WorldWideScience

Sample records for faa technical manager

  1. NASA and FAA Programs in Air Traffic Management

    Science.gov (United States)

    Condon, Gregory W.

    1995-01-01

    This presentation will present an overview of NASA and joint NASA/FAA R&D programs related to Air Traffic Management. In addition it will address the plans for the new Advanced Air Transportation Technologies program, which will investigate methods for achieving the airline industries needs for increased flexibility in the nation's air traffic management system.

  2. Management Advisory Memorandum of FAA Service Agreement, JFK Control Tower

    Science.gov (United States)

    1997-02-12

    This Management Advisory Memorandum is in response to the Federal Aviation Administration's (FAA) request to audit costs claimed for Fiscal Year (FY) 1995 by the Port Authority of New York and New Jersey (Port Authority) related to Contract No. DTFA0...

  3. 77 FR 4219 - FAA-Approved Portable Oxygen Concentrators; Technical Amendment

    Science.gov (United States)

    2012-01-27

    ... CONTACT: For technical questions concerning this action, contact DK Deaderick, Air Transportation Division...; telephone: (202) 267-7480; email: DK[email protected] . For legal questions concerning this action, contact....gov . SUPPLEMENTARY INFORMATION: Background On July 12, 2005, the FAA published SFAR 106, ``Use of...

  4. FAA/NASA UAS Traffic Management Pilot Program (UPP)

    Science.gov (United States)

    Johnson, Ronald D.; Kopardekar, Parimal H.; Rios, Joseph L.

    2018-01-01

    NASA Ames is leading ATM R&D organization. NASA started working on UTM in 2012, it's come a long way primarily due to close relationship with FAA and industry. We have a research transition team between FAA and NASA for UTM. We have a few other RTTs as well. UTM is a great example of collaborative innovation, and now it's reaching very exciting stage of UTM Pilot Project (UPP). NASA is supporting FAA and industry to make the UPP most productive and successful.

  5. FAA Energy Order 1053.1A - Energy and Water Management Program For FAA Buildings and Facilities

    Science.gov (United States)

    1996-12-27

    This order provides Federal Aviation Administration (FAA) policies, procedures, and organizational responsibilities, in a focused and expanded agency energy and water planning and conservation program, for complying with the national mandates for the...

  6. Technical innovation and management

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Yang Cheol

    1982-08-15

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  7. Technical innovation and management

    International Nuclear Information System (INIS)

    Yoon, Yang Cheol

    1982-08-01

    This book gives explanations of the conception of technical innovation, development plan in Korea, connection between technology and a growth factor in national income, problem of technical innovation in developing country, analysis on cooperation between a developed country and a developing country, evaluation and strategy of technical development in Korea, technical innovation of industry, management of technical industry, analysis of special condition in Korea.

  8. Technical Training for Managers.

    Science.gov (United States)

    Haverland, Edgar M.

    The question has arisen as to what kind of information a manager without extensive technical training needs to learn to supervise effectively. For example, the Nike Hercules fire control platoon leader, usually an officer in his first active duty assignment, seldom has had extensive technical training. Yet he is responsibile for the…

  9. CSLAA and FAA'S Rules: Incorporating a 'Risk Management Framework' to Minimise Human Space Flight Risks

    Science.gov (United States)

    Chaddha, S.

    2012-01-01

    th This year marks the 50 anniversary of a landmark victory for humankind in its endeavour of entering and exploring the final frontier. During these years of space activity, we have witnessed a number of cumulative successes. One of which is the emergence of the commercial human space flight, or "space tourism", market. Commercial companies have the aim of travelling people into space safely and affordably. This paper shall consider the U.S. regulatory framework governing the space tourism market. It scrutinises the adequacy of the Commercial Space Launch and Amendment Act of 2004 (CSLAA), as bolstered by the FAA's requirements, to protect launching passengers to an acceptable standard of safety from the inherent risks associated with human space flights. It is argued that the legislative regime embeds a three-limb "risk management framework" as an appropriate response to address the concern over the safety of public space travel.

  10. Waste Management Technical Manual

    Energy Technology Data Exchange (ETDEWEB)

    Buckingham, J.S. [ed.

    1967-08-31

    This Manual has been prepared to provide a documented compendium of the technical bases and general physical features of Isochem Incorporated`s Waste Management Program. The manual is intended to be used as a means of training and as a reference handbook for use by personnel responsible for executing the Waste Management Program. The material in this manual was assembled by members of Isochem`s Chemical Processing Division, Battelle Northwest Laboratory, and Hanford Engineering Services between September 1965 and March 1967. The manual is divided into the following parts: Introduction, contains a summary of the overall Waste Management Program. It is written to provide the reader with a synoptic view and as an aid in understanding the subsequent parts; Feed Material, contains detailed discussion of the type and sources of feed material used in the Waste Management Program, including a chapter on nuclear reactions and the formation of fission products; Waste Fractionization Plant Processing, contains detailed discussions of the processes used in the Waste Fractionization Plant with supporting data and documentation of the technology employed; Waste Fractionization Plant Product and Waste Effluent Handling, contains detailed discussions of the methods of handling the product and waste material generated by the Waste Fractionization Plant; Plant and Equipment, describes the layout of the Waste Management facilities, arrangement of equipment, and individual equipment pieces; Process Control, describes the instruments and analytical methods used for process control; and Safety describes process hazards and the methods used to safeguard against them.

  11. Technical management courses (before July)

    CERN Multimedia

    2015-01-01

    Please find below the courses in the field of technical management scheduled before July and which have places available.       For more details about a course and to register, please go to the Training Catalogue. If you need a course which is not in the catalogue, please contact your supervisor, your Departmental Training Officer or HR-LD at Technical.Management.Training@cern.ch.

  12. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  13. FAA Center of Excellence for Alternative Jet Fuels & Environment : Annual Technical Report : December, 2016 : For the period September 13, 2013 - September 30, 2015

    Science.gov (United States)

    2015-12-01

    This report covers the period between the initial establishment of the FAA Center of Excellence for Alternative Jet Fuels and Environment on September 13, 2013 through September 30, 2015. The Center was established by the authority of FAA solicitatio...

  14. Ageing management technical information investigations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-15

    In February 2013, there are 50 units of commercial nuclear power plants (NPPs) in Japan. We enter into a period that 20 units of them are operating for more than 30 years. Currently, regulation imposes utilities to conduct ageing technical evaluations of each unit before operation of 30 years from the commissioning, to develop the long term maintenance management policy for next 10 years and to submit to the regulatory authority the policy with the report on ageing management technical evaluation (AMTE) for each NPP. It is necessary for regulatory side to develop technical information bases incorporating latest technical knowledge as operating experiences in domestic and abroad on ageing of the plants necessary to conduct reviews of AMTE for each unit. Based on these standpoints, technical information bases investigations have been conducted from the viewpoints of material degradation of ageing NPPs. In order to develop scientific regulator judgment bases related to ageing management (AM) and long-term operation (LTO), investigations on latest information on ageing management in domestic and abroad are conducted and a set of documents including technical evaluation review manuals necessary to conduct AMTE are prepared. To utilize the results of the investigations for ageing technical evaluation, database including latest information related to AM and LTO are developed, ran and operated. In addition, investigations related to Fugen nuclear plant, under decommissioning plants, investigations on mechanism of stress corrosion cracking (SCC), thermal ageing and preventive technologies for SCC, detection and diagnosis technology for ageing degradation and condition monitoring technology are performed to validate and confirm effectiveness of the technologies. (author)

  15. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  16. Management of technical information department

    Energy Technology Data Exchange (ETDEWEB)

    Kim, T H; Han, D H; Moon, H W [and others

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs.

  17. Management of technical information department

    International Nuclear Information System (INIS)

    Kim, T. H.; Han, D. H.; Moon, H. W.

    1997-03-01

    This report introduces technical information activities in 1996. They are composed of basic tasks and applied tasks. 1. Basic activities - acquisition, cataloging, and Information services 2. Management of KAERI-TIPS (Technical Information Processing System) 3. Construction of the database for nuclear-related Information 4. Role of Specialized Nuclear Information Center in the field of nuclear energy and cooperation with INIS section of IAEA 5. Beside above activities, in 1996 TID homepage was opened and online document delivery service was provided. (author). 25 tabs., 17 figs

  18. Technical approach to aging management

    International Nuclear Information System (INIS)

    Vora, J.P.; Johnson, A.B. Jr.; Allen, R.P.

    1992-10-01

    Systematic and effective control of age-related degradation of safety-related components, systems, and structures in nuclear power plants (NPPs) is an important challenge to plant operators. Several data bases, available to provide guidance on aging management, are summarized. However, the ultimate consideration is: How effectively is aging management being implemented at individual plants? Illustrated here is a specific strategy that served to develop the technical data base for the Nuclear Plant Aging Research Program. The strategy is comprehensive, systematic, and adaptable. Effective aging management at NPPs could be facilitated by a parallel strategy. The elements of a strategy are suggested

  19. 14 CFR 21.615 - FAA inspection.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false FAA inspection. 21.615 Section 21.615 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Technical Standard Order Authorizations § 21.615 FAA inspection. Upon the...

  20. Subjective evaluation with FAA criteria: A multidimensional scaling approach. [ground track control management

    Science.gov (United States)

    Kreifeldt, J. G.; Parkin, L.; Wempe, T. E.; Huff, E. F.

    1975-01-01

    Perceived orderliness in the ground tracks of five A/C during their simulated flights was studied. Dynamically developing ground tracks for five A/C from 21 separate runs were reproduced from computer storage and displayed on CRTS to professional pilots and controllers for their evaluations and preferences under several criteria. The ground tracks were developed in 20 seconds as opposed to the 5 minutes of simulated flight using speedup techniques for display. Metric and nonmetric multidimensional scaling techniques are being used to analyze the subjective responses in an effort to: (1) determine the meaningfulness of basing decisions on such complex subjective criteria; (2) compare pilot/controller perceptual spaces; (3) determine the dimensionality of the subjects' perceptual spaces; and thereby (4) determine objective measures suitable for comparing alternative traffic management simulations.

  1. Training of technical staff and technical staff managers

    International Nuclear Information System (INIS)

    Moody, G.F.

    1991-01-01

    The purpose of Technical Staff and Technical Staff Managers training is to provide job skills enhancement to individuals selected to fill key technical positions within a nuclear utility. This training is unique in that unlike other training programs accredited by the National Academy for Nuclear Training, it does not lead to specific task qualification. The problems encountered when determining the student population and curriculum are a direct result of this major difference. Major problems encountered are determining who should attend the training, what amount of training is necessary and sufficient, and how to obtain the best feedback in order to effect substantive program improvements. These topics will be explored and possible solutions discussed

  2. TWRS technical baseline database manager definition document

    International Nuclear Information System (INIS)

    Acree, C.D.

    1997-01-01

    This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager

  3. FAA Center of Excellence Alternative Jet Fuels & Environment : Annual Technical Report 2016 : For the Period October 1, 2015 - September 30, 2016

    Science.gov (United States)

    2016-09-01

    This report covers the period October 1, 2015 through September 30, 2016. The Center was established by the authority of FAA solicitation 13-C-AJFE-Solicitation. During that time the ASCENT team launched a new website, which can be viewed at https://...

  4. Talent management : Retaining and managing technical specialists in a technical career

    OpenAIRE

    Brunila, Alexandra; Baedecke Yllner, Emelie

    2013-01-01

    The purpose of this thesis is to investigate talent management and how companies should work with talent management in order to retain and manage technical specialists in a technical career. Talent management is found to be important for modern organizations because of the advent of the knowledge economy, new generations entering the workforce and the need for businesses to become more strategic and competitive, which implies new ways of managing human capital. Furthermore, talent management ...

  5. Project management training : [technical summary].

    Science.gov (United States)

    2011-01-01

    In 2005, the Indiana Department of Transportation (INDOT) went through a complete reorganization of its operations going from centralized to decentralized (District) management. This reorganization gave Districts autonomy to manage construction proje...

  6. FAA Directives System

    Science.gov (United States)

    1992-08-26

    Consistent with the Federal Aviation Administration's mission to foster a safe, : secure, and efficient aviation system is the need for an effective and efficient : process for communitcating policy and procedures. The FAA Directives System : provide...

  7. FAA Financial Requirements

    Science.gov (United States)

    1997-06-04

    In June 1995, the FAA developed a "total requirements" estimate for the period : FY 97-FY 02 to help explain the difficulty of supporting a dynamic, growing : aviation industry under a federal budget picture which projected flat or reduced : funding ...

  8. Proceedings of the FAA-NASA symposium on the continued airworthiness of aircraft structures : part 2

    Science.gov (United States)

    1997-07-01

    This publication contains the fifty-two technical papers presented at the FAA-NASA Symposium on the Continued Airworthiness of Aircraft Structures. The symposium, hosted by the FAA Center of Excellence for Computational Modeling of : Aircraft Structu...

  9. Proceedings of the FAA-NASA symposium on the continued airworthiness of aircraft structures : part 1

    Science.gov (United States)

    1997-07-01

    This publication contains the fifty-two technical papers presented at the FAA-NASA Symposium on the Continued Airworthiness of Aircraft Structures. The symposium, hosted by the FAA Center of Excellence for Computational Modeling of : Aircraft Structu...

  10. Managing mixed wastes: technical issues

    International Nuclear Information System (INIS)

    Lytle, J.E.; Eyman, L.D.; Burton, D.W.; McBrayer, J.F.

    1986-01-01

    The US Department of Energy manages wastes that are both chemically hazardous and radioactive. These mixed wastes are often unique and many have national security implications. Management practices have evolved over the more than forty years that the Department and its predecessor agencies have been managing these wastes, both in response to better understanding of the hazards involved and in response to external, regulatory influences. The Department has recently standarized its waste management practices and has initited an R and D program to address priority issues identified by its operating contractor organizations. The R and D program is guided by waste management strategy that emphasizes reduction of human exposure to hazardous wastes in the environment, reduction of the amount and toxicity of wastes generated, treatment of wastes that are generated to reduce volumes and toxicities, and identification of alternatives to land disposal of wastes that remain hazardous following maximum practicable treatment

  11. Discussion on enterprise technical standard management work

    International Nuclear Information System (INIS)

    Li Xinyou

    2010-01-01

    The technical standard management is an important part of enterprise information work, also the basis of enterprise standardization work. Only by rational and orderly management, can it exert maximum effectiveness, provide reliable support for the production and business of enterprise. (author)

  12. Crew Transportation Technical Management Processes

    Science.gov (United States)

    Mckinnie, John M. (Compiler); Lueders, Kathryn L. (Compiler)

    2013-01-01

    Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document, with its sister documents, International Space Station (ISS) Crew Transportation and Services Requirements Document (CCT-REQ-1130), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), Crew Transportation Operations Standards (CCT STD-1150), and ISS to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase.

  13. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    National Research Council Canada - National Science Library

    Pisano, N

    2002-01-01

    ...(A)), is known as the Navy PEO(A) Technical Performance Measurement (TPM) System. A retrospective analysis was conducted on the T45TS Cockpit-21 program and real-time test implementations are being conducted on the Federal Aviation Administration's (FAA...

  14. Technical management of difference in CEPR nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2014-01-01

    The Thesis dissertate the application of technical management of difference in CEPR Nuclear Power Project from EPR technical bases, condition of a nuclear power plant site, engineering and procurement, construction, quality management, schedule management and experience feedback aspects. (author)

  15. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  16. Technical and Management Information System (TMIS)

    Science.gov (United States)

    Rau, Timothy R.

    1987-01-01

    The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.

  17. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  18. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  19. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  20. Technical considerations in materials management policy development

    International Nuclear Information System (INIS)

    Avci, H.; Goldberg, M.

    1996-01-01

    Under the Materials-in-Inventory (MIN) initiative, US DOE intends to develop policies to ensure that materials are managed and use efficiently, cost-effectively, and safely throughout DOE. The MIN initiative covers depleted uranium, scrap metals, chemicals, explosives, spent nuclear fuel, lead, alkali metals, etc.; by far the largest component is depleted uranium hexafluoride (DUF6). A technically defensible approach has been developed and is being used to select a long-term management strategy for DOE's DUF6 inventory. The same approach can be adapted to management of other materials in inventory that have the potential to be reutilized

  1. FAA Loran early implementation project

    Science.gov (United States)

    1990-03-01

    The Early Implementation Project (EIP), established by FAA Administrator Admiral : Donald C. Engen, was the initial step in the process of Loran integration into the : National Airsace System (NAS). The EIP was designed to give the FAA and the Loran ...

  2. A qualitative phenomenological study: Enhanced, risk-based FAA oversight on part 145 maintenance practices

    Science.gov (United States)

    Sheehan, Bryan G.

    The purpose of this qualitative phenomenological study was to examine the phenomenon of enhanced, risk-based Federal Aviation Administration (FAA) oversight of Part 145 repair stations that performed aircraft maintenance for Part 121 air carriers between 2007 and 2014 in Oklahoma. Specifically, this research was utilized to explore what operational changes have occurred in the domestic Part 145 repair station industry such as variations in management or hiring practices, training, recordkeeping and technical data, inventory and aircraft parts supply-chain logistics, equipment, and facilities. After interviewing 12 managers from Part 145 repair stations in Oklahoma, six major theme codes emerged from the data: quality of oversight before 2007, quality of oversight after 2007, advantages of oversight, disadvantages of oversight, status quo of oversight, and process improvement . Of those six major theme codes, 17 subthemes appeared from the data that were used to explain the phenomenon of enhanced oversight in the Part 145 repair station industry. Forty-two percent of the participants indicated a weak FAA oversight system that has hindered the continuous process improvement program in their repair stations. Some of them were financially burdened after hiring additional full-time quality assurance inspectors to specifically manage enhanced FAA oversight. Notwithstanding, the participants of the study indicated that the FAA must apply its surveillance on a more standardized and consistent basis. They want to see this standardization in how FAA inspectors interpret regulations and practice the same quality of oversight for all repair stations, particularly those that are repeat violators and fail to comply with federal aviation regulations. They believed that when the FAA enforces standardization on a consistent basis, repair stations can become more efficient and safer in the performance of their scope of work for the U.S. commercial air transportation industry.

  3. Risk management through dynamic technical specifications

    International Nuclear Information System (INIS)

    Klopp, George T.; Petersen, Thomas A.

    2004-01-01

    The wide deployment of plant specific probabilistic risk assessments for nuclear power plants has provided the means to effect a fresh risk management perspective and a fresh, risk based, regulatory outlook on nuclear power. There has been a great deal of conversation on risk based regulation within the U. S. nuclear power industry but, curiously, very little on effective risk management. This paper proposes a means to link the two subjects through the plant Technical Specifications. A revised concept for Technical Specifications is suggested which is based on deterministic analyses and probabilistic risk assessments for each plant. The revised Technical Specifications would consider, on a real-time basis, the exact state of the plant in terms of the status of key components and systems. It would depict current plant risk levels and compare those levels to the desired and limiting (alert/action) levels. It would advise the plant operator on the risk impact of proposed actions through a simple query system and illustrate the impact of such actions on plant status relative to designated risk values. The basis for the proposed approach lies in realistic deterministic plant analyses and probabilistic risk assessment (PRA) deployment tools being developed, in parallel, by a number of parties in the U.S. today. These PRAs are based primarily on the existing plant responses to Generic Letter 88-20, 'Individual Plant Examinations' (IPEs). Each of these tools allows the plant operator to input, on a real-time basis, the status of key equipment and systems. The tools then provide explicit illustrations of dependency effects; updated, 'real-time' risk status indications such as core damage frequency; and, in some cases, allow the operator to assess the risk impact of removing from service selected components for maintenance or testing. These systems generally operate on personal computers and provide nearly instantaneous responses to plant queries. Moving from these tools to

  4. Federal Aviation Administration (FAA) Reauthorization : an overview of legislative action in the 111th Congress

    Science.gov (United States)

    2009-10-08

    This report tracks the status of ongoing legislative action and debate related to FAA : reauthorization. It is organized into six major program areas: aviation system finance; airport : financing; FAA management and organizational issues; system capa...

  5. The Future of Project Management in Technical Communication

    DEFF Research Database (Denmark)

    Kampf, Constance

    2006-01-01

    Project Management increasing shapes workplace communication, especially when technical commuicators participate in cross-disciplinary development teams. This paper looks at the future of project management in technical communication and argues for a communicative approach to project management...... for technical communication students. The Project Management course in the International Bachelor Program of Marketing and Management Communication at the Aarhus School of Business is described, and the implications fortechnical communication curricula are discussed....

  6. Technical information management in an emergency response

    International Nuclear Information System (INIS)

    Berry, H.A.; Greve, C.; Best, R.G.; Phillipson, D.S.

    1991-01-01

    Through many experiences in responding to real radiation accidents and emergency response exercises, the Department of Energy (DOE) has developed a technical information management system that will be used in the Federal Radiological Monitoring and Assessment Center (FRMAC) in the event of a major radiological accident. The core of the system is the Data Center in the FRMAC, utilizing a computerized database of all off-site environmental radiological data. The information contained and managed by the Data Center will be comprehensive, accountable, and traceable, providing information to the assessors for immediate health and safety needs as well as for long-term documentation requirements. A DOE task force has been formed to develop compatibility guidelines for video, automated data processing, and communication systems. An electronic mail, information status, and bulletin board system is also being developed to assist in the dissemination of information. Geographic Information Systems (GIS) offer a giant step forward in displaying and analyzing information in a geographically referenced system

  7. Technical Facilities Management, Loan Pool, and Calibration

    Science.gov (United States)

    Smith, Jacob

    2011-01-01

    My work at JPL for the SURF program began on June 11, 2012 with the Technical Facilities Management group (TFM). As well as TFM, I worked with Loan Pool and Metrology to help them out with various tasks. Unlike a lot of other interns, I did not have a specific project rather many different tasks to be completed over the course of the 10 weeks.The first task to be completed was to sort through old certification reports in 6 different boxes to locate reports that needed to be archived into a digital database. There were no reports within these boxes that needed to be archived but rather were to be shredded. The reports went back to the early 1980's and up to the early 2000's. I was looking for reports dated from 2002 to 2012

  8. The future of technical knowledge management

    International Nuclear Information System (INIS)

    Kang, C.-S.

    2005-01-01

    The sustainable development of nuclear energy can only be achieved by establishing the global nuclear safety regime. The effective management of technical knowledge will become one of the issues and challenges in establishing the global nuclear safety. We have to develop the measures to identify the nature and scope of associated problems and to explore the cooperative international actions to resolve them. The future of its effective management will depend on how to optimize the transfer and deployment of the knowledge as well as how to maintain the knowledge base. In this presentation, two specific topics are discussed: sharing of the knowledge and preservation of the workforce. In sharing the knowledge, topics are assurance of free flow of safety-related R and D information from developed to developing countries and potential imposition of a strong trade agreement between nuclear exporting and importing countries to ensure the safety. In preserving the workforce, topics are development of the knowledge transfer system from this generation to the next like a forum of IYNC, enforcement of regional and international educational systems like ANENT and WNU for workforce development, and exploration of optimal mechanism in using retired workforce. The publication of the world-wide directory of nuclear professionals, aggressive implementation of the youth internship program and introduction of the international professional certification program are also discussed. The reformation of CNS as a more enforcing and binding agreement in keeping the safety along with the introduction of 'Global Nuclear Safety Treaty' could be an excellent mechanism of achieving an effective knowledge management and eventually enforcing the global safety regime. IAEA has always been the corroborator of maintaining high levels of nuclear safety through close international nuclear cooperation. These important roles of IAEA should continue to be emphasized more than ever in order to secure the

  9. Logistic management materials-technical support railway enterprises

    OpenAIRE

    Dykan, V.; Borozenetc, T.

    2014-01-01

    The essence of logistics management. Determine the feasibility of applying the principles of logistics management in organizing the logistics of railway transport. Discussed measures to develop suppliers in the implementation of logistics management logistics. Identified the need to develop and implement regulatory and methodical system to improve materials-technical support through the introduction of modern logistics principles. Applied systemic campaign to organize the materials-technical ...

  10. 41 CFR 102-33.230 - May we use military FSCAP on non-military FAA-type certificated Government aircraft?

    Science.gov (United States)

    2010-07-01

    ... FSCAP on non-military FAA-type certificated Government aircraft? 102-33.230 Section 102-33.230 Public... Aircraft Parts Managing Aircraft Parts § 102-33.230 May we use military FSCAP on non-military FAA-type... installation by the FAA. See detailed guidance in FAA Advisory Circular 20-142, “Eligibility and Evaluation of...

  11. Technical Literature Review Concerning Management Information Systems.

    Science.gov (United States)

    interrelationships of the many aspects of management information systems (MIS); that is, with how analysis, design, operation, evaluation, and user considerations affect management information systems . (Author)

  12. Integrated Measurement of Crew Resource Management and Technical Flying Skills

    Science.gov (United States)

    1993-08-01

    This report presents the findings of a study designed with two objectives: to produce a prototype performance : measurement instrument (PMI) that integrates the assessment of Crew Resource Management (CRM) and technical flying : skills and to investi...

  13. Technical career opportunities in high-level radioactive waste management

    International Nuclear Information System (INIS)

    1993-01-01

    Technical career opportunities in high-level radioactive waste management are briefly described in the areas of: Hydrology; geology; biological sciences; mathematics; engineering; heavy equipment operation; and skilled labor and crafts

  14. The Office of Environmental Management technical reports: A bibliography

    International Nuclear Information System (INIS)

    1996-01-01

    The Office of Environmental Management's (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1994 through June 30, 1995. This information is divided into the following categories: Focus Areas, Cross-Cutting Programs, and Support Programs. In addition, a category for general information is included. EM's Office of Science and Technology sponsors this bibliography

  15. Should Project Managers Buy Technical Data

    Science.gov (United States)

    2017-04-06

    the future. The research also exposed perspective organizational viewpoints on what technical data rights are needed and what analysis is available...DAU professor Dr. John Larson. To conclude, this research project was completed with tremendous love and support from my family . Address any...Study ........................................................................................................... 2 Significance of This Research

  16. 41 CFR 102-37.530 - What are FAA's responsibilities in the donation of surplus property to public airports?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are FAA's... § 102-37.530 What are FAA's responsibilities in the donation of surplus property to public airports? In the donation of surplus property to public airports, the Federal Aviation Administration (FAA), acting...

  17. Technical strategy map to employing nuclear power plant aging management

    International Nuclear Information System (INIS)

    Sekimura, Naoto; Kanno, Masanori

    2008-01-01

    Stated in this report are back ground of technical strategy map for nuclear power plant aging management, result of the first road map, significance of technical strategy map, introduction scenario, technology map, road map, upgrade in every year, three groups of academia, industry and government, plan of technical strategy map, upgrade system, comprehensive introduction scenario, measures of nuclear power plant aging management in Japan and the world, new inspection system, outline of 'technical strategy map 2008', preparation of technical information bases in industry, academia and government, collaboration of them, safety researches of neutron radiation damage, stress corrosion crack, fatigue, piping thinning, insulation degradation, concrete degradation, thermal aging, evaluation technologies of earthquake resistance, preparation of rules and standards, ideal maintenance, and training talent. (S.Y.)

  18. Software configuration management plan for the Hanford site technical database

    International Nuclear Information System (INIS)

    GRAVES, N.J.

    1999-01-01

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system

  19. Technical merits and leadership in facility management

    OpenAIRE

    Shoemaker, Jerry J

    1997-01-01

    After almost ten years of experience and formal education in design, construction, and facility operations and maintenance, the challenges and complexity of facility management still seem overwhelming and intangible. This document explores those complexities and challenges, and presents several philosophies and strategies practiced in facility management. The document is divided into six chapters; the introduction, facility management and leadership, building systems, facility operations, fac...

  20. 1993 DOE technical standards managers workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This workshop is focused on the benefits of the DOE technical standards program, which is focused toward the preferred use of non-Government standards for DOE activities and the development of DOE technical standards when non-Government standards are not available or are inappropriate. One goal of the program is to replace redundant site-specific standards with more universally accepted documents that have been scrutinized by experts. This replacement is discussed at the workshop along with the problems encountered and solutions found. The workshop provided an opportunity for geographically dispersed people to meet and advance their standards knowledge and efforts to support the program. Safety issues have been the driving force behind the program to date. Several companies offer products and services that support the development, processing, and retrieval of standards. This document mostly comprise vugraphs.

  1. Technical Merits and Leadership in Facility Management

    National Research Council Canada - National Science Library

    Shoemaker, Jerry

    1997-01-01

    .... The document is divided into six chapters; the introduction, facility management and leadership, building systems, facility operations, facility maintenance strategies, and the conclusion and final analysis...

  2. The Office of Environmental Management technical reports: a bibliography

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

  3. The Office of Environmental Management technical reports: a bibliography

    International Nuclear Information System (INIS)

    1997-07-01

    The Office of Environmental Management''s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM''s Office of Science and Technology sponsors this bibliography

  4. Technical Merits and Leadership in Facility Management

    National Research Council Canada - National Science Library

    Shoemaker, Jerry

    1997-01-01

    After almost ten years of experience and formal education in design, construction, and facility operations and maintenance, the challenges and complexity of facility management still seem overwhelming and intangible...

  5. 14 CFR 145.223 - FAA inspections.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false FAA inspections. 145.223 Section 145.223... OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.223 FAA inspections. (a) A certificated repair station must allow the FAA to inspect that repair station at any time to determine...

  6. 14 CFR 157.7 - FAA determinations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false FAA determinations. 157.7 Section 157.7... NOTICE OF CONSTRUCTION, ALTERATION, ACTIVATION, AND DEACTIVATION OF AIRPORTS § 157.7 FAA determinations. (a) The FAA will conduct an aeronautical study of an airport proposal and, after consultations with...

  7. The Office of Environmental Management technical reports: A bibliography

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995--that were published from October 1, 1996--September 30, 1997. This information is divided into the following categories: Miscellaneous, Focus Areas and Crosscutting Programs, Support Programs, Technology Integration and International Technology Exchange, are now included in the Miscellaneous category. The Office of Environmental Management within the Department of Energy (DOE) is responsible for environmental restoration, waste management, technology development and facility transition and management. Subjects include: subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations. 880 refs.

  8. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  9. Technical support and management systems for nuclear power stations

    International Nuclear Information System (INIS)

    Oya, Tadashi; Abe, Norihiko

    1990-01-01

    Sophisticated automatic monitoring and control capabilities and computerized operation management are needed in nuclear power plants to boost plant safety and availability and to reduce operating costs. The article covers the areas of operation management and maintenance management within the larger category of operational administration. The concept of technical administration support-that is, the use of computerization to support the on-site technician's operations-is introduced. The article also suggests the direction of future development. (author)

  10. Economic versus technical approaches to frequency management

    DEFF Research Database (Denmark)

    Falch, Morten; Tadayoni, Reza

    2004-01-01

    to demonstrate how regulators could incorporate an econmic dimension into frequency allocation. The paper concludes that a free market approach is still not possible for some parts of the frequency management process; in short term, regulators must therefore continue to prioritize between applications....

  11. Texas Instruments Technical Seminar: Power Management and Wireless

    CERN Multimedia

    2006-01-01

    Monday 6 November TECHNICAL TRAINING SEMINAR 14:00 to 17:30 - Training Centre Auditorium (bldg. 593) Texas Instruments Technical Seminar: Power Management and Wireless Michael Scholtholt, Field Application Engineer / TEXAS INSTRUMENTS (US, D, CH) The range of power management products available today offers the possibility to find the best solution for each application. To select the right product it is therefore necessary to understand system requirements, how power supply products work, and where they differentiate. This Technical Training Seminar will also present an overview of how to choose the right RF platform based on markets and applications: nowadays almost everbody has at least one wireless product in use, and this tendency seems to increase significantly. Power Management Voltage mode vs. current mode control Differentiating DC/DC converters by analyzing control and compensation schemes: line / load regulation, transient response, BOM, board space, ease-of-use Introduction to evaluati...

  12. Texas Instruments Technical Seminar: Power Management and Wireless

    CERN Multimedia

    2006-01-01

    Monday 6 November TECHNICAL TRAINING SEMINAR 14:00 to 17:30 - Training Centre Auditorium (bldg. 593) Texas Instruments Technical Seminar: Power Management and Wireless Michael Scholtholt, Field Application Engineer / TEXAS INSTRUMENTS (US, D, CH) The range of power management products available today offers the possibility to find the best solution for each application. To select the right product it is therefore necessary to understand system requirements, how power supply products work, and where they differentiate. This Technical Training Seminar will also present an overview of how to choose the right RF platform based on markets and applications: nowadays almost everbody has at least one wireless product in use, and this tendency seems to increase significantly. Power Management Voltage mode vs. current mode control Differentiating DC/DC converters by analyzing control and compensation schemes: line / load regulation, transient response, BOM, board space, ease-of-use Introduction to evalu...

  13. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  14. Low-level waste management program: technical program overview

    International Nuclear Information System (INIS)

    Lowrie, R.S.

    1981-01-01

    The mission of the technical program is to develop the technology component of the Department of Energy's Low-Level Waste Management Program and to manage research and development, demonstration, and documentation of the technical aspects of the program. Some of the major technology objectives are: develop and demonstrate techniques for waste generation reduction; develop and demonstrate waste treatment, handling and packaging techniques; develop and demonstrate the technology for greater confinement; and develop the technology for remedial action at existing sites. In addition there is the technology transfer objective which is to compile and issue a handbook documenting the technology for each of the above technology objectives

  15. Technical assistance contractor management plan: Surface and ground water

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  16. Do technical skills correlate with non-technical skills in crisis resource management: a simulation study.

    Science.gov (United States)

    Riem, N; Boet, S; Bould, M D; Tavares, W; Naik, V N

    2012-11-01

    Both technical skills (TS) and non-technical skills (NTS) are key to ensuring patient safety in acute care practice and effective crisis management. These skills are often taught and assessed separately. We hypothesized that TS and NTS are not independent of each other, and we aimed to evaluate the relationship between TS and NTS during a simulated intraoperative crisis scenario. This study was a retrospective analysis of performances from a previously published work. After institutional ethics approval, 50 anaesthesiology residents managed a simulated crisis scenario of an intraoperative cardiac arrest secondary to a malignant arrhythmia. We used a modified Delphi approach to design a TS checklist, specific for the management of a malignant arrhythmia requiring defibrillation. All scenarios were recorded. Each performance was analysed by four independent experts. For each performance, two experts independently rated the technical performance using the TS checklist, and two other experts independently rated NTS using the Anaesthetists' Non-Technical Skills score. TS and NTS were significantly correlated to each other (r=0.45, P<0.05). During a simulated 5 min resuscitation requiring crisis resource management, our results indicate that TS and NTS are related to one another. This research provides the basis for future studies evaluating the nature of this relationship, the influence of NTS training on the performance of TS, and to determine whether NTS are generic and transferrable between crises that require different TS.

  17. Tele-maintenance 'intelligent' system for technical plants result management

    International Nuclear Information System (INIS)

    Concetti, Massimo; Cuccioletta, Roberto; Fedele, Lorenzo; Mercuri, Giampiero

    2009-01-01

    The management of technical plant for productivity and safety is generally a complex activity, particularly when many plants distributed in the territory are considered (i.e. the more and more frequent case of outsourced plants maintenance by specialized companies), granted quality and cost results are required (i.e. the case of some rather innovative contract solutions) and the technology involved is heterogeneous and innovative (i.e. electro-mechanical plants). In order to efficiently achieve the above aims an 'intelligent' maintenance-management system for the distant monitoring and controlling by a remote control center has been developed. The so-called GrAMS (granted availability management system) system is conceived to give to organizations involved in technical-industrial plants management the possibility to tend to a 'well-known availability' and 'zero-failures' management. In particular, this study deals with the diagnostic aspects and safety level of technical plants (such as elevators, thermo-technical plants, etc.), and with the involvement of ad hoc designed software analysis tools based on neural networks and reliability indicators. Part of the research dealing with the tele-maintenance intelligent system has been financed by the Italian High Institute for Safety (ISPESL) and led to the development of a pre-industrial prototype whose realization and testing is here described

  18. FAA computer security : concerns remain due to personnel and other continuing weaknesses

    Science.gov (United States)

    2000-08-01

    FAA has a history of computer security weaknesses in a number of areas, including its physical security management at facilities that house air traffic control (ATC) systems, systems security for both operational and future systems, management struct...

  19. Technical and institutional capacity in local organisations to manage ...

    African Journals Online (AJOL)

    Technical and institutional capacity in local organisations to manage decentralised forest resources in Uganda. ... Southern Forests: a Journal of Forest Science ... to implement decentralised forest governance exists in local organisations through partnerships with other actors in the productive use of the available resources.

  20. Ohio Marketing Management and Research. Technical Competency Profile (TCP).

    Science.gov (United States)

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document provides a framework for a broad-based secondary and postsecondary curriculum to prepare students for employment in marketing management and research (MMR). The first part of the technical competency profile (TCP) contains the following items: an explanation of the purpose and scope of Ohio's TCPs; college tech prep program…

  1. Report format preferences of technical managers and nonmanagers

    Science.gov (United States)

    Pinelli, T. E.; Cordle, V. M.; Glassman, M.; Vondran, R. F., Jr.

    1984-01-01

    A survey of engineers and scientists concerning the format of NASA technical reports indicates that a summary as well as an abstract should be included, that the definitions of symbols and glossary of terms should be located in the front of the report, and that the illustrative material should be integrated with the text rather than grouped at the end of the report. Citation of references by number, one-column, ragged-right-margin layout, and third-person writing style are also preferred by a majority of the respondents. The preferences of managers and nonmanagers are very similar for all aspects of technical report format covered by the survey.

  2. The cloud security ecosystem technical, legal, business and management issues

    CERN Document Server

    Ko, Ryan

    2015-01-01

    Drawing upon the expertise of world-renowned researchers and experts, The Cloud Security Ecosystem comprehensively discusses a range of cloud security topics from multi-disciplinary and international perspectives, aligning technical security implementations with the most recent developments in business, legal, and international environments. The book holistically discusses key research and policy advances in cloud security - putting technical and management issues together with an in-depth treaties on a multi-disciplinary and international subject. The book features contributions from key tho

  3. Federal Aviation Administration (FAA airworthiness certification for ceramic matrix composite components in civil aircraft systems

    Directory of Open Access Journals (Sweden)

    Gonczy Stephen T.

    2015-01-01

    Full Text Available Ceramic matrix composites (CMCs are being designed and developed for engine and exhaust components in commercial aviation, because they offer higher temperature capabilities, weight savings, and improved durability compared to metals. The United States Federal Aviation Administration (FAA issues and enforces regulations and minimum standards covering the safe manufacture, operation, and maintenance of civil aircraft. As new materials, these ceramic composite components will have to meet the certification regulations of the FAA for “airworthiness”. The FAA certification process is defined in the Federal Aviation Regulations (Title 14 of the Code of Federal Regulations, FAA policy statements, orders, advisory circulars, technical standard orders, and FAA airworthiness directives. These regulations and documents provide the fundamental requirements and guidelines for design, testing, manufacture, quality assurance, registration, operation, inspection, maintenance, and repair of aircraft systems and parts. For metallic parts in aircraft, the FAA certification and compliance process is well-established for type and airworthiness certification, using ASTM and SAE standards, the MMPDS data handbook, and FAA advisory circulars. In a similar manner for polymer matrix composites (PMC, the PMC industry and the FAA have jointly developed and are refining parallel guidelines for polymer matrix composites (PMCs, using guidance in FAA circulars and the CMH-17 PMC handbook. These documents discuss design methods and codes, material testing, property data development, life/durability assessment, production processes, QA procedures, inspection methods, operational limits, and repairs for PMCs. For ceramic composites, the FAA and the CMC and aerospace community are working together (primarily through the CMH-17 CMC handbook to define and codify key design, production, and regulatory issues that have to be addressed in the certification of CMC components in

  4. Technical report from Radioactive Waste Management Funding and Research Center

    International Nuclear Information System (INIS)

    2007-10-01

    As the only one Japanese organization specialized in radioactive waste, RWMC (Radioactive Waste Management Funding and Research Center) has been conducting the two major roles; R and D and the fund administration for radioactive waste management. The focus of its studies includes land disposal of LLW (Low-level radioactive wastes) and it has gradually extended to research on management and disposal techniques for high-level (HLW) and TRU wastes and studies on securing and managing the funds required for disposal of these wastes. The present document is the yearly progress report of 2006 and the main activities and research results are included on spent fuel disposal techniques including radon diffusion and emanation problem, performance studies on underground facilities for radioactive waste disposal and its management, technical assessment for geological environment, remote control techniques, artificial barrier systems proposed and its monitoring systems, and TRU disposals. (S. Ohno)

  5. Places available - Technical management courses (up to end July)

    CERN Multimedia

    2015-01-01

    Please find below the courses in the field of technical management scheduled up to the end of July and which have places available.       For more details about a course and to register, please go to the Training Catalogue. If you need a course that is not in the catalogue, please contact your supervisor, your Departmental Training Officer or the HR-LD group at Communication.Training@cern.ch.  

