  1. Interim Storage Facility decommissioning. Final report

    International Nuclear Information System (INIS)

    Johnson, R.P.; Speed, D.L.

    1985-01-01

    Decontamination and decommissioning of the Interim Storage Facility were completed. Activities included performing a detailed radiation survey of the facility, removing surface and imbedded contamination, excavating and removing the fuel storage cells, restoring the site to natural conditions, and shipping waste to Hanford, Washington, for burial. The project was accomplished on schedule and 30% under budget with no measurable exposure to decommissioning personnel

  2. Financial compensation for municipalities hosting interim or final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Barboza, Alex; Vicente, Roberto

    2005-01-01

    Brazilian Law No. 10308 issued November 20, 2001, establishes in its 34th article that 'those municipalities hosting interim or final disposal facilities for radioactive waste are eligible to receive a monthly payment as compensation'. The values of due payments depend on parameters such as volume of wastes and activity and half-lives of the radionuclides. The method to calculating those values was established by the National Commission on Nuclear Energy, the Brazilian regulatory authority, by Resolution No. 10, issued in the August 18, 2003. In this paper we report the application of that method to a low- and intermediate-level radioactive waste interim storage facility at the Nuclear Energy Research Institute. (author)

  3. Interim and final storage casks

    International Nuclear Information System (INIS)

    Stumpfrock, L.; Kockelmann, H.

    2012-01-01

    The disposal of radioactive waste is a huge social challenge in Germany and all over the world. As is well known the search for a site for a final repository for high-level waste in Germany is not complete. Therefore, interim storage facilities for radioactive waste were built at plant sites in Germany. The waste is stored in these storage facilities in appropriate storage and transport casks until the transport in a final repository can be carried out. Licensing of the storage and transport casks aimed for use in the public space is done according to the traffic laws and for handling in the storage facility according to nuclear law. Taking into account the activity of the waste to be stored, different containers are in use, so that experience is available from the licensing and operation in interim storage facilities. The large volume of radioactive waste to be disposed of after the shut-down of power generation in nuclear power stations makes it necessary for large quantities of licensed storage and transport casks to be provided soon.

  4. Dry storage of spent fuel elements: interim facility

    International Nuclear Information System (INIS)

    Quihillalt, O.J.

    1993-01-01

    Apart from the existing facilities to storage nuclear fuel elements at Argentina's nuclear power stations, a new interim storage facility has been planned and projected by the Argentinean Atomic Energy Commission (CNEA) that will be constructed by private group. This article presents the developments and describes the activities undertaken until the national policy approach to the final decision for the most suitable alternative to be adopted. (B.C.A.). 09 refs, 01 fig, 09 tabs

  5. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs

  6. Site safety progress review of spent fuel central interim storage facility. Final report

    International Nuclear Information System (INIS)

    Gurpinar, A.; Serva, L.; Giuliani

    1995-01-01

    Following the request of the Czech Power Board (CEZ) and within the scope of the Technical Cooperation Project CZR/9/003, a progress review of the site safety of the Spent Fuel Central Interim Storage Facility (SFCISF) was performed. The review involved the first two stages of the works comprising the regional survey and identification of candidate sites for the underground and surface storage options. Five sites have been identified as a result of the previous works. The following two stages will involved the identification of the preferred candidate sites for the two options and the final site qualification. The present review had the purpose of assessing the work already performed and making recommendations for the next two stages of works

  7. Disposal facility data for the interim performance

    International Nuclear Information System (INIS)

    Eiholzer, C.R.

    1995-01-01

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 x 2 x 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs

  8. Final hazard classification and auditable safety analysis for the 105-C Reactor Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Larson, A.R.; Dexheimer, D.

    1996-12-01

    This document summarizes the inventories of radioactive and hazardous materials present in the 105-C Reactor Facility and the operations associated with the Interim Safe Storage Project which includes decontamination and demolition and interim safe storage of the remaining facility. This document also establishes a final hazard classification and verifies that appropriate and adequate safety functions and controls are in place to reduce or mitigate the risk associated with those operations

  9. TWRS HLW interim storage facility search and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  10. Interim Safety Basis for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines

  11. 340 Waste Handling Facility interim safety basis

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1995-01-01

    This document establishes the interim safety basis (ISB) for the 340 Waste Handling Facility (340 Facility). An ISB is a documented safety basis that provides a justification for the continued operation of the facility until an upgraded final safety analysis report is prepared that complies with US Department of Energy (DOE) Order 5480.23, Nuclear Safety Analysis Reports. The ISB for the 340 Facility documents the current design and operation of the facility. The 340 Facility ISB (ISB-003) is based on a facility walkdown and review of the design and operation of the facility, as described in the existing safety documentation. The safety documents reviewed, to develop ISB-003, include the following: OSD-SW-153-0001, Operating Specification Document for the 340 Waste Handling Facility (WHC 1990); OSR-SW-152-00003, Operating Limits for the 340 Waste Handling Facility (WHC 1989); SD-RE-SAP-013, Safety Analysis Report for Packaging, Railroad Liquid Waste Tank Cars (Mercado 1993); SD-WM-TM-001, Safety Assessment Document for the 340 Waste Handling Facility (Berneski 1994a); SD-WM-SEL-016, 340 Facility Safety Equipment List (Berneski 1992); and 340 Complex Fire Hazard Analysis, Draft (Hughes Assoc. Inc. 1994)

  12. Interim safety basis for fuel supply shutdown facility

    International Nuclear Information System (INIS)

    Brehm, J.R.; Deobald, T.L.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    This ISB in conjunction with the new TSRs, will provide the required basis for interim operation or restrictions on interim operations and administrative controls for the Facility until a SAR is prepared in accordance with the new requirements. It is concluded that the risk associated with the current operational mode of the Facility, uranium closure, clean up, and transition activities required for permanent closure, are within Risk Acceptance Guidelines. The Facility is classified as a Moderate Hazard Facility because of the potential for an unmitigated fire associated with the uranium storage buildings

  13. 340 waste handling facility interim safety basis

    Energy Technology Data Exchange (ETDEWEB)

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  14. 340 waste handling facility interim safety basis

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people

  15. Effectiveness of interim remedial actions at a radioactive waste facility

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Peterson, J.M.; Seay, W.M.; McNamee, E.

    1989-01-01

    Over the past eight years, several interim remedial actions have been taken at the Niagara Falls Storage Site (NFSS), primarily to reduce radon and gamma radiation exposures and to consolidate radioactive waste into a waste containment facility. Interim remedial actions have included capping of vents, sealing of pipes, relocation of the perimeter fence (to limit radon risk), transfer and consolidation of waste, upgrading of storage buildings, construction of a clay cutoff wall (to limit the potential groundwater transport of contaminants), treatment and release of contaminated water, interim use of a synthetic liner, and emplacement of an interim clay cap. An interim waste containment facility was completed in 1986. 6 refs., 3 figs

  16. Experience with the licensing of the interim spent fuel storage facility modification

    International Nuclear Information System (INIS)

    Bezak, S.; Beres, J.

    1999-01-01

    After political and economical changes in the end of eighties, the utility operating the nuclear power plants in the Slovak Republic (SE, a.s.) decided to change the original scheme of the back-end of the nuclear fuel cycle; instead of reprocessing in the USSR/Russian Federation spent fuel will be stored in an interim spent fuel storage facility until the time of the final decision. As the best solution, a modification of the existing interim spent fuel storage facility has been proposed. Due to lack of legal documents for this area, the Regulatory Authority of the Slovak Republic (UJD SR) performed licensing procedures of the modification on the basis of recommendations by the IAEA, the US NRC and the relevant parts of the US CFR Title 10. (author)

  17. Periodic Safety Review in Interim Storage Facilities - Current Regulation and Experiences in Germany

    International Nuclear Information System (INIS)

    Neles, Julia Mareike; Schmidt, Gerhard

    2014-01-01

    Periodic safety reviews in nuclear power plants in Germany have been performed since the end of the 1980's as an indirect follow-up of the accident in Chernobyl and, in the meantime, are formally required by law. During this process the guidelines governing this review were developed in stages and reached their final form in 1996. Interim storage facilities and other nuclear facilities at that time were not included, so the guidelines were solely focused on the specific safety issues of nuclear power plants. Following IAEA's recommendations, the Western European Nuclear Regulator Association (WENRA) introduced PSRs in its safety reference levels for storage facilities (current version in WGWD report 2.1 as of Feb 2011: SRLs 59 - 61). Based on these formulations, Germany improved its regulation in 2010 with a recommendation of the Nuclear Waste Management Commission (Entsorgungskommission, ESK), an expert advisory commission for the federal regulatory body BMU. The ESK formulated these detailed requirements in the 'ESK recommendation for guides to the performance of periodic safety reviews for interim storage facilities for irradiated fuel elements and heat-generating radioactive waste'. Before finalization of the guideline a test phase was introduced, aimed to test the new regulation in practice and to later include the lessons learned in the final formulation of the guideline. The two-year test phase started in October 2011 in which the performance of a PSR will be tested at two selected interim storage facilities. Currently these recommendations are discussed with interested/concerned institutions. The results of the test phase shall be considered for improvements of the draft and during the final preparation of guidelines. Currently the PSR for the first ISF is in an advanced stage, the second facility just started the process. Preliminary conclusions from the test phase show that the implementation of the draft guideline requires interpretation. The aim of a

  18. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2000-01-01

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility

  19. Centralized interim storage facility for radioactive wastes at Wuerenlingen (ZWILAG)

    International Nuclear Information System (INIS)

    Lutz, H.R.; Schnetzler, U.

    1994-01-01

    Radioactive waste management in Switzerland is the responsibility of the waste producers; in this respect, the law requires permanent, safe management of the wastes by means of final disposal. Nagra is responsible for the research and development work associated with final disposal. Processing of the wastes into a form suitable for disposal, as well as interim storage, remain the responsibility of the waste producers. In order to supplement the existing conditioning and storage facilities at the nuclear power plants and to replace the outdated waste treatment plant at the Paul Scherrer Institute (PSI) at Wuerenlingen, the operators of the Swiss nuclear power plants are planning a joint treatment and storage facility at the PSI-East site. The organisation ''Zwischenlager Wuerenlingen AG'', which was set up at the beginning of 1990, has been entrusted with this task. (author) 4 figs

  20. Tribal child welfare. Interim final rule.

    Science.gov (United States)

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  1. Current status of the first interim spent fuel storage facility in Japan

    International Nuclear Information System (INIS)

    Shinbo, Hitoshi; Kondo, Mitsuru

    2008-01-01

    In Japan, storage of spent fuels outside nuclear power plants was enabled as a result of partial amendments to the Nuclear Reactor Regulation Law in June 2000. Five months later, Mutsu City in Aomori Prefecture asked the Tokyo Electric Power Company (TEPCO) to conduct technical surveys on siting of the interim spent fuel storage facility (we call it 'Recyclable-Fuel Storage Center'). In April 2003, TEPCO submitted the report on siting feasibility examination, concluded that no improper engineering data for siting, construction of the facility will be possible from engineering viewpoint. Siting Activities for publicity and public acceptance have been continued since then. After these activities, Aomori Prefecture and Mutsu City approved siting of the Recyclable Fuel Storage Center in October 2005. Aomori Prefecture, Mutsu City, TEPCO and Japan Atomic Power Company (JAPC) signed an agreement on the interim spent fuel storage Facility. A month later, TEPCO and JAPC established Recyclable-Fuel Storage Company (RFS) in Mutsu City through joint capital investment, specialized in the first interim spent fuel storage Facility in Japan. In May 2007, we made an application for establishment permit, following safety review by regulatory authorities. In March 2008, we started the preparatory construction. RFS will safely store of spent fuels of TEPCO and JAPC until they will be reprocessed. Final storage capacity will be 5,000 ton-U. First we will construct the storage building of 3,000 ton-U to be followed by second building. We aim to start operation by 2010. (author)

  2. Radiation shielding and dose rate evaluation at the interim storage facility for spent fuel from Cernavoda NPP

    International Nuclear Information System (INIS)

    Stanciu, Marcela; Mateescu, Silvia; Pantazi, Doina; Penescu, Maria

    2000-01-01

    At present studies necessary to license the Interim Storage Facility for the Spent Fuel (CANDU type) from Cernavoda NPP are developed in our country.The spent fuel from Cernavoda NPP is discharged into Spent Fuel Bay in Service Building of the plant, where it remains several years for cooling. After this period, the bundles of spent fuel are to be transferred to the Interim Storage Facility.The dry interim storage solution seems to be the most appropriate variant for Cernavoda NPP.The design of the Spent Fuel Interim Storage Facility must meet the applicable safety requirements in order to ensure radiological protection of the personnel, public and environment during all phases of the facility achievement. In this paper we intend to present the calculation of radiation shielding at the spent fuel interim storage facility for two technical solutions: - Concrete Monolithic Module and Concrete Storage Cask. In order to quantify the fuel composition after irradiation, the isotope generation and depletion code ORIGEN 2.1 has been used, taking into account a cooling time of 7 years and 9 years, respectively, for these two variants. The shielding calculations have been performed using the computer codes QAD-5K and MICROSHIELD-4. The evaluations refer only to gamma radiation because the resulting neutron source (from (α,n) reactions and spontaneous fission) is insignificant as compared to the gamma source. The final results consist in the minimum thickness of the shielding and the corresponding external dose rates, ensuring a design average dose rate based on national and international regulations. (authors)

  3. Annex D-200 Area Interim Storage Area Final Safety Analysis Report [FSAR] [Section 1 & 2

    Energy Technology Data Exchange (ETDEWEB)

    CARRELL, R D

    2002-07-16

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft{sup 2} and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped off-site to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the Fast Flux Test Facility (FFTF) SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF) TRIGA'--One Rad-Vault' container will store two DOT-6M3 containers and six NRF TRIGA casks currently stored in the 400 Area. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-I cask4 with an inner commercial light water reactor (LWR) canister, will be used for commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available.

  4. Annex D-200 Area Interim Storage Area Final Safety Analysis Report [FSAR] [Section 1 and 2

    International Nuclear Information System (INIS)

    CARRELL, R.D.

    2002-01-01

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft 2 and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped off-site to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the Fast Flux Test Facility (FFTF) SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF) TRIGA'--One Rad-Vault' container will store two DOT-6M3 containers and six NRF TRIGA casks currently stored in the 400 Area. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-I cask4 with an inner commercial light water reactor (LWR) canister, will be used for commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available

  5. Fast Flux Test Facility interim examination and maintenance cell - past, present, and future

    International Nuclear Information System (INIS)

    Vincent, J.R.

    1990-01-01

    The Fast Flux Test Facility (FFTF) interim examination and maintenance (IEM) cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The first 10 yr of operation were mainly devoted to the disassembly and examination of core component test assemblies. While some maintenance was performed on reactor support equipment, such as the closed-loop ex-vessel machine (CLEM) sodium-wetted grapple, 90% of IEM cell availability has been devoted to core component tests. Some test assemblies originally considered for processing in the IEM cell have not been irradiated; others, not originally planned, have been designed, irradiated, and processed. While no major reactor equipment has required remote repair or maintenance, the IEM cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished and are described

  6. Transuranic waste storage and assay facility (TRUSAF) interim safety basis

    International Nuclear Information System (INIS)

    Gibson, K.D.

    1995-09-01

    The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document

  7. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  8. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-01-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  9. Annex D 200 Area Interim Storage Area Final Safety Analysis Report Volume 5 (FSAR) (Section 1 and 2)

    International Nuclear Information System (INIS)

    CARRELL, R.D.

    2003-01-01

    The 200 Area Interim Storage Area (200 Area ISA) at the Hanford Site provides for the interim storage of non-defense reactor spent nuclear fuel (SNF) housed in aboveground dry cask storage systems. The 200 Area ISA is a relatively simple facility consisting of a boundary fence with gates, perimeter lighting, and concrete and gravel pads on which to place the dry storage casks. The fence supports safeguards and security and establishes a radiation protection buffer zone. The 200 Area ISA is nominally 200,000 ft 2 and is located west of the Canister Storage Building (CSB). Interim storage at the 200 Area ISA is intended for a period of up to 40 years until the materials are shipped offsite to a disposal facility. This Final Safety Analysis Report (FSAR) does not address removal from storage or shipment from the 200 Area ISA. Three different SNF types contained in three different dry cask storage systems are to be stored at the 200 Area ISA, as follows: (1) Fast Flux Test Facility (FFTF) Fuel--Fifty-three interim storage casks (ISC), each holding a core component container (CCC), will be used to store the FFTF SNF currently in the 400 Area. (2) Neutron Radiography Facility (NRF)TRIGA--One Rad-Vault container stores two DOT-6M 3 containers and six NRF TRIGA casks. (3) Commercial Light Water Reactor Fuel--Six International Standards Organization (ISO) containers, each holding a NAC-1 cask with an inner commercial light water reactor (LWR) canister, are used for storing commercial LWR SNF from the 300 Area. An aboveground dry cask storage location is necessary for the spent fuel because the current storage facilities are being shut down and deactivated. The spent fuel is being transferred to interim storage because there is no permanent repository storage currently available

  10. Interim Storage of Spent Nuclear Fuel before Final Disposal in Germany - Regulator's view

    International Nuclear Information System (INIS)

    Arens, G.; Goetz, Ch.; Geupel, Sandra; Gmal, B.; Mester, W.

    2014-01-01

    For spent nuclear fuel management in Germany the concept of dry interim storage in dual purpose casks before direct disposal is applied. The Federal Office for Radiation Protection (BfS) is the competent authority for licensing of interim storage facilities. The competent authority for surveillance of operation is the responsible authority of the respective federal state (Land). Currently operation licenses for storage facilities have been granted for a storage time of 40 years and are based on safety demonstrations for all safety issues as safe enclosure, shielding, sub-criticality and decay heat removal under consideration of operation conditions. In addition, transportability of the casks for the whole storage period has to be provided. Due to current delay in site selection and exploration of a disposal site, an extension of the storage time beyond 40 years could be needed. This will cause appropriate actions by the licensee and the competent authorities as well. A brief description of the regulatory base of licensing and surveillance of interim storage is given from the regulators view. Furthermore the current planning for final disposal of spent nuclear fuel and high level waste and its interconnections between storage and disposal concepts are shortly explained. Finally the relevant aspects for licensing of extended storage time beyond 40 years will be discussed. Current activities on this issue, which have been initiated by the Federal Government, will be addressed. On the regulatory side a review and amendment of the safety guideline for interim storage of spent fuel has been performed and the procedure of periodic safety review is being implemented. A guideline for implementing an ageing management programme is available in a draft version. Regarding safety of long term storage a study focussing on the identification and evaluation of long term effects as well as gaps of knowledge has been finished in 2010. A continuation and update is currently underway

  11. Administrative Court Stade, decision of March 22, 1985 (interim storage facility at Gorleben)

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    This decision deals with the planned interim storage facility of Gorleben (F.R.G.). The provisions introduced by the 4th ammendment to sec. 5 para. 6 and 9a to 9c of the German Atomic Energy Act might contain a definite regulation of the 'Entsorgung' of nuclear power stations. Sec. 6 of the Atomic Energy Act is not applicable to interim storage facilities because irradiated nuclear fuel has a double nature: It is spent fuel and nuclear waste as well. Considering current licensing procedures of construction and operation of nuclear installations in the field of 'Entsorgung', special legal regulations for the construction and operation of an interim storage facility have to be required. (CW)

  12. Application of dose evaluation of the MCNP code for interim spent fuel cask storage facility

    International Nuclear Information System (INIS)

    Kosako, Toshiso; Iimoto, Takeshi; Ishikawa, Satoshi; Tsuboi, Takafumi; Teramura, Masahiro; Okamura, Tomomi; Narumiya, Yoshiyuki

    2007-01-01

    The interim storage facility for spent fuel metallic cask is designed as a concrete building structure with air inlet and outlet for circulating the natural cooling. The feature of the interim storage facility is big capacity of spent fuel at several thousands MTU and restricted site usage. It is important to evaluate realistic dose rate in shielding design of the interim storage facility, therefore the three-dimensional continuous-energy Monte Carlo radiation transport code MCNP that exactly treating the complicated geometry was applied. The validation of dose evaluation for interim storage facility by MCNP code were performed by three kinds of neutron shielding benchmark experiments; cask shadow shielding experiment, duct streaming experiment and concrete deep penetration experiment. Dose rate distributions at each benchmark were measured and compared with the calculated results. The comparison showed a good consistency between calculation and experiment results. (author)

  13. Fuel supply shutdown facility interim operational safety requirements

    International Nuclear Information System (INIS)

    Besser, R.L.; Brehm, J.R.; Benecke, M.W.; Remaize, J.A.

    1995-01-01

    These Interim Operational Safety Requirements (IOSR) for the Fuel Supply Shutdown (FSS) facility define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls to ensure safe operation. The IOSRs apply to the fuel material storage buildings in various modes (operation, storage, surveillance)

  14. Lessons learned from the Siting Process of an Interim Storage Facility in Spain - 12024

    Energy Technology Data Exchange (ETDEWEB)

    Lamolla, Meritxell Martell [MERIENCE Strategic Thinking, 08734 Olerdola, Barcelona (Spain)

    2012-07-01

    On 29 December 2009, the Spanish government launched a site selection process to host a centralised interim storage facility for spent fuel and high-level radioactive waste. It was an unprecedented call for voluntarism among Spanish municipalities to site a controversial facility. Two nuclear municipalities, amongst a total of thirteen municipalities from five different regions, presented their candidatures to host the facility in their territories. For two years the government did not make a decision. Only in November 30, 2011, the new government elected on 20 November 2011 officially selected a non-nuclear municipality, Villar de Canas, for hosting this facility. This paper focuses on analysing the factors facilitating and hindering the siting of controversial facilities, in particular the interim storage facility in Spain. It demonstrates that involving all stakeholders in the decision-making process should not be underestimated. In the case of Spain, all regional governments where there were candidate municipalities willing to host the centralised interim storage facility, publicly opposed to the siting of the facility. (author)

  15. Development of Accident Scenario for Interim Spent Fuel Storage Facility Based on Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dongjin; Choi, Kwangsoon; Yoon, Hyungjoon; Park, Jungsu [KEPCO-E and C, Yongin (Korea, Republic of)

    2014-05-15

    700 MTU of spent nuclear fuel is discharged from nuclear fleet every year and spent fuel storage is currently 70.9% full. The on-site wet type spent fuel storage pool of each NPP(nuclear power plants) in Korea will shortly exceed its storage limit. Backdrop, the Korean government has rolled out a plan to construct an interim spent fuel storage facility by 2024. However, the type of interim spent fuel storage facility has not been decided yet in detail. The Fukushima accident has resulted in more stringent requirements for nuclear facilities in case of beyond design basis accidents. Therefore, there has been growing demand for developing scenario on interim storage facility to prepare for beyond design basis accidents and conducting dose assessment based on the scenario to verify the safety of each type of storage.

  16. Safety of Long-term Interim Storage Facilities - Workshop Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The objective of this workshop was to discuss and review current national activities, plans and regulatory approaches for the safety of long term interim storage facilities dedicated to spent nuclear fuel (SF), high level waste (HLW) and other radioactive materials with prolonged storage regimes. It was also intended to discuss results of experiments and to identify necessary R and D to confirm safety of fuel and cask during the long-term storage. Safety authorities and their Technical Support Organisation (TSO), Fuel Cycle Facilities (FCF) operating organisations and international organisations were invited to share information on their approaches, practices and current developments. The workshop was organised in an opening session, three technical sessions, and a conclusion session. The technical sessions were focused on: - National approaches for long term interim storage facilities; - Safety requirements, regulatory framework and implementation issues; - Technical issues and operational experience, needs for R and D. Each session consisted of a number of presentations followed by a panel discussion moderated by the session Chairs. A summary of each session and subsequent discussion that ensued are provided as well as a summary of the results of the workshop with the text of the papers given and presentations made

  17. 105-H Reactor Interim Safe Storage Project Final Report

    International Nuclear Information System (INIS)

    Ison, E.G.

    2008-01-01

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D and D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  18. Release of radionuclides following severe accident in interim storage facility. Source term determination

    International Nuclear Information System (INIS)

    Morandi, S.; Mariani, M.; Giacobbo, F.; Covini, R.

    2006-01-01

    Among the severe accidents that can cause the release of radionuclides from an interim storage facility, with a consequent relevant radiological impact on the population, there is the impact of an aircraft on the facility. In this work, a safety assessment analysis for the case of an aircraft crash into an interim storage facility is tackled. To this aim a methodology, based upon DOE, IAEA and NUREG standard procedures and upon conservative yet realistic hypothesis, has been developed in order to evaluate the total radioactivity, source term, released to the biosphere in consequence of the impact, without recurring to the use of complicated numerical codes. The procedure consists in the identification of the accidental scenarios, in the evaluation of the consequent damage to the building structures and to the waste packages and in the determination of the total release of radionuclides through the building-atmosphere interface. The methodology here developed has been applied to the case of an aircraft crash into an interim storage facility currently under design. Results show that in case of perforation followed by a fire incident the total released activity would be greater of some orders of magnitude with respect to the case of mere perforation. (author)

  19. Final environmental assessment and Finding-of-No-Significant-Impact - drum storage facility for interim storage of materials generated by environmental restoration operations

    International Nuclear Information System (INIS)

    1994-09-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-0995, for the construction and operation of a drum storage facility at Rocky Flats Environmental Technology Site, Golden, Colorado. The proposal for construction of the facility was generated in response to current and anticipated future needs for interim storage of waste materials generated by environmental restoration operations. A public meeting was held on July 20, 1994, at which the scope and analyses of the EA were presented. The scope of the EA included evaluation of alternative methods of storage, including no action. A comment period from July 5, 1994 through August 4, 1994, was provided to the public and the State of Colorado to submit written comment on the EA. No written comments were received regarding this proposed action, therefore no comment response is included in the Final EA. Based on the analyses in the EA, DOE has determined that the proposed action would not significantly affect the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an Environmental Impact Statement is not required and the Department is issuing this Finding of No Significant Impact

  20. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    International Nuclear Information System (INIS)

    L. V. Street

    2007-01-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility

  1. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1997-01-01

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations

  2. Immobilized low-activity waste interim storage facility, Project W-465 conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Pickett, W.W.

    1997-12-30

    This report outlines the design and Total Estimated Cost to modify the four unused grout vaults for the remote handling and interim storage of immobilized low-activity waste (ILAW). The grout vault facilities in the 200 East Area of the Hanford Site were constructed in the 1980s to support Tank Waste disposal activities. The facilities were to serve project B-714 which was intended to store grouted low-activity waste. The existing 4 unused grout vaults, with modifications for remote handling capability, will provide sufficient capacity for approximately three years of immobilized low activity waste (ILAW) production from the Tank Waste Remediation System-Privatization Vendors (TWRS-PV). These retrofit modifications to the grout vaults will result in an ILAW interim storage facility (Project W465) that will comply with applicable DOE directives, and state and federal regulations.

  3. Interim Control Strategy for the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond - Two-year Update

    Energy Technology Data Exchange (ETDEWEB)

    L. V. Street

    2007-04-01

    The Idaho Cleanup Project has prepared this interim control strategy for the U.S. Department of Energy Idaho Operations Office pursuant to DOE Order 5400.5, Chapter 11.3e (1) to support continued discharges to the Test Area North/Technical Support Facility Sewage Treatment Facility Disposal Pond. In compliance with DOE Order 5400.5, a 2-year review of the Interim Control Strategy document has been completed. This submittal documents the required review of the April 2005 Interim Control Strategy. The Idaho Cleanup Project's recommendation is unchanged from the original recommendation. The Interim Control Strategy evaluates three alternatives: (1) re-route the discharge outlet to an uncontaminated area of the TSF-07; (2) construct a new discharge pond; or (3) no action based on justification for continued use. Evaluation of Alternatives 1 and 2 are based on the estimated cost and implementation timeframe weighed against either alternative's minimal increase in protection of workers, the public, and the environment. Evaluation of Alternative 3, continued use of the TSF-07 Disposal Pond under current effluent controls, is based on an analysis of four points: - Record of Decision controls will protect workers and the public - Risk of increased contamination is low - Discharge water will be eliminated in the foreseeable future - Risk of contamination spread is acceptable. The Idaho Cleanup Project recommends Alternative 3, no action other than continued implementation of existing controls and continued deactivation, decontamination, and dismantlement efforts at the Test Area North/Technical Support Facility.

  4. 42 CFR 413.350 - Periodic interim payments for skilled nursing facilities receiving payment under the skilled...

    Science.gov (United States)

    2010-10-01

    ... facilities receiving payment under the skilled nursing facility prospective payment system for Part A... nursing facilities receiving payment under the skilled nursing facility prospective payment system for... SNF receiving payment under the prospective payment system may receive periodic interim payments (PIP...

  5. Safety report for Central Interim Storage facility for radioactive waste from small producers

    International Nuclear Information System (INIS)

    Zeleznik, N.; Mele, I.

    2004-01-01

    In 1999 the Agency for Radwaste Management took over the management of the Central Interim Storage (CIS) in Brinje, intended only for radioactive waste from industrial, medical and research applications. With the transfer of the responsibilities for the storage operation, ARAO, the new operator of the facility, received also the request from the Slovenian Nuclear Safety Administration for refurbishment and reconstruction of the storage and for preparation of the safety report for the storage with the operational conditions and limitations. In order to fulfill these requirements ARAO first thoroughly reviewed the existing documentation on the facility, the facility itself and the stored inventory. Based on the findings of this review ARAO prepared several basic documents for improvement of the current conditions in the storage facility. In October 2000 the Plan for refurbishment and modernization of the CIS was prepared, providing an integral approach towards remediation and refurbishment of the facility, optimization of the inventory arrangement and modernization of the storage and storing utilization. In October 2001 project documentation for renewal of electric installations, water supply and sewage system, ventilation system, the improvements of the fire protection and remediation of minor defects discovered in building were completed according to the Act on Construction. In July 2003 the safety report was prepared, based on the facility status after the completion of the reconstruction works. It takes into account all improvements and changes introduced by the refurbishment and reconstruction of the facility according to project documentation. Besides the basic characteristics of the location and its surrounding, it also gives the technical description of the facility together with proposed solutions for the renewal of electric installations, renovation of water supply and sewage system, refurbishment of the ventilation system, the improvement of fire

  6. Radioactive waste interim storage in Germany

    International Nuclear Information System (INIS)

    2015-12-01

    The short summary on the radioactive waste interim storage in Germany covers the following issues: importance of interim storage in the frame of radioactive waste management, responsibilities and regulations, waste forms, storage containers, transport of vitrified high-level radioactive wastes from the reprocessing plants, central interim storage facilities (Gorleben, Ahaus, Nord/Lubmin), local interim storage facilities at nuclear power plant sites, federal state collecting facilities, safety, radiation exposure in Germany.

  7. Design review report FFTF interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1995-01-01

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location

  8. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  9. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  10. Technical study of a thermally dense long term interim storage facility

    International Nuclear Information System (INIS)

    Le Duigou, A.; Badie, M.; Duret, B.; Bricard, A.

    2001-01-01

    The COFRE concept is aimed at the surface and thermal densification of the interim storage facility for irradiated fuels. The facility provides the biological shielding. A conditioning cell is used to load and retrieve the fuel assemblies. The facility container is the second containment barrier. The high power levels are managed by an auxiliary cooling system whose original feature is the passive use of a water evaporation-condensation cycle in a sealed circuit. The removable evaporator abuts the container. The air cooled condenser is placed outside the facility. Contact resistance and heat pipe mode were successfully modelled and are undergoing experimental validation on the THERESE and REBECA loops. (author)

  11. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Science.gov (United States)

    2010-07-23

    ... 45 CFR Part 147 Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to... Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and... of Labor; Office of Consumer Information and Insurance Oversight, Department of Health and Human...

  12. Hydrazine blending and storage facility, interim response action, draft implementation document for rinsewater transfer, phase 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-09

    This Draft Implementation Document (ID) for Rinsewater Transfer has been prepared as a requirement for conducting and completing the Interim Response Action (IRA) at the Hydrazine Blending and Storage Facility (HBSF) located at Rocky Mountain Arsenal (RMA) in Commerce City, Colorado. This document has been prepared in accordance with requirements set forth in the October 1988 Final Decision Document for the HBSF IRA (Peer, 1988) and the Amendment to the Final Decision Document (HLA, 1991). The HBSF IRA task was separated into two phases that comprise complete decommissioning of the HBSF as cited in the Federal Facility Agreement. The design portion of Phase I of the HBSF IRA included analytical methods development and laboratory certification for analysis of hydrazine fuel compounds (hydrazine, monomethyl hydrazine) (MMH), and unsymmetrical dimethyl hydrazine (UDMH) and n-nitrosodimethylamine (NDMA) in HBSF rinsewater, chemical characterization of hydrazine rinsewater, bench- and pilot-scale testing of ultraviolet (UV) light/chemical oxidation treatment systems for treatment of hydrazine rinsewater, full-scale startup testing of a UV light/chemical oxidation treatment system, and air monitoring during startup testing as described in the Draft Final Treatment Report (HLA, 1991).

  13. Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    2000-01-01

    This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  14. Waste Encapsulation and Storage Facility interim operational safety requirements

    CERN Document Server

    Covey, L I

    2000-01-01

    The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

  15. Cost Implications of an Interim Storage Facility in the Waste Management System

    Energy Technology Data Exchange (ETDEWEB)

    Jarrell, Joshua J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Joseph, III, Robert Anthony [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Howard, Rob L [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Petersen, Gordon M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Nutt, Mark [Argonne National Lab. (ANL), Argonne, IL (United States); Carter, Joe [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Cotton, Thomas [Complex Systems Group, Bozeman, MT (United States)

    2016-09-01

    This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.

  16. ITER Conceptual design: Interim report

    International Nuclear Information System (INIS)

    1990-01-01

    This interim report describes the results of the International Thermonuclear Experimental Reactor (ITER) Conceptual Design Activities after the first year of design following the selection of the ITER concept in the autumn of 1988. Using the concept definition as the basis for conceptual design, the Design Phase has been underway since October 1988, and will be completed at the end of 1990, at which time a final report will be issued. This interim report includes an executive summary of ITER activities, a description of the ITER device and facility, an operation and research program summary, and a description of the physics and engineering design bases. Included are preliminary cost estimates and schedule for completion of the project

  17. National Ignition Facility Cryogenic Target Systems Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize the National Ignition Facility (NIF) Cryogenic Target Handling Systems (NCTS) Program, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NCTS. Preparation of a Program Execution Plan (PEP) for NCTS has been initiated, and a current draft is provided as Attachment 1 to this document. The National Ignition Facility is a multi-megajoule laser facility being constructed at Lawrence Livermore National Laboratory (LLNL) by the National Nuclear Security Administration (NNSA) in the Department of Energy (DOE). Its primary mission is to support the Stockpile Stewardship Program (SSP) by performing experiments studying weapons physics, including fusion ignition. NIF also supports the missions of weapons effects, inertial fusion energy, and basic science in high-energy-density physics. NIF will be operated by LLNL under contract to the University of California (UC) as a national user facility. NIF is a low-hazard, radiological facility, and its operation will meet all applicable federal, state, and local Environmental Safety and Health (ES and H) requirements. The NCTS Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope, cost, and schedule. The NIF Director controls the NIF Cryogenic Target Systems Interim Management Plan. Overall scope content and execution schedules for the High Energy Density Physics Campaign (SSP Campaign 10) are currently undergoing rebaselining and will be brought into alignment with resources expected to be available throughout the NNSA Future Years National Security Plan (FYNSP). The revised schedule for

  18. Preparation for tritiated waste management of fusion facilities: Interim storage WAC

    Energy Technology Data Exchange (ETDEWEB)

    Decanis, C., E-mail: christelle.decanis@cea.fr [CEA, DEN, Centre de Cadarache, F-13108 Saint-Paul-lez-Durance (France); Canas, D. [CEA, DEN/DADN, Centre de Saclay, F-91191 Gif-sur-Yvette cedex (France); Derasse, F. [CEA, DEN, Centre de Cadarache, F-13108 Saint-Paul-lez-Durance (France); Pamela, J. [CEA, Agence ITER-France, F-13108 Saint-Paul-lez-Durance (France)

    2016-11-01

    Highlights: • Fusion devices including ITER will generate tritiated waste. • Interim storage is the reference solution offering an answer for all types of tritiated radwaste. • Interim storage is a buffer function in the process management and definition of the waste acceptance criteria (WAC) is a key milestone in the facility development cycle. • Defining WAC is a relevant way to identify ahead of time the studies to be launched and the required actions to converge on a detailed design for example material specific studies, required treatment, interfaces management, modelling and monitoring studies. - Abstract: Considering the high mobility of tritium through the package in which it is contained, the new 50-year storage concepts proposed by the French Alternative Energies and Atomic Energy Commission (CEA) currently provide a solution adapted to the management of waste with tritium concentrations higher than the accepted limits in the disposals. The 50-year intermediate storage corresponds to 4 tritium radioactive periods i.e., a tritium reduction by a factor 16. This paper details the approach implemented to define the waste acceptance criteria (WAC) for an interim storage facility that not only takes into account the specificity of tritium provided by the reference scheme for the management of tritiated waste in France, but also the producers’ needs, the safety analysis of the facility and Andra’s disposal requirements. This will lead to define a set of waste specifications that describe the generic criteria such as acceptable waste forms, general principles and specific issues, e.g. conditioning, radioactive content, tritium content, waste tracking system, and quality control. This approach is also a way to check in advance, during the design phase of the waste treatment chain, how the future waste could be integrated into the overall waste management routes and identify possible key points that need further investigations (design changes, selection

  19. Analysis of removal of residual decay heat from interim storage facilities by means of the CFD program FLUENT

    International Nuclear Information System (INIS)

    Stratmann, W.; Hages, P.

    2004-01-01

    Within the scope of nuclear licensing procedures of on-site interim storage facilities for dual purpose casks it is necessary, among other things, to provide proof of sufficient removal of the residual decay heat emitted by the casks. The results of the analyses performed for this purpose define e.g. the boundary conditions for further thermal analyses regarding the permissible cask component temperatures or the maximum permissible temperatures of the fuel cladding tubes of the fuel elements stored in the casks. Up to now, for the centralized interim storage facilities in Germany such analyses were performed on the basis of experimental investigations using scaled-down storage geometries. In the engineering phase of the Lingen on-site interim storage facility, proof was furnished for the first time using the CFD (computational fluid dynamics) program FLUENT. The program FLUENT is an internationally recognized and comprehensively verified program for the calculation of flow and heat transport processes. Starting from a brief discussion of modeling and the different boundary conditions of the computation, this contribution presents various results regarding the temperatures of air, cask surfaces and storage facility components, the mass flows through the storage facility and the heat transfer at the cask surface. The interface point to the cask-specific analyses is defined to be the cask surface

  20. Czech interim spent fuel storage facility: operation experience, inspections and future plans

    International Nuclear Information System (INIS)

    Fajman, V.; Bartak, L.; Coufal, J.; Brzobohaty, K.; Kuba, S.

    1999-01-01

    The paper describes the situation in the spent fuel management in the Czech Republic. The interim Spent Fuel Storage Facility (ISFSF) at Dukovany, which was commissioned in January 1997 and is using dual transport and storage CASTOR - 440/84 casks, is briefly described. The authors deal with their experience in operating and inspecting the ISFSF Dukovany. The structure of the basic safety document 'Limits and Conditions of Normal Operation' is also mentioned, including the experience of the performance. The inspection activities focused on permanent checking of the leak tightness of the CASTOR 440/84 casks, the maximum cask temperature and inspections monitoring both the neutron and gamma dose rate as well as the surface contamination. The results of the inspections are mentioned in the presentation as well. The operator's experience with re-opening partly loaded and already dried CASTOR-440/84 cask, after its transport from NPP Jaslovske Bohunice to the NPP Dukovany is also described. The paper introduces briefly the concept of future spent fuel storage both from the NPP Dukovany and the NPP Temelin, as prepared by the CEZ. The preparatory work for the Central Interim Spent Nuclear Fuel Storage Facility (CISFSF) in the Czech Republic and the information concerning the planned storage technology for this facility is discussed in the paper as well. The authors describe the site selection process and the preparatory steps concerning new spent fuel facility construction including the Environmental Impact Assessment studies. (author)

  1. Report on the long-term interim storage of spent fuels and vitrified wastes; Gutachten zur Langzeitzwischenlagerung abgebrannter Brennelemente und verglaster Abfaelle

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-12-03

    Long-term interim storage for several hundred years is an option on the management of high-level radioactive wastes. The decision on final disposal is postponed. Worldwide the long-term interim storage is not part of the disposal concept - a geologic final repository is the ultimate aim. Using today's technology the interim storage over several hundred years is supposed to be uncritical. Aging management is the most important challenge - the renewal of the facilities would have to be expected. Possible social change and their impact on the interim storage problem has not been considered.

  2. IFMIF (International Fusion Materials Irradiation Facility) key element technology phase interim report

    International Nuclear Information System (INIS)

    Nakamura, Hiroo; Ida, Mizuho; Sugimoto, Masayoshi; Takeuchi, Hiroshi; Yutani, Toshiaki

    2002-03-01

    Activities of International Fusion Materials Irradiation Facility (IFMIF) have been performed under an IEA collaboration since 1995. IFMIF is an accelerator-based deuteron (D + )-lithium (Li) neutron source designed to produce an intense neutron field (2 MW/m 2 , 20 dpa/year for Fe) in a volume of 500 cm 3 for testing candidate fusion materials. In 2000, a 3 year Key Element technology Phase (KEP) of IFMIF was started to reduce the key technology risk factors. This interim report summarizes the KEP activities until mid 2001 in the major project work-breakdown areas of accelerator, target, test facilities and design integration. (author)

  3. Relative risk measure suitable for comparison of design alternatives of interim spent nuclear fuel storage facility

    International Nuclear Information System (INIS)

    Ferjencik, M.

