WorldWideScience

Sample records for experiment management system

  1. Petascale system management experiences.

    Energy Technology Data Exchange (ETDEWEB)

    Desai, N.; Bradshaw, R.; Lueninghoener, C.; Cherry, A.; Coghlan, S.; Scullin, W. (LCF); ( MCS)

    2008-01-01

    National Laboratory, and a 504 TF Opteron-based system has been deployed at Texas Advanced Computing Center (TACC). Intrepid is comprised of 40,960 nodes with a total of 163,840 cores. While systems like these are uncommon now, we expect them to become more widespread in the coming years. The scale of these large systems impose several requirements upon system architecture. The need for scalability is obvious, however, power efficiency and density constraints have become increasingly important in recent years. At the same time, because the size of administrative staff cannot grow linearly with the system size, more efficient system management techniques are needed. In this paper we will describe our experiences administering Intrepid. Over the last year, we have experienced a number of interesting challenges in this endeavor. Our initial expectation was for scalability to be the dominant system issue. This expectation was not accurate. Several issues expected to have minor impact have played a much greater role in system operations. Debugging, due to the large numbers of components used in scalable system operations, has become a much more difficult endeavor. The system has a sophisticated monitoring system, however, the analysis of this data has been problematic. These issues are not specific to HPC workloads in any way, so we expect them to be of general interest. This paper consists of three major parts. First, we will provide a detailed overview of several important aspects of Intrepid's hardware and software. In this, we will highlight aspects that have featured prominently in our system management experiences. Next, we will describe our administration experiences in detail. Finally, we will draw some conclusions based on these experiences. In particular, we will discuss the implications for the non-HPC world, system managers, and system software developers.

  2. Management system for the SND experiments

    International Nuclear Information System (INIS)

    Pugachev, K.; Korol, A.

    2017-01-01

    A new management system for the SND detector experiments (at VEPP-2000 collider in Novosibirsk) is developed. We describe here the interaction between a user and the SND databases. These databases contain experiment configuration, conditions and metadata. The new system is designed in client-server architecture. It has several logical layers corresponding to the users roles. A new template engine is created. A web application is implemented using Node.js framework. At the time the application provides: showing and editing configuration; showing experiment metadata and experiment conditions data index; showing SND log (prototype).

  3. Management system for the SND experiments

    Science.gov (United States)

    Pugachev, K.; Korol, A.

    2017-09-01

    A new management system for the SND detector experiments (at VEPP-2000 collider in Novosibirsk) is developed. We describe here the interaction between a user and the SND databases. These databases contain experiment configuration, conditions and metadata. The new system is designed in client-server architecture. It has several logical layers corresponding to the users roles. A new template engine is created. A web application is implemented using Node.js framework. At the time the application provides: showing and editing configuration; showing experiment metadata and experiment conditions data index; showing SND log (prototype).

  4. Experiment Management System for the SND Detector

    Science.gov (United States)

    Pugachev, K.

    2017-10-01

    We present a new experiment management system for the SND detector at the VEPP-2000 collider (Novosibirsk). An important part to report about is access to experimental databases (configuration, conditions and metadata). The system is designed in client-server architecture. User interaction comes true using web-interface. The server side includes several logical layers: user interface templates; template variables description and initialization; implementation details. The templates are meant to involve as less IT knowledge as possible. Experiment configuration, conditions and metadata are stored in a database. To implement the server side Node.js, a modern JavaScript framework, has been chosen. A new template engine having an interesting feature is designed. A part of the system is put into production. It includes templates dealing with showing and editing first level trigger configuration and equipment configuration and also showing experiment metadata and experiment conditions data index.

  5. Electronic journal management systems experiences from the field

    CERN Document Server

    Ives, Gary W

    2013-01-01

    Discover how to manage your library's electronic journals?with tips from those who've already met the challenge!The explosive growth of electronic journals presents unique challenges for libraries. Electronic Journal Management Systems: Experiences from the Field comprehensively examines these complex topics, including explanations of the automated systems libraries have developed or adopted, licensing issues, and the provision of access to electronic journals. Respected library professionals discuss their own experiences in the implementation and use of electronic journal management systems,

  6. Requirements of a Web-based experiment management system.

    Science.gov (United States)

    Jakobovits, R; Soderland, S G; Taira, R K; Brinkley, J F

    2000-01-01

    Recent advances in tools for scientific data acquisition, visualization, and analysis have lead to growing information management problems for medical research laboratories. An exponential increase in the volume of data, combined with a proliferation of heterogeneous formats and autonomous systems, has driven the need for flexible and powerful Experiment Management Systems (EMS). This paper provides a detailed analysis of the informatics requirements of an EMS, and proposes a new type of middleware called an EMS-Building Environment (EMSBE), which enables the rapid development of web-based systems for managing laboratory data and workflow. We describe the Web-Interfacing Respository Manager (WIRM), an open-source application server for building customizable experiment management systems. WIRM is being used to manage several ongoing experiments, including a natural language processor of radiological findings, and an interdisciplinary project for studying brain function.

  7. A review of experiments comparing systems of grazing management ...

    African Journals Online (AJOL)

    Experiments comparing different systems of grazing management on natural pastures in various parts of the world are reviewed. In experiments in which various rotational systems were tested against continuous grazing, fewer than half revealed pasture improvement relative to continuous grazing. In the majority of ...

  8. Experiences with the new ATLAS Distributed Data Management System

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00214543; The ATLAS collaboration

    2016-01-01

    The ATLAS Distributed Data Management (DDM) system has evolved drastically in the last two years with the Rucio software fully replacing the previous system before the start of LHC Run-2. The ATLAS DDM system manages now more than 200 petabytes spread on 130 storage sites and can handle file transfer rates of up to 30Hz. In this talk, we discuss our experience acquired in developing, commissioning, running and maintaining such a large system. First, we describe the general architecture of the system, our integration with external services like the WLCG File Transfer Service and the evolution of the system over its first year of production. Then, we show the performance of the system, describe the integration of new technologies such as object stores, and outline future developments which mainly focus on performance and automation. Finally we discuss the long term evolution of ATLAS data management.

  9. Experiences with Learning Management Systems in 113 European Institutions

    Directory of Open Access Journals (Sweden)

    Morten Flate Paulsen

    2003-10-01

    Full Text Available This article presents the major findings from six regional analyses conducted within the framework of the European Web-edu project (http://www.nettskolen.com/in_english/webedusite/index.html. It analyses the experiences of European institutions with the Learning Management Systems that they have purchased or developed themselves. Data was collected from in-depth interviews with 113 European experts, usually the systems managers in the institutions, in 17 countries. The analyses of the interviews revealed as many as 52 different commercial and 35 self-developed LMS systems. The article presents the data from these interviews and includes a series of important findings from the study. One conclusion is that there is a host of commercial and self-developed systems that seem to work satisfactorily in various educational institutions throughout Europe. The systems are not able to handle all the functions the institutions want, and they can be improved in many ways. But most systems encountered in the analyses seem to be good enough for handling online education successfully. Another conclusion is that the European market is not dominated by the American LMS systems. In countries that do not use English as the first language, locally developed LMS systems have successfully ousted the American products. Remarkably, a large number of the LMS systems used in Europe are commercial systems developed locally, or self-developed systems built by the institutions.

  10. Saudi Aramco experience towards establishing Pipelines Integrity Management System (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    Al-Ahmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-07-01

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  11. Saudi Aramco experience towards establishing Pipelines Integrity Management Systems (PIMS)

    Energy Technology Data Exchange (ETDEWEB)

    AlAhmari, Saad A. [Saudi Aramco, Dhahran (Saudi Arabia)

    2009-12-19

    Saudi Aramco pipelines network transports hydrocarbons to export terminals, processing plants and domestic users. This network faced several safety and operational-related challenges that require having a more effective Pipelines Integrity Management System (PIMS). Therefore Saudi Aramco decided to develop its PIMS on the basis of geographical information system (GIS) support through different phases, i.e., establishing the integrity management framework, risk calculation approach, conducting a gap analysis toward the envisioned PIMS, establishing the required scope of work, screening the PIMS applications market, and selecting suitable tools that satisfy expected deliverables, and implement PIMS applications. Saudi Aramco expects great benefits from implementing PIMS, e.g., enhancing safety, enhancing pipeline network robustness, optimizing inspection and maintenance expenditures, and facilitating pipeline management and the decision-making process. Saudi Aramco's new experience in adopting PIMS includes many challenges and lessons-learned associated with all of the PIMS development phases. These challenges include performing the gap analysis, conducting QA/QC sensitivity analysis for the acquired data, establishing the scope of work, selecting the appropriate applications and implementing PIMS. (author)

  12. Identifying User Experience Goals for Interactive Climate Management Business Systems

    DEFF Research Database (Denmark)

    Clemmensen, Torkil; Barlow, Stephanie

    2013-01-01

    of mobile phones or e-commerce websites. In contrast, this empirical paper provides an example of how to capture user experience in work contexts and with a qualitative methodology. We present a model of the essence of the emotional user experience of interactive climate management. Then we suggest......This paper presents findings from interpretative phenomenological interviews about the user experience of interactive climate management with six growers and crop consultants. The focus of user experience research has been on quantitative studies of consumers’ initial usage experiences, for example...... interpretations of these experiences in the forms of nomological networks of emotions by expanding the model for each of three main factors. In conclusion, the findings for two main stakeholder groups are reported in a user experience target table, which can be the basis for future research on user experience...

  13. Identifying User Experience Goals for Interactive Climate Management Business Systems

    DEFF Research Database (Denmark)

    Clemmensen, Torkil; Barlow, Stephanie

    2013-01-01

    This paper presents findings from interpretative phenomenological interviews about the user experience of interactive climate management with six growers and crop consultants. The focus of user experience research has been on quantitative studies of consumers’ initial usage experiences, for example...... of mobile phones or e-commerce websites. In contrast, this empirical paper provides an example of how to capture user experience in work contexts and with a qualitative methodology. We present a model of the essence of the emotional user experience of interactive climate management. Then we suggest...... interpretations of these experiences in the forms of nomological networks of emotions by expanding the model for each of three main factors. In conclusion, the findings for two main stakeholder groups are reported in a user experience target table, which can be the basis for future research on user experience...

  14. A Conditions Data Management System for HEP Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Laycock, P. J. [CERN; Dykstra, D. [Fermilab; Formica, A. [Saclay; Govi, G. [Fermilab; Pfeiffer, A. [CERN; Roe, S. [CERN; Sipos, R. [Eotvos U.

    2017-01-01

    Conditions data infrastructure for both ATLAS and CMS have to deal with the management of several Terabytes of data. Distributed computing access to this data requires particular care and attention to manage request-rates of up to several tens of kHz. Thanks to the large overlap in use cases and requirements, ATLAS and CMS have worked towards a common solution for conditions data management with the aim of using this design for data-taking in Run 3. In the meantime other experiments, including NA62, have expressed an interest in this cross- experiment initiative. For experiments with a smaller payload volume and complexity, there is particular interest in simplifying the payload storage. The conditions data management model is implemented in a small set of relational database tables. A prototype access toolkit consisting of an intermediate web server has been implemented, using standard technologies available in the Java community. Access is provided through a set of REST services for which the API has been described in a generic way using standard Open API specications, implemented in Swagger. Such a solution allows the automatic generation of client code and server stubs and further allows changes in the backend technology transparently. An important advantage of using a REST API for conditions access is the possibility of caching identical URLs, addressing one of the biggest challenges that large distributed computing solutions impose on conditions data access, avoiding direct DB access by means of standard web proxy solutions.

  15. A Conditions Data Management System for HEP Experiments

    CERN Document Server

    Laycock, Paul; The ATLAS collaboration

    2017-01-01

    Conditions data infrastructure for both ATLAS and CMS have to deal with the management of several Terabytes of data. Distributed computing access to this data requires particular care and attention to manage request-rates of up to several tens of kHz. Thanks to the large overlap in use cases and requirements, ATLAS and CMS have worked towards a common solution for conditions data management with the aim of using this design for data-taking in Run 3. In the meantime other experiments, including NA62, have expressed an interest in this cross-experiment initiative. For experiments with a smaller payload volume and complexity, there is particular interest in simplifying the payload storage. The conditions data management model is implemented in a small set of relational database tables. A prototype access toolkit consisting of an intermediate web server has been implemented, using standard technologies available in the Java community. Access is provided through a set of REST services for which the API has been de...

  16. Management Experiences

    Directory of Open Access Journals (Sweden)

    Gheorghe Popovici

    2016-12-01

    Full Text Available The paper presents the results of the survey about the changes in modern management, identified from the experience of Romanian managers. By this online study one presents both the obstacles encountered and the recommendations for such a type of management that the present and future mangers must take into account. What motivated the respondent Romanian managers most to open their own business is the independence it offered them. They work in the field they have liked since they were young. The second reason was the perspective to have an additional income from the business development. The third argument in favour of opening a business is the possibility to assure the balance between personal life and career.

  17. File-Metadata Management System for the LHCb Experiment

    CERN Document Server

    Cioffi, C

    2004-01-01

    The LHCb experiment needs to store all the information about the datasets and their processing history of recorded data resulting from particle collisions at the LHC collider at CERN as well as of simulated data. To achieve this functionality a design based on data warehousing techniques was chosen, where several user-services can be implemented and optimized individually without losing functionality nor performance. This approach results in an experiment- independent and flexible system. It allows fast access to the catalogue of available data, to detailed history information and to the catalogue of data replicas. Queries can be made based on these three sets of information. A flexible underlying database schema allows the implementation and evolution of these services without the need to change the basic database schema. The consequent implementation of interfaces based on XML-RPC allows to access and to modify the stored information using a well defined encapsulating API.

  18. Software releases management for TDAQ system in ATLAS experiment

    CERN Document Server

    Kazarov, A; The ATLAS collaboration; Hauser, R; Soloviev, I

    2010-01-01

    ATLAS is a general-purpose experiment in high-energy physics at Large Hadron Collider at CERN. ATLAS Trigger and Data Acquisition (TDAQ) system is a distributed computing system which is responsible for transferring and filtering the physics data from the experiment to mass-storage. TDAQ software is developed since 1998 by a team of few dozens developers. It is used for integration of all ATLAS subsystem participating in data-taking, providing framework and API for building the s/w pieces of TDAQ system. It is currently composed of more then 200 s/w packages which are available for ATLAS users in form of regular software releases. The s/w is available for development on a shared filesystem, on test beds and it is deployed to the ATLAS pit where it is used for data-taking. The paper describes the working model, the policies and the tools which are used by s/w developers and s/w librarians in order to develop, release, deploy and maintain the TDAQ s/w for the long period of development, commissioning and runnin...

  19. Systems and software variability management concepts, tools and experiences

    CERN Document Server

    Capilla, Rafael; Kang, Kyo-Chul

    2013-01-01

    The success of product line engineering techniques in the last 15 years has popularized the use of software variability as a key modeling approach for describing the commonality and variability of systems at all stages of the software lifecycle. Software product lines enable a family of products to share a common core platform, while allowing for product specific functionality being built on top of the platform. Many companies have exploited the concept of software product lines to increase the resources that focus on highly differentiating functionality and thus improve their competitiveness

  20. Experience of health-system pharmacy administration residents in a longitudinal human resource management program.

    Science.gov (United States)

    Amerine, Lindsey B Poppe; Granko, Robert P; Savage, Scott W; Daniels, Rowell; Eckel, Stephen F

    2014-12-15

    The experience of health-system pharmacy administration (HSPA) residents in a longitudinal human resource (HR) management program is described. The subsequent benefits to the residents, department, and profession are also discussed. Postgraduate year 2 HSPA residents at an academic medical center desired more responsibility for managing an operational area. To this end, a program was created in which these residents directly manage a small group of pharmacy technicians and report to a clinical manager or assistant director with oversight responsibility. These "resident managers" are responsible, under the direction of the area's clinical manager, for the personnel, schedule, time and attendance, and HR activities of the area. Resident managers have led and sustained operational improvement projects in their areas. In addition to providing learning experiences to residents, the HSPA residency program has also improved the operations of the areas in which these residents work. Benefits to the residents include conducting annual performance evaluations for employees with whom they have a relationship as it is a task every administrator completes. Resident managers at UNC have consistently stated that this longitudinal HR experience is one of the most rewarding and most challenging experiences offered in the two-year HSPA residency. The involvement of HSPA residents in longitudinal management responsibilities furthers residents' leadership success by providing trained managers who are ready to immerse themselves into practice postresidency, having employee engagement and HR skills as well as experiences with leading operational improvements. A longitudinal HR management experience was successfully incorporated into an HSPA residency combined Master of Science degree program. Copyright © 2014 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  1. Principal Experiences with Crisis Management Professional Development, Collaboration, and Implementation of the National Incident Management System Phases of Emergency Management

    Science.gov (United States)

    Naradko, Anthony M.

    2017-01-01

    The purpose of this qualitative single-subject case study was to identify the elements critical to crisis management professional development for school principals; the factors influencing the implementation of the National Incident Management System Phases of Emergency Management (2010) for principals; and the necessary elements for fostering…

  2. Use of Willows in Evapotranspirative Systems for Onsite Wastewater Management – Theory and Experiences from Denmark

    DEFF Research Database (Denmark)

    Brix, Hans; Arias, Carlos Alberto

    2011-01-01

    Evapotranspiration (ET) is a method of onsite wastewater treatment and disposal that is an alternative to conventional soil absorption systems, particularly for sites where protecting surface water and ground water is essential or where soil infiltration is not possible. One of the most important...... aspects of ET systems is their ability to evapotranspire all of the sewage discharged into the systems and the rain falling onto the systems. On an annual basis the ET should equal the amount of wastewater discharged into the system plus the amount of precipitation falling onto the system. Part......, their design, construction and management as well as operational experience are described....

  3. Use of willows in evapotranspirative systems for onsite wastewater management – theory and experiences from Denmark

    DEFF Research Database (Denmark)

    Brix, Hans; Arias, Carlos Alberto

    2011-01-01

    Evapotranspiration (ET) is a method of onsite wastewater treatment and disposal that is an alternative to conventional soil absorption systems, particularly for sites where protecting surface water and ground water is essential or where soil infiltration is not possible. One of the most important...... aspects of ET systems is their ability to evapotranspire all of the sewage discharged into the systems and the rain falling onto the systems. On an annual basis the ET should equal the amount of wastewater discharged into the system plus the amount of precipitation falling onto the system. Part......, their design, construction and management as well as operational experience are described....

  4. Using Facebook as a Learning Management System: Experiences of Pre-Service Teachers

    Science.gov (United States)

    Kalelioglu, Filiz

    2017-01-01

    The purpose of this study was to examine students' experiences using Facebook as a learning management system during a course. The study participants were 18 junior education faculty students attending a compulsory distance education undergraduate course delivered by the Computer Education and Instructional Technology Department at a university in…

  5. Self managing experiment resources

    International Nuclear Information System (INIS)

    Stagni, F; Ubeda, M; Charpentier, P; Tsaregorodtsev, A; Romanovskiy, V; Roiser, S; Graciani, R

    2014-01-01

    Within this paper we present an autonomic Computing resources management system, used by LHCb for assessing the status of their Grid resources. Virtual Organizations Grids include heterogeneous resources. For example, LHC experiments very often use resources not provided by WLCG, and Cloud Computing resources will soon provide a non-negligible fraction of their computing power. The lack of standards and procedures across experiments and sites generated the appearance of multiple information systems, monitoring tools, ticket portals, etc... which nowadays coexist and represent a very precious source of information for running HEP experiments Computing systems as well as sites. These two facts lead to many particular solutions for a general problem: managing the experiment resources. In this paper we present how LHCb, via the DIRAC interware, addressed such issues. With a renewed Central Information Schema hosting all resources metadata and a Status System (Resource Status System) delivering real time information, the system controls the resources topology, independently of the resource types. The Resource Status System applies data mining techniques against all possible information sources available and assesses the status changes, that are then propagated to the topology description. Obviously, giving full control to such an automated system is not risk-free. Therefore, in order to minimise the probability of misbehavior, a battery of tests has been developed in order to certify the correctness of its assessments. We will demonstrate the performance and efficiency of such a system in terms of cost reduction and reliability.

  6. Aiding the environment: the Australian Development Agency's experience of implementing an environmental management system

    International Nuclear Information System (INIS)

    Keen, Meg; Sullivan, Marjorie

    2005-01-01

    Aid agencies, like commercial businesses, are increasingly concerned with incorporating sound environmental management into their operations. Different approaches are being used to integrate sustainability into development assistance to ensure that environmental impacts are assessed and managed. One approach being used by AusAID, the Australian aid agency, is to implement an environmental management system (EMS) across program and project areas. This paper examines how AusAID has adapted the EMS approach to suit aid agency operations, and some of the lessons from the Australian experience

  7. Experiences in management of production systems of social interest: The case of Corpoc and Furmos foundation

    Directory of Open Access Journals (Sweden)

    Marcela Camacho Montoya

    2013-01-01

    Full Text Available The theories of human development from human capabilities have, as theoretical references, the competencies of affiliation, achievement and power, as well as the analysis of business management. This article aims to compare experiences of productive systems of social interest from an analysis of the particular cases of the Furmos and Corpoc companies. The starting point was a previous project conducted in Corpoc; information was gathered through interviews and work sessions, and the institutions were characterized. It was found that the Corpoc management model is flat associative with a single leader and the Furmos model is a strategic associative partnership management model. Their members depend on the leader with their motivations and achievements, and their projects do not have a management model. Therefore, the lack of a suitable formulation of management models prevents the continuity and success of social production projects in the two institutions.

  8. The usage of the gLite Workload Management System by the LHC experiments

    CERN Document Server

    Sciaba’, A; Miccio, V

    2007-01-01

    The LHC experiments will study the physics of p-p interactions at a centre-of-mass energy of 14 TeV using the LHC accelerator at CERN. The primary purpose of their research is the discovery of the Higgs boson and of new physics at the TeV scale. The LHC experiments are undoubtedly the most demanding communities for the EGEE infrastructure. They have thousands of collaborators who expect to run their physics analyses on the data that will be collected starting from late 2007. It is expected that each experiment will need to run hundreds of thousands of jobs per day, including: event reconstruction from raw data, analysis on reconstructed data, and Monte Carlo simulation. The management of such amounts of jobs is an extremely complicated task and the gLite WMS is being considered as a candidate to perform it. This report describes the experience of the ATLAS and the CMS experiments using the gLite Workload Management System as a tool to submit both simulation and analysis jobs. In fact, this experience has led ...

  9. Bibliography for nuclear criticality accident experience, alarm systems, and emergency management

    International Nuclear Information System (INIS)

    Putman, V.L.

    1995-09-01

    The characteristics, detection, and emergency management of nuclear criticality accidents outside reactors has been an important component of criticality safety for as long as the need for this specialized safety discipline has been recognized. The general interest and importance of such topics receives special emphasis because of the potentially lethal, albeit highly localized, effects of criticality accidents and because of heightened public and regulatory concerns for any undesirable event in nuclear and radiological fields. This bibliography lists references which are potentially applicable to or interesting for criticality alarm, detection, and warning systems; criticality accident emergency management; and their associated programs. The lists are annotated to assist bibliography users in identifying applicable: industry and regulatory guidance and requirements, with historical development information and comments; criticality accident characteristics, consequences, experiences, and responses; hazard-, risk-, or safety-analysis criteria; CAS design and qualification criteria; CAS calibration, maintenance, repair, and testing criteria; experiences of CAS designers and maintainers; criticality accident emergency management (planning, preparedness, response, and recovery) requirements and guidance; criticality accident emergency management experience, plans, and techniques; methods and tools for analysis; and additional bibliographies

  10. Patients' Perceptions and Experiences of a mHealth Diabetes Self-management System.

    Science.gov (United States)

    Georgsson, Mattias; Staggers, Nancy

    2017-03-01

    Chronic diseases, including diabetes, constitute a substantial disease burden around the world. Mobile self-management systems now play a significant and increasingly important role in patients' disease management. Yet, patients' perceptions of these systems after longer-term use are largely unexplored. A random sample of 10 diabetes patients was assessed immediately after they exited a larger, 6-month randomized controlled trial on the use of a mHealth system called Care4Life. This descriptive, exploratory study assessed patients' perceptions and experiences of mHealth using a questionnaire and semistructured interview whose development was guided by the Technology Acceptance Model. Results indicated that patients saw clear benefits in using the technology and had favorable behavioral disease outcomes after using Care4Life. Suggestions for improving the system were highly individual despite the apparent homogeneity of the patient group. The study begins to fill the gap about the longer-term use of mHealth systems in chronic disease management and reflects the significance of individual needs for mHealth systems.

  11. Experience of using an open source clinical trials data management software system in Kenya.

    Science.gov (United States)

    Ngari, Moses M; Waithira, Naomi; Chilengi, Roma; Njuguna, Patricia; Lang, Trudie; Fegan, Greg

    2014-11-26

    Clinical trials data management (CTDM) remains one of the many challenges in running state of the art trials in resource-poor settings since most trials do not allocate, or have available, sufficient resources for CTDM and because of poor internet connectivity. Open-source software like OpenClinica could be a solution in such scenarios. In 2007, the KEMRI-Wellcome Trust Research Programme (KWTRP) adopted OpenClinica (OC) community edition, an open-source software system and we share our experience and lessons learnt since its adoption. We have used OC in three different modes; direct remote data entry from sites through Global System for Mobile Communications (GSM) modems, a centralized data centre approach where all data from paper records were entered at a central location and an off-line approach where data entry was done from a copy of database hosted on a field-site server laptop, then data uploaded to a centralized server later. We have used OC in eleven trials/studies with a cumulative number of participants in excess of 6000. These include large and complex trials, with multiple sites recruiting in different regions of East Africa. In the process, we have developed substantial local capacity through hands-on training and mentorship, which we have now begun to share with other institutions in the region. Our experience demonstrates that an open source data management system to manage trials' data can be utilized to international industry standards in resource-poor countries.

  12. Reaching an entrepreneurial management system of amoebas. A qualitative insight into the European experiences

    Directory of Open Access Journals (Sweden)

    Urban Wiesław

    2016-03-01

    Full Text Available The aim of the study is an assessment of the Amoeba Management System (AMS introduction advancements in some European companies. The study takes the practically focused research approach. The approaches, achievements and phases whilst introducing the AMS principles by companies are observed and critically assessed. First insight into the challenges of AMS introduction is taken basing on critical study of the literature output. The scientific studies and managerial publications are taken into consideration. The empirical part of the study is based on the qualitative approach. A multiple case study methodology is employed. The research objects are three companies, one of them operates in Sweden, the next two in Poland. Each of them have different experiences in AMS implementation, they also manifest different management styles and habits. The study demonstrates that AMS is a very prospective management methodology which can support companies in employees commitment during their journey towards operational excellence. The analysis results show different motivations for AMS introduction as well as different development paths, these are harmonized with different management styles in companies and culture occurring in countries. The study is particularly valuable because this is one of the first empirical investigations of AMS implementation in European companies. In the field of theory the study proposes the four level scale for amoebas system maturity. This scale allows to classify companies following AMS principles and, at the same time, this scale is also the kind of path of AMS implementation. The study points out basic tools for companies which support AMS implementation. These tools are already known in management literature, but experience of investigated companies shows that they are fundamental for successful AMS implementation.

  13. Practice of knowledge management for institutes--take the construction of experience feedback system as the example

    International Nuclear Information System (INIS)

    Wu Kaiping

    2014-01-01

    The construction of experience feedback system is an important part and breakthrough point of institutes' knowledge management. It is significant for institutes' design, management, development and innovation. This article introduces the concept of experience feedback for institutes. It also goes details of the content of experience feedback system construction for institutes, including the founding of experience feedback organizational mechanism, the development of experience feedback system, construction of knowledge database system, the construction of knowledge resources, and the appraisal of experience feedback's performance. Furthermore, the recognition and support of leaders, understanding and cooperation of relative departments, and corporation's culture of encouraging knowledge sharing, also are the important guarantees for the good effects of institutes' experience feedback work. (author)

  14. Experience with the gLite Workload Management System in ATLAS Monte Carlo production on LCG

    CERN Document Server

    Campana, S; Sciabá, A; CERN. Geneva. IT Department

    2008-01-01

    The ATLAS experiment has been running continuous simulated events production since more than two years. A considerable fraction of the jobs is daily submitted and handled via the gLite Workload Management System, which overcomes several limitationsof the previous LCG Resource Broker. The gLite WMS has been tested very intensively for the LHC experiments use cases for more than six months, both in terms of performance and reliability. The tests were carried out by the LCG Experiment Integration Support team (in close contact with the experiments) together with the EGEE integration and certification team and the gLite middleware developers. A pragmatic iterative and interactive approach allowed a very quick rollout of fixes and their rapid deployment, together with new functionalities, for the ATLAS production activities. The same approach is being adopted for other middleware components like the gLite and CREAM Computing Elements. In this contribution we will summarize the learning from the gLite WMS testing a...

  15. Unisys' experience in software quality and productivity management of an existing system

    Science.gov (United States)

    Munson, John B.

    1988-01-01

    A summary of Quality Improvement techniques, implementation, and results in the maintenance, management, and modification of large software systems for the Space Shuttle Program's ground-based systems is provided.

  16. Ten years' experience using an integrated workers' compensation management system to control workers' compensation costs.

    Science.gov (United States)

    Bernacki, Edward J; Tsai, Shan P

    2003-05-01

    This work presents 10 years of experience using an Integrated Workers' Compensation Claims Management System that allows safety professionals, adjusters, and selected medical and nursing providers to collaborate in a process of preventing accidents and expeditiously assessing, treating, and returning individuals to productive work. The hallmarks of the program involve patient advocacy and customer service, steerage of injured employees to a small network of physicians, close follow-up, and the continuous dialogue between parties regarding claims management. The integrated claims management system was instituted in fiscal year 1992 servicing a population of approximately 21,000 individuals. The system was periodically refined and by the 2002 fiscal year, 39,000 individuals were managed under this paradigm. The frequency of lost-time and medical claims rate decreased 73% (from 22 per 1000 employees to 6) and 61% (from 155 per 1000 employees to 61), respectively, between fiscal year 1992 and fiscal year 2002. The number of temporary/total days paid per 100 insureds decreased from 163 in fiscal year 1992 to 37 in fiscal year 2002, or 77%. Total workers' compensation expenses including all medical, indemnity and administrative, decreased from $0.81 per $100 of payroll in fiscal year 1992 to $0.37 per $100 of payroll in fiscal year 2002, a 54% decrease. More specifically, medical costs per $100 of payroll decreased 44% (from $0.27 to $0.15), temporary/total, 61% (from $0.18 to $0.07), permanent/partial, 63% (from $0.19 to $0.07) and administrative costs, 48% ($0.16 to $0.09). These data suggests that workers' compensation costs can be reduced over a multi-year period by using a small network of clinically skilled health care providers who address an individual workers' psychological, as well as physical needs and where communication between all parties (e.g., medical care providers, supervisors, and injured employees) is constantly maintained. Furthermore, these results

  17. LHCb: Self managing experiment resources

    CERN Multimedia

    Stagni, F

    2013-01-01

    Within this paper we present an autonomic Computing resources management system used by LHCb for assessing the status of their Grid resources. Virtual Organizations Grids include heterogeneous resources. For example, LHC experiments very often use resources not provided by WLCG and Cloud Computing resources will soon provide a non-negligible fraction of their computing power. The lack of standards and procedures across experiments and sites generated the appearance of multiple information systems, monitoring tools, ticket portals, etc... which nowadays coexist and represent a very precious source of information for running HEP experiments Computing systems as well as sites. These two facts lead to many particular solutions for a general problem: managing the experiment resources. In this paper we present how LHCb, via the DIRAC interware addressed such issues. With a renewed Central Information Schema hosting all resources metadata and a Status System ( Resource Status System ) delivering real time informatio...

  18. ON EXPERIENCE OF THE COLLABORATION AND PROJECT MANAGEMENT INFORMATION SYSTEM PODIO IMPLEMENTATION IN THE MEDICAL UNIVERSITY

    Directory of Open Access Journals (Sweden)

    Andrii V. Semenets

    2014-12-01

    Full Text Available The Information Technologies role in the medical university management is analyzed. The importance of the application of the electronic document management in the medical universities is shown. The implementation capabilities of the electronic document management system within a cloud services are shown. A Podio collaboration and project management cloud service features overview is presented. The methodology of the Podio capabilities usage to the medical university task management solving is developed. An approaches to the Podio Workspaces and Applications development for the faculties collaboration and project management in the departments of the medical universities are presented. The examples of the Podio features usage to the work-flow automation of the information-analytical and hardware and software support departments of the Ternopil State Medical University named after I. Ja. Horbachevsky are shown.

  19. Practice and experience of radiation protection and optimization (ALARA) management system in Daya Bay NPP during the past 10 years

    International Nuclear Information System (INIS)

    Chen Degan; He Yu; Yang Maochun; Gu Jingzhi

    2004-01-01

    With the practice of 10 years safe operation, Daya Bay Nuclear Power Station has established and continuously improved the management system for radiation protection and optimization (ALARA) which contains 3 basic requirements: all workers are trained, all employees are engaged in totally, and work management is implemented for the whole process. At the same time, strong efforts have been made to build the 'infrastructure' as a platform for its effective operation. This article introduces the contents and characteristics of the system and basic experiences of its effective implementation. In order to implement the management system effectively, it is necessary for NPPs to strengthen the responsibility system for radiation protection and the leading role of the radiation protection personnel, especially the role of technical support and supervision during the work with high radiation risk, emphasize the organic combination and actively mutual action with the safe operation management system of the plant, and pay great attention to the formation of safety culture and the experience feedback to ensure the continuous improvement of the management system

  20. Experience of the implementation of quality management system at the joint stock company 'Mashinostroitelny zavod', Electrostal

    International Nuclear Information System (INIS)

    Mezhuev, V.; Tsiboulia, V.; Kiruyshkin, A.; Tchirkov, V.

    2000-01-01

    The paper describes major steps of development and implementation of Quality Management System (QMS) in nuclear fuel fabrication at Joint Stock Company 'Mashinostroitelny zavod', Electrostal, Russian Federation. Special emphasis is paid to the estimation of QMS effectiveness, current impact of QMS implementation on nuclear fuel quality, sales market and directions for further QMS development. (author)

  1. An SME's quality management experience

    International Nuclear Information System (INIS)

    Gorham, B.; Scott, C.K.

    2006-01-01

    Small and medium sized enterprises (SME's) that supply services to nuclear power plants have to meet the station's quality requirements. To improve its quality program, Atlantic Nuclear (an SME) adopted the ISO 9001 standard for its management system. Vendor registrations are then achieved by adding specific elements as required by the clients. This paper discusses the experience, both positive and negative, from implementing and continually improving the quality management program for Atlantic Nuclear, a small nuclear engineering service provider. We also discuss how quality management principles are implemented and embraced by the company. (author)

  2. Learning management system and e-learning tools: an experience of medical students' usage and expectations.

    Science.gov (United States)

    Back, David A; Behringer, Florian; Haberstroh, Nicole; Ehlers, Jan P; Sostmann, Kai; Peters, Harm

    2016-08-20

    To investigate medical students´ utilization of and problems with a learning management system and its e-learning tools as well as their expectations on future developments. A single-center online survey has been carried out to investigate medical students´ (n = 505) usage and perception concerning the learning management system Blackboard, and provided e-learning tools. Data were collected with a standardized questionnaire consisting of 70 items and analyzed by quantitative and qualitative methods. The participants valued lecture notes (73.7%) and Wikipedia (74%) as their most important online sources for knowledge acquisition. Missing integration of e-learning into teaching was seen as the major pitfall (58.7%). The learning management system was mostly used for study information (68.3%), preparation of exams (63.3%) and lessons (54.5%). Clarity (98.3%), teaching-related contexts (92.5%) and easy use of e-learning offers (92.5%) were rated highest. Interactivity was most important in free-text comments (n = 123). It is desired that contents of a learning management system support an efficient learning. Interactivity of tools and their conceptual integration into face-to-face teaching are important for students. The learning management system was especially important for organizational purposes and the provision of learning materials. Teachers should be aware that free online sources such as Wikipedia enjoy a high approval as source of knowledge acquisition. This study provides an empirical basis for medical schools and teachers to improve their offerings in the field of digital learning for their students.

  3. Quality management systems in ART: are they really needed? An Australian clinic's experience.

    Science.gov (United States)

    Warnes, G M; Norman, R J

    2007-02-01

    As assisted reproductive technology (ART) expanded globally, several countries introduced prescribed requirements for treatment and monitoring of outcomes, as well as a licensing or accreditation requirement. While it is common for ART laboratories to be required to have an effective quality control system, the remainder of the clinic is often under less stringent regulation. Furthermore, when treatment conditions are prescribed, the standards tend to be conservative and clinics may choose to establish their own standards. Total quality management systems are now being used by an increasing number of ART clinics. In Australia and New Zealand, it is now a requirement to have a quality management system in order to be accredited and to help meet customer demand for improved delivery of ART services in these two countries.

  4. Experiences in ageing management of electrical system of research reactor Cirus

    International Nuclear Information System (INIS)

    Mathew, Alex; Singh, G.; Singh, B.

    2006-01-01

    CIRUS is 40 MV (thermal) research reactor which was commissioned in 1960. After three decades of operation, detailed ageing assessment of structures, systems and equipments of CIRUS was carried out with the objective of finalizing the plan to refurbish the reactor. As per the plan, extensive refurbishing was carried out between 1997 and 2002 and the reactor became operational on October 30, 2002. Ageing assessment and refurbishing works were carried out on electrical systems of CIRUS during above mentioned period. The electrical system comprises of different sub-systems namely Class-I system and reactor protection system, Class-II system, Class-III systems and Class-IV systems. This paper describes the method followed for ageing assessment of electrical systems of CIRUS as per international guidelines. Details of ageing assessment of each component of the sub-system and the results of the assessment are also given in the paper. Further, the paper describes the various refurbishing works carried out on the electrical systems, particularly on class-IE components towards ageing managements as well as safety upgradations. (author)

  5. Environmental system analysis of waste management. Experiences from applications of the ORWARE model

    Energy Technology Data Exchange (ETDEWEB)

    Bjoerklund, Anna

    2000-11-01

    Waste management has gone through a history of shifting problems, demands, and strategies over the years. In contrast to the long prevailing view that the problem could be solved by hiding or moving it, waste is now viewed as a problem ranging from local to global concern, and as being an integral part of several sectors in society. Decisive for this view has been society's increasing complexity and thus the increasing complexity of waste, together with a general development of environmental consciousness, moving from local focus on point emission sources, to regional and global issues of more complex nature. This thesis is about the development and application ORWARE; a model for computer aided environmental systems analysis of municipal waste management. Its origin is the hypothesis that widened perspectives are needed in waste management decision-making to avoid severe sub-optimisation of environmental performance. With a strong foundation in life cycle assessment (LCA), ORWARE aims to cover the environmental impacts over the entire life cycle of waste management. It also performs substance flow analysis (SFA) calculations at a rather detailed level of the system. Applying ORWARE has confirmed the importance of applying systems perspective and of taking into account site specific differences in analysis and planning of waste management, rather than relying on overly simplified solutions. Some findings can be generalised and used as guidelines to reduce environmental impact of waste management. Recovery of material and energy resources from waste generally leads to net reductions in energy use and environmental impact, because of the savings this brings about in other sectors. Waste treatment with low rate of energy and materials recovery should therefore be avoided. The exact choice of technology however depends on what products can be recovered and how they are used. Despite the complexity of the model and a certain degree of user unfriendliness, involved

  6. The design and implementation of an automated system for logging clinical experiences using an anesthesia information management system.

    Science.gov (United States)

    Simpao, Allan; Heitz, James W; McNulty, Stephen E; Chekemian, Beth; Brenn, B Randall; Epstein, Richard H

    2011-02-01

    Residents in anesthesia training programs throughout the world are required to document their clinical cases to help ensure that they receive adequate training. Current systems involve self-reporting, are subject to delayed updates and misreported data, and do not provide a practicable method of validation. Anesthesia information management systems (AIMS) are being used increasingly in training programs and are a logical source for verifiable documentation. We hypothesized that case logs generated automatically from an AIMS would be sufficiently accurate to replace the current manual process. We based our analysis on the data reporting requirements of the American College of Graduate Medical Education (ACGME). We conducted a systematic review of ACGME requirements and our AIMS record, and made modifications after identifying data element and attribution issues. We studied 2 methods (parsing of free text procedure descriptions and CPT4 procedure code mapping) to automatically determine ACGME case categories and generated AIMS-based case logs and compared these to assignments made by manual inspection of the anesthesia records. We also assessed under- and overreporting of cases entered manually by our residents into the ACGME website. The parsing and mapping methods assigned cases to a majority of the ACGME categories with accuracies of 95% and 97%, respectively, as compared with determinations made by 2 residents and 1 attending who manually reviewed all procedure descriptions. Comparison of AIMS-based case logs with reports from the ACGME Resident Case Log System website showed that >50% of residents either underreported or overreported their total case counts by at least 5%. The AIMS database is a source of contemporaneous documentation of resident experience that can be queried to generate valid, verifiable case logs. The extent of AIMS adoption by academic anesthesia departments should encourage accreditation organizations to support uploading of AIMS-based case

  7. An Integrated Management System (IMS) for JM-1 SLOWPOKE-2 research reactor in Jamaica: experiences in documentation

    Energy Technology Data Exchange (ETDEWEB)

    Warner, T., E-mail: traceyann.warner02@uwimona.edu.jm [Univ. of West Indies, Mona (Jamaica)

    2014-07-01

    Since the first criticality in March 1984, the Jamaica SLOWPOKE-2 research reactor at the University of the West Indies, Mona located in the department of the International Centre for Environmental and Nuclear Sciences (ICENS) has operated for approximately 52% of the lifetime of the existing core configuration. The 20kW pool type research reactor has been primarily used for neutron activation analysis in environmental, agricultural, geochemical, health-related studies and mineral exploration in Jamaica. The involvement of the JM-1 reactor for research and teaching activities has segued into commercial applications which, coupled with the current core conversion programme from HEU to LEU, has demanded the implementation of management systems to satisfy regulatory requirements and assure compliance with internationally defined quality standards. At ICENS, documentation related to the Quality Management System aspect of an Integrated Management System (IMS) is well underway. The quality system will incorporate operational and nuclear safety, training, maintenance, design, utilization, occupational health and safety, quality service, and environmental management for its Nuclear Analytical Laboratory, NAL. The IMS is being designed to meet the requirements of the IAEA GS-R-3 with additional controls from international standards including: ISO/IEC 17025:2005, ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007. This paper reports on the experiences of the documentation process in a low power reactor facility characterized by limited human resource, where innovative mechanisms of system automation and modeling are included to increase productivity and efficiency. (author)

  8. An Integrated Management System (IMS) for JM-1 SLOWPOKE-2 research reactor in Jamaica: experiences in documentation

    International Nuclear Information System (INIS)

    Warner, T.

    2014-01-01

    Since the first criticality in March 1984, the Jamaica SLOWPOKE-2 research reactor at the University of the West Indies, Mona located in the department of the International Centre for Environmental and Nuclear Sciences (ICENS) has operated for approximately 52% of the lifetime of the existing core configuration. The 20kW pool type research reactor has been primarily used for neutron activation analysis in environmental, agricultural, geochemical, health-related studies and mineral exploration in Jamaica. The involvement of the JM-1 reactor for research and teaching activities has segued into commercial applications which, coupled with the current core conversion programme from HEU to LEU, has demanded the implementation of management systems to satisfy regulatory requirements and assure compliance with internationally defined quality standards. At ICENS, documentation related to the Quality Management System aspect of an Integrated Management System (IMS) is well underway. The quality system will incorporate operational and nuclear safety, training, maintenance, design, utilization, occupational health and safety, quality service, and environmental management for its Nuclear Analytical Laboratory, NAL. The IMS is being designed to meet the requirements of the IAEA GS-R-3 with additional controls from international standards including: ISO/IEC 17025:2005, ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007. This paper reports on the experiences of the documentation process in a low power reactor facility characterized by limited human resource, where innovative mechanisms of system automation and modeling are included to increase productivity and efficiency. (author)

  9. Soil and crop management experiments in the Laboratory Biosphere: An analogue system for the Mars on Earth ® facility

    Science.gov (United States)

    Silverstone, S.; Nelson, M.; Alling, A.; Allen, J. P.