  6. 41 CFR 102-75.420 - What happens if the FAA informs the disposal agency that it does not recommend disposal of the...

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What happens if the FAA... Real Property Disposal Property for Public Airports § 102-75.420 What happens if the FAA informs the... property that the FAA does not recommend for disposal as a public airport must be disposed of in accordance...

  7. Life cycle assessment of waste management systems: Assessing technical externalities

    DEFF Research Database (Denmark)

    Brogaard, Line Kai-Sørensen

    The life cycle assessment (LCA) of a waste management system relies on many internal characteristics such as pollution control systems and recovery efficiencies. It also relies on technical externalities supporting the waste management system in terms of capital goods and energy and material...... for the primary and secondary production of materials, 366 datasets were gathered. The materials in focus were: paper, newsprint, cardboard, corrugated board, glass, aluminium, steel and plastics (HDPE, LDPE, LLDPE, PET, PS, PVC). Only one quarter of these data concerned secondary production, thus underlining...

  8. Selection of Technical Solutions for the Management of Radioactive Waste

    International Nuclear Information System (INIS)

    2017-07-01

    The objectives of this publication are to identify and critically review the criteria to be considered while selecting waste management technologies; summarize, evaluate, rank and compare the different technical solutions; and offer a systematic approach for selecting the best matching solution. This publication covers the management of radioactive waste from all nuclear operations, including waste generated from research reactors, power reactors, and nuclear fuel cycle activities including high level waste (HLW) arising from reprocessing and spent nuclear fuel declared as waste (SFW), as well as low level waste (LLW) and intermediate level waste (ILW) arising from the production and use of radionuclides in industry, agriculture, medicine, education and research.

  9. 14 CFR 169.5 - FAA determination.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false FAA determination. 169.5 Section 169.5 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRPORTS EXPENDITURE OF FEDERAL FUNDS FOR NONMILITARY AIRPORTS OR AIR NAVIGATION FACILITIES THEREON § 169.5 FAA...

  10. Technical modifications and management innovations in exporting nuclear reactor projects

    International Nuclear Information System (INIS)

    Mao Xiaoming; Qin Xijiu; Ding Hu; Xue Zhaoqun; Wen Shengjun

    2009-01-01

    As a main channel for the foreign economic cooperation of China nuclear industry, China Zhongyuan Engineering Corporation (CZEC) has been constantly engaged in technical modifications and management innovations in its exporting nuclear reactor projects. In the implementation of heavy water research reactor contract in Algeria, CZEC had established a complete and adequate design standards system in compliance with the international standards, and made significant modifications to the reference reactor in the aspects of reactor power and reactor safety, solved quite some technical issues which-affected the reactor technical performance. The modifications and improvements enabled the technical parameters, safety features, reactor multipurpose application to attain to the advanced level in the world. In the 300 MWe PWR NPPs in Pakistan, safety features had been updated in line with upgrading regulatory requisites. The design philosophy and technology application demonstrated CZEC' s creation and innovation on basis of constant safety enhancement of nuclear power projects. Efforts had also been made by CZEC' s creation and innovation on basis of constant safety enhancement of nuclear power projects. Efforts had also been made by CZEC in promoting China made equipment items and components exportation. (authors)

  11. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  12. Airway management by the general practitioner in trauma patients. Technical and non-technical skills

    Directory of Open Access Journals (Sweden)

    Juan David Dominguez-Sánchez

    2016-07-01

    Full Text Available General practitioners must constantly face challenges imposed by their profession when performing interventions that are necessary for their patients. Many of these interventions not only require proper use of theoretical knowledge, but also putting into practice non-technical and psychomotor skills developed through professional training. Given the specific characteristics of each patient, the clinical setting in the which procedure takes place and the limited skills of the professional, the management of the airway of a patient with trauma injuries in the emergency room represents a major challenge for physicians.

  13. Role of the Technical Information Center in the knowledge management

    International Nuclear Information System (INIS)

    Morales, Alfredo; Marrero, Carmen; Aguero, Manuel

    1999-01-01

    Competitive advantage of companies is directly proportional to their capacity for creating, capturing, handling, inventorying, transferring information, and generating knowledge, as well as for implementing best practices, in order to add value to the production process. Creation of an environment that allows carrying out this process efficiently, constitutes a transcendental step toward the systematic and useful application of knowledge management. This paper presents the role of Technical Information Centers, as entities which provide and integrate information and knowledge, within knowledge communities. The Technical Information Center (CIT for the Spanish: Centro de Information Tecnica) of PDVSA-Intevep and its contribution to strengthen the corporate technological intelligence through the information analysis and technical-scientific knowledge diffusion is also analyzed. The petrochemical and petroleum information network (RIPPET) and its data base RIPPET (from the Spanish Red de Informacion Petrolera y Petroquimica), coordinate by the CIT, and the CIT on line, a virtual organization, are also presented. Both are tools which facilitate the transfer of information and knowledge to communities organized within the company to manage knowledge

  14. FAA aviation forecasts : fiscal years 1997-2008

    Science.gov (United States)

    1997-03-01

    This report contains the Fiscal Years 1997-2008 Federal Aviation Administration (FAA) forecasts of aviation activity at FAA facilities. These include airports with both FAA and contract control towers, air route traffic control centers, and flight se...

  15. S Plant Aggregate Area Management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document is prepared in support of an Aggregate Area Management Study of S Plant, 200 West Area, at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. It provides a technical baseline of the aggregate area and the results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC). This document is based on review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. This report describes the REDOX facility and its waste sites, including cribs, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, underground tank farms designed for high-level liquid wastes, and the lines and encasements that connect them

  16. Z plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document was prepared in support of the development of a Aggregate Area Management Study of Z Plant, 200 West Area, at the US Department of Energy (DOE) Hanford Site near Richland, Washington. It provides a technical description and operational history of the aggregate area and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC) which is currently the Waste Site and Facility Research Office, Natural Resources, Bechtel Hanford, Inc. (BHI). It is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted in support of this report

  17. Management of People by Managers with a Technical Background - Research Results

    Directory of Open Access Journals (Sweden)

    D. Dobrovská

    2001-01-01

    Full Text Available In 1999 and 2000, the Masaryk Institute of Advanced studies of CTU in Prague launched a study of the efficiency of human resource management in Czech enterprises, with emphasis on technically educated managers. About 85 managers, each responsible for 5-250 employees assessed their own HRM activities and attitudes and those of their firm. The following aspects were analysed: evaluating individual management areas, assessing the general management standard of the given company, awareness of the company's personnel management policy, manager's own contribution to formulating the company's personnel management strategy, developing job descriptions, using professional methods of employee selection, promoting employees to the status of manager, periodic assessment of employees, training of staff responsible for assessment, employee remuneration and other motivation tools, etc. Results and data analysis are given in the paper. The managers of the Czech companies reviewed are still involved mainly in operating management, and devote limited time to the conceptual work needed in order to formulate an integral company policy in the area of personnel management. On the basis of this analysis, further training for managers with technical education will be designed and organised by the Masaryk Institute of Advanced Studies.

  18. How to manage a claim for medical and technical error

    International Nuclear Information System (INIS)

    Nguyen, T.D.

    2012-01-01

    Purpose. - The fast modifications in French medical legislation, the increasing number of litigations and the professional consequences for the practitioner warrant the necessity to recall the 'how to manage' a claim for medical error. Patients and methods. - Four cases of legal action against oncologists are presented. Results and discussion. - The importance of quality and traceability of the given information, the essential pieces of the medical file, the description of the different process steps and of the contradictory meeting are presented and discussed. Conclusion. - Beyond the control of medical and technical risks, the practitioners in general and the radiation oncologist in particular should learn on the daily management of the risk related to medical claim. (authors)

  19. FAA Flight Plan 2009-2013

    Science.gov (United States)

    2009-01-01

    The Flight Plan is the strategic plan for the agency, the plan to help us prepare for the future. The majority of FAAs responsibilities are our core functionsour everyday roles and responsibilitieswhich are not specifically highlighted in th...

  20. Aviation safety courses available through the FAA.

    Science.gov (United States)

    2009-02-02

    The FAA Civil Aerospace Medical Institute (CAMI) offers a 1-day training course to familiarize U.S. civil aviation pilots and flight crews with the physiological and psychological stresses of flight. Pilots who are knowledgeable about physiological p...

  1. FAA Certificated Maintenance Agencies Directory (1997)

    Science.gov (United States)

    1997-05-06

    This advisory circular (AC) transmits a consolidated directory of all : certificated Federal Aviation Administration (FAA) repair stations and : manufacturer's maintenance facilities. The repair stations and manufacturer's : maintenance facilities we...

  2. FAA Helicopter/Vertiport Lighting Conference - Proceedings

    National Research Council Canada - National Science Library

    Smith, Robert

    1999-01-01

    As the vertical flight industry moves into instrument flight rules (IFR) operations at heliports, it has become apparent to both FAA and the users that there is research and development to be done on heliport lighting...

  3. Technical data management at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Statler, J.; Newbury, C.M.; Heitland, G.W.

    1992-01-01

    The Department of Energy/Office of Civilian Radioactive waste Management (DOE/OCRWM) is responsible for the characterization of Yucca Mountain, Nevada, to determine its potential as a site of a high-level radioactive waste repository. The characterization of Yucca Mountain encompasses many diverse investigations, both onsite and in laboratories across the country. Investigations are being conducted of the geology, hydrology, mineralogy, paleoclimate, geotechnical properties, and archeology of the area, to name a few. Effective program management requires that data from site investigations be processed, interpreted and disseminated in a timely manner to support model development and validation, repository design, and performance assessment. The Program must also meet regulatory requirements for making the technical data accessible to a variety of external users throughout the life of the Project. Finally, the DOE/OCRWM must make available the data or its description and access location available for use in support of the license application and supporting documentation. To accomplish these objectives, scientific and engineering data, generated by site characterization activities, and technical data, generated by environmental and socioeconomic impact assessment activities, must be systematically identified, cataloged, stored and disseminated in a controlled manner

  4. Security and emergency management technical assistance for the top 50 transit agencies

    Science.gov (United States)

    2007-04-01

    Between May 2002 and July 2006, the Federal Transit Administration (FTA) provided technical assistance to the top 50 transit agencies through the Security and Emergency Management Technical Assistance Program (SEMTAP). The scope and purpose of the pr...

  5. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  6. 14 CFR 155.13 - Determinations by FAA.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Determinations by FAA. 155.13 Section 155... FAA. (a) An FAA office that receives a request for a release under this part, and supporting documents... case was referred to it, the FAA advises the airport owner as to whether the release or a modification...

  7. 32 CFR 728.58 - Federal Aviation Agency (FAA) beneficiaries.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Federal Aviation Agency (FAA) beneficiaries. 728... Federal Agencies § 728.58 Federal Aviation Agency (FAA) beneficiaries. (a) Beneficiaries. Air Traffic Control Specialists (ATCS) of the FAA when appropriate authorization has been furnished by the FAA...

  8. 14 CFR 47.19 - FAA Aircraft Registry.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false FAA Aircraft Registry. 47.19 Section 47.19... REGISTRATION General § 47.19 FAA Aircraft Registry. Each application, request, notification, or other communication sent to the FAA under this Part must be mailed to the FAA Aircraft Registry, Department of...

  9. 76 FR 6094 - FAA Public Forum To Conduct Regulatory Review

    Science.gov (United States)

    2011-02-03

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Parts 27 and 29 FAA Public Forum To Conduct Regulatory Review AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of public meeting. SUMMARY: The FAA announces an informal meeting to discuss the FAA rotorcraft rules, 14...

  10. U Plant Aggregate Area Management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document was prepared in support of an Aggregate Area Management Study of U Plant. It provides a technical baseline of the aggregate area and results from an environmental investigation that was undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC), which is currently the Waste Site and Facility Research Office, Natural Resources, Bechtel Hanford, Inc. (BHI). It is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. U Plant refers to the 221-U Process Canyon Building, a chemical separation facility constructed during World War II. It also includes the Uranium Oxide (UO 3 ) Plant constructed at the same time as 221-U as an adjunct to the original plutonium separation process but which, like 221-U, was converted for other missions. Waste sites are associated primarily with U Plant's 1952 through 1958 Uranium Metal Recovery Program mission and the U0 3 Plant's ongoing U0 3 mission. Waste sites include cribs, reverse wells, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, a waste vault, and the lines and encasements that connect them. It also includes the U Pond and its feed ditches and an underground tank farm designed for high-level liquid wastes

  11. Scientific and technical challenges of radioactive waste management

    International Nuclear Information System (INIS)

    Vira, J.

    1996-01-01

    In spite of considerable spending on research and technical development, the management of nuclear wastes continues to be a difficult issue in public decision making. The nuclear industry says that it has safe solutions for the ultimate disposal of nuclear wastes, but the message has not really got through to the public at large. Although communications problems reflect the general stigmatization of nuclear power, there are obvious issues in safety and performance assessment of nuclear waste disposal which evade scientific resolution. Any scientist is concerned for his personal credibility must respect the rules and limits of scientific practice, but the intriguing question is whether he would not do better to address the layman's worries about radioactive substances? The discussion in this paper points out the intricacies of the distinction between scientific proof and judgement, with emphasis on safety assessment for nuclear waste disposal. Who are the final arbitrators? In a democratic society it is probably those who vote.Building confidence in expert judgements is a challenge for waste managers and scientists. The media may create their own 'experts', whose only necessary credential is the trust of their audience, but scientific judgements must stand the test of time.'Confidence building' is currently a key word on the whole nuclear waste management scene, and confidence in science and scientists is certainly needed for any progress towards practical implementation of plans. The means for building confidence in the decision-making process are probably different from those applied for science and scientists. (author)

  12. Not flavone-8-acetic acid (FAA) but its murine metabolite 6-OH-FAA exhibits remarkable antivascular activities in vitro.

    Science.gov (United States)

    Pham, Minh Hien; Dauzonne, Daniel; Chabot, Guy G

    2016-06-01

    Flavone-8-acetic acid (FAA) has been proved to be a potent vascular-disrupting agent in mice. Unfortunately, FAA did not produce any anticancer activity in clinical trials. Previously, we had reported that FAA is metabolized by mouse microsomes into six metabolites, whereas it was poorly metabolized by human microsomes, with fewer metabolites formed in lesser amounts. Especially, 6-OH-FAA was not formed by human microsomes. In this work, two major available metabolites, 4'-OH-FAA and 6-OH-FAA, were tested and compared with the parent compound FAA for their potential antivascular activities in vitro. The ability of the products to induce morphological changes, disrupt preformed capillaries of EA.hy926 endothelial cells and inhibit tubulin polymerization in vitro was assessed. The action mechanism was determined using the RhoA and Rac1 inhibitors. At 25 µg/ml, 6-OH-FAA induced morphological changes and membrane blebbing, whereas 300 µg/ml of FAA and 4'-OH-FAA slightly changed the morphology without inducing membrane blebbing. At 300 µg/ml, 6-OH-FAA produced morphological changes that were 2.1-6.9-fold greater than that produced by FAA and 4'-OH-FAA, an effect that was consistent with its much greater inhibitory effect on tubulin polymerization compared with FAA and 4'-OH-FAA. 6-OH-FAA significantly disrupted the EA.hy926 cell capillaries. 6-OH-FAA activities were prevented in EA.hy926 cells pretreated with RhoA, but not Rac1, inhibitor. In this short communication we report for the first time that, in vitro, 6-OH-FAA, a mouse-specific FAA metabolite, exhibits significantly stronger antivascular activities compared with FAA and 4'-OH-FAA, which are mediated through the RhoA kinase pathway.

  13. 75 FR 66752 - Transmission Vegetation Management Practices; Supplemental Notice of Technical Conference

    Science.gov (United States)

    2010-10-29

    ... Vegetation Management Practices; Supplemental Notice of Technical Conference October 21, 2010. On October 5... Vegetation Management Practices would be held on Tuesday, October 26, from 1 p.m. to 5 p.m. This staff-led... . Kimberly D. Bose, Secretary. Technical Conference on Transmission Vegetation Management Practices Docket No...

  14. Management of technical and scientific competence and human resources

    International Nuclear Information System (INIS)

    Coupland, S.

    2007-01-01

    The Canadian nuclear industry has recently begun to expand and is facing challenges in developing and maintaining expertise in the nuclear sector. A report commissioned by the CANDU Owners Group confirmed that organizations that provide R and D support to the nuclear industry were operating at or near minimum capabilities. It revealed low entry rates into the nuclear industry and an ageing workforce. In response, industry adopted a three part strategy: (i) development of a strategic plan for maintaining the strength of R and D organizations, (ii) development of CANDU specific technical centres of excellence and (iii) development of strategies for the attraction, training and retention of new graduates. The University Network of Excellence in Nuclear Engineering (UNENE) was established as an alliance of Canadian universities, nuclear power utilities, and research and regulatory agencies for the support and development of nuclear education, as well as R and D capability in Canadian universities. The University of Ontario Institute of Technology (UOIT), Canada's newest university, includes the School of Energy Engineering and Nuclear Sciences (SEENS), which offers undergraduate degrees in nuclear engineering, radiation science and related areas. The Canadian nuclear industry and universities established the CANTEACH programme to develop a comprehensive set of education and training documents, with university participation. The Canadian Nuclear Association prepared three initiatives: (i) developing a strategic and long term view of the nuclear industry on which individual companies can anchor and build recruitment strategies; (ii) pursuing career and industry branding initiatives to attract young students; (iii) providing benchmarking initiatives to improve workforce planning, talent management, succession planning capabilities and knowledge management. Through these initiatives, the Canadian nuclear industry believes that it has a realistic and achievable plan to

  15. FAA Training. Continued Improvements Needed in FAA's Controller Field Training Program. Report to Congressional Requesters.

    Science.gov (United States)

    General Accounting Office, Washington, DC. Resources, Community, and Economic Development Div.

    Having examined the Federal Aviation Administration's (FAA) current program for providing field training to developmental and full-performance-level air traffic controllers, the General Accounting Office (GAO) recommends ensuring that FAA and contractor personnel are providing training consistently and uniformly. Further changes needed to ensure…

  16. Defense Virtual Library: Technical Metadata for the Long-Term Management of Digital Materials: Preliminary Guidelines

    National Research Council Canada - National Science Library

    Flynn, Marcy

    2002-01-01

    ... of the digital materials being preserved. This report, prepared by Silver Image Management (SIM), proposes technical metadata elements appropriate for digital objects in the Defense Virtual Library...

  17. Complex socio-technical systems: Characterization and management guidelines.

    Science.gov (United States)

    Righi, Angela Weber; Saurin, Tarcisio Abreu

    2015-09-01

    Although ergonomics has paid increasing attention to the perspective of complexity, methods for its operationalization are scarce. This study introduces a framework for the operationalization of the "attribute view" of complexity, which involves: (i) the delimitation of the socio-technical system (STS); (ii) the description of four complexity attributes, namely a large number of elements in dynamic interactions, a wide diversity of elements, unexpected variability, and resilience; (iii) the assessment of six management guidelines, namely design slack, give visibility to processes and outcomes, anticipate and monitor the impacts of small changes, monitor the gap between prescription and practice, encourage diversity of perspectives when making decisions, and create an environment that supports resilience; and (iv) the identification of leverage points for improving the STS design, based on both the analysis of relationships among the attributes and their classification as irreducible/manageable complexity, and liability/asset. The use of the framework is illustrated by the study of an emergency department of a University hospital. Data collection involved analysis of documents, observations of work at the front-line, interviews with employees, and the application of questionnaires. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  18. Status of Technical Requirements Development for Maintenance Effectiveness Management

    International Nuclear Information System (INIS)

    Ahn, Sang Kyu; Kim, Yun Il; Lee, Chang Ju; Chang, Gun Hyun

    2012-01-01

    It is well known that proper maintenance at nuclear power plant is essential to plant safety and that there is a clear link between effective maintenance and safety as it relates to such factors as the number of transients and challenges to safety systems and the associated need for operability, availability, and reliability of safety equipment. Good maintenance is also important in providing assurance that failures of non-safety related structures, systems, and components (SSCs) that could initiate, adversely affect, or mitigate a transient or an accident are also minimized. Maintenance is also important to ensure that design assumptions and margins in the original design basis are maintained and are not degraded to an unacceptable level. Therefore, good maintenance practice at nuclear power plants is of utmost importance in protecting public health and safety. This paper introduces the status of the development of regulatory technical requirements (Drafts) for utility's management of maintenance effectiveness. The process of Maintenance Effectiveness Management is shown in Figure 1

  19. 78 FR 43091 - Technical Operations Safety Action Program (T-SAP) and Air Traffic Safety Action Program (ATSAP)

    Science.gov (United States)

    2013-07-19

    ... Administration 14 CFR Part 193 [Docket No.: FAA-2013-0375] Technical Operations Safety Action Program (T-SAP) and... Disclosure. SUMMARY: The FAA is proposing that safety information provided to it under the T-SAP, established... to the FAA under the T-SAP and ATSAP, so the FAA can learn about and address aviation safety hazards...

  20. Unique strategies for technical information management at Johnson Space Center

    Science.gov (United States)

    Krishen, Vijay

    1994-01-01

    In addition to the current NASA manned programs, the maturation of Space Station and the introduction of the Space Exploration programs are anticipated to add substantially to the number and variety of data and documentation at NASA Johnson Space Center (JSC). This growth in the next decade has been estimated at five to ten fold compared to the current numbers. There will be an increased requirement for the tracking and currency of space program data and documents with National pressures to realize economic benefits from the research and technological developments of space programs. From a global perspective the demand for NASA's technical data and documentation is anticipated to increase at local, national, and international levels. The primary users will be government, industry, and academia. In our present national strategy, NASA's research and technology will assume a great role in the revitalization of the economy and gaining international competitiveness. Thus, greater demand will be placed on NASA's data and documentation resources. In this paper the strategies and procedures developed by DDMS, Inc., to accommodate the present and future information utilization needs are presented. The DDMS, Inc., strategies and procedures rely on understanding user requirements, library management issues, and technological applications for acquiring, searching, storing, and retrieving specific information accurately and quickly. The proposed approach responds to changing customer requirements and product deliveries. The unique features of the proposed strategy include: (1) To establish customer driven data and documentation management through an innovative and unique methods to identify needs and requirements. (2) To implement a structured process which responds to user needs, aimed at minimizing costs and maximizing services, resulting in increased productivity. (3) To provide a process of standardization of services and procedures. This standardization is the central

  1. Technical management techniques for identification and control of industrial safety and pollution hazards

    Science.gov (United States)

    Campbell, R.; Dyer, M. K.; Hoard, E. G.; Little, D. G.; Taylor, A. C.

    1972-01-01

    Constructive recommendations are suggested for pollution problems from offshore energy resources industries on outer continental shelf. Technical management techniques for pollution identification and control offer possible applications to space engineering and management.

  2. Basic concepts for crew resource management and non-technical skills.

    Science.gov (United States)

    Flin, Rhona; Maran, Nikki

    2015-03-01

    In this paper, we explain the conceptual background to non-technical skills and show how they can influence job performance in anaesthesia. We then describe the taxonomy of anaesthetists' non-technical skills (ANTS) and related systems, such as ANTS-AP for anaesthetic practitioners. We discuss the training courses that have been designed to teach these non-technical skills, which are called crew resource management (CRM), crisis resource management (CRM) or crisis avoidance resource management (CARMA). Finally, we discuss the application of non-technical skills assessment systems. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Managing knowledge in technical and scientific support organizations

    International Nuclear Information System (INIS)

    Beraha, D.; Goetz, K.; Puhr-Westerheide. P.

    2007-01-01

    Full text: In an introduction, the issues in knowledge management regarding licensing and supervision authorities as well as technical and scientific support organisations (TSO's) will be discussed. Although in general many of these issues are quite similar across organizations in the nuclear field, specific questions arise according to the knowledge management policies in regulation and supervision, as will be demonstrated by discussing the results of a recent workshop on human resource management in regulation and safety. With the need for managing knowledge in regulation and safety, a further field of supporting authorities has been opened to TSO's. As a prerequisite, a good knowledge on knowledge management methods and tools has to be acquired by a TSO, preferably by installing an own knowledge management system, thus gaining the indispensable practical experience. Driven by the ongoing demographic change, some TSO's have started early with the implementation of knowledge management practices in their own organizations. Three examples will be presented in the paper concerning knowledge management in safety and regulation, illustrating the efforts undertaken at GRS, the BMU (German Federal Ministry of Environment, Nature Preservation and Reactor Safety), and the TUV-SUD. At GRS, knowledge management started by specifying the goals of maintaining knowledge, particularly of retiring experts, and transferring this knowledge to the next generation. In addition, the knowledge management methods should become an integral part of every day's work, thus ensuring the sustainability of the effort. Initially, a basis for handling and distributing information and documents was provided by setting up a portal with integrated document management capabilities. In a next step, work was concentrated on the core business process, namely project work. This has been achieved by providing an own portal site for each project where all information pertinent to the project such as

  4. Technical and economic optimization study for HLW waste management

    International Nuclear Information System (INIS)

    Deffes, A.

    1989-01-01

    This study was conducted to assess the technical and economic aspects of high level waste (HLW) management with the objective of optimizing the interim storage duration and the dimensions of the underground repository site. The procedure consisted in optimizing the economic criterion under specified constraints. The results are intended to identify trends and guide the choice from among available options; simple and highly flexible models were therefore used in this study, and only nearfield thermal constraints were taken into consideration. Because of the present uncertainty on the physicochemical properties of the repository environment and on the unit cost figures, this study focused on developing a suitable method rather than on obtaining definitive results. With the physical and economic data bases used for the two media investigated (granite and salt) the optimum values found show that it is advisable to minimize the interim storage time, and that the geological repository should feature a high degree of spatial dilution. These results depend to a considerable extent on the assumption of high interim storage costs

  5. Technical and economic impacts of active management on distribution network

    International Nuclear Information System (INIS)

    Zhang, Jietan; Cheng, Haozhong; Wang, Chun

    2009-01-01

    With the deregulation of energy market and the appeal for environment protection, more and more distributed generation (DG) is embedded in the distribution network. However the approach of connecting DG in most cases is based on a so-called ''fit and forget'' policy and the capacity of DG is limited rigidly by distribution network operator (DNO) to avoid the negative effects of high level penetration. Therefore active management (AM) is put forward as an effective method to network reinforcement for the connection and operation of DG. In this paper, the concept and principle of AM are introduced, and several indices are proposed to evaluate both technical and economic impacts of AM on distribution network with DG. To simplify the simulation fuzzy C-means clustering (FCM) algorithm is introduced. The test results on a sample system represent that AM will lead to decrease of power generation of DG, but it can reduce energy losses and improve voltage profile effectively. Furthermore, AM will take great economic incentives to DG developer as well as DNO with reasonable policy. (author)

  6. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    Science.gov (United States)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  7. Application of owner technical management in hydraulic machinery and electrical equipment investment target control

    International Nuclear Information System (INIS)

    Luo, H

    2012-01-01

    Using technical means in investment target control is an effective method to improve investment benefit of a construction project. Take the practice of construction and management in hydropower station as an example, the investment and management need of the owner is put forward through the investment target decision-making process of electromechanical equipment. Owner technical management in the specific application measures and effects of investment target control was discussed in the paper, and the revelation in investment target control application of owner technical management was also summarized. The paper is aimed to provide a useful reference for the investment target control work in the construction of electromechanical equipment.

  8. Advisory Circular checklist and status of other FAA publications

    Science.gov (United States)

    1997-08-15

    This 1997 circular transmits the revised checklist of the Federal Aviation : Administration's (FAA) Advisory Circulars (AC's). It also lists certain other : FAA publications sold by the Superintendent of Documents.

  9. FAA computer security : recommendations to address continuing weaknesses

    Science.gov (United States)

    2000-12-01

    In September, testimony before the Committee on Science, House of Representatives, focused on the Federal Aviation Administration's (FAA) computer security program. In brief, we reported that FAA's agency-wide computer security program has serious, p...

  10. Some aspects of technical models within bridge management system

    Directory of Open Access Journals (Sweden)

    Grković Slobodan

    2015-01-01

    Full Text Available Bridge Management System (BMS represents a rational and systematic approach to organizing and conducting of all activities related to bridge maintenance. Main goal of BMS is helping the bridge owner to make an optimal decision with respect to bridge maintenance budget, whether it is dedicated to one bridge or to group of bridges, by securing that the decision is made on the basis of Life-Cycle Cost (LCC estimates. The structure of BMS is based on condition rating and Bridge Database (BD, Deterioration model (DM, Cost Model for evaluation of costs and Optimization Model for choosing the most rational maintenance strategy. Relationship between bridge condition rating and DM with maintenance costs within BMS is very important. Predictions regarding future intensity and rate of bridge deterioration depends on multitude of factors and it is a consequence of several simultaneous actions and deterioration processes (DP which need to be included into DMs. DMs are mostly based on modeling of physical and chemical actions and processes or they are based on statistical analysis of large number of data regarding the condition of existing bridges, or on artificial intelligence models, etc. Stochastic models based on Markov processes are applied within more advanced contemporary BMS. Due to social and economic circumstances and lack of financial resources over the last two decades in Republic of Serbia bridge maintenance was neglected and creation of BD was discontinued. The paper deliberates some aspects of technical models within BMS, with DMs being pointed out, development of BD within bridge maintenance in Republic of Serbia and it gives an overview of sophisticated BMS and current advances in this field.

  11. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  12. 14 CFR 14.28 - Review by FAA decisionmaker.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Review by FAA decisionmaker. 14.28 Section... § 14.28 Review by FAA decisionmaker. (a) In proceedings other than those under part 17 of this chapter and the AMS, either the applicant or the FAA counsel may seek review of the initial decision on the...

  13. 14 CFR 49.11 - FAA Aircraft Registry.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false FAA Aircraft Registry. 49.11 Section 49.11... AIRCRAFT TITLES AND SECURITY DOCUMENTS General § 49.11 FAA Aircraft Registry. To be eligible for recording, a conveyance must be mailed to the FAA Aircraft Registry, Department of Transportation, Post Office...

  14. The use of a checklist improves anaesthesiologists' technical and non-technical performance for simulated malignant hyperthermia management.

    Science.gov (United States)

    Hardy, Jean-Baptiste; Gouin, Antoine; Damm, Cédric; Compère, Vincent; Veber, Benoît; Dureuil, Bertrand

    2018-02-01

    Anaesthesiologists may occasionally manage life-threatening operating room (OR) emergencies. Managing OR emergencies implies real-time analysis of often complicated situations, prompt medical knowledge retrieval, coordinated teamwork and effective decision making in stressful settings. Checklists are recommended to improve performance and reduce the risk of medical errors. This study aimed to assess the usefulness of the French Society of Anaesthesia and Intensive Care's (SFAR) "Malignant Hyperthermia" (MH) checklist on a simulated episode of MH crisis and management thereof by registered anesthesiologists. Twenty-four anaesthesiologists were allocated to 2 groups (checklist and control). Their technical performance in adherence with the SFAR guidelines was assessed by a 30-point score and their non-technical performance was assessed by the Anaesthetists' Non-Technical Skills (ANTS) score. Every task completion was assessed independently. Data are shown as median (first-third quartiles). Anaesthesiologists in the checklist group had higher technical performance scores (24/30 (21.5-25) vs 18/30 (15.5-19.5), P=0.002) and ANTS scores (56.5/60 (47.5-58) vs 48.5/60 (41-50.5), P=0.024). They administered the complete initial dose of dantrolene (2mg/kg) more quickly (15.7 minutes [13.9-18.3] vs 22.4 minutes [18.6-25]) than the control group (P=0.017). However, anaesthesiologists deemed the usability of the checklist to be perfectible. Registered anaesthesiologists' use of the MH checklist during a simulation session widely improved their adherence to guidelines and non-technical skills. This study strongly suggests the benefit of checklist tools for emergency management. Notwithstanding, better awareness and training for anaesthesiologists could further improve the use of this tool. Copyright © 2017 Société française d'anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.

  15. Nuclear Stockpile Management: A Technical and Political Assessment

    International Nuclear Information System (INIS)

    Sitt, Bernard; Grand, Camille

    2009-10-01

    Managing the nuclear arsenals (whether strategic or non-strategic ones) belonging to States that possess nuclear weapons is quintessentially based on the objective of maintaining security, safety and the reliability of their weapons. Since the early stages of military nuclear armaments, it has hinged on an approach that has been altogether scientific, technical and industrial, where nuclear tests have played a key role in acquiring and checking knowledge, while advancing the research and development of new weapons. It has experienced important evolutions, particularly linked to the interruption of nuclear tests since the early 1990's, and to the gradual multilateral evolution towards the total banning of such tests, enforced thanks to moratorium agreements and later by the rounds of talks leading to the Comprehensive Test Ban Treaty (CTBT), its adoption and opening for signature in September 1996. The situation of de facto nuclear states is a different one, in that their strategic posture and the development of their arsenals are placed in specific regional contexts; yet, compared with the five nuclear weapons States according to the definition of the Non-Proliferation Treaty (NPT), their objectives in terms of reliability, safety and security are, of necessity, of the same nature, even though the technological capabilities placed at their disposal to meet their goals may vary considerably from one country to the next. One determining context is the ban on nuclear weapon tests. As decades went by, four successive treaties were signed: PTBT (1963), TTBT (1974), PNET (1976), CTBT (1996). Even though a complete, legally binding test ban still remains to be fully implemented, for more than ten years, there has existed a political norm of renunciation of testing, and a quasi-universal one too. Indeed the CTBT has had, and will continue to have, more remarkable results than the previous treaties, and it is bound to impose further serious constraints on the Stockpile

  16. Technical resource documents and technical handbooks for hazardous-wastes management

    Energy Technology Data Exchange (ETDEWEB)

    Schomaker, N.B.; Bliss, T.M.

    1986-07-01

    The Environmental Protection Agency is preparing a series of Technical Resource Documents (TRD's) and Technical Handbooks to provide best engineering control technology to meet the needs of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) respectively. These documents and handbooks are basically compilation of research efforts of the Land Pollution Control Division (LPCD) to date. The specific areas of research being conducted under the RCRA land disposal program relate to laboratory, pilot and field validation studies in cover systems, waste leaching and solidification, liner systems and disposal facility evaluation. The technical handbooks provide the EPA Program Offices and Regions, as well as the states and other interested parties, with the latest information relevant to remedial actions.

  17. NASA/FAA helicopter simulator workshop

    Science.gov (United States)

    Larsen, William E. (Editor); Randle, Robert J., Jr. (Editor); Bray, Richard S. (Editor); Zuk, John (Editor)

    1992-01-01

    A workshop was convened by the FAA and NASA for the purpose of providing a forum at which leading designers, manufacturers, and users of helicopter simulators could initiate and participate in a development process that would facilitate the formulation of qualification standards by the regulatory agency. Formal papers were presented, special topics were discussed in breakout sessions, and a draft FAA advisory circular defining specifications for helicopter simulators was presented and discussed. A working group of volunteers was formed to work with the National Simulator Program Office to develop a final version of the circular. The workshop attracted 90 individuals from a constituency of simulator manufacturers, training organizations, the military, civil regulators, research scientists, and five foreign countries.

  18. 75 FR 62809 - Transmission Vegetation Management Practices; Notice of Technical Conference

    Science.gov (United States)

    2010-10-13

    ... Vegetation Management Practices; Notice of Technical Conference October 5, 2010. Take notice that the Federal... the conference is to discuss current vegetation management programs and practices as required under... landowners and other affected parties have raised concerns about changes in vegetation management practices...

  19. ''RESURS'' - The Russian scientific-technical programme for NPP equipment lifetime monitoring, estimation, prediction and management

    International Nuclear Information System (INIS)

    Emelyanov, V.

    1994-01-01

    RESURS programme is described implementation of which will allow to work out regulatory-methodological basis providing legal and technical solution of NPP equipment lifetime management, prediction, monitoring and estimation problems

  20. Integrated corridor management initiative : demonstration phase evaluation - Dallas technical capability analysis test plan.

    Science.gov (United States)

    This report presents the test plan for conducting the Technical Capability Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ...

  1. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  2. An approach to knowledge structuring for advanced phases of the Technical and Management Information System (TMIS)

    Science.gov (United States)

    Goranson, H. T.

    1986-01-01

    The Technical and Management Information System (TMIS) must employ on enlightened approach to its object structure, but basic issues in conceptual structuring remain to be resolved. Sirius outlines the necessary agenda and reports on progress toward solutions.

  3. Technical Meeting on Grading of the Application of Management System Requirements. Presentations

    International Nuclear Information System (INIS)

    2012-01-01

    The objectives of this Technical Meeting are threefold: - to share international experiences and lessons learned, as well as exchange views on best practices and strategies to overcome the difficulties encountered; - to review and discuss the draft technical report on 'Grading the Application of Management System Requirements, to allow the participants to contribute to the improvement of the document and to enrich it with practical examples; and - to strengthen the international networking of specialists in the field. The topics covered during the meeting will include: - Examples and case studies presented by participants from countries with nuclear facilities (mainly focused on NPPs, and, where appropriate, from research reactors, fuel cycle and waste management facilities) on grading the application of management system requirements and lessons learned. - Reviewing and improving the final draft of a technical report on 'Grading the Application of Management System Requirements', which will supersede the previous guidance: Grading of Quality Assurance Requirement: A Manual (Technical Reports Series No. 328)

  4. Proceedings of the FAA-NASA Symposium on the Continued Airworthiness of Aircraft Structures. Volume 2

    Science.gov (United States)

    Bigelow, Catherine A. (Compiler)

    1997-01-01

    This publication contains the fifty-two technical papers presented at the FAA-NASA Symposium on the Continued Airworthiness of Aircraft Structures. The symposium, hosted by the FAA Center of Excellence for Computational Modeling of Aircraft Structures at Georgia Institute of Technology, was held to disseminate information on recent developments in advanced technologies to extend the life of high-time aircraft and design longer-life aircraft. Affiliations of the participants included 33% from government agencies and laboratories, 19% from academia, and 48% from industry; in all 240 people were in attendance. Technical papers were selected for presentation at the symposium, after a review of extended abstracts received by the Organizing Committee from a general call for papers.

  5. Proceedings of the FAA-NASA Symposium on the Continued Airworthiness of Aircraft Structures. Volume 1

    Science.gov (United States)

    Bigelow, Catherine A. (Compiler)

    1997-01-01

    This publication contains the fifty-two technical papers presented at the FAA-NASA Symposium on the Continued Airworthiness of Aircraft Structures. The symposium, hosted by the FAA Center of Excellence for Computational Modeling of Aircraft Structures at Georgia Institute of Technology, was held to disseminate information on recent developments in advanced technologies to extend the life of high-time aircraft and design longer-life aircraft. Affiliations of the participants included 33% from government agencies and laboratories, 19% from academia, and 48% from industry; in all 240 people were in attendance. Technical papers were selected for presentation at the symposium, after a review of extended abstracts received by the Organizing Committee from a general call for papers.

  6. FAA/NASA Joint University Program for Air Transportation Research 1994-1995

    Science.gov (United States)

    Remer, J. H.

    1998-01-01

    The Joint University Program for Air Transportation Research (JUP) is a coordinated set of three grants co-sponsored by the Federal Aviation Administration (FAA) and the National Aeronautics and Space Administration (NASA). Under JUP, three institutions: the Massachusetts Institute of Technology, Princeton, and Ohio Universities receive research grants and collaborate with FAA and NASA in defining and performing civil aeronautics research in a multitude of areas. Some of these disciplines are artificial intelligence, control theory, atmospheric hazards, navigation, avionics, human factors, flight dynamics, air traffic management, and electronic communications.

  7. 41 CFR 102-37.535 - What information must FAA provide to GSA on its administration of the public airport donation...

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What information must FAA provide to GSA on its administration of the public airport donation program? 102-37.535 Section... Donations to Public Airports § 102-37.535 What information must FAA provide to GSA on its administration of...

  8. 14 CFR 11.33 - How can I track FAA's rulemaking activities?

    Science.gov (United States)

    2010-01-01

    ... search the Federal Docket Management System (FDMS) for information on most rulemaking proceedings. You... rulemaking document proceeding. Each rulemaking document FAA issues in a particular rulemaking proceeding, as....regulations.gov. If you can't find the material in the electronic docket, contact the person listed under FOR...

  9. An analysis of the technical status of high level radioactive waste and spent fuel management systems

    Science.gov (United States)

    English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.

    1977-01-01

    The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

  10. Waste management assessment and technical review programme. WATRP. An international peer review service for radioactive waste management activities

    International Nuclear Information System (INIS)

    1994-09-01

    International Atomic Energy Agency provides international peer review services in radioactive waste management to those Member States that have established radioactive waste management programmes. Such services are provided within Waste Management Assessment and Technical Review Programme (WATRP). The main objective of WATRP is to provide international expertise and information on a requested subject in the field of radioactive waste management and to validate that programmes and activities are sound and performing well. Refs, figs and tabs

  11. Management of technical documents: a projection at the University of Zulia

    Directory of Open Access Journals (Sweden)

    Ana Judith Paredes Chacin

    2015-11-01

    Full Text Available Objective. This paper analyze comprehensively and systematically the principles of organization and technical procedure, which support document management based on the use of information technologies. Method. We developed a study based on the documentary descriptive method in the context of the Dirección de Infraestructura (Dinfra from the Universidad del Zulia. Results. We find evidence of efficiency in the processes that support the management of technical documents: Plans, metrics and memories generated by the Dinfra. Conclusion. The conceptual basis of organizational and technical archives contribute to the systematization, shelter save and documental preservation, and ensure the timely retrieval of technical information for the management of the University of Zulia.

  12. NASA-FAA-NOAA Partnering Strategy

    Science.gov (United States)

    Colantonio, Ron

    2003-01-01

    This viewgraph presentation provides an overview of NASA-FAA (Federal Aviation Administration) and NOAA (National Oceanic and Atmospheric Administration) collaboration efforts particularly in the area of aviation and aircraft safety. Five technology areas are being jointly by these agencies: (1) aviation weather information; (2) weather products; (3) automet technologies; (4) forward looking weather sensors and (5) turbulence controls and mitigation systems. Memorandum of Agreements (MOU) between these agencies are reviewed. A general review of the pros and pitfalls of inter-agency collaborations is also presented.

  13. NASA/FAA Tailplane Icing Program Overview

    Science.gov (United States)

    Ratvasky, Thomas P.; VanZante, Judith Foss; Riley, James T.

    1999-01-01

    The effects of tailplane icing were investigated in a four-year NASA/FAA Tailplane Icing, Program (TIP). This research program was developed to improve the understanding, of iced tailplane aeroperformance and aircraft aerodynamics, and to develop design and training aides to help reduce the number of incidents and accidents caused by tailplane icing. To do this, the TIP was constructed with elements that included icing, wind tunnel testing, dry-air aerodynamic wind tunnel testing, flight tests, and analytical code development. This paper provides an overview of the entire program demonstrating the interconnectivity of the program elements and reports on current accomplishments.

  14. Waste Management Program: Technical progress report, July-December 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 13 refs., 20 figs., 16 tabs

  15. Technical note: River modelling to infer flood management framework

    African Journals Online (AJOL)

    River hydraulic models have successfully identified the weaknesses and areas for improvement with respect to flooding in the Sarawak River system, and can also be used to support decisions on flood management measures. Often, the big question is 'how'. This paper demonstrates a theoretical flood management ...

  16. Waste Management Program: Technical progress report, January-June 1985

    International Nuclear Information System (INIS)

    1987-12-01

    This report provides information on operations and development programs relating to the management of radioactive wastes at the Savannah River Plant. Information on environmental and safety assessments, waste form development, and process and equipment development are reported for long-term waste management. 35 refs., 12 figs., 8 tabs

  17. Industrial management- control and profit a technical approach

    CERN Document Server

    Halevi, Gideon

    2014-01-01

    This volume presents controlling tools for management in order to be in a position to communicate with control engineers concerning technological decisions. The main objective of manufacturing management is to make profit. However, in traditional manufacturing systems none of the separate stages in the process support this objective. Management is not expert in any of these stages, and therefore is dependent on specific experts at each stage and must follow their decisions. Each stage has its own first priority which is not profit and cost. This means that management does not have real control over these functional stages, nor over the process as a whole. This book presents controlling tools for management in order to allow them to communicate better with the experts of the particular manufacturing stages to reach better results and higher profits. It is shown that most enterprises can improve their efficiency rate by between 25 and 60% by using the tools developed here.

  18. Refactoring for software design smells managing technical debt

    CERN Document Server

    Suryanarayana, Girish; Sharma, Tushar

    2014-01-01

    Awareness of design smells - indicators of common design problems - helps developers or software engineers understand mistakes made while designing, what design principles were overlooked or misapplied, and what principles need to be applied properly to address those smells through refactoring. Developers and software engineers may ""know"" principles and patterns, but are not aware of the ""smells"" that exist in their design because of wrong or mis-application of principles or patterns. These smells tend to contribute heavily to technical debt - further time owed to fix projects thought to b

  19. Electronic resource management practical perspectives in a new technical services model

    CERN Document Server

    Elguindi, Anne

    2012-01-01

    A significant shift is taking place in libraries, with the purchase of e-resources accounting for the bulk of materials spending. Electronic Resource Management makes the case that technical services workflows need to make a corresponding shift toward e-centric models and highlights the increasing variety of e-formats that are forcing new developments in the field.Six chapters cover key topics, including: technical services models, both past and emerging; staffing and workflow in electronic resource management; implementation and transformation of electronic resource management systems; the ro

  20. Technical Support Organization Knowledge Management for Nuclear Regulatory Support

    International Nuclear Information System (INIS)

    Kohut, P.; Ramsey, J.; Katsenelenbogen, S.

    2016-01-01

    Full text: Knowledge management awareness has increased through the nuclear industrial and regulatory community leading to better understanding of the handling of critical information. Utilizing, managing and regulating the application of nuclear power require an extensive system of expertise and associated research through established organizations. The long term maintenance of the specific expertise is only viable by using scientific knowledge management principles all through the national nuclear infrastructure involving regulatory, industrial, academic and other research institutions. National governments in countries operating or planning to establish nuclear facilities have instituted regulatory regimes on the use of nuclear materials and facilities to insure a high level of operational safety. (author

  1. Waste Management Program. Technical progress report, October-December 1982

    International Nuclear Information System (INIS)

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities

  2. Independent Electricity Market Operator integration management participant technical reference manual

    International Nuclear Information System (INIS)

    1999-01-01

    The document provides potential participants with the essential technical information to permit them to participate in the IMO-administered markets, and is not intended to be a complete technical reference manual for all issues within the realm of electricity production, distribution, or consumption. Written for the participants, it provides only that information which is relevant to the participant for interfacing with the IMO and participating in the market. Written as a generic guide, all the information contained within it may not be relevant to all the participants. The document's intent is to provide participants with a description of the various facilities and interfaces required by market participants to take part in the IMO-administered markets. The document supplements the market rules and provides installation, set-up, and configuration information for the various tools and facilities that will be required for market participation as a supplier, carrier/delivery (transmitter/distributor), generator, or consumer in the market. Aspects considered include: participant workstation specifications, dispatch workstation specification, message exchange, remote terminal unit specification, AGC operational RTU specification, real time network connection specification, telephone connection specification, revenue administration specification, funds administration specification, data catalogues, market information, power grid connection requirements, and appendices

  3. Environmental management system for transportation maintenance operations : [technical brief].

    Science.gov (United States)

    2014-04-01

    This report provides the framework for the environmental management system to analyze : greenhouse gas emissions from transportation maintenance operations. The system enables user : to compare different scenarios and make informed decisions to minim...

  4. CLOUD TECHNOLOGIES IN MANAGEMENT AND EDUCATIONAL PROCESS OF UKRAINIAN TECHNICAL UNIVERSITIES

    Directory of Open Access Journals (Sweden)

    Yu. Tryus

    2014-06-01

    Full Text Available This study analyzes opportunities for using cloud technologies in higher education in Ukraine. On the basis of principles of the system approach, it examines the main task of cloud technologies, strategic and tactical goals of cloud computing at the technical universities, as well as problems that arise in their implementation in the educational process. The paper discusses the main trends in the use of cloud technologies in higher technical education, analyzes cloud services used by leading technical universities in Ukraine in management and learning. The typical structure of a Technical University is considered with public, private, and hybrid clouds. The experience of Cherkasy State Technological University in the use of cloud technologies at management and learning is presented. Considerations are particularly given to distance support, mobile, and blending learning, virtualization mechanism to support the students learning at natural, mathematical sciences and engineering through the utilization of individual desktops.

  5. Technical documentation challenges in aviation maintenance : a proceedings report.

    Science.gov (United States)

    2012-11-01

    The 2012 Technical Documentation workshop addressed both problems and solutions associated with technical : documentation for maintenance. These issues are known to cause errors, rework, maintenance delays, other : safety hazards, and FAA administrat...

  6. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  7. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  8. Nuklearna Elektrarna Krsko: managing technical documentation for the 'rightsized' 90's and beyond

    International Nuclear Information System (INIS)

    Gradisar, D.; Freeland, K.R.

    1996-01-01

    Nuklearna Elektrarna Krsko (NEK) was constructed as a turnkey plant, entering commercial service in 1981. NEK operates the plant with a unique management philosophy which has adapted well to the demands of today's business environment. Contributing to this success has been the NEK Management Information System (MIS) that has assisted NEK in 'making more with less'. A key element of the MIS is the Technical Document system, which includes the DCM (Document Control Module) and QRM (Quality Records Management), enabling the successful retrofit of the existing document management and 'turnkey' plant records environment to a new, thoroughly integrated system controlling plant operation and configuration management. The system integrates the Engineering Equipment and Configuration Management data systems, providing immediate, realtime cross-reference of plant equipment and plant modifications with technical documentation. (author)

  9. A method for strategic technical life cycle management of real estates

    OpenAIRE

    Koskelo, Taina

    2005-01-01

    This research study focuses on the strategic technical life cycle management (TLCM) of real estate. In the early phases of the study it became clear that very often the performance of TLCM was not perceived as satisfactory: there were problems in the purchasing and provision of technical services, TLCM was not performed according to real estate specific needs and objective-setting for building characteristics did not serve cost-effective ownership. The study focuses on four research quest...

  10. Technical strategy for the management of INEEL spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report presents evaluations, findings, and recommendations of the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Task Team. The technical strategy developed by the Task Team includes stabilization, near term storage, packaging, transport, and ultimate disposal. Key issues identified and discussed include waste characterization, criticality, packaging, waste form performance, and special fuels. Current plans focus on onsite needs, and include three central elements: (1) resolution of near-term vulnerabilities, (2) consolidation of storage locations, and (3) achieving dry storage in transportable packages. In addition to the Task Team report, appendices contain information on the INEEL spent fuel inventory; regulatory decisions and agreements; and analyses of criticality, packaging, storage, transportation, and system performance of a geological repository. 16 refs., 6 figs., 4 tabs.

  11. PUREX Plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    The PUREX aggregate area is made up of six operable units; 200-PO-1 through 200-PO-6 and consists of liquid and solid waste disposal sites in the vicinity of, and related to, PUREX Plant operations. This report describes PUREX and its waste sites, including cribs, french drains, septic tanks and drain fields, trenches and ditches, ponds, catch tanks, settling tanks, diversion boxes, underground tank farms, and the lines and encasements that connect them. Each waste site in the aggregate area is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. This document provides a technical baseline of the aggregate area and results from an environmental investigation. This document is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted

  12. Technical Procedures Management in Gas-Phase Detoxification Laboratory

    International Nuclear Information System (INIS)

    Cardona Garcia, A. I.; Sanchez Cabrero, B.

    2000-01-01

    The natural cycle of Volatile Organic Compounds (VOCs) has been disturbed by the industrial and socioeconomic activities of human beings. This imbalance in the environment has affected the ecosystems and the human health. Initiatives have been planned to mitigate these adverse effects. In order to minimize the hazardous effects, initiatives have been proposed for the treatment of gaseous emissions. The solar photo catalysis appears as a clear and renewable technology in front of the conventional ones.In CIEMAT this line is being investigated as the base of a future implementation at a pre industrial scale.Technical procedures are written in this document for testing Gas-Phase detoxification at lab scale in the Renewable Energy Department (DER) CIEMAT- Madrid to eliminate the VOCs by using the solar photo catalysis technology. (Author) 34 refs

  13. Technical strategy for the management of INEEL spent nuclear fuel

    International Nuclear Information System (INIS)

    1997-03-01

    This report presents evaluations, findings, and recommendations of the Idaho National Engineering and Environmental Laboratory (INEEL) Spent Nuclear Fuel Task Team. The technical strategy developed by the Task Team includes stabilization, near term storage, packaging, transport, and ultimate disposal. Key issues identified and discussed include waste characterization, criticality, packaging, waste form performance, and special fuels. Current plans focus on onsite needs, and include three central elements: (1) resolution of near-term vulnerabilities, (2) consolidation of storage locations, and (3) achieving dry storage in transportable packages. In addition to the Task Team report, appendices contain information on the INEEL spent fuel inventory; regulatory decisions and agreements; and analyses of criticality, packaging, storage, transportation, and system performance of a geological repository. 16 refs., 6 figs., 4 tabs

  14. Waste Management Program. Technical progress report, July-December, 1984

    International Nuclear Information System (INIS)

    1986-10-01

    This report provides information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, other support, in situ storage or disposal, waste form development and characterization, process and equipment development, and the Defense Waste Processing Facility are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations: tank farm operation, inspection program, burial ground operations, and waste transfer/tank replacement

  15. Waste Management Program. Technical progress report, Aporil-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-02-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant. The studies on environmental and safety assessments, process and equipment development, TRU waste, and low-level waste are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  16. Technical management on commissioning test of nuclear heating reactor

    International Nuclear Information System (INIS)

    Zhang Yajun; Su Qingshan

    1999-01-01

    The commissioning is the last construction stage of a nuclear heating project. The commissioning quality will directly affect on the safe operation and availability of the heating reactor. The author presents the whole test process until the completion of the test report from the point of test documents, including the preparation and execution of the test, the management of the various unexpected events during the test. And it will be emphatically discussed that the managing procedures of the various unexpected events during the test, including temporary control change, setpoint change, unexpected events and design change

  17. Simulation-Based Laparoscopic Surgery Crisis Resource Management Training-Predicting Technical and Nontechnical Skills.

    Science.gov (United States)

    Goldenberg, Mitchell G; Fok, Kai H; Ordon, Michael; Pace, Kenneth T; Lee, Jason Y

    2017-12-19

    To develop a unique simulation-based assessment using a laparoscopic inferior vena cava (IVC) injury scenario that allows for the safe assessment of urology resident's technical and nontechnical skills, and investigate the effect of personality traits performance in a surgical crisis. Urology residents from our institution were recruited to participate in a simulation-based training laparoscopic nephrectomy exercise. Residents completed demographic and multidimensional personality questionnaires and were instructed to play the role of staff urologist. A vasovagal response to pneumoperitoneum and an IVC injury event were scripted into the scenario. Technical and nontechnical skills were assessed by expert laparoscopic surgeons using validated tools (task checklist, GOALS, and NOTSS). Ten junior and five senior urology residents participated. Five residents were unable to complete the exercise safely. Senior residents outperformed juniors on technical (checklist score 15.1 vs 9.9, p Technical performance scores correlated with NOTSS scores (p technical performance (p technical score (p = 0.03) and pass/fail rating (p = 0.04). Resident level of training and laparoscopic experience correlated with technical performance during a simulation-based laparoscopic IVC injury crisis management scenario, as well as multiple domains of nontechnical performance. Personality traits of our surgical residents are similar and did not predict technical skill. Copyright © 2017 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  18. Ohio Financial Services and Risk Management. Technical Competency Profile (TCP).

    Science.gov (United States)

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document describes the essential competencies from secondary through post-secondary associate degree programs for a career in financial services and risk management. Ohio College Tech Prep Program standards are described, and a key to profile codes is provided. Sample occupations in this career area, such as financial accountant, loan…

  19. Emergency Management Operations Process Mapping: Public Safety Technical Program Study

    Science.gov (United States)

    2011-02-01

    services Operational Activity Collect and Manage Cash Donations Once activated, refer cash donations to appropriate voluntary organizations...recovery operations. Operational Activity Conduct Euthanasia /Disposal Provide humane methods to euthanize affected animals to stop the spread of the...issue stop movement orders, and initiate animal vaccination and treatment programs, euthanasia efforts, or other protective measures designed to control

  20. National Project Management Corp (United States). [Technical and regulatory aspects

    International Nuclear Information System (INIS)

    DeBor, Joseph

    2013-01-01

    Studies of the VHTR fuel cycle which involves: (i) use of light water cooled reactor (LWR) spent fuel as kernel feedstock; (ii) recycle of spent VHTR fuel; (iii) use of the VHTR in the management of transuranics (TRU); and, (iv) the geologic storage performance of spent VHTR fuel

  1. Technical considerations and policy requirements for plutonium management

    International Nuclear Information System (INIS)

    Christensen, D.C.; Dinehart, S.M.; Yarbro, S.L.

    1995-01-01

    The goals for plutonium management have changed dramatically over the past few years. Today, the challenge is focused on isolating plutonium from the environment and preparing it for permanent disposition. In parallel, the requirements for managing plutonium are rapidly changing. For example, there is a significant increase in public awareness on how facilities operate, increased attention to environmental safety and health (ES and H) concerns, greater interest in minimizing waste, more emphasis on protecting material from theft, providing materials for international inspection, and a resurgence of interest in using plutonium as an energy source. Of highest concern, in the immediate future, is protecting plutonium from theft or diversion, while the national policy on disposition is debated. These expanded requirements are causing a broadening of responsibilities within the Department of Energy (DOE) to include at least seven organizations. An unavoidable consequence is the divergence in approach and short-term goals for managing similar materials within each organization. The technology base does exist, properly, safely, and cost effectively to extract plutonium from excess weapons, residues, waste, and contaminated equipment and facilities, and to properly stabilize it. Extracting the plutonium enables it to be easily inventoried, packaged, and managed to minimize the risk of theft and diversion. Discarding excess plutonium does not sufficiently reduce the risk of diversion, and as a result, long-term containment of plutonium from the environment may not be able to be proven to the satisfaction of the public

  2. Ohio Legal Office Managment. Technical Competency Profile (TCP).

    Science.gov (United States)

    Ray, Gayl M.; Wilson, Nick; Mangini, Rick

    This document, which lists core business and legal office management competencies identified by representatives from education and business and industry throughout Ohio, is intended to assist individuals and organizations in developing college tech prep programs that will prepare students from secondary through post-secondary associate degree…

  3. Water management paradigms in Iran: technical, social and ethical aspects

    NARCIS (Netherlands)

    Balali, M.R.; Keulartz, F.W.J.; Korthals, M.J.J.A.A.

    2007-01-01

    In Iran, water scarcity is one of the main problems threatening food security. The country is confronted with the challenge to continue the expansion of food production to meet future demand without negative effects on the environment. To illuminate the problems and perspectives of water management

  4. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  5. Technical Evaluation Report 29: Integrated Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Linda Schwartz

    2004-04-01

    Full Text Available Four integrated learning management packages were reviewed: CentraOne, IntraLearn, Lyceum, and Silicon Chalk. These products provide different combinations of synchronous and asynchronous tools. The current report examines the products in relation to their specific value for distance educators and students.

  6. Technical considerations and policy requirements for plutonium management

    International Nuclear Information System (INIS)

    Christensen, D.C.; Dinehart, S.M.; Yarbro, S.L.

    1996-01-01

    The goals for plutonium management have changed dramatically over the past few years. Today, the challenge is focused on isolating plutonium from the environment and preparing it for permanent disposition. In parallel, the requirements for managing plutonium are rapidly changing. For example, there is a significant increase in public awareness on how facilities operate, increased attention to environmental safety and health (ES and H) concerns, greater interest in minimizing waste, more emphasis on protecting material from theft, providing materials for international inspection, and a resurgence of interest in using plutonium as an energy source. Of highest concern, in the immediate future, is protecting plutonium from theft or diversion, while the national policy on disposition is debated. These expanded requirements are causing a broadening of responsibilities within the Department of Energy (DOE) to include at least seven organizations. An unavoidable consequence is the divergence in approach and short-term goals for managing similar materials within each organization. The technology base does exist, properly, safely, and cost effectively to extract plutonium from excess weapons, residues, waste, and contaminated equipment and facilities, and to properly stabilize it. Extracting the plutonium enables it to be easily inventoried, packaged, and managed to minimize the risk of theft and diversion. Discarding excess plutonium does not sufficient reduce the risk of diversion, and as a result, long-term containment of plutonium from the environment may not be able to be proven to the satisfaction of the public

  7. Knowledge-Centric Technical Support Organization (TSO) Using Process Oriented Knowledge Management Approach

    International Nuclear Information System (INIS)

    Mohamad Safuan Sulaiman; Siti Nurbahyah Hamdan; Mohd Dzul Aiman Aslan

    2014-01-01

    In the United States of America, Process Oriented Knowledge Management (POKM) Model has been successfully implemented in most of Nuclear Power Plants. This approach has been introduced in Nuclear Knowledge Management program by the IAEA since 2011. Malaysia has involved in the IAEA Coordinated Research Project (CRP) focusing the approach started in 2011. The main objective for Malaysian participation of this project is to support readiness in terms of nuclear technical knowledge by Technical Support Organization (TSO) for Nuclear Power Program. This project has focused on several nuclear technical areas which consist of Public Information (PI), Radiological Impact Assessment (RIA), Nuclear Reactor Technology (NRT), Plant and Prototype Development (PDC) and nuclear knowledge management. This paper articulates the detail POKM approach and project experience in implementing the approach at organizational level. (author)

  8. 13 CFR 124.704 - What additional management and technical assistance is reserved exclusively for concerns eligible...

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What additional management and.../SMALL DISADVANTAGED BUSINESS STATUS DETERMINATIONS 8(a) Business Development Management and Technical Assistance Program § 124.704 What additional management and technical assistance is reserved exclusively for...

  9. B Plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    The B aggregate area is made up of 13 operable units; 200-BP 1 through 200-BP 1 1, 200-IU-6, and 200-SS-1 that consist of liquid and solid waste disposal sites in the vicinity of, and related to, B Plant operations. This report describes B Plant and its waste sites, including cribs, french drains, septic tanks and drain fields, trenches and ditches, ponds, catch tanks, settling tanks, diversion boxes, underground tank farms designed for high-level liquid wastes, and the lines and encasements that connect them. Each waste site in the aggregate area is described separately. Close relationships between waste units, such as overflow from one to another, are also discussed. This document provides a technical baseline of the aggregate area and results from an environmental investigation. This document is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted

  10. An Instructional Systems Approach or FAA Student Centered Training.

    Science.gov (United States)

    Federal Aviation Administration (DOT), Washington, DC.

    The Federal Aviation Administration (FAA) Academy has been using a systems approach as part of its training program since 1969. This booklet describes the general characteristics of an instructional system and explains the steps the FAA goes through in implementing the approach. These steps are: 1) recognize a need for training, 2) specify the…

  11. 47 CFR 73.4102 - FAA communications, broadcast of.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false FAA communications, broadcast of. 73.4102 Section 73.4102 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.4102 FAA communications...

  12. Potential Cost Savings Ideas for FAA and Users

    Science.gov (United States)

    1997-06-04

    The intent of this paper is to catalogue potential cost-savings ideas which : impact both the FAA and the aviation community. These ideas have come from : various sources including MITRE, Coopers & Lybrand (C&L), FAA studies, General : Accounting Off...

  13. FAA statistical handbook of aviation, calendar year 1988

    Science.gov (United States)

    1988-08-15

    The FAA Statistical Handbook of Aviation is published annually by the Federal Aviation Administration (FAA). The handbook is provided here in MS Excel. format as downloadable files and as text tables that can be viewed in PDF format. The prime purpos...

  14. 14 CFR 11.25 - How does FAA issue rules?

    Science.gov (United States)

    2010-01-01

    ...) Whom to call if you have questions about the rulemaking document. (5) The date, time, and place of any... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false How does FAA issue rules? 11.25 Section 11... RULES GENERAL RULEMAKING PROCEDURES Rulemaking Procedures General § 11.25 How does FAA issue rules? (a...

  15. Nuclear graphite waste management. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    2001-05-01

    The purpose of the seminar was to bring together the specialists dealing with various aspects of radioactive graphite waste management to exchange and review information on the decommissioning, characterisation, processing and disposal of irradiated graphite from reactor cores and other graphite waste associated with reactor operation. The seminar covered radioactive graphite characterisation, the effect of irradiation on graphite components, Wigner energy, radioactive graphite waste treatment, conditioning, interim storage and long term disposal options. Individual papers presented at the seminar were indexed separately

  16. Technical and management considerations in conducting type B shipping container tests

    International Nuclear Information System (INIS)

    Whitney, M.A.; Leader, D.R.; Phipps, D.P.

    1994-01-01

    The Code of Federal Regulations (CFR) mandate that type B shipping containers are capable of surviving specific drop tests. One approach for demonstrating compliance to the CFRs is to drop test a shipping container. This paper will discuss the technical and management considerations in conducting such drop tests on the 9975 family of shipping containers. For both technical and management considerations this paper will comment on loading the shipping container, dropping the shopping container, and examination of the shipping container after the drop tests

  17. Technical meeting on progress in managing, and limiting the consequences of events exceeding the design basis

    International Nuclear Information System (INIS)

    Fabian, H.

    2004-01-01

    The Technical Groups on 'Reactor Safety' and 'Thermodynamics and Fluid Dynamics' of the Kerntechnische Gesellschaft e.V. organized a joint technical meeting on 'Progress in Managing, and Limiting the Consequences of, Events Exceeding the Design Basis' at the FTU Training Center of the Karlsruhe Research Center. The topic chosen, the papers presented, the presenters, and the non-technical part of the program met with lively interest on the part of institutions in the nuclear field. These were the objectives of the technical meeting: - Establishing a forum for communicating relevant topics. - In-depth discussion of the main topic, i.e. the advanced development of reactor safety, research in the field, and its application, in twenty selected papers presented by speakers from different institutions. - Presentation of topical work in a nuclear technology institution, the Karlsruhe Research Center. (orig.) [de

  18. Technical Potential for Peak Load Management Programs in New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, B.J.

    2002-12-13

    producers and consumers. Fortunately too, only a percentage of loads need to respond elastically for all customers to benefit. This report explores mechanisms to reduce, when necessary, the peak load in New Jersey's electricity market. It examines load pricing and technical load reduction programs used in recent years in New Jersey and discuss how they can be made more effective in controlling summer peaks and attendant high prices of electricity. Particular attention is given to load curtailment programs now in place and utility opinions relating to them.

  19. Experiences with a technically oriented plant management system; Erfahrungen mit einem technisch orientierten Betriebs-Management-System

    Energy Technology Data Exchange (ETDEWEB)

    Haffmann, E. [GiS Gesellschaft fuer integrierte Systemplanung mbH, Erlangen (Germany)

    2000-07-01

    This contribution first deals with the duality of mercantile and technical plant management systems. The following aspects are considered: reasons for and history of this duality; different approaches taken by mercantile and technical plant management systems; differences in the standardisability of mercantile and technical tasks. Dissolution of the duality through coordinated interplay. The author then goes on to explain the most important components of technically oriented maintenance management. These include the collection of technical plant data (with maintenance-relevant data and relations); the establishment of recurring tasks, the commissioning method (involving occupational safety, packaging and evaluation), compilation of manuals, reporting and accompanying plant documentation. The following tools are useful for DP-assisted maintenance: depiction of organisational and operational structures (authorisation system + IBFS application); workflow systems; modelling (data and object models); navigators; form and dialogue generators; integration of external software (project planning, CAD and Office); interface to mercantile systems. Some highlights of the C/S-IBFS were demonstrated in practice at the symposium. [German] Das Referat behandelt zunaechst die Dualitaet von kaufmaennischen und technischen Betriebs-Management-Systemen anhand folgender Aspekte: - Gruende und Historie dieser Dualitaet, - unterschiedliche Loesungsansaetze von kaufmaennischen und technischen Betriebs-Management-Systemen, - unterschiedliche Standardisierbarkeit von kaufmaennischen und technischen Aufgabenstellungen, - Aufloesung der Dualitaet durch koordniertes Zusammenwirken. Sodann werden wichtige Bausteine eines technisch orientierten Instandhaltungs-Managements erlaeutert. Dazu gehoeren die technische Anlagenerfassung (mit instandhaltungsrelevanten Daten und Relationen), die Einrichtung wiederkehrender Aufgaben, das Arbeitsauftragsverfahren (mit Arbeitssicherheit, Paketierung und

  20. Examining the Impact of Non-Technical Security Management Factors on Information Security Management in Health Informatics

    Science.gov (United States)

    Imam, Abbas H.

    2013-01-01

    Complexity of information security has become a major issue for organizations due to incessant threats to information assets. Healthcare organizations are particularly concerned with security owing to the inherent vulnerability of sensitive information assets in health informatics. While the non-technical security management elements have been at…

  1. [Role and integration of technical prevention figures in the management system].

    Science.gov (United States)

    Bartolucci, G B; Santantonio, P; Casciani, M; Dagazzini, I

    2010-01-01

    The multifarious issues of health and safety at work require multi-disciplinary skills, both in the risk assessment and in the subsequent definition and management of preventive measures, and this requires a renewed operational protocol that supports integration and co-operation between the technical prevention figures. Thus, between occupational physicians and technical advisers there should be a concrete and fruitful interaction, which should not be episodic or occasional, but a modus operandi systematic and constant. In this contribution is discussed as the technical prevention figures should be included in the Health and Safety Management System and should make a specific contribution in defining corporate policies on prevention. In particular it is outlined the role that the occupational physician may play in the development of prevention and health promotion activities within the strategies of corporate social responsibility.

  2. 78 FR 6400 - Results of FAA Nitrous Oxide BLEVE Characterization Testing

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Results of FAA Nitrous Oxide BLEVE Characterization Testing AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of public... FAA sponsored testing of nitrous oxide (N 2 O) characteristics. Nitrous oxide is an important oxidizer...

  3. MSFC Skylab Apollo Telescope Mount. [a technical history and management critique

    Science.gov (United States)

    Morse, A. R.

    1974-01-01

    A technical history and management critique of the Skylab Apollo Telescope Mount (ATM) from initial conception through the design, manufacturing, testing and prelaunch phases is presented. A mission performance summary provides a general overview of the ATM's achievements in relationship to its design goals. Recommendations and conclusions applicable to hardware design, test program philosophy and performance, and program management techniques for the ATM with potential application to future programs are also discussed.

  4. From technical quality assurance of radiotherapy to a comprehensive quality of service management system

    International Nuclear Information System (INIS)

    Kehoe, T.; Rugg, L.

    1999-01-01

    A hierarchy of dosimetry, planning and machine performance checks and evaluations of clinical outcomes have been widely used in radiotherapy for decades. Procedures, codes of practice and guidance are readily available on the technical aspects of radiotherapy treatments, maintenance of which is achieved by quality control checks within a quality assurance approach to radiotherapy. Recently a series of high profile, well-publicised treatment accidents resulting in damage to patients have focused the attention of both professionals and the public. There is now pressure to introduce formal quality management systems. Patients and their relatives/carers are having their expectations raised but their definition of a quality service differs from that generally considered by the oncology professionals. Most departmental managers and staff have wide experience of quality control checks. They understand the philosophy of quality assurance. However the idea of formal quality systems/quality management is alien to them. What is a professional/departmental manager to do? This paper addresses that question by discussing the underlying principles of quality management covering service provision as well as technical radiotherapy treatment delivery and by providing some guidance based on experience in the practical implementation of quality management through three stages of development: a QA programme incorporating checks on essential parts of the technical treatment delivery, a formal documented certified QA system focusing on technical treatment delivery, a comprehensive quality management system covering all parts of a service. One possible action plan is provided indicating progress through the three stages of development based on experience in one large Radiation Oncology Department. With planning, resources and commitment. a comprehensive quality of service management system is achievable in radiotherapy. (author.)

  5. DOE Handbook: Guide to good practices for training of technical staff and managers

    International Nuclear Information System (INIS)

    1997-01-01

    Training programs at DOE facilities should prepare personnel to safely and efficiently operate the facilities in accordance with DOE requirements. This guide contains information that can be used to develop or validate training programs for technical staff and managers at DOE nuclear facilities. Training programs based on the content of this guide should provide assurance that these personnel perform their jobs safely and competently

  6. Improving technical information use: what can be learnt from a manager's perspective?

    Science.gov (United States)

    Jacobson, C; Lisle, A; Carter, R W; Hockings, M T

    2013-07-01

    Conservation practice reportedly suffers from low use of technical information. Understanding of factors that affect the influence of technical information on management decision-making is limited. We sought to identify leverage points for improved technical information dissemination in the New South Wales Parks and Wildlife Service, Australia, given the significant recent investments in monitoring and evaluation that had been made. We did so by exploring the inter-relationships between factors affecting the influence of different information types on management decisions. Results indicate that managers have a high inclination toward adaptive behavior, given they operate in an information poor environment. The most influential types of information were those that enabled interaction between information provider and recipient (e.g., staff experience and expertise). An analysis of the concordance in individuals' responses for different information types showed that neither accessibility nor organizational expectation of use was aligned with influence on decision-making. Alignment of responses also varied by work area. Raising expectations of information use or increasing access to particular types of information is therefore unlikely to result in an increase in influence on management decision-making. Rather than focussing on matching accessibility and expected use of particular information types, our results indicate that technical information uptake is best supported through existing peer networks tailored to specific work areas.

  7. Technical Management in an Age of Openness: The Political, Public, and Environmental Forest Ranger

    Science.gov (United States)

    Anderson, Sarah E.; Hodges, Heather E.; Anderson, Terry L.

    2013-01-01

    Modern bureaucracy faces trade-offs between public and congressional input and agency expertise. The U.S. Forest Service offers an opportunity to quantitatively analyze whether an agency that is required to be more open to the public and congressional input will be forced to ignore its technical expertise in managing resources. This study uses…

  8. Main conclusions of a seminar on managing technical resources in a changing nuclear industry

    International Nuclear Information System (INIS)

    Storey, P.D.

    2000-01-01

    The author recapitulates the different points from I Mech E Conference (Managing Technical resources in a changing Nuclear Industry -London, 29 September 1999), as following: UK position, BNFL Magnox and AEAT, UK view from BEGL, view from WANO, UK view from UKAEA, USA view from PECO Energy, and view from OECD NEA

  9. Technical bases for OCRWM's [Office of Civilian Radioactive Waste Management] policy decisions on international safeguards

    International Nuclear Information System (INIS)

    Sprecher, W.M.

    1989-01-01

    The purpose of this paper is to discuss the technical factors that contributed to the formulation of the international safeguards policy enunciated in September 1988 by the U.S. Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM), which is the federal organization responsible for the implementation of the Nuclear Waste Policy Act of 1982, as amended

  10. Land and water management paradigms in Iran: technical, social and ethical aspects

    NARCIS (Netherlands)

    Balali, M.R.; Keulartz, F.W.J.; Korthals, M.J.J.A.A.

    2007-01-01

    With respect to land and water management in Iran, three paradigms can be distinguished. The pre-modern paradigm can be characterised by its key technical system (the `qanat¿ underground irrigation system), its main social institution (the `buneh¿ cooperative organisation of agricultural

  11. NextGen Technologies on the FAA's Standard Terminal Automation Replacement System

    Science.gov (United States)

    Witzberger, Kevin; Swenson, Harry; Martin, Lynne; Lin, Melody; Cheng, Jinn-Hwei

    2014-01-01

    This paper describes the integration, evaluation, and results from a high-fidelity human-in-the-loop (HITL) simulation of key NASA Air Traffic Management Technology Demonstration - 1 (ATD- 1) technologies implemented in an enhanced version of the FAA's Standard Terminal Automation Replacement System (STARS) platform. These ATD-1 technologies include: (1) a NASA enhanced version of the FAA's Time-Based Flow Management, (2) a NASA ground-based automation technology known as controller-managed spacing (CMS), and (3) a NASA advanced avionics airborne technology known as flight-deck interval management (FIM). These ATD-1 technologies have been extensively tested in large-scale HITL simulations using general-purpose workstations to study air transportation technologies. These general purpose workstations perform multiple functions and are collectively referred to as the Multi-Aircraft Control System (MACS). Researchers at NASA Ames Research Center and Raytheon collaborated to augment the STARS platform by including CMS and FIM advisory tools to validate the feasibility of integrating these automation enhancements into the current FAA automation infrastructure. NASA Ames acquired three STARS terminal controller workstations, and then integrated the ATD-1 technologies. HITL simulations were conducted to evaluate the ATD-1 technologies when using the STARS platform. These results were compared with the results obtained when the ATD-1 technologies were tested in the MACS environment. Results collected from the numerical data show acceptably minor differences, and, together with the subjective controller questionnaires showing a trend towards preferring STARS, validate the ATD-1/STARS integration.

  12. Farmers’ Technical Knowledge about Integrated Pest Management (IPM in Olive Production

    Directory of Open Access Journals (Sweden)

    Mohammad S. Allahyari

    2017-12-01

    Full Text Available While Integrated Pest Management (IPM is a sustainable approach of pest control, contributing to reduced use of pesticides and risks on human health and the environment, farmers have shown limited interest in practicing this method. The present study explored the levels of technical knowledge about integrated management of the olive fly (Bactrocera oleae among olive growers in Roudbar County of Iran and factors underpinning olive farmers’ technical knowledge of integrated management. Data were collected in a survey of olive farmers, on the basis of a structured questionnaire. Almost half of the farmers (48.4% had good to excellent levels of technical knowledge of integrated management, while almost a third of the farmers (35.4% had a moderate knowledge level. However, a noticeable portion of the farmers (15.9% had poor knowledge of integrated management. Moreover, most farmers showed average knowledge of the adverse effects of pesticides on human health. While most farmers showed good levels of social participation, cooperation with institutes, and participation in extension activities, they showed low levels of community involvement (involvement in a group of people that have and share common interests with each other. Olive imports and the lack of a common action for olive fly control were perceived as the main barriers of IPM adoption among most farmers. Regression analysis revealed that increased community involvement, large area under olive farming, participation in education activities, and high farming experience promoted farmers’ technical knowledge of integrated olive fly control. Strengthening growers’ technical knowledge of IPM through community involvement and extension services among inexperienced small-scale olive farmers is recommended for reducing possible unnecessary insecticide sprays in olive production.

  13. Digital avionics systems - Overview of FAA/NASA/industry-wide briefing

    Science.gov (United States)

    Larsen, William E.; Carro, Anthony

    1986-01-01

    The effects of incorporating digital technology into the design of aircraft on the airworthiness criteria and certification procedures for aircraft are investigated. FAA research programs aimed at providing data for the functional assessment of aircraft which use digital systems for avionics and flight control functions are discussed. The need to establish testing, assurance assessment, and configuration management technologies to insure the reliability of digital systems is discussed; consideration is given to design verification, system performance/robustness, and validation technology.

  14. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Science.gov (United States)

    2010-01-01

    ...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What is the purpose of the 7(j) management and technical assistance program? 124.701 Section 124.701 Business Credit and Assistance SMALL...

  15. An SNMP-based solution to enable remote ISO/IEEE 11073 technical management.

    Science.gov (United States)

    Lasierra, Nelia; Alesanco, Alvaro; García, José

    2012-07-01

    This paper presents the design and implementation of an architecture based on the integration of simple network management protocol version 3 (SNMPv3) and the standard ISO/IEEE 11073 (X73) to manage technical information in home-based telemonitoring scenarios. This architecture includes the development of an SNMPv3-proxyX73 agent which comprises a management information base (MIB) module adapted to X73. In the proposed scenario, medical devices (MDs) send information to a concentrator device [designated as compute engine (CE)] using the X73 standard. This information together with extra information collected in the CE is stored in the developed MIB. Finally, the information collected is available for remote access via SNMP connection. Moreover, alarms and events can be configured by an external manager in order to provide warnings of irregularities in the MDs' technical performance evaluation. This proposed SNMPv3 agent provides a solution to integrate and unify technical device management in home-based telemonitoring scenarios fully adapted to X73.

  16. Technical appraisal of the current situation in the field of radioactive waste management

    International Nuclear Information System (INIS)

    1985-01-01

    Industrial activities are regarded as safe even though a small risk always exists. The philosophy of radiation protection accepts this and recognises that some level of risk will also be associated with safe radioactive waste management. Therefore the objective of radioactive waste management is to look for a strategy which, taken as a whole, is considered safe and provides an acceptable balance of all the radiological, technical, social, political and economic considerations. The RWMC's appraisal underlines the need for such a balance while concentrating on radiological and technical factors, particularly on the long term safety aspects of radioactive waste management. The fundamental conclusion is that detailed short and long term safety assessments can now be made which give confidence that radiation protection objectives can be met with currently available technology for most waste types, and at a cost which is only a small fraction of the overall cost of nuclear-generated power

  17. Final priority; Technical Assistance on State Data Collection--IDEA Data Management Center. Final priority.

    Science.gov (United States)

    2014-08-05

    The Assistant Secretary for the Office of Special Education and Rehabilitative Services (OSERS) announces a priority under the Technical Assistance on State Data Collection program. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to fund a cooperative agreement to establish and operate an IDEA Data Management Center (Center) that will provide technical assistance (TA) to improve the capacity of States to meet the data collection requirements of the Individuals with Disabilities Education Act (IDEA).