    1997-01-01

    Accessible reports on risk assessment of interim spent nuclear fuel storage facilities presume that only releases of radioactive substances represent undesired consequences. However, only certain part of the undesired consequences is represented by them. Many other events are connected with safety and are able to cause losses to the operating company. The following two presumptions are pronounced based on this. 1. Any event causing a disturbance of a safety function of the storage facility is an incident event. 2. Any disturbance of a safety function is an undesired consequence. If the facility safety functions are identified and if the severity of their disturbances is quantified, then it is possible to combine consequence severity quantifications and event frequencies into a risk measure. Construction and application of such a risk measure is described in this paper. The measure is shown to be a tool suitable for comparison of interim storage technology design alternatives. (author)

  4. IFMIF (International Fusion Materials Irradiation Facility) key element technology phase interim report

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, Hiroo; Ida, Mizuho; Sugimoto, Masayoshi; Takeuchi, Hiroshi; Yutani, Toshiaki (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-03-01

    Activities of International Fusion Materials Irradiation Facility (IFMIF) have been performed under an IEA collaboration since 1995. IFMIF is an accelerator-based deuteron (D{sup +})-lithium (Li) neutron source designed to produce an intense neutron field (2 MW/m{sup 2}, 20 dpa/year for Fe) in a volume of 500 cm{sup 3} for testing candidate fusion materials. In 2000, a 3 year Key Element technology Phase (KEP) of IFMIF was started to reduce the key technology risk factors. This interim report summarizes the KEP activities until mid 2001 in the major project work-breakdown areas of accelerator, target, test facilities and design integration. (author)

  5. Introducing Systematic Aging Management for Interim Storage Facilities in Germany

    International Nuclear Information System (INIS)

    Spieth-Achtnich, Angelika; Schmidt, Gerhard

    2014-01-01

    In Germany twelve at-reactor and three central (away from reactor) dry storage facilities are in operation, where the fuel is stored in combined transport-and-storage casks. The safety of the storage casks and facilities has been approved and is licensed for up to 40 years operating time. If the availability of a final disposal facility for the stored wastes (spent fuel and high-level wastes from reprocessing) will be further delayed the renewal of the licenses can become necessary in future. Since 2001 Germany had a regulatory guideline for at-reactor dry interim storage of spent fuel. In this guideline some elements of ageing were implemented, but no systematic approach was made for a state-of-the-art ageing management. Currently the guideline is updated to include all kind of storage facilities (central storages as well) and all kinds of high level waste (also waste from reprocessing). Draft versions of the update are under discussion. In these drafts a systematic ageing management is seen as an instrument to upgrade the available technical knowledge base for possible later regulatory decisions, should it be necessary to prolong storage periods to beyond the currently approved limits. It is further recognized as an instrument to prevent from possible and currently unrecognized ageing mechanisms. The generation of information on ageing can be an important basis for the necessary safety-relevant verifications for long term storage. For the first time, the demands for a systematic monitoring of ageing processes for all safety-related components of the storage system are described. In addition, for inaccessible container components such as the seal system, the neutron shielding, the baskets and the waste inventory, the development of a monitoring program is recommended. The working draft to the revised guideline also contains recommendations on non-technical ageing issues such as the long-term preservation of knowledge, long term personnel planning and long term

  6. Interim storage of radioactive waste packages

    International Nuclear Information System (INIS)

    1998-01-01

    This report covers all the principal aspects of production and interim storage of radioactive waste packages. The latest design solutions of waste storage facilities and the operational experiences of developed countries are described and evaluated in order to assist developing Member States in decision making and design and construction of their own storage facilities. This report is applicable to any category of radioactive waste package prepared for interim storage, including conditioned spent fuel, high level waste and sealed radiation sources. This report addresses the following issues: safety principles and requirements for storage of waste packages; treatment and conditioning methods for the main categories of radioactive waste; examples of existing interim storage facilities for LILW, spent fuel and high level waste; operational experience of Member States in waste storage operations including control of storage conditions, surveillance of waste packages and observation of the behaviour of waste packages during storage; retrieval of waste packages from storage facilities; technical and administrative measures that will ensure optimal performance of waste packages subject to various periods of interim storage

  7. Interim restorations.

    Science.gov (United States)

    Gratton, David G; Aquilino, Steven A

    2004-04-01

    Interim restorations are a critical component of fixed prosthodontic treatment, biologically and biomechanically. Interim restoration serves an important diagnostic role as a functional and esthetic try-in and as a blueprint for the design of the definitive prosthesis. When selecting materials for any interim restoration, clinicians must consider physical properties, handling properties, patient acceptance, and material cost. Although no single material meets all the requirements and material classification alone of a given product is not a predictor of clinical performance, bis-acryl materials are typically best suited to single-unit restorations, and poly(methylmethacrylate) interim materials are generally ideal for multi-unit, complex, long-term, interim fixed prostheses. As with most dental procedures, the technique used for fabrication has a greater effect on the final result than the specific material chosen.

  8. Interim storage of spent fuel elements in the Paks Nuclear Power Plant, Hungary

    International Nuclear Information System (INIS)

    Szabo, B.

    1998-01-01

    The interim storage of spent fuel cassettes of the Paks NPP provides storage for 50 years at the Paks NPP site. The modular dry storage technology is presented. The technological design and the licensing of the facility has been made by the GEC Alsthom ESL firm. This storage facility can accommodate 450 fuel cassettes until their final disposal. (R.P.)

  9. Transitioning aluminum clad spent fuels from wet to interim dry storage

    International Nuclear Information System (INIS)

    Louthan, M.R. Jr.; Iyer, N.C.; Sindelar, R.L.; Peacock, H.B. Jr.

    1994-01-01

    The United States Department of Energy (DOE) currently owns several hundred metric tons of aluminum clad, spent nuclear fuel and target assemblies. The vast majority of these irradiated assemblies are currently stored in water basins that were designed and operated for short term fuel cooling prior to fuel reprocessing. Recent DOE decisions to severely limit the reprocessing option have significantly lengthened the time of storage, thus increasing the tendency for corrosion induced degradation of the fuel cladding and the underlying core material. The portent of continued corrosion, coupled with the age of existing wet storage facilities and the cost of continuing basin operations, including necessary upgrades to meet current facility standards, may force the DOE to transition these wet stored, aluminum clad spent fuels to interim dry storage. The facilities for interim dry storage have not been developed, partially because fuel storage requirements and specifications for acceptable fuel forms are lacking. In spite of the lack of both facilities and specifications, current plans are to dry store fuels for approximately 40 to 60 years or until firm decisions are developed for final fuel disposition. The transition of the aluminum clad fuels from wet to interim dry storage will require a sequence of drying and canning operations which will include selected fuel preparations such as vacuum drying and conditioning of the storage atmosphere. Laboratory experiments and review of the available literature have demonstrated that successful interim dry storage may also require the use of fuel and canister cleaning or rinsing techniques that preclude, or at least minimize, the potential for the accumulation of chloride and other potentially deleterious ions in the dry storage environment. This paper summarizes an evaluation of the impact of fuel transitioning techniques on the potential for corrosion induced degradation of fuel forms during interim dry storage

  10. Interim geotechnical data report

    International Nuclear Information System (INIS)

    1986-01-01

    This issue, the Interim Geotechnical Field Data Report, presents information obtained from the geotechnical activities at the WIPP site underground facilities since the last quarterly report. It also includes cumulative plots which contain all previous data. Finally, it continues the geotechnical analyses and interpretations of the data. The GFDR is organized into two principal parts. The first part, Geotechnical Field Data, presents in graphical form all the data collected since April 1982 from the geomechanical instruments. Presented in the second part, Evaluation and Analyses, are preliminary interpretations and analyses of the data. In this report, continuing geotechnical assessment of all the facility features is presented. Also included in the second part are separate sections on evaluation and interpretation of the instrumentation measurements, and an updated description and evaluation of observed behavior of the underground openings

  11. Search for a final repository site. How is the status of the preparation of final radioactive waste disposal in Germany?; Endlagersuche. Wie steht es um die Vorbereitung der Entsorgung radioaktiver Abfaelle in Deutschland?

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Monika C.M. (ed.) [Evangelische Akademie Loccum, Rehburg-Loccum (Germany). Arbeitsbereich Naturwissenschaften, Oekologie und Umweltpolitik

    2017-07-01

    During the workshop on the status of the preparation of final radioactive waste disposal in Germany the following issues were discussed: socio-economic challenges two years after the final report of the commission for final disposal of radioactive wastes; the question of public participation - the difficult search for a repository site, experiences and intents of public participation during the work of the commission, interim storage of hear generating radioactive wastes, extended interim-storage, long-term interim storage facilities - opinion of the concerned public, how to establish a controlling and correcting surveillance of the process?.

  12. 77 FR 74512 - Interim Policy Leasing for Renewable Energy Data Collection Facility on the Outer Continental...

    Science.gov (United States)

    2012-12-14

    ... Company to conduct data collection and technology testing activities in one of the following ways: 1... Management Service, now BOEM, announced an interim policy for authorizing the issuance of leases for the installation of offshore data collection and technology testing facilities on the OCS (72 FR 62673). An...

  13. COMPLETION OF THE FIRST INTEGRATED SPENT NUCLEAR FUEL TRANSSHIPMENT/INTERIM STORAGE FACILITY IN NW RUSSIA

    International Nuclear Information System (INIS)

    Dyer, R.S.; Barnes, E.; Snipes, R.L.; Hoeibraaten, S.; Gran, H.C.; Foshaug, E.; Godunov, V.

    2003-01-01

    Northwest and Far East Russia contain large quantities of unsecured spent nuclear fuel (SNF) from decommissioned submarines that potentially threaten the fragile environments of the surrounding Arctic and North Pacific regions. The majority of the SNF from the Russian Navy, including that from decommissioned nuclear submarines, is currently stored in on-shore and floating storage facilities. Some of the SNF is damaged and stored in an unstable condition. Existing Russian transport infrastructure and reprocessing facilities cannot meet the requirements for moving and reprocessing this amount of fuel. Additional interim storage capacity is required. Most of the existing storage facilities being used in Northwest Russia do not meet health and safety, and physical security requirements. The United States and Norway are currently providing assistance to the Russian Federation (RF) in developing systems for managing these wastes. If these wastes are not properly managed, they could release significant concentrations of radioactivity to these sensitive environments and could become serious global environmental and physical security issues. There are currently three closely-linked trilateral cooperative projects: development of a prototype dual-purpose transport and storage cask for SNF, a cask transshipment interim storage facility, and a fuel drying and cask de-watering system. The prototype cask has been fabricated, successfully tested, and certified. Serial production is now underway in Russia. In addition, the U.S. and Russia are working together to improve the management strategy for nuclear submarine reactor compartments after SNF removal

  14. 216-T-4 interim stabilization final report

    International Nuclear Information System (INIS)

    Smith, D.L.

    1996-01-01

    This report provides a general description of the activities performed for the interim stabilization of the 216-T-4-1 ditch, 216-T-4-2 ditch, and 216-T-4-2 pond. Interim stabilization was required to reduce the amount of surface-contaminated acres and to minimize the migration of radioactive contamination. Work associated with the 216-T4-1 ditch and 216-T-4-2 pond was performed by the Radiation Area Remedial Action (RARA) Project. Work associated with the 216-T-4-2 ditch was done concurrently but was funded by Westinghouse Hanford Company (WHC) Tank Waste Remediation Systems (TWRS)

  15. Operator licensing examination standards for power reactors. Interim revision 8

    International Nuclear Information System (INIS)

    1997-01-01

    These examination standards are intended to assist NRC examiners and facility licensees to better understand the processes associated with initial and requalification examinations. The standards also ensure the equitable and consistent administration of examinations for all applicants. These standards are for guidance purposes and are not a substitute for the operator licensing regulations (i.e., 10 CFR Part 55), and they are subject to revision or other changes in internal operator licensing policy. This interim revision permits facility licensees to prepare their initial operator licensing examinations on a voluntary basis pending an amendment to 10 CFR Part 55 that will require facility participation. The NRC intends to solicit comments on this revision during the rulemaking process and to issue a final Revision 8 in conjunction with the final rule

  16. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  17. FFTF [Fast Flux Test Facility]/IEM [Interim Examination and Maintenance] Cell Fuel Pin Weighing System

    International Nuclear Information System (INIS)

    Gibbons, P.W.

    1987-09-01

    A Fuel Pin Weighing Machine has been developed for use in the Fast Flux Test Facility (FFTF) Interim Examination and Maintenance (IEM) Cell to assist in identifying an individual breached fuel pin from its fuel assembly pin bundle. A weighing machine, originally purchased for use in the Fuels and Materials Examination Facility (FMEF) at Hanford, was used as the basis for the IEM Cell system. Design modifications to the original equipment were centered around: 1) adapting the FMEF machine for use in the IEM Cell and 2) correcting operational deficiencies discovered during functional testing in the IEM Cell Mockup

  18. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  19. Operations and Maintenance Concept Plan for the Immobilized High-Level Waste (IHLW) Interim Storage Facility

    International Nuclear Information System (INIS)

    JANIN, L.F.

    2000-01-01

    This OandM Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design

  20. Medicare and Medicaid programs; advance directives--HCFA. Final rule.

    Science.gov (United States)

    1995-06-27

    This final rule responds to public comments on the March 6, 1992 interim final rule with comment period that amended the Medicare and Medicaid regulations governing provider agreements and contracts to establish requirements for States, hospitals, nursing facilities, skilled nursing facilities, providers of home health care or personal care services, hospice programs and managed care plans concerning advance directives. An advance directive is a written instruction, such as a living will or durable power of attorney for health care, recognized under State law, relating to the provision of health care when an individual's condition makes him or her unable to express his or her wishes. The intent of the advance directives provisions is to enhance an adult individual's control over medical treatment decisions. This rule confirms the interim final rule with several minor changes based on our review and consideration of public comments.

  1. Scale economies in a series of generic interim SNF storage facilities - 15104

    International Nuclear Information System (INIS)

    Rothwell, G.

    2015-01-01

    This paper describes a micro-economic, cost-engineering model of a centralized (Generic Interim Storage Facility - GISF) facility to monitor LWR irradiated fuel with particular attention to scale economies (e.g., to compare the likely costs at a power plant site or at regional, national and international facilities). This paper is based on the cost estimates of the Private Fuel Services Facility (PFSF) on the Skull Valley Band of Goshute Indians' Reservation in Utah, licensed by the US NRC in 2006 to centralize storage of 40.000 metric tons of heavy metal (MTHM) for 20 to 40 years. Assuming movement of the 40.000 MTHM every 40 years to a new facility, the levelized costs are 144 dollars/kg without high security and physical protection, and 208 dollars/kg with high security through 2111 (assuming disposal within a century), or about 0.50 dollars/MWh to 0.75 dollars/MWh depending on the burnup and thermal efficiency of the nuclear power plant. This cost estimate is generalized to explore scale economies for facilities with and without high security and physical protection. There are declining levelized costs with increasing size to 120.000 MTHM without high security, and to 500.000 MTHM with high security, i.e., the higher the level of security, the stronger the economies of scale. (author)

  2. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  3. Engineering report for interim solids removal modifications of the Steam Plant Wastewater Treatment Facility

    International Nuclear Information System (INIS)

    1995-04-01

    The Steam Plant Wastewater Treatment Facility (SPWTF) treats wastewater from the Y-12 Plant coal yard, steam plant, and water demineralizer facility. The facility is required to comply with National Pollutant Discharge Elimination System (NPDES) standards prior to discharge to East Fork Poplar Creek (EFPC). The existing facility was designed to meet Best Available Technology (BAT) standards and has been in operation since 1988. The SPWTF has had intermittent violations of the NPDES permit primarily due to difficulties in complying with the limit for total iron of 1.0 ppM. A FY-1997 Line Item project, SPWTF Upgrades, is planned to improve the capabilities of the SPWTF to eliminate non-compliances with the permit limits. The intent of the Interim Solids Removal Modification project is to improve the SPWTF effluent quality and to provide pilot treatment data to assist in the design and implementation of the SPWTF Upgrades Line Item Project

  4. BE (fuel element)/ZL (interim storage facility) module. Constituents of the fuel BE data base for BE documentation with respect to the disposal planning and the support of the BE container storage administration

    International Nuclear Information System (INIS)

    Hoffmann, V.; Deutsch, S.; Busch, V.; Braun, A.

    2012-01-01

    The securing of spent fuel element disposal from German nuclear power plants is the main task of GNS. This includes the container supply and the disposal analysis and planning. Therefore GNS operates a data base comprising all in Germany implemented fuel elements and all fuel element containers in interim storage facilities. With specific program modules the data base serves an optimized repository planning for all spent fuel elements from German NPPS and the supply of required data for future final disposal. The data base has two functional models: the BE (fuel element) and the ZL (interim storage) module. The contribution presents the data structure of the modules and details of the data base operation.

  5. Interim overdentures.

    Science.gov (United States)

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  6. Interim dry cask storage of irradiated Fast Flux Test Facility fuel

    International Nuclear Information System (INIS)

    Scott, P.L.

    1994-09-01

    The Fast Flux Test Facility (FFTF), located at the US Department of Energy's (DOE'S) Hanford Site, is the largest, most modern, liquid metal-cooled test reactor in the world. This paper will give an overview of the FFTF Spent Fuel Off load project. Major discussion areas will address the status of the fuel off load project, including an overview of the fuel off load system and detailed discussion on the individual components that make up the dry cask storage portion of this system. These components consist of the Interim Storage Cask (ISC) and Core Component Container (CCC). This paper will also discuss the challenges that have been addressed in the evolution of this project

  7. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  8. In-situ storage: An approach to interim remedial action - recent case studies in Canada

    International Nuclear Information System (INIS)

    Zelmer, R.L.

    1991-01-01

    The Low-Level Radioactive Waste Management Office (LLRWMO) acts on behalf of the federal government to manage historic low-level radioactive wastes. Recent interim remedial work in the Town of Port Hope, Ontario has included the consolidation of radium and uranium contaminated soils into temporary storage facilities on two sites to await final disposal elsewhere. Simple containments constructed and sited on already contaminated sites have been found effective as part of an interim remedial strategy. The approach has been accepted and supported by the local public. Lessons have been learned from a project management, environmental remediation and engineering design point of view

  9. New York State interim waste management cost evaluation

    International Nuclear Information System (INIS)

    Ma, M.S.; Watts, R.J.; Jorgensen, J.R.; Rochester Gas and Electric Corp., NY)

    1985-01-01

    The purpose of this study is to investigate and quantify the comparative costs associated with including or excluding Class A utility wastes at a centralized interim waste management facility in New York State. The objective of the study is to assess the unit costs and total statewide costs associated with two distinct scenarios: (1) the case where non-utility Class A LLRW is received, incinerated and stored at the centralized interim facility, and utility Class A wastes are held without incineration at respective nuclear power plant interim onsite facilities without incineration; and (2) the alternative case where both utility and non-utility Class A wastes are accepted, incinerated and stored at the centralized facility. Unit costs to waste generators are estimated for each of the two cases described. This is followed by an estimation of the statewide cost impact to the public. The cost impact represents the cost differential resulting from the exclusion of utility Class A waste from the centralized NYS interim waste management facility. The principal factors comprising the cost differential include (1) higher unit disposal fees charged to non-utility waste generators, which are passed along in the costs of products and services; and (2) costs to utilities due to construction of additional onsite storage capacity, which in turn are charged to electric rate payers

  10. General certification procedure of enterprises and interim job enterprises

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This procedure defines the certification global process of enterprises employing workers of A or B category for nuclear facilities and interim job enterprises proposing workers of A or B category for nuclear facilities. This certification proves the enterprises ability to satisfy the specification ''E'' of the CEFRI and the interim job enterprises to satisfy the specification ''I'' of the CEFRI. (A.L.B.)

  11. Flammable gas deflagration consequence calculations for the tank waste remediation system basis for interim operation

    Energy Technology Data Exchange (ETDEWEB)

    Van Vleet, R.J., Westinghouse Hanford

    1996-08-13

    This paper calculates the radiological dose consequences and the toxic exposures for deflagration accidents at various Tank Waste Remediation System facilities. These will be used in support of the Tank Waste Remediation System Basis for Interim Operation.The attached SD documents the originator`s analysis only. It shall not be used as the final or sole document for effecting changes to an authorization basis or safety basis for a facility or activity.

  12. Safety research activities for Japanese regulations of spent fuel interim storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    Japan Nuclear Energy Safety Organization (JNES) carries out (a) preparation of technical documents, (b) technical evaluations of standards (prepared by academic societies), etc. and (c) other R and D activities, to support Nuclear Regulation Authority (NRA: which controls the regulations for Spent Fuel Interim Storage Facilities). In 2012 fiscal year, JNES carried out dynamic test of spent fuel to examine the integrity of spent fuel under cask drop accidents, and preparation for PWR spent fuel storage test to prove long term integrity of spent fuel and cask itself. Some of these tests will be also carried out in 2013 fiscal year and after. (author)

  13. Radiation analysis for a generic centralized interim storage facility

    International Nuclear Information System (INIS)

    Gillespie, S.G.; Lopez, P.; Eble, R.G.

    1997-01-01

    This paper documents the radiation analysis performed for the storage area of a generic Centralized Interim Storage Facility (CISF) for commercial spent nuclear fuel (SNF). The purpose of the analysis is to establish the CISF Protected Area and Restricted Area boundaries by modeling a representative SNF storage array, calculating the radiation dose at selected locations outside the storage area, and comparing the results with regulatory radiation dose limits. The particular challenge for this analysis is to adequately model a large (6000 cask) storage array with a reasonable amount of analysis time and effort. Previous analyses of SNF storage systems for Independent Spent Fuel Storage Installations at nuclear plant sites (for example in References 5.1 and 5.2) had only considered small arrays of storage casks. For such analyses, the dose contribution from each storage cask can be modeled individually. Since the large number of casks in the CISF storage array make such an approach unrealistic, a simplified model is required

  14. Comparative risk assessments for the production and interim storage of glass and ceramic waste forms: defense waste processing facility

    International Nuclear Information System (INIS)

    Huang, J.C.; Wright, W.V.

    1982-04-01

    The Defense Waste Processing Facility (DWPF) for immobilizing nuclear high level waste (HLW) is scheduled to be built at the Savannah River Plant (SRP). High level waste is produced when SRP reactor components are subjected to chemical separation operations. Two candidates for immobilizing this HLW are borosilicate glass and crystalline ceramic, either being contained in weld-sealed stainless steel canisters. A number of technical analyses are being conducted to support a selection between these two waste forms. The present document compares the risks associated with the manufacture and interim storage of these two forms in the DWPF. Process information used in the risk analysis was taken primarily from a DWPF processibility analysis. The DWPF environmental analysis provided much of the necessary environmental information. To perform the comparative risk assessments, consequences of the postulated accidents are calculated in terms of: (1) the maximum dose to an off-site individual; and (2) the dose to off-site population within 80 kilometers of the DWPF, both taken in terms of the 50-year inhalation dose commitment. The consequences are then multiplied by the estimated accident probabilities to obtain the risks. The analyses indicate that the maximum exposure risk to an individual resulting from the accidents postulated for both the production and interim storage of either waste form represents only an insignificant fraction of the natural background radiation of about 90 mrem per year per person in the local area. They also show that there is no disaster potential to the off-site population. Therefore, the risks from abnormal events in the production and the interim storage of the DWPF waste forms should not be considered as a dominant factor in the selection of the final waste form

  15. Facility for low-level solid waste treatment

    International Nuclear Information System (INIS)

    Vicente, R.; Miyamoto, H.

    1987-01-01

    A facility for low-level solid waste compaction, encapsulation and storage is described. Solid wastes are compacted in 200 l drums and stored over concrete platforms covered with canvas, for decay or for interim storage before transport to the final disposal site. (Author) [pt

  16. Basis for Interim Operation for Fuel Supply Shutdown Facility

    International Nuclear Information System (INIS)

    BENECKE, M.W.

    2003-01-01

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the current and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment

  17. 77 FR 60041 - Heating, Cooling, and Lighting Standards for Bureau-Funded Dormitory Facilities

    Science.gov (United States)

    2012-10-02

    ... 1076-AF10 Heating, Cooling, and Lighting Standards for Bureau-Funded Dormitory Facilities AGENCY... confirming the interim final rule published and effective on May 24, 2012, addressing heating, cooling, and... identified in the ``School Facilities Design Handbook'' (handbook) dated March 30, 2007, respecting heating...

  18. 78 FR 59726 - Interim Final Appendix D of OMB Circular No. A-123, “Management's Responsibility for Internal...

    Science.gov (United States)

    2013-09-27

    ... Management Systems'' September 27, 2013. ACTION: Notice. SUMMARY: OMB Circular No. A-123, ``Management's Responsibility for Internal Control,'' defines management's responsibility for internal control in Federal... OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's...

  19. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  20. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  1. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Science.gov (United States)

    2010-11-17

    ... HEALTH AND HUMAN SERVICES Office of Consumer Information and Insurance Oversight 45 CFR Part 147 RIN 0950-AA17 [OCIIO-9991-IFC2] Amendment to the Interim Final Rules for Group Health Plans and Health Insurance... Administration, Department of Labor; Office of Consumer Information and Insurance Oversight, Department of Health...

  2. 75 FR 27121 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Dependent...

    Science.gov (United States)

    2010-05-13

    ... 45 CFR Parts 144, 146, and 147 Group Health Plans and Health Insurance Issuers Relating to Dependent... 144, 146, and 147 RIN 0991-AB66 Interim Final Rules for Group Health Plans and Health Insurance... requirements for group health plans and health insurance issuers in the group and individual markets under...

  3. Concepts for the interim storage of spent fuel elements from research reactors in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Niephaus, D.; Bensch, D.; Quaassdorff, P.; Plaetzer, S.

    1997-01-01

    Research reactors have been operated in the Federal Republic of Germany since the late fifties. These are Material Test Reactors (MTR) and training, Research and Isotope Facilities of General Atomic (TRIGA). A total of seven research reactors, i.e. three TRIGA and four MTR facilities were still in operation at the beginning of 1996. Provisions to apply to the back-end of the fuel cycle are required for their continued operation and for already decommissioned plants. This was ensured until the end of the eighties by the reprocessing of spent fuel elements abroad. In view of impeding uncertainties in connection with waste management through reprocessing abroad, the development of a national back-end fuel cycle concept was commissioned by the Federal Minister of Education, Science, Research and Technology in early 1990. Development work was oriented along the lines of the disposal concept for irradiated light-water reactor fuel elements from nuclear power plants. Analogously, the fuel elements from research reactors are to be interim-stored on a long-term basis in adequately designed transport and storage casks and then be directly finally disposed without reprocessing after up to forty years of interim storage. As a first step in the development of a concept for interim storage, several sites with nuclear infrastructure were examined and assessed with respect to their suitability for interim storage. A reasonably feasible reference concept for storing the research reactor fuel elements in CASTOR MTR 2 transport and storage casks at the Ahaus interim storage facility (BZA) was evaluated and the hot cell facility and AVR store of Forschungszentrum Juelich (KFA) were proposed as an optional contingency concept for casks that cannot be repaired at Ahaus. Development work was continued with detailed studies on these two conceptual variants and the results are presented in this paper. (author)

  4. Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations

    International Nuclear Information System (INIS)

    Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation's first and world's largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage

  5. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    Energy Technology Data Exchange (ETDEWEB)

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  6. Thermal analysis of the unloading cell of the Spanish centralized interim storage facility (CISF)

    International Nuclear Information System (INIS)

    Perez Dominguez, J. R.; Perez Vara, R.; Huelamo Martinez, E.

    2016-01-01

    This article deals with the thermal analysis performed for the Untoading Cell of Spain Centralized Interim Storage Facility, CISF (ATC, in Spanish). The analyses are done using computational fluid dynamics (CFD) simulation, with the aim of obtaining the air flow required to remove the residual heat of the elements stored in the cell. Compliance with the admissible heat limits is checked with the results obtained in the various operation and accident modes. The calculation model is flexible enough to allow carrying out a number of sensitivity analyses with the different parameters involved in the process. (Author)

  7. Multipurpose interim storage facility: first step in cleanup of the Cogema Marcoule site

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, J.M.; Themines, R.; Pasquale, B. [Cogema, 30 - Marcoule (France); Misraki, J. [CIE CODEM Paniscoule, 30 - Bagnols sur Ceze (France); Seurat, Ph. [SGN 30 - Bagnols sur Ceze (France)

    2000-07-01

    The COGEMA's graphite-gas fuel reprocessing plant UP1, located in Marcoule (Gard department in France) as been started up in the late fifties. UP1 has been in the final shutdown process since 1998. The function of the Multi-purpose Interim Storage (EIP) is to receive waste - before treatment and reconditioning, - already treated, waiting for a decision on the final disposal according to the law of december 30. 1991. For the purpose, the design was based on a system of modular storage compartments by kinds of waste and a variety of multi-purpose handling means consistent with the reception of different types of packages. The installation has been designed for a lifetime of 50 years as from the basic design phase. (authors)

  8. Multipurpose interim storage facility: first step in cleanup of the Cogema Marcoule site

    International Nuclear Information System (INIS)

    Cabe, J.M.; Themines, R.; Pasquale, B.; Misraki, J.; Seurat, Ph.

    2000-01-01

    The COGEMA's graphite-gas fuel reprocessing plant UP1, located in Marcoule (Gard department in France) as been started up in the late fifties. UP1 has been in the final shutdown process since 1998. The function of the Multi-purpose Interim Storage (EIP) is to receive waste - before treatment and reconditioning, - already treated, waiting for a decision on the final disposal according to the law of december 30. 1991. For the purpose, the design was based on a system of modular storage compartments by kinds of waste and a variety of multi-purpose handling means consistent with the reception of different types of packages. The installation has been designed for a lifetime of 50 years as from the basic design phase. (authors)

  9. FFTF/IEM [Fast Flux Test Facility/Interim Examination and Maintenance] cell fuel pin weighing system: Remote maintenance design considerations

    International Nuclear Information System (INIS)

    Gibbons, P.W.

    1986-06-01

    A Fuel Pin Weighing Machine has been developed for use in the Fast Flux Test Facility (FFTF) Interim Examination and Maintenance (IEM) Cell to assist in identifying an individual breached fuel pin from its fuel assembly pin bundle. Optimum configuration for remote maintenance was a major consideration in the design of each element of the Pin Weighing System

  10. Addendum to IFMIF-CDA interim report

    Energy Technology Data Exchange (ETDEWEB)

    Maekawa, Hiroshi; Ida, Mizuho [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; eds.

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of `IFMIF-CDA Interim Report` were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the `Interim Report`. This report describes the outline of these modification. (author)

  11. Addendum to IFMIF-CDA interim report

    International Nuclear Information System (INIS)

    Maekawa, Hiroshi; Ida, Mizuho

    1996-08-01

    During the second IFMIF-CDA Design Integration Workshop, the conceptual design and contents of 'IFMIF-CDA Interim Report' were examined and discussed at both general and group meetings. Based on these discussion, the final IFMIF-CDA Report will be modified from the 'Interim Report'. This report describes the outline of these modification. (author)

  12. 78 FR 894 - Interim Final Determination To Stay Sanctions, Imperial County Air Pollution Control District

    Science.gov (United States)

    2013-01-07

    ...EPA is making an interim final determination to stay imposition of sanctions based on a proposed approval of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The revisions concern local rules that regulate inhalable particulate matter (PM10) emissions from sources of fugitive dust such as unpaved roads and disturbed soils in open and agricultural areas in Imperial County.

  13. Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996

    International Nuclear Information System (INIS)

    None

    1997-01-01

    OAK A271 Rockwell International Hot Laboratory decontamination and dismantlement interim progress report 1987-1996. The Rockwell International Hot Laboratory (RIHL) is one of a number of former nuclear facilities undergoing decontamination and decommissioning (D and D) at the Santa Susana Field Laboratory (SSFL). The RIHL facility is in the later stages of dismantlement, with the final objective of returning the site location to its original natural state. This report documents the decontamination and dismantlement activities performed at the facility over the time period 1988 through 1996. At this time, the support buildings, all equipment associated with the facility, and the entire above-ground structure of the primary facility building (Building 020) have been removed. The basement portion of this building and the outside yard areas (primarily asphalt and soil) are scheduled for D and D activities beginning in 1997

  14. Interim guidance risk assessment of the device assembly facility at the Nevada test site

    International Nuclear Information System (INIS)

    Altenbach, T.J.

    1996-05-01

    The risks of plutonium dispersal and/or high explosive detonation from nuclear explosive operations at the Device Assembly Facility were examined in accordance with DOE Order 5610.11 and the Interim Guidance. The assessment consisted of a qualitative task and hazards analysis, and a quantitative risk screening. Results are displayed on risk matrices for the major types of operations. Most accident scenarios were considered to have Low risk; a few scenarios have Moderate risk; and none have High risk. The highest risk scenarios (Moderate category) consist of a high explosive detonation during assembly operations in a cell, with bare conventional high explosive surrounding the pit

  15. Sustainable Solutions for Nuclear used Fuels Interim Storage

    International Nuclear Information System (INIS)

    Arslan, Marc; Favet, Dominique; Issard, Herve; Le Jemtel, Amaury; Drevon, Caroline

    2014-01-01

    AREVA has a unique experience in providing sustainable solutions for used fuel management, fitted with the needs of different customers in the world and with regulation in different countries. These solutions entail both recycling and interim storage technologies. In a first part, we will describe the various types of solutions for Interim Storage of UNF that have been implemented around the world for interim storage at reactor or centralized Pad solution in canisters dry storage, vault type storages for dry storage, dry storage of transportation casks (dual purpose) pools for wet storage, The experience for all these different families of interim storages in which AREVA is involved is extensive and will be discussed with respect to the new challenges: increase of the duration of the interim storage (long term interim storage) increase of burn up of the fuels In a second part of the presentation, special recycling features will be presented. In that case, interim storage of the used fuels is ensured in pools. This provides in the long term good conditions for the behaviour of the fuel and its retrievability. With recycling, the final waste (Universal Canister of vitrified fission products and compacted hulls and end pieces): is stable and licensed in many countries for the final disposal (France, UK, Belgium, NL, Switzerland, Germany, Japan, upcoming: Spain, Australia, Italy). Presents neither safety criticality risks nor proliferation risks (AREVA conditioned HLW and LL-ILW are free of IAEA safeguard constraints thanks to AREVA process high recovery and purification yields). It can therefore be safely stored in interim storage for more than 100 years before final disposal. Some economic considerations will also be discussed. In particular, in the case of long term interim storage of used fuels, there are growing uncertainties regarding the future needs of repackaging and transportation, which can result in future cost overruns. Meanwhile, in the recycling policy

  16. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Science.gov (United States)

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... and Insurance Oversight, Department of Health and Human Services. ACTION: Interim final rules with...

  17. Cost comparisons of wet and dry interim storage facilities for PWR spent nuclear fuel in Korea

    International Nuclear Information System (INIS)

    Cho, Chun-Hyung; Kim, Tae-Man; Seong, Ki-Yeoul; Kim, Hyung-Jin; Yoon, Jeong-Hyoun

    2011-01-01

    Research highlights: → We compare the costs of wet and dry interim storage facilities for PWR spent fuel. → We use the parametric method and quotations to deduce unknown cost items. → Net present values and levelized unit prices are calculated for cost comparisons. → A system price is the most decisive factor in cost comparisons. - Abstract: As a part of an effort to determine the ideal storage solution for pressurized water reactor (PWR) spent nuclear fuel, a cost assessment was performed to better quantify the competitiveness of several storage types. Several storage solutions were chosen for comparison, including three dry storage concepts and a wet storage concept. The net present value (NPV) and the levelized unit cost (LUC) of each solution were calculated, taking into consideration established scenarios and facility size. Wet storage was calculated to be the most expensive solution for a 1700 MTU facility, and metal cask storage marked the highest cost for a 5000 MTU facility. Sensitivity analyses on discount rate, metal cask price, operation and maintenance cost, and facility size revealed that the system price is the most decisive factor affecting competitiveness among the storage types.

  18. Cost comparisons of wet and dry interim storage facilities for PWR spent nuclear fuel in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Chun-Hyung, E-mail: skycho@krmc.or.kr [Korea Radioactive Waste Management Corporation, 1045 Daedeokdaero, Yuseong-Gu, Daejeon 305-353 (Korea, Republic of); Kim, Tae-Man; Seong, Ki-Yeoul; Kim, Hyung-Jin; Yoon, Jeong-Hyoun [Korea Radioactive Waste Management Corporation, 1045 Daedeokdaero, Yuseong-Gu, Daejeon 305-353 (Korea, Republic of)

    2011-05-15

    Research highlights: > We compare the costs of wet and dry interim storage facilities for PWR spent fuel. > We use the parametric method and quotations to deduce unknown cost items. > Net present values and levelized unit prices are calculated for cost comparisons. > A system price is the most decisive factor in cost comparisons. - Abstract: As a part of an effort to determine the ideal storage solution for pressurized water reactor (PWR) spent nuclear fuel, a cost assessment was performed to better quantify the competitiveness of several storage types. Several storage solutions were chosen for comparison, including three dry storage concepts and a wet storage concept. The net present value (NPV) and the levelized unit cost (LUC) of each solution were calculated, taking into consideration established scenarios and facility size. Wet storage was calculated to be the most expensive solution for a 1700 MTU facility, and metal cask storage marked the highest cost for a 5000 MTU facility. Sensitivity analyses on discount rate, metal cask price, operation and maintenance cost, and facility size revealed that the system price is the most decisive factor affecting competitiveness among the storage types.

  19. Dry interim storage of radioactive material in Germany

    International Nuclear Information System (INIS)

    Drobniewski, Christian; Palmes, Julia

    2013-01-01

    In accordance with the waste management concept in Germany, spent fuel is stored in interim storage facilities for a period of up to 40 years until deposition in a geological repository. In twelve on-site interim storages in the vicinity or directly on the sites of the nuclear power plants, spent fuel elements from reactor operation are stored after the necessary period of decay in wet storage basins inside the reactors. Additionally, three central interim storage facilities for storage of spent fuel of different origin are in operation. The German facilities realize the concept of dry interim storage in metallic transport and storage casks. The confinement of the radioactive material is ensured by the double lid system of the casks, of which the leak tightness is monitored constantly. The casks are constructed to provide adequate heat removal and shielding of gamma and neutron radiation. Usually the storage facilities are halls of thick concrete structures, which ensure the removal of the decay heat by natural convection. The main safety goal of the storage concept is to prevent unnecessary exposure of persons, material goods and environment to ionizing radiation. Moreover any exposure should be kept as low as reasonable achievable. To reach this goal the containment of the radioactive materials, the disposal of decay heat, the sub criticality and the shielding of ionizing radiation has to be demonstrated by the applicant and verified by the licensing authority. In particular accidents, incidents and disasters have to be considered in the facility and cask design. This includes mechanical impacts onto the cask, internal and external fire, and environmental effects like wind, rain, snowfall, flood, earthquakes and landslides. In addition civilizatoric influences like plane crashes and explosions have to be taken into account. In all mentioned cases the secure confinement of the radioactive materials has to be ensured. On-site storage facilities have to consider the

  20. Actual Situation and Further Development of Interim Storage of Spent Nuclear Fuel (SNF) and Highly Active Waste (HAW) from the View of the Competent Authority in the Field of section 6

    International Nuclear Information System (INIS)

    Gastl, Christoph; Drobniewski, Christian

    2014-01-01

    According to the German atomic law the storage of nuclear material has to be licensed following section 6 by the competent authority in this field, which is the Federal Office for Radiation Protection. Interim storage in its actual form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facilities and three central storage facilities have been built. The spent nuclear fuel (SNF) and the vitrified high level waste (HAW) will be stored there until final disposal. The time span from now on to the point of opening of a final disposal facility shall be presented from a regulators point of view, divided into different phase which could spread from years to decades. Special attention shall be drawn on the different aspects influencing the licensing process and its duration at the moment and in future including the capabilities of the competent authority. (authors)

  1. Evaluation of Dynamic Behavior of Pile Foundations for Interim Storage Facilities Through Geotechnical Centrifuge Tests

    International Nuclear Information System (INIS)

    Shizuo Tsurumaki; Hiroyuki Watanabe; Akira Tateishi; Kenichi Horikoshi; Shunichi Suzuki

    2002-01-01

    In Japan, there is a possibility that interim storage facilities for recycled nuclear fuel resources may be constructed on quaternary layers, rather than on hard rock. In such a case, the storage facilities need to be supported by pile foundations or spread foundations to meet the required safety level. The authors have conducted a series of experimental studies on the dynamic behavior of storage facilities supported by pile foundations. A centrifuge modeling technique was used to satisfy the required similitude between the reduced size model and the prototype. The centrifuge allows a high confining stress level equivalent to prototype deep soils to be generated (which is considered necessary for examining complex pile-soil interactions) as the soil strength and the deformation are highly dependent on the confining stress. The soil conditions were set at as experimental variables, and the results are compared. Since 2000, the Nuclear Power Engineering Corporation (NUPEC) has been conducting these research tests under the auspices on the Ministry of Economy, Trade and Industry of Japan. (authors)

  2. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Science.gov (United States)

    2011-03-28

    ... design certification (DC) application for new nuclear power reactors under Title 10 of the Code of... NUCLEAR REGULATORY COMMISSION [NRC-2010-0033; DC/COL-ISG-021] Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby...

  3. Radiation shielding at interim storage facility for CANDU-type nuclear spent fuel

    International Nuclear Information System (INIS)

    Mateescu, S.; Radu, M. Pantazi D.; Stanciu, M.

    1997-01-01

    Technical measures in radiological protection are taken in the interim storage facility design to ensure that, during normal operation, exposures of workers and members of public to ionizing radiation are limited to levels lower than regulatory limits. The spent fuel storage design provides for radiation exposure to be as low as reasonable achievable (ALARA principles). The evaluation of radiation shields includes the most conservative provisions: - all locations which may contain spent fuel are full; - the spent fuel has reached the maximum burnup; - the post irradiation cooling period should be the minimum reasonable; - equipment for handling contains the maximum amount of spent fuel. Radiation shields should ensure that external radiation fields do not exceed limits accepted by the Regulatory Body Module. The evaluation has been performed with two computer codes, QAD-5K and MICROSHIELD-4. (authors)

  4. Long-term interim storage concepts with conditioning strategies ensuring compatibility with subsequent disposal or reprocessing

    International Nuclear Information System (INIS)

    Moitrier, C.; Tirel, I.; Villard, C.

    2000-01-01

    The objective of the CEA studies carried out under research topic 3 (long-term interim storage) of the 1991 French radioactive waste management law is to demonstrate the industrial feasibility of a comprehensive, flexible interim storage facility by thoroughly evaluating and comparing all the basic components of various interim storage concepts. In this context, the CEA is considering reference solutions or concepts based on three primary components (the package, the interim storage facility and the site) suitable for determining the specifications of a very long-term solution. Some aspects are examined in greater detail, such as the implementation of long-term technologies, conditioning processes ensuring the absence of water and contamination in the facility, or allowance for radioactive decay of the packages. The results obtained are continually compiled in reports substantiating the design options. These studies should also lead to an overall economic assessment in terms of the capital and operating cost requirements, thereby providing an additional basis for selecting the design options. The comparison with existing industrial facilities highlights the technical and economic progress represented by the new generation of interim storage units. (authors)

  5. The Homestake Interim Laboratory and Homestake DUSEL

    Science.gov (United States)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  6. The Homestake Interim Laboratory and Homestake DUSEL

    International Nuclear Information System (INIS)

    Lesko, Kevin T.

    2011-01-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  7. Specification ''I'' of the CEFRI concerning the interim job enterprises proposing personnel of A or B category to work in nuclear facilities

    CERN Document Server

    Int. At. Energy Agency Wien

    2002-01-01

    This document aims to specify the organization dispositions which have to bee taken by the interim job enterprises proposing personnel of A or B category to work in nuclear facilities. These dispositions should allow to respect the demands of the CEFRI in matter of formation, medical control and personnel dosimetry. (A.L.B.)

  8. 77 FR 24857 - Interim Final Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-04-26

    ...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The revisions concern SJVUAPCD Rule 4352, Solid Fuel Fired Boilers, Steam Generators and Process Heaters.

  9. Materials behavior in interim storage of spent fuel

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Bailey, W.J.; Gilbert, E.R.; Inman, S.C.

    1982-01-01

    Interim storage has emerged as the only current spent-fuel management method in the US and is essential in all countries with nuclear reactors. Materials behavior is a key aspect in licensing interim-storage facilities for several decades of spent-fuel storage. This paper reviews materials behavior in wet storage, which is licensed for light-water reactor (LWR) fuel, and dry storage, for which a licensing position for LWR fuel is developing

  10. Industrial complementarities between interim storage and reversible geological repository - 59237

    International Nuclear Information System (INIS)

    Hoorelbeke, Jean-Michel

    2012-01-01

    The French Act voted in 2006 made the choice of deep geological disposal as the reference option for the long term management of high level (HLW) and intermediate level long-lived waste. The CIGEO repository project aims at avoiding or limiting burden to future generations, which could not be achieved by the extension in time of interim storage. The reversibility as provided by the Act will maintain a liberty of choice for waste management on a duration which is comparable to new storage facility. Interim storage is required to accommodate waste as long as the repository is not available. The commissioning of the repository in 2025 will not suppress needs for interim storage. The paper describes the complementarities between existing and future interim storage facilities and the repository project: repository operational issues and planning, HLW thermal decay, support for the reversibility, etc. It shows opportunities to prepare a global optimization of waste management including the utilization at best of storage capacities and the planning of waste emplacement in the repository in such a way to facilitate operational conditions and to limit cost. Preliminary simulations of storage-disposal scenarios are presented. Thanks to an optimal use of the waste management system, provision can be made for a progressive increase of waste emplacement flow during the first operation phase of the repository. It is then possible to stabilize the industrial activity level of the repository site. An optimal utilization of interim storage can also limit the diversity of waste packages emplaced simultaneously, which facilitates the operation of the repository. 60 years minimum interim storage duration is generally required with respect to HLW thermal output. Extending this interim storage period may reduce the underground footprint of the repository. Regarding reversibility, the capability to manage waste packages potentially retrieved from the repository should be analyzed. The

  11. How the University of Texas system responded to the need for interim storage of low-level radioactive waste materials.

    Science.gov (United States)

    Emery, Robert J

    2012-11-01

    Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.

  12. Integrated system of safety features for spent fuel interim storage

    International Nuclear Information System (INIS)

    Pantazi, Doina; Stanciu, Marcela; Mateescu, Silvia; Marin, Ion

    1999-01-01

    The design of the spent fuel interim storage facility (SFISF) must meet the applicable safety requirements in order to ensure radiological protection of the personnel, public and environment during all phases of the facility. To elaborate the safety documentation necessary for licensing, we were trying to chose the most appropriate approach related to safety features for SFISF, based on national and international regulations, standards and recommendations, as well as on the experience of other countries with similar facilities and finally, on our own experience in designing other nuclear objectives in Romania. The paper presents the issues that we consider important for the safety evaluation and are developed as a detailed diagram. The diagram contains in a logical succession the following issues: - fundamental principles of radioprotection; - fundamental safety principles of radioactive waste management; - safety objectives of SFISF; - safety criteria for SFISF; - safety requirements for SFISF; - siting criteria for SFISF; - siting requirements for SFISF. (authors)

  13. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  14. Effectiveness of interim stage filter in the exhaust system of glove boxes

    International Nuclear Information System (INIS)

    Patre, D.K.; Vangara, H.; Thanamani, S.; Gopalakrishnan, R.K.; Mhatre, Amol M.

    2018-01-01

    All operations in radiochemical laboratories are carried out in containment systems like Glove boxes and Fume hoods. For controlling air contamination two separate air cleaning systems are incorporated. Laboratory has general ventilation system and glove boxes are provided with a negative pressure system (NPS). Glove box exhaust air is passed through three stage filtration systems: in situ, interim and final before discharging to the atmosphere. In addition to the individual HEPA filters of each glove box, there is an interim HEPA filter bank introduced at the laboratory end. This was introduced to reduce a load on main exhaust filter system. Finally the exhaust air is discharged through the final stage HEPA filter located in the filter house through the Stack. The interim HEPA filter bank provides additional protection for the release of particulate activity and reduces load on the final stage filters. In the present work efforts have been put to validate the interim stage filter, which has been introduced, to limit the environmental release

  15. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  16. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage

  17. Subsurface Interim Measures/Interim Remedial Action Plan and Decision Document for the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2)

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy (DOE) is pursuing an Interim Measure/Interim Remedial Action (IM/IRA) at the 903 Pad, Mound, and East Trenches Areas (Operable Unit No. 2) at the Rocky Flats Plant (RFP). This MIRA is to be conducted to provide information that will aid in the selection and design of final remedial actions at OU2 that will address removal of suspected free-phase volatile organic compound (VOC) contamination. The Plan involves investigating the removal of residual free-phase VOCs by in situ vacuum-enhanced vapor extraction technology at 3 suspected VOC source areas within OU2. VOC-contaminated vapors extracted from the subsurface would be treated by granular activated carbon (GAC) adsorption and discharged. The Plan also includes water table depression, when applicable at the test sites, to investigate the performance of vapor extraction technology in the saturated zone. The Plan provides for treatment of any contaminated ground water recovered during the IM/IRA at existing RFP treatment facilities. The proposed MVIRA Plan is presented in the document entitled ''Proposed Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, 903 Pad, Mound, and East Trenches Areas, Operable Unit No. 2, '' dated 20 March 1992. Information concerning the proposed Subsurface IM/IRA was presented during a DOE Quarterly Review meeting held on 07 April 1992 and a public meeting held on 07 May 1992, at the Marriott Hotel in Golden, Colorado. The Responsiveness Summary presents DOE's response to all comments received at the public meeting, as well as those mailed to date to DOE during the public comment period

  18. 78 FR 12243 - Interim Final Determination To Stay and Defer Sanctions, Placer County Air Pollution Control...

    Science.gov (United States)

    2013-02-22

    ...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The SIP revision concerns two permitting rules submitted by the PCAPCD and FRAQMD, respectively: Rule 502, New Source Review, and Rule 10.1, New Source Review.

  19. Glass packages in interim storage

    International Nuclear Information System (INIS)

    Jacquet-Francillon, N.

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO 2 . The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ''source term'' models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs

  20. Interim Storage Facility for LLW of Decommissioning Nuclear Research Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Amato, S.; Ugolini, D.; Basile, F. [European Commission, Joint Research Centre, Nuclear Decommissioning and Facility Management Unit, TP 800, Via E. Fermi 2749, 21027 Ispra - VA (Italy)

    2009-06-15

    JRC-Ispra has initiated a Decommissioning and Waste Management (D and WM) Programme of all its nuclear facilities. In the frame of this programme, it has been decided to build an interim storage facility to host conditioned low level waste (LLW) that had been produced during the operation of JRC-Ispra nuclear research reactors and laboratories and that will be produced from their decommissioning. This paper presents the main characteristics of the facility. The storage ISFISF has a rectangular shape with uniform height and it is about 128 m long, 41 m wide and 9 m high. The entire surface affected by the facility, including screening area and access roads, is about 27.000 m{sup 2}. It is divided in three sectors, a central one, about 16 m long, for loading/unloading operations and operational services and two lateral sectors, each about 55 m long, for the conditioned LLW storage. Each storage sector is divided by a concrete wall in two transversal compartments. The ISFISF, whose operational lifetime is 50 years, is designed to host the conditioned LLW boxed in UNI CP-5.2 packages, 2,5 m long, 1.65 m wide, and 1,25 m high. The expected nominal inventory of waste is about 2100 packages, while the maximum storage is 2540 packages, thus a considerably large reserve capacity is available. The packages will be piled in stacks of maximum number of five. The LLW is going to be conditioned with a cement matrix. The maximum weight allowed for each package has been fixed at 16.000 kg. The total radioactivity inventory of waste to be hosted in the facility is about 30 TBq (mainly {beta}/{gamma} emitters). In order to satisfy the structural, seismic, and, most of all, radiological requirements, the external walls of the ISFISF are made of pre-fabricated panels, 32 cm thick, consisting of, from inside to outside, 20 cm of reinforced concrete, 7 cm of insulating material, and again 5 cm of reinforced concrete. For the same reason the roof is made with pre-fabricated panels in

  1. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    International Nuclear Information System (INIS)

    Burgard, K.C.

    1998-01-01

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis

  2. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  3. Benchmarking of MCNP for calculating dose rates at an interim storage facility for nuclear waste.

    Science.gov (United States)

    Heuel-Fabianek, Burkhard; Hille, Ralf

    2005-01-01

    During the operation of research facilities at Research Centre Jülich, Germany, nuclear waste is stored in drums and other vessels in an interim storage building on-site, which has a concrete shielding at the side walls. Owing to the lack of a well-defined source, measured gamma spectra were unfolded to determine the photon flux on the surface of the containers. The dose rate simulation, including the effects of skyshine, using the Monte Carlo transport code MCNP is compared with the measured dosimetric data at some locations in the vicinity of the interim storage building. The MCNP data for direct radiation confirm the data calculated using a point-kernel method. However, a comparison of the modelled dose rates for direct radiation and skyshine with the measured data demonstrate the need for a more precise definition of the source. Both the measured and the modelled dose rates verified the fact that the legal limits (<1 mSv a(-1)) are met in the area outside the perimeter fence of the storage building to which members of the public have access. Using container surface data (gamma spectra) to define the source may be a useful tool for practical calculations and additionally for benchmarking of computer codes if the discussed critical aspects with respect to the source can be addressed adequately.

  4. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  5. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    Science.gov (United States)

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  6. KEWB facilities decontamination and disposition. Final report

    International Nuclear Information System (INIS)

    Ureda, B.F.

    1976-01-01

    The decontamination and disposition of the KEWB facilities, Buildings 073, 643, 123, and 793, are complete. All of the facility equipment, including reactor enclosure, reactor vessel, fuel handling systems, controls, radioactive waste systems, exhaust systems, electrical services, and protective systems were removed from the site. Buildings 643, 123, and 793 were completely removed, including foundations. The floor and portions of the walls of Building 073 were covered over by final grading. Results of the radiological monitoring and the final survey are presented. 9 tables, 19 figures

  7. 2727-S Nonradioactive Dangerous Waste Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    Wilczek, T.A.; Laws, J.R.; Izatt, R.D.

    1992-01-01

    This closure plan describes the activities for final closure of the 2727-S Nonradioactive Dangerous Waste Storage (NRDWS) Facility at the Hanford Site. The 2727-S NRDWS Facility provided container storage for nonradioactive dangerous and extremely hazardous wastes generated in the research and development laboratories, process operations, and maintenance and transportation functions throughout the Hanford Site. Storage operations began at the 2727-S NRDWS Facility March 14, 1983, and continued until December 30, 1986, when the last shipment of materials from the facility took place. These storage operations have been moved to the new 616 NRDWS Facility, which is an interim status unit located between the 200 East and 200 West Areas of the Hanford Site

  8. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  9. 200-ZP-1 phase 2 interim remedial measure quarterly report, August--October 1996

    International Nuclear Information System (INIS)

    Freeman-Pollard, J.R.; Jacques, I.D.; McMahon, W.J.; Singleton, K.M.; Strope, S.A.; Swanson, L.C.; Windmueller, C.R.

    1996-11-01

    A groundwater pump-and-treat system is being operated in the 200-ZP-1 Operable Unit under authority of the Hanford Federal Facility Agreement and Consent Order . The purpose of the pump-and-treat system is to accomplish the following: Minimize further migration of the high-concentration portion of the carbon tetrachloride plume and co-contaminants chloroform and trichlorethylene in the 200-ZP-1 Operable Unit Provide data for evaluation of final remedy selection. The 200-ZP-1 pump-and-treat operations were conducted as a pilot-scale treatability test and interim remedial measure treatment system between August 1994 and July 1996 to assess the effectiveness of liquid-phase granular activated carbon carbon tetrachloride removal. The pilot-scale treatability test's removal efficiently was determined to be 99.96% for carbon tetrachloride, chloroform, and trichloroethylene. This report summarizes and evaluates treatment, hydraulic, and hydrochemistry data collected for the 200-ZP-1 interim remedial measure from August through September 1996

  10. ISOE EG-SAM interim report - Report on behalf of the Sub expert Group

    International Nuclear Information System (INIS)

    Harris, Willie; Miller, David W.; Djeffal, Salah; Anderson, Ellen; Couasnon, Olivier; Hagemeyer, Derek; Sovijarvi, Jukka; Amaral, Marcos A.; Tarzia, J.P.; Schmidt, Claudia; Fritioff, Karin; Kaulard, Joerg; Lance, Benoit; Fritioff, Karin; Schieber, Caroline; Hayashida, Yoshihisa; Doty, Rick

    2014-01-01

    During its November 2012 meeting, the expert group decided to develop an interim (preliminary) report before the end of 2013 (with a general perspective and discussion of specific severe accident management worker dose issues), and to finalize the report by organizing the international workshop of 2014 to address national experiences, which will be incorporated to the report. The work of the EG-SAM focuses on radiation protection management and organization, radiation protection training and exercises related to severe accident management, facility configuration and readiness, worker protection, radioactive materials, contamination controls and logistics and key lessons learned especially from the TMI, Chernobyl and Fukushima Dai-ichi accidents. This interim report was completed through intensive work of all Group members nominated by the ISOE, and was accomplished during EG-SAM meetings through 2012-2013. This document gathers the different presentations given by the sub expert groups in charge of each chapter of the report

  11. Thermo-aeraulics of high level waste storage facilities

    International Nuclear Information System (INIS)

    Lagrave, Herve; Gaillard, Jean-Philippe; Laurent, Franck; Ranc, Guillaume; Duret, Bernard

    2006-01-01

    This paper discusses the research undertaken in response to axis 3 of the 1991 radioactive waste management act, and possible solutions concerning the processes under consideration for conditioning and long-term interim storage of long-lived radioactive waste. The notion of 'long-term' is evaluated with respect to the usual operating lifetime of a basic nuclear installation, about 50 years. In this context, 'long-term' is defined on a secular time scale: the lifetime of the facility could be as long as 300 years. The waste package taken into account is characterized notably by its high thermal power release. Studies were carried out in dedicated facilities for vitrified waste and for spent UOX and MOX fuel. The latter are not considered as wastes, owing to the value of the reusable material they contain. Three primary objectives have guided the design of these long-term interim storage facilities: - ensure radionuclide containment at all times; - permit retrieval of the containers at any time; - minimize surveillance; - maintenance costs. The CEA has also investigated surface and subsurface facilities. It was decided to work on generic sites with a reasonable set of parameters values that should be applicable at most sites in France. All the studies and demonstrations to date lead to the conclusion that long-term interim storage is technically feasible. The paper addresses the following items: - Long-term interim storage concepts for high-level waste; - Design principles and options for the interim storage facilities; - General architecture; - Research topics, Storage facility ventilation, Dimensioning of the facility; - Thermo-aeraulics of a surface interim storage facility; - VALIDA surface loop, VALIDA single container test campaign, Continuation of the VALIDA program; - Thermo-aeraulics of a network of subsurface interim storage galleries; - SIGAL subsurface loop; - PROMETHEE subsurface loop; - Temperature behaviour of the concrete structures; - GALATEE

  12. Thermo-aeraulics of high level waste storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lagrave, Herve; Gaillard, Jean-Philippe; Laurent, Franck; Ranc, Guillaume [CEA/Valrho, B.P. 17171, F-30207 Bagnols-sur-Ceze (France); Duret, Bernard [CEA Grenoble, 17 rue des Martyrs, 38054 Grenoble cedex 9 (France)

    2006-07-01

    This paper discusses the research undertaken in response to axis 3 of the 1991 radioactive waste management act, and possible solutions concerning the processes under consideration for conditioning and long-term interim storage of long-lived radioactive waste. The notion of 'long-term' is evaluated with respect to the usual operating lifetime of a basic nuclear installation, about 50 years. In this context, 'long-term' is defined on a secular time scale: the lifetime of the facility could be as long as 300 years. The waste package taken into account is characterized notably by its high thermal power release. Studies were carried out in dedicated facilities for vitrified waste and for spent UOX and MOX fuel. The latter are not considered as wastes, owing to the value of the reusable material they contain. Three primary objectives have guided the design of these long-term interim storage facilities: - ensure radionuclide containment at all times; - permit retrieval of the containers at any time; - minimize surveillance; - maintenance costs. The CEA has also investigated surface and subsurface facilities. It was decided to work on generic sites with a reasonable set of parameters values that should be applicable at most sites in France. All the studies and demonstrations to date lead to the conclusion that long-term interim storage is technically feasible. The paper addresses the following items: - Long-term interim storage concepts for high-level waste; - Design principles and options for the interim storage facilities; - General architecture; - Research topics, Storage facility ventilation, Dimensioning of the facility; - Thermo-aeraulics of a surface interim storage facility; - VALIDA surface loop, VALIDA single container test campaign, Continuation of the VALIDA program; - Thermo-aeraulics of a network of subsurface interim storage galleries; - SIGAL subsurface loop; - PROMETHEE subsurface loop; - Temperature behaviour of the concrete

  13. Spent fuel interim management: 1995 update

    International Nuclear Information System (INIS)

    Anderson, C.K.

    1995-01-01

    The problems of interim away-from-reactor spent fuel storage and storage in spent fuel pools at the reactor site are discussed. An overview of the state-of-the-art in the USA, Europe, and Japan is presented. The technical facilities for away-from-reactor storage are briefly described, including wet storage pools, interactive concrete systems, metallic containers, and passive concrete systems. Reprocessing technologies are mostly at the design stage only. It is predicted that during the 20 years to come, about 50 000 tonnes of spent fuel will be stored at reactor sites regardless of the advance of spent fuel reprocessing or interim storage projects. (J.B.). 4 tabs., 2 figs

  14. Design of spent fuel storage facilities

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide is for interim spent fuel storage facilities that are not integral part of an operating nuclear power plant. Following the introduction, Section 2 describes the general safety requirements applicable to the design of both wet and dry spent fuel storage facilities; Section 3 deals with the design requirements specific to either wet or dry storage. Recommendations for the auxiliary systems of any storage facility are contained in Section 4; these are necessary to ensure the safety of the system and its safe operation. Section 5 provides recommendations for establishing the quality assurance system for a storage facility. Section 6 discusses the requirements for inspection and maintenance that must be considered during the design. Finally, Section 7 provides guidance on design features to be considered to facilitate eventual decommissioning. 18 refs

  15. Concept study for interim storage of research reactor fuel elements in transport and storage casks. Transport and storage licensing procedure for the CASTOR MTR 2 cask. Final report

    International Nuclear Information System (INIS)

    Weiss, M.

    2001-01-01

    As a result of the project, a concept was to be developed for managing spent fuel elements from research reactors on the basis of the interim storage technology existing in Germany, in order to make the transition to direct disposal possible in the long term. This final report describes the studies for the spent fuel management concept as well as the development of a transport and storage cask for spent fuel elements from research reactors. The concept analyses were based on data of the fuel to be disposed of, as well as the handling conditions for casks at the German research reactors. Due to the quite different conditions for handling of casks at the individual reactors, it was necessary to examine different cask concepts as well as special solutions for loading the casks outside of the spent fuel pools. As a result of these analyses, a concept was elaborated on the basis of a newly developed transport and storage cask as well as a mobile fuel transfer system for the reactor stations, at which a direct loading of the cask is not possible, as the optimal variant. The cask necessary for this concept with the designation CASTOR trademark MTR 2 follows in ist design the tried and tested principles of the CASTOR trademark casks for transport and interim storage of spent LWR fuel. With the CASTOR trademark MTR 2, it is possible to transport and to place into long term interim storage various fuel element types, which have been and are currently used in German research reactors. The technical development of the cask has been completed, the documents for the transport license as type B(U)F package design and for obtaining the storage license at the interim storage facility of Ahaus have been prepared, submitted to the licensing authorities and to a large degree already evaluated positively. The transport license of the CASTOR trademark MTR 2 has been issued for the shipment of VKTA-contents and FRM II compact fuel elements. (orig.)

  16. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  17. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  18. Immobilized High-Level Waste (HLW) Interim Storage Alternative Generation and analysis and Decision Report - second Generation Implementing Architecture

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    2000-01-01

    Two alternative approaches were previously identified to provide second-generation interim storage of Immobilized High-Level Waste (IHLW). One approach was retrofit modification of the Fuel and Materials Examination Facility (FMEF) to accommodate IHLW. The results of the evaluation of the FMEF as the second-generation IHLW interim storage facility and subsequent decision process are provided in this document

  19. Improving of spent fuel monitoring in condition of Slovak wet interim spent fuel storage facility

    International Nuclear Information System (INIS)

    Miklos, M.; Krsjak, V.; Bozik, M.; Vasina, D.

    2008-01-01

    Monitoring of WWER fuel assemblies condition in Slovakia is presented in the paper. The leak tightness results of fuel assemblies used in Slovak WWER units in last 20 years are analyzed. Good experiences with the 'Sipping system' are described. The Slovak wet interim spent fuel storage facility in NPP Jaslovske Bohunice was build and put in operation in 1986. Since 1999, leak tests of WWER-440 fuel assemblies are provided by special leak tightness detection system 'Sipping in Pool' delivered by Framatome-ANP facility with external heating for the precise detection of active specimens. Another system for monitoring of fuel assemblies condition was implemented in December 2006 under the name 'SVYPP-440'. First non-active tests started at February 2007 and are described in the paper. Although those systems seems to be very effective, the detection time of all fuel assemblies in one storage pool is too long (several months). Therefore, a new 'on-line' detection system, based on new sorbent KNiFC-PAN for effective 134 Cs and 137 Cs activity was developed. This sorbent was compared with another type of sorbent NIFSIL and results are presented. The design of this detection system and its possible application in the Slovak wet spent fuel storage facility is discussed. For completeness, the initial results of the new system are also presented. (authors)

  20. Interim storage report

    International Nuclear Information System (INIS)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration

  1. Environmental Survey preliminary report, Pantex Facility, Amarillo, Texas

    International Nuclear Information System (INIS)

    1987-09-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Pantex Facility, conducted November 3 through 14, 1986.The Survey is being conducted by an interdisciplinary team of environmental specialist, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Pantex Facility. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Pantex Facility, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory. When completed, the results will be incorporated into the Pantex Facility Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the Pantex Facility. 65 refs., 44 figs., 27 tabs

  2. Environmental Survey preliminary report, Pantex Facility, Amarillo, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1987-09-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Pantex Facility, conducted November 3 through 14, 1986.The Survey is being conducted by an interdisciplinary team of environmental specialist, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Pantex Facility. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Pantex Facility, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by the Oak Ridge National Laboratory. When completed, the results will be incorporated into the Pantex Facility Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the Survey for the Pantex Facility. 65 refs., 44 figs., 27 tabs.

  3. Use of alternative dispute resolution--HHS. Notice of interim policy.

    Science.gov (United States)

    1992-10-27

    The Department has developed an interim policy to address the use of alternative dispute resolution (ADR) as required by the Administrative Dispute Resolution Act (ADR Act), Public Law No. 101-552. This interim policy also responds to the Negotiated Rulemaking Act, Public Law No. 101-648, and relevant elements of the Executive Order on Civil Justice Reform (E.O. 12778). The Department is adopting an interim policy because we need a baseline of experience and knowledge from our own pilot activities and those of other agencies before finalizing a policy.

  4. State child health; revisions to the regulations implementing the State Children's Health Insurance Program. Interim final rule with comment period; revisions, delay of effective date, and technical amendments to final rule.

    Science.gov (United States)

    2001-06-25

    Title XXI authorizes the State Children's Health Insurance Program (SCHIP) to assist State efforts to initiate and expand the provision of child health assistance to uninsured, low-income children. On January 11, 2001 we published a final rule in the Federal Register to implement SCHIP that has not gone into effect. This interim final rule further delays the effective date, revises certain provisions and solicits public comment, and makes technical corrections and clarifications to the January 2001 final rule based on further review of the comments received and applicable law. Only the provisions set forth in this document have changed. All other provisions set forth in the January 2001 final rule will be implemented without change.

  5. Acceptable TRU packaging for interim storage and/or terminal isolation: FY-1977 final report

    International Nuclear Information System (INIS)

    Doty, J.W.; Peterson, J.B.

    1978-01-01

    A program was conducted for the definition and demonstration of acceptable waste packages for defense transuranic waste for interim storage and terminal isolation. During FY-1977, a Contractor Questionnaire was used to gather pertinent data and to assess contractor concerns. This information was integrated into basic application data in the form of a checklist. Conceptual Container Design Specifications were developed by analyzing and evaluating the application data against Federal Regulations and interim/terminal storage constraints

  6. Options for the interim storage of spent fuel

    International Nuclear Information System (INIS)

    Kromar, M.; Kurincic, B.

    1995-01-01

    Different concepts for the interim storage of spent fuel arising from operation of a NPP are discussed. We considered at reactor as well as away from reactor storage options. Included are enhancements of existing storage capabilities and construction of a new wet or dry storage facility. (author)

  7. On-site interim storage of spent nuclear fuel: Emerging public issues

    International Nuclear Information System (INIS)

    Feldman, D.L.; Tennessee Univ., Knoxville, TN

    1992-01-01

    Failure to consummate plans for a permanent repository or above- ground interim Monitored Retrievable Storage (MRS) facility for spent nuclear fuel has spurred innovative efforts to ensure at-reactor storage in an environmentally safe and secure manner. This article examines the institutional and socioeconomic impacts of Dry Cask Storage Technology (DCST)-an approach to spent fuel management that is emerging as the preferred method of on-site interim spent fuel storage by utilities that exhaust existing storage capacity

  8. Criteria for designing an interim waste storage facility

    International Nuclear Information System (INIS)

    Vicente, Roberto

    2011-01-01

    The long-lived radioactive wastes with activity above clearance levels generated by radioisotope users in Brazil are collected into centralized waste storage facilities under overview of the National Commission on Nuclear Energy (CNEN). One of these centers is the Radioactive Waste Management Department (GRR) at the Nuclear and Energy Research Institute (IPEN), in Sao Paulo, which since 1978 also manages the wastes generated by IPEN itself. Present inventory of stored wastes includes about 160 tons of treated wastes, distributed in 1290 steel, 200-liters drums, and 52 steel, 1.6 m 3 -boxes, with an estimated total activity of 0.8 TBq. Radionuclides present in these wastes are fission and activation products, transuranium elements, and isotopes from the uranium and thorium decay series. The capacity and quality of the storage rooms at GRR evolved along the last decades to meet the requirements set forth by the Brazilian regulatory authorities.From a mere outdoor concrete platform over which drums were simply stacked and covered with canvas to the present day building, a great progress was made in the storage method. In this paper we present the results of a study in the criteria that were meant to guide the design of the storage building, many of which were eventually adopted in the final concept, and are now built-in features of the facility. We also present some landmarks in the GRR's activities related to waste management in general and waste storage in particular, until the treated wastes of IPEN found their way into the recently licensed new storage facility. (author)

  9. 7 CFR 1710.109 - Reimbursement of general funds and interim financing.

    Science.gov (United States)

    2010-01-01

    ... LOANS AND GUARANTEES Loan Purposes and Basic Policies § 1710.109 Reimbursement of general funds and... replace interim financing used to finance equipment and facilities that were included in an RUS-approved...

  10. 1998 interim 242-A Evaporator tank system integrity assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-07-02

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  11. 1998 interim 242-A Evaporator tank system integrity assessment report

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ''dangerous waste storage or treatment tank and its ancillary equipment and containment.'' This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD

  12. Word protocol of the public hearing concerning the projected interim storage facility at Ahaus, June 21-29, 1983. Pt. 1-3

    International Nuclear Information System (INIS)

    1983-01-01

    According to the procedural regulations under atomic law (Sect. 9, Atomic Energy Act; Sect. 3, Radiation Protection Ordinance, Federal Construction Act), a public hearing concerning the projected interim storage facility at Ahaus was not mandatory. It was held, however, for political reasons in order to assure public acceptance of the project. The word protocol of the controversial discussions is presented in three volumes. The discussions covered the whole spectrum of the 15-year-old nuclear controversy in West Germany including the effects of low radiation doses and nuclear waste management. (HP) [de

  13. Auditable Safety Analysis and Final Hazard Classification for the 105-N Reactor Zone and 109-N Steam Generator Zone Facility

    International Nuclear Information System (INIS)

    Kloster, G.L.

    1998-07-01

    This document is a graded auditable safety analysis (ASA) and final hazard classification (FHC) for the Reactor/Steam Generator Zone Segment. The Reactor/Steam Generator Zone Segment, part of the N Reactor Complex, that is also known as the Reactor Building and Steam Generator Cells. The installation of the modifications described within to support surveillance and maintenance activities are to be completed by July 1, 1999. The surveillance and maintenance activities addressed within are assumed to continue for the next 15- 20 years, until the initiation of facility D ampersand D (i.e., Interim Safe Storage). The graded ASA in this document is in accordance with EDPI-4.30-01, Rev. 1, Safety Analysis Documentation, (BHI-DE-1) and is consistent with guidance provided by the U.S. Department of Energy. This ASA describes the hazards within the facility and evaluates the adequacy of the measures taken to reduce, control, or mitigate the identified hazards. This document also serves as the FHC for the Reactor/Steam Generator Zone Segment. This FHC is developed through the use of bounding accident analyses that envelope the potential exposures to personnel

  14. Interim storage study report

    Energy Technology Data Exchange (ETDEWEB)

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  15. The century storage facility. Why we have to give thoughts to the castor halls; Die Jahrhundert-Lager. Warum wir uns dringend Gedanken ueber die Castor-Hallen machen muessen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2017-01-15

    The authors discuss the situation of the German interim storage facilities for high-level nuclear waste. The Castor casks are supposed to be licensed as storage casks for 40 years. It is already foreseeable that after 40 years a final repository will not be available. This means that the Castor casks and the interim storage halls will have to be operated at least for the 21st century without valid licensing.

  16. Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-12-08

    The U. S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the

  17. Waste management system functional requirements for Interim Waste Management Facilities (IWMFs) and technology demonstrations, LLWDDD [Low-Level Disposal Development and Demonstration] Program

    International Nuclear Information System (INIS)

    1988-03-01

    The purpose of this report is to build upon the preceding decisions and body of information to prepare draft system functional requirements for each classification of waste disposal currently proposed for Low-Level Waste Disposal Development Demonstration (LLWDDD) projects. Functional requirements identify specific information and data needs necessary to satisfy engineering design criteria/objectives for Interim Waste Management Facilities. This draft will suppor the alternatives evaluation process and will continue to evolve as strategy is implemented, regulatory limits are established, technical and economic uncertainties are resolved, and waste management plans are being implemented. This document will become the planning basis for the new generation of solid LLW management facilities on new sites on the Reservation. Eighteen (18) general system requirements are identified which are applicable to all four Low-Level Waste (LLW) disposal classifications. Each classification of LLW disposal is individually addressed with respect ot waste characteristics, site considerations, facility operations, facility closure/post-closure, intruder barriers, institutional control, and performance monitoring requirements. Three initial LLW disposal sites have been proposed as locations on the ORR for the first demonstrations

  18. Verification of maximum impact force for interim storage cask for the Fast Flux Testing Facility

    International Nuclear Information System (INIS)

    Chen, W.W.; Chang, S.J.

    1996-01-01

    The objective of this paper is to perform an impact analysis of the Interim Storage Cask (ISC) of the Fast Flux Test Facility (FFTF) for a 4-ft end drop. The ISC is a concrete cask used to store spent nuclear fuels. The analysis is to justify the impact force calculated by General Atomics (General Atomics, 1994) using the ILMOD computer code. ILMOD determines the maximum force developed by the concrete crushing which occurs when the drop energy has been absorbed. The maximum force, multiplied by the dynamic load factor (DLF), was used to determine the maximum g-level on the cask during a 4-ft end drop accident onto the heavily reinforced FFTF Reactor Service Building's concrete surface. For the analysis, this surface was assumed to be unyielding and the cask absorbed all the drop energy. This conservative assumption simplified the modeling used to qualify the cask's structural integrity for this accident condition

  19. Waste Encapsulation and Storage Facility (WESF) Design Reconstitution Plan

    International Nuclear Information System (INIS)

    HERNANDEZ, R.

    1999-01-01

    The purpose of Design Reconstitution is to establish a Design Baseline appropriate to the current facility mission. The scope of this plan is to ensure that Systems, Structures and Components (SSC) identified in the WESF Basis for Interim Operation (HNF-SDWM-BIO-002) are adequately described and documented, in order to support facility operations. In addition the plan addresses the adequacy of selected Design Topics which are also crucial for support of the facility Basis for Interim Operation (BIO)

  20. Safety of laboratories, plants, facilities being dismantled, waste processing, interim storage and disposal facilities. Lessons learned from events reported in 2009 and 2010

    International Nuclear Information System (INIS)

    2013-01-01

    This report presents the cross-disciplinary analysis performed by IRSN relating to significant events reported to the French Nuclear Safety Authority (ASN) during 2009 - 2010 for LUDD-type facilities (laboratories, plants, facilities being dismantled, and waste processing, interim storage and disposal facilities). It constitutes a follow-up to DSU Report 215 published in December 2009, relating to events reported to ASN during 2005 to 2008. The main developments observed since the analysis presented in that report have been underlined here, in order to highlight improvements, opportunities for progress and the main areas requiring careful attention. The present report is a continuation of DSU Report 215. Without claiming to be exhaustive, it presents lessons from IRSN's cross-disciplinary analysis of events reported to ASN during 2009 and 2010 at LUDD facilities while highlighting major changes from the previous analysis in order to underline improvements, areas where progress has been made, and main points for monitoring. The report has four sections: - the first gives a brief introduction to the various kinds of LUDD facilities and highlights changes with DSU Report 215; - the second provides a summary of major trends involving events reported to ASN during 2007-2010 as well as overall results of consequences of events reported during 2009 and 2010 for workers, the general public and the environment; - the third section gives a cross-disciplinary analysis of significant events reported during 2009 and 2010, performed from two complementary angles (analysis of main types of events grouped by type of risk and analysis of generic causes). Main changes from the analysis given in DSU Report 215 are considered in detail; - the last section describes selected significant events that occurred in 2009 and 2010 in order to illustrate the cross-disciplinary analysis with concrete examples. IRSN will publish this type of report periodically in coming years in order to

  1. Plutonium uranium extraction (PUREX) end state basis for interim operation (BIO) for surveillance and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    DODD, E.N.

    1999-05-12

    This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following completion of the deactivation project. The deactivation project has removed or stabilized the hazardous materials within the facility structure and equipment to reduce the hazards posed by the facility during the surveillance and maintenance (S and M) period, and to reduce the costs associated with the S and M. This document serves as the authorization basis for the PUREX facility, excluding the storage tunnels, railroad cut, and associated tracks, for the deactivated end state condition during the S and M period. The storage tunnels, and associated systems and areas, are addressed in WHC-SD-HS-SAR-001, Rev. 1, PUREX Final Safety Analysis Report. During S and M, the mission of the facility is to maintain the conditions and equipment in a manner that ensures the safety of the workers, environment, and the public. The S and M phase will continue until the final decontamination and decommissioning (D and D) project and activities are begun. Based on the methodology of DOE-STD-1027-92, Hazards Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, the final facility hazards category is identified as hazards category This considers the remaining material inventories, form and distribution of the material, and the energies present to initiate events of concern. Given the current facility configuration, conditions, and authorized S and M activities, there are no operational events identified resulting in significant hazard to any of the target receptor groups (e.g., workers, public, environment). The only accident scenarios identified with consequences to the onsite co-located workers were based on external natural phenomena, specifically an earthquake. The dose consequences of these events are within the current risk evaluation guidelines and are consistent with the expectations for a hazards category 2

  2. Plutonium uranium extraction (PUREX) end state basis for interim operation (BIO) for surveillance and maintenance

    International Nuclear Information System (INIS)

    DODD, E.N.

    1999-01-01

    This Basis for Interim Operation (BIO) was developed for the PUREX end state condition following completion of the deactivation project. The deactivation project has removed or stabilized the hazardous materials within the facility structure and equipment to reduce the hazards posed by the facility during the surveillance and maintenance (S and M) period, and to reduce the costs associated with the S and M. This document serves as the authorization basis for the PUREX facility, excluding the storage tunnels, railroad cut, and associated tracks, for the deactivated end state condition during the S and M period. The storage tunnels, and associated systems and areas, are addressed in WHC-SD-HS-SAR-001, Rev. 1, PUREX Final Safety Analysis Report. During S and M, the mission of the facility is to maintain the conditions and equipment in a manner that ensures the safety of the workers, environment, and the public. The S and M phase will continue until the final decontamination and decommissioning (D and D) project and activities are begun. Based on the methodology of DOE-STD-1027-92, Hazards Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, the final facility hazards category is identified as hazards category This considers the remaining material inventories, form and distribution of the material, and the energies present to initiate events of concern. Given the current facility configuration, conditions, and authorized S and M activities, there are no operational events identified resulting in significant hazard to any of the target receptor groups (e.g., workers, public, environment). The only accident scenarios identified with consequences to the onsite co-located workers were based on external natural phenomena, specifically an earthquake. The dose consequences of these events are within the current risk evaluation guidelines and are consistent with the expectations for a hazards category 2

  3. 1984 Federal Interim Storage fee study: a technical and economic analysis

    International Nuclear Information System (INIS)

    Engel, R.L.

    1984-07-01

    JAI examined alternative methods for structuring charges for Federal Interim Storage (FIS) services were examined and the conclusion reached that the combined interests of the Department and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, and (4) impact aid payments made in accordance with section 136(e) of the Act. The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under-or over-estimation in the costs used to calculate the Initial Payment of the fee including savings due to rod consolidation), (2) module costs (i.e., storage casks, drywells, or silos), and (3) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at cost since these will be specific to each reactor site and destination

  4. Interim Storage of Plutonium in Existing Facilities

    International Nuclear Information System (INIS)

    Woodsmall, T.D.

    1999-01-01

    'In this era of nuclear weapons disarmament and nonproliferation treaties, among many problems being faced by the Department of Energy is the safe disposal of plutonium. There is a large stockpile of plutonium at the Rocky Flats Environmental Technology Center and it remains politically and environmentally strategic to relocate the inventory closer to a processing facility. Savannah River Site has been chosen as the final storage location, and the Actinide Packaging and Storage Facility (APSF) is currently under construction for this purpose. With the ability of APSF to receive Rocky Flats material an estimated ten years away, DOE has decided to use the existing reactor building in K-Area of SRS as temporary storage to accelerate the removal of plutonium from Rocky Flats. There are enormous cost savings to the government that serve as incentive to start this removal as soon as possible, and the KAMS project is scheduled to receive the first shipment of plutonium in January 2000. The reactor building in K-Area was chosen for its hardened structure and upgraded seismic qualification, both resulting from an effort to restart the reactor in 1991. The KAMS project has faced unique challenges from Authorization Basis and Safety Analysis perspectives. Although modifying a reactor building from a production facility to a storage shelter is not technically difficult, the nature of plutonium has caused design and safety analysis engineers to make certain that the design of systems, structures and components included will protect the public, SRS workers, and the environment. A basic overview of the KAMS project follows. Plutonium will be measured and loaded into DOT Type-B shipping packages at Rocky Flats. The packages are 35-gallon stainless steel drums with multiple internal containment boundaries. DOE transportation vehicles will be used to ship the drums to the KAMS facility at SRS. They will then be unloaded, stacked and stored in specific locations throughout the

  5. 1986 Federal Interim Storage fee study: a technical and economic analysis

    International Nuclear Information System (INIS)

    1986-09-01

    JAI examined alternative methods for structuring charges for federal interim storage (FIS) services and concluded that the combined interests of the Department and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with Section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under- or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination

  6. Repacking of Cobalt 60 spent sources in the central interim storage

    International Nuclear Information System (INIS)

    Zeleznik, N.

    2003-01-01

    After the transfer of the responsibility for the management of the Central interim storage for waste from small producers, located at the reactor centre in Brinje near Ljubljana, Slovenia, the national Agency for radwaste management (ARAO) started with most urgent activities to improve the utilization of the storage facility. One of the main tasks has also been the rearrangement of the already stored radioactive waste in order to reduce volume of the waste and to collect same radioisotopes in the containers. The latest campaign, performed in 2002/2003, was repacking of all Co-60 spent sealed sources in the storage facility and also at the producer's premises which were after conditioning put into two drums with concrete matrix and stored back to the Central interim storage. The preparation works together with the implementation are described in the paper. (author)

  7. Issues related to the licensing of final disposal facilities for radioactive waste

    International Nuclear Information System (INIS)

    Medici, M.A.; Alvarez, D.E.; Lee Gonzales, H.; Piumetti, E.H.; Palacios, E.

    2010-01-01

    The licensing process of a final disposal facility for radioactive waste involves the design, construction, pre-operation, operation, closure and post closure stages. While design and pre-operational stages are, to a reasonable extent, similar to other kind of nuclear or radioactive facilities, construction, operation, closure and post-closure of a radioactive waste disposal facility have unique meanings. As consequence of that, the licensing process should incorporate these particularities. Considering the long timeframes involved at each stage of a waste disposal facility, it is convenient that the development of the project being implemented in and step by step process, be flexible enough as to adapt to new requirements that would arise as a consequence of technology improvements or due to variations in the socio-economical and political conditions. In Argentina, the regulatory Standard AR 0.1.1 establishes the general guideline for the 'Licensing of Class I facilities (relevant facilities)'. Nevertheless, for radioactive waste final disposal facilities a new specific guidance should be developed in addition to the Basic Standard mentioned. This paper describes the particularities of final disposal facilities indicating that a specific licensing system for this type of facilities should be foreseen. (authors) [es

  8. Project management plan for Reactor 105-C Interim Safe Storage project

    International Nuclear Information System (INIS)

    Plagge, H.A.

    1996-09-01

    Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules

  9. Physical protection of shipments of irradiated reactor fuel; Interim guidance. Regulatory report

    International Nuclear Information System (INIS)

    1980-06-01

    During May, 1979, the U.S. Nuclear Regulatory Commission approved for issuance in effective form new interim regulations for strengthening the protection of spent fuel shipments against sabotage and diversion. The new regulations were issued without benefit of public comment, but comments from the public were solicited after the effective date. Based upon the public comments received, the interim regulations were amended and reissued in effective form as a final interim rule in May, 1980. The present document supersedes a previously issued interim guidance document, NUREG-0561 (June, 1979) which accompanied the original rule. This report has been revised to conform to the new interim regulations on the physical protection of shipments of irradiated reactor fuel which are likely to remain in effect until the completion of an ongoing research program concerning the response of spent fuel to certain forms of sabotage, at which time the regulations may be rescinded, modified or made permanent, as appropriate. This report discusses the amended regulations and provides a basis on which licensees can develop an acceptable interim program for the protection of spent fuel shipments

  10. Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Boing, L.E.; Aldana, J.

    1997-03-01

    The Final Report for the Decontamination and Decommissioning (D ampersand D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D ampersand D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D ampersand D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D ampersand D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a open-quotes Radiologically Controlled Area,close quotes noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion)

  11. Nuclear waste: Is there a need for federal interim storage

    International Nuclear Information System (INIS)

    1989-01-01

    The Congress created the Monitored Retrievable Storage Review Commission to provide a report on the need for a Federal monitored retrievable storage facility (MRS) as part of the Nation's nuclear waste management system. The Commission concludes that the MRS as presently described in the law, which links the capacity and schedule of operation of the MRS to a permanent geologic repository, cannot be justified. The Commission finds, however, that while no single factor would favor an MRS over the No-MRS option, cumulatively the advantages of an MRS would justify the building of an MRS if: there were no linkages between the MRS and the repository; the MRS could be constructed at an early date; and the opening of the repository were delayed considerably beyond its presently scheduled date of operation. The Commission therefore recommends that the Congress take the following actions: Authorize construction of a Federal Emergency Storage facility with a capacity limit of 2,000 metric tons of uranium; Authorize construction of a User-Funded Interim Storage facility with a capacity limit of 5,000 metric tons of uranium; Reconsider the subject of interim storage by the year 2000

  12. Spent Nuclear Fuel (SNF) Cold Vacuum Drying (CVD) Facility Operations Manual; FINAL

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1999-01-01

    This document provides the Operations Manual for the Cold Vacuum Drying Facility (CVDF). The Manual was developed in conjunction with HNF-553, Spent Nuclear Fuel Project Final Safety Analysis Report Annex B-Cold Vacuum Drying Facility. The HNF-SD-SNF-DRD-002, 1999, Cold Vacuum Drying Facility Design Requirements, Rev. 4, and the CVDF Final Design Report. The Operations Manual contains general descriptions of all the process, safety and facility systems in the CVDF, a general CVD operations sequence and references to the CVDF System Design Descriptions (SDDs). This manual has been developed for the SNFP Operations Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  13. Safety aspects of long-term dry interim storage of type-B spent fuel and HLW transport casks

    International Nuclear Information System (INIS)

    Wolff, D.; Probst, U.; Voelzke, H.; Droste, B.; Roedel, R.

    2004-01-01

    Based on the German decision to minimise transports of spent fuel casks between nuclear power plants, reprocessing plants and central storage facilities several on-site storage facilities have been licensed till the end of 2003. Because of the large amount of type-B transport casks which are going to be used for long-term interim storage the question of time limited type-B license maintenance during the storage period of up to 40 years has been discussed under different aspects. This paper describes present technical aspects of the discussion. A main aspect of transport cask qualification for interim storage is the long-term behaviour of the metallic seal lid system. Concerning this results from current experimental long-term tests with metallic ''Helicoflex''-seals in which pool water is enclosed are presented. The test series has been performed by the Federal Institute for Materials Research and Testing (BAM) on behalf of the Federal Office for Radiation Protection (BfS) since 2001. Finally, the paper presents a German concept for an authorities' and technical experts' exchange of experience, know-how and state of the art referring to cask dispatch in nuclear facilities. BAM has taken over a central role in this so-called ''co-ordinating institution for cask dispatching information'' (''KOBAF'') which contains an online data base and a technical working group meeting twice a year. The goal is to keep comparable technical standards for all nuclear sites and storage facilities which are going to load and dispatch casks of the same or similar types under the responsibility of different German state governments for the next decades

  14. A comparison of the value relevance of interim and annual financial statements

    Directory of Open Access Journals (Sweden)

    Mbalenhle Zulu

    2017-03-01

    Aim: It explores whether the value relevance of interim financial statements is higher than the value relevance of annual financial statements. Finally, it investigates whether accounting information published in interim and annual financial statements has incremental value relevance. Setting: Data for the period from 1999 to 2012 were collected from a sample of non-financial companies listed on the Johannesburg Stock Exchange. Method: The Ohlson model to investigate the value relevance of accounting information was used for the study. Results: The results show that interim book value of equity is value relevant while interim earnings are not. Interim financial statements appear to have higher value relevance than annual financial statements. The value relevance of interim and annual accounting information has remained fairly constant over the sample period. Incremental comparisons provide evidence that additional book value of equity and earnings that accrue to a company between interim and annual reporting dates are value relevant. Conclusion: The study was conducted over a long sample period (1999–2012, in an era when a technology-driven economy and more timely reporting media could have had an effect on the value relevance of published accounting information. To the best of our knowledge, this is the first study to evaluate and compare the value relevance of published interim and annual financial statements.

  15. An analysis of heating, ventilation and air conditioning system for nuclear facilities

    International Nuclear Information System (INIS)

    Park, Hyun Soo; Kim, Byung Tae; Park, Seong Won; Cho, Soo Haeng; Lee, Yong Rae; Lee, Kyung Ku; Park, Seung Hyub; Hwang, Jeong Ki; Kim, Jeong Mook; Oh, Haeng Yoeb

    1988-12-01

    An analysis of HVAC system was made on various nuclear facilities such as the existing nuclear power plants in Korea, Post Irradiation Examination Facility at KAERI and Midwest Fuel Recovery Plant in USA, to get basic data and information for the design of the spent fuel interim storage facility to be implemented as one of the radwaste management projects. With the results of this study, the HVAC system to be applied to the spent fuel interim storage facility was selected and the major design considerations of the facility were suggested. (Author)

  16. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  17. The challenges facing the long term interim storage

    Energy Technology Data Exchange (ETDEWEB)

    Iracane, D. [CEA Sacaly, Dir. de la Simulation et des Outils Experimentaux-DSOE, 91 - Gif sur Yvette (France); Marvy, A. [CEA Saclay, Dir. du Developpement et de l' Innovation Nucleares-DDIN, 91 - Gif Sur Yvette (France)

    2001-07-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  18. The challenges facing the long term interim storage

    International Nuclear Information System (INIS)

    Iracane, D.; Marvy, A.

    2001-01-01

    In France electricity generation by means of commercial nuclear power plants has come to a point where it contributes to the national demand at a level of 80%. The safety performance of the production system has also reached a high level of both maturity and reliability taking advantage of the cumulative effect of a 30 years long learning experience and ever more stringent safety requirements. The policy to reprocess spent fuel has been overriding but no final decision has yet been made regarding the ultimate disposition of the waste streams. Although studies on deep geological disposal are ongoing, France is also looking at whether and under which conditions a long-term interim storage may provide an effective flexibility to the fuel cycle back-end. We discuss thereafter the needs and the paramount objectives of this latter R and D program. Results are being framed as potential guiding criteria for decision makers and various stakeholders. In first part, we propose a general analysis which emphasises that a long term interim storage is more than a classical nuclear facility because it explicitly requires long-lasting control and creates a burden for Society during many generations. Then, in second part, we offer an overview of the technical results from the R and D program as they stand at the time of writing. As an answer to the Government request, a strong emphasis has been put on this research for three years. Conclusion is an attempt to outline the societal context in which future decisions will have to be made. (author)

  19. Final Design Report for the RH LLW Disposal Facility (RDF) Project, Revision 3

    International Nuclear Information System (INIS)

    Austad, Stephanie Lee

    2015-01-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  20. Scheme of higher-density storage of spent nuclear fuel in Chernobyl NPP interim storage facility no. 1

    International Nuclear Information System (INIS)

    Britan, P.M.

    2008-01-01

    On 29. March 2000 the Cabinet of Ministers of Ukraine issued a decree prescribing that the last operating unit of Chernobyl NPP be shut down before its design lifetime expiry. In accordance with the Contract concluded on 14 June 1999 between the National Energy-generating Company 'Energoatom' and the Consortium of Framatome, Campenon Bernard-SGE and Bouygues, in order to store the spent ChNPP fuel a new interim dry storage facility (ISF-2) for spent ChNPP fuel would be built. Currently the spent nuclear fuel (spent fuel assemblies - SFAs) is stored in reactor cooling pools and in the reactors on Units 1, 2, 3, as well as in the wet Interim Storage Facility (ISF-1). Taking into account the expected delay with the commissioning of ISF-2, and in connection with the scheduled activities to build the New Safe Confinement (including the taking-down of the existing ventilation stack of ChNPP Units 3 and 4) and the expiry of the design operation life of Units 1 and 2, it is expedient to remove the nuclear fuel from Units 1, 2 and 3. This is essential to improve nuclear safety and ensure that the schedule of construction of the New Safe Confinement is met. The design capacity of ISF-1 (17 800 SFAs) is insufficient to store all SFAs (21 284) currently on ChNPP. A technically feasible option that has been applied on other RBMK plants is denser storage of spent nuclear fuel in the cooling ponds of the existing ISF-1. The purpose of the proposed modifications is to introduce changes to the ISF-1 design supported by necessary justifications required by the Ukrainian codes with the objective of enabling the storage of additional SFAs in the existing storage space (cooling pools). The need for the modification is caused by the requirement to remove nuclear fuel from the ChNPP units as soon as possible, before the work begins to decommission these units, as well as to create safe conditions for the construction of the New Safe Confinement over the existing Shelter Unit. (author)

  1. Design, construction and commissioning of an interim spent fuel store for the decommissioning of Ignalina NPP, Lithuania

    International Nuclear Information System (INIS)

    Rainer Goehring; Martin Beverungen; Phil Smith

    2006-01-01

    The contract for the design, construction and commissioning (turn-key) of an interim spent fuel store facility (ISFSF) has been awarded to a Consortium of GNS Gesellschaft fuer Nuklear Service and RWE NUKEM GmbH under the lead of RWE NUKEM. The contract was signed on the 12.01.2005. The Interim Spent Fuel Storage Facility (ISFSF) is financed by the Ignalina Decommissioning Support Fund which is managed by EBRD. All spent fuel assemblies, currently stored in the spent fuel pits at the reactors plus future arising (about 18000 in total) will be loaded in the CONSTOR R RBMK1500/M2 containers, which are stored in the new facility. The initial contract has been awarded for 3500 spent fuel assemblies. (authors)

  2. Interim data report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Vahlund, Fredrik; Andersson, Johan

    2004-08-01

    This document is the interim data report in the project SR-Can. The purpose of the data report is to present input data, with uncertainty estimates, for the SR-Can assessment calculations. Besides input data, the report also describes the standardised procedures used when deriving the input data and the corresponding uncertainty estimates. However, in the present interim version of the report (written in the initial stage of the project when site characterisation has yet not been completed) the standardised procedures have not been possible to apply for most of the data and, in order to present a compilation of the data used in the assessment, much of the input data is presented without following the standardised procedures. This will however be changed for the final version of the SR-Can data report, in order to show the methodology that will be used in the final version one example of how input data will be presented is included (migration data for buffer) . The recommended input data for the assessment calculations are, for the interim version, mainly based on SR 97 Beberg data, these are merely presented without any background or uncertainty discussion (this is presented in the SR 97 data report)

  3. Safety aspects of long-term dry interim storage of Type B spent fuel and high-level transport casks

    International Nuclear Information System (INIS)

    Wolff, D.; Probst, U.; Voelzke, H.; Droste, B.; Roedel, R.

    2004-01-01

    Based on the German decision to minimise transport of spent fuel casks between nuclear power plants, reprocessing plants and central storage facilities several on-site storage facilities were licensed until the end of 2003. Because of the large amount of Type B(U) transport casks which are going to be used for long-term interim storage the question of time-limited Type B(U) licence maintenance during the storage period of up to 40 years has been discussed under different aspects. This paper describes present technical aspects of the discussion. A main aspect of qualification of transport casks for interim storage is the long-term behaviour of the metallic seal-lid system. Here we present results from current long-term experimental tests with metallic 'Helicoflex' seals in which pool water is enclosed. This series of tests has been performed by the Federal Institute for Materials Research and Testing (BAM) on behalf of the Federal Office for Radiation Protection (BfS) since 2001. Finally, the paper presents a German concept for an exchange of experience, know-how and state-of-the-art between authorities and technical experts with regard to cask dispatch in nuclear facilities. BAM has taken over a central role in this so-called 'coordinating institution for cask dispatching information' ('KOBAF') which entails management of an online database of cask-specific documents and a technical working group meeting twice a year. The goal is to keep comparable technical standards for all nuclear sites and storage facilities which are going to load and dispatch casks of the same or similar types under the responsibility of different German state governments for the coming decades. (author)

  4. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  5. International long-term interim storage for spent fuel. An independent storage service investor model

    International Nuclear Information System (INIS)

    Leister, P.

    1999-01-01

    Thinking globally the obvious world-wide demands for large storage capacities for spent fuel within the next decades and the newly arising demands for long-term interim storage of spent fuel urges to respond by international interim storage facilities of high capacity. Low cost storage can be achieved only by arranging the storage facility underground in a suitable host rock formation and by selecting the geographical are by an international competition under those countries, who are willing to offer their land. The investor and operator of an international storage facility selected and realised by a competition on the free market as well as the country where the storage is built are both bound by two different kinds of contacts. The main contract is between the offering country/region and the independent operator. The independent operator has in addition a series of contracts with various utilities, which are interested to have their spent fuel stored for a longer period

  6. Glass packages in interim storage; Les verres dans les stockages

    Energy Technology Data Exchange (ETDEWEB)

    Jacquet-Francillon, N

    1994-10-01

    This report summarize the current state of knowledge concerning the behavior of type C waste packages consisting of vitrified high-level solutions produced by reprocessing spent fuel. The composition and the physical and chemical properties of the feed solutions are reviewed, and the vitrification process is described. Sodium alumino-borosilicate glass compositions are generally employed - the glass used at la Hague for LWR fuel solutions, for example, contains 45 % SiO{sub 2}. The major physical, chemical, mechanical and thermal properties of the glass are reviewed. In order to allow their thermal power to diminish, the 3630 glass packages produced (as of January 1993) in the vitrification facilities at Marcoule and La Hague are placed in interim storage for several decades. The actual interim storage period has not been defined, as it is closely related to the concept and organization selected for the final destination of the packages: a geological repository. The glass behavior under irradiation is described. Considerable basic and applied research has been conducted to assess the aqueous leaching behavior of nuclear containment glass. The effects of various repository parameters (temperature, flow rate, nature of the environmental materials) have been investigated. The experimental findings have been used to specify a model describing the kinetics of aqueous corrosion of the glass. More generally all the ``source term`` models developed in France by the CEA or by ANDRA are summarized. (author). 152 refs., 33 figs.

  7. Damaged Spent Nuclear Fuel at U.S. DOE Facilities Experience and Lessons Learned

    International Nuclear Information System (INIS)

    Brett W. Carlsen; Eric Woolstenhulme; Roger McCormack

    2005-01-01

    From a handling perspective, any spent nuclear fuel (SNF) that has lost its original technical and functional design capabilities with regard to handling and confinement can be considered as damaged. Some SNF was damaged as a result of experimental activities and destructive examinations; incidents during packaging, handling, and transportation; or degradation that has occurred during storage. Some SNF was mechanically destroyed to protect proprietary SNF designs. Examples of damage to the SNF include failed cladding, failed fuel meat, sectioned test specimens, partially reprocessed SNFs, over-heated elements, dismantled assemblies, and assemblies with lifting fixtures removed. In spite of the challenges involved with handling and storage of damaged SNF, the SNF has been safely handled and stored for many years at DOE storage facilities. This report summarizes a variety of challenges encountered at DOE facilities during interim storage and handling operations along with strategies and solutions that are planned or were implemented to ameliorate those challenges. A discussion of proposed paths forward for moving damaged and nondamaged SNF from interim storage to final disposition in the geologic repository is also presented

  8. Central waste complex interim safety basis

    International Nuclear Information System (INIS)

    Cain, F.G.

    1995-01-01

    This interim safety basis provides the necessary information to conclude that hazards at the Central Waste Complex are controlled and that current and planned activities at the CWC can be conducted safely. CWC is a multi-facility complex within the Solid Waste Management Complex that receives and stores most of the solid wastes generated and received at the Hanford Site. The solid wastes that will be handled at CWC include both currently stored and newly generated low-level waste, low-level mixed waste, contact-handled transuranic, and contact-handled TRU mixed waste

  9. Application of NUREG/CR-5999 interim fatigue curves to selected nuclear power plant components

    International Nuclear Information System (INIS)

    Ware, A.G.; Morton, D.K.; Nitzel, M.E.

    1995-03-01

    Recent test data indicate that the effects of the light water reactor (LWR) environment could significantly reduce the fatigue resistance of materials used in the reactor coolant pressure boundary components of operating nuclear power plants. Argonne National Laboratory has developed interim fatigue curves based on test data simulating LWR conditions, and published them in NUREG/CR-5999. In order to assess the significance of these interim fatigue curves, fatigue evaluations of a sample of the components in the reactor coolant pressure boundary of LWRs were performed. The sample consists of components from facilities designed by each of the four U.S. nuclear steam supply system vendors. For each facility, six locations were studied, including two locations on the reactor pressure vessel. In addition, there are older vintage plants where components of the reactor coolant pressure boundary were designed to codes that did not require an explicit fatigue analysis of the components. In order to assess the fatigue resistance of the older vintage plants, an evaluation was also conducted on selected components of three of these plants. This report discusses the insights gained from the application of the interim fatigue curves to components of seven operating nuclear power plants

  10. Advantages on dry interim storage for spent nuclear fuel

    International Nuclear Information System (INIS)

    Romanato, L.S.; Rzyski, B.M.

    2006-01-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  11. Advantages on dry interim storage for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Romanato, L.S. [Centro Tecnologico da Marinha em Sao Paulo, Av. Professor Lineu Prestes 2468, 05508-900 Sao Paulo (Brazil); Rzyski, B.M. [IPEN/ CNEN-SP, 05508-000 Sao Paulo (Brazil)]. e-mail: romanato@ctmsp.mar.mil.br

    2006-07-01

    When the nuclear fuel lose its ability to efficiently create energy it is removed from the core reactor and moved to a storage unit waiting for a final destination. Generally, the spent nuclear fuel (SNF) remains inside concrete basins with water within the reactors facility for the radioactive activity decay. Water cools the generated heat and shields radioactivity emissions. After some period of time in water basins the SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing installations, or still wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet installations, depending on the method adopted by the nuclear power plant or other plans of the country. In many SNF wet storage sites the capacity can be fulfilled very quickly. If so, additional area or other alternative storage system should be given. There are many options to provide capacity increase in the wet storage area, but dry storages are worldwide preferred since it reduces corrosion concerns. In the wet storage the temperature and water purity should be constantly controlled whereas in the dry storage the SNF stands protected in specially designed canisters. Dry interim storages are practical and approved in many countries especially that have the 'wait and see' philosophy (wait to see new technologies development). This paper shows the advantages of dry interim storages sites in comparison with the wet ones and the nowadays problems as terrorism. (Author)

  12. Federal Interim Storage program

    International Nuclear Information System (INIS)

    Johnson, E.R.; McBride, J.A.

    1984-01-01

    The DOE has developed a program for providing Federal Interim Storage servies for spent nuclear fuel which complies with the requirements of the Nuclear Waste Policy Act of 1982. Although very little constructive activity in providing storage facilities can be undertaken by DOE until fuel has been certified by NRC as eligible for FIS, DOE planning and background information is such as to provide reasonable assurance that its obligations can be fulfilled when the required certifications have been issued. A fee structure providing fuel recovery of all costs associated with the FIS program, as required by the Act, has been developed. It provides for an equitable distribution of costs among users, based on the quantity of fuel requiring storage

  13. Safety Consideration for a Wet Interim Spent Fuel Store at Conceptual Design Stage

    International Nuclear Information System (INIS)

    Astoux, Marion

    2014-01-01

    EDF Energy plans to build and operate two UK EPRs at the Hinkley Point C (HPC) site in Somerset, England. Spent fuel from the UK EPRs will need to be managed from the time it is discharged from the reactor until it is ultimately disposed of and this will involve storing the spent fuel for a period in the fuel building and thereafter in a dedicated interim facility until it can be emplaced within the UK Geological Disposal Facility. EDF Energy has proposed that this interim store should be located on the Hinkley Point site which is consistent with UK policy. This Interim Spent Fuel Store (ISFS) will have the capability to store for at least one hundred years the spent fuel arising from the operation of the two EPR units (sixty years operation). Therefore, specificities regarding the lifetime of the facility have to be accounted for its design. The choice of interim storage technology was considered in some depth for the HPC project and wet storage (pool) was selected. The facility is currently at conceptual design stage, although its construction will be part of main site construction phase. Safety functions and safety requirements for this storage facility have been defined, in compliance with WENRA 'Waste and Spent Fuel Storage - Safety Reference Level Report' and IAEA Specific Safety Guide no. 15 'Storage of Spent Nuclear Fuel'. EDF technical know-how, operational feedback on existing storage pools, UK regulatory context and Fukushima experience feedback have also been accounted for. Achievement of the safety functions as passively as reasonably practicable is a key issue for the design, especially in accident situations. Regarding lifetime aspects, ageing management of equipments, optimisation of the refurbishment, climate change, passivity of the facility, and long-term achievement of the safety functions are among the subjects to consider. Adequate Operational Limits and Conditions will also have to be defined, to enable the long-term achievement of the safety

  14. Interim storage packagings for spent fuels : how to optimize an universal design to local needs

    International Nuclear Information System (INIS)

    Konirsch, O.; Kawabata, T.; Hunter, I.

    2003-01-01

    For the last ten years, the interim storage market for spent fuels issued from Nuclear Power Plants has significantly increased all over the world: there are presently many storage projects either in Asia, in North America and in Europe. Even if there is no international regulation on that field, there is a big concern from all the nuclear industry to try to harmonise the specification for the definition of the Interim Storage Systems. One example of this harmonisation is the common and general wish to develop systems, which allow to be easily transportable either to a final repository or to a reprocessing plant. As this destination is generally not yet known, the storage system should be able to be transported all over the world. On the other hand, the specific requirement for the storage facility and its associated equipment are subject to local and/or national regulation. COGEMA LOGISTICS Group has developed two different technologies which are compatible with this principle of harmonisation: dual purpose metallic cask represented by the TN24 family and the concrete storage system NUHOMS(R). For both technologies, basic designs can be adapted to the local needs in term of performance and of national regulation. To cover all the world, COGEMA LOGISTICS Group has its own subsidiaries, in Asia, in North America and in Europe with their own autonomous engineers teams for designing, licensing, manufacturing and delivering the transport/storage products. COGEMA LOGISTICS Group is presently the leader on the dry interim storage market. The purpose of the present paper is to show how it is possible to optimise a basic existing design of a dual purpose metallic cask for a local need of storage. Taking into account the national rules for storage and the international regulation for transport, the designer shall minimise the development cost for a completely new design and maximise the capacity of the packaging regarding the allowable limits in the Nuclear Power Plant, in

  15. On the pathway towards disposal. The need for long-term interim storage of high-level nuclear waste

    International Nuclear Information System (INIS)

    Budelmann, Harald; Koehnke, Dennis; Reichardt, Manuel

    2017-01-01

    The disposal of spent nuclear fuel is a still unsolved problem with social, ethical, economical, ecological and political dimensions. The stagnating decision process on the final repository concept in several countries has the consequence of the inclusion of long-term interim storage into the disposal concept. The contribution discusses several approaches. This opens the question whether the long-term interim storage is a matter of delaying tactic or a pragmatic solution on the way to a final repository.

  16. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    Science.gov (United States)

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  17. Used Fuel Logistics: Decades of Experience with transportation and Interim storage solutions

    Energy Technology Data Exchange (ETDEWEB)

    Orban, G.; Shelton, C.

    2015-07-01

    Used fuel inventories are growing worldwide. While some countries have opted for a closed cycle with recycling, numerous countries must expand their interim storage solutions as implementation of permanent repositories is taking more time than foreseen. In both cases transportation capabilities will have to be developed. AREVA TN has an unparalleled expertise with transportation of used fuel. For more than 50 years AREVA TN has safely shipped more than 7,000 used fuel transport casks. The transportation model that was initially developed in the 1970s has been adapted and enhanced over the years to meet more restrictive regulatory requirements and evolving customer needs, and to address public concerns. The numerous “lessons learned” have offered data and guidance that have allowed for also efficient and consistent improvement over the decades. AREVA TN has also an extensive experience with interim dry storage solutions in many countries on-site but also is working with partners to developed consolidated interim storage facility. Both expertise with storage and transportation contribute to safe, secure and smooth continuity of the operations. This paper will describe decades of experience with a very successful transportation program as well as interim storage solutions. (Author)

  18. CNAEM waste processing and storage facility

    International Nuclear Information System (INIS)

    Osmanlioglu, A.E.; Kahraman, A.; Altunkaya, M.

    1998-01-01

    Radioactive waste in Turkey is generated from various applications. Radioactive waste management activities are carried out in a facility at Cekmece Nuclear Research and Training Center (CNAEM). This facility has been assigned to take all low-level radioactive wastes generated by nuclear applications in Turkey. The wastes are generated from research and nuclear applications mainly in medicine, biology, agriculture, quality control in metal processing and construction industries. These wastes are classified as low- level radioactive wastes and their activities are up to 10 -3 Ci/m 3 (except spent sealed sources). Chemical treatment and cementation of liquid radwaste, segregation and compaction of solid wastes and conditioning of spent sources are the main processing activities of this facility. A.so, analyses, registration, quality control and interim storage of conditioned low-level wastes are the other related activities of this facility. Conditioned wastes are stored in an interim storage building. All waste management activities, which have been carried out in CNAEM, are generally described in this paper. (author)

  19. Hanford environment as related to radioactive waste burial grounds and transuranium waste storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Brown, D.J.; Isaacson, R.E.

    1977-06-01

    A detailed characterization of the existing environment at Hanford was provided by the U.S. Energy Research and Development Administration (ERDA) in the Final Environmental Statement, Waste Management Operations, Hanford Reservation, Richland, Washington, December 1975. Abbreviated discussions from that document are presented together with current data, as they pertain to radioactive waste burial grounds and interim transuranic (TRU) waste storage facilities. The discussions and data are presented in sections on geology, hydrology, ecology, and natural phenomena. (JRD)

  20. Hanford environment as related to radioactive waste burial grounds and transuranium waste storage facilities

    International Nuclear Information System (INIS)

    Brown, D.J.; Isaacson, R.E.

    1977-06-01

    A detailed characterization of the existing environment at Hanford was provided by the U.S. Energy Research and Development Administration (ERDA) in the Final Environmental Statement, Waste Management Operations, Hanford Reservation, Richland, Washington, December 1975. Abbreviated discussions from that document are presented together with current data, as they pertain to radioactive waste burial grounds and interim transuranic (TRU) waste storage facilities. The discussions and data are presented in sections on geology, hydrology, ecology, and natural phenomena

  1. Interim safety evaluation report related to operation of Enrico Fermi Atomic Power Plant, Unit 2, Detroit Edison Company

    International Nuclear Information System (INIS)

    1977-09-01

    This interim report summarizes the scope and results of the radiological safety review performed to date by the NRC staff with respect to the operating license phase for the Enrico Fermi Atomic Power Plant, Unit 2. The major effort was the review of the facility design and proposed operating procedures described in applicant's Final Safety Analysis Report. In the course of the review, several meetings were held with representatives of the applicant to discuss plant design, construction and proposed operation. Additional information was requested, which the applicant provided through Amendment 7 to the Final Safety Analysis Report. A chronology of the principal actions relating to the review of the application is attached as Appendix A to the report. The Final Safety Analysis Report and amendments thereto are available for public inspection at the Nuclear Regulatory Commission Public Document Room, 1717 H Street, N. W., Washington, D.C. and at Monroe County Library System, 3700 South Custer Road, Monroe, Michigan 48161

  2. Development of a probabilistic safety assessment framework for an interim dry storage facility subjected to an aircraft crash using best-estimate structural analysis

    International Nuclear Information System (INIS)

    Almomani, Belal; Jang, Dong Chan; Lee, Sang Hoon; Kang, Hyun Gook

    2017-01-01

    Using a probabilistic safety assessment, a risk evaluation framework for an aircraft crash into an interim spent fuel storage facility is presented. Damage evaluation of a detailed generic cask model in a simplified building structure under an aircraft impact is discussed through a numerical structural analysis and an analytical fragility assessment. Sequences of the impact scenario are shown in a developed event tree, with uncertainties considered in the impact analysis and failure probabilities calculated. To evaluate the influence of parameters relevant to design safety, risks are estimated for three specification levels of cask and storage facility structures. The proposed assessment procedure includes the determination of the loading parameters, reference impact scenario, structural response analyses of facility walls, cask containment, and fuel assemblies, and a radiological consequence analysis with dose–risk estimation. The risk results for the proposed scenario in this study are expected to be small relative to those of design basis accidents for best-estimated conservative values. The importance of this framework is seen in its flexibility to evaluate the capability of the facility to withstand an aircraft impact and in its ability to anticipate potential realistic risks; the framework also provides insight into epistemic uncertainty in the available data and into the sensitivity of the design parameters for future research

  3. Development of a Probabilistic Safety Assessment Framework for an Interim Dry Storage Facility Subjected to an Aircraft Crash Using Best-Estimate Structural Analysis

    Directory of Open Access Journals (Sweden)

    Belal Almomani

    2017-03-01

    Full Text Available Using a probabilistic safety assessment, a risk evaluation framework for an aircraft crash into an interim spent fuel storage facility is presented. Damage evaluation of a detailed generic cask model in a simplified building structure under an aircraft impact is discussed through a numerical structural analysis and an analytical fragility assessment. Sequences of the impact scenario are shown in a developed event tree, with uncertainties considered in the impact analysis and failure probabilities calculated. To evaluate the influence of parameters relevant to design safety, risks are estimated for three specification levels of cask and storage facility structures. The proposed assessment procedure includes the determination of the loading parameters, reference impact scenario, structural response analyses of facility walls, cask containment, and fuel assemblies, and a radiological consequence analysis with dose–risk estimation. The risk results for the proposed scenario in this study are expected to be small relative to those of design basis accidents for best-estimated conservative values. The importance of this framework is seen in its flexibility to evaluate the capability of the facility to withstand an aircraft impact and in its ability to anticipate potential realistic risks; the framework also provides insight into epistemic uncertainty in the available data and into the sensitivity of the design parameters for future research.

  4. Development of a probabilistic safety assessment framework for an interim dry storage facility subjected to an aircraft crash using best-estimate structural analysis

    Energy Technology Data Exchange (ETDEWEB)

    Almomani, Belal; Jang, Dong Chan [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Lee, Sang Hoon [Dept. of Mechanical and Automotive Engineering, Keimyung University, Daegu (Korea, Republic of); Kang, Hyun Gook [Dept. of Mechanical, Aerospace and Nuclear Engineering, Rensselaer Polytechnic Institute, Troy (United States)

    2017-03-15

    Using a probabilistic safety assessment, a risk evaluation framework for an aircraft crash into an interim spent fuel storage facility is presented. Damage evaluation of a detailed generic cask model in a simplified building structure under an aircraft impact is discussed through a numerical structural analysis and an analytical fragility assessment. Sequences of the impact scenario are shown in a developed event tree, with uncertainties considered in the impact analysis and failure probabilities calculated. To evaluate the influence of parameters relevant to design safety, risks are estimated for three specification levels of cask and storage facility structures. The proposed assessment procedure includes the determination of the loading parameters, reference impact scenario, structural response analyses of facility walls, cask containment, and fuel assemblies, and a radiological consequence analysis with dose–risk estimation. The risk results for the proposed scenario in this study are expected to be small relative to those of design basis accidents for best-estimated conservative values. The importance of this framework is seen in its flexibility to evaluate the capability of the facility to withstand an aircraft impact and in its ability to anticipate potential realistic risks; the framework also provides insight into epistemic uncertainty in the available data and into the sensitivity of the design parameters for future research.

  5. Interim process report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Sellin, Patrick

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses

  6. Interim process report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Sellin, Patrick (ed.)

    2004-08-01

    This report is a documentation of buffer processes identified as relevant to the long-term safety of a KBS-3 repository. The report is part of the interim reporting of the safety assessment SR-Can, see further the Interim main report. The final SR-Can reporting will support SKB's application to build an Encapsulation plant for spent nuclear fuel and is to be produced in 2006. The purpose of this report is to document the scientific knowledge of the processes to a level required for an adequate treatment in the safety assessment. The documentation is thus from a scientific point of not exhaustive since such a treatment is neither necessary for the purposes of the safety assessment nor possible within the scope of an assessment. The purpose is further to determine the handling of each process in the safety assessment and to demonstrate how uncertainties are taken care of, given the suggested handling. The process documentation in the SR 97 version of the Process report is a starting point for this SR-Can interim version. As further described in the Interim main report, the list of relevant processes has been reviewed and slightly extended by comparison to other databases. Furthermore, the backfill has been included as a system part of its own, rather than being described together with the buffer as in SR 97. Apart from giving an interim account of the documentation and handling of buffer processes in SR-Can, this report is meant to serve as a template for the forthcoming documentation of processes occurring in other parts of the repository system. A complete list of processes can be found in the Interim FEP report for the safety assessment SR-Can. All material presented in this document is preliminary in nature and will possibly be updated as the SR-Can project progresses.

  7. Imaging the risks - risking the image: Social impact assessment of the final disposal facility

    International Nuclear Information System (INIS)

    Avolahti, J.; Vira, J.

    1999-01-01

    Preparations for the final disposal of spent nuclear fuel in Finland started about twenty years ago. At present the work is carried out by Posiva Oy, which in 1996 took over the programme managed earlier by Teollisuuden Voima Oy, one of the country's nuclear power companies. From 1996 on the preparations have been made for all the spent fuel from Finnish nuclear power stations. The site for the final disposal facility will be selected among four alternatives by the end of 2000 and - assuming that the technical approach proposed by Posiva is accepted by the Government and the Parliament - the construction of the repository will start in the 2010s. The disposal operations are planned to be started in 2020. The alternative four sites have gone through a systematic site selection process based on geologic siting criteria and on environmental and cultural considerations. One of the objectives of the process was to avoid inhabited areas, agricultural fields, valuable groundwater or preservation areas as well as areas which might draw interest as regards the potential for ore deposits. The idea was that the field investigations and later the possible disposal facility should not cause any harm to local people. Two of the candidate sites are at present nuclear power plant sites situated at the coast, the two other candidates are inland sites with no nuclear activities. The geologic siting investigations were started in 1987. Interim assessments of the results so far have been made in 1992 and 1996 and a final report of all the investigations will be published before the end of 2000. The present view is that all four candidates are geologically suitable for siting the repository. Posiva's EIA for the final disposal of spent fuel in Finland is nearing completion. A considerable effort was made to involve local groups and individuals in the assessment process. Yet the participation remained limited and consisted mainly of active opponents of the project and of those who were

  8. Imaging the risks - risking the image: Social impact assessment of the final disposal facility

    Energy Technology Data Exchange (ETDEWEB)

    Avolahti, J.; Vira, J. [Posiva Oy, Helsinki (Finland)

    1999-12-01

    Preparations for the final disposal of spent nuclear fuel in Finland started about twenty years ago. At present the work is carried out by Posiva Oy, which in 1996 took over the programme managed earlier by Teollisuuden Voima Oy, one of the country's nuclear power companies. From 1996 on the preparations have been made for all the spent fuel from Finnish nuclear power stations. The site for the final disposal facility will be selected among four alternatives by the end of 2000 and - assuming that the technical approach proposed by Posiva is accepted by the Government and the Parliament - the construction of the repository will start in the 2010s. The disposal operations are planned to be started in 2020. The alternative four sites have gone through a systematic site selection process based on geologic siting criteria and on environmental and cultural considerations. One of the objectives of the process was to avoid inhabited areas, agricultural fields, valuable groundwater or preservation areas as well as areas which might draw interest as regards the potential for ore deposits. The idea was that the field investigations and later the possible disposal facility should not cause any harm to local people. Two of the candidate sites are at present nuclear power plant sites situated at the coast, the two other candidates are inland sites with no nuclear activities. The geologic siting investigations were started in 1987. Interim assessments of the results so far have been made in 1992 and 1996 and a final report of all the investigations will be published before the end of 2000. The present view is that all four candidates are geologically suitable for siting the repository. Posiva's EIA for the final disposal of spent fuel in Finland is nearing completion. A considerable effort was made to involve local groups and individuals in the assessment process. Yet the participation remained limited and consisted mainly of active opponents of the project and of those

  9. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    Hauer, K.A.; Wilson, J.F.

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  10. Final decommissioning report for the 183-C Filter Building/Pumproom facility

    International Nuclear Information System (INIS)

    Marske, S.G.

    1997-04-01

    This report documents the decommissioning and demolition (D ampersand D) of the 183-C Filter Building/Pumproom facility (located at the Hanford Site in Richland, Washington). The 183-C Facility D ampersand D involved the performance of characterization to support the development of a project plan and final hazard classification

  11. Conceptual design of interim storage facility for CNAI

    International Nuclear Information System (INIS)

    Fuenzalida Troyano, Carlos S.; Bergallo, Juan E.; Nassini, Horacio E.P.; Blanco, Anibal; Delmastro, Dario F.

    2007-01-01

    The reduced storage capacity available in the two spent fuel pools of argentine PHWR Atucha-1 power plant, the current plans for extending the reactor operation beyond its design lifetime, and the government decision on Atucha-2 NPP construction ending, have motivated the evaluation of a dry storage option for the interim management of spent fuel assemblies. Two different designs are presently being analyzed by an expert working group, from both technical and economical points of views. Authors are proposing a modular system consisting of an arrangement of reinforced concrete structures into which welded metallic canisters loaded with 37 spent fuel assemblies each stored in horizontal position. The reinforced concrete module is designed to provide the necessary physical protection and biological shielding to the loaded canisters during long-term storage, as well as passive means to remove the spent fuel decay heat by a combination of radiation, conduction and natural air convection. In this works are presented advances in the conceptual designs for a spent nuclear fuel system to Atucha I nuclear power plant. (author) [es

  12. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Science.gov (United States)

    2010-07-01

    ..., storage or disposal facility. If an eligible academic entity makes the hazardous waste determination... hazardous waste permit or interim status as soon as it arrives in the on-site treatment, storage or disposal... permitted treatment, storage or disposal facility. (e) If the unwanted material is a hazardous waste, the...

  13. Interim report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  14. Final Hazard Classification and Auditable Safety Analysis for the 105-F Building Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Bond, S.L.

    1998-07-01

    The auditable safety analysis (ASA) documents the authorization basis for the partial decommissioning and facility modifications to place the 105-F Building into interim safe storage (ISS). Placement into the ISS is consistent with the preferred alternative identified in the Record of Decision (58 FR). Modifications will reduce the potential for release and worker exposure to hazardous and radioactive materials, as well as lower surveillance and maintenance (S ampersand M) costs. This analysis includes the following: A description of the activities to be performed in the course of the 105-F Building ISS Project. An assessment of the inventory of radioactive and other hazardous materials within the 105-F Building. Identification of the hazards associated with the activities of the 105-F Building ISS Project. Identification of internally and externally initiated accident scenarios with the potential to produce significant local or offsite consequences during the 105-F Building ISS Project. Bounding evaluation of the consequences of the potentially significant accident scenarios. Hazard classification based on the bounding consequence evaluation. Associated safety function and controls, including commitments. Radiological and other employee safety and health considerations

  15. Final design of ITER port plug test facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerisier, Thierry, E-mail: thierry.cerisier@yahoo.fr [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, St Paul-lez-Durance Cedex, 13067 (France); Levesy, Bruno [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, St Paul-lez-Durance Cedex, 13067 (France); Romannikov, Alexander [Institution “Project Center ITER”, Kurchatov sq. 1, Building 3, Moscow 123182 (Russian Federation); Rumyantsev, Yuri [JSC “Cryogenmash”, Moscow reg., Balashikha 143907 (Russian Federation); Cordier, Jean-Jacques; Dammann, Alexis [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, St Paul-lez-Durance Cedex, 13067 (France); Minakov, Victor; Rosales, Natalya; Mitrofanova, Elena [JSC “Cryogenmash”, Moscow reg., Balashikha 143907 (Russian Federation); Portone, Sergey; Mironova, Ekaterina [Institution “Project Center ITER”, Kurchatov sq. 1, Building 3, Moscow 123182 (Russian Federation)

    2016-11-01

    Highlights: • We introduce the port plug test facility (purpose and status of the design). • We present the PPTF sub-systems. • We present the environmental and functional tests. • We present the occupational and nuclear safety functions. • We conclude on the achievements and next steps. - Abstract: To achieve the overall ITER machine availability target, the availability of diagnostics and heating port plugs shall be as high as 99.5%. To fulfill this requirement, it is mandatory to test the port plugs at operating temperature before installation on the machine and after refurbishment. The ITER port plug test facility (PPTF) is composed of several test stands that can be used to test the port plugs whereas at the end of manufacturing (in a non-nuclear environment), or after refurbishment in the ITER hot cell facility. The PPTF provides the possibility to perform environmental (leak tightness, vacuum and thermo-hydraulic performances) and functional tests (radio frequency acceptance tests, behavior of the plugs’ steering mechanism and calibration of diagnostics) on upper and equatorial port plugs. The final design of the port plug test facility is described. The configuration of the standalone test stands and the integration in the hot cell facility are presented.

  16. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    International Nuclear Information System (INIS)

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or ''Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs

  17. Pre-conceptual study on the review framework for the radiation shielding safety of the PWR spent fuel cask interim storage in Korea

    International Nuclear Information System (INIS)

    Kim, Byeong-Soo; Jeong, Jae-Hak; Jeong, Chan-Woo

    2006-01-01

    In Korea, 20 nuclear power plants are in operation and lots of spent fuels are on the onsite storage. The onsite storage capacity in Korea is supposed to be full around at the year of 2016 and interim storage facilities could be considered to be constructed before 2016. A review framework to evaluate the radiation shielding safety of the interim storage facilities is developed in this study. It includes acceptance criteria, review procedures and activities of independent analyses. A case study is performed to apply the review framework. Modeling the review reference storage, evaluating the source terms and calculating the photon fluxes are performed. It is shown that the application of the review framework could satisfy the regulatory demand that would arise in the near future in the review area of the radiation shielding safety of the interim storage in Korea. (author)

  18. Food labeling: health claims; D-tagatose and dental caries. Final rule.

    Science.gov (United States)

    2003-07-03

    The Food and Drug Administration (FDA) is adopting as a final rule, without change, the provisions of the interim final rule that amended the regulation authorizing a health claim on sugar alcohols and dental caries, i.e., tooth decay, to include the sugar D-tagatose as a substance eligible for the dental caries health claim. FDA is taking this action to complete the rulemaking initiated with the interim final rule.

  19. Uses of the waste heat from the interim fuel storage facility

    International Nuclear Information System (INIS)

    Wehrum, A.

    It was the objective of this study to investigate the possibilities of a convenient use of the waste heat from the designed interim fuel storage at Ahaus. In this sense the following possibilities have been investigated: district heating, heat for industrial processes, fish-production, green house-heating, production of methane from original waste, agrotherm (agricultur field heating). It has been shown, that an economical behaviour for nearly all variations is not given without the financial help of the government, because of the high costs for heat transport and out-put. The most economical project is the intensive fish production plant. (orig.) [de

  20. Implementation of the Ryan Haight Online Pharmacy Consumer Protection Act of 2008. Interim final rule with request for comments.

    Science.gov (United States)

    2009-04-06

    The Ryan Haight Online Pharmacy Consumer Protection Act, which was enacted on October 15, 2008, amended the Controlled Substances Act and Controlled Substances Import and Export Act by adding several new provisions to prevent the illegal distribution and dispensing of controlled substances by means of the Internet. DEA is hereby issuing an interim rule to amend its regulations to implement the legislation and is requesting comments on the interim rule.

  1. Interim report on the accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    2011-12-01

    The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (the Investigation Committee) of Tokyo Electric Power Company (TEPCO) was established by the Cabinet decision on May 24, 2011. Its objectives are: to conduct investigation for finding out the causes of accidents at the Fukushima Dai-ichi Nuclear Power Station (Fukushima Dai-ichi NPS) and Fukushima Dai-ni Nuclear Power Station (Fukushima Dai-ni NPS) of TEPCO as well as the causes of accident damage; and to make policy recommendations for limiting the expansion of damage and preventing reoccurrence of similar accidents. The Investigation Committee has conducted its investigation and evaluation since its first meeting on June 7, 2011. Its activities included: site visits to the Fukushima Dai-ichi and Dai-ni NPSs, as well as to other facilities; hearing of heads of local governments around the Fukushima Dai-ichi NPS; and hearing of people concerned through interviews mainly arranged by the Secretariat. As of December 16, 2011, the number of interviewees reached 456. The investigation and evaluation by the Investigation Committee are still ongoing and the Interim Report does not cover every item that the Committee aims at investigating and evaluating. Fact-finding of even some of those items discussed in the Interim Report are not yet completed. The Investigation Committee continues to conduct its investigation and evaluation and will issue its Final Report in the summer of 2012. This brief executive summary covers mainly considerations and evaluation of the issues in Chapter VII of the Interim Report, with brief reference to Chapters I to VI. The Investigation Committee recommendations are printed in bold. (author)

  2. Final safety-analysis report for the Fifth Calcined Solids Storage Facility

    International Nuclear Information System (INIS)

    1982-01-01

    Radioactive aqueous wastes generated by the solvent extraction of uranium from expended fuels at ICPP will be calcined in the New Waste Calcining Facility (NWCF). The calcined solids are pneumatically transferred to stainless steel bins enclosed in concrete vaults for interim storage of up to 500 years. The Fifth Calcined Solids Storage Facility (CSSF) provides 1000 m 3 of storage and consists of seven annular stainless steel bins inside a reinforced concrete vault set on bedrock. Storage of calcined solids is essentially a passive operation with very little opportunity for release of radionuclides and with no potential for criticality. There will be no potential for fire or explosion. Shielding has been designed to assure that the radiation levels at the vault exterior surfaces will be limited to less than 0.5 mRem/h. A sump in the vault floor will collect any in-leakage that may occur. Any water that collects in the sump will be sampled then removed with the sump jet. There will be an extremely small chance of release of radioactive particulates into the atmosphere as a result of a bin leak. The Design Basis Accident (DBA) postulates the spill of solids from an eroded fill line into the vault coupled with a failure of the vault cooling air radiation monitor. For the DBA, the maximum calculated radiation dose to an exposed individual near the site boundary is less than 1.2 μRem to the bone and lung

  3. Request for modification of 200 Area effluent treatment facility final delisting

    International Nuclear Information System (INIS)

    Bowman, R.C.

    1998-01-01

    A Delisting Petition submitted to the U.S. Environmental Protection Agency in August 1993 addressed effluent to be generated at the 200 Area Effluent Treatment Facility from treating Hanford Facility waste streams. This Delisting Petition requested that 71.9 million liters per year of treated effluent, bearing the designation 'F001' through 'F005', and/or 'F039' that is derived from 'F001' through 'F005' waste, be delisted. On June 13, 1995, the U.S. Environmental Protection Agency published the final rule (Final Delisting), which formally excluded 71.9 million liters per year of 200 Area Effluent Treatment Facility effluent from ''being listed as hazardous wastes'' (60 FR 31115 now promulgated in 40 CFR 261). Given the limited scope, it is necessary to request a modification of the Final Delisting to address the management of a more diverse multi-source leachate (F039) at the 200 Area Effluent Treatment Facility. From past operations and current cleanup activities on the Hanford Facility, a considerable amount of both liquid and solid Resource Conservation and Recovery Act of 1976 regulated mixed waste has been and continues to be generated. Ultimately this waste will be treated as necessary to meet the Resource Conservation and Recovery Act Land Disposal Restrictions. The disposal of this waste will be in Resource Conservation and Recovery Act--compliant permitted lined trenches equipped with leachate collection systems. These operations will result in the generation of what is referred to as multi-source leachate. This newly generated waste will receive the listed waste designation of F039. This waste also must be managed in compliance with the provisions of the Resource Conservation and Recovery Act

  4. Fall meeting 2004: information conference on engines. Final and interim reports of the research centres; Herbsttagung 2004: Informationstagung Motoren. Abschluss- und Zwischenberichte der Forschungsstellen

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The Proceedings (volume R526, 2004) of the Information Conference on Engines which has been held on the 23rd September 2004 in Pforzheim/Germany, contains ten final and interim reports. The subjects of the contributions presented were as follow: particulate filter with NOx storage coating; cause study on damage-relevant knocking combustion; spray wall interaction; binaural transfer path analysis synthesis; acoustical optimized sealing-systems on engine acoustics; working process caused gas exchange noise; knowledge based diesel engine optimization; frontal press fit assemblies; case hardening and autofrettage; oil condition sensor (orig.)

