WorldWideScience

Sample records for estimating project overheads

  1. Overhead remote handling systems for the process facility modifications project

    International Nuclear Information System (INIS)

    Wiesener, R.W.; Grover, D.L.

    1987-01-01

    Each of the cells in the process facility modifications (PFM) project complex is provided with a variety of general purpose remote handling equipment including bridge cranes, monorail hoist, bridge-mounted electromechanical manipulator (EMM) and an overhead robot used for high efficiency particulate air (HEPA) filter changeout. This equipment supplements master-slave manipulators (MSMs) located throughout the complex to provide an overall remote handling system capability. The overhead handling equipment is used for fuel and waste material handling operations throughout the process cells. The system also provides the capability for remote replacement of all in-cell process equipment which may fail or be replaced for upgrading during the lifetime of the facility

  2. Spectral and Energy Efficient Low-Overhead Uplink and Downlink Channel Estimation for 5G Massive MIMO Systems

    Directory of Open Access Journals (Sweden)

    Imran Khan

    2018-01-01

    Full Text Available Uplink and Downlink channel estimation in massive Multiple Input Multiple Output (MIMO systems is an intricate issue because of the increasing channel matrix dimensions. The channel feedback overhead using traditional codebook schemes is very large, which consumes more bandwidth and decreases the overall system efficiency. The purpose of this paper is to decrease the channel estimation overhead by taking the advantage of sparse attributes and also to optimize the Energy Efficiency (EE of the system. To cope with this issue, we propose a novel approach by using Compressed-Sensing (CS, Block Iterative-Support-Detection (Block-ISD, Angle-of-Departure (AoD and Structured Compressive Sampling Matching Pursuit (S-CoSaMP algorithms to reduce the channel estimation overhead and compare them with the traditional algorithms. The CS uses temporal-correlation of time-varying channels to produce Differential-Channel Impulse Response (DCIR among two CIRs that are adjacent in time-slots. DCIR has greater sparsity than the conventional CIRs as it can be easily compressed. The Block-ISD uses spatial-correlation of the channels to obtain the block-sparsity which results in lower pilot-overhead. AoD quantizes the channels whose path-AoDs variation is slower than path-gains and such information is utilized for reducing the overhead. S-CoSaMP deploys structured-sparsity to obtain reliable Channel-State-Information (CSI. MATLAB simulation results show that the proposed CS based algorithms reduce the feedback and pilot-overhead by a significant percentage and also improve the system capacity as compared with the traditional algorithms. Moreover, the EE level increases with increasing Base Station (BS density, UE density and lowering hardware impairments level.

  3. Composite Based EHV AC Overhead Transmission Lines

    DEFF Research Database (Denmark)

    Sørensen, Thomas Kjærsgaard

    and analysed with regard to the possibilities, limitations and risks widespread application of composite materials on EHV AC overhead transmission lines may present. To form the basis for evaluation of the useability of composite materials, dierent overhead line projects aimed at reducing the environmental...

  4. Overhead-Aware-Best-Fit (OABF) Resource Allocation Algorithm for Minimizing VM Launching Overhead

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Hao [IIT; Garzoglio, Gabriele [Fermilab; Ren, Shangping [IIT, Chicago; Timm, Steven [Fermilab; Noh, Seo Young [KISTI, Daejeon

    2014-11-11

    FermiCloud is a private cloud developed in Fermi National Accelerator Laboratory to provide elastic and on-demand resources for different scientific research experiments. The design goal of the FermiCloud is to automatically allocate resources for different scientific applications so that the QoS required by these applications is met and the operational cost of the FermiCloud is minimized. Our earlier research shows that VM launching overhead has large variations. If such variations are not taken into consideration when making resource allocation decisions, it may lead to poor performance and resource waste. In this paper, we show how we may use an VM launching overhead reference model to minimize VM launching overhead. In particular, we first present a training algorithm that automatically tunes a given refer- ence model to accurately reflect FermiCloud environment. Based on the tuned reference model for virtual machine launching overhead, we develop an overhead-aware-best-fit resource allocation algorithm that decides where and when to allocate resources so that the average virtual machine launching overhead is minimized. The experimental results indicate that the developed overhead-aware-best-fit resource allocation algorithm can significantly improved the VM launching time when large number of VMs are simultaneously launched.

  5. Design Of Overhead Roadway At Road Intersection

    Directory of Open Access Journals (Sweden)

    Raji

    2017-08-01

    Full Text Available This project deals with the Design of overhead-roadway located at CHALLENGE junction which is a T-junction. Analysis of the existing conditions was carried out to proffers solution to the cause of the problems occurring due to the vehicle competing for space at this intersection. Before carrying out the analysis a traffic surveys at peak hours for morning 0730 to 0830 am and afternoon 0300 to 0400 pm were conducted using 15 minutes interval. From the analysis it was found out that the peak hour factor and flow rate was 0.88 and 1656pcphpl respectively corresponding to LOS E. This implies that the capacity of the existing road is no longer able to accommodate the traffic flow hence overhead roadway was introduced to improve the efficiency of the intersection. The overhead-roadway is of 140 m length with 7 spans 20 m per span. It consists of a deck slab longitudinal girders cross girders deck beam pier foundation and retailing wall. All structural parts for this Flyover were designed using Staad professional software package and Manual method.

  6. Vibrational methods of the overhead gas-pipelines technological equipment diagnostics

    International Nuclear Information System (INIS)

    Zakhezin, A.M.; Malysheva, T.V.

    2001-01-01

    The diagnostic methods of overhead gas-pipelines of the technical equipment of gas-compressor station are considered in this article by carrying out registration certification documentation. Some faults of overhead technical gas-pipelines have been proposed. This paper is devoted to the diagnostic methods of the whole gas- pipelines and their parts for some faults during expert checking fulfillment and carrying out registration certification documentation. The analysis of all defects allows to determine a 'between-repairs interval', to develop some operations to avoid these faults and to estimate the repair operation quality, to reduce failure probability. As an example of the effectiveness of technical condition service of vibrational methods by expertise fulfillment have been considered for some defects of the overhead pipelines. (author)

  7. Overhead Crane Computer Model

    Science.gov (United States)

    Enin, S. S.; Omelchenko, E. Y.; Fomin, N. V.; Beliy, A. V.

    2018-03-01

    The paper has a description of a computer model of an overhead crane system. The designed overhead crane system consists of hoisting, trolley and crane mechanisms as well as a payload two-axis system. With the help of the differential equation of specified mechanisms movement derived through Lagrange equation of the II kind, it is possible to build an overhead crane computer model. The computer model was obtained using Matlab software. Transients of coordinate, linear speed and motor torque of trolley and crane mechanism systems were simulated. In addition, transients of payload swaying were obtained with respect to the vertical axis. A trajectory of the trolley mechanism with simultaneous operation with the crane mechanism is represented in the paper as well as a two-axis trajectory of payload. The designed computer model of an overhead crane is a great means for studying positioning control and anti-sway control systems.

  8. An ABC analysis for power generation project

    Directory of Open Access Journals (Sweden)

    Batool Hasani

    2013-07-01

    Full Text Available One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.

  9. The fallacy of the overhead quick fix.

    Science.gov (United States)

    Blaxill, M F; Hout, T M

    1991-01-01

    Facing pressure from a few large, low-cost competitors, Thornton, an old-guard specialty-equipment manufacturer, fought back by eliminating overhead. Over two-years, it outsourced components and consolidated operations. But instead of cutting overhead, it added more and became still more uncompetitive. Thornton is not alone in either its predicament or its failed reaction. Many large manufacturing companies are finding themselves at a cost disadvantage in markets they have dominated for years. One reason is excessive overhead structures, the result of an unchecked buildup of indirect employees needed to control rising organizational complexity. Another reason is the emergence of the "robust" competitor, comparable in size and product scope but able to produce at a lower unit overhead cost. Data collected from more than 100 manufacturing plants worldwide illustrate the differences between overhead cost structures of bureaucratic, niche, and robust companies. The gulf between these groups highlights the need for action by bureaucratic companies, and, in some cases, by niche companies. But high-overhead companies are doomed if they cut overhead out of the system either by outsourcing or downsizing. If they expect to retain their size and also become more cost competitive, they must rethink their manufacturing systems. Well-designed and well-controlled processes mean higher product quality, faster cycle time, improved flexibility, and lower overhead costs. Sustainable overhead reduction means a commitment to continuous improvement. This includes segmenting, mapping, and measuring existing processes and then working to improve them.(ABSTRACT TRUNCATED AT 250 WORDS)

  10. Actual practical considerations about overhead line engineering. Planning of overhead lines is booming; Aktuelle praktische Betrachtung der Freileitungstechnik. Freileitungsplanung boomt

    Energy Technology Data Exchange (ETDEWEB)

    Bueckner, W.F.

    2007-04-30

    The power breakdowns we encountered in March 2006 due to extreme weather conditions and in November 2006 due to overload of overhead lines made overhead line techniques more interesting. After pausing for decades, technical development and investments for overhead lines in Germany become necessary again, meaning reconstructions and new constructions worth several millions of investment. An additional reason for this is given by the Federal Government's request for the construction of new power plants and overhead lines as well as by the energy plan of the EU-Commission. The power supplier have begun planning already. These plans require new and economical overhead lines. Proposals and practical examples are shown in the following article.

  11. Wood pole overhead lines

    CERN Document Server

    Wareing, Brian

    2005-01-01

    This new book concentrates on the mechanical aspects of distribution wood pole lines, including live line working, environmental influences, climate change and international standards. Other topics include statutory requirements, safety, profiling, traditional and probabilistic design, weather loads, bare and covered conductors, different types of overhead systems, conductor choice, construction and maintenance. A section has also been devoted to the topic of lightning, which is one of the major sources of faults on overhead lines. The book focuses on the effects of this problem and the strate

  12. 30 CFR 56.16014 - Operator-carrying overhead cranes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 56.16014 Section 56.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 56.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  13. 30 CFR 57.16014 - Operator-carrying overhead cranes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operator-carrying overhead cranes. 57.16014 Section 57.16014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Storage and Handling § 57.16014 Operator-carrying overhead cranes. Operator-carrying overhead cranes shall...

  14. Composite Materials in Overhead Lines

    DEFF Research Database (Denmark)

    Sørensen, Thomas Kjærsgaard; Holbøll, Joachim

    2009-01-01

    towers and recently conductors based on composite materials are available at transmission levels. In this paper it is investigated which composite based solutions are available in connection with complete overhead line systems including insulators, towers and conductors. The components are reviewed......The use of composite materials, e.g. fibreglass materials, in overhead transmission line systems is nothing new. Composite based insulators have been applied to transmission lines for over 30 years, mainly as suspension and post insulators and often as an option for special applications. Also...... with respect to solved and persisting known failures/problems of both mechanical and electrical nature. Major challenges related to extensive use of composite materials in an overhead line system are identified, as are possible benefits - both when using standard as well as customised composite components, e...

  15. [Shoulder injuries in overhead sports].

    Science.gov (United States)

    Wörtler, K

    2010-05-01

    Overhead sport places great demands on the shoulder joint. Shoulder pain in overhead athletes and throwers can in the majority of cases be attributed to lesions resulting from chronic overuse of tendons and capsuloligamentous structures or to sequels of microinstability and secondary impingement. Due to its great impact on therapeutic decisions, imaging in athletes with unclear shoulder pain is a challenge. In this connection, magnetic resonance (MR) arthrography represents the cross-sectional imaging modality of first choice, as it allows depiction and exclusion of pathologic alterations of all relevant joint structures with sufficient confidence.This article reviews the biomechanical and clinical aspects and MR arthrographic features of the most common shoulder pathologies in overhead athletes, including biceps tendinopathy, superior labral anterior-posterior (SLAP) lesions, rotator cuff lesions, as well as extrinsic and intrinsic impingement syndromes.

  16. Estimation of flashover voltage probability of overhead line insulators under industrial pollution, based on maximum likelihood method

    International Nuclear Information System (INIS)

    Arab, M.N.; Ayaz, M.

    2004-01-01

    The performance of transmission line insulator is greatly affected by dust, fumes from industrial areas and saline deposit near the coast. Such pollutants in the presence of moisture form a coating on the surface of the insulator, which in turn allows the passage of leakage current. This leakage builds up to a point where flashover develops. The flashover is often followed by permanent failure of insulation resulting in prolong outages. With the increase in system voltage owing to the greater demand of electrical energy over the past few decades, the importance of flashover due to pollution has received special attention. The objective of the present work was to study the performance of overhead line insulators in the presence of contaminants such as induced salts. A detailed review of the literature and the mechanisms of insulator flashover due to the pollution are presented. Experimental investigations on the behavior of overhead line insulators under industrial salt contamination are carried out. A special fog chamber was designed in which the contamination testing of insulators was carried out. Flashover behavior under various degrees of contamination of insulators with the most common industrial fume components such as Nitrate and Sulphate compounds was studied. Substituting the normal distribution parameter in the probability distribution function based on maximum likelihood develops a statistical method. The method gives a high accuracy in the estimation of the 50% flashover voltage, which is then used to evaluate the critical flashover index at various contamination levels. The critical flashover index is a valuable parameter in insulation design for numerous applications. (author)

  17. Shoulder injuries in overhead sports

    International Nuclear Information System (INIS)

    Woertler, K.

    2010-01-01

    Overhead sport places great demands on the shoulder joint. Shoulder pain in overhead athletes and throwers can in the majority of cases be attributed to lesions resulting from chronic overuse of tendons and capsuloligamentous structures or to sequels of microinstability and secondary impingement. Due to its great impact on therapeutic decisions, imaging in athletes with unclear shoulder pain is a challenge. In this connection, magnetic resonance (MR) arthrography represents the cross-sectional imaging modality of first choice, as it allows depiction and exclusion of pathologic alterations of all relevant joint structures with sufficient confidence. This article reviews the biomechanical and clinical aspects and MR arthrographic features of the most common shoulder pathologies in overhead athletes, including biceps tendinopathy, superior labral anterior-posterior (SLAP) lesions, rotator cuff lesions, as well as extrinsic and intrinsic impingement syndromes. (orig.) [de

  18. Simplified Antenna Group Determination of RS Overhead Reduced Massive MIMO for Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Byung Moo Lee

    2017-12-01

    Full Text Available Massive multiple-input multiple-output (MIMO systems can be applied to support numerous internet of things (IoT devices using its excessive amount of transmitter (TX antennas. However, one of the big obstacles for the realization of the massive MIMO system is the overhead of reference signal (RS, because the number of RS is proportional to the number of TX antennas and/or related user equipments (UEs. It has been already reported that antenna group-based RS overhead reduction can be very effective to the efficient operation of massive MIMO, but the method of deciding the number of antennas needed in each group is at question. In this paper, we propose a simplified determination scheme of the number of antennas needed in each group for RS overhead reduced massive MIMO to support many IoT devices. Supporting many distributed IoT devices is a framework to configure wireless sensor networks. Our contribution can be divided into two parts. First, we derive simple closed-form approximations of the achievable spectral efficiency (SE by using zero-forcing (ZF and matched filtering (MF precoding for the RS overhead reduced massive MIMO systems with channel estimation error. The closed-form approximations include a channel error factor that can be adjusted according to the method of the channel estimation. Second, based on the closed-form approximation, we present an efficient algorithm determining the number of antennas needed in each group for the group-based RS overhead reduction scheme. The algorithm depends on the exact inverse functions of the derived closed-form approximations of SE. It is verified with theoretical analysis and simulation that the proposed algorithm works well, and thus can be used as an important tool for massive MIMO systems to support many distributed IoT devices.

  19. Computer-based mechanical design of overhead lines

    Science.gov (United States)

    Rusinaru, D.; Bratu, C.; Dinu, R. C.; Manescu, L. G.

    2016-02-01

    Beside the performance, the safety level according to the actual standards is a compulsory condition for distribution grids’ operation. Some of the measures leading to improvement of the overhead lines reliability ask for installations’ modernization. The constraints imposed to the new lines components refer to the technical aspects as thermal stress or voltage drop, and look for economic efficiency, too. The mechanical sizing of the overhead lines is after all an optimization problem. More precisely, the task in designing of the overhead line profile is to size poles, cross-arms and stays and locate poles along a line route so that the total costs of the line's structure to be minimized and the technical and safety constraints to be fulfilled.The authors present in this paper an application for the Computer-Based Mechanical Design of the Overhead Lines and the features of the corresponding Visual Basic program, adjusted to the distribution lines. The constraints of the optimization problem are adjusted to the existing weather and loading conditions of Romania. The outputs of the software application for mechanical design of overhead lines are: the list of components chosen for the line: poles, cross-arms, stays; the list of conductor tension and forces for each pole, cross-arm and stay for different weather conditions; the line profile drawings.The main features of the mechanical overhead lines design software are interactivity, local optimization function and high-level user-interface

  20. Defense Outsourcing: Better Data Needed to Support Overhead Rates for A-76 Studies

    National Research Council Canada - National Science Library

    1998-01-01

    .... Specifically, this report addresses (1) what is the basis for OMB's new requirement that a standardized 12-percent overhead rate be applied to in-house cost estimates, regardless of the type of commercial activity or where in the country...

  1. An ABC analysis for power generation project

    OpenAIRE

    Batool Hasani; Younos Vakilalroaia

    2013-01-01

    One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC m...

  2. VT Green Mountain Power Line Data (Overhead Only)

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) Green Mountain Power (GMP) pole and OVERHEAD linear distribution/sub-transmission model data. THE LINEAR DISTRIBUTION LAYER ONLY INCLUDES OVERHEAD...

  3. Chosen Ciphertext Security with Optimal Ciphertext Overhead

    Science.gov (United States)

    Abe, Masayuki; Kiltz, Eike; Okamoto, Tatsuaki

    Every public-key encryption scheme has to incorporate a certain amount of randomness into its ciphertexts to provide semantic security against chosen ciphertext attacks (IND-CCA). The difference between the length of a ciphertext and the embedded message is called the ciphertext overhead. While a generic brute-force adversary running in 2t steps gives a theoretical lower bound of t bits on the ciphertext overhead for IND-CPA security, the best known IND-CCA secure schemes demand roughly 2t bits even in the random oracle model. Is the t-bit gap essential for achieving IND-CCA security? We close the gap by proposing an IND-CCA secure scheme whose ciphertext overhead matches the generic lower bound up to a small constant. Our scheme uses a variation of a four-round Feistel network in the random oracle model and hence belongs to the family of OAEP-based schemes. Maybe of independent interest is a new efficient method to encrypt long messages exceeding the length of the permutation while retaining the minimal overhead.

  4. Variance analysis refines overhead cost control.

    Science.gov (United States)

    Cooper, J C; Suver, J D

    1992-02-01

    Many healthcare organizations may not fully realize the benefits of standard cost accounting techniques because they fail to routinely report volume variances in their internal reports. If overhead allocation is routinely reported on internal reports, managers can determine whether billing remains current or lost charges occur. Healthcare organizations' use of standard costing techniques can lead to more realistic performance measurements and information system improvements that alert management to losses from unrecovered overhead in time for corrective action.

  5. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  6. Study on earthquake responses of overhead traveling cranes

    International Nuclear Information System (INIS)

    Komori, A.; Fukuda, T.; Veki, T.; Kirata, M.; Hoshii, T.; Kashiwazaki, A.

    1989-01-01

    In nuclear power plants, large-size overhead traveling cranes, such as reactor building crane and turbine building crane, are installed. These overhead cranes are used for transporting heavy loads on the operation floor, and call for safety and reliability even during strong earthquake as well as under the normal operational conditions. The seismic behaviors of overhead traveling cranes, which move on the rails, may be different from those of other structures that are anchored to the building: in the case of cranes, traveling wheels and rails can slip relative to each other when the horizontal seismic force reaches the level of frictional force. In Japan, therefore, a practical guide to the seismic design that considers the sliding has been proposed. However, detailed experimental study on sliding between wheels and rails has not been carried out. In this study, the seismic behaviors of traveling overhead cranes accompanied by sliding between wheels and rails in the traveling direction are examined

  7. Precision overhead irrigation is suitable for several Central Valley crops

    Directory of Open Access Journals (Sweden)

    Jeffrey P. Mitchell

    2016-04-01

    Full Text Available Overhead systems are the dominant irrigation technology in many parts of the world, but they are not widely used in California even though they have higher water application efficiency than furrow irrigation systems and lower labor requirements than drip systems. With water and labor perennial concerns in California, the suitability of overhead systems merits consideration. From 2008 through 2013, in studies near Five Points, California, we evaluated overhead irrigation for wheat, corn, cotton, tomato, onion and broccoli as an alternative to furrow and drip irrigation. With the exception of tomato, equal or increased yields were achieved with overhead irrigation. Many variables are involved in the choice of an irrigation system, but our results suggest that, with more research to support best management practices, overhead irrigation may be useful to a wider set of California farmers than currently use it.

  8. Technical and economical optimisation of overhead power distribution line lightning protection

    Energy Technology Data Exchange (ETDEWEB)

    Katic, N.A. [Elektrovojvodina Power Distribution Co., Nori Sad (Yugoslavia); Savic, M.S. [University of Belgrade (Yugoslavia). Faculty of Electrical Engineering

    1998-05-01

    The existing methodology for overhead line lightning protection design does not take into account customer and utility costs of line outages. In the paper a new concept of line lightning protection design based on economic optimisation is presented. Different tower types are analysed and for various undelivered energy participation factors optimal line design suggested. In line lightning flashover rate estimation both direct and induced surges are analysed. (author)

  9. Households' willingness to pay for overhead-to-underground conversion of electricity distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    McNair, Ben J., E-mail: Ben.McNair@anu.edu.a [Crawford School of Economics and Government, Australian National University, Crawford Building, Lennox Crossing, Canberra ACT 0200 (Australia); Bennett, Jeff [Crawford School of Economics and Government, Australian National University, Crawford Building, Lennox Crossing, Canberra ACT 0200 (Australia); Hensher, David A.; Rose, John M. [Institute of Transport and Logistics Studies, The Business School, University of Sydney, NSW 2006 (Australia)

    2011-05-15

    Underground low-voltage electricity networks have several advantages over overhead networks including reliability of supply, safety and improved visual amenity. The economic viability of replacing existing overhead networks with new underground networks depends on the value of these benefits to households, but no complete value estimates are available in the literature. This paper represents a contribution towards addressing this research gap. A stated choice survey is used to estimate willingness to pay for undergrounding in established residential areas in Canberra, Australia. Average willingness to pay is at least A$6838 per household and there is significant variation in preferences over the population. The results suggest that benefits would be highest in areas with higher household income and older residents where visual amenity, safety, tree trimming, or restrictions on the use of yard space are of concern. - Research highlights: {yields} A choice experiment is used to estimate values for undergrounding electricity wires. {yields} Average willingness to pay is at least A$6838 per household in Canberra, Australia. {yields} Preferences vary considerably over the population. {yields} Benefits would be highest in areas with higher income and older residents.

  10. Overvoltage and Insulation Coordination of Overhead Lines in Multiple-Terminal MMC-HVDC Link for Wind Power Delivery

    Directory of Open Access Journals (Sweden)

    Huiwen He

    2017-01-01

    Full Text Available The voltage-sourced converter-based HVDC link, including the modular multilevel converter (MMC configuration, is suitable for wind power, photovoltaic energy, and other kinds of new energy delivery and grid-connection. Current studies are focused on the MMC principles and controls and few studies have been done on the overvoltage of transmission line for the MMC-HVDC link. The main reason is that environmental factors have little effect on DC cables and the single-phase/pole fault rate is low. But if the cables were replaced by the overhead lines, although the construction cost of the project would be greatly reduced, the single-pole ground fault rate would be much higher. This paper analyzed the main overvoltage types in multiple-terminal MMC-HVDC network which transmit electric power by overhead lines. Based on ±500 kV multiple-terminal MMC-HVDC for wind power delivery project, the transient simulation model was built and the overvoltage types mentioned above were studied. The results showed that the most serious overvoltage was on the healthy adjacent line of the faulty line caused by the fault clearing of DC breaker. Then the insulation coordination for overhead lines was conducted according to the overvoltage level. The recommended clearance values were given.

  11. Snow accretion on overhead wires

    Energy Technology Data Exchange (ETDEWEB)

    Sakamoto, Y. [Meteorological Research Inst. for Technology Co. Ltd., Tokyo (Japan); Tachizaki, S.; Sudo, N. [Tohoku Electric Power Co. Ltd., Miyagi (Japan)

    2005-07-01

    Wet snow accretion can cause extensive damage to transmission systems. This paper reviewed some of the difficulties faced by researchers in the study of wet snow accretion on overhead lines in Japan. The study of snow accretion phenomena is complicated by the range of phase changes in water. Snowflakes produced in an upper atmospheric layer with a temperature below freezing do not melt when they go through a lower atmospheric layer with a temperature above freezing, but are in a mixed state of solid and liquid due to the latent heat of melting. The complicated properties of water make studies of snow accretion difficult, as well as the fact that snow changes its physical properties rapidly, due to the effects of ambient temperature, rainfall, and solar radiation. The adhesive forces that cause snow accretion include freezing; bonding through freezing; sintering; condensation and freezing of vapor in the air; mechanical intertwining of snowflakes; capillary action due to liquids; coherent forces between ice particles and water formed through the metamorphosis of snowflakes. In addition to these complexities, differences in laboratory room environments and natural snow environments can also pose difficulties for researchers. Equations describing the relationship between the density of accreted snow and the meteorological parameters involved were presented, as well as empirical equations which suggested that snow accretion efficiency has a dependency on air temperature. An empirical model for estimating snow loads in Japan was outlined, as well as various experiments observing show shedding. Correlations for wet snow accretion included precipitation intensity; duration of precipitation; air temperature; wind speed and wind direction in relation to the overhead line. Issues concerning topography and wet snow accretion were reviewed. It was concluded that studies of snow accretion will benefit by the collection of data in each matrix of the relevant parameters. 12 refs

  12. A Reference Model for Virtual Machine Launching Overhead

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Hao; Ren, Shangping; Garzoglio, Gabriele; Timm, Steven; Bernabeu, Gerard; Chadwick, Keith; Noh, Seo-Young

    2016-07-01

    Cloud bursting is one of the key research topics in the cloud computing communities. A well designed cloud bursting module enables private clouds to automatically launch virtual machines (VMs) to public clouds when more resources are needed. One of the main challenges in developing a cloud bursting module is to decide when and where to launch a VM so that all resources are most effectively and efficiently utilized and the system performance is optimized. However, based on system operational data obtained from FermiCloud, a private cloud developed by the Fermi National Accelerator Laboratory for scientific workflows, the VM launching overhead is not a constant. It varies with physical resource utilization, such as CPU and I/O device utilizations, at the time when a VM is launched. Hence, to make judicious decisions as to when and where a VM should be launched, a VM launching overhead reference model is needed. In this paper, we first develop a VM launching overhead reference model based on operational data we have obtained on FermiCloud. Second, we apply the developed reference model on FermiCloud and compare calculated VM launching overhead values based on the model with measured overhead values on FermiCloud. Our empirical results on FermiCloud indicate that the developed reference model is accurate. We believe, with the guidance of the developed reference model, efficient resource allocation algorithms can be developed for cloud bursting process to minimize the operational cost and resource waste.

  13. 30 CFR 56.16015 - Work or travel on overhead crane bridges.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 56... Materials Storage and Handling § 56.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with substantial...

  14. 30 CFR 57.16015 - Work or travel on overhead crane bridges.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Work or travel on overhead crane bridges. 57... MINES Materials Storage and Handling § 57.16015 Work or travel on overhead crane bridges. No person shall work from or travel on the bridge of an overhead crane unless the bridge is provided with...

  15. Accounting of allocation of production enterprises’ overhead costs

    Directory of Open Access Journals (Sweden)

    О.V. Ivaniuta

    2016-12-01

    Full Text Available Taking into account the complexity of engineering technological cycles, the use of traditional approaches to the allocation of overhead costs at the researching enterprises is inexpedient and inefficient. The authors find out that to solve this problem it is not enough to choose only one base of allocation because the formed prime cost with such an approach will not meet the reality. That is why it is suggested to use a multilevel allocation of overhead costs. The proposed approach involves the allocation of overhead costs at the following levels: fixed and variable, with shops of main and auxiliary production, calculation stations, some orders. Each level involves the selection of individual allocation bases that are grouped on economic, technological and integrated ones.

  16. The Motion Planning of Overhead Crane Based on Suppressing Payload Residual Swing

    Directory of Open Access Journals (Sweden)

    Liu Hua-sen

    2016-01-01

    Full Text Available Since the overhead crane system is subject to under actuation system due to that overhead crane and payload are connected by flexibility wire rope. The payload generates residual swing when the overhead crane is accelerating/ decelerating the motions. This may cause trouble for the payload precise positioning and motion planning. Hence, an optimization input shaping control method is presented to reduce the under actuated overhead crane’s payload swing caused via the inertia force. The dynamic model of the overhead crane is proposed according to the physics structure of the crane. The input shaper based on the motion planning of the crane is used as the feed forward input to suppress payload residual swing. Simulation and experiment results indicate that the ZV input shaper and ZVD input shaper can reduce the payload swing of the overhead crane.

  17. Seismic evaluation and upgrading design of overhead roads between reactor buildings of WWER-1000 MW type NPP

    International Nuclear Information System (INIS)

    Jordanov, M.J.; Stoyanov, G.S.; Geshanov, I.H.; Kirilov, K.P.; Schuetz, W.

    2003-01-01

    This paper presents results obtained during the study of overhead roads between Reactor Building (RB) of WWER-1000 MW NPP and possible measures for their seismic upgrade. The main objective of this project is to evaluate the behavior of overhead roads under site-specific seismic loading and to determine whether this structure satisfies current international safety regulations, followed by development of upgrading concepts. Overhead roads are pre-cast RC structure, which can be divided to separate substructures. They comprise of pedestrian gallery and pipeline box, connecting reactor buildings with auxiliary building. They are mounted at approximately 10 m above ground level. The overhead roads are evaluated for Review Level Earthquake (RLE) as seismic category II structures. As seismic input motion is RLE, free field response spectra anchored to 0.2 g PGA are used with 0.5 scaling factor. Soil-Structure Interaction effects are taken into account through equivalent soil springs with frequency adjusted stiffness. In order to meet the objective of the project a technical design specification is developed for conformance with International, US and Bulgarian standards and codes, taking into account site specific conditions. The general approach is consistent with up-to-date practice for evaluation and upgrade of nuclear power plant facilities. The separate steps comprising the overall fulfillment of project's major objectives may be summarized as follows: study of all available data for initial design and as built conditions, creation of 3-D detailed finite element models for as-built structure, determination of dynamic characteristics, evaluation of adequacy of initial design under new seismic loading (calculation of D/C ratios for structural members and connections, evaluation of embedment lengths for embedded parts and rebars, deformation evaluation, stability checks), development of upgrading concepts for enhancement, verification of capability of upgraded structure

  18. Development of sensorless easy-to-use overhead crane system via simulation based control

    Science.gov (United States)

    Tagawa, Yasutaka; Mori, Yoshihito; Wada, Masaomi; Kawajiri, Eisaku; Nouzuka, Kazuma

    2016-09-01

    This paper describes the newly developed overhead crane which has a sensorless vibration control system. Generally, loads which are carried by the overhead cranes are easy to vibrate and only skilled people can operate the cranes. Therefore, a lot of studies have been done to solve this problem by using feedback control with vibration sensors. However vibration sensors often break down in severe industrial environment and more reliable control systems are required. For this reason, we have been developing sensorless control system for overhead cranes. In this paper, we firstly introduce basic idea of simulation based control which is called IDCS, then overview and modeling of the overhead crane is presented. Next, the control system design of the overhead crane is discussed, and experimental results are shown for real overhead crane with 2 axes.

  19. Area overhead analysis of SEF: A design methodology for tolerating SEU

    International Nuclear Information System (INIS)

    Blaquiere, Y.; Savaria, Y.

    1987-01-01

    Soft-Error filtering (SEF) is a design methodology proposed recently for implementing machines tolerant to SEU. This paper deals mainly with the evaluation and the reduction of the area overhead brought by SEF. A new shift register filtering latch configuration is proposed. The use of this latch, optimized for minimum area, reduces the area overhead by a factor of 2.6, when compared with latches optimized for time performance. A detailed analysis of the area overhead with SEF implemented on two relatively complex machines produced the following results: a SEF version of the 6800 microprocessor would require an area overhead varying between 12% and 69% depending on the SEF latch used and, a SEF version of the RISCII microprocessor would result in a 38.8% area overhead. An analysis of the cost of implementing the Hamming error correcting code on a register array is presented and this cost is compared with that of implementing SEU tolerance directly with SEF. Finally, a hybrid approach is proposed where a large register array is protected by an error correcting code whereas the isolated latches are replaced by filtering latches. This hybrid approach reduces the area overhead to 18.8% for the RISCII architecture

  20. [Fuel Rod Consolidation Project]: The estimated total life cycle cost for the 30-year operation of prototypical consolidation demonstration equipment: Volume 4, Phase 2

    International Nuclear Information System (INIS)

    1987-01-01

    The Total Life Cycle Costs have been developed for the construction, operation and decommissioning of a single line of hot-cell-enclosed production consolidation equipment operating on spent fuel at the rate of 750 MTU/year for 30 years. The cost estimate is for a single production line that is part of an overall facility at either a Monitored Retrievable Storage or a Repository facility. This overall facility would include other capabilities and possibly other consolidation lines. However, no costs were included in the cost estimate for other portions of the plant, except that staff costs include an overhead charge that reflects the overhead support services in an overall facility

  1. Ergonomic evaluation of a wearable assistive device for overhead work.

    Science.gov (United States)

    Rashedi, Ehsan; Kim, Sunwook; Nussbaum, Maury A; Agnew, Michael J

    2014-01-01

    Overhead work is an important risk factor for upper extremity (UE) musculoskeletal disorders. We examined the potential of a mechanical arm and an exoskeletal vest as a wearable assistive device (WADE) for overhead work. Twelve participants completed 10 minutes of simulated, intermittent overhead work, using each of three payloads (1.1, 3.4 and 8.1 kg) and with/without the WADE. Ratings of perceived discomfort (RPDs) and electromyography (EMG) were obtained for the upper arms, shoulders and low back. Using the WADE, UE RPDs decreased by ∼50% with the heavier payloads, whereas smaller (∼25%) and non-significant increases in low-back RPDs were found and were relatively independent of payload. Changes in RPDs with WADE use were consistent with physical demands indicated by EMG, though EMG-based differences in fatigue were less apparent. Participants generally preferred using the WADE, particularly with heavier payloads. These results supported the potential utility of a WADE as an intervention for overhead work.

  2. Overhead distribution line models for harmonics studies

    Energy Technology Data Exchange (ETDEWEB)

    Nagpal, M.; Xu, W.; Dommel, H.W.

    1994-01-01

    Carson's formulae and Maxwell's potential coefficients are used for calculating the per unit length series impedances and shunt capacitances of the overhead lines. The per unit length values are then used for building the models, nominal pi-circuit, and equivalent pi-circuit at the harmonic frequencies. This paper studies the accuracy of these models for presenting the overhead distribution lines in steady-state harmonic solutions at frequencies up to 5 kHz. The models are verified with a field test on a 25 kV distribution line and the sensitivity of the models to ground resistivity, skin effect, and multiple grounding is reported.

  3. Low overhead and nonlinear-tolerant adaptive zero-guard-interval CO-OFDM.

    Science.gov (United States)

    Wang, Wei; Zhuge, Qunbi; Gao, Yuliang; Qiu, Meng; Morsy-Osman, Mohamed; Chagnon, Mathieu; Xu, Xian; Plant, David V

    2014-07-28

    We propose an adaptive channel estimation (CE) method for zero-guard-interval (ZGI) coherent optical (CO)-OFDM systems, and demonstrate its performance in a single channel 28 Gbaud polarization-division multiplexed ZGI CO-OFDM experiment with only 1% OFDM processing overhead. We systematically investigate its robustness against various transmission impairments including residual chromatic dispersion, polarization-mode dispersion, state of polarization rotation, sampling frequency offset and fiber nonlinearity. Both experimental and numerical results show that the adaptive CE-aided ZGI CO-OFDM is highly robust against these transmission impairments in fiber optical transmission systems.

  4. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  5. Accuracy of hazardous waste project estimates

    International Nuclear Information System (INIS)

    Hackney, J.W.

    1989-01-01

    The HAZRATE system has been developed to appraise the current state of definition of hazardous waste remedial projects. This is shown to have a high degree of correlation to the financial risk of such projects. The method employs a weighted checklist indicating the current degree of definition of some 150 significant project elements. It is based on the author's experience with a similar system for establishing the risk characteristics of process plant projects (Hackney, 1965 and 1989; 1985). In this paper definition ratings for 15 hazardous waste remedial projects have been correlated with the excesses of their actual costs over their base estimates, excluding any allowances for contingencies. Equations are presented, based on this study, for computation of the contingency allowance needed and estimate accuracy possible at a given stage of project development

  6. Modeling the Virtual Machine Launching Overhead under Fermicloud

    Energy Technology Data Exchange (ETDEWEB)

    Garzoglio, Gabriele [Fermilab; Wu, Hao [Fermilab; Ren, Shangping [IIT, Chicago; Timm, Steven [Fermilab; Bernabeu, Gerard [Fermilab; Noh, Seo-Young [KISTI, Daejeon

    2014-11-12

    FermiCloud is a private cloud developed by the Fermi National Accelerator Laboratory for scientific workflows. The Cloud Bursting module of the FermiCloud enables the FermiCloud, when more computational resources are needed, to automatically launch virtual machines to available resources such as public clouds. One of the main challenges in developing the cloud bursting module is to decide when and where to launch a VM so that all resources are most effectively and efficiently utilized and the system performance is optimized. However, based on FermiCloud’s system operational data, the VM launching overhead is not a constant. It varies with physical resource (CPU, memory, I/O device) utilization at the time when a VM is launched. Hence, to make judicious decisions as to when and where a VM should be launched, a VM launch overhead reference model is needed. The paper is to develop a VM launch overhead reference model based on operational data we have obtained on FermiCloud and uses the reference model to guide the cloud bursting process.

  7. Retrofit curtain for overhead doors

    Energy Technology Data Exchange (ETDEWEB)

    Leckie, R E

    1987-12-29

    A heat insulating curtain has been developed for reducing heat losses through overhead doors of the type commonly found in industrial warehouses. The curtain consists of a reinforced polyester fabric attached to the outside top of the overhead door and moves with the door as it opens and closes. A T-shaped edge track seals the edges of the curtain to the door frame; the edge of the curtain is also T-shaped and runs up and down the track as the curtain is raised and lowered. The curtain fabric is ultraviolet resistant, durable, flexible, and transparent, and transforms the door into a solar collector which provides solar heated air to the building interior. Two curtains have been satisfactorily installed and tested at a warehouse in Calgary, Alberta. A market evaluation study was conducted to determine the possible buyers for such a door curtain. A target market consisting of those wishing to fix old, leaky doors was selected and a marketing strategy developed. The described strategy includes product development, pricing, distribution, promotion, and advertising. 2 figs., 1 tab.

  8. Feasibility of high-speed power line carrier system to Japanese overhead low voltage distribution lines; Teiatsu haidensen hanso no kosokuka no kanosei (hanso sningo denpa purogram no kanosei)

    Energy Technology Data Exchange (ETDEWEB)

    Suzuki, T.; Takeshita, K.; Ishino, R.

    2000-06-01

    The high-speed distribution line carrier systems on underground distribution lines are being developed in Germany. To estimate these systems on Japanese overhead low voltage distribution lines, the Carrier Propagation Program has been developed and applicability of OFDM system was roughly estimated. 1. Carrier Propagation Program Carrier Propagation Program that calculates the carrier propagation characteristics of any line structure was developed. 2. Carrier propagation characteristics Carrier propagation characteristics on typical Japanese overhead low voltage distribution lines were calculated 3.Rough estimation of OFDM system Electric fields caused by carrier at near point were calculated on the basis on carrier propagation characteristics. Results of rough estimation are as follows: - Electric field caused by carrier of more than 2Mbps system exceeds the value of the regulation. (author)

  9. Characterization Results for the January 2017 H-Tank Farm 2H Evaporator Overhead Sample

    Energy Technology Data Exchange (ETDEWEB)

    Truong, T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Nicholson, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-04-11

    This report contains the radioanalytical results of the 2H evaporator overhead sample received at SRNL on January 19, 2017. Specifically, concentrations of 137Cs, 90Sr, and 129I are reported and compared to the corresponding Waste Acceptance Criteria (WAC) limits of the Effluent Treatment Project (ETP) Waste Water Collection Tank (WWCT) (rev. 6). All of the radionuclide concentrations in the sample were found to be in compliance with the ETP WAC limits.

  10. Estimation of volatility of selected oil production projects

    International Nuclear Information System (INIS)

    Costa Lima, Gabriel A.; Suslick, Saul B.

    2006-01-01

    In oil project valuation and investment decision-making, volatility is a key parameter, but it is difficult to estimate. From a traditional investment viewpoint, volatility reduces project value because it increases its discount rate via a higher risk premium. Contrarily, according to the real-option pricing theory, volatility may aggregate value to the project, since the downside potential is limited whereas the upside is theoretically unbounded. However, the estimation of project volatility is very complicated since there is not a historical series of project values. In such cases, many analysts assume that oil price volatility is equal to that of project. In order to overcome such problems, in this paper an alternative numerical method based on present value of future cash flows and Monte Carlo simulation is proposed to estimate the volatility of projects. This method is applied to estimate the volatility of 12 deep-water offshore oil projects considering that oil price will evolve according to one of two stochastic processes: Geometric Brownian Motion and Mean-Reverting Motion. Results indicate that the volatility of commodity usually undervalue that of project. For the set of offshore projects analyzed in this paper, project volatility is at least 79% higher than that of oil prices and increases dramatically in those cases of high capital expenditures and low price. (author)

  11. Nitrate leaching beneath a containerized nursery crop receiving trickle or overhead irrigation.

    Science.gov (United States)

    Colangelo, D J; Brand, M H

    2001-01-01

    Container production of nursery crops is intensive and a potential source of nitrogen release to the environment. This study was conducted to determine if trickle irrigation could be used by container nursery producers as an alternative to standard overhead irrigation to reduce nitrogen release into the environment. The effect of overhead irrigation and trickle irrigation on leachate nitrate N concentration, flow-weighted nitrate N concentration, leachate volume, and plant growth was investigated using containerized rhododendron (Rhododendron catawbiense Michx. 'Album') supplied with a controlled-release fertilizer and grown outdoors on top of soil-monolith lysimeters. Leachate was collected over two growing seasons and overwinter periods, and natural precipitation was allowed as a component of the system. Precipitation accounted for 69% of the water entering the overhead-irrigated system and 80% of the water entering the trickle-irrigated system. Leachate from fertilized plants exceeded the USEPA limit of 10 mg L(-1) at several times and reached a maximum of 26 mg L(-1) with trickle irrigation. Average annual loss of nitrate N in leachate for fertilized treatments was 51.8 and 60.5 kg ha(-1) for the overhead and trickle treatments, respectively. Average annual flow-weighted concentration of nitrate N in leachate of fertilized plants was 7.2 mg L(-1) for overhead irrigation and 12.7 mg L(-1) for trickle irrigation. Trickle irrigation did not reduce the amount of nitrate N leached from nursery containers when compared with overhead irrigation because precipitation nullified the potential benefits of reduced leaching fractions and irrigation inputs provided under trickle irrigation.

  12. Collecting and using weather data for the design of overhead lines according to IEC 60826

    International Nuclear Information System (INIS)

    Rolfseng, L.; Fikke, S.; Ghannoum, E.

    2005-01-01

    Ice and wind loads on conductors and earth wires are the most important environmental factors for the mechanical design of overhead lines. This paper addressed the economic importance of long-term recording and measuring of weather data and provided details of their use according to a recent International Electrochemical Commission technical report (60826). The procedures used to calculate design weather loads by applying the Gumbal cumulative distribution function were outlined using data collected from Studnice in the Czech Republic, where ice loads have been measured since 1940. Based on the calculations, it was suggested that predicting ice loads based on a reduced number of years may lead to either under or over designing overhead lines. An example of ice load measurements and records showed that the standard deviation of maximum annual ice loads is large. Ice and wind load data from previous technical reports were presented. It was noted that the number of years with observations, the average value and the standard deviation are the necessary parameters for making the statistical analyses of design wind and ice loads. Information on cost of overhead lines in Norway was provided, as well as details of ice load recommendations currently used. It was estimated that the total price of the uncertainty in the design ice loads for the total electric overhead line network in Norway was $30 million, representing 10 per cent of the annual replacement value of the grid. It was concluded that long-term data acquisition of ice loads could reduce investment costs when design ice loads are too high, and also alleviate damage to transmission system and loss of supply due to ice storms when the design ice value is too low. 3 refs., 4 tabs., 4 figs

  13. Seismic behavior with sliding of overhead travelling crane

    International Nuclear Information System (INIS)

    Komori, Akio; Ueki, Takashi; Hirata, Masami; Hoshii, Tsutomu; Kashiwazaki, Akihiro.

    1989-01-01

    In this study, the seismic behavior of an overhead travelling crane with the sliding between travelling wheels and rails is examined. First, the dynamic characteristic test of the actual crane installed in a reactor building and the sliding test of the rigid-element model to observe the basic sliding characteristic were performed. Next, to examine the dynamic response with sliding, shaking tests using the scaled model of an actual crane were conducted. From these results, useful design information about seismic behavior of an overhead travelling crane was obtained. It was also observed that numerical predictions considering sliding behavior have good agreement with the experimental results and are applicable to seismic design. (author)

  14. A modelling approach for railway overhead line equipment asset management

    OpenAIRE

    Kilsby, Paul; Remenyte-Prescott, Rasa; Andrews, John

    2017-01-01

    The Overhead Line Equipment (OLE) is a critical sub-system of the 25kV AC overhead railway electrification system. If OLE asset management strategies can be evaluated using a whole lifecycle cost analysis that considers degradation processes and maintenance activities of the OLE components, the investment required to deliver the level of performance desired by railway customers and regulators can be based on evidence from the analysis results. A High Level Petri Net (HLPN) model, proposed in ...

  15. A Low-Overhead Cooperative Retransmission Scheme for IR-UWB Networks

    Directory of Open Access Journals (Sweden)

    Ghasem Naddafzadeh Shirazi

    2008-01-01

    Full Text Available The UWB unique properties such as fine ranging and immunity to small scale fading are utilized in order to exploit the multiuser diversity in UWB networks. The optimal cooperation strategies in the absence of control packet overhead are analyzed in the proactive and reactive settings. It is shown that the proposed method achieves a considerable diversity gain while minimizing the overhead of control packet exchange that is required for coordination among the relays.

  16. VT VEC Primary Overhead and Underground Distribution Lines

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) Vermont Electric Cooperative, Inc. (VEC) Primary Overhead and Underground Distribution Lines. VEC’s Distribution lines were drawn from pole to...

  17. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  18. Limiting electric fields of HVDC overhead power lines.

    Science.gov (United States)

    Leitgeb, N

    2014-05-01

    As a consequence of the increased use of renewable energy and the now long distances between energy generation and consumption, in Europe, electric power transfer by high-voltage (HV) direct current (DC) overhead power lines gains increasing importance. Thousands of kilometers of them are going to be built within the next years. However, existing guidelines and regulations do not yet contain recommendations to limit static electric fields, which are one of the most important criteria for HVDC overhead power lines in terms of tower design, span width and ground clearance. Based on theoretical and experimental data, in this article, static electric fields associated with adverse health effects are analysed and various criteria are derived for limiting static electric field strengths.

  19. Lightning in hybrid cable-overhead lines and consequent transient overvoltages

    DEFF Research Database (Denmark)

    Silva, Filipe Miguel Faria da; Schultz Pedersen, Kasper; Bak, Claus Leth

    2017-01-01

    Whereas lines that consist entirely of underground cable are naturally protected from lightning, the phenomenon must be considered for lines that are a mix of overhead lines and underground cables. The difference between overhead lines and underground cables wave impedances may lead to transient ...... conductor and for hits on the earth wire, with and without back flashover. For the most common situation, stroke on the earth wire, it is demonstrated that the cable’s ground propagation mode is dominant, reducing the impact of the reflections....

  20. Comparing methodologies for the allocation of overhead and capital costs to hospital services.

    Science.gov (United States)

    Tan, Siok Swan; van Ineveld, Bastianus Martinus; Redekop, William Ken; Hakkaart-van Roijen, Leona

    2009-06-01

    Typically, little consideration is given to the allocation of indirect costs (overheads and capital) to hospital services, compared to the allocation of direct costs. Weighted service allocation is believed to provide the most accurate indirect cost estimation, but the method is time consuming. To determine whether hourly rate, inpatient day, and marginal mark-up allocation are reliable alternatives for weighted service allocation. The cost approaches were compared independently for appendectomy, hip replacement, cataract, and stroke in representative general hospitals in The Netherlands for 2005. Hourly rate allocation and inpatient day allocation produce estimates that are not significantly different from weighted service allocation. Hourly rate allocation may be a strong alternative to weighted service allocation for hospital services with a relatively short inpatient stay. The use of inpatient day allocation would likely most closely reflect the indirect cost estimates obtained by the weighted service method.

  1. Estimating software development project size, using probabilistic ...

    African Journals Online (AJOL)

    Estimating software development project size, using probabilistic techniques. ... of managing the size of software development projects by Purchasers (Clients) and Vendors (Development ... EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  2. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  3. Calculation and reduction of the sound emissions of overhead power lines

    International Nuclear Information System (INIS)

    Straumann, U.

    2007-01-01

    In this dissertation, Ulrich Straumann of the Swiss Federal Institute of Technology in Zurich, Switzerland, discusses the reduction of sound emissions from overhead power lines. Corona-discharges occur during wet weather or when foggy or icing conditions prevail. Apart from these wide-band crackling noises, low-frequency, tonal emissions also occur. The CONOR (Corona Noise Reduction) project examined these emissions at a frequency of twice the mains frequency and looked for economically feasible solutions to the problems caused by them. The source of these emissions and the mechanisms causing them are discussed. Also, ways of calculating their strength are presented. The effects of varying cable geometry and construction are discussed, as are hydrophilic coatings that could be used to reduce sound emissions.

  4. Analysis of GIS data to investigate natural resource impacts of high-voltage overhead lines in the examples in Lower Saxony and North Rhine-Westphalia

    International Nuclear Information System (INIS)

    Thinh, Nguyen Xuan; Sander, Leon; Kopec, Jakob; Muehlnickel, Kai

    2013-01-01

    In this paper we describe shortly Lower Saxony and North Rhine-Westphalia as study areas and the legal framework, both in the context of natural resource impacts of high-voltage overhead lines. We then conduct the buffer analysis of a GIS dataset in order to investigate natural resource impacts of existing high-voltage overhead lines in the two mentioned study areas. The paper is based upon the first results of the interdisciplinary research and development project ''Power Network Planning'' funded as part of the 6th Energy research program ''Research for an environmentally friendly, reliable and affordable energy supply'' by the German Federal Ministry of Economics and Technology (BMWi). (orig.)

  5. Damping of cable vibrations in overhead lines. Daempfung von Leiterseilschwingungen in Hochspannungs-Freileitungen

    Energy Technology Data Exchange (ETDEWEB)

    Moecks, L

    1981-01-01

    The 'Stockbridge'-type vibration damper is presented and its dynamic characteristics are analytically described. In consideration of standard line data a dynamic model of the overhead line is designed. The vibration impulse by the wind and self-damping of the cable are explained with relations being deduced. The entire mathematical model 'overhead line with and without damper' is finally forming the basis for performing numerous parameter studies, with the importance of the damper characteristics and the damper installation site to the value of the dynamic load of the cable being shown very clearly. The presented technique is also convenient for checking the vibration intensity of overhead lines to be newly planned.

  6. Study on Top-Down Estimation Method of Software Project Planning

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei

    2006-01-01

    This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.

  7. Efficiency of overhead ceiling lifts in reducing musculoskeletal injury among carers working in long-term care institutions.

    Science.gov (United States)

    Alamgir, Hasanat; Yu, Shicheng; Fast, Catherine; Hennessy, Stephanie; Kidd, Catherine; Yassi, Annalee

    2008-05-01

    A longitudinal study was conducted in three long-term care facilities to evaluate the effectiveness and cost benefit of overhead lifts in reducing the risk of musculoskeletal injury among healthcare workers. Analysis of injury trends spanning 6 years before intervention (1996-2001) and 4 years after intervention (2002-2005) found a significant and sustained decrease in workers' compensation claims per number of beds and in working days lost per bed. The payback period was estimated under various assumptions and varied from 6.3 to 6.2 years if only direct claim-cost savings were included, and from 2.06 to 3.20 years when indirect savings were added. The significant reductions in injury rates and compensation claims support intervention with overhead ceiling lifts. A more comprehensive evaluation of such programmes should incorporate in the analysis important variables such as staffing ratios, job stresses, injury reporting systems and compensation policies during the study period.

  8. Use of Overhead Transparencies in Collaborative Business Writing.

    Science.gov (United States)

    Barker, Randolph T.; And Others

    1991-01-01

    Asserts that small group collaborative writing exercises that produce overhead transparencies for large class critique can be an effective method for teaching letter and memorandum construction. Offers a five-step process for encouraging individual and collaborative writing skills. (PRA)

  9. Proximity to overhead power lines and childhood leukaemia

    DEFF Research Database (Denmark)

    Amoon, Aryana T; Crespi, Catherine M; Ahlbom, Anders

    2018-01-01

    BACKGROUND: Although studies have consistently found an association between childhood leukaemia risk and magnetic fields, the associations between childhood leukaemia and distance to overhead power lines have been inconsistent. We pooled data from multiple studies to assess the association with d...

  10. Variance in parametric images: direct estimation from parametric projections

    International Nuclear Information System (INIS)

    Maguire, R.P.; Leenders, K.L.; Spyrou, N.M.

    2000-01-01

    Recent work has shown that it is possible to apply linear kinetic models to dynamic projection data in PET in order to calculate parameter projections. These can subsequently be back-projected to form parametric images - maps of parameters of physiological interest. Critical to the application of these maps, to test for significant changes between normal and pathophysiology, is an assessment of the statistical uncertainty. In this context, parametric images also include simple integral images from, e.g., [O-15]-water used to calculate statistical parametric maps (SPMs). This paper revisits the concept of parameter projections and presents a more general formulation of the parameter projection derivation as well as a method to estimate parameter variance in projection space, showing which analysis methods (models) can be used. Using simulated pharmacokinetic image data we show that a method based on an analysis in projection space inherently calculates the mathematically rigorous pixel variance. This results in an estimation which is as accurate as either estimating variance in image space during model fitting, or estimation by comparison across sets of parametric images - as might be done between individuals in a group pharmacokinetic PET study. The method based on projections has, however, a higher computational efficiency, and is also shown to be more precise, as reflected in smooth variance distribution images when compared to the other methods. (author)

  11. Rehabilitation of the Overhead Athlete’s Elbow

    Science.gov (United States)

    Wilk, Kevin E.; Macrina, Leonard C.; Cain, E. Lyle; Dugas, Jeffrey R.; Andrews, James R.

    2012-01-01

    The activities required during overhead sports, particularly during baseball pitching, produce large forces at the elbow joint. Injuries to the elbow joint frequently occur in the overhead athlete because of the large amount of forces observed during the act of throwing, playing tennis, or playing golf. Injuries may result because of repetitive overuse, leading to tissue failure. Rehabilitation following injury or surgery to the throwing elbow is vital to fully restore normal function and return the athlete to competition as quickly and safely as possible. Rehabilitation of the elbow, whether following injury or postsurgical, must follow a progressive and sequential order, building on the previous phase, to ensure that healing tissues are not compromised. Emphasis is placed on restoring full motion, muscular strength, and neuromuscular control while gradually applying loads to healing tissue. In addition, when one is creating a rehabilitation plan for athletes, it is imperative to treat the entire upper extremity, core, and legs to create and dissipate the forces generated at each joint. PMID:23016113

  12. Shoulder injuries in overhead sports; Schultergelenkverletzungen bei Ueberkopfsportarten

    Energy Technology Data Exchange (ETDEWEB)

    Woertler, K. [Technische Universitaet Muenchen (Germany). Institut fuer Roentgendiagnostik

    2010-05-15

    Overhead sport places great demands on the shoulder joint. Shoulder pain in overhead athletes and throwers can in the majority of cases be attributed to lesions resulting from chronic overuse of tendons and capsuloligamentous structures or to sequels of microinstability and secondary impingement. Due to its great impact on therapeutic decisions, imaging in athletes with unclear shoulder pain is a challenge. In this connection, magnetic resonance (MR) arthrography represents the cross-sectional imaging modality of first choice, as it allows depiction and exclusion of pathologic alterations of all relevant joint structures with sufficient confidence. This article reviews the biomechanical and clinical aspects and MR arthrographic features of the most common shoulder pathologies in overhead athletes, including biceps tendinopathy, superior labral anterior-posterior (SLAP) lesions, rotator cuff lesions, as well as extrinsic and intrinsic impingement syndromes. (orig.) [German] Ueberkopfsportarten stellen grosse Anforderungen an das Schultergelenk. Schulterbeschwerden bei Ueberkopf- und Wurfsportlern koennen in der Mehrzahl der Faelle auf eine chronische Ueberlastung von Sehnen und Kapsel-Band-Strukturen oder auf die Folgen einer Mikroinstabilitaet und sekundaerer Impingementsyndrome zurueckgefuehrt werden. Wegen ihres grossen Einflusses auf die Therapieentscheidung stellt die Bildgebung bei Athleten mit unklaren Schulterbeschwerden eine Herausforderung dar. Die MR-Arthrographie ist in diesem Zusammenhang als Schnittbildverfahren der ersten Wahl anzusehen, da sie den Nachweis bzw. Ausschluss pathologischer Veraenderungen aller relevanten Gelenkstrukturen mit ausreichender Sicherheit ermoeglicht. Dieser Artikel gibt eine Uebersicht ueber biomechanische und klinische Aspekte sowie MR-arthrographische Befunde der haeufigsten Schultergelenkpathologien bei Ueberkopfsportlern, wie Bizepstendinopathie, Superior-labral-anterior-posterior- (SLAP-)Laesionen, Laesionen der

  13. Predicting Software Projects Cost Estimation Based on Mining Historical Data

    OpenAIRE

    Najadat, Hassan; Alsmadi, Izzat; Shboul, Yazan

    2012-01-01

    In this research, a hybrid cost estimation model is proposed to produce a realistic prediction model that takes into consideration software project, product, process, and environmental elements. A cost estimation dataset is built from a large number of open source projects. Those projects are divided into three domains: communication, finance, and game projects. Several data mining techniques are used to classify software projects in terms of their development complexity. Data mining techniqu...

  14. 78 FR 77027 - Overhead Clearance (Air-Draft) Accidents

    Science.gov (United States)

    2013-12-20

    ... No. USCG-2013-0466] Overhead Clearance (Air-Draft) Accidents AGENCY: Coast Guard, DHS. ACTION... clearance (air-draft) accidents. In its petition, which calls for vessel masters to be provided with... accidents that it says were avoidable and that resulted in damage to or destruction of waterway...

  15. Detection-Guided Fast Affine Projection Channel Estimator for Speech Applications

    Directory of Open Access Journals (Sweden)

    Yan Wu Jennifer

    2007-04-01

    Full Text Available In various adaptive estimation applications, such as acoustic echo cancellation within teleconferencing systems, the input signal is a highly correlated speech. This, in general, leads to extremely slow convergence of the NLMS adaptive FIR estimator. As a result, for such applications, the affine projection algorithm (APA or the low-complexity version, the fast affine projection (FAP algorithm, is commonly employed instead of the NLMS algorithm. In such applications, the signal propagation channel may have a relatively low-dimensional impulse response structure, that is, the number m of active or significant taps within the (discrete-time modelled channel impulse response is much less than the overall tap length n of the channel impulse response. For such cases, we investigate the inclusion of an active-parameter detection-guided concept within the fast affine projection FIR channel estimator. Simulation results indicate that the proposed detection-guided fast affine projection channel estimator has improved convergence speed and has lead to better steady-state performance than the standard fast affine projection channel estimator, especially in the important case of highly correlated speech input signals.

  16. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  17. The role of handouts, note-taking and overhead transparencies in veterinary science lectures.

    Science.gov (United States)

    McLennan, M W; Isaacs, G

    2002-10-01

    To study student and staff views of the role and use of handouts, note-taking and overhead transparencies in veterinary science lectures at the University of Queensland The Nominal Group Technique was used to help develop a questionnaire, which was completed by 351 students (a response rate of 84%) and 35 staff (76%) from the 5 years of the veterinary course. The data were analysed using the SAS statistical computer package. Staff and students held different views as to the frequency with which handouts should be used, their educational value, and whether they should be complete or partial. Fewer students than staff agreed that handouts discourage further reading in a subject. Almost all staff and students saw the central functions of note-taking to be provision of notes for subsequent revision and encoding information given by the lecturer. More students than staff however, considered that note-taking in lectures interferes with understanding. Staff and students held similar views as to the uses of overheads in lectures. Interestingly however, more staff than students agreed that overheads often contain too much information. Both students and staff saw the central role of note-taking as providing a set of good notes for revision. Generally students preferred that this information be provided in the form of partial or complete handouts, while staff preferred students to take notes and to read outside lectures. Surprisingly, more staff than students felt that overhead transparencies often contained too much information. Note-taking, handouts and overhead transparencies need to be linked in a coherent educational strategy to promote effective learning.

  18. 78 FR 68477 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Science.gov (United States)

    2013-11-14

    ...] Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of... requirements specified in the Standard on Overhead and Gantry Cranes (29 CFR 1910.179). DATES: Comments must be... information (29 U.S.C. 657). The paperwork provisions of the Standard on Overhead and Gantry Cranes specify...

  19. A theoretical model of rain–wind–induced in-plane galloping on overhead transmission tower-lines system

    Directory of Open Access Journals (Sweden)

    Chao Zhou

    2015-09-01

    Full Text Available Rain–wind–induced galloping phenomenon often occurs on overhead transmission tower-lines system, just as icing galloping and vortex-excited vibration; this kind of instability oscillation can cause power-line breakage or tower failure. However, the existing theoretical models of rain–wind–induced galloping are mainly based on the hypothesis of the overhead power-lines with fixed ends, which is inconsistent with the actual operation situation. Therefore, this article thus presents a preliminary theoretical study and proposes a new theoretical model taking into account the effect of tower excitations on the in-plane galloping of the overhead power-line and on the motion of the upper rain-line. The theoretical model is solved by Galerkin method and verified by the comparison with the test data obtained in the available literature involved with the overhead power-lines with fixed towers or moving towers. It turns out that the tower excitations may intensify the in-plane galloping amplitude of the overhead power-line within a certain range of frequency ratio and enable better comprehension of rain–wind–induced galloping mechanism.

  20. A fuzzy-logic antiswing controller for three-dimensional overhead cranes.

    Science.gov (United States)

    Cho, Sung-Kun; Lee, Ho-Hoon

    2002-04-01

    In this paper, a new fuzzy antiswing control scheme is proposed for a three-dimensional overhead crane. The proposed control consists of a position servo control and a fuzzy-logic control. The position servo control is used to control crane position and rope length, and the fuzzy-logic control is used to suppress load swing. The proposed control guarantees not only prompt suppression of load swing but also accurate control of crane position and rope length for simultaneous travel, traverse, and hoisting motions of the crane. Furthermore, the proposed control provides practical gain tuning criteria for easy application. The effectiveness of the proposed control is shown by experiments with a three-dimensional prototype overhead crane.

  1. ZoOHPraxiscope, Re-Inventing the Zoopraxiscope with an Overhead Projector

    Directory of Open Access Journals (Sweden)

    Christian Faubel

    2015-11-01

    Full Text Available The ZoOHPraxiscope is a modified overhead projector that can be used to show cinematographic animations. It allows blending and mixing of animated shadow play with cinematographic animation. Similar to the Zoopraxiscope that was developed by the photographer Eadweard Muybridge in the 19th century, the ZoOHPraxiscope combines a rotating picture disc with a Laterna Magica and shutter mechanism. The mechanical shutter of the original device is replaced by a high-power LED that can be turned on and off at the fraction of a second. The overhead projector acts as Laterna Magica. This new device is used as a performance instrument to combine sound, vision, shadow play and animation.

  2. Problems due to icing of overhead lines - Part II

    International Nuclear Information System (INIS)

    Havard, D.G.; Pon, C.J.; Krishnasamy, S.G.

    1985-01-01

    A companion paper describes uncertainties in overhead line design due to the variability of ice and wind loads. This paper reviews two other effects due to icing; conductor galloping and torsional instability, which require further study. (author)

  3. Lightning Performance on Overhead Distribution Lines : After Improvement Field Observation

    Directory of Open Access Journals (Sweden)

    Reynaldo Zoro

    2009-11-01

    Full Text Available Two feeders of 20 kV overhead distribution lines which are located in a high lightning density area are chosen to be observed as a field study due to their good lightning performance after improvement of lightning protection system. These two feeders used the new overhead ground wire and new line arrester equipped with lightning counter on the main lines. The significant reduced of lines outages are reported. Study was carried out to observe these improvements by comparing to the other two feeders line which are not improved and not equipped yet with the ground wire and line arrester. These two feeders located in the nearby area. Two cameras were installed to record the trajectory of the lightning strikes on the improved lines. Lightning peak currents are measured using magnetic tape measurement system installed on the grounding lead of lightning arrester. Lightning overvoltage calculations are carried out by using several scenarios based on observation results and historical lightning data derived from lightning detection network. Lightning overvoltages caused by indirect or direct strikes are analyzed to get the lightning performance of the lines. The best scenario was chosen and performance of the lines were improved significantly by installing overhead ground wire and improvement of lightning arrester installation.

  4. Removal of the Materials Test Reactor overhead working reservoir

    International Nuclear Information System (INIS)

    Lunis, B.C.

    1975-10-01

    Salient features of the removal of an excessed contaminated facility, the Materials Test Reactor (MTR) overhead working reservoir (OWR) from the Test Reactor Area to the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory are described. The 125-ton OWR was an overhead 160,000-gallon-capacity tank approximately 193 feet high which supplied cooling water to the MTR. Radiation at ground level beneath the tank was 5 mR/hr and approximately 600 mR/hr at the exterior surface of the tank. Sources ranging from 3 R/hr to in excess of 500 R/hr exist within the tank. The tank interior is contaminated with uranium, plutonium, and miscellaneous fission products. The OWR was lowered to ground level with the use of explosive cutters. Dismantling, decontamination, and disposal were performed by Aerojet Nuclear Company maintenance forces

  5. Kinetic parameter estimation from attenuated SPECT projection measurements

    International Nuclear Information System (INIS)

    Reutter, B.W.; Gullberg, G.T.

    1998-01-01

    Conventional analysis of dynamically acquired nuclear medicine data involves fitting kinetic models to time-activity curves generated from regions of interest defined on a temporal sequence of reconstructed images. However, images reconstructed from the inconsistent projections of a time-varying distribution of radiopharmaceutical acquired by a rotating SPECT system can contain artifacts that lead to biases in the estimated kinetic parameters. To overcome this problem the authors investigated the estimation of kinetic parameters directly from projection data by modeling the data acquisition process. To accomplish this it was necessary to parametrize the spatial and temporal distribution of the radiopharmaceutical within the SPECT field of view. In a simulated transverse slice, kinetic parameters were estimated for simple one compartment models for three myocardial regions of interest, as well as for the liver. Myocardial uptake and washout parameters estimated by conventional analysis of noiseless simulated data had biases ranging between 1--63%. Parameters estimated directly from the noiseless projection data were unbiased as expected, since the model used for fitting was faithful to the simulation. Predicted uncertainties (standard deviations) of the parameters obtained for 500,000 detected events ranged between 2--31% for the myocardial uptake parameters and 2--23% for the myocardial washout parameters

  6. Operational overhead of moving to higher energies

    CERN Document Server

    Lamont, M

    2011-01-01

    The operational overheads of moving above 3.5 TeV are examined. The costs of performing such a move at the start, or during, the 2011 run are evaluated. The impact of operation with beams above 3.5 TeV on machine protection systems is briefly reviewed, and any potential limitations are enumerated. Finally the possible benefits of increasing the beam energy on the luminosity are discussed.

  7. Do overhead sports increase risk for rotator cuff tears in wheelchair users?

    Science.gov (United States)

    Akbar, Michael; Brunner, Manuela; Ewerbeck, Volker; Wiedenhöfer, Bernd; Grieser, Thomas; Bruckner, Thomas; Loew, Markus; Raiss, Patric

    2015-03-01

    To analyze whether frequent overhead-sports activity increases the risk for rotator cuff disease in patients with spinal cord injuries (SCIs) who are wheelchair dependent. Cross-sectional study, risk analysis. Department of Orthopaedic Surgery, Trauma Surgery and Spinal Cord Injury. Patients (N=296) with SCI requiring the full-time use of a manual wheelchair were recruited for this study. The total population was divided into 2 groups (sports vs no sports), among them 103 patients playing overhead sports on a regular basis (at least 1-2 times/wk) and 193 patients involved in overhead sports less than once a week or in no sports activity at all. The mean age of the sports group was 49.1 years. The mean duration of wheelchair dependence was 26.5 years. The mean age of the no-sports group was 48 years. The mean duration of wheelchair dependence was 25.2 years. Each individual completed a questionnaire designed to identify overhead-sports activity on a regular basis and was asked about shoulder problems. Magnetic resonance imaging scans of both shoulders were performed in each patient and analyzed in a standardized fashion. None. Possible differences in continuous data between patients with and without rotator cuff tear were evaluated. The relative risk of suffering from a rotator cuff tear between patients playing overhead sports and those not playing overhead sports was calculated. One hundred three patients played overhead sports regularly and 193 did not. There was no difference between groups regarding age, sex, level of SCI, and duration of wheelchair dependence. The body mass index was significantly lower in the sports group than in the no-sports group (Psports group and in 36.3% of the patients in the no-sports group (Psports group to develop rotator cuff tears was twice as high as for the no-sports group (95% confidence interval, 1.7-2.6; Psports activities have been identified as an additional risk factor, along with age and duration of wheelchair dependence

  8. An Issue of Boundary Value for Velocity and Training Overhead Using Cooperative MIMO Technique in Wireless Sensor Network

    Directory of Open Access Journals (Sweden)

    M. R. Islam

    2011-06-01

    Full Text Available A boundary value of velocity of data gathering node (DGN and a critical value for training overhead beyond which the cooperative communication in wireless sensor network will not be feasible is proposed in this paper. Multiple Input Multiple Outputs (MIMO cooperative communication is taken as an application. The performance in terms of energy efficiency and delay for a combination of two transmitting and two receiving antennas is analyzed. The results show that a set of critical value of velocity and training overhead pair is present for the long haul communication from the sensors to the data gathering node. Later a graphical relation between boundary value of training overhead and velocity is simulated. A mathematical relation between velocity and training overhead is also developed. The effects of several parameters on training overhead and velocity are analyzed.

  9. Comparison between IEEE and CIGRE Thermal Behaviour Standards and Measured Temperature on a 132-kV Overhead Power Line

    Directory of Open Access Journals (Sweden)

    Alberto Arroyo

    2015-12-01

    Full Text Available This paper presents the steady and dynamic thermal balances of an overhead power line proposed by CIGRE (Technical Brochure 601, 2014 and IEEE (Std.738, 2012 standards. The estimated temperatures calculated by the standards are compared with the averaged conductor temperature obtained every 8 min during a year. The conductor is a LA 280 Hawk type, used in a 132-kV overhead line. The steady and dynamic state comparison shows that the number of cases with deviations to conductor temperatures higher than 5 ∘ C decreases from around 20% to 15% when the dynamic analysis is used. As some of the most critical variables are magnitude and direction of the wind speed, ambient temperature and solar radiation, their influence on the conductor temperature is studied. Both standards give similar results with slight differences due to the different way to calculate the solar radiation and convection. Considering the wind, both standards provide better results for the estimated conductor temperature as the wind speed increases and the angle with the line is closer to 90 ∘ . In addition, if the theoretical radiation is replaced by that measured with the pyranometer, the number of samples with deviations higher than 5 ∘ C is reduced from around 15% to 5%.

  10. Optimization of the box-girder of overhead crane with constrained ...

    African Journals Online (AJOL)

    haroun

    Keywords: Overhead crane - Box-girder - New bat algorithm - level of ... much more efficiency and robustness compared to the genetic algorithm (GA) and PSO ...... optimization: developments, applications and resources," in Evolutionary.

  11. Reduction of the visual impact of overhead transmission line systems through utilisation of line surge arresters as lightning protection

    DEFF Research Database (Denmark)

    Sørensen, Thomas Kjærsgaard; Holbøll, Joachim

    2008-01-01

    with the Technical University of Denmark, on how to lessen the visual impact of 400 kV overhead line transmission systems. In this paper omission of shield wires combined with installation of a suitable number of line surge arresters is investigated as a possible alternative to transmission lines equipped...... with shielding wires thereby reducing tower height, allowing more compact designs of towers thus minimizing the visual environment impact of the lines. Omission of shield wires in the system and instead utilizing a larger number of surge arresters in the (upper) phases of an overhead line without reduction...... will be investigated by transient simulations on a 400 kV line with either shield wires or line surge arresters. These simulations will also be used to estimate number and location of the line surge arresters in the line to ensure a satisfactory performance of the line when omitting shield wires in the tower top...

  12. Kinetic parameter estimation from SPECT cone-beam projection measurements

    International Nuclear Information System (INIS)

    Huesman, Ronald H.; Reutter, Bryan W.; Zeng, G. Larry; Gullberg, Grant T.

    1998-01-01

    Kinetic parameters are commonly estimated from dynamically acquired nuclear medicine data by first reconstructing a dynamic sequence of images and subsequently fitting the parameters to time-activity curves generated from regions of interest overlaid upon the image sequence. Biased estimates can result from images reconstructed using inconsistent projections of a time-varying distribution of radiopharmaceutical acquired by a rotating SPECT system. If the SPECT data are acquired using cone-beam collimators wherein the gantry rotates so that the focal point of the collimators always remains in a plane, additional biases can arise from images reconstructed using insufficient, as well as truncated, projection samples. To overcome these problems we have investigated the estimation of kinetic parameters directly from SPECT cone-beam projection data by modelling the data acquisition process. To accomplish this it was necessary to parametrize the spatial and temporal distribution of the radiopharmaceutical within the SPECT field of view. In a simulated chest image volume, kinetic parameters were estimated for simple one-compartment models for four myocardial regions of interest. Myocardial uptake and washout parameters estimated by conventional analysis of noiseless simulated cone-beam data had biases ranging between 3-26% and 0-28%, respectively. Parameters estimated directly from the noiseless projection data were unbiased as expected, since the model used for fitting was faithful to the simulation. Statistical uncertainties of parameter estimates for 10 000 000 events ranged between 0.2-9% for the uptake parameters and between 0.3-6% for the washout parameters. (author)

  13. Tracing overhead transmission line corridors with regard to environmental and spatial qualities

    Directory of Open Access Journals (Sweden)

    Alenka Cof

    2005-01-01

    Full Text Available The article deals with possibilities for running the proposed overhead transmission line Okroglo-Italian border. The Slovene and Italian methods are shown as methods enabling consideration of environmental and spatial impact within the process of planning overhead transmission line corridors. The Slovene method consists of analyses of attractiveness and vulnerability, whereby the first considers those functional and economic factors that affect spatial attractiveness for overhead transmission lines. Thus we can assess the level of economic and functional suitability of alternative routes of the proposed 400 kilovolt overhead transmission line from transformation station Okroglo (Slovenia to Srednje, Golo Brdo and Vrtojba, three potential contact points on the Slovene–Italian border. In accordance with stipulations of the Law on spatial management vulnerability models were prepared, which were used to simulate the development’s potential negative environmental effects and to analyse suitability, which implies harmonisation of development and protection demands. Their result is a possible corridor that can be developed without significant conflicts. The Italian procedure was developed to trace the transmission line corridor from the Slovenian border to the transformation station in Udine. It was also applied on the Slovenian side. Three groups of factors were considered in the procedure: exclusion, repulsion, and attraction. The much simpler procedure enables comparisons, since it uses the same or at least similar spatial data. In conclusion a short commentary is added about the corridor concept as a planning tool.

  14. Authentication and consensus overhead in vehicular ad hoc networks

    NARCIS (Netherlands)

    Petit, Jonathan; Mammeri, Zoubir

    Vehicular ad hoc networks aim at increasing passenger safety by exchanging warning messages between vehicles wirelessly. A main challenge is to resist to various malicious abuses and security attacks. However, any security mechanism comes with overhead. We analyze how the authentication algorithm

  15. Human Factors Engineering Guidelines for Overhead Cranes

    Science.gov (United States)

    Chandler, Faith; Delgado, H. (Technical Monitor)

    2001-01-01

    This guideline provides standards for overhead crane cabs that can be applied to the design and modification of crane cabs to reduce the potential for human error due to design. This guideline serves as an aid during the development of a specification for purchases of cranes or for an engineering support request for crane design modification. It aids human factors engineers in evaluating existing cranes during accident investigations or safety reviews.

  16. Methodology for cost estimate in projects for nuclear power plants decommissioning

    International Nuclear Information System (INIS)

    Salij, L.M.

    2008-01-01

    The conceptual approaches to cost estimating of nuclear power plants units decommissioning projects were determined. The international experience and national legislative and regulatory basis were analyzed. The possible decommissioning project cost classification was given. It was shown the role of project costs of nuclear power plant units decommissioning as the most important criterion for the main project decisions. The technical and economic estimation of deductions to common-branch fund of decommissioning projects financing was substantiated

  17. Communication overhead on the Intel Paragon, IBM SP2 and Meiko CS-2

    Science.gov (United States)

    Bokhari, Shahid H.

    1995-01-01

    Interprocessor communication overhead is a crucial measure of the power of parallel computing systems-its impact can severely limit the performance of parallel programs. This report presents measurements of communication overhead on three contemporary commercial multicomputer systems: the Intel Paragon, the IBM SP2 and the Meiko CS-2. In each case the time to communicate between processors is presented as a function of message length. The time for global synchronization and memory access is discussed. The performance of these machines in emulating hypercubes and executing random pairwise exchanges is also investigated. It is shown that the interprocessor communication time depends heavily on the specific communication pattern required. These observations contradict the commonly held belief that communication overhead on contemporary machines is independent of the placement of tasks on processors. The information presented in this report permits the evaluation of the efficiency of parallel algorithm implementations against standard baselines.

  18. Estimating the cost of healthcare delivery in three hospitals in southern ghana.

    Science.gov (United States)

    Aboagye, A Q Q; Degboe, A N K; Obuobi, A A D

    2010-09-01

    The cost burden (called full cost) of providing health services at a referral, a district and a mission hospital in Ghana were determined. Standard cost-finding and cost analysis tools recommended by World Health Organization are used to analyse 2002 and 2003 hospital data. Full cost centre costs were computed by taking into account cash and non-cash expenses and allocating overhead costs to intermediate and final patient care centres. The full costs of running the mission hospital in 2002 and 2003 were US$600,295 and US$758,647 respectively; for the district hospital, the respective costs were US$496,240 and US$487,537; and for the referral hospital, the respective costs were US$1,160,535 and US$1,394,321. Of these, overhead costs ranged between 20% and 42%, while salaries made up between 45% and 60%. Based on healthcare utilization data, in 2003 the estimated cost per outpatient attendance was US$ 2.25 at the mission hospital, US$ 4.51 at the district hospital and US$8.5 at the referral hospital; inpatient day costs were US$ 6.05, US$ 9.95 and US$18.8 at the respective hospitals. User fees charged at service delivery points were generally below cost. However, some service delivery points have the potential to recover their costs. Salaries are the major cost component of the three hospitals. Overhead costs constitute an important part of hospital costs and must be noted in efforts to recover costs. Cost structures are different at different types of hospitals. Unit costs at service delivery points can be estimated and projected into the future.

  19. Composite Extension Finite Fields for Low Overhead Network Coding

    DEFF Research Database (Denmark)

    Heide, Janus; Roetter, Daniel Enrique Lucani

    2015-01-01

    Although Network Coding (NC) has been proven to increase throughput and reliability in communication networks, its adoption is typically hindered by the additional complexity it introduces at various nodes in the network and the overhead to signal the coding coefficients associated with each code...

  20. 23 CFR 140.907 - Overhead and indirect construction costs.

    Science.gov (United States)

    2010-04-01

    ... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...

  1. Further Research on an Anti-Swing Control System for Overhead Cranes

    Directory of Open Access Journals (Sweden)

    B. Spruogis

    2018-02-01

    Full Text Available A method of reducing load oscillations that occur when overhead crane reaches destination position is presented in the article. The use of control drive scheme of crane bridge and trolley that ensures a smooth phase trajectory transition of the load to the optimum trajectory in accordance with Pontryagin's maximum principle is proposed. Mentioned control system changes the magnitude or direction of the traction force at the moment when the load is located above the destination. It is found that the degree of change of the traction force depends on the hoisting rope deviation angle from vertical. This study was conducted in order to provide more accurate and fast handling of loads by overhead crane.

  2. Compilation time analysis to minimize run-time overhead in preemptive scheduling on multiprocessors

    Science.gov (United States)

    Wauters, Piet; Lauwereins, Rudy; Peperstraete, J.

    1994-10-01

    This paper describes a scheduling method for hard real-time Digital Signal Processing (DSP) applications, implemented on a multi-processor. Due to the very high operating frequencies of DSP applications (typically hundreds of kHz) runtime overhead should be kept as small as possible. Because static scheduling introduces very little run-time overhead it is used as much as possible. Dynamic pre-emption of tasks is allowed if and only if it leads to better performance in spite of the extra run-time overhead. We essentially combine static scheduling with dynamic pre-emption using static priorities. Since we are dealing with hard real-time applications we must be able to guarantee at compile-time that all timing requirements will be satisfied at run-time. We will show that our method performs at least as good as any static scheduling method. It also reduces the total amount of dynamic pre-emptions compared with run time methods like deadline monotonic scheduling.

  3. Estimating design costs for first-of-a-kind projects

    International Nuclear Information System (INIS)

    Banerjee, Bakul; Fermilab

    2006-01-01

    Modern scientific facilities are often outcomes of projects that are first-of-a-kind, that is, minimal historical data are available for project costs and schedules. However, at Fermilab, there was an opportunity to execute two similar projects consecutively. In this paper, a comparative study of the design costs for these two projects is presented using earned value methodology. This study provides some insights into how to estimate the cost of a replicated project

  4. 48 CFR 3452.216-71 - Negotiated overhead rates-fixed.

    Science.gov (United States)

    2010-10-01

    ... acceptability of cost allocation methods shall be determined in accordance with part 31 of the Federal... different period, for which the rates apply, and (4) the specific items treated as direct costs or any changes in the items previously agreed to be direct costs. (e) Pending establishment of fixed overhead...

  5. IMPROVING PROJECT SCHEDULE ESTIMATES USING HISTORICAL DATA AND SIMULATION

    Directory of Open Access Journals (Sweden)

    P.H. Meyer

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Many projects are not completed on time or within the original budget. This is caused by uncertainty in project variables as well as the occurrence of risk events. A study was done to determine ways of measuring the risk in development projects executed by a mining company in South Africa. The main objective of the study was to determine whether historical project data would provide a more accurate means of estimating the total project duration. Original estimates and actual completion times for tasks of a number of projects were analysed and compared. The results of the study indicated that a more accurate total duration for a project could be obtained by making use of historical project data. The accuracy of estimates could be improved further by building a comprehensive project schedule database within a specific industry.

    AFRIKAANSE OPSOMMING: Verskeie projekte word nie binne die oorspronklike skedule of begroting voltooi nie. Dit word dikwels veroorsaak deur onsekerheid oor projekveranderlikes en die voorkoms van risiko’s. 'n Studie is gedoen om 'n metode te ontwikkel om risiko te meet vir ontwikkelingsprojekte van 'n mynmaatskappy in Suid Afrika. Die hoofdoel van die studie was om te bepaal of historiese projekdata gebruik kon word om 'n akkurater tydsduur vir 'n projek te beraam. Die geraamde tydsduur van take vir 'n aantal projekte is ontleed en vergelyk met die werklike tydsduur. Die resultate van die studie het getoon dat 'n akkurater totale tydsduur vir die projek verkry kon word deur gebruik te maak van historiese projekdata. Die akkuraatheid kan verder verbeter word deur 'n databasis van projekskedules vir 'n bepaalde industrie te ontwikkel en by datum te hou.

  6. ESTIMATION CRITERIA OF INVESTMENT INNOVATIVE PROJECTS IN HEALTHCARE SPHERE

    OpenAIRE

    Vadim A. Lomazov; Elena V. Nesterova

    2013-01-01

    The problem of evaluating investment projects in the health sector, implemented on a public-private partnership, is considered. As part of the procedure for constructing estimates is suggested to reveal medical, social, economic, scientific and innovative components of the project as a separate component of the project to be used as the analytic hierarchy subcriteria.

  7. Thresholding projection estimators in functional linear models

    OpenAIRE

    Cardot, Hervé; Johannes, Jan

    2010-01-01

    We consider the problem of estimating the regression function in functional linear regression models by proposing a new type of projection estimators which combine dimension reduction and thresholding. The introduction of a threshold rule allows to get consistency under broad assumptions as well as minimax rates of convergence under additional regularity hypotheses. We also consider the particular case of Sobolev spaces generated by the trigonometric basis which permits to get easily mean squ...

  8. Parametric Cost Estimates for an International Competitive Edge

    International Nuclear Information System (INIS)

    Murphy, L.T.; Hickey, M.

    2006-01-01

    This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioning projects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must be sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of international monetary exchange, currency fluctuations and contingency. The development of a parametric cost estimating capability is also a key component in building a forward estimating strategy. The forward estimating strategy will enable the preparation of accurate and cost-effective out-year estimates, even when work scope is poorly defined or as yet indeterminate. Preparation of cost estimates for work outside the organizations current sites, for which detailed measurement is not possible and historical cost data does not exist, will also be facilitated. (authors)

  9. ESTIMATION CRITERIA OF INVESTMENT INNOVATIVE PROJECTS IN HEALTHCARE SPHERE

    Directory of Open Access Journals (Sweden)

    Vadim A. Lomazov

    2013-01-01

    Full Text Available The problem of evaluating investment projects in the health sector, implemented on a public-private partnership, is considered. As part of the procedure for constructing estimates is suggested to reveal medical, social, economic, scientific and innovative components of the project as a separate component of the project to be used as the analytic hierarchy subcriteria.

  10. General risks for tunnelling projects: An overview

    Science.gov (United States)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  11. Discriminating Projections for Estimating Face Age in Wild Images

    Energy Technology Data Exchange (ETDEWEB)

    Tokola, Ryan A [ORNL; Bolme, David S [ORNL; Ricanek, Karl [ORNL; Barstow, Del R [ORNL; Boehnen, Chris Bensing [ORNL

    2014-01-01

    We introduce a novel approach to estimating the age of a human from a single uncontrolled image. Current face age estimation algorithms work well in highly controlled images, and some are robust to changes in illumination, but it is usually assumed that images are close to frontal. This bias is clearly seen in the datasets that are commonly used to evaluate age estimation, which either entirely or mostly consist of frontal images. Using pose-specific projections, our algorithm maps image features into a pose-insensitive latent space that is discriminative with respect to age. Age estimation is then performed using a multi-class SVM. We show that our approach outperforms other published results on the Images of Groups dataset, which is the only age-related dataset with a non-trivial number of off-axis face images, and that we are competitive with recent age estimation algorithms on the mostly-frontal FG-NET dataset. We also experimentally demonstrate that our feature projections introduce insensitivity to pose.

  12. Lightning simulation of a combined overhead line/cable connected GIS

    DEFF Research Database (Denmark)

    Kessel, Jakob; Atlason, Vioir; Bak, Claus Leth

    2008-01-01

    performance, compared to a system consisting solely of AIS connected thorugh overhead lines. The main purpose is to investigate whether overvoltage protection is necessary at the GIS busbar. Here, the price for a GIS SA is significantly more expensive than the price for an AIS SA. The analysis is conducted......The paper concerns different investigations of lightning simulation of a combined 170 kV overhead line/cable connected GIS. This is interesting due to the increasing amount of underground cables and GIS in the Danish transmission system. This creates a different system with respect to lightning...... by implementing a simulation model in PSCAD/EMTDC. Simulations are conducted for both SF and BFO where the overvoltage at the transformer are evaluated as this component has the lowest insulation strength. The overvoltages are evaluated for different front imes of the lightning surge, different soil resistivities...

  13. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  14. Software project estimation the fundamentals for providing high quality information to decision makers

    CERN Document Server

    Abran, Alain

    2015-01-01

    Software projects are often late and over-budget and this leads to major problems for software customers. Clearly, there is a serious issue in estimating a realistic, software project budget. Furthermore, generic estimation models cannot be trusted to provide credible estimates for projects as complex as software projects. This book presents a number of examples using data collected over the years from various organizations building software. It also presents an overview of the non-for-profit organization, which collects data on software projects, the International Software Benchmarking Stan

  15. Asbestos fiber release from the brake pads of overhead industrial cranes.

    Science.gov (United States)

    Spencer, J W; Plisko, M J; Balzer, J L

    1999-06-01

    The purpose of this evaluation was to determine the actual contribution of airborne asbestos fibers to the work environment from the operation of overhead cranes and hoists that use asbestos composition brake pads. The evaluation was conducted in a working manufacturing facility. Other potential sources of asbestos were accounted for by visual inspection and background air monitoring. An overhead crane assembly comprised of a trolley and two hoists was employed for this study. The crane was operated for two consecutive eight-hour shifts representative of a heavy-duty cycle. Forty-four personal and area air samples were collected during the assessment. Asbestos fibers were analyzed for by phase contrast (NIOSH 7400), and transmission electron (NIOSH 7402) microscopy methods. Eight-hour time-weighted average (TWA) asbestos fiber concentrations ranged from cranes.

  16. Towers of the new 380 kV high-voltage overhead line across the Elbe

    Energy Technology Data Exchange (ETDEWEB)

    Kiessling, F; Sperl, H D; Wagemann, F

    1979-11-01

    As part of the European power transmission line between North Sweden and Southern Italy, a 380 kV rotary-current overhead line crosses the Elbe river south of Hamburg. To achieve the overhead clearance of 80 m required for navigation and the maximum line sag of 85 m, two steel trelliswork towers were constructed about 1200 m apart, each of them 227 m high. The 12 phases (cables) of the line are suspended each on three horizontal beams at a horizontal distance of 16 m. Exceptional loads far beyond the standards set in VDE 0210/5.69 have been assumed for the layout. In the case of the wind loads the frequent gales had to be considered; for ice loads, class I of the IEC/TC 11 Draft on Ice loading on Overhead Lines . Amsterdam 1977, was assumed. Some further loads are described as well as the tender procedure, supply and assembly of the towers.

  17. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  18. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  19. Wireless overhead line temperature sensor based on RF cavity resonance

    International Nuclear Information System (INIS)

    Ghafourian, Maryam; Nezhad, Abolghasem Zeidaabadi; Bridges, Greg E; Thomson, Douglas J

    2013-01-01

    The importance of maximizing power transfer through overhead transmission lines necessitates the use of dynamic power control to keep transmission line temperatures within acceptable limits. Excessive conductor operating temperatures lead to an increased sag of the transmission line conductor and may reduce their expected life. In this paper, a passive wireless sensor based on a resonant radio frequency (RF) cavity is presented which can be used to measure overhead transmission line temperature. The temperature sensor does not require a power supply and can be easily clamped to the power line with an antenna attached. Changing temperature causes a change of cavity dimensions and a shift in resonant frequency. The resonant frequency of the cavity can be interrogated wirelessly. This temperature sensor has a resolution of 0.07 °C and can be interrogated from distances greater than 4.5 m. The sensor has a deviation from linearity of less than 2 °C. (paper)

  20. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  1. Designing concept on lightning protection of overhead power distribution line

    Energy Technology Data Exchange (ETDEWEB)

    Yokoyama, Shigeru [Central Research Institute of Electric Power Industry, Kanagawa-ken (Japan)], E-mail: yokoyama@criepi.denken.or.jp

    2007-07-01

    The principle is shown for lightning protection of power distribution lines taking the effects of surge arresters, overhead ground wires and their combined use into consideration. Moreover an outline of a rational design method targeting direct lightning hits, induced over voltages and back flow currents from high structures. (author)

  2. Reliance on and Reliability of the Engineer’s Estimate in Heavy Civil Projects

    Directory of Open Access Journals (Sweden)

    George Okere

    2017-06-01

    Full Text Available To the contractor, the engineer’s estimate is the target number to aim for, and the basis for a contractor to evaluate the accuracy of their estimate. To the owner, the engineer’s estimate is the basis for funding, evaluation of bids, and for predicting project costs. As such the engineer’s estimate is the benchmark. This research sought to investigate the reliance on, and the reliability of the engineer’s estimate in heavy civil cost estimate. The research objective was to characterize the engineer’s estimate and allow owners and contractors re-evaluate or affirm their reliance on the engineer’s estimate. A literature review was conducted to understand the reliance on the engineer’s estimate, and secondary data from Washington State Department of Transportation was used to investigate the reliability of the engineer’s estimate. The findings show the need for practitioners to re-evaluate their reliance on the engineer’s estimate. The empirical data showed that, within various contexts, the engineer’s estimate fell outside the expected accuracy range of the low bids or the cost to complete projects. The study recommends direct tracking of costs by project owners while projects are under construction, the use of a second estimate to improve the accuracy of their estimates, and use of the cost estimating practices found in highly reputable construction companies.

  3. Communication overhead on the Intel iPSC-860 hypercube

    Science.gov (United States)

    Bokhari, Shahid H.

    1990-01-01

    Experiments were conducted on the Intel iPSC-860 hypercube in order to evaluate the overhead of interprocessor communication. It is demonstrated that: (1) contrary to popular belief, the distance between two communicating processors has a significant impact on communication time, (2) edge contention can increase communication time by a factor of more than 7, and (3) node contention has no measurable impact.

  4. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  5. Solid Waste Operations Complex W-113: Project cost estimate. Preliminary design report. Volume IV

    International Nuclear Information System (INIS)

    1995-01-01

    This document contains Volume IV of the Preliminary Design Report for the Solid Waste Operations Complex W-113 which is the Project Cost Estimate and construction schedule. The estimate was developed based upon Title 1 material take-offs, budgetary equipment quotes and Raytheon historical in-house data. The W-113 project cost estimate and project construction schedule were integrated together to provide a resource loaded project network

  6. Estimating the greenhouse gas benefits of forestry projects: A Costa Rican Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Busch, Christopher; Sathaye, Jayant; Sanchez Azofeifa, G. Arturo

    2000-09-01

    If the Clean Development Mechanism proposed under the Kyoto Protocol is to serve as an effective means for combating global climate change, it will depend upon reliable estimates of greenhouse gas benefits. This paper sketches the theoretical basis for estimating the greenhouse gas benefits of forestry projects and suggests lessons learned based on a case study of Costa Rica's Protected Areas Project, which is a 500,000 hectare effort to reduce deforestation and enhance reforestation. The Protected Areas Project in many senses advances the state of the art for Clean Development Mechanism-type forestry projects, as does the third-party verification work of SGS International Certification Services on the project. Nonetheless, sensitivity analysis shows that carbon benefit estimates for the project vary widely based on the imputed deforestation rate in the baseline scenario, e.g. the deforestation rate expected if the project were not implemented. This, along with a newly available national dataset that confirms other research showing a slower rate of deforestation in Costa Rica, suggests that the use of the 1979--1992 forest cover data originally as the basis for estimating carbon savings should be reconsidered. When the newly available data is substituted, carbon savings amount to 8.9 Mt (million tones) of carbon, down from the original estimate of 15.7 Mt. The primary general conclusion is that project developers should give more attention to the forecasting land use and land cover change scenarios underlying estimates of greenhouse gas benefits.

  7. Optimization of the box-girder of overhead crane with constrained ...

    African Journals Online (AJOL)

    Keywords: Overhead crane - Box-girder - New bat algorithm - level of comparison - Higher strength steel. Optimisation de poutre caisson de pont roulant avec un nouvel algorithme de chauve souris sous contrainte. Une conception optimale pour un poids minimal de la poutre principale d'un pont roulant peut réduire ...

  8. A modified earned value management using activity based costing

    Directory of Open Access Journals (Sweden)

    Vahid Aminian

    2016-12-01

    Full Text Available Earned Value Management (EVM has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project perfor-mance. This system relies on a set of often straightforward metrics to measure and evaluate the general health of a project. These metrics serve as early warning signals to timely detect project problems, or to exploit project opportunities. A key aspect of EVM is to estimate the completion cost of a project by considering both cost and schedule performance indices. However, good performance of cost and schedule performance indices does not necessarily guarantee cost effec-tiveness of the project regardless of the overhead costs. The reason is because, in most project-based organizations, overhead costs constitute a significant proportion of the total costs. Howev-er, EVM indices are usually calculated in the absence of the so-called overhead costs. This paper, first, seeks to remedy this problem by proposing a practical procedure of allocating overhead costs in project-based organizations. Then the traditional EVM indices are revised by consider-ing the allocated overhead costs. Finally, a case study demonstrates the applicability of the pro-posed method for a real-life project.

  9. Structural Design of Two-Cylinder Single Overhead Camshaft

    Science.gov (United States)

    Zhao, Yuxia; Zhang, Kangsheng; Di, Jiejian

    2018-01-01

    Due to the higher performance demand, the camshaft is the key driving part in the engine. Because it is eccentric circular section part, it is very difficult to design and manufacture this kind of axial parts. Take two-cylinder single overhead camshaft for an example, the entire process of camshaft design is analyzed. The practice has proved that the method has simple, flexible and efficient advantages, and it can greatly shorten the design of artificial computing time.

  10. 75 FR 44288 - Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of...

    Science.gov (United States)

    2010-07-28

    ...] Overhead and Gantry Cranes; Extension of the Office of Management and Budget's (OMB) Approval of... requirements specified in the Standard on Overhead and Gantry Cranes (29 CFR 1910.179). DATES: Comments must be... requirements for: Marking the rated load of cranes; preparing certification records to verify the inspection of...

  11. Uptake and Accumulation of Pharmaceuticals in Lettuce Under Surface and Overhead Irrigations

    Science.gov (United States)

    Bhalsod, G.; Chuang, Y. H.; Jeon, S.; Gui, W.; Li, H.; Guber, A.; Zhang, W.

    2015-12-01

    Pharmaceuticals and personal care products are being widely detected in wastewater and surface waters. As fresh water becomes scarcer, interests in using reclaimed water for crop irrigation is intensified. Since reclaimed waters often carry trace levels of pharmaceuticals, accumulation of pharmaceuticals in food crops could increase the risk of human exposure. This study aims to investigate uptake and accumulations of pharmaceuticals in greenhouse-grown lettuce under contrasting irrigation practices (i.e., overhead and surface irrigations). Lettuce was irrigated with water spiked with 11 commonly used pharmaceuticals (acetaminophen, caffeine, carbamazepine, sulfadiazine, sulfamethoxazole, carbadox, trimethoprim, lincomycin hydrochloride, oxytetracycline hydrochloride, monensin sodium, and tylosin). Weekly sampling of lettuce roots, shoots, and soils were continued for 5 weeks, and the samples were freeze dried, extracted for pharmaceuticals and analyzed by LC-MS/MS. Preliminary results indicate that higher concentrations of pharmaceuticals were found in overhead irrigated lettuce compared to surface irrigated lettuce. For carbamezapine, sulfadiazine, trimethoprim, oxytetracycline, and monensin sodium, their concentrations generally increased in lettuce shoots in the overhead treatment over time. However, acetaminophen was found at higher concentrations in both shoots and roots, indicating that acetaminophen can be easily transported in the plant system. This study provides insight on developing better strategies for using reclaimed water for crop irrigations, while minimizing the potential risks of pharmaceutical contamination of vegetables.

  12. Solid Modeling and Finite Element Analysis of an Overhead Crane Bridge

    Directory of Open Access Journals (Sweden)

    C. Alkin

    2005-01-01

    Full Text Available The design of an overhead crane bridge with a double box girder has been investigated and a case study of a crane with 35 ton capacity and 13 m span length has been conducted. In the initial phase of the case study, conventional design calculations proposed by F. E. M. Rules and DIN standards were performed to verify the stress and deflection levels. The crane design was modeled using both solids and surfaces. Finite element meshes with 4-node tetrahedral and 4-node quadrilateral shell elements were generated from the solid and shell models, respectively. After a comparison of the finite element analyses, the conventional calculations and performance of the existing crane, the analysis with quadratic shell elements was found to give the most realistic results. As a result of this study, a design optimization method for an overhead crane is proposed. 

  13. A low-latency, low-overhead encoder for data transmission in the ATLAS Liquid Argon Calorimeter trigger upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Xiao, Le [Department of Physics, Central China Normal University, Wuhan, Hubei 430079 (China); Department of Physics, Southern Methodist University, Dallas, TX 75275 (United States); Li, Xiaoting [Department of Physics, Central China Normal University, Wuhan, Hubei 430079 (China); Gong, Datao, E-mail: dgong@mail.smu.edu [Department of Physics, Southern Methodist University, Dallas, TX 75275 (United States); Chen, Jinghong [Department of Electrical and Computer Engineering, University of Houston, Houston, TX 77004 (United States); Deng, Binwei [School of Electric and Electronic Information Engineering, Hubei Polytechnic University, Huangshi, Hubei 435003 (China); Fan, Qingjun; Feng, Yulang [Department of Electrical and Computer Engineering, University of Houston, Houston, TX 77004 (United States); Guo, Di [Department of Physics, Southern Methodist University, Dallas, TX 75275 (United States); State Key Laboratory of Particle Detection and Electronics, University of Science and Technology of China, Hefei, Anhui 230026 (China); He, Huiqin [Department of Physics, Central China Normal University, Wuhan, Hubei 430079 (China); Department of Physics, Southern Methodist University, Dallas, TX 75275 (United States); Shenzhen Polytechnic, Shenzhen 518055 (China); Hou, Suen [Institute of Physics, Academia Sinica, Nangang 11529, Taipei, Taiwan (China); Huang, Guangming, E-mail: gmhuang@phy.ccnu.edu.cn [Department of Physics, Central China Normal University, Wuhan, Hubei 430079 (China); Liu, Chonghan; Liu, Tiankuan [Department of Physics, Southern Methodist University, Dallas, TX 75275 (United States); Sun, Xiangming [Department of Physics, Central China Normal University, Wuhan, Hubei 430079 (China); Tang, Yuxuan [Department of Electrical and Computer Engineering, University of Houston, Houston, TX 77004 (United States); Teng, Ping-Kun [Institute of Physics, Academia Sinica, Nangang 11529, Taipei, Taiwan (China); and others

    2016-09-21

    In this paper, we present the design and test results of an encoder integrated circuit for the ATLAS Liquid Argon Calorimeter trigger upgrade. The encoder implements a low-latency and low-overhead line code called LOCic. The encoder operates at 320 MHz with a latency of no greater than 21 ns. The overhead of the encoder is 14.3%. The encoder is an important block of the transmitter ASIC LOCx2, which is prototyped with a commercial 0.25 μm Silicon-on-Sapphire CMOS technology and packaged in a 100-pin QFN package. - Highlights: • We present the design and test results of an encoder integrated circuit for the ATLAS Liquid Argon Calorimeter trigger upgrade. • The encoder implements a low-latency and low-overhead line code called LOCic. The encoder operates at 320 MHz with a latency of no greater than 21 ns. The overhead of the encoder is 14.3%. • The encoder is an important block of the transmitter ASIC LOCx2, which is prototyped with a commercial 0.25 μm Silicon-on-Sapphire CMOS technology for radiation-tolerance and packaged in a 100-pin QFN package.

  14. A New Tool for Effective and Efficient Project Management

    Energy Technology Data Exchange (ETDEWEB)

    Willett, Jesse A [Washington State Univ., Pullman, WA (United States)

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  15. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  16. SEffEst: Effort estimation in software projects using fuzzy logic and neural networks

    Directory of Open Access Journals (Sweden)

    Israel

    2012-08-01

    Full Text Available Academia and practitioners confirm that software project effort prediction is crucial for an accurate software project management. However, software development effort estimation is uncertain by nature. Literature has developed methods to improve estimation correctness, using artificial intelligence techniques in many cases. Following this path, this paper presents SEffEst, a framework based on fuzzy logic and neural networks designed to increase effort estimation accuracy on software development projects. Trained using ISBSG data, SEffEst presents remarkable results in terms of prediction accuracy.

  17. 30 CFR 77.203 - Use of material or equipment overhead; safeguards.

    Science.gov (United States)

    2010-07-01

    ...; safeguards. 77.203 Section 77.203 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS...; safeguards. Where overhead repairs are being made at surface installations and equipment or material is taken...

  18. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  19. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  20. Using linear time-invariant system theory to estimate kinetic parameters directly from projection measurements

    International Nuclear Information System (INIS)

    Zeng, G.L.; Gullberg, G.T.

    1995-01-01

    It is common practice to estimate kinetic parameters from dynamically acquired tomographic data by first reconstructing a dynamic sequence of three-dimensional reconstructions and then fitting the parameters to time activity curves generated from the time-varying reconstructed images. However, in SPECT, the pharmaceutical distribution can change during the acquisition of a complete tomographic data set, which can bias the estimated kinetic parameters. It is hypothesized that more accurate estimates of the kinetic parameters can be obtained by fitting to the projection measurements instead of the reconstructed time sequence. Estimation from projections requires the knowledge of their relationship between the tissue regions of interest or voxels with particular kinetic parameters and the project measurements, which results in a complicated nonlinear estimation problem with a series of exponential factors with multiplicative coefficients. A technique is presented in this paper where the exponential decay parameters are estimated separately using linear time-invariant system theory. Once the exponential factors are known, the coefficients of the exponentials can be estimated using linear estimation techniques. Computer simulations demonstrate that estimation of the kinetic parameters directly from the projections is more accurate than the estimation from the reconstructed images

  1. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  2. The demand for refined petroleum products in Iran: Estimation and projection

    International Nuclear Information System (INIS)

    Kianian, A.M.

    1990-01-01

    The estimation and projection of the demand for refined petroleum products of the OPEC states, are important for the world petroleum market from both the demand and supply sides. In this context, this study forms an econometric model to estimte the demand for the total and four major refined petroleum products (RPPs) in Iran and project their future trends into the year 2000. The fact that Iran has the largest domestic demand for RPPs among all the OPEC members has motivated some research primarily to study the structure of the demand for such products. None, however, has utilized econometric models to estimate or project the demand for RPPs. The first section of this study discusses the structure of the Iranian energy market. Next, the demand functions for gasoline, kerosine, gas oil, fuel oil, and the total RPPs in Iran are estimated. The third section puts together the demand functions to form a model used to project the demand for RPPs up to the year 2000 under an historical scenario. Finally, some condlusions are offered. 7 tabs

  3. Engineering estimates versus impact evaluation of energy efficiency projects: Regression discontinuity evidence from a case study

    International Nuclear Information System (INIS)

    Lang, Corey; Siler, Matthew

    2013-01-01

    Energy efficiency upgrades have been gaining widespread attention across global channels as a cost-effective approach to addressing energy challenges. The cost-effectiveness of these projects is generally predicted using engineering estimates pre-implementation, often with little ex post analysis of project success. In this paper, for a suite of energy efficiency projects, we directly compare ex ante engineering estimates of energy savings to ex post econometric estimates that use 15-min interval, building-level energy consumption data. In contrast to most prior literature, our econometric results confirm the engineering estimates, even suggesting the engineering estimates were too modest. Further, we find heterogeneous efficiency impacts by time of day, suggesting select efficiency projects can be useful in reducing peak load. - Highlights: • Regression discontinuity used to estimate energy savings from efficiency projects. • Ex post econometric estimates validate ex ante engineering estimates of energy savings. • Select efficiency projects shown to reduce peak load

  4. Estimating large complex projects Estimando proyectos grandes y complejos

    Directory of Open Access Journals (Sweden)

    Cliff Schexnayder

    2007-08-01

    Full Text Available Managing large capital construction projects requires the coordination of a multitude of human, organizational, technical, and natural resources. Quite often, the engineering and construction complexities of such projects are overshadowed by economic, societal, and political challenges. The ramifications and effects, which result from differences between early project cost estimates and the bid price or the final project cost, are significant. Over the time span between the initiation of a project and the completion of construction many factors influence a project's final costs. This time span is normally several years in duration but for highly complex and technologically challenging projects, project duration can easily exceed a decade. Over that period, changes to the project scope often occur. The subject here is a presentation of strategies that support realistic cost estimating. Through literature review and interviews with transportation agencies in the U.S. and internationally the authors developed a database of the factors that are the root causes of cost estimation problemsGestionar proyectos de construcción de grandes capitales requiere de la coordinación de una multitud de recursos humanos, organizacionales, técnicos y naturales. Frecuentemente, las complejidades del diseño y construcción de esos grandes proyectos son tapadas por sus desafíos económicos, políticos y sociales. Las ramificaciones y efectos que resultan de las diferencias entre la estimación de costo inicial, el costo de la propuesta adjudicada y el costo final del proyecto son significativas. Hay numerosos factores que inciden en el costo final del proyecto entre su inicio y finalización. La duración es generalmente de varios años y puede incluso superar la década para aquellos especialmente complejos y desafiantes. En ese período de tiempo, cambios en los alcances del proyecto cambian frecuentemente. El tópico del presente artículo es mostrar

  5. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    International Nuclear Information System (INIS)

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  6. Approaches to estimating decommissioning costs

    International Nuclear Information System (INIS)

    Smith, R.I.

    1990-07-01

    The chronological development of methodology for estimating the cost of nuclear reactor power station decommissioning is traced from the mid-1970s through 1990. Three techniques for developing decommissioning cost estimates are described. The two viable techniques are compared by examining estimates developed for the same nuclear power station using both methods. The comparison shows that the differences between the estimates are due largely to differing assumptions regarding the size of the utility and operating contractor overhead staffs. It is concluded that the two methods provide bounding estimates on a range of manageable costs, and provide reasonable bases for the utility rate adjustments necessary to pay for future decommissioning costs. 6 refs

  7. Project survey for trolley-bus transport; Johdinautoliikenteen hankeselvitys

    Energy Technology Data Exchange (ETDEWEB)

    Anttila, T.; Eklund, P.; Airaksinen, S.; Maettoe, R.; Laehdetie, A.

    2011-04-15

    To investigate the feasibility and rationality of the revival of trolley bus traffic in Helsinki a full size project plan was conducted for a variety of alternatives. This included a survey on the latest developments of the trolley bus technology, three optional plans for route network, a budgetary level design for a fully functional depot in Koskela bus depot, examination of urban landscape structures, a study on organisational options, particular technical specifications applicable on suitable trolley buses and an examination of the impacts on the environment and on the future development of public transport. The basic concept of a trolley bus as a means of electric public transport vehicle has found its form over the years, but all the components of the system undergo at present intensive development. In context of this survey also the option of a fully autonomous electric bus powered by accumulators or fuel cells and the like was investigated. However, such technology is still totally inadequate for a heavy duty bus. There are no economically competitive and effective systems available as yet. The trolley bu is the far most reliable system and gives the best life cycle economy for a foreseeable future. Earliest estimates for alternative electric technologies in regular bus service are viable just after one investment cycle some time beyond 2030. Then it should be possible to run without the support of a comprehensive overhead line. The latest achievements in the development of trolley bus are auxiliary engine and accumulator systems allowing for more autonomous propulsion. Nowadays, trolley buses are equipped with an auxiliary power unit that alleviates the traditional restrictions of the overhead line. The modern trolley bus may run short distances without the trolley lines. Recuperation of the kinetic energy at deceleration (braking) either into the overhead line network or by storing it in the vehicle is one of the characteristics of modern trolley buses

  8. Design and Application of Cables and Overhead Lines in Wind Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Behnke, M. R. [IEEE PES Wind Plant Collector System Design Working Group; Bellei, T.A. [IEEE PES Wind Plant Collector System Design Working Group; Bloethe, W.G. [IEEE PES Wind Plant Collector System Design Working Group; Bradt, M. [IEEE PES Wind Plant Collector System Design Working Group; Brooks, C. [IEEE PES Wind Plant Collector System Design Working Group; Camm, E H [IEEE PES Wind Plant Collector System Design Working Group; Dilling, W. [IEEE PES Wind Plant Collector System Design Working Group; Goltz, B. [IEEE PES Wind Plant Collector System Design Working Group; Hermanson, J. [IEEE PES Wind Plant Collector System Design Working Group; Li, J. [IEEE PES Wind Plant Collector System Design Working Group; Loy, P. [IEEE PES Wind Plant Collector System Design Working Group; McLean, K. [IEEE PES Wind Plant Collector System Design Working Group; Niemira, J. [IEEE PES Wind Plant Collector System Design Working Group; Nuckles, K. [IEEE PES Wind Plant Collector System Design Working Group; Patino, J. [IEEE PES Wind Plant Collector System Design Working Group; Reza, M [IEEE PES Wind Plant Collector System Design Working Group; Richardson, B. [IEEE PES Wind Plant Collector System Design Working Group; Samaan, N. [IEEE PES Wind Plant Collector System Design Working Group; Schoene, Jens [IEEE PES Wind Plant Collector System Design Working Group; Smith, Travis M [ORNL; Snyder, Isabelle B [ORNL; Starke, Michael R [ORNL; Tesch, M. [IEEE PES Wind Plant Collector System Design Working Group; Walling, R. [IEEE PES Wind Plant Collector System Design Working Group; Zahalka, G. [IEEE PES Wind Plant Collector System Design Working Group

    2010-01-01

    This paper presents a summary of the most impor- tant considerations for wind power plant collection system un- derground and overhead cable designs. Various considerations, including conductor selection, soil thermal properties, installa- tion methods, splicing, concentric grounding, and NESC/NEC requirements are discussed.

  9. Eccentric and isometric shoulder rotator cuff strength testing using a hand-held dynamometer: reference values for overhead athletes.

    Science.gov (United States)

    Cools, Ann M J; Vanderstukken, Fran; Vereecken, Frédéric; Duprez, Mattias; Heyman, Karel; Goethals, Nick; Johansson, Fredrik

    2016-12-01

    In order to provide science-based guidelines for injury prevention or return to play, regular measurement of isometric and eccentric internal (IR) and external (ER) rotator strength is warranted in overhead athletes. However, up to date, no normative database exists regarding these values, when measured with a hand-held dynamometer. Therefore, the purpose of the study was to provide a normative database on isometric and eccentric rotator cuff (RC) strength values in a sample of overhead athletes, and to discuss gender, age and sports differences. A HHD was used to measure RC strength in 201 overhead athletes between 18 and 50 years old from three different sports disciplines: tennis, volleyball and handball. Isometric as well as eccentric strength was measured in different shoulder positions. Outcome variables of interest were isometric ER and IR strength, eccentric ER strength, and intermuscular strength ratios ER/IR. Our results show significant side, gender and sports discipline differences in the isometric and eccentric RC strength. However, when normalized to body weight, gender differences often are absent. In general, strength differences are in favour of the dominant side, the male athletes and handball. Intermuscular ER/IR ratios showed gender, sports, and side differences. This normative database is necessary to help the clinician in the evaluation of RC strength in healthy and injured overhead athletes. In view of the preventive screening and return-to-play decisions in overhead athletes, normalization to body weight and calculating intermuscular ratios are key points in this evaluation. Diagnostic study, Level III.

  10. Energized overhead ground wires - OHGWs the pioneer Brazilian application

    Energy Technology Data Exchange (ETDEWEB)

    D` Ajuz, Ary; Martinez, Manuel L.B.; Araujo, Ana Maria R; Takai, Mario Noboru; Sganzerla, Flavio [ELETRONORTE, Brasilia, DF (Brazil); O, Junior, Helio P; Fonseca, Claudio S [Marte Engenharia (Brazil); Guimaraes, R P; Mendes, Eloisa R

    1994-12-31

    This paper introduces an economical solution for close HV lines small villages and farms load supply. The needed modifications to adapt a planned transmission system to supply loads located along the lines routes are presented. The paper describes the two overhead ground wires scheme planned for implementation in the 230 kV transmission line under construction by ELETRONORTE in Mato Grosso and Rondonia supplying loads each one totaling roughly 8 MW. (author) 4 refs., 4 figs., 2 tabs.

  11. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

    Directory of Open Access Journals (Sweden)

    Igor Peško

    2017-01-01

    Full Text Available Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs and support vector machines (SVM are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.

  12. Allocating Overhead Costs in a Navy Working Capital Fund Environment: An Analysis and Comparison of Current Navy Policy and Private Sector Practice

    National Research Council Canada - National Science Library

    Schulte, Steven

    1999-01-01

    .... The objective of this thesis was to evaluate the overhead allocation practices of five private sector organizations for the potential improvement of overhead allocation practices in Navy Working Capital Fund activities...

  13. Anterior internal impingement of the shoulder in rugby players and other overhead athletes

    Directory of Open Access Journals (Sweden)

    Siddharth R. Shah, MBBS, MSc Sports Medicine (UK, MRCS-Ed

    2017-04-01

    Conclusion: This series of anterior internal impingement, which we believe is the largest in the literature to date, demonstrates the value of an to assess and successfully treat overhead athletes with anterior impingement syndrome.

  14. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  15. Effort estimation for enterprise resource planning implementation projects using social choice - a comparative study

    Science.gov (United States)

    Koch, Stefan; Mitlöhner, Johann

    2010-08-01

    ERP implementation projects have received enormous attention in the last years, due to their importance for organisations, as well as the costs and risks involved. The estimation of effort and costs associated with new projects therefore is an important topic. Unfortunately, there is still a lack of models that can cope with the special characteristics of these projects. As the main focus lies in adapting and customising a complex system, and even changing the organisation, traditional models like COCOMO can not easily be applied. In this article, we will apply effort estimation based on social choice in this context. Social choice deals with aggregating the preferences of a number of voters into a collective preference, and we will apply this idea by substituting the voters by project attributes. Therefore, instead of supplying numeric values for various project attributes, a new project only needs to be placed into rankings per attribute, necessitating only ordinal values, and the resulting aggregate ranking can be used to derive an estimation. We will describe the estimation process using a data set of 39 projects, and compare the results to other approaches proposed in the literature.

  16. Prevention of shoulder injuries in overhead athletes: a science-based approach

    Directory of Open Access Journals (Sweden)

    Ann M. Cools

    2015-10-01

    Full Text Available The shoulder is at high risk for injury during overhead sports, in particular in throwing or hitting activities, such as baseball, tennis, handball, and volleyball. In order to create a scientific basis for the prevention of recurrent injuries in overhead athletes, four steps need to be undertaken: (1 risk factors for injury and re-injury need to be defined; (2 established risk factors may be used as return-to-play criteria, with cut-off values based on normative databases; (3 these variables need to be measured using reliable, valid assessment tools and procedures; and (4 preventative training programs need to be designed and implemented into the training program of the athlete in order to prevent re-injury. In general, three risk factors have been defined that may form the basis for recommendations for the prevention of recurrent injury and return to play after injury: glenohumeral internal-rotation deficit (GIRD; rotator cuff strength, in particular the strength of the external rotators; and scapular dyskinesis, in particular scapular position and strength.

  17. Overhead mining railway, particularly for underground use

    Energy Technology Data Exchange (ETDEWEB)

    Farkas, L

    1976-05-20

    Overhead mining railways are usually equipped with a friction wheel drive in underground use. This drive has the advantage over a gear drive that it is more robust and therefore more economic. However, it produces unsatisfactory running for difficult sections with steep gradients up or down or places where deposits of grease and dirt are inevitable. It is proposed to change over to a gear drive at such sections. The high degree of wear, which is characteristic of this type of drive, can be reduced if the drive is only used in difficult sections. It is proposed that the gear drive should be automatically switched on and off by means of stops or contacts on the rails.

  18. Marangoni Flowers and the Evil Eye: Overhead Presentations of Marangoni Flow

    Science.gov (United States)

    Mundell, Donald W.

    2009-01-01

    Intermolecular forces and surface tension gradients in solutions lead to remarkable flows, known as Marangoni flows, where liquid flows from a region of low surface tension towards higher surface tension. Details of these flows, not visible to the naked eye, are made visible on an overhead projector owing to variation in the index of refraction.…

  19. High-tension electrical-arc-induced thermal burns caused by railway overhead cables.

    Science.gov (United States)

    Koller, J

    1991-10-01

    Eleven patients with high-tension electrical-arc-induced thermal burns due to railway overhead cables were treated at the Bratislava Burn Department during a relatively short period of 18 months. All the injuries occurred by the same mechanism, that is persons climbing on top of railway carriages and approaching the 25,000 V a.c. overhead cables. All the burns were the result of an electrical arc passing externally to the body, with subsequent ignition of the victim's clothes. The cutaneous burns, ranging from 24 to 79 per cent of the BSA, were mostly deep partial to full skin thickness injuries. One patient died on day 5 postburn, the other survived. In spite of high-tension aetiology, no true electrical injuries appear to have occurred and no amputations were necessary. The pathophysiology and possible preventive measures are discussed. It must be stressed that arcing can be induced by an earthed object approaching, but not touching, a cable carrying a high voltage.

  20. The Use of Probability Theory as a Basis for Planning and Controlling Overhead Costs in Education and Industry. Final Report.

    Science.gov (United States)

    Vinson, R. B.

    In this report, the author suggests changes in the treatment of overhead costs by hypothesizing that "the effectiveness of standard costing in planning and controlling overhead costs can be increased through the use of probability theory and associated statistical techniques." To test the hypothesis, the author (1) presents an overview of the…

  1. 2D Unitary ESPRIT Based Super-Resolution Channel Estimation for Millimeter-Wave Massive MIMO with Hybrid Precoding

    KAUST Repository

    Liao, Anwen

    2017-11-01

    Millimeter-wave (mmWave) massive multiple-input multiple-output (MIMO) with hybrid precoding is a promising technique for the future 5G wireless communications. Due to a large number of antennas but a much smaller number of radio frequency (RF) chains, estimating the high-dimensional mmWave massive MIMO channel will bring the large pilot overhead. To overcome this challenge, this paper proposes a super-resolution channel estimation scheme based on two-dimensional (2D) unitary ESPRIT algorithm. By exploiting the angular sparsity of mmWave channels, the continuously distributed angle of arrivals/departures (AoAs/AoDs) can be jointly estimated with high accuracy. Specifically, by designing the uplink training signals at both base station (BS) and mobile station (MS), we first use low pilot overhead to estimate a low-dimensional effective channel, which has the same shift-invariance of array response as the high-dimensional mmWave MIMO channel to be estimated. From the low-dimensional effective channel, the superresolution estimates of AoAs and AoDs can be jointly obtained by exploiting the 2D unitary ESPRIT channel estimation algorithm. Furthermore, the associated path gains can be acquired based on the least squares (LS) criterion. Finally, we can reconstruct the high-dimensional mmWave MIMO channel according to the obtained AoAs, AoDs, and path gains. Simulation results have confirmed that the proposed scheme is superior to conventional schemes with a much lower pilot overhead.

  2. 2D Unitary ESPRIT Based Super-Resolution Channel Estimation for Millimeter-Wave Massive MIMO with Hybrid Precoding

    KAUST Repository

    Liao, Anwen; Gao, Zhen; Wu, Yongpeng; Wang, Hua; Alouini, Mohamed-Slim

    2017-01-01

    Millimeter-wave (mmWave) massive multiple-input multiple-output (MIMO) with hybrid precoding is a promising technique for the future 5G wireless communications. Due to a large number of antennas but a much smaller number of radio frequency (RF) chains, estimating the high-dimensional mmWave massive MIMO channel will bring the large pilot overhead. To overcome this challenge, this paper proposes a super-resolution channel estimation scheme based on two-dimensional (2D) unitary ESPRIT algorithm. By exploiting the angular sparsity of mmWave channels, the continuously distributed angle of arrivals/departures (AoAs/AoDs) can be jointly estimated with high accuracy. Specifically, by designing the uplink training signals at both base station (BS) and mobile station (MS), we first use low pilot overhead to estimate a low-dimensional effective channel, which has the same shift-invariance of array response as the high-dimensional mmWave MIMO channel to be estimated. From the low-dimensional effective channel, the superresolution estimates of AoAs and AoDs can be jointly obtained by exploiting the 2D unitary ESPRIT channel estimation algorithm. Furthermore, the associated path gains can be acquired based on the least squares (LS) criterion. Finally, we can reconstruct the high-dimensional mmWave MIMO channel according to the obtained AoAs, AoDs, and path gains. Simulation results have confirmed that the proposed scheme is superior to conventional schemes with a much lower pilot overhead.

  3. PMP Estimations at Sparsely Controlled Andinian Basins and Climate Change Projections

    Science.gov (United States)

    Lagos Zúñiga, M. A.; Vargas, X.

    2012-12-01

    Probable Maximum Precipitation (PMP) estimation implies an extensive review of hydrometeorological data and understandig of precipitation formation processes. There exists different methodology processes that apply for their estimations and all of them require a good spatial and temporal representation of storms. The estimation of hydrometeorological PMP on sparsely controlled basins is a difficult task, specially if the studied area has an important orographic effect due to mountains and the mixed precipitation occurrence in the most several storms time period, the main task of this study is to propose and estimate PMP in a sparsely controlled basin, affected by abrupt topography and mixed hidrology basin; also analyzing statystic uncertainties estimations and possible climate changes effects in its estimation. In this study the PMP estimation under statistical and hydrometeorological aproaches (watershed-based and traditional depth area duration analysis) was done in a semi arid zone at Puclaro dam in north Chile. Due to the lack of good spatial meteorological representation at the study zone, we propose a methodology to consider the orographic effects of Los Andes due to orographic effects patterns based in a RCM PRECIS-DGF and annual isoyetal maps. Estimations were validated with precipitation patterns for given winters, considering snow route and rainfall gauges at the preferencial wind direction, finding good results. The estimations are also compared with the highest areal storms in USA, Australia, India and China and with frequency analysis in local rain gauge stations in order to decide about the most adequate approach for the study zone. Climate change projections were evaluated with ECHAM5 GCM model, due to its good quality representation in the seasonality and the magnitude of meteorological variables. Temperature projections, for 2040-2065 period, show that there would be a rise in the catchment contributing area that would lead to an increase of the

  4. Self-actuating grapple automatically engages and releases loads from overhead cranes

    Science.gov (United States)

    Froehlich, J. A.; Karastas, G. A.

    1966-01-01

    Two-piece grapple mechanism consisting of a lift knob secured to the load and a grapple member connected to the crane or lift automatically disengages the load from the overhead lifting device when the load contacts the ground. The key feature is the sliding collar under the lift knob which enables the grapple latch to be stripped off over the lift knob.

  5. Low-altitude overhead imagery acquisition pre- and post-NPE

    Energy Technology Data Exchange (ETDEWEB)

    Pickles, W.L. [Lawerence Livermore National Lab., CA (United States); Shines, J.E.; Hawley, D.L. [and others

    1994-12-31

    We have successfully acquired all the planned overhead imagery (OHI) of the Non-Proliferation Experiment (NPE). The data set is very large and complete. Image mosaics of the area around the NPE Ground Zero (GZ) were taken at 37 12.6948N by 116 12 35.496W on top of Rainier Mesa in Areas 12 at NTS. The data were taken from a total of eight overflights on six different days. Preliminary analysis of the thermal infrared, 8-12.5-micron scanner band, taken before and after the NPE, shows some low-emission effects in virgin soil after the NPE. These effects could be due to the acceleration of the surface caused by NPE. Preliminary analysis of the visible high-resolution color RC-30 photography shows the senescence of oak leaves in an areas of 2 km around GZ. Several other groups also independently observed this phenomenon when they returned to the mesa on Friday morning, 48 hours after the NPE. Detailed study of the photography and the scanner data will be necessary to map the actual aerial extent of the senescence. If the effect is proven to be limited to the area around GZ, then we will have supporting evidence that we have actually observed shock-induced premature senescence of oak leaves. Such overhead imagery could be used to help reduce the search area during an on-site inspection as part of the Comprehensive Test Ban Treaty verification activities.

  6. Does overhead irrigation with salt affect growth, yield, and phenolic content of lentil plants?

    Directory of Open Access Journals (Sweden)

    Giannakoula Anastasia

    2012-01-01

    Full Text Available Overhead irrigation of lentil plants with salt (100 mM NaCl did not have any significant impact on plant growth, while chlorophyll content and chlorophyll fluorescence parameter Fv/Fm were affected. Under such poor irrigation water quality, the malondialdehyde content in leaves was increased due to the lipid peroxidation of membranes. In seeds, the total phenolic content (TPC was correlated to their total antioxidant capacity (TAC. High performance liquid chromatography-mass spectrometry (HPLC-MS detection showed that flavonoids (catechin, epicatechin, rutin, p-coumaric acid, quercetin, kaempferol, gallic acid and resveratrol appear to be the compounds with the greatest influence on the TAC values. Catechin is the most abundant phenolic compound in lentil seeds. Overhead irrigation with salt reduced the concentration of almost all phenolic compounds analyzed from lentil seed extracts.

  7. Wideband DOA Estimation through Projection Matrix Interpolation

    OpenAIRE

    Selva, J.

    2017-01-01

    This paper presents a method to reduce the complexity of the deterministic maximum likelihood (DML) estimator in the wideband direction-of-arrival (WDOA) problem, which is based on interpolating the array projection matrix in the temporal frequency variable. It is shown that an accurate interpolator like Chebyshev's is able to produce DML cost functions comprising just a few narrowband-like summands. Actually, the number of such summands is far smaller (roughly by factor ten in the numerical ...

  8. Implications of applying solar industry best practice resource estimation on project financing

    International Nuclear Information System (INIS)

    Pacudan, Romeo

    2016-01-01

    Solar resource estimation risk is one of the main solar PV project risks that influences lender’s decision in providing financing and in determining the cost of capital. More recently, a number of measures have emerged to mitigate this risk. The study focuses on solar industry’s best practice energy resource estimation and assesses its financing implications to the 27 MWp solar PV project study in Brunei Darussalam. The best practice in resource estimation uses multiple data sources through the measure-correlate-predict (MCP) technique as compared with the standard practice that rely solely on modelled data source. The best practice case generates resource data with lower uncertainty and yields superior high-confidence energy production estimate than the standard practice case. Using project financial parameters in Brunei Darussalam for project financing and adopting the international debt-service coverage ratio (DSCR) benchmark rates, the best practice case yields DSCRs that surpass the target rates while those of standard practice case stay below the reference rates. The best practice case could also accommodate higher debt share and have lower levelized cost of electricity (LCOE) while the standard practice case would require a lower debt share but having a higher LCOE. - Highlights: •Best practice solar energy resource estimation uses multiple datasets. •Multiple datasets are combined through measure-correlate-predict technique. •Correlated data have lower uncertainty and yields superior high-confidence energy production. •Best practice case yields debt-service coverage ratios (DSCRs) that surpass the benchmark rates. •Best practice case accommodates high debt share and have low levelized cost of electricity.

  9. Penerapan Sistem ABC (Activity Based Costing System) Sebagai Alternatif Dasar Pembebanan Biaya Overhead Pabrik (Studi Kasus Pada PT. Wonojati Wijoyo Kediri Jawa Timur)”

    OpenAIRE

    Ahmad Putri, Dian Rahmawati; Saifi, Muhammad; Hidayat, Raden Rustam

    2016-01-01

    The purpose of this study to determine the company's factory overhead charges and to find out the imposition of factory overhead costs using ABC System (Activity Based Costing System).This type of research used in this research is descriptive case study approach. ABC System (Activity Based Costing System) is a way to replace the traditional cost accounting methods have many disadvantages in determining overhead costs ,because in the application of the ABC System (Activity Based Costing System...

  10. 49 CFR 214.515 - Overhead covers for existing on-track roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... maintenance machines. 214.515 Section 214.515 Transportation Other Regulations Relating to Transportation... Roadway Maintenance Machines and Hi-Rail Vehicles § 214.515 Overhead covers for existing on-track roadway maintenance machines. (a) For those existing on-track roadway maintenance machines either currently or...

  11. Uptake and Accumulation of Pharmaceuticals in Overhead- and Surface-Irrigated Greenhouse Lettuce.

    Science.gov (United States)

    Bhalsod, Gemini D; Chuang, Ya-Hui; Jeon, Sangho; Gui, Wenjun; Li, Hui; Ryser, Elliot T; Guber, Andrey K; Zhang, Wei

    2018-01-31

    Understanding the uptake and accumulation of pharmaceuticals in vegetables under typical irrigation practices is critical to risk assessment of crop irrigation with reclaimed water. This study investigated the pharmaceutical residues in greenhouse lettuce under overhead and soil-surface irrigations using pharmaceutical-contaminated water. Compared to soil-surface irrigation, overhead irrigation substantially increased the pharmaceutical residues in lettuce shoots. The increased residue levels persisted even after washing for trimethoprim, monensin sodium, and tylosin, indicating their strong sorption to the shoots. The postwashing concentrations in fresh shoots varied from 0.05 ± 0.04 μg/kg for sulfadiazine to 345 ± 139 μg/kg for carbamazepine. Root concentration factors ranged from 0.04 ± 0.14 for tylosin to 19.2 ± 15.7 for sulfamethoxazole. Translocation factors in surface-irrigated lettuce were low for sulfamethoxalzole, trimethoprim, monensin sodium, and tylosin (0.07-0.15), but high for caffeine (4.28 ± 3.01) and carbamazepine (8.15 ± 2.87). Carbamazepine was persistent in soil and hyperaccumulated in shoots.

  12. Throughput, Energy and Overhead of Multicast Device-to-Device Communications with Network Coded Cooperation

    DEFF Research Database (Denmark)

    Hernandez, Nestor; Heide, Janus; Roetter, Daniel Enrique Lucani

    2017-01-01

    , this assumes that the throughput gains and energy savings in multicasting are much larger between devices than the base station to the receivers. However, current mobile networks suffer from many different issues varying the performance in data rates, which calls into question these assumptions. Therefore......, a first objective of this work is to assess the operating regions where employing cooperation results in higher throughput and/or energy savings. We consider multicast scenarios with network coded mechanisms employing Random Linear Network Coding (RLNC). However, although RLNC is good for low amount...... of transmissions in multicast, it has an inherent overhead from extreme high or low field related caveats. Thus, as a second objective, we review and propose the application of new network codes that posses low overhead for multicasting, by having a short representation and low dependence probability. We provide...

  13. Integrating Portfolio Management and Simulation Concepts in the ERP Project Estimation Practice

    NARCIS (Netherlands)

    Daneva, Maia; Paech, B.; Rolland, C

    2008-01-01

    This paper presents a two-site case study on requirements-based effort estimation practices in enterprise resource planning projects. Specifically, the case study investigated the question of how to handle qualitative data and highly volatile values of project context characteristics. We counterpart

  14. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  15. Numerical noise analysis for insulator of overhead transmission line

    Science.gov (United States)

    Zhang, Yulin; Chen, Yuwen; Huang, Yu

    2018-04-01

    As an important and complex issue in aero acoustic field, a lot of explorations have been devoted to the wind-induced noise. However, there is still lack of intensive investigations for aerodynamic noise in high-voltage transmission. The overhead transmission line system leads to serious occupational noise exposure in high wind-speed environment, and the noise can even injure the electricians in charge of insulator. By using computational fluid dynamics (CFD) which combined with computational aero acoustics (CAA), this paper predicts the noise generated by insulator of high voltage electricity transmission line which explores in wind environment. The simulation results indicate that the wind velocity, the assembly angle of the insulator and its ribs' distribution are the main contributory factors for the aerodynamic noise. Specifically, when wind velocity is greater than 15m/s, the alteration of noise is not sensitive to the wind velocity; furthermore, when the assembly angle increases from 0°to 60°, the noise decreases gradually, however, if the angle is happening to be 75°or 90°, it would be even greater than that at 0°. In order to inhibit the aerodynamic noise, it is necessary to control the flow blowing across the boundary of the insulator. Consequently, the result indicates that if the outermost rib is shorter than the second one, the noise reduced evidently. This information expects to provide useful help for the extremely suppression of aerodynamic noise, and also supply practical reference material for the design and application of overhead transmission line system.

  16. Sparse Adaptive Channel Estimation Based on lp-Norm-Penalized Affine Projection Algorithm

    Directory of Open Access Journals (Sweden)

    Yingsong Li

    2014-01-01

    Full Text Available We propose an lp-norm-penalized affine projection algorithm (LP-APA for broadband multipath adaptive channel estimations. The proposed LP-APA is realized by incorporating an lp-norm into the cost function of the conventional affine projection algorithm (APA to exploit the sparsity property of the broadband wireless multipath channel, by which the convergence speed and steady-state performance of the APA are significantly improved. The implementation of the LP-APA is equivalent to adding a zero attractor to its iterations. The simulation results, which are obtained from a sparse channel estimation, demonstrate that the proposed LP-APA can efficiently improve channel estimation performance in terms of both the convergence speed and steady-state performance when the channel is exactly sparse.

  17. Working with Climate Projections to Estimate Disease Burden: Perspectives from Public Health

    Directory of Open Access Journals (Sweden)

    Kathryn C. Conlon

    2016-08-01

    Full Text Available There is interest among agencies and public health practitioners in the United States (USA to estimate the future burden of climate-related health outcomes. Calculating disease burden projections can be especially daunting, given the complexities of climate modeling and the multiple pathways by which climate influences public health. Interdisciplinary coordination between public health practitioners and climate scientists is necessary for scientifically derived estimates. We describe a unique partnership of state and regional climate scientists and public health practitioners assembled by the Florida Building Resilience Against Climate Effects (BRACE program. We provide a background on climate modeling and projections that has been developed specifically for public health practitioners, describe methodologies for combining climate and health data to project disease burden, and demonstrate three examples of this process used in Florida.

  18. Comparative study of passive and semi-active energy dissipation devices intended for overhead cranes

    International Nuclear Information System (INIS)

    Guihot, P.; Revaud, D.

    1996-04-01

    This paper deals with the results of a bibliographic survey of energy dissipation devices which could be adapted for overhead cranes. The principle of passive devices using friction, yielding steel systems of viscous and viscoelastic systems are remembered. An active control system, which needs a minimum of external control energy is also presented. The application to overhead cranes which have a strong non linear behaviour under strong seismic motion (sliding between rails and wheels, local yielding and damage) is further discussed. The first results of a numerical study in progress are likewise purposed. The criterion of selection of the devices turn on the performance, the robustness and the reliability. The behaviour in the presence of non linearities, the sensitivity to the variations of the vibratory characteristics, and lastly the sensitivity to the response delay of the active controller are taken into account. (authors). 14 refs., 4 figs

  19. The Process to Estimate Economical Benefits of Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    Jan Kosina

    2013-07-01

    Full Text Available This paper seeks to define the process for the continuous evaluation of the financial benefits during Six Sigma project life time. The financial criteria are critical success factors of a Six Sigma project. The process has been developed as part of the six sigma project monitoring in order to estimate proper allocation of the resources taking in account the expected project benefits as well as evaluationof real achievements. The evaluation of the finacial benefits based on the quality costs is not sufficient in the real life and has to be accomplished with key financial performance indicators of the business to visualize the results. The evaluation based on the savings seems to be too difficult especially for green belts. The early involvement of the finance department in the project definition as well as ongoing evaluation is key. The defined process has been applied to real business enviroment.

  20. Seismic strengthening of overhead roads between reactor buildings of WWER-1000 MW type NPP

    International Nuclear Information System (INIS)

    Stoyanov, G.; Jordanov, M.

    2005-01-01

    This paper presents results obtained during the upgrading design of overhead roads (OHR) between WWER-1000 MW Reactor Units at Kozloduy NPP. In order to avoid the deficiencies of OHR seismic capacity different approaches were developed based on the site and structure specifics. Overhead roads are precasted RC structures. They consist of pedestrian gallery and pipeline RC box, connecting reactor buildings with auxiliary building. They are mounted at approximately 10 m above ground level. The overhead roads are evaluated at their as-is status and a seismic upgrading of the structure is designed. The analysis of the upgraded structure is performed for Review Level Earthquake (RLE). Soil-Structure Interaction (SSI) effects are taken into account through equivalent soil springs with frequency adjusted stiffnesses. The upgraded structure is checked for conformance with the specially developed technical design specification based on International, US and Bulgarian standards and codes, taking into account site specific conditions. The general approach is consistent with up-to-date practice for evaluation and upgrade of nuclear power plant facilities. The existing site conditions and Owner's requirements are taken into account during development of the upgrading. The proposed upgrading measures can be divided in two major categories global and local. Special attention is paid to improvement of the ductile behavior of the structure through new detailing and upgrading of existing connection. These measures are grouped in two final design concepts and after a comparative study one of them is chosen for implementation. For the upgraded structure response spectra are derived at locations where equipment is attached. (authors)

  1. Partial discharge location technique for covered-conductor overhead distribution lines

    Energy Technology Data Exchange (ETDEWEB)

    Isa, M.

    2013-02-01

    In Finland, covered-conductor (CC) overhead lines are commonly used in medium voltage (MV) networks because the loads are widely distributed in the forested terrain. Such parts of the network are exposed to leaning trees which produce partial discharges (PDs) in CC lines. This thesis presents a technique to locate the PD source on CC overhead distribution line networks. The algorithm is developed and tested using a simulated study and experimental measurements. The Electromagnetic Transient Program-Alternative Transient Program (EMTP-ATP) is used to simulate and analyze a three-phase PD monitoring system, while MATLAB is used for post-processing of the high frequency signals which were measured. A Rogowski coil is used as the measuring sensor. A multi-end correlation-based technique for PD location is implemented using the theory of maximum correlation factor in order to find the time difference of arrival (TDOA) between signal arrivals at three synchronized measuring points. The three stages of signal analysis used are: (1) denoising by applying discrete wavelet transform (DWT); (2) extracting the PD features using the absolute or windowed standard deviation (STD) and; (3) locating the PD point. The advantage of this technique is the ability to locate the PD source without the need to know the first arrival time and the propagation velocity of the signals. In addition, the faulty section of the CC line between three measuring points can also be identified based on the degrees of correlation. An experimental analysis is performed to evaluate the PD measurement system performance for PD location on CC overhead lines. The measuring set-up is arranged in a high voltage (HV) laboratory. A multi-end measuring method is chosen as a technique to locate the PD source point on the line. A power transformer 110/20 kV was used to energize the AC voltage up to 11.5 kV/phase (20 kV system). The tests were designed to cover different conditions such as offline and online

  2. AN ENHANCED MODEL TO ESTIMATE EFFORT, PERFORMANCE AND COST OF THE SOFTWARE PROJECTS

    Directory of Open Access Journals (Sweden)

    M. Pauline

    2013-04-01

    Full Text Available The Authors have proposed a model that first captures the fundamentals of software metrics in the phase 1 consisting of three primitive primary software engineering metrics; they are person-months (PM, function-points (FP, and lines of code (LOC. The phase 2 consists of the proposed function point which is obtained by grouping the adjustment factors to simplify the process of adjustment and to ensure more consistency in the adjustments. In the proposed method fuzzy logic is used for quantifying the quality of requirements and is added as one of the adjustment factor, thus a fuzzy based approach for the Enhanced General System Characteristics to Estimate Effort of the Software Projects using productivity has been obtained. The phase 3 takes the calculated function point from our work and is given as input to the static single variable model (i.e. to the Intermediate COCOMO and COCOMO II for cost estimation. The Authors have tailored the cost factors in intermediate COCOMO and both; cost and scale factors are tailored in COCOMO II to suite to the individual development environment, which is very important for the accuracy of the cost estimates. The software performance indicators are project duration, schedule predictability, requirements completion ratio and post-release defect density, are also measured for the software projects in my work. A comparative study for effort, performance measurement and cost estimation of the software project is done between the existing model and the authors proposed work. Thus our work analyzes the interaction¬al process through which the estimation tasks were collectively accomplished.

  3. Risk factors for, and prevention of, shoulder injuries in overhead sports: a systematic review with best-evidence synthesis.

    Science.gov (United States)

    Asker, Martin; Brooke, Hannah L; Waldén, Markus; Tranaeus, Ulrika; Johansson, Fredrik; Skillgate, Eva; Holm, Lena W

    2018-03-26

    To assess the evidence for risk factors and prevention measures for shoulder injuries in overhead sports. Systematic review with best-evidence synthesis. Medline (Ovid), PubMed (complementary search), Embase (Elsevier), Cochrane (Wiley), SPORTDiscus (Ebsco) and Web of Science Core Collection (Thomson Reuters), from 1 January 1990 to 15 May 2017. Randomised controlled trials, cohort studies and case-control studies on risk factors or prevention measures for shoulder injuries in overhead sports. The eligible studies were quality assessed using the Scottish Intercollegiate Guidelines Network criteria. Of 4778 studies identified, 38 were eligible for quality review and 17 met the quality criteria to be included in the evidence synthesis. One additional quality study presented a shoulder injury prevention programme. Most studies focused on baseball, lacrosse or volleyball (n=13). The risk factors examined included participation level (competition vs training) (n=10), sex (n=4), biomechanics (n=2) and external workload (n=2). The evidence for all risk factors was limited or conflicting. The effect of the prevention programme within the subgroup of uninjured players at baseline was modest and possibly lacked statistical power. All investigated potential risk factors for shoulder injury in overhead sports had limited evidence, and most were non-modifiable (eg, sex). There is also limited evidence for the effect of shoulder injury prevention measures in overhead sports. CRD42015026850. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  4. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  5. Competitive pricing in markets with different overhead costs : Concealment or leakage of cost information?

    NARCIS (Netherlands)

    Cardinaels, E.; Roodhooft, F.; Warlop, L.; Van Herck, G.

    2008-01-01

    This paper experimentally investigates how leaders and followers in a duopoly set prices for two product markets that have different overhead costs. In a fully crossed two‐by‐two design, we manipulate the participants' private cost report quality as either low or high, representing the extent to

  6. Software project effort estimation foundations and best practice guidelines for success

    CERN Document Server

    Trendowicz, Adam

    2014-01-01

    Software effort estimation is one of the oldest and most important problems in software project management, and thus today there are a large number of models, each with its own unique strengths and weaknesses in general, and even more importantly, in relation to the environment and context in which it is to be applied.Trendowicz and Jeffery present a comprehensive look at the principles of software effort estimation and support software practitioners in systematically selecting and applying the most suitable effort estimation approach. Their book not only presents what approach to take and how

  7. Variable disparity-motion estimation based fast three-view video coding

    Science.gov (United States)

    Bae, Kyung-Hoon; Kim, Seung-Cheol; Hwang, Yong Seok; Kim, Eun-Soo

    2009-02-01

    In this paper, variable disparity-motion estimation (VDME) based 3-view video coding is proposed. In the encoding, key-frame coding (KFC) based motion estimation and variable disparity estimation (VDE) for effectively fast three-view video encoding are processed. These proposed algorithms enhance the performance of 3-D video encoding/decoding system in terms of accuracy of disparity estimation and computational overhead. From some experiments, stereo sequences of 'Pot Plant' and 'IVO', it is shown that the proposed algorithm's PSNRs is 37.66 and 40.55 dB, and the processing time is 0.139 and 0.124 sec/frame, respectively.

  8. Reliance on and Reliability of the Engineer’s Estimate in Heavy Civil Projects

    OpenAIRE

    Okere, George

    2017-01-01

    To the contractor, the engineer’s estimate is the target number to aim for, and the basis for a contractor to evaluate the accuracy of their estimate. To the owner, the engineer’s estimate is the basis for funding, evaluation of bids, and for predicting project costs. As such the engineer’s estimate is the benchmark. This research sought to investigate the reliance on, and the reliability of the engineer’s estimate in heavy civil cost estimate. The research objective was to characterize the e...

  9. Weakly supervised training of deep convolutional neural networks for overhead pedestrian localization in depth fields

    NARCIS (Netherlands)

    Corbetta, A.; Menkovski, V.; Toschi, F.

    Overhead depth map measurements capture sufficient amount of information to enable human experts to track pedestrians accurately. However, fully automating this process using image analysis algorithms can be challenging. Even though hand-crafted image analysis algorithms are successful in many

  10. Steps for arm and trunk actions of overhead forehand stroke used in badminton games across skill levels.

    Science.gov (United States)

    Wang, Jianyu; Liu, Wenhao; Moffit, Jeffrey

    2009-08-01

    The purpose of this study was to examine arm and trunk actions in overhead forehand strokes used in badminton games across skill levels. The participants were 80 students (40 boys, 40 girls) who were randomly selected from video recordings of 300 students ages 16 to 19 years. The videotaped performances of overhead forehand strokes were coded based on three steps of arm action (elbow flexion, elbow and humeral flexion, and upward backswing) and three steps of trunk action (no trunk action, forward-backward movement, and trunk rotation). Students across the four skill levels exhibited different patterns of arm and trunk actions. Students at advanced levels used more mature arm and trunk actions.

  11. Headgear Accessories Classification Using an Overhead Depth Sensor

    Directory of Open Access Journals (Sweden)

    Carlos A. Luna

    2017-08-01

    Full Text Available In this paper, we address the generation of semantic labels describing the headgear accessories carried out by people in a scene under surveillance, only using depth information obtained from a Time-of-Flight (ToF camera placed in an overhead position. We propose a new method for headgear accessories classification based on the design of a robust processing strategy that includes the estimation of a meaningful feature vector that provides the relevant information about the people’s head and shoulder areas. This paper includes a detailed description of the proposed algorithmic approach, and the results obtained in tests with persons with and without headgear accessories, and with different types of hats and caps. In order to evaluate the proposal, a wide experimental validation has been carried out on a fully labeled database (that has been made available to the scientific community, including a broad variety of people and headgear accessories. For the validation, three different levels of detail have been defined, considering a different number of classes: the first level only includes two classes (hat/cap, and no hat/cap, the second one considers three classes (hat, cap and no hat/cap, and the last one includes the full class set with the five classes (no hat/cap, cap, small size hat, medium size hat, and large size hat. The achieved performance is satisfactory in every case: the average classification rates for the first level reaches 95.25%, for the second one is 92.34%, and for the full class set equals 84.60%. In addition, the online stage processing time is 5.75 ms per frame in a standard PC, thus allowing for real-time operation.

  12. Estimation of the 3D positioning of anatomic structures from radiographic projection and volume knowledge

    Energy Technology Data Exchange (ETDEWEB)

    Bifulco, P; Cesarelli, M; Roccasalva Firenze, M; Verso, E; Sansone, M; Bracale, M [University of Naples, Federico II, Electronic Engineering Department, Bioengineering Unit, Via Claudio, 21 - 80125 Naples (Italy)

    1999-12-31

    The aim of this study is to develop a method to estimate the 3D positioning of an anatomic structure using the knowledge of its volume (provided by CT or MRI) combined with a single radiographic projection. This method could be applied in stereotactic surgery or in the study of 3D body joints kinematics. The knowledge of the 3D anatomical structure, available from CT (or in future MRI) is used to estimate the orientation of the projection that better match the actual 2D available projection. For this purpose it was necessary to develop an algorithm to simulate the radiographic projections. The radiographic image formation process has been simulated utilizing the geometrical characteristics of a real radiographic device and the volumetric anatomical data of the patient, obtained by 3D diagnostic CT images. The position of the patient volume respect to the radiological device is estimated comparing the actual radiographic projection with those simulated, maximising a similarity index. To assess the estimation, the 3D positioning of a segmented vertebra has been used as a test volume. The assessment has been carried out only by means of simulation. Estimation errors have been statistically evaluated. Conditions of mispositioning and noise have been also considered. The results relative to the simulation show the feasibility of the method. From the analysis of the errors emerges that the searching procedure results robust respect to the addition of white Gaussian noise. (authors) 13 fers., 4 figs., 1 tabs.

  13. Estimation of the 3D positioning of anatomic structures from radiographic projection and volume knowledge

    International Nuclear Information System (INIS)

    Bifulco, P.; Cesarelli, M.; Roccasalva Firenze, M.; Verso, E.; Sansone, M.; Bracale, M.

    1998-01-01

    The aim of this study is to develop a method to estimate the 3D positioning of an anatomic structure using the knowledge of its volume (provided by CT or MRI) combined with a single radiographic projection. This method could be applied in stereotactic surgery or in the study of 3D body joints kinematics. The knowledge of the 3D anatomical structure, available from CT (or in future MRI) is used to estimate the orientation of the projection that better match the actual 2D available projection. For this purpose it was necessary to develop an algorithm to simulate the radiographic projections. The radiographic image formation process has been simulated utilizing the geometrical characteristics of a real radiographic device and the volumetric anatomical data of the patient, obtained by 3D diagnostic CT images. The position of the patient volume respect to the radiological device is estimated comparing the actual radiographic projection with those simulated, maximising a similarity index. To assess the estimation, the 3D positioning of a segmented vertebra has been used as a test volume. The assessment has been carried out only by means of simulation. Estimation errors have been statistically evaluated. Conditions of mispositioning and noise have been also considered. The results relative to the simulation show the feasibility of the method. From the analysis of the errors emerges that the searching procedure results robust respect to the addition of white Gaussian noise. (authors)

  14. Increased knee valgus alignment and moment during single-leg landing after overhead stroke as a potential risk factor of anterior cruciate ligament injury in badminton.

    Science.gov (United States)

    Kimura, Yuka; Ishibashi, Yasuyuki; Tsuda, Eiichi; Yamamoto, Yuji; Hayashi, Yoshimitsu; Sato, Shuichi

    2012-03-01

    In badminton, knees opposite to the racket-hand side received anterior cruciate ligament (ACL) injuries during single-leg landing after overhead stroke. Most of them occurred in the backhand-side of the rear court. Comparing lower limb biomechanics during single-leg landing after overhead stroke between the forehand-side and backhand-side court may help explain the different injury rates depending on court position. The knee kinematics and kinetics during single-leg landing after overhead stroke following back-stepping were different between the forehand-side and backhand-side court. Controlled laboratory study. Hip, knee and ankle joint kinematic and knee kinetic data were collected for 17 right-handed female college badminton players using a 3-dimensional motion analysis system. Subjects performed single-left-legged landing after an overhead stroke following left and right back-stepping. The kinematic and kinetic data of the left lower extremities during landing were measured and compared between left and right back-steps. Hip flexion and abduction and knee valgus at the initial contact, hip and knee flexion and knee valgus at the maximum knee flexion and the maximum knee valgus moment were significantly larger for the left back-step than the right back-step (p<0.05). Significant differences in joint kinematics and kinetics of the lower extremity during single-leg landing after overhead stroke were observed between different back-step directions. Increased knee valgus angle and moment following back-stepping to the backhand-side might be related to the higher incidence of ACL injury during single-leg landing after overhead stroke.

  15. Residual life assessment of overhead transmission lines 110 kV and above and determination of their reconstruction terms

    Directory of Open Access Journals (Sweden)

    Uteuliyev Bauyrzhan

    2017-01-01

    Full Text Available In this article is given a method for assessment the residual life of overhead transmission lines on reinforced concrete supports with centrifuged poles. Reinforced concrete poles of supports, wires and lightning protection cables are adopted as the main elements. The intensity of change in the actual state parameters of these elements is determined by the laws of random variables distribution that allow predicting the residual life and the timing of repairs and reconstruction of overhead transmission lines. The parameters of natural climatic conditions and other external factors are considered by including of coefficients into the formula for changing the actual state parameters.

  16. Shoulder MR arthrography of the posterior labrocapsular complex in overhead throwers with pathologic internal impingement and internal rotation deficit

    International Nuclear Information System (INIS)

    Tuite, Michael J.; Petersen, Brian D.; Wise, Steven M.; Fine, Jason P.; Kaplan, Lee D.; Orwin, John F.

    2007-01-01

    To determine if overhead-throwing athletes with internal impingement pain and internal rotation deficit have thickening of the posterior inferior labrocapsular complex on MR arthrogram images. This study was approved and a waiver of consent granted by our institutional review board. Twenty-six overhead-throwing athletes with internal impingement pain and internal rotation deficit, and 26 controls who had undergone MR arthrograms, were retrospectively examined. The MR studies were combined and read in a blind fashion. On an axial image through the posteroinferior glenoid rim, the readers measured the labral length, capsule-labrum length, and the posterior recess angle. A t-test was used to determine statistical significance. The mean labral length was 4.9 mm [standard deviation (SD) 1.4 mm] for the controls, and 6.4 mm (SD 1.6 mm) for the athletes (P = 0.001). The mean capsule-labrum length was 5.4 mm (SD 2.1 mm) for the controls, and 8.8 mm (SD 2.9 mm) for the athletes (P < 0.001). The mean posterior recess angle measured 65 (SD 27 ) for the controls and 94 (SD 38 ) for the athletes (P = 0.002). Overhead-throwing athletes with internal impingement pain and internal rotation deficit tend to have a thicker labrum and a shallower capsular recess in the posterior inferior shoulder joint than do non-overhead-throwing athletes. In many, the posteroinferior capsule is also thickened. These MR findings should alert the radiologist to closely inspect the posterior cuff and posterosuperior labrum for the tears associated with internal impingement. (orig.)

  17. Shoulder MR arthrography of the posterior labrocapsular complex in overhead throwers with pathologic internal impingement and internal rotation deficit

    Energy Technology Data Exchange (ETDEWEB)

    Tuite, Michael J; Petersen, Brian D; Wise, Steven M [University of Wisconsin Hospital and Clinics, Department of Radiology, Madison, WI (United States); Fine, Jason P [University of Wisconsin Hospital and Clinics, Department of Biostatistics, Madison, WI (United States); Kaplan, Lee D; Orwin, John F [University of Wisconsin Hospital and Clinics, Department of Orthopedic Surgery, Madison, WI (United States)

    2007-06-15

    To determine if overhead-throwing athletes with internal impingement pain and internal rotation deficit have thickening of the posterior inferior labrocapsular complex on MR arthrogram images. This study was approved and a waiver of consent granted by our institutional review board. Twenty-six overhead-throwing athletes with internal impingement pain and internal rotation deficit, and 26 controls who had undergone MR arthrograms, were retrospectively examined. The MR studies were combined and read in a blind fashion. On an axial image through the posteroinferior glenoid rim, the readers measured the labral length, capsule-labrum length, and the posterior recess angle. A t-test was used to determine statistical significance. The mean labral length was 4.9 mm [standard deviation (SD) 1.4 mm] for the controls, and 6.4 mm (SD 1.6 mm) for the athletes (P = 0.001). The mean capsule-labrum length was 5.4 mm (SD 2.1 mm) for the controls, and 8.8 mm (SD 2.9 mm) for the athletes (P < 0.001). The mean posterior recess angle measured 65 (SD 27 ) for the controls and 94 (SD 38 ) for the athletes (P = 0.002). Overhead-throwing athletes with internal impingement pain and internal rotation deficit tend to have a thicker labrum and a shallower capsular recess in the posterior inferior shoulder joint than do non-overhead-throwing athletes. In many, the posteroinferior capsule is also thickened. These MR findings should alert the radiologist to closely inspect the posterior cuff and posterosuperior labrum for the tears associated with internal impingement. (orig.)

  18. Fast computation of statistical uncertainty for spatiotemporal distributions estimated directly from dynamic cone beam SPECT projections

    International Nuclear Information System (INIS)

    Reutter, Bryan W.; Gullberg, Grant T.; Huesman, Ronald H.

    2001-01-01

    The estimation of time-activity curves and kinetic model parameters directly from projection data is potentially useful for clinical dynamic single photon emission computed tomography (SPECT) studies, particularly in those clinics that have only single-detector systems and thus are not able to perform rapid tomographic acquisitions. Because the radiopharmaceutical distribution changes while the SPECT gantry rotates, projections at different angles come from different tracer distributions. A dynamic image sequence reconstructed from the inconsistent projections acquired by a slowly rotating gantry can contain artifacts that lead to biases in kinetic parameters estimated from time-activity curves generated by overlaying regions of interest on the images. If cone beam collimators are used and the focal point of the collimators always remains in a particular transaxial plane, additional artifacts can arise in other planes reconstructed using insufficient projection samples [1]. If the projection samples truncate the patient's body, this can result in additional image artifacts. To overcome these sources of bias in conventional image based dynamic data analysis, we and others have been investigating the estimation of time-activity curves and kinetic model parameters directly from dynamic SPECT projection data by modeling the spatial and temporal distribution of the radiopharmaceutical throughout the projected field of view [2-8]. In our previous work we developed a computationally efficient method for fully four-dimensional (4-D) direct estimation of spatiotemporal distributions from dynamic SPECT projection data [5], which extended Formiconi's least squares algorithm for reconstructing temporally static distributions [9]. In addition, we studied the biases that result from modeling various orders temporal continuity and using various time samplings [5]. the present work, we address computational issues associated with evaluating the statistical uncertainty of

  19. Measurements of residual deformations of steel-aluminum conductors in operating overhead lines

    Energy Technology Data Exchange (ETDEWEB)

    Durov, E.V.; Kesel' man, L.M.; Treiger, A.S.

    1982-12-01

    Experience in the operation of overhead power lines using steel-aluminum conductors is presented. Measurements were taken on the residual deformation of the steel-aluminum lines to determine the amount of sag increase and to forecast this increase for the entire period of operation. It is recommended that the work on measuring the residual deformation in the power lines be extended to a broader range of operating conditions such as conductors, spans, and climate conditions.

  20. Project Parameter Estimation on the Basis of an Erp Database

    Directory of Open Access Journals (Sweden)

    Relich Marcin

    2013-12-01

    Full Text Available Nowadays, more and more enterprises are using Enterprise Resource Planning (EPR systems that can also be used to plan and control the development of new products. In order to obtain a project schedule, certain parameters (e.g. duration have to be specified in an ERP system. These parameters can be defined by the employees according to their knowledge, or can be estimated on the basis of data from previously completed projects. This paper investigates using an ERP database to identify those variables that have a significant influence on the duration of a project phase. In the paper, a model of knowledge discovery from an ERP database is proposed. The presented method contains four stages of the knowledge discovery process such as data selection, data transformation, data mining and interpretation of patterns in the context of new product development. Among data mining techniques, a fuzzy neural system is chosen to seek relationships on the basis of data from completed projects stored in an ERP system.

  1. Overhead work and shoulder-neck pain in orchard farmers harvesting pears and apples.

    Science.gov (United States)

    Sakakibara, H; Miyao, M; Kondo, T; Yamada, S

    1995-04-01

    The effects of overhead work were studied by comparing orchard farmers' musculoskeletal symptoms while bagging pears with those same symptoms while bagging apples. The subjects were 52 Japanese female farmers, who were examined twice an evening in late June for bagging pears, and during another evening of late July for bagging apples, when each task had been almost finished. They were questioned about musculoskeletal complaints of stiffness and pain during each job, and examined for muscle tenderness and pain from joint movement. Arm elevation angles during the work were measured for each type of bagging. The prevalence of stiffness and pain in the neck and shoulder, muscle tenderness in the shoulder regions, and pain in neck motion were found to be significantly higher when bagging pears than apples. Musculoskeletal symptoms of parts other than the neck and shoulder did not differ between the two types of bagging. The working posture of elevating the arm more than 90 degrees was assumed to account for 75% of the time bagging pears, against 40% for bagging apples. Overhead work requiring arm elevation and head extension was considered to be closely related with shoulder-neck disorders among farmers.

  2. Random Shift and XOR of Unequal-sized Packets (RaSOR) to Shave off Transmission Overhead

    DEFF Research Database (Denmark)

    Taghouti, Maroua; Roetter, Daniel Enrique Lucani; Fitzek, Frank Hanns Paul

    2017-01-01

    We propose the design of a novel coding scheme of unequal-sized packets. Unlike the conventional wisdom that consists of brute-force zero-padding in Random Linear Network Coding (RLNC), we exploit this heterogeneity to shave off this trailing overhead and transmit considerably less coded packets....

  3. Unevenness of Sliding Surface of Overhead Rigid Conductor Lines and Method for Reducing Unevenness

    Science.gov (United States)

    Aboshi, Mitsuo; Shimizu, Masashi

    Rigid conductor lines are used in many subways, because the use of such conductor lines reduces the risk of accidents and because less space is required for their installation. However, as the unevenness of the sliding surface of the rigid conductor lines significantly influences the fluctuations in the contact force between pantographs and contact lines, it is necessary to decrease the unevenness at the construction as well as the maintenance stages. In order to investigate the installation accuracy of overhead rigid conductor lines, we have developed a device that accurately and continuously measures the unevenness of the sliding surface. By using this measuring device, we have confirmed that the unevenness of the sliding surface depends on various factors such as the sag between the support points, the deformation of the aluminum base or the conductive rail in the case of a long wavelength, the slight sagging unevenness between the bolts of the long ear, the undulating wear etc. This paper describes the actual unevenness conditions and the technical methods for decreasing the unevenness of the sliding surface of overhead rigid conductor lines.

  4. Longitudinal Acceleration Tests of Overhead Luggage Bins and Auxiliary Fuel Tank in a Transport Airplane Airframe Section

    National Research Council Canada - National Science Library

    McGuire, Robert

    1999-01-01

    This report contains the description and test results of overhead stowage bin calibrations and longitudinal impact testing of a 10-foot transport airframe section conducted at the Transportation Research Center Inc. (TRC...

  5. Shoulder External Rotation Fatigue and Scapular Muscle Activation and Kinematics in Overhead Athletes

    Science.gov (United States)

    Joshi, Mithun; Thigpen, Charles A.; Bunn, Kevin; Karas, Spero G.; Padua, Darin A.

    2011-01-01

    Context: Glenohumeral external rotation (GH ER) muscle fatigue might contribute to shoulder injuries in overhead athletes. Few researchers have examined the effect of such fatigue on scapular kinematics and muscle activation during a functional movement pattern. Objective: To examine the effects of GH ER muscle fatigue on upper trapezius, lower trapezius, serratus anterior, and infraspinatus muscle activation and to examine scapular kinematics during a diagonal movement task in overhead athletes. Setting: Human performance research laboratory. Design: Descriptive laboratory study. Patients or Other Participants: Our study included 25 overhead athletes (15 men, 10 women; age = 20 ± 2 years, height = 180 ± 11 cm, mass = 80 ± 11 kg) without a history of shoulder pain on the dominant side. Interventions: We tested the healthy, dominant shoulder through a diagonal movement task before and after a fatiguing exercise involving low-resistance, high-repetition, prone GH ER from 0° to 75° with the shoulder in 90° of abduction. Main Outcome Measure(s): Surface electromyography was used to measure muscle activity for the upper trapezius, lower trapezius, serratus anterior, and infraspinatus. An electromyographic motion analysis system was used to assess 3-dimensional scapular kinematics. Repeated-measures analyses of variance (phase × condition) were used to test for differences. Results: We found a decrease in ascending-phase and descending-phase lower trapezius activity (F1,25 = 5.098, P = .03) and an increase in descending-phase infraspinatus activity (F1,25 = 5.534, P = .03) after the fatigue protocol. We also found an increase in scapular upward rotation (F1,24 = 3.7, P = .04) postfatigue. Conclusions: The GH ER muscle fatigue protocol used in this study caused decreased lower trapezius and increased infraspinatus activation concurrent with increased scapular upward rotation range of motion during the functional task. This highlights the interdependence of scapular

  6. Conductor Temperature Estimation and Prediction at Thermal Transient State in Dynamic Line Rating Application

    DEFF Research Database (Denmark)

    Alvarez, David L.; Silva, Filipe Miguel Faria da; Mombello, Enrique Esteban

    2018-01-01

    . This paper presents an algorithm to estimate and predict the temperature in overhead line conductors using an Extended Kalman Filter. The proposed algorithm assumes both actual weather and current intensity flowing along the conductor as control variables. The temperature of the conductor, mechanical tension...

  7. Comparison of sliding friction and wear behaviour of overhead conveyor steels tested under dry and lubrication conditions

    International Nuclear Information System (INIS)

    Castro-Regal, G.; Fernandez-Vicente, A.; Martinez, M. A.

    2005-01-01

    The sliding friction and wear behaviour of different steel qualities were investigated with and without lubrication conditions. Steel qualities tested are normally used in the overhead conveyor system of many industrial fields, like the automotive sector. Sliding wear tests have been conducted by means of a pin-on-disk machine. A 100Cr6 steel similar to that used within the overhead conveyor trolleys has been employed as a pin. Friction coefficient values obtained under lubrication conditions were three times smaller than those obtained without lubrication. The mechanism that controls wear behaviour under lubrication conditions is an abrasive one and the wear values obtained are almost worthless. On the other hand, mechanism controlling wear during non lubrication tests, was a combination of abrasion and adhesion. (Author) 20 refs

  8. Audio-frequency noise emissions from high-voltage overhead power lines

    International Nuclear Information System (INIS)

    Semmler, M.; Straumann, U.; Roero, C.; Teich, T. H.

    2005-01-01

    This article discusses the noise-emissions caused by high-voltage overhead power lines that can occur under certain atmospheric conditions. These emissions, caused by electric discharges around the conductors, can achieve disturbing values, depending on the conditions prevailing at the time in question. The causes of the discharges are examined and the ionisation processes involved are looked at. The parameters influencing the discharges are discussed and measures that can be taken to reduce such audio-frequency emissions are looked at. The authors note that a reduction of peripheral field strengths can reduce emissions and that hydrophilic coatings can lead to faster reduction of such effects after rainfall

  9. A technique for estimating 4D-CBCT using prior knowledge and limited-angle projections

    International Nuclear Information System (INIS)

    Zhang, You; Yin, Fang-Fang; Ren, Lei; Segars, W. Paul

    2013-01-01

    Purpose: To develop a technique to estimate onboard 4D-CBCT using prior information and limited-angle projections for potential 4D target verification of lung radiotherapy.Methods: Each phase of onboard 4D-CBCT is considered as a deformation from one selected phase (prior volume) of the planning 4D-CT. The deformation field maps (DFMs) are solved using a motion modeling and free-form deformation (MM-FD) technique. In the MM-FD technique, the DFMs are estimated using a motion model which is extracted from planning 4D-CT based on principal component analysis (PCA). The motion model parameters are optimized by matching the digitally reconstructed radiographs of the deformed volumes to the limited-angle onboard projections (data fidelity constraint). Afterward, the estimated DFMs are fine-tuned using a FD model based on data fidelity constraint and deformation energy minimization. The 4D digital extended-cardiac-torso phantom was used to evaluate the MM-FD technique. A lung patient with a 30 mm diameter lesion was simulated with various anatomical and respirational changes from planning 4D-CT to onboard volume, including changes of respiration amplitude, lesion size and lesion average-position, and phase shift between lesion and body respiratory cycle. The lesions were contoured in both the estimated and “ground-truth” onboard 4D-CBCT for comparison. 3D volume percentage-difference (VPD) and center-of-mass shift (COMS) were calculated to evaluate the estimation accuracy of three techniques: MM-FD, MM-only, and FD-only. Different onboard projection acquisition scenarios and projection noise levels were simulated to investigate their effects on the estimation accuracy.Results: For all simulated patient and projection acquisition scenarios, the mean VPD (±S.D.)/COMS (±S.D.) between lesions in prior images and “ground-truth” onboard images were 136.11% (±42.76%)/15.5 mm (±3.9 mm). Using orthogonal-view 15°-each scan angle, the mean VPD/COMS between the lesion

  10. Projected metastable Markov processes and their estimation with observable operator models

    International Nuclear Information System (INIS)

    Wu, Hao; Prinz, Jan-Hendrik; Noé, Frank

    2015-01-01

    The determination of kinetics of high-dimensional dynamical systems, such as macromolecules, polymers, or spin systems, is a difficult and generally unsolved problem — both in simulation, where the optimal reaction coordinate(s) are generally unknown and are difficult to compute, and in experimental measurements, where only specific coordinates are observable. Markov models, or Markov state models, are widely used but suffer from the fact that the dynamics on a coarsely discretized state spaced are no longer Markovian, even if the dynamics in the full phase space are. The recently proposed projected Markov models (PMMs) are a formulation that provides a description of the kinetics on a low-dimensional projection without making the Markovianity assumption. However, as yet no general way of estimating PMMs from data has been available. Here, we show that the observed dynamics of a PMM can be exactly described by an observable operator model (OOM) and derive a PMM estimator based on the OOM learning

  11. An estimation method of the direct benefit of a waterlogging control project applicable to the changing environment

    Science.gov (United States)

    Zengmei, L.; Guanghua, Q.; Zishen, C.

    2015-05-01

    The direct benefit of a waterlogging control project is reflected by the reduction or avoidance of waterlogging loss. Before and after the construction of a waterlogging control project, the disaster-inducing environment in the waterlogging-prone zone is generally different. In addition, the category, quantity and spatial distribution of the disaster-bearing bodies are also changed more or less. Therefore, under the changing environment, the direct benefit of a waterlogging control project should be the reduction of waterlogging losses compared to conditions with no control project. Moreover, the waterlogging losses with or without the project should be the mathematical expectations of the waterlogging losses when rainstorms of all frequencies meet various water levels in the drainage-accepting zone. So an estimation model of the direct benefit of waterlogging control is proposed. Firstly, on the basis of a Copula function, the joint distribution of the rainstorms and the water levels are established, so as to obtain their joint probability density function. Secondly, according to the two-dimensional joint probability density distribution, the dimensional domain of integration is determined, which is then divided into small domains so as to calculate the probability for each of the small domains and the difference between the average waterlogging loss with and without a waterlogging control project, called the regional benefit of waterlogging control project, under the condition that rainstorms in the waterlogging-prone zone meet the water level in the drainage-accepting zone. Finally, it calculates the weighted mean of the project benefit of all small domains, with probability as the weight, and gets the benefit of the waterlogging control project. Taking the estimation of benefit of a waterlogging control project in Yangshan County, Guangdong Province, as an example, the paper briefly explains the procedures in waterlogging control project benefit estimation. The

  12. Estimating customer electricity savings from projects installed by the U.S. ESCO industry

    Energy Technology Data Exchange (ETDEWEB)

    Carvallo, Juan Pablo [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); Larsen, Peter H. [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United States)

    2014-11-25

    The U.S. energy service company (ESCO) industry has a well-established track record of delivering substantial energy and dollar savings in the public and institutional facilities sector, typically through the use of energy savings performance contracts (ESPC) (Larsen et al. 2012; Goldman et al. 2005; Hopper et al. 2005, Stuart et al. 2013). This ~$6.4 billion industry, which is expected to grow significantly over the next five years, may play an important role in achieving demand-side energy efficiency under local/state/federal environmental policy goals. To date, there has been little or no research in the public domain to estimate electricity savings for the entire U.S. ESCO industry. Estimating these savings levels is a foundational step in order to determine total avoided greenhouse gas (GHG) emissions from demand-side energy efficiency measures installed by U.S. ESCOs. We introduce a method to estimate the total amount of electricity saved by projects implemented by the U.S. ESCO industry using the Lawrence Berkeley National Laboratory (LBNL) /National Association of Energy Service Companies (NAESCO) database of projects and LBNL’s biennial industry survey. We report two metrics: incremental electricity savings and savings from ESCO projects that are active in a given year (e.g., 2012). Overall, we estimate that in 2012 active U.S. ESCO industry projects generated about 34 TWh of electricity savings—15 TWh of these electricity savings were for MUSH market customers who did not rely on utility customer-funded energy efficiency programs (see Figure 1). This analysis shows that almost two-thirds of 2012 electricity savings in municipal, local and state government facilities, universities/colleges, K-12 schools, and healthcare facilities (i.e., the so-called “MUSH” market) were not supported by a utility customer-funded energy efficiency program.

  13. Effects of Kinesio taping on scapular kinematics of overhead athletes following muscle fatigue.

    Science.gov (United States)

    Zanca, Gisele Garcia; Grüninger, Bruno; Mattiello, Stela Márcia

    2016-08-01

    Scapular kinematics alterations have been found following muscle fatigue. Considering the importance of the lower trapezius in coordinated scapular movement, this study aimed to investigate the effects of elastic taping (Kinesio taping, KT) for muscle facilitation on scapular kinematics of healthy overhead athletes following muscle fatigue. Twenty-eight athletes were evaluated in a crossover, single-blind, randomized design, in three sessions: control (no taping), KT (KT with tension) and sham (KT without tension). Scapular tridimensional kinematics and EMG of clavicular and acromial portions of upper trapezius, lower trapezius and serratus anterior were evaluated during arm elevation and lowering, before and after a fatigue protocol involving repetitive throwing. Median power frequency decline of serratus anterior was significantly lower in KT session compared to sham, possibly indicating lower muscle fatigue. However, the effects of muscle fatigue on scapular kinematics were not altered by taping conditions. Although significant changes were found in scapular kinematics following muscle fatigue, they were small and not considered relevant. It was concluded that healthy overhead athletes seem to present an adaptive mechanism that avoids the disruption of scapular movement pattern following muscle fatigue. Therefore, these athletes do not benefit from the use of KT to assist scapular movement under the conditions tested. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. S-22: Upper Extremity Plyometric Training for the Pediatric Overhead Athletes; Randomized Controled Trial

    Directory of Open Access Journals (Sweden)

    Elif Turgut

    2017-03-01

    Full Text Available INTRODUCTION/ PURPOSE: The purpose of the current study was to investigate the effects of a 12-week upper extremity plyometric training program on upper body explosive power, strength and endurance in pediatric overhead athletes.MATERIALS-METHOD: Twenty-eight female pediatric volleyball players participated in the study. The participants were randomly divided into two study groups: an intervention group (upper extremity plyometric training, n = 14 and a control group (n = 14. All of the participants were assessed before and after a 12-week training program for upper body explosive power, strength and endurance. Statistical comparison was performed using an analysis of variance test. FINDINGS: Comparisons showed that after a 12-week training program, the upper body plyometric training program resulted in more improvements in an overhead medicine-ball throwing distance and a push-up performance when compared to control training. DISCUSSION / CONCLUSION: Compared to regular training, upper body plyometric training resulted in additional improvements in upper body power and strength and endurance among female pediatric volleyball players. The findings of the study provide a basis for developing training protocols for pediatric volleyball players.

  15. Switching overvoltage when disconnecting a combined 400 kVcable/overhead line with permanently connected shunt reactor

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Søgaard, Kim

    2008-01-01

    400 kV power system and initiated by Danish TSO Energinet.dk after having measured the voltage of the cable/overhead line after disconnection. A particular decaying dynamic phase voltage containing voltages higher than the voltage before disconnection appeared. A simulation model for the entire system...

  16. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Daniel

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlife species incurring positive impacts attributable to the project were identified.

  17. The Influence of Overhead Cranes in the Seismic Performance of Industrial Buildings

    Directory of Open Access Journals (Sweden)

    Andrea Belleri

    2017-11-01

    Full Text Available This paper investigates the influence of overhead cranes with a hanging mass under earthquake type loading, considering the Emilia 2012 seismic sequence. The structural layout of precast concrete industrial buildings typical of the Italian territory is considered. The equations of motion describing the behavior of the hoist load are derived, and a sensitivity analysis is carried out on simplified 3 degrees of freedom systems by solving the governing differential equations. The influence of various parameters on the roof displacement and on the horizontal load transferred by the hanging mass is addressed. The considered parameters are the relative damping of the hanging mass, the length of the hoist ropes, the earthquake record, the hysteretic type of the plastic hinges at the column base, and the behavior factor of the structural system. The results show that for a horizontal component of the considered seismic sequence the structural displacements are amplified in the case of a behavior factor greater than 2.5. A simplified modeling strategy considering small displacements is also investigated. Such model is suitable for response-spectrum analyses. Finally, a three-dimensional case study is analyzed by means of non-linear time history analyses. The results show the influence of the overhead crane on the local performance of some structural and non-structural elements, such as columns and cladding panels, especially when the assumption of rigid roof diaphragm does not apply.

  18. Postural stability is compromised by fatiguing overhead work.

    Science.gov (United States)

    Nussbaum, Maury A

    2003-01-01

    In a laboratory setting, 16 participants performed a repetitive overhead tapping task for 3 hours or until self-terminated due to substantial shoulder discomfort. Several measures of postural sway and stability were obtained using a force plate, both during quiet standing and during performance of the tapping task. Sway area and peak sway velocity showed consistent increases with time, whereas changes in average velocity and peak whole-body center-of-mass acceleration were either small or nonsignificant. Although relatively insensitive to several task variables, changes in sway areas and peak velocities were substantially larger in trials terminated by the participants. It is argued that fatigue plays a more important role than simple task duration in causing the observed increases in sway, and hence decreases in postural stability. Potential whole-body consequences of localized musculoskeletal stresses appear supported by the results, and implications for safety, risks of falls, and work scheduling are discussed.

  19. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Science.gov (United States)

    2010-07-01

    ... (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH... possibility of operator injury resulting from overhead hazards such as flying and falling objects, and at the... used in construction work (see 29 CFR 1926.1002(b) and (j)). In the case of machines to which 29 CFR...

  20. Estimation of metallic structure durability for a known law of stress variation

    Science.gov (United States)

    Mironov, V. I.; Lukashuk, O. A.; Ogorelkov, D. A.

    2017-12-01

    Overload of machines working in transient operational modes leads to such stresses in their bearing metallic structures that considerably exceed the endurance limit. The estimation of fatigue damages based on linear summation offers a more accurate prediction in terms of machine durability. The paper presents an alternative approach to the estimation of the factors of the cyclic degradation of a material. Free damped vibrations of the bridge girder of an overhead crane, which follow a known logarithmical decrement, are studied. It is shown that taking into account cyclic degradation substantially decreases the durability estimated for a product.

  1. Rational Choice of the Investment Project Using Interval Estimates of the Initial Parameters

    Directory of Open Access Journals (Sweden)

    Kotsyuba Oleksiy S.

    2016-11-01

    Full Text Available The article is dedicated to the development of instruments to support decision-making on the problem of choosing the best investment project in a situation when initial quantitative parameters of the considered investment alternatives are described by interval estimates. In terms of managing the risk caused by interval uncertainty of the initial data, the study is limited to the component (aspect of risk measure as a degree of possibility of discrepancy between the resulting economic indicator (criterion and its normative level (the norm. An important hypothesis used as a basis for the proposed in the work formalization of the problem under consideration is the presence – for some or all of the projects from which the choice is made – of risk of poor rate of return in terms of net present (current value. Based upon relevant developments within the framework of the fuzzy-set methodology and interval analysis, there formulated a model for choosing an optimal investment project from the set of alternative options for the interval formulation of the problem. In this case it is assumed that indicators of economic attractiveness (performance of the compared directions of real investment are described either by interval estimates or possibility distribution functions. With the help of the estimated conditional example there implemented an approbation of the proposed model, which demonstrated its practical viability.

  2. A Novel wave-form command shaper for overhead cranes

    Directory of Open Access Journals (Sweden)

    KHALED ALHAZZA

    2013-12-01

    Full Text Available In this work, a novel command shaping control strategy for oscillation reduction of simple harmonic oscillators is proposed, and validated experimentally. A wave-form acceleration command shaper is derived analytically. The performance of the proposed shaper is simulated numerically, and validated experimentally on a scaled model of an overhead crane. Amplitude modulation is used to enhance the shaper performance, which results in a modulated wave-form command shaper. It is determined that the proposed wave-form and modulated wave-form command shaper profiles are capable of eliminating travel and residual oscillations. Furthermore, unlike traditional impulse and step command shapers, the proposed command shaper has piecewise smoother acceleration, velocity, and displacement profiles. Experimental results using continuous and discrete commands are presented. Experiments with discrete commands involved embedding a saturation model-based feedback in the algorithm of the command shaper.

  3. Interlaboratory comparison of measuring results of magnetic field near 400 kV overhead power line

    Directory of Open Access Journals (Sweden)

    Grbić Maja

    2012-01-01

    Full Text Available The paper presents a comparison of measured results of magnetic field near 400 kV overhead power lines obtained by three laboratories. This interlaboratory comparison was performed to ensure confidence in the quality of the test results. The measured results were analyzed with standard methods, using En number, based on which the evaluation of the laboratories was performed.

  4. Longitudinal Acceleration Test of Overhead Luggage Bins and Auxiliary Fuel Tank in a Transport Airplane Airframe Section, Part 2

    National Research Council Canada - National Science Library

    McGuire, Robert

    2000-01-01

    This report contains the description and test results of overhead stowage bin calibrations and longitudinal impact testing of a 10-foot transport airframe section conducted at the Transportation Research Center Inc. (TRC...

  5. Comparing avian and bat fatality rate estimates among North American wind energy projects

    Energy Technology Data Exchange (ETDEWEB)

    Smallwood, Shawn

    2011-07-01

    Full text: Wind energy development has expanded rapidly, and so have concerns over bird and bat impacts caused by wind turbines. To assess and compare impacts due to collisions, investigators use a common metric, fatalities/MW/year, but estimates of fatality rates have come from various wind turbine models, tower heights, environments, fatality search methods, and analytical methods. To improve comparability and asses large-scale impacts, I applied a common set of assumptions and methods to data in fatality monitoring reports to estimate fatality rates of birds and bats at 71 wind projects across North America (52 outside the Altamont Pass Wind Resource Area, APWRA). The data were from wind turbines of 27 sizes (range 0.04-3.00 MW) and 28 tower heights (range 18.5-90 m), and searched at 40 periodic intervals (range 1-90 days) and out to 20 distances from turbines (range 30-126 m). Estimates spanned the years 1982 to 2010, and involved 1-1,345 turbines per unique combination of project, turbine size, tower height, and search methodology. I adjusted fatality rates for search detection rates averaged from 425 detection trials, and for scavenger removal rates based on 413 removal trials. I also adjusted fatality rates for turbine tower height and maximum search radius, based on logistic functions fit to cumulative counts of carcasses that were detected at 1-m distance intervals from the turbine. For each tower height, I estimated the distance at which cumulative carcass counts reached an asymptote, and for each project I calculated the proportion of fatalities likely not found due to the maximum search radius being short of the model-predicted distance asymptote. I used the same estimator in all cases. I estimated mean fatalities/MW/year among North American wind projects at 12.6 bats (80% CI: 8.1-17.1) and 11.1 birds (80% CI: 9.5-12.7), including 1.6 raptors (80% CI: 1.3-2.0), and excluding the Altamont Pass I estimated fatality rates at 17.2 bats (80% CI: 9

  6. An improved input shaping design for an efficient sway control of a nonlinear 3D overhead crane with friction

    Science.gov (United States)

    Maghsoudi, Mohammad Javad; Mohamed, Z.; Sudin, S.; Buyamin, S.; Jaafar, H. I.; Ahmad, S. M.

    2017-08-01

    This paper proposes an improved input shaping scheme for an efficient sway control of a nonlinear three dimensional (3D) overhead crane with friction using the particle swarm optimization (PSO) algorithm. Using this approach, a higher payload sway reduction is obtained as the input shaper is designed based on a complete nonlinear model, as compared to the analytical-based input shaping scheme derived using a linear second order model. Zero Vibration (ZV) and Distributed Zero Vibration (DZV) shapers are designed using both analytical and PSO approaches for sway control of rail and trolley movements. To test the effectiveness of the proposed approach, MATLAB simulations and experiments on a laboratory 3D overhead crane are performed under various conditions involving different cable lengths and sway frequencies. Their performances are studied based on a maximum residual of payload sway and Integrated Absolute Error (IAE) values which indicate total payload sway of the crane. With experiments, the superiority of the proposed approach over the analytical-based is shown by 30-50% reductions of the IAE values for rail and trolley movements, for both ZV and DZV shapers. In addition, simulations results show higher sway reductions with the proposed approach. It is revealed that the proposed PSO-based input shaping design provides higher payload sway reductions of a 3D overhead crane with friction as compared to the commonly designed input shapers.

  7. Projection-based circular constrained state estimation and fusion over long-haul links

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Qiang [ORNL; Rao, Nageswara S. [ORNL

    2017-07-01

    In this paper, we consider a scenario where sensors are deployed over a large geographical area for tracking a target with circular nonlinear constraints on its motion dynamics. The sensor state estimates are sent over long-haul networks to a remote fusion center for fusion. We are interested in different ways to incorporate the constraints into the estimation and fusion process in the presence of communication loss. In particular, we consider closed-form projection-based solutions, including rules for fusing the estimates and for incorporating the constraints, which jointly can guarantee timely fusion often required in realtime systems. We test the performance of these methods in the long-haul tracking environment using a simple example.

  8. Improving value of travel time savings estimation for more effective transportation project evaluation.

    Science.gov (United States)

    2012-12-01

    Estimates of value of time (VOT) and value of travel time savings (VTTS) are critical elements in benefitcost : analyses of transportation projects and in developing congestion pricing policies. In addition, : differences in VTTS among various modes ...

  9. WE-EF-207-04: An Inter-Projection Sensor Fusion (IPSF) Approach to Estimate Missing Projection Signal in Synchronized Moving Grid (SMOG) System

    International Nuclear Information System (INIS)

    Zhang, H; Kong, V; Jin, J; Ren, L; Zhang, Y; Giles, W

    2015-01-01

    Purpose: A synchronized moving grid (SMOG) has been proposed to reduce scatter and lag artifacts in cone beam computed tomography (CBCT). However, information is missing in each projection because certain areas are blocked by the grid. A previous solution to this issue is acquiring 2 complimentary projections at each position, which increases scanning time. This study reports our first Result using an inter-projection sensor fusion (IPSF) method to estimate missing projection in our prototype SMOG-based CBCT system. Methods: An in-house SMOG assembling with a 1:1 grid of 3 mm gap has been installed in a CBCT benchtop. The grid moves back and forth in a 3-mm amplitude and up-to 20-Hz frequency. A control program in LabView synchronizes the grid motion with the platform rotation and x-ray firing so that the grid patterns for any two neighboring projections are complimentary. A Catphan was scanned with 360 projections. After scatter correction, the IPSF algorithm was applied to estimate missing signal for each projection using the information from the 2 neighboring projections. Feldkamp-Davis-Kress (FDK) algorithm was applied to reconstruct CBCT images. The CBCTs were compared to those reconstructed using normal projections without applying the SMOG system. Results: The SMOG-IPSF method may reduce image dose by half due to the blocked radiation by the grid. The method almost completely removed scatter related artifacts, such as the cupping artifacts. The evaluation of line pair patterns in the CatPhan suggested that the spatial resolution degradation was minimal. Conclusion: The SMOG-IPSF is promising in reducing scatter artifacts and improving image quality while reducing radiation dose

  10. WE-EF-207-04: An Inter-Projection Sensor Fusion (IPSF) Approach to Estimate Missing Projection Signal in Synchronized Moving Grid (SMOG) System

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, H; Kong, V; Jin, J [Georgia Regents University Cancer Center, Augusta, GA (Georgia); Ren, L; Zhang, Y; Giles, W [Duke University Medical Center, Durham, NC (United States)

    2015-06-15

    Purpose: A synchronized moving grid (SMOG) has been proposed to reduce scatter and lag artifacts in cone beam computed tomography (CBCT). However, information is missing in each projection because certain areas are blocked by the grid. A previous solution to this issue is acquiring 2 complimentary projections at each position, which increases scanning time. This study reports our first Result using an inter-projection sensor fusion (IPSF) method to estimate missing projection in our prototype SMOG-based CBCT system. Methods: An in-house SMOG assembling with a 1:1 grid of 3 mm gap has been installed in a CBCT benchtop. The grid moves back and forth in a 3-mm amplitude and up-to 20-Hz frequency. A control program in LabView synchronizes the grid motion with the platform rotation and x-ray firing so that the grid patterns for any two neighboring projections are complimentary. A Catphan was scanned with 360 projections. After scatter correction, the IPSF algorithm was applied to estimate missing signal for each projection using the information from the 2 neighboring projections. Feldkamp-Davis-Kress (FDK) algorithm was applied to reconstruct CBCT images. The CBCTs were compared to those reconstructed using normal projections without applying the SMOG system. Results: The SMOG-IPSF method may reduce image dose by half due to the blocked radiation by the grid. The method almost completely removed scatter related artifacts, such as the cupping artifacts. The evaluation of line pair patterns in the CatPhan suggested that the spatial resolution degradation was minimal. Conclusion: The SMOG-IPSF is promising in reducing scatter artifacts and improving image quality while reducing radiation dose.

  11. Autonomous Inspection Robot for Power Transmission Lines Maintenance While Operating on the Overhead Ground Wires

    Directory of Open Access Journals (Sweden)

    Zheng Li

    2010-12-01

    Full Text Available This paper describes the development of a mobile robot capable of clearing such obstacles as counterweights, anchor clamps, and torsion tower. The mobile robot walks on overhead ground wires in 500KV power tower. Its ultimate purpose is to automate to inspect the defect of power transmission line. The robot with 13 motors is composed of two arms, two wheels, two claws, two wrists, etc. Each arm has 4 degree of freedom. Claws are also mounted on the arms. An embedded computer based on PC/104 is chosen as the core of control system. Visible light and thermal infrared cameras are installed to obtain the video and temperature information, and the communication system is based on wireless LAN TCP/IP protocol. A prototype robot was developed with careful considerations of mobility. The new sensor configuration is used for the claw to grasp the overhead ground wires. The bridge is installed in the torsion tower for the robot easy to cross obstacles. The new posture plan is proposed for obstacles cleaning in the torsion tower. Results of experiments demonstrate that the robot can be applied to execute the navigation and inspection tasks.

  12. Autonomous Inspection Robot for Power Transmission Lines Maintenance While Operating on the Overhead Ground Wires

    Directory of Open Access Journals (Sweden)

    Zheng Li

    2011-01-01

    Full Text Available This paper describes the development of a mobile robot capable of clearing such obstacles as counterweights, anchor clamps, and torsion tower. The mobile robot walks on overhead ground wires in 500KV power tower. Its ultimate purpose is to automate to inspect the defect of power transmission line. The robot with 13 motors is composed of two arms, two wheels, two claws, two wrists, etc. Each arm has 4 degree of freedom. Claws are also mounted on the arms. An embedded computer based on PC/104 is chosen as the core of control system. Visible light and thermal infrared cameras are installed to obtain the video and temperature information, and the communication system is based on wireless LAN TCP/IP protocol. A prototype robot was developed with careful considerations of mobility. The new sensor configuration is used for the claw to grasp the overhead ground wires. The bridge is installed in the torsion tower for the robot easy to cross obstacles. The new posture plan is proposed for obstacles cleaning in the torsion tower. Results of experiments demonstrate that the robot can be applied to execute the navigation and inspection tasks.

  13. Technical and economic data for overhead lines in high-voltage a. c. and d. c. transmission

    Energy Technology Data Exchange (ETDEWEB)

    1977-11-01

    For the study of 'High-power electricity transmission and distribution in densely populated areas' technical and economic data were compiled for high-voltage alternating current and direct current transmission. A modification of the overhead lines for transmitting higher powers is possible as required by means of higher rated transmission voltages, larger conductor cross-sections and a larger number of circuits installed on each mast. For the use of larger partial conductor cross-sections and of bundle conductors with more than 4 partial conductors, and also to use voltages higher than 380 kV, development work is requisite from the points of view of construction, installation, insulators and fittings. Further possible developments result from the use of new materials such as plastic insulators which make possible the use of more versatile shapes for application in heavy pollution, particulary for direct current overhead lines. By using insulating crossarms the width of path can be considerably reduced. Economic efficiency investigations show even today higher cost for such techniques compared with lines of earlier construction.

  14. A Novel Method Based on Oblique Projection Technology for Mixed Sources Estimation

    Directory of Open Access Journals (Sweden)

    Weijian Si

    2014-01-01

    Full Text Available Reducing the computational complexity of the near-field sources and far-field sources localization algorithms has been considered as a serious problem in the field of array signal processing. A novel algorithm caring for mixed sources location estimation based on oblique projection is proposed in this paper. The sources are estimated at two different stages and the sensor noise power is estimated and eliminated from the covariance which improve the accuracy of the estimation of mixed sources. Using the idea of compress, the range information of near-field sources is obtained by searching the partial area instead of the whole Fresnel area which can reduce the processing time. Compared with the traditional algorithms, the proposed algorithm has the lower computation complexity and has the ability to solve the two closed-spaced sources with high resolution and accuracy. The duplication of range estimation is also avoided. Finally, simulation results are provided to demonstrate the performance of the proposed method.

  15. Estimation of the Cartographic Projection and~its Application in Geoinformatics-habilitation thesis presentation

    Directory of Open Access Journals (Sweden)

    Tomáš Bayer

    2017-03-01

    Full Text Available Modern techniques for the map analysis allow for the creation of full or partial geometric reconstruction of its content. The projection is described by the set of estimated constant values: transformed pole position, standard parallel latitude, longitude of the central meridian, and a constant parameter. Analogously the analyzed map is represented by its constant values: auxiliary sphere radius, origin shifts, and angle of rotation. Several new methods denoted as M6-M9 for the estimation of an unknown map projection and its parameters differing in the number of determined parameters, reliability, robustness, and convergence have been developed. However, their computational demands are similar. Instead of directly measuring the dissimilarity of two projections, the analyzed map in an unknown projection and the image of the sphere in the well-known (i.e., analyzed projection are compared. Several distance functions for the similarity measurements based on the location as well as shape similarity approaches are proposed. An unconstrained global optimization problem poorly scaled, with large residuals, for the vector of unknown parameters is solved by the hybrid BFGS method. To avoid a slower convergence rate for small residual problems, it has the ability to switch between first- and second-order methods. Such an analysis is beneficial and interesting for historic, old, or current maps without information about the projection. Its importance is primarily referred to refinement of spatial georeference for the medium- and small-scale maps, analysis of the knowledge about the former world, analysis of the incorrectly/inaccurately drawn regions, and appropriate cataloging of maps. The proposed algorithms have been implemented in the new version of the detectproj software.

  16. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  17. Speculative resources of uranium. A review of International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983

    International Nuclear Information System (INIS)

    1983-01-01

    On a country by country basis the International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983 are reviewed. Information provided includes exploration work, airborne survey, radiometric survey, gamma-ray spectrometric survey, estimate of speculative resources, uranium occurrences, uranium deposits, uranium mineralization, agreements for uranium exploration, feasibilities studies, geological classification of resources, proposed revised resource range, production estimate of uranium

  18. Rock mass mechanical property estimations for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Lin, M.; Hardy, M.P.; Bauer, S.J.

    1993-06-01

    Rock mass mechanical properties are important in the design of drifts and ramps. These properties are used in evaluations of the impacts of thermomechanical loading of potential host rock within the Yucca Mountain Site Characterization Project. Representative intact rock and joint mechanical properties were selected for welded and nonwelded tuffs from the currently available data sources. Rock mass qualities were then estimated using both the Norwegian Geotechnical Institute (Q) and Geomechanics Rating (RMR) systems. Rock mass mechanical properties were developed based on estimates of rock mass quality, the current knowledge of intact properties, and fracture/joint characteristics. Empirical relationships developed to correlate the rock mass quality indices and the rock mass mechanical properties were then used to estimate the range of rock mass mechanical properties

  19. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  20. Religious affiliation at time of death - Global estimates and projections.

    Science.gov (United States)

    Skirbekk, Vegard; Todd, Megan; Stonawski, Marcin

    2018-03-01

    Religious affiliation influences societal practices regarding death and dying, including palliative care, religiously acceptable health service procedures, funeral rites and beliefs about an afterlife. We aimed to estimate and project religious affiliation at the time of death globally, as this information has been lacking. We compiled data on demographic information and religious affiliation from more than 2500 surveys, registers and censuses covering 198 nations/territories. We present estimates of religious affiliation at the time of death as of 2010, projections up to and including 2060, taking into account trends in mortality, religious conversion, intergenerational transmission of religion, differential fertility, and gross migration flows, by age and sex. We find that Christianity continues to be the most common religion at death, although its share will fall from 37% to 31% of global deaths between 2010 and 2060. The share of individuals identifying as Muslim at the time of death increases from 21% to 24%. The share of religiously unaffiliated will peak at 17% in 2035 followed by a slight decline thereafter. In specific regions, such as Europe, the unaffiliated share will continue to rises from 14% to 21% throughout the period. Religious affiliation at the time of death is changing globally, with distinct regional patterns. This could affect spatial variation in healthcare and social customs relating to death and dying.

  1. Business Activity Monitoring: Real-Time Group Goals and Feedback Using an Overhead Scoreboard in a Distribution Center

    Science.gov (United States)

    Goomas, David T.; Smith, Stuart M.; Ludwig, Timothy D.

    2011-01-01

    Companies operating large industrial settings often find delivering timely and accurate feedback to employees to be one of the toughest challenges they face in implementing performance management programs. In this report, an overhead scoreboard at a retailer's distribution center informed teams of order selectors as to how many tasks were…

  2. Comparing the Overhead of Lock-based and Lock-free Implementations of Priority Queues

    DEFF Research Database (Denmark)

    Passas, Stavros; Karlsson, Sven

    2011-01-01

    . In this paper, we compare a lock-free implementation of a priority queue with a lock-based implementation. We perform experiments with processors of different generations and observe large performance differences for lock-free data structures depending on the processor generation. The lock-free implementation...... performs much better on the most recent processor generation. We investigate this performance trend, using a set of micro-benchmarks and show a significant difference in the overhead of atomic operations between processor generations. The lock-free implementation executes approximately three times as many...

  3. Camera-pose estimation via projective Newton optimization on the manifold.

    Science.gov (United States)

    Sarkis, Michel; Diepold, Klaus

    2012-04-01

    Determining the pose of a moving camera is an important task in computer vision. In this paper, we derive a projective Newton algorithm on the manifold to refine the pose estimate of a camera. The main idea is to benefit from the fact that the 3-D rigid motion is described by the special Euclidean group, which is a Riemannian manifold. The latter is equipped with a tangent space defined by the corresponding Lie algebra. This enables us to compute the optimization direction, i.e., the gradient and the Hessian, at each iteration of the projective Newton scheme on the tangent space of the manifold. Then, the motion is updated by projecting back the variables on the manifold itself. We also derive another version of the algorithm that employs homeomorphic parameterization to the special Euclidean group. We test the algorithm on several simulated and real image data sets. Compared with the standard Newton minimization scheme, we are now able to obtain the full numerical formula of the Hessian with a 60% decrease in computational complexity. Compared with Levenberg-Marquardt, the results obtained are more accurate while having a rather similar complexity.

  4. A New Pose Estimation Algorithm Using a Perspective-Ray-Based Scaled Orthographic Projection with Iteration.

    Directory of Open Access Journals (Sweden)

    Pengfei Sun

    Full Text Available Pose estimation aims at measuring the position and orientation of a calibrated camera using known image features. The pinhole model is the dominant camera model in this field. However, the imaging precision of this model is not accurate enough for an advanced pose estimation algorithm. In this paper, a new camera model, called incident ray tracking model, is introduced. More importantly, an advanced pose estimation algorithm based on the perspective ray in the new camera model, is proposed. The perspective ray, determined by two positioning points, is an abstract mathematical equivalent of the incident ray. In the proposed pose estimation algorithm, called perspective-ray-based scaled orthographic projection with iteration (PRSOI, an approximate ray-based projection is calculated by a linear system and refined by iteration. Experiments on the PRSOI have been conducted, and the results demonstrate that it is of high accuracy in the six degrees of freedom (DOF motion. And it outperforms three other state-of-the-art algorithms in terms of accuracy during the contrast experiment.

  5. [Doctoral thesis projects for medical students? Retrospective estimation of the fraction of successfully completed medical doctoral thesis projects at Witten/Herdecke University].

    Science.gov (United States)

    Scharfenberg, Janna; Schaper, Katharina; Krummenauer, Frank

    2014-01-01

    The German "Dr med" plays a specific role in doctoral thesis settings since students may start the underlying doctoral project during their studies at medical school. If a Medical Faculty principally encourages this approach, then it should support the students in performing the respective projects as efficiently as possible. Consequently, it must be ensured that students are able to implement and complete a doctoral project in parallel to their studies. As a characteristic efficiency feature of these "Dr med" initiatives, the proportion of doctoral projects successfully completed shortly after graduating from medical school is proposed and illustrated. The proposed characteristic can be estimated by the time period between the state examination (date of completion of the qualifying medical examination) and the doctoral examination. Completion of the doctoral project "during their medical studies" was then characterised by a doctoral examination no later than 12 months after the qualifying medical state examination. To illustrate the estimation and interpretation of this characteristic, it was retrospectively estimated on the basis of the full sample of all doctorates successfully completed between July 2009 and June 2012 at the Department of Human Medicine at the Faculty of Health of the University of Witten/Herdecke. During the period of investigation defined, a total number of 56 doctoral examinations were documented, 30 % of which were completed within 12 months after the qualifying medical state examination (95% confidence interval 19 to 44 %). The median duration between state and doctoral examination was 27 months. The proportion of doctoral projects completed parallel to the medical studies increased during the investigation period from 14 % in the first year (July 2009 till June 2010) to 40 % in the third year (July 2011 till June 2012). Only about a third of all "Dr med" projects at the Witten/Herdecke Faculty of Health were completed during or close to

  6. 32 CFR 37.560 - Must I be able to estimate project expenditures precisely in order to justify use of a fixed...

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Must I be able to estimate project expenditures... I be able to estimate project expenditures precisely in order to justify use of a fixed-support TIA... purposes of this illustration, let that minimum recipient cost sharing be 40% of the total project costs...

  7. A Framework of Combining Case-Based Reasoning with a Work Breakdown Structure for Estimating the Cost of Online Course Production Projects

    Science.gov (United States)

    He, Wu

    2014-01-01

    Currently, a work breakdown structure (WBS) approach is used as the most common cost estimation approach for online course production projects. To improve the practice of cost estimation, this paper proposes a novel framework to estimate the cost for online course production projects using a case-based reasoning (CBR) technique and a WBS. A…

  8. THE IMPROVEMENT OF ESTIMATION TECHNIQUE FOR EFFECTIVENESS OF INVESTMENT PROJECTS ON WASTE UTILIZATION

    Directory of Open Access Journals (Sweden)

    V.V. Krivorotov

    2008-06-01

    Full Text Available The main tendencies of the waste products formation and recycling in the Russian Federation and in the Sverdlovsk region have been analyzed and the principal factors restraining the inclusion of anthropogenic formations into the economic circulation have been revealed in the work. A technical approach to the estimation of both ecological and economic integral efficiency of the recycling projects that, in autors, opinion, secures higher objectivity of this estimation as well as the validity of the made decisions on their realization.

  9. Analysis the Appropriate using Standard Costing Applying in Land Cost Component of Real Estate Development Activities: A Case Study of PT Subur Agung

    Directory of Open Access Journals (Sweden)

    Elfrida Yanti

    2011-05-01

    Full Text Available Standard cost is generally used by manufacturing business, which direct material, labor, and factory overhead are cleared allocated. On real estate business in this case PT Subur Agung use standard cost based on three costs, raw land, land improvement and interest expense categories instead of direct material, direct labor and overhead. Developer use these cost to predict the project cost and estimate the pre-selling price, in accordance with the cost estimation classification matrix, the variance range is in the expected accuracy rate by testing the variance percentage between standard cost and actual cost. The additional similar projects in PT Subur Agung also follow the same scope. All these evidences have proved the appropriate using standard costing in land cost component of real estate development activities but how it applies this article will analyze in this particular project with using descriptive and exploratory method. The analysis started by knowing the conceptual situation of PT Subur Agung and the data was presented in tables and calculation with detail explanation. 

  10. Growth, gas exchange, foliar nitrogen content, and water use of subirrigated and overhead irrigated Populus tremuloides Michx. seedlings

    Science.gov (United States)

    Anthony S. Davis; Matthew M. Aghai; Jeremiah R. Pinto; Kent G. Apostal

    2011-01-01

    Because limitations on water used by container nurseries has become commonplace, nursery growers will have to improve irrigation management. Subirrigation systems may provide an alternative to overhead irrigation systems by mitigating groundwater pollution and excessive water consumption. Seedling growth, gas exchange, leaf nitrogen (N) content, and water use were...

  11. Estimating Climatological Bias Errors for the Global Precipitation Climatology Project (GPCP)

    Science.gov (United States)

    Adler, Robert; Gu, Guojun; Huffman, George

    2012-01-01

    A procedure is described to estimate bias errors for mean precipitation by using multiple estimates from different algorithms, satellite sources, and merged products. The Global Precipitation Climatology Project (GPCP) monthly product is used as a base precipitation estimate, with other input products included when they are within +/- 50% of the GPCP estimates on a zonal-mean basis (ocean and land separately). The standard deviation s of the included products is then taken to be the estimated systematic, or bias, error. The results allow one to examine monthly climatologies and the annual climatology, producing maps of estimated bias errors, zonal-mean errors, and estimated errors over large areas such as ocean and land for both the tropics and the globe. For ocean areas, where there is the largest question as to absolute magnitude of precipitation, the analysis shows spatial variations in the estimated bias errors, indicating areas where one should have more or less confidence in the mean precipitation estimates. In the tropics, relative bias error estimates (s/m, where m is the mean precipitation) over the eastern Pacific Ocean are as large as 20%, as compared with 10%-15% in the western Pacific part of the ITCZ. An examination of latitudinal differences over ocean clearly shows an increase in estimated bias error at higher latitudes, reaching up to 50%. Over land, the error estimates also locate regions of potential problems in the tropics and larger cold-season errors at high latitudes that are due to snow. An empirical technique to area average the gridded errors (s) is described that allows one to make error estimates for arbitrary areas and for the tropics and the globe (land and ocean separately, and combined). Over the tropics this calculation leads to a relative error estimate for tropical land and ocean combined of 7%, which is considered to be an upper bound because of the lack of sign-of-the-error canceling when integrating over different areas with a

  12. Projection-based Bayesian recursive estimation of ARX model with uniform innovations

    Czech Academy of Sciences Publication Activity Database

    Kárný, Miroslav; Pavelková, Lenka

    2007-01-01

    Roč. 56, 9/10 (2007), s. 646-655 ISSN 0167-6911 R&D Projects: GA AV ČR 1ET100750401; GA MŠk 2C06001; GA MDS 1F43A/003/120 Institutional research plan: CEZ:AV0Z10750506 Keywords : ARX model * Bayesian recursive estimation * Uniform distribution Subject RIV: BC - Control Systems Theory Impact factor: 1.634, year: 2007 http://dx.doi.org/10.1016/j.sysconle.2007.03.005

  13. EQPlanar: a maximum-likelihood method for accurate organ activity estimation from whole body planar projections

    International Nuclear Information System (INIS)

    Song, N; Frey, E C; He, B; Wahl, R L

    2011-01-01

    Optimizing targeted radionuclide therapy requires patient-specific estimation of organ doses. The organ doses are estimated from quantitative nuclear medicine imaging studies, many of which involve planar whole body scans. We have previously developed the quantitative planar (QPlanar) processing method and demonstrated its ability to provide more accurate activity estimates than conventional geometric-mean-based planar (CPlanar) processing methods using physical phantom and simulation studies. The QPlanar method uses the maximum likelihood-expectation maximization algorithm, 3D organ volume of interests (VOIs), and rigorous models of physical image degrading factors to estimate organ activities. However, the QPlanar method requires alignment between the 3D organ VOIs and the 2D planar projections and assumes uniform activity distribution in each VOI. This makes application to patients challenging. As a result, in this paper we propose an extended QPlanar (EQPlanar) method that provides independent-organ rigid registration and includes multiple background regions. We have validated this method using both Monte Carlo simulation and patient data. In the simulation study, we evaluated the precision and accuracy of the method in comparison to the original QPlanar method. For the patient studies, we compared organ activity estimates at 24 h after injection with those from conventional geometric mean-based planar quantification using a 24 h post-injection quantitative SPECT reconstruction as the gold standard. We also compared the goodness of fit of the measured and estimated projections obtained from the EQPlanar method to those from the original method at four other time points where gold standard data were not available. In the simulation study, more accurate activity estimates were provided by the EQPlanar method for all the organs at all the time points compared with the QPlanar method. Based on the patient data, we concluded that the EQPlanar method provided a

  14. Crossing Phenomena in Overhead Line Equipment (OHLE) Structure in 3D Space Considering Soil-Structure Interaction

    Science.gov (United States)

    Ngamkhanong, Chayut; Kaewunruen, Sakdirat; Baniotopoulos, Charalampos; Papaelias, Mayorkinos

    2017-10-01

    Nowadays, the electric train becomes one of the efficient railway systems that are lighter, cleaner, quieter, cheaper and faster than a conventional train. Overhead line equipment (OHLE), which supplies electric power to the trains, is designed on the principle of overhead wires placed over the railway track. The OHLE is supported by mast structure which located at the lineside along the track. Normally, mast structure is a steel column or truss structure which supports the overhead wire carrying the power. Due to the running train and severe periodic force, such as an earthquake, in surrounding area may cause damage to the OHLE structure especially mast structure which leads to the failure of the electrical system. The mast structure needs to be discussed in order to resist the random forces. Due to the vibration effect, the natural frequencies of the structure are necessary. This is because when the external applied force occurs within a range of frequency of the structure, resonance effect can be expected which lead to the large oscillations and deflections. The natural frequency of a system is dependent only on the stiffness of the structure and the mass which participates with the structure, including self-weight. The modal analysis is used in order to calculate the mode shapes and natural frequencies of the mast structure during free vibration. A mast structure with varying rotational soil stiffness is used to observe the influence of soil-structure action. It is common to use finite element analysis to perform a modal analysis. This paper presents the fundamental mode shapes, natural frequencies and crossing phenomena of three-dimensional mast structure considering soil-structure interaction. The sensitivity of mode shapes to the variation of soil-structure interaction is discussed. The outcome of this study will improve the understanding of the fundamental dynamic behaviour of the mast structure which supports the OHLE. Moreover, this study will be a

  15. Channel Selection and Feature Projection for Cognitive Load Estimation Using Ambulatory EEG

    Directory of Open Access Journals (Sweden)

    Tian Lan

    2007-01-01

    Full Text Available We present an ambulatory cognitive state classification system to assess the subject's mental load based on EEG measurements. The ambulatory cognitive state estimator is utilized in the context of a real-time augmented cognition (AugCog system that aims to enhance the cognitive performance of a human user through computer-mediated assistance based on assessments of cognitive states using physiological signals including, but not limited to, EEG. This paper focuses particularly on the offline channel selection and feature projection phases of the design and aims to present mutual-information-based techniques that use a simple sample estimator for this quantity. Analyses conducted on data collected from 3 subjects performing 2 tasks (n-back/Larson at 2 difficulty levels (low/high demonstrate that the proposed mutual-information-based dimensionality reduction scheme can achieve up to 94% cognitive load estimation accuracy.

  16. Estimating asbestos abatement projects: Excellence or 'You said I missed what'?

    International Nuclear Information System (INIS)

    Frawley, R.F.

    1992-01-01

    Between 1900 and 1980, 30 million tons of asbestos were put in place. Because of the known health hazards and increasing federal, state, and local regulations, building owners are now facing the problem of asbestos abatement. There are 4 basic approaches to dealing with asbestos: (1) removal, (2) enclosure, (3) encapsulation, (4) deferred action in conjunction with a well defined operations and maintenance program. Once the full extent of the problem is determined, the decision can be made on which action or combination of actions to take and begin estimating the cost of the asbestos abatement project. There are no high-tech methods of asbestos removal. It is hot, wet, labor intensive work, the ways of removal are archaic. Removal means man power and man hours, labor is a big ticket item, and is an important factor in cost estimating. Become very familiar with the scope of the project and be sure to fully understand the depth of the asbestos problem. The products, supplies, tools, and in some cases, the machines are all disposable items. If one overlooks something or underestimates the time involved for removal, not only will one be way off on material, the labor costs will soar. Be very observant on walk throughs, notice everything. Be sure to get clear, accurate test results on material to be removed. Once all this is done, one can make a good take off with confidence. Finally, when in doubt always remember the 11th commandment of asbestos abatement cost-estimating 'If thou can't figure it out hor-ellipsis thou best figure it in.'

  17. Cross-cultural adaptation of Kerlan-Jobe Orthopaedic Clinic shoulder and elbow score: Reliability and validity in Turkish-speaking overhead athletes.

    Science.gov (United States)

    Turgut, Elif; Tunay, Volga Bayrakci

    2018-03-09

    Kerlan-Jobe Orthopaedic Clinic Shoulder and Elbow Score (KJOC-SES) is a subjective assessment tool to measure functional status of the upper extremities in overhead athletes. The aim was to translate and culturally adapt the KJOC-SES and to evaluate the psychometric properties of the Turkish version (KJOC-SES-Tr) in overhead athletes. The forward and back-translation method was followed. One hundred and twenty-three overhead athletes completed the KJOC-SES-Tr, the Disabilities of the Arm, Shoulder, and Hand (DASH), and the American Shoulder and Elbow Surgeons Evaluation Form (ASES). Participants were assigned to one of the following subgroups: asymptomatic (playing without pain) or symptomatic (playing with pain, or not playing due to pain). Internal consistency, reliability, construct validity, discriminant validity, and content validity of the KJOC-SES-Tr were tested. The test-retest reliability of the KJOC-SES-Tr was excellent with an interclass coefficient of 0.93. There was a strong correlation between the KJOC-SES-Tr and the DASH and the ASES, indicating that the construct validity was good for all participants. Results of the KJOC-SES-Tr significantly differed between different subgroups and categories of athletes. The floor and ceiling effects were acceptable for symptomatic athletes. The KJOC-SES-Tr was shown to be valid, reliable tool to monitor the return to sports following injuries in athletes. Copyright © 2018 Turkish Association of Orthopaedics and Traumatology. Production and hosting by Elsevier B.V. All rights reserved.

  18. Overhead Transmission Lines Deicing under Different Incentive Displacement

    Directory of Open Access Journals (Sweden)

    Qing He

    2014-01-01

    Full Text Available Overhead transmission line icing is one of the main factors affecting safety and reliability of power grid. This paper proposed an excitation deicing method of iced wire and theoretically revealed the ice removal mechanism under displacement excitation conditions, by taking the LGJ-70/10 glaze icing wire as the 3D model and analyzing and studying its dynamic response under the effect of displacement excitation. The simulation results show that the stress of wire icing area is enlarged with the increase of excitation displacement and frequency. Through the comparison of the compression strength experimental results on a series of different iced wires in low temperature environment, the authors found out that the stress generated from the wire icing area is greater than the crushing strength of the ice within the scope of the calculation parameters, which proved the validity and the feasibility of the method, and finally the suitable excitation displacement is determined. Following studies show that, as far as possible, it is necessary to reduce the incentive displacement and also to select the appropriate constraint length in order to avoid the line jumping that may be caused by large span ice shedding.

  19. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  20. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  1. To Solution of Classical Problem Pertaining to Magnetic Interference of Overhead Power Transmission Line on Extended Conducting Communications

    Directory of Open Access Journals (Sweden)

    V. I. Glushko

    2013-01-01

    Full Text Available The paper considers a problem pertaining to magnetic interference of overhead power transmission lines and high-voltage bus bars of electrical installations on extended conducting communications and secondary circuits of relay protection and automation. A simplified task solution has been obtained on the basis of the Carson integral approximation.

  2. Balancing uncertainty of context in ERP project estimation: an approach and a case study

    NARCIS (Netherlands)

    Daneva, Maia

    2010-01-01

    The increasing demand for Enterprise Resource Planning (ERP) solutions as well as the high rates of troubled ERP implementations and outright cancellations calls for developing effort estimation practices to systematically deal with uncertainties in ERP projects. This paper describes an approach -

  3. Single-phase AutoReClosure ARC failure on 400 kV combinedcable/overhead line with permanently connected shunt reactor

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Søgaard, Kim

    2008-01-01

    consisting of overhead lines, crossbonded cable sections and shunt reactor has been created in PSCAD/EMTDC and verified against measurements with good results. Main focus has been put on the likelihood of having a successful single-phase autoreclosure ARC in such a combined cable/OHL line....

  4. Single-phase AutoReClosure ARC failure on 400 kV combinedcable/overhead line with permanently connected shunt reactor

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Søgaard, Kim

    2008-01-01

    400 kV power system and initiated by Danish TSO Energinet.dk after having measured the voltage of the cable/overhead line after disconnection. A particular decaying dynamic phase voltage containing voltages higher than the voltage before disconnection appeared. A simulation model for the entire system...

  5. On low-resistance neutral earthing mode in 20 kV overhead and cable networks

    Directory of Open Access Journals (Sweden)

    Mayorov Andrey

    2017-01-01

    Full Text Available The problems of justification and selection of the required single-phase short-circuit current values in cable and overhead networks of 20 kV with low-resistance neutral earthing are considered. It is shown that the desired values of the short-circuit current can be determined on the basis of harmonization of conflicting influencing factors: reliability of the relay protection and automation devices and required resistances of the earthing devices of electrical installations, including personnel safety. In this case, the main influencing factor is the electrical network structure and parameters

  6. LLVM Infrastructure and Tools Project Summary

    Energy Technology Data Exchange (ETDEWEB)

    McCormick, Patrick Sean [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-06

    This project works with the open source LLVM Compiler Infrastructure (http://llvm.org) to provide tools and capabilities that address needs and challenges faced by ECP community (applications, libraries, and other components of the software stack). Our focus is on providing a more productive development environment that enables (i) improved compilation times and code generation for parallelism, (ii) additional features/capabilities within the design and implementations of LLVM components for improved platform/performance portability and (iii) improved aspects related to composition of the underlying implementation details of the programming environment, capturing resource utilization, overheads, etc. -- including runtime systems that are often not easily addressed by application and library developers.

  7. Joint-operation in water resources project in Indonesia: Integrated or non-integrated

    Science.gov (United States)

    Ophiyandri, Taufika; Istijono, Bambang; Hidayat, Benny

    2017-11-01

    The construction of large water resources infrastructure project often involved a joint-operation (JO) project between two or more construction companies. The form of JO can be grouped into two categories - an integrated type and a non-integrated type. This paper investigates the reason of forming a JO project made by companies. The specific advantages and problems of JO project is also analysed in this paper. In order to achieve the objectives, three water resources infrastructure projects were selected as case studies. Data was gathered by conducting 11 semi-structured interviews to project owners, contractor managers, and project staffs. Data was analysed by means of content analysis. It was found that the most fundamental factor to form a JO is to win a competition or tender. An integrated model is in favour because it can reduce overhead costs and has a simple management system, while a non-integrated model is selected because it can avoid a sleeping partner and make contractor more responsible for their own job.

  8. Estimation of the Net Present Value of the Investment Project in the Situation of Fuzzy Initial Data

    Directory of Open Access Journals (Sweden)

    Kotsyuba Oleksiy S.

    2017-03-01

    Full Text Available The article investigates the problem of estimating the net present value of the investment project using a methodology based on the theory of fuzzy sets in the situation when the initial data are described by fuzzy estimates. In the general case the fuzzy-multiple estimation of the specified indicator at a discrete-interval representation of the initial parameters is reduced to a set of homogeneous optimization problems. Often, depending on the characteristics of fuzzy estimates of cash flows of the investment project under consideration, the solutions to these problems can be found directly on the basis of relevant analytical expressions, while other problems require using special optimization methods. In the work there made an attempt to develop the analytical component of the fuzzy-multiple modeling of the net present value indicator. First, we examined the general search and optimization approach, which allows providing a predetermined degree of accuracy, as well as the method for approximate determination of the fuzzy estimate of the net present value on the basis of analytical relationships developed by Сhui-Yu Chiu and Chan S. Park. After that, the situation was analyzed, and the corresponding calculation model was proposed, when fuzzy estimates of the cash flows of the investment project can be interpreted from the perspective of the concept of the money-generating operation formulated by O. B. Lozhkin. Among other things, it allowed to develop a general scheme for determining the fuzzy estimate of the net present value, supplementing it with the situation of this concept. As the main direction of the further development of the problems discussed in the publication there determined the formation of a holistic methodology for evaluating the effectiveness of real investments, which would cover different in their nature and structural characteristics types of uncertainty from unified theoretical positions.

  9. Anthropogenic Heat Flux Estimation from Space: Results of the second phase of the URBANFLUXES Project

    Science.gov (United States)

    Chrysoulakis, Nektarios; Marconcini, Mattia; Gastellu-Etchegorry, Jean-Philippe; Grimmond, Sue; Feigenwinter, Christian; Lindberg, Fredrik; Del Frate, Fabio; Klostermann, Judith; Mitraka, Zina; Esch, Thomas; Landier, Lucas; Gabey, Andy; Parlow, Eberhard; Olofson, Frans

    2017-04-01

    The H2020-Space project URBANFLUXES (URBan ANthrpogenic heat FLUX from Earth observation Satellites) investigates the potential of Copernicus Sentinels to retrieve anthropogenic heat flux, as a key component of the Urban Energy Budget (UEB). URBANFLUXES advances the current knowledge of the impacts of UEB fluxes on urban heat island and consequently on energy consumption in cities. In URBANFLUXES, the anthropogenic heat flux is estimated as a residual of UEB. Therefore, the rest UEB components, namely, the net all-wave radiation, the net change in heat storage and the turbulent sensible and latent heat fluxes are independently estimated from Earth Observation (EO), whereas the advection term is included in the error of the anthropogenic heat flux estimation from the UEB closure. The Discrete Anisotropic Radiative Transfer (DART) model is employed to improve the estimation of the net all-wave radiation balance, whereas the Element Surface Temperature Method (ESTM), adjusted to satellite observations is used to improve the estimation the estimation of the net change in heat storage. Furthermore the estimation of the turbulent sensible and latent heat fluxes is based on the Aerodynamic Resistance Method (ARM). Based on these outcomes, QF is estimated by regressing the sum of the turbulent heat fluxes versus the available energy. In-situ flux measurements are used to evaluate URBANFLUXES outcomes, whereas uncertainties are specified and analyzed. URBANFLUXES is expected to prepare the ground for further innovative exploitation of EO in scientific activities (climate variability studies at local and regional scales) and future and emerging applications (sustainable urban planning, mitigation technologies) to benefit climate change mitigation/adaptation. This study presents the results of the second phase of the project and detailed information on URBANFLUXES is available at: http://urbanfluxes.eu

  10. Interval Analysis Approach to Prototype the Robust Control of the Laboratory Overhead Crane

    Science.gov (United States)

    Smoczek, J.; Szpytko, J.; Hyla, P.

    2014-07-01

    The paper describes the software-hardware equipment and control-measurement solutions elaborated to prototype the laboratory scaled overhead crane control system. The novelty approach to crane dynamic system modelling and fuzzy robust control scheme design is presented. The iterative procedure for designing a fuzzy scheduling control scheme is developed based on the interval analysis of discrete-time closed-loop system characteristic polynomial coefficients in the presence of rope length and mass of a payload variation to select the minimum set of operating points corresponding to the midpoints of membership functions at which the linear controllers are determined through desired poles assignment. The experimental results obtained on the laboratory stand are presented.

  11. Interval Analysis Approach to Prototype the Robust Control of the Laboratory Overhead Crane

    International Nuclear Information System (INIS)

    Smoczek, J; Szpytko, J; Hyla, P

    2014-01-01

    The paper describes the software-hardware equipment and control-measurement solutions elaborated to prototype the laboratory scaled overhead crane control system. The novelty approach to crane dynamic system modelling and fuzzy robust control scheme design is presented. The iterative procedure for designing a fuzzy scheduling control scheme is developed based on the interval analysis of discrete-time closed-loop system characteristic polynomial coefficients in the presence of rope length and mass of a payload variation to select the minimum set of operating points corresponding to the midpoints of membership functions at which the linear controllers are determined through desired poles assignment. The experimental results obtained on the laboratory stand are presented

  12. Projection display industry market and technology trends

    Science.gov (United States)

    Castellano, Joseph A.; Mentley, David E.

    1995-04-01

    The projection display industry is diverse, embracing a variety of technologies and applications. In recent years, there has been a high level of interest in projection displays, particularly those using LCD panels or light valves because of the difficulty in making large screen, direct view displays. Many developers feel that projection displays will be the wave of the future for large screen HDTV (high-definition television), penetrating the huge existing market for direct view CRT-based televisions. Projection displays can have the images projected onto a screen either from the rear or the front; the main characteristic is their ability to be viewed by more than one person. In addition to large screen home television receivers, there are numerous other uses for projection displays including conference room presentations, video conferences, closed circuit programming, computer-aided design, and military command/control. For any given application, the user can usually choose from several alternative technologies. These include CRT front or rear projectors, LCD front or rear projectors, LCD overhead projector plate monitors, various liquid or solid-state light valve projectors, or laser-addressed systems. The overall worldwide market for projection information displays of all types and for all applications, including home television, will top DOL4.6 billion in 1995 and DOL6.45 billion in 2001.

  13. Error rates and resource overheads of encoded three-qubit gates

    Science.gov (United States)

    Takagi, Ryuji; Yoder, Theodore J.; Chuang, Isaac L.

    2017-10-01

    A non-Clifford gate is required for universal quantum computation, and, typically, this is the most error-prone and resource-intensive logical operation on an error-correcting code. Small, single-qubit rotations are popular choices for this non-Clifford gate, but certain three-qubit gates, such as Toffoli or controlled-controlled-Z (ccz), are equivalent options that are also more suited for implementing some quantum algorithms, for instance, those with coherent classical subroutines. Here, we calculate error rates and resource overheads for implementing logical ccz with pieceable fault tolerance, a nontransversal method for implementing logical gates. We provide a comparison with a nonlocal magic-state scheme on a concatenated code and a local magic-state scheme on the surface code. We find the pieceable fault-tolerance scheme particularly advantaged over magic states on concatenated codes and in certain regimes over magic states on the surface code. Our results suggest that pieceable fault tolerance is a promising candidate for fault tolerance in a near-future quantum computer.

  14. Building support for your wind project : engaging stakeholders : the Dillon Wind Project

    Energy Technology Data Exchange (ETDEWEB)

    Philpott, G. [PPM Energy, Calgary, AB (Canada)

    2007-07-01

    Iberdrola, the world's largest renewable energy company, acquired Scottish Power PLC and its subsidiary PPM Energy in April 2007. Iberdrola operates 6,500 MW of wind energy worldwide. This presentation described PPM Energy's experience with the proposed 45 MW Dillon Wind Project in southern California. The proposed project includes fourty-five 1 MW 327 ft tall Mitsubishi turbines as well as associated facilities such as turbine access roads, underground collector lines, and a collector substation. The wind turbine array occupies 2 per cent of 1500 acres. The vacant rural desert properties surrounding the proposed project area already house 2,700 existing turbines within San Gorgonio Pass, 513 existing turbines within 1/2 of the proposed project, and 2 sites of formerly hosted wind turbines. PPM held an open house for interested residents and stakeholders to learn about the Dillon project and express concerns. The meetings were attended by local wildlife agencies, homeowner groups, the Coachella Valley Economic Partnership and Palm Springs Economic Development Council. The project would help California meet its renewable energy mandates and serve 13,500 homes. It would eliminate 186 million pounds of carbon dioxide, 9.6 million pounds of sulfur dioxide and 5.8 million pounds of nitrous oxides each year. Lessons learned by PPM were: engage in community outreach; emphasize project benefits; build flexibility into design; and address real environmental concerns. In response to public concerns, PPM Energy eliminated 2 turbines from the project. In addition, turbines were shifted away from residences and a scenic highway. All collector lines were placed underground, without any overhead lines. figs.

  15. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  16. Switching overvoltage when disconnecting a combined 400 kVcable/overhead line with permanently connected shunt reactor

    DEFF Research Database (Denmark)

    Bak, Claus Leth; Søgaard, Kim

    2008-01-01

    consisting of overhead lines, crossbonded cable sections and shunt reactor has been created in PSCAD/EMTDC and verified against measurements with good results. Main focus has been put on the generation of switching overvoltages. It is shown that the generation of switching overvoltages is caused by slightly...... different resonant frequencies of the three phases which are reflected between the phases by mutual couplings in such a way that a low-frequent modulation appears in the phase voltages....

  17. Planning of overhead contact lines and simulation of the pantograph running; Oberleitungsplanung und Simulation des Stromabnehmerlaufes

    Energy Technology Data Exchange (ETDEWEB)

    Hofbauer, Gerhard [ALPINE-ENERGIE Oesterreich GmbH, Linz (Austria); Hofbauer, Werner

    2009-07-01

    Using the software FLTG all planning steps for overhead contact lines can be carried out based on the parameters of the contact line type and the line data. Contact line supports and individual spans are presented graphically. The geometric interaction of pantograph and contact line can be simulated taking into account the pantograph type, its sway and the wind action. Thus, the suitability of a line for the interoperability of the transEuropean rail system can be demonstrated. (orig.)

  18. Fast cross-projection algorithm for reconstruction of seeds in prostate brachytherapy

    International Nuclear Information System (INIS)

    Narayanan, Sreeram; Cho, Paul S.; Marks, Robert J. II

    2002-01-01

    A fast method of seed matching and reconstruction in prostrate brachytherapy is proposed. Previous approaches have required all seeds to be matched with all other seeds in other projections. The fast cross-projection algorithm for the reconstruction of seeds (Fast-CARS) allows for matching of a given seed with a subset of seeds in other projections. This subset lies in a proximal region centered about the projection of a line, connecting the seed to its source, onto other projection planes. The proposed technique permits a significant reduction in computational overhead, as measured by the required number of matching tests. The number of multiplications and additions is also vastly reduced at no trade-off in accuracy. Because of its speed, Fast-CARS can be used in applications requiring real-time performance such as intraoperative dosimetry of prostate brachytherapy. Furthermore, the proposed method makes practical the use of a larger number of views as opposed to previous techniques limited to a maximum use of three views

  19. Estimation and Projection of Prevalence of Colorectal Cancer in Iran, 2015-2020.

    Science.gov (United States)

    Vardanjani, Hossein Molavi; Haghdoost, AliAkbar; Bagheri-Lankarani, Kamran; Hadipour, Maryam

    2018-01-01

    Population aging and more prevalent westernized lifestyle would be expected to result in a markedly rising burden of colorectal cancer (CRC) in the future years. The aim of this study is to estimate the limited-time prevalence of CRC in Iran between 2015 and 2020. Aggregated CRC incidence data were extracted from the Iranian national cancer registry (IR.NCR) reports for 2003-2009 and from GLOBOCAN-2012 database for 2012. Incidence trends were analyzed by age groups, genders, histopathologic, and topographic subtypes to estimate annual percentage changes. Incidence was projected for 2020. The prevalence was estimated applying an adopted version of a previously introduced equation to estimate limited-time prevalence based on the incidence and survival data. Monte Carlo sensitivity analyses were applied to estimate 95% uncertainty levels (ULs). In each scenario, incidence, survival, annual percentage changes, and completeness of case ascertainment at IR.NCR were replaced under pre-assumed distributions. Number of estimated within 1, 2-3 and 4-5-year CRC patients in 2015 were 13676 (95% UL: 10051-18807), 20964 (15835-28268), and 14485 (11188-19293), respectively. Estimated 5-year prevalence for 2020 (99463; 75150-134744) was 2.03 times of that for 2015. Highest 5-year prevalence was estimated in ages 55-59 for females and 75 + for males. Adenocarcinoma (41376; 31227 55898) was the most prevalent histologic subtype. The most prevalent tumor location was colon (30822, 23262-41638). A substantial growth in the prevalence of CRC survivors is highly expected for future years in Iran. Establishment of specialized institutes is highly recommended to provide medical and especially social supports for Iranian CRC survivors.

  20. Obstacle negotiation control for a mobile robot suspended on overhead ground wires by optoelectronic sensors

    Science.gov (United States)

    Zheng, Li; Yi, Ruan

    2009-11-01

    Power line inspection and maintenance already benefit from developments in mobile robotics. This paper presents mobile robots capable of crossing obstacles on overhead ground wires. A teleoperated robot realizes inspection and maintenance tasks on power transmission line equipment. The inspection robot is driven by 11 motor with two arms, two wheels and two claws. The inspection robot is designed to realize the function of observation, grasp, walk, rolling, turn, rise, and decline. This paper is oriented toward 100% reliable obstacle detection and identification, and sensor fusion to increase the autonomy level. An embedded computer based on PC/104 bus is chosen as the core of control system. Visible light camera and thermal infrared Camera are both installed in a programmable pan-and-tilt camera (PPTC) unit. High-quality visual feedback rapidly becomes crucial for human-in-the-loop control and effective teleoperation. The communication system between the robot and the ground station is based on Mesh wireless networks by 700 MHz bands. An expert system programmed with Visual C++ is developed to implement the automatic control. Optoelectronic laser sensors and laser range scanner were installed in robot for obstacle-navigation control to grasp the overhead ground wires. A novel prototype with careful considerations on mobility was designed to inspect the 500KV power transmission lines. Results of experiments demonstrate that the robot can be applied to execute the navigation and inspection tasks.

  1. The perceived health risks of indoor radon gas and overhead powerlines: a comparative multilevel approach.

    Science.gov (United States)

    Poortinga, Wouter; Cox, Patrick; Pidgeon, Nick F

    2008-02-01

    Radon and overhead powerlines are two radiation risk cases that have raised varying levels of concern among the general public and experts. Despite both involving radiation-a typically feared and unseen health hazard-individuals' perceptions of the two risk cases may invoke rather different factors. We examined individual and geographic-contextual factors influencing public perceptions of the health risks of indoor radon gas and overhead powerlines in a comparative research design, utilizing a postal questionnaire with 1,528 members of the general public (response rate 28%) and multilevel modeling techniques. This study found that beliefs about the two risk cases mainly differed according to the level of "exposure"-defined here in terms of spatial proximity. We argue that there are two alternative explanations for this pattern of findings: that risk perception itself varies directly with proximity, or that risk is more salient to concerned people in the exposed areas. We also found that while people living in high radon areas are more concerned about the risks of indoor radon gas, they find these risks more acceptable and have more trust in authorities. These results might reflect the positive effects of successive radon campaigns in high radon areas, which may have raised awareness and concern, and at the same time may have helped to increase trust by showing that the government takes the health risks of indoor radon gas seriously, suggesting that genuine risk communication initiatives may have positive impacts on trust in risk management institutions.

  2. Developing milk industry estimates for dose reconstruction projects

    International Nuclear Information System (INIS)

    Beck, D.M.; Darwin, R.F.

    1991-01-01

    One of the most important contributors to radiation doses from hanford during the 1944-1947 period was radioactive iodine. Consumption of milk from cows that ate vegetation contaminated with iodine is likely the dominant pathway of human exposure. To estimate the doses people could have received from this pathway, it is necessary to reconstruct the amount of milk consumed by people living near Hanford, the source of the milk, and the type of feed that the milk cows ate. This task is challenging because the dairy industry has undergone radical changes since the end of World War 2, and records that document the impact of these changes on the study area are scarce. Similar problems are faced by researchers on most dose reconstruction efforts. The purpose of this work is to document and evaluate the methods used on the Hanford Environmental Dose Reconstruction (HEDR) Project to reconstruct the milk industry and to present preliminary results

  3. The QCDOC Project

    International Nuclear Information System (INIS)

    Boyle, P.; Chen, D.; Christ, N.; Clark, M.; Cohen, S.; Cristian, C.; Dong, Z.; Gara, A.; Joo, B.; Jung, C.; Kim, C.; Levkova, L.; Liao, X.; Liu, G.; Li, S.; Lin, H.; Mawhinney, R.; Ohta, S.; Petrov, K.; Wettig, T.; Yamaguchi, A.

    2005-01-01

    The QCDOC project has developed a supercomputer optimised for the needs of Lattice QCD simulations. It provides a very competitive price to sustained performance ratio of around $1 USD per sustained Megaflop/s in combination with outstanding scalability. Thus very large systems delivering over 5 TFlop/s of performance on the evolution of a single lattice is possible. Large prototypes have been built and are functioning correctly. The software environment raises the state of the art in such custom supercomputers. It is based on a lean custom node operating system that eliminates many unnecessary overheads that plague other systems. Despite the custom nature, the operating system implements a standards compliant UNIX-like programming environment easing the porting of software from other systems. The SciDAC QMP interface adds internode communication in a fashion that provides a uniform cross-platform programming environment

  4. The Way of Reducing Current Values in Optical Ground Wires at Asymmetrical Faults on Overhead Transmission Lines

    Directory of Open Access Journals (Sweden)

    Egamnazarov Georgiy

    2016-12-01

    Full Text Available Given the fact that the installing costs of an optical ground wire on overhead lines directly depend on its cross-section, which in turn depends on the level of fault current it should withstand, in order to reduce these current values in the optical ground wire, I suggested performing its isolated descents from the end towers of the line with its transition to an optical cable. The research was carried out on the example of a 500 kV overhead line in the National Electric Power Grid. The Method of Symmetrical Components for calculating asymmetrical fault currents was not used; therefore, calculations were carried out on the base of presenting the line as a multi-wire system for the considered case as a five-wire system (optical ground wire, steel ground wire, and three phase wires. Such approach allows taking into account the initial asymmetry of the line parameters and modeling any kind of asymmetrical faults. The analyses of calculated results were performed. The conclusive evidence that the optical ground wire isolated descents from the end towers of the line give the possibility of reducing the level of maximal fault current distribution values in it and therefore its cross section, is presented.

  5. Switched Two-Level H∞ and Robust Fuzzy Learning Control of an Overhead Crane

    Directory of Open Access Journals (Sweden)

    Kao-Ting Hung

    2013-01-01

    Full Text Available Overhead cranes are typical dynamic systems which can be modeled as a combination of a nominal linear part and a highly nonlinear part. For such kind of systems, we propose a control scheme that deals with each part separately, yet ensures global Lyapunov stability. The former part is readily controllable by the H∞ PDC techniques, and the latter part is compensated by fuzzy mixture of affine constants, leaving the remaining unmodeled dynamics or modeling error under robust learning control using the Nelder-Mead simplex algorithm. Comparison with the adaptive fuzzy control method is given via simulation studies, and the validity of the proposed control scheme is demonstrated by experiments on a prototype crane system.

  6. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  7. Evaluating and Estimating the WCET Criticality Metric

    DEFF Research Database (Denmark)

    Jordan, Alexander

    2014-01-01

    a programmer (or compiler) from targeting optimizations the right way. A possible resort is to use a metric that targets WCET and which can be efficiently computed for all code parts of a program. Similar to dynamic profiling techniques, which execute code with input that is typically expected...... for the application, based on WCET analysis we can indicate how critical a code fragment is, in relation to the worst-case bound. Computing such a metric on top of static analysis, incurs a certain overhead though, which increases with the complexity of the underlying WCET analysis. We present our approach...... to estimate the Criticality metric, by relaxing the precision of WCET analysis. Through this, we can reduce analysis time by orders of magnitude, while only introducing minor error. To evaluate our estimation approach and share our garnered experience using the metric, we evaluate real-time programs, which...

  8. Improvement of image quality using interpolated projection data estimation method in SPECT

    International Nuclear Information System (INIS)

    Takaki, Akihiro; Soma, Tsutomu; Murase, Kenya; Kojima, Akihiro; Asao, Kimie; Kamada, Shinya; Matsumoto, Masanori

    2009-01-01

    General data acquisition for single photon emission computed tomography (SPECT) is performed in 90 or 60 directions, with a coarse pitch of approximately 4-6 deg for a rotation of 360 deg or 180 deg, using a gamma camera. No data between adjacent projections will be sampled under these circumstances. The aim of the study was to develop a method to improve SPECT image quality by generating lacking projection data through interpolation of data obtained with a coarse pitch such as 6 deg. The projection data set at each individual degree in 360 directions was generated by a weighted average interpolation method from the projection data acquired with a coarse sampling angle (interpolated projection data estimation processing method, IPDE method). The IPDE method was applied to the numerical digital phantom data, actual phantom data and clinical brain data with Tc-99m ethyle cysteinate dimer (ECD). All SPECT images were reconstructed by the filtered back-projection method and compared with the original SPECT images. The results confirmed that streak artifacts decreased by apparently increasing a sampling number in SPECT after interpolation and also improved signal-to-noise (S/N) ratio of the root mean square uncertainty value. Furthermore, the normalized mean square error values, compared with standard images, had similar ones after interpolation. Moreover, the contrast and concentration ratios increased their effects after interpolation. These results indicate that effective improvement of image quality can be expected with interpolation. Thus, image quality and the ability to depict images can be improved while maintaining the present acquisition time and image quality. In addition, this can be achieved more effectively than at present even if the acquisition time is reduced. (author)

  9. A novel mechanical design of broken rope protection device for enhancing the safety performances of overhead manned equipment in coal mine

    Directory of Open Access Journals (Sweden)

    Xiaoguang Zhang

    2015-08-01

    Full Text Available A novel mechanical design of the broken rope protection device is proposed to enhance the safety performances of the overhead manned equipment. According to the operating characteristics and functional requirements of the overhead manned equipment, a three-dimensional mechanical model of the broken rope protection device was redesigned. Based on the known parameters of the mechanical model, the stress and strength of the main components are readjusted using the statics characteristics of finite element analysis. To ensure the reliability of the control system of the broken rope protection device, the process of people’s falling, the response performance of the tension sensor, and the signal extraction of the broken rope are analyzed under different loading and unloading speeds. The working principle of the broken rope protection device is expounded in detail. The experimental results showed that better effect is obtained by the new broken rope protection device, which is characterized by good durability, low investment, and high reliability.

  10. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  11. Visual impact of overhead power transmission lines and dielectric and corona effects constraints on insulation coordination

    International Nuclear Information System (INIS)

    Deponti, F.; Fini, G.P.; Porrino, A.; Rosa, F.

    1992-06-01

    In assessing overhead power transmission line design and planning criteria for the optimization of visual impact, safety and the reduction of electro magnetic disturbance effects, this paper reviews the research findings of ENEL, the Italian Electricity Board. The on-going research activities involve theoretical calculations and laboratory performance tests to determine the best compact configurations for 380 kV lines. The parameters under examination include: insulator spacing, sizing and salt fog resistivity; allowable overvoltages; maximum line length; behaviour in lightning conditions; radio and acoustics disturbances

  12. Group of Hexagonal Search Patterns for Motion Estimation and Object Tracking

    International Nuclear Information System (INIS)

    Elazm, A.A.; Mahmoud, I.I; Hashima, S.M.

    2010-01-01

    This paper presents a group of fast block matching algorithms based on the hexagon pattern search .A new predicted one point hexagon (POPHEX) algorithm is proposed and compared with other well known algorithms. The comparison of these algorithms and our proposed one is performed for both motion estimation and object tracking. Test video sequences are used to demonstrate the behavior of studied algorithms. All algorithms are implemented in MATLAB environment .Experimental results showed that the proposed algorithm posses less number of search points however its computational overhead is little increased due to prediction procedure.

  13. A cost-benefit analysis of peer coaching for overhead lift use in the long-term care sector in Canada.

    Science.gov (United States)

    Tompa, Emile; Dolinschi, Roman; Alamgir, Hasanat; Sarnocinska-Hart, Anna; Guzman, Jaime

    2016-05-01

    To evaluate whether a peer-coaching programme for patient lift use in British Columbia, Canada, was effective and cost-beneficial. We used monthly panel data from 15 long-term care facilities from 2004 to 2011 to estimate the number of patient-handling injuries averted by the peer-coaching programme using a generalised estimating equation model. Facilities that had not yet introduced the programme served as concurrent controls. Accepted lost-time claim counts related to patient handling were the outcome of interest with a denominator of full-time equivalents of nursing staff. A cost-benefit approach was used to estimate the net monetary gains at the system level. The coaching programme was found to be associated with a reduction in the injury rate of 34% during the programme and 56% after the programme concluded with an estimated 62 lost-time injury claims averted. 2 other factors were associated with changes in injury rates: larger facilities had a lower injury rate, and the more care hours per bed the lower the injury rate. We calculated monetary benefits to the system of $748 431 and costs of $894 000 (both in 2006 Canadian dollars) with a benefit-to-cost ratio of 0.84. The benefit-to-cost ratio was -0.05 in the worst case scenario and 2.31 in the best case scenario. The largest cost item was peer coaches' time. A simulation of the programme continuing for 5 years with the same coaching intensity would result in a benefit-to-cost ratio of 0.63. A peer-coaching programme to increase effective use of overhead lifts prevented additional patient-handling injuries but added modest incremental cost to the system. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  14. Overhead Bryant's Traction Does Not Improve the Success of Closed Reduction or Limit AVN in Developmental Dysplasia of the Hip.

    Science.gov (United States)

    Sucato, Daniel J; De La Rocha, Adriana; Lau, Karlee; Ramo, Brandon A

    2017-03-01

    Preoperative Bryant's overhead traction before closed reduction (CR) in developmental dysplasia of the hip (DDH) remains controversial and its success in increasing CR rates and reducing avascular necrosis (AVN) rates has not been specifically reported in a large cohort. IRB-approved retrospective study of patients (below 3 y)who were treated with attempted CR for idiopathic DDH from 1980 to 2009. Successful CR was defined as a hip that remained reduced and did not require repeat CR or open reduction. Patients were grouped by age, hip instability [Ortolani positive (reducible) vs. fixed dislocation], and Tonnis classification and rates of successful CR were compared between groups with PAVN between the traction (18%) and no-traction (8%) groups for all patients (P=0.15). In this retrospective series, preoperative Bryant's traction does not improve the rate of a successful CR for patients with DDH and has no protective effect on the development of AVN of the femoral head. These results suggest that Bryant's overhead traction may not be warranted for patients below 3 years of age with DDH. Level III.

  15. Evolution and experience with the ATLAS Simulation at Point1 Project

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00389536; The ATLAS collaboration; Brasolin, Franco; Kouba, Tomas; Schovancova, Jaroslava; Fazio, Daniel; Di Girolamo, Alessandro; Scannicchio, Diana; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander; Lee, Christopher

    2017-01-01

    The Simulation at Point1 project is successfully running standard ATLAS simulation jobs on the TDAQ HLT resources. The pool of available resources changes dynamically, therefore we need to be very effective in exploiting the available computing cycles. We present our experience with using the Event Service that provides the event-level granularity of computations. We show the design decisions and overhead time related to the usage of the Event Service. The improved utilization of the resources is also presented with the recent development in monitoring, automatic alerting, deployment and GUI.

  16. Evolution and experience with the ATLAS simulation at Point1 project

    CERN Document Server

    Ballestrero, Sergio; The ATLAS collaboration; Fazio, Daniel; Di Girolamo, Alessandro; Kouba, Tomas; Lee, Christopher; Scannicchio, Diana; Schovancova, Jaroslava; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander

    2016-01-01

    The Simulation at Point1 project is successfully running traditional ATLAS simulation jobs on the TDAQ HLT resources. The pool of available resources changes dynamically, therefore we need to be very effective in exploiting the available computing cycles. We will present our experience with using the Event Service that provides the event-level granularity of computations. We will show the design decisions and overhead time related to the usage of the Event Service. The improved utilization of the resources will also be presented with the recent development in monitoring, automatic alerting, deployment and GUI.

  17. Reliable Multihop Broadcast Protocol with a Low-Overhead Link Quality Assessment for ITS Based on VANETs in Highway Scenarios

    Directory of Open Access Journals (Sweden)

    Alejandro Galaviz-Mosqueda

    2014-01-01

    Full Text Available Vehicular ad hoc networks (VANETs have been identified as a key technology to enable intelligent transport systems (ITS, which are aimed to radically improve the safety, comfort, and greenness of the vehicles in the road. However, in order to fully exploit VANETs potential, several issues must be addressed. Because of the high dynamic of VANETs and the impairments in the wireless channel, one key issue arising when working with VANETs is the multihop dissemination of broadcast packets for safety and infotainment applications. In this paper a reliable low-overhead multihop broadcast (RLMB protocol is proposed to address the well-known broadcast storm problem. The proposed RLMB takes advantage of the hello messages exchanged between the vehicles and it processes such information to intelligently select a relay set and reduce the redundant broadcast. Additionally, to reduce the hello messages rate dependency, RLMB uses a point-to-zone link evaluation approach. RLMB performance is compared with one of the leading multihop broadcast protocols existing to date. Performance metrics show that our RLMB solution outperforms the leading protocol in terms of important metrics such as packet dissemination ratio, overhead, and delay.

  18. Simplified formulae for the estimation of the positive-sequence resistance and reactance of three-phase cables for different frequencies

    DEFF Research Database (Denmark)

    Silva, Filipe Miguel Faria da

    2015-01-01

    The installation of HVAC underground cables became more common in recent years, a trend expected to continue in the future. Underground cables are more complex than overhead lines and the calculation of their resistance and reactance can be challenging and time consuming for frequencies that are ......The installation of HVAC underground cables became more common in recent years, a trend expected to continue in the future. Underground cables are more complex than overhead lines and the calculation of their resistance and reactance can be challenging and time consuming for frequencies...... that are not power frequency. Software packages capable of performing exact calculations of these two parameters exist, but simple equations able to estimate the reactance and resistance of an underground cable for the frequencies associated to a transient or a resonance phenomenon would be helpful. This paper...

  19. Inexpensive, rapid prototyping of microfluidic devices using overhead transparencies and a laser print, cut and laminate fabrication method.

    Science.gov (United States)

    Thompson, Brandon L; Ouyang, Yiwen; Duarte, Gabriela R M; Carrilho, Emanuel; Krauss, Shannon T; Landers, James P

    2015-06-01

    We describe a technique for fabricating microfluidic devices with complex multilayer architectures using a laser printer, a CO2 laser cutter, an office laminator and common overhead transparencies as a printable substrate via a laser print, cut and laminate (PCL) methodology. The printer toner serves three functions: (i) it defines the microfluidic architecture, which is printed on the overhead transparencies; (ii) it acts as the adhesive agent for the bonding of multiple transparency layers; and (iii) it provides, in its unmodified state, printable, hydrophobic 'valves' for fluidic flow control. By using common graphics software, e.g., CorelDRAW or AutoCAD, the protocol produces microfluidic devices with a design-to-device time of ∼40 min. Devices of any shape can be generated for an array of multistep assays, with colorimetric detection of molecular species ranging from small molecules to proteins. Channels with varying depths can be formed using multiple transparency layers in which a CO2 laser is used to remove the polyester from the channel sections of the internal layers. The simplicity of the protocol, availability of the equipment and substrate and cost-effective nature of the process make microfluidic devices available to those who might benefit most from expedited, microscale chemistry.

  20. Fast Rate Estimation for RDO Mode Decision in HEVC

    Directory of Open Access Journals (Sweden)

    Maxim P. Sharabayko

    2014-12-01

    Full Text Available The latter-day H.265/HEVC video compression standard is able to provide two-times higher compression efficiency compared to the current industrial standard, H.264/AVC. However, coding complexity also increased. The main bottleneck of the compression process is the rate-distortion optimization (RDO stage, as it involves numerous sequential syntax-based binary arithmetic coding (SBAC loops. In this paper, we present an entropy-based RDO estimation technique for H.265/HEVC compression, instead of the common approach based on the SBAC. Our RDO implementation reduces RDO complexity, providing an average bit rate overhead of 1.54%. At the same time, elimination of the SBAC from the RDO estimation reduces block interdependencies, thus providing an opportunity for the development of the compression system with parallel processing of multiple blocks of a video frame.

  1. Stabilization and Riesz basis property for an overhead crane model with feedback in velocity and rotating velocity

    Directory of Open Access Journals (Sweden)

    Toure K. Augustin

    2014-06-01

    Full Text Available This paper studies a variant of an overhead crane model's problem, with a control force in velocity and rotating velocity on the platform. We obtain under certain conditions the well-posedness and the strong stabilization of the closed-loop system. We then analyze the spectrum of the system. Using a method due to Shkalikov, we prove the existence of a sequence of generalized eigenvectors of the system, which forms a Riesz basis for the state energy Hilbert space.

  2. Constructing Predictive Estimates for Worker Exposure to Radioactivity During Decommissioning: Analysis of Completed Decommissioning Projects - Master Thesis

    Energy Technology Data Exchange (ETDEWEB)

    Dettmers, Dana Lee; Eide, Steven Arvid

    2002-10-01

    An analysis of completed decommissioning projects is used to construct predictive estimates for worker exposure to radioactivity during decommissioning activities. The preferred organizational method for the completed decommissioning project data is to divide the data by type of facility, whether decommissioning was performed on part of the facility or the complete facility, and the level of radiation within the facility prior to decommissioning (low, medium, or high). Additional data analysis shows that there is not a downward trend in worker exposure data over time. Also, the use of a standard estimate for worker exposure to radioactivity may be a best estimate for low complete storage, high partial storage, and medium reactor facilities; a conservative estimate for some low level of facility radiation facilities (reactor complete, research complete, pits/ponds, other), medium partial process facilities, and high complete research facilities; and an underestimate for the remaining facilities. Limited data are available to compare different decommissioning alternatives, so the available data are reported and no conclusions can been drawn. It is recommended that all DOE sites and the NRC use a similar method to document worker hours, worker exposure to radiation (person-rem), and standard industrial accidents, injuries, and deaths for all completed decommissioning activities.

  3. Models of Charity Donations and Project Funding in Social Networks

    Science.gov (United States)

    Wojciechowski, Adam

    One of the key fundaments of building a society is common interest or shared aims of the group members. This research work is a try to analyze web-based services oriented towards money collection for various social and charity projects. The phenomenon of social founding is worth a closer look at because its success strongly depends on the ability to build an ad-hoc or persistent groups of people sharing their believes and willing to support external institutions or individuals. The paper presents a review of money collection sites, various models of donation and money collection process as well as ways how the projects' results are reported to their founders. There is also a proposal of money collection service, where donators are not charged until total declared help overheads required resources to complete the project. The risk of missing real donations for declared payments, after the collection is closed, can be assessed and minimized by building a social network.

  4. Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

    Science.gov (United States)

    Butts, Glenn

    2007-01-01

    Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

  5. Estimation of Externalities for Juragua Nuclear Project

    International Nuclear Information System (INIS)

    Mora, H. R.; Carbonell, L. T.

    2002-01-01

    Estimation of externalities allows taking into account environmental impacts due to any activity in total costs calculation. In the present work, the external costs of electricity generation from nuclear energy were calculated considering three scenarios: normal operation (routine releases), accident situation and solid waste disposal. A comparison between these results and those obtained for electricity generation from fossil fuels was made. IAEA proposals of Simplified methodologies were used for externality calculations. The Juragua project was selected as a study case; it is based in two energetic blocks both PWR, VVER 440/318 type with a plant capacity of 417 MWe each. Four impact ways were considered for all scenarios: (1) Inhalation of radionuclides in the air, (2) External irradiation from radionuclides immersed in clouds, (3) External irradiation from deposited radionuclides and (4) Ingestion of radionuclides in agricultural products. Besides, two impact categories (local and regional) for all scenarios were considered. The total cost of externalities was 0.01425 c/kWh, value smaller than the one obtained for electricity generation from fossil fuel (0.256 c/kWh). For the normal operation scenario, the external cost calculated was 0.00112 c/kWh, for accident situation 0.01103 c/kWh, and for the solid wastes management scenario 0.0021 c/kWh. The high value obtained for solid waste disposal scenario is due to repository placement features. (author)

  6. Estimation and Projection of Prevalence of Colorectal Cancer in Iran, 2015–2020

    Directory of Open Access Journals (Sweden)

    Hossein Molavi Vardanjani

    2018-01-01

    Full Text Available Background: Population aging and more prevalent westernized lifestyle would be expected to result in a markedly rising burden of colorectal cancer (CRC in the future years. The aim of this study is to estimate the limited-time prevalence of CRC in Iran between 2015 and 2020. Materials and Methods: Aggregated CRC incidence data were extracted from the Iranian national cancer registry (IR.NCR reports for 2003–2009 and from GLOBOCAN-2012 database for 2012. Incidence trends were analyzed by age groups, genders, histopathologic, and topographic subtypes to estimate annual percentage changes. Incidence was projected for 2020. The prevalence was estimated applying an adopted version of a previously introduced equation to estimate limited–time prevalence based on the incidence and survival data. Monte Carlo sensitivity analyses were applied to estimate 95% uncertainty levels (ULs. In each scenario, incidence, survival, annual percentage changes, and completeness of case ascertainment at IR.NCR were replaced under pre-assumed distributions. Results: Number of estimated within 1, 2-3 and 4-5-year CRC patients in 2015 were 13676 (95% UL: 10051–18807, 20964 (15835–28268, and 14485 (11188–19293, respectively. Estimated 5-year prevalence for 2020 (99463; 75150–134744 was 2.03 times of that for 2015. Highest 5-year prevalence was estimated in ages 55–59 for females and 75 + for males. Adenocarcinoma (41376; 31227 55898 was the most prevalent histologic subtype. The most prevalent tumor location was colon (30822, 23262–41638. Conclusion: A substantial growth in the prevalence of CRC survivors is highly expected for future years in Iran. Establishment of specialized institutes is highly recommended to provide medical and especially social supports for Iranian CRC survivors.

  7. Estimation and Projection of Prevalence of Colorectal Cancer in Iran, 2015–2020

    Science.gov (United States)

    Vardanjani, Hossein Molavi; Haghdoost, AliAkbar; Bagheri-Lankarani, Kamran; Hadipour, Maryam

    2018-01-01

    Background: Population aging and more prevalent westernized lifestyle would be expected to result in a markedly rising burden of colorectal cancer (CRC) in the future years. The aim of this study is to estimate the limited-time prevalence of CRC in Iran between 2015 and 2020. Materials and Methods: Aggregated CRC incidence data were extracted from the Iranian national cancer registry (IR.NCR) reports for 2003–2009 and from GLOBOCAN-2012 database for 2012. Incidence trends were analyzed by age groups, genders, histopathologic, and topographic subtypes to estimate annual percentage changes. Incidence was projected for 2020. The prevalence was estimated applying an adopted version of a previously introduced equation to estimate limited–time prevalence based on the incidence and survival data. Monte Carlo sensitivity analyses were applied to estimate 95% uncertainty levels (ULs). In each scenario, incidence, survival, annual percentage changes, and completeness of case ascertainment at IR.NCR were replaced under pre-assumed distributions. Results: Number of estimated within 1, 2-3 and 4-5-year CRC patients in 2015 were 13676 (95% UL: 10051–18807), 20964 (15835–28268), and 14485 (11188–19293), respectively. Estimated 5-year prevalence for 2020 (99463; 75150–134744) was 2.03 times of that for 2015. Highest 5-year prevalence was estimated in ages 55–59 for females and 75 + for males. Adenocarcinoma (41376; 31227 55898) was the most prevalent histologic subtype. The most prevalent tumor location was colon (30822, 23262–41638). Conclusion: A substantial growth in the prevalence of CRC survivors is highly expected for future years in Iran. Establishment of specialized institutes is highly recommended to provide medical and especially social supports for Iranian CRC survivors. PMID:29456991

  8. Superconducting solenoids for suspension of high-speed overhead transportation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Omel' yanenko, V I [Kharkov Polytechnical Inst., USSR; Bocharov, V I; Dolgosheev, E A; Usichenko, Y G

    1977-08-01

    A superconducting solenoid is the most important component of a suspension for overhead transportation facilities operating on the repulsion principle. Its design is aimed at producing an adequate magnetic field within the active zone, to ensure a high ratio of lifting force to braking force, the necessary speed dependence of both forces, and a high ratio of lifting force to solenoid mass. The design must also be both technologically and economically feasible. For safety considerations, the magnetic field intensity inside the passenger compartment must be minimum. A survey of existing designs indicates a preference for race track solenoids of quasi-rectangular shape. While all designers already agree on a coil width within 0.25 to 0.6 m, the optimum coil length has not yet been established. Intrinsic stabilization of superconductors by stranding and twisting has pushed the maximum allowable current density to 200 A/mm/sup 2/ and the energy storing capacity of magnets to 100 kJ, a capacity of 1 MJ being within reach. The recommended coil dimensions for laboratory models are 1 m length and 0.3 m width, to carry magnetizing currents up to 0.3 MA.

  9. Using Copulas in the Estimation of the Economic Project Value in the Mining Industry, Including Geological Variability

    Science.gov (United States)

    Krysa, Zbigniew; Pactwa, Katarzyna; Wozniak, Justyna; Dudek, Michal

    2017-12-01

    Geological variability is one of the main factors that has an influence on the viability of mining investment projects and on the technical risk of geology projects. In the current scenario, analyses of economic viability of new extraction fields have been performed for the KGHM Polska Miedź S.A. underground copper mine at Fore Sudetic Monocline with the assumption of constant averaged content of useful elements. Research presented in this article is aimed at verifying the value of production from copper and silver ore for the same economic background with the use of variable cash flows resulting from the local variability of useful elements. Furthermore, the ore economic model is investigated for a significant difference in model value estimated with the use of linear correlation between useful elements content and the height of mine face, and the approach in which model parameters correlation is based upon the copula best matched information capacity criterion. The use of copula allows the simulation to take into account the multi variable dependencies at the same time, thereby giving a better reflection of the dependency structure, which linear correlation does not take into account. Calculation results of the economic model used for deposit value estimation indicate that the correlation between copper and silver estimated with the use of copula generates higher variation of possible project value, as compared to modelling correlation based upon linear correlation. Average deposit value remains unchanged.

  10. WE-AB-303-09: Rapid Projection Computations for On-Board Digital Tomosynthesis in Radiation Therapy

    Energy Technology Data Exchange (ETDEWEB)

    Iliopoulos, AS; Sun, X [Duke University, Durham, NC (United States); Pitsianis, N [Aristotle University of Thessaloniki (Greece); Duke University, Durham, NC (United States); Yin, FF; Ren, L [Duke University Medical Center, Durham, NC (United States)

    2015-06-15

    Purpose: To facilitate fast and accurate iterative volumetric image reconstruction from limited-angle on-board projections. Methods: Intrafraction motion hinders the clinical applicability of modern radiotherapy techniques, such as lung stereotactic body radiation therapy (SBRT). The LIVE system may impact clinical practice by recovering volumetric information via Digital Tomosynthesis (DTS), thus entailing low time and radiation dose for image acquisition during treatment. The DTS is estimated as a deformation of prior CT via iterative registration with on-board images; this shifts the challenge to the computational domain, owing largely to repeated projection computations across iterations. We address this issue by composing efficient digital projection operators from their constituent parts. This allows us to separate the static (projection geometry) and dynamic (volume/image data) parts of projection operations by means of pre-computations, enabling fast on-board processing, while also relaxing constraints on underlying numerical models (e.g. regridding interpolation kernels). Further decoupling the projectors into simpler ones ensures the incurred memory overhead remains low, within the capacity of a single GPU. These operators depend only on the treatment plan and may be reused across iterations and patients. The dynamic processing load is kept to a minimum and maps well to the GPU computational model. Results: We have integrated efficient, pre-computable modules for volumetric ray-casting and FDK-based back-projection with the LIVE processing pipeline. Our results show a 60x acceleration of the DTS computations, compared to the previous version, using a single GPU; presently, reconstruction is attained within a couple of minutes. The present implementation allows for significant flexibility in terms of the numerical and operational projection model; we are investigating the benefit of further optimizations and accurate digital projection sub

  11. WE-AB-303-09: Rapid Projection Computations for On-Board Digital Tomosynthesis in Radiation Therapy

    International Nuclear Information System (INIS)

    Iliopoulos, AS; Sun, X; Pitsianis, N; Yin, FF; Ren, L

    2015-01-01

    Purpose: To facilitate fast and accurate iterative volumetric image reconstruction from limited-angle on-board projections. Methods: Intrafraction motion hinders the clinical applicability of modern radiotherapy techniques, such as lung stereotactic body radiation therapy (SBRT). The LIVE system may impact clinical practice by recovering volumetric information via Digital Tomosynthesis (DTS), thus entailing low time and radiation dose for image acquisition during treatment. The DTS is estimated as a deformation of prior CT via iterative registration with on-board images; this shifts the challenge to the computational domain, owing largely to repeated projection computations across iterations. We address this issue by composing efficient digital projection operators from their constituent parts. This allows us to separate the static (projection geometry) and dynamic (volume/image data) parts of projection operations by means of pre-computations, enabling fast on-board processing, while also relaxing constraints on underlying numerical models (e.g. regridding interpolation kernels). Further decoupling the projectors into simpler ones ensures the incurred memory overhead remains low, within the capacity of a single GPU. These operators depend only on the treatment plan and may be reused across iterations and patients. The dynamic processing load is kept to a minimum and maps well to the GPU computational model. Results: We have integrated efficient, pre-computable modules for volumetric ray-casting and FDK-based back-projection with the LIVE processing pipeline. Our results show a 60x acceleration of the DTS computations, compared to the previous version, using a single GPU; presently, reconstruction is attained within a couple of minutes. The present implementation allows for significant flexibility in terms of the numerical and operational projection model; we are investigating the benefit of further optimizations and accurate digital projection sub

  12. Customized overhead cranes for installation of India's largest 3.6m optical telescope at Devasthal, Nainital, India

    Science.gov (United States)

    Bangia, Tarun; Yadava, Shobhit; Kumar, Brijesh; Ghanti, A. S.; Hardikar, P. M.

    2016-07-01

    India's largest 3.6 m aperture optical telescope facility has been recently established at Devasthal site by Aryabhatta Research Institute of Observation Sciences (ARIES), an autonomous Institute under Department of Science and Technology, Government of India. The telescope is equipped with active optics and it is designed to be used for seeinglimited observations at visible and near-infrared wavelengths. A steel building with rotating cylindrical steel Dome was erected to house 3.6m telescope and its accessories at hilltop of Devasthal site. Customized cranes were essentially required inside the building as there were space constraints around the telescope building for operating big external heavy duty cranes from outside, transportation constraints in route for bringing heavy weight cranes, altitude of observatory, and sharp bends etc. to site. To meet the challenge of telescope installation from inside the telescope building by lifting components through its hatch, two Single Girder cranes and two Under Slung cranes of 10 MT capacity each were specifically designed and developed. All the four overhead cranes were custom built to achieve the goal of handling telescope mirror and its various components during installation and assembly. Overhead cranes were installed in limited available space inside the building and tested as per IS 3177. Cranes were equipped with many features like VVVFD compatibility, provision for tandem operation, digital load display, anti-collision mechanism, electrical interlocks, radio remote, low hook height and compact carriage etc. for telescope integration at site.

  13. Central uplift of custom immobilization radiotherapy patients with lower limb overhead sagittal laser affected without mobile

    International Nuclear Information System (INIS)

    Velazquez Miranda, S.; Delgado Gil, M. M.; Ortiz Seidel, M.

    2011-01-01

    If you have a laser moving overhead sagittal or the location of tumors in the lower extremities is laborious, as to reference properly in the CT, is necessary before tattooing in the treatment table using their ability to relate the lateral midline with tattoos on the limb. For anatomical forms often happens that lasers are not displayed on the areas of our interest. The problem can be overcome if between the legs raise the bag or custom immobilizer above the height of the patient's abdomen, as this will have a central reference reliable and well designed lasers.

  14. Dynamics and Embedded Internet of Things Input Shaping Control for Overhead Cranes Transporting Multibody Payloads

    Directory of Open Access Journals (Sweden)

    Gerardo Peláez

    2018-06-01

    Full Text Available Input shaping is an Optimal Control feedforward strategy whose ability to define how and when a flexible dynamical system defined by Ordinary Differential Equations (ODEs and computer controlled would move into its operative space, without command induced unwanted dynamics, has been exhaustively demonstrated. This work examines the issue of Embedded Internet of Things (IoT Input Shaping with regard to real time control of multibody oscillatory systems whose dynamics are better described by differential algebraic equations (DAEs. An overhead crane hanging a double link multibody payload has been appointed as a benchmark case; it is a multibody, multimode system. This might be worst scenario to implement Input Shaping. The reasons can be found in the wide array of constraints that arise. Firstly, the reliability of the multibody model was tested on a Functional Mock-Up Interface (FMI with the two link payload suspended from the trolley by comparing the experimental video tapping signals in time domain faced with the signals extracted from the multibody model. The FFTs of the simulated and the experimental signal contain the same frequency harmonics only with somewhat different power due to the real world light damping in the joints. The application of this approach may be extended to other cases i.e., the usefulness of mobile hydraulic cranes is limited because the payload is supported by an overhead cable under tension that allows oscillation to occur during crane motion. If the payload size is not negligible small when compared with the cable length may introduce an additional oscillatory mode that creates a multibody double pendulum. To give the insight into the double pendulum dynamics by Lagrangian methods two slender rods as payloads are analyzed dealing with the overhead crane and a composite revolute-revolute joint is proposed to model the cable of the hydraulic crane, both assumptions facilitates an affordable analysis. This allows

  15. Dynamics and Embedded Internet of Things Input Shaping Control for Overhead Cranes Transporting Multibody Payloads.

    Science.gov (United States)

    Peláez, Gerardo; Vaugan, Joshua; Izquierdo, Pablo; Rubio, Higinio; García-Prada, Juan Carlos

    2018-06-04

    Input shaping is an Optimal Control feedforward strategy whose ability to define how and when a flexible dynamical system defined by Ordinary Differential Equations (ODEs) and computer controlled would move into its operative space, without command induced unwanted dynamics, has been exhaustively demonstrated. This work examines the issue of Embedded Internet of Things (IoT) Input Shaping with regard to real time control of multibody oscillatory systems whose dynamics are better described by differential algebraic equations (DAEs). An overhead crane hanging a double link multibody payload has been appointed as a benchmark case; it is a multibody, multimode system. This might be worst scenario to implement Input Shaping. The reasons can be found in the wide array of constraints that arise. Firstly, the reliability of the multibody model was tested on a Functional Mock-Up Interface (FMI) with the two link payload suspended from the trolley by comparing the experimental video tapping signals in time domain faced with the signals extracted from the multibody model. The FFTs of the simulated and the experimental signal contain the same frequency harmonics only with somewhat different power due to the real world light damping in the joints. The application of this approach may be extended to other cases i.e., the usefulness of mobile hydraulic cranes is limited because the payload is supported by an overhead cable under tension that allows oscillation to occur during crane motion. If the payload size is not negligible small when compared with the cable length may introduce an additional oscillatory mode that creates a multibody double pendulum. To give the insight into the double pendulum dynamics by Lagrangian methods two slender rods as payloads are analyzed dealing with the overhead crane and a composite revolute-revolute joint is proposed to model the cable of the hydraulic crane, both assumptions facilitates an affordable analysis. This allows developing a general

  16. A TOTP-based enhanced route optimization procedure for mobile IPv6 to reduce handover delay and signalling overhead.

    Science.gov (United States)

    Shah, Peer Azmat; Hasbullah, Halabi B; Lawal, Ibrahim A; Aminu Mu'azu, Abubakar; Tang Jung, Low

    2014-01-01

    Due to the proliferation of handheld mobile devices, multimedia applications like Voice over IP (VoIP), video conferencing, network music, and online gaming are gaining popularity in recent years. These applications are well known to be delay sensitive and resource demanding. The mobility of mobile devices, running these applications, across different networks causes delay and service disruption. Mobile IPv6 was proposed to provide mobility support to IPv6-based mobile nodes for continuous communication when they roam across different networks. However, the Route Optimization procedure in Mobile IPv6 involves the verification of mobile node's reachability at the home address and at the care-of address (home test and care-of test) that results in higher handover delays and signalling overhead. This paper presents an enhanced procedure, time-based one-time password Route Optimization (TOTP-RO), for Mobile IPv6 Route Optimization that uses the concepts of shared secret Token, time based one-time password (TOTP) along with verification of the mobile node via direct communication and maintaining the status of correspondent node's compatibility. The TOTP-RO was implemented in network simulator (NS-2) and an analytical analysis was also made. Analysis showed that TOTP-RO has lower handover delays, packet loss, and signalling overhead with an increased level of security as compared to the standard Mobile IPv6's Return-Routability-based Route Optimization (RR-RO).

  17. A TOTP-Based Enhanced Route Optimization Procedure for Mobile IPv6 to Reduce Handover Delay and Signalling Overhead

    Science.gov (United States)

    Shah, Peer Azmat; Hasbullah, Halabi B.; Lawal, Ibrahim A.; Aminu Mu'azu, Abubakar; Tang Jung, Low

    2014-01-01

    Due to the proliferation of handheld mobile devices, multimedia applications like Voice over IP (VoIP), video conferencing, network music, and online gaming are gaining popularity in recent years. These applications are well known to be delay sensitive and resource demanding. The mobility of mobile devices, running these applications, across different networks causes delay and service disruption. Mobile IPv6 was proposed to provide mobility support to IPv6-based mobile nodes for continuous communication when they roam across different networks. However, the Route Optimization procedure in Mobile IPv6 involves the verification of mobile node's reachability at the home address and at the care-of address (home test and care-of test) that results in higher handover delays and signalling overhead. This paper presents an enhanced procedure, time-based one-time password Route Optimization (TOTP-RO), for Mobile IPv6 Route Optimization that uses the concepts of shared secret Token, time based one-time password (TOTP) along with verification of the mobile node via direct communication and maintaining the status of correspondent node's compatibility. The TOTP-RO was implemented in network simulator (NS-2) and an analytical analysis was also made. Analysis showed that TOTP-RO has lower handover delays, packet loss, and signalling overhead with an increased level of security as compared to the standard Mobile IPv6's Return-Routability-based Route Optimization (RR-RO). PMID:24688398

  18. COST AND TIME ESTIMATES DURING THE SUPPLIER SELECTION OF AN INFORMATION SYSTEM FOR LEGAL AREA: A CASE STUDY COMPARING TRADITIONAL AND AGILE PROJECT APPROACHES

    Directory of Open Access Journals (Sweden)

    Vieira, G. L. S.

    2017-06-01

    Full Text Available Considering a direct correlation between projects requirements details levels and their performance, this paper aims to evaluate whether the adoption of more extensive and detailed cost, time and scope estimation processes based on both practices, traditional and agile, and executed concurrently with the supplier selection stage, could guarantee greater accuracy in these estimates, thus increasing project success rates. Based on a case study for the information system project implementation into the legal area of a large Brazilian company, five suppliers had their proposals analyzed and compared in terms of the costs and deadlines involved, as well as the project management processes used in theirs estimates. From the obtained results, it was possible to observe that not all companies follow, at least during the prospecting phase, their service proposals described management processes, according to the theory. Another important finding was that the proposals involving, at least partially, agile approach concepts, were more likely to justify their estimates. These proposals still presented lower values, whenever compared to those less adherents to the theoretical concepts, as those based on traditional concepts.

  19. Quantum process estimation via generic two-body correlations

    International Nuclear Information System (INIS)

    Mohseni, M.; Rezakhani, A. T.; Barreiro, J. T.; Kwiat, P. G.; Aspuru-Guzik, A.

    2010-01-01

    Performance of quantum process estimation is naturally limited by fundamental, random, and systematic imperfections of preparations and measurements. These imperfections may lead to considerable errors in the process reconstruction because standard data-analysis techniques usually presume ideal devices. Here, by utilizing generic auxiliary quantum or classical correlations, we provide a framework for the estimation of quantum dynamics via a single measurement apparatus. By construction, this approach can be applied to quantum tomography schemes with calibrated faulty-state generators and analyzers. Specifically, we present a generalization of the work begun by M. Mohseni and D. A. Lidar [Phys. Rev. Lett. 97, 170501 (2006)] with an imperfect Bell-state analyzer. We demonstrate that for several physically relevant noisy preparations and measurements, classical correlations and a small data-processing overhead suffice to accomplish the full system identification. Furthermore, we provide the optimal input states whereby the error amplification due to inversion of the measurement data is minimal.

  20. Efficient Estimation of Dynamic Density Functions with Applications in Streaming Data

    KAUST Repository

    Qahtan, Abdulhakim

    2016-05-11

    Recent advances in computing technology allow for collecting vast amount of data that arrive continuously in the form of streams. Mining data streams is challenged by the speed and volume of the arriving data. Furthermore, the underlying distribution of the data changes over the time in unpredicted scenarios. To reduce the computational cost, data streams are often studied in forms of condensed representation, e.g., Probability Density Function (PDF). This thesis aims at developing an online density estimator that builds a model called KDE-Track for characterizing the dynamic density of the data streams. KDE-Track estimates the PDF of the stream at a set of resampling points and uses interpolation to estimate the density at any given point. To reduce the interpolation error and computational complexity, we introduce adaptive resampling where more/less resampling points are used in high/low curved regions of the PDF. The PDF values at the resampling points are updated online to provide up-to-date model of the data stream. Comparing with other existing online density estimators, KDE-Track is often more accurate (as reflected by smaller error values) and more computationally efficient (as reflected by shorter running time). The anytime available PDF estimated by KDE-Track can be applied for visualizing the dynamic density of data streams, outlier detection and change detection in data streams. In this thesis work, the first application is to visualize the taxi traffic volume in New York city. Utilizing KDE-Track allows for visualizing and monitoring the traffic flow on real time without extra overhead and provides insight analysis of the pick up demand that can be utilized by service providers to improve service availability. The second application is to detect outliers in data streams from sensor networks based on the estimated PDF. The method detects outliers accurately and outperforms baseline methods designed for detecting and cleaning outliers in sensor data. The

  1. Approaches in estimation of external cost for fuel cycles in the ExternE project

    International Nuclear Information System (INIS)

    Afanas'ev, A.A.; Maksimenko, B.N.

    1998-01-01

    The purposes, content and main results of studies realized within the frameworks of the International Project ExternE which is the first comprehensive attempt to develop general approach to estimation of external cost for different fuel cycles based on utilization of nuclear and fossil fuels, as well as on renewable power sources are discussed. The external cost of a fuel cycle is treated as social and environmental expenditures which are not taken into account by energy producers and consumers, i.e. these are expenditures not included into commercial cost nowadays. The conclusion on applicability of the approach suggested for estimation of population health hazards and environmental impacts connected with electric power generation growth (expressed in money or some other form) is made

  2. The NASA Bed Rest Project

    Science.gov (United States)

    Rhodes, Bradley; Meck, Janice

    2005-01-01

    NASA s National Vision for Space Exploration includes human travel beyond low earth orbit and the ultimate safe return of the crews. Crucial to fulfilling the vision is the successful and timely development of countermeasures for the adverse physiological effects on human systems caused by long term exposure to the microgravity environment. Limited access to in-flight resources for the foreseeable future increases NASA s reliance on ground-based analogs to simulate these effects of microgravity. The primary analog for human based research will be head-down bed rest. By this approach NASA will be able to evaluate countermeasures in large sample sizes, perform preliminary evaluations of proposed in-flight protocols and assess the utility of individual or combined strategies before flight resources are requested. In response to this critical need, NASA has created the Bed Rest Project at the Johnson Space Center. The Project establishes the infrastructure and processes to provide a long term capability for standardized domestic bed rest studies and countermeasure development. The Bed Rest Project design takes a comprehensive, interdisciplinary, integrated approach that reduces the resource overhead of one investigator for one campaign. In addition to integrating studies operationally relevant for exploration, the Project addresses other new Vision objectives, namely: 1) interagency cooperation with the NIH allows for Clinical Research Center (CRC) facility sharing to the benefit of both agencies, 2) collaboration with our International Partners expands countermeasure development opportunities for foreign and domestic investigators as well as promotes consistency in approach and results, 3) to the greatest degree possible, the Project also advances research by clinicians and academia alike to encourage return to earth benefits. This paper will describe the Project s top level goals, organization and relationship to other Exploration Vision Projects, implementation

  3. The Ewe’s Reproductive Performance, Growth Rate and Carcass Quality of Lambs Kept in a Barn vs Those Kept under an Overhead Shelter

    Directory of Open Access Journals (Sweden)

    Ewa Kuźnicka

    2013-02-01

    Full Text Available A herd of polish lowland local sheep was divided into two equal groups: the first group was kept under an overhead shelter, and the second group was kept in a warm barn. The effect of maintenance on ewe’s reproductive performance, survival as well as the growth rate of lambs, and their carcasses quality was investigated. The lack of differences in fertility and prolificacy of ewes as well as in the survival and growth rate between the groups confirmed a good adaptation of Żelaźnieńska sheep to low temperature. Harsh environmental conditions did not cause a significant decrease of the body weight growth; however, they brought in an (insignificant reduction of subcutaneous fat thickness and meatiness of the loin part of a lamb’s body. The fat content of carcasses obtained from lambs reared under the overhead shelter was significantly lower, with no differences of meat and bones contribution between the groups.

  4. Flood risk assessment in France: comparison of extreme flood estimation methods (EXTRAFLO project, Task 7)

    Science.gov (United States)

    Garavaglia, F.; Paquet, E.; Lang, M.; Renard, B.; Arnaud, P.; Aubert, Y.; Carre, J.

    2013-12-01

    In flood risk assessment the methods can be divided in two families: deterministic methods and probabilistic methods. In the French hydrologic community the probabilistic methods are historically preferred to the deterministic ones. Presently a French research project named EXTRAFLO (RiskNat Program of the French National Research Agency, https://extraflo.cemagref.fr) deals with the design values for extreme rainfall and floods. The object of this project is to carry out a comparison of the main methods used in France for estimating extreme values of rainfall and floods, to obtain a better grasp of their respective fields of application. In this framework we present the results of Task 7 of EXTRAFLO project. Focusing on French watersheds, we compare the main extreme flood estimation methods used in French background: (i) standard flood frequency analysis (Gumbel and GEV distribution), (ii) regional flood frequency analysis (regional Gumbel and GEV distribution), (iii) local and regional flood frequency analysis improved by historical information (Naulet et al., 2005), (iv) simplify probabilistic method based on rainfall information (i.e. Gradex method (CFGB, 1994), Agregee method (Margoum, 1992) and Speed method (Cayla, 1995)), (v) flood frequency analysis by continuous simulation approach and based on rainfall information (i.e. Schadex method (Paquet et al., 2013, Garavaglia et al., 2010), Shyreg method (Lavabre et al., 2003)) and (vi) multifractal approach. The main result of this comparative study is that probabilistic methods based on additional information (i.e. regional, historical and rainfall information) provide better estimations than the standard flood frequency analysis. Another interesting result is that, the differences between the various extreme flood quantile estimations of compared methods increase with return period, staying relatively moderate up to 100-years return levels. Results and discussions are here illustrated throughout with the example

  5. Comparison of overhead line lightning performance based on two different tower geometries

    DEFF Research Database (Denmark)

    Ebdrup, Thomas; Olason, Daniel; Bak, Claus Leth

    2014-01-01

    of the substation and transmission line is of great importance as it is a part of the 400 kV backbone between Sweden, Norway, Germany and the offshore wind farms in Horns Rev, Denmark. The new Eagle pylon has been designed with the focus of minimizing the visual impacted of overhead lines. A detailed lightning...... performance analysis of the existing Donau and the new Eagle pylon is therefore important in order to assess the risk of failure. The lightning strike analysis is based on the number of strikes expected to terminate on the line and an investigation of how many of these there may be expected to cause...... better protected from direct stroke than the phase conductors on the Donau pylon. Furthermore with respect to a backflash, the Eagle has a better performance than the Donau pylon. It is therefore concluded that the Eagle has a better lightning performance than the Donau....

  6. SNE's methodological basis - web-based software in entrepreneurial surveys

    DEFF Research Database (Denmark)

    Madsen, Henning

    This overhead based paper gives an introduction to the research methodology applied in the surveys carried out in the SNE-project.......This overhead based paper gives an introduction to the research methodology applied in the surveys carried out in the SNE-project....

  7. Underground cables as an alternative to overhead lines. A comparison of economic and technical aspects of voltages over 22 kV

    Energy Technology Data Exchange (ETDEWEB)

    Trohjell, J.E.; Vognild, I.H.

    1994-07-11

    The report presents technical and economical aspects of underground cables compared to overhead lines in Norway in high voltage transmission systems above 22 kV. The economical comparison between the two options includes capital costs of installation (investment costs), maintenance costs and costs of electrical losses. The main technical issues discussed are reliability and flexibility. 35 refs., 23 figs., 29 tabs.

  8. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  9. A study of the planned value estimation method for developing earned value management system in the nuclear power plant construction project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, S.H.; Moon, B.S., E-mail: gustblast@khnp.co.kr, E-mail: moonbs@khnp.co.kr [Korea Hydro & Nuclear power co.,Ltd., Central Research Inst., Daejeon (Korea, Republic of); Lee, J.H., E-mail: ljh@kkprotech.com [Kong Kwan Protech Co.,Ltd., Seoul (Korea, Republic of)

    2014-07-01

    The Earned Value Management System (EVMS) is a project management technique for measuring project performance and progress, and then forward projection through the integrated management and control of cost and schedule. This research reviewed the concept of the EVMS method, and proposes two Planned Value estimation methods for the potential application to succeeding NPP construction projects by using the historical data from the proceeding NPP projects. This paper is to introduce the solution for the problems caused by the absence of relevant management system incorporating schedule and cost, which has arisen as repeated issues in NPP construction project management. (author)

  10. A study of the planned value estimation method for developing earned value management system in the nuclear power plant construction project

    International Nuclear Information System (INIS)

    Lee, S.H.; Moon, B.S.; Lee, J.H.

    2014-01-01

    The Earned Value Management System (EVMS) is a project management technique for measuring project performance and progress, and then forward projection through the integrated management and control of cost and schedule. This research reviewed the concept of the EVMS method, and proposes two Planned Value estimation methods for the potential application to succeeding NPP construction projects by using the historical data from the proceeding NPP projects. This paper is to introduce the solution for the problems caused by the absence of relevant management system incorporating schedule and cost, which has arisen as repeated issues in NPP construction project management. (author)

  11. The SKI-project External events - Phase 2. Estimation of fire frequencies per plant and per building

    International Nuclear Information System (INIS)

    Poern, K.

    1996-08-01

    The Swedish-Finnish handbook for initiating event frequencies, I-Book, does not contain any fire frequencies. This matter of fact is not defensible considering the substantial risk contribution caused by fires. In the PSAs performed hitherto the initiating fire frequencies have been determined from case to case. Because data are usually very scarce in these areas it is very important to develop unique definitions, to systematically utilize both international and national experiences and to establish an appropriate statistical estimation method. It is also important to present the accumulated experience such that it can be used for different purposes, not only within PSA but also in the concrete fire preventive work. During phase 1 of the project External Events an inventory was made of existing methods for probabilistic fire analysis in general. During phase 2 of the project it was decided to initialize the work on a complementary handbook, called X-Book, in order to encompass the frequencies of system external events, i.e. initiating events that are caused by events occurring outside the system boundaries. In Version 1 of the X-Book the attention is mainly focussed on the estimation of initiating fire frequencies, per plant and per building. This estimation is basically founded on reports that the power companies have collected for this specific purpose. This report describes the statistical model and method that have been used in the estimation process. The methodological results achieved may, possibly after some modification, be applicable also to other types of system external events

  12. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  13. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Science.gov (United States)

    2012-01-01

    Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs) ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV), and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to provide information on the

  14. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  15. Smooth Approximation l 0-Norm Constrained Affine Projection Algorithm and Its Applications in Sparse Channel Estimation

    Science.gov (United States)

    2014-01-01

    We propose a smooth approximation l 0-norm constrained affine projection algorithm (SL0-APA) to improve the convergence speed and the steady-state error of affine projection algorithm (APA) for sparse channel estimation. The proposed algorithm ensures improved performance in terms of the convergence speed and the steady-state error via the combination of a smooth approximation l 0-norm (SL0) penalty on the coefficients into the standard APA cost function, which gives rise to a zero attractor that promotes the sparsity of the channel taps in the channel estimation and hence accelerates the convergence speed and reduces the steady-state error when the channel is sparse. The simulation results demonstrate that our proposed SL0-APA is superior to the standard APA and its sparsity-aware algorithms in terms of both the convergence speed and the steady-state behavior in a designated sparse channel. Furthermore, SL0-APA is shown to have smaller steady-state error than the previously proposed sparsity-aware algorithms when the number of nonzero taps in the sparse channel increases. PMID:24790588

  16. Critical analysis of the Hanford spent nuclear fuel project activity based cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    Warren, R.N.

    1998-09-29

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI`s review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI`s review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI`s scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES.

  17. Cost Estimating Handbook for Environmental Restoration

    International Nuclear Information System (INIS)

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  18. A TOTP-Based Enhanced Route Optimization Procedure for Mobile IPv6 to Reduce Handover Delay and Signalling Overhead

    Directory of Open Access Journals (Sweden)

    Peer Azmat Shah

    2014-01-01

    Full Text Available Due to the proliferation of handheld mobile devices, multimedia applications like Voice over IP (VoIP, video conferencing, network music, and online gaming are gaining popularity in recent years. These applications are well known to be delay sensitive and resource demanding. The mobility of mobile devices, running these applications, across different networks causes delay and service disruption. Mobile IPv6 was proposed to provide mobility support to IPv6-based mobile nodes for continuous communication when they roam across different networks. However, the Route Optimization procedure in Mobile IPv6 involves the verification of mobile node’s reachability at the home address and at the care-of address (home test and care-of test that results in higher handover delays and signalling overhead. This paper presents an enhanced procedure, time-based one-time password Route Optimization (TOTP-RO, for Mobile IPv6 Route Optimization that uses the concepts of shared secret Token, time based one-time password (TOTP along with verification of the mobile node via direct communication and maintaining the status of correspondent node’s compatibility. The TOTP-RO was implemented in network simulator (NS-2 and an analytical analysis was also made. Analysis showed that TOTP-RO has lower handover delays, packet loss, and signalling overhead with an increased level of security as compared to the standard Mobile IPv6’s Return-Routability-based Route Optimization (RR-RO.

  19. Parameter Estimation of Permanent Magnet Synchronous Motor Using Orthogonal Projection and Recursive Least Squares Combinatorial Algorithm

    Directory of Open Access Journals (Sweden)

    Iman Yousefi

    2015-01-01

    Full Text Available This paper presents parameter estimation of Permanent Magnet Synchronous Motor (PMSM using a combinatorial algorithm. Nonlinear fourth-order space state model of PMSM is selected. This model is rewritten to the linear regression form without linearization. Noise is imposed to the system in order to provide a real condition, and then combinatorial Orthogonal Projection Algorithm and Recursive Least Squares (OPA&RLS method is applied in the linear regression form to the system. Results of this method are compared to the Orthogonal Projection Algorithm (OPA and Recursive Least Squares (RLS methods to validate the feasibility of the proposed method. Simulation results validate the efficacy of the proposed algorithm.

  20. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  1. Study of a phase-to-ground fault on a 400 kV overhead transmission line

    Science.gov (United States)

    Iagăr, A.; Popa, G. N.; Diniş, C. M.

    2018-01-01

    Power utilities need to supply their consumers at high power quality level. Because the faults that occur on High-Voltage and Extra-High-Voltage transmission lines can cause serious damages in underlying transmission and distribution systems, it is important to examine each fault in detail. In this work we studied a phase-to-ground fault (on phase 1) of 400 kV overhead transmission line Mintia-Arad. Indactic® 650 fault analyzing system was used to record the history of the fault. Signals (analog and digital) recorded by Indactic® 650 were visualized and analyzed by Focus program. Summary of fault report allowed evaluation of behavior of control and protection equipment and determination of cause and location of the fault.

  2. Damage of the Unit 1 reactor building overhead bridge crane at Onagawa Nuclear Power Station caused by the Great East Japan Earthquake and its repair works

    International Nuclear Information System (INIS)

    Sugamata, Norihiko

    2014-01-01

    The driving shaft bearings of the Unit 1 overhead bridge crane were damaged by the Great East Japan Earthquake at Onagawa Nuclear Power Station. The situation, investigation and repair works of the bearing failure are introduced in this paper. (author)

  3. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  4. Maintenance planning for transmission routes with medium voltage overlines - experience within the framework of two pilot projects; Trassenpflegeplanung fuer Mittel- und Hochspannungsfreileitungen - Erfahrungen von zwei Pilotprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Geiges, H. [Ingenieurbuero Geiges, Freiraum- und Landschaftsplanung, Laumersheim (Germany)

    1997-11-03

    On the basis of the `VDEW Orientation Aid for Maintenance Measures in Transmission Routes` two pilot projects were selected in a 110 kV and a 20 kV overhead transmission route. (orig.) [Deutsch] Auf der Grundlage der `VDEW-Orientierungshilfe zu Pflegemassnahmen in Leitungstrassen` wurden Pilotprojekte in einer 110-kV- und in einer 20-kV-Freileitungstrasse im suedlichen Pfaelzerwald ausgewaehlt. (orig.)

  5. Communication Characteristics of Faulted Overhead High Voltage Power Lines at Low Radio Frequencies

    Directory of Open Access Journals (Sweden)

    Nermin Suljanović

    2017-11-01

    Full Text Available This paper derives a model of high-voltage overhead power line under fault conditions at low radio frequencies. The derived model is essential for design of communication systems to reliably transfer information over high voltage power lines. In addition, the model can also benefit advanced systems for power-line fault detection and classification exploiting the phenomenon of changed conditions on faulted power line, resulting in change of low radio frequency signal propagation. The methodology used in the paper is based on the multiconductor system analysis and propagation of electromagnetic waves over the power lines. The model for the high voltage power line under normal operation is validated using actual measurements obtained on 400 kV power line. The proposed model of faulted power lines extends the validated power-line model under normal operation. Simulation results are provided for typical power line faults and typical fault locations. Results clearly indicate sensitivity of power-line frequency response on different fault types.

  6. THE LICK AGN MONITORING PROJECT: RECALIBRATING SINGLE-EPOCH VIRIAL BLACK HOLE MASS ESTIMATES

    Energy Technology Data Exchange (ETDEWEB)

    Park, Daeseong; Woo, Jong-Hak [Astronomy Program, Department of Physics and Astronomy, Seoul National University, Seoul 151-742 (Korea, Republic of); Treu, Tommaso; Bennert, Vardha N. [Department of Physics, University of California, Santa Barbara, CA 93106 (United States); Barth, Aaron J.; Walsh, Jonelle [Department of Physics and Astronomy, 4129 Frederick Reines Hall, University of California, Irvine, CA 92697-4575 (United States); Bentz, Misty C. [Department of Physics and Astronomy, Georgia State University Atlanta, GA 30303 (United States); Canalizo, Gabriela [Department of Physics and Astronomy, University of California, Riverside, 900 University Ave., Riverside, CA 92521 (United States); Filippenko, Alexei V. [Department of Astronomy, University of California, Berkeley, CA 94720-3411 (United States); Gates, Elinor [Lick Observatory, P.O. Box 85, Mount Hamilton, CA 95140 (United States); Greene, Jenny E. [Department of Astrophysical Sciences, Princeton University, Princeton, NJ 08544 (United States); Malkan, Matthew A., E-mail: woo@astro.snu.ac.kr [Department of Physics and Astronomy, University of California, Los Angeles, CA 90024 (United States)

    2012-03-01

    We investigate the calibration and uncertainties of black hole (BH) mass estimates based on the single-epoch (SE) method, using homogeneous and high-quality multi-epoch spectra obtained by the Lick Active Galactic Nucleus (AGN) Monitoring Project for nine local Seyfert 1 galaxies with BH masses <10{sup 8} M{sub Sun }. By decomposing the spectra into their AGNs and stellar components, we study the variability of the SE H{beta} line width (full width at half-maximum intensity, FWHM{sub H{beta}} or dispersion, {sigma}{sub H{beta}}) and of the AGN continuum luminosity at 5100 A (L{sub 5100}). From the distribution of the 'virial products' ({proportional_to} FWHM{sub H{beta}}{sup 2} L{sup 0.5}{sub 5100} or {sigma}{sub H{beta}}{sup 2} L{sup 0.5}{sub 5100}) measured from SE spectra, we estimate the uncertainty due to the combined variability as {approx}0.05 dex (12%). This is subdominant with respect to the total uncertainty in SE mass estimates, which is dominated by uncertainties in the size-luminosity relation and virial coefficient, and is estimated to be {approx}0.46 dex (factor of {approx}3). By comparing the H{beta} line profile of the SE, mean, and root-mean-square (rms) spectra, we find that the H{beta} line is broader in the mean (and SE) spectra than in the rms spectra by {approx}0.1 dex (25%) for our sample with FWHM{sub H{beta}} <3000 km s{sup -1}. This result is at variance with larger mass BHs where the difference is typically found to be much less than 0.1 dex. To correct for this systematic difference of the H{beta} line profile, we introduce a line-width dependent virial factor, resulting in a recalibration of SE BH mass estimators for low-mass AGNs.

  7. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Russell, E.W.; Clarke, W. [Lawrence Livermore National Lab., CA (United States); Domian, H.A. [Babcock and Wilcox Co., Lynchburg, VA (United States); Madson, A.A. [Kaiser Engineers California Corp., Oakland, CA (United States)

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B&S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs.

  8. Cost estimate of high-level radioactive waste containers for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Russell, E.W.; Clarke, W.; Domian, H.A.; Madson, A.A.

    1991-08-01

    This report summarizes the bottoms-up cost estimates for fabrication of high-level radioactive waste disposal containers based on the Site Characterization Plan Conceptual Design (SCP-CD). These estimates were acquired by Babcock and Wilcox (B ampersand S) under sub-contract to Lawrence Livermore National Laboratory (LLNL) for the Yucca Mountain Site Characterization Project (YMP). The estimates were obtained for two leading container candidate materials (Alloy 825 and CDA 715), and from other three vendors who were selected from a list of twenty solicited. Three types of container designs were analyzed that represent containers for spent fuel, and for vitrified high-level waste (HLW). The container internal structures were assumed to be AISI-304 stainless steel in all cases, with an annual production rate of 750 containers. Subjective techniques were used for estimating QA/QC costs based on vendor experience and the specifications derived for the LLNL-YMP Quality Assurance program. In addition, an independent QA/QC analysis is reported which was prepared by Kasier Engineering. Based on the cost estimates developed, LLNL recommends that values of $825K and $62K be used for the 1991 TSLCC for the spent fuel and HLW containers, respectively. These numbers represent the most conservative among the three vendors, and are for the high-nickel anstenitic steel (Alloy 825). 6 refs., 7 figs

  9. Adaptive output-based command shaping for sway control of a 3D overhead crane with payload hoisting and wind disturbance

    Science.gov (United States)

    Abdullahi, Auwalu M.; Mohamed, Z.; Selamat, H.; Pota, Hemanshu R.; Zainal Abidin, M. S.; Ismail, F. S.; Haruna, A.

    2018-01-01

    Payload hoisting and wind disturbance during crane operations are among the challenging factors that affect a payload sway and thus, affect the crane's performance. This paper proposes a new online adaptive output-based command shaping (AOCS) technique for an effective payload sway reduction of an overhead crane under the influence of those effects. This technique enhances the previously developed output-based command shaping (OCS) which was effective only for a fixed system and without external disturbances. Unlike the conventional input shaping design technique which requires the system's natural frequency and damping ratio, the proposed technique is designed by using the output signal and thus, an online adaptive algorithm can be formulated. To test the effectiveness of the AOCS, experiments are carried out using a laboratory overhead crane with a payload hoisting in the presence of wind, and with different payloads. The superiority of the method is confirmed by 82% and 29% reductions in the overall sway and the maximum transient sway respectively, when compared to the OCS, and two robust input shapers namely Zero Vibration Derivative-Derivative and Extra-Insensitive shapers. Furthermore, the method demonstrates a uniform crane's performance under all conditions. It is envisaged that the proposed method can be very useful in designing an effective controller for a crane system with an unknown payload and under the influence of external disturbances.

  10. WHE-PAGER Project: A new initiative in estimating global building inventory and its seismic vulnerability

    Science.gov (United States)

    Porter, K.A.; Jaiswal, K.S.; Wald, D.J.; Greene, M.; Comartin, Craig

    2008-01-01

    The U.S. Geological Survey’s Prompt Assessment of Global Earthquake’s Response (PAGER) Project and the Earthquake Engineering Research Institute’s World Housing Encyclopedia (WHE) are creating a global database of building stocks and their earthquake vulnerability. The WHE already represents a growing, community-developed public database of global housing and its detailed structural characteristics. It currently contains more than 135 reports on particular housing types in 40 countries. The WHE-PAGER effort extends the WHE in several ways: (1) by addressing non-residential construction; (2) by quantifying the prevalence of each building type in both rural and urban areas; (3) by addressing day and night occupancy patterns, (4) by adding quantitative vulnerability estimates from judgment or statistical observation; and (5) by analytically deriving alternative vulnerability estimates using in part laboratory testing.

  11. Estimating unbiased economies of scale of HIV prevention projects: a case study of Avahan.

    Science.gov (United States)

    Lépine, Aurélia; Vassall, Anna; Chandrashekar, Sudha; Blanc, Elodie; Le Nestour, Alexis

    2015-04-01

    Governments and donors are investing considerable resources on HIV prevention in order to scale up these services rapidly. Given the current economic climate, providers of HIV prevention services increasingly need to demonstrate that these investments offer good 'value for money'. One of the primary routes to achieve efficiency is to take advantage of economies of scale (a reduction in the average cost of a health service as provision scales-up), yet empirical evidence on economies of scale is scarce. Methodologically, the estimation of economies of scale is hampered by several statistical issues preventing causal inference and thus making the estimation of economies of scale complex. In order to estimate unbiased economies of scale when scaling up HIV prevention services, we apply our analysis to one of the few HIV prevention programmes globally delivered at a large scale: the Indian Avahan initiative. We costed the project by collecting data from the 138 Avahan NGOs and the supporting partners in the first four years of its scale-up, between 2004 and 2007. We develop a parsimonious empirical model and apply a system Generalized Method of Moments (GMM) and fixed-effects Instrumental Variable (IV) estimators to estimate unbiased economies of scale. At the programme level, we find that, after controlling for the endogeneity of scale, the scale-up of Avahan has generated high economies of scale. Our findings suggest that average cost reductions per person reached are achievable when scaling-up HIV prevention in low and middle income countries. Copyright © 2015 Elsevier Ltd. All rights reserved.

  12. CONTAMINATED SOIL VOLUME ESTIMATE TRACKING METHODOLOGY

    International Nuclear Information System (INIS)

    Durham, L.A.; Johnson, R.L.; Rieman, C.; Kenna, T.; Pilon, R.

    2003-01-01

    The U.S. Army Corps of Engineers (USACE) is conducting a cleanup of radiologically contaminated properties under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The largest cost element for most of the FUSRAP sites is the transportation and disposal of contaminated soil. Project managers and engineers need an estimate of the volume of contaminated soil to determine project costs and schedule. Once excavation activities begin and additional remedial action data are collected, the actual quantity of contaminated soil often deviates from the original estimate, resulting in cost and schedule impacts to the project. The project costs and schedule need to be frequently updated by tracking the actual quantities of excavated soil and contaminated soil remaining during the life of a remedial action project. A soil volume estimate tracking methodology was developed to provide a mechanism for project managers and engineers to create better project controls of costs and schedule. For the FUSRAP Linde site, an estimate of the initial volume of in situ soil above the specified cleanup guidelines was calculated on the basis of discrete soil sample data and other relevant data using indicator geostatistical techniques combined with Bayesian analysis. During the remedial action, updated volume estimates of remaining in situ soils requiring excavation were calculated on a periodic basis. In addition to taking into account the volume of soil that had been excavated, the updated volume estimates incorporated both new gamma walkover surveys and discrete sample data collected as part of the remedial action. A civil survey company provided periodic estimates of actual in situ excavated soil volumes. By using the results from the civil survey of actual in situ volumes excavated and the updated estimate of the remaining volume of contaminated soil requiring excavation, the USACE Buffalo District was able to forecast and update project costs and schedule. The soil volume

  13. A novel recursive Fourier transform for nonuniform sampled signals: application to heart rate variability spectrum estimation.

    Science.gov (United States)

    Holland, Alexander; Aboy, Mateo

    2009-07-01

    We present a novel method to iteratively calculate discrete Fourier transforms for discrete time signals with sample time intervals that may be widely nonuniform. The proposed recursive Fourier transform (RFT) does not require interpolation of the samples to uniform time intervals, and each iterative transform update of N frequencies has computational order N. Because of the inherent non-uniformity in the time between successive heart beats, an application particularly well suited for this transform is power spectral density (PSD) estimation for heart rate variability. We compare RFT based spectrum estimation with Lomb-Scargle Transform (LST) based estimation. PSD estimation based on the LST also does not require uniform time samples, but the LST has a computational order greater than Nlog(N). We conducted an assessment study involving the analysis of quasi-stationary signals with various levels of randomly missing heart beats. Our results indicate that the RFT leads to comparable estimation performance to the LST with significantly less computational overhead and complexity for applications requiring iterative spectrum estimations.

  14. An information-guided channel-hopping scheme for block-fading channels with estimation errors

    KAUST Repository

    Yang, Yuli

    2010-12-01

    Information-guided channel-hopping technique employing multiple transmit antennas was previously proposed for supporting high data rate transmission over fading channels. This scheme achieves higher data rates than some mature schemes, such as the well-known cyclic transmit antenna selection and space-time block coding, by exploiting the independence character of multiple channels, which effectively results in having an additional information transmitting channel. Moreover, maximum likelihood decoding may be performed by simply decoupling the signals conveyed by the different mapping methods. In this paper, we investigate the achievable spectral efficiency of this scheme in the case of having channel estimation errors, with optimum pilot overhead for minimum meansquare error channel estimation, when transmitting over blockfading channels. Our numerical results further substantiate the robustness of the presented scheme, even with imperfect channel state information. ©2010 IEEE.

  15. Estimating 4D-CBCT from prior information and extremely limited angle projections using structural PCA and weighted free-form deformation for lung radiotherapy.

    Science.gov (United States)

    Harris, Wendy; Zhang, You; Yin, Fang-Fang; Ren, Lei

    2017-03-01

    To investigate the feasibility of using structural-based principal component analysis (PCA) motion-modeling and weighted free-form deformation to estimate on-board 4D-CBCT using prior information and extremely limited angle projections for potential 4D target verification of lung radiotherapy. A technique for lung 4D-CBCT reconstruction has been previously developed using a deformation field map (DFM)-based strategy. In the previous method, each phase of the 4D-CBCT was generated by deforming a prior CT volume. The DFM was solved by a motion model extracted by a global PCA and free-form deformation (GMM-FD) technique, using a data fidelity constraint and deformation energy minimization. In this study, a new structural PCA method was developed to build a structural motion model (SMM) by accounting for potential relative motion pattern changes between different anatomical structures from simulation to treatment. The motion model extracted from planning 4DCT was divided into two structures: tumor and body excluding tumor, and the parameters of both structures were optimized together. Weighted free-form deformation (WFD) was employed afterwards to introduce flexibility in adjusting the weightings of different structures in the data fidelity constraint based on clinical interests. XCAT (computerized patient model) simulation with a 30 mm diameter lesion was simulated with various anatomical and respiratory changes from planning 4D-CT to on-board volume to evaluate the method. The estimation accuracy was evaluated by the volume percent difference (VPD)/center-of-mass-shift (COMS) between lesions in the estimated and "ground-truth" on-board 4D-CBCT. Different on-board projection acquisition scenarios and projection noise levels were simulated to investigate their effects on the estimation accuracy. The method was also evaluated against three lung patients. The SMM-WFD method achieved substantially better accuracy than the GMM-FD method for CBCT estimation using extremely

  16. Improved Ancestry Estimation for both Genotyping and Sequencing Data using Projection Procrustes Analysis and Genotype Imputation

    Science.gov (United States)

    Wang, Chaolong; Zhan, Xiaowei; Liang, Liming; Abecasis, Gonçalo R.; Lin, Xihong

    2015-01-01

    Accurate estimation of individual ancestry is important in genetic association studies, especially when a large number of samples are collected from multiple sources. However, existing approaches developed for genome-wide SNP data do not work well with modest amounts of genetic data, such as in targeted sequencing or exome chip genotyping experiments. We propose a statistical framework to estimate individual ancestry in a principal component ancestry map generated by a reference set of individuals. This framework extends and improves upon our previous method for estimating ancestry using low-coverage sequence reads (LASER 1.0) to analyze either genotyping or sequencing data. In particular, we introduce a projection Procrustes analysis approach that uses high-dimensional principal components to estimate ancestry in a low-dimensional reference space. Using extensive simulations and empirical data examples, we show that our new method (LASER 2.0), combined with genotype imputation on the reference individuals, can substantially outperform LASER 1.0 in estimating fine-scale genetic ancestry. Specifically, LASER 2.0 can accurately estimate fine-scale ancestry within Europe using either exome chip genotypes or targeted sequencing data with off-target coverage as low as 0.05×. Under the framework of LASER 2.0, we can estimate individual ancestry in a shared reference space for samples assayed at different loci or by different techniques. Therefore, our ancestry estimation method will accelerate discovery in disease association studies not only by helping model ancestry within individual studies but also by facilitating combined analysis of genetic data from multiple sources. PMID:26027497

  17. Field activity cost estimates for the first 3 years of the World Bank Loan Project for schistosomiasis control in China.

    Science.gov (United States)

    Guo, J; Booth, M; Jenkins, J; Wang, H; Tanner, M

    1998-12-01

    The World Bank Loan Project for schistosomiasis in China commenced field activities in 1992. In this paper, we describe disease control strategies for levels of different endemicity, and estimate unit costs and total expenditure of screening, treatment (cattle and humans) and snail control for 8 provinces where Schistosoma japonicum infection is endemic. Overall, we estimate that more than 21 million US dollars were spent on field activities during the first three years of the project. Mollusciciding (43% of the total expenditure) and screening (28% of the total) are estimated to have the most expensive field activities. However, despite the expense of screening, a simple model predicts that selective chemotherapy could have been cheaper than mass chemotherapy in areas where infection prevalence was higher than 15%, which was the threshold for mass chemotherapy intervention. It is concluded that considerable cost savings could be made in the future by narrowing the scope of snail control activities, redefining the threshold infection prevalence for mass chemotherapy, defining smaller administrative units, and developing rapid assessment tools.

  18. The influence of plastic deformation and chemical environment on the resistively of al-alloy overhead lines

    Directory of Open Access Journals (Sweden)

    Nowak-Woźny D.

    2005-01-01

    Full Text Available The electrical resistively and intensity of X-ray diffraction reflexes were determined for overhead line wires deformed plastically and immersed at different solutions. Immersing (chemical ageing was performed by plastic deformation along the wire axis. During chemical ageing the samples were exposed to the action of the Cl-, SO4 2-, and SO3 2- ions. Resistively was measured at room temperature and at liquid nitrogen temperature. After the X-ray and resistively measurement data were compared, it was found that three processes could take place: the flow of ions through the boundary between a sample and environment; the mechanical relaxation of vacancies near a line of dislocations, and the ordering of microstructure. These effects can lead to the anisotropy of resistively.

  19. A Simple Sampling Method for Estimating the Accuracy of Large Scale Record Linkage Projects.

    Science.gov (United States)

    Boyd, James H; Guiver, Tenniel; Randall, Sean M; Ferrante, Anna M; Semmens, James B; Anderson, Phil; Dickinson, Teresa

    2016-05-17

    Record linkage techniques allow different data collections to be brought together to provide a wider picture of the health status of individuals. Ensuring high linkage quality is important to guarantee the quality and integrity of research. Current methods for measuring linkage quality typically focus on precision (the proportion of incorrect links), given the difficulty of measuring the proportion of false negatives. The aim of this work is to introduce and evaluate a sampling based method to estimate both precision and recall following record linkage. In the sampling based method, record-pairs from each threshold (including those below the identified cut-off for acceptance) are sampled and clerically reviewed. These results are then applied to the entire set of record-pairs, providing estimates of false positives and false negatives. This method was evaluated on a synthetically generated dataset, where the true match status (which records belonged to the same person) was known. The sampled estimates of linkage quality were relatively close to actual linkage quality metrics calculated for the whole synthetic dataset. The precision and recall measures for seven reviewers were very consistent with little variation in the clerical assessment results (overall agreement using the Fleiss Kappa statistics was 0.601). This method presents as a possible means of accurately estimating matching quality and refining linkages in population level linkage studies. The sampling approach is especially important for large project linkages where the number of record pairs produced may be very large often running into millions.

  20. Guideline to Estimate Decommissioning Costs

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Kim, Younggook; Oh, Jaeyoung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The primary objective of this work is to provide guidelines to estimate the decommissioning cost as well as the stakeholders with plausible information to understand the decommissioning activities in a reasonable manner, which eventually contribute to acquiring the public acceptance for the nuclear power industry. Although several cases of the decommissioning cost estimate have been made for a few commercial nuclear power plants, the different technical, site-specific and economic assumptions used make it difficult to interpret those cost estimates and compare them with that of a relevant plant. Trustworthy cost estimates are crucial to plan a safe and economic decommissioning project. The typical approach is to break down the decommissioning project into a series of discrete and measurable work activities. Although plant specific differences derived from the economic and technical assumptions make a licensee difficult to estimate reliable decommissioning costs, estimating decommissioning costs is the most crucial processes since it encompasses all the spectrum of activities from the planning to the final evaluation on whether a decommissioning project has successfully been preceded from the perspective of safety and economic points. Hence, it is clear that tenacious efforts should be needed to successfully perform the decommissioning project.

  1. Decommissioning Cost Estimating -The ''Price'' Approach

    International Nuclear Information System (INIS)

    Manning, R.; Gilmour, J.

    2002-01-01

    Over the past 9 years UKAEA has developed a formalized approach to decommissioning cost estimating. The estimating methodology and computer-based application are known collectively as the PRICE system. At the heart of the system is a database (the knowledge base) which holds resource demand data on a comprehensive range of decommissioning activities. This data is used in conjunction with project specific information (the quantities of specific components) to produce decommissioning cost estimates. PRICE is a dynamic cost-estimating tool, which can satisfy both strategic planning and project management needs. With a relatively limited analysis a basic PRICE estimate can be produced and used for the purposes of strategic planning. This same estimate can be enhanced and improved, primarily by the improvement of detail, to support sanction expenditure proposals, and also as a tender assessment and project management tool. The paper will: describe the principles of the PRICE estimating system; report on the experiences of applying the system to a wide range of projects from contaminated car parks to nuclear reactors; provide information on the performance of the system in relation to historic estimates, tender bids, and outturn costs

  2. Assessment of the possibility of increasing a load - carrying strength of truss bridges of overhead travelling cranes

    Directory of Open Access Journals (Sweden)

    Michał MUSIOŁ

    2012-01-01

    Full Text Available A possibility of increasing the load-carrying strength of truss bridges of overhead travelling cranes by transferring a part of a useful load from the main truss (which transfers directly the load originated from road wheels of the crane carriage on the parallel auxiliary truss by means of increasing rigidity of truss members joining both trusses - was presented in the paper. The verification of a static relief of the main truss by the auxiliary one as a function of rigidity of transverse and skew space trusses was performed. The A. Blum method was used in analytical calculations. The obtained results were verified by means of the ANSYS 12.1 program utilising the finite element method (FEM.

  3. A critical review of the ESCAPE project for estimating long-term health effects of air pollution.

    Science.gov (United States)

    Lipfert, Frederick W

    2017-02-01

    The European Study of Cohorts for Air Pollution Effects (ESCAPE) is a13-nation study of long-term health effects of air pollution based on subjects pooled from up to 22 cohorts that were intended for other purposes. Twenty-five papers have been published on associations of various health endpoints with long-term exposures to NOx, NO2, traffic indicators, PM10, PM2.5 and PM constituents including absorbance (elemental carbon). Seven additional ESCAPE papers found moderate correlations (R2=0.3-0.8) between measured air quality and estimates based on land-use regression that were used; personal exposures were not considered. I found no project summaries or comparisons across papers; here I conflate the 25 ESCAPE findings in the context of other recent European epidemiology studies. Because one ESCAPE cohort contributed about half of the subjects, I consider it and the other 18 cohorts separately to compare their contributions to the combined risk estimates. I emphasize PM2.5 and confirm the published hazard ratio of 1.14 (1.04-1.26) per 10μg/m3 for all-cause mortality. The ESCAPE papers found 16 statistically significant (p<0.05) risks among the125 pollutant-endpoint combinations; 4 each for PM2.5 and PM10, 1 for PM absorbance, 5 for NO2, and 2 for traffic. No PM constituent was consistently significant. No significant associations were reported for cardiovascular mortality; low birthrate was significant for all pollutants except PM absorbance. Based on associations with PM2.5, I find large differences between all-cause death estimates and the sum of specific-cause death estimates. Scatterplots of PM2.5 mortality risks by cause show no consistency across the 18 cohorts, ostensibly because of the relatively few subjects. Overall, I find the ESCAPE project inconclusive and I question whether the efforts required to estimate exposures for small cohorts were worthwhile. I suggest that detailed studies of the large cohort using historical exposures and additional

  4. High performance message passing for the ATLAS DAQ/EF-1 project

    CERN Document Server

    Mornacchi, Giuseppe

    1999-01-01

    Summary form only. A message passing library has been developed in the context of the ATLAS DAQ/EF-1 project. It is used for time critical applications within the front-end part of the DAQ system, mainly to exchange data control messages between I/O processors. Key objectives of the design were low message overheads, efficient use of the data transfer buses, provision of broadcast functionality and a hardware and operating system independent implementation of the application interface. The design and implementation of the message passing library are presented. As required by the project, the implementation is based on commercial components, namely VMEbus, PCI, the Lynx-OS real-time operating system and an additional inter- processor link, PVIC. The latter offers broadcast functionality identified as being important to the overall performance of the message passing. In addition, performance benchmarks for all implementing buses are presented for both simple test programs and the full DAQ applications. (0 refs)...

  5. The market for, and economics of, cogeneration and independent power projects in a competitive environment

    International Nuclear Information System (INIS)

    McLeese, R.

    1999-01-01

    A corporate review of Access Capital Corporation was presented. The company is a financial advisor for the development and ownership of electric power projects. The company has expertise in various technologies including gas-fired cogeneration, hydro energy, biomass, renewables and district heating. This presentation included a series of overhead viewgraphs which focused on: (1) the restructuring of Ontario's electricity market, (2) future private power requirements, (3) economics of IPP technologies, (4) pros and cons of on-site power generation, (5) rates paid for private power supply, and (6) financial restructuring of current NUG power purchase contracts. 2 tabs., 6 figs

  6. Workers exposure to electric fields in 400 kV substations and overhead line works

    International Nuclear Information System (INIS)

    Elovaara, J.; Kuisti, H.; Korpinen, L.

    2010-01-01

    The maximum exposing electric field strength magnitude in the highly inhomogeneous 400 kV electric field under work conditions can reach the value of several tens of kV/m. In spite of this the average current density is, in Finland, always lower than 10 mA/m 2 . Furthermore, the total body currents or contact currents are in 400 kV works clearly less than the limit value proposed by the EU's draft for Directive. On the basis of the obtained results it can be concluded that from the limit value point of view it is not necessary to take further actions to reduce the exposure of the workers when they are working in 400 kV substations and on 400 kV overhead lines. However, because the transient peak values of the contact current can be painful and disturb work, it is advisable to develop a safe and reliable method to connect the worker and the work object in the common ground (equipotential bonding). (authors)

  7. The Environmental Impact Assessment (EIA) for high-voltage overhead lines; Umweltvertraeglichkeitspruefung (UVP) fuer Hochspannungsfreileitungen

    Energy Technology Data Exchange (ETDEWEB)

    Klockow, S. [Landesentwicklungsgesellschaft Baden-Wuerttemberg, Stuttgart (Germany). Abt. Umwelt

    1996-11-04

    In some of the federal states of Germany the licensing of new or the laying or existing high-voltage overhead lines requires an environmental impact assessment. For many utility companies, however, environmental impact assessments for high-voltage lines are virgin territory. Experience shows that preparing the documentation is not a major problem. Questions usually arise over details such as the calculation of possible incidents or the comparison of different layouts. The authors describes general approaches and strategies and looks at specific problems. (orig.) [Deutsch] Bei der Genehmigung neuer oder der Verlegung vorhandener Hochspannungsfreileitungen ist in einigen Bundeslaendern eine Umweltvertraeglichkeitspruefung durchzufuehren. Fuer viele Energieversorgungsunternehmen ist die Erarbeitung von Umweltvertraeglichkeitsstudien fuer Hochspannungsleitungen aber noch Neuland. Praxiserfahrungen zeigen, dass die Erarbeitung der erforderlichen Unterlagen ohne groessere Schwierigkeiten moeglich ist. Fragen ergeben sich dabei aber bei speziellen Details, z.B. bei der Betrachtung von moeglichen Stoerfaellen oder beim Vergleich von Trassenvarianten. Der Verfasser skizziert das allgemeine Vorgehen und erlaeutert ausfuehrlich die Detailprobleme. (orig.)

  8. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  9. S.I. 1987 No. 2182, The Electricity Generating Stations and Overhead Lines (Inquiries Procedure) Rules 1987

    International Nuclear Information System (INIS)

    1987-01-01

    These Rules, which came into force on 14 January 1988, make new provision for the procedure for any public inquiry held pursuant to Section 34 of the Electricity Act 1957 in relation to applications for consent to construct or extend a generating station (including nuclear stations). The Rules were made pursuant to Section 11 of the Tribunals and Inquiries Act 1971. They revoke the previous Electricity Generating Stations and Overhead Line (Inquiries Procedures) Rules 1981. These new Rules cover the same topics as the previous Rules but aim to shorten the potential length and thus cost of inquiries. They will apply to the Inquiry to be held into the application by the Central Electricity Generating Board to build a pressurised water reactor at Hinkley Point in Somerset. (NEA) [fr

  10. The Meth Project and Teen Meth Use: New Estimates from the National and State Youth Risk Behavior Surveys.

    Science.gov (United States)

    Anderson, D Mark; Elsea, David

    2015-12-01

    In this note, we use data from the national and state Youth Risk Behavior Surveys for the period 1999 through 2011 to estimate the relationship between the Meth Project, an anti-methamphetamine advertising campaign, and meth use among high school students. During this period, a total of eight states adopted anti-meth advertising campaigns. After accounting for pre-existing downward trends in meth use, we find little evidence that the campaign curbed meth use in the full sample. We do find, however, some evidence that the Meth Project may have decreased meth use among White high school students. Copyright © 2014 John Wiley & Sons, Ltd.

  11. Estimation and control of droplet size and frequency in projected spray mode of a gas metal arc welding (GMAW) process.

    Science.gov (United States)

    Anzehaee, Mohammad Mousavi; Haeri, Mohammad

    2011-07-01

    New estimators are designed based on the modified force balance model to estimate the detaching droplet size, detached droplet size, and mean value of droplet detachment frequency in a gas metal arc welding process. The proper droplet size for the process to be in the projected spray transfer mode is determined based on the modified force balance model and the designed estimators. Finally, the droplet size and the melting rate are controlled using two proportional-integral (PI) controllers to achieve high weld quality by retaining the transfer mode and generating appropriate signals as inputs of the weld geometry control loop. Copyright © 2011 ISA. Published by Elsevier Ltd. All rights reserved.

  12. High Voltage Overhead Power Line Routing under an Objective Observability Criterion

    Directory of Open Access Journals (Sweden)

    L. Alfredo Fernandez-Jimenez

    2017-10-01

    Full Text Available The construction of new high voltage overhead power lines (HVOPLs has become a controversial issue for electricity companies due to social opposition. Citizens are concerned about how these power lines may have an impact on their lives, basically caused by their effects on health and safety. Visual impact is one of the most easily perceived. Although there are several published works that deal with the assessment of the visual impact produced by HVOPLs, no methodology has been proposed to assess this impact from an objective perspective. This work presents an original methodology which helps to identify the optimal routes for a new HVOPL under an objective observability criterion, enabling the selection of those with the lowest visibility in a zone. The application of the proposed methodology achieves a set of routes that links new HVOPL origin and destination points creating a corridor which includes all possible routes with an observability of its towers under a threshold limit. This methodology is illustrated by a real-life use corresponding to the selection of the route with least observability for a new power line in La Rioja (Spain. The results obtained may help to achieve a consensus between key stakeholders since it is focused on the specific issues of the planned HVOPL and its observability from an objective perspective.

  13. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  14. Planning level assessment of greenhouse gas emissions for alternative transportation construction projects : carbon footprint estimator, phase II, volume I - GASCAP model.

    Science.gov (United States)

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  15. The great environmental restoration cost estimating shootout: A blind test of three DOE cost estimating groups

    International Nuclear Information System (INIS)

    Klemen, Paul

    1992-01-01

    The cost of the Department of Energy's (DOE) Environmental Restoration (ER) Program has increased steadily over the last three years and, in the process, has drawn increasing scrutiny from Congress, the public, and government agencies such as the Office of Management and Budget and the General Accounting Office. Programmatic costs have been reviewed by many groups from within the DOE as well as from outside agencies. While cost may appear to be a universally applicable barometer of project conditions, it is actually a single dimensional manifestation of a complex set of conditions. As such, variations in cost estimates can be caused by a variety of underlying factors such as changes in scope, schedule, performing organization, economic conditions, or regulatory environment. This paper will examine the subject of cost estimates by evaluating three different cost estimates prepared for a single project including two estimates prepared by project proponents and another estimate prepared by a review team. The paper identifies the reasons for cost growth as measured by the different estimates and evaluates the ability of review estimates to measure the validity of costs. The comparative technique used to test the three cost estimates will identify the reasons for changes in the estimated cost, over time, and evaluate the ability of an independent review to correctly identify the reasons for cost growth and evaluate the reasonableness of the cost proposed by the project proponents. Recommendations are made for improved cost estimates and improved cost estimate reviews. Conclusions are reached regarding the differences in estimate results that can be attributed to differences in estimating techniques, the implications of these differences for decision makers, and circumstances that are unique to environmental cost estimating. (author)

  16. Accurate location estimation of moving object In Wireless Sensor network

    Directory of Open Access Journals (Sweden)

    Vinay Bhaskar Semwal

    2011-12-01

    Full Text Available One of the central issues in wirless sensor networks is track the location, of moving object which have overhead of saving data, an accurate estimation of the target location of object with energy constraint .We do not have any mechanism which control and maintain data .The wireless communication bandwidth is also very limited. Some field which is using this technique are flood and typhoon detection, forest fire detection, temperature and humidity and ones we have these information use these information back to a central air conditioning and ventilation.In this research paper, we propose protocol based on the prediction and adaptive based algorithm which is using less sensor node reduced by an accurate estimation of the target location. We had shown that our tracking method performs well in terms of energy saving regardless of mobility pattern of the mobile target. We extends the life time of network with less sensor node. Once a new object is detected, a mobile agent will be initiated to track the roaming path of the object.

  17. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  18. Structural health monitoring of compression connectors for overhead transmission lines

    Science.gov (United States)

    Wang, Hong; Wang, Jy-An John; Swindeman, Joseph P.; Ren, Fei; Chan, John

    2017-04-01

    Two-stage aluminum conductor steel-reinforced (ACSR) compression connectors are extensively used in US overhead transmission lines. The connectors are made by crimping a steel sleeve onto a steel core and an aluminum sleeve over electrical conducting aluminum strands. The connectors are designed to operate at temperatures up to 125°C, but their performance is increasingly degrading because of overloading of lines. Currently, electric utilities conduct routine line inspections using thermal and electrical measurements, but these methods do not provide information about the structural integrity of connectors. In this work, structural health monitoring (SHM) of compression connectors was studied using electromechanical impedance (EMI) analysis. Lead zirconate titanate (PZT)-5A was identified as a smart material for SHM. A flexible high-temperature bonding layer was used to address challenges in PZT integration due to a significant difference in the coefficients of thermal expansion of PZT and the aluminum substrate. The steel joint on the steel core was investigated because it is responsible for the ultimate tensile strength of the connector. Tensile testing was used to induce structural damage to the joint, or steel core pullout, and thermal cycling introduced additional structural perturbations. EMI measurements were conducted between the tests. The root mean square deviation (RMSD) of EMI was identified as a damage index. The use of steel joints has been shown to enable SHM under simulated conditions. The EMI signature is sensitive to variations in structural conditions. RMSD can be correlated to the structural health of a connector and has potential for use in the SHM and structural integrity evaluation.

  19. The Boston Methane Project: Mapping Surface Emissions to Inform Atmospheric Estimation of Urban Methane Flux

    Science.gov (United States)

    Phillips, N.; Crosson, E.; Down, A.; Hutyra, L.; Jackson, R. B.; McKain, K.; Rella, C.; Raciti, S. M.; Wofsy, S. C.

    2012-12-01

    Lost and unaccounted natural gas can amount to over 6% of Massachusetts' total annual greenhouse gas inventory (expressed as equivalent CO2 tonnage). An unknown portion of this loss is due to natural gas leaks in pipeline distribution systems. The objective of the Boston Methane Project is to estimate the overall leak rate from natural gas systems in metropolitan Boston, and to compare this flux with fluxes from the other primary methane emissions sources. Companion talks at this meeting describe the atmospheric measurement and modeling framework, and chemical and isotopic tracers that can partition total atmospheric methane flux into natural gas and non-natural gas components. This talk focuses on estimation of surface emissions that inform the atmospheric modeling and partitioning. These surface emissions include over 3,300 pipeline natural gas leaks in Boston. For the state of Massachusetts as a whole, the amount of natural gas reported as lost and unaccounted for by utility companies was greater than estimated landfill emissions by an order of magnitude. Moreover, these landfill emissions were overwhelmingly located outside of metro Boston, while gas leaks are concentrated in exactly the opposite pattern, increasing from suburban Boston toward the urban core. Work is in progress to estimate spatial distribution of methane emissions from wetlands and sewer systems. We conclude with a description of how these spatial data sets will be combined and represented for application in atmospheric modeling.

  20. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  1. Engineer’s estimate reliability and statistical characteristics of bids

    Directory of Open Access Journals (Sweden)

    Fariborz M. Tehrani

    2016-12-01

    Full Text Available The objective of this report is to provide a methodology for examining bids and evaluating the performance of engineer’s estimates in capturing the true cost of projects. This study reviews the cost development for transportation projects in addition to two sources of uncertainties in a cost estimate, including modeling errors and inherent variability. Sample projects are highway maintenance projects with a similar scope of the work, size, and schedule. Statistical analysis of engineering estimates and bids examines the adaptability of statistical models for sample projects. Further, the variation of engineering cost estimates from inception to implementation has been presented and discussed for selected projects. Moreover, the applicability of extreme values theory is assessed for available data. The results indicate that the performance of engineer’s estimate is best evaluated based on trimmed average of bids, excluding discordant bids.

  2. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  3. The GridPP DIRAC project - DIRAC for non-LHC communities

    CERN Document Server

    Bauer, D; Currie, R; Fayer, S; Huffman, A; Martyniak, J; Rand, D; Richards, A

    2015-01-01

    The GridPP consortium in the UK is currently testing a multi-VO DIRAC service aimed at non-LHC VOs. These VOs (Virtual Organisations) are typically small and generally do not have a dedicated computing support post. The majority of these represent particle physics experiments (e.g. NA62 and COMET), although the scope of the DIRAC service is not limited to this field. A few VOs have designed bespoke tools around the EMI-WMS & LFC, while others have so far eschewed distributed resources as they perceive the overhead for accessing them to be too high. The aim of the GridPP DIRAC project is to provide an easily adaptable toolkit for such VOs in order to lower the threshold for access to distributed resources such as Grid and cloud computing. As well as hosting a centrally run DIRAC service, we will also publish our changes and additions to the upstream DIRAC codebase under an open-source license. We report on the current status of this project and show increasing adoption of DIRAC within the non-LHC communiti...

  4. The GridPP DIRAC project - DIRAC for non-LHC communities

    Science.gov (United States)

    Bauer, D.; Colling, D.; Currie, R.; Fayer, S.; Huffman, A.; Martyniak, J.; Rand, D.; Richards, A.

    2015-12-01

    The GridPP consortium in the UK is currently testing a multi-VO DIRAC service aimed at non-LHC VOs. These VOs (Virtual Organisations) are typically small and generally do not have a dedicated computing support post. The majority of these represent particle physics experiments (e.g. NA62 and COMET), although the scope of the DIRAC service is not limited to this field. A few VOs have designed bespoke tools around the EMI-WMS & LFC, while others have so far eschewed distributed resources as they perceive the overhead for accessing them to be too high. The aim of the GridPP DIRAC project is to provide an easily adaptable toolkit for such VOs in order to lower the threshold for access to distributed resources such as Grid and cloud computing. As well as hosting a centrally run DIRAC service, we will also publish our changes and additions to the upstream DIRAC codebase under an open-source license. We report on the current status of this project and show increasing adoption of DIRAC within the non-LHC communities.

  5. Quantitative estimation of brain atrophy and function with PET and MRI two-dimensional projection images

    International Nuclear Information System (INIS)

    Saito, Reiko; Uemura, Koji; Uchiyama, Akihiko; Toyama, Hinako; Ishii, Kenji; Senda, Michio

    2001-01-01

    The purpose of this paper is to estimate the extent of atrophy and the decline in brain function objectively and quantitatively. Two-dimensional (2D) projection images of three-dimensional (3D) transaxial images of positron emission tomography (PET) and magnetic resonance imaging (MRI) were made by means of the Mollweide method which keeps the area of the brain surface. A correlation image was generated between 2D projection images of MRI and cerebral blood flow (CBF) or 18 F-fluorodeoxyglucose (FDG) PET images and the sulcus was extracted from the correlation image clustered by K-means method. Furthermore, the extent of atrophy was evaluated from the extracted sulcus on 2D-projection MRI and the cerebral cortical function such as blood flow or glucose metabolic rate was assessed in the cortex excluding sulcus on 2D-projection PET image, and then the relationship between the cerebral atrophy and function was evaluated. This method was applied to the two groups, the young and the aged normal subjects, and the relationship between the age and the rate of atrophy or the cerebral blood flow was investigated. This method was also applied to FDG-PET and MRI studies in the normal controls and in patients with corticobasal degeneration. The mean rate of atrophy in the aged group was found to be higher than that in the young. The mean value and the variance of the cerebral blood flow for the young are greater than those of the aged. The sulci were similarly extracted using either CBF or FDG PET images. The purposed method using 2-D projection images of MRI and PET is clinically useful for quantitative assessment of atrophic change and functional disorder of cerebral cortex. (author)

  6. Department of the Navy. FY 1994/FY 1995 Biennial Budget Estimates. Military Construction Program. FY 1994

    Science.gov (United States)

    1992-01-01

    CONTRACT COST ..... ................ - - - 2,920 SUPERVISION. INSPECTION & OVERHEAD ( 6.0%) . - - - ISO TOTAL REQUEST. ................. - - - 3.100...3,570CONTINGENCY ( 5.0%) . . . . . . . . . . . ISO TOTAL CONTRACT COST . .. .. .. .. .. . .. - - - 3.700 SUPERVISION. INSPECTION & OVERHEAD ( 6.0%) . - - - 220...CONTINUED) b. Renovation/Modernization: Building 27001 is an Air Force excess and substandard facility that was vacated when the Air Force B-52 Bomber

  7. Calculation of electrical and magnetic field in electric power transmission lines aiming project optimization, environmental impact and alternatives comparisons; O calculo dos campos eletrico e magnetico de L.T. visando a otimizacao do projeto, o impacto ambiental e a comparacao de alternativas

    Energy Technology Data Exchange (ETDEWEB)

    Portela, Carlos M. [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE); Moreno O, German [Antioquia Univ., Medellin (Colombia). Dept. de Engenharia Eletrica

    1995-12-31

    The optimization of overhead electric power transmission lines leads to compact projects in which the neighbourhood electric and magnetic field are a critical restriction. The Load Simulation Method enables the reliable calculation of such fields. Presented are equations for the application of such conditions. Results are presented 9 figs., 2 tabs., 10 refs.

  8. Estimation of expenses for low and intermediate level radioactive waste repository project in Croatia up to site license acquisition

    International Nuclear Information System (INIS)

    Schaller, A.; Lokner, V.; Subasic, D.

    2003-01-01

    The expenses needed for development of low- and intermediate level radioactive waste (LILW) repository project in Croatia include: (a) preliminary activities, (b) preparatory activities, and (c) preparing of environmental impact study. The first group of expenses are referring to the project leading activities, project plan updating, build-up of required infrastructure, preparing of licensing documentation, site investigations, data acquisition programme, pre-operational radio-ecological monitoring, modelling, safety analysis (first iteration) and public related activities. Preparatory activities are referring to purchasing of land for repository and preparatory activities for carrying out of on-site investigations, while third group of expenses are related to preparation and validation of Environmental impact study. It was found out that about 50 % of total expenses refer to build-up of infrastructure. Additional 25 % finances are related to radio-ecological monitoring, site investigations and development of calculations and models, while remaining 25 % of total estimated sum is expected to be spent for repository safety assessment, public relations, purchasing and preparing the on-site terrain for construction, etc. It was calculated 607 EUR per m3 of LILW to be needed up to site license acquisition. According to the world-wide practice, by extrapolating of additional expenses necessary for construction of the repository and acquisition of operational license, it comes out the cost of 1.723 EUR per m3 of LILW for shallow-ground and 2.412 EUR per m3 of LILW for tunnel repository. The estimated expenses for Croatia are within the span of expenses for the same purpose in the countries considered. Expected duration of the project performance up to acquisition of the site license is 4 years and 3 months. (author)

  9. Fast estimation of defect profiles from the magnetic flux leakage signal based on a multi-power affine projection algorithm.

    Science.gov (United States)

    Han, Wenhua; Shen, Xiaohui; Xu, Jun; Wang, Ping; Tian, Guiyun; Wu, Zhengyang

    2014-09-04

    Magnetic flux leakage (MFL) inspection is one of the most important and sensitive nondestructive testing approaches. For online MFL inspection of a long-range railway track or oil pipeline, a fast and effective defect profile estimating method based on a multi-power affine projection algorithm (MAPA) is proposed, where the depth of a sampling point is related with not only the MFL signals before it, but also the ones after it, and all of the sampling points related to one point appear as serials or multi-power. Defect profile estimation has two steps: regulating a weight vector in an MAPA filter and estimating a defect profile with the MAPA filter. Both simulation and experimental data are used to test the performance of the proposed method. The results demonstrate that the proposed method exhibits high speed while maintaining the estimated profiles clearly close to the desired ones in a noisy environment, thereby meeting the demand of accurate online inspection.

  10. Climate Projections and Uncertainty Communication.

    Science.gov (United States)

    Joslyn, Susan L; LeClerc, Jared E

    2016-01-01

    Lingering skepticism about climate change might be due in part to the way climate projections are perceived by members of the public. Variability between scientists' estimates might give the impression that scientists disagree about the fact of climate change rather than about details concerning the extent or timing. Providing uncertainty estimates might clarify that the variability is due in part to quantifiable uncertainty inherent in the prediction process, thereby increasing people's trust in climate projections. This hypothesis was tested in two experiments. Results suggest that including uncertainty estimates along with climate projections leads to an increase in participants' trust in the information. Analyses explored the roles of time, place, demographic differences (e.g., age, gender, education level, political party affiliation), and initial belief in climate change. Implications are discussed in terms of the potential benefit of adding uncertainty estimates to public climate projections. Copyright © 2015 Cognitive Science Society, Inc.

  11. Gas-cooled fast-breeder reactor. Helium Circulator Test Facility updated design cost estimate

    International Nuclear Information System (INIS)

    1979-04-01

    Costs which are included in the cost estimate are: Titles I, II, and III Architect-Engineering Services; Titles I, II, and III General Atomic Services; site clearing, grading, and excavation; bulk materials and labor of installation; mechanical and electrical equipment with installation; allowance for contractors' overhead, profit, and insurance; escalation on materials and labor; a contingency; and installation of GAC supplied equipment and materials. The total estimated cost of the facility in As Spent Dollars is $27,700,000. Also included is a cost comparison of the updated design and the previous conceptual design. There would be a considerable penalty for the direct-cooled system over the indirect-cooled system due to the excessive cost of the large diameter helium loop piping to an outdoor heat exchanger. The indirect cooled system which utilizes a helium/Dowtherm G heat exchanger and correspondingly smaller and lower pressure piping to its outdoor air cooler proved to be the more economical of the two systems

  12. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  13. Improving the Performance of CPU Architectures by Reducing the Operating System Overhead (Extended Version

    Directory of Open Access Journals (Sweden)

    Zagan Ionel

    2016-07-01

    Full Text Available The predictable CPU architectures that run hard real-time tasks must be executed with isolation in order to provide a timing-analyzable execution for real-time systems. The major problems for real-time operating systems are determined by an excessive jitter, introduced mainly through task switching. This can alter deadline requirements, and, consequently, the predictability of hard real-time tasks. New requirements also arise for a real-time operating system used in mixed-criticality systems, when the executions of hard real-time applications require timing predictability. The present article discusses several solutions to improve the performance of CPU architectures and eventually overcome the Operating Systems overhead inconveniences. This paper focuses on the innovative CPU implementation named nMPRA-MT, designed for small real-time applications. This implementation uses the replication and remapping techniques for the program counter, general purpose registers and pipeline registers, enabling multiple threads to share a single pipeline assembly line. In order to increase predictability, the proposed architecture partially removes the hazard situation at the expense of larger execution latency per one instruction.

  14. Estimating Drilling Cost and Duration Using Copulas Dependencies Models

    Directory of Open Access Journals (Sweden)

    M. Al Kindi

    2017-03-01

    Full Text Available Estimation of drilling budget and duration is a high-level challenge for oil and gas industry. This is due to the many uncertain activities in the drilling procedure such as material prices, overhead cost, inflation, oil prices, well type, and depth of drilling. Therefore, it is essential to consider all these uncertain variables and the nature of relationships between them. This eventually leads into the minimization of the level of uncertainty and yet makes a "good" estimation points for budget and duration given the well type. In this paper, the copula probability theory is used in order to model the dependencies between cost/duration and MRI (mechanical risk index. The MRI is a mathematical computation, which relates various drilling factors such as: water depth, measured depth, true vertical depth in addition to mud weight and horizontal displacement. In general, the value of MRI is utilized as an input for the drilling cost and duration estimations. Therefore, modeling the uncertain dependencies between MRI and both cost and duration using copulas is important. The cost and duration estimates for each well were extracted from the copula dependency model where research study simulate over 10,000 scenarios. These new estimates were later compared to the actual data in order to validate the performance of the procedure. Most of the wells show moderate - weak relationship of MRI dependence, which means that the variation in these wells can be related to MRI but to the extent that it is not the primary source.

  15. Channel Equalization and Phase Estimation for Reduced-Guard-Interval CO-OFDM Systems

    Science.gov (United States)

    Zhuge, Qunbi

    Reduced-guard-interval (RGI) coherent optical (CO) orthogonal frequency-division multiplexing (OFDM) is a potential candidate for next generation 100G beyond optical transports, attributed to its advantages such as high spectral efficiency and high tolerance to optical channel impairments. First of all, we review the coherent optical systems with an emphasis on CO-OFDM systems as well as the optical channel impairments and the general digital signal processing techniques to combat them. This work focuses on the channel equalization and phase estimation of RGI CO-OFDM systems. We first propose a novel equalization scheme based on the equalization structure of RGI CO-OFDM to reduce the cyclic prefix overhead to zero. Then we show that intra-channel nonlinearities should be considered when designing the training symbols for channel estimation. Afterwards, we propose and analyze the phenomenon of dispersion-enhanced phase noise (DEPN) caused by the interaction between the laser phase noise and the chromatic dispersion in RGI CO-OFDM transmissions. DEPN induces a non-negligible performance degradation and limits the tolerant laser linewidth. However, it can be compensated by the grouped maximum-likelihood phase estimation proposed in this work.

  16. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  17. Transmission line undergrounding : rate impact investigation and analysis

    International Nuclear Information System (INIS)

    2004-01-01

    In response to concerns expressed by the residents of Markham, Ontario regarding the possible environmental and health impacts of a proposed 230 kV overhead transmission line, Hydro One Networks Inc. (HONI) has proposed to place the line underground as an alternative. This analysis was prepared to evaluate the potential impacts on transmission rates and consumer prices related to changes in the level of underground construction of transmission lines by HONI, as opposed to overhead construction. The report presents the approach to data collection; cost estimates and projections; the modeling and projecting of HONI's regulated rate base and revenue requirement on a basis that reflects the manner in which its future transmission rates are expected to be established; estimates of the incremental cost of undergrounding reflecting a range of reasonable assumptions; and a comparison of the resulting transmission costs and total customer bill. To address the issue of potential demand in other municipalities for additional undergrounding, the study also examined the cumulative effects of ten years' incremental undergrounding costs (i.e. effects on 2014 rates). It was concluded that if HONI were to implement an undergrounding program beginning in 2005, resulting in the installation of 80 km of underground lines by 2014, and shared costs by all users of HONI's system through the network transmission charges, the 2014 transmission rates would be higher. 5 tabs

  18. Machine-Learning Based Channel Quality and Stability Estimation for Stream-Based Multichannel Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Waqas Rehan

    2016-09-01

    Full Text Available Wireless sensor networks (WSNs have become more and more diversified and are today able to also support high data rate applications, such as multimedia. In this case, per-packet channel handshaking/switching may result in inducing additional overheads, such as energy consumption, delays and, therefore, data loss. One of the solutions is to perform stream-based channel allocation where channel handshaking is performed once before transmitting the whole data stream. Deciding stream-based channel allocation is more critical in case of multichannel WSNs where channels of different quality/stability are available and the wish for high performance requires sensor nodes to switch to the best among the available channels. In this work, we will focus on devising mechanisms that perform channel quality/stability estimation in order to improve the accommodation of stream-based communication in multichannel wireless sensor networks. For performing channel quality assessment, we have formulated a composite metric, which we call channel rank measurement (CRM, that can demarcate channels into good, intermediate and bad quality on the basis of the standard deviation of the received signal strength indicator (RSSI and the average of the link quality indicator (LQI of the received packets. CRM is then used to generate a data set for training a supervised machine learning-based algorithm (which we call Normal Equation based Channel quality prediction (NEC algorithm in such a way that it may perform instantaneous channel rank estimation of any channel. Subsequently, two robust extensions of the NEC algorithm are proposed (which we call Normal Equation based Weighted Moving Average Channel quality prediction (NEWMAC algorithm and Normal Equation based Aggregate Maturity Criteria with Beta Tracking based Channel weight prediction (NEAMCBTC algorithm, that can perform channel quality estimation on the basis of both current and past values of channel rank estimation

  19. Machine-Learning Based Channel Quality and Stability Estimation for Stream-Based Multichannel Wireless Sensor Networks.

    Science.gov (United States)

    Rehan, Waqas; Fischer, Stefan; Rehan, Maaz

    2016-09-12

    Wireless sensor networks (WSNs) have become more and more diversified and are today able to also support high data rate applications, such as multimedia. In this case, per-packet channel handshaking/switching may result in inducing additional overheads, such as energy consumption, delays and, therefore, data loss. One of the solutions is to perform stream-based channel allocation where channel handshaking is performed once before transmitting the whole data stream. Deciding stream-based channel allocation is more critical in case of multichannel WSNs where channels of different quality/stability are available and the wish for high performance requires sensor nodes to switch to the best among the available channels. In this work, we will focus on devising mechanisms that perform channel quality/stability estimation in order to improve the accommodation of stream-based communication in multichannel wireless sensor networks. For performing channel quality assessment, we have formulated a composite metric, which we call channel rank measurement (CRM), that can demarcate channels into good, intermediate and bad quality on the basis of the standard deviation of the received signal strength indicator (RSSI) and the average of the link quality indicator (LQI) of the received packets. CRM is then used to generate a data set for training a supervised machine learning-based algorithm (which we call Normal Equation based Channel quality prediction (NEC) algorithm) in such a way that it may perform instantaneous channel rank estimation of any channel. Subsequently, two robust extensions of the NEC algorithm are proposed (which we call Normal Equation based Weighted Moving Average Channel quality prediction (NEWMAC) algorithm and Normal Equation based Aggregate Maturity Criteria with Beta Tracking based Channel weight prediction (NEAMCBTC) algorithm), that can perform channel quality estimation on the basis of both current and past values of channel rank estimation. In the end

  20. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  1. Estimating Gender Wage Gaps

    Science.gov (United States)

    McDonald, Judith A.; Thornton, Robert J.

    2011-01-01

    Course research projects that use easy-to-access real-world data and that generate findings with which undergraduate students can readily identify are hard to find. The authors describe a project that requires students to estimate the current female-male earnings gap for new college graduates. The project also enables students to see to what…

  2. Preliminary methodological proposal for estimating environmental flows in projects approved by the ministry of environment and sustainable development (MADS), Colombia

    International Nuclear Information System (INIS)

    Pinilla Agudelo, Gabriel A; Rodriguez Sandoval, Erasmo A; Camacho Botero, Luis A

    2014-01-01

    A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA) in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogota (UNC). The proposed method begins with an evaluation of hydrological criteria, continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macro invertebrates, riparian vegetation, and fish). The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS.

  3. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  4. Global mortality estimates for the 2009 Influenza Pandemic from the GLaMOR project: a modeling study.

    Science.gov (United States)

    Simonsen, Lone; Spreeuwenberg, Peter; Lustig, Roger; Taylor, Robert J; Fleming, Douglas M; Kroneman, Madelon; Van Kerkhove, Maria D; Mounts, Anthony W; Paget, W John

    2013-11-01

    Assessing the mortality impact of the 2009 influenza A H1N1 virus (H1N1pdm09) is essential for optimizing public health responses to future pandemics. The World Health Organization reported 18,631 laboratory-confirmed pandemic deaths, but the total pandemic mortality burden was substantially higher. We estimated the 2009 pandemic mortality burden through statistical modeling of mortality data from multiple countries. We obtained weekly virology and underlying cause-of-death mortality time series for 2005-2009 for 20 countries covering ∼35% of the world population. We applied a multivariate linear regression model to estimate pandemic respiratory mortality in each collaborating country. We then used these results plus ten country indicators in a multiple imputation model to project the mortality burden in all world countries. Between 123,000 and 203,000 pandemic respiratory deaths were estimated globally for the last 9 mo of 2009. The majority (62%-85%) were attributed to persons under 65 y of age. We observed a striking regional heterogeneity, with almost 20-fold higher mortality in some countries in the Americas than in Europe. The model attributed 148,000-249,000 respiratory deaths to influenza in an average pre-pandemic season, with only 19% in persons representation of low-income countries among single-country estimates and an inability to study subsequent pandemic waves (2010-2012). We estimate that 2009 global pandemic respiratory mortality was ∼10-fold higher than the World Health Organization's laboratory-confirmed mortality count. Although the pandemic mortality estimate was similar in magnitude to that of seasonal influenza, a marked shift toward mortality among persons Europe. A collaborative network to collect and analyze mortality and hospitalization surveillance data is needed to rapidly establish the severity of future pandemics. Please see later in the article for the Editors' Summary.

  5. Abbreviated report of the critical analysis of the spent nuclear fuel project's activity-based cost estimate

    International Nuclear Information System (INIS)

    Warren, R.N.

    1998-01-01

    In 1997, the SNFP developed a baseline change request (BCR) and submitted it to DOE-RL for approval. The schedule was formally evaluated to have a 19% probability of success [Williams, 1998]. In December 1997, DOE-RL Manager John Wagoner approved the BCR contingent upon a subsequent independent review of the new baseline. The SNFP took several actions during the first quarter of 1998 to prepare for the independent review. The project developed the Estimating Requirements and Implementation Guide [DESH, 1998] and trained cost account managers (CAMS) and other personnel involved in the estimating process in activity-based cost (ABC) estimating techniques. The SNFP then applied ABC estimating techniques to develop the basis for the December Baseline (DB) and documented that basis in Basis of Estimate (BOE) books. These BOEs were provided to DOE in April 1998. DOE commissioned Professional Analysis, Inc. (PAI) to perform a critical analysis (CA) of the DB. PAI's review formally began on April 13. PAI performed the CA, provided three sets of findings to the SNFP contractor, and initiated reconciliation meetings. During the course of PAI's review, DOE directed the SNFP to develop a new baseline with a higher probability of success. The contractor transmitted the new baseline, which is referred to as the High Probability Baseline (HPB), to DOE on April 15, 1998 [Williams, 1998]. The HPB was estimated to approach a 90% confidence level on the start of fuel movement [Williams, 1998]. This high probability resulted in an increased cost and a schedule extension. To implement the new baseline, the contractor initiated 26 BCRs with supporting BOES. PAI's scope was revised on April 28 to add reviewing the HPB and the associated BCRs and BOES

  6. Cost estimation tools in Germany and the UK. Comparison of cost estimates and actual costs

    International Nuclear Information System (INIS)

    Pfeifer, W.; Gordelier, S.; Drake, V.

    2005-01-01

    Full text: Accurate cost estimation for future decommissioning projects is a matter of considerable importance, especially for ensuring that sufficient funds will be available at the time of project implementation. This paper looks at the experience of cost estimation and real implementation outcomes from two countries, Germany and the UK, and draws lessons for the future. In Germany, cost estimates for the decommissioning of power reactors are updated every two years. For this purpose, the STILLKO program of the NIS Company is used. So far, Forschungszentrum Karlsruhe has successfully decommissioned two prototype reactor facilities. Re-cultivation of the premises has already been completed. At the moment, the activated components of the multi-purpose research reactor (MZFR), the first pressurized water reactor in Germany that was moderated and cooled with heavy water, and of the prototype fast breeder reactor (KNK) are being dismantled remotely. Consequently, vast experience exists in particular for the updating of total costs on the basis of actually incurred expenses. The further the dismantling work proceeds, the more reliable is the total cost estimate. Here, the development of the estimated MZFR decommissioning costs shall be presented and compared with the estimates obtained for a German reference PWR-type power reactor of 1200 MW. In this way: - common features of the prototype reactor and power reactor shall be emphasized, - several parameters leading to an increase in the estimated costs shall be highlighted, - cost risks shall be outlined with the remote dismantling of the reactor pressure vessel serving as an example, - calculation parameters shall be presented, and - recommendations shall be made for a consistent estimation of costs. The United Kingdom Atomic Energy Authority (UKAEA) has a major programme for the environmental remediation of its former research and development sites at Dounreay, Windscale, Harwell and Winfrith together with the need to

  7. Evaluation of alternative model-data fusion approaches in water balance estimation across Australia

    Science.gov (United States)

    van Dijk, A. I. J. M.; Renzullo, L. J.

    2009-04-01

    Australia's national agencies are developing a continental modelling system to provide a range of water information services. It will include rolling water balance estimation to underpin national water accounts, water resources assessments that interpret current water resources availability and trends in a historical context, and water resources predictions coupled to climate and weather forecasting. The nation-wide coverage, currency, accuracy, and consistency required means that remote sensing will need to play an important role along with in-situ observations. Different approaches to blending models and observations can be considered. Integration of on-ground and remote sensing data into land surface models in atmospheric applications often involves state updating through model-data assimilation techniques. By comparison, retrospective water balance estimation and hydrological scenario modelling to date has mostly relied on static parameter fitting against observations and has made little use of earth observation. The model-data fusion approach most appropriate for a continental water balance estimation system will need to consider the trade-off between computational overhead and the accuracy gains achieved when using more sophisticated synthesis techniques and additional observations. This trade-off was investigated using a landscape hydrological model and satellite-based estimates of soil moisture and vegetation properties for aseveral gauged test catchments in southeast Australia.

  8. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  9. Management of Globally Distributed Software Development Projects in Multiple-Vendor Constellations

    Science.gov (United States)

    Schott, Katharina; Beck, Roman; Gregory, Robert Wayne

    Global information systems development outsourcing is an apparent trend that is expected to continue in the foreseeable future. Thereby, IS-related services are not only increasingly provided from different geographical sites simultaneously but beyond that from multiple service providers based in different countries. The purpose of this paper is to understand how the involvement of multiple service providers affects the management of the globally distributed information systems development projects. As research on this topic is scarce, we applied an exploratory in-depth single-case study design as research approach. The case we analyzed comprises a global software development outsourcing project initiated by a German bank together with several globally distributed vendors. For data collection and data analysis we have adopted techniques suggested by the grounded theory method. Whereas the extant literature points out the increased management overhead associated with multi-sourcing, the analysis of our case suggests that the required effort for managing global outsourcing projects with multiple vendors depends among other things on the maturation level of the cooperation within the vendor portfolio. Furthermore, our data indicate that this interplay maturity is positively impacted through knowledge about the client that has been derived based on already existing client-vendor relationships. The paper concludes by offering theoretical and practical implications.

  10. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  11. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  12. ESTIMATION OF SURVIVAL IN PATIENTS WITH ADVANCED OVARIAN CANCER – ABSTRACT OF THE RESEARCH PROJECT

    Directory of Open Access Journals (Sweden)

    Špela Smrkolj

    2018-02-01

    Full Text Available Background: Morbidity and mortality caused by cancer persist to be an important health problem world- wide and in the European Union member states as well. In Slovenia, most ovarian cancer cases are detected in advanced stages, hence a rather high mortality rate. Aims: The purpose of this research project is to analyze the primary cytoreduction in the patients with advanced ovarian cancer. The main objective of the project is to assess the use of lap- aroscopy in the prediction of optimal cytoreduction in these patients. Applicative research projectEstimation of survial in patients with advanced ovarian can- cer based on primary laparoscopical assessment of optimal cytoreduction’ (L3-2371 was approved and has been financed by the Slovene Research Agency and co-financed by the Ministry of Health of RS; Duration: May 1, 2009–April 30, 2012. Methods: The research project will consist of retrospective and prospective study. In all the patients with advanced ovarian cancer managed at the Department of Obstetrics and Gynecol- ogy, University Medical Centre Ljubljana in the years 2003–2008, and in whom optimal primary cytoreduction was made using either laparoscopy or laparotomy, certain clinical and pathomorphological factors will be compared, and the effects of all analyzed factors on the outcome of treatment assessed. In the prospective study, we will aim at assessing the use of laparoscopy in the prediction of optimal cytoreduction in all newly detected cases using a laparoscopy-based score (Fagotti’s scoring system. Conclusions: The standard management of advanced ovarian cancer patients consists of primary surgical optimal and/or suboptimal cytoreduction followed by aggressive cytotoxic chemotherapy. In line with our experience and with that published most recently, laparoscopy seems to be a promising method with which we will attempt to most accurately assess the optimal cytoreduction in surgical treatment of ovarian cancer patients.

  13. Rollback recovery with low overhead for fault tolerance in mobile ad hoc networks

    Directory of Open Access Journals (Sweden)

    Parmeet Kaur Jaggi

    2015-10-01

    Full Text Available Mobile ad hoc networks (MANETs have significantly enhanced the wireless networks by eliminating the need for any fixed infrastructure. Hence, these are increasingly being used for expanding the computing capacity of existing networks or for implementation of autonomous mobile computing Grids. However, the fragile nature of MANETs makes the constituent nodes susceptible to failures and the computing potential of these networks can be utilized only if they are fault tolerant. The technique of checkpointing based rollback recovery has been used effectively for fault tolerance in static and cellular mobile systems; yet, the implementation of existing protocols for MANETs is not straightforward. The paper presents a novel rollback recovery protocol for handling the failures of mobile nodes in a MANET using checkpointing and sender based message logging. The proposed protocol utilizes the routing protocol existing in the network for implementing a low overhead recovery mechanism. The presented recovery procedure at a node is completely domino-free and asynchronous. The protocol is resilient to the dynamic characteristics of the MANET; allowing a distributed application to be executed independently without access to any wired Grid or cellular network access points. We also present an algorithm to record a consistent global snapshot of the MANET.

  14. Comparing CMIP-3 and CMIP-5 climate projections on flooding estimation of Devils Lake of North Dakota, USA

    Directory of Open Access Journals (Sweden)

    Gehendra Kharel

    2018-04-01

    Full Text Available Background Water level fluctuations in endorheic lakes are highly susceptible to even slight changes in climate and land use. Devils Lake (DL in North Dakota, USA is an endorheic system that has undergone multi-decade flooding driven by changes in regional climate. Flooding mitigation strategies have centered on the release of lake water to a nearby river system through artificial outlets, resulting in legal challenges and environmental concerns related to water quality, downstream flooding, species migration, stakeholder opposition, and transboundary water conflicts between the US and Canada. Despite these drawbacks, running outlets would result in low overspill risks in the next 30 years. Methods In this study we evaluated the efficacy of this outlet-based mitigation strategy under scenarios based on the latest IPCC future climate projections. We used the Coupled Model Intercomparison Project CMIP-5 weather patterns from 17 general circulation models (GCMs obtained under four representative concentration pathways (RCP scenarios and downscaled to the DL region. Then, we simulated the changes in lake water levels using the soil and water assessment tool based hydrological model of the watershed. We estimated the probability of future flood risks under those scenarios and compared those with previously estimated overspill risks under the CMIP-3 climate. Results The CMIP-5 ensemble projected a mean annual temperature of 5.78 °C and mean daily precipitation of 1.42 mm/day; both are higher than the existing CMIP-3 future estimates of 4.98 °C and 1.40 mm/day, respectively. The increased precipitation and higher temperature resulted in a significant increase of DL’s overspill risks: 24.4–47.1% without release from outlets and 3.5–14.4% even if the outlets are operated at their combined full 17 m3/s capacity. Discussion The modeled increases in overspill risks indicate a greater frequency of water releases through the artificial outlets. Future

  15. Vectorization of KENO IV code and an estimate of vector-parallel processing

    International Nuclear Information System (INIS)

    Asai, Kiyoshi; Higuchi, Kenji; Katakura, Jun-ichi; Kurita, Yutaka.

    1986-10-01

    The multi-group criticality safety code KENO IV has been vectorized and tested on FACOM VP-100 vector processor. At first the vectorized KENO IV on a scalar processor became slower than the original one by a factor of 1.4 because of the overhead introduced by the vectorization. Making modifications of algorithms and techniques for vectorization, the vectorized version has become faster than the original one by a factor of 1.4 and 3.0 on the vector processor for sample problems of complex and simple geometries, respectively. For further speedup of the code, some improvements on compiler and hardware, especially on addition of Monte Carlo pipelines to the vector processor, are discussed. Finally a pipelined parallel processor system is proposed and its performance is estimated. (author)

  16. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  17. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  18. Design of an overhead crane for the ITER NB cell remote handling maintenance operations

    Energy Technology Data Exchange (ETDEWEB)

    Taubmann, Gonzalo; Brochet, Laurent [IBERTEF A.I.E., Iberica de Tecnologia de Fusion, C/Magallanes 3, 28015 Madrid (Spain); Liniers, Macarena [Asociacion EURATOM-CIEMAT para la Fusion, Av. Complutense 22, 28040 Madrid (Spain)], E-mail: macarena.liniers@ciemat.es; Medrano, Mercedes; Sarasola, Xabier; Botija, Jose; Alonso, Javier [Asociacion EURATOM-CIEMAT para la Fusion, Av. Complutense 22, 28040 Madrid (Spain); Damiani, Carlo [FUSION FOR ENERGY, Josep Pla 2, Torres Diagonal Litoral Ed B3, 08019 Barcelona (Spain)

    2009-06-15

    In the neutral beam cell of ITER all the maintenance operations on the neutral beam components (BLC's) must be performed by an overhead crane of large payload capability (30-50 tonnes). A crane system is presented consisting of a monorail, a carriage, and a lifting mechanism. The monorail must give access to the BLC's in the beam line vessel, the front components connecting the NB vessel with the Tokamak, and a storage area at the north end of the NB cell. Rail switching points are required at the intersections between radial and toroidal branches. A translational switching mechanism is proposed. The crane carriage consists of two independent sub-carriages, each composed of four wheels. A set of four secondary wheels attached to the main carriage prevents the crane tilting due to the CoG misalignment of some loads. The elevation system proposed consists of an electromechanical crane of four independent drums and 50 tonnes payload. In parallel with the crane design, a logistics and space availability study has been carried out, leading to the detection of clearance or transport problems that could be taken into account in the final crane design.

  19. Design of an overhead crane for the ITER NB cell remote handling maintenance operations

    International Nuclear Information System (INIS)

    Taubmann, Gonzalo; Brochet, Laurent; Liniers, Macarena; Medrano, Mercedes; Sarasola, Xabier; Botija, Jose; Alonso, Javier; Damiani, Carlo

    2009-01-01

    In the neutral beam cell of ITER all the maintenance operations on the neutral beam components (BLC's) must be performed by an overhead crane of large payload capability (30-50 tonnes). A crane system is presented consisting of a monorail, a carriage, and a lifting mechanism. The monorail must give access to the BLC's in the beam line vessel, the front components connecting the NB vessel with the Tokamak, and a storage area at the north end of the NB cell. Rail switching points are required at the intersections between radial and toroidal branches. A translational switching mechanism is proposed. The crane carriage consists of two independent sub-carriages, each composed of four wheels. A set of four secondary wheels attached to the main carriage prevents the crane tilting due to the CoG misalignment of some loads. The elevation system proposed consists of an electromechanical crane of four independent drums and 50 tonnes payload. In parallel with the crane design, a logistics and space availability study has been carried out, leading to the detection of clearance or transport problems that could be taken into account in the final crane design.

  20. Quantifying IT estimation risks

    NARCIS (Netherlands)

    Kulk, G.P.; Peters, R.J.; Verhoef, C.

    2009-01-01

    A statistical method is proposed for quantifying the impact of factors that influence the quality of the estimation of costs for IT-enabled business projects. We call these factors risk drivers as they influence the risk of the misestimation of project costs. The method can effortlessly be

  1. Uncertain Context Factors in ERP Project Estimation are an Asset: Insights from a Semi-Replication Case Study in a Financial Services Firm

    NARCIS (Netherlands)

    Daneva, Maia

    This paper reports on the findings of a case study in a company in the financial services sector in which we replicated the use of a previously published approach to systematically balance the contextual uncertainties in the estimation of Enterprise Resource Planning (ERP) projects. The approach is

  2. An interprojection sensor fusion approach to estimate blocked projection signal in synchronized moving grid-based CBCT system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Hong; Kong, Vic [Department of Radiation Oncology, Georgia Regents University, Augusta, Georgia 30912 (United States); Ren, Lei; Giles, William; Zhang, You [Department of Radiation Oncology, Duke University, Durham, North Carolina 27710 (United States); Jin, Jian-Yue, E-mail: jjin@gru.edu [Department of Radiation Oncology, Georgia Regents University, Augusta, Georgia 30912 and Department of Radiology, Georgia Regents University, Augusta, Georgia 30912 (United States)

    2016-01-15

    Purpose: A preobject grid can reduce and correct scatter in cone beam computed tomography (CBCT). However, half of the signal in each projection is blocked by the grid. A synchronized moving grid (SMOG) has been proposed to acquire two complimentary projections at each gantry position and merge them into one complete projection. That approach, however, suffers from increased scanning time and the technical difficulty of accurately merging the two projections per gantry angle. Herein, the authors present a new SMOG approach which acquires a single projection per gantry angle, with complimentary grid patterns for any two adjacent projections, and use an interprojection sensor fusion (IPSF) technique to estimate the blocked signal in each projection. The method may have the additional benefit of reduced imaging dose due to the grid blocking half of the incident radiation. Methods: The IPSF considers multiple paired observations from two adjacent gantry angles as approximations of the blocked signal and uses a weighted least square regression of these observations to finally determine the blocked signal. The method was first tested with a simulated SMOG on a head phantom. The signal to noise ratio (SNR), which represents the difference of the recovered CBCT image to the original image without the SMOG, was used to evaluate the ability of the IPSF in recovering the missing signal. The IPSF approach was then tested using a Catphan phantom on a prototype SMOG assembly installed in a bench top CBCT system. Results: In the simulated SMOG experiment, the SNRs were increased from 15.1 and 12.7 dB to 35.6 and 28.9 dB comparing with a conventional interpolation method (inpainting method) for a projection and the reconstructed 3D image, respectively, suggesting that IPSF successfully recovered most of blocked signal. In the prototype SMOG experiment, the authors have successfully reconstructed a CBCT image using the IPSF-SMOG approach. The detailed geometric features in the

  3. An interprojection sensor fusion approach to estimate blocked projection signal in synchronized moving grid-based CBCT system

    International Nuclear Information System (INIS)

    Zhang, Hong; Kong, Vic; Ren, Lei; Giles, William; Zhang, You; Jin, Jian-Yue

    2016-01-01

    Purpose: A preobject grid can reduce and correct scatter in cone beam computed tomography (CBCT). However, half of the signal in each projection is blocked by the grid. A synchronized moving grid (SMOG) has been proposed to acquire two complimentary projections at each gantry position and merge them into one complete projection. That approach, however, suffers from increased scanning time and the technical difficulty of accurately merging the two projections per gantry angle. Herein, the authors present a new SMOG approach which acquires a single projection per gantry angle, with complimentary grid patterns for any two adjacent projections, and use an interprojection sensor fusion (IPSF) technique to estimate the blocked signal in each projection. The method may have the additional benefit of reduced imaging dose due to the grid blocking half of the incident radiation. Methods: The IPSF considers multiple paired observations from two adjacent gantry angles as approximations of the blocked signal and uses a weighted least square regression of these observations to finally determine the blocked signal. The method was first tested with a simulated SMOG on a head phantom. The signal to noise ratio (SNR), which represents the difference of the recovered CBCT image to the original image without the SMOG, was used to evaluate the ability of the IPSF in recovering the missing signal. The IPSF approach was then tested using a Catphan phantom on a prototype SMOG assembly installed in a bench top CBCT system. Results: In the simulated SMOG experiment, the SNRs were increased from 15.1 and 12.7 dB to 35.6 and 28.9 dB comparing with a conventional interpolation method (inpainting method) for a projection and the reconstructed 3D image, respectively, suggesting that IPSF successfully recovered most of blocked signal. In the prototype SMOG experiment, the authors have successfully reconstructed a CBCT image using the IPSF-SMOG approach. The detailed geometric features in the

  4. Prophylaxis of functional violations of spine by liquidation of post-loadings changes in locomotorium of overhead acrobats

    Directory of Open Access Journals (Sweden)

    Maximova Y.A.

    2012-12-01

    Full Text Available The attempt of liquidation of convertible changes of locomotorium is undertaken, as a result of pathobiomechanical influence of intensive, specific training activity of acrobats. In an experiment took part 40 sportsmen aged 12-13 years. It is set that 75% sportsmen in the process of training and after its completion extremely rarely utillize facilities and methods of renewal. Grounded and developed program, directed on liquidation of post-loadings changes in the system of spine of overhead acrobats, gettings busy on the stage of the specialized base preparation. Development of complex of exercises principle of minimum physiological training sufficientness (minimum optimum of physical exercises was underlaid. It is shown that the biomechanics correction of the functional state of spine, reduction of post-loadings deformations, improvement of metabolism of the trophic systems of intervertebral disks, for certain reduced pathogenic influence of the intensive specific loadings on the spine of sportsmen.

  5. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  6. Managing your engineering consultants: Steps for simultaneously improving operations, project implementation, and your bottom line

    International Nuclear Information System (INIS)

    Kirchen, E.R.; Perilloux, B.L.

    1997-01-01

    The domestic oil and gas industry has responded to depleting reserves and increasing operating costs by downsizing the overhead required to maintain production and processing facilities. For many companies this downsizing has resulted in a reduced in-house engineering staff and a greater reliance on consulting engineering services. To get the most benefit from consulting engineering companies, the partnership between consultants and the oil and gas company needs to be carefully considered. Unfortunately, these partnerships are often developed at the home office with visionary goals in mind, only to be implemented reluctantly on a local level. A better strategy is to implement partnering tools on the local level and allow these partnerships to develop naturally, and at times, uniquely, at each location. The following such tools detailed in this paper are: manpower leveraging -- using field-trained consulting engineers to address project design/implementation and field/construction support so that the operating company's engineers may focus on management and detailed development of high-return projects; enhanced project scope and design review -- developing and reviewing project scope(s) and preliminary engineering designs to minimize engineering/construction costs as well as optimize the operability and constructability of the project; and consulting rate standardization -- understanding and structuring the consultant's rates so that neither side is exploited and so that the project is staffed in the interest of project execution and not maximum profits for the consultant

  7. Improved Methodology for Benefit Estimation of Preservation Projects

    Science.gov (United States)

    2018-04-01

    This research report presents an improved process for evaluating the benefits and economic tradeoffs associated with a variety of highway preservation projects. It includes a summary of results from a comprehensive phone survey concerning the use and...

  8. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  9. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  10. Combined equations for estimating global solar radiation: Projection of radiation field over Japan under global warming conditions by statistical downscaling

    International Nuclear Information System (INIS)

    Iizumi, T.; Nishimori, M.; Yokozawa, M.

    2008-01-01

    For this study, we developed a new statistical model to estimate the daily accumulated global solar radiation on the earth's surface and used the model to generate a high-resolution climate change scenario of the radiation field in Japan. The statistical model mainly relies on precipitable water vapor calculated from air temperature and relative humidity on the surface to estimate seasonal changes in global solar radiation. On the other hand, to estimate daily radiation fluctuations, the model uses either a diurnal temperature range or relative humidity. The diurnal temperature range, calculated from the daily maximum and minimum temperatures, and relative humidity is a general output of most climate models, and pertinent observation data are comparatively easy to access. The statistical model performed well when estimating the monthly mean value, daily fluctuation statistics, and regional differences in the radiation field in Japan. To project the change in the radiation field for the years 2081 to 2100, we applied the statistical model to the climate change scenario of a high-resolution Regional Climate Model with a 20-km mesh size (RCM20) developed at the Meteorological Research Institute based on the Special Report for Emission Scenario (SRES)-A2. The projected change shows the following tendency: global solar radiation will increase in the warm season and decrease in the cool season in many areas of Japan, indicating that global warming may cause changes in the radiation field in Japan. The generated climate change scenario for the radiation field is linked to long-term and short-term changes in air temperature and relative humidity obtained from the RCM20 and, consequently, is expected to complement the RCM20 datasets for an impact assessment study in the agricultural sector

  11. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  12. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  13. Outer planet probe cost estimates: First impressions

    Science.gov (United States)

    Niehoff, J.

    1974-01-01

    An examination was made of early estimates of outer planetary atmospheric probe cost by comparing the estimates with past planetary projects. Of particular interest is identification of project elements which are likely cost drivers for future probe missions. Data are divided into two parts: first, the description of a cost model developed by SAI for the Planetary Programs Office of NASA, and second, use of this model and its data base to evaluate estimates of probe costs. Several observations are offered in conclusion regarding the credibility of current estimates and specific areas of the outer planet probe concept most vulnerable to cost escalation.

  14. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    Science.gov (United States)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  15. APhoRISM FP7 project: the Multi-platform volcanic Ash Cloud Estimation (MACE) infrastructure

    Science.gov (United States)

    Merucci, Luca; Corradini, Stefano; Bignami, Christian; Stramondo, Salvatore

    2014-05-01

    APHORISM is an FP7 project that aims to develop innovative products to support the management and mitigation of the volcanic and the seismic crisis. Satellite and ground measurements will be managed in a novel manner to provide new and improved products in terms of accuracy and quality of information. The Multi-platform volcanic Ash Cloud Estimation (MACE) infrastructure will exploit the complementarity between geostationary, and polar satellite sensors and ground measurements to improve the ash detection and retrieval and to fully characterize the volcanic ash clouds from source to the atmosphere. The basic idea behind the proposed method consists to manage in a novel manner, the volcanic ash retrievals at the space-time scale of typical geostationary observations using both the polar satellite estimations and in-situ measurements. The typical ash thermal infrared (TIR) retrieval will be integrated by using a wider spectral range from visible (VIS) to microwave (MW) and the ash detection will be extended also in case of cloudy atmosphere or steam plumes. All the MACE ash products will be tested on three recent eruptions representative of different eruption styles in different clear or cloudy atmospheric conditions: Eyjafjallajokull (Iceland) 2010, Grimsvotn (Iceland) 2011 and Etna (Italy) 2011-2012. The MACE infrastructure will be suitable to be implemented in the next generation of ESA Sentinels satellite missions.

  16. Estimate of the global-scale joule heating rates in the thermosphere due to time mean currents

    International Nuclear Information System (INIS)

    Roble, R.G.; Matsushita, S.

    1975-01-01

    An estimate of the global-scale joule heating rates in the thermosphere is made based on derived global equivalent overhead electric current systems in the dynamo region during geomagnetically quiet and disturbed periods. The equivalent total electric field distribution is calculated from Ohm's law. The global-scale joule heating rates are calculated for various monthly average periods in 1965. The calculated joule heating rates maximize at high latitudes in the early evening and postmidnight sectors. During geomagnetically quiet times the daytime joule heating rates are considerably lower than heating by solar EUV radiation. However, during geomagnetically disturbed periods the estimated joule heating rates increase by an order of magnitude and can locally exceed the solar EUV heating rates. The results show that joule heating is an important and at times the dominant energy source at high latitudes. However, the global mean joule heating rates calculated near solar minimum are generally small compared to the global mean solar EUV heating rates. (auth)

  17. Comprehensive Sustainability Evaluation of High-Speed Railway (HSR Construction Projects Based on Unascertained Measure and Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Yongzhi Chang

    2018-02-01

    Full Text Available This paper aims to evaluate the sustainability of high-speed railway (HSR construction projects in a comprehensive manner. To this end, the author established an index system, involving 4 primary indices, 9 secondary indices, and 32 tertiary indices. The analytic hierarchy process (AHP and the unascertained measure were introduced to calculate the weights of these indices. Then, the index system was applied to evaluate the sustainability of the China’s Harbin-Dalian Passenger Dedicated Line (PDL. The results show that the Harbin-Dalian PDL project achieved good results in terms of process, economic benefit, impact, and sustainability, and will bring long-term benefits in the fields of tourism, economy, and transport capacity, as well as many other fields. In spite of its good overall sustainability, the project needs to further increase its economic benefits and reduce its negative environmental impact. For this purpose, it is necessary to adopt the management mode of “separation between network and transportation” and apply noise prevention measures like noise barriers, tunnels, and overhead viaducts. This research lays a solid basis for the sustainability evaluation of HSR construction projects, and simplifies the modelling process for designers of HSR.

  18. McCullough to Liberty fiber optics project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ``McCullough to Liberty Fiber Optics Project`` (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI).

  19. McCullough to Liberty fiber optics project

    International Nuclear Information System (INIS)

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ''McCullough to Liberty Fiber Optics Project'' (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI)

  20. Projections onto Convex Sets Super-Resolution Reconstruction Based on Point Spread Function Estimation of Low-Resolution Remote Sensing Images

    Directory of Open Access Journals (Sweden)

    Chong Fan

    2017-02-01

    Full Text Available To solve the problem on inaccuracy when estimating the point spread function (PSF of the ideal original image in traditional projection onto convex set (POCS super-resolution (SR reconstruction, this paper presents an improved POCS SR algorithm based on PSF estimation of low-resolution (LR remote sensing images. The proposed algorithm can improve the spatial resolution of the image and benefit agricultural crop visual interpolation. The PSF of the highresolution (HR image is unknown in reality. Therefore, analysis of the relationship between the PSF of the HR image and the PSF of the LR image is important to estimate the PSF of the HR image by using multiple LR images. In this study, the linear relationship between the PSFs of the HR and LR images can be proven. In addition, the novel slant knife-edge method is employed, which can improve the accuracy of the PSF estimation of LR images. Finally, the proposed method is applied to reconstruct airborne digital sensor 40 (ADS40 three-line array images and the overlapped areas of two adjacent GF-2 images by embedding the estimated PSF of the HR image to the original POCS SR algorithm. Experimental results show that the proposed method yields higher quality of reconstructed images than that produced by the blind SR method and the bicubic interpolation method.

  1. Global Mortality Estimates for the 2009 Influenza Pandemic from the GLaMOR Project: A Modeling Study

    Science.gov (United States)

    Simonsen, Lone; Spreeuwenberg, Peter; Lustig, Roger; Taylor, Robert J.; Fleming, Douglas M.; Kroneman, Madelon; Van Kerkhove, Maria D.; Mounts, Anthony W.; Paget, W. John

    2013-01-01

    Background Assessing the mortality impact of the 2009 influenza A H1N1 virus (H1N1pdm09) is essential for optimizing public health responses to future pandemics. The World Health Organization reported 18,631 laboratory-confirmed pandemic deaths, but the total pandemic mortality burden was substantially higher. We estimated the 2009 pandemic mortality burden through statistical modeling of mortality data from multiple countries. Methods and Findings We obtained weekly virology and underlying cause-of-death mortality time series for 2005–2009 for 20 countries covering ∼35% of the world population. We applied a multivariate linear regression model to estimate pandemic respiratory mortality in each collaborating country. We then used these results plus ten country indicators in a multiple imputation model to project the mortality burden in all world countries. Between 123,000 and 203,000 pandemic respiratory deaths were estimated globally for the last 9 mo of 2009. The majority (62%–85%) were attributed to persons under 65 y of age. We observed a striking regional heterogeneity, with almost 20-fold higher mortality in some countries in the Americas than in Europe. The model attributed 148,000–249,000 respiratory deaths to influenza in an average pre-pandemic season, with only 19% in persons mortality was ∼10-fold higher than the World Health Organization's laboratory-confirmed mortality count. Although the pandemic mortality estimate was similar in magnitude to that of seasonal influenza, a marked shift toward mortality among persons mortality and hospitalization surveillance data is needed to rapidly establish the severity of future pandemics. Please see later in the article for the Editors' Summary PMID:24302890

  2. Mayan Forest Road Projects

    DEFF Research Database (Denmark)

    Conde, Dalia Amor

    2008-01-01

    Road-building projects in the Mayan Biosphere Reserve to connect Mexico and Guatemala were subjected to a cost-benefit evaluation. Up to an estimated 311,000 hectares of jaguar habitat were found to be at risk of deforestation due to these projects. Some of the projects were shown to have negativ...... of continued conservation rather than road development....

  3. Distributed Dynamic State Estimator, Generator Parameter Estimation and Stability Monitoring Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Meliopoulos, Sakis [Georgia Inst. of Technology, Atlanta, GA (United States); Cokkinides, George [Georgia Inst. of Technology, Atlanta, GA (United States); Fardanesh, Bruce [New York Power Authority, NY (United States); Hedrington, Clinton [U.S. Virgin Islands Water and Power Authority (WAPA), St. Croix (U.S. Virgin Islands)

    2013-12-31

    This is the final report for this project that was performed in the period: October1, 2009 to June 30, 2013. In this project, a fully distributed high-fidelity dynamic state estimator (DSE) that continuously tracks the real time dynamic model of a wide area system with update rates better than 60 times per second is achieved. The proposed technology is based on GPS-synchronized measurements but also utilizes data from all available Intelligent Electronic Devices in the system (numerical relays, digital fault recorders, digital meters, etc.). The distributed state estimator provides the real time model of the system not only the voltage phasors. The proposed system provides the infrastructure for a variety of applications and two very important applications (a) a high fidelity generating unit parameters estimation and (b) an energy function based transient stability monitoring of a wide area electric power system with predictive capability. Also the dynamic distributed state estimation results are stored (the storage scheme includes data and coincidental model) enabling an automatic reconstruction and “play back” of a system wide disturbance. This approach enables complete play back capability with fidelity equal to that of real time with the advantage of “playing back” at a user selected speed. The proposed technologies were developed and tested in the lab during the first 18 months of the project and then demonstrated on two actual systems, the USVI Water and Power Administration system and the New York Power Authority’s Blenheim-Gilboa pumped hydro plant in the last 18 months of the project. The four main thrusts of this project, mentioned above, are extremely important to the industry. The DSE with the achieved update rates (more than 60 times per second) provides a superior solution to the “grid visibility” question. The generator parameter identification method fills an important and practical need of the industry. The “energy function” based

  4. Thermometer by optical fiber for ampacity studies in overhead transmission lines; Termometro a fibra optica para estudo da ampacidade em linhas de transmissao aereas

    Energy Technology Data Exchange (ETDEWEB)

    Valente, L.C.G.; Kawase, L.R.; Silva Filho, J.I. da; Silva, J.M.M. da [Centro de Pesquisas de Energia Eletrica, Rio de Janeiro, RJ (Brazil); Igarashi, A.Y. [Universidade Federal, Rio de Janeiro, RJ (Brazil)

    1995-12-31

    This article suggests the utilization of thermometers constructed from optical fibers technology in overhead power transmission lines. This will help the studies in progress about the electric power systems ampacity. It also presents the advantages of using optical fibers instead of conventional thermometers. As an example, the fact that the optical fibers are dielectric and make possible the remote monitoring. It is also shown a possibility of introducing such measuring system in electric junctions where OPGW cables are used 4 refs., 4 figs.; e-mail: liliana at fis.puc-rio.br

  5. On-Line Use of Three-Dimensional Marker Trajectory Estimation From Cone-Beam Computed Tomography Projections for Precise Setup in Radiotherapy for Targets With Respiratory Motion

    International Nuclear Information System (INIS)

    Worm, Esben S.; Høyer, Morten; Fledelius, Walther; Nielsen, Jens E.; Larsen, Lars P.; Poulsen, Per R.

    2012-01-01

    Purpose: To develop and evaluate accurate and objective on-line patient setup based on a novel semiautomatic technique in which three-dimensional marker trajectories were estimated from two-dimensional cone-beam computed tomography (CBCT) projections. Methods and Materials: Seven treatment courses of stereotactic body radiotherapy for liver tumors were delivered in 21 fractions in total to 6 patients by a linear accelerator. Each patient had two to three gold markers implanted close to the tumors. Before treatment, a CBCT scan with approximately 675 two-dimensional projections was acquired during a full gantry rotation. The marker positions were segmented in each projection. From this, the three-dimensional marker trajectories were estimated using a probability based method. The required couch shifts for patient setup were calculated from the mean marker positions along the trajectories. A motion phantom moving with known tumor trajectories was used to examine the accuracy of the method. Trajectory-based setup was retrospectively used off-line for the first five treatment courses (15 fractions) and on-line for the last two treatment courses (6 fractions). Automatic marker segmentation was compared with manual segmentation. The trajectory-based setup was compared with setup based on conventional CBCT guidance on the markers (first 15 fractions). Results: Phantom measurements showed that trajectory-based estimation of the mean marker position was accurate within 0.3 mm. The on-line trajectory-based patient setup was performed within approximately 5 minutes. The automatic marker segmentation agreed with manual segmentation within 0.36 ± 0.50 pixels (mean ± SD; pixel size, 0.26 mm in isocenter). The accuracy of conventional volumetric CBCT guidance was compromised by motion smearing (≤21 mm) that induced an absolute three-dimensional setup error of 1.6 ± 0.9 mm (maximum, 3.2) relative to trajectory-based setup. Conclusions: The first on-line clinical use of

  6. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  7. Cost Estimates and Investment Decisions

    International Nuclear Information System (INIS)

    Emhjellen, Kjetil; Emhjellen Magne; Osmundsen, Petter

    2001-08-01

    When evaluating new investment projects, oil companies traditionally use the discounted cashflow method. This method requires expected cashflows in the numerator and a risk adjusted required rate of return in the denominator in order to calculate net present value. The capital expenditure (CAPEX) of a project is one of the major cashflows used to calculate net present value. Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. In the oil industry and many other industries, it is common practice to report a CAPEX that is the estimated 50/50 (median) CAPEX instead of the estimated expected (expected value) CAPEX. In this article we demonstrate how the practice of using a 50/50 (median) CAPEX, when the cost distributions are asymmetric, causes project valuation errors and therefore may lead to wrong investment decisions with acceptance of projects that have negative net present values. (author)

  8. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  9. Sensor Fusion for Nuclear Proliferation Activity Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Adel Ghanem, Ph D

    2007-03-30

    The objective of Phase 1 of this STTR project is to demonstrate a Proof-of-Concept (PoC) of the Geo-Rad system that integrates a location-aware SmartTag (made by ZonTrak) and a radiation detector (developed by LLNL). It also includes the ability to transmit the collected radiation data and location information to the ZonTrak server (ZonService). The collected data is further transmitted to a central server at LLNL (the Fusion Server) to be processed in conjunction with overhead imagery to generate location estimates of nuclear proliferation and radiation sources.

  10. Sustainable Energy (SUSEN) project

    International Nuclear Information System (INIS)

    Richter, Jiri

    2012-01-01

    Research Centre Rez and University of West Bohemia started preparatory work on the 'Sustainable Energy' project, financed from EU structural funds. The goals and expected results of the project, its organization, estimated costs, time schedule and current status are described. (orig.)

  11. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  12. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  13. Fan-out Estimation in Spin-based Quantum Computer Scale-up.

    Science.gov (United States)

    Nguyen, Thien; Hill, Charles D; Hollenberg, Lloyd C L; James, Matthew R

    2017-10-17

    Solid-state spin-based qubits offer good prospects for scaling based on their long coherence times and nexus to large-scale electronic scale-up technologies. However, high-threshold quantum error correction requires a two-dimensional qubit array operating in parallel, posing significant challenges in fabrication and control. While architectures incorporating distributed quantum control meet this challenge head-on, most designs rely on individual control and readout of all qubits with high gate densities. We analysed the fan-out routing overhead of a dedicated control line architecture, basing the analysis on a generalised solid-state spin qubit platform parameterised to encompass Coulomb confined (e.g. donor based spin qubits) or electrostatically confined (e.g. quantum dot based spin qubits) implementations. The spatial scalability under this model is estimated using standard electronic routing methods and present-day fabrication constraints. Based on reasonable assumptions for qubit control and readout we estimate 10 2 -10 5 physical qubits, depending on the quantum interconnect implementation, can be integrated and fanned-out independently. Assuming relatively long control-free interconnects the scalability can be extended. Ultimately, the universal quantum computation may necessitate a much higher number of integrated qubits, indicating that higher dimensional electronics fabrication and/or multiplexed distributed control and readout schemes may be the preferredstrategy for large-scale implementation.

  14. Global mortality estimates for the 2009 Influenza Pandemic from the GLaMOR project: a modeling study.

    Directory of Open Access Journals (Sweden)

    Lone Simonsen

    2013-11-01

    Full Text Available Assessing the mortality impact of the 2009 influenza A H1N1 virus (H1N1pdm09 is essential for optimizing public health responses to future pandemics. The World Health Organization reported 18,631 laboratory-confirmed pandemic deaths, but the total pandemic mortality burden was substantially higher. We estimated the 2009 pandemic mortality burden through statistical modeling of mortality data from multiple countries.We obtained weekly virology and underlying cause-of-death mortality time series for 2005-2009 for 20 countries covering ∼35% of the world population. We applied a multivariate linear regression model to estimate pandemic respiratory mortality in each collaborating country. We then used these results plus ten country indicators in a multiple imputation model to project the mortality burden in all world countries. Between 123,000 and 203,000 pandemic respiratory deaths were estimated globally for the last 9 mo of 2009. The majority (62%-85% were attributed to persons under 65 y of age. We observed a striking regional heterogeneity, with almost 20-fold higher mortality in some countries in the Americas than in Europe. The model attributed 148,000-249,000 respiratory deaths to influenza in an average pre-pandemic season, with only 19% in persons <65 y. Limitations include lack of representation of low-income countries among single-country estimates and an inability to study subsequent pandemic waves (2010-2012.We estimate that 2009 global pandemic respiratory mortality was ∼10-fold higher than the World Health Organization's laboratory-confirmed mortality count. Although the pandemic mortality estimate was similar in magnitude to that of seasonal influenza, a marked shift toward mortality among persons <65 y of age occurred, so that many more life-years were lost. The burden varied greatly among countries, corroborating early reports of far greater pandemic severity in the Americas than in Australia, New Zealand, and Europe. A

  15. Estimation of Truck Trips on Large-Scale Irrigation Project: A Combinatory Input-Output Commodity-Based Approach

    Directory of Open Access Journals (Sweden)

    Ackchai Sirikijpanichkul

    2015-01-01

    Full Text Available For the agricultural-based countries, the requirement on transportation infrastructure should not only be limited to accommodate general traffic but also the transportation of crop and agricultural products during the harvest seasons. Most of the past researches focus on the development of truck trip estimation techniques for urban, statewide, or nationwide freight movement but neglect the importance of rural freight movement which contributes to pavement deterioration on rural roads especially during harvest seasons. Recently, the Thai Government initiated a plan to construct a network of reservoirs within the northeastern region, aiming at improving existing irrigation system particularly in the areas where a more effective irrigation system is needed. It is expected to bring in new opportunities on expanding the cultivation areas, increasing the economy of scale and enlarging the extent market of area. As a consequence, its effects on truck trip generation needed to be investigated to assure the service quality of related transportation infrastructure. This paper proposes a combinatory input-output commodity-based approach to estimate truck trips on rural highway infrastructure network. The large-scale irrigation project for the northeastern of Thailand is demonstrated as a case study.

  16. TNB high tension overhead cables: is their electromagnetic field hazard real?

    International Nuclear Information System (INIS)

    Roha Tukimin; Mohd Yusof Mohd Ali; Mohamad Amirul Nizam

    2005-01-01

    Extremely low frequency electromagnetic fields (ELF, EMF) fall under the category of non-ionising radiation. We live in an electromagnetic environment generated by both natural (earths magnetic field, sunlight) and man-made. One of the man-made sources which produces significant electromagnetic fields (EMF) is the electric power supply system. In modern time, electricity has become an essential part of our lives. Electric power supply system, which includes generation, transmission and distribution of the electricity, produces extremely low frequency electromagnetic fields (ELF EMF) that travel along the overhead cables at 50 cycles per second (50 Hz).They are a form of energy that travels in space as electromagnetic waves. In spite of the fact that ELF EMF are very weak electromagnetic emission, they are believed to be hazardous to human health because of their ability to induce current and to initiate energy deposition in the body, which may eventually lead to increase in body temperature, behavioral changes and perhaps cancer in the long term. Due to their potential of causing such health hazard, several companies have approached and requested MINT to carry out surveys and safety assessments of their land properties, which are located close to the transmission lines. This paper highlights some of the works that had been carried out by MINT based on the requests received. They were performed based on international standard IEEE procedures protocols using properly calibrated portable ELF instruments. The results confirmed that ELF EMF did present at the survey sites but were very much lower than the permissible exposure limit recommended for members of public (1000 m Gauss / 5000 V/m). They were found to vary against measurements locations, which were strongly influenced by vertical and horizontal distances from the cables and by the presence of other objects like building and trees. (Author)

  17. 76 FR 77029 - Submission for OMB Review; Comment Request

    Science.gov (United States)

    2011-12-09

    ... other information relating to the appreciation or depreciation of portfolio securities. If an estimated... multiplied by 5.35 to account for bonuses, firm size, employee benefits, and overhead. \\6\\ Hourly rates are... work- year and multiplied by 2.93 to account for bonuses, firm size, employee benefits and overhead. To...

  18. DOTD support for UTC project : travel time estimation using bluetooth, [research project capsule].

    Science.gov (United States)

    2013-10-01

    Travel time estimates are useful tools for measuring congestion in an urban area. Current : practice involves using probe vehicles or video cameras to measure travel time, but this is a laborintensive and expensive means of obtaining the information....

  19. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  20. Estimating the cost of disposal for Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Ates, Y.

    1996-07-01

    Atomic Energy of Canada Ltd (AECL) prepared an Environmental Impact Statement and nine supporting Primary Reference Documents on the concept for disposal of Canada's nuclear fuel waste. This report summarizes the basis of the cost estimate which is provided in the primary reference document on engineering for a disposal facility. The scope of the cost estimate is explained by describing the key features of the disposal facility design, by noting the major assumptions made in preparing the estimates, and by listing the included and excluded cost components. An activity-based project planning and control method is explained whereby the project schedule, costs, and personnel requirements are interlinked; forming an integrated perspective on the total project life cycle. The summary and distribution of costs in each project stage by major facility or activity are presented. The results of studies which reviewed the overall cost estimate are also described. These studies indicate that, within the scope, the estimate is reasonable and compares well with similar international studies. (author)

  1. Exploratory shaft liner corrosion estimate

    International Nuclear Information System (INIS)

    Duncan, D.R.

    1985-10-01

    An estimate of expected corrosion degradation during the 100-year design life of the Exploratory Shaft (ES) is presented. The basis for the estimate is a brief literature survey of corrosion data, in addition to data taken by the Basalt Waste Isolation Project. The scope of the study is expected corrosion environment of the ES, the corrosion modes of general corrosion, pitting and crevice corrosion, dissimilar metal corrosion, and environmentally assisted cracking. The expected internal and external environment of the shaft liner is described in detail and estimated effects of each corrosion mode are given. The maximum amount of general corrosion degradation was estimated to be 70 mils at the exterior and 48 mils at the interior, at the shaft bottom. Corrosion at welds or mechanical joints could be significant, dependent on design. After a final determination of corrosion allowance has been established by the project it will be added to the design criteria. 10 refs., 6 figs., 5 tabs

  2. Pre-stack estimation of time-lapse seismic velocity changes : an example from the Sleipner CO2-sequestration project

    International Nuclear Information System (INIS)

    Ghaderi, A.; Landro, M.; Ghaderi, A.

    2005-01-01

    Carbon dioxide (CO 2 ) is being injected into a shallow sand formation at around a 1,000 metre depth at the Sleipner Field located in the North Sea. It is expected that the CO 2 injected in the bottom of the formation, will form a plume consisting of CO 2 accumulating in thin lenses during migration up through the reservoir. Several studies have been published using stacked seismic data from 1994, 1999, 2001 and 2002. A thorough analysis of post-stack seismic data from the Sleipner CO2-Sequestration Pilot Project was conducted. Interpretation of seismic data is usually done on post-stack data. For a given subsurface reflection point, seismic data are acquired for various incidence angles, typically 40 angles. These 40 seismic signals are stacked together in order to reduce noise. The term pre-stack refers to seismic data prior to this step. For hydrocarbon-related 4-dimensional seismic studies, travel time shift estimations have been used. This paper compared pre-stack and post-stack estimation of average velocity changes based on measured 4-dimensional travel time shifts. It is more practical to compare estimated velocity changes than the actual travel time changes, since the time shifts vary with offset for pre-stack time-lapse seismic analysis. It was concluded that the pre-stack method gives smaller velocity changes when estimated between two key horizons. Therefore, pre-stack travel time analysis in addition to conventional post-stack analysis is recommended. 6 refs., 12 figs

  3. ERP services effort estimation strategies based on early requirements

    NARCIS (Netherlands)

    Erasmus, I.P.; Daneva, Maia; Kalenborg, Axel; Trapp, Marcus

    2015-01-01

    ERP clients and vendors necessarily estimate their project interventions at a very early stage, before the full requirements to an ERP solution are known and often before a contract is finalized between a vendor/ consulting company and a client. ERP project estimation at the stage of early

  4. Solar Tyrol project: using climate data for energy production estimation. The good practice of Tyrol in conceptualizing climate services.

    Science.gov (United States)

    Petitta, Marcello; Wagner, Jochen; Costa, Armin; Monsorno, Roberto; Innerebner, Markus; Moser, David; Zebisch, Marc

    2014-05-01

    The scientific community in the last years is largely discussing the concept of "Climate services". Several definitions have been used, but it still remains a rather open concept. We used climate data from analysis and reanalysis to create a daily and hourly model of atmospheric turbidity in order to account the effect of the atmosphere on incoming solar radiation with the final aim of estimating electric production from Photovoltaic (PV) Modules in the Alps. Renewable Energy production in the Alpine Region is dominated by hydroelectricity, but the potential for photovoltaic energy production is gaining momentum. Especially the southern part of the Alps and inner Alpine regions offer good conditions for PV energy production. The combination of high irradiance values and cold air temperature in mountainous regions is well suited for solar cells. To enable more widespread currency of PV plants, PV has to become an important part in regional planning. To provide regional authorities and also private stakeholders with high quality PV energy yield climatology in the provinces of Bolzano/Bozen South Tirol (Italy) and Tyrol (Austria), the research project Solar Tyrol was inaugurated in 2012. Several methods are used to calculate very high resolution maps of solar radiation. Most of these approaches use climatological values. In this project we reconstructed the last 10 years of atmospheric turbidity using reanalysis and operational data in order to better estimate incoming solar radiation in the alpine region. Our method is divided into three steps: i) clear sky radiation: to estimate the atmospheric effect on solar radiation we calculated Linke Turbidity factor using aerosols optical depth (AOD), surface albedo, atmospheric pressure, and total water content from ECMWF and MACC analysis. ii) shadows: we calculated shadows of mountains and buildings using a 2 meter-resolution digital elevation model of the area and GIS module r.sun modified to fit our specific needs. iii

  5. Low-overhead interference mitigation scheme for collaborative channel assignment in overloaded multiantenna femtocells

    KAUST Repository

    Radaydeh, Redha Mahmoud Mesleh

    2012-09-01

    This paper proposes a collaborative-based scheme for a transmit antenna channel assignment in overloaded multiantenna femtocells, with the aim of reducing the overhead load. It is assumed that multiple femtocell access points (FAPs) are deployed to sequentially allocate the available resources to scheduled users while reducing the interference experienced by each active user. The FAPs operate concurrently and each of them is allocated an orthogonal channel and employs a transmit array of arbitrary size. The suitable FAP and its associated transmit channel are then identified based on the noncoherently predicted interference power levels on available channels when feedback links are capacity limited. The effect of possible FAP failure or infeasibility to collaborate is characterized for different operating conditions. The applicability of the proposed scheme for specific cases, such as the use of directional antennas in each FAP or shared channels among different FAPs, is also discussed. For arbitrary statistical models of interference power levels on different channels, the average numbers of collaboration requests and examined transmit antenna channels are quantified. Moreover, the statistics of the resulting interference power are derived, which are then used to study various system performance measures. The effect of the interference threshold on the aforementioned measures for processing load and achieved performance is investigated. Numerical and simulations results are presented to support the analytical development and to clarify the tradeoff between the achieved performance enhancement using the proposed scheme and the required processing load for different operating scenarios. © 1967-2012 IEEE.

  6. Low-overhead interference mitigation scheme for collaborative channel assignment in overloaded multiantenna femtocells

    KAUST Repository

    Radaydeh, Redha Mahmoud Mesleh; Alouini, Mohamed-Slim

    2012-01-01

    This paper proposes a collaborative-based scheme for a transmit antenna channel assignment in overloaded multiantenna femtocells, with the aim of reducing the overhead load. It is assumed that multiple femtocell access points (FAPs) are deployed to sequentially allocate the available resources to scheduled users while reducing the interference experienced by each active user. The FAPs operate concurrently and each of them is allocated an orthogonal channel and employs a transmit array of arbitrary size. The suitable FAP and its associated transmit channel are then identified based on the noncoherently predicted interference power levels on available channels when feedback links are capacity limited. The effect of possible FAP failure or infeasibility to collaborate is characterized for different operating conditions. The applicability of the proposed scheme for specific cases, such as the use of directional antennas in each FAP or shared channels among different FAPs, is also discussed. For arbitrary statistical models of interference power levels on different channels, the average numbers of collaboration requests and examined transmit antenna channels are quantified. Moreover, the statistics of the resulting interference power are derived, which are then used to study various system performance measures. The effect of the interference threshold on the aforementioned measures for processing load and achieved performance is investigated. Numerical and simulations results are presented to support the analytical development and to clarify the tradeoff between the achieved performance enhancement using the proposed scheme and the required processing load for different operating scenarios. © 1967-2012 IEEE.

  7. Parallel implementation and evaluation of motion estimation system algorithms on a distributed memory multiprocessor using knowledge based mappings

    Science.gov (United States)

    Choudhary, Alok Nidhi; Leung, Mun K.; Huang, Thomas S.; Patel, Janak H.

    1989-01-01

    Several techniques to perform static and dynamic load balancing techniques for vision systems are presented. These techniques are novel in the sense that they capture the computational requirements of a task by examining the data when it is produced. Furthermore, they can be applied to many vision systems because many algorithms in different systems are either the same, or have similar computational characteristics. These techniques are evaluated by applying them on a parallel implementation of the algorithms in a motion estimation system on a hypercube multiprocessor system. The motion estimation system consists of the following steps: (1) extraction of features; (2) stereo match of images in one time instant; (3) time match of images from different time instants; (4) stereo match to compute final unambiguous points; and (5) computation of motion parameters. It is shown that the performance gains when these data decomposition and load balancing techniques are used are significant and the overhead of using these techniques is minimal.

  8. Approximate Bayesian recursive estimation

    Czech Academy of Sciences Publication Activity Database

    Kárný, Miroslav

    2014-01-01

    Roč. 285, č. 1 (2014), s. 100-111 ISSN 0020-0255 R&D Projects: GA ČR GA13-13502S Institutional support: RVO:67985556 Keywords : Approximate parameter estimation * Bayesian recursive estimation * Kullback–Leibler divergence * Forgetting Subject RIV: BB - Applied Statistics, Operational Research Impact factor: 4.038, year: 2014 http://library.utia.cas.cz/separaty/2014/AS/karny-0425539.pdf

  9. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  10. Financing, Overhead, and Profit: An In-Depth Discussion of Costs Associated with Third-Party Financing of Residential and Commercial Photovoltaic Systems

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, D.; Friedman, B.; Margolis, R.

    2013-10-01

    Previous work quantifying the non-hardware balance-of-system costs -- or soft costs -- associated with building a residential or commercial photovoltaic (PV) system has left a significant portion unsegmented in an 'other soft costs' category. This report attempts to better quantify the 'other soft costs' by focusing on the financing, overhead, and profit of residential and commercial PV installations for a specific business model. This report presents results from a bottom-up data-collection and analysis of the upfront costs associated with developing, constructing, and arranging third-party-financed residential and commercial PV systems. It quantifies the indirect corporate costs required to install distributed PV systems as well as the transactional costs associated with arranging third-party financing.

  11. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities

    International Nuclear Information System (INIS)

    Benjamin, Serge; Descures, Sylvain; Du Pasquier, Louis; Francois, Patrice; Buonarotti, Stefano; Mariotti, Giovanni; Tarakonov, Jurij; Daniska, Vladimir; Bergh, Niklas; Carroll, Simon; AaSTRoeM, Annika; Cato, Anna; De La Gardie, Fredrik; Haenggi, Hannes; Rodriguez, Jose; Laird, Alastair; Ridpath, Andy; La Guardia, Thomas; O'Sullivan, Patrick; ); Weber, Inge; )

    2017-01-01

    The cost estimation process of decommissioning nuclear facilities has continued to evolve in recent years, with a general trend towards demonstrating greater levels of detail in the estimate and more explicit consideration of uncertainties, the latter of which may have an impact on decommissioning project costs. The 2012 report on the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, a joint recommendation by the Nuclear Energy Agency (NEA), the International Atomic Energy Agency (IAEA) and the European Commission, proposes a standardised structure of cost items for decommissioning projects that can be used either directly for the production of cost estimates or for mapping of cost items for benchmarking purposes. The ISDC, however, provides only limited guidance on the treatment of uncertainty when preparing cost estimates. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, prepared jointly by the NEA and IAEA, is intended to complement the ISDC, assisting cost estimators and reviewers in systematically addressing uncertainties in decommissioning cost estimates. Based on experiences gained in participating countries and projects, the report describes how uncertainty and risks can be analysed and incorporated in decommissioning cost estimates, while presenting the outcomes in a transparent manner

  12. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  13. Error estimates in projective solutions of the radon equation

    International Nuclear Information System (INIS)

    Lubuma, M.S.

    1991-04-01

    The model Radon equation is the integral equation of the second kind defined by the interior limits of the electrostatic double layer potential relative to a curve with one angular point and characterized by the non compactness of the operator with respect to the maximum norm. It is shown that the solution to this equation is decomposable into a regular part and a finite linear combination of intrinsic singular functions. The maximal regularity of the solution and explicit formulae for the coefficients of the singular functions are given. The regularity permits to specify how slow the convergence of the classical projection method is, while the above mentioned formulae lead to modified projection methods of the Dual Singular Function Method type, with better approximations for the solution and for the coefficients of singularities. (author). 23 refs

  14. Consumption estimation in system design for real time embedded applications; Estimation de la consommation dans la conception systeme des applications embarquees temps reel

    Energy Technology Data Exchange (ETDEWEB)

    Laurent, J.

    2002-12-15

    Today, power and energy consumption have become, as time and area, an important constraint when you design a system. Indeed modern applications use more and more processing and memory resources so these lead a significant increase of consumption. Furthermore, embedded software impact is preponderant in real time system so the code optimisation has a great impact onto the consumption constraint. Several research teams have already developed estimation methodologies for processor but almost are at instruction level (ILPA). With this kind of method you have to measure the consumption of each instruction of the instruction set and also the inter-instruction consumption overhead. For complex architecture, this kind of methodology is not adapted due to the prohibitive number of consumption measures. So the characterisation time of this kind of architecture is too important furthermore with this method is very difficult to take into account the external environment. For actual architecture another method is needed to reduce the characterisation time while preserving the accuracy. The reduction of the characterisation time have to be realized by increasing the abstraction level. So, we propose here a new approach based on a functional and architectural analysis of the target in consumption point of view (FLPA). Our methodology has two steps: the first one is a modeling step and the second is estimation step. (author)

  15. Media: A Pocket Guide.

    Science.gov (United States)

    Arrasjid, Harun; Arrasjid, Dorine Audrey

    An attempt has been made to provide a concise but comprehensive guide to instructional media for instructors, students, and teachers. Topics covered include audio learning systems, overhead projection, opaque projection, slide and filmstrip projection, projection surfaces, chalkboards and markboards, graphics, models, duplicating, motion pictures,…

  16. Increasing Cone-beam projection usage by temporal fitting

    DEFF Research Database (Denmark)

    Lyksborg, Mark; Hansen, Mads Fogtmann; Larsen, Rasmus

    2010-01-01

    A Cone-beam CT system can be used to image the lung region. The system records 2D projections which will allow 3D reconstruction however a reconstruction based on all projections will lead to a blurred reconstruction in regions were respiratory motion occur. To avoid this the projections are typi......A Cone-beam CT system can be used to image the lung region. The system records 2D projections which will allow 3D reconstruction however a reconstruction based on all projections will lead to a blurred reconstruction in regions were respiratory motion occur. To avoid this the projections...... in [6] prior knowledge of the lung deformation estimated from the planning CT could be used to include all projections into the reconstruction. It has also been attempted to estimate both the motion and 3D volume simultaneously in [4]. Problems with motion estimation are ill-posed leading to suboptimal...... motion which in return affects the reconstruction. By directly including time into the image representation the effect of suboptimal motion fields are avoided and we are still capable of using phase neighbour projections. The 4D image model is fitted by solving a statistical cost function based...

  17. The Carnegie Supernova Project I. Methods to estimate host-galaxy reddening of stripped-envelope supernovae

    Science.gov (United States)

    Stritzinger, M. D.; Taddia, F.; Burns, C. R.; Phillips, M. M.; Bersten, M.; Contreras, C.; Folatelli, G.; Holmbo, S.; Hsiao, E. Y.; Hoeflich, P.; Leloudas, G.; Morrell, N.; Sollerman, J.; Suntzeff, N. B.

    2018-02-01

    We aim to improve upon contemporary methods to estimate host-galaxy reddening of stripped-envelope (SE) supernovae (SNe). To this end the Carnegie Supernova Project (CSP-I) SE SN photometry data release, consisting of nearly three dozen objects, is used to identify a minimally reddened sub-sample for each traditionally defined spectroscopic sub-type (i.e., SNe IIb, SNe Ib, SNe Ic). Inspection of the optical and near-infrared (NIR) colors and color evolution of the minimally reddened sub-samples reveals a high degree of homogeneity, particularly between 0 d to +20 d relative to B-band maximum. This motivated the construction of intrinsic color-curve templates, which when compared to the colors of reddened SE SNe, yields an entire suite of optical and NIR color excess measurements. Comparison of optical/optical vs. optical/NIR color excess measurements indicates the majority of the CSP-I SE SNe suffer relatively low amounts of reddening (i.e., E(B-V)host 0.20 mag) objects with the Fitzpatrick (1999, PASP, 111, 63) reddening law model provides robust estimates of the host visual-extinction AVhost and RVhost. In the case of the SE SNe with relatively low amounts of reddening, a preferred value of RVhost is adopted for each sub-type, resulting in estimates of AVhost through Fitzpatrick (1999) reddening law model fits to the observed color excess measurements. Our analysis suggests SE SNe reside in galaxies characterized by a range of dust properties. We also find evidence that SNe Ic are more likely to occur in regions characterized by larger RVhost values compared to SNe IIb/Ib and they also tend to suffer more extinction. The later finding is consistent with work in the literature suggesting SNe Ic tend to occur in regions of on-going star formation. Based on observations collected at Las Campanas Observatory.

  18. Externalities of fuel cycles 'ExternE' project. Hydro fuel cycle. Estimation of physical impacts and monetary valuation for priority impact pathways

    International Nuclear Information System (INIS)

    Navrud, S.; Riise, J.; Strand, J.

    1994-01-01

    The aim of the External Costs of Fuel Cycles (ExternE) study is to develop methods to measure and monetize all the externalities associated with incremental investments in electric power production, taking account of the different stages of the fuel cycles. Since fuel cycle externalities are characterised by being very site-specific, the impact pathway damage function approach, developed in ExternE, has been implemented in different European countries for each of the selected fuel cycles. This is done to demonstrate that this methodological framework can be used at different locations, to motivate further development of the methods, and to look at the sensitivity of the estimates to different locations. Electricite de France (EdF) in France and ENCO Environmental Consultants a.s. in Norway have taken on a joint responsibility for adapting the methodological framework for hydroelectric fuel cycle analyses in Europe. We report the first implementation of the hydroelectric fuel cycle within ExternE. Choice of reference site and technology Two stages of the hydroelectric fuel cycle have been identified: 1. Electricity generation 2. Transmission There are three phases of each of these stages: construction, operation and dismantling. We have assumed a construction period of 5 years (starting in 1990) and an operation period of 40 years. Dismantling after 40 years is not a realistic option. Therefore, we have focused on the construction and operation phases, of both electricity generation and transmission. The Sauda Hydroelectric Development Project (SHDP) was selected, because it illustrates upgrading and extention of an existing hydro power project. Such projects are likely to be the dominating strategy for future hydroelectric development in Norway, many other European countries and in the U.S., due to the lack of new sites available for development. SHDP consists of an extention of a previously developed area (Basis project) and six new diversion projects. The

  19. 10 CFR 603.560 - Estimate of project expenditures.

    Science.gov (United States)

    2010-01-01

    ... the recipient achieves them, are reliable indicators of the amount of effort the recipient expended. However, the estimate of the required expenditures need not be a precise dollar amount, as illustrated by the example in paragraph (b) of this section, if: (1) The recipient is contributing a substantial...

  20. Kvanefjeld uranium project

    International Nuclear Information System (INIS)

    Erlendsson, G.; Jensen, J.; Kofoed, S.; Paulsen, J.L.

    1983-11-01

    The draft uranium project ''Kvanefjeld'' describes the establishment and operation of an industrial plant for exploiting the uranium deposit at Kvanefjeld. The draft project is part of the overall pre-feasibility project and is based on its results. The draft project includes two alternative locations for the processing plant and the tailings deposit plant. The ore reserve is estimated at 56 million tons with an average content of 365 PPM. The mine will be established as an open pit, with a slope angle of 55deg. Conventional techniques are used in drilling, blasting and handling the ore. Waste rock with no uranium content will be disposed of in two ponds near the mine. The waste rock volume is estimated at 80 million tons. A processing plant for extracting uranium from the ore will be established. The technical layout of the plant is based on the extraction experiments performed at Risoe from 1981-83. Yearly capacity is 4.2 million tons of ore. Electrical energy will be supplied from a hydroelectric station to be built at Johan Dahl Land. Thermal energy (steam/heat) will be supplied from a coal-fired district heating plant to be built in connection with the processing plant. Expected power consumption is estimated at 225 GWh/year. Heat consumption is of the same order. In the third year the plant is expected to operate at full capacity. Operating costs will be Dkr. 121/ton of ore from years 1 through 7. Consumption of chemicals will be reduced from the 7th year, and operating costs will consequently drop to Dkr. 115/ton of ore. Calculations show that industrial extraction of the uranium deposit in Kvanefjeld is economically advantageous. In addition, the economy of the project is expected to improve by extracting byproducts from the ore. (EG)

  1. HFCs contribution to the greenhouse effect. Present and projected estimations

    Energy Technology Data Exchange (ETDEWEB)

    Libre, J.M.; Elf-Atochem, S.A. [Central Research & Development, Paris (France)

    1997-12-31

    This paper reviews data that can be used to calculate hydrofluorocarbon (HFC) contribution to the greenhouse effect and compare it to other trace gas contributions. Projections are made for 2010 and 2100 on the basis of available emission scenarios. Industrial judgement on the likelihood of those scenarios is also developed. Calculations can be made in two different ways: from Global Warming Potential weighted emissions of species or by direct calculation of radiative forcing based on measured and projected atmospheric concentrations of compounds. Results show that HFCs corresponding to commercial uses have a negligible contribution to the greenhouse effect in comparison with other trace gases. The projected contributions are also very small even if very high emission scenarios are maintained for decades. In 2010 this contribution remains below 1%. Longer term emissions projections are difficult. However, based on the IPCC scenario IS92a, in spite of huge emissions projected for the year 2100, the HFC contribution remains below 3%. Actually many factors indicate that the real UFC contribution to the greenhouse effect will be even smaller than presented here. Low emissive systems and small charges will likely improve sharply in the future and have drastically improved in the recent past. HFC technology implementation is likely to grow in the future, reach a maximum before the middle of the next century; the market will stabilise driven by recycling, closing of systems and competitive technologies. This hypothesis is supported by previous analysis of the demand for HTCs type applications which can be represented by {open_quotes}S{close_quotes} type curves and by recent analysis indicating that the level of substitution of old products by HFCs is growing slowly. On the basis of those data and best industrial judgement, the contribution of HFCs to the greenhouse effect is highly likely to remain below 1% during the next century. 11 refs., 2 figs., 5 tabs.

  2. A projection and density estimation method for knowledge discovery.

    Directory of Open Access Journals (Sweden)

    Adam Stanski

    Full Text Available A key ingredient to modern data analysis is probability density estimation. However, it is well known that the curse of dimensionality prevents a proper estimation of densities in high dimensions. The problem is typically circumvented by using a fixed set of assumptions about the data, e.g., by assuming partial independence of features, data on a manifold or a customized kernel. These fixed assumptions limit the applicability of a method. In this paper we propose a framework that uses a flexible set of assumptions instead. It allows to tailor a model to various problems by means of 1d-decompositions. The approach achieves a fast runtime and is not limited by the curse of dimensionality as all estimations are performed in 1d-space. The wide range of applications is demonstrated at two very different real world examples. The first is a data mining software that allows the fully automatic discovery of patterns. The software is publicly available for evaluation. As a second example an image segmentation method is realized. It achieves state of the art performance on a benchmark dataset although it uses only a fraction of the training data and very simple features.

  3. The analysis of projected fission track lengths

    International Nuclear Information System (INIS)

    Laslett, G.M.; Galbraith, R.F.; Green, P.F.

    1994-01-01

    This article deals with the question of how features of the thermal history can be estimated from projected track length measurements, i.e. lengths of the remaining parts of tracks that have intersected a surface, projected onto that surface. The appropriate mathematical theory is described and used to provide a sound basis both for understanding the nature of projected length measurements and for analysing observed data. The estimation of thermal history parameters corresponding to the current temperature, the maximum palaeotemperature and the time since cooling, is studied using laboratory data and simulations. In general the information contained in projected track lengths and angles is fairly limited, compared, for example, with that from a much smaller number of confined tracks, though we identify some circumstances when such measurements may be useful. Also it is not straightforward to extract the information and simple ad hoc estimation methods are generally inadequate. (author)

  4. Research on Energy-Saving Design of Overhead Travelling Crane Camber Based on Probability Load Distribution

    Directory of Open Access Journals (Sweden)

    Tong Yifei

    2014-01-01

    Full Text Available Crane is a mechanical device, used widely to move materials in modern production. It is reported that the energy consumptions of China are at least 5–8 times of other developing countries. Thus, energy consumption becomes an unavoidable topic. There are several reasons influencing the energy loss, and the camber of the girder is the one not to be neglected. In this paper, the problem of the deflections induced by the moving payload in the girder of overhead travelling crane is examined. The evaluation of a camber giving a counterdeflection of the girder is proposed in order to get minimum energy consumptions for trolley to move along a nonstraight support. To this aim, probabilistic payload distributions are considered instead of fixed or rated loads involved in other researches. Taking 50/10 t bridge crane as a research object, the probability loads are determined by analysis of load distribution density functions. According to load distribution, camber design under different probability loads is discussed in detail as well as energy consumptions distribution. The research results provide the design reference of reasonable camber to obtain the least energy consumption for climbing corresponding to different P0; thus energy-saving design can be achieved.

  5. AAEC nuclear power projections

    International Nuclear Information System (INIS)

    Khoe, G.; Fredsall, J.; Scurr, I.; Plotnikoff, W.

    1981-01-01

    The nuclear power capacity projections developed in the May-June period of 1981 by the AAEC are presented. There have been downward revisions for nearly all countries with centrally planned economies. Projections for the year 2000 for the Western World have decreased in aggregate by 4.7% (27Gw) compared to those of 1980. However, this reduction is less than the previous estimate reduction and there appears to have been a stabilisation in the projection

  6. History Matching and Parameter Estimation of Surface Deformation Data for a CO2 Sequestration Field Project Using Ensemble-Based Algorithms

    Science.gov (United States)

    Tavakoli, Reza; Srinivasan, Sanjay; Wheeler, Mary

    2015-04-01

    The application of ensemble-based algorithms for history matching reservoir models has been steadily increasing over the past decade. However, the majority of implementations in the reservoir engineering have dealt only with production history matching. During geologic sequestration, the injection of large quantities of CO2 into the subsurface may alter the stress/strain field which in turn can lead to surface uplift or subsidence. Therefore, it is essential to couple multiphase flow and geomechanical response in order to predict and quantify the uncertainty of CO2 plume movement for long-term, large-scale CO2 sequestration projects. In this work, we simulate and estimate the properties of a reservoir that is being used to store CO2 as part of the In Salah Capture and Storage project in Algeria. The CO2 is separated from produced natural gas and is re-injected into downdip aquifer portion of the field from three long horizontal wells. The field observation data includes ground surface deformations (uplift) measured using satellite-based radar (InSAR), injection well locations and CO2 injection rate histories provided by the operators. We implement variations of ensemble Kalman filter and ensemble smoother algorithms for assimilating both injection rate data as well as geomechanical observations (surface uplift) into reservoir model. The preliminary estimation results of horizontal permeability and material properties such as Young Modulus and Poisson Ratio are consistent with available measurements and previous studies in this field. Moreover, the existence of high-permeability channels (fractures) within the reservoir; especially in the regions around the injection wells are confirmed. This estimation results can be used to accurately and efficiently predict and quantify the uncertainty in the movement of CO2 plume.

  7. History matching and parameter estimation of surface deformation data for a CO2 sequestration field project using ensemble-based algorithm

    Science.gov (United States)

    Ping, J.; Tavakoli, R.; Min, B.; Srinivasan, S.; Wheeler, M. F.

    2015-12-01

    Optimal management of subsurface processes requires the characterization of the uncertainty in reservoir description and reservoir performance prediction. The application of ensemble-based algorithms for history matching reservoir models has been steadily increasing over the past decade. However, the majority of implementations in the reservoir engineering have dealt only with production history matching. During geologic sequestration, the injection of large quantities of CO2 into the subsurface may alter the stress/strain field which in turn can lead to surface uplift or subsidence. Therefore, it is essential to couple multiphase flow and geomechanical response in order to predict and quantify the uncertainty of CO2 plume movement for long-term, large-scale CO2 sequestration projects. In this work, we simulate and estimate the properties of a reservoir that is being used to store CO2 as part of the In Salah Capture and Storage project in Algeria. The CO2 is separated from produced natural gas and is re-injected into downdip aquifer portion of the field from three long horizontal wells. The field observation data includes ground surface deformations (uplift) measured using satellite-based radar (InSAR), injection well locations and CO2 injection rate histories provided by the operators. We implement ensemble-based algorithms for assimilating both injection rate data as well as geomechanical observations (surface uplift) into reservoir model. The preliminary estimation results of horizontal permeability and material properties such as Young Modulus and Poisson Ratio are consistent with available measurements and previous studies in this field. Moreover, the existence of high-permeability channels/fractures within the reservoir; especially in the regions around the injection wells are confirmed. This estimation results can be used to accurately and efficiently predict and monitor the movement of CO2 plume.

  8. Optimization of Barron density estimates

    Czech Academy of Sciences Publication Activity Database

    Vajda, Igor; van der Meulen, E. C.

    2001-01-01

    Roč. 47, č. 5 (2001), s. 1867-1883 ISSN 0018-9448 R&D Projects: GA ČR GA102/99/1137 Grant - others:Copernicus(XE) 579 Institutional research plan: AV0Z1075907 Keywords : Barron estimator * chi-square criterion * density estimation Subject RIV: BD - Theory of Information Impact factor: 2.077, year: 2001

  9. Reverse survival method of fertility estimation: An evaluation

    Directory of Open Access Journals (Sweden)

    Thomas Spoorenberg

    2014-07-01

    Full Text Available Background: For the most part, demographers have relied on the ever-growing body of sample surveys collecting full birth history to derive total fertility estimates in less statistically developed countries. Yet alternative methods of fertility estimation can return very consistent total fertility estimates by using only basic demographic information. Objective: This paper evaluates the consistency and sensitivity of the reverse survival method -- a fertility estimation method based on population data by age and sex collected in one census or a single-round survey. Methods: A simulated population was first projected over 15 years using a set of fertility and mortality age and sex patterns. The projected population was then reverse survived using the Excel template FE_reverse_4.xlsx, provided with Timæus and Moultrie (2012. Reverse survival fertility estimates were then compared for consistency to the total fertility rates used to project the population. The sensitivity was assessed by introducing a series of distortions in the projection of the population and comparing the difference implied in the resulting fertility estimates. Results: The reverse survival method produces total fertility estimates that are very consistent and hardly affected by erroneous assumptions on the age distribution of fertility or by the use of incorrect mortality levels, trends, and age patterns. The quality of the age and sex population data that is 'reverse survived' determines the consistency of the estimates. The contribution of the method for the estimation of past and present trends in total fertility is illustrated through its application to the population data of five countries characterized by distinct fertility levels and data quality issues. Conclusions: Notwithstanding its simplicity, the reverse survival method of fertility estimation has seldom been applied. The method can be applied to a large body of existing and easily available population data

  10. Ranking as parameter estimation

    Czech Academy of Sciences Publication Activity Database

    Kárný, Miroslav; Guy, Tatiana Valentine

    2009-01-01

    Roč. 4, č. 2 (2009), s. 142-158 ISSN 1745-7645 R&D Projects: GA MŠk 2C06001; GA AV ČR 1ET100750401; GA MŠk 1M0572 Institutional research plan: CEZ:AV0Z10750506 Keywords : ranking * Bayesian estimation * negotiation * modelling Subject RIV: BB - Applied Statistics, Operational Research http://library.utia.cas.cz/separaty/2009/AS/karny- ranking as parameter estimation.pdf

  11. Robust Parameter and Signal Estimation in Induction Motors

    DEFF Research Database (Denmark)

    Børsting, H.

    This thesis deals with theories and methods for robust parameter and signal estimation in induction motors. The project originates in industrial interests concerning sensor-less control of electrical drives. During the work, some general problems concerning estimation of signals and parameters...... in nonlinear systems, have been exposed. The main objectives of this project are: - analysis and application of theories and methods for robust estimation of parameters in a model structure, obtained from knowledge of the physics of the induction motor. - analysis and application of theories and methods...... for robust estimation of the rotor speed and driving torque of the induction motor based only on measurements of stator voltages and currents. Only contimuous-time models have been used, which means that physical related signals and parameters are estimated directly and not indirectly by some discrete...

  12. Model-based estimation for dynamic cardiac studies using ECT.

    Science.gov (United States)

    Chiao, P C; Rogers, W L; Clinthorne, N H; Fessler, J A; Hero, A O

    1994-01-01

    The authors develop a strategy for joint estimation of physiological parameters and myocardial boundaries using ECT (emission computed tomography). They construct an observation model to relate parameters of interest to the projection data and to account for limited ECT system resolution and measurement noise. The authors then use a maximum likelihood (ML) estimator to jointly estimate all the parameters directly from the projection data without reconstruction of intermediate images. They also simulate myocardial perfusion studies based on a simplified heart model to evaluate the performance of the model-based joint ML estimator and compare this performance to the Cramer-Rao lower bound. Finally, the authors discuss model assumptions and potential uses of the joint estimation strategy.

  13. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  14. Software proyecto y presupuesto de una investigación en salud A software project and estimate of a health research

    Directory of Open Access Journals (Sweden)

    Manuel Piloto Morejón

    2011-03-01

    Full Text Available Introducción: La confección de un proyecto de investigación es una tarea difícil por la diversidad de los conocimientos básicos de Metodología de la Investigación, Bioestadística y Economía, necesarios para enfrentar las diferentes secciones del mismo. Objetivo: garantizar la confección adecuada de los proyectos de investigación de cualquier nivel y la confección uniforme y facilitada del cálculo económico (presupuesto para todos los proyectos de investigación de la provincia. Material y métodos: se confeccionó un software que facilita a los investigadores la confección de un proyecto de investigación, tomando como base la guía oficial de un proyecto ramal del CITMA (según establece la Resolución Ministerial 110/2009 y los numerosos cálculos matemáticos del presupuesto de un proyecto de investigación de forma automatizada a partir de los datos económicos primarios. Resultados: el software no necesita instalación. Es un instrumento útil para cualquier investigador ya que resulta fácil de manejar. Concentra lo elemental y sencillo mediante la existencia del Manual de Usuario. Es aplicable y de pequeño tamaño (Kb, fiable y eficiente. Tiene facilidad de uso y de mantenimiento y beneficios sociales, tecnológicos, científicos y económicos. Este software es utilizado por el 100% de los investigadores de la provincia en los proyectos ramales, territoriales, institucionales, de Trabajos de Terminación de la Especialidad y Trabajos de Terminación de las Maestrías.Introduction: to prepare a project for scientific research is a difficult task due to the diversity of basic knowledge about Methodology of Scientific Research, Biostatistics and Economy which are necessary to face up the different sections of the project. Objective: to guarantee the suitable groundwork of research projects at any level as well as the uniform preparation for economic calculation (estimate of the whole research projects of the province

  15. Carbon Footprint Estimation Tool for Residential Buildings for Non-Specialized Users: OERCO2 Project

    Directory of Open Access Journals (Sweden)

    Jaime Solís-Guzmán

    2018-04-01

    Full Text Available Existing tools for environmental certification of buildings are failing in their ability to reach the general public and to create social awareness, since they require not only specialized knowledge regarding construction and energy sources, but also environmental knowledge. In this paper, an open-source online tool for the estimation of the carbon footprint of residential buildings by non-specialized users is presented as a product from the OERCO2 Erasmus + project. The internal calculations, data management and operation of this tool are extensively explained. The ten most common building typologies built in the last decade in Spain are analysed by using the OERCO2 tool, and the order of magnitude of the results is analysed by comparing them to the ranges determined by other authors. The OERCO2 tool proves itself to be reliable, with its results falling within the defined logical value ranges. Moreover, the major simplification of the interface allows non-specialized users to evaluate the sustainability of buildings. Further research is oriented towards its inclusion in other environmental certification tools and in Building Information Modeling (BIM environments.

  16. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    consisted of five distinct types of contractors, general builders, civil engineers, electricians ... Mmboswobeni Watson Ladzani, Department of Business Management, University of South .... final cost of a proposed project for a given work scope. Thus, by .... Since the test statistic does not exceed the critical region, the null.

  17. Type of Material in the Pipes Overhead Power Lines Impact on the Distribution on the Size of the Overhang and the Tension

    Science.gov (United States)

    Pawlak, Urszula; Pawlak, Marcin

    2017-10-01

    The article presents the material type from which the conductors of the overhead power lines are produced influences on the size of the overhang and the tension. The aim of the calculations was to present the benefits of the mechanics of the cable resulting from the type of cable used. The analysis was performed for two types of cables: aluminium with steel core and aluminium with composite core, twice span power line section. 10 different conductor-to-strand coil, wind, icing, and temperature variations were included in the calculations. The string description was made by means of a chain curve, while the horizontal component H of the tension force was determined using the bisection method. The loads were collected in accordance with applicable Eurocode.

  18. Requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work

    International Nuclear Information System (INIS)

    2013-01-01

    The project on the requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work includes contributions on the following topics: the development of the European transmission grid, the grid extension law, restrictions for the power grid and their infrastructure, requirements for the regulations concerning the realization of the transnational grid extension, inclusion of the public - public acceptance - communication, requirements concerning the environmental compensation law, overhead line - underground cable - health hazards, ecological effects of overhead lines and underground cables, infrastructural projects, power supply in the future, structural relief by photovoltaics.

  19. Requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work; Anforderungen an den Um- und Ausbau des Hoechstspannungsstromnetzes. Aus der Sicht von Naturschutz und Kulturlandschaftspflege

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-06-15

    The project on the requirements for the retrofitting an extension of the maximum voltage power grid from the point of view of environmental protection and cultivated landscape work includes contributions on the following topics: the development of the European transmission grid, the grid extension law, restrictions for the power grid and their infrastructure, requirements for the regulations concerning the realization of the transnational grid extension, inclusion of the public - public acceptance - communication, requirements concerning the environmental compensation law, overhead line - underground cable - health hazards, ecological effects of overhead lines and underground cables, infrastructural projects, power supply in the future, structural relief by photovoltaics.

  20. Cost Estimation and Control for Flight Systems

    Science.gov (United States)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.