WorldWideScience

Sample records for experience upgraded mpc

  1. OPERATIONAL EXPERIENCE: UPGRADED MPC AND A SYSTEMS FOR THE RADIOCHEMICAL PLANT OF THE SIBERIAN CHEMICAL COMBINE

    International Nuclear Information System (INIS)

    RODRIGUEZ, C.; GOLOSKOKOV, I.; FISHBONE, L.; GOODEY, K.; LOOMIS, M.; CRAIN, B. JR.; LARSEN, R.

    2003-01-01

    inventory procedures, and destructive and nondestructive assay equipment to perform neutron and gamma measurements on nuclear materials in process or storage. These MPC and A upgrades have been in operation at the SCC Radiochemical Plant for between 2 and 3 years. The operational experience gained by SCC during this period is currently being evaluated by SCC and ''lessons learned'' will be considered both for continued operation of the Radiochemical Plant MPC and A systems and similar MPC and A systems that are currently being planned for other Plant Sites of the SCC

  2. Progress in MPC and A upgrades at Luch

    International Nuclear Information System (INIS)

    Mizin, P.; Chukov, V.; Rogatchev, V.; Curtiss, J.; Erkkila, B.; Goodey, K.; Hembree, D. Jr.; Lowe, D.; Turner, C.

    1997-01-01

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch

  3. MPC and A upgrades at the Institute of Theoretical and Experimental Physics (ITEP)

    International Nuclear Information System (INIS)

    Haase, M.; Smarto, C.; Baumann, M.

    1998-01-01

    Materials Protection, Control and Accounting (MPC and A) equipment upgrades are complete at the Institute of Theoretical and Experimental Physics (ITEP), a site that has significant quantities of weapons-potential nuclear materials. Cooperative work was initiated at this Moscow facility as a part of the US-Russian program to upgrade MPC and A systems. An initial site visit and assessment were conducted in September 1996 to establish communication between ITEP, the US Department of Energy (DOE), and participating US National Laboratories. Subsequently, an agreement was reached to develop two master plans for MPC and A upgrades. Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) assisted in developing a plan for Material Control and Accounting (MC and A) upgrades, and Sandia National Laboratories (SNL) assisted in developing a plan for Physical Protection System (PPS) upgrades. The MC and A plan included MC and A training, a mass measurement program, nondestructive assay instrumentation, item identification (bar coding), physical inventory taking, portal and hand-held nuclear material monitors, and a nuclear materials accounting system. The PPS plan included basic PPS design training, Central Alarm Station (CAS) relocation and equipment upgrades, a site and critical-building access control system, intrusion detection, alarm assessment, and guard force communications

  4. Developing indigenous safeguards capabilities within the MPC ampersand A program: A transition from near-term upgrades to long-term sustainability

    International Nuclear Information System (INIS)

    Robinson, P.W.; Leutters, F.O.; Horton, R.D.; Soo Hoo, M.S.

    1997-01-01

    Approximately five years ago, the United States and countries of ampersand Former Soviet Union (FSU) started the Cooperative Threat Reduction program. The program's purpose was to accelerate reduction of the risk of nuclear proliferation, including such threats as theft, diversion, and unauthorized possession of nuclear materials. This goal would be accomplished through near-term upgrades to strengthen the nuclear material protection, control, and accounting systems within the FSU countries. In addition to this near-term goal, a long-term goal of the U.S. Department of Energy's (DOE) Material Protection, Control, and Accounting (MPC ampersand A) program is to promote a new safeguards culture and to support the establishment of a sustaining MPC ampersand A infrastructure in the FSU. This long-term goal is vital to assuring that the near-term upgrades remain effective for safeguarding nuclear material as these countries experience political and social changes. The MPC ampersand A program is managed by DOE's Russia/Newly Independent States (NIS) Nuclear Materials Security Task Force. A coordinated effort is underway to promote and to help establish a new safeguards culture and a sustaining infrastructure. Elements being implemented at both the national and site levels include system operational performance evaluations, development of MPC ampersand A training, operational procedures, national MPC ampersand A regulations, and adaptation of modern MPC ampersand A methodologies to suit the conditions in the FSU countries. This paper identifies current efforts in several countries that are undergoing transition from near-term upgrades to sustainable MPC ampersand A systems

  5. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saraev, O.; Haase, M.; Smarto, C.; Mikkelsen, K.; Heinberg, C.; Showalter, R.; Soo Hoo, M.; Hatcher, C.; Forehand, M.

    1998-01-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers

  6. Development of Regulatory Documents for Creation (Upgrade) of Physical Protection Systems under the Russian/American MPC and A Program

    International Nuclear Information System (INIS)

    Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy; Piskarev, Alexander; O'Brien, Patricia E.; Wright, Troy L.; Schlegel, Stephen C.; Hazel, Michael J.; Miller, Daniel R.; Tuttle, John D.; Kovchegin, Dmitry

    2009-01-01

    The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under their control. This regulatory development has been accomplished as part of the U.S.-Russian MPC and A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC and A regulations.

  7. Exploring forward physics with the PHENIX MPC-EX upgrade

    Science.gov (United States)

    Novitzky, Norbert; Phenix Collaboration

    2014-09-01

    The MPC-EX detector is a Si-W preshower extension to the existing Muon Piston Calorimeter (MPC) at PHENIX. Located at forward rapidity, 3 . 1 double showers. The single versus double shower separation was tested with an electron beam at the SLAC test beam facility. Results from the test beam data will be presented in this talk. The MPC-EX detector is a Si-W preshower extension to the existing Muon Piston Calorimeter (MPC) at PHENIX. Located at forward rapidity, 3 . 1 double showers. The single versus double shower separation was tested with an electron beam at the SLAC test beam facility. Results from the test beam data will be presented in this talk. Norbert Novitzky for PHENIX collaboration.

  8. Material Protection, Control, and Accountancy (MPC and A) Sustainability

    International Nuclear Information System (INIS)

    Baumann, Mark; Farmer, James; Haase, Michael; Mann, Greg; Soo Hoo, Mark; Toth, William

    1999-01-01

    To date, the Department of Energy's (DOE) Material Protection, Control, and Accountancy (MPC and A) program has assisted in the implementation of operational site-wide MPC and A systems at several nuclear facilities in Russia. Eleven sites from the civilian sector have completed the site-wide installations and two have completed sub-site installations. By the end of 1999, several additional sites will have completed site-wide and sub-site system installations through DOE assistance. the effort at the completed sites has focused primarily on the design, integration, and installation of upgraded MPC and A systems. In most cases, little work has been performed to ensure that the installed systems will be sustained. Because of concerns that the installed systems would not be operated in the future, DOE established a sustainability pilot program involving the 11 sites. The purpose of DOE's MPC and A Sustainability Program is to ensure that MPC and A upgrades installed at sites in Russia are effective and will continue to operate over the long term. The program mission is to work with sites where rapid upgrades have been completed to cultivate enduring and consistent MPC and A practices. The program attempts to assist the Russian sites to develop MPC and A organizations that will operate, maintain, and continue to improve the systems and procedures. Future assistance will strive to understand and incorporate culturally sensitive approaches so that the sites take ownership for all MPC and A matters. This paper describes the efforts of the sustainability program to date

  9. New Directions for MPC and A at Chelyabinsk-70

    International Nuclear Information System (INIS)

    Tsygankov, G.; Churikov, Y.; Bukin, D.; Karpov, A.; Zuev, V.; Blasy, J.; Labiak, B.; Hernandez, J.; Apt, K.; Schultz, F.; Neymotin, L.; Ystesund, K.; Griggs, J.; Cahalane, P.

    2000-01-01

    This paper describes the new directions for the Nuclear Materials Protection, Control, and Accounting (MPC and A) program at the All Russian Scientific Research Institute of Technical Physics (VNIITF), also called Chelyabinsk-70. Chelyabinsk-70 is located in the Ural Mountains, approximately 2000 km east of Moscow and 100 km south of Ekaterinburg. US sponsored MPC and A work has been underway at VNIITF since mid 1995. During the first three years of the VNIITF project, emphasis was on the Pulse Research Reactor Facility (PRR), which contains one metal and two liquid pulse reactors and associated nuclear material storage rooms and a control center. A commissioning of the PRR was held in May of 1998. With the completion of the MPC and A work in the PRR, new physical protection work has focused on building 726, which contains a pulse reactor and a criticality facility. Physical protection work is now complete at building 726. Several changes in the direction of MPC and A work at VNIITF have taken place and others are underway as a result of new DOE Guidelines for MPC and A at Russian Facilities, the National Research Council report issued in late 1999 and other recommendations. A major change is to do MPC and A work only at facilities for which the US can assure the proper categorization of nuclear materials, that upgrades are appropriate, properly installed and operational and that the equipment and funds used to implement and support those upgrades are being utilized in the manner intended. Other changes in direction which will be described include, an increased emphasis on completing inventories, the use of ''inherently sustainable'' upgrades wherever possible, and completing improved accounting systems and other MPC and A upgrades on a prioritized facility by facility basis rather than attempting to implement them site wide

  10. Russian Navy Fresh Fuel MPC and A Training

    International Nuclear Information System (INIS)

    Forehand, Harry M.; O'Shell, Parker; Opanassiouk, Yuri R.; Rexroth, Paul E.; Shmelev, Vladimir; Sukhoruchkin, Vladimir K.

    1999-01-01

    The goal of the Russian Navy Fuels Program is to incorporate nuclear fuel that is in the custody of the Russian Navy into a materials protection, control and accounting program. In addition to applying MPC and A upgrades to existing facilities, a program is underway to train site personnel in MPC and A activities. The goal is to assure that the upgraded facilities are managed, operated and maintained in an effective, sustainable manner. Training includes both the conceptual and necessary operational aspects of the systems and equipment. The project began with a Needs Assessment to identify priorities and objectives of required training. This led to the creation of a series of classes developed by Kurchatov Institute. One course was developed to allow attendees to get a general understanding of goals and objectives of nuclear MPC and A systems in the context of the Russian Navy. A follow-on course provided the detailed skills necessary for the performance of specialized duties. Parallel sessions with hands-on exercises provided the specific training needed for different personnel requirements. The courses were presented at KI facilities in Moscow. This paper reviews the work to date and future plans for this program

  11. Upgrade of the CSC Endcap Muon Port Card at CMS

    International Nuclear Information System (INIS)

    Matveev, M; Padley, P

    2010-01-01

    The Muon Port Card (MPC) provides optical transmission of Level 1 Trigger primitives from 60 Endcap peripheral crates to the Track Finder (TF) crate within the CMS Cathode Strip Chamber (CSC) sub-detector at the CMS experiment at CERN. The system has been in operation since 2008 and comprises 180 1.6 Gbps optical links. The proposed Super-LHC (SLHC) upgrade implies higher data volumes to be transmitted through the trigger chain and more sophisticated trigger algorithms. We expect to upgrade the MPC boards within the next few years to accommodate these requirements. The paper presents the first results of simulation and prototyping with the goal of improving the sorting algorithms and using parallel 12-channel optical links and a more powerful Virtex-5 FPGA.

  12. Russian Navy fresh fuel MPC and A training and regulations

    International Nuclear Information System (INIS)

    Forehand, H.M.; Rexroth, P.; Dove, A.; Shmelev, V.; Sukhoruchkin, V.; Roumiantsev, A.

    1998-01-01

    The Regulations and Training Projects are part of the US-Russian Federation Materials Protection, Control, and Accounting (MPC ampersand A) cooperative program to protect Russian Navy Fuels. This paper describes the general status of the projects, progress achieved to date, and long-term plans for further work in producing regulatory documents and training to support this effort. The regulatory development will result in a document set that will include general requirements and rules for the Russian Navy MPC ampersand A as well as specific instructions for operation and maintenance of each facility. The goals of the training program are to instill in managers a culture of sustainable commitment to MPC ampersand A through the understanding of its principles and philosophies. In addition, the training program will help ensure that upgrades are effectively utilized and maintained by training operators and maintenance personnel in MPC ampersand A principles as well in as the detailed operations of the systems

  13. Commissioning of the upgraded CSC Endcap Muon Port Cards at CMS

    International Nuclear Information System (INIS)

    Ecklund, K.; Liu, J.; Matveev, M.; Michlin, B.; Padley, P.; Rorie, J.; Madorsky, A.

    2016-01-01

    There are 180 1.6 Gbps optical links from 60 Muon Port Cards (MPC) to the Cathode Strip Chamber Track Finder (CSCTF) in the original system. Before the upgrade each MPC was able to provide up to three trigger primitives from a cluster of nine CSC chambers to the Level 1 CSCTF. With an LHC luminosity increase to 10 35 cm −2 s −1 at full energy of 7 TeV/beam, the simulation studies suggest that we can expect two or three times more trigger primitives per bunch crossing from the front-end electronics. To comply with this requirement, the MPC, CSCTF, and optical cables need to be upgraded. The upgraded MPC allows transmission of up to 18 trigger primitives from the peripheral crate. This feature would allow searches for physics signatures of muon jets that require more trigger primitives per trigger sector. At the same time, it is very desirable to preserve all the old optical links for compatibility with the older Track Finder during transition period at the beginning of Run 2. Installation of the upgraded MPC boards and the new optical cables has been completed at the CMS detector in the summer of 2014. We describe the final design of the new MPC mezzanine FPGA, its firmware, and results of tests in laboratory and in situ with the old and new CSCTF boards

  14. Upgrade of the cathode strip chamber level 1 trigger optical links at CMS

    International Nuclear Information System (INIS)

    Ecklund, K; Liu, J; Matveev, M; Padley, P; Madorsky, A

    2012-01-01

    At the Large Hadron Collider (LHC) at CERN, the CMS experiment's Level 1 Trigger system for the endcap Cathode Strip Chambers (CSC) has 180 optical links to transmit Level 1 trigger primitives from 60 peripheral crates to the CSC Track Finder (CSCTF) which reconstructs muon candidates. Currently there is a limit of 3 trigger primitives per crate serving a cluster of 9 chambers. With the anticipated LHC luminosity increase up to 10 35 cm −2 s −1 at full energy of 7 TeV/beam the Muon Port Card (MPC), which transmits the primitives, the receiver in the CSCTF (Sector Processor) and the optical transmission system itself need to be upgraded. At the same time it is very desirable to preserve all the old optical links intact for compatibility with the present Track Finder during transition period. We present here the results of our efforts in the past two years to upgrade the MPC board, including the hardware developments, data transmission tests and latency measurements.

  15. Nuclear materials control and accountability criteria for upgrades measures

    International Nuclear Information System (INIS)

    Erkkila, B.H.; Hatcher, C.R.

    1998-01-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force

  16. Nuclear materials control and accountability criteria for upgrades measures

    Energy Technology Data Exchange (ETDEWEB)

    Erkkila, B.H.; Hatcher, C.R.

    1998-11-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

  17. Studying Cold Nuclear Matter with the MPC-EX of PHENIX

    Science.gov (United States)

    Grau, Nathan; Phenix Collaboration

    2017-09-01

    Highly asymmetric collision systems, such as d+Au, provide a unique environment to study cold nuclear matter. Potential measurements range from pinning down the modification of the nuclear wave function, i.e. saturation, to studying final state interactions, i.e. energy loss. The PHENIX experiment has enhanced the muon piston calorimeter (MPC) with a silicon-tungsten preshower, the MPC-EX. With its fine segmentation the MPC-EX extends the photon detection capability at 3 < | η | < 3.8. In this talk we review the current status of the detector, its calibration, and its identification capabilities using the 2016 d+Au dataset. We also discuss the specific physics observables the MPC-EX can measure.

  18. The MPC and A Questionnaire

    International Nuclear Information System (INIS)

    Powell, Danny H.; Elwood, Robert H. Jr.

    2011-01-01

    The questionnaire is the instrument used for recording performance data on the nuclear material protection, control, and accountability (MPC and A) system at a nuclear facility. The performance information provides a basis for evaluating the effectiveness of the MPC and A system. The goal for the questionnaire is to provide an accurate representation of the performance of the MPC and A system as it currently exists in the facility. Performance grades for all basic MPC and A functions should realistically reflect the actual level of performance at the time the survey is conducted. The questionnaire was developed after testing and benchmarking the material control and accountability (MC and A) system effectiveness tool (MSET) in the United States. The benchmarking exercise at the Idaho National Laboratory (INL) proved extremely valuable for improving the content and quality of the early versions of the questionnaire. Members of the INL benchmark team identified many areas of the questionnaire where questions should be clarified and areas where additional questions should be incorporated. The questionnaire addresses all elements of the MC and A system. Specific parts pertain to the foundation for the facility's overall MPC and A system, and other parts pertain to the specific functions of the operational MPC and A system. The questionnaire includes performance metrics for each of the basic functions or tasks performed in the operational MPC and A system. All of those basic functions or tasks are represented as basic events in the MPC and A fault tree. Performance metrics are to be used during completion of the questionnaire to report what is actually being done in relation to what should be done in the performance of MPC and A functions.

  19. Upgrading nuclear material protection, control and accounting in Russia

    International Nuclear Information System (INIS)

    Caravelli, Jack; Behan, Chris; Fishbone, Les

    2001-01-01

    Full text: I. Program goal and organization - In this paper we review the Cooperative US-Russia Program of Nuclear Material Protection, Control and Accounting (MPC and A), whose goal is to reduce the risk of nuclear weapons proliferation by strengthening systems of MPC and A; thereby the Program enhances US national security. Based on this goal, the technical objective is to enhance, through US technical cooperation, the effectiveness of MPC and A systems at Russian sites with weapons-usable nuclear material, i.e. plutonium and highly enriched uranium. The Program exists because the extensive social, political and economic changes in Russia arising from the dissolution of the Soviet Union have increased the risk that these materials would be subject to theft or other misuse, with potentially grave consequences. On the US side, the MPC and A Program is administered by the US Department of Energy (DOE) National Nuclear Security Administration through the DOE national laboratories and other contractors. On the Russian side, the Program is administered by the Russian Ministry of Atomic Energy (Minatom) through its nuclear sites, by the regulatory agency Gosatomnadzor, and by nuclear sites not under Minatom. To carry out the Program objective, the DOE national laboratories consummate contracts with the Russian sites to implement agreed MPC and A upgrades. Deciding on what upgrades to perform depends on a cooperative analysis of site characteristics, materials, and vulnerabilities by joint US and Russian teams. Once the upgrades are agreed, the DOE laboratories supply technical and financial support and equipment to the Russian sites. The staff of the Russian sites do the work, and the US team members monitor the work through some combination - according to contract - of direct observation and reports, photographs and videotape supplied by the staff of the Russian sites. II. MPC and A task areas - Information in this review covers a selection of topical areas, with a

  20. The Ural Electrochemical Integrated Plant Process for Managing Equipment Intended for Nuclear Material Protection, Control and Accounting System Upgrades

    International Nuclear Information System (INIS)

    Yuldashev, Rashid; Nosov, Andrei; Carroll, Michael F.; Garrett, Albert G.; Dabbs, Richard D.; Ku, Esther M.

    2008-01-01

    Since 1996, the Ural Electrochemical Integrated Plant (UEIP) located in the town of Novouralsk, Russia, (previously known as Sverdlovsk-44) and the United States Department of Energy (U.S. DOE) have been cooperating under the Nuclear Material Protection, Control and Accounting (MPC and A) Program. Because UEIP is involved in the processing of highly enriched uranium (HEU) into low enriched uranium (LEU), and there are highly enriched nuclear materials on its territory, the main goal of the MPC and A cooperation is to upgrade those systems that ensure secure storage, processing and transportation of nuclear materials at the plant. UEIP has completed key upgrades (equipment procurement and installation) aimed at improving MPC and A systems through significant investments made by both the U.S. DOE and UEIP. These joint cooperative efforts resulted in bringing MPC and A systems into compliance with current regulations, which led to nuclear material (NM) theft risk reduction and prevention from other unlawful actions with respect to them. Upon the U.S. MPC and A project team's suggestion, UEIP has developed an equipment inventory control process to track all the property provided through the MPC and A Program. The UEIP process and system for managing equipment provides many benefits including: greater ease and efficiency in determining the quantities, location, maintenance and repair schedule for equipment; greater assurance that MPC and A equipment is in continued satisfactory operation; and improved control in the development of a site sustainability program. While emphasizing UEIP's equipment inventory control processes, this paper will present process requirements and a methodology that may have practical and helpful applications at other sites.

  1. Status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostic system

    International Nuclear Information System (INIS)

    Coutts, G.W.; Coffield, F.E.; Hornady, R.S.

    1983-01-01

    This paper presents the current status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostics system. For the initial instruments active on TMX-U, the expansions or upgrades that have been implemented are outlined. For the newly added systems, more implementation details are presented

  2. Expected performance of the upgrade ATLAS experiment for HL-LHC

    CERN Document Server

    Liu, Peilian; The ATLAS collaboration

    2018-01-01

    The Large Hadron Collider (LHC) has been successfully delivering proton-proton collision data at the unprecedented center of mass energy of 13 TeV. An upgrade is planned to increase the instantaneous luminosity delivered by the LHC in what is called the HL-LHC, aiming to deliver a total of up 3000/fb to 4000/fb of data per experiment. To cope with the expected data-taking conditions ATLAS is planning major upgrades of the detector. It is now a critical time for these upgrade projects and during the last year and a half, six Technical Design Reports (TDR) were produced by the ATLAS Collaboration. In these TDRs the physics motivation and benefits of such upgrades are discussed together with details on the upgrade project itself. In this contribution we review the expected performance of the upgraded ATLAS detector and the expected reach for physics measurements as well as the discovery potential for new physics that is expected by the end of the HL-LHC data-taking. The performance of object reconstruction under...

  3. Testing a Constrained MPC Controller in a Process Control Laboratory

    Science.gov (United States)

    Ricardez-Sandoval, Luis A.; Blankespoor, Wesley; Budman, Hector M.

    2010-01-01

    This paper describes an experiment performed by the fourth year chemical engineering students in the process control laboratory at the University of Waterloo. The objective of this experiment is to test the capabilities of a constrained Model Predictive Controller (MPC) to control the operation of a Double Pipe Heat Exchanger (DPHE) in real time.…

  4. Control of boiler temperature with explicit MPC; Panntemperaturreglering med explicit MPC

    Energy Technology Data Exchange (ETDEWEB)

    Slaetteke, Ola; Velut, Stefan; Raaberg, Martin

    2012-02-15

    MPC is the multivariable controller that has been most successful in the process industry and particularly the petrochemical industry. It has been described as one of the most significant developments in process control and the main reasons for this are: 1. It handles multivariable control problems in a natural manner. 2. It is relative easy to understand the structure of the controller, which is the same whether it is a simple loop or a multivariable system. 3. It handles limitations of both the process and other practical constraints in a systematic way. Examples of this is that a valve can only work between 0 and 100 %, but also that the CO-level in the flue gas must not exceed a certain level. 4. It allows for operating conditions near critical process boundaries, which in many cases is synonymous with increased production rates, reduced raw material consumption, better energy utilization, and faster process transitions. The aim of the project is to evaluate the potential of multivariable control in the form of explicit MPC in a boiler at Stora Enso Hylte Bruk. This research task can be divided into two sub-tasks: 1. General evaluation of explicit MPC. 2. Evaluation of multivariable control of boiler temperature The purpose of subtask one is to evaluate what is required of a facility owner to implement explicit MPC in a control system. This includes everything from available calculation tools, what is important to consider during the design phase of the controller, different pitfalls that exist, management of different operating modes, to how the controller should be implemented and commissioned. Subtask two is intended to evaluate the multivariable control of a boiler of CFB type (circulating fluidized bed). MPC controller will regulate the temperature in the boiler. In order to maintain the waste incineration directive, the temperature in the upper part of the boiler is controlled. This is done by means of changes in the flow of natural gas injection and

  5. Implementation of U.S. Department of Energy physical protection upgrades in Lithuania and Uzbekistan

    International Nuclear Information System (INIS)

    Haase, M.; Romesberg, L.; Showalter, R.; Soo Hoo, M.S.; Corey, J.; Engling, E.

    1996-01-01

    Since 1994, the U.S. Department of Energy (DOE) has provided cooperative assistance to the non-nuclear weapons states of the Former Soviet Union. This effort, within DOE's program of Material Protection, Control, and Accounting (MPC ampersand A), identified the Institute of Nuclear Physics (INP) in Uzbekistan and the Ignalina Nuclear Power Plant (INPP) in Lithuania as sites for cooperative MPC ampersand A projects. The INP, located just outside of Tashkent, is the site of a 10-megawatt WWR-SM research reactor. This reactor is expected to remain operational as a major nuclear research and isotope production reactor for Central Asia. The INPP, located 100 kilometers northeast of the capital city of Vilnius, consists of two Russian-made RBMK reactors with a combined power output of 3,000 megawatts (electric). This power plant has been the subject of international safety and security concerns, which prompted DOE's cooperative assistance effort. This paper describes U.S. progress in a multi-national effort directed at implementing physical protection upgrades in Lithuania and Uzbekistan. The upgrades agreed upon between DOE and the INP and between DOE and the INPP have been designed to interface with upgrades being implemented by other donor countries. DOE/INPP upgrade projects include providing training on U.S. approaches to physical protection, access control through the main vehicle portal, a hardened central alarm station, and improved guard force communications. DOE/INP upgrade projects in Uzbekistan include an access control system, a hardened fresh fuel storage vault, an interior intrusion detection and assessment system, and an integrated alarm display and assessment system

  6. TMX-U [Tandem Mirror Experiment-Upgrade] tandem-mirror thermal-barrier experiments

    International Nuclear Information System (INIS)

    Simonen, T.C.; Allen, S.L.; Baldwin, D.E.

    1986-01-01

    Thermal-barrier experiments have been carried out in the Tandem Mirror Experiment-Upgrade (TMX-U). Measurements of nonambipolar and ambipolar radial transport show that these transport processes, as well as end losses, can be controlled at modest densities and durations. Central-cell heating methods using ion-cyclotron heating (ICH) and neutral-beam injection have been demonstrated. Potential mesurements with recently developed methods indicate that deep thermal barriers can be established

  7. Establishment of mitochondrial pyruvate carrier 1 (MPC1) gene knockout mice with preliminary gene function analyses

    Science.gov (United States)

    Li, Xiaoli; Li, Yaqing; Han, Gaoyang; Li, Xiaoran; Ji, Yasai; Fan, Zhirui; Zhong, Yali; Cao, Jing; Zhao, Jing; Mariusz, Goscinski; Zhang, Mingzhi; Wen, Jianguo; Nesland, Jahn M.; Suo, Zhenhe

    2016-01-01

    Pyruvate plays a critical role in the mitochondrial tricarboxylic acid (TCA) cycle, and it is the center product for the synthesis of amino acids, carbohydrates and fatty acids. Pyruvate transported across the inner mitochondrial membrane appears to be essential in anabolic and catabolic intermediary metabolism. The mitochondrial pyruvate carrier (MPC) mounted in the inner membrane of mitochondria serves as the channel to facilitate pyruvate permeating. In mammals, the MPC is formed by two paralogous subunits, MPC1 and MPC2. It is known that complete ablation of MPC2 in mice causes death on the 11th or 12th day of the embryonic period. However, MPC1 deletion and the knowledge of gene function in vivo are lacking. Using the new technology of gene manipulation known as Clustered Regularly Interspaced Short Palindromic Repeats/CRISPR-associated 9 (CRISPR/Cas9) systems, we gained stable MPC1 gene heterozygous mutation mice models, and the heterozygous mutations could be stably maintained in their offsprings. Only one line with homozygous 27 bases deletion in the first exon was established, but no offsprings could be obtained after four months of mating experiments, indicating infertility of the mice with such homozygous deletion. The other line of MPC1 knockout (KO) mice was only heterozygous, which mutated in the first exon with a terminator shortly afterwards. These two lines of MPC1 KO mice showed lower fertility and significantly higher bodyweight in the females. We concluded that heterozygous MPC1 KO weakens fertility and influences the metabolism of glucose and fatty acid and bodyweight in mice. PMID:27835892

  8. Proposal to upgrade the MIPP experiment

    Energy Technology Data Exchange (ETDEWEB)

    Isenhower, D.; Sadler, M.; Towell, R.; Watson, S. [Abilene Christian Univ., TX (United States); Peterson, R. J. [Univ. of Colorado, Boulder, CO (United States); Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gutbrod, H.; Peters, K. [GSI-Darmstadt (Germany); Feldman, G. [Harvard Univ., Cambridge, MA (United States); Torun, Y. [Illinois Inst. of Technology, Chicago, IL (United States); Messier, M. D.; Paley, J. [Indiana Univ., Bloomington, IN (United States)

    2006-09-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

  9. The independent review group's comments on the MPC

    International Nuclear Information System (INIS)

    Vincent, J.A.

    1994-01-01

    This article presents comments from the Group (IRG) who independently reviewed the multipurpose canister system (MCS) Conceptual Design Report. The IRG determined that its efforts would be best directed toward providing the DOE with recommendations concerning the MPC system design and development. Comments also focused on applying lessons learned during the CSDP review to the MPC design and procurement. Topics highlighted are the programmatic review and the MPC design review

  10. Upgrade of the ALICE Experiment: Letter of Intent

    CERN Document Server

    Abelev, B; Adamová, D; Aggarwal, M M; Aglieri Rinella, G; Agnello, M; Agostinelli, A; Agrawal, N; Ahammed, Z; Ahmad, N; Ahmad Masoodi, A; Ahmed, I; Ahn, S U; Ahn, S A; Aimo, I; Aiola, S; Ajaz, M; Akindinov, A; Aleksandrov, D; Alessandro, B; Alexandre, D; Alici, A; Alkin, A; Alme, J; Alt, T; Altini, V; Altinpinar, S; Altsybeev, I; Alves Garcia Prado, C; Anderssen, E C; Andrei, C; Andronic, A; Anguelov, V; Anielski, J; Anticic, T; Antinori, F; Antonioli, P; Aphecetche, L; Appelshäuser, H; Arbor, N; Arcelli, S; Armesto, N; Arnaldi, R; Aronsson, T; Arsene, I C; Arslandok, M; Augustinus, A; Averbeck, R; Awes, T C; Azmi, M D; Bach, M; Badalà, A; Baek, Y W; Bagnasco, S; Bailhache, R; Bairathi, V; Bala, R; Baldisseri, A; Baltasar Dos Santos Pedrosa, F; Bán, J; Baral, R C; Barbera, R; Barile, F; Barnaföldi, G G; Barnby, L S; Barret, V; Bartke, J; Basile, M; Bastian Van Beelen, J; Bastid, N; Basu, S; Bathen, B; Batigne, G; Battistin, M; Batyunya, B; Batzing, P C; Baudot, J; Baumann, C; Bearden, I G; Beck, H; Bedda, C; Behera, N K; Belikov, I; Bellini, F; Bellwied, R; Belmont-Moreno, E; Bencedi, G; Benettoni, M; Benotto, F; Beole, S; Berceanu, I; Bercuci, A; Berdnikov, Y; Berenyi, D; Berger, M E; Bertens, R A; Berzano, D; Besson, A; Betev, L; Bhasin, A; Bhati, A K; Bhatti, A; Bhattacharjee, B; Bhom, J; Bianchi, L; Bianchi, N; Bianchin, C; Bielcík, J; Bielcíková, J; Bilandzic, A; Bjelogrlic, S; Blanco, F; Blau, D; Blume, C; Bock, F; Boehmer, F V; Bogdanov, A; Boggild, H; Bogolyubsky, M; Boldizsár, L; Bombara, M; Book, J; Borel, H; Borissov, A; Bornschein, J; Borshchov, V N; Bortolin, C; Bossú, F; Botje, M; Botta, E; Böttger, S; Braun-Munzinger, P; Breitner, T; Broker, T A; Browning, T A; Broz, M; Bruna, E; Bruno, G E; Budnikov, D; Buesching, H; Bufalino, S; Buncic, P; Busch, O; Buthelezi, Z; Caffarri, D; Cai, X; Caines, H; Caliva, A; Calvo Villar, E; Camerini, P; Canoa Roman, V; Carena, F; Carena, W; Cariola, P; Carminati, F; Casanova Díaz, A; Castillo Castellanos, J; Casula, E A R; Catanescu, V; Caudron, T; Cavicchioli, C; Ceballos Sanchez, C; Cepila, J; Cerello, P; Chang, B; Chapeland, S; Charvet, J L; Chattopadhyay, S; Chattopadhyay, S; Cherney, M; Cheshkov, C; Cheynis, B; Chibante Barroso, V; Chinellato, D D; Chochula, P; Chojnacki, M; Choudhury, S; Christakoglou, P; Christensen, C H; Christiansen, P; Chujo, T; Chung, S U; Cicalo, C; Cifarelli, L; Cindolo, F; Claus, G; Cleymans, J; Colamaria, F; Colella, D; Coli, S; Colledani, C; Collu, A; Colocci, M; Conesa Balbastre, G; Conesa del Valle, Z; Connors, M E; Contin, G; Contreras, J G; Cormier, T M; Corrales Morales, Y; Cortese, P; Cortés Maldonado, I; Cosentino, M R; Costa, F; Crochet, P; Cruz Albino, R; Cuautle, E; Cunqueiro, L; Dainese, A; Dang, R; Danu, A; Da Riva, E; Das, D; Das, I; Das, K; Das, S; Dash, A; Dash, S; De, S; Decosse, C; Delagrange, H; Deloff, A; Dénes, E; D'Erasmo, G; de Barros, G O V; De Caro, A; de Cataldo, G; de Cuveland, J; De Falco, A; De Gruttola, D; De Marco, N; De Pasquale, S; De Robertis, G; De Roo, K; de Rooij, R; Diaz Corchero, M A; Dietel, T; Divià, R; Di Bari, D; Di Liberto, S; Di Mauro, A; Di Nezza, P; Djuvsland, o; Dobrin, A; Dobrowolski, T; Domenicis Gimenez, D; Dönigus, B; Dordic, O; Dorheim, S; Dorokhov, A; Doziere, G; Dubey, A K; Dubla, A; Ducroux, L; Dulinski, W; Dupieux, P; Dutta Majumdar, A K; Ehlers III, R J; Elia, D; Engel, H; Erazmus, B; Erdal, H A; Eschweiler, D; Espagnon, B; Estienne, M; Esumi, S; Evans, D; Evdokimov, S; Eyyubova, G; Fabris, D; Faivre, J; Falchieri, D; Fantoni, A; Fasel, M; Fehlker, D; Feldkamp, L; Felea, D; Feliciello, A; Feofilov, G; Ferencei, J; Fernández Téllez, A; Ferreiro, E G; Ferretti, A; Festanti, A; Figiel, J; Figueredo, M A S; Filchagin, S; Finogeev, D; Fionda, F M; Fiore, E M; Fiorenza, G; Floratos, E; Floris, M; Foertsch, S; Foka, P; Fokin, S; Fragiacomo, E; Francescon, A; Franco, M; Frankenfeld, U; Fuchs, U; Furget, C; Fusco Girard, M; Gaardhoje, J J; Gagliardi, M; Gajanana, D; Gallio, M; Gangadharan, D R; Ganoti, P; Garabatos, C; Garcia-Solis, E; Gargiulo, C; Garishvili, I; Gerhard, J; Germain, M; Gheata, A; Gheata, M; Ghidini, B; Ghosh, P; Ghosh, S K; Gianotti, P; Giubilato, P; Giubellino, P; Gladysz-Dziadus, E; Glässel, P; Gomez, R; Gomez Marzoa, M; González-Zamora, P; Gorbunov, S; Görlich, L; Gotovac, S; Graczykowski, L K; Grajcarek, R; Greiner, L C; Grelli, A; Grigoras, A; Grigoras, C; Grigoriev, V; Grigoryan, A; Grigoryan, S; Grinyov, B; Grion, N; Grondin, D; Grosse-Oetringhaus, J F; Grossiord, J -Y; Grosso, R; Guber, F; Guernane, R; Guerzoni, B; Guilbaud, M; Gulbrandsen, K; Gulkanyan, H; Gunji, T; Gupta, A; Gupta, R; H Khan, K; Haake, R; Haaland, o; Hadjidakis, C; Haiduc, M; Hamagaki, H; Hamar, G; Hanratty, L D; Hansen, A; Harris, J W; Hartmann, H; Harton, A; Hatzifotiadou, D; Hayashi, S; Heckel, S T; Heide, M; Helstrup, H; Hennes, E; Herghelegiu, A; Herrera Corral, G; Hess, B A; Hetland, K F; Hicks, B; Hillemanns, H; Himmi, A; Hippolyte, B; Hladky, J; Hristov, P; Huang, M; Hu-Guo, C; Humanic, T J; Hutter, D; Hwang, D S; Igolkin, S; Ijzermans, P; Ilkaev, R; Ilkiv, I; Inaba, M; Incani, E; Innocenti, G M; Ionita, C; Ippolitov, M; Irfan, M; Ivanov, M; Ivanov, V; Ivanytskyi, O; Jacholkowski, A; Jadlovsky, J; Jahnke, C; Jang, H J; Janik, M A; Jayarathna, P H S Y; Jena, S; Jimenez Bustamante, R T; Jones, P G; Jung, H; Junique, A; Jusko, A; Kalcher, S; Kalinak, P; Kalweit, A; Kamin, J; Kang, J H; Kaplin, V; Kar, S; Karasu Uysal, A; Karavichev, O; Karavicheva, T; Karpechev, E; Kebschull, U; Keidel, R; Keil, M; Ketzer, B; Khan, M Mohisin; Khan, P; Khan, S A; Khanzadeev, A; Kharlov, Y; Kileng, B; Kim, B; Kim, D; Kim, D W; Kim, D J; Kim, J S; Kim, M; Kim, M; Kim, S; Kim, T; Kirsch, S; Kisel, I; Kiselev, S; Kisiel, A; Kiss, G; Klay, J L; Klein, J; Klein-Bösing, C; Kluge, A; Knichel, M L; Knospe, A G; Kobdaj, C; Kofarago, M; Köhler, M K; Kollegger, T; Kolojvari, A; Kondratiev, V; Kondratyeva, N; Konevskikh, A; Kovalenko, V; Kowalski, M; Kox, S; Koyithatta Meethaleveedu, G; Kral, J; Králik, I; Kramer, F; Kravcáková, A; Krelina, M; Kretz, M; Krivda, M; Krizek, F; Krus, M; Krymov, E B; Kryshen, E; Krzewicki, M; Kucera, V; Kucheriaev, Y; Kugathasan, T; Kuhn, C; Kuijer, P G; Kulakov, I; Kumar, J; Kurashvili, P; Kurepin, A; Kurepin, A B; Kuryakin, A; Kushpil, S; Kushpil, V; Kweon, M J; Kwon, Y; Ladron de Guevara, P; Lagana Fernandes, C; Lakomov, I; Langoy, R; Lara, C; Lardeux, A; Lattuca, A; La Pointe, S L; La Rocca, P; Lea, R; Lee, G R; Legrand, I; Lehnert, J; Lemmon, R C; Lenhardt, M; Lenti, V; Leogrande, E; Leoncino, M; León Monzón, I; Lesenechal, Y; Lévai, P; Li, S; Lien, J; Lietava, R; Lindal, S; Lindenstruth, V; Lippmann, C; Lisa, M A; Listratenko, O M; Ljunggren, H M; Lodato, D F; Loddo, F; Loenne, P I; Loggins, V R; Loginov, V; Lohner, D; Loizides, C; Lopez, X; López Torres, E; Lu, X -G; Luettig, P; Lunardon, M; Luo, J; Luparello, G; Luzzi, C; M Gago, A; M Jacobs, P; Ma, R; Maevskaya, A; Mager, M; Mahapatra, D P; Maire, A; Malaev, M; Maldonado Cervantes, I; Malinina, L; Mal'Kevich, D; Maltsev, N A; Malzacher, P; Mamonov, A; Manceau, L; Manko, V; Manso, F; Manzari, V; Mapelli, A; Marchisone, M; Mares, J; Margagliotti, G V; Margotti, A; Marín, A; Marin Tobon, C A; Markert, C; Marquard, M; Marras, D; Martashvili, I; Martin, N A; Martinengo, P; Martínez, M I; Martínez García, G; Martin Blanco, J; Martynov, Y; Mas, A; Masciocchi, S; Masera, M; Maslov, M; Masoni, A; Massacrier, L; Mastroserio, A; Mattiazzo, S; Matyja, A; Mayer, C; Mazer, J; Mazumder, R; Mazza, G; Mazzoni, M A; Meddi, F; Menchaca-Rocha, A; Mercado Pérez, J; Meres, M; Miake, Y; Mikhaylov, K; Milano, L; Milosevic, J; Mischke, A; Mishra, A N; Miskowiec, D; Mitu, C M; Mlynarz, J; Mohanty, B; Molnar, L; Mongelli, M; Montaño Zetina, L; Montes, E; Morando, M; Moreira De Godoy, D A; Morel, F; Moretto, S; Morreale, A; Morsch, A; Muccifora, V; Mudnic, E; Muhammad Bhopal, F; Muhuri, S; Mukherjee, M; Müller, H; Munhoz, M G; Murray, S; Musa, L; Musinsky, J; Nandi, B K; Nania, R; Nappi, E; Nattrass, C; Nayak, T K; Nazarenko, S; Nedosekin, A; Nicassio, M; Niculescu, M; Nielsen, B S; Nikolaev, S; Nikulin, S; Nikulin, V; Nilsen, B S; Noferini, F; Nomokonov, P; Nooren, G; Nyanin, A; Nystrand, J; Oeschler, H; Oh, S; Oh, S K; Okatan, A; Olah, L; Oleniacz, J; Oliveira Da Silva, A C; Onderwaater, J; Oppedisano, C; Ortiz Velasquez, A; Oskarsson, A; Otwinowski, J; Oyama, K; Pachmayer, Y; Pachr, M; Pagano, P; Paic, G; Painke, F; Pajares, C; Pal, S K; Palmeri, A; Panati, S; Pant, D; Pantano, D; Papikyan, V; Pappalardo, G S; Park, W J; Passfeld, A; Pastore, C; Patalakha, D I; Paticchio, V; Paul, B; Pawlak, T; Peitzmann, T; Pereira Da Costa, H; Pereira De Oliveira Filho, E; Peresunko, D; Pérez Lara, C E; Peryt, W; Pesci, A; Pestov, Y; Petagna, P; Petrácek, V; Petran, M; Petris, M; Petrovici, M; Petta, C; Pham, H; Piano, S; Pikna, M; Pillot, P; Pinazza, O; Pinsky, L; Piyarathna, D B; Ploskon, M; Planinic, M; Pluta, J; Pochybova, S; Podesta-Lerma, P L M; Poghosyan, M G; Pohjoisaho, E H O; Polichtchouk, B; Poljak, N; Pop, A; Porteboeuf-Houssais, S; Porter, J; Pospisil, V; Potukuchi, B; Prasad, S K; Preghenella, R; Prino, F; Protsenko, M A; Pruneau, C A; Pshenichnov, I; Puddu, G; Puggioni, C; Punin, V; Putschke, J; Qvigstad, H; Rachevski, A; Raha, S; Rak, J; Rakotozafindrabe, A; Ramello, L; Raniwala, R; Raniwala, S; Räsänen, S S; Rascanu, B T; Rasson, J E; Rathee, D; Rauf, A W; Razazi, V; Read, K F; Real, J S; Redlich, K; Reed, R J; Rehman, A; Reichelt, P; Reicher, M; Reidt, F; Renfordt, R; Reolon, A R; Reshetin, A; Rettig, F; Revol, J -P; Reygers, K; Riabov, V; Ricci, R A; Richert, T; Richter, M; Riedler, P; Riegler, W; Riggi, F; Rivetti, A; Rocco, E; Rodríguez Cahuantzi, M; Rodriguez Manso, A; Roed, K; Rogochaya, E; Rohni, S; Rohr, D; Röhrich, D; Romita, R; Ronchetti, F; Ronflette, L; Rosnet, P; Rossegger, S; Rossewij, M J; Rossi, A; Roudier, S; Rousset, J; Roy, A; Roy, C; Roy, P; Rubio Montero, A J; Rui, R; Russo, R; Ryabinkin, E; Ryabov, Y; Rybicki, A; Sacchetti, M; Sadovsky, S; Safarík, K; Sahlmuller, B; Sahoo, R; Sahu, P K; Saini, J; Salgado, C A; Salzwedel, J; Sambyal, S; Samsonov, V; Sanchez Castro, X; Sánchez Rodríguez, F J; sándor, L; Sandoval, A; Sano, M; Santagati, G; Santoro, R; Sarkar, D; Scapparone, E; Scarlassara, F; Scharenberg, R P; Schiaua, C; Schicker, R; Schipper, J D; Schmidt, C; Schmidt, H R; Schuchmann, S; Schukraft, J; Schulc, M; Schuster, T; Schutz, Y; Schwarz, K; Schweda, K; Scioli, G; Scomparin, E; Scott, P A; Scott, R; Segato, G; Seger, J E; Selyuzhenkov, I; Senyukhov, S; Seo, J; Serradilla, E; Sevcenco, A; Sgura, I; Shabetai, A; Shabratova, G; Shahoyan, R; Shangaraev, A; Sharma, N; Sharma, S; Shigaki, K; Shtejer, K; Sibiriak, Y; Siddhanta, S; Siemiarczuk, T; Silvermyr, D; Silvestre, C; Simatovic, G; Singaraju, R; Singh, R; Singha, S; Singhal, V; Sinha, B C; Sinha, T; Sitar, B; Sitta, M; Skaali, T B; Skjerdal, K; Smakal, R; Smirnov, N; Snellings, R J M; Snoeys, W; Sogaard, C; Soltz, R; Song, J; Song, M; Sooden, V; Soramel, F; Sorensen, S; Spacek, M; spalek, J; Spiriti, E; Sputowska, I; Spyropoulou-Stassinaki, M; Srivastava, B K; Stachel, J; Stan, I; Stefanek, G; Steinpreis, M; Stenlund, E; Steyn, G; Stiller, J H; Stocco, D; Stolpovskiy, M; Strmen, P; Suaide, A A P; Subieta Vasquez, M A; Sugitate, T; Suire, C; Suleymanov, M; suljic, M; Sultanov, R; sumbera, M; Sun, X; Susa, T; Symons, T J M; Szanto de Toledo, A; Szarka, I; Szczepankiewicz, A; Szymanski, M; Takahashi, J; Tangaro, M A; Tapia Takaki, J D; Tarantola Peloni, A; Tarazona Martinez, A; Tauro, A; Tejeda Muñoz, G; Telesca, A; Terrevoli, C; Ter Minasyan, A; Thäder, J; Thomas, D; Tieulent, R; Timmins, A R; Toia, A; Torii, H; Trubnikov, V; Trzaska, W H; Tsuji, T; Tumkin, A; Turchetta, R; Turrisi, R; Tveter, T S; Tymchuk, I T; Ulery, J; Ullaland, K; Uras, A; Usai, G L; Vajzer, M; Vala, M; Valencia Palomo, L; Valentino, V; Valin, I; Vallero, S; Vande Vyvre, P; Vannucci, L; Van Der Maarel, J; Van Hoorne, J W; van Leeuwen, M; Vargas, A; Varma, R; Vasileiou, M; Vasiliev, A; Vasta, P; Vechernin, V; Veldhoen, M; Velure, A; Venaruzzo, M; Vercellin, E; Vergara Limón, S; Verlaat, B; Vernet, R; Verweij, M; Vickovic, L; Viesti, G; Viinikainen, J; Vilakazi, Z; Villalobos Baillie, O; Vinogradov, A; Vinogradov, L; Vinogradov, Y; Virgili, T; Viyogi, Y P; Vodopyanov, A; Völkl, M A; Voloshin, K; Voloshin, S A; Volpe, G; von Haller, B; Vorobyev, I; Vranic, D; Vrláková, J; Vulpescu, B; Vyushin, A; Wagner, B; Wagner, J; Wagner, V; Wang, M; Wang, Y; Watanabe, D; Weber, M; Wessels, J P; Westerhoff, U; Wiechula, J; Wikne, J; Wilde, M; Wilk, G; Wilkinson, J; Williams, M C S; Windelband, B; Winn, M; Winter, M; Xiang, C; Yaldo, C G; Yamaguchi, Y; Yang, H; Yang, P; Yang, S; Yano, S; Yasnopolskiy, S; Yi, J; Yin, Z; Yoo, I -K; Yushmanov, I; Zaccolo, V; Zach, C; Zaman, A; Zampolli, C; Zaporozhets, S; Zarochentsev, A; Závada, P; Zaviyalov, N; Zbroszczyk, H; Zgura, I S; Zhalov, M; Zhang, F; Zhang, H; Zhang, X; Zhang, Y; Zhao, C; Zherebchevsky, V I; Zhou, D; Zhou, F; Zhou, Y; Zhu, H; Zhu, J; Zhu, X; Zichichi, A; Zimmermann, A; Zinovjev, G; Zoccarato, Y; Zynovyev, M; Zyzak, M; CERN. Geneva. The LHC experiments Committee; LHCC

    2014-01-01

    The long term goal of the ALICE experiment is to provide a precise characterization of the high-density, high-temperature phase of strongly interacting matter. To achieve this goal, high-statistics precision measurement are required. The general upgrade strategy for the ALICE detector is conceived to deal with this challenge with expected Pb-Pb interaction rates of up to 50 kHz aiming at an integrated luminosity of the order of 10 nb^-1. With the proposed timeline, starting the high-rate operation progressively after 2018 shutdown, the goals set up in our upgrade plans should be achieved collecting data until mid-2020's. In this document we present the main physics motivations for running the LHC with heavy ions at high luminosities and discuss the modifications and replacements needed in the ALICE detectors, the online systems and offline system. The schedule, cost estimate and organization of the upgrade programme are presented as well.

  11. Status of the Multipurpose Canister (MPC) Project

    International Nuclear Information System (INIS)

    Hopper, J.P.

    1996-01-01

    The multipurpose canister (MPC) project represents a cornerstone of the current U.S. Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) program for handling spent nuclear fuel. The MPC and associated support equipment is being designed to accommodate the requirements for not only storage and transport but also for the specified disposal requirements of the mined geologic repository system. The phase 1 design effort for the MPC system, being performed by the Westinghouse team on behalf of TRW Environmental Safety Systems (TESS), the OCRWM management ampersand operating (M ampersand O) contractor, is on schedule for delivery of completed safety analysis reports (SARs) in April 1996

  12. MPC control of water supply networks

    DEFF Research Database (Denmark)

    Baunsgaard, Kenneth Marx Hoe; Ravn, Ole; Kallesoe, Carsten Skovmose

    2016-01-01

    This paper investigates the modelling and predictive control of a drinking water supply network with the aim of minimising the energy and economic cost. A model predictive controller, MPC, is applied to a nonlinear model of a drinking water network that follows certain constraints to maintain......, controlling the drinking water supply network with the MPC showed reduction of the energy and the economic cost of running the system. This has been achieved by minimising actuator control effort and by shifting the actuator use towards the night time, where energy prices are lower. Along with energy cost...... consumer pressure desire. A model predictive controller, MPC, is based on a simple model that models the main characteristics of a water distribution network, optimizes a desired cost minimisation, and keeps the system inside specified constraints. In comparison to a logic (on/off) control design...

  13. Laser performance upgrade for precise ICF experiment in SG-Ⅲ laser facility

    Directory of Open Access Journals (Sweden)

    Wanguo Zheng

    2017-09-01

    Full Text Available The SG-Ⅲ laser facility (SG-Ⅲ is the largest laser driver for inertial confinement fusion (ICF researches in China, which has 48 beamlines and can deliver 180 kJ ultraviolet laser energy in 3 ns. In order to meet the requirements of precise physics experiments, some new functionalities need to be added to SG-Ⅲ and some intrinsic laser performances need upgrade. So at the end of SG-Ⅲ's engineering construction, the 2-year laser performance upgrade project started. This paper will introduce the newly added functionalities and the latest laser performance of SG-Ⅲ. With these function extensions and performance upgrade, SG-Ⅲ is now fully prepared for precise ICF experiments and solidly paves the way towards fusion ignition.

  14. Optimization based tuning approach for offset free MPC

    DEFF Research Database (Denmark)

    Olesen, Daniel Haugård; Huusom, Jakob Kjøbsted; Jørgensen, John Bagterp

    2012-01-01

    We present an optimization based tuning procedure with certain robustness properties for an offset free Model Predictive Controller (MPC). The MPC is designed for multivariate processes that can be represented by an ARX model. The advantage of ARX model representations is that standard system...... identifiation techniques using convex optimization can be used for identification of such models from input-output data. The stochastic model of the ARX model identified from input-output data is modified with an ARMA model designed as part of the MPC-design procedure to ensure offset-free control. The ARMAX...... model description resulting from the extension can be realized as a state space model in innovation form. The MPC is designed and implemented based on this state space model in innovation form. Expressions for the closed-loop dynamics of the unconstrained system is used to derive the sensitivity...

  15. On the theoretical gap between synchronous and asynchronous MPC protocols

    DEFF Research Database (Denmark)

    Beerliová-Trubíniová, Zuzana; Hirt, Martin; Nielsen, Jesper Buus

    2010-01-01

    that in the cryptographic setting (with setup), the sole reason for it is the distribution of inputs: given an oracle for input distribution, cryptographically-secure asynchronous MPC is possible with the very same condition as synchronous MPC, namely t ..., we show that such an input-distribution oracle can be reduced to an oracle that allows each party to synchronously broadcast one single message. This means that when one single round of synchronous broadcast is available, then asynchronous MPC is possible at the same condition as synchronous MPC...

  16. TMX-U [Tandem Mirror Experiment-Upgrade]: Final report, Volume 1

    International Nuclear Information System (INIS)

    Porter, G.D.

    1988-01-01

    This paper discusses the plasma control and the physics accomplishments of the Tandem Mirror Experiment-Upgrade. This particular volume discusses potential measurements, plasma confinement, and hot electron and ion physics. 230 refs

  17. The ATLAS SCT: Commissioning experience and SLHC upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Mitrevski, J. [Santa Cruz Institute for Particle Physics, University of California, Santa Cruz, CA 95064 (United States)], E-mail: Jovan.Mitrevski@cern.ch

    2009-06-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  18. The ATLAS SCT: Commissioning experience and SLHC upgrade

    International Nuclear Information System (INIS)

    Mitrevski, J.

    2009-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, the SLHC. This is mainly driven by occupancy and radiation hardness issues. The new tracker will likely be entirely made of silicon, with the space of the present SCT largely taken up by detectors with much shorter strips. Several large-scale R and D projects on the sensors and module concepts for this upgrade are running, including sensor and module prototyping. We will report upon the commissioning experience from the SCT, use it to extract valuable lessons for future silicon tracker projects, and give an up-to-date overview of the status and results of the R and D efforts for the ATLAS tracker upgrade.

  19. Experiences upgrading a fluoroscopic system to digital specifications

    International Nuclear Information System (INIS)

    Fox, T.; Fenzl, G.

    1995-01-01

    In 1993, an undertable fluoroscopic system was retrofitted with a Fluorospot HC digital system at the radiological clinic of the Knappschaftskrankenhaus in Puettlingen, Germany. The experiences and possibilities resulting from this digital upgrade are related by the authors, whose narrative is also accompanied by examples of clinical images. The costs involved are also discussed in this article. (orig.)

  20. TMX-U [Tandem Mirror Experiment-Upgrade]: Final report, Volume 2

    International Nuclear Information System (INIS)

    Porter, G.D.

    1988-01-01

    This paper discusses the plasma control and the physics accomplishments of the Tandem Mirror Experiment-Upgrade. This particular volume discusses fueling, ion heating, Fokker-Planck modeling, plasma stability and technical development. 270 refs

  1. Prompt photon measurements with PHENIX's MPC-EX detector

    Science.gov (United States)

    Campbell, Sarah; PHENIX Collaboration

    2013-08-01

    The MPC-EX detector is a Si-W preshower extension to the existing Muon Piston Calorimeter (MPC). The MPC-EX consists of eight layers of alternating W absorber and Si mini-pad sensors. Located at forward rapidity, 3.1 80 GeV, a factor of four improvement over current capabilities. Not only will the MPC-EX strengthen PHENIX's existing forward π0 and jet measurements, it will provide sufficient prompt photon and π0 separation to make a prompt photon measurement possible. Prompt photon yields at high pT, pT > 3 GeV/c, can be statistically extracted using the double ratio method. In transversely polarized p+p collisions, the measurement of the prompt photon single spin asymmetry, AN, will resolve the sign discrepancy between the Sivers and twist-3 extractions of AN. In p+Au collisions, the prompt photon RpAu will quantify the level of gluon saturation in the Au nucleus at low-x, x ~ 10-3, with a projected systematic error band a factor of four smaller than EPS09's current allowable range. The MPC-EX detector will expand our understanding of the gluon nuclear parton distribution functions, providing important information about the initial state of heavy ion collisions, and clarify how the valence parton's transverse momentum and spin correlates to the proton spin.

  2. 32 CFR 635.20 - Military Police Codes (MPC).

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Military Police Codes (MPC). 635.20 Section 635.20 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS LAW ENFORCEMENT REPORTING Offense Reporting § 635.20 Military Police Codes (MPC). (a) MPCs identify individual Provos...

  3. Economic MPC for a linear stochastic system of energy units

    DEFF Research Database (Denmark)

    Jørgensen, John Bagterp; Sokoler, Leo Emil; Standardi, Laura

    2016-01-01

    This paper summarizes comprehensively the work in four recent PhD theses from the Technical University of Denmark related to Economic MPC of future power systems. Future power systems will consist of a large number of decentralized power producers and a large number of controllable power consumers...... in addition to stochastic power producers such as wind turbines and solar power plants. Control of such large scale systems requires new control algorithms. In this paper, we formulate the control of such a system as an Economic Model Predictive Control (MPC) problem. When the power producers and controllable...... power consumers have linear dynamics, the Economic MPC may be expressed as a linear program. We provide linear models for a number of energy units in an energy system, formulate an Economic MPC for coordination of such a system. We indicate how advances in computational MPC makes the solutions...

  4. LHCb: Fast Readout Control for the upgraded readout architecture of the LHCb experiment at CERN

    CERN Multimedia

    Alessio, F

    2013-01-01

    The LHCb experiment at CERN has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity with an upgraded LHCb detector. As a consequence, the various LHCb sub-systems in the readout architecture will be upgraded to cope with higher sub-detector occupancies, higher rate, and higher readout load. The new architecture, new functionalities, and the first hardware implementation of a new LHCb Readout Control system (commonly referred to as S-TFC) for the upgraded LHCb experiment is here presented. Our attention is focused in describing solutions for the distribution of clock and timing information to control the entire upgraded readout architecture by profiting of a bidirectional optical network and powerful FPGAs, including a real-time mechanism to synchronize the entire system. Solutions and implementations are presented, together with first results on the simulation and the validation of the system.

  5. MPC Related Computational Capabilities of ARMv7A Processors

    DEFF Research Database (Denmark)

    Frison, Gianluca; Jørgensen, John Bagterp

    2015-01-01

    In recent years, the mass market of mobile devices has pushed the demand for increasingly fast but cheap processors. ARM, the world leader in this sector, has developed the Cortex-A series of processors with focus on computationally intensive applications. If properly programmed, these processors...... are powerful enough to solve the complex optimization problems arising in MPC in real-time, while keeping the traditional low-cost and low-power consumption. This makes these processors ideal candidates for use in embedded MPC. In this paper, we investigate the floating-point capabilities of Cortex A7, A9...... and A15 and show how to exploit the unique features of each processor to obtain the best performance, in the context of a novel implementation method for the linear-algebra routines used in MPC solvers. This method adapts high-performance computing techniques to the needs of embedded MPC. In particular...

  6. Upgrade of the global muon trigger at the CMS experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00282545; Sakulin, Hannes

    2016-09-14

    The Compact Muon Solenoid (CMS) experiment is one of two general purpose detectors at the Large Hadron Collider (LHC) at the particle physics research laboratory in Geneva (CERN). As such it allows a broad array of physics analyses from precision measurements of the standard model of particle physics to searches for exotic new particles. A series of upgrades and maintenance procedures took place in the first shut down from 2013 to 2015. The aim was to prepare the LHC for the collision energy of 13 TeV and further increase its luminosity. During this shut down also upgrades of the CMS experiment were installed.Due to the high rate of collisions at the LHC, it is impossible to record all such events. In order to reduce the event rate to a manageable level, a trigger system is deployed that selects interesting events. At the CMS experiment this system is divided into two levels: A first hardware based system that is optimised for speed and a second that is software based and applies more time consuming and preci...

  7. Silicon vertex detector upgrade in the ALPHA experiment

    CERN Document Server

    Amole, C; Ashkezari, M.D; Baquero-Ruiz, M; Bertsche, W; Burrows, C; Butler, E; Capra, A; Cesar, C.L; Chapman, S; Charlton, M; Deller, A; Eriksson, S; Fajans, J; Friesen, T; Fujiwara, M.C; Gill, D.R; Gutierrez, A; Hangst, J.S; Hardy, W.N; Hayden, M.E; Humphries, A.J; Isaac, C.A; Jonsell, S; Kurchaninov, L; Little, A; Madsen, N; McKenna, J.T.K; Menary, S; Napoli, S.C; Nolan, P; Olchanski, K; Olin, A; Povilus, A; Pusa, P; Rasmussen, C.Ø; Robicheaux, F; Sacramento, R.L; Sampson, J.A; Sarid, E; Seddon, D; Silveira, D.M; So, C; Stracka, S; Tharp, T; Thompson, R.I; Thornhill, J; Tooley, M.P; Van Der Werf, D.P; Wells, D

    2013-01-01

    The Silicon Vertex Detector (SVD) is the main diagnostic tool in the ALPHA-experiment. It provides precise spatial and timing information of antiproton (antihydrogen) annihilation events (vertices), and most importantly, the SVD is capable of directly identifying and analysing single annihilation events, thereby forming the basis of ALPHA ' s analysis. This paper describes the ALPHA SVD and its upgrade, installed in the ALPHA ' s new neutral atom trap.

  8. Silicon vertex detector upgrade in the ALPHA experiment

    Energy Technology Data Exchange (ETDEWEB)

    Amole, C. [Department of Physics and Astronomy, York University, Toronto, ON, M3J 1P3 (Canada); Andresen, G.B. [Department of Physics and Astronomy, Aarhus University, DK-8000 Aarhus C (Denmark); Ashkezari, M.D. [Department of Physics, Simon Fraser University, Burnaby, BC, V5A 1S6 (Canada); Baquero-Ruiz, M. [Department of Physics, University of California at Berkeley, Berkeley, CA 94720-7300 (United States); Bertsche, W. [School of Physics and Astronomy, University of Manchester, M13 9PL Manchester (United Kingdom); The Cockcroft Institute, Daresbury Laboratory, WA4 4AD Warrington (United Kingdom); Burrows, C. [Department of Physics, College of Science, Swansea University, Swansea SA2 8PP (United Kingdom); Butler, E. [Physics Department, CERN, CH-1211 Geneva 23 (Switzerland); Capra, A. [Department of Physics and Astronomy, York University, Toronto, ON, M3J 1P3 (Canada); Cesar, C.L. [Instituto de Física, Universidade Federal do Rio de Janeiro, Rio de Janeiro 21941-972 (Brazil); Chapman, S. [Department of Physics, University of California at Berkeley, Berkeley, CA 94720-7300 (United States); Charlton, M.; Deller, A.; Eriksson, S. [Department of Physics, College of Science, Swansea University, Swansea SA2 8PP (United Kingdom); Fajans, J. [Department of Physics, University of California at Berkeley, Berkeley, CA 94720-7300 (United States); Lawrence Berkeley National Laboratory, Berkeley, CA 94720 (United States); Friesen, T. [Department of Physics and Astronomy, University of Calgary, Calgary, Alberta T2N 1N4 (Canada); Fujiwara, M.C. [Department of Physics and Astronomy, University of Calgary, Calgary, Alberta T2N 1N4 (Canada); TRIUMF, 4004 Wesbrook Mall, Vancouver, BC, V6T 2A3 (Canada); Gill, D.R. [TRIUMF, 4004 Wesbrook Mall, Vancouver, BC, V6T 2A3 (Canada); Gutierrez, A. [Department of Physics and Astronomy, University of British Columbia, Vancouver, BC, V6T 1Z4 (Canada); and others

    2013-12-21

    The Silicon Vertex Detector (SVD) is the main diagnostic tool in the ALPHA-experiment. It provides precise spatial and timing information of antiproton (antihydrogen) annihilation events (vertices), and most importantly, the SVD is capable of directly identifying and analysing single annihilation events, thereby forming the basis of ALPHA's analysis. This paper describes the ALPHA SVD and its upgrade, installed in the ALPHA's new neutral atom trap.

  9. U.S. Department of Energy physical protection upgrades at the Latvian Academy of Sciences Nuclear Research Center, Latvia

    International Nuclear Information System (INIS)

    Haase, M.; Hine, C.; Robertson, C.

    1996-01-01

    Approximately five years ago, the Safe, Secure Dismantlement program was started between the US and countries of the Former Soviet Union (FSU). The purpose of the program is to accelerate progress toward reducing the risk of nuclear weapons proliferation, including such threats as theft, diversion, and unauthorized possession of nuclear materials. This would be accomplished by strengthening the material protection, control, and accounting systems within the FSU countries. Under the US Department of Energy''s program of providing cooperative assistance to the FSU countries in the areas of Material Protection, Control, and Accounting (MPC and A), the Latvian Academy of Sciences Nuclear Research Center (LNRC) near Riga, Latvia, was identified as a candidate site for a cooperative MPC and A project. The LNRC is the site of a 5-megawatt IRT-C pool-type research reactor. This paper describes: the process involved, from initial contracting to project completion, for the physical protection upgrades now in place at the LNRC; the intervening activities; and a brief overview of the technical aspects of the upgrades

  10. MPC and ALI: their basis and their comparison

    International Nuclear Information System (INIS)

    Kennedy, W.E. Jr.; Watson, E.C.

    1981-03-01

    Radiation protection regulations in the United States have evolved from the recommendations of the International Commission on Radiological Protection (ICRP) and the National Council on Radiation Protection and Measurements (NCRP). In 1959, the ICRP issued Publication 2 which contained specific recommendations on dose rate limits, permissible body burdens, metabolic data for radionuclides, and maximum permissible concentrations (MPC) in air or water. Over the next 20 years, new information became available concerning the effects of radiation, the uptake and retention of radionuclides, and the radioactive decay schemes of parent radionuclides. To include this newer information, the ICRP issued Publication 30 in 1978 to supersede Publication 2. One of the secondary limits defined in Publication 30 is the annual limit of intake (ALI). Radionuclide specific ALI values are intended to replace MPC values in determining whether or not ambient air and water concentrations are sufficiently low to maintain the dose to workers within accepted dose rate limits. In this paper, we discuss the derivation of MPC and ALI values, compare inhalation committed dose equivalent factors derived from ICRP Publications 2 and 30, and discuss the practical implications of using either MPC or ALI in determining compliance with occupational exposure limits. 6 references

  11. A Tuning Procedure for ARX-based MPC of Multivariate Processes

    DEFF Research Database (Denmark)

    Olesen, Daniel; Huusom, Jakob Kjøbsted; Jørgensen, John Bagterp

    2013-01-01

    We present an optimization based tuning procedure with certain robustness properties for an offset free Model Predictive Controller (MPC). The MPC is designed for multivariate processes that can be represented by an ARX model. The stochastic model of the ARX model identified from input-output data...... is modified with an ARMA model designed as part of the MPC-design procedure to ensure offset-free control. The MPC is designed and implemented based on a state space model in innovation form. Expressions for the closed-loop dynamics of the unconstrained system is used to derive the sensitivity function...... to a constraint on the maximum of the sensitivity function. The latter constraint provides a robustness measure that is essential for the procedure. The method is demonstrated for two simulated examples: A Wood-Berry distillation column example and a cement mill example....

  12. Time accuracy requirements for fusion experiments: A case study at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Raupp, Gerhard; Behler, Karl; Eixenberger, Horst; Fitzek, Michael; Kollotzek, Horst; Lohs, Andreas; Lueddecke, Klaus; Mueller, Peter; Merkel, Roland; Neu, Gregor; Schacht, Joerg; Schramm, Gerold; Treutterer, Wolfgang; Zasche, Dieter; Zehetbauer, Thomas

    2010-01-01

    To manage and operate a fusion device and measure meaningful data an accurate and stable time is needed. As a benchmark, we suggest to consider time accuracy as sufficient if it is better than typical data errors or process timescales. This allows to distinguish application domains and chose appropriate time distribution methods. For ASDEX Upgrade a standard NTP method provides Unix time for project and operation management tasks, and a dedicated time system generates and distributes a precise experiment time for physics applications. Applying the benchmark to ASDEX Upgrade shows that physics measurements tagged with experiment time meet the requirements, while correlation of NTP tagged operation data with physics data tagged with experiment time remains problematic. Closer coupling of the two initially free running time systems with daily re-sets was an efficient and satisfactory improvement. For ultimate accuracy and seamless integration, however, continuous adjustment of the experiment time clock frequency to NTP is needed, within frequency variation limits given by the benchmark.

  13. A Reduced Dantzig-Wolfe Decomposition for a Suboptimal Linear MPC

    DEFF Research Database (Denmark)

    Standardi, Laura; Poulsen, Niels Kjølstad; Jørgensen, John Bagterp

    2014-01-01

    Linear Model Predictive Control (MPC) is an efficient control technique that repeatedly solves online constrained linear programs. In this work we propose an economic linear MPC strategy for operation of energy systems consisting of multiple and independent power units. These systems cooperate...

  14. Multi-model MPC with output feedback

    Directory of Open Access Journals (Sweden)

    J. M. Perez

    2014-03-01

    Full Text Available In this work, a new formulation is presented for the model predictive control (MPC of a process system that is represented by a finite set of models, each one corresponding to a different operating point. The general case is considered of systems with stable and integrating outputs in closed-loop with output feedback. For this purpose, the controller is based on a non-minimal order model where the state is built with the measured outputs and the manipulated inputs of the control system. Therefore, the state can be considered as perfectly known and, consequently, there is no need to include a state observer in the control loop. This property of the proposed modeling approach is convenient to extend previous stability results of the closed loop system with robust MPC controllers based on state feedback. The controller proposed here is based on the solution of two optimization problems that are solved sequentially at the same time step. The method is illustrated with a simulated example of the process industry. The rigorous simulation of the control of an adiabatic flash of a multi-component hydrocarbon mixture illustrates the application of the robust controller. The dynamic simulation of this process is performed using EMSO - Environment Model Simulation and Optimization. Finally, a comparison with a linear MPC using a single model is presented.

  15. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  16. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  17. Upgrading of the LGD cluster at JINR to support DLNP experiments

    Science.gov (United States)

    Bednyakov, I. V.; Dolbilov, A. G.; Ivanov, Yu. P.

    2017-01-01

    Since its construction in 2005, the Computing Cluster of the Dzhelepov Laboratory of Nuclear Problems has been mainly used to perform calculations (data analysis, simulation, etc.) for various scientific collaborations in which DLNP scientists take an active part. The Cluster also serves to train specialists. Much has changed in the past decades, and the necessity has arisen to upgrade the cluster, increasing its power and replacing the outdated equipment to maintain its reliability and modernity. In this work we describe the experience of performing this upgrading, which can be helpful for system administrators to put new equipment for clusters of this type into operation quickly and efficiently.

  18. Nitrogen implantation in tungsten and migration in the fusion experiment ASDEX upgrade

    International Nuclear Information System (INIS)

    Meisl, Gerd Korbinian

    2015-01-01

    The implantation of nitrogen ions into tungsten was studied in laboratory experiments to understand the interaction of nitrogen containing fusion plasmas with tungsten walls. The resulting model of W-N interaction was tested by experiments in the tokamak ASDEX Upgrade. Using the measurements from these experiments as boundary condition, nitrogen transport and re-distribution in the plasma were modeled by self-consistent WallDYN-DIVIMP simulations.

  19. Experiments on hot-electron ECRH in the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Stallard, B.W.

    1983-01-01

    Experiments have begun on the Tandem Mirror Experiment Upgrade (TMX-U) using electron-cyclotron resonant heating (ECRH) to generate the hot electron populations required for thermal barrier operation (Energy E/sub eh/ approx. 50 keV, density n/sub eh/ 12 , and hot-to-cold fraction n/sub eh/n approx. 0.9). For this operation, rf power produced by 28-GHz gyrotrons is injected with extraordinary mode polarization at both fundamental and second harmonic locations. Our initial experiments, which concentrated on startup of the hot electrons, were carried out at low density ( 12 cm - 3 ) where Fokker-Planck calculations predict high heating efficiency when the electron temperature (T/sub e/) is low. Under these conditions, we produced substantial hot electron populations (diamagnetic energy > 400 J, E/sub eh/ in the range of 15 to 50 keV, and n/sub eh//n > 0.5)

  20. Resistive Micromegas for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Iodice, Mauro; The ATLAS collaboration

    2016-01-01

    Large size resistive Micromegas detectors will be employed for the first time in high-energy physics experiments for the Muon Spectrometer upgrade of the ATLAS experiment at CERN. The current innermost stations of the muon endcap system, the Small Wheel, will be upgraded in 2019 to retain the good precision tracking and trigger capabilities in the high background environment expected with the upcoming luminosity increase of the LHC. Along with the small-strip Thin Gap Chambers (sTGC) the “New Small Wheel” will be equipped with eight layers of Micromegas (MM) detectors arranged in multilayers of two quadruplets, for a total of about 1200 m$^2$ detection planes. All quadruplets have trapezoidal shapes with surface areas between 2 and 3 m$^2$. The Micromegas system will provide both trigger and tracking capabilities. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, a challenging mechanical precision is required in the construction for each plane of the assembled modules, with an alig...

  1. Operational Experience with Radioactive Source Calibration of the CMS Hadron Endcap Calorimeter Wedges with Phase I Upgrade Electronics

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The Phase I Upgrade of the CMS Hadron Endcap Calorimeters consists of new photodetectors and front-end electronics. The upgrade will allow the elimination of the high amplitude noise and drifting response of the Hybrid Photo-Diodes, at the same time enabling the mitigation of the radiation damage of the scintillators and the wavelength shifting fibers with a larger spectral acceptance of the Silicon Photomultipliers. The upgrade will also allow increasing the longitudinal segmentation of the readout to be beneficial for pile-up mitigation and recalibration due to depth-dependent radiation damage. As a realistic operational exercise, the responses of the Hadron Endcap Calorimeter wedges were calibrated with a 60Co radioactive source both with current and upgrade electronics. The exercise provided significant experience towards the full upgrade during the Year End Technical Stop 2017-2018. Here we describe the instrumentation details and the operational experiences related to the sourcing exercise.

  2. Commissioning Results of the Upgraded Neutralized Drift Compression Experiment

    International Nuclear Information System (INIS)

    Lidia, S.M.; Roy, P.K.; Seidl, P.A.; Waldron, W.L.; Gilson, E.P.

    2009-01-01

    Recent changes to the NDCX beamline offer the promise of higher charge compressed bunches (>15nC), with correspondingly large intensities (>500kW/cm 2 ), delivered to the target plane for ion-beam driven warm dense matter experiments. We report on commissioning results of the upgraded NDCX beamline that includes a new induction bunching module with approximately twice the volt-seconds and greater tuning flexibility, combined with a longer neutralized drift compression channel.

  3. MPC1-like Is a Placental Mammal-specific Mitochondrial Pyruvate Carrier Subunit Expressed in Postmeiotic Male Germ Cells

    OpenAIRE

    Vanderperre, Benoît; Cermakova, Kristina; Escoffier Breancon, Jessica; Kaba, Mayis; Bender, Tom; Nef, Serge; Martinou, Jean-Claude

    2016-01-01

    Selective transport of pyruvate across the inner mitochondrial membrane by the mitochondrial pyruvate carrier (MPC) is a fundamental step that couples cytosolic and mitochondrial metabolism. The recent molecular identification of the MPC complex has revealed two interacting subunits, MPC1 and MPC2. Although in yeast, an additional subunit, MPC3, can functionally replace MPC2, no alternative MPC subunits have been described in higher eukaryotes. Here, we report for the first time the existence...

  4. Upgrade for Phase II of the Gerda experiment

    Science.gov (United States)

    Agostini, M.; Bakalyarov, A. M.; Balata, M.; Barabanov, I.; Baudis, L.; Bauer, C.; Bellotti, E.; Belogurov, S.; Belyaev, S. T.; Benato, G.; Bettini, A.; Bezrukov, L.; Bode, T.; Borowicz, D.; Brudanin, V.; Brugnera, R.; Caldwell, A.; Cattadori, C.; Chernogorov, A.; D'Andrea, V.; Demidova, E. V.; Di Marco, N.; Domula, A.; Doroshkevich, E.; Egorov, V.; Falkenstein, R.; Frodyma, N.; Gangapshev, A.; Garfagnini, A.; Grabmayr, P.; Gurentsov, V.; Gusev, K.; Hakenmüller, J.; Hegai, A.; Heisel, M.; Hemmer, S.; Hiller, R.; Hofmann, W.; Hult, M.; Inzhechik, L. V.; Ioannucci, L.; Janicskó Csáthy, J.; Jochum, J.; Junker, M.; Kazalov, V.; Kermaïdic, Y.; Kihm, T.; Kirpichnikov, I. V.; Kirsch, A.; Kish, A.; Klimenko, A.; Kneißl, R.; Knöpfle, K. T.; Kochetov, O.; Kornoukhov, V. N.; Kuzminov, V. V.; Laubenstein, M.; Lazzaro, A.; Lebedev, V. I.; Lehnert, B.; Lindner, M.; Lippi, I.; Lubashevskiy, A.; Lubsandorzhiev, B.; Lutter, G.; Macolino, C.; Majorovits, B.; Maneschg, W.; Medinaceli, E.; Miloradovic, M.; Mingazheva, R.; Misiaszek, M.; Moseev, P.; Nemchenok, I.; Nisi, S.; Panas, K.; Pandola, L.; Pelczar, K.; Pullia, A.; Ransom, C.; Riboldi, S.; Rumyantseva, N.; Sada, C.; Salamida, F.; Salathe, M.; Schmitt, C.; Schneider, B.; Schönert, S.; Schreiner, J.; Schütz, A.-K.; Schulz, O.; Schwingenheuer, B.; Selivanenko, O.; Shevchik, E.; Shirchenko, M.; Simgen, H.; Smolnikov, A.; Stanco, L.; Vanhoefer, L.; Vasenko, A. A.; Veresnikova, A.; von Sturm, K.; Wagner, V.; Wegmann, A.; Wester, T.; Wiesinger, C.; Wojcik, M.; Yanovich, E.; Zhitnikov, I.; Zhukov, S. V.; Zinatulina, D.; Zsigmond, A. J.; Zuber, K.; Zuzel, G.

    2018-05-01

    The Gerda collaboration is performing a sensitive search for neutrinoless double beta decay of ^{76}Ge at the INFN Laboratori Nazionali del Gran Sasso, Italy. The upgrade of the Gerda experiment from Phase I to Phase II has been concluded in December 2015. The first Phase II data release shows that the goal to suppress the background by one order of magnitude compared to Phase I has been achieved. Gerda is thus the first experiment that will remain "background-free" up to its design exposure (100 kg year). It will reach thereby a half-life sensitivity of more than 10^{26} year within 3 years of data collection. This paper describes in detail the modifications and improvements of the experimental setup for Phase II and discusses the performance of individual detector components.

  5. Tandem-Mirror Experiment-Upgrade neutral pressure measurement diagnostic systems

    International Nuclear Information System (INIS)

    Pickles, W.L.; Allen, S.L.; Hill, D.N.; Hunt, A.L.; Simonen, T.C.

    1985-01-01

    The Tandem-Mirror Experiment-Upgrade (TMX-U) has a large and complex system of Bayard--Alpert, magnetron, and Penning gauges, in addition to mass spectrometers (RGA), all of which measure neutral pressures in the many internal regions of TMX-U. These pressure measurements are used as part of the confinement physics data base as well as for management of the TMX-U vacuum system. Dynamic pressures are modeled by a coupled-volumes simulation code, which includes wall reflux, getter pumping, and plasma pumping

  6. Resistive Micromegas for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00215987; The ATLAS collaboration

    2016-01-01

    Large size resistive micromegas detectors (MM) will be employed for the first time in high-energy physics experiments for the Muon Spectrometer upgrade of the ATLAS experiment at CERN. The current innermost stations of the muon endcap system, the Small Wheel, will be upgraded in 2019 to retain the good precision tracking and trigger capabilities in the high background environment expected with the upcoming luminosity increase of the LHC. Along with the small-strip Thin Gap Chambers (sTGC) the ``New Small Wheel'' will be equipped with eight layers of MM detectors arranged in multilayers of two quadruplets, for a total of about 1200 m$^2$ detection planes. All quadruplets have trapezoidal shapes with surface areas between 2 and 3 m$^2$. The MM system will provide both trigger and tracking capabilities. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, a challenging mechanical precision is required in the construction for each plane of the assembled modules, with an alignment of the reado...

  7. Economic MPC based on LPV model for thermostatically controlled loads

    DEFF Research Database (Denmark)

    Zemtsov, Nikita; Hlava, Jaroslav; Frantsuzova, Galina

    2017-01-01

    Rapid increase of the renewable energy share in electricity production requires optimization and flexibility of the power consumption side. Thermostatically controlled loads (TCLs) have a large potential for regulation service provision. Economic model predictive control (MPC) is an advanced...... control method which can be used to syncronize the power consumption with undispatchable renewable electricity production. Thermal behavior of TCLs can be described by linear models based on energy balance of the system. In some cases, parameters of the model may be time-varying. In this work, we present...... a modified economic MPC based on linear parameter-varying model. In particular, we provide an exact transformation from a standard economic MPC formulation to a linear program. We assume that the variables influencing the model parameters are known (predictable) for the prediction horizon of the controller...

  8. Robust Mpc for Actuator–Fault Tolerance Using Set–Based Passive Fault Detection and Active Fault Isolation

    Directory of Open Access Journals (Sweden)

    Xu Feng

    2017-03-01

    Full Text Available In this paper, a fault-tolerant control (FTC scheme is proposed for actuator faults, which is built upon tube-based model predictive control (MPC as well as set-based fault detection and isolation (FDI. In the class of MPC techniques, tubebased MPC can effectively deal with system constraints and uncertainties with relatively low computational complexity compared with other robust MPC techniques such as min-max MPC. Set-based FDI, generally considering the worst case of uncertainties, can robustly detect and isolate actuator faults. In the proposed FTC scheme, fault detection (FD is passive by using invariant sets, while fault isolation (FI is active by means of MPC and tubes. The active FI method proposed in this paper is implemented by making use of the constraint-handling ability of MPC to manipulate the bounds of inputs.

  9. Nonlinear observer output-feedback MPC treatment scheduling for HIV

    Directory of Open Access Journals (Sweden)

    Zurakowski Ryan

    2011-05-01

    Full Text Available Abstract Background Mathematical models of the immune response to the Human Immunodeficiency Virus demonstrate the potential for dynamic schedules of Highly Active Anti-Retroviral Therapy to enhance Cytotoxic Lymphocyte-mediated control of HIV infection. Methods In previous work we have developed a model predictive control (MPC based method for determining optimal treatment interruption schedules for this purpose. In this paper, we introduce a nonlinear observer for the HIV-immune response system and an integrated output-feedback MPC approach for implementing the treatment interruption scheduling algorithm using the easily available viral load measurements. We use Monte-Carlo approaches to test robustness of the algorithm. Results The nonlinear observer shows robust state tracking while preserving state positivity both for continuous and discrete measurements. The integrated output-feedback MPC algorithm stabilizes the desired steady-state. Monte-Carlo testing shows significant robustness to modeling error, with 90% success rates in stabilizing the desired steady-state with 15% variance from nominal on all model parameters. Conclusions The possibility of enhancing immune responsiveness to HIV through dynamic scheduling of treatment is exciting. Output-feedback Model Predictive Control is uniquely well-suited to solutions of these types of problems. The unique constraints of state positivity and very slow sampling are addressable by using a special-purpose nonlinear state estimator, as described in this paper. This shows the possibility of using output-feedback MPC-based algorithms for this purpose.

  10. Development of large size Micromegas detectors for the upgrade of the ATLAS experiments

    CERN Document Server

    Bianco, Michele

    2014-01-01

    The luminosity upgrade of the Large Hadron Collider at CERN f oresees a luminosity increase by a factor 3 compared to the LHC luminosity design value. To c ope with the corresponding rate increase, the Muon System of the ATLAS experiment at CER N needs to be upgraded. In the first station of the high rapidity region, micromegas det ectors have been chosen as the main tracking chambers but will, at the same time, also contribut e to the trigger. We describe the R&D; efforts that led to the construction of the first (1 × 2.4 m 2 ) large micromegas detectors at CERN and outline the next steps towards the construction of the 12 00 m 2 of micromegas detectors for the ATLAS upgrade. The technical solutions, adopted in the c onstruction of the chamber as well as results on the detector performance with cosmic rays are s hown.

  11. AGS intensity upgrades

    International Nuclear Information System (INIS)

    Roser, T.

    1995-01-01

    After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10 13 protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four

  12. Gas box control system for Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Bell, H.H. Jr.; Hunt, A.L.; Clower, C.A. Jr.

    1983-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-U) uses several methods to feed gas (usually deuterium) at different energies into the plasma region of the machine. One is an arrangement of eight high-speed piezo-electric valves mounted on special manifolds (gas box) that feed cold gas directly to the plasma. This paper describes the electronic valve control and data acquisition portions of the gas box, which are controlled by a desk-top computer. Various flow profiles have been developed and stored in the control computer for ready access by the operator. The system uses two modes of operation, one that exercises and characterizes the valves and one that operates the valves with the rest of the experiment. Both the valve control signals and the pressure transducers data are recorded on the diagnostics computer so that they are available for experiment analysis

  13. Prompt photon measurements with the PHENIX MPC-EX detector

    Science.gov (United States)

    Campbell, Sarah

    2013-04-01

    The MPC-EX detector is a preshower extension to PHENIX's Muon Piston Calorimeter (MPC). It consists of eight layers of alternating W absorber and Si mini-pad sensors. Located at forward rapidity, 3.180 GeV, allowing the measurement of prompt photons using the double ratio method. At forward rapidities, prompt photons are dominated by direct photons produced by quark-gluon Compton scattering. In transversely polarized p+p collisions, the prompt photon single spin asymmetry measurement, AN, will resolve the sign discrepancy between the Sivers and twist-3 extractions of AN. In p+Au collisions, the prompt photon RpAu will quantify the level of gluon saturation in the Au nucleus at low-x, 10-3, with a projected systematic error band a factor of four smaller than EPS09's current allowable range. The MPC-EX detector will expand our understanding of gluon nuclear parton distribution functions, providing information about the initial state of heavy ion collisions, and clarify how valence parton's pT and spin correlate to the proton spin.

  14. 75 FR 42292 - List of Approved Spent Fuel Storage Casks: NAC-MPC System, Revision 6

    Science.gov (United States)

    2010-07-21

    ... Fuel Storage Casks: NAC-MPC System, Revision 6 AGENCY: Nuclear Regulatory Commission. ACTION: Direct...-MPC storage system as noted in Appendix B of the Technical Specifications (TS): Incorporation of a... include the following changes to the configuration of the NAC-MPC storage system as noted in Appendix B of...

  15. U.S./Russian cooperative efforts to enhance nuclear MPC ampersand A at VNIITF, (Chelyabinsk-70)

    International Nuclear Information System (INIS)

    Abramson, B; Apt, K; Blasy, J; Bukin, D; Churikov, Y; Curtis, D; Eras, A; Magda, E; Neymotin, L; Shultz, F; Slankas, T; Tittemore, G; Tsygankov, G; Zuev, V.

    1999-01-01

    The work described here is part of an effort called the Nuclear Materials Protection, Control, and Accounting (MPC ampersand A) Program, a cooperative program between the US Department of Eenrgy (DOE) and Russia's Ministry of Atomic Energy (MinAtom). The objective of the program is to reduce the risk of nuclear proliferation by strengthening MPC ampersand A systems at Russian nuclear Facilities. This paper describes that portion of the MPC ampersand A program that is directed specifically to the needs of the All Russian Scientific Research Institute of Technical Physics (VNIITF), also called Chelyabinsk-70. A major MPC ampersand A milestone was met at VNIITF when the MPC ampersand A improvements were commissioned at the Pulse Research Reactor Facility in May of this year

  16. Off-Line Robust Constrained MPC for Linear Time-Varying Systems with Persistent Disturbances

    Directory of Open Access Journals (Sweden)

    P. Bumroongsri

    2014-01-01

    Full Text Available An off-line robust constrained model predictive control (MPC algorithm for linear time-varying (LTV systems is developed. A novel feature is the fact that both model uncertainty and bounded additive disturbance are explicitly taken into account in the off-line formulation of MPC. In order to reduce the on-line computational burdens, a sequence of explicit control laws corresponding to a sequence of positively invariant sets is computed off-line. At each sampling time, the smallest positively invariant set containing the measured state is determined and the corresponding control law is implemented in the process. The proposed MPC algorithm can guarantee robust stability while ensuring the satisfaction of input and output constraints. The effectiveness of the proposed MPC algorithm is illustrated by two examples.

  17. Buildings 104 and 142 Complex Physical Protection and Material Control and Accounting Upgrades at the Mayak Production Association

    International Nuclear Information System (INIS)

    Aichele, Walter T.; Dwyer, Gregory M.; Larsen, R.; Malone, Tim

    2004-01-01

    The Federal State Unitary Enterprise Mayak Production Association (Mayak) and the U.S. Material Protection, Control and Accounting (MPC and A) United States Project Team (USPT) have worked together for a number of years as part of the U.S. national Nuclear Security Administration's (NNSA) MPC and A program to implement both Physical Protection (PP) and Material Control and Accounting (MC and A) upgrades within the Buildings 104 and 142 Complex, a long-term storage area for uranium and plutonium oxide located within Mayak's RT-1 Spent Fuel Reprocessing Plant. This paper focuses on the successes and areas for improvement in the analysis, planning, construction, implementation, and completion of a complex and labor-intensive project aimed at the refurbishment of two existing, in service, long-term special nuclear material (SNM) storage buildings within a Russian SNM production facility

  18. Application of Constrained Linear MPC to a Spray Dryer

    DEFF Research Database (Denmark)

    Petersen, Lars Norbert; Poulsen, Niels Kjølstad; Niemann, Hans Henrik

    2014-01-01

    In this paper we develop a linear model predictive control (MPC) algorithm for control of a two stage spray dryer. The states are estimated by a stationary Kalman filter. A non-linear first-principle engineering model is developed to simulate the spray drying process. The model is validated against...... experimental data and able to precisely predict the temperatures, the air humidity and the residual moisture in the dryer. The MPC controls these variables to the target and reject disturbances. Spray drying is a cost-effective method to evaporate water from liquid foods and produces a free flowing powder...

  19. 75 FR 42339 - List of Approved Spent Fuel Storage Casks: NAC-MPC System, Revision 6

    Science.gov (United States)

    2010-07-21

    ...-2010-0183] RIN 3150--AI88 List of Approved Spent Fuel Storage Casks: NAC-MPC System, Revision 6 AGENCY.... (NAC), NAC-MPC System listing within the ``List of Approved Spent Fuel Storage Casks'' to include... changes to the configuration of the NAC-MPC storage system as noted in Appendix B of the Technical...

  20. Piecewise quadratic Lyapunov functions for stability verification of approximate explicit MPC

    Directory of Open Access Journals (Sweden)

    Morten Hovd

    2010-04-01

    Full Text Available Explicit MPC of constrained linear systems is known to result in a piecewise affine controller and therefore also piecewise affine closed loop dynamics. The complexity of such analytic formulations of the control law can grow exponentially with the prediction horizon. The suboptimal solutions offer a trade-off in terms of complexity and several approaches can be found in the literature for the construction of approximate MPC laws. In the present paper a piecewise quadratic (PWQ Lyapunov function is used for the stability verification of an of approximate explicit Model Predictive Control (MPC. A novel relaxation method is proposed for the LMI criteria on the Lyapunov function design. This relaxation is applicable to the design of PWQ Lyapunov functions for discrete-time piecewise affine systems in general.

  1. Upgrade of the Nuclear Material Protection, Control and Accounting System at the VNIIEF Industrial Zone

    International Nuclear Information System (INIS)

    Lewis, J.C.; Maltsev, V.; Singh, S.P.

    1999-01-01

    The Industrial Zone at the Russian Federal Nuclear Center/All-Russian Scientific Research Institute of Experimental Physics (RFNC/VNEEF) consists of ten guarded areas with twenty two material balance areas (A and As). The type of facilities in the Industrial Zone include storage sites, machine shops, research facilities, and training facilities. Modernization of the Material Protection, Control and Accounting (MPC and A) System at the Industrial Zone started in 1997. This paper provides a description of, the methodology/strategy used in the upgrade of the MFC and A system

  2. TU-FG-201-05: Varian MPC as a Statistical Process Control Tool

    International Nuclear Information System (INIS)

    Carver, A; Rowbottom, C

    2016-01-01

    Purpose: Quality assurance in radiotherapy requires the measurement of various machine parameters to ensure they remain within permitted values over time. In Truebeam release 2.0 the Machine Performance Check (MPC) was released allowing beam output and machine axis movements to be assessed in a single test. We aim to evaluate the Varian Machine Performance Check (MPC) as a tool for Statistical Process Control (SPC). Methods: Varian’s MPC tool was used on three Truebeam and one EDGE linac for a period of approximately one year. MPC was commissioned against independent systems. After this period the data were reviewed to determine whether or not the MPC was useful as a process control tool. Analyses on individual tests were analysed using Shewhart control plots, using Matlab for analysis. Principal component analysis was used to determine if a multivariate model was of any benefit in analysing the data. Results: Control charts were found to be useful to detect beam output changes, worn T-nuts and jaw calibration issues. Upper and lower control limits were defined at the 95% level. Multivariate SPC was performed using Principal Component Analysis. We found little evidence of clustering beyond that which might be naively expected such as beam uniformity and beam output. Whilst this makes multivariate analysis of little use it suggests that each test is giving independent information. Conclusion: The variety of independent parameters tested in MPC makes it a sensitive tool for routine machine QA. We have determined that using control charts in our QA programme would rapidly detect changes in machine performance. The use of control charts allows large quantities of tests to be performed on all linacs without visual inspection of all results. The use of control limits alerts users when data are inconsistent with previous measurements before they become out of specification. A. Carver has received a speaker’s honorarium from Varian

  3. Experience of upgrading existing Russian designed nuclear plants

    International Nuclear Information System (INIS)

    Yanev, P.I.; Facer, R.I.

    1993-01-01

    From the reviewed experiences of upgrading existing Russian designed nuclear plants both of WWER and RBMK type the conclusions drawn are as follows. For the countries operating Russian designed plants it is necessary to adopt a pragmatic approach where all changes must be demonstrated to improve the safety of the plant and safety must be demonstrably improving. Care must be taken to avoid the pitfalls of excessive regulatory demands which are not satisfied and the development of an attitude of disregarding requirements on the basis that they are not enforced. For the lending countries and organizations, it is necessary to ensure that assistance is given to the operating organizations so that the most effective use of funds can be achieved. The experience in the West is that over-regulation and excessive expenditure do not necessarily lead to improved safety. They can lead to significant waste of resources. The use of western technology is recommended but where it is necessary and where it provides the greatest benefit

  4. Low voltage powering of on-detector electronics for HL-LHC experiments upgrades

    CERN Document Server

    Bobillier, Vincent; Vasey, Francois; Karmakar, Sabyasachi; Maity, Manas; Roy, Subhasish; Kundu, Tapas Kumar

    2018-01-01

    All LHC experiments will be upgraded during the next LHC long shutdowns (LS2 and LS3). The increase in resolution and luminosity and the use of more advanced CMOS technology nodes typically implies higher current consumption of the on-detector electronics. In this context, and in view of limiting the cable voltage drop, point-of-load DC-DC converters will be used on detector. This will have a direct impact on the existing powering scheme, implying new AC-DC and/or DC-DC stages as well as changes in the power cabling infrastructure. This paper presents the first results obtained while evaluating different LV powering schemes and distribution layouts for HL-LHC trackers. The precise low voltage power source requirements are being assessed and understood using the CMS tracker upgrade as a use-case.

  5. A frequency domain approach for MPC tuning

    NARCIS (Netherlands)

    Özkan, L.; Meijs, J.B.; Backx, A.C.P.M.; Karimi, I.A.; Srinivasan, R.

    2012-01-01

    This paper presents a frequency domain based approach to tune the penalty weights in the model predictive control (MPC) formulation. The two-step tuning method involves the design of a favourite controller taking into account the model-plant mismatch followed by the controller matching. We implement

  6. A Realistic Process Example for MIMO MPC based on Autoregressive Models

    DEFF Research Database (Denmark)

    Huusom, Jakob Kjøbsted; Jørgensen, John Bagterp

    2014-01-01

    for advanced control design develo pment which may be used by non experts in control theory. This paper presents and illustra tes the use of a simple methodology to design an offset-free MPC based on ARX models. Hence a mecha nistic process model is not required. The forced circulation evaporator by Newell...... and Lee is used to illustrate the offset-free MPC based on ARX models for a nonlinear multivariate process ....

  7. Experiences in controlling the upgrading of TRIGA 2000 Bandung reactor

    International Nuclear Information System (INIS)

    Huda, K.; Wibowo, Y.W.; Suprawhardana, M.S.

    2001-01-01

    TRIGA 2000 Bandung Reactor was established in 1961 for research, education and isotope production purposes. The reactor reached its first criticality in October 1964 and operated at nominal power of 250 kW until 1971. In 1971 the reactor was upgraded to the power level of 1000 kW. In order to raise the capacity of isotope production, the reactor has been upgraded again to the power level of 2000 kW. During the modification of the reactor, the Center for Research and Development of Nuclear Techniques (CRDNT) was management of the reactor as it faced many problems, either technical or non-technical ones. This caused the upgrading activities to take a long time. At this time, the reactor upgrading has almost finished, and the nuclear commissioning is going on. Several aspects and problems associated with the upgrading process have been reviewed and the results are discussed in the present paper. (author)

  8. Technician support for operation and maintenance of large fusion experiments: the tandem mirror experiment upgrade (TMX-U) approach

    International Nuclear Information System (INIS)

    Mattson, G.E.

    1983-01-01

    As experiments continue to grow in size and complexity, a few technicians will no longer be able to maintain and operate the complete experiment. Specialization is becoming the norm. Subsystems are becoming very large and complex, requiring a great deal of experience and training for technicians to become qualified maintenance/operation personnel. Formal in-house and off-site programs supplement on-the-job training to fulfill the qualification criteria. This paper presents the Tandem Mirror Experiment-Upgrade (TMX-U) approach to manpower staffing, some problems encountered, possible improvements, and safety considerations for the successful operation of a large experimental facility

  9. National Spherical Torus Experiment (NSTX) Center Stack Upgrade

    International Nuclear Information System (INIS)

    Neumeyer, C.; Avasarala, S.; Chrzanowski, J.; Dudek, L.; Fan, H.; Hatcher, H.; Heitzenroeder, P.; Menard, J.; Ono, M.; Ramakrishnan, S.; Titus, P.; Woolley, R.; Zhan, H.

    2009-01-01

    The purpose of the NSTX Center Stack Upgrade project is to expand the NSTX operational space and thereby the physics basis for next-step ST facilities. The plasma aspect ratio (ratio of plasma major to minor radius) of the upgrade is increased to 1.5 from the original value of 1.26, which increases the cross sectional area of the center stack by a factor of ∼ 3 and makes possible higher levels of performance and pulse duration.

  10. The High-Luminosity upgrade of the LHC: Physics and Technology Challenges for the Accelerator and the Experiments

    Science.gov (United States)

    Schmidt, Burkhard

    2016-04-01

    In the second phase of the LHC physics program, the accelerator will provide an additional integrated luminosity of about 2500/fb over 10 years of operation to the general purpose detectors ATLAS and CMS. This will substantially enlarge the mass reach in the search for new particles and will also greatly extend the potential to study the properties of the Higgs boson discovered at the LHC in 2012. In order to meet the experimental challenges of unprecedented pp luminosity, the experiments will need to address the aging of the present detectors and to improve the ability to isolate and precisely measure the products of the most interesting collisions. The lectures gave an overview of the physics motivation and described the conceptual designs and the expected performance of the upgrades of the four major experiments, ALICE, ATLAS, CMS and LHCb, along with the plans to develop the appropriate experimental techniques and a brief overview of the accelerator upgrade. Only some key points of the upgrade program of the four major experiments are discussed in this report; more information can be found in the references given at the end.

  11. Operational Experience with Radioactive Source Calibration of the CMS Hadron Endcap Calorimeter Wedges with Phase I Upgrade Electronics

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The Phase I Upgrade of the CMS Hadron Endcap Calorimeters consist of new photodetectors (Silicon Photomultipliers in place of Hybrid Photo-Diodes) and front-end electronics (QIE11). The upgrade will allow the elimination of the high amplitude noise and drifting response of the Hybrid Photo-Diodes, at the same time enabling the mitigation of the radiation damage of the scintillators and the wavelength shifting fibers with a larger spectral acceptance of the Silicon Photomultipliers. The upgrade will also allow to increase the longitudinal segmentation of the readout to be beneficial for pile-up mitigation and recalibration due to depth-dependent radiation damage.As a realistic operational exercise, the responses of the Hadron Endcap Calorimeter wedges are being calibrated with a $^{60}$Co radioactive source both with current and upgrade electronics. The exercise will provide a manifestation of the benefits of the upgrade. Here we describe the instrumentation details and the operational experiences related to t...

  12. Ciphers for MPC and FHE

    DEFF Research Database (Denmark)

    R. Albrecht, Martin; Rechberger, Christian; Schneider, Thomas

    2015-01-01

    that when encrypting larger amounts of data the new design strategy translates into improvements in computation and communication complexity by up to a factor of 5 compared to AES-128, which incidentally is one of the most competitive classical designs. Furthermore, we identify cases where “free XORs” can...... of symmetric-key primitives that minimize the multiplicative size and depth of their descriptions. This is motivated by recent progress in practical instantiations of secure multi-party computation (MPC), fully homomorphic encryption (FHE), and zero-knowledge proofs (ZK) where linear computations are, compared...

  13. Construction and operational experience of the Tandem Mirror Experiment-Upgrade (TMX-U)

    International Nuclear Information System (INIS)

    Chargin, A.K.; Calderon, M.O.; Moore, T.L.

    1983-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-U) incorporates two new features at Lawrence Livermore National Laboratory (LLNL) tandem mirror program, thermal barriers in the end plugs and injection of the neutral beams at several oblique angles. The thermal barriers isolate the electrons in the end plugs from those in the central cell, making it possible to heat them independently with microwaves. In addition, this innovation produces a large potential gradient in the end plugs with lower magnetic fields and lower neutral-beam energies than would be possible in a conventional tandem mirror device. The TMX-U is also designed to test neutral-beam-injection angles as an experimental parameter. We use angles other than 90 0 to produce a plasma with improved microstability

  14. White Paper: Multi-purpose canister (MPC) for DOE-owned spent nuclear fuel (SNF)

    International Nuclear Information System (INIS)

    Knecht, D.A.

    1994-04-01

    The paper examines the issue, What are the advantages, disadvantages, and other considerations for using the MPC concept as part of the strategy for interim storage and disposal of DOE-owned SNF? The paper is based in part on the results of an evaluation made for the DOE National Spent Fuel Program by the Waste Form Barrier/Canister Team, which is composed of knowledgeable DOE and DOE-contractor personnel. The paper reviews the MPC and DOE SNF status, provides criteria and other considerations applicable to the issue, and presents an evaluation, conclusions, and recommendations. The primary conclusion is that while most of DOE SNF is not currently sufficiently characterized to be sealed into an MPC, the advantages of standardized packages in handling, reduced radiation exposure, and improved human factors should be considered in DOE SNF program planning. While the design of MPCs for DOE SNF are likely premature at this time, the use of canisters should be considered which are consistent with interim storage options and the MPC design envelope

  15. Ion cyclotron resonant heating 2 x 1700 loop antenna for the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Brooksby, C.A.; Ferguson, S.W.; Molvik, A.W.; Barter, J.

    1985-01-01

    This paper reviews the mechanical design and improvements that have taken place on the loop type ion cyclotron resonance heating (ICRH) antennas that are located in the center cell region of the Tandem Mirror Experiment-Upgrade (TMX-U)

  16. Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans

    Science.gov (United States)

    Barnes, M. J.; Adraktas, A.; Bregliozzi, G.; Goddard, B.; Ducimetière, L.; Salvant, B.; Sestak, J.; Vega Cid, L.; Weterings, W.; Vallgren, C. Yin

    2017-07-01

    During Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and electrical flashover of the injection kickers. An extensive program of studies was launched and significant upgrades were carried out during Long Shutdown 1 (LS 1). These upgrades included a new design of beam screen to reduce both beam coupling impedance of the kicker magnet and the electric field associated with the screen conductors, hence decreasing the probability of electrical breakdown in this region. This paper presents operational experience of the injection kicker magnets during the first years of Run 2 of the LHC, including a discussion of faults and kicker magnet issues that limited LHC operation. In addition, in light of these issues, plans for further upgrades are briefly discussed.

  17. Upgrade of the Global Muon Trigger for the Compact Muon Solenoid experiment at CERN

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00356020; Widmann, Eberhard

    The Large Hadron Collider is a large particle accelerator at the CERN research laboratory, designed to provide particle physics experiments with collisions at unprecedented centre-of-mass energies. For its second running period both the number of colliding particles and their collision energy were increased. To cope with these more challenging conditions and maintain the excellent performance seen during the first running period, the Level-1 trigger of the Compact Muon Solenoid experiment --- a sophisticated electronics system designed to filter events in real-time --- was upgraded. This upgrade consisted of the complete replacement of the trigger electronics and a full redesign of the system's architecture. While the calorimeter trigger path now follows a time-multiplexed processing model where the entire trigger data for a collision are received by a single processing board, the muon trigger path was split into regional track finding systems where each newly introduced track finder receives data from all th...

  18. Finite Horizon MPC for Systems in Innovation Form

    DEFF Research Database (Denmark)

    Jørgensen, John Bagterp; Huusom, Jakob Kjøbsted; Rawlings, James B.

    2011-01-01

    System identification and model predictive control have largely developed as two separate disciplines. Nevertheless, the major part of industrial MPC commissioning is generation of data and identification of models. In this contribution we attempt to bridge this gap by contributing some of the mi...

  19. Micromegas Detectors for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00211509

    2016-01-01

    Large area Micromegas (MM) detectors will be employed for the Muon Spectrometer upgrade of the ATLAS experiment at the LHC. A total surface of about $150m^2$ of the forward regions of the Muon Spectrometer will be equipped with 8 layers of MM modules. Each module covers a surface area of approximately 2 to $3 m^2$ for a total active area of $1200 m^2$. Together with the small- strips Thin Gap Chambers, they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS Endcap Muon tracking system in the planned 2018/19 shutdown. This upgrade will mantain a low pt threshold for single muons and provides excellent tracking capabilities for the HL-LHC phase. The NSW project requires fully efficient MM chambers with spatial resolution down to $100 \\mu m$, at rate capability up to about $15kHz/cm^2$ and operation in a moderate (highly inhomogeneous) magnetic field up to B=0.3 T. The required tracking capability is provided by the intrinsic spatial resolution combined with a challengi...

  20. Micromegas Detectors for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Bianco, Michele; The ATLAS collaboration

    2015-01-01

    Large area Micromegas (MM) detectors will be employed for the Muon Spectrometer upgrade of the ATLAS experiment at the LHC. A total surface of about 150 m2 of the forward regions of the Muon Spectrometer will be equipped with 8 layers of MM modules. Each module covers a surface area of approximately 2 to 3 m$^{2}$ for a total active area of 1200 m$^{2}$. Together with the small-strips Thin Gap Chambers, they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS Endcap Muon tracking system in the planned 2018/19 shutdown. This upgrade will maintain a low pt threshold for single muons and provides excellent tracking capabilities for the HL- LHC phase. The NSW project requires fully efficient MM chambers with spatial resolution down to 100 $ \\mu m$, a rate capability up to about 15 kHz/cm$^{2}$ and operation in a moderate (highly inhomogeneous) magnetic field up to B=0.3 T. The required tracking capability is provided by the intrinsic spatial resolution combined with a cha...

  1. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  2. Tandem Mirror Experiment Upgrade (TMX-U) overview-recent events

    International Nuclear Information System (INIS)

    Calderon, M.O.; Bell, H.H.

    1985-01-01

    Since its construction and commissioning was completed in the winter of 1981, the Tandem Mirror Experiment Upgrade (TMX-U) has been conducting tandem mirror thermal barrier experiments. The work, following the fall of 1983 when strong plugging with thermal barriers was achieved, has been directed toward controlling radial transport and forming thermal barriers with high density and Beta. This paper describes the overall engineering component of these efforts. Major changes to the machine have included vacuum improvements, changes to the Electron and Ion Cyclotron Resonance Heating systems (ECRH and ICRH), and the installation of a Plasma Potential Control system (PPC) for radial transport reduction. TMX-U operates an extensive diagnostics system that acquires data from 21 types of diagnostic instruments with more than 600 channels, in addition to 246 machine parameters. The changes and additions will be presented. The closing section of this paper will describe the initial study work for a proposed TMX-U octupole configured machine

  3. LHCb PID Upgrade Technical Design Report

    CERN Document Server

    LHCb Collaboration

    2013-01-01

    The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

  4. An Offline Formulation of MPC for LPV Systems Using Linear Matrix Inequalities

    Directory of Open Access Journals (Sweden)

    P. Bumroongsri

    2014-01-01

    Full Text Available An offline model predictive control (MPC algorithm for linear parameter varying (LPV systems is presented. The main contribution is to develop an offline MPC algorithm for LPV systems that can deal with both time-varying scheduling parameter and persistent disturbance. The norm-bounding technique is used to derive an offline MPC algorithm based on the parameter-dependent state feedback control law and the parameter-dependent Lyapunov functions. The online computational time is reduced by solving offline the linear matrix inequality (LMI optimization problems to find the sequences of explicit state feedback control laws. At each sampling instant, a parameter-dependent state feedback control law is computed by linear interpolation between the precomputed state feedback control laws. The algorithm is illustrated with two examples. The results show that robust stability can be ensured in the presence of both time-varying scheduling parameter and persistent disturbance.

  5. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  6. The Material Protection, Control and Accounting Sustainability Program Implementation at the Electrochemical Plant

    International Nuclear Information System (INIS)

    Sirotenko, Vladimir; Antonov, Eduard; Sirotenko, Alexei; Kukartsev, Alexander; Krivenko, Vladimir; Dabbs, Richard D.; Carroll, Michael F.; Garrett, Albert G.; Patrick, Scott W.; Ku, Esther M.

    2008-01-01

    Joint efforts by the Electrochemical Plant (ECP) in Zelenogorsk, Russia, and the United States Department of Energy National Nuclear Security Administration (US DOE/NNSA) Material Protection, Control and Accounting (MPC and A) Program to upgrade ECP security systems began in 1996. The commissioning of major MPC and A systems at ECP occurred in December 2004. Since that time, the US Project Team (USPT) and ECP personnel have focused jointly on the development and implementation of an enterprise-wide MPC and A Sustainability Program (SP) that address the seven essential MPC and A Program sustainability elements. This paper describes current operational experience at the ECP with the full implementation of the site SP utilizing an earned-value methodology. In support of this site program, ECP has established a Document Control Program (DCP) for sustainability-related documents; developed a robust master Work Breakdown Structure (WBS) that outlines all ECP MPC and A sustainability activities; and chartered an Enterprise-Wide Sustainability Working Group (ESWG) The earned value methodology uses ECP-completed (and USPT-verified) analyses to assess project performance on a quarterly basis. The MPC and A SP, presently operational through a contract between ECP and the Los Alamos National Laboratory (LANL), incorporates the seven essential MPC and A Program sustainability elements and governs all sustainability activities associated with MPC and A systems at ECP. The site SP is designed to ensure over the near term the upgraded MPC and A systems continuous operation at ECP as funding transitions from US-assisted to fully Russian supported and sustained

  7. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  8. RF Regional Technical Centers for MPC and A Sustainability Operations

    International Nuclear Information System (INIS)

    Lambert, L D; Toth, W J; Hendrickson, S

    2004-01-01

    The National Nuclear Security Administration (NNSA) programmatic vision to be a catalyst in Russia's assumption of responsibility for long-term system operation is exemplified in the sustainability cooperation with the RF Ministry of Defense (MOD). An identified goal for the MPC and A Program is to encourage the development of Russian Federation (RF) capabilities and commitments to operate and maintain safeguard improvements. The RF MOD Technical Support Center development fulfills the NNSA mission and MPC and A Program goal. The regional technical center concept involves a systematic approach to aid in the determination of the level of sustainability assistance required to transition operators, maintenance, training, and testing of MPC and A systems to the RF MOD. This paper describes the process used to create the RF MOD Technical support center. First are described the needs analyses conducted to determine the key system sustainability factors requiring support. These sustainability functions are then compiled to influence the form and ultimate physical design of the technical support center. Operational interfaces are described, in detail that show the benefit of the center to the individual sites. Finally, benefits relating to information accessibility and other economies of scale are described that highlight the central center concept's strengths

  9. Design and implementation experience of seismic upgrades at Kozloduy and Paks NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Borov, V; Trichkov, V; Alexandrov, A; Jordanov, M [EQE-Bulgaria, Sofia (Bulgaria)

    1995-07-01

    Series of upgrades have been designed and implemented by EQE-Bulgaria at Kozloduy NPP and as a subcontractor of EQE-International - at Paks NPP. Wide variety of facilities have been upgraded, including Electrical Equipment, Control and Instrumentation Equipment, Technological Equipment, Brick Walls and Building Structures. Different design approaches and concepts have been applied in compliance with the specific technological and structural conditions. The effect of the excitation intensity as well as the presence of specific floor response spectra over the upgrading concept and cost is discussed. Specific problems of supporting heavy technological equipment are noted. A practical approach for seismic upgrading of Brick Walls, as well as a tendency for unification of the engineering design is shown. The first completely upgraded Building Structure at Kozloduy NPP is the structure of the Electrical Control Building to the Diesel Generator of the River-bank Pump Station. Specific problems of the implementation of the final upgrading design of the Diesel Generator Building are outlined. (author)

  10. Design and implementation experience of seismic upgrades at Kozloduy and Paks NPPs

    International Nuclear Information System (INIS)

    Borov, V.; Trichkov, V.; Alexandrov, A.; Jordanov, M.

    1995-01-01

    Series of upgrades have been designed and implemented by EQE-Bulgaria at Kozloduy NPP and as a subcontractor of EQE-International - at Paks NPP. Wide variety of facilities have been upgraded, including Electrical Equipment, Control and Instrumentation Equipment, Technological Equipment, Brick Walls and Building Structures. Different design approaches and concepts have been applied in compliance with the specific technological and structural conditions. The effect of the excitation intensity as well as the presence of specific floor response spectra over the upgrading concept and cost is discussed. Specific problems of supporting heavy technological equipment are noted. A practical approach for seismic upgrading of Brick Walls, as well as a tendency for unification of the engineering design is shown. The first completely upgraded Building Structure at Kozloduy NPP is the structure of the Electrical Control Building to the Diesel Generator of the River-bank Pump Station. Specific problems of the implementation of the final upgrading design of the Diesel Generator Building are outlined. (author)

  11. q=1 advanced tokamak experiments in JET and comparison with ASDEX Upgrade

    International Nuclear Information System (INIS)

    Joffrin, E.; Wolf, R.; Alper, B.

    2002-01-01

    The ASDEX Upgrade advanced tokamak scenario with central q close to 1 has been reproduced on JET. For almost identical q profiles, the comparative analysis does show similar features like the fishbone activity and the current profile evolution. In JET, transport analyses indicates that an internal transport barrier (ITB) has been produced. Gradient length criterions based on the ion temperature gradient turbulence stabilization are used to characterize the ITBs in both devices. The trigger of ITBs is associated with rational surfaces in both devices although the underlying physics for this triggering seems different. This experiment has the prospect to get closer to identity experiments between the two tokamaks. (author)

  12. Core heat transfer experiment for JRR-3 to be upgraded at 20 MWt, 2

    International Nuclear Information System (INIS)

    Sudo, Yukio; Miyata, Keiichi; Ikawa, Hiromasa; Ohgawara, Masami; Kaminaga, Masanori

    1985-09-01

    Experiments were carried out to investigate the condition of onset of nucleate boiling (ONB) and the departure from nucleate boiling (DNB) heat flux under forced convection in a vertical rectangular channel, both of which take important roles in the core thermal-hydraulic design of the upgraded JRR-3. This report presents the validity and applicability of the correlations proposed for ONB condition and DNB heat flux, based on the analysis of the experimental results. The upgraded JRR-3 is a low-pressure, low-temperature research reactor and the core heat generation is removed by two cooling modes, one is natural circulation under upflow up to 200 kW and the other is forced circulation under downflow up to 20 MW. Therefore, the difference in heat transfer characteristics between upflow and downflow were investigated in the experiments, which were carried out by using a heated channel properly simulating a subchannel of fuel element because the heat transfer characteristics are considered to be strongly dependent on the configuration of flow channel. (author)

  13. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  14. 75 FR 57841 - List of Approved Spent Fuel Storage Casks: NAC-MPC System, Revision 6, Confirmation of Effective...

    Science.gov (United States)

    2010-09-23

    ... Spent Fuel Storage Casks: NAC-MPC System, Revision 6, Confirmation of Effective Date AGENCY: Nuclear... amended the NRC's spent fuel storage regulations at 10 CFR 72.214 to revise the NAC-MPC System listing to... configuration of the NAC-MPC storage system by the incorporation of a single closure lid with a welded closure...

  15. Model Predictive Control Based on System Re-Identification (MPC-SRI) to Control Bio-H2 Production from Biomass

    Science.gov (United States)

    Wahid, A.; Taqwallah, H. M. H.

    2018-03-01

    Compressors and a steam reformer are the important units in biohydrogen from biomass plant. The compressors are useful for achieving high-pressure operating conditions while the steam reformer is the main process to produce H2 gas. To control them, in this research used a model predictive control (MPC) expected to have better controller performance than conventional controllers. Because of the explicit model empowerment in MPC, obtaining a better model is the main objective before employing MPC. The common way to get the empirical model is through the identification system, so that obtained a first-order plus dead-time (FOPDT) model. This study has already improved that way since used the system re-identification (SRI) based on closed loop mode. Based on this method the results of the compressor pressure control and temperature control of steam reformer were that MPC based on system re-identification (MPC-SRI) has better performance than MPC without system re-identification (MPCWSRI) and the proportional-integral (PI) controller, by % improvement of 73% against MPCWSRI and 75% against the PI controller.

  16. Computational Efficiency of Economic MPC for Power Systems Operation

    DEFF Research Database (Denmark)

    Standardi, Laura; Poulsen, Niels Kjølstad; Jørgensen, John Bagterp

    2013-01-01

    In this work, we propose an Economic Model Predictive Control (MPC) strategy to operate power systems that consist of independent power units. The controller balances the power supply and demand, minimizing production costs. The control problem is formulated as a linear program that is solved...

  17. Securing budget for and implementing your significant simulator upgrade: The Fermi experience

    International Nuclear Information System (INIS)

    Crone, B.D.

    2006-01-01

    Detroit Edison has selected CAE to perform a total simulator upgrade (with the exception of the panel hardware and I/O system) of the Fermi 2 station simulator. The upgrade is intended to improve the performance of the simulator (and thus training effectiveness) while reducing associated operating costs by utilizing an industry standard operating platform, software applications, and off the shelf PC based computer hardware. Additionally, the upgrade is intended to provide the ability to conduct classroom presentations through the use of desktop simulators. Because the cost of a total upgrade is considerable, substantial work is necessary to convince site management that such an undertaking is necessary, can be performed efficiently, and that a return on investment is even possible. This effort was compounded by the lingering history of a previous simulator upgrade, which was completed considerably over-budget and beyond the intended Ready for Training date. As of this writing, the Fermi 2 Simulator Upgrade using CAE products is approximately 60% complete. This paper will describe the methods used to procure funding, as well as steps taken following funding approval to keep the project on track for successful completion. (author)

  18. ECRH experiments in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Guenter, S.; Hobirk, J.; Kirov, K.; Ryter, F.; Wolf, R.; Zohm, H.; Gantenbein, G.

    2001-01-01

    In ASDEX Upgrade ECRH and ECCD with a power of up to 2 MW has been used. With counter ECCD in discharges with an internal transport barrier we achieved an electron temperature of ≅13 keV. In low density ohmic plasmas we obtained an rf driven current of ≅80% both in co- and counter directions. Neoclassical tearing modes have been completly stabilised by driving a current on the resonant q-surface. Electron heat transport has been studied in standard L- and H-mode plasmas and can be described by a dependence on a critical electron temperature gradient

  19. LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hennessy, Karol

    2017-02-11

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1}. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm{sup 2} pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  20. MPC-based auto-tuned PID controller for the steam generator water level

    International Nuclear Information System (INIS)

    Na, Man Gyun

    2001-01-01

    In this work, proportional-integral-derivative (PID) control gains are automatically tuned by using a model predictive control (MPC) method. The MPC has received much attention as a powerful tool for the control of industrial process systems. An MPC-based PID controller can be derived from the second order linear model of a process. The steam generator is usually described by the well-known 4 th order linear model which consists of the mass capacity, reverse dynamics and mechanical oscillations terms. But the important terms in this linear model are the mass capacity and reverse dynamics terms, both of which can be described by a 2 nd order linear system. The proposed auto-tuned PID controller was applied to a linear model of steam generators. The parameters of a linear model for steam generators are very different according to the power levels. The proposed controller showed good performance for the water level deviation and sudden steam flow disturbances that are typical in the existing power plants by changing only the input-weighting factor according to the power level

  1. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  2. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  3. Forestry application of the AHP by use of MPC software

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Rodriguez, F.; Rojo-Alboreca, A.

    2012-07-01

    We present an example of the application of the AHP decision-making approach to forest management, by use of MPC 2.0 software. The example considered is that of a forest services company interested in buying a timber harvester. The company had preselected four different machines as possible alternatives, and established 11 different criteria involved in the decision, grouped into four categories (economic, environmental, social and technical). The decision-making process was undertaken using MPC 2.0 software tools, which enable establishment of criteria on two levels, independent pairwise comparison of criteria (first phase) and of alternatives under each criterion (second phase), repetition of the decision-making process by the same or different users, graphical display of the results on the computer screen, and sensitivity analysis. (Author) 28 refs.

  4. The Belgian experience on the backfitting and safety upgrading of old operating nuclear power plants

    International Nuclear Information System (INIS)

    Brognon, T.

    1993-01-01

    The paper describes the methodology for backfitting and safety upgrading during the reevaluation of the Belgian NPP's: first generation (Doel-1, Doel-2, Tihange-1) and second generation plants (Doel-3, Doel-4, Tihange-2 and Tihange-3). A list of essential safety subjects and topics is given. The experience has proved the feasibility of a safety upgrading of operating NPP without injury to its availability, the benefit of a close cooperation between owner, engineering company and safety authorities throughout the project. A global approach to solving numerous specific deficiencies along with the optimization of the investments regarding the safety improvement of the NPP is suggested. Further increase of the know-how will be achieved through the present Belgian programme along with similar activities abroad. (R.I.)

  5. Layer-by-layer assembled magnetic prednisolone microcapsules (MPC) for controlled and targeted drug release at rheumatoid arthritic joints

    Energy Technology Data Exchange (ETDEWEB)

    Prabu, Chakkarapani [Department of Pharmaceutical Technology & Centre for Excellence in Nanobio Translational Research, Anna University, Bharathidasan Institute of Technology Campus, Tiruchirappalli, Tamil Nadu (India); Latha, Subbiah, E-mail: lathasuba2010@gmail.com [Department of Pharmaceutical Technology & Centre for Excellence in Nanobio Translational Research, Anna University, Bharathidasan Institute of Technology Campus, Tiruchirappalli, Tamil Nadu (India); Selvamani, Palanisamy [Department of Pharmaceutical Technology & Centre for Excellence in Nanobio Translational Research, Anna University, Bharathidasan Institute of Technology Campus, Tiruchirappalli, Tamil Nadu (India); Ahrentorp, Fredrik; Johansson, Christer [Acreo Swedish ICT AB, Arvid Hedvalls Backe 4, Göteborg (Sweden); Takeda, Ryoji; Takemura, Yasushi [Electrical & Computer Engineering & Faculty of Engineering Division of Intelligent Systems Engineering, Yokohama National University (Japan); Ota, Satoshi [Department of Electrical and Electronic Engineering, Shizuoka University (Japan)

    2017-04-01

    We report here in about the formulation and evaluation of Magnetic Prednisolone Microcapsules (MPC) developed in order to improve the therapeutic efficacy relatively at a low dose than the conventional dosage formulations by means of magnetic drug targeting and thus enhancing bioavailability at the arthritic joints. Prednisolone was loaded to poly (sodium 4-styrenesulfonate) (PSS) doped calcium carbonate microspheres confirmed by the decrease in surface area from 97.48 m{sup 2}/g to 12.05 of m{sup 2}/g by BET analysis. Adsorption with oppositely charged polyelectrolytes incorporated with iron oxide nanoparticles was confirmed through zeta analysis. Removal of calcium carbonate core yielded MPC with particle size of ~3.48 µm, zeta potential of +29.7 mV was evaluated for its magnetic properties. Functional integrity of MPC was confirmed through FT-IR spectrum. Stability studies were performed at 25 °C±65% relative humidity for 60 days showed no considerable changes. Further the encapsulation efficiency of 63%, loading capacity of 18.2% and drug release of 88.3% for 36 h and its kinetics were also reported. The observed results justify the suitability of MPC for possible applications in the magnetic drug targeting for efficient therapy of rheumatoid arthritis. - Highlights: • Development of magnetic prednisolone microcapsules (MPC). • Physicochemical, pharmaceutical and magnetic properties of MPC were characterized. • Multiple layers of alternative polyelectrolytes prolonged prednisolone release time. • MPC is capable for targeted and sustained release rheumatoid arthritis therapy.

  6. Upgradation of Apsara reactor

    International Nuclear Information System (INIS)

    Mammen, S.; Mukherjee, P.; Bhatnagar, A.; Sasidharan, K.; Raina, V.K.

    2009-01-01

    Apsara is a 1 MW swimming pool type research reactor using high enriched uranium as fuel with light water as coolant and moderator. The reactor is in operation for more than five decades and has been extensively used for basic research, radioisotope production, neutron radiography, detector testing, shielding experiments etc. In view of its long service period, it is planned to carry out refurbishment of the reactor to extend its useful life. During refurbishment, it is also planned to upgrade the reactor to a 2 MW reactor to improve its utilization and to upgrade the structure, system and components in line with the current safety standards. This paper gives a brief account of the design features and safety aspects of the upgraded Apsara reactor. (author)

  7. Diagnostic system for EUV radiation measurements from dense xenon plasma generated by MPC

    International Nuclear Information System (INIS)

    Petrov, Yu.V.; Garkusha, I.E.; Solyakov, D.G.; Marchenko, A.K.; Chebotarev, V.V.; Ladygina, M.S.; Staltsov, V.V.; Yelisyeyev, D.V.; Hassanein, A.

    2011-01-01

    Magnetoplasma compressor (MPC) of compact geometry has been designed and tested as a source of EUV radiation. In present paper diagnostic system for registration of EUV radiation is described. It was applied for radiation measurements in different operation modes of MPC. The registration system was designed on the base of combination of different types of AXUV photodiodes. Possibility to minimize the influence of electrons and ions flows from dense plasma stream on AXUV detector performance and results of the measurements has been discussed.

  8. Early Termination of Dantzig-Wolfe Algorithm for Economic MPC

    DEFF Research Database (Denmark)

    Standardi, Laura; Sokoler, Leo Emil; Poulsen, Niels Kjølstad

    2013-01-01

    In this paper we apply the Economic Model Predictive Control (MPC) for balancing the power supply and demand in the future power systems in the most economic way. The control problem is formulated as a linear program, having a block-angular structure solved by the implementation of the Dantzig...

  9. Randomized Crossover Comparison of Personalized MPC and PID Control Algorithms for the Artificial Pancreas.

    Science.gov (United States)

    Pinsker, Jordan E; Lee, Joon Bok; Dassau, Eyal; Seborg, Dale E; Bradley, Paige K; Gondhalekar, Ravi; Bevier, Wendy C; Huyett, Lauren; Zisser, Howard C; Doyle, Francis J

    2016-07-01

    To evaluate two widely used control algorithms for an artificial pancreas (AP) under nonideal but comparable clinical conditions. After a pilot safety and feasibility study (n = 10), closed-loop control (CLC) was evaluated in a randomized, crossover trial of 20 additional adults with type 1 diabetes. Personalized model predictive control (MPC) and proportional integral derivative (PID) algorithms were compared in supervised 27.5-h CLC sessions. Challenges included overnight control after a 65-g dinner, response to a 50-g breakfast, and response to an unannounced 65-g lunch. Boluses of announced dinner and breakfast meals were given at mealtime. The primary outcome was time in glucose range 70-180 mg/dL. Mean time in range 70-180 mg/dL was greater for MPC than for PID (74.4 vs. 63.7%, P = 0.020). Mean glucose was also lower for MPC than PID during the entire trial duration (138 vs. 160 mg/dL, P = 0.012) and 5 h after the unannounced 65-g meal (181 vs. 220 mg/dL, P = 0.019). There was no significant difference in time with glucose PID control for the AP indicates that MPC performed particularly well, achieving nearly 75% time in the target range, including the unannounced meal. Although both forms of CLC provided safe and effective glucose management, MPC performed as well or better than PID in all metrics. © 2016 by the American Diabetes Association. Readers may use this article as long as the work is properly cited, the use is educational and not for profit, and the work is not altered.

  10. Robust Economic MPC for a Power Management Scenario with Uncertainties

    DEFF Research Database (Denmark)

    Hovgaard, Tobias Gybel; Larsen, Lars F.S.; Jørgensen, John Bagterp

    2011-01-01

    This paper presents a novel incorporation of probabilistic constraints and Second Order Cone Programming (SOCP) with Economic Model Predictive Control (MPC). Hereby the performance of the controller is robustyfied in the presence of both model and forecast uncertainties. Economic MPC is a receding...... horizon controller that minimizes an economic objective function and we have previously demonstrated its usage to include a refrigeration system as a controllable power consumer with a portfolio of power generators such that total cost is minimized. The main focus for our work is the power management...... an optimal solution to an infeasible or very expensive solution. The main contribution of this paper is the Finite Impulse Response (FIR) formulation of the system models allowing us to describe and handle model uncertainties in the framework of probabilistic constraints. Our new solution using this setup...

  11. ATLAS Upgrade Programme

    CERN Document Server

    Hillier, S J; The ATLAS collaboration

    2012-01-01

    With the already outstanding LHC luminosity performance, and planned LHC upgrades in the upcoming shutdowns, it is expected that within a short time-scale, the general purpose LHC experiments will have to cope with luminosities beyond their original design. In order to maintain detector performance and sensitivity to expected and new physics processes, ATLAS has defined a continuous upgrade programme which foresees staged enhancements during the next 10 years of operation, and then more widespread changes before the transition to the highest luminosities after 2022. This talk will describe several components of the ATLAS upgrade, focusing in particular on the Inner Detector and Trigger. The Inner Detector faces two challenges in the higher luminosity environment: high particle multiplicities and increased radiation dose. These will be addressed in the short term by a new layer of Pixel detectors, and in the long term by a complete replacement. The Trigger faces an increasingly difficult task of distinguishing...

  12. Further results on "Robust MPC using Linear Matrix Inequalities"

    NARCIS (Netherlands)

    Lazar, M.; Heemels, W.P.M.H.; Munoz de la Pena, D.; Alamo, T.

    2008-01-01

    This paper presents a novel method for designing the terminal cost and the auxiliary control law (ACL) for robust MPC of uncertain linear systems, such that ISS is a priori guaranteed for the closed-loop system. The method is based on the solution of a set of LMIs. An explicit relation is

  13. The LHCb VELO upgrade

    International Nuclear Information System (INIS)

    Rodríguez Pérez, Pablo

    2013-01-01

    LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to 2×10 33 cm −2 s −1 and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to 5×10 15 1 MeV n eq /cm 2 in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55×55μm 2 pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results

  14. Circular waveguide systems for electron-cyclotron-resonant heating of the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Felker, B.; Calderon, M.O.; Chargin, A.K.

    1983-01-01

    Extensive use of electron cyclotron resonant heating (ECRH) in the Tandem Mirror Experiment-Upgrade (TMX-U) requires continuous development of components to improve efficiency, increase reliability, and deliver power to new locations with respect to the plasma. We have used rectangular waveguide components on the experiment and have developed, tested, and installed circular waveguide components. We replaced the rectangular with the circular components because of the greater transmission efficiency and power-handling capability of the circular ones. Design, fabrication, and testing of all components are complete for all systems. In this paper we describe the design criteria for the system

  15. An MPC approach to individual pitch control of wind turbines using uncertain LIDAR measurements

    DEFF Research Database (Denmark)

    Mirzaei, Mahmood; Soltani, Mohsen; Poulsen, Niels Kjølstad

    2013-01-01

    wind turbine in the full load region is considered. Model predictive control (MPC) is used to solve the problem. A new approach is proposed to simplify the optimization problem of MPC. We linearize the obtained nonlinear model for different operating points which are determined by the effective wind...... speed on the rotor disc and take the wind speed as a scheduling variable. The wind speed is measurable ahead of the turbine using LIDARs, therefore the scheduling variable is known for the entire prediction horizon. We consider uncertainty in the wind propagation, which is the traveling time of wind...... from the LIDAR measurement point to the rotor. An algorithm based on wind speed estimation and measurements from the LIDAR is devised to find an estimate of the delay and compensate for it before it is used in the controller. Comparisons between the MPC with error compensation, without error...

  16. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  17. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the luminosity will have increased 5-fold compared to the design luminosity (1034 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional luminosity increase by a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to u...

  18. Confirmation of MRS/MPC transfer facility sizing using simulation modeling

    International Nuclear Information System (INIS)

    Houston, E.S.; Hadley, J.D.

    1994-01-01

    The Nuclear Waste Policy Act (NWPA) of 1982, as amended, requires the Department of Energy to begin receiving spent nuclear fuel (SNF) from utilities in January 1998. A repository will not be completed in time for the scheduled receipt of SNF. A Monitored Retrievable Storage (MRS) Facility is therefore a feasible solution to bridge the gap between the 1998 date for fuel acceptance and the startup of the repository. SNF will be stored temporarily at the MRS and later retrieved from storage and shipped to the repository. To simplify fuel handling and to standardize components, the multi-purpose canister (MPC) concept was investigated. The MPC would be a sealed, metallic canister containing multiple SNF assemblies in a dry inert environment. MPCs would be placed into different overpacks for transportation, storage, and disposal at the repository. The MRS transfer facility MPC and SNF throughput requirements, assumptions, and operating concepts were used to initially determine the size of the facility and the major equipment contained within the facility. This initial estimate was based on simplified calculation techniques. The adequacy of the design configurations were then confirmed using SLAM simulation modeling software. Modeling incorporates uncertainties in task durations, the effects of equipment reliability, availability of personnel and equipment, and system breakdowns. This paper describes how the model was developed and how it is used to verify the transfer facility size. It also illustrates how problems with the facility design, operational concepts, and staffing are identified with the results of the model

  19. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  20. Surface grafting density analysis of high anti-clotting PU-Si-g-P(MPC) films

    Energy Technology Data Exchange (ETDEWEB)

    Lu Chunyan [Jiangsu Key Laboratory of Biofunctional Materials, College of Chemistry and Materials Science, Nanjing Normal University, Nanjing 210097 (China); Jiangsu Engineering Research Center for Biomedical Function Materials, Nanjing Normal University, Nanjing 210097 (China); Zhou Ninglin, E-mail: ninglinzhou@yahoo.com [Jiangsu Key Laboratory of Biofunctional Materials, College of Chemistry and Materials Science, Nanjing Normal University, Nanjing 210097 (China); Jiangsu Engineering Research Center for Biomedical Function Materials, Nanjing Normal University, Nanjing 210097 (China); Jiangsu Technological Research Center for Interfacial Chemistry and Chemical Engineering, Nanjing University, Nanjing 210093 (China); Xiao Yinghong; Tang Yida; Jin Suxing; Wu Yue [Jiangsu Key Laboratory of Biofunctional Materials, College of Chemistry and Materials Science, Nanjing Normal University, Nanjing 210097 (China); Jiangsu Engineering Research Center for Biomedical Function Materials, Nanjing Normal University, Nanjing 210097 (China); Zhang Jun; Shen Jian [Jiangsu Key Laboratory of Biofunctional Materials, College of Chemistry and Materials Science, Nanjing Normal University, Nanjing 210097 (China); Jiangsu Engineering Research Center for Biomedical Function Materials, Nanjing Normal University, Nanjing 210097 (China); Jiangsu Technological Research Center for Interfacial Chemistry and Chemical Engineering, Nanjing University, Nanjing 210093 (China)

    2012-02-01

    Well-defined zwitterionic polymer brushes with good blood compatibility were studied, grafted from polyurethane (PU) substrate (PU-Si-g-P(MPC)) by surface-initiated reverse atom transfer radical polymerization (SI-RATRP). We found that the structure of polymer brushes and hence their properties greatly depend on the grafting density. To solve the problems of the normal method for grafting density measurement, i.e., more requirements for qualified and proficient instrument operator, we established an effective and feasible way instead of the conventional method of spectroscopic ellipsometer combined with gel permeation chromatograph (ELM/GPC) to calculate the grafting density of PU-Si-g-P(MPC) films by using a software named ImageJ 1.44e in combination with scanning electronic microscope (SEM) or atomic microscope (AFM). X-ray photoelectron spectroscopy (XPS), SEM and AFM were employed to analyze the surface topography and changes of elements before and after graft modification of the synthetic PU-Si-g-P(MPC) biofilms.

  1. Physical, thermal and mechanical study of MPC formulated with LG-MgO incorporating Phase Change Materials as admixture

    Science.gov (United States)

    Maldonado-Alameda, A.; Lacasta, A. M.; Giro-Paloma, J.; Chimenos, J. M.; Formosa, J.

    2017-10-01

    The high environmental impact generated by using of Ordinary Portland Cement (OPC) has lead to the search for alternative materials in the field of civil and building engineering. In addition, there is a tendency to develop cements from industrial by-products, thus reducing pollution and emissions generated by their production. One of the best positioned cements to compete with OPC is Magnesium Phosphate Cement (MPC). The present work studies different dosages of MPC mortars formulated with low-grade MgO by-product (sustainable MPC) incorporating Microencapsulated Phase Change Materials (MPCM) and air entraining additive (AEA) as admixtures (Thermal Sustainable MPC) to improve the thermal behaviour of the material. The aim is developed a new eco-friendly material that leads to reducing energy consumption in buildings. The study is focused on the physical, thermal, and mechanical characterization of TS-MPC mortars to assess their potential use as a thermal prefabricated panel. The results allow to relate the amount of the MPCM and the additive percentage with the thermal and mechanical properties of the TS- MPC. Furthermore, is important to highlight the influence of MPCM not only in the thermal behaviour but also on the increase of the porosity. The experimental results show that the addition of both additives contributes substantially to the improvement of the thermal behaviour of the mortars and converts them on a suitable material to reduce thermal oscillations in buildings.

  2. J-PARC accelerator and neutrino beamline upgrade programme

    Science.gov (United States)

    Friend, M.

    2017-09-01

    The 30 GeV proton beam from the J-PARC Main Ring (MR) accelerator is used to produce a world-class conventional neutrino beam - the neutrino source for the J-PARC long-baseline neutrino programme, including the current T2K experiment and proposed future experiments. Planned upgrades to increase the beam power of the MR from the current ˜400 kW to the design power of 750 kW and beyond, to 1.3+ MW, are underway. These include hardware modifications, such as upgrades of the MR magnet power supplies, RF systems, and feedback systems, as well as a change of the MR beam betatron tune point. Upgrades to the neutrino beamline, such as to the proton beam monitoring, horns, and radioactive material handling, will also be required to accommodate the increased proton beam power. An overview of planned J-PARC MR and neutrino facility upgrades is given.

  3. MPC-SVM method for Vienna rectifier with PMSG used in Wind Turbine Systems

    DEFF Research Database (Denmark)

    Lee, June-Seok; Bak, Yeongsu; Lee, Kyo-Beum

    2016-01-01

    Using a Vienna rectifier as the machine-side rectifier of back-to-back converter is advantageous in terms of size and cost compared to three-level topologies and for this reason, the Vienna rectifier has been used in Wind Turbine Systems (WTS). This paper proposes a Model Predictive Control (MPC......) method for the Vienna rectifier used in WTS with a Permanent Magnet Synchronous Generator (PMSG). The proposed MPC method considers the feasible eight-voltage vectors of the Vienna rectifier. In addition, the voltage vectors, which are the center voltage vectors of two feasible adjacent voltage vectors...

  4. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  5. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  6. Tracking in the trigger from the CDF experience to CMS upgrade

    CERN Document Server

    Palla, F

    2007-01-01

    Precise tracking information in the online selection of interesting physics events is extremely beneficial at hadron colliders. The CDF experiment at the Tevatron, has shown for the first time the impact of the tracking in triggers, allowing to achieve unprecedented precision in B-physics measurements. The CMS experiment at LHC will largely make use of tracking information at high level trigger, after the Level-1 acceptance. The increased luminosity of the Super-LHC collider will impose to CMS a drastic revision of the Level-1 trigger strategy, incorporating the tracker information at the first stage of the selection. After a review of the CDF and CMS approaches we will discuss several possible Level-1 tracker based concepts for the upgraded CMS detector at Super-LHC. One approach is based on associative memories, which has already been demonstrated in CDF. It makes use of binary readout in the front end electronics, followed by transfer of the full granularity data off detector using optical links to dedicat...

  7. Biocontrol of Late Blight (Phytophthora capsici Disease and Growth Promotion of Pepper by Burkholderia cepacia MPC-7

    Directory of Open Access Journals (Sweden)

    Mao Sopheareth

    2013-03-01

    Full Text Available A chitinolytic bacterial strain having strong antifungal activity was isolated and identified as Burkholderia cepacia MPC-7 based on 16S rRNA gene analysis. MPC-7 solubilized insoluble phosphorous in hydroxyapatite agar media. It produced gluconic acid and 2-ketogluconic acid related to the decrease in pH of broth culture. The antagonist produced benzoic acid (BA and phenylacetic acid (PA. The authentic compounds, BA and PA, showed a broad spectrum of antimicrobial activity against yeast, several bacterial and fungal pathogens in vitro. To demonstrate the biocontrol efficiency of MPC-7 on late blight disease caused by Phytophthora capsici, pepper plants in pot trials were treated with modified medium only (M, M plus zoospore inoculation (MP, MPC-7 cultured broth (B and B plus zoospore inoculation (BP. With the sudden increase in root mortality, plants in MP wilted as early as five days after pathogen inoculation. However, plant in BP did not show any symptom of wilting until five days. Root mortality in BP was markedly reduced for as much as 50%. Plants in B had higher dry weight, P concentration in root, and larger leaf area compared to those in M and MP. These results suggested that B. cepacia MPC-7 should be considered as a candidate for the biological fertilizer as well as antimicrobial agent for pepper plants.

  8. A Dantzig-Wolfe Decomposition Algorithm for Linear Economic MPC of a Power Plant Portfolio

    DEFF Research Database (Denmark)

    Standardi, Laura; Edlund, Kristian; Poulsen, Niels Kjølstad

    2012-01-01

    Future power systems will consist of a large number of decentralized power producers and a large number of controllable power consumers in addition to stochastic power producers such as wind turbines and solar power plants. Control of such large scale systems requires new control algorithms....... In this paper, we formulate the control of such a system as an Economic Model Predictive Control (MPC) problem. When the power producers and controllable power consumers have linear dynamics, the Economic MPC may be expressed as a linear program and we apply Dantzig-Wolfe decomposition for solution...

  9. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  10. DOE Lab-to-Lab MPC ampersand A workshop for cooperative tasks with Russian institutes: Focus on critical assemblies and item facilities

    International Nuclear Information System (INIS)

    Bieber, A.M. Jr.; Fishbone, L.G.; Kato, W.Y.; Lazareth, O.W.; Suda, S.C.; Garcia, D.; Haga, R.

    1995-01-01

    Seventeen Russian scientists and engineers representing five different institutes participated in a Workshop on material control and accounting as part of the US-Russian Lab-to-Lab Cooperative Program in Nuclear Materials Protection, Control, and Accounting (MPC ampersand A). In addition to presentations and discussions, the Workshop included an exercise at Brookhaven National Laboratory (BNL) and demonstrations at the Zero Power Physics Reactor (critical-assembly facility) of Argonne National Laboratory-West (ANL-W). The Workshop particularly emphasized procedures for physical inventory-taking at critical assemblies and item facilities, with associated supporting techniques and methods. By learning these topics and applying the methods and experience at their own institutes, the Russian scientists and engineers will be able to determine and verify nuclear material inventories based on sound procedures, including measurements. This will constitute a significant enhancement to MPC ampersand A at the Russian institutes

  11. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  12. AREVA 10x10 BWR fuel experience feedback and on going upgrading

    International Nuclear Information System (INIS)

    Lippert, Hans Joachim; Rentmeister, Thomas; Garner, Norman; Tandy, Jay; Mollard, Pierre

    2008-01-01

    Established with engineering and manufacturing operations in the US and Europe, AREVA NP has been and is supplying nuclear fuel assemblies and associated core components to boiling water reactors worldwide, representing today more than 63 000 fuel assemblies. The evolution of BWR fuel rod arrays from early 6x6 designs to the 10x10 designs first introduced in the mid 1990's yielded significant improvements in thermal mechanical operating limits, critical power level, cold shutdown margin, discharge burnup, as well as other key operational capabilities. Since first delivered in 1992, ATRIUM T M 1 0 fuel assemblies have now been supplied to a total of 32 BWR plants in the US, Europe, and Asia resulting in an operating experience over 20 000 fuel assemblies. This article presents in detail the operational experience consolidated by these more than 20 000 ATRIUM T M 1 0 BWR assemblies already supplied to utilities. Within the different 10x10 fuel assemblies available, the Fuel Assembly design is chosen and tailored to the operating strategies of each reactor. Among them, the latest versions of ATRIUM T M a re ATRIUM T M 1 0XP and ATRIUM T M 1 0XM fuel assemblies which have been delivered to several utilities worldwide. The article details key aspects of ATRIUM T M 1 0 fuel assemblies in terms of reliability and performance. Special attention is paid to key proven features, ULTRAFLOW T M s pacer grids, the use of part length fuel rods (PLFRs) and their geometrical optimization, water channel and load chain, upgraded features available for inclusion with most advanced designs. Regular upgrading of the product has been made possible thanks to a continuous improvement process with the aim of further upgrading BWR fuel assembly performance and reliability. Regarding thermal mechanical behavior of fuel rods, chromia (Cr2O3) doped fuel pellets, described in Reference 1, well illustrate this improvement strategy to reduce fission gas release, increase power thresholds for PCI

  13. The magnet power control system for the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Bell, H.H.

    1983-01-01

    This paper describes the desktop computer/CAMAC based system that controls the power source for the Tandem Mirror Experiment-Upgrade (TMX-U) magnet power system. Presently it contains 42 dc rectifier power supplies connected to 24 magnet coils arranged in 17 circuits. During each shot, the system delivers 22.6 MW dc to the magnets for about 3 s. The system is presently being changed to add six power supplies, two solenoidal throttle coils, and two reverse C-coils. When complete, the delivered power will increase to 36.9 MW. The closed-loop control system usually provides current (and thus, magnetic field) that is within 1% of the requested current. Achieving this accuracy required using grounding, shielding, and isolation methods to reduce noise and related problems

  14. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade was performed during the Extended Year End Technical Stop of 2016 and 2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  15. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    Science.gov (United States)

    Bilki, B.; Onel, Y.

    2018-03-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I Upgrade was performed during the Extended Year End Technical Stop of 2016-2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  16. LLNL Tandem Mirror Experiment (TMX) upgrade vacuum system

    International Nuclear Information System (INIS)

    Pickles, W.L.; Chargin, A.K.; Drake, R.P.

    1981-01-01

    TMX Upgrade is a large, tandem, magnetic-mirror fusion experiment with stringent requirements on base pressure (10 -8 torr), low H reflux from the first walls, and peak gas pressure (5 x 10 -7 torr) due to neutral beam gas during plasma operation. The 225 m 3 vacuum vessel is initially evacuated by turbopumps. Cryopumps provide a continuous sink for gases other than helium, deuterium, and hydrogen. The neutral beam system introduces up to 480 l/s of H or D. The hydrogen isotopes are pumped at very high speed by titanium sublimed onto two cylindrical radially separated stainless steel quilted liners with a total surface area of 540 m 2 . These surfaces (when cooled to about 80 0 K) provide a pumping speed of 6 x 10 7 l/s for hydrogen. The titanium getter system is programmable and is used for heating as well as gettering. The inner plasma liner can be operated at elevated temperatures to enhance migration of gases away from the surfaces close to the plasma. Glow discharge cleaning is part of the pumpdown procedure. The design features are discussed in conjunction with the operating procedures developed to manage the dynamic vacuum conditions

  17. Bohunice V-1. Review of safety upgrading and operating experiences

    International Nuclear Information System (INIS)

    Korec, J.; Kuschel, D.

    2000-01-01

    The Bohunice site in the Slovak Republic has two Russian-designed twin-unit nuclear power plants, one equipped with reactors of the WWER 440/230 type, the other with type WWER 440/213 reactors. Two older units (V-1) started commercial operation in late 1978 and 1980 respectively and have been supplying electricity to the national grid since that time without any events that could have degraded plant safety level. In the period prior to 1990 the utility Slovenske Elektrarne (S.E.) performed extensive modifications and upgrades to the original design of the two older units V-1 NPP. Furthermore, significant steps in safety improvement for Bohunice NPP V-1 have been made since 1990. Following the political restructuring of the former Czechoslovakia and the country's new open-door policy towards western organizations, several international expert missions were focused on evaluation of Bohunice NPP safety status level and operational reliability, particularly targeting the two older units. Based on recommendations of individual expert missions and complementary deterministic and probabilistic safety analyses performed by S.E., the Czechoslovak Nuclear Regulatory Authority issued the Resolution No. 5/91 defining 81 measures concerning further safety and reliability improvement of Bohunice V1 .A range of short-term and long-term upgrades was prioritised in terms of importance to plant safety and work to implement these measures commenced in the early nineties. During the 'Small Reconstruction' from 1991 to 1993 some of the short term upgrading measures were realized to eliminate the most serious safety deficits, thus to achieve a significant reduction in core damage frequency and a major improvement in confinement integrity. In this paper and presentation the goals of the gradual reconstruction project, basic engineering, detailed engineering and realization, last major stage of Unit 2 upgrade, as well as final stage of Unit 1 upgrade in early 2000 are presented

  18. Commissioning of Upgrade Forward Hadron Calorimeters of CMS

    CERN Document Server

    Bilki, Burak

    2016-01-01

    The CMS experiment at the Large Hadron Collider (LHC) at CERN is upgrading the photo-detection and readout system of the forward hadron calorimeter (HF). During Long Shutdown 1, all of the original PMTs were replaced with multi-anode, thin window photomultipliers. At the same time, the back-end readout system was upgraded to micro-TCA readout. Here we report on the experience with commissioning and calibrating the HF front-end as well as the online operational challenges of the micro-TCA system.

  19. Designing Structure-Dependent MPC-Based AGC Schemes Considering Network Topology

    Directory of Open Access Journals (Sweden)

    Young-Sik Jang

    2015-04-01

    Full Text Available This paper presents the important features of structure-dependent model predictive control (MPC-based approaches for automatic generation control (AGC considering network topology. Since power systems have various generators under different topologies, it is necessary to reflect the characteristics of generators in power networks and the control system structures in order to improve the dynamic performance of AGC. Specifically, considering control system structures is very important because not only can the topological problems be reduced, but also a computing system for AGC in a bulk-power system can be realized. Based on these considerations, we propose new schemes in the proposed controller for minimizing inadvertent line flows and computational burden, which strengthen the advantages of MPC-based approach for AGC. Analysis and simulation results in the IEEE 39-bus model system show different dynamic behaviors among structure-dependent control schemes and possible improvements in computational burden via the proposed control scheme while system operators in each balancing area consider physical load reference ramp constraints among generators.

  20. Tuning of methods for offset free MPC based on ARX model representations

    DEFF Research Database (Denmark)

    Huusom, Jakob Kjøbsted; Poulsen, Niels Kjølstad; Jørgensen, Sten Bay

    2010-01-01

    In this paper we investigate model predictive control (MPC) based on ARX models. ARX models can be identified from data using convex optimization technologies and is linear in the system parameters. Compared to other model parameterizations this feature is an advantage in embedded applications...... for robust and automatic system identification. Standard MPC is not able to reject a sustained, unmeasured, non zero mean disturbance and will therefore not provide offset free tracking. Offset free tracking can be guaranteed for this type of disturbances if Δ variables are used or if the state space...... is extended with a disturbance model state. The relation between the base case and the two extended methods are illustrated which provides good understanding and a platform for discussing tuning for good closed loop performance....

  1. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Oreglia, M; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The main upgrade will occur for the High Luminosity LHC phase (phase 2) which is scheduled around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to use will be decided after extensive test beam studies. High speed optical links are used to read out all digitized data to the counting room. For the off-detector electronics a new back-end architecture is being developed, including the initial trigger processing and pipeline memories. A demonstrator prototype read-out for a slice of the ...

  2. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    AUTHOR|(CDS)2072874

    2014-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Facing the new challenges posed by the upcoming increases of the LHC beam energy and luminosity, and from the experience of the previous running, a series of upgrades is planned for L1Calo. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. The contribution gives an overview of the existing system and the lessons learned during the first period of LHC data taking. Based on these, the...

  3. Energy upgrading measures improve also indoor climate

    DEFF Research Database (Denmark)

    Foldbjerg, Peter; Knudsen, Henrik Nellemose

    2014-01-01

    A new survey shows that the economy is what motivates Danish owners of single-family houses the most to start energy upgrading, and that improved indoor climate is also an important factor. After the upgrading, homeowners experience both improved economy and indoor climate. In a strategy...... to increase the number of homeowners who venture into a major energy upgrading of their house, the demonstrated positive side effects, more than energy savings, should be included in the communication to motivate homeowners. The barriers should be reduced by “taking the homeowners by the hand” and helping...... them to choose relevant energy-saving solutions as well as clarifying the financial consequences and opportunities....

  4. Modelling and experiments on NTM stabilisation at ASDEX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Urso, Laura

    2009-07-27

    In the next fusion device ITER the so-called neoclassical tearing modes (NTMs) are foreseen as being extremely detrimental to plasma confinement. This type of resistive instability is related to the presence in the plasma of magnetic islands. These are experimentally controlled with local electron cyclotron current drive (ECCD) and the island width decay during NTM stabilisation is modelled using the so-called Modified Rutherford equation. In this thesis, a modelling of the Modified Rutherford equation is carried out and simulations of the island width decay are compared with the experimentally observed ones in order to fit the two free machine-independent parameters present in the equation. A systematic study on a database of NTM stabilisation discharges from ASDEX Upgrade and JT-60U is done within the context of a multi-machine benchmark for extrapolating the ECCD power requirements for ITER. The experimental measurements in both devices are discussed by means of consistency checks and sensitivity analysis and used to evaluate the two fitting parameters present in the Modified Rutherford equation. The influence of the asymmetry of the magnetic island on stabilisation is for the first time included in the model and the effect of ECCD on the marginal island after which the mode naturally decays is quantified. The effect of radial misalignment and over-stabilisation during the experiment are found to be the key quantities affecting the NTM stabilisation. As a main result of this thesis, the extrapolation to ITER of the NTM stabilisation results from ASDEX Upgrade and JT-60U shows that 10MW of ECCD power are enough to stabilise large NTMs as long as the O-point of the island and the ECCD beam are perfectly aligned. In fact, the high ratio between the island size at saturation and the deposition width of the ECCD beam foreseen for ITER is found to imply a maximum allowable radial misalignment of 2-3 cm and little difference in terms of gained performance between

  5. Modelling and experiments on NTM stabilisation at ASDEX upgrade

    International Nuclear Information System (INIS)

    Urso, Laura

    2009-01-01

    In the next fusion device ITER the so-called neoclassical tearing modes (NTMs) are foreseen as being extremely detrimental to plasma confinement. This type of resistive instability is related to the presence in the plasma of magnetic islands. These are experimentally controlled with local electron cyclotron current drive (ECCD) and the island width decay during NTM stabilisation is modelled using the so-called Modified Rutherford equation. In this thesis, a modelling of the Modified Rutherford equation is carried out and simulations of the island width decay are compared with the experimentally observed ones in order to fit the two free machine-independent parameters present in the equation. A systematic study on a database of NTM stabilisation discharges from ASDEX Upgrade and JT-60U is done within the context of a multi-machine benchmark for extrapolating the ECCD power requirements for ITER. The experimental measurements in both devices are discussed by means of consistency checks and sensitivity analysis and used to evaluate the two fitting parameters present in the Modified Rutherford equation. The influence of the asymmetry of the magnetic island on stabilisation is for the first time included in the model and the effect of ECCD on the marginal island after which the mode naturally decays is quantified. The effect of radial misalignment and over-stabilisation during the experiment are found to be the key quantities affecting the NTM stabilisation. As a main result of this thesis, the extrapolation to ITER of the NTM stabilisation results from ASDEX Upgrade and JT-60U shows that 10MW of ECCD power are enough to stabilise large NTMs as long as the O-point of the island and the ECCD beam are perfectly aligned. In fact, the high ratio between the island size at saturation and the deposition width of the ECCD beam foreseen for ITER is found to imply a maximum allowable radial misalignment of 2-3 cm and little difference in terms of gained performance between

  6. Zambia's participation in past CTBTO activities and the upgrading of AS119 and N192: Experiences and the way forward

    International Nuclear Information System (INIS)

    Lombe, D.K.

    2002-01-01

    This presentation briefly describes the Zambian Seisimic Network (ZSN), Zambia's participation in past CTBTO activities and upgrading of AS119 and N192. It goes on to describe various experiences encountered and makes some suggestions for future considerations

  7. Integration of RTO and MPC in the Hydrogen Network of a Petrol Refinery

    Directory of Open Access Journals (Sweden)

    Cesar de Prada

    2017-01-01

    Full Text Available This paper discusses the problems associated with the implementation of Real Time Optimization/Model Predictive Control (RTO/MPC systems, taking as reference the hydrogen distribution network of an oil refinery involving eighteen plants. This paper addresses the main problems related to the operation of the network, combining data reconciliation and a RTO system, designed for the optimal generation and redistribution of hydrogen, with a predictive controller for the on-line implementation of the optimal policies. This paper describes the architecture of the implementation, showing how RTO and MPC can be integrated, as well as the benefits obtained in terms of improved information about the process, increased hydrocarbon load to the treatment plants and reduction of the hydrogen required for performing the operations.

  8. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade is being performed during the Extended Year End Technical Stop of 2016 â?? 2017. In the framework of the upgrade, the PMT boxes are being reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics is also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to eliminate the background to have an effect on the trigger. Following this major upgrade, the Hadron Forward Calorimeters will be commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  9. Experiences From Developing and Upgrading a Web-Based Surveillance System for Malaria Elimination in Cambodia.

    Science.gov (United States)

    Fu, Clementine; Lopes, Sérgio; Mellor, Steve; Aryal, Siddhi; Sovannaroth, Siv; Roca-Feltrer, Arantxa

    2017-06-14

    Strengthening the surveillance component is key toward achieving country-wide malaria elimination in Cambodia. A Web-based upgraded malaria information system (MIS) was deemed to essentially act as the central component for surveillance strengthening. New functionality (eg, data visualization) and operational (eg, data quality) attributes of the system received particular attention. However, building from the lessons learned in previous systems' developments, other aspects unique to Cambodia were considered to be equally important; for instance, feasibility issues, particularly at the field level (eg, user acceptability at various health levels), and sustainability needs (eg, long-term system flexibility). The Cambodian process of identifying the essential changes and critical attributes for this new information system can provide a model for other countries at various stages of the disease control and elimination continuum. Sharing these experiences not only facilitates the establishment of "best practices" but also accelerates global and regional malaria elimination efforts. In this article, Cambodia's experience in developing and upgrading its MIS to remain responsive to country-specific needs demonstrates the necessity for considering functionality, operationalization, feasibility, and sustainability of an information system in the context of malaria elimination. ©Clementine Fu, Sérgio Lopes, Steve Mellor, Siddhi Aryal, Siv Sovannaroth, Arantxa Roca-Feltrer. Originally published in JMIR Public Health and Surveillance (http://publichealth.jmir.org), 14.06.2017.

  10. Overview of MPC applications in supply chains: Potential use and benefits in the management of forest-based supply chains

    Directory of Open Access Journals (Sweden)

    Tatiana M. Pinho

    2015-12-01

    Full Text Available Aim of study: This work aims to provide an overview of Model Predictive Controllers (MPC applications in supply chains, to describe the forest-based supply chain and to analyse the potential use and benefits of MPC in a case study concerning a biomass supply chain.Area of study: The proposed methods are being applied to a company located in Finland.Material and methods: Supply chains are complex systems where actions and partners’ coordination influence the whole system performance. The increase of competitiveness and need of quick responses to the costumers implies the use of efficient management techniques. The control theory, particularly MPC, has been successfully used as a supply chain management tool. MPC is able to deal with dynamic interactions between the partners and to globally optimize the supply chain performance in the presence of disturbances. However, as far as is authors’ knowledge, there are no applications of this methodology in the forest-based supply chains. This work proposes a control architecture to improve the performance of the forest supply chain. The controller is based on prediction models which are able to simulate the system and deal with disturbances.Main results: The preliminary results enable to evaluate the impacts of disturbances in the supply chain. Thus, it is possible to react beforehand, controlling the schedules and tasks’ allocation, or alert the planning level in order to generate a new plan.Research highlights:   Overview of MPC applications in supply chains; forest-based supply chain description; case study presentation: wood biomass supply chain for energy production; MPC architecture proposal to decrease the operation times.Keywords: biomass; forest; Model Predictive Control; planning; supply chain.

  11. Experience with the upgraded VERONA-u WWER-440 core monitoring system

    International Nuclear Information System (INIS)

    Lux, I.; Vegh, J.; Adorjan, F.; Buerger, L.

    1994-01-01

    The paper describes the components, functioning and services of the VERONA-u core monitoring system recently installed at Unit 2 and 3 of the Hungarian Paks NPP. The VERONA-u is a totally upgraded and modernized version of the previous VERONA system, in the upgrading project the data-concentrator, the host computer and the operators' displays were replaced by state-of-the-art hardware and software components. Dual hardware redundancy and automatic function recovery actions were introduced in order to ensure high system availability. The man-machine interface has been redesigned completely, applying X Windows as Graphical User Interface. Improved core analysis and power reconstruction methods were introduced, together with a detailed hot-spot monitoring algorithm. A capable archivation module ensures periodic logging of all measured data, change sensitive storage of important signal changes and provides sophisticated post-mortem analysis tools. The upgraded system has been working satisfactorily on Unit 2 for a complete fuel cycle by now, the on-line system response in complex, transient situations is illustrated in the paper. (author). 10 refs, 4 figs

  12. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  13. Dynamic modeling and explicit/multi-parametric MPC control of pressure swing adsorption systems

    KAUST Repository

    Khajuria, Harish

    2011-01-01

    Pressure swing adsorption (PSA) is a flexible, albeit complex gas separation system. Due to its inherent nonlinear nature and discontinuous operation, the design of a model based PSA controller, especially with varying operating conditions, is a challenging task. This work focuses on the design of an explicit/multi-parametric model predictive controller for a PSA system. Based on a system involving four adsorbent beds separating 70% H2, 30% CH4 mixture into high purity hydrogen, the key controller objective is to fast track H2 purity to a set point value of 99.99%. To perform this task, a rigorous and systematic framework is employed. First, a high fidelity detailed dynamic model is built to represent the system\\'s real operation, and understand its dynamic behavior. The model is then used to derive appropriate linear models by applying suitable system identification techniques. For the reduced models, a model predictive control (MPC) step is formulated, where latest developments in multi-parametric programming and control are applied to derive a novel explicit MPC controller. To test the performance of the designed controller, closed loop simulations are performed where the dynamic model is used as the virtual plant. Comparison studies of the derived explicit MPC controller are also performed with conventional PID controllers. © 2010 Elsevier Ltd. All rights reserved.

  14. Developments towards the LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Cid Vidal, Xabier, E-mail: xabier.cid.vidal@cern.ch

    2016-09-21

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019–2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb{sup −1}. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign. - Highlights: • The VELO is the detector surrounding the LHCb collision point. • After its upgrade, the VELO will be capable of reading out at a rate of 40 MHz. • The detector will be composed of Si pixel sensors, read out by the VeloPix ASIC. • The irradiated prototype sensors for the VELO upgrade are currently being tested.

  15. The LHCb RICH Upgrade: Development of the DCS and DAQ system.

    CERN Multimedia

    Cavallero, Giovanni

    2018-01-01

    The LHCb experiment is preparing for an upgrade during the second LHC long shutdown in 2019-2020. In order to fully exploit the LHC flavour physics potential with a five-fold increase in the instantaneous luminosity, a trigger-less readout will be implemented. The RICH detectors will require new photon detectors and a brand new front-end electronics. The status of the integration of the RICH photon detector modules with the MiniDAQ, the prototype of the upgraded LHCb readout architecture, has been reported. The development of the prototype of the RICH Upgrade Experiment Control System, integrating the DCS and DAQ partitions in a single FSM, has been described. The status of the development of the RICH Upgrade Inventory, Bookkeeping and Connectivity database has been reported as well.

  16. Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade

    International Nuclear Information System (INIS)

    Thomas Powers; Davis, G.; Michael Drury; Christiana Grenoble; Hovater, J.; Lawrence King; Tomasz Plawski; Joseph Preble

    2005-01-01

    Three cryomodules have been designed and built as intermediate prototypes for the CEBAF 12 GeV upgrade. This paper will discuss the commissioning and operational experience with the second of these cryomodules, which was installed and commissioned in the Jefferson Lab 10 kW Free Electron Laser Facility. Within the cryomodule are eight 7-cell, 1497 MHz cavities. It was designed to accelerate 1 mA of beam in excess of 70 MV and to have the same footprint as a standard CEBAF cryomodule. The cryomodule was installed in parallel with the FEL beam line in the spring of 2004 and characterized simultaneous with beam delivery. It was installed in the beam line in the early summer of 2004 and has since been operated as part of an energy recovered linac with 5 mA of beam current and 75 MV accelerating gradient for extended periods of time. Additionally, it was operated at 1 mA of beam current and 80 MV of accelerating gradient for several hours without a trip. In the latter operating mode the beam current was limited by the injector setup

  17. Experiences with tungsten coatings in high heat flux tests and under plasma load in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Herrmann, A; Greuner, H; Fuchs, J C; Marne, P de; Neu, R

    2009-01-01

    ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/2008 exploring tungsten as a first wall material in tokamaks. In the first phase, the heating power was restricted to 10 MW. It was increased to 15 MW in the second phase. During this operational period, a delamination of the 200 μm W-VPS coating happened at 2 out of 128 tiles of the outer divertor and an unscheduled opening was required. In the third phase, ASDEX Upgrade was operated with partly predamaged tiles and up to 15 MW heating power. The target load was actively controlled by N 2 -seeding. This paper presents the screening test of target tiles in the high heat flux test facility GLADIS, experiences with operation and detected damages of the outer divertor as well as the heat load to the outer divertor and the reasons for the toroidal asymmetry of the divertor load.

  18. Operation status and upgrading of HIRFL

    International Nuclear Information System (INIS)

    Tang, J.Y.; Wang, Y.F.; Wei, B.W.

    2001-01-01

    The operation status and the undergoing upgrading at HIRFL machine are presented. The accelerated ion species with the machine have been expanding, including metallic ions and higher energy with the new ECR ion source. The upgrading of HIRFL as the pre-accelerator of CSR storage ring has been processing steadily. The new 14.5 GHz ECR ion source has been put in operation in early 1999. A full-superconducting ECR ion source of 18 GHz is under design. The manufacture of the new vacuum chamber for SFC is just finished and the installation is to be started. The construction of the new B1 buncher is nearly to be finished, and the off-line test and the installation will be started soon. Another two identical bunchers will be ordered after the test. The beam distribution system is under upgrading to make all experiment stations separate from the others and the time-sharing mode possible, and a new cancer-therapy station is also under construction. The other upgrading items include the yoke enlarging of SFC, beam diagnostics, computer control and beam distribution system

  19. Immobilization of poly(MPC) brushes onto titanium surface by combining dopamine self-polymerization and ATRP: Preparation, characterization and evaluation of hemocompatibility in vitro

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Wenyong; Yang, Ping; Li, Jingan; Li, Shiqi; Li, Peichuang; Zhao, Yuancong, E-mail: Zhaoyc7320@163.com; Huang, Nan

    2015-09-15

    Graphical abstract: The functional surface containing rich amino and hydroxyl groups was obtained by simple and easily dopamine self-polymerization. Poly (MPC) brushes were successfully immobilized on titanium surface by combining acylation reaction and ATRP. This chemical and biomimetic modified titanium surface effectively inhibits platelet adhesion and activation. - Highlights: • Polydopamine coating provides amino and hydroxyl groups for second reactivity. • Poly(MPC) brushes covalently immobilized on coating by surface initiated ATRP. • In vitro hemocompatibility of biomimetic modified Ti was better than unmodified. - Abstract: Poly(2-methacryloyloxyethyl phosphorylcholine(MPC)) has been studied in many biomedical fields because of good biocompatibility, such as hemocompatibility, inhibiting protein adhesion, antifouling, and so on. To achieve good hemocompatibility of titanium (Ti) surface, bio-inspired poly(MPC) brushes were grafted from Ti substrate covalently. In this work, the surface of Ti was first coated with polydopamine, and got a surface bearing −NH{sub 2} and −OH groups which could be bridged with poly(MPC) via atom transfer radical polymerization. Water contact angle decreased to 51.3° when titanium grafted with poly(MPC) brushes. The data of Infrared Spectroscopy and X-ray photoelectron spectroscopy (XPS) indicated that poly(MPC) was successfully grafted onto the surface of titanium. Platelet-rich plasma (PRP) adhesion test and lactate dehydrogenase (LDH) assay showed that the number of platelets adhered on the surface of modified-titanium was much less than that of unmodified titanium and platelets did not aggregate and distort. Thus, the simple and chemical method of immobilization of poly(MPC) brushes has potential application for improving hemocompatibility for cardiovascular stent and some other biomaterials.

  20. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  1. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  2. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    International Nuclear Information System (INIS)

    Pandya, Kaushal; Bansal, Gourab; Soni, Jignesh

    2015-01-01

    ROBIN (Replica Of BATMAN source in India) is a replica of BATMAN source of IPP, Garching. Plasma production (inductively coupled, RF produced plasma), plasma diagnostic (langmuir probe, optical emission spectroscopy), negative ion beam extraction in volume mode with reduced extraction area of 2 cm 2 (4 apertures) using small bench top type power supply (10kV, 400mA), with increase extraction area of 73 cm 2 (146 apertures) and using actual power supplies (Extraction Power Supply System, EPSS (11kV, 35A), and Accelerator Power Supply System, APSS (35kV, 15A)) and beam diagnostic etc have been performed successfully in ROBIN. This paper will describe the details of the system upgradation for surface mode negative ion experiments and its performance in ROBIN

  3. A brief account of Kozloduy 6 full-scope replica control room simulator upgrade experience: An engineering point of view

    International Nuclear Information System (INIS)

    Dinkov, Y.D.

    2006-01-01

    A short excursion throughout Kozloduy NPP history, and Kozloduy 6 Full-Scope Replica Control Room Simulator procurement, is proposed for a reader, which is not familiar with the Kozloduy circumstances. A brief account of five year operation and upgrade experience is presented as seen by the Kozloduy simulator engineering team. During the last five years Kozloduy 6 is going through a complex and expensive modernization programme so Simulator is a subject of a series of changes twice per year. Simulator is used for training six months of the year during spring and autumn most of this time in two shifts daily. Remaining six months during winter and summer are allocated to other simulator uses including five months downtime for hardware reconstruction, software integration, troubleshooting and testing. Quantitative information concerning scope of software and hardware changes is given. Kozloduy NPP simulator engineering team approach toward various upgrade projects is given in an attempt to facilitate a discussion about how a simulator upgrade should be performed. Projects mentioned vary from small to big, in-house or contracted, already completed or planned for future realization

  4. Analysis of an ACC System for Sliding Mode and MPC under Transitional Manoeuvers

    Directory of Open Access Journals (Sweden)

    Zeeshan Ali Memon

    2012-10-01

    Full Text Available Two different control algorithms, sliding mode and MPC (Model Predictive Control are employed to analyse the performance of a linear vehicle model equipped with an ACC (Adaptive Cruise Control system. Both controllers are analysed under critical TM (Transitional Maneuvers to investigate their suitability for the ACC system. The simulation results, for the same scenario, from both controllers\\' approach have been compared. The results show that the MPC is more robust than the SMC (Sliding Model Controller. The results show that the SMC algorithm is not suitable for the proposed vehicle model. The shortcomings of the SMC have been highlighted and the comparisons are made with the previous studies. The proposed approach can be useful for the selection of the appropriate controller for the given application.

  5. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  6. Upgrading the BEPC control system

    International Nuclear Information System (INIS)

    Yang Liping; Wang Lizheng; Liu Shiyao

    1992-01-01

    The BEPC control system has been put into operation and operated normally since the end of 1987. Three years's experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages araised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc.. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DEC net and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance. (author)

  7. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  8. MAPS development for the ALICE ITS upgrade

    OpenAIRE

    Yang, P; Aglieri, G; Cavicchioli, C; Chalmet, P L; Chanlek, N; Collu, A; Gao, C; Hillemanns, H; Junique, A; Kofarago, M; Keil, M; Kugathasan, T; Kim, D; Kim, J; Lattuca, A

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging senso...

  9. Robust event-triggered MPC with guaranteed asymptotic bound and average sampling rate

    NARCIS (Netherlands)

    Brunner, F.D.; Heemels, W.P.M.H.; Allgower, F.

    2017-01-01

    We propose a robust event-triggered model predictive control (MPC) scheme for linear time-invariant discrete-time systems subject to bounded additive stochastic disturbances and hard constraints on the input and state. For given probability distributions of the disturbances acting on the system, we

  10. ATLAS pixel IBL modules construction experience and developments for future upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Gaudiello, A.

    2015-10-01

    The first upgrade of the ATLAS Pixel Detector is the Insertable B-Layer (IBL), installed in May 2014 in the core of ATLAS. Two different silicon sensor technologies, planar n-in-n and 3D, are used. Sensors are connected with the new generation 130 nm IBM CMOS FE-I4 read-out chip via solder bump-bonds. Production quality control tests were set up to verify and rate the performance of the modules before integration into staves. An overview of module design and construction, the quality control results and production yield will be discussed, as well as future developments foreseen for future detector upgrades.

  11. LHCb - SALT, a dedicated readout chip for strip detectors in the LHCb Upgrade experiment

    CERN Multimedia

    Swientek, Krzysztof Piotr

    2015-01-01

    Silicon strip detectors in the upgraded Tracker of LHCb experiment will require a new readout 128-channel ASIC called SALT. It will extract and digitise analogue signals from the sensor, perform digital processing and transmit serial output data. SALT is designed in CMOS 130 nm process and uses a novel architecture comprising of analogue front-end and ultra-low power ($<$0.5 mW) fast (40 MSps) sampling 6-bit ADC in each channel. A prototype of first 8-channel version of SALT chip, comprising all important functionalities, was submitted. Its design and possibly first tests results will be presented.

  12. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  13. Einstein SSS+MPC observations of Seyfert type galaxies

    Science.gov (United States)

    Holt, S. S.; Turner, T. J.; Mushotzky, R. F.; Weaver, K.

    1989-01-01

    The X-ray spectra of 27 Seyfert galaxies measured with the Solid State Spectrometer (SSS) onboard the Einstein Observatory is investigated. This new investigation features the utilization of simultaneous data from the Monitor Proportional Counter (MPC) and automatic correction for systematic effects in the SSS. The new results are that the best-fit single power law indices agree with those previously reported, but that soft excesses are inferred for at least 20 percent of the measured spectra. The soft excesses are consistent with either an approximately 0.25 keV black body or Fe-L line emission.

  14. Snowflake divertor configuration studies for NSTX-Upgrade

    International Nuclear Information System (INIS)

    Soukhanovskii, V.A.

    2011-01-01

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  15. Upgrade of the Proton West secondary beamline

    International Nuclear Information System (INIS)

    Spiegel, L.

    1989-01-01

    As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p + /π + or p - /π - , were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs

  16. DOE FES FY2017 Joint Research Target Fourth Quarter Milestone Report for theNational Spherical Torus Experiment Upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Soukhanovskii, V. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-09-13

    A successful high-performance plasma operation with a radiative divertor has been demonstrated on many tokamak devices, however, significant uncertainty remains in accurately modeling detachment thresholds, and in how detachment depends on divertor geometry. Whereas it was originally planned to perform dedicated divertor experiments on the National Spherical Tokamak Upgrade to address critical detachment and divertor geometry questions for this milestone, the experiments were deferred due to technical difficulties. Instead, existing NSTX divertor data was summarized and re-analyzed where applicable, and additional simulations were performed.

  17. Multiprocessor systems for real-time data acquisition on the Asdex upgrade and future plasma experiments

    International Nuclear Information System (INIS)

    Zilker, M.; Hallatschek, K.; Heimann, P.; Hertweck, F.

    1999-01-01

    In this paper we present our transputer-based multitop multiprocessor systems for data acquisition, which are currently used on the Asdex upgrade experiment. The bandwidth of these systems goes from low-speed like the calorimetry diagnostic up to highspeed and large data volume systems like the soft-X-ray and Mirnov diagnostics, which collect several hundreds of megabytes of data during a plasma discharge of ∼8 s. Further, we present the multitop-MX, a newly developed system based on transputers and powerPCs, which provides real-time facilities for analysing the acquired data, to generate necessary information for the dynamic adaptation of sample rates, and to deliver triggers when certain events in the plasma are detected. The algorithm running on the powerPCs performs a wavelet like time-frequency transform. In the last part we give an outlook how to build the next generation of data acquisition systems to be used on the future plasma experiments W7-X and ITER, but also on Asdex upgrade. The hardware of these new distributed systems should be mainly based on established industry standards like the VME-bus, PCI-bus and FiberChannel, but also emerging technologies like SCI (scalable coherent interconnect) should be considered. The systems software should be well designed with object oriented methods to simplify the maintenance process and to enable further expansions and adaptations to new problems in an easy way. (orig.)

  18. Upgraded coal interest group. Quarterly report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Weber, W. [Electric Power Research Inst., Chattanooga, TN (United States); Lebowitz, H.E. [Fossil Fuel Sciences, Palo Alto, CA (United States)

    1995-12-31

    The objectives of the Upgraded Coal Interest Group (UCIG) are as follows: Review and update the status of various coal upgrading technologies and developments and critically assess the results. Perform engineering screening analyses on various coal upgrading approaches. Perform commercialization analyses that will promote the availability and use of upgraded coal products by quantifying the benefits of using them. Identify market opportunities for introduction of upgraded coals. Perform critical analyses on a variety of coals and technologies in areas important to users but not readily available. Perform critical experiments which will show the differences between technologies.

  19. Optimal control of inverted pendulum system using PID controller, LQR and MPC

    Science.gov (United States)

    Varghese, Elisa Sara; Vincent, Anju K.; Bagyaveereswaran, V.

    2017-11-01

    Inverted pendulum is a highly nonlinear system. Here we propose an optimal control technique for the control of an inverted Pendulum - cart system. The system is modeled, linearized and controlled. Here, the control objective is to control the system such that when the cart reaches a desired position the inverted pendulum stabilizes in the upright position. Initially PID controller is used to control the system. Later, Linear Quadratic Regulator (LQR) a well-known optimal control technique which makes use of the states of the dynamical system and control input to frame the optimal control decision is used. Various combinations of both PID and LQR controllers are implemented. To validate the robustness of the controller, the system is simulated with and without disturbance. Finally the system is also controlled using Model Predictive controller (MPC). MPC has well predictive ability to calculate future events and implement necessary control actions. The performance of the system is compared and analyzed.

  20. X-ray crystal spectrometer upgrade for ITER-like wall experiments at JET

    Energy Technology Data Exchange (ETDEWEB)

    Shumack, A. E., E-mail: amy.shumack@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); FOM Institute DIFFER, P.O. Box 1207, NL-3430 BE Nieuwegein (Netherlands); Rzadkiewicz, J. [National Centre for Nuclear Research, Andrzeja Sołtana 7, 05-400 Otwock (Poland); Chernyshova, M.; Czarski, T.; Karpinski, L. [Institute of Plasma Physics and Laser Microfusion, Hery 23, 01-497 Warsaw (Poland); Jakubowska, K. [Institute of Plasma Physics and Laser Microfusion, Hery 23, 01-497 Warsaw (Poland); Université Bordeaux, CNRS, CEA, CELIA, UMR 5107, F-33405 Talence (France); Scholz, M. [Institute of Nuclear Physics PAN, ul. Radzikowskiego 152, 31-342 Kraków (Poland); Byszuk, A.; Cieszewski, R.; Kasprowicz, G.; Pozniak, K.; Wojenski, A.; Zabolotny, W. [Institute of Electronic Systems, Warsaw University of Technology, 00-665 Warsaw (Poland); Dominik, W. [Faculty of Physics, Institute of Experimental Physics, Warsaw University, 00-681 Warsaw (Poland); Conway, N. J.; Dalley, S.; Tyrrell, S.; Zastrow, K.-D. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Figueiredo, J. [EFDA-CSU, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Associação EURATOM/IST, Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Av Rovisco Pais, 1049-001 Lisbon (Portugal); and others

    2014-11-15

    The high resolution X-Ray crystal spectrometer at the JET tokamak has been upgraded with the main goal of measuring the tungsten impurity concentration. This is important for understanding impurity accumulation in the plasma after installation of the JET ITER-like wall (main chamber: Be, divertor: W). This contribution provides details of the upgraded spectrometer with a focus on the aspects important for spectral analysis and plasma parameter calculation. In particular, we describe the determination of the spectrometer sensitivity: important for impurity concentration determination.

  1. Review of the Tandem Mirror Experiment-Upgrade (TMX-U) machine-parameter-instrumentation system

    International Nuclear Information System (INIS)

    Kane, R.J.; Coffield, F.E.; Coutts, G.W.; Hornady, R.S.

    1983-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-U) machine consists of seven major machine subsystems: magnet system, neutral beam system, microwave heating (ECRH), ion heating (ICRH), gas fueling, stream guns, and vacuum system. Satisfactory performance of these subsystems is necessary to achieve the experimental objectives planned for TMX-U operations. Since the performance quality of the subsystem is important and can greatly affect plasma parameters, a 233-channel instrumentation system has been installed. Data from the instrumentation system are acquired and stored with the plasma diagnostic information. Thus, the details of the machine performance are available during post-shot analysis. This paper describes all the machine-parameter-instrumentation hardware, presents some typical data, and outlines how the data are used

  2. Novel Formulation of Adaptive MPC as EKF Using ANN Model: Multiproduct Semibatch Polymerization Reactor Case Study.

    Science.gov (United States)

    Kamesh, Reddi; Rani, Kalipatnapu Yamuna

    2017-12-01

    In this paper, a novel formulation for nonlinear model predictive control (MPC) has been proposed incorporating the extended Kalman filter (EKF) control concept using a purely data-driven artificial neural network (ANN) model based on measurements for supervisory control. The proposed scheme consists of two modules focusing on online parameter estimation based on past measurements and control estimation over control horizon based on minimizing the deviation of model output predictions from set points along the prediction horizon. An industrial case study for temperature control of a multiproduct semibatch polymerization reactor posed as a challenge problem has been considered as a test bed to apply the proposed ANN-EKFMPC strategy at supervisory level as a cascade control configuration along with proportional integral controller [ANN-EKFMPC with PI (ANN-EKFMPC-PI)]. The proposed approach is formulated incorporating all aspects of MPC including move suppression factor for control effort minimization and constraint-handling capability including terminal constraints. The nominal stability analysis and offset-free tracking capabilities of the proposed controller are proved. Its performance is evaluated by comparison with a standard MPC-based cascade control approach using the same adaptive ANN model. The ANN-EKFMPC-PI control configuration has shown better controller performance in terms of temperature tracking, smoother input profiles, as well as constraint-handling ability compared with the ANN-MPC with PI approach for two products in summer and winter. The proposed scheme is found to be versatile although it is based on a purely data-driven model with online parameter estimation.

  3. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  4. The ALICE experiment: $\\rm D^{+}$-meson production in heavy-ion collisions and silicon low noise sensors characterization for the ITS Upgrade.

    CERN Document Server

    AUTHOR|(CDS)2084697; Bruna, Elena

    This thesis collects my work on two aspects of the ALICE experiment at the Large Hadron Collider: the measurement of $\\rm D^{+}$-meson production in Pb-Pb collisions at $\\sqrt{s_{\\rm {NN}}}= 2.76$ TeV and the characterization of silicon low noise sensors for the Inner Tracking System Upgrade. I worked within the INFN group of Torino that it is involved in the ALICE experiment both in the physics program related to the study of heavy-flavour production and in the project of the ITS Upgrade. ALICE is one of the main experiment of the LHC and it is the only one optimized to study ultra-relativistic heavy-ion collisions. The main goal is to study the properties of the Quark Gluon Plasma (QGP), a phase of matter where quarks and gluons are deconned. Heavy quarks are a powerful tool to study such properties because they can be created only in hard scattering processes at the initial stage of the collision and, subsequently, they interact with the QGP. The measurement of charmed meson production in Pb-P...

  5. Phase 1 upgrade of the CMS forward hadronic calorimeter

    CERN Document Server

    Noonan, Daniel Christopher

    2017-01-01

    The CMS experiment at the Large Hadron Collider at CERN is upgrading the photo- detection and readout system of the forward hadronic calorimeter. The phase 1 upgrade of the CMS forward calorimeter requires the replacement of the current photomultiplier tubes, as well as the installation of a new front-end readout system. The new photomultiplier tubes contain a thinner window as well as multi-anode readout. The front-end electronics will use the QIE10 ASIC which combines signal digitization with timing information. The major components of the upgrade as well as the current status are described in this paper.

  6. Application of measuring 99mTc-MAG3 plasma clearance based on one-compartment model (MPC method) to pediatric patients

    International Nuclear Information System (INIS)

    Koizumi, Kiyoshi; Higashida, Kousuke; Arbab, A.S.; Toyama, Keiji; Arai, Takao; Yoshitomi, Tatsuya.

    1997-01-01

    Measurement of 99m Tc-MAG3 plasma clearance based on 1-compartment model (MPC method) were applied to 12 pediatric patients and evaluated for the factors which might affect the calculated results. Depth correction is a critical factor for the measurement of renal uptake. Three different equations for estimating renal depth were compared with the real depth measured by ultrasonography. The equation proposed by K. Itoh was suitable though the equations by T. Ito and Raynaud were insufficient. Estimation of distribution volume, which is regarded as circulating plasma volume (CPV), is also critical for the calculation of MAG3 clearance by MPC method. Precisely, hematocrit measured by venous sampling and circulating blood volume (CBV) calculated as 7.5% of body weight are used for estimation of CPV. However, assumed CPV as 5% of body weight was acceptable if the hematocrit was not severely deviated from the normal value. Simplified MPC method utilizing two factors mentioned above gave a positive correlation with Russell's one point sampling method. In conclusion, MPC method is applicable for pediatric patients. (author)

  7. Full kinematic reconstruction of charged B mesons with the upgraded Inner Tracking System of the ALICE Experiment

    CERN Document Server

    AUTHOR|(CDS)2074762

    In this thesis, the performance of the full kinematic reconstruction of $\\mathrm{{B}}^{+}$ mesons in the decay channel $\\mathrm{{B}}^{+}\\rightarrow\\mathrm{\\overline{D}^{0}}\\pi^{+}$ ($\\mbox{$\\mathrm{\\overline{D}^{0}}\\rightarrow \\mathrm{K}^{+}\\pi^{-}$}$) and charge conjugates for the 0-10 % most central Pb-Pb collisions at $\\sqrt{s_{_{\\mathrm{NN}}}}$ = 5.5 TeV is demonstrated for the upgraded ALICE Experiment, which is planned before Run 3 of the Large Hadron Collider (LHC), beginning in 2020. Within the scope of the foreseen detector and readout upgrades to inspect all Pb-Pb collisions at their interaction rate of 50 kHz, in particular through the installation of a new high-granularity pixel inner tracker, for the first time these rare signals will become accessible using full kinematic reconstruction in central Pb-Pb collisions in ALICE at mid-rapidity at the LHC. Topological and kinematic criteria are used to select the beauty signal against the large combinatorial and correlated background. In addition to a...

  8. The Phase-1 Upgrade for the Level-1 Muon Barrel Trigger of the ATLAS Experiment at LHC

    CERN Document Server

    Izzo, Vincenzo; The ATLAS collaboration

    2018-01-01

    The Level-1 Muon Barrel Trigger of the ATLAS Experiment at LHC makes use of Resistive Plate Chamber (RPC) detectors. The on-detector trigger electronics modules are able to identify muons with predefined transverse momentum values (pT) by executing a coincidence logic on signals coming from the various detector layers. On-detector trigger boards then transfer trigger data to the off-detector electronics. A complex trigger system processes the incoming data by combining trigger information from the barrel and the endcap regions, and providing the combined muon candidate to the Central Trigger Processor (CTP). For almost a decade, the Level-1 Trigger system operated very well, despite the challenging requirements on trigger efficiency and performance, and the continuously increasing LHC luminosity. In order to cope with these constraints, various upgrades for the full trigger system were already deployed, and others have been designed to be installed in the next years. Most of the upgrades to the trigger system...

  9. The Phase-1 Upgrade for the Level-1 Muon Barrel Trigger of the ATLAS Experiment at LHC

    CERN Document Server

    Izzo, Vincenzo; The ATLAS collaboration

    2018-01-01

    The Level-1 Barrel Trigger of the ATLAS Experiment is based on Resistive Plate Chambers (RPC) detectors. The on-detector trigger electronics identifies muons with specific values of transverse momentum (pT), by using coincidences between different layers of detectors. Trigger data is then transferred from on-detector to the off-detector trigger electronics boards. Data is processed by a complex system, which combines trigger data from the Barrel and the End-cap regions, and provides the combined muon candidate to the Central Trigger Processor (CTP). The system has been performing very well for almost a decade. However, in order to cope with continuously increasing LHC luminosity and more demanding requirements on trigger efficiency and performance, various upgrades for the full trigger system were already deployed, and others are foreseen in the next years. Most of the trigger upgrades are based on state-of-the-art technologies and allow designing more complex trigger menus, increasing processing power and da...

  10. The Phase-1 Upgrade for the Level-1 Muon Barrel Trigger of the ATLAS Experiment at LHC

    CERN Document Server

    Izzo, Vincenzo; The ATLAS collaboration

    2018-01-01

    The Level-1 Muon Barrel Trigger of the ATLAS Experiment at LHC makes use of Resistive Plate Chamber (RPC) detectors. The on-detector trigger electronics modules are able to identify muons with predefined transverse momentum values (pT) by executing a coincidence logic on signals coming from the various detector layers. Then, on-detector trigger boards transfer trigger data to the off-detector electronics. A complex trigger system processes the incoming data by combining trigger information from the Barrel and the End-cap regions, and by providing the combined muon candidate to the Central Trigger Processor (CTP). For almost a decade, the Level-1 Trigger system has been operating very well, despite the challenging requirements on trigger efficiency and performance, and the continuously increasing LHC luminosity. In order to cope with these constraints, various upgrades for the full trigger system were already deployed, and others have been designed to be installed in the next years. Most of the upgrades to the...

  11. Performance comparison of next generation controller and MPC in real time for a SISO process with low cost DAQ unit

    Directory of Open Access Journals (Sweden)

    V. Bagyaveereswaran

    2016-09-01

    Full Text Available In this paper, a brief overview of real time implementation of next generation Robust, Tracking, Disturbance rejecting, Aggressive (RTDA controller and Model Predictive Control (MPC is provided. The control algorithm is implemented through MATLAB. The plant model used in controller design is obtained using system identification tool and integral response method. The controller model is developed in Simulink using jMPC tool, which will be executed in real time. The outputs obtained are tested for various constraint values to obtain the desirable results. The implementation of Hardware in Loop is done by interfacing it with MATLAB using Arduino as data acquisition unit. The performance of RTDA is compared with those of MPC and Proportional Integral controller.

  12. Review of the treat upgrade reactor scram system reliability analysis

    International Nuclear Information System (INIS)

    Montague, D.F.; Fussell, J.B.; Krois, P.A.; Morelock, T.C.; Knee, H.E.; Manning, J.J.; Haas, P.M.; West, K.W.

    1984-10-01

    In order to resolve some key LMFBR safety issues, ANL personnel are modifying the TREAT reactor to handle much larger experiments. As a result of these modifications, the upgraded Treat reactor will not always operate in a self-limited mode. During certain experiments in the upgraded TREAT reactor, it is possible that the fuel could be damaged by overheating if, once the computer systems fail, the reactor scram system (RSS) fails on demand. To help ensure that the upgraded TREAT reactor is shut down when required, ANL personnel have designed a triply redundant RSS for the facility. The RSS is designed to meet three reliability goals: (1) a loss of capability failure probability of 10 -9 /demand (independent failures only); (2) an inadvertent shutdown probability of 10 -3 /experiment; and (3) protection agaist any known potential common cause failures. According to ANL's reliability analysis of the RSS, this system substantially meets these goals

  13. Development of a Level-1 Track and Vertex Finder for the Phase II CMS experiment upgrade

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00414391; Shepherd-Themistocleous, Claire

    The High Luminosity (HL-LHC) upgrade to the Large Hadron Collider will operate at an increased instantaneous luminosity, up to seven times the design value, in order to collect an integrated luminosity of $3,000$\\,fb$^{-1}$ in the decade following 2025. Proton bunches at the HL-LHC will cross every $25$\\,ns, producing an average of 140-200 pile-up proton-proton collisions per crossing. A new tracking detector is under development for use by the CMS experiment at the HL-LHC. A crucial requirement of this upgrade is to provide the ability to reconstruct charged particle tracks with transverse momentum above $2$--$3$\\,GeV within $4\\,\\upmu$s to be used in the Level-1 (L1) trigger decision. This thesis presents one of the main proposals for the final L1 Track Finding system, which exploits a fully time-multiplexed architecture based on high-speed FPGA electronics. The developed track finding algorithm makes use of the Hough Transform technique to identify track candidates, followed by a track fitting stage. Sever...

  14. The upgrade of the CMS hadron calorimeter with silicon photomultipliers

    CERN Document Server

    Strobbe, N

    2017-01-01

    The upgrade of the hadron calorimeter of the CMS experiment at the CERN Large Hadron Collider is currently underway. The endcap sections will be upgraded in the winter of 2016–2017 and the barrel sections during the second LHC long shutdown in 2019. The existing photosensors will be replaced with about 16 000 new silicon photomultipliers (SiPMs), resulting in the first large installation of SiPMs in a radiation environment. All associated front-end electronics will also be upgraded. This paper discusses the motivation for the upgrade and provides a description 17 of the new system, including the SiPMs with associated control electronics and the front-end readout cards.

  15. Neutral particle time-of-flight analyzer for the Tandem Mirror Experiment Upgrade (TMX-U)

    International Nuclear Information System (INIS)

    Hibbs, S.M.; Carter, M.R.; Coutts, G.W.

    1985-01-01

    We describe the design and performance of a time-of-flight (ToF) analyzer being built for installation on the east end cell of the Tandem Mirror Experiment Upgrade (TMX-U). Its primary purpose is to measure the velocity distribution of escaping charge exchange neutral particles having energies between 20 and 5000 electron volts (eV). It also enables direct determination of the thermal barrier potential when used in conjunction with the plasma potential diagnostic and the end loss ion spectrometer. In addition, it can measure the velocity distribution of passing ions leaving the central cell and of ions trapped in the thermal barrier

  16. Integrated waste management system costs in a MPC system

    International Nuclear Information System (INIS)

    Supko, E.M.

    1995-01-01

    The impact on system costs of including a centralized interim storage facility as part of an integrated waste management system based on multi-purpose canister (MPC) technology was assessed in analyses by Energy Resources International, Inc. A system cost savings of $1 to $2 billion occurs if the Department of Energy begins spent fuel acceptance in 1998 at a centralized interim storage facility. That is, the savings associated with decreased utility spent fuel management costs will be greater than the cost of constructing and operating a centralized interim storage facility

  17. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  18. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5x compared to the design luminosity (10^34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade is expected to happen around 2023. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 ...

  19. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Lingemann, Joschka; Sakulin, Hannes; Jeitler, Manfred; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run 2 of the Large Hadron Collider pose new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run 1, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new microTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (GMT) which combines information from the muon trigger sub-systems and assigns the isolation variable. The upgraded GMT will be implemented using a Master Processor 7 card, built by Imperial College, that features a large Xilinx Virtex 7 FPGA. Up to 72 optical links at...

  20. Actuator management for ECRH at ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rapson, Christopher J., E-mail: chris.rapson@ipp.mpg.de; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-10-15

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  1. Actuator management for ECRH at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Rapson, Christopher J.; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-01-01

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  2. The ATLAS SCT: Commissioning Experience and SLHC Upgrade

    OpenAIRE

    Mitrevski, J

    2008-01-01

    The ATLAS Semiconductor Tracker (SCT) has been installed, and fully connected to electrical, optical and cooling services. Commissioning has been performed both with calibration data and cosmic ray events. The cosmics were used to align the detector, measure the hit efficiency and set the timing. The SCT is now ready to take data when the LHC turns on this autumn. At the same time, it is clear that the present ATLAS tracker will need to be renewed for projected luminosity upgrade of the LHC, ...

  3. Ion cyclotron radio frequency systems and performance on the tandem mirror experiment-upgrade (TMX-U)

    International Nuclear Information System (INIS)

    Moore, T.L.; Molvik, A.W.; Cummins, W.F.; Pedrotti, L.R.; Henderson, A.L.; Karsner, P.G.; Scofield, D.W.; Brooksby, C.A.

    1983-01-01

    High power ion cyclotron radio frequency (ICRF) systems are now gaining greater attention than before as prime driver ion heating systems. Lawrence Livermore National Laboratory (LLNL) has installed a 200 kW high frequency (HF) transmitter system on its Tandem Mirror Experiment-Upgrade (TMX-U). This paper describes the system, antenna, controls, and monitoring apparatus. The transmitter operates into a high Q antenna installed in the central cell region of the experiment. It incorporates a dual-port feedback system to automatically adjust the transmitter's output power and allow the maximum consistent with the plasma loading of the antenna. Special techniques have been used to measure, in real-time, the dynamically changing loading values presented by the plasma. From the measurements, the antenna impedance can be optimized for specified plasma density

  4. Rewiring yeast acetate metabolism through MPC1 loss of function leads to mitochondrial damage and decreases chronological lifespan

    Directory of Open Access Journals (Sweden)

    Ivan Orlandi

    2014-11-01

    Full Text Available During growth on fermentable substrates, such as glucose, pyruvate, which is the end-product of glycolysis, can be used to generate acetyl-CoA in the cytosol via acetaldehyde and acetate, or in mitochondria by direct oxidative decarboxylation. In the latter case, the mitochondrial pyruvate carrier (MPC is responsible for pyruvate transport into mitochondrial matrix space. During chronological aging, yeast cells which lack the major structural subunit Mpc1 display a reduced lifespan accompanied by an age-dependent loss of autophagy. Here, we show that the impairment of pyruvate import into mitochondria linked to Mpc1 loss is compensated by a flux redirection of TCA cycle intermediates through the malic enzyme-dependent alternative route. In such a way, the TCA cycle operates in a “branched” fashion to generate pyruvate and is depleted of intermediates. Mutant cells cope with this depletion by increasing the activity of glyoxylate cycle and of the pathway which provides the nucleocytosolic acetyl-CoA. Moreover, cellular respiration decreases and ROS accumulate in the mitochondria which, in turn, undergo severe damage. These acquired traits in concert with the reduced autophagy restrict cell survival of the mpc1∆ mutant during chronological aging. Conversely, the activation of the carnitine shuttle by supplying acetyl-CoA to the mitochondria is sufficient to abrogate the short-lived phenotype of the mutant.

  5. LHC Interaction Region Upgrade Phase I

    CERN Document Server

    Ostojic, R

    2009-01-01

    The LHC is starting operation with beam in 2008. The primary goal of CERN and the LHC community is to ensure that the collider is operated efficiently, maximizing its physics reach, and to achieve the nominal performance in the shortest term. Since several years the community has been discussing the directions for upgrading the experiments, in particular ATLAS and CMS, the LHC machine and the CERN proton injector complex. A well substantiated and coherent scenario for the first phase of the upgrade, which is foreseen in 2013, is now approved by CERN Council. In this paper, we present the goals and the proposed conceptual solution for the Phase-I upgrade of the LHC interaction regions. This phase relies on the mature Nb-Ti superconducting magnet technology, with the target of increasing the luminosity by a factor of 2-3 with respect to the nominal luminosity of 1034 cm-2s-1, while maximising the use of the existing infrastructure.

  6. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  7. Experiences with the upgraded SKP system during refuelling Paks nuclear power plant

    International Nuclear Information System (INIS)

    Baranyai, A.; Hetzmann, A.

    1997-01-01

    In order to control the neutron flux during the refueling period, new measuring chains were developed and put into operation by the experts of KFKI-RegTron Co., Ltd. and the Paks Nuclear Power Plant with the purpose of partially substituting the original Refuelling Neutron Monitoring system (SKP) of WWER-440 reactor units. The modified monitoring system processes the signals of detectors located in channels outside the core. The outputs of measurement amplifiers equipped with up-to-date electronics fit in the original system perfectly. Use of the out-of-core measuring technique confirmed the preliminary expectations: interference sensitivity has decreased, the neutron/gamma ration increased and refueling time has become shorter by one to one-and-a-half day. The paper details the reasons for upgrading, the essence of utilized solutions and the operational experience. (author)

  8. Upgrade of High-Energy X-Ray real-time radioscopy for KROTOS experiment

    Energy Technology Data Exchange (ETDEWEB)

    Estre, N.; Payan, E.; Cassiaut-Louis, N.; Compagnon, F.; Valerian, M.; Mallet, R. [CEA-Cadarache (France)

    2015-07-01

    As part of its R and D programs on severe accidents, in particular on understanding of corium-water interaction, CEA is commissioning an update of the KROTOS experiment at Cadarache. The Xray imaging setup (high energy real-time radioscopy) is upgraded to provide the best performances for the new experimental program. In order to fit the performance needs (faster acquisition, smaller detection limit and higher field of view), two radioscopy setups, with two linear accelerators (linacs 9 MV and 6 MV), are placed in the irradiation cell. Having discussed the expected performances in terms of frequency, detection limit and field-of-view, this article details each stage of both radioscopy chains: principles and technical characteristics. Then, linacs and cameras synchronization (at few hundred Hertz), data flows and storage setups are detailed. Finally, experimental characterizations and performance validations on phantom are presented. (authors)

  9. Upgrade of High-Energy X-Ray real-time radioscopy for KROTOS experiment

    International Nuclear Information System (INIS)

    Estre, N.; Payan, E.; Cassiaut-Louis, N.; Compagnon, F.; Valerian, M.; Mallet, R.

    2015-01-01

    As part of its R and D programs on severe accidents, in particular on understanding of corium-water interaction, CEA is commissioning an update of the KROTOS experiment at Cadarache. The Xray imaging setup (high energy real-time radioscopy) is upgraded to provide the best performances for the new experimental program. In order to fit the performance needs (faster acquisition, smaller detection limit and higher field of view), two radioscopy setups, with two linear accelerators (linacs 9 MV and 6 MV), are placed in the irradiation cell. Having discussed the expected performances in terms of frequency, detection limit and field-of-view, this article details each stage of both radioscopy chains: principles and technical characteristics. Then, linacs and cameras synchronization (at few hundred Hertz), data flows and storage setups are detailed. Finally, experimental characterizations and performance validations on phantom are presented. (authors)

  10. Installation and Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Onel, Yasar

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade was performed during the Extended Year End Technical Stop of 2016-2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics was also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to provide additional handles to eliminate the background. Following this major upgrade, the Hadron Forward Calorimeters are being commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  11. System-wide hybrid MPC-PID control of a continuous pharmaceutical tablet manufacturing process via direct compaction.

    Science.gov (United States)

    Singh, Ravendra; Ierapetritou, Marianthi; Ramachandran, Rohit

    2013-11-01

    The next generation of QbD based pharmaceutical products will be manufactured through continuous processing. This will allow the integration of online/inline monitoring tools, coupled with an efficient advanced model-based feedback control systems, to achieve precise control of process variables, so that the predefined product quality can be achieved consistently. The direct compaction process considered in this study is highly interactive and involves time delays for a number of process variables due to sensor placements, process equipment dimensions, and the flow characteristics of the solid material. A simple feedback regulatory control system (e.g., PI(D)) by itself may not be sufficient to achieve the tight process control that is mandated by regulatory authorities. The process presented herein comprises of coupled dynamics involving slow and fast responses, indicating the requirement of a hybrid control scheme such as a combined MPC-PID control scheme. In this manuscript, an efficient system-wide hybrid control strategy for an integrated continuous pharmaceutical tablet manufacturing process via direct compaction has been designed. The designed control system is a hybrid scheme of MPC-PID control. An effective controller parameter tuning strategy involving an ITAE method coupled with an optimization strategy has been used for tuning of both MPC and PID parameters. The designed hybrid control system has been implemented in a first-principles model-based flowsheet that was simulated in gPROMS (Process System Enterprise). Results demonstrate enhanced performance of critical quality attributes (CQAs) under the hybrid control scheme compared to only PID or MPC control schemes, illustrating the potential of a hybrid control scheme in improving pharmaceutical manufacturing operations. Copyright © 2013 Elsevier B.V. All rights reserved.

  12. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    Wessels, M; The ATLAS collaboration

    2014-01-01

    The Level-1 Calorimeter Trigger (L1Calo) of the ATLAS experiment has been operating well since the start of LHC data taking, and played a major role in the Higgs boson discovery. To face the new challenges posed by the upcoming increases of the LHC proton beam energy and luminosity, a series of upgrades is planned for L1Calo. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to allow more sophisticated digital filters for energy and timing measurement, as well as compensate for pile-up and baseline shifting effects. Two existing digital algorithm processor subsystems will receive substantial hardware and firmware upgrades to increase the real-time data path bandwidth, allowing topological information to be transmitted and processed at Level-1. An entirely new subsystem, the Level-1 Topological Processor, will receive real-time data from both the upgraded L1Calo and Level-1 Muon Trigger to perform trigger algorithms based on entire event topolo...

  13. Experiences when employing different alternatives for envelope upgrading

    Directory of Open Access Journals (Sweden)

    Peru Elguezabal Esnarrizaga

    2015-06-01

    Full Text Available The challenges of achieving the 2020 goals in terms of energy savings and improving efficiency are guiding numerous research initiatives looking for more insulated envelopes, dealing with thermal performance of insulation materials and envelope systems. Nevertheless, the envelope integrates within the building and this improvement on the insulation performance has to be properly adopted, taking into account the interrelation of main elements composing the overall system (facade, frame, slabs, openings, partitions etc., as well as side effects originated not only for new erected buildings, but specifically in renovation and retrofitting works. This paper describes real experiences when considering various options for upgrading the facade through the increase of the insulation capacity, starting from external overcladding prefabricated panels and ventilated facades, advancing to more sustainable low carbon systems and ending with even more highly insulated solutions employing aerogels. Lessons from these cases, where energy and hygrothermal assessments have being carried out, demonstrate the influence of the design and construction phases and the relevance of disregarded effects such as minor thermal bridges, uncontrolled craftsmanship on site, and moisture transfer for the different technologies considered. Finally, possible alternatives are provided to overcome some of the detected difficulties, such as combination with non-metallic structural components and building membranes, and being prepared for future challenges and new developments when these isolative elements are combined with other technologies, as for example, renewable energy harvesting devices.  

  14. A Comparative study between MPC and PI controller to control vacuum distillation unit for producing LVGO, MVGO, and HVGO

    Science.gov (United States)

    Wahid, A.; Prasetyo, A. P.

    2018-03-01

    This study describes the selection of controllers in the vacuum distillation unit (VDU) between a model predictive control (MPC) and a proportional-integral (PI) controller by comparing the integral square error (ISE) values. Design of VDU in this simulation is based on modified Metso Automation Inc. scheme. Controlled variables in this study are feed flow rate, feed temperature, top stage pressure, condenser level, bottom stage temperature, LVGO (light vacuum gas oil), MVGO (medium vacuum gas oil), and HVGO (heavy vacuum gas oil) flow rate. As a result, control performance improvements occurred as using MPC compared to PI controllers, when testing a set-point change, of feed flow rate control, feed temperature, top-stage pressure, bottom-stage temperature and flow rate of LVGO, MVGO, and HVGO, respectively, 36%, 6%, 92%, 53%, 90%, 96% and 88%. Only on condenser level control PI performs much better than the MPC. So PI controller is used for level condenser control. While for the test of disturbance rejection, by changing feed flow rate by 10%, there is improvement of control performance using MPC compared to PI controller on feed temperature control, top-stage pressure, bottom-stage temperature and flow rate LVGO, MVGO and HVGO 0.3%, 0.7%, 14%, 2.7%, 10.6% and 4.3%, respectively.

  15. Forward calorimetry in the upgraded UA1 experiment

    International Nuclear Information System (INIS)

    Alvarez-Taviel, F.J.; Diez-Hedo, F.; Doncel, P.; Marquina, M.A.; Rodrigo, T.; Bacci, C.; Petrolo, E.; Tusi, A.; Ferrando, A.; Givernaud, A.; Rubbia, C.; Vuillemin, V.

    1989-01-01

    The major improvement in the upgraded UA1 calorimetry at the Santi ppS is the general use of ionization chambers filled with tetramethylpentane (TMP) as a detection medium interspersed with uranium plates as absorber. To achieve overall uniformity of detection down to very small angles, an identical solution is proposed for the forward calorimetry. Forward calorimetry is essential for good total and missing energy measurement at high luminosity in view of the increasing rate of multiple collisions. Both designs for forward and very forward calorimeters are presented along with expected resolutions. (orig.)

  16. Selected issues for the LHC luminosity upgrade

    International Nuclear Information System (INIS)

    Laface, E.

    2008-12-01

    The Large Hadron Collider started its operations on September 10. 2008. In a realistic forecast it is supposed to demonstrate (or confute) the existence of the Higgs boson for the year 2014. After this date the physics of rare events will be explored more in details and an upgrade of the luminosity can make an important difference in the program of experiments at CERN. This thesis proposes several ideas to increase the luminosity of ATLAS and CMS experiments and the acceptance of TOTEM experiment. The main object of study is the Interaction Region, that consists in the set of magnets in charge to provide the final beam focalization for the collisions. The Interaction Region is studied with the methods of beam optics and beam dynamics to design new layouts for the upgrade. These layouts are also explored from the point of view of integrability in the existing experiments developing the analysis of energy deposition and misalignment tolerances. This study was performed with the use of analytical methods for the general considerations and numerical methods for the parameters optimization. (author)

  17. Quantifying Compressibility and Slip in Multiparticle Collision (MPC Flow Through a Local Constriction

    Directory of Open Access Journals (Sweden)

    Tahmina Akhter

    2014-01-01

    Full Text Available The flow of a compressible fluid with slip through a cylinder with an asymmetric local constriction has been considered both numerically, as well as analytically. For the numerical work, a particle-based method whose dynamics is governed by the multiparticle collision (MPC rule has been used together with a generalized boundary condition that allows for slip at the wall. Since it is well known that an MPC system corresponds to an ideal gas and behaves like a compressible, viscous flow on average, an approximate analytical solution has been derived from the compressible Navier–Stokes equations of motion coupled to an ideal gas equation of state using the Karman–Pohlhausen method. The constriction is assumed to have a polynomial form, and the location of maximum constriction is varied throughout the constricted portion of the cylinder. Results for centerline densities and centerline velocities have been compared for various Reynolds numbers, Mach numbers, wall slip values and flow geometries.

  18. Operational experiences and upgradation of waste management facilities Trombay, India

    International Nuclear Information System (INIS)

    Chander, Mahesh; Bodke, S.B.; Bansal, N.K.

    2001-01-01

    Full text: Waste Management Facilities Trombay provide services for the safe management of radioactive wastes generated from the operation of non power sources at Bhabha Atomic Research Centre, India. The paper describes in detail the current operational experience and facility upgradation by way of revamping of existing processes equipment and systems and augmentation of the facility by way of introducing latest processes and technologies to enhance the safety. Radioactive wastes are generated from the operation of research reactors, fuel fabrication, spent fuel reprocessing, research labs. manufacture of sealed sources and labeled compounds. Use of radiation sources in the field of medical, agriculture and industry also leads to generation of assorted solid waste and spent sealed radiation sources which require proper waste management. Waste Management Facilities Trombay comprise of Effluent Treatment Plant (ETP), Decontamination Centre (DC) and Radioactive Solid Waste Management Site (RSMS). Low level radioactive liquid effluents are received at ETP. Plant has 100 M 3 /day treatment capacity. Decontamination of liquid effluents is effected by chemical treatment method using co- precipitation as a process. Plant has 1800 M 3 of storage capacity. Chemical treatment system comprises of clarifloculator, static mixer and chemical feed tanks. Plant has concentrate management facility where chemical sludge is centrifuged to effect volume reduction of more that 15. Thickened sludge is immobilized in cement matrix. Decontamination Centre caters to the need of equipment decontamination from research reactors. Process used is ultrasonic chemical decontamination. Besides this DC provides services for decontamination of protective wears. Radioactive Solid Waste Management Site is responsible for the safe management of solid waste generated at various research reactors, plants, laboratories in Bhabha Atomic Research Centre. Spent sealed radiation sources are also stored

  19. Quality assurance of GEM foils in the framework of the TPC upgrade in the ALICE experiment

    CERN Document Server

    Ozcelik, Melih Arslan

    2016-01-01

    In the framework of the TPC upgrade of the ALICE Experiment, new readout chambers will be installed during the LHC long shutdown 2, which is scheduled to start in July 2018. The current MWPCs (Multi Wire Proportional Chambers) will be replaced by readout chambers consisting of GEM (Gas Electron Multipliers) foils in order to meet the increasing readout rate requirements. QA (Quality Assurance) tests on the GEMs are performed to classify the foils. In this report we present the work done during the CERN Summer Student Programme 2016.

  20. Two-dimensional Value Stream Mapping: Integrating the design of the MPC system in the value stream map

    DEFF Research Database (Denmark)

    Powell, Daryl; Olesen, Peter Bjerg

    2013-01-01

    Companies use value stream mapping to identify waste, often in the early stages of a lean implementation. Though the tool helps users to visualize material and information flows and to identify improvement opportunities, a limitation of this approach is the lack of an integrated method...... for analysing and re-designing the MPC system in order to support lean improvement. We reflect on the current literature regarding value stream mapping, and use practical insights in order to develop and propose a two-dimensional value stream mapping tool that integrates the design of the MPC system within...... the material and information flow map....

  1. Small-Strip Thin Gap Chambers for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221766; The ATLAS collaboration

    2016-01-01

    The ATLAS muon system upgrade to be installed during the LHC long shutdown in 2018/19, the so called New Small Wheel (NSW), is designed to cope with the increased instantaneous luminosity in LHC Run 3. The small-strip Thin Gap Chambers (sTGC) will provide the NSW with fast trigger and high precision tracking. The construction protocol has been validated by test beam experiments on a full-size prototype sTGC detector, showing the performance requirements are met. The intrinsic spatial resolution for a single layer has been found to be about 50$\\mu$m at perpendicular incident angle, and the pads transition region has been measured to be about 4mm.

  2. Final Report: ATLAS Phase-2 Tracker Upgrade Layout Task Force

    CERN Document Server

    Clark, A; The ATLAS collaboration; Hessey, N; Mättig, P; Styles, N; Wells, P; Burdin, S; Cornelissen, T; Todorov, T; Vankov, P; Watson, I; Wenig, S

    2012-01-01

    he mandate of the Upgrade Layout Task Force was to develop a benchmark layout proposal for the ATLAS Phase-2 Upgrade Letter of Intent (LOI), due in late 2012. The work described in this note has evolved from simulation and design studies made using an earlier "UTOPIA" upgrade tracker layout, and experience gained from the current ATLAS Inner Detector during the first years of data taking. The layout described in this document, called the LoI-layout, will be used as a benchmark layout for the LoI and will be used for simulation and engineering studies described in the LoI.

  3. LHCb: A new Readout Control system for the LHCb Upgrade

    CERN Multimedia

    Alessio, F

    2012-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire readout architecture will be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the architecture, functionalities and the first hardware implementation of a new Readout Control system for the LHCb upgrade. The system is based on FPGAs and bi-directional links for the control of the entire readout architecture. First results on the validation of the system are also given.

  4. Do we really need a collimator upgrade?

    International Nuclear Information System (INIS)

    Redaelli, S.

    2012-01-01

    Several improvements are foreseen for the LHC collimation system during the LS1 and beyond. The changes are matched to the required performance reach during the HL-LHC era. The scenarios for system upgrades are determined based on the present operational experience with the operation at 3.5 TeV, well about the beam stored energy regime of 100 MJ. The present upgrade strategy, and the uncertainties on the performance extrapolation to 7 TeV are presented. The collimation activities in LS1 are outlined and the possible works for LS2 and LS3 are presented. (author)

  5. Upgrading the Atlas Tile Calorimeter Electronics

    CERN Document Server

    Popeneciu, G; The ATLAS collaboration

    2014-01-01

    Tile Calorimeter is the central hadronic calorimeter of the ATLAS experiment at LHC. Around 2024, after the upgrade of the LHC the peak luminosity will increase by a factor of 5 compared to the design value, thus requiring an upgrade of the Tile Calorimeter readout electronics. Except the photomultipliers tubes (PMTs), most of the on- and off-detector electronics will be replaced, with the aim of digitizing all PMT pulses at the front-end level and sending them with 10 Gb/s optical links to the back-end electronics. One demonstrator prototype module is planned to be inserted in Tile Calorimeter in 2015 that will include hybrid electronic components able to probe the new design.

  6. MPC-Based Path Following Control of an Omnidirectional Mobile Robot with Consideration of Robot Constraints

    Directory of Open Access Journals (Sweden)

    Kiattisin Kanjanawanishkul

    2015-01-01

    Full Text Available In this paper, the path following problem of an omnidirectional mobile robot (OMR has been studied. Unlike nonholonomic mobile robots, translational and rotational movements of OMRs can be controlled simultaneously and independently. However the constraints of translational and rotational velocities are coupled through the OMR's orientation angle. Therefore, a combination of a virtual-vehicle concept and a model predictive control (MPC strategy is proposed in this work to handle both robot constraints and the path following problem. Our proposed control scheme allows the OMR to follow the reference path successfully and safely, as illustrated in simulation experiments. The forward velocity is close to the desired one and the desired orientation angle is achieved at a given point on the path, while the robot's wheel velocities are maintained within boundaries.

  7. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  8. Explicit MPC design and performance-based tuning of an Adaptive Cruise Control Stop-&-Go

    NARCIS (Netherlands)

    Naus, G.J.L.; Ploeg, J.; Molengraft, M.J.G. van de; Steinbuch, M.

    2008-01-01

    This paper presents the synthesis, the implementation and the performance-based tuning of an Adaptive Cruise Control (ACC) Stop-&-Go (S&G) design. A Model Predictive Control (MPC) framework is adopted to design the controller. Performance of the controller is evaluated, distinguishing between

  9. Discovery of an L-alanine ester prodrug of the Hsp90 inhibitor, MPC-3100.

    Science.gov (United States)

    Kim, Se-Ho; Tangallapally, Rajendra; Kim, In Chul; Trovato, Richard; Parker, Daniel; Patton, J Scott; Reeves, Leslie; Bradford, Chad; Wettstein, Daniel; Baichwal, Vijay; Papac, Damon; Bajji, Ashok; Carlson, Robert; Yager, Kraig M

    2015-11-15

    Various types of Hsp90 inhibitors have been and continue to undergo clinical investigation. One development candidate is the purine-based, synthetic Hsp90 inhibitor 1 (MPC-3100), which successfully completed a phase I clinical study. However, further clinical development of 1 was hindered by poor solubility and consequent formulation issues and promoted development of a more water soluble prodrug. Towards this end, numerous pro-moieties were explored in vitro and in vivo. These studies resulted in identification of L-alanine ester mesylate, 2i (MPC-0767), which exhibited improved aqueous solubility, adequate chemical stability, and rapid bioconversion without the need for solubilizing excipients. Based on improved physical characteristics and favorable PK and PD profiles, 2i mesylate was selected for further development. A convergent, scalable, chromatography-free synthesis for 2i mesylate was developed to support further clinical evaluation. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. Upgrade of the ATLAS Level-1 Calorimeter Trigger

    CERN Document Server

    Mueller, Felix; The ATLAS collaboration

    2014-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Based on the lessons learned , a series of upgrades is planned for L1Calo to face the new challenges posed by the upcoming increases of the LHC beam energy and luminosity. The initial upgrade phase in 2013-14 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. In this contribution we present the lessons learned during the first period of LHC data taking. Based on these we discuss the expected performance improvements tog...

  11. DAQ Architecture for the LHCb Upgrade

    International Nuclear Information System (INIS)

    Liu, Guoming; Neufeld, Niko

    2014-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2 × 10 33 cm −2 s −1 . The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of LHCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of ∼ 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and relative cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ system.

  12. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Souza, J; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5-fold compared to the design luminosity (10exp34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2023. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. The smallest independent on-detector electronics module has been reduced from 45 channels to 6, greatly reducing the consequences of a failure in the on-detector electronics. The size of t...

  13. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Reed, Robert; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the main hadronic calorimeter covering the central region of the ATLAS experiment at LHC. TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC operation (Phase 2 around 2023) where the peak luminosity will increase 5x compared to the design luminosity (10^{34} cm^{-2}s^{-1}) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims to replace the majority of the on- and off-detector electronics so that all calorimeter signals can be digitized and directly sent to the off-detector electronics in the counting room. This will reduce pile-up problems and allow more complex trigger algorithms. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to t...

  14. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase 2) where the peak luminosity will increase 5$\\times$ compared to the design luminosity ($10^{34} cm^{-2}s^{-1}$) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, c...

  15. A Hybrid MPC-PID Control System Design for the Continuous Purification and Processing of Active Pharmaceutical Ingredients

    Directory of Open Access Journals (Sweden)

    Maitraye Sen

    2014-05-01

    Full Text Available In this work, a hybrid MPC (model predictive control-PID (proportional-integral-derivative control system has been designed for the continuous purification and processing framework of active pharmaceutical ingredients (APIs. The specific unit operations associated with the purification and processing of API have been developed from first-principles and connected in a continuous framework in the form of a flowsheet model. These integrated unit operations are highly interactive along with the presence of process delays. Therefore, a hybrid MPC-PID is a promising alternative to achieve the desired control loop performance as mandated by the regulatory authorities. The integrated flowsheet model has been simulated in gPROMSTM (Process System Enterprise, London, UK. This flowsheet model has been linearized in order to design the control scheme. The ability to track the set point and reject disturbances has been evaluated. A comparative study between the performance of the hybrid MPC-PID and a PID-only control scheme has been presented. The results show that an enhanced control loop performance can be obtained under the hybrid control scheme and demonstrate that such a scheme has high potential in improving the efficiency of pharmaceutical manufacturing operations.

  16. Effect of pH adjustment, homogenization and diafiltration on physicochemical, reconstitution, functional and rheological properties of medium protein milk protein concentrates (MPC70).

    Science.gov (United States)

    Meena, Ganga Sahay; Singh, Ashish Kumar; Gupta, Vijay Kumar; Borad, Sanket; Arora, Sumit; Tomar, Sudhir Kumar

    2018-04-01

    Poor solubility is the major limiting factor in commercial applications of milk protein concentrates (MPC) powders. Retentate treatments such as pH adjustment using disodium phosphate (Na 2 HPO 4 ), also responsible for calcium chelation with homogenization and; its diafiltration with 150 mM NaCl solution were hypothesized to improve the functional properties of treated MPC70 powders. These treatments significantly improved the solubility, heat stability, water binding, dispersibility, bulk density, flowability, buffer index, foaming and emulsifying capacity of treated powders over control. Rheological behaviour of reconstituted MPC solutions was best explained by Herschel Bulkley model. Compared to rough, large globular structures with dents in control; majorly intact, separate, smaller particles of smooth surface, without any aggregation were observed in SEM micrograph of treated powders. Applied treatments are easy, cost-effective and capable to improve functional properties of treated powders that could replace control MPC70 powder in various food applications where protein functionality is of prime importance.

  17. Use of ultrasound in petroleum residue upgradation

    Energy Technology Data Exchange (ETDEWEB)

    Sawarkar, A.N.; Pandit, A.B.; Samant, S.D.; Joshi, J.B. [Mumbai Univ., Mumbai (India). Inst. of Chemical Technology

    2009-06-15

    The importance of bottom-of-the barrel upgrading has increased in the current petroleum refining scenario because of the progressively heavier nature of crude oil. Heavy residues contain large concentrations of metals such as vanadium and nickel which foul catalysts and reduce the potential effect of residue fluidized catalytic cracking. This study showed that the cavitational energy induced by ultrasound be be successfully used to upgrade hydrocarbon mixtures. Conventional processes for the upgrading of residual feedstocks, such as thermal cracking and catalytic cracking, were carried out in the temperature range of 400-520 degrees C. Experiments were performed on 2 vacuum residues, Arabian mix vacuum residue (AMVR) and Bombay high vacuum residue (BHVR) and 1 Haldia asphalt (HA). These were subjected to acoustic cavitation for different reaction times from 15 to 120 minutes at ambient temperature and pressure. Two acoustic cavitation devices were compared, namely the ultrasonic bath and ultrasonic horn. In particular, this study compared the ability of these 2 devices to upgrade the petroleum residues to lighter, more value-added products. Different surfactants were used to examine the effect of ultrasound on upgrading the residue when emulsified in water. In order to better understand the reaction mechanism, a kinetic model was developed based on the constituents of the residue. The ultrasonic horn was found to be more effective in bringing about the upgrading than ultrasonic bath. The study also showed that the acoustic cavitation of the aqueous emulsified hydrocarbon mixture could reduce the asphaltenes content to a greater extent than the acoustic cavitation of non-emulsified hydrocarbon mixture. 20 refs., 11 tabs., 17 figs.

  18. Micromegas Detectors for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Iodice, Mauro; The ATLAS collaboration

    2015-01-01

    The Micromegas (MICRO MEsh GAseous Structure) have been proven along the years to be reliable detectors with excellent space resolution and high rate capability. Large area Micromegas will be employed for the first time in high-energy physics for the Muon Spectrometer upgrade of the ATLAS experiment at CERN LHC. A total surface of about 150 m$^2$ of the forward regions of the Muon Spectrometer will be equipped with 8 layers of Micromegas modules. Each module covers a surface from 2 to 3 m$^2$ for a total active area of 1200 m$^2$. Together with the small-strips Thin Gap Chambers, they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS Endcap Muon tracking system in the 2018/19 shutdown. The breakthroughs and developments of this type of Micro Pattern Gas Detector will be reviewed, along with the path towards the construction of the modules, which will take place in several production sites starting in 2015. An overview of the detector performances obtained in the rec...

  19. Micromegas Detectors for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Iodice, M; The ATLAS collaboration

    2014-01-01

    The Micromegas (MICRO MEsh GAseous Structure) chambers have been proven along the years to be reliable detectors with excellent space resolution and high rate capability. Large area Micromegas will be employed for the first time in high-energy physics for the Muon Spectrometer upgrade of the ATLAS experiment at CERN LHC. A total surface of about 150 m2 of the forward regions of the Muon Spectrometer will be equipped with 8 layers of Micromegas modules. Each module covers a surface from 2 to 3 m2 for a total active area of 1200 m2. Together with the small-strips Thin Gap Chambers, they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS Endcap Muon tracking system in the 2018/19 shutdown. The principles of operation and recent developments of this type of Micro Pattern Gas Detector will be reviewed, along with our plans towards the construction of the modules, which will take place in several production sites. An overview of the detector performances obtained in the re...

  20. A Comparative Study of Applying Active-Set and Interior Point Methods in MPC for Controlling Nonlinear pH Process

    Directory of Open Access Journals (Sweden)

    Syam Syafiie

    2014-06-01

    Full Text Available A comparative study of Model Predictive Control (MPC using active-set method and interior point methods is proposed as a control technique for highly non-linear pH process. The process is a strong acid-strong base system. A strong acid of hydrochloric acid (HCl and a strong base of sodium hydroxide (NaOH with the presence of buffer solution sodium bicarbonate (NaHCO3 are used in a neutralization process flowing into reactor. The non-linear pH neutralization model governed in this process is presented by multi-linear models. Performance of both controllers is studied by evaluating its ability of set-point tracking and disturbance-rejection. Besides, the optimization time is compared between these two methods; both MPC shows the similar performance with no overshoot, offset, and oscillation. However, the conventional active-set method gives a shorter control action time for small scale optimization problem compared to MPC using IPM method for pH control.

  1. A new readout control system for the LHCb upgrade at CERN

    International Nuclear Information System (INIS)

    Alessio, F; Jacobsson, R

    2012-01-01

    The LHCb experiment has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity. The entire readout architecture will be upgraded in order to cope with higher sub-detector occupancies, higher rate and higher network load. In this paper, we describe the architecture, functionalities and a first hardware implementation of a new fast Readout Control system for the LHCb upgrade, which will be entirely based on FPGAs and bi-directional links. We also outline the real-time implementations of the new Readout Control system, together with solutions on how to handle the synchronous distribution of timing and synchronous information to the complex upgraded LHCb readout architecture. One section will also be dedicated to the control and usage of the newly developed CERN GBT chipset to transmit fast and slow control commands to the upgraded LHCb Front-End electronics. At the end, we outline the plans for the deployment of the system in the global LHCb upgrade readout architecture.

  2. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (P hase - II ) where the pea k luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expe cted to happen around 202 4 . The TileCal upgrade aims at replacing the majority of the on - and off - detector electronics to the extent that all calorimeter signals will be digitized and sent to the off - detector electronics in the counting room. To achieve th e required reliability, redundancy has been introduced at different levels. Three different options are presently being investiga...

  3. Silicon Strip Detectors for the ATLAS sLHC Upgrade

    CERN Document Server

    Miñano, M; The ATLAS collaboration

    2011-01-01

    While the Large Hadron Collider (LHC) at CERN is continuing to deliver an ever-increasing luminosity to the experiments, plans for an upgraded machine called Super-LHC (sLHC) are progressing. The upgrade is foreseen to increase the LHC design luminosity by a factor ten. The ATLAS experiment will need to build a new tracker for sLHC operation, which needs to be suited to the harsh sLHC conditions in terms of particle rates. In order to cope with the increase in pile-up backgrounds at the higher luminosity, an all silicon detector is being designed. To successfully face the increased radiation dose, a new generation of extremely radiation hard silicon detectors is being designed. The left part of figure 1 shows the simulated layout for the ATLAS tracker upgrade to be installed in the volume taken up by the current ATLAS pixel, strip and transition radiation detectors. Silicon sensors with sufficient radiation hardness are the subject of an international R&D programme, working on pixel and strip sensors. The...

  4. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  5. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00439268; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of 7.5 × 1034 cm−2s−1, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architecture and expected ...

  6. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00421104; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of $7.5 \\times 10^{34} cm^{-2}s^{-1}$, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architecture an...

  7. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    George, Simon; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of 7.5 × 10^{34} cm^{−2}s^{−1}, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architecture and ...

  8. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    Balunas, William Keaton; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of $7.5 × 10^{34}$ cm$^{−2}$s$^{−1}$, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architectur...

  9. Bioelectrochemical removal of carbon dioxide (CO2): an innovative method for biogas upgrading.

    Science.gov (United States)

    Xu, Heng; Wang, Kaijun; Holmes, Dawn E

    2014-12-01

    Innovative methods for biogas upgrading based on biological/in-situ concepts have started to arouse considerable interest. Bioelectrochemical removal of CO2 for biogas upgrading was proposed here and demonstrated in both batch and continuous experiments. The in-situ biogas upgrading system seemed to perform better than the ex-situ one, but CO2 content was kept below 10% in both systems. The in-situ system's performance was further enhanced under continuous operation. Hydrogenotrophic methanogenesis and alkali production with CO2 absorption could be major contributors to biogas upgrading. Molecular studies showed that all the biocathodes associated with biogas upgrading were dominated by sequences most similar to the same hydrogenotrophic methanogen species, Methanobacterium petrolearium (97-99% sequence identity). Conclusively, bioelectrochemical removal of CO2 showed great potential for biogas upgrading. Copyright © 2014 Elsevier Ltd. All rights reserved.

  10. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  11. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    Spannagel, Simon

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  12. MPC for LPV Systems Based on Parameter-Dependent Lyapunov Function with Perturbation on Control Input Strategy

    Directory of Open Access Journals (Sweden)

    Pornchai Bumroongsri

    2012-04-01

    Full Text Available In this paper, the model predictive control (MPC algorithm for linear parameter varying (LPV systems is proposed. The proposed algorithm consists of two steps. The first step is derived by using parameter-dependent Lyapunov function and the second step is derived by using the perturbation on control input strategy. In order to achieve good control performance, the bounds on the rate of variation of the parameters are taken into account in the controller synthesis. An overall algorithm is proved to guarantee robust stability. The controller design is illustrated with two case studies of continuous stirred-tank reactors. Comparisons with other MPC algorithms for LPV systems have been undertaken. The results show that the proposed algorithm can achieve better control performance.

  13. Applications of small computers for systems control on the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Bork, R.G.; Kane, R.J.; Moore, T.L.

    1983-01-01

    Desktop computers operating into a CAMAC-based interface are used to control and monitor the operation of the various subsystems on the Tandem Mirror Experiment-Upgrade (TMX-U) at Lawrence Livermore National Laboratory (LLNL). These systems include: shot sequencer/master timing, neutral beam control (four consoles), magnet power system control, ion-cyclotron resonant heating (ICRH) control, thermocouple monitoring, getter system control, gas fueling system control, and electron-cyclotron resonant heating (ECRH) monitoring. Two additional computers are used to control the TMX-U neutral beam test stand and provide computer-aided repair/test and development of CAMAC modules. These machines are usually programmed in BASIC, but some codes have been interpreted into assembly language to increase speed. Details of the computer interfaces and system complexity are described as well as the evolution of the systems to their present states

  14. Input-to-State Stabilizing MPC for Neutrally Stable Linear Systems subject to Input Constraints

    NARCIS (Netherlands)

    Kim, Jung-Su; Yoon, Tae-Woong; Jadbabaie, Ali; Persis, Claudio De

    2004-01-01

    MPC(Model Predictive Control) is representative of control methods which are able to handle physical constraints. Closed-loop stability can therefore be ensured only locally in the presence of constraints of this type. However, if the system is neutrally stable, and if the constraints are imposed

  15. Security improvements for rail movements of SNM

    International Nuclear Information System (INIS)

    Garcia, M.R.; Gronager, J.E.; Shemigon, N.N.

    1998-01-01

    The US Department of Energy (DOE) and the Russian Special Scientific and Production State Enterprise Eleron have teamed to lead a project to enhance the overall security of Russian Ministry of Atomic Energy (MINATOM) transportation of Special Nuclear Material (SNM) shipments. The effort is called the Railcar Transportation Security Project and is part of the overall DOE Material Protection, Control, and Accounting (MPC and A) program addressing the enhancement of nuclear material control, accounting, and physical protection for Russian SNM. The goal of this MPC and A project is to significantly increase the security of Russian MINATOM highly enriched SNM rail shipments. To accomplish this, the MPC and A Railcar Transportation Security program will provide an enhanced, yet cost effective, railcar transportation security system. The system incorporates a balance between the traditional detection, communications, delay, and response security elements to significantly improve the security of MINATOM SNM shipments. The strategy of this program is to use rapid upgrades to implement mature security technologies as quickly as possible. The rapid upgrades emphasize rapidly deployable delay elements, enhanced radio communications, and intrusion detection and surveillance. Upgraded railcars have begun operation during FY98. Subsequent upgrades will build upon the rapid upgrades and eventually be integrated into a final deployed system configuration. This paper provides an overview of the program, with a summary of performance of the deployed railcars

  16. ATA upgrade to 150 MeV

    International Nuclear Information System (INIS)

    Birx, D.L.; Hawkins, S.A.; Poor, S.E.; Reginato, L.L.; Smith, M.W.

    1985-01-01

    The increased interests in upgrading the ATA accelerator has warranted a preliminary look at applying the magnetic drivers to achieve both higher energy and higher average power. The goal of this upgrade is to satisfy the FEL requirements and to keep the capability of producing a higher current beam for CPB experiments at reduced energy. ATA Note 247 showed that a possible solution to obtain higher energy was simply to add additional cells, run them at higher voltage and accept a 30 ns pulse width with about 5% energy variation. Considering the recent history of the cells and the doubling of the voltage stress that would be required at the insulator, it seemed prudent to review the overall system reliability and try a different approach

  17. Development of procedures to ensure quality and integrity in Tandem Mirror Experiment-Upgrade (TMX-U) diagnostics systems

    International Nuclear Information System (INIS)

    Coutts, G.W.; Coon, M.L.; Hinz, A.F.; Hornady, R.S.; Lang, D.D.; Lund, N.P.

    1983-01-01

    The diagnostic systems for Tandem Mirror Experiment-Upgrade (TMX-U) have grown from eleven initial systems to more than twenty systems. During operation, diagnostic system modifications are sometimes required to complete experimental objectives. Also, during operations new diagnostic systems are being developed and implemented. To ensure and maintain the quality and integrity of the data signals, a set of plans and systematic actions are being developed. This paper reviews the procedures set in place to maintain the integrity of existing data systems and ensure the performance objectives of new diagnostics being added

  18. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  19. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  20. Prototype application for the control and debugging of CMS upgrade projects

    CERN Document Server

    Mills-Howell, Dominic

    2016-01-01

    Following the high-luminosity upgrades of the LHC, many subsystems of the CMS experiment require upgrading and others are using the LHC shutdowns as an opportunity to improve performance. The upgrades, themselves, have served to highlight the exigency to attack problems that were previously unaddressed. One such problem is the need for a tool that allows the users to easily monitor, debug, and test custom hardware. Such a tool could be abstracted to work, in theory, with various hardware devices. In addition to having the added benefit of being able to support future hardware, and maintaining parallel operations with the remaining control software.

  1. Control system upgrades support better plant economics

    International Nuclear Information System (INIS)

    De Grosbois, J.; Hepburn, A.; Storey, H.; Basso, R.; Kumar, V.

    2002-01-01

    This paper (second in the series, see [1]) provides insight on how nuclear plants can achieve better efficiencies and reduced operations and maintenance (O and M) costs through focused control system upgrades. An understanding of this relationship is necessary to properly assess the economics of plant refurbishment decisions. Traditional economic feasibility assessment methods such as benefit cost analysis (BCA), internal rate of return (IRR), benefit cost ratios (B/C), or payback analysis are often performed without full consideration of project alternatives, quantified benefits, and life cycle costing. Consideration must be given to not only capital cost and project risk, but also to the potential economic benefits of new technology and added functionality offered by plant upgrades. Recent experience shows that if upgrades are focused on priority objectives, and are effectively implemented, they can deliver significant payback over the life of the plant, sometimes orders of magnitude higher than their initial capital cost. The following discussion explores some of the key issues and rationale behind upgrade decisions and their impact on improved plant efficiency and reduced O and M costs. A subsequent paper will explain how the justification for these improvements can be captured in an economic analysis and feasibility study to support strategic decision-making in a plant refurbishment context. (author)

  2. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    Science.gov (United States)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  3. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  4. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    International Nuclear Information System (INIS)

    Pandya, Kaushal; Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh; Yadav, Ratnakar K.; Mahesh, Vuppugalla; Tyagi, Himanshu; Parmar, KanuG.; Mistri, Hiren; Bhagora, Jighesh; Prajapati, Bhavesh; Patel, Kartik; Bhuyan, Manas; Gouswami, Mehul; Bandyopadhyay, Mainak; Chakraborty, Arun K.

    2017-01-01

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  5. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    Energy Technology Data Exchange (ETDEWEB)

    Pandya, Kaushal, E-mail: kpandya@ipr.res.in [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Yadav, Ratnakar K. [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Mahesh, Vuppugalla [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Tyagi, Himanshu [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Parmar, KanuG.; Mistri, Hiren [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhagora, Jighesh [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Prajapati, Bhavesh; Patel, Kartik [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhuyan, Manas [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Gouswami, Mehul [Bhakti Management Services, Gandhinagar, 382007, Gujarat (India); Bandyopadhyay, Mainak [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Chakraborty, Arun K. [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India)

    2017-01-15

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  6. New robust stable MPC using linear matrix inequalities

    Directory of Open Access Journals (Sweden)

    M.A. Rodrigues

    2000-03-01

    Full Text Available This paper addresses the stability of Model Predictive Control (MPC with output feedback. The proposed controller uses a new state-space formulation of the system, and the control problem is presented as an LMI optimization problem. The stability condition for the closed loop is included as a Lyapunov inequality. The resulting optimization problem becomes nonlinear with the inclusion of the stabilizing condition. A suboptimal solution is developed and the problem reduces to a pair of coupled LMI problems. An iterative solution that converges to a stable output feedback gain is proposed. A polytopic set of process models can be considered. A simulation example is included in the paper and shows that the proposed strategy eliminates the usual practice of enforcing robustness by detuning the MP controller.

  7. ARX MPC for people with type 1 diabetes

    DEFF Research Database (Denmark)

    Boiroux, Dimitri; Finan, Daniel Aaron; Jørgensen, John Bagterp

    Type 1 diabetes is a chronic disease characterized by a lack of production of pancreatic insulin, consequently leading to high blood glucose concentrations (hyperglycemia). Hyperglycemia has negative health effects in the long term such as eye, nerve, and kidney disease. Exogenous insulin must......, or even death. Currently, insulin administration is performed by the subject with type 1 diabetes based on infrequent glucose measurements (in the form of finger-sticks), often resulting in an unsatisfactory blood glucose control. An artificial pancreas is a medical device that injects exogenous insulin...... and insulin injection information to compute the optimal insulin administration for the current conditions. We use model predictive control (MPC) to compute the optimal insulin administration for 20 virtual type 1 diabetes subjects. The system (i.e., subject) has one manipulated input (insulin infusion rate...

  8. Extending the modeling of the anisotropic galaxy power spectrum to k = 0.4 hMpc-1

    Science.gov (United States)

    Hand, Nick; Seljak, Uroš; Beutler, Florian; Vlah, Zvonimir

    2017-10-01

    We present a model for the redshift-space power spectrum of galaxies and demonstrate its accuracy in describing the monopole, quadrupole, and hexadecapole of the galaxy density field down to scales of k = 0.4 hMpc-1. The model describes the clustering of galaxies in the context of a halo model and the clustering of the underlying halos in redshift space using a combination of Eulerian perturbation theory and N-body simulations. The modeling of redshift-space distortions is done using the so-called distribution function approach. The final model has 13 free parameters, and each parameter is physically motivated rather than a nuisance parameter, which allows the use of well-motivated priors. We account for the Finger-of-God effect from centrals and both isolated and non-isolated satellites rather than using a single velocity dispersion to describe the combined effect. We test and validate the accuracy of the model on several sets of high-fidelity N-body simulations, as well as realistic mock catalogs designed to simulate the BOSS DR12 CMASS data set. The suite of simulations covers a range of cosmologies and galaxy bias models, providing a rigorous test of the level of theoretical systematics present in the model. The level of bias in the recovered values of f σ8 is found to be small. When including scales to k = 0.4 hMpc-1, we find 15-30% gains in the statistical precision of f σ8 relative to k = 0.2 hMpc-1 and a roughly 10-15% improvement for the perpendicular Alcock-Paczynski parameter α⊥. Using the BOSS DR12 CMASS mocks as a benchmark for comparison, we estimate an uncertainty on f σ8 that is ~10-20% larger than other similar Fourier-space RSD models in the literature that use k <= 0.2 hMpc-1, suggesting that these models likely have a too-limited parametrization.

  9. In situ upgrading of heavy oil under steam injection with tetralin and catalyst

    Energy Technology Data Exchange (ETDEWEB)

    Mohammad, A.A. [Texas A and M Univ., College Station, TX (United States); Mamora, D.D. [Society of Petroleum Engineers, Richardson, TX (United States)]|[Texas A and M Univ., College Station, TX (United States)

    2008-10-15

    Steam injection has become the most successful thermal recovery method for heavy oil production. Heavy oil refineries use upgrading processes to improve oil quality. They generally involve the use of catalysts that are used to remove heavy metals, sulfur and nitrogen, or used in hydro-treating and hydro-cracking. In-situ upgrading is thought to have advantages over conventional surface upgrading technology. Experiments were performed to verify the feasibility of in-situ upgrading of heavy crude oil. A hydrogen donor called tetralin was used along with an organometallic catalyst, at steam injection temperatures and pressures normally encountered in the field. Crude oil from the Jobo Oil Field, located in Venezuela was used. The paper described the experimental methodology with reference to the injection cell; fluid injection system; fluid production system; data measurement and recording system; and experimental procedure. It also discussed the extent of upgrading by comparing the properties of the original and produced oil. Oil properties that were measured and compared included hydrogen-to-carbon ratio; heavy metal content; viscosity; and API gravity. The paper also presented a comparison of oil recovery and fluid production between all cases. It was concluded that in the field, the reaction time was significantly longer than encountered in the experiments and may lead to further upgrading, assuming the catalyst could be dispersed in the formation. 10 refs., 1 tab., 9 figs.

  10. Innovative low-mass cooling systems for the ALICE ITS Upgrade detector at CERN

    OpenAIRE

    Gomez Marzoa, Manuel; Thome, John

    2016-01-01

    The Phase-1 upgrade of the LHC to full design luminosity, planned for 2019 at CERN, requires the modernisation of the experiments around the accelerator. The Inner Tracking System (ITS), the innermost detector at the ALICE experiment, will be upgraded by replacing the current apparatus by new silicon pixels arranged in 7 cylindrical layers. Each layer is composed by multiple independent modules, named staves, which provide mechanical support and cooling to the chips. This thesis aims to devel...

  11. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  12. Physics potential of ATLAS upgrades at HL-LHC

    CERN Document Server

    Testa, Marianna; The ATLAS collaboration

    2017-01-01

    The High Luminosity-Large Hadron Collider (HL-LHC) is expected to start in 2026 and to pro- vide an integrated luminosity of 3000 fb−1 in ten years, a factor 10 more than what will be collected by 2023. This high statistics will allow ATLAS to perform precise measurements in the Higgs sector and improve searches for new physics at the TeV scale. The luminosity needed is L ∼ 7.51034 cm−2 s−1, corresponding to ∼200 additional proton-proton pile- up interactions. To face such harsh environment some sub-detectors of the ATLAS experiment will be upgraded or completely substituted. The performances of the new or upgraded ATLAS sub-detectors are presented, focusing in particular on the new inner tracker and a proposed high granularity time device. The impact of those upgrades on crucial physics measurements for HL-LHC program is also shown.

  13. An APF and MPC combined collaborative driving controller using vehicular communication technologies

    International Nuclear Information System (INIS)

    Huang, Zichao; Wu, Qing; Ma, Jie; Fan, Shiqi

    2016-01-01

    Collaborative driving is a growing domain of Intelligent Transportation Systems (ITS) which aim to navigate traffic both efficiently and safely. Cooperation between vehicles heavily rely on the comprehensive information collected. With the development of vehicular communication technologies, information can be shared between vehicles or infrastructures through Vehicle-to-Vehicle (V2V)/Vehicle-to-Infrastructure (V2I) data exchange. By taking advantage of data sharing between vehicles, this paper proposes an Artificial Potential Field (APF) and Model Predictive Control (MPC) combined controller to implement collaborative driving in complex environments. Firstly, an APF model ​containing three components is developed to describe the mutual effect and collaboration properties between vehicles and surrounding environments. Afterwards, a MPC cost function for optimized control, considering both kinematic characteristics and environmental effect conveyed by APF, is presented to address the problem of collaborative driving. Such controller is designed from the perspective of multi-objective and multi-constraint optimization which takes the vehicle motion constraints, safety and comfort requirements into consideration. The prominent advantage of the proposed approach is that it can deal with the problems of route planning and manipulating simultaneously. To validate the proposed approach, a variety of scenario simulations are conducted in MATLAB, and the performance of the proposed method are verified.

  14. Particle combinations in the LHCb Upgrade trigger

    CERN Document Server

    Zhao, Fanyi

    2017-01-01

    The LHCb experiment will be upgraded during long shutdown II (2018-2020) to process inelastic proton-proton collisions at 30MHz in a software application and run at a higher instantaneous luminosity of $2\\times 10^{33}cm^{−2}s^{−1}$. Each of these collisions will contain substantially more proton-proton interactions and charged particles. It is important to identify the decay vertices of heavy-flavour hadrons produced by the primary proton-proton interaction in an efficient, CPU-performant manner. In this project, I will learn about the LHCb trigger and experimental programme and investigate alternative models for reconstructing these vertices, which may scale more efficiently to the upgraded trigger conditions than the current model.

  15. The Upgrade of the ATLAS First Level Calorimeter Trigger

    CERN Document Server

    Yamamoto, Shimpei; The ATLAS collaboration

    2015-01-01

    The Level-1 calorimeter trigger (L1Calo) operated successfully during the first data taking phase of the ATLAS experiment at the LHC. Based on the lessons learned, a series of upgrades is planned for L1Calo to face the new challenges posed by the upcoming increases of the LHC beam energy and luminosity. The initial upgrade phase in 2013-15 includes substantial improvements to the analogue and digital signal processing to cope with baseline shifts due to signal pile-up. Additionally a newly introduced system will receive real-time data from both the upgraded L1Calo and L1Muon trigger to perform trigger algorithms based on entire event topologies. During the second upgrade phase in 2018-19 major parts of L1Calo will be rebuilt in order to exploit a tenfold increase in the available calorimeter data granularity compared to that of the current system. In this contribution we present the lessons learned during the first period of LHC data taking. Based on these we discuss the expected performance improvements toge...

  16. Catalyst study for the decontamination of glove-box atmospheres containing tritium at MPC levels

    International Nuclear Information System (INIS)

    Chobot, J.; Montel, J.; Sannier, J.

    1988-01-01

    The BEATRICE loop was designed for studying the conversion of tritium at very low activity levels using catalytic oxidation followed by water trapping. The purpose is to study kinetic parameters required for the design of the NET tritium cleanup system with the two main objectives to operate without isotopic swamping and to determine the ability of efficient conversion at room temperature. From experiments carried out between 20 and 250 0 C it is concluded that two palladium/alumina and platinum/alumina catalysts are very efficient in removing tritium from contaminated gas mixtures down to a few MPC levels without isotopic swamping and even at room temperature. However at room temperature, in relation to tritium species trapped on the catalyst surface a progressive deactivation with time occurs. This phenomenon may be a concern for process efficiency and tritium inventory and regeneration conditions have to be determined in order to demonstrate industrial feasibility of operating at room temperature

  17. Catalyst study for the decontamination of glove-boxe atmospheres containing tritium at MPC levels

    International Nuclear Information System (INIS)

    Chabot, J.; Montel, J.; Sannier, J.

    1988-01-01

    The BEATRICE loop was designed for studying the conversion of tritium at very low activity levels using catalytic oxidation followed by water trapping. The purpose is to study kinetic parameters required for the design of the NET tritium clean-up system with the two main objectives to operate without isotopic swamping and to determine the ability of efficient conversion at room temperature. From experiments carried out between 20 and 250 0 C it is concluded that two palladium/alumina and platinum/alumina catalysts are very efficient in removing tritium from contaminated gas mixtures down to a few MPC levels without isotopic swamping and even at room temperature. However at room temperature, in relation to tritium species trapped on the catalyst surface a progressive deactivation with time occurs. This phenomenon may be a concern for process efficiency and tritium inventory and best regeneration conditions have to be determined in order to demonstrate industrial feasibility of operating at room temperature

  18. Finite-Control-Set Model Predictive Control (FCS-MPC) for Islanded Hybrid Microgrids

    OpenAIRE

    Yi, Zhehan; Babqi, Abdulrahman J.; Wang, Yishen; Shi, Di; Etemadi, Amir H.; Wang, Zhiwei; Huang, Bibin

    2018-01-01

    Microgrids consisting of multiple distributed energy resources (DERs) provide a promising solution to integrate renewable energies, e.g., solar photovoltaic (PV) systems. Hybrid AC/DC microgrids leverage the merits of both AC and DC power systems. In this paper, a control strategy for islanded multi-bus hybrid microgrids is proposed based on the Finite-Control-Set Model Predictive Control (FCS-MPC) technologies. The control loops are expedited by predicting the future states and determining t...

  19. Experiences in seismic upgrading of equipment and structures in Kozloduy nuclear power plant (440 WWER-PWR)

    International Nuclear Information System (INIS)

    Ordonez Villalobos, A.

    1993-01-01

    Within the framework of the 'Emergency programme for Nuclear Safety of Kozloduy NPP' it has been concluded that the increase in seismic safety of a NPP can be achieved by upgrading the key equipment in a cost effective way. Essential and vulnerable equipment has to be identified. Seismic capacity should be evaluated base don realistic state of the art criteria. Seismic review teams ef experienced engineers should conduct planned walk-downs in order to propose effective upgrading solutions. Team work of plan engineers and construction engineers would enhance the effectiveness of the solutions. It is recommended that all the participants be motivated and have a clear understanding of the objectives of the upgrading

  20. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Jeitler, Manfred; Rabady, Dinyar; Sakulin, Hannes; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run-II of the Large Hadron Collider poses new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run-I, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new μTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (μGMT) which sorts and removes duplicates from boundaries of the muon trigger sub-systems. Furthermore, it determines how isolated the muon candidates are based on calorimetric energy deposits. The μGMT will be implemented using a processing board that features a larg...

  1. LHCb; DAQ Architecture for the LHCb Upgrade

    CERN Multimedia

    Neufeld, N

    2013-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2x 10$^{33}$ cm$^{-2}$ . s$^{-1}$. The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of HCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and (relative) cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ ...

  2. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  3. Manufacturing experience and test results of the PS prototype flexible hybrid circuit for the CMS Tracker Upgrade

    CERN Document Server

    Kovacs, Mark Istvan; Gadek, Tomasz; Honma, Alan; Vasey, Francois

    2017-01-01

    The CMS Tracker Phase-2 Upgrade for HL-LHC requires High Density Interconnect (HDI) flexible hybrid circuits to build modules with low mass and high granularity. The hybrids are carbon fibre reinforced flexible circuits with flip-chips and passives. Three different manufacturers produced prototype hybrids for the Pixel-Strip type modules. The first part of the presentation will focus on the design challenges of this state of the art circuit. Afterwards, the difficulties and experience related to the circuit manufacturing and assembly are presented. The description of quality inspection methods with comprehensive test results will lead to the conclusion.

  4. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  5. Model-based MPC enables curvilinear ILT using either VSB or multi-beam mask writers

    Science.gov (United States)

    Pang, Linyong; Takatsukasa, Yutetsu; Hara, Daisuke; Pomerantsev, Michael; Su, Bo; Fujimura, Aki

    2017-07-01

    Inverse Lithography Technology (ILT) is becoming the choice for Optical Proximity Correction (OPC) of advanced technology nodes in IC design and production. Multi-beam mask writers promise significant mask writing time reduction for complex ILT style masks. Before multi-beam mask writers become the main stream working tools in mask production, VSB writers will continue to be the tool of choice to write both curvilinear ILT and Manhattanized ILT masks. To enable VSB mask writers for complex ILT style masks, model-based mask process correction (MB-MPC) is required to do the following: 1). Make reasonable corrections for complex edges for those features that exhibit relatively large deviations from both curvilinear ILT and Manhattanized ILT designs. 2). Control and manage both Edge Placement Errors (EPE) and shot count. 3. Assist in easing the migration to future multi-beam mask writer and serve as an effective backup solution during the transition. In this paper, a solution meeting all those requirements, MB-MPC with GPU acceleration, will be presented. One model calibration per process allows accurate correction regardless of the target mask writer.

  6. Tevatron: recent results and prospects at the upgrade

    International Nuclear Information System (INIS)

    Mondal, Naba K.

    1998-01-01

    In this article, we review some of the recent results from CDF and DΦ experiments at the Tevatron and their prospects at the upgrade. Among the topics discussed are top quark physics, electroweak physics, QCD physics and new physics beyond standard model. (author)

  7. Upgrade Software and Computing

    CERN Document Server

    The LHCb Collaboration, CERN

    2018-01-01

    This document reports the Research and Development activities that are carried out in the software and computing domains in view of the upgrade of the LHCb experiment. The implementation of a full software trigger implies major changes in the core software framework, in the event data model, and in the reconstruction algorithms. The increase of the data volumes for both real and simulated datasets requires a corresponding scaling of the distributed computing infrastructure. An implementation plan in both domains is presented, together with a risk assessment analysis.

  8. A Neutral Beam for the Lithium Tokamak eXperiment Upgrade (LTX-U)

    Science.gov (United States)

    Merino, Enrique; Majeski, Richard; Kaita, Robert; Kozub, Thomas; Boyle, Dennis; Schmitt, John; Smirnov, Artem

    2015-11-01

    Neutral beam injection into tokamaks is a proven method of plasma heating and fueling. In LTX, high confinement discharges have been achieved with low-recycling lithium walls. To further improve plasma performance, a neutral beam (NB) will be installed as part of an upgrade to LTX (LTX-U). The NB will provide core plasma fueling with up to 700 kW of injected power. Requirements for accommodating the NB include the addition of injection and beam-dump ports onto the vessel and enhancement of the vacuum vessel pumping capability. Because the NB can also serve as a source of neutrals for charge-exchange recombination spectroscopy, ``active'' spectroscopic diagnostics will also be developed. An overview of these plans and other improvements for upgrading LTX to LTX-U will be presented. Supported by US DOE contracts DE-AC02-09CH11466 and DE-AC52-07NA27344.

  9. Analytical Performance Verification of FCS-MPC Applied to Power Electronic Converters

    DEFF Research Database (Denmark)

    Novak, Mateja; Dragicevic, Tomislav; Blaabjerg, Frede

    2017-01-01

    Since the introduction of finite control set model predictive control (FCS-MPC) in power electronics the algorithm has been missing an important aspect that would speed up its implementation in industry: a simple method to verify the algorithm performance. This paper proposes to use a statistical...... model checking (SMC) method for performance evaluation of the algorithm applied to power electronics converters. SMC is simple to implement, intuitive and it requires only an operational model of the system that can be simulated and checked against properties. Device under test for control algorithm...

  10. The ASDEX Upgrade ICRF system: Operational experience and developments

    International Nuclear Information System (INIS)

    Faugel, H.; Angene, P.; Becker, W.; Braun, F.; Bobkov, Vl.V.; Eckert, B.; Fischer, F.; Hartmann, D.A.; Heilmaier, G.; Kneidl, J.; Noterdaeme, J.-M.; Siegl, G.; Wuersching, E.

    2005-01-01

    The ICRF system at the ASDEX Upgrade tokamak is in operation since May 1992. Following some modifications of which the major one was the installation of 3 dB couplers it has become a reliable additional heating system. The maximum power coupled into the plasma has been raised up to 7.2 MW (90% of the installed RF power) for short pulses and up to 6.2 MW for pulses several second long with energy of up to 29 MJ. A power of 5 MW is delivered on a regular basis to replace two NBI sources

  11. The status of the LAMPF control system upgrade

    International Nuclear Information System (INIS)

    Carr, G.P.; Schaller, S.C.; Bjorklund, E.A.; Burns, M.J.; Harrison, J.F.; Rose, P.A.; Schultz, D.E.

    1987-01-01

    The upgraded Los Alamos Meson Physics Facility (LAMPF) control system is now operational. The SEL-840 computer has been removed, and all application programs are now running on VAXes. We are continuing to upgrade the control system network. We are using MicroVMS systems for distributed local control and have introduced VAXELN systems for dedicated real-time situations. Communications with both systems is based on a standardized remote procedure call interface. We have also begun to integrate the Proton Storage Ring controls with the LAMPF control system, to experiment with VAX/GPX-based workstation operator interfaces, and to investigate possible applications of artificial intelligence technology. 13 refs

  12. Preliminary result and upgrade from WISPDMX Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Le Hoang; Horns, Dieter [Institut fur Experimentalphysik, Universitat Hamburg (Germany); Lobanov, Andrei [Institut fur Experimentalphysik, Universitat Hamburg (Germany); Max-Planck-Institut fur Radioastronomie, Bonn (Germany)

    2016-07-01

    The microwave cavity experiment WISPDMX is the first direct WISP (Weakly interactive slim particles) dark matter search experiment probing the particle masses in the 0.8-2.0 eV range. The first stage of WISPDMX measurements has been completed at nominal resonant frequencies of the cavity. The upgrading of the data acquisition and analysing has been done to increase the sensitivity of the experiment. We report preliminary result from the cavity tuning at second stage of WISPDMX.

  13. LHCb: Upgrade of the LHCb calorimeter electronics

    CERN Multimedia

    Mauricio Ferre, J

    2013-01-01

    The LHCb collaboration foresees a major upgrade of the detector for the high luminosity run that should take place after 2018. Apart from the increase of the instantaneous luminosity at the interaction point of the experiment, one of the major ingredients of this upgrade is a full readout at 40MHz of the sub-detectors and the acquisition of the data by a large farm of PC. The trigger will be done by this farm and should increase the overall trigger efficiency with respect to the current detector, especially in hadronic B meson decays. A general overview of the modifications foreseen to the calorimeter system and the integration of the electromagnetic and hadronic calorimeters in this new scheme will be described.

  14. SLHC, the high-luminosity upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2009-01-01

    In the morning of February 26th a public event is organised in CERN's main auditorium with the aim of informing the particle physics community about the current status of preparation work for the future LHC luminosity upgrade (Phase 1 and Phase 2). The presentations will provide an overview of the various accelerator sub-projects, the physics potential and the experiment upgrade plans. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the SLHC project. Informing the public about the overall status of SLHC is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  15. Performance of the upgraded ultracold neutron source at Los Alamos National Laboratory and its implication for a possible neutron electric dipole moment experiment

    Science.gov (United States)

    Ito, T. M.; Adamek, E. R.; Callahan, N. B.; Choi, J. H.; Clayton, S. M.; Cude-Woods, C.; Currie, S.; Ding, X.; Fellers, D. E.; Geltenbort, P.; Lamoreaux, S. K.; Liu, C.-Y.; MacDonald, S.; Makela, M.; Morris, C. L.; Pattie, R. W.; Ramsey, J. C.; Salvat, D. J.; Saunders, A.; Sharapov, E. I.; Sjue, S.; Sprow, A. P.; Tang, Z.; Weaver, H. L.; Wei, W.; Young, A. R.

    2018-01-01

    The ultracold neutron (UCN) source at Los Alamos National Laboratory (LANL), which uses solid deuterium as the UCN converter and is driven by accelerator spallation neutrons, has been successfully operated for over 10 years, providing UCN to various experiments, as the first production UCN source based on the superthermal process. It has recently undergone a major upgrade. This paper describes the design and performance of the upgraded LANL UCN source. Measurements of the cold neutron spectrum and UCN density are presented and compared to Monte Carlo predictions. The source is shown to perform as modeled. The UCN density measured at the exit of the biological shield was 184 (32 ) UCN /cm3 , a fourfold increase from the highest previously reported. The polarized UCN density stored in an external chamber was measured to be 39 (7 ) UCN /cm3 , which is sufficient to perform an experiment to search for the nonzero neutron electric dipole moment with a one-standard-deviation sensitivity of σ (dn) =3 ×10-27e cm .

  16. Upgrade of the data acquisition system for the A2 experiment at MAMI

    Energy Technology Data Exchange (ETDEWEB)

    Neiser, Andreas; Gradl, Wolfgang [Institut fuer Kernphysik, Johann-Joachim-Becher-Weg 45, Mainz (Germany)

    2015-07-01

    The A2 collaboration at the electron accelerator MAMI in Mainz uses energy-tagged photons to produce light mesons off the nucleon. Its current data acquisition system is the major performance bottleneck under typical trigger conditions. Furthermore, the availability of spare parts is limited, which renders the maintainability for the next decade difficult. Thus, an upgraded system is desirable for A2 to achieve the upcoming experimental goals. For this upgrade, an FPGA-based solution using the TRB3 is being considered. The TRB3 is a multi-purpose 4+1 FPGA board, where four peripheral FPGAs communicate with one add-on board each. The central FPGA provides data readout via standard gigabit Ethernet and interconnection to other TRB3s via optical links. The TRB3 collaboration currently provides flexible TDC-in-FPGA firmwares with various discrimination front-ends as well as a 48 channel ADC add-on board with 60 MHz sampling rate and 10 bit resolution. Additionally, an extensive software framework for slow control and readout is available. We present energy and timing measurements with the ADC add-on board at the Crystal Ball NaI(Tl) calorimeter and compare the performance to the currently used COMPASS data acquisition system. Furthermore, we give an outlook on possible feature extraction firmwares and estimate the costs for a complete upgrade of the system.

  17. Use of wiener nonlinear MPC to control a CSTR with multiple steady state

    OpenAIRE

    Lusson Cervantes, A.; Agamennoni, O.E.; Figueroa, J.L.

    2003-01-01

    In this paper a Nonlinear Model Predictive Control based on a Wiener Model with a Piecewise Linear gain is presented. The major advantages of this algorithm is that it retains all the interesting properties of the classical linear MPC and the computations are easy to solve due to the canonical structure of the nonlinear gain. The proposed control scheme is applied to a nonlinear CSTR that presents multiple steady states.

  18. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  19. Flexibility of MFTF-B for thermal-barrier modifications and axisymmetric upgrades

    International Nuclear Information System (INIS)

    Thomassen, K.I.

    1981-01-01

    Flexibility in MFTB-B will be achieved partly by using the margins in particle and energy control designed into the machine and partly by making modest changes based on results obtained in TMX Upgrade. This latter flexibility is permitted by the schedule for vessel construction and component fabrication. The changes we might expect were determined by an examination of the processes involved in creating a thermal barrier and by speculating on the range of outcomes from TMX Upgrade experiments

  20. Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    INSPIRE-00246160

    2015-05-20

    {During the Long Shutdown 2 (LS2) of the LHC in 2018/2019, the ALICE experiment plans the installation of a novel Inner Tracking System (ITS). The upgraded detector will fully replace the current ITS having six layers by seven layers of Monolithic Active Pixel Sensors (MAPS). The upgraded ITS will have significantly improved tracking and vertexing capabilities, as well as readout rate to cope with the expected increased Pb-Pb luminosity in LHC. The choice of MAPS has been driven by the specific requirements of ALICE as a heavy ion experiment dealing with rare probes at low $p_\\mathrm{T}$. This leads to stringent requirements on the material budget of 0.3$\\%~X/X_{0}$ per layer for the three innermost layers. Furthermore, the detector will see large hit densities of $\\sim 19~\\mathrm{cm}^{-2}/\\mathrm{event}$ on average for minimum-bias events in the inner most layer and has to stand moderate radiation loads of 700 kRad TID and $1\\times 10^{13}$ 1 MeV n$_\\mathrm{eq}/\\mathrm{cm}^{2}$ NIEL at maximum. The MAPS dete...

  1. The TEXT upgrade vertical interferometer

    International Nuclear Information System (INIS)

    Hallock, G.A.; Gartman, M.L.; Li, W.; Chiang, K.; Shin, S.; Castles, R.L.; Chatterjee, R.; Rahman, A.S.

    1992-01-01

    A far-infrared interferometer has been installed on TEXT upgrade to obtain electron density profiles. The primary system views the plasma vertically through a set of large (60-cm radialx7.62-cm toroidal) diagnostic ports. A 1-cm channel spacing (59 channels total) and fast electronic time response is used, to provide high resolution for radial profiles and perturbation experiments. Initial operation of the vertical system was obtained late in 1991, with six operating channels

  2. Green technologies for the environmental upgrading of infrastructures

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2013-05-01

    Full Text Available Over the last few decades, the globalization phenomenon has determined the exponential development - from an economic, cultural and political standpoint - of traffic flows, the number of means and infrastructures involved in communication and exchange. At the same time, these represent one of the most complicated environmental issues of contemporary times, but perhaps also one of the most outstanding opportunities for setting up processes aimed at upgrading the territory and its constructions, towards environmental regeneration and social reorganization. These, in turn, would produce and spread (as in some already established examples of infrastructure upgrading innovative and more sustainable forms of urban lifestyles. The present contribution aims at illustrating the former, beginning with research and experiments involving the development of eco-friendly meta-design models for the correct employment of “green technologies” in: meta-project research for small mobility facilities; expansion and redevelopment works for the Stazione Termini; experiments in design for some energy-efficient underground metro stops in Rome.

  3. ROBUST MPC FOR STABLE LINEAR SYSTEMS

    Directory of Open Access Journals (Sweden)

    M.A. Rodrigues

    2002-03-01

    Full Text Available In this paper, a new model predictive controller (MPC, which is robust for a class of model uncertainties, is developed. Systems with stable dynamics and time-invariant model uncertainty are treated. The development herein proposed is focused on real industrial systems where the controller is part of an on-line optimization scheme and works in the output-tracking mode. In addition, the system has a time-varying number of degrees of freedom since some of the manipulated inputs may become constrained. Moreover, the number of controlled outputs may also vary during system operation. Consequently, the actual system may show operating conditions with a number of controlled outputs larger than the number of available manipulated inputs. The proposed controller uses a state-space model, which is aimed at the representation of the output-predicted trajectory. Based on this model, a cost function is proposed whereby the output error is integrated along an infinite prediction horizon. It is considered the case of multiple operating points, where the controller stabilizes a set of models corresponding to different operating conditions for the system. It is shown that closed-loop stability is guaranteed by the feasibility of a linear matrix optimization problem.

  4. Seismic upgrading of the spent fuel storage building at Kozloduy NPP

    International Nuclear Information System (INIS)

    Alexandrov, A.; Borov, V.; Jordanov, M.; Karamanski, T.; Mihaylov, K.

    2001-01-01

    The Spent Fuel Storage Building at Kozloduy NPP site has been analysed for new review level earthquake with 0.2 g peak ground acceleration (compared to the initial design basis earthquake with 0.1 g PGA). The preliminary seismic analysis of the existing building structure using the 5% site specific response spectrum showed the need of seismic structural upgrading. Two upgrading concepts were evaluated on the basis of several factors. The main factor considered was preventing the collapse of the hall structure and the travelling cranes on the fuel storage area during and after a SSE. A three dimensional finite element model was created for the investigation of the seismic response of the existing structure and for the design of the building upgrading. The modelling of the heavy travelling crane and its sub-crane structure was one of the key points. Different configurations of the new upgrading and strengthening structures were investigated. Some interesting conclusions have been drawn from the experience in analysing and upgrading of such a complex industrial structure, comprised of elements with substantial differences in material, rigidity, construction and general behaviour. (author)

  5. Approach of seismic upgrading in Kashiwazaki-Kariwa Nuclear Power Plant

    International Nuclear Information System (INIS)

    Sato, Hitoshi

    2009-01-01

    Because guide for reviewing seismic design of nuclear power reactor facilities was reworked in 2006, we formulated new Design Base Seismic Motion Ss, and we are doing evaluation of seismic safety (back-check). In Japan, depending on aseismatic importance, equipments are classified into S-class, B-class and C-class. For S-class equipments, we evaluate it on the basis of new Ss, and do seismic upgrading. For B-class and C-class equipments, we do seismic upgrading voluntarily on the basis of the experiences of the Niigataken Chuetsu-Oki (NCO) Earthquake. (author)

  6. NSTX-U Control System Upgrades

    International Nuclear Information System (INIS)

    Erickson, K.G.; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-01-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control

  7. NSTX-U Control System Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, K.G., E-mail: kerickso@pppl.gov; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-06-15

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  8. Feedback-controlled NTM stabilization on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Stober J.

    2015-01-01

    Full Text Available On ASDEX Upgrade a concept for real-time stabilization of NTMs has been realized and successfully applied to (3,2- and (2,1-NTMs. Since most of the work has meanwhile been published elsewhere, a short summary with the appropriate references is given. Limitations, deficits and future extensions of the system are discussed. In a second part the recent work on using modulated ECCD for NTM stabilisation is described in some detail. In these experiments ECCD power is modulated according to a magnetic footprint of the rotating NTM. In agreement with earlier results it could be shown that O-point heating reduces the necessary average power for stabilisation whereas X-point heating hampers stabilisation. Although this modulated scheme is not relevant for routine NTM stabilisation on ASDEX Upgrade it may be mandatory for ITER or DEMO. On ASDEX Upgrade it has been re-developed to demonstrate the usage of a FAst DIrectional Switch to continously heat the O-point of the rotating island with only one gyrotron switching between two launchers which target the mode at locations separated in phase by 180 degrees as described in [1].

  9. Maximum permissible concentration (MPC) values for spontaneously fissioning radionuclides

    International Nuclear Information System (INIS)

    Ford, M.R.; Snyder, W.S.; Dillman, L.T.; Watson, S.B.

    1976-01-01

    The radiation hazards involved in handling certain of the transuranic nuclides that exhibit spontaneous fission as a mode of decay were reaccessed using recent advances in dosimetry and metabolic modeling. Maximum permissible concentration (MPC) values in air and water for occupational exposure (168 hr/week) were calculated for 244 Pu, 246 Cm, 248 Cm, 250 Cf, 252 Cf, 254 Cf, /sup 254m/Es, 255 Es, 254 Fm, and 256 Fm. The half-lives, branching ratios, and principal modes of decay of the parent-daughter members down to a member that makes a negligible contribution to the dose are given, and all daughters that make a significant contribution to the dose to body organs following inhalation or ingestion are included in the calculations. Dose commitments for body organs are also given

  10. Characterisation of the Photon Detection System for the LHCb RICH Detector Upgrade

    CERN Document Server

    AUTHOR|(CDS)2097582; D'Ambrosio, Carmelo; Easo, Sajan

    The LHCb Experiment will be upgraded during Long Shutdown II of the Large Hadron Collider (LHC) in 2019 and 2020. The goal of the upgrade is to efficiently use the increased instantaneous luminosity in LHC Run 3 and to collect data at the proton collision rate of 40 MHz. The Ring Imaging Cherenkov (RICH) particle identification detectors will be upgraded to perform in the new operating conditions with continuing reliability. The photon detection system will be replaced using multi-anode photomultiplier tubes (MaPMTs) and associated read-out electronics. The photon detection chain was studied at CERN using a pulsed laser to test the system under high event rates and high photon intensities. The behaviour of two types of MaPMTs which are foreseen for the upgrade is presented for varying rates and intensities, and different applied bias voltages. A simulation was created to model the photon detection chain using the Geant4 simulation toolkit. The RICH Upgrade test beam using 180 GeV positive hadrons from CERN SP...

  11. ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC

    CERN Document Server

    Cerqueira, A S

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The ATLAS upgrade program is divided in three phases: The Phase~0 occurs during 2013-2014, Phase~1 during 2018-1019 and finally Phase~2, which is foreseen for 2022-2023, whereafter the peak luminosity will reach 5-7 x 10$^{34}$ cm$^2$s$^{-1}$ (HL-LHC). The main TileCal upgrade is focused on the Phase~2 period. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. All new electronics must be able to cope with the increased radiation levels. An ambitious upgrade development program is pursued to study different electronics options. Three options are presently being investigated for the front-end electronic upgrade. The first option is an improved version of the present system built using comm...

  12. Technical Design Report for the Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Abelev, B; Adamová, D; Aggarwal, M M; Aglieri Rinella, G; Agnello, M; Agostinelli, A; Agrawal, N; Ahammed, Z; Ahmad, N; Ahmad Masoodi, A; Ahmed, I; Ahn, S U; Ahn, S A; Aimo, I; Aiola, S; Ajaz, M; Akindinov, A; Aleksandrov, D; Alessandro, B; Alexandre, D; Alici, A; Alkin, A; Alme, J; Alt, T; Altini, V; Altinpinar, S; Altsybeev, I; Alves Garcia Prado, C; Anderssen, E C; Andrei, C; Andronic, A; Anguelov, V; Anielski, J; Anticic, T; Antinori, F; Antonioli, P; Aphecetche, L; Appelshäuser, H; Arbor, N; Arcelli, S; Armesto, N; Arnaldi, R; Aronsson, T; Arsene, I C; Arslandok, M; Augustinus, A; Averbeck, R; Awes, T C; Azmi, M D; Bach, M; Badalà, A; Baek, Y W; Bagnasco, S; Bailhache, R; Bairathi, V; Bala, R; Baldisseri, A; Baltasar Dos Santos Pedrosa, F; Bán, J; Baral, R C; Barbera, R; Barile, F; Barnaföldi, G G; Barnby, L S; Barret, V; Bartke, J; Basile, M; Bastian Van Beelen, J; Bastid, N; Basu, S; Bathen, B; Batigne, G; Battistin, M; Batyunya, B; Batzing, P C; Baudot, J; Baumann, C; Bearden, I G; Beck, H; Bedda, C; Behera, N K; Belikov, I; Bellini, F; Bellwied, R; Belmont-Moreno, E; Bencedi, G; Benettoni, M; Benotto, F; Beole, S; Berceanu, I; Bercuci, A; Berdnikov, Y; Berenyi, D; Berger, M E; Bertens, R A; Berzano, D; Besson, A; Betev, L; Bhasin, A; Bhati, A K; Bhatti, A; Bhattacharjee, B; Bhom, J; Bianchi, L; Bianchi, N; Bianchin, C; Bielcík, J; Bielcíková, J; Bilandzic, A; Bjelogrlic, S; Blanco, F; Blau, D; Blume, C; Bock, F; Boehmer, F V; Bogdanov, A; Boggild, H; Bogolyubsky, M; Boldizsár, L; Bombara, M; Book, J; Borel, H; Borissov, A; Bornschein, J; Borshchov, V N; Bortolin, C; Bossú, F; Botje, M; Botta, E; Böttger, S; Braun-Munzinger, P; Breitner, T; Broker, T A; Browning, T A; Broz, M; Bruna, E; Bruno, G E; Budnikov, D; Buesching, H; Bufalino, S; Buncic, P; Busch, O; Buthelezi, Z; Caffarri, D; Cai, X; Caines, H; Caliva, A; Calvo Villar, E; Camerini, P; Canoa Roman, V; Carena, F; Carena, W; Cariola, P; Carminati, F; Casanova Díaz, A; Castillo Castellanos, J; Casula, E A R; Catanescu, V; Caudron, T; Cavicchioli, C; Ceballos Sanchez, C; Cepila, J; Cerello, P; Chang, B; Chapeland, S; Charvet, J L; Chattopadhyay, S; Chattopadhyay, S; Cherney, M; Cheshkov, C; Cheynis, B; Chibante Barroso, V; Chinellato, D D; Chochula, P; Chojnacki, M; Choudhury, S; Christakoglou, P; Christensen, C H; Christiansen, P; Chujo, T; Chung, S U; Cicalo, C; Cifarelli, L; Cindolo, F; Claus, G; Cleymans, J; Colamaria, F; Colella, D; Coli, S; Colledani, C; Collu, A; Colocci, M; Conesa Balbastre, G; Conesa del Valle, Z; Connors, M E; Contin, G; Contreras, J G; Cormier, T M; Corrales Morales, Y; Cortese, P; Cortés Maldonado, I; Cosentino, M R; Costa, F; Crochet, P; Cruz Albino, R; Cuautle, E; Cunqueiro, L; Dainese, A; Dang, R; Danu, A; Da Riva, E; Das, D; Das, I; Das, K; Das, S; Dash, A; Dash, S; De, S; Decosse, C; Delagrange, H; Deloff, A; Dénes, E; D'Erasmo, G; de Barros, G O V; De Caro, A; de Cataldo, G; de Cuveland, J; De Falco, A; De Gruttola, D; De Marco, N; De Pasquale, S; De Robertis, G; De Roo, K; de Rooij, R; Diaz Corchero, M A; Dietel, T; Divià, R; Di Bari, D; Di Liberto, S; Di Mauro, A; Di Nezza, P; Djuvsland, o; Dobrin, A; Dobrowolski, T; Domenicis Gimenez, D; Dönigus, B; Dordic, O; Dorheim, S; Dorokhov, A; Doziere, G; Dubey, A K; Dubla, A; Ducroux, L; Dulinski, W; Dupieux, P; Dutta Majumdar, A K; Ehlers III, R J; Elia, D; Engel, H; Erazmus, B; Erdal, H A; Eschweiler, D; Espagnon, B; Estienne, M; Esumi, S; Evans, D; Evdokimov, S; Eyyubova, G; Fabris, D; Faivre, J; Falchieri, D; Fantoni, A; Fasel, M; Fehlker, D; Feldkamp, L; Felea, D; Feliciello, A; Feofilov, G; Ferencei, J; Fernández Téllez, A; Ferreiro, E G; Ferretti, A; Festanti, A; Figiel, J; Figueredo, M A S; Filchagin, S; Finogeev, D; Fionda, F M; Fiore, E M; Fiorenza, G; Floratos, E; Floris, M; Foertsch, S; Foka, P; Fokin, S; Fragiacomo, E; Francescon, A; Franco, M; Frankenfeld, U; Fuchs, U; Furget, C; Fusco Girard, M; Gaardhoje, J J; Gagliardi, M; Gajanana, D; Gallio, M; Gangadharan, D R; Ganoti, P; Garabatos, C; Garcia-Solis, E; Gargiulo, C; Garishvili, I; Gerhard, J; Germain, M; Gheata, A; Gheata, M; Ghidini, B; Ghosh, P; Ghosh, S K; Gianotti, P; Giubilato, P; Giubellino, P; Gladysz-Dziadus, E; Glässel, P; Gomez, R; Gomez Marzoa, M; González-Zamora, P; Gorbunov, S; Görlich, L; Gotovac, S; Graczykowski, L K; Grajcarek, R; Greiner, L C; Grelli, A; Grigoras, A; Grigoras, C; Grigoriev, V; Grigoryan, A; Grigoryan, S; Grinyov, B; Grion, N; Grondin, D; Grosse-Oetringhaus, J F; Grossiord, J -Y; Grosso, R; Guber, F; Guernane, R; Guerzoni, B; Guilbaud, M; Gulbrandsen, K; Gulkanyan, H; Gunji, T; Gupta, A; Gupta, R; H Khan, K; Haake, R; Haaland, o; Hadjidakis, C; Haiduc, M; Hamagaki, H; Hamar, G; Hanratty, L D; Hansen, A; Harris, J W; Hartmann, H; Harton, A; Hatzifotiadou, D; Hayashi, S; Heckel, S T; Heide, M; Helstrup, H; Hennes, E; Herghelegiu, A; Herrera Corral, G; Hess, B A; Hetland, K F; Hicks, B; Hillemanns, H; Himmi, A; Hippolyte, B; Hladky, J; Hristov, P; Huang, M; Hu-Guo, C; Humanic, T J; Hutter, D; Hwang, D S; Igolkin, S; Ijzermans, P; Ilkaev, R; Ilkiv, I; Inaba, M; Incani, E; Innocenti, G M; Ionita, C; Ippolitov, M; Irfan, M; Ivanov, M; Ivanov, V; Ivanytskyi, O; Jacholkowski, A; Jadlovsky, J; Jahnke, C; Jang, H J; Janik, M A; Jayarathna, P H S Y; Jena, S; Jimenez Bustamante, R T; Jones, P G; Jung, H; Junique, A; Jusko, A; Kalcher, S; Kalinak, P; Kalweit, A; Kamin, J; Kang, J H; Kaplin, V; Kar, S; Karasu Uysal, A; Karavichev, O; Karavicheva, T; Karpechev, E; Kebschull, U; Keidel, R; Keil, M; Ketzer, B; Khan, M Mohisin; Khan, P; Khan, S A; Khanzadeev, A; Kharlov, Y; Kileng, B; Kim, B; Kim, D; Kim, D W; Kim, D J; Kim, J S; Kim, M; Kim, M; Kim, S; Kim, T; Kirsch, S; Kisel, I; Kiselev, S; Kisiel, A; Kiss, G; Klay, J L; Klein, J; Klein-Bösing, C; Kluge, A; Knichel, M L; Knospe, A G; Kobdaj, C; Kofarago, M; Köhler, M K; Kollegger, T; Kolojvari, A; Kondratiev, V; Kondratyeva, N; Konevskikh, A; Kovalenko, V; Kowalski, M; Kox, S; Koyithatta Meethaleveedu, G; Kral, J; Králik, I; Kramer, F; Kravcáková, A; Krelina, M; Kretz, M; Krivda, M; Krizek, F; Krus, M; Krymov, E B; Kryshen, E; Krzewicki, M; Kucera, V; Kucheriaev, Y; Kugathasan, T; Kuhn, C; Kuijer, P G; Kulakov, I; Kumar, J; Kurashvili, P; Kurepin, A; Kurepin, A B; Kuryakin, A; Kushpil, S; Kushpil, V; Kweon, M J; Kwon, Y; Ladron de Guevara, P; Lagana Fernandes, C; Lakomov, I; Langoy, R; Lara, C; Lardeux, A; Lattuca, A; La Pointe, S L; La Rocca, P; Lea, R; Lee, G R; Legrand, I; Lehnert, J; Lemmon, R C; Lenhardt, M; Lenti, V; Leogrande, E; Leoncino, M; León Monzón, I; Lesenechal, Y; Lévai, P; Li, S; Lien, J; Lietava, R; Lindal, S; Lindenstruth, V; Lippmann, C; Lisa, M A; Listratenko, O M; Ljunggren, H M; Lodato, D F; Loddo, F; Loenne, P I; Loggins, V R; Loginov, V; Lohner, D; Loizides, C; Lopez, X; López Torres, E; Lu, X -G; Luettig, P; Lunardon, M; Luo, J; Luparello, G; Luzzi, C; M Gago, A; M Jacobs, P; Ma, R; Maevskaya, A; Mager, M; Mahapatra, D P; Maire, A; Malaev, M; Maldonado Cervantes, I; Malinina, L; Mal'Kevich, D; Maltsev, N A; Malzacher, P; Mamonov, A; Manceau, L; Manko, V; Manso, F; Manzari, V; Mapelli, A; Marchisone, M; Mares, J; Margagliotti, G V; Margotti, A; Marín, A; Marin Tobon, C A; Markert, C; Marquard, M; Marras, D; Martashvili, I; Martin, N A; Martinengo, P; Martínez, M I; Martínez García, G; Martin Blanco, J; Martynov, Y; Mas, A; Masciocchi, S; Masera, M; Maslov, M; Masoni, A; Massacrier, L; Mastroserio, A; Mattiazzo, S; Matyja, A; Mayer, C; Mazer, J; Mazumder, R; Mazza, G; Mazzoni, M A; Meddi, F; Menchaca-Rocha, A; Mercado Pérez, J; Meres, M; Miake, Y; Mikhaylov, K; Milano, L; Milosevic, J; Mischke, A; Mishra, A N; Miskowiec, D; Mitu, C M; Mlynarz, J; Mohanty, B; Molnar, L; Mongelli, M; Montaño Zetina, L; Montes, E; Morando, M; Moreira De Godoy, D A; Morel, F; Moretto, S; Morreale, A; Morsch, A; Muccifora, V; Mudnic, E; Muhammad Bhopal, F; Muhuri, S; Mukherjee, M; Müller, H; Munhoz, M G; Murray, S; Musa, L; Musinsky, J; Nandi, B K; Nania, R; Nappi, E; Nattrass, C; Nayak, T K; Nazarenko, S; Nedosekin, A; Nicassio, M; Niculescu, M; Nielsen, B S; Nikolaev, S; Nikulin, S; Nikulin, V; Nilsen, B S; Noferini, F; Nomokonov, P; Nooren, G; Nyanin, A; Nystrand, J; Oeschler, H; Oh, S; Oh, S K; Okatan, A; Olah, L; Oleniacz, J; Oliveira Da Silva, A C; Onderwaater, J; Oppedisano, C; Ortiz Velasquez, A; Oskarsson, A; Otwinowski, J; Oyama, K; Pachmayer, Y; Pachr, M; Pagano, P; Paic, G; Painke, F; Pajares, C; Pal, S K; Palmeri, A; Panati, S; Pant, D; Pantano, D; Papikyan, V; Pappalardo, G S; Park, W J; Passfeld, A; Pastore, C; Patalakha, D I; Paticchio, V; Paul, B; Pawlak, T; Peitzmann, T; Pereira Da Costa, H; Pereira De Oliveira Filho, E; Peresunko, D; Pérez Lara, C E; Peryt, W; Pesci, A; Pestov, Y; Petagna, P; Petrácek, V; Petran, M; Petris, M; Petrovici, M; Petta, C; Pham, H; Piano, S; Pikna, M; Pillot, P; Pinazza, O; Pinsky, L; Piyarathna, D B; Ploskon, M; Planinic, M; Pluta, J; Pochybova, S; Podesta-Lerma, P L M; Poghosyan, M G; Pohjoisaho, E H O; Polichtchouk, B; Poljak, N; Pop, A; Porteboeuf-Houssais, S; Porter, J; Pospisil, V; Potukuchi, B; Prasad, S K; Preghenella, R; Prino, F; Protsenko, M A; Pruneau, C A; Pshenichnov, I; Puddu, G; Puggioni, C; Punin, V; Putschke, J; Qvigstad, H; Rachevski, A; Raha, S; Rak, J; Rakotozafindrabe, A; Ramello, L; Raniwala, R; Raniwala, S; Räsänen, S S; Rascanu, B T; Rasson, J E; Rathee, D; Rauf, A W; Razazi, V; Read, K F; Real, J S; Redlich, K; Reed, R J; Rehman, A; Reichelt, P; Reicher, M; Reidt, F; Renfordt, R; Reolon, A R; Reshetin, A; Rettig, F; Revol, J -P; Reygers, K; Riabov, V; Ricci, R A; Richert, T; Richter, M; Riedler, P; Riegler, W; Riggi, F; Rivetti, A; Rocco, E; Rodríguez Cahuantzi, M; Rodriguez Manso, A; Roed, K; Rogochaya, E; Rohni, S; Rohr, D; Röhrich, D; Romita, R; Ronchetti, F; Ronflette, L; Rosnet, P; Rossegger, S; Rossewij, M J; Rossi, A; Roudier, S; Rousset, J; Roy, A; Roy, C; Roy, P; Rubio Montero, A J; Rui, R; Russo, R; Ryabinkin, E; Ryabov, Y; Rybicki, A; Sacchetti, M; Sadovsky, S; Safarík, K; Sahlmuller, B; Sahoo, R; Sahu, P K; Saini, J; Salgado, C A; Salzwedel, J; Sambyal, S; Samsonov, V; Sanchez Castro, X; Sánchez Rodríguez, F J; sándor, L; Sandoval, A; Sano, M; Santagati, G; Santoro, R; Sarkar, D; Scapparone, E; Scarlassara, F; Scharenberg, R P; Schiaua, C; Schicker, R; Schipper, J D; Schmidt, C; Schmidt, H R; Schuchmann, S; Schukraft, J; Schulc, M; Schuster, T; Schutz, Y; Schwarz, K; Schweda, K; Scioli, G; Scomparin, E; Scott, P A; Scott, R; Segato, G; Seger, J E; Selyuzhenkov, I; Senyukhov, S; Seo, J; Serradilla, E; Sevcenco, A; Sgura, I; Shabetai, A; Shabratova, G; Shahoyan, R; Shangaraev, A; Sharma, N; Sharma, S; Shigaki, K; Shtejer, K; Sibiriak, Y; Siddhanta, S; Siemiarczuk, T; Silvermyr, D; Silvestre, C; Simatovic, G; Singaraju, R; Singh, R; Singha, S; Singhal, V; Sinha, B C; Sinha, T; Sitar, B; Sitta, M; Skaali, T B; Skjerdal, K; Smakal, R; Smirnov, N; Snellings, R J M; Snoeys, W; Sogaard, C; Soltz, R; Song, J; Song, M; Sooden, V; Soramel, F; Sorensen, S; Spacek, M; spalek, J; Spiriti, E; Sputowska, I; Spyropoulou-Stassinaki, M; Srivastava, B K; Stachel, J; Stan, I; Stefanek, G; Steinpreis, M; Stenlund, E; Steyn, G; Stiller, J H; Stocco, D; Stolpovskiy, M; Strmen, P; Suaide, A A P; Subieta Vasquez, M A; Sugitate, T; Suire, C; Suleymanov, M; suljic, M; Sultanov, R; sumbera, M; Sun, X; Susa, T; Symons, T J M; Szanto de Toledo, A; Szarka, I; Szczepankiewicz, A; Szymanski, M; Takahashi, J; Tangaro, M A; Tapia Takaki, J D; Tarantola Peloni, A; Tarazona Martinez, A; Tauro, A; Tejeda Muñoz, G; Telesca, A; Terrevoli, C; Ter Minasyan, A; Thäder, J; Thomas, D; Tieulent, R; Timmins, A R; Toia, A; Torii, H; Trubnikov, V; Trzaska, W H; Tsuji, T; Tumkin, A; Turchetta, R; Turrisi, R; Tveter, T S; Tymchuk, I T; Ulery, J; Ullaland, K; Uras, A; Usai, G L; Vajzer, M; Vala, M; Valencia Palomo, L; Valentino, V; Valin, I; Vallero, S; Vande Vyvre, P; Vannucci, L; Van Der Maarel, J; Van Hoorne, J W; van Leeuwen, M; Vargas, A; Varma, R; Vasileiou, M; Vasiliev, A; Vasta, P; Vechernin, V; Veldhoen, M; Velure, A; Venaruzzo, M; Vercellin, E; Vergara Limón, S; Verlaat, B; Vernet, R; Verweij, M; Vickovic, L; Viesti, G; Viinikainen, J; Vilakazi, Z; Villalobos Baillie, O; Vinogradov, A; Vinogradov, L; Vinogradov, Y; Virgili, T; Viyogi, Y P; Vodopyanov, A; Völkl, M A; Voloshin, K; Voloshin, S A; Volpe, G; von Haller, B; Vorobyev, I; Vranic, D; Vrláková, J; Vulpescu, B; Vyushin, A; Wagner, B; Wagner, J; Wagner, V; Wang, M; Wang, Y; Watanabe, D; Weber, M; Wessels, J P; Westerhoff, U; Wiechula, J; Wikne, J; Wilde, M; Wilk, G; Wilkinson, J; Williams, M C S; Windelband, B; Winn, M; Winter, M; Xiang, C; Yaldo, C G; Yamaguchi, Y; Yang, H; Yang, P; Yang, S; Yano, S; Yasnopolskiy, S; Yi, J; Yin, Z; Yoo, I -K; Yushmanov, I; Zaccolo, V; Zach, C; Zaman, A; Zampolli, C; Zaporozhets, S; Zarochentsev, A; Závada, P; Zaviyalov, N; Zbroszczyk, H; Zgura, I S; Zhalov, M; Zhang, F; Zhang, H; Zhang, X; Zhang, Y; Zhao, C; Zherebchevsky, V I; Zhou, D; Zhou, F; Zhou, Y; Zhu, H; Zhu, J; Zhu, X; Zichichi, A; Zimmermann, A; Zimmermann, M B; Zinovjev, G; Zoccarato, Y; Zynovyev, M; Zyzak, M; CERN. Geneva. The LHC experiments Committee; LHCC

    2014-01-01

    ALICE (A Large Ion Collider Experiment) is preparing a major upgrade of its experimental apparatus, planned for installation in the second long LHC shutdown (LS2) in the years 2018-2019. These plans are presented in the ALICE Upgrade Letter of Intent submitted to the LHCC in September 2012. A key element of the upgrade is the construction of a new, ultra-light, high-resolution Inner Tracking System based on monolithic pixel detectors. This Technical Design Report is an update of the Conceptual Design Report for the Upgrade of the ALICE Inner Tracking System, which was presented to the LHCC in September 2012. The primary focus of the ITS upgrade is on the improved performance for detection of heavy-flavour hadrons, and of thermal photons and low-mass di-electrons emitted by the QGP. The Conceptual Design Report demonstrated that it is possible to build a new silicon tracker with greatly improved features in terms of determination of the distance of closest approach to the primary vertex, tracking efficiency a...

  13. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  14. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  15. Perancangan dan Implementasi Pengaturan Kecepatan Motor Brushless DC Menggunakan Metode Model Predictive Control (MPC

    Directory of Open Access Journals (Sweden)

    Fachrul Arifin

    2015-12-01

    Full Text Available Saat ini, penelitian dan pengembangan mobil listrik (electric vehicle sudah menjadi pusat perhatian bagi kalangan industri dan civitas academica. Sudah banyak kendaraan listrik yang sudah diproduksi secara massal di seluruh dunia. Beberapa dari kendaraan listrik tersebut menggunakan motor BLDC sebagai penggerak utamanya. Pada Tugas Akhir kali ini, salah satu kemampuan yang akan diteliti dan dianalisa adalah respon kecepatan motor BLDC pada mobil listrik saat mobil diberi suatu beban. Ketika mendapat pembebanan, respon kecepatan dari motor BLDC akan turun sehingga performa dari motor BLDC tidak sesuai dengan setpoint yang diharapkan. Oleh karena itu, dibutuhkan suatu kontroler yang dapat mengatasi permasalahan diatas dan melakukan pengaturan kerja pada motor BLDC agar bekerja sesuai dengan kebutuhan. Kontroler ini diharapkan mampu untuk mengembalikan respon kecepatan pada motor BLDC kembali kepada setpoint ketika motor BLDC diberi pembebanan. Penulis menggunakan metode kontroler Model Predictive Control (MPC yang dapat memprediksi perilaku sistem pada masa depan yang bergantung pada informasi sistem saat ini dan model state-space dari sistem. Berdasarkan hasil implementasi, kontroler MPC dapat memberikan respon yang sesuai dengan tracking setpoint yang diberikan dengan rata-rata nilai steady-state error sebesar 9,8% untuk semua parameter pembebanan.

  16. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  17. ANALYSIS OF MPC ACCESS REQUIREMENTS FOR ADDITION OF FILLER MATERIALS

    International Nuclear Information System (INIS)

    W. Wallin

    1996-01-01

    This analysis is prepared by the Mined Geologic Disposal System (MGDS) Waste Package Development Department (WPDD) in response to a request received via a QAP-3-12 Design Input Data Request (Ref. 5.1) from WAST Design (formerly MRSMPC Design). The request is to provide: Specific MPC access requirements for the addition of filler materials at the MGDS (i.e., location and size of access required). The objective of this analysis is to provide a response to the foregoing request. The purpose of this analysis is to provide a documented record of the basis for the response. The response is stated in Section 8 herein. The response is based upon requirements from an MGDS perspective

  18. U.S. government-to-government cooperation on nuclear materials protection, control, and accounting

    International Nuclear Information System (INIS)

    Mladineo, S.; Bricker, K.; Alberque, W.

    1996-01-01

    The US Department of Energy (DOE) is cooperating with Russia, the Newly Independent States (NIS), and the Baltics to help prevent the proliferation of nuclear weapons through the improvement of national systems of nuclear material protection, control, and accounting (MPC and A). US cooperation with Russia is carried out under the DOE MPC and A Program and the Nunn-Lugar funded Cooperative Threat Reduction program for Russia. Presidential Decision Directive (PDD)-41 designated DOE as the government agency with primary responsibility for MPC and A efforts in Russia, the NIS, and Baltics. Cooperation is conducted in coordination with the Nuclear Regulatory Commission (NRC) for the development of a strong, independent national regulatory agency in Russia. DOE also coordinates these efforts with the European Community and other countries. DOE''s cooperation under the MPC and A program with Russia includes aggressive near-term activities to better secure nuclear materials through MPC and A system upgrades at facilities. Simultaneously, DOE is supporting Russia in its long-term goal of implementing upgraded MPC and A systems that can be maintained and supported from indigenous resources. Projects include the development of national regulations and laws, training of trainers, the development of a computerized federal information system, and other related tasks. NRC''s role in these efforts includes regulatory development activities, such as licensing and inspection program development, and related training. This paper provides an overview of the activities undertaken through DOE-Russian cooperation on MPC and A and how they complement each other

  19. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  20. Deployment of the Hobby-Eberly Telescope wide-field upgrade

    Science.gov (United States)

    Hill, Gary J.; Drory, Niv; Good, John M.; Lee, Hanshin; Vattiat, Brian L.; Kriel, Herman; Ramsey, Jason; Bryant, Randy; Elliot, Linda; Fowler, Jim; Häuser, Marco; Landiau, Martin; Leck, Ron; Odewahn, Stephen; Perry, Dave; Savage, Richard; Schroeder Mrozinski, Emily; Shetrone, Matthew; DePoy, D. L.; Prochaska, Travis; Marshall, J. L.; Damm, George; Gebhardt, Karl; MacQueen, Phillip J.; Martin, Jerry; Armandroff, Taft; Ramsey, Lawrence W.

    2016-07-01

    The Hobby-Eberly Telescope (HET) is an innovative large telescope, located in West Texas at the McDonald Observatory. The HET operates with a fixed segmented primary and has a tracker, which moves the four-mirror corrector and prime focus instrument package to track the sidereal and non-sidereal motions of objects. We have completed a major multi-year upgrade of the HET that has substantially increased the pupil size to 10 meters and the field of view to 22 arcminutes by replacing the corrector, tracker, and prime focus instrument package. The new wide field HET will feed the revolutionary integral field spectrograph called VIRUS, in support of the Hobby-Eberly Telescope Dark Energy Experiment (HETDEX§), a new low resolution spectrograph (LRS2), an upgraded high resolution spectrograph (HRS2), and later the Habitable Zone Planet Finder (HPF). The upgrade is being commissioned and this paper discusses the completion of the installation, the commissioning process and the performance of the new HET.

  1. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  2. Hot-electron plasma formation and confinement in the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Ress, D.B.

    1988-01-01

    Electron-cyclotron range-of-frequency heating (ECRH) at 28 GHz is used to create a population of mirror-confined hot electrons in the Tandem Mirror Experiment-Upgrade (TMX-U). Generation of a large fraction of such electrons within each end-cell of TMX-U is essential to the formation of the desired electrostatic potential profile of the thermal-barrier tandem mirror. The formation and confinement of the ECRH-generated hot-electron plasma was investigated with a variety of diagnostic instruments, including a novel instrumented limiter probe. The author characterized the spatial structure of the hot-electron plasma. Details of the heating process cause the plasma to separate into two regions: a halo, consisting entirely of energetic electrons, and a core, which is dominated by cooler electrons. The plasma structure forms rapidly under the action of second-harmonic ECRH. Fundamental ECRH, which is typically applied simultaneously, is only weakly absorbed and generally does not create energetic electrons. The ECRH-generated plasma displays several loss mechanisms. Hot electrons in the halo region, with T e ∼ 30 keV, are formed by localized ECRH near the plasma boundary, and are lost through a radial process involving open magnetic-curvature-drift surfaces

  3. Extending the modeling of the anisotropic galaxy power spectrum to k = 0.4 h Mpc{sup −1}

    Energy Technology Data Exchange (ETDEWEB)

    Hand, Nick; Seljak, Uroš [Astronomy Department, University of California, Berkeley, CA 94720 (United States); Beutler, Florian [Institute of Cosmology and Gravitation, University of Portsmouth, Dennis Sciama Building, Portsmouth, PO1 3FX (United Kingdom); Vlah, Zvonimir, E-mail: nhand@berkeley.edu, E-mail: useljak@berkeley.edu, E-mail: florian.beutler@port.ac.uk, E-mail: zvlah@stanford.edu [Stanford Institute for Theoretical Physics and Department of Physics, Stanford University, Stanford, CA 94306 (United States)

    2017-10-01

    We present a model for the redshift-space power spectrum of galaxies and demonstrate its accuracy in describing the monopole, quadrupole, and hexadecapole of the galaxy density field down to scales of k = 0.4 h Mpc{sup −1}. The model describes the clustering of galaxies in the context of a halo model and the clustering of the underlying halos in redshift space using a combination of Eulerian perturbation theory and N -body simulations. The modeling of redshift-space distortions is done using the so-called distribution function approach. The final model has 13 free parameters, and each parameter is physically motivated rather than a nuisance parameter, which allows the use of well-motivated priors. We account for the Finger-of-God effect from centrals and both isolated and non-isolated satellites rather than using a single velocity dispersion to describe the combined effect. We test and validate the accuracy of the model on several sets of high-fidelity N -body simulations, as well as realistic mock catalogs designed to simulate the BOSS DR12 CMASS data set. The suite of simulations covers a range of cosmologies and galaxy bias models, providing a rigorous test of the level of theoretical systematics present in the model. The level of bias in the recovered values of f σ{sub 8} is found to be small. When including scales to k = 0.4 h Mpc{sup −1}, we find 15-30% gains in the statistical precision of f σ{sub 8} relative to k = 0.2 h Mpc{sup −1} and a roughly 10–15% improvement for the perpendicular Alcock-Paczynski parameter α{sub ⊥}. Using the BOSS DR12 CMASS mocks as a benchmark for comparison, we estimate an uncertainty on f σ{sub 8} that is ∼10–20% larger than other similar Fourier-space RSD models in the literature that use k ≤ 0.2 h Mpc{sup −1}, suggesting that these models likely have a too-limited parametrization.

  4. ALICE Upgrades: Plans and Potentials

    CERN Document Server

    Tieulent, Raphael

    2015-01-01

    The ALICE collaboration consolidated and completed the installation of current detectors during LS1 with the aim to accumulate 1 nb$^{-1}$ of Pb-Pb collisions during Run 2 corresponding to about 10 times the Run 1 integrated luminosity. In parallel, the ALICE experiment has a rich detector upgrade programme scheduled during the second LHC long shutdown (LS2, 2018-2019) in order to fully exploit the LHC Runs 3 and 4. The main objectives of this programme are: improving the tracking precision and enabling the read-out of all Pb-Pb interactions at a rate of up to 50 kHz, with the goal to record an integrated luminosity of 10 nb$^{-1}$ after LS2 in minimum-bias trigger mode. This sample would represent an increase by a factor of one hundred with respect to the minimum-bias sample expected during Run 2. The implementation of this upgrade programme, foreseen in LS2, includes: a new low-material Inner Tracking System at central rapidity with a forward rapidity extension to add vertexing capabilities to the current M...

  5. Sustainable and Practical Firmware Upgrade for Wireless Access Point Using Password-Based Authentication

    Directory of Open Access Journals (Sweden)

    Jaejin Jang

    2016-08-01

    Full Text Available Wireless access points (WAPs are devices that provide Internet connectivity to devices such as desktops, laptops, smartphones, and tablets. Hence, it is important to provide sufficient availability to devices and security for the traffic that is routed by a WAP. However, attackers can decrease the network bandwidth or obtain the traffic including private data such as search histories, login information, and device usage patterns by exploiting the vulnerabilities in firmware upgrades to install malicious firmware. To address this problem, we propose a sustainable and practical firmware upgrade for a WAP using password-based authentication. The proposed upgrade protocol ensures security by adding freshness to the firmware whenever a firmware upgrade occurs. This freshness is different for each event and each firmware; therefore, even if the freshness of one firmware is exposed, the others are secure. In addition, confidentiality, integrity, and authentication are ensured. Furthermore, the proposed protocol can be easily implemented and adapted to WAPs. Experiments are performed to evaluate the upgrade time, resource usage, and code size in wired and wireless connected environments by implementing a prototype and analyzing the security of the protocol. The results show that the proposed upgrade is secure and practical.

  6. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  7. MATERIAL CONTROL ACCOUNTING INMM

    Energy Technology Data Exchange (ETDEWEB)

    Hasty, T.

    2009-06-14

    Since 1996, the Mining and Chemical Combine (MCC - formerly known as K-26), and the United States Department of Energy (DOE) have been cooperating under the cooperative Nuclear Material Protection, Control and Accounting (MPC&A) Program between the Russian Federation and the U.S. Governments. Since MCC continues to operate a reactor for steam and electricity production for the site and city of Zheleznogorsk which results in production of the weapons grade plutonium, one of the goals of the MPC&A program is to support implementation of an expanded comprehensive nuclear material control and accounting (MC&A) program. To date MCC has completed upgrades identified in the initial gap analysis and documented in the site MC&A Plan and is implementing additional upgrades identified during an update to the gap analysis. The scope of these upgrades includes implementation of MCC organization structure relating to MC&A, establishing material balance area structure for special nuclear materials (SNM) storage and bulk processing areas, and material control functions including SNM portal monitors at target locations. Material accounting function upgrades include enhancements in the conduct of physical inventories, limit of error inventory difference procedure enhancements, implementation of basic computerized accounting system for four SNM storage areas, implementation of measurement equipment for improved accountability reporting, and both new and revised site-level MC&A procedures. This paper will discuss the implementation of MC&A upgrades at MCC based on the requirements established in the comprehensive MC&A plan developed by the Mining and Chemical Combine as part of the MPC&A Program.

  8. The Phase-2 ATLAS ITk Pixel Upgrade

    CERN Document Server

    Rossi, Leonardo Paolo; The ATLAS collaboration

    2018-01-01

    The upgrade of the ATLAS experiment for the operation at the High Luminosity Large Hadron Collider requires a new and more performant inner tracker, the ITk. The innermost part of this tracker will be built using silicon pixel detectors. This paper describes the ITk pixel project, which, after few years of design and test e ort, is now defined in detail.

  9. Upgrade of the ATLAS Tile Calorimeter Electronics

    International Nuclear Information System (INIS)

    Carrió, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase-II) where the peak luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expected to happen around 2024. The TileCal upgrade aims at replacing the majority of the on- and off- detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, configuration and detector control. For the off-detector electronics a pre-processor (sROD) is being developed, which takes care of the initial trigger processing while temporarily storing the main data flow in pipeline and derandomizer memories. One demonstrator prototype module with the new calorimeter module electronics, but still compatible with the present system, is planned to be inserted in ATLAS this year

  10. Explicit/multi-parametric model predictive control (MPC) of linear discrete-time systems by dynamic and multi-parametric programming

    KAUST Repository

    Kouramas, K.I.; Faí sca, N.P.; Panos, C.; Pistikopoulos, E.N.

    2011-01-01

    This work presents a new algorithm for solving the explicit/multi- parametric model predictive control (or mp-MPC) problem for linear, time-invariant discrete-time systems, based on dynamic programming and multi-parametric programming techniques

  11. The silicon vertex locator for the LHCb upgrade

    CERN Document Server

    Head, Tim

    2014-01-01

    The upgrade of the LHCb experiment, planned for 2018, will transform the entire readout to a triggerless system being read out at 40 MHz. The upgraded silicon vertex detector (VELO) must be light weight, radiation hard, and compatible with LHC vacuum requirements. It must be capable of fast pattern recognition, fast track reconstruction and high precision vertexing. This challenge is being met with a new VELO design based on hybrid pixel detectors positioned to within 5 mm of the LHC colliding beams. The detector will be shielded from the beam by a View the MathML source~300μm thick aluminium foil. Evaporative CO2 coolant circulating in micro-channels embedded in a thin silicon substrate will be used for cooling.

  12. The Layout and Performance of the Phase-II upgrade of the tracking detector of the ATLAS experiment

    CERN Document Server

    Ai, Xiaocong; The ATLAS collaboration

    2017-01-01

    HL-LHC will deliver about 3000 fb-1 of integrated luminosity in over 10 year. This will present an extremely challenging environment to the ATLAS experiment, well beyond that for which it was designed. In ATLAS Phase II upgrade, the Inner Detector will be replace by a new all-silicon Inner Tracker to maintain tracking performance in this high-occupancy environment and to cope with the increase of approximately a factor of ten in the integrated radiation dose. The ITk Detector layout is designed to meet the requirement for identifying charged particles with high efficiency and measuring their properties with high precision in the denser environment. The Layout and performance of the ITk is presented.

  13. Hot-electron plasma formation and confinement in the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Ress, D.B.

    1988-06-01

    The tandem mirror experiment-upgrade (TMX-U) at the Lawrence Livermore National Laboratory (LLNL) is the first experiment to investigate the thermal-barrier tandem-mirror concept. One attractive feature of the tandem magnetic mirror as a commercial power reactor is that the fusion reactions occur in an easily accessible center-cell. On the other hand, complicated end-cells are necessary to provide magnetohydrodynamic (MHD) stability and improved particle confinement of the center-cell plasma. In these end-cells, enhanced confinement is achieved with a particular axial potential profile that is formed with electron-cyclotron range-of-frequency heating (ECRF heating, ECRH). By modifying the loss rates of electrons at spatially distinct locations within the end-cells, the ECRH can tailor the plasma potential profile in the desired fashion. Specifically, the thermal-barrier concept requires generation of a population of energetic electrons near the midplane of each end-cell. To be effective, the transverse (to the magnetic field) spatial structure of the hot-electron plasma must be fairly uniform. In this dissertation we characterize the spatial structure of the ECRH-generated plasma, and determine how the structure builds up in time. Furthermore, the plasma should efficiently absorb the ECRF power, and a large fraction of the electrons must be well confined near the end-cell midplane. Therefore, we also examine in detail the ECRH power balance, determining how the ECRF power is absorbed by the plasma, and the processes through which that power is confined and lost. 43 refs., 69 figs., 6 tabs

  14. Innovative low-mass cooling systems for the ALICE ITS Upgrade detector at CERN

    CERN Document Server

    Gomez Marzoa, Manuel

    The Phase-1 upgrade of the LHC to full design luminosity, planned for 2019 at CERN, requires the modernisation of the experiments around the accelerator. The Inner Tracking System (ITS), the innermost detector at the ALICE experiment, will be upgraded by replacing the current apparatus by new silicon pixels arranged in 7 cylindrical layers. Each layer is composed by multiple independent modules, named staves, which provide mechanical support and cooling to the chips. This thesis aims to develop and validate experimentally an ultra-lightweight stave cooling system for the ITS Upgrade. The moderate thermal requirements, with a nominal power density of 0.15 W/cm^2 and a maximum chip temperature of 30ºC, are counterweighted by extreme low-mass restrictions, obliging to resort to lightweight, non-metallic materials, such as carbon fibre-reinforced polymers and plastics. Novel lightweight stave concepts were developed and experimentally validated, meeting the thermal requirements with minimal material inventory. T...

  15. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  16. Tandem mirror experiment-upgrade neutral beam test stand: a powerful tool for development and quality assurance

    International Nuclear Information System (INIS)

    Hibbs, S.M.; Kane, R.J.; Kerr, R.G.; Poulsen, P.

    1983-01-01

    During construction of the Tandem Mirror Experiment-Upgrade (TMX-U), we assembled a test stand to develop electronics for the neutral beam system. In the first six months of test stand use we operated a few neutral beam injector modules and directed considerable effort toward improving the electronic system. As system development progressed, our focus turned toward improving the injector modules themselves. The test stand has proved to be the largest single contributor to the successful operation of neutral beams on TMX-U, primarily because it provides quality assurance andd development capability in conjunction with the scheduled activities of the main experiment. This support falls into five major categories: (1) electronics development, (2) operator training, (3) injector module testing and characterization, (4) injector module improvements, and (5) physics improvements (through areas affected by injector operation). Normal day-to-day operation of the test stand comes under the third category, testing and characterization, and comprises our final quality assurance activity for newly assembled or repaired modules before they are installed on TMX-U

  17. LHCB : The upgraded LHCb RICH detector: status and perspectives

    CERN Multimedia

    Cardinale, Roberta

    2015-01-01

    The LHCb experiment is designed to perform high-precision measurements of CP violation and search for New Physics using the enormous flux of beauty and charmed hadrons produced at the Large Hadron Collider (LHC). The two RICH detectors installed in LHCb have performed successfully during the 2010-2012 data taking period. The data from these detectors were essential to most of the physics results published by LHCb. In order to extend its potential for discovery and study of new phenomena it is planned to upgrade the LHCb experiment in 2018 with a 40MHz readout and a much more flexible software-based triggering system. This would increase the readout rate and occupancies for the RICH detectors. The RICH detector will require new photon detectors and modifications of the optics of the upstream RICH detector. Tests of the complete opto-electronic chain have been performed during testbeam sessions in autumn 2014. The status and perspectives of the RICH upgrade project will be presented.

  18. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  19. The upgrade of the LHCb trigger system

    CERN Document Server

    INSPIRE-00259834; Fitzpatrick, C.; Gligorov, V.; Raven, G.

    2014-10-20

    The LHCb experiment will operate at a luminosity of $2\\times10^{33}$ cm$^{-2}$s$^{-1}$ during LHC Run 3. At this rate the present readout and hardware Level-0 trigger become a limitation, especially for fully hadronic final states. In order to maintain a high signal efficiency the upgraded LHCb detector will deploy two novel concepts: a triggerless readout and a full software trigger.

  20. Upgrading of fire safety in nuclear power plants. Proceedings of an International Symposium

    International Nuclear Information System (INIS)

    1998-04-01

    The document includes 40 papers presented at the International Symposium on Upgrading of Fire Safety in Nuclear Power Plants held in Vienna between 18-21 November 1997. The symposium presentations were grouped in 6 sessions: Fire safety reviews (5 papers), Fire safety analysis - Methodology (6 papers), Fire safety analysis - Applications (3 papers), Panel 1 - Identification of deficiencies in fire safety in nuclear power plants - Operational experience and data (7 papers), Panel 2 - Experience based data in fire safety assessment - Fire safety regulations and licensing (7 papers), Upgrading programmes (10 papers), and a closing session (2 papers). A separate abstract was prepared for each paper

  1. Upgrading of fire safety in nuclear power plants. Proceedings of an International Symposium

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The document includes 40 papers presented at the International Symposium on Upgrading of Fire Safety in Nuclear Power Plants held in Vienna between 18-21 November 1997. The symposium presentations were grouped in 6 sessions: Fire safety reviews (5 papers), Fire safety analysis - Methodology (6 papers), Fire safety analysis - Applications (3 papers), Panel 1 - Identification of deficiencies in fire safety in nuclear power plants - Operational experience and data (7 papers), Panel 2 - Experience based data in fire safety assessment - Fire safety regulations and licensing (7 papers), Upgrading programmes (10 papers), and a closing session (2 papers). A separate abstract was prepared for each paper Refs, figs, tabs

  2. Doosan Experience on I and C Upgrade for Operating NPPs: Control Rod Control System and Automatic Seismic Trip System

    International Nuclear Information System (INIS)

    Nam, C.H.; Kim, K.H.; Lee, D.H.

    2012-01-01

    This paper describes DHIC's experience on upgrading 3 coil type control rod control system(CRCS), 4 coil type control element drive mechanism control system(CEDMCS) and automatic seismic trip system(ASTS). Common main feature of the above systems are full duplex system to prevent unwanted trip and mis-operation. 5 CRCS and CEDMCS have been supplied to Kori 1,2, Ulchin 1,2 and Younggwang 3 since 2010 and 7 CEDMCS are contracted to supply Korea Hydro and Nuclear Power Co.(KHNP) site. Also 16 ASTS are supplied and 12 ASTS will be supplied to operating and new NPPs within 3 years. (author)

  3. Upgrade trigger & reconstruction strategy: 2017 milestone

    CERN Document Server

    Albrecht, Johannes; Campora Perez, Daniel Hugo; Cattaneo, Marco; Marco, Clemencic; Couturier, Ben; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Hill, Donal; Jones, Christopher Rob; Lemaitre, Florian; Lupton, Olli; Matev, Rosen; Pearce, Alex; Polci, Francesco; Promberger, Laura; Ponce, Sebastien; Quagliani, Renato; Raven, Gerhard; Sciascia, Barbara; Schiller, Manuel Tobias; Stahl, Sascha; Szymanski, Maciej Pawel; Chefdeville, Maximilien

    2018-01-01

    The LHCb collaboration is currently preparing an update of the experiment to take data in Run 3 of the LHC. The dominant feature of this upgrade is a trigger-less readout of the full detector followed by a full software trigger. To make optimal use of the collected data, the events are reconstructed at the inelastic collision rate of 30 MHz. This document presents the baseline trigger and reconstruction strategy as of the end of 2017.

  4. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D project

    International Nuclear Information System (INIS)

    Casse, G

    2014-01-01

    The ATLAS upgrade Planar Pixel Sensors (PPS) project aims to prove the suitability of silicon detectors processed with planar technology to equip all layers of the pixel vertex detector proposed for the upgrade of the ATLAS experiment for the future High Luminosity LHC at CERN (HL-LHC). The detectors need to be radiation tolerant to the extreme fluences expected to be received during the experimental lifetime, with optimised geometry for full coverage and high granularity and affordable in term of cost, due to the relatively large area of the upgraded ATLAS detector system. Here several solutions for the detector geometry and results with radiation hard technologies (n-in-n, n-in-p) are discussed

  5. Tandem Mirror Experiment-Upgrade neutral beam test stand: A powerful tool for development and quality assurance

    International Nuclear Information System (INIS)

    Hibbs, S.M.; Kane, R.J.; Kerr, R.G.; Poulsen, P.

    1983-01-01

    During construction of the Tandem Mirror Experiment-Upgrade (TMX-U), a test stand was assembled to develop electronics for the neutral beam system. In the first six months of test stand use the authors operated a few neutral beam injector modules and directed considerable effort toward improving the electronic system. As system development progressed, the focus turned toward improving the injector modules themselves. The test stand has proved to be the largest single contributor to the successful operation of neutral beams on TMX-U, primarily because it provides quality assurance and development capability in conjunction with the scheduled activities of the main experiment. This support falls into five major categories: (1) electronics development, (2) operator training, (3) injector module testing and characterization, (4) injector module improvements, and (5) physics improvements (through areas affected by injector operation). Normal day-to-day operation of the test stand comes under the third category, testing and characterization, and comprises the final quality assurance activity for newly assembled or repaired modules before they are installed on TMX-U. They have also used the test stand to perform a series of physics experiments, including: reducing gas flow through valve and arc chamber characterization, reducing impurities by titanium gettering, and reducing streaming gas using apertures and collisional gas dynamics

  6. Operating experience of upgraded radio frequency source at 76 MHz coupled to heavy ion RFQ

    International Nuclear Information System (INIS)

    Pande, Manjiri; Shiju, A.; Patel, N.R.; Shrotriya, S.D.; Bhagwat, P.V.

    2015-01-01

    A heavy ion radio frequency quadrupole (RFQ) accelerator has been developed at BARC (BARC). A RF source which was designed and developed at 76 MHz earlier, has been upgraded and coupled to heavy ion RFQ successfully. The DC bias supplies of this source have been replaced with new supplies having high efficiency and well filteration against RF interference (RFI). The driver of main power amplifier has been replaced with indigenously designed and developed unit. The earlier introduced microcontroller based interlock experienced RF noise issues. So, this circuit has been modified with the new circuit. With these modifications, the performance of the RF source was improved. Additionally, a separate low power RF source of around 100 + Watt was designed, developed and integrated with RFQ for its RF conditioning. This paper describes the details of up gradation of technologies implemented and coupling experience of this RF source with heavy ion RFQ. (author)

  7. MPC&A training needs of the NIS/Baltics States.

    Energy Technology Data Exchange (ETDEWEB)

    Beck, David Franklin; Stoy-McLeod, Carol L.

    2006-07-01

    This report serves to document contract deliverables considered to be of continuing interest associated with two workshops conducted as part of an initial assessment of Material Protection, Control, and Accounting (MPC&A) training needs of the Newly Independent and Baltic States (NIS/Baltics). These workshops were held in Kiev, Ukraine, ca. 2003-2004, with the assistance of personnel from the George Kuzmycz Training Center (GKTC) of the Kiev Institute of Nuclear Research (KINR). Because of the dominant role Ukraine plays in the region in terms of the nuclear industry, one workshop focused exclusively on Ukrainian training needs, with participants attending from twelve Ukrainian organizations (plus U.S. DOE/NNSA representatives). The second workshop included participation by a further ten countries from the NIS/Baltics region. In addition, the training needs data developed during the workshop were supplemented by the outcomes of surveys and studies conducted by the GKTC.

  8. FERMILAB: Tevatron upgrade; Magnetic precession in bent crystals

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1993-01-15

    The Fermilab accelerator complex is in the middle of a major upgrade to increase the luminosity beyond the original design goal. During Phase I of this upgrade, there have been major modifications to the Tevatron. These modifications were commissioned at the start of the latest collider run and include the installation of electrostatic separators to separate the orbits of the stored beams and new low beta insertions to squeeze the colliding proton and antiproton beams at both experiment interaction regions. These modifications have already enabled the Tevatron to achieve a record peak luminosity of 6.93 x 10{sup 30} per sq cm per s and a record weekly integrated luminosity of 10{sup 60} inverse nanobarns. The peak goal for the present run of 5.0 x 10{sup 30} has already been exceeded.

  9. FERMILAB: Tevatron upgrade; Magnetic precession in bent crystals

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The Fermilab accelerator complex is in the middle of a major upgrade to increase the luminosity beyond the original design goal. During Phase I of this upgrade, there have been major modifications to the Tevatron. These modifications were commissioned at the start of the latest collider run and include the installation of electrostatic separators to separate the orbits of the stored beams and new low beta insertions to squeeze the colliding proton and antiproton beams at both experiment interaction regions. These modifications have already enabled the Tevatron to achieve a record peak luminosity of 6.93 x 10 30 per sq cm per s and a record weekly integrated luminosity of 10 60 inverse nanobarns. The peak goal for the present run of 5.0 x 10 30 has already been exceeded

  10. An Upgraded ATLAS Central Trigger for 2015 Luminosities

    International Nuclear Information System (INIS)

    Poettgen, Ruth; Gutenberg, Johannes

    2013-06-01

    The Central Trigger Processor (CTP) is a core unit of the first of three levels that constitute the ATLAS trigger system. Based on information from calorimeter and muon trigger processors as well as from some additional systems it produces the level-1 trigger decision and prompts the read-out of the sub-detectors. The increase in luminosity at the LHC has pushed the CTP operation to its design limits. In order to still satisfy the physics goals of the experiment after the shutdown of the LHC of 2013/2014 the CTP will be upgraded during this period. This article discusses the current Central Trigger Processor, the motivation for the upgrade, and the changes foreseen to meet the requirements of the post-2014 physics runs at the LHC. (authors)

  11. Conceptual Design of the LHC Interaction Region Upgrade Phase-I

    CERN Document Server

    Ostojic, R; Baglin, V; Ballarino, A; Cerutti, F; Denz, R; Fartoukh, S; Fessia, P; Foraz, K; Fürstner, M; Herr, Werner; Karppinen, M; Kos, N; Mainaud-Durand, H; Mereghetti, A; Muttoni, Y; Nisbet, D; Prin, H; Tock, J P; Van Weelderen, R; Wildner, E

    2008-01-01

    The LHC is starting operation with beam. The primary goal of CERN and the LHC community is to ensure that the collider is operated efficiently and that it achieves nominal performance in the shortest term. Since several years the community has been discussing the directions for maximizing the physics reach of the LHC by upgrading the experiments, in particular ATLAS and CMS, the LHC machine and the CERN proton injector complex, in a phased approach. The first phase of the LHC interaction region upgrade was approved by Council in December 2007. This phase relies on the mature Nb-Ti superconducting magnet technology with the target of increasing the LHC luminosity to 2 to 3 10^34 cm^-2s^-1, while maximising the use of the existing infrastructure. In this report, we present the goals and the proposed conceptual solutions for the LHC IR Upgrade Phase-I which include the recommendations of the conceptual design review.

  12. Primary Vertex Reconstruction for Upgrade at LHCb

    CERN Document Server

    Wanczyk, Joanna

    2016-01-01

    The aim of the LHCb experiment is the study of beauty and charm hadron decays with the main focus on CP violating phenomena and searches for physics beyond the Standard Model through rare decays. At the present, the second data taking period is ongoing, which is called Run II. After 2018 during the long shutdown, the replacement of signicant parts of the LHCb detector is planned. One of main changes is upgrade of the present software and hardware trigger to a more rapid full software trigger. Primary Vertex (PV) is a basis for the further tracking and it is sensitive to the LHC running conditions, which are going to change for the Upgrade. In particular, the center-of-mass collision energy should reach the maximum value of 14 TeV. As a result the quality of the reconstruction has to be studied and the reconstruction algorithms have to be optimized.

  13. Robust MPC with Output Feedback of Integrating Systems

    Directory of Open Access Journals (Sweden)

    J. M. Perez

    2012-01-01

    Full Text Available In this work, it is presented a new contribution to the design of a robust MPC with output feedback, input constraints, and uncertain model. Multivariable predictive controllers have been used in industry to reduce the variability of the process output and to allow the operation of the system near to the constraints, where it is usually located the optimum operating point. For this reason, new controllers have been developed with the objective of achieving better performance, simpler control structure, and robustness with respect to model uncertainty. In this work, it is proposed a model predictive controller based on a nonminimal state space model where the state is perfectly known. It is an infinite prediction horizon controller, and it is assumed that there is uncertainty in the stable part of the model, which may also include integrating modes that are frequently present in the process plants. The method is illustrated with a simulation example of the process industry using linear models based on a real process.

  14. Upgrades of the ATLAS trigger system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2018-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  15. Alberta oil sands crudes : upgrading and marketing

    International Nuclear Information System (INIS)

    Ashar, M.

    2008-01-01

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs

  16. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  17. A Silicon Strip Detector for the Phase II High Luminosity Upgrade of the ATLAS Detector at the Large Hadron Collider

    CERN Document Server

    INSPIRE-00425747; McMahon, Stephen J

    2015-01-01

    ATLAS is a particle physics experiment at the Large Hadron Collider (LHC) that detects proton-proton collisions at a centre of mass energy of 14 TeV. The Semiconductor Tracker is part of the Inner Detector, implemented using silicon microstrip detectors with binary read-out, providing momentum measurement of charged particles with excellent resolution. The operation of the LHC and the ATLAS experiment started in 2010, with ten years of operation expected until major upgrades are needed in the accelerator and the experiments. The ATLAS tracker will need to be completely replaced due to the radiation damage and occupancy of some detector elements and the data links at high luminosities. These upgrades after the first ten years of operation are named the Phase-II Upgrade and involve a re-design of the LHC, resulting in the High Luminosity Large Hadron Collider (HL-LHC). This thesis presents the work carried out in the testing of the ATLAS Phase-II Upgrade electronic systems in the future strips tracker a...

  18. Analysis Efforts Supporting NSTX Upgrades

    International Nuclear Information System (INIS)

    Zhang, H.; Titus, P.; Rogoff, P.; Zolfaghari, A.; Mangra, D.; Smith, M.

    2010-01-01

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  19. Upgrade and modernization of NBSR

    International Nuclear Information System (INIS)

    Williams, Robert E.

    1995-01-01

    The NBSR, a 20-MW research reactor operated by the National Institute of Standards and Technology, has become the leading US laboratory in neutron research. About 1000 scientists from 200 industries, government and foreign laboratories, and universities conducted experiments at the NBSR in 19931. Since 1990, when the first instruments in the Cold Neutron Research Facility (CNRF) became available, the number of research participants has doubled. A major program of modernization and facility upgrade was initiated in order to meet this growing demand, and to assure safe and reliable reactor operations for 30 additional years. A scheduled shutdown, begun in late May 1994, is nearing completion at this writing (May 1995). To upgrade the CNRF, the D 2 0 cold neutron source has been replaced with a liquid hydrogen cold source, and the remaining four neutron guides are being installed. In addition, the primary and secondary cooling systems have been modernized with the installation of plate heat exchangers, and the refueling system has been completely refurbished. Periodic maintenance is also being done. The entire D20 primary coolant inventory is about to be replaced, and new shim arms have been installed

  20. The FELIX experimental program and future upgrades

    International Nuclear Information System (INIS)

    Turner, L.R.; Praeg, W.F.; Lari, R.J.; Wehrle, R.B.

    1981-01-01

    As part of the DOE First Wall/Blanket/Shield (FW/B/S) Engineering Test Program, Argonne National Laboratory FELIX (Fusion ELectromagnetic Induction EXperiment to study electromagnetic effects. T.he earliest test will select and verify appropriate eddy current simulation computer program (codes), followed by component concept tests, component model tests, and finally tests with prototypes. This paper describes the experimental and computer code plans and future upgrades for the FELIX facility

  1. To upgrade or not to upgrade

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn; Rose, Jørgen

    2017-01-01

    This paper identifies the key indicators that owners need to take into account in order to choose the most affordable extent of upgrading of a typical post-1945 building. The exterior look of the building is not to be changed. Indicators include measures, risk assessment related to the changes in...

  2. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  3. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    for upgrading an uncompetitive product, and combine the solutions into a single solution. We also propose a spatial join-based solution that assumes P and T are indexed by an R-tree. Given a set of products in the same R-tree node, we derive three lower bounds on their upgrading costs. These bounds are employed...

  4. Explicit/multi-parametric model predictive control (MPC) of linear discrete-time systems by dynamic and multi-parametric programming

    KAUST Repository

    Kouramas, K.I.

    2011-08-01

    This work presents a new algorithm for solving the explicit/multi- parametric model predictive control (or mp-MPC) problem for linear, time-invariant discrete-time systems, based on dynamic programming and multi-parametric programming techniques. The algorithm features two key steps: (i) a dynamic programming step, in which the mp-MPC problem is decomposed into a set of smaller subproblems in which only the current control, state variables, and constraints are considered, and (ii) a multi-parametric programming step, in which each subproblem is solved as a convex multi-parametric programming problem, to derive the control variables as an explicit function of the states. The key feature of the proposed method is that it overcomes potential limitations of previous methods for solving multi-parametric programming problems with dynamic programming, such as the need for global optimization for each subproblem of the dynamic programming step. © 2011 Elsevier Ltd. All rights reserved.

  5. A fundamental research for upgrading heavy oil using syngas as hydrogen source

    Energy Technology Data Exchange (ETDEWEB)

    Yan, D.; Yuan, M.; Sun, X.; Zhao, S. [China Univ. of Petroleum, Beijing (China). State Key Laboratory of Heavy Oil Processing

    2006-07-01

    The stock of heavy oil and residue from petroleum fractions has become more important as a component in supplying demands for fuel and petrochemical feeds. Finding economical means of upgrading heavy oils is extremely important in order to ensure future fuel supply. A number of new technologies for upgrading heavy oils have been evaluated, including residual fluid catalytic cracking (RFCC), hydrogenation, thermal conversion, and solvent deasphalting. However, the commercial application of such technologies is mainly constrained by the metal and residual carbon concentrations that are present in all heavy oils. Conventional technologies used to upgrade vacuum residue (VR) result in heavy coke formation, with a consequential reduction in the life of expensive, high-performance catalysts. The hydro upgrading process can significantly remove the concentration of heteroatom such as sulfur, nitrogen, and metals in the liquid products. This paper investigated upgrading of heavy oil using syngas as an alternative hydrogen source with a dispersed catalyst. The paper discussed the experiment with reference to the feedstock and catalyst precursors; finely dispersed catalysts preparation; experimental apparatus; experimental design and procedure; and analysis. The results were presented in terms of effects of catalyst dispersion; effect of hydro-upgrading heavy oil using syngas as alternative source; and effects of different catalysts on residue hydrocracking. Last, the paper discussed the properties of the hydrocracked oil treated with syngas. The study confirmed the effectiveness of the slurry bed hydrocracking catalyst using syngas as a hydrogen source. 23 refs., 8 tabs., 16 figs.

  6. The CMS ECAL Upgrade for Precision Crystal Calorimetry at the HL-LHC

    CERN Document Server

    Marinelli, Nancy

    2017-01-01

    The Compact Muon Solenoid Experiment (CMS) is operating at the Large Hadron Collider (LHC) with proton-proton collisions at 13 TeV center-of-mass energy and at a bunch spacing of 25 ns. New further challenging running conditions for CMS are expected after the High-Luminosity upgrade of the LHC (HL--LHC). The CMS electromagnetic calorimeter (ECAL) will need to be upgraded to substain the hardned environment.The design and R\\ and D studies for the ECAL upgrade are presented together with first test beam studies. Particular challenges at HL--LHC are the harsh radiation environment, the increasing data rates and the extreme level of pile-up events, with up to 200 simultaneous proton-proton collisions. Precision timing can be exploited to reduce the effect of the pile-up. Time resolution measurementscarried out during test-beams are shown. Plans are also shown for R\\ and D for the new readout and trigger electronics, which must be upgraded due to the increased trigger and latency requirements at the HL--LHC

  7. Determination of the design excess reactivity for the TREAT Upgrade reactor

    International Nuclear Information System (INIS)

    Bhattacharyya, S.K.; Hanan, N.A.

    1983-01-01

    The excess reactivity designed to be built into a reactor core is a primary determinant of the fissile loadings of the fuel rods in the core. For the TREAT Upgrade (TU) reactor the considerations that enter into the determination of the excess reactivity are different from those of conventional power reactors. The reactor is designed to operate in an adiabatic transient mode for reactor safety in-pile test programs. The primary constituent of the excess reactivity is the calculated reactivity required to perform the most demanding transient experiments. Because of the unavailability of supporting critical experiments for the core design, the uncertainty terms that add on to this basic constituent are rather large. The burnup effects in TU are negligible and no refueling is planned. In this paper the determination of the design excess reactivity of the TREAT Upgrade reactor is discussed

  8. Upgrading the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Popeneciu, G; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at LHC. Around 2023, after the upgrade of the LHC (High Luminosity LHC, phase 2) the peak luminosity will increase by a factor of 5 compared to the design value (1034 cm-2 s-1), thus requiring an upgrade of the TileCal readout electronics. Except the 9852 photomultipliers (PMTs), most of the on- and off-detector electronics will be replaced, with the aim of digitizing all PMT pulses at 40 MHz at the front-end level and sending them with 10 Gbps optical links to the back-end electronics. Moreover, to increase reliability, redundancy will be introduced at different levels. Three different options are currently being investigated for the front-end electronics and extensive test beam studies are planned to select the best option. One demonstrator prototype module is also planned to be inserted in TileCal in 2014 that will include hybrid electronic components able to probe the new design, but still compatible with the presen...

  9. The ASDEX upgrade digital video processing system for real-time machine protection

    Energy Technology Data Exchange (ETDEWEB)

    Drube, Reinhard, E-mail: reinhard.drube@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Neu, Gregor [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard H.; Lüddecke, Klaus [Unlimited Computer Systems GmbH, Seeshaupterstr. 15, 82393 Iffeldorf (Germany); Lunt, Tilmann; Herrmann, Albrecht [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-11-15

    Highlights: • We present the Real-Time Video diagnostic system of ASDEX Upgrade. • We show the implemented image processing algorithms for machine protection. • The way to achieve a robust operating multi-threading Real-Time system is described. -- Abstract: This paper describes the design, implementation, and operation of the Video Real-Time (VRT) diagnostic system of the ASDEX Upgrade plasma experiment and its integration with the ASDEX Upgrade Discharge Control System (DCS). Hot spots produced by heating systems erroneously or accidentally hitting the vessel walls, or from objects in the vessel reaching into the plasma outer border, show up as bright areas in the videos during and after the reaction. A system to prevent damage to the machine by allowing for intervention in a running discharge of the experiment was proposed and implemented. The VRT was implemented on a multi-core real-time Linux system. Up to 16 analog video channels (color and b/w) are acquired and multiple regions of interest (ROI) are processed on each video frame. Detected critical states can be used to initiate appropriate reactions – e.g. gracefully terminate the discharge. The system has been in routine operation since 2007.

  10. A megawatt-level 28 GHz heating system for the National Spherical Torus Experiment Upgrade

    Directory of Open Access Journals (Sweden)

    Taylor G.

    2015-01-01

    Full Text Available The National Spherical Torus Experiment Upgrade (NSTX-U will operate at axial toroidal fields of ≤ 1 T and plasma currents, Ip ≤ 2 MA. The development of non-inductive (NI plasmas is a major long-term research goal for NSTX-U. Time dependent numerical simulations of 28 GHz electron cyclotron (EC heating of low density NI start-up plasmas generated by Coaxial Helicity Injection (CHI in NSTX-U predict a significant and rapid increase of the central electron temperature (Te(0 before the plasma becomes overdense. The increased Te(0 will significantly reduce the Ip decay rate of CHI plasmas, allowing the coupling of fast wave heating and neutral beam injection. A megawatt-level, 28 GHz electron heating system is planned for heating NI start-up plasmas in NSTX-U. In addition to EC heating of CHI start-up discharges, this system will be used for electron Bernstein wave (EBW plasma start-up, and eventually for EBW heating and current drive during the Ip flattop.

  11. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  12. MAPS development for the ALICE ITS upgrade

    Science.gov (United States)

    Yang, P.; Aglieri, G.; Cavicchioli, C.; Chalmet, P. L.; Chanlek, N.; Collu, A.; Gao, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Kim, D.; Kim, J.; Lattuca, A.; Marin Tobon, C. A.; Marras, D.; Mager, M.; Martinengo, P.; Mazza, G.; Mugnier, H.; Musa, L.; Puggioni, C.; Rousset, J.; Reidt, F.; Riedler, P.; Snoeys, W.; Siddhanta, S.; Usai, G.; van Hoorne, J. W.; Yi, J.

    2015-03-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips.

  13. Biogas Upgrading and Waste-to-Energy | Bioenergy | NREL

    Science.gov (United States)

    Biogas Upgrading and Waste-to-Energy Biogas Upgrading and Waste-to-Energy NREL's waste-to-energy research and development required for upgrading biogas to fuels and high-value co-products. Featured (2014) Biogas Potential in the United States, NREL Fact Sheet (2013) View all NREL biogas upgrading and

  14. Upgrade of the ATLAS Silicon Tracker for the sLHC

    CERN Document Server

    Minano, M; The ATLAS collaboration

    2009-01-01

    While the CERN Large Hadron Collider (LHC) will start taking data this year, scenarios for a machine upgrade to achieve a much higher luminosity are being developed. In the current planning, it is foreseen to increase the luminosity of the LHC at CERN around 2016 by about an order of magnitude, with the upgraded muchine dubbed Super-LHC or SLHC. As radiation damage scales with integrated luminosity, the particle physics experiments at the SLHC will need to be equipped with a new generation of radiation-hard detectors. This is of particular importance for the semiconductor tracking detectors located close to the LHC interaction region, where the higest radiation doses occur. The ATLAS experiment will require a new particle tracking system for SLHC operation. In order to cope with the increase in background events by about one order of magnitude at the higher luminosity, an all silicon detector with enhanced radiation hardness is being designed. The new silicon strip detector will use significantly shorter stri...

  15. Studies on irradiated pixel detectors for the ATLAS IBL and HL-LHC upgrade

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00371978; Gößling, Claus; Pernegger, Heinz

    The constant demand for higher luminosity in high energy physics is the reason for the continuous effort to adapt the accelerators and the experiments. The upgrade program for the experiments and the accelerators at CERN already includes several expansion stages of the Large Hadron Collider (LHC) which will increase the luminosity and the energy of the accelerator. Simultaneously the LHC experiments prepare the individual sub-detectors for the increasing demands in the coming years. Especially the tracking detectors have to cope with fluence levels unprecedented for high energy physics experiments. Correspondingly to the fluence increases the impact of the radiation damage which reduces the life time of the detectors by decreasing the detector performance and efficiency. To cope with this effect new and more radiation hard detector concepts become necessary to extend the life time. This work concentrates on the impact of radiation damage on the pixel sensor technologies to be used in the next upgrade of the ...

  16. Elliptical superconducting RF cavities for FRIB energy upgrade

    Science.gov (United States)

    Ostroumov, P. N.; Contreras, C.; Plastun, A. S.; Rathke, J.; Schultheiss, T.; Taylor, A.; Wei, J.; Xu, M.; Xu, T.; Zhao, Q.; Gonin, I. V.; Khabiboulline, T.; Pischalnikov, Y.; Yakovlev, V. P.

    2018-04-01

    The multi-physics design of a five cell, βG = 0 . 61, 644 MHz superconducting elliptical cavity being developed for an energy upgrade in the Facility for Rare Isotope Beams (FRIB) is presented. The FRIB energy upgrade from 200 MeV/u to 400 MeV/u for heaviest uranium ions will increase the intensities of rare isotope beams by nearly an order of magnitude. After studying three different frequencies, 1288 MHz, 805 MHz, and 644 MHz, the 644 MHz cavity was shown to provide the highest energy gain per cavity for both uranium and protons. The FRIB upgrade will include 11 cryomodules containing 5 cavities each and installed in 80-meter available space in the tunnel. The cavity development included extensive multi-physics optimization, mechanical and engineering analysis. The development of a niobium cavity is complete and two cavities are being fabricated in industry. The detailed design of the cavity sub-systems such as fundamental power coupler and dynamic tuner are currently being pursued. In the overall design of the cavity and its sub-systems we extensively applied experience gained during the development of 650 MHz low-beta cavities at Fermi National Accelerator Laboratory (FNAL) for the Proton Improvement Plan (PIP) II.

  17. THE MEGAMASER COSMOLOGY PROJECT. V. AN ANGULAR-DIAMETER DISTANCE TO NGC 6264 AT 140 Mpc

    International Nuclear Information System (INIS)

    Kuo, C. Y.; Braatz, J. A.; Lo, K. Y.; Condon, J. J.; Impellizzeri, C. M. V.; Reid, M. J.; Henkel, C.

    2013-01-01

    We present the direct measurement of the Hubble constant, yielding the direct measurement of the angular-diameter distance to NGC 6264 using the H 2 O megamaser technique. Our measurement is based on sensitive observations of the circumnuclear megamaser disk from four observations with the Very Long Baseline Array, the Green Bank Telescope (GBT), and the Effelsberg telescope. We also monitored the maser spectral profile for 2.3 years using the GBT to measure accelerations of maser lines by tracking their line-of-sight velocities as they change with time. The measured accelerations suggest that the systemic maser spots have a significantly wider radial distribution than in the archetypal megamaser in NGC 4258. We model the maser emission as arising from a circumnuclear disk with orbits dominated by the central black hole. The best fit of the data gives a Hubble constant of H 0 = 68 ± 9 km s –1 Mpc –1 , which corresponds to an angular-diameter distance of 144 ± 19 Mpc. In addition, the fit also gives a mass of the central black hole of (3.09 ± 0.42) × 10 7 M ☉ . The result demonstrates the feasibility of measuring distances to galaxies located well into the Hubble flow by using circumnuclear megamaser disks.

  18. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  19. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  20. Beam test results for the upgraded LHCb RICH opto-electronic readout system

    CERN Multimedia

    Carniti, Paolo

    2016-01-01

    The LHCb experiment is devoted to high-precision measurements of CP violation and search for New Physics by studying the decays of beauty and charmed hadrons produced at the Large Hadron Collider (LHC). Two RICH detectors are currently installed and operating successfully, providing a crucial role in the particle identification system of the LHCb experiment. Starting from 2019, the LHCb experiment will be upgraded to operate at higher luminosity, extending its potential for discovery and study of new phenomena. Both the RICH detectors will be upgraded and the entire opto-electronic system has been redesigned in order to cope with the new specifications, namely higher readout rates, and increased occupancies. The new photodetectors, readout electronics, mechanical assembly and cooling system have reached the final phase of development and their performance was thoroughly and successfully validated during several beam test sessions in 2014 and 2015 at the SPS facility at CERN. Details of the test setup and perf...

  1. A neural network based implementation of an MPC algorithm applied in the control systems of electromechanical plants

    Science.gov (United States)

    Marusak, Piotr M.; Kuntanapreeda, Suwat

    2018-01-01

    The paper considers application of a neural network based implementation of a model predictive control (MPC) control algorithm to electromechanical plants. Properties of such control plants implicate that a relatively short sampling time should be used. However, in such a case, finding the control value numerically may be too time-consuming. Therefore, the current paper tests the solution based on transforming the MPC optimization problem into a set of differential equations whose solution is the same as that of the original optimization problem. This set of differential equations can be interpreted as a dynamic neural network. In such an approach, the constraints can be introduced into the optimization problem with relative ease. Moreover, the solution of the optimization problem can be obtained faster than when the standard numerical quadratic programming routine is used. However, a very careful tuning of the algorithm is needed to achieve this. A DC motor and an electrohydraulic actuator are taken as illustrative examples. The feasibility and effectiveness of the proposed approach are demonstrated through numerical simulations.

  2. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  3. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Lili; Huang, Liansheng, E-mail: huangls@ipp.ac.cn; Fu, Peng; Gao, Ge; He, Shiying

    2016-11-15

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  4. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    International Nuclear Information System (INIS)

    Zhu, Lili; Huang, Liansheng; Fu, Peng; Gao, Ge; He, Shiying

    2016-01-01

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  5. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  6. Hydrogen alternatives for a regional upgrader

    International Nuclear Information System (INIS)

    Bailey, R.T.; Padamsey, R.

    1991-01-01

    For a proposed regional upgrader in Alberta, hydrogen will be needed to upgrade the bitumen and heavy oil to be processed by that facility. The upgrader will rely on high conversion hydrocracking which consumes 3.4 wt % hydrogen to produce a 106% volume yield of high quality synthetic crude. The costs of producing hydrogen via steam reforming of methane, partial oxidation of coal or upgrading residues, and electrolysis are compared, showing that steam reforming is the cheapest. However, an even cheaper source of hydrogen is available in the Edmonton and Fort Saskatchewan area as byproducts from petrochemical plants. An economic analysis is presented of a proposed scheme to capture, purify, compress, and transfer hydrogen from one or two such plants to a nearby regional upgrader. The two plants could supply a total of 126.6 million ft 3 /d of hydrogen at a total installed capital cost of about half of that of a steam reforming plant of equivalent size. When operating costs are added (including the cost of replacing the hydrogen, currently used as fuel at the two plants, with natural gas), the total cost of hydrogen is substantially less than the costs for a hydrogen plant within the upgrader. 3 refs., 5 figs., 4 tabs

  7. Test of Gb Ethernet with FPGA for HADES upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Gilardi, C. [II. Physikalisches Inst., Giessen Univ. (Germany)

    2007-07-01

    Within the HADES experiment, we are investigating a trigger upgrade in order to run heavier systems (Au + Au). We investigate Gigabit Ethernet transfers with Xilinx Virtex II FPGA on the commercial board Celoxica RC300E. We implement the transfer protocols (UDP, ICMP, ARP) with Handel-C. First results of bandwidth and latency will be presented. (orig.)

  8. Technical Proposal for the Phase-II Upgrade of the CMS Detector

    CERN Document Server

    CMS Collaboration; Contardo, D; Klute, M; Mans, J; Silvestris, L; Butler, J; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    This Technical Proposal presents the upgrades foreseen to prepare the CMS experiment for the High Luminosity LHC. In this second phase of the LHC physics program, the accelerator will provide to CMS an additional integrated luminosity of about 2500 fb-1 over 10 years of operation, starting in 2025. This will substantially enlarge the mass reach in the search for new particles and will also greatly extend the potential to study the properties of the Higgs boson discovered at the LHC in 2012. In order to meet the experimental challenges of unprecedented p-p luminosity, the CMS collaboration will need to address the aging of the present detector and to improve the ability of the apparatus to isolate and precisely measure the products of the most interesting collisions. This document describes the conceptual designs and the expected performance of the upgrades, along with the plans to develop the appropriate experimental techniques. The infrastructure upgrades and the logistics of the installation in the experim...

  9. Determination of the stochastic layer properties induced by magnetic perturbations via heat pulse experiments at ASDEX upgrade

    Directory of Open Access Journals (Sweden)

    D. Brida

    2017-08-01

    Full Text Available A heat pulse experiment was carried out in the tokamak ASDEX Upgrade to estimate the stochastic layer width of a deuterium L-mode discharge with externally applied Magnetic Perturbations. The method relies on the deposition of ECRH pulses in the plasma edge while measuring the divertor target heat flux with high temporal resolution IR thermography and Langmuir probes. The experimental results were compared to simulations of the time dependent heat pulse propagation on a constant plasma background with the EMC3-EIRENE code package, using an ad-hoc screening model. If no screening was taken into account in the simulations a decrease in the characteristic heat pulse propagation time was observed, which shows that the heat transport is enhanced compared to the screened cases. No such enhancement was found in the experiment, indicating strong screening. In further simulations the effect of screening on the target fluxes was investigated for varying densities. For low densities it was found that screening reduces the strike line splitting strongly, while for higher densities no strong strike line splitting was found, independent of the screening degree. For strongly detached L-mode conditions with MPs experiments at AUG indicate that the lobe structures vanish completely.

  10. Performance measurement of the upgraded D0 central track trigger

    International Nuclear Information System (INIS)

    Mommsen, Remigius K.; Manchester U.

    2006-01-01

    The D0 experiment was upgraded in spring 2006 to harvest the full physics potential of the Tevatron accelerator at Fermi National Accelerator Laboratory, Batavia, Illinois, USA. It is expected that the peak luminosity delivered by the accelerator will increase to over 300 x 10 30 cm -2 s -1 . One of the upgraded systems is the Central Track Trigger (CTT). The CTT uses the Central Fiber Tracker (CFT) and Preshower detectors to identify central tracks with p T > 1.5GeV at the first trigger level. Track candidates are formed by comparing fiber hits to predefined track equations. In order to minimize latency, this operation is performed in parallel using combinatorial logic implemented in FPGAs. Limited hardware resources prevented the use of the full granularity of the CFT. This leads to a high fake track rate as the occupancy increases. In order to mitigate the problem, new track-finding hardware was designed and commissioned. We report on the upgrade and the improved performance of the CTT system

  11. Expression of Interest for a Phase-II LHCb Upgrade: Opportunities in flavour physics, and beyond, in the HL-LHC era

    CERN Document Server

    Aaij, Roel; Adinolfi, Marco; Ajaltouni, Ziad; Akar, Simon; Albrecht, Johannes; Alessio, Federico; Alexander, Michael; Ali, Suvayu; Alkhazov, Georgy; Alvarez Cartelle, Paula; Alves Jr, Antonio Augusto; Amato, Sandra; Amerio, Silvia; Amhis, Yasmine; An, Liupan; Anderlini, Lucio; Andreassi, Guido; Andreotti, Mirco; Andrews, Jason; Anelli, Mario; Appleby, Robert; Archilli, Flavio; d'Argent, Philippe; Arnau Romeu, Joan; Artamonov, Alexander; Artuso, Marina; Aslanides, Elie; Auriemma, Giulio; Baalouch, Marouen; Babuschkin, Igor; Bachmann, Sebastian; Back, John; Badalov, Alexey; Baesso, Clarissa; Baker, Sophie; Balagura, Vladislav; Baldini, Wander; Balla, Alessandro; Baranov, Alexander; Barlow, Roger; Barschel, Colin; Barsuk, Sergey; Barter, William; Baryshnikov, Fedor; Baszczyk, Mateusz; Batozskaya, Varvara; Batsukh, Baasansuren; Battista, Vincenzo; Bay, Aurelio; Beaucourt, Leo; Beddow, John; Bedeschi, Franco; Bediaga, Ignacio; Beiter, Andrew; Bel, Lennaert; Bellee, Violaine; Belloli, Nicoletta; Belous, Konstantin; Belyaev, Ivan; Ben-Haim, Eli; Bencivenni, Giovanni; Benson, Sean; Beranek, Sarah; Berezhnoy, Alexander; Bernet, Roland; Bertolin, Alessandro; Betancourt, Christopher; Betti, Federico; Bettler, Marc-Olivier; van Beuzekom, Martinus; Bezshyiko, Iaroslava; Bifani, Simone; Billoir, Pierre; Birnkraut, Alex; Bitadze, Alexander; Bizzeti, Andrea; Blake, Thomas; Blanc, Frederic; Blouw, Johan; Blusk, Steven; Bocci, Valerio; Boettcher, Thomas; Bondar, Alexander; Bondar, Nikolay; Bonivento, Walter; Bordyuzhin, Igor; Borgheresi, Alessio; Borghi, Silvia; Borisyak, Maxim; Borsato, Martino; Bossu, Francesco; Boubdir, Meriem; Bowcock, Themistocles; Bowen, Espen Eie; Bozzi, Concezio; Braun, Svende; Britton, Thomas; Brodzicka, Jolanta; Brundu, Davide; Buchanan, Emma; Burr, Christopher; Bursche, Albert; Buytaert, Jan; Cadeddu, Sandro; Calabrese, Roberto; Calvi, Marta; Calvo Gomez, Miriam; Camboni, Alessandro; Campana, Pierluigi; Campora Perez, Daniel Hugo; Capriotti, Lorenzo; Carbone, Angelo; Carboni, Giovanni; Cardinale, Roberta; Cardini, Alessandro; Carletti, Maurizio; Carniti, Paolo; Carson, Laurence; Carvalho Akiba, Kazuyoshi; Casse, Gianluigi; Cassina, Lorenzo; Castillo Garcia, Lucia; Casu, Luigi; Cattaneo, Marco; Cavallero, Giovanni; Cenci, Riccardo; Chamont, David; Charles, Matthew; Charpentier, Philippe; Chatzikonstantinidis, Georgios; Chefdeville, Maximilien; Chen, Shanzhen; Cheung, Shu-Faye; Chobanova, Veronika; Chrzaszcz, Marcin; Chubykin, Alexsei; Ciambrone, Paolo; Cid Vidal, Xabier; Ciezarek, Gregory; Citterio, Mauro; Clarke, Peter; Clemencic, Marco; Cliff, Harry; Closier, Joel; Coco, Victor; Coelli, Simone; Cogan, Julien; Cogneras, Eric; Cogoni, Violetta; Cojocariu, Lucian; Collins, Paula; Comerma-Montells, Albert; Contu, Andrea; Cook, Andrew; Coombs, George; Coquereau, Samuel; Corti, Gloria; Corvo, Marco; Costa Sobral, Cayo Mar; Couturier, Benjamin; Cowan, Greig; Craik, Daniel Charles; Crocombe, Andrew; Cruz Torres, Melissa Maria; Cunliffe, Samuel; Currie, Robert; D'Ambrosio, Carmelo; Da Cunha Marinho, Franciole; Dall'Occo, Elena; Dalseno, Jeremy; David, Pieter; Davis, Adam; De Bruyn, Kristof; De Capua, Stefano; De Cian, Michel; De Miranda, Jussara; De Paula, Leandro; De Serio, Marilisa; De Simone, Patrizia; Dean, Cameron Thomas; Decamp, Daniel; Deckenhoff, Mirko; Del Buono, Luigi; Demmer, Moritz; Dendek, Adam; Derkach, Denis; Deschamps, Olivier; Dettori, Francesco; Dey, Biplab; Di Canto, Angelo; Di Nezza, Pasquale; Dijkstra, Hans; Dordei, Francesca; Dorigo, Mirco; Dosil Su{á}rez, Alvaro; Dovbnya, Anatoliy; Dreimanis, Karlis; Dufour, Laurent; Dujany, Giulio; Dungs, Kevin; Durante, Paolo; Dzhelyadin, Rustem; Dziurda, Agnieszka; Dzyuba, Alexey; D{é}l{é}age, Nicolas; Easo, Sajan; Ebert, Marcus; Egede, Ulrik; Egorychev, Victor; Eidelman, Semen; Eisenhardt, Stephan; Eitschberger, Ulrich; Ekelhof, Robert; Eklund, Lars; Ely, Scott; Esen, Sevda; Evans, Hannah Mary; Evans, Timothy; Falabella, Antonio; Farley, Nathanael; Farry, Stephen; Fay, Robert; Fazzini, Davide; Felici, Giulietto; Ferguson, Dianne; Fernandez, Gerard; Fernandez Prieto, Antonio; Ferrari, Fabio; Ferreira Rodrigues, Fernando; Ferro-Luzzi, Massimiliano; Filippov, Sergey; Fini, Rosa Anna; Fiore, Marco; Fiorini, Massimiliano; Firlej, Miroslaw; Fitzpatrick, Conor; Fiutowski, Tomasz; Fleuret, Frederic; Fohl, Klaus; Fontana, Marianna; Fontanelli, Flavio; Forshaw, Dean Charles; Forty, Roger; Franco Lima, Vinicius; Frank, Markus; Frei, Christoph; Fresch, Paolo; Fu, Jinlin; Funk, Wolfgang; Furfaro, Emiliano; F{ä}rber, Christian; Gallas Torreira, Abraham; Galli, Domenico; Gallorini, Stefano; Gambetta, Silvia; Gandelman, Miriam; Gandini, Paolo; Gao, Yuanning; Garcia Martin, Luis Miguel; Garc{í}a Pardi{ñ}as, Juli{á}n; Garra Tico, Jordi; Garrido, Lluis; Garsed, Philip John; Gascon, David; Gaspar, Clara; Gatta, Maurizio; Gavardi, Laura; Gazzoni, Giulio; Gerick, David; Gersabeck, Evelina; Gersabeck, Marco; Gershon, Timothy; Ghez, Philippe; Gian{ì}, Sebastiana; Gibson, Valerie; Girard, Olivier G{ö}ran; Giubega, Lavinia-Helena; Gizdov, Konstantin; Gligorov, Vladimir; Golubkov, Dmitry; Golutvin, Andrey; Gomes, Alvaro; Gorelov, Igor Vladimirovich; Gotti, Claudio; Govorkova, Ekaterina; Graciani Diaz, Ricardo; Granado Cardoso, Luis Alberto; Graug{é}s, Eugeni; Graverini, Elena; Graziani, Giacomo; Grecu, Alexandru; Greim, Roman; Griffith, Peter; Grillo, Lucia; Gruberg Cazon, Barak Raimond; Gr{ü}nberg, Oliver; Gushchin, Evgeny; Guz, Yury; Gys, Thierry; G{ö}bel, Carla; Hadavizadeh, Thomas; Hadjivasiliou, Christos; Haefeli, Guido; Haen, Christophe; Haines, Susan; Hamilton, Brian; Han, Xiaoxue; Hansmann-Menzemer, Stephanie; Harnew, Neville; Harnew, Samuel; Harrison, Jonathan; Hatch, Mark; He, Jibo; Head, Timothy; Heister, Arno; Hennessy, Karol; Henrard, Pierre; Henry, Louis; van Herwijnen, Eric; Heß, Miriam; Hicheur, Adl{è}ne; Hill, Donal; Hombach, Christoph; Hopchev, P H; Huard, Zachary; Hulsbergen, Wouter; Humair, Thibaud; Hushchyn, Mikhail; Hutchcroft, David; Idzik, Marek; Ilten, Philip; Jacobsson, Richard; Jalocha, Pawel; Jans, Eddy; Jawahery, Abolhassan; Jiang, Feng; John, Malcolm; Johnson, Daniel; Jones, Christopher; Joram, Christian; Jost, Beat; Jurik, Nathan; Kandybei, Sergii; Karacson, Matthias; Kariuki, James Mwangi; Karodia, Sarah; Kecke, Matthieu; Kelsey, Matthew; Kenzie, Matthew; Ketel, Tjeerd; Khairullin, Egor; Khanji, Basem; Khurewathanakul, Chitsanu; Kirn, Thomas; Klaver, Suzanne; Klimaszewski, Konrad; Klimkovich, Tatsiana; Koliiev, Serhii; Kolpin, Michael; Komarov, Ilya; Koppenburg, Patrick; Kosmyntseva, Alena; Kotriakhova, Sofia; Kozachuk, Anastasiia; Kozeiha, Mohamad; Kravchuk, Leonid; Kreplin, Katharina; Kreps, Michal; Krokovny, Pavel; Kruse, Florian; Krzemien, Wojciech; Kucewicz, Wojciech; Kucharczyk, Marcin; Kudryavtsev, Vasily; Kuonen, Axel Kevin; Kurek, Krzysztof; Kvaratskheliya, Tengiz; Lacarrere, Daniel; Lafferty, George; Lai, Adriano; Langenbruch, Christoph; Latham, Thomas; Lazzeroni, Cristina; Le Gac, Renaud; van Leerdam, Jeroen; Leflat, Alexander; Lefran{ç}ois, Jacques; Lef{è}vre, Regis; Lemaitre, Florian; Lemos Cid, Edgar; Leroy, Olivier; Lesiak, Tadeusz; Leverington, Blake; Li, Tenglin; Li, Yiming; Li, Zhuoming; Likhomanenko, Tatiana; Lindner, Rolf; Lionetto, Federica; Liu, Xuesong; Loh, David; Loi, Angelo; Longstaff, Iain; Lopes, Jose; Lucchesi, Donatella; Lucio Martinez, Miriam; Luo, Haofei; Lupato, Anna; Luppi, Eleonora; Lupton, Oliver; Lusiani, Alberto; Lyu, Xiao-Rui; Machefert, Frederic; Maciuc, Florin; Maev, Oleg; Maguire, Kevin; Malde, Sneha; Malinin, Alexander; Maltsev, Timofei; Manca, Giulia; Mancinelli, Giampiero; Manning, Peter Michael; Maratas, Jan; Marchand, Jean Fran{ç}ois; Marconi, Umberto; Marin Benito, Carla; Marinangeli, Matthieu; Marino, Pietro; Marks, J{ö}rg; Marras, Davide; Martellotti, Giuseppe; Martin, Morgan; Martinelli, Maurizio; Martinez Santos, Diego; Martinez Vidal, Fernando; Martins Tostes, Danielle; Massacrier, Laure Marie; Massafferri, Andr{é}; Matev, Rosen; Mathad, Abhijit; Mathe, Zoltan; Matteuzzi, Clara; Mauri, Andrea; Maurice, Emilie; Maurin, Brice; Mazurov, Alexander; McCann, Michael; McNab, Andrew; McNulty, Ronan; Meadows, Brian; Meier, Frank; Melnychuk, Dmytro; Merk, Marcel; Merli, Andrea; Michielin, Emanuele; Milanes, Diego Alejandro; Minard, Marie-Noelle; Mitzel, Dominik Stefan; Mogini, Andrea; Molina Rodriguez, Josue; Monroy, Igancio Alberto; Monteil, Stephane; Morandin, Mauro; Morawski, Piotr; Morello, Michael Joseph; Morgunova, Olga; Moron, Jakub; Morris, Adam Benjamin; Mountain, Raymond; Muheim, Franz; Mulder, Mick; Mussini, Manuel; M{ü}ller, Dominik; M{ü}ller, Janine; M{ü}ller, Katharina; M{ü}ller, Vanessa; Naik, Paras; Nakada, Tatsuya; Nandakumar, Raja; Nandi, Anita; Nasteva, Irina; Needham, Matthew; Neri, Nicola; Neubert, Sebastian; Neufeld, Niko; Neuner, Max; Nguyen, Thi Dung; Nguyen-Mau, Chung; Nieswand, Simon; Niet, Ramon; Nikitin, Nikolay; Nikodem, Thomas; Nogay, Alla; Novoselov, Alexey; O'Hanlon, Daniel Patrick; Oblakowska-Mucha, Agnieszka; Obraztsov, Vladimir; Ogilvy, Stephen; Oldeman, Rudolf; Onderwater, Gerco; Otalora Goicochea, Juan Martin; Otto, Adam; Owen, Patrick; Oyanguren, Maria Aranzazu; Pais, Preema Rennee; Palano, Antimo; Palutan, Matteo; Papanestis, Antonios; Pappagallo, Marco; Pappalardo, Luciano; Pappenheimer, Cheryl; Parker, William; Parkes, Christopher; Passaleva, Giovanni; Pastore, Alessandra; Patel, Mitesh; Patrignani, Claudia; Pearce, Alex; Pellegrino, Antonio; Penso, Gianni; Pepe Altarelli, Monica; Perazzini, Stefano; Perret, Pascal; Pescatore, Luca; Petridis, Konstantinos; Petrolini, Alessandro; Petrov, Aleksandr; Petruzzo, Marco; Picatoste Olloqui, Eduardo; Pietrzyk, Boleslaw; Pikies, Malgorzata; Pinci, Davide; Pistone, Alessandro; Piucci, Alessio; Placinta, Vlad-Mihai; Playfer, Stephen; Plo Casasus, Maximo; Poikela, Tuomas; Polci, Francesco; Poli Lener, Marco; Poluektov, Anton; Polyakov, Ivan; Polycarpo, Erica; Pomery, Gabriela Johanna; Ponce, Sebastien; Popov, Alexander; Popov, Dmitry; Popovici, Bogdan; Poslavskii, Stanislav; Potterat, C{é}dric; Price, Eugenia; Prisciandaro, Jessica; Prouve, Claire; Pugatch, Valery; Puig Navarro, Albert; Punzi, Giovanni; Qian, Chen; Qian, Wenbin; Quagliani, Renato; Rachwal, Bartolomiej; Rademacker, Jonas; Rama, Matteo; Ramos Pernas, Miguel; Rangel, Murilo; Raniuk, Iurii; Ratnikov, Fedor; Raven, Gerhard; Redi, Federico; Reichert, Stefanie; dos Reis, Alberto; Remon Alepuz, Clara; Renaudin, Victor; Ricciardi, Stefania; Richards, Sophie; Rihl, Mariana; Rinnert, Kurt; Rives Molina, Vicente; Robbe, Patrick; Rodrigues, Ana Barbara; Rodrigues, Eduardo; Rodriguez Lopez, Jairo Alexis; Rodriguez Perez, Pablo; Rogozhnikov, Alexey; Roiser, Stefan; Rollings, Alexandra Paige; Romanovskiy, Vladimir; Romero Vidal, Antonio; Ronayne, John William; Rotondo, Marcello; Rudolph, Matthew Scott; Ruf, Thomas; Ruiz Valls, Pablo; Saborido Silva, Juan Jose; Sadykhov, Elnur; Sagidova, Naylya; Saitta, Biagio; Salustino Guimaraes, Valdir; Sanchez Gonzalo, David; Sanchez Mayordomo, Carlos; Sanmartin Sedes, Brais; Santacesaria, Roberta; Santamarina Rios, Cibran; Santimaria, Marco; Santovetti, Emanuele; Saputi, Alessandro; Sarti, Alessio; Satriano, Celestina; Satta, Alessia; Saunders, Daniel Martin; Savrina, Darya; Schael, Stefan; Schellenberg, Margarete; Schiller, Manuel; Schindler, Heinrich; Schlupp, Maximilian; Schmelling, Michael; Schmelzer, Timon; Schmidt, Burkhard; Schneider, Olivier; Schopper, Andreas; Schreiner, HF; Schubert, Konstantin; Schubiger, Maxime; Schune, Marie Helene; Schwemmer, Rainer; Sciascia, Barbara; Sciubba, Adalberto; Semennikov, Alexander; Sergi, Antonino; Serra, Nicola; Serrano, Justine; Sestini, Lorenzo; Seyfert, Paul; Shapkin, Mikhail; Shapoval, Illya; Shcheglov, Yury; Shears, Tara; Shekhtman, Lev; Shevchenko, Vladimir; Siddi, Benedetto Gianluca; Silva Coutinho, Rafael; Silva de Oliveira, Luiz Gustavo; Simi, Gabriele; Simone, Saverio; Sirendi, Marek; Skidmore, Nicola; Skwarnicki, Tomasz; Smith, Eluned; Smith, Iwan Thomas; Smith, Jackson; Smith, Mark; Soares Lavra, Lais; Sokoloff, Michael; Soler, Paul; Souza De Paula, Bruno; Spaan, Bernhard; Spradlin, Patrick; Sridharan, Srikanth; Stagni, Federico; Stahl, Marian; Stahl, Sascha; Stefko, Pavol; Stefkova, Slavomira; Steinkamp, Olaf; Stemmle, Simon; Stenyakin, Oleg; Stevens, Holger; Stoica, Sabin; Stone, Sheldon; Storaci, Barbara; Stracka, Simone; Stramaglia, Maria Elena; Straticiuc, Mihai; Straumann, Ulrich; Sun, Liang; Sutcliffe, William; Swientek, Krzysztof; Syropoulos, Vasileios; Szczekowski, Marek; Szumlak, Tomasz; T'Jampens, Stephane; Tayduganov, Andrey; Tekampe, Tobias; Tellarini, Giulia; Teubert, Frederic; Thomas, Eric; van Tilburg, Jeroen; Tilley, Matthew James; Tisserand, Vincent; Tobin, Mark; Tolk, Siim; Tomassetti, Luca; Tonelli, Diego; Topp-Joergensen, Stig; Toriello, Francis; Tourinho Jadallah Aoude, Rafael; Tournefier, Edwige; Tourneur, Stephane; Trabelsi, Karim; Traill, Murdo; Tran, Minh T{â}m; Tresch, Marco; Trisovic, Ana; Tsaregorodtsev, Andrei; Tsopelas, Panagiotis; Tully, Alison; Tuning, Niels; Ukleja, Artur; Ustyuzhanin, Andrey; Uwer, Ulrich; Vacca, Claudia; Vagnoni, Vincenzo; Valassi, Andrea; Valat, Sebastien; Valenti, Giovanni; Van Dijk, Maarten; Vazquez Gomez, Ricardo; Vazquez Regueiro, Pablo; Vecchi, Stefania; van Veghel, Maarten; Velthuis, Jaap; Veltri, Michele; Veneziano, Giovanni; Venkateswaran, Aravindhan; Verlage, Tobias Anton; Vernet, Maxime; Vesterinen, Mika; Viana Barbosa, Joao Vitor; Viaud, Benoit; Vieira, Daniel; Vieites Diaz, Maria; Viemann, Harald; Vilasis-Cardona, Xavier; Vitti, Marcela; Volkov, Vladimir; Vollhardt, Achim; Voneki, Balazs; Vorobyev, Alexey; Vorobyev, Vitaly; Voß, Christian; de Vries, Jacco; V{á}zquez Sierra, Carlos; Waldi, Roland; Wallace, Charlotte; Wallace, Ronan; Walsh, John; Wang, Jianchun; Ward, David; Wark, Heather Mckenzie; Watson, Nigel; Websdale, David; Weiden, Andreas; Whitehead, Mark; Wicht, Jean; Wilkinson, Guy; Wilkinson, Michael; Williams, Mark Richard James; Williams, Matthew; Williams, Mike; Williams, Timothy; Wilson, Fergus; Wimberley, Jack; Winn, Michael Andreas; Wishahi, Julian; Wislicki, Wojciech; Witek, Mariusz; Wormser, Guy; Wotton, Stephen; Wraight, Kenneth; Wyllie, Kenneth; Xie, Yuehong; Xing, Zhou; Xu, Zhirui; Yang, Zhenwei; Yang, Zishuo; Yao, Yuezhe; Yin, Hang; Yu, Jiesheng; Yuan, Xuhao; Yushchenko, Oleg; Zarebski, Kristian Alexander; Zavertyaev, Mikhail; Zhang, Liming; Zhang, Yanxi; Zhelezov, Alexey; Zheng, Yangheng; Zhu, Xianglei; Zhukov, Valery; Zucchelli, Stefano; CERN. Geneva. The LHC experiments Committee; LHCC

    2017-01-01

    A Phase-II Upgrade is proposed for the LHCb experiment in order to take full advantage of the flavour-physics opportunities at the HL-LHC, and other topics that can be studied with a forward spectrometer. This Upgrade, which will be installed in Long Shutdown 4 of the LHC (2030), will build on the strengths of the current experiment and the Phase-I Upgrade, but will consist of re-designed sub-systems that can operate at a luminosity of $2 \\times 10^{34}\\,{\\rm cm}^{-2} s^{-1}$, ten times that of the Phase-I Upgrade detector. New and improved detector components will increase the intrinsic performance of the experiment in certain key areas. In particular the installation of a tungsten sampling electromagnetic calorimeter will widen LHCb's capabilities for decays involving $\\pi^0$ and $\\eta$ mesons, electrons, and photons from loop-level penguin processes. The physics motivation is presented, and the prospects for operating the LHCb Interaction Point at high luminosity are assessed. The challenges for the detect...

  12. arXiv Architecture of the LHCb muon Frontend control system upgrade

    CERN Document Server

    Bocci, Valerio

    2016-10-06

    The LHCb experiment(Fig. 1), that is presently taking data at CERN (European Center for Nuclear Research) Large Hadron Collider (LHC), aims at the study of CP violation in the B meson sector. Its key elements is the Muon detector [1], which allows triggering, and muon identification from inclusive b decays. The electronic system (Fig. 2) of the whole detector is very complex and its Muon detector Experiment Control System (ECS) allows monitoring and control of a number of Front-End boards in excess of 7000. The present system in charge of controlling Muon detector Front-End (FE) Electronics consists of 10 Crates of equipment; each crate contains two kinds of modules: a Pulse Distribution Module (PDM) and up to 20 Service Boards (SB) connected via a custom Backplane for a total amount of about 800 microcontrollers[2]. LHCb upgrade is planned for 2018/19, which will allow the detector to exploit higher luminosity running. This upgrade will allow the experiment to accumulate more luminosity to allow measurements...

  13. Update on the ASDEX Upgrade data acquisition and data management environment

    Energy Technology Data Exchange (ETDEWEB)

    Behler, K., E-mail: karl.behler@ipp.mpg.de; Blank, H.; Buhler, A.; Drube, R.; Eixenberger, H.; Engelhardt, K.; Lohs, A.; Merkel, R.; Raupp, G.; Treutterer, W.

    2014-05-15

    Highlights: • An exponential growth of data amount was managed over more than twenty years of experiment operation. • Continuous adaptation of the diagnostic software and configuration keeps track with actual experiment demands. • A great number of distributed, varying diagnostics is centrally managed. - Abstract: It has been a while since it had been reported on the status of ASDEX Upgrade data acquisition (DAQ) and data management environment. An update on changes, expansions, and enhancements applied in the last years will be given. The acquired amount of data per shot increased from 4 GiB to 40 GiB in eight years. Network, storage, and archive challenges have been managed by stepwise improvements. New DAQ techniques have been introduced to replace outdated technologies. Real-time diagnostics speed-up data provisioning and contribute to feedback control. Information technology applied to ASDEX Upgrade is under permanent change. Recent and future steps are outlined.

  14. A 120 mm Bore Quadrupole for the Phase 1 LHC Upgrade

    CERN Document Server

    Fessia, P; Borgnolutti, F; Regis, F; Richter, D; Todesco, E

    2010-01-01

    The phase I LHC upgrade foresees the installation of a new final focusing for the high luminosity experiences in order to be able to focus the beams in the interaction points to b*~ 0.25 cm. Key element of this upgrade is a large bore (120 mm) superconducting quadrupole. This article proposes a magnet design that will make use of the LHC main dipole superconducting cable. Due to the schedule constraints and to the budget restrictions, it is mandatory to integrate in the design the maximum number of features successfully used during the LHC construction. This paper presents this design option and the rationales behind the several technical choices.

  15. Marine Corps Amphibious Combat Vehicle (ACV) and Marine Personnel Carrier (MPC): Background and Issues for Congress

    Science.gov (United States)

    2016-09-09

    providing critical capabilities to execute the nation’s military strategy . On January 6, 2011, after spending approximately $3 billion in...the Landing Craft , Air Cushioned (LCAC). The LAV-25 has been in service since 1983. According to the Marine Program Executive Office (PEO) Land...the Marines’ new MPC/ACV acquisition strategy and its associated challenges and risks. Marine Corps Amphibious Combat Vehicle (ACV) and Marine

  16. Novel silicon n-on-p edgeless planar pixel sensors for the ATLAS upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Bomben, M., E-mail: marco.bomben@cern.ch [Laboratoire de Physique Nucleaire et de Hautes Énergies (LPNHE), Paris (France); Bagolini, A.; Boscardin, M. [Fondazione Bruno Kessler, Centro per i Materiali e i Microsistemi (FBK-CMM) Povo di Trento (Italy); Bosisio, L. [Università di Trieste, Dipartimento di Fisica and INFN, Trieste (Italy); Calderini, G. [Laboratoire de Physique Nucleaire et de Hautes Énergies (LPNHE), Paris (France); Dipartimento di Fisica E. Fermi, Università di Pisa, Pisa (Italy); INFN Sez. di Pisa, Pisa (Italy); Chauveau, J. [Laboratoire de Physique Nucleaire et de Hautes Énergies (LPNHE), Paris (France); Giacomini, G. [Fondazione Bruno Kessler, Centro per i Materiali e i Microsistemi (FBK-CMM) Povo di Trento (Italy); La Rosa, A. [Section de Physique (DPNC), Université de Genève, Genève (Switzerland); Marchiori, G. [Laboratoire de Physique Nucleaire et de Hautes Énergies (LPNHE), Paris (France); Zorzi, N. [Fondazione Bruno Kessler, Centro per i Materiali e i Microsistemi (FBK-CMM) Povo di Trento (Italy)

    2013-12-01

    In view of the LHC upgrade phases towards HL-LHC, the ATLAS experiment plans to upgrade the inner detector with an all-silicon system. The n-on-p silicon technology is a promising candidate for the pixel upgrade thanks to its radiation hardness and cost effectiveness. The edgeless technology would allow for enlarging the area instrumented with pixel detectors. We report on the development of novel n-on-p edgeless planar pixel sensors fabricated at FBK (Trento, Italy), making use of the active edge concept for the reduction of the dead area at the periphery of the device. After discussing the sensor technology and fabrication process, we present device simulations (pre- and post-irradiation) performed for different sensor configurations. First preliminary results obtained with the test-structures of the production are shown.

  17. Novel silicon n-on-p edgeless planar pixel sensors for the ATLAS upgrade

    International Nuclear Information System (INIS)

    Bomben, M.; Bagolini, A.; Boscardin, M.; Bosisio, L.; Calderini, G.; Chauveau, J.; Giacomini, G.; La Rosa, A.; Marchiori, G.; Zorzi, N.

    2013-01-01

    In view of the LHC upgrade phases towards HL-LHC, the ATLAS experiment plans to upgrade the inner detector with an all-silicon system. The n-on-p silicon technology is a promising candidate for the pixel upgrade thanks to its radiation hardness and cost effectiveness. The edgeless technology would allow for enlarging the area instrumented with pixel detectors. We report on the development of novel n-on-p edgeless planar pixel sensors fabricated at FBK (Trento, Italy), making use of the active edge concept for the reduction of the dead area at the periphery of the device. After discussing the sensor technology and fabrication process, we present device simulations (pre- and post-irradiation) performed for different sensor configurations. First preliminary results obtained with the test-structures of the production are shown

  18. Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program

    Energy Technology Data Exchange (ETDEWEB)

    Crawford,C.; de Boer,G.; De Castro, K; Landers, Ph.D., J; Rogers, E

    2009-10-19

    The threat of nuclear terrorism has become a global concern. Many countries continue to make efforts to strengthen nuclear security by enhancing systems of nuclear material protection, control, and accounting (MPC&A). Though MPC&A systems can significantly upgrade nuclear security, they do not eliminate the "human factor." This paper will describe some of the key elements of a comprehensive, sustainable nuclear security culture enhancement program and how implementation can mitigate the insider threat.

  19. Immediate catalytic upgrading of soybean shell bio-oil

    International Nuclear Information System (INIS)

    Bertero, Melisa; Sedran, Ulises

    2016-01-01

    The pyrolysis of soybean shell and the immediate catalytic upgrading of the bio-oil over an equilibrium FCC catalyst was studied in order to define its potential as a source for fuels and chemicals. The experiments of pyrolysis and immediate catalytic upgrading were performed at 550 °C during 7 min with different catalysts to oil relationships in an integrated fixed bed pyrolysis-conversion reactor. The results were compared under the same conditions against those from pine sawdust, which is a biomass source commonly used for the production of bio-oil. In the pyrolysis the pine sawdust produced more liquids (61.4%wt.) than the soybean shell (54.7%wt.). When the catalyst was presented, the yield of hydrocarbons increased, particularly in the case of soybean shell, which was four time higher than in the pyrolysis. The bio-oil from soybean shell produced less coke (between 3.1 and 4.3%wt.) in its immediate catalytic upgrading than that from pine sawdust (between 5 and 5.8%wt.), due to its lower content of phenolic and other high molecular weight compounds (three and five times less, respectively). Moreover, soybean shell showed a higher selectivity to hydrocarbons in the gasoline range, with more olefins and less aromatic than pine sawdust. - Highlights: • Soybean shell is a possible source of fuels with benefits as compared to pine sawdust. • Bio-oils upgraded over FCC catalyst in an integrated pyrolysis-conversion reactor. • Pine sawdust bio-oil had more phenols than soybean shell bio-oil. • Soybean shell bio-oil produced more hydrocarbons in gasoline range and less coke.

  20. The CMS Pixel Detector Upgrade and R\\&D for the High Luminosity LHC

    CERN Document Server

    Viliani, Lorenzo

    2017-01-01

    The High Luminosity Large Hadron Collider (HL-LHC) at CERN is expected to collide protons at a centre-of-mass energy of 14\\,TeV and to reach an unprecedented peak instantaneous luminosity of $5 \\times 10^{34}\\,{\\rm cm}^{-2} {\\rm s}^{-1}$ with an average number of pileup events of 140. This will allow the ATLAS and CMS experiments to collect integrated luminosities of up to $3000\\,{\\rm fb}^{-1}$ during the project lifetime. To cope with this extreme scenario the CMS detector will be substantially upgraded before starting the HL-LHC, a plan known as CMS Phase-2 Upgrade. In the upgrade the entire CMS silicon pixel detector will be replaced and the new detector will feature increased radiation hardness, higher granularity and capability to handle higher data rate and longer trigger latency. In this report the Phase-2 Upgrade of the CMS silicon pixel detector will be reviewed, focusing on the features of the detector layout and on the development of new pixel devices.

  1. Clock and timing distribution in the LHCb upgraded detector and readout system

    CERN Document Server

    Alessio, F; Barros Marin, M; Cachemiche, JP; Hachon, F; Jacobsson, R; Wyllie, K

    2015-01-01

    The LHCb experiment is upgrading part of its detector and the entire readout system towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity and increase its trigger efficiency. In this paper, the new timing, trigger and control distribution system for such an upgrade is reviewed with particular attention given to the distribution of the clock and timing information across the entire readout system, up to the FE and the on-detector electronics. Current ideas are here presented in terms of reliability, jitter, complexity and implementation.

  2. Superconducting magnet development for the LHC upgrades

    International Nuclear Information System (INIS)

    Rossi, Lucio

    2012-01-01

    LHC is now delivering proton and heavy ion collisions at the highest energy. Upgrading the LHC beyond its design performance is a long term program that started during the LHC construction, with some fundamental R and D programs. The upgrade program is based on a vigorous superconductor and magnet R and D, aimed at increasing the field in accelerator magnets from 8 T to 12 T for the luminosity upgrade, with the scope of increasing the collider luminosity by a factor 5 to 10 from 2022. The upgrade program might continue with the LHC energy upgrade, which would require magnets producing field in the range of 16-20 T. The results obtained so far and the future challenges are discussed together with the possible plan to reach the goals. (author)

  3. The CMS ECAL Upgrade for Precision Crystal Calorimetry at the HL-LHC

    CERN Document Server

    Jofrehei, Arash

    2017-01-01

    The Compact Muon Solenoid Experiment (CMS) is operating at the Large Hadron Collider (LHC) with proton-proton collisions at 13 TeV center-of-mass energy and at a bunch spacing of 25 ns. Challenging running conditions for CMS are expected after the High-Luminosity upgrade of the LHC (HL-LHC). We review the CMS ECAL crystal calorimeter upgrade and present results from the first test beam studies. Particular challenges at HL-LHC are the harsh radiation environment, the increasing data rates and the extreme level of pile-up events, with up to 200 simultaneous proton-proton collisions. Precision timing can be exploited to reduce the effect of the pile-up. We report on the timing resolution studies performed with test-beams. We discuss the new readout and trigger electronics, which must be upgraded due to the increased trigger and latency requirements at the HL-LHC.

  4. Implementation of an advanced hybrid MPC-PID control system using PAT tools into a direct compaction continuous pharmaceutical tablet manufacturing pilot plant.

    Science.gov (United States)

    Singh, Ravendra; Sahay, Abhishek; Karry, Krizia M; Muzzio, Fernando; Ierapetritou, Marianthi; Ramachandran, Rohit

    2014-10-01

    It is desirable for a pharmaceutical final dosage form to be manufactured through a quality by design (QbD)-based approach rather than a quality by testing (QbT) approach. An automatic feedback control system coupled with PAT tools that is part of the QbD paradigm shift, has the potential to ensure that the pre-defined end product quality attributes are met in a time and cost efficient manner. In this work, an advanced hybrid MPC-PID control architecture coupled with real time inline/online monitoring tools and principal components analysis (PCA) based additional supervisory control layer has been proposed for a continuous direct compaction tablet manufacturing process. The advantages of both MPC and PID have been utilized in a hybrid scheme. The control hardware and software integration and implementation of the control system has been demonstrated using feeders and blending unit operation of a continuous tablet manufacturing pilot plant and an NIR based PAT tool. The advanced hybrid MPC-PID control scheme leads to enhanced control loop performance of the critical quality attributes in comparison to a regulatory (e.g. PID) control scheme indicating its potential to improve pharmaceutical product quality. Copyright © 2014 Elsevier B.V. All rights reserved.

  5. Machine and plasma diagnostic instrumentation systems for the Tandem Mirror Experiment Upgrade

    International Nuclear Information System (INIS)

    Coutts, G.W.; Coffield, F.E.; Lang, D.D.; Hornady, R.S.

    1981-01-01

    To evaluate performance of a second generation Tandem Mirror Machine, an extensive instrumentation system is being designed and installed as part of the major device fabrication. The systems listed will be operational during the start-up phase of the TMX Upgrade machine and provide bench marks for future performance data. In addition to plasma diagnostic instrumentation, machine parameter monitoring systems will be installed prior to machine operation. Simultaneous recording of machine parameters will permit evaluation of plasma parameters sensitive to machine conditions

  6. Numerically derived parametrisation of optimal RMP coil phase as a guide to experiments on ASDEX Upgrade

    Science.gov (United States)

    Ryan, D. A.; Liu, Y. Q.; Li, L.; Kirk, A.; Dunne, M.; Dudson, B.; Piovesan, P.; Suttrop, W.; Willensdorfer, M.; the ASDEX Upgrade Team; the EUROfusion MST1 Team

    2017-02-01

    Edge localised modes (ELMs) are a repetitive MHD instability, which may be mitigated or suppressed by the application of resonant magnetic perturbations (RMPs). In tokamaks which have an upper and lower set of RMP coils, the applied spectrum of the RMPs can be tuned for optimal ELM control, by introducing a toroidal phase difference {{Δ }}{{Φ }} between the upper and lower rows. The magnitude of the outermost resonant component of the RMP field | {b}{{res}}1| (other proposed criteria are discussed herein) has been shown experimentally to correlate with mitigated ELM frequency, and to be controllable by {{Δ }}{{Φ }} (Kirk et al 2013 Plasma Phys. Control. Fusion 53 043007). This suggests that ELM mitigation may be optimised by choosing {{Δ }}{{Φ }}={{Δ }}{{{Φ }}}{{opt}}, such that | {b}{{res}}1| is maximised. However it is currently impractical to compute {{Δ }}{{{Φ }}}{{opt}} in advance of experiments. This motivates this computational study of the dependence of the optimal coil phase difference {{Δ }}{{{Φ }}}{{opt}}, on global plasma parameters {β }N and q 95, in order to produce a simple parametrisation of {{Δ }}{{{Φ }}}{{opt}}. In this work, a set of tokamak equilibria spanning a wide range of ({β }N, q 95) is produced, based on a reference equilibrium from an ASDEX Upgrade experiment. The MARS-F code (Liu et al 2000 Phys. Plasmas 7 3681) is then used to compute {{Δ }}{{{Φ }}}{{opt}} across this equilibrium set for toroidal mode numbers n = 1-4, both for the vacuum field and including the plasma response. The computational scan finds that for fixed plasma boundary shape, rotation profiles and toroidal mode number n, {{Δ }}{{{Φ }}}{{opt}} is a smoothly varying function of ({β }N, q 95). A 2D quadratic function in ({β }N, q 95) is used to parametrise {{Δ }}{{{Φ }}}{{opt}}, such that for given ({β }N, q 95) and n, an estimate of {{Δ }}{{{Φ }}}{{opt}} may be made without requiring a plasma response computation. To quantify the uncertainty

  7. Completion of the brightness upgrade of the ALS

    International Nuclear Information System (INIS)

    Steier, C; Madur, A; Bailey, B; Berg, K; Biocca, A; Black, A; Casey, P; Colomb, D; Gunion, B; Li, N; Marks, S; Nishimura, H; Pappas, C; Petermann, K; Portmann, G; Prestemon, S; Rawlins, A; Robin, D; Rossi, S; Scarvie, T

    2014-01-01

    The Advanced Light Source (ALS) at Berkeley Lab remains one of the brightest sources for soft x-rays worldwide. A multiyear upgrade of the ALS is underway, which includes new and replacement x-ray beamlines, a replacement of many of the original insertion devices and many upgrades to the accelerator. The accelerator upgrade that affects the ALS performance most directly is the ALS brightness upgrade [1], which reduces the horizontal emittance from 6.3 to 2.0 nm (2.5 nm effective). Magnets for this upgrade were installed in late 2012 and early 2013 followed by user operation with the reduced emittance.

  8. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  9. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  10. ATLAS Future Plans: Upgrade and the Physics with High Luminosity

    Directory of Open Access Journals (Sweden)

    Rajagopalan S.

    2013-05-01

    Full Text Available The ATLAS experiment is planning a series of detector upgrades to cope with the planned increases in instantaneous luminosity and multiple interactions per crossing to maintain its physics capabilities. During the coming decade, the Large Hadron Collider will collide protons on protons at a center of mass energy up to 14 TeV with luminosities steadily increasing in a phased approach to over 5 × 1034 cm−2s−1. The resulting large data sets will significantly enhance the physics reach of the ATLAS detector building on the recent discovery of the Higgs-like boson. The planned detector upgrades being designed to cope with the increasing luminosity and its impact on the ATLAS physics program will be discussed.

  11. The phase-II ATLAS pixel tracker upgrade: layout and mechanics.

    CERN Document Server

    Sharma, Abhishek; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment will upgrade its tracking detector during the Phase-II LHC shutdown, to better take advantage of the increased luminosity of the HL-LHC. The upgraded tracker will consist of silicon-strip modules surrounding a pixel detector, and will likely cover an extended eta range, perhaps as far as |eta|<4.0. A number of layout and supporting-structure options are being considered for the pixel detector, with the final choice expected to be made in early 2017. The proposed supporting structures are based on lightweight, highly-thermally-conductive carbon-based materials and are cooled by evaporative carbon dioxide. The various layouts will be described and a description of the supporting structures will be presented, along with results from testing of prototypes.

  12. Performance of the first ASDEX Upgrade neutral beam injector

    International Nuclear Information System (INIS)

    Staebler, A.; Vollmer, O.; Feist, J.H.; Speth, E.; Heinemann, B.; Melkus, W.; Obermayer, S.; Riedl, R.; Schaerich, W.; Wittenbecher, K.

    1995-01-01

    Plasmas of the ASDEX Upgrade tokamak have been heated with H 0 beams of up to 7 MW and D 0 beams of up to 10 MW. Beam modulation allows to inject at any power level between zero and full power. Measurements characterizing the NBI system performance, the power accountability, and the operational experience obtained so far are discussed. (orig.)

  13. The Upgraded D0 detector

    Energy Technology Data Exchange (ETDEWEB)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U.

    2005-07-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  14. Upgrade of the ALICE Inner Tracking System

    OpenAIRE

    Reidt, Felix; Collaboration, for the ALICE

    2014-01-01

    During the Long Shutdown 2 of the LHC in 2018/2019, the ALICE experiment plans the installation of a novel Inner Tracking System. It will replace the current six layer detector system with a seven layer detector using Monolithic Active Pixel Sensors. The upgraded Inner Tracking System will have significantly improved tracking and vertexing capabilities, as well as readout rate to cope with the expected increased Pb-Pb luminosity of the LHC. The choice of Monolithic Active Pixel Sensors has be...

  15. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  16. Approaches for the integration of human factors into the upgrading and refurbishment of control rooms - Summary and conclusions - Principal Working Group 1 on Operating Experience and Human Factors

    International Nuclear Information System (INIS)

    2002-01-01

    A modern approach to control room design, be it for upgrading or complete refurbishment, requires the integration of many disciplines and approaches. The integration of human factors into such a process continues to present challenges. How such a process should be conceived, planned, and carried out is of considerable interest to designers, operators and regulators. Many NPPs around the world have been, or will be faced with decisions concerning modernization of their control rooms. Such changes can be driven by a range of issues including; the need to replace outdated control and instrumentation systems; increasing regulatory concern about human performance; or the need to provide a better process control environment for NPPs whose life cycles extend beyond that originally intended. Considering the importance of operator performance for safe and profitable operations, a process for ensuring that human factors issues are properly addressed could be central to the success or failure of such a project. Human factors is of particular importance when a combination of existing and new systems are to be used, resulting in a so-called 'hybrid' control room. The workshop addressed this topical area by providing a forum where a number of important areas could be discussed and experiences and lessons shared. Topics identified before hand as important and worthy of discussion included: - Exploration of how human factors issues can be identified. - Consideration of those processes and techniques necessary to ensure that appropriate requirements are specified, and that suitable data is gathered and analysed. - Identification and discussion of issues related to the above topics together with lessons from utilities, vendors and regulators which have faced, or are currently facing, these challenges. The meeting itself focused on the state of knowledge and current best practices within these areas and provided a forum for the open discussion of the human factors issues, as seen by

  17. Development of micromegas muon chambers for the ATLAS upgrade

    Science.gov (United States)

    Wotschack, J.

    2012-02-01

    Large-area particle detectors based on the bulk-micromegas technology are an attractive choice for the upgrade of LHC detectors and/or detectors for the ILC or other experiments. In the context of the R&D for the ATLAS Muon System upgrade, we have built detectors of order 1 m2. In order to overcome the spark problem in micromegas a novel protection scheme using resistive strips above the readout electrode has been developed. This technology has undergone extensive tests with hadron beams at the CERN-SPS, X-rays in the lab, as well as in a neutron beam. In addition, four 10 × 10 cm2 micromegas chambers have been installed in the ATLAS cavern and are taking data under LHC conditions. We will discuss the underlying design of the chambers and present results on the performance of these chambers.

  18. Development of micromegas muon chambers for the ATLAS upgrade

    International Nuclear Information System (INIS)

    Wotschack, J

    2012-01-01

    Large-area particle detectors based on the bulk-micromegas technology are an attractive choice for the upgrade of LHC detectors and/or detectors for the ILC or other experiments. In the context of the R and D for the ATLAS Muon System upgrade, we have built detectors of order 1 m 2 . In order to overcome the spark problem in micromegas a novel protection scheme using resistive strips above the readout electrode has been developed. This technology has undergone extensive tests with hadron beams at the CERN-SPS, X-rays in the lab, as well as in a neutron beam. In addition, four 10 × 10 cm 2 micromegas chambers have been installed in the ATLAS cavern and are taking data under LHC conditions. We will discuss the underlying design of the chambers and present results on the performance of these chambers.

  19. MAPS development for the ALICE ITS upgrade

    International Nuclear Information System (INIS)

    Yang, P.; Gao, C.; Huang, G.; Aglieri, G.; Cavicchioli, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Tobon, C.A. Marin; Mager, M.; Martinengo, P.; Chalmet, P.L.; Chanlek, N.; Collu, A.; Marras, D.; Kim, D.; Kim, J.; Lattuca, A.

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm 2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips

  20. Framework TDR for the LHCb Upgrade Technical Design Report

    CERN Document Server

    Bediaga, I; Ferreira Rodrigues, F; Magnin, J; Massafferri, A; Nasteva, I; dos Reis, A C; Amato, S; Carvalho Akiba, K; De Paula, L; Francisco, O; Gandelman, M; Gomes, A; Lopes, J H; Otalora Goicochea, J M; Polycarpo, E; Rangel, M S; Souza De Paula, B; Vieira, D; Göbel, C; Molina Rodriguez, J; Chen, P; Gao, Y; Gong, G; Gong, H; Jing, F; Li, L; Li, Y; Liu, B; Lu, H; Shao, B; Wu, S; Xue, T; Yang, Z; Yuan, X; Zeng, M; Zhang, F; Zhang, Y; Zhong, L; De Bonis, I; Decamp, D; Drancourt, C; Ghez, Ph; Hopchev, P; Lees, J -P; Machikhiliyan, I V; Minard, M -N; Pietrzyk, B; T'Jampens, S; Tisserand, V; Tournefier, E; Vouters, G; Ajaltouni, Z; Chanal, H; Cogneras, E; Deschamps, O; El Rifai, I; Henrard, P; Hoballah, M; Jahjah Hussein, M; Lefèvre, R; Li Gioi, L; Monteil, S; Niess, V; Perret, P; Roa Romero, D A; Sobczak, K; Adrover, C; Aslanides, E; Cachemiche, J -P; Cogan, J; Duval, P -Y; Hachon, F; Khanji, B; Le Gac, R; Leroy, O; Mancinelli, G; Maurice, E; Perrin-Terrin, M; Rethore, F; Sapunov, M; Serrano, J; Tsaregorodtsev, A; Barsuk, S; Beigbeder-Beau, C; Cacérès, T; Callot, O; Charlet, D; Duarte, O; He, J; Jean-Marie, B; Kochebina, O; Lefrançois, J; Machefert, F; Martín Sánchez, A; Nicol, M; Robbe, P; Schune, M -H; Teklishyn, M; Tocut, V; Viaud, B; Videau, I; Ben-Haim, E; Benayoun, M; David, P; Del Buono, L; Martens, A; Polci, F; Brambach, T; Cauet, Ch; Deckenhoff, M; Domke, M; Ekelhof, R; Kaballo, M; Karbach, T M; Kruse, F; Merkel, J; Rudloff, K; Schleich, S; Schlupp, M; Spaan, B; Swientek, S; Warda, K; Wishahi, J; Bauer, C; Britsch, M; Föhr, C; Fontana, M; Fuchs, H; Hofmann, W; Kihm, T; Popov, D; Schmelling, M; Volyanskyy, D; Voss, H; Zavertyaev, M; Bachmann, S; Bien, A; Blouw, J; Dordei, F; Färber, C; Gersabeck, E; Hansmann-Menzemer, S; Jaeger, A; Kreplin, K; Krocker, G; Linn, C; Marks, J; Meissner, M; Nikodem, T; Seyfert, P; Stahl, S; van Tilburg, J; Uwer, U; Wandernoth, S; Wiedner, D; Zhelezov, A; Grünberg, O; Hartmann, T; Voß, C; Waldi, R; Bifani, S; Farry, S; Ilten, P; Kechadi, T; Mathe, Z; McNulty, R; Wallace, R; Zhang, W C; Milanes, D A; Palano, A; Carbone, A; D'Antone, I; Derkach, D; Falabella, A; Galli, D; Lax, I; Marconi, U; Perazzini, S; Vagnoni, V; Valenti, G; Zangoli, M; Bonivento, W; Cadeddu, S; Cardini, A; Lai, A; Manca, G; Oldeman, R; Saitta, B; Baldini, W; Bozzi, C; Evangelisti, F; Landi, L; Mazurov, A; Savrie, M; Squerzanti, S; Vecchi, S; Bizzeti, A; Frosini, M; Graziani, G; Passaleva, G; Veltri, M; Anelli, M; Archilli, F; Bencivenni, G; Campana, P; Ciambrone, P; De Simone, P; Felici, G; Lanfranchi, G; Palutan, M; Saputi, A; Sarti, A; Sciascia, B; Soomro, F; Cardinale, R; Fontanelli, F; Patrignani, C; Petrolini, A; Calvi, M; Furcas, S; Giachero, A; Gotti, C; Kucharczyk, M; Maino, M; Matteuzzi, C; Pessina, G; Carboni, G; De Capua, S; Sabatino, G; Santovetti, E; Satta, A; Alves Jr, A A; Auriemma, G; Bocci, V; Martellotti, G; Penso, G; Pinci, D; Santacesaria, R; Satriano, C; Sciubba, A; Nisar, S; Morawski, P; Polok, G; Witek, M; Muryn, B; Oblakowska-Mucha, A; Senderowska, K; Szumlak, T; Guzik, Z; Nawrot, A; Szczekowski, M; Ukleja, A; Burducea, I; Coca, C; Dogaru, M; Grecu, A; Maciuc, F; Muresan, R; Orlandea, M; Pavel-Nicorescu, C; Popovici, B; Stoica, S; Straticiuc, M; Teodorescu, E; Alkhazov, G; Bochin, B; Bondar, N; Dzyuba, A; Gets, S; Golovtsov, V; Kashchuk, A; Maev, O; Matveev, M; Sagidova, N; Shcheglov, Y; Volkov, S; Vorobyev, A; Balagura, V; Belogurov, S; Belyaev, I; Egorychev, V; Golubkov, D; Kvaratskheliya, T; Savrina, D; Semennikov, A; Shatalov, P; Shevchenko, V; Zhokhov, A; Berezhnoy, A; Bogdanova, G; Komarov, I; Korolev, M; Leflat, A; Nikitin, N; Volkov, V; Zverev, E; Filippov, S; Gushchin, E; Karavichev, O; Kravchuk, L; Kudenko, Y; Laptev, S; Tikhonov, A; Bondar, A; Eidelman, S; Krokovny, P; Kudryavtsev, V; Shekhtman, L; Vorobyev, V; Artamonov, A; Belous, K; Dzhelyadin, R; Guz, Yu; Novoselov, A; Obraztsov, V; Ostankov, A; Romanovsky, V; Shapkin, M; Stenyakin, O; Yushchenko, O; Abellan Beteta, C; Calvo Gomez, M; Camboni, A; Casajus Ramo, A; Comerma-Montells, A; Domingo Bonal, F; Garrido, L; Gascon, D; Grabalosa Gándara, M; Graciani Diaz, R; Graugés, E; Lopez Asamar, E; Mauricio, J; Mendez-Munoz, V; Pérez-Calero Yzquierdo, A; Picatoste Olloqui, E; Pie Valls, B; Potterat, C; Puig Navarro, A; Rosello, M; Ruiz, H; Vazquez Gomez, R; Vilasis-Cardona, X; Adeva, B; Alvarez Cartelle, P; Cid Vidal, X; Dosil Suárez, A; Esperante Pereira, D; Fernandez Albor, V; Gallas Torreira, A; Hernando Morata, J A; Pazos Alvarez, A; Perez Trigo, E; Plo Casasus, M; Rodriguez Perez, P; Saborido Silva, J J; Sanmartin Sedes, B; Santamarina Rios, C; Seco, M; Vazquez Regueiro, P; Visniakov, J; Albrecht, J; Alessio, F; Barschel, C; Blake, T; Bonaccorsi, E; Brarda, L; Buytaert, J; Cattaneo, M; Chadaj, B; Charpentier, Ph; Chebbi, M; Ciba, K; Clemencic, M; Closier, J; Collins, P; Corajod, B; Corti, G; Couturier, B; D'Ambrosio, C; Decreuse, G; Dijkstra, H; Dumps, R; Ferro-Luzzi, M; Forty, R; Fournier, C; Frank, M; Frei, C; Gaspar, C; Gersabeck, M; Gligorov, V V; Granado Cardoso, L A; Gys, T; Haen, C; van Herwijnen, E; Jacobsson, R; Jamet, O; Jost, B; Karacson, M; Kristic, R; Lacarrere, D; Lanciotti, E; Langenbruch, C; Lindner, R; Liu, G; Martinez Santos, D; Matev, R; Neufeld, N; Panman, J; Pepe Altarelli, M; Piedigrossi, D; Rauschmayr, N; Roiser, S; Roy, L; Ruf, T; Schindler, H; Schmidt, B; Schneider, T; Schopper, A; Schwemmer, R; Stagni, F; Subbiah, V K; Teubert, F; Thomas, E; Tonelli, D; Ubeda Garcia, M; Ullaland, O; Vesterinen, M; Wicht, J; Witzeling, W; Wyllie, K; Zvyagin, A; Amhis, Y; Bay, A; Bernard, F; Blanc, F; Bressieux, J; Cowan, G A; Degaudenzi, H; Dupertuis, F; Fave, V; Frei, R; Gauvin, N; Haefeli, G; Jaton, P; Keune, A; Knecht, M; La Thi, V N; Lopez-March, N; Luisier, J; Märki, R; Muster, B; Nakada, T; Nguyen, A D; Nguyen-Mau, C; Prisciandaro, J; Rakotomiaramanana, B; Rouvinet, J; Schneider, O; Szczypka, P; Tourneur, S; Tran, M T; Veneziano, G; Anderson, J; Bernet, R; Büchler-Germann, A; Bursche, A; Chiapolini, N; De Cian, M; Elsasser, Ch; Müller, K; Palacios, J; Salzmann, C; Saornil Gamarra, S; Serra, N; Steinkamp, O; Straumann, U; Tobin, M; Vollhardt, A; Aaij, R; Ali, S; Band, H; Bauer, Th; van Beuzekom, M; van Beveren, V; Boer Rookhuizen, H; Ceelie, L; Coco, V; David, P N Y; De Bruyn, K; De Groen, P; van Eijk, D; Farinelli, C; Gromov, V; van der Heijden, B; Heijne, V; Hulsbergen, W; Jans, E; Jansen, F; Jansen, L; Jansweijer, P; Kluit, R; Koppenburg, P; Kozlinskiy, A; van Leerdam, J; Martinelli, M; Merk, M; Mous, I; Munneke, B; Oggero, S; van Overbeek, M; Pellegrino, A; van Petten, O; Roeland, E; de Roo, K; Schimmel, A; Schuijlenburg, H; Sluijk, T; Storaci, B; Tsopelas, P; Tuning, N; Vink, W; Wenerke, P; Wiggers, L; Zappon, F; Zwart, A; van den Brand, J; Dettori, F; Ketel, T; Koopman, R F; Kos, J; Lambert, R W; Mul, F; Raven, G; Schiller, M; Tolk, S; Dovbnya, A; Kandybei, S; Raniuk, I; Shapoval, I; Shevchenko, O; Iakovenko, V; Nikolaiko, Y; Okhrimenko, O; Pugatch, M; Pugatch, V; Faulkner, P J W; Kenyon, I R; Lazzeroni, C; McCarthy, J; Slater, M W; Watson, N K; Adinolfi, M; Benton, J; Brook, N H; Cook, A; Coombes, M; Hampson, T; Harnew, S T; Naik, P; Rademacker, J H; Solomin, A; Souza, D; Velthuis, J J; Voong, D; Barter, W; Bettler, M -O; Cliff, H V; Garra Tico, J; Gibson, V; Gregson, S; Haines, S C; Jones, C R; Sigurdsson, S; Ward, D R; Wotton, S A; Wright, S; Back, J J; Craik, D; Dossett, D; Gershon, T; Kreps, M; Latham, T; Pilař, T; Poluektov, A; Reid, M M; Silva Coutinho, R; Whitehead, M; Williams, M P; Easo, S; Nandakumar, R; Papanestis, A; Patrick, G N; Ricciardi, S; Wilson, F F; Benson, S; Clarke, P E L; Currie, R; Eisenhardt, S; Fitzpatrick, C; Lambert, D; Luo, H; Mejia, H; Muheim, F; Needham, M; Playfer, S; Sparkes, A; Xie, Y; Alexander, M; Beddow, J; Borghi, S; Eklund, L; Hynds, D; Ogilvy, S; Pappagallo, M; Rodrigues, E; Sail, P; Soler, F J P; Spradlin, P; Bowcock, T J V; Brown, H; Casse, G; Donleavy, S; Hennessy, K; Hicks, E; Huse, T; Hutchcroft, D; Liles, M; Patel, G D; Rinnert, K; Shears, T; Smith, N A; Carson, L; Ciezarek, G; Cunliffe, S; Egede, U; Golutvin, A; Hall, S; Owen, P; Parkinson, C J; Patel, M; Petridis, K; Richards, A; Savidge, T; Sepp, I; Shires, A; Websdale, D; Williams, M; Appleby, R B; Barlow, R J; Bird, T; Bjørnstad, P M; Brett, D; Harrison, J; Lafferty, G; McGregor, G; Moran, D; Parkes, C; Smith, M; Webber, A D; Brock, M; Charles, M; Harnew, N; John, J J; John, M; Malde, S; Nomerotski, A; Powell, A; Thomas, C; Topp-Joergensen, S; Wilkinson, G; Meadows, B; Sokoloff, M D; Artuso, M; Blusk, S; Borgia, A; Britton, T; Garofoli, J; Gui, B; Hadjivasiliou, C; Mountain, R; Pal, B K; Phan, A; Qian, W; Skwarnicki, T; Stone, S; Wang, J; Xing, Z; Zhang, L

    2012-01-01

    This document is a Framework Technical Design Report for the upgrade of the LHCb experiment. It adds to the information in the Letter of Intent, in particular concerning the foreseen schedule, cost and participating institutes. Updates are given for the physics performance, based on the experience gained with the first full year of data taking, on the detector requirements and the progress of the sub-system R&D. Within the framework presented here, it is expected that the individual sub-system TDRs will follow on completion of the R&D phase in the next year.

