WorldWideScience

Sample records for equipment service agreements

  1. 41 CFR 109-50.4801 - Equipment Gift Agreement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment Gift Agreement... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.48-Exhibits § 109-50.4801 Equipment Gift Agreement. (a) The following Equipment Gift Agreement format will be used to provide gifts of excess and/or surplus equipment...

  2. Client/consultant model services agreement

    CERN Document Server

    International Federation of Consulting Engineers

    2006-01-01

    The terms of the Client Consultant Model Services agreement (The White Book) have been prepared by the Fédération Internationale des Ingénieurs-Conseils (FIDIC) and are recommended for general use for the purposes of pre-investment and feasibility studies, designs and administration of construction and project management, where proposals for such services are invited on an international basis. They are equally adaptable for domestic agreements. - See more at: http://fidic.org/books/clientconsultant-model-services-agreement-4th-ed-2006-white-book#sthash.3Uxy5qT3.dpuf

  3. 48 CFR 870.115 - Food service equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Food service equipment... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.115 Food service equipment. (a) All new food service equipment purchased for Dietetic Service through other than Defense General...

  4. 5 CFR 575.210 - Service agreement requirements.

    Science.gov (United States)

    2010-01-01

    ... agreement must specify that if an employee does not successfully complete the training before the service... employee. (c) The service agreement must specify the total amount of the incentive, the method of paying... incentive, an agency must require the employee to sign a written service agreement to complete a specified...

  5. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  6. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  7. The political economy of services trade agreements

    OpenAIRE

    FIORINI, Matteo; LEBRAND, Mathilde

    2016-01-01

    Why do governments sign services trade agreements? This paper focuses on the role of international agreements in the context of trade in services when services are used as intermediate inputs in downstream industries. Compared to goods, services inputs are mostly non-tradable and complementary to other factors of production. We build a theoretical trade policy framework in which firms use foreign investment to contest foreign markets in services sectors and governments can restrict the entry ...

  8. Development of augmented reality system for servicing electromechanical equipment

    Science.gov (United States)

    Zhukovskiy, Y.; Koteleva, N.

    2018-05-01

    Electromechanical equipment is widely used. It is used in industrial enterprises, in the spheres of public services, in everyday life, etc. Maintenance servicing of electromechanical equipment is an important part of its life cycle. High-quality and timely service can extend the life of the electromechanical equipment. The creation of special systems that simplify the process of servicing electromechanical equipment is an urgent task. Such systems can shorten the time for maintenance of electrical equipment, and, therefore, reduce the cost of maintenance in general. This article presents an analysis of information on the operation of service services for maintenance and repair of electromechanical equipment, identifies the list of services, and estimates the time required to perform basic service operations. The structure of the augmented reality system is presented, the ways of interaction of the augmented reality system with the automated control systems working at the enterprise are presented.

  9. Negotiation and Monitoring of Service Level Agreements

    Science.gov (United States)

    Quillinan, Thomas B.; Clark, Kassidy P.; Warnier, Martijn; Brazier, Frances M. T.; Rana, Omer

    Service level agreements (SLAs) provide a means to define specific Quality of Service (QoS) guarantees between providers and consumers of services. Negotiation and definition of these QoS characteristics is an area of significant research. However, defining the actions that take place when an agreement is violated is a topic of more recent focus. This paper discusses recent advances in this field and propose some additional features that can help both consumers and producers during the enactment of services. These features include the ability to (re)negotiate penalties in an agreement, and specifically focuses on the renegotiation of penalties during enactment to reflect ongoing violations.

  10. 7 CFR 3431.17 - VMLRP service agreement offer.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false VMLRP service agreement offer. 3431.17 Section 3431... Administration of the Veterinary Medicine Loan Repayment Program § 3431.17 VMLRP service agreement offer. The Secretary will make an offer to successful applicants to enter into an agreement with the Secretary to...

  11. Is there reciprocity in preferential trade agreements on services?

    OpenAIRE

    Marchetti, Juan; Roy, Martin; Zoratto, Laura

    2012-01-01

    Are market access commitments on services in Preferential Trade Agreements (PTAs) reciprocal or simply unilateral? If reciprocal, do concessions granted in services depend on concessions received from the trading partner in other services or in non-services areas as well? In this paper we investigate the presence of reciprocity in bilateral services agreements, by sub-sector, mode of supply and type of agreement (North-North, South-North, South-South). To do so, we use a database of concessio...

  12. Enhancement of equipment services for Kozloduy NPP

    International Nuclear Information System (INIS)

    Schultz, Christophe

    2013-01-01

    Conclusion After 5 years of maintenance services, KNPP and AREVA have continuously intensified their partnership Close cooperation between KNPP, AREVA Local Office Engineers and OEM experts Involvement of sophisticated tools for diagnostics and condition monitoring Performance of engineering services and obsolescence evaluation Possibilities to perform equipment modernization of Electrical and IC equipment in future

  13. 78 FR 17234 - Negotiated Service Agreement

    Science.gov (United States)

    2013-03-20

    ... (DFS) Negotiated Service Agreement (NSA) to the market dominant product list.\\1\\ After a [[Page 17235... dominant product list.\\2\\ On March 8, 2013, the Postal Service filed an amendment to the DFS NSA with the...

  14. GreenIT Service Level Agreements

    Science.gov (United States)

    von Laszewski, Gregor; Wang, Lizhe

    In this paper we are introducing a framework towards the inclusion of Green IT metrics as part of service level agreements for future Grids and Clouds. As part of this effort we need to revisit Green IT metrics and proxies that we consider optimizing against in order to develop GreenIT as a Services (GaaS) that can be reused as part of a Software as a Service (SaaS) and Infrastructure Infrastructureas a service (IaaS) framework. We report on some of our ongoing efforts and demonstrate how we already achieve impact on the environment with our services.

  15. 78 FR 26406 - Product Change-Parcel Return Service Negotiated Service Agreement

    Science.gov (United States)

    2013-05-06

    ... POSTAL SERVICE Product Change--Parcel Return Service Negotiated Service Agreement AGENCY: Postal... United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3... Postal Service to Add Parcel Return Service Contract 4 to Competitive Product List. Documents are...

  16. 78 FR 65392 - Product Change-Parcel Return Service Negotiated Service Agreement

    Science.gov (United States)

    2013-10-31

    ... POSTAL SERVICE Product Change--Parcel Return Service Negotiated Service Agreement AGENCY: Postal... INFORMATION: The United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S.C. 3642 and... States Postal Service To Add Parcel Return Service Contract 5 to Competitive Product List. Documents are...

  17. 78 FR 12369 - Product Change-Parcel Return Service Negotiated Service Agreement

    Science.gov (United States)

    2013-02-22

    ... POSTAL SERVICE Product Change--Parcel Return Service Negotiated Service Agreement AGENCY: Postal...: The United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632... States Postal Service to Add Parcel Return Service Contract 3 to Competitive Product List. Documents are...

  18. Negotiating a Plurilateral Agreement on Trade in Services

    Directory of Open Access Journals (Sweden)

    Agnes Ghibuțiu

    2014-01-01

    Full Text Available This paper analyses the ongoing plurilateral negotiations for a new Agreement on Trade in Services. Its aim is to answer to the following set of questions: (1 What are the motivations behind these negotiations as well as the objectives of the new plurilateral trade in services agreement? How will the architecture of the new agreement look like? (2 What are the interests involved in negotiating this new plurilateral agreement on trade in services? and (3 How will it fit into the multilateral trading system revolving around the WTO? According to the findings of the paper, the new deal that is promoted by 23 like-minded WTO Members, including the EU, is a policy response to disappointment over the protracted multilateral talks and the very impasse of the Doha Round. Yet, the stakes on negotiating an ambitious market opening for services are quite high, given the importance of services in international trade and particularly their crucial role in global production networks, that dominate nowadays global production, trade and investments.

  19. 75 FR 74755 - Product Change-Parcel Return Service Negotiated Service Agreement

    Science.gov (United States)

    2010-12-01

    ... POSTAL SERVICE Product Change--Parcel Return Service Negotiated Service Agreement AGENCY: Postal.... SUPPLEMENTARY INFORMATION: The United States Postal Service[supreg] hereby gives notice that on November 17, 2010, it filed with the Postal Regulatory Commission a Request of the United States Postal Service to...

  20. 18 CFR 35.10a - Forms of service agreements.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Forms of service agreements. 35.10a Section 35.10a Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... service agreement for a service other than market-based power sales, the public utility shall include as...

  1. 12 CFR 704.16 - Contracts/written agreements.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Contracts/written agreements. 704.16 Section 704.16 Banks and Banking NATIONAL CREDIT UNION ADMINISTRATION REGULATIONS AFFECTING CREDIT UNIONS CORPORATE CREDIT UNIONS § 704.16 Contracts/written agreements. Services, facilities, personnel, or equipment...

  2. 5 CFR 575.110 - Service agreement requirements.

    Science.gov (United States)

    2010-01-01

    ... agreement commencement date until after the employee completes an initial period of formal training or... specify that if an employee does not successfully complete the training or probationary period before the... the employee. (c) The service agreement must specify the total amount of the incentive, the method of...

  3. Nuclear equipment recalsification based on the service experience

    International Nuclear Information System (INIS)

    Geambasu, A.; Segarceanu, D.

    2000-01-01

    The paper presents some considerations concerning the need of comparison between equipment performance proven by test and the service experience in Cernavoda Nuclear Plant. Service performance dana obtain partly from service failures (failures times) and partly from service experience without failure (running times) can be statistically analyzed to obtain predictions of the number of failures of unfailed units in specified period of time, means time to first failure, means time of median failure, a.s.o. These informations can be used during the operation of Nuclear Power Plant to estimate when a equipment should be replaced with a new one in order to prevent getting to the life end point. (author)

  4. 78 FR 35649 - Negotiated Service Agreement

    Science.gov (United States)

    2013-06-13

    ... whether the 2013 Agreement (1) Improves the net financial position of the Postal Service or enhances the... CFR 3015.5 (filed under seal); a public Excel file containing redacted versions of financial...

  5. 78 FR 63521 - Product Change-Parcel Select & Parcel Return Service Negotiated Service Agreement

    Science.gov (United States)

    2013-10-24

    ... Request of the United States Postal Service to Add Parcel Select & Parcel Return Service Contract 5 to... POSTAL SERVICE Product Change--Parcel Select & Parcel Return Service Negotiated Service Agreement.... SUPPLEMENTARY INFORMATION: The United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S...

  6. From product to service orientation in the maritime equipment industry

    DEFF Research Database (Denmark)

    Matzen, Detlef; McAloone, Timothy Charles

    2008-01-01

    of their products in operation. In this paper we present a case study of a shipping equipment manufacturer that is currently shifting business focus from manufacturing towards services delivery. Using a modelling scheme to differentiate and categorise different development tasks within the frame of business......In the shipping industry, operational performance of ships and their equipment is crucial to business. Suppliers of machinery and equipment are aware of this situation and see business development potential in setting up service systems that are dedicated to ensuring the performance...... development towards service oriented business, the case delivers insights into the broader context and product related parameters influencing the options and requirements for service system development....

  7. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    Background: Facilities and equipment are known to contribute to improved patient care and outcome. Hospitals for sub‑specialized pediatric anesthetic service are routinely available worldwide. In Nigeria, such hospitals now exist. It is therefore relevant to study the facilities and equipment available for pediatric anesthetic ...

  8. Research Challenges in Managing and Using Service Level Agreements

    Science.gov (United States)

    Rana, Omer; Ziegler, Wolfgang

    A Service Level Agreement (SLA) represents an agreement between a service user and a provider in the context of a particular service provision. SLAs contain Quality of Service properties that must be maintained by a provider, and as agreed between a provider and a user/client. These are generally defined as a set of Service Level Objectives (SLOs). These properties need to be measurable and must be monitored during the provision of the service that has been agreed in the SLA. The SLA must also contain a set of penalty clauses specifying what happens when service providers fail to deliver the pre-agreed quality. Hence, an SLA may be used by both a user and a provider - from a user perspective, an SLA defines what is required - often defined using non-functional attributes of service provision. From a providers perspective, an SLA may be used to support capacity planning - especially if a provider is making it's capability available to multiple users. An SLA may be used by a client and provider to manage their behaviour over time - for instance, to optimise their long running revenue (cost) or QoS attributes (such as execution time), for instance. The lifecycle of an SLA is outlined, along with various uses of SLAs to support infrastructure management. A discussion about WS-Agreement - the emerging standard for specifying SLAs - is also provided.

  9. Special servicing equipment for reactor pressurized vessel stud hole and stud accessories

    International Nuclear Information System (INIS)

    Li Jianglian

    1999-01-01

    The author briefly introduces the design and manufacture of nuclear island special servicing equipment of Nuclear Power Institute of China. Maintenance process of reactor pressurized vessel (RPV) stud hold and stud accessories the special servicing equipment include RPV flange dummy, closed-circuit television (CCTV) inspection equipment, RPV stud hole expandable comb, RPV stud hole polisher, RPV stud hold thread lubricating equipment, RPV stud hole thread miller and RPV stud hole camera. It is presented how eight kinds of special servicing equipment perform the maintenance process concerning their function, structure, and characteristics, their practical use on site is also introduced

  10. 76 FR 2930 - Product Change-Parcel Select Negotiated Service Agreement

    Science.gov (United States)

    2011-01-18

    ... POSTAL SERVICE Product Change--Parcel Select Negotiated Service Agreement AGENCY: Postal Service... INFORMATION: The United States Postal Service[reg] hereby gives notice that on December 23, 2010, it filed with the Postal Regulatory [[Page 2931

  11. Service Offering at Electrical Equipment Manufacturers

    Directory of Open Access Journals (Sweden)

    Lucie Kaňovská

    2015-09-01

    Full Text Available Purpose of the article: The aim of the paper is to uncover ways of managing service offering provided by electrical equipment manufactures in the Czech Republic. The segment is extremely important for Czech industry nowadays, especially because of many companies being subcontractors for the car industry and mechanical engineering. The producers of electric equipment comply with the Czech industry classification CZ-NACE 27. Methodology/methods: The questionnaire in the form of the Likert scale was prepared to gather information about customer services. The respondents were usually directors or managers, e.g. employees with high competencies of knowing customer services in this particular market. The total of 22 companies were included in the survey. Research was focused on the following industries classifications belonging to CZ-NACE 27: CZ-NACE 27, CZ-NACE 271 and CZ-NACE 273. According to Czech Statistical Office the total number of companies belonging to these 3 segments is 136. It means 16,2% companies belonging to CZ-NACE 27 participated in our research. Basic statistical methods were used to analyse the complete database. Scientific aim: The paper deals with the problem of service offering provided by today’s manufacturers. Global understanding of services that manufacturers really develop, sell, deliver and manage is still limited. Findings: Managing service offering provided by today‘s manufacturers shows that 1 Manufacturers not offer only tangible products, but also wide range of services and even information and support. 2 New products are not designed only according to company technicians, but also according to their customers. Their products and services are developed, tested and improved according to their needs. 3 Services provide complex customer care from time product selection to its end. Conclusions: Manufacturers of tangible products need to enlarge their product offering to be able to satisfy customers. Therefore

  12. 7 CFR 762.147 - Servicing shared appreciation agreements.

    Science.gov (United States)

    2010-01-01

    ... percent of any positive appreciation in the market value of the property securing the loan or line of... 7 Agriculture 7 2010-01-01 2010-01-01 false Servicing shared appreciation agreements. 762.147..., DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.147 Servicing shared appreciation...

  13. 22 CFR 226.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Property Standards § 226.34 Equipment. (a) Unless the agreement provides... to provide services to non-Federal outside organizations for a fee that is less than private...

  14. Alberta petroleum equipment and services directory, 1992

    International Nuclear Information System (INIS)

    1992-01-01

    A directory is presented of Alberta companies that provide equipment and services to the oil industry. In the main section, companies are listed alphabetically by name, along with their addresses, phone/fax numbers, contact personnel, and lists of products and/or services. A separate alphabetical name index and a product/service index are included. A section covering provincial and territorial government agencies and non-governmental associations and institutes is appended, giving name, address, phone/fax number, leading personnel, and a summary of activities

  15. 77 FR 28410 - Product Change-Parcel Select Negotiated Service Agreement

    Science.gov (United States)

    2012-05-14

    ... filed with the Postal Regulatory Commission a Request of the United States Postal Service to Add Parcel... POSTAL SERVICE Product Change--Parcel Select Negotiated Service Agreement AGENCY: Postal Service\\TM\\. ACTION: Notice. SUMMARY: The Postal Service gives notice of filing a request with the Postal...

  16. 78 FR 56248 - Product Change-Parcel Select Negotiated Service Agreement

    Science.gov (United States)

    2013-09-12

    ... POSTAL SERVICE Product Change--Parcel Select Negotiated Service Agreement AGENCY: Postal Service...: The United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632... States Postal Service to Add Parcel Select Contract 7 to Competitive Product List. Documents are...

  17. 77 FR 66193 - Product Change-Parcel Select Negotiated Service Agreement

    Science.gov (United States)

    2012-11-02

    ... POSTAL SERVICE Product Change--Parcel Select Negotiated Service Agreement AGENCY: Postal Service... United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3... Postal Service To Add Parcel Select Contract 6 to Competitive Product List. Documents are available at...

  18. 77 FR 42780 - Product Change-Parcel Select Negotiated Service Agreement

    Science.gov (United States)

    2012-07-20

    ... POSTAL SERVICE Product Change--Parcel Select Negotiated Service Agreement AGENCY: Postal Service... United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3... Postal Service to Add Parcel Select Contract 3 to Competitive Product List. Documents are available at...

  19. The General Agreement on Trade in Services

    Directory of Open Access Journals (Sweden)

    Francina Esteve García

    1995-07-01

    Full Text Available The conclusion of GATS and its inclusion as an annex in the constitutive Agreement of the World Trade Organization (WTO responds to the need for disposing of a stable juridical instrument which, given the current economic interdependence between States, can be applied to the international trade in services.One of the main new features of this agreement is its field of application given that it includes all service sectors (except those provided for in the name of governmental authorities and the four forms of carrying out trade in services and, as regards the principle of market access and that of national treatment, will be regulated according to those respective obligations which the Members have assumed.In exchange for not accepting the exclusion of any service sector, the negotiations concerning some fundamental sectors could not be totally closed and deadlines were extended in order to unblock the most controversial themes.One of the fundamental principles of the GATS is the most favoured nation clause of inconditional character but its consecration has been attenuated by the possibility of maintaining important exceptions in its application. The principle of transparency is also essential in the field of services, given that this sector is characterised by large public interventionism in access regulation and the exercise of the different economic activities which form it.The balance of the GATS is globally positive given that it includes a multilateral framework of principles and disciplines which is administered in the headquarters of the WTO, which have been accepted by a great majority of States within the international community and which remain subject to the WTO’s mechanism for the solution of differences.However, the opening of the market and the suppression of restrictions which derive from internal regulations have not been achieved given that, orientating itself around the objectives of national politics, liberalization is

  20. Services in Regioanl Trade Agreements: Implications for India

    OpenAIRE

    Nag, Biswajit; De, Debdeep

    2008-01-01

    Service sector has emerged as the largest and fastest-growing sector in the global economy in the last two decades, providing more than 60 per cent of global output and, in many countries, an even larger share of employment. The growth in services has also been accompanied by the rising share of services in world transactions. In fact trade in services has grown as fast as trade in goods in the period 1990- 2003 (6% per annum). In recent years the number of international agreements aiming to ...

  1. A Best Practice for Developing Availability Guarantee Language in Photovoltaic (PV) O&M Agreements.

    Energy Technology Data Exchange (ETDEWEB)

    Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Balfour, John [High Performance PV, Phoenix, AZ (United States)

    2015-11-01

    This document outlines the foundation for developing language that can be utilized in an Equipment Availability Guarantee, typically included in an O&M services agreement between a PV system or plant owner and an O&M services provider, or operator. Many of the current PV O&M service agreement Availability Guarantees are based on contracts used for traditional power generation, which create challenges for owners and operators due to the variable nature of grid-tied photovoltaic generating technologies. This report documents language used in early PV availability guarantees and presents best practices and equations that can be used to more openly communicate how the reliability of the PV system and plant equipment can be expressed in an availability guarantee. This work will improve the bankability of PV systems by providing greater transparency into the equipment reliability state to all parties involved in an O&M services contract.

  2. Exploring Service-led Growth Trajectories for Analytical Equipment Providers

    DEFF Research Database (Denmark)

    Raja, Jawwad; Frandsen, Thomas; Mouritsen, Jan

    2016-01-01

    This paper examines the dilemmas encountered by advanced analytical equipment providers in developing service-led growth strategies to expand their business in pursuit of more attractive revenue models. It does so by adopting a case based research approach. The findings detail the capabilities...... and solutions-in different contexts, with a view to expanding markets and developing solution based business models, are discussed. It is argued that analytical equipment providers encounter dilemmas as managing these different trajectories implies different needs in terms of the technological sophistication...... of equipment required. This does not necessarily imply that one context is less complex than the other, but rather suggests that the role of integration is qualitatively different and that the relationship between product and service varies when developing solutions in these different arenas....

  3. Security in Service Level Agreements for Cloud Computing

    OpenAIRE

    Bernsmed, Karin; JAATUN, Martin Gilje; Undheim, Astrid

    2011-01-01

    The Cloud computing paradigm promises reliable services, accessible from anywhere in the world, in an on-demand manner. Insufficient security has been identified as a major obstacle to adopting Cloud services. To deal with the risks associated with outsourcing data and applications to the Cloud, new methods for security assurance are urgently needed. This paper presents a framework for security in Service Level Agreements for Cloud computing. The purpose is twofold; to help potential Cloud cu...

  4. 10 CFR 434.404 - Building service systems and equipment.

    Science.gov (United States)

    2010-01-01

    ... requirements require 24-hour pump operation. 404.5.2Heated swimming pools shall be equipped with pool covers... 10 Energy 3 2010-01-01 2010-01-01 false Building service systems and equipment. 434.404 Section 434.404 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY CODE FOR NEW FEDERAL COMMERCIAL AND...

  5. The Text of the Project Agreement between the Agency and Argentina regarding Arrangements for the Transfer of Irradiation Equipment

    International Nuclear Information System (INIS)

    1969-01-01

    The text of the Project Agreement between the Agency and the Government of Argentina Regarding Arrangements for the Transfer of Irradiation Equipment is reproduced in this document for the information of all Members. The Agreement entered into force on 3 June 1969.

  6. The Text of the Project Agreement between the Agency and Mexico regarding Arrangements for the Transfer of Radiodiagnostic Equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-09-28

    The text of the Project Agreement between the Agency and the Government of Mexico Regarding Arrangements for the Transfer of Radiodiagnostic Equipment is reproduced in this document for the information of all Members. The Agreement entered into force on 18 August 1967.

  7. The Text of the Project Agreement between the Agency and Mexico regarding Arrangements for the Transfer of Radiodiagnostic Equipment

    International Nuclear Information System (INIS)

    1967-01-01

    The text of the Project Agreement between the Agency and the Government of Mexico Regarding Arrangements for the Transfer of Radiodiagnostic Equipment is reproduced in this document for the information of all Members. The Agreement entered into force on 18 August 1967

  8. Laboratory services series: an electrical outlet and corded equipment inspection program

    International Nuclear Information System (INIS)

    Davis, E.A.

    1976-04-01

    A research and development laboratory has thousands of electrical outlets providing power to laboratories, offices, shops, and service areas. These outlets provide power for a wide variety of portable equipment and tools that are equipped with cord and plug. Electric safety requires a periodic check of outlet grounding capability and continuing inspection and repair of corded equipment. Personnel, equipment, reports, procedures, and schedule requirements are reported

  9. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1990-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  10. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1987-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  11. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1988-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  12. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Tanaskovic, M.

    1995-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  13. The oil and gas equipment and services market in India

    International Nuclear Information System (INIS)

    2002-01-01

    In terms of purchasing power, India represents the fourth largest economy in the world. In the year April 1, 2001-Mar 31, 2002, it was estimated that India had a 5.4 per cent growth in gross domestic product (GDP). Canada experienced a 19.9 per cent increase in exports to India in 2001, reaching 656 million dollars. With the world's six-largest energy consumption, oil demand in India is expected to grow to 179 million tonnes in 2006-2007, while the demand for natural gas is expected to reach 231 million cubic metres per day in the same period. To meet this growing demand, India will require investments in the order of 150 billion dollars over the next 10 to 12 years. The oil and gas industry is being opened to the private sector and foreign direct investment, due to new government policies on exploration, production, distribution, and sales. Foreign involvement in exploration, previously restricted to Indian state-owned firms, is now allowed through the New Exploration Licensing Policy. In exploration and production (E and P) activities, as well as the refinery sector, foreign ownership of up to 100 per cent is now allowed. Two Indian companies which dominate the Indian E and P sector, namely Oil and Natural Gas Corporation (ONGC) and Oil India Limited (OIL), will be upgrading their ageing infrastructure, purchasing new equipment and redeveloping existing oil and gas fields, thereby creating opportunities for the supply of equipment and services. Canadian companies possessing the latest technologies and services in exploration, drilling machinery and equipment, directional drilling services, production machinery and equipment, enhanced recovery services, deep-water drilling equipment and services, and equipment for coal methane E and P should benefit from these opportunities. Over 12,000 kilometres of pipelines are being planned across India, as well as private opportunities in the refinery sector which was opened to the private sector in April 2002. Occasional

  14. [2011 Shanghai customer satisfaction report of DSA/X-ray equipment's after-service].

    Science.gov (United States)

    Li, Bin; Qian, Jianguo; Cao, Shaoping; Zheng, Yunxin; Xu, Zitian; Wang, Lijun

    2012-11-01

    To improve the manufacturer's medical equipment after-sale service, the fifth Shanghai zone customer satisfaction survey was launched by the end of 2011. The DSA/X-ray equipment was setup as an independent category for the first time. From the survey we can show that the DSA/X-ray equipment's CSI is higher than last year, the customer satisfaction scores of preventive maintenance and service contract are lower than others, and CSI of local brand is lower than imported brand.

  15. Purchasing Supplies, Equipment and Services Under EPA Grants

    Science.gov (United States)

    EPA developed this guidance to help ensure you meet EPA requirements when making such necessary purchases. With very few exceptions, you must follow a competitive process when you use EPA grant funds to acquire equipment and professional services.

  16. Electrical equipment service. 1997-1998; Service materiel electrique. 1997-1998

    Energy Technology Data Exchange (ETDEWEB)

    1997-12-31

    This brochure edited by the electrical equipment service from the direction of studies and researches (DER) of Electricite de France (EdF) presents some of their remarkable realizations in the domain of energy, their expertise activity in attendance on electricity producers, forwarders and distributors, their expertise activity in attendance on industrialists, and the know-how of their testing laboratories in attendance on designers and operators. (J.S.)

  17. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Karic, Z.

    2002-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. Activity plan for year 2002 is included [sr

  18. Government Procurement Agreements and Telecommunications Business

    Directory of Open Access Journals (Sweden)

    Shin-Won Kang

    2001-12-01

    Full Text Available The opening of the telecommunications market is acceleration due to the world trends of deregulation and privatization under the WTO basic telecommunications agreements. Diversification of services and fast and efficient equipment procurement are becoming necessary conditions for the survival of telecommunications operators. However, the issue here is that telecommunications operators are still bound by the GPA (Government Procurement Agreement based on conditions of monopoly even though the procurement market in Korean is open substantially since 1997. Under such conditions, the continued application of the GPA on telecommunications operator who is highly competitive may result in a negative impact on the telecommunications business and quality of telecommunications service by undermining the autonomy of operator and decreasing operator’s procurement competitiveness. Therefore, this study examines the GPA and the issues raised by the agreement, and also attempts to suggest revisions or means of abrogating the unfair GPA with regards to the development and deregulation of the telecommunications business.

  19. 76 FR 66666 - Basic Service Tier Encryption Compatibility Between Cable Systems and Consumer Electronics Equipment

    Science.gov (United States)

    2011-10-27

    ... 11-153] Basic Service Tier Encryption Compatibility Between Cable Systems and Consumer Electronics... substantially affect compatibility between cable service and consumer electronics equipment for most subscribers... problems between cable service and consumer electronics equipment were limiting and/or precluding the...

  20. 15 CFR 740.10 - Servicing and replacement of parts and equipment (RPL).

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS LICENSE EXCEPTIONS § 740.10 Servicing and replacement of parts and equipment (RPL). This License... replacement of equipment. (a) Parts—(1) Scope. The provisions of this paragraph (a) authorize the export and reexport of one-for-one replacement parts for previously exported equipment. (2) One-for-one replacement of...

  1. The Determination of Jurisdiction in Grid and Cloud Service Level Agreements

    Science.gov (United States)

    Parrilli, Davide Maria

    Service Level Agreements in Grid and Cloud scenarios can be a source of disputes particularly in case of breach of the obligations arising under them. It is then important to determine where parties can litigate in relation with such agreements. The paper deals with this question in the peculiar context of the European Union, and so taking into consideration Regulation 44/2001. According to the rules on jurisdiction provided by the Regulation, two general distinctions are drawn in order to determine which (European) courts are competent to adjudicate disputes arising out of a Service Level Agreement. The former is between B2B and B2C transactions, and the latter regards contracts which provide a jurisdiction clause and contracts which do not.

  2. The oil and gas equipment and services market in Nigeria

    International Nuclear Information System (INIS)

    2003-01-01

    The oil and gas market in Nigeria is being expanded by the Nigerian government over the 2003-2010 period through increased exploration and production (E and P) in new areas. Other measures being implemented are the improvements of structural flaws that hamper industry growth, the modernization of the weak downstream sector, and attempts to attract foreign investment and technologies required for petroleum development. In 2001, it was estimated that the market for oil and gas equipment in Nigeria was approximately 1.03 billion dollars, and is expected to reach 1.15 billion dollars in 2002. In deep-sea areas, major offshore E and P projects are being planned by large oil multinationals. The implementation of several gas-related E and P operations and major liquefied natural gas (LNG) and gas-to-liquid (GTL) projects are being supported by the government of Nigeria to develop the natural gas sector. Onshore and offshore exploration, surveying and geophysical prospecting, drilling equipment, facilities maintenance, deepwater E and P, equipment for LNG/GTL facilities, enhanced recovery equipment and services, gas re-injection technology, pipelines, and the refinery sector are all areas where Canadian equipment and service suppliers could benefit from opportunities in Nigeria. One of the most prominent foreign player in the Nigerian market is Royal Dutch Shell. As far as the offshore deepwater E and P sub-sector, the three major players are Shell, ChevronTexaco, and ExxonMobil. The Nigerian government advocate in upstream and downstream oil industries in the country is Nigeria National Petroleum Corporation (NNPC). The primary domestic end-users of oil and gas equipment and services are member companies of the Nigerian Association of Indigenous Petroleum Exploration Companies (NAIPEC). Canadian companies are encouraged to form joint venture partnerships in oil and gas projects, as foreign majors operating in Nigeria tend to rely on the skills and expertise of foreign

  3. 75 FR 42486 - Financial Management Service; Proposed Collection of Information: Authorization Agreement for...

    Science.gov (United States)

    2010-07-21

    ... DEPARTMENT OF THE TREASURY Fiscal Service Financial Management Service; Proposed Collection of Information: Authorization Agreement for Preauthorized Payment (SF 5510) AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice and request for comments. SUMMARY: The Financial Management...

  4. Technology review of commercial food service equipment - final report

    Energy Technology Data Exchange (ETDEWEB)

    Rahbar, S; Krsikapa, S [Canadian Gas Research Inst., Don Mills, ON (Canada); Fisher, D; Nickel, J; Ardley, S; Zabrowski, D [Fisher Consultants (Canada); Barker, R F [ed.

    1996-05-15

    Technical information on commercial gas cooking appliances was presented. This second volume provided an appliance-by-appliance comprehensive assessment of the energy performance of commercial food service equipment. Energy assessments were made for the following categories of cooking equipment: fryers, griddles, broilers, ranges, Chinese ranges, ovens, steamers, steam kettles, and braising pans. Recommendations were made for improving the energy efficiency and overall performance of gas appliances to support of the Canadian gas utilities marketing and energy conservation initiatives. 71 refs., 37 tabs., 58 figs.

  5. Health care agreements as a tool for coordinating health and social services

    Directory of Open Access Journals (Sweden)

    Andreas Rudkjøbing

    2014-12-01

    Full Text Available Introduction: In 2007, a substantial reform changed the administrative boundaries of the Danish health care system and introduced health care agreements to be signed between municipal and regional authorities. To assess the health care agreements as a tool for coordinating health and social services, a survey was conducted before (2005–2006 and after the reform (2011.Theory and methods: The study was designed on the basis of a modified version of Alter and Hage's framework for conceptualising coordination. Both surveys addressed all municipal level units (n = 271/98 and a random sample of general practitioners (n = 700/853.Results: The health care agreements were considered more useful for coordinating care than the previous health plans. The power relationship between the regional and municipal authorities in drawing up the agreements was described as more equal. Familiarity with the agreements among general practitioners was higher, as was the perceived influence of the health care agreements on their work.Discussion: Health care agreements with specific content and with regular follow-up and systematic mechanisms for organising feedback between collaborative partners exemplify a useful tool for the coordination of health and social services.Conclusion: There are substantial improvements with the new health agreements in terms of formalising a better coordination of the health care system.

  6. 77 FR 67290 - Basic Service Tier Encryption Compatibility Between Cable Systems and Consumer Electronics Equipment

    Science.gov (United States)

    2012-11-09

    ...-126] Basic Service Tier Encryption Compatibility Between Cable Systems and Consumer Electronics... between consumer electronics equipment (such as digital television sets) and newly encrypted cable service... Act''), Congress sought to make sure that consumer electronics equipment could receive cable...

  7. The Text of the Project Agreement between the Agency and Afghanistan regarding Arrangements for the Transfer of Therapeutic Irradiation Equipment

    International Nuclear Information System (INIS)

    1966-01-01

    The text of the Project Agreement between the Agency and Afghanistan Regarding Arrangements for the Transfer of Therapeutic Irradiation Equipment is reproduced in this document for the information of all Members

  8. 76 FR 17787 - Market Dominant Negotiated Service Agreement (NSA) for First-Class Mail and Standard Mail

    Science.gov (United States)

    2011-03-31

    ... POSTAL SERVICE 39 CFR Part 111 Market Dominant Negotiated Service Agreement (NSA) for First- Class....1, to establish a new Negotiated Service Agreement (NSA) Market Dominant product for First-Class... Gifford at 202-268-8082. SUPPLEMENTARY INFORMATION: This new NSA for First-Class Mail and Standard Mail is...

  9. Tax effect of the concession agreement, production sharing agreement and service contract; Analise dos efeitos tributarios dos contratos de concessao, partilha de producao e servicos

    Energy Technology Data Exchange (ETDEWEB)

    Botelho, Rodrigo Jacobina [Escola de Magistratura do Tribunal de Justica do Estado do Rio de Janeiro (EMERJ), RJ (Brazil); Instituicao de Ensino Superior no Estado do Rio de Janeiro, RJ (Brazil); Escritorio Doria, Jacobina, Rosado e Gondinho Advogados Associados, Rio de Janeiro, RJ (Brazil). Area de Direito Tributario

    2008-07-01

    The different nature of the E and P agreements recommends an analysis of the tax incidence in order to avoid the increasing of costs due to an inaccurate taxation process. The revenue obtained from Services Agreements must be, under the Brazilian legal system, taxed as the revenues obtained from the Concession Agreements, since those revenues are related to the risks supported, the investments and financial exposure, among others elements and not related to a specific public service provided. (author)

  10. Privacy Management Contracts And Economics, Using Service Level Agreements (Sla)

    NARCIS (Netherlands)

    L-F. Pau (Louis-François)

    2005-01-01

    textabstractRecognizing the importance of privacy management as a business process and a business support process, this paper proposes the use of service level agreements around privacy features, including qualitative and quantitative ones. It also casts privacy management into a business

  11. Restoration to serviceability of Bruce 'A' heat transfer equipment

    International Nuclear Information System (INIS)

    Gammage, D.; Machowski, C.; McGillivray, R.; Durance, D.; Kazimer, D.; Werner, K.

    2009-01-01

    Bruce Units 1 to 4 were shut down during the 1990s by the former Ontario Hydro, due in part to a long list of system and equipment deficiencies and concerns, including steam generator tube degradation as a consequence of the then-existing steam generator secondary side water chemistry conditions. Upon its creation in 2001, and following a program of condition assessment, Bruce Power was able to determine that Units 3 and 4 could return to service; but that Units 1 and 2 would require refurbishment. That Refurbishment Program, which is currently well advanced, included the re-assessment of the condition of equipment throughout the plant including the heat transfer equipment; and determination item-by-item as to what inspection, cleaning, repair, or even replacement would be required to put the equipment into a condition where it could be expected to operate reliably for the additional 30 years expected from the plant. Clearly the objective is to suitably restore the equipment to serviceability without doing more refurbishment work than is warranted - without replacing equipment except where absolutely necessary. The first task in such a program is determination of its scope - i.e. a listing of all heat exchangers. That list included everything from the steam generators (which required replacement, now completed), to much smaller heat exchangers in the heavy water upgrader systems (which were found to be in very good overall condition). There is also a very large number of other so-called 'balance-of-plant' heat exchangers; these include the maintenance coolers, moderator heat exchangers, shutdown coolers and a whole raft of smaller coolers - many of which are cooled directly by lake water with its potential for bio-fouling and 'BIC' (Biologically Induced Corrosion). This paper focuses primarily on the engineering assessment, inspection, repair and general refurbishment of the balance-of-plant heat exchangers. As will be discussed in the paper, the assessment of the

  12. Parents were accurate proxy reporters of urgent pediatric asthma health services: a retrospective agreement analysis.

    Science.gov (United States)

    Ungar, Wendy J; Davidson-Grimwood, Sara R; Cousins, Martha

    2007-11-01

    To assess agreement between parents' proxy reports of children's respiratory-related health service use and administrative data. A retrospective analysis of statistical agreement between clinical and claims data for reports of physician visits, emergency department (ED) visits, and hospitalizations in 545 asthmatic children recruited from sites in the greater Toronto area was conducted. Health services use data were extracted from the Ontario Health Insurance Plan and Canadian Institute for Health Information databases for each child for the interval coinciding with the proxy report for each health service type. Agreement between administrative data and respondent reports (n=545) was substantial for hospitalizations in the past year (kappa=0.80 [0.74, 0.86]), moderate for ED visits in the past year (kappa=0.60 [0.53, 0.67]), and slight for physician visits (kappa=0.13 [0.00, 0.27]) in the past 6 months. Income, parent's education, and child quality-of-life symptom scores did not affect agreement. Agreement for ED visits was significantly higher (Pasthma attack in the past 6 months (kappa=0.61 [0.54, 0.68]) compared to children who did not (kappa=0.25 [0.00, 0.59]). Parents of asthmatic children are reliable reporters of their child's respiratory-related urgent health services utilization.

  13. Growing a Technology Equipment Service in an Academic Library

    Science.gov (United States)

    Anderson, Sean; Weatherbee, Sue

    2012-01-01

    The 21st-century student is highly technological. In order to encourage and enable the technologically advanced students, the authors wanted to develop a technology equipment service in the library at Texas A&M University-Commerce. They had an idea of what they wanted to accomplish but were unsure of how to get started. They started a small…

  14. Virtual age model for equipment aging plant based on operation environment and service state

    International Nuclear Information System (INIS)

    Zhang Liming; Cai Qi; Zhao Xinwen; Chen Ling

    2010-01-01

    The accelerated life model based on the operation environment and service state was established by taking the virtual age as the equipment aging indices. The effect of different operation environments and service states on the reliability and virtual age under the continuum operation conditions and cycle operation conditions were analyzed, and the sensitivities of virtual age on operational environments and service states were studied. The results of the example application show that the effect of NPP equipment lifetime and the key parameters related to the reliability can be quantified by this model, and the result is in accordance with the reality.(authors)

  15. 7 CFR 58.46 - Fees for service performed under cooperative agreement.

    Science.gov (United States)

    2010-01-01

    ... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT... provided for by such agreement. Marking, Branding, and Identifying Product ...

  16. The Mexican market for electrical equipment and services

    International Nuclear Information System (INIS)

    Robinson, J.

    1994-05-01

    Most of Mexico's electric power needs are supplied by the Comision Federal de Electricidad (CFE). Total installed capacity is ca 33,000 MW, of which ca 42% comes from oil-fired generation and 26% hydroelectric. Electricity consumption is expected to grow at ca 6%/y between 1993 and 2000; to meet this demand, CFE plans to build nearly 14,000 MW of additional generating capacity to cost ca $34 billion. A new law governing the electric power sector recently privatized electrical project construction and provided for private financing. Construction of all larger generation and transmission projects has been privatized, thereby deregulating and simplifying the bidding process for Canadian firms wishing to bid, subcontract, or supply equipment or materials. The most notable opportunities for Canadian firms are in transmission projects. The Mexican electrical manufacturing industry comprises ca 2,000 firms employing 150,000 people. Branch plants of global firms plus domestic companies supply over 70% of market demand. Production of equipment and materials for the electrical sector is well integrated with suppliers and customers, and manufacturers are seeking imports to replace abandoned product lines as the industry rationalizes. These, along with more sophisticated equipment not made in Mexico, provide opportunities for Canadian suppliers. The North American Free Trade Agreement gives preference to Canadians over offshore competitors, and eliminates many barriers to exports. Canada's Export Development Corporation provides financing with a line of credit for the electrical sector. Marketing in Mexico is best done through personal visits and capable local representation. A directory of Mexican electrical manufacturers who import is appended. 1 tab

  17. Service for maintenance of electronic equipment of the RA reactor, Report for 1977 - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1977-01-01

    This report describes the tasks and organizational structure of the Service for maintenance of electronic equipment of the RA reactor. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment related to the experimental devices [sr

  18. Opportunities of Trade in Services between the EU and Ukraine: the Case of Telecommunications Services under the GATS and the Association Agreement

    DEFF Research Database (Denmark)

    Batura, Olga; Kretova, Olga A.

    This working paper studies the legal and regulatory conditions for trade in ser- vices between the European Union (EU) and Ukraine on the example of tele- communications services that are important carrier services for various busi- ness activities in the cross-border trade. The paper outlines...... the general frame- work for trade in services under the GATS as expressed in the commitments undertaken by Ukraine and examines the detailed provisions of the EU- Ukraine Association Agreement on trade liberalisation and regulatory approx- imation that is a WTO-extra agreement. It also provides an overview...... – the internal mar- ket treatment – is difficult to reach due to unclear and complicated rules on regulatory approximation. Key words: EU, Ukraine, trade in services, telecommunications services, liber- alisation, regulatory approximation...

  19. Pembuatan Service Level Requirement, Service Level Agreement dan Operational Level Agreement pada layanan help desk SAP berdasarkan kerangka kerja ITIL versi 2011 (Studi Kasus : Pupuk Indonesia Holding Company

    Directory of Open Access Journals (Sweden)

    Nur Shabrina Prameswari

    2017-01-01

    Full Text Available PT. Pupuk Indonesia Holding Company baru saja melakukan implementasi SAP pada tahun 2014. Dalam penerapannya, perusahaan merasa perlu membuat help desk SAP sebagai pusat penanganan masalah bagi perusahaan dan 7 anak perusahaannya yang kemudian dapat berfungsi juga sebagai knowledge base yang berguna apabila ada masalah yang berulang diwaktu selanjutnya. Untuk merancang layanan help desk yang baik, perlu didefinisikannya target layanan dalam sebuah kontrak perjanjian antara pengguna layanan dan penyedia layanan. Selain itu,Perjanjian layanan tersebut diperlukan juga sebagai jaminan kualitas help desk yang dapat disepakati oleh penyedia layanan dan pengguna layanan yang merupakan pengguna SAP pada PT. Pupuk Indonesia dan anak perusahaannya. Hal tersebut bertujuan untuk menyelaraskan bisnis dengan kualitas layanan serta menentukan kebutuhan dan harapan pelanggan dalam sebuah perjanjian antara penyedia layanan dan pengguna layanan. Dari permasalahan tersebut, maka diperlukan pembuatan dokumen Service Level Requirement, Service Level Agreement dan juga Operational Level Agreement pada help desk SAP, dengan dilakukan observasi dokumen dan wawancara pada pihak pengguna layanan dan penyedia layanan, maka setelah itu dibuatlah dokumen Service Level management tersebut berdasarkan ITIL Versi 2011.

  20. Energy service agreement as a tool of the program implementation aimed at raising of energy efficiency: challenges and opportunities

    Directory of Open Access Journals (Sweden)

    Tupikina Anastasia

    2016-01-01

    Full Text Available In this article relevance of energy service agreement as a tool of energy efficiency raising has been proved. On the basis of analysis of researches aimed at energy service agreements, legislative base and procedural framework, examples of implementation of energy service agreements the key challenges have been defined, slowing down the development of energy services market in Russia. Possible ways of solving these problems have been shown and the necessity of complex approach to dealing with these issues has been drawn.

  1. Evaluation of Service Level Agreement Approaches for Portfolio Management in the Financial Industry

    Science.gov (United States)

    Pontz, Tobias; Grauer, Manfred; Kuebert, Roland; Tenschert, Axel; Koller, Bastian

    The idea of service-oriented Grid computing seems to have the potential for fundamental paradigm change and a new architectural alignment concerning the design of IT infrastructures. There is a wide range of technical approaches from scientific communities which describe basic infrastructures and middlewares for integrating Grid resources in order that by now Grid applications are technically realizable. Hence, Grid computing needs viable business models and enhanced infrastructures to move from academic application right up to commercial application. For a commercial usage of these evolutions service level agreements are needed. The developed approaches are primary of academic interest and mostly have not been put into practice. Based on a business use case of the financial industry, five service level agreement approaches have been evaluated in this paper. Based on the evaluation, a management architecture has been designed and implemented as a prototype.

  2. The oil and gas equipment and services market in New Zealand

    International Nuclear Information System (INIS)

    2002-01-01

    In terms of petroleum exploration investment, New Zealand ranks seventeenth in the world. The oil, gas, and petrochemical industry is mainly concentrated in Taranaki, a province where considerable onshore and offshore exploration and production (E and P) activity is taking place. The largest licensing round in the petroleum industry of New Zealand was recently completed, with 41 applications emanating from 21 companies were submitted, related to 26 new exploration blocks located onshore and frontier Taranaki basin. Starting in 2007, New Zealand is expected to suffer from a natural gas shortfall due to the gradual depletion of the main natural gas field called Maui. As a result, the development of the Pohokura project is being afforded top priority. In 2002, in the province of Taranaki, it is expected that 125 million dollars will be spent in support of exploration activity. The areas of oil and gas exploration such as seismic surveying services, geophysical services, drilling, monitoring and logging, and field management technologies represent potential opportunities for Canadian companies specialized in the provision of oil and gas equipment and services. For the period 2002-2005, New Zealand is planning significant offshore deep-water E and P projects with a view to ensure a secure supply of natural gas. The largest domestic oil and gas E and P company in New Zealand is Todd Petroleum Mining Company, while the largest foreign-owned oil and gas production company operating in the country is Shell Petroleum Mining Company. Responsible for over 90 per cent of oil and gas production, the largest joint oil service company in New Zealand is Shell Todd Oil Service (STOS), 50 per cent owned by Shell Petroleum Mining Company and 50 per cent by Todd Petroleum Mining Company. Canadian equipment and services might be particularly well received by companies such as STOS and Natural Gas Corporation. Partners in oil and gas projects are sought by companies such as Shell. Higher

  3. An intelligent service matching method for mechanical equipment condition monitoring using the fibre Bragg grating sensor network

    Science.gov (United States)

    Zhang, Fan; Zhou, Zude; Liu, Quan; Xu, Wenjun

    2017-02-01

    Due to the advantages of being able to function under harsh environmental conditions and serving as a distributed condition information source in a networked monitoring system, the fibre Bragg grating (FBG) sensor network has attracted considerable attention for equipment online condition monitoring. To provide an overall conditional view of the mechanical equipment operation, a networked service-oriented condition monitoring framework based on FBG sensing is proposed, together with an intelligent matching method for supporting monitoring service management. In the novel framework, three classes of progressive service matching approaches, including service-chain knowledge database service matching, multi-objective constrained service matching and workflow-driven human-interactive service matching, are developed and integrated with an enhanced particle swarm optimisation (PSO) algorithm as well as a workflow-driven mechanism. Moreover, the manufacturing domain ontology, FBG sensor network structure and monitoring object are considered to facilitate the automatic matching of condition monitoring services to overcome the limitations of traditional service processing methods. The experimental results demonstrate that FBG monitoring services can be selected intelligently, and the developed condition monitoring system can be re-built rapidly as new equipment joins the framework. The effectiveness of the service matching method is also verified by implementing a prototype system together with its performance analysis.

  4. Supply of equipment and components, materials of dedicated commercial grade, other services

    International Nuclear Information System (INIS)

    Perdices, D.; Perez Medina, E.

    2014-01-01

    The following article describes the course of action of Tecnatom as Procurement Agent and Manufacturing Manager for the supply materials, equipment and components for the Spanish Nuclear Power Plants. We have devoted a special mention to the supply of dedicated commercial grade items (CGI), bringing together the services of Manufacturing Manager, Engineering service and testing facilities, simplifying the control of the supply chain with total warranty. (Author)

  5. 47 CFR 76.923 - Rates for equipment and installation used to receive the basic service tier.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Rates for equipment and installation used to... § 76.923 Rates for equipment and installation used to receive the basic service tier. (a) Scope. (1... control units; and (iii) Inside wiring. (2) Subscriber charges for such equipment shall not exceed charges...

  6. 38 CFR 17.142 - Authority to approve sharing agreements, contracts for scarce medical specialist services and...

    Science.gov (United States)

    2010-07-01

    ... sharing agreements, contracts for scarce medical specialist services and contracts for other medical... medical specialist services and contracts for other medical services. The Under Secretary for Health is... specialist services at Department of Veterans Affairs health care facilities (including, but not limited to...

  7. Services procurement under the WTO’s agreement on government procurement: whither market access?

    OpenAIRE

    Shingal, Anirudh

    2010-01-01

    This paper studies the government procurement of services from foreign suppliers by conducting a statistical analysis of data submitted by Japan and Switzerland to the WTO's Committee on Government Procurement. Using several metrics, the paper examines if the WTO’s Agreement on Government Procurement (GPA) has led to greater market access for foreign suppliers in services procurement. Our results indicate that despite the GPA, the proportions of services contracts awarded to foreigners have d...

  8. 48 CFR 252.239-7016 - Telecommunications security equipment, devices, techniques, and services.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Telecommunications... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions And Clauses 252.239-7016 Telecommunications... clause: Telecommunications Security Equipment, Devices, Techniques, and Services (DEC 1991) (a...

  9. The role of veterinary epidemiology and veterinary services in complying with the World Trade Organization SPS agreement.

    Science.gov (United States)

    Zepeda, C; Salman, M; Thiermann, A; Kellar, J; Rojas, H; Willeberg, P

    2005-02-01

    The agreement on the application of sanitary and phytosanitary measures (SPS agreement) was one of the major products of the GATT's Uruguay round of multilateral trade negotiations, signed in Marrakesh on 15 April 1994. This agreement and others are part of the treaty that established the World Trade Organization (WTO). The WTO superseded the GATT as the umbrella organization for international trade (WTO, 1998a). The SPS agreement's main intent is to provide guidelines and provisions to member countries to facilitate trade while taking measures to protect human, animal or plant life or health. The agreement dictates that all sanitary measures must be scientifically based and not more restrictive than required to avoid the risk identified. The agreement recommends the use of international standards from the World Organization for Animal Health (OIE), Codex Alimentarius (CAC) and the International Plant Protection Convention (IPPC) as the basis for import requirements. If a country chooses to apply more restrictive measures than those in the international standards, it has to justify its position through a risk analysis, thus avoiding the use of sanitary and phytosanitary measures as unjustified barriers to trade. More than ever, veterinary services worldwide are faced with having to fulfill a crucial role in protecting their country's animal health status, provide sound surveillance information on the occurrence of diseases within their territories, and conduct scientifically valid risk analyses to establish justified import requirements. During the past two decades, most countries have experienced resource reduction in their veterinary services. The effect of these policies has been severe, in many cases leading to an inability of veterinary services to conduct their disease prevention and control duties. There is a clear inconsistency between the demands placed on veterinary services and the current level of funding and support they are receiving, particularly in

  10. The Relative Patient Costs and Availability of Dental Services, Materials and Equipment in Public Oral Care Facilities in Tanzania.

    OpenAIRE

    Nyamuryekung'e, Kasusu K; Lahti, Satu M; Tuominen, Risto J

    2015-01-01

    Background Patient charges and availability of dental services influence utilization of dental services. There is little available information on the cost of dental services and availability of materials and equipment in public dental facilities in Africa. This study aimed to determine the relative cost and availability of dental services, materials and equipment in public oral care facilities in Tanzania. The local factors affecting availability were also studied. Methods A survey of all dis...

  11. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  12. Optimal Medical Equipment Maintenance Service Proposal Decision Support System combining Activity Based Costing (ABC) and the Analytic Hierarchy Process (AHP).

    Science.gov (United States)

    da Rocha, Leticia; Sloane, Elliot; M Bassani, Jose

    2005-01-01

    This study describes a framework to support the choice of the maintenance service (in-house or third party contract) for each category of medical equipment based on: a) the real medical equipment maintenance management system currently used by the biomedical engineering group of the public health system of the Universidade Estadual de Campinas located in Brazil to control the medical equipment maintenance service, b) the Activity Based Costing (ABC) method, and c) the Analytic Hierarchy Process (AHP) method. Results show the cost and performance related to each type of maintenance service. Decision-makers can use these results to evaluate possible strategies for the categories of equipment.

  13. Power Product Equipment Technician: Outboard-Engine Systems and Service. Teacher Edition [and] Student Edition.

    Science.gov (United States)

    Hilley, Robert

    This curriculum guide contains teacher and student materials for a course on outboard-engine boat systems and service for power product equipment technician occupations. The course contains the following four units of instruction: (1) Outboard-Engine Design and Identification; (2) Operation and Service of Engine-Support Systems; (3) Operation and…

  14. Exploring the Managerial Dilemmas Encountered by Advanced Analytical Equipment Providers in Developing Service-led Growth Strategies

    DEFF Research Database (Denmark)

    Raja, Jawwad; Frandsen, Thomas; Mouritsen, Jan

    2017-01-01

    This paper examines the dilemmas encountered by manufacturers of advanced analytical equipment in developing service-led growth strategies to expand their business in pursuit of more attractive revenue models. It does so by adopting a case-based research approach. The findings detail the challenges...... faced in providing advanced services to customers’ R & D functions, while simultaneously attempting to scale up these services for a production context. The emergent complexities of operating in multiple arenas in order to explore and exploit technologies in different contexts—along the three...... trajectories of serviceability, scalability and solutions—with a view to expanding markets and developing solution-based business models, are discussed. It is argued that manufacturers of analytical equipment encounter certain dilemmas, as managing the different trajectories involves different needs...

  15. Fairness as a QoS Measure for Web Services

    Directory of Open Access Journals (Sweden)

    Stefano Bistarelli

    2009-06-01

    Full Text Available Service Oriented Architectures (SOAs are component-based architectures, characterized by reusability, modularization and composition, usually offered by HTTP (web services and often equipped with a Quality of Services (QoS measure. In order to guarantee the fairness property to each client requesting a service, we propose a fair version of the (Soft Concurrent Constraint language to deal with the negotiation phases of the Service Level Agreement (SLA protocol.

  16. Jane Kelsey, Serving Whose Interests? The Political Economy of Trade in Services Agreements

    Directory of Open Access Journals (Sweden)

    Maureen Irish

    2009-02-01

    Full Text Available Serving Whose Interests is an examination of the General Agreement on Trade in Services [GATS] since its inception in 1995, with several case studies that discuss services trade in specific applications around the world. The scholarship i s extensive and detailed. Jane Kelsey, law professor at the University of Auckland, has criticized the pro-market services trade regime i n her role as a political activist. In this book, her goals are to make the technicalities of trade rules accessible and to show their effects on people and communities.

  17. Commercial Best Practices in Contracting for Knowledge-Based and Equipment-Related Services

    Science.gov (United States)

    2015-08-01

    January 12, 2015, http://news.thomasnet.com/imt /2014/09/04/why-accenture-thinks-it-can- rattle-ibm-in-plm. 33 Sean Broderick , “North American Re...Services-Using-Predictive-Analytics-to-Increase-Equipment-Reliability-and- Reduce-Costs.pdf. Aviation Week Intelligence Network. Sean Broderick . “North

  18. The improvement of maintenance service for traction networks equipment on the base of process approach

    Directory of Open Access Journals (Sweden)

    D. V. Mironov

    2014-12-01

    Full Text Available Purpose. The new methods development for improving the maintenance service for equipment of traction networks in order to increase its efficiency and quality. Methodology. In world practice of solving problems related to the quality of products and services is usually achieved by introducing quality management system in to the enterprises. The provisions of quality management system were used for solving the problem. The technologies of process engineering were used for describing the main stages of maintenance service. Findings. The development of high-speed movement and growth of its intensity, the use of electric rolling stock of a new generation require the introduction of new methods diagnostics of equipment technical state and improvement of the existing maintenance system and repair of power supply. Developing a model of business-processes, their optimization with using techniques of process engineering and system management is needed for the transition to the management system based on the process approach. From the standpoint of the process approach and in accordance with the requirements of the quality management system (ISO 9001-2009, the operation of the E (Department of electrification and power supply infrastructure sector is represented as a scheme of business-processes in which the guaranteed supply with electricity of railway and third-party consumers is defined as the main business-process of management. Each of the sub-process of power supply for consumers is described in details. The use methods and main stages of process approach for sample management system reorganization were investigated. The methodology and the application method of PDCA (Plan-Do-Check-Act closed loop to the equipment maintenance system were described. The monitoring process of traction networks maintenance using the process approach was divided into components after investigations. The technical documentation of maintenance service was investigated in

  19. Fitness-for-service and decisions for petroleum and chemical equipment. PVP-Volume 315

    International Nuclear Information System (INIS)

    Prager, M.; Becht, C. IV; Depadova, T.A.; Okazaki, M.; Onyewuenyi, O.A.; Smith, J.P.; Takezono, S.; Weingart, L.J.; Yagi, K.

    1995-01-01

    This volume is part of a series of publications intended to present the technical foundation for broadly accepted practices to establish the mechanical integrity of equipment in service. A focal point for this activity has been a Materials Properties Council program on fitness-for-service (FSS) reported in earlier PVP volumes. Work reported here covers the full range of equipment of interest to petroleum and chemical companies from LNG to creep service and provides a snapshot of current Codes, methods, concerns, and problems. It encompasses crack-like flaws and local thinning situations, welds, clad vessels, storage tanks, and pressure vessels. The work in progress is only a start, and the papers herein should be viewed as part of the process of validating the techniques used. While most of the applications are to petroleum refineries and natural gas processing plants, some papers deal with fossil-fuel power plants, nuclear power plants, synthetic fuels refineries, and materials for high-temperature applications. Papers have been processed separately for inclusion on the data base

  20. 47 CFR 76.930 - Initiation of review of basic cable service and equipment rates.

    Science.gov (United States)

    2010-10-01

    ... rates for the basic service tier and associated equipment with a franchising authority within 30 days of receiving written notification from the franchising authority that the franchising authority has been...

  1. Activity of the Service for maintenance of the electronic equipment of the RA reactor in 1976, report - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1976-01-01

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system [sr

  2. Investments for medical equipment in a mother and child health hospital: correlation with level of services/departments.

    Science.gov (United States)

    Trevisanuto, Daniele; Raggi, Roberto; Bavuusuren, Bayasgalantai; Tudevdorj, Erkhembaatar; Doglioni, Nicoletta; Zanardo, Vincenzo

    2011-02-01

    To assess whether investments for medical equipments assigned by a team of experts to a mother and child health hospital located in Mongolia were correlated with structural, organizational, and educational level of its services/departments. A score was used for evaluating the level of each service/department. It was based on a 'structural area' and an 'organizational and educational area'. Destination of funds was determined by a team of experts in collaboration with the head of the service/department. Thirty-three of 36 services/departments (91.6%) were evaluated. A total sum of 4,432,140 Euros to invest in medical equipment was estimated. Assigned investments were inversely correlated with the total (structural plus organizational and educational area) score (n = 33; r =  -0.59; p = 0.0002), and the specific scores for structural area (n = 33; r = -0.46; p = 0.005) and organizational and educational area (n = 33; r =  -0.56; p = 0.0006). A large part of the funds for medical equipment was destined to services/departments with low organizational and educational conditions, limiting the potential effect of the aid meanwhile supporting the most in need departments. Educational efforts and monitoring of specific long-term indicators are mandatory.

  3. 76 FR 4393 - Discover Financial Services Negotiated Service Agreement

    Science.gov (United States)

    2011-01-25

    ... filed six attachments as follows: Attachment A--a copy of Governors' Resolution No. 11-2, authorizing a... initiation of the agreement) for all qualifying pieces. For Standard Mail, the rebate will be equal to 37.5... Standard Mail prices in existence at the initiation of the agreement) for all qualifying pieces. Id. at 4...

  4. "Trade creep" and implications of the Transatlantic Trade and Investment Partnership Agreement for the United Kingdom National Health Service.

    Science.gov (United States)

    Koivusalo, Meri; Tritter, Jonathan

    2014-01-01

    The ambitious and comprehensive Transatlantic Trade and Investment Partnership Agreement (TTIP/TAFTA) agreement between the European Union and United States is now being negotiated and may have far-reaching consequences for health services. The agreement extends to government procurement, investment, and further regulatory cooperation. In this article, we focus on the United Kingdom National Health Service and how these negotiations can limit policy space to change policies and to regulate in relation to health services, pharmaceuticals, medical devices, and health industries. The negotiation of TTIP/TAFTA has the potential to "harmonize" more corporate-friendly regulation, