WorldWideScience

Sample records for evaluation project iurep

  1. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Portugal

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Portugal. The IUREP Orientation Phase mission to Portugal estimates that the Speculative Resources of that country fall within the range 20,000 to 80,000 tonnes uranium. The majority of this potential is expected to be located in intergranitic vein deposits and in pre-Ordovician schists, but other favourable geological environments include episyenites and Meso-Cainozoic continental sediments. The mission recommends that approximately US$25 million be spent on exploration in Portugal over the next 10 years. The majority of this ($18 million) would be spent on drilling, with a further $7 million on surface surveys and airborne radiometric surveys. It is the opinion of the IUREP Orientation Phase Mission that the considerable funding required for the outlined programme would most suitably be realized by inviting national or foreign commercial organisations to participate in the exploration effort under a partnership or shared production arrangements. (author)

  2. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Turkey

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Turkey. The IUREP Orientation Phase mission to Turkey estimates that the Speculative Resources of that country fall within the range of 21 000 to 55 000 tonnes of uranium. This potential is expected to lie in areas of Neogene and possibly other Tertiary sediments, in particular in the areas of the Menderes Massif and Central Anatolia. The mission describes a proposed exploration programme with expenditures over a five year period of between $80 million and $110 million, with nearly half of the amount being spent on drilling. (author)

  3. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Burundi

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Burundi. The IUREP Orientation Phase Mission to Burundi estimates that the Speculative Resources of that country fall within the range of 300 to more than 4 100 tonnes of uranium. The potential is rather evenly distributed throughout the Proterozoic of Burundi in various geological environments (unconformity, hydrothermal, fault controlled, etc.). The mission recommends that over a period of five years U.S. $ 3 to 4.5 million be spent on exploration in Burundi, with even spending on the various exploration techniques as e.g. prospecting, drilling trenching, geophysical surveys, analyses, etc. (author)

  4. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Madagascar

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been made public which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Madagascar. The IUREP Orientation Phase Mission to Madagascar estimates the Speculative Resources of that country to be within the wide range of 4 000 to 38 000 tonnes uranium. Such resources could lie in areas with known occurrences (uranothorianite, Ft. Dauphin up to 5 000 t U, i.e. 'pegmatoids'; uranocircite, Antsirabe up to 3 000 t U in Neogene sediments; carnotiteautonite, Karoo area up to 30 000 t U in sandstones and in areas with as yet untested environments (e.g. related to unconformities and calcretes). Modifications to existing uranium exploration programmes are suggested and policy alternatives reviewed. No specific budget is proposed. (author)

  5. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Venezuela

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Venezuela. The IUREP Orientation Phase mission to Venezuela estimates that the Speculative Resources of that country fall within the range 2,000 to 42,000 tonnes uranium.- The majority of this potential is expected to be located in the Precambrian crystalline and sedimentary rocks of the Guayana Shield. Other potentially favorable geologic environments include Cretaceous phosphorite beds, continental sandstone and granitic rocks. The mission recommends that approximately US $18 million be spent on exploration in Venezuela over the next five years. The majority of this expenditure would be for surface surveys utilizing geologic studies, radiometric and geochemical surveys and some drilling for geologic information. Additional drilling would be required later to substantiate preliminary findings. (author)

  6. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Bolivia

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Bolivia. The IUREP Orientation Phase mission to Bolivia estimates that the Speculative Uranium Resources of that country fall within the range of 100 to 107 500 tonnes uranium. The majority of this potential is expected to be located in the Precambrian crystalline and sedimentary rocks of the southwestern part of the Central Brazilian Shield. Other potentially favourable geologic environments include Palaeozoic two mica granites and their metasedimentary hosts, Mesozoic granites and granodiorites as well as the intruded formations and finally Tertiary acid to intermediate volcanics. The mission recommends that approximately US$ 13 million be spent on exploration in Bolivia over a five-year period. The majority of this expenditure would be for airborne and surface exploration utilising geologic, magnetometric, radiometric, and geochemical methods and some pitting, trenching, tunneling and drilling to further evaluate the discovered occurrences. (author)

  7. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Rwanda

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Rwanda. The IUREP Orientation Phase Mission to Rwanda estimates that the Speculative Resources of that country fall within the range of 500 to 5 000 tonnes of uranium. The majority of this potential is expected to be located in the Precambrian Ruzizian, especially in conjunction with tectonized pegmatoidal remobilizations of metamorphic sediments of western Rwanda. Other favourable geological environments include lamprophyric dikes and post tectonic granites of central Rwanda. The Mission recommends that over a period of five years approximately US$4.2 million be spent on exploration in Rwanda. The majority of this would be spent on airborne and ground geophysical surveys ($1.5 million) and exploration drilling ($1 million). Prospecting, trenching and tunneling and analytical work would require the remainder of the $4.2 million ($1.7 million). (author)

  8. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Cameroon

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Cameroon. The IUREP Orientation Phase Mission to Cameroon estimates the Speculative Resources of that country to be in the order of 10 000 tonnes uranium for syenite-associated U-deposits in southern Cameroon, and in the order of 5 000 tonnes uranium for uranium deposits associated with albitized and desilicified late tectonic Panafrican granites (episyenite) and Paleozoic volcanics in northern Cameroon. No specific tonnage is given for Francevillian equivalents (DJA-Series) and for Mesozoic and Cenozoic sedimentary basins, which are thought to hold limited potential for sandstone hosted uranium. However the Douala basin, consisting of mixed marine and continental sequences merits some attention. No specific budget and programme for uranium exploration are proposed for Cameroon. Instead specific recommendations concerning specific potential environments and general recommendation concerning the methodology of exploration are made. (author)

  9. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Ghana

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) Mission to Ghana. The IUREP Orientation Phase Mission to Ghana estimates that the Speculative Resources of that country fall within the range of 15 000 to 40 000 tonnes of uranium. The majority of this potential is expected to be located in the Proterozoic Panafrican Mobile Belt (up to 17 000 tonnes uranium) and the Paleozoic Obosum Beds of the Voltaian basin (up to 15 000 tonnes uranium), the remainder being associated with various other geological environments. The mission recommends that over a period of three (3) years approximately U.S. $5 million) would be spent on exploration in Ghana. A major part of this (U.S $2 million) would be spent on an airborne spectrometer survey over the Voltaian basin (Obosum beds), much of the remainder being spent on ground surveys, trenching and percussion drilling. (author)

  10. Speculative resources of uranium. A review of International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983

    International Nuclear Information System (INIS)

    1983-01-01

    On a country by country basis the International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983 are reviewed. Information provided includes exploration work, airborne survey, radiometric survey, gamma-ray spectrometric survey, estimate of speculative resources, uranium occurrences, uranium deposits, uranium mineralization, agreements for uranium exploration, feasibilities studies, geological classification of resources, proposed revised resource range, production estimate of uranium

  11. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Zambia

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (IUREP) mission to Zambia. The IUREP Orientation Phase mission to Zambia estimates that the Speculative Resources of that country fall within the range of 33 000 and 100 000 tonnes uranium. The majority of these resources are believed to exist in the Karoo sediments. Other potentially favourable geological environments are the Precambrian Katanga sediments, as well as intrusive rocks of different chemical compositions and surficial duricrusts. Previous unofficial estimates of Zambia's Reasonably Assured Resources (RAR) and Estimated Additional Resources (EAR) are considered to be still valid: the total RAR amount to 6 000 tonnes uranium, located in Karoo (4 000 tonnes) and Katanga (2 000 tonnes) sediments, while the EAR are believed to total 4 000 tonnes being found only in Karoo sediments. The mission recommends that approximately US$ 40 million be spent on uranium exploration in Zambia over 10 years. The largest part of this expenditure would be for drilling, while the remainder should be spent on airborne and ground surveys, as well as on interpretative work on previous airborne data, Landsat imageries, etc. (author)

  12. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Bolivia. Draft

    International Nuclear Information System (INIS)

    Leroy, Jacques; Mueller-Kahle, Eberhard

    1982-08-01

    The uranium exploration done so far in Bolivia has been carried out by COBOEN, partly with IAEA support, and AGIP S.p.A. of Italy, which between 1974 and 1978 explored four areas in various parts of Bolivia under a production sharing contract with COBOEN. The basic objective of the International Uranium Resources Evaluation Project (IUREP) is to 'review the present body of knowledge pertinent to the existence of uranium resources, to review and evaluate the potential for discovery of additional uranium resources, and to suggest new exploitation efforts which might be carried out in promising areas in collaboration with the country concerned'. Following the initial bibliographic study which formed Phase I of IUREP, it was envisaged that a further assessment in cooperation with, and within, the country concerned would provide a better delineation of areas of high potential and a more reliable estimate as to the degree of favourability for the discovery of additional uranium resources. It was planned that such work would be accomplished through field missions to the country concerned and that these field missions and the resulting report would be known as the Orientation Phase of IUREP. The purpose of the Orientation Phase mission to Bolivia was a) to develop a better understanding of the uranium potential of the country, b) to make an estimate of the Speculative Resources of the country, c) to delineate areas favourable for the discovery of these uranium resources, d) to make recommendations as appropriate on the best methods for evaluating the favourable areas, operating procedures and estimated possible costs, e) to develop the logistical data required to carry out any possible further work, and f) to compile a report which would be immediately available to the Bolivian authorities. The mission reports contains information about a general introduction, non-uranium exploration and mining in Bolivia, manpower in exploration, geological review of Bolivia, past uranium

  13. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Morocco

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published on the findings of the mission to Morocco under the International Uranium Resources Evaluation Project (IUREP) Orientation Phase. The IUREP Orientation Phase Mission estimates that the speculative resources of Morocco range from 70 000 to 180 000 tonnes of uranium, half of which could be expected to occur in the Northern Provinces, which are relatively well explored, and the other half in the little explored Southern Provinces. In the north, speculative resources are fairly evenly distributed among the various types of deposit, in particular vein deposits (intragranitic and contact) linked with Hercynian and Precambrian blocks, the sandstone type deposits linked with Mesozoic strata and the volcanogenic deposits, especially of Precambrian age. The potential for large high-grade deposits, especially for those linked with unconformities and linear albitites, has been little investigated in Morocco and is chiefly thought to lie in the Precambrian in the Anti-Atlas and Southern Provinces. Here, the presence of acid volcanic rock reinforces the uranium potential, and there is also some potential for calcrete-related deposits. Phosphate-related uranium, to be recovered shortly, constitutes by far the largest reserves in Morocco, estimated at about 7 million tonnes of recoverable uranium. Recommendations have been made for further study of known occurrences and identification of new ones, such as unconformity and albitite-related deposits. (author) [fr

  14. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Morocco

    International Nuclear Information System (INIS)

    1985-01-01

    A report has recently been published on the findings of the mission to Morocco under the International Uranium Resources Evaluation Project (IUREP) Orientation Phase. The IUREP Orientation Phase Mission estimates that the speculative resources of Morocco range from 70 000 to 180 000 tonnes of uranium, half of which could be expected to occur in the Northern Provinces, which are relatively well explored, and the other half in the little explored Southern Provinces. In the north, speculative resources are fairly evenly distributed among the various types of deposit, in particular vein deposits (intragranitic and contact) linked with Hercynian and Precambrian blocks, the sandstone type deposits linked with Mesozoic strata and the volcanogenic deposits, especially of Precambrian age. The potential for large high-grade deposits, especially for those linked with unconformities and linear albitites, has been little investigated in Morocco and is chiefly thought to lie in the Precambrian in the Anti-Atlas and Southern Provinces. Here, the presence of acid volcanic rock reinforces the uranium potential, and there is also some potential for calcrete-related deposits. Phosphate-related uranium, to be recovered shortly, constitutes by far the largest reserves in Morocco, estimated at about 7 million tonnes of recoverable uranium. Recommendations have been made for further study of known occurrences and identification of new ones, such as unconformity and albitite-related deposits. (author)

  15. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Republic of Burundi. Draft

    International Nuclear Information System (INIS)

    Gehrisch, W.; Chaigne, M.

    1983-06-01

    The basic objective of the International Uranium Resources Evaluation project lUREP is to 'Review the present body of knowledge pertinent to the existence of uranium resources, to review and evaluate the potential for the discovery of additional uranium resources and to suggest new exploration efforts which might be carried out in promising areas in collaboration with the countries concerned'. Therefore, the scope of the IUREP orientation phase Mission to Burundi was to review all data on past exploration in Burundi, to develop a better understanding of the uranium potential of the country, to make an estimate of the speculative resources of the country, to make recommendation as appropriate on the best methods or techniques for evaluating the resources in the favourable areas and for estimating possible costs as well, to compile a report which could be immediately available to the Burundian authorities. This mission gives a general introduction, a geological review of Burundi, information on non-uranium mining in Burundi, the history of uranium exploration, occurrences of uranium IUREP mission field reconnaissance, favourable areas for speculative potential, the uranium resources position and recommendations for future exploration. Conclusions are the following. The IUREP Orientation -phase mission to Burundi believes that the Speculative Resources of that country fall b etween 300 and 4100 tons uranium oxide but a less speculative appraisal is more likely between 0 and 1000 tons. There has been no uranium production and no official estimates of Uranium Resources in Burundi. Past exploration mainly dating from 1969 onwards and led the UNDP Mineral project has indicated a limited number of uranium occurrences and anomalies. The speculative uranium resources are thought to be possibly associated with potential unconformity related vein-like deposits of the Lower Burundian. Other speculative uranium resources could be associated with granitic or peribatholitic

  16. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Uganda

    International Nuclear Information System (INIS)

    1985-01-01

    A full report has been compiled describing the findings of the International Uranium Resources Evaluation Project (IUREP) Orientation Phase Mission to Uganda. The Mission suggest that the speculative uranium resources of the country could be within the very wide range of 0 to 105 000 tonnes of uranium metal. The Mission finds that most of these speculative resources are related to Proterozoic unconformities and to Cenozoic sandstones of the Western Rift Valley. Some potential is also associated with Post-tectonic granites. The Mission recommends to rehabilitate the Geological Survey of Uganda in order to enable it to conduct and support a uranium exploration programme for unconformity related and for standstone hosted uranium deposits. Recommended exploration methods encompass geological mapping and compilation, an airborne gamma-ray spectrometer survey north of 1 deg. North latitude, stream sediment sampling, and ground scintillometric surveys in favourable areas. Follow up work should include VLF-EM surveys, emanometry and drilling. (author)

  17. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Colombia

    International Nuclear Information System (INIS)

    1984-01-01

    A full report has been released describing the findings of the International Uranium Resources Evaluation Project (IUREP) Orientation Phase Mission to Colombia. The Mission suggests that the speculative uranium resources of the country could be within the very wide range of 20 000 tonnes of 220 000 tonnes of uranium metal. The Mission finds that the area with the highest potential is the Llanos Orientales (Interior Zone), which has the potential of hosting quartz-pebble conglomerate deposits, Proterozoic unconformity-related deposits and sandstone deposits. The Mission recommends that approximately US$80 million should be expended in a phased ten-year exploration programme. It is likely that the majority of the funds will be needed for drilling, followed by ground surveys and airborne radiometry. It is the opinion of the Mission that the considerable funds required for the proposed programme could most suitably be raised by inviting national or foreign commercial organizations to participate under a shared production agreement. (author)

  18. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Somalia

    International Nuclear Information System (INIS)

    1985-01-01

    A full report has been compiled describing the findings of the International Uranium Resources Evaluation Project (IUREP) Orientation Phase Mission to Somalia. The Mission suggests that in addition to the reasonably assured resources (RAR) of 5 000 t uranium and estimated additional resources (EAR) of 11 000 t uranium in calcrete deposits, the speculative resources (SR) could be within the wide range of 0 - 150 000 t uranium. The majority of these speculative resources are related to sandstone and calcrete deposits. The potential for magmatic hydrothermal deposits is relatively small. The Mission recommends an exploration programme of about US$ 22 000 000 to test the uranium potential of the country which is thought to be excellent. The Mission also suggests a reorganization of the Somalia Geological Survey in order to improve its efficiency. Recommended methods include geological mapping, Landsat imagery interpretation, airborne and ground scintillometer surveys, and geochemistry. Follow-up radiometric surveys, exploration geophysics, mineralogical studies, trenching and drilling are proposed in favourable areas. (author)

  19. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Peru

    International Nuclear Information System (INIS)

    1984-01-01

    A report has recently been published which describes the findings of the International Uranium Resources Evaluation Project (TUREP) Mission to Peru. The IUREP Orientation Phase Mission to Peru estimates that the Speculative Resources of that country fall within the range of 6 000 to 11 000 tonnes uranium. The majority of this potential is expected to be located in Late Tertiary ignimbrites and associated sediments in the high Andes of southern Peru. Other favourable geological environments include calcretes, developed from Tertiary volcanogenic sources over the Precambrian in the Pacific Coastal desert in southern Peru, and Hercynian subvolcanic granites in the eastern Cordillera of southern Peru. The Mission recommends that over a period of five years approximately U.S. $10 million be spent on exploration in Peru. The majority of this would be spent on drilling ($5 million) and tunnelling ($2 million) with an additional $3 million on surface and airborne radiometric surveys. (author)

  20. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Ghana. Draft

    International Nuclear Information System (INIS)

    Guelpa, Jean-Paul; Vogel, Wolfram

    1982-12-01

    The Republic of Ghana has no claimed uranium resources in the categories Reasonably Assured and Estimated Additional. The only occurrences known are within pegmatites and are of no economic importance. The IUREP Orientation Phase Mission to Ghana estimates that the Speculative Resources of the country fall between 15,000 and 40,000 tonnes uranium. The IUREP Orientation Phase Mission to Ghana believes that the Panafrican Mobile Belt has the highest uranium potential of all geological units of the country. The Obosum beds are the priority number two target. A three years exploration programme is recommended for a total cost of US $ 5,000,000. The Ghana Atomic Energy Commission and the Ghana Geological Survey provide a basic infrastructure for uranium exploration. Any future uranium development in Ghana should be embedded in a well defined national uranium policy. It is recommended that such a policy be draw, up by the Ghanaian authorities

  1. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Morocco. Draft

    International Nuclear Information System (INIS)

    Aniel, Mlle B.; Hetland, Donald L.; Glassom, Pierre J.

    1983-07-01

    The results of the study carried out during the IUREP Orientation Phase in Morocco permit to think that the possible reserves of uranium in this country range between 33,500 t and 89,500 t U 3 O 8 for what concerns the known traces and the already prospected zones in the Northern provinces. If we consider the favourability criteria of certain geological contexts that have not been researched yet in the same provinces and the speculative potential of the Southern provinces that have not been prospected at all, we can reasonably estimate reserves to double. In this case, the potential in uranium for the whole Morocco could range between 70,000 and 180,000 tons. The uranium phosphate constitutes by far the most important reserves of Morocco and the Moroccan government has decided to recuperate this uranium as sub-product from phosphoric acid. The consultants of the IUREP mission have estimated that the 'geological reserves' were ranging at about 12,3 million tons of U 3 O 8 and that the recoverable reserves could be between 7 and 10 million tons of U 3 O 8

  2. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Colombia. February - March 1980

    International Nuclear Information System (INIS)

    Cameron, J.; Meunier, A.R.; Tauchid, M.

    1980-01-01

    The basic objective of IUREP is to 'review the present body of knowledge pertinent to the existence of uranium resources, to review and evaluate the potential for discovery of additional uranium resources, and to suggest new exploration efforts which might be carried out in promising new areas in collaboration with the countries concerned'. Following the initial bibliographic study, which formed Phase I of IUREP, it was envisaged that a further assessment in co-operation with the country in question would lead to a better delineation of areas of high potential and a more reliable estimate as to the degree of favourability for the discovery of additional uranium resources. It was planned that such work would be accomplished through field missions to the country and that these field missions and the resulting report would constitute the IUREP Orientation Phase. The purpose of the Orientation Mission to Colombia was (i) to develop a better understanding of the uranium potential of the country, (ii) to delineate areas favourable for the discovery of speculative uranium resources, (iii) to make recommendations, as appropriate, on the best methods for evaluating the favourable areas, operating procedures and estimated possible costs, (iv) to develop the logistical data required to carry out any possible further work, and (v) to compile a report that would be immediately available to the Colombian authorities. Uranium exploration in Colombia is of very recent date, with the majority of activities getting under way only after 1970. In spite of the limited work that has been done, however, over 1300 radioactive anomalies have been recorded. The total number of uranium mineral occurrences resulting from follow-up work is still very small, and some are unusual in world terms. Topographic and geographic conditions in Colombia make geological and exploration work very difficult and costly, especially in the Cordilleras and the Interior Zone (Llanos Orientales). There are, at

  3. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Sudan. February-March 1981

    International Nuclear Information System (INIS)

    Kneupper, G.; Scivetti, N.

    1981-01-01

    The IUREP Orientation Phase Mission to the Democratic Republic of the Sudan believes that the Speculative Resources of the country might fall between 20,000 and 40,000 tonnes uranium and more. This indicates that the Speculative Resources of the Sudan could be significantly higher than previously estimated (7,500 tonnes uranium) by the NEA/IAEA Steering Group on the Uranium Resources - IUREP Phase I. The Government is willing to consider valid exploration programmes presented by prospective partners as long as they serve the interests of both parties. Within the general six-year (1977/78-1982/83) plan for development of the country's mineral resources, the Ministry of Energy and Mining has set up certain priorities which it would like to see expeditiously implemented: uranium exploration and production stands high on the list of priorities. On the basis of very limited information on regional geology and on previous exploration which was available to the Mission, it is estimated that the greatest potential for the Speculative Resources of possible economic significance will prove to occur in the following geological environments of the Sudan (Red Sea Hills area is not included): precambrian basement complex, palaeozoic-mesozoic-tertiary sedimentary basins and the tertiary to recent calcretes. The IUREP Orientation Phase Mission believes that some 20 Million US$ (very rough estimate) will be needed to (1) check the validity of the basic geological concepts formulated on the uranium potential of the selected areas, (2) accumulate diagnostic geological, geophysical, geochemical data indicative of a true uranium potential there, (3) study the basement complex rocks and the sedimentary formations at least on a broad structural-stratigraphic reconnaissance basis (a tremendous amount of valuable water drilling data has accumulated over the last years for some of the selected sedimentary basins) and (4) determine the most appropriate investigation techniques to be utilized

  4. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Somalia

    International Nuclear Information System (INIS)

    Levich, Robert A.; Muller-Kahle, Eberhard

    1983-04-01

    The IUREP Orientation Phase Mission to Somalia suggests that in addition to the reasonably assured resources (RAR) of 5 000 t uranium and estimated additional resources (EAR) of 11 000 t uranium in calcrete deposits, the speculative resources (SR) could be within the wide range of 0 - 150 000 t uranium. The majority of these speculative resources are related to sandstone and calcrete deposits. The potential for magmatic hydrothermal deposits is relatively small. The Mission recommends an exploration programme of about US $ 22 000 000 to test the uranium potential of the country which is thought to be excellent. The Mission also suggests a reorganization of the Somalia Geological Survey in order to improve its efficiency. Recommended methods include geological mapping, Landsat Imagery Interpretation, airborne and ground scintillometer surveys, and geochemistry. Follow-up radiometric surveys, exploration geophysics, mineralogical studies, trenching and drilling are proposed in favourable areas

  5. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Turkey. September to November 1980

    International Nuclear Information System (INIS)

    Ziehr, H.; Komura, A.

    1985-02-01

    The IUREP Orientation Phase Mission to Turkey estimates the Speculative Resources of the country to lie between 21 000 and 55 000 tonnes uranium. Past exploration in Turkey, dating from 1953, has indicated a very high number of uranium occurrences and radioactive anomalies, but ore deposits of significant size and grade have not been found. Present reserves amount to 4 600 tonnes uranium which can be allocated to approximately 15 sandstone type deposits in Neogene continental sediments. Several hundreds of other occurrences and radioactive anomalies exist where ore reserves have not been delineated. The uranium occurrences and radioactive anomalies can be divided according to host rock into (a) crystalline massif and (b) Tertiary continental sediment. The greatest geological potential for further resources is estimated to exist in the above mentioned two geological terrains. The most favourable geological potential exists in Neogene continental sedimentary basins near the crystalline massifs. Because surface exploration in the known favourable areas such as the Koepruebasi Basin has been so systematic, extensive, and successful, it is improbable that additional surface work will have much effect in increasing the number of new radioactive anomalies or uranium occurrences detected at the surface in these areas. Surface survey work in these areas should be mainly designed to assist the understanding of structures at depth. Surface reconnaissance survey work is, however, required in other parts of the above mentioned two geological terrains in this country. Before starting such a reconnaissance survey in new areas, the Mission suggests that a careful and extensive library study be conducted in close co-operation with sedimentologists, petrologists, and remote sensing specialists. The Mission suggests that in the medium term, 8 to 10 years, some 85 - 110 million U.S. Dollars be spent on airborne and ground surveys, including geological, radiometric, geochemical, and

  6. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Greece

    International Nuclear Information System (INIS)

    1977-10-01

    Greece, with an area of 131,944 km 2 , has been actively explored since 1971 under a programme of co-operation with UNDP and IAEA on which close to US $1 million have been spent so far. The programme is focused on the Rhodope Precambrian massif, which is the most attractive structural unit from the geological point of view. The indications available at present, and which have been known for a long time, are also to be found in this unit. They are associated either with Tertiary continental volcanism or with detritic sediments in basins covering this massif. So far there is no evidence of their being of any economic value. The paucity of data available on the basement of the Rhodope precludes any prediction as to the possibility of its containing Pre-cambrian uranium mineralizations. One might perhaps think in terms of mineralizations of the alaskite or alkaline complex type, or also of vein-type deposits. But it is primarily in the deposits associated with tertiary trachy-rhyolitic volcanism that we have most confidence, especially in the Rhodope massif and the Vardar region but possibly elsewhere in the Hellenides as well. All things considered, we place Greece in Group 2 of the IUREP classification. (author)

  7. International Uranium Resources Evaluation Project (IUREP) national favourability studies: United Kingdom

    International Nuclear Information System (INIS)

    1977-10-01

    Although uranium prospecting was commenced in the United Kingdom (area 244,813 km) at the end of the last century and was resumed just after the Second World War, it does not seem, for various reasons, despite the level of competence of its specialists and the level of instrumentation available, that the country has been adequately prospected for uranium. The small reserves discovered to date, some 7400t U for all the official NEA/lAEA categories, probably do not reflect the true uranium potential of the United Kingdom. However, they do indicate without doubt that the resources remaining to be discovered are so located that detection will be difficult. The most promising areas of investigation in our opinion are the Old Red Sandstones of the Devonian period on the one hand and the districts where the uraniferous black shales of the Cambro-Ordovician and Namurian have suffered perturbations which may have led to immobilization of their uranium content (in particular, granitizations). All the considerations put forward in this analysis lead us to place the United Kingdom in category 4 of the classification adopted for IUREP. (author)

  8. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Republic of Korea

    International Nuclear Information System (INIS)

    1977-12-01

    The Republic of Korea, occupies the southern end of the Korean peninsula. It has a long history of mining and mineral production, and has an active and fairly well equipped Geological Survey. The country in general is quite highly mineralized with many minerals including uranium although there has been no uranium production from it yet. Uranium occurs in granites, schists, and in black carbonaceous shales. The Korean Geological survey has estimated that one ore body contains 650 tonnes U in 1,600,000 tons of ore at an average grade of 0.047 percent U 3 O 8 . Many recent reports also indicate very large resources of uranium in very low grade ranges. The uranium potential for the Republic of Korea is considered in Category 2 (1,000 - 10,000 tonnes U) in the normal IUREP context. However, a very large resource may exist in the very low grades in black shales of the country. This resource is considered as in category 6 (500,000 to 1,000,000 tonnes U). (author)

  9. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Peru. August - October 1981

    International Nuclear Information System (INIS)

    Hetland, Donald L.; Michie, Uisdean McL.

    1981-01-01

    cored drilling in assessment areas. Ground surveys should involve basin mapping geophysics, soil .and rock geochemistry, volcanic faces mapping and regional radon surveys. Airborne surveys should be initially helicopter-mounted total count surveys and only later spectrometric surveys. The IUREP Orientation Mission suggests that over a period of five years, some ten million US dollars be spent on surface and sub-surface exploration. Closer liaison, perhaps even joint project teams, should be initiated with the general state mapping and minerals organisation INGEMMET. This would serve to broaden significantly the geologic background and expertise in the search for uranium. In the event that private companies, local and/or foreign, are invited to participate in the exploration for uranium in Peru, it is recommended that no areas should be reserved solely to government exploration and assessment. All districts should be open to private companies' participation. This could be either joint ventures in chosen areas or merely IPEN supervision of activities and collection of data

  10. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Madagascar. September-October 1981

    International Nuclear Information System (INIS)

    Meyer, John H.; Brinck, Johan W.

    1981-01-01

    This study, resulting from the IUREP Orientation Mission to Madagascar, includes the reported information on infrastructure, mining regulations and conditions made available to the Mission. Within the structure of the centrally planned economic system, uranium exploration and mining is considered the exclusive activity of OMNIS, an organization founded by the State for that purpose (Office Militaire National pour les Industries Strategiques). Madagascar has a long history of prospection and small-scale exploitation of uranium (thorium and radium). Some of this activity dates back to 1909, culminating in significant production of both uranium and thorium (in excess of 5900 tonnes of uranothorianite) by the CEA and private contractors in the Fort Dauphin area from 1955 to 1968. Past exploration and development work in a number of areas, notably by the CEA, OMNIS and the IAEA/UNDP, is reviewed and the uranium resources and mineral indications reported. The areas rated at present as the more important and which continue to be investigated (by OMNIS, in conjunction with IAEA/UNDP projects) in the order of priority are: the Fort Dauphin area, the Karroo formation and the Neogene lacustrine basin at Antsirabe. The Mission estimates that Madagascar has a moderate potential for undiscovered resources; it is estimated that such speculative resources could lie within the range of 4000 - 38000 tonnes U. In addition there are areas with as yet untested environments and with no known occurrences which may be favourable but which will require prospection. Modifications to existing programmes and new programmes are suggested. Policy alternatives are reviewed

  11. International Uranium Resources Evaluation Project (IUREP) national favourability studies: The Netherlands

    International Nuclear Information System (INIS)

    1978-01-01

    The Netherlands is part of the lowlands of Western Europe formed by negative crustal movements that have been offset by sedimentation. This specific area stretching from western Belgium into north-western Germany forms part of an epicontinental area that has been relatively stable since the end of the Hercynian orogeny. In Holland the subsidence has generally been small through- out the Mesozonic and Cenozoic though interrupted by short periods of erosion and non-subsidence. Thus the general geology of the Netherlands is dominated by the fact that throughout the Tertiary and Quaternary what now comprises the Netherlands formed part of a subsiding basin. Most of the surface geology of the country is dominated by f luvio-glacial shallow marine and lacoustine deposits. Prospecting for radioactive minerals in the Netherlands has been very limited. Some work has been carried out by the Geological Survey and by private consultants but this was very preliminary. To-date no uranium reserves or resources have been identified in the Netherlands. One small uranium occurrence has been recorded in Zeeland near Walcheren where some small uranium concentrations were found in association with phosphatic nodules. Apart from very limited targets in the Cretaceous and small phosphatic uranium associations there are no apparent uranium exploration targets in the Netherlands. On this basis we would, at this time, place the uranium potential of the Netherlands in Group I of the IUREP classification

  12. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Spain

    International Nuclear Information System (INIS)

    1977-10-01

    category No, 4 if not in No, 5 of the IUREP classification. (author)

  13. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Cameroon. Draft

    International Nuclear Information System (INIS)

    Trey, Michel de; Leney, George W.

    1983-05-01

    The purpose of the International Uranium Resource Evaluation Project (IUREP) missions to host nations is to: R eview the present body of knowledge pertinent to the existence of uranium resources, to review and evaluate the potential for the discovery of additional resources, and to suggest new exploration efforts which might be carried out in promising areas in collaboration with the countries concerned. Guidance in the achievement of these goals is provided through a check list of desired relevant information on: general background, the potential role of nuclear energy, and organizations involved, information on the mining industry, technical manpower employed or available, available maps, aerial photographs, and publications, national geological survey and organizations involved in uranium, private organizations involved in uranium exploration and mining, results of previous exploration, known uranium occurrences, plans for further work, legal and administrative requirements for exploration and logistical information on facilities available. The economy of CAMEROON is sound and continues to expand with an annual growth rates of 5-6%. Emphasis is placed on private investment with government participation in major development projects. The overall investment climate is good. Minerals exploration is carried out under nonexclusive Prospecting License and exclusive Exploration License that may later be converted to a Mining Lease or Mining Concession. Many of the conditions must be negotiated. Uranium is classified as a strategic mineral, and may be subject to special review. There is no defined policy on uranium development. Two government organizations are concerned with geology and mining. The INSTITUT DE RECHERCHES GEOLOGIQUES ET MINIERES (IRGM) conducts programs of geologic mapping and research, mineralogy, hydrology, and alternate energy sources. The DEPARTMENT OF MINES AND GEOLOGY (DMG) is responsible for all minerals exploration and mining. It includes a

  14. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Venezuela. Draft

    International Nuclear Information System (INIS)

    Hetland, Donald L.; Obellianne, Jean-marie

    1981-04-01

    The IUREP Orientation Phase Mission to Venezuela believes that the Speculative Uranium Resources of that country fall between 2,000 and 42,000 tonnes. This assumes that a part of the Speculative Resources would be extracted as by-product uranium from wet-process phosphoric acid production. Past exploration in Venezuela has resulted in the discovery of very few uranium occurrences and radioactive anomalies except for the many airborne anomalies recorded on the Guayana Shield. To date no economic deposits or significant uranium occurrences have been found in Venezuela except for the uraniferous phosphorites in the Cretaceous Navey Formation which are very low grade. The uranium occurrences and radioactive anomalies can be divided according to host rock into: (1) Precambrian crystalline and sedimentary rocks, (2) Cretaceous phosphorite beds, (3) continental sandstone, and (4) granitic rocks. The greatest geological potential for further uranium resources is believed to exist in the crystalline and sedimentary Precambrian rocks of the Guayana Shield, but favorable geological potential also exist in younger continental sandstones. Since the Guayana Shield is the most promising for the discovery of economic uranium deposits most of the proposed exploration effort is directed toward that area. Considerable time, effort and capital will be required however, because of the severe logistical problems of exploration in this vast, rugged and inaccessable area, Meager exploration work done to date has been relatively negative suggesting the area is more of a thorium rather than a uranium province. However because of the possibility of several types of uranium deposits and because so little exploration work has been done, the Mission assigned a relatively small speculative potential to the area, i.e. 0 to 25,000 tonnes uranium. A small speculative potential (0 to 2,000 tonnes) was assigned to the El Baul area in Cojedes State, in the Llanos Province. This potential is postulated

  15. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Thailand. February-March 1981

    International Nuclear Information System (INIS)

    Inazumi, Satoru; Meyer, John H.

    1981-01-01

    The I.U.R.E.P. Orientation Phase Mission assesses the Speculative Uranium Resources in Thailand to be within the range of 1,500 to 38,500 tonnes U. This range is higher than the previous assessment in Phase I because the Mission recognizes additional favourable geological environments. At the same time, the untested and therefore the unknown degree of mineralization in some of these environments is acknowledged. Past exploration, dating from 1977, has been mainly confined to ground surveys of a small mineralized area and to airborne gamma-ray surveys of two small test areas. Ground reconnaissance work and prospecting has recognized some mineralization in several different host rocks and environments. Geological environments considered by the Mission to be favourable for uranium occurrences include sandstone of Jurassic to Triassic age, tertiary sedimentary basins (northern Thailand), tertiary sedimentary basins (southern Thailand), associated with fluorite deposits, granitic rocks, black shales and graphitic slates of the Paleozoic, associated with sedimentary phosphate deposits and associated with monazite sands. It is recommended that exploration for uranium resources in Thailand should continue. Planners of future exploration programmes should take the following activities into consideration. Rapid extension of carborne surveys to cover, without excessive overburdening, all areas having sufficient road density. Airborne gamma-ray surveys should be carried out in certain selected areas. In the selection of such areas, the considerable higher cost factor attendant on this method of surveying dictates that airborne surveys should only be carried out where carborne surveys prove ineffective (lack of adequate road network.) and where the topography is sufficiently even to assure a low but safe clearance and meaningful results. In certain areas, including the Khorat Plateau and the Tertiary Basins in northern and southern Thailand, there is a need for widely spaced

  16. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Bangladesh

    International Nuclear Information System (INIS)

    1978-01-01

    With the exception of the exploration activities in relation with the Beach Sand Project along the eastern Bay of Bengal, no systematic exploration for uranium had been done before December 1976, when a radiometric survey was implemented by the IAEA. As a result of this survey high radioactivity up to 450 cps was detected in placer Tipam deposits, The background of the terrain made up by Tertiary sediments is 160 - 170 cps. An anomaly was found in Kalipur Chara area which coincides with concentration of heavy minerals derived from Tipam Sandstones. Another anomaly was found within a horizon of Tipam sandstone crossing Hari River. An isolated outcrop in the riverbed showed a count rate up to 4 times background. During the follow up work it was found that this steeply dipping mineralized band stretches (with interruptions) over a distance of at least 3km along a strike. Samples collected from three different spils showed concentration of uranium 50, 60 and 140 ppm. The mineralized bed varies in thickness from a few cm to 2 m. It consists of alternating altered and unaltered sandstone. Bangladesh and Australian experts have separated monazite, zircon, ilmenite, rutile and magnetite from local sands at Cox's Bazar, 96 km southeast of Dacca. Radioactive mineral content is around 3,1% and exploitation may be feasible. Concerning the present status of exploration the technical assistance mission of the IAEA in the field of uranium exploration in Bangladesh is continuing with the objective to evaluate uranium potential in Chittongong and Sylhet district. Concerning areas favourable for uranium first priority should be given to areas of Hari River and Kalipur Chara where radioactive anomalies were detected. In general the area covered by Tipam Sandstone appears to be favourable for uranium mineralization. The potential for new discoveries in Bangladesh appears to be not too bad. Speculative potential could be in the order of 1-10,000 tons uranium

  17. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Guatemala

    International Nuclear Information System (INIS)

    1977-08-01

    Before 1959 a private individual (Mr. Rene Abularach) is reported to have made an airborne radiometric survey of the Sierra de las Minas and Sierra Madre Ranges. Although many anomalies were detected by this survey, none were verified in the ground survey followup, despite apparently adequate flight control. In 1968 a United Nations Special Fund Mineral Survey Project completed over 1,000 km of carborne radiometric survey with geiger counter readings at 500 m intervals. No anomalies were detected, but background radioactivity for several formations and geologic environments was established. In 1969 the Guatemalan government solicited the IAEA for technical assistance In conducting a preliminary uranium favorability study designed to formulate recommendations for a national radioactive ore prospecting program. A carborne radiometric survey was made of environments theoretically favorable for uranium deposition, with spot geological and radiometric examinations being .conducted in the more favorable areas. All Important mining regions of Guatemala except the leterites and the ultrabasics were visited. No evidence of a uranium province was observed 1n these field investigations and the recommendation was made that the government not embark on a more detailed national prospecting program at that time. At the time of completion of the IAEA-Guatemalan government (GOG) reconnaissance program in 1971, no uranium reserves or resources were known. More recent information on uranium occurrences and resources 1n Guatemala does not appear to be available. Information on more recent uranium reconnaissance than that undertaken during 1971 IAEA-GOG study is lacking. However, in more recent years the country's mineral potential has been generally evaluated with the aid of the UN and ICAITI (Central American Research Institute for Industry). Except for quarry materials, the state owns all minerals. The state has priority on purchase of any mineral production needed for the country

  18. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Bolivia

    International Nuclear Information System (INIS)

    1977-08-01

    Bolivia has an area of 1,098,580 square kilometers. Its capital is La Paz. The western part of the country is dominated by two ranges of the Andes Mountains, the Cordillera Occidental on the vest flank of the high plateau (Altiplano) and the Cordillera Real (or Oriental) on the east flank. The northern Andes average 5,486 meters in elevation; the southern Andes are not as lofty. The Altiplano is 3,658 to A,267 meters high and 129 km. in average width; it is the largest basin of inland drainage in South America and contains the renowned Lake Titicaca on the Peruvian-Bolivian border. The eastern tropical lowlands or pampas (Oriente) comprise about two-thirds of the country, with rain forest in the northern portion. An intermediate zone of valleys and basins lies between the eastern Andes and Oriente. Bolivia differs from other Andean countries, like Chile, Peru and Ecuador, in having large areas of Preeambrian schists, gneisses, migmatites and granites. These crop out in the eastern part of the country. Parts of these rocks contain banded iron formations (i.e., in the Muttin region) and are probably early Precambrian in age. Little systematic exploration for uranium was undertaken in Bolivia until the late 1960's. In 1967, 1968 and 1969 technical assistance was requested from, and provided by, the IAEA. This work led to evaluation of radioactive anomalies in veins of northeast Bolivia and in sandstones in the extreme southern part of the country. Although no uranium reserves are now credited to Bolivia, the geologic possibilities for several kinds of uranium deposits coupled with the relatively limited work done to date suggest that uranium orebodies will be discovered. It is estimated that the potential resources of Bolivia are in the range of 10,000 to 100,000 tonnes uranium

  19. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Austria

    International Nuclear Information System (INIS)

    1977-10-01

    The Federal Republic of Austria is situated in the southeastern part of Central Europe. The country covers a total area of 83.350 square kilometers, the population amounts to 7.5 million inhabitants. The geographical features of Austria are dominated by the E-W-trending chain of the Alps (approximately 60% of the country). The northeastern part of the country is formed by the nonalpine mountains and hills of the Bohemian Massif. There are a large depression, the basin of Vienna, as well as parts of the Pannonian basin in the eastern part. The main hydrographic features are characterized by the river Danube and its tributaries. With the exception of a small part in the west of the country, the drainage system of which is directed to the river Rhine, all other rivers are drained by the Danube. The elevations in the Alps reach heights of up to 3 800 m. Many of the E-W striking mountain chains are higher than 2000 to 2500 m. Several major N-S trending passes over the mountains are favourable for the transportation systems (railroads, motorroads) - The kind of land use in Austria is mainly determined by the character of the landscape which is made up of mountains and valleys as well as of depressions in the eastern part of the country. In the lowlands, good farmland is available. At lower and at medium elevations, forests and grassland predominate in the Alps. At higher elevations, the Alps are covered with grasslands; a great part of the rocks has no soil cover, another part is covered by perennial snow and ice.The presence of many uranium occurrences in the Permo-Triassic sediments justifies a detailed survey of these strata. Special studies on the lithology and the formation of uranium in these rocks have been made during the last few years. They should be evaluated to point out new favourable prospective areas. The potential of Uranium which is assumed to be found in Austria is 10,000 - 50,000 t U

  20. International Uranium Resources Evaluation Project (IUREP) national favourability studies: El Salvador

    International Nuclear Information System (INIS)

    1977-08-01

    No information is available on past uranium exploration in El Salvador. The foetallogenic map of Central America (ICAITI, 1970) shows no uranium occurrences, and no descriptions of occurrences are available for this study. Information on current uranium exploration in El Salvador is not available. The 1922 mining code, as amended, covers all minerals, with special rules applicable to phosphates, petroleum and other hydrocarbons. The state owns all minerals, including phosphates, except for salt and other common materials. Mineral and surface rights are distinct. Both citizens and aliens may acquire mineral rights. There is a possibility of uranium potential in the clastic sediments containing interbedded volcanics, particularly where the latter are tuffaceous. These rocks occur chiefly in the north western part of the country and are of limited areal extent. The possibility of uranium occurrences associated with acid volcanics cannot be discounted, but it is difficult to evaluate rocks of this type for uranium with the present state of knowledge. Accordingly, potential resources are estimated at between 0 and 1,000 tonnes uranium

  1. International Uranium Resources Evaluation Project (IUREP) national favourability studies: United States of America

    International Nuclear Information System (INIS)

    1977-08-01

    . Industry surveys indicated that 10.3 Billion meters were drilled during 1976 at an estimated cost of $156.9 million. For 1977 plans are projected at 11.4 million meters at a cost of $167.8 million. Costs include land acquisition, geological and geophysical surveys, site preparation, logging, end site restoral. The uranium potential of the U.S.A. is estimated to be well in excess of 1,000,000 tonnes

  2. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Panama

    International Nuclear Information System (INIS)

    1977-08-01

    About 20 percent of Panama has been covered by airborne radiometric surveys, largely in the Azuero-Petaquilia area. Essentially no ground examinations have been made. About one third of the country remains unmapped. Most of the rest has been examined only in rapid reconnaissance largely by the United Nations and oil companies. Detailed mapping has been confined to the Canal Zone. No uranium deposits or prospects of economic interest are known in Panama. There appears to be no information available on present exploration activities for uranium. Panama has no specific legislation relating to nuclear energy. However, all mineral deposits belong to the state, except for salt and similar materials, and are governed by the mineral resources code. There appears to be only one remote possibility for uranium mineralization in Panama, namely, sandstone-type deposits. Marginal marine and fluvial sediments, such as host sandstone-type deposits elsewhere, are most abundant 1n the lower Cenozoic parts of the Azuero and possibly Bocas del Toro basins and are probably absent or poorly developed in the Darien and Central basin. Rocks with even moderate background uranium concentrations to be leached and deposited in such sediments are confined to the silicic and alkaline Intrusive rocks of the La Yeguada Formation 1n western Panama and possibly the Rio Guayabo stock in the Sierra de Maje of eastern Panama. Only the La Yeguada Formation is extensive enough and near enough to a potential sedimentary ore host to be important. Uranium concentrations have not been measured in this unit but its silicic composition, relatively young age (with respect to other volcanic rocks in Panama) and high ash content suggest that it may have relatively high Teachable uranium content. The best areas for exploration for La Yeguada-derived sandstone-type uranium deposits would be in the Pese formation between Santiago and Chitre in the Azuero basin. Possibly favourable sandstone type exploration ground could extend into the Oligocene deposits of the David and Bocas del Toro basins. The possibilities for uranium in Panama are not favourable and the potential is estimated at less than 1,000 tonnes uranium

  3. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Brunei

    International Nuclear Information System (INIS)

    1978-02-01

    Brunei is a very small country consisting of only 5,800 sq km, and with only 150,000 people. Its main mineral products are crude oil and natural gas. It is hot and humid throughout the year being located only 4 degrees north of the equator on the island of Borneo. The sultanate of Brunei contains very thick sediments, some of which probably have the characteristics of a good uranium host rock for sandstone type deposits, but tacking a classic source, the uranium potential is minimal. Potential for other types of uranium deposits is likewise considered minimal. Therefore Brunei is assigned a potential in category 1 (less than 1000 tonnes U). (author)

  4. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Laos

    International Nuclear Information System (INIS)

    1977-11-01

    Laos is a land locked country containing about 3.5 million people living primarily at a subsistence level. Geologically, the country contains a few places that may be marginally favourable for uranium deposits. A uranium potential in the upper half of Category 1 is assigned. (author)

  5. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Singapore

    International Nuclear Information System (INIS)