  1. Upgrading Probability via Fractions of Events

    Directory of Open Access Journals (Sweden)

    Frič Roman

    2016-08-01

    Full Text Available The influence of “Grundbegriffe” by A. N. Kolmogorov (published in 1933 on education in the area of probability and its impact on research in stochastics cannot be overestimated. We would like to point out three aspects of the classical probability theory “calling for” an upgrade: (i classical random events are black-and-white (Boolean; (ii classical random variables do not model quantum phenomena; (iii basic maps (probability measures and observables { dual maps to random variables have very different “mathematical nature”. Accordingly, we propose an upgraded probability theory based on Łukasiewicz operations (multivalued logic on events, elementary category theory, and covering the classical probability theory as a special case. The upgrade can be compared to replacing calculations with integers by calculations with rational (and real numbers. Namely, to avoid the three objections, we embed the classical (Boolean random events (represented by the f0; 1g-valued indicator functions of sets into upgraded random events (represented by measurable {0; 1}-valued functions, the minimal domain of probability containing “fractions” of classical random events, and we upgrade the notions of probability measure and random variable.

  2. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  3. Criticality benchmark comparisons leading to cross-section upgrades

    International Nuclear Information System (INIS)

    Alesso, H.P.; Annese, C.E.; Heinrichs, D.P.; Lloyd, W.R.; Lent, E.M.

    1993-01-01

    For several years criticality benchmark calculations with COG. COG is a point-wise Monte Carlo code developed at Lawrence Livermore National Laboratory (LLNL). It solves the Boltzmann equation for the transport of neutrons and photons. The principle consideration in developing COG was that the resulting calculation would be as accurate as the point-wise cross-sectional data, since no physics computational approximations were used. The objective of this paper is to report on COG results for criticality benchmark experiments in concert with MCNP comparisons which are resulting in corrections an upgrades to the point-wise ENDL cross-section data libraries. Benchmarking discrepancies reported here indicated difficulties in the Evaluated Nuclear Data Livermore (ENDL) cross-sections for U-238 at thermal neutron energy levels. This led to a re-evaluation and selection of the appropriate cross-section values from several cross-section sets available (ENDL, ENDF/B-V). Further cross-section upgrades anticipated

  4. Study for the LHCb upgrade read-out board

    CERN Document Server

    Cachemiche, J P; Hachon, F; Le Gac, R; Marin, F; 10.1088/1748-0221/5/12/C12036

    2010-01-01

    The LHCb experiment envisages to upgrade its readout electronics in order to increase the readout rate from 1 MHz to 40 MHz. This electronics upgrade is very challenging, since readout boards will have to handle a higher number of serial links with an increased bandwidth. In addition, the new communication protocol (GBT) developed by the CERN micro-electronics group mixes data acquisition, slow control and clock distribution on the same link. To explore the feasibility of such a readout system, elementary building blocks have been studied. Their goals are multiple: understand signal integrity when using highly integrated high speed serial links running at 8 - 10 Gbits/s; test the implementation of the GBT protocol within FPGAs; understand advantages and limitations of commercial standard with a predefined interconnection topology; validate ideas on how to control easily such a system. We designed two boards compliant with the xTCA standard which meets an increasing interest in the physics community. The first...

  5. System and process for upgrading hydrocarbons

    Science.gov (United States)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  6. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  7. Status of the new multi-frequency ECRH system for ASDEX Upgrade

    DEFF Research Database (Denmark)

    Wagner, D.; Grünwald, G.; Leuterer, F.

    2008-01-01

    Currently, a new multi-frequency ECRH system is under construction at the ASDEX Upgrade tokamak experiment. This system employs, for the first time in a fusion device, multi-frequency gyrotrons, step-tunable in the range 105-140 GHz. The first two gyrotrons, working at 105 and 140 GHz, were...

  8. The CMS ECAL Upgrade for Precision Crystal Calorimetry at the HL-LHC

    CERN Document Server

    Petyt, David Anthony

    2018-01-01

    The electromagnetic calorimeter (ECAL) of the Compact Muon Solenoid Experiment (CMS) is operating at the Large Hadron Collider (LHC) in 2016 with proton-proton collisions at 13 TeV center-of-mass energy and at a bunch spacing of 25 ns. Challenging running conditions for CMS are expected after the High-Luminosity upgrade of the LHC (HL-LHC). We review the design and R and D studies for the CMS ECAL crystal calorimeter upgrade and present first test beam studies. Particular challenges at HL-LHC are the harsh radiation environment, the increasing data rates and the extreme level of pile-up events, with up to 200 simultaneous proton-proton collisions. We present test beam results of hadron irradiated PbWO$_{4}$ crystals up to fluences expected at the HL-LHC. We also report on the R and D for the new readout and trigger electronics, which must be upgraded due to the increased trigger and latency requirements at the HL-LHC.

  9. The upgraded CDF front end electronics for calorimetry

    Energy Technology Data Exchange (ETDEWEB)

    Drake, G.; Frei, D.; Hahn, S.R.; Nelson, C.A.; Segler, S.L.; Stuermer, W.

    1991-11-01

    The front end electronics used in the calorimetry of the CDF detector has been upgraded to meet system requirements for higher expected luminosity. A fast digitizer utilizing a 2 {mu}Sec, 16 bit ADC has been designed and built. Improvements to the front end trigger circuitry have been implemented, including the production of 900 new front end modules. Operational experience with the previous system is presented, with discussion of the problems and performance goals.

  10. The upgraded CDF front end electronics for calorimetry

    International Nuclear Information System (INIS)

    Drake, G.; Frei, D.; Hahn, S.R.; Nelson, C.A.; Segler, S.L.; Stuermer, W.

    1991-11-01

    The front end electronics used in the calorimetry of the CDF detector has been upgraded to meet system requirements for higher expected luminosity. A fast digitizer utilizing a 2 μSec, 16 bit ADC has been designed and built. Improvements to the front end trigger circuitry have been implemented, including the production of 900 new front end modules. Operational experience with the previous system is presented, with discussion of the problems and performance goals

  11. PSI: Upgrading

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade

  12. PSI: Upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-09-15

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade.

  13. Runaway electron mitigation by 3D fields in the ASDEX-Upgrade experiment

    Science.gov (United States)

    Gobbin, M.; Li, L.; Liu, Y. Q.; Marrelli, L.; Nocente, M.; Papp, G.; Pautasso, G.; Piovesan, P.; Valisa, M.; Carnevale, D.; Esposito, B.; Giacomelli, L.; Gospodarczyk, M.; McCarthy, P. J.; Martin, P.; Suttrop, W.; Tardocchi, M.; Teschke, M.; the ASDEX Upgrade Team; the EUROfusion MST1 Team

    2018-01-01

    Disruption-generated runaway electron (RE) beams represent a severe threat for tokamak plasma-facing components in high current devices like ITER, thus motivating the search of mitigation techniques. The application of 3D fields might aid this purpose and recently was investigated also in the ASDEX Upgrade experiment by using the internal active saddle coils (termed B-coils). Resonant magnetic perturbations (RMPs) with dominant toroidal mode number n = 1 have been applied by the B-coils, in a RE specific scenario, before and during disruptions, which are deliberately created via massive gas injection. The application of RMPs affects the electron temperature profile and seemingly changes the dynamics of the disruption; this results in a significantly reduced current and lifetime of the generated RE beam. A similar effect is observed also in the hard-x-ray (HXR) spectrum, associated to RE emission, characterized by a partial decrease of the energy content below 1 MeV when RMPs are applied. The strength of the observed effects strongly depends on the upper-to-lower B-coil phasing, i.e. on the poloidal spectrum of the applied RMPs, which has been reconstructed including the plasma response by the code MARS-F. A crude vacuum approximation fails in the interpretation of the experimental findings: despite the relatively low β (< 0.5 % ) of these discharges, a modest amplification (factor of 2) of the edge kink response occurs, which has to be considered to explain the observed suppression effects.

  14. Installation and Commissioning of the CMS Level-1 Calorimeter Trigger Upgrade

    CERN Document Server

    AUTHOR|(CDS)2071552; Aggleton, Robin Cameron; Baber, Mark David John; Barbieri, Richard Alexander; Belknap, Donald Austin; Berryhill, Jeffrey; Brooke, James John; Bundock, Aaron; Cali, Ivan Amos; Cepeda, Maria Luisa; Dasgupta, Sudeshna; da Silva, J.C; Dasu, Sridhara Rao; Durkin, Timothy John; Fobes, Robert William; Ghabrous Larrea, Carlos; Gorski, Thomas; Grimes, Mark; Guilbaud, Maxime; Guo, Z; Hall, Geoffrey; Harder, Kristian; Harper, Sam; Iles, Gregory Michiel; Innocenti, Gian Michele; Ives, Sarah Joanne; Jones, John; Kreis, Benjamin Jonah; Lee, Y; Li, W; Lucas, Christopher; Lucas, Robyn Elizabeth; Marrouche, Jad; Newbold, David; Northup, Michael; Oljavo, I; Paramesvaran, Sudarshan; Rivera, Ryan Allen; Roland, Christof; Rose, A; Sankey, D; Smith, Wesley; Svetek, Ales; Tapper, Alexander; Thea, Alessandro; Tikalsky, Jesra Lilah; Uplegger, Lorenzo; Vicente, Marcelo; Williams, Thomas Stephen; Wyslouch, Boleslaw

    2016-01-01

    The Compact Muon Solenoid (CMS) experiment is currently installing upgrades to their Calorimeter Trigger for LHC Run 2 to ensure that the trigger thresholds can stay low, and physics data collection will not be compromised. The electronics will be upgraded in two stages. Stage-1 for 2015 will upgrade some electronics and links from copper to optical in the existing calorimeter trigger so that the algorithms can be improved and we do not lose valuable data before stage-2 can be fully installed by 2016. Stage-2 will fully replace the calorimeter trigger at CMS with a micro-TCA and optical link system. It requires that the updates to the calorimeter back-ends, the source of the trigger primitives, be completed. The new systemâ??s boards will utilize Xilinx Virtex-7 FPGAs and have hundreds of high-speed links operating at up to 10 Gbps to maximize data throughput. The integration, commissioning, and installation of stage-1 in 2015 will be described, as well as the integration and parallel installation of th...

  15. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    AUTHOR|(CDS)2080489; Flouris, Gianis; Fulcher, Jonathan; Loukas, Nikitas; Paradas, Evangelos; Reis,Thomas; Sakulin, Hannes; Wulz, Claudia-Elisabeth

    2016-01-01

    To maintain the excellent performance shown during the LHCs Run-1 the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade is the re-organization of the muon trigger path from a subsystem-centric view in which hits in the drift tubes (DT), the cathode strip chambers (CSC), and the resistive plate chambers (RPC) were treated separately in dedicated track-finding systems to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged at the track-finding level. This fundamental restructuring of the muon trigger system required the development of a system to receive track candidates from the track-finding layer, remove potential duplicate tracks, and forward the best candidates to the global decision layer.An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger ($\\mu$GMT). B...

  16. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    Rabady, Dinyar; Carlin, Roberto; Codispoti, Giuseppe; Dallavalle, Marco; Erö, Janos; Flouris, Giannis; Foudas, Costas; Fulcher, Jonathan; Guiducci, Luigi; Loukas, Nikitas; Mallios, Stavros; Manthos, Nikos; Papadopoulos, Ioannis; Paradas, Evangelos; Reis, Thomas; Sakulin, Hannes; Sphicas, Paris; Triossi, Andrea; Venturi, Andrea; Wulz, Claudia-Elisabeth

    2016-01-01

    To maintain the excellent performance of the LHC during its Run-1 also in Run-2, the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade was the re-organisation of the muon trigger path from a subsystem-centric view in which hits in the drift tubes, the cathode strip chambers, and the resistive plate chambers were treated separately in dedicated track-finding systems, to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged already at the track-finding level. This also required the development of a new system to sort as well as cancel-out the muon tracks found by each system. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger (µGMT). While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the µGMT i...

  17. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    Battilana, Carlo; Codispoti, Giuseppe; Dallavalle, Gaetano-Marco; Ero, Janos; Flouris, Giannis; Fountas, Konstantinos; Fulcher, Jonathan Richard; Guiducci, Luigi; Loukas, Nikitas; Mallios, Stavros; Manthos, Nikolaos; Papadopoulos, Ioannis; Paradas, Evangelos; Rabady, Dinyar Sebastian; Reis, Thomas; Sakulin, Hannes; Sphicas, Paraskevas; Triossi, Andrea; Venturi, Andrea; Wulz, Claudia

    2016-01-01

    To maintain the excellent performance of the LHC during its Run-1 also in Run-2, the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade was the re-organisation of the muon trigger path from a subsystem-centric view in which hits in the drift tubes, the cathode strip chambers, and the resistive plate chambers were treated separately in dedicated track-finding systems, to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged already at the track-finding level. This also required the development of a new system to sort as well as cancel-out the muon tracks found by each system. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger ($\\mu$GMT). While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the $\\m...

  18. Upgrade of the CMS muon trigger system in the barrel region

    CERN Document Server

    Rabady, Dinyar; Carlin, Roberto; Codispoti, Giuseppe; Dallavalle, Marco; Erö, Janos; Flouris, Giannis; Foudas, Costas; Fulcher, Jonathan; Guiducci, Luigi; Loukas, Nikitas; Mallios, Stavros; Manthos, Nikos; Papadopoulos, Ioannis; Paradas, Evangelos; Reis, Thomas; Sakulin, Hannes; Sphicas, Paris; Triossi, Andrea; Venturi, Andrea; Wulz, Claudia-Elisabeth

    2017-01-01

    To maintain the excellent performance of the LHC during its Run-1 also in Run-2, the Level-1 Trigger of the Compact Muon Solenoid experiment underwent a significant upgrade. One part of this upgrade was the re-organisation of the muon trigger path from a subsystem-centric view in which hits in the drift tubes, the cathode strip chambers, and the resistive plate chambers were treated separately in dedicated track-finding systems, to one in which complementary detector systems for a given region (barrel, overlap, and endcap) are merged already at the track-finding level. This also required the development of a new system to sort as well as cancel-out the muon tracks found by each system. An overview will be given of the new track-finder system for the barrel region, the Barrel Muon Track Finder (BMTF) as well as the cancel-out and sorting layer, the upgraded Global Muon Trigger (µGMT). While the BMTF improves on the proven and well-tested algorithms used in the Drift Tube Track Finder during Run-1, the µGMT i...

  19. Flexible trigger menu implementation on the Global Trigger for the CMS Level-1 trigger upgrade

    CERN Document Server

    Matsushita, Takashi

    2017-01-01

    The CMS experiment at the Large Hadron Collider (LHC) has continued to explore physics at the high-energy frontier in 2016. The integrated luminosity delivered by the LHC in 2016 was 41~fb$^{-1}$ with a peak luminosity of 1.5 $\\times$ 10$^{34}$ cm$^{-2}$s$^{-1}$ and peak mean pile-up of about 50, all exceeding the initial estimations for 2016. The CMS experiment has upgraded its hardware-based Level-1 trigger system to maintain its performance for new physics searches and precision measurements at high luminosities. The Global Trigger is the final step of the CMS \\mbox{Level-1} trigger and implements a trigger menu, a set of selection requirements applied to the final list of objects from calorimeter and muon triggers, for reducing the 40 MHz collision rate to 100 kHz. The Global Trigger has been upgraded with state-of-the-art FPGA processors on Advanced Mezzanine Cards with optical links running at 10 GHz in a MicroTCA crate. The powerful processing resources of the upgraded system enable implemen...

  20. Nutritional upgrading for omnivorous carpenter ants by the endosymbiont Blochmannia

    Directory of Open Access Journals (Sweden)

    Mueller Martin J

    2007-10-01

    Full Text Available Abstract Background Carpenter ants (genus Camponotus are considered to be omnivores. Nonetheless, the genome sequence of Blochmannia floridanus, the obligate intracellular endosymbiont of Camponotus floridanus, suggests a function in nutritional upgrading of host resources by the bacterium. Thus, the strongly reduced genome of the endosymbiont retains genes for all subunits of a functional urease, as well as those for biosynthetic pathways for all but one (arginine of the amino acids essential to the host. Results Nutritional upgrading by Blochmannia was tested in 90-day feeding experiments with brood-raising in worker-groups on chemically defined diets with and without essential amino acids and treated or not with antibiotics. Control groups were fed with cockroaches, honey water and Bhatkar agar. Worker-groups were provided with brood collected from the queenright mother-colonies (45 eggs and 45 first instar larvae each. Brood production did not differ significantly between groups of symbiotic workers on diets with and without essential amino acids. However, aposymbiotic worker groups raised significantly less brood on a diet lacking essential amino acids. Reduced brood production by aposymbiotic workers was compensated when those groups were provided with essential amino acids in their diet. Decrease of endosymbionts due to treatment with antibiotic was monitored by qRT-PCR and FISH after the 90-day experimental period. Urease function was confirmed by feeding experiments using 15N-labelled urea. GC-MS analysis of 15N-enrichment of free amino acids in workers revealed significant labelling of the non-essential amino acids alanine, glycine, aspartic acid, and glutamic acid, as well as of the essential amino acids methionine and phenylalanine. Conclusion Our results show that endosymbiotic Blochmannia nutritionally upgrade the diet of C. floridanus hosts to provide essential amino acids, and that it may also play a role in nitrogen recycling

  1. The D0 detector upgrade

    International Nuclear Information System (INIS)

    Bross, A.D.

    1995-02-01

    The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector

  2. Public-Interest Benefit Evaluation of Partial- Upgrading Technology

    Directory of Open Access Journals (Sweden)

    G. Kent Fellows

    2017-01-01

    Full Text Available Approximately 60 per cent of Alberta’s oil sands production is non-upgraded bitumen which, after being mixed with a diluting agent (diluent to allow transport, is exported. A popular view within Alberta — and particularly among Albertan politicians — is that a much larger share of oil sands bitumen should be upgraded in the province. However, without public subsidies or government underwriting, it is uneconomic to build and operate new facilities in Alberta to fully upgrade the bitumen into synthetic crude oil. But there are new partial upgrading technologies being developed that, subject to successful testing at a larger (commercial pilot scale, can prove to be not only economic in Alberta, but also generate large social and economic benefits for the province. The advantages include a much smaller capital investment, a significant increase in the value of the product and market for the product and, even more importantly, a dramatic reduction in the need for large amounts of expensive diluent to transport the product to market. Indeed, the only diluent required will be that to move the bitumen from the production site to the partial upgrader and this can be continually recycled. The market for the synthetic crude oil produced by full upgrading is only getting tougher. Any Alberta bitumen fully upgraded here would compete closely with the rapidly expanding supply of light U.S. unconventional oil. Partial upgrading does not upgrade bitumen to a light crude, but to something resembling more of a medium or heavy crude, and at a lower cost per barrel than full upgrading. Unlike in the increasingly crowded light-crude market, the Alberta Royalty Review Advisory Panel recognized that currently there are gaps in several North American refineries that could be filled by this partially upgraded Alberta oil. A partial upgrader serving that less-competitive market not only appears to hold the potential for investors to make attractive returns in the

  3. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  4. Upgrade of the CMS Event Builder

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    The Data Acquisition (DAQ) system of the Compact Muon Solenoid (CMS) experiment at CERN assembles events at a rate of 100 kHz, transporting event data at an aggregate throughput of 100 GB/s. By the time the LHC restarts after the 2013/14 shut-down, the current compute nodes and networking infrastructure will have reached the end of their lifetime. We are presenting design studies for an upgrade of the CMS event builder based on advanced networking technologies such as 10 Gb/s Ethernet. We report on tests and performance measurements with small-scale test setups.

  5. LHCb : Clock and timing distribution in the LHCb upgraded detector and readout system

    CERN Multimedia

    Alessio, Federico; Barros Marin, M; Cachemiche, JP; Hachon, F; Jacobsson, Richard; Wyllie, Ken

    2014-01-01

    The LHCb experiment is upgrading part of its detector and the entire readout system towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity and increase its trigger efficiency. In this paper, the new timing, trigger and control distribution system for such an upgrade is reviewed with particular attention given to the distribution of the clock and timing information across the entire readout system, up to the FE and the on-detector electronics. Current ideas are here presented in terms of reliability, jitter, complexity and implementation.

  6. Initial performance of upgraded Tevatron cryogenic systems

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab began operating a re-designed satellite refrigerator systems in November 1993. Upgrades were installed to operate the Tevatron at a magnet temperature of 3.5 K, approximately 1K lower than the original design. Refrigerator upgrades included new valve boxes, larger reciprocating expanders, the installation of cold vapor compressors, new sub-atmospheric instrumentation and an entirely new distributed controls system. Cryogenic system reliability data for Colliding Physics Run 1B is presented emphasizing a failure analysis for each aspect of the upgrade. Comparison to data for Colliding Physics Run 1A (previous to upgrade) is presented to show the impact of a major system overhaul. New operational problems and their solutions are presented in detail

  7. Analysis of Energy Industry Upgrading in Northeast China

    Science.gov (United States)

    Liu, Xiao-jing; Ji, Yu-liang; Guan, Bai-feng; Jing, Xin

    2018-02-01

    Promoting regional economic growth and realizing the transformation of the mode of economic growth are in industrial upgrading essence The product is a carrier that represents a series of links of production, management and marketing behind the enterprise, and is a comprehensive reflection of the knowledge and ability of a country or region. Based on the industrial spatial structure, this paper visualizes the industrial space in Northeast China from 2005 to 2015, analyzes the comparative advantages of the energy industry in Northeast China, and examines the status quo of the upgrade of the energy industry according to the industrial upgrading status. Based on the industrial spatial structure, Industry intensity in the industrial space, put forward the future direction of the energy industry upgrade and upgrade path.

  8. ”Are CRT upgrade procedures more complex and associated with more complications than de novo CRT implantations?” A single centre experience

    NARCIS (Netherlands)

    Ter Horst, I. A H; Kuijpers, Y.; van t Sant, Jetske; Tuinenburg, A. E.; Cramer, M. J.; Meine, M.

    2016-01-01

    Objective The objective of the study was to examine whether cardiac resynchronisation therapy upgrade procedures are more complex and associated with more complications than de novo implantations. Method We retrospectively compared 134 upgrade procedures performed between 2006-2012 with a random,

  9. Comparison of runaway electron generation parameters in small, medium-sized and large tokamaks—A survey of experiments in COMPASS, TCV, ASDEX-Upgrade and JET

    Science.gov (United States)

    Plyusnin, V. V.; Reux, C.; Kiptily, V. G.; Pautasso, G.; Decker, J.; Papp, G.; Kallenbach, A.; Weinzettl, V.; Mlynar, J.; Coda, S.; Riccardo, V.; Lomas, P.; Jachmich, S.; Shevelev, A. E.; Alper, B.; Khilkevitch, E.; Martin, Y.; Dux, R.; Fuchs, C.; Duval, B.; Brix, M.; Tardini, G.; Maraschek, M.; Treutterer, W.; Giannone, L.; Mlynek, A.; Ficker, O.; Martin, P.; Gerasimov, S.; Potzel, S.; Paprok, R.; McCarthy, P. J.; Imrisek, M.; Boboc, A.; Lackner, K.; Fernandes, A.; Havlicek, J.; Giacomelli, L.; Vlainic, M.; Nocente, M.; Kruezi, U.; COMPASS Team; TCV Team; ASDEX-Upgrade Team; EUROFusion MST1 Team; contributors, JET

    2018-01-01

    This paper presents a survey of the experiments on runaway electrons (RE) carried out recently in frames of EUROFusion Consortium in different tokamaks: COMPASS, ASDEX-Upgrade, TCV and JET. Massive gas injection (MGI) has been used in different scenarios for RE generation in small and medium-sized tokamaks to elaborate the most efficient and reliable ones for future RE experiments. New data on RE generated at disruptions in COMPASS and ASDEX-Upgrade was collected and added to the JET database. Different accessible parameters of disruptions, such as current quench rate, conversion rate of plasma current into runaways, etc have been analysed for each tokamak and compared to JET data. It was shown, that tokamaks with larger geometrical sizes provide the wider limits for spatial and temporal variation of plasma parameters during disruptions, thus extending the parameter space for RE generation. The second part of experiments was dedicated to study of RE generation in stationary discharges in COMPASS, TCV and JET. Injection of Ne/Ar have been used to mock-up the JET MGI runaway suppression experiments. Secondary RE avalanching was identified and quantified for the first time in the TCV tokamak in RE generating discharges after massive Ne injection. Simulations of the primary RE generation and secondary avalanching dynamics in stationary discharges has demonstrated that RE current fraction created via avalanching could achieve up to 70-75% of the total plasma current in TCV. Relaxations which are reminiscent the phenomena associated to the kinetic instability driven by RE have been detected in RE discharges in TCV. Macroscopic parameters of RE dominating discharges in TCV before and after onset of the instability fit well to the empirical instability criterion, which was established in the early tokamaks and examined by results of recent numerical simulations.

  10. Experience in the upgrading of radioactive waste disposal facility 'Ekores'

    International Nuclear Information System (INIS)

    Rozdyalovskaya, L.

    2000-01-01

    The national Belarus radioactive disposal facility 'Ekores' is designed for waste from nuclear applications in industry, medicine and research. Currently 12-20 tons of waste and over 6000 various types spent sources annually come to the 'Ekores'. Total activity in the vaults is evaluated as 352.8 TBq. Approximately 150 000 spent sources disposed of in the vaults and wells have total activity about 1327 TBq. In 1997 the Government initiated a project for the facility reconstruction in order to upgrade radiological safety of the site by creating adequate safety conditions for managing and storage of the waste. The reconstruction project developed by Belarus specialists has been reviewed by IAEA experts. This covers modernising technologies for new coming waste and also that the waste currently disposed in the pits is retrieved, sorted and treated in the same way as the new coming waste

  11. The upgrade of the muon system of the CMS experiment

    CERN Document Server

    Abbrescia, Marcello

    2014-01-01

    The CMS muon system is based on three types of gaseous detectors, RPC, CSC and DT. While operating very well in the present conditions, upgrades are foreseen for each of the subsystems, necessary to cope with the increased pile-up, coming along with higher rates and radiation, during the upcoming periods of data taking.Moreover, an important issue will be to make the system able to perform its delicate task of muon triggering and tracking also in the High Luminosity phase of LHC, foreseen to start after Long Shutdown 3 in 2023 and to last for about 10 years.Studies devoted to asses the system perfomance stability for the future will be presented. In addition, the stategy - which is being developed - to complement the existing system with new detectors, based on GEM or improved RPC technologies, will be shown.

  12. Initial results in SST-1 after up-gradation

    Science.gov (United States)

    Pradhan, S.; Khan, Z.; Tanna, V. L.; Prasad, U.; Paravastu, Y.; Raval, D. C.; Masand, H.; Kumar, Aveg; Dhongde, J. R.; Jana, S.; Kakati, B.; Patel, K. B.; Bhandarkar, M. K.; Shukla, B. K.; Ghosh, D.; Patel, H. S.; Parekh, T. J.; Mansuri, I. A.; Dhanani, K. R.; Varadharajulu, A.; Khristi, Y. S.; Biswas, P.; Gupta, C. N.; George, S.; Semwal, P.; Sharma, D. K.; Gulati, H. K.; Mahajan, K.; Praghi, B. R.; Banaudha, M.; Makwana, A. R.; Chudasma, H. H.; Kumar, M.; Manchanda, R.; Joisa, Y. S.; Asudani, K.; Pandya, S. N.; Pathak, S. K.; Banerjee, S.; Patel, P. J.; Santra, P.; Pathan, F. S.; Chauhan, P. K.; Khan, M. S.; Thankey, P. L.; Prakash, A.; Panchal, P. N.; Panchal, R. N.; Patel, R. J.; Mahsuria, G. I.; Sonara, D. P.; Patel, K. M.; Jayaswal, S. P.; Sharma, M.; Patel, J. C.; Varmora, P.; Srikanth, G. L. N.; Christian, D. R.; Garg, A.; Bairagi, N.; Babu, G. R.; Panchal, A. G.; Vora, M. M.; Singh, A. K.; Sharma, R.; Nimavat, H. D.; Shah, P. R.; Purwar, G.; Raval, T. Y.; Sharma, A. L.; Ojha, A.; Kumar, S.; Ramaiya, N. K.; Siju, V.; Gopalakrishna, M. V.; Kumar, A.; Sharma, P. K.; Atrey, P. K.; Kulkarni, SV; Ambulkar, K. K.; Parmar, P. R.; Thakur, A. L.; Raval, J. V.; Purohit, S.; Mishra, P. K.; Adhiya, A. N.; Nagora, U. C.; Thomas, J.; Chaudhari, V. K.; Patel, K. G.; Dalakoti, S.; Virani, C. G.; Gupta, S.; Kumar, Ajay; Chaudhari, B.; Kaur, R.; Srinivasan, R.; Raju, D.; Kanabar, D. H.; Jha, R.; Das, A.; Bora, D.

    2017-04-01

    SST-1 Tokamak has recently completed the 1st phase of up-gradation with successful installation and integration of all its First Wall components. The First Wall of SST-1 comprises of ∼ 3800 high heat flux compatible graphite tiles being assembled and installed on 132 CuCrZr heat sink back plates engraved with ∼ 4 km of leak tight baking and cooling channels in five major sub groups equipped with ∼ 400 sensors and weighing ∼ 6000 kg in total in thirteen isolated galvanic and six isolated hydraulic circuits. The phase-1 up-gradation spectrum also includes addition of Supersonic Molecular Beam Injection (SMBI) both on the in-board and out-board side, installation of fast reciprocating probes, adding some edge plasma probe diagnostics in the SOL region, installation and integration of segmented and up-down symmetric radial coils aiding/controlling plasma rotations, introduction of plasma position feedback and density controls etc. Post phase-I up-gradation spanning from Nov 2014 till June 2016, initial plasma experiments in up-graded SST-1 have begun since Aug 2016 after a brief engineering validation period in SST-1. The first experiments in SST-1 have revealed interesting aspects on the ‘eddy currents in the First Wall support structures’ influencing the ‘magnetic Null evolution dynamics’ and the subsequent plasma start-up characteristics after the ECH pre-ionization, the influence of the first walls on the ‘field errors’ and the resulting locked modes observed, the magnetic index influencing the evolution of the equilibrium of the plasma column, low density supra-thermal electron induced discharges and normal ohmic discharges etc. Presently; repeatable ohmic discharges regimes in SST-1 having plasma currents in excess of 65 KA (qa ∼ 3.8, BT = 1.5 T) with a current ramp rates ∼ 1.2 MA/s over a duration of ∼ 300 ms with line averaged densities ∼ 0.8 × 1019 and temperatures ∼ 200 eV with copious MHD signatures have been experimentally

  13. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  14. OMEGA upgrade staging options

    International Nuclear Information System (INIS)

    Kelly, J.H.; Shoup, M.J.; Smith, D.L.

    1989-01-01

    The authors discuss how they are designing an upgrade to its 24-beam OMEGA laser system, OMEGA is a frequency tripled, all-rod system capable of producing 2 kJ at 0.8 ns on target. Important direct-drive-target-ignition physics could be investigated with an upgraded system capable of producing a shaped pulse consisting of a long (5ns) low-intensity, foot, smoothly transitioning into a short (0.5 ns), intense, compression pulse. The total pulse energy is 30 kJ, which, from target-irradiation uniformity considerations, must be distributed over 60 beams

  15. Flexible trigger menu implementation on the Global Trigger for the CMS Level-1 trigger upgrade

    Science.gov (United States)

    MATSUSHITA, Takashi; CMS Collaboration

    2017-10-01

    The CMS experiment at the Large Hadron Collider (LHC) has continued to explore physics at the high-energy frontier in 2016. The integrated luminosity delivered by the LHC in 2016 was 41 fb-1 with a peak luminosity of 1.5 × 1034 cm-2s-1 and peak mean pile-up of about 50, all exceeding the initial estimations for 2016. The CMS experiment has upgraded its hardware-based Level-1 trigger system to maintain its performance for new physics searches and precision measurements at high luminosities. The Global Trigger is the final step of the CMS Level-1 trigger and implements a trigger menu, a set of selection requirements applied to the final list of objects from calorimeter and muon triggers, for reducing the 40 MHz collision rate to 100 kHz. The Global Trigger has been upgraded with state-of-the-art FPGA processors on Advanced Mezzanine Cards with optical links running at 10 GHz in a MicroTCA crate. The powerful processing resources of the upgraded system enable implementation of more algorithms at a time than previously possible, allowing CMS to be more flexible in how it handles the available trigger bandwidth. Algorithms for a trigger menu, including topological requirements on multi-objects, can be realised in the Global Trigger using the newly developed trigger menu specification grammar. Analysis-like trigger algorithms can be represented in an intuitive manner and the algorithms are translated to corresponding VHDL code blocks to build a firmware. The grammar can be extended in future as the needs arise. The experience of implementing trigger menus on the upgraded Global Trigger system will be presented.

  16. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  17. Silicon Sensors for the Upgrades of the CMS Pixel Detector

    CERN Document Server

    Centis Vignali, Matteo; Schleper, Peter

    2015-01-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accel- erator and its injection chain. Two major upgrades will take place in the next years. The rst upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2 10 34 cm-2 s-1 A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5 10 34 cm-2 s1. As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The rst upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout elec- tronics that allow ecient data taking up to a luminosity of 2 10 34 cm-2s-1,twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at dierent institutes. Ham...

  18. ETA-II accelerator upgrades

    International Nuclear Information System (INIS)

    Nilson, D.G.; Deadrick, F.J.; Hibbs, S.M.; Sampayan, S.E.; Petersen, D.E.

    1991-09-01

    We discuss recent improvements to the ETA-II linear induction electron accelerator. The accelerator's cells have been carefully reconditioned to raise the maximum accelerating gap voltage from approximately 100 kV to 125 kV. Insulators of Rexolite plastic in a new ''zero-gap'' arrangement replaced the alumina originals after several alternative materials were investigated. A new multi-cable current feed system will be used to eliminate pulse reflection interactions encountered in earlier experiments. Improved alignment fixtures have been installed to help minimize beam perturbation due to poorly aligned intercell magnets between 10-cell groups. A stretched wire alignment technique (SWAT) has been utilized to enhance overall magnetic alignment, and to characterize irreducible alignment errors. These changes are in conjunction with an expansion of the accelerator from a 20-cell to a 60-cell configuration. When completed, the upgraded accelerator is expected to deliver 2.5 kA of electron beam current at 7.5 MeV in bursts of up to fifty 70-ns pulses at a 5-kHz repetition rate. A 5.5-meter-long wiggler will convert the energy into 3-GW microwave pulses at 140 GHz for plasma heating experiments in the Microwave Tokamak Experiment (MTX)

  19. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  20. Estudio del comportamiento de un Control MPC [Control Predictivo Basado en el Modelo] comparado con un Control PID en una Planta de Temperatura

    Directory of Open Access Journals (Sweden)

    Emil Hernández-Arroyo

    2014-07-01

    Full Text Available Presenta un estudio comparativo entre el Control Predictivo basado en el Modelo [MPC] y el control PID, en una planta piloto de temperatura. Se encontró que el control MPC presenta mejor comportamiento, con un tiempo de asentamiento de 1000 segundos y una sobre-elongación de 5 °C, y que el PID presenta un tiempo de asentamiento de 2000 segundos y una sobre-elongación de 40 °C. Simultáneamente, se presenta una forma alternativa para controlar y monitorear en tiempo real la variable temperatura; para ello se dispone de un computador de escritorio que utiliza el software MATLAB 7.1 y la herramienta Real-Time Windows Target.

  1. Observing patchy reionization with future CMB polarization experiments

    Science.gov (United States)

    Roy, A.; Lapi, A.; Spergel, D.; Baccigalupi, C.

    2018-05-01

    We study the signal from patchy reionization in view of the future high accuracy polarization measurements of the Cosmic Microwave Background (CMB). We implement an extraction procedure of the patchy reionization signal analogous to CMB lensing. We evaluate the signal to noise ratio (SNR) for the future Stage IV (S4) CMB experiment. The signal has a broad peak centered on the degree angular scales, with a long tail at higher multipoles. The CMB S4 experiment can effectively constrain the properties of reionization by measuring the signal on degree scales. The signal amplitude depends on the properties of the structure determining the reionization morphology. We describe bubbles having radii distributed log-normally. The expected S/N is sensitive to the mean bubble radius: bar R=5 Mpc implies S/N ≈ 4, bar R=10 Mpc implies S/N ≈ 20. The spread of the radii distribution strongly affects the integrated SNR, that changes by a factor of 102 when σlnr goes from ln 2 to ln 3. Future CMB experiments will thus place important constraints on the physics of reionization.

  2. WNP-2 core model upgrade

    International Nuclear Information System (INIS)

    Golightly, C.E.; Ravindranath, T.K.; Belblidia, L.A.; O'Farrell, D.; Andersen, P.S.

    2006-01-01

    The paper describes the core model upgrade of the WNP-2 training simulator and the reasons for the upgrade. The core model as well as the interface with the rest of the simulator are briefly described . The paper also describes the procedure that will be used by WNP-2 to update the simulator core data after future core reloads. Results from the fully integrated simulator are presented. (author)

  3. Upgrades to the ATLAS trigger system   

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2017-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions wit...

  4. Comment on 'Calculated MPC values for Pu02 by comparing the added risk of cancer with the accepted occupational risks', by De Bont, A.H.; Beentjes, L.B., and reply

    International Nuclear Information System (INIS)

    Cohen, B.L.

    1980-01-01

    The article (Health Phys. 36, 53-58, 1979) adopts 10 -4 /yr as the 'accepted occupational risks'. Dr. Cohen criticises that value and its application to determination of MPC values for radioactivity for several reasons. The authors' reply states that their intention is not to exaggerate dangers, but that they believe that they have good reasons to suggest a reduction in the MPC for Pu0 2 . (author)

  5. The D0 upgrade

    International Nuclear Information System (INIS)

    Tuts, P.M.

    1992-10-01

    The original D0 detector was proposed in 1983, with a focus on high P T physics using precision measurements of e's, μ's, jets, and missing E T . This detector, as of the summer of 1992, has started data taking at the Fermilab Collider. However, by 1995/6 the luminosity will reach 10 31 cm -2 sec -1 , and the minimum bunch spacing will drop to 396ns from the present 3.5μs (by the Main Injector era, luminosities will approach 10 32 cm -2 sec -1 and minimum bunch spacings may reach 132ns). These changes in the accelerator conditions force us to upgrade or replace a number of detector subsystems in order to meet these new demands. In addition, the upgrade offers us the opportunity to expand the physics horizons to include not only the all important high P T physics menu, but also the low P T physics that has become increasingly important. In this paper we describe the D0 detector upgrade

  6. Instrumentation and control upgrade evaluation methodology: Final report. Volume 2: Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This workbook accompanies the methodology manual (EPRI TR-104963-V1) which describes how to develop an Upgrade Evaluation Report (UER). A UER is an evaluation that is performed by a nuclear power plant to decide the most cost-effective upgrade to perform (if any) for a previously identified Upgrade Candidate System. A UER defines the utility`s mission and objectives in regards to upgrade candidates, as well as the systems initial costs, benefits to each upgrade, and an initial upgrade schedule to cost-effectively implement system upgrades.

  7. Optimal Load-Tracking Operation of Grid-Connected Solid Oxide Fuel Cells through Set Point Scheduling and Combined L1-MPC Control

    Directory of Open Access Journals (Sweden)

    Siwei Han

    2018-03-01

    Full Text Available An optimal load-tracking operation strategy for a grid-connected tubular solid oxide fuel cell (SOFC is studied based on the steady-state analysis of the system thermodynamics and electrochemistry. Control of the SOFC is achieved by a two-level hierarchical control system. In the upper level, optimal setpoints of output voltage and the current corresponding to unit load demand is obtained through a nonlinear optimization by minimizing the SOFC’s internal power waste. In the lower level, a combined L1-MPC control strategy is designed to achieve fast set point tracking under system nonlinearities, while maintaining a constant fuel utilization factor. To prevent fuel starvation during the transient state resulting from the output power surging, a fuel flow constraint is imposed on the MPC with direct electron balance calculation. The proposed control schemes are testified on the grid-connected SOFC model.

  8. The hybrid MPC-MINLP algorithm for optimal operation of coal-fired power plants with solvent based post-combustion CO2 capture

    Directory of Open Access Journals (Sweden)

    Norhuda Abdul Manaf

    2017-03-01

    Full Text Available This paper presents an algorithm that combines model predictive control (MPC with MINLP optimization and demonstrates its application for coal-fired power plants retrofitted with solvent based post-combustion CO2 capture (PCC plant. The objective function of the optimization algorithm works at a primary level to maximize plant economic revenue while considering an optimal carbon capture profile. At a secondary level, the MPC algorithm is used to control the performance of the PCC plant. Two techno-economic scenarios based on fixed (capture rate is constant and flexible (capture rate is variable operation modes are developed using actual electricity prices (2011 with fixed carbon prices ($AUD 5, 25, 50/tonne-CO2 for 24 h periods. Results show that fixed operation mode can bring about a ratio of net operating revenue deficit at an average of 6% against the superior flexible operation mode.

  9. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  10. Upgrade to the Cryogenic Hydrogen Gas Target Monitoring System

    Science.gov (United States)

    Slater, Michael; Tribble, Robert

    2013-10-01

    The cryogenic hydrogen gas target at Texas A&M is a vital component for creating a secondary radioactive beam that is then used in experiments in the Momentum Achromat Recoil Spectrometer (MARS). A stable beam from the K500 superconducting cyclotron enters the gas cell and some incident particles are transmuted by a nuclear reaction into a radioactive beam, which are separated from the primary beam and used in MARS experiments. The pressure in the target chamber is monitored so that a predictable isotope production rate can be assured. A ``black box'' received the analog pressure data and sent RS232 serial data through an outdated serial connection to an outdated Visual Basic 6 (VB6) program, which plotted the chamber pressure continuously. The black box has been upgraded to an Arduino UNO microcontroller [Atmel Inc.], which can receive the pressure data and output via USB to a computer. It has been programmed to also accept temperature data for future upgrade. A new computer program, with updated capabilities, has been written in Python. The software can send email alerts, create audible alarms through the Arduino, and plot pressure and temperature. The program has been designed to better fit the needs of the users. Funded by DOE and NSF-REU Program.

  11. The new version of the LHCb SOL40-SCA core to drive front-end GBT-SCAs for the LHCb upgrade

    CERN Document Server

    Viana Barbosa, Joao Vitor; Gaspar, Clara

    2018-01-01

    The LHCb experiment is currently engaged in an upgrade effort that will implement a triggerless 40 MHz readout system. The upgraded Front-End Electronics profit from the GBT chipset functionalities and bidirectional optical fibers for readout, control and synchronization. This paper describes the new version of the firmware core that transmits slow control information from the Control System to thousands of Front-End chips and discusses the implementation that expedites and makes the operation more versatile. The detailed architecture, original interaction with the software control system and integration within the LHCb upgraded architecture are described.

  12. Sludge pasteurization and upgrading by radiation. Bilateral research cooperation between OAEP and JAERI

    International Nuclear Information System (INIS)

    1995-07-01

    The research cooperation between office of Atomic Energy for Peace, Thailand (OAEP) and Japan Atomic Energy Research Institute (JAERI) on 'Sludge Pasteurization and Upgrading by Radiation' was carried out for 4 years starting from March 1990. This cooperation was performed through information exchange meetings (Steering Committee Meeting), held in Takasaki and Bangkok, and experiments and discussions by scientist exchange, Many useful results were obtained on radiation inactivation effect of pathogen and parasites, upgrading of irradiated sludges to fertilizer, animal feeds and biological pesticides. This report includes the main results of the research cooperation reported at the First to Fifth Steering Committee Meetings as the progress reports. (author)

  13. Experiments on transient melting of tungsten by ELMs in ASDEX Upgrade

    Science.gov (United States)

    Krieger, K.; Balden, M.; Coenen, J. W.; Laggner, F.; Matthews, G. F.; Nille, D.; Rohde, V.; Sieglin, B.; Giannone, L.; Göths, B.; Herrmann, A.; de Marne, P.; Pitts, R. A.; Potzel, S.; Vondracek, P.; ASDEX-Upgrade Team; EUROfusion MST1 Team

    2018-02-01

    Repetitive melting of tungsten by power transients originating from edge localized modes (ELMs) has been studied in ASDEX Upgrade. Tungsten samples were exposed to H-mode discharges at the outer divertor target plate using the divertor manipulator II (DIM-II) system (Herrmann et al 2015 Fusion Eng. Des. 98-9 1496-9). Designed as near replicas of the geometries used also in separate experiments on the JET tokamak (Coenen et al 2015 J. Nucl. Mater. 463 78-84 Coenen et al 2015 Nucl. Fusion 55 023010; Matthews et al 2016 Phys. Scr. T167 7), the samples featured a misaligned leading edge and a sloped ridge respectively. Both structures protrude above the default target plate surface thus receiving an increased fraction of the parallel power flux. Transient melting by ELMs was induced by moving the outer strike point to the sample location. The temporal evolution of the measured current flow from the samples to vessel potential confirmed transient melting. Current magnitude and dependency from surface temperature provided strong evidence for thermionic electron emission as main origin of the replacement current driving the melt motion. The different melt patterns observed after exposures at the two sample geometries support the thermionic electron emission model used in the MEMOS melt motion code, which assumes a strong decrease of the thermionic net current at shallow magnetic field to surface angles (Pitts et al 2017 Nucl. Mater. Energy 12 60-74). Post exposure ex situ analysis of the retrieved samples show recrystallization of tungsten at the exposed surface areas to a depth of up to several mm. The melt layer transport to less exposed surface areas leads to ratcheting pile up of re-solidified debris with zonal growth extending from the already enlarged grains at the surface.

  14. Status of the U.S. Department of Energy (DOE) Government to Government Program in Russia

    International Nuclear Information System (INIS)

    Olascoaga, M.T.

    1996-01-01

    The US-Russian Government-to-Government Program of Cooperation on Nuclear Material Protection, Control, and Accounting (MPC ampersand A) evolved from the Nunn-Lugar Cooperative Threat Reduction Program. In 1995, the US Department of Energy (DOE) assumed responsibility as the executive agent for implementation of the Government-to-Government MPC ampersand A Program, followed by the programmatic responsibility for funding. The Russian Program initially emphasized limited exchanges, demonstrations, and upgrades at low-enriched uranium (LEU) fuel fabrication facility at Elektrostal in 1994. The program has expanded to include upgrades at nuclear facilities across Russia, development of the Russian Methodological Training Center (RMTC) in Obninsk; and cooperation with Gosatomnadzor, the Russian Federal Nuclear Radiation and Safety Authority. This paper describes the overall program including program objectives, approach, and US-Russian participation, with an emphasis on DOE-GAN cooperation

  15. Ion Cyclotron Resonant Heating 2 X 1700 loop antenna for the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Brooksby, C.A.; Ferguson, S.W.; Molvik, A.W.; Barter, J.

    1986-01-01

    This paper reviews the mechanical design and improvements that have taken place on the loop type ion cyclotron resonance heating (ICRH) antennas that are located in the center cell region of the Tandem Mirror Experiment-Upgrade (TMX-U). A computer code (JASON) was used to design getter-shielded antenna supports that will hold off very high voltages (83 kV, DC) over a small insulator distance (2.25 inches) in a vacuum of 10/sup -5/ Torr. The authors also added corona shields on the ceramic-to-metal joints of the matching network capacitors. The system now operates reliably with peak radio frequency (RF) voltages of 40 kV at 2-to-4- MHz frequency and power levels up to 200 kW. The authors have just installed a new loop antenna in the east part of the central cell where the slot antenna was located. This antenna uses two of the slot's internal coax lines and the external matching network. The feedthroughs designed by Lawrence Livermore National Laboratory (LLNL) were replaced with two high-voltage RF feedthroughs designed by Oak Ridge National Laboratory (ORNL)

  16. X-ray imaging studies of electron cyclotron microwave-heated plasmas in the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Failor, B.H.

    1986-02-01

    An x-ray pinhole camera designed to efficiently detect photons with energies between 5 and 250 keV was built to image bremsstrahlung emission from a microwave-heated hot electron plasma. This plasma is formed at one of the thermal barrier locations in the Tandem Experiment-Upgrade at Lawrence Livermore National Laboratory. The instrument consists of a lead aperture, an x-ray converter in the form of a sodium-activated cesium iodide scintillator, light intensifier electronics, and a recording medium that may either be high speed film or a CCD array. The nominal spatial and temporal resolutions are one part in 40 and 17 msec, respectively. The component requirements for optimum performance were determined both analytically and by computer simulation, and were verified experimentally. The details of these results are presented. The instrument has been used to measure x-ray emission from the TMX-U west end cell. Data acquired with the x-ray camera has allowed us to infer the temporal evolution of the mirror-trapped electron radial profile

  17. An x-ray detection system development for Tandem Mirror Experiment Upgrade (TMX-U): Hardware and software

    International Nuclear Information System (INIS)

    Jones, R.M.; Coutts, G.W.; Failor, B.H.

    1983-01-01

    This x-ray detection system measures the electron Bremstrahlung spectrum from the Tandem Mirror Experiment-Upgrade (TMX-U). From this spectrum, we can calculate the electron temperature. The low energy portion of the spectrum (0.5-40 keV) is measured by a liquid-nitrogen-cooled, lithium-drifted silicon detector. The higher energy spectrometer uses an intrinsic germanium detector to accommodate the 100 to 200 keV spectra. The system proceeds as follows. The preamplified detector signals are digitized by a high-speed A-to-D converter located in a Computer Automated Measurement and Control (CAMAC) crate. The data is then stored in a histogramming memory via a data router. The CAMAC crate interfaces with a local desktop computer or the main data acquisition computer that stores the data. The software sets up the modules, acquires the energy spectra (with sample times as short as 2 ms) and plots it. Up to 40 time-resolved spectra are available during one plasma cycle. The actual module configuration, CAMAC interfacing and software that runs the system are the subjects of this paper

  18. Full kinematic reconstruction of charged B mesons with the upgraded inner tracking system of the ALICE experiment

    Energy Technology Data Exchange (ETDEWEB)

    Stiller, Johannes Hendrik

    2016-05-11

    In this thesis, the performance of the full kinematic reconstruction of B{sup +} mesons in the decay channel B{sup +}→ anti D{sup 0}π{sup +}(anti D{sup 0}→K{sup +}π{sup -}) and charge conjugates for the 0-10% most central Pb-Pb collisions at √(s{sub NN})=5.5 TeV is demonstrated for the upgraded ALICE Experiment, which is planned before Run 3 of the Large Hadron Collider (LHC), beginning in 2020. Within the scope of the foreseen detector and readout upgrades to inspect all Pb-Pb collisions at their interaction rate of 50 kHz, in particular through the installation of a new high-granularity pixel inner tracker, for the first time these rare signals will become accessible using full kinematic reconstruction in central Pb-Pb collisions in ALICE at mid-rapidity at the LHC. Topological and kinematic criteria are used to select the beauty signal against the large combinatorial and correlated background. In addition to available full Monte Carlo (MC) simulations, a fast MC simulation, which includes parameterizations of all relevant detector effects, was developed and is now generally available for all rare probe studies with the upgraded ALICE detector. The fast simulation was used to improve the estimate on the residual combinatorial background in order to maximize the expected signal-to-background ratio and statistical significance. Within the uncertainties of the expected signal yield, a significant measurement (≥5) will be possible down to p{sub T} ≥ 2.0 GeV/c, corresponding to about 88% of the yield. The signal-to-background ratio lies between 0.01 and 4.0, increasing with p{sub T}. The required reference statistics in p+p collisions at √(s)=5.5 TeV was estimated to be about 100 pb{sup -1}. Considering the calculated expected statistics, the precision of the measurements of the nuclear modification factor R{sub AA} and the elliptic flow v{sub 2} were estimated. A measurement of the theoretically predicted R{sub AA} of 0.2-0.5 above p{sub T}≥5.0 Ge

  19. A Neutral Beam Injector Upgrade for NSTX

    International Nuclear Information System (INIS)

    Stevenson, T.; McCormack, B.; Loesser, G.D.; Kalish, M.; Ramakrishnan, S.; Grisham, L.; Edwards, J.; Cropper, M.; Rossi, G.; Halle, A. von; Williams, M.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current

  20. MHD equilibrium identification on ASDEX-Upgrade

    International Nuclear Information System (INIS)

    McCarthy, P.J.; Schneider, W.; Lakner, K.; Zehrfeld, H.P.; Buechl, K.; Gernhardt, J.; Gruber, O.; Kallenbach, A.; Lieder, G.; Wunderlich, R.

    1992-01-01

    A central activity accompanying the ASDEX-Upgrade experiment is the analysis of MHD equilibria. There are two different numerical methods available, both using magnetic measurements which reflect equilibrium states of the plasma. The first method proceeds via a function parameterization (FP) technique, which uses in-vessel magnetic measurements to calculate up to 66 equilibrium parameters. The second method applies an interpretative equilibrium code (DIVA) for a best fit to a different set of magnetic measurements. Cross-checks with the measured particle influxes from the inner heat shield and the divertor region and with visible camera images of the scrape-off layer are made. (author) 3 refs., 3 figs