    During the years 2002 and 2003, three closed system experiments were carried out in the "Laboratory Biosphere" facility located in Santa Fe, New Mexico. The program involved experimentation of "Hoyt" Soy Beans, (experiment #1) USU Apogee Wheat (experiment #2) and TU-82-155 sweet potato (experiment #3) using a 5.37 m 2 soil planting bed which was 30 cm deep. The soil texture, 40% clay, 31% sand and 28% silt (a clay loam), was collected from an organic farm in New Mexico to avoid chemical residues. Soil management practices involved minimal tillage, mulching, returning crop residues to the soil after each experiment and increasing soil biota by introducing worms, soil bacteria and mycorrhizae fungi. High soil pH of the original soil appeared to be a factor affecting the first two experiments. Hence, between experiments #2 and #3, the top 15 cm of the soil was amended using a mix of peat moss, green sand, humates and pumice to improve soil texture, lower soil pH and increase nutrient availability. This resulted in lowering the initial pH of 8.0-6.7 at the start of experiment #3. At the end of the experiment, the pH was 7.6. Soil nitrogen and phosphorus has been adequate, but some chlorosis was evident in the first two experiments. Aphid infestation was the only crop pest problem during the three experiments and was handled using an introduction of Hyppodamia convergens. Experimentation showed there were environmental differences even in this 1200 cubic foot ecological system facility, such as temperature and humidity gradients because of ventilation and airflow patterns which resulted in consequent variations in plant growth and yield. Additional humidifiers were added to counteract low humidity and helped optimize conditions for the sweet potato experiment. The experience and information gained from these experiments are being applied to the future design of the Mars On Earth ® facility (Silverstone et al., Development and research program for a soil

  10. Empirical guidelines for forest management decision support systems based on the past experiences of the expert's community

    Directory of Open Access Journals (Sweden)

    A.F. Marques

    2013-07-01

    Full Text Available Aim of the study: Decision support systems for forest management (FMDSS have been developed world wide to account for a broad range of forest ecosystems, management goals and organizational frameworks (e.g. the wiki page of the FORSYS project reports 62 existing FMDSSs from 23 countries. The need to enhance the collaboration among this diverse community of developers and users fostered the rise of new group communication processes that could capture useful knowledge from past experiences in order to efficiently provide it to new FMDSS development efforts.Material and methods: This paper presents and tests an exploratory process aiming to identify the empirical guidelines assisting developers and users of FMDSS. This process encompasses aDelphi survey built upon the consolidation of the lessons-learned statements that summarize the past experiences of the experts involved in the FORSYS project. The experts come from 34 countries and have diverse interests, ranging from forest planners, IT developers, social scientists studying participatory planning, and researchers with interests in knowledge management and in quantitative models for forest planning.Main results: The proposed 37 empirical guidelines that group 102 lessons-learned cover a broad range of issues including the DSS development cycle, involvement of the stakeholders, methods, models and knowledge-based techniques in use.Research highlights: These results may be used for improving new FMDSS development processes, teaching and training and further suggest new features of FMDSS and future research topics. Furthermore, the guidelines may constitute a knowledge repository that may be continuously improved by a community of practice.Keywords: Forest management; guidelines; guidelines definition process; lessons learned; decision support systems; system architecture; knowledge management; participatory planning; Delphi.

  11. A comprehensive data acquisition and management system for an ecosystem-scale peatland warming and elevated CO2 experiment

    Science.gov (United States)

    Krassovski, M. B.; Riggs, J. S.; Hook, L. A.; Nettles, W. R.; Hanson, P. J.; Boden, T. A.

    2015-11-01

    Ecosystem-scale manipulation experiments represent large science investments that require well-designed data acquisition and management systems to provide reliable, accurate information to project participants and third party users. The SPRUCE project (Spruce and Peatland Responses Under Climatic and Environmental Change, http://mnspruce.ornl.gov) is such an experiment funded by the Department of Energy's (DOE), Office of Science, Terrestrial Ecosystem Science (TES) Program. The SPRUCE experimental mission is to assess ecosystem-level biological responses of vulnerable, high carbon terrestrial ecosystems to a range of climate warming manipulations and an elevated CO2 atmosphere. SPRUCE provides a platform for testing mechanisms controlling the vulnerability of organisms, biogeochemical processes, and ecosystems to climatic change (e.g., thresholds for organism decline or mortality, limitations to regeneration, biogeochemical limitations to productivity, and the cycling and release of CO2 and CH4 to the atmosphere). The SPRUCE experiment will generate a wide range of continuous and discrete measurements. To successfully manage SPRUCE data collection, achieve SPRUCE science objectives, and support broader climate change research, the research staff has designed a flexible data system using proven network technologies and software components. The primary SPRUCE data system components are the following: 1. data acquisition and control system - set of hardware and software to retrieve biological and engineering data from sensors, collect sensor status information, and distribute feedback to control components; 2. data collection system - set of hardware and software to deliver data to a central depository for storage and further processing; 3. data management plan - set of plans, policies, and practices to control consistency, protect data integrity, and deliver data. This publication presents our approach to meeting the challenges of designing and constructing an

  12. A plant resource and experiment management system based on the Golm Plant Database as a basic tool for omics research

    Directory of Open Access Journals (Sweden)

    Selbig Joachim

    2008-05-01

    Full Text Available Abstract Background For omics experiments, detailed characterisation of experimental material with respect to its genetic features, its cultivation history and its treatment history is a requirement for analyses by bioinformatics tools and for publication needs. Furthermore, meta-analysis of several experiments in systems biology based approaches make it necessary to store this information in a standardised manner, preferentially in relational databases. In the Golm Plant Database System, we devised a data management system based on a classical Laboratory Information Management System combined with web-based user interfaces for data entry and retrieval to collect this information in an academic environment. Results The database system contains modules representing the genetic features of the germplasm, the experimental conditions and the sampling details. In the germplasm module, genetically identical lines of biological material are generated by defined workflows, starting with the import workflow, followed by further workflows like genetic modification (transformation, vegetative or sexual reproduction. The latter workflows link lines and thus create pedigrees. For experiments, plant objects are generated from plant lines and united in so-called cultures, to which the cultivation conditions are linked. Materials and methods for each cultivation step are stored in a separate ACCESS database of the plant cultivation unit. For all cultures and thus every plant object, each cultivation site and the culture's arrival time at a site are logged by a barcode-scanner based system. Thus, for each plant object, all site-related parameters, e.g. automatically logged climate data, are available. These life history data and genetic information for the plant objects are linked to analytical results by the sampling module, which links sample components to plant object identifiers. This workflow uses controlled vocabulary for organs and treatments. Unique

  13. An expert system for fault management assistance on a space sleep experiment

    Science.gov (United States)

    Atamer, A.; Delaney, M.; Young, L. R.

    2002-01-01

    The expert system, Principal Investigator-in-a-box, or [PI], was designed to assist astronauts or other operators in performing experiments outside their expertise. Currently, the software helps astronauts calibrate instruments for a Sleep and Respiration Experiment without contact with the investigator on the ground. It flew on the Space Shuttle missions STS-90 and STS-95. [PI] displays electrophysiological signals in real time, alerts astronauts via the indicator lights when a poor signal quality is detected, and advises astronauts how to restore good signal quality. Thirty subjects received training on the sleep instrumentation and the [PI] interface. A beneficial effects of [PI] and training reduced troubleshooting time. [PI] benefited subjects on the most difficult scenarios, even though its lights were not 100% accurate. Further, questionnaires showed that most subjects preferred monitoring waveforms with [PI] assistance rather than monitoring waveforms alone. This study addresses problems of complex troubleshooting and the extended time between training and execution that is common to many human operator situations on earth such as in power plant operation, and marine exploration.

  14. A systems approach to the management of large projects: Review of NASA experience with societal implications

    Science.gov (United States)

    Vaccaro, M. J.

    1973-01-01

    The application of the NASA type management approach to achieve objectives in other fields is considered. The NASA management outlook and the influences of the NASA environment are discussed along with project organization and management, and applications to socio-economic projects.

  15. Experience of quality management system in a clinical laboratory in Nigeria

    Directory of Open Access Journals (Sweden)

    Rosemary A. Audu

    2012-10-01

    Description: In 2005, two personnel from the HVL spent time studying quality systems in a certified clinical laboratory in Dakar, Senegal. Following this peer-to-peer technical assistance, several training sessions were undertaken by HVL staff, a baseline assessment was conducted, and processes were established. The HVL has monitored its quality indicators and conducted internal and external audits; these analyses (from 2007 to 2009 are presented herein. Lessons learned: Although there was improvement in the pre-analytical and analytical indicators analysed and although data-entry errors decreased in the post-analytical process, the delay in returning laboratory test results increased significantly. There were several factors identified as causes for this delay and all of these have now been addressed except for an identified need for automation of some high-volume assays (currently being negotiated. Internal and external audits showed a trend of increasing non-conformities which could be the result of personnel simply becoming lax over time. Application for laboratory accreditation, however, could provide the renewed vigour needed to correct these non-conformities. Recommendation: This experience shows that sustainability of the QMS at present is a cause for concern. However, the tiered system of accreditation being developed by WHO–Afro may act as a driving force to preserve the spirit of continual improvement.

  16. Financial management information systems 25 years of World Bank experience on what works and what doesn't

    CERN Document Server

    Dener, Cem; Dorotinsky, William Leslie

    2011-01-01

    Since 1984, the World Bank has financed 87 Financial Management Information System (FMIS) projects in 51 countries totaling over US 2.2 billion, of which US 938 million was for FMIS related information and communication technology (ICT) solutions. This study presents the World Bank?s experience with these investment operations to share the achievements and challenges observed, and provide guidance for improving the performance of future projects. The report is structured according to four overarching questions:?What historical patterns emerge from World Bank financed Treasury/FMIS projects?Thi

  17. User experience goals for interactive climate management systems in green houses

    OpenAIRE

    Clemmensen, Torkil; Barlow, Stephanie

    2012-01-01

    This paper presents findings from interpretative phenomenological interviews about the UX of interactive climate management with six growers and crop consultants. A model of UX of interactive climate management is presented. The findings are reported in a UX target table, which can be the basis for future research on UX at work in this domain.

  18. Improving Healthcare through Lean Management: Experiences from the Danish healthcare system

    DEFF Research Database (Denmark)

    Edwards, Kasper; Nielsen, Anders Paarup

    The ideas and principles from lean management are now widely being adopted within the healthcare sector. The analysis in this paper shows that organizations within healthcare most often only implement a limited set of tools and methods from the lean tool-box. Departing from a theoretical analysis...... of the well-known and universal lean management principles in the context of the healthcare this paper will attempt to formulate and test four hypotheses about possible barriers to the successful implementation of lean management in healthcare. The first hypothesis states that lean management in healthcare...... still is in its infancy and it is just a matter of letting sufficient time pass in order have a successful implementation of lean in all areas of healthcare. The second hypothesis states that a major barrier to lean management in healthcare simply is lacking understanding of the lean concepts leading...

  19. Thermal energy management process experiment

    Science.gov (United States)

    Ollendorf, S.

    1984-01-01

    The thermal energy management processes experiment (TEMP) will demonstrate that through the use of two-phase flow technology, thermal systems can be significantly enhanced by increasing heat transport capabilities at reduced power consumption while operating within narrow temperature limits. It has been noted that such phenomena as excess fluid puddling, priming, stratification, and surface tension effects all tend to mask the performance of two-phase flow systems in a 1-g field. The flight experiment approach would be to attack the experiment to an appropriate mounting surface with a 15 to 20 meter effective length and provide a heat input and output station in the form of heaters and a radiator. Using environmental data, the size, location, and orientation of the experiment can be optimized. The approach would be to provide a self-contained panel and mount it to the STEP through a frame. A small electronics package would be developed to interface with the STEP avionics for command and data handling. During the flight, heaters on the evaporator will be exercised to determine performance. Flight data will be evaluated against the ground tests to determine any anomalous behavior.

  20. Professional nurses’ lived experiences regarding the performance management system in the Mopani district

    Directory of Open Access Journals (Sweden)

    Sheillah H. Mboweni

    2017-10-01

    Conclusion: PNs perceived PMS negatively. There is a need to improve leadership and management behaviour by enhancing productivity, job satisfaction and organisational commitment. Constructive feedback, training and capacity development, including standardisation and stabilisation of performance instrument, might improve the process.

  1. Improving Healthcare through Lean Management: Experiences from the Danish healthcare system

    OpenAIRE

    Edwards, Kasper; Nielsen, Anders Paarup

    2011-01-01

    The ideas and principles from lean management are now widely being adopted within the healthcare sector. The analysis in this paper shows that organizations within healthcare most often only implement a limited set of tools and methods from the lean tool-box. Departing from a theoretical analysis of the well-known and universal lean management principles in the context of the healthcare this paper will attempt to formulate and test four hypotheses about possible barriers to the successful imp...

  2. User experience of academic staff in the use of a learning management system tool

    CSIR Research Space (South Africa)

    De Kock, E

    2016-09-01

    Full Text Available comfort level with the use of technology tools. The academic staff are qualified and experienced subject matter experts but this does not translate to having the necessary technical competencies to do online teaching. They consequently could experience...

  3. Quality management system

    International Nuclear Information System (INIS)

    Lee, Mu Sung

    2009-08-01

    This book deals with ISO9001 quality management system which includes summary of this system such as classification of quality, principle of quality management, and definition, requirement and procedure of quality management system, introduction of ISO9001 system like model of ISO9001 quality management system, ISO certificate system, structure of ISO9001 standard, requirement of ISO9001 quality management system, process approach and documentation of system, propel cases of ISO9001 quality management system.

  4. Fostering Undergraduate Research Experiences in Management Information Systems through the "Research Group" Framework

    Science.gov (United States)

    Bartkus, Ken; Mills, Robert; Olsen, David

    2010-01-01

    The purpose of this paper is to propose an innovative approach to engaged learning. Founded on the principles of a scholarly think-tank and administered along the lines of a consulting organization, the proposed "Research Group" framework is designed to facilitate effective and efficient undergraduate research experiences in Management…

  5. Towards a Knowledge (Experience)-Based Recommender System for Crisis Management

    OpenAIRE

    Negre, Elsa

    2013-01-01

    International audience; An early warning system can be defined as a chain of information communication systems comprising sensor, detection, decision, and broker subsystems, in the given order, working in conjunction, forecasting and signaling disturbances adversely affecting the stability of the physical world, and giving sufficient time for the response system to prepare resources and response actions to minimize the impact on the stability of the physical world. In this paper, we present a...

  6. DIRAC Data Management System

    CERN Document Server

    Smith, A C

    2007-01-01

    The LHCb experiment being built to utilize CERN’s flagship Large Hadron Collider will generate data to be analysed by a community of over 600 physicists worldwide. DIRAC, LHCb’s Workload and Data Management System, facilitates the use of underlying EGEE Grid resources to generate, process and analyse this data in the distributed environment. The Data Management System, presented here, provides real-time, data-driven distribution in accordance with LHCb’s Computing Model. The data volumes produced by the LHC experiments are unprecedented, rendering individual institutes and even countries, unable to provide the computing and storage resources required to make full use of the produced data. EGEE Grid resources allow the processing of LHCb data possible in a distributed fashion and LHCb’s Computing Model is based on this approach. Data Management in this environment requires reliable and high-throughput transfer of data, homogeneous access to storage resources and the cataloguing of data replicas, all of...

  7. Empirical guidelines for forest management decision support systems based on the past experiences of the expert's community

    Energy Technology Data Exchange (ETDEWEB)

    Marques, A. F.; Ficko, A.; Kangas, A.; Rosset, C.; Ferreti, F.; Rasinmaki, J.; Packalen, T.; Gordom, S.

    2013-09-01

    Aim of the study: Decision support systems for forest management (FMDSS) have been developed world wide to account for a broad range of forest ecosystems, management goals and organizational frameworks (e.g. the wiki page of the FORSYS project reports 62 existing FMDSSs from 23 countries). The need to enhance the collaboration among this diverse community of developers and users fostered the rise of new group communication processes that could capture useful knowledge from past experiences in order to efficiently provide it to new FMDSS development efforts. Material and methods: This paper presents and tests an exploratory process aiming to identify the empirical guidelines assisting developers and users of FMDSS. This process encompasses a Delphi survey built upon the consolidation of the lessons-learned statements that summarize the past experiences of the experts involved in the FORSYS project. The experts come from 34 countries and have diverse interests, ranging from forest planners, IT developers, social scientists studying participatory planning, and researchers with interests in knowledge management and in quantitative models for forest planning. Main results: The proposed 37 empirical guidelines that group 102 lessons-learned cover a broad range of issues including the DSS development cycle, involvement of the stakeholders, methods, models and knowledge based techniques in use. Research highlights: These results may be used for improving new FMDSS development processes, teaching and training and further suggest new features of FMDSS and future research topics. Furthermore, the guidelines may constitute a knowledge repository that may be continuously improved by a community of practice. (Author)

  8. DIRAC Workload Management System

    CERN Document Server

    Garonne, V; Stokes-Rees, I

    2005-01-01

    The Workload Management System is the core component of the DIRAC distributed MC production and analysis grid environment of the CERN LHCb experiment. This paper discusses the architecture, implementation and performance of this system. The WMS is a community scheduler, realizing a pull paradigm, particulary for the high troughput computing context. It has recently been used for an intensive physics simulation production involving more than 60 sites, 65 TB of data, and over 1000-GHz processor-years.

  9. Test Management Framework for the ATLAS Experiment

    CERN Document Server

    Kazarov, Andrei; The ATLAS collaboration; Avolio, Giuseppe

    2018-01-01

    Test Management Framework for the Data Acquisition of the ATLAS Experiment Data Acquisition (DAQ) of the ATLAS experiment is a large distributed and inhomogeneous system: it consists of thousands of interconnected computers and electronics devices that operate coherently to read out and select relevant physics data. Advanced diagnostics capabilities of the TDAQ control system are a crucial feature which contributes significantly to smooth operation and fast recovery in case of the problems and, finally, to the high efficiency of the whole experiment. The base layer of the verification and diagnostic functionality is a test management framework. We have developed a flexible test management system that allows the experts to define and configure tests for different components, indicate follow-up actions to test failures and describe inter-dependencies between DAQ or detector elements. This development is based on the experience gained with the previous test system that was used during the first three years of th...

  10. Impression Management and Entrepreneurial Experience

    DEFF Research Database (Denmark)

    Halbinger, Maria; Reichstein, Toke

    2016-01-01

    Individuals’ social behavior is of crucial importance to organizational outcomes. We study social behavior patterns by investigating how individuals’ impression management tactics link to entrepreneurial experience as operationalized through the number of times an individual ventures...... into entrepreneurship. Analyzing individual-level data collected through online survey, field studies and experiments in hacker-and makerspaces, we find that impression management behavior that focuses others, i.e. accommodative impression management is positively associated with entrepreneurial experience while self......-focused, i.e. assimilative impression management is negatively associated. Furthermore, our supplementary analyses highlight how high levels of identification with group norms may constrain the extent of entrepreneurial experience. The contributions of the study’s findings are discussed with reference...

  11. The Diatek Arkive "Organizer" patient information management system: experience at a university hospital.

    Science.gov (United States)

    Block, F E; Reynolds, K M; McDonald, J S

    1998-02-01

    To install and successfully use early commercial automatic anesthesia recordkeepers, the Diatek Arkive "Organizer" units, in the operating rooms at a major university medical center. Because of the history of previous academic attempts at automatic anesthesia recordkeeping, the units were installed on a "surprise" basis, with hardly any discussion of the devices beforehand. The devices themselves had a number of minor difficulties at the start, most of which were promptly corrected. Eventually the units were in use in all non-cardiac general operating rooms. At one point, usage reached over 90% of possible cases. Continued opposition to the device on the part of certain individuals, coupled with the obsolescence of the present devices in light of new technology, led to the eventual abandonment of the system and removal of the devices from service. Total resistance to the new devices on the part of a few vocal faculty members was a major factor in the ultimate downfall of the system. The method of introduction, and especially the lack of involvement of faculty, residents, surgeons, operating room personnel, hospital computer personnel, and the hospital administration in the installation also played a role in the failure of the system. Lack of a workable training mechanism for new residents prevented that user group from rapidly gaining comfort with the systems.

  12. Customer Experience Management in Retailing

    OpenAIRE

    Kamaladevi B

    2009-01-01

    Survival of fittest & fastest is the mantra of today’s business game. To compete successfully in this business era, the retailer must focus on the customer’s buying experience. To manage a customer’s experience, retailers should understand what “customer experience” actually means. Customer Experience Management is a strategy that focuses the operations and processes of a business around the needs of the individual customer. It represents a strategy that results in a win–win value exchange be...

  13. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way.......In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  14. Anesthesia information management systems

    Directory of Open Access Journals (Sweden)

    Feri Štivan

    2014-08-01

    Full Text Available Introduction: The use of anesthesia information management systems (AIMS is on the increase. This is particularly true for academic anesthesia departments. The main reasons for slow adoption of these systems in the past are financial barriers associated with implementation of these systems and their not so traditionally obvious potential to improve patient care. In addition, a major obstacle to acceptance of this technology is the concern of users over the impact of the electronic anesthesia record on malpractice exposure.Conclusions: The experience reported by departments using AIMS indicates that these systems are useful for managing malpractice risk. AIMS can enhance the efficiency and effectiveness of preoperative, intraoperative, and post-operative anesthesia care. However, AIMS are able to increase the quality of care and improve operating room efficiency only with careful planning, installation, and customization. Strengths, weaknesses, opportunities and threats (SWOT analysis performed for AIMS could help departments in making better decisions when implementing AIMS.

  15. Strengthening district-based health reporting through the district health management information software system: the Ugandan experience.

    Science.gov (United States)

    Kiberu, Vincent Micheal; Matovu, Joseph K B; Makumbi, Fredrick; Kyozira, Carol; Mukooyo, Eddie; Wanyenze, Rhoda K

    2014-05-13

    Untimely, incomplete and inaccurate data are common challenges in planning, monitoring and evaluation of health sector performance, and health service delivery in many sub-Saharan African settings. We document Uganda's experience in strengthening routine health data reporting through the roll-out of the District Health Management Information Software System version 2 (DHIS2). DHIS2 was adopted at the national level in January 2011. The system was initially piloted in 4 districts, before it was rolled out to all the 112 districts by July 2012. As part of the roll-out process, 35 training workshops targeting 972 users were conducted throughout the country. Those trained included Records Assistants (168, 17.3%), District Health Officers (112, 11.5%), Health Management Information System Focal Persons (HMIS-FPs) (112, 11.5%), District Biostatisticians (107, 11%) and other health workers (473, 48.7%). To assess improvements in health reporting, we compared data on completeness and timeliness of outpatient and inpatient reporting for the period before (2011/12) and after (2012/13) the introduction of DHIS2. We reviewed data on the reporting of selected health service coverage indicators as a proxy for improved health reporting, and documented implementation challenges and lessons learned during the DHIS2 roll-out process. Completeness of outpatient reporting increased from 36.3% in 2011/12 to 85.3% in 2012/13 while timeliness of outpatient reporting increased from 22.4% to 77.6%. Similarly, completeness of inpatient reporting increased from 20.6% to 57.9% while timeliness of inpatient reporting increased from 22.5% to 75.6%. There was increased reporting on selected health coverage indicators (e.g. the reporting of one-year old children who were immunized with three doses of pentavelent vaccine increased from 57% in 2011/12 to 87% in 2012/13). Implementation challenges included limited access to computers and internet (34%), inadequate technical support (23%) and limited

  16. Building a Propulsion Experiment Project Management Environment

    Science.gov (United States)

    Keiser, Ken; Tanner, Steve; Hatcher, Danny; Graves, Sara

    2004-01-01

    What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.

  17. Polysubjective Approach to the Management of the Higher Education System of the State: The Experience of Kazakhstan

    Science.gov (United States)

    Bakhtizin, Ramil; Ignatova, Yelena; Sagitov, Salavat; Ustinova, Oksana; Gaisina, Lyutsiya

    2016-01-01

    The higher education system is the sphere of interaction between the state and the interests of society via their institutions and citizens, which involves the compulsory participation of the subjects of the educational relations in the management and the ability to influence the functioning and development of the higher education system, as well…

  18. Distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Verho, P.; Kaerenlampi, M.; Pitkaenen, M.; Jaerventausta, P.; Partanen, J.

    1997-12-31

    This report comprises a general description of the results obtained in the research projects `Information system applications of a distribution control center`, `Event analysis in primary substation`, and `Distribution management system` of the EDISON research program during the years of 1993 - 1997. The different domains of the project are presented in more detail in other reports. An operational state analysis of a distribution network has been made from the control center point of view and the functions which can not be solved by a conventional SCADA system are determined. The basis for new computer applications is shown to be integration of the computer systems. The main result of the work is a distribution management system (DMS), which is an autonomous system integrated to the existing information systems, SCADA and AM/FM/GIS. The system uses a large number of modelling and computation methods and provides an extensive group of advanced functions to support the distribution network monitoring, fault management, operations planning and optimization. The development platform of the system consists of a Visual C++ programming environment, Windows NT operating system and PC. During the development the DMS has been tested in a pilot utility and it is nowadays in practical use in several Finnish utilities. The use of a DMS improves the quality and economy of power supply in many ways; the outage times can, in particular, be reduced using the system. Based on the achieved experiences some parts of the DMS reached the commercialization phase, too. Initially the commercial products were developed by a software company, Versoft Oy. At present the research results are the basis of a worldwide software product supplied by ABB Transmit Co. (orig.) EDISON Research Programme. 28 refs.

  19. Can experience improve hospital management?

    Directory of Open Access Journals (Sweden)

    Haruhisa Fukuda

    Full Text Available BACKGROUND: Experience curve effects were first observed in the industrial arena as demonstrations of the relationship between experience and efficiency. These relationships were largely determined by improvements in management efficiency and quality of care. In the health care industry, volume-outcome relationships have been established with respect to quality of care improvement, but little is known about the effects of experience on management efficiency. Here, we examine the relationship between experience and hospital management in Japanese hospitals. METHODS: The study sample comprised individuals who had undergone surgery for unruptured abdominal aortic aneurysms and had been discharged from participant hospitals between April 1, 2006 and December 31, 2008. We analyzed the association between case volume (both at the hospital and surgeon level and postoperative complications using multilevel logistic regression analysis. Multilevel log-linear regression analyses were performed to investigate the associations between case volume and length of stay (LOS before and after surgery. RESULTS: We analyzed 909 patients and 849 patients using the hospital-level and surgeon-level analytical models, respectively. The odds ratio of postoperative complication occurrence for an increase of one surgery annually was 0.981 (P < 0.001 at the hospital level and 0.982 (P < 0.001 at the surgeon level. The log-linear regression analyses showed that shorter postoperative LOS was significantly associated with high hospital-level case volume (coefficient for an increase of one surgery: -0.006, P = 0.009 and surgeon-level case volume (coefficient for an increase of one surgery: -0.011, P = 0.022. Although an increase of one surgery annually at the hospital level was statistically associated with a reduction of preoperative LOS by 1.1% (P = 0.006, there was no significant association detected between surgeon-level case volume and preoperative LOS (P = 0

  20. DIRAC Workload Management System

    CERN Document Server

    Paterson, S

    2007-01-01

    DIRAC (Distributed Infrastructure with Remote Agent Control) is the Workload and Data Management system (WMS) for the LHCb experiment. The DIRAC WMS offers a transparent way for LHCb users to submit jobs to the EGEE Grid as well as local clusters and individual PCs. This paper will describe workload management optimizations, which ensure high job efficiency and minimized job start times. The computing requirements of the LHCb experiment can only be fulfilled through the use of many distributed compute resources. DIRAC provides a robust platform to run data productions on all the resources available to LHCb including the EGEE Grid. More recently, user support was added to DIRAC that greatly simplifies the procedure of submitting, monitoring and retrieving output of Grid jobs for the LHCb user community. DIRAC submits Pilot Agents to the EGEE Grid via the gLite WMS as normal jobs. Pilot Agents then request jobs from the DIRAC Workload Management System after the local environment has been checked. Therefore DIR...

  1. Nuclear project management experience in Korea

    International Nuclear Information System (INIS)

    Jae-Pung Jeon

    1987-01-01

    Korea Electric Power Corporation (KEPCO) has been dereloping nuclear power steadily over last 30 years to support effective economic growth of the nation with cheap electric power. In the course of development, KEPCO has experienced various project management patterns diverging from turn-key contracts with foreign vendors to non-turnkey with local affiliates. To culative own project management capabilities, one has to pay continuous efforts for better management systems development and manpower training. KEPCO is ready to share its priceless experiences gained over last three decades of nuclear project operation with any developing nation. (Liu)

  2. Implementation of an Open Source Library Management System: Experiences with Koha 3.0 at the Royal London Homoeopathic Hospital

    Science.gov (United States)

    Bissels, Gerhard

    2008-01-01

    Purpose: The purpose of this paper is to describe the selection process and criteria that led to the implementation of the Koha 3.0 library management system (LMS) at the Complementary and Alternative Medicine Library and Information Service (CAMLIS), Royal London Homoeopathic Hospital. Design/methodology/approach: The paper is a report based on…

  3. The Scenario Approach to the Development of Regional Waste Management Systems (Implementation Experience in the Regions of Russia)

    Science.gov (United States)

    Fomin, Eugene P.; Alekseev, Audrey A.; Fomina, Natalia E.; Dorozhkin, Vladimir E.

    2016-01-01

    The article illustrates a theoretical approach to scenario modeling of economic indicators of regional waste management system. The method includes a three-iterative algorithm that allows the executive authorities and investors to take a decision on logistics, bulk, technological and economic parameters of the formation of the regional long-term…

  4. Human Resource Management System

    OpenAIRE

    Navaz, A. S. Syed; Fiaz, A. S. Syed; Prabhadevi, C.; Sangeetha, V.; Gopalakrishnan, S.

    2013-01-01

    The paper titled HUMAN RESOURCE MANAGEMENT SYSTEM is basically concerned with managing the Administrator of HUMAN RESOURCE Department in a company. A Human Resource Management System, refers to the systems and processes at the intersection between human resource management and information technology. It merges HRM as a discipline and in particular its basic HR activities and processes with the information technology field, whereas the programming of data processing systems evolved into standa...

  5. Avionics System Performance Management

    National Research Council Canada - National Science Library

    Damania, Bhavesh

    1998-01-01

    .... The reasons for improved performance management include advances in processor technology and architectures, increasingly integrated systems, and the requirement of reducing costs in developing and deploying the systems...

  6. Credit Management System

    Data.gov (United States)

    US Agency for International Development — Credit Management System. Outsourced Internet-based application. CMS stores and processes data related to USAID credit programs. The system provides information...

  7. The pharmaceutical management system at Shade Tree Family Clinic: a medical student-run free clinic's experience.

    Science.gov (United States)

    Rosenbaum, Benjamin P; Patel, Sanjay G; Guyer, Dana L; Dunn, Sarah R; Herceg, Megan E; Knox, Caroline K; Miller, Robert F

    2008-09-01

    The Shade Tree Family Clinic (STFC) is a student-run free walk-in health clinic opened by Vanderbilt University medical students in October 2005 to address the acute and chronic health needs of the underinsured community in East Nashville. STFC founders decided that the clinic would provide complete medical care, including dispensing commonly prescribed medications at no charge to patients. After several months of managing the inventory in a log book, a medical student author created a Web-based pharmaceutical tracking system to manage the medication formulary. In the process, the authors found little literature available addressing the logistics of setting up an electronic pharmacy system. The system created uses the freely available RxNorm and US Department of Veterans Affairs National Drug File Reference Terminology databases for medication and classification data. Incorporation of these databases allows medical students to dispense and restock medications with ease. The system ensures accurate data entry, improves efficiency, and facilitates continuity of care at a clinic staffed by hundreds of different students and physicians. The STFC pharmaceutical tracking system has facilitated the acquisition and efficient management of medications and consequently has had a great impact on the success of STFC.

  8. Pain Experience and Behavior Management in Pediatric Dentistry: A Comparison between Traditional Local Anesthesia and the Wand Computerized Delivery System

    OpenAIRE

    Garret-Bernardin, Annelyse; Cantile, Tiziana; D'Ant?, Vincenzo; Galanakis, Alexandros; Fauxpoint, Gabriel; Ferrazzano, Gianmaria Fabrizio; De Rosa, Sara; Vallogini, Giulia; Romeo, Umberto; Galeotti, Angela

    2017-01-01

    Aim. To evaluate the pain experience and behavior during dental injection, using the Wand computerized delivery system versus conventional local anesthesia in children and adolescents. Methods. An observational crossover split mouth study was performed on 67 patients (aged 7 to 15 years), requiring local anesthesia for dental treatments in both sides of the dental arch. Patients received both types of injections in two separate appointments, one with the use of a Computer Delivery System (the...

  9. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  10. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  11. Web technology to support LHD experiment management

    Energy Technology Data Exchange (ETDEWEB)

    Nagayama, Yoshio, E-mail: nagayama.yoshio@nifs.ac.jp [National Institute for Fusion Science, 322-6 Oroshi, Toki 509-5292 (Japan); Emoto, Masahiko; Yoshida, Masanobu; Iwata, Chie [National Institute for Fusion Science, 322-6 Oroshi, Toki 509-5292 (Japan)

    2012-12-15

    The large helical device (LHD), which is the world largest helical confinement system, is a national project serving Japanese fusion community. In LHD, experiments of 7000 shots are carried out for 250 proposals every year. Efficient experiment arrangement is required in order to carry out many collaborators' proposal. Sometimes collaborators who are not familiar to LHD stay at NIFS only a few day to join the experiment. Issues are as follows: how to reduce collaborator's effort, how to reduce manager's effort to optimize the schedule; how to publicize plan and results of the experiment. We have developed web systems of virtual printer, experimental proposal and scheduling by using Ruby on Rails (RoR), which encapsulates relational data base (RDB) and AJAX. RDB enables to make tables by searching and sorting data with key words. Web servers are equipped in the virtual computer system in order to minimize efforts and cost of maintenance. The LHD web portal has been also developed in order to provide collaborators an efficient and intuitive interface to access the above systems, to take LHD information, and to use tools for LHD data analysis. The web systems have reduced collaborators' and managers' efforts significantly.

  12. Integrated management systems

    CERN Document Server

    Bugdol, Marek

    2015-01-01

    Examining the challenges of integrated management, this book explores the importance and potential benefits of using an integrated approach as a cross-functional concept of management. It covers not only standardized management systems (e.g. International Organization for Standardization), but also models of self-assessment, as well as different types of integration. Furthermore, it demonstrates how processes and systems can be integrated, and how management efficiency can be increased. The major part of this book focuses on management concepts which use integration as a key tool of management processes (e.g. the systematic approach, supply chain management, virtual and network organizations, processes management and total quality management). Case studies, illustrations, and tables are also provided to exemplify and illuminate the content, as well as examples of successful and failed integrations. Providing a particularly useful resource to managers and specialists involved in the improvement of organization...

  13. Audit Information Management System

    Data.gov (United States)

    US Agency for International Development — USAID/OIG has initiated its new Audit Information Management System (AIMS) to track OIG's audit recommendations and USAID's management decisions. OIG's in-house...

  14. Information systems project management

    CERN Document Server

    Olson, David

    2014-01-01

    Information Systems Project Management addresses project management in the context of information systems. It deals with general project management principles, with focus on the special characteristics of information systems. It is based on an earlier text, but shortened to focus on essential project management elements.This updated version presents various statistics indicating endemic problems in completing information system projects on time, within budget, at designed functionality. While successful completion of an information systems project is a challenge, there are some things that ca

  15. User experience analysis of e-TB Manager, a nationwide electronic tuberculosis recording and reporting system in Ukraine

    Directory of Open Access Journals (Sweden)

    Niranjan Konduri

    2017-05-01

    Full Text Available Ukraine has successfully implemented e-TB Manager nationwide as its mandatory national tuberculosis registry after first introducing it in 2009. Our objective was to perform an end-of-programme evaluation after formal handover of the registry administration to Ukraine's Centre for Disease Control in 2015. We conducted a nationwide, cross-sectional, anonymous, 18-point user experience survey, and stratified the registry's transaction statistics to demonstrate usability. Contrary to initial implementation experience, older users (aged >50 years, often with limited or no computer proficiency prior to using the registry, had significantly better user experience scores for at least six of the 12 measures compared to younger users (aged 18–29 years. Using the registry for >3 years was associated with significantly higher scores for having capacity, adequacy of training received and satisfaction with the registry. Of the 5.9 million transactions over a 4-year period, nine out of 24 oblasts (regions and Kiev city accounted for 62.5% of all transactions, and corresponded to 59% of Ukraine's tuberculosis burden. There were 437 unique active users in 486 rayons (districts of Ukraine, demonstrating extensive reach. Our key findings complement the World Health Organization and European Respiratory Society's agenda for action on digital health to help implement the End TB Strategy.

  16. User experience analysis of e-TB Manager, a nationwide electronic tuberculosis recording and reporting system in Ukraine.

    Science.gov (United States)

    Konduri, Niranjan; Sawyer, Kelly; Nizova, Nataliya

    2017-04-01

    Ukraine has successfully implemented e-TB Manager nationwide as its mandatory national tuberculosis registry after first introducing it in 2009. Our objective was to perform an end-of-programme evaluation after formal handover of the registry administration to Ukraine's Centre for Disease Control in 2015. We conducted a nationwide, cross-sectional, anonymous, 18-point user experience survey, and stratified the registry's transaction statistics to demonstrate usability. Contrary to initial implementation experience, older users (aged >50 years), often with limited or no computer proficiency prior to using the registry, had significantly better user experience scores for at least six of the 12 measures compared to younger users (aged 18-29 years). Using the registry for >3 years was associated with significantly higher scores for having capacity, adequacy of training received and satisfaction with the registry. Of the 5.9 million transactions over a 4-year period, nine out of 24 oblasts (regions) and Kiev city accounted for 62.5% of all transactions, and corresponded to 59% of Ukraine's tuberculosis burden. There were 437 unique active users in 486 rayons (districts) of Ukraine, demonstrating extensive reach. Our key findings complement the World Health Organization and European Respiratory Society's agenda for action on digital health to help implement the End TB Strategy.

  17. Selecting a Laboratory Information Management System for Biorepositories in Low- and Middle-Income Countries: The H3Africa Experience and Lessons Learned

    Science.gov (United States)

    Musinguzi, Henry; Lwanga, Newton; Kezimbira, Dafala; Kigozi, Edgar; Katabazi, Fred Ashaba; Wayengera, Misaki; Joloba, Moses Lutaakome; Abayomi, Emmanuel Akin; Swanepoel, Carmen; Croxton, Talishiea; Ozumba, Petronilla; Thankgod, Anazodo; van Zyl, Lizelle; Mayne, Elizabeth Sarah; Kader, Mukthar; Swartz, Garth

    2017-01-01

    Biorepositories in Africa need significant infrastructural support to meet International Society for Biological and Environmental Repositories (ISBER) Best Practices to support population-based genomics research. ISBER recommends a biorepository information management system which can manage workflows from biospecimen receipt to distribution. The H3Africa Initiative set out to develop regional African biorepositories where Uganda, Nigeria, and South Africa were successfully awarded grants to develop the state-of-the-art biorepositories. The biorepositories carried out an elaborate process to evaluate and choose a laboratory information management system (LIMS) with the aim of integrating the three geographically distinct sites. In this article, we review the processes, African experience, lessons learned, and make recommendations for choosing a biorepository LIMS in the African context.

  18. Managing hybrid marketing systems.

    Science.gov (United States)

    Moriarty, R T; Moran, U

    1990-01-01

    As competition increases and costs become critical, companies that once went to market only one way are adding new channels and using new methods - creating hybrid marketing systems. These hybrid marketing systems hold the promise of greater coverage and reduced costs. But they are also hard to manage; they inevitably raise questions of conflict and control: conflict because marketing units compete for customers; control because new indirect channels are less subject to management authority. Hard as they are to manage, however, hybrid marketing systems promise to become the dominant design, replacing the "purebred" channel strategy in all kinds of businesses. The trick to managing the hybrid is to analyze tasks and channels within and across a marketing system. A map - the hybrid grid - can help managers make sense of their hybrid system. What the chart reveals is that channels are not the basic building blocks of a marketing system; marketing tasks are. The hybrid grid forces managers to consider various combinations of channels and tasks that will optimize both cost and coverage. Managing conflict is also an important element of a successful hybrid system. Managers should first acknowledge the inevitability of conflict. Then they should move to bound it by creating guidelines that spell out which customers to serve through which methods. Finally, a marketing and sales productivity (MSP) system, consisting of a central marketing database, can act as the central nervous system of a hybrid marketing system, helping managers create customized channels and service for specific customer segments.

  19. Big data managing in a landslide early warning system: experience from a ground-based interferometric radar application

    Science.gov (United States)

    Intrieri, Emanuele; Bardi, Federica; Fanti, Riccardo; Gigli, Giovanni; Fidolini, Francesco; Casagli, Nicola; Costanzo, Sandra; Raffo, Antonio; Di Massa, Giuseppe; Capparelli, Giovanna; Versace, Pasquale

    2017-10-01

    A big challenge in terms or landslide risk mitigation is represented by increasing the resiliency of society exposed to the risk. Among the possible strategies with which to reach this goal, there is the implementation of early warning systems. This paper describes a procedure to improve early warning activities in areas affected by high landslide risk, such as those classified as critical infrastructures for their central role in society. This research is part of the project LEWIS (Landslides Early Warning Integrated System): An Integrated System for Landslide Monitoring, Early Warning and Risk Mitigation along Lifelines. LEWIS is composed of a susceptibility assessment methodology providing information for single points and areal monitoring systems, a data transmission network and a data collecting and processing center (DCPC), where readings from all monitoring systems and mathematical models converge and which sets the basis for warning and intervention activities. The aim of this paper is to show how logistic issues linked to advanced monitoring techniques, such as big data transfer and storing, can be dealt with compatibly with an early warning system. Therefore, we focus on the interaction between an areal monitoring tool (a ground-based interferometric radar) and the DCPC. By converting complex data into ASCII strings and through appropriate data cropping and average, and by implementing an algorithm for line-of-sight correction, we managed to reduce the data daily output without compromising the capability for performing.

  20. Facility Environmental Management System

    Data.gov (United States)

    Federal Laboratory Consortium — This is the Web site of the Federal Highway Administration's (FHWA's) Turner-Fairbank Highway Research Center (TFHRC) facility Environmental Management System (EMS)....

  1. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  2. Onco-STS: a web-based laboratory information management system for sample and analysis tracking in oncogenomic experiments.

    Science.gov (United States)

    Gavrielides, Mike; Furney, Simon J; Yates, Tim; Miller, Crispin J; Marais, Richard

    2014-01-01

    Whole genomes, whole exomes and transcriptomes of tumour samples are sequenced routinely to identify the drivers of cancer. The systematic sequencing and analysis of tumour samples, as well other oncogenomic experiments, necessitates the tracking of relevant sample information throughout the investigative process. These meta-data of the sequencing and analysis procedures include information about the samples and projects as well as the sequencing centres, platforms, data locations, results locations, alignments, analysis specifications and further information relevant to the experiments. The current work presents a sample tracking system for oncogenomic studies (Onco-STS) to store these data and make them easily accessible to the researchers who work with the samples. The system is a web application, which includes a database and a front-end web page that allows the remote access, submission and updating of the sample data in the database. The web application development programming framework Grails was used for the development and implementation of the system. The resulting Onco-STS solution is efficient, secure and easy to use and is intended to replace the manual data handling of text records. Onco-STS allows simultaneous remote access to the system making collaboration among researchers more effective. The system stores both information on the samples in oncogenomic studies and details of the analyses conducted on the resulting data. Onco-STS is based on open-source software, is easy to develop and can be modified according to a research group's needs. Hence it is suitable for laboratories that do not require a commercial system.

  3. Learning Content Management Systems

    Directory of Open Access Journals (Sweden)

    Tache JURUBESCU

    2008-01-01

    Full Text Available The paper explains the evolution of e-Learning and related concepts and tools and its connection with other concepts such as Knowledge Management, Human Resources Management, Enterprise Resource Planning, and Information Technology. The paper also distinguished Learning Content Management Systems from Learning Management Systems and Content Management Systems used for general web-based content. The newest Learning Content Management System, very expensive and yet very little implemented is one of the best tools that helps us to cope with the realities of the 21st Century in what learning concerns. The debates over how beneficial one or another system is for an organization, can be driven by costs involved, efficiency envisaged, and availability of the product on the market.

  4. Cryogenic fluid management (base R/T): Cryogenic fluid systems, Cryogenic Orbital Nitrogen Experiment (CONE), Cryogenic Orbital Hydrogen Experiment (COHE). (Transportation focused technology)

    Science.gov (United States)

    Symons, Pat

    1991-01-01

    The topics presented are covered in viewgraph form. The concluded remarks are: (1) advanced cryogenic fluid systems technology is enhancing or enabling to all known transportation scenarios for space exploration; (2) an integrated/coordinated program involving LeRC/MSFC has been formulated to address all known CFM needs - new needs should they develop, can be accommodated within available skills/facilities; (3) all required/experienced personnel and facilities are finally in place - data from initial ground-based experiments is being collected and analyzed - small scale STS experiments are nearing flight - program is beginning to yield significant results; (4) future proposed funding to primarily come from two sources; and (5) cryogenic fluid experimentation is essential to provide required technology and assure implementation in future NASA missions.

  5. Environmental asset management: Risk management systems

    CSIR Research Space (South Africa)

    Naudé, Brian

    2017-07-01

    Full Text Available purposes until the assets are exhausted. This paper addresses elements of environmental crime and the risk management strategies as part of EAP, including risk management system functions. A unique implemented risk management system in the Kruger National...

  6. Recycling management including transportation experience

    International Nuclear Information System (INIS)

    Ricaud, J.L.

    1994-01-01

    The nuclear industry, at least in advanced countries such as Japan, France and other European countries, has developed for years a global strategy of fuel utilization which implies an extensive recycling and reuse of spent fuel. Such recycling strategies are now increasingly required from the industry in general by the various Governments and international organizations. Nuclear fuel recycling and waste management are the two faces of the same policy: the closed fuel cycle, whereby reprocessing of spent fuel makes available for recycling the energetic contents : uranium and plutonium, while segregating the real waste in categories for their specific treatment, conditioning, storage, transportation and final disposal. Plutonium recycling is performed through the fabrication of the so-called mixed oxide fuel (MOX), where fissile plutonium replaces the U 235 isotope used in UO 2 fuel. The international trade of nuclear materials and services, under close control of IAEA and other national and international organization, has let to the circulation of materials between the producers of uranium and enrichment fuel, fabrication, reprocessing and recycling services, and the customers worldwide. The industrial transport experience now accumulated shows an excellent record in terms of safety and quality. This communication will describe the current situation and future trends of the recycling route mainly through COGEMA industrial experience. 1 fig

  7. Pain Experience and Behavior Management in Pediatric Dentistry: A Comparison between Traditional Local Anesthesia and the Wand Computerized Delivery System.

    Science.gov (United States)

    Garret-Bernardin, Annelyse; Cantile, Tiziana; D'Antò, Vincenzo; Galanakis, Alexandros; Fauxpoint, Gabriel; Ferrazzano, Gianmaria Fabrizio; De Rosa, Sara; Vallogini, Giulia; Romeo, Umberto; Galeotti, Angela

    2017-01-01

    Aim. To evaluate the pain experience and behavior during dental injection, using the Wand computerized delivery system versus conventional local anesthesia in children and adolescents. Methods. An observational crossover split mouth study was performed on 67 patients (aged 7 to 15 years), requiring local anesthesia for dental treatments in both sides of the dental arch. Patients received both types of injections in two separate appointments, one with the use of a Computer Delivery System (the Wand STA system) and one with the traditional syringe. The following data were recorded: pain rating; changes in heart rate; level of collaboration; patient satisfaction. The data were analyzed using ANOVA for quantitative outcomes and nonparametric analysis (Kruskal-Wallis) for qualitative parameters. Results. The use of the Wand system determined significantly lower pain ratings and lower increase of heart rate than the traditional syringe. During injection, the number of patients showing a relaxed behavior was higher with the Wand than with the traditional local anesthesia. The patient level of satisfaction was higher with the Wand compared to the conventional local anesthesia. Conclusions. The Wand system may provide a less painful injection when compared to the conventional local anesthesia and it seemed to be better tolerated with respect to a traditional syringe.

  8. Pain Experience and Behavior Management in Pediatric Dentistry: A Comparison between Traditional Local Anesthesia and the Wand Computerized Delivery System

    Directory of Open Access Journals (Sweden)

    Annelyse Garret-Bernardin

    2017-01-01

    Full Text Available Aim. To evaluate the pain experience and behavior during dental injection, using the Wand computerized delivery system versus conventional local anesthesia in children and adolescents. Methods. An observational crossover split mouth study was performed on 67 patients (aged 7 to 15 years, requiring local anesthesia for dental treatments in both sides of the dental arch. Patients received both types of injections in two separate appointments, one with the use of a Computer Delivery System (the Wand STA system and one with the traditional syringe. The following data were recorded: pain rating; changes in heart rate; level of collaboration; patient satisfaction. The data were analyzed using ANOVA for quantitative outcomes and nonparametric analysis (Kruskal–Wallis for qualitative parameters. Results. The use of the Wand system determined significantly lower pain ratings and lower increase of heart rate than the traditional syringe. During injection, the number of patients showing a relaxed behavior was higher with the Wand than with the traditional local anesthesia. The patient level of satisfaction was higher with the Wand compared to the conventional local anesthesia. Conclusions. The Wand system may provide a less painful injection when compared to the conventional local anesthesia and it seemed to be better tolerated with respect to a traditional syringe.

  9. Environmental compliance management system

    Energy Technology Data Exchange (ETDEWEB)

    Cason, A. [Dow Chemical Co., Midland, MI (United States); Larrinaga, L.

    1995-12-01

    A cross-functional team of environmental regulatory experts, plant managers, and plant engineers have been working since 1991 on the development, implementation and maintenance of the Environmental Compliance Management System. The Environmental Compliance Management System is a practical and accurate method of determining the applicability of the state and federal environmental regulations and of establishing standard and straightforward procedures to meet these requirements. The Environmental Compliance Management System allows individual manufacturing facilities to avoid the additional manpower that would be required to read, digest and decide on the applicability and plan of action to meet the requirements of all the environmental regulations.

  10. NASA's Risk Management System

    Science.gov (United States)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  11. Lithium battery management system

    Science.gov (United States)

    Dougherty, Thomas J [Waukesha, WI

    2012-05-08

    Provided is a system for managing a lithium battery system having a plurality of cells. The battery system comprises a variable-resistance element electrically connected to a cell and located proximate a portion of the cell; and a device for determining, utilizing the variable-resistance element, whether the temperature of the cell has exceeded a predetermined threshold. A method of managing the temperature of a lithium battery system is also included.

  12. Medical Information Management System

    Science.gov (United States)

    Alterescu, S.; Hipkins, K. R.; Friedman, C. A.

    1979-01-01

    On-line interactive information processing system easily and rapidly handles all aspects of data management related to patient care. General purpose system is flexible enough to be applied to other data management situations found in areas such as occupational safety data, judicial information, or personnel records.

  13. Metadata management staging system

    Energy Technology Data Exchange (ETDEWEB)

    2013-08-01

    Django application providing a user-interface for building a file and metadata management system. An evolution of our Node.js and CouchDb metadata management system. This one focuses on server functionality and uses a well-documented, rational and REST-ful API for data access.

  14. Archival Information Management System.

    Science.gov (United States)

    1995-02-01

    management system named Archival Information Management System (AIMS), designed to meet the audit trail requirement for studies completed under the...are to be archived to the extent that future reproducibility and interrogation of results will exist. This report presents a prototype information

  15. Managing Temporal Knowledge in Port Management Systems

    Directory of Open Access Journals (Sweden)

    Anita Gudelj

    2006-05-01

    Full Text Available Large ports need to deal with a number of disparate activities:the movement of ships, containers and other cargo, theloading and unloading of ships and containers, customs activities.As well as human resources, anchorages, channels, lighters,tugs, berths, warehouse and other storage spaces have to beallocated and released. The efficient management of a port involvesmanaging these activities and resources, managing theflows of money involved between the agents providing and usingthese resources, and providing management information.Many information systems will be involved.Many applications have to deal with a large amount of datawhich not only represent the perceived state of the real world atpresent, but also past and/or future states. These applicationsare not served adequately by today's computer managementand database systems. In particular, deletions and updates insuch systems have destructive semantics. This means that previousdatabase contents (representing previous perceived statesof the real world cannot be accessed anymore.A review of how define temporal data models, based ongeneralizing a non-temporal data model in to a temporal one toimprove port management is presented. This paper describes apractical experiment which supports managing temporal dataalong with the corresponding prototype implementations.

  16. Quality Management and Integrated Management System

    OpenAIRE

    BŘICHÁČKOVÁ, Lenka

    2011-01-01

    Graduation theses is directed on the Management System and the characteristics of the company and its development since 2003. Theses is introduced on the Integrated Management System, which consists of the Quality Management System, the Environmental Management System and the Occupational Health and Safety Assessment Series. The theses is especially directed on the Occupational Health and Safety Assessment Series. Management System is analyzed and steps are recommended to improve these proces...

  17. Health system factors influencing management of multidrug-resistant tuberculosis in four European Union countries - learning from country experiences.

    Science.gov (United States)

    de Vries, Gerard; Tsolova, Svetla; Anderson, Laura F; Gebhard, Agnes C; Heldal, Einar; Hollo, Vahur; Cejudo, Laura Sánchez-Cambronero; Schmid, Daniela; Schreuder, Bert; Varleva, Tonka; van der Werf, Marieke J

    2017-04-19

    In the European Union and European Economic Area only 38% of multidrug-resistant tuberculosis patients notified in 2011 completed treatment successfully at 24 months' evaluation. Socio-economic factors and patient factors such as demographic characteristics, behaviour and attitudes are associated with treatment outcomes. Characteristics of healthcare systems also affect health outcomes. This study was conducted to identify and better understand the contribution of health system components to successful treatment of multidrug-resistant tuberculosis. We selected four European Union countries to provide for a broad range of geographical locations and levels of treatment success rates of the multidrug-resistant tuberculosis cohort in 2009. We conducted semi-structured interviews following a conceptual framework with representatives from policy and planning authorities, healthcare providers and civil society organisations. Responses were organised according to the six building blocks of the World Health Organization health systems framework. In the four included countries, Austria, Bulgaria, Spain, and the United Kingdom, the following healthcare system factors were perceived as key to achieving good treatment results for patients with multidrug-resistant tuberculosis: timely diagnosis of drug-resistant tuberculosis; financial systems that ensure access to a full course of treatment and support for multidrug-resistant tuberculosis patients; patient-centred approaches with strong intersectoral collaboration that address patients' emotional and social needs; motivated and dedicated healthcare workers with sufficient mandate and means to support patients; and cross-border management of multidrug-resistant tuberculosis to secure continuum of care between countries. We suggest that the following actions may improve the success of treatment for multidrug-resistant tuberculosis patients: deployment of rapid molecular diagnostic tests; development of context-specific treatment

  18. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  19. An experience with the Advanced Breast Biopsy Instrumentation (ABBI) system in the management of non-palpable breast lesions

    Energy Technology Data Exchange (ETDEWEB)

    Insausti, Pina L.; Vivas, I.; Martinez-Cuesta, A.; Bergaz, F. [Department of Radiology, Clinica Universitaria de Navarra, Pamplona (Spain); Alberro, J.A. [Department of General Surgery, Instituto Oncologico, San Sebastian (Spain); Regueira, F.M.; Zornoza, G. [Department of General Surgery, Clinica Universitaria de Navarra, C/Pio XII, 36, 31008 Pamplona (Spain); Imana, J. [Department of Radiology, Instituto Oncologico, San Sebastian (Spain); Errasti, T. [Department of Gynaecology, Clinica Universitaria de Navarra, C/Pio XII, 36, 31008 Pamplona (Spain); Rezola, R. [Department of Pathology, Instituto Oncologico, 20012 San Sebastian (Spain)

    2002-07-01

    Our objective was to evaluate our experience with the Advanced Breast Biopsy Instrumentation system (ABBI) in non-palpable breast lesions in a prospective study from July 1998 to November 2000. The ABBI system was included in a protocol for BIRADS 4 non-palpable, small (<15 mm) breast lesions. Digital radiographs of both specimen and biopsy cavity were obtained to validate the procedure. A total of 255 ABBI biopsies were performed in 254 patients. In 251 cases the lesions were successfully removed (98.4%). Mammographic lesions consisted of 176 cases of microcalcifications (69%), 51 cases of architectural distortions (20%) and 28 cases of nodules (11%). Seventy-two carcinomas were diagnosed (28.2%). Affected margins were found in 41 cases (56.9%). Residual tumour was seen in 31 patients (43%). Seventeen borderline results and 33 benign architectural distortions obviated further procedures. The complication rate in 10 cases was as follows: 3 wound infections; 4 haematomas; and 3 vasovagal reactions. The main utility of the ABBI system is to allow a reliable diagnosis in complex lesions, such as small clusters of microcalcifications and especially architectural distortions. Surgery can be avoided for borderline cases if the lesion is completely removed and free margins are obtained in the pathology study. Therapeutic use is controversial and can be applied only in selected cases. (orig.)

  20. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  1. Chernobyl experience of emergency data management

    International Nuclear Information System (INIS)

    Bolshov, L.; Linge, I.; Arutyunyan, R.; Ilushkin, A.; Kanevsky, M.; Kiselev, V.; Melikhova, E.; Ossipiants, I.; Pavlovsky, O.

    1997-01-01

    The use of the Chernobyl experience in emergency data management is presented. Information technologies for the generalization of practical experience in the protection of the population after the Chernobyl accident are described. The two main components of this work are the development of the administrative information system (AIS) and the creation of the central data bank. The current state of the AIS, the data bank and the bank of models is described. Data accumulated and models are used to estimate the consequences of radiation accidents and to provide different types of prognosis. Experience of accumulated analysis data allows special software to be developed for large-scale simulation of radiation consequences of major radiation accidents and to organize practical exercises. Some examples of such activity are presented. (orig.)

  2. An anaesthesia information management system as a tool for a quality assurance program: 10years of experience.

    Science.gov (United States)

    Motamed, Cyrus; Bourgain, Jean Louis

    2016-06-01

    Anaesthesia Information Management Systems (AIMS) generate large amounts of data, which might be useful for quality assurance programs. This study was designed to highlight the multiple contributions of our AIMS system in extracting quality indicators over a period of 10years. The study was conducted from 2002 to 2011. Two methods were used to extract anaesthesia indicators: the manual extraction of individual files for monitoring neuromuscular relaxation and structured query language (SQL) extraction for other indicators which were postoperative nausea and vomiting (PONV), pain, sedation scores, pain-related medications, scores and postoperative hypothermia. For each indicator, a program of information/meetings and adaptation/suggestions for operating room and PACU personnel was initiated to improve quality assurance, while data were extracted each year. The study included 77,573 patients. The mean overall completeness of data for the initial years ranged from 55 to 85% and was indicator-dependent, which then improved to 95% completeness for the last 5years. The incidence of neuromuscular monitoring was initially 67% and then increased to 95% (P<0.05). The rate of pharmacological reversal remained around 53% throughout the study. Regarding SQL data, an improvement of severe postoperative pain and PONV scores was observed throughout the study, while mild postoperative hypothermia remained a challenge, despite efforts for improvement. The AIMS system permitted the follow-up of certain indicators through manual sampling and many more via SQL extraction in a sustained and non-time-consuming way across years. However, it requires competent and especially dedicated resources to handle the database. Copyright © 2016 Société française d'anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.

  3. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  4. Information sciences experiment system

    Science.gov (United States)

    Katzberg, Stephen J.; Murray, Nicholas D.; Benz, Harry F.; Bowker, David E.; Hendricks, Herbert D.

    1990-01-01

    The rapid expansion of remote sensing capability over the last two decades will take another major leap forward with the advent of the Earth Observing System (Eos). An approach is presented that will permit experiments and demonstrations in onboard information extraction. The approach is a non-intrusive, eavesdropping mode in which a small amount of spacecraft real estate is allocated to an onboard computation resource. How such an approach allows the evaluation of advanced technology in the space environment, advanced techniques in information extraction for both Earth science and information science studies, direct to user data products, and real-time response to events, all without affecting other on-board instrumentation is discussed.

  5. E-health systems for management of MDR-TB in resource-poor environments: a decade of experience and recommendations for future work.

    Science.gov (United States)

    Fraser, Hamish S F; Habib, Ali; Goodrich, Mark; Thomas, David; Blaya, Joaquin A; Fils-Aime, Joseph Reginald; Jazayeri, Darius; Seaton, Michael; Khan, Aamir J; Choi, Sharon S; Kerrison, Foster; Falzon, Dennis; Becerra, Mercedes C

    2013-01-01

    Multi-drug resistant TB (MDR-TB) is a complex infectious disease that is a growing threat to global health. It requires lengthy treatment with multiple drugs and specialized laboratory testing. To effectively scale up treatment to thousands of patients requires good information systems to support clinical care, reporting, drug forecasting, supply chain management and monitoring. Over the last decade we have developed the PIH-EMR electronic medical record system, and subsequently OpenMRS-TB, to support the treatment of MDR-TB in Peru, Haiti, Pakistan, and other resource-poor environments. We describe here the experience with implementing these systems and evaluating many aspects of their performance, and review other systems for MDR-TB management. We recommend a new approach to information systems to address the barriers to scale up MDR-TB treatment, particularly access to the appropriate drugs and lab data. We propose moving away from fragmented, vertical systems to focus on common platforms, addressing all stages of TB care, support for open data standards and interoperability, care for a wide range of diseases including HIV, integration with mHealth applications, and ability to function in resource-poor environments.

  6. Intranet Document Management Systems.

    Science.gov (United States)

    Wen, H. Joseph; Yen, David C.; Lin, Binshan

    1998-01-01

    Explains how intranets facilitate documentation availability within a company at substantial cost savings. Topics include intranet document management systems (IDMS); publication costs for printed materials; hardware and software specifications; performance; and security. (Author/LRW)

  7. Correspondence Management System

    Data.gov (United States)

    U.S. Environmental Protection Agency — CMS is EPA's correspondence tracking and workflow management system. It scans, logs, routes, tracks, and stores incoming and outgoing correspondence in all Program...

  8. Holdings Management System

    Data.gov (United States)

    National Archives and Records Administration — This system supports the physical management of permanent, hard-copy archival Records in the custody of National Archives and Records Administration program offices.

  9. Earned Value Management System

    Data.gov (United States)

    US Agency for International Development — EVMS is a system for measuring project performance and progress in an objective manner by supporting earned value management. EVMS has the ability to combine...

  10. Environmental Management Systems

    Science.gov (United States)

    This site on Environmental Management Systems (EMS) provides information and resources related to EMS for small businesses and private industry, as well as local, state and federal agencies, including all the EPA offices and laboratories.

  11. Portfolio Management System

    Data.gov (United States)

    US Agency for International Development — PfMS is an implementation of WorkLenz. WorkLenz is USAID's portfolio management system tool. It is a commercially available, off-the-shelf (COTS) package that...

  12. Database Management System

    Science.gov (United States)

    1990-01-01

    In 1981 Wayne Erickson founded Microrim, Inc, a company originally focused on marketing a microcomputer version of RIM (Relational Information Manager). Dennis Comfort joined the firm and is now vice president, development. The team developed an advanced spinoff from the NASA system they had originally created, a microcomputer database management system known as R:BASE 4000. Microrim added many enhancements and developed a series of R:BASE products for various environments. R:BASE is now the second largest selling line of microcomputer database management software in the world.

  13. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  14. Audit Management System

    CERN Document Server

    Alconada, Federico

    2015-01-01

    In the need of renewing their system, the Internal Audit department has given a proposal for building a new one. Taking into consideration the problems of their system they elaborated a requirement's list with the functionalities and features they were expecting from the new management system. This new system would be primarily for the use of the Internal Audit staff but it would also support the follow-up of internal audit recommendations by potentially all CERN staff members.

  15. Radioactive waste management: Spanish experiences

    International Nuclear Information System (INIS)

    Beceiro, A. R.

    1996-01-01

    Radioactive waste generation began in Spain during the 1950's, in association with the first applications of radioactive isotopes in industry, medicine and research. Spain's first nuclear power plant began its operations in 1968. At present, there are in operation some one thousand installations possessing the administrative authorization required to use radioactive isotopes (small producers), nine nuclear groups and a tenth is now entering the dismantling phase. There are also activities and installations pertaining to the front end of the nuclear fuel cycle (mining, milling and the manufacturing of fuel elements). Until 1985, the research center Junta de Energia Nuclear (now CIEMAT) rendered radioactive waste removal, and subsequent conditioning and temporary storage services to the small producers. Since the beginning of their operations the nuclear power plants and fuel cycle facilities have had the capacity to condition and temporarily store their own radioactive wastes. ENRESA (Empresa Nacional de Residuos Radiactivos, S. A.) began its operations in the second half of 1985. It is a state-owned company created by the Government in accordance with a previous parliamentary resolution and commissioned to establish a system for management of such wastes throughout Spain, being in charge also of the dismantling of nuclear power plants and other major installations at the end of their operating lifetimes. Possibly the most outstanding characteristic of ENRESA's evolution over these last seven years has been the need to bring about a compromise between solving the most immediate and pressing day-to-day problems of operation (the first wastes were removed at the beginning of 1986) and establishing the basic organization, resources, technology and installations required for ENRESA to operate efficiently in the long term. (author)

  16. Wilderness visitors, experiences, and visitor management

    Science.gov (United States)

    David N. Cole; Stephen F. McCool

    2000-01-01

    This paper provides an overview of the Wilderness science in a time of change conference-Volume 4: Wilderness visitors, experiences, and visitor management. Wilderness areas are managed to protect their wilderness character, but they also provide opportunities for recreation use. Decades ago, relatively few people sought wilderness experiences, and...

  17. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  18. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  19. Model and Computing Experiment for Research and Aerosols Usage Management

    Directory of Open Access Journals (Sweden)

    Daler K. Sharipov

    2012-09-01

    Full Text Available The article deals with a math model for research and management of aerosols released into the atmosphere as well as numerical algorithm used as hardware and software systems for conducting computing experiment.

  20. A distribution management system

    Energy Technology Data Exchange (ETDEWEB)

    Jaerventausta, P.; Verho, P.; Kaerenlampi, M.; Pitkaenen, M. [Tampere Univ. of Technology (Finland); Partanen, J. [Lappeenranta Univ. of Technology (Finland)

    1998-08-01

    The development of new distribution automation applications is considerably wide nowadays. One of the most interesting areas is the development of a distribution management system (DMS) as an expansion to the traditional SCADA system. At the power transmission level such a system is called an energy management system (EMS). The idea of these expansions is to provide supporting tools for control center operators in system analysis and operation planning. Nowadays the SCADA is the main computer system (and often the only) in the control center. However, the information displayed by the SCADA is often inadequate, and several tasks cannot be solved by a conventional SCADA system. A need for new computer applications in control center arises from the insufficiency of the SCADA and some other trends. The latter means that the overall importance of the distribution networks is increasing. The slowing down of load-growth has often made network reinforcements unprofitable. Thus the existing network must be operated more efficiently. At the same time larger distribution areas are for economical reasons being monitored at one control center and the size of the operation staff is decreasing. The quality of supply requirements are also becoming stricter. The needed data for new applications is mainly available in some existing systems. Thus the computer systems of utilities must be integrated. The main data source for the new applications in the control center are the AM/FM/GIS (i.e. the network database system), the SCADA, and the customer information system (CIS). The new functions can be embedded in some existing computer system. This means a strong dependency on the vendor of the existing system. An alternative strategy is to develop an independent system which is integrated with other computer systems using well-defined interfaces. The latter approach makes it possible to use the new applications in various computer environments, having only a weak dependency on the

  1. Management Information System

    Science.gov (United States)

    1984-01-01

    New Automated Management Information Center (AMIC) employs innovative microcomputer techniques to create color charts, viewgraphs, or other data displays in a fraction of the time formerly required. Developed under Kennedy Space Center's contract by Boeing Services International Inc., Seattle, WA, AMIC can produce an entirely new informational chart in 30 minutes, or an updated chart in only five minutes. AMIC also has considerable potential as a management system for business firms.

  2. Rationalization and sensemaking in care management: an experience of change in a hospital of the SUS (Unified Health System).

    Science.gov (United States)

    Azevedo, Creuza da Silva; Sá, Marilene de Castilho; Cunha, Marcela; Matta, Gustavo Correa; Miranda, Lilian; Grabois, Victor

    2017-06-01

    This study aimed to analyze organizational processes of change in the hospital care management by using qualitative evaluation developed in the case study. The study was developed at the Hospital Fornecedores de Cana de Piracicaba, in São Paulo State, Brazil, in September and October of 2012. There were 25 interviews with members of the senior board of directors of the hospital, managers and health professionals linked to healthcare of adults, in addition to the analysis of managerial documents and observations of some activities. In this article it is analyzed part of the results, dividing the organizational change in three axes: the planning process developed in the healthcare sectors; The protocol/creation of assisted routines in order to obtain better efficiency and safety for the patient; and the work of hospitalist physicians. The study highlights the complexity of the processes of change in the care management sphere in hospitals and the dynamism between a given management concept and its rational tools and the subjects and groups that seek, in the micropolitic and intersubjective processes, meanings to their practices.

  3. Utilizing Immersive Visualization Systems: How to Dynamically Revolutionize Site-based Professional Development Experiences within Human Resources Management?

    Science.gov (United States)

    Craft, Kirby A.

    2009-01-01

    How can we train today's workforce with innovative technologies when families are surrounded by state-of-the-art video games and high-definition televisions? Human resource managers and administrators are faced with difficult challenges to prepare beneficial and relevant professional development exercises that engage the minds of their employees.…

  4. Pickering tool management system

    International Nuclear Information System (INIS)

    Wong, E.H.; Green, A.H.

    1997-01-01

    Tools were being deployed in the station with no process in effect to ensure that they are maintained in good repair so as to effectively support the performance of Maintenance activities. Today's legal requirements require that all employers have a process in place to ensure that tools are maintained in a safe condition. This is specified in the Ontario Health and Safety Act. The Pickering Tool Management System has been chosen as the process at Pickering N.D to manage tools. Tools are identified by number etching and bar codes. The system is a Windows application installed on several file servers

  5. Integrated management system

    International Nuclear Information System (INIS)

    Florescu, N.

    2003-01-01

    A management system is developed in order to reflect the needs of the business and to ensure that the objectives of the organization will be achieved. The process model and each individual process within the system then needs to identify the drives or requirements from external customers and stakeholders, regulations, and standards such as ISO and 50-C-Q. The processes are then developed to address these drivers. Developing the process in this way makes it fully integrated and capable of incorporating any new requirements. The International Standard (ISO 9000:2000) promotes the adoption of a process approach when developing, implementing and improving the effectiveness of a quality management system to enhance customer satisfaction by meeting customer requirements. The IAEA Code recognizes that the entire work is a process which can be planned, assessed and improved. For an organization to function effectively, numerous linked activities have to be identified and managed. By definition a process is an activity that using resources and taking into account all the constraints imposed executes the necessary operations which transform the inputs in outcomes. Running a system of processes within an organization, identification of the interaction between the processes and their management can be referred to as a 'process approach'. The advantage of such an approach is the ensuring of the ongoing control over the linkage between the individual processes composing the system as well as over their combination and interaction. Developing a management system implies: identification of the process which delivers Critical Success Factor (CSFs) of the business; identifying the support processes enabling the CSFs to be accomplished; identifying the processes that deliver the business fundamentals. An integrated management system should include all activities not only those related to Quality, Health and Safety. When developing an IMS it is necessary to identify all of the drivers

  6. DISEASE MANAGEMENT INFORMATION SYSTEM

    OpenAIRE

    Bens Pardamean; Anindito; Anjela Djoeang; Nana Tobing

    2013-01-01

    The study designed an information system model for Disease Management (DisMan) that met the specifications and needs of a consumer electronics manufacturer. The diseases monitored by this study were diabetes, hypertension and tuberculosis. Data were collected through interviews with the companyâs human resources department and occupational health provider. As for the model, literature and online research were conducted to collect health standards and information system standards on existing D...

  7. Pollution management system

    DEFF Research Database (Denmark)

    2015-01-01

    A pollution management system comprises an array of one or more inlets and at least one outlet. The one or more inlets are arranged to collect polluted air and supply said polluted air to a polluted air treatment element. The one or more inlets each comprise a respective inlet sensor for measuring...

  8. Visual management support system

    Science.gov (United States)

    Lee Anderson; Jerry Mosier; Geoffrey Chandler

    1979-01-01

    The Visual Management Support System (VMSS) is an extension of an existing computer program called VIEWIT, which has been extensively used by the U. S. Forest Service. The capabilities of this program lie in the rapid manipulation of large amounts of data, specifically opera-ting as a tool to overlay or merge one set of data with another. VMSS was conceived to...

  9. Experimental lithium system experience

    International Nuclear Information System (INIS)

    Atwood, J.M.; Berg, J.D.; Kolowith, R.; Miller, W.C.

    1984-01-01

    The Experimental Lithium System is a test loop built to support design and operation of the Fusion Materials Irradiation Test Facility. ELS has achieved over 15,000 hours of safe and reliable operation. An extensive test program has demonstrated satisfactory performance of the system components, including an electromagnetic pump, lithium jet target, and vacuum system. Data on materials corrosion and behavior of lithium impurities are also presented. (author)

  10. Smart energy management system

    Science.gov (United States)

    Desai, Aniruddha; Singh, Jugdutt

    2010-04-01

    Peak and average energy usage in domestic and industrial environments is growing rapidly and absence of detailed energy consumption metrics is making systematic reduction of energy usage very difficult. Smart energy management system aims at providing a cost-effective solution for managing soaring energy consumption and its impact on green house gas emissions and climate change. The solution is based on seamless integration of existing wired and wireless communication technologies combined with smart context-aware software which offers a complete solution for automation of energy measurement and device control. The persuasive software presents users with easy-to-assimilate visual cues identifying problem areas and time periods and encourages a behavioural change to conserve energy. The system allows analysis of real-time/statistical consumption data with the ability to drill down into detailed analysis of power consumption, CO2 emissions and cost. The system generates intelligent projections and suggests potential methods (e.g. reducing standby, tuning heating/cooling temperature, etc.) of reducing energy consumption. The user interface is accessible using web enabled devices such as PDAs, PCs, etc. or using SMS, email, and instant messaging. Successful real-world trial of the system has demonstrated the potential to save 20 to 30% energy consumption on an average. Low cost of deployment and the ability to easily manage consumption from various web enabled devices offers gives this system a high penetration and impact capability offering a sustainable solution to act on climate change today.

  11. Air System Information Management

    Science.gov (United States)

    Filman, Robert E.

    2004-01-01

    I flew to Washington last week, a trip rich in distributed information management. Buying tickets, at the gate, in flight, landing and at the baggage claim, myriad messages about my reservation, the weather, our flight plans, gates, bags and so forth flew among a variety of travel agency, airline and Federal Aviation Administration (FAA) computers and personnel. By and large, each kind of information ran on a particular application, often specialized to own data formats and communications network. I went to Washington to attend an FAA meeting on System-Wide Information Management (SWIM) for the National Airspace System (NAS) (http://www.nasarchitecture.faa.gov/Tutorials/NAS101.cfm). NAS (and its information infrastructure, SWIM) is an attempt to bring greater regularity, efficiency and uniformity to the collection of stovepipe applications now used to manage air traffic. Current systems hold information about flight plans, flight trajectories, weather, air turbulence, current and forecast weather, radar summaries, hazardous condition warnings, airport and airspace capacity constraints, temporary flight restrictions, and so forth. Information moving among these stovepipe systems is usually mediated by people (for example, air traffic controllers) or single-purpose applications. People, whose intelligence is critical for difficult tasks and unusual circumstances, are not as efficient as computers for tasks that can be automated. Better information sharing can lead to higher system capacity, more efficient utilization and safer operations. Better information sharing through greater automation is possible though not necessarily easy.

  12. Integrated management systems

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Remmen, Arne; Mellado, M. Dolores

    2006-01-01

    of integration. The focus of the article is primarily to discuss three ambition levels of integration: from increased compatibility of system elements over coordination of generic processes to an embeddedness of an integrated management system (IMS) in a culture of learning and continuous improvements......Different approaches to integration of management systems (ISO 9001, ISO 14001, OHSAS 18001 and SA 8000) with various levels of ambition have emerged. The tendency of increased compatibility between these standards has paved the road for discussions of, how to understand the different aspects....... At present, national IMS standards are being developed, and the IMS standards in Denmark and Spain are being analysed regarding the ambition level for integration. Should the ISO organisation decide to make a standard for IMS, then it would be necessary to consider the different levels of integration...

  13. SNAKEBITE MANAGEMENT: Experiences From Gulu Regional ...

    African Journals Online (AJOL)

    Background: The objective of this study was to document our experience with supportive therapy without antivenom in snakebite management. Methods: In a prospective study undertaken at Gulu Regional Hospital, Northern Uganda from January to. December 2002 the outcome of supportive therapy in management of 108 ...

  14. Knowledge Management Experience in Kosovo Organizations

    OpenAIRE

    MSc. Drita Kacandolli-Gjonbalaj; MSc. Anera Alishani; MSc. Arber Reci

    2014-01-01

    This paper is an empirical study, the findings of which reflect the experience gathered in knowledge management in Kosovo organizations. The main goal of this paper was to identify the realistic situation, and recommend instruments for a more effective knowledge management in Kosovo organizations. The findings of the empirical study have found inefficiency in knowledge management by organizations in Kosovo. A research was undertaken for this study, thereby directly interviewing representative...

  15. Mastering the management system.

    Science.gov (United States)

    Kaplan, Robert S; Norton, David P

    2008-01-01

    Companies have always found it hard to balance pressing operational concerns with long-term strategic priorities. The tension is critical: World-class processes won't lead to success without the right strategic direction, and the best strategy in the world will get nowhere without strong operations to execute it. In this article, Kaplan, of Harvard Business School, and Norton, founder and director of the Palladium Group, explain how to effectively manage both strategy and operations by linking them tightly in a closed-loop management system. The system comprises five stages, beginning with strategy development, which springs from a company's mission, vision, and value statements, and from an analysis of its strengths, weaknesses, and competitive environment. In the next stage, managers translate the strategy into objectives and initiatives with strategy maps, which organize objectives by themes, and balanced scorecards, which link objectives to performance metrics. Stage three involves creating an operational plan to accomplish the objectives and initiatives; it includes targeting process improvements and preparing sales, resource, and capacity plans and dynamic budgets. Managers then put plans into action, monitoring their effectiveness in stage four. They review operational, environmental, and competitive data; assess progress; and identify barriers to execution. In the final stage, they test the strategy, analyzing cost, profitability, and correlations between strategy and performance. If their underlying assumptions appear faulty, they update the strategy, beginning another loop. The authors present not only a comprehensive blueprint for successful strategy execution but also a managerial tool kit, illustrated with examples from HSBC Rail, Cigna Property and Casualty, and Store 24. The kit incorporates leading management experts' frameworks, outlining where they fit into the management cycle.

  16. Systems approach in energy management

    International Nuclear Information System (INIS)

    Dutta-Choudhury, K.

    1993-01-01

    Several years ago when the author was working in the chemicals division of a paper company in Instrumentation and Controls, one experience had a lasting impact on his work approach which is systems approach. The maintenance manager told the author that a very important piece of boiler instrument of the power plant had broken down and delivery of the replacement needed to be expedited. The instrument was ordered over the phone in another city. The purchase order was personally delivered at the supplier's office and arrangements were made so the instrument was put on the next flight. A week later the maintenance manager indicated that the particular instrument still had not arrived in the plant and he could not run the power plant. Thus the company incurred substantial losses. Further inquiries showed that the instrument did indeed arrive at the plant stores on time. But, in the absence of any instructions thereon, the instrument was not delivered to the power plant. The sense of urgency was lost in the existing delivery process. In other words, the process or system failed. The whole process from requisitioning to delivery of ordered items was analyzed and corrective procedures were incorporated to prevent future repetitions. This brings up the subject of systems approach in engineering management in general and energy management in particular. This involves defining an objective and designing a system for an effective way of getting there

  17. Verification Account Management System (VAMS)

    Data.gov (United States)

    Social Security Administration — The Verification Account Management System (VAMS) is the centralized location for maintaining SSA's verification and data exchange accounts. VAMS account management...

  18. HLT configuration management system

    CERN Document Server

    Daponte, Vincenzo

    2015-01-01

    The CMS High Level Trigger (HLT) is implemented running a streamlined version of the CMS offline reconstruction software running on thousands of CPUs. The CMS software is written mostly in C++, using Python as its configuration language through an embedded CPython interpreter. The configuration of each process is made up of hundreds of modules, organized in sequences and paths. As an example, the HLT configurations used for 2011 data taking comprised over 2200 different modules, organized in more than 400 independent trigger paths. The complexity of the HLT configurations and the large number of configuration produced require the design of a suitable data management system. The present work describes the designed solution to manage the considerable number of configurations developed and to assist the editing of new configurations. The system is required to be remotely accessible and OS-independent as well as easly maintainable easy to use. To meet these requirements a three-layers architecture has been choose...

  19. Some Issues on Management Information System Course Teaching

    OpenAIRE

    Chen, Dingquan

    2008-01-01

    This paper discuses the following issues about Management Information System course for the major of information management & Information System: Teaching Object, the difference between Information System Analysis and Design course, teaching content, and experiment plan.

  20. The self-reliant system for alternative care of diabetes mellitus patients--experience macrobiotic management in Trad Province.

    Science.gov (United States)

    Bhumisawasdi, Jakkriss; Vanna, Opas; Surinpang, Nuanchan

    2006-12-01

    Diabetes mellitus is a costly and growing health issue for the individual as well as the nation with much concern needed to change the way of life globally, Thailand included. Conventional medical care comprises of lifestyle modifications and the use of diabetic drugs but even with the development of new drugs, little achievement has been noted in relation to reducing the disease's complications. Macrobiotic is a holistic, alternative health care method. In macrobiotic principle, humans should live, drink and eat in conjunction with the laws of nature that will lead to good health, freedom and wisdom in understanding the laws of nature. The macrobiotic way of living is therefore the caring of body, mind, spirit and the environment in an independent manner based on adequacy and symbiotic support. The present study consists of forty-four type 2 diabetes mellitus patients from the DM clinic, Trad Provincial Hospital. 4 subjects were insulin treated, observing the macrobiotic ways of living together at the Wanakaset Research Facility of Kasetsart University, Trad Province which lies in a natural forest area approximately 45 kilometers away from the city for a period of between 2 to 14 weeks. The volunteers were required to refrain from using all kind of drugs or chemicals and eating Formula 2 food as set forth by the International Un Punto Macrobiotico Foundation, Italy while participating in all camp activities. The findings at the end of the program together with QOL assessment questionnaires noted a statistically significant reduction in blood sugar levels, weight, blood pressure and heart beat ratios. Subjects were in significantly better health, more vibrant, more peaceful, and more energetic. The 4 insulin treated volunteers managed to maintain their blood sugar level within the range of 110-171 mg% without any insulin injection and all volunteers are free of any adverse events. The results of the present study can be a guideline in the modification of health

  1. Environmental management systems in South-Africa

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg; Smink, Carla Kornelia

    2003-01-01

    The paper presents and discusses some of the empirical findings regarding envi-ronmental management systems (EMS) of four companies in the automotive industry in South Africa and compares some of the findings to Danish and international experiences.......The paper presents and discusses some of the empirical findings regarding envi-ronmental management systems (EMS) of four companies in the automotive industry in South Africa and compares some of the findings to Danish and international experiences....

  2. ATHLET validation using accident management experiments

    Energy Technology Data Exchange (ETDEWEB)

    Teschendorff, V.; Glaeser, H.; Steinhoff, F. [Gasellschaft fuer Anlagen - und Reaktorsicherheit (GSR) mbH, Garching (Germany)

    1995-09-01

    The computer code ATHLET is being developed as an advanced best-estimate code for the simulation of leaks and transients in PWRs and BWRs including beyond design basis accidents. The code has features that are of special interest for applications to small leaks and transients with accident management, e.g. initialisation by a steady-state calculation, full-range drift-flux model, and dynamic mixture level tracking. The General Control Simulation Module of ATHLET is a flexible tool for the simulation of the balance-of-plant and control systems including the various operator actions in the course of accident sequences with AM measures. The systematic validation of ATHLET is based on a well balanced set of integral and separate effect tests derived from the CSNI proposal emphasising, however, the German combined ECC injection system which was investigated in the UPTF, PKL and LOBI test facilities. PKL-III test B 2.1 simulates a cool-down procedure during an emergency power case with three steam generators isolated. Natural circulation under these conditions was investigated in detail in a pressure range of 4 to 2 MPa. The transient was calculated over 22000 s with complicated boundary conditions including manual control actions. The calculations demonstrations the capability to model the following processes successfully: (1) variation of the natural circulation caused by steam generator isolation, (2) vapour formation in the U-tubes of the isolated steam generators, (3) break-down of circulation in the loop containing the isolated steam generator following controlled cool-down of the secondary side, (4) accumulation of vapour in the pressure vessel dome. One conclusion with respect to the suitability of experiments simulating AM procedures for code validation purposes is that complete documentation of control actions during the experiment must be available. Special attention should be given to the documentation of operator actions in the course of the experiment.

  3. Experiment and simulation of a LiFePO4 battery pack with a passive thermal management system using composite phase change material and graphite sheets

    Science.gov (United States)

    Lin, Chunjing; Xu, Sichuan; Chang, Guofeng; Liu, Jinling

    2015-02-01

    A passive thermal management system (TMS) for LiFePO4 battery modules using phase change material (PCM) as the heat dissipation source to control battery temperature rise is developed. Expanded graphite matrix and graphite sheets are applied to compensate low thermal conductivity of PCM and improve temperature uniformity of the batteries. Constant current discharge and mixed charge-discharge duties were applied on battery modules with and without PCM on a battery thermal characteristics test platform. Experimental results show that PCM cooling significantly reduces the battery temperature rise during short-time intense use. It is also found that temperature uniformity across the module deteriorates with the increasing of both discharge time and current rates. The maximum temperature differences at the end of 1C and 2C-rate discharges are both less than 5 °C, indicating a good performance in battery thermal uniformity of the passive TMS. Experiments on warm-keeping performance show that the passive TMS can effectively keep the battery within its optimum operating temperature for a long time during cold weather uses. A three dimensional numerical model of the battery pack with the passive TMS was conducted using ANSYS Fluent. Temperature profiles with respect to discharging time reveal that simulation shows good agreement with experiment at 1C-discharge rate.

  4. The UN System for Environmental-Economic Accounts for Water (SEEA-W and groundwater management: the experience of the Arno River Basin Authority within the PAWA project

    Directory of Open Access Journals (Sweden)

    Bernardo Mazzanti

    2014-09-01

    Full Text Available The Pilot Arno Water Accounts (PAWA project was recently funded under the Call “Preparatory Action on Development of Prevention Activities to Halt Desertification in Europe” of the Directorate- General for the Environment of the European Commission to promote preventive actions to manage water scarcity and drought phenomena and to meet one of the main goals under European environmental legislation: the effective and sustainable management of water resources. The partners involved in the implementation of the PAWA project (ISPRA, Arno River Basin Authority, SEMIDE/EMWIS will carry out a pilot initiative in the Arno River Basin, an area severely affected by water scarcity and droughts phenomena and characterized by water withdrawals and land use changes. In the area a large experience about water balance application was already performed, for example in the context of the Water Framework Directive Common Implementation Strategy. Moving from this knowledge, the objective of the project is the definition of water accounting processing based on the UN System of Environmental Economic Accounts for Water, with the final goal to optimize a list of effective measures to face water scarcity phenomena. By the end of project (March 2015 the PAWA partnership aims at preparing physical water stock accounts, using the best available data resulting from field measurements or models, on a monthly step for the period 1999–201. The quality of each dataset will be assessed; tables, maps and graphs will be produced as outputs of the projects in cooperation with local stakeholders and players of the water sector. Furthermore, water accounts will be used to assess the potential impact of various measures related to water resource efficient exploitation in the most vulnerable sub-basins; their tolerability will be tested during workshops with stakeholders. Finally, water efficiency targets for potential future integration into Arno River Basin Management Plan

  5. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  6. Simulator configuration management system

    International Nuclear Information System (INIS)

    Faulent, J.; Brooks, J.G.

    1990-01-01

    The proposed revisions to ANS 3.5-1985 (Section 5) require Utilities to establish a simulator Configuration Management System (CMS). The proposed CMS must be capable of: Establishing and maintaining a simulator design database. Identifying and documenting differences between the simulator and its reference plant. Tracking the resolution of identified differences. Recording data to support simulator certification, testing and maintenance. This paper discusses a CMS capable of meeting the proposed requirements contained in ANS 3.5. The system will utilize a personal computer and a relational database management software to construct a simulator design database. The database will contain records to all reference nuclear plant data used in designing the simulator, as well as records identifying all the software, hardware and documentation making up the simulator. Using the relational powers of the database management software, reports will be generated identifying the impact of reference plant changes on the operation of the simulator. These reports can then be evaluated in terms of training needs to determine if changes are required for the simulator. If a change is authorized, the CMS will track the change through to its resolution and then incorporate the change into the simulator design database

  7. Programmatic risk management system

    Energy Technology Data Exchange (ETDEWEB)

    Mahn, J. [Sandia National Labs., Albuquerque, NM (United States); Wood, C.L. [Automated Solutions of Albuquerque, NM (United States)

    1996-07-01

    The purpose of the Programmatic Risk Management System (PRMS) is to evaluate and manage potential risks associated with proposed projects (i.e., new products or processes, or possible research and technological development projects). Although the PRMS considers some technical aspects of risk, the primary focus of the methodology is programmatic risk. That is, the methodology permits an assessment of risks associated with such issues as the ability to successfully produce a product that performs in accordance with all customer requirements, and the availability and allocation of resources (money, equipment, facilities, skilled personnel). The PRMS process consists of five formalized activities that are essential for effective management of risks associated with proposed projects. These activities include risk assessment, development of appropriate risk mitigation strategies, estimating strategy implementation cost, ranking of risk mitigation strategies for resource allocation, and scheduling of strategy implementing. The PRMS utilizes a ranking system that allows the user to identify the most cost-effective investment of resources of minimizing risk.

  8. Bank Customers Management System

    Directory of Open Access Journals (Sweden)

    Ebubeogu Amarachukwu Felix

    2015-08-01

    Full Text Available ABSTRACT The purpose of this project is in partial fulfilment of the requirements of Bachelor of Science Hon in Information Technology. The Design and development of this Bank customers Management system provides a more secured approach in managing bank customers information which strengthens the relationships between banks and their customers by providing the right solutions that uses a multi-level security to improve customer satisfaction. The technology used in developing this project is ASP.NET and the programming language used to develop this project is C and the IDE used is Microsoft Visual Studio 2013 professional in designing the front end while the back end uses Microsoft SQL Server 2012.

  9. Integrated Building Management System (IBMS)

    Energy Technology Data Exchange (ETDEWEB)

    Anita Lewis

    2012-07-01

    This project provides a combination of software and services that more easily and cost-effectively help to achieve optimized building performance and energy efficiency. Featuring an open-platform, cloud- hosted application suite and an intuitive user experience, this solution simplifies a traditionally very complex process by collecting data from disparate building systems and creating a single, integrated view of building and system performance. The Fault Detection and Diagnostics algorithms developed within the IBMS have been designed and tested as an integrated component of the control algorithms running the equipment being monitored. The algorithms identify the normal control behaviors of the equipment without interfering with the equipment control sequences. The algorithms also work without interfering with any cooperative control sequences operating between different pieces of equipment or building systems. In this manner the FDD algorithms create an integrated building management system.

  10. Management Information Systems at CERN

    OpenAIRE

    Ferguson, J

    1986-01-01

    The specific areas addressed in the study are 1.Management decision support (data presentation, data base management systems â" DBMS, modeling) 2.Text processing, 3.Electronic communication for management purposes, 4.Office automation, 5.Administrative use of Management Information Systems (MIS) and in particular Administrative Data Processing (ADP).

  11. The psychosocial work environment and certified occupational health and safety management systems in the public sector – experience from two Danish municipalities

    DEFF Research Database (Denmark)

    Hasle, Peter; Hohnen, Pernille; Helbo, Anne

    2014-01-01

    Certified occupational health and safety management (OHSM) systems are expected to cover the psychosocial work environment. We studied certified OHSM systems implemented in two medium-sized to large Danish municipalities. The cases show that the process of adopting OHSM systems from...

  12. Remedial action graphics management system

    International Nuclear Information System (INIS)

    Madson, M.E.

    1987-01-01

    The objective of the Graphics Management System is to provide a visual display of the Grand Junction vicinities properties status as a cost effective management tool. Capabilities of the system are listed and a series of sample displays are presented

  13. Clinicians’ experiences of becoming a clinical manager: a qualitative study

    Directory of Open Access Journals (Sweden)

    Spehar Ivan

    2012-11-01

    Full Text Available Abstract Background There has been an increased interest in recruiting health professionals with a clinical background to management positions in health care. We know little about the factors that influence individuals’ decisions to engage in management. The aim of this study is to explore clinicians’ journeys towards management positions in hospitals, in order to identify potential drivers and barriers to management recruitment and development. Methods We did a qualitative study which included in-depth interviews with 30 clinicians in middle and first-line management positions in Norwegian hospitals. In addition, participant observation was conducted with 20 of the participants. The informants were recruited from medical and surgical departments, and most had professional backgrounds as medical doctors or nurses. Interviews were analyzed by systemic text condensation. Results We found that there were three phases in clinicians’ journey into management; the development of leadership awareness, taking on the manager role and the experience of entering management. Participants’ experiences suggest that there are different journeys into management, in which both external and internal pressure emerged as a recurrent theme. They had not anticipated a career in clinical management, and experienced that they had been persuaded to take the position. Being thrown into the position, without being sufficiently prepared for the task, was a common experience among participants. Being left to themselves, they had to learn management “on the fly”. Some were frustrated in their role due to increasing administrative workloads, without being able to delegate work effectively. Conclusions Path dependency and social pressure seems to influence clinicians’ decisions to enter into management positions. Hospital organizations should formalize pathways into management, in order to identify, attract, and retain the most qualified talents. Top managers

  14. Customer Experience Management and Business Performance

    DEFF Research Database (Denmark)

    Grønholdt, Lars; Martensen, Anne; Jørgensen, Stig

    2014-01-01

    Purpose – The purpose of this paper is to examine how essential dimensions of customer experience management (CEM) drive business performance in Danish companies. Methodology/approach – An empirical study is conducted to investigate the relationships between seven CEM dimensions, differentiation...

  15. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  16. A Multiagent System for Distributed Systems Management

    OpenAIRE

    H. M. Kelash; H. M. Faheem; M. Amoon

    2007-01-01

    The demand for autonomous resource management for distributed systems has increased in recent years. Distributed systems require an efficient and powerful communication mechanism between applications running on different hosts and networks. The use of mobile agent technology to distribute and delegate management tasks promises to overcome the scalability and flexibility limitations of the currently used centralized management approach. This work proposes a multiagent s...

  17. End-to-end experiment management in HPC

    Energy Technology Data Exchange (ETDEWEB)

    Bent, John M [Los Alamos National Laboratory; Kroiss, Ryan R [Los Alamos National Laboratory; Torrez, Alfred [Los Alamos National Laboratory; Wingate, Meghan [Los Alamos National Laboratory

    2010-01-01

    Experiment management in any domain is challenging. There is a perpetual feedback loop cycling through planning, execution, measurement, and analysis. The lifetime of a particular experiment can be limited to a single cycle although many require myriad more cycles before definite results can be obtained. Within each cycle, a large number of subexperiments may be executed in order to measure the effects of one or more independent variables. Experiment management in high performance computing (HPC) follows this general pattern but also has three unique characteristics. One, computational science applications running on large supercomputers must deal with frequent platform failures which can interrupt, perturb, or terminate running experiments. Two, these applications typically integrate in parallel using MPI as their communication medium. Three, there is typically a scheduling system (e.g. Condor, Moab, SGE, etc.) acting as a gate-keeper for the HPC resources. In this paper, we introduce LANL Experiment Management (LEM), an experimental management framework simplifying all four phases of experiment management. LEM simplifies experiment planning by allowing the user to describe their experimental goals without having to fully construct the individual parameters for each task. To simplify execution, LEM dispatches the subexperiments itself thereby freeing the user from remembering the often arcane methods for interacting with the various scheduling systems. LEM provides transducers for experiments that automatically measure and record important information about each subexperiment; these transducers can easily be extended to collect additional measurements specific to each experiment. Finally, experiment analysis is simplified by providing a general database visualization framework that allows users to quickly and easily interact with their measured data.

  18. Customer Experience Management and Business Performance

    DEFF Research Database (Denmark)

    Grønholdt, Lars; Martensen, Anne Duhr; Jørgensen, Stig

    2015-01-01

    Purpose: – The purpose of this paper is to examine how essential dimensions of customer experience management (CEM) drive business performance in Danish companies. Design/methodology/approach: – An empirical study is conducted to investigate the relationships between seven CEM dimensions, differe......Purpose: – The purpose of this paper is to examine how essential dimensions of customer experience management (CEM) drive business performance in Danish companies. Design/methodology/approach: – An empirical study is conducted to investigate the relationships between seven CEM dimensions...... customer experience into their products and service enjoy measurable financial success. Research limitations/implications: – This study is limited to the seven identified CEM dimensions in Danish companies. Practical implications: – This study has clear implications in terms of identifying and measuring...

  19. Panel management, team culture, and worklife experience.

    Science.gov (United States)

    Willard-Grace, Rachel; Dubé, Kate; Hessler, Danielle; O'Brien, Bridget; Earnest, Gillian; Gupta, Reena; Shunk, Rebecca; Grumbach, Kevin

    2015-09-01

    Burnout and professional dissatisfaction are threats to the primary care workforce. We investigated the relationship between panel management capability, team culture, cynicism, and perceived "do-ability" of primary care among primary care providers (PCPs) and staff in primary care practices. We surveyed 326 PCPs and 142 staff members in 10 county-administered, 6 university-run, and 3 Veterans Affairs primary care clinics in a large urban area in 2013. Predictor variables included capability for performing panel management and perception of team culture. Outcome variables included 2 work experience measures--the Maslach Burnout Inventory cynicism scale and a 1-item measure of the "do-ability" of primary care this year compared with last year. Generalized Estimation Equation (GEE) models were used to account for clustering at the clinic level. Greater panel management capability and higher team culture were associated with lower cynicism among PCPs and staff and higher reported "do-ability" of primary care among PCPs. Panel management capability and team culture interacted to predict the 2 work experience outcomes. Among PCPs and staff reporting high team culture, there was little association between panel management capability and the outcomes, which were uniformly positive. However, there was a strong relationship between greater panel management capability and improved work experience outcomes for PCPs and staff reporting low team culture. Team-based processes of care such as panel management may be an important strategy to protect against cynicism and dissatisfaction in primary care, particularly in settings that are still working to improve their team culture. (c) 2015 APA, all rights reserved).

  20. Cryptographic Key Management System

    Energy Technology Data Exchange (ETDEWEB)

    No, author

    2014-02-21

    This report summarizes the outcome of U.S. Department of Energy (DOE) contract DE-OE0000543, requesting the design of a Cryptographic Key Management System (CKMS) for the secure management of cryptographic keys for the energy sector infrastructure. Prime contractor Sypris Electronics, in collaboration with Oak Ridge National Laboratories (ORNL), Electric Power Research Institute (EPRI), Valicore Technologies, and Purdue University's Center for Education and Research in Information Assurance and Security (CERIAS) and Smart Meter Integration Laboratory (SMIL), has designed, developed and evaluated the CKMS solution. We provide an overview of the project in Section 3, review the core contributions of all contractors in Section 4, and discuss bene ts to the DOE in Section 5. In Section 6 we describe the technical construction of the CKMS solution, and review its key contributions in Section 6.9. Section 7 describes the evaluation and demonstration of the CKMS solution in different environments. We summarize the key project objectives in Section 8, list publications resulting from the project in Section 9, and conclude with a discussion on commercialization in Section 10 and future work in Section 11.

  1. ENVIRONMENTAL MANAGEMENT SYSTEMS CERTIFICATION

    Directory of Open Access Journals (Sweden)

    Aniko Miler-Virc

    2012-12-01

    Full Text Available ISO 14001 prescribes the requirements for a system, not environmental performance itself. Similarly, certification is of the management system itself, not environmental performance. An audit is not conducted to ascertain whether your flue gas emissions are less than X part per million nitrous oxide or that your wastewater effluent contains less that Y milligrams of bacteria per litre. Consequently, the procces of auditing the system for compliance to the standard entails checking to see that all of the necessary components of a functioning system are present and working properly.           A company can have a complete and fully functional EMS as prescribed by ISO 14001 without being certified. As certification can add to the time and expense of EMS development, it is important for you to establish, in advance, whether certification is of net benefit to you. Although most companies that develop an EMS do in fact certify, there are cases where certification does not add immediate value. Certification is not always beneficial to small and medium sized companies. Certification is not always necessary for companies with one or two large clients with environmental demands who are satisfied that you have a functional EMS (second-party declaration. Whatever decision you make, it is important to remember that just as a driver′s licence does not automatically make you a good driver, ISO 14001 certification does not automatically make your company environmentally benign or ensure that you will continually improve environmental performance. The system is only as good as the people who operate it.

  2. Supplier Management System

    Science.gov (United States)

    Ramirez, Eric; Gutheinz, Sandy; Brison, James; Ho, Anita; Allen, James; Ceritelli, Olga; Tobar, Claudia; Nguyen, Thuykien; Crenshaw, Harrel; Santos, Roxann

    2008-01-01

    Supplier Management System (SMS) allows for a consistent, agency-wide performance rating system for suppliers used by NASA. This version (2.0) combines separate databases into one central database that allows for the sharing of supplier data. Information extracted from the NBS/Oracle database can be used to generate ratings. Also, supplier ratings can now be generated in the areas of cost, product quality, delivery, and audit data. Supplier data can be charted based on real-time user input. Based on these individual ratings, an overall rating can be generated. Data that normally would be stored in multiple databases, each requiring its own log-in, is now readily available and easily accessible with only one log-in required. Additionally, the database can accommodate the storage and display of quality-related data that can be analyzed and used in the supplier procurement decision-making process. Moreover, the software allows for a Closed-Loop System (supplier feedback), as well as the capability to communicate with other federal agencies.

  3. Do managers experience more stress than employees?

    DEFF Research Database (Denmark)

    Skakon, Janne; Kristensen, Tage S.; Christensen, Karl Bang

    2011-01-01

    -significant with regards to behavioural, somatic and cognitive stress. The difference was partly explained by higher scores in the psychosocial work environment factors; job satisfaction, perceived management quality from their managers, influence, degrees of freedom at work, possibilities for development and meaning......Aim: To examine whether managers’ perceived stress and work strain is higher than perceived stress and work strain among employees. Methods: The study is based on questionnaire responses from 2052 respondents (128 managers and 1924 employees) at 48 worksites. Bi-variate and multivariate analyses...... were used to explain possible differences in stress levels and related mediators. Results: Managers experienced higher demands, higher level of conflicts, and lower degree of social support from peers. They tended to experience significantly lower emotional stress, whereas this trend was non...

  4. Computerized training management system

    Energy Technology Data Exchange (ETDEWEB)

    Rice, Harold B. (Franklin Furnace, OH); McNair, Robert C. (East Setauket, NY); White, Kenneth (Shirley, NY); Maugeri, Terry (Wading River, NY)

    1998-08-04

    A Computerized Training Management System (CTMS) for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base.RTM., an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches.

  5. Computerized training management system

    Energy Technology Data Exchange (ETDEWEB)

    Rice, H.B.; McNair, R.C.; White, K.; Maugeri, T.

    1998-08-04

    A Computerized Training Management System (CTMS) is disclosed for providing a procedurally defined process that is employed to develop accreditable performance based training programs for job classifications that are sensitive to documented regulations and technical information. CTMS is a database that links information needed to maintain a five-phase approach to training-analysis, design, development, implementation, and evaluation independent of training program design. CTMS is designed using R-Base{trademark}, an-SQL compliant software platform. Information is logically entered and linked in CTMS. Each task is linked directly to a performance objective, which, in turn, is linked directly to a learning objective; then, each enabling objective is linked to its respective test items. In addition, tasks, performance objectives, enabling objectives, and test items are linked to their associated reference documents. CTMS keeps all information up to date since it automatically sorts, files and links all data; CTMS includes key word and reference document searches. 18 figs.

  6. Combat Agility Management System (CAMS)

    Science.gov (United States)

    Skow, Andrew; Porada, William

    1994-01-01

    The proper management of energy becomes a complex task in fighter aircraft which have high angle of attack (AOA) capability. Maneuvers at high AOA are accompanied by high bleed rates (velocity decrease), a characteristic that is usually undesirable in a typical combat arena. Eidetics has developed under NASA SBIR Phase 1 and NAVAIR SBIR Phase 2 contracts a system which allows a pilot to more easily and effectively manage the trade-off of energy (airspeed or altitude) for turn rate while not imposing hard limits on the high AOA nose pointing capability that can be so important in certain air combat maneuver situations. This has been accomplished by incorporating a two-stage angle of attack limiter into the flight control laws. The first stage sets a limit on AOA to achieve a limit on the maximum bleed rate (selectable) by limiting AOA to values which are dependent on the aircraft attitude and dynamic pressure (or flight path, velocity, and altitude). The second stage sets an AOA limit near the AOA for C(sub l max). One of the principal benefits of such a system is that it enables a low-experience pilot to become much more proficient at managing his energy. The Phase 2 simulation work is complete, and an exploratory flight test on the F-18 HARV is planned for the Fall of 1994 to demonstrate/validate the concept.

  7. Changeability of production management systems

    NARCIS (Netherlands)

    Hoogenraad, M. S.; Wortmann, J. C.; Olhager, J; Persson, F

    2007-01-01

    Modem production management systems consist of transaction processing systems and decision enhancement systems. A clear example of two such components are an ERP systems and APS systems. These systems are often standard software systems, and therefore suitable for many different situations. This

  8. Manpower management information system /MIS/

    Science.gov (United States)

    Gravette, M. C.; King, W. L.

    1971-01-01

    System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

  9. System management and quality assurance

    International Nuclear Information System (INIS)

    Sastry, A.M.

    1989-01-01

    This paper describes the principles of system management and shows the relationship to quality assurance. It discusses the need for balanced attention to all the project management controls required for project success

  10. Informational system. Documents management

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2009-12-01

    Full Text Available Productivity growing, as well as reducing of operational costs in a company can be achieved by adopting a document management solutions. Such application will allow management and structured and efficient transmission of information within the organization.

  11. ASCOT data base management system

    Energy Technology Data Exchange (ETDEWEB)

    Barbieri, J.; Nyholm, R.; Castro, C.; Hill, K.

    1980-07-01

    The ASCOT data base management system is designed to handle the data produced by both the experimental and theoretical efforts of the DOE Atmospheric Studies in Complex Terrain (ASCOT) project. The data base envisioned is hierarchically structured, sparse, and compact. Information concerning any given data file is stored in a directory file. The data base management system uses a relational data management approach. Presently three management schema are being developed for use with the data base. 5 figures.

  12. New type radiation management system

    International Nuclear Information System (INIS)

    Mogi, Kenichi; Uranaka, Yasuo; Fujita, Kazuhiko

    2001-01-01

    The radiation management system is a system to carry out entrance and leaving room management of peoples into radiation management area, information management on radiation obtained from a radiation testing apparatus, and so on. New type radiation management system developed by the Mitsubishi Electric Corp. is designed by concepts of superior maintenance and system practice by using apparatus and its interface with standard specification, upgrading of processing response by separating exposure management processing from radiation monitoring processing on a computer, and a backup system not so as to lose its function by a single accident of the constructed computer. Therefore, the system is applied by the newest hardware, package software, and general use LAN, and can carry out a total system filled with requirements and functions for various radiation management of customers by preparing a basic system from radiation testing apparatus to entrance and leaving room management system. Here were described on outline of the new type management system, concept of the system, and functions of every testing apparatus. (G.K.)

  13. NASA Administrative Data Base Management Systems, 1984

    Science.gov (United States)

    Radosevich, J. D. (Editor)

    1984-01-01

    Strategies for converting to a data base management system (DBMS) and the implementation of the software packages necessary are discussed. Experiences with DBMS at various NASA centers are related including Langley's ADABAS/NATURAL and the NEMS subsystem of the NASA metrology informaton system. The value of the integrated workstation with a personal computer is explored.

  14. Nuclear spent fuel management. Experience and options

    International Nuclear Information System (INIS)

    1986-01-01

    Spent nuclear fuel can be stored safely for long periods at relatively low cost, but some form of permanent disposal will eventually be necessary. This report examines the options for spent fuel management, explores the future prospects for each stage of the back-end of the fuel cycle and provides a thorough review of past experience and the technical status of the alternatives. Current policies and practices in twelve OECD countries are surveyed

  15. DYMAC system: status and experience

    International Nuclear Information System (INIS)

    Malanify, J.J.

    1980-01-01

    The Dynamic Materials Accountability (DYMAC) system has been in operation at the Plutonium Processing Facility at the Los Alamos Scientific Laboratory since January 1978. The current status of this development and demonstration program, as well as the achieved operational experience, is reported

  16. Charting a Course through CORAL: Texas A&M University Libraries' Experience Implementing an Open-Source Electronic Resources Management System

    Science.gov (United States)

    Hartnett, Eric; Beh, Eugenia; Resnick, Taryn; Ugaz, Ana; Tabacaru, Simona

    2013-01-01

    In 2010, after two previous unsuccessful attempts at electronic resources management system (ERMS) implementation, Texas A&M University (TAMU) Libraries set out once again to find an ERMS that would fit its needs. After surveying the field, TAMU Libraries selected the University of Notre Dame Hesburgh Libraries-developed, open-source ERMS,…

  17. 4GL ward management system.

    OpenAIRE

    Brandejs, J. F.

    1991-01-01

    After many years of extensive research of computerized information systems for nursing, inpatient care, clinics and HMOs, laboratories, diagnostic imaging, pharmacy and other services, an integrated Ward Patient Management system was developed. A mature, relational data base management system (RDBMS) ORACLE was selected as the design tool. The system is running under VMS, DOS and UNIX operating systems and ORACLE version 6 on nearly all computer platforms, although multiprocessors are preferr...

  18. Lighting system with thermal management system

    Science.gov (United States)

    Arik, Mehmet; Weaver, Stanton; Stecher, Thomas; Seeley, Charles; Kuenzler, Glenn; Wolfe, Jr., Charles; Utturkar, Yogen; Sharma, Rajdeep; Prabhakaran, Satish; Icoz, Tunc

    2013-05-07

    Lighting systems having unique configurations are provided. For instance, the lighting system may include a light source, a thermal management system and driver electronics, each contained within a housing structure. The light source is configured to provide illumination visible through an opening in the housing structure. The thermal management system is configured to provide an air flow, such as a unidirectional air flow, through the housing structure in order to cool the light source. The driver electronics are configured to provide power to each of the light source and the thermal management system.

  19. Managing organizational culture within a management system

    International Nuclear Information System (INIS)

    Comeau, L.; Watts, G.

    2009-01-01

    The Point Lepreau Generating Station (PLGS) is currently undergoing a major refurbishment of its nuclear reactor. At the same time, a small team is designing the organization that will operate the plant after refurbishment. This paper offers a high level overview of the Post-Refurbishment Organization (PRO) project and will focus primarily on the approach used to address organizational culture and human system dynamics. We will describe how various tools, used to assess organization culture, team performance, and individual self-understanding, are used collectively to place the right person in the right position. We will explain how the career system, Pathfinder, is used to integrate these tools to support a comprehensive model for organization design and development. Finally, we demonstrate how the management of organizational cultural and human system dynamics are integrated into the PLGS Integrated Management System. (author)

  20. A conceptual framework for using DOE 5700.6C and the other DOE orders as an integrated management system; the Fermilab experience

    International Nuclear Information System (INIS)

    Bodnarczuk, M.

    1992-06-01

    In this paper, I describe a conceptual framework that uses DOE Order 5700.6C and more than 140 other DOE Orders as an integrated management system -- but I describe it within the context of the broader sociological and cultural issues of doing research at DOE funded facilities. The conceptual framework has two components. The first involves an interpretation of the 10 criteria of DOE 5700.6C that is tailored for a research environment. The second component involves using the 10 criteria as functional categories that orchestrate and integrate the other DOE Orders into a total management system. The Fermilab approach aims at reducing (or eliminating) the redundancy and overlap within the DOE Orders system at the contractor level

  1. A primer on potential impacts, management priorities, and future directions for Elodea spp. in high latitude systems: learning from the Alaskan experience

    Science.gov (United States)

    Carey, Michael P.; Sethi, Suresh A; Larsen, Sabrina J; Rich, Cecil F

    2016-01-01

    Invasive species introductions in Arctic and Subarctic ecosystems are growing as climate change manifests and human activity increases in high latitudes. The aquatic plants of the genus Elodea are potential invaders to Arctic and Subarctic ecosystems circumpolar and at least one species is already established in Alaska, USA. To illustrate the problems of preventing, eradicating, containing, and mitigating aquatic, invasive plants in Arctic and Subarctic ecosystems, we review the invasion dynamics of Elodea and provide recommendations for research and management efforts in Alaska. Foremost, we conclude the remoteness of Arctic and Subarctic systems such as Alaska is no longer a protective attribute against invasions, as transportation pathways now reach throughout these regions. Rather, high costs of operating in remote Arctic and Subarctic systems hinders detection of infestations and limits eradication or mitigation, emphasizing management priorities of prevention and containment of aquatic plant invaders in Alaska and other Arctic and Subarctic systems.

  2. A conceptual framework for using DOE 5700. 6C and the other DOE orders as an integrated management system; the Fermilab experience

    Energy Technology Data Exchange (ETDEWEB)

    Bodnarczuk, M.

    1992-06-01

    In this paper, I describe a conceptual framework that uses DOE Order 5700.6C and more than 140 other DOE Orders as an integrated management system -- but I describe it within the context of the broader sociological and cultural issues of doing research at DOE funded facilities. The conceptual framework has two components. The first involves an interpretation of the 10 criteria of DOE 5700.6C that is tailored for a research environment. The second component involves using the 10 criteria as functional categories that orchestrate and integrate the other DOE Orders into a total management system. The Fermilab approach aims at reducing (or eliminating) the redundancy and overlap within the DOE Orders system at the contractor level.

  3. A conceptual framework for using DOE 5700.6C and the other DOE orders as an integrated management system; the Fermilab experience

    Energy Technology Data Exchange (ETDEWEB)

    Bodnarczuk, M.

    1992-06-01

    In this paper, I describe a conceptual framework that uses DOE Order 5700.6C and more than 140 other DOE Orders as an integrated management system -- but I describe it within the context of the broader sociological and cultural issues of doing research at DOE funded facilities. The conceptual framework has two components. The first involves an interpretation of the 10 criteria of DOE 5700.6C that is tailored for a research environment. The second component involves using the 10 criteria as functional categories that orchestrate and integrate the other DOE Orders into a total management system. The Fermilab approach aims at reducing (or eliminating) the redundancy and overlap within the DOE Orders system at the contractor level.

  4. ENVIRONMENTAL SYSTEMS MANAGEMENT AND SUSTAINABLE SYSTEMS THEORY

    Science.gov (United States)

    Environmental Systems Management is the management of environmental problems at the systems level fully accounting for the multi-dimensional nature of the environment. This includes socio-economic dimensions as well as the usual physical and life science aspects. This is importa...

  5. The US JGOFS data management experience

    Science.gov (United States)

    Glover, David M.; Chandler, Cynthia L.; Doney, Scott C.; Buesseler, Ken O.; Heimerdinger, George; Bishop, J. K. B.; Flierl, Glenn R.

    2006-03-01

    The US Joint Global Ocean Flux Study (JGOFS) database management system is an online, oceanographic database assembled from the research activities of the US JGOFS field and Synthesis and Modeling Program (SMP). It is based on modern, object-oriented programming, with a web-based user interface ( http://usjgofs.whoi.edu/jg/dir/jgofs) that gives all users, regardless of the computer platform being used, equal access to the data and metadata. It is populated with an extensive set of biogeochemical data from the US JGOFS community along with the attendant metadata. This article summarizes the lessons learned that may serve as a primer for future oceanographic and earth science research programs. Good data management requires devoted resources, about 5-10% of the total cost of the program. A data management office should be established at the initiation of the program, conventions for standard methods, names, and units need to be established before the field program begins, and an agreed-to list of metadata must be collected systematically along with the data. Open and accessible data management depends upon investigators agreeing to share their data with each other, leading to more rapid scientific discovery. Data management should support data distribution and archival; interactions between the data managers and the principal investigators make the database a living database. Innovative use of commercial products in information technology can save time and money in scientific database management. Technology allows access to the database to be transparent in location and intuitive in use. Finally, the most important investments in data management are the people hired.

  6. Cargo Data Management Demonstration System

    Science.gov (United States)

    1974-02-01

    Delays in receipt and creation of cargo documents are a problem in international trade. The work described demonstrates some of the advantages and capabilities of a computer-based cargo data management system. A demonstration system for data manageme...

  7. Car insurance information management system

    OpenAIRE

    Sun, Yu

    2015-01-01

    A customer information system is a typical information management system. It involves three aspects, the backstage database establishment, the application development and the system maintenance. A car insurance information management system is based on browser/server structure. Microsoft SQL Server establishes the backstage database. Active Server Pages, from Microsoft as well is used as the interface layer. The objective of this thesis was to apply ASP to the dynamic storage of a web page...

  8. Dialogue Systems and Dialogue Management

    Science.gov (United States)

    2016-12-01

    system and user can take (McTear, 2002). FSM are archetypal handcrafted methods for dialogue management; they are developed solely through human...Natural language engineering, 6(3&4), pp. 323- 340. Lee, C., Jung , S., Eun, J., Jeong, M., & Lee, G. G. (2006). A situation-based dialogue management...72. IEEE. Lee, C., Jung , S., Kim, K., Lee, D., & Lee, G. G. (2010). Recent approaches to dialog management for spoken dialog systems. Journal of

  9. IT Asset Management System -

    Data.gov (United States)

    Department of Transportation — ITAMS provides a web frontend for the managing of all HW Assets lifecycle data purchased by ATO since 2006. In addition it contains much of our Enterprise SW license...

  10. Knowledge Management Experience in Kosovo Organizations

    Directory of Open Access Journals (Sweden)

    MSc. Drita Kacandolli-Gjonbalaj

    2014-06-01

    Full Text Available This paper is an empirical study, the findings of which reflect the experience gathered in knowledge management in Kosovo organizations. The main goal of this paper was to identify the realistic situation, and recommend instruments for a more effective knowledge management in Kosovo organizations. The findings of the empirical study have found inefficiency in knowledge management by organizations in Kosovo. A research was undertaken for this study, thereby directly interviewing representatives of 102 organizations in Kosovo.The research was undertaken during the period January-February 2013. Findings of the research show that most of the organizations in Kosovo are dominated by a random approach to knowledge assessment in personnel. This is the opinion of 83,3% of respondents in foreign organizations and institutions, 58,3% of respondents in education institutions, 53,8% of interviewees in state institutions, 47,4% of respondents in business organizations, and 34,8% of interviewees in the Privatization Agency of Kosovo (regional units and other operational units. The main statistical model used in this study was the ChiSquare, Asymp. Sig test (2 single-way and V. Cramer’s. Records were processed with the Statistical Package for Social Science (SPSS. The main recommendation of this paper is the following: essential changes are required in managers’ behaviour in terms of knowledge management, thereby fostering and motivating their subordinates to engage in change and new approaches in Kosovo organizations.

  11. Autonomously managed electrical power systems

    Science.gov (United States)

    Callis, Charles P.

    1986-01-01

    The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.

  12. Intelligent Integrated System Health Management

    Science.gov (United States)

    Figueroa, Fernando

    2012-01-01

    Intelligent Integrated System Health Management (ISHM) is the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system (Management: storage, distribution, sharing, maintenance, processing, reasoning, and presentation). Presentation discusses: (1) ISHM Capability Development. (1a) ISHM Knowledge Model. (1b) Standards for ISHM Implementation. (1c) ISHM Domain Models (ISHM-DM's). (1d) Intelligent Sensors and Components. (2) ISHM in Systems Design, Engineering, and Integration. (3) Intelligent Control for ISHM-Enabled Systems

  13. Medical-Information-Management System

    Science.gov (United States)

    Alterescu, Sidney; Friedman, Carl A.; Frankowski, James W.

    1989-01-01

    Medical Information Management System (MIMS) computer program interactive, general-purpose software system for storage and retrieval of information. Offers immediate assistance where manipulation of large data bases required. User quickly and efficiently extracts, displays, and analyzes data. Used in management of medical data and handling all aspects of data related to care of patients. Other applications include management of data on occupational safety in public and private sectors, handling judicial information, systemizing purchasing and procurement systems, and analyses of cost structures of organizations. Written in Microsoft FORTRAN 77.

  14. Customer experience management: New game strategy for competitiveness

    Directory of Open Access Journals (Sweden)

    Sivave Mashingaidze

    2014-08-01

    Full Text Available The main objective of this article was to do an extensive literature review of articles on customer experience management to explain the relationship between customer experience management and its factors which are supply chain management, location experience, packaging and labeling experience, atmosphere, service mix experience, promotion, customer experience, brand experience, and price experience for recommendation to the banking sector in Zimbabwe. Five modules of customer experience management which are sense, feel, think, act, and relate have also been reviewed and explored in the literature review. Findings showed that customer experience management factors contribute very much as a strategy to competitiveness in business. The article concluded by suggesting and recommending the adopting of customer experience management as a new game strategy.

  15. Management systems in production operations

    International Nuclear Information System (INIS)

    Walters, K.B.; Henderson, G.

    1993-01-01

    The Cullen Enquiry into the Piper Alpha disaster in the U.K. North Sea recommended that an operator should formally present it's company Management System and demonstrate how safety is achieved throughout the life cycle of a platform, from design through operation to abandonment. Brunei Shell Petroleum has prepared a corporate level Safety Management System. As part of Safety Case work, the corporate system is being extended to include the development of specific Management Systems with particular emphasis on offshore production operations involving integrated oil and gas facilities. This paper will describe the development of Management Systems, which includes an intensive Business Process Analysis and will comment upon it's applicability and relationship to ISO 9000. The paper will further describe the applicability and benefits of Management Systems and offer guidance on required effort. The paper will conclude that development of structured Management Systems for safety critical business processes is worthwhile but prioritization of effort will be necessary. As such the full adoption of Management Systems will be directional in nature

  16. Integrating the radioactive waste management system into other management systems

    International Nuclear Information System (INIS)

    Silva, Ana Cristina Lourenco da; Nunes Neto, Carlos Antonio

    2007-01-01

    Radioactive waste management is to be included in the Integrated Management System (IMS) which pursues the continuous improvement of the company's quality, occupational safety and health, and environment protection processes. Radioactive waste management is based on the following aspects: optimization of human and material resources for execution of tasks, including the provision of a radiation protection supervisor to watch over the management of radioactive waste; improved documentation (management plan and procedures); optimization of operational levels for waste classification and release; maintenance of generation records and history through a database that facilitates traceability of information; implementation of radioactive waste segregation at source (source identification, monitoring and decontamination) activities intended to reduce the amount of radioactive waste; licensing of initial storage site for radioactive waste control and storage; employee awareness training on radioactive waste generation; identification and evaluation of emergency situations and response planning; implementation of preventive maintenance program for safety related items; development and application of new, advanced treatment methodologies or systems. These aspects are inherent in the concepts underlying quality management (establishment of administrative controls and performance indicators), environment protection (establishment of operational levels and controls for release), occupational health and safety (establishment of operational controls for exposure in emergency and routine situations and compliance with strict legal requirements and standards). It is noted that optimizing the addressed aspects of a radioactive waste management system further enhances the efficiency of the Integrated Management System for Quality, Environment, and Occupational Safety and Health. (author)

  17. Development and implementation of integrated management system

    International Nuclear Information System (INIS)

    Tomov, E.; Nenkova, B.

    2013-01-01

    Risk Engineering Ltd is a private Bulgarian company in the field of scientific technical consultancy and engineering services, established in 1990. The aim of this report is to present the experience of Risk Engineering Ltd. in the development, implementation and operation of an integrated management system. The process of implementation of the system was completed at the end of 2011. In January 2012, the Risk Engineering Integrated Management System was certified by Lloyd's Register for compliance with standards ISO 9001:2008, ISO 140001:2004 and BS OHSAS 18001:2007

  18. Management Mangrove Experiences Form Coastal People

    Science.gov (United States)

    Indah, P. N.; Radianto, I.; Abidin, Z.; Amir, I. T.; Pribadi, D. U.

    2018-01-01

    The mangrove area has an important meaning in beach ecosystem, both from ecological and economical aspects. For this, the rehabilitation of mangrove forest is done as one effort that aims to maintain and return the mangrove forest function as one of life system supporters, especially in beach area. The most respondent ages of coast people of Gending, Pajarakan, dan Kraksaan districts, Probolinggo Regency are between 30 to 59 years old, i.e. as 86 people or 95.55% indicates that coast people are productive ages so they can be hoped very potential for having role in supporting mangrove ecosystem management of Probolinggo Regency coast. The average respondent educational rates are mostly Elementary School to Senior High School, i.e. as 76 people. Generally, human resources of coast people have relatively good education level. Thereby, it can be hoped to have positive potencies for the role of coast people themselves toward the mangrove ecosystem management support of Probolinggo Regency coast. The average most respondents have family burdens two and three people as six people or 6.67 percent. But, there are still three respondents who have not have family burdens. Generally, more and more members help in respondent’s jobs. The mangrove ecosystem management strategy of Probolinggo Regency coast is by involving people role (people and people figures) and governmental supports through the models of mangrove forest management strategy, the model of embankment cultivation management by entering mangrove as input resources of production facilities, and ecotourism management by the purpose of improving people income.

  19. Adaptable data management for systems biology investigations

    Directory of Open Access Journals (Sweden)

    Burdick David

    2009-03-01

    Full Text Available Abstract Background Within research each experiment is different, the focus changes and the data is generated from a continually evolving barrage of technologies. There is a continual introduction of new techniques whose usage ranges from in-house protocols through to high-throughput instrumentation. To support these requirements data management systems are needed that can be rapidly built and readily adapted for new usage. Results The adaptable data management system discussed is designed to support the seamless mining and analysis of biological experiment data that is commonly used in systems biology (e.g. ChIP-chip, gene expression, proteomics, imaging, flow cytometry. We use different content graphs to represent different views upon the data. These views are designed for different roles: equipment specific views are used to gather instrumentation information; data processing oriented views are provided to enable the rapid development of analysis applications; and research project specific views are used to organize information for individual research experiments. This management system allows for both the rapid introduction of new types of information and the evolution of the knowledge it represents. Conclusion Data management is an important aspect of any research enterprise. It is the foundation on which most applications are built, and must be easily extended to serve new functionality for new scientific areas. We have found that adopting a three-tier architecture for data management, built around distributed standardized content repositories, allows us to rapidly develop new applications to support a diverse user community.

  20. Adaptable data management for systems biology investigations

    Science.gov (United States)

    Boyle, John; Rovira, Hector; Cavnor, Chris; Burdick, David; Killcoyne, Sarah; Shmulevich, Ilya

    2009-01-01

    Background Within research each experiment is different, the focus changes and the data is generated from a continually evolving barrage of technologies. There is a continual introduction of new techniques whose usage ranges from in-house protocols through to high-throughput instrumentation. To support these requirements data management systems are needed that can be rapidly built and readily adapted for new usage. Results The adaptable data management system discussed is designed to support the seamless mining and analysis of biological experiment data that is commonly used in systems biology (e.g. ChIP-chip, gene expression, proteomics, imaging, flow cytometry). We use different content graphs to represent different views upon the data. These views are designed for different roles: equipment specific views are used to gather instrumentation information; data processing oriented views are provided to enable the rapid development of analysis applications; and research project specific views are used to organize information for individual research experiments. This management system allows for both the rapid introduction of new types of information and the evolution of the knowledge it represents. Conclusion Data management is an important aspect of any research enterprise. It is the foundation on which most applications are built, and must be easily extended to serve new functionality for new scientific areas. We have found that adopting a three-tier architecture for data management, built around distributed standardized content repositories, allows us to rapidly develop new applications to support a diverse user community. PMID:19265554

  1. Exploring how different modes of governance act across health system levels to influence primary healthcare facility managers' use of information in decision-making: experience from Cape Town, South Africa.

    Science.gov (United States)

    Scott, Vera; Gilson, Lucy

    2017-09-15

    Governance, which includes decision-making at all levels of the health system, and information have been identified as key, interacting levers of health system strengthening. However there is an extensive literature detailing the challenges of supporting health managers to use formal information from health information systems (HISs) in their decision-making. While health information needs differ across levels of the health system there has been surprisingly little empirical work considering what information is actually used by primary healthcare facility managers in managing, and making decisions about, service delivery. This paper, therefore, specifically examines experience from Cape Town, South Africa, asking the question: How is primary healthcare facility managers' use of information for decision-making influenced by governance across levels of the health system? The research is novel in that it both explores what information these facility managers actually use in decision-making, and considers how wider governance processes influence this information use. An academic researcher and four facility managers worked as co-researchers in a multi-case study in which three areas of management were served as the cases. There were iterative cycles of data collection and collaborative analysis with individual and peer reflective learning over a period of three years. Central governance shaped what information and knowledge was valued - and, therefore, generated and used at lower system levels. The central level valued formal health information generated in the district-based HIS which therefore attracted management attention across the levels of the health system in terms of design, funding and implementation. This information was useful in the top-down practices of planning and management of the public health system. However, in facilities at the frontline of service delivery, there was a strong requirement for local, disaggregated information and experiential

  2. An operational perspective of challenging statistical dogma while establishing a modern, secure distributed data management and imaging transport system: the Pediatric Brain Tumor Consortium phase I experience.

    Science.gov (United States)

    Onar, Arzu; Ramamurthy, Uma; Wallace, Dana; Boyett, James M

    2009-04-01

    The Pediatric Brain Tumor Consortium (PBTC) is a multidisciplinary cooperative research organization devoted to the study of correlative tumor biology and new therapies for primary central nervous system (CNS) tumors of childhood. The PBTC was created in 1999 to conduct early-phase studies in a rapid fashion in order to provide sound scientific foundation for the Children's Oncology Group to conduct definitive trials. The Operations and Biostatistics Center (OBC) of the PBTC is responsible for centrally administering study design and trial development, study conduct and monitoring, data collection and management as well as various regulatory and compliance processes. The phase I designs utilized for the consortium trials have accommodated challenges unique to pediatric trials such as body surface area (BSA)-based dosing in the absence of pediatric formulations of oral agents. Further during the past decade, the OBC has developed and implemented a state-of-the-art secure and efficient internet-based paperless distributed data management system. Additional web-based systems are also in place for tracking and distributing correlative study data as well as neuroimaging files. These systems enable effective communications among the members of the consortium and facilitate the conduct and timely reporting of multi-institutional early-phase clinical trials.

  3. NASA integrated vehicle health management technology experiment for X-37

    Science.gov (United States)

    Schwabacher, Mark; Samuels, Jeff; Brownston, Lee

    2002-07-01

    The NASA Integrated Vehicle Health Management (IVHM) Technology Experiment for X-37 was intended to run IVHM software on board the X-37 spacecraft. The X-37 is an unpiloted vehicle designed to orbit the Earth for up to 21 days before landing on a runway. The objectives of the experiment were to demonstrate the benefits of in-flight IVHM to the operation of a Reusable Launch Vehicle, to advance the Technology Readiness Level of this IVHM technology within a flight environment, and to demonstrate that the IVHM software could operate on the Vehicle Management Computer. The scope of the experiment was to perform real-time fault detection and isolation for X-37's electrical power system and electro-mechanical actuators. The experiment used Livingstone, a software system that performs diagnosis using a qualitative, model-based reasoning approach that searches system-wide interactions to detect and isolate failures. Two of the challenges we faced were to make this research software more efficient so that it would fit within the limited computational resources that were available to us on the X-37 spacecraft, and to modify it so that it satisfied the X-37's software safety requirements. Although the experiment is currently unfunded, the development effort resulted in major improvements in Livingstone's efficiency and safety. This paper reviews some of the details of the modeling and integration efforts, and some of the lessons that were learned.

  4. Management of diabetic foot disease and amputation in the Irish health system: a qualitative study of patients' attitudes and experiences with health services.

    LENUS (Irish Health Repository)

    Delea, Sarah

    2015-07-01

    Diabetes is an increasingly prevalent chronic illness that places a huge burden on the individual, the health system and society. Patients with active foot disease and lower limb amputations due to diabetes have a significant amount of interaction with the health care services. The purpose of this study was to explore the attitudes and experiences of foot care services in Ireland among people with diabetes and active foot disease or lower limb amputations.

  5. The CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Cinquilli, M. [CERN; Evans, D. [Fermilab; Foulkes, S. [Fermilab; Hufnagel, D. [Fermilab; Mascheroni, M. [CERN; Norman, M. [UC, San Diego; Maxa, Z. [Caltech; Melo, A. [Vanderbilt U.; Metson, S. [Bristol U.; Riahi, H. [INFN, Perugia; Ryu, S. [Fermilab; Spiga, D. [CERN; Vaandering, E. [Fermilab; Wakefield, Stuart [Imperial Coll., London; Wilkinson, R. [Caltech

    2012-01-01

    CMS has started the process of rolling out a new workload management system. This system is currently used for reprocessing and Monte Carlo production with tests under way using it for user analysis. It was decided to combine, as much as possible, the production/processing, analysis and T0 codebases so as to reduce duplicated functionality and make best use of limited developer and testing resources. This system now includes central request submission and management (Request Manager), a task queue for parcelling up and distributing work (WorkQueue) and agents which process requests by interfacing with disparate batch and storage resources (WMAgent).

  6. ISO 9001: Quality management systems. The experience of the centre for hydro graphic studies (CEDEX); ISO 9001: Sistemas de gestion de la calidad. La experiencia del Centro de Estudios Hidrograficos del CEDEX

    Energy Technology Data Exchange (ETDEWEB)

    Alonso Garcia, A. M.; Aviles Garcia, J.; Gonzalez Ramos, M. E.; Diago Sanchez, I.

    2010-07-01

    The Spanish government is developing several plans and programmes in order to introduce the quality culture and instruments in the various institutions, looking for efficient and committed public organizations, providers of quality services. To achieve the commitment to improve and modernize the Administration, the Centro de Estudios y Experimentacion de Obras Publicas (CEDEX) has decided the implementation and certification of a Quality Management System according to ISO 9001: standard at the Centro de Estudios Hidrograficos as pilot experience. (Author) 5 refs.

  7. Management systems for regulatory authorities

    International Nuclear Information System (INIS)

    Mpandanyama, Rujeko Lynette

    2015-02-01

    For a regulatory body to fulfil its statutory obligations, there is need to develop and implement a regulatory management system that has the necessary arrangements for achieving and maintaining high quality performance in regulating the safety of nuclear and radiation facilities under its authority. Hence, the regulatory management system needs to fully integrate the human resources, processes and physical resources of the organization. This study sought to provide an understanding of the concept, principles, policies and fundamentals of management systems as they relate to regulatory systems in the field of radiation protection and to make appropriate recommendations to ensure that an effective management system exists for the control of ionizing radiation and radiation sources and addresses all relevant stakeholders in Zimbabwe. A comparative analysis was done on the current management status and the ideal management system, which led to the identification of the gaps existing. The main key that was found to be of significance was lack of linkages between processes and management tools within the institution. (au)

  8. BIMS: Biomedical Information Management System

    OpenAIRE

    Mora, Oscar; Bisbal, Jesús

    2013-01-01

    In this paper, we present BIMS (Biomedical Information Management System). BIMS is a software architecture designed to provide a flexible computational framework to manage the information needs of a wide range of biomedical research projects. The main goal is to facilitate the clinicians' job in data entry, and researcher's tasks in data management, in high data quality biomedical research projects. The BIMS architecture has been designed following the two-level modeling paradigm, a promising...