  18. 11. annual report of the technical advisory committee on the nuclear fuel waste management program

    International Nuclear Information System (INIS)

    1990-10-01

    The Eleventh Annual Report of the Technical Advisory Committee (TAC) assesses the scientific and technical progress made within the Canadian Nuclear Fuel Waste Management Program (NFWMP) during the period July 1989 to June 1990. The Committee notes that the general concept of a multibarrier system involving geologic media and engineered systems is based on known technologies and current scientific knowledge, and has gained strong international scientific and engineering support as currently the most feasible and practical. TAC continues to endorse the full investigation of the concept of nuclear waste disposal deep in plutonic formations, such as those in the Canadian Shield

  19. Native American Technical Assistance and Training for Renewable Energy Resource Development and Electrical Generation Facilities Management

    Energy Technology Data Exchange (ETDEWEB)

    A. David Lester

    2008-10-17

    The Council of Energy Resource Tribes (CERT) will facilitate technical expertise and training of Native Americans in renewable energy resource development for electrical generation facilities, and distributed generation options contributing to feasibility studies, strategic planning and visioning. CERT will also provide information to Tribes on energy efficiency and energy management techniques.This project will provide facilitation and coordination of expertise from government agencies and private industries to interact with Native Americans in ways that will result in renewable energy resource development, energy efficiency program development, and electrical generation facilities management by Tribal entities. The intent of this cooperative agreement is to help build capacity within the Tribes to manage these important resources.

  20. Balancing the technical, administrative, and institutional forces in defense waste management

    International Nuclear Information System (INIS)

    Hindman, T.B.

    1988-01-01

    Defense radioactive waste results from the Department of Energy's (DOE) national defense and nuclear weapons production activities. In 1983, the President submitted to Congress the Defense Waste Management Plan (DWMP) for defense high-level and transuranic wastes. The Plan proposed a workable approach for the final disposition of these wastes. The Department is still following the path laid out in this Plan. The proper management of this waste requires that technical, administrative, and institutional forces which are often neither well understood nor well documented be properly balanced. This paper clarifies the role these three forces play in the Defense waste management programs and provides examples of their impacts on specific programs

  1. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 3:] Technical communications in aeronautics: Results of an exploratory study. An analysis of profit managers' and nonprofit managers' responses

    Science.gov (United States)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Five assumptions were established for the analysis. Profit and nonprofit managers in the aerospace community were found to have different technical communications practices for one of the five assumptions tested. It was, therefore, concluded that profit and nonprofit managers in the aerospace community do not have different technical communications practices.

  2. Factors associated with continuance commitment to FAA matrix teams.

    Science.gov (United States)

    1993-11-01

    Several organizations within the FAA employ matrix teams to achieve cross-functional coordination. Matrix team members typically represent different organizational functions required for project accomplishment (e.g., research and development, enginee...

  3. Aviation Safety: FAA Oversight of Repair Stations Needs Improvement

    Science.gov (United States)

    1997-10-24

    This report by the General Accounting Office examines the Federal Aviation : Administration's (FAA) oversight of the aviation repair station industry. : Specifically, this report addresses the following questions: (1) What is the : nature and scope o...

  4. Aviation Safety: FAA and DOD Response to Similar Safety Concerns

    National Research Council Canada - National Science Library

    2002-01-01

    .... The Federal Aviation Administration (FAA) and the military services often face common safety issues as they oversee the operation of similar aircraft or even dissimilar aircraft that use common parts and materials...

  5. Integrating Space Flight Resource Management Skills into Technical Lessons for International Space Station Flight Controller Training

    Science.gov (United States)

    Baldwin, Evelyn

    2008-01-01

    The Johnson Space Center s (JSC) International Space Station (ISS) Space Flight Resource Management (SFRM) training program is designed to teach the team skills required to be an effective flight controller. It was adapted from the SFRM training given to Shuttle flight controllers to fit the needs of a "24 hours a day/365 days a year" flight controller. More recently, the length reduction of technical training flows for ISS flight controllers impacted the number of opportunities for fully integrated team scenario based training, where most SFRM training occurred. Thus, the ISS SFRM training program is evolving yet again, using a new approach of teaching and evaluating SFRM alongside of technical materials. Because there are very few models in other industries that have successfully tied team and technical skills together, challenges are arising. Despite this, the Mission Operations Directorate of NASA s JSC is committed to implementing this integrated training approach because of the anticipated benefits.

  6. The Role of Formal Education, Technical and Management Training on Information Systems (IS) Managers' Managerial Effectiveness as Perceived by Their Subordinates

    Science.gov (United States)

    Ligon, Jerry; Abdullah, ABM; Talukder, Majharul

    2007-01-01

    This study examined the relationship between Information Systems (IS) managers' formal education, level of technical and managerial training and their managerial effectiveness as perceived by their subordinates. The study finds that there is a strong positive relationship between the amount of technical training IS managers have received and their…

  7. The Environmental Trilogy project: Balancing technical, institutional, and cultural perspectives to environmental management

    International Nuclear Information System (INIS)

    Kurstedt, Pamela S.; Jim, Russell; Wadsworth, Bonnie C.W.; Burke, William H.; Kurstedt, Harold A. Jr.

    1992-01-01

    'The significant problems we face cannot be solved at the same level of thinking we were at when we created them.' Albert Einstein. I've identified an initial set of three perspectives important to building an integrated, comprehensive approach to managing the environment - technical, institutional, and cultural. I've constructed an holistic model (called the Environmental Trilogy) for environmental management, encompassing at least these three perspectives and their interrelationships. In this paper, I outline the model and report the results of a working session facilitated at Virginia Tech in Blacksburg, Virginia, in October 1991, involving three representatives from each of the technical, institutional, and cultural perspectives. The institutional members of this group were people who understand institutional effects, rather than those who represent institutions. The working group discussed and analyzed the technical-institutional, technical-cultural, and institutional-cultural inter- relationships of the environmental trilogy. The goals of the working group were to put structure on the environmental trilogy model, to facilitate the definition of variables, and explore relationships between and among variables. The working group members are to continue studying issues and components, perspectives, connections, and cause-and-effect in the models and report back to interested parties. The outcome is projected to be a more holistic, integrated view of the environment. (author)

  8. Realizing Sustainability in Facilities Management: a pilot study at the Technical University of Denmark

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Møller, Jacob Steen; Jäschke, Stefan

    2012-01-01

    , qualitative research and the preliminary analysis of a single, pilot case study of The Technical University of Denmark. Progress with the other complementary cases will be included in the presentation. The cases should be supplemented by more research on sustainable facilities management. Originality......, stakeholder interviews, focus groups, usability evaluations and practice-research workshops. The Technical University of Denmark (DTU) is the pilot case of an international collaboration, and more studies are planned to follow. Findings: The paper presents a framework for qualitative research on Sustainable...... Facilities Management (SFM), which can guide future research on Sustainability in FM and increase comparability between case studies. The research identifies the challenges and opportunities for integrating ecological, social and economical sustainability in university FM. The paper presents the analysis...

  9. Places available - Technical management courses (up to the end of 2015)

    CERN Multimedia

    2015-01-01

    Please find below the courses in the field of technical management scheduled up to the end of 2015 and which have places available.       For more details about a course and to register, please go to the Training Catalogue. If you need a course that is not in the catalogue, please contact your supervisor, your Departmental Training Officer or the HR-LD group at Communication.Training@cern.ch.

  10. Places available - Technical management courses (up to the end of July)

    CERN Multimedia

    2015-01-01

    Please find below the courses in the field of technical management scheduled up to the end of July and which have places available.       For more details about a course and to register, please go to the Training Catalogue. If you need a course that is not in the catalogue, please contact your supervisor, your Departmental Training Officer or the HR-LD group at Communication.Training@cern.ch.

  11. Places available - Technical management courses (up to the end of 2015)

    CERN Multimedia

    2015-01-01

    Please find below the courses in the field of technical management scheduled up to the end of 2015 and which have places available.     For more details about a course and to register, please go to the Training Catalogue. If you need a course that is not in the catalogue, please contact your supervisor, your Departmental Training Officer or the HR-LD group at Communication.Training@cern.ch.

  12. Places available - Technical management courses (up to the end of June 2016)

    CERN Multimedia

    2015-01-01

    Please find below the courses in the field of technical management scheduled up to the end of June 2016 and which have places available.     For more details about a course and to register, please go to the Training Catalogue. If you need a course that is not in the catalogue, please contact your supervisor, your Departmental Training Officer or the HR-LD group at Communication.Training@cern.ch.

  13. Development of technical information basis of aging management for nuclear power plants

    International Nuclear Information System (INIS)

    Kanno, M.

    2007-01-01

    In order to implement effective safety regulations on aging management for reactor facilities etc., the information on important technology issues, the latest technical knowledge including evaluation technology, test and research outcomes, related codes and standards, regulation information, operation experiences such as accidents and trouble, etc. with respect to aging-induced deterioration in and outside Japan and in other industries, were collected, organized and evaluated. (author)

  14. Technical Data Management Center: a focal point for meteorological and other environmental transport computing technology

    International Nuclear Information System (INIS)

    McGill, B.; Maskewitz, B.F.; Trubey, D.K.

    1981-01-01

    The Technical Data Management Center, collecting, packaging, analyzing, and distributing information, computer technology and data which includes meteorological and other environmental transport work is located at the Oak Ridge National Laboratory, within the Engineering Physics Division. Major activities include maintaining a collection of computing technology and associated literature citations to provide capabilities for meteorological and environmental work. Details of the activities on behalf of TDMC's sponsoring agency, the US Nuclear Regulatory Commission, are described

  15. 14 CFR 11.35 - Does FAA include sensitive security information and proprietary information in the Federal Docket...

    Science.gov (United States)

    2010-01-01

    ... RULEMAKING PROCEDURES Rulemaking Procedures General § 11.35 Does FAA include sensitive security information and proprietary information in the Federal Docket Management System (FDMS)? (a) Sensitive security information. You should not submit sensitive security information to the rulemaking docket, unless you are...

  16. 14 CFR 11.85 - Does FAA invite public comment on petitions for exemption?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Does FAA invite public comment on petitions... Rulemaking and for Exemption § 11.85 Does FAA invite public comment on petitions for exemption? Yes, FAA... the reasons for requesting it; and (e) A request for comments to assist FAA in evaluating the petition. ...

  17. Avoidable Technical and Clinical Denial Write-Off Management in Hospitals, Physician Offices, and Clinics.

    Science.gov (United States)

    Terra, Sandra Marlene; Byrne, Amanda

    2016-01-01

    This article reviews the various types of technical and clinical denials that are usually "written off" and proposes strategies to prevent this loss. For purposes of this writing, avoidable technical and clinical denial write-offs are defined as revenue lost from "first-pass" denials rejections. For example, a procedure that requires an authorization is performed without having had an authorization obtained. After appeals and attempts to recoup the revenue, often unsuccessful, the organization ultimately "writes off" the revenue as not collectable. The question to ask is: Are these claims really not collectable or can actionable steps be taken to conserve these dollars and improve the bottom line? Acute care hospitals, physician offices, and clinics. In today's environment, the need to manage costs is ubiquitous. Cost management is on the priority list of all savvy health care executives, even if margins are healthy, revenue is under pressure, and the magnitude of cost reduction needed is greater than what past efforts have achieved. As hospitals and physician clinics prioritize areas for improvement, reduction in lost revenue-especially avoidable lost revenue-should be at the top of the list. Attentively managing claim denial write-offs will significantly reduce lost revenue. There is significant interface between case management and the revenue cycle. Developing core competencies for reducing clinical and technical denials should be a critical imperative in overall cost management strategy. Case managers are well placed to prevent these unnecessary losses through accurate status determination and clinical documentation review. These clinical professionals can also provide insight into work flow and other processes inherent in the preauthorization process.

  18. Technical knowledge and water resources management: A comparative study of river basin councils, Brazil

    Science.gov (United States)

    Lemos, Maria Carmen; Bell, Andrew R.; Engle, Nathan L.; Formiga-Johnsson, Rosa Maria; Nelson, Donald R.

    2010-06-01

    Better understanding of the factors that shape the use of technical knowledge in water management is important both to increase its relevance to decision-making and sustainable governance and to inform knowledge producers where needs lie. This is particularly critical in the context of the many stressors threatening water resources around the world. Recent scholarship focusing on innovative water management institutions emphasizes knowledge use as critical to water systems' adaptive capacity to respond to these stressors. For the past 15 years, water resources management in Brazil has undergone an encompassing reform that has created a set of participatory councils at the river basin level. Using data from a survey of 626 members of these councils across 18 river basins, this article examines the use of technical knowledge (e.g., climate and weather forecasts, reservoir streamflow models, environmental impact assessments, among others) within these councils. It finds that use of knowledge positively aligns with access, a more diverse and broader discussion agenda, and a higher sense of effectiveness. Yet, use of technical knowledge is also associated with skewed levels of power within the councils.

  19. Management of technical knowledge in strengthening the global nuclear safety regime

    International Nuclear Information System (INIS)

    Kang, C.-S.

    2006-01-01

    The management of technical knowledge is becoming one of the key issues and challenges in strengthening global nuclear safety. The success of the industry depends on how to optimize knowledge acquisition, transfer and deployment. In this presentation, joint conduct of large-scale R and D work, assurance of free flow of safety-related knowledge from developed to developing nations, and potential imposition of a trade agreement between nuclear exporting and importing nations are discussed. The introduction of a 'Global Nuclear Safety Treaty' could be an excellent mechanism for achieving effective knowledge management and eventually enforcing a global safety regime. (author)

  20. Commercial vehicle fleet management and information systems. Technical memorandum 3 : ITS fleet management technology resource guide

    Science.gov (United States)

    1997-05-01

    In todays increasingly competitive economic environment, effective management of commercial vehicle fleets is important for all types of carriers and for the trucking industry as a whole. To meet fleet management needs, carriers increasingly are t...

  1. Aircraft/Air Traffic Management Functional Analysis Model: Technical Description. 2.0

    Science.gov (United States)

    Etheridge, Melvin; Plugge, Joana; Retina, Nusrat

    1998-01-01

    The Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 (FAM 2.0), is a discrete event simulation model designed to support analysis of alternative concepts in air traffic management and control. FAM 2.0 was developed by the Logistics Management Institute (LMI) under a National Aeronautics and Space Administration (NASA) contract. This document provides a technical description of FAM 2.0 and its computer files to enable the modeler and programmer to make enhancements or modifications to the model. Those interested in a guide for using the model in analysis should consult the companion document, Aircraft/Air Traffic Management Functional Analysis Model, Version 2.0 Users Manual.

  2. HANFORD SITE SOLID WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT TECHNICAL INFORMATION DOCUMENT [SEC 1 THRU 4

    International Nuclear Information System (INIS)

    FRITZ, L.L.

    2004-01-01

    This Technical Information Document (TID) provides engineering data to support DOE/EIS-0286, ''Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement''. Assumptions and waste volumes used to calculate engineering data are also provided in this document. This chapter provides a brief description of: the Solid Waste Management Program (including a description of waste types and known characteristics of waste covered under the program), the Hanford Site (including a general discussion of the operating areas), and the alternatives analyzed. The Hanford Site Solid Waste Management Program and DOE/EIS-0286 address solid radioactive waste types generated by various activities from both onsite and offsite generators. The Environmental Restoration (ER) waste management activities are not within the scope of DOE/EIS-0286 or this TID. Activities for processing and disposal of immobilized low-activity waste (ILAW) are not within the scope of the Solid Waste Management Program and this TID

  3. Adaptive management: The U.S. Department of the Interior technical guide

    Science.gov (United States)

    Williams, B K; Szaro, Robert C.; Shapiro, Carl D.

    2009-01-01

    The purpose of this technical guide is to present an operational definition of adaptive management, identify the conditions in which adaptive management should be considered, and describe the process of using adaptive management for managing natural resources. The guide is not an exhaustive discussion of adaptive management, nor does it include detailed specifications for individual projects. However, it should aid U.S. Department of the Interior (DOI) managers and practitioners in determining when and how to apply adaptive management. Adaptive management is framed within the context of structured decision making, with an emphasis on uncertainty about resource responses to management actions and the value of reducing that uncertainty to improve management. Though learning plays a key role in adaptive management, it is seen here as a means to an end, namely good management, and not an end in itself. The operational definition used in the guide is adopted from the National Research Council, which characterizes adaptive management as an iterative learning process producing improved understanding and improved management over time: Adaptive management [is a decision process that] promotes flexible decision making that can be adjusted in the face of uncertainties as outcomes from management actions and other events become better understood. Careful monitoring of these outcomes both advances scientific understanding and helps adjust policies or operations as part of an iterative learning process. Adaptive management also recognizes the importance of natural variability in contributing to ecological resilience and productivity. It is not a ‘trial and error’ process, but rather emphasizes learning while doing. Adaptive management does not represent an end in itself, but rather a means to more effective decisions and enhanced benefits. Its true measure is in how well it helps meet environmental, social, and economic goals, increases scientific knowledge, and reduces

  4. Validity evidence of non-technical skills assessment instruments in simulated anaesthesia crisis management.

    Science.gov (United States)

    Jirativanont, T; Raksamani, K; Aroonpruksakul, N; Apidechakul, P; Suraseranivongse, S

    2017-07-01

    We sought to evaluate the validity of two non-technical skills evaluation instruments, the Anaesthetists' Non-Technical Skills (ANTS) behavioural marker system and the Ottawa Global Rating Scale (GRS), to apply them to anaesthesia training. The content validity, response process, internal structure, relations with other variables and consequences were described for validity evidence. Simulated crisis management sessions were initiated during which two trained raters evaluated the performance of postgraduate first-, second- and third-year (PGY-1, PGY-2 and PGY-3) anaesthesia residents. The study included 70 participants, composed of 24 PGY-1, 24 PGY-2 and 22 PGY-3 residents. Both instruments differentiated the non-technical skills of PGY-1 from PGY-3 residents ( P skills were 0.86, 0.83, 0.84, 0.87, 0.80 and 0.86, respectively. The Cronbach's alpha for internal consistency of the ANTS instrument was 0.93, and was 0.96 for the Ottawa GRS. There was a high correlation between the ANTS and Ottawa GRS. The raters reported the ease of use of the Ottawa GRS compared to the ANTS. We found sufficient evidence of validity in the ANTS instrument and the Ottawa GRS for the evaluation of non-technical skills in a simulated anaesthesia setting, but the Ottawa GRS was more practical and had higher reliability.

  5. Technical approach for the management of UMTRA ground water investigation-derived wastes

    International Nuclear Information System (INIS)

    1994-02-01

    During characterization, remediation, or monitoring activities of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project, ground water samples are collected to assess the extent and amount of waterborne contamination that might have come from the mill tailings. This sampling sometimes occurs in contaminated areas where ground water quality has been degraded. Ground water sampling activities may result in field-generated wastes that must be disposed of in a manner protective of human health and the environment. During ground water sampling, appropriate measures must be taken to dispose of presampling purge water and well development water that is pumped to flush out any newly constructed wells. Additionally, pumping tests may produce thousands of gallons of potentially contaminated ground water that must be properly managed. In addition to the liquid wastes, there is the potential for bringing contaminated soils to the ground surface during the drilling and installation of water wells in areas where the subsurface soils may be contaminated. These soils must be properly managed as well. This paper addresses the general technical approach that the UMTRA Project will follow in managing field-generated wastes from well drilling, development, sampling, and testing. It will provide guidance for the preparation of Technical Assistance Contractor (TAC) Standard Operating Procedures (SOP) for the management and disposal of field-generated wastes from ground water monitoring and remediation activities

  6. Technical report—Diagnosis and management of an initial UTI in febrile infants and young children.

    Science.gov (United States)

    Finnell, S Maria E; Carroll, Aaron E; Downs, Stephen M

    2011-09-01

    The diagnosis and management of urinary tract infections (UTIs) in young children are clinically challenging. This report was developed to inform the revised, evidence-based, clinical guideline regarding the diagnosis and management of initial UTIs in febrile infants and young children, 2 to 24 months of age, from the American Academy of Pediatrics Subcommittee on Urinary Tract Infection. The conceptual model presented in the 1999 technical report was updated after a comprehensive review of published literature. Studies with potentially new information or with evidence that reinforced the 1999 technical report were retained. Meta-analyses on the effectiveness of antimicrobial prophylaxis to prevent recurrent UTI were performed. Review of recent literature revealed new evidence in the following areas. Certain clinical findings and new urinalysis methods can help clinicians identify febrile children at very low risk of UTI. Oral antimicrobial therapy is as effective as parenteral therapy in treating UTI. Data from published, randomized controlled trials do not support antimicrobial prophylaxis to prevent febrile UTI when vesicoureteral reflux is found through voiding cystourethrography. Ultrasonography of the urinary tract after the first UTI has poor sensitivity. Early antimicrobial treatment may decrease the risk of renal damage from UTI. Recent literature agrees with most of the evidence presented in the 1999 technical report, but meta-analyses of data from recent, randomized controlled trials do not support antimicrobial prophylaxis to prevent febrile UTI. This finding argues against voiding cystourethrography after the first UTI.

  7. 48 CFR 801.602-80 - Legal and technical review-Office of Construction and Facilities Management and National Cemetery...

    Science.gov (United States)

    2010-10-01

    ...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...

  8. PROBLEM-SOLVING METHODS OF PROJECT MANAGEMENT OF TECHNICAL DEVELOPMENT FOR AGRICULTURAL PRODUCERS

    Directory of Open Access Journals (Sweden)

    Александр Васильевич СИДОРЧУК

    2015-05-01

    Full Text Available There have been proposed projects of technical development for agricultural producers. The conclusions about system features research projects that underlie the problem-solving methods of project management, have been made. There have been proved these projects (systems that can be simulated with the help of the research and formalization of many events. These events are components of the seven main factors of the agricultural production. The conclusion about the using the research method of the probabilistic nature events in the field of the crops projects with the help of the statistical and imitational models, have been developed. There have been considered the relation between the forecasting of functional marks of the technological systems and the estimation of their cost. And there have been found the optimum correspondence between parameters of the technical supply and planned features of the crops projects.

  9. The development of technical database of advanced spent fuel management process

    Energy Technology Data Exchange (ETDEWEB)

    Ro, Seung Gy; Byeon, Kee Hoh; Song, Dae Yong; Park, Seong Won; Shin, Young Jun

    1999-03-01

    The purpose of this study is to develop the technical database system to provide useful information to researchers who study on the back end nuclear fuel cycle. Technical database of advanced spent fuel management process was developed for a prototype system in 1997. In 1998, this database system is improved into multi-user systems and appended special database which is composed of thermochemical formation data and reaction data. In this report, the detailed specification of our system design is described and the operating methods are illustrated as a user's manual. Also, expanding current system, or interfacing between this system and other system, this report is very useful as a reference. (Author). 10 refs., 18 tabs., 46 fig.

  10. Evaluation of decision making in technical support center for effective severe accident management

    International Nuclear Information System (INIS)

    Huh, C.; Suh, N.

    2010-01-01

    We have evaluated the technical and organizational aspect of the current SAMG focusing on the decision making process in TSC. Technically, we found that the current SAMG is a good software kind of tool which can help operators to manage the severe accident. But the clear cutting of EOP and SAMG, shift of plant control from MCR to TSC seems to have no firm ground to be accepted as it is. Study on the organizational behavior shows that the group decision under risky situation will be inevitably polarized either toward risky or cautious way. Since the current SAMG makes TSC to evaluate the pros and cons of strategies to be implemented and choose one based on group decision, we are not free of this group polarization phenomenon. We propose that the proven organization of EOP needs to be maintained and also that the SAMG needs to be more proceduralized. (authors)

  11. The influence of system interactivity and technical support on learning management system utilization

    Directory of Open Access Journals (Sweden)

    Sousan Baleghi-Zadeh

    2017-03-01

    Full Text Available In recent years, there has been a growing increase in using Learning Management System (LMS by universities. However, its utilization by students is limited in Malaysia. The main purpose of the present study is to develop and test a model that predicts LMS utilization by Malaysian higher education students. Based on the Technology Acceptance Model, the study investigated the relationships among six constructs (system interactivity, technical support, perceived ease of use, perceived usefulness, behavioral intention to use and LMS use through structural equation modelling. The participants were 216 undergraduate students from a local university in Malaysia. The result of the study revealed that system interactivity had a significant effect on perceived usefulness, but not on perceived ease of use; technical support had a significant effect on perceived ease of use, but not on perceived usefulness.

  12. Reducing nuclear danger through intergovernmental technical exchanges on nuclear materials safety management

    International Nuclear Information System (INIS)

    Jardine, L.J.; Peddicord, K.L.; Witmer, F.E.; Krumpe, P.F.; Lazarev, L.; Moshkov, M.

    1997-01-01

    The United States and Russia are dismantling nuclear weapons and generating hundreds of tons of excess plutonium and high enriched uranium fissile nuclear materials that require disposition. The U.S. Department of Energy and Russian Minatom organizations.are planning and implementing safe, secure storage and disposition operations for these materials in numerous facilities. This provides a new opportunity for technical exchanges between Russian and Western scientists that can establish an improved and sustained common safety culture for handling these materials. An initiative that develops and uses personal relationships and joint projects among Russian and Western participants involved in fissile nuclear materials safety management contributes to improving nuclear materials nonproliferation and to making a safer world. Technical exchanges and workshops are being used to systematically identify opportunities in the nuclear fissile materials facilities to improve and ensure the safety of workers, the public, and the environment

  13. The development of technical database of advanced spent fuel management process

    International Nuclear Information System (INIS)

    Ro, Seung Gy; Byeon, Kee Hoh; Song, Dae Yong; Park, Seong Won; Shin, Young Jun

    1999-03-01

    The purpose of this study is to develop the technical database system to provide useful information to researchers who study on the back end nuclear fuel cycle. Technical database of advanced spent fuel management process was developed for a prototype system in 1997. In 1998, this database system is improved into multi-user systems and appended special database which is composed of thermochemical formation data and reaction data. In this report, the detailed specification of our system design is described and the operating methods are illustrated as a user's manual. Also, expanding current system, or interfacing between this system and other system, this report is very useful as a reference. (Author). 10 refs., 18 tabs., 46 fig

  14. Precision Departure Release Capability (PDRC): NASA to FAA Research Transition

    Science.gov (United States)

    Engelland, Shawn; Davis, Thomas J.

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and

  15. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  16. Implementation of burnup credit in spent fuel management systems. Proceedings of a technical committee meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-08-01

    The purpose of this Technical Committee Meeting was to explore the status of international activities related to the use of burnup credit for spent fuel applications. This was the second major meeting on the issues of burnup credit for spent fuel management systems held since the IAEA began to monitor the uses of burnup credit in spent fuel management systems in 1997. Burnup credit for wet and dry storage systems is needed in many Member States to allow for increased initial fuel enrichment, and to increase the storage capacity and thus to avoid the need for extensive modifications of the spent fuel management systems involved. This document contains 31 individual papers presented at the Meeting; each of the papers was indexed separately.

  17. Implementation of burnup credit in spent fuel management systems. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    2001-08-01

    The purpose of this Technical Committee Meeting was to explore the status of international activities related to the use of burnup credit for spent fuel applications. This was the second major meeting on the issues of burnup credit for spent fuel management systems held since the IAEA began to monitor the uses of burnup credit in spent fuel management systems in 1997. Burnup credit for wet and dry storage systems is needed in many Member States to allow for increased initial fuel enrichment, and to increase the storage capacity and thus to avoid the need for extensive modifications of the spent fuel management systems involved. This document contains 31 individual papers presented at the Meeting; each of the papers was indexed separately

  18. A strategy to improve skills in pharmaceutical supply management in East Africa: the regional technical resource collaboration for pharmaceutical management

    Directory of Open Access Journals (Sweden)

    Minzi Omary

    2008-12-01

    Full Text Available Abstract Background International initiatives such as the Global Fund to Fight AIDS, Tuberculosis and Malaria, the President's Emergency Plan for AIDS Relief and the President's Malaria Initiative have significantly increased availability and access to medicines in some parts of the developing world. Despite this, however, skills remain limited on quantifying needs for medications and ordering, receiving and storing medications appropriately; recording medications inventories accurately; distributing medications for use appropriately; and advising patients on how to use medications appropriately. The Regional Technical Resource Collaboration for Pharmaceutical Management (RTRC has been established to help address the problem of skills shortage in pharmaceutical management in East Africa. Methods The initiative brings together academic institutions from four East African countries to participate in skills-building activities in pharmaceutical supply management. The initiative targeted the institutions' ability to conduct assessments of pharmaceutical supply management systems and to develop and implement effective skills-building programmes for pharmaceutical supply chain management. Results Over a two-year period, the RTRC succeeded in conducting assessments of pharmaceutical supply management systems and practices in Kenya, Rwanda, Tanzania and Uganda. In 2006, the RTRC participated in a materials-development workshop in Kampala, Uganda, and contributed to the development of comprehensive HIV/AIDS pharmaceutical management training materials; these materials are now widely available in all four countries. In Tanzania and Uganda the RTRC has been involved with the training of health care workers in HIV/AIDS pharmaceutical management. In Kenya, Tanzania and Uganda the RTRC has been conducting operations research to find solutions to their countries' skills-shortage problems. Some of the interventions tested include applying and evaluating the

  19. The Consequences of the FAA not Offering Emergency Agricultural UAS Rules for Water Conservation During the 2012 Drought

    Science.gov (United States)

    Darling, R. G.

    2016-12-01

    The FAA's policies for agricultural Unmanned Aerial Systems (UAS) is essential towards preservation and optimization of water use in the parched Western United States. Had FAA applied emergency rules putting farmers on equal-footing with hobbyists for sUAS use at the beginning of the 2012 drought, the Western US could have been able to save approximately 3 Million/AF of water through improved irrigation management. For perspective, Los Angeles city's annual current consumption is 587,000 acre-feet. This study uses various assumptions about developed water use in agriculture and urban areas to determine water use, energy consumption, monetary loss through delay in FAA regulations. If the saved water was added to the ground the energy savings could have been approximately 1.27 Terra-Watt hours, enough energy to power the entire University of California system for 5 years. It remains unclear if new FAA regulations are sufficiently permissive to allow for widespread adoption of sUAS based precision agriculture. Substantial opportunities exist for utilizing UAS traffic management software in rural areas of less crowed airspace: incorporating geofencing and a notification system to operators and air traffic control as an alternative to a difficult examination process.

  20. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  1. Using plant status data for off-site emergency management: Technical and political aspects

    International Nuclear Information System (INIS)

    Govaerts, P.

    2004-01-01

    Subsequent to the TMI and Chernobyl accidents, emergency management is investigating the possibility of taking balanced decisions on interventions as early as possible. This process relies more and more on in-plant data to assess the term of releases. The paper discusses the regulatory aspects of the communication related to the source term between the utility and the national authorities, and the authorities of a host country and neighbouring countries that may be affected. The technical aspects of the assessment process are summarised, with the emphasis on the handling of uncertainties. Notwithstanding the technical progress, the main dilemma for the decision makers remains the same. Risk management and prevention measures become more familiar to authorities. Utilities and national authorities have to get rid of complexes with respect to accidents covered by the accepted residual risk. International emergency management has to look for an organisation type ensuring the continuity of countermeasures independent of the presence of administrative borders, and with respect to national autonomies. (authors)

  2. Just In Time Value Chain Total Quality Management Part Of Technical Strategic Management Accounting

    Directory of Open Access Journals (Sweden)

    Lesi Hertati

    2015-08-01

    Full Text Available This article aims to determine Just In Time Value Chain Total Quality Management tqm as a technique in management accounting stategis.Tujuan Just In Time value chain or value chain Total Quality Management TQM is strategic for customer satisfaction in the long term obtained from the information. Quality information is the way to continuous improvement in order to increase the companys financial performance in the long term to increase competitive advantage. Strategic Management Accounting process gather competitor information explore opportunities to reduce costs integrate accounting with emphasis on the strategic position of the competition is a great plan. An overall strategic plan interrelated and serves as the basis for achieving targets or goals ahead.

  3. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    National Research Council Canada - National Science Library

    Pisano, N

    2002-01-01

    ...) and in private industry. Currently-reported earned value data contains invaluable planning and budget information with proven techniques for program management, however, shortcomings of the system are its emphasis...

  4. Study of the capability for rapid warnings of solar flare radiation hazards to aircraft. Part I. Forecasts and warnings of solar flare radiation hazards. Part II. An FAA polar flight solar cosmic radiation forecast/warning communication system study. Technical memo

    International Nuclear Information System (INIS)

    Sauer, H.H.; Stonehocker, G.H.

    1977-04-01

    The first part of the report provides background information on the occurrence of solar activity and the consequent sporadic production of electromagnetic and particle emissions from the sun. A summary is given of the current procedures for the forecasting of solar activity together with procedures used to verify these forecasts as currently available. A summary of current forecasting of radiation hazards as provided in support of the Concorde SST program is also given. The second part of the report describes a forecast message distribution system developed in conjunction with solar cosmic radiation forecasts and warnings of the Space Environment Laboratory of NOAA for the Federal Aviation Administration's (FAA) Office of Aviation Medicine. The study analyzes the currently available and future aeronautical telecommunication system facilities to determine an optimum system to distribute forecasts to the preflight planning centers in the international flight service stations for polar-flying subsonic and supersonic transport (SST) type aircraft. Also recommended for the system are timely and reliable distribution of warnings to individual in-flight aircraft in polar areas by the responsible air traffic control authority

  5. Establishing a scientific and technical information program: Planning and resource management

    Science.gov (United States)

    Blados, Walter R.

    1992-01-01

    In the last 50 years, technological advances have accelerated at a rate unprecedented in history. We are experiencing a tremendous expansion of scientific and technological effort in many directions, and the result is a fantastic increase in the accumulation of scientific and technical information (STI) and knowledge. An integral part of the research and development (R&D) process is the STI associated with it. STI is both a raw material (input) and a product (output) of this process. The topics addressed include the following: the value of STI, management of an STI program, program policy and guidance, organizational structure, data sources, training/orientation, and the current information environment.

  6. Management and technical requirements for laboratories in charge of water monitoring

    International Nuclear Information System (INIS)

    Ottaviani, M.; Bonadonna, L.; Lucentini, L.; Pettine, P.

    2008-01-01

    This report completes the series of volumes focused on microbiological (Rapporti ISTISAN 07/5) and chemical methods (Rapporti ISTISAN 07/31) for the monitoring of water intended for human consumption according to the Italian Legislative Decree 31/2001 (transposition of European Directive 98/83/EC) and its integrations. The guidelines here presented concern management and technical requirements for laboratories in charge of testing parameters required by the Decree also taking into account the criteria stated by the standard UNI CEI EN ISO/IEC 17025 [it

  7. CSNI Technical Opinion Papers No. 15 - Ageing management of nuclear fuel cycle facilities

    International Nuclear Information System (INIS)

    Nocture, Pierre; Daubard, Jean-Paul; Lhomme, Veronique; Martineau, Dominique; Blundell, Neil; Conte, Dorothee; Dobson, Martin; Gmal, Bernhard; Hiltz, Thomas; Ueda, Yoshinori

    2012-01-01

    Managing the ageing of fuel cycle facilities (FCFs) means, as for other nuclear installations, ensuring the availability of required safety functions throughout their service life while taking into account the changes that occur with time and use. This technical opinion paper identifies a set of good practices by benchmarking strategies and good practices on coping with physical ageing and obsolescence from the facility design stage until decommissioning. It should be of particular interest to nuclear safety regulators, fuel cycle facilities operators and fuel cycle researchers [fr

  8. Thirteenth annual report of the Technical Advisory Committee on the Nuclear Fuel Waste Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-15

    This report details activities since the last reporting period by the Technical Advisory Committee (TAC). The emphasis of the work in the Canadian Nuclear Fuel Waste Management Program (CNFWMP) has been on the writing of the Environmental Impact Statement (EIS) and the associated set of the primary reference document as well as supporting documents. These are in preparation for submission to the Environmental Assessment Review Panel who will lead the national evaluation of the disposal concept under the auspices of the Federal Environmental Assessment Review Office (FEARO).

  9. Risk management: integration of social and technical risk variables into safety assessments of LWR'S

    International Nuclear Information System (INIS)

    Turnage, J.J.; Husseiny, A.A.

    1980-01-01

    A risk management methodology is developed here to formalize the acceptability levels of commercial LWR power plants via the estimation of risk levels acceptable to the public and the integration of such estimates into risk-benefit analysis. Utility theory is used for developing preference models based on value trade-offs among multiple objectives and uncertainties about the impact of alternatives. The method involves reducing the various variables affecting safety acceptability decisions to a single function that provides a metric for acceptability levels. The function accomondates for technical criteria related to design and licensing decisions, as well as public reactions to certain choices

  10. Highly Automated Arrival Management and Control System Suitable for Early NextGen

    Science.gov (United States)

    Swenson, Harry N.; Jung, Jaewoo

    2013-01-01

    This is a presentation of previously published work conducted in the development of the Terminal Area Precision Scheduling and Spacing (TAPSS) system. Included are concept and technical descriptions of the TAPSS system and results from human in the loop simulations conducted at Ames Research Center. The Terminal Area Precision Scheduling and Spacing system has demonstrated through research and extensive high-fidelity simulation studies to have benefits in airport arrival throughput, supporting efficient arrival descents, and enabling mixed aircraft navigation capability operations during periods of high congestion. NASA is currently porting the TAPSS system into the FAA TBFM and STARS system prototypes to ensure its ability to operate in the FAA automation Infrastructure. NASA ATM Demonstration Project is using the the TAPSS technologies to provide the ground-based automation tools to enable airborne Interval Management (IM) capabilities. NASA and the FAA have initiated a Research Transition Team to enable potential TAPSS and IM Technology Transfer.

  11. Designing water demand management schemes using a socio-technical modelling approach.

    Science.gov (United States)

    Baki, Sotiria; Rozos, Evangelos; Makropoulos, Christos

    2018-05-01

    Although it is now widely acknowledged that urban water systems (UWSs) are complex socio-technical systems and that a shift towards a socio-technical approach is critical in achieving sustainable urban water management, still, more often than not, UWSs are designed using a segmented modelling approach. As such, either the analysis focuses on the description of the purely technical sub-system, without explicitly taking into account the system's dynamic socio-economic processes, or a more interdisciplinary approach is followed, but delivered through relatively coarse models, which often fail to provide a thorough representation of the urban water cycle and hence cannot deliver accurate estimations of the hydrosystem's responses. In this work we propose an integrated modelling approach for the study of the complete socio-technical UWS that also takes into account socio-economic and climatic variability. We have developed an integrated model, which is used to investigate the diffusion of household water conservation technologies and its effects on the UWS, under different socio-economic and climatic scenarios. The integrated model is formed by coupling a System Dynamics model that simulates the water technology adoption process, and the Urban Water Optioneering Tool (UWOT) for the detailed simulation of the urban water cycle. The model and approach are tested and demonstrated in an urban redevelopment area in Athens, Greece under different socio-economic scenarios and policy interventions. It is suggested that the proposed approach can establish quantifiable links between socio-economic change and UWS responses and therefore assist decision makers in designing more effective and resilient long-term strategies for water conservation. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. Knowledge Management in Scientific and Technical Support Organizations for Regulatory Bodies: SEC NRS Experience

    International Nuclear Information System (INIS)

    Saulskaya, N.

    2016-01-01

    Full text: Nuclear industry, similar to other high-tech industries, is based on knowledge and to a great extent depends on personnel qualification, their skills and abilities. Knowledge management processes were recognized of the utmost importance for the IAEA. The IAEA GA adopted a number of resolutions on nuclear knowledge. In this context, knowledge management is considered as an integrated, systematic approach to the process of assessment, obtaining, development, distribution, use, transfer and maintenance of knowledge related to achievement of strategic targets of organization development. KM makes it possible to learn lessons from its own experience. The report presents a long-term experience of SEC NRS in knowledge management and capacity building, which is critically important for SEC NRS as scientific and technical support organization for Rostechnadzor. KM in SEC NRS is performed through the HRM, primarily through HRD, assessment, motivation of the labor activity, and regulation of social-psychological processes. The practice of implementation of NKM through the functions of human resources management is of particular interest for embarking countries. The best practices will be reflected in the IAEA Safety Report “Knowledge Management for Regulatory Bodies and TSO”, which is currently being developed by a team of the IAEA experts. (author

  13. CSNI technical opinion papers no.5. Managing and regulating organisational change in nuclear installations

    International Nuclear Information System (INIS)

    2004-01-01

    Nuclear licensees are increasingly required to adapt to a more challenging commercial environment as electricity markets are liberalized. One of the costs that is often perceived as being amenable to control is staffing, and hence there is significant exploration of new strategies for managing this cost - for example, by reducing staffing levels, changing organisational structures, adopting new shift strategies, introducing new technology or increasing the proportion of work carried out by external contractors. However, if changes to staffing levels or organisational structures and systems are inadequately conceived or executed they have the potential to affect the way in which safety is managed. In this context, the NEA Committee on the Safety of Nuclear Installations (CSNI) and its Special Expert Group on Human and Organisational Factors (SEGHOF) organised an international workshop to discuss the management and regulation of organisational change in 2001. This technical opinion paper distills the findings of that workshop and sets out the factors that regulatory bodies might reasonably expect to be addressed within licensees arrangements to manage organisational change. The paper should be of particular interest to both regulators and managers of nuclear utilities. (author)

  14. Technical and management information system: The tool for professional productivity on the space station program

    Science.gov (United States)

    Montoya, G.; Boldon, P.

    1985-01-01

    The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.

  15. Information Management Tools for Classrooms: Exploring Database Management Systems. Technical Report No. 28.

    Science.gov (United States)

    Freeman, Carla; And Others

    In order to understand how the database software or online database functioned in the overall curricula, the use of database management (DBMs) systems was studied at eight elementary and middle schools through classroom observation and interviews with teachers and administrators, librarians, and students. Three overall areas were addressed:…

  16. State Policies on Human Capital Resource Management: Minnesota. Human Capital Resource Management Technical Brief

    Science.gov (United States)

    Bhatt, Monica; Behrstock, Ellen; Cushing, Ellen; Wraight, Sara

    2010-01-01

    Training, recruiting, developing, and supporting talented and effective educators throughout their careers is known as human capital resource management (HCRM) in education. HCRM has been identified in recent literature as one of the ways in which districts and states may increase school effectiveness and improve student learning (Heneman &…

  17. State Policies on Human Capital Resource Management: Wisconsin. Human Capital Resource Management Technical Brief

    Science.gov (United States)

    Cushing, Ellen; Bhatt, Monica; Wraight, Sara; Behrstock, Ellen; Meyer, Cassandra

    2010-01-01

    Training, recruiting, developing, and supporting talented and effective educators throughout their careers is known as human capital resource management (HCRM) in education. HCRM has been identified in recent literature as one of the ways in which districts and states may increase school effectiveness and improve student learning (Heneman &…

  18. State Policies on Human Capital Resource Management: Indiana. Human Capital Resource Management Technical Brief

    Science.gov (United States)

    Meyer, Cassandra; Bhatt, Monica; Wraight, Sara; Behrstock, Ellen; Cushing, Ellen

    2010-01-01

    Training, recruiting, developing, and supporting talented and effective educators throughout their careers is known as human capital resource management (HCRM) in education. HCRM has been identified in recent literature as one of the ways in which districts and states may increase school effectiveness and improve student learning (Heneman &…

  19. State Policies on Human Capital Resource Management: Iowa. Human Capital Resource Management Technical Brief

    Science.gov (United States)

    Behrstock, Ellen; Bhatt, Monica; Cushing, Ellen; Wraight, Sara

    2010-01-01

    Training, recruiting, developing, and supporting talented and effective educators throughout their careers is known as human capital resource management (HCRM) in education. HCRM has been identified in recent literature as one of the ways in which districts and states may increase school effectiveness and improve student learning (Heneman &…

  20. State Policies on Human Capital Resource Management: Michigan. Human Capital Resource Management Technical Brief

    Science.gov (United States)

    Meyer, Cassandra; Bhatt, Monica; Wraight, Sara; Behrstock, Ellen; Cushing, Ellen

    2010-01-01

    Training, recruiting, developing, and supporting talented and effective educators throughout their careers is known as human capital resource management (HCRM) in education. HCRM has been identified in recent literature as one of the ways in which districts and states may increase school effectiveness and improve student learning (Heneman &…

  1. State Policies on Human Capital Resource Management: Illinois. Human Capital Resource Management Technical Brief

    Science.gov (United States)

    Meyers, Coby; Bhatt, Monica; Wraight, Sara; Behrstock, Ellen; Cushing, Ellen

    2010-01-01

    Training, recruiting, developing, and supporting talented and effective educators throughout their careers is known as human capital resource management (HCRM) in education. HCRM has been identified in recent literature as one of the ways in which districts and states may increase school effectiveness and improve student learning (Heneman &…

  2. State Policies on Human Capital Resource Management: Ohio. Human Capital Resource Management Technical Brief

    Science.gov (United States)

    Bhatt, Monica; Wraight, Sara; Behrstock, Ellen; Cushing, Ellen

    2010-01-01

    Training, recruiting, developing, and supporting talented and effective educators throughout their careers is known as human capital resource management (HCRM) in education. HCRM has been identified in recent literature as one of the ways in which districts and states may increase school effectiveness and improve student learning (Heneman &…

  3. A Mirror for Managers: Using Simulation to Develop Management Teams. Technical Report 23.

    Science.gov (United States)

    Kaplan, Robert E.; And Others

    Although simulation is among the least common of the many methods consultants employ to stimulate team development, realistic simulation can help in the diagnosis of management teams. Simulations fill a gap in the repertoire of data collection methods for organizational diagnosis and development by affording an opportunity for direct observation…

  4. Evaluation of the FAA Advanced Flow Control Procedures.

    Science.gov (United States)

    1972-01-01

    The report is an evaluation of the present FAA Advanced Flow Control Procedures (AFCP), based on data gathered from its implementation on February 5, 1971 and on a fast-time digital simulation of traffic feeding into the NY airports on that day. The ...

  5. Development of a technical scheme for the management of chemical dangerous substances in hospitable environments

    International Nuclear Information System (INIS)

    Calleja Amador, C.E.

    2002-01-01

    The chemical substances that are used in the hospitals, and their remainders, represent risks for the environment, the health and security of those who work in these establishments, and of the civil population. The deficiency of a norm that establishes the directives for the handling responsible for such products in the hospitals that our country has motivated the elaboration of a technical scheme that serves as it guides for the correct manipulation, storage and safe disposition of chemical substances in the twenty-nine hospitals of the Caja Costarricense del Seguro Social, establishing Procedures of Standard Operation for its management. To development of the guideline proposal it took a sample of hospitals that includes three levels of comple complexity: national, regional and peripheral. Applying a methodology of evaluation of risks two factors of risk of hospitable were determined, the zones and the population but affected by the existence of chemical substances, which allowed to identify some operative deficiencies in the product handling diverse. The qualitative analysis of the results lead to the elaboration of a technical scheme that includes an instrument for the identification of risks, guideline for the management responsible for hospitable chemical substances, a friendly tool computations like complementary source of intelligence and the proposal of a governing group in charge of the monitoring of the fulfillment of these lineament. (Author) [es

  6. Three dimensional visualization breakthrough in analysis and communication of technical information for nuclear waste management

    International Nuclear Information System (INIS)

    Alexander, D.H.; Cerny, B.A.; Hill, E.R.; Krupka, K.M.; Smoot, J.L.; Smith, D.R.; Waldo, K.

    1990-11-01

    Computer graphics systems that provide interactive display and manipulation of three-dimensional data are powerful tools for the analysis and communication of technical information required for characterization and design of a geologic repository for nuclear waste. Greater understanding of site performance and repository design information is possible when performance-assessment modeling results can be visually analyzed in relation to site geologic and hydrologic information and engineering data for surface and subsurface facilities. In turn, this enhanced visualization capability provides better communication between technical staff and program management with respect to analysis of available information and prioritization of program planning. A commercially-available computer system was used to demonstrate some of the current technology for three-dimensional visualization within the architecture of systems for nuclear waste management. This computer system was used to interactively visualize and analyze the information for two examples: (1) site-characterization and engineering data for a potential geologic repository at Yucca Mountain, Nevada; and (2) three-dimensional simulations of a hypothetical release and transport of contaminants from a source of radionuclides to the vadose zone. Users may assess the three-dimensional distribution of data and modeling results by interactive zooming, rotating, slicing, and peeling operations. For those parts of the database where information is sparse or not available, the software incorporates models for the interpolation and extrapolation of data over the three-dimensional space of interest. 12 refs., 4 figs

  7. [Teaching non-technical skills for critical incidents: Crisis resource management training for medical students].

    Science.gov (United States)

    Krüger, A; Gillmann, B; Hardt, C; Döring, R; Beckers, S K; Rossaint, R

    2009-06-01

    Physicians have to demonstrate non-technical skills, such as communication and team leading skills, while coping with critical incidents. These skills are not taught during medical education. A crisis resource management (CRM) training was established for 4th to 6th year medical students using a full-scale simulator mannikin (Emergency Care Simulator, ECS, METI). The learning objectives of the course were defined according to the key points of Gaba's CRM concept. The training consisted of theoretical and practical parts (3 simulation scenarios with debriefing). Students' self-assessment before and after the training provided the data for evaluation of the training outcome. A total of 65 students took part in the training. The course was well received in terms of overall course quality, debriefings and didactic presentation, the mean overall mark being 1.4 (1: best, 6: worst). After the course students felt significantly more confident when facing incidents in clinical practice. The main learning objectives were achieved. The effectiveness of applying the widely used ECS full-scale simulator in interdisciplinary teaching has been demonstrated. The training exposes students to crisis resource management issues and motivates them to develop non-technical skills.

  8. A Study of the Relationship between Personality Types and the Acceptance of Technical Knowledge Management Systems (TKMS)

    Science.gov (United States)

    Sullivan, Maureen S.

    2012-01-01

    Technical knowledge management systems (TKMSs) are not achieving the usage (acceptance) and the benefits that have been forecasted and are therefore, not enhancing competitive advantage and profits in organizations (Comb, 2004, "Assessing customer relationship management strategies for creating competitive advantage in electronic…

  9. The database system for the management of technical documentations of PWR fuel design project using CD-ROM

    International Nuclear Information System (INIS)

    Park, Bong Sik; Lee, Won Jae; Ryu, Jae Kwon; Jo, In Hang; Chang, Jong Hwa.

    1996-12-01

    In this report, the database system developed for the management of technical documentation of PWR fuel design project using CD-ROM (compact disk - read only memory) is described. The database system, KIRDOCM (KAERI Initial and Reload Fuel project technical documentation management), is developed and installed on PC using Visual Foxpro 3.0. Descriptions are focused on the user interface of the KIRDOCM. Introduction addresses the background and concept of the development. The main chapter describes the user requirements, the analysis of computing environment, the design of KIRDOCM, the implementation of the KIRDOCM, user's manual of KIRDOCM and the maintenance of the KIRDOCM for future improvement. The implementation of KIRDOCM system provides the efficiency in the management, maintenance and indexing of the technical documents. And, it is expected that KIRDOCM may be a good reference in applying Visual Foxpro for the development of information management system. (author). 2 tabs., 13 figs., 8 refs

  10. New technical knowledge to be implemented to the revision of rules on pipe wall thinning management for PWR plants

    International Nuclear Information System (INIS)

    Hirai, Junya; Nakamura, Takao; Amano, Yoichi

    2013-01-01

    Rules for PWR plant pipe wall thinning management were formulated by the Japan Society of Mechanical Engineers in 2006. Since then thinning management of Japanese PWR plants has been carried out based on this rule. Pipe wall thinning phenomena to be dealt with in this rule have been identified in many piping components of power plants. New technical knowledge has been accumulated since the issuance of 2006 edition. We have formulated these knowledge and information about the thinning phenomena in PWR power plants. Given the history of application of this rule, we have to make our best effort to carry out a study of latest technical knowledge and implement them to the revision of rule and improve pipe wall thinning management. This paper summarizes the new technical knowledge and basis to be implemented to the revision of rules on pipe wall thinning management for PWR plants in Japan. (author)

  11. Information management systems for integrating the technical data and regulatory requirements of environmental restoration activities

    International Nuclear Information System (INIS)

    Geffen, C.A.; Garrett, B.A.; Walter, M.B.

    1990-03-01

    Current environmental regulations require that comprehensive planning be conducted before remediating a hazardous waste site to characterize the nature and extent of site contamination, calculate the risk to the public, and assess the effectiveness of various remediation technologies. Remediation of Department of Energy (DOE) sites contaminated with hazardous or mixed wastes will require the effective integration of scientific and engineering data with regulatory and institutional requirements. The information management challenge presented by waste site cleanup activities goes beyond merely dealing with the large quantity of data that will be generated. The information must be stored, managed, and presented in a way that provides some consistency in approach across sites, avoids duplication of effort, and facilitates responses to requests for information from the regulators and the public. This paper provides background information on the regulatory requirements for data gathering and analysis for environmental restoration activities, and outlines the data and information management requirements for completing the pre-remediation phases of an environmental restoration project. Information management systems for integrating the regulatory and institutional requirements of the environmental restoration process with the technical data and analysis requirements are also described. 7 refs

  12. Project Manager’s Guide to the Scientific and Technical Information (STINFO) Program and Technical Publications Process

    Science.gov (United States)

    1993-12-01

    Iaporta .. y be definitive for the tubjoct proaentod, exploratory in natura, or an evaluation of critical Aubayato• or of technical problema , 4...International Security 9 Social and Natural Science Studies Field 41 Edit: (Type 3) -Entry of an invalid code when Performance Type is "C" or "M" will...analysis SF Foreign area social science research SP Foreign area policy planAing research BF Identifies databases with data on foreign forces or

  13. Air Traffic Control: Immature Software Acquisition Processes Increase FAA System Acquisition Risks

    Science.gov (United States)

    1997-03-01

    The General Accounting Office (GAO) at the request of Congress reviewed (1) : the maturity of Federal Aviation Administration's (FAA's) Air Traffic Control : (ATC) modernization software acquisition processes, and (2) the steps/actions : FAA has unde...

  14. Index to FAA Office of Aviation Medicine reports : 1961 through 1995.

    Science.gov (United States)

    1996-01-01

    An index to Federal Aviation Administration (FAA) Office of Aviation Medicine Reports (1964-1995) and Civil Aeromedical Institute Reports is presented for those engaged in aviation medicine and related activities. The index lists all FAA aviation med...

  15. A technical investigation on tools and concepts for sustainable management of the subsurface in The Netherlands.

    Science.gov (United States)

    Griffioen, Jasper; van Wensem, Joke; Oomes, Justine L M; Barends, Frans; Breunese, Jaap; Bruining, Hans; Olsthoorn, Theo; Stams, Alfons J M; van der Stoel, Almer E C

    2014-07-01

    In response to increasing use of the subsurface, there is a need to modernise policies on sustainable use of the subsurface. This holds in particular for the densely populated Netherlands. We aimed to analyse current practice of subsurface management and the associated pressure points and to establish a conceptual overview of the technical issues related to sustainable management of the subsurface. Case studies on the exploitation of subsurface resources (including spatial use of the subsurface) were analysed, examining social relevance, environmental impact, pressure points and management solutions. The case studies ranged from constructing underground garages to geothermal exploitation. The following issues were identified for the technological/scientific aspects: site investigation, suitability, risk assessment, monitoring and measures in the event of failure. Additionally, the following general issues were identified for the administrative aspects: spatial planning, option assessment, precaution, transparency, responsibility and liability. These issues were explored on their technological implications within the framework of sustainable management of the subsurface. This resulted into the following key aspects: (1) sustainability assessment, (2) dealing with uncertainty and (3) policy instruments and governance. For all three aspects, different options were identified which might have a legal, economic or ethical background. The technological implications of these backgrounds have been identified. A set of recommendations for sustainable management of the subsurface resources (incl. space) was established: (1) management should be driven by scarcity, (2) always implement closed loop monitoring when the subsurface activities are high-risk, (3) when dealing with unknown features and heterogeneity, apply the precautionary principle, (4) responsibility and liability for damage must be set out in legislation and (5) sustainability should be incorporated in all

  16. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    International Nuclear Information System (INIS)

    Kallenbach-Herbert, Beate; Bergmans, Anne; Martell, Meritxell; Schroeder, Jantine

    2015-01-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  17. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate [Oeko-Institut e.V., Darmstadt (Germany); Bergmans, Anne [Antwerp Univ. (Belgium); Martell, Meritxell [Merience Strategic Thinking, Olerdola (Spain); Schroeder, Jantine [Antwerp Univ. (Belgium); SCK - CEN, Mol (Belgium)

    2015-07-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  18. 49 CFR 26.105 - What enforcement actions apply in FAA programs?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false What enforcement actions apply in FAA programs? 26... Enforcement § 26.105 What enforcement actions apply in FAA programs? (a) Compliance with all requirements of this part by airport sponsors and other recipients of FAA financial assistance is enforced through the...

  19. 76 FR 44978 - Notice of FAA Intent To Carry Over Airport Improvement Program (AIP) Entitlement Funds

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [Docket No. 2011-0786] Notice of FAA... notify, in writing, the designated representative in the appropriate FAA Regional or Airports District... apportioned for fiscal year 2011, regardless of whether the FAA has authority to obligate those funds. After...

  20. 76 FR 56968 - [Docket No. FAA-2011-0490; Airspace Docket No. 11-AWP-5

    Science.gov (United States)

    2011-09-15

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA-2011... Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action modifies Class E airspace at Tonopah, NV, to... reference action under 1 CFR Part 51, subject to the annual revision of FAA Order 7400.9 and publication of...

  1. 14 CFR 11.38 - What public comment procedures does the FAA follow for Special Conditions?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false What public comment procedures does the FAA... § 11.38 What public comment procedures does the FAA follow for Special Conditions? Even though the Administrative Procedure Act does not require notice and comment for rules of particular applicability, FAA does...

  2. 14 CFR 39.5 - When does FAA issue airworthiness directives?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false When does FAA issue airworthiness directives? 39.5 Section 39.5 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS DIRECTIVES § 39.5 When does FAA issue airworthiness directives? FAA issues...

  3. 14 CFR 11.73 - How does FAA process petitions for rulemaking?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false How does FAA process petitions for... for Exemption § 11.73 How does FAA process petitions for rulemaking? After we have determined the disposition of your petition, we will contact you in writing about our decision. The FAA may respond to your...

  4. 14 CFR Appendix B to Part 187 - Fees for FAA Services for Certain Flights

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Fees for FAA Services for Certain Flights B... (CONTINUED) ADMINISTRATIVE REGULATIONS FEES Pt. 187, App. B Appendix B to Part 187—Fees for FAA Services for... pay a fee for the FAA's rendering or providing certain services, including but not limited to the...

  5. 14 CFR 11.31 - How does FAA process direct final rules?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false How does FAA process direct final rules? 11... PROCEDURAL RULES GENERAL RULEMAKING PROCEDURES Rulemaking Procedures General § 11.31 How does FAA process direct final rules? (a) A direct final rule will take effect on a specified date unless FAA receives an...

  6. 14 CFR 11.39 - How may I participate in FAA's rulemaking process?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false How may I participate in FAA's rulemaking process? 11.39 Section 11.39 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... participate in FAA's rulemaking process? You may participate in FAA's rulemaking process by doing any of the...

  7. 47 CFR 17.7 - Antenna structures requiring notification to the FAA.

    Science.gov (United States)

    2010-10-01

    ... the FAA. 17.7 Section 17.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL CONSTRUCTION... Antenna structures requiring notification to the FAA. A notification to the Federal Aviation... area of each heliport specified in paragraph (d) of this section. (c) When requested by the FAA, any...

  8. 14 CFR 11.75 - Does FAA invite public comment on petitions for rulemaking?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Does FAA invite public comment on petitions... Rulemaking and for Exemption § 11.75 Does FAA invite public comment on petitions for rulemaking? Generally, FAA does not invite public comment on petitions for rulemaking. ...

  9. 76 FR 7893 - FAA Policy Statement on Expungement of Certain Enforcement Actions

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration FAA Policy Statement on Expungement.... SUMMARY: The FAA has temporarily suspended its policy of expunging certain records of legal enforcement... effects on pilots is available at: http://www.faa.gov/pilots/lic_cert/pria/guidance/pilotfaq . Further...

  10. A preliminary redrafting of the Italian technical guide no.26 on radioactive waste management

    International Nuclear Information System (INIS)

    Tocci, M.

    1993-01-01

    The recent National Energy Plan confirms the need for reprocessing of the nuclear spent fuel arising from the Nuclear Power Plants (NPPs) that were definitively put out of operation after Chernobyl accident. Two campaigns concerning the Italian spent fuel reprocessing are starting at this time. The first-one is related to LATINA (MAGNOX, GCR 160 MWe) while the second one will concern GARIGLIANO (BWR 160 MWe), CAORSO (BWR 840 MWe) and TRINO (PWR, 200 MWe). The first campaign will involve about 600 tons of MAGNOX spent fuel arising from LATINA NPP which will be reprocessed in the next future by BNFL (British Nuclear Fuel Limited) at Sellafield. The vitrified High Level Wastes (HLW) shall return to Italy starting from 1994. ENEA-DISP (Italian directorate for Nuclear Safety) has received from BNFL the technical specifications of the glass blocks. The approval of those specifications is scheduled by the end of 1993, in order to allow the delivery of the wastes. During the licensing iter ENEA-DISP will use its own Technical Guide N. 26, which identifies and specifies the basic criteria and requirements for an appropriate waste management policy. (author). 4 figs., 5 refs

  11. Technical changes that would contribute to success in the civilian radioactive waste management program

    International Nuclear Information System (INIS)

    Ramspott, L.D.

    1993-01-01

    Many changes have taken place since the SCP safety strategy was formulated; it needs to be revised or replaced. Four concepts would aid in the shift from a rigid, ecelctic, schedule-driven, all-or-nothing program to an incremental, evolving, and experimental but integrated program. These are a simple safety case, reversability, demonstrability, and decoupling operations of a repository from operation of reactors. A simple safety case based on containment can be made for a repository at Yucca Mountain. This containment strategy is based on the dryness of openings at Yucca Mountain, Extended Dry heat management, and long-lived containers. Reversibility is technically believable at Yucca Mountain because of extended retrievability and drift emplacement, if an MRS were co-located with the repository. Because the rock is unsaturated, extended retrievability is technically feasible at Yucca Mountain. Demonstrability could be improved at Yucca Mountain by planning for incremental progression toward operation and closure of a repository, possibly including a shift to underground retrievable storage. Demonstrability can also be improved by using natural analogs. Repository operation can be decoupled from reactor operation by use of an unconstrained MRS facility or at-reactor dry storage and multipurpose storage canister/casks

  12. U.S. spent nuclear fuel management: Political, fiscal, and technical feasibility

    International Nuclear Information System (INIS)

    Singer, Clifford

    2013-01-01

    Successful U.S. spent nuclear fuel management policy must satisfy political, fiscal, and technical constraints. Technical requirements have been thoroughly investigated in the United States and Nordic countries for volcanic tuff, salt, and granite. Fiscal planning requires an inflation-adjusted revenue stream and predictable real interest rate earnings on fund balances. A prompt solution satisfying political constraints requires compromise between the overlapping but distinct goals of seven different sets of interests at the federal level. Absent such compromise, there will be delay until sufficient support for one of three strategies evolves: (1) force the Yucca Mountain repository on Nevada, (2) open a centralized storage facility without coupling to repository licensing, or (3) follow a “consent-based” process for repository licensing. Formulations of each of these strategies to overcome impediments to their success are described. - Highlights: • U.S. spent nuclear fuel policy has been at an impasse. • No compromise on Yucca Mountain is at hand. • Yucca only, new repository, or no repository are options. • Success with each is more likely with sounder financing

  13. NASA,FAA,ONERA Swept-Wing Icing and Aerodynamics: Summary of Research and Current Status

    Science.gov (United States)

    Broeren, Andy

    2015-01-01

    NASA, FAA, ONERA, and other partner organizations have embarked on a significant, collaborative research effort to address the technical challenges associated with icing on large scale, three-dimensional swept wings. These are extremely complex phenomena important to the design, certification and safe operation of small and large transport aircraft. There is increasing demand to balance trade-offs in aircraft efficiency, cost and noise that tend to compete directly with allowable performance degradations over an increasing range of icing conditions. Computational fluid dynamics codes have reached a level of maturity that they are being proposed by manufacturers for use in certification of aircraft for flight in icing. However, sufficient high-quality data to evaluate their performance on iced swept wings are not currently available in the public domain and significant knowledge gaps remain.

  14. Efficiency potential of management and technical solutions for a construction object

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2014-01-01

    Full Text Available The authors investigate the models of efficiency potential of management and technical solutions for a construction object, which allows accounting for the influence of management-technological and administrative solutions in the process of implementing construction project. The solutions are represented by various factors – solitary integral potentials. The factors, which should be taken into account in the process of developing an integral model, are: development of general contracting structure, project decisions, management decisions, administrative decisions and ecological impact. In is necessary to develop the model, which will integrally put together the above mentioned factors of a construction project, observe and investigate other factors, create a model and get the opportunity not only to predict the endpoint of the future construction object on the stage of formulating technological requirements, but also to monitor the changes of this prognosis in time. The parameters of the integral potential will allow the system to obtain flexibility, which makes it possible to adjust to the changes usually taking place on a construction object and at the same time to aim for optimization of organizational, technological and administrative solutions in the process of reaching endpoint of construction.

  15. ANL Technical Support Program for DOE Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J.; Bourcier, W.L.; Morgan, L.E.; Nielsen, J.K.; Steward, S.A.; Ewing, R.C.; Wang, L.M.; Han, W.T.; Tomozawa, M.

    1992-03-01

    This report provides an overview of progress during FY 1991 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE, Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defenses Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are likely to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: (1) to review and evaluate available information on parameters that will be important in establishing the long-term performance of glass in a repository environment; (2) to perform testing to further quantify the effects of important variables where there are deficiencies in the available data; and (3) to initiate long-term testing that will bound glass performance under a range of conditions applicable to repository disposal

  16. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  17. Effect of pasture irrigation on the technical and management indicators of dairy farms

    Directory of Open Access Journals (Sweden)

    Flávio de Moraes

    2015-07-01

    Full Text Available The objective of this study was to evaluate the effect of pasture irrigation on the technical and management indicators of 20 demonstrative units participating in the “Balde Cheio” Program in the state of Rio de Janeiro from January to December 2011. The following variables were obtained: dam/labor ratio, herd size/labor ratio, milk yield/labor ratio, animals/production area, percentage of lactating cows, and milk yield. Return was analyzed considering gross margin, net margin, outcome (profit or loss, and profitability. The data were analyzed using the PASW 18.0 software. Pasture irrigation did not significantly alter the indicators studied. The greater profitability and return of farms using pasture irrigation were the consequence of better animal production rates/day and per ha/year. When gross margin, net margin and outcome using total revenue are considered, there is decapitalization of the farms. 

  18. The U.S. nuclear waste management program - technical progress at Yucca Mountain

    Energy Technology Data Exchange (ETDEWEB)

    Barrett, L.H. [U.S. Department of Energy (United States)

    2001-07-01

    This paper discusses the current status of a national program being developed by the U.S. Department of Energy for the management of spent nuclear fuel and high-level radioactive waste produced by civilian nuclear power generation and defense-related activities. In 1987 the U.S. Congress directed the Department to characterize the Yucca Mountain site in Nevada and determine its suitability for development of a geologic repository. This paper will focus on the technical progress that has been made after more than 15 years of scientific and engineering investigations at Yucca Mountain, and the remaining work that is being done to support a decision on whether to recommend the site for development of a geologic repository. (author)

  19. [Multilevel analysis of the technical efficiency of hospitals in the Spanish National Health System by property and type of management].

    Science.gov (United States)

    Pérez-Romero, Carmen; Ortega-Díaz, M Isabel; Ocaña-Riola, Ricardo; Martín-Martín, José Jesús

    2018-05-11

    To analyze technical efficiency by type of property and management of general hospitals in the Spanish National Health System (2010-2012) and identify hospital and regional explanatory variables. 230 hospitals were analyzed combining data envelopment analysis and fixed effects multilevel linear models. Data envelopment analysis measured overall, technical and scale efficiency, and the analysis of explanatory factors was performed using multilevel models. The average rate of overall technical efficiency of hospitals without legal personality is lower than hospitals with legal personality (0.691 and 0.876 in 2012). There is a significant variability in efficiency under variable returns (TE) by direct, indirect and mixed forms of management. The 29% of the variability in TE es attributable to the Region. Legal personality increased the TE of the hospitals by 11.14 points. On the other hand, most of the forms of management (different to those of the traditional hospitals) increased TE in varying percentages. At regional level, according to the model considered, insularity and average annual income per household are explanatory variables of TE. Having legal personality favours technical efficiency. The regulatory and management framework of hospitals, more than public or private ownership, seem to explain technical efficiency. Regional characteristics explain the variability in TE. Copyright © 2018 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  20. COMPARATIVE MULTIOBJECTIVE ANALYSIS OF COMPLICATED TECHNICAL AND SOCIAL SYSTEMS IN TERMS OF ECONOMICS AND MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Dmitrii Vital'evich Panov

    2016-01-01

    Full Text Available The article is devoted to the comparative multiobjective analysis of complicated technical and social systems in terms of economics and management. The difficulty of carrying out such comparison is determined by multidimensionality of the target application, diversity and qualitative variety of separate system elements, dissimilarity of technological conditions, under which they are created, and analogues used for the comparison. It is not about choosing the one “best” solution out of several alternatives, how it is required having the traditional optimization task setting, but about the comparison of home object to its analogues. Usually the purpose of such comparison consists in the assessment of its comparative objective efficiency. However, the object compared is the product of the respective technological chain. The resources used to create the object and analogues compared are always different as well as technologies used to transform resources to end products. It is the reason for the new problem to assess the management quality of own object creation as compared to the analogues. Objectives. The purpose is the development of effective approaches to the management quality assessment of complicated technical and social systems creation. Four multiobjective tasks of integral assessment are considered to solve the stated problem: objective efficiency assessment, assessment of all kinds of resources used, applied technology assessment and finally three-objective task to assess the management quality of object creation with assessed objective efficiency by using stated resources and technologies. The last task implies achievement of the highest objective efficiency with the use of less resource and less sophisticated technology that points at the higher management level. The stated task pertains to the class of multiobjective decision making where alternatives are distinguished by partial criteria and depend on the range of uncertain

  1. A parameter network and model pyramid for managing technical information flow

    International Nuclear Information System (INIS)

    Sinnock, S.; Hartman, H.A.

    1994-01-01

    Prototypes of information management tools have been developed that can help communicate the technical basis for nuclear waste disposal to a broad audience of program scientists and engineers, project managers, and informed observers from stakeholder organizations. These tools include system engineering concepts, parameter networks expressed as influence diagrams, associated model hierarchies, and a relational database. These tools are used to express relationships among data-collection parameters, model input parameters, model output parameters, systems requirements, physical elements of a system description, and functional analysis of the contribution of physical elements and their associated parameters in satisfying the system requirements. By organizing parameters, models, physical elements, functions, and requirements in a visually reviewable network and a relational database the severe communication challenges facing participants in the nuclear waste dialog can be addressed. The network identifies the influences that data collected in the field have on measures of repository suitability, providing a visual, traceable map that clarifies the role of data and models in supporting conclusions about repository suitability. The map allows conclusions to be traced directly to the underlying parameters and models. Uncertainty in these underlying elements can be exposed to open review in the context of the effects uncertainty has on judgements about suitability. A parameter network provides a stage upon which an informed social dialog about the technical merits of a nuclear waste repository can be conducted. The basis for such dialog must be that stage, if decisions about repository suitability are to be based on a repository's ability to meet requirements embodied in laws and regulations governing disposal of nuclear wastes

  2. Risk in technical and scientific studies: general introduction to uncertainty management and the concept of risk

    International Nuclear Information System (INIS)

    Apostolakis, G.E.

    2004-01-01

    George Apostolakis (MIT) presented an introduction to the concept of risk and uncertainty management and their use in technical and scientific studies. He noted that Quantitative Risk Assessment (QRA) provides support to the overall treatment of a system as an integrated socio-technical system. Specifically, QRA aims to answer the questions: - What can go wrong (e.g., accident sequences or scenarios)? - How likely are these sequences or scenarios? - What are the consequences of these sequences or scenarios? The Quantitative Risk Assessment deals with two major types of uncertainty. An assessment requires a 'model of the world', and this preferably would be a deterministic model based on underlying processes. In practice, there are uncertainties in this model of the world relating to variability or randomness that cannot be accounted for directly in a deterministic model and that may require a probabilistic or aleatory model. Both deterministic and aleatory models of the world have assumptions and parameters, and there are 'state-of-knowledge' or epistemic uncertainties associated with these. Sensitivity studies or eliciting expert opinion can be used to address the uncertainties in assumptions, and the level of confidence in parameter values can be characterised using probability distributions (pdfs). Overall, the distinction between aleatory and epistemic uncertainties is not always clear, and both can be treated mathematically in the same way. Lessons on safety assessments that can be learnt from experience at nuclear power plants are that beliefs about what is important can be wrong if a risk assessment is not performed. Also, precautionary approaches are not always conservative if failure modes are not identified. Nevertheless, it is important to recognize that uncertainties will remain despite a quantitative risk assessment: e.g., is the scenario list complete, are the models accepted as reasonable, and are parameter probability distributions representative of

  3. The design of management system guidelines and technical standards for the production of x-ray aircraft

    International Nuclear Information System (INIS)

    Dyah Palupi; Made Pramayuni

    2013-01-01

    Concept of management systems guidelines and technical standards X-ray Equipment Production arranged in order to prepare for the effective and efficient regulatory to ensure the safety of X-ray equipment production in Indonesia. The regulatory tools may the government policy or regulations. Authors proposed that BAPETEN develop guidelines for management system of x-ray equipment production by combining ISO 13485 with BAPETEN Chairman Regulation no.4 /2010. Author also suggested that BAPETEN make technical standards IEC 60601 as a mandatory standard in producing x-ray equipment. (author)

  4. [NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 2:] Technical communications in aeronautics: Results of an exploratory study. An analysis of managers' and nonmanagers' responses

    Science.gov (United States)

    Pinelli, Thomas E.; Glassman, Myron; Barclay, Rebecca O.; Oliu, Walter E.

    1989-01-01

    Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that aerospace managers and nonmanagers have different technical communications practices. Five assumptions were established for the analysis. Aerospace managers and nonmanagers were found to have different technical communications practices for three of the five assumptions tested. Although aerospace managers and nonmanagers were found to have different technical communications practices, the evidence was neither conclusive nor compelling that the presumption of difference in practices could be attributed to the duties performed by aerospace managers and nonmanagers.

  5. From conventional drainage to sustainable stormwater management: Beyond the technical challenges.

    Science.gov (United States)

    Goulden, Shula; Portman, Michelle E; Carmon, Naomi; Alon-Mozes, Tal

    2018-08-01

    Countries and cities are increasingly recognizing the value of adopting Sustainable Stormwater Management (SSWM) goals and measures. SSWM serves multiple hydrological, ecological, social and economic goals and can replace substantial parts of conventional drainage infrastructure. Following international experience in the socio-technical nature of transitions in stormwater management, this research investigates how socio-institutional factors enable the transition from conventional to sustainable stormwater management over time. The research is based on analysing available relevant documents, semi-structured interviews and focus groups, all in a single country case study (Israel). We found significant changes in professional awareness and discourse, some advances in professional standards of work and changes to the regulative system, supporting infiltration practices in particular. We concluded that the three-pillared socio-institutional framework, composed of cultural-cognitive, normative and regulative changes, was insightful for mapping factors supporting transition from conventional drainage to SSWM. Elements within the three pillars can work simultaneously and synergistically to achieve widespread change. At the same time, while SSWM always strives to achieve multiple goals, the order of priority of the various goals may differ from place to place and may change over time. Thus the transition process across the socio-institutional pillars should be renewed if and when the priority of goals changes. The urban and regional planning system can play a crucial role in enhancing the transition process from conventional to sustainable stormwater management. These conclusions may be relevant to other localities and countries that are struggling with such transitions to sustainability. Copyright © 2018 Elsevier Ltd. All rights reserved.

  6. Digital Aquifer - Integrating modeling, technical, software and policy aspects to develop a groundwater management tool

    Science.gov (United States)

    Tirupathi, S.; McKenna, S. A.; Fleming, K.; Wambua, M.; Waweru, P.; Ondula, E.

    2016-12-01

    Groundwater management has traditionally been observed as a study for long term policy measures to ensure that the water resource is sustainable. IBM Research, in association with the World Bank, extended this traditional analysis to include realtime groundwater management by building a context-aware, water rights management and permitting system. As part of this effort, one of the primary objectives was to develop a groundwater flow model that can help the policy makers with a visual overview of the current groundwater distribution. In addition, the system helps the policy makers simulate a range of scenarios and check the sustainability of the groundwater resource in a given region. The system also enables a license provider to check the effect of the introduction of a new well on the existing wells in the domain as well as the groundwater resource in general. This process simplifies how an engineer will determine if a new well should be approved. Distance to the nearest well neighbors and the maximum decreases in water levels of nearby wells are continually assessed and presented as evidence for an engineer to make the final judgment on approving the permit. The system also facilitates updated insights on the amount of groundwater left in an area and provides advice on how water fees should be structured to balance conservation and economic development goals. In this talk, we will discuss the concept of Digital Aquifer, the challenges in integrating modeling, technical and software aspects to develop a management system that helps policy makers and license providers with a robust decision making tool. We will concentrate on the groundwater model developed using the analytic element method that plays a very important role in the decision making aspects. Finally, the efficiency of this system and methodology is shown through a case study in Laguna Province, Philippines, which was done in collaboration with the National Water Resource Board, Philippines and World

  7. Technical forums as an instrument for knowledge management in oil pipelines and terminals companies: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the experience of TRANSPETRO's Oil Pipelines and Terminals Unit regarding an institutionalized knowledge management (KM) process of systematically promoting technical forums focused on: pipeline and terminal operations; industrial maintenance; and right-of-way activities management. This empirical work adds evidence that in the model of cooperative and communicative knowledge management it is necessary to motivate staff to provide the company with their tacit knowledge and to take a proactive part in knowledge management processes, particularly in technical forums. Within this KM perspective, technical forums have been held by TRANSPETRO for the following purposes: to discuss the main barriers and challenges the oil pipelines and terminals unit has to face in the coming years; to share and disseminate good practices concerning oil pipeline and terminal activities; to discuss new processes, methods and equipment developments with potential application in business and operational processes; to establish action plans concerning the main challenges, barriers and opportunities; to disseminate Research and Development (R and D) projects in course, new procedures, methods and equipment and to promote integration among forum attendees. The two year-experience in TRANSPETRO's Oil Pipelines and Terminals Unit revealed that technical forums have been an important instrument for cooperative and communicative knowledge management, according to evaluations from 173 attendees. (author)

  8. Technical forums as an instrument for knowledge management in oil pipelines and terminals companies: the experience of TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Maria Fatima Ludovico de [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio/ITUC), Rio de Janeiro, RJ (Brazil). Instituto Tecnologico; Santiago, Adilson; Ribeiro, Kassandra Senra; Arruda, Daniela Mendonca [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper describes the experience of TRANSPETRO's Oil Pipelines and Terminals Unit regarding an institutionalized knowledge management (KM) process of systematically promoting technical forums focused on: pipeline and terminal operations; industrial maintenance; and right-of-way activities management. This empirical work adds evidence that in the model of cooperative and communicative knowledge management it is necessary to motivate staff to provide the company with their tacit knowledge and to take a proactive part in knowledge management processes, particularly in technical forums. Within this KM perspective, technical forums have been held by TRANSPETRO for the following purposes: to discuss the main barriers and challenges the oil pipelines and terminals unit has to face in the coming years; to share and disseminate good practices concerning oil pipeline and terminal activities; to discuss new processes, methods and equipment developments with potential application in business and operational processes; to establish action plans concerning the main challenges, barriers and opportunities; to disseminate Research and Development (R and D) projects in course, new procedures, methods and equipment and to promote integration among forum attendees. The two year-experience in TRANSPETRO's Oil Pipelines and Terminals Unit revealed that technical forums have been an important instrument for cooperative and communicative knowledge management, according to evaluations from 173 attendees. (author)

  9. Technical and Non-Technical Measures for air pollution emission reduction: The integrated assessment of the regional Air Quality Management Plans through the Italian national model

    Science.gov (United States)

    D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.

    2009-12-01

    The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.

  10. Technical and management challenges associated with structural materials degradation in nuclear reactors in the future

    International Nuclear Information System (INIS)

    Ford, F.P.

    2007-01-01

    There are active plans worldwide to increase nuclear power production by significant amounts. In the near term (i.e. by 2020) this will be accomplished by, (a) increasing the power output of the existing reactors and extending their life, and by, (b) constructing new reactors that are very similar to the current water-cooled designs. Beyond 2025-2030, it is possible that new reactors (i.e. the 'GEN IV' designs) will be very different from those currently in service. A full discussion of the technical and management concerns associated with materials degradation that might arise over the next 40 years would need to address a wide range of topics. Quite apart from discussing the structural integrity issues for the materials of construction and the fuel cladding, the debate would also need to cover, for example, fuel resources and the associated issues of fuel cycle management and waste disposal, manufacturing capacity, inspection capabilities, human reliability, etc., since these all impact to one degree or another on the choice of material and the reactor operating conditions. For brevity, the scope of this article is confined to the integrity of the materials of construction for passive components in the current water-cooled reactors and the evolutionary designs (which will dominate the near term new constructions), and the very different GEN IV reactor designs. In all cases the operating environments will be more aggressive than currently encountered. For instance, the concerns for flow accelerated corrosion and flow-induced vibration will be increased under extended power uprate conditions for the current water-cooled reactors. Of greater concern, the design life will be at least 60 years for all of the new reactors and for those current reactors operating with extended licenses. This automatically presents challenges with regard to managing both irradiation damage in metallic and non-metallic materials of construction, and environmentally assisted cracking. This

  11. Generation management using batteries in wind farms: Economical and technical analysis for Spain

    International Nuclear Information System (INIS)

    Dufo-Lopez, Rodolfo; Bernal-Agustin, Jose L.; Dominguez-Navarro, Jose A.

    2009-01-01

    This paper presents an hourly management method for energy generated in grid-connected wind farms using battery storage (Wind-Batteries systems). The method proposed is analysed technically and economically. Electricity generation in wind farms does not usually coincide with the electrical demand curve. If the wind-power penetration becomes high in the Spanish electrical grid, energy management will become necessary for some wind farms. A method is proposed in this paper to adjust the generation curve to the demand curve by storing electrical energy in batteries during off-peak hours (low demand) and selling stored energy to the grid during peak hours (high demand). With the results obtained and reported in this paper, for a Wind-Batteries system to be economically as profitable as a Wind-Only system, the selling price of the energy provided by the batteries during peak hours should be between 22 and 66 c Euro /kWh, depending on the technology and cost of the batteries. Comparison with flexible thermal generation has been performed. Additionally, the results are compared with those obtained if using hydrogen (Wind-Hydrogen system, which uses an electrolyser, hydrogen tank, and fuel cell instead of batteries), concluding that the Wind-Batteries system is both economically and energetically far more suitable

  12. Technical Note: Seasonality in alpine water resources management - a regional assessment

    Science.gov (United States)

    Vanham, D.; Fleischhacker, E.; Rauch, W.

    2008-01-01

    Alpine regions are particularly affected by seasonal variations in water demand and water availability. Especially the winter period is critical from an operational point of view, as being characterised by high water demands due to tourism and low water availability due to the temporal storage of precipitation as snow and ice. The clear definition of summer and winter periods is thus an essential prerequisite for water resource management in alpine regions. This paper presents a GIS-based multi criteria method to determine the winter season. A snow cover duration dataset serves as basis for this analysis. Different water demand stakeholders, the alpine hydrology and the present day water supply infrastructure are taken into account. Technical snow-making and (winter) tourism were identified as the two major seasonal water demand stakeholders in the study area, which is the Kitzbueheler region in the Austrian Alps. Based upon different geographical datasets winter was defined as the period from December to March, and summer as the period from April to November. By determining potential regional water balance deficits or surpluses in the present day situation and in future, important management decisions such as water storage and allocation can be made and transposed to the local level.

  13. Value of information in natural resource management: technical developments and application to pink-footed geese

    Science.gov (United States)

    Williams, Byron K.; Johnson, Fred A.

    2015-01-01

    The “value of information” (VOI) is a generic term for the increase in value resulting from better information to guide management, or alternatively, the value foregone under uncertainty about the impacts of management (Yokota and Thompson, Medical Decision Making 2004;24: 287). The value of information can be characterized in terms of several metrics, including the expected value of perfect information and the expected value of partial information. We extend the technical framework for the value of information by further developing the relationship between value metrics for partial and perfect information and describing patterns of their performance. We use two different expressions for the expected value of partial information to highlight its relationship to the expected value of perfect information. We also develop the expected value of partial information for hierarchical uncertainties. We highlight patterns in the value of information for the Svalbard population of the pink-footed goose (Anser brachyrhynchus), a population that is subject to uncertainty in both reproduction and survival functions. The framework for valuing information is seen as having widespread potential in resource decision making, and serves as a motivation for resource monitoring, assessment, and collaboration.

  14. Exploring the Mismatch between Skills and Jobs for Women in Saudi Arabia in Technical and Vocational Areas: The Views of Saudi Arabian Private Sector Business Managers.

    Science.gov (United States)

    Calvert, John R.; Al-Shetaiwi, A. S.

    2002-01-01

    Gives an overview of women in both general and technical-vocational education and employment in Saudi Arabia. Reports on a survey of 220 private business managers: 83% indicated that Saudi women had limited participation in technical jobs; 63% suggested that vocational-technical education did not promote women's participation. (Contains 51…

  15. Scalable data management, analysis and visualization (SDAV) Institute. Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Geveci, Berk [Kitware, Inc., Clifton Park, NY (United States)

    2017-03-28

    The purpose of the SDAV institute is to provide tools and expertise in scientific data management, analysis, and visualization to DOE’s application scientists. Our goal is to actively work with application teams to assist them in achieving breakthrough science, and to provide technical solutions in the data management, analysis, and visualization regimes that are broadly used by the computational science community. Over the last 5 years members of our institute worked directly with application scientists and DOE leadership-class facilities to assist them by applying the best tools and technologies at our disposal. We also enhanced our tools based on input from scientists on their needs. Many of the applications we have been working with are based on connections with scientists established in previous years. However, we contacted additional scientists though our outreach activities, as well as engaging application teams running on leading DOE computing systems. Our approach is to employ an evolutionary development and deployment process: first considering the application of existing tools, followed by the customization necessary for each particular application, and then the deployment in real frameworks and infrastructures. The institute is organized into three areas, each with area leaders, who keep track of progress, engagement of application scientists, and results. The areas are: (1) Data Management, (2) Data Analysis, and (3) Visualization. Kitware has been involved in the Visualization area. This report covers Kitware’s contributions over the last 5 years (February 2012 – February 2017). For details on the work performed by the SDAV institute as a whole, please see the SDAV final report.

  16. Improving curriculum development practices in a technical vocational community college: examining effects of a professional development arrangement for middle managers

    NARCIS (Netherlands)

    Albashiry, Nabeel; Voogt, Joke; Pieters, Julius Marie

    2015-01-01

    Learning about curriculum development is critical for middle managers of technical vocational institutions in order to assume curriculum leadership in maintaining and enhancing the quality and relevance of their educational programs. This case study reports on the design and effects of a

  17. A VIRTUAL TECHNICAL SYSTEMS AUDIT OF RESEARCH QUALITY ASSURANCE AND RECORD MANAGEMENT SYSTEMS IN ORD, U.S EPA

    Science.gov (United States)

    NHEERL conducts technical systems audits (TSAs) on its research projects. The findings are reported by the QA Manager (QAM) to the Director of QA (DQA) as Exemplary Findings (things the QA Team liked); Corrective Actions (things that must be corrected immediately); and Areas for...

  18. Technical database and management system (DBMS) for the UMTRA project processing sites

    International Nuclear Information System (INIS)

    Hillman, R.L.; Mohr, D.E.

    1985-01-01

    The technical DBMS is a structured and organized method for collecting, storing, retrieving, and analyzing technical data based upon standard operating procedures and quality control measures. The automated environment created by this design exists both as a repository for processing site technical data and the analysis techniques used against this data for site characterization, evaluation, and design. The system is composed of diverse technical subjects that are collectively used to address remedial action problems associated with mill tailings disposal. These technical subjects include hydrology, geology, geochemistry, radiology, and engineering

  19. 14 CFR 11.23 - Does FAA follow the same procedures in issuing all types of rules?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Does FAA follow the same procedures in... § 11.23 Does FAA follow the same procedures in issuing all types of rules? Yes, in general, FAA follows the same procedures for all rule types. There are some differences as to which FAA official has...

  20. 14 CFR 193.7 - What does it mean for the FAA to designate information as protected?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false What does it mean for the FAA to designate... INFORMATION § 193.7 What does it mean for the FAA to designate information as protected? (a) General. When the FAA issues an order designating information as protected under this part, the FAA does not disclose...

  1. 41 CFR 102-75.405 - What responsibilities does the Federal Aviation Administration (FAA) have after receiving a copy...

    Science.gov (United States)

    2010-07-01

    ... does the Federal Aviation Administration (FAA) have after receiving a copy of the notice (and a copy of... responsibilities does the Federal Aviation Administration (FAA) have after receiving a copy of the notice (and a..., the FAA must inform the disposal agency of its determination. Then, the FAA must provide assistance to...

  2. 14 CFR 11.29 - May FAA change its regulations without first issuing an ANPRM or NPRM?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false May FAA change its regulations without... General § 11.29 May FAA change its regulations without first issuing an ANPRM or NPRM? The FAA normally adds or changes a regulation by issuing a final rule after an NPRM. However, FAA may adopt, amend, or...

  3. Technical Reference Suite Addressing Challenges of Providing Assurance for Fault Management Architectural Design

    Science.gov (United States)

    Fitz, Rhonda; Whitman, Gerek

    2016-01-01

    Research into complexities of software systems Fault Management (FM) and how architectural design decisions affect safety, preservation of assets, and maintenance of desired system functionality has coalesced into a technical reference (TR) suite that advances the provision of safety and mission assurance. The NASA Independent Verification and Validation (IV&V) Program, with Software Assurance Research Program support, extracted FM architectures across the IV&V portfolio to evaluate robustness, assess visibility for validation and test, and define software assurance methods applied to the architectures and designs. This investigation spanned IV&V projects with seven different primary developers, a wide range of sizes and complexities, and encompassed Deep Space Robotic, Human Spaceflight, and Earth Orbiter mission FM architectures. The initiative continues with an expansion of the TR suite to include Launch Vehicles, adding the benefit of investigating differences intrinsic to model-based FM architectures and insight into complexities of FM within an Agile software development environment, in order to improve awareness of how nontraditional processes affect FM architectural design and system health management. The identification of particular FM architectures, visibility, and associated IV&V techniques provides a TR suite that enables greater assurance that critical software systems will adequately protect against faults and respond to adverse conditions. Additionally, the role FM has with regard to strengthened security requirements, with potential to advance overall asset protection of flight software systems, is being addressed with the development of an adverse conditions database encompassing flight software vulnerabilities. Capitalizing on the established framework, this TR suite provides assurance capability for a variety of FM architectures and varied development approaches. Research results are being disseminated across NASA, other agencies, and the

  4. Management of radioactive waste at the Oak Ridge National Laboratory: a technical review

    International Nuclear Information System (INIS)

    1985-01-01

    This review was performed for the US Department of Energy by a panel of the Board on Radioactive Waste Management under the National Research Council's Commission on Physical Sciences, Mathematics, and Resources. In summary, ORNL's waste management practices have kept offsite doses low; some of the practices are temporary and improvised - they may not be as satisfactory in the future; reducing anticipated future releases will be difficult because the limited number of candidate waste disposal locations are characterized by topographic peculiarities; and a major ORNL accomplishment has been the demonstration that hydrofracture can be a successful method of disposal for at least low- and intermediate-level waste. The panel obtained its information over a 2-year period by examining a large body of technical literature, by making six visits to the Oak Ridge National Laboratory, and through briefings by representatives of government agencies and their subcontractors. Chapter 2 contains the charge to the panel. Chapters 3, 4, and 5 describe the site, the waste that is present, and the methods used to handle it. Chapters 6 through 10 treat the manner in which the performance of the waste-handling system is monitored, the criteria against which performance is assessed, the panel's assessment of performance, and consideration of alternative methods for future handling of radioactive waste. Chapter 11 contains a brief comparison of ORNL with other sites. The panel's principal conclusions and recommendations are summarized below and treated in detail in subsequent chapters. In general, the conclusions and recommendations considered by the panel to be the most important are provided first. 123 refs., 30 figs., 24 tabs

  5. Participant Assessments of Aviation Safety Inspector Training for Technically Advanced Aircraft

    National Research Council Canada - National Science Library

    Chidester, Thomas; Hackworth, Carla; Knecht, William

    2007-01-01

    .... Currently, Federal Aviation Administration (FAA) aviation safety inspectors are required to inspect technically advanced aircraft, check certified flight instructors, and conduct surveillance of designated pilot examiners who are certifying pilots...

  6. A survey on the effects of knowledge management on organizational learning: A case study of technical and vocational training organization

    Directory of Open Access Journals (Sweden)

    Naser Azad

    2014-04-01

    Full Text Available This paper presents an empirical investigation to study the effects of knowledge management on organizational learning. The study is held in headquarter of technical and vocational training organization in city of Tehran, Iran. The proposed study measures the effects of concept of management, management, knowledge tools, measurement, change management and knowledge content on organizational learning. The study designs a questionnaire in Likert scale and selects a sample of 313 people randomly from 1680 people who work for this organization in city of Tehran, Iran. Using structural equation modeling, the study has detected a positive and meaningful relationship with knowledge management on organizational learning. In our survey, knowledge content is the most important factor followed by change management.

  7. The 'wayfinding' experience of family carers who learn to manage technical health procedures at home: a grounded theory study.

    Science.gov (United States)

    McDonald, Janet; McKinlay, Eileen; Keeling, Sally; Levack, William

    2017-12-01

    With more care taking place in the home, family carers play an important role in supporting patients. Some family carers undertake technical health procedures generally managed by health professionals in hospital settings (e.g. managing a tracheostomy or enteral feeding). To explore how family carers learn to manage technical health procedures in order to help health professionals better understand and support this process. A grounded theory study using data from interviews with 26 New Zealand family carers who managed technical health procedures including nasogastric or gastrostomy feeding, stoma care, urinary catheterisation, tracheostomy management, intravenous therapy, diabetes management and complex wound dressings. Most (20 participants) were caring for their child and the remaining six for their spouse, parent or grandparent. Following grounded theory methods, each interview was coded soon after completion. Additional data were compared with existing material, and as analysis proceeded, initial codes were grouped into higher order concepts until a core concept was developed. Interviewing continued until no new ideas emerged and concepts were well defined. The core concept of 'wayfinding' indicates that the learning process for family carers is active, individualised and multi-influenced, developing over time as a response to lived experience. Health professional support was concentrated on the initial phase of carers' training, reducing and becoming more reactive as carers took responsibility for day-to-day management. Wayfinding involves self-navigation by carers, in contrast to patient navigator models which provide continuing professional assistance to patients receiving cancer or chronic care services. Wayfinding by carers raises questions about how carers should be best supported in their initial and ongoing learning as the management of these procedures changes over time. © 2017 Nordic College of Caring Science.

  8. Platform development for merging various information sources for water management: methodological, technical and operational aspects

    Science.gov (United States)

    Galvao, Diogo

    2013-04-01

    As a result of various economic, social and environmental factors, we can all experience the increase in importance of water resources at a global scale. As a consequence, we can also notice the increasing need of methods and systems capable of efficiently managing and combining the rich and heterogeneous data available that concerns, directly or indirectly, these water resources, such as in-situ monitoring station data, Earth Observation images and measurements, Meteorological modeling forecasts and Hydrological modeling. Under the scope of the MyWater project, we developed a water management system capable of satisfying just such needs, under a flexible platform capable of accommodating future challenges, not only in terms of sources of data but also on applicable models to extract information from it. From a methodological point of view, the MyWater platform obtains data from distinct sources, and in distinct formats, be they Satellite images or meteorological model forecasts, transforms and combines them in ways that allow them to be fed to a variety of hydrological models (such as MOHID Land, SIMGRO, etc…), which themselves can also be combined, using such approaches as those advocated by the OpenMI standard, to extract information in an automated and time efficient manner. Such an approach brings its own deal of challenges, and further research was developed under this project on the best ways to combine such data and on novel approaches to hydrological modeling (like the PriceXD model). From a technical point of view, the MyWater platform is structured according to a classical SOA architecture, with a flexible object oriented modular backend service responsible for all the model process management and data treatment, while the information extracted can be interacted with using a variety of frontends, from a web portal, including also a desktop client, down to mobile phone and tablet applications. From an operational point of view, a user can not only see

  9. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  10. Summary of technical information and agreements from Nuclear Management and Resources Council industry reports addressing license renewal

    International Nuclear Information System (INIS)

    Regan, C.; Lee, S.

    1996-10-01

    In about 1990, the Nuclear Management and Resources Council (NUMARC) submitted for NRC review ten industry reports (IRs) addressing aging issues associated with specific structures and components of nuclear power plants ad one IR addressing the screening methodology for integrated plant assessment. The NRC staff had been reviewing the ten NUMARC IRs; their comments on each IR and NUMARC responses to the comments have been compiled as public documents. This report provides a brief summary of the technical information and NUMARC/NRC agreements from the ten IRs, except for the Cable License Renewal IR. The technical information and agreements documented herein represent the status of the NRC staffs review when the NRC staff and industry resources were redirected to address rule implementation issues. The NRC staff plans to incorporate appropriate technical information and agreements into the draft standard review plan for license renewal

  11. Technical Advisory Committee on the nuclear fuel waste management program : thirteenth annual report

    International Nuclear Information System (INIS)

    Shemilt, L.W.

    1993-03-01

    Since the last reporting period by the Technical Advisory Committee (TAC) the emphasis of the work in the Canadian Nuclear Fuel Waste Management Program (CNFWMP) has been on the writing of the Environmental Impact Statement (EIS) and the associated set of nine primary reference documents as well as supporting documents. These are in preparation for submission to the Environmental Assessment Review Panel who will lead the national evaluation of the disposal concept under the auspices of the Federal Environmental Assessment Review Office (FEARO). The disposal concept developed over the last fourteen years by Atomic Energy of Canada Limited (AECL) and anticipated to be presented by means of the EIS in 1994, is based on a multiple system of natural and man-made barriers wherein nuclear waste is first enclosed in corrosion-resistant containers, designed to last at least 500 years, and then placed in a vault excavated 500 - 1000 m deep in granitic rocks of the Canadian Shield. After container emplacement either in or on the floor of the vault, and with a surrounding buffer material of a bentonite clay/sand mixture, the vault will be backfilled and sealed with crushed rock, buffer and sand, as will be the shafts and exploratory boreholes. The case study being presented by AECL to demonstrate the safety of this concept and the technology to implement it, relies on computer simulations of a hypothetical disposal site with geological characteristics similar to those at the Underground Research Laboratory (URL) in the Whiteshell Research Area (WRA) located in Manitoba. The preliminary simulation results suggest that safe containment can be achieved provided that the waste is surrounded by a sparsely-fractured zone of rock wherein movement of contaminants carried by groundwater is modelled as a diffusive as opposed to a advective process. The principal focus of work during the past year within the environmental and safety assessment has been to complete the Post

  12. Strategic Management for Competitive Advantage: A Case Study of Higher Technical and Vocational Education in Taiwan

    Science.gov (United States)

    Huang, Hsun-I; Lee, Cheng-Fei

    2012-01-01

    Higher technical and vocational education institutions in Taiwan face the pressure of an oversupply of student places and fierce competition from domestic and international institutions. To cope with these challenges, higher technical and vocational education institutions that are better equipped to respond to market requirements are expected to…

  13. Current status of Joint FAA/NASA Runway Friction Program

    Science.gov (United States)

    Yager, Thomas J.; Vogler, William A.

    1989-01-01

    Tests with specially instrumented NASA B-737 and FAA B-727 aircraft together with several different ground friction measuring devices have been conducted for a variety of runway surface types and wetness conditions. This effort is part of the Joint FAA/NASA Aircraft Ground Vehicle Runway Friction Program aimed at obaining a better understanding of aircraft ground handling performance under adverse weather conditions and defining relationships between aircraft and ground vehicle tire friction measurements. Aircraft braking performance on dry, wet, snow-, and ice-covered runway conditions is discussed together with ground vehicle friction data obtained under similar runway conditions. For the wet, compacted snow- and ice-covered runway conditions, the relationship between ground vehicles and aircraft friction data is identified. The influence of major test parameters on friction measurements such as speed, test tire characteristics, and surface contaminant type are discussed. The test results indicate that use of properly maintained and calibrated ground vehicles for monitoring runway friction conditions should be encouraged particularly under adverse weather conditions. The current status of the runway friction program is summarized and future test plans are identified.

  14. FAA/NASA Joint University Program for Air Transportation Research, 1992-1993

    Science.gov (United States)

    Morrell, Frederick R. (Compiler)

    1994-01-01

    The research conducted during the academic year 1992-1993 under the FAA/NASA sponsored Joint University Program for Air Transportation Research is summarized. The year end review was held at Ohio University, Athens, Ohio, 17-18 June 1993. The Joint University Program is a coordinated set of three grants sponsored by the Federal Aviation Administration and NASA Langley Research Center, one each with the Massachusetts Institute of Technology, Ohio University, and Princeton University. Completed works, status reports, and annotated bibliographies are presented for research topics, which include navigation, guidance, and control theory and practice, aircraft performance, human factors and air traffic management. An overview of the year's activities for each university is also presented.

  15. Precision Departure Release Capability (PDRC) Overview and Results: NASA to FAA Research Transition

    Science.gov (United States)

    Engelland, Shawn; Davis, Tom.

    2013-01-01

    NASA researchers developed the Precision Departure Release Capability (PDRC) concept to improve the tactical departure scheduling process. The PDRC system is comprised of: 1) a surface automation system that computes ready time predictions and departure runway assignments, 2) an en route scheduling automation tool that uses this information to estimate ascent trajectories to the merge point and computes release times and, 3) an interface that provides two-way communication between the two systems. To minimize technology transfer issues and facilitate its adoption by TMCs and Frontline Managers (FLM), NASA developed the PDRC prototype using the Surface Decision Support System (SDSS) for the Tower surface automation tool, a research version of the FAA TMA (RTMA) for en route automation tool and a digital interface between the two DSTs to facilitate coordination.

  16. Experiences in the management of technical competencies and suitability of qualified experts

    International Nuclear Information System (INIS)

    Smith, David M.

    2008-01-01

    The UK Defence Science and Technology Laboratory (Dstl) RPA Body was established to provide radiation protection advice to the UK Ministry of Defence and other UK Government organisations. It consists of around 20 individually certificated Qualified Experts (known as Radiation Protection Advisers (RPA) in the terminology of UK legislation) 15 health physicists (HP), and other support staff. The RPA Body operates to procedures that satisfy the requirements of the UK Heath and Safety Executive (HSE) (the primary regulator in the UK for radiation protection legislation) and as such is recognised by the HSE as an RPA Body. Individual RPAs, HPs and support staff are only appointed to the RPA Body when they are deemed suitable and can satisfy the various general and specific operational roles within the Body. The criteria and procedures for establishing suitability of a candidate to a role are described. In addition to the basic underpinning knowledge for RPAs (the equivalent of the 'qualified expert' defined in Article 1 of the Basic Safety Standards Directive 96/29/EURATOM, candidates for appointment to the RPA Body are required to demonstrate competence and suitability in specialist areas as determined by the business needs of Dstl RPA Body. The criteria and assessment processes are described. The technical management of the RPA Body is illustrated, stressing the importance of the selection and allocation of suitable individuals to specific tasks, using a competency matrix. Experience to date with the RPA Body processes has been very positive; the arrangements are sufficiently flexible such as to accommodate the changing legislative requirements and the business needs of the RPA Body. There are many additional benefits arising to Dstl and its customers as a result of operation as an RPA Body. (author)

  17. ANL technical support program for DOE Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Bates, J.K.; Bradley, C.R.; Buck, E.C.; Cunnane, J.C.; Dietz, N.L.; Ebert, W.L.; Emery, J.W.; Feng, X.; Gerding, T.J.; Gong, M.; Hoh, J.C.; Mazer, J.J.; Wronkiewicz, D.J.; Bourcier, W.L.; Morgan, L.E.; Newton, L.; Nielsen, J.K.; Phillips, B.L.; Ewing, R.C.; Wang, L.; Li, H.; Tomozawa, M.

    1993-05-01

    A program was established for DOE Environmental Restoration and Waste Management (EM) to evaluate factors that are anticipated to affect waste glass reaction during repository disposal, especially in an unsaturated environment typical of what may be expected for the proposed Yucca Mountain repository site. This report covers progress in FY 1992 on the following tasks: 1. A compendium of the characteristics of high-level nuclear waste borosilicate glass has been written. 2. A critical review of important parameters that affect the reactivity of glass in an unsaturated environment is being prepared. 3. A series of tests has been started to evaluate the reactivity of fully radioactive glasses in a high-level waste repository environment and compare it to the reactivity of synthetic, nonradioactive glasses of similar composition. 4. The effect of radiation upon the durability of waste glasses at a high glass surface area-to-liquid volume (SA/V) ratio and a high gas-to-liquid volume ratio will be assessed. These tests address both vapor and high SA/V liquid conditions. 5. A series of tests is being performed to compare the extent of reaction of nuclear waste glasses at various SAN ratios. Such differences in the SAN ratio may significantly affect glass durability. 6. A series of natural analogue tests is being analyzed to demonstrate a meaningful relationship between experimental and natural alteration conditions. 7. Analytical electron microscopy (AEM), infrared spectroscopys and nuclear resonant profiling are being used to assess the glass/water reaction pathway by identifying intermediate phases that appear on the reacting glass. Additionally, colloids from the leach solutions are being studied using AEM. 8. A technical review of AEM results is being provided. 9. A study of water diffusion involving nuclear waste glasses is being performed. 10. A mechanistically based model is being developed to predict the performance of glass over repository-relevant time periods

  18. Independent technical evaluation and recommendations for contaminated groundwater at the department of energy office of legacy management Riverton processing site

    Energy Technology Data Exchange (ETDEWEB)

    Looney, Brain B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Denham, Miles E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Eddy-Dilek, Carol A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2014-04-01

    The U.S. Department of Energy Office of Legacy Management (DOE-LM) manages the legacy contamination at the Riverton, WY, Processing Site – a former uranium milling site that operated from 1958 to 1963. The tailings and associated materials were removed in 1988-1989 and contaminants are currently flushing from the groundwater. DOE-LM commissioned an independent technical team to assess the status of the contaminant flushing, identify any issues or opportunities for DOE-LM, and provide key recommendations. The team applied a range of technical frameworks – spatial, temporal, hydrological and geochemical – in performing the evaluation. In each topic area, an in depth evaluation was performed using DOE-LM site data (e.g., chemical measurements in groundwater, surface water and soil, water levels, and historical records) along with information collected during the December 2013 site visit (e.g., plant type survey, geomorphology, and minerals that were observed, collected and evaluated).

  19. Risk perception of various technical options in the field of radioactive waste management

    International Nuclear Information System (INIS)

    Cameron, F.X.

    1996-01-01

    The author's group had a wide ranging discussion of risk and, at the very end of the discussion got to the question that was posed to them, which is that of risk perception of various technical options in the field of radioactive waste management. Some of the points that were made in this discussion is a reality that the group, as decision-makers, have to deal with, and it has to be treated as a reality. Secondly, the scientist looks at risk from the classic definition of ''probability times consequences'', but the public only looks at the consequences side of the equation, and too often the probability of something happening is treated as a probability of one that it will actually happen. A third problem that was identified in this area is that often the efforts to make the disposal of waste safer may contribute, in the public mind, to the fact that the risk is even more hazardous. And the last problem is that people do not trust what a decision maker is saying when he talks about the fact that there is little probability of something happening. The group then went on to a discussion of how he should try to treat risk perception. One point that was made is that voluntary acceptance of a risk is important. A second point that was made on how to deal with risk perception problems is that the group could try to put the risk of radioactive waste disposal in the perspective of other risks to society, from the chemical industry for instance. The group also talked about the possibility of putting the benefits in perspective for people. Another point was that the group should have different communications strategies for different audiences. But, the more the public is involved in the decision making process, the more comfortable they are going to be with the risk, and the more consistent the perception of risk may be with the scientific definition thereof. In terms of new technologies, new innovations on the generation and management of waste, although these may actually

  20. Technical Review of Law Enforcement Standards and Guides Relative to Incident Management

    Energy Technology Data Exchange (ETDEWEB)

    Stenner, Robert D.; Salter, R.; Stanton, J. R.; Fisher, D.

    2009-03-24

    In an effort to locate potential law enforcement-related standards that support incident management, a team from the Pacific Northwest National Laboratory (PNNL) contacted representatives from the National Institute of Standards-Office of Law Enforcement Standards (NIST-OLES), National Institute of Justice (NIJ), Federal Bureau of Investigation (FBI), Secret Service, ASTM International committees that have a law enforcement focus, and a variety of individuals from local and regional law enforcement organizations. Discussions were held with various state and local law enforcement organizations. The NIJ has published several specific equipment-related law enforcement standards that were included in the review, but it appears that law enforcement program and process-type standards are developed principally by organizations that operate at the state and local level. Input is provided from state regulations and codes and from external non-government organizations (NGOs) that provide national standards. The standards that are adopted from external organizations or developed independently by state authorities are available for use by local law enforcement agencies on a voluntary basis. The extent to which they are used depends on the respective jurisdictions involved. In some instances, use of state and local disseminated standards is mandatory, but in most cases, use is voluntary. Usually, the extent to which these standards are used appears to depend on whether or not jurisdictions receive certification from a “governing” entity due to their use and compliance with the standards. In some cases, these certification-based standards are used in principal but without certification or other compliance monitoring. In general, these standards appear to be routinely used for qualification, selection for employment, and training. In these standards, the term “Peace Officer” is frequently used to refer to law enforcement personnel. This technical review of national law

  1. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Garth M. [Bechtel National Inc., 2435 Stevens Center Place, Richland, Washington, 99352 (United States); Saunders, Scott A. [Washington River Protection Solutions, P.O. Box 850, Richland, Washington, 99352 (United States)

    2013-07-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation

  2. Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

    International Nuclear Information System (INIS)

    Duncan, Garth M.; Saunders, Scott A.

    2013-01-01

    The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation

  3. INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

    Energy Technology Data Exchange (ETDEWEB)

    Abitz, R.; Jackson, D.; Eddy-Dilek, C.

    2011-06-27

    The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

  4. Curriculum Management Practices in Pedagogical Coordinations of Araucania Schools: Unveiling Technical/Instrumental Rationality, Control and Power Mechanisms Underlying

    Directory of Open Access Journals (Sweden)

    Juan Carlos Beltrán-Véliz

    2016-01-01

    Full Text Available This article consists of a case study regarding curriculum management practices of pedagogical coordinators in schools in Araucania area. The study aims to reveal technical/instrumental rationality, control and power mechanisms that underlie the curriculum management practices of such pedagogical coordinators of schools in Araucania region. A descriptive qualitative design based on the constructionist grounded theory and the constant comparative method is considered. Subjects studied included 12 technical leaders and 22 teachers from Araucania schools. Techniques for collecting information were semi-structured interview and texts for reading. Four categories rose from axial coding. Findings reveal that the teaching process is reduced to an instructional process. Furthermore, there is no uniformity of criteria regarding general functions that must be met. In the same extent, activity coordination is centered on bureaucratic administrative aspects, with main focus on task control. Regulations, programs and educational projects are used as control mechanisms. In addition, absence of spaces for professional discussion of pedagogical work and for constructive criticism is envisioned. This study concludes that pedagogical coordination practices are geared from an “instrumental rationality”, anchored in technical management set up in control and power.

  5. Vision and framework for technical and management support to facilitate foreign spent fuel storage and geologic disposal in Russia

    International Nuclear Information System (INIS)

    Halsey, W.G.; Jardine, L.J.; Smith, C.F.

    1999-01-01

    This 'Technical and Management Support' program would facilitate the transfer of spent fuel from commercial power plants in Taiwan to a storage and geologic repository site near Krasnoyarsk, Russia. This program resolves issues of disposition of Taiwan spent fuel (including US origin fuel) and provides revenue for Russia to develop an integrated spent fuel storage and radioactive waste management system including a geologic repository. LLNL has ongoing contracts and collaborations with all the principal parties and is uniquely positioned to facilitate the development of such a program. A three-phase approach over 20 years is proposed: namely, an initial feasibility investigation followed by an engineering development phase, and then implementation

  6. TECHNICAL GUIDANCE DOCUMENT: CONSTRUCTION QUALITY MANAGEMENT FOR REMEDIAL ACTION AND REMEDIAL DESIGN WASTE CONTAINMENT SYSTEMS

    Science.gov (United States)

    This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...

  7. Benefit Analysis Report, United States Air Force Technical Order Management Systems (AFTOMS)

    Science.gov (United States)

    1989-08-01

    This report prepared by the Transportation Systems Center (TSC) concludes an analysis of the Technical Order (TO) costs and benefits, which was originally undertaken as part of the US Air Force Computer-aided Acquisition and Logistics Support (CALS) ...

  8. The Importance of Detail and Organization of Technical Drawings for the Project Management

    Directory of Open Access Journals (Sweden)

    Diego de Avila

    2015-11-01

    Full Text Available This research takes into account the process of technical improvement through the development and interpretation of technical drawing with the appropriate software. However, it’s known that the technical design, no longer being new in business, tends to effect the production process in a clear and objective way, but there is a concern for the training and use of this standardized form tool. This article presents a case study detailing the use of standardized technical drawing by CAD system and continuously. Seeking to meet the improvement of quality control, production flexibility, reduced costs, documentation and even security, in a company in the northern region of the State of Rio Grande do Sul.

  9. BizWatts: A modular socio-technical energy management system for empowering commercial building occupants to conserve energy

    International Nuclear Information System (INIS)

    Gulbinas, R.; Jain, R.K.; Taylor, J.E.

    2014-01-01

    Highlights: • We developed a socio-technical commercial building energy management system. • It was designed for directly engaging and connecting building occupants via feedback. • We collected an array of clickstream data for internal design validation. • A pilot study validated its ability to drive energy savings in commercial buildings. - Abstract: Commercial buildings represent a significant portion of energy consumption and environmental emissions worldwide. To help mitigate the environmental impact of building operations, building energy management systems and behavior-based campaigns designed to reduce energy consumption are becoming increasingly popular. In this paper, we describe the development of a modular socio-technical energy management system, BizWatts, which combines the two approaches by providing real-time, appliance-level power management and socially contextualized energy consumption feedback. We describe in detail the physical and virtual architecture of the system, which simultaneously engages building occupants and facility managers, as well as the main principles behind the interface design and component functionalities. A discussion about how the data collection capabilities of the system enable insightful commercial building energy efficiency studies and quantitative network analysis is also included. We conclude by commenting on the validation of the system, identifying current system limitations and introducing new research avenues that the development and deployment of BizWatts enables

  10. Technical Network

    CERN Multimedia

    2007-01-01

    In order to optimize the management of the Technical Network (TN), to ease the understanding and purpose of devices connected to the TN, and to improve security incident handling, the Technical Network Administrators and the CNIC WG have asked IT/CS to verify the "description" and "tag" fields of devices connected to the TN. Therefore, persons responsible for systems connected to the TN will receive email notifications from IT/CS asking them to add the corresponding information in the network database. Thank you very much for your cooperation. The Technical Network Administrators & the CNIC WG

  11. Technical Network

    CERN Multimedia

    2007-01-01

    In order to optimise the management of the Technical Network (TN), to facilitate understanding of the purpose of devices connected to the TN and to improve security incident handling, the Technical Network Administrators and the CNIC WG have asked IT/CS to verify the "description" and "tag" fields of devices connected to the TN. Therefore, persons responsible for systems connected to the TN will receive e-mails from IT/CS asking them to add the corresponding information in the network database at "network-cern-ch". Thank you very much for your cooperation. The Technical Network Administrators & the CNIC WG

  12. NASA/FAA experiments concerning helicopter IFR airworthiness criteria

    Science.gov (United States)

    Lebacqz, J. V.

    1983-01-01

    A sequence of ground and flight simulation experiments was conducted as part of a joint NASA/FAA program to investigate helicopter instrument flight rules (IFR) airworthiness criteria. The first six of these experiments are described and the results summarized. Five of the experiments were conducted on large amplitude motion base simulators; V/STOLAND UH-1H variable stability helicopter was used in the flight experiment. Airworthiness implications of selected variables that were investigated across all of the experiments are discussed, including the level of longitudinal static stability, the type of stability and control augmentation, the addition of flight director displays, and the type of instrument approach task. Among the specific results reviewed are the adequacy of neutral longitudinal statics for dual pilot approaches and the requirement for pitch and roll attitude stabilization in the stability and control augmentation system to achieve flying qualities evaluated as satisfactory.

  13. 14 CFR Appendix A to Part 415 - FAA/USSPACECOM Launch Notification Form

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false FAA/USSPACECOM Launch Notification Form A Appendix A to Part 415 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Pt. 415, App. A Appendix A to Part 415—FAA...

  14. 47 CFR 17.14 - Certain antenna structures exempt from notification to the FAA.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Certain antenna structures exempt from notification to the FAA. 17.14 Section 17.14 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL... § 17.14 Certain antenna structures exempt from notification to the FAA. A notification to the Federal...

  15. The research project on technical information basis for aging management in Fukui and Kinki area. Final report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Nagayama, Shigeru; Watarumi, Chikae; Toudou, Tsugihiko

    2011-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI) as a five-year program effectively, to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the technical strategy map for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants, 2) The development of inspection techniques to monitor the initiation and propagation of defects, 3) The development of a guideline for evaluating weld repair methods, 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2010, 11 continuing research subjects were proposed for this project and all were accepted. Of these, 5 subjects were related to the first topic (pipe thinning), 4 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  16. Technical Analysis of In-Valley Drainage Management Strategies for the Western San Joaquin Valley, California

    Science.gov (United States)

    Presser, Theresa S.; Schwarzbach, Steven E.

    2008-01-01

    The western San Joaquin Valley is one of the most productive farming areas in the United States, but salt-buildup in soils and shallow groundwater aquifers threatens this area?s productivity. Elevated selenium concentrations in soils and groundwater complicate drainage management and salt disposal. In this document, we evaluate constraints on drainage management and implications of various approaches to management considered in: *the San Luis Drainage Feature Re-Evaluation (SLDFRE) Environmental Impact Statement (EIS) (about 5,000 pages of documentation, including supporting technical reports and appendices); *recent conceptual plans put forward by the San Luis Unit (SLU) contractors (i.e., the SLU Plans) (about 6 pages of documentation); *approaches recommended by the San Joaquin Valley Drainage Program (SJVDP) (1990a); and *other U.S. Geological Survey (USGS) models and analysis relevant to the western San Joaquin Valley. The alternatives developed in the SLDFRE EIS and other recently proposed drainage plans (refer to appendix A for details) differ from the strategies proposed by the San Joaquin Valley Drainage Program (1990a). The Bureau of Reclamation (USBR) in March 2007 signed a record of decision for an in-valley disposal option that would retire 194,000 acres of land, build 1,900 acres of evaporation ponds, and develop a treatment system to remove salt and selenium from drainwater. The recently proposed SLU Plans emphasize pumping drainage to the surface, storing approximately 33% in agricultural water re-use areas, treating selenium through biotechnology, enhancing the evaporation of water to concentrate salt, and identifying ultimate storage facilities for the remaining approximately 67% of waste selenium and salt. The treatment sequence of reuse, reverse osmosis, selenium bio-treatment, and enhanced solar evaporation is unprecedented and untested at the scale needed to meet plan requirements. All drainage management strategies that have been proposed

  17. Effect of simulation training on compliance with difficult airway management algorithms, technical ability, and skills retention for emergency cricothyrotomy.

    Science.gov (United States)

    Hubert, Vincent; Duwat, Antoine; Deransy, Romain; Mahjoub, Yazine; Dupont, Hervé

    2014-04-01

    The effectiveness of simulation is rarely evaluated. The aim of this study was to assess the impact of a short training course on the ability of anesthesiology residents to comply with current difficult airway management guidelines. Twenty-seven third-year anesthesiology residents were assessed on a simulator in a "can't intubate, can't ventilate" scenario before the training (the pretest) and then randomly 3, 6, or 12 months after training (the posttest). The scenario was built so that the resident was prompted to perform a cricothyrotomy. Compliance with airway management guidelines and the cricothyrotomy's duration and technical quality were assessed as a checklist score [0 to 10] and a global rating scale [7 to 35]. After training, all 27 residents (100%) complied with the airway management guidelines, compared with 17 (63%) in the pretest (P training session significantly improved the residents' compliance with guidelines and their performance of cricothyrotomy.

  18. Pau: the building technical management system plays transparency downstream; Pau: la GTB joue la transparence au fil de l'eau

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2000-10-01

    All made of glazing, the new department hotel of Pyrenees-Atlantiques (France) combines a technical management system for the optimization of ambience conditioning and an original concept of heat and coldness production. An abandoned river channel and heat pumps are used for the production of hot and cold water. The energy management system allows to optimize both the energy consumption and the comfort of occupants. Technical details are given. (J.S.)

  19. Final Technical Close out Report University Research Program in Robotics for Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    James S. Tulenko; Carl Crane

    2004-01-01

    The report covers the 2003-04 contract period, with a retrospective of the 11 years for the contract, from 1993 to 2004. This includes personnel, technical publications and reports, plus research laboratories employed. Specific information is given in eight research areas, reporting on all technology developed and/or deployed by the University of Florida

  20. [Change management: An analysis of actors; perceptions about technical assistance in the Democratic Republic of Congo].

    Science.gov (United States)

    Ribesse, Nathalie; Iyeti, Alain; Macq, Jean

    2015-01-01

    Technical assistance (TA) is a common component of health system strengthening interventions. This type of intervention is too often designed and evaluated according to a logic that fails to take into account social complexity. Actors' perceptions are one element of this complexity. This article presents a study conducted in the Democratic Republic of Congo designed to identify perceptions concerning two types of technical support providers for health system strengthening: long-term technical assistants (agents of development agencies) and provincial technical advisors (agents of the Ministry of Health). Interviews were conducted with an innovative tool inspired by the principles of systems thinking. Interviewees were actors involved in a TA intervention in the province of Bandundu. Their expectations regarding TA providers were identified in terms of personal characteristics (knowledge, know-how and interpersonal skills), roles, and styles of interaction for capacity building ("interventionist/ prescriptive axes"). Interviewees emphasized the importance of mutual learning and the quality of interactions, which depends on TA provider's interpersonal skills and mutual willingness. Perceptions of TA provider's characteristics tend to be similar, but several differences were observed concerning the expectations about the roles of TAs, and the style that should be adopted for capacity building. Ignoring these differences in expectations may be a threat to the effectiveness of TA.

  1. A Tanzanian Perspective of the Technical Aspects of IT Service Management Education

    Science.gov (United States)

    Kemppainen, Jyri; Tedre, Matti; Sutinen, Erkki

    2012-01-01

    Information technology (IT) professionals face markedly different kinds of challenges in developing countries from the ones in developed countries. Based on the research literature and our fourteen years of fieldwork in Iringa, Tanzania, we have identified eight groups of technical characteristics of IT work that significantly affect the work of…

  2. The Acyl-CoA synthetases encoded within FAA1 and FAA4 in Saccharomyces cerevisiae function as components of the fatty acid transport system linking import, activation, and intracellular Utilization

    DEFF Research Database (Denmark)

    Færgeman, Nils J.; Black, P N; Zhao, X D

    2001-01-01

    CoA levels were defined following incubation of wild type and mutant cells with limiting concentrations of exogenous oleate. These studies demonstrated oleoyl CoA levels were reduced to less than 10% wild-type levels in faa1 Delta and faa1 Delta faa4 Delta strains. Defects in metabolic utilization...

  3. Commercial vehicle fleet management and information systems. Technical memorandum 2 : summary of case study interviews

    Science.gov (United States)

    1997-10-01

    The FHWA has commissioned the Commercial Vehicle Fleet Management and Information Systems study to determine if there are fleet management needs that the public sector can address through the development of ITS for commercial vehicle operations. As p...

  4. Improving SPAWAR PEO C4I Organizational Alignment to Better Enable Enterprise Technical Risk Management

    Science.gov (United States)

    2017-03-01

    dependency requires cross-system risk management . To this end, DOD, as well as businesses in many other industries, are turning toward enterprise...It does not address enterprise risk management . Enterprise risk management is not a new concept, originating in the mid-1990s in private industry...respective university’s business school, the concept of managing risk at an enterprise, or system-of-systems level is also taking hold in the DOD. To

  5. 14 CFR 11.21 - What are the most common kinds of rulemaking actions for which FAA follows the Administrative...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false What are the most common kinds of rulemaking actions for which FAA follows the Administrative Procedure Act? 11.21 Section 11.21 Aeronautics... actions for which FAA follows the Administrative Procedure Act? FAA follows the Administrative Procedure...

  6. 49 CFR 1540.117 - Threat assessments regarding aliens holding or applying for FAA certificates, ratings, or...

    Science.gov (United States)

    2010-10-01

    ... applying for FAA certificates, ratings, or authorizations. 1540.117 Section 1540.117 Transportation Other... applying for FAA certificates, ratings, or authorizations. (a) Applicability. This section applies when TSA... applying for, an airman certificate, rating, or authorization issued by the FAA Administrator, poses a...

  7. 14 CFR 11.51 - May I request that FAA hold a public meeting on a rulemaking action?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false May I request that FAA hold a public... Meetings and Other Proceedings § 11.51 May I request that FAA hold a public meeting on a rulemaking action? Yes, you may request that we hold a public meeting. FAA holds a public meeting when we need more than...

  8. 14 CFR 11.91 - How does FAA inform me of its decision on my petition for exemption?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false How does FAA inform me of its decision on... for Rulemaking and for Exemption § 11.91 How does FAA inform me of its decision on my petition for exemption? The FAA will notify you in writing about its decision on your petition. A copy of this decision...

  9. 14 CFR 11.27 - Are there other ways FAA collects specific rulemaking recommendations before we issue an NPRM?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Are there other ways FAA collects specific... Rulemaking Procedures General § 11.27 Are there other ways FAA collects specific rulemaking recommendations before we issue an NPRM? Yes, the FAA obtains advice and recommendations from rulemaking advisory...

  10. 14 CFR 406.105 - Separation of functions for prosecuting civil penalties and advising the FAA decisionmaker.

    Science.gov (United States)

    2010-01-01

    ... civil penalties and advising the FAA decisionmaker. 406.105 Section 406.105 Aeronautics and Space... INVESTIGATIONS, ENFORCEMENT, AND ADMINISTRATIVE REVIEW Rules of Practice in FAA Space Transportation Adjudications § 406.105 Separation of functions for prosecuting civil penalties and advising the FAA...

  11. 14 CFR 193.9 - Will the FAA ever disclose information that is designated as protected under this part?

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Will the FAA ever disclose information that... VOLUNTARILY SUBMITTED INFORMATION § 193.9 Will the FAA ever disclose information that is designated as protected under this part? The FAA discloses information that is designated as protected under this part...

  12. 49 CFR 1540.115 - Threat assessments regarding citizens of the United States holding or applying for FAA...

    Science.gov (United States)

    2010-10-01

    ... United States holding or applying for FAA certificates, ratings, or authorizations. 1540.115 Section 1540... of the United States holding or applying for FAA certificates, ratings, or authorizations. (a... the officer next in rank below the Administrator. FAA Administrator means the Administrator of the...

  13. 41 CFR 102-75.415 - What happens after the disposal agency receives the FAA's recommendation for disposal of the...

    Science.gov (United States)

    2010-07-01

    ... disposal agency receives the FAA's recommendation for disposal of the property for a public airport? 102-75... receives the FAA's recommendation for disposal of the property for a public airport? The head of the disposal agency, or his or her designee, may convey property approved by the FAA for use as a public...

  14. 78 FR 33146 - Notice of Proposal Policy for Distribution of FAA Data and Information; Extension of Comment Period

    Science.gov (United States)

    2013-06-03

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration [Docket No. FAA-2013-0392; Notice No.] RIN 2120-AJ61 Notice of Proposal Policy for Distribution of FAA Data and Information; Extension of Comment Period AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice for Data and Information...

  15. Waste management issues and their potential impact on technical specifications of CANDU fuel materials

    Energy Technology Data Exchange (ETDEWEB)

    Tait, J.C.; Johnson, L.H. [Atomic Energy of Canada Limited, Pinawa, Manitoba (Canada)

    1997-07-01

    The technical specifications for the composition of nuclear fuels and materials used in Canada's CANDU reactors have been developed by AECL and materials manufacturers, taking into account considerations specific to their manufacture and the effect of minor impurities on fuel behaviour in reactor. Nitrogen and chlorine are examples of UO{sub 2} impurities, however, where there is no technical specification limit. These impurities are present in the source materials or introduced in the fabrication process and are neutron activated to {sup 14}C and {sup 36}C1, which after {sup 129}I , are the two most significant contributors to dose in safety assessments for the disposal of used fuel. For certain impurities, environmental factors, particularly the safety of the disposal of used fuels, should be taken into consideration when deriving 'allowable' impurity limits for nuclear fuel materials. (author)

  16. Waste management issues and their potential impact on technical specifications of CANDU fuel materials

    International Nuclear Information System (INIS)

    Tait, J.C.; Johnson, L.H.

    1997-01-01

    The technical specifications for the composition of nuclear fuels and materials used in Canada's CANDU reactors have been developed by AECL and materials manufacturers, taking into account considerations specific to their manufacture and the effect of minor impurities on fuel behaviour in reactor. Nitrogen and chlorine are examples of UO 2 impurities, however, where there is no technical specification limit. These impurities are present in the source materials or introduced in the fabrication process and are neutron activated to 14 C and 36 C1, which after 129 I , are the two most significant contributors to dose in safety assessments for the disposal of used fuel. For certain impurities, environmental factors, particularly the safety of the disposal of used fuels, should be taken into consideration when deriving 'allowable' impurity limits for nuclear fuel materials. (author)

  17. Review and comment on the advanced spent fuel management process (1): Technical aspects and non-proliferation concerns

    International Nuclear Information System (INIS)

    Song, Yo Taik

    2001-01-01

    Efforts are made to analyze the project, the Advanced Spent Fuel Management Technology (ASFMT), which is currently carried out at Korea Atomic Energy Research Institute, on the technical feasibility and validity as well as on the nuclear non-proliferation concerns. The project is a part of a program under the 'Long and Midterm Nuclear Development Program'. On the technical analysis, reviewed the papers presented at the national and international meetings on the subject by KAERI staffs, and also participated to various technical discussions on the 'Mock-up Test', currently in progress. On the non-proliferation concerns, the ASFMT project was reviewed and analyzed in reference to various programs currently in progress or in a formulation stages in US, such as the DOE TOPS and ATW. Further reviewed the past JASNEC process and programs for possible application of the ASFMT project for JASNEC project. Provided a few thoughts for effectively carrying out the ASFMT project, and a plan for the next phase is presented

  18. Review and comment on the advanced spent fuel management process (1): Technical aspects and non-proliferation concerns

    Energy Technology Data Exchange (ETDEWEB)

    Song, Yo Taik

    2001-01-01

    Efforts are made to analyze the project, the Advanced Spent Fuel Management Technology (ASFMT), which is currently carried out at Korea Atomic Energy Research Institute, on the technical feasibility and validity as well as on the nuclear non-proliferation concerns. The project is a part of a program under the 'Long and Midterm Nuclear Development Program'. On the technical analysis, reviewed the papers presented at the national and international meetings on the subject by KAERI staffs, and also participated to various technical discussions on the 'Mock-up Test', currently in progress. On the non-proliferation concerns, the ASFMT project was reviewed and analyzed in reference to various programs currently in progress or in a formulation stages in US, such as the DOE TOPS and ATW. Further reviewed the past JASNEC process and programs for possible application of the ASFMT project for JASNEC project. Provided a few thoughts for effectively carrying out the ASFMT project, and a plan for the next phase is presented.

  19. Management of Radioactive Spills in Nuclear Medicine; Teaching and Assessing with Objectively Structured Assessment of Technical Skills

    International Nuclear Information System (INIS)

    Hussain, Riffat Parveen

    2015-01-01

    Routine work in nuclear medicine requires the careful elution of radioactivity and its subsequent, storage and handling. Though all effort is maintained to prevent any “spill” of this radioactivity, accidents are bound to happen. The response to this spill is a methodically worked out a plan that is written and adopted as a “standard operating procedure.” This protocol is taught to all involved in the area of working as a mock drill/apprenticeship model. No formal evaluation of learning is in place except for the mock drills. The objectively structured assessment of technical skills (OSATS) is a variation on the Objective Structured Clinical Examination, which is a form of workplace based assessment. The OSATS is cited in the Accreditation Council of Graduate Medical Education evaluation toolbox on the website as the most desirable evaluation tool for the patient care topics. It is the objective of this paper is to introduce the “OSATS” for teaching, and assessment of the learning, of the protocol for the management of radioactive spill. As a review of the literature on the subject failed to reveal any such teaching protocol/material/document for this important technical skill, we hope that it may act as a landmark for the development of teaching and assessment of other technical skills also

  20. Instrumentation and Controls Division, Technical Support Department Management Plan, FY 1993--FY 1996

    Energy Technology Data Exchange (ETDEWEB)

    Adkisson, B.P.; Kunselman, C.W.; Effler, R.P.; Miller, D.R.; Millet, A.J.; Stansberry, C.T.

    1993-08-01

    This report describes the organization, key functions, and major activities of the Technical Support Department The Department is the programmatic support element of the Instrumentation and Controls Division. The Department`s primary focus is the support of existing equipment and systems at Oak Ridge National Laboratory that are generally characterized as instrumentation and controls. The support takes the form of repair, calibration, fabrication, field engineering, preventive maintenance, software support, and record keeping.

  1. Application of data-processing to the technical and economical management of the plants of Simo

    International Nuclear Information System (INIS)

    Chastagner, F.

    1988-01-01

    The firm Simo is entrusted with the processing of the uranium ores extracted from the mines of Cogema in France, in its three plants. The paper describes the conception and the functioning of the information system. Among the advantages contributed by the system, the coherence between the technical follow-up and the economical follow-up constitutes one of the principal progressive features [fr

  2. Analysis of the U.S. and Soviet Crisis Management Experiences. Technical Report

    Science.gov (United States)

    1987-01-01

    past and present performance. The current limitations on the use of these techniques are in large part technical -- there is no SPSS for the AT community...STOESSINGER, J.G. (1976) Henry Kissinger: The Anguish of Power. New York: Norton. 4-6 " Presidential books and memoirs, " State Department bulletins and...Policy and Third World Nations. Arlington, VA: Center for Naval Analyses, Professional Paper 155. STOESSINGER, J.G. (1976) Henry Kissinger: The Anguish

  3. Fracture Analysis of the FAA/NASA Wide Stiffened Panels

    Science.gov (United States)

    Seshadri, B. R.; Newman, J. C., Jr.; Dawicke, D. S.; Young, R. D.

    1999-01-01

    This paper presents the fracture analyses conducted on the FAA/NASA stiffened and unstiffened panels using the STAGS (STructural Analysis of General Shells) code with the critical crack-tip-opening angle (CTOA) fracture criterion. The STAGS code with the "plane-strain" core option was used in all analyses. Previous analyses of wide, flat panels have shown that the high-constraint conditions around a crack front, like plane strain, has to be modeled in order for the critical CTOA fracture criterion to predict wide panel failures from small laboratory tests. In the present study, the critical CTOA value was determined from a wide (unstiffened) panel with anti-buckling guides. The plane-strain core size was estimated from previous fracture analyses and was equal to about the sheet thickness. Rivet flexibility and stiffener failure was based on methods and criteria, like that currently used in industry. STAGS and the CTOA criterion were used to predict load-against-crack extension for the wide panels with a single crack and multiple-site damage cracking at many adjacent rivet holes. Analyses were able to predict stable crack growth and residual strength within a few percent (5%) of stiffened panel tests results but over predicted the buckling failure load on an unstiffened panel with a single crack by 10%.

  4. Sweden; Financial Sector Assessment Program Update: Technical Note on Contingency Planning, Crisis Management and Bank Resolution

    OpenAIRE

    International Monetary Fund

    2011-01-01

    This abstract reviews the recommendations made in the FSAP Update for Sweden in the areas of contingency planning, crisis management, and bank resolution. Although Sweden crisis management fared well during the global financial crisis, its authorities are reviewing the framework for managing financial crises to incorporate crisis lessons. They recommend a domestic institutional framework, an effective cross-border cooperation, an emergency liquidity assistance (ELA), a deposit guarantee schem...

  5. SERDP and ESTCP Technical Exchange Meeting on DoD Operational Range Assessment and Management Approaches

    National Research Council Canada - National Science Library

    2007-01-01

    ...) that sought to inform representatives from the range management and assessment communities of applicable technologies developed by SERDP, ESTCP, and the Army Environmental Quality Technology (EQT...

  6. Realizing what's essential: a case study on integrating electronic journal management into a print-centric technical services department.

    Science.gov (United States)

    Dollar, Daniel M; Gallagher, John; Glover, Janis; Marone, Regina Kenny; Crooker, Cynthia

    2007-04-01

    To support migration from print to electronic resources, the Cushing/Whitney Medical Library at Yale University reorganized its Technical Services Department to focus on managing electronic resources. The library hired consultants to help plan the changes and to present recommendations for integrating electronic resource management into every position. The library task force decided to focus initial efforts on the periodical collection. To free staff time to devote to electronic journals, most of the print subscriptions were switched to online only and new workflows were developed for e-journals. Staff learned new responsibilities such as activating e-journals, maintaining accurate holdings information in the online public access catalog and e-journals database ("electronic shelf reading"), updating the link resolver knowledgebase, and troubleshooting. All of the serials team members now spend significant amounts of time managing e-journals. The serials staff now spends its time managing the materials most important to the library's clientele (e-journals and databases). The team's proactive approach to maintenance work and rapid response to reported problems should improve patrons' experiences using e-journals. The library is taking advantage of new technologies such as an electronic resource management system, and library workflows and procedures will continue to evolve as technology changes.

  7. Compendium of technical computer codes used in support of the DOE Office of Civilian Radioactive Waste Management

    International Nuclear Information System (INIS)

    McBride, A.F.; Austin, P.N.; Ward, W.M.; McCarn, L.B.; Roddy, J.W.; Ludwig, S.B.; Reich, W.J.; Roussin, R.W.

    1989-04-01

    A compilation of technical computer codes related to ongoing work under the cognizance of the US Department of Energy's Office of Civilian Radioactive Waste Management (DOE/OCRWM) is presented. Much of the information was obtained from responses to a questionnaire distributed by DOE/OCRWM to all DOE offices associated with the radioactive waste management program. The codes are arranged alphabetically by name. In addition to the code description, each sheet includes other data such as computer hardware and software requirements, document references, name of respondent, and code variants. The codes are categorized into seventeen subject areas plus a miscellaneous category. Some of the subject areas covered are atmospheric dispersion, biosphere transport, geochemistry, nuclear radiation transport, nuclide inventory, and risk assessment. Three appendixes are included which list the names of the contributors, a list of the literature reviewed, and a glossary of computer code terminology and definitions. 50 refs., 3 tabs

  8. An Evaluation of the Federal Energy Management Program Technical Assistance Workshops: Results of a 1998 Customer Survey

    Energy Technology Data Exchange (ETDEWEB)

    G. B. Gordon; N. Hall

    1999-04-01

    This report presents the results of a customer telephone survey of the participants of six workshops provided by the U. S. Department of Energy Federal Energy Management Program (FEMP) during calendar years 1995 and 1996. The primary purpose for the survey was to provide the Team Leader for FEMP Technical Assistance and members of the team with detailed customer feedback pertaining to how well selected FEMP workshops are doing and to identify areas for improvement. The information presented enables managers to see both the strengths of their workshops, as well as workshop components that can be improved. In addition, the report identifies the questions included in the survey that were the most productive for obtaining customers experiences, opinions and recommendations. The experiences gained during this survey provide a platform from which to launch an annual FEMP customer survey.

  9. The research project on technical information basis for aging management in Fukui and Kinki area (2nd report)

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2009-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in 2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experience and results of the participating organizations were considered and the following four topics were extracted. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants. 2) The development of inspection techniques to monitor the initiation and propagation of defects. 3) The development of a guideline for evaluating weld repair methods. 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as of coordinator to make a contracts, facilitate execution, and compile annual reports. In FY2008, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects were related to the second topic (inspection technique) and I subject was related to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  10. The research project on technical information basis for aging management in Fukui and Kinki area. 3rd report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2010-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. (1) The improvement of pipe thinning management in nuclear power plants, (2) The development of inspection techniques to monitor the initiation and propagation of defects, (3) The development of a guideline for evaluating weld repair methods, (4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2009, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  11. Configuration Management Automation (CMA) -

    Data.gov (United States)

    Department of Transportation — Configuration Management Automation (CMA) will provide an automated, integrated enterprise solution to support CM of FAA NAS and Non-NAS assets and investments. CMA...

  12. Marketing: Managing the Marketing Mix. Courseware Evaluation for Vocational and Technical Education.

    Science.gov (United States)

    Fleming, Lian; And Others

    This courseware evaluation rates the Marketing: Managing the Marketing Mix program developed by Control Data Limited. (This program--not contained in this document--is designed to introduce decisions made by marketing managers during the implementation phase of marketing.) Part A describes the program in terms of subject area (marketing, decision…

  13. Technical Training Requirements of Middle Management in the Greek Textile and Clothing Industries.

    Science.gov (United States)

    Fotinopoulou, K.; Manolopoulos, N.

    A case study of 16 companies in the Greek textile and clothing industry elicited the training needs of the industry's middle managers. The study concentrated on large and medium-sized work units, using a lengthy questionnaire. The study found that middle managers increasingly need to solve problems and ensure the reliability of new equipment and…

  14. Knowledge Management: A Tripartite Conceptual Framework for Career and Technical Teacher Educators

    Science.gov (United States)

    Lee, Hae-Young; Roth, Gene L.

    2008-01-01

    Researchers and practitioners consider knowledge management to be a strategic intervention that integrates organizational resources such as technologies and human resources. This conceptual paper focuses on the foundational contributions of economics, sociology, and psychology to knowledge management. Select theories from each foundational area…

  15. Career Anchors and Career Paths: A Panel Study of Management School Graduates. Technical Report No. 1.

    Science.gov (United States)

    Schein, Edgar H.

    The first of a series, this report describes a 10-year followup study of a sample of 44 graduates of the Sloan School of Management, analyzing the interaction of personal values and career events in the lives of managers in organizations. All 44 participants were located, interviewed, and given the same attitude surveys as in the early 1960's.…

  16. Management of aging in technical facilities of E.ON Kernkraft plants; Alterungsmanagement bei technischen Einrichtungen in Anlagen der E.ON Kernkraft GmbH

    Energy Technology Data Exchange (ETDEWEB)

    Reese, Sven H.; Brast, Gerhard [E.ON Kernkraft GmbH, Hannover (Germany); Schoeckle, Friedrich [AMTEC Messtechnischer Service GmbH, Lauffen/N (Germany)

    2009-11-15

    The publication explains, by means of specific measures, the management of aging in technical facilities as practiced in the plants of E.ON Kernkraft GmbH. First, the historical background is outlined and the reasons for introducing management of aging in order to limit and control factors influencing the lifetime of nuclear power plants are described. This is followed by a definition of management of aging in important safety-related facilities as against lifetime management of technical systems relevant to plant availability. This is the context in which the scope of the survey of continuous management of aging is defined in respect of physical aging. A classification is then made in accordance with the staggered requirements to be met in the quality of technical facilities. On the basis of the quality to be assured, the different component groups are assigned corresponding operational measures and explained. These continuous measures extend from failure-oriented maintenance to preventive maintenance to the integrity concept for technical installations. To document the findings and evaluate the effectiveness of the measures taken, the integration of the process is described and reference is made to continuous optimization according to PDCA principles. The explicit introduction of the process of management of aging creates a platform which allows a documentation to be accumulated of the manifold and comprehensive measures taken to control phenomena of aging in technical installations. (orig.)

  17. Community Building Services Training Program: A Model Training Program to Provide Technical Training for Minority Adults in Construction, Building Maintenance,and Property Management. Final Report.

    Science.gov (United States)

    Community Building Maintenance Corp., Chicago, IL.

    A demonstration program, administered by a community based building maintenance, management, and construction corporation, was developed to provide technical training for minority adults in construction, building maintenance, and property management in the Chicago area. The program was concerned with seeking solutions to the lack of housing, job…

  18. New technical knowledge to be implemented to the revision of rules on pipe wall thinning management for PWR Plants. 2006 edition

    International Nuclear Information System (INIS)

    Hirai, Junya; Amano, Yoichi; Nakamura, Takao

    2013-01-01

    Rules for PWR plant pipe wall thinning management were formulated by the Japan Society of Mechanical Engineers in 2006. Since then thinning management of Japanese PWR plants has been carried out based on this rule. Pipe wall thinning phenomena to be dealt with in this rule have been identified in many piping components of power plants. New technical knowledge has been accumulated since the issuance of 2006 edition. We have formulated these knowledge and information about the thinning phenomena in PWR power plants. Given the history of application of this rule, we have to make our best effort to carry out a study of latest technical knowledge and implement them to the revision of rule and improve pipe wall thinning management. This paper summarizes the new technical knowledge and basis to be implemented to the revision of rules on pipe wall thinning management for PWR plants in Japan. (author)

  19. Technically-oriented operation management systems in conjunction with commercial DB systems

    Energy Technology Data Exchange (ETDEWEB)

    Lex, M.; Heselmann, B. [GiS mbH, Erlangen (Germany); Eschbach, P. [BASF Consult GmbH, Muenchen (Germany)

    2001-07-01

    Due to the liberalization of the electricity market, the efficiency and competitiveness of a power plant is increasingly measured at the cost per amount of energy generated. Thus, aspects of market-orientation and clearly cheaper electricity generation are in the foreground. Technically-oriented DP systems are necessary to save operating cost. These systems have structures differing from the mere business-oriented systems, because of the different frame conditions and operators' desire to stand out against rivalling competitors by technical and organizational measures. (orig.) [German] Die Effektivitaet und damit Konkurrenzfaehigkeit eines Kraftwerkes wird mit der Liberalisierung des Strommarktes verstaerkt an den Kosten je erzeugter Energieeinheit gemessen. Fuer den Betrieb ruecken damit Aspekte einer marktgerechten und somit deutlich kostenguenstigeren Stromerzeugung verstaerkt in den Vordergrund. Wer Betriebskosten sparen will, braucht technisch orientierte DV-Systeme, die aufgrund der unterschiedlichen Rahmenbedingungen und des Wunsches aller Anlagenbetreiber, sich durch technisch-organisatorische Massnahmen vom Wettbewerb vorteilhaft abzuheben, voellig andere Strukturen aufweisen als die betriebswirtschaftlich orientierten Systeme. (orig.)

  20. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  1. Fuel storage tanks at FAA facilities : Order 1050.15A : executive summary.

    Science.gov (United States)

    1997-04-30

    The Federal Aviation Administration (FAA) has over 4,000 fuel storage tanks (FST) in its inventory. Most of these FSTs are underground storage tanks (UST) that contain fuel for emergency backup generators providing secondary power to air navigational...

  2. Index to FAA Office of Aviation Medicine reports : 1961 through 1996.

    Science.gov (United States)

    1997-01-01

    An index to Office of Aviation Medicine Reports (1964-1996) and Civil Aeromedical Research Institute Reports is presented as a reference for those engaged in aviation medicine and related activities. The index lists all FAA aviation medicine reports ...

  3. Index to FAA Office of Aerospace Medicine Reports : 1961 Through 2006

    Science.gov (United States)

    2007-01-01

    An index to Federal Aviation Administration Office of Aerospace Medicine Reports (1964-2006) and Civil : Aeromedical Institute Reports (1961-1963) is presented for those engaged in aviation medicine and related : activities. The index lists all FAA a...

  4. Index to FAA Office of Aviation Medicine reports : 1961 through 1993.

    Science.gov (United States)

    1994-01-01

    An index to Office of Aviation Medicine Reports (1964-1993) and Civil Aeromedical Research Institute Reports is presented as a reference for those engaged in aviation medicine and related activities. It lists all FAA aviation medicine reports publish...

  5. Air Traffic Control: Observations on FAA's Air Traffic Control Modernization Program

    National Research Council Canada - National Science Library

    1999-01-01

    In 1981, FAA began a multibillion-dollar modernization effort to improve the safety, capacity, and efficiency of this system to meet the increasing demand for air traffic services and to replace aging equipment...

  6. Report on FAA Deicing Program at La Guardia and O'Hare Airports

    Science.gov (United States)

    1996-10-02

    The Office of Inspector General, Department of Transportation; conducted a : followup inspection of the Federal Aviation Administration (FAA) Deicing : Program. We initiated this study to observe deicing operations as a followup to : our report on th...

  7. Assessment of Head-Injured Aircrew: Comparison of FAA and USAF Procedures

    National Research Council Canada - National Science Library

    Fiedler, Edna

    2001-01-01

    .... The purpose of this paper is to first explain the major differences in missions between the USAF and the FAA, and then outline these procedures and rules, note their similarities and differences...

  8. INFORMATION SECURITYy: Serious Weaknesses Put State Department and FAA Operations at Risk

    National Research Council Canada - National Science Library

    Dodaro, Gene

    1998-01-01

    We are pleased to be asked to discuss our work in computer security. As requested, our testimony will focus on the results of our recent reviews of the Department of State and the Federal Aviation Administration (FAA...

  9. Index to FAA Office of Aerospace Medicine reports : 1961 through 2002.

    Science.gov (United States)

    2003-01-01

    An index to Federal Aviation Administration Office of Aerospace Medicine Reports (1964-2002) : and Civil Aeromedical Institute Reports (1961-1963) is presented for those engaged in aviation : medicine and related activities. The index lists all FAA A...

  10. Index to FAA Office of Aviation Medicine reports : 1961 through 1998.

    Science.gov (United States)

    1999-01-01

    An index to Office of Aviation Medicine Reports (1964-1998) and Civil Aeromedical Research Institute Reports is presented for those engaged in aviation medicine and related activities. The index lists all FAA aviation medicine reports published from ...

  11. Index to FAA Office of Aerospace Medicine reports : 1961 through 2004.

    Science.gov (United States)

    2005-01-01

    An index to Federal Aviation Administration Office of Aerospace Medicine Reports (1964-2004) and : Civil Aeromedical Institute Reports (1961-1963) is presented for those engaged in aviation medicine and : related activities. The index lists all FAA a...

  12. Aviation Acquisition: A Comprehensive Strategy Is Needed for Cultural Change at FAA

    Science.gov (United States)

    1996-08-22

    The Federal Aviation Administration's (FAA) timely acquisition of new air : traffic control equipment has become increasingly critical for aviation safety : and efficiency. However, persistent acquisition problems raise questions about : the agency's...

  13. Index to FAA Office of Aviation Medicine reports : 1961 through 1999.

    Science.gov (United States)

    2000-01-01

    An index to Federal Aviation Administration Office of Aviation Medicine Reports (1964-1999) and : Civil Aeromedical Institute Reports (1961-1963) is presented for those engaged in aviation medicine : and related activities. The index lists all FAA av...

  14. Proposal to FAA for the "Global Analysis and Information Network" ca 1996

    Data.gov (United States)

    National Aeronautics and Space Administration — Response to the FAA request for comments on zero accidents. The responses propose estimating the age-specific field reliability of all aircraft service parts, not...

  15. Inspection Report: FAA's Alleged Circumvention of National Performance Review Staffing Requirements

    Science.gov (United States)

    1996-12-09

    This report responds to a complaint received by the Office of Inspector General : (OIG), Department of Transportation. The complainant alleges the Federal : Aviation Administration (FAA) planned to circumvent National Performance : Review (NPR) staff...

  16. Two studies on participation in decision-making and equity among FAA personnel.

    Science.gov (United States)

    1991-07-01

    Study 1 Moderated multiple regression analyses on data collected from 2,177 FAA air traffic controller specialists indicated that equity perceptions moderated the relationship between participation in decision-making and level of job satisfaction. Sp...

  17. 14 CFR 61.41 - Flight training received from flight instructors not certificated by the FAA.

    Science.gov (United States)

    2010-01-01

    ... the FAA. (a) A person may credit flight training toward the requirements of a pilot certificate or... flight instructor described in paragraph (a) of this section is only authorized to give endorsements to...

  18. Index to FAA Office of Aerospace Medicine reports : 1961 through 2008.

    Science.gov (United States)

    2009-01-01

    An index to Federal Aviation Administration Office of Aerospace Medicine Reports (1964-2008) and Civil : Aeromedical Institute Reports (1961-1963) is presented for those engaged in aviation medicine and related : activities. The index lists all FAA a...

  19. FAA and NASA UTM Research Transition Team: Communications and Navigation (CN) Working Group (WCG) Kickoff Meeting

    Science.gov (United States)

    Jung, Jaewoo; Larrow, Jarrett

    2017-01-01

    This is NASA FAA UTM Research Transition Team Communications and Navigation working group kick off meeting presentation that addresses the followings. Objectives overview Overall timeline and scope Outcomes and expectations Communication method and frequency of meetings Upcoming evaluation Next steps.

  20. Technical infrastructures workshop (Chair). Knowledge Exchange Workshop : Research data management activities and challenges

    NARCIS (Netherlands)

    Grim, R.

    2011-01-01

    Scientific data Infrastructures can be defined as managed digital scientific data-networked environments consisting of services and tools that support: (i) the full life cycle of scientific data (capture, collection, curation, documentation, analysis, visualization, preservation, and publication),

  1. A Common Software Configuration Management System for CERN SPS and LEP Accelerators and Technical Services

    CERN Document Server

    Hatziangeli, Eugenia; Bragg, A E; Ninin, P; Patino, J; Sobczak, H

    1999-01-01

    Software configuration management activities are crucial to assure the integrity of current operational and the quality of new software either being developed at CERN or outsourced. The functionality of the present management system became insufficient with large maintenance overheads. In order to improve our situation, a new software configuration management system has been set up. It is based on Razor, a commercial tool, which supports the management of file versions and operational software releases, along with integrated problem reporting capabilities. In addition to the basic tool functionality, automated procedures were custom made, for the installation and distribution of operational software. Policies were developed and applied over the software development life cycle to provide visibility and control. The system ensures that, at all times, the status and location of all deliverable versions are known, the state of shared objects is carefully controlled and unauthorised changes prevented. It provides ...

  2. A Common Software-Configuration Management System for CERN SPS and LEP Accelerators and Technical Services

    CERN Document Server

    Hatziangeli, Eugenia; Bragg, A E; Ninin, P; Patino, J; Sobczak, H

    2000-01-01

    Software-configuration management activities are crucial to ensure the integrity of current operational software and the quality of new software either being developed at CERN or outsourced. The functionality of the present management system became insufficient with large maintenance overheads. In order to improve our situation, a new software-configuration management system has been set up. It is based on Razor R, a commercial tool, which supports the management of file versions and operational software releases, along with integrated problem-reporting capabilities. In addition to the basic tool functionality, automated procedures were custom-made for the installation and distribution of operational software. The system ensures that, at all times, the status and location of all deliverable versions are known, the state of shared objects is carefully controlled and unauthorized changes prevented. This paper outlines the reasons for selecting the chosen tool, the implementation of the system and the final goal...

  3. Contribution of data processing to technical management of PWR power plants

    International Nuclear Information System (INIS)

    Damestoy, J.P.

    1982-01-01

    In this article are reviewed the equipment used for data processing by local computer and main applications in documentation management, maintenance, daily dosimetry, monitoring, neutronic and thermics computation, material, effluents etc.. [fr

  4. Painting the floor with a hammer: Technical fixes in fisheries management

    DEFF Research Database (Denmark)

    Degnbol, P.; Gislason, Henrik; Hanna, S.

    2006-01-01

    Fisheries management benefits from the contribution of several academic disciplines, each with their own perspectives, concerns and solutions. In this essay we argue that the contribution of biology, economics, sociology and other relevant disciplines to fisheries would be improved...

  5. Managing landfill gas. Techniques and recommendations. To know in order to act - Guides and Technical Guidebook

    International Nuclear Information System (INIS)

    Couturier, Christian; Meiffren, Isabelle; Dumas, Bruno; Galtier, Laurent; Prud'homme, Eric; Hebe, Isabelle; Riquier, Laurent; Miralves, James; Riviere, Georges; Herault, Irene

    2001-12-01

    This guide first recalls some basic notions about landfill gas: presence of three gases in varying proportions (biogas, air, and volatile compounds), biogas composition, toxicity and explosiveness of the various landfill gas components, production mechanism and evolution in time of landfill gas composition. The next part proposes a large and discussed overview of the different objectives of landfill gas management: reduction of environmental impacts, safety and security of people and assets, compliance with regulatory requirements, to provide better conditions for biogas valorisation, long term performance of gas management. Different types of tools and methods are discussed for the study of landfill biogas management and production: calculations, measurements, controls and audits. The design and implementation of gas management systems is then addressed: equipment securing, general procedures, gas capturing, gas collection, gas processing and conditioning, analysis, measurement and control. The next part addresses issues related to exploitation: safety, maintenance organisation, control and command

  6. Building control. Technical building systems: Automation and management; Building Control. Technische Gebaeudesysteme: Automation und Bewirtschaftung

    Energy Technology Data Exchange (ETDEWEB)

    Kranz, H.R.; Baenninger, M.; Bieler, P.; Brettschneider, J.P.; Damnig, A.; Fassbender, H.W.; Friedrichs, K.; Gauchel, J.; Hegewald, B.; Kaelin, W.; Lezius, A.; Markert, H.; Oehler, A.; Otto, J.; Puettmer, M. Jr.; Rohrbacher, H.; Schuerdt, K.; Vogt, D.; Wittling, J.

    1995-12-31

    Cost-optimised management and maintenance of buildings can no longer be carried out without electronic data processing. The present anthology gives a comprehensive overview of the planning and operation of building automation systems. The following topics are discussed: ecological cooling and facade concepts, facility management, jeopardy alarm technology, building automation, communication technology, open communication and networks, building system technology, norms and directives, building right and law. A special abstract has been prepared for each of the 23 chapters. (BWI). 260 figs., 161 refs. [Deutsch] Kostenoptimiertes Management, Bewirtschaftung und Instandhaltung von Gebaeuden sind ohne EDV nicht mehr denkbar. Das vorliegende Buch gibt einen umfassenden Ueberblick ueber Planung und Betrieb von Gebaeudeautomationssystemen. Es wird dabei auf folgende Themenkomplexe eingegangen: Oekologische Kuehl- und Fassadenkonzepte; Facility Management, Gefahrenmeldetechnik, Gebaeudeautomation; Kommunikationstechnik, offenen Kommunikation und Netzwerke; Gebaeudesystemtechnik und Installationsbus; Energiemanagement; Betreibererfahrungen; Normen und Richtlinien; Baurecht und Gesetz. Fuer alle 23 Einzelkapitel wurde eine gesonderte inhaltliche Erschliessung durchgefuehrt. (BWI)

  7. Technical, environmental and regulatory aspects of waste management and their reflection in the IAEA programme

    International Nuclear Information System (INIS)

    Richter, D.K.

    1982-01-01

    Within the IAEA training course on waste management this paper is intended to overview technological, radiological, encironmental, regulatory and institutional aspects of importance in establishing a waste management policy for nuclear power programmes; the objectives and results of IAEA activities in this field; and some current issues from a national and international perspective with special consideration on the needs of countries embarking on nuclear power. (orig./RW)

  8. Technical Evaluation Report 25: Open Source Software: Two learning management systems

    Directory of Open Access Journals (Sweden)

    Jim Depow

    2003-10-01

    Full Text Available This report is the second in a two-part series about open source (OSS and free software (FS systems in online education. These are rapidly emerging as alternatives to costly proprietary learning management systems (LMS and content management systems (CMS. This report reviews two LMS systems and one CMS system, all developed on the OSS/ FS principle and available to users free of charge.

  9. Radioactive waste management services. Safety and technical advisory services available from the IAEA

    International Nuclear Information System (INIS)

    2000-09-01

    This brochure provides updated information about the services and assistance the International Atomic Energy Agency (IAEA) is able to render, upon request by Member States, in the area of radioactive waste management. The ultimate objective is to ensure that all wastes are managed safely and in a way which protects both individual and the environment, now and in the future. The IAEA is the sole global international organization with the statutory authority to establish safety standards for the protection of health against exposure to ionizing radiation. These include safety standards for radioactive waste management. A comprehensive set of such standards is being established, and continuously updated, under the Agency's aegis, which lay out the requirements for the safe management of all types of radioactive waste. The Agency has a further statutory obligation ro provide for the application of these standards at the request of States. The safety of radioactive waste management is not attainable through safety standards alone but requires special technology. An additional function of the IAEA is thus to foster the transfer of technology among States, including the specific technology needed to ensure safe radioactive waste management

  10. FAA-NASA Sixth International Conference on the Continued Airworthiness of Aircraft Structures

    Science.gov (United States)

    1995-12-01

    Administration, and Colin G. Drury , State University of New York at Buffalo The Aging Aircraft Nondestructive Inspection Validation Center - A R esource for...William T. Shepherd FAA-Office of Aviation Medicine Washington, DC and Colin G. Drury State University of New York at Buffalo Buffalo, NY INTRODUCTION FAA’s...improvement, changing the task, the operator (inspector), machine, or environment as appropriate, e.g., review in Drury , 1992 (Ref. 1). 2. From the

  11. Influence of technical maintenance measures on ecological status of agricultural lowland rivers - Systematic review and implications for river management.

    Science.gov (United States)

    Bączyk, Anna; Wagner, Maciej; Okruszko, Tomasz; Grygoruk, Mateusz

    2018-06-15

    Intensification of agriculture and ongoing urban sprawl exacerbate pressures on rivers. Small rivers in agricultural landscapes are especially exposed to excessive technical actions implemented in order to allow for harvesting river water for irrigation, draining agricultural water and receiving sewage. Regular dredging and macrophyte removal strongly interfere with the global need for preserving river biodiversity that allows agricultural lowland rivers to remain refuges for a variety of species, and-accordingly-to keep water bodies resilient for the benefit of society. In order to provide a comprehensive look at the influence of agricultural lowland river management on the ecological status of these water bodies, we conducted a literature review and a meta-analysis. For the structured literature review we selected 203 papers reflecting on the response of aquatic ecosystems to dredging and macrophyte management actions. The database of scientific contributions developed for our study consists of papers written by the authors from 33 countries (first authorship) addressing dredging, macrophyte removal, status of fish and macroinvertebrates as well as the general ecological status of lowland agricultural rivers. We revealed that 96% of the analyzed papers indicated unilateral, negative responses of aquatic ecosystems, particularly macroinvertebrates, ichthyofauna and macrophyte composition, to maintenance measures. We revealed that studies conducted in the European Union on the ecological status of rivers appeared to significantly increase in quantity after the implementation of the Water Framework Directive. Finally, we concluded that day-to-day management of lowland agricultural rivers requires revision in terms of compliance with environmental conservation requirements and the recurrent implementation of technical measures for river maintenance. Copyright © 2018 Elsevier B.V. All rights reserved.

  12. From Management to Negotiation: Technical and Institutional Innovations for Integrated Water Resource Management in the Upper Comoé River Basin, Burkina Faso

    Science.gov (United States)

    Roncoli, Carla; Kirshen, Paul; Etkin, Derek; Sanon, Moussa; Somé, Léopold; Dembélé, Youssouf; Sanfo, Bienvenue J.; Zoungrana, Jacqueline; Hoogenboom, Gerrit

    2009-10-01

    This study focuses on the potential role of technical and institutional innovations for improving water management in a multi-user context in Burkina Faso. We focus on a system centered on three reservoirs that capture the waters of the Upper Comoé River Basin and servicing a diversity of users, including a sugar manufacturing company, a urban water supply utility, a farmer cooperative, and other downstream users. Due to variable and declining rainfall and expanding users’ needs, drastic fluctuations in water supply and demand occur during each dry season. A decision support tool was developed through participatory research to enable users to assess the impact of alternative release and diversion schedules on deficits faced by each user. The tool is meant to be applied in the context of consultative planning by a local user committee that has been created by a new national integrated water management policy. We contend that both solid science and good governance are instrumental in realizing efficient and equitable water management and adaptation to climate variability and change. But, while modeling tools and negotiation platforms may assist users in managing climate risk, they also introduce additional uncertainties into the deliberative process. It is therefore imperative to understand how these technological and institutional innovations frame water use issues and decisions to ensure that such framing is consistent with the goals of integrated water resource management.

  13. The management of radioactive wastes produced by radioisotope users. Technical addendum

    International Nuclear Information System (INIS)

    1966-01-01

    This Addendum contains detailed technical information on processes and procedures that are outlined in more general terms in the Code of Practice. The information is particularly relevant to the problem of handling the relatively small quantities of waste arising from the use of radionuclides in laboratories, hospitals and industry when no special facilities for radioactive waste treatment are available on site. The Addendum is directed toward providing the radioisotope user with the type and amount of information required for him to be able to assess the alternatives available to him in terms of his particular needs, develop a preliminary design of an optimum waste-handling system and get help and guidance in his search for more detailed information.

  14. Status of the technical project design phase of the German Waste Management Center

    International Nuclear Information System (INIS)

    Mischke, J.

    1978-01-01

    Under the waste management concept of the German Federal Government the utilities are to assume responsibility for waste management of the German nuclear power plants within the framework of the polluter pays principle, the ultimate storage of radioactive waste remaining a responsibility of the government. The duties of industry chiefly include planning, construction and operation of the facilities for fuel element storage, reprocessing and waste treatment and for processing the recovered nuclear fuel. The German utilities operating and planning nuclear power plants have set up the Deutsche Gesellschaft fuer Wiederaufarbeitung von Kernbrennstoffen mbH (DWK), which is to build the Waste Management Center and also works on the interim solutions planned for continuous waste management up to the completion of the planned Waste Management Center. For this purpose, DWK plans to construct temporary fuel storage facilities and has entered into agreements to secure reprocessing abroad of fuel elements from German nuclear power plants. In discharging its obligations DWK has acquired the extensive know-how available in the Federal Republic in the field of reprocessing spent fuel elements. (orig.) [de

  15. Earned Value Management Considering Technical Readiness Level and Its Application to New Space Launcher Program

    Science.gov (United States)

    Choi, Young-In; Ahn, Jaemyung

    2018-04-01

    Earned value management (EVM) is a methodology for monitoring and controlling the performance of a project based on a comparison between planned and actual cost/schedule. This study proposes a concept of hybrid earned value management (H-EVM) that integrates the traditional EVM metrics with information on the technology readiness level. The proposed concept can reflect the progress of a project in a sensitive way and provides short-term perspective complementary to the traditional EVM metrics. A two-dimensional visualization on the cost/schedule status of a project reflecting both of the traditional EVM (long-term perspective) and the proposed H-EVM (short-term perspective) indices is introduced. A case study on the management of a new space launch vehicle development program is conducted to demonstrate the effectiveness of the proposed H-EVM concept, associated metrics, and the visualization technique.

  16. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  17. Nuclear knowledge management - The role of the IAEA and its Technical Cooperation programme

    International Nuclear Information System (INIS)

    Ahmad, I.

    2004-01-01

    The paper presents the essentials of sound knowledge management, including NKM: capturing and storing relevant data; conversion of tacit knowledge to explicit knowledge; use information to develop knowledge; networking; building knowledge management culture. An overview is made of the various departments of the IAEA their role from the perspective of KM. It is stated that in addition to consolidating KM-related activities in the departments, there is a need to develop a central focal point, specially to devise strategies for meeting the expected shortages of young professionals and harmonizing and enhancing the training activities. Another area should be strengthening and modernizing INIS and national information services

  18. EP&R Standards Project Report: Technical Review of National Incident Management Standards

    Energy Technology Data Exchange (ETDEWEB)

    Stenner, Robert D.

    2007-04-24

    The importance and necessity for a fully developed and implemented National Incident Management System (NIMS) has been demonstrated in recent years by the impact of national events such as Hurricane Katrina in 2005. Throughout the history of emergency response to major disasters, especially when multiple response organizations are involved, there have been systemic problems in the consistency and uniformity of response operations. Identifying national standards that support the development and implementation of NIMS is key to helping solve these systemic problems. The NIMS seeks to provide uniformity and consistency for incident management by using common terminology and protocols that will enable responders to coordinate their efforts to ensure an efficient response.

  19. Technical Evaluation Report 30: Vendor-Assisted Evaluation of a Learning Management System

    Directory of Open Access Journals (Sweden)

    Adrienne De Schutter

    2004-04-01

    Full Text Available A product evaluation was conducted of Desire2Learn, an online learning management system gaining popularity in educational institutions. Since an online trial version of the software was not available for evaluation, an inspection meeting with the vendor was arranged. This provided the evaluation team with an opportunity to examine the precautions necessary for ensuring the objectivity of a product evaluation based on vendor-supplied information. The report outlines the team’s use of evaluator-driven enquiry and a triangulated approach to information checking. The Desire2Learn product is assessed as a flexible and useful addition to the range of learning management system options.

  20. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    Science.gov (United States)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  1. An Introduction to the NCHEMS Costing and Data Management System. Technical Report No. 55.

    Science.gov (United States)

    Haight, Mike; Martin, Ron

    The NCHEMS Costing and Data Management System is designed to assist institutions in the implementation of cost studies. There are at least two kinds of cost studies: historical cost studies which display cost-related data that reflect actual events over a specific prior time period, and predictive cost studies which forecast costs that will be…

  2. Military Curricula for Vocational and Technical Education. Traffic Management and Accident Investigation, 17-8.

    Science.gov (United States)

    Air Force, Washington, DC.

    This teaching guide and student workbook for a postsecondary level course in traffic management and accident investigation is one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. Purpose stated for the 132-hour course is to expose students to…

  3. MULTIAGENT TECHNOLOGIES’ METHOD IN MANAGING BUSINESS-PROCESSES OF THE TECHNICAL PREPARING FOR PRODUCTION

    Directory of Open Access Journals (Sweden)

    P.N. Pavlenko

    2005-02-01

    Full Text Available  The method of managing the process of the extended productions technological preparation is given. The method is used for integrating the automated systems of industrial assignment of  CAD/CAM/SAPP and ERP systems.

  4. Management system of simple rental flats study based on technical aspect and health in Medan city

    Science.gov (United States)

    Novrial; Indra Cahaya, S.

    2018-03-01

    Medan city is a metropolis city in Sumatera that has slums area. Simple rental flats have been built to overcome the problem. However the preliminary survey result showed that the physical and non-physical environment management of simple rent flats is very bad. This study conducted in 3 simple rent flats. It has observed the simple rent flats environment and has interviewed occupants and related agencies. Results of conducted research showed the occupant’s characteristics based on the largest percentage are Javanese; last education is senior high with self-employed work with average income Rp 1,000,000 – Rp 2,500,000. Waste retribution submitted to their cleanliness except for Amplas simple rent flats, their waste management system does not manage properly and the garbage littered. The number of family members of Wisma Labuhan and Amplas simple rent flats exceeds the regulation number of occupants, so it is crowded and noisy. Physical conditions of Amplas simple rent flats are bad, septic tank is full and are not vacuumed. Clean water sources derived from wells and artesian wll are vulnerable to be contaminated by pollutants such as leachate and bad quality water. It is necessary to improve the physical, basic sanitation, and guidance for the simple rent flats occupants to the management system of Simple Rent Flats.

  5. Various endovascular approaches to the management of free floating carotid thrombi: a technical report.

    Science.gov (United States)

    Park, Jee Won; Lee, Deok Hee; Choi, Choong Gon; Kim, Sang Joon; Suh, Dae Chul

    2012-09-01

    Ischemic strokes are seldom caused by free floating thrombi (FFTs) in the carotid artery. Because FFTs are fairly uncommon and their pathophysiology has not yet been clarified, no definite management guidelines have been established. Four consecutive patients with FFTs in the internal and/or common carotid artery are described. These patients were successfully treated by various endovascular treatment methods.

  6. Military Curriculum Materials for Vocational and Technical Education. Commissary Store Management, QMO 387, 19-3.

    Science.gov (United States)

    Army Quartermaster School, Ft. Lee, VA.

    This instruction booklet and single-lesson assignment booklets for a secondary-postsecondary level course in commissary store management are one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. Purpose stated for the course is to provide store…

  7. Training Needs Assessment of Technical Skills in Managers of Tehran Electricity Distribution Company

    Science.gov (United States)

    Koohi, Amir Hasan; Ghandali, Fatemeh; Dehghan, Hasan; Ghandali, Najme

    2016-01-01

    Current dissertation has been conducted in order to investigate and detect training needs of the mangers (top and middle) in Tehran Electricity Distribution Company. Research method is applied kind based on its purpose. Due to data collection method, this query is descriptive-survey type. Statistical population in this study is all of managers in…

  8. A technical investigation on tools and concepts for sustainable management of the subsurface in The Netherlands

    NARCIS (Netherlands)

    Griffioen, Jasper; van Wensem, Joke; Oomes, Justine L.M.; Barends, Frans; Breunese, Jaap; Bruining, Hans; Olsthoorn, Theo; Stams, Alfons J.M.; van der Stoel, Almer E.C.

    2014-01-01

    In response to increasing use of the subsurface, there is a need to modernise policies on sustainable use of the subsurface. This holds in particular for the densely populated Netherlands. We aimed to analyse current practice of subsurface management and the associated pressure points and to

  9. A technical investigation on tools and concepts for sustainable management of the subsurface in The Netherlands.

    NARCIS (Netherlands)

    Griffioen, J.; Wensem, van J.; Oomes, J.L.; Barends, F.; Breunese, J.; Bruining, H.; Olsthoorn, T.; Stams, A.J.M.; Stoel, van der A.E.

    2014-01-01

    In response to increasing use of the subsurface, there is a need to modernise policies on sustainable use of the subsurface. This holds in particular for the densely populated Netherlands. We aimed to analyse current practice of subsurface management and the associated pressure points and to

  10. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    Science.gov (United States)

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  11. Technical Evaluation Report 24: Open Source Software: an alternative to costly Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Jim Depow

    2003-10-01

    Full Text Available This is the first in a series of two reports discussing the use of open source software (OSS and free software (FS in online education as an alternative to expensive proprietary software. It details the steps taken in a Canadian community college to download and install the Linux Operating System in order to support an OSS/ FS learning management system (LMS.

  12. Execution management of batter piles and problems of technical development. Uchikomi kui no seko kanri to gijutsu kaihatsu no kadai

    Energy Technology Data Exchange (ETDEWEB)

    Ninomiya, Y [JDC Corp., Tokyo (Japan); Omori, H [Nippon Kokan Koji K.K., Yokohama (Japan)

    1991-05-15

    This report introduces the practical examples of the present system of execution manegement. Necessary functions and basic problems are described as well as the possibility of utilizing hydraulic/pneumatic pressure for the automation or the robotization which are the future technical problems. Application examples are also shown on the execution management system by means of an accelometer which was developed by the authors. This area is not long after the start of study. Essential points of the execution management of the batter piles are that the front tips of the piles are confirmed to be securely penetrated to the specified depth in the specific support layer giving the required supporting strength at the same time. For this purpose, what are required are to accurately measure the penetration displacement of the piles and assess the maximum penetration and final penetration and the amount of the rebound. Then the support strength should be checked from the dynamic support force. For this, it is required to develop an execution management system which is simple and adept for the operation at the spot. 9 refs., 12 figs., 5 tabs.

  13. 14 CFR 13.234 - Petition to reconsider or modify a final decision and order of the FAA decisionmaker on appeal.

    Science.gov (United States)

    2010-01-01

    ... decision and order of the FAA decisionmaker on appeal. 13.234 Section 13.234 Aeronautics and Space FEDERAL... PROCEDURES Rules of Practice in FAA Civil Penalty Actions § 13.234 Petition to reconsider or modify a final decision and order of the FAA decisionmaker on appeal. (a) General. Any party may petition the FAA...

  14. ANL Technical Support Program for DOE Environmental Restoration and Waste Management. Annual report, October 1992--September 1993

    International Nuclear Information System (INIS)

    Bates, J.K.; Bourcier, W.L.; Bradley, C.R.

    1994-06-01

    This report is an overview of the progress during FY 1993 for the Technical Support Program that is part of the ANL Technology Support Activity for DOE Environmental Restoration and Waste Management (EM). The purpose is to evaluate, before hot start-up of the Defense Waste Processing Facility (DWPF) and the West Valley Demonstration Project (WVDP), factors that are anticipated to affect glass reaction in an unsaturated environment typical of what may be expected for the candidate Yucca Mountain repository site. Specific goals for the testing program include the following: reviewing and evaluating available data on parameters that will be important in establishing the long-term performance of glass in a repository environment; performing tests to further quantify the effects of important variables where there are deficiencies in the available data; and initiating long-term tests to determine glass performance under a range of conditions applicable to repository disposal

  15. GT-MHR COMMERCIALZATION STUDY. TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD MAY 1 THROUGH MAY 31, 2003

    International Nuclear Information System (INIS)

    SHENOY, A.S.

    2003-01-01

    A271 GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD MAY 1 THROUGH MAY 31, 2003. Petten advised GA the start of the HFR-EU2 irradiation is being delayed until late July 2004. HFR-EU1 (pebble fuel) is also delayed until February/March 2004. The reason for the delays was implementation of new financial regulations at Petten that delayed the contracts for capsule fabrication. Review of the MHR-2 Fuel Product Specification was completed. Revision of the specification to incorporate the review results is in progress. Detailed test matrices have been drafted for capsule irradiation tests and for post-irradiation heating tests proposed for development and qualification of advanced coated-particle fuels capable of meeting anticipated VHTR fuel performance requirements

  16. GT-MHR COMMERCIALZATION STUDY. TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD JUNE 1 THROUGH JUNE 30, 2003

    International Nuclear Information System (INIS)

    SHENOY, A.S.

    2003-01-01

    A271 GT-MHR COMMERCIALZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD JUNE 1 THROUGH JUNE 30, 2003. Petten was provided with irradiation dimensional change data for both fuel compacts and H-451 graphite for design of the graphite sleeves that hold the fuel compacts to be irradiated in HFR-EU2. The Fuel Sample Product Specification for the Fuel Performance Irradiation Test Capsule MHR-2 was completed and approved. A Work Breakdown Structure was prepared for the development and qualification of advanced coated-particle fuels capable of meeting anticipated fuel performance requirements and work was initiated on preparation of schedules and a cost estimates for the test matrices

  17. GT-MHR COMMERCIALIZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003

    International Nuclear Information System (INIS)

    Shenoy, A.S.

    2003-01-01

    OAK A271 GT-MHR COMERCIALiZATION STUDY TECHNICAL PROGRESS AND COST MANAGEMENT REPORT FOR THE PERIOD AUGUST 1 THROUGH AUGUST 31, 2003. In the process of fabricating the MHR-1 irradiation test capsule, Petten has advised that three thermocouples (out of 24) and the Self Powered Neutron detector were damaged during high temperature brazing with the upper capsule lid. Procurement of new TCs and SPN is in process but there will be a delay in the irradiation test of about nine weeks. Startup of the irradiation is now projected to be July or August 2004. In preparation for performing the nuclear design analysis activities required by the advanced fuel studies task, a complete 3-D nuclear design analysis is first being performed of the GT-MHR reference design. This will serve as the baseline for studies of the advanced fuel nuclear design performance

  18. The Hybrid Design: Integrating the Human and Technical Components of Just-In-Time Knowledge Management Systems

    Directory of Open Access Journals (Sweden)

    Nabie Y. Conteh

    2011-06-01

    Full Text Available This paper explores the right balance of human and technical resources in the design of Just-in-Time knowledge delivery. It also examines and analyzes the case study: “Teltech: The business of Knowledge Management” by Davenport. It further attempts to depict the characteristics of the hybrid. The paper describes how the hybrid can be applied to Just-In-Time knowledge delivery. It also seeks to analyze and explore its interplay with knowledge splits with a view to designing Just-In- Time Knowledge Management. These include: “tacit versus explicit knowledge”, “in-process” versus “after action” documentation, “process-centered versus product-centered approach”, “knowledge versus information” and the “culture of sharing versus hoarding.”

  19. 76 FR 35103 - Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment

    Science.gov (United States)

    2011-06-16

    ... which initial and transition flight training must include an in-flight element. Technical Amendment This.... 28471; Amendment Nos. 121-355 and 135-125] RIN 2120-AF08 Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment AGENCY: Federal Aviation Administration (FAA...

  20. Multiple-use Management of Irrigation Systems: Technical Constraints and Challenges

    Science.gov (United States)

    Gowing, J.; Li, Q.; Mayilswami, C.; Gunawardhana, K.

    It is now widely recognised that many irrigation systems, originally planned only for irrigation supply, are de facto multiple-use systems. However, the importance of non- irrigation uses (such as bathing, laundry, livestock watering and fishing), to the liveli- hoods of the rural poor has generally been ignored. This has significant implications for irrigation engineers, water resources managers and other decision-makers. An im- proved understanding of competition and complementarity between these uses and irrigation demands is essential for effective multiple-use management of irrigation systems.This paper presents a study of multiple-use management, where the focus is on integrating aquaculture within irrigation systems with and without secondary storage. The Lower Bhavani scheme in South India and Mahaweli System H in Sri- Lanka were selected as representative smallholder irrigation schemes: - The Lower Bhavani scheme comprises a 200km contour canal serving a command area of 78,500ha. Apart from the main dam, there are no storage structures within the irriga- tion system. - Mahaweli System H comprises a command area of 43,000ha served by three main canals. The feature of particular interest in this scheme is the large number of secondary storage structures (known locally as tanks), which are in- tegrated within the canal network. It is apparent from these two sites and from studies elsewhere that non-irrigation uses are important to the livelihoods of the local peo- ple, but these uses are largely opportunistic. The failure to give explicit recognition to non-irrigation uses has important implications for assessments of economic per- formance and water productivity of irrigation systems. However, any attempt to give proper recognition to these alternative uses also has implication for irrigation project management. This paper describes a detailed study of water management in the two irrigation systems. The method of investigation involves in-depth studies in

  1. The Fanconi anemia proteins FAA and FAC function in different cellular compartments to protect against cross-linking agent cytotoxicity.

    Science.gov (United States)

    Kruyt, F A; Youssoufian, H

    1998-10-01

    Fanconi anemia (FA) is an autosomal recessive disease characterized by chromosomal instability, bone marrow failure, and a high risk of developing malignancies. Although the disorder is genetically heterogeneous, all FA cells are defined by their sensitivity to the apoptosis-inducing effect of cross-linking agents, such as mitomycin C (MMC). The cloned FA disease genes, FAC and FAA, encode proteins with no homology to each other or to any known protein. We generated a highly specific antibody against FAA and found the protein in both the cytoplasm and nucleus of mammalian cells. By subcellular fractionation, FAA is also associated with intracellular membranes. To identify the subcellular compartment that is relevant for FAA activity, we appended nuclear export and nuclear localization signals to the carboxy terminus of FAA and enriched its localization in either the cytoplasm or the nucleus. Nuclear localization of FAA was both necessary and sufficient to correct MMC sensitivity in FA-A cells. In addition, we found no evidence for an interaction between FAA and FAC either in vivo or in vitro. Together with a previous finding that FAC is active in the cytoplasm but not in the nucleus, our results indicate that FAA and FAC function in separate subcellular compartments. Thus, FAA and FAC, if functionally linked, are more likely to be in a linear pathway rather than form a macromolecular complex to protect against cross-linker cytotoxicity.

  2. Technical/ administrative options for managing tritium MCL exceedances in P-area groundwater and Steel Creek

    Energy Technology Data Exchange (ETDEWEB)

    Ross, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-04-01

    This white paper was requested by the Core Team (United States Department of Energy [USDOE], United States Environmental Protection Agency [USEPA], and South Carolina Department of Health and Environmental Control [SCDHEC]) at the P-Area Groundwater (PAGW) Operable Unit (OU) Scoping Meeting held in January 2017 to discuss recent data and potential alternatives in support of a focused Corrective Measures Study/Feasibility Study (CMS/FS). This white paper presents an overview of the problem, and a range of technical and administrative options for addressing the tritium contamination in groundwater and Steel Creek. As tritium cannot be treated practicably, alternatives are limited to media transfer, containment and natural attenuation principally relying on radioactive decay. Using other groundwater OU decisions involving tritium as precedent, Savannah River Nuclear Solutions (SRNS) recommends that final tritium alternatives be evaluated in a CMS/FS, understanding that the likely preferred remedy will include natural attenuation with land use controls (LUCs). This is based on the inability to significantly reduce tritium impact to Steel Creek using an engineered solution as compared to natural attenuation. The timing of this evaluation could be conducted concurrently with the final remedy evaluation for volatile organic compounds (VOCs).

  3. Double row spacing and drip irrigation as technical options in energy sorghum management

    Directory of Open Access Journals (Sweden)

    Neri Roncucci

    2014-02-01

    Full Text Available The effect of two row spacing configurations and four water supply levels was investigated on sweet and fibre sorghum in Central Italy for two consecutive years. Results highlighted the influence of both irrigation and row spatial configuration on crop productivity. Indeed, several studies have pointed out the positive response of sorghum to irrigation in Mediterranean climate, as in this environment water stress represents one of the main limiting factors on crop productivity. On the other hand, few attempts have been made to explore the role of row spacing on energy sorghum productivity. Results outlined an average increase in sorghum dry biomass yield ranging from +23% to +79% at variable rates of water supply as compared to rainfed control. The positive effect of irrigation was also observed on leaf area index and radiation use efficiency. Moreover, we observed a crop yield increase, from 9% to 20%, under double row spacing compared to the standard planting pattern (i.e. single row spacing. Finally, it was confirmed the efficient use of water by sorghum and the great ability of sorghum to increase its biomass yield in response to increasing volumes of water supplied. Therefore, this work suggests how row spacing configuration and drip irrigation could be feasible technical options to increase sorghum biomass yields in Mediterranean environments. These techniques should be experienced by farmers towards a sustainable intensification of current cropping systems.

  4. Current technics and management strategy for Pu-contaminated wastes at PNC

    International Nuclear Information System (INIS)

    1981-02-01

    Power Reactor and Nuclear Fuel Development Corporation (PNC) was designated as a leading organization for the Pu-contaminated waste technology program in Japan. For this purpose, number of efforts in the research and development are proceeding. That is, Pu-contaminated waste technology including volume reduction system and the immobilization of wastes is being developed. The design of a Pu-contaminated waste treatment facility (PWTF) is being made for the demonstration of the technology developed. Studies are in progress to find the criteria for waste products in disposal. The current procedures and strategy for the management of Pu-contaminated wastes at PNC are described as follows: current and future management; technology development including controlled air incineration, acid digestion, immobilization melting, dismantling, and liquid waste treatment; the Pu-contaminated waste treatment facility. (J.P.N.)

  5. Economic and technical advantages of high temperature processes in high level radioactive waste management

    International Nuclear Information System (INIS)

    Jouan, A.; Jacquet-Francillon, N.; Cler, M.

    1991-01-01

    The estimated waste management costs incurred for the three principal waste forms produced by reprocessing spent fuel are compared from a theoretical economic standpoint. The cost of vitrifying concentrated fission product solutions is considered first, together with the estimated additional costs of transportation and final storage in a geological repository. Fuel cladding waste treatments are then examined by comparing the relative costs of cementation, compaction and melting; processes for disposal of incinerable alpha-bearing wastes are also considered. In each case, the processes ensuring the greatest waste volume reduction not only result in the lowest management cost, but are also most effective in ensuring the highest possible containment quality for the final waste package

  6. Irradiated Fuel Management Advisory Programme (IFMAP). An interregional technical co-operation project

    International Nuclear Information System (INIS)

    1993-04-01

    Delays in the implementation of the fuel reprocessing option in some countries, the complete abandonment of this option in other countries, and delays in the availability of final spent fuel disposal in almost all countries, has led to increasingly long periods of 'interim' spent fuel storage. The problem of the management of irradiated fuels has therefore increased in importance for many Member States. For power reactors or research reactors, irradiated fuel management includes all of the procedures involving irradiated fuel from the time that it is discharged from the reactor core until it is either reprocessed or placed in a permanent disposal site. Although the IAEA has had programmes in this area in the past and has ongoing activities at present, there is a clear need to provide support to individual Member States which require advice and/or assistance in the resolution of particular questions and concerns

  7. Economic and technical advantages of high-temperature processes in high-level radioactive waste management

    International Nuclear Information System (INIS)

    Jouan, A.; Jacquet-Francillon, N.; Cler, M.; Chaudon, L.

    1991-01-01

    The estimated waste management costs incurred for the three principal waste forms produced by reprocessing spent fuel are compared from a theoretical economic standpoint. The cost of vitrifying concentrated fission product solutions is considered first, together with the estimated additional costs of transportation and final storage in a geological repository. Fuel cladding waste treatments are then examined by comparing the relative costs of cementation, compaction and melting; processes for disposal of incinerable alpha-bearing wastes are also considered. In each case, the processes ensuring the greatest waste volume reduction not only result in the lowest management cost, but are also most effective in ensuring the highest possible containment quality for the final waste package

  8. Understanding and Managing Causality of Change in Socio-Technical Systems 3

    Science.gov (United States)

    2012-01-06

    influence, and (4) management and control. The questions are listed below. Dynamics and Context  What can be learned from patterns of causal...has proven to be an insufficient method to determine existence of behavioral and performance patterns . Cognitive work analysis, on the other hand...to provide a point of comparison, including Victorian bushfires, Queensland and Victorian floods, and the mine collapse in Chile. Privacy, Threats

  9. Technical, organizational and human-centered requirements for the purpose of accident management

    International Nuclear Information System (INIS)

    Berning, A.; Fassmann, W.; Preischl, W.

    1998-01-01

    A catalog of ergonomic recommendations for organizational measures and design of paper documented work aids for accident management situations in nuclear power plants was developed. Attention was given to provide recommendations meeting practical needs and being sufficiently flexible to allow plant specific [aptation. A weight was assigned to each recommendation indicating its importance. The development of the recommendations was based on the state of the art concerning research and practical experience. Results from walk-/talk-through experiments, training and exercises, discussions with on-site experts, and investigations of emergency manuals from German and foreign nuclear power plants were taken into account. The catalog is founded on a bro[ knowledge base covering important aspects. The catalog is intended for qualitative evaluation and design of organizational measures and procedures. The catalog shall assure high quality. The project further provides an important contribution to the standardization of organizational and human centered demands concerning accident management procedures. Thus it can contribute to develop general regulations regarding ergonomic design of accident management measures. (orig.) [de

  10. Technical note: Efficient online source identification algorithm for integration within a contamination event management system

    Science.gov (United States)

    Deuerlein, Jochen; Meyer-Harries, Lea; Guth, Nicolai

    2017-07-01

    Drinking water distribution networks are part of critical infrastructures and are exposed to a number of different risks. One of them is the risk of unintended or deliberate contamination of the drinking water within the pipe network. Over the past decade research has focused on the development of new sensors that are able to detect malicious substances in the network and early warning systems for contamination. In addition to the optimal placement of sensors, the automatic identification of the source of a contamination is an important component of an early warning and event management system for security enhancement of water supply networks. Many publications deal with the algorithmic development; however, only little information exists about the integration within a comprehensive real-time event detection and management system. In the following the analytical solution and the software implementation of a real-time source identification module and its integration within a web-based event management system are described. The development was part of the SAFEWATER project, which was funded under FP 7 of the European Commission.

  11. Final Scientific/Technical Report: Context-Aware Smart Home Energy Manager (CASHEM)

    Energy Technology Data Exchange (ETDEWEB)

    Foslien, Wendy K. [Honeywell International Inc., Golden Valley, MN (United States); Curtner, Keith L. [Honeywell International Inc., Golden Valley, MN (United States)

    2013-01-15

    Because of growing energy demands and shortages, residential home owners are turning to energy conservation measures and smart home energy management devices to help them reduce energy costs and live more sustainably. In this context, the Honeywell team researched, developed, and tested the Context Aware Smart Home Energy Manager (CASHEM) as a trusted advisor for home energy management. The project focused on connecting multiple devices in a home through a uniform user interface. The design of the user interface was an important feature of the project because it provided a single place for the homeowner to control all devices and was also where they received coaching. CASHEM then used data collected from homes to identify the contexts that affect operation of home appliances. CASHEM's goal was to reduce energy consumption while keeping the user's key needs satisfied. Thus, CASHEM was intended to find the opportunities to minimize energy consumption in a way that fit the user's lifestyle.

  12. Spent Fuel Test-Climax: technical measurements data management system description and data presentation

    International Nuclear Information System (INIS)

    Carlson, R.C.

    1985-08-01

    The Spent Fuel Test-Climax (SFT-C) was located 420 m below surface in the Climax Stock granite on the Nevada Test Site. The test was conducted under the technical direction of the Lawrence Livermore National Laboratory (LLNL) as part of the Nevada Nuclear Waste Storage Investigations (NNWSI) for the US Department of Energy. Eleven canisters of spent nuclear reactor fuel were emplaced, along with six electrical simulators, in April-May 1980. The spent fuel canisters were retrieved and the electrical simulators de-energized in March-April 1983. During the test, just over 1000 MW-hr of thermal energy was deposited in the site, causing temperature changes 100 0 C near the canisters, and about 5 0 in the tunnels. More than 900 channels of geotechnical, seismological, and test status data were recorded on nearly continuous basis for about 3-1/2 years, ending in September 1983. Most geotechnical instrumentation was known to be temperature sensitive, and thus would require temperature compensation before interpretation. Accordingly, a 10-in. reel of digital tape was off-loaded and shipped to Livermore every 4 to 8 weeks, where the data were verified, organized into 45 one-million-word files, and temperature corrected. The purpose of this report is to document the receipt and processing of the data by LLNL Livermore personnel, present facts about the history of the instruments which may be important to the interpretation of the data, present the data themselves in graphical form for each instrument over its operating lifetime, document the forms and locations in which the data will be archived, and offer the data to the geotechnical community for future use in understanding and predicting the effects of the storage of heat-generating waste in hard rocks such as granite

  13. Recent progress in competitive intelligence, competitive technical intelligence and knowledge management

    Directory of Open Access Journals (Sweden)

    Dou Henri

    2011-04-01

    Full Text Available This paper discusses the role of competitive intelligence and knowledge management to create, maintain and sustain competitive advantages. The triple helix model, based on the integration of the public sector (government, business models (private corporations and universities to promote innovation is examined. Research trends in competitive intelligence are presented. It concludes that the systematic use of the technology monitoring should support the comparison between various business models of companies that hold the market best practices and form a basis to knowledge for the decision making process and strategies development.

  14. DEVELOPMENT OF AN INTEGRATED APPROACH OF QUALITY MANAGEMENT IN DIFFICULT TECHNICAL PROCESSES

    Directory of Open Access Journals (Sweden)

    Victor NORDIN

    2015-01-01

    Full Text Available The article presents the results of studies conducted in a company manufacturing aluminium forgings for the automotive industry. The aim of the research was to identify the defects which form during the production process as well as the locations and causes of their occurrence. Selected quality management tools were used in the process. Based on the FMEA and the costs generated by the identified defects, a hierarchy of them was created for the company along with a proposal of improvements in case of the most significant ones in order to reduce their number and increase the detec-tion efficiency.

  15. Technical Aspects of Interfacing MUMPS to an External SQL Relational Database Management System

    Science.gov (United States)

    Kuzmak, Peter M.; Walters, Richard F.; Penrod, Gail

    1988-01-01

    This paper describes an interface connecting InterSystems MUMPS (M/VX) to an external relational DBMS, the SYBASE Database Management System. The interface enables MUMPS to operate in a relational environment and gives the MUMPS language full access to a complete set of SQL commands. MUMPS generates SQL statements as ASCII text and sends them to the RDBMS. The RDBMS executes the statements and returns ASCII results to MUMPS. The interface suggests that the language features of MUMPS make it an attractive tool for use in the relational database environment. The approach described in this paper separates MUMPS from the relational database. Positioning the relational database outside of MUMPS promotes data sharing and permits a number of different options to be used for working with the data. Other languages like C, FORTRAN, and COBOL can access the RDBMS database. Advanced tools provided by the relational database vendor can also be used. SYBASE is an advanced high-performance transaction-oriented relational database management system for the VAX/VMS and UNIX operating systems. SYBASE is designed using a distributed open-systems architecture, and is relatively easy to interface with MUMPS.

  16. The development of a learning management system for dental radiology education: A technical report.

    Science.gov (United States)

    Chang, Hee-Jin; Symkhampha, Khanthaly; Huh, Kyung-Hoe; Yi, Won-Jin; Heo, Min-Suk; Lee, Sam-Sun; Choi, Soon-Chul

    2017-03-01

    This study was conducted to suggest the development of a learning management system for dental radiology education using the Modular Object-Oriented Dynamic Learning Environment (Moodle). Moodle is a well-known and verified open-source software-learning management system (OSS-LMS). The Moodle software was installed on a server computer and customized for dental radiology education. The system was implemented for teaching undergraduate students to diagnose dental caries in panoramic images. Questions were chosen that could assess students' diagnosis ability. Students were given several questions corre-sponding to each of 100 panoramic images. The installation and customization of Moodle was feasible, cost-effective, and time-saving. By having students answer questions repeatedly, it was possible to train them to examine panoramic images sequentially and thoroughly. Based on its educational efficiency and efficacy, the adaptation of an OSS-LMS in dental school may be highly recommended. The system could be extended to continuing education for dentists. Further studies on the objective evaluation of knowledge acquisition and retention are needed.

  17. Technical aspects regarding the management of radioactive waste from decommissioning of nuclear facilities

    International Nuclear Information System (INIS)

    Dragolici, F.; Turcanu, C.N.; Rotarescu, Gh.; Paunica, I.

    2002-01-01

    The proper application of the nuclear techniques and technologies in Romania started in 1957 with the commissioning of the VVR-S Research Reactor at IFIN-HH-Magurele. During the past 40 years, this reactor was used for thousands of nuclear applications with extremely diverse profiles (research, biology, medicine, education, agriculture, transport, all types of industry) which used radioactive sources in their activity and produced radioactive waste. The Radioactive Waste Treatment Plant (STDR) at IFIN-HH was constructed in collaboration with companies from the United Kingdom and became operational in 1975. It was the only authorized and specialized institution for the management of non-fuel cycle radioactive waste in Romania. Using the concepts existing in the 1980's concerning the final disposal of the low and intermediate level radioactive wastes, and applying internal standards and international recommendations, the National Repository for Low and Intermediate Radioactive Waste (DNDR) was built in 1985 in Baita, Bihor county and placed into operation. Therefore, through the construction and operation of the treatment and final disposal capabilities, Romania has solved the management of the low and intermediate level radioactive waste while providing for the protection of the people and environment. (author)

  18. The technical requirements concerning severe accident management in nuclear power plants

    International Nuclear Information System (INIS)

    Okamoto, Koji; Sugiyama, Tomoyuki; Kamata, Shinya

    2014-01-01

    The Great East Japan Earthquake with a magnitude of 9.0 (The 2011 off the Pacific coast of Tohoku Earthquake) occurred on March 11, 2011, and the beyond design-basis tsunami descended on the Fukushima Daiichi Nuclear Power Plant by the earthquake. Eventually, the core cooling systems of the units 1, 2 and 3 could not operate stably, they all suffered severe accident, and hydrogen explosions were triggered in the reactor buildings of units 1, 3 and 4. In the light of these circumstances, Atomic Energy Society of Japan (AESJ) decided to establish a standard that consolidates the concept of maintaining and improving severe accident management. In the SAM standard, the combination of hardware and software measures based on the risk assessment enables a scientific and rational approach to apply to scenarios of various severe accidents including low-frequency, high-impact events, and assures safety with functionality and flexibility. The SAM standard is already established in March, 2014. After publication of the SAM standard, with regard to effectiveness assessment for accident management and treatment of the uncertainty of severe accident analysis code, for example, the detailed guideline will be prepared as appendices of the standard. (author)

  19. Model-based system engineering approach for the Euclid mission to manage scientific and technical complexity

    Science.gov (United States)

    Lorenzo Alvarez, Jose; Metselaar, Harold; Amiaux, Jerome; Saavedra Criado, Gonzalo; Gaspar Venancio, Luis M.; Salvignol, Jean-Christophe; Laureijs, René J.; Vavrek, Roland

    2016-08-01

    In the last years, the system engineering field is coming to terms with a paradigm change in the approach for complexity management. Different strategies have been proposed to cope with highly interrelated systems, system of systems and collaborative system engineering have been proposed and a significant effort is being invested into standardization and ontology definition. In particular, Model Based System Engineering (MBSE) intends to introduce methodologies for a systematic system definition, development, validation, deployment, operation and decommission, based on logical and visual relationship mapping, rather than traditional 'document based' information management. The practical implementation in real large-scale projects is not uniform across fields. In space science missions, the usage has been limited to subsystems or sample projects with modeling being performed 'a-posteriori' in many instances. The main hurdle for the introduction of MBSE practices in new projects is still the difficulty to demonstrate their added value to a project and whether their benefit is commensurate with the level of effort required to put them in place. In this paper we present the implemented Euclid system modeling activities, and an analysis of the benefits and limitations identified to support in particular requirement break-down and allocation, and verification planning at mission level.

  20. The development of a learning management system for dental radiology education: A technical report

    International Nuclear Information System (INIS)

    Chang, Hee Jin; Huh, Kyung Hoe; Yi, Won Jin; Heo, Min Suk; Lee, Sam Sun; Choi, Soon Chul; Symkhampha, Khanthaly

    2017-01-01

    This study was conducted to suggest the development of a learning management system for dental radiology education using the Modular Object-Oriented Dynamic Learning Environment (Moodle). Moodle is a well-known and verified open-source software-learning management system (OSS-LMS). The Moodle software was installed on a server computer and customized for dental radiology education. The system was implemented for teaching undergraduate students to diagnose dental caries in panoramic images. Questions were chosen that could assess students' diagnosis ability. Students were given several questions corresponding to each of 100 panoramic images. The installation and customization of Moodle was feasible, cost-effective, and time-saving. By having students answer questions repeatedly, it was possible to train them to examine panoramic images sequentially and thoroughly. Based on its educational efficiency and efficacy, the adaptation of an OSS-LMS in dental school may be highly recommended. The system could be extended to continuing education for dentists. Further studies on the objective evaluation of knowledge acquisition and retention are needed