  5. Transport casks help solve spent fuel interim storage problems

    International Nuclear Information System (INIS)

    Dierkes, P.; Janberg, K.; Baatz, H.; Weinhold, G.

    1980-01-01

    Transport casks can be used as storage modules, combining the inherent safety of passive cooling with the absence of secondary radioactive waste and the flexibility to build up storage capacity according to actual requirements. In the Federal Republic of Germany, transport casks are being developed as a solution to its interim storage problems. Criteria for their design and licensing are outlined. Details are given of the casks and the storage facility. Tests are illustrated. (U.K.)

  6. Request for interim approval to operate Trench 94 of the 218-E-12B Burial Ground as a chemical waste landfill for disposal of polychlorinated biphenyl waste in submarine reactor compartments

    International Nuclear Information System (INIS)

    Cummins, G.D.

    1994-06-01

    This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of this waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy's (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS

  7. Final generic environmental impact statement on decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    1988-08-01

    This final generic environmental impact statement was prepared as part of the requirement for considering changes in regulations on decommissioning of commercial nuclear facilities. Consideration is given to the decommissioning of pressurized water reactors, boiling water reactors, research and test reactors, fuel reprocessing plants (FRPs) (currently, use of FRPs in the commercial sector is not being considered), small mixed oxide fuel fabrication plants, uranium hexafluoride conversion plants, uranium fuel fabrication plants, independent spent fuel storage installations, and non-fuel-cycle facilities for handling byproduct, source and special nuclear materials. Decommissioning has many positive environmental impacts such as the return of possibly valuable land to the public domain and the elimination of potential problems associated with increased numbers of radioactively contaminated facilities with a minimal use of resources. Major adverse impacts are shown to be routine occupational radiation doses and the commitment of nominally small amounts of land to radioactive waste disposal. Other impacts, including public radiation doses, are minor. Mitigation of potential health, safety, and environmental impacts requires more specific and detailed regulatory guidance than is currently available. Recommendations are made as to regulatory decommissioning particulars including such aspects as decommissioning alternatives, appropriate preliminary planning requirements at the time of commissioning, final planning requirements prior to termination of facility operations, assurance of funding for decommissioning, environmental review requirements. 26 refs., 7 figs., 68 tabs

  8. Effectiveness of interim remedial actions at the Niagara Falls Storage Site

    International Nuclear Information System (INIS)

    Devgun, J.S.; Beskid, N.J.; Seay, W.M.; McNamee, E.

    1990-01-01

    There are 190,000 m 3 of contaminated soils, wastes, and residues stored at the Niagara Falls Storage Site (NFSS). The residues have a volume of 18,000 m 3 and contain about 1,930 Ci of 226 Ra, which accounts for most of the radioactivity. Since 1980, actions have been taken to minimize potential radiological risks and prevent radionuclide migration. Interim actions included capping vents, sealing pipes, relocating the perimeter fence (to limit radon risk), transferring and consolidating wastes, upgrading storage buildings, constructing a clay cutoff wall (to limit potential ground-water transport of contaminants), treating and releasing contaminated water, using a synthetic liner, and using an interim clay cap. An interim waste containment facility was completed in 1986. Environmental monitoring showed a decrease in radon concentrations and in external gamma radiation from 1982 to 1986; levels have been stable since 1986. Uranium and radium concentrations in surface water have decreased; very low concentrations have been detected in stream sediments, and concentrations in ground water have remained stable. Recent monitoring showed that NFSS is in compliance with the U.S. Department of Energy's (DOE's) radiation protection standards

  9. Request for modification of 200 Area effluent treatment facility final delisting

    Energy Technology Data Exchange (ETDEWEB)

    BOWMAN, R.C.

    1998-11-19

    A Delisting Petition submitted to the U.S. Environmental Protection Agency in August 1993 addressed effluent to be generated at the 200 Area Effluent Treatment Facility from treating Hanford Facility waste streams. This Delisting Petition requested that 71.9 million liters per year of treated effluent, bearing the designation 'F001' through 'F005', and/or 'F039' that is derived from 'F001' through 'F005' waste, be delisted. On June 13, 1995, the U.S. Environmental Protection Agency published the final rule (Final Delisting), which formally excluded 71.9 million liters per year of 200 Area Effluent Treatment Facility effluent from ''being listed as hazardous wastes'' (60 FR 31115 now promulgated in 40 CFR 261). Given the limited scope, it is necessary to request a modification of the Final Delisting to address the management of a more diverse multi-source leachate (F039) at the 200 Area Effluent Treatment Facility. From past operations and current cleanup activities on the Hanford Facility, a considerable amount of both liquid and solid Resource Conservation and Recovery Act of 1976 regulated mixed waste has been and continues to be generated. Ultimately this waste will be treated as necessary to meet the Resource Conservation and Recovery Act Land Disposal Restrictions. The disposal of this waste will be in Resource Conservation and Recovery Act--compliant permitted lined trenches equipped with leachate collection systems. These operations will result in the generation of what is referred to as multi-source leachate. This newly generated waste will receive the listed waste designation of F039. This waste also must be managed in compliance with the provisions of the Resource Conservation and Recovery Act.

  10. 7 CFR 1738.21 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  11. Reference values on safety regulation of land disposal of low level radioactive solid waste (the second interim report) and its incorporation into legal regulations

    International Nuclear Information System (INIS)

    Aoki, Terumi

    1994-01-01

    Safety regulation of land disposal of low level radioactive solid waste in Japan is based on 'the basic philosophy on the safety regulation of land disposal of low level radioactive solid waste' determined by the Nuclear safety Committee (October 1985). The basic philosophy on the upper limit of radioactivity of disposed wastes was published as the reference values in the interim report (February 1987) and in the second interim report (June 1992). In the second interim report, the upper limits of radioactivity are established for three types of solid radioactive wastes: 1) metals, incombustible or flame resistant wastes generated nuclear reactor facilities and solidified in vessels, 2) large metallic structures generated from decommissioning of reactor facilities and difficult to solidify in vessels, and 3) radioactive concrete waste generated from decommissioning of reactor facilities. The upper limits of radioactivity are presented for C-14, Co-60, Ni-63, Sr-90, Cs-137, alfa-emmitters, Ca-41 (for concrete) and Eu-152 (for concrete). Related laws and regulations in Japan on safe disposal of low level wastes are explained. (T.H.)

  12. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  13. 7 CFR 1735.75 - Interim financing.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  14. Request for interim approval to operate Trench 94 of the 218-E-12B Burial Ground as a chemical waste landfill for disposal of polychlorinated biphenyl waste in submarine reactor compartments. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Cummins, G.D.

    1994-06-01

    This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of this waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy`s (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS.

  15. 13 CFR 120.890 - Source of interim financing.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source (including...

  16. Safety of interim storage solutions of used nuclear fuel during extended term

    Energy Technology Data Exchange (ETDEWEB)

    Shelton, C.; Bader, S.; Issard, H.; Arslan, M. [AREVA, 7135 Minstrel Way, Suite 300 Columbia, MD 21045 (United States)

    2013-07-01

    In 2013, the total amount of stored used nuclear fuel (UNF) in the world will reach 225,000 T HM. The UNF inventory in wet storage will take up over 80% of the available total spent fuel pool (SFP) capacity. Interim storage solutions are needed. They give flexibility to the nuclear operators and ensure that nuclear reactors continue to operate. However, we need to keep in mind that they are also an easy way to differ final decision and implementation of a UNF management approach (recycling or final disposal). In term of public perception, they can have a negative impact overtime as it may appear that nuclear industry may have significant issues to resolve. In countries lacking an integrated UNF management approach, the UNF are being discharged from the SFPs to interim storage (mostly to dry storage) at the same rate as UNF is being discharged from reactors, as the SFPs at the reactor sites are becoming full. This is now the case in USA, Taiwan, Switzerland, Spain, South Africa and Germany. For interim storage, AREVA has developed different solutions in order to allow the continued operation of reactors while meeting the current requirements of Safety Authorities: -) Dry storage canisters on pads, -) Dual-purpose casks (dry storage and transportation), -) Vault dry storage, and -) Centralized pool storage.

  17. Cost Sensitivity Analysis for Consolidated Interim Storage of Spent Fuel: Evaluating the Effect of Economic Environment Parameters

    Energy Technology Data Exchange (ETDEWEB)

    Cumberland, Riley M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Kent Alan [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jarrell, Joshua J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Joseph, III, Robert Anthony [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-12-01

    This report evaluates how the economic environment (i.e., discount rate, inflation rate, escalation rate) can impact previously estimated differences in lifecycle costs between an integrated waste management system with an interim storage facility (ISF) and a similar system without an ISF.

  18. Developing new transportable storage casks for interim dry storage

    International Nuclear Information System (INIS)

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R.

    2004-01-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication

  19. Transuranic-contaminated solid waste Treatment Development Facility. Final safety analysis report

    International Nuclear Information System (INIS)

    Warner, C.L.

    1979-07-01

    The Final Safety Analysis Report (FSAR) for the Transuranic-Contaminated Solid-Waste Treatment Facility has been prepared in compliance with the Department of Energy (DOE) Manual Chapter 0531, Safety of Nonreactor Nuclear Facilities. The Treatment Development Facility (TDF) at the Los Alamos Scientific Laboratory is a research and development facility dedicated to the study of radioactive-waste-management processes. This analysis addresses site assessment, facility design and construction, and the design and operating characteristics of the first study process, controlled air incineration and aqueous scrub off-gas treatment with respect to both normal and accident conditions. The credible accidents having potentially serious consequences relative to the operation of the facility and the first process have been analyzed and the consequences of each postulated credible accident are presented. Descriptions of the control systems, engineered safeguards, and administrative and operational features designed to prevent or mitigate the consequences of such accidents are presented. The essential features of the operating and emergency procedures, environmental protection and monitoring programs, as well as the health and safety, quality assurance, and employee training programs are described

  20. Transuranic-contaminated solid waste Treatment Development Facility. Final safety analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Warner, C.L. (comp.)

    1979-07-01

    The Final Safety Analysis Report (FSAR) for the Transuranic-Contaminated Solid-Waste Treatment Facility has been prepared in compliance with the Department of Energy (DOE) Manual Chapter 0531, Safety of Nonreactor Nuclear Facilities. The Treatment Development Facility (TDF) at the Los Alamos Scientific Laboratory is a research and development facility dedicated to the study of radioactive-waste-management processes. This analysis addresses site assessment, facility design and construction, and the design and operating characteristics of the first study process, controlled air incineration and aqueous scrub off-gas treatment with respect to both normal and accident conditions. The credible accidents having potentially serious consequences relative to the operation of the facility and the first process have been analyzed and the consequences of each postulated credible accident are presented. Descriptions of the control systems, engineered safeguards, and administrative and operational features designed to prevent or mitigate the consequences of such accidents are presented. The essential features of the operating and emergency procedures, environmental protection and monitoring programs, as well as the health and safety, quality assurance, and employee training programs are described.

  1. Transport, handling, and interim storage of intermediate-level transuranic waste at the INEL

    International Nuclear Information System (INIS)

    Metzger, J.C.; Snyder, A.M.

    1977-09-01

    The Idaho National Engineering Laboratory stores transuranic (TRU)-contaminated waste emitting significant amounts of beta-gamma radiation. This material is referred to as intermediate-level TRU waste. The Energy Research and Development Administration requires that this waste be stored retrievably during the interim before a Federal repository becomes operational. Waste form and packaging criteria for the eventual storage of this waste at a Federal repository, i.e., the Waste Isolation Pilot Plant (WIPP), have been tentatively established. The packaging and storage techniques now in use at the Idaho National Engineering Laboratory are compatible with these criteria and also meet the requirement that the waste containers remain in a readily-retrievable, contamination-free condition during the interim storage period. The Intermediate Level Transuranic Storage Facility (ILTSF) provides below-grade storage in steel pipe vaults for intermediate-level TRU waste prior to shipment to the WIPP. Designated waste generating facilities, operated for the Energy Research and Development Administration, use a variety of packaging and transportation methods to deliver this waste to the ILTSF. Transfer of the waste containers to the ILTSF storage vaults is accomplished using handling methods compatible with these waste packaging and transport methods

  2. Site selection - siting of the final repository for spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-03-01

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  3. Site selection - siting of the final repository for spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-03-15

    SKB has selected Forsmark as the site for the final repository for spent nuclear fuel. The site selection is the end result of an extensive siting process that began in the early 1990s. The strategy and plan for the work was based on experience from investigations and development work over a period of more than ten years prior to then. This document describes the siting work and SKB's choice of site for the final repository. It also presents the information on which the choice was based and the reasons for the decisions made along the way. The document comprises Appendix PV to applications under the Nuclear Activities Act and the Environmental Code for licences to build and operate an encapsulation plant adjacent to the central interim storage facility for spent nuclear fuel in Oskarshamn, and to build and operate a final repository for spent nuclear fuel in Forsmark in Oesthammar Municipality

  4. Final closure plan for the high-explosives open burn treatment facility at Lawrence Livermore National Laboratory Experimental Test Site 300

    Energy Technology Data Exchange (ETDEWEB)

    Mathews, S.

    1997-04-01

    This document addresses the interim status closure of the HE Open Bum Treatment Facility, as detailed by Title 22, Division 4.5, Chapter 15, Article 7 of the Califonia Code of Regulations (CCR) and by Title 40, Code of Federal Regulations (CFR) Part 265, Subpart G, ``Closure and Post Closure.`` The Closure Plan (Chapter 1) and the Post- Closure Plan (Chapter 2) address the concept of long-term hazard elimination. The Closure Plan provides for capping and grading the HE Open Bum Treatment Facility and revegetating the immediate area in accordance with applicable requirements. The Closure Plan also reflects careful consideration of site location and topography, geologic and hydrologic factors, climate, cover characteristics, type and amount of wastes, and the potential for contaminant migration. The Post-Closure Plan is designed to allow LLNL to monitor the movement, if any, of pollutants from the treatment area. In addition, quarterly inspections will ensure that all surfaces of the closed facility, including the cover and diversion ditches, remain in good repair, thus precluding the potential for contaminant migration.

  5. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  6. 24 CFR 35.1330 - Interim controls.

    Science.gov (United States)

    2010-04-01

    ... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim..., cleanable covering or coating, such as metal coil stock, plastic, polyurethane, or linoleum. (3) Surfaces...

  7. Development of dual-purpose metal cask for interim storage of spent nuclear fuel (1). Outline of cask structure

    International Nuclear Information System (INIS)

    Shimizu, Masashi; Hayashi, Makoto; Kashiwakura, Jun

    2003-01-01

    Spent fuels discharged from nuclear power plants in Japan are planed to be reprocessed at the nuclear fuel recycle plant under construction at Rokkasho-mura. Since the amount of the spent fuels exceeds that of recycled fuel, the spent fuels have to be properly stored and maintained as recycle fuel resource until the beginning of the reprocessing. For that sake, interim storage installations are being constructed outside the nuclear power plants by 2010. The storage dry casks have been practically used as the interim storage in the nuclear power plants. From this reason, the storage system using the storage dry casks is promising as the interim storage installations away form the reactors, which are under discussion. In the interim storage facilities, the storage using the dry cask of the storage metal cask with business showings, having the function of transportation is now under discussion. By employing transportation and storage dual-purpose cask, the repack equipments can be exhausted, and the reliability of the interim storage installations can be increased. Hitachi, Ltd. has been developing the high reliable and economical transportation and storage dry metal cask. In this report, the outline of our developing transportation and storage dry cask is described. (author)

  8. Solid waste burial grounds interim safety analysis

    International Nuclear Information System (INIS)

    Saito, G.H.

    1994-01-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment

  9. Solid waste burial grounds interim safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  10. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Wilson, J.F. (PRC, Inc. (US))

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  11. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  12. 340 Facility compliance assessment

    International Nuclear Information System (INIS)

    English, S.L.

    1993-10-01

    This study provides an environmental compliance evaluation of the RLWS and the RPS systems of the 340 Facility. The emphasis of the evaluation centers on compliance with WAC requirements for hazardous and mixed waste facilities, federal regulations, and Westinghouse Hanford Company (WHC) requirements pertinent to the operation of the 340 Facility. The 340 Facility is not covered under either an interim status Part A permit or a RCRA Part B permit. The detailed discussion of compliance deficiencies are summarized in Section 2.0. This includes items of significance that require action to ensure facility compliance with WAC, federal regulations, and WHC requirements. Outstanding issues exist for radioactive airborne effluent sampling and monitoring, radioactive liquid effluent sampling and monitoring, non-radioactive liquid effluent sampling and monitoring, less than 90 day waste storage tanks, and requirements for a permitted facility

  13. Interim Design Report

    CERN Document Server

    Choubey, S.; Goswami, S.; Berg, J.S.; Fernow, R.; Gallardo, J.C.; Gupta, R.; Kirk, H.; Simos, N.; Souchlas, N.; Ellis, M.; Kyberd, P.; Benedetto, E.; Fernandez-Martinez, E.; Efthymiopoulos, I.; Garoby, R.; Gilardoni, S.; Martini, M.; Prior, G.; Ballett, P.; Pascoli, S.; Bross, A.; Geer, S.; Johnstone, C.; Kopp, J.; Mokhov, N.; Morfin, J.; Neuffer, D.; Parke, S.; Popovic, M.; Strait, J.; Striganov, S.; Blondel, A.; Dufour, F.; Laing, A.; Soler, F.J.P; Lindner, M.; Schwetz, T.; Alekou, A.; Apollonio, M.; Aslaninejad, M.; Bontoiu, C.; Dornan, P.; Eccleston, R.; Kurup, A.; Long, K.; Pasternak, J.; Pozimski, J.; Bogacz, A.; Morozov, V.; Roblin, Y.; Bhattacharya, S.; Majumdar, D.; Mori, Y.; Planche, T.; Zisman, M.; Cline, D.; Stratakis, D.; Ding, X.; Coloma, P.; Donini, A.; Gavela, B.; Lopez Pavon, J.; Maltoni, M.; Bromberg, C.; Bonesini, M.; Hart, T.; Kudenko, Y.; Mondal, N.; Antusch, S.; Blennow, M.; Ota, T.; Abrams, R.J.; Ankenbrandt, C.M.; Beard, K.B.; Cummings, M.A.C.; Flanagan, G.; Johnson, R.P.; Roberts, T.J.; Yoshikawa, C.Y.; Migliozzi, P.; Palladino, V.; de Gouvea, A.; Graves, V.B.; Kuno, Y.; Peltoniemi, J.; Blackmore, V.; Cobb, J.; Witte, H.; Mezzetto, M.; Rigolin, S.; McDonald, K.T.; Coney, L.; Hanson, G.; Snopok, P.; Tortora, L.; Andreopoulos, C.; Bennett, J.R.J.; Brooks, S.; Caretta, O.; Davenne, T.; Densham, C.; Edgecock, R.; Kelliher, D.; Loveridge, P.; McFarland, A.; Machida, S.; Prior, C.; Rees, G.; Rogers, C.; Thomason, J.W.G.; Booth, C.; Skoro, G.; Karadzhov, Y.; Matev, R.; Tsenov, R.; Samulyak, R.; Mishra, S.R.; Petti, R.; Dracos, M.; Yasuda, O.; Agarwalla, S.K.; Cervera-Villanueva, A.; Gomez-Cadenas, J.J.; Hernandez, P.; Li, T.; Martin-Albo, J.; Huber, P.; Back, J.; Barker, G.; Harrison, P.; Meloni, D.; Tang, J.; Winter, W.

    2011-01-01

    The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites shou...

  14. International ISOE Workshop - Direction Forward for the Finalization of the EG-SAM Report

    International Nuclear Information System (INIS)

    Okyar, H. Burcin

    2014-01-01

    The objective of the ISOE Expert Group on Occupational Radiation Protection in Severe Accident Management and Post-accident Recovery (EG-SAM) is to develop a report on best radiation protection management procedures for proper radiation protection job coverage during severe accident initial response and recovery efforts to identify good radiation protection practices and to organise and communicate radiation protection lessons learned from previous reactor accidents. The outcome of the work will be a new ISOE publication on Occupational Radiation Protection in severe accident management that will find broad use within the NPP radiation protection community. The EG-SAM has finalized an interim report which was presented at the Washington workshop. The interim report covered the following topics: RP Management and Organisation; RP Training and Exercises related to Severe Accident Management; Facility Configuration and Readiness; Overall Approach for Worker Protection; Monitoring and Managing the Radioactive Releases and Contamination; Key Lessons Learned from Past Accidents; Conclusions. Utilities and Regulatory Authorities have identified the factors and aspects which play key roles in achieving good practices on occupational radiation protection in severe accident management and post-accident recovery: knowledge, experience, technology, regulatory requirements and guidance, worker involvement, information exchange, training aspects, etc. They have analysed and quantified their impact on worker doses, and submitted recommendations for further work. The next step will be a final meeting of the EG-SAM for the finalization of the report with workshop inputs before its submission for approval

  15. Interim storage is not long-term disposal

    International Nuclear Information System (INIS)

    Vincenti, J.R.

    1994-01-01

    Starting in June 30, 1994 South Carolina enforced an embargo on regular shipments of low-level radioactive waste to the Barnwell repository. The failure of 31 states and their respective compacts to provide access to a long-term disposal facility as stipulated by the low-level radioactive Waste Policy Act of 1980 promotes waste disposal gridlock and anticipates another waste disposal crisis. This article discusses the problem using the following topics: Appalachian Compact Users of Radioactive Isotopes (ACURI) Association's interest; the problem of denial of access to Barnwell; pro and contra interim storage; vital services and benefits at risk; issues at the ACURI meeting; nobel Prize winners use radioactive materials; if perception is reality, politics is prevalent

  16. Unit cell modeling in support of interim performance assessment for low level tank waste disposal

    International Nuclear Information System (INIS)

    Kline, N.W.

    1996-01-01

    A unit cell model is used to simulate the base analysis case and related sensitivity cases for the interim performance assessment of low level tank waste disposal. Simulation case results are summarized in terms of fractional contaminant release rates to the vadose zone and to the water table at the unconfined aquifer. Results suggest that the crushed glass water conditioning layer at the top of the facility and the chemical retardation pad at the bottom of the facility can be important components of the facility. Results also suggest that the release rates to the water table are dominated by the release rate from the waste form

  17. Comparison of concepts for independent spent fuel storage facilities

    International Nuclear Information System (INIS)

    Held, Ch.; Hintermayer, H.P.

    1978-01-01

    The design and the construction costs of independent spent fuel storage facilities show significant differences, reflecting the fuel receiving rate (during the lifetime of the power plant or within a very short period), the individual national policies and the design requirements in those countries. Major incremental construction expenditures for storage facilities originate from the capacity and the type of the facilities (casks or buildings), the method of fuel cooling (water or air), from the different design of buildings, the redundancy of equipment, an elaborate quality assurance program, and a single or multipurpose design (i.e. interim or long-term storage of spent fuel, interim storage of high level waste after fuel storage). The specific costs of different designs vary by a factor of 30 to 60 which might in the high case increase the nuclear generating costs remarkably. The paper also discusses the effect of spent fuel storage on fuel cycle alternatives with reprocessing or disposal of spent fuel. (author)

  18. Fugitive hydrocarbon emissions from pacific OCS facilities. Volume 1. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    In January 1989, the Minerals Management Service (MMS) conducted a study using the latest approved methods for emission screening and sampling solely on Outer Continental Shelf (OCS) oil and gas platforms in the Santa Barbara Channel in order to determine platform emission rates more representative of that region. The study was designed and reviewed throughout its conduct by a Quality Review Board (QRB) composed of air resource agencies and industry. Representatives from the Tri-county Air Pollution Control Districts and the MMS actively participated at these meetings. Some participants expressed concerns about some of the methods used and the study results. ABB's thorough responses to these questions and comments were submitted to all reviewers before the printing of the final report, and are contained in appendices of the study final report now available to the public. The results of the MMS study show that the average emission factors for the Pacific OCS oil and gas facilities measured in 1989 are 3.5 times lower than those Pacific OCS facilities sampled in the 1979 API/Rockwell study, and 7.8 times lower than the Gulf of Mexico OCS facilities sampled in the same 1979 study. Efforts to determine the quantitative effect of inspection and maintenance programs on controlling emissions were inconclusive

  19. Communication strategy for final disposal facility

    International Nuclear Information System (INIS)

    Seppaelae, Timo; Kurki, Osmo

    2000-01-01

    In May 1999, Posiva filed an application for a policy decision to the Council of State on the construction of a final disposal facility for spent nuclear fuel in Olkiluoto in the municipality of Eurajoki. The decision to be made by the Council of State must be ratified by the Parliament. The precondition for a positive decision is that the preliminary statement on safety to be provided by STLTK by the end of the year 1999 is in favour of Posiva. continuing with its repository development programme, and that the Eurajoki municipality approves the project in its statement by the 28th of January 2000. The policy decision by the Council of State is expected to be made in March followed by the ratification of the Parliament before the summer. In a poll-carried out among 350 decision-makers, less than 10 % of those who answered 134 persons) found Internet as the most important source of Posiva's information on final disposal. On the other hand, over 80 % of those who answered found the information folder as the most significant source of information. When considering all the information available on final disposal (TV, radio, newspapers, authorities, environmental organisations, etc.) Posiva was found to be the most significant source of information while newspapers and periodicals came second. In this case the environmental organisations seemed to have a minor role, as a result of not being too active in confrontation. As a conclusive remark it can be assumed that because it is not only Posiva's information that is relevant to decision-makers, but the media also plays a significant role, the impression that decision-makers have of final disposal is based on a mixture of messages coming from Posiva and from the media. That is why the communication related to decision-makers is also communication with media, in order to ensure that the messages produced by the media support the information produced by Posiva

  20. Proceedings of the Topical Meeting on the safety of nuclear fuel cycle intermediate storage facilities

    International Nuclear Information System (INIS)

    1998-01-01

    The CSNI Working Group on Fuel Cycle Safety held an International Topical Meeting on safety aspects of Intermediate Storage Facilities in Newby Bridge, England, from 28 to 30 October 1997. The main purpose of the meeting was to provide a forum for the exchange of information on the technical issues on the safety of nuclear fuel cycle facilities (intermediate storage). Titles of the papers are: An international view on the safety challenges to interim storage of spent fuel. Interim storage of intermediate and high-level waste in Belgium: a description and safety aspects. Encapsulated intermediate level waste product stores at Sellafield. Safety of interim storage facilities of spent fuel: the international dimension and the IAEA's activities. Reprocessing of irradiated fuel and radwaste conditioning at Belgoprocess site: an overview. Retrieval of wastes from interim storage silos at Sellafield. Outline of the fire and explosion of the bituminization facility and the activities of the investigation committee (STAIJAERI). The fire and explosion incident of the bituminization facility and the lessons learned from the incident. Study on the scenario of the fire incident and related analysis. Study on the scenario of the explosion incident and related analysis. Accident investigation board report on the May 14, 1997 chemical explosion at the plutonium reclamation facility, Hanford site, Richland, Washington. Dry interim storage of spent nuclear fuel elements in Germany. Safe and effective system for the bulk receipt and storage of light water reactor fuel prior to reprocessing. Receiving and storage of glass canisters at vitrified waste storage center of Japan Nuclear Fuel Ltd. Design and operational experience of dry cask storage systems. Sellafield MOX plant; Plant safety design (BNFL). The assessment of fault studies for intermediate term waste storage facilities within the UK nuclear regulatory regime. Non-active and active commissioning of the thermal oxide

  1. Swedish spent fuel management systems, facilities and operating experiences

    International Nuclear Information System (INIS)

    Vogt, J.

    1998-01-01

    About 50% of the electricity in Sweden is generated by means of nuclear power from 12 LWR reactors located at four sites and with a total capacity of 10,000 MW. The four utilities have jointly created SKB, the Swedish Nuclear Fuel and Waste Management Company, which has been given the mandate to manage the spent fuel and radioactive waste from its origin at the reactors to the final disposal. SKB has developed a system for the safe handling of all kinds of radioactive waste from the Swedish nuclear power plants. The keystones now in operation of this system are a transport system, a central interim storage facility for spent nuclear fuel (CLAB), a final repository for short-lived, low and intermediate level waste (SFR). The remaining, system components being planned are an encapsulation plant for spent nuclear fuel and a deep repository for encapsulated spent fuel and other long-lived radioactive wastes. (author)

  2. Developing new transportable storage casks for interim dry storage

    Energy Technology Data Exchange (ETDEWEB)

    Hayashi, K.; Iwasa, K.; Araki, K.; Asano, R. [Hitachi Zosen Diesel and Engineering Co., Ltd., Tokyo (Japan)

    2004-07-01

    Transportable storage metal casks are to be consistently used during transport and storage for AFR interim dry storage facilities planning in Japan. The casks are required to comply with the technical standards of regulations for both transport (hereinafter called ''transport regulation'') and storage (hereafter called ''storage regulation'') to maintain safety functions (heat transfer, containment, shielding and sub-critical control). In addition to these requirements, it is not planned in normal state to change the seal materials during storage at the storage facility, therefore it is requested to use same seal materials when the casks are transported after storage period. The dry transportable storage metal casks that satisfy the requirements have been developed to meet the needs of the dry storage facilities. The basic policy of this development is to utilize proven technology achieved from our design and fabrication experience, to carry out necessary verification for new designs and to realize a safe and rational design with higher capacity and efficient fabrication.

  3. Interim data quality objectives for waste pretreatment and vitrification. Revision 1

    International Nuclear Information System (INIS)

    Kupfer, M.J.; Conner, J.M.; Kirkbride, R.A.; Mobley, J.R.

    1994-01-01

    The Tank Waste Remediation System (TWRS) is responsible for storing, processing, and immobilizing the Hanford Site tank wastes. Characterization information on the tank wastes is needed so that safety concerns can be addressed, and retrieval, pretreatment, and immobilization processes can be designed, permitted, and implemented. This document describes the near-term tank waste sampling and characterization needs of the Pretreatment, High-Level Waste (HLW) Disposal, and Low-Level Waste (LLW) Disposal Programs to support the TWRS disposal mission. The final DQO (Data Quality Objective) will define specific waste tanks to be sampled, sample timing requirements, an appropriate analytical scheme, and a list of required analytes. This interim DQO, however, focuses primarily on the required analytes since the tanks to be sampled in FY 1994 and early FY 1995 are being driven most heavily by other considerations, particularly safety. The major objective of this Interim DQO is to provide guidance for tank waste characterization requirements for samples taken before completion of the final DQO. The characterization data needs defined herein will support the final DQO to help perform the following: Support the TWRS technical strategy by identification of the chemical and physical composition of the waste in the tanks and Guide development efforts to define waste pretreatment processes, which will in turn define HLW and LLW feed to vitrification processes

  4. 78 FR 53821 - Federal Property Suitable as Facilities To Assist the Homeless

    Science.gov (United States)

    2013-08-30

    ... concerning the processing of applications, the reader is encouraged to refer to the interim rule governing...: 21201330045 Status: Excess Comments: Off-site removal only; 2,560 sf.; dining facility; 78 yrs. old; poor... Comments: off-site removal only; 13,493 sf.; dining facility; deteriorating; asbestos Building 07636...

  5. Data breaches. Final rule.

    Science.gov (United States)

    2008-04-11

    This document adopts, without change, the interim final rule that was published in the Federal Register on June 22, 2007, addressing data breaches of sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). This final rule implements certain provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006. The regulations prescribe the mechanisms for taking action in response to a data breach of sensitive personal information.

  6. Radiological Characterization and Final Facility Status Report Tritium Research Laboratory

    International Nuclear Information System (INIS)

    Garcia, T.B.; Gorman, T.P.

    1996-08-01

    This document contains the specific radiological characterization information on Building 968, the Tritium Research Laboratory (TRL) Complex and Facility. We performed the characterization as outlined in its Radiological Characterization Plan. The Radiological Characterization and Final Facility Status Report (RC ampersand FFSR) provides historic background information on each laboratory within the TRL complex as related to its original and present radiological condition. Along with the work outlined in the Radiological Characterization Plan (RCP), we performed a Radiological Soils Characterization, Radiological and Chemical Characterization of the Waste Water Hold-up System including all drains, and a Radiological Characterization of the Building 968 roof ventilation system. These characterizations will provide the basis for the Sandia National Laboratory, California (SNL/CA) Site Termination Survey .Plan, when appropriate

  7. Final disposal of spent fuel in the Finnish bedrock

    International Nuclear Information System (INIS)

    1992-12-01

    Teollisuuden Voima Oy (TVO) is preparing for the final disposal of spent nuclear fuel from the Olkiluoto nuclear power plant (TVO-I and TVO-II reactors). According to present estimates, a total of 1840 tU of spent fuel will be accumulated during the 40-year lifetime of the power plant. An interim storage facility for spent fuel (TVO-KPA Store) has operated at Olkiluoto since 1987. The spent fuel will be held in storage for several decades before it is shipped to the repository site. Both train and road transportation are possible. The spent fuel will be encapsulated in composite copper and steel canisters (ACP Canister) in a facility that will be build above the ground on the site where the repository is located. The repository will be constructed at the depth of several hundreds of meters in the bedrock. In 1987 five areas were selected for preliminary site investigations. The safety analysis (TVO-92) that was carried out shows that the proposed safety criteria would be met at each of the candidate sites. In future expected conditions there would never be significant releases of radioactive substances to the biosphere. The site investigations will be continued in the period 1993 to 2000. In parallel, a R and D programme will be devoted to the safety and technology of final disposal. The site for final disposal will be selected in the year 2000 with the aim of having the capability to start the disposal operations in 2020

  8. Interim Administrators in Higher Education: A National Study

    Science.gov (United States)

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  9. Status of spent fuel storage facilities in Switzerland

    International Nuclear Information System (INIS)

    Beyeler, P.C.; Lutz, H.R.; Heesen, W. von

    1999-01-01

    Planning of a dry spent fuel storage facility in Switzerland started already 15 years ago. The first site considered for a central interim storage facility was the cavern of the decommissioned pilot nuclear plant at Lucens in the French-speaking part of Switzerland. This project was terminated in the late eighties because of lack of public acceptance. The necessary acceptance was found in the small town of Wuerenlingen which has hosted for many years the Swiss Reactor Research Centre. The new project consists of centralised interim storage facilities for all types of radioactive waste plus a hot cell and a conditioning and incinerating facility. It represents a so-called integrated storage solution. In 1990, the new company 'ZWILAG Zwischenlager Wuerenlingen AG' (ZWILAG) was founded and the licensing procedures according to the Swiss Atomic law were initiated. On August 26, 1996 ZWILAG got the permit for construction of the whole facility including the operating permit for the storage facilities. End of construction and commissioning are scheduled for autumn 1999. The nuclear power station Beznau started planning a low level waste and spent fuel storage facility on its own, because in 1990 its management thought that by 1997 the first high active waste from the reprocessing facilities in France would have to be taken back. This facility at the Beznau site, called ZWIBEZ, was licensed according to a shorter procedure so its construction was finished by 1997. The two facilities for high level waste and spent fuel provide space for a total of 278 casks, which is sufficient for the waste and spent fuel of the four Swiss nuclear power stations including their life extension programme. (author)

  10. Reliability Centered Maintenance for Savannah River Site`s interim waste management facilities. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Wilson, J.F. [PRC, Inc. (US)

    1992-06-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  11. Subsurface Interim Measures/Interim Remedial Action Plan/Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This IM/IRAP/EA identifies and evaluates interim remedial actions for removal of residual free-phase VOC contamination from three different subsurface environments at OU2. The term ''residual'' refers to the non-aqueous phase contamination remaining in the soil matrix (by capillary force) subsequent to the passage of non-aqueous or free-phase liquid through the subsurface. In addition to the proposed actions, this IM/IRAP/EA presents an assessment of the No Action Alternative. This document also considers an interim remedial action for the removal of radionuclides from beneath the 903 Pad

  12. Reactivation of the Shock-Tunnel Facility at Fort Cronkhite. Final report

    International Nuclear Information System (INIS)

    1982-05-01

    This final report describes the results of work undertaken to reactivate the Shock Tunnel Facility at Battery Townsley, Fort Cronkhite, Marin County, California. The facility has been reactivated and can not be utilized for blast testing. The major emphasis will be testing of concepts pertaining to programs of interest to the Federal Emergency Management Agency (FEMA) and in particular to civil defense oriented research. However, a wide variety of testing requirements can be accommodated. For example, past programs at the facility have included: tests of debris from trees subjected to blast for Bell Telephone Laboratories; tests of the response of aluminum hull panels to blast loading and of the response of a model surface effects ship for the Naval Ship Research and Development center, and tests of the response of a radome prototype to blast loading conducted for ANCOM (the radome manufacturer). The Shock Tunnel Facility is located in a former coastal defense 16-inch gun emplacement constructed by the US Army beginning in 1938. It was converted in 1967 to serve as a facility for full-scale testing of the loading and response of structural elements and civil defense equipment. It remained in operation until November 1976 when Battery Townsley was turned over to the National Park Service. Work under the present purchase order consisted of the following major tasks: (I) cleanup and secure the facility, (II) reactivate the shock tunnel, and (III) design permanent facility improvements

  13. Decision on performing interim analysis for comparative clinical trials.

    Science.gov (United States)

    Pak, Kyongsun; Jacobus, Susanna; Uno, Hajime

    2017-09-01

    In randomized-controlled trials, interim analyses are often planned for possible early trial termination to claim superiority or futility of a new therapy. While unblinding is necessary to conduct the formal interim analysis in blinded studies, blinded data also have information about the potential treatment difference between the groups. We developed a blinded data monitoring tool that enables investigators to predict whether they observe such an unblinded interim analysis results that supports early termination of the trial. Investigators may skip some of the planned interim analyses if an early termination is unlikely. We specifically focused on blinded, randomized-controlled studies to compare binary endpoints of a new treatment with a control. Assuming one interim analysis is planned for early termination for superiority or futility, we conducted extensive simulation studies to assess the impact of the implementation of our tool on the size, power, expected number of interim analyses, and bias in the treatment effect. The numerical study showed the proposed monitoring tool does not affect size or power, but dramatically reduces the expected number of interim analyses when the effect of the treatment difference is small. The tool serves as a useful reference when interpreting the summary of the blinded data throughout the course of the trial, without losing integrity of the study. This tool could potentially save the study resources and budget by avoiding unnecessary interim analyses.

  14. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    Science.gov (United States)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  15. Qualification of old wastes for finale disposal; Qualifizierung von Altabfaellen fuer die Endlagerung

    Energy Technology Data Exchange (ETDEWEB)

    Dullau, R.; Kloeckner, J. [WTI Wissenschaftlich-Technische Ingenieurberatung GmbH, Juelich (Germany); Uekoetter, S. [GNS Gesellschaft fuer Nuklear-Service mbH, Essen (Germany)

    2010-05-15

    In the frame of the interim storage and final disposal of radioactive waste forms until now about 1200 barrels filled with old radioactive waste had to be requalified. The process of requalification is described in this contribution. The storage casks contained mainly high-pressure compacted and loose mixed waste, cemented waste and casting molds, building waste and combustion residuals, conditioned in the 1980ies. In the final repository Morsleben 80% of the waste forms were cleared for final disposal in Morsleben, 20% were qualified for interim storage and final disposal in the Schachtanlage Konrad. Based on these experiences the authors summarize recommendations for further requalification of old waste forms for the disposal in the Schachtanlage Konrad.

  16. The Nord interim store

    International Nuclear Information System (INIS)

    Leushacke, D.F.; Rittscher, D.

    1996-01-01

    In line with the decision taken in 1990 to shut down and decommission the Greifswald and Rheinsberg Nuclear Power Stations, the waste management concept of the Energiewerke Nord is based on direct and complete decommissioning of the six shut down reactor units within the next fifteen years. One key element of this concept is the construction and use of the Zwischenlager Nord (Nord Interim Store, ZLN) for holding the existing nuclear fuels and for interim and decay storage of the radioactive materials arising in decommissioning and demolition. The owner and operator of the store is Energiewerke Nord GmbH. The interim store has the functions of a processing and Energiewerke Nord GmbH. The interim store has the functions of a processing and treatment station and buffer store for the flows of residues arising. As a radioactive waste management station, it accommodates nuclear fuels, radioactive waste or residues which are not treated any further. It is used as a buffer store to allow the materials accumulating in disassembly to be stored temporarily before or after treatment in order to ensure continuous loading of the treatment plants. When operated as a processing station, the ZLN is able to handle nearly all types of radioactive waste and residues arising, except for nuclear fuels. These installations allow the treatment of radioactive residues to be separated from the demolition work both physically and in time. The possibilities of interium storage and buffer storage of untreated waste and waste packages make for high flexibility in logistics and waste management strategy. (orig.) [de

  17. Proposed amendment to the final decision document for the hydrazine blending and storage facility, interim response action

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-25

    From April through August 1989, a bench-/pilot-scale testing program was conducted to evaluate whether qualified manufactures of ultraviolet (UV)/chemical oxidation equipment could reduce the concentrations of hydrazine fuel compounds (hydrazine, monomethyl hydrazine (MMH), and unsymmetrical dimethyl hydrazine (UDMH)) and n-nitrosodimethylamine (NDMA) in the wastewater to action levels identified in the Final Decision Document. A secondary objective of this testing program was to generate design and operational information for use during the full-scale startup program.

  18. Conditioning of spent fuel for interim and final storage in the pilot conditioning plant (PKA) at Gorleben

    International Nuclear Information System (INIS)

    Lahr, H.; Willax, H.O.; Spilker, H.

    1999-01-01

    In 1994, due to the change of the nuclear law in Germany, the concept of direct final disposal for spent fuel was developed as an equivalent alternative to the waste management with reprocessing. Since 1979, tests for the direct final disposal of spent fuel have been conducted in Germany. In 1985, the State and the utilities came to an agreement to develop this concept of waste management to technical maturity. Gesellschaft fuer Nuklear-Service (GNS) was commissioned by the utilities with the following tasks: to develop and test components with regard to conditioning technology, to construct and operate the pilot conditioning plant (PKA), and to develop casks suitable for final disposal. Since 1990, the construction of the PKA has taken place at the Brennelementlager Gorleben site. The PKA has been designed as a multipurpose facility and can thus fulfil various tasks within the framework of the conditioning and management of spent fuel assemblies and radioactive waste. The pilot character of the plant allows for development and testing in the field of spent fuel assembly conditioning. The objectives of the PKA may be summarized as follows: to condition spent fuel assemblies, to reload spent fuel assemblies and waste packages, to condition radioactive waste, and to do maintenance work on transport and storage casks as well as on waste packages. Currently, the buildings of the PKA are constructed and the technical facilities are installed. The plant will be ready for service in the middle of 1999. It is the first plant of its kind in the world. (author)

  19. 78 FR 4160 - Federal Property Suitable as Facilities To Assist the Homeless

    Science.gov (United States)

    2013-01-18

    ... to the interim rule governing this program, 24 CFR part 581. For properties listed as suitable/to be... Status: Unutilized Comments: off-site removal only; 3,292 sf.; dining facility; good conditions...

  20. 78 FR 29147 - Federal Property Suitable as Facilities To Assist the Homeless

    Science.gov (United States)

    2013-05-17

    ..., the reader is encouraged to refer to the interim rule governing this program, 24 CFR part 581. For... Comments: off-site removal only; 13,493 sf.; dining facility; deteriorating; asbestos Building 07636...

  1. 76 FR 58790 - Notice of Interim Approval

    Science.gov (United States)

    2011-09-22

    ... to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third rate alternative... an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The third... allocated on an interim basis to the customers. Rate Scenario 3--Original Cumberland Marketing Policy The...

  2. Continuous Covariate Imbalance and Conditional Power for Clinical Trial Interim Analyses

    Science.gov (United States)

    Ciolino, Jody D.; Martin, Renee' H.; Zhao, Wenle; Jauch, Edward C.; Hill, Michael D.; Palesch, Yuko Y.

    2014-01-01

    Oftentimes valid statistical analyses for clinical trials involve adjustment for known influential covariates, regardless of imbalance observed in these covariates at baseline across treatment groups. Thus, it must be the case that valid interim analyses also properly adjust for these covariates. There are situations, however, in which covariate adjustment is not possible, not planned, or simply carries less merit as it makes inferences less generalizable and less intuitive. In this case, covariate imbalance between treatment groups can have a substantial effect on both interim and final primary outcome analyses. This paper illustrates the effect of influential continuous baseline covariate imbalance on unadjusted conditional power (CP), and thus, on trial decisions based on futility stopping bounds. The robustness of the relationship is illustrated for normal, skewed, and bimodal continuous baseline covariates that are related to a normally distributed primary outcome. Results suggest that unadjusted CP calculations in the presence of influential covariate imbalance require careful interpretation and evaluation. PMID:24607294

  3. Surface Water Interim Measures/Interim Remedial Action Plan/ Environmental and Decision Document, South Walnut Creek Basin, Operable Unit No.2

    International Nuclear Information System (INIS)

    1991-01-01

    Water quality investigations have identified the presence of volatile organic compound (VOC) and radionuclide contamination of surface water at the Rocky Flats Plant (RFP). The subject interim Measures/Interim Remedial Action Plan/Environmental Assessment (IM/IRAP/EA) addresses contaminated surface water in a portion of the South Walnut Creek drainage basin located within an area identified as Operable Unit No. 2 (OU 2). There is no immediate threat to public health and the environment posed by this surface water contamination. The affected surface water is contained within the plant boundary by existing detention ponds, and is treated prior to discharge for removal of volatile contaminants and suspended particulates to which radionuclides, if present, are likely to absorb. However, there is a potential threat and the Department of Energy (DOE) is implementing this Surface Water IM/IRAP at the request of the US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH). Implementation of the Surface Water IM/IRA will enhance the DOE's efforts towards containing and managing contaminated surface water, and will mitigate downgradient migration of contaminants. Another factor in implementing this IM/IRA is the length of time it will take to complete the investigations and engineering studies necessary to determine the final remedy for OU 2. 44 refs., 23 figs., 14 tabs

  4. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  5. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  6. Technology, safety and costs of decommissioning reference nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Elder, H.K.

    1986-05-01

    The radioactive wastes expected to result from decommissioning nuclear fuel cycle facilities are reviewed and classified in accordance with 10 CFR 61. Most of the wastes from the MOX plant (exclusive of the lagoon wastes) will require interim storage (11% Class A 49 m 3 ; 89% interim storage, 383 m 3 ). The MOX plant lagoon wastes are Class A waste (2930 m 3 ). All of the wastes from the U-Fab and UF 6 plants are designated as Class A waste (U-Fab 1090 m 3 , UF 6 1259 m 3 )

  7. FedEx Gasoline Hybrid Electric Delivery Truck Evaluation: 6-Month Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Barnitt, R.

    2010-05-01

    This interim report presents partial (six months) results for a technology evaluation of gasoline hybrid electric parcel delivery trucks operated by FedEx in and around Los Angeles, CA. A 12 month in-use technology evaluation comparing in-use fuel economy and maintenance costs of GHEVs and comparative diesel parcel delivery trucks was started in April 2009. Comparison data was collected and analyzed for in-use fuel economy and fuel costs, maintenance costs, total operating costs, and vehicle uptime. In addition, this interim report presents results of parcel delivery drive cycle collection and analysis activities as well as emissions and fuel economy results of chassis dynamometer testing of a gHEV and a comparative diesel truck at the National Renewable Energy Laboratory's (NREL) ReFUEL laboratory. A final report will be issued when 12 months of in-use data have been collected and analyzed.

  8. Preliminary design for hot dirty-gas control-valve test facility. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    This report presents the results of a preliminary design and cost estimating effort for a facility for the testing of control valves in Hot Dirty Gas (HDGCV) service. This design was performed by Mittelhauser Corporation for the United States Department of Energy's Morgantown Energy Technology Center (METC). The objective of this effort was to provide METC with a feasible preliminary design for a test facility which could be used to evaluate valve designs under simulated service conditions and provide a technology data base for DOE and industry. In addition to the actual preliminary design of the test facility, final design/construction/operating schedules and a facility cost estimate were prepared to provide METC sufficient information with which to evaluate this design. The bases, assumptions, and limitations of this study effort are given. The tasks carried out were as follows: METC Facility Review, Environmental Control Study, Gas Generation Study, Metallurgy Review, Safety Review, Facility Process Design, Facility Conceptual Layout, Instrumentation Design, Cost Estimates, and Schedules. The report provides information regarding the methods of approach used in the various tasks involved in the completion of this study. Section 5.0 of this report presents the results of the study effort. The results obtained from the above-defined tasks are described briefly. The turnkey cost of the test facility is estimated to be $9,774,700 in fourth quarter 1979 dollars, and the annual operating cost is estimated to be $960,000 plus utilities costs which are not included because unit costs per utility were not available from METC.

  9. Fast Flux Test Facility: the first three years, 1982-1985

    International Nuclear Information System (INIS)

    1985-01-01

    General information is provided concerning the Fast Flux Test Facility. Topics discussed include: mission and major accomplishments; background information; major construction milestones; acceptance testing; plant performance; plant operation; fuel performance; interim examination and maintenance cell; environmental effects; and future plans for the FFTF

  10. Success of Two-Stage Reimplantation in Patients Requiring an Interim Spacer Exchange.

    Science.gov (United States)

    George, Jaiben; Miller, Evan M; Curtis, Gannon L; Klika, Alison K; Barsoum, Wael K; Mont, Michael A; Higuera, Carlos A

    2018-03-23

    Some patients undergoing a 2-stage revision for a periprosthetic joint infection require a repeat spacer in the interim (removal of existing spacer with insertion of a new spacer or spacer exchange) due to persistent infection. The objectives of this study are to (1) determine the factors associated with patients who receive a repeat spacer and (2) compare the infection-free survival (overall and stratified by joint type) of reimplantation in patients who did or did not receive a repeat spacer. From 2001 to 2014, 347 hip or knee 2-stage revisions that finally underwent reimplantation and had a minimum 2-year follow-up were identified. An interim spacer exchange was performed in 59 (17%) patients (exchange cohort). Patient-related and organism-related factors were compared between the exchange and non-exchange cohorts. Kaplan-Meier survival curves were performed to assess the success (absence of signs of infection, reoperation for infection, periprosthetic joint infection-related mortality) of both cohorts. Patients in the exchange group had higher comorbidity score (P = .020), prolonged time to reimplantation (P exchange cohort, and 78% (knee 77%, hip 78%) in the non-exchange cohort (P = .020). Patients requiring an interim spacer exchange were found to have more comorbidities, prolonged treatment period, and were more likely to be infected with a resistant organism. About one-third of such patients became reinfected within 5 years compared to only one-fifth of the patients without an interim spacer exchange. Copyright © 2018 Elsevier Inc. All rights reserved.

  11. Medicare Program; Cancellation of Advancing Care Coordination Through Episode Payment and Cardiac Rehabilitation Incentive Payment Models; Changes to Comprehensive Care for Joint Replacement Payment Model: Extreme and Uncontrollable Circumstances Policy for the Comprehensive Care for Joint Replacement Payment Model. Final rule; interim final rule with comment period.

    Science.gov (United States)

    2017-12-01

    This final rule cancels the Episode Payment Models (EPMs) and Cardiac Rehabilitation (CR) Incentive Payment Model and rescinds the regulations governing these models. It also implements certain revisions to the Comprehensive Care for Joint Replacement (CJR) model, including: Giving certain hospitals selected for participation in the CJR model a one-time option to choose whether to continue their participation in the model; technical refinements and clarifications for certain payment, reconciliation and quality provisions; and a change to increase the pool of eligible clinicians that qualify as affiliated practitioners under the Advanced Alternative Payment Model (Advanced APM) track. An interim final rule with comment period is being issued in conjunction with this final rule in order to address the need for a policy to provide some flexibility in the determination of episode costs for providers located in areas impacted by extreme and uncontrollable circumstances.

  12. Mission Need Statement: Idaho Spent Fuel Facility Project

    Energy Technology Data Exchange (ETDEWEB)

    Barbara Beller

    2007-09-01

    Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

  13. Development of a Computer Program for an Analysis of the Logistics and Transportation Costs of the PWR Spent Fuels in Korea

    International Nuclear Information System (INIS)

    Cha, Jeong Hun; Choi, Heui Joo; Lee, Jong Youl; Choi, Jong Won

    2009-01-01

    It is expected that a substantial amount of spent fuels will be transported from the four nuclear power plant (NPP) sites in Korea to a hypothetical centralized interim storage facility or a final repository in the near future. The cost for the transportation is proportional to the amount of spent fuels. In this paper, a cost estimation program is developed based on the conceptual design of a transportation system and a logistics analysis. Using the developed computer program, named as CASK, the minimum capacity of a centralized interim storage facility (CISF) and the transportation cost for PWR spent fuels are calculated. The PWR spent fuels are transported from 4 NPP sites to a final repository (FR) via the CISF. Since NPP sites and the CISF are located along the coast, a sea-transportation is considered and a road-transportation is considered between the CISF and the FR. The result shows that the minimum capacity of the interim storage facility is 15,000 MTU

  14. An Approach for Evaluating the Technical Quality of Interim Assessments

    Science.gov (United States)

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  15. On the pathway towards disposal. The need for long-term interim storage of high-level nuclear waste; Auf dem Weg in die Endlagerung. Die Notwendigkeit der langfristigen Zwischenlagerung hoch radioaktiver Abfaelle

    Energy Technology Data Exchange (ETDEWEB)

    Budelmann, Harald; Koehnke, Dennis; Reichardt, Manuel [Technische Univ. Braunschweig (Germany). Inst. fuer Baustoffe, Massivbau und Brandschutz; Di Nucci, Maria Rosaria; Isidoro Losada, Ana Maria [Freie Univ. Berlin (Germany). Forschungszentrum fuer Umweltpolitik (FFU)

    2017-09-01

    The disposal of spent nuclear fuel is a still unsolved problem with social, ethical, economical, ecological and political dimensions. The stagnating decision process on the final repository concept in several countries has the consequence of the inclusion of long-term interim storage into the disposal concept. The contribution discusses several approaches. This opens the question whether the long-term interim storage is a matter of delaying tactic or a pragmatic solution on the way to a final repository.

  16. Special feature of the facilities for final disposal of radioactive waste and its potential impact on the licensing process

    International Nuclear Information System (INIS)

    Lee Gonzales, Horacio M.; Medici, Marcela A.; Alvarez, Daniela E.; Biaggio, Alfredo L.

    2009-01-01

    During the lifetime of a radioactive waste disposal facility it is possible to identify five stages: design, construction, operation, closure and post-closure. While the design, and pre-operation stages are, to some extent, similar to other kind of nuclear or radioactive facilities; construction, operation, closure and post-closure have quite special meanings in the case of radioactive waste disposal systems. For instance, the 'closure' stage of a final disposal facility seems to be equivalent to the commissioning stage of a conventional nuclear or radioactive facility. This paper describes the unique characteristics of these stages of final disposal systems, that lead to concluded that their licensing procedure can not be assimilated to the standard licensing procedures in use for other nuclear or radioactive facilities, making it necessary to develop a tailored license system. (author)

  17. Verification and validation interim report for portable 1,000 CFM exhauster skids POR-007/Skid E and POR-008/Skid F

    International Nuclear Information System (INIS)

    Nelson, O.D.

    1998-01-01

    This Verification and Validation (V/V) interim report summarizes to date the results of the V/V tasks performed in each of the following life cycle phases: concept, requirements, design, implementation, test, installation and checkout, and operation and maintenance. At the end of the installation and checkout phase, the V/V final report will be issued. This interim report contains or references the following for each phase: Description of V/V tasks performed; Summary of task results; Summary of anomalies and resolution; Assessment of system quality; Recommendations

  18. Final closure of a low level waste disposal facility

    International Nuclear Information System (INIS)

    Potier, J.M.

    1995-01-01

    The low-level radioactive waste disposal facility operated by the Agence Nationale pour la Gestion des Dechets Radioactifs near La Hague, France was opened in 1969 and is scheduled for final closure in 1996. The last waste package was received in June 1994. The total volume of disposed waste is approximately 525,000 m 3 . The site closure consists of covering the disposal structures with a multi-layer impervious cap system to prevent rainwater from infiltrating the waste isolation system. A monitoring system has been set up to verify the compliance of infiltration rates with hydraulic performance objectives (less than 10 liters per square meter and per year)

  19. Spent Fuel Long Term Interim Storage: The Spanish Policy

    International Nuclear Information System (INIS)

    Fernandez-Lopez, Javier

    2014-01-01

    ENRESA is the Spanish organization responsible for long-term management of all categories of radioactive waste and nuclear spent fuel and for decommissioning nuclear installations. It is also in charge of the management of the funds collected from waste producers and electricity consumers. The national policy about radioactive waste management is established at the General Radioactive Waste Plan by the Government upon proposal of the Ministry of Industry, Energy and Tourism. Now the Plan in force is the Sixth Plan approved in 2006. The policy on spent nuclear fuel, after description of the current available options, is set up as a long term interim storage at a Centralized Temporary Storage facility (CTS, or ATC in Spanish acronym) followed by geologic disposal, pending technological development on other options being eligible in the future. After a site selection process launched in 2009, the site for the ATC has been chosen at the end of 2011. The first steps for the implementation of the facility are described in the present paper. (authors)

  20. Facility Description 2012. Summary report of the encapsulation plant and disposal facility designs

    International Nuclear Information System (INIS)

    Palomaeki, J.; Ristimaeki, L.

    2013-10-01

    The purpose of the facility description is to be a specific summary report of the scope of Posiva's nuclear facilities (encapsulation plant and disposal facility) in Olkiluoto. This facility description is based on the 2012 designs and completing Posiva working reports. The facility description depicts the nuclear facilities and their operation as the disposal of spent nuclear fuel starts in Olkiluoto in about 2020. According to the decisions-in-principle of the government, the spent nuclear fuel from Loviisa and Olkiluoto nuclear power plants in operation and in future cumulative spent nuclear fuel from Loviisa 1 and 2, Olkiluoto 1, 2, 3 and 4 nuclear power plants, is permitted to be disposed of in Olkiluoto bedrock. The design of the disposal facility is based on the KBS-3V concept (vertical disposal). Long-term safety concept is based on the multi-barrier principle i.e. several release barriers, which ensure one another so that insufficiency in the performance of one barrier doesn't jeopardize long-term safety of the disposal. The release barriers are the following: canister, bentonite buffer and deposition tunnel backfill, and the host rock around the repository. The canisters are installed into the deposition holes, which are bored to the floor of the deposition tunnels. The canisters are enveloped with compacted bentonite blocks, which swell after absorbing water. The surrounding bedrock and the central and access tunnel backfill provide additional retardation, retention, and dilution. The nuclear facilities consist of an encapsulation plant and of underground final disposal facility including other aboveground buildings and surface structures serving the facility. The access tunnel and ventilation shafts to the underground disposal facility and some auxiliary rooms are constructed as a part of ONKALO underground rock characterization facility during years 2004-2014. The construction works needed for the repository start after obtaining the construction

  1. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  2. Water demand characteristics of shared water and sanitation facilities

    African Journals Online (AJOL)

    The provision of communal water and sanitation facilities has been mandated by the South African Government as an interim measure for informal settlement upgrading. These services form the first step in the upgrading process and are essential in meeting the basic needs of the community. The eThekwini municipality is ...

  3. Environmental assessment: Closure of the Waste Calcining Facility (CPP-633), Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1996-07-01

    The U.S. Department of Energy (DOE) proposes to close the Waste Calcining Facility (WCF). The WCF is a surplus DOE facility located at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering Laboratory (INEL). Six facility components in the WCF have been identified as Resource Conservation and Recovery Ace (RCRA)-units in the INEL RCRA Part A application. The WCF is an interim status facility. Consequently, the proposed WCF closure must comply with Idaho Rules and Standards for Hazardous Waste contained in the Idaho Administrative Procedures Act (IDAPA) Section 16.01.05. These state regulations, in addition to prescribing other requirements, incorporate by reference the federal regulations, found at 40 CFR Part 265, that prescribe the requirements for facilities granted interim status pursuant to the RCRA. The purpose of the proposed action is to reduce the risk of radioactive exposure and release of hazardous constituents and eliminate the need for extensive long-term surveillance and maintenance. DOE has determined that the closure is needed to reduce potential risks to human health and the environment, and to comply with the Idaho Hazardous Waste Management Act (HWMA) requirements

  4. Deployment of Radioactive Waste Disposal Facility with the Introduction of Nuclear Power Plants in Kenya

    Energy Technology Data Exchange (ETDEWEB)

    Shadrack, Antoony; Kim, Changlak [KEPCO International Nuclear Graduate School, Uljin (Korea, Republic of)

    2013-07-01

    The nuclear power program will inevitably generate radioactive wastes including low-and intermediate radioactive waste and spent fuel. These wastes are hazardous to human health and the environment and therefore, a reliable radioactive waste disposal facility becomes a necessity. This paper describes Kenya's basic plans for the disposal of radioactive wastes expected from the nuclear program. This plan is important as an initial implementation of a national Low to intermediate level wastes storage facility in Kenya. In Kenya, radioactive waste is generated from the use of radioactive materials in medicine, industry, education and research and development. Future radioactive waste is expected to arise from nuclear reactors, oil exploration, radioisotope and fuel production, and research reactors as shown in table 1. The best strategy is to store the LILW and spent fuel temporarily within reactor sites pending construction of a centralized interim storage facility or final disposal facility. The best philosophy is to introduce both repository and nuclear power programs concurrently. Research and development on volume reduction technology and conceptual design of disposal facility of LILW should be pursued. Safe management of radioactive waste is a national responsibility for sustainable generation of nuclear power. The republic of Kenya is set to become the second African nuclear power generation country after South Africa.

  5. Federal interim storage fee study for civilian spent nuclear fuel: a technical and economical analysis

    International Nuclear Information System (INIS)

    1983-07-01

    This report describes the study conducted by the Department of Energy (the Department) regarding payment charges for the federal interim storage (FIS) of spent fuel and presents the details of the study results. It describes the selection of a methodology for calculating a FIS fee schedule, sets forth the estimates of cost for construction and operation of FIS facilities, provides a range of estimates for the fee for FIS services, and identifies special contractual considerations associated with providing FIS services to authorized users. The fee is structured for a range of spent fuel capacities because of uncertainties regarding the schedule of availability and amount of spent fuel that may require and qualify for FIS. The results set forth in the report were used as a basis for development of the report entitled Payment Charges for Federal Interim Storage of Spent Nuclear Fuel from Civilian Nuclear Power Plants in the United States, dated July 1983

  6. Subsurface Interim Measures/Interim Remedial Action Plan/ Environmental Assessment and Decision Document, Operable Unit No. 2

    International Nuclear Information System (INIS)

    1992-01-01

    The subject Interim Measures/Interim Remedial Action plan/Environmental Assessment (IM/IRAP/EA) addresses residual free-phase volatile organic compound (VOC) contamination suspected in the subsurface within an area identified as Operable Unit No. 2 (OU2). This IM/IRAP/EA also addresses radionuclide contamination beneath the 903 Pad at OU2. Although subsurface VOC and radionuclide contamination on represent a source of OU2 ground-water contamination, they pose no immediate threat to public health or the environment. This volume contains five appendices

  7. Safety regulations for radioisotopes, etc. (interim report)

    International Nuclear Information System (INIS)

    1980-01-01

    An (interim) report by an ad hoc expert committee to the Nuclear Safety Commission, on the safety regulations for radioisotopes, etc., was presented. For the utilization of radioisotopes, etc., there is the Law Concerning Prevention of Radiation Injury Due to Radioisotopes, etc. with the advances in this field and the improvement in international standards, the regulations by the law have been examined. After explaining the basic ideas of the regulations, the problems and countermeasures in the current regulations are described: legal system, rationalization in permission procedures and others, inspection on RI management, the system of the persons in charge of radiation handling, RI transport, low-level radioactive wastes, consumer goods, definitions of RIs, radiation and sealed sources, regulations by group partitioning, RI facilities, system of personnel exposure registration, entrusting of inspection, etc. to private firms, and reduction in the works for permission among governmental offices. (author)

  8. 40 Years of Experience of NIRAS / Belgoprocess on the Interim Storage of Low, Intermediate and High Level Waste

    International Nuclear Information System (INIS)

    Braeckeveldt, Marnix; Ghys, Bart

    2016-01-01

    Conclusion: • ONDRAF/NIRAS and Belgoprocess have gained over time an extended experience on the interim storage of Low-Intermediate and High level waste. • An systematic inspection strategy was developed in order the verify the conformity of the different waste-packages and corrective measures were taken to guarantee safe storage conditions. • From 2022 , ONDRAF/NIRAS will operate a surface disposal facility for LLW

  9. CMM Interim Check Design of Experiments (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  10. E AREA LOW LEVEL WASTE FACILITY DOE 435.1 PERFORMANCE ASSESSMENT

    Energy Technology Data Exchange (ETDEWEB)

    Wilhite, E

    2008-03-31

    , situated immediately north of the Mixed Waste Management Facility. The E-Area Low-Level Waste Facility is comprised of 200 acres for waste disposal and a surrounding buffer zone that extends out to the 100-m point of compliance. Disposal units within the footprint of the low-level waste facilities include the Slit Trenches, Engineered Trenches, Component-in-Grout Trenches, the Low-Activity Waste Vault, the Intermediate-Level Vault, and the Naval Reactor Component Disposal Area. Radiological waste disposal operations at the E-Area Low-Level Waste Facility began in 1994. E-Area Low-Level Waste Facility closure will be conducted in three phases: operational closure, interim closure, and final closure. Operational closure will be conducted during the 25-year operation period (30-year period for Slit and Engineered Trenches) as disposal units are filled; interim closure measures will be taken for some units. Interim closure will take place following the end of operations and will consist of an area-wide runoff cover along with additional grading over the trench units. Final closure of all disposal units in the E-Area Low-Level Waste Facility will take place at the end of the 100-year institutional control period and will consist of the installation of an integrated closure system designed to minimize moisture contact with the waste and to serve as a deterrent to intruders. Radiological dose to human receptors is analyzed in this PA in the all-pathways analysis, the inadvertent intruder analysis and the air pathway analysis, and the results are compared to the relevant performance measures. For the all-pathways analysis, the performance measure of relevance is a 25-mrem/yr EDE to representative members of the public, excluding dose from radon and its progeny in air. For the inadvertent intruder, the applicable performance measures are 100-mrem/yr EDE and 500 mrem/yr EDE for chronic and exposure scenarios, respectively. The relevant performance measure for the air pathway is 10

  11. Interim FEP report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    Skagius, Kristina (ed.) [Kemakta Konsult AB, Stockholm (Sweden)

    2004-08-01

    level. This latter group of FEPs is also documented in the SR-Can version of the FEP database. The further processing of the initial state FEPs revealed that those FEPs that are not covered by the description of the repository design or by the site description, concern deviations from the intended initial state as a consequence of undetected mishaps, sabotage etc. These FEPs were propagated to the selection of scenarios. Relevant process FEPs from the audit were used to update the SR 97 set of internal processes for the engineered barrier system and the geosphere. The resulting SR-Can set of processes for the buffer are documented in the interim version of the SR-Can Process report and as process headings in the SR-Can interim version of the FEP database. Preliminary lists with SR-Can processes for the other system components are presently available in the interim version of the FEP database, but these lists will be further processed and documented in the final version of the SR-Can Process report. External FEPs from the audit were checked against the plans for managing these issues in SR-Can. Climate and large-scale geological FEPs were compared against the plans for modelling these phenomena and the handling of future human actions were compared to the handling in SR 97, which forms the basis for the handling in SR-Can. The coverage was found satisfactory. The results are not documented in the interim version of the SR-Can database, but will be so in the final version of the SR-Can database.

  12. Interim FEP report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    Skagius, Kristina

    2004-08-01

    level. This latter group of FEPs is also documented in the SR-Can version of the FEP database. The further processing of the initial state FEPs revealed that those FEPs that are not covered by the description of the repository design or by the site description, concern deviations from the intended initial state as a consequence of undetected mishaps, sabotage etc. These FEPs were propagated to the selection of scenarios. Relevant process FEPs from the audit were used to update the SR 97 set of internal processes for the engineered barrier system and the geosphere. The resulting SR-Can set of processes for the buffer are documented in the interim version of the SR-Can Process report and as process headings in the SR-Can interim version of the FEP database. Preliminary lists with SR-Can processes for the other system components are presently available in the interim version of the FEP database, but these lists will be further processed and documented in the final version of the SR-Can Process report. External FEPs from the audit were checked against the plans for managing these issues in SR-Can. Climate and large-scale geological FEPs were compared against the plans for modelling these phenomena and the handling of future human actions were compared to the handling in SR 97, which forms the basis for the handling in SR-Can. The coverage was found satisfactory. The results are not documented in the interim version of the SR-Can database, but will be so in the final version of the SR-Can database

  13. Spent fuel management in Canada

    International Nuclear Information System (INIS)

    Pattantyus, P.

    1998-01-01

    The current status of the Canadian Spent Fuel Management is described. This includes wet and dry interim storage, transportation issues and future plans regarding final disposal based on deep underground emplacement in stable granite rock. Extension of wet interim storage facilities is not planned, as dry storage technologies have found wide acceptance. (author)

  14. Evaluation of ERA-Interim precipitation data in complex terrain

    Science.gov (United States)

    Gao, Lu; Bernhardt, Matthias; Schulz, Karsten

    2013-04-01

    Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced

  15. 12 CFR 541.18 - Interim Federal savings association.

    Science.gov (United States)

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  16. Climate change : we are at risk : interim report

    International Nuclear Information System (INIS)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs

  17. Climate change : we are at risk : interim report

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, D.; Wiebe, J.

    2003-06-01

    Between November 2002 and May 2003 the Standing Senate Committee on Agriculture and Forestry travelled across Canada to hear the views of farmer organizations, rural associations, ecotourism groups and environmental organizations regarding concerns about climate change and the impact it may have on the agriculture and forestry sectors and rural communities. The Committee also examined potential adaptation strategies focusing on primary production, practices, technologies, ecosystems and other related areas. Farmers and forest operators are already facing changes in market conditions, domestic regulations, trade policies and technology. This interim report expressed the concerns of farmers and forest operators. It includes a review of the Saguenay flood of 1996, the Red River flood of 1997, the ice storm of 1998, and droughts since 1999. It also includes a discussion on climate change and its biophysical and economic effects on agriculture, forestry, water resources, rural communities, and Aboriginal communities. This interim report also briefly outlines the Kyoto Protocol, the emissions trading system, and the decarbonization of global energy systems. It emphasized the need for integrated research and government policies and programs that encourage adaptation to climate change. The final report will be released in October 2003 and will provide specific recommendations to ensure that Canada responds to the concerns of farmers and forest operators and to ensure continued prosperity in these sectors. refs., figs.

  18. 40 CFR 80.141 - Interim detergent gasoline program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Interim detergent gasoline program. 80... (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Detergent Gasoline § 80.141 Interim detergent gasoline... apply to: (i) All gasoline sold or transferred to a party who sells or transfers gasoline to the...

  19. Continuation of the summarizing interim report on previous results of the Gorleben site survey as of May 1983

    International Nuclear Information System (INIS)

    1990-04-01

    In addition to results from the 1983 interim report, this report contains, in order to supplement the surface explorations, seismic reflection measurements, hydrogeologic and seismologic investigations, sorption experiments, and studies of glacial development in the site region and of long-term safety of final waste repositories in salt domes. The site's high grade of suitability for becoming a final radioactive waste repository, the legal basis as well as quality assurance are evaluated. (orig.) [de

  20. Car drivers’ characteristics and the maximum walking distance between parking facilities and final destination

    NARCIS (Netherlands)

    van der Waerden, P.J.H.J.; Timmermans, H.J.P.; de Bruin - Verhoeven, M.

    2017-01-01

    In this paper the relationship between car drivers’ personal and trip characteristics and the maximum distance car drivers are willing to walk between a parking facility and the final destination(s) will be discussed. The willingness to walk is investigated in the context of four different trip

  1. Development of a mixed waste management facility at the Nevada Test Site

    International Nuclear Information System (INIS)

    Dodge, R.L.; Brich, R.F.

    1988-01-01

    The U.S. Department of Energy (DOE) produces radioactive low-level wastes (LLW) which contain hazardous components as identified by 40 Code of Federal Regulations (CFR) 261. Management of those mixed wastes (MW) requires compliance with U.S.Environmental Protection Agency (EPA) regulations for hazardous wastes and DOE regulations for LLW. In 1988, DOE's Nevada Operations Office (NV) began disposing of MW at the Nevada Test Site (NTS) under interim status as authorized by the state of Nevada. MW disposal is limited to Pit 3 while operating under interim status. This paper discusses how preparations for operation of a separate mixed waste management facility (MWMF) are underway. Those preparations include revising the NTS Part B Permit application, developing a MW certification program, developing and operating a vadose zone monitoring system, preparing an Environmental Assessment (EA), developing protocols for analysis of MW, and facility design and construction

  2. Conceptual design study of a concrete canister spent-fuel storage facility

    International Nuclear Information System (INIS)

    Lidfors, E.D.; Tabe, T.; Johnson, H.M.

    1979-01-01

    This report presents a conceptual design study for the interim storage of CANDU spent fuel in concrete canisters. The canisters will be concrete flasks, which contain fuel prepackaged in double steel containment, and will be cooled by natural air convection. This is one of the methods proposed as a potential alternative to water pool storage. A preliminary study of this concept was done by CAFS (Committee Assessing Fuel Storage), and WNRE (Whiteshell Nuclear Research Establishment) is currently conducting a development and demonstration program. This study of a central facility for the storage of all Canadian spent fuel arisings to the year 2000 was completed in 1975. A brief description of the facilities required and the operations involved, a summary of costs, a survey of the monitoring requirements and a prediction of the personnel exposures associated with this method of storing spent fuel are reported here. The estimated total cost of interim storage in cylindrical canisters at a central site is $6.02/kg U (1975 dollars). Approximately half of this cost is incurred in the shipment of fuel from the reactors to the storage facility. (author)

  3. Fabrication and operational experience with the interim storage cask

    International Nuclear Information System (INIS)

    Scott, P.L.

    1998-01-01

    This paper discusses the fabrication and operational experience of the Interim Storage Cask (ISC). The ISC is a dry storage cask which is used to safely store a Core Component Container (CCC) containing up to seven Fast Flux Test Facility (FFTF) spent fuel assemblies at the US Department of Energy's Hanford Site. Under contract to B and W Hanford Company (BWHC), General Atomics (GA) designed and fabricated thirty ISC casks which BWHC is remotely loading at the FFTF facility. BWHC designed and fabricated the CCCS. As of December 1997, thirty ISCs have been fabricated, of which eighteen have been loaded and moved to a storage site adjacent to the FFTF facility. Fabrication consisted of three sets of casks. The first unit was completed and acceptance tested before any other units were fabricated. After the first unit passed all acceptance tests, nine more units were fabricated in the first production run. Before those nine units were completed, GA began a production run of twenty more units. The paper provides an overview of the cask design and discusses the problems encountered in fabrication, their resolution, and changes made in the fabrication processes to improve the quality of the casks. The paper also discusses the loading process and operational experiences with loading and handling of the casks. Information on loading times, worker dose exposure, and total dose for loading are presented

  4. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    Science.gov (United States)

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  5. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  6. The final disposal facility of spent nuclear fuel

    International Nuclear Information System (INIS)

    Prvakova, S.; Necas, V.

    2001-01-01

    Today the most serious problem in the area of nuclear power engineering is the management of spent nuclear fuel. Due to its very high radioactivity the nuclear waste must be isolated from the environment. The perspective solution of nuclear fuel cycle is the final disposal into geological formations. Today there is no disposal facility all over the world. There are only underground research laboratories in the well developed countries like the USA, France, Japan, Germany, Sweden, Switzerland and Belgium. From the economical point of view the most suitable appears to build a few international repositories. According to the political and social aspect each of the country prepare his own project of the deep repository. The status of those programmes in different countries is described. The development of methods for the long-term management of radioactive waste is necessity in all countries that have had nuclear programmes. (authors)

  7. Choosing a spent fuel interim storage system

    International Nuclear Information System (INIS)

    Roland, V.; Hunter, I.

    2001-01-01

    The Transnucleaire Group has developed different modular solutions to address spent fuel interim storage needs of NPP. These solutions, that are present in Europe, USA and Asia are metal casks (dual purpose or storage only) of the TN 24 family and the NUHOMS canister based system. It is not always simple for an operator to sort out relevant choice criteria. After explaining the basic designs involved on the examples of the TN 120 WWER dual purpose cask and the NUHOMS 56 WWER for WWER 440 spent fuel, we shall discuss the criteria that govern the choice of a given spent fuel interim storage system from the stand point of the operator. In conclusion, choosing and implementing an interim storage system is a complex process, whose implications can be far reaching for the long-term success of a spent fuel management policy. (author)

  8. Development of the biosphere code BIOMOD: final report

    International Nuclear Information System (INIS)

    Kane, P.

    1983-05-01

    Final report to DoE on the development of the biosphere code BIOMOD. The work carried out under the contract is itemised. Reference is made to the six documents issued along with the final report. These consist of two technical notes issued as interim consultative documents, a user's guide and a programmer's guide to BIOMOD, a database description, program test document and a technical note entitled ''BIOMOD - preliminary findings''. (author)

  9. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Science.gov (United States)

    2013-11-12

    ...] Congestion Mitigation and Air Quality Improvement Program Interim Guidance AGENCY: Federal Highway... Comment. SUMMARY: The FHWA is issuing Interim Guidance on the Congestion Mitigation and Air Quality.../environment/air_quality/cmaq/policy_and_guidance/2008_guidance/ guidance/. DATES: This Interim Guidance is...

  10. 47 CFR 51.715 - Interim transport and termination pricing.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51.715 Section 51.715 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER... Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  11. Remote tool development at the Interim Examination and Maintenance (IEM) cell

    International Nuclear Information System (INIS)

    Kalk, J.J.

    1986-07-01

    Tightening fasteners remotely in a hot cell can be a very exasperating experience. In many places, viewing is difficult and work sometimes must be done using mirrors and/or cameras for viewing. If electromechanical manipulators are used, the operator has no ''feel'', which often can result in broken equipment. At the Interim Examination and Maintenance (IEM) Cell, where reactor components from the Fast Flux Test Facility (FFTF) are disassembled, several tools have been developed for tightening fasteners under these conditions. The philosophy used for this tool development is to use inexpensive commercially available tools with minimal modification for in-cell use. This philosophy was adopted after spending several years unsuccessfully trying to develop a special electric impact wrench

  12. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    International Nuclear Information System (INIS)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs

  13. Maywood Interim Storage Site environmental report for calendar year 1989, Maywood, New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    1990-05-01

    The environmental monitoring program, which began in 1984, was continued in 1989 at the Maywood Interim Storage Site (MISS), a US Department of Energy (DOE) facility located in the Borough of Maywood and the Township of Rochelle Park, New Jersey. MISS is currently used for storage of soils contaminated with low-level radioactivity. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials are present. The monitoring program at MISS measures thoron and radon concentrations in air; external gamma radiation levels; and thorium, uranium, and radium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. The radiation dose was calculated for a hypothetical maximally exposed individual to verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and to assess its potential effects on public health. This report presents the results of the environmental monitoring program conducted at the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) during calendar year 1989. Environmental monitoring began at MISS in 1984. 19 refs., 23 figs., 14 tabs.

  14. Sacramento Municipal Utility district's interim onsite storage building for low level radioactive waste

    International Nuclear Information System (INIS)

    Gillis, E.

    1986-01-01

    In order to meet current and anticipated needs for the low level radwaste management program at the Rancho Seco Nuclear Generating Station, the Sacramento Municipal Utility District has a design and construction program underway which will provide an onsite interim storage facility that can be expanded in two and one-half year increments. The design approach utilized allows capital investment to be minimized and still provides radwaste management flexibility in anticipation of delays in resolution of the nationwide long term radwaste disposal situation. The facility provides storage and material accountability for all low level radwastes generated by the plant. Wastes are segregated by radioactivity level and are stored in two separate storage areas located within one facility. Lower activity wastes are stored in a lightly shielded structure and handled by lift trucks, while the higher activity wastes are stored in a highly shielded structure and handled remotely by manual bridge crane. The layout of the structure provides for economy of operation and minimizes personnel radiation exposure. Design philosophy and criteria, building layout and systems, estimated costs and construction schedule are discussed

  15. Using optimization to improve radioactive waste interim storage

    International Nuclear Information System (INIS)

    Dellamano, J.C.; Sordi, G.M.

    2006-01-01

    In several countries where repository for final disposal is not constructed and in operation, the low level radioactive wastes are treated and stored. In some cases, interim storage can be extended for decades demanding special attention regarding security aspects. On the other hand, some packages contains very small quantities of radioactive material either by the long period of storage or by the rudimental segregation carried out when the radioactive waste were collected. This paper discuss the use of cost-benefit analysis as technique to aid decision making in order to evaluate the feasibility of to open the packages containing compactable solid radioactive wastes and to segregate these waste according to the classification that consider the recent clearance levels and exemption limits recommended by international organisms. (authors)

  16. Fire Hazard Analysis for the Cold Vacuum Drying facility (CVD) Facility

    CERN Document Server

    Singh, G

    2000-01-01

    The CVDF is a nonreactor nuclear facility that will process the Spent Nuclear Fuels (SNF) presently stored in the 105-KE and 105-KW SNF storage basins. Multi-canister overpacks (MCOs) will be loaded (filled) with K Basin fuel transported to the CVDF. The MCOs will be processed at the CVDF to remove free water from the fuel cells (packages). Following processing at the CVDF, the MCOs will be transported to the CSB for interim storage until a long-term storage solution can be implemented. This operation is expected to start in November 2000. A Fire Hazard Analysis (FHA) is required for all new facilities and all nonreactor nuclear facilities, in accordance with U.S. Department of Energy (DOE) Order 5480.7A, Fire Protection. This FHA has been prepared in accordance with DOE 5480.7A and HNF-PRO-350, Fire Hazard Analysis Requirements. Additionally, requirements or criteria contained in DOE, Richland Operations Office (RL) RL Implementing Directive (RLID) 5480.7, Fire Protection, or other DOE documentation are cite...

  17. Research reactor spent fuel management in Argentina

    International Nuclear Information System (INIS)

    Audero, M.A.; Bevilacqua, A.M.; Mehlich, A.M.; Novara, O.

    2002-01-01

    The research reactor spent fuel (RRSF) management strategy will be presented as well as the interim storage experience. Currently, low-enriched uranium RRSF is in wet interim storage either at reactor site or away from reactor site in a centralized storage facility. High-enriched uranium RRSF from the centralized storage facility has been sent to the USA in the framework of the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program. The strategy for the management of the RRSF could implement the encapsulation for interim dry storage. As an alternative to encapsulation for dry storage some conditioning processes are being studied which include decladding, isotopic dilution, oxidation and immobilization. The immobilized material will be suitable for final disposal. (author)

  18. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  19. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-transtetrahydrocannabinol (delta-9-THC)] in Schedule II. Interim final rule, with request for comments.

    Science.gov (United States)

    2017-03-23

    On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.

  20. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Jacobs

    2011-02-01

    1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.

  1. Ultraviolet Light Generation and Transport in the Final Optics Assembly of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Wegner, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hackel, L. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Feit, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Parham, T. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kozlowski, M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Whitman, P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-12

    The design of the National Ignition Facility (NIF) includes a Final Optics Assembly (FOA) subsystem for ultraviolet (UV) light generation and transport for each of the 192 beamlines. Analytical and experimental work has been done to help understand and predict the performance of FOA.

  2. Single-shell tank interim stabilization risk analysis

    International Nuclear Information System (INIS)

    Basche, A.D.

    1998-01-01

    The purpose of the Single-Shell Tank (SST) Interim Stabilization Risk Analysis is to provide a cost and schedule risk analysis of HNF-2358, Rev. 1, Single-Shell Tank Interim Stabilization Project Plan (Project Plan) (Ross et al. 1998). The analysis compares the required cost profile by fiscal year (Section 4.2) and revised schedule completion date (Section 4.5) to the Project Plan. The analysis also evaluates the executability of the Project Plan and recommends a path forward for risk mitigation

  3. The impact of a final disposal facility for spent nuclear fuel on a municipality's image

    International Nuclear Information System (INIS)

    Kankaanpaeae, H.; Haapavaara, L.; Lampinen, T.

    1999-02-01

    The study comprised on one hand a nationwide telephone interview (totally 800 interviews) aimed at mapping out the current image of possible host municipalities to a final disposal facility for spent nuclear fuel, and on the other hand some group interviews of people of another parish but of interest from the municipalities' point of view. The purpose of these group interviews was the same as that of the telephone interview, i.e. to find out what kind of an impact locating a final disposal facility of spent nuclear fuel in a certain municipality would have on the host municipality's image. Because the groups interviewed were selected on different grounds the results of the interviews are not fully comparable. The most important result of the study is that the current attitude towards a final disposal facility for spent nuclear fuel is calm and collected and that the matter is often considered from the standpoint of an outsider. The issue is easily ignored, classified as a matter 'which does not concern me', provided that the facility will not be placed too near one's own home. Among those interviewed the subject seemed not to be of any 'great interest and did not arouse spontaneous feelings for or against'. There are, however, deeply rooted beliefs concerning the facility and quite strong negative and positive attitudes towards it. The facility itself and the associated decision-making procedure arouse many questions, which at present to a large extent are still unexpressed because the subject is considered so remote. It is, however, necessary to give concrete answers to the questions because this makes it possible for people to relate the issue to daily life. It is further important that things arousing fear and doubts also can be discussed because a silence in this respect only emphasizes their importance. The attitude towards the facility is varying. On one hand there are economic and technical factors: the probable economic benefit from it, the obligation to

  4. Gaz de France interim financial report 2007

    International Nuclear Information System (INIS)

    2007-01-01

    This financial report contains the unaudited condensed financial statements of Gaz de France Group for the first half ended June 30, 2007, which were reviewed by the audit committee on August 27, 2007 and by the board of directors at its meeting on August 28, 2007. It includes forward-looking statements concerning the objectives, strategies, financial position, future operating results and the operations of Gaz de France Group. These statements reflect the Group's current perception of its activities and the markets in which it operates, as well as various estimates and assumptions considered to be reasonable. Content: interim management report (highlights of the first half of 2007, revenues and results for the period, financial structure, data on outstanding stock, outlook); interim consolidated financial statements (consolidated statements of income, consolidated balance sheets, consolidated statements of cash flows, recognized income and expenses, statements of changes in shareholders' equity, note to the consolidated financial statements); statement by the person responsible for the interim financial report; statutory auditors' report. (J.S.)

  5. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2018. Final rule.

    Science.gov (United States)

    2017-08-03

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2018 as required by the statute. As required by section 1886(j)(5) of the Social Security Act (the Act), this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2018. This final rule also revises the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM) diagnosis codes that are used to determine presumptive compliance under the "60 percent rule," removes the 25 percent payment penalty for inpatient rehabilitation facility patient assessment instrument (IRF-PAI) late transmissions, removes the voluntary swallowing status item (Item 27) from the IRF-PAI, summarizes comments regarding the criteria used to classify facilities for payment under the IRF PPS, provides for a subregulatory process for certain annual updates to the presumptive methodology diagnosis code lists, adopts the use of height/weight items on the IRF-PAI to determine patient body mass index (BMI) greater than 50 for cases of single-joint replacement under the presumptive methodology, and revises and updates measures and reporting requirements under the IRF quality reporting program (QRP).

  6. Cathodic Protection Field Trials on Prestressed Concrete Components, Final Report

    Science.gov (United States)

    1998-01-01

    This is the final report in a study to demonstrate the feasibility of using cathodic protection (CP) on concrete bridge structures containing prestressed steel. The interim report, FHWA-RD-95-032, has more details on the installation of selected CP s...

  7. Operation of spent fuel storage facilities

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Guide was prepared as part of the IAEA's programme on safety of spent fuel storage. This is for interim spent fuel storage facilities that are not integral part of an operating nuclear power plant. Following the introduction, Section 2 describes key activities in the operation of spent fuel storage facilities. Section 3 lists the basic safety considerations for storage facility operation, the fundamental safety objectives being subcriticality, heat removal and radiation protection. Recommendations for organizing the management of a facility are contained in Section 4. Section 5 deals with aspects of training and qualification; Section 6 describes the phases of the commissioning of a spent fuel storage facility. Section 7 describes operational limits and conditions, while Section 8 deals with operating procedures and instructions. Section 9 deals with maintenance, testing, examination and inspection. Section 10 presents recommendations for radiation and environmental protection. Recommendations for the quality assurance (QA) system are presented in Section 11. Section 12 describes the aspects of safeguards and physical protection to be taken into account during operations; Section 13 gives guidance for decommissioning. 15 refs, 5 tabs

  8. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  9. Safety assessment for spent fuel storage facilities

    International Nuclear Information System (INIS)

    1994-01-01

    This Safety Practice has been prepared as part of the IAEA's programme on the safety assessment of interim spent fuel storage facilities which are not an integral part of an operating nuclear power plant. This report provides general guidance on the safety assessment process, discussing both deterministic and probabilistic assessment methods. It describes the safety assessment process for normal operation and anticipated operational occurrences and also related to accident conditions. 10 refs, 2 tabs

  10. Cost studies concerning decontamination and dismantling. The interim store for spent fuel at Studsvik

    International Nuclear Information System (INIS)

    Sjoeblom, Rolf; Sjoeoe, Cecilia; Lindskog, Staffan; Cato, Anna

    2006-04-01

    The interim store for spent fuel at Studsvik was designed and constructed in 1962-64. It has been used for wet storage of fuel from the Aagesta Nuclear Power Plant as well as the R2 reactor at Studsvik. The interim store comprises three cylindrical pools for fuel storage as well as equipment for handling and decontamination. The purpose of the present work is to develop methodology for calculation of future costs for decontamination and dismantling of nuclear research facilities. The analysis is based on information from Studsvik as well as results from information searches. The requirements on precision of cost calculations is high, also at early stages. The reason for this is that the funds are to be collected now but are to be used some time in the future. At the same time they should neither be insufficient nor superfluous. It is apparent from the compilation and analysis that when methodology that has been developed for the purpose of cost calculations for power reactors is applied to research facilities certain drawbacks become apparent, e.g. difficulties to carry out variation analyses. Generally, feedback of data on incurred costs for the purpose of cost calculations can be achieved by using one or more scaling factors together with weighing factors which are established based on e.g. expert judgement. For development and utilisation of such tools it is necessary to have access to estimated costs together with incurred ones. In the report, the following combination of aspects is identified as being of primary significance for achieving a high precision: Calculations with the possibility to calibrate against incurred costs; Radiological surveying tailored to the needs for calculations; Technical planning including selection of techniques to be used; Identification of potential sources for systematic deviations. In the case of the interim store, some of the sources of uncertainty are as follows: Damaged surface layers in the pools; Maintenance status for the

  11. Experimental and Theoretical Progress of Linear Collider Final Focus Design and ATF2 Facility

    CERN Document Server

    Seryi, Andrei; Zimmermann, Frank; Kubo, Kiyoshi; Kuroda, Shigeru; Okugi, Toshiyuki; Tauchi, Toshiaki; Terunuma, Nobuhiro; Urakawa, Junji; White, Glen; Woodley, Mark; Angal-Kalinin, Deepa

    2014-01-01

    In this brief overview we will reflect on the process of the design of the linear collider (LC) final focus (FF) optics, and will also describe the theoretical and experimental efforts on design and practical realisation of a prototype of the LC FF optics implemented in the ATF2 facility at KEK, Japan, presently being commissioned and operated.

  12. Interim evaluation report on research and development of robots serviceable under extreme conditions; Kyokugen sagyo robot no kenkyu kaihatsu chukan hyoka hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    The research and development project for robots serviceable under extreme conditions are aimed at development of the robots for commercial nuclear power plants, where they are remotely controlled by the operators to implement advanced works, e.g., maintenance, inspection and repair of the facilities; supporting development of submarine oil fields, where they are remotely controlled by the operators to implement advanced works, e.g., maintenance, inspection and repair of the facilities; and for prevention of hazards at oil-producing plants, where they are remotely controlled by the operators to implement advanced works, e.g., controlling hazards, should they occur, and supporting hazard-preventive works. It is also aimed at development of the basic techniques for, e.g., those related to the system structures, and controlling and supporting the other systems. The project has been comprehensively evaluated for the achievements made so far. The individual elementary techniques for the robots for nuclear power plants, submarine oil field development and hazard prevention, and the basic techniques for these systems, are developed as planned as of the end of FY 1987 for the objects in the interim stage, based on the evaluation of the individual techniques developed before. Therefore, the bright prospects are obtained for achieving the final objectives by the end of the project period. (NEDO)

  13. Behavior of spent nuclear fuel and storage system components in dry interim storage.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, A.B. Jr.; Gilbert, E.R.; Guenther, R.J.

    1982-08-01

    Irradiated nuclear fuel has been handled under dry conditions since the early days of nuclear reactor operation, and use of dry storage facilities for extended management of irradiated fuel began in 1964. Irradiated fuel is currently being stored dry in four types of facilities: dry wells, vaults, silos, and metal casks. Essentially all types of irradiated nuclear fuel are currently stored under dry conditions. Gas-cooled reactor (GCR) and liquid metal fast breeder reactor (LMFBR) fuels are stored in vaults and dry wells. Certain types of fuel are being stored in licensed dry storage facilities: Magnox fuel in vaults in the United Kingdom and organic-cooled reactor (OCR) fuel in silos in Canada. Dry storage demonstrations are under way for Zircaloy-clad fuel from boiling water reactors BWR's, pressurized heavy-water reactors (PHWRs), and pressurized water reactors (PWRs) in all four types of dry storage facilities. The demonstrations and related hot cell and laboratory tests are directed toward expanding the data base and establishing a licensing basis for dry storage of water reactor fuel. This report reviews the scope of dry interim storage technology, the performance of fuel and facility materials, the status of programs in several countries to license dry storage of water reactor fuel, and the characteristics of water reactor fuel that relate to dry storage conditions.

  14. Behavior of spent nuclear fuel and storage-system components in dry interim storage

    International Nuclear Information System (INIS)

    Johnson, A.B. Jr.; Gilbert, E.R.; Guenther, R.J.

    1982-08-01

    Irradiated nuclear fuel has been handled under dry conditions since the early days of nuclear reactor operation, and use of dry storage facilities for extended management of irradiated fuel began in 1964. Irradiated fuel is currently being stored dry in four types of facilities: dry wells, vaults, silos, and metal casks. Essentially all types of irradiated nuclear fuel are currently stored under dry conditions. Gas-cooled reactor (GCR) and liquid metal fast breeder reactor (LMFBR) fuels are stored in vaults and dry wells. Certain types of fuel are being stored in licensed dry storage facilities: Magnox fuel in vaults in the United Kingdom and organic-cooled reactor (OCR) fuel in silos in Canada. Dry storage demonstrations are under way for Zircaloy-clad fuel from boiling water reactors BWR's, pressurized heavy-water reactors (PHWRs), and pressurized water reactors (PWRs) in all four types of dry storage facilities. The demonstrations and related hot cell and laboratory tests are directed toward expanding the data base and establishing a licensing basis for dry storage of water reactor fuel. This report reviews the scope of dry interim storage technology, the performance of fuel and facility materials, the status of programs in several countries to license dry storage of water reactor fuel, and the characteristics of water reactor fuel that relate to dry storage conditions

  15. 50 CFR 660.720 - Interim protection for sea turtles.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707...

  16. CMM Interim Check (U)

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  17. Medicare and Medicaid programs; physicians' referrals to health care entities with which they have financial relationships: partial delay of effective date. Interim final rule with comment period; partial delay in effective date.

    Science.gov (United States)

    2001-12-03

    This interim final rule with comment period delays for 1 year the effective date of the last sentence of 42 CFR 411.354(d)(1). Section 411.354(d)(1) was promulgated in the final rule entitled "Medicare and Medicaid Programs; Physicians' Referrals to Health Care Entities With Which They Have Financial Relationships," published in the Federal Register on January 4, 2001 (66 FR 856). A 1-year delay in the effective date of the last sentence in Section 411.354(d)(1) will give Department officials the opportunity to reconsider the definition of compensation that is "set in advance" as it relates to percentage compensation methodologies in order to avoid unnecessarily disrupting existing contractual arrangements for physician services. Accordingly, the last sentence of Section 411.354(d)(1), which would have become effective January 4, 2002, will not become effective until January 6,2003.

  18. Criteria for preparation and evaluation of radiological emergency response plans and preparedness in support of nuclear power plants. Interim report

    International Nuclear Information System (INIS)

    1980-01-01

    The purpose of this document is to provide a common reference and interim guidance source for: state and local governments and nuclear facility operators in the development of radiological emergency response plans and preparedness in support of nuclear power plants; and Nuclear Regulatory Commission (NRC), Federal Emergency Management Agency (FEMA) and other Federal agency personnel engaged in the review of state, local government, and licensee plans and preparedness

  19. Development of a unit cell model for interim performance assessment of vitrified low level waste disposal

    International Nuclear Information System (INIS)

    Kline, N.W.

    1995-09-01

    The unit cell modeling approach has been developed and used in analysis of some design options for a vitrified low level waste disposal facility. The unit cell modeling approach is likely to be useful in interim performance assessment for the facility. The present unit cell model will probably need to be refitted in terms of some model parameters for the latter purpose. Two present disposal facility concepts differ in the length of a capillary barrier proposed to limit effective recharge through the top of the facility. Results of the study summarized herein suggest design of a capillary barrier which can reduce a recharge rate of 0.1 cm/yr by one or two orders of magnitude seems feasible for both concepts. A benchmark comparison of the unit cell model against a full facility model shows comparable predictive accuracy in less than one percent of the computer time. Results suggest that model parameters include capillary barrier performance, inter-canister spacing, rate of moisture withdrawal due to glass corrosion, contaminant inventory, and the well interceptor factor. It is also important that variations of waste form hydraulic parameters suggest that transport through the waste form is dominated by diffusion

  20. Transport logistics for the transport of radioactive waste form public authorities to the final repository Konrad. Presentation of a simulation model

    International Nuclear Information System (INIS)

    Graffunder, Iris; Karbstein, Lutz

    2012-01-01

    The final repository Konrad will start operation in 2019. The licensed disposal amount of 303.000 m 3 is planned with 10.000 m 3 per year. The waste delivery can be performed by road or rail transport. The infrastructure boundary conditions have to be considered with the transport planning. The transport logistics concept is presented using the examples of the interim storage facilities Lubmin and Karlsruhe. The planned disposal regime for low- and intermediate-level wastes requires a comprehensive logistics concept that provides a delivery according to the schedule. The experience values from transport simulation experiments will be considered in the frame of the planning software EPALKO development as control function and optimization parameters.

  1. Operating a production facility without a CO and O agreement

    International Nuclear Information System (INIS)

    Smith, M. R.

    2000-01-01

    Issues that arise when an oil or natural gas facility is operated without a specific construction, ownership and operating (CO and O) agreement was explored. The lack of such an agreement may be due to the parties' inability to reach agreement, reliance on the land operating agreement, or the lack of diligent follow-up on the drafting, revision and execution of operating agreements. The paper examines the nature of ownership interests that obtain in the absence of a CO and O, the common situation in respect to CO and O agreements where the document has been circulated but has not been signed by the owners. A number of actual cases were cited to illustrate the effects of such an omission. It was concluded that ideally, a fully executed CO and O for each facility which deals specifically with the owners involved with the particular facility is the best of all worlds. However given the nature of some facilities, the expense, time and effort required to prepare and execute a separate CO and O, it is frequently omitted; in such situations it is convenient to fall back on the 1990 Operating Procedure of CAPL, which while general in nature and cannot adequately deal with every situation, deals with many common problems associated with the operation of facilities. It is recommended that even if a complete CO and O agreement cannot be executed, interim binding agreements should be used to avoid uncertainty until such time as a complete agreement can be finalized. A clause-by-clause comparison of the 1990 CAPL Operating Procedure and a 1996 model CO and O agreement, prepared by the Petroleum Joint Venture Association (PJVA), is appended

  2. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  3. Interim nuclear spent fuel storage facility - From complete refusal to public acceptance

    International Nuclear Information System (INIS)

    Kacena, Michal

    1998-01-01

    Full text: As usual in P.R., there was a complicated, politically sensitive situation we had to face at the beginning and it wasn't easy to create the right P.R. programme with the right targets: CEZ needed a new storage facility for the nuclear spent fuel from its two NPPs - Dukovany and Temelin. Firstly, CEZ preferred to build an on-site facility for the Dukovany NPP to last until the year 2004; secondly, a facility for the Temelin NPP several years later. But the Czech Government decided to limit Dukovany's storage capacity during a public discussion in 1992. Therefore, at the end of 1993, CEZ started the site selection process for a central storage facility targeted at ten regions in the country. In P.R. we decided on two main goals: 1. To gain public acceptance of a central storage facility at least at one site, and hopefully at more. 2. To change public opinion (especially around the Dukovany NPP) in order to create the proper atmosphere for changing the government's decision to limit storage capacity. We wanted to prove that we could choose the fight technical and economical solution without political limits. This obviously presented a challenge as it would be problematic for CEZ to be very visible in the campaign: We wanted people to know that the government had made a bad decision, but we also had to make it clear that our objections were based not on questions of momentary corporate advantage but instead on solid technical grounds. Most would only see self interest. We wanted to show them the facts. Of course, some times it wasn't easy to hit both targets at the same time. There was a lot of hard work in the middle. We gained new experience and we learned a lot trying to get public confidence in nuclear safety, in our company's reliability and in some local profits for a storage site: Firstly none of those regions was excited by the idea o a storage facility in its backyard. Most of them were very strongly and actively against it and did not want to

  4. ANALYSIS OF DOSE RATES DURING REPLACEMENT OF MANIPULATORS IN THE FFTF INTERIM EXAMINATION and MAINTENANCE (IEM) CELL

    International Nuclear Information System (INIS)

    NELSON, J.V.

    2002-01-01

    Replacement of a master-slave manipulator in the Interim Examination and Maintenance Cell at the Fast Flux Test Facility was carried out in August 2001. This operation created a 178-mm opening in the thick concrete wall of the hot cell. To aid in radiological work planning, dose rates outside the penetration in the wall were predicted using MCNP(trademark) photon transport calculations. The predicted dose rate was 7.7 mrem/h, which was reasonably close to the value of 10.4 mrem/h inferred from measurements

  5. Environmental information document defense waste processing facility

    International Nuclear Information System (INIS)

    1981-07-01

    This report documents the impact analysis of a proposed Defense Waste Processing Facility (DWPF) for immobilizing high-level waste currently being stored on an interim basis at the Savannah River Plant (SRP). The DWPF will process the waste into a form suitable for shipment to and disposal in a federal repository. The DWPF will convert the high-level waste into: a leach-resistant form containing above 99.9% of all the radioactivity, and a residue of slightly contaminated salt. The document describes the SRP site and environs, including population, land and water uses; surface and subsurface soils and waters; meteorology; and ecology. A conceptual integrated facility for concurrently producing glass waste and saltcrete is described, and the environmental effects of constructing and operating the facility are presented. Alternative sites and waste disposal options are addressed. Also environmental consultations and permits are discussed

  6. ITER interim design report package and relevant documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication documents the technical basis which underlay the Interim Design Report, Cost Review and Safety Analysis submitted to the ITER Councils (IC-8 and IC-9) Records of decisions and the ''ITER Interim Design Report Package''. This publication contains ITER Site Requirements and ITER Site Design Assumptions, TAC-8 Report, SRG Report, CP's Report on Tentative Sequence of Events and Parties' Views on the IDR Package and Parties' Technical Comments on the IDR Package. Figs, tabs

  7. Presidential Transition: The Experience of Two Community College Interim Presidents

    Science.gov (United States)

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  8. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  9. Calculation of radiation exposure of the environment of interim storage facilities for the dry storage of spent fuel in dual-purpose casks

    Energy Technology Data Exchange (ETDEWEB)

    Wortmann, B.; Stratmann, W. [STEAG Encotec GmbH, Essen (Germany)

    2004-07-01

    Acceptance problems in the public concerning the transport of spent nuclear fuel elements and a new political objective of the Federal Government have forced the German utilities to embark on on-site interim storage projects for the temporary storage of spent nuclear fuel elements. STEAG encotec GmbH, Essen, Germany, was awarded contracts for the conceptual planning including necessary shielding calculations for the majority of the 13 nuclear sites which opted for the dry storage concept. The capacity of the storage facilities ranges from 80 to 100 casks, according to the storage needs of the plants. The average dose rate at the surface of each cask was limited to 0.5 mSv/h, independent of the type of radiation. These new buildings should not significantly increase the exposure of the public to radiation already originating from the existing nuclear power plant. The layout of the storage building therefore has to ensure that additional target values of 10-20 iSv/y are not exceeded. These very low target values as well as the requirement to avoid high mechanical impacts to the casks in case of external events led to a thickness of walls and ceilings of between 1.2 m and 1.3 m. To remove the decay heat from the casks by natural convection sufficient cross sections of the air inlet and outlet ducts are required.

  10. Feasibility study to develop BNCT facility at the Indonesian research reactor

    International Nuclear Information System (INIS)

    Hastowo, H.

    2001-01-01

    A survey on the Indonesian research reactors and its supporting facilities has been done in order to check the possibility to install BNCT facility. Oncologists from several hospitals have been informing about the BNCT treatment for tumours and they give a positive response to support utilisation of the BNCT facility. Several aspects required to support the BNCT treatment have also been identified and related activities on that matter soon will be initiated. The interim result in our survey indicated that utilisation of the 30 MW Multipurpose reactor would not be possible from the technical point of view. Further study will be concentrated on the TRIGA reactor and an epithermal neutron beam facility at the thermal column of this reactor will be designed for further work. (author)

  11. Interim Consequence Management Guidance for a Wide-Area Biological Attack

    Energy Technology Data Exchange (ETDEWEB)

    Raber, Ellen [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kirvel, Robert [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); MacQueen, Don [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Love, Adam [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dombroski, Matthew [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); McGrann, Thomas [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Richards, John [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Melius, Carl [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bunt, Thomas [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hibbard, Wilthea [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Greenwalt, Robert [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Miles, Robin [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Dillon, Michael [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Mancieri, Sav [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Harris, Steve [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Michalik, Richard [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wheeler, Richard [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Hoppes, Bill [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Tucker, Mark [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Krauter, Paula [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knowlton, Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Yang, Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Franco, Dave [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Einfeld, Wayne [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Brockman, John [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Betty, Rita [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2011-05-17

    The Interagency Biological Restoration Demonstration (IBRD) program is a collaborative, interagency effort co-chaired by the Department of Homeland Security and Department of Defense aimed at improving the nation‘s ability to respond to and recover from a large-scale, wide-area, domestic attack involving the release of an environmentally persistent biological warfare agent. The program is focused on understanding interactions between the civilian and military sectors, and in building mutual support to carry out such remediations. This Interim Consequence Management Guidance document provides guidance for decisionmakers in executing activities required to respond to and recover from a biological incident affecting a wide urban area insofar as information is currently available. The spore-forming bacterium Bacillus anthracis is discussed as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the key threat agents. Most other biological threat agents are much easier to remediate, and in many cases, inactivation would occur naturally within days as a result of environmental exposure; however, the framework and operational questions that need to be addressed are expected to remain the same. The guidance in this document is applicable to (1) enclosed facilities, such as commercial, residential, and continental U.S. military facilities; (2) semi-enclosed facilities, such as subways and public transit facilities; (3) outdoor areas (both localized and wide area), such as building exteriors, streets, parks, and other open spaces; (4) drinking water facilities; and (5) drinking water sources. This document follows an interagency framework [Planning Guidance for Recovery Following Biological Incidents (DHS and EPA 2009)]—which considered Raber et al. (2002) in its development—but takes the framework to a more operational level and provides guidance at key action and decision

  12. Occupational radiation dose assessment for a non site specific spent fuel storage facility

    International Nuclear Information System (INIS)

    Hadley, J.; Eble, R.G. Jr.

    1997-01-01

    To expedite the licensing process of the non site specific Centralized Interim Storage Facility (CISF) the Department of Energy has completed a phase I CISF Topical Safety Analysis Report (TSAR). The TSAR will be used in licensing the phase I CISF if a site is designated. An occupational radiation does assessment of the facility operations is performed as part of the phase I CISF design. The first phase of the CISF has the capability to receive, transfer, and store SNF in dual-purpose cask/canister systems (DPC's). Currently there are five vendor technologies under consideration. The preliminary dose assessment is based on estimated occupational exposures using traditional power plant ISFSI and transport cask handling processes. The second step in the process is to recommend ALARA techniques to reduce potential exposures. A final dose assessment is completed implementing the ALARA techniques and a review is performed to ensure that the design is in compliance with regulatory criteria. The dose assessment and ALARA evaluation are determined using the following input information: Dose estimates from vendor SAR's; ISFSI experience with similar systems; Traditional methods of operations; Expected CISF cask receipt rates; and feasible ALARA techniques. 5 refs., 1 tab

  13. Lessons for outsourcing and interim management relationships.

    Science.gov (United States)

    Macko, W; Kostyack, P T

    1999-01-01

    Few decisions can affect an organization more than the selection of an outsourcing or interim management partner. More and more health care organizations face such decisions in today's competitive market in order to face new business needs. Making these relationships successful can be important for health care organizations seeking competitive advantages or seeking immediately accessible management support. These relationships, however, require careful partner selection and development. Success in outsourcing and interim management relationships is contingent upon a thorough selection process, a strong contract that has clearly and explicitly detailed responsibilities and a culture-sensitive business rapport between the client and selected partner.

  14. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    Science.gov (United States)

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  15. Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)

    International Nuclear Information System (INIS)

    COVEY, L.I.

    2000-01-01

    The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will have been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, 90 Sr and 137 Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the 137 Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF

  16. Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)

    Energy Technology Data Exchange (ETDEWEB)

    COVEY, L.I.

    2000-11-28

    The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will have been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, {sup 90}Sr and {sup 137}Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the {sup 137}Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.

  17. Interim Report by Asia International Grid Connection Study Group

    Science.gov (United States)

    Omatsu, Ryo

    2018-01-01

    The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.

  18. Consultation Report. Consultation under the Environmental Act sixth chapter 4 paragraph for interim storage, encapsulation and disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    2010-09-01

    This consultation report is an appendix to the Environmental Impact Assessment (EIA) which in turn is an appendix to SKB's application under the Environmental Code for the continued operation of CLAB (Central interim storage for spent Nuclear Fuel, located on the Simpevarp Peninsula in Oskarshamn municipality), to build the encapsulation plant and operate it integrated with CLAB and to construct and operate the disposal facility in Soederviken at Forsmark in Oesthammar municipality, and SKB's application for a license under the Nuclear Activities Act to construct and operate the disposal facility at Forsmark. The aim of the consultation report is to give an overall picture of the consultations

  19. Effect of lymphedema treatment. The interim report of prospective study at multiple facilities

    International Nuclear Information System (INIS)

    Hamamoto, Takako; Ogata, Minako; Satoh, Kayoko; Ashino, Yoshikazu

    2009-01-01

    We are in the process of analyzing the effect of complex physical therapy (CPT) for the patients of secondary lymphedema associated with cancer treatment. At this time, we present an interim report of the past 3 months started in March 2009. We classified the lymphedema stage into four stages based on the International Society of Lymphology criterion using the imaging diagnosis (ultrasonography (US), CT, etc.) in addition to a conventional observation. We also classified the CPT treatment period into two in accordance with water retention in the subcutaneous adipose tissue of the limbs. CPT was performed by the specialist of lymphedema treatment. We used the change in volume of limbs and quality of life (QOL) evaluation by SF-36 and Skindex29 for analysis. On this report, the volume of limbs, which has lymphedema and an improvement on SF-36, did not change significantly. This may have been resulted from not having enough follow-up period and lack of few cases at each stage in the analysis. However, we confirmed that the general and emotion evaluation on Skindex29 showed a meaningful change. We are still planning to accumulate more cases and study them for further detailed analysis. (author)

  20. Does the radiation from the interim storage in Gorleben affect the sex ratio of newborn children?; Beeinflusst die Strahlung aus dem Zwischenlager in Gorleben das Geschlechterverhaeltnis von Neugeborenen?

    Energy Technology Data Exchange (ETDEWEB)

    Engelmann, H.W.; Schulze, H.; Wede, S. [GNS Gesellschaft fuer Nuklear-Service mbH, Gorleben (Germany); Mueller, S. [Studsvik GmbH, Pforzheim (Germany)

    2015-07-01

    In the professional world but especially in public, the question is discussed whether ionizing radiation from nuclear facilities has a significant impact on the secondary sex ratio of newborn children in the vicinity of the plants. This issue is of exceptional importance in the region around Gorleben, where the opposition to nuclear facilities and activities for decades is particularly strong. At the site borders of the interim storage facility (TBL-G) of GNS the effective individual dose is about 0.2 mSv per year, mainly caused by neutron irradiation from 108 casks with high-level radioactive waste from reprocessing. In the surrounding villages there is no radiation measurable. Statistical studies allegedly have shown evidence that in some villages in the area and during certain periods, proportionately fewer girls were born in comparison to the average for the Federal Republic of Germany. Based on these purely statistical results henceforward was also alleged that neutron-induced secondary effects such as activation or secondary gamma radiation would be responsible for it. Monte Carlo calculations and special measurements yielded values of the dose at the plant border for activation products less than E-04 mSv/a and for secondary gamma radiation of about E-03 mSv/a. These results indicate that the ionizing radiation from the Gorleben interim storage facility cannot be held accountable for shifts of the secondary sex ratio.

  1. The Interim Financial Reporting in the Spirit of the IAS 34 Norm

    OpenAIRE

    Ovidia Doinea

    2008-01-01

    The role of an interim financial reporting is to allow the information users to acknowledge the activity of an entity on period shorter than financial exercise from the perspective of the available profits and cash flows generated as well as from the point of view of its financial position and liquidity. The interim financial reporting includes a complete or condensed set of financial statements which target to update the last financial reporting, usually the annual report. The interim financ...

  2. [The history of the Kaiser Wilhelm Society during the Third Reich. Interim reports of the president's commission of the Max Planck Society].

    Science.gov (United States)

    Weber, M M

    2002-11-01

    In 1997 the Max Planck Society set up a presidential commission to do research on the historical development of its precursor organization, the Kaiser Wilhelm Society (KWG), during the Third Reich. This paper presents some of the important results given in the interim reports of this commission that are relevant to psychiatry. It focuses on brain research, anthropology, psychiatric genetics, and the role of the well-known biochemist Adolf Butenandt. In general, the interim reports reflect the numerous links between the biomedical research of the KWG and the institutions of the National Socialist (Nazi) state. However, they do not yet allow a final historical assessment as to the complex situation of this field of research during National Socialism.

  3. Waste Encapsulation and Storage Facility (WESF) Waste Analysis Plan

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    2000-01-01

    The purpose of this waste analysis plan (WAP) is to document waste analysis activities associated with the Waste Encapsulation and Storage Facility (WESF) to comply with Washington Administrative Code (WAC) 173-303-300(1), (2), (3), (4), (5), and (6). WESF is an interim status other storage-miscellaneous storage unit. WESF stores mixed waste consisting of radioactive cesium and strontium salts. WESF is located in the 200 East Area on the Hanford Facility. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  4. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  5. Department of the Navy final environmental impact statement for a container system for the management of naval spent nuclear fuel

    International Nuclear Information System (INIS)

    1996-11-01

    This Final Environmental Impact Statement (EIS) addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. This EIS describes environmental impacts of (1) producing and implementing the container systems (including those impacts resulting from the addition of the capability to load the containers covered in this EIS in dry fuel handling facilities at Idaho National Engineering Laboratory (INEL)); (2) loading of naval spent nuclear fuel at the Expended Core Facility or at the Idaho Chemical Processing Plant with subsequent storage at INEL; (3) construction of a storage facility (such as a paved area) at alternative locations at INEL; and (4) loading of containers and their shipment to a geologic repository or to a centralized interim storage site outside the State of Idaho once one becomes available. As indicated in the EIS, the systems and facilities might also be used for handling low-level radiological waste categorized as special case waste. The Navy's preferred alternative for a container system for the management of naval spent fuel is a dual-purpose canister system. The primary benefits of a dual-purpose canister system are efficiencies in container manufacturing and fuel reloading operations, and potential reductions in radiation exposure

  6. Batch-wise final disposal made feasible by long-term interim storage of waste: the choice of the Netherlands

    International Nuclear Information System (INIS)

    Codee, Hans D.K.; Vrijen, Jan

    1991-01-01

    Radioactive waste produced in the Netherlands is managed by COVRA, the Central Organisation for Radioactive Waste. All kinds and categories of radwaste generated in the next 50-100 years will be stored in above ground engineered structures which allow retrieval at all times. After this long-term storage, the wastes will finally be disposed of in a deep geologic repository. At the political level no firm decisions have yet been taken with respect to the final disposal. Disposal in rock salt, which is available in the Netherlands, is explored as an option. Immediate disposal requires the availability of a large amount of money as well as a site. Neither of the two are available at present in the Netherlands, nor are they required at this time. Based on economic considerations, immediate disposal into a rock salt facility in not an acceptable option for the wastes presently produced in the Netherlands. Only after sufficient capital has been generated through an interest bearing fund can this option be considered for implementation

  7. The AGP-Project conceptual design for a Spanish HLW final disposal facility

    International Nuclear Information System (INIS)

    Biurrun, E.; Engelmann, H.-J.; Huertas, F.; Ulibarri, A.

    1992-01-01

    Within the framework of the AGP Project a Conceptual Design for a HLW Final Disposal Facility to be eventually built in an underground salt formation in Spain has been developed. The AGP Project has the character of a system analysis. In the current project phase I several alternatives has been considered for different subsystems and/or components of the repository. The system variants, developed to such extent as to allow a comparison of their advantages and disadvantages, will allow the selection of a reference concept, which will be further developed to technical maturity in subsequent project phases. (author)

  8. Payment or Reimbursement for Certain Medical Expenses for Camp Lejeune Family Members. Final rule.

    Science.gov (United States)

    2017-05-05

    The Department of Veterans Affairs (VA) adopts as final an interim final rule addressing payment or reimbursement of certain medical expenses for family members of Camp Lejeune veterans. Under this rule, VA reimburses family members, or pays providers, for medical expenses incurred as a result of certain illnesses and conditions that may be associated with contaminants present in the base water supply at U.S. Marine Corps Base Camp Lejeune (Camp Lejeune), North Carolina, from August 1, 1953, to December 31, 1987. Payment or reimbursement is made within the limitations set forth in statute and Camp Lejeune family members receive hospital care and medical services that are consistent with the manner in which we provide hospital care and medical services to Camp Lejeune veterans. The statutory authority has since been amended to also include certain veterans' family members who resided at Camp Lejeune, North Carolina, for no less than 30 days (consecutive or nonconsecutive) between August 1, 1953, and December 31, 1987. This final rule will reflect that statutory change and will address public comments received in response to the interim final rule.

  9. Massachusetts Large Blade Test Facility Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rahul Yarala; Rob Priore

    2011-09-02

    Project Objective: The Massachusetts Clean Energy Center (CEC) will design, construct, and ultimately have responsibility for the operation of the Large Wind Turbine Blade Test Facility, which is an advanced blade testing facility capable of testing wind turbine blades up to at least 90 meters in length on three test stands. Background: Wind turbine blade testing is required to meet international design standards, and is a critical factor in maintaining high levels of reliability and mitigating the technical and financial risk of deploying massproduced wind turbine models. Testing is also needed to identify specific blade design issues that may contribute to reduced wind turbine reliability and performance. Testing is also required to optimize aerodynamics, structural performance, encourage new technologies and materials development making wind even more competitive. The objective of this project is to accelerate the design and construction of a large wind blade testing facility capable of testing blades with minimum queue times at a reasonable cost. This testing facility will encourage and provide the opportunity for the U.S wind industry to conduct more rigorous testing of blades to improve wind turbine reliability.

  10. Commentary: Interim leadership of academic departments at U.S. medical schools.

    Science.gov (United States)

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  11. Licensing of spent fuel storage facility including its physical protection in the Czech Republic

    International Nuclear Information System (INIS)

    Fajman, V.; Sedlacek, J.

    1992-01-01

    The current spent fuel management policies as practised in the Czech Republic are described, and the conception of the fuel cycle back end is outlined. The general principles and the legislative framework are explained of the licensing process concerning spent fuel interim storage facilities, including the environmental impact assessment component. The history is outlined of the licensing process for the spent fuel storage facility at the Dukovany NPP site, including the licensing of the transport and storage cask. The basic requirements placed on the physical safeguarding of the facility and on the licensing process are given. (J.B.). 13 refs

  12. Software Verification and Validation Report for the 244-AR Vault Interim Stabilization Ventilation System

    International Nuclear Information System (INIS)

    YEH, T.

    2002-01-01

    This document reports on the analysis, testing and conclusions of the software verification and validation for the 244-AR Vault Interim Stabilization ventilation system. Automation control system will use the Allen-Bradley software tools for programming and programmable logic controller (PLC) configuration. The 244-AR Interim Stabilization Ventilation System will be used to control the release of radioactive particles to the environment in the containment tent, located inside the canyon of the 244-AR facility, and to assist the waste stabilization efforts. The HVAC equipment, ducts, instruments, PLC hardware, the ladder logic executable software (documented code), and message display terminal are considered part of the temporary ventilation system. The system consists of a supply air skid, temporary ductwork (to distribute airflow), and two skid-mounted, 500-cfm exhausters connected to the east filter building and the vessel vent system. The Interim Stabilization Ventilation System is a temporary, portable ventilation system consisting of supply side and exhaust side. Air is supplied to the containment tent from an air supply skid. This skid contains a constant speed fan, a pre-filter, an electric heating coil, a cooling coil, and a constant flow device (CFD). The CFD uses a passive component that allows a constant flow of air to pass through the device. Air is drawn out of the containment tent, cells, and tanks by two 500-cfm exhauster skids running in parallel. These skids are equipped with fans, filters, stack, stack monitoring instrumentation, and a PLC for control. The 500CFM exhaust skids were fabricated and tested previously for saltwell pumping activities. The objective of the temporary ventilation system is to maintain a higher pressure to the containment tent, relative to the canyon and cell areas, to prevent contaminants from reaching the containment tent

  13. K basins interim remedial action health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  14. Factors relevant to the sealing of nuclear facilities

    International Nuclear Information System (INIS)

    1991-05-01

    This report reviews and summaries the factors to be considered in the design, construction and surveillance of confinement structures for damaged nuclear facilities. General engineering, design and environmental considerations are included, both from the standpoint of the mitigation of near-term effects by virtue of interim confinement, and from the standpoint of the acceptability of the structure for long-term confinement. Factors which influence optimization of the design and the construction sequence are reviewed, including the nature of the accident, natural conditions of the site, and thermal and radiation effects. Safety criteria are presented from the standpoint of regulatory requirements, radiological consequences, and monitoring/surveillance requirements for both interim and long-term confinement. Methodologies related to concrete fabrication technology and other construction techniques appropriate for building confinement structures are discussed. Long-term considerations relative to the future of the site for in-place storage/disposal of the waste, and possible future reuse of the site are also included

  15. Hydrazine Blending and Storage Facility, Interim Response Action Implementation. Final Safety Plan

    Science.gov (United States)

    1989-08-30

    unconsciousness Q - vomiting R - weakness S - anorexia T - temperature sensitivity f. Solubility of metals depends on the compound in which they are present...ano sKIn aosorption (acute or chronic). Zariv systemic effec:s from chronic excessive exoosure include anorexia , weight lcss, weakness’& tremors...related) have teen associate^- witn’ innaalazion exposure -a asoescos particles. (Crocidolize asbestos has been suggested as the major meso- in zrcuos o

  16. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    International Nuclear Information System (INIS)

    CALMUS, R.B.

    1999-01-01

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward

  17. Interim Action Proposed Plan for the old radioactive waste burial ground (643-E)

    International Nuclear Information System (INIS)

    McFalls, S.

    1995-12-01

    This Interim Action Proposed (IAPP) is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this IAPP is to describe the preferred interim remedial action for addressing the Old Radioactive Waste Burial Ground (ORWBG) unit located in the Burial Ground Complex (BGC) at the Savannah River Site (SRS) in Aiken, South Carolina. On December 21, 1989, SRS was included on the National Priorities List (NPL). In accordance with Section 120 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), DOE has negotiated a Federal Facility Agreement (FFA, 1993) with EPA and SCDHEC to coordinate remedial activities at SRS. Public participation requirements are listed in Sections 113 and 117 of CERCLA. These requirements include establishment of an Administrative Record File that documents the selection of remedial alternatives and allows for review and comment by the public regarding those alternatives. The SRS Public Involvement Plan (PIP) (DOE, 1994) is designed to facilitate public involvement in the decision-making process for permitting closure, and the selection of remedial alternatives. Section 117(a) of CERCLA, 1980, as amended, requires publication of a notice of any proposed remedial action

  18. Review of SKB's interim report of SR-Can: SKI's and SSI's evaluation of SKB's up-dated methodology for safety assessment

    International Nuclear Information System (INIS)

    Dverstorp, Bjoern; Moberg, Leif; Wiebert, Anders; Xu Shulan; Stroemberg, Bo; Kautsky, Fritz; Lilja, Christina; Simic, Eva; Sundstroem, Benny; Toverud, Oeivind

    2005-07-01

    This report presents the findings of a review of the Swedish Nuclear Fuel and Waste Management Co.'s (SKB) interim report of the safety assessment SR-Can (SKB TR 04-11), conducted by the Swedish Radiation Protection Authority (SSI) and the Swedish Nuclear Power Inspectorate (SKI). SKB's interim report describes and exemplifies the safety assessment methodology that SKB plans to use in the oncoming licence applications for an encapsulation plant and a final repository for spent nuclear fuel. The authorities' review takes into account the findings of an international peer review of SKB's interim report. The authorities conclude that SKB has improved its safety assessment methodology in several aspects compared to earlier safety reports. Among other things the authorities commend SKB for giving a comprehensive account of relevant regulations and guidance, and for the systematic approach to identification and documentation of features, events and processes that need to be considered in the safety assessment. However, the authorities also conclude that important parts of SKB's method need to be further developed before they are mature enough to be used as a basis for a license application. The authorities' overall assessment is summarised in chapter 8 of this report

  19. Development of a Computer Program for the Analysis Logistics of PWR Spent Fuels

    International Nuclear Information System (INIS)

    Choi, Heui Joo; Choi, Jong Won; Cha, Jeong Hun

    2008-01-01

    It is expected that the temporary storage facilities at the nuclear power plants will be full of the spent fuels within 10 years. Provided that a centralized interim storage facility is constructed along the coast of the Korean peninsula to solve this problem, a substantial amount of spent fuels should be transported by sea or by land every year. In this paper we developed a computer program for the analysis of transportation logistics of the spent fuels from 4 different nuclear power plant sites to the hypothetical centralized interim storage facility and the final repository. Mass balance equations were used to analyze the logistics between the nuclear power plants and the interim storage facility. To this end a computer program, CASK, was developed by using the VISUAL BASIC language. The annual transportation rates of spent fuels from the four nuclear power plant sites were determined by using the CASK program. The parameter study with the program illustrated the easiness of logistics analysis. The program could be used for the cost analysis of the spent fuel transportation as well.

  20. Report on achievements in fiscal 1998. Development of an interim processing technology to re-commercialize mixed waste plastics; 1998 nendo kongo haipura saishohinka no tame no chukan shori system gijutsu no kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    The container and package recycling law is fully enforced starting fiscal 2000. Recycling obligation is placed also on plastic containers and packages discharged from households, excepting PET bottles for beverages and soy sauce. Therefore, it is required to establish an interim processing technology to process these materials into shapes easy for re-utilization and transportation, that is a technology to manufacture granules with adequate diameters. The purpose of this research is to develop the interim processing system technology. Design, fabrication and installation were performed on an interim processing system plant (a mixed waste plastic granule manufacturing facility) that can process annually waste plastics of 3,000 tons (0.5 t/h). The plant consists of the following four pieces of equipment: (1) a pulverizer, (2) a PVC sorting device, (3) a granulating device, and (4) a sizer. After the installed interim processing system demonstration plant has been trially operated and adjusted by each device, the whole plant was given the trial operation and adjustment to have verified that all the devices function normally. In addition, in order to evaluate economy of the waste plastics interim processing, the processing cost was calculated and the economic performance was evaluated preliminarily by using the rated electric power setting and trial operation data of each device. (NEDO)

  1. Project No.3 - Cement solidification facility for spent ion exchange resins

    International Nuclear Information System (INIS)

    2000-01-01

    The existing storage capacity remaining for radioactive liquid wastes at the Ignalina NPP site is approximately 800 m 3 . The condition of the tanks is not fully known; however, recent engineering assessments have indicated that the tanks are unsuitable for interim storage of the liquid waste. The liquid waste currently stored in the tanks will need to be immobilised and the storage tanks emptied before they begin to deteriorate. The potential environment impact of these facilities must be reduced significantly. Project activities includes the design, construction and commissioning of the proposed facility, including all licensing documentation

  2. Engineering study: disposition of terminal liquors for interim storage

    International Nuclear Information System (INIS)

    Metz, W.P.; Ogren, W.E.

    1975-02-01

    Eight alternative processes were chosen as being technologically feasible within the time frame dictated by budgeting procedures and terminal liquor availability. Solidified waste products acceptable for single-shell tank storage were assumed to be placed in available single-shell tanks. Double-shell tanks were used only for the more mobile terminal liquors or semi-solid mush products. The mush, chemical neutralization, and clay in-tank processes offer potential savings of tens of millions of dollars over double-shell tank storage of terminal liquors. In order to achieve this cost savings, the process development and demonstration must be completed prior to the beginning of double-shell tank construction (Dec. 1976) expected to be funded from a fiscal year 1977 line item. Budgeting for these additional double-shell tanks must proceed since the processing options discussed here are not yet available and may not prove to be available at the required time. This study indicates the following topics for additional study: Process technology development to achieve interim storage of terminal liquor products receives the greatest emphasis as a means of reducing capital expenditures. Interim storage product criteria, waste inventory, and conversion to final form require definition to allow comparison of the alternatives for disposition of terminal liquors. The pseudotechnical nature of product acceptability criteria is important to the evaluation of the partial neutralization and aluminum removal alternatives. More accurate estimates of terminal liquor quantity and composition are required to give a sound technical basis for choosing the appropriate processing alternative. Retrieval and reprocessing operations may affect the comparisons presented by this study

  3. In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.

    Science.gov (United States)

    Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang

    2016-05-01

    The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (Pmargin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (Pmarginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (Pmarginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns

  4. Interim FDG-PET Scan in Hodgkin's Lymphoma: Hopes and Caveats

    Directory of Open Access Journals (Sweden)

    M. André

    2011-01-01

    Full Text Available FDG-PET has recently emerged as an important tool for the management of Hodgkins lymphoma. Although its use for initial staging and response evaluation at the end of treatment is well established, the place of interim PET for response assessment and subsequent treatment tailoring is still quite controversial. The use of interim PET after a few cycles of chemotherapy may allow treatment reduction for good responders, leading to lesser treatment toxicities as well as early treatment adaptation for bad responders with a potential higher chance for cure. Interpretation of interim PET is a rapidly moving field. Actually, visual interpretation is preferred over quantitative interpretation in this situation. The notion of minimal residual uptake emerged for faint persisting FDG uptake, but has evolved during the recent years. Guidelines using mediastinum and liver as references have been proposed at the expert meeting in Deauville 2009. Actually, several trials are ongoing both for localised and advanced disease to evaluate the FDG-PET potential for early treatment monitoring and tailoring. Until the results of these prospective randomized trials become available, treatment changes according to the interim PET results should remain inappropriate and limited to well-conducted clinical trials.

  5. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI...

  6. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  7. A qualitative analysis of facilities maintenance - a school governance function in South Africa

    Directory of Open Access Journals (Sweden)

    M I Xaba

    2012-01-01

    Full Text Available I analysed school facilities maintenance, a school governance function in South Africa. Qualitative interviews were conducted with 13 principals and three deputy principals as coordinators of this function at their schools. The interviews were purposively and conveniently selected to gather data regarding school facilities maintenance and gain insight into the challenges this function presents to schools and their governing bodies. Findings indicate that schools generally do not have organisational structures for planned facilities maintenance, nor do they have policies on facilities maintenance. Evidence of facilities maintenance at schools mainly relates to concerns with facilities repairs, (mostly "as the need arises" and general campus cleanliness; mostly with emergency and corrective forms of maintenance as opposed to crucial preventive maintenance. Therefore, there is a need for interim facilities maintenance committees and, in the long term, a whole-school approach to facilities maintenance that makes facilities maintenance a strategic lever for school functionality.

  8. Early interim 18F-FDG PET in Hodgkin's lymphoma: evaluation on 304 patients

    International Nuclear Information System (INIS)

    Zinzani, Pier Luigi; Stefoni, Vittorio; Broccoli, Alessandro; Argnani, Lisa; Baccarani, Michele; Rigacci, Luigi; Puccini, Benedetta; Castagnoli, Antonio; Vaggelli, Luca; Zanoni, Lucia; Fanti, Stefano

    2012-01-01

    The use of early (interim) PET restaging during first-line therapy of Hodgkin's lymphoma (HL) in clinical practice has considerably increased because of its ability to provide early recognition of treatment failure allowing patients to be transferred to more intensive treatment regimens. Between June 1997 and June 2009, 304 patients with newly diagnosed HL (147 early stage and 157 advanced stage) were treated with the ABVD regimen at two Italian institutions. Patients underwent PET staging and restaging at baseline, after two cycles of therapy and at the end of the treatment. Of the 304 patients, 53 showed a positive interim PET scan and of these only 13 (24.5%) achieved continuous complete remission (CCR), whereas 251 patients showed a negative PET scan and of these 231 (92%) achieved CCR. Comparison between interim PET-positive and interim PET-negative patients indicated a significant association between PET findings and 9-year progression-free survival and 9-year overall survival, with a median follow-up of 31 months. Among the early-stage patients, 19 had a positive interim PET scan and only 4 (21%) achieved CCR; among the 128 patients with a negative interim PET scan, 122 (97.6%) achieved CCR. Among the advanced-stage patients, 34 showed a persistently positive PET scan with only 9 (26.4%) achieving CCR, whereas 123 showed a negative interim PET scan with 109 (88.6%) achieving CCR. Our results demonstrate the role of an early PET scan as a significant step forward in the management of patients with early-stage or advanced-stage HL. (orig.)

  9. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Science.gov (United States)

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim waiver...

  10. Design requirements document for Project W-465, immobilized low-activity waste interim storage

    International Nuclear Information System (INIS)

    Burbank, D.A.

    1998-01-01

    The scope of this Design Requirements Document (DRD) is to identify the functions and associated requirements that must be performed to accept, transport, handle, and store immobilized low-activity waste (ILAW) produced by the privatized Tank Waste Remediation System (TWRS) treatment contractors. The functional and performance requirements in this document provide the basis for the conceptual design of the TWRS ILAW Interim Storage facility project and provides traceability from the program level requirements to the project design activity. Technical and programmatic risk associated with the TWRS planning basis are discussed in the Tank Waste Remediation System Decisions and Risk Assessment (Johnson 1994). The design requirements provided in this document will be augmented by additional detailed design data documented by the project

  11. Fit of interim crowns fabricated using photopolymer-jetting 3D printing.

    Science.gov (United States)

    Mai, Hang-Nga; Lee, Kyu-Bok; Lee, Du-Hyeong

    2017-08-01

    The fit of interim crowns fabricated using 3-dimensional (3D) printing is unknown. The purpose of this in vitro study was to evaluate the fit of interim crowns fabricated using photopolymer-jetting 3D printing and to compare it with that of milling and compression molding methods. Twelve study models were fabricated by making an impression of a metal master model of the mandibular first molar. On each study model, interim crowns (N=36) were fabricated using compression molding (molding group, n=12), milling (milling group, n=12), and 3D polymer-jetting methods. The crowns were prepared as follows: molding group, overimpression technique; milling group, a 5-axis dental milling machine; and polymer-jetting group using a 3D printer. The fit of interim crowns was evaluated in the proximal, marginal, internal axial, and internal occlusal regions by using the image-superimposition and silicone-replica techniques. The Mann-Whitney U test and Kruskal-Wallis tests were used to compare the results among groups (α=.05). Compared with the molding group, the milling and polymer-jetting groups showed more accurate results in the proximal and marginal regions (P3D printing significantly enhanced the fit of interim crowns, particularly in the occlusal region. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  12. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    International Nuclear Information System (INIS)

    2011-01-01

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location

  13. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    Energy Technology Data Exchange (ETDEWEB)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    2011-06-20

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location

  14. Functional criteria for emergency response facilities. Technical report (final)

    International Nuclear Information System (INIS)

    1981-02-01

    This report describes the facilities and systems to be used by nuclear power plant licensees to improve responses to emergency situations. The facilities include the Technical Support Center (TSC), Onsite Operational Support Center (OSC), and Nearsite Emergency Operations Facility (EOF), as well as a brief discussion of the emergency response function of the control room. The data systems described are the Safety Parameter Display System (SPDS) and Nuclear Data Link (NDL). Together, these facilities and systems make up the total Emergency Response Facilities (ERFs). Licensees should follow the guidance provided both in this report and in NUREG-0654 (FEMA-REP-1), Revision 1, for design and implementation of the ERFs

  15. Expert's statement on the research reactor Munich II (FRM-II); Gutachterliche Stellungnahme zum Forschungsreaktor Muenchen II (FRM-II)

    Energy Technology Data Exchange (ETDEWEB)

    Liebert, Wolfgang; Friess, Friederike; Gufler, Klaus; Arnold, Nikolaus [Univ. fuer Bodenkultur (BOKU), Wien (Austria). Inst. fuer Sicherheits- und Risikowissenschaften (ISR)

    2017-12-15

    The Expert's statement on the research reactor FRM-II covers the following issues: The situation in Germany with respect to HEU (highly enriched uranium) fuel elements, the proliferation problems related to HEU fuel and the generated high-level radioactive wastes, possible safety hazards of an interim storage of HEU containing wastes, for instance in the interim storage facility Ahaus, possible safety hazards of final disposal of HEU containing radioactive wastes, possibilities to avoid the use of HEU fuel in order to prevent further production of these wastes, requirement of processing spent HEU containing fuel elements for final disposal.

  16. Tritium Systems Test Facility. Volume I

    International Nuclear Information System (INIS)

    Anderson, G.W.; Battleson, K.W.; Bauer, W.

    1976-10-01

    Sandia Laboratories proposes to build and operate a Tritium Systems Test Facility (TSTF) in its newly completed Tritium Research Laboratory at Livermore, California (see frontispiece). The facility will demonstrate at a scale factor of 1:200 the tritium fuel cycle systems for an Experimental Power Reactor (EPR). This scale for each of the TSTF subsystems--torus, pumping system, fuel purifier, isotope separator, and tritium store--will allow confident extrapolation to EPR dimensions. Coolant loop and reactor hall cleanup facilities are also reproduced, but to different scales. It is believed that all critical details of an EPR tritium system will be simulated correctly in the facility. Tritium systems necessary for interim devices such as the Ignition Test Reactor (ITR) or The Next Step (TNS) can also be simulated in TSTF at other scale values. The active tritium system will be completely enclosed in an inert atmosphere glove box which will be connected to the existing Gas Purification System (GPS) of the Tritium Research Laboratory. In effect, the GPS will become the scaled environmental control system which otherwise would have to be built especially for the TSTF

  17. A Non-Traditional Interim Project.

    Science.gov (United States)

    Brown, Diane; Ward, Dorothy

    1980-01-01

    Describes a project initiated by the Foreign Language Department of Birmingham-Southern College for their Interim term and discusses an interdisciplinary course focusing on Medieval Europe. The course included presentations on German and French language and literature, as well as lectures on the arts, philosophy, and family life of the period.…

  18. Approaches of selecting options for upgrading of safety of near surface facilities

    International Nuclear Information System (INIS)

    Goldammer, W.

    2003-01-01

    General principle of optimization using cost-benefit analysis and multi-attribute utility analysis and considering the radiological and ecological risks are discussed. Alternative scenarios (unplanned events) are also considered. Comparison of options for interim storage facility is made in the example of Uranium mining. The conclusions from the example are: Quantitative optimisation necessary in order to arrive at conclusion (higher financial expenditures yield lower risks); Only inclusion of failure scenarios reveals that passive safety of wet option is not satisfactory; Probabilistic simulation allows for keeping track of uncertainties and assessing their consequences within the decision-making process; Optimisation analysis can be refined in the course of further reclamation planning to allow for questions on detailed design to be addressed. Pragmatic (non-quantitative) assessment cannot reveal how safe is safe enough. Different options for the waste storage in an interim storage facility are analysed. The methodology includes: Estimate of cost components; Discounting of long-term costs; Estimate of risks; Assessment of qualitative factors; Definition of weighting factors; Application of multi-attribute utility analysis; Deterministic sensitivity analysis for important parameters.The examples show the importance of the incorporation of qualitative factors, weighting of parameters and sensitivity analysis in the decision making

  19. Hazardous Waste Management System - Identification and Listing of Hazardous Waste - Toxicity Characteristic - Hydrocarbon Recovery Operations - Federal Register Notice, October 5, 1990

    Science.gov (United States)

    The Agency is promulgating an interim final rule to extend the compliance date of the Toxicity Characteristic rule for petroleum refining facilities, marketing terminals and bulk plants engaged in the recovery and remediation operation for 120 days.

  20. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS. ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    International Nuclear Information System (INIS)

    Rutherford, W.W.; Geuther, W.J.; Strankman, M.R.; Conrad, E.A.; Rhoadarmer, D.D.; Black, D.M.; Pottmeyer, J.A.

    2009-01-01

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is

  1. SLUDGE TREATMENT PROJECT PHASE 1 SLUDGE STORAGE OPTIONS ASSESSMENT OF T PLANT VERSUS ALTERNATE STORAGE FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR; CONRAD EA; RHOADARMER DD; BLACK DM; POTTMEYER JA

    2009-04-29

    The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transport and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is

  2. Engineering evaluation/conceptual plan for the 200-UP-1 groundwater operable unit interim remedial measure

    International Nuclear Information System (INIS)

    Myers, D.A.; Swanson, L.C.; Weeks, R.S.; Giacinto, J.; Gustafson, F.W.; Ford, B.H.; Wittreich, C.; Parnell, S.; Green, J.

    1995-04-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (ERM) to address a uranium and technetium-99 groundwater plume and an associated nitrate contamination plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need and potentially achievable objectives and goals for an IRM and evaluates alternatives to contain elevated concentrations of uranium, technetium-99, nitrate, and carbon tetrachloride and to obtain information necessary to develop final remedial actions for the operable unit

  3. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 3. GSFLS technical and financial analysis. Interim report

    International Nuclear Information System (INIS)

    1978-01-01

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported herein. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. A technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives

  4. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 3A. GSFLS technical analysis (appendix). Interim report

    International Nuclear Information System (INIS)

    1978-01-01

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. A technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives

  5. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 3A. GSFLS technical analysis (appendix). Interim report

    Energy Technology Data Exchange (ETDEWEB)

    Kriger, A.

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. A technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives.

  6. A web-based endpoint adjudication system for interim analyses in clinical trials.

    Science.gov (United States)

    Nolen, Tracy L; Dimmick, Bill F; Ostrosky-Zeichner, Luis; Kendrick, Amy S; Sable, Carole; Ngai, Angela; Wallace, Dennis

    2009-02-01

    A data monitoring committee (DMC) is often employed to assess trial progress and review safety data and efficacy endpoints throughout a trail. Interim analyses performed for the DMC should use data that are as complete and verified as possible. Such analyses are complicated when data verification involves subjective study endpoints or requires clinical expertise to determine each subject's status with respect to the study endpoint. Therefore, procedures are needed to obtain adjudicated data for interim analyses in an efficient manner. In the past, methods for handling such data included using locally reported results as surrogate endpoints, adjusting analysis methods for unadjudicated data, or simply performing the adjudication as rapidly as possible. These methods all have inadequacies that make their sole usage suboptimal. For a study of prophylaxis for invasive candidiasis, adjudication of both study eligibility criteria and clinical endpoints prior to two interim analyses was required. Because the study was expected to enroll at a moderate rate and the sponsor required adjudicated endpoints to be used for interim analyses, an efficient process for adjudication was required. We created a web-based endpoint adjudication system (WebEAS) that allows for expedited review by the endpoint adjudication committee (EAC). This system automatically identifies when a subject's data are complete, creates a subject profile from the study data, and assigns EAC reviewers. The reviewers use the WebEAS to review the subject profile and submit their completed review form. The WebEAS then compares the reviews, assigns an additional review as a tiebreaker if needed, and stores the adjudicated data. The study for which this system was originally built was administratively closed after 10 months with only 38 subjects enrolled. The adjudication process was finalized and the WebEAS system activated prior to study closure. Some website accessibility issues presented initially. However

  7. Technical support to environmental restoration division for groundwater level monitoring effort at entombed Hallam Nuclear Power Facility. Final report, August 1, 1993--July 31, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    This report provides an interim summary of information from a water-level monitoring program. The information was collected by the US Geological Survey (USGS) over a 6-month period. The monitoring program between the US DOE and the USGS was set up to measure water levels in 16 observation wells at the Hallam Nuclear Facility in Hallam, Nebraska. The summary of USGS data includes: (1) a description of the USGS monitoring program; (2) a description of the collection of continuous water-level data; (3) a description of the collection of monthly water-level data; (4) table of observation well number, latitude, longitude, and depth; (5) table of monthly ground-water levels data; (6) table of recorder wells, rainfall, and barometric pressure values; (7) table of recorder well, rainfall, and barometric pressure daily values; and (8) hydrographs of selected wells. 7 figs., 3 tabs

  8. ITER interim design report package documents

    International Nuclear Information System (INIS)

    1996-01-01

    This publication contains the Excerpt from the ITER Council (IC-8), the ITER Interim Design Report, Cost Review and Safety Analysis, ITER Site Requirements and ITER Site Design Assumptions and the Excerpt from the ITER Council (IC-9). 8 figs, 2 tabs

  9. Spent fuel interim storage

    International Nuclear Information System (INIS)

    Bilegan, Iosif C.

    2003-01-01

    The official inauguration of the spent fuel interim storage took place on Monday July 28, 2003 at Cernavoda NNP. The inaugural event was attended by local and central public authority representatives, a Canadian Government delegation as well as newsmen from local and central mass media and numerous specialists from Cernavoda NPP compound. Mr Andrei Grigorescu, State Secretary with the Economy and Commerce Ministry, underlined in his talk the importance of this objective for the continuous development of nuclear power in Romania as well as for Romania's complying with the EU practice in this field. Also the excellent collaboration between the Canadian contractor AECL and the Romanian partners Nuclear Montaj, CITON, UTI, General Concret in the accomplishment of this unit at the planned terms and costs. On behalf of Canadian delegation, spoke Minister Don Boudria. He underlined the importance which the Canadian Government affords to the cooperation with Romania aiming at specific objectives in the field of nuclear power such as the Cernavoda NPP Unit 2 and spent fuel interim storage. After traditional cutting of the inaugural ribbon by the two Ministers the festivities continued on the Cernavoda NPP Compound with undersigning the documents regarding the project completion and a press conference

  10. A randomized controlled trial of interim methadone maintenance.

    Science.gov (United States)

    Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J

    2006-01-01

    Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (Pmethadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.

  11. The Safety Assessment of Long term Interim Storage at Sellafield

    International Nuclear Information System (INIS)

    Buchan, Andrew B.

    2014-01-01

    that are most significant in terms of frequency and unmitigated potential consequences PSA looks at the full range of fault sequences and allows full incorporation of the reliability and failure probability of the safety measures and other features of the design and operations SAA considers significant but unlikely accidents where off-site consequences are likely to significantly affect the critical group and provides information on their progression, within the facility and also beyond the site boundary. The paper will illustrate how these techniques have been utilised to facilitate design, operation, resilience evaluation and accident management of facilities supporting long term interim storage at Sellafield. (author)

  12. Interim report to the Nuclear Regulatory Commission on radioactive waste classification

    International Nuclear Information System (INIS)

    King, W.C.; Cohen, J.J.

    1977-01-01

    The Lawrence Livermore Laboratory assisted the Nuclear Regulatory Commission in the development of a radioactive waste classification system that will satisfy technical, environmental, and societal concerns. This is an interim report to the NRC on work accomplished to date. It describes a proposed waste-classification system that is based on the final disposition of waste material. The system consists of three classes of radioactive waste. The classification of any radioactive waste will depend primarily on its hazard potential. Other characteristics such as longevity (half-size) will be considered also. The levels of hazard that differentiate the three classes of radioactive waste will be determined by ongoing work. This report describes other work to be completed before a suitable radioactive waste-classificaion system is established

  13. Interim measure conceptual design for remediation at the former CCC/USDA grain storage facility at Centralia, Kansas : pilot test and remedy implementation.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-11-09

    This document presents an Interim Measure Work Plan/Design for the short-term, field-scale pilot testing and subsequent implementation of a non-emergency Interim Measure (IM) at the site of the former grain storage facility operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Centralia, Kansas. The IM is recommended to mitigate both (1) localized carbon tetrachloride contamination in the vadose zone soils beneath the former facility and (2) present (and potentially future) carbon tetrachloride contamination identified in the shallow groundwater beneath and in the immediate vicinity of the former CCC/USDA facility. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory have demonstrated that groundwater at the Centralia site is contaminated with carbon tetrachloride at levels that exceed the Kansas Tier 2 Risk-Based Screening Level (RBSL) and the U.S. Environmental Protection Agency's maximum contaminant level of 5.0 {micro}g/L for this compound. Groundwater sampling and analyses conducted by Argonne under a monitoring program approved by the Kansas Department of Health and Environment (KDHE) indicated that the carbon tetrachloride levels at several locations in the groundwater plume have increased since twice yearly monitoring of the site began in September 2005. The identified groundwater contamination currently poses no unacceptable health risks, in view of the absence of potential human receptors in the vicinity of the former CCC/USDA facility. Carbon tetrachloride contamination has also been identified at Centralia in subsurface soils at concentrations on the order of the Kansas Tier 2 RBSL of 200 {micro}g/kg in soil for the soil-to-groundwater protection pathway. Soils contaminated at this level might pose some risk as a potential source of carbon tetrachloride contamination to groundwater. To mitigate the existing contaminant levels and decrease the potential future concentrations of

  14. Analysis of the transportation logistics for spent nuclear fuel in Korea

    International Nuclear Information System (INIS)

    Lee, Hyo Jik; Ko, Won Il; Seo, Ki Seok

    2010-01-01

    , TranScenario provides some statistical information, such as the voyage time, the availability of the interim storage facility, the number of transported casks sent from the NPP s , and the number of transported casks received at the interim storage facility. By using this information, users can verify and validate a yearly transportation schedule. In this way, the 24 candidate scenarios could be constructed easily. Finally, these 24 scenarios were compared in terms of their operation cost

  15. Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility

    International Nuclear Information System (INIS)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building

  16. Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility

    International Nuclear Information System (INIS)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building

  17. Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility

    International Nuclear Information System (INIS)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building

  18. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    Science.gov (United States)

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  19. DOE UST interim subsurface barrier technologies workshop

    International Nuclear Information System (INIS)

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation

  20. Mirror Fusion Test Facility-B (MFTF-B) axicell configuration: NbTi magnet system. Manufacturing/producibility final report. Volume 2

    International Nuclear Information System (INIS)

    Ritschel, A.J.; White, W.L.

    1985-05-01

    This Final MFTF-B Manufacturing/Producibility Report covers facilities, tooling plan, manufacturing sequence, schedule and performance, producibility, and lessons learned for the solenoid, axicell, and transition coils, as well as a deactivation plan, conclusions, references, and appendices

  1. Alpha Decontamination and Disassembly Pilot Facility. Final report

    International Nuclear Information System (INIS)

    Daugherty, B.A.; Clark, H.E.

    1985-04-01

    The Alpha Decontamination and Disassembly (AD and D) Pilot Facility was built to develop and demonstrate a reference process for the decontamination and size reduction of noncombustible transuranic (TRU) waste. The goals of the reference process were to remove >99% of the surface contamination to the high-level waste tanks, and to achieve volume reduction factors greater than 15:1. Preliminary bench-scale decontamination work was accomplished at Savannah River Laboratory (SRL), establishing a reference decontamination process. Initially, the pilot facility did not achieve the decontamination goals. As the program continued, and modifications to the process were made, coupon analysis idicated that 99% of the surface contamination was removed to the high-level drain system. Prior to the AD and D Pilot Facility, no size reduction work had been done at SRL. Several other Department of Energy (DOE) facilities were experimenting with plasma arc torches for size reduction work. Their methods were employed in the AD and D hot cell with moderate success. The experimental work concluded with recommendations for further testing of other size reduction techniques. 11 figs., 6 tabs

  2. National report for Switzerland

    Energy Technology Data Exchange (ETDEWEB)

    Stratton, R [and others

    1997-12-01

    The presentation discusses general situation with nuclear energy in Switzerland; energy debate on the future of nuclear power; reactor operation; licensing questions; construction of a Swiss interim storage facility; final repository for low and intermediate level wastes; fuel research.

  3. National report for Switzerland

    International Nuclear Information System (INIS)

    Stratton, R.

    1997-01-01

    The presentation discusses general situation with nuclear energy in Switzerland; energy debate on the future of nuclear power; reactor operation; licensing questions; construction of a Swiss interim storage facility; final repository for low and intermediate level wastes; fuel research

  4. A conservative method of retaining an interim obturator for a total maxillectomy patient

    Directory of Open Access Journals (Sweden)

    Nirmal Famila Bettie

    2017-01-01

    Full Text Available Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  5. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    Science.gov (United States)

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  6. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma

    DEFF Research Database (Denmark)

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane

    2013-01-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting...... in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score...

  7. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  8. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  9. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Science.gov (United States)

    2013-07-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0114] Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an interim Enforcement Policy that allows...

  10. Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.

    Science.gov (United States)

    Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay

    2018-04-17

    In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.

  11. Pathways to deep decarbonization - Interim 2014 Report

    International Nuclear Information System (INIS)

    2014-01-01

    The interim 2014 report by the Deep Decarbonization Pathways Project (DDPP), coordinated and published by IDDRI and the Sustainable Development Solutions Network (SDSN), presents preliminary findings of the pathways developed by the DDPP Country Research Teams with the objective of achieving emission reductions consistent with limiting global warming to less than 2 deg. C. The DDPP is a knowledge network comprising 15 Country Research Teams and several Partner Organizations who develop and share methods, assumptions, and findings related to deep decarbonization. Each DDPP Country Research Team has developed an illustrative road-map for the transition to a low-carbon economy, with the intent of taking into account national socio-economic conditions, development aspirations, infrastructure stocks, resource endowments, and other relevant factors. The interim 2014 report focuses on technically feasible pathways to deep decarbonization

  12. Final design and progress of WEAVE : the next generation wide-field spectroscopy facility for the William Herschel Telescope

    NARCIS (Netherlands)

    Dalton, Gavin; Trager, Scott; Abrams, Don Carlos; Bonifacio, Piercarlo; Aguerri, J. Alfonso L.; Middleton, Kevin; Benn, Chris; Dee, Kevin; Sayède, Frédéric; Lewis, Ian; Pragt, Johannes; Pico, Sergio; Walton, Nic; Rey, Jeurg; Allende Prieto, Carlos; Peñate, José; Lhome, Emilie; Agócs, Tibor; Alonso, José; Terrett, David; Brock, Matthew; Gilbert, James; Schallig, Ellen; Ridings, Andy; Guinouard, Isabelle; Verheijen, Marc; Tosh, Ian; Rogers, Kevin; Lee, Martin; Steele, Iain; Stuik, Remko; Tromp, Niels; Jaskó, Attila; Carrasco, Esperanza; Farcas, Szigfrid; Kragt, Jan; Lesman, Dirk; Kroes, Gabby; Mottram, Chris; Bates, Stuart; Rodriguez, Luis Fernando; Gribbin, Frank; Delgado, José Miguel; Herreros, José Miguel; Martin, Carlos; Cano, Diego; Navarro, Ramon; Irwin, Mike; Lewis, Jim; Gonzalez Solares, Eduardo; Murphy, David; Worley, Clare; Bassom, Richard; O'Mahoney, Neil; Bianco, Andrea; Zurita, Christina; ter Horst, Rik; Molinari, Emilio; Lodi, Marcello; Guerra, José; Martin, Adrian; Vallenari, Antonella; Salasnich, Bernardo; Baruffolo, Andrea; Jin, Shoko; Hill, Vanessa; Smith, Dan; Drew, Janet; Poggianti, Bianca; Pieri, Mat; Dominquez Palmero, Lillian; Farina, Cecilia

    2016-01-01

    We present the Final Design of the WEAVE next-generation spectroscopy facility for the William Herschel Telescope (WHT), together with a status update on the details of manufacturing, integration and the overall project schedule now that all the major fabrication contracts are in place. We also

  13. Final design and progress of WEAVE: the next generation wide-field spectroscopy facility for the William Herschel Telescope

    NARCIS (Netherlands)

    Dalton, Gavin; Trager, Scott; Abrams, Don Carlos; Bonifacio, Piercarlo; Aguerri, J. Alfonso L.; Middleton, Kevin; Benn, Chris; Dee, Kevin; Sayède, Frédéric; Lewis, Ian; Pragt, Johannes; Pico, Sergio; Walton, Nic; Rey, Jeurg; Allende Prieto, Carlos; Peñate, José; Lhome, Emilie; Agócs, Tibor; Alonso, José; Terrett, David; Brock, Matthew; Gilbert, James; Schallig, Ellen; Ridings, Andy; Guinouard, Isabelle; Verheijen, Marc; Tosh, Ian; Rogers, Kevin; Lee, Martin; Steele, Iain; Stuik, Remko; Tromp, Niels; Jaskó, Attila; Carrasco, Esperanza; Farcas, Szigfrid; Kragt, Jan; Lesman, Dirk; Kroes, Gabby; Mottram, Chris; Bates, Stuart; Rodriguez, Luis Fernando; Gribbin, Frank; Delgado, José Miguel; Herreros, José Miguel; Martin, Carlos; Cano, Diego; Navarro, Ramon; Irwin, Mike; Lewis, Jim; Gonzalez Solares, Eduardo; Murphy, David; Worley, Clare; Bassom, Richard; O'Mahoney, Neil; Bianco, Andrea; Zurita, Christina; ter Horst, Rik; Molinari, Emilio; Lodi, Marcello; Guerra, José; Martin, Adrian; Vallenari, Antonella; Salasnich, Bernardo; Baruffolo, Andrea; Jin, Shoko; Hill, Vanessa; Smith, Dan; Drew, Janet; Poggianti, Bianca; Pieri, Mat; Dominquez Palmero, Lillian; Farina, Cecilia

    2016-01-01

    We present the Final Design of the WEAVE next-generation spectroscopy facility for the William Herschel Telescope (WHT), together with a status update on the details of manufacturing, integration and the overall project schedule now that all the major fabrication contracts are in place. We also

  14. 33 CFR 385.38 - Interim goals.

    Science.gov (United States)

    2010-07-01

    ..., monitoring and assessment; (ii) Be provided to the independent scientific review panel established in.... The interim goals shall be developed through the use of appropriate models and tools and shall provide... to be required to meet long-term hydrological and ecological restoration goals, based on best...

  15. Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites

    International Nuclear Information System (INIS)

    Klein, A.R.; Bloom, C.W.

    1989-07-01

    This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs

  16. Comparison of cask and drywell storage concepts for a monitored retrievable storage/interim storage system

    International Nuclear Information System (INIS)

    Rasmussen, D.E.

    1982-12-01

    The Department of Energy, through its Richland Operations Office is evaluating the feasibility, timing, and cost of providing a federal capability for storing the spent fuel, high-level wastes, and transuranic wastes that DOE may be obligated by law to manage until permanent waste disposal facilities are available. Three concepts utilizing a monitored retrievable storage/interim storage (MRS/IS) facility have been developed and analyzed. The first concept, co-location with a reprocessing plant, has been developed by staff of Allied General Nuclear Services. the second concept, a stand-alone facility, has been developed by staff of the General Atomic Company. The third concept, co-location with a deep geologic repository, has been developed by the Pacific Northwest Laboratory with the assistance of the Westinghouse Hanford Company and Kaiser Engineers. The objectives of this study are: to develop preconceptual designs for MRS/IS facilities: to examine various issues such as transportation of wastes, licensing of the facilities, and environmental concerns associated with operation of such facilities; and to estimate the life-cycle costs of the facilities when operated in response to a set of scenarios that define the quantities and types of waste requiring storage in specific time periods, generally spanning the years 1989 to 2037. Three scenarios are examined to develop estimates of life-cycle costs for the MRS/IS facilities. In the first scenario, the reprocessing plant is placed in service in 1989 and HLW canisters are stored until a repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at intervals as needed to meet the demand. In the second scenario, the reprocessing plants are delayed in starting operations by 10 years, but the repositories open on schedule. In the third scenario, the repositories are delayed 10 years, but the reprocessing plants open on schedule

  17. Comparison of cask and drywell storage concepts for a monitored retrievable storage/interim storage system

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, D.E.

    1982-12-01

    The Department of Energy, through its Richland Operations Office is evaluating the feasibility, timing, and cost of providing a federal capability for storing the spent fuel, high-level wastes, and transuranic wastes that DOE may be obligated by law to manage until permanent waste disposal facilities are available. Three concepts utilizing a monitored retrievable storage/interim storage (MRS/IS) facility have been developed and analyzed. The first concept, co-location with a reprocessing plant, has been developed by staff of Allied General Nuclear Services. the second concept, a stand-alone facility, has been developed by staff of the General Atomic Company. The third concept, co-location with a deep geologic repository, has been developed by the Pacific Northwest Laboratory with the assistance of the Westinghouse Hanford Company and Kaiser Engineers. The objectives of this study are: to develop preconceptual designs for MRS/IS facilities: to examine various issues such as transportation of wastes, licensing of the facilities, and environmental concerns associated with operation of such facilities; and to estimate the life-cycle costs of the facilities when operated in response to a set of scenarios that define the quantities and types of waste requiring storage in specific time periods, generally spanning the years 1989 to 2037. Three scenarios are examined to develop estimates of life-cycle costs for the MRS/IS facilities. In the first scenario, the reprocessing plant is placed in service in 1989 and HLW canisters are stored until a repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at intervals as needed to meet the demand. In the second scenario, the reprocessing plants are delayed in starting operations by 10 years, but the repositories open on schedule. In the third scenario, the repositories are delayed 10 years, but the reprocessing plants open on schedule.

  18. Operational Implementation of the MARSSIM Process at the Wayne Interim Storage Site

    International Nuclear Information System (INIS)

    Hays, D. C. Jr.; Trujillo, P. A. IV.; Zoller, S. G.

    2002-01-01

    This paper describes the methodologies behind the operational implementation of the Multi Agency Radiation Site Survey and Investigation Manual (MARSSIM) process at the Wayne Interim Storage Site (WISS). The United States Army Corps of Engineers (USACE) and Environmental Chemical Corporation (ECC) have implemented the MARSSIM process using various surveys producing raw data. The final remedial status of a survey unit is derived through data reduction, while maintaining a high degree of efficiency in the construction aspects of the remedial action. Data reduction of field measurements is accomplished by merging the data outputs of a Digital Global Positioning System, an exposure rate meter, and laboratory analyses to produce maps which present exposure rates, elevations, survey unit boundaries, direct measurement locations, and sampling locations on a single map. The map serves as a data-posting plot and allows the project team to easily judge the survey unit's remedial status. The operational implementation of the MARSSIM process has been successful in determining the eligibility of survey units for final status surveys at the WISS and also in demonstrating final status radiological and chemical conditions while maintaining an efficient remedial action effort

  19. Albany Interim Landfill gas extraction and mobile power system: Using landfill gas to produce electricity. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The Albany Interim Landfill Gas Extraction and Mobile Power System project served three research objectives: (1) determination of the general efficiency and radius of influence of horizontally placed landfill gas extraction conduits; (2) determination of cost and effectiveness of a hydrogen sulfide gas scrubber utilizing Enviro-Scrub{trademark} liquid reagent; and (3) construction and evaluation of a dual-fuel (landfill gas/diesel) 100 kW mobile power station. The horizontal gas extraction system was very successful; overall, gas recovery was high and the practical radius of influence of individual extractors was about 50 feet. The hydrogen sulfide scrubber was effective and its use appears feasible at typical hydrogen sulfide concentrations and gas flows. The dual-fuel mobile power station performed dependably and was able to deliver smooth power output under varying load and landfill gas fuel conditions.

  20. PNL size reduction and decontamination facilities and capabilities

    International Nuclear Information System (INIS)

    Allen, R.P.; Fetrow, L.K.; McCoy, M.W.

    1983-07-01

    Studies sponsored by the US Department of Energy at Pacific Northwest Laboratory (PNL) have resulted in the development of an effective, integrated size reduction and decontamination system for transuranically contaminated components. Using this system, a reduction of more than 95% in the volume of transuranic waste requiring interim storage and eventual geologic disposal has been achieved for typical plutonium contaminated glove boxes. This paper describes the separate preparation, size reduction, decontamination and waste treatment operations and facilities that have been developed and demonstrated as part of this work

  1. Interim format and content for a physical security plan for nuclear power plants

    International Nuclear Information System (INIS)

    1977-02-01

    The document serves as interim guidance to assist the licensee or applicant in the preparation of a physical security plan. It is to be used in conjunction with interim acceptance criteria for physical security programs, which will be distributed at a later date

  2. ASPECTS CONCERNING INTERIM FINANCIAL REPORTING IN ROMANIA: STANDARDS AND REGULATIONS

    Directory of Open Access Journals (Sweden)

    Aristita Rotila

    2014-12-01

    Full Text Available The mechanisms employed for the communication of accounting information that is necessary for users in their economic decision-making process consist of the financial statements of an entity. All legal entities, no matter the domain of their activity, have the obligation to draw up annual financial statements for every completed financial year. For certain categories of entities, reporting obligations are also required for periods other than the annual reporting, throughout the financial year. It is the case of interim financial reporting. At the level of the international accounting framework, the aspects related to interim financial reporting are the subject of a separate standard, namely, IAS 34 Interim Financial Reporting. In Romania, the current system of accounting regulations concerning the annual financial statements comprises accounting regulations that comply with the European directives and which apply to the various categories of entities, on the one hand and, on the other, accounting regulations in line with the IFRS, which are applicable to other classes of entities from certain activity sectors. The accounting regulations that apply to each category refer to, among other things, the contents and the format of financial statements that have to be presented. Analysing the system of norms and regulations, this article identifies the requirements concerning interim financial reporting in Romania, with reference to the different types of entities.

  3. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  4. Taking interim actions: Integrating CERCLA and NEPA to move ahead with site cleanup

    International Nuclear Information System (INIS)

    MacDonell, M.M.; Peterson, J.M.; Valett, G.L.; McCracken, S.H.

    1991-01-01

    The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation and implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site

  5. Engineering Evaluation/Cost Analysis for Power Burst Facility (PER-620) Final End State and PBF Vessel Disposal

    Energy Technology Data Exchange (ETDEWEB)

    B. C. Culp

    2007-05-01

    Preparation of this engineering evaluation/cost analysis is consistent with the joint U.S. Department of Energy and U.S. Environmental Protection Agency Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation, and Liability Act, (DOE and EPA 1995) which establishes the Comprehensive Environmental, Response, Compensation, and Liability Act non-time critical removal action process as an approach for decommissioning. The scope of this engineering evaluation/cost analysis is to evaluate alternatives and recommend a preferred alternative for the final end state of the PBF and the final disposal location for the PBF vessel.

  6. 19 CFR 354.8 - Interim sanctions.

    Science.gov (United States)

    2010-04-01

    ... reconsider imposition of interim sanctions on the basis of new and material evidence or other good cause... Secretary may petition a presiding official to impose such sanctions. (b) The presiding official may impose... person to return material previously provided by the Department and all other materials containing the...

  7. Compilation of interim technical research memoranda. Volume I

    International Nuclear Information System (INIS)

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields

  8. Time-dependent crack growth in Alloy 718: An interim assessment

    International Nuclear Information System (INIS)

    James, L.A.

    1982-08-01

    Previous results on the time-dependent nature of fatigue-crack propagation (FCP) in Alloy 718 at elevated temperatures were reviewed. Additional experiments were conducted to further define certain aspects of the time-dependent crack growth behavior. it was found that loading waveform influenced FCP behavior, with tensile hold-times producing higher growth rates than continuous cycling at the same frequency. Crack growth rates under hold-time conditions tended to increase with decreasing grain size. Finally, experiments were conducted which tended to cast some doubt upon the ability of linear-elastic fracture mechanics (LEFM) techniques to characterize cracking behavior in this alloy under hold-time conditions. However, since a superior correlating parameter has not yet been proven, it is suggested that LEFM methods be used in the interim with appropriate safety factors to account for the potential errors. 34 refs., 10 figs., 4 tabs

  9. Engineering evaluation/conceptual plan for the 200-UP-1 Groundwater Operable Unit interim remedial measure. Revision 2

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents an engineering evaluation and conceptual plan for an interim remedial measure (IRM) to address a uranium and technetium-99 groundwater plume in the 200-UP-1 Groundwater Operable Unit located in the 200 West Area of the Hanford Site. This report provides information regarding the need for an IRM and its potentially achievable objectives and goals. The report also evaluates alternatives to contain elevated concentrations of uranium and technetium-99 and to obtain information necessary to develop final remedial actions for the operable unit

  10. Determining initial enrichment, burnup, and cooling time of pressurized-water-reactor spent fuel assemblies by analyzing passive gamma spectra measured at the Clab interim-fuel storage facility in Sweden

    Science.gov (United States)

    Favalli, A.; Vo, D.; Grogan, B.; Jansson, P.; Liljenfeldt, H.; Mozin, V.; Schwalbach, P.; Sjöland, A.; Tobin, S. J.; Trellue, H.; Vaccaro, S.

    2016-06-01

    The purpose of the Next Generation Safeguards Initiative (NGSI)-Spent Fuel (SF) project is to strengthen the technical toolkit of safeguards inspectors and/or other interested parties. The NGSI-SF team is working to achieve the following technical goals more easily and efficiently than in the past using nondestructive assay measurements of spent fuel assemblies: (1) verify the initial enrichment, burnup, and cooling time of facility declaration; (2) detect the diversion or replacement of pins; (3) estimate the plutonium mass [which is also a function of the variables in (1)]; (4) estimate the decay heat; and (5) determine the reactivity of spent fuel assemblies. Since August 2013, a set of measurement campaigns has been conducted at the Central Interim Storage Facility for Spent Nuclear Fuel (Clab), in collaboration with Swedish Nuclear Fuel and Waste Management Company (SKB). One purpose of the measurement campaigns was to acquire passive gamma spectra with high-purity germanium and lanthanum bromide scintillation detectors from Pressurized Water Reactor and Boiling Water Reactor spent fuel assemblies. The absolute 137Cs count rate and the 154Eu/137Cs, 134Cs/137Cs, 106Ru/137Cs, and 144Ce/137Cs isotopic ratios were extracted; these values were used to construct corresponding model functions (which describe each measured quantity's behavior over various combinations of burnup, cooling time, and initial enrichment) and then were used to determine those same quantities in each measured spent fuel assembly. The results obtained in comparison with the operator declared values, as well as the methodology developed, are discussed in detail in the paper.

  11. Interim report on construction of data base for atomic energy science documents (concerning Kyoto University Reactor)

    International Nuclear Information System (INIS)

    Takeuchi, Takayuki

    1984-01-01

    The Kyoto University Research Reactor Institute was established in 1963 as a research institute for all universities in Japan utilizing the facilities in common. The construction of a document data base has been undertaken in commemoration of the 20th anniversary of the institute. The data base concerns the research works performed at the institute and also the publications and reports on the research made by the personnel belonging to the institute. Input data are gathered from concerned researchers. In this interim report, the structure and contents of this data base are shortly described. One of the features of this data base is that it handles data with both Japanese and English at the same time. (Aoki, K.)

  12. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  13. The cascad spent fuel dry storage facility

    International Nuclear Information System (INIS)

    Guay, P.; Bonnet, C.

    1991-01-01

    France has a wide variety of experimental spent fuels different from LWR spent fuel discharged from commercial reactors. Reprocessing such fuels would thus require the development and construction of special facilities. The French Atomic Energy Commission (CEA) has consequently opted for long-term interim storage of these spent fuels over a period of 50 years. Comparative studies of different storage concepts have been conducted on the basis of safety (mainly containment barriers and cooling), economic, modular design and operating flexibility criteria. These studies have shown that dry storage in a concrete vault cooled by natural convection is the best solution. A research and development program including theoretical investigations and mock-up tests confirmed the feasibility of cooling by natural convection and the validity of design rules applied for fuel storage. A facility called CASCAD was built at the CEA's Cadarache Nuclear Research Center, where it has been operational since mid-1990. This paper describes the CASCAD facility and indicates how its concept can be applied to storage of LWR fuel assemblies

  14. Interim assessment of the experience of fast neutron therapy in Edinburgh

    International Nuclear Information System (INIS)

    Duncan, W.; Arnott, S.J.

    1982-01-01

    Clinical studies of fast neutron therapy were started in Edinburgh in March 1977. The treatment facility has an isocentric machine and a fixed horizontal beam. The neutron beam is produced by 15 MeV deuterons on a thick beryllium target. Six hundred and forty-one patients have been included in these studies in the four-year period to March 1981. Randomly controlled trials have been conducted since May 1977 and 376 patients have been recruited in this period. The local tumor response rates and morbidity observed is given for trials of patients with cerebral gliomass, squamous carcinoma of the head and neck region, transitional cell carcinoma of the bladder and adenocarcinoma of the rectum. This interim evaluation does not demonstrate any advantage of fast neutron radiotherapy as compared with photon therapy. However, greater numbers of patients require to be studied and followed-up for longer intervals. A definitive assessment of the randomly controlled clinical trials in Edinburgh should be possible at the end of 1982

  15. Interim research assessment 2003-2005 - Computer Science

    NARCIS (Netherlands)

    Mouthaan, A.J.; Hartel, Pieter H.

    This report primarily serves as a source of information for the 2007 Interim Research Assessment Committee for Computer Science at the three technical universities in the Netherlands. The report also provides information for others interested in our research activities.

  16. An interim report on the State of Nevada socioeconomic studies

    International Nuclear Information System (INIS)

    1989-06-01

    This Interim Report is a report on work in progress and presents findings from the research to date on the potential consequences of a repository for the citizens of Nevada. The research and findings in the Report have been subjected to rigorous peer review as part of the state's effort to insure independent, objective analysis that meets the highest professional standards. The basic research effort will continue through June 1990 and will enable the state to refine and clarify the findings presented in this Interim Report

  17. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  18. Low-level liquid radioactive waste treatment at Murmansk, Russia: Technical design and review of facility upgrade and expansion

    International Nuclear Information System (INIS)

    Dyer, R.S.; Diamante, J.M.

    1996-07-01

    The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility's capacity from 1,200 m 3 per year to 5,000 m 3 per year, will permit the facility to process high-salt wastes from the Russian Navy's Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted

  19. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soil beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  20. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building