  9. Quality management systems in radiology

    Directory of Open Access Journals (Sweden)

    Geoffrey K. Korir

    2013-08-01

    Objective: To assess the level of quality management systems in X-ray medical facilities in Kenya. Methods: Quality management inspection, quality control performance tests and patient radiation exposure were assessed in 54 representative X-ray medical facilities. Additionally, a survey of X-ray examination frequency was conducted in 140 hospitals across the country. Results: The overall findings placed the country’s X-ray imaging quality management systems at 61±3% out of a possible 100%. The most and the least quality assurance performance indicators were general radiography X-ray equipment quality control tests at 88±4%, and the interventional cardiology adult examinations below diagnostic reference level at 25±1%, respectively. Conclusions: The study used a systematic evidence-based approach for the assessment of national quality management systems in radiological practice in clinical application, technical conduct of the procedure, image quality criteria, and patient characteristics as part of the quality management programme.

  10. User Scientific Data Systems: Experience Report

    Science.gov (United States)

    Dobinson, Elain R.

    1992-01-01

    This paper presents an abbreviated history of NASA science data management system development over the past ten years by selecting two case studies, each representative of a distinct era of science data management systems.

  11. Project management web tools at the MICE experiment

    International Nuclear Information System (INIS)

    Coney, L R; Tunnell, C D

    2012-01-01

    Project management tools like Trac are commonly used within the open-source community to coordinate projects. The Muon Ionization Cooling Experiment (MICE) uses the project management web application Redmine to host mice.rl.ac.uk. Many groups within the experiment have a Redmine project: analysis, computing and software (including offline, online, controls and monitoring, and database subgroups), executive board, and operations. All of these groups use the website to communicate, track effort, develop schedules, and maintain documentation. The issue tracker is a rich tool that is used to identify tasks and monitor progress within groups on timescales ranging from immediate and unexpected problems to milestones that cover the life of the experiment. It allows the prioritization of tasks according to time-sensitivity, while providing a searchable record of work that has been done. This record of work can be used to measure both individual and overall group activity, identify areas lacking sufficient personnel or effort, and as a measure of progress against the schedule. Given that MICE, like many particle physics experiments, is an international community, such a system is required to allow easy communication within a global collaboration. Unlike systems that are purely wiki-based, the structure of a project management tool like Redmine allows information to be maintained in a more structured and logical fashion.

  12. Performance Management: The Neglected Imperative of Accountability Systems in Education

    Science.gov (United States)

    Mosoge, M. J.; Pilane, M. W.

    2014-01-01

    The first aim of this paper is to clarify the concept "performance management" as an aspect of the Integrated Quality Management System (IQMS). The second is to report on an exploration into the experiences and perceptions of management teams in the implementation of performance management. As part of the qualitative research design, the…

  13. [The Experience of Fluid Management in Hemodialysis Patients].

    Science.gov (United States)

    Kim, Yoonsoo; Kim, Miyoung

    2015-10-01

    The purpose of this study was to explore the experience of fluid management in hemodialysis patients by describing how they manage fluid intake and what affects fluid management. Purposive sampling yielded 11 patients who have received hemodialysis for one year or longer in one general hospital. Data were collected through in-depth interviews and analysed using Giorgi's phenomenological method. Data collection and analysis were performed concurrently. The findings regarding how hemodialysis patients manage fluid intake were classified into four constituents: 'recognizing the need for fluid control', 'observing the status of fluid accumulation', 'controlling fluid intake and output', 'getting used to fluid management'. The factors that affect fluid management of hemodialysis patients were revealed as 'willpower', 'change in the mindset', 'support system', and 'emotional state'. The study results show that hemodialysis patients manage fluid intake through food and exercise as well as interpersonal relationships. These findings suggest that strategies in the development of nursing interventions for hemodialysis patients should be directed at assisting them in familiarization with fluid management based on an understanding of their sociocultural contexts.

  14. MODERN PRINCIPLES OF PROTECTED AREAS MANAGEMENT: EUROPEAN EXPERIENCE

    Directory of Open Access Journals (Sweden)

    L. G. Demydenko

    2017-08-01

    Full Text Available The article outlines an understanding of the modern principles, types of management of protected areas and policies aimed at ensuring sustainable land use development taking into account European experience. The change in awareness of the role of nature in human life and place of man in the biological chain of the planet also changed the approaches to the creation of protected areas, measures of protection and management system and environmental and economic instruments of environmental land use. In Europe, there is an understanding that most of our biodiversity is found in semi-natural habitats that depend on long-term human management. This is reflected in the diversity of conservation policy types and strategies that have been developed in recent decades. Modern approaches recognize that well-managed nature conservation areas not only support important ecosystems and threatened species, but also provide many benefits to humans, including a range of ecosystem services. In practice, you can observe various types of management for protected areas. One of the forms of protected land use in Ukraine is the territory and objects of the nature reserve fund. Their successful use depends on a clear and coordinated management mechanism. Eurointegration processes in Ukraine (Association Agreement require and the application of new approaches in the management of protected areas and the application of new principles for their creation, the use of ecological and economic incentives for management.

  15. Spent fuel management systems, burnup credit approach experience in expert activity of State Scientific and Technical Centre for Nuclear and Radiation Safety

    International Nuclear Information System (INIS)

    Kovbasenko, Y.

    2010-01-01

    Implementing new devices and mechanisms, including those developed and manufactured abroad, at enterprises of the Ukrainian power industry makes it necessary to license them in advance by the Ukrainian Regulatory Authority. From time to time, situations occur when these systems or their close analogues have been already used in some countries and have successively passed licensing by the relevant Regulatory Authorities; however, they do not meet the regulatory requirements in force in Ukraine. Preliminary analysis of the regulations in Ukraine concerning nuclear safety of spent nuclear fuel (SNF) management systems shows that some regulatory requirements in force are too conservative in view of current international practice. The extent of conservatism can be reduced, if necessary, only on the base of improving our level of understanding the processes occurring in nuclear dangerous systems and improving our capabilities as regards accuracy, correctness, and reliability in numerical modeling these processes. Such activity is consistent with the state-of-the-art production requirements. This work was intended to demonstrate that the excessive conservatism laid previously into the requirements on nuclear safety in Ukraine due to insufficient development of tools for modeling processes in nuclear fuel can be considerably decreased through using more modern and real modeling fuel systems. If such modeling is performed with the use of state-of-the-art methods, based on more complete understanding the processes in fuel systems, then removal of the excessive conservatism will not reduce the safety of nuclear dangerous systems

  16. Customer experience management in digital channels with marketing automation

    OpenAIRE

    Mattila, J. (Juho)

    2016-01-01

    Abstract Superior customer experience and successful customer experience management can create a competitive advantage that is difficult to match by the competitors. However managing customer experience successfully the customer experience needs to be considered in the context of multiple marketing channels and multiple customer segments which requires a lot of resources. With the difficult financial conditions today the us...

  17. Congestion Management System Process Report

    Science.gov (United States)

    1996-03-01

    In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...

  18. System Wide Information Management (SWIM)

    Science.gov (United States)

    Hritz, Mike; McGowan, Shirley; Ramos, Cal

    2004-01-01

    This viewgraph presentation lists questions regarding the implementation of System Wide Information Management (SWIM). Some of the questions concern policy issues and strategies, technology issues and strategies, or transition issues and strategies.

  19. Fault management and systems knowledge

    Science.gov (United States)

    2016-12-01

    Pilots are asked to manage faults during flight operations. This leads to the training question of the type and depth of system knowledge required to respond to these faults. Based on discussions with multiple airline operators, there is agreement th...

  20. Technology adoption subsidies. An experiment with managers

    Energy Technology Data Exchange (ETDEWEB)

    Aalbers, Rob [Netherlands Bureau for Economic Policy Analysis, P.O. Box 80510, 2508 GM The Hague (Netherlands); Van der Heijden, Eline; Potters, Jan [CentER and Department of Economics, Tilburg University, P.O. Box 90153, 5000 LE Tilburg (Netherlands); Van Soest, Daan [Department of Spatial Economics/IVM, VU University, De Boelelaan 1105, 1081 HV Amsterdam (Netherlands); Vollebergh, Herman [Tinbergen Institute, Erasmus University Rotterdam and Netherlands Environmental Assessment Agency, P.O. Box 303, 3720 AH Bilthoven (Netherlands)

    2009-05-15

    We evaluate the impact of technology adoption subsidies on investment behavior in an individual choice experiment. In a laboratory setting professional managers are confronted with an intertemporal decision problem in which they have to decide whether or not to search for, and possibly adopt, a new technology. Technologies differ in the per-period benefits they yield, and their purchase price increases with the per-period benefits provided. We introduce a subsidy on the more expensive technologies (that also yield larger per-period benefits), and find that the subsidy scheme induces agents to search for and adopt these more expensive technologies even though the subsidy itself is too small to render these technologies profitable. We speculate that the result is driven by the positive connotation (affect) that the concept 'subsidy' invokes. (author)

  1. Technology adoption subsidies. An experiment with managers

    International Nuclear Information System (INIS)

    Aalbers, Rob; Van der Heijden, Eline; Potters, Jan; Van Soest, Daan; Vollebergh, Herman

    2009-01-01

    We evaluate the impact of technology adoption subsidies on investment behavior in an individual choice experiment. In a laboratory setting professional managers are confronted with an intertemporal decision problem in which they have to decide whether or not to search for, and possibly adopt, a new technology. Technologies differ in the per-period benefits they yield, and their purchase price increases with the per-period benefits provided. We introduce a subsidy on the more expensive technologies (that also yield larger per-period benefits), and find that the subsidy scheme induces agents to search for and adopt these more expensive technologies even though the subsidy itself is too small to render these technologies profitable. We speculate that the result is driven by the positive connotation (affect) that the concept 'subsidy' invokes. (author)

  2. RIMS: Resource Information Management System

    Science.gov (United States)

    Symes, J.

    1983-01-01

    An overview is given of the capabilities and functions of the resource management system (RIMS). It is a simple interactive DMS tool which allows users to build, modify, and maintain data management applications. The RIMS minimizes programmer support required to develop/maintain small data base applications. The RIMS also assists in bringing the United Information Services (UIS) budget system work inhouse. Information is also given on the relationship between the RIMS and the user community.

  3. BIMS: Biomedical Information Management System

    OpenAIRE

    Mora Pérez, Oscar

    2009-01-01

    This final year project presents the design principles and prototype implementation of BIMS (Biomedical Information Management System), a flexible software system which provides an infrastructure to manage all information required by biomedical research projects.The BIMS project was initiated with the motivation to solve several limitations in medical data acquisition of some research projects, in which Universitat Pompeu Fabra takes part. These limitations,based on the lack of control mechan...

  4. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...... is developed consisting of 18 dimensions. Building on an enterprise case we argue that the interrelation between politics, competences and unpredictability is crucial. A maturity measurement tool for enterprises planning to implement enterprise systems is developed....

  5. CLASSIFICATION OF LEARNING MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Yu. B. Popova

    2016-01-01

    Full Text Available Using of information technologies and, in particular, learning management systems, increases opportunities of teachers and students in reaching their goals in education. Such systems provide learning content, help organize and monitor training, collect progress statistics and take into account the individual characteristics of each user. Currently, there is a huge inventory of both paid and free systems are physically located both on college servers and in the cloud, offering different features sets of different licensing scheme and the cost. This creates the problem of choosing the best system. This problem is partly due to the lack of comprehensive classification of such systems. Analysis of more than 30 of the most common now automated learning management systems has shown that a classification of such systems should be carried out according to certain criteria, under which the same type of system can be considered. As classification features offered by the author are: cost, functionality, modularity, keeping the customer’s requirements, the integration of content, the physical location of a system, adaptability training. Considering the learning management system within these classifications and taking into account the current trends of their development, it is possible to identify the main requirements to them: functionality, reliability, ease of use, low cost, support for SCORM standard or Tin Can API, modularity and adaptability. According to the requirements at the Software Department of FITR BNTU under the guidance of the author since 2009 take place the development, the use and continuous improvement of their own learning management system.

  6. Impact Management System

    Data.gov (United States)

    US Agency for International Development — IMS (developed w/Iraq mission) is a system for conducting quality portfolio impact analysis, linking projects to strategy through integration of context data. IMS...

  7. Automated Maintenance Management System -

    Data.gov (United States)

    Department of Transportation — To achieve the to-be state of a modernized supply chain infrastructure and the NextGen Mission Service Requirements, the System Information Modernization initiative...

  8. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  9. Experiences in managing the Prometheus Project

    Science.gov (United States)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  10. Early Management Experience of Perforation after ERCP

    Directory of Open Access Journals (Sweden)

    Guohua Li

    2012-01-01

    Full Text Available Background and Aim. Perforation after endoscopic retrograde cholangiopancreatography (ERCP is a rare complication, but it is associated with significant mortality. This study evaluated the early management experience of these perforations. Patients and Methods. Between November 2003 and December 2011, a total of 8504 ERCPs were performed at our regional endoscopy center. Sixteen perforations (0.45% were identified and retrospectively reviewed. Results. Nine of these 16 patients with perforations were periampullary, 3 duodenal, 1 gastric fundus, and 3 patients had a perforation of an afferent limb of a Billroth II anastomosis. All patients with perforations were recognized during ERCP by X-ray and managed immediately. One patient with duodenal perforation and three patients with afferent limb perforation received surgery, others received medical conservative treatment which included suturing lesion, endoscopic nasobiliary drainage (ENBD, endoscopic retrograde pancreatic duct drainage (ERPD, gastrointestinal decompression, fasting, broad-spectrum antibiotics, and so on. All patients with perforation recovered successfully. Conclusions. We found that: (1 the diagnosis of perforation during ERCP may be easy, but you must pay attention to it. (2 Most retroperitoneal perforations can recover with only medical conservative treatment in early phase. (3 Most peritoneal perforations need surgery unless you can close the lesion up under endoscopy in early phase.

  11. Evaluating safety management system implementation

    International Nuclear Information System (INIS)

    Preuss, M.

    2009-01-01

    Canada is committed to not only maintaining, but also improving upon our record of having one of the safest aviation systems in the world. The development, implementation and maintenance of safety management systems is a significant step towards improving safety performance. Canada is considered a world leader in this area and we are fully engaged in implementation. By integrating risk management systems and business practices, the aviation industry stands to gain better safety performance with less regulatory intervention. These are important steps towards improving safety and enhancing the public's confidence in the safety of Canada's aviation system. (author)

  12. Interconnecting heterogeneous database management systems

    Science.gov (United States)

    Gligor, V. D.; Luckenbaugh, G. L.

    1984-01-01

    It is pointed out that there is still a great need for the development of improved communication between remote, heterogeneous database management systems (DBMS). Problems regarding the effective communication between distributed DBMSs are primarily related to significant differences between local data managers, local data models and representations, and local transaction managers. A system of interconnected DBMSs which exhibit such differences is called a network of distributed, heterogeneous DBMSs. In order to achieve effective interconnection of remote, heterogeneous DBMSs, the users must have uniform, integrated access to the different DBMs. The present investigation is mainly concerned with an analysis of the existing approaches to interconnecting heterogeneous DBMSs, taking into account four experimental DBMS projects.

  13. Emergency management information system (EMINS)

    International Nuclear Information System (INIS)

    Desonier, L.M.

    1987-01-01

    In a time of crisis or in an emergency, a manager is required to make many decisions to facilitate the proper solution and conclusion to the emergency or crisis. In order to make these decisions, it is necessary for the manager to have correct up-to-date information on the situation, which calls for an automated information display and entry process. The information handling needs are identified in terms of data, video, and voice. Studies of existing Emergency Operations Centers and evaluations of hardware and software have been completed. The result of these studies and investigations is the design and implementation of an automated Emergency Management Information System. Not only is the system useful for Emergency Management but for any information management requirement

  14. Ageing management experience at NUR Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Melllal, Sabrina; Rezig, Mohamed; Zamoun, Rachid; Ameur, Azeddin [Nuclear Research Center of Draria, Algiers (Algeria)

    2013-07-01

    NUR is a 1 MW, open pool reactor moderated and cooled by light water. It was commissioned in 1989. NUR is used for education and training in Nuclear Engineering and related topics for COMENA and National Scientific Community. It is also used to perform R and D works and services at national and regional levels. In this presentation, we describe the methodology and the main development activities related to the ageing management at NUR reactor. These activities include inspection actions and development actions to introduce modifications, to solve obsolescence issues in view to implement the required preventive and curative maintenance programs and to improve the performances of the installation. These actions involved mainly the Operation Assistance System of the Reactor (OAS), the secondary cooling loop, the cooling tower. A new OAS using a new technology and having more possibilities than the older one was introduced in the control system of the reactor. The OAS hardware structure, software structure and the main functions performed are presented. The second loop is entirely refurbished. Two new cooling towers are installed and connected to the main heat exchanger with new piping and valves. The architecture of this new installation is described and the performance assessed. Other actions which involve auxiliary systems like emergency electrical system, air pneumatic system and automatic fire extinguishing are presented.

  15. CMS data and workflow management system

    CERN Document Server

    Fanfani, A; Bacchi, W; Codispoti, G; De Filippis, N; Pompili, A; My, S; Abbrescia, M; Maggi, G; Donvito, G; Silvestris, L; Calzolari, F; Sarkar, S; Spiga, D; Cinquili, M; Lacaprara, S; Biasotto, M; Farina, F; Merlo, M; Belforte, S; Kavka, C; Sala, L; Harvey, J; Hufnagel, D; Fanzago, F; Corvo, M; Magini, N; Rehn, J; Toteva, Z; Feichtinger, D; Tuura, L; Eulisse, G; Bockelman, B; Lundstedt, C; Egeland, R; Evans, D; Mason, D; Gutsche, O; Sexton-Kennedy, L; Dagenhart, D W; Afaq, A; Guo, Y; Kosyakov, S; Lueking, L; Sekhri, V; Fisk, I; McBride, P; Bauerdick, L; Bakken, J; Rossman, P; Wicklund, E; Wu, Y; Jones, C; Kuznetsov, V; Riley, D; Dolgert, A; van Lingen, F; Narsky, I; Paus, C; Klute, M; Gomez-Ceballos, G; Piedra-Gomez, J; Miller, M; Mohapatra, A; Lazaridis, C; Bradley, D; Elmer, P; Wildish, T; Wuerthwein, F; Letts, J; Bourilkov, D; Kim, B; Smith, P; Hernandez, J M; Caballero, J; Delgado, A; Flix, J; Cabrillo-Bartolome, I; Kasemann, M; Flossdorf, A; Stadie, H; Kreuzer, P; Khomitch, A; Hof, C; Zeidler, C; Kalini, S; Trunov, A; Saout, C; Felzmann, U; Metson, S; Newbold, D; Geddes, N; Brew, C; Jackson, J; Wakefield, S; De Weirdt, S; Adler, V; Maes, J; Van Mulders, P; Villella, I; Hammad, G; Pukhaeva, N; Kurca, T; Semneniouk, I; Guan, W; Lajas, J A; Teodoro, D; Gregores, E; Baquero, M; Shehzad, A; Kadastik, M; Kodolova, O; Chao, Y; Ming Kuo, C; Filippidis, C; Walzel, G; Han, D; Kalinowski, A; Giro de Almeida, N M; Panyam, N

    2008-01-01

    CMS expects to manage many tens of peta bytes of data to be distributed over several computing centers around the world. The CMS distributed computing and analysis model is designed to serve, process and archive the large number of events that will be generated when the CMS detector starts taking data. The underlying concepts and the overall architecture of the CMS data and workflow management system will be presented. In addition the experience in using the system for MC production, initial detector commissioning activities and data analysis will be summarized.

  16. Computing experiments on stellar systems

    CERN Document Server

    Bouvier, P

    1972-01-01

    A stellar system being usually conceived, in a first approximation, as a group of point-like stars held together by their own gravitational mutual attraction, one may discriminate between three or four different lines of attack on the problem of the dynamical evolution of such a system. These are the straight-forward integration of the n- body problem, the statistical model description, the Monte Carlo technique, the Boltzmann moment approach. Direct numerical integration can now be applied to the dynamical evolution of star clusters containing up to 500 stars, which includes small to medium open stellar clusters, while statistical and Monte Carlo descriptions are better suited for systems of at least several thousand stars. The overall dynamic evolution of an isolated star cluster is characterized by the formation of a dense core surrounded by an extended halo, with some stars escaping with positive energy. This general feature has been confirmed in all the numerical experiments carried out in the last ten y...

  17. Experience of the Spanish radioactive management programme

    International Nuclear Information System (INIS)

    Beceiro, A.R.; Zuloaga, P.; Espejo, J.M.

    1997-01-01

    The important results achieved in the last 12 years , since the ENRESA inception, are reported. The establishment and start-up of the low and intermediate level waste management system (waste acceptance criteria and verification laboratories, waste collection and transport systems and conditioning facilities, temporary storage and disposal) is capable of managing wastes of these categories forecast to be produced in Spain up to the year 2013. The capacity to store temporarily the spent fuel on site at the operating NPPs is being increased to met practically the needs up to end of these plants' operating lifetime. This is being achieved through the re-racking of spent fuel pools and the use of metallic casks, depending on the technical possibilities of each plant. These increase in the capacity for spent fuel temporary storage will allow work on geological prospecting and technology development to progress over the next two decades, prior to construction of a geological disposal facility. All these tasks are being carried out in accordance with the established program initiated in 1987 which is requiring important technological financial and communication-related efforts. The financial, technological and waste management means required for dismantling of nuclear installations at the end of their operating lifetime have been established; thus, for instance, the works involved in dismantling and tailing dyke remodeling at the disused uranium mill in Andujar were completed. The engineering project for the dismantling of the Vandellos I NPP is going ahead according to schedule and was submitted to the Authorities during the first half of 1994, the starting of work being expected for the end of 1997. This overall set of results represents an appreciable improvement in Spain's capacity to solve environmental problems and a substantial reduction in the potential risk associated with the radioactive wastes accumulation. (authors)

  18. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  19. Management systems for service providers

    International Nuclear Information System (INIS)

    Bolokonya, Herbert Chiwalo

    2015-02-01

    In the field of radiation safety and protection there are a number of institutions that are involved in achieving different goals and strategies. These strategies and objectives are achieved based on a number of tools and systems, one of these tools and systems is the use of a management system. This study aimed at reviewing the management system concept for Technical Service Providers in the field of radiation safety and protection. The main focus was on personal monitoring services provided by personal dosimetry laboratories. A number of key issues were found to be prominent to make the management system efficient. These are laboratory accreditation, approval; having a customer driven operating criteria; and controlling of records and good reporting. (au)

  20. Implementation of integrated management system

    International Nuclear Information System (INIS)

    Gaspar Junior, Joao Carlos A.; Fonseca, Victor Zidan da

    2007-01-01

    In present day exist quality assurance system, environment, occupational health and safety such as ISO9001, ISO14001 and OHSAS18001 and others standards will can create. These standards can be implemented and certified they guarantee one record system, quality assurance, documents control, operational control, responsibility definition, training, preparing and serve to emergency, monitoring, internal audit, corrective action, continual improvement, prevent of pollution, write procedure, reduce costs, impact assessment, risk assessment , standard, decree, legal requirements of municipal, state, federal and local scope. These procedure and systems when isolate applied cause many management systems and bureaucracy. Integration Management System reduce to bureaucracy, excess of documents, documents storage and conflict documents and easy to others standards implementation in future. The Integrated Management System (IMS) will be implemented in 2007. INB created a management group for implementation, this group decides planing, works, policy and advertisement. Legal requirements were surveyed, internal audits, pre-audits and audits were realized. INB is partially in accordance with ISO14001, OSHAS18001 standards. But very soon, it will be totally in accordance with this norms. Many studies and works were contracted to deal with legal requirements. This work have intention of show implementation process of ISO14001, OHSAS18001 and Integrated Management System on INB. (author)

  1. The JCMT Telescope Management System

    Science.gov (United States)

    Tilanus, Remo P. J.; Jenness, Tim; Economou, Frossie; Cockayne, Steve

    Established telescopes often face a challenge when trying to incorporate new software standards and utilities into their existing real-time control system. At the JCMT we have successfully added important new features such as a Relational Database (the Telescope Management System---TMS), an online data Archive, and WWW based utilities to an, in part, 10-year old system. The new functionality was added with remarkably few alterations to the existing system. We are still actively expanding and exploring these new capabilities.

  2. Management Information System & Computer Applications

    OpenAIRE

    Sreeramana Aithal

    2017-01-01

    The book contains following Chapters : Chapter 1 : Introduction to Management Information Systems, Chapter 2 : Structure of MIS, Chapter 3 : Planning for MIS, Chapter 4 : Introduction to Computers Chapter 5 : Decision Making Process in MIS Chapter 6 : Approaches for System Development Chapter 7 : Form Design Chapter 8 : Charting Techniques Chapter 9 : System Analysis & Design Chapter 10 : Applications of MIS in Functional Areas Chapter 11 : System Implement...

  3. The decommissioning information management system

    International Nuclear Information System (INIS)

    Park, Seung-Kook; Moon, Jei-Kwon

    2015-01-01

    At the Korea Atomic Energy Research Institute (KAERI), the Korea Research Reactor (KRR-2) and one uranium conversion plant (UCP) were decommissioned. A project was launched in 1997, for the decommissioning of KRR-2 reactor with the goal of completion by 2008. Another project for the decommissioning of the UCP was launched in 2001. The physical dismantling works were started in August 2003 and the entire project was completed by the end of 2010. KAERI has developed a computer information system, named DECOMMIS, for an information management with an increased effectiveness for decommissioning projects and for record keeping for the future decommissioning projects. This decommissioning information system consists of three sub-systems; code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites to minimize the time gap between the dismantling activities and the evaluation of the data by the project staff. The DDPS provides useful information to the staff for more effective project management and this information includes several fields, such as project progress management, man power management, waste management, and radiation dose control of workers and so on. The DECOMMIS was applied to the decommissioning projects of the KRR-2 and the UCP, and was utilized to give information to the staff for making decisions regarding the progress of projects. It is also to prepare the reference data for the R and D program which is for the development of the decommissioning engineering system tools and to maintain the decommissioning data for the next projects. In this paper, the overall system will be explained and the several examples of its utilization, focused on waste management and manpower control, will be introduced. (author)

  4. Multiple system modelling of waste management

    International Nuclear Information System (INIS)

    Eriksson, Ola; Bisaillon, Mattias

    2011-01-01

    Highlights: → Linking of models will provide a more complete, correct and credible picture of the systems. → The linking procedure is easy to perform and also leads to activation of project partners. → The simulation procedure is a bit more complicated and calls for the ability to run both models. - Abstract: Due to increased environmental awareness, planning and performance of waste management has become more and more complex. Therefore waste management has early been subject to different types of modelling. Another field with long experience of modelling and systems perspective is energy systems. The two modelling traditions have developed side by side, but so far there are very few attempts to combine them. Waste management systems can be linked together with energy systems through incineration plants. The models for waste management can be modelled on a quite detailed level whereas surrounding systems are modelled in a more simplistic way. This is a problem, as previous studies have shown that assumptions on the surrounding system often tend to be important for the conclusions. In this paper it is shown how two models, one for the district heating system (MARTES) and another one for the waste management system (ORWARE), can be linked together. The strengths and weaknesses with model linking are discussed when compared to simplistic assumptions on effects in the energy and waste management systems. It is concluded that the linking of models will provide a more complete, correct and credible picture of the consequences of different simultaneous changes in the systems. The linking procedure is easy to perform and also leads to activation of project partners. However, the simulation procedure is a bit more complicated and calls for the ability to run both models.

  5. Integrated Systems Health Management for Intelligent Systems

    Science.gov (United States)

    Figueroa, Fernando; Melcher, Kevin

    2011-01-01

    The implementation of an integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive at an accurate and reliable assessment of its health. In this paper, concepts, procedures, and approaches are presented as a foundation for implementing an intelligent systems ]relevant ISHM capability. The capability stresses integration of DIaK from all elements of a system. Both ground-based (remote) and on-board ISHM capabilities are compared and contrasted. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems.

  6. DKIST facility management system integration

    Science.gov (United States)

    White, Charles R.; Phelps, LeEllen

    2016-07-01

    The Daniel K. Inouye Solar Telescope (DKIST) Observatory is under construction at Haleakalā, Maui, Hawai'i. When complete, the DKIST will be the largest solar telescope in the world. The Facility Management System (FMS) is a subsystem of the high-level Facility Control System (FCS) and directly controls the Facility Thermal System (FTS). The FMS receives operational mode information from the FCS while making process data available to the FCS and includes hardware and software to integrate and control all aspects of the FTS including the Carousel Cooling System, the Telescope Chamber Environmental Control Systems, and the Temperature Monitoring System. In addition it will integrate the Power Energy Management System and several service systems such as heating, ventilation, and air conditioning (HVAC), the Domestic Water Distribution System, and the Vacuum System. All of these subsystems must operate in coordination to provide the best possible observing conditions and overall building management. Further, the FMS must actively react to varying weather conditions and observational requirements. The physical impact of the facility must not interfere with neighboring installations while operating in a very environmentally and culturally sensitive area. The FMS system will be comprised of five Programmable Automation Controllers (PACs). We present a pre-build overview of the functional plan to integrate all of the FMS subsystems.

  7. Campus Telephone Systems: Managing Change.

    Science.gov (United States)

    National Association of College and University Business Officers, Washington, DC.

    Issues facing a college or university that seeks to change its telephone system are raised in seven chapters. Major topics addressed by this resource guide are: telephone deregulation and changes in the telephone industry, the new technology available, how to manage a system, consultants, financing options, and institutional case studies. Specific…

  8. Managing Risk in Systems Development.

    Science.gov (United States)

    DePaoli, Marilyn M.; And Others

    Stanford University's use of a risk assessment methodology to improve the management of systems development projects is discussed. After examining the concepts of hazard, peril, and risk as they relate to the system development process, three ways to assess risk are covered: size, structure, and technology. The overall objective for Stanford…

  9. Software Management in the LHCb Online System

    CERN Document Server

    Neufeld, N; Brarda, L; Closier, J; Moine, G; Degaudenzi, H

    2009-01-01

    LHCb has a large online IT infrastructure with thousands of servers and embedded systems, network routers and switches, databases and storage appliances. These systems run a large number of different applications on various operating systems. The dominant operating systems are Linux and MS-Windows. This large heterogeneous environment, operated by a small number of administrators, requires that new software or updates can be pushed quickly, reliably and as automated as possible. We present here the general design of LHCb's software management along with the main tools: LinuxFC / Quattor and Microsoft SMS, how they have been adapted and integrated and discuss experiences and problems.

  10. LHCb : Full Experiment System Test

    CERN Multimedia

    Cattaneo, M

    2009-01-01

    LHCb had been planning to commission its High Level Trigger software and Data Quality monitoring procedures using real collisions data from the LHC pilot run. Following the LHC incident on 19th September 2008, it was decided to commission the system using simulated data. This “Full Experiment System Test” consists of: - Injection of simulated minimum bias events into the full HLT farm, after selection by a simulated Level 0 trigger. - Processing in the HLT farm to achieve the output rate expected for nominal LHC luminosity running, sustained over the typical duration of an LHC fill. - Real time Data Quality validation of the HLT output, validation of calibration and alignment parameters for use in the reconstruction. - Transmission of the event data, calibration data and book-keeping information to Tier1 sites and full reconstruction of the event data. - Data Quality validation of the reconstruction output. We will report on the preparations and results of FEST09, and on the status of commissioning for no...

  11. The CMS Data Management System

    CERN Document Server

    Giffels, M.; Kuznetsov, V; Magini, N; Wildish, T

    2014-01-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Dataset Booking System (DBS), a metadata catalogue; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this presentation we will discuss the use of both Oracle and nonSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  12. Preferred providers and the credible commitment problem in health insurance: first experiences with the implementation of managed competition in the Dutch health care system.

    Science.gov (United States)

    Boonen, Lieke H H M; Schut, Frederik T

    2011-04-01

    We investigate the impact of the transition towards managed competition in the Dutch health care system on health insurers' contracting behaviour. Specifically, we examine whether insurers have been able to take up their role as prudent buyers of care and examine consumers' attitudes towards insurers' new role. Health insurers' contracting behaviour is investigated by an extensive analysis of available information on purchasing practices by health insurers and by interviews with directors of health care purchasing of the four major health insurers, accounting for 90% of the market. Consumer attitudes towards insurers' new role are investigated by surveys among a representative sample of enrollees over the period 2005-2009. During the first four years of the reform, health insurers were very reluctant to engage in selective contracting and preferred to use 'soft' positive incentives to encourage preferred provider choice rather than engaging in restrictive managed care activities. Consumer attitudes towards channelling vary considerably by type of provider but generally became more negative in the first two years after the reform. Insurers' reluctance to use selective contracting can be at least partly explained by the presence of a credible-commitment problem. Consumers do not trust that insurers with restrictive networks are committed to provide good quality care. The credible-commitment problem seems to be particularly relevant to the Netherlands, since Dutch enrollees are not used to restrictions on provider choice. Since consumers are quite sensitive to differences in provider quality, more reliable information about provider quality is required to reduce the credible-commitment problem.

  13. The ATLAS Distributed Data Management System & Databases

    CERN Document Server

    Garonne, V; The ATLAS collaboration; Barisits, M; Beermann, T; Vigne, R; Serfon, C

    2013-01-01

    The ATLAS Distributed Data Management (DDM) System is responsible for the global management of petabytes of high energy physics data. The current system, DQ2, has a critical dependency on Relational Database Management Systems (RDBMS), like Oracle. RDBMS are well-suited to enforcing data integrity in online transaction processing applications, however, concerns have been raised about the scalability of its data warehouse-like workload. In particular, analysis of archived data or aggregation of transactional data for summary purposes is problematic. Therefore, we have evaluated new approaches to handle vast amounts of data. We have investigated a class of database technologies commonly referred to as NoSQL databases. This includes distributed filesystems, like HDFS, that support parallel execution of computational tasks on distributed data, as well as schema-less approaches via key-value stores, like HBase. In this talk we will describe our use cases in ATLAS, share our experiences with various databases used ...

  14. Safety standards of IAEA for management systems

    International Nuclear Information System (INIS)

    Vincze, P.

    2005-01-01

    IAEA has developed a new series of safety standards which are assigned for constitution of the conditions and which give the instruction for setting up the management systems that integrate the aims of safety, health, life environment and quality. The new standard shall replace IAEA 50-C-Q - Requirements for security of the quality for safety in nuclear power plants and other nuclear facilities as well as 14 related safety instructions mentioned in the Safety series No. 50-C/SG-Q (1996). When developing of this complex, integrated set of requirements for management systems, the IAEA requirements 50-C-Q (1996) were taken into consideration as well as the publications developed within the International organisation for standardization (ISO) ISO 9001:2000 and ISO14001: 1996. The experience of European Union member states during the development, implementation and improvement of the management systems were also taken into consideration

  15. Multilevel Workflow System in the ATLAS Experiment

    International Nuclear Information System (INIS)

    Borodin, M; De, K; Navarro, J Garcia; Golubkov, D; Klimentov, A; Maeno, T; Vaniachine, A

    2015-01-01

    The ATLAS experiment is scaling up Big Data processing for the next LHC run using a multilevel workflow system comprised of many layers. In Big Data processing ATLAS deals with datasets, not individual files. Similarly a task (comprised of many jobs) has become a unit of the ATLAS workflow in distributed computing, with about 0.8M tasks processed per year. In order to manage the diversity of LHC physics (exceeding 35K physics samples per year), the individual data processing tasks are organized into workflows. For example, the Monte Carlo workflow is composed of many steps: generate or configure hard-processes, hadronize signal and minimum-bias (pileup) events, simulate energy deposition in the ATLAS detector, digitize electronics response, simulate triggers, reconstruct data, convert the reconstructed data into ROOT ntuples for physics analysis, etc. Outputs are merged and/or filtered as necessary to optimize the chain. The bi-level workflow manager - ProdSys2 - generates actual workflow tasks and their jobs are executed across more than a hundred distributed computing sites by PanDA - the ATLAS job-level workload management system. On the outer level, the Database Engine for Tasks (DEfT) empowers production managers with templated workflow definitions. On the next level, the Job Execution and Definition Interface (JEDI) is integrated with PanDA to provide dynamic job definition tailored to the sites capabilities. We report on scaling up the production system to accommodate a growing number of requirements from main ATLAS areas: Trigger, Physics and Data Preparation. (paper)

  16. Electromagnetic spectrum management system

    Science.gov (United States)

    Seastrand, Douglas R.

    2017-01-31

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  17. Electromagnetic spectrum management system

    Energy Technology Data Exchange (ETDEWEB)

    Seastrand, Douglas R.

    2017-10-17

    A system for transmitting a wireless countermeasure signal to disrupt third party communications is disclosed that include an antenna configured to receive wireless signals and transmit wireless counter measure signals such that the wireless countermeasure signals are responsive to the received wireless signals. A receiver processes the received wireless signals to create processed received signal data while a spectrum control module subtracts known source signal data from the processed received signal data to generate unknown source signal data. The unknown source signal data is based on unknown wireless signals, such as enemy signals. A transmitter is configured to process the unknown source signal data to create countermeasure signals and transmit a wireless countermeasure signal over the first antenna or a second antenna to thereby interfere with the unknown wireless signals.

  18. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  19. Autonomously managed high power systems

    International Nuclear Information System (INIS)

    Weeks, D.J.; Bechtel, R.T.

    1985-01-01

    The need for autonomous power management capabilities will increase as the power levels of spacecraft increase into the multi-100 kW range. The quantity of labor intensive ground and crew support consumed by the 9 kW Skylab cannot be afforded in support of a 75-300 kW Space Station or high power earth orbital and interplanetary spacecraft. Marshall Space Flight Center is managing a program to develop necessary technologies for high power system autonomous management. To date a reference electrical power system and automation approaches have been defined. A test facility for evaluation and verification of management algorithms and hardware has been designed with the first of the three power channel capability nearing completion

  20. Introduction to Management Information system

    OpenAIRE

    Mishra, Umakant

    2013-01-01

    A Management Information System (MIS) is a systematic organization and presentation of information that is generally required by the management of an organization for taking better decisions for the organization. The MIS data may be derived from various units of the organization or from other sources. However it is very difficult to say the exact structure of MIS as the structure and goals of different types of organizations are different. Hence both the data and structure of MIS is dependent...

  1. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. [Tennessee Univ., Knoxville, TN (United States)

    1992-08-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  2. Laboratory information management system proposal

    Energy Technology Data Exchange (ETDEWEB)

    Brown, B.; Schweitzer, S.; Adams, C.; White, S. (Tennessee Univ., Knoxville, TN (United States))

    1992-01-01

    The objectives of this paper is design a user friendly information management system using a relational database in order to: allow customers direct access to the system; provide customers with direct sample tracking capabilities; provide customers with more timely, consistent reporting; better allocate costs for analyses to appropriate customers; eliminate cumbersome and costly papertrails; and enhance facility utilization by laboratory personnel. The resultant savings through increased efficiency provided by this system should more than offset its cost in the long-term.

  3. The innovation and practice of management improved by integration management information system in nuclear enterprise

    International Nuclear Information System (INIS)

    Zhang Fan; Cheng Lihong; Li Qisheng; Ge Zhengfa

    2012-01-01

    This article expounds that Hunan Taohuajiang Nuclear Power Company generally programs the route of company's core business and implements its integration through referencing the experience of informationization construction of other enterprises at the beginning of the foundation of this company, and summarizes the experience of system construction and analyses the innovation and signification of the integrative management information system to the nu- clear power enterprise management from data unified, resources sharing and business electronic and the management improvement of this company. (authors)

  4. Management of Open Abdomen: Single Center Experience

    Directory of Open Access Journals (Sweden)

    Hakan Yanar

    2013-01-01

    Full Text Available Aim. The authors reviewed their experience in the management of open abdomen using the vacuum-assisted closure (VAC, in order to assess its morbidity, and the outcome of abdominal wall integrity. Methods. A retrospective review was performed using the trauma registry to identify patients undergoing temporary abdominal closure (TAC either using Bogota Bag (BB or VAC, from January 2006 to December 2012. Inclusion criteria were TAC and survival to definitive abdominal closure. Data collected included age, indication for TAC, number of operating room procedures, primary fascial closure rate, and complications. Results. During the study period, 156 patients required one type of TAC. Mean number of operations required in BB group was 3.04 as compared to 1.96 in VAC group (. Survival was significantly increased in the VAC group (. The difference in primary closure rates did not reach statistical significance (25% vs. 55%; . Complications were observed less frequently in the VAC group (. The mean time for fascial closure was 21 (±12 days in the BB group, as opposed to 6 (±3 days in the VAC group (. Conclusion. The vacuum assisted closure (VAC has a significantly faster rate of closure, requires less number of operations, and is associated with a lower complication rate.

  5. Surgical management of gynecomastia: 20 years' experience.

    Science.gov (United States)

    Lapid, O; Jolink, F

    2014-03-01

    Gynecomastia, breast hypertrophy in men, is a common finding. The diagnosis is clinical, and ancillary tests may be performed; however, there is no unanimity in the literature about their use or utility. The mainstay of management is conservative, with a minority of patients being operated on. The surgical treatment of gynecomastia is not restricted to one discipline and is performed by plastic, general, and pediatric surgeons. The aim of this study was to assess the experience treating gynecomastia in a university hospital and the practices of the different surgical disciplines in the diagnosis and surgical treatment of gynecomastia; this knowledge could be used for the formulation of guidelines and the allocation of health-care resources. a university medical center. A retrospective cohort study in which all records of patients operated on for gynecomastia over a 20-year period were retrieved. Data were obtained concerning patient demographics, responsible surgical discipline, the workup and etiology found, the surgical technique used, the occurrence of reoperations and revisions, and the use of pathological examination and its results. A total of 179 patients were treated. There was a difference between the patient groups operated on by the different disciplines regarding the indication, the workup, as well as in the operative techniques used. Plastic surgeons performed more bilateral operations than the other disciplines. Surgeons used more radiology and cytology testing. These results most probably represent differences in the population and pathologies treated. This is possibly due to a bias in the referrals by primary care physicians.

  6. Intentional systems management: managing forests for biodiversity.

    Science.gov (United States)

    A.B. Carey; B.R. Lippke; J. Sessions

    1999-01-01

    Conservation of biodiversity provides for economic, social, and environmental sustainability. Intentional management is designed to manage conflicts among groups with conflicting interests. Our goal was to ascertain if intentional management and principles of conservation of biodiversity could be combined into upland and riparian forest management strategies that would...

  7. Customer experience in marketing: History, concept and management

    Directory of Open Access Journals (Sweden)

    Štavljanin Velimir

    2017-01-01

    Full Text Available Companies are nowadays faced with challenges regarding interaction with customers through various touchpoints in multichannel environment. Key priority in that situation is to manage all those touchpoints in such a way to optimize customer experience. In a context like this customer experience management is becoming a priority for a large number of companies. The aim of this paper is to clarify the concept of customer experience, bring it closer to the academic and practitioner community, and create interest for this relatively novel concept. Paper provides historical review of the literature in the domain of consumer experience, detailed analysis of customer experience concept, and present models of customer experience management.

  8. Management of complex dynamical systems

    Science.gov (United States)

    MacKay, R. S.

    2018-02-01

    Complex dynamical systems are systems with many interdependent components which evolve in time. One might wish to control their trajectories, but a more practical alternative is to control just their statistical behaviour. In many contexts this would be both sufficient and a more realistic goal, e.g. climate and socio-economic systems. I refer to it as ‘management’ of complex dynamical systems. In this paper, some mathematics for management of complex dynamical systems is developed in the weakly dependent regime, and questions are posed for the strongly dependent regime.

  9. The CMS data management system

    International Nuclear Information System (INIS)

    Giffels, M; Magini, N; Guo, Y; Kuznetsov, V; Wildish, T

    2014-01-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  10. The CMS Data Management System

    Science.gov (United States)

    Giffels, M.; Guo, Y.; Kuznetsov, V.; Magini, N.; Wildish, T.

    2014-06-01

    The data management elements in CMS are scalable, modular, and designed to work together. The main components are PhEDEx, the data transfer and location system; the Data Booking Service (DBS), a metadata catalog; and the Data Aggregation Service (DAS), designed to aggregate views and provide them to users and services. Tens of thousands of samples have been cataloged and petabytes of data have been moved since the run began. The modular system has allowed the optimal use of appropriate underlying technologies. In this contribution we will discuss the use of both Oracle and NoSQL databases to implement the data management elements as well as the individual architectures chosen. We will discuss how the data management system functioned during the first run, and what improvements are planned in preparation for 2015.

  11. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Hansen, Michael Fiil

    2006-01-01

    The ERP journey has taken us beyond implementation, into the second wave of ERP. One interesting question in this second wave is how the ERP system is managed and what role the ERP system plays in the organization after some years of implementation. These questions are addressed in this paper....... In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  12. Archetypes for Managing ERP Systems

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Fill, Michael; Simonsen, Martin

    2007-01-01

    The ERP journey has taken us beyond implementation, into the second wave of ERP. One interesting question in this second wave is how the ERP system is managed and what role the ERP system plays in the organization after some years of implementation. These questions are addressed in this paper....... In our research of 20 case-studies we found certain similarities and differences in the patterns which coalesced around three alternatives in the way organizations approach the managing of ERP in the second wave. We describe these archetypes, which we call the Calculators, the Co-players and the Drivers......, and we present illustrative cases of each of the archetypes. The archetypes are believed to play an important role in conveying the essential differences existing in alternative ways in which organizations manage their ERP system during the second wave....

  13. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  14. Auditing of environmental management system

    Directory of Open Access Journals (Sweden)

    Čuchranová Katarína

    2001-12-01

    Full Text Available Environmental auditing has estabilished itself as a valueable instrument to verify and help to improve the environmental performance.Organizations of all kinds may have a need to demonstrate the environmental responsibility. The concept of environmental management systems and the associated practice of environmental auditing have been advanced as one way to satisfy this need.These system are intended to help an organization to establish and continue to meet its environmental policies, objectives, standards and other requirements.Environmental auditing is a systematic and documented verification process of objectively obtaining and evaluating audit evidence to determine whether an organizations environmental management system conforms to the environmental management system audit criteria set by the organization and for the communication of the results of this process to the management.The following article intercepts all parts of preparation environmental auditing.The audit programme and procedures should cover the activities and areas to be considered in audits, the frequency of audits, the responsibilities associated with managing and conducting audits, the communication of audit results, auditor competence, and how audits will be conducted.The International Standard ISO 140011 estabilishes the audit procedures that determine conformance with EMS audit criteria.

  15. CATHARE Assessment of PACTEL LOCA Experiments with Accident Management

    Directory of Open Access Journals (Sweden)

    Luben Sabotinov

    2010-01-01

    Full Text Available This paper summarizes the analysis results of three PACTEL experiments, carried out with the advanced thermal-hydraulic system computer CATHARE 2 code as a part of the second work package WP2 (analytical work of the EC project “Improved Accident Management of VVER nuclear power plants” (IMPAM-VVER. The three LOCA experiments, conducted on the Finnish test facility PACTEL (VVER-440 model, represent 7.4% cold leg breaks with combination of secondary bleed and primary bleed and feed and different actuation modes of the passive safety injection. The code was used for both defining and analyzing the experiments, and to assess its capabilities in predicting the associated complex VVER-related phenomena. The code results are in reasonable agreement with the measurements, and the important physical phenomena are well predicted, although still further improvement and validation might be necessary.

  16. The management system of cognitive economics

    Directory of Open Access Journals (Sweden)

    Nikulina Irina

    2016-01-01

    Full Text Available The article contains various definitions of cognitive economy. An economy based on knowledge, should be provided by a modernized management system, which allows solving the problems of modern organizations in their functioning and development. The modern control system can effectively influence the cognitive economy through the highlighted items at the levels of the organization, thereby forming a complex of facilities management. The knowledge economy relies on the laws of the globalization, different directions of development of science and practice of management, prediction of the future, as well as the changes taking place in today’s business environment. In such an environment of modern society business is seen as an experiment. Various theories and management concepts are developed and supplemented with the changes in the life of people, organizations, industries and countries. Knowledge management concepts and theories are needed for technology of managerial work. In the era of cognitive economy, a manager must have the ability to use existing knowledge of management innovations applied to a particular situation, as well as to select areas of knowledge application for the development of the organization.

  17. The SMAP Dictionary Management System

    Science.gov (United States)

    Smith, Kevin A.; Swan, Christoper A.

    2014-01-01

    The Soil Moisture Active Passive (SMAP) Dictionary Management System is a web-based tool to develop and store a mission dictionary. A mission dictionary defines the interface between a ground system and a spacecraft. In recent years, mission dictionaries have grown in size and scope, making it difficult for engineers across multiple disciplines to coordinate the dictionary development effort. The Dictionary Management Systemaddresses these issues by placing all dictionary information in one place, taking advantage of the efficiencies inherent in co-locating what were once disparate dictionary development efforts.

  18. Experience with FreeStyle Libre Flash glucose monitoring system in management of refractory dumping syndrome in pregnancy shortly after bariatric surgery

    Directory of Open Access Journals (Sweden)

    Peter Novodvorsky

    2017-12-01

    Full Text Available Bariatric surgery is an effective therapy for obesity but is associated with long-term complications such as dumping syndromes and nutritional deficiencies. We report a case of a 26-year-old caucasian female, with history of morbid obesity and gestational diabetes (GDM, who became pregnant 4 months after Roux-en-Y bypass surgery. She developed GDM during subsequent pregnancy, which was initially managed with metformin and insulin. Nocturnal hypoglycaemia causing sleep disturbance and daytime somnolence occured at 19 weeks of pregnancy (19/40. Treatment with rapid-acting carbohydrates precipitated further hypoglycaemia. Laboratory investigations confirmed hypoglycaemia at 2.2 mmol/L with appropriately low insulin and C-peptide, intact HPA axis and negative IgG insulin antibodies. The patient was seen regularly by the bariatric dietetic team but concerns about compliance persisted. A FreeStyle Libre system was used from 21/40 enabling the patient a real-time feedback of changes in interstitial glucose following high or low GI index food intake. The patient declined a trial of acarbose but consented to an intraveneous dextrose infusion overnight resulting in improvement but not complete abolishment of nocturnal hypoglycaemia. Hypoglycaemias subsided at 34/40 and metformin and insulin had to be re-introduced due to high post-prandial blood glucose readings. An emergency C-section was indicated at 35 + 1/40 and a small-for-gestational-age female was delivered. There have been no further episodes of hypoglycaemia following delivery. This case illustrates challenges in the management of pregnancy following bariatric surgery. To our knowledge, this is the first use of FreeStyle Libre in dumping syndrome in pregnancy following bariatric surgery with troublesome nocturnal hypoglycaemia.

  19. Display-management system for MFTF

    International Nuclear Information System (INIS)

    Nelson, D.O.

    1981-01-01

    The Mirror Fusion Test Facility (MFTF) is controlled by 65 local control microcomputers which are supervised by a local network of nine 32-bit minicomputers. Associated with seven of the nine computers are state-of-the-art graphics devices, each with extensive local processing capability. These devices provide the means for an operator to interact with the control software running on the minicomputers. It is critical that the information the operator views accurately reflects the current state of the experiment. This information is integrated into dynamically changing pictures called displays. The primary organizational component of the display system is the software-addressable segment. The segments created by the display creation software are managed by display managers associated with each graphics device. Each display manager uses sophisticated storage management mechanisms to keep the proper segments resident in the local graphics device storage

  20. Integrated therapy safety management system.

    Science.gov (United States)

    Podtschaske, Beatrice; Fuchs, Daniela; Friesdorf, Wolfgang

    2013-09-01

    The aim is to demonstrate the benefit of the medico-ergonomic approach for the redesign of clinical work systems. Based on the six layer model, a concept for an 'integrated therapy safety management' is drafted. This concept could serve as a basis to improve resilience. The concept is developed through a concept-based approach. The state of the art of safety and complexity research in human factors and ergonomics forms the basis. The findings are synthesized to a concept for 'integrated therapy safety management'. The concept is applied by way of example for the 'medication process' to demonstrate its practical implementation. The 'integrated therapy safety management' is drafted in accordance with the six layer model. This model supports a detailed description of specific work tasks, the corresponding responsibilities and related workflows at different layers by using the concept of 'bridge managers'. 'Bridge managers' anticipate potential errors and monitor the controlled system continuously. If disruptions or disturbances occur, they respond with corrective actions which ensure that no harm results and they initiate preventive measures for future procedures. The concept demonstrates that in a complex work system, the human factor is the key element and final authority to cope with the residual complexity. The expertise of the 'bridge managers' and the recursive hierarchical structure results in highly adaptive clinical work systems and increases their resilience. The medico-ergonomic approach is a highly promising way of coping with two complexities. It offers a systematic framework for comprehensive analyses of clinical work systems and promotes interdisciplinary collaboration. © 2013 The Authors. British Journal of Clinical Pharmacology © 2013 The British Pharmacological Society.

  1. The DIRAC Data Management System (poster)

    CERN Document Server

    Haen, Christophe

    2015-01-01

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks. In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. The DIRAC DMS is in use by several user communities now. The contribution will present the experience of the LHCb exper...

  2. Data Management System of the DIRAC Project

    CERN Multimedia

    Haen, Christophe; Tsaregorodtsev, Andrei

    2015-01-01

    The DIRAC Interware provides a development framework and a complete set of components for building distributed computing systems. The DIRAC Data Management System (DMS) offers all the necessary tools to ensure data handling operations for small and large user communities. It supports transparent access to storage resources based on multiple technologies, and is easily expandable. The information on data files and replicas is kept in a File Catalog of which DIRAC offers a powerful and versatile implementation (DFC). Data movement can be performed using third party services including FTS3. Bulk data operations are resilient with respect to failures due to the use of the Request Management System (RMS) that keeps track of ongoing tasks. In this contribution we will present an overview of the DIRAC DMS capabilities and its connection with other DIRAC subsystems such as the Transformation System. The DIRAC DMS is in use by several user communities now. The contribution will present the experience of the LHCb exper...

  3. Diabetes patients' experiences with the implementation of insulin therapy and their perceptions of computer-assisted self-management systems for insulin therapy.

    Science.gov (United States)

    Simon, Airin Cr; Gude, Wouter T; Holleman, Frits; Hoekstra, Joost Bl; Peek, Niels

    2014-10-23

    Computer-assisted decision support is an emerging modality to assist patients with type 2 diabetes mellitus (T2DM) in insulin self-titration (ie, self-adjusting insulin dose according to daily blood glucose levels). Computer-assisted insulin self-titration systems mainly focus on helping patients overcome barriers related to the cognitive components of insulin titration. Yet other (eg, psychological or physical) barriers could still impede effective use of such systems. Our primary aim was to identify experiences with and barriers to self-monitoring of blood glucose, insulin injection, and insulin titration among patients with T2DM. Our research team developed a computer-assisted insulin self-titration system, called PANDIT. The secondary aim of this study was to evaluate patients' perceptions of computer-assisted insulin self-titration. We included patients who used PANDIT in a 4-week pilot study as well as patients who had never used such a system. In-depth, semi-structured interviews were conducted individually with patients on insulin therapy who were randomly recruited from a university hospital and surrounding general practices in the Netherlands. The interviews were transcribed verbatim and analyzed qualitatively. To classify the textual remarks, we created a codebook during the analysis, in a bottom-up and iterative fashion. To support examination of the final coded data, we used three theories from the field of health psychology and the integrated model of user satisfaction and technology acceptance by Wixom and Todd. When starting insulin therapy, some patients feared a lifelong commitment to insulin therapy and disease progression. Also, many barriers arose when implementing insulin therapy (eg, some patients were embarrassed to inject insulin in public). Furthermore, patients had difficulties increasing the insulin dose because they fear hypoglycemia, they associate higher insulin doses with disease progression, and some were ignorant of treatment

  4. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  5. Patient experience shows little relationship with hospital quality management strategies.

    NARCIS (Netherlands)

    Groene, O.; Arah, O.A.; Klazinga, N.S.; Wagner, C.; Bartels, P.D.; Kristensen, S.; Saillour, F.; Thompson, C.A.; Pfaff, H.; DerSarkissian, M.; Suñol, R.

    2015-01-01

    Objectives: Patient-reported experience measures are increasingly being used to routinely monitor the quality of care. With the increasing attention on such measures, hospital managers seek ways to systematically improve patient experience across hospital departments, in particular where outcomes

  6. Knowledge management: processes and systems | Igbinovia ...

    African Journals Online (AJOL)

    Knowledge management: processes and systems. ... Information Impact: Journal of Information and Knowledge Management ... observation, role reversal technique, and discussion forums as well as the forms of knowledge representation to include report writing, database management system and institutional repositories.

  7. Experience with FreeStyle Libre Flash glucose monitoring system in management of refractory dumping syndrome in pregnancy shortly after bariatric surgery.

    Science.gov (United States)

    Novodvorsky, Peter; Walkinshaw, Emma; Rahman, Waliur; Gordon, Valerie; Towse, Karen; Mitchell, Sarah; Selvarajah, Dinesh; Madhuvrata, Priya; Munir, Alia

    2017-01-01

    Bariatric surgery is an effective therapy for obesity but is associated with long-term complications such as dumping syndromes and nutritional deficiencies. We report a case of a 26-year-old caucasian female, with history of morbid obesity and gestational diabetes (GDM), who became pregnant 4 months after Roux-en-Y bypass surgery. She developed GDM during subsequent pregnancy, which was initially managed with metformin and insulin. Nocturnal hypoglycaemia causing sleep disturbance and daytime somnolence occured at 19 weeks of pregnancy (19/40). Treatment with rapid-acting carbohydrates precipitated further hypoglycaemia. Laboratory investigations confirmed hypoglycaemia at 2.2 mmol/L with appropriately low insulin and C-peptide, intact HPA axis and negative IgG insulin antibodies. The patient was seen regularly by the bariatric dietetic team but concerns about compliance persisted. A FreeStyle Libre system was used from 21/40 enabling the patient a real-time feedback of changes in interstitial glucose following high or low GI index food intake. The patient declined a trial of acarbose but consented to an intraveneous dextrose infusion overnight resulting in improvement but not complete abolishment of nocturnal hypoglycaemia. Hypoglycaemias subsided at 34/40 and metformin and insulin had to be re-introduced due to high post-prandial blood glucose readings. An emergency C-section was indicated at 35 + 1/40 and a small-for-gestational-age female was delivered. There have been no further episodes of hypoglycaemia following delivery. This case illustrates challenges in the management of pregnancy following bariatric surgery. To our knowledge, this is the first use of FreeStyle Libre in dumping syndrome in pregnancy following bariatric surgery with troublesome nocturnal hypoglycaemia. Bariatric surgery represents the most effective treatment modality in cases of severe obesity. With increasing prevalence of obesity, more people are likely to undergo bariatric

  8. Thermal management systems and methods

    Science.gov (United States)

    Gering, Kevin L.; Haefner, Daryl R.

    2006-12-12

    A thermal management system for a vehicle includes a heat exchanger having a thermal energy storage material provided therein, a first coolant loop thermally coupled to an electrochemical storage device located within the first coolant loop and to the heat exchanger, and a second coolant loop thermally coupled to the heat exchanger. The first and second coolant loops are configured to carry distinct thermal energy transfer media. The thermal management system also includes an interface configured to facilitate transfer of heat generated by an internal combustion engine to the heat exchanger via the second coolant loop in order to selectively deliver the heat to the electrochemical storage device. Thermal management methods are also provided.

  9. An Integrated Knowledge Management System

    Directory of Open Access Journals (Sweden)

    Vasile Mazilescu

    2014-11-01

    Full Text Available The aim of this paper is to present a Knowledge Management System based on Fuzzy Logic (FLKMS, a real-time expert system to meet the challenges of the dynamic environment. The main feature of our integrated shell FLKMS is that it models and integrates the temporal relationships between the dynamic of the evolution of an economic process with some fuzzy inferential methods, using a knowledge model for control, embedded within the expert system’s operational knowledge base.

  10. Information system revives materials management

    International Nuclear Information System (INIS)

    Hansen, T.

    1995-01-01

    Through a change in philosophy and the development of a new, more efficient information management system, Arizona Public Service Co. (APSW) has, in less than two years, reduced material and service costs by 10 percent. The utility plans to cut these costs form 1993 figures by 25 percent before 2000. The utility is breaking new ground with ongoing implementation of new business processes and the new Materials Logistics Information System (MLIS), which has been co-developed with Texas Instruments Software Division (TISD)

  11. Grenada Education Management Information System

    OpenAIRE

    Porta, Emilio; Klein, Jennifer; Arcia, Gustavo; Nannyonjo, Harriet

    2012-01-01

    The Education Management Information System (EMIS) country report for Grenada includes the following headings: background which includes education data in Grenada, EMIS staff, facilities and equipment, EMIS data, and publications; prerequisites of quality; assurances of integrity; methodological soundness; accuracy and reliability; serviceability; and accessibility.

  12. Security ManagementSystems Approach

    Directory of Open Access Journals (Sweden)

    Milan Kný

    2015-12-01

    Full Text Available The aim of the contribution is the use of the systems approach to treat security management as a practical field and new scientific discipline. The philosophy of systems approach to the solution of problems generally is an adequate methodological basis even for the theory of management. The path to the real optimization of security situation leads only through the holistic and solid solution. Applications of systems analysis and synthesis back up the fact, that systems approach and systems thinking should not absent in security objects. The truthfulness of the claim, that security management is a well-established discipline, depends on ongoing discussion that represents useful process of development of new scientific discipline. At the same time the rationality of science and systematism works as a counterbalance to irrational fear of the whole society, too. Which questions of security remain open in relation to „our interests“? Current problems of Europe should be solved systematically. It is necessary to define the space of interest (territorially the border of the EU or the Schengen area, to implement the system to the object with respect to the borders of the space, to specify the structure and subjects of decision making and implementation.

  13. OSPACS: Ultrasound image management system

    Directory of Open Access Journals (Sweden)

    Bessant Conrad

    2008-06-01

    Full Text Available Abstract Background Ultrasound scanning uses the medical imaging format, DICOM, for electronically storing the images and data associated with a particular scan. Large health care facilities typically use a picture archiving and communication system (PACS for storing and retrieving such images. However, these systems are usually not suitable for managing large collections of anonymized ultrasound images gathered during a clinical screening trial. Results We have developed a system enabling the accurate archiving and management of ultrasound images gathered during a clinical screening trial. It is based upon a Windows application utilizing an open-source DICOM image viewer and a relational database. The system automates the bulk import of DICOM files from removable media by cross-validating the patient information against an external database, anonymizing the data as well as the image, and then storing the contents of the file as a field in a database record. These image records may then be retrieved from the database and presented in a tree-view control so that the user can select particular images for display in a DICOM viewer or export them to external media. Conclusion This system provides error-free automation of ultrasound image archiving and management, suitable for use in a clinical trial. An open-source project has been established to promote continued development of the system.

  14. Automated Car Park Management System

    Science.gov (United States)

    Fabros, J. P.; Tabañag, D.; Espra, A.; Gerasta, O. J.

    2015-06-01

    This study aims to develop a prototype for an Automated Car Park Management System that will increase the quality of service of parking lots through the integration of a smart system that assists motorist in finding vacant parking lot. The research was based on implementing an operating system and a monitoring system for parking system without the use of manpower. This will include Parking Guidance and Information System concept which will efficiently assist motorists and ensures the safety of the vehicles and the valuables inside the vehicle. For monitoring, Optical Character Recognition was employed to monitor and put into list all the cars entering the parking area. All parking events in this system are visible via MATLAB GUI which contain time-in, time-out, time consumed information and also the lot number where the car parks. To put into reality, this system has a payment method, and it comes via a coin slot operation to control the exit gate. The Automated Car Park Management System was successfully built by utilizing microcontrollers specifically one PIC18f4550 and two PIC16F84s and one PIC16F628A.

  15. Charge Management in LISA Pathfinder: The Continuous Discharging Experiment

    Science.gov (United States)

    Ewing, Becca Elizabeth

    2018-01-01

    Test mass charging is a significant source of excess force and force noise in LISA Pathfinder (LPF). The planned design scheme for mitigation of charge induced force noise in LISA is a continuous discharge by UV light illumination. We report on analysis of a charge management experiment on-board LPF conducted during December 2016. We discuss the measurement of test mass charging noise with and without continuous UV illumination, in addition to the dynamic response in the continuous discharge scheme. Results of the continuous discharge system will be discussed for their application to operating LISA with lower test mass charge.

  16. A systems engineering management approach to resource management applications

    Science.gov (United States)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  17. A system for managing information at ATLAS

    International Nuclear Information System (INIS)

    Tilbrook, I.R.

    1993-01-01

    In response to a need for better management of maintenance and document information at the Argonne Tandem-Linear Accelerating System (ATLAS), the ATLAS Information Management System (AIMS) has been created. The system is based on the relational database model. The system's applications use the Alpha-4 relational database management system, a commercially available software package. The system's function and design are described

  18. Do managers experience more stress than employees?

    DEFF Research Database (Denmark)

    Skakon, Janne; Kristensen, Tage S.; Christensen, Karl Bang

    2011-01-01

    -significant with regards to behavioural, somatic and cognitive stress. The difference was partly explained by higher scores in the psychosocial work environment factors; job satisfaction, perceived management quality from their managers, influence, degrees of freedom at work, possibilities for development and meaning....... These results contradict the lay perception of managers being under higher pressure and experiencing more stress than employees. Interventions aiming at reducing employee stress levels, especially regarding behavioural and cognitive stress, could benefit from focussing on psychosocial work environment exposures...

  19. Information Security Management - Part Of The Integrated Management System

    Science.gov (United States)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  20. Metrics for border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2009-07-01

    There are as many unique and disparate manifestations of border systems as there are borders to protect. Border Security is a highly complex system analysis problem with global, regional, national, sector, and border element dimensions for land, water, and air domains. The complexity increases with the multiple, and sometimes conflicting, missions for regulating the flow of people and goods across borders, while securing them for national security. These systems include frontier border surveillance, immigration management and customs functions that must operate in a variety of weather, terrain, operational conditions, cultural constraints, and geopolitical contexts. As part of a Laboratory Directed Research and Development Project 08-684 (Year 1), the team developed a reference framework to decompose this complex system into international/regional, national, and border elements levels covering customs, immigration, and border policing functions. This generalized architecture is relevant to both domestic and international borders. As part of year two of this project (09-1204), the team determined relevant relative measures to better understand border management performance. This paper describes those relative metrics and how they can be used to improve border management systems.

  1. MIMS - MEDICAL INFORMATION MANAGEMENT SYSTEM

    Science.gov (United States)

    Frankowski, J. W.

    1994-01-01

    MIMS, Medical Information Management System is an interactive, general purpose information storage and retrieval system. It was first designed to be used in medical data management, and can be used to handle all aspects of data related to patient care. Other areas of application for MIMS include: managing occupational safety data in the public and private sectors; handling judicial information where speed and accuracy are high priorities; systemizing purchasing and procurement systems; and analyzing organizational cost structures. Because of its free format design, MIMS can offer immediate assistance where manipulation of large data bases is required. File structures, data categories, field lengths and formats, including alphabetic and/or numeric, are all user defined. The user can quickly and efficiently extract, display, and analyze the data. Three means of extracting data are provided: certain short items of information, such as social security numbers, can be used to uniquely identify each record for quick access; records can be selected which match conditions defined by the user; and specific categories of data can be selected. Data may be displayed and analyzed in several ways which include: generating tabular information assembled from comparison of all the records on the system; generating statistical information on numeric data such as means, standard deviations and standard errors; and displaying formatted listings of output data. The MIMS program is written in Microsoft FORTRAN-77. It was designed to operate on IBM Personal Computers and compatibles running under PC or MS DOS 2.00 or higher. MIMS was developed in 1987.

  2. The LHCb Data Management System

    International Nuclear Information System (INIS)

    Baud, J P; Charpentier, Ph; Ciba, K; Lanciotti, E; Màthè, Z; Graciani, R; Remenska, D; Santana, R

    2012-01-01

    The LHCb Data Management System is based on the DIRAC Grid Community Solution. LHCbDirac provides extensions to the basic DMS such as a Bookkeeping System. Datasets are defined as sets of files corresponding to a given query in the Bookkeeping system. Datasets can be manipulated by CLI tools as well as by automatic transformations (removal, replication, processing). A dynamic handling of dataset replication is performed, based on disk space usage at the sites and dataset popularity. For custodial storage, an on-demand recall of files from tape is performed, driven by the requests of the jobs, including disk cache handling. We shall describe the tools that are available for Data Management, from handling of large datasets to basic tools for users as well as for monitoring the dynamic behavior of LHCb Storage capacity.

  3. Normative engineering risk management systems

    International Nuclear Information System (INIS)

    Regan, P.J.; Pate-Cornell, M.E.

    1997-01-01

    This paper describes the design of a normative engineering risk management system that performs four activities: diagnosis, dynamic evolution, decision making, and information gathering. The problem domain can be represented as a partially-observable Markov decision process (POMDP). By decomposing the POMDP into a separate model for each of the four activities, the system enables highly asymmetric models to be tailored to a particular situation. Our goal is to construct a normative system that creates an accurate, concise decision model and that provides timely, reliable results. Conserved model components are constructed at design time whereas unique features are customized at run time. For run-time model components, human guidance is used sparingly to refine the decision model. Customized asymmetry is most extreme for information gathering. An application to the management of fire risks on board offshore oil platforms, with particular emphasis on gas leaks, illustrates the concepts

  4. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  5. Radiology information management system, TOSRIM

    Energy Technology Data Exchange (ETDEWEB)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito (Toshiba Corp., Kawasaki, Kanagawa (Japan))

    1991-02-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author).

  6. Radiology information management system, TOSRIM

    International Nuclear Information System (INIS)

    Tani, Yuichiro; Uchiyama, Akira; Kimura, Hirohito

    1991-01-01

    This is a report on a new type of distributed computer system for radiology departments named 'TOSRIM' (Toshiba radiology information management system), which is designed to be installed between medical diagnosis equipment and a host computer system in a hospital. Recently, a new type of host computer system has been developed which enables doctors to order any of the hospital's entire activities using terminals. By connecting 'TOSRIM' to this type of host computer system, many of the activities of a radiology department can be carried out via terminals without the use of examination requirement forms. As well as being connected to medical diagnosis equipment, 'TOSRIM' can also be connected to a medical imaging system which stores and displays medical images. By means of these connections, doctors will be able to diagnose medical images using display terminals without the need for films. (author)

  7. The Cheetah data management system

    International Nuclear Information System (INIS)

    Kunz, P.F.; Word, G.B.

    1992-09-01

    Cheetah is a data management system based on the C programming language, with support for other languages. Its main goal is to transfer data between memory and I/O steams in a general way. The streams are either associated with disk files or are network data stems. Cheetah provides optional convenience functions to assist in the management of C structures. Cheetah steams are self-describing so that general purpose applications can fully understand an incoming steam. This information can be used to display the data in an incoming steam to the user of an interactive general application, complete with variable names and optional comments

  8. ISO 14000 : environmental management systems

    International Nuclear Information System (INIS)

    Boutin, C.; Emard, C.; Lalonde, G.; Levesque, A.; Robitaille, R.; Rollin, A.L.; Thibeault, I.

    1996-01-01

    This book is addressed to the managers, professionals, and government agents which wish to know the philosophy of the step as well as the stages to be followed for the establishment of a system of environmental management in conformity with the standards of the series ISO 14000. This work locates ISO 14000 in the historical context of its development by describing the bonds with other standards in place of which those of the series ISO 9000. This book answers questions that arise regarding a companies step toward accreditation to ISO 14000

  9. Spatial Data Management System (SDMS)

    Science.gov (United States)

    Hutchison, Mark W.

    1994-01-01

    The Spatial Data Management System (SDMS) is a testbed for retrieval and display of spatially related material. SDMS permits the linkage of large graphical display objects with detail displays and explanations of its smaller components. SDMS combines UNIX workstations, MIT's X Window system, TCP/IP and WAIS information retrieval technology to prototype a means of associating aggregate data linked via spatial orientation. SDMS capitalizes upon and extends previous accomplishments of the Software Technology Branch in the area of Virtual Reality and Automated Library Systems.

  10. Radioactive waste integrated management system

    International Nuclear Information System (INIS)

    Song, D. Y.; Choi, S. S.; Han, B. S.

    2003-01-01

    In this paper, we present an integrated management system for radioactive waste, which can keep watch on the whole transporting process of each drum from nuclear power plant temporary storage house to radioactive waste storage house remotely. Our approach use RFID(Radio Frequency Identification) system, which can recognize the data information without touch, GSP system, which can calculate the current position precisely using the accurate time and distance measured from satellites, and the spread spectrum technology CDMA, which is widely used in the area of mobile communication

  11. OSH management systems in enterprises

    Directory of Open Access Journals (Sweden)

    B. Kalandyk

    2010-04-01

    Full Text Available Nowadays, in modern companies and enterprises, safety means much more than only the evaluation of risk and analysis of accidents. Theactivities in the area of the occupational health and safety should form an integral part of the enterprise management system. According toa framework directive no 89/391/EEC the EU member states are obliged to implement standards related with the occupational health andsafety systems. The standard most popular and used most commonly, as applicable to enterprises of any type, is the international OHSAS18001 system and in Poland Polish Standards PN-N-18001.

  12. Integrated Computer System of Management in Logistics

    Science.gov (United States)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  13. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  14. International safeguards data management system

    International Nuclear Information System (INIS)

    Argentesi, F.; Costantini, L.; Franklin, M.; Dondi, M.G.

    1981-01-01

    The data base management system ''ISADAM'' (i.e. International Safeguards Data Management System) described in this report is intended to facilitate the safeguards authority in making efficient and effective use of accounting reports. ISADAM has been developed using the ADABAS data base management system and is implemented on the JRC-Ispra computer. The evaluation of safeguards declarations focuses on three main objectives: - the requirement of syntactical consistency with the legal conventions of data recording for safeguards accountancy; - the requirement of accounting evidence that there is no material unaccounted for (MUF); - the requirement of semantic consistency with the technological characteristics of the plant and the processing plans of the operator. Section 2 describes in more detail the facilities which ISADAM makes available to a safeguards inspector. Section 3 describes how the MUF variance computation is derived from models of measurement error propagation. Many features of the ISADAM system are automatically provided by ADABAS. The exceptions to this are the utility software designed to: - screen plant declarations before loading into the data base, - prepare variance summary files designed to support real-time computation of MUF and variance of MUF, - provide analyses in response to user requests in interactive or batch mode. Section 4 describes the structure and functions of this software which have been developed by JRC-Ispra

  15. INTEGRATION OF ENVIRONMENTAL MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Tomescu Ada Mirela

    2012-07-01

    Full Text Available The relevance of management as significant factor of business activity can be established on various management systems. These will help to obtain, organise, administrate, evaluate and control particulars: information, quality, environmental protection, health and safety, various resources (time, human, finance, inventory etc. The complexity of nowadays days development, forced us to think ‘integrated’. Sustainable development principles require that environment management policies and practices are not good in themselves but also integrate with all other environmental objectives, and with social and economic development objectives. The principles of sustainable development involve that environment management policies and practices. These are not sound in them-self but also integrate with all other environmental objectives, and with social and economic development objectives. Those objectives were realized, and followed by development of strategies to effects the objective of sustainable development. Environmental management should embrace recent change in the area of environmental protection, and suit the recently regulations of the field -entire legal and economic, as well as perform management systems to meet the requirements of the contemporary model for economic development. These changes are trailed by abandon the conventional approach of environmental protection and it is replaced by sustainable development (SD. The keys and the aims of Cleaner Productions (CP are presented being implemented in various companies as a non-formalised environmental management system (EMS. This concept is suggested here as a proper model for practice where possible environmental harmful technologies are used -e.g. Rosia Montana. Showing the features and the power of CP this paper is a signal oriented to involve the awareness of policy-makers and top management of diverse Romanian companies. Many companies in European countries are developing

  16. "Smart" Vehicle Management System: A Necessity for Future Endeavors

    Science.gov (United States)

    Haddock, A. T.; Olden, G. W.; Barnes, P. K.

    2018-02-01

    The "Smart" Vehicle Management System (VMS) will give an overview of how a robust VMS would enable experiments to be conducted on the spacecraft in both manned and unmanned states, increasing the scientific benefits.

  17. Operational experiences and upgradation of waste management facilities Trombay, India

    International Nuclear Information System (INIS)

    Chander, Mahesh; Bodke, S.B.; Bansal, N.K.

    2001-01-01

    Full text: Waste Management Facilities Trombay provide services for the safe management of radioactive wastes generated from the operation of non power sources at Bhabha Atomic Research Centre, India. The paper describes in detail the current operational experience and facility upgradation by way of revamping of existing processes equipment and systems and augmentation of the facility by way of introducing latest processes and technologies to enhance the safety. Radioactive wastes are generated from the operation of research reactors, fuel fabrication, spent fuel reprocessing, research labs. manufacture of sealed sources and labeled compounds. Use of radiation sources in the field of medical, agriculture and industry also leads to generation of assorted solid waste and spent sealed radiation sources which require proper waste management. Waste Management Facilities Trombay comprise of Effluent Treatment Plant (ETP), Decontamination Centre (DC) and Radioactive Solid Waste Management Site (RSMS). Low level radioactive liquid effluents are received at ETP. Plant has 100 M 3 /day treatment capacity. Decontamination of liquid effluents is effected by chemical treatment method using co- precipitation as a process. Plant has 1800 M 3 of storage capacity. Chemical treatment system comprises of clarifloculator, static mixer and chemical feed tanks. Plant has concentrate management facility where chemical sludge is centrifuged to effect volume reduction of more that 15. Thickened sludge is immobilized in cement matrix. Decontamination Centre caters to the need of equipment decontamination from research reactors. Process used is ultrasonic chemical decontamination. Besides this DC provides services for decontamination of protective wears. Radioactive Solid Waste Management Site is responsible for the safe management of solid waste generated at various research reactors, plants, laboratories in Bhabha Atomic Research Centre. Spent sealed radiation sources are also stored

  18. Experience with enterocutaneous fistula management in a district ...

    African Journals Online (AJOL)

    Experience with enterocutaneous fistula management in a district hospital in Nigeria. ... Malnutrition and sepsis are the leading causes of death. There are no clear guidelines for optimal nutritional management. Aggressive measures to maintain positive nitrogen balance is the ultimate goal of nutritional management.

  19. Knowledge management systems in practice

    DEFF Research Database (Denmark)

    Tørning, Kristian

    is to directly seek to change the user's behavior, i.e., persuading more knowledge sharing. The main contribution is an indication of an anomaly with regards to the strategic approach towards knowledge management, where knowledge sharing is seen as an effort by which companies can gain a competitive advantage......This dissertation contributes to the existing body of knowledge on how we design computer systems, particularly multiuser software for knowledge sharing and creation in globally diffused companies. This is achieved by conducting a work place study of a global industrial engineering conglomerate...... which has the strategy of working with knowledge in the form of "best practices" meant to boost performance. The thesis explores the situation that workers are in, since they are meant to share and develop "best practices" knowledge in a portal based Knowledge Management System (KMS). The study...

  20. Multilevel Workflow System in the ATLAS Experiment

    CERN Document Server

    Borodin, M; The ATLAS collaboration; De, K; Golubkov, D; Klimentov, A; Maeno, T; Vaniachine, A

    2014-01-01

    The ATLAS experiment is scaling up Big Data processing for the next LHC run using a multilevel workflow system comprised of many layers. In Big Data processing ATLAS deals with datasets, not individual files. Similarly a task (comprised of many jobs) has become a unit of the ATLAS workflow in distributed computing, with about 0.8M tasks processed per year. In order to manage the diversity of LHC physics (exceeding 35K physics samples per year), the individual data processing tasks are organized into workflows. For example, the Monte Carlo workflow is composed of many steps: generate or configure hard-processes, hadronize signal and minimum-bias (pileup) events, simulate energy deposition in the ATLAS detector, digitize electronics response, simulate triggers, reconstruct data, convert the reconstructed data into ROOT ntuples for physics analysis, etc. Outputs are merged and/or filtered as necessary to optimize the chain. The bi-level workflow manager - ProdSys2 - generates actual workflow tasks and their jobs...

  1. Multilevel Workflow System in the ATLAS Experiment

    CERN Document Server

    Borodin, M; The ATLAS collaboration; Golubkov, D; Klimentov, A; Maeno, T; Vaniachine, A

    2015-01-01

    The ATLAS experiment is scaling up Big Data processing for the next LHC run using a multilevel workflow system comprised of many layers. In Big Data processing ATLAS deals with datasets, not individual files. Similarly a task (comprised of many jobs) has become a unit of the ATLAS workflow in distributed computing, with about 0.8M tasks processed per year. In order to manage the diversity of LHC physics (exceeding 35K physics samples per year), the individual data processing tasks are organized into workflows. For example, the Monte Carlo workflow is composed of many steps: generate or configure hard-processes, hadronize signal and minimum-bias (pileup) events, simulate energy deposition in the ATLAS detector, digitize electronics response, simulate triggers, reconstruct data, convert the reconstructed data into ROOT ntuples for physics analysis, etc. Outputs are merged and/or filtered as necessary to optimize the chain. The bi-level workflow manager - ProdSys2 - generates actual workflow tasks and their jobs...

  2. Experiences from implementation of ICT for resource management in small construction companies

    DEFF Research Database (Denmark)

    Svidt, Kjeld; Christiansson, Per

    2006-01-01

    This paper summarizes experiences from the process of implementation of ICT-based systems for resource management in small construction companies. The initial decision process, system requirements specification and integration, education and staff training, and end user experiences were followed...... the building domain as well as ICT tools providers....

  3. ISO 9001 quality management systems

    CERN Document Server

    Natarajan, Dhanasekharan

    2017-01-01

    This book explains the requirements of ISO 9001 for establishing quality management system (QMS) for an organization. The requirements are illustrated with examples from industries for understanding the requirements and preparing the documents of QMS with high clarity. Methods of integrating ISO 9001 requirements with enterprise resource planning (ERP) software are presented. The software integrated approach enables process owners to focus on their core tasks of achieving the planned outputs of processes and the software generates quality records automatically.

  4. ISO 9000 Quality Management System

    Science.gov (United States)

    Hadjicostas, Evsevios

    The ISO 9000 series describes a quality management system applicable to any organization. In this chapter we present the requirements of the standard in a way that is as close as possible to the needs of analytical laboratories. The sequence of the requirements follows that in the ISO 9001:2008 standard. In addition, the guidelines for performance improvement set out in the ISO 9004 are reviewed. Both standards should be used as a reference as well as the basis for further elaboration.

  5. The quality management system applied at PRPN

    International Nuclear Information System (INIS)

    Benar Bukit

    2007-01-01

    The ISO 9001-2000 is an International standard for quality management systems. The application of this quality management system is for guaranteeing that the organizations products will fulfill requirements set by its customers. Here the steps taken to apply the quality management system at PRPN are expounded in five main parts, namely quality management system, responsibilities of the management, resources, product realization, measurement, analysis and repair. (author)

  6. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  7. Integrated Management System Incorporating Quality Management and Management of Environment, Health and Occupational Safety

    International Nuclear Information System (INIS)

    Manchev, B.; Nenkova, B.; Tomov, E.

    2012-01-01

    aspects having impact on the environment; management of the health and occupational safety. This proposal for presentation at the conference aim at sharing the experience, the problems arising and ways of their solution during the process of development and introducing of an Integrated Management System on the basis of introduced and certified Quality Management System.(author).

  8. Customer experience in marketing: History, concept and management

    OpenAIRE

    Štavljanin Velimir

    2017-01-01

    Companies are nowadays faced with challenges regarding interaction with customers through various touchpoints in multichannel environment. Key priority in that situation is to manage all those touchpoints in such a way to optimize customer experience. In a context like this customer experience management is becoming a priority for a large number of companies. The aim of this paper is to clarify the concept of customer experience, bring it closer to the academic and practitioner community, and...

  9. Implementing Management Systems-Based Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Campisi, John A.; Reese, Robert T.

    1999-05-03

    A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'~arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES&H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in

  10. Implementing Management Systems-Based Assessments

    International Nuclear Information System (INIS)

    Campisi, John A.; Reese, Robert T.

    1999-01-01

    A management system approach for evaluating environment, safety, health, and quality is in use at Sandia National Laboratories (SNL). Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy under contract DE-AC04-94AL85000. As a multi-program national laboratory, SNL has many diverse operations including research, engineering development and applications, production, and central services supporting all activities and operations. Basic research examples include fusion power generation, nuclear reactor experiments, and investigation of combustion processes. Engineering development examples are design, testing, and prototype developments of micro-mechanical systems for safe'arding computer systems, air bags for automobiles, satellite systems, design of transportation systems for nuclear materials, and systems for use in medical applications such as diagnostics and surgery. Production operations include manufacture of instrumented detection devices, radioisotopes, and replacement parts for previously produced engineered systems. Support services include facilities engineering, construction, and site management, site security, packaging and transportation of hazardous materials wastes, ES ampersand H functional programs to establish requirements and guidance to comply with federal, state, local, and contractual requirements and work safety. In this diverse environment, unlike more traditional single function business units, an integrated consistent management system is not typical. Instead, each type of diverse activity has its own management system designed and distributed around the operations, personnel, customers, and facilities (e.g., hazards involved, security, regulatory requirements, and locations). Laboratory managers are not likely to have experience in the more traditional hierarchical or command and control structures and thus do not share oversight expectations found in

  11. Management information systems software evaluation

    International Nuclear Information System (INIS)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D.

    1995-01-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco

  12. Management information systems software evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Al-Tunisi, N.; Ghazzawi, A.; Gruyaert, F.; Clarke, D. [Saudi Aramco, Dhahran (Saudi Arabia). Process and Control Systems Dept.

    1995-11-01

    In November 1993, Saudi Aramco management endorsed a proposal to coordinate the development of the Management Information Systems (MISs) of four concurrent projects for its facilities Controls Modernization Program. The affected projects were the Ras Tanura Refinery Upgrade Project, the Abqaiq Plant Controls Modernization and the Shedgum and Uthmaniyah Gas plants Control Upgrade Projects. All of these projects had a significant requirement of MISs in their scope. Under the leadership of the Process and Control Systems Department, and MIS Coordination Team was formed with representatives of several departments. An MIS Applications Evaluation procedure was developed based on the Kepner Tregoe Decisions Analysis Process and general questionnaires were sent to over a hundred potential Vendors. The applications were divided into several categories, such as: Data Capture and Historization, Human User Interface, Trending, Reporting, Graphic Displays, Data Reconciliation, Statistical Analysis, Expert Systems, Maintenance Applications, Document Management and Operations Planning and Scheduling. For each of the MIS Application areas, detailed follow-up questionnaires were used to short list the candidate products. In May and June 1994, selected Vendors were invited to Saudi Arabia for an Exhibition which was open to all Saudi Aramco employees. In conjunction with this, the Vendors were subjected to a rigorous product testing exercise by independent teams of testers. The paper will describe the methods used and the lessons learned in this extensive software evaluation phase, which was a first for Saudi Aramco.

  13. Managing obesity in pharmacy: the Australian experience.

    Science.gov (United States)

    Um, Irene S I; Armour, Carol; Krass, Ines; Gill, Timothy; Chaar, Betty B

    2010-12-01

    To explore pharmacists' opinions about the provision of weight management services in community pharmacy and their attitudes towards the establishment of an accredited training course in weight management in pharmacy. Interviews were conducted with practising pharmacists on site in various community pharmacies in metropolitan Sydney, Australia. In-depth, semi-structured interviews with twenty practising pharmacists were conducted. Of the twenty interviewed pharmacists, sixteen were involved in the provision of one or more pharmacy based weight management programs in their pharmacies. Interviews were audio-recorded, transcribed and analysed using the grounded theory approach. The data were thematically analysed to identify facilitators and perceived barriers to the provision of high quality services, and pharmacists' willingness to undertake training and accreditation. Participants clearly perceived a role for pharmacy in weight management. Key facilitators to provision of service were accessibility and the perception of pharmacists as trustworthy healthcare professionals. The pharmacists proposed collaboration with other healthcare professionals in order to provide a service incorporating diet, exercise and behavioural therapy. A program that was not-product-centred, and supported by ethical marketing was favoured. Appropriate training and accreditation were considered essential to assuring the quality of such services. Barriers to the provision of high quality services identified were: remuneration, pharmacy infrastructure, client demand and the current marketing of product-centred programs. Australian pharmacists believe there is a role for pharmacy in weight management, provided training in accredited programs is made available. A holistic, evidence-based, multi-disciplinary service model has been identified as ideal.

  14. Strategic management of nuclear technology information through the KNGR NIC experience

    Energy Technology Data Exchange (ETDEWEB)

    Kang, G. D.; Moon, C. G. [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    2000-05-01

    The key to the success of nuclear information management depends on whether nuclear engineers focus their attention on such management or not. This paper focus to strategic management of nuclear technology information through the KNGR NIC experience. The present KEPCO systems on nuclear information are largely divided into four parts, which are Integrated NPP Information System, System by Business Process Reengineering for Construction, KNGR IMS and Document Management Systems of Plant DDCC. In order to accommodate effective system integration, it is not desirable that a system is subordinate to others because each system has its own work flows and practices site by site. Therefore for good NIS, the system should be developed by web-based, local computer system and bottom-up approach. NIC management have to focus on domain control, nuclear portal service and development of search engine.

  15. Strategic management of nuclear technology information through the KNGR NIC experience

    International Nuclear Information System (INIS)

    Kang, G. D.; Moon, C. G.

    2000-01-01

    The key to the success of nuclear information management depends on whether nuclear engineers focus their attention on such management or not. This paper focus to strategic management of nuclear technology information through the KNGR NIC experience. The present KEPCO systems on nuclear information are largely divided into four parts, which are Integrated NPP Information System, System by Business Process Reengineering for Construction, KNGR IMS and Document Management Systems of Plant DDCC. In order to accommodate effective system integration, it is not desirable that a system is subordinate to others because each system has its own work flows and practices site by site. Therefore for good NIS, the system should be developed by web-based, local computer system and bottom-up approach. NIC management have to focus on domain control, nuclear portal service and development of search engine

  16. Multiple Challenges of Flexible Workforce Management: the contract managers experience

    Directory of Open Access Journals (Sweden)

    Yana Torres de Magalhães

    2010-07-01

    Full Text Available This article presents the results of a survey that had the purpose to evaluate the human resources (HR practices adopted by a Brazilian industrial corporation from the viewpoint of contracting out managers to deal with four flexible workforce management challenges: qualification; quality; commitment; standardization of outsourcing services. These HR practices are still little discussed by scholars. So, this is the main contribution of this article. It is also virtually nonexistent in the literature studies that encompass analysis about HR practices to deal with major challenges of outsourcing throughout the viewpoint of contracting out managers. We performed 15 semi-structured interviews with contracting out managers. It was also performed a documental analysis about the rules of outsourcing practices of the corporation. We found management practices to deal with each of the four challenges presented. The management of contracts and the provision of training programs were the most prominent of the related practices. The results show that Brazillian labor laws contribute to the segregation of temporary workers, because the companies avoid a more direct relationship fearing legal constraints. Although several efforts were put to improve the work conditions of the flexible workforce, these workers are still stigmatized, seen and treated as less important than direct employers; this causes negative impacts on commitment. The decision to use flexible workforce by companies is still mainly due to cost savings. Therefore, there is still a long way to improve HR practices related to temporary workers in order to avoid losses for all the social actors envolved.

  17. Licensing management system prototype system design

    International Nuclear Information System (INIS)

    Immerman, W.H.; Arcuni, A.A.; Elliott, J.M.; Chapman, L.D.

    1983-11-01

    This report is a design document for a prototype implementation of a licensing management system (LMS) as defined in SAND83-7080. It describes the concept of operations for full implementation of an LMS in accordance with the previously defined functional requirements. It defines a subset of a full LMS suitable for meeting prototype implementation goals, and proposes a system design for this subset. The report describes overall system design considerations consistent with, but more explicit than the general characteristics required by the LMS functional definition. A high level design is presented for just those functions selected for prototype implementation. The report also provides a data element dictionary describing the structured logical data elements required to implement the selected functions

  18. Cost Optimal System Identification Experiment Design

    DEFF Research Database (Denmark)

    Kirkegaard, Poul Henning

    A structural system identification experiment design method is formulated in the light of decision theory, structural reliability theory and optimization theory. The experiment design is based on a preposterior analysis, well-known from the classical decision theory. I.e. the decisions concerning...... the experiment design are not based on obtained experimental data. Instead the decisions are based on the expected experimental data assumed to be obtained from the measurements, estimated based on prior information and engineering judgement. The design method provides a system identification experiment design...... reflecting the cost of the experiment and the value of obtained additional information. An example concerning design of an experiment for parametric identification of a single degree of freedom structural system shows the applicability of the experiment design method....

  19. MANAGEMENT OF RENAL TRAUMA : OUR EXPERIENCE

    OpenAIRE

    Ramesh

    2015-01-01

    INTRODUCTION: The kidney is the most commonly injured genitourinary organ in 1 - 5% of all trauma patients. Blunt trauma is the most common mechanism of injury although penetrating injuries are becoming more common due to increasing violence. The management of patients with blunt abdominal injury has evolved greatly over the last few de...

  20. Surgical management of gynecomastia: 20 years' experience

    NARCIS (Netherlands)

    Lapid, O.; Jolink, F.

    2014-01-01

    Gynecomastia, breast hypertrophy in men, is a common finding. The diagnosis is clinical, and ancillary tests may be performed; however, there is no unanimity in the literature about their use or utility. The mainstay of management is conservative, with a minority of patients being operated on. The

  1. Educators' Experience of Managing Sexually Abused Learners ...

    African Journals Online (AJOL)

    denise

    researchers sought to establish what support these educators felt they needed in order to help alleviate the personal impact that managing sexually abused learners might have on them. A phenomenological approach was employed to address the research questions. Using availability-sampling methods, four educators ...

  2. Educators' Experience of Managing Sexually Abused Learners ...

    African Journals Online (AJOL)

    Using availability-sampling methods, four educators from a local primary school were interviewed and the data systematically analysed in accordance with Morrisette's (1999) seven–step procedural model. The present study confirmed the finding of Skinner (1999) and Mzamo (2003) that managing cases of sexually abused ...

  3. TRAMWAY MANAGEMENT SYSTEM IN INDONESIA

    Directory of Open Access Journals (Sweden)

    Melia Damayanti

    2015-01-01

    Full Text Available Tramway systems, which can carry more passengers than buses at one haul, are now being proposed to meet Indonesia’s public transport requirement. The objective of this research is to analyze the management structures for operating tram in different countries and then propose a suitable organizational structure for operating trams, if re-introduced, in Indonesia. The author chose France (Montpellier tramway, Germany (Karlsruhe tram-train and the UK (Nottingham Express Transit as the role model countries for investigation. From the analysis, the most appropriate organizational structure and suitable tramway management structure for operating tramways implementation in Indonesia. The key features of the research are to establish public transport company by local government to manage all public transport systems, propose tramway construction and operation to exist as separate departments under the tramway team division of the public company, recommend the public transport company to have responsibility for overseeing construction of the trams, operating, and maintaining the trams, suggest local government to own them and have responsibility for tramway strategic policy, control regulation as well as supervision and coordination of the performance of the public transport company, propose joint working between public and private sectors.

  4. Glance Information System for ATLAS Management

    CERN Document Server

    De Oliveira Fernandes Moraes, L; The ATLAS collaboration; Ramos De Azevedo Evora, LH; Karam, K; Fink Grael, F; Pommes, K; Nessi, M; Cirilli, M

    2011-01-01

    ATLAS Experiment is an international collaboration where more than 37 countries, 172 institutes and laboratories, 2900 physicists, engineers, and computer scientists plus 700 students participate. The management of this teamwork involves several aspects such as institute contribution, employment records, members' appointment, authors' list, preparation and publication of papers and speakers nomination. Previously, most of the information was accessible by a limited group of people and the system used was not designed to handle new requirements easily. Moreover, developers had to face problems such as different terminology, diverse data modeling, heterogeneous databases and unlike users needs. Besides that, the maintenance has to be an easy task considering the long lifetime experiment and professionals turnover. The Glance system, a generic mechanism for accessing any database, acts as an intermediate layer isolating the user from the particularities of each database. It retrieves, inserts and updates the dat...

  5. Glance Information System for ATLAS Management

    Science.gov (United States)

    Grael, F. F.; Maidantchik, C.; Évora, L. H. R. A.; Karam, K.; Moraes, L. O. F.; Cirilli, M.; Nessi, M.; Pommès, K.; ATLAS Collaboration

    2011-12-01

    ATLAS Experiment is an international collaboration where more than 37 countries, 172 institutes and laboratories, 2900 physicists, engineers, and computer scientists plus 700 students participate. The management of this teamwork involves several aspects such as institute contribution, employment records, members' appointment, authors' list, preparation and publication of papers and speakers nomination. Previously, most of the information was accessible by a limited group and developers had to face problems such as different terminology, diverse data modeling, heterogeneous databases and unlike users needs. Moreover, the systems were not designed to handle new requirements. The maintenance has to be an easy task due to the long lifetime experiment and professionals turnover. The Glance system, a generic mechanism for accessing any database, acts as an intermediate layer isolating the user from the particularities of each database. It retrieves, inserts and updates the database independently of its technology and modeling. Relying on Glance, a group of systems were built to support the ATLAS management and operation aspects: ATLAS Membership, ATLAS Appointments, ATLAS Speakers, ATLAS Analysis Follow-Up, ATLAS Conference Notes, ATLAS Thesis, ATLAS Traceability and DSS Alarms Viewer. This paper presents the overview of the Glance information framework and describes the privilege mechanism developed to grant different level of access for each member and system.

  6. Management of Hotel Dining Information System

    OpenAIRE

    Liu, Fangyi

    2010-01-01

    Dining hotel management is more completed, more accurately, and effectively method for hotel and dining industries. It is an application based on modern hotel market. The information management system is already widely used in many fields at moment. Nowadays, with the dining hotel industries development, an advanced and scientific management system that could be more detailed and secure is needed. Hotel Dining Management system is extremely practical in the present hotel industry dining manag...

  7. Experience with FreeStyle Libre Flash glucose monitoring system in management of refractory dumping syndrome in pregnancy shortly after bariatric surgery

    OpenAIRE

    Novodvorsky, Peter; Walkinshaw, Emma; Rahman, Waliur; Gordon, Valerie; Towse, Karen; Mitchell, Sarah; Selvarajah, Dinesh; Madhuvrata, Priya; Munir, Alia

    2017-01-01

    Bariatric surgery is an effective therapy for obesity but is associated with long-term complications such as dumping syndromes and nutritional deficiencies. We report a case of a 26-year-old caucasian female, with history of morbid obesity and gestational diabetes (GDM), who became pregnant 4 months after Roux-en-Y bypass surgery. She developed GDM during subsequent pregnancy, which was initially managed with metformin and insulin. Nocturnal hypoglycaemia causing sleep disturbance and daytime...

  8. Study and practice in the construction of open physical experiments teaching system

    Science.gov (United States)

    Xu, Yan

    2017-09-01

    Based on open physical experiments teaching system put forward by Ministry of Education, HHU(Hohai University) has carried out the construction of open experimental manage system, which includes course selecting system, teaching system, manage system and information desk. The innovation is in order to mobilize the students’ learning autonomy, cultivate the students’ creative ability and improve teaching quality. Besides, it achieves direct management from school to college to the laboratory and traced manage to the working device regardless of distance and time.

  9. Managing in the Contemporary World: Rape Victims' and Supporters' Experiences of Barriers within the Police and the Health Care System in Tanzania

    Science.gov (United States)

    Muganyizi, Projestine S.; Nystrom, Lennarth; Axemo, Pia; Emmelin, Maria

    2011-01-01

    Grounded theory guided the analysis of 30 in-depth interviews with raped women and community members who had supported raped women in their contact with the police and health care services in Tanzania. The aim of this study was to understand and conceptualize the experiences of the informants by creating a theoretical model focusing on barriers,…

  10. Managing Authentic Experience in the Hypermodern Knowledge Economy

    DEFF Research Database (Denmark)

    Rendtorff, Jacob Dahl

    2017-01-01

    Customers Really Want) has thereby become central to management theory and management philosophy. In this paper, I want to discuss some fundamental and foundational aspects of the concept of authentic experience in the framework of the experience economy as a social reality of late modernity. 1. I......Modern experience economy is about buying and selling experiences, to make intimate experiences and search for customer satisfaction the driving motor of capitalist economies. The concept of experience and more recently the notion of authentic experience (e.g. Pine and Gilmore: Authenticity: What...... will start with a phenomenological perspective on the concept of experience and relate this concept to the idea of authenticity. This will be based on comparison between different concepts of authenticity. 2. After this I will analyze this concept of authenticity in the framework of the kind of society...

  11. Experiences with Ada in an embedded system

    Science.gov (United States)

    Labaugh, Robert J.

    1988-01-01

    Recent experiences with using Ada in a real time environment are described. The application was the control system for an experimental robotic arm. The objectives of the effort were to experiment with developing embedded applications in Ada, evaluating the suitability of the language for the application, and determining the performance of the system. Additional objectives were to develop a control system based on the NASA/NBS Standard Reference Model for Telerobot Control System Architecture (NASREM) in Ada, and to experiment with the control laws and how to incorporate them into the NASREM architecture.

  12. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  13. CONSERVATION MANAGEMENT AND LEGISLATION THE UK EXPERIENCE

    Directory of Open Access Journals (Sweden)

    SIBLEY P. J.

    2003-04-01

    Full Text Available Underpinning the conservation management of Austropotamobius pallipes in the UK is the process of monitoring and reporting crayfish distribution. Should the current trend in the decline of A. pallipes continue, the species could be virtually extinct in mainland Britain within 30 years (SIBLEY, 2003. Conversely, if the increase in the distribution of non-indigenous crayfish species (NICS continues at its current rate, the distribution (by 10 km squares of these species could double within 15 years. These forward projections are based on a number of possibly unreliable assumptions; they illustrate however the magnitude of the challenge facing those concerned with the conservation of A. pallipes in the UK at this time. Recent work in crayfish conservation management in the UK has yielded guidance in several areas including monitoring, habitat enhancement and a re-introduction protocol for A. pallipes (KEMP and HILEY, 2003. Similarly, scientific research continues to inform our understanding of the movement and behaviour of NICS and explores new methods for the potential management of these species. In addition, the protection afforded to A. pallipes by current legislation is key to the long-term survival prospects of the species, albeit with a probable fragmented distribution, across the British Isles and continental Europe. Legal provisions in the UK derive in part from European instructions (e.g. EC Habitats and Species Directive and also from national legislation (e.g. Salmon and Freshwater Fisheries Act (1975 and the Wildlife and Countryside Act (1981. Also, a raft of “quasi-legislation” exists which requires responsible organisations in the UK to implement the white-clawed crayfish biodiversity action plan (BAP. Altogether these provisions constitute a considerable volume of legal protection for crayfish and provide the legal framework on which UK management policy and practice are based.

  14. Improvement of management systems for nuclear facilities

    International Nuclear Information System (INIS)

    2005-01-01

    The area of Quality Management/ Quality Assurance has been changed dramatically over the past years. The nuclear facilities moved from the 'traditional' Quality Assurance approach towards Quality Management Systems, and later a new concept of Integrated Management Systems was introduced. The IAEA is developing a new set of Standards on Integrated Management Systems, which will replace the current 50-C-Q/SG-Q1-Q14 Code. The new set of document will require the integration of all management areas into one coherent management system. The new set of standards on Management Systems promotes the concept of the Integrated Management Systems. Based on new set a big number of documents are under preparation. These documents will address the current issues in the management systems area, e.g. Management of Change, Continuous Improvement, Self-assessment, and Attributes of effective management, etc. Currently NPES is providing a number of TC projects and Extra Budgetary Programmes to assist Member States in this area. The new Standards on Management Systems will be published in 2006. A number of Regulatory bodies already indicated that they would take the new Management System Standards as a basis for the national regulation. This fact will motivate a considerable change in the management of nuclear utilities, requiring a new approach. This activity is suitable for all IAEA Members States with large or limited nuclear capabilities. The service is directed to provide assistance for the management of all organizations carrying on or regulating nuclear activities and facilities

  15. Preliminary experience in the management of tracheobronchial ...

    African Journals Online (AJOL)

    The aim of this study is to describe the experience in our institution with bronchoscopic removal of tracheobronchial foreign bodies and highlight the challenges encountered. This is a retrospective study of all patients referred to the Lagos State University Teaching Hospital with a diagnosis of tracheobronchial foreign body ...

  16. Airline Disruption Management - Perspectives, Experiences and Outlook

    DEFF Research Database (Denmark)

    Kohl, Niklas; Larsen, Allan; Larsen, Jesper

    2004-01-01

    Over the past decade, airlines have become more concerned with developing an optimal flight schedule, with very little slack left to accommodate for any form of variation from the optimal solution. During operation the planned schedules often have to be revised due to disruptions caused by for ex......Over the past decade, airlines have become more concerned with developing an optimal flight schedule, with very little slack left to accommodate for any form of variation from the optimal solution. During operation the planned schedules often have to be revised due to disruptions caused...... by for example severe weather, technical problems and crew sickness. Thus, the field of Airline Disruption Management has emerged within the past few years. The increased focus on cutting cost at the major airlines has intensified the interest in the development of new and cost e cient methods to handle airline...... disruptions. The purpose of this paper is twofold. In the first part it o ers an introduction to airline disruption management, provides the readers with a description of the planning processes and delivers a detailed overview of the numerous aspects of airline disruption management. In the second part we...

  17. Airline Disruption Management - Perspectives, Experiences and Outlook

    DEFF Research Database (Denmark)

    Kohl, Niklas; Larsen, Allan; Larsen, Jesper

    2007-01-01

    Over the past decade, airlines have become more concerned with developing an optimal flight schedule, with very little slack left to accommodate for any form of variation from the optimal solution. During operation the planned schedules often have to be revised due to disruptions caused by for ex......Over the past decade, airlines have become more concerned with developing an optimal flight schedule, with very little slack left to accommodate for any form of variation from the optimal solution. During operation the planned schedules often have to be revised due to disruptions caused...... by for example severe weather, technical problems and crew sickness. Thus, the field of Airline Disruption Management has emerged within the past few years. The increased focus on cutting cost at the major airlines has intensified the interest in the development of new and cost efficient methods to handle...... airline disruptions. The purpose of this paper is twofold. In the first part it offers an introduction to airline disruption management provides the readers with a description of the planning processes and delivers a detailed overview of the numerous aspects of airline disruption management. In the second...

  18. Development of Information Management System for Plant Life Cycle Management

    Energy Technology Data Exchange (ETDEWEB)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong [KOREA HYDRO and NUCLEAR POWER CO. LTD, Daejeon (Korea, Republic of)

    2015-10-15

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system.

  19. Development of Information Management System for Plant Life Cycle Management

    International Nuclear Information System (INIS)

    Byon, SuJin; Lee, SangHyun; Kim, WooJoong

    2015-01-01

    The study subjects are S. Korean NPP(Nuclear Power Plant) construction projects. Design, construction, operations companies have different nuclear power plant construction project structures, and each company has its own Information Management System. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each lifecycle phase. The main perspective of Information Management is moving from the existent document-centric management to the data-centric management. To do so, we intend to integrate information with interfaces among systems. Integrated information management structure and management system are essential for an effective management of the lifecycle information of nuclear power plants that have a lifespan over as much as 80 years. The concept of integration management adopted by the defence, ocean industries or various PLM solution providers is important. Although the NPP project has application systems in each key lifecycle phase, it is more effective to develop and use PLIMS in consideration of the interface and compatibility of information among systems. As an initial study for development of that integrated information management structure, this study is building the system and has interfaced it with a design-stage system

  20. A rural transit asset management system

    Science.gov (United States)

    2005-01-01

    This reports the research undertaken to create an interactive, geographic information system based asset management system for the Alabama Department of Transportation to manage vehicles purchased and operated through Section 5310 and 5311 federal gr...

  1. Senior Management Use of Management Control Systems in Large Companies

    DEFF Research Database (Denmark)

    Willert, Jeanette; Israelsen, Poul; Rohde, Carsten

    2017-01-01

    The use of management control systems in large companies remains relatively unexplored. Indeed, only a few studies of senior managers’ use of management control systems consider multiple controls in companies. This paper explores data from a comprehensive survey of the use of management control...... systems in 120 strategic business units at some of the largest companies in Denmark. The paper identifies how senior management guides and controls their subordinates to meet their companies’ objectives. The presentation and discussion of the results, including citations from executive managers, use...... Ferreira and Otley’s (2009) conceptual and holistic framework for performance management systems, supplemented by elements of contextual factors and organisational culture. Further, selected researchers’ perceptions of the purpose of using management control systems are related to practitioners’ ideas...

  2. ACCEM experience in the implementation of a territorial management system of social and professional skills since immigrant labour insertion and social integration processes in Spain.

    OpenAIRE

    Mahia Cordero, Francisco Javier

    2006-01-01

    International audience; ACCEM is a nation-wide non governmental organization that has developed its work and programmes in the field of the migration since 1992. The entity is present in ten Autonomous Communities of the Spanish state (in twenty-one counties and twenty-six municipalities). Since 1996 and through the Community Initiatives of Employment and Development of Human resources "HORIZON" and "INTEGRA", ACCEM has started experimenting a methodology in order to establish a Territorial M...

  3. Electricity pricing and management systems

    International Nuclear Information System (INIS)

    Sawal, D.M.; Bajapai, Ashok

    1997-01-01

    The installed capacity of power generation in India is at present 80,000 MW. Out of the total 5.79 lakh inhabitated villages in the country, 4.79 villages have been electrified so far. Total number of consumers of electricity are about 95 million in the country. For such a large country with population of over 900 million and area of 32.873 lakh sq. kms., the role of electricity pricing and management system of the power sector is of paramount importance

  4. Environmental Management System ISO 14001

    CERN Document Server

    Haider, Syed

    2010-01-01

    This is a must-have tool for any company in the process of adopting and incorporating the ISO 14001:2004 requirements, this book and accompanying CD-ROM provides the latest updates and amendments and translates the ISO language into actionable strategy. Offering administrative solutions to managers of all sorts, it includes practical examples of policies with objectives, targets, and action plans applicable to any process related industry or an ordinary organization. With template formats and hands-on flow charts to describe step-by-step system development, documentation, and implementation ph

  5. Early experiences in developing and managing the neuroscience gateway.

    Science.gov (United States)

    Sivagnanam, Subhashini; Majumdar, Amit; Yoshimoto, Kenneth; Astakhov, Vadim; Bandrowski, Anita; Martone, MaryAnn; Carnevale, Nicholas T

    2015-02-01

    The last few decades have seen the emergence of computational neuroscience as a mature field where researchers are interested in modeling complex and large neuronal systems and require access to high performance computing machines and associated cyber infrastructure to manage computational workflow and data. The neuronal simulation tools, used in this research field, are also implemented for parallel computers and suitable for high performance computing machines. But using these tools on complex high performance computing machines remains a challenge because of issues with acquiring computer time on these machines located at national supercomputer centers, dealing with complex user interface of these machines, dealing with data management and retrieval. The Neuroscience Gateway is being developed to alleviate and/or hide these barriers to entry for computational neuroscientists. It hides or eliminates, from the point of view of the users, all the administrative and technical barriers and makes parallel neuronal simulation tools easily available and accessible on complex high performance computing machines. It handles the running of jobs and data management and retrieval. This paper shares the early experiences in bringing up this gateway and describes the software architecture it is based on, how it is implemented, and how users can use this for computational neuroscience research using high performance computing at the back end. We also look at parallel scaling of some publicly available neuronal models and analyze the recent usage data of the neuroscience gateway.

  6. Design and Data Management System

    Science.gov (United States)

    Messer, Elizabeth; Messer, Brad; Carter, Judy; Singletary, Todd; Albasini, Colby; Smith, Tammy

    2007-01-01

    The Design and Data Management System (DDMS) was developed to automate the NASA Engineering Order (EO) and Engineering Change Request (ECR) processes at the Propulsion Test Facilities at Stennis Space Center for efficient and effective Configuration Management (CM). Prior to the development of DDMS, the CM system was a manual, paper-based system that required an EO or ECR submitter to walk the changes through the acceptance process to obtain necessary approval signatures. This approval process could take up to two weeks, and was subject to a variety of human errors. The process also requires that the CM office make copies and distribute them to the Configuration Control Board members for review prior to meetings. At any point, there was a potential for an error or loss of the change records, meaning the configuration of record was not accurate. The new Web-based DDMS eliminates unnecessary copies, reduces the time needed to distribute the paperwork, reduces time to gain the necessary signatures, and prevents the variety of errors inherent in the previous manual system. After implementation of the DDMS, all EOs and ECRs can be automatically checked prior to submittal to ensure that the documentation is complete and accurate. Much of the configuration information can be documented in the DDMS through pull-down forms to ensure consistent entries by the engineers and technicians in the field. The software also can electronically route the documents through the signature process to obtain the necessary approvals needed for work authorization. The workflow of the system allows for backups and timestamps that determine the correct routing and completion of all required authorizations in a more timely manner, as well as assuring the quality and accuracy of the configuration documents.

  7. Strategic management of health care information systems: nurse managers' perceptions.

    Science.gov (United States)

    Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha

    2009-01-01

    The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.

  8. Information management system for KNGR

    Energy Technology Data Exchange (ETDEWEB)

    Moon, Chankook; Yoo, Keunbae; Lee, Jinkie [Korea Electric Power Corporation, Seoul (Korea, Republic of); Park, Jaemoon [Korea Power Engineering Co., Inc., Daejeon (Korea, Republic of)

    1996-04-15

    Information management system(IMS) is under development by Korea Electric Power COrporation(KEPCO) joined with KOrea Power Engineering Company(KOPEC) since early 1993 in accordance with Korean Next Generation Reactor(KNGR) project schedule, which is divided into three phases: Phase I(1993-1994), Phase II(1995-Feb.1998), Phase III(1998-2001). Necessity of creating IMS comes from two main purposes: one is from client requirement as described on Electric Power Research Institute(EPRI) Utility Requirement Document(URD) top-tier, the other is from supplier's need to improve productivity whatever it is motivated by management or working group. To satisfy both consumer's and producer's requirements we have set up goals of IMS, to provide configuration management based on network and reliable integrated data base through KNGR's life cycle: i.e.,chronologically, siting, designing, construction, operation and maintenance, and decommissioning. This paper will show what we have done to make the concept during Phase I, and what is a current problem and what will be done through Phase II and III.

  9. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  10. 11. Damus–Kaye–Stansel operation versus bulboventricular foramen enlargement for the management of univentricular heart with systemic outflow obstruction: 17 years experience, a retrospective study

    Directory of Open Access Journals (Sweden)

    Nabil Albahlooli

    2015-10-01

    Conclusion: Although both procedures effectively relieve the obstruction in the systemic outlet chamber, direct BVF enlargement carries higher risk of heart block and new AVVR than the Damus–Kaye–Stansel procedure.

  11. MANAGING SPORTS EXPERIENCES IN THE CONTEXT OF TOURISM

    Directory of Open Access Journals (Sweden)

    Marko Peric

    2015-06-01

    Full Text Available Participation in sports activities combined with unique sports resources can provide people with extraordinary experiences. It is especially true for tourism where sports activities are an important content of stay. The aim of this paper is to analyse how sports experiences could be planned and managed for the tourism purposes from the aspect of sports facility managers. In addition, the interrelations within the four realms of an experience were analysed and supported by proposed management models and examples. Results of the analysis indicate that it is possible for a facility to provide a full spectrum of experiences but only if it meets the standards of professional sports. Recommendations suggested by the paper provide new insight on organising the sports offer in the destination, and can be used by sports facility managers in order to better serve sports and sports tourism needs

  12. Microcomputer Database Management Systems for Bibliographic Data.

    Science.gov (United States)

    Pollard, Richard

    1986-01-01

    Discusses criteria for evaluating microcomputer database management systems (DBMS) used for storage and retrieval of bibliographic data. Two popular types of microcomputer DBMS--file management systems and relational database management systems--are evaluated with respect to these criteria. (Author/MBR)

  13. Incorporating co-management within your environmental management system

    International Nuclear Information System (INIS)

    Melton, D.A.; Maher, S.

    1998-01-01

    The meaning of co-management in the renewable resource sector in terms of government and First Nations relations was explained. Co-management is a short term for co-operative management and has a formative history in the Northwest Territories, particularly in wildlife management. For example, co-management bridged the gap between the aboriginal way of hunting with those of the government. The aboriginal system was associated by self regulation based on traditional knowledge whereas the government system emphasized science, laws and regulations. At present, there are few examples of co-management in the oil and gas sector. This paper described the lessons that could be learned from previous examples of co-management and how those lessons might apply to an Environmental Management System (EMS) for the private oil and gas sector. 3 refs

  14. IMPROVING MANAGEMENT INFORMATION SYSTEMS AT A HIGHER EDUCATIONAL INSTITUTION

    OpenAIRE

    Nataliya N. Fedyakova

    2016-01-01

    Introduction: this paper deals with the foreign and domestic experience of creation and use of educational institution management automation systems. The problems of higher educational institutions management are essential in conditions of growing competition between educational institutions. Their complexity and timeliness defines multifunctional activity of higher educational institutions, diversity of funding sources, the variety of forms and types of educational, scientific, industrial an...

  15. Transition Office Management and Accounting System

    Data.gov (United States)

    US Agency for International Development — TOMAS combined over 20 previously separate systems into one fully integrated management system covering budget, finance, procurement, travel, and emergency contact...

  16. Ground Enterprise Management System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Emergent Space Technologies Inc. proposes to develop the Ground Enterprise Management System (GEMS) for spacecraft ground systems. GEMS will provide situational...

  17. An investigation into the experiences of managers who work flexibly

    OpenAIRE

    Anderson, Deirdre

    2008-01-01

    This thesis explores the experiences of managers who work flexibly. Flexible working policies are prevalent in all organizations in the UK because of the legislation giving specific groups of parents and carers the right to request flexible working. Many organizations extend the policies to all employees, yet the take-up is not as high as expected, particularly among staff at managerial levels. This thesis explores how managers construe and experience flexible working arrangeme...

  18. HRIS: Introduction to Tomorrow's System for Managing Human Resources

    Science.gov (United States)

    Hyde, Albert C.; Shafritz, Jay M.

    1977-01-01

    Reports on the U.S. State Department's experiment with a new concept in management information systems for personnel resources--the Human Resources Information Systems (HRIS). Suggests that the HRIS approach may meet public executives' demands for accurate, rapid, responsive, and flexible information systems. (Author/JG)

  19. Managing recreation areas for quality user experiences: a theoretical framework

    Science.gov (United States)

    Thomas A. More; Gregory J. Buhyoff

    1979-01-01

    The production of opportunities for high-quality visitor experiences is a basic goal of recreation management. Recreation quality can be interpreted using concepts from psychological field theory to relate emotion to the strength of motivation. Applications to on-site management for recreation quality and use regulation are suggested.

  20. Management of cystic lymphangioma: experience of two referral ...

    African Journals Online (AJOL)

    Recent advances in sclerotherapy have expanded contemporary management options, particularly when complete surgical resection is difficult because of the presence of multiple loculi and extensive lesions. This study aims to present our experience in the management of these cases. Material and methods Records of all ...

  1. Experience with Livaditis circular myotomy in management of long ...

    African Journals Online (AJOL)

    Experience with Livaditis circular myotomy in management of long gap TEF. A Singh, M Bajpai, N Sharma, SS Panda. Abstract. Background: Management of long gap oesophageal atresia with tracheoesophageal fi stula (OA TEF) is challenging. Various intra-operative and preoperative manures have been described to ...

  2. Integrated vector management: the Zambian experience.

    Science.gov (United States)

    Chanda, Emmanuel; Masaninga, Fred; Coleman, Michael; Sikaala, Chadwick; Katebe, Cecilia; Macdonald, Michael; Baboo, Kumar S; Govere, John; Manga, Lucien

    2008-08-27

    The Zambian Malaria Control Programme with the Roll Back Malaria (RBM) partners have developed the current National Malaria Strategic Plan (NMSP 2006-2011) which focuses on prevention based on the Integrated Vector Management (IVM) strategy. The introduction and implementation of an IVM strategy was planned in accordance with the World Health Organization (WHO) steps towards IVM implementation namely Introduction Phase, Consolidation Phase and Expansion Phase. IVM has created commitment for Legal and Regulatory policy review, monitoring, Research and a strong stewardship by the chemical suppliers. It has also leveraged additional resources, improved inter-sectoral collaboration, capacity building and enhanced community participation which facilitated a steady scaling up in coverage and utilisation of key preventive interventions. Thus, markedly reducing malaria incidence and case fatalities in the country. Zambia has successfully introduced, consolidated and expanded IVM activities. Resulting in increased coverage and utilization of interventions and markedly reducing malaria-related morbidity and mortality while ensuring a better protection of the environment.

  3. Use of system and business management in the distribution sector - experience from the first year of application of the VV II agreement. IT systems facilitating system management and CRM of utilities; Netznutzungsmanagement - Erfahrungen nach einem Jahr Verbaendevereinbarung II. IT-Systeme erleichtern Arbeitsaufwand

    Energy Technology Data Exchange (ETDEWEB)

    Kreusel, J. [ABB New Ventures GmbH, Mannheim (Germany); Trupke, H. [ABB Utilities GmbH, Mannheim (Germany); Weissmueller, G. [Technische Werke Ludwigshafen am Rhein AG (Germany)

    2002-02-11

    The second, amended version of the pan-industry agreement on NTPA and power systems management is the German VV II agreement, effective for two years now. It is the basis for accelerated market opening and competitive electricity trading in Germany. The article here discusses IT tools that support and facilitate the required CRM, data administration and processing activities of distribution providers as well as their procurement business. Due to the rising number of end-use customers changing their supplier with advanced market opening, business management is under extreme time pressure and has become very complex. The capabilities of the IT systems explained permit highly integrated applications. The mission criticals and the factors of success are elaborated. (orig./CB) [German] Vor gut zwei Jahren trat die zweite Fassung der Verbaendevereinbarung zur Reglung des Netzzugangs im deutschen Strommarkt in Kraft. Sie sollte die reibungsfreie Abwicklung der Netznutzung ermoeglichen und so einen wichtigen Schritt hin zu einem funktionierenden Markt darstellen. Grundsaetzlich ist diese Erwartung erfuellt worden. Allerdings sind nun die Lieferantenwechsel zu einer erheblichen Belastung der Netzbetreiber geworden, deren Beherrschung geeignete Werkzeuge erfordert. Bei der Einfuehrung solcher, inzwischen von verschiedenen Herstellern angebotenen Loesungen ist eine enge Zusammenarbeit zwischen Anwendern und Lieferanten erforderlich, um Komplexitaet und Zeitdruck gleichermassen zu beherrschen. Aufbauend auf der Erfahrung aktueller Projekte erlaeutern die Verfasser, welches die kritischen Erfolgsfaktoren sind. (orig.)

  4. Management experiments for high-elevation agroforestry systems jointly producing matsutake mushrooms and high-quality timber in the Cascade Range of southern Oregon.

    Science.gov (United States)

    James F. Weigand

    1998-01-01

    Experimental prescriptions compare agroforestry systems designed to increase financial returns from high-elevation stands in the southern Oregon Cascade Range. The prescriptions emphasize alternative approaches for joint production of North American matsutake mushrooms (also known as North American pine mushrooms; Tricholoma magnivelare) and high-...

  5. Drop Tower Experiments concerning Fluid Management under Microgravity

    Science.gov (United States)

    Gaulke, Diana; Dreyer, Michael

    2012-07-01

    Transport and positioning of liquid under microgravity is done utilizing capillary forces. Therefore, capillary transport processes have to be understood for a wide variety of space applications, ranging from propellant management in tanks of space transportation systems to eating and drinking devices for astronauts. There are two types of liquid transportation in microgravity using capillary forces. First, the driven liquid flow in open channels where the capillary forces at free surfaces ensure a gas and vapor free flow. Here it is important to know the limiting flow rate through such an open channel before the free surface collapses and gas is sucked into the channel. A number of different experiments at the drop tower Bremen, on sounding rockets and at the ISS have been conducted to analyse this phenomenon within different geometries. As result a geometry dependent theory for calculating the maximum flow rate has been found. On the other hand liquid positioning and transportation requires the capillary pressure of curved surfaces to achieve a liquid flow to a desired area. Especially for space applications the weight of structure has to be taken into account for development. For example liquid positioning in tanks can be achieved via a complicated set of structure filling the whole tank resulting in heavy devices not reasonable in space applications. Astrium developed in cooperation with ZARM a propellant management device much smaller than the tank volume and ensuring a gas and vapour free supply of propellant to the propulsion system. In the drop tower Bremen a model of this device was tested concerning different microgravity scenarios. To further decrease weight and ensure functionality within different scenarios structure elements are designed as perforated geometries. Capillary transport between perforated plates has been analyzed concerning the influence of geometrical pattern of perforations. The conducted experiments at the drop tower Bremen show the

  6. Systems Engineering Management and the Relationship of Systems Engineering to Project Management and Software Engineering (presentation)

    OpenAIRE

    Boehm, Barry; Conrow, Ed; Madachy, Ray; Nidiffer, Ken; Roedler, Garry

    2010-01-01

    Prepared for the 13th Annual NDIA Systems Engineering Conference October 28, 2010, “Achieving Acquisition Excellence Via Effective Systems Engineering”. Panel: Systems Engineering Management and the Relationship of Systems Engineering to Project Management and Software Engineering

  7. An experience of virtual leadership development for human resource managers

    OpenAIRE

    Sherk, Karen E; Nauseda, Fiona; Johnson, Sarah; Liston, Delphine

    2009-01-01

    Abstract Problem Strong leadership and management skills are crucial to finding solutions to the human resource crisis in health. Health professionals and human resource (HR) managers worldwide who are in charge of addressing HR challenges in health systems often lack formal education in leadership and management. Approach Management Sciences for Health (MSH) developed the Virtual Leadership Development Program (VLDP) with support from the United States Agency for International Development (U...

  8. Tourism experience, destination and event management

    Directory of Open Access Journals (Sweden)

    Vitić Andriela

    2007-01-01

    Full Text Available The paper tend to show some of the challenges of matured and world-known tourism destination, as well some of the modalities in keeping and increasing a level of Honolulu cluster's competitiveness. Accordingly, specific tourism experience as socio-cultural dimension of destination competitiveness was evaluated. A core of the paper is primary research of tourism event "Brunch on the Beach" Honolulu, Hawaii, that was done in 2004. Data for analysis were collected during the internship that author did in the City and Country - Honolulu. Internship was a part of JFDP scholarship received by the American Councils for International Educations (ACIE. George Washington University was the institution where the author completed the most of specialization and which gave a support for the internship organization. Questionnaire method was used for the research, while SPSS software was used for data analyses.

  9. Integrated management system laying a foundation for excellence

    International Nuclear Information System (INIS)

    Brissette, S.; Vincent, D.

    2009-01-01

    Integration in its simplest form involves seamless coordination between organizational elements such as organization structure, processes, systems and documents. This paper discusses the concept of integration in regards to managed systems and examines practical issues of marrying evolving standards to organizational design and overall governance. Bruce Power's experience in developing its Management System into a more integrated approach is described. Leadership sponsorship of an integrated programmatic approach using a Governance, Oversight, Support and Perform (GOSP) model of accountability framework within the Management System has been a critical success factor in Bruce Power's journey towards achieving operational excellence. (author)

  10. Designing an oil spill information management system

    Energy Technology Data Exchange (ETDEWEB)

    Douligeris, C.; Collins, J.; Iakovou, E.; Sun, P.; Riggs, K.R. [Univ. of Miami, Coral Gables, FL (United States)

    1995-12-31

    This paper presents the architectural design of OSIMS, an Oil Spill Information Management System, which is an integrated information management tool that consists of an object-relational database management system, an adaptive decision support system, an advanced visualization system (AVS) and a geographic information system (GIS). OSIMS will handle large and diverse databases of environmental, ecological, geographical, engineering, and regulatory information and will be used for risk analysis and contingency planning.

  11. Student Engagement and the College Experience in Hospitality Management

    Science.gov (United States)

    Wray, Michael L.

    2010-01-01

    Student perceptions of competency in Hospitality Management, (HM) and the level of engagement in the college experience were compared between two programs to verify engagement as a construct consisting of three domains; classroom, campus, and off-campus. Administrator and student descriptions of engagement in the college experience described the…

  12. Patient Experience Shows Little Relationship with Hospital Quality Management Strategies

    NARCIS (Netherlands)

    Groene, Oliver; Arah, Onyebuchi A.; Klazinga, Niek S.; Wagner, Cordula; Bartels, Paul D.; Kristensen, Solvejg; Saillour, Florence; Thompson, Andrew; Thompson, Caroline A.; Pfaff, Holger; Dersarkissian, Maral; Sunol, Rosa

    2015-01-01

    Patient-reported experience measures are increasingly being used to routinely monitor the quality of care. With the increasing attention on such measures, hospital managers seek ways to systematically improve patient experience across hospital departments, in particular where outcomes are used for

  13. Defining and managing the quality of wilderness recreation experiences

    Science.gov (United States)

    Robert E. Manning; David W. Lime

    2000-01-01

    There is a substantial body of scientific literature on defining and managing the quality of wilderness experiences. Two conceptual frameworks derived from this literature—carrying capacity and the Recreation Opportunity Spectrum (ROS)—suggest that wilderness recreation experiences can be defined through indicators and standards of quality, and that wilderness...

  14. Frameworks for defining and managing the wilderness experience

    Science.gov (United States)

    Robert E. Manning

    2012-01-01

    A large and growing body of research on outdoor recreation and the wilderness experience has been conducted over the nearly 50 years since passage of the Wilderness Act of 1964. A number of conceptual and empirical frameworks have emerged from this body of knowledge that can be used to help define and manage the wilderness experience.

  15. Microsoft System Center Configuration Manager advanced deployment

    CERN Document Server

    Coupland, Martyn

    2014-01-01

    If you are an experienced Configuration Manager administrator looking to advance your career or get more from your current environment, then this book is ideal for you. Prior experience of deploying and managing a Configuration Manager site would be helpful in following the examples throughout this book.

  16. Electrically Driven Thermal Management: Flight Validation, Experiment Development, Future Technologies

    Science.gov (United States)

    Didion, Jeffrey R.

    2018-01-01

    Electrically Driven Thermal Management is an active research and technology development initiative incorporating ISS technology flight demonstrations (STP-H5), development of Microgravity Science Glovebox (MSG) flight experiment, and laboratory-based investigations of electrically based thermal management techniques. The program targets integrated thermal management for future generations of RF electronics and power electronic devices. This presentation reviews four program elements: i.) results from the Electrohydrodynamic (EHD) Long Term Flight Demonstration launched in February 2017 ii.) development of the Electrically Driven Liquid Film Boiling Experiment iii.) two University based research efforts iv.) development of Oscillating Heat Pipe evaluation at Goddard Space Flight Center.

  17. DABASCO Experiment Data Acquisition and Control System

    International Nuclear Information System (INIS)

    Alberdi Primicia, J.; Artigao Arteaga, A.; Barcala Rieveira, J. M.; Oller Gonzalez, J. C.

    2000-01-01

    DABASCO experiment wants to study the thermohydraulic phenomena produced into the containment area for a severe accident in a nuclear power facility. This document describes the characteristics of the data acquisition and control system used in the experiment. The main elements of the system were a data acquisition board, PCI-MIO-16E-4, and an application written with LaB View. (Author) 5 refs

  18. The Stress Management in the Enterprise Management System

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-05-01

    Full Text Available The article systematizes the classification of the type of management by a number of attributes: horizon of ambition, priority style of interaction between management and managed systems, level of centralization, orientation, consideration of environmental impact, contents, type of activity, and response to deviation. Within terms of the attribute of response to deviations, place of the stress management is allocated near to the harmonic and the risk management. It has been substantiated that the stress management is the enterprise management system aimed at overcoming unwanted deviations that are significant, extreme, and have a significant negative impact on the operation of enterprise. In the structure of the stress management, the following integral components have been allocated and characterized: crisis, adaptive, reactive, fears, and anticipative.

  19. Experience as Knowledge in a New Product Development Team: Implications for Knowledge Management

    Science.gov (United States)

    Cooper, Lynne P.

    2009-01-01

    This study was conducted to better understand how New Product Development (NPD) team members apply their experiences to meet the task needs of their project. Although "experience" is highly valued in team members, little research has looked specifically at experiences as a type of knowledge, and how this knowledge is used in work settings. This research evaluated nearly 200 instances where team members referenced past experiences during team meetings. During these experience exchanges, team members structured the sharing of their experiences to include three common elements: the source of the experience, the nature of the experience, and the degree of relevance to the current work of the team. The experiences fell into four categories: people (relationships), process, product, and politics. This paper describes how team members structured, applied, and integrated their individual experiences and presents the resulting implications for knowledge management systems that wish to exploit experience knowledge.

  20. The Experiment in the Management of Human Capital Creativity

    OpenAIRE

    Anna Lipka; Alicja Winnicka-Wejs; Stanisław Waszczak

    2017-01-01

    The article includes the content of sample experiments whose results may be useful in the management of human capital creativity. It presents selected experiment concepts concerning ideational fluency, flexibility and originality and their subordination to basic patterns: simple real experimental patterns, simple basic pre-experimental patterns, simple basic quasi-experimental patterns. In addition, it includes the account of the experiment on attitude shaping. Methodical, ethical and economi...

  1. Strategic Public Management - Selected Experiences with BSC Implementation

    Directory of Open Access Journals (Sweden)

    Milan PŮČEK

    2014-02-01

    Full Text Available Elements associated with modern approaches towards public management have been gaining ground in various forms in the Czech public administration, especially in the last decade. They reflect the priorities of the public administration reform and the enhanced opportunities for co-financing the implementation of new management tools from European funds. This article summarizes the experience of strategic management, based on the analysis of secondary sources and on the experience of one of the authors who has worked as manager in several public administration/public sector institutions. In the practical part, the article focuses on the potential and limits of implementation of the Balanced Scorecard using the practical experience together with the implementation of this instrument at the level of city and ministry.

  2. Clinical nursing leaders', team members' and service managers' experiences of implementing evidence at a local level.

    Science.gov (United States)

    Kitson, Alison; Silverston, Heidi; Wiechula, Rick; Zeitz, Kathryn; Marcoionni, Danni; Page, Tammy

    2011-05-01

    To describe the experiences of 14 clinical nursing leaders introducing a knowledge translation (KT) project into one metropolitan acute care hospital in South Australia. The study also explored team members' and service managers' experiences. KT strategies assume that local (nursing) clinical leaders have the capacity and capability to champion innovation combining positional leadership roles (ward leader) with a project lead role. There is limited evidence to support these assumptions. Semi-structured interviews of clinical nursing leaders and managers were undertaken at month 4 and 12 of the project. Data were also collected from the interdisciplinary team members (n = 28). Clinical nursing leaders identified risks and anxieties associated with taking on an additional leadership role, whereas managers acknowledged the multiple pressures on the system and the need for local level innovation. Team members generally reported positive experiences. With support, clinical nursing leaders can effectively embrace KT project leadership roles that complement their positional leadership roles. Clinical nursing leaders' experiences differed from nursing and medical managers' experiences.   Managers need to be more attuned to the personal risks local leaders experience, providing support for leaders to experiment and innovate. Managers need to integrate local priorities with broader system wide agendas. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  3. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  4. Business Management System Support Analysis

    Science.gov (United States)

    Parikh, Jay

    2008-01-01

    The purpose of this research project was to develop a searchable database compiled with internal and external audit findings/observations. The data will correspond to the findings and observations from the date of Center-wide implementation of the ISO 9001-2000 standard to the present (2003-2008). It was derived and extracted from several sources and was in multiple formats. Once extracted, categorization of the findings/observations would be possible. The final data was mapped to the ISO 9001-2000 standard with the understanding that it will be displayed graphically. The data will be used to verify trends, associate risks, and establish timelines to identify strengths and weaknesses to determine areas of improvement in the Kennedy Space Center Business Management System Internal Audit Program.

  5. An Introduction to Database Management Systems.

    Science.gov (United States)

    Warden, William H., III; Warden, Bette M.

    1984-01-01

    Description of database management systems for microcomputers highlights system features and factors to consider in microcomputer system selection. A method for ranking database management systems is explained and applied to a defined need, i.e., software support for indexing a weekly newspaper. A glossary of terms and 32-item bibliography are…

  6. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  7. The Experiment in the Management of Human Capital Creativity

    Directory of Open Access Journals (Sweden)

    Anna Lipka

    2017-02-01

    Full Text Available The article includes the content of sample experiments whose results may be useful in the management of human capital creativity. It presents selected experiment concepts concerning ideational fluency, flexibility and originality and their subordination to basic patterns: simple real experimental patterns, simple basic pre-experimental patterns, simple basic quasi-experimental patterns. In addition, it includes the account of the experiment on attitude shaping. Methodical, ethical and economic limits of experiment application were determined, based on the analysis of reference books related to the method of the experiment and creativity management. The way to understand the constraints is included below in the glossary of key phrases. The subject of the study was chosen on the basis of the existent research gap. As results from analyses based on the study of foreign reference books conducted by J. Samul [2015], the experiment is still a rarely used research method in the area of human capital management. It can, therefore, be concluded that the same also (and perhaps even more so applies to experiments concerning the management of employee creativity.

  8. Educational Management Information Systems: Progress and Prospectives.

    Science.gov (United States)

    Evans, John A.

    An educational management information system is a network of communication channels, information sources, computer storage and retrieval devices, and processing routines that provide data to educational managers at different levels, places, and times to facilitate decisionmaking. Management information systems should be differentiated from…

  9. Waste Management System Description Document (WMSD)

    International Nuclear Information System (INIS)

    1992-02-01

    This report is an appendix of the ''Waste Management Description Project, Revision 1''. This appendix is about the interim approach for the technical baseline of the waste management system. It describes the documentation and regulations of the waste management system requirements and description. (MB)

  10. A method and system for power management

    NARCIS (Netherlands)

    Burchard, Arthur Tadeusz; Goossens, Koos Gerard Willen; Milutinovic, A.; Molnos, Anca Mariana; Steffens, Elisabeth Francisca Maria

    2009-01-01

    A method and system for power management is provided. To control power supplied to a second electronic device (106), an electronic system (100) comprises a power management subsystem (110), a first electronic device (102); The power management subsystem (110) monitors the power consumed by the first

  11. School Management Information Systems in Primary Schools

    Science.gov (United States)

    Demir, Kamile

    2006-01-01

    Developments in information technologies have been impacting upon educational organizations. Principals have been using management information systems to improve the efficiency of administrative services. The aim of this research is to explore principals' perceptions about management information systems and how school management information…

  12. 76 FR 14592 - Safety Management System; Withdrawal

    Science.gov (United States)

    2011-03-17

    ...-06A] RIN 2120-AJ15 Safety Management System; Withdrawal AGENCY: Federal Aviation Administration (FAA... (``product/ service providers'') to develop a Safety Management System (SMS). The FAA is withdrawing the... management with a set of robust decision-making tools to use to improve safety. The FAA received 89 comments...

  13. The Air Program Information Management System (APIMS)

    Science.gov (United States)

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  14. Effective management of bone fractures with the IlluminOss® photodynamic bone stabilization system: initial clinical experience from the European Union registry

    Directory of Open Access Journals (Sweden)

    Thomas Gausepohl

    2017-02-01

    Full Text Available The IlluminOss® system (IS uses a light-curable polymer contained within an inflatable balloon catheter, forming a patient customized intramedullary implant. A registry was established in Germany and The Netherlands to prospectively collect technical and clinical outcomes in patients treated with IS for fractures of the phalange, metacarpal, radius, ulna, distal radius, fibula, clavicle and/or olecranon. Humeral, femoral, tibial and pelvic fractures were included under compassionate use. Procedural success included successful placement of the device at the target fracture site and achievement of fracture stabilization. Clinical and radiographic assessments were made postoperatively through 12 months. One hundred thirty two patients (149 fractures were enrolled with most fractures (85% resulting from low-energy trauma. Simple fractures predominated (47% followed by complex (23% and wedge (16% fractures. Procedural success was achieved in all patients and no implants required removal or revision. Normal range of motion was realized in 87% of fractures. Radiographically, there was substantial cortical bridging, total dissolution of the fracture line, and complete fracture healing. Across a variety of fracture types, the IS provides a safe and effective approach for rapid healing and functional recovery.

  15. Effective Management of Bone Fractures with the Illuminoss® Photodynamic Bone Stabilization System: Initial Clinical Experience from the European Union Registry.

    Science.gov (United States)

    Gausepohl, Thomas; Pennig, Dietmar; Heck, Steffen; Gick, Sascha; Vegt, Paul A; Block, Jon E

    2017-02-20

    The IlluminOss ® system (IS) uses a light-curable polymer contained within an inflatable balloon catheter, forming a patient customized intramedullary implant. A registry was established in Germany and The Netherlands to prospectively collect technical and clinical outcomes in patients treated with IS for fractures of the phalange, metacarpal, radius, ulna, distal radius, fibula, clavicle and/or olecranon. Humeral, femoral, tibial and pelvic fractures were included under compassionate use. Procedural success included successful placement of the device at the target fracture site and achievement of fracture stabilization. Clinical and radiographic assessments were made postoperatively through 12 months. One hundred thirty two patients (149 fractures) were enrolled with most fractures (85%) resulting from low-energy trauma. Simple fractures predominated (47%) followed by complex (23%) and wedge (16%) fractures. Procedural success was achieved in all patients and no implants required removal or revision. Normal range of motion was realized in 87% of fractures. Radiographically, there was substantial cortical bridging, total dissolution of the fracture line, and complete fracture healing. Across a variety of fracture types, the IS provides a safe and effective approach for rapid healing and functional recovery.

  16. The Expert Project Management System (EPMS)

    Science.gov (United States)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  17. Structured storage in ATLAS Distributed Data Management: use cases and experiences

    Science.gov (United States)

    Lassnig, Mario; Garonne, Vincent; Molfetas, Angelos; Beermann, Thomas; Dimitrov, Gancho; Canali, Luca; Zang, Donal; Azzurra Chinzer, Lisa

    2012-12-01

    The distributed data management system of the high-energy physics experiment ATLAS has a critical dependency on the Oracle Relational Database Management System. Recently however, the increased appearance of data warehouselike workload in the experiment has put considerable and increasing strain on the Oracle database. In particular, the analysis of archived data, and the aggregation of data for summary purposes has been especially demanding. For this reason, structured storage systems were evaluated to offload the Oracle database, and to handle processing of data in a non-transactional way. This includes distributed file systems like HDFS that support parallel execution of computational tasks on distributed data, as well as non-relational databases like HBase, Cassandra, or MongoDB. In this paper, the most important analysis and aggregation use cases of the data management system are presented, and how structured storage systems were established to process them.

  18. Structured storage in ATLAS Distributed Data Management: use cases and experiences

    CERN Document Server

    Lassnig, M; The ATLAS collaboration; Molfetas, A; Beermann, T; Dimitrov, G; Canali, L; Zang, D; Chinzer, LA

    2012-01-01

    The distributed data management system of the high-energy physics experiment ATLAS has a critical dependency on the Oracle Relational Database Management System. Recently however, the increased appearance of data warehouse-like workload in the experiment has put considerable and increasing strain on the Oracle database. In particular, the analysis of archived data, and the aggregation of data for summary purposes has been especially demanding. For this reason, structured storage systems were evaluated to offload the Oracle database, and to handle processing of data in a non-transactional way. This includes distributed file systems like HDFS that support parallel execution of computational tasks on distributed data, as well as non-relational databases like HBase, Cassandra, or MongoDB. In this paper, the most important analysis and aggregation use cases of the data management system are presented, and how structured storage systems were established to process them.

  19. Case managers' experiences of personal growth: learning from consumers.

    Science.gov (United States)

    Stein, Catherine H; Craft, Scott A

    2007-04-01

    This study examines aspects of case managers' perceived personal growth in their work with consumers. Using a sample of 98 case managers, the psychometric properties of a brief self-report measure of personal growth of case managers were examined. The Case Manager Personal Growth Scale (CMPG) showed good reliability and construct validity as evidenced by negative correlations with scores on professional burnout and positive correlations with personal accomplishment and job satisfaction scores. CMPG scores were unrelated to social desirability scores or caseload size and positively related to age and tenure in the mental health system. Results suggest the strong relevance of the construct of personal growth for case managers.

  20. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  1. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  2. Quality management system in ISTC 'Ukryttia'

    International Nuclear Information System (INIS)

    Ershova, N.N.; Klyuchnikov, A.A.; Lagutin, I.G.

    2003-01-01

    Some structural and certification aspects of ISTC 'Ukryttia' quality system are seen,and main principles of adaptation of existing quality system model to quality management system model in conformity with ISO 9001:2000 standard are shown

  3. Potential of Computerized Maintenance Management System in Facilities Management

    Directory of Open Access Journals (Sweden)

    Noor Farisya Azahar

    2014-07-01

    Full Text Available For some time it has been clear that managing buildings or estates has been carried out in the context of what has become known as facilities management. British Institute of Facilities Management defined facilities management is the integration of multi-disciplinary activities within the built environment and the management of their impact upon people and the workplace. Effective facilities management is vital to the success of an organisation by contributing to the delivery of its strategic and operational objectives. Maintenance of buildings should be given serious attention before (stage design, during and after a building is completed. But total involvement in building maintenance is after the building is completed and during its operations. Residents of and property owners require their building to look attractive, durable and have a peaceful indoor environment and efficient. The objective of the maintenance management system is to stream line the vast maintenance information system to improve the productivity of an industrial plant. a good maintenance management system makes equipment and facilities available. This paper will discuss the fundamental steps of maintenance management program and Computerized Maintenance Management System (CMMS

  4. Mine management system based on PDCA cycle

    Science.gov (United States)

    Wang, Yunliang

    2017-10-01

    The scientific and effective management of mining enterprises has been a major problem for managers. And as modern technical equipment is continuously equipped to the mine, the traditional way of management has been unable to meet the needs, which causes many problems. In response to these questions, we apply PDCA cycle management patterns to mining enterprises in this paper, and establish a scientific and effective management system. After that the efficiency of mine production is greatly improved under the premise of safe production.

  5. ISO 55000: Creating an asset management system.

    Science.gov (United States)

    Bradley, Chris; Main, Kevin

    2015-02-01

    In the October 2014 issue of HEJ, Keith Hamer, group vice-president, Asset Management & Engineering at Sodexo, and marketing director at Asset Wisdom, Kevin Main, argued that the new ISO 55000 standards present facilities managers with an opportunity to create 'a joined-up, whole lifecycle approach' to managing and delivering value from assets. In this article, Kevin Main and Chris Bradley, who runs various asset management projects, examine the process of creating an asset management system.

  6. SOME CONCEPTUAL PROPERTIES FOR KNOWLEDGE MANAGEMENT SYSTEMS DESIGN

    Directory of Open Access Journals (Sweden)

    Vasile MAZILESCU

    2005-01-01

    Full Text Available Knowledge Management Systems (KMS are important tools by which organizations can better useinformation and, more importantly, manage knowledge. Unlike other strategies, knowledge management (KM isdifficult to define because it encompasses a range of concepts, management tasks, technologies, and organizationalpractices, all of which come under the umbrella of the information management. Semantic approaches alloweasier and more efficient training, maintenance, and support knowledge. Current ICT markets are dominated byrelational databases and document-centric information technologies, procedural algorithmic programmingparadigms, and stack architecture. A key driver of global economic growth in the coming decade is the build-out ofbroadband telecommunications and the deployment of intelligent services bundling. This paper introduces themain characteristics of an Intelligent Knowledge Management System as a multi-agent system used in a LearningControl Problem (IKMSLCP. We describe an intelligent KM framework, allowing the observer (a human agentto learn from experience.

  7. INTEGRATIVE AUGMENTATION OF STANDARDIZED MANAGEMENT SYSTEMS

    Directory of Open Access Journals (Sweden)

    Stanislav Karapetrovic

    2008-03-01

    Full Text Available The development, features and integrating abilities of different international standards related to management systems are discussed. A group of such standards that augment the performance of quality management systems in organizations is specifically focused on. The concept, characteristics and an illustrative example of one augmenting standard, namely ISO 10001, are addressed. Integration of standardized augmenting systems, both by themselves and within the overall management system, is examined. It is argued that, in research and practice alike, integrative augmentation represents the future of standardized quality and other management systems.

  8. BETWEEN BALANCED SCORECARD AND QUALITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    Jelena Jovanović

    2008-09-01

    Full Text Available The aim of this research is to analyze parallel implementation of BSC as a strategic management system and quality management system by the principals of ISO 9000 certification. We will analyze advantages and disadvantages of the models. Further more, the research will analyze cumulative advantages of the two systems implementation. The research will present possibilities for BSC implementation in QMS environment, underlining the processes. We will put the accent on improvement of firm's effectiveness by Strategic Management System (BSC and Quality Management System's implementation.

  9. Knowledge-based systems for power management

    Science.gov (United States)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  10. Radiation management computer system for Monju

    International Nuclear Information System (INIS)

    Aoyama, Kei; Yasutomo, Katsumi; Sudou, Takayuki; Yamashita, Masahiro; Hayata, Kenichi; Ueda, Hajime; Hosokawa, Hideo

    2002-01-01

    Radiation management of nuclear power research institutes, nuclear power stations and other such facilities are strictly managed under Japanese laws and management policies. Recently, the momentous issues of more accurate radiation dose management and increased work efficiency has been discussed. Up to now, Fuji Electric Company has supplied a large number of Radiation Management Systems to nuclear power stations and related nuclear facilities. We introduce the new radiation management computer system with adopted WWW technique for Japan Nuclear Cycle Development Institute, MONJU Fast Breeder Reactor (MONJU). (author)

  11. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  12. Managing reality shock: Expectations versus experiences of graduate engineers

    Directory of Open Access Journals (Sweden)

    Sarah Riordan

    2007-10-01

    Full Text Available The objective of the study is an analysis of the relationship between the work expectations and experiences of graduate engineers during their early career period. It reports on discrepancies in graduates’ expectations of the world of work and the reality of the early career stage. Conclusions include recommendations of how "reality shock" can be managed better by both organisations and individuals. Qualitative data were obtained through in-depth interviews with sixteen participants with less than five years work experience, employed in a large utility organisation in the Western Cape. Results indicate that participants experience significant incongruence between their expectations of work and work experiences.

  13. Hospital information management system: an evolutionary knowledge management perspective.

    Science.gov (United States)

    Wadhwa, S; Saxena, Avneet; Wadhwa, Bharat

    2007-01-01

    The evolving paradigm shift resulting from IT, social and technological changes has created a need for developing an innovative knowledge-based healthcare system, which can effectively meet global healthcare system demands and also cater to future trends. The Hospital Information Management System (HIMS) is developed with this sole aim in mind, which helps in processing and management of hospital information not only inside the boundary, but also beyond the hospital boundary, e.g., telemedicine or e-healthcare. The purpose of this paper is to present such kind of functional HIMS, which can efficiently satisfy the current and future system requirements by using Knowledge Management (KM) and data management systems. The HIMS is developed in a KM context, wherein users can share and use the knowledge more effectively. The proposed system is fully compatible with future technical, social, managerial and economical requirements.

  14. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  15. Hippo Experiment Data Access and Subseting System

    Science.gov (United States)

    Krassovski, M.; Hook, L.; Boden, T.

    2014-12-01

    HIAPER Pole-to-Pole Observations (HIPPO) was an NSF- and NOAA-funded, multi-year global airborne research project to survey the latitudinal and vertical distribution of greenhouse and related gases, and aerosols. Project scientists and support staff flew five month-long missions over the Pacific Basin on the NSF/NCAR Gulfstream V, High-performance Instrumented Airborne Platform for Environmental Research (HIAPER) aircraft between January 2009 and September 2011, spread throughout the annual cycle, from the surface to 14 km in altitude, and from 87°N to 67°S. Data from the HIPPO study of greenhouse gases and aerosols are now available to the atmospheric research community and the public. This comprehensive dataset provides the first high-resolution vertically resolved measurements of over 90 unique atmospheric species from nearly pole-to-pole over the Pacific Ocean across all seasons. The suite of atmospheric trace gases and aerosols is pertinent to understanding the carbon cycle and challenging global climate models. This dataset will provide opportunities for research across a broad spectrum of Earth sciences, including those analyzing the evolution in time and space of the greenhouse gases that affect global climate. The Carbon Dioxide Information Analysis Center (CDIAC) at Oak Ridge National Laboratory (ORNL) provides data management support for the HIPPO experiment including long-term data storage and dissemination. CDIAC has developed a relational database to house HIPPO merged 10-second meteorology, atmospheric chemistry, and aerosol data. This data set provides measurements from all Missions, 1 through 5, that took place from January of 2009 to September 2011. This presentation introduces newly build database and web interface, reflects the present state and functionality of the HIPPO Database and Exploration System as well as future plans for expansion and inclusion of combined discrete flask and GC sample GHG, Halocarbon, and hydrocarbon data.

  16. Managing Space System Faults: Coalescing NASA's Views

    Science.gov (United States)

    Muirhead, Brian; Fesq, Lorraine

    2012-01-01

    Managing faults and their resultant failures is a fundamental and critical part of developing and operating aerospace systems. Yet, recent studies have shown that the engineering "discipline" required to manage faults is not widely recognized nor evenly practiced within the NASA community. Attempts to simply name this discipline in recent years has been fraught with controversy among members of the Integrated Systems Health Management (ISHM), Fault Management (FM), Fault Protection (FP), Hazard Analysis (HA), and Aborts communities. Approaches to managing space system faults typically are unique to each organization, with little commonality in the architectures, processes and practices across the industry.

  17. Transport concept of new waste management system (inner packaging system)

    International Nuclear Information System (INIS)

    Hakozaki, K.; Wada, R.

    2004-01-01

    Kobe Steel, Ltd. (KSL) and Transnuclear Tokyo (TNT) have jointly developed a new waste management system concept (called ''Inner packaging system'') for high dose rate wastes generated from nuclear power plants under cooperation with Tokyo Electric Power Company (TEPCO). The inner packaging system is designed as a total management system dedicated to the wastes from nuclear plants in Japan, covering from the wastes conditioning in power plants up to the disposal in final repository. This paper presents the new waste management system concept

  18. Automated support for experience-based software management

    Science.gov (United States)

    Valett, Jon D.

    1992-01-01

    To effectively manage a software development project, the software manager must have access to key information concerning a project's status. This information includes not only data relating to the project of interest, but also, the experience of past development efforts within the environment. This paper describes the concepts and functionality of a software management tool designed to provide this information. This tool, called the Software Management Environment (SME), enables the software manager to compare an ongoing development effort with previous efforts and with models of the 'typical' project within the environment, to predict future project status, to analyze a project's strengths and weaknesses, and to assess the project's quality. In order to provide these functions the tool utilizes a vast corporate memory that includes a data base of software metrics, a set of models and relationships that describe the software development environment, and a set of rules that capture other knowledge and experience of software managers within the environment. Integrating these major concepts into one software management tool, the SME is a model of the type of management tool needed for all software development organizations.

  19. Assessment of light water reactor accident management programs and experience

    International Nuclear Information System (INIS)

    Hammersley, R.J.

    1992-03-01

    The objective of this report is to provide an assessment of the current light water reactor experience regarding accident management programs and associated technology developments. This assessment for light water reactor (LWR) designs is provided as a resource and reference for the development of accident management capabilities for the production reactors at the Savannah River Site. The specific objectives of this assessment are as follows: 1. Perform a review of the NRC, utility, and industry (NUMARC, EPRI) accident management programs and implementation experience. 2. Provide an assessment of the problems and opportunities in developing an accident management program in conjunction or following the Individual Plant Examination process. 3. Review current NRC, utility, and industry technological developments in the areas of computational tools, severe accident predictive tools, diagnostic aids, and severe accident training and simulation

  20. A data handling system for modern and future Fermilab experiments

    Science.gov (United States)

    Illingworth, R. A.

    2014-06-01

    Current and future Fermilab experiments such as Minerva, NOνA, and MicroBoone are now using an improved version of the Fermilab SAM data handling system. SAM was originally used by the CDF and D0 experiments for Run II of the Fermilab Tevatron to provide file metadata and location cataloguing, uploading of new files to tape storage, dataset management, file transfers between global processing sites, and processing history tracking. However SAM was heavily tailored to the Run II environment and required complex and hard to deploy client software, which made it hard to adapt to new experiments. The Fermilab Computing Sector has progressively updated SAM to use modern, standardized, technologies in order to more easily deploy it for current and upcoming Fermilab experiments, and to support the data preservation efforts of the Run II experiments.

  1. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Urban, Mary Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States). Process Modeling and Analysis Group

    2016-05-02

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, and monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.

  2. APPROACH TO ADAPTIVE LEARNING MANAGEMENT SYSTEM DESIGN

    Directory of Open Access Journals (Sweden)

    Vitaly A. Gaevoy

    2014-01-01

    Full Text Available In this paper, we describe how to increase the learning management systems effi ciency by using an adaptive approach. In our work we try and summarize the existing systems; the adaptability absence problem is discovered, programming and architectural adaptive learning management system designing approach is offered. 

  3. Electric Propulsion System Characterization through Experiments

    OpenAIRE

    Hattenberger, Gautier; Drouin, Antoine; Bronz, Murat

    2016-01-01

    International audience; Electrical propulsion system characteristics are very important in UAV design, operation and control. This article presents the characterization of electric propulsion sets through experiments. A motor test bench have been build based on previous experience in order to improve the quality of the measurements. Moreover, the bench fits in a wind tunnel, allowing to perform a complete characterization over the full airspeed range of the considered mini and micro-UAVs. Aft...

  4. Assessing waste management systems using reginalt software

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Camasta, S.F.; Gilbert, T.L.

    1988-03-01

    A method for assessing management systems for low-level radioactive waste is being developed for US Department of Energy. The method is based on benefit-cost-risk analysis. Waste management is broken down into its component steps, which are generation, treatment, packaging, storage, transportation, and disposal. Several different alternatives available for each waste management step are described. A particular waste management system consists of a feasible combination of alternatives for each step. Selecting an optimal waste management system would generally proceed as follows: (1) qualitative considerations are used to narrow down the choice of waste management system alternatives to a manageable number; (2) the costs and risks for each of these system alternatives are evaluated; (3) the number of alternatives is further reduced by eliminating alternatives with similar risks but higher costs, or those with similar costs but higher risks; (4) a trade-off factor between cost and risk is chosen and used to compute the objective function (sum of the cost and risk); and (5) the selection of the optimal waste management system among the remaining alternatives is made by choosing the alternative with the smallest value for the objective function. The authors propose that the REGINALT software system, developed by EG and G Idaho, Inc., as an acid for managers of low-level commerical waste, be augmented for application to the managment of DOE-generated waste. Specific recommendations for modification of the REGINALT system are made. 51 refs., 3 figs., 2 tabs

  5. Management Specialists' Training Social Schemes: World Experience and Russian Specificity

    OpenAIRE

    М А Ignatskaya; G А Kulikovskaya

    2010-01-01

    The article offers the analysis of the issues related to the social administration of professional management personnel training which have become particularly complicated over the past two decades. Social schemes, conditions and factors of management are shown to be closely interconnected with the characteristics of human capital as the basis for social, economic and cultural development of the contemporary society. World experience and Russian specificity in the sphere of human resource man...

  6. Golden parachutes: Changing the experience of unemployment for managers

    OpenAIRE

    Johnson, Anya M.; Jackson, Paul R.

    2012-01-01

    We examined the effect of career transition support and three other situational variables - financial reserves, social inclusion, and a partner - on the psychological strain of unemployed managers. We extended the theories of unemployment by investigating the mechanisms by which these four situational variables affect psychological strain. After using qualitative research to explore managers' experiences during unemployment, we used the themes that emerged from this first study to conduct a s...

  7. Purchasing management experience of Haiyang nuclear power project construction period

    International Nuclear Information System (INIS)

    Ma Yuqin

    2013-01-01

    Purchasing is one of the important aspects to ensure the safety and quality of the nuclear power plant. This paper, combining the purchasing peculiarity and purchasing process of Haiyang nuclear power project, summarizes experiences of Haiyang nuclear power project in promoting its purchasing management level in aspects of purchasing method choosing, purchasing plan management, purchasing process optimization, purchasing contract implementation and purchasing surveillance, etc. (author)

  8. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  9. Learning object repositories as knowledge management systems

    Directory of Open Access Journals (Sweden)

    Demetrios G. Sampson

    2013-06-01

    Full Text Available Over the past years, a number of international initiatives that recognize the importance of sharing and reusing digital educational resources among educational communities through the use of Learning Object Repositories (LORs have emerged. Typically, these initiatives focus on collecting digital educational resources that are offered by their creators for open access and potential reuse. Nevertheless, most of the existing LORs are designed more as digital repositories, rather than as Knowledge Management Systems (KMS. By exploiting KMSs functionalities in LORs would bare the potential to support the organization and sharing of educational communities’ explicit knowledge (depicted in digital educational resources constructed by teachers and/or instructional designers and tacit knowledge (depicted in teachers’ and students’ experiences and interactions of using digital educational resources available in LORs. Within this context, in this paper we study the design and the implementation of fourteen operating LORs from the KMSs’ perspective, so as to identify additional functionalities that can support the management of educational communities’ explicit and tacit knowledge. Thus, we propose a list of essential LORs’ functionalities, which aim to facilitate the organization and sharing of educational communities’ knowledge. Finally, we present the added value of these functionalities by identifying their importance towards addressing the current demands of web-facilitated educational communities, as well as the knowledge management activities that they execute.

  10. Management system, organizational climate and performance relationships

    Science.gov (United States)

    Davis, B. D.

    1979-01-01

    Seven aerospace firms were investigated to determine if a relationship existed among management systems, organizational climate, and organization performance. Positive relationships were found between each of these variables, but a statistically significant relationship existed only between the management system and organizational climate. The direction and amount of communication and the degree of decentralized decision-making, elements of the management system, also had a statistically significant realtionship with organization performance.

  11. A model for international border management systems.

    Energy Technology Data Exchange (ETDEWEB)

    Duggan, Ruth Ann

    2008-09-01

    To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.

  12. Electronic Resources Management System: Recommendation Report 2017

    KAUST Repository

    Ramli, Rindra M.

    2017-05-01

    This recommendation report provides an overview of the selection process for the new Electronic Resources Management System. The library has decided to move away from Innovative Interfaces Millennium ERM module. The library reviewed 3 system as potential replacements namely: Proquest 360 Resource Manager, Ex Libris Alma and Open Source CORAL ERMS. After comparing and trialling the systems, it was decided to go for Proquest 360 Resource Manager.

  13. Towards a holistic customer experience management framework for enterprises

    Directory of Open Access Journals (Sweden)

    De Vries, Marne

    2016-11-01

    Full Text Available We have entered the age of the customer where customer choice is the main differentiator between enterprises. Therefore, enterprises need to shift their focus to customer experience management (CEM. A survey conducted within the telecommunications sector indicated a gap between theoretical CEM approaches and their implementation in enterprises. Although a systematic literature review and inductive thematic analysis of CEM literature revealed nine common themes, none of the existing approaches includes all of these themes in a comprehensive way. Based on those nine themes, this paper presents a new holistic framework for CEM that managers and practitioners concerned with improving customer experiences could use.

  14. Waste Management System Requirement document

    International Nuclear Information System (INIS)

    1990-04-01

    This volume defines the top level technical requirements for the Monitored Retrievable Storage (MRS) facility. It is designed to be used in conjunction with Volume 1, General System Requirements. Volume 3 provides a functional description expanding the requirements allocated to the MRS facility in Volume 1 and, when appropriate, elaborates on requirements by providing associated performance criteria. Volumes 1 and 3 together convey a minimum set of requirements that must be satisfied by the final MRS facility design without unduly constraining individual design efforts. The requirements are derived from the Nuclear Waste Policy Act of 1982 (NWPA), the Nuclear Waste Policy Amendments Act of 1987 (NWPAA), the Environmental Protection Agency's (EPA) Environmental Standards for the Management and Disposal of Spent Nuclear Fuel (40 CFR 191), NRC Licensing Requirements for the Independent Storage of Spent Nuclear and High-Level Radioactive Waste (10 CFR 72), and other federal statutory and regulatory requirements, and major program policy decisions. This document sets forth specific requirements that will be fulfilled. Each subsequent level of the technical document hierarchy will be significantly more detailed and provide further guidance and definition as to how each of these requirements will be implemented in the design. Requirements appearing in Volume 3 are traceable into the MRS Design Requirements Document. Section 2 of this volume provides a functional breakdown for the MRS facility. 1 tab

  15. University Program Management Information System

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  16. Managing geometric information with a data base management system

    Science.gov (United States)

    Dube, R. P.

    1984-01-01

    The strategies for managing computer based geometry are described. The computer model of geometry is the basis for communication, manipulation, and analysis of shape information. The research on integrated programs for aerospace-vehicle design (IPAD) focuses on the use of data base management system (DBMS) technology to manage engineering/manufacturing data. The objectives of IPAD is to develop a computer based engineering complex which automates the storage, management, protection, and retrieval of engineering data. In particular, this facility must manage geometry information as well as associated data. The approach taken on the IPAD project to achieve this objective is discussed. Geometry management in current systems and the approach taken in the early IPAD prototypes are examined.

  17. Social Responsibility as a Management Control System

    National Research Council Canada - National Science Library

    Barger, Anthony

    2004-01-01

    .... Finally, they overlay the model from corporate America onto the Naval Postgraduate School to examine where socially responsible management control systems operate to control and adjust the overall...

  18. Managing Emergent Behavior in Distributed Control Systems

    National Research Council Canada - National Science Library

    Van

    1997-01-01

    ..., and it must be managed accordingly. Drawing on experiences in the Auto Body Consortium's Intelligent Resistance Welding project, we illustrate the potential for this kind of behavior among welding robots in an automotive body shop...

  19. Optimized Experiment Design for Marine Systems Identification

    DEFF Research Database (Denmark)

    Blanke, M.; Knudsen, Morten

    1999-01-01

    Simulation of maneuvring and design of motion controls for marine systems require non-linear mathematical models, which often have more than one-hundred parameters. Model identification is hence an extremely difficult task. This paper discusses experiment design for marine systems identification...... and proposes a sensitivity approach to solve the practical experiment design problem. The applicability of the sensitivity approach is demonstrated on a large non-linear model of surge, sway, roll and yaw of a ship. The use of the method is illustrated for a container-ship where both model and full-scale tests...

  20. Ageing management of nuclear power plant - the Tarapur experience

    International Nuclear Information System (INIS)

    Anilkumar, K.R.; Das, P.K.; Bhattacharjee, S.; Ramamurty, U.

    2006-01-01

    Tarapur Atomic Power Station, the longest serving Nuclear Power Plant in the Asian continent has completed 36 years of successful operation and generated more than 70,000 million units of electric power. Built in late sixties, with the state-of-the-art safety features prevailing then, TAPS through the process of evolution has become safer plant due to efforts of upgradation, renovation and refurbishment prompted by the station's operating experience, feed back from overseas reactors, lessons learnt from nuclear incidents, accidents and fresh review of design basis and safety analysis of the plant. All components of a Nuclear power plant experience some degradation with time. The Reactor Pressure Vessels (RPV) designed for 40 effective full power years (EFPY) of operation have operated for less than 20 EFPY and the material condition is assessed to be fit for some more years of service. The condition of the containment and main plant buildings was assessed to be satisfactory. The Ageing Management Programme (AMP) involved identification of key systems, structures and components (SSCs) that may experience degradation due to ageing, and take corrective measures through maintenance, repair and/or replacement. The identified components were classified as major critical components, important systems and other critical components. For each component mode of degradation was identified, ageing assessment was done and action plan was finalized. Replacement of some important equipment like 3 x 50 % capacity Emergency Diesel Generators (EDG) with 3 x 100 % capacity EDG, Salt Service Water (SSW) pumps, Control rod drive (CRD) pumps, Emergency Condenser tube bundles, Station battery has been done on the basis of condition monitoring and to obviate common cause failure and enhance the system reliability. Samples of Safety related cables were subjected to residual life assessment (RLA) and replacement action firmed up on the basis of the RLA findings. Condition survey of Main

  1. Integrating Agronomic Principles with Management Experience in Introductory Agronomy.

    Science.gov (United States)

    Vorst, J. J.

    1989-01-01

    Explains the use of a cropping systems project to teach agronomic principles and crop management techniques, and to enhance communication skills. Provides a sample progress report instructions sheet which was used for the project. (Author/RT)

  2. Managing your digital life with a Personal information management system

    OpenAIRE

    Abiteboul, Serge; André, Benjamin; Kaplan, Daniel

    2015-01-01

    International audience; Computer wizards already know how to control their personal data to some extent. It is now becoming possible for everyone to do the same, and there are many advantages to doing so. Everyone should now be in a position to manage his/her personal information management system. This is the topic of this paper. To appear in Communications of the ACM

  3. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  4. Information Systems Coordinate Emergency Management

    Science.gov (United States)

    2012-01-01

    -changing planet. This information can be captured, analyzed, and visualized by geographic information systems (GIS) to produce maps, charts, and other tools that can reveal information essential to a wide variety of applications including emergency management. Knowing precise, real-time information about the size, location, environmental conditions, and resulting damage of an event like a flood or wildfire as well as the location and numbers of emergency responders and other resources contributes directly to the effectiveness of disaster mitigation. The need for such information is also evident when responding to homeland security threats, such as a terrorist attack. Recognizing the value of its geospatial information resources for this and other purposes, in 1998 Stennis and the state of Mississippi partnered to form what became the Enterprise for Innovative Geospatial Solutions (EIGS) industry cluster, supporting the growth of remote sensing and GIS-based research and business. As part of EIGS, several companies partnered with NASA through dual use and Small Business Innovation Research (SBIR) contracts. Among those was NVision.

  5. Does identity shape leadership and management practice? Experiences of PHC facility managers in Cape Town, South Africa

    Science.gov (United States)

    Daire, Judith; Gilson, Lucy

    2014-01-01

    In South Africa, as elsewhere, Primary Health Care (PHC) facilities are managed by professional nurses. Little is known about the dimensions and challenges of their job, or what influences their managerial practice. Drawing on leadership and organizational theory, this study explored what the job of being a PHC manager entails, and what factors influence their managerial practice. We specifically considered whether the appointment of professional nurses as facility managers leads to an identity transition, from nurse to manager. The overall intention was to generate ideas about how to support leadership development among PHC facility managers. Adopting case study methodology, the primary researcher facilitated in-depth discussions (about their personal history and managerial experiences) with eight participating facility managers from one geographical area. Other data were collected through in-depth interviews with key informants, document review and researcher field notes/journaling. Analysis involved data triangulation, respondent and peer review and cross-case analysis. The experiences show that the PHC facility manager’s job is dominated by a range of tasks and procedures focused on clinical service management, but is expected to encompass action to address the population and public health needs of the surrounding community. Managing with and through others, and in a complex system, requiring self-management, are critical aspects of the job. A range of personal, professional and contextual factors influence managerial practice, including professional identity. The current largely facility-focused management practice reflects the strong nursing identity of managers and broader organizational influences. However, three of the eight managers appear to self-identify an emerging leadership identity and demonstrate related managerial practices. Nonetheless, there is currently limited support for an identity transition towards leadership in this context. Better

  6. Automated attendance management and alert system | Rahim ...

    African Journals Online (AJOL)

    “Automated Attendance Management and Alert System (AAMAS)” was developed to help UiTM lecturers and Academic Affairs Department in monitoring students' absenteeism and improving the absenteeism record management. AAMAS provides various functions, from managing and recording students' attendance record ...

  7. Efficiency analysis system of material management

    Directory of Open Access Journals (Sweden)

    Bogusław Śliwczyński

    2012-12-01

    Full Text Available Background: Significant scope of enterprise's efficiency management is improving of material management process both the strategic and operational level. The complexity of material flow processes can lead to a threat such as distraction and disintegration of analysis focusing on many different factors influenced on effective sourcing and procurement management, transport and warehousing processes, inventory management, working capital and cash flow management. Material and methods: The presented article focuses on multidimensional and multi-criteria analysis of material management efficiency that is considered as decision support system. Authors have presented results of the research regarding ineffective material management confirm insufficient analytical supporting in various decisions of procurement operations. Results and conclusions: Based on research results authors presented in the article model of efficiency analysis system of material management.

  8. Effective maintenance practices to manage system aging

    Science.gov (United States)

    Chockie, Alan; Bjorkelo, Kenneth

    A study for the Nuclear Regulatory Commission was recently undertaken to identify effective maintenance practices that could be adapted by the nuclear industry in the United States to assist in managing the aging degradation of plant systems and components. Four organizations were examined to assess the influence of maintenance programs on addressing the system and component aging degradation issues. An effective maintenance program was found to be essential to the management of system and component aging. Four key elements of an effective maintenance program that are important to an aging management were identified: (1) the selection of critical systems and components; (2) the development of an understanding of aging through the collection and analysis of equipment performance information; (3) the development of appropriate preventive and predictive maintenance tasks to manage equipment and system aging degradation; and (4) the use of feedback mechanisms to continuously improve the management of aging systems and components. These elements were found to be common to all four organizations.

  9. Managing a major security system installation: Practical lessons learned

    International Nuclear Information System (INIS)

    Roehrig, S.C.

    1986-01-01

    Sandia National Laboratories has been heavily involved for over a decade in aiding a number of DOE facilities in defining and implementing upgraded security safeguards systems. Because security system definition, design, and installation is still a relatively new field to the commercial world, effective project management must pay special attention to first understanding and then interpreting the unique aspects of a security system for all concerned parties. Experiences from an actual security system installation are used to illustrate some project management approaches which have been found to be effective

  10. Design of the plutonium facility for animal experiments and its management experience

    International Nuclear Information System (INIS)

    Koizumi, Akira; Fukuda, Satoshi

    1998-01-01

    Design and radiation control of authors' facility which was made as a nuclear fuel laboratory for animal experiments were described. Before construction, the animals thought to be used were rats, mice, beagle dogs and monkeys. 239 Pu and certain other radioisotopes were to be used. At present, 200 dogs and 1800 small animals can be maintained. The points for design were tolerability against quake, reduced-pressure management and permanent storage of waste containing Pu. The facility building composed from 2nd, 4th, and 6th laboratory floors and between them, from the so-called mechanical floors which are spaces for ducts. The latter floors are quite useful. The system for reduced pressure is of 3 patterns of rooms without hood, with ordinary hood and with air-curtain hood. For animal maintenance, there are 3 types of maintenance means: Glove box, hood and ordinary animal room. There are drainage equipment where Pu can be removed by precipitation and charcoal adsorption and incineration equipment which is necessary for reducing the waste volume. In the latter, HEPA filters are finally used for releasing the gas. There is no particular problem in the radiation control. For the personnel control, lung-monitoring is performed before and at the end of personnel registration. Environmental monitoring of Pu is optionally performed. Removal of Pu particles generated in the inhalation experiments could be attained by the use of ULPA and HEPA filters to the level less than 1/10 17 times the reference level. Keeping the technology level enough high for facility maintenance and management was considered to be important at present and in future. (K.H.)

  11. System safety education focused on system management

    Science.gov (United States)

    Grose, V. L.

    1971-01-01

    System safety is defined and characteristics of the system are outlined. Some of the principle characteristics include role of humans in hazard analysis, clear language for input and output, system interdependence, self containment, and parallel analysis of elements.

  12. Dynamic System Simulation of the KRUSTY Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Klein, Steven Karl [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Kimpland, Robert Herbert [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-05-09

    The proposed KRUSTY experiment is a demonstration of a reactor operating at power. The planned experimental configuration includes a highly enriched uranium (HEU) reflected core, cooled by multiple heat pipes leading to Stirling engines for primary heat rejection. Operating power is expected to be approximately four (4) to five (5) kilowatts with a core temperature above 1,000 K. No data is available on any historical reactor employing HEU metal that operated over the temperature range required for the KRUSTY experiment. Further, no reactor has operated with heat pipes as the primary cooling mechanism. Historic power reactors have employed either natural or forced convection so data on their operation is not directly applicable to the KRUSTY experiment. The primary purpose of the system model once developed and refined by data from these component experiments, will be used to plan the KRUSTY experiment. This planning will include expected behavior of the reactor from start-up, through various transient conditions where cooling begins to become present and effective, and finally establishment of steady-state. In addition, the model can provide indicators of anticipated off-normal events and appropriate operator response to those conditions. This information can be used to develop specific experiment operating procedures and aids to guide the operators in conduct of the experiment.

  13. Pathways, Networks, and Systems: Theory and Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Joseph H. Nadeau; John D. Lambris

    2004-10-30

    The international conference provided a unique opportunity for theoreticians and experimenters to exchange ideas, strategies, problems, challenges, language and opportunities in both formal and informal settings. This dialog is an important step towards developing a deep and effective integration of theory and experiments in studies of systems biology in humans and model organisms.

  14. FANP concept for plant life management and recent experience

    International Nuclear Information System (INIS)

    Nopper, H.; Daeuwel, W.; Waas, U.

    2002-01-01

    The deregulation of the power generation industry has resulted in increased competitive pressure and is forcing operators to improve plant operating economy while maintaining high levels of plant safety. A key factor to meet this challenge is to apply a comprehensive plant life management (PLIM) approach. The PLIM strategy addresses all relevant ageing and degradation mechanisms, the safety concept and the plant component documentation. In addition, it affects the management of plant personnel, consumables, operations management systems and administrative control procedures. Framatome ANP GmbH has developed an integrated PLIM concept and associated software tools applicable for both new and operating plants. The concept includes procedures and strategies regarding mechanical, electrical and I and C components as well as civil structures. The majority of e.g. mechanical components in a well-kept power plant will experience a technical service life, which is far above the intended design life. In most cases, only a small percentage of mechanical components is subject to significant degradation which may effect the integrity or the function of the component. The intention of an effective PLIM concept is to select safety and availability relevant components, were relevant degradation can not be ruled out. The PLIM concept utilizes a combination of strategies to identify components in a power plant: which are relevant to life management. An integrated safety review identifies components essential to safety, providing a classification of the associated safety levels. Assessment concerning the availability relevance of components is conduced. Components identified to be important to safety and availability are subject to a screening process for further grouping with respect to degradation potential. The selection process provides reasonable prioritisation of ageing relevant components and ensures that efforts are devoted to elements, where ageing is a relevant concern

  15. Designing conjoint choice experiments using managers' prior beliefs

    NARCIS (Netherlands)

    Sandor, Z; Wedel, M

    2001-01-01

    The authors provide more efficient designs for conjoint choice experiments based on prior information elicited from managers about the parameters and their associated uncertainty. The authors use a Bayesian design procedure that assumes a prior distribution of likely parameter values and optimizes

  16. A Necessary Evil: The Experiences of Managers Implementing Downsizing Programmes

    Science.gov (United States)

    Noronha, Ernesto; D'Cruz, Premilla

    2006-01-01

    This paper presents the findings of a phenomenological study, which describes the experiences of human resource (HR) managers implementing a downsizing program in a steel manufacturing organization in India. Data were collected through conversational interviews. Following van Manens sententious analytic approach, the core theme of a necessary…

  17. Learning by Blundering Around Some Experiences in International Management

    OpenAIRE

    Singh J P

    1994-01-01

    Based upon the experiences of American Companies operating abroad the paper focuses on the issue of learning in management. It shows that costly mistakes can be avoided by looking at the blunders committed by others. It also aims at generating information about similar cases in India.

  18. Experience in the management of the mass casualty from the ...

    African Journals Online (AJOL)

    2015-09-21

    Sep 21, 2015 ... Background: On the 17 of January 2010, a sectarian crisis broke out in Jos the capital of Plateau state, Nigeria. It created a mass casualty situation in the Jos University Teaching Hospital. We present the result of the hospital management of that mass casualty incident. Objective: To share our experience in ...

  19. Management of necrotizing enterocolitis: experience at a tertiary ...

    African Journals Online (AJOL)

    Management of necrotizing enterocolitis: experience at a tertiary care hospital in Oman. Kirtikumar J. Rathod a. , Asfaq A. Khan b. , Mathew Kripail b. , Muhammad Fazallulah b. ,. Zainab Al Balushi a and Mohamed Abdellatif b. Introduction Necrotizing enterocolitis (NEC) is the most common surgical emergency in the ...

  20. Myths, experiences and home management of childhood diarrhea ...

    African Journals Online (AJOL)

    Background: Diarrhea is a major threat to child survival due to its devastating complication of dehydration. Several home remedies inclusive of oral rehydration therapy have benefited many people. This study assessed nursing mothers' knowledge and experiences of home management of childhood diarrhea. Methodology: ...