    1977-12-01

    Singapore's fairly small size belies its wealth which comes not from production and use of its own raw materials including mineral products, but from importing raw materials and using them in manufacturing and refining. The state has a granite core exposed in the center of the island covered on the west by quartzites and shales, and on the east by recent detritus. There is no mining industry and no uranium potential is assigned to Singapore. (author)

  6. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Italy

    International Nuclear Information System (INIS)

    1977-10-01

    The Italian Republic comprises a 1200 - Km - long peninsula ex- tending from southern Europe into the Mediterranean Sea, and a number of adjacent islands, among which the principals are Sicily and Sardinia. The total area is in excess of 300,000 Sq.Km, the islands account for some 50, 000 Sq.Km. From a physiographic and morphologic point of view, Italy mainly consists of the Alpine region and the Po valley to the North and of the Appennine range and small Coastal plains to the Centre and South. Plains occupied only 20% of the total area, hills and mountains, up to 4,810 m of elevation, contribute almost equally to the remaining 80%. The most promising uranium mineralizations have been found in the Bergamasc Alps, near the small town of Novazza. Pitchblende and minor sphalerite (formation temperature, 80 deg. - 100 deg. C) occur disseminated in volcanics of permian age. The host rocks at the Novazza uranium deposit, consist of an acid ignimbrite with cineritic texture. The rocks have been affected by metasomatism which brought abundant neo-formation minerals such as silica, sericite, carbonates and minor adularia, albite and muscovite. The reasonably assured resources of the Novazza deposit have been estimated to be 1,200 ton of U having a grade of 900 p.p.m. U. Estimated additional resources are 1,000 ton U. Production is scheduled to start in 1980

  7. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Sikkim

    International Nuclear Information System (INIS)

    1977-11-01

    Sikkim is a country in the eastern Himalayas and is bound on the west by Nepal, on the north by Tibet, on the east by Bhutan and on the south by India. Precambrian Darjeeling gneiss forms the rim of the amphitheatre while schists of Late Precambrian to Lower Paleozoic rocks form tee habital interior. A small outcrop of carboniferous to Permain methomorphic rocks is preserved in the Tista Basin as well in a thin outcrop trust upon fluvitile beds of Sivalik which is mostly of Pliestocene age. Imbricate thrusts have stacked the rocks in a vast heap where reverse metamorphism is common. Ni information is available concerning uranium occurrences and resources as well as past and present explorations. The uranium potential of Sikkim is almost zero

  8. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Belgium

    International Nuclear Information System (INIS)

    1977-12-01

    Uranium occurrences and resources - To date the uranium identified in Belgium is limited to a number of occurrences and none of these have as yet proved significant from a reserve or resource viewpoint. The main uranium occurrences ares (1) In the Upper Cambrian graphite schists corresponding to the culm of Sweden small zones are found (30 - 50 cm thick) with an average of 20 ppm uranium. (2) Near Vise at the base of the Carboniferous the Visean formation is discordantly superimposed on the Permian (Frasnian) and overlain by shales and phyllites. Solution pockets at the boundary contain phosphatic lenses that contain uranium values of up to 200 ppm. Autunite and Torbernite are the main uranium minerals associated with a number of complex phosphatic minerals. Within the Chalk (Maestrichtien) of the Mons basin, that is mainly in the Ciply - St. Symphorien and Baudow district. Here is found enrichment of uranium up to 140 ppm over large areas related to phosphatic chalk. The thickness of the zone varies from a few to 20 metres. However, as the P 2 O 5 content is not high enough for the deposits to be exploited at present for phosphate there is little possibility of the uranium being concentrated at high enough levels to be exploited for itself alone. (4) Near to Vielsalm (in the Stavelot Massif) are some thin quartz veins containing small amounts of copper and uranium minerals (Torbornite). Values of up to 70 ppm are recorded. (5) A number of low uranium values are recorded associated with phosphatic nodules and zones in the Lower Pleistocene and Tertiary

  9. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Nigaragua

    International Nuclear Information System (INIS)

    1977-08-01

    On invitation of the Nicaraguan Government, the U. S. Atomic Energy Commission conducted a reconnaissance for uranium in March, 1953. Operating and abandoned mines, as well as prospects, formations, contacts, dikes and sills enroute to these mines were tested by scintillometer. Reconnaissance included two mineralized areas exposed in windows within the volcanic belt but did not include the schists and granitic intrusions in the north eastern part of the country. No anomalous radioactivity was detected. No uranium occurrences were discovered during the 1953 reconnaissance and no uranium deposits or prospects are indicated on the metallogenetic map of Central America or in the bibliography of Nicaraguan geology. Information is net available on current exploration in Nicaragua. All subsoil mineral resources besides quarry materials belong to the state. In the interest of national defence, uranium, thorium, lithium and their derivatives, along with certain other mineral substances, may be classified as o f temporary strategic interest , and their exploration or exploitation would then be subject to special laws. The Ministry of Economy may establish permanent or temporary national reserves on which mining activities are essentially precluded. Foreign nationals and corporations may acquire mineral concessions although particular regulations may be applicable to such an acquisition. Exploration of any favourable formations has been hindered by volcanic ash cover in western Nicaragua and dense vegetation in the East. Little geologic work has been done on the Paleozoic metamorphic rocks or Todos Santos Formation of the Northern Highlands. These could possibly show some potential for discovery of uranium as might the alaskites near Siuna. The potential resources of Nicaragua are estimated at less than 1,000 tonnes uranium

  10. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Israel

    International Nuclear Information System (INIS)

    1977-12-01

    The geology of Israel is relatively simple. Most of the country is underlain by sedimentary rocks of Secondary and Tertiary age. As far as the IAEA is aware no systematic exploration has been done for conventional type uranium deposits. Israel has no uranium deposits, and no high or low-grade uranium ores. However, there are uranium 'sources' which are mainly phosphate rock.Proven phosphate reserves in Israel are estimated at about 220 million tons in five different locations. The average uranium concentration is between 100 and 170 ppm. This makes the uranium content in the proven phosphate reserves of Israel to be about 25,000 tons. Together with the possibility of additional discoveries and on the assumption that the economic conditions for the production of both phosphate and uranium become favourable the Speculative Potential is placed in the 10,000 to 50,000 tonnes uranium category. (author)

  11. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Indonesia

    International Nuclear Information System (INIS)

    1977-10-01

    Indonesia is a country of south east Asia comprising a large island group extending east-west for over 3000 miles. The geology of Indonesia is fairly well known but is extremely complicated. Successive mountain movements took place around an ancient crustal area. The oldest, of Permian-Triassic age formed northeast Sumatra, northern Java and western Kalimantan. This was followed by the Sumatra orogenesis and finally in Cretaceous and Tertiary times the southern half of Java and the islands as far as New Guinea were formed. Geological studies tend to indicate that the most favourable uranium areas are likely to be in West Sumatra and West Kalimantan. Exploration by the Directorate of Survey and Geology of the National Atomic Energy Agency has been carried out on a small scale since 1961. Exploration concession have been granted to French, German and Japanese organisations. No uranium reserve or resource figures have ever been stated but small occurrences and radioactive anomalies have been found in West and South Sumatra, West and Central Kalimantan and in West Irian. Although the geology of some areas appears to be favourable, little success has attended exploration efforts to date and thus the Speculative Potential is noted as between 1,000 and 10,000 tonnes uranium. (author)

  12. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Malaysia

    International Nuclear Information System (INIS)

    1977-12-01

    Malaysia is a country of 330,000 square kilometers and a population of 11.9 million. The country is divided into two parts 640 kilometers apart. West Malaysia consists of the Malay Peninsula, and East Malaysia of the provinces of Sarawak and Sabah, formerly North Borneo. The country is the world's leading producer of tin and rubber. Geologic descriptions in detail are difficult to find although maps are available. Uranium exploration, chiefly by the Malaysian Geological Survey, has been carried out without discovery of commercial quantities. Based on possible recovery of uranium from deeply weathered granites on the Malay Peninsula, and possible discoveries in East Malaysia, a uranium potential of 1,000 to 10,000 tonnes U (category 2) is assigned. (author)

  13. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Sweden

    International Nuclear Information System (INIS)

    1977-11-01

    Sweden, covers an area of approx. 450 000 square kilometers. It has a population of 8 millions. With few exceptions in the northern part the access can be regarded as good. A dense network of motorroads and railroad exists. The results obtained by the exploration works combined with other available geo-information permit a separation of two principal uranium provinces in Sweden. The first one is confined to sediments of Upper Cambrian and Lower Ordovician which appears in Southern Sweden and along the border of the Caledonian mountain range in Central Sweden. The uranium occurrence are stratiform, of blackshale type which occurs in the Peltura zone of Upper Cambrian or they are associated to a phosphatite-bearing unit of Lower Ordovician overlying the Cambrian shale formation. The distribution of uranium in Upper Cambrian rocks is in general dependant on their lithology which itself is related to the paleography. This conditions explain relatively higher uranium content of the shale from Billigen.The potential resources of the province are estimated at about 1 million tonnes uranium. The second uranium province, called Arjeplog-Arvidsjaur, situated immediately south of the Arctic circle, comprises one deposit - Pleutajokk - and a group of more than twenty occurrences of similar characteristics and age (1 700 - 1 800 my.). The results of the past exploration have shown that uranium is present in different types of rocks. Because of the presence of uranium in many of the pegmatites the possibility of the formation of large low grade deposits should be tested. Favourable areas are those regions where the geological conditions are similar to the geology of the Grenville province in Canada or the Damara belt of SW-Africa. Special studies are recommended on this subject

  14. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Finland

    International Nuclear Information System (INIS)

    1977-11-01

    Finland covers an area of 337,000 skm. One third of the country lies north of the northern polar circle. 31,613 skm are covered by lakes. 71% of the landscape are covered by coniferous -wood. Climatlcal conditions are continental. The topography of the country is gently rolling with highest elevations of 300 m in the northern part. The most interesting geological units for uranium are Karelian, marginal meta-sediments, mainly quarzites and conglomerates but also schists. These schists are intruded by orogenlc plutonic rocks which are 1800-My-old. Potassium granites are common adjacent to the contact of the Pre-karelian basement (2500 My). In addition to these geological environment uranium and thorium minerals have been found in a large carbonatite in northern Finland, which is explored now

  15. International Uranium Resources Evaluation Project (IUREP) national favourability studies: France

    International Nuclear Information System (INIS)

    1977-09-01

    France, with an area of 550,000 km 2 , has been prospecting its territory for uranium for more than 30 years. The proven uranium reserves in all the ore categories defined by the NEA/lAEA are estimated at around 120,000 tU, of which 25,000 tU have already been mined. About 70% of these reserves are associated with granites, while the bulk of the remainder is located in Permian sediments and the last in Paleogene sediments. The prospecting effort has not been distributed equally over French territory. More than half of it - recent orogens and large basins - have been little or very little prospected. On the other hand, the Hercynian massifs and their Upper Paleozoic mantle have been systematically prospected. Nevertheless, even within the latter there is still room for further exploration: extensions of already known mineralizations both laterally and vertically, conventional mineralizations deep down or under a mantle, types of mineralizations not investigated previously (those associated with acid or intermediate vulcanism, peribatholithic shales, alkaline complexes etc.). Of course, in the areas that have not been so well explored, because they appear less favourable, there are still some possibilities, namely, in the areas of recent orogens, mineralizations associated with antemesozoic cores (same types as above) or directly associated with orogenesis (slightly to moderately metamorphic sandstone-phyllitic formations, certain sedimentary formations etc.). As for the large basins, they are capable of containing mineralizations associated with some of their formations (Paleogene of the Basin of Aquitaine etc), but they may also cover workable uranium deposits. It is possible that, in the not to distant future access may be gained to such ores in particular cases. On this basis it does not seem unreasonable to reckon with the discovering of new resources of an order of magnitude between half and the same as those already found. (author)

  16. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Syria

    International Nuclear Information System (INIS)

    1977-11-01

    Very little information is available to IAEA on the geology and uranium potential of Syria. In 1975 a contract was awarded to Huntings Geology and Geophysics Ltd by the Ministry of Petroleum and Mineral Resources to carry out a study of the country's mineral resources with particular reference to phosphate uranium, chrome and industrial materials. The results of this survey are not known. Apart from the assumption of some possibility of uranium recovery as a by-product from phosphate production it is assumed that the Speculative Potential is likely to be less than 1000 tonnes uranium. (author)

  17. International Uranium Resources Evaluation Project (IUREP) national favourability studies: India

    International Nuclear Information System (INIS)

    1977-08-01

    Physiographically India has a total area of 3,268,010 km 2 in three distinct regions. 1. The Peninsular shield in the south with an area of 823,310 km 2 . 2. The Himalayan mountain system with an area of 1,797,200 km 2 . 3. The Indo-Gangetic alluvial plain with an area of 647,500 km 2 . The three presently recognised major uranium provinces in India are: 1. The Singhbhum uranium province; 2. The Rajasthan uranium province, 3. The Madhya Pradesh uranium province. The Atomic Minerals Division of the Department of Atomic Energy has carried out a vigorous exploration programme since 1949 but despite their efforts a great deal of ground has still to be explored. At present, structurally controlled deposits account for most of the uranium resources of India. Uranium occurrences and deposits have been outlined in (1) Vein type deposits (the Singhbhum belt), (2) Conglomerate (Karnataka and Udaipur area, Raiasthan), (3) Sandstones (Madhra Pradesh and Swaliks, Himachal Pradesh, (4) Others such as carbonatites, marine phosphates, etc, (Mussorrie - Sahasradhara In Uttar Pradesh and Chatterpur-Saucur in Madhya Pradesh), (5) By-product Uranium in copper tailings and beach sands. India's total resources are listed as 52,538 tonnes uranium (68,300 short tons U 3 O 8 ) with additional resources from monazite of 12700 tonnes uranium. In view of the wide geological favourability, the many types of occurrences already known and the vast areas of unexplored ground it is estimated that the Speculative Potential may be between 150,000 and 250,000 tonnes uranium which is Category 5. (author)

  18. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Iran

    International Nuclear Information System (INIS)

    1977-12-01

    Iran is on the southern flank of the Alpine-Himalayan mountain system and has within its extensive boundaries rocks ranging from crystalline metamorphics and igneous rocks of Precambrian age to sediments of Tertiary - Pleistocene age, some of which could be considered as potentially favourable for uranium deposits. The search for uranium started about 1959 and in the following years some 40 radioactive anomalies and a small number of uranium occurrences were identified. In 1977 the Atomic Energy Organization of Iran greatly expanded its exploration activities and contracted for 895,000 line kilometres to be flown by three contractors in an aerial spectrometric survey designed to cover almost the two fifths of the whole country. The follow-up of this survey will continue for several years. Purely on the basis of its size (1,648,004 km 2 ), its several favourable host rock areas, its location on the flank of the Alpine-Himalayan system and the relatively small amount of systematic exploration coverage completed to date the Speculative Potential could be placed in the 50,000 - 100,000 tonnes category. (author)

  19. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Philippines

    International Nuclear Information System (INIS)

    1976-12-01

    Comparison between the geology of the Philippines and favourable geological environments for uranium in other parts of the world suggests that the Philippine geology is not likely to be favourable for the discovery of uranium. Previous work has been mainly of a reconnaissance type and orientated mainly to checking the existing mining areas for radioactivity. The only occurrence known at the present time is at Larap Mine in the Paracale District of Camarines Norte in Luzon. A magnetite iron ore body operated by Philippines Iron Mines Inc contained certain distinct beds, which, in addition to magnetite also contain copper, molybdenum and iron sulphides and uraninite. It is estimated that 200 short tons U 3 O 8 is contained in 500,000 tons ore grading 0.04% U 3 O 8 at Larap. A number of other largely untested but similar occurrences have also been identified in the Paracale District. A few small occurrences of uranium have recently been identified on the island of Samar. It is suggested that the Speculative Potential of the Philippines may be of the order of 1000 tonnes U 3 O 8 . (author)

  20. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Afghanistan

    International Nuclear Information System (INIS)

    1976-12-01

    Although Afghanistan has an extent of some 650,065 square kilometres, only a very small proportion of it has been surveyed for uranium, and that only at the preliminary reconnaissance stage. Earlier work by bi-lateral teams identified a number of small uranium anomalies and occurrences and more recently (1974-75) an IAEA geologist discovered evidence of uranium mineralisation in the Neogene - Lower Pleistocene continental sediments of the Jalalabad Basin to the east of Kabul. The I.A.E.A. expert outlined three areas totalling 20,000 km where systematic uranium exploration would be justified. Up to the present no positive programme has been agreed. On very tenuous evidence a Speculative Potential of 2000 tonnes U 3 O 8 is suggested for Afghanistan. (author)

  1. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Chile

    International Nuclear Information System (INIS)

    1977-08-01

    Chile has an area of 740,760 square kilometers. The capital is Santiago. The country is 4,183 km. long and ranges from 22.5 to about 354 km. in width. Its chief topographic features para]lei each other - the Coastal Range, Andes Mountains and Central Valley. The Coastal Range rises to 2,130 meters in the north, but averages from 610 to 700 meters high generally. The range plunges into the Pacific Ocean far south of Valparaiso and reappears in the southern archipelagic islands. The Andes extend along nearly the entire length of Chile and contain 100 volcanoes. Andean peaks range mostly from 3,000 to 6,700 meters in elevation. In southern Chile the Andes are lower, and contain about a dozen major lakes. The mountains disappear in Chilean Patagonia, but reappear at Cape Horn. The Central Valley lies between the Coastal Range and the Andes, being best defined in the midland region as a 64 to 72 km sloping plain. It is the Chilean heartland with three-quarters of the country's population. Salt basins are found over much of northern Chile in the very arid desert, while the region south of the Gulf of Reloncavi consists of unpopulated islands, fjords, channels and heavily forested mountains. The Strait of Magellan, the Tierra del Fuego archipelago and a flat grassland area make up the extreme southern end of the country. Much of Chile is subject to flash floods, earthquakes, volcanic eruptions, landslides and avalanches. In September 1976 the Comision Chilena de Energia Nuclear (CCEN) was given exclusive rights to negotiate contracts with private companies for the exploration, development and mining of uranium and other radioactive minerals. The new law provides the CCEN with considerable flexibility in the terms of the contracts. Pre-964 owners of uranium deposits may reach agreements with foreign companies to mine the uranium, but since 1964 all uranium has belonged to the state. Uranium produced in the country can only be exported after Chile's needs have been met. The CCEN has invited proposals from international mining companies for the recovery of uranium from copper-bearing waters at the large Chuquicamata mine. As of mid-1977, it was reported that one proposal from all. S. company had been received. It has been estimated that production of 85 tonnes U/year might be realized here. Relatively little interest is shown in uranium by domestic (Chilean) companies because of the fear that the discovery of uranium might lead to nationalization of the properties. In spite of the possibilities mentioned above, there has been relatively little uranium discovered to date in Chile. In view of the relatively small size of these known deposits and until reconnaissance has taken a harder look at these possibilities, it would be prudent to place the potential of Chile in the 1,000-10,000 tonnes range

  2. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Portugal

    International Nuclear Information System (INIS)

    1977-10-01

    Portugal is situated on the western edge of the Iberian Meseta. At present, its reasonably assured reserves are about 7800 t of U (including 1000 t of U at more than 830/lb U 3 O 8 ) and 850 t of U in estimated additional reserves. This potential is divided between vein deposits and deposits located in the peribatholithic schists or enclaved in granite. Two main districts share these reserves - Beira at the centre of the country and Alto Alentejo in the east, approximately at the same latitude as Lisbon. In spite of the considerable prospecting activities authorized by Portugal in the Meseta area, the subject cannot yet be regarded as exhausted. Additional resources may still be located in the horizontal and vertical extensions of the vein mineralizations or schists from the already known deposits or outside the districts containing such deposits. Moreover, certain post-Palaeozoic sedimentary basins exhibit features favourable for the presence of uranium-bearing deposits and therefore deserve to be taken into consideration. However, there are as yet no examples of economic mineralization in such locations in Portugal. All things considered, we considered it reasonable to place Portugal in category No. 3 of the classiffication adopted by BJREP. (author)

  3. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Mexico

    International Nuclear Information System (INIS)

    1977-07-01

    Reserves of uranium are located in the north eastern part of Mexico, primarily in the states of Tamaulipas and Chihuahua. Most of the remainder of Mexico's reserves are near the Tamaulipas-Neuvo Leon state border in the Tertiary Frio Formation, where they apparently occur in the types of uranium deposits found in Texas, U.S.A. There are two deposits, La Coma and Buenavista, but nothing has been published on dimensions of the ore bodies. Forty-five miles northeast of Hermosillo, in Sonora state is the Los Amoles district where uranium is found associated with gold and other metals in low-grade deposits on the margins of a Cretaceous batholith. Another occurrence is reported in the mining district of Placer de Guadelupe and Puerto del Aire, about 40-50 km northeast of Chihuahua City, in the state of Chihuahua. Reserves of U 3 O 8 which were published in January 1977 by Nuclear Exchange Corporation of Menlo Park, California, are listed. The government of Mexico has not estimated potential resources. It should be noted that much of Mexico appears favourable for uranium, and only 10 percent has been explored. According to NUEXCO (1977), efforts to find uranium are being increased in an attempt to supply Mexico's nuclear reactor requirements through 1990. Activity is reported to be centered in Tamaulipas and Chihuahua states and to a lesser extent in Nueva Leon, Sonora, Coahuila, and Baja California. Major effort will continue to be placed in Chihuahua state to supply the Penna Bianca mill. Correspondence between favorable geological settings for uranium and the geologic regions of Mexico is reported. Mexico is a country with considerable areas that appear promising for discovery of sandstone, vein, and tuff-related deposits. On the other hand, its potential for Precambrian conglomerate and unconformity-related deposits is limited. Considering these geologic factors, as well as the relatively limited amount of exploration done to date, a guesstimate of speculative potential is 100,000 tons U 3 O 8

  4. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Brazil

    International Nuclear Information System (INIS)

    1977-06-01

    Brazil occupies an area of about 8.5 million square kilometers -- almost half of the South American continent. The dominant geographic feature is the Amazon basin. The Amazon River and its more than 200 tributaries drain about 60 percent of the country. The basin is a vast tropical rain forest, whereas the remainder of Brazil is made up predominantly of highlands. The Central Highlands, which extends into the Amazon basin, occupies nearly all of southern Brazil and includes major mountain chains such as the Serra do Mar, Serra da Mantiqueira, and Serra do Espinhago. The Guiana Highlands fringe the northern Amazon basin and extend into Venezuela, Guyana, Surinam, and French Guiana. Lowland areas other than the Amazon basin are found in western Mato Grosso, and along the Atlantic coast from French Guiana to Uruguay. The geology of Brazil is dominated structurally and areally by three major shields composed of crystalline rocks of Archean and Proterozoic age. Collectively they comprise the Brazilian complex which is probably the largest Precambrian outcrop in the world. The complex is made up of gneisses, granites, mica schists, quartzites, dolomites, skarns, diorites, itabirites and gabbros, many of which are deeply metamorphosed. Faults, quartz veins, and dikes are common. Recurrent granitization has occurred from the Precambrian to Late Tertiary. The area of Brazil is large and its geology is favorable, in places, for every known type of uranium deposit. This is not reflected in the amount of 'known' and 'inferred' reserves -- slightly more than 21,000 tons. Rather, it is an indication of the small amount of exploration done, taking into account the large area to be covered. The speculative potential can only be guessed. It is guessed to be 500,000 tons

  5. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Oman

    International Nuclear Information System (INIS)

    1977-11-01

    The geology of Oman is unlikely to lie favourable for uranium occurrence being mainly of marine sedimentary origin. No exploration for uranium has been reported or is planned. The Speculative Potential is placed in the category of less than 1000 tonnes uranium. (author)

  6. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Argentina

    International Nuclear Information System (INIS)

    1977-08-01

    Argentina is a predominantly lowland area of 2,789,240 square kilometers. The capital is Buenos Aires. The entire length of Argentina is bordered on the west by the Andes Mountains. Tile Northwest Andes-Piedmont region consists of deep valleys containing salt basins and volcanoes, and is an earthquake zone. Patagonia, in the south, is essentially an arid region of windy plateaus and valleys. The southern Andes are narrower and lower than the northern Andes and in the extreme south contain glaciers and ice fields. The east-central plain (Pampa) of Argentina has dry and humid sectors and contains most of the population. The largest rivers are chiefly in the northeast, many having only seasonal flow. There has been extensive surface and subsurface exploration for uranium in Argentina for over 20 years. Although most of the work has been performed by the CNEA, advisors from the U.S. and from the IAEA have also taken part. Private industry has been involved, but apparently only on a small scale. In the OECD report of 1970, it was stated that 400,000 square kilometers of Argentina appear very favorable for uranium while an additional 900,000 square kilometers offer fair possibilities. Uranium exploration to date suggests that sandstones of Permian and Cretaceous ages exposed in Western Argentina in the Cordillera are very promising for discovery of new deposits. Past CNEA estimates have indicated that there is considerable hope for new discoveries in those areas where reserves are now known. In addition to the known uraniferous provinces which are indeed favorable for further exploration, there are several other large areas that warrant attention. There are, for example, in the Santa Cruz area of about 15,500 square kilometers Cretaceous and Tertiary sediments with favorable facies for uranium deposition. In the Patagonia Cordillera, Jurassic, Cretaceous, and Tertiary sediments are of interest for prospecting, These rocks contain carbonaceous material and have been intruded by acidic rocks. The High Cordiilera, an area of 200,000 square kilometers in northwestern Argentina contains sedimentary, metamorphic, and igneous rocks that could be favorable although the difficult topography is a restrictive influence. The distribution of uranium mineralization in various sediments and other rock types over large areas of Argentina is suggestive of widespread favorability for uranium-ore formation. Inasmuch as uranium reserves plus potential are already estimated at close to 80,000 tons U 3 O 8 , and exploration has not been exhaustively conducted, ultimate resource potential might realistically be expected to fall in the 100,000 to 500,000 ton U 3 O 8 range

  7. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Vietnam

    International Nuclear Information System (INIS)

    1977-11-01

    The Chaine Annamatique represents the last of the three orogenic episodes that shook Indochina and forms most of Vietnam's boundary with Laos, In south Vietnam the mountains which have a north-south trend are formed of granites, gneisses and mica schists and are inseparable from the anti-hercynian formations. Iron ore, gold, lead, copper, tin, wolfraun, bismuth and molybdenium minerals are found. Plans had been made in 1960 to prospect for uranium but no information is available on whether that work was ever done. The only evidence of occurrences of nuclear raw materials is that titaniferous sands occur in several coastal regions and that uranium was once listed as having been produced in Forth Vietnam. Although the geology of Vietnam is not very conducive to the formation and preservation of uranium deposits it is possible that because of the granite terrain and presence of other metalliferous minerals, the Speculative Potential should be stated as in category 2 i.e. from 1,000 to 10,000 tonnes uranium. (author)

  8. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Thailand

    International Nuclear Information System (INIS)

    1977-08-01

    Thailand is a country with an area of 514?000 square kilometres situated in the centre of continental south-east Asia, The geology of Thailand is very varied with sedimentary formations ranging from Cambrian to Quaternary in age and including sandstones, shales, limestones of many varieties. Among the igneous rocks, granites are very important and rhyolites, tuffs diorites, basalts and ultrabasic rocks also exist. Tin is the most important mineral occurrence. Available information on the geology and mineral resources suggests that the country may contain significant resources of radioactive minerals. Favourable potential host types are; 1) uranium and thorium in monazite in beach sands and tin placer deposits; 2) uranium in sandstones, principally in Jurassic sandstones of the Khorat Plateau; 3) uranium in Tertiary lignite deposits; 4) uranium in veins in granites; 5) uranium related to fluorite deposits; 6) uranium in black shales and phosphates. Uranium mineralization in sedimentary rocks at Phu Wieng was discovered in 1970. The area has been radiometrically grid mapped and limited shallow drilling has shown continuity.of the narrow, carbonaceous, conglomeratic sandstone host bed. No uranium reserves or resources can be stated at the present time, but the favourable geology of the Khorat Plateau, the known uranium occurrence and the very small exploration coverage is possibly indicative of a good future potential. The Speculative Potential is estimated to be between 1000 and 10,000 tonnes uranium. (author)

  9. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Turkey

    International Nuclear Information System (INIS)

    1977-08-01

    Turkey has an area of 296 185 sq mi or 767 120 square kilometers. The geology is dominated lay Tertiary and post-Tertiary rocks which are very widespread but extensive outcrops of Mesozoic rocks also occur. Paleozoic rocks, mainly gneisses, mica schists and quartzites occur in the ancient massifs, principally the Istranca massif in Thrace, the Merideres massif in western Anatolia and the Karrshir massif in central Anatolia. Prospecting for uranium began in Turkey in 1953 and the Atomic Energy Raw Materials Division of the Maden Tetkikive Arama Enstitusu (M.T.A.) was founded in 1956. By 1962 a total of 78% of the whole country had been covered by serial radiometric reconnaissance prospecting. Uranium was discovered at Kasar in western Anatolia in 1961 and several hundred tons of reserves estimated two years later. Uranium prospecting was largely recessed from 1963 to 1967. IAEA/UNDP assistance was provided in 1962-63 and 1965 and between 1974 and 1977 in a detailed exploration programme in the Kasar area. In the whole country nearly 600 anomalies and occurrences had been identified by 1963. Several occurrences principally in Western Anatolia had been assigned a small reserve. A recent official estimate places the total national reserve at 3150 tonnes uranium in the less than 30% category of reasonably assured resources. A speculative Potential of between 30,000 and 50,000 tonnes uranium is considered to be reasonable. (author)

  10. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Jordan

    International Nuclear Information System (INIS)

    1977-08-01

    Jordanian geology is dominated by the Great Rift Valley System. Most of the country is covered by Cretaceous and Eocene sediments, largely sandstones and limestones. These include phosphorates and bituminous limestones in the Upper Cretaceous, South of the Dead Sea, Mesozoic and Paleozoic rocks overlie exposed granitic Pre Cambrian basement rocks carrying many minor intrusives . Phosphates provide the main mineral export of Jordan. The Natural Resources Authority (Geological Survey and Bureau of Mines) initiated a survey in 1972 of the distribution of uranium on the phosphorite horizon. In 1974 the Survey calculated that the uranium content of the phosphate areas surveyed up to that time was 5 million metric tonnes U 3 O 8 . The average U 3 O 8 content is approximately 0.02% U 3 O 8 . The exploitation of such resources would be as a byproduct of the phosphate industry and dependent on the rate of phosphate production and the capacity of triple super-phosphate plants, none of which exist at the present time. In the southern area in Paleozoic and Pre Cambrian areas there are some hopes of conventional type deposits being found but the potential appears to be small. (author)

  11. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Lebanon

    International Nuclear Information System (INIS)

    1977-10-01

    Geologically speaking, Lebanon is a young country since the oldest rocks are of Upper Jurassic age. Two volcanic periods are included in the more recent rocks. The country is intersected by numerous faults mainly striking NNE but also including numerous small transverse faults. No prospecting for nuclear raw materials has been recorded and there is no known activity at the present time. Lebanon has no national geological organization to support uranium prospecting. From the geological standpoint, possibilities of occurrences of nuclear minerals in Lebanon are poor and the Speculative Potential is placed in the less than 1000 tonnes uranium category. (author)

  12. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Luxembourg

    International Nuclear Information System (INIS)

    1977-12-01

    The Grand Duchy of Luxembourg is a tiny, roughly triangular, sovereign state situated in Western Europe and bordered by Belgium, the Federal Republic of Germany and Prance. Its total surface area is 998 sq. miles (2,586 sq. kilometres). Its situation in Europe has made it a natural crossroads, with its language, economic interests and ways of life reflecting its close association with its neighbours. It has, however, remained a separate, if not always autonomous, political unit since the tenth century. It is one of the nine member states of the European Economic Community. The country is made up of an elevated northern tableland and a southern lower plateau. The northern section comprises part of the Ardennes mountains which continue in south-east Belgium and form a plateau generally ranging between 1,000 and 2,000 feet. Iron ore mines are located near the French border. The southern section has an elevation of below 15,000 feet and comprises mainly heavily wooded good agricultural land. There has been virtually no work done; no uranium occurrences of significance are recorded. No specific exploration for uranium in Luxembourg is apparent at the present. There are no specific regulations relating to uranium exploration,which is covered by the rules relating to mineral exploration in general

  13. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Bahrain

    International Nuclear Information System (INIS)

    1977-11-01

    Bahrain consists of limestone, sandstone and marl of Cretaceous and Tertiary ages. The potential for discoveries of uranium is very limited and thus the Speculative potential is placed in the category of less than 1000 tonnes uranium. (author)

  14. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Burma

    International Nuclear Information System (INIS)

    1977-10-01

    There is no information on production of nuclear raw materials in Burma, although there are some uranium occurrences. Hunting Geophysics Ltd has done some aerial prospecting work in the area of Victoria Point in Southern Burma. All the data collected has been plotted on several maps and issued to various Burmese organizations, with a complete report. The follow-up ground exploration was done by a prospecting party headed by Dr Gjelsvik. The Hunting Geophysics' and Dr Gjelsvik reports are not available in the IAEA. The Raw Materials Division in the Union of Burma Atomic Energy Center commenced operations in 1955. The area of Mogok was selected by U Soo Win, the head of the Division, as most favourable for uranium exploration. The region is mountainous, with heavy forest cover. A ground gamma-ray survey was carried out in Mogok Mineral Belt by two geologists accompanied by two assistants, at a spacing of one km. This work showed monazite in all streams over an area of about 150 sq km and has given a detailed studies led to the discovery of some uraninite and pitchblende in the overburden of an old lode. Based, on these first discoveries the Government of Burma requested assistance from the IAEA and an expert was sent there for a period of one year. His field work was mainly limited in the Mogok Mineral Belt, however some reconnaissance field trips were made in other parts of the country. Dr D L Searle concluded that the Mogok area represents a zone of high temperature mineralization but a lower temperature form of uranium mineralization may have developed along the outer edges of the principal high grade zone. He recommended that the area between the Mogok scarp and the Shweli River be systematically traversed. Uranium bearing minerals in Burma are the following: monazite bearing beach sands near Amherst, Tenasserim; monazite placers from near Momeik, Northern Shan States; uraninte crystals from the gem-gravels around Mogok; a radioactive anomaly in syenite at Kyatpyin, near Mogok; radioactive iron ore at Pangpet, near Taunggyi, Southern Shan States and radioactive fossil wood from Central Burma. From structural point of view the most favourable geological environments for new discoveries are those in the Central, Basin, or as it is named Irrawaddy Basin and Shan Plateau massif. Sedimentary rocks of enormous thickness were formed, in the intramountain Irrawaddy Basin during the Tertiary Period. There is no information about the facies of the sediments but it could be supposed that most of these strata were deposited either in fans or rivers and have features of fluvial facies which is most favourable for uranium concentration leached from surrounding granites and alaskite in Shan plateau massif. The radioactive fossil wood from Central Burma may be an indication for uranium favourability of this basin. The known uranium occurrences in Mogok Belt could be considered, as indicative of some uranium potential of the region mainly of the alaskite and the areas around it. There is also potential in the Tawang Peng area of the Northern Shan States, where the famous multi-metal Bawdwin mine is located in a series of rhyolitic tuffs, lava flows and breccias, interspersed with coarse feldspathic grits of early Paleozoic age. The speculative potential could be about 10,000 tonnes uranium

  15. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Australia

    International Nuclear Information System (INIS)

    1977-08-01

    In Australia most exploration for uranium has been conducted by companies and individuals. The geological mapping and airborne radiometric surveying conducted by the BMR is made available to interested persons. Exploration for uranium in Australia can be divided into two periods - 1947 to 1961 and 1966-1977. During the first period the Commonwealth Government introduced measures to encourage uranium exploration including a system of rewards for the discovery of uranium ore. This reward system resulted in extensive activity by prospectors particularly in the known mineral fields. Equipped with a Geiger counter or scintillometer, individuals with little or no experience in prospecting could compete with experienced prospectors and geologists. During this period several relative small uranium deposits were discovered generally by prospectors who found outcropping mineralisation. The second phase of uranium exploration in Australia began in 1966 at which time reserves amounted to only 6,200 tonnes of uranium and by 3 977 reserves had been increased to 289,000 tonnes. Most of the exploration was done by companies with substantial exploration budgets utilising more advanced geological and geophysical techniques. In the field of airborne radiometer the development of multi-channel gamma ray spectrometers with large volume crystal detectors increased the sensitivity of the tool as a uranium detector and resulted in several major discoveries. Expenditure or exploration for uranium increased from 1966 to 1971 but has declines in recent years. After listing the major geological elements of Australia, its uranium production and resources are discussed. During the period 1954-71 the total production of uranium concentrate in Australia amounted to 7,780 tonnes of uranium, and was derived from deposits at Rum Jungle (2,990 tonnes U) and the South Alligator River (610 tonnes U) in the Northern Territory, Mary Kathleen (3,460 tonnes U) in Queensland and Radium Hill (720 tonnes U) in South Australia. The only production at the present time is from the Mary Kathleen deposit which as at 30 June 1977 had produced a further 513 tonnes of uranium since it recommenced operations in 1976. Australia's uranium resources as at 30 June 1977 are estimated as follows (1) Recoverable up to a cost of US$80/kg U (US$30/lb U 3 O 8 ): Reasonably assured resources: 289-000 tonnes U; Estimated additional resources: 44,000 tonnes U. (2) Recoverable at a cost of US$80-130/kg U (US$30-50/lb U 3 O 8 ): Reasonably assured resources : 7,000 tonnes U; Estimated additional resources : 5,000 tonnes U. The reasonably assured resource category is as defined by NEA/IAEA. In expressing Australia's resources the estimated additional resource category is defined as: 'Estimated Additional Resources are confined to uranium which could be recovered within the given cost ranges from those known deposits where there are insufficient data to classify the resources as 'Reasonably Assured', and to extensions of known deposits beyond the limits of 'Reasonably Assured Resources' in those deposits. Quantitative estimates of speculative uranium resources have not been made for Australia

  16. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Burma

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-10-15

    There is no information on production of nuclear raw materials in Burma, although there are some uranium occurrences. Hunting Geophysics Ltd has done some aerial prospecting work in the area of Victoria Point in Southern Burma. All the data collected has been plotted on several maps and issued to various Burmese organizations, with a complete report. The follow-up ground exploration was done by a prospecting party headed by Dr Gjelsvik. The Hunting Geophysics' and Dr Gjelsvik reports are not available in the IAEA. The Raw Materials Division in the Union of Burma Atomic Energy Center commenced operations in 1955. The area of Mogok was selected by U Soo Win, the head of the Division, as most favourable for uranium exploration. The region is mountainous, with heavy forest cover. A ground gamma-ray survey was carried out in Mogok Mineral Belt by two geologists accompanied by two assistants, at a spacing of one km. This work showed monazite in all streams over an area of about 150 sq km and has given a detailed studies led to the discovery of some uraninite and pitchblende in the overburden of an old lode. Based, on these first discoveries the Government of Burma requested assistance from the IAEA and an expert was sent there for a period of one year. His field work was mainly limited in the Mogok Mineral Belt, however some reconnaissance field trips were made in other parts of the country. Dr D L Searle concluded that the Mogok area represents a zone of high temperature mineralization but a lower temperature form of uranium mineralization may have developed along the outer edges of the principal high grade zone. He recommended that the area between the Mogok scarp and the Shweli River be systematically traversed. Uranium bearing minerals in Burma are the following: monazite bearing beach sands near Amherst, Tenasserim; monazite placers from near Momeik, Northern Shan States; uraninte crystals from the gem-gravels around Mogok; a radioactive anomaly in syenite at Kyatpyin, near Mogok; radioactive iron ore at Pangpet, near Taunggyi, Southern Shan States and radioactive fossil wood from Central Burma. From structural point of view the most favourable geological environments for new discoveries are those in the Central, Basin, or as it is named Irrawaddy Basin and Shan Plateau massif. Sedimentary rocks of enormous thickness were formed, in the intramountain Irrawaddy Basin during the Tertiary Period. There is no information about the facies of the sediments but it could be supposed that most of these strata were deposited either in fans or rivers and have features of fluvial facies which is most favourable for uranium concentration leached from surrounding granites and alaskite in Shan plateau massif. The radioactive fossil wood from Central Burma may be an indication for uranium favourability of this basin. The known uranium occurrences in Mogok Belt could be considered, as indicative of some uranium potential of the region mainly of the alaskite and the areas around it. There is also potential in the Tawang Peng area of the Northern Shan States, where the famous multi-metal Bawdwin mine is located in a series of rhyolitic tuffs, lava flows and breccias, interspersed with coarse feldspathic grits of early Paleozoic age. The speculative potential could be about 10,000 tonnes uranium.

  17. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Honduras

    International Nuclear Information System (INIS)

    1977-08-01

    In 1953, the U.S. Atomic Energy Commission, on invitation of the government of Honduras, conducted uranium reconnaissance in parts of the country. The survey consisted of scintillometric examination of all formations, veins, dikes, sills and contacts along more than 1,500 km of road. Additionally, 17 mines and prospects were examined, but in no location were uranium occurrences found. The largest and most consistently radioactive deposit noted was a body of volcanic ash at Santa Rosa de Copan, a sample of which assayed 15 ppm U 3 O 8 . A uranium prospect has been described from the Yatnala area in northwest Honduras. Uraninite and oxidation products occur in association with copper and mercury minerals in veinlets as well as disseminations in a Lower Cretaceous limestone conglomerate, the llama Formation. The llama Formation is the conglomeratic facies of the Atima (limestone) Formation, both of which are in the Yojoa Group. At the time of the U. N. development program survey in May, 1970, no uranium deposits were known in Honduras. Information is not available on current exploration in Honduras. The state owns most mineral deposits but may grant rights for exploration and exploitation of the subsoil. Mineral and surface titles are separate. Deposits of uranium and its salts, thorium and similar atomic energy substances are reserved to the state. Foreign citizens and companies, with some exceptions, may acquire mineral rights. Several groups of sediments might be of interest for uranium exploration. The Todos Santos redbeds and the El Plan Formation are both shallow marine and hence may contain marginal marine facies favorable for uranium. In the southern and central Cordillera, the Valle de Angeles sediments, particularly the sandstones, may be of interest. The contacts between Permian granites and schists (Paleozoic) may also warrant attention. Lacking further information on which to base a more optimistic outlook, it is estimated that the uranium potential of Honduras may be on the order of 1,000 to 10,000 tonnes

  18. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Taiwan

    International Nuclear Information System (INIS)

    1977-12-01

    Taiwan is an island of 36,000 sq km located 160 km east of mainland China. Geologically, the oldest rocks are Tertiary, and the only igneous rocks on the island are Quaternary andesites and basalts. Copper, gold, and silver are the only known metallic minerals produced. Uranium occurrences and exploration efforts are unknown. The potential uranium resource of Taiwan is considered a category 1 resource. (author)

  19. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Maldives

    International Nuclear Information System (INIS)

    1977-11-01

    Maldives, an archipelago consisting of between 1,000 and 2,000 islands and atolls in the Indian Ocean contain only 300 square kilometers and is populated by around 130,000 people who are engaged in raising of copra, fruits, taro, and other agricultural products, and in fishing. There is not now and never has been a mining industry except for quarrying of coral road metal. Geologically the coral islands, based on present geological thinking is not a favourable host or source of uranium, and is therefore assigned a zero potential. (author)

  20. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Iraq

    International Nuclear Information System (INIS)

    1977-11-01

    Iraq consists of a lowland trough lying between asymmetrical and very different upland massifs to the east, north and west and continuing southeastwards to the Persian Gulf. The region is one of crustal weakness and subsidence with relatively young plastic sedimentary rocks engulfed in downwarped, ancient, rigid and highly resistant blocks. Exploration in the 1954-55 period found some minor radioactive anomalies and very low uranium contents in limestones and phosphates. The results of an aerial radiometric survey in 1973-74 are not known to IAEA. Iraq has no reported uranium resources but there are several favourable formations which warrant a detailed survey. In view of the size of the country and the small amount of systematic exploration carried out up to the present time, the Speculative Potential is considered to lie in the 1,000 to 10,000 tonnes uranium category. (author)

  1. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Niue

    International Nuclear Information System (INIS)

    1977-12-01

    Niue is described as a coral island containing 259 square kilometers, located between Tonga and the Southern Cook Islands in the Central Pacific. Geologically, little is known, or can be deduced from available information, therefore reported occurrences of uranium are the basis for a potential in category 1 (less than 1,000 tonnes U) . (author)

  2. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Canada

    International Nuclear Information System (INIS)

    1977-08-01

    Exploration for mineral deposits in Canada resulted in the discovery of large uranium deposits, such as at Great. Bear Lake, Northwest Territories (1930), in the Elliot Lake area, Ontario (1949); Beaverlodge, Wollaston Lake Fold Belt and Carswell Structure in Saskatchewan (1946-1975) and many uranium occurrences in the Canadian Shield, in the Orogenic Belts and in the Platforms. Uranium output in Canada since 1942 until and including 1976 amounted to 112,000 tonnes U. Reasonably Assured uranium resources as of 1976 amounted to 167,000 tonnes U (at a price up to $40/lb. U 3 0 8 ) and 15,000 tonnes U (at a price more than $40 up to $60/lb. U 3 O 8 ). Estimated Additional uranium resources as of 1976 amounted to 392,000 tonnes U (at a price up to $40/lb. U-Og) and 264,000 tonnes U (at a price more than $40 up to $60/lb. U 3 0 8 ). Possible further potential beyond the above mentioned classes is tentatively estimated to be in the 6th category according to NEA/IAEA favourability classification. (author)

  3. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Cook Islands

    International Nuclear Information System (INIS)

    1977-11-01

    The Cook Islands total only 320 square kilometers in area are located in the central South Pacific, and are made up of either volcanic material or coral. Since neither rock type is considered a good host or source of uranium, the uranium potential of the Cook Islands is considered nil. (author)

  4. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Saudi Arabia

    International Nuclear Information System (INIS)

    1977-09-01

    Saudi Arabia occupies most of the Arabian Peninsula and has an area of 872,722 sq miles, or 2,260,350 sq km. The ancient Arabian Shield of igneous and metamorphic rocks comprises most of the western third of the country. The shield contains many extinct volcanoes surrounded by lava beds. Sloping eastwards are the newer sedimentary areas in which rich oil fields are found. In Saudi Arabia oil is paramount and less effort has been put into searching for mineral deposits than in other countries of similar size and geology. Pour aerial radiometric surveys have been undertaken and some of the anomalies discovered in the earlier ones were ground checked by an IAEA expert in 1963-64. Two anomalies warranted more detailed work, these were the Jabal Said anomaly in the Central Shield area and the Al Ghrayyat in Wadi Sawawin about 70 miles from the Jordan border. The Jabal Said anomaly consists of a zone of altered rocks consisting largely of pegmatite and pegmatite granite= Allanite, pyrochlore, cyrtolite, xenotime and monazite are the ore minerals,, The deposit was estimated to have 2.2 million tons of ore grading 0.2 - 0.3 percent Nb 2 O 5 and 0.03 - 0,05% U 3 O 8 . The other occurrence at Al Ghrayyat is similar but with much lower grade uranium content. In view of the huge size of Saudi Arabia, the existence of many geologically favourable rock types and the poor coverage by sophisticated uranium exploration techniques, the Speculative Potential is placed between 10,000 and 50,000 Tonnes uranium. (author)

  5. International Uranium Resources Evaluation Project (IUREP) national favourability studies: New Hebrides

    International Nuclear Information System (INIS)

    1977-12-01

    The New Hebrides consists of about 70 islands in the Southwest Pacific Ocean. The 12 largest, and main islands are volcanic cones with a few marine sediments. A manganese mining industry is presently producing but there has been no known activity in uranium exploration or mining. The area of the New Hebrides is nearly 15,000 square kilometers, and the principal industries are centered around agriculture and fishing. The uranium potential is estimated in category 1 (less than 1,000 tonnes U) (author)

  6. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Sri Lanka

    International Nuclear Information System (INIS)

    1977-10-01

    Sri Lanka is essentially a detached portion of the Deccan Plateau of south India and like it, is underlain almost everywhere by hard old Precambrian rocks. Prior to 1940 there was no systematic organised geological survey work on the island. Between 1957 and 1962 a partial aerial survey and field traverses were conducted in a search for radio- active minerals. Since then a modest programme has continued. Thorianite was first discovered in placer deposits in 1903 and prospecting has found many other refractory radioactive minerals probably derived from the weathering of pegmatites. Monazite is found as an important constituent of beach placer deposits and it is estimated to have an average content of 8-10%ThO 2 and 0.3 - 0.5% U 3 O 8 . Up to 1000 tons monazite per year could be produced from the beach sand industry. Sri Lanka has had very little systematic exploration for uranium and as it is largely composed of Precambrian rocks it deserves closer attention. On the other hand it is part of a thorium rich province and there is a body of technical opinion that believes that thorium rich provinces are unlikely to contain significant uranium deposits. For these reasons it is estimated that the Speculative Potential may be within the range of 1000 to 10,000 tonnes uranium. In addition it maybe possible to produce up to 5 tonnes uranium and 100 tonnes thorium from the beach sand industry on an annual basis. (author)

  7. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Western Samoa

    International Nuclear Information System (INIS)

    1977-12-01

    Western Samoa consists principally of two large islands with seven other smaller ones, five of which are uninhabited. No concrete geologic description could be found, but on the basis of a volcanic origin for some of the islands a category 1 uranium potential is assigned. There is no mining industry, and no government agency appears to have a geologic department. (author)

  8. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Denmark (Greenland)

    International Nuclear Information System (INIS)

    1977-11-01

    The report deals almost exclusively with Greenland. A major omission is any broad description of the geology of the island. One which can be recommended is 'A survey of the economic geology of Greenland' by B.J. Nielsen published by the Geological Survey of Greenland. Nielsen has also published several articles on the uranium occurrences in Greenland, some of which are noted in the references. A review of the geology is necessary in order to determine how the known occurrences fit into the pattern of uranium mineralisation in the North Atlantic regions and Canada, and to suggest further potential by analogy with these regions. Maps are significantly also lacking and three suitable examples are attached. Additions to the general map would be the areas examined and the extent of airborne radiometry. A further major omission is a definition of the meaning of potential resources, especially as 250,000 tonnes are claimed for the lujavrites at present and a future potential of 500,000 tonnes. I presume that this is the contained uranium which can be calculated as being present in the rock units, rather than any estimate of the amount of uranium which could be recovered economically. The figures for RAH and EAR at Kvanefjeld could conveniently be updated (Nov. 77) to RAH 15,750 t U, EAR 10,000 t U, TOTAL 25,750 t U. As these alkalic rocks are confined to the Garder province of the Ketilidian mobile belt some more definite indication of similar uraniferous types could be made from the excellent published maps and lead to more realistic estimates using the NURE formulae

  9. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Solomon Islands

    International Nuclear Information System (INIS)

    1977-12-01

    The Solomon Islands have an area of about 30,000 square kilometers. The larger islands are volcanic and contain a small variety of minerals, some of which may eventually be economically recoverable. A large phosphate deposit may also be mined at some future date. Specific geologic information is very difficult to find, but on the basis of what little is available a small potential is deduced to be in Category 2 (l,000 - 10,000 tonnes U). (author

  10. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Costa Rica

    International Nuclear Information System (INIS)

    1977-08-01

    Most parts of Costa Rica, except for the Quaternary volcanic belt, have neither been studied or mapped in detail. Concerning past exploration limited uranium exploration took place in the late 1960's but details are lacking. No additional information is available. A bibliography of Costa Rican geology (Dengo, 19t>2a) and the metallogenic map of Central America (1CAITI, 1970) do not report any uranium occurrences. Data on current exploration activities for uranium are lacking. Mining is essentially regulated by a 1953 code and a 1964 supplement, but the production and use of radioactive materials are controlled by the Costa Rican Atomic Energy Commission. New raining and petroleum laws reportedly are being considered. Mining rights are available with few restrictions to foreign nationals and corporations. Costa Rica contains no rocks older than Cretaceous. The Mesozoic continental clastic sequences of Honduras and northern Nicaragua do not extend this far south. The massive intrusions of acidic granites and syenites in the Talamanca ranges are probably older than the oldest formations now seen adjacent to them and could not have contributed to their mineralization except through weathering. There may be a faint possibility for uranium deposition in lodes and fracture zones within the granitic rocks, but no such deposits have been reported. Insofar as the sediments are concerned, only the shallow water faces of the marine sediments of the Caribbean coastal region offer the remotest possibilities. The uranium potential of Costa Rica is estimated, at less than 1,000 tonnes

  11. International Uranium Resources Evaluation Project (IUREP) national favourability studies: New Caledonia

    International Nuclear Information System (INIS)

    1977-12-01

    New Caledonia is an island and with dependencies totals just over 1900 square kilometers in area and contains an estimated 128,000 people. Its principal products are nickel and chrome, but agricultural products assume considerable importance in addition. Geologically New Caledonia is quite complex, and on the basis of the complexity of geology and the relative intensity of the mineralization of the island as well as apparent favourable host rocks a category 2 - 1,000 - 10,000 tonnes U - (nearer to 1,000 than 10,000) is assigned. (author)

  12. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Fiji Islands

    International Nuclear Information System (INIS)

    1977-12-01

    The Fiji Islands, comprising over 300 islands, with a total area of 18,700 square kilometers are basically either volcanic or coral. A small mining industry exists, however, and on the basis of that fact, and without geologic support of any kind a Category 1 (0 to 1,000 tonnes U) uranium potential has been assigned. (author)

  13. International Uranium Resources Evaluation Project (IUREP) national favourability studies: French Polynesia

    International Nuclear Information System (INIS)

    1977-12-01

    French Polynesia comprises several district groups of islands in the South Pacific having a total population of 134,000 and an area of 5000 square kilometers. The high islands are commonly volcanic in origin while the lower islands are generally coral. They lie in the Tropic zone and are generally warm. Rainfall ranges from a few centimeters per year to as much as 1000. Because of their volcanic or coral origins, the islands of French Polynesia are not considered to have a uranium potential. (author)

  14. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  15. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  16. International Uranium Resources Evaluation Project (IUREP) orientation phase mission summary report: Thailand

    International Nuclear Information System (INIS)

    1985-01-01

    The IURBP Orientation Phase Mission assesses the Speculative Uranium Resources in Thailand to be within the range of 1 500 to 38 500 tonnes U. Geological environments which are considered by the Mission to be favourable for uranium occurrences include the following: sandstones of Jurassic to Triassic age; Tertiary sedimentary basins (northern Thailand); Tertiary sedimentary basins (southern Thailand); associated with fluorite deposits; granitic rocks; black shales and graphitic slates of the Palaeozoic; associated with sedimentary phosphate deposits; and associated with monazite sands. Physical conditions in Thailand, including a wet tropical climate, dense forest growth and rugged terrain in some areas and relative inaccessibility, make exploration difficult and costly. There is currently no ready accessibility to detailed topographic and geological maps and other basic data. This lack of availability is a severe constraint to systematic exploration. The lack of skilled personnel experienced in uranium studies and the low level of technical support is a serious hindrance to exploration in Thailand. (author)

  17. International Uranium Resources Evaluation Project (IUREP) national favourability studies: United Arab Emirates

    International Nuclear Information System (INIS)

    1977-11-01

    While most of the rocks in the United Arab Emirates are of sedimentary marine origin there are also some granites and metamorphic rock areas. It is understood that Hunting Geology and Geophysics Ltd were contracted in 1975 to carry out a mineral survey over 11,500 square kilometres utilising, among others, gamma-ray spectrometry. The results of this survey are not known. A report in 1974 of a large occurrence of uranium in Fujairah was later discredited but at least two radioactive anomalies are known in the country. The existence of granitic rocks and the appropriate conditions for calcareous duricrust formations may indicate some slight potential for uranium. The Speculative Potential may be in the 1000 to 10,000 tonnes uranium category. (author)

  18. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Yemen Arab Republic

    International Nuclear Information System (INIS)

    1977-11-01

    The Yemen Arab Republic occupies a part of the southern Arabian Shield and has been subject to considerable faulting and movement. As far as is known no uranium exploration has ever been undertaken or is presently contemplated in the country. Uranium could occur in the Shield rocks and conditions are right for calcrete type uranium deposits. The Speculative Potential may be in category 2, i.e. between 1000 and 10,000 tonnes uranium. (author)

  19. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Papua New Guinea

    International Nuclear Information System (INIS)

    1977-08-01

    No uranium mineralisation has been identified in Papua New Guinea; there has, however, been virtually no exploitation specifically for uranium. The extensive Mesozoic platform sediments overlying Palaeozoic metamorphic and Permian or Triassic granite basement appear to be the most prospective units for uranium. During the Triassic, fluviatile and marginal marine arkose, feldspathic and volcanic sandstone, and minor reffal limestone were deposited in downfaulted interior and marginal basins of the platform. Locally these sediments are underlain by dacitic volcanics. A new and more widespread phase of shallow marine, deltaic, and fluciatile sedimentation occurred during the Middle and at places also during the Early Jurassic. Arkose and feldspathic and quartzose sandstone are interbedded with a grade laterally into carbonaceous and pyritic shale, and siltstone. By the Late Jurassic the shales had transgressed over the coarse clastics, and marginal marine sandstone, siltstone, and mudstone with some coal beds had been deposited over the larger part of the platform. From Late Jurassic to Late Cretaceous, shales remain the dominant rock type but are intercalated with quartz-feldspar sandstone associated with marine regressions. The Jurassic and Cretaceous shales are source rocks for petroleum. During the Late Cretaceous the northeast part of the platform was uplifted and the Mesozoic cover partly eroded. Sedimentation of fine elastics continued over the edge of the platform and on the continental slope. The Mesozoic sandstones are potential host rocks to uranium mineralisation, particularly where they are interbedded with carbonaceous and pyritic shale. Their potential is enhanced where they are situated near petroleum reservoirs which could have provided hydrogen sulphide or hydrocarbons capable of precipitating uranium from circulating solutions by reduction. Triassic and Jurassic coarse clastics, which are restricted to a few areas, are considered to be the most prospective rocks. The Permian or Triassic granite and Triassic acidic volcanics are possible source rocks for uranium in the Mesozoic sediments, although the uranium levels are unknown. Granitic rocks of similar age, exposed in the western part of Irian Jaya (Rirdshead) are accompanied by radiometric anomalies and are known to contain monazite, allanite, xenotime, zircon, and thorite. Miocene and younger intrusions - principally diorite, tonalite, and granodiorite - in the central range, contain up to 4 ppm U and 16 ppm Th, while Tertiary intrusives in New Britain and the Solomon Islands contain less than 2.5 ppm U and 7 ppm Th. Quaternary volcanics in New Britain and on islands off the North New Guinea coast have low levels of U and Th similar to those of the Tertiary intrusives in the area. Some of the tertiary limestone deposits in Papua New Guinea could be potential host rocks to uranium. The most favourable rock unit is Miocene basinal limestone on the platform; it consists of argillaceous micrite and biomicrite, and calcareous mudstone, and is a source and (locally) a reservoir rock of petroleum. Apart, from the inherent difficulties of exploration of a remote region an added problem is the difficulty of airborne surveying in areas of rugged topography and terrain covered by dense forest. In lowland areas there are the additional problems of permanent water cover, leaching of the surface rocks, and heavy soil cover

  20. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Democratic Kampuchea (Cambodia)

    International Nuclear Information System (INIS)

    1977-10-01

    The potential for uranium deposits appears to be poor in Cambodia. It is largely alluvium. Uranium may occur in discordant deposits in metamorphics and intrusives in the Cardamon and Elephant Hills in the south, and in placers of U/TH minerals in the delta or banks of the Mekong River. The potential is in category 1 (less than 1000 tonnes U ). (author)

  1. Project evaluation: one framework - four approaches

    DEFF Research Database (Denmark)

    Rode, Anna Le Gerstrøm; Svejvig, Per

    . Introducing a framework that can help structure such evaluations, the aim of this paper is to contribute to project theory and practice by inspiring project researchers and aiding project workers in their efforts to open up the black box of projects and deliver relevant and valuable results......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on projects as well as normative arguments focusing on developing prescriptive knowledge of project management. Despite the need for effective...... project management and research methods that can assess effective project management methodologies, extant literature on evaluation procedures or guidelines on how to evaluate projects and/or project management is scarce. To address this challenge, this paper introduces an evaluation framework consisting...

  2. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  3. The DLESE Evaluation Toolkit Project

    Science.gov (United States)

    Buhr, S. M.; Barker, L. J.; Marlino, M.

    2002-12-01

    The Evaluation Toolkit and Community project is a new Digital Library for Earth System Education (DLESE) collection designed to raise awareness of project evaluation within the geoscience education community, and to enable principal investigators, teachers, and evaluators to implement project evaluation more readily. This new resource is grounded in the needs of geoscience educators, and will provide a virtual home for a geoscience education evaluation community. The goals of the project are to 1) provide a robust collection of evaluation resources useful for Earth systems educators, 2) establish a forum and community for evaluation dialogue within DLESE, and 3) disseminate the resources through the DLESE infrastructure and through professional society workshops and proceedings. Collaboration and expertise in education, geoscience and evaluation are necessary if we are to conduct the best possible geoscience education. The Toolkit allows users to engage in evaluation at whichever level best suits their needs, get more evaluation professional development if desired, and access the expertise of other segments of the community. To date, a test web site has been built and populated, initial community feedback from the DLESE and broader community is being garnered, and we have begun to heighten awareness of geoscience education evaluation within our community. The web site contains features that allow users to access professional development about evaluation, search and find evaluation resources, submit resources, find or offer evaluation services, sign up for upcoming workshops, take the user survey, and submit calendar items. The evaluation resource matrix currently contains resources that have met our initial review. The resources are currently organized by type; they will become searchable on multiple dimensions of project type, audience, objectives and evaluation resource type as efforts to develop a collection-specific search engine mature. The peer review

  4. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Federal Republic of Germany

    International Nuclear Information System (INIS)

    1977-10-01

    The Federal Republic of Germany is situated in Central Europe. It covers an area of 250,000 square kilometres and has a population of 60 millions. The Federal Republic consists of 10 individual states. The capital of the country is Bonn. The northern and northwestern parts of the country are formed of flat lowlands, the Norddeutsche Tiefebene. Towards the south follow hilly and mountainous regions with elevations not exceeding 1000 m. In the southwestern and southeastern regions the elevations may reach 1500m in the Black Forest and Bayerischer Wald. The foreland of the Alps and the northern part of the Alps itself with elevations close to 3000 m make up the southern part of the Federal Republic. The main rivers - Rhine, Weser and Elbe - are directed towards northwest and drain the country to the North Sea. Only the southern part is drained by the southeast running river Danube. The climate is moderate, generally with frequent snow during the winter season and warm periods during the summer. The precipitation is distributed uniformly throughout the year. Due to the high industrialization a dense network of railroads, highways and motorroads exists.According to what is geologically known about the country, the chances for the discovery of large quantities of low-coast uranium resources must be considered to be limited. The potential for new discoveries of those deposits can be estimated to be around 10 000 t U. The potential for very low-grade uranium ore, such as granites, low-grade sedimentary rocks (sandstones, shales) can be estimated to range between 10,000 - 50,000 t U or possibly more taking into account very low-grade concentrations in shales. This material is not mineable under present conditions. Environmental considerations may prevent mining in the future

  5. International Uranium Resources Evaluation Project (IUREP) national favourability studies: People's Republic of Mongolia

    International Nuclear Information System (INIS)

    1977-12-01

    Mongolia, a country of 1,525,000 square kilometers, and a population of almost the same number of people is land locked between China and USSR. Historically it's closest ties have been with China, but it is now more closely associated with USSR. Geologically it's complex - most exposed formations are younger than PreCambrian although old exist. Potential for uranium is considered fairly good because the fairly complex geology appears to be favourable both for continental sandstone type deposits and calcretes (less than 50%) and vein type, and other deposits (more than 50$). Considerable effort should be made to obtain additional information related to Mongolian geology. (author)

  6. International Uranium Resources Evaluation Project (IUREP) national favourability studies: People's Republic of China

    International Nuclear Information System (INIS)

    1977-10-01

    China with an area close to 10,000,000 sq km and a fifth of the world's population, has a history of mining and, in fact is quite self sufficient in most of it's needs for the more basic mineral products.However, there is a dearth of knowledge of its resources of uranium. One can however, make the assumption that geologically, there are probably several areas that contain the combination of favourable host rocks and source. The speculative potential of China is estimated to be in Category 5, 100,000 to 500,000 tonnes U. (author)

  7. International Uranium Resources Evaluation Project (IUREP) national favourability studies: Belize (Former British Honduras)

    International Nuclear Information System (INIS)

    1977-08-01

    Belize is a well-forested area of 22,960 square kilometers. Its capital is Belmopan. The country is generally flat north of the capital city. The flat, swampy Caribbean Coast of Belize gradually ascends to the low peaks of the Maya and Cockscomb Mountains (elevation to 1,120 meters). The area south of the Maya Mountains is much more rugged than the area to the north. The country is drained by seventeen rivers, the chief ones being the Belize, Hondo, New, Sibun, Monkey and Moho. There is 'hurricane danger in the July-October period. Belize has reportedly been surveyed by Gamma Ray Spectrometer for phosphates which probably would have contained sufficient uranium to be detectable. The survey traversed about 1,000 line kms along major north-south and east-west roads as well as many secondary roads and trails. The uranium readings ranged from 0. to 9.9 ppm with a uranium content of 1-2 ppm in the limestone areas and 2-7 ppm in the alluvium-covered areas. The U/Th ratio varied from 0.11 to 1.65. A recent traverse across the Mountain Pine Ridge batholith gave one reading as high as 36 ppm but the average was about 9-10 ppm. The upper 1000-3000 feet of core and cuttings from nine deep oil wells were checked for phosphates and uranium. Most of the core and cuttings were almost pure limestones. The P 2 0 3 content was less than 0.05 percent and no uranium was detected. It is very doubtful that any significant uranium occurrences will be found in the sediments surrounding the Maya Mountain uplift. However, there is a slight chance that uranium might occur in the granites and pegmatites in the Maya Mountains. The potential of Belize is estimated to be in the less than 1.000 tonnes uranium range, considering the restricted range, of geologic environments encountered there

  8. Transport Project Evaluation

    DEFF Research Database (Denmark)

    Leleur, Steen

    1996-01-01

    Two main project evaluation approaches exist: cost-benefit analysis (CBA) and multi-criteria analysis (MCA). Related to a European road evaluation method (EURET 1.1) and the MCA-method, WARP, the paper proposes a set of so-called segregated investment return rates (SIRR) to integrate advantages...

  9. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  10. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  11. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  12. IT Project Evaluation and Investment Decision

    Institute of Scientific and Technical Information of China (English)

    黄东兵; 张世英

    2004-01-01

    There are many kinds of real options,which are valuable,in each phase of the lifetime of an information technology(IT)project.However,in the current IT investment decision theory,real options that embedded in IT projects are not considered. In this paper, the process of IT project decision and implementation is fully analyzed, the real options that may be embedded in an IT project are identified, and a real option analysis (ROA) method is proposed for evaluation of an IT project under uncertain business environment. ROA employs Black-Scholes expansion model and cancels the assumption that the cost of project is certain. The numerical example manifests that the ROA can better evaluate IT project and select the IT investment alternative. Finally, a road map is provided to help selecting the suitable evaluation method to make IT investment decision.

  13. Creating Robust Evaluation of ATE Projects

    Science.gov (United States)

    Eddy, Pamela L.

    2017-01-01

    Funded grant projects all involve some form of evaluation, and Advanced Technological Education (ATE) grants are no exception. Program evaluation serves as a critical component not only for evaluating if a project has met its intended and desired outcomes, but the evaluation process is also a central feature of the grant application itself.…

  14. Evaluation of microfinance projects.

    Science.gov (United States)

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  15. Uranium resource evaluation project quality assurance evaluation

    International Nuclear Information System (INIS)

    Grimes, J.G.

    1981-01-01

    This evaluation was conducted over an eight-month period from February 4 through October 1, 1980. During this time, field sampling was suspended for an indefinite time period while the National Uranium Resource Evaluation (NURE) Program underwent restructuring. In addition, the Uranium Resource Evaluation (URE) Project archives are being restructured. Since it is difficult to evaluate quality assurance needs of a program that is undergoing drastic change and because sections of the evaluation were well along before these changes were announced, this evaluation reflects the situation as it was during February 1980. The following quality assurance related programs are continuing to date: (1) periodic checks of field sampling procedures by the Supervising Field Geologist and the Director of Field Operations; (2) verification of field form information and laboratory analytical data verification for all geochemical surveys; (3) URE Project laboratory quality control program (all elements routinely analyzed); and (4) Ames interlaboratory quality control program (uranium only). UCC-ND was given the responsibility of conducting a Hydrogeochemical and Stream Sediment Reconnaissance (HSSR) survey in the Central United States (Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Nebraska, North Dakota, Oklahoma, Texas, South Dakota, and Wisconsin). During 1979 and 1980, 13 detailed surveys were conducted by the URE Project in the Central and Western United States to characterize the hydrogeochemistry, stream sediment geochemistry, and/or radiometric patterns of known or potential uranium occurrences. Beginning in 1980, the HSSR surveys were modified to the Regional Hydrogeochemical and Stream Sediment (RHSS) surveys

  16. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  17. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  18. Project CAREER/CAN. Final Evaluation Report.

    Science.gov (United States)

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  19. 5 CFR 470.317 - Project evaluation.

    Science.gov (United States)

    2010-01-01

    ... law and/or regulation should be considered or proposed. Where the project plan provides for agency... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration...

  20. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. GEAR UP Aspirations Project Evaluation

    Science.gov (United States)

    Trimble, Brad A.

    2013-01-01

    The purpose of this study was to conduct a formative evaluation of the first two years of the Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP) Aspirations Project (Aspirations) using a Context, Input, Process, and Product (CIPP) model so as to gain an in-depth understanding of the project during the middle school…

  2. Stakeholder approach for evaluating organizational change projects.

    Science.gov (United States)

    Peltokorpi, Antti; Alho, Antti; Kujala, Jaakko; Aitamurto, Johanna; Parvinen, Petri

    2008-01-01

    This paper aims to create a model for evaluating organizational change initiatives from a stakeholder resistance viewpoint. The paper presents a model to evaluate change projects and their expected benefits. Factors affecting the challenge to implement change were defined based on stakeholder theory literature. The authors test the model's practical validity for screening change initiatives to improve operating room productivity. Change initiatives can be evaluated using six factors: the effect of the planned intervention on stakeholders' actions and position; stakeholders' capability to influence the project's implementation; motivation to participate; capability to change; change complexity; and management capability. The presented model's generalizability should be explored by filtering presented factors through a larger number of historical cases operating in different healthcare contexts. The link between stakeholders, the change challenge and the outcomes of change projects needs to be empirically tested. The proposed model can be used to prioritize change projects, manage stakeholder resistance and establish a better organizational and professional competence for managing healthcare organization change projects. New insights into existing stakeholder-related understanding of change project successes are provided.

  3. Project SEARCH UK--Evaluating Its Employment Outcomes

    Science.gov (United States)

    Kaehne, Axel

    2016-01-01

    Background: The study reports the findings of an evaluation of Project SEARCH UK. The programme develops internships for young people with intellectual disabilities who are about to leave school or college. The aim of the evaluation was to investigate at what rate Project SEARCH provided employment opportunities to participants. Methods: The…

  4. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-09-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR’06 are highlighted, and the future of the two projects is discussed.

  5. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR-06 are highlighted, and the future of the two projects is discussed

  6. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  7. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  8. Criticality safety benchmark evaluation project: Recovering the past

    Energy Technology Data Exchange (ETDEWEB)

    Trumble, E.F.

    1997-06-01

    A very brief summary of the Criticality Safety Benchmark Evaluation Project of the Westinghouse Savannah River Company is provided in this paper. The purpose of the project is to provide a source of evaluated criticality safety experiments in an easily usable format. Another project goal is to search for any experiments that may have been lost or contain discrepancies, and to determine if they can be used. Results of evaluated experiments are being published as US DOE handbooks.

  9. Workforce development and effective evaluation of projects.

    Science.gov (United States)

    Dickerson, Claire; Green, Tess; Blass, Eddie

    The success of a project or programme is typically determined in relation to outputs. However, there is a commitment among UK public services to spending public funds efficiently and on activities that provide the greatest benefit to society. Skills for Health recognised the need for a tool to manage the complex process of evaluating project benefits. An integrated evaluation framework was developed to help practitioners identify, describe, measure and evaluate the benefits of workforce development projects. Practitioners tested the framework on projects within three NHS trusts and provided valuable feedback to support its development. The prospective approach taken to identify benefits and collect baseline data to support evaluation was positively received and the clarity and completeness of the framework, as well as the relevance of the questions, were commended. Users reported that the framework was difficult to complete; an online version could be developed, which might help to improve usability. Effective implementation of this approach will depend on the quality and usability of the framework, the willingness of organisations to implement it, and the presence or establishment of an effective change management culture.

  10. Equitable Financial Evaluation Method for Public-Private Partnership Projects

    Institute of Scientific and Technical Information of China (English)

    KE Yongjian; LIU Xinping; WANG Shouqing

    2008-01-01

    The feasibility study of a public-private partnership (PPP) project is regarded as one of the critical factors for successful implementation,but unfortunately the common financial evaluation methods currently used only represent the benefits of the private sector.There is,therefore,an urgent need to develop an equitable financial evaluation method for PPP projects.This paper presents a comprehensive literature review that examines international practices.An equitable financial evaluation method was then developed taking into account the inherent characteristics of PPP projects using six separate indicators and Monte Carlo simulations.The result for a bridge project in Romania shows that the method combines the viewpoints of all the relevant stakeholders to achieve an equitable financial evaluation of PPP projects.

  11. International Uranium Resources Evaluation Project (IUREP) national favourability studies: People's Democratic Republic of Yemen (ADEN)

    International Nuclear Information System (INIS)

    1977-10-01

    The Arabian Shield forms the western part of the country and is composed of Precambrian metasediments of undescribed composition. The literature mentions calcareous duricrust formations in the eastern desert part of the country. This juxtaposition of possible source and duricrust is very similar to Somalia and leads to the view that the Speculative Potential may be in the 1000 to 10,000 tonnes uranium category. (author)

  12. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  13. Uncertainties in Transport Project Evaluation: Editorial

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Nielsen, Otto Anker

    2015-01-01

    University of Denmark, September 2013. The conference was held under the auspices of the project ‘Uncertainties in transport project evaluation’ (UNITE) which is a research project (2009-2014) financed by the Danish Strategic Research Agency. UNITE was coordinated by the Department of Transport......This following special issue of the European Journal of Transport Infrastructure Research (EJTIR) containing five scientific papers is the result of an open call for papers at the 1st International Conference on Uncertainties in Transport Project Evaluation that took place at the Technical...

  14. Research on evaluation of enterprise project culture based on Denison model

    Directory of Open Access Journals (Sweden)

    Yucheng Zeng

    2015-05-01

    Full Text Available Purpose: The purpose of this paper is to build enterprise project culture evaluation model and search for the best evaluation method for Chinese enterprise project culture on the basis of studying and drawing lessons from enterprise culture evaluation theory and method at home and abroad. Design/methodology/approach: Referring to the Denison enterprise culture evaluation model, this paper optimizes it according to the difference of enterprise project culture, designs the enterprise project culture evaluation model and proves the practicability of the model through empirical. Finding: This paper finds that it`s more applicable to use the Denison model for enterprise project culture evaluation through the comparative analysis of domestic and foreign enterprise culture evaluation theory and method, the systematic project culture management framework of Chinese enterprises has not yet formed through empirical research, and four factors in enterprise project culture have important influence on project operation performance improvement. Research limitations/implications: The research on evaluation of enterprise project culture based on Denison model is a preliminary attempt, the design of evaluation index system, evaluation model and scale structure also need to be improved, but the thinking of this paper in this field provides a valuable reference for future research. Practical Implications: This paper provides the support of theory and practice for evaluating the present situation of enterprise project culture construction and analyzing the advantages and disadvantages of project culture, which contributes to the "dialectical therapy" of enterprise project management, enterprise management and enterprise project culture construction. Originality/value: The main contribution of this paper is the introduction of Denison enterprise culture model. Combining with the actual situation of enterprises, this paper also builds the evaluation model for

  15. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  16. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  17. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  18. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  19. Survey of an evaluation method for research and development projects; Kenkyu kaihatsu project no hyoka shuho ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report describes an interim evaluation method and a concrete evaluation method for projects promoted by the Agency of Industrial Science and Technology, and NEDO. As a result of the survey, a method of highly practical interim evaluation, concrete evaluation items, and evaluation criteria have been proposed by assuming that the projects are evaluated by the project evaluation department independent of the project promotion department. Long-term issues for constructing the evaluation system are also described. It is the most essential for the evaluation to fulfill the function of effective promotion of the following projects. It is also indispensable for the evaluation method and issues proposed in this report to communicate closely to project promoters and researchers, and to reassess the projects continuously. Continuous consideration for the feedback of evaluation process and the improvement of evaluation are significant for the long-term construction of system. 21 refs., 9 figs., 23 tabs.

  20. Evaluating miscible flood projects for acquisition or viability

    International Nuclear Information System (INIS)

    Cassinat, J.C.

    1991-01-01

    Very little information exists regarding evaluating enhanced oil recovery (EOR) projects, in particular miscible floods. Due to the size and scope of most tertiary recovery projects, standard evaluation rules and techniques are too general and vague to adequately model these schemes. A procedure for identifying the risks associated with miscible EOR projects is presented. It is essential to set up a cash flow model that accurately represents the future performance of a miscible flood. Included in the model are the timing of crucial events such as expected solvent breakthrough and the injection of trace gas. The cash flow analysis allows a quick audit procedure and converts production into a monetary or economic evaluation criteria that can easily be compared to other investment alternatives. When evaluating a miscible flood project, forecasting production, solvent and chase gas recovery costs can become quite complex. An organized procedure for an evaluation will ensure that a comprehensive and thorough examination of all the data is completed, and will increase confidence levels associated with decision making. 32 refs., 4 figs., 4 tabs

  1. Evaluation of Service Station Attendant-Auto Care Project.

    Science.gov (United States)

    Cress, Ronald J.

    The project described offers an approach to providing occupational skills to socially and educationally handicapped youth, specifically the skills necessary for a service station attendant in driveway salesmanship and auto care. The 10-page evaluation report presents project goals and objectives with evaluation data (represented graphically) and…

  2. Comprehensive Evaluation of Large Infrastructure Project Plan with ANP

    Institute of Scientific and Technical Information of China (English)

    HAN Chuan-feng; CHEN Jian-ye

    2005-01-01

    Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. A model including social economy, ecological environment, and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.

  3. Evaluation of the pilot procurement project in Germany

    International Nuclear Information System (INIS)

    Ostertag, Katrin

    2003-01-01

    Energy+ represents a European cooperative procurement initiative which aims at increasing the market share of highly energy-efficient cold appliances. Three years after its start, the project was recently evaluated in Germany. This paper discusses the main evaluation results and their implications for the project's further development. It covers the impacts of Energy+ on technology development and the commercial importance of the targeted appliances. Due to the project's relatively recent start, however, the main focus of the evaluation lies on the procurement process and practical implementation elements. Of particular interest are the specificities of the considered market segment which, in Germany and also in other participating countries, is characterised by highly dispersed consumers and the lack of large institutional buyers as candidates for a buyer group. The project therefore developed a new approach emphasising the role of retail organisations and of marketing activities by the project coordinators. The evaluation discusses several challenges related to this approach. This includes issues concerning the interfaces between international producers, their national branch offices and retailers as well as conflicts between the marketing approaches of producers and retailers, in particular with respect to the use of brand names and trade marks. Further, in Energy+ the communication between users and producers, an essential innovative element of cooperative procurement, cannot take its usual role, since consumers are not directly involved in the process. The paper shows how the project has dealt with these challenges and provides recommendations for the future project design

  4. Evaluation of rubber modified asphalt demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    As part of the Ontario Government's medium-term scrap tire management strategy, 11 rubber modified asphalt demonstration projects were funded or completed, with 13 additional projects from small to large (1,500-65,000 passenger tire equivalents) approved for the 1993 paving season. This report presents the results of an August to November 1993 study of the 11 demonstration projects. The evaluation included a description of the technology; technical review of the projects; economic analysis; review of the environmental literature; environmental review of the projects; comparison of the projects with similar ones in other jurisdictions; and recommendations. Detailed information on asphalt technology is included in an appendix.

  5. A critical evaluation of the STRATEGY project

    DEFF Research Database (Denmark)

    Howard, B.J.; Liland, A.; Beresford, N.A.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management...... of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried...... out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated....

  6. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B. J.; Liland, A.; Beresford, N. A.; Andersson, K. G.; Cox, G.; Gil, J. M.; Hunt, J.; Nisbet, A.; Oughton, D. H.; Voigt, G.

    2004-01-01

    The STRATEGY project (sustainable restoration and long-term management of contaminated rural, urban and industrial ecosystems; www.strategy-ec.org.uk) addressed the need for a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project considered both technical and social aspects of implementing restoration strategies for urban and rural environments. The importance of considering socially relevant objectives in addition to the dose reduction was emphasised. A critical evaluation was carried out on 101 selected countermeasures, (including rural waste disposal options), a model was developed to aid optimising countermeasure strategies and a method of carrying out participatory decision-making suggested. The outputs of the project are described and critically evaluated. (authors)

  7. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  8. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  9. Project Aprendizaje. Final Evaluation Report 1992-93.

    Science.gov (United States)

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  10. The Jeff evaluated nuclear data project

    Energy Technology Data Exchange (ETDEWEB)

    Koning, A.J.; Duijvestijn, M.C.; Hogenbirk, A.; Van der Marck, S.C.; Avrigeanu, M.; Avrigeanu, V.; Batistoni, P.; Pillon, M.; Bauge, E.; Bersillon, O.; Dos-Santos-Uzarralde, P.; Lopez Jimenez, M.J.; Morillon, B.; Romain, P.; Be, M.M.; Duchemin, B.; Huynh, T.D.; Jouanne, C.; Mounier, C.; Bem, P.; Bernard, D.; Bouland, O.; Courcelle, A.; Dupont, E.; Jacqmin, R.; Litaize, O.; Noguere, G.; Saint Jean, C. de; Santamarina, A.; Serot, O.; Sublet, J.Ch.; Bidaud, A.; Dean, C.J.; Perry, R.J.; Duhamel, I.; Nouri, A.; Gunsing, F.; Ridikas, D.; Fischer, U.; Leichtle, D.; Pereslavtsev, P.; Simakov, S.; Forrest, R.A.; Haeck, W.; Henriksson, H.; Kodeli, I.; Nordborg, C.; Rugama, Y.; Sartori, E.; Keinert, J.; Mattes, M.; Kellett, M.A.; Nichols, A.L.; Kopecky, J.; Leeb, H.; Leppanen, J.; Menapace, E.; Pescarini, M.; Mills, R.W.; Perel, R.L.; Plompen, A.J.M.; Rullhusen, P.; Seidel, K.; Tagesen, S.; Vonach, H.; Trkov, A

    2008-07-01

    The status of the Joint Evaluated Fission and Fusion file (JEFF) is described. JEFF-3.1 comprises a significant update of actinide evaluations, materials evaluations that have emerged from various European nuclear data projects, the activation library JEFF-3.1/A, the decay data and fission yield sub-libraries, and fusion-related data files from the EFF project. The revisions were motivated by the availability of new measurements, modelling capabilities and trends from integral experiments. Validations have been performed, mainly for criticality, reactivity temperature coefficients, fuel inventory and shielding of thermal and fast systems. Compared with earlier releases, JEFF-3.1 provides improved performance with respect to a variety of scientific and industrial applications. Following on from the public release of JEFF-3.1, the French nuclear power industry has selected this suite of nuclear applications libraries for inclusion in their production codes. (authors)

  11. The Jeff evaluated nuclear data project

    International Nuclear Information System (INIS)

    Koning, A.J.; Duijvestijn, M.C.; Hogenbirk, A.; Van der Marck, S.C.; Avrigeanu, M.; Avrigeanu, V.; Batistoni, P.; Pillon, M.; Bauge, E.; Bersillon, O.; Dos-Santos-Uzarralde, P.; Lopez Jimenez, M.J.; Morillon, B.; Romain, P.; Be, M.M.; Duchemin, B.; Huynh, T.D.; Jouanne, C.; Mounier, C.; Bem, P.; Bernard, D.; Bouland, O.; Courcelle, A.; Dupont, E.; Jacqmin, R.; Litaize, O.; Noguere, G.; Saint Jean, C. de; Santamarina, A.; Serot, O.; Sublet, J.Ch.; Bidaud, A.; Dean, C.J.; Perry, R.J.; Duhamel, I.; Nouri, A.; Gunsing, F.; Ridikas, D.; Fischer, U.; Leichtle, D.; Pereslavtsev, P.; Simakov, S.; Forrest, R.A.; Haeck, W.; Henriksson, H.; Kodeli, I.; Nordborg, C.; Rugama, Y.; Sartori, E.; Keinert, J.; Mattes, M.; Kellett, M.A.; Nichols, A.L.; Kopecky, J.; Leeb, H.; Leppanen, J.; Menapace, E.; Pescarini, M.; Mills, R.W.; Perel, R.L.; Plompen, A.J.M.; Rullhusen, P.; Seidel, K.; Tagesen, S.; Vonach, H.; Trkov, A.

    2008-01-01

    The status of the Joint Evaluated Fission and Fusion file (JEFF) is described. JEFF-3.1 comprises a significant update of actinide evaluations, materials evaluations that have emerged from various European nuclear data projects, the activation library JEFF-3.1/A, the decay data and fission yield sub-libraries, and fusion-related data files from the EFF project. The revisions were motivated by the availability of new measurements, modelling capabilities and trends from integral experiments. Validations have been performed, mainly for criticality, reactivity temperature coefficients, fuel inventory and shielding of thermal and fast systems. Compared with earlier releases, JEFF-3.1 provides improved performance with respect to a variety of scientific and industrial applications. Following on from the public release of JEFF-3.1, the French nuclear power industry has selected this suite of nuclear applications libraries for inclusion in their production codes. (authors)

  12. Undiscovered resource evaluation: Towards applying a systematic approach to uranium

    International Nuclear Information System (INIS)

    Fairclough, M.; Katona, L.

    2014-01-01

    Evaluations of potential mineral resource supply range from spatial to aspatial, and everything in between across a range of scales. They also range from qualitative to quantitative with similar hybrid examples across the spectrum. These can compromise detailed deposit-specific reserve and resource calculations, target generative processes and estimates of potential endowments in a broad geographic or geological area. All are estimates until the ore has been discovered and extracted. Contemporary national or provincial scale evaluations of mineral potential are relatively advanced and some include uranium, such as those for South Australia undertaken by the State Geological Survey. These play an important role in land-use planning as well as attracting exploration investment and range from datato knowledge-driven approaches. Studies have been undertaken for the Mt Painter region, as well as for adjacent basins. The process of estimating large-scale potential mineral endowments is critical for national and international planning purposes but is a relatively recent and less common undertaking. In many cases, except at a general level, the data and knowledge for a relatively immature terrain is lacking, requiring assessment by analogy with other areas. Commencing in the 1980s, the United States Geological Survey, and subsequently the Geological Survey of Canada evaluated a range of commodities ranging from copper to hydrocarbons with a view to security of supply. They developed innovative approaches to, as far as practical, reduce the uncertainty and maximise the reproducibility of the calculations in information-poor regions. Yet the approach to uranium was relatively ad hoc and incomplete (such as the US Department of Energy NURE project). Other historic attempts, such as the IAEA-NEA International Uranium Resource Evaluation Project (IUREP) in the 1970s, were mainly qualitative. While there is still no systematic global evaluation of undiscovered uranium resources

  13. Monitoring the effectiveness evaluation of investment projects

    Directory of Open Access Journals (Sweden)

    Skopin Alex O.

    2012-02-01

    Full Text Available The article raised the question of monitoring regulatory evaluation of the effectiveness of regional investment projects. This is justified by the fact that the current regulatory framework defined indicators for measuring the effectiveness of regional investment projects, but these figures are usually used only at the design stage of the project, an interim assessment of the effectiveness of a sufficiently simplified and based on the level of exploration investment.

  14. Economic Evaluation Methodology Review on KAERI's Recent Projects

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jin Sam; Kim, Jee Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    In technology utilization, economics evaluation is helpful to R and D program managers by giving them economic information needed to improve the usefulness of their projects. Moreover it can help them to communicate to others participants keeping all of them value-oriented minded through the whole development process. In this context, KAERI(Korea Atomic Energy Research Institute) has been performed economic evaluation on recent some projects. So, in this study, it has been made brief reviews on KAERI's economic evaluation methodology to its recent some projects of which evaluation we engage in, especially PEFP(Proton Engineering frontier Project) and SMART(Small Medium advanced ReacTor): Methodology comparison and their pros and cons

  15. Methodology for evaluation of railroad technology research projects

    Science.gov (United States)

    1981-04-01

    This Project memorandum presents a methodology for evaluating railroad research projects. The methodology includes consideration of industry and societal benefits, with special attention given to technical risks, implementation considerations, and po...

  16. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))

    1992-01-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  17. Intermediate evaluation of USAID/Cairo energy policy planning project

    Energy Technology Data Exchange (ETDEWEB)

    Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)

    1992-09-01

    Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.

  18. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  19. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.

  20. International Uranium Resources Evaluation Project (IUREP) orientation phase mission report: Uganda. Draft. November 1982 - January 1983

    International Nuclear Information System (INIS)

    Trey, Michel de; Levich, Robert A.

    1983-02-01

    At present, there are no reasonably assured resources of uranium in Uganda in any price category. Speculative resources are restricted to 2,400 metric tons of uranium in an apatite deposit, which in the past has been actively mined for phosphate. The possible recovery of this uranium is dependent upon a number of economic and technological conditions which have never been thoroughly studied. Although the geology of Uganda holds some interesting possibilities for hosting uranium deposits, the studies conducted between 1949 and 1979 were limited to known radioactive occurrences and anomalies in limited areas which had little economic significance. Vast areas, less known and less accessible were completely ignored. Uranium exploration must therefore be started again in a systematic manner using modern methods. The current economic situation in Uganda is so critical that International technical and financial assistance is vitally needed to help rehabilitate the Geological Survey and Mines Department. Uganda currently can offer only very restricted services. The transportation system is quite deficient: the railway does not presently cross the frontier with Kenya, and all equipment and goods must be transported from Mombasa by road. Housing is in very short supply, and many basic commodities are often unobtainable. Any organization or private company which begins an exploration program in Uganda must plan to import essentially all the equipment and supplies it shall require. It shall also have to construct offices and staff housing, and import and stockpile fuel and staple goods, so as not to be at the mercy of the (at times) inadequate local supplies. It shall most probably also have to provide basic local and imported food to its Ugandan staff and should plan to pay much higher local salaries than is customary. Lastly, it will have to provide its own fleet of trucks and organize its own transport system. (author)

  1. A portfolio evaluation framework for air transportation improvement projects

    Science.gov (United States)

    Baik, Hyeoncheol

    This thesis explores the application of portfolio theory to the Air Transportation System (ATS) improvement. The ATS relies on complexly related resources and different stakeholder groups. Moreover, demand for air travel is significantly increasing relative to capacity of air transportation. In this environment, improving the ATS is challenging. Many projects, which are defined as technologies or initiatives, for improvement have been proposed and some have been demonstrated in practice. However, there is no clear understanding of how well these projects work in different conditions nor of how they interact with each other or with existing systems. These limitations make it difficult to develop good project combinations, or portfolios that maximize improvement. To help address this gap, a framework for identifying good portfolios is proposed. The framework can be applied to individual projects or portfolios of projects. Projects or portfolios are evaluated using four different groups of factors (effectiveness, time-to-implement, scope of applicability, and stakeholder impacts). Portfolios are also evaluated in terms of interaction-determining factors (prerequisites, co-requisites, limiting factors, and amplifying factors) because, while a given project might work well in isolation, interdependencies between projects or with existing systems could result in lower overall performance in combination. Ways to communicate a portfolio to decision makers are also introduced. The framework is unique because (1) it allows using a variety of available data, and (2) it covers diverse benefit metrics. For demonstrating the framework, an application to ground delay management projects serves as a case study. The portfolio evaluation approach introduced in this thesis can aid decision makers and researchers at universities and aviation agencies such as Federal Aviation Administration (FAA), National Aeronautics and Space Administration (NASA), and Department of Defense (DoD), in

  2. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  3. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  4. Projection pursuit water quality evaluation model based on chicken swam algorithm

    Science.gov (United States)

    Hu, Zhe

    2018-03-01

    In view of the uncertainty and ambiguity of each index in water quality evaluation, in order to solve the incompatibility of evaluation results of individual water quality indexes, a projection pursuit model based on chicken swam algorithm is proposed. The projection index function which can reflect the water quality condition is constructed, the chicken group algorithm (CSA) is introduced, the projection index function is optimized, the best projection direction of the projection index function is sought, and the best projection value is obtained to realize the water quality evaluation. The comparison between this method and other methods shows that it is reasonable and feasible to provide decision-making basis for water pollution control in the basin.

  5. Nuclear data project evaluation activity report. October 1998 - October 2000

    Energy Technology Data Exchange (ETDEWEB)

    Akovali, Y; Blackmon, J; Radford, D; Smith, M [Physics Division, Oak Ridge National Laboratory, Oak Ridge, TN (United States)

    2001-02-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report.

  6. Nuclear data project evaluation activity report. October 1998 - October 2000

    International Nuclear Information System (INIS)

    Akovali, Y.; Blackmon, J.; Radford, D.; Smith, M.

    2001-01-01

    This report summarizes the activities of the ORNL Nuclear Data Project since the IAEA Advisory Group meeting in December 1998. The group's future plans are also included. The ORNL Nuclear Data Project's responsibility includes the compilation/evaluation of astrophysics data, as well as the evaluation and compilation of nuclear structure data. The Nuclear Data Project, therefore, is composed of two groups. The Nuclear Data Project staff through September 2000 is listed below. Accomplishments for the period of October 1998 through September 2000 of the nuclear structure data group and the nuclear astrophysics group are submitted in this Nuclear Data Project report

  7. EVALUATION CRITERIA OF INNOVATIVE SOCIAL INVESTMENT PROJECTS IN HEALTH CARE

    Directory of Open Access Journals (Sweden)

    Vadim Aleksandrovich Lomazov

    2013-11-01

    Full Text Available Purpose: analysis of key indicators and creation of evaluation criteria of innovative socio-economic investment projects in healthcare, implemented on the basis of public-private partnerships.Methodology: there has been performed comprehensive assessment of specialized socio-economic projects in health sector taking into consideration interests of participants in the project (public and private, main aspects (medical, social, economic, scientific and innovative, and assessment components (presumable effectiveness or risk during implementation of the project. The degree of relative importance of the factors considered in each level, and the levels themselves are determined by experts with the help of paired comparisons method. The values of the project indicators are estimated against nonuniform grading scale, both the results of direct measurements and expert information being used.Results: There has been suggested an approach and a procedure for evaluating projects based on the allocation of interests, issues and evaluation components of the project as sub-criteria levels of the hierarchy analysis method; there has been developed research prototype of information analysis system for assessment of projects on the basis of the proposed approach.DOI: http://dx.doi.org/10.12731/2218-7405-2013-8-48

  8. Evaluation of Embedded System Component Utilized in Delivery Integrated Design Project Course

    Science.gov (United States)

    Junid, Syed Abdul Mutalib Al; Hussaini, Yusnira; Nazmie Osman, Fairul; Razak, Abdul Hadi Abdul; Idros, Mohd Faizul Md; Karimi Halim, Abdul

    2018-03-01

    This paper reports the evaluation of the embedded system component utilized in delivering the integrated electronic engineering design project course. The evaluation is conducted based on the report project submitted as to fulfil the assessment criteria for the integrated electronic engineering design project course named; engineering system design. Six projects were assessed in this evaluation. The evaluation covers the type of controller, programming language and the number of embedded component utilization as well. From the evaluation, the C-programming based language is the best solution preferred by the students which provide them flexibility in the programming. Moreover, the Analog to Digital converter is intensively used in the projects which include sensors in their proposed design. As a conclusion, in delivering the integrated design project course, the knowledge over the embedded system solution is very important since the high density of the knowledge acquired in accomplishing the project assigned.

  9. CHARACTERISTICS OF MIRR METHOD IN EVALUATION OF INVESTMENT PROJECTS' EFFECTIVENESS

    OpenAIRE

    P. Kukhta

    2014-01-01

    There were analyzed characteristics of the Modified Internal Rate of Return method in the evaluation of investment projects, restrictions connected with its application, advantages and disadvantages compared with indicators of the original Internal Rate of Return and Net Present Value for projects with certain baseline characteristics. It was determined opportunities to adapt the method of Modified Internal Rate of Return to alternative computational approaches of the project cash flows evalu...

  10. Evaluating Stream Restoration Projects: What Do We Learn from Monitoring?

    Directory of Open Access Journals (Sweden)

    Zan Rubin

    2017-02-01

    Full Text Available Two decades since calls for stream restoration projects to be scientifically assessed, most projects are still unevaluated, and conducted evaluations yield ambiguous results. Even after these decades of investigation, do we know how to define and measure success? We systematically reviewed 26 studies of stream restoration projects that used macroinvertebrate indicators to assess the success of habitat heterogeneity restoration projects. All 26 studies were previously included in two meta-analyses that sought to assess whether restoration programs were succeeding. By contrast, our review focuses on the evaluations themselves, and asks what exactly we are measuring and learning from these evaluations. All 26 studies used taxonomic diversity, richness, or abundance of invertebrates as biological measures of success, but none presented explicit arguments why those metrics were relevant measures of success for the restoration projects. Although changes in biodiversity may reflect overall ecological condition at the regional or global scale, in the context of reach-scale habitat restoration, more abundance and diversity may not necessarily be better. While all 26 studies sought to evaluate the biotic response to habitat heterogeneity enhancement projects, about half of the studies (46% explicitly measured habitat alteration, and 31% used visual estimates of grain size or subjectively judged ‘habitat quality’ from protocols ill-suited for the purpose. Although the goal of all 26 projects was to increase habitat heterogeneity, 31% of the studies either sampled only riffles or did not specify the habitats sampled. One-third of the studies (35% used reference ecosystems to define target conditions. After 20 years of stream restoration evaluation, more work remains for the restoration community to identify appropriate measures of success and to coordinate monitoring so that evaluations are at a scale capable of detecting ecosystem change.

  11. Evaluating Development Projects and Programmes in Africa: The ...

    African Journals Online (AJOL)

    evaluation. It is indicated that NEPAD has not prescribed any internal or external monitoring and evaluation of its projects and programmes, and therefore calls into doubt the level of professional competence in its delivery strategies. The article also examines selected monitoring and evaluation strategies such as the African

  12. CHARACTERISTICS OF MIRR METHOD IN EVALUATION OF INVESTMENT PROJECTS' EFFECTIVENESS

    Directory of Open Access Journals (Sweden)

    P. Kukhta

    2014-09-01

    Full Text Available There were analyzed characteristics of the Modified Internal Rate of Return method in the evaluation of investment projects, restrictions connected with its application, advantages and disadvantages compared with indicators of the original Internal Rate of Return and Net Present Value for projects with certain baseline characteristics. It was determined opportunities to adapt the method of Modified Internal Rate of Return to alternative computational approaches of the project cash flows evaluation.

  13. The Second Futamura Projection for Type-Directed Partial Evaluation

    DEFF Research Database (Denmark)

    Grobauer, Bernd; Yang, Zhe

    2001-01-01

    ', syntax-directed partial evaluation and TDPE, this derivation involves several conceptual and technical steps. These include a suitable formulation of the second Futamura projection and techniques for using TDPE to specialize type-indexed programs. In the context of the second Futamura projection, we also...... compare and relate TDPE with conventional offline partial evaluation. We demonstrate our technique with several examples, including compiler generation for Tiny, a prototypical imperative language....

  14. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  15. A method multi criterio to evaluate projects of rural electrification

    International Nuclear Information System (INIS)

    Gonzalez Posse, E.

    1994-01-01

    In this document about the problem of the evaluation projects methodologies in rural electrification.The low analysis problem is of complex nature, because each project is evaluation object and an economic agent. One of these agents identifies different benefits and cost, and also has a different approaches for value them.In consequence, the form in that it is carried out the evaluation of the one project for each one of this agents that it is usually solved for mechanisms linked to the capacity of incidence or of determination of each one of them, this does not assures a satisfactory results for the general interest

  16. Evaluation of Building Projects Using Earned Value Technique ...

    African Journals Online (AJOL)

    This study evaluates building construction projects using the Earned Value Analysis technique, the Experimental Approach, and Value Concept Analysis. The aim was to compare the cost incurred for an identified amount of work done on a project with the cost budgeted for the same work. The results were used to calculate ...

  17. Evaluation of the Higher Education Active Community Fund Project in Bournemouth

    OpenAIRE

    Apostolakis, Christos

    2005-01-01

    This report evaluates the Higher Education Active Community Fund (HEACF) Project from its first year in September 2002 to May 2005.The principle objective of the study was to evaluate the implementation of the HEACF project, its impact and its capacity to achieve the aims during this time. Based on research evidence the HEACF project introduced a holistic and systematic way of organising and developing volunteer activity at Bournemouth University. In addition to this, the project provided an ...

  18. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  19. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  20. Computational methods for planning and evaluating geothermal energy projects

    International Nuclear Information System (INIS)

    Goumas, M.G.; Lygerou, V.A.; Papayannakis, L.E.

    1999-01-01

    In planning, designing and evaluating a geothermal energy project, a number of technical, economic, social and environmental parameters should be considered. The use of computational methods provides a rigorous analysis improving the decision-making process. This article demonstrates the application of decision-making methods developed in operational research for the optimum exploitation of geothermal resources. Two characteristic problems are considered: (1) the economic evaluation of a geothermal energy project under uncertain conditions using a stochastic analysis approach and (2) the evaluation of alternative exploitation schemes for optimum development of a low enthalpy geothermal field using a multicriteria decision-making procedure. (Author)

  1. Evaluation guide for the international reactor physics experiments evaluation project (IRPhEP)

    International Nuclear Information System (INIS)

    Yamaji, Akifumi

    2013-01-01

    At present, there is an urgent need to preserve integral reactor physics experimental data including separate or special effects data for nuclear energy and technology applications and the knowledge and competence contained therein. The International Reactor Physics Evaluation Project (IRPhEP) was initiated as a pilot activity in 1999 by the Organization of Economic Cooperation and Development (OECD) Nuclear Energy Agency (NEA) Nuclear Science Committee (NSC). The project was endorsed as an official activity of the NSC in June of 2003. While coordination and administration of the IRPhEP takes place at an international level, each participating country is responsible for the administration, technical direction, and priorities of the project within their respective countries. This document outlines the general presentation guidelines that evaluators should follow for the description of the experiments and all relevant experimental data in order to ensure the consistency between the evaluations published in the final Handbook. Publication templates will be used to ensure this consistency and will follow the general scheme below: 1 - Experiment identification number; 2- Date; 3 - Name of experiment (Purpose of experiment, Phenomena measured and scope); 4 - Name or designation of experimental programme; 5 - Description of facility; 6 - Description of test or experiment (Experimental configuration, Core life cycle, Experimental limitations or shortcomings); 7 - Phenomena measured (Description of results and analysis, Special features and characteristics of experiment, Measurement systems/methods and uncertainties); 8 - Duplicate or complementary experiments / other related experiments; 9 - Status of completion of the evaluation; 10 - References (pointer to evaluation, archive if available, otherwise generic bibliographic reference); 11 - Authors/ organisers 12 - Material available

  2. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  3. APPROACHES FOR EVALUATING AND FINANCING INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    MARIA-LOREDANA POPESCU

    2011-04-01

    Full Text Available This article presents the financial investment approach and the investment evaluation methods, which are criteria for assessing both investment projects and their funding sources. An important role in the analysis carried out is played by the investment decision and financing decision quality. Making an investment decision implies computing the related investment efficiency indicators. They allow the comparison of several variants of the same investment project as well as their comparison with other projects in the same industry or in other industries. The financing decision concerns the selection between their own sources (share capital, depreciation fund, profits, reserve funds, additional capital, revenues from investments, attracted sources (domestic resource mobilization and borrowed sources (credits.

  4. Project Evaluation under Inflation Condition

    International Nuclear Information System (INIS)

    Hindy, M.; El Missiry, P.

    2004-01-01

    This paper analyzes the role of inflation in capital budgeting and attempts to introduce solutions to such implication in order to make the appropriate decision for the firm' stockholders under these circumstances. Inflation leads to biasness in evaluating the investment projects, due to its impact on the cash flow, the discount rate, the initial investment cost, and the depreciation. This paper has shown that the capital budgeting process is not neutral with respect to inflation, as the output prices will raise as well as the operating and capital expenditures will also be adjusted due to inflation. In addition, it has shown that it is reasonable to expect that the cost of capital will increase as a result of an increase in the real interest rate, the inflation premium, and the cost of equity. Of critical importance is the basis used in calculating the annual depreciation which may lead to the transfer of wealth from the investment projects to the government and will result in underestimating the net present value of the investment projects, if these depreciation charges is calculated based upon the historical values and not on the replacement cost of the fixed assets

  5. Public project success as seen in a broad perspective.: Lessons from a meta-evaluation of 20 infrastructure projects in Norway.

    Science.gov (United States)

    Volden, Gro Holst

    2018-08-01

    Infrastructure projects in developed countries are rarely evaluated ex-post. Despite their number and scope, our knowledge about their various impacts is surprisingly limited. The paper argues that such projects must be assessed in a broad perspective that includes both operational, tactical and strategic aspects, and unintended as well as intended effects. A generic six-criteria evaluation framework is suggested, inspired by a framework frequently used to evaluate development assistance projects. It is tested on 20 Norwegian projects from various sectors (transport, defence, ICT, buildings). The results indicate that the majority of projects were successful, especially in operational terms, possibly because they underwent external quality assurance up-front. It is argued that applying this type of standardized framework provides a good basis for comparison and learning across sectors. It is suggested that evaluations should be conducted with the aim of promoting accountability, building knowledge about infrastructure projects, and continuously improve the tools, methods and governance arrangements used in the front-end of project development. Copyright © 2018 The Author. Published by Elsevier Ltd.. All rights reserved.

  6. Childhood Obesity Research Demonstration project: Cross-site evaluation method

    Science.gov (United States)

    The Childhood Obesity Research Demonstration (CORD) project links public health and primary care interventions in three projects described in detail in accompanying articles in this issue of Childhood Obesity. This article describes a comprehensive evaluation plan to determine the extent to which th...

  7. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    Science.gov (United States)

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  8. World uranium supply and demand

    International Nuclear Information System (INIS)

    Patterson, J.A.

    1980-01-01

    The role of nuclear energy is under increasing scrutiny and uncertainty. None the less, there will be an increasing need for expansion of uranium supply to fuel committed reactors. Longer-term demand projections are very uncertain. Improved knowledge of the extent of world resources and their availability and economics is needed to support planning for reactor development, especially for breeder reactors, and for fuel-cycle development, especially enrichment, and reprocessing and recycle of uranium and plutonium. Efforts to date to estimate world uranium resources have been very useful but have largely reflected the state of available knowledge for the lower cost resources in regions that have received considerable exploration efforts. The IUREP evaluation of world resources provides an initial speculative estimate of world resources, including areas not previously appraised. Projections of long-range supply from the estimated resources suggest that the high-growth nuclear cases using once-through cycle may not be supportable for very long. However, additional effort is needed to appraise and report more completely and consistently on world resources, the production levels attainable from these resources, and the economic and price characteristics of such production. (author)

  9. Impact evaluation of productive use—An implementation guideline for electrification projects

    International Nuclear Information System (INIS)

    Bensch, Gunther; Peters, Jörg; Schmidt, Christoph M.

    2012-01-01

    There is a consensus in the international community that rural electrification and, in particular, the productive use of electricity contributes to poverty alleviation. At the same time, efforts to evaluate the impacts of development projects have increased substantially. This paper provides a hands-on guide for designing evaluation studies regarding the impacts of productive electricity usage. Complementary to the existing literature on evaluation methods, this guide familiarizes project managers with the concrete steps that have to be undertaken to plan and implement an evaluation. The guide comprises three modules based on enterprise surveys and on anecdotal case studies. For each module, the implementation is described on a step-by-step basis including conceptual issues as well as logistics and methodological questions. - Highlights: ► Hands-on evaluation guideline for development project managers. ► Step-by-step procedure on how to implement evaluation. ► Impacts of productive electricity use.

  10. Growth and Expansion of the International Criticality Safety Benchmark Evaluation Project and the Newly Organized International Reactor Physics Experiment Evaluation Project

    International Nuclear Information System (INIS)

    J. Blair Briggs; Lori Scott; Yolanda Rugama; Enrico Satori

    2007-01-01

    Since ICNC 2003, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) has continued to expand its efforts and broaden its scope. Criticality-alarm/shielding type benchmarks and fundamental physics measurements that are relevant to criticality safety applications are not only included in the scope of the project, but benchmark data are also included in the latest version of the handbook. A considerable number of improvements have been made to the searchable database, DICE and the criticality-alarm/shielding benchmarks and fundamental physics measurements have been included in the database. There were 12 countries participating on the ICSBEP in 2003. That number has increased to 18 with recent contributions of data and/or resources from Brazil, Czech Republic, Poland, India, Canada, and China. South Africa, Germany, Argentina, and Australia have been invited to participate. Since ICNC 2003, the contents of the ''International Handbook of Evaluated Criticality Safety Benchmark Experiments'' have increased from 350 evaluations (28,000 pages) containing benchmark specifications for 3070 critical or subcritical configurations to 442 evaluations (over 38,000 pages) containing benchmark specifications for 3957 critical or subcritical configurations, 23 criticality-alarm-placement/shielding configurations with multiple dose points for each, and 20 configurations that have been categorized as fundamental physics measurements that are relevant to criticality safety applications in the 2006 Edition of the ICSBEP Handbook. Approximately 30 new evaluations and 250 additional configurations are expected to be added to the 2007 Edition of the Handbook. Since ICNC 2003, a reactor physics counterpart to the ICSBEP, The International Reactor Physics Experiment Evaluation Project (IRPhEP) was initiated. Beginning in 1999, the IRPhEP was conducted as a pilot activity by the by the Organization of Economic Cooperation and Development (OECD) Nuclear Energy Agency

  11. Evaluation of Career Education Projects, 1976-1977. Report #7829.

    Science.gov (United States)

    Chern, Hermine J.; And Others

    Evaluations of thirty career education projects in the school district of Philadelphia, Pennsylvania are contained in this report. Fifteen of the projects concern classroom or shop instruction, six concern development and/or field testing of curriculum materials, and the remainder involve staff development, installation of shop equipment, job…

  12. Analysis and Development of a Project Evaluation Process.

    Energy Technology Data Exchange (ETDEWEB)

    Coutant, Charles C.; Cada Glenn F.

    1985-01-01

    The Bonneville Power Administration has responsibility, assigned by the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (Public Law 96-501; 16 USC 839), for implementing the Columbia River Basin Fish and Wildlife Program of the Northwest Power Planning Council. One aspect of this responsibility is evaluation of project proposals and ongoing and completed projects. This report recommends formalized procedures for conducting this work in an accurate, professional, and widely respected manner. Recommendations and justifications are based largely on interviews with federal and state agencies and Indian tribes in the Northwest and nationally. Organizations were selected that have evaluation systems of their own, interact with the Fish and Wildlife Program, or have similar objectives or obligations. Perspective on aspects to be considered were obtained from the social science of evaluation planning. Examples of procedures and quantitative criteria are proposed. 1 figure, 2 tables.

  13. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  14. Evaluating Quality in Educational Spaces: OECD/CELE Pilot Project

    Science.gov (United States)

    von Ahlefeld, Hannah

    2009-01-01

    CELE's International Pilot Project on Evaluating Quality in Educational Spaces aims to assist education authorities, schools and others to maximise the use of and investment in learning environments. This article provides an update on the pilot project, which is currently being implemented in Brazil, Mexico, New Zealand, Portugal and the United…

  15. Socio-economic project evaluation in practice

    International Nuclear Information System (INIS)

    Larsen, A.

    1995-01-01

    The theoretical basis for a socio-economic project evaluation can be doubtful and specific analyses can involve quite essential uncertainty. Among serious theoretical problems of the energy sector there should be named the price distortions, due to various taxes. The choice of the presumed calculation interest can be difficult, due to the extremely long-range energy-political planning. (EG) 10 refs

  16. Evaluating Clustering in Subspace Projections of High Dimensional Data

    DEFF Research Database (Denmark)

    Müller, Emmanuel; Günnemann, Stephan; Assent, Ira

    2009-01-01

    Clustering high dimensional data is an emerging research field. Subspace clustering or projected clustering group similar objects in subspaces, i.e. projections, of the full space. In the past decade, several clustering paradigms have been developed in parallel, without thorough evaluation...... and comparison between these paradigms on a common basis. Conclusive evaluation and comparison is challenged by three major issues. First, there is no ground truth that describes the "true" clusters in real world data. Second, a large variety of evaluation measures have been used that reflect different aspects...... of the clustering result. Finally, in typical publications authors have limited their analysis to their favored paradigm only, while paying other paradigms little or no attention. In this paper, we take a systematic approach to evaluate the major paradigms in a common framework. We study representative clustering...

  17. An Overview of the International Reactor Physics Experiment Evaluation Project

    International Nuclear Information System (INIS)

    Briggs, J. Blair; Gulliford, Jim

    2014-01-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties associated with advanced modeling and simulation accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. Two Organization for Economic Cooperation and Development (OECD) Nuclear Energy Agency (NEA) activities, the International Criticality Safety Benchmark Evaluation Project (ICSBEP), initiated in 1992, and the International Reactor Physics Experiment Evaluation Project (IRPhEP), initiated in 2003, have been identifying existing integral experiment data, evaluating those data, and providing integral benchmark specifications for methods and data validation for nearly two decades. Data provided by those two projects will be of use to the international reactor physics, criticality safety, and nuclear data communities for future decades. An overview of the IRPhEP and a brief update of the ICSBEP are provided in this paper.

  18. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  19. Growth and Expansion of the International Criticality Safety Benchmark Evaluation Project and the Newly Organized International Reactor Physics Experiment Evaluation Project

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Yolanda Rugama; Enrico Satori

    2007-05-01

    Since ICNC 2003, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) has continued to expand its efforts and broaden its scope. Criticality-alarm / shielding type benchmarks and fundamental physics measurements that are relevant to criticality safety applications are not only included in the scope of the project, but benchmark data are also included in the latest version of the handbook. A considerable number of improvements have been made to the searchable database, DICE and the criticality-alarm / shielding benchmarks and fundamental physics measurements have been included in the database. There were 12 countries participating on the ICSBEP in 2003. That number has increased to 18 with recent contributions of data and/or resources from Brazil, Czech Republic, Poland, India, Canada, and China. South Africa, Germany, Argentina, and Australia have been invited to participate. Since ICNC 2003, the contents of the “International Handbook of Evaluated Criticality Safety Benchmark Experiments” have increased from 350 evaluations (28,000 pages) containing benchmark specifications for 3070 critical or subcritical configurations to 442 evaluations (over 38,000 pages) containing benchmark specifications for 3957 critical or subcritical configurations, 23 criticality-alarm-placement / shielding configurations with multiple dose points for each, and 20 configurations that have been categorized as fundamental physics measurements that are relevant to criticality safety applications in the 2006 Edition of the ICSBEP Handbook. Approximately 30 new evaluations and 250 additional configurations are expected to be added to the 2007 Edition of the Handbook. Since ICNC 2003, a reactor physics counterpart to the ICSBEP, The International Reactor Physics Experiment Evaluation Project (IRPhEP) was initiated. Beginning in 1999, the IRPhEP was conducted as a pilot activity by the by the Organization of Economic Cooperation and Development (OECD) Nuclear Energy

  20. Portland Public Schools Project Chrysalis: Year 2 Evaluation Report.

    Science.gov (United States)

    Mitchell, Stephanie J.; Gabriel, Roy M.; Hahn, Karen J.; Laws, Katherine E.

    In 1994, the Chrysalis Project in Portland Public Schools received funding to prevent or delay the onset of substance abuse among a special target population: high-risk, female adolescents with a history of childhood abuse. Findings from the evaluation of the project's second year of providing assistance to these students are reported here. During…

  1. Real Option--A New Approach in the Evaluation of Telecom Investment Projects

    Institute of Scientific and Technical Information of China (English)

    WU Hong

    2005-01-01

    This paper gives a new method into the evaluating system of telecom investment projects, I.e. Real Option. This may overcome the defects resulted from employing Net Present Value (NPV), which is now used in the evaluation of telecom projects. A theoretical analysis of Real Option is provided, followed by an example of telecom investment project to illustrate the differences between the two methods.

  2. [Evaluation of 12 pilot projects to improve outpatient palliative care].

    Science.gov (United States)

    Schmidt-Wolf, G; Elsner, F; Lindena, G; Hilgers, R-D; Heussen, N; Rolke, R; Ostgathe, C; Radbruch, L

    2013-12-01

    With a priority programme the German Cancer Aid supported the development of quality-assured outpatient palliative care to cover the whole country. The 12 regional pilot projects funded with the aim to improve outpatient palliative care in different models and different frameworks were concurrently monitored and evaluated. The supported projects, starting and ending individually, documented all patients who were cared for using HOPE (Hospice and palliative care evaluation) and MIDOS (Minimal documentation system for palliative patients). Total data were analyzed for 3239 patients decriptively. In addition to the quantitative data the experiences of the projects were recorded in a number of workshops (2008, 2009, 2010, and 2012). In particular, the experiences reported in the final meeting in July 2012 were considered for this article as well as the final reports for the German Cancer Aid. In the quantitative evaluation 85.6% of 3239 palliative care patients had a cancer diagnosis. In all model projects the goal of a network with close cooperation of primary providers, social support, and outpatient and inpatient specialist services has been achieved. For all projects, the initial financing of the German Cancer Aid was extremely important, because contracts with health insurance funds were negotiated slowly, and could then be built on the experiences with the projects. The participants of the project-completion meeting emphasized the need to carry out a market analysis before starting palliative care organizations considering the different regional structures and target groups of patients. Education, training and continuing education programs contribute significantly to the network. A reliably funded coordination center/case management across all institutions is extremely important. © Georg Thieme Verlag KG Stuttgart · New York.

  3. The International Criticality Safety Benchmark Evaluation Project

    International Nuclear Information System (INIS)

    Briggs, B. J.; Dean, V. F.; Pesic, M. P.

    2001-01-01

    In order to properly manage the risk of a nuclear criticality accident, it is important to establish the conditions for which such an accident becomes possible for any activity involving fissile material. Only when this information is known is it possible to establish the likelihood of actually achieving such conditions. It is therefore important that criticality safety analysts have confidence in the accuracy of their calculations. Confidence in analytical results can only be gained through comparison of those results with experimental data. The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the US Department of Energy. The project was managed through the Idaho National Engineering and Environmental Laboratory (INEEL), but involved nationally known criticality safety experts from Los Alamos National Laboratory, Lawrence Livermore National Laboratory, Savannah River Technology Center, Oak Ridge National Laboratory and the Y-12 Plant, Hanford, Argonne National Laboratory, and the Rocky Flats Plant. An International Criticality Safety Data Exchange component was added to the project during 1994 and the project became what is currently known as the International Criticality Safety Benchmark Evaluation Project (ICSBEP). Representatives from the United Kingdom, France, Japan, the Russian Federation, Hungary, Kazakhstan, Korea, Slovenia, Yugoslavia, Spain, and Israel are now participating on the project In December of 1994, the ICSBEP became an official activity of the Organization for Economic Cooperation and Development - Nuclear Energy Agency's (OECD-NEA) Nuclear Science Committee. The United States currently remains the lead country, providing most of the administrative support. The purpose of the ICSBEP is to: (1) identify and evaluate a comprehensive set of critical benchmark data; (2) verify the data, to the extent possible, by reviewing original and subsequently revised documentation, and by talking with the

  4. Federal Workplace Literacy Project. Internal Evaluation Report.

    Science.gov (United States)

    Matuszak, David J.

    This report describes the following components of the Nestle Workplace Literacy Project: six job task analyses, curricula for six workplace basic skills training programs, delivery of courses using these curricula, and evaluation of the process. These six job categories were targeted for training: forklift loader/checker, BB's processing systems…

  5. The Heartfile Lodhran CVD prevention project--end of project evaluation.

    Science.gov (United States)

    Nishtar, Sania; Badar, Asma; Kamal, Mohammad Umer; Iqbal, Azhar; Bajwa, Rashid; Shah, Tauqeer; Larik, Zahid; Karim, Fazle; Mehmood, Mahmood ul Hassan; Jehangir, Haroon; Azam, Syed Iqbal; Mirza, Yasir Abbas; Khan, Shahzad Ali; Qayyum, Aamra; Aqeel, Fauzia; Bakir, Abdul; Rahim, Ejaz

    2007-01-01

    Mainstream preventive interventions often fail to reach poor populations with a high risk of cardiovascular diseases (CVDs) in Pakistan. A community-based CVD primary prevention project aimed at developing approaches to reduce risk factors in such populations was established by Heartfile in collaboration with the National Rural Support Program in the district of Lodhran. The project implemented a range of activities integrated with existing social and health service mechanisms during a three year intervention period 2000/01-03/04. These were targeted in 4 key settings: community health education, mass media interventions, training of health professionals and health education through Lady Health Workers. The project received support from the Department for International Development, U.K. At the community level, a pre-test-post-test quasi-experimental design was used for examining project outcomes related to the community component of the intervention. Pre and post-intervention (training) evaluations were conducted involving all health care providers in randomly selected workshops in order to determine baseline levels of knowledge and the impact of training on knowledge level. In order to assess practices of physician and non-physician health care providers patient interviews, with control comparisons were conducted at each health care facility. Significant positive changes were observed in knowledge levels at a community level in the district of intervention compared with baseline knowledge levels particularly in relation to a heart healthy diet, beneficial level of physical activity, the causes of high blood pressure and heart attack and the effects of high blood pressure and active and passive smoking on health. Significant changes in behaviors at a practice level were not shown in the district of intervention. However the project played a critical role in spurring national action for the prevention and control of non-communicable diseases and introducing

  6. Project monitoring and evaluation: an enhancing method for health research system management.

    Science.gov (United States)

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  7. Decay data evaluation project: Evaluation of 52Mn and 52mMn nuclear decay data

    Science.gov (United States)

    Luca, Aurelian

    2017-09-01

    All nuclear decay data within the 52Fe-52m,52Mn-52Cr decay chain have been evaluated at IFIN-HH, Romania, as part of an IAEA coordinated research project (F41029) and incorporated into the Decay Data Evaluation Project (DDEP). Both 52Fe and daughter 52Mn are two potentially promising radionuclides to be incorporated into suitable radiopharmaceuticals for PET and SPECT imaging. The decay data evaluation of 52Fe has previously been published and reported to the IAEA Nuclear Data Section. Equivalent DDEP evaluations for 52Mn and 52mMn have also been completed recently, and are presented in summary form below. These improved decay data sets have also been reported to the IAEA in detail, and are highly suitable in dose rate calculations for their application in nuclear medicine.

  8. Evaluation of the Relational Competence Project 2012-16

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    2017-01-01

    The relational competence project was initiated by a broad group of stakeholders, referring to both research and to concrete experiences of a need for development in schools and teacher education. The evaluation of the project has been based on a retrospective survey with answers and reflections......, and the same was new insight into the importance of relations and the concrete tools and approaches tried with students in schools. Some of the challenges emphasised was about the so-called “inner exercises”. It seems that systematic enactments with these exercises was perceived as extremely beneficial...... the project aspects to frame their inquiries for the final bachelor-project. Those students have experienced the highest level of professional outcomes. Relational competence has in their bachelor-inquiries been used in a very wide range of pedagogical and subject matter contexts, emphasizing relational...

  9. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Agol, Dorice, E-mail: d.agol@uea.a.c.uk [University of East Anglia, School of International Development, Norwich NR4 7TJ (United Kingdom); Latawiec, Agnieszka E., E-mail: a.latawiec@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Opole University of Technology, Department of Production Engineering and Logistics, Luboszycka 5, 45-036 Opole (Poland); University of East Anglia, School of Environmental Sciences, Norwich NR4 7TJ (United Kingdom); Strassburg, Bernardo B.N., E-mail: b.strassburg@iis-rio.org [International Institute for Sustainability, Estrada Dona Castorina 124, 22460-320 Rio de Janeiro (Brazil); Department of Geography and the Environment, Pontificia Universidade Catolica, 22453-900 Rio de Janeiro (Brazil)

    2014-09-15

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  10. Evaluating impacts of development and conservation projects using sustainability indicators: Opportunities and challenges

    International Nuclear Information System (INIS)

    Agol, Dorice; Latawiec, Agnieszka E.; Strassburg, Bernardo B.N.

    2014-01-01

    There has been an increased interest in using sustainability indicators for evaluating the impacts of development and conservation projects. Past and recent experiences have shown that sustainability indicators can be powerful tools for measuring the outcomes of various interventions, when used appropriately and adequately. Currently, there is a range of methods for applying sustainability indicators for project impact evaluation at the environment–development interface. At the same time, a number of challenges persist which have implication for impact evaluation processes especially in developing countries. We highlight some key and recurrent challenges, using three cases from Kenya, Indonesia and Brazil. In this study, we have conducted a comparative analysis across multiple projects from the three countries, which aimed to conserve biodiversity and improve livelihoods. The assessments of these projects were designed to evaluate their positive, negative, short-term, long term, direct and indirect impacts. We have identified a set of commonly used sustainability indicators to evaluate the projects and have discussed opportunities and challenges associated with their application. Our analysis shows that impact evaluation processes present good opportunities for applying sustainability indicators. On the other hand, we find that project proponents (e.g. managers, evaluators, donors/funders) face challenges with establishing full impacts of interventions and that these are rooted in monitoring and evaluation processes, lack of evidence-based impacts, difficulties of measuring certain outcomes and concerns over scale of a range of impacts. We outline key lessons learnt from the multiple cases and propose ways to overcome common problems. Results from our analysis demonstrate practical experiences of applying sustainability indicators in developing countries context where there are different prevailing socio-economic, cultural and environmental conditions. The

  11. Introduction course on the economical evaluation of energy projects

    International Nuclear Information System (INIS)

    Jansen, J.C.

    1992-06-01

    A theoretical course on the financial and economical evaluation of energy projects is presented. The course was organized by the Banque Mondiale in Bujumbura, Burundi, from 11 to 16 November 1991. Subsequently attention is paid to the basics of economic analysis, the financial and the economical analysis of an investment project, and finally the prices of energy products. 4 figs., 13 refs

  12. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  13. Color back projection for fruit maturity evaluation

    Science.gov (United States)

    Zhang, Dong; Lee, Dah-Jye; Desai, Alok

    2013-12-01

    In general, fruits and vegetables such as tomatoes and dates are harvested before they fully ripen. After harvesting, they continue to ripen and their color changes. Color is a good indicator of fruit maturity. For example, tomatoes change color from dark green to light green and then pink, light red, and dark red. Assessing tomato maturity helps maximize its shelf life. Color is used to determine the length of time the tomatoes can be transported. Medjool dates change color from green to yellow, and the orange, light red and dark red. Assessing date maturity helps determine the length of drying process to help ripen the dates. Color evaluation is an important step in the processing and inventory control of fruits and vegetables that directly affects profitability. This paper presents an efficient color back projection and image processing technique that is designed specifically for real-time maturity evaluation of fruits. This color processing method requires very simple training procedure to obtain the frequencies of colors that appear in each maturity stage. This color statistics is used to back project colors to predefined color indexes. Fruit maturity is then evaluated by analyzing the reprojected color indexes. This method has been implemented and used for commercial production.

  14. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    Science.gov (United States)

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Basalt Waste Isolation Project Technical Program Evaluation Process: a criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, G.C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the SWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (MWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP wll be further formalized and further applied to the review of BWIP technical activities

  16. Success factors for international HTA projects: evaluating EUnetHTA Joint Action as an exemplar.

    Science.gov (United States)

    Guegan, Eleanor Woodford; Cook, Andrew

    2014-11-01

    Evaluation is essential for the management of international projects or networks in health technology assessment (HTA). It extends beyond the normal process of project management by incorporating qualitative dimensions and provides information about a project's effectiveness and achievements. This article aimed to identify the factors that are important for the success of international HTA projects. The European network for Health Technology Assessment Joint Action (EUnetHTA JA) is presented as an exemplar. METHODS for the evaluation of international HTA projects include interviews, focus groups, questionnaires, observations and documentary review, and the key points of these approaches have been summarized. The impact and effectiveness of the EUnetHTA JA was evaluated by questionnaires of project participants and external stakeholders, and by documentary review. The response rate for the three annual questionnaires sent to project participants ranged from 86 percent to 88 percent and for external stakeholders ranged from 65 percent to 88 percent. Key factors for project success included production of deliverables according to the workplan, achievement of objectives, added value generated, effective communication, involvement of external stakeholders, workstream management and progress from the preceding EUnetHTA 2006-2008 project. The experience of this project can inform the evaluation of future international HTA collaborations, such as the EUnetHTA 2nd Joint Action and HTAsiaLink. A high response rate was achieved to the self-completion questionnaires and the strategy followed is recommended for evaluation of international HTA projects. Future assessments of international HTA projects should strive to measure outcomes and impact, not just outputs and process.

  17. Formative evaluation of the telecare fall prevention project for older veterans.

    Science.gov (United States)

    Miake-Lye, Isomi M; Amulis, Angel; Saliba, Debra; Shekelle, Paul G; Volkman, Linda K; Ganz, David A

    2011-05-23

    Fall prevention interventions for community-dwelling older adults have been found to reduce falls in some research studies. However, wider implementation of fall prevention activities in routine care has yielded mixed results. We implemented a theory-driven program to improve care for falls at our Veterans Affairs healthcare facility. The first project arising from this program used a nurse advice telephone line to identify patients' risk factors for falls and to triage patients to appropriate services. Here we report the formative evaluation of this project. To evaluate the intervention we: 1) interviewed patient and employee stakeholders, 2) reviewed participating patients' electronic health record data and 3) abstracted information from meeting minutes. We describe the implementation process, including whether the project was implemented according to plan; identify barriers and facilitators to implementation; and assess the incremental benefit to the quality of health care for fall prevention received by patients in the project. We also estimate the cost of developing the pilot project. The project underwent multiple changes over its life span, including the addition of an option to mail patients educational materials about falls. During the project's lifespan, 113 patients were considered for inclusion and 35 participated. Patient and employee interviews suggested support for the project, but revealed that transportation to medical care was a major barrier in following up on fall risks identified by nurse telephone triage. Medical record review showed that the project enhanced usual medical care with respect to home safety counseling. We discontinued the program after 18 months due to staffing limitations and competing priorities. We estimated a cost of $9194 for meeting time to develop the project. The project appeared feasible at its outset but could not be sustained past the first cycle of evaluation due to insufficient resources and a waning of local

  18. Formative evaluation of the telecare fall prevention project for older veterans

    Directory of Open Access Journals (Sweden)

    Saliba Debra

    2011-05-01

    Full Text Available Abstract Background Fall prevention interventions for community-dwelling older adults have been found to reduce falls in some research studies. However, wider implementation of fall prevention activities in routine care has yielded mixed results. We implemented a theory-driven program to improve care for falls at our Veterans Affairs healthcare facility. The first project arising from this program used a nurse advice telephone line to identify patients' risk factors for falls and to triage patients to appropriate services. Here we report the formative evaluation of this project. Methods To evaluate the intervention we: 1 interviewed patient and employee stakeholders, 2 reviewed participating patients' electronic health record data and 3 abstracted information from meeting minutes. We describe the implementation process, including whether the project was implemented according to plan; identify barriers and facilitators to implementation; and assess the incremental benefit to the quality of health care for fall prevention received by patients in the project. We also estimate the cost of developing the pilot project. Results The project underwent multiple changes over its life span, including the addition of an option to mail patients educational materials about falls. During the project's lifespan, 113 patients were considered for inclusion and 35 participated. Patient and employee interviews suggested support for the project, but revealed that transportation to medical care was a major barrier in following up on fall risks identified by nurse telephone triage. Medical record review showed that the project enhanced usual medical care with respect to home safety counseling. We discontinued the program after 18 months due to staffing limitations and competing priorities. We estimated a cost of $9194 for meeting time to develop the project. Conclusions The project appeared feasible at its outset but could not be sustained past the first cycle of

  19. An Analysis of Internally Funded Learning and Teaching Project Evaluation in Higher Education

    Science.gov (United States)

    Huber, Elaine; Harvey, Marina

    2016-01-01

    Purpose: In the higher education sector, the evaluation of learning and teaching projects is assuming a role as a quality and accountability indicator. The purpose of this paper is to investigate how learning and teaching project evaluation is approached and critiques alignment between evaluation theory and practice. Design/Methodology/Approach:…

  20. Research on Comprehensive Evaluation Method for Heating Project Based on Analytic Hierarchy Processing

    Science.gov (United States)

    Han, Shenchao; Yang, Yanchun; Liu, Yude; Zhang, Peng; Li, Siwei

    2018-01-01

    It is effective to reduce haze in winter by changing the distributed heat supply system. Thus, the studies on comprehensive index system and scientific evaluation method of distributed heat supply project are essential. Firstly, research the influence factors of heating modes, and an index system with multiple dimension including economic, environmental, risk and flexibility was built and all indexes were quantified. Secondly, a comprehensive evaluation method based on AHP was put forward to analyze the proposed multiple and comprehensive index system. Lastly, the case study suggested that supplying heat with electricity has great advantage and promotional value. The comprehensive index system of distributed heating supply project and evaluation method in this paper can evaluate distributed heat supply project effectively and provide scientific support for choosing the distributed heating project.

  1. Formative Evaluation of a Nutritional Marketing Project in City-Center Restaurants.

    Science.gov (United States)

    Demers, Andree; Renaud, Lise

    1992-01-01

    Formative evaluation of a community health project providing and promoting low-fat foods in five restaurants in Montreal (Canada) shows that restaurateurs are willing to collaborate in project implementation but not in training waiters and that the project did not cause an increase in market demand for low-fat menu offerings. (SLD)

  2. Extensive Evaluation of Using a Game Project in a Software Architecture Course

    Science.gov (United States)

    Wang, Alf Inge

    2011-01-01

    This article describes an extensive evaluation of introducing a game project to a software architecture course. In this project, university students have to construct and design a type of software architecture, evaluate the architecture, implement an application based on the architecture, and test this implementation. In previous years, the domain…

  3. Performance Evaluation of Public-Private Partnership Projects from the Perspective of Efficiency, Economic, Effectiveness, and Equity: A Study of Residential Renovation Projects in China

    Directory of Open Access Journals (Sweden)

    Xuhui Cong

    2018-06-01

    Full Text Available The performance evaluation index system was established on the basis of 4E (Efficiency, Economic, Effectiveness, Equity theory to improve performance evaluation of Public-Private Partnership Projects for Residential Renovation (4P2R. Moreover, the index weighting model was demonstrated based on Ordered Weighted Averaging (OWA. Finally, the cloud model was used for performance evaluation, through the cloud uncertainty reasoning to determine the quantitative performance evaluation index value, the positive reverse cloud to calculate the qualitative performance evaluation index value, and the normal cloud to measure the project performance. The proof-of-concept application shows that the performance evaluation index system and evaluation model can better identify the deficiencies in the project, and provide targeted improvement measures for similar projects in the future.

  4. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    Science.gov (United States)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  5. pep-up: a review of the umgeni valley pro.ject evaluation process

    African Journals Online (AJOL)

    The evaluation process at the Umgeni Valle~ Project is.described. Its evolution, background and ... mental Education circles in Southern Africa. The ... t? the percei~ed need for evaluation of the Umgen1 Valley ProJect. ... This group, insisting that they were facilitating .... Phase : An integrated summary of all fielc and working ...

  6. Evaluation system of Research and Development projects and services from ININ

    International Nuclear Information System (INIS)

    Reglero, R.

    1994-01-01

    To make a plan for a project is one thing; to control it are a hundred things at the same time. Because of this fact, the enterprises and Research and Development Institutions have searched better ways to manage this activities. The management system of Research and Development projects and services from ININ, is used as a recording, evaluation tracking, information and control of result instrument for these activities. The need to have update information of different activities in the working areas of ININ, such as: Projects, technical or technological services either internal or external; diffusion programs and human resources training programs; and departmental activities, has taken to the development of uniform methods of recording, evaluation tracking and control of events, which allow the standardization, compilation, analysis and reporting of the results in an easy and quick way. The elaboration of an original scheme for the evaluation system of assessment for Research and Development projects and services was started in July 1988, and the data acquisition was manual. The use of Personal Computers began at 1992. (Author)

  7. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  8. Mark 4A project training evaluation

    Science.gov (United States)

    Stephenson, S. N.

    1985-01-01

    A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.

  9. Mark 4A project training evaluation

    Science.gov (United States)

    Stephenson, S. N.

    1985-11-01

    A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.

  10. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  11. Evaluating the US government's crude oil price projections

    International Nuclear Information System (INIS)

    Williams, M.D.

    1992-01-01

    The U.S. Department of Energy's (DOE) 1991 official long run crude oil price projections are evaluated by comparing parameter averages for the forecast period (1991-2010) to parameter averages from crude oil price history (1859-1990). The parameters used in the evaluation are average price, average annual price changes, and average cycle duration (in years). All prices used in the analysis are annual prices in constant 1990 dollars per barrel. 13 figs

  12. Using Evaluability Assessment to Improve Program Evaluation for the Blue-Throated Macaw Environmental Education Project in Bolivia

    Science.gov (United States)

    Salvatierra da Silva, Daniela; Jacobson, Susan K.; Monroe, Martha C.; Israel, Glenn D.

    2016-01-01

    An evaluability assessment of a program to save a critically endangered bird helped prepare the Blue-throated Macaw Environmental Education Project for evaluation and program improvement. The evaluability assessment facilitated agreement among key stakeholders on evaluation criteria and intended uses of evaluation information in order to maximize…

  13. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  14. TRIM timber projections: an evaluation based on forest inventory measurements.

    Science.gov (United States)

    John R. Mills

    1989-01-01

    Two consecutive timberland inventories collected from permanent plots in the natural pine type in North Carolina were used to evaluate the timber resource inventory model (TRIM). This study compares model predictions with field measurements and examines the effect of inventory data aggregation on the accuracy of projections. Projections were repeated for two geographic...

  15. Evaluation of Nuclear Facility Decommissioning Projects program

    International Nuclear Information System (INIS)

    Baumann, B.L.

    1983-01-01

    The objective of the Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program is to provide the NRC licensing staff with data which will allow an assessment of radiation exposure during decommissioning and the implementation of ALARA techniques. The data will also provide information to determine the funding level necessary to ensure timely and safe decommissioning operations. Actual decommissioning costs, methods and radiation exposures are compared with those estimated by the Battelle-PNL and ORNL NUREGs on decommissioning. Exposure reduction techniques applied to decommissioning activities to meet ALARA objectives are described. The lessons learned concerning various decommissioning methods are evaluated

  16. Fuzzy logic approach for energetic and economic evaluation of hydroelectric projects

    International Nuclear Information System (INIS)

    Iliev, Atanas M.

    2003-01-01

    A mathematical model for energetic and economic evaluation of hydroelectric projects is developed. The main advantage of the proposed methodology is that the model considers uncertainty and vagueness which appears during the decision making process. Due to modeling of variables that are non statistical in their character, fuzzy logic approach is fully incorporated in the model. The first step in energetic evaluation of the hydro power projects is determination of the characteristic of the efficiency of the units to be installed in hydro power plants. For this purpose the model which uses the best characteristics of Artificial Network Fuzzy Inference System (ANFIS) is applied. The method is tested on real systems: HPP Tikves- the power plant in operation and HPP Kozjak - the power plant in construction. The results obtained from practical implementation show that the proposed approach gives superior results than classical polynomial approximation. The model for determining the consumption characteristic of hydro power plant is developed by Sugeno Fuzzy Logic System with polynomials in the consequent part of the rules. Model takes into account the variable gross head of HPP, as well as, the number of units which will be in operation for given output. Modeling of the gross head and power output are performed by expert's design membership functions. This model is practically applied on HPP Tikves for determination of the consumption characteristic for several gross head. The plausible yearly production of electricity from hydro power project, which is important for estimation of the benefit from the project, is calculated by mixed fuzzy-statistical model. hi this approach fuzzy set of the inflow is constructed according to the statistical parameters. The calculation of the production of electricity is realized for a several hydrological conditions which are described by linguistic variables. Finally, Mamdani Fuzzy Inference System with fuzzy number in consequent part

  17. Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique

    Directory of Open Access Journals (Sweden)

    Walid Mustafa Kamas

    2017-05-01

    Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.

  18. Realization of economic evaluation expert system for uranium mine project

    International Nuclear Information System (INIS)

    Wang Haifeng

    1993-01-01

    By studying the EVALUATOR, economic evaluation expert system of uranium mine project, the theoretical fundamentals of expert system, principle of inference mechanism, implementation of knowledge base, realization of explanation mechanism, acquisition of domain knowledge and representation of knowledge were described, especially the subjective Bayes approach for inexact reasoning problem used in EVALUATOR was discussed in detail

  19. Integrated evaluation framework. Based on the logical framework approach for project cycle management

    International Nuclear Information System (INIS)

    1996-11-01

    This Integrated Evaluation Framework (IEF) was developed by TC Evaluation with the aim of presenting in a comprehensive manner the logic of thinking used when evaluating projects and programmes. Thus, in the first place, the intended audience for this report are evaluation officers, so that when applying the evaluation procedures and check lists, data can be organized following a systematic and logical scheme and conclusions can be derived ''objectively''. The value of such a framework for reporting on performance and in providing a quality reference for disbursements represents one of its major advantages. However, when developing and applying the IEF, it was realized that a Logical Framework Approach (LFA), like the one upon which the IEF is based, needs to be followed throughout the project life cycle, from the Country Programme Framework planning stage, through project design and implementation. Then, the helpful consequences flow into project design quality and smooth implementation. It is only in such an environment that meaningful and consistent evaluation can take place. Therefore the main audience for this report are Agency staff involved in planning, designing and implementing TC projects as well as their counterparts in Member States. In this understanding, the IEF was subjected to review by a consultants meeting, which included both external consultants and Agency staff. This Consultants Review Meeting encouraged the Secretariat to further adopt the LFA into the TC management process

  20. Evaluating a "Second Life" Problem-Based Learning (PBL) Demonstrator Project: What Can We Learn?

    Science.gov (United States)

    Beaumont, Chris; Savin-Baden, Maggi; Conradi, Emily; Poulton, Terry

    2014-01-01

    This article reports the findings of a demonstrator project to evaluate how effectively Immersive Virtual Worlds (IVWs) could support problem-based learning. The project designed, created and evaluated eight scenarios within "Second Life" (SL) for undergraduate courses in health care management and paramedic training. Evaluation was…

  1. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  2. Evaluation of the indexes of income yield capacity of energetic projects

    International Nuclear Information System (INIS)

    Villanueva M, C.

    2008-01-01

    An economic-financial model to evaluate in the class living room those indexes of profitability of projects of productive infrastructure of the energy sector was developed, as for example: generation projects, transmission and electric energy distribution; projects of transport and distribution of natural gas; projects of cogeneration of vapor and electricity; projects of refinement of petroleum; and other industrial projects. It is described the structure and operation of the pattern, which has been implemented in an Excel calculation sheet that the students use in their personal computers to apply it to the evaluation of the indexes of profitability, specified by the Secretaria de Hacienda y Credito Publico (SHCP) in their limits for the elaboration and presentation of the cost and benefit analysis of the programs and projects of investment of the public sector. The indicators are: present net value VPN, quotient benefits cost B/C, return internal rate TIR, and equivalent annual cost CAE, which should be calculated with methodological rigor according to the SHCP lineaments. The pattern uses the pre-programmed financial functions in the Excel calculation sheet to carry out the compute of the indicators starting from the effective flow of the projects. It is described the technician-economic configuration and the effective flows during the useful life of three power stations of electric power generation that are designed, builds and operated to sell electric power to the national interconnected system in a nodal marginal prices market: a hydroelectric one, a combined cycle power station that uses natural gas, and a nucleo electric. The effective flows are developed and the central profitability of three centrals are evaluated and they are also carried out the corresponding sensitivity analyses and indifference required by the SHCP in their lineaments. Finally, the conditions in that the projects should operate and the prices in those that should sell their

  3. The Basalt Waste Isolation Project technical program evaluation process: A criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the BWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (NWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP will be further formalized and further applied to the review of BWIP technical activities

  4. An economic analysis methodology for project evaluation and programming.

    Science.gov (United States)

    2013-08-01

    Economic analysis is a critical component of a comprehensive project or program evaluation methodology that considers all key : quantitative and qualitative impacts of highway investments. It allows highway agencies to identify, quantify, and value t...

  5. THE POLITICS OF EVALUATION IN CO-FINANCED PROJECTS: THE CASE OF THE SCOTTISH EXECUTIVE AND THE EVALUATION OF THE STRUCTURAL FUNDS

    Directory of Open Access Journals (Sweden)

    Delia M. Costân

    2009-06-01

    Full Text Available This paper combines an analysis of the different theories expressed in the literature in relation to the process of evaluation and their empirical application to the case of a project evaluation undertaken by the Scottish Executive. The evaluation undertaken by the Scottish Executive is analysed in the context of the various theories and hypotheses expressed in the evaluation literature. Insight into the activity undertaken by the Scottish Executive and access to primary documents used, was facilitated by the author’s participation in a six week internship within the Structural Funds Division of the Scottish Executive. The analysis of the evaluation of the co-financed projects in Scotland revealed that the challenges to the process of evaluation in Scotland resulted in part from the existence of different understandings by the various stakeholders involved in the setting of the goals of the evaluation process. The author’s findings on the application of Article 4 in Scotland are that the different interpretations of Article 4 come from the European Commissions’ general approach to evaluation;, the Scottish Executives’ emphasis on meeting the absorption requirements of the Structural Funds and less on detailed evaluation, and the Programme Management Executives’ focus on supporting the project beneficiaries and less on evaluating the projects.

  6. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    Energy Technology Data Exchange (ETDEWEB)

    Hornung, M. [Inst. of Terrestrial Ecology, Grange-over-Sands (United Kingdom); Kellomaeki, S. [Joensuu Univ. (Finland). Dept. of Forestry; Larsen, J.B. [Royal Veterinary Univ., Fredriksberg (Denmark). Dept. of Economics and Natural Resources

    1995-12-31

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  7. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    Energy Technology Data Exchange (ETDEWEB)

    Hornung, M [Inst. of Terrestrial Ecology, Grange-over-Sands (United Kingdom); Kellomaeki, S [Joensuu Univ. (Finland). Dept. of Forestry; Larsen, J B [Royal Veterinary Univ., Fredriksberg (Denmark). Dept. of Economics and Natural Resources

    1996-12-31

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  8. International evaluation of Swedish research projects on the environmental impacts of wood fuel harvesting

    International Nuclear Information System (INIS)

    Hornung, M.; Kellomaeki, S.; Larsen, J.B.

    1995-01-01

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK's aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme on the Environmental Impacts of Wood Fuel Harvest. Thereafter, the projects are evaluated separately. The Committee was unanimous in its conclusions. Evaluated projects: Whole tree harvesting effects on forest soil; Whole tree utilization - forest yield; Nature conservation/Forest energy; Utilizing hardwoods from first thinnings of spruce as fuel wood

  9. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume I: Summary Volume.

    Science.gov (United States)

    Stenner, A. Jackson; And Others

    This document contains the first of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  10. International Reactor Physics Experiment Evaluation (IRPhE) Project

    International Nuclear Information System (INIS)

    2013-01-01

    The International Reactor Physics Experiment Evaluation (IRPhE) Project aims to provide the nuclear community with qualified benchmark data sets by collecting reactor physics experimental data from nuclear facilities, worldwide. More specifically the objectives of the expert group are as follows: - maintaining an inventory of the experiments that have been carried out and documented; - archiving the primary documents and data released in computer-readable form; - promoting the use of the format and methods developed and seek to have them adopted as a standard. For those experiments where interest and priority is expressed by member countries or working parties and executive groups within the NEA provide guidance or co-ordination in: - compiling experiments into a standard international agreed format; - verifying the data, to the extent possible, by reviewing original and subsequently revised documentation, and by consulting with the experimenters or individuals who are familiar with the experimenters or the experimental facility; - analysing and interpreting the experiments with current state-of-the-art methods; - publishing electronically the benchmark evaluations. The expert group will: - identify gaps in data and provide guidance on priorities for future experiments; - involve the young generation (Masters and PhD students and young researchers) to find an effective way of transferring know-how in experimental techniques and analysis methods; - provide a tool for improved exploitation of completed experiments for Generation IV reactors; - coordinate closely its work with other NSC experimental work groups in particular the International Criticality Safety Benchmark Evaluation Project (ICSBEP), the Shielding Integral Benchmark Experiment Data Base (SINBAD) and others, e.g. knowledge preservation in fast reactors of the IAEA, the ANS Joint Benchmark Activities; - keep a close link with the working parties on scientific issues of reactor systems (WPRS), the expert

  11. An Effective Model for Efficiency Evaluation of Strategic Project Based on

    Directory of Open Access Journals (Sweden)

    Virgil ROTARU

    2015-10-01

    Full Text Available When analyzing a strategic development project implemented by universities both the system created, as a temporary organization having the participant organizations as distinctive actors and the universities have to be seen as learning organizations. As a consequence, the evaluation of such projects should always be more complex since there are intangible results and outcomes to be considered and an appropriate method for analyze is a must. Such a complex method, initially introduced by Caplan and Norton (1992 as balanced scorecard (BSC was later on developed based on frequently addressed critics. Nevertheless, more than 40% of the biggest 500 companies in the world, use BSC as an evaluation method for their strategic performance and almost all of strategic development projects analysis includes financial and non-financial perspectives as those of BSC. Although a lot of improvements have been done already, there are still very few steps done in the direction of connection BSC with the social networking analysis. This study reflects our actual research aiming to design a more effectiv system for strategic analysis, that to integrate social network analysis and a system dynamics BSC in a more complex analysis method for efficiency evaluation of the strategic project

  12. Effective Transition (Project E.T.) Final Evaluation Report, 1992-93. OER Report.

    Science.gov (United States)

    Musante, Patricia

    This report presents an evaluation of the Effective Transition (ET) project, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Lafayette High School and Pershing Intermediate School in Brooklyn, New York. The project served a total of 300 students of limited English proficiency who were native…

  13. Evaluation of the Family/School Partnership Project, Year III, 1996-97.

    Science.gov (United States)

    Kester, Donald L.; Plakos, John; Santos, Will

    The report details the third-year evaluation of a transitional bilingual education project at Chester W. Nimitz Middle School in Huntington Park, California. The Family/School Partnership Project is designed to assist limited English proficient students in mastering English skills to transition to regular classroom activities by integrating…

  14. Evaluation of a diabetes nurse specialist prescribing project.

    Science.gov (United States)

    Wilkinson, Jill; Carryer, Jenny; Adams, Jeffery

    2014-08-01

    To evaluate the diabetes nurse specialist prescribing project with the aim of determining whether diabetes nurse specialist prescribing is safe and effective and to inform the implementation and extension of registered nurse prescribing. Registered nurses in many countries are able to prescribe medicines, but in New Zealand, prior to the diabetes nurse specialist project, nurse practitioners were the only nurses who could prescribe medicines. New regulations allowed the nurses to prescribe a limited number of prescription medicines. The study was a process and outcome clinical programme evaluation. The project took place between April-September 2011 and involved 12 diabetes nurse specialist in four localities. Quantitative data were collected from clinical records maintained by the diabetes nurse specialist for the project (1274 patients and 3402 prescribing events), from surveys with stakeholders (general practitioners, n = 30; team members, n = 19; and patients, n = 89) and audits from patient notes (n = 117) and prescriptions (n = 227), and qualitative data from interviews with project participants (n = 18) and patients (n = 19). All data were analysed descriptively. Diabetes nurse specialist prescribing was determined to be safe, of high quality and appropriate. It brought important benefits to the effectiveness of specialist diabetes services, was acceptable to patients and was supported by the wider healthcare team. These findings are consistent with the findings reported in the international literature about nurse prescribing in a range of different practice areas. Clarification of the education and competence requirements and resourcing for the ongoing supervision of nurses is recommended if the prescribing model is to be extended. Diabetes nurse specialist prescribing improved access to medicines by providing a more timely service. Nurses felt more satisfied with their work because they could independently provide a complete episode of care

  15. An Evaluation of the Agriculture Science Project in Mauritius. African Studies in Curriculum Development & Evaluation No. 102.

    Science.gov (United States)

    Jeeroburkhan, M. Fazal

    This study evaluated the Agricultural Curriculum Project which is being implemented in 16 secondary schools in Mauritius. Specific areas examined included: (1) the relevance, appropriateness, and practicability of the project's general objectives; (2) the relevance, balance, and organization of the course content; (3) the effectiveness and…

  16. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  17. Evaluating the Effectiveness of Collaborative Computer-Intensive Projects in an Undergraduate Psychometrics Course

    Science.gov (United States)

    Barchard, Kimberly A.; Pace, Larry A.

    2010-01-01

    Undergraduate psychometrics classes often use computer-intensive active learning projects. However, little research has examined active learning or computer-intensive projects in psychometrics courses. We describe two computer-intensive collaborative learning projects used to teach the design and evaluation of psychological tests. Course…

  18. Workplace Literacy Program (WPL) at Chinatown Manpower Project, Inc. Final Evaluation.

    Science.gov (United States)

    Friedenberg, Joan E.

    This document describes the procedures for and results of the external evaluation of the workplace literacy program for underemployed garment industry workers with low English skills at Chinatown Manpower Project, Inc. in Chinatown in New York City. The document describes the evaluation design and methodology as well as the evaluation results,…

  19. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  20. NNWSI project information management system concepts evaluation report. Final report

    International Nuclear Information System (INIS)

    1986-08-01

    This report is intended as a first step in developing detailed information management system specifications for the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. The current state of information management at the NNWSI Project level is investigated and an information management system (IMS) is proposed. The IMS as it relates to aspects of Project and records management is discussed. Information management concepts and prospective IMS system components are investigated. Concepts and system components include: indexing, searching, retrieval, data base management system technology, computers, storage media, computer-assisted retrieval (CAR) of microfilm, electronic imaging-based systems, optical character recognition, and communications. Performance criteria and desirable system attributes applicable to the IMS are discussed. Six conceptual system approaches capable of satisfying the performance criteria are defined. System approaches include: fully centralized microfilm system based on CAR retrieval (Approach 1), partially distributed microfilm system based on CAR retrieval (Approach 2), fully distributed microfilm system based on CAR retrieval (Approach 3), fully centralized optical disk system based on electronic image and full-text retrieval (Approach 4), partially distributed optical system based on electron image and full-text retrieval (Approach 5), and fully distributed optical disk system based on electronic image and full-text retrieval (Approach 6). Technical and cost considerations associated with the six conceptual approaches are evaluated. Technical evaluation results indicate Approach 4 is the best conceptual approach, and cost evaluation results show no significant differences among approaches. On the basis of the evaluation, Approach 4 is recommended

  1. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  2. Project Rulison: post-shot plans and evaluations

    Energy Technology Data Exchange (ETDEWEB)

    1969-12-01

    Project Rulison post-shot plans and evaluations are discussed and include physical characteristics of the Rulison cavity; pressure and temperature expected in the cavity; amount, nature, and distribution of radioactivity in the cavity; reentry plan; radioactive species which may be encountered during reentry; public safety considerations arising from release of radioactivity; procedures to assure public safety; and the radiological safety plan. Maximum hypothetical accidents and ecological considerations are discussed in the appendices.

  3. Parent Early Evaluation of Kids: PEEK Outreach Training Project. Final Report.

    Science.gov (United States)

    Squires, Jane; Twombly, Liz; Yockelson, Sue

    This report describes achievements and activities of the Parent Early Evaluation of Kids (PEEK) Outreach Project at the University of Oregon. This project focused on assisting state agencies, regional and tribal entities, and local health and education programs to develop comprehensive, low-cost systems for child-find and referral. Rural and inner…

  4. Evaluation of a workplace engagement project for people with younger onset dementia.

    Science.gov (United States)

    Robertson, Jacinta; Evans, David

    2015-08-01

    In 2011, a workplace project was established to provide a small group of people who had younger onset dementia with the opportunity to return to the workplace. The project sought to explore the feasibility and safety of engaging these younger people in workplace activities if an appropriate framework of support was provided. Opportunities to engage in meaningful activities are quite limited for younger people with dementia because services are targeted at an older client population. A qualitative exploratory approach was used for the project evaluation. Participants were people who were 65 years or younger and had a diagnosis of dementia. They attended a large metropolitan hardware store one day per week and worked beside a store employee for a four hour work shift. Evaluation of the project included observation of participant's engagement in the workplace, adverse events and a qualitative analysis that used participant-nominated good project outcomes. Nine people with a mean age of 58·8 years participated in the project. Six of these participants have been engaged at the workplace for more than two years. All participants were able to gain the skills needed to complete their respective work duties. Participants initially assisted with simple work tasks, but over time, they were able to expand their range of duties to include more complex activities such as customer sales. Participants achieved their nominated good outcomes of improved well-being, engaging in worthwhile activities, contributing to society and socialisation. The evaluation has shown that this workplace programme is a viable model of engagement for younger people with dementia. This evaluation offers a practical demonstration that it is feasible and safe to provide opportunities for younger people with dementia to engage in meaningful activities in the community if appropriate support is provided. © 2015 John Wiley & Sons Ltd.

  5. Evaluating IS/IT Projects: Revealing the Causes of Equivocality

    NARCIS (Netherlands)

    Arviansyah, A.; Spil, Antonius A.M.; van Hillegersberg, Jos

    2013-01-01

    Evaluating IS/IT projects and deciding on their continuation has been hampered by the problem of equivocality. Equivocal situations hinder decision-makers to clearly recognise potential problems and implications of these decisions, as well as to decide the course of action in a purposeful fashion.

  6. The Millennium Villages Project: a retrospective, observational, endline evaluation

    Directory of Open Access Journals (Sweden)

    Shira Mitchell, PhD

    2018-05-01

    Full Text Available Summary: Background: The Millennium Villages Project (MVP was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs. In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. Methods: In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Findings: Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero. Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the

  7. Sexual health promotion on social networking sites: a process evaluation of The FaceSpace Project.

    Science.gov (United States)

    Nguyen, Phuong; Gold, Judy; Pedrana, Alisa; Chang, Shanton; Howard, Steve; Ilic, Olivia; Hellard, Margaret; Stoove, Mark

    2013-07-01

    This article reports findings from an evaluation of reach and engagement of The FaceSpace Project, a novel sexual health promotion project delivered through social networking sites that targeted young people aged 16-29 years. Multiple methods were used to evaluate project reach and engagement. The evaluation focussed on quantitative data (online usage statistics, online surveys), complemented by available qualitative data (project team meeting notes). The project reached 900 fans who were mostly between 18 and 34 years of age. The most successful ways of increasing audience reach were via Facebook advertisements and tagging photos of young people attending a music festival on the project Facebook page. Peaks in Facebook page interactions (comments and "likes") coincided with recruitment peaks and when videos were posted. However, video views varied greatly between postings. Feedback from the project team for increasing engagement in future social networking site interventions included having one centralized Facebook page and using episodic videos. This evaluation is among the first to assess the use of social networking sites for sexual health promotion and provides information to inform the implementation and evaluation of future projects using new media. Social networking sites offer great potential to reach and engage young people for sexual health promotion. However, further work is required to improve implementation and promote audience reach and engagement as well as to determine effectiveness of social networking sites in changing knowledge, attitudes, and behaviors. Copyright © 2013 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  8. Project evaluation for energy supply in rural areas of developing countries

    DEFF Research Database (Denmark)

    Vidal, Rene Victor Valqui; Christensen, J. M.

    1990-01-01

    This paper reports the methodological experiences of the project: Energy Supply Technologies in Developing Countries, carried out in collaboration with the Department of Energy, Zambia. Existing methods for project evaluation, based on cost-benefit analysis, will be briefly presented, particularly...... as regards their inadequacy for assessing energy projects in rural areas.An alternative practical and PC-based approach will be presented in which emphasis is placed on the problem formulation phase, including the socio-economic, cultural and political aspects of the problem. This approach has been prepared...

  9. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  10. Evaluation of the Treatment of Diabetic Retinopathy A Research Project

    Science.gov (United States)

    Kupfer, Carl

    1973-01-01

    Evaluated is the treatment of diabetic retinopathy (blindness due to ruptured vessels of the retina as a side effect of diabetes), and described is a research project comparing two types of photocoagulation treatment. (DB)

  11. Minimum intensity projection technique in the evaluation of pulmonary emphysema

    International Nuclear Information System (INIS)

    Ishii, Chikako; Tada, Shinpei; Fukuda, Kunihiko; Hayashi, Naganobu

    2000-01-01

    Clinically diagnosed 30 pulmonary emphysema patients were evaluated with helical CT. From 10 mm thickness and 10 mm/sec table speed helical CT date set, minimum intensity projection (Min-IP) were generated. Min-IP coronal images were well demonstrated distribution and degree of emphysema. Compared to the high resolution CT images (2 mm thickness), Min-IP images were as same as well evaluated the disease. Min-IP technique seem to be useful for evaluate distribution and degree of pulmonary emphysema. (author)

  12. Service Learning in Medical Education: Project Description and Evaluation

    Science.gov (United States)

    Borges, Nicole J.; Hartung, Paul J.

    2007-01-01

    Although medical education has long recognized the importance of community service, most medical schools have not formally nor fully incorporated service learning into their curricula. To address this problem, we describe the initial design, development, implementation, and evaluation of a service-learning project within a first-year medical…

  13. Construction Projects Focus on Evaluation and Its Benefits by Pre-planning

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    are evaluations carried out? And which trade group focus most on evaluations? The study is based on a questionnaire survey for the most common trade groups in the Danish construction industry, where 167 respondents completed the survey. Findings indicate that the architect’s has most focus on evaluation in both...... internal and external project association; and evaluation has a minor focus for all the respondents where 64.5 % answer that they never, or rarely evaluate; and only a third 34.9 % of the respondents indicate that they evaluate sometimes or frequently....

  14. Project Management in the Universidad de Oriente: Improvement of the Ex-Antes Evaluation

    Directory of Open Access Journals (Sweden)

    Yilian Rodríguez-Clavijo

    2017-06-01

    Full Text Available The objective of this study was to demonstrate the importance of ex-ante evaluation as a tool for the management of science and innovation projects at the Universidad de Oriente. For the theoretical analysis we used the methods analysis - synthesis and historical - logic. In the empirical analysis, participant observation, work with a team of experts and brainstorming were used as techniques and tools. The methodological design of the evaluation was defined according to four aspects established by the Organization for Economic Cooperation and Development: field, purpose, criteria and organization. The results of the application of the methodology are presented to the projects to selected projects; which allowed diagnosing the quality of the projects, the areas with the most deficiencies, as well as the aspects that limit the design of the proposals.

  15. Evaluation of the midwifery pilot projects in Quebec: an overview. L'Equipe d'Evaluation des Projets-Pilotes Sages-Femmes.

    Science.gov (United States)

    Blais, R; Joubert, P

    2000-01-01

    In 1990, the province of Quebec adopted a law authorizing the evaluation of the practice of midwifery through eight pilot projects. The projects, which took the form of birth centres outside hospitals, started operating in 1994. The objectives of the evaluation were 1) to compare midwives' services to current physician services with regard to maternal and neonatal mortality and morbidity, the use of obstetrical intervention, individualization and continuity of care as perceived by clients, and cost; and 2) to identify the professional and organizational factors associated with the integration of midwives into the health care system. A mixed evaluative design was used: a multiple case study with each pilot project representing a case and a cohort study where 1,000 women followed by midwives in the birth centres were matched with 1,000 women followed by physicians in the usual hospital-based services. Various quantitative and qualitative data collection instruments were used. Overall, many results were favourable to midwifery practice, while some were favourable to medical care. Following the evaluation, the Government of Quebec decided to legalize the practice of midwifery.

  16. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  17. The Millennium Villages Project: a retrospective, observational, endline evaluation.

    Science.gov (United States)

    Mitchell, Shira; Gelman, Andrew; Ross, Rebecca; Chen, Joyce; Bari, Sehrish; Huynh, Uyen Kim; Harris, Matthew W; Sachs, Sonia Ehrlich; Stuart, Elizabeth A; Feller, Avi; Makela, Susanna; Zaslavsky, Alan M; McClellan, Lucy; Ohemeng-Dapaah, Seth; Namakula, Patricia; Palm, Cheryl A; Sachs, Jeffrey D

    2018-05-01

    The Millennium Villages Project (MVP) was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs). In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero) and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero). Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the project sites. Total on-site spending decreased from US$132

  18. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  19. JUPITER PROJECT - JOINT UNIVERSAL PARAMETER IDENTIFICATION AND EVALUATION OF RELIABILITY

    Science.gov (United States)

    The JUPITER (Joint Universal Parameter IdenTification and Evaluation of Reliability) project builds on the technology of two widely used codes for sensitivity analysis, data assessment, calibration, and uncertainty analysis of environmental models: PEST and UCODE.

  20. Energy Utilization Evaluation of Carbon Performance in Public Projects by FAHP and Cloud Model

    Directory of Open Access Journals (Sweden)

    Lin Li

    2016-07-01

    Full Text Available With the low-carbon economy advocated all over the world, how to use energy reasonably and efficiently in public projects has become a major issue. It has brought many open questions, including which method is more reasonable in evaluating the energy utilization of carbon performance in public projects when the evaluation information is fuzzy; whether an indicator system can be constructed; and which indicators have more impact on carbon performance. This article aims to solve these problems. We propose a new carbon performance evaluation system for energy utilization based on project processes (design, construction, and operation. Fuzzy Analytic Hierarchy Process (FAHP is used to accumulate the indicator weights and cloud model is incorporated when the indicator value is fuzzy. Finally, we apply our indicator system to a case study of the Xiangjiang River project in China, which demonstrates the applicability and efficiency of our method.

  1. Project W-314 specific test and evaluation plan 241-AN-B valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  2. Evaluation of the Benefits Attributable to Automotive Lightweight Materials Program Research and Development Projects; TOPICAL

    International Nuclear Information System (INIS)

    Das, S

    2001-01-01

    The purpose of this project is to identify and test methods appropriate for estimating the benefits attributable to research and development (R and D) projects funded by the Automotive Lightweight Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). Funded projects range from basic materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R and D projects were chosen for this pilot evaluation: Low-Cost, Continuous Cast Aluminum Sheet; Advanced Forming Technologies for Aluminum; and Manufacturing of Composite Automotive Structures. These projects were chosen because they represent a range of benefits evaluation situations. The first project resulted in an improved process that may be commercialized. The second project is on going and has two distinct components. The third project has yielded an improved technology that has been commercialized. This completed project also benefited from numerous complementary projects

  3. American Fuel Cell Bus Project Evaluation. Second Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  4. American Fuel Cell Bus Project Evaluation: Third Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jeffers, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-05-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB, which was developed as part of the Federal Transit Administration's (FTA) National Fuel Cell Bus Program, was delivered to SunLine in November 2011 and was put in revenue service in mid-December 2011. Two new AFCBs with an upgraded design were delivered in June/July of 2014 and a third new AFCB was delivered in February 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report covers the performance of the AFCBs from July 2015 through December 2016.

  5. Attractiveness Evaluation of Investment in Wind Energy Projects

    Directory of Open Access Journals (Sweden)

    Paulius Rudzkis

    2012-07-01

    Full Text Available Last decade as prices of fossil energy resources were almost constantly going upwards, increasing flow of investments is directed to renewable energy resources. Development and application of green energy became one of priority objectives in many countries. While in the context of wind energy production Lithuania lags behind the EU average, its potential of wind energy usage has great perspective. In this article using random processes, cost-benefit and financial analysis, attractiveness of investment in wind energy projects is examined. Given the stochastic nature of wind energy and by looking into investment profitableness and risk factors, effectiveness of wind turbine is evaluated. Analysis showed that wind energy projects could be considered as having high profit-to-risk factor and should generate significant interest of investment community.

  6. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  7. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  8. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  9. Alternative Evaluation Designs for Data-Centered Technology-Based Geoscience Education Projects

    Science.gov (United States)

    Zalles, D. R.

    2012-12-01

    This paper will present different strategies for how to evaluate contrasting K-12 geoscience classroom-based interventions with different goals, leveraging the first author's experiences as principal investigator of four NSF and NASA-funded geoscience education projects. Results will also be reported. Each project had its own distinctive features but all had in common the broad goal of bringing to high school classrooms uses of real place-based geospatial data to study the relationships of Earth system phenomena to climate change and sustainability. The first project's goal was to produce templates and exemplars for curriculum and assessment designs around studying contrasting geoscience topics with different data sets and forms of data representation. The project produced a near transfer performance assessment task in which students who studied climate trends in Phoenix turned their attention to climate in Chicago. The evaluation looked at the technical quality of the assessment instrument as measured by inter-rater reliability. It then analyzed the assessment results against student responses to the instructional tasks about Phoenix. The evaluation proved useful in pinpointing areas of student strength and weakness on different inquiry tasks, from simple map interpretation to analysis of contrasting claims about what the data indicate. The goal of the second project was to produce an exemplar curriculum unit that bridges Western science and traditional American Indian ecological knowledge for student learning and skill building about local environmental sustainability issues. The evaluation looked at the extent to which Western and traditional perspectives were incorporated into the design of the curriculum. The curriculum was not constructed with a separate assessment, yet evidence centered design was utilized to extrapolate from the exemplar unit templates for future instructional and assessment tasks around other places, other sustainability problems, and

  10. Annual report of the project CIS-03-95, `evaluation of actinide nuclear data`

    Energy Technology Data Exchange (ETDEWEB)

    Maslov, V.M. [Radiation Physics and Chemistry Problems Inst., Minsk-Sosny (Belarus)

    1997-03-01

    The evaluation of neutron data for {sup 243}Cm, {sup 245}Cm and {sup 246}Cm is made in the energy region from 10-5 eV up to 20 MeV. The results of the evaluation are compiled in the ENDF/B-VI format. This work is performed under the Project Agreement CIS-03-95 with the International Science and Technology Center (Moscow). This is the annual report of the project CIS-03-95. (author)

  11. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  12. Is Project Towards No Drug Abuse (Project TND) an evidence-based drug and violence prevention program? A review and reappraisal of the evaluation studies.

    Science.gov (United States)

    Gorman, Dennis M

    2014-08-01

    This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.

  13. Collaborative International Evaluated Library Organisation Pilot Project. CIELO meeting, NEA Headquarters, 18-20 May 2015

    International Nuclear Information System (INIS)

    Mattoon, Caleb; Brown, David; Trkov, Andrej; Plompen, Arjan; Hawari, Ayman I.; Roubtsov, Danila; Kim, Do Heon; Bauge, Eric; Palmiotti, Giuseppe; Kessedjian, Gregoire; Conlin, Jeremy Lloyd; Qian, Jing; Leal, Luiz Carlos; Chadwick, Mark; Herman, Michal Wladyslaw; White, Morgan C.; Cabellos, Oscar; Romain, Pascal; Schillebeeckx, Peter; Ichou, Raphaelle; Jacqmin, Robert; Hilaire, Stephane; Danon, Yaron; Ge, Zhigang; Malvagi, Fausto; Kahler, Albert C. Skip; Morillon, Benjamin; Mcnabb, Dennis P.; Oleynik, Dmitry S.; Wu, Haicheng; Marquez Damian, Jose Ignacio; Yokoyama, Kenji; Dunn, Michael; Cho, Young-Sik; Pignet, Sophie; Ignatyuk, Anatoly V.; Leeb, Helmut; Wang, Wenming; Ruan, Xichao

    2015-05-01

    WPEC subgroup 40-CIELO (Collaborative International Evaluated Library Organization) provides a new working paradigm to facilitate evaluated nuclear reaction data advances. It brings together experts from across the international nuclear reaction data community to identify and document discrepancies among existing evaluated data libraries, measured data, and model calculation interpretations, and aims to make progress in reconciling these discrepancies to create more accurate ENDF-formatted files. SG40-CIELO focusses on 6 important isotopes: "1H, "1"6O, "5"6Fe, "2"3"5","2"3"8U, "2"3"9Pu. This document is the proceedings of the CIELO meeting, held at the NEA Headquarters on 18-20 May 2015. It comprises all the available presentations (slides) given by the participants: A - CIELO project: - 1: Status of Cross Section Progress (M. Chadwick); - 2: Update on CIELO Related Measurements at RPI (Y. Danon); - 3: IAEA-NDS and the CIELO Project (A. Trkov); - 4: LANL Criticality Data Testing using CIELO Candidate Evaluations (S. Kahler); - 5: ENDF/B-VII.1 vs. CIELO (R. Cullen); B - O"1"6: - 6: n+"1"6O (A. Plompen); - 7: Resonance Evaluations for "1"6O for the CIELO Project (L. Leal); - 8: Validation of Leal and Hale O-16 Evaluations against FNS/JAEA Liquid Oxygen ToF Benchmark (I. Kodeli); - 9: Cierjacks 1968, Cierjacks 1980 and RPI 2015 (C.R. Lubitz); - 10: O"1"6 Items (C.R. Lubitz); C - Fe"5"6: - 11: Iron in fast neutron range, beta-0 evaluation for "5"6Fe (M. Herman); - 12: Data Evaluation at ORNL (L. Leal); - 13: IAEA-NDS and the CIELO Project Fe-56 (A. Trkov); - 14: The evaluation of experimental data in fast range for "5"6Fe (Z. Ge); D - H1 - 15: Reactivity effect of New Light and Heavy Water TSL on Critical Systems (J.I. Marquez); E - Big3: - 16: Resonance Evaluations of "2"3"5U for the CIELO Project (L. Leal); - 17: IAEA-NDS and the CIELO Project U-235 (A. Trkov); - 18: Status of "2"3"5U CIELO evaluation (B. Morillon); - 19: U"2"3"5 Items (C.R. Lubitz); - 20: Fission

  14. Core Abilities Evaluation Index System Exploration and Empirical Study on Distributed PV-Generation Projects

    Directory of Open Access Journals (Sweden)

    Lin He

    2017-12-01

    Full Text Available In line with the constraints of environmental problems and economic development, large-scale renewable-generation projects have been planned and constructed in recent years. In order to achieve sustainable power development and improve the power supply structure, China’s government has focused on distributed photovoltaic (PV generation projects due to their advantages of clean emission and local consumption. However, their unstable output power still brings a series of problems concerning reliability, investment income, and available substitution proportion to traditional power, and so on. Therefore, it is imperative to understand the competitive development abilities of distributed PV generation projects and measure them effectively. First, through various investigation methods such as literature reviews, feasibility report analysis and expert interviews, the factors that influence the core abilities of distributed PV-generation projects were explored based on the micro-grid structure. Then, with the indexed exploration results, the factors were classified into 6 dimensions, i.e., investment and earning ability, production and operation ability, power-grid coordination ability, energy-conservation and emission-reduction ability, sustainable development ability, and society-serving ability. Meanwhile, an evaluation index system for core abilities of distributed PV-generation project was constructed using all quantitative indicators. Third, for examining the availability of the evaluation index system, combination weighting and techniques for order preference by similarity to an ideal solution (TOPSIS methods were adopted to assess the practical distributed PV-generation projects. The case study results showed that installed capacity, local economy development, and grid-connected power quantity will influence the core abilities of distributed PV-generation project, obviously. The conclusions of the evaluation analysis on core abilities can

  15. International evaluation of Swedish research projects in the field of short rotation forestry for energy

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, W M [N.I. Horticulture and Plant Breeding Station, Armagh (Ireland); Isebrands, J [USDA Forest Service, North Central Forest Experiment Station, Rhinelander, WI (United States); Namkoong, G [Univ. of British Columbia, Vancouver, BC (Canada). Dept. of Forest Sciences; Tahvanainen, J [Univ. of Joensuu (Finland). Dept. of Biology

    1996-11-01

    The purpose of this evaluation was to inform NUTEK of the scientific quality of the research projects, as seen in an international context. The projects were therefore the main elements considered in the evaluation. The main basis of the evaluation was the scientific quality of the research and its relevance to NUTEK`s aims in the application of industrial research and development. The present report is based on the information contained in the written reports submitted by the grant holders, site visits and discussions between the grant holders and the Committee. The report first gives an overview and general recommendations concerning the overall programme in the field of Short Rotation Forestry for Energy. Thereafter, the 16 projects are evaluated separately

  16. Economic and environmental evaluation of investment projects of biogas plants

    International Nuclear Information System (INIS)

    Guzmán Marrero, Elizabeth; Guzmán Chinea, Jesús Manuel; Mata Varela, Milagros C.; Pérez González, Yanet

    2015-01-01

    The economic evaluation of the implementation and use of renewable energy is an issue of paramount importance and has been approached from different perspectives by different authors in different countries. Biogas technology has its own characteristics that make it more complex analysis involved not only in this case the energy aspect but there is also a significant impact on health assessment difficult, fertilization, soil improvement, animal feed and improved conditions of life. The capital budgeting, in conjunction with the planning process, is a key economic tool for decision making and in turn represents an ongoing challenge for the agricultural sector. It is a necessity of our country, together with the entire world, potentiate the action to correct management of organic waste generated in intensive pig farming, to contribute to the reduction of environmental impacts that this work causes. Studies in this area show the shortcomings that exist in Cuban law established for the evaluation of investment projects, both in its structure and in its cycle, without taking into account important elements such as risk analysis. This research evaluates the economic and financial feasibility of an investment project, including a social and environmental assessment of the same financial justification for the inclusion of risk analysis in the evaluation process (full text)

  17. The Fort McMurray Demonstration Project in Social Marketing: theory, design, and evaluation.

    Science.gov (United States)

    Guidotti, T L; Ford, L; Wheeler, M

    2000-02-01

    The Fort McMurray Demonstration Project in Social Marketing is a multifaceted program that applies the techniques of social marketing to health and safety. This paper describes the origins of the project and the principles on which it was based. VENUE: Fort McMurray, in the province of Alberta, Canada, was selected because the community had several community initiatives already underway and the project had the opportunity to demonstrate "value added." The project is distinguished from others by a model that attempts to achieve mutually reinforcing effects from social marketing in the community as a whole and from workplace safety promotion in particular. Specific interventions sponsored by the project include a media campaign on cable television, public activities in local schools, a community safety audit, and media appearance by a mascot that provides visual identity to the project, a dinosaur named "Safetysaurus." The project integrated its activities with other community initiatives. The evaluation component emphasizes outcome measures. A final evaluation based on injury rates and attitudinal surveys is underway. Baseline data from the first round of surveys have been compiled and published. In 1995, Fort McMurray became the first city in North America to be given membership in the World Health Organization's Safe Community Network.

  18. A critical evaluation of the strategy project

    International Nuclear Information System (INIS)

    Howard, B.J.; Liland, A.

    2003-01-01

    Full text: Experience after the Chernobyl accident has shown that remediation strategies need to consider a wide range of different issues to ensure the long-term sustainability of radioactively contaminated areas. The STRATEGY project (Sustainable Restoration And Long-Term Management Of Contaminated Rural, Urban And Industrial Ecosystems (www.strategy-ec.org.uk) had the overall objective of establishing a holistic decision framework for the selection of optimal remediation strategies for long-term sustainable management of contaminated areas in Western Europe. The project carried out a critical evaluation of a series of countermeasures and waste disposal options including a consideration of their technical feasibility and practicality and whether they (i) incur considerable direct or side-effect costs; (ii) have significant environmental side effects; and (iii) are acceptable to society. A main output was a comprehensive, documented evaluation of more than 100 countermeasures (in the form of standardized templates) that would be relevant for off-site nuclear emergency management in the mid to long term. Stakeholder participation is an important mechanism to explore these additional benefits or disadvantages to the use of countermeasures, and is an essential step in developing a decision framework which avoids problems previously experienced in emergency management. Close liaison with the FARMING stakeholder network facilitated evaluation of countermeasure templates for rural ecosystems. Stakeholder opinion suggested that some countermeasures were as likely to be rejected an socio-ethical grounds as technical and economic grounds. Rejection of specific countermeasures would be expected to show site, context and national differences. Suitable approaches for successfully communicating with a wide range of stakeholders were explored. The way in which countermeasure evaluation and selection is carried out is particularly relevant for ethical evaluation of remediation

  19. Introducing a New Learning and Teaching Evaluation Planning Framework for Small Internally Funded Projects in Higher Education

    Science.gov (United States)

    Huber, Elaine

    2017-01-01

    Scholarly evaluation practices in learning and teaching projects are under-reported in the literature. In order for robust evaluative measures to be implemented, a project requires a well-designed evaluation plan. This research study describes the development of a practical evaluation planning framework through an action research approach, using…

  20. Evaluated Data Projects at the NEA

    International Nuclear Information System (INIS)

    Henriksson, H.; Rugama, Y.

    2006-01-01

    The OECD Nuclear Energy Agency (NEA) Data Bank is part of an international network of data centres in charge of the compilation and dissemination of basic nuclear data. The NEA offers easy access to the main nuclear databases with bibliographical information, evaluated libraries, e.g. the Joint Evaluated Fission and Fusion (JEFF) library, and experimental data in the EXFOR database, comprising published neutron induced as well as charged particle induced nuclear reaction data. The NEA Working Party on international nuclear data Evaluation Co-operation (WPEC) is established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations and validation. WPEC provides a framework for co-operative activities between six major evaluation projects (BROND, CENDL, Endf, FENDL, JEFF and JENDL). The NEA Data Bank administrates the collection and validation as well as the distribution of the JEFF library. The latest version, JEFF-3.1, was released in May 2005 and it contains a neutron data library, a proton data library and thermal scattering law data. The special purpose library on activation data contains 774 nuclei with over 12600 neutron induced reactions. Included is also radioactive decay data, with 3852 isotopes, and spontaneous and neutron induced fission yield data. The full documentation of the library is being prepared for publication in 2006. Processed JEFF-3.1 data files in ACE format, mainly for reactor physics applications, have been prepared and were distributed in spring 2006 with documentation. The processed files have been validated for criticality calculations, as well as for radiation physics application. The detailed analysis of the validation results will be very useful for improving the accuracy of evaluated data libraries. The display program JANIS has been developed at the NEA, and the latest version (JANIS-2.21) was released in October 2005. JANIS is designed to facilitate the visualisation and

  1. The Planning, Implementation and Evaluation of a Character-Based School Culture Project in Taiwan

    Science.gov (United States)

    Lee, Chi-Ming

    2009-01-01

    This study focused on the planning, implementation and evaluation of a character-based school culture (CBSC) project in Taiwan. The project integrated the principles of justice, caring and developmental discipline and was influenced by several well-known American models of character education programmes. The CBSC project was conducted in a…

  2. [Outcomes evaluation of the school staff health promotion project].

    Science.gov (United States)

    Woynarowska-Sołdan, Magdalena

    This article presents selected outcomes of a 3-year project "Health promotion of school staff in health-promoting schools," as well as the achievements and difficulties in its implementation. The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62-93%) and the physical and social environment of the school (50-92%). Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2):187-200. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  3. Outcomes evaluation of the school staff health promotion project

    Directory of Open Access Journals (Sweden)

    Magdalena Woynarowska-Sołdan

    2016-04-01

    Full Text Available Background: This article presents selected outcomes of a 3-year project “Health promotion of school staff in health-promoting schools,” as well as the achievements and difficulties in its implementation. Material and Methods: The research was conducted on 644 teachers and 226 members of non-teaching staff in 21 schools. The method involved opinion poll and authored questionnaires. A 2-part model of outcome evaluation was developed. Results: Most participants appreciated the changes that took place within the 3 years of the project implementation. These included the improved level of their knowledge about health, health-conducive behaviors (62–93% and the physical and social environment of the school (50–92%. Changes were more frequently acknowledged by teachers. About 80% of the participants had a positive attitude to the project, but only 20% assessed their involvement as considerable. About 90% believed that health promotion activities should be continued. According to the project leaders, insufficient support and financial resources, and difficulties in motivating school employees, particularly the nonteaching staff, to undertake health-promotion activities were the major handicaps in the project implementation. Conclusions: The project outcomes can be assessed as satisfying. They revealed that it is posssible to initiate health promotion among school staff. This can be effective on condition that participants are motivated, actively engaged in the project and supported by the head teacher and the local community. Necessarily, school leaders should be prepared to promote health among adults and to gain support from school policy decision makers, school administration, trade unions and universities involved in teacher training. Med Pr 2016;67(2:187–200

  4. Methodology evaluation of innovative projects under risk and uncertainty

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available This article deals with problems connected with the assessment of innovative projects in the context of risk and uncertainty, topical issues of evaluation of innovative projects at the present stage of development of the Russian economy. By the example of the solution of the "crossing the river" is considering the possibility of using hierarchical models to address it. In what follows, and compares the priorities of different groups of factors are given by calculating the overall costs and benefits. The paper provides a rationale for combined use of four aspects: the beneficial aspects of the decision (the benefits and opportunities and negative (costs and risks that may lead to the decision in question.

  5. A Quantitative Measure For Evaluating Project Uncertainty Under Variation And Risk Effects

    Directory of Open Access Journals (Sweden)

    A. Chenarani

    2017-10-01

    Full Text Available The effects of uncertainty on a project and the risk event as the consequence of uncertainty are analyzed. The uncertainty index is proposed as a quantitative measure for evaluating the uncertainty of a project. This is done by employing entropy as the indicator of system disorder and lack of information. By employing this index, the uncertainty of each activity and its increase due to risk effects as well as project uncertainty changes as a function of time can be assessed. The results are implemented and analyzed for a small turbojet engine development project as the case study. The results of this study can be useful for project managers and other stakeholders for selecting the most effective risk management and uncertainty controlling method.

  6. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  7. The International Criticality Safety Benchmark Evaluation Project (ICSBEP)

    International Nuclear Information System (INIS)

    Briggs, J.B.

    2003-01-01

    The International Criticality Safety Benchmark Evaluation Project (ICSBEP) was initiated in 1992 by the United States Department of Energy. The ICSBEP became an official activity of the Organisation for Economic Cooperation and Development (OECD) - Nuclear Energy Agency (NEA) in 1995. Representatives from the United States, United Kingdom, France, Japan, the Russian Federation, Hungary, Republic of Korea, Slovenia, Yugoslavia, Kazakhstan, Israel, Spain, and Brazil are now participating. The purpose of the ICSBEP is to identify, evaluate, verify, and formally document a comprehensive and internationally peer-reviewed set of criticality safety benchmark data. The work of the ICSBEP is published as an OECD handbook entitled 'International Handbook of Evaluated Criticality Safety Benchmark Experiments.' The 2003 Edition of the Handbook contains benchmark model specifications for 3070 critical or subcritical configurations that are intended for validating computer codes that calculate effective neutron multiplication and for testing basic nuclear data. (author)

  8. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  9. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  10. Improving Quality Assurance with CDIO Self-Evaluation: Experiences From a Nordic Project

    DEFF Research Database (Denmark)

    Kontio, Juha; Roslöf, Janne; Edström, Kristina

    2012-01-01

    The main goal of the Nordic project Quality Assurance in Higher Education was to develop and implement a self-evaluation model in the participating Higher Education Institutes (HEIs) to support their quality assurance work and continuous curriculum development. Furthermore, the project aimed...... programme and new ideas and support for quality assurance work in other higher education institutes have been produced....

  11. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken

  12. Photovoltaic projects for decentralized power supply in India: A financial evaluation

    International Nuclear Information System (INIS)

    Nouni, M.R.; Mullick, S.C.; Kandpal, T.C.

    2006-01-01

    The present study concentrates on photovoltaic (PV) projects for providing decentralized power supply in remote locations in India. Results of a techno-economic evaluation are presented. Some PV projects in the capacity range 1-110 kW p , that have either been implemented or are under implementation, have been considered. An analysis of the capital cost of the PV projects and sub-systems has been undertaken. Levelized unit cost of electricity (LUCE) has been estimated for eighteen select locations situated in different geographical regions of the country. The LUCE is found to vary in the range of Rs. 28.31-59.16/kW h (US$ 0.65-1.35/k Wh) for PV projects in the capacity range 1-25 kW p . In view of high unit cost of electricity from PV projects, need for financial incentives has been examined from the perspective of users. A sensitivity analysis has also been undertaken. (Author)

  13. Evaluation of the AccessIT Project and the Distance LearningProgramme on Digitization

    Directory of Open Access Journals (Sweden)

    Bülent Yılmaz

    2013-11-01

    Full Text Available AccessIT is an EU-funded project under EU’s Education and Culture Program aiming to digitize a certain amount of sources that are part of the cultural heritage, to transfer them to Europeana, and to sustain the education infrastructure to achieve this goal in the partner countries of Greece, Poland, Serbia, Turkey and UK. In this study, in addition to the general evaluation of the AccessIT Project, it is aimed to investigate the awareness of participants in thefield on digitization and digital content management, their self-efficiency perceptions, and to evaluate the education program based on the data acquired from the survey of544participants who were enrolled in the distance education program offered within the scope of the project.It was found out in the study that the AccessIT Project has had an important function in Turkey and the distance education program significantly contributed to participants ’ self-efficiency perceptions about digitization.

  14. International Criticality Safety Benchmark Evaluation Project (ICSBEP) - ICSBEP 2015 Handbook

    International Nuclear Information System (INIS)

    Bess, John D.

    2015-01-01

    The Criticality Safety Benchmark Evaluation Project (CSBEP) was initiated in October of 1992 by the United States Department of Energy (DOE). The project quickly became an international effort as scientists from other interested countries became involved. The International Criticality Safety Benchmark Evaluation Project (ICSBEP) became an official activity of the Nuclear Energy Agency (NEA) in 1995. This handbook contains criticality safety benchmark specifications that have been derived from experiments performed at various critical facilities around the world. The benchmark specifications are intended for use by criticality safety engineers to validate calculation techniques used to establish minimum subcritical margins for operations with fissile material and to determine criticality alarm requirements and placement. Many of the specifications are also useful for nuclear data testing. Example calculations are presented; however, these calculations do not constitute a validation of the codes or cross-section data. The evaluated criticality safety benchmark data are given in nine volumes. These volumes span approximately 69000 pages and contain 567 evaluations with benchmark specifications for 4874 critical, near-critical or subcritical configurations, 31 criticality alarm placement/shielding configurations with multiple dose points for each, and 207 configurations that have been categorised as fundamental physics measurements that are relevant to criticality safety applications. New to the handbook are benchmark specifications for neutron activation foil and thermoluminescent dosimeter measurements performed at the SILENE critical assembly in Valduc, France as part of a joint venture in 2010 between the US DOE and the French Alternative Energies and Atomic Energy Commission (CEA). A photograph of this experiment is shown on the front cover. Experiments that are found unacceptable for use as criticality safety benchmark experiments are discussed in these

  15. International Reactor Physics Experiment Evaluation (IRPhE) Project. IRPhE Handbook - 2017 edition

    International Nuclear Information System (INIS)

    2017-01-01

    The International Reactor Physics Evaluation (IRPhE) Project was initiated as a pilot in 1999 by the Nuclear Energy Agency (NEA) Nuclear Science Committee (NSC). The project was endorsed as an official activity of the NSC in June 2003. While the NEA co-ordinates and administers the IRPhE Project at the international level, each participating country is responsible for the administration, technical direction and priorities of the project within their respective countries. The information and data included in this handbook are available to NEA member countries, to all contributing countries and to others on a case-by-case basis. The IRPhE Project is patterned after the International Criticality Safety Benchmark Evaluation Project (ICSBEP). It closely co-ordinates with the ICSBEP to avoid duplication of efforts and publication of conflicting information. Some benchmark data are applicable to both nuclear criticality safety and reactor physics technology. Some have already been evaluated and published by the ICSBEP, but have been extended to include other types of measurements in addition to the critical configuration. Through this effort, the IRPhE Project will be able to 1) consolidate and preserve the existing worldwide information base; 2) retrieve lost data; 3) identify areas where more data are needed; 4) draw upon the resources of the international reactor physics community to help fill knowledge gaps; 5) identify discrepancies between calculations and experiments due to deficiencies in reported experimental data, cross-section data, cross-section processing codes and neutronics codes; 6) eliminate a large amount of redundant research and processing of reactor physics experiment data, and 7) improve future experimental planning, execution and reporting. This handbook contains reactor physics benchmark specifications that have been derived from experiments performed at nuclear facilities around the world. The benchmark specifications are intended for use by

  16. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)

  17. GROWTH OF THE INTERNATIONAL CRITICALITY SAFETY AND REACTOR PHYSICS EXPERIMENT EVALUATION PROJECTS

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; John D. Bess; Jim Gulliford

    2011-09-01

    Since the International Conference on Nuclear Criticality Safety (ICNC) 2007, the International Criticality Safety Benchmark Evaluation Project (ICSBEP) and the International Reactor Physics Experiment Evaluation Project (IRPhEP) have continued to expand their efforts and broaden their scope. Eighteen countries participated on the ICSBEP in 2007. Now, there are 20, with recent contributions from Sweden and Argentina. The IRPhEP has also expanded from eight contributing countries in 2007 to 16 in 2011. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Criticality Safety Benchmark Experiments1' have increased from 442 evaluations (38000 pages), containing benchmark specifications for 3955 critical or subcritical configurations to 516 evaluations (nearly 55000 pages), containing benchmark specifications for 4405 critical or subcritical configurations in the 2010 Edition of the ICSBEP Handbook. The contents of the Handbook have also increased from 21 to 24 criticality-alarm-placement/shielding configurations with multiple dose points for each, and from 20 to 200 configurations categorized as fundamental physics measurements relevant to criticality safety applications. Approximately 25 new evaluations and 150 additional configurations are expected to be added to the 2011 edition of the Handbook. Since ICNC 2007, the contents of the 'International Handbook of Evaluated Reactor Physics Benchmark Experiments2' have increased from 16 different experimental series that were performed at 12 different reactor facilities to 53 experimental series that were performed at 30 different reactor facilities in the 2011 edition of the Handbook. Considerable effort has also been made to improve the functionality of the searchable database, DICE (Database for the International Criticality Benchmark Evaluation Project) and verify the accuracy of the data contained therein. DICE will be discussed in separate papers at ICNC 2011. The status of the

  18. Evaluation model based on FAHP for nuclear power project contract performance

    International Nuclear Information System (INIS)

    Liu Bohang; Cheng Jing

    2012-01-01

    Fuzzy Comprehensive Evaluation is a common tool to analyze comprehensive integration. Fuzzy Analytic Hierarchy Process is an improvement for Analytic Hierarchy Process. Firstly the paper pointed out the concept of FAHP, and then used FAHP to setup an evaluation system model for nuclear power project contract performance. Based on this model, all the evaluation factors were assigned to different weightiness. By weighting the score of each factor, output would be the result which could evaluate the contract performance. On the basis of the research, the paper gave the principle of evaluating contract performance of nuclear power suppliers, which can assure the procurement process. (authors)

  19. Report on Evaluation of Tender for the Valentine Iron Ore Project in Uruguay

    International Nuclear Information System (INIS)

    1981-01-01

    This report prepared by Dastur Engineering International GmbH (DEI)Consulting Engineers, Dusseldorf at the instance of United Nations Industrial Development Organization (UNIDO) seeks to present an evaluation of the feasibility study presented by Republica Oriental del Uruguay, Ministerio de Industria y- Energia (Project Authority) by the Brazilian Consortium (comprising Tenenga, Coferraz, Cimetal and Interbras) along with a project BID including financing possibilities. In accordance with the contract requirements, this Draft Final Report is being submitted. Based on the comments to be received on the findings incorporated in this Draft Final Report from UNIDO and Project Authorities in Uruguay, the Final Report will be prepared and submitted to UNIDO in accordance with the time schedule stipulated in the contract between UNIDO and DEI. The aims of the Project are:a) The development objective is the utilisation of the country's natural resources by exploiting the iron ore deposits of Valentines, for iron and steel production. b)The immediate objective is to evaluate the tenders for the execution of a project to undertake the industrial exploitation of the iron or deposits in close co-operation and co-ordination with the Uruguayan authorities.

  20. THE MODEL OF EXPERT SYSTEM FOR SCIENTIFIC PROJECTS EVALUATION IN HIGHER EDUCATIONAL INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2015-05-01

    Full Text Available There have been proposed the model of the expert system for the assessment of research projects in higher educational institutions, based on estimates of probability. It allows to rank alternative projects and scenarios. The model is implemented through the software "Small expert system." The principle of calculating the probability of approval of research projects, which form the basis of the expert system, is based on Bayes' theorem. Expert system calculates the probability of approval of research projects by Ministry of Science and Education on the basis of the responses to questions about the content of the request for the execution of research projects. Questions are formed on the basis of the criteria by which experts of state authorities evaluate scientific research projects.

  1. Improvement of methods of evaluation of investment projects in the context of import substitution

    Directory of Open Access Journals (Sweden)

    Kuvshinov M.S.

    2017-01-01

    Full Text Available Due to the imposition of sanctions, based more on geopolitical interests, there were additional essential restrictions on sources of external credits, use of import raw materials and technologies, possibilities of attraction to work of the qualified employees which do not have the Russian nationality, participation in the international technology and scientific projects. At similar restrictions of different resources investment decisions are made extremely carefully, and especially careful and reasonable efficiency evaluation of the investments is required. Traditionally used techniques of efficiency evaluation of investment projects not fully consider strategic interests of owners of industrial enterprises and investors. Decrease in risks requires higher quality of project evaluation. In this work the method of multi-level consistently complex integral assessment of investment projects on an indicator of the integral indicator of their efficiency implementing consecutive selection of investment projects from a portfolio on essential indicators of commercial effectiveness, efficiency of production business activities, a financial state and productivity of activity is provided. The developed method of a complex assessment of investment projects is implemented for practical application by the software product allowing to create on the basis of economic-mathematical modeling specific recommendations in economic practice of industrial enterprises during the developing and implementation of investment strategies. The conclusion that for the Russian economy in the conditions of import substitution accounting of all set of interests of investors and owners of the enterprises provides development and implementation of reasonable investment strategies is drawn.

  2. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  3. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  4. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  5. Project Evaluation and Cash Flow Forecasting by Stochastic Simulation

    Directory of Open Access Journals (Sweden)

    Odd A. Asbjørnsen

    1983-10-01

    Full Text Available The net present value of a discounted cash flow is used to evaluate projects. It is shown that the LaPlace transform of the cash flow time function is particularly useful when the cash flow profiles may be approximately described by ordinary linear differential equations in time. However, real cash flows are stochastic variables due to the stochastic nature of the disturbances during production.

  6. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  7. Expedited Permanency Planning: Evaluation of the Kentucky Adoptions Opportunities Project.

    Science.gov (United States)

    Martin, Mavin H.; Barbee, Anita P.; Antle, Becky F.; Sar, Bibhuti

    2002-01-01

    Presents evaluation findings of a 3-year Kentucky Adoptions Opportunities Project. Notes that a majority of children had one or both parents coping with multiple risk factors including mental illness, substance abuse, mental retardation, or family violence. Discusses major barriers to permanency, as well as policy and practice implications in the…

  8. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  9. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  10. Steep cut slope composting : field trials and evaluation : project summary report.

    Science.gov (United States)

    2011-04-01

    This project is a continuation of earlier work performed by Montana State University (Jennings et al. 2007) evaluating compost application on, and incorporation into, soils on steep cut slopes for the Montana Department of Transportation (MDT). The e...

  11. The first technical report for the improvement of R and D evaluation : Focusing on the evaluation reaction of R and D project investigator

    Energy Technology Data Exchange (ETDEWEB)

    Yeo, Ji Won; Kim, I.C.; Won, B.C.; Kim, M.R. [Korea Atomic Energy Research Institute, Taejon (Korea)

    1997-12-01

    The main objectives of this report are as follows. - Measuring the project manager's reaction on R and D evaluation and determining its influencing factors. - Testing the relationship between personal characteristics (tolence for ambiguity, risk-taking propensity, self-efficacy, Turn-over intention) and the outcome of Project Evaluation. - Presenting the useful information related to rebuilding a R and D Evaluation System of KAERI (Korea Atomic Energy Research Institute). 72 refs., 6 figs., 41 tabs. (Author)

  12. Long-Term Evaluation of SSL Field Performance in Select Interior Projects

    Energy Technology Data Exchange (ETDEWEB)

    Perrin, Tess E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-02-28

    This GATEWAY project evaluated four field installations to better understand the long-term performance of a number of LED products, which can hopefully stimulate improvements in designing, manufacturing, specifying, procuring, and installing LED products. Field studies provide the opportunity to discover and investigate issues that cannot be simulated or uncovered in a laboratory, but the installed performance over time of commercially available LED products has not been well documented. Improving long-term performance can provide both direct energy savings by reducing the need to over-light to account for light loss and indirect energy savings through better market penetration due to SSL’s competitive advantages over less-efficient light source technologies. The projects evaluated for this report illustrate that SSL use is often motivated by advantages other than energy savings, including maintenance savings, easier integration with control systems, and improved lighting quality.

  13. Evaluation of the Project Management Competences Based on the Semantic Networks

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta BODEA

    2008-01-01

    Full Text Available The paper presents the testing and evaluation facilities of the SinPers system. The SinPers is a web based learning environment in project management, capable of building and conducting a complete and personalized training cycle, from the definition of the learning objectives to the assessment of the learning results for each learner. The testing and evaluation facilities of SinPers system are based on the ontological approach. The educational ontology is mapped on a semantic network. Further, the semantic network is projected into a concept space graph. The semantic computability of the concept space graph is used to design the tests. The paper focuses on the applicability of the system in the certification, for the knowledge assessment, related to each element of competence. The semantic computability is used for differentiating between different certification levels.

  14. Test and evaluation plan for Project W-314 tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The ''Tank Farm Restoration and Safe Operations'' (TFRSO), Project W-314 will restore and/or upgrade existing Hanford Tank Farm facilities and systems to ensure that the Tank Farm infrastructure will be able to support near term TWRS Privatization's waste feed delivery and disposal system and continue safe management of tank waste. The capital improvements provided by this project will increase the margin of safety for Tank Farms operations, and will aid in aligning affected Tank Farm systems with compliance requirements from applicable state, Federal, and local regulations. Secondary benefits will be realized subsequent to project completion in the form of reduced equipment down-time, reduced health and safety risks to workers, reduced operating and maintenance costs, and minimization of radioactive and/or hazardous material releases to the environment. The original regulatory (e.g., Executive Orders, WACS, CFRS, permit requirements, required engineering standards, etc.) and institutional (e.g., DOE Orders, Hanford procedures, etc.) requirements for Project W-314 were extracted from the TWRS S/RIDs during the development of the Functions and Requirements (F and Rs). The entire family of requirements were then validated for TWRS and Project W-314. This information was contained in the RDD-100 database and used to establish the original CDR. The Project Hanford Management Contract (PHMC) team recognizes that safety, quality, and cost effectiveness in the Test and Evaluation (T and E) program is achieved through a planned systematic approach to T and E activities. It is to this end that the Test and Evaluation Plan (TEP) is created. The TEP for the TFRSO Project, was developed based on the guidance in HNF-IP-0842, and the Good Practice Guide GPG-FM-005, ''Test and Evaluation,'' which is derived from DOE Order 430.1, ''Life Cycle Asset Management.'' It describes the Test and Evaluation program for the TFRSO project starting with the definitive design phase and ending

  15. Evaluation of the RAIN project

    International Nuclear Information System (INIS)

    Stuanes, A.; Dickson, W.; Jenkins, A.; Rasmussen, L.; Stordal, F.

    1991-11-01

    This report presents a scientific assessment of the RAIN project. It describes the main hypotheses tested and the applied methods. The major results of the research are highlighted and discussed, and they are placed in the perspective of national and international acid rain research. An important part of the RAIN project has been to provide information to the public about the acid rain problem, and in this way it has performed an important background role in influencing political decisions and legislation. The RAIN project is regarded as a cost effective research effort, and the novel approach and capital investment will enable further manipulation studies at these sites in the future. It is recommended that the project is continued in the immediate future, with some modification to answer specific questions resulting from the collected data. 24 refs., 6 figs., 1 tab

  16. Research on evaluating water resource resilience based on projection pursuit classification model

    Science.gov (United States)

    Liu, Dong; Zhao, Dan; Liang, Xu; Wu, Qiuchen

    2016-03-01

    Water is a fundamental natural resource while agriculture water guarantees the grain output, which shows that the utilization and management of water resource have a significant practical meaning. Regional agricultural water resource system features with unpredictable, self-organization, and non-linear which lays a certain difficulty on the evaluation of regional agriculture water resource resilience. The current research on water resource resilience remains to focus on qualitative analysis and the quantitative analysis is still in the primary stage, thus, according to the above issues, projection pursuit classification model is brought forward. With the help of artificial fish-swarm algorithm (AFSA), it optimizes the projection index function, seeks for the optimal projection direction, and improves AFSA with the application of self-adaptive artificial fish step and crowding factor. Taking Hongxinglong Administration of Heilongjiang as the research base and on the basis of improving AFSA, it established the evaluation of projection pursuit classification model to agriculture water resource system resilience besides the proceeding analysis of projection pursuit classification model on accelerating genetic algorithm. The research shows that the water resource resilience of Hongxinglong is the best than Raohe Farm, and the last 597 Farm. And the further analysis shows that the key driving factors influencing agricultural water resource resilience are precipitation and agriculture water consumption. The research result reveals the restoring situation of the local water resource system, providing foundation for agriculture water resource management.

  17. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    Science.gov (United States)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  18. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  19. Analysis of energy consumption, indoor climate, occupant satisfaction and overall evaluation of the project

    DEFF Research Database (Denmark)

    Zanghirella, Fabio; Thomsen, Kirsten Engelund; Knudsen, Henrik Nellemose

    . Deliverable 23 Deliverable 23 is a deliverable produced as part of the final reporting of the project. It is meant to provide an overview of energy consumption analysis, indoor climate and occupants satisfaction investigations and an overall evaluation of the project. The distribution is public....

  20. Regional Development and Management of Sunk Capital: Some Issues in Project Evaluation

    OpenAIRE

    Gyles, Oliver

    1995-01-01

    Government intervention aimed at regional development can be justified where there are opportunities for profitable investement of public funds. Benefit: cost analysis can be an effective tool for economic evaluation of regional development project proposals, providcd the distinction between sunk costs and historical outlays is recognised. Because the cost of previous development is sunk, it is appropriate to value existing assets at their opportunity cost. In terms or ex ante project apprais...

  1. Economic evaluation of environmental impacts of open cast mining project - an approach

    International Nuclear Information System (INIS)

    Maiti, S.K.; Pathak, K.

    1998-01-01

    Economic valuation of environmental attributes are pragmatic approach to evaluating the impacts and it helps decision makers to arrive at objective decisions on the basis of cost benefit ratio. For determining the physical impact and its quantification, four evaluation methods, namely-market price method, surrogate market price, survey based and cost based approaches are generally used. The present paper reviews the importance of environmental evaluation of impacts of mining and also reviews a few suitable methodologies that could be effectively used for economic evaluation of environmental impacts in open cast mining projects. (author)

  2. Project monitoring and evaluation: an enhancing method for health research system management

    Directory of Open Access Journals (Sweden)

    Shirin Djalalinia

    2014-01-01

    Conclusions: We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  3. Effectiveness evaluation of the R&D projects in organizations financed by the budget expenses

    Science.gov (United States)

    Yakovlev, D.; Yushkov, E.; Pryakhin, A.; Bogatyreova, M.

    2017-01-01

    The issues of R&D project performance and their prospects are closely concerned with knowledge management. In the initial stages of the project development, it is the quality of the project evaluation that is crucial for the result and generation of future knowledge. Currently there does not exist any common methodology for the evaluation of new R&D financed by the budget. Suffice it to say, the assessment of scientific and technical projects (ST projects) varies greatly depending on the type of customer - government or business structures. An extensive methodological groundwork was formed with respect to orders placed by business structures. It included “an internal administrative order” by the company management for the results of STA intended for its own ST divisions. Regretfully this is not the case with state orders in the field of STA although the issue requires state regulation and official methodological support. The article is devoted to methodological assessment of scientific and technical effectiveness of studies performed at the expense of budget funds, and suggests a new concept based on the definition of the cost-effectiveness index. Thus, the study reveals it necessary to extend the previous approach to projects of different levels - micro-, meso-, macro projects. The preliminary results of the research show that there must be a common methodological approach to underpin the financing of projects under government contracts within the framework of budget financing and stock financing. This should be developed as general guidelines as well as recommendations that reflect specific sectors of the public sector, various project levels and forms of financing, as well as different stages of project life cycle.

  4. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    Science.gov (United States)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  5. Evaluation of a Team Project Based Learning Module for Developing Employability Skills

    OpenAIRE

    Janice Whatley

    2012-01-01

    This paper presents a case study, in which a new module, aimed at enhancing students’ employ-ability skills, is evaluated. Employability skills for graduates from higher education are regarded as essential outcomes from their degree programmes, but it can be difficult to provide appropriate opportunities to develop these skills in the context of their studies. This paper describes a new module, called Live Projects, designed to provide project based learning on campus, but involv-ing local bu...

  6. Usefulness of time-resolved projection MRA on evaluation of hemodynamics in cerebral occlusive diseases

    International Nuclear Information System (INIS)

    Oka, Yoshihisa; Kusunoki, Katsusuke; Nochide, Ichiro; Igase, Keiji; Harada, Hironobu; Sadamoto, Kazuhiko; Nagasawa, Kiyoshi

    2001-01-01

    The usefulness for evaluation of cerebral hemodynamics using time-resolved projection MRA was studied in normal volunteers and patients of cerebrovascular diseases. Six normal volunteers and ten patients with cerebrovascular occlusive diseases including 6 of IC occlusion and 4 of post EC/IC bypass surgery underwent time-resolved projection MRA on a 1.5 T clinical MRI system. Projection angiograms are acquired with 2D-fast SPGR sequence with a time resolution of approximately one image per second, 40 images being acquired consecutively before and after bolus injection Gd-DTPA. And all images were calculated by complex subtraction from the background mask in a work station. In normal volunteers, the quality of images of time-resolved projection MRA was satisfactory. The arteries from internal carotid artery through M2 segment of middle cerebral artery and all major venous systems were well portrayed. In 4 cases of IC occlusion who were assessed the collateral flow through the anterior communicating artery and posterior communicating artery, there were delayed to demonstrate the ipsilateral MCA. However, in 2 cases of IC occlusion that were assessed the collateral flow through leptomeningeal anastomosis, ipsilateral MCA and collateral circulation were not demonstrated. In all patients of post EC/IC bypass surgery, the patency of EC/IC bypass could be evaluated as properly with time-resolved projection MRA as 3D-TOF MRA. Although the temporal and spatial resolutions are insufficient, time-resolved projection MRA was power-full non-invasive method to evaluate the cerebral hemodynamics vis the basal communicating arteries in IC occlusion and identify the patency of EC/IC bypass. (author)

  7. Manual for research, development and technology program and project evaluations : final report.

    Science.gov (United States)

    2016-04-01

    This manual provides the Federal Railroad Administrations (FRA) Office of Research, Development and Technology (RD&T) a : framework, standards, and procedures for planning, conducting, reporting, and using sound evaluations of RD&Ts projects fo...

  8. PROJECT OF THE TRANS-SIBERIAN RAILWAY RECONSTRUCTION AS AN OBJECT OF SOCIAL EFFICIENCY EVALUATION

    Directory of Open Access Journals (Sweden)

    Kibalov E. B.

    2015-06-01

    Full Text Available We consider the problem of social efficiency evaluation concerning the project of the Trans-Siberian Railway reconstruction. This project is to be realized in the situation of strategic (fundamental uncertainty. Existing tools are not sufficient for solving this problem (because of qualitatively different nature of the project as compared with those abroad, much higher degree of uncertainty, and the lack of estimates for a number of necessary norms. Our study aims at development of an approach that would be adequate to the problem under consideration. We developed a two-level model for investment decision-making for appraisal and selection of a variant of the large-scale project. The upper level of this model bases on the macroeconomic approach (with the use of a specialized version of the Inter-Sector Inter-Region Optimization Model; the lower level bases on the microeconomic approach. As opposed to the foreign practice, the efficiency evaluation and selection of a variant of the transport project is top-down. End-to-end taking uncertainty into account is implemented. A tool for this is the scenario approach on the upper level, and the fuzzy set theory at the lower one.

  9. Project W-314 specific test and evaluation plan for 241-AN-A valve pit

    International Nuclear Information System (INIS)

    Hays, W.H.

    1997-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation

  10. Guia para la Elaboracion y Evaluacion de Proyectos de Investigacion (Guidelines for Reporting and Evaluating Research Projects).

    Science.gov (United States)

    Morles, Victor

    This article establishes guidelines for conducting and evaluating research projects according to a scientific methodology. The organizational format suggested here follows an outline with elements and details that should be considered in an investigation. Each part of the proposed outline is explained, and terms are defined. Project evaluation is…

  11. Chinese Opportunities in Career Education (Project CHOICE). 1990-91 Final Evaluation Profile. OREA Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Chinese Opportunities in Career Education Program (Project CHOICE), which served economically disadvantaged Chinese American high school students of limited English proficiency. The project operated at two Manhattan high schools and served 523 students, of whom 94.6 percent were eligible for…

  12. Evaluation of Pacific Islands Early Childhood Caries Prevention Project: Republic of the Marshall Islands.

    Science.gov (United States)

    Milgrom, Peter; Tut, Ohnmar K

    2009-01-01

    This communication reports an outcomes evaluation of the Pacific Islands Early Childhood Caries Prevention Project. The evaluation includes children in three conditions: a) topical fluoride varnish three times per school year; b) varnish plus twice-per-day toothbrushing; and c) intervention 2 plus three-times-per-day xylitol containing gummy bear snacks at school and home visits to encourage parental involvement. For this evaluation, groups 2 and 3 have been combined. One year after project implementation, mean decayed, extracted, or filled primary teeth was 10.3 [standard deviation (SD)= 4.3] teeth for group 1, and 8.2 (SD = 4.0) teeth for the combination of groups 2 and 3 (P 0.05). Evaluation confirms the outcome of a program including both in-school twice-daily toothbrushing with fluoridated toothpaste and frequent applications of fluoride varnish.

  13. Evaluation of Fatih Project in the Frame of Digital Divide

    Science.gov (United States)

    Karabacak, Kerim

    2016-01-01

    The aim of this research realized at the general survey model is to evaluate "FATIH Project" in the frame of digital divide by determining the effects of the distributed tablets to the students being educated at K-12 schools on digital divide. Sample is taking from the 9th grade students in Sakarya city in the 2013-2014 academic session.…

  14. Evaluation of Romblon State University’s Adopt-a-Reviewee Project for Certified Public Accountant Licensure Examination

    Directory of Open Access Journals (Sweden)

    Sherryll M. Fetalvero

    2018-02-01

    Full Text Available This study is part of a bigger evaluation research about the Adopt-a-Reviewee Project for Certified Public Accountant Licensure Examination (ADOPT of the College of Business and Accountancy of Romblon State University. The project was assessed using Stufflebeam’s Context, Input, Process and Product (CIPP evaluation model. This paper however, focuses only on CIPP’s product evaluation component which is essential in making decisions as to the continuation or abortion of the project. A mixed method research was employed in gathering information from 16 beneficiaries and their respective families using two parallel forms of validated evaluation questionnaire complemented with interviews. These data were triangulated in a focus group composed of beneficiaries, benefactors, administrative officials, college dean and accounting teachers. To determine the effect of ADOPT on RSU’s passing performance in the CPA Licensure Examination (CPALE, a series of comparative tests was done. Results reveal that ADOPT is an effective intervention in improving RSU’s performance in CPALE as well as the socio- economic condition and well-being of the beneficiaries and their families. Workable measures are advanced in order to sustain the project despite challenges in fund sourcing and generation.

  15. The Effect of Technical Assistance on Involvement and Use: The Case of a Research, Evaluation, and Technical Assistance Project

    Science.gov (United States)

    Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine

    2011-01-01

    In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…

  16. William H. Taft High School Project HOLA 1983-1984. O.E.A. Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY. Office of Educational Evaluation.

    This report evaluates Project HOLA, in its first year of funding, which provides instruction in English as a second language, Spanish language skills, and bilingual instruction in mathematics, science, and social studies to approximately 230 students in a high school in Bronx, New York. The report examines the project's long- and short-range…

  17. A synthesis of evaluation monitoring projects by the forest health monitoring program (1998-2007)

    Science.gov (United States)

    William A. Bechtold; Michael J. Bohne; Barbara L. Conkling; Dana L. Friedman

    2012-01-01

    The national Forest Health Monitoring Program of the Forest Service, U.S. Department of Agriculture, has funded over 200 Evaluation Monitoring projects. Evaluation Monitoring is designed to verify and define the extent of deterioration in forest ecosystems where potential problems have been identified. This report is a synthesis of results from over 150 Evaluation...

  18. Data analysis and management for the Uranium Resource Evaluation Project

    International Nuclear Information System (INIS)

    Kane, V.E.

    1980-01-01

    The Department of Energy has funded a large data collection effort with the purpose of determining the US uranium resources. This Uranium Resource Evaluation (URE) Project required a large data management effort which involved collection, retrieval, processing, display, and analysis of large volumes of data. Many of the characteristics of this data processing system are relevant to other applications, particularly where routine processing involves analyses for input into numerous technical reports. The URE Project computing system has a modular program structure which has enabled a straightforward interface with both special and general graphics and analysis packages such as SAS, BMDP, and SURFACE II. Other topics include cost-effective computing, data quality, report quality computer output, and test versus production program development

  19. Evaluation of data requirements for computerized constructability analysis of pavement rehabilitation projects.

    Science.gov (United States)

    2013-08-01

    This research aimed to evaluate the data requirements for computer assisted construction planning : and staging methods that can be implemented in pavement rehabilitation projects in the state of : Georgia. Results showed that two main issues for the...

  20. EVALUATION OF EFFICIENCY OF FINANCING TRANSPORT INFRASTRUCTURE PROJECTS REALIZED IN THE FRAMEWORK OF PUBLIC PRIVATE PARTNERSHIP

    Directory of Open Access Journals (Sweden)

    S. B. Vasiliev

    2015-01-01

    Full Text Available The article examines the basic approach to evaluating efficiency of financing transport infrastructure projects realized in the framework of public private partnership. The main ways of the project realization are identified, and their main advantages and disadvantages are described. Detailed elaboration and structuring of infrastructure projects are grounded.

  1. The Climate Impacts Research Consortium: Lessons Learned from the Evaluation of Co-production projects

    Science.gov (United States)

    Sokolovska, I.; Andrepont, J. A.; Lach, D.

    2017-12-01

    The Pacific Northwest Climate Impacts Research Consortium (CIRC) is a climate-science-to-climate-action team funded by the National Oceanic and Atmospheric Administration (NOAA), member of NOAA's Regional Integrated Sciences and Assessments (RISA) program. The internal evaluation of the last 6 years of CIRC's work focused on the co-production of knowledge process. The evaluation was based on CIRC's Reflection and Logic model and used a mixed methods design. During regular monthly meetings in 2014/15, all CIRC PIs reflected on the co-production process and presented their evaluation of the projects they worked on. Additionally, we conducted semi-structured interviews with CIRC participants, purposefully targeting key informants. The Climate Impacts Research Consortium teams also administered surveys to assess participants' experiences of the coproduction process as they were engaging in it. Identifying and cultivating an informant from the local stakeholder group with deep, accessible roots within the target community can lead to better coproduction results than having to build those relationships from naught. Across projects, most participants agreed that the project increased their understanding of their area's hazards and by the end of the project most participants were confident the project would produce useful results for themselves. Finally, most participants intended to share what they had learned from this experience with their colleagues and we found that co-production built capacities necessary for communities to incorporate climate change in discussions even after the end of CIRC's participation. During the projects, the involvement of non-traditional participants along with experts was critical to success and a lot of work and preparation needs to be put into the planning of any co-production meeting to overcome various barriers to communication and build trust.

  2. The Childhood Obesity Declines Project: Implications for Research and Evaluation Approaches.

    Science.gov (United States)

    Young-Hyman, Deborah; Morris, Kathryn; Kettel Khan, Laura; Dawkins-Lyn, Nicola; Dooyema, Carrie; Harris, Carole; Jernigan, Jan; Ottley, Phyllis; Kauh, Tina

    2018-03-01

    Childhood obesity remains prevalent and is increasing in some disadvantaged populations. Numerous research, policy and community initiatives are undertaken to impact this pandemic. Understudied are natural experiments. The need to learn from these efforts is paramount. Resulting evidence may not be readily available to inform future research, community initiatives, and policy development/implementation. We discuss the implications of using an adaptation of the Systematic Screening and Assessment (SSA) method to evaluate the Childhood Obesity Declines (COBD) project. The project examined successful initiatives, programs and policies in four diverse communities which were concurrent with significant declines in child obesity. In the context of other research designs and evaluation schemas, rationale for use of SSA is presented. Evidence generated by this method is highlighted and guidance suggested for evaluation of future studies of community-based childhood obesity prevention initiatives. Support for the role of stakeholder collaboratives, in particular the National Collaborative on Childhood Obesity Research, as a synergistic vehicle to accelerate research on childhood obesity is discussed. SSA mapped active processes and provided contextual understanding of multi-level/component simultaneous efforts to reduce rates of childhood obesity in community settings. Initiatives, programs and policies were not necessarily coordinated. And although direct attribution of intervention/initiative/policy components could not be made, the what, by who, how, to whom was temporally associated with statistically significant reductions in childhood obesity. SSA provides evidence for context and processes which are not often evaluated in other data analytic methods. SSA provides an additional tool to layer with other evaluation approaches.

  3. The challenges of evaluating and comparing projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Hedegaard, Flemming

    2016-01-01

    Project Half Double is an industry-driven initiative with the purpose to develop a new and radical project paradigm to increase the competitiveness of the Danish industry. The research part of Project Half Double will assess the degree to which the new project paradigm is more successful than...... organizations lack the project maturity to take advantage of the frameworks....

  4. New product development projects evaluation under time uncertainty

    Directory of Open Access Journals (Sweden)

    Thiago Augusto de Oliveira Silva

    2009-12-01

    Full Text Available The development time is one of the key factors that contribute to the new product development success. In spite of that, the impact of the time uncertainty on the development has been not fully exploited, as far as decision supporting models to evaluate this kind of projects is concerned. In this context, the objective of the present paper is to evaluate the development process of new technologies under time uncertainty. We introduce a model which captures this source of uncertainty and develop an algorithm to evaluate projects that incorporates Monte Carlo Simulation and Dynamic Programming. The novelty in our approach is to thoroughly blend the stochastic time with a formal approach to the problem, which preserves the Markov property. We base our model on the distinction between the decision epoch and the stochastic time. We discuss and illustrate the applicability of our model through an empirical example.O tempo de desenvolvimento é um dos fatores-chave que contribuem para o sucesso do desenvolvimento de novos produtos. Apesar disso, o impacto da incerteza de tempo no desenvolvimento tem sido pouco considerado em modelos de avaliação e valoração deste tipo de projetos. Neste contexto, este trabalho tem como objetivo avaliar projetos de desenvolvimento de novas tecnologias mediante o tempo incerto. Introduzimos um modelo capaz de captar esta fonte de incerteza e desenvolvemos um algoritmo para a valoração do projeto que integra Simulação de Monte Carlo e Programação Dinâmica. A novidade neste trabalho é conseguir integrar meticulosamente o tempo estocástico a uma estrutura formal para tomada de decisão que preserva a propriedade de Markov. O principal ponto para viabilizar este fato é distinção entre o momento de revisão e o tempo estocástico. Ilustramos e discutimos a aplicabilidade deste modelo por meio de um exemplo empírico.

  5. Evaluation of Projected Agricultural Climate Risk over the Contiguous US

    Science.gov (United States)

    Zhu, X.; Troy, T. J.; Devineni, N.

    2017-12-01

    Food demands are rising due to an increasing population with changing food preferences, which places pressure on agricultural production. Additionally, climate extremes have recently highlighted the vulnerability of our agricultural system to climate variability. This study seeks to fill two important gaps in current knowledge: how does the widespread response of irrigated crops differ from rainfed and how can we best account for uncertainty in yield responses. We developed a stochastic approach to evaluate climate risk quantitatively to better understand the historical impacts of climate change and estimate the future impacts it may bring about to agricultural system. Our model consists of Bayesian regression, distribution fitting, and Monte Carlo simulation to simulate rainfed and irrigated crop yields at the US county level. The model was fit using historical data for 1970-2010 and was then applied over different climate regions in the contiguous US using the CMIP5 climate projections. The relative importance of many major growing season climate indices, such as consecutive dry days without rainfall or heavy precipitation, was evaluated to determine what climate indices play a role in affecting future crop yields. The statistical modeling framework also evaluated the impact of irrigation by using county-level irrigated and rainfed yields separately. Furthermore, the projected years with negative yield anomalies were specifically evaluated in terms of magnitude, trend and potential climate drivers. This framework provides estimates of the agricultural climate risk for the 21st century that account for the full uncertainty of climate occurrences, range of crop response, and spatial correlation in climate. The results of this study can contribute to decision making about crop choice and water use in an uncertain future climate.

  6. Evaluation of helium impurity impacts on Spent Nuclear Fuel project processes (OCRWM)

    International Nuclear Information System (INIS)

    SHERRELL, D.L.

    1999-01-01

    This document identifies the types and quantities of impurities that may be present within helium that is introduced into multi-canister overpacks (MCO)s by various SNF Project facilities, including, but not limited to the Cold Vacuum Drying (CVD) Facility (CVDF). It then evaluates possible impacts of worst case impurity inventories on MCO drying, transportation, and storage processes. Based on the evaluation results, this document: (1) concludes that the SNF Project helium procurement specification can be a factor-of-ten less restrictive than a typical vendor's standard offering (99.96% pure versus the vendor's 99.997% pure standard offering); (2) concludes that the CVDF's current 99.5% purity requirement is adequate to control the quality of the helium that is delivered to the MCO by the plant's helium distribution system; and (3) recommends specific impurity limits for both of the above cases

  7. Area recommendation report for the crystalline repository project: An evaluation

    International Nuclear Information System (INIS)

    Beck, J.E.; Lowe, H.; Yurkovich, S.P.

    1986-01-01

    An evaluation is given of DOE's recommendation of the Elk River complex in North Carolina for siting the second repository. Twelve recommendations are made including a strong suggestion that the Cherokee Tribe appeal both through political and legal avenues for inclusion as an affected area primarily due to projected impacts upon economy and public health as a consequence of the potential for reduced tourism

  8. Internal evaluation of the European network for health technology assessment project.

    Science.gov (United States)

    Håheim, Lise Lund; Imaz, Iñaki; Loud, Marlène Läubli; Gasparetto, Teresa; González-Enriquez, Jesús; Dahlgren, Helena; Trofimovs, Igor; Berti, Elena; Mørland, Berit

    2009-12-01

    The internal evaluation studied the development of the European network for Health Technology Assessment (EUnetHTA) Project in achieving the general objective of establishing an effective and a sustainable network of health technology assessment (HTA) in Europe. The Work Package 3 group was dedicated to this task and performed the work. Information on activities during the project was collected from three sources. First, three yearly cross-sectional studies surveyed the participants' opinions. Responses were by individuals or by institutions. The last round included surveys to the Steering Committee, the Stakeholder Forum, and the Secretariat. Second, the Work Package Lead Partners were interviewed bi-annually, five times in total, to update the information on the Project's progress. Third, additional information was sought in available documents. The organizational structure remained stable. The Project succeeded in developing tools aimed at providing common methodology with intent to establish a standard of conducting and reporting HTA and to facilitate greater collaboration among agencies. The participants/agencies expressed their belief in a network and in maintaining local/national autonomy. The Work Package Leaders expressed a strong belief in the solid base of the Project for a future network on which to build, but were aware of the need for funding and governmental support. Participants and Work Package Leaders have expressed support for a future network that will improve national and international collaboration in HTA based on the experience from the EUnetHTA project.

  9. Design, Implementation, and Evaluation of the Adolescents and Surveillance System for the Obesity Prevention Project.

    Science.gov (United States)

    Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina

    2016-03-01

    The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.

  10. Bidding cost evaluation with fuzzy methods on building project in Jakarta

    Science.gov (United States)

    Susetyo, Budi; Utami, Tin Budi

    2017-11-01

    National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.

  11. External Economies Evaluation of Wind Power Engineering Project Based on Analytic Hierarchy Process and Matter-Element Extension Model

    Directory of Open Access Journals (Sweden)

    Hong-ze Li

    2013-01-01

    Full Text Available The external economies of wind power engineering project may affect the operational efficiency of wind power enterprises and sustainable development of wind power industry. In order to ensure that the wind power engineering project is constructed and developed in a scientific manner, a reasonable external economies evaluation needs to be performed. Considering the interaction relationship of the evaluation indices and the ambiguity and uncertainty inherent, a hybrid model of external economies evaluation designed to be applied to wind power engineering project was put forward based on the analytic hierarchy process (AHP and matter-element extension model in this paper. The AHP was used to determine the weights of indices, and the matter-element extension model was used to deduce final ranking. Taking a wind power engineering project in Inner Mongolia city as an example, the external economies evaluation is performed by employing this hybrid model. The result shows that the external economies of this wind power engineering project are belonged to the “strongest” level, and “the degree of increasing region GDP,” “the degree of reducing pollution gas emissions,” and “the degree of energy conservation” are the sensitive indices.

  12. Evaluation of helium impurity impacts on Spent Nuclear Fuel project processes (OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    SHERRELL, D.L.

    1999-09-21

    This document identifies the types and quantities of impurities that may be present within helium that is introduced into multi-canister overpacks (MCO)s by various SNF Project facilities, including, but not limited to the Cold Vacuum Drying (CVD) Facility (CVDF). It then evaluates possible impacts of worst case impurity inventories on MCO drying, transportation, and storage processes. Based on the evaluation results, this document: (1) concludes that the SNF Project helium procurement specification can be a factor-of-ten less restrictive than a typical vendor's standard offering (99.96% pure versus the vendor's 99.997% pure standard offering); (2) concludes that the CVDF's current 99.5% purity requirement is adequate to control the quality of the helium that is delivered to the MCO by the plant's helium distribution system; and (3) recommends specific impurity limits for both of the above cases.

  13. Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Shahid Hussain

    2018-05-01

    Full Text Available The quality of the constructed social infrastructure project has been considered a necessary measure for the sustainability of projects. Studies on factors affecting project quality have used various techniques and methods to explain the relationships between particular variables. Unexpectedly, Structural Equation Modeling (SEM has acquired very little concern in factors affecting project quality studies. To address this limitation in the body of knowledge, the objective of this study was to apply the SEM approach and build a model that explained and identified the critical factors affecting quality in social infrastructure projects. The authors developed a quantitative approach using smart-PLS version 3.2.7. This study shed light on the views of different experts based on their experience in public construction projects in Pakistan. Particularly, the authors aimed to find out the relationships between construction, stakeholders, materials, design, and external factors, and how these relate to project quality. The findings of this study revealed that the R2 value of the model was scored at 0.749, which meant that the five exogenous latent constructs collectively explained 74.9% of the variance in project quality. The Goodness-of-Fit of the model was 0.458. The construction related factor was the most important out of the five constructs. This study determined that better planning and monitoring and evaluation should be developed to better address and control the quality defects by decision-makers, project managers as well as contractors. These findings might support practitioners and decision makers to focus on quality related problems that might occur in their current or future projects.

  14. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  15. Application of an integrated model for evaluation and optimization of business projects portfolios

    Directory of Open Access Journals (Sweden)

    Camila Costa Dutra

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio.

  16. APPLICATION OF AN INTEGRATED MODEL FOR EVALUATION AND OPTIMIZATION OF BUSINESS PROJECTS PORTFOLIOS

    Directory of Open Access Journals (Sweden)

    Maria Auxiliadora Cannarozzo Tinoco

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio

  17. Evaluation of different Project Based Learning designs in an MSc degree

    Directory of Open Access Journals (Sweden)

    Carmen García Berdonés

    2014-03-01

    Full Text Available The design and implementation of different Project Based Learning (PBL approaches are presented in this paper. All of them were carried out in the framework of the MSc degree in Electronic Systems for Smart Environments from the University of Malaga. Four subjects were developed using different values of the three main parameters of PBL: teamwork, self-guided learning and project complexity. During two academic years, several indicators were used to evaluate these experiences: compliance with subject time schedules, scores obtained for the students, interaction of each student in his team and satisfaction of students with the experiences. Our results encourage the use of PBL in bachelor degrees but, at the same time, confirm that PBL implementation is not a trivial task when projects are complex or when a high level of autonomous learning is required from students. Teamwork difficulties have also been found. So, we discuss the need of reaching a minimum level of proficiency in some key competencies before using PBL.

  18. THE PRACTICE OF EVALUATING THE ECONOMIC EFFICIENCY OF THE INNOVATIVE PROJECT

    Directory of Open Access Journals (Sweden)

    I. A. Vorobiev

    2013-01-01

    Full Text Available At the present stage of development of the society of scientific and technical activities is the most important factor in the intensification of production and the growth of its economic performance. It is therefore important now gets to determine the effectiveness of research and development activities, improving the measurement methods of economic evaluation of innovative projects and innovation. For informed decision-making requires a deep study and objective assessment of the real situation. This is due to changes in economic relations between the producers and consumers of scientific and technical products. Earlier in this activity involved only state scientific institution and the enterprise, then now they are gradually joining financial institutions, commercial and non-profit organizations. The adoption of innovative solutions should be preceded by thorough and comprehensive analysis of the economic feasibility of the innovative project. In this paper we propose to consider how business is costing innovative projects and determine their effectiveness for the enterprise business hotel.

  19. UPS CNG Truck Fleet Start Up Experience: Alternative Fuel Truck Evaluation Project

    International Nuclear Information System (INIS)

    Walkowicz, K.

    2001-01-01

    UPS operates 140 Freightliner Custom Chassis compressed natural gas (CNG)-powered vehicles with Cummins B5.9G engines. Fifteen are participating in the Alternative Fuel Truck Evaluation Project being funded by DOE's Office of Transportation Technologies and the Office of Heavy Vehicle Technologies

  20. Methodology and evaluation of priorities for energy and environmental research projects

    International Nuclear Information System (INIS)

    Kagazyo, T.; Kaneko, K.; Akai, M.

    1997-01-01

    To evaluate and prioritize energy-related projects, not only technological issues but also resource and social aspects must be included. We use an analytic hierarchy process (AHP) for incorporating these two features. Technological issues are divided into three categories; resource and social aspects are divided into five categories. Each category is further subdivided, forming a tree-like hierarchy. Nineteen energy-related characteristics and seven environmental characteristics are used to describe a proposed research project. By utilizing the estimated relative importance of each selected characteristic, seven different planning perspectives have been identified: short-, intermediate-, and long-range strategies for Japan, short- and intermediate-range strategies for less developed countries (LDCs), and intermediate- and long-range global strategies. (author)

  1. Interim Evaluation of the Project P.A.T.H.S.: Findings Based on Different Datasets

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2012-01-01

    Full Text Available Interim evaluation studies were carried out in order to examine the implementation details of the Tier 1 Program of the Project P.A.T.H.S. (Positive Adolescent Training through Holistic Social Programmes in Hong Kong. Quantitative results of the interim evaluation findings based on eight datasets collected from 2006 to 2009 are reported in this paper. Three hundred and seventy-eight schools were randomly selected to provide information on the implementation details of the program via face-to-face interviews, telephone interviews, and self-completed questionnaires. Results showed that a majority of the workers perceived that the students had positive responses to the program and the program was helpful to the students. In conjunction with other process evaluation findings, the present study suggests that the implementation quality of the Tier 1 Program of the Project P.A.T.H.S. is high. The present study also provides support for the effectiveness of the Tier 1 Program of the Project P.A.T.H.S. in Hong Kong.

  2. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Lower Columbia River and Estuary, 2009

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Diefenderfer, Heida L.; Borde, Amy B.; Bryson, Amanda J.; Cameron, April; Coleman, Andre M.; Corbett, C.; Dawley, Earl M.; Ebberts, Blaine D.; Kauffman, Ronald; Roegner, G. Curtis; Russell, Micah T.; Silva, April; Skalski, John R.; Thom, Ronald M.; Vavrinec, John; Woodruff, Dana L.; Zimmerman, Shon A.

    2010-10-26

    This is the sixth annual report of a seven-year project (2004 through 2010) to evaluate the cumulative effects of habitat restoration actions in the lower Columbia River and estuary (LCRE). The project, called the Cumulative Effects Study, is being conducted for the U.S. Army Corps of Engineers Portland District (USACE) by the Marine Sciences Laboratory of the Pacific Northwest National Laboratory (PNNL), the Pt. Adams Biological Field Station of the National Marine Fisheries Service (NMFS), the Columbia River Estuary Study Taskforce (CREST), and the University of Washington. The goal of the Cumulative Effects Study is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the 235-km-long LCRE. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. From 2005 through 2009, annual field research involved intensive, comparative studies paired by habitat type (tidal swamp versus marsh), trajectory (restoration versus reference site), and restoration action (tidegate replacement vs. culvert replacement vs. dike breach).

  3. Development of the evaluation instrument use CIPP on the implementation of project assessment topic optik

    Science.gov (United States)

    Asfaroh, Jati Aurum; Rosana, Dadan; Supahar

    2017-08-01

    This research aims to develop an evaluation instrument models CIPP valid and reliable as well as determine the feasibility and practicality of an evaluation instrument models CIPP. An evaluation instrument models CIPP to evaluate the implementation of the project assessment topic optik to measure problem-solving skills of junior high school class VIII in the Yogyakarta region. This research is a model of development that uses 4-D. Subject of product trials are students in class VIII SMP N 1 Galur and SMP N 1 Sleman. Data collection techniques in this research using non-test techniques include interviews, questionnaires and observations. Validity in this research was analyzed using V'Aikens. Reliability analyzed using ICC. This research uses 7 raters are derived from two lecturers expert (expert judgment), two practitioners (science teacher) and three colleagues. The results of this research is the evaluation's instrument model of CIPP is used to evaluate the implementation of the implementation of the project assessment instruments. The validity result of evaluation instrument have V'Aikens values between 0.86 to 1, which means a valid and 0.836 reliability values into categories so well that it has been worth used as an evaluation instrument.

  4. Evaluation plan for a cardiological multi-media workstation (I4C project)

    NARCIS (Netherlands)

    Hofstede, J.W. van der; Quak, A.B.; Ginneken, A.M. van; Macfarlane, P.W.; Watson, J.; Hendriks, P.R.; Zeelenberg, C.

    1997-01-01

    The goal of the I4C project (Integration and Communication for the Continuity of Cardiac Care) is to build a multi-media workstation for cardiac care and to assess its impact in the clinical setting. This paper describes the technical evaluation plan for the prototype.

  5. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  6. Project desk evaluation of a model project CPR/5/009 industrial scale irradiation of rice and other foodstuffs

    International Nuclear Information System (INIS)

    1996-11-01

    The project CPR/5/009 was approved in 1993 as a model project. The project objective was to build an industrial food irradiation facility for high quality rice and other foodstuffs, with a processing capacity of 5000-9000 tonnes per year. This capacity is large compared to many other facilities of the same type elsewhere. The success of the project waste to be measured against the full utilization of the facility with an acceptable availability factor. Disbursements on Agency inputs up to the end of June 1996 were $294,716 and consisted of one 100 kCi Co-60 source, quality control equipment, bag heat sealers, one expert mission and 13.5 months of training abroad. The current budget is $323,870, following two programme changes. The total cost of the project was estimated at $1,331,300 with the Chinese Government providing the balance. The major conclusions of this evaluation are as follows: Initially, the Agency overestimated the project and business management experience of the counterpart, and consequently underestimated the extent of support required. Providing support to counterparts in facing the key challenges of project management and business operation must be considered by the Agency in future projects of this type. The counterpart institution is also encouraged to emphasize these management issues in order to maximize sustainable and cost-effective utilization of such facilities. A new operational plan has been prepared by the counterpart for 1996 through 1998 which identifies seven customers requiring treatment of a total of 1000 tonnes per year of cereal grains and 1500 tonnes per year of other foodstuffs. This plan reflects a change in overall emphasis from supporting food supply security to ensuring the safety of foodstuffs. It is not clear whether this plan will support operation of the facility at full capacity. The team in place to operate the facility also needs further strengthening. (author). Figs, tabs

  7. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  8. To widen the action tools against the climatic change by domestic projects. Evaluation report

    International Nuclear Information System (INIS)

    Arnaud, E.; Dominicis, A. de; Leguet, B.; Leseur, A.; Perthuis, Ch. de

    2005-11-01

    In the framework of the climatic change fight, each country aims to implement tools of emissions reduction. In France, the european system of CO 2 quotas exchange, applied on the more emitted installations, covers less than 30% of the national carbon emissions. The other 70% are free of taxes. The 'climate mission' realized an evaluation of the emission reduction in the case of a new policy aiming to develop domestic projects of emission control. This report presents the study and its conclusions: the domestic projects, the possibilities of these projects in the transportation agriculture and forests and building sectors, the implementing conditions

  9. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    International Nuclear Information System (INIS)

    Andersson, J.

    1993-01-01

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reason for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments

  10. Measuring societal effects of transdisciplinary research projects: design and application of an evaluation method.

    Science.gov (United States)

    Walter, Alexander I; Helgenberger, Sebastian; Wiek, Arnim; Scholz, Roland W

    2007-11-01

    Most Transdisciplinary Research (TdR) projects combine scientific research with the building of decision making capacity for the involved stakeholders. These projects usually deal with complex, societally relevant, real-world problems. This paper focuses on TdR projects, which integrate the knowledge of researchers and stakeholders in a collaborative transdisciplinary process through structured methods of mutual learning. Previous research on the evaluation of TdR has insufficiently explored the intended effects of transdisciplinary processes on the real world (societal effects). We developed an evaluation framework for assessing the societal effects of transdisciplinary processes. Outputs (measured as procedural and product-related involvement of the stakeholders), impacts (intermediate effects connecting outputs and outcomes) and outcomes (enhanced decision making capacity) are distinguished as three types of societal effects. Our model links outputs and outcomes of transdisciplinary processes via the impacts using a mediating variables approach. We applied this model in an ex post evaluation of a transdisciplinary process. 84 out of 188 agents participated in a survey. The results show significant mediation effects of the two impacts "network building" and "transformation knowledge". These results indicate an influence of a transdisciplinary process on the decision making capacity of stakeholders, especially through social network building and the generation of knowledge relevant for action.

  11. Evaluation of an institutional project to improve venous thromboembolism prevention.

    Science.gov (United States)

    Minami, Christina A; Yang, Anthony D; Ju, Mila; Culver, Eckford; Seifert, Kathryn; Kreutzer, Lindsey; Halverson, Terri; O'Leary, Kevin J; Bilimoria, Karl Y

    2016-12-01

    Northwestern Memorial Hospital (NMH) was historically a poor performer on the venous thromboembolism (VTE) outcome measure. As this measure has been shown to be flawed by surveillance bias, NMH embraced process-of-care measures to ensure appropriate VTE prophylaxis to assess healthcare-associated VTE prevention efforts. To evaluate the impact of an institution-wide project aimed at improving hospital performance on VTE prophylaxis measures. A retrospective observational study. NMH, an 885-bed academic medical center in Chicago, Illinois PATIENTS: Inpatients admitted to NMH from January 1, 2013 to May 1, 2013 and from October 1, 2014 to April 1, 2015 were eligible for evaluation. Using the define-measure-analyze-improve-control (DMAIC) process-improvement methodology, a multidisciplinary team implemented and iteratively improved 15 data-driven interventions in 4 broad areas: (1) electronic medical record (EMR) alerts, (2) education initiatives, (3) new EMR order sets, and (4) other EMR changes. The Joint Commission's 6 core measures and the Surgical Care Improvement Project (SCIP) SCIP-VTE-2 measure. Based on 3103 observations (1679 from January 1, 2013 to May 1, 2013, and 1424 from October 1, 2014 to April 1, 2015), performance on the core measures improved. Performance on measure 1 (chemoprophylaxis) improved from 82.5% to 90.2% on medicine services, and from 94.4% to 97.6% on surgical services. The largest improvements were seen in measure 4 (platelet monitoring), with a performance increase from 76.7% adherence to 100%, and measure 5 (warfarin discharge instructions), with a performance increase from 27.4% to 88.8%. A systematic hospital-wide DMAIC project improved VTE prophylaxis measure performance. Sustained performance has been observed, and novel control mechanisms for continued performance surveillance have been embedded in the hospital system. Journal of Hospital Medicine 2016;11:S29-S37. © 2016 Society of Hospital Medicine. © 2016 Society of Hospital

  12. Project Plan for the evaluation of REDC waste for TRU-waste radionuclides

    International Nuclear Information System (INIS)

    Nguyen, L.; Yong, L.; Chapman, J.

    1996-09-01

    This project plan describes the plan to determine whether the solid radioactive wastes generated by the Radiochemical Engineering Development Center (REDC) meet the Department of Energy's definition of transuranic wastes. Existing waste characterization methods will be evaluated, as well as historical data, and recommendations will be made as necessary

  13. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  14. Evaluation of the Frequency for Gas Sampling for the High Burnup Confirmatory Data Project

    Energy Technology Data Exchange (ETDEWEB)

    Stockman, Christine T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Alsaed, Halim A. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Bryan, Charles R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Marschman, Steven C. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Scaglione, John M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-05-01

    This report provides a technically based gas sampling frequency strategy for the High Burnup (HBU) Confirmatory Data Project. The evaluation of: 1) the types and magnitudes of gases that could be present in the project cask and, 2) the degradation mechanisms that could change gas compositions culminates in an adaptive gas sampling frequency strategy. This adaptive strategy is compared against the sampling frequency that has been developed based on operational considerations.

  15. Two-stage commercial evaluation of engineering systems production projects for high-rise buildings

    Science.gov (United States)

    Bril, Aleksander; Kalinina, Olga; Levina, Anastasia

    2018-03-01

    The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.

  16. Two-stage commercial evaluation of engineering systems production projects for high-rise buildings

    Directory of Open Access Journals (Sweden)

    Bril Aleksander

    2018-01-01

    Full Text Available The paper is devoted to the current and debatable problem of methodology of choosing the effective innovative enterprises for venture financing. A two-stage system of commercial innovation evaluation based on the UNIDO methodology is proposed. Engineering systems account for 25 to 40% of the cost of high-rise residential buildings. This proportion increases with the use of new construction technologies. Analysis of the construction market in Russia showed that the production of internal engineering systems elements based on innovative technologies has a growth trend. The production of simple elements is organized in small enterprises on the basis of new technologies. The most attractive for development is the use of venture financing of small innovative business. To improve the efficiency of these operations, the paper proposes a methodology for a two-stage evaluation of small business development projects. A two-stage system of commercial evaluation of innovative projects allows creating an information base for informed and coordinated decision-making on venture financing of enterprises that produce engineering systems elements for the construction business.

  17. CRITICAL RADAR: TOOL AND METHODOLOGY FOR EVALUATING CURRENT PROJECTS USING MULTIPLE VARIABLES

    Directory of Open Access Journals (Sweden)

    André M. Ferrari

    2017-06-01

    Full Text Available Many resources are invested in measurement processes of projects indicators without, however, give a clear view of which projects deserves the right attention at the right time. This paper proposes the use of statistics, through the analysis of multiple variables and their interrelationships, to give better basis to a critical assessment methodology of current projects used in a multinational mining company. The contribution of the research is to report the methodology called Critical Radar which is based on a graphical tool with simple operationalization that can support the decision making in complex environments, and has great flexibility across the different market scenarios and possible changes in companies guidelines. The tool has great potential to help evaluate current projects due to their characteristics of flexible use in different business areas; high degree of freedom for improvement; use of known market tool in its development; ease of viewing the results through charts and notes and user freedom to use any existing indicators in the company if complied with some statistical data quality characteristics.

  18. Isotopes Project

    International Nuclear Information System (INIS)

    Dairiki, J.M.; Browne, E.; Firestone, R.B.; Lederer, C.M.; Shirley, V.S.

    1984-01-01

    The Isotopes Project compiles and evaluates nuclear structure and decay data and disseminates these data to the scientific community. From 1940-1978 the Project had as its main objective the production of the Table of Isotopes. Since publication of the seventh (and last) edition in 1978, the group now coordinates its nuclear data evaluation efforts with those of other data centers via national and international nuclear data networks. The group is currently responsible for the evaluation of mass chains A = 167-194. All evaluated data are entered into the International Evaluated Nuclear Structure Data File (ENSDF) and are published in Nuclear Data Sheets. In addition to the evaluation effort, the Isotopes Project is responsible for production of the Radioactivity Handbook

  19. Comprehensive evaluation of environmental and economic benefits of China's urban underground transportation construction projects.

    Science.gov (United States)

    Yang, Xiaobin; Chen, Zhilong; Guo, Dongjun

    2015-07-01

    Urban underground transportation projects are introduced to address problems of scarce green land and traffic pollution. As construction of urban underground transportation is still in its infancy, there is no definite quantitative measurement on whether the construction is beneficial and what influences it will place on the region in China. This study intends to construct a comprehensive evaluation method for evaluating social, economic and environmental benefits of urban underground transportation projects and proposes the concept, role and principle for evaluation of environmental and economic benefits. It figures out relationship between the environment and factors of city development. It also summarizes three relevant factors, including transportation, biophysics and social economy, and works out indicators to evaluate the influence of urban underground transportation construction. Based on Contingent Valuation Method (CVM), Cost of Illness Approach (CIA), Human Capital Approach (HCA), this paper constructs 13 monetization calculation models for social, economic and environmental benefits in response to seven aspects, namely, reducing noise pollution and air pollution, using land efficiently, improving traffic safety, reducing traffic congestion, saving shipping time and minimizing transportation costs.

  20. Measurement, calculation and evaluation of photon production data. Final report of a coordinated research project

    International Nuclear Information System (INIS)

    Oblozinsky, P.; Dietrich, F.S.; Mengoni, A.

    1999-12-01

    The report summarizes results of the Coordinated Research Project (CRP) devoted to photon preduction in neutron-induced reactions. The report presents 25 original contributions that reflect accomplishments achieved in measurement, calculation and evaluation of photon production under the project in 1994-1997. Major results are highlighted and a list of the CRP publications is given. (author)

  1. A method for evaluating the funding of components of natural resource and conservation projects

    International Nuclear Information System (INIS)

    Wellington, John F.; Lewis, Stephen A.

    2016-01-01

    Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to and enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided

  2. Production of NDA Working Reference Materials for the Capability Evaluation Project

    International Nuclear Information System (INIS)

    Noll, P.D. Jr.; Marshall, R.S.

    1998-01-01

    The production of Non Destructive Assay (NDA) Working Reference Materials (WRMs) that are traceable to nationally recognized standards was undertaken to support implementation of the Idaho National Engineering and Environmental Laboratory (INEEL) Nondestructive Waste Assay Capability Evaluation Project (CEP). The WRMs produced for the CEP project consist of Increased Am/Pu mass ration (IAP) and depleted Uranium (DU) WRMs. The CEP IAP/DU WRM set provides radioactive material standards for use in combination with 55 gallon drum waste matrix surrogates for the assessment of waste NDA assay system performance. The Production of WRMs is a meticulous process that is not without certain trials and tribulations. Problems may arise at any of the various stages of WRM production which include, but are not limited to; material characterization (physical, chemical, and isotopic), material blend parameters, personnel radiation exposure, gas generation phenomenon, traceability to national standards, encapsulation, statistical evaluation of the data, and others. Presented here is an overall description of the process by which the CEP WRMs were produced and certified as well as discussions pertaining to some of the problems encountered and how they were solved

  3. Program Evaluation - Automotive Lightweighting Materials Program Research and Development Projects Assessment of Benefits - Case Studies No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Das, S.

    2003-01-23

    This report is the second of a series of studies to evaluate research and development (R&D) projects funded by the Automotive Lightweighting Materials (ALM) Program of the Office of Advanced Automotive Technologies (OAAT) of the U.S. Department of Energy (DOE). The objectives of the program evaluation are to assess short-run outputs and long-run outcomes that may be attributable to the ALM R&D projects. The ALM program focuses on the development and validation of advanced technologies that significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. Funded projects range from fundamental materials science research to applied research in production environments. Collaborators on these projects include national laboratories, universities, and private sector firms, such as leading automobile manufacturers and their suppliers. Three ALM R&D projects were chosen for this evaluation: Design and Product Optimization for Cast Light Metals, Durability of Lightweight Composite Structures, and Rapid Tooling for Functional Prototyping of Metal Mold Processes. These projects were chosen because they have already been completed. The first project resulted in development of a comprehensive cast light metal property database, an automotive application design guide, computerized predictive models, process monitoring sensors, and quality assurance methods. The second project, the durability of lightweight composite structures, produced durability-based design criteria documents, predictive models for creep deformation, and minimum test requirements and suggested test methods for establishing durability properties and characteristics of random glass-fiber composites for automotive structural composites. The durability project supported Focal Project II, a validation activity that demonstrates ALM program goals and reduces the lead time for bringing new technology into the marketplace. Focal

  4. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    International Nuclear Information System (INIS)

    Beranich, S.J.

    1994-01-01

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed for mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process

  5. Habitat Evaluation Procedures (HEP) Report; Priest River Project, Technical Report 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Priest River property, an acquisition completed by the Kalispel Tribe of Indians in 2001. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Priest River Project provides a total of 140.73 Habitat Units (HUs) for the species evaluated. Conifer forest habitat provides 60.05 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Grassland meadow habitat provides 7.39 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 71.13 HUs for mallard, yellow warbler, and white-tailed deer. Open water habitat provides 2.16 HUs for Canada goose and mallard. The objective of using HEP at the Priest River Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  6. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2004

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Roegner, Curtis; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Johnson, Gary E.; Sobocinski, Kathryn L.; Anderson, Michael G.; Ebberts, Blaine

    2005-12-15

    The restoration of wetland salmon habitat in the tidal portion of the Columbia River is occurring at an accelerating pace and is anticipated to improve habitat quality and effect hydrological reconnection between existing and restored habitats. Currently multiple groups are applying a variety of restoration strategies in an attempt to emulate historic estuarine processes. However, the region lacks both a standardized means of evaluating the effectiveness of individual projects as well as methods for determining the cumulative effects of all restoration projects on a regional scale. This project is working to establish a framework to evaluate individual and cumulative ecosystem responses to restoration activities in order to validate the effectiveness of habitat restoration activities designed to benefit salmon through improvements to habitat quality and habitat opportunity (i.e. access) in the Columbia River from Bonneville Dam to the ocean. The review and synthesis of approaches to measure the cumulative effects of multiple restoration projects focused on defining methods and metrics of relevance to the CRE, and, in particular, juvenile salmon use of this system. An extensive literature review found no previous study assessing the cumulative effects of multiple restoration projects on the fundamental processes and functions of a large estuarine system, although studies are underway in other large land-margin ecosystems including the Florida Everglades and the Louisiana coastal wetlands. Literature from a variety of scientific disciplines was consulted to identify the ways that effects can accumulate (e.g., delayed effects, cross-boundary effects, compounding effects, indirect effects, triggers and thresholds) as well as standard and innovative tools and methods utilized in cumulative effects analyses: conceptual models, matrices, checklists, modeling, trends analysis, geographic information systems, carrying capacity analysis, and ecosystem analysis. Potential

  7. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    Science.gov (United States)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  8. Evaluation of transversal competencies: pilot project in a maths course for first-year business

    OpenAIRE

    Bosch Príncep, Manuela; Morillo, Isabel

    2013-01-01

    The aim of this communication is to describe the results of a pilot project for the assessment of the transversal competency "the capacity for learning and responsibility". This competency is centred on the capacity for the analysis, synthesis, overview, and practical application of newly acquired knowledge. It is proposed by the University of Barcelona in its undergraduate degree courses, through multidisciplinary teaching teams. The goal of the pilot project is to evaluate this competenc...

  9. Draft evaluation of the frequency for gas sampling for the high burnup confirmatory data project

    Energy Technology Data Exchange (ETDEWEB)

    Stockman, Christine T. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Alsaed, Halim A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bryan, Charles R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-03-26

    This report fulfills the M3 milestone M3FT-15SN0802041, “Draft Evaluation of the Frequency for Gas Sampling for the High Burn-up Storage Demonstration Project” under Work Package FT-15SN080204, “ST Field Demonstration Support – SNL”. This report provides a technically based gas sampling frequency strategy for the High Burnup (HBU) Confirmatory Data Project. The evaluation of: 1) the types and magnitudes of gases that could be present in the project cask and, 2) the degradation mechanisms that could change gas compositions culminates in an adaptive gas sampling frequency strategy. This adaptive strategy is compared against the sampling frequency that has been developed based on operational considerations. Gas sampling will provide information on the presence of residual water (and byproducts associated with its reactions and decomposition) and breach of cladding, which could inform the decision of when to open the project cask.

  10. A method multi criterio to evaluate projects of rural electrification; Un metodo multicriterio para evaluar proyectos de electrificacion rural

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez Posse, E

    1994-07-01

    In this document about the problem of the evaluation projects methodologies in rural electrification.The low analysis problem is of complex nature, because each project is evaluation object and an economic agent. One of these agents identifies different benefits and cost, and also has a different approaches for value them.In consequence, the form in that it is carried out the evaluation of the one project for each one of this agents that it is usually solved for mechanisms linked to the capacity of incidence or of determination of each one of them, this does not assures a satisfactory results for the general interest.

  11. Dialogue and cooperation in musical partnerships : evaluation report The Operaflat, a project by Yo! Opera Festival

    NARCIS (Netherlands)

    Bressers, Hilde

    Yo! Opera asked the Lectorate Lifelong Learning in Music to evaluate the project The Operaflat, which was part of the fourth edition of the Yo! Opera Festival in Utrecht, in 2007. During the project primary school pupils of the public primary school ‘Openbare Basisschool Overvecht’, residents of the

  12. Habitat Evaluation Procedures (HEP) Report; Calispell Creek Project, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Calispell Creek property, an acquisition completed by the Kalispel Tribe of Indians in February 2004. Evaluation species and appropriate models include Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Calispell Creek Project provides a total of 138.17 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 5.16 HUs for mallard and muskrat. Grassland provides 132.02 HUs for mallard and Canada goose. Scrub-shrub vegetation provides 0.99 HUs for yellow warbler and white-tailed deer. The objective of using HEP at the Calispell Creek Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  13. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  14. Numerical evaluation of methods for computing tomographic projections

    International Nuclear Information System (INIS)

    Zhuang, W.; Gopal, S.S.; Hebert, T.J.

    1994-01-01

    Methods for computing forward/back projections of 2-D images can be viewed as numerical integration techniques. The accuracy of any ray-driven projection method can be improved by increasing the number of ray-paths that are traced per projection bin. The accuracy of pixel-driven projection methods can be increased by dividing each pixel into a number of smaller sub-pixels and projecting each sub-pixel. The authors compared four competing methods of computing forward/back projections: bilinear interpolation, ray-tracing, pixel-driven projection based upon sub-pixels, and pixel-driven projection based upon circular, rather than square, pixels. This latter method is equivalent to a fast, bi-nonlinear interpolation. These methods and the choice of the number of ray-paths per projection bin or the number of sub-pixels per pixel present a trade-off between computational speed and accuracy. To solve the problem of assessing backprojection accuracy, the analytical inverse Fourier transform of the ramp filtered forward projection of the Shepp and Logan head phantom is derived

  15. Implications of commodity price risk and operating leverage on petroleum project economic evaluations

    International Nuclear Information System (INIS)

    Salahor, G.; Laughton, D.G.

    1999-01-01

    The modern asset pricing method, MAP, can provide businesses with improved tools for economic analysis. This in turn leads to greater precision in the analysis of the effects of the following parameters: project structure, time, and uncertainty. This greater precision with MAP extends to analysis of the possibility for active control of the decision alternatives for managers in the petroleum business, especially where this possibility is not questioned. A methodology is developed as a model that quantifies revenue risk based on the nature of commodity price volatility and the accepted price of risk in the commodity market. A mathematical description is included of a natural gas log-normal distribution incorporating the annual volatility in the forecast, and a measure of the rate at which volatility decreases in the long run in the forecast. Give this volatility model, a risk discount factor is determinable and applicable to the current expectation of the commodity prices at a given time, and a discount time factor of all parts of the cash flow stream. Cases are used to evaluate a natural gas development project for the purpose of yielding scenarios for capital vs. operating cost trade-offs, price risk management, production profile, and the effect of the reverting vs. non-reverting price model. In application one, a comparison is made of discounted cash flow (DCF) to MAP evaluations giving a perspective on the various development choices which a producer has through third-party service providers. Further, an example is used to compare the two methods as alternative evaluations of development alternatives to speed up or slow down the production rate and decline profile of a gas field. As in the first example, the DCF discounting is higher than the net discounting in the MAP evaluation. But in this example both methods produce the same project structure decision. The small amount of incremental capital and operating costs needed for the higher production case are

  16. An Object-Based Approach to Evaluation of Climate Variability Projections and Predictions

    Science.gov (United States)

    Ammann, C. M.; Brown, B.; Kalb, C. P.; Bullock, R.

    2017-12-01

    Evaluations of the performance of earth system model predictions and projections are of critical importance to enhance usefulness of these products. Such evaluations need to address specific concerns depending on the system and decisions of interest; hence, evaluation tools must be tailored to inform about specific issues. Traditional approaches that summarize grid-based comparisons of analyses and models, or between current and future climate, often do not reveal important information about the models' performance (e.g., spatial or temporal displacements; the reason behind a poor score) and are unable to accommodate these specific information needs. For example, summary statistics such as the correlation coefficient or the mean-squared error provide minimal information to developers, users, and decision makers regarding what is "right" and "wrong" with a model. New spatial and temporal-spatial object-based tools from the field of weather forecast verification (where comparisons typically focus on much finer temporal and spatial scales) have been adapted to more completely answer some of the important earth system model evaluation questions. In particular, the Method for Object-based Diagnostic Evaluation (MODE) tool and its temporal (three-dimensional) extension (MODE-TD) have been adapted for these evaluations. More specifically, these tools can be used to address spatial and temporal displacements in projections of El Nino-related precipitation and/or temperature anomalies, ITCZ-associated precipitation areas, atmospheric rivers, seasonal sea-ice extent, and other features of interest. Examples of several applications of these tools in a climate context will be presented, using output of the CESM large ensemble. In general, these tools provide diagnostic information about model performance - accounting for spatial, temporal, and intensity differences - that cannot be achieved using traditional (scalar) model comparison approaches. Thus, they can provide more

  17. Evaluation of functioning of ICDS project areas under Indore and Ujjain divisions of the state of Madhya Pradesh

    Directory of Open Access Journals (Sweden)

    Sanjay Dixit

    2010-07-01

    Full Text Available Background: Integrated Child Development Services (ICDS is recognized worldwide as one of the most efficient community based programmes promoting early childhood care. Regular evaluations of the programme have been conducted to make it more effective and adequate for the beneficiaries. Objectives: To evaluate the functioning of the Anganwadi Centers under different project areas of Indore and Ujjain Divisions. Methods: Under the present evaluation system one ICDS project and five Anganwadi Centers under the project area (AWCs were visited on a monthly basis and services provided reviewed. Findings reported are from nine project areas under Indore and Ujjain Divisions in the state of Madhya Pradesh from October 2008 – June 2009. Results: A total of 45 centers were evaluated. 29 centers were operating from rented buildings and storage facilities were lacking at 19 of the centers. Though the quality of food was acceptable to the beneficiaries shortage of food was a problem at the centers. Absence of Pre-School Education (PSE and Nutrition and Health Education (NHED Kits compromised PSE and NHED activities at the centers. Unavailability of medicine kits, lack of regular visits by the ANMs to the centers and absence of routine health check up of beneficiaries were other problems encountered under the project areas surveyed. Availability of a doctor under each project area was stated as a major need by the workers. Conclusion: Coordinated steps catering to different services provided at the centers are needed to optimize the functioning of the ICDS scheme.

  18. Evaluation of the Parent-Implemented Communication Strategies (PiCS) Project Using the Multiattribute Utility (MAU) Approach

    Science.gov (United States)

    Stoner, Julia B.; Meadan, Hedda; Angell, Maureen E.; Daczewitz, Marcus

    2012-01-01

    We conducted a multiattribute utility (MAU) evaluation to assess the Parent-Implemented Communication Strategies (PiCS) project which was funded by the Institute of Education Sciences (IES). In the PiCS project parents of young children with developmental disabilities are trained and coached in their homes on naturalistic and visual teaching…

  19. Project W-314 specific test and evaluation plan for AZ tank farm upgrades

    International Nuclear Information System (INIS)

    Hays, W.H.

    1998-01-01

    The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation

  20. Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-08-01

    Full Text Available The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract The question is, was the optimum implementation accomplished? The provision for the success of the project is how are the daily activities managed by the three stakeholders of the project (contractor, owner, and consultant and their technical and practical capability to attain the balance of the project fundamental points (cost, time and quality taking into account the project objectives that were set by the owner. Despite the way, logical framework management and project’s major steps there is a group of elements which become major measures to determine the success or failure of the project, the research interested in these elements by a thorough study of references related to the success of a constructional project. To reinforce the theoretical study a field assessment of the housing project; this led to the recognition of the major elements that caused breaches of the evaluation criteria. The closed questionnaire and the regular forms based on the data and information collected through the theoretical review and the closed questionnaire to conclude and examine some concepts related by assessing the quality of building materials used in residential investment projects through the stages (planning - design-implementation Through the research a lot of deductions were made, the most important is that there cannot be an evaluation system

  1. Review of the TMI-2 accident evaluation and vessel investigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Ladekarl Thomsen, Knud

    1998-03-01

    The results of the TMI-2 Accident Evaluation Programme and the Vessel Investigation Project have been reviewed as part of a literature study on core meltdown and in-vessel coolability. The emphasis is placed on the late phase melt progression, which is of special relevance to the NKS-sponsored RAK-2.1 project on Severe Accident Phenomenology. The body of the report comprises three main sections, The TMI-2 Accident Scenario, Core Region and Relocation Path Investigations, and Lower Head Investigations. In the final discussion, the lower head gap formation mechanism is explained in terms of thermal contraction and fracturing of the debris crust. This model seems more plausible than the MAAP model based on creep expansion of the lower head. (au) 1 tab., 33 ills., 31 refs.

  2. The International Criticality Safety Benchmark Evaluation Project on the Internet

    International Nuclear Information System (INIS)

    Briggs, J.B.; Brennan, S.A.; Scott, L.

    2000-01-01

    The International Criticality Safety Benchmark Evaluation Project (ICSBEP) was initiated in October 1992 by the US Department of Energy's (DOE's) defense programs and is documented in the Transactions of numerous American Nuclear Society and International Criticality Safety Conferences. The work of the ICSBEP is documented as an Organization for Economic Cooperation and Development (OECD) handbook, International Handbook of Evaluated Criticality Safety Benchmark Experiments. The ICSBEP Internet site was established in 1996 and its address is http://icsbep.inel.gov/icsbep. A copy of the ICSBEP home page is shown in Fig. 1. The ICSBEP Internet site contains the five primary links. Internal sublinks to other relevant sites are also provided within the ICSBEP Internet site. A brief description of each of the five primary ICSBEP Internet site links is given

  3. Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projects

    International Nuclear Information System (INIS)

    Rosso, M.; Bottero, M.; Pomarico, S.; La Ferlita, S.; Comino, E.

    2014-01-01

    The use of hydroelectric potential and the protection of the river ecosystem are two contrasting aspects that arise in the management of the same resource, generating conflicts between different stakeholders. The purpose of the paper is to develop a multi-level decision-making tool, able to support energy planning, with specific reference to the construction of hydropower plants in mountain areas. Starting from a real-world problem concerning the basin of the Sesia Valley (Italy), an evaluation framework based on the combined use of Multicriteria Evaluation and Stakeholders Analysis is proposed in the study. The results of the work show that the methodology is able to grant participated decisions through a multi-stakeholders traceable and transparent assessment process, to highlight the important elements of the decision problem and to support the definition of future design guidelines. - Highlights: • The paper concerns a multi-level decision-making tool able to support energy planning. • The evaluation framework is based on the use of AHP and Stakeholders Analysis. • Hydropower projects in the Sesia Valley (Italy) are evaluated and ranked in the study. • Environmental, economic, technical and sociopolitical criteria have been considered. • 42 stakeholder groups have been included in the evaluation

  4. Evaluation of an LED Retrofit Project at Princeton University’s Carl Icahn Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Murphy, Arthur L. [Princeton Univ., NJ (United States); Perrin, Tess E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-11-25

    The LED lighting retrofit at the Carl Icahn Laboratory of the Lewis-Sigler Institute for Integrative Genomics was the first building-wide interior LED project at Princeton University, following the University’s experiences from several years of exterior and small-scale interior LED implementation projects. The project addressed three luminaire types – recessed 2x2 troffers, cove and other luminaires using linear T8 fluorescent lamps, and CFL downlights - which combined accounted for over 564,000 kWh of annual energy, over 90% of the lighting energy used in the facility. The Princeton Facilities Engineering staff used a thorough process of evaluating product alternatives before selecting an acceptable LED retrofit solution for each luminaire type. Overall, 815 2x2 luminaires, 550 linear fluorescent luminaires, and 240 downlights were converted to LED as part of this project. Based solely on the reductions in wattage in converting from the incumbent fluorescent lamps to LED retrofit kits, the annual energy savings from the project was over 190,000 kWh, a savings of 37%. An additional 125,000 kWh of energy savings is expected from the implementation of occupancy and task-tuning control solutions, which will bring the total savings for the project to 62%.

  5. A method for evaluating the funding of components of natural resource and conservation projects

    Energy Technology Data Exchange (ETDEWEB)

    Wellington, John F., E-mail: welling@ipfw.edu [Indiana University – Purdue University Fort Wayne (IPFW), Doermer School of Business, 203 Stonegate Drive Erie, PA 16505 (United States); Lewis, Stephen A., E-mail: lewis.sa07@gmail.com [Mongrel Works, LLC., Columbus, OH 43209 (United States)

    2016-02-15

    Many public and private entities such as government agencies and private foundations have missions related to the improvement, protection, and sustainability of the environment. In pursuit of their missions, they fund projects with related outcomes. Typically, the funding scene consists of scarce funding dollars for the many project requests. In light of funding limitations and funder's search for innovative funding schemes, a method to support the allocation of scarce dollars among project components is presented. The proposed scheme has similarities to methods in the project selection literature but differs in its focus on project components and its connection to and enumeration of the universe of funding possibilities. The value of having access to the universe is demonstrated with illustrations. The presentation includes Excel implementations that should appeal to a broad spectrum of project evaluators and reviewers. Access to the space of funding possibilities facilitates a rich analysis of funding alternatives. - Highlights: • Method is given for allocating scarce funding dollars among competing projects. • Allocations are made to fund parts of projects • Proposed method provides access to the universe of funding possibilities. • Proposed method facilitates a rich analysis of funding possibilities. • Excel spreadsheet implementations are provided.

  6. A Study on Evaluation of the Biology Projects Submitted to the TUBITAK Secondary Education Research Projects Contest from the Bursa Region

    Science.gov (United States)

    Zeren Özer, Dilek; Güngör, Sema Nur; Özkan, Muhlis

    2015-01-01

    This study evaluates, through the employment of scientific methods and techniques, a total of 107 Biology projects submitted by secondary education students to the Bursa Region Coordinatorship of TUBITAK (a region which encompasses the municipalities of Afyonkarahisar, Balikesir, Bilecik, Canakkale, Eskisehir, Kutahya, and Yalova). The projects…

  7. [Domestic elder abuse and neglect--conclusions from the evaluation of a model project].

    Science.gov (United States)

    Görgen, T; Nägele, B

    2005-02-01

    The main task of a federally funded model project in the German city of Hannover was to develop approaches for prevention and intervention in the field of domestic elder abuse. Over a three year period (1998-2001), different approaches--like a telephone helpline for senior citizens, and social workers operating as counsellors for elderly people and their relatives--were tested at a local level. The paper presents results from the evaluation of the project and draws conclusions for future prevention and intervention in the field. The authors argue that the explicit use of the conceptual framework of "violence"/"abuse" creates potentials for scandalizing the issue and is therefore supportive for media appearance, whereas it can impede the approach to the main target groups (elderly people and their relatives) and reduce accessibility of counselling services for potential clients. In the light of evaluation results the focus of the project ("domestic elder abuse" or "violence against elderly people in close relationships") was too narrow for a local project. Counselling services were used in a relatively small number of cases; analyses of cases show that incidents of domestic elder abuse are often embedded in complex problem constellations. Cases brought to the attention of the model project were multifaceted and not limited to incidents of neglect and abuse of elderly care recipients caused by caregiver overload. Cases of intimate violence in partnerships and of intergenerational violence without any of the participants being dependent on care show the need to develop a broader concept of domestic elder abuse. Integration of the concepts of domestic violence, violence against women, elder abuse/neglect and abuse/neglect in caregiving relationships is necessary on a conceptual level as well as on the level of interagency cooperation of institutions dealing with cases of "elder abuse".

  8. Process evaluation of an interorganizational cooperation initiative in vocational rehabilitation: the Dirigo project.

    Science.gov (United States)

    Ståhl, Christian; Andersén, Åsa; Anderzén, Ingrid; Larsson, Kjerstin

    2017-05-11

    This study analyzes the process of establishing and developing a cooperative vocational rehabilitation project with special focus on organizational and professional aspects. In the project, officials from the Swedish Social Insurance Agency and the Swedish Public Employment Service worked cooperatively with participants on long-term sick leave, youths with disability benefits, and people receiving social allowances. The officials used Motivational Interviewing (MI) as a method when meeting participants, and were able to offer flexible and tailored case management. The goal was to improve work ability and promote self-sufficiency. The process evaluation was carried out through continuous data collection throughout the project (2012-2014), resulting in a total of 28 individual interviews and 17 focus groups with officials and managers. The material was categorized through an inductive content analysis, and analyzed using social capital as a theoretical frame. The evaluation points to how issues related to design, organization and management contributed to the project not reaching its goals, e.g. problems with recruitment of participants, the funding structure, and staffing problems on the managerial level. Still, officials reported positive effects of close cooperation, which was perceived as facilitating the case management by fostering a mutual understanding and access to resources and rehabilitation measures from more than one authority. Cooperative work combined with the use of MI and flexible case management seem to promote an increased trust between officials from different authorities and participants, which in the study is conceptualized as bonding and bridging social capital (between officials) and linking social capital (between officials and participants). The organizational problems combined with the relatively large differences in approaches between the project and regular practice obstructed implementation, where the authorities involved did not appear

  9. Process evaluation of an interorganizational cooperation initiative in vocational rehabilitation: the Dirigo project

    Directory of Open Access Journals (Sweden)

    Christian Ståhl

    2017-05-01

    Full Text Available Abstract Background This study analyzes the process of establishing and developing a cooperative vocational rehabilitation project with special focus on organizational and professional aspects. In the project, officials from the Swedish Social Insurance Agency and the Swedish Public Employment Service worked cooperatively with participants on long-term sick leave, youths with disability benefits, and people receiving social allowances. The officials used Motivational Interviewing (MI as a method when meeting participants, and were able to offer flexible and tailored case management. The goal was to improve work ability and promote self-sufficiency. Methods The process evaluation was carried out through continuous data collection throughout the project (2012–2014, resulting in a total of 28 individual interviews and 17 focus groups with officials and managers. The material was categorized through an inductive content analysis, and analyzed using social capital as a theoretical frame. Results The evaluation points to how issues related to design, organization and management contributed to the project not reaching its goals, e.g. problems with recruitment of participants, the funding structure, and staffing problems on the managerial level. Still, officials reported positive effects of close cooperation, which was perceived as facilitating the case management by fostering a mutual understanding and access to resources and rehabilitation measures from more than one authority. Conclusions Cooperative work combined with the use of MI and flexible case management seem to promote an increased trust between officials from different authorities and participants, which in the study is conceptualized as bonding and bridging social capital (between officials and linking social capital (between officials and participants. The organizational problems combined with the relatively large differences in approaches between the project and regular practice

  10. Evaluating experience with electricity generating GHG mitigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, J.

    2003-07-01

    Several programmes have been initiated to encourage the development of projects that mitigate emissions of greenhouse gases. Recent programmes have been undertaken at the national level, such as the Dutch five-track approach, including contracts with multilateral institutions, regional development banks, private banks, bilateral contracts with countries, participation in carbon funds and the ERUPT and CERUPT tenders, Japanese Clean Development Mechanism (CDM) feasibility studies, and the more recent Finnish, Austrian and Italian JI/CDM programmes. International programmes, such as the World Bank's Prototype Carbon Fund (and other WB carbon funds), have also been initiated. Individual projects not belonging to particular programmes have also been initiated under the pilot phase of 'activities implemented jointly' (AIJ) under the United Nations Framework Convention on Climate Change (UNFCCC), or developed as CDM or Joint Implementation (JI) projects. Some CDM project activities have been formally submitted to the CDM's Executive Board (EB), who approved the first set of baseline and monitoring methodologies for CDM project activities in July 2003. There is a large variety in the type of projects that have been put forward. These include energy, industry, forestry and waste projects. This paper will focus on CDM-type projects that generate grid-connected electricity for several reasons: demand for electricity is growing rapidly in many potential host countries; many projects in the electricity sector have been developed as potential CDM and JI projects; assessing additionality and baselines is arguably more difficult for projects in the electricity sector (where a range of project types may occur as part of business-as-usual activities) than for end-of-pipe projects such as landfill gas capture and flaring or decomposition of F-gases; much work has been done on assessing appropriate methods to determine baselines in the electricity sector, at the

  11. Engineering design and economic evaluation of a family-sized biogas project in Nigeria

    International Nuclear Information System (INIS)

    Adeoti, O.; Ilori, M.O.; Oyebisi, T.O.; Adekoya, L.O.

    2000-01-01

    To woo householders into harnessing the cooking energy potential of biogas in order to solve the perennial cooking energy problems at household level in Nigeria, this paper carried out the engineering design requirement, and used the discounted cash flow micro-economic assessments to evaluate the 6.0 m 3 family-sized biogas project in Nigeria. The project has an initial investment cost of 41,088 Naira, annual expenditure of 5909 Naira and an annual benefit of 13,347 Naira. The NPV, IRR, B/C and payback period of financial analysis are 0.050 million Naira, 17.52%, 2.26 and 6.6 years respectively. This shows that the 6.0 m 3 family-sized biogas project using cattle dung as substrate in Nigeria has a good economic potential. (author)

  12. A Study on the Evaluation of Science Projects of Primary School Students Based on Scientific Criteria

    Science.gov (United States)

    Gungor, Sema Nur; Ozer, Dilek Zeren; Ozkan, Muhlis

    2013-01-01

    This study re-evaluated 454 science projects that were prepared by primary school students between 2007 and 2011 within the scope of Science Projects Event for Primary School Students. Also, submitted to TUBITAK BIDEB Bursa regional science board by MNE regional work groups in accordance with scientific research methods and techniques, including…

  13. Bilingual Readiness for Achieving through Valued Opportunities (Project BRAVO) Final Evaluation Report, 1992-93. OREA Report.

    Science.gov (United States)

    Choonoo, John

    This report presents an evaluation of the Bilingual Readiness for Achieving through Valued Opportunities (Project BRAVO), an Elementary and Secondary Education Act Title VII-funded project in its first year of operation at Boys and Girls High School in Brooklyn (New York) and Louis D. Brandeis High School in Manhattan (New York). Participating…

  14. Decision support for choice optimal power generation projects: Fuzzy comprehensive evaluation model based on the electricity market

    International Nuclear Information System (INIS)

    Liang Zhihong; Yang Kun; Sun Yaowei; Yuan Jiahai; Zhang Hongwei; Zhang Zhizheng

    2006-01-01

    In 2002, China began to inspire restructuring of the electric power sector to improve its performance. Especially, with the rapid increase of electricity demand in China, there is a need for non-utility generation investment that cannot be met by government finance alone. However, a first prerequisite is that regulators and decision-makers (DMs) should carefully consider how to balance the need to attract private investment against the policy objectives of minimizing monopoly power and fostering competitive markets. So in the interim term of electricity market, a decentralized decision-making process should eventually replace the centralized generation capacity expansion planning. In this paper, firstly, on the basis of the current situation, a model for evaluating generation projects by comprehensive utilization of fuzzy appraisal and analytic hierarchy process (AHP) is developed. Secondly, a case study of generation project evaluation in China is presented to illustrate the effectiveness of the model in selecting optimal generation projects and attracting private investors. In the case study, with considerations of attracting adequate private investment and promoting energy conservation in China, five most promising policy instruments selected as evaluation factors include project duration, project costs, predicted on-grid price level, environmental protection, enterprise credit grading and performance. Finally, a comprehensive framework that enables the DM to have better concentration and to make more sound decisions by combining the model proposed with modern computer science is designed

  15. Hanford spent nuclear fuel project recommended path forward, volume III: Alternatives and path forward evaluation supporting documentation

    International Nuclear Information System (INIS)

    Fulton, J.C.

    1994-10-01

    Volume I of the Hanford Spent Nuclear Fuel Project - Recommended Path Forward constitutes an aggressive series of projects to construct and operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. Volume II provided a comparative evaluation of four Alternatives for the Path Forward and an evaluation for the Recommended Path Forward. Although Volume II contained extensive appendices, six supporting documents have been compiled in Volume III to provide additional background for Volume II

  16. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  17. Evaluating Tobacco Control Policies in 28 Countries (including 9 EU countries: The ITC Project

    Directory of Open Access Journals (Sweden)

    Geoffrey Fong

    2016-03-01

    Full Text Available Since its start in 2002, the ITC Project has been conducting evaluation studies of tobacco control policies via prospective cohort surveys of tobacco users in 28 countries, including 9 EU countries. This presentation will focus on the design of the ITC Project and how it differs from and complements existing evidence-gathering systems (monitoring and surveillance systems in measuring and understanding the impact of FCTC policies. The presentation will also describe the ITC Project's most recent initiatives: (1 the EUREST-PLUS study focusing on measuring the impact of the Tobacco Products Directive, and (2 a large-scale international cohort study of e-cigarettes starting in the United States, Canada, England, and Australia.

  18. A novel evaluation method for building construction project based on integrated information entropy with reliability theory.

    Science.gov (United States)

    Bai, Xiao-ping; Zhang, Xi-wei

    2013-01-01

    Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  19. The Risk Evaluation of Agricultural High-tech Investment Project%农业高新技术投资项目风险评价

    Institute of Scientific and Technical Information of China (English)

    陆迁; 苗姗姗

    2005-01-01

    The agricultural high-tech investment project (AHIP) is characterized by technology-intensive, high risk and great profit. This article analyzes essential factors of the risks of the agricultural high-tech investment projects and the traditional risk evaluation method of agricultural projects. We think that the applications of the sensitivity analysis and probability are defective. Therefore, this article introduces a structural model to evaluate the risks of the agricultural high-tech investment projects and the system of the concrete evaluation indexes.

  20. EVALUATION OF THE IMPACT OF INNOVATIVE PROJECTS ON THE COMPETITIVENESS OF AGRICULTURAL HOLDINGS IN SLOVAK REPUBLIC

    Directory of Open Access Journals (Sweden)

    Ľubica RUMANOVSKÁ

    2013-01-01

    Full Text Available The scientific paper evaluates the impact of innovative projects on the competitiveness of agricultural holdings in SR. Evaluation of the impact of innovative projects on competitiveness of agricultural holdings was realized on the selected holdings in Nitra and Trnava region. For the evaluation was used RCR coefficient. With the use of RCR coefficient could be confirmed the scientific hypothesis - The innovative projects realized through Program for rural development SR 2007-2013 have positive impact on competitiveness of agricultural holdings. The possibilities for EU financial support for innovative projects in SR represent important source for introduction of new innovative technologies into production process and in future they can significantly contribute to the growth of competitiveness of agricultural subjects. Therefore, to increase competitiveness of agricultural holdings it is important to focus on modernization of machinery and buildings, use of natural sources for energy production, but also to increase the education and the flow of information between rural inhabitants, mainly farmers. In competitive area of EU agricultural sector it is necessary that agricultural holdings will innovate, not only to create independent flow of innovative products and knowledge, but also to increase its value on internal market. Agricultural holdings –receivers of financial support – have expressed the opinion that financial support realized through PRD SR 2007-2013 had definitely allowed them to implement new processes and products.

  1. Evaluating Retirement Income Security for Illinois Public School Teachers. Public Pension Project Report

    Science.gov (United States)

    Johnson, Richard W.; Southgate, Benjamin G.

    2014-01-01

    The financial problems afflicting the Illinois teacher pension plan have grabbed headlines. An equally important problem, though underappreciated, is that relatively few teachers benefit much from the plan. This report evaluates the pension benefits provided to Illinois public school teachers. The researchers project annual and lifetime pension…

  2. Habitat Evaluation Procedures (HEP) Report; West Beaver Lake Project, Technical Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-05-01

    On September 7, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the West Beaver Lake property, an acquisition completed by the Kalispel Tribe of Indians in September 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, mallard, muskrat, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The West Beaver Lake Project provides a total of 82.69 Habitat Units (HUs) for the species evaluated. Emergent wetland habitat provides 8.80 HUs for mallard, muskrat, and Canada goose. Conifer forest habitat provides 70.33 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Open water provides 3.30 HUs for mallard, muskrat, and Canada goose. The objective of using HEP at the West Beaver Lake Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  3. Habitat Evaluation Procedures (HEP) Report; Upper Trimble Project, Technical Report 2004-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 13, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Upper Trimble property, an acquisition completed by the Kalispel Tribe of Indians in March 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Upper Trimble Project provides a total of 250.67 Habitat Units (HUs) for the species evaluated. Wet meadow provides 136.92 HUs for mallard, muskrat, and Canada goose. Mixed forest habitat provides 111.88 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. Scrub-shrub vegetation provides 1.87 HUs for yellow warbler, and white-tailed deer. The objective of using HEP at the Upper Trimble Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  4. Environmental evaluation Methodology as part, of the project multi-aspect evaluation of the portfolio of ISAGEN options

    International Nuclear Information System (INIS)

    Ayala R, Ana Victoria

    2001-01-01

    ISAGEN designed and applied a multi-aspect methodology to classify and compare projects of the company's electricity generation options portfolio. It was developed from a holistic vision, integrating multidisciplinary information from the economic, environmental and technical aspects. This helped to classify the alternatives based on the sum of the values obtained for the different considered aspects. This document presents, in general form, the procedure adopted for the index formulation and selection of factors including the variables corresponding to the sub-aspects (or environmental dimensions) physical, biotic and social. The investigation's work, selection and classification of the variables were developed by an interdisciplinary group of experimented professionals in the environmental evaluation of projects. The integration of the three sub-aspects (physical, biotic and social) resulted in a hierarchy of projects based on environmental considerations, which were finally articulated with the respective values obtained from the technical and economical aspects. In general, the results obtained in each sub-aspect agreed with the hierarchy of projects based on an expert concept previous to the method application. In synthesis, it was observed that this technique is of great utility to make comparisons and general classifications because it allows to take advantage of information with different characteristics and include assumptions or artificial modifiable methodological items that reflect the structure of the deciding agents preferences at any given time

  5. An Application of the PMI Model at the Project Level: Evaluation of the ESEA Title IV C Fresh Start Minischool Project.

    Science.gov (United States)

    Harrison, Patricia C.

    The Planning, Monitoring, and Implementation Model (PMI) was developed to provide a model for systematic evaluation of educational programs to determine their effectiveness in achieving goals and objectives. This paper demonstrates the applicability of the PMI model at the project level. Fresh Start Minischool at Ballou High School (District of…

  6. The Sagebrush Steppe Treatment Evaluation Project (SageSTEP): a test of state-and-transition theory

    Science.gov (United States)

    James D. McIver; Mark Brunson; Steve C. Bunting; Jeanne Chambers; Nora Devoe; Paul Doescher; James Grace; Dale Johnson; Steve Knick; Richard Miller; Mike Pellant; Fred Pierson; David Pyke; Kim Rollins; Bruce Roundy; Eugene Schupp; Robin Tausch; David Turner

    2010-01-01

    The Sagebrush Steppe Treatment Evaluation Project (SageSTEP) is a comprehensive, integrated, long-term study that evaluates the ecological effects of fire and fire surrogate treatments designed to reduce fuel and to restore sagebrush (Artemisia spp.) communities of the Great Basin and surrounding areas. SageSTEP has several features that make it ideal for testing...

  7. A conceptual framework for the evaluation of cost-effectiveness of projects to reduce GHG emissions and sequester carbon

    International Nuclear Information System (INIS)

    Sathaye, J.; Norgaard, R.; Makundi, W.

    1993-07-01

    This paper proposes a conceptual framework for evaluating the cost of projects to reduce atmospheric greenhouse gases (GHGs). The evaluation of cost-effectiveness should account for both the timing of carbon emissions and the damage caused by the atmospheric stock of carbon. We develop a conceptual basis to estimate the cost-effectiveness of projects in terms of the cost of reducing atmospheric carbon (CRAC) and other GHGs. CRAC accounts for the economic discount rate, alternative functional forms of the shadow price, the residence period of carbon in the atmosphere, and the multiple monetary benefits of projects. The last item is of particular importance to the developing countries

  8. Development of a volumetric projection technique for the digital evaluation of field of view.

    Science.gov (United States)

    Marshall, Russell; Summerskill, Stephen; Cook, Sharon

    2013-01-01

    Current regulations for field of view requirements in road vehicles are defined by 2D areas projected on the ground plane. This paper discusses the development of a new software-based volumetric field of view projection tool and its implementation within an existing digital human modelling system. In addition, the exploitation of this new tool is highlighted through its use in a UK Department for Transport funded research project exploring the current concerns with driver vision. Focusing specifically on rearwards visibility in small and medium passenger vehicles, the volumetric approach is shown to provide a number of distinct advantages. The ability to explore multiple projections of both direct vision (through windows) and indirect vision (through mirrors) provides a greater understanding of the field of view environment afforded to the driver whilst still maintaining compatibility with the 2D projections of the regulatory standards. Field of view requirements for drivers of road vehicles are defined by simplified 2D areas projected onto the ground plane. However, driver vision is a complex 3D problem. This paper presents the development of a new software-based 3D volumetric projection technique and its implementation in the evaluation of driver vision in small- and medium-sized passenger vehicles.

  9. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  10. Report of the evaluation by the project evaluation committee on research and development of FBR structural materials. Result intermediate evaluation in fiscal year 2002

    International Nuclear Information System (INIS)

    2003-03-01

    The project evaluation committee of FBR (Fast Breeder Reactor) and fuel cycle evaluated the problem under the evaluation method defined by the committee on the basis of material and supplementary data produced by JNC (Japan Nuclear Cycle Development Institute) and discussion. This report consists of summary, construction of the committee, investigation process, evaluation method, opinion of object, plan, research system, results, relation to practical use, public offering of results, development and others and total evaluation. Each opinion of the committee member are reported. Development of structural material is important problem of R and D of FBR. The estimation techniques of materials, high temperature structural and earthquake-resistant design techniques are evaluated to obtain the fruitful results. The remarkable results are development of materials of 316FR, using plate to reactor, estimation method of thermal striping, improvement of earthquake-resistant analysis technology, contribution to evaluation analysis of Monju second liner and basic information to develop quantity technique of material damage. (S.Y.)

  11. Overview and Evaluation of the NESC Projects for Fracture Assessments of Nuclear Components

    International Nuclear Information System (INIS)

    Sattari-Far, Iradj; Lorentzon, Mikael

    2011-02-01

    The overall objective of the NESC network has been to examine the reliability of the entire process of structural integrity assessment within an international framework. Within this network, six projects were conducted under the period of 1993-2008. The main targets of these projects were: NESC-I: This project evaluated the interactions among various technical disciplines applied to the integrity assessment of a large-scale thermally shocked spinning cylinder experiment. The cylinder test was designed to simulate selected conditions associated with an ageing flawed reactor pressure vessel. NESC-II: This project was on brittle crack initiation, propagation and arrest of shallow cracks in clad vessels under PTS loading. The results of this project underlined the conservatism of existing defects assessment procedures for shallow RPV flaws. NESC-III: This project was to quantify the accuracy of structural integrity assessment procedures for defects in dissimilar welds. The project was built around the conducted ADIMEW-project to share its overall objectives and to provide additional input. NESC-IV: This project was an experimental/analytical program to develop validated analysis methods for transferring fracture toughness data generated on standard test specimens to shallow flaws in reactor pressure vessel welds subject to biaxial loading in the lower-transition temperature region. NESC-V: This project aimed to develop a European multi-level procedure for handling of thermal fatigue phenomena in the nuclear power plant components. It also aimed to create a database of service and mock-up data for better understanding of thermal fatigue damage mechanisms. NESC-VI: This project was an extension of the NESC-IV project. Embedded subclad racks in beam specimens under uniaxial loading were studied to study the transferability of fracture toughness data between different crack configurations. This report gives an overview report of these six NESC projects. The reports cover

  12. A Novel Evaluation Method for Building Construction Project Based on Integrated Information Entropy with Reliability Theory

    Directory of Open Access Journals (Sweden)

    Xiao-ping Bai

    2013-01-01

    Full Text Available Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  13. Evaluation of Sustainable Practices within Project Management Methods

    Directory of Open Access Journals (Sweden)

    Shah Satya

    2017-01-01

    Full Text Available The purpose of this research study is to investigate some of the sustainable practices within projects with a focus on social projects. The different research methodologies applied through this research consisted both primary and secondary research, including literature review and through case study. The stakeholder’s behavioural needs towards acting and implementing sustainable practices led to the adoption of sustainable practices within projects which are managed across profit and non-profit organisations. Nevertheless, lack of sustainable behaviour was outlined, and henceforth the integration of sustainable development within social projects is crucially important as such projects were identified as the drivers toward educating the society in order to help to produce generations of people who would be more sustainably aware. Currently, sustainable development is very often taken into account when it comes to managing projects. Nevertheless, if the adoption of sustainable practices is well established in some sectors such as construction, literature tends to demonstrate a lack of information regarding other sectors, especially within social projects. This research aims to investigate the adoption of sustainable practices within social projects and therefore to satisfy a literature gap.

  14. Performance measures for evaluating multi-state projects.

    Science.gov (United States)

    2011-09-01

    "Freight transportation projects require an analytic process that considers the impacts of geographic and industry distribution of project : benefits, intermodal impacts, and reliability, as well as the traditional benefits of time savings, safety en...

  15. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  16. Evaluation of the PV minigrid communal system project in La Venturosa Colombia

    Energy Technology Data Exchange (ETDEWEB)

    Castillo Cordoba, Juan Jacobo; Romero Romero, Luis Carlos [Instituto de Ciencias Nucleares y Energias Alternativas - INEA, (Colombia)

    1997-12-31

    A communal photovoltaic minigrid grid system had been operating for about two years in La Venturosa Village located at the Easter Plains of Colombia. The Institute of Nuclear Sciences and Alternative Energies, INEA, had been evaluating this system for about a year of operation in order to measure performance, level of satisfaction in users and sustainability of the project. The results of this evaluation concluded that the option of communal minigrid photovoltaic systems represents a good alternative, but that the human element can affect the sustainability for this type of projects. [Espanol] Por alrededor de dos anos ha estado en operacion un sistema comunal fotovoltaico mini-red en la villa La Venturosa, localizada en las Llanuras Orientales de Colombia. El Instituto de Ciencias Nucleares y Energias Alternativas, INEA, ha estado evaluando este sistema durante aproximadamente un ano de operacion para medir su rendimiento, nivel de satisfaccion de los usuarios y sustentabilidad del proyecto. Los resultados de esta evaluacion concluyeron que la opcion de sistemas comunales fotovoltaicos mini-red representan una buena alternativa, pero que el elemento humano puede afectar la sostenibilidad de este tipo de proyectos.

  17. Evaluation of the PV minigrid communal system project in La Venturosa Colombia

    Energy Technology Data Exchange (ETDEWEB)

    Castillo Cordoba, Juan Jacobo; Romero Romero, Luis Carlos [Instituto de Ciencias Nucleares y Energias Alternativas - INEA, (Colombia)

    1998-12-31

    A communal photovoltaic minigrid grid system had been operating for about two years in La Venturosa Village located at the Easter Plains of Colombia. The Institute of Nuclear Sciences and Alternative Energies, INEA, had been evaluating this system for about a year of operation in order to measure performance, level of satisfaction in users and sustainability of the project. The results of this evaluation concluded that the option of communal minigrid photovoltaic systems represents a good alternative, but that the human element can affect the sustainability for this type of projects. [Espanol] Por alrededor de dos anos ha estado en operacion un sistema comunal fotovoltaico mini-red en la villa La Venturosa, localizada en las Llanuras Orientales de Colombia. El Instituto de Ciencias Nucleares y Energias Alternativas, INEA, ha estado evaluando este sistema durante aproximadamente un ano de operacion para medir su rendimiento, nivel de satisfaccion de los usuarios y sustentabilidad del proyecto. Los resultados de esta evaluacion concluyeron que la opcion de sistemas comunales fotovoltaicos mini-red representan una buena alternativa, pero que el elemento humano puede afectar la sostenibilidad de este tipo de proyectos.

  18. The DIALOGUE project: The right decision? A sociological evaluation of the project

    International Nuclear Information System (INIS)

    Sundqvist, G.

    1993-11-01

    The DIALOGUE project has been conducted by the Swedish Nuclear Power Inspectorate (SKI) since 1990. The aim of the project was to stimulate a dialogue between different interest groups within Sweden. The purpose of this dialogue was to establish a licensing process, prior to a future licensing of a repository for spent nuclear waste, in which several of the parties involved are reasonably confident. The DIALOGUE project was carried out with the participation of other government agencies, municipalities and environmental groups and was headed by the former chairman of the National Licensing Board for Environmental Protection

  19. The adolescent family life program: a multisite evaluation of federally funded projects serving pregnant and parenting adolescents.

    Science.gov (United States)

    Kan, Marni L; Ashley, Olivia Silber; LeTourneau, Kathryn L; Williams, Julia Cassie; Jones, Sarah B; Hampton, Joel; Scott, Alicia Richmond

    2012-10-01

    We evaluated the effectiveness of care demonstration projects supported by the Title XX Adolescent Family Life (AFL) program, which serves pregnant and parenting adolescents in an effort to mitigate the risks associated with adolescent childbearing. This cross-site evaluation involved 12 projects and 1038 adolescents who received either enhanced services funded by the AFL program or usual care. We examined the effects of enhanced services on health, educational, and child care outcomes approximately 6 months to 2 years after intake and explored moderation of program effects by time since intake and project characteristics associated with outcomes. The odds of using long-acting reversible contraception (odds ratio [OR] = 1.58) and receiving regular child care (OR = 1.50) in the past month were higher in the intervention group than in the comparison group. Odds of a repeat pregnancy were lower (OR = 0.39) among intervention group adolescents than among comparison group adolescents within 12 months of intake. Several project characteristics were associated with adolescent health outcomes. These projects show promise in improving effective contraceptive use, increasing routine child care, and yielding short-term decreases in repeat pregnancy.

  20. Bilingual Enrichment Services and Training (Project BEST): Community School District 2, Manhattan. Final Evaluation Report, 1992-93. OER Report.

    Science.gov (United States)

    Musante, Patricia

    This report presents an evaluation of Bilingual Enrichment Services and Training (Project BEST), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at four schools in Manhattan. The project served 266 Cantonese-, Fukienese, and Mandarin-speaking gifted students of limited English proficiency.…

  1. Evaluation of tile layer productivity in construction project

    Science.gov (United States)

    Aziz, Hamidi Abdul; Hassan, Siti Hafizan; Rosly, Noorsyalili; Ul-Saufie, Ahmad Zia

    2017-10-01

    Construction is a key sector of the national economy for countries all over the world. Until today, construction industries are still facing lots of problems concerning the low productivity, poor safety and insufficient quality. Labour productivity is one of the factors that will give impact to the quality of projects. This study is focusing on evaluating the tile layer productivity in the area of Seberang Perai, Penang. The objective of this study is to determine the relationship of age and experience of tile layers with their productivity and to evaluate the effect of nationality to tile layers productivity. Interview and site observation of tile layers has been conducted to obtain the data of age, experience and nationality of tile layers. Site observation is made to obtain the number of tiles installed for every tile layer for the duration of 1 hour, and the data were analysed by using Statistical Package for Social Science (IBM SPSS Statistic 23) software. As a result, there is a moderate linear relationship between age and experience of tile layers with their productivity. The age of 30 and the experience of 4 years give the highest productivity. It also can be concluded that the tile layers from Indonesia tend to have higher productivity compared to tile layers from Myanmar.

  2. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  3. Proposal and Evaluation of Management Method for College Mechatronics Education Applying the Project Management

    Science.gov (United States)

    Ando, Yoshinobu; Eguchi, Yuya; Mizukawa, Makoto

    In this research, we proposed and evaluated a management method of college mechatronics education. We applied the project management to college mechatronics education. We practiced our management method to the seminar “Microcomputer Seminar” for 3rd grade students who belong to Department of Electrical Engineering, Shibaura Institute of Technology. We succeeded in management of Microcomputer Seminar in 2006. We obtained the good evaluation for our management method by means of questionnaire.

  4. Methodological approach for evaluating the geo-exchange potential: VIGOR Project

    Directory of Open Access Journals (Sweden)

    Antonio Galgaro

    2012-12-01

    Full Text Available In the framework of VIGOR Project, a national project coordinated by the Institute of Geosciences and Earth Resources (CNR-IGG and sponsored by the Ministry of Economic Development (MiSE, dedicated to the evaluation of geothermal potential in the regions of the Convergence Objective in Italy (Puglia, Calabria, Campania and Sicily, is expected to evaluate the ability of the territory to heat exchange with the ground for air conditioning of buildings. To identify the conditions for the development of low enthalpy geothermal systems collected and organized on a regional scale geological and stratigraphic data useful for the preparation of a specific thematic mapping, able to represent in a synergistic and simplified way the physical parameters (geological, lithostratigraphic, hydrogeological, thermodynamic that most influence the subsoil behavior for thermal exchange. The litho-stratigraphic and hydrogeological database created for every region led to the production of different cartographic thematic maps, such as the thermal conductivity (lithological and stratigraphical, the surface geothermal flux, the average annual temperature of air, the climate zoning, the areas of hydrogeological restrictions. To obtain a single representation of the geo-exchange potential of the region, the different thematic maps described must be combined together by means of an algorithm, defined on the basis of the SINTACS methodology. The purpose is to weigh the contributions of the involved parameters and to produce a preliminary synthesis map able to identify the territorial use of geothermal heat pump systems, based on the geological characteristics and in agreement with the existing regulatory constraints.

  5. Arizona Head Start for Homeless Children and Families Project. 1994-95 Evaluation Report.

    Science.gov (United States)

    Mulholland, Lori; Greene, Andrea

    Homeless families with children comprise the fastest growing segment of the United States homeless population. This study evaluated Year 1 of the Arizona Head Start for Homeless Children and Families Project, designed to meet educational and social needs of homeless children and families, and to assist Head Start agencies in developing effective…

  6. Arizona Head Start for Homeless Children and Families Project. 1995-96 Evaluation Report.

    Science.gov (United States)

    Mulholland, Lori

    Homeless families with children constitute the fastest growing segment of the United States homeless population. This study evaluated Year 2 of the Arizona Head Start for Homeless Children and Families Project, designed to meet educational and social needs of homeless children and families, and to assist Head Start agencies in developing effective…

  7. Proposal of a model for evaluation of research and development projects in a public scientific and technological institution: a survey in CNEN

    International Nuclear Information System (INIS)

    Silva, Eduardo de Assumpcao

    2017-01-01

    Science and technology are directly related to the development of a country. The research and development projects in CNEN are financed by the direct resources of the budget of the Union and of the Development Agencies such as FINEP and CNPq. In general, project managers believe they can succeed when they complete a project on schedule, budget, and anticipated requirements, which is commonly known as a 'triple constraint' or 'iron triangle'. However, in the review of the literature, other criteria for evaluating success in projects, such as the benefits generated by society, the development of the team's capabilities, future opportunities, new technologies, among others, were verified. In this way, in order to assist the manager in the evaluation of this type of project, the present research carried out a review in the literature aiming to find concepts about success in projects and their evaluation criteria, proposed a model based on the theoretical reference and Importance and use of these criteria with the CNEN specialists, who work directly in the R and D projects of a public ICT in the nuclear area. The results showed that the criteria proposed in the model have a high degree of importance and show a decrease in the degree of utilization, suggesting that the criteria used in the model can help managers in the evaluation of these projects. (author)

  8. Comprehensive Sustainability Evaluation of High-Speed Railway (HSR Construction Projects Based on Unascertained Measure and Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Yongzhi Chang

    2018-02-01

    Full Text Available This paper aims to evaluate the sustainability of high-speed railway (HSR construction projects in a comprehensive manner. To this end, the author established an index system, involving 4 primary indices, 9 secondary indices, and 32 tertiary indices. The analytic hierarchy process (AHP and the unascertained measure were introduced to calculate the weights of these indices. Then, the index system was applied to evaluate the sustainability of the China’s Harbin-Dalian Passenger Dedicated Line (PDL. The results show that the Harbin-Dalian PDL project achieved good results in terms of process, economic benefit, impact, and sustainability, and will bring long-term benefits in the fields of tourism, economy, and transport capacity, as well as many other fields. In spite of its good overall sustainability, the project needs to further increase its economic benefits and reduce its negative environmental impact. For this purpose, it is necessary to adopt the management mode of “separation between network and transportation” and apply noise prevention measures like noise barriers, tunnels, and overhead viaducts. This research lays a solid basis for the sustainability evaluation of HSR construction projects, and simplifies the modelling process for designers of HSR.

  9. The process evaluation of It's Your Move!, an Australian adolescent community-based obesity prevention project

    Directory of Open Access Journals (Sweden)

    Simmons Annie M

    2010-07-01

    Full Text Available Abstract Background Evidence on interventions for preventing unhealthy weight gain in adolescents is urgently needed. The aim of this paper is to describe the process evaluation for a three-year (2005-2008 project conducted in five secondary schools in the East Geelong/Bellarine region of Victoria, Australia. The project, 'It's Your Move!' aimed to reduce unhealthy weight gain by promoting healthy eating patterns, regular physical activity, healthy body weight, and body size perception amongst youth; and improve the capacity of families, schools, and community organisations to sustain the promotion of healthy eating and physical activity in the region. Methods The project was supported by Deakin University (training and evaluation, a Reference Committee (strategic direction, budgetary approval and monitoring and a Project Management Committee (project delivery. A workshop of students, teachers and other stakeholders formulated a 10-point action plan, which was then translated into strategies and initiatives specific to each school by the School Project Officers (staff members released from teaching duties one day per week and trained Student Ambassadors. Baseline surveys informed intervention development. Process data were collected on all intervention activities and these were collated and enumerated, where possible, into a set of mutually exclusive tables to demonstrate the types of strategies and the dose, frequency and reach of intervention activities. Results The action plan included three guiding objectives, four on nutrition, two on physical activity and one on body image. The process evaluation data showed that a mix of intervention strategies were implemented, including social marketing, one-off events, lunch time and curriculum programs, improvements in infrastructure, and healthy school food policies. The majority of the interventions were implemented in schools and focused on capacity building and healthy eating strategies as

  10. The process evaluation of It's Your Move!, an Australian adolescent community-based obesity prevention project.

    Science.gov (United States)

    Mathews, Louise B; Moodie, Marj M; Simmons, Annie M; Swinburn, Boyd A

    2010-07-30

    Evidence on interventions for preventing unhealthy weight gain in adolescents is urgently needed. The aim of this paper is to describe the process evaluation for a three-year (2005-2008) project conducted in five secondary schools in the East Geelong/Bellarine region of Victoria, Australia. The project, 'It's Your Move!' aimed to reduce unhealthy weight gain by promoting healthy eating patterns, regular physical activity, healthy body weight, and body size perception amongst youth; and improve the capacity of families, schools, and community organisations to sustain the promotion of healthy eating and physical activity in the region. The project was supported by Deakin University (training and evaluation), a Reference Committee (strategic direction, budgetary approval and monitoring) and a Project Management Committee (project delivery). A workshop of students, teachers and other stakeholders formulated a 10-point action plan, which was then translated into strategies and initiatives specific to each school by the School Project Officers (staff members released from teaching duties one day per week) and trained Student Ambassadors. Baseline surveys informed intervention development. Process data were collected on all intervention activities and these were collated and enumerated, where possible, into a set of mutually exclusive tables to demonstrate the types of strategies and the dose, frequency and reach of intervention activities. The action plan included three guiding objectives, four on nutrition, two on physical activity and one on body image. The process evaluation data showed that a mix of intervention strategies were implemented, including social marketing, one-off events, lunch time and curriculum programs, improvements in infrastructure, and healthy school food policies. The majority of the interventions were implemented in schools and focused on capacity building and healthy eating strategies as physical activity practices were seen by the teachers as

  11. To Green or Not to Green? Evaluation of Green Stormwater Infrastructure in Kansas City Middle Blue River Project

    Science.gov (United States)

    The City of Kansas City, Mo., Water Services Department is implementing a pilot project to measure and evaluate the performance of green infrastructure. Information obtained through this pilot project will be used to guide the design of green solutions throughout Kansas City und...

  12. ARSENIC REMOVAL FROM DRINKING WATER BY ADSORPTIVE MEDIA, USEPA DEMONSTRATION PROJECT AT RIMROCK, AZ, SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed during and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at Rimrock, AZ. The objectives of the project are to evaluate the effectiveness of AdEdge Arsenic Package Uni...

  13. Use of the Theoretical Domains Framework to evaluate factors driving successful implementation of the Accelerated Chest pain Risk Evaluation (ACRE) project.

    Science.gov (United States)

    Skoien, Wade; Page, Katie; Parsonage, William; Ashover, Sarah; Milburn, Tanya; Cullen, Louise

    2016-10-12

    The translation of healthcare research into practice is typically challenging and limited in effectiveness. The Theoretical Domains Framework (TDF) identifies 12 domains of behaviour determinants which can be used to understand the principles of behavioural change, a key factor influencing implementation. The Accelerated Chest pain Risk Evaluation (ACRE) project has successfully translated research into practice, by implementing an intervention to improve the assessment of low to intermediate risk patients presenting to emergency departments (EDs) with chest pain. The aims of this paper are to describe use of the TDF to determine which factors successfully influenced implementation and to describe use of the TDF as a tool to evaluate implementation efforts and which domains are most relevant to successful implementation. A 30-item questionnaire targeting clinicians was developed using the TDF as a guide. Questions encompassed ten of the domains of the TDF: Knowledge; Skills; Social/professional role and identity; Beliefs about capabilities; Optimism; Beliefs about consequences; Intentions; Memory, attention and decision processes; Environmental context and resources; and Social influences. Sixty-three of 176 stakeholders (36 %) responded to the questionnaire. Responses for all scales showed that respondents were highly favourable to all aspects of the implementation. Scales with the highest mean responses were Intentions, Knowledge, and Optimism, suggesting that initial education and awareness strategies around the ACRE project were effective. Scales with the lowest mean responses were Environmental context and resources, and Social influences, perhaps highlighting that implementation planning could have benefitted from further consideration of the factors underlying these scales. The ACRE project was successful, and therefore, a perfect case study for understanding factors which drive implementation success. The overwhelmingly positive response suggests that it

  14. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  15. Development project for a residual life evaluation system in LWR NPPs

    International Nuclear Information System (INIS)

    Hervia, F.; Francia, L.

    1995-01-01

    Economic and safety factors have stimulated the interest of Spanish NPPs towards the optimisation of NPP Residual Life Management, and consequently the need to have access to tools to support such management. This requirement has been the subject of a project, the main objectives of which are the identification of the most significant ageing factors in NPPs and their corresponding parameters, and the development of an associated integrated monitoring system. Work on the project was started by UNESA in September 1992 and is partly financed from PIE funds. This paper gives a general description of the objectives and activities of Phase 1, the Definition of the Core Project, which is nearing completion, and Phase 2, the Application of the Integrated System in a Pilot Plant. Phase 1 has confirmed the technical feasibility of the system and its suitability as a tool for the continuous evaluation of the plant condition. Furthermore, it has raised issues of great interest to NPPs. The results and conclusions of Phase 1 are currently being used to define the most suitable scope for the development and implementation of the system in the pilot plant (Phase 2), so that all the main functions of the system are tested without incurring unnecessary costs

  16. Toward a Framework for Resource Efficiency Evaluation in Industry: Recommendations for Research and Innovation Projects

    Directory of Open Access Journals (Sweden)

    Sophie Sfez

    2017-01-01

    Full Text Available The world is facing a tremendous resource supply challenge. One strategy of regions and nations to address this issue is to encourage research and innovation through funding programs. Most of the time, these programs require that research and innovation projects quantify potential increases in resource efficiency achieved by the projects. However, no consensus exists on how to calculate resource efficiency; therefore, a wide range of approaches is followed. As a result, resource efficiency results are not comparable between projects, and because no rules or guidelines exist to help project developers, the approach followed is not always appropriate. This paper aims to discuss the existing approaches and methods used to evaluate resource efficiency. In this context, resource efficiency is defined as the ratio between the benefits obtained from resources and the impact or amount of resources used. The most challenging step is the determination of this ratio’s denominator because a wide range of methods to quantify resource consumption exist and are being used. They can be classified as gate-to-gate or life cycle based methods and can be subdivided into accounting methods and impact assessment methods. Each method considers different aspects of resources; thus, no single method aims to answer the same research questions. Therefore, project developers must make a well informed choice about which method to use. This paper provides recommendations to support this choice, as well as the overall evaluation and the valorization of the resource efficiency ratio in the framework of research and innovation programs.

  17. Evaluation of economic rent of hydropower projects

    International Nuclear Information System (INIS)

    Shrestha, Ram M.; Abeygunawardana, A.M.A.K.

    2009-01-01

    Existing studies have mostly estimated the ex post economic rent of hydropower for the hydroelectric system of a province or a country as a whole and have ignored the site- or project-specific variations in the economic rent of hydropower plants. Further, most of the existing studies have used simplified methods to calculate the rent ex post. This paper presents a rigorous methodology for estimation of site-specific (i.e., project specific) economic rent of hydropower ex ante. It applies the methodology in the case of a hydropower project and analyzes the sensitivity of the rent to variations in some key parameters.

  18. ARSENIC REMOVAL FROM DRINKING WATER BY IRON REMOVAL. USEPA DEMONSTRATION PROJECT AT CLIMAX, MN SIX-MONTH EVALUATION REPORT

    Science.gov (United States)

    This report documents the activities performed and the results obtained from the first six months of the arsenic removal treatment technology demonstration project at the Climax, MN site. The objectives of the project are to evaluate (1) the effectiveness of Kinetico’s Macrolite®...

  19. Preliminary safety evaluation for 241-C-106 waste retrieval, project W-320

    International Nuclear Information System (INIS)

    Conner, J.C.

    1994-01-01

    This document presents the Preliminary Safety Evaluation for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). The US DOE has been mandated to develop plans for response to safety issues associated with the waste storage tanks at the Hanford Site, and to report the progress of implementing those plans to Congress. The objectives of Project W-230 are to design, fabricate, develop, test, and operate a new retrieval system capable of removing a minimum of about 75% of the high-heat waste contained in C-106. It is anticipated that sluicing operations can remove enough waste to reduce the remaining radiogenic heat load to levels low enough to resolve the high-heat safety issue as well as allow closure of the tank safety issue

  20. Outcome mapping as methodology to monitor and evaluate community informatics projects: A case study

    CSIR Research Space (South Africa)

    Herselman, M

    2010-10-01

    Full Text Available The purpose of this paper is to indicate how Outcome Mapping (OM) can be used as a methodology to monitor and evaluate a specific developmental informatics project currently under way in the Meraka Institute. OM was applied in the Broadband for All...

  1. Introduction to the Special Collection of Papers on the San Luis Basin Sustainability Metrics Project: A Methodology for Evaluating Regional Sustainability

    Science.gov (United States)

    This paper introduces a collection of four articles describing the San Luis Basin Sustainability Metrics Project. The Project developed a methodology for evaluating regional sustainability. This introduction provides the necessary background information for the project, descripti...

  2. Application of life cycle assessment for an evaluation of wastewater treatment and reuse project--case study of Xi'an, China.

    Science.gov (United States)

    Zhang, Q H; Wang, X C; Xiong, J Q; Chen, R; Cao, B

    2010-03-01

    In order to illuminate the benefit of a wastewater treatment and reuse project, a life cycle assessment (LCA) model was proposed by combining the process-based LCA and the input-output based LCA in one framework and using energy consumption as the sole parameter for quantitative evaluation of the project. The life cycle consumption was evaluated mainly by life cycle inventory (LCI) analysis taking into account the construction phase, operation phase and demolishment phase of the project. For evaluating the life cycle benefit of treated water reuse, attention was paid to the decrease of secondary effluent discharge and water saving. As a result of comprehensive LCA analysis of a case project in Xi'an, China, it was understood that the life cycle benefit gained from treated wastewater reuse much surpassed the life cycle energy consumption. The advantage of wastewater treatment and reuse was well shown by LCA analysis using the proposed model. 2009 Elsevier Ltd. All rights reserved.

  3. Evaluation of the WIPP Project`s compliance with the EPA radiation protection standards for disposal of transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M. [Environmental Evaluation Group, Albuquerque, NM (United States)]|[Environmental Evaluation Group, Carlsbad, NM (United States)

    1998-03-01

    The US Environmental Protection Agency`s (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP`s compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy`s (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA`s proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA`s responses to EEG`s comments.

  4. The Okapi Projects.

    Science.gov (United States)

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  5. Evaluation of Health Equity Impact of Structural Policies: Overview of Research Methods Used in the SOPHIE Project

    NARCIS (Netherlands)

    Kunst, Anton E.

    2017-01-01

    This article briefly assesses the research methods that were applied in the SOPHIE project to evaluate the impact of structural policies on population health and health inequalities. The evaluation of structural policies is one of the key methodological challenges in today's public health. The

  6. Strategical integration and prior evaluation of science and innovation projects in Ecuadorians sports organizations.

    Directory of Open Access Journals (Sweden)

    Gloria Barroso Rodríguez

    2015-09-01

    Full Text Available This work shows the design of a procedure for evaluating the strategical integration of science and innovation projects level in the physical and sport sphere, and its validation through expert criteria for application to Ecuadorian sports organizations. As a result, it was possible to demonstrate the validity of the procedure designed, so it will be possible to be used to facilitate decision-making in relation to the execution of such projects considering, as a value judgment, the level of their essential components integration for the achievement of objectives aligned to the strategic priorities of the Ecuadorians sports organizations.  

  7. Project CHAMP, 1985-1986. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    The Chinese Achievement and Mastery program, Project CHAMP, was a bilingual (Chinese/English) project offered at three high schools in Manhattan. The major goals were to enable Chinese students of limited English proficiency (LEP) to learn English and to master content in mathematics, science, global history, computer mathematics, and native…

  8. Project PROBE, 1985-1986. OEA Evaluation Report.

    Science.gov (United States)

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In its second year of operation, Project PROBE (Professions Oriented Bilingual Education) experienced difficulty in meeting some of its instructional objectives. The project had sought to provide instructional and supportive services to 200 Spanish-speaking students from Latin America at Louis D. Brandeis High School (Manhattan, New York) and to…

  9. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  10. Nozzle evaluation for Project W-314

    International Nuclear Information System (INIS)

    Galbraith, J.D.

    1998-01-01

    Revisions to the waste transfer system piping to be implemented by Project W-314 will eliminate the need to access a majority of interfarm jumper connections associated with specific process pits. Additionally, connections that formerly facilitated waste transfers from the Plutonium-Uranium Extraction (PUREX) Plant are no longer required. This document identified unneeded process pit jumper connections, describes former designated routing, denotes current status (i.e., open or blanked), and recommends appropriate disposition for all. Blanking of identified nozzles should be accomplished by Project W-314 upon installation of jumpers and acceptance by Tank Waste Remediation System (TWRS) Tank Farm Operations

  11. Problems with Reporting and Evaluating Mining Industry Community Development Projects: A Case Study from Tanzania

    Directory of Open Access Journals (Sweden)

    Esther Wangari

    2012-02-01

    Full Text Available Reporting on contributions to community development is one way gold mining companies communicate the expanse and depth of their commitment to social responsibility. These projects are intended to provide the mine-proximate communities with some of the wealth and other benefits generated by mine development in their locales. We raise questions about reporting and evaluation of community development projects undertaken by AngloGold Ashanti in the two communities of Nyakabale and Nyamalembo, near its Geita mining projects in the Lake Victoria goldfields of Tanzania. We use archival data and data obtained from field research conducted during different periods throughout 2005, 2007 and 2010 to compare what the company reports to have done with what is found on the ground. Our findings revealed that the corporate reporting is misleading, ambiguous, and omissive. Much of the effort labeled “community development” benefited the companies directly via infrastructure development, food supplies to the mine cafeteria, and worker health. We argue that, if Corporate Social Responsibility (CSR projects are to be the primary way local people directly benefit from mine development, the relationship between the value of those projects and the wealth taken from the location should be considered, community projects should be well defined and differentiated from company-oriented projects, and community representatives should participate in monitoring the success and impact of community development projects.

  12. A Novel Markerless Technique to Evaluate Daily Lung Tumor Motion Based on Conventional Cone-Beam CT Projection Data

    International Nuclear Information System (INIS)

    Yang Yin; Zhong Zichun; Guo Xiaohu; Wang Jing; Anderson, John; Solberg, Timothy; Mao Weihua

    2012-01-01

    Purpose: In this study, we present a novel markerless technique, based on cone beam computed tomography (CBCT) raw projection data, to evaluate lung tumor daily motion. Method and Materials: The markerless technique, which uses raw CBCT projection data and locates tumors directly on every projection, consists of three steps. First, the tumor contour on the planning CT is used to create digitally reconstructed radiographs (DRRs) at every projection angle. Two sets of DRRs are created: one showing only the tumor, and another with the complete anatomy without the tumor. Second, a rigid two-dimensional image registration is performed to register the DRR set without the tumor to the CBCT projections. After the registration, the projections are subtracted from the DRRs, resulting in a projection dataset containing primarily tumor. Finally, a second registration is performed between the subtracted projection and tumor-only DRR. The methodology was evaluated using a chest phantom containing a moving tumor, and retrospectively in 4 lung cancer patients treated by stereotactic body radiation therapy. Tumors detected on projection images were compared with those from three-dimensional (3D) and four-dimensional (4D) CBCT reconstruction results. Results: Results in both static and moving phantoms demonstrate that the accuracy is within 1 mm. The subsequent application to 22 sets of CBCT scan raw projection data of 4 lung cancer patients includes about 11,000 projections, with the detected tumor locations consistent with 3D and 4D CBCT reconstruction results. This technique reveals detailed lung tumor motion and provides additional information than conventional 4D images. Conclusion: This technique is capable of accurately characterizing lung tumor motion on a daily basis based on a conventional CBCT scan. It provides daily verification of the tumor motion to ensure that these motions are within prior estimation and covered by the treatment planning volume.

  13. MEOR (microbial enhanced oil recovery) data base and evaluation of reservoir characteristics for MEOR projects

    Energy Technology Data Exchange (ETDEWEB)

    Bryant, R.S.

    1989-09-01

    One aspect of NIPER's microbial enhanced oil recovery (MEOR) research program has been focused on obtaining all available information regarding the use of microorganisms in enhanced oil recovery field projects. The data have been evaluated in order to construct a data base of MEOR field projects. The data base has been used in this report to present a list of revised reservoir screening criteria for MEOR field processes. This list is by no means complete; however, until more information is available from ongoing field tests, it represents the best available data to date. The data base has been studied in this report in order to determine any significant reports from MEOR field projects where the microbial treatment was unsuccessful. Such information could indicate limitations of MEOR processes. The types of reservoir information sought from these projects that could be limitations of microorganisms include reservoir permeability, salinity, temperature, and high concentrations of minerals in the rock such as selenium, arsenic, or mercury. Unfortunately, most of the MEOR field projects to date have not reported this type of information; thus we still cannot assess field limitations until more projects report these data. 7 refs., 1 fig., 7 tabs.

  14. Methodology for economic evaluation of software development projects

    International Nuclear Information System (INIS)

    Witte, D.M.

    1990-01-01

    Many oil and gas exploration and production companies develop computer software in-house or with contract programmers to support their exploration activities. Software development projects compete for funding with exploration and development projects, though most companies lack valid comparison measures for the two types of projects. This paper presents a methodology of pro form a cash flow analysis for software development proposals intended for internal use. This methodology, based on estimates of development and support costs, exploration benefits, and probability of successful development and implementation, can be used to compare proposed software development projects directly with competing exploration proposals

  15. Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.; Roegner, G. C.; Whiting, Allan H.; Johnson, Gary E.; Dawley, Earl; Skalski, John R.; Vavrinec, John; Ebberts, Blaine D.

    2006-12-20

    This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that may play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.

  16. [Logic model of the Franche-Comté Regional Health Project: advantages and limitations for the evaluation process].

    Science.gov (United States)

    Michaud, Claude; Sannino, Nadine; Duboudin, Cédric; Baudier, François; Guillin, Caroline; Billondeau, Christine; Mansion, Sylvie

    2014-01-01

    The French "Hospitals, patients, health and territories" law of July 2009 created the Regional Health Project (PRS) to support regional health policy, and requires evaluation of these projects. The construction of these projects, which includes prevention planning, care planning, and medical and social welfare planning, presents an unprecedented complexity in France, where evaluation programmes are still in their infancy. To support future evaluations, the Franche-Comté Regional Health Agency (ARS FC), assisted by the expertise of EFECT Consultants, decided to reconstruct the PRS logic model. This article analyzes the advantages and limitations of this approach. The resulting logic model allows visualization of the strategy adopted to achieve the Franche-Comté PRS ambitions and expected results. The model highlights four main aspects of structural change to the health system, often poorly visible in PRS presentation documents. This model also establishes links with the usual public policy evaluation issues and facilitates their prioritization. This approach also provides a better understanding of the importance of analysis of the programme construction in order to be effective rather than direct analysis of the effects, which constitutes the natural tendency of current practice. The main controversial limit concerns the retrospective design of the PRS framework, both in terms of the reliability of interpretation and adoption by actors not directly involved in this initiative.

  17. VIRTUAL ANTI-BULLYING VILLAGE PROJECT FOR COPING WITH BULLYING AND CYBERBULLYING WITHIN A 3D VIRTUAL LEARNING ENVIRONMENT: EVALUATION RESEARCH

    Directory of Open Access Journals (Sweden)

    Dorit Olenik Shemesh

    2014-12-01

    Full Text Available The current study aims to evaluate the implementation of a unique educational project- The Virtual Anti-Bullying Village for Kids and Teens (ABV4KIDS that was designed and operated by the European Commission. A 3D virtual environment as an innovative, international project for adolescents, focused on knowledge acquisition and new ways of coping with bullying and cyberbullying. Sixty seventh graders-Israeli adolescents-completed five questionnaires before and after the project to assess its impacts regarding cyberbullying and socio-emotional variables. They evaluated the project as important, enjoyable, and increasing their knowledge about cyberbullying, but expressed a need for more practical tools for coping. At the end of the project, the control group reported more cyberbullying experiences, as well as a decrease in social support, whereas the research group reported no changes in cyberbullying experiences and in socio-emotional aspects.

  18. An Evaluation of Project iRead: A Program Created to Improve Sight Word Recognition

    Science.gov (United States)

    Marshall, Theresa Meade

    2014-01-01

    This program evaluation was undertaken to examine the relationship between participation in Project iRead and student gains in word recognition, fluency, and comprehension as measured by the Phonological Awareness Literacy Screening (PALS) Test. Linear regressions compared the 2012-13 PALS results from 5,140 first and second grade students at…

  19. Formation and Assessment of a Tool to Evaluate STEM Literacy in Service-Learning Projects

    Science.gov (United States)

    Hayford, Barbara; Blomstrom, Sally; Mumpower, Lori

    2015-01-01

    The purpose of the authors' research was to create a tool to evaluate science, technology, engineering, and mathematics (STEM) literacy in service-learning projects. The researchers posited that components of service-learning, which in this case included the deliverable and reflections, are examples of fundamental STEM literacy and thus can be…

  20. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined