to accomplish the above tasks and also draw facility diagrams as background information on the displays. Data transfer between host computer and DPT unit is done with serial communications. Up to 64 channels are displayed with one second update time. This paper describes the system configuration, its features, and its advantages over existing systems.

  1. HYDROGEN IGNITION MECHANISM FOR EXPLOSIONS IN NUCLEAR FACILITY PIPE SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Leishear, R

    2010-05-02

    Hydrogen and oxygen generation due to the radiolysis of water is a recognized hazard in pipe systems used in the nuclear industry, where the accumulation of hydrogen and oxygen at high points in the pipe system is expected, and explosive conditions exist. Pipe ruptures at nuclear facilities were attributed to hydrogen explosions inside pipelines, in nuclear facilities, i.e., Hamaoka, Nuclear Power Station in Japan, and Brunsbuettel in Germany. Prior to these accidents an ignition source for hydrogen was questionable, but these accidents, demonstrated that a mechanism was, in fact, available to initiate combustion and explosion. Hydrogen explosions may occur simultaneously with water hammer accidents in nuclear facilities, and a theoretical mechanism to relate water hammer to hydrogen deflagrations and explosions is presented herein.

  2. Surveillance system for DUPIC fuel development facility (I)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, D. Y.; Kim, H. D.; Park, C. S.; Cha, H. R.; Hong, J. S.; Yang, M. S. [KAERI, Taejon (Korea, Republic of)

    2000-05-01

    DUPIC Surveillance System is developed to process image data and radiation data together to diagnose intelligently the transportation status of the nuclear material, which makes it possible that usual DUPIC process be carried out without interruption under the surveillance. We developed the neutron monitor for surveillance and the system which takes and processes radiation data and image data, where the system is under the test operation after installed at DFDF (Dupic Fuel Development Facility)

  3. Cold Vacuum Drying Facility Stack Air Sampling System Qualification Tests

    Energy Technology Data Exchange (ETDEWEB)

    Glissmeyer, John A.

    2001-01-24

    This report documents tests that were conducted to verify that the air monitoring system for the Cold Vacuum Drying Facility ventilation exhaust stack meets the applicable regulatory criteria regarding the placement of the air sampling probe, sample transport, and stack flow measurement accuracy.

  4. Superconducting magnet system for an experimental disk MHD facility

    NARCIS (Netherlands)

    Knoopers, H.G.; Kate, ten H.H.J.; Klundert, van de L.J.M.

    1991-01-01

    A predesign of a split-pair magnet for a magnetohydrodynamic (MHD) facility for testing a 10-MW open-cycle disk or a 5-MW closed-cycle disk generator is presented. The magnet system consists of a NbTi and a Nb 3Sn section, which provide a magnetic field of 9 T in the active area of the MHD channel.

  5. Data Acquisition System of FlashADC on GTAF Facility

    Institute of Scientific and Technical Information of China (English)

    ZHANG; Qi-wei; HE; Guo-zhu; HUANG; Xing; RUAN; Xi-chao; ZHOU; Zu-ying; ZHU; Xing-hua

    2013-01-01

    The data acquisition system of GTAF facility bases on the digitizer of FlashADC(DC271A,made by Acqiris Technologies Inc.),which can achieve the acquisition of experimental data and real-time monitoring of on-line measure by the capture of digital full pulse waveform from 40 BaF2 detectors.Fig.1

  6. Mirror Fusion Test Facility: Superconducting magnet system cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    1977-07-01

    At the request of Victor Karpenko, Project manager for LLL`s Mirror Fusion Test Facility, EG&G has prepared this independent cost analysis for the proposed MFTF Superconducting Magnet System. The analysis has attempted to show sufficient detail to provide adequate definition for a basis of estimating costs.

  7. Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas

    2009-12-31

    This report documents the self-correction algorithms developed in the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls project funded jointly by the Bonneville Power Administration and the Building Technologies Program of the U.S. Department of Energy. The algorithms address faults for temperature sensors, humidity sensors, and dampers in air-handling units and correction of persistent manual overrides of automated control systems. All faults considered create energy waste when left uncorrected as is frequently the case in actual systems.

  8. Phase II Audit Report - Energy & Water Audits of LLNL Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Horst, B I; Jacobs, P C; Pierce, S M

    2005-08-03

    This report describes Phase II of a project conducted for the Mechanical Utilities Division (UTel), Energy Management Program at Lawrence Livermore National Laboratory (LLNL) by Architectural Energy Corporation (AEC). The overall project covers energy efficiency and water conservation auditing services for 215 modular and prefabricated buildings at LLNL. The primary goal of this project is to demonstrate compliance with DOE Order 430.2A, Contractor Requirements Document section 2.d (2) Document, to demonstrate annual progress of at least 10 percent toward completing energy and water audits of all facilities. Although this project covers numerous buildings, they are all similar in design and use. The approach employed for completing audits for these facilities involves a ''model-similar building'' approach. In the model-similar building approach, similarities between groups of buildings are established and quantified. A model (or test case) building is selected and analyzed for each model-similar group using a detailed DOE-2 simulation. The results are extended to the group of similar buildings based on careful application of quantified similarities, or ''extension measures''. This approach leverages the relatively minor effort required to evaluate one building in some detail to a much larger population of similar buildings. The facility wide energy savings potential was calculated for a select set of measures that have reasonable payback based on the detailed building analysis and are otherwise desirable to the LLNL facilities staff. The selected measures are: (1) HVAC Tune-up. This is considered to be a ''core measure'', based on the energy savings opportunity and the impact on thermal comfort. All HVAC units in the study are assumed to be tuned up under this measure. See the Appendix for a detailed calculation by building and HVAC unit. (2) HVAC system scheduling. This is also considered to be a &apos

  9. Sectoral innovation system foresight in practice: Nordic facilities management foresight

    DEFF Research Database (Denmark)

    Andersen, Per Dannemand; Dahl Andersen, Allan; Jensen, Per Anker

    2014-01-01

    A number of studies have explored the interconnection between the foresight literature and the innovation system literature. This paper adds to these studies by investigating how theoretical elements of the innovation system approach can contribute to the design and practice of foresight processes...... a proposal for a common Nordic facilities management research agenda. The paper finds that three elements of the innovation system literature are of particular interest for the practice of foresight: innovation systems and context dependency, learning and user-producer interactions, and the role of knowledge...... and knowledge production. These elements are embedded into a simple sectoral innovation system model (including actors, knowledge flows, and the strategic environment)....

  10. Airflow Measurement of the Car HVAC Unit Using Hot-wire Anemometry

    Directory of Open Access Journals (Sweden)

    Fojtlín Miloš

    2016-01-01

    Full Text Available Thermal environment in a vehicular cabin significantly influence drivers’ fatigue and passengers’ thermal comfort. This environment is traditionally managed by HVAC cabin system that distributes air and modifies its properties. In order to simulate cabin thermal behaviour, amount of the air led through car vents must be determined. The aim of this study was to develop methodology to measure airflow from the vents, and consequently calculate corresponding air distribution coefficients. Three climatic cases were selected to match European winter, summer, and spring / fall conditions. Experiments were conducted on a test vehicle in a climatic chamber. The car HVAC system was set to automatic control mode, and the measurements were executed after the system stabilisation—each case was independently measured three times. To be able to evaluate precision of the method, the airflow was determined at the system inlet (HVAC suction and outlet (each vent, and the total airflow values were compared. The airflow was calculated by determining a mean value of the air velocity multiplied by an area of inlet / outlet cross-section. Hot-wire anemometry was involved to measure the air velocity. Regarding the summer case, total airflow entering the cabin was around 57 l s-1 with 60 % of the air entering the cabin through dashboard vents; no air was supplied to the feet compartment. The remaining cases had the same total airflow of around 42 l s-1, and the air distribution was focused mainly on feet and windows. The inlet and outlet airflow values show a good match with a maximum mass differential of 8.3 %.

  11. Airflow Measurement of the Car HVAC Unit Using Hot-wire Anemometry

    Science.gov (United States)

    Fojtlín, Miloš; Planka, Michal; Fišer, Jan; Pokorný, Jan; Jícha, Miroslav

    2016-03-01

    Thermal environment in a vehicular cabin significantly influence drivers' fatigue and passengers' thermal comfort. This environment is traditionally managed by HVAC cabin system that distributes air and modifies its properties. In order to simulate cabin thermal behaviour, amount of the air led through car vents must be determined. The aim of this study was to develop methodology to measure airflow from the vents, and consequently calculate corresponding air distribution coefficients. Three climatic cases were selected to match European winter, summer, and spring / fall conditions. Experiments were conducted on a test vehicle in a climatic chamber. The car HVAC system was set to automatic control mode, and the measurements were executed after the system stabilisation—each case was independently measured three times. To be able to evaluate precision of the method, the airflow was determined at the system inlet (HVAC suction) and outlet (each vent), and the total airflow values were compared. The airflow was calculated by determining a mean value of the air velocity multiplied by an area of inlet / outlet cross-section. Hot-wire anemometry was involved to measure the air velocity. Regarding the summer case, total airflow entering the cabin was around 57 l s-1 with 60 % of the air entering the cabin through dashboard vents; no air was supplied to the feet compartment. The remaining cases had the same total airflow of around 42 l s-1, and the air distribution was focused mainly on feet and windows. The inlet and outlet airflow values show a good match with a maximum mass differential of 8.3 %.

  12. Personnel Access Control System Evaluation for National Ignition Facility Operations

    Energy Technology Data Exchange (ETDEWEB)

    Altenbach, T; Brereton, S.; Hermes, G.; Singh, M.

    2001-06-01

    The purpose of this document is to analyze the baseline Access Control System for the National Ignition Facility (NIF), and to assess its effectiveness at controlling access to hazardous locations during full NIF operations. It reviews the various hazards present during a NIF shot sequence, and evaluates the effectiveness of the applicable set of controls at preventing access while the hazards are present. It considers only those hazards that could potentially be lethal. In addition, various types of technologies that might be applicable at NIF are reviewed, as are systems currently in use at other facilities requiring access control for safety reasons. Recommendations on how this system might be modified to reduce risk are made.

  13. Feasibility study for a transportation operations system cask maintenance facility

    Energy Technology Data Exchange (ETDEWEB)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  14. System specification for Fort Hood Solar Cogeneration Facility

    Energy Technology Data Exchange (ETDEWEB)

    1981-05-01

    The characteristics and design and environmental requirements are specified for a solar cogeneration facility at the Fort Hood Army Base in Killeen, Texas. Characteristics of the system and major elements are described, and applicable standards, codes, laws and regulations are listed. Performance requirements for the total system and for each individual subsystem are presented. Survival requirements are given for various environmental extremes, with consideration given to lightning protection and effects of direct or adjacent lightning strikes. Air quality control standards are briefly mentioned. The facility operates in two principal modes: energy collection and energy utilization. The plant is capable of operating in either mode independently or in both modes simultaneously. The system is also operational in transitional and standby/inactive modes. (LEW)

  15. Nuclear material surveillance system for DUPIC fuel development facility

    Energy Technology Data Exchange (ETDEWEB)

    Song, D. Y.; Lee, S. Y.; Ha, J. H.; Go, W. I.; Kim, H. D. [KAERI, Taejon (Korea, Republic of)

    2004-07-01

    Unattended continuous surveillance systems for safeguards of nuclear facility result in large amounts of image and radiation data, which require much time and effort to inspect. Therefore, it is necessary to develop system that automatically pinpoints and diagnoses the anomalies from data. In this regards, this paper presents a novel concept of the continuous surveillance system that integrates visual image and radiation data by the use of neural networks based on self-organized feature mapping. This surveillance system is stably operating for safeguards of the DUPIC (DFDF) in KAERI.

  16. Reducing Building HVAC Costs with Site-Recovery Energy

    Science.gov (United States)

    Pargeter, Stephen J.

    2012-01-01

    Building owners are caught between two powerful forces--the need to lower energy costs and the need to meet or exceed outdoor air ventilation regulations for occupant health and comfort. Large amounts of energy are wasted each day from commercial, institutional, and government building sites as heating, ventilation, and air conditioning (HVAC)…

  17. Illinois Occupational Skill Standards: HVAC/R Technician Cluster.

    Science.gov (United States)

    Illinois Occupational Skill Standards and Credentialing Council, Carbondale.

    This document, which is intended to serve as a guide for work force preparation program providers, details the Illinois occupational skill standards for programs preparing students for employment in jobs in the heating, ventilation, air conditioning, and refrigeration (HVAC/R) industry. Agency partners involved in this project include: the…

  18. Maximize Benefits, Minimize Risk: Selecting the Right HVAC Firm.

    Science.gov (United States)

    Golden, James T.

    1993-01-01

    An informal survey of 20 major urban school districts found that 40% were currently operating in a "break down" maintenance mode. A majority, 57.9%, also indicated they saw considerable benefits in contracting for heating, ventilating, and air conditioning (HVAC) maintenance services with outside firms. Offers guidelines in selecting HVAC…

  19. Maximize Benefits, Minimize Risk: Selecting the Right HVAC Firm.

    Science.gov (United States)

    Golden, James T.

    1993-01-01

    An informal survey of 20 major urban school districts found that 40% were currently operating in a "break down" maintenance mode. A majority, 57.9%, also indicated they saw considerable benefits in contracting for heating, ventilating, and air conditioning (HVAC) maintenance services with outside firms. Offers guidelines in selecting…

  20. Loss evaluation of HVAC and HVDC transmission solutions for large offshore wind farms

    Energy Technology Data Exchange (ETDEWEB)

    Negra, N. Barberis [Politecnico of Turin, Department of Electrical Engineering (Italy); Todorovic, J. [ELEKTROPRENOS, Banja Luka (Bosnia and Herzegovina); Ackermann, T. [Royal Institute of Technology, Teknikringen 33, 10044 Stockholm (Sweden)

    2006-07-15

    This paper presents a comparison of transmission losses for different technical transmission solutions for large offshore wind farms. Three technical solutions are analyzed, i.e. HVAC, HVDC Line Commutated Converter (LCC) and HVDC Voltage Source Converter (VSC). The losses for each technology are calculated for wind farms with different ratings and various distances to shore. In addition, solutions with combinations of two and the three different transmission technologies are analyzed and compared. Based on this comparison, further analysis regarding the economical feasibility can be performed in order to determine the most economic solutions for the transmission system of an offshore wind farm. (author)

  1. Leak test of the charcoal filter in the nuclear facility

    Energy Technology Data Exchange (ETDEWEB)

    Baek, Sang Yeol; Lee, Key Soon; Hong, Kwon Pyo; Oh, Yon Woo; Park, Dae Kyu; Ahn, Sang Bok; Choo, Yong Sun; Kim, Sung Jung

    1998-06-01

    In the heating, ventilation and air conditioning(HVAC) system, pre-filter, HEPA(high efficiency particle air) filter and charcoal filter are instrumented in order to filter off the radioactive substance in the nuclear facility. Equipment of the charcoal filter off the radioactive substance in the nuclear facility. Equipment of the charcoal filter at the hot cell where manipulates the nuclear fuel irradiated in the nuclear reactor is essential for shutting off the leakage of the radioiodine which is produced from the cutting procedures of nuclear fuel. Also, the leak test of installed filter should be performed perfectly. In addition, charcoal filter is instrumented to filter the radioactive gas such as radioiodine which is produced in the nuclear facility. In this technical report, the theoretical discussion, the experimental procedures and the precautions of the leak test of charcoal filter are described. (author). 8 refs., 4 tabs., 8 figs.

  2. Use of video systems in securing nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Zakharko, Eleonora; Weizel, Udo [Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (GRS), Koeln (Germany); Rduch, Alexander

    2010-07-01

    Current paper considers application of video systems, so called Closed-Circuit Television (CCTV), in physical protection of nuclear facilities. CCTV is being used for general surveillance tasks, for alarm assessment, for detection purposes and is crucial for the efficient operation of physical protection system in whole. The main parts of general design layout are being analyzed: i.e. image obtaining, signal transmission, signal processing and signal visualization is being provided. It is underlined, that the general trend of high tech solutions in the field of physical protection is in particular based on innovations in the applications with video systems (orig.)

  3. Optical pulse generation system for the National Ignition Facility (NIF)

    Energy Technology Data Exchange (ETDEWEB)

    Penko, F; Braucht,; Browning, D; Crane, J K; Dane, B; Deadrick, F; Dreifuerst, G; Henesian, M; Jones, B A; Kot, L; Laumann, C; Martinez, M; Moran, B; Rothenberg, J E; Skulina, K; Wilcox, R B

    1998-06-18

    We describe the Optical Pulse Generation (OPG) system for the National Ignition Facility ( NIF ). The OPG system begins with the Master Oscillator Room ( MOR ) where the initial, seed pulse for the entire laser system is produced and properly formatted to enhance ignition in the target. The formatting consists of temporally shaping the pulse and adding additional bandwidth to increase the coupling of the laser generated x-rays to the high density target plasma. The pulse produced in the MOR fans out to 48 identical preamplifier modules where it is amplified by a factor of ten billion and spatially shaped for injection into the 192 main amplifier chai

  4. NASA Glenn Propulsion Systems Lab (PSL) Icing Facility Update

    Science.gov (United States)

    Thomas, Queito P.

    2015-01-01

    The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, PSL is capable of simulation of in-flight icing events in a ground test facility. The system was designed to operate at altitudes from 4,000 ft. to 40,000 ft. at Mach numbers up to 0.8M and inlet total temperatures from -60F to +15F.

  5. The VLT Adaptive Optics Facility Project: Telescope Systems

    Science.gov (United States)

    Arsenault, Robin; Hubin, Norbert; Stroebele, Stefan; Fedrigo, Enrico; Oberti, Sylvain; Kissler-Patig, Markus; Bacon, Roland; McDermid, Richard; Bonaccini-Calia, Domenico; Biasi, Roberto; Gallieni, Daniele; Riccardi, Armando; Donaldson, Rob; Lelouarn, Miska; Hackenberg, Wolfgang; Conzelman, Ralf; Delabre, Bernard; Stuik, Remko; Paufique, Jerome; Kasper, Markus; Vernet, Elise; Downing, Mark; Esposito, Simone; Duchateau, Michel; Franx, Marijn; Myers, Richard; Goodsell, Steven

    2006-03-01

    The Adaptive Optics Facility is a project to convert UT4 into a specialised Adaptive Telescope. The present secondary mirror (M2) will be replaced by a new M2-Unit hosting a 1170-actuator deformable mirror. The three focal stations will be equipped with instruments adapted to the new capability of this UT. Two instruments have been identified for the two Nasmyth foci: Hawk-I with its AO module GRAAL allowing a Ground Layer Adaptive Optics correction and MUSE with GALACSI for GLAO correction and Laser Tomography Adaptive Optics correction. A future instrument still needs to be defined for the Cassegrain focus. Several guide stars are required for the type of adaptive corrections needed and a Four Laser Guide Star Facility (4LGSF) is being developed in the scope of the AO Facility. Convex mirrors like the VLT M2 represent a major challenge for testing and a substantial effort is dedicated to this. ASSIST, is a test bench that will allow testing of the Deformable Secondary Mirror and both instruments with simulated turbulence. This article focusses on the telescope systems (Adaptive Secondary, Four Laser Guide Star Facility, RTC platform and ASSIST Test Bench). The following article describes the AO Modules GALACSI and GRAAL.

  6. Thermal Vacuum Facility for Testing Thermal Protection Systems

    Science.gov (United States)

    Daryabeigi, Kamran; Knutson, Jeffrey R.; Sikora, Joseph G.

    2002-01-01

    A thermal vacuum facility for testing launch vehicle thermal protection systems by subjecting them to transient thermal conditions simulating re-entry aerodynamic heating is described. Re-entry heating is simulated by controlling the test specimen surface temperature and the environmental pressure in the chamber. Design requirements for simulating re-entry conditions are briefly described. A description of the thermal vacuum facility, the quartz lamp array and the control system is provided. The facility was evaluated by subjecting an 18 by 36 in. Inconel honeycomb panel to a typical re-entry pressure and surface temperature profile. For most of the test duration, the average difference between the measured and desired pressures was 1.6% of reading with a standard deviation of +/- 7.4%, while the average difference between measured and desired temperatures was 7.6% of reading with a standard deviation of +/- 6.5%. The temperature non-uniformity across the panel was 12% during the initial heating phase (t less than 500 sec.), and less than 2% during the remainder of the test.

  7. The National Ignition Facility front-end laser system

    Energy Technology Data Exchange (ETDEWEB)

    Burkhart, S.C.; Beach, R.J.; Crane, J.H.; Davin, J.M.; Perry, M.D.; Wilcox, R.B.

    1995-07-07

    The proposed National Ignition Facility is a 192 beam Nd:glass laser system capable of driving targets to fusion ignition by the year 2005. A key factor in the flexibility and performance of the laser is a front-end system which provides a precisely formatted beam to each beamline. Each of the injected beams has individually controlled energy, temporal pulseshape, and spatial shape to accommodate beamline-to-beamline variations in gain and saturation. This flexibility also gives target designers the options for precisely controlling the drive to different areas of the target. The design of the Front-End laser is described, and initial results are discussed.

  8. Removal of viable bioaerosol particles with a low-efficiency HVAC filter enhanced by continuous emission of unipolar air ions.

    Science.gov (United States)

    Huang, R; Agranovski, I; Pyankov, O; Grinshpun, S

    2008-04-01

    Continuous emission of unipolar ions has been shown to improve the performance of respirators and stationary filters challenged with non-biological particles. In this study, we investigated the ion-induced enhancement effect while challenging a low-efficiency heating, ventilation and air-conditioning (HVAC) filter with viable bacterial cells, bacterial and fungal spores, and viruses. The aerosol concentration was measured in real time. Samples were also collected with a bioaerosol sampler for viable microbial analysis. The removal efficiency of the filter was determined, respectively, with and without an ion emitter. The ionization was found to significantly enhance the filter efficiency in removing viable biological particles from the airflow. For example, when challenged with viable bacteria, the filter efficiency increased as much as four- to fivefold. For viable fungal spores, the ion-induced enhancement improved the efficiency by a factor of approximately 2. When testing with virus-carrying liquid droplets, the original removal efficiency provided by the filter was rather low: 9.09 +/- 4.84%. While the ion emission increased collection about fourfold, the efficiency did not reach 75-100% observed with bacteria and fungi. These findings, together with our previously published results for non-biological particles, demonstrate the feasibility of a new approach for reducing aerosol particles in HVAC systems used for indoor air quality control. Recirculated air in HVAC systems used for indoor air quality control in buildings often contains considerable number of viable bioaerosol particles because of limited efficiency of the filters installed in these systems. In the present study, we investigated - using aerosolized bacterial cells, bacterial and fungal spores, and virus-carrying particles - a novel idea of enhancing the performance of a low-efficiency HVAC filter utilizing continuous emission of unipolar ions in the filter vicinity. The findings described in

  9. Sliding Mode Thermal Control System for Space Station Furnace Facility

    Science.gov (United States)

    Jackson Mark E.; Shtessel, Yuri B.

    1998-01-01

    The decoupled control of the nonlinear, multiinput-multioutput, and highly coupled space station furnace facility (SSFF) thermal control system is addressed. Sliding mode control theory, a subset of variable-structure control theory, is employed to increase the performance, robustness, and reliability of the SSFF's currently designed control system. This paper presents the nonlinear thermal control system description and develops the sliding mode controllers that cause the interconnected subsystems to operate in their local sliding modes, resulting in control system invariance to plant uncertainties and external and interaction disturbances. The desired decoupled flow-rate tracking is achieved by optimization of the local linear sliding mode equations. The controllers are implemented digitally and extensive simulation results are presented to show the flow-rate tracking robustness and invariance to plant uncertainties, nonlinearities, external disturbances, and variations of the system pressure supplied to the controlled subsystems.

  10. 75 FR 70013 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Science.gov (United States)

    2010-11-16

    ... HUMAN SERVICES Centers for Medicare & Medicaid Services RIN 0938-AP89 Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2011; Correction AGENCY: Centers for..., ``Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2011.''...

  11. Smart HVAC Control in IoT: Energy Consumption Minimization with User Comfort Constraints

    Science.gov (United States)

    Verikoukis, Christos

    2014-01-01

    Smart grid is one of the main applications of the Internet of Things (IoT) paradigm. Within this context, this paper addresses the efficient energy consumption management of heating, ventilation, and air conditioning (HVAC) systems in smart grids with variable energy price. To that end, first, we propose an energy scheduling method that minimizes the energy consumption cost for a particular time interval, taking into account the energy price and a set of comfort constraints, that is, a range of temperatures according to user's preferences for a given room. Then, we propose an energy scheduler where the user may select to relax the temperature constraints to save more energy. Moreover, thanks to the IoT paradigm, the user may interact remotely with the HVAC control system. In particular, the user may decide remotely the temperature of comfort, while the temperature and energy consumption information is sent through Internet and displayed at the end user's device. The proposed algorithms have been implemented in a real testbed, highlighting the potential gains that can be achieved in terms of both energy and cost. PMID:25054163

  12. Smart HVAC control in IoT: energy consumption minimization with user comfort constraints.

    Science.gov (United States)

    Serra, Jordi; Pubill, David; Antonopoulos, Angelos; Verikoukis, Christos

    2014-01-01

    Smart grid is one of the main applications of the Internet of Things (IoT) paradigm. Within this context, this paper addresses the efficient energy consumption management of heating, ventilation, and air conditioning (HVAC) systems in smart grids with variable energy price. To that end, first, we propose an energy scheduling method that minimizes the energy consumption cost for a particular time interval, taking into account the energy price and a set of comfort constraints, that is, a range of temperatures according to user's preferences for a given room. Then, we propose an energy scheduler where the user may select to relax the temperature constraints to save more energy. Moreover, thanks to the IoT paradigm, the user may interact remotely with the HVAC control system. In particular, the user may decide remotely the temperature of comfort, while the temperature and energy consumption information is sent through Internet and displayed at the end user's device. The proposed algorithms have been implemented in a real testbed, highlighting the potential gains that can be achieved in terms of both energy and cost.

  13. Development of a method for bacteria and virus recovery from heating, ventilation, and air conditioning (HVAC) filters.

    Science.gov (United States)

    Farnsworth, James E; Goyal, Sagar M; Kim, Seung Won; Kuehn, Thomas H; Raynor, Peter C; Ramakrishnan, M A; Anantharaman, Senthilvelan; Tang, Weihua

    2006-10-01

    The aim of the work presented here is to study the effectiveness of building air handling units (AHUs) in serving as high volume sampling devices for airborne bacteria and viruses. An HVAC test facility constructed according to ASHRAE Standard 52.2-1999 was used for the controlled loading of HVAC filter media with aerosolized bacteria and virus. Nonpathogenic Bacillus subtilis var. niger was chosen as a surrogate for Bacillus anthracis. Three animal viruses; transmissible gastroenteritis virus (TGEV), avian pneumovirus (APV), and fowlpox virus were chosen as surrogates for three human viruses; SARS coronavirus, respiratory syncytial virus, and smallpox virus; respectively. These bacteria and viruses were nebulized in separate tests and injected into the test duct of the test facility upstream of a MERV 14 filter. SKC Biosamplers upstream and downstream of the test filter served as reference samplers. The collection efficiency of the filter media was calculated to be 96.5 +/- 1.5% for B. subtilis, however no collection efficiency was measured for the viruses as no live virus was ever recovered from the downstream samplers. Filter samples were cut from the test filter and eluted by hand-shaking. An extraction efficiency of 105 +/- 19% was calculated for B. subtilis. The viruses were extracted at much lower efficiencies (0.7-20%). Our results indicate that the airborne concentration of spore-forming bacteria in building AHUs may be determined by analyzing the material collected on HVAC filter media, however culture-based analytical techniques are impractical for virus recovery. Molecular-based identification techniques such as PCR could be used.

  14. National Ignition Facility Project Completion and Control System Status

    Energy Technology Data Exchange (ETDEWEB)

    Van Arsdall, P J; Azevedo, S G; Beeler, R G; Bryant, R M; Carey, R W; Demaret, R D; Fisher, J M; Frazier, T M; Lagin, L J; Ludwigsen, A P; Marshall, C D; Mathisen, D G; Reed, R K

    2009-10-02

    The National Ignition Facility (NIF) is the world's largest and most energetic laser experimental system providing a scientific center to study inertial confinement fusion (ICF) and matter at extreme energy densities and pressures. Completed in 2009, NIF is a stadium-sized facility containing a 1.8-MJ, 500-TW 192-beam ultraviolet laser and target chamber. A cryogenic tritium target system and suite of optical, X-ray and nuclear diagnostics will support experiments in a strategy to achieve fusion ignition starting in 2010. Automatic control of NIF is performed by the large-scale Integrated Computer Control System (ICCS), which is implemented by 2 MSLOC of Java and Ada running on 1300 front-end processors and servers. The ICCS framework uses CORBA distribution for interoperation between heterogeneous languages and computers. Laser setup is guided by a physics model and shots are coordinated by data-driven distributed workflow engines. The NIF information system includes operational tools and a peta-scale repository for provisioning experimental results. This paper discusses results achieved and the effort now underway to conduct full-scale operations and prepare for ignition.

  15. Data System Upgrades within the National Deep Submergence Facility

    Science.gov (United States)

    McCue, S. J.

    2010-12-01

    The National Deep Submergence Facility (NDSF) is funded by the National Science Foundation to provide operational support for deep submergence research. Recent modifications to status of the facility's vehicles and to some subsystems of each of the vehicles have improved the data offerings from the facility. Sentry has replaced ABE as the operational NDSF autonomous underwater vehicle (AUV) and joins Human Occupied Vehicle (HOV) Alvin and Remotely Operated Vehicle (ROV) Jason. Sentry offers a more robust sensor and processing suite than did ABE. Each of the three vehicles now carry a well known 512 beam bathymetric sonar, which improves sampling resolution and post-processing flexibility. Each of the three vehicles have added a state-of-the-art ultra short baseline navigation system that offers performance similar to long baseline navigation, with simpler post-processing. HOV Alvin and ROV Jason are in the process of incorporating a high definition video pipeline, which offers improvement in both video and still image capture. We detail these changes and offer example results.

  16. Integration of criticality alarm system at a fuel manufacturing facility

    Energy Technology Data Exchange (ETDEWEB)

    Longinov, M.; Pant, A. [Zircatec Precision Industries, Port Hope, Ontario (Canada)

    2005-07-01

    In response to the Power Uprate program at Bruce Power, Zircatec has committed to introduce, by Spring 2006 a new manufacturing line for the production of 43 element CANFLEX bundles containing Slightly Enriched Uranium (SEU) with a centre pin of blended dysprosia/urania (BDU). This is a new fuel design and is the first change in fuel design since the introduction of the current 37 element fuel over 20 years ago. As the primary fuel supplier to the reactor site that has chosen to utilize this new fuel design, Zircatec has agreed to manufacture and supply this new fuel at their facility in Port Hope, Ontario. Under this agreement, Zircatec is challenged with converting a fuel manufacturing facility to include the processing of enriched uranium. The challenge is to introduce the new concept of criticality control to a facility that traditionally does not have to deal with such a concept. One of the elements of the implementation is the criticality detection and alarm system - CIDAS. Since a criticality could go undetected by human senses, one of the methods of ensuring safety from radiation exposure in the event of a criticality is the installation of a criticality incident detection and alarm system. This early warning device could be the difference between low dose exposure and lethal exposure. This paper describes the challenges that Zircatec has faced with the installation of a criticality incident detection and alarm system. These challenges include determining the needs and requirements, determining appropriate specifications, selecting the right equipment, installing the equipment and training personnel in the operation of the new equipment. (author)

  17. Superconducting magnet system for an experimental disk MHD facility

    OpenAIRE

    Knoopers, H.G.; Kate, ten, H.H.J.; Klundert, van de, L.J.M.

    1991-01-01

    A predesign of a split-pair magnet for a magnetohydrodynamic (MHD) facility for testing a 10-MW open-cycle disk or a 5-MW closed-cycle disk generator is presented. The magnet system consists of a NbTi and a Nb 3Sn section, which provide a magnetic field of 9 T in the active area of the MHD channel. The optimization process, which is based on minimum conductor costs is discussed, and the proposed conductor design is described. Basic solutions for the construction of the magnet, the cryostat an...

  18. Control and Information Systems for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Brunton, Gordon; Casey, Allan; Christensen, Marvin; Demaret, Robert; Fedorov, Mike; Flegel, Michael; Folta, Peg; Fraizer, Timothy; Hutton, Matthew; Kegelmeyer, Laura; Lagin, Lawrence; Ludwigsen, Pete; Reed, Robert; Speck, Douglas; Wilhelmsen, Karl

    2015-11-03

    Orchestration of every National Ignition Facility (NIF) shot cycle is managed by the Integrated Computer Control System (ICCS), which uses a scalable software architecture running code on more than 1950 front-end processors, embedded controllers, and supervisory servers. The ICCS operates laser and industrial control hardware containing 66 000 control and monitor points to ensure that all of NIF’s laser beams arrive at the target within 30 ps of each other and are aligned to a pointing accuracy of less than 50 μm root-mean-square, while ensuring that a host of diagnostic instruments record data in a few billionths of a second. NIF’s automated control subsystems are built from a common object-oriented software framework that distributes the software across the computer network and achieves interoperation between different software languages and target architectures. A large suite of business and scientific software tools supports experimental planning, experimental setup, facility configuration, and post-shot analysis. Standard business services using open-source software, commercial workflow tools, and database and messaging technologies have been developed. An information technology infrastructure consisting of servers, network devices, and storage provides the foundation for these systems. This paper is an overview of the control and information systems used to support a wide variety of experiments during the National Ignition Campaign.

  19. Demand response-enabled model predictive HVAC load control in buildings using real-time electricity pricing

    Science.gov (United States)

    Avci, Mesut

    A practical cost and energy efficient model predictive control (MPC) strategy is proposed for HVAC load control under dynamic real-time electricity pricing. The MPC strategy is built based on a proposed model that jointly minimizes the total energy consumption and hence, cost of electricity for the user, and the deviation of the inside temperature from the consumer's preference. An algorithm that assigns temperature set-points (reference temperatures) to price ranges based on the consumer's discomfort tolerance index is developed. A practical parameter prediction model is also designed for mapping between the HVAC load and the inside temperature. The prediction model and the produced temperature set-points are integrated as inputs into the MPC controller, which is then used to generate signal actions for the AC unit. To investigate and demonstrate the effectiveness of the proposed approach, a simulation based experimental analysis is presented using real-life pricing data. An actual prototype for the proposed HVAC load control strategy is then built and a series of prototype experiments are conducted similar to the simulation studies. The experiments reveal that the MPC strategy can lead to significant reductions in overall energy consumption and cost savings for the consumer. Results suggest that by providing an efficient response strategy for the consumers, the proposed MPC strategy can enable the utility providers to adopt efficient demand management policies using real-time pricing. Finally, a cost-benefit analysis is performed to display the economic feasibility of implementing such a controller as part of a building energy management system, and the payback period is identified considering cost of prototype build and cost savings to help the adoption of this controller in the building HVAC control industry.

  20. Thermal Protection System Aerothermal Screening Tests in HYMETS Facility

    Science.gov (United States)

    Szalai, Christine E.; Beck, Robin A. S.; Gasch, Matthew J.; Alumni, Antonella I.; Chavez-Garcia, Jose F.; Splinter, Scott C.; Gragg, Jeffrey G.; Brewer, Amy

    2011-01-01

    The Entry, Descent, and Landing (EDL) Technology Development Project has been tasked to develop Thermal Protection System (TPS) materials for insertion into future Mars Entry Systems. A screening arc jet test of seven rigid ablative TPS material candidates was performed in the Hypersonic Materials Environmental Test System (HYMETS) facility at NASA Langley Research Center, in both an air and carbon dioxide test environment. Recession, mass loss, surface temperature, and backface thermal response were measured for each test specimen. All material candidates survived the Mars aerocapture relevant heating condition, and some materials showed a clear increase in recession rate in the carbon dioxide test environment. These test results supported subsequent down-selection of the most promising material candidates for further development.

  1. Shielding Design and Radiation Shielding Evaluation for LSDS System Facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Younggook; Kim, Jeongdong; Lee, Yongdeok [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    As the system characteristics, the target in the spectrometer emits approximately 1012 neutrons/s. To efficiently shield the neutron, the shielding door designs are proposed for the LSDS system through a comparison of the direct shield and maze designs. Hence, to guarantee the radiation safety for the facility, the door design is a compulsory course of the development of the LSDS system. To improve the shielding rates, 250x250 covering structure was added as a subsidiary around the spectrometer. In this study, the evaluations of the suggested shielding designs were conducted using MCNP code. The suggested door design and covering structures can shield the neutron efficiently, thus all evaluations of all conditions are satisfied within the public dose limits. From the Monte Carlo code simulation, Resin(Indoor type) and Tungsten(Outdoor type) were selected as the shielding door materials. From a comparative evaluation of the door thickness, In and Out door thickness was selected 50 cm.

  2. Ultraviolet germicidal irradiation inactivation of airborne fungal spores and bacteria in upper-room air and HVAC in-duct configurations

    Energy Technology Data Exchange (ETDEWEB)

    Kujundzic, E.; Hernandez, M. [Colorado Univ., Boulder, CO (United States). Dept. of Civil, Environmental and Architectural Engineering; Miller, S.L. [Colorado Univ., Boulder, CO (United States). Dept. of Mechanical Engineering

    2007-01-15

    This article presented an evaluation of the efficiency of ultraviolet germicidal irradiation (UVGI) for inactivating airborne fungal spores and bacterial vegetative cells under 3 configurations, namely intrinsic, upper-room air, and in-duct. Several experiments were conducted in a pilot-scale chamber fitted with 4 corner ultraviolet lamps that irradiated the entire chamber; a full-scale room fitted with a UVGI system that irradiated the top 30 cm of the room; and, the supply air duct of a heating ventilation and air-conditioning (HVAC) system. Fungal spores and vegetative cells of bacterium were aerosolized regularly such that their numbers and physiologic state were comparable both with and without the UVGI lamps operating. The article provided information on the materials and methods used including the experimental facilities (pilot-scale chamber, full-scale room, and in-duct UVGI system and ductwork) as well as the methods used for the three experimental studies. It also discussed the bioaerosol generation and sampling and quantification. These included culturing and direct microscopy. UV fluence rate was described. Last, the the results, discussion and conclusions from the studies were presented. It was shown that increasing the air stream velocity through the supply air duct reduces the residence time of bioaerosol being exposed to in-duct UVGI. 36 refs., 3 figs.

  3. Cold Vacuum Drying facility civil structural system design description (SYS 06)

    Energy Technology Data Exchange (ETDEWEB)

    PITKOFF, C.C.

    1999-07-06

    This document describes the Cold Vacuum Drying (CVD) Facility civil - structural system. This system consists of the facility structure, including the administrative and process areas. The system's primary purpose is to provide for a facility to house the CVD process and personnel and to provide a tertiary level of containment. The document provides a description of the facility and demonstrates how the design meets the various requirements imposed by the safety analysis report and the design requirements document.

  4. Power consumption benchmark for a semiconductor cleanroom facility system

    Energy Technology Data Exchange (ETDEWEB)

    Hu, Shih-Cheng; Wu, Jen-Syua [Department of Energy and Refrigerating Air-Conditioning Engineering, National Taipei University of Technology, 1 Sec. 3, Chung-Hsiao E. Rd. Taipei 106 (China); Chan, David Yih-Liang; Hsu, Rich Tsung-Chi; Lee, Jane Car-Cheng [Energy and Environment Research Labs, Industrial Technology Research Institute, Bldg 51, 195 Sec. 4, Chung Hsing Rd, Chutung, Hinchu 106 (China)

    2008-07-01

    Benchmarking is an important step in implementing energy conservation in a semiconductor fabrication plant (hereafter referred to as ''fab''). A semiconductor cleanroom facility system is complicated, usually comprised of several sub-systems, such as a chilled water system, a make-up system, an exhaust air system, a compressed air system, a process cooling water (PCW) system, a nitrogen system, a vacuum system, and an ultra-pure water (UPW) system. It is a daunting task to allocate energy consumption and determine an optimum benchmark. This study aims to establish the energy benchmark of a typical 8-in. DRAM semiconductor fab through field measurement data. Results of the measured energy consumption index were: chilled water system (including chiller, chilled water pump and cooling tower): 0.257 kW/kW (=0.9 kW/RT) in summer and 0.245 kW/kW (=0.86 kW/RT) in winter air recirculation air system: 0.00018 kWh/m{sup 3} make-up air system: 0.0042 kWh/m{sup 3} general exhaust air system: 0.0007 kWh/m{sup 3} solvent exhaust air system: 0.0021 kWh/m{sup 3} acid exhaust air system: 0.0009 kWh/m{sup 3} alkaline exhaust air system: 0.0025 kWh/m{sup 3} nitrogen system: 0.2209 kWh/m{sup 3} compressed dry air system: 0.2250 kWh/m{sup 3} process cooling water system: 1.3535 kWh/m{sup 3} and ultra-pure water system: 9.5502 kWh/m{sup 3}. These data can be used to assess the efficiency of different energy-saving schemes and as a good reference for factory authorities. The PCW system's status before and after implementing energy conservation is discussed. (author)

  5. Improvements in detection system for pulse radiolysis facility

    CERN Document Server

    Rao, V N; Manimaran, P; Mishra, R K; Mohan, H; Mukherjee, T; Nadkarni, S A; Sapre, A V; Shinde, S J; Toley, M

    2002-01-01

    This report describes the improvements made in the detection system of the pulse radiolysis facility based on a 7 MeV Linear Electron Accelerator (LINAC) located in the Radiation Chemistry and Chemical Dynamics Division of Bhabha Atomic Research Centre. The facility was created in 1986 for kinetic studies of transient species whose absorption lies between 200 and 700 nm. The newly developed detection circuits consist of a silicon (Si) photodiode (PD) detector for the wavelength range 450-1100 nm and a germanium (Ge) photodiode detector for the wavelength range 900-1600 nm. With these photodiode-based detection set-up, kinetic experiments are now routinely carried out in the wavelength range 450-1600 nm. The performance of these circuits has been tested using standard chemical systems. The rise time has been found to be 150 ns. The photo-multiplier tube (PMT) bleeder circuit has been modified. A new DC back-off circuit has been built and installed in order to avoid droop at longer time scales. A steady baselin...

  6. Retrievable surface storage facility conceptual system design description

    Energy Technology Data Exchange (ETDEWEB)

    1977-03-01

    The studies evaluated several potentially attractive methods for processing and retrievably storing high-level radioactive waste after delivery to the Federal repository. These studies indicated that several systems could be engineered to safely store the waste, but that the simplest and most attractive concept from a technical standpoint would be to store the waste in a sealed stainless steel canister enclosed in a 2 in. thick carbon steel cask which in turn would be inserted into a reinforced concrete gamma-neutron shield, which would also provide the necessary air-cooling through an air annulus between the cask and the shield. This concept best satisfies the requirements for safety, long-term exposure to natural phenomena, low capital and operating costs, retrievability, amenability to incremental development, and acceptably small environmental impact. This document assumes that the reference site would be on ERDA's Hanford reservation. This document is a Conceptual System Design Description of the facilities which could satisfy all of the functional requirements within the established basic design criteria. The Retrievable Surface Storage Facility (RSSF) is planned with the capacity to process and store the waste received in either a calcine or glass/ceramic form. The RSSF planning is based on a modular development program in which the modular increments are constructed at rates matching projected waste receipts.

  7. Beam Diagnostics Systems For The National Ignition Facility

    CERN Document Server

    Demaret, R D; Bliss, E S; Gates, A J; Severyn, J R

    2001-01-01

    The National Ignition Facility laser focuses 1.8 Mega-joules of ultraviolet light (wavelength 351 nano-meters) from 192 beams into a 600-micro-meter-diameter volume. Effective use of this output in target experiments requires that the power output from all the beams match within 8% over their entire 20-nanosecond waveform. The scope of NIF beam diagnostics systems necessary to accomplish this task is unprecedented for laser facilities. Each beam line contains 110 major optical components distributed over a 510 meter path, and diagnostic tolerances for beam measurement are demanding. Total laser pulse energy is measured with 2.8% precision, and the inter-beam temporal variation of pulse power is measured with 4% precision. These measurement goals are achieved through use of approximately 160 sensor packages that measure the energy at five locations and power at 3 locations along each beamline using 335 photodiodes, 215 calorimeters and 36 digitizers. Successful operation of such a system requires a high level ...

  8. Status of the National Ignition Facility Integrated Computer Control System

    Energy Technology Data Exchange (ETDEWEB)

    Lagin, L; Bryant, R; Carey, R; Casavant, D; Edwards, O; Ferguson, W; Krammen, J; Larson, D; Lee, A; Ludwigsen, P; Miller, M; Moses, E; Nyholm, R; Reed, R; Shelton, R; Van Arsdall, P J; Wuest, C

    2003-10-13

    The National Ignition Facility (NIF), currently under construction at the Lawrence Livermore National Laboratory, is a stadium-sized facility containing a 192-beam, 1.8-Megajoule, 500-Terawatt, ultraviolet laser system together with a 10-meter diameter target chamber with room for nearly 100 experimental diagnostics. When completed, NIF will be the world's largest and most energetic laser experimental system, providing an international center to study inertial confinement fusion and the physics of matter at extreme energy densities and pressures. NIF's 192 energetic laser beams will compress fusion targets to conditions required for thermonuclear burn, liberating more energy than required to initiate the fusion reactions. Laser hardware is modularized into line replaceable units such as deformable mirrors, amplifiers, and multi-function sensor packages that are operated by the Integrated Computer Control System (ICCS). ICCS is a layered architecture of 300 front-end processors attached to nearly 60,000 control points and coordinated by supervisor subsystems in the main control room. The functional subsystems--beam control including automatic beam alignment and wavefront correction, laser pulse generation and pre-amplification, diagnostics, pulse power, and timing--implement automated shot control, archive data, and support the actions of fourteen operators at graphic consoles. Object-oriented software development uses a mixed language environment of Ada (for functional controls) and Java (for user interface and database backend). The ICCS distributed software framework uses CORBA to communicate between languages and processors. ICCS software is approximately 3/4 complete with over 750 thousand source lines of code having undergone off-line verification tests and deployed to the facility. NIF has entered the first phases of its laser commissioning program. NIF has now demonstrated the highest energy 1{omega}, 2{omega}, and 3{omega} beamlines in the world

  9. The LOBI Integral System Test Facility Experimental Programme

    Directory of Open Access Journals (Sweden)

    Carmelo Addabbo

    2012-01-01

    Full Text Available The LOBI project has been carried out in the framework of the European Commission Reactor Safety Research Programme in close collaboration with institutional and/or industrial research organizations of EC member countries. The primary objective of the research programme was the generation of an experimental data base for the assessment of the predictive capabilities of thermal-hydraulic system codes used in pressurised water reactor safety analysis. Within this context, experiments have been conducted in the LOBI integral system test facility designed, constructed, and operated (1979–1991 at the Ispra Site of the Joint Research Centre. This paper provides a historical perspective and summarizes major achievements of the research programme which has represented an effective approach to international collaboration in the field of reactor safety research and development. Emphasis is also placed on knowledge management aspects of the acquired experimental data base and on related online open access/retrieval user functionalities.

  10. 75 FR 18255 - Passenger Facility Charge Database System for Air Carrier Reporting

    Science.gov (United States)

    2010-04-09

    ... Federal Aviation Administration Passenger Facility Charge Database System for Air Carrier Reporting AGENCY... interested parties of the availability of the Passenger Facility Charge (PFC) database system to report PFC..., 2010. FOR FURTHER INFORMATION CONTACT: Jane Johnson, Financial Analysis and Passenger Facility Charge...

  11. Practical Guide to HVAC for Schools.

    Science.gov (United States)

    ASHRAE Journal, 1998

    1998-01-01

    Features six articles on heating, ventilation, and air-conditioning systems for schools. Examines how to avoid air temperature complaints when choosing a system; special system features; engineers, indoor air quality, and schools; mechanical systems noise in classrooms; operation and management issues related to design; and details on bids and…

  12. Automatic Alignment System for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Wilhlelmsen, K C; Awwal, A S; Ferguson, S W; Horowitz, B; Miller Kamm, V J; Reynolds, C A

    2007-10-04

    The automatic alignment system for the National Ignition Facility (NIF) is a large-scale parallel system that directs all 192 laser beams along the 300-m optical path to a 50-micron focus at target chamber in less than 30 minutes. The system commands 9,000 stepping motors to adjust mirrors and other optics. Twenty-two control loops per beamline request image processing services running on a LINUX cluster to analyze high-resolution images of the beam and references. Process-leveling assures the computational load is evenly spread on the cluster. Algorithms also estimate measurement accuracy and reject off-normal images. One challenge to achieving rapid alignment of beams in parallel is the efficient coordination of shared laser devices, such as sensors that are configurable to monitor multiple beams. Contention for shared resources is managed by the Component Mediation System, which precludes deadlocks and optimizes device motions using a hierarchical component structure. A reservation service provided by the software framework prevents interference from competing instances of automated controls or from the actions of system operators. The design, architecture and performance of the system will be discussed.

  13. Power Systems Development Facility Gasification Test Campaign TC17

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2004-11-30

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR (formerly Kellogg Brown & Root) Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results gasification operation with Illinois Basin bituminous coal in PSDF test campaign TC17. The test campaign was completed from October 25, 2004, to November 18, 2004. System startup and initial operation was accomplished with Powder River Basin (PRB) subbituminous coal, and then the system was transitioned to Illinois Basin coal operation. The major objective for this test was to evaluate the PSDF gasification process operational stability and performance using the Illinois Basin coal. The Transport Gasifier train was operated for 92 hours using PRB coal and for 221 hours using Illinois Basin coal.

  14. Potential of Computerized Maintenance Management System in Facilities Management

    OpenAIRE

    Noor Farisya Azahar; Md Azree Othuman Mydin

    2014-01-01

    For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the deliver...

  15. Design concept of radiation control system for the high intensity proton accelerator facility

    CERN Document Server

    Miyamoto, Y; Harada, Y; Ikeno, K

    2002-01-01

    Description is given for the characteristic radiation environment for the High Intensity Proton Accelerator Facility and the design concept of the radiation control system of it. The facility is a large scale accelerator complex consisting of high energy proton accelerators carrying the highest beam intensity in the world and the related experimental facilities and therefore provides various issues relevant to the radiation environment. The present report describes the specifications for the radiation control system for the facility, determined in consideration of these characteristics.

  16. Power Systems Development Facility Gasification Test Campaign TC22

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2008-11-01

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC22, the first test campaign using a high moisture lignite from Mississippi as the feedstock in the modified Transport Gasifier configuration. TC22 was conducted from March 24 to April 17, 2007. The gasification process was operated for 543 hours, increasing the total gasification operation at the PSDF to over 10,000 hours. The PSDF gasification process was operated in air-blown mode with a total of about 1,080 tons of coal. Coal feeder operation was challenging due to the high as-received moisture content of the lignite, but adjustments to the feeder operating parameters reduced the frequency of coal feeder trips. Gasifier operation was stable, and carbon conversions as high as 98.9 percent were demonstrated. Operation of the PCD and other support equipment such as the recycle gas compressor and ash removal systems operated reliably.

  17. Programmable Beam Spatial Shaping System for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Heebner, J; Borden, M; Miller, P; Hunter, S; Christensen, K; Scanlan, M; Haynam, C; Wegner, P; Hermann, M; Brunton, G; Tse, E; Awwal, A; Wong, N; Seppala, L; Franks, M; Marley, E; Wong, N; Seppala, L; Franks, M; Marley, E; Williams, K; Budge, T; Henesian, M; Stolz, C; Suratwala, T; Monticelli, M; Walmer, D; Dixit, S; Widmayer, C; Wolfe, J; Bude, J; McCarty, K; DiNicola, J M

    2011-01-21

    A system of customized spatial light modulators has been installed onto the front end of the laser system at the National Ignition Facility (NIF). The devices are capable of shaping the beam profile at a low-fluence relay plane upstream of the amplifier chain. Their primary function is to introduce 'blocker' obscurations at programmed locations within the beam profile. These obscurations are positioned to shadow small, isolated flaws on downstream optical components that might otherwise limit the system operating energy. The modulators were designed to enable a drop-in retrofit of each of the 48 existing Pre Amplifier Modules (PAMs) without compromising their original performance specifications. This was accomplished by use of transmissive Optically Addressable Light Valves (OALV) based on a Bismuth Silicon Oxide photoconductive layer in series with a twisted nematic liquid crystal (LC) layer. These Programmable Spatial Shaper packages in combination with a flaw inspection system and optic registration strategy have provided a robust approach for extending the operational lifetime of high fluence laser optics on NIF.

  18. Power Systems Development Facility Gasification Test Campaing TC18

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2005-08-31

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device (PCD), advanced syngas cleanup systems, and high pressure solids handling systems. This report details Test Campaign TC18 of the PSDF gasification process. Test campaign TC18 began on June 23, 2005, and ended on August 22, 2005, with the gasifier train accumulating 1,342 hours of operation using Powder River Basin (PRB) subbituminous coal. Some of the testing conducted included commissioning of a new recycle syngas compressor for gasifier aeration, evaluation of PCD filter elements and failsafes, testing of gas cleanup technologies, and further evaluation of solids handling equipment. At the conclusion of TC18, the PSDF gasification process had been operated for more than 7,750 hours.

  19. Power Systems Development Facility Gasification Test Run TC09

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2002-09-30

    This report discusses Test Campaign TC09 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed gasifier designed to operate as either a combustor or a gasifier in air- or oxygen-blown mode of operation using a particulate control device (PCD). The Transport Gasifier was operated as a pressurized gasifier during TC09 in air- and oxygen-blown modes. Test Run TC09 was started on September 3, 2002, and completed on September 26, 2002. Both gasifier and PCD operations were stable during the test run, with a stable baseline pressure drop. The oxygen feed supply system worked well and the transition from air to oxygen was smooth. The gasifier temperature varied between 1,725 and 1,825 F at pressures from 125 to 270 psig. The gasifier operates at lower pressure during oxygen-blown mode due to the supply pressure of the oxygen system. In TC09, 414 hours of solid circulation and over 300 hours of coal feed were attained with almost 80 hours of pure oxygen feed.

  20. Shuttle infrared telescope facility pointing and control system

    Science.gov (United States)

    Lorell, K. R.; Barrows, W. F.; Matsumoto, Y. T.

    1981-01-01

    The Shuttle Infrared Telescope Facility (SIRTF) is being designed as a 0.85 m cryogenically cooled telescope capable of a three order of magnitude improvement over currently available infrared instruments. The SIRTF requires that the image at the focal plane be stabilized to better than 0.25 arcsec with an absolute accuracy of 1.0 arcsec. Current pointing-mount performance simulations indicate that neither of these requirements can be met without additional stabilization. The SIRTF pointing and control system will utilize gyro outputs, star field position measurements from a focal plane fine guidance sensor, and a steerable secondary mirror to provide the necessary stabilization and pointing control. The charge coupled device fine guidance sensor tracks multiple stars simultaneously and, through the use of multistar processing algorithms in a high performance microcomputer, generates three-axis attitude errors and gyro-drift estimates to correct the pointing-mount gyros. A high-bandwidth feedforward loop, driven directly from the pointing-mount gyro package, controls the steering mirror in order to correct disturbances not compensated for by the pointing-mount control system. A prototype design for the SIRTF pointing and control system is described in detail. Performance analyses made using a digital simulation of the pointing and control system as well as experimental data obtained in laboratory and field test measurements are presented.

  1. Database design for Physical Access Control System for nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sathishkumar, T., E-mail: satishkumart@igcar.gov.in; Rao, G. Prabhakara, E-mail: prg@igcar.gov.in; Arumugam, P., E-mail: aarmu@igcar.gov.in

    2016-08-15

    Highlights: • Database design needs to be optimized and highly efficient for real time operation. • It requires a many-to-many mapping between Employee table and Doors table. • This mapping typically contain thousands of records and redundant data. • Proposed novel database design reduces the redundancy and provides abstraction. • This design is incorporated with the access control system developed in-house. - Abstract: A (Radio Frequency IDentification) RFID cum Biometric based two level Access Control System (ACS) was designed and developed for providing access to vital areas of nuclear facilities. The system has got both hardware [Access controller] and software components [server application, the database and the web client software]. The database design proposed, enables grouping of the employees based on the hierarchy of the organization and the grouping of the doors based on Access Zones (AZ). This design also illustrates the mapping between the Employee Groups (EG) and AZ. By following this approach in database design, a higher level view can be presented to the system administrator abstracting the inner details of the individual entities and doors. This paper describes the novel approach carried out in designing the database of the ACS.

  2. Elementary Analysis on the Technological Features of an Engineering Equipment Facile Diagnosis System

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    From the point of systemic engineering, the general properties of an engineering equipment fault diagnosis system and the studying object of diagnosis engineering were discussed. With the developing course of fault diagnosis technology, the relationship be-tween facile diagnosis system and diagnosis engineering were also discussed. The basic structure and feature of a facile diagnosis system were discussed, and the isomorphic of a facile diagnosis system and precise diagnosis system was presented. The facile diagnosis requires the perfection of method, pertinence and apriority of knowledge , adaptability of the object being diagnosed and the approach to the aim of the diagnosis result, as well as the outstanding of main functions.

  3. Multiwavelength interferometry system for the Orion laser facility.

    Science.gov (United States)

    Patankar, S; Gumbrell, E T; Robinson, T S; Lowe, H F; Giltrap, S; Price, C J; Stuart, N H; Kemshall, P; Fyrth, J; Luis, J; Skidmore, J W; Smith, R A

    2015-12-20

    We report on the design and testing of a multiwavelength interferometry system for the Orion laser facility based upon the use of self-path matching Wollaston prisms. The use of UV corrected achromatic optics allows for both easy alignment with an eye-safe light source and small (∼ millimeter) offsets to the focal lengths between different operational wavelengths. Interferograms are demonstrated at wavelengths corresponding to first, second, and fourth harmonics of a 1054 nm Nd:glass probe beam. Example data confirms the broadband achromatic capability of the imaging system with operation from the UV (263 nm) to visible (527 nm) and demonstrates that features as small as 5 μm can be resolved for object sizes of 15 by 10 mm. Results are also shown for an off-harmonic wavelength that will underpin a future capability. The primary optics package is accommodated inside the footprint of a ten-inch manipulator to allow the system to be deployed from a multitude of viewing angles inside the 4 m diameter Orion target chamber.

  4. The Wavefront Control System for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Van Atta, L; Perez, M; Zacharias, R; Rivera, W

    2001-10-15

    The National Ignition Facility (NIF) requires that pulses from each of the 192 laser beams be positioned on target with an accuracy of 50 {micro}m rms. Beam quality must be sufficient to focus a total of 1.8 MJ of 0.351-{micro}m light into a 600-{micro}m-diameter volume. An optimally flat beam wavefront can achieve this pointing and focusing accuracy. The control system corrects wavefront aberrations by performing closed-loop compensation during laser alignment to correct for gas density variations. Static compensation of flashlamp-induced thermal distortion is established just prior to the laser shot. The control system compensates each laser beam at 10 Hz by measuring the wavefront with a 77-lenslet Hartmann sensor and applying corrections with a 39-actuator deformable mirror. The distributed architecture utilizes SPARC AXi computers running Solaris to perform real-time image processing of sensor data and PowerPC-based computers running VxWorks to compute mirror commands. A single pair of SPARC and PowerPC processors accomplishes wavefront control for a group of eight beams. The software design uses proven adaptive optic control algorithms that are implemented in a multi-tasking environment to economically control the beam wavefronts in parallel. Prototype tests have achieved a closed-loop residual error of 0.03 waves rms. aberrations, the spot size requirement and goal could not be met without a wavefront control system.

  5. The Injection Laser System on the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Bowers, M; Burkhart, S; Cohen, S; Erbert, G; Heebner, J; Hermann, M; Jedlovec, D

    2006-12-13

    The National Ignition Facility (NIF) is currently the largest and most energetic laser system in the world. The main amplifiers are driven by the Injection Laser System comprised of the master oscillators, optical preamplifiers, temporal pulse shaping and spatial beam formatting elements and injection diagnostics. Starting with two fiber oscillators separated by up to a few angstroms, the pulse is phase modulated to suppress SBS and enhance spatial smoothing, amplified, split into 48 individual fibers, and then temporally shaped by an arbitrary waveform generator. Residual amplitude modulation induced in the preamplifiers from the phase modulation is also precompensated in the fiber portion of the system before it is injected into the 48 pre-amplifier modules (PAMs). Each of the PAMs amplifies the light from the 1 nJ fiber injection up to the multi-joule level in two stages. Between the two stages the pre-pulse is suppressed by 60 dB and the beam is spatially formatted to a square aperture with precompensation for the nonuniform gain profile of the main laser. The input sensor package is used to align the output of each PAM to the main laser and acquire energy, power, and spatial profiles for all shots. The beam transport sections split the beam from each PAM into four main laser beams (with optical isolation) forming the 192 beams of the NIF. Optical, electrical, and mechanical design considerations for long term reliability and availability will be discussed.

  6. Lightning Protection System for HE Facilities at LLNL - Certification Template

    Energy Technology Data Exchange (ETDEWEB)

    Clancy, T J; Ong, M M; Brown, C G

    2005-12-08

    This document is meant as a template to assist in the development of your own lighting certification process. Aside from this introduction and the mock representative name of the building (Building A), this document is nearly identical to a lightning certification report issued by the Engineering Directorate at Lawrence Livermore National Laboratory. At the date of this release, we have certified over 70 HE processing and storage cells at our Site 300 facilities. In Chapters 1 and 2 respectively, we address the need and methods of lightning certification for HE processing and storage facilities at LLNL. We present the preferred method of lightning protection in Chapter 3, as well as the likely building modifications that are needed to comply with this method. In Chapter 4, we present the threat assessment and resulting safe work areas within a cell. After certification, there may be changes to operations during a lightning alert, and this is discussed in Chapter 5. Chapter 6 lists the maintenance requirements for the continuation of lighting certification status. Appendices of this document are meant as an aid in developing your own certification process, and they include a bonding list, an inventory of measurement equipment, surge suppressors in use at LLNL, an Integrated Work and Safety form (IWS), and a template certification sign-off sheet. The lightning certification process involves more that what is spelled out in this document. The first steps involve considerable planning, the securing of funds, and management and explosives safety buy-in. Permits must be obtained, measurement equipment must be assembled and tested, and engineers and technicians must be trained in their use. Cursory building inspections are also recommended, and surge suppression for power systems must be addressed. Upon completion of a certification report and its sign-off by management, additional work is required. Training will be needed in order to educate workers and facility managers

  7. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Science.gov (United States)

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.806 What is an IRR Transportation Facilities Maintenance Management System? An IRR Transportation Facilities Maintenance Management... 25 Indians 1 2010-04-01 2010-04-01 false What is an IRR Transportation Facilities...

  8. Power Systems Development Facility Gasification Test Campaign TC25

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2008-12-01

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC25, the second test campaign using a high moisture lignite coal from the Red Hills mine in Mississippi as the feedstock in the modified Transport Gasifier configuration. TC25 was conducted from July 4, 2008, through August 12, 2008. During TC25, the PSDF gasification process operated for 742 hours in air-blown gasification mode. Operation with the Mississippi lignite was significantly improved in TC25 compared to the previous test (TC22) with this fuel due to the addition of a fluid bed coal dryer. The new dryer was installed to dry coals with very high moisture contents for reliable coal feeding. The TC25 test campaign demonstrated steady operation with high carbon conversion and optimized performance of the coal handling and gasifier systems. Operation during TC25 provided the opportunity for further testing of instrumentation enhancements, hot gas filter materials, and advanced syngas cleanup technologies. The PSDF site was also made available for testing of the National Energy Technology Laboratory's fuel cell module and Media Process Technology's hydrogen selective membrane with syngas from the Transport Gasifier.

  9. Power Systems Development Facility Gasification Test Campaign TC25

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2008-12-01

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC25, the second test campaign using a high moisture lignite coal from the Red Hills mine in Mississippi as the feedstock in the modified Transport Gasifier configuration. TC25 was conducted from July 4, 2008, through August 12, 2008. During TC25, the PSDF gasification process operated for 742 hours in air-blown gasification mode. Operation with the Mississippi lignite was significantly improved in TC25 compared to the previous test (TC22) with this fuel due to the addition of a fluid bed coal dryer. The new dryer was installed to dry coals with very high moisture contents for reliable coal feeding. The TC25 test campaign demonstrated steady operation with high carbon conversion and optimized performance of the coal handling and gasifier systems. Operation during TC25 provided the opportunity for further testing of instrumentation enhancements, hot gas filter materials, and advanced syngas cleanup technologies. The PSDF site was also made available for testing of the National Energy Technology Laboratory's fuel cell module and Media Process Technology's hydrogen selective membrane with syngas from the Transport Gasifier.

  10. A UAV system for inspection of industrial facilities

    Science.gov (United States)

    Nikolic, J.; Burri, M.; Rehder, J.; Leutenegger, S.; Huerzeler, C.; Siegwart, R.

    This work presents a small-scale Unmanned Aerial System (UAS) capable of performing inspection tasks in enclosed industrial environments. Vehicles with such capabilities have the potential to reduce human involvement in hazardous tasks and can minimize facility outage periods. The results presented generalize to UAS exploration tasks in almost any GPS-denied indoor environment. The contribution of this work is twofold. First, results from autonomous flights inside an industrial boiler of a power plant are presented. A lightweight, vision-aided inertial navigation system provides reliable state estimates under difficult environmental conditions typical for such sites. It relies solely on measurements from an on-board MEMS inertial measurement unit and a pair of cameras arranged in a classical stereo configuration. A model-predictive controller allows for efficient trajectory following and enables flight in close proximity to the boiler surface. As a second contribution, we highlight ongoing developments by displaying state estimation and structure recovery results acquired with an integrated visual/inertial sensor that will be employed on future aerial service robotic platforms. A tight integration in hardware facilitates spatial and temporal calibration of the different sensors and thus enables more accurate and robust ego-motion estimates. Comparison with ground truth obtained from a laser tracker shows that such a sensor can provide motion estimates with drift rates of only few centimeters over the period of a typical flight.

  11. Power Systems Development Facility Gasification Test Run TC11

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2003-04-30

    This report discusses Test Campaign TC11 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed gasifier designed to operate as either a combustor or a gasifier in air- or oxygen-blown mode of operation using a particulate control device (PCD). Test run TC11 began on April 7, 2003, with startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until April 18, 2003, when a gasifier upset forced the termination of the test run. Over the course of the entire test run, gasifier temperatures varied between 1,650 and 1,800 F at pressures from 160 to 200 psig during air-blown operations and around 135 psig during enriched-air operations. Due to a restriction in the oxygen-fed lower mixing zone (LMZ), the majority of the test run featured air-blown operations.

  12. Optimized MBR for greywater reuse systems in hotel facilities.

    Science.gov (United States)

    Atanasova, Natasa; Dalmau, Montserrat; Comas, Joaquim; Poch, Manel; Rodriguez-Roda, Ignasi; Buttiglieri, Gianluigi

    2017-05-15

    Greywater is an important alternative water source, particularly in semi-arid, touristic areas, where the biggest water demand is usually in the dry period. By using this source wisely, tourist facilities can substantially reduce the pressure to scarce water resources. In densely urbanized touristic areas, where space has high value, compact solutions such as MBR based greywater reuse systems appear very appropriate. This research focuses on technical and economical evaluation of such solution by implementing a pilot MBR to a hotel with separated grey water. The pilot was operated for 6 months, with thorough characterisation of the GW performed, its operation was monitored and its energy consumption was optimized by applying a control system for the air scour. Based on the pilot operation a design and economic model was set to estimate the feasibility (CAPEX, OPEX, payback period of investment) of appropriate scales of MBR based GW systems, including separation of GW, MBR technology, clean water storage and disinfection. The model takes into account water and energy prices in Spain and a planning period of 20 years. The results demonstrated an excellent performance in terms of effluent quality, while the energy demand for air-scour was reduced by up to 35.2%, compared to the manufacturer recommendations. Economical evaluation of the entire MBR based GW reuse system shows its feasibility for sizes already at 5 m(3)/day (60 PE). The payback period of the investment for hotels like the demonstration hotel, treating 30 m(3)/day is 3 years.

  13. Power Systems Development Facility Gasification Test Run TC08

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2002-06-30

    This report discusses Test Campaign TC08 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed gasifier designed to operate as either a combustor or a gasifier in air- or oxygen-blown mode using a particulate control device (PCD). The Transport Gasifier was operated as a pressurized gasifier in air- and oxygen-blown modes during TC08. Test Run TC08 was started on June 9, 2002 and completed on June 29. Both gasifier and PCD operations were stable during the test run with a stable baseline pressure drop. The oxygen feed supply system worked well and the transition from air to oxygen blown was smooth. The gasifier temperature was varied between 1,710 and 1,770 F at pressures from 125 to 240 psig. The gasifier operates at lower pressure during oxygen-blown mode due to the supply pressure of the oxygen system. In TC08, 476 hours of solid circulation and 364 hours of coal feed were attained with 153 hours of pure oxygen feed. The gasifier and PCD operations were stable in both enriched air and 100 percent oxygen blown modes. The oxygen concentration was slowly increased during the first transition to full oxygen-blown operations. Subsequent transitions from air to oxygen blown could be completed in less than 15 minutes. Oxygen-blown operations produced the highest synthesis gas heating value to date, with a projected synthesis gas heating value averaging 175 Btu/scf. Carbon conversions averaged 93 percent, slightly lower than carbon conversions achieved during air-blown gasification.

  14. Power Systems Development Facility Gasification Test Campaign TC24

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2008-03-30

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This report summarizes the results of TC24, the first test campaign using a bituminous coal as the feedstock in the modified Transport Gasifier configuration. TC24 was conducted from February 16, 2008, through March 19, 2008. The PSDF gasification process operated for about 230 hours in air-blown gasification mode with about 225 tons of Utah bituminous coal feed. Operational challenges in gasifier operation were related to particle agglomeration, a large percentage of oversize coal particles, low overall gasifier solids collection efficiency, and refractory degradation in the gasifier solids collection unit. The carbon conversion and syngas heating values varied widely, with low values obtained during periods of low gasifier operating temperature. Despite the operating difficulties, several periods of steady state operation were achieved, which provided useful data for future testing. TC24 operation afforded the opportunity for testing of various types of technologies, including dry coal feeding with a developmental feeder, the Pressure Decoupled Advanced Coal (PDAC) feeder; evaluating a new hot gas filter element media configuration; and enhancing syngas cleanup with water-gas shift catalysts. During TC24, the PSDF site was also made available for testing of the National Energy Technology Laboratory's fuel cell module and Media Process Technology's hydrogen selective membrane.

  15. National Pollution Discharge Elimination System (NPDES) Facility Points, Region 9, 2007, US EPA Region 9

    Data.gov (United States)

    U.S. Environmental Protection Agency — Point geospatial dataset representing locations of NPDES Facilities. NPDES (National Pollution Discharge Elimination System) is an EPA permit program that regulates...

  16. Simulation of mass storage systems operating in a large data processing facility

    Science.gov (United States)

    Holmes, R.

    1972-01-01

    A mass storage simulation program was written to aid system designers in the design of a data processing facility. It acts as a tool for measuring the overall effect on the facility of on-line mass storage systems, and it provides the means of measuring and comparing the performance of competing mass storage systems. The performance of the simulation program is demonstrated.

  17. Joint HVAC transmission EMF environmental study

    Energy Technology Data Exchange (ETDEWEB)

    Stormshak, F.; Thompson, J. (Oregon State Univ., Corvallis, OR (United States))

    1992-05-01

    This document describes the rationale, procedures, and results of a carefully controlled study conducted to establish whether chronic exposure of female (ewe) Suffolk lambs to the environment of a 500-kV 60-Hz transmission line would affect various characteristics of growth, endocrine function, and reproductive development. This experiment used identical housing and management schemes for control and line-exposed ewes, thus minimizing these factors as contributors to between-group experimental error. Further, throughout the 10-month duration of this study, changes in electric and magnetic fields, audible noise, and weather conditions were monitored continuously by a computerized system. Such measurements provided the opportunity to identify any relationship between environmental factors and biological responses. Because of reports in the literature that electric and magnetic fields alter concentrations of melatonin in laboratory animals, the primary objective of this study was to ascertain whether a similar effect occurs in lambs exposed to a 500-kV a-c line in a natural setting. In addition, onset of puberty, changes in body weight, wool growth, and behavior were monitored. To determine whether the environment of a 500-kV line caused stress in the study animals, serum levels of cortisol were measured. The study was conducted at Bonneville Power Administration's Ostrander Substation near Estacada, Oregon.

  18. 78 FR 18353 - Guidance for Industry: Blood Establishment Computer System Validation in the User's Facility...

    Science.gov (United States)

    2013-03-26

    ... HUMAN SERVICES Food and Drug Administration Guidance for Industry: Blood Establishment Computer System... ``Guidance for Industry: Blood Establishment Computer System Validation in the User's Facility'' dated April... establishment computer system validation program, consistent with recognized principles of software...

  19. Power Systems Development Facility Gasification Test Run TC07

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2002-04-05

    This report discusses Test Campaign TC07 of the Kellogg Brown & Root, Inc. (KBR) Transport Reactor train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Reactor is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). The Transport Reactor was operated as a pressurized gasifier during TC07. Prior to TC07, the Transport Reactor was modified to allow operations as an oxygen-blown gasifier. Test Run TC07 was started on December 11, 2001, and the sand circulation tests (TC07A) were completed on December 14, 2001. The coal-feed tests (TC07B-D) were started on January 17, 2002 and completed on April 5, 2002. Due to operational difficulties with the reactor, the unit was taken offline several times. The reactor temperature was varied between 1,700 and 1,780 F at pressures from 200 to 240 psig. In TC07, 679 hours of solid circulation and 442 hours of coal feed, 398 hours with PRB coal and 44 hours with coal from the Calumet mine, and 33 hours of coke breeze feed were attained. Reactor operations were problematic due to instrumentation problems in the LMZ resulting in much higher than desired operating temperatures in the reactor. Both reactor and PCD operations were stable and the modifications to the lower part of the gasifier performed well while testing the gasifier with PRB coal feed.

  20. Development techniques of computerized maintenance management system for nuclear fuel cycle examination facilities

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Yon Woo; Kim, S. D.; Soong, W. S.; Kim, G. H.; Oh, W. H.; Kim, Y. G

    2000-12-01

    Normal operation of the facility is one of the key factors in the accomplishments of research goals. As confirmed by a case study of the influence of the facility operation condition on the research results, emphasis should be put on the facility preserve management. Facilities should be maintained in solid operational condition and their malfunctions should be repaired as soon as possible. The purpose of this project is to make propositions on the development of the facility Preserve management system which is to maximize the efficiency of the budget execution, manpower organization and maintenance planning, and is to minimize the duration of the operational pause due to malfunctions with the least disbursement.

  1. Ventilation system of actinides handling facility in Oarai-branch of Tohoku University

    Energy Technology Data Exchange (ETDEWEB)

    Suzuki, Yoshimitsu; Watanabe, Makoto; Hara, Mituo; Shikama, Tatsuo; Kayano, Hideo; Mitsugashira, Toshiaki [Oarai Branch, Institute for Materials Research, Tohoku Univ., Oarai, Ibaraki (Japan)

    1999-09-01

    We have reported the development of the facility for handling actinides in Tohoku University at the second KAERI-JAERI joint seminar on PIE technology. Actinide isotopes have most hazurdous {alpha}-radioactivity. Therefore, a specially designed facility is necessary to carry out experimental study for actinide physics and chemistry. In this paper, we will describe the ventilation system and monitoring system for actinide handling facility. (author)

  2. Advanced Energy Design Guide for Small Hospitals and Healthcare Facilities

    Directory of Open Access Journals (Sweden)

    Eric Bonnema

    2010-01-01

    Full Text Available The Advanced Energy Design Guide for Small Hospitals and Healthcare Facilities (AEDG-SHC was recently completed. It is the sixth document in a series of guides designed to achieve 30% savings over the minimum code requirements of ANSI/ASHRAE/IESNA Standard 90.1-1999. The guide [1] is available for print purchase or as a free download from http://www.ashrae.org/aedg and provides user-friendly assistance and recommendations for the building design, construction, and owner communities to achieve energy savings. Included in the guide are prescriptive recommendations for quality assurance and commissioning; design of the building envelope; fenestration; lighting systems (including electric lighting and daylighting; heating, ventilation, and air-conditioning (HVAC systems; building automation and controls; outside air (OA treatment; and service water heating (SWH. The guide educates, provides practical recommendations for exceeding code minimums, and provides leadership to help design teams and owners produce higher efficiency commercial buildings.

  3. Report on emergency electrical power supply systems for nuclear fuel cycle and reactor facilities security systems

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The report includes information that will be useful to those responsible for the planning, design and implementation of emergency electric power systems for physical security and special nuclear materials accountability systems. Basic considerations for establishing the system requirements for emergency electric power for security and accountability operations are presented. Methods of supplying emergency power that are available at present and methods predicted to be available in the future are discussed. The characteristics of capacity, cost, safety, reliability and environmental and physical facility considerations of emergency electric power techniques are presented. The report includes basic considerations for the development of a system concept and the preparation of a detailed system design.

  4. System model of a natural circulation integral test facility

    Science.gov (United States)

    Galvin, Mark R.

    The Department of Nuclear Engineering and Radiation Health Physics (NE/RHP) at Oregon State University (OSU) has been developing an innovative modular reactor plant concept since being initiated with a Department of Energy (DoE) grant in 1999. This concept, the Multi-Application Small Light Water Reactor (MASLWR), is an integral pressurized water reactor (PWR) plant that utilizes natural circulation flow in the primary and employs advanced passive safety features. The OSU MASLWR test facility is an electrically heated integral effects facility, scaled from the MASLWR concept design, that has been previously used to assess the feasibility of the concept design safety approach. To assist in evaluating operational scenarios, a simulation tool that models the test facility and is based on both test facility experimental data and analytical methods has been developed. The tool models both the test facility electric core and a simulated nuclear core, allowing evaluation of a broad spectrum of operational scenarios to identify those scenarios that should be explored experimentally using the test facility or design-quality multi-physics tools. Using the simulation tool, the total cost of experimentation and analysis can be reduced by directing time and resources towards the operational scenarios of interest.

  5. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  6. Fingerprint testing of contaminated ventilation extract filter systems at Sizewell B

    Energy Technology Data Exchange (ETDEWEB)

    Meddings, P.; Patel, S. [Nuclear Electric plc, Barnwood (United Kingdom)

    1996-06-01

    Sizewell B is Nuclear Electric`s latest power station, and the Pressurised Water Reactor (PWR) design on which it is based represents a ``first`` for the UK. One of the integral components of the plant is the heating, ventilation and air-conditioning (HVAC) system, which performs a contamination control and gaseous waste management function for the site. During the commissioning of Sizewell B Power Station the extract systems of the HVAC plant underwent a procedure known as ``fingerprinting``. This entailed the characterisation of the facilities provided to test the filtration plant during its lifetime. The assessment of their adequacy was then used to identify necessary modifications and/or to propose the manner in which future in situ performance testing would be carried out. The paper outlines the basic principles and procedure that was used to ``fingerprint`` test systems during the commissioning of Sizewell B. A specific example is presented to demonstrate the process. (UK).

  7. 47 CFR 74.795 - Digital low power TV and TV translator transmission system facilities.

    Science.gov (United States)

    2010-10-01

    ... translator transmission system facilities. (a) A digital low power TV or TV translator station shall operate... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator transmission system facilities. 74.795 Section 74.795 Telecommunication FEDERAL COMMUNICATIONS...

  8. 公共建筑项目中暖通空调专业的绿色设计%The Green Design of HVAC in Public Building Projects

    Institute of Scientific and Technical Information of China (English)

    李林

    2012-01-01

    室内环境质量、节能与能源利用与暖通空调专业紧密相关的。在设计阶段,室内设计参数决定着室内环境质量,而围护结构的热工性能和暖通空调系统设计直接决定着绿色建筑中节能与能源利用。本文对绿色建筑项目中的暖通空调设计做了初步探讨,旨在为绿色建筑项目中的暖通空调设计提供一定的指导。在项目设计中,不仅需要选择节能型的设备、设计合理的系统形式,还需与建筑师共同探讨建筑围护结构的热工性能,同时还需根据项目所在地的情况做到因地制宜,切忌盲目使用可再生能源。%The quality of indoor environmental,energy conservation and energy use are closely related to HVAC.In the design phase,indoor environmental quality is determined by the design parameters,and the thermal performance of building envelope and HVAC system directly determines the design of energy-efficient and energy use in green buildings.In this paper,preliminary study has been discussed in the HVAC design for green building project to provide some design guidance in HVAC.In order to save real energy in HVAC design,energy-efficient HVAC equipment isn't only need to be chosen in projects,but also reasonable system design and the building envelope thermal performance with the architect should be considered.Meanwhile the use of renewable energy is needed to be based on the situation of project and the local conditions,renewable energy should not be ill-used.

  9. The operation of post-irradiation examination facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Eun Ka; Min, Duk Ki; Lee, Young Kil [and others] [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-12-01

    The operation of post-irradiation examination facility was performed as follow. HVAC and pool water treatment system were continuously operated, and radiation monitoring in PIE facility has been carried out to maintain the facility safely. Inspection of the fuel assembly (F02) transported from Kori Unit 1 was performed in pool, and fuel rods extracted from the fuel assembly (J44) of Kori Unit 2 NPP were examined in hot cell. A part of deteriorated pipe line of drinking water was exchanged for stainless steel pipe to prevent leaking accidents. Halon gas system was also installed in the exhausting blower room for fire fighting. And IAEA inspection camera for safeguard of nuclear materials was fixed at the wall in pool area. Radiation monitoring system were improved to display the area radioactive value at CRT monitor in health physics control room. And automatic check system for battery and emergency diesel generator was developed to measure the voltage and current of them. The performance test of oxide thickness measuring device installed in hot cell for irradiated fuel rod and improvement of the device were performed, and good measuring results using standard sample were obtained. The safeguard inspection of nuclear materials and operation inspection of the facility were carried out through the annual operation inspection, quarterly IAEA inspection and quality assurance auditing. 26 tabs., 43 figs., 14 refs. (Author) .new.

  10. Design concept of radiation control system for the high intensity proton accelerator facility

    Energy Technology Data Exchange (ETDEWEB)

    Miyamoto, Yukihiro; Ikeno, Koichi; Akiyama, Shigenori; Harada, Yasunori [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-11-01

    Description is given for the characteristic radiation environment for the High Intensity Proton Accelerator Facility and the design concept of the radiation control system of it. The facility is a large scale accelerator complex consisting of high energy proton accelerators carrying the highest beam intensity in the world and the related experimental facilities and therefore provides various issues relevant to the radiation environment. The present report describes the specifications for the radiation control system for the facility, determined in consideration of these characteristics. (author)

  11. HVAC concepts for the future; Klimatiseringsconcepten voor de toekomst

    Energy Technology Data Exchange (ETDEWEB)

    Verkerk-Evers, J.E.J.; Struck, C.; Hensen, J.L.M. [Technische Universiteit Eindhoven, Eindhoven (Netherlands); Van Herpen, R.A.P. [Adviesburo Nieman, Utrecht (Netherlands); Wijsman, A.J.Th.M.; Plokker, W. [VABI Software, Delft (Netherlands)

    2010-07-15

    HVAC installations, for example for office buildings, are in practice designed using computer simulations that rely on 40 year old weather data (1964-1965). This is already giving rise to comfort complaints in hot summer weather. A different approach to design is required if buildings are to continue performing well into the future. This problem was the subject of the graduation study reviewed in this article. [Dutch] Klimaatinstallaties in bijvoorbeeld kantoren worden in de praktijk ontworpen op basis van computersimulaties, waarbij gebruik wordt gemaakt van ruim 40 jaar oude weergegevens (1964-1965). In warme zomers zijn er nu al vaak comfortklachten. Om gebouwen te kunnen realiseren die ook in de toekomst goed blijven presteren is een andere benadering bij het ontwerpen nodig. Deze problematiek is het onderwerp geweest van een afstudeeronderzoek aan de Technische Universiteit Eindhoven, in samenwerking met Adviesburo Nieman en Vabi Software, dat in dit artikel wordt besproken.

  12. Decomposition of formaldehyde by EPD photocatalyst filters in HVAC

    Institute of Scientific and Technical Information of China (English)

    Chien-Chih Chen; Ching-Song Jwo; Tun-Ping Teng

    2011-01-01

    This study used electrophoretic deposition (EPD) to apply titanium oxide (TiO2) coating on stainless steel filters and investigated the effectiveness of photocatalytic oxidation of formaldehyde by TiO2 under various conditions of heating ventilation air conditioning (HVAC).The results showed photocatalytic efficiency could reach 35.59% at 21 ℃ and 36.39% at 26℃ with 7 photocatalyst filters and 5 UVC lamps,the overall efficiency of formaldehyde removal of 52.37% at 21 ℃,and 56.8% at 26℃.By all experimental data can be found that the temperature for the photocatalytic performance is not obvious in the range of this study.

  13. Power Systems Development Facility Gasification Test Run TC10

    Energy Technology Data Exchange (ETDEWEB)

    Southern Company Services

    2002-12-30

    This report discusses Test Campaign TC10 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (Siemens Westinghouse) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed gasifier designed to operate as either a combustor or a gasifier in air- or oxygen-blown mode of operation using a particulate control device (PCD). The Transport Gasifier was operated as a pressurized gasifier during TC10 in air- (mainly for transitions and problematic operations) and oxygen-blown mode. Test Run TC10 was started on November 16, 2002, and completed on December 18, 2002. During oxygen-blown operations, gasifier temperatures varied between 1,675 and 1,825 F at pressures from 150 to 180 psig. After initial adjustments were made to reduce the feed rate, operations with the new fluidized coal feeder were stable with about half of the total coalfeed rate through the new feeder. However, the new fluidized-bed coal feeder proved to be difficult to control at low feed rates. Later the coal mills and original coal feeder experienced difficulties due to a high moisture content in the coal from heavy rains. Additional operational difficulties were experienced when several of the pressure sensing taps in the gasifier plugged. As the run progressed, modifications to the mills (to address processing the wet coal) resulted in a much larger feed size. This eventually resulted in the accumulation of large particles in the circulating solids causing operational instabilities in the standpipe and loop seal. Despite problems with the coal mills, coal feeder, pressure tap nozzles and the standpipe, the gasifier did experience short periods of stability during oxygenblown operations. During these periods, the syngas quality was high. During TC10, the gasifier gasified over 609 tons of Powder River Basin subbituminous coal and

  14. 三峡左岸电站暖通空调系统设计与运行%HVAC system design and operation of Three Gorges Left Bank Power Station

    Institute of Scientific and Technical Information of China (English)

    张晓华

    2012-01-01

    Presents the design features of the two central air conditioning systems and one main ventilation system of the power station and analyses their operation. According to characteristics of the zones served, No. 1 central air conditioning system is designed as an open system and supplies air with spherical nozzles in large spaces; No. 2 central air conditioning system is designed as a closed system with double loop pipelines; and both of them are equipped with sufficient stand-up devices for guaranteeing the systems' reliability. The main ventilation system uses the low-temperature gallery for cooling and supplies the cold air to air-conditioned areas by three-stage cascade fans after two-stage filtering.%介绍了三峡左岸电站的2个集中空调系统和1个主通风系统的设计特点,并分析了其运行情况.根据所服务区域的特点,1#集中空调系统设计为开式系统,大空间采用球形喷口送风;2#集中空调系统设计为闭式系统,采用双循环管路;为保证系统的可靠性,均考虑了足够的备用设备.主通风系统利用低温廊道降温,送风经两次过滤,由三级风机接力送入空调区域.

  15. Implementation Plans for a Systems Microbiology and Extremophile Research Facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiley, H. S.

    2009-04-20

    solve DOE problems. Recent advances in whole-genome sequencing for a variety of organisms and improvements in high-throughput instrumentation have contributed to a rapid transition of the biological research paradigm towards understanding biology at a systems level. As a result, biology is evolving from a descriptive to a quantitative, ultimately predictive science where the ability to collect and productively use large amounts of biological data is crucial. Understanding how the ensemble of proteins in cells gives rise to biological outcomes is fundamental to systems biology. These advances will require new technologies and approaches to measure and track the temporal and spatial disposition of proteins in cells and how networks of proteins and other regulatory molecules give rise to specific activities. The DOE has a strong interest in promoting the application of systems biology to understanding microbial function and this comprises a major focus of its Genomics:GTL program. A major problem in pursuing what has been termed “systems microbiology” is the lack of the facilities and infrastructure for conducting this new style of research. To solve this problem, the Genomics:GTL program has funded a number of large-scale research centers focused on either mission-oriented outcomes, such as bioenergy, or basic technologies, such as gene sequencing, high-throughput proteomics or the identification of protein complexes. Although these centers generate data that will be useful to the research community, their scientific goals are relatively narrow and are not designed to accommodate the general community need for advanced capabilities for systems microbiology research.

  16. Supernova survey system in Beijing Astronomical Observatory (Ⅰ)——Facilities of survey

    Institute of Scientific and Technical Information of China (English)

    裘予雷; 李卫东; 赵昭旺; 乔琪源; 饶勇; 胡景耀; 李启斌

    1999-01-01

    The robotic supernova survey system of Beijing Astronomical Observatory (BAO) is based on the 60-cm telescope of BAO, which includes a CCD camera attached to the prime focus and a software system for facility control and image reduction.

  17. Test facilities for evaluating nuclear thermal propulsion systems

    Science.gov (United States)

    Beck, David F.; Allen, George C.; Shipers, Larry R.; Dobranich, Dean; Ottinger, Cathy A.; Harmon, Charles D.; Fan, Wesley C.; Todosow, Michael

    1993-01-01

    Interagency panels evaluating nuclear thermal propulsion (NTP) development options have consistently recognized the need for constructing a major new ground test facility to support fuel element and engine testing. This paper summarizes the requirements, configuration, and baseline performance of some of the major subsystems designed to support a proposed ground test complex for evaluating nuclear thermal propulsion fuel elements and engines being developed for the Space Nuclear Thermal Propulsion (SNTP) program. Some preliminary results of evaluating this facility for use in testing other NTP concepts are also summarized.

  18. HVAC system design of liquid desiccant fresh air unit combined with ground-source heat pump%溶液调湿新风机组与地源热泵相结合的空调设计

    Institute of Scientific and Technical Information of China (English)

    张伟程; 滕汜颖

    2013-01-01

    以上海虹桥产业楼空调系统为例,介绍了溶液调湿新风机组与地源热泵系统的设计,重点介绍了干式末端设备、冷热源主机、地埋管系统、空调水系统及自控系统设计的要点.根据实际运行调试情况,对冷热源水系统、干式风机盘管、高温型地源热泵机组、免费冷热源板式换热器、地源热泵与冷水机组的运行策略及生活热水应用进行了经验总结.%Taking the Shanghai Hongqiao Industrial Building air conditioning system as example, presents the liquid desiccant fresh air unit and ground-source heat pump design. Highlights the design points of the dry terminal device, cold and heat source unit, ground buried pipe system, air conditioning water system and automatic control system. According to the actual operation and commissioning, summarizes experiences of designing the cold and heat sources water system, dry fan-coil unit, high temperature ground-source heat pump, free cold and heat sources plate heat exchanger, water chiller and ground-source heat pump operation strategy and domestic hot water supply.

  19. A radiant heating test facility for space shuttle orbiter thermal protection system certification

    Science.gov (United States)

    Sherborne, W. D.; Milhoan, J. D.

    1980-01-01

    A large scale radiant heating test facility was constructed so that thermal certification tests can be performed on the new generation of thermal protection systems developed for the space shuttle orbiter. This facility simulates surface thermal gradients, onorbit cold-soak temperatures down to 200 K, entry heating temperatures to 1710 K in an oxidizing environment, and the dynamic entry pressure environment. The capabilities of the facility and the development of new test equipment are presented.

  20. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  1. Field testing of component-level model-based fault detection methods for mixing boxes and VAV fan systems

    Energy Technology Data Exchange (ETDEWEB)

    Xu, Peng; Haves, Philip

    2002-05-16

    An automated fault detection and diagnosis tool for HVAC systems is being developed, based on an integrated, life-cycle, approach to commissioning and performance monitoring. The tool uses component-level HVAC equipment models implemented in the SPARK equation-based simulation environment. The models are configured using design information and component manufacturers' data and then fine-tuned to match the actual performance of the equipment by using data measured during functional tests of the sort using in commissioning. This paper presents the results of field tests of mixing box and VAV fan system models in an experimental facility and a commercial office building. The models were found to be capable of representing the performance of correctly operating mixing box and VAV fan systems and detecting several types of incorrect operation.

  2. Data Acquisition System Architecture and Capabilities at NASA GRC Plum Brook Station's Space Environment Test Facilities

    Science.gov (United States)

    Evans, Richard K.; Hill, Gerald M.

    2014-01-01

    Very large space environment test facilities present unique engineering challenges in the design of facility data systems. Data systems of this scale must be versatile enough to meet the wide range of data acquisition and measurement requirements from a diverse set of customers and test programs, but also must minimize design changes to maintain reliability and serviceability. This paper presents an overview of the common architecture and capabilities of the facility data acquisition systems available at two of the world's largest space environment test facilities located at the NASA Glenn Research Center's Plum Brook Station in Sandusky, Ohio; namely, the Space Propulsion Research Facility (commonly known as the B-2 facility) and the Space Power Facility (SPF). The common architecture of the data systems is presented along with details on system scalability and efficient measurement systems analysis and verification. The architecture highlights a modular design, which utilizes fully-remotely managed components, enabling the data systems to be highly configurable and support multiple test locations with a wide-range of measurement types and very large system channel counts.

  3. Expert Meeting Report: HVAC Fault Detection, DIagnosis, and Repair/Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States)

    2016-05-01

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  4. Expert Meeting Report: HVAC Fault Detection, Diagnosis, and Repair/Replacement

    Energy Technology Data Exchange (ETDEWEB)

    Springer, David [Alliance for Residential Building Innovation (ARBI), Davis, CA (United States). Davis Energy Group

    2016-05-01

    The concept for the expert meeting described in this report was to bring together most of the stakeholders in the area of FDD, including academic researchers, manufacturers, educators, program managers and implementers, representatives of standards organizations, utilities, HVAC contractors, and home performance contractors to identify the major gaps and to develop ideas about what can be done to capitalize on the residential HVAC efficiency resource.

  5. Assessment of radiological protection systems among diagnostic radiology facilities in North East India.

    Science.gov (United States)

    Singh, Thokchom Dewan; Jayaraman, T; Arunkumar Sharma, B

    2017-03-01

    This study aims to assess the adequacy level of radiological protection systems available in the diagnostic radiology facilities located in three capital cities of North East (NE) India. It further attempts to understand, using a multi-disciplinary approach, how the safety codes/standards in diagnostic radiology framed by the Atomic Energy Regulatory Board (AERB) and the International Atomic Energy Agency (IAEA) to achieve adequate radiological protection in facilities, have been perceived, conceptualized, and applied accordingly in these facilities. About 30 diagnostic radiology facilities were randomly selected from three capitals of states in NE India; namely Imphal (Manipur), Shillong (Meghalaya) and Guwahati (Assam). A semi-structured questionnaire developed based on a multi-disciplinary approach was used for this study. It was observed that radiological practices undertaken in these facilities were not exactly in line with safety codes/standards in diagnostic radiology of the AERB and the IAEA. About 50% of the facilities had registered/licensed x-ray equipment with the AERB. More than 80% of the workers did not use radiation protective devices, although these devices were available in the facilities. About 85% of facilities had no institutional risk management system. About 70% of the facilities did not carry out periodic quality assurance testing of their x-ray equipment or surveys of radiation leakage around the x-ray room, and did not display radiation safety indicators in the x-ray rooms. Workers in these facilities exhibited low risk perception about the risks associated with these practices. The majority of diagnostic radiology facilities in NE India did not comply with the radiological safety codes/standards framed by the AERB and IAEA. The study found inadequate levels of radiological protection systems in the majority of facilities. This study suggests a need to establish firm measures that comply with the radiological safety codes/standards of the

  6. Non-Intrusive Load Monitoring of HVAC Components using Signal Unmixing

    Energy Technology Data Exchange (ETDEWEB)

    Rahimpour, Alireza [University of Tennessee, Knoxville (UTK); Qi, Hairong [ORNL; Fugate, David L [ORNL; Kuruganti, Teja [ORNL

    2015-01-01

    Heating, Ventilating and Air Conditioning units (HVAC) are a major electrical energy consumer in buildings. Monitoring of the operation and energy consumption of HVAC would increase the awareness of building owners and maintenance service providers of the condition and quality of performance of these units, enabling conditioned-based maintenance which would help achieving higher energy efficiency. In this paper, a novel non-intrusive load monitoring method based on group constrained non-negative matrix factorization is proposed for monitoring the different components of HVAC unit by only measuring the whole building aggregated power signal. At the first level of this hierarchical approach, power consumption of the building is decomposed to energy consumption of the HVAC unit and all the other electrical devices operating in the building such as lighting and plug loads. Then, the estimated power signal of the HVAC is used for estimating the power consumption profile of the HVAC major electrical loads such as compressors, condenser fans and indoor blower. Experiments conducted on real data collected from a building testbed maintained at the Oak Ridge National Laboratory (ORNL) demonstrate high accuracy on the disaggregation task.

  7. Non-Intrusive Load Monitoring of HVAC Components using Signal Unmixing

    Energy Technology Data Exchange (ETDEWEB)

    Rahimpour, Alireza [University of Tennessee, Knoxville (UTK); Qi, Hairong [ORNL; Fugate, David L [ORNL; Kuruganti, Teja [ORNL

    2015-01-01

    Heating, Ventilating and Air Conditioning units (HVAC) are a major electrical energy consumer in buildings. Monitoring of the operation and energy consumption of HVAC would increase the awareness of building owners and maintenance service providers of the condition and quality of performance of these units, enabling conditioned-based maintenance which would help achieving higher energy efficiency. In this paper, a novel non-intrusive load monitoring method based on group constrained non-negative matrix factorization is proposed for monitoring the different components of HVAC unit by only measuring the whole building aggregated power signal. At the first level of this hierarchical approach, power consumption of the building is decomposed to energy consumption of the HVAC unit and all the other electrical devices operating in the building such as lighting and plug loads. Then, the estimated power signal of the HVAC is used for estimating the power consumption profile of the HVAC major electrical loads such as compressors, condenser fans and indoor blower. Experiments conducted on real data collected from a building testbed maintained at the Oak Ridge National Laboratory (ORNL) demonstrate high accuracy on the disaggregation task.

  8. 招商银行上海大厦空调系统节能设计%Energy saving design of HVAC system for China Merchants Bank Tower in Shanghai

    Institute of Scientific and Technical Information of China (English)

    滕汜颖; 张伟程

    2014-01-01

    该大楼为超高层办公楼。介绍了空调冷热源和风、水系统中所采用的节能技术和措施,包括冰蓄冷、水蓄热、地源热泵、冷却塔供冷、冷却塔风机可调、大温差供回水、水系统分区、水系统变流量调节、变风量全空气空调、排风热回收、可变新风量。%This building is a super high-rise office building.Presents the adopted energy saving technique and measures including ice storage,water thermal storage,ground-source heat pump,free cooling by cooling tower,adjustable cooling tower fan,large temperature difference of supply and return water,different water system zones,variable flow rate adjustment of water system,variable air volume air conditioning,heat recovery of exhaust air and variable outdoor air.

  9. Airside HVAC BESTEST. Adaptation of ASHRAE RP 865 Airside HVAC Equipment Modeling Test Cases for ASHRAE Standard 140. Volume 1, Cases AE101-AE445

    Energy Technology Data Exchange (ETDEWEB)

    Neymark, J. [J. Neymark & Associates, Golden, CO (United States); Kennedy, M. [Mike D. Kennedy, Inc., Townsend, WA (United States); Judkoff, R. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Gall, J. [AAON, Inc., Tulsa, OK (United States); Knebel, D. [AAON, Inc., Tulsa, OK (United States); Henninger, R. [GARD Analytics, Inc., Arlington Heights, IL (United States); Witte, M. [GARD Analytics, Inc., Arlington Heights, IL (United States); Hong, T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); McDowell, T. [Thermal Energy System Specialists, Madison, WI (United States); Yan, D. [Tsinghua Univ., Beijing (China); Zhou, X. [Tsinghua Univ., Beijing (China)

    2016-03-01

    This report documents a set of diagnostic analytical verification cases for testing the ability of whole building simulation software to model the air distribution side of typical heating, ventilating and air conditioning (HVAC) equipment. These cases complement the unitary equipment cases included in American National Standards Institute (ANSI)/American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) Standard 140, Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs, which test the ability to model the heat-transfer fluid side of HVAC equipment.

  10. Hanazonobashi facilities control system. Centralized SCADA for metropolitan express-way; Shutokosokudoro koden Kanagawa kanribudono osame. Hanazonokyo shisetsu kanri system

    Energy Technology Data Exchange (ETDEWEB)

    Higashino, K.; Imai, K.; Kitaura, M.; Kayama, C.; Tsujita, H. [Nisshin Electric Co. Ltd., Kyoto (Japan)

    1996-03-29

    This paper introduces the centralized SCADA system in the express-way line of whole Kanagawa region, which can control various facilities, such as power receiving, distribution and switch facilities, pump houses, transformer towers, and lighting facilities for bridges. The system was designed so as to monitor the whole of the Wangan line to be extended in the future. It consists of a central facility control station (CS) and local control stations (LS). The CS can control the whole facilities and the LS have control functions of start/stop for individual facilities at the maintenance and inspection of the CS. The SCADA system is surpassing in the operability of a huge amount of information, information exchange with other control systems and disaster preventing systems, and the extendability and maintainability. It is a distributed computer control system and also a multi-window type highly functional man-machine system. Multiple projection type large displays were employed to use information in common among operators. To support the facility maintenance works effectively, a data base has been made for collective control of information including drawings, facilities registers, and manual books. 9 figs., 1 tab.

  11. Criticality safety evaluation report for the Cold Vacuum Drying Facility`s process water handling system

    Energy Technology Data Exchange (ETDEWEB)

    Roblyer, S.D.

    1998-02-12

    This report addresses the criticality concerns associated with process water handling in the Cold Vacuum Drying Facility (CVDF). The controls and limitations on equipment design and operations to control potential criticality occurrences are identified. The effectiveness of equipment design and operation controls in preventing criticality occurrences during normal and abnormal conditions is evaluated and documented in this report. Spent nuclear fuel (SNF) is removed from existing canisters in both the K East and K West Basins and loaded into a multicanister overpack (MCO) in the K Basin pool. The MCO is housed in a shipping cask surrounded by clean water in the annulus between the exterior of the MCO and the interior of the shipping cask. The fuel consists of spent N Reactor and some single pass reactor fuel. The MCO is transported to the CVDF near the K Basins to remove process water from the MCO interior and from the shipping cask annulus. After the bulk water is removed from the MCO, any remaining free liquid is removed by drawing a vacuum on the MCO`s interior. After cold vacuum drying is completed, the MCO is filled with an inert cover gas, the lid is replaced on the shipping cask, and the MCO is transported to the Canister Storage Building. The process water removed from the MCO contains fissionable materials from metallic uranium corrosion. The process water from the MCO is first collected in a geometrically safe process water conditioning receiver tank. The process water in the process water conditioning receiver tank is tested, then filtered, demineralized, and collected in the storage tank. The process water is finally removed from the storage tank and transported from the CVDF by truck.

  12. Cold Vacuum Drying facility deionized water system design description (SYS 25)

    Energy Technology Data Exchange (ETDEWEB)

    PITKOFF, C.C.

    1999-07-02

    This document describes the Cold Vacuum Drying Facility (CVDF) de-ionized water system. The de-ionized water system is used to provide clean, conditioned water, free from contaminants, chlorides and iron for the CVD Facility. Potable water is supplied to the deionized water system, isolated by a backflow prevention device. After the de-ionization process is complete, via a packaged de-ionization unit, de-ionized water is supplied to the process deionization unit.

  13. Control System and Operation of the Cryogenic Test Facilities for LHC Series Superconducting Magnets

    CERN Document Server

    Axensalva, J; Lamboy, J P; Tovar-Gonzalez, A; Vullierme, B

    2005-01-01

    Prior to their final preparation before installation in the tunnel, the ~1800 series superconducting magnets of the LHC machine will be entirely tested at reception on modular test facilities using dedicated control systems. The test facilities are operated by teams of high-skilled and trained operators. This paper describes the architecture of the control & supervision system of the cryogenic test facilities as well as the tools and management systems developed to help in real time all involved operation teams in order to reach the required industrial production level.

  14. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  15. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently

  16. Preliminary control system design and analysis for the Space Station Furnace Facility thermal control system

    Science.gov (United States)

    Jackson, M. E.

    1995-01-01

    This report presents the Space Station Furnace Facility (SSFF) thermal control system (TCS) preliminary control system design and analysis. The SSFF provides the necessary core systems to operate various materials processing furnaces. The TCS is defined as one of the core systems, and its function is to collect excess heat from furnaces and to provide precise cold temperature control of components and of certain furnace zones. Physical interconnection of parallel thermal control subsystems through a common pump implies the description of the TCS by coupled nonlinear differential equations in pressure and flow. This report formulates the system equations and develops the controllers that cause the interconnected subsystems to satisfy flow rate tracking requirements. Extensive digital simulation results are presented to show the flow rate tracking performance.

  17. Removal of viable bioaerosol particles with a low-efficiency HVAC filter enhanced by continuous emission of unipolar air ions

    Energy Technology Data Exchange (ETDEWEB)

    Huang, R.; Agranovski, I.; Pyankov, O. (Griffith Univ., Nathan, Qld (AU)); Grinshpun, S. (Univ. of Cincinnati, Dept. of Environmental Health, Cincinnati, OH (US))

    2008-04-15

    Continuous emission of unipolar ions has been shown to improve the performance of respirators and stationary filters challenged with non-biological particles. In this study, we investigated the ion-induced enhancement effect while challenging a low-efficiency heating, ventilation and air-conditioning (HVAC) filter with viable bacterial cells, bacterial and fungal spores, and viruses. The aerosol concentration was measured in real time. Samples were also collected with a bioaerosol sampler for viable microbial analysis. The removal efficiency of the filter was determined, respectively, with and without an ion emitter. The ionization was found to significantly enhance the filter efficiency in removing viable biological particles from the airflow. For example, when challenged with viable bacteria, the filter efficiency increased as much as four- to fivefold. For viable fungal spores, the ion-induced enhancement improved the efficiency by a factor of approx 2. When testing with virus-carrying liquid droplets, the original removal efficiency provided by the filter was rather low: 9.09 +- 4.84%. While the ion emission increased collection about fourfold, the efficiency did not reach 75-100% observed with bacteria and fungi. These findings, together with our previously published results for non-biological particles, demonstrate the feasibility of a new approach for reducing aerosol particles in HVAC systems used for indoor air quality control. (au)

  18. Assessing Impact of Large-Scale Distributed Residential HVAC Control Optimization on Electricity Grid Operation and Renewable Energy Integration

    Science.gov (United States)

    Corbin, Charles D.

    Demand management is an important component of the emerging Smart Grid, and a potential solution to the supply-demand imbalance occurring increasingly as intermittent renewable electricity is added to the generation mix. Model predictive control (MPC) has shown great promise for controlling HVAC demand in commercial buildings, making it an ideal solution to this problem. MPC is believed to hold similar promise for residential applications, yet very few examples exist in the literature despite a growing interest in residential demand management. This work explores the potential for residential buildings to shape electric demand at the distribution feeder level in order to reduce peak demand, reduce system ramping, and increase load factor using detailed sub-hourly simulations of thousands of buildings coupled to distribution power flow software. More generally, this work develops a methodology for the directed optimization of residential HVAC operation using a distributed but directed MPC scheme that can be applied to today's programmable thermostat technologies to address the increasing variability in electric supply and demand. Case studies incorporating varying levels of renewable energy generation demonstrate the approach and highlight important considerations for large-scale residential model predictive control.

  19. Operation of post-irradiation examination facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Eun Ka; Park, Kwang Joon; Jeon, Yong Bum [and others] [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-02-01

    In 1995, the post-irradiation examination (PIE) of nuclear fuels was performed as follows. The relation between burnup and top nozzle spring force of fuel assembly was obtained by measuring the holddown spring force on the Kori-1 reactor fuel assemblies. The resonance ultrasonic test for inspection of defect and moisture in fuel rod was carried out on fuel rods of C15 and J14 assemblies, and the change of fuel rod condition by storing in pool has been analyzed on the intentionally defected fuel rods (ID-C and ID-L) as well as intact fuel rod (1-2) by NDT in ht cell. The oxide layer thickness on cladding surface of J44-L12 fuel rod was measured by NDT method and metallography to reveal the oxidation as a function of temperature in the fuel rod, and the burnup of J44 fuel assembly was measured by chemical analysis. HVAC system and pool water treatment system of the PIE facility were continuously operated for air filtration and water purification. The monitoring of radiation and pool water in PIE facility has been carried out to maintain the facility safety, and electric power supply system was checked and maintained to supply the electric power to the facility normally. The developed measurement techniques of oxide layer thickness on fuel rod cladding and holddown spring force of top nozzle in fuel assembly were applied to examine the nuclear fuels. Besides, a radiation shielding glove box was designed and a hot cell compressor for volume reduction of radioactive materials was fabricated. 19 tabs., 38 figs., 7 refs. (Author) .new.

  20. Aerometric Information Retrieval System/AIRS Facility Subsystem (AIRS/AFS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Aerometric Information Retrieval System/AIRS Facility Subsystem (AIRS/AFS) is a database that provides information on air releases from various stationary...

  1. 76 FR 32085 - Medicare Program; Inpatient Psychiatric Facilities Prospective Payment System-Update for Rate...

    Science.gov (United States)

    2011-06-03

    ...This document corrects two technical errors that appeared in the final rule published in the Federal Register on May 6, 2011 entitled, ``Inpatient Psychiatric Facilities Prospective Payment System--Update for Rate Year Beginning July 1, 2011 (RY...

  2. Providing security for automated process control systems at hydropower engineering facilities

    Science.gov (United States)

    Vasiliev, Y. S.; Zegzhda, P. D.; Zegzhda, D. P.

    2016-12-01

    This article suggests the concept of a cyberphysical system to manage computer security of automated process control systems at hydropower engineering facilities. According to the authors, this system consists of a set of information processing tools and computer-controlled physical devices. Examples of cyber attacks on power engineering facilities are provided, and a strategy of improving cybersecurity of hydropower engineering systems is suggested. The architecture of the multilevel protection of the automated process control system (APCS) of power engineering facilities is given, including security systems, control systems, access control, encryption, secure virtual private network of subsystems for monitoring and analysis of security events. The distinctive aspect of the approach is consideration of interrelations and cyber threats, arising when SCADA is integrated with the unified enterprise information system.

  3. Aquifer thermal energy storage at Mid-Island postal facility: Phase 1 final report

    Energy Technology Data Exchange (ETDEWEB)

    Marseille, T.J.; Armstrong, P.R.; Brown, D.R.; Vail, L.W.; Kannberg, L.D.

    1993-05-01

    The successful widespread commercialization of aquifer thermal energy storage (ATES) in the United States will depend on how experiences gained from early full-scale projects are used as guides in the design, installation, and operation of future projects. One early system, built in the mid-1980s, is the US Postal Service (USPS) Mid-Island Mail Processing Facility (MPF), in Melville, New York. The heating, ventilation, and air conditioning (HVAC) of the MPF`s workroom is provided by an ATES system, which is operated year-round to provide a source for both heating and cooling, in combination with a triethylene glycol (TEG) liquid-desiccant system for humidity control. Because the facility affords a unique opportunity to study this innovative system, the US Department of Energy`s (DOE) Pacific Northwest Laboratory (PNL) entered into agreements with the USPS, the US Geological Survey (USGS), and the New York State Energy Research and Development Authority (the Energy Authority) to assess the operation and performance of the system. Two essentially independent questions were to be addressed by the project. The first question was: ``How does the MPF ATES/TEG technology compare to conventional technologies?`` The second was: ``What can be done to make operation of the USPS MPF more economical?`` Modelling of the MPF ATES/TEG HVAC system and its loads helped to address both of these questions by showing how much energy is used by the different system components. This report is divided into six sections. Section 1 is an introduction. Section 2 provides system background. Section 3 describes PNL`s technical performance assessment of the system. Section 4 discusses the life-cycle cost assessment. An operational assessment of the liquid-desiccant system is discussed in Section 5. Section 6 contains conclusions of this study.

  4. Aquifer thermal energy storage at Mid-Island postal facility: Phase 1 final report

    Energy Technology Data Exchange (ETDEWEB)

    Marseille, T.J.; Armstrong, P.R.; Brown, D.R.; Vail, L.W.; Kannberg, L.D.

    1993-05-01

    The successful widespread commercialization of aquifer thermal energy storage (ATES) in the United States will depend on how experiences gained from early full-scale projects are used as guides in the design, installation, and operation of future projects. One early system, built in the mid-1980s, is the US Postal Service (USPS) Mid-Island Mail Processing Facility (MPF), in Melville, New York. The heating, ventilation, and air conditioning (HVAC) of the MPF's workroom is provided by an ATES system, which is operated year-round to provide a source for both heating and cooling, in combination with a triethylene glycol (TEG) liquid-desiccant system for humidity control. Because the facility affords a unique opportunity to study this innovative system, the US Department of Energy's (DOE) Pacific Northwest Laboratory (PNL) entered into agreements with the USPS, the US Geological Survey (USGS), and the New York State Energy Research and Development Authority (the Energy Authority) to assess the operation and performance of the system. Two essentially independent questions were to be addressed by the project. The first question was: How does the MPF ATES/TEG technology compare to conventional technologies '' The second was: What can be done to make operation of the USPS MPF more economical '' Modelling of the MPF ATES/TEG HVAC system and its loads helped to address both of these questions by showing how much energy is used by the different system components. This report is divided into six sections. Section 1 is an introduction. Section 2 provides system background. Section 3 describes PNL's technical performance assessment of the system. Section 4 discusses the life-cycle cost assessment. An operational assessment of the liquid-desiccant system is discussed in Section 5. Section 6 contains conclusions of this study.

  5. Implementation of remove monitoring in facilities under safeguards with unattended systems

    Energy Technology Data Exchange (ETDEWEB)

    Beddingfield, David H [Los Alamos National Laboratory; Nordquist, Heather A [Los Alamos National Laboratory; Umebayaashi, Eiji [JAEA

    2009-01-01

    Remote monitoring is being applied by the International Atomic Energy Agency (IAEA) at nuclear facilities around the world. At the Monju Reactor in Japan we have designed, developed and implemented a remote monitoring approach that can serve as a model for applying remote monitoring to facilities that are already under full-scope safeguards using unattended instrumentation. Remote monitoring implementations have historically relied upon the use of specialized data collection hardware and system design features that integrate remote monitoring into the safeguards data collection system. The integration of remote monitoring and unattended data collection increases the complexity of safeguards data collection systems. This increase in complexity necessarily produces a corresponding reduction of system reliability compared to less-complex unattended monitoring systems. At the Monju facility we have implemented a remote monitoring system that is decoupled from the activity of safeguards data collection. In the completed system the function of remote data transfer is separated from the function of safeguards data collection. As such, a failure of the remote monitoring function cannot produce an associated loss of safeguards data, as is possible with integrated remote-monitoring implementations. Currently, all safeguards data from this facility is available to the IAEA on a 24/7 basis. This facility employs five radiation-based unattended systems, video surveillance and numerous optical seal systems. The implementation of remote monitoring at this facility, while increasing the complexity of the safeguards system, is designed to avoid any corresponding reduction in reliability of the safeguards data collection systems by having decoupled these functions. This design and implementation can serve as a model for implementation of remote monitoring at nuclear facilities that currently employ unattended safeguards systems.

  6. Facility layout planning for educational systems: An application of fuzzy GIS and AHP

    Directory of Open Access Journals (Sweden)

    Hossein Ebrhaimzadeh Asmin

    2014-06-01

    Full Text Available One of the most important issues in urban planning programs is to allocate necessary spaces for educational applications. Selecting appropriate locations for training centers increases students' mental capabilities. Suitable location for the establishment of educational facilities is the first fundamental step for development of educational systems. The selection of optimal sites for educational facilities involves numerous parameters and it is essential to use multiple criteria decision making approaches to make wise decisions. This paper presents an empirical investigation on facility layout planning for educational systems in city of Birjand, Iran. Using fuzzy GIS as well as analytical hierarchy process (AHP, the study determines the most appropriate candidates for training centers.

  7. Performance Characterization of the Production Facility Prototype Helium Flow System

    Energy Technology Data Exchange (ETDEWEB)

    Woloshun, Keith Albert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dale, Gregory E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dalmas, Dale Allen [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Romero, Frank Patrick [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-12-16

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was need for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. Blower performance (mass flow rate as a function of loop pressure drop) was measured at 4 blower speeds. Results are reported below.

  8. Facility design philosophy: Tank Waste Remediation System Process support and infrastructure definition

    Energy Technology Data Exchange (ETDEWEB)

    Leach, C.E.; Galbraith, J.D. [Westinghouse Hanford Co., Richland, WA (United States); Grant, P.R.; Francuz, D.J.; Schroeder, P.J. [Fluor Daniel, Inc., Richland, WA (United States)

    1995-11-01

    This report documents the current facility design philosophy for the Tank Waste Remediation System (TWRS) process support and infrastructure definition. The Tank Waste Remediation System Facility Configuration Study (FCS) initially documented the identification and definition of support functions and infrastructure essential to the TWRS processing mission. Since the issuance of the FCS, the Westinghouse Hanford Company (WHC) has proceeded to develop information and requirements essential for the technical definition of the TWRS treatment processing programs.

  9. Development of a mobile, stand-alone test facility for solar thermal collectors and systems

    Energy Technology Data Exchange (ETDEWEB)

    Bestenlehner, Dominik; Drueck, Harald; Fischer, Stephan; Mueller-Steinhagen, Hans [Solar- und Waermetechnik Stuttgart (SWT), Stuttgart (Germany)

    2008-07-01

    Testing of solar thermal systems and components requires different standards and thus different test facilities. Usually each facility is individually designed and constructed for tests according to a specific test method. For performing tests of solar thermal systems and collectors according to the most popular standards, test laboratories or manufacturers have to invest a huge amount of staff time, resources and capital to set up the required test facilities. A way to overcome this problem is the mobile, stand-alone solar thermal collector and system test facility developed by SWT-Technologie from Stuttgart, Germany, in cooperation with the Institute of Thermodynamics and Thermal Engineering of the University of Stuttgart. The complete test facility is installed inside a conventional 12 foot office container. This mobile container based test facility is delivered to the site of the customer as a turn-key product that can be put into operation within one single day. Even more, the mobile container based test facility is a three-in-one test facility, since it is possible to perform tests according to three different standards and test methods. The performance of solar collectors can be tested according to the European standard EN 12975 or the international standard ISO 9806, respectively. The performance of solar thermal systems can be determined according to the international standards ISO 9459-2 (CSTG-method) and ISO 9495-5 (DST-method). This paper describes the mobile, container based solar collector and system test facility in detail and reports the experience gained so far. (orig.)

  10. Demonstration of Standard HVAC Single-Loop Digital Control Systems

    Science.gov (United States)

    1993-01-01

    annubars placed in the ducts. 23 II I __ _j’q_._ II I:I I24 0 (D o 0 0 0 a( ) aU 0- V) C4 CA o V ok 0 C-4 t C-, C-) I.. 25 00 0 Wo- Ln0Q C) 00 00 V) 0...lines were identified and marked, and the wiring schemes were analyzed. Because of budget restrictions, the annubars were not replaced with air flow...retum-fan-inlet-guide vanes to maintain a volumetric air flow that is 1000 cfm less than the supply air flow. The return-air annubar sensor/transmitter

  11. Rightsizing HVAC Systems to Reduce Capital Costs and Save Energy

    Science.gov (United States)

    Sebesta, James

    2010-01-01

    Nearly every institution is faced with the situation of having to reduce the cost of a construction project from time to time through a process generally referred to as "value engineering." Just the mention of those words, however, gives rise to all types of connotations, thoughts, and memories (usually negative) for those in the facilities…

  12. Design And Prototype Testing Of Economizer In HVAC Systems

    OpenAIRE

    Kongara Ajay; Sudhakar, G.

    2014-01-01

    Power, the word itself says to what extent the world is dependent on it. It may be fortunate or unfortunate, we are totally dependent on the power which is making the usage higher and higher which left us with energy crises and increasing costs of the energy usage. It’s time for Energy saving. These days, number of people in favour of the Energy saving has been increasing not to lessen the cost of usage but to let our future generations live with light and luxury. In this p...

  13. Cold Vacuum Drying Facility Crane and Hoist System Design Description (SYS 14)

    Energy Technology Data Exchange (ETDEWEB)

    TRAN, Y.S.

    2000-06-07

    This system design description (SDD) is for the Cold Vacuum Drying (CVD) Facility overhead crane and hoist system. The overhead crane and hoist system is a general service system. It is located in the process bays of the CVD Facility, supports the processes required to drain the water and dry the spent nuclear fuel (SNF) contained in the multi-canister overpacks (MCOs) after they have been removed from the K-Basins. The location of the system in the process bay is shown.

  14. Power systems development facility. Quarterly technical progress report, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  15. Electrostatic MEMS vibration energy harvester for HVAC applications with impact-based frequency up-conversion

    Science.gov (United States)

    Oxaal, J.; Hella, M.; Borca-Tasciuc, D.-A.

    2016-12-01

    This paper reports on electrostatic MEMS vibration energy harvesters with gap-closing interdigitated electrodes, designed for and tested on HVAC air ducts. The harvesters were fabricated on SOI wafers with 200 µm device layer using a custom microfabrication process. Designs with aspects ratio (electrodes’ gap versus depth) of 10 and 20 were implemented, while the overall footprint was approximately 1 cm  ×  1 cm in both cases. In order to enhance the power output, a dual-level physical stopper system was designed to control the minimum gap between the electrodes, which is a key parameter in the conversion process. The dual-level stopper utilizes cantilever beams to absorb a portion of the impact energy as the electrodes approach the impact point, and a film of parylene with nanometer thickness deposited on the electrode sidewalls. The parylene layer defines the absolute minimum gap and provides electrical insulation. The fabricated devices were first tested on a vibration shaker to characterize the resonant behavior. Devices with aspect ratio 10 were found to exhibit frequency up-conversion, which enhances the amount of converted power. Devices with both aspect ratios were found to exhibits spring hardening due to impact with the stoppers and spring softening behavior at increasing voltage bias. The highest power measured on shaker table for sinusoidal vibrations was 3.13 µW (includes enhancement due to frequency up-conversion driven by impact) for aspect ratio 10, and 0.166 µW for aspect ratio 20. The corresponding dimensional figure-of-merit, defined as the power output normalized to vibration acceleration and frequency, squared voltage and device mass, was in the range of 10 · 10-8 m V-2 for both devices, about an order of magnitude higher than state-of-the-art. Testing was carried out on HVAC air duct vibrating with an RMS acceleration of 155 mg RMS, a primary frequency of 60 Hz and a PSD of 7.15 · 10-2 g2 Hz-1. The peak power measured was

  16. Naval Facility Energy Conversion Plants as Resource Recovery System Components.

    Science.gov (United States)

    1980-01-01

    were performed on SRI’s CDC 6400 computer. The software packages used were (1) The KRONOS operating system designed for the SRI CDC 6400 and its...computational sequence, indicates the software used at each step. KRONOS Operating System The KRONOS Time-Sharing System was developed by Control Data...Corporation (CDC) to provide remote interactive job processing for various computers, including the CDC 6400. The KRONOS system was used in this

  17. The installation and performance test of the surveillance system for DUPIC facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dong Young; Kim, Ho Dong; Cha, Hong Ryul

    2000-07-01

    We have developed the real time surveillance system, named by DSSS, for DUPIC test facility. The system acquires data from He-3 neutron monitors(DSNM) and CCD cameras to automatically diagnose the transportation status of nuclear material. This technical report shortly illustrates important features of hardware and software of the system.

  18. Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

  19. An optimization-based approach for facility energy management with uncertainties, and, Power portfolio optimization in deregulated electricity markets with risk management

    Science.gov (United States)

    Xu, Jun

    Topic 1. An Optimization-Based Approach for Facility Energy Management with Uncertainties. Effective energy management for facilities is becoming increasingly important in view of the rising energy costs, the government mandate on the reduction of energy consumption, and the human comfort requirements. This part of dissertation presents a daily energy management formulation and the corresponding solution methodology for HVAC systems. The problem is to minimize the energy and demand costs through the control of HVAC units while satisfying human comfort, system dynamics, load limit constraints, and other requirements. The problem is difficult in view of the fact that the system is nonlinear, time-varying, building-dependent, and uncertain; and that the direct control of a large number of HVAC components is difficult. In this work, HVAC setpoints are the control variables developed on top of a Direct Digital Control (DDC) system. A method that combines Lagrangian relaxation, neural networks, stochastic dynamic programming, and heuristics is developed to predict the system dynamics and uncontrollable load, and to optimize the setpoints. Numerical testing and prototype implementation results show that our method can effectively reduce total costs, manage uncertainties, and shed the load, is computationally efficient. Furthermore, it is significantly better than existing methods. Topic 2. Power Portfolio Optimization in Deregulated Electricity Markets with Risk Management. In a deregulated electric power system, multiple markets of different time scales exist with various power supply instruments. A load serving entity (LSE) has multiple choices from these instruments to meet its load obligations. In view of the large amount of power involved, the complex market structure, risks in such volatile markets, stringent constraints to be satisfied, and the long time horizon, a power portfolio optimization problem is of critical importance but difficulty for an LSE to serve the

  20. [Marketing in the system of military-medical facilities].

    Science.gov (United States)

    Kostiuchenko, O M; Sviridova, T B

    2014-02-01

    Military medical facilities of the Ministry of Defence of the Russian, have received the right to provide additional services and have been involved in the sphere of market relations. The strong influence of market relations - an objective reality that must be used for the development of military medical institutions and improving quality of care.Effective commercial activity can improve capabilities of the military medical institutions. This requires constant study of market mechanisms to implement and develop their competitive advantage. The paper substantiates the need for the participation of military medical institutions in the provision of health services to the public on the terms of compensation incurred by financial institutions costs (paid medical services, medical assistance program of compulsory and voluntary health insurance). Taking into account the specifics of military medical institutions set out basic principles and recommendations have been implementing marketing approach in their management, the practical application of which will not only increase efficiency, but also create conditions to improve the financial and economic indicators. This knowledge will help the mechanism of functioning health care market and the rules of interaction of market counterparties.

  1. Implementation of alarm system for vibration monitoring of KOMAC facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae-Ha; Ahn, Tae-Sung; Song, Young-Gi; Kwon, Hyeok-Jung; Cho, Yong-Sub [KOMAC, Gyeongju (Korea, Republic of)

    2015-05-15

    For operating 100 MeV linac, Devices have to be operated in certain order. Thus malfunction of a device cause damage to linac and related devices. To protect linac, machine protect system (MPS) has been developed. The MPS protects the components by monitoring hardwired signals. When values of operating parameters go beyond or below limit, alarm will be generated and interlock system which stops related devices in certain sequence will run. Other factor, giving damage to linac is disaster. A strong vibration such as earthquake causes malfunction of devices and damage to linac. Against disaster, the monitoring system based on Experimental Physics and Industrial Control System (EPICS) was implemented. Configuration and Implementation of the monitoring system are presented and some preliminary results are reported. KOMAC implemented alarm system for a strong vibration and fire. Alarm is generated in unusual situation. Coping rapidly with situation, damages for Linac and related devices can be reduced.

  2. Earth Systems Questions in Experimental Climate Change Science: Pressing Questions and Necessary Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Osmond, B.

    2002-05-20

    Sixty-four scientists from universities, national laboratories, and other research institutions worldwide met to evaluate the feasibility and potential of the Biosphere2 Laboratory (B2L) as an inclusive multi-user scientific facility (i.e., a facility open to researchers from all institutions, according to agreed principles of access) for earth system studies and engineering research, education, and training relevant to the mission of the United States Department of Energy (DOE).

  3. Flathead Electric Cooperative Facility Geothermal Heat Pump System Upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xiaobing [Oak Ridge National Lab

    2014-06-01

    High initial cost and lack of public awareness of ground source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This paper highlights findings of a case study of one of the ARRA-funded GSHP demonstration projects, which is a heating only central GSHP system using shallow aquifer as heat source and installed at a warehouse and truck bay at Kalispell, MT. This case study is based on the analysis of measured performance data, utility bills, and calculations of energy consumptions of conventional central heating systems for providing the same heat outputs as the central GSHP system did. The evaluated performance metrics include energy efficiency of the heat pump equipment and the overall GSHP system, pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of GSHP system compared with conventional heating systems. This case study also identified areas for reducing uncertainties in performance evaluation, improving operational efficiency, and reducing installed cost of similar GSHP systems in the future. Publication of ASHRAE at the annual conference in Seattle June 2014.

  4. Flathead Electric Cooperative Facility Geothermal Heat Pump System Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xiaobing [Oak Ridge National Lab

    2014-06-01

    High initial cost and lack of public awareness of ground source heat pump (GSHP) technology are the two major barriers preventing rapid deployment of this energy saving technology in the United States. Under the American Recovery and Reinvestment Act (ARRA), 26 GSHP projects have been competitively selected and carried out to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. This paper highlights findings of a case study of one of the ARRA-funded GSHP demonstration projects, which is a heating only central GSHP system using shallow aquifer as heat source and installed at a warehouse and truck bay at Kalispell, MT. This case study is based on the analysis of measured performance data, utility bills, and calculations of energy consumptions of conventional central heating systems for providing the same heat outputs as the central GSHP system did. The evaluated performance metrics include energy efficiency of the heat pump equipment and the overall GSHP system, pumping performance, energy savings, carbon emission reductions, and cost-effectiveness of GSHP system compared with conventional heating systems. This case study also identified areas for reducing uncertainties in performance evaluation, improving operational efficiency, and reducing installed cost of similar GSHP systems in the future. Publication of ASHRAE at the annual conference in Seattle.

  5. Mirror fusion test facility magnet system. Final design report

    Energy Technology Data Exchange (ETDEWEB)

    Henning, C.D.; Hodges, A.J.; VanSant, J.H.; Dalder, E.N.; Hinkle, R.E.; Horvath, J.A.; Scanlan, R.M.; Shimer, D.W.; Baldi, R.W.; Tatro, R.E.

    1980-09-03

    Information is given on each of the following topics: (1) magnet description, (2) superconducting manufacture, (3) mechanical behavior of conductor winding, (4) coil winding, (5) thermal analysis, (6) cryogenic system, (7) power supply system, (8) structural analysis, (9) structural finite element analysis refinement, (10) structural case fault analysis, and (11) structural metallurgy. (MOW)

  6. The National Ignition Facility (NIF) wavefront control system

    Energy Technology Data Exchange (ETDEWEB)

    Van Atta, L; Bliss, E; Bruns, D; Feldman, M; Grey, A; Henesian, M; J; Koch, J; LaFiandra, C; Lawson; Sacks, R; Salmon, T; Toeppen, J; Winters, S; Woods, B; Zacharias, R

    1998-08-17

    A wavefront control system will be employed on NIF to correct beam aberrations that otherwise would limit the minimum target focal spot size. For most applications, NIF requires a focal spot that is a few times the diffraction limit. Sources of aberrations that must be corrected include prompt pump-induced distortions in the laser slabs, thermal distortions in the laser slabs from previous shots, manufacturing figure errors in the optics, beam off-axis effects, gas density variations, and gravity, mounting, and coating- induced optic distortions. The NIF Wavefront Control System consists of five subsystems: 1) a deformable mirror, 2) a wavefront sensor, 3) a computer controller, 4) a wavefront reference system, and 5) a system of fast actuators to allow the wavefront control system to operate to within one second of the laser shot. The system includes the capability for in situ calibrations and operates in closed loop prior to the shot. Shot wavefront data is recorded. This paper describes the function, realization, and performance of each wavefront control subsystem. Subsystem performance will be characterized by computer models and by test results. The focal spot improvement in the NIF laser system effected by the wavefront control system will be characterized through computer models.

  7. DITCM roadside facilities for cooperative systems testing and evaluation

    NARCIS (Netherlands)

    Passchier, I.; Netten, B.D.; Wedemeijer, H.; Maas, S.M.P.; Leeuwen, C.J. van; Schackmann, P.P.M.

    2013-01-01

    Cooperative systems are being developed for large scale deployment in the near future. Validation of the performance of cooperative systems, and evaluation of the impact of cooperative applications is crucial before large scale deployment can proceed. The DITCM test site facilitates testing, evaluat

  8. Validation of the criteria for initiating the cleaning of heating, ventilation, and air-conditioning (HVAC) ductwork under real conditions.

    Science.gov (United States)

    Lavoie, Jacques; Marchand, Geneviève; Cloutier, Yves; Lavoué, Jérôme

    2011-08-01

    Dust accumulation in the components of heating, ventilation, and air-conditioning (HVAC) systems is a potential source of contaminants. To date, very little information is available on recognized methods for assessing dust buildup in these systems. The few existing methods are either objective in nature, involving numerical values, or subjective in nature, based on experts' judgments. An earlier project aimed at assessing different methods of sampling dust in ducts was carried out in the laboratories of the Institut de recherche Robert-Sauvé en santé et en sécurité du travail (IRSST). This laboratory study showed that all the sampling methods were practicable, provided that a specific surface-dust cleaning initiation criterion was used for each method. However, these conclusions were reached on the basis of ideal conditions in a laboratory using a reference dust. The objective of this present study was to validate these laboratory results in the field. To this end, the laboratory sampling templates were replicated in real ducts and the three sampling methods (the IRSST method, the method of the U.S. organization National Air Duct Cleaner Association [NADCA] and that of the French organization Association pour la Prévention et l'Étude de la Contamination [ASPEC]) were used simultaneously in a statistically representative number of systems. The air return and supply ducts were also compared. Cleaning initiation criteria under real conditions were found to be 6.0 mg/100 cm(2) using the IRSST method, 2.0 mg/100 cm(2) using the NADCA method, and 23 mg/100 cm(2) using the ASPEC method. In the laboratory study, the criteria using the same methods were 6.0 for the IRSST method, 2.0 for the NADCA method, and 3.0 for the ASPEC method. The laboratory criteria for the IRSST and NADCA methods were therefore validated in the field. The ASPEC criterion was the only one to change. The ASPEC method therefore allows for the most accurate evaluation of dust accumulation in HVAC

  9. Checkout and start-up of the integrated DWPF (Defense Waste Processing Facility) melter system

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.E.; Hutson, N.D.; Miller, D.H.; Morrison, J.; Shah, H.; Shuford, J.A.; Glascock, J.; Wurzinger, F.H.; Zamecnik, J.R.

    1989-11-11

    The Integrated DWPF Melter System (IDMS) is a one-ninth-scale demonstration of the Defense Waste Processing Facility (DWPF) feed preparation, melter, and off-gas systems. The IDMS will be the first engineering-scale melter system at SRL to process mercury and flowsheet levels of halides and sulfates. This report includes a summary of the IDMS program objectives, system and equipment descriptions, and detailed discussions of the system checkout and start-up. 10 refs., 44 figs., 20 tabs.

  10. XPLanner: A knowledge-based decision support system for facility management and planning

    OpenAIRE

    S-Y Han; Kim, T. J.; I Adiguzel

    1991-01-01

    A case study is reported of the design, implementation, and evaluation of a knowledge-based decision support system, XPLanner. XPLanner integrates an expert system with optimization modeling technique, database management system, and interactive user interface to create a comprehensive decision aid for facility management and planning by the US Army. It is believed that integrating the expert system with the modeling and data management capabilities of decision support systems can create a co...

  11. The Core Services of the Facilities Management Based Company in Malaysia

    Directory of Open Access Journals (Sweden)

    Ahmad Zawawi Zuraihana

    2014-01-01

    Full Text Available Many questions rose on defining the implementation of Facilities Management (FM in Malaysia. To date, the FM player only provided services sufficiently without the desires to enhance their services by taking into account the standard of practice which should form the basis. The extent of the services in Facilities Management based companies in Malaysia is not known and this paper aimed to identify within the context. The scope of study is limited to respondents in Klang Valley area. Literature review is used as a basis and questionnaires survey distributed to 20 companies, representing 56% of the total FM companies in Klang Valley are used to capture the data. The senior management level is assessed to represent. The results revealed that the implementation of facilities management services is limited, but still evolving. The majority of the FM based companies provides facilities services under the category of building operation and maintenance as their core business and procured them by in-house. The core services comprise of Electrical System, Cleaning, mechanical, HVAC system, plumbing & Sewerage , Fire Protection, Landscape, Lifts and Escalator, Security & Safety, Parking Management, Consultancy & Advisory Services, Waste Management, ICT System, Pest Control, Energy Management & Conservation, Building Audit Services, Customer Care Management, Transition Management, Catering &Vending Services. Based on what FM can offer, there is the necessity to reinforce the awareness to ensure continuously improve the management of national assets and facilities.

  12. Operating experience review - Ventilation systems at Department of Energy Facilities

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Office of Special Projects (DP-35), formerly Office of Self-Assessment (DP-9), analyzed occurrences caused by problems with equipment and material and recommended the following systems for an in-depth study: (1) Selective Alpha Air Monitor (SAAM), (2) Emergency Diesel Generator, (3) Ventilation System, (4) Fire Alarm System. Further, DP-35 conducted an in-depth review of the problems associated with SAAM and with diesel generators, and made several recommendations. This study focusses on ventilation system. The intent was to determine the causes for the events related to these system that were reported in the Occurrence Reporting and Processing System (ORPS), to identify components that failed, and to provide technical information from the commercial and nuclear industries on the design, operation, maintenance, and surveillance related to the system and its components. From these data, sites can develop a comprehensive program of maintenance management, including surveillance, to avoid similar occurrences, and to be in compliance with the following DOE orders.

  13. YALINA facility a sub-critical Accelerator- Driven System (ADS) for nuclear energy research facility description and an overview of the research program (1997-2008).

    Energy Technology Data Exchange (ETDEWEB)

    Gohar, Y.; Smith, D. L.; Nuclear Engineering Division

    2010-04-28

    The YALINA facility is a zero-power, sub-critical assembly driven by a conventional neutron generator. It was conceived, constructed, and put into operation at the Radiation Physics and Chemistry Problems Institute of the National Academy of Sciences of Belarus located in Minsk-Sosny, Belarus. This facility was conceived for the purpose of investigating the static and dynamic neutronics properties of accelerator driven sub-critical systems, and to serve as a neutron source for investigating the properties of nuclear reactions, in particular transmutation reactions involving minor-actinide nuclei. This report provides a detailed description of this facility and documents the progress of research carried out there during a period of approximately a decade since the facility was conceived and built until the end of 2008. During its history of development and operation to date (1997-2008), the YALINA facility has hosted several foreign groups that worked with the resident staff as collaborators. The participation of Argonne National Laboratory in the YALINA research programs commenced in 2005. For obvious reasons, special emphasis is placed in this report on the work at YALINA facility that has involved Argonne's participation. Attention is given here to the experimental program at YALINA facility as well as to analytical investigations aimed at validating codes and computational procedures and at providing a better understanding of the physics and operational behavior of the YALINA facility in particular, and ADS systems in general, during the period 1997-2008.

  14. Investigation of development and management of treatment planning systems for BNCT at foreign facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A new computational dosimetry system for BNCT: JCDS is developed by JAERI in order to carry out BNCT with epithermal neutron beam at present. The development and management situation of computational dosimetry system, which are developed and are used in BNCT facilities in foreign countries, were investigated in order to accurately grasp functions necessary for preparation of the treatment planning and its future subjects. In present state, 'SERA', which are developed by Idaho National Engineering and Environmental Laboratory (INEEL), is used in many BNCT facilities. Followings are necessary for development and management of the treatment planning system. (1) Reliability confirmation of system performance by verification as comparison examination of calculated value with actual experimental measured value. (2) Confirmation systems such as periodic maintenance for retention of the system quality. (3) The improvement system, which always considered relative merits and demerits with other computational dosimetry system. (4) The development of integrated system with patient setting. (author)

  15. Spent nuclear fuel project cold vacuum drying facility process water conditioning system design description

    Energy Technology Data Exchange (ETDEWEB)

    IRWIN, J.J.

    1998-11-30

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Process Water Conditioning (PWC) System. The SDD was developed in conjunction with HNF-SD-SNF-SAR-002, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), the HNF-SD-SNF-DRD-O02, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the PWC equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  16. Cold Vacuum Dryer (CVD) Facility Fire Protection System Design Description (SYS 24)

    Energy Technology Data Exchange (ETDEWEB)

    SINGH, G.

    2000-10-17

    This system design description (SDD) addresses the Cold Vacuum Drying (CVD) Facility fire protection system (FPS). The primary features of the FPS for the CVD are a fire alarm and detection system, automatic sprinklers, and fire hydrants. The FPS also includes fire extinguishers located throughout the facility and fire hydrants to assist in manual firefighting efforts. In addition, a fire barrier separates the operations support (administrative) area from the process bays and process bay support areas. Administrative controls to limit combustible materials have been established and are a part of the overall fire protection program. The FPS is augmented by assistance from the Hanford Fire Department (HED) and by interface systems including service water, electrical power, drains, instrumentation and controls. This SDD, when used in conjunction with the other elements of the definitive design package, provides a complete picture of the FPS for the CVD Facility.

  17. Effluent Containment System for space thermal nuclear propulsion ground test facilities

    Science.gov (United States)

    1995-08-01

    This report presents the research and development study work performed for the Space Reactor Power System Division of the U.S. Department of Energy on an innovative effluent containment system (ECS) that would be used during ground testing of a space nuclear thermal rocket engine. A significant portion of the ground test facilities for a space nuclear thermal propulsion engine are the effluent treatment and containment systems. The proposed ECS configuration developed recycles all engine coolant media and does not impact the environment by venting radioactive material. All coolant media, hydrogen and water, are collected, treated for removal of radioactive particulates, and recycled for use in subsequent tests until the end of the facility life. Radioactive materials removed by the treatment systems are recovered, stored for decay of short-lived isotopes, or packaged for disposal as waste. At the end of the useful life, the facility will be decontaminated and dismantled for disposal.

  18. Host-based data acquisition system to control pulsed facilities of the accelerator

    Science.gov (United States)

    Zamriy, V. N.

    2016-09-01

    The report discusses development of the host-based system to carry out timed measurements and data acquisition for the control of pulsed facilities of the accelerator. We consider modes of timing and allocation of operations of channels and the system node. The time of any working cycle of the pulsed facilities, rate of a data flow and an amount of serviced channels are coordinated with operation characteristics of the system node. Estimations of the readout rate of the data and the waiting time demonstrate the system efficiency. The technique has been developed to provide checking of groups of pulse parameters and control the facilities of the linear accelerator of electrons LUE-200 of the neutron source IREN.

  19. Spent nuclear fuel project cold vacuum drying facility vacuum and purge system design description

    Energy Technology Data Exchange (ETDEWEB)

    IRWIN, J.J.

    1998-11-30

    This document provides the System Design Description (SDD) for the Cold Vacuum Drying Facility (CVDF) Vacuum and Purge System (VPS) . The SDD was developed in conjunction with HNF-SD-SNF-SAR-O02, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998), The HNF-SD-SNF-DRD-002, 1998, Cold Vacuum Drying Facility Design Requirements, and the CVDF Design Summary Report. The SDD contains general descriptions of the VPS equipment, the system functions, requirements and interfaces. The SDD provides references for design and fabrication details, operation sequences and maintenance. This SDD has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  20. A real-time simulation facility for advanced digital guidance and control system research

    Science.gov (United States)

    Bryant, W. H.; Downing, D. R.; Ostroff, A. J.

    1979-01-01

    A real-time simulation facility built at NASA's Langley Research Center to support digital guidance and control research and development activities is examined. The unit has recently been used to develop autoland systems for VTOL. The paper describes the autoland experiment and the flight environment, the simulation facility hardware and software, and presents typical simulation data to illustrate the type of data analysis carried out during software development. Finally, flight data for a later version of the autoland system are presented to demonstrate the simulation's capability to predict overall system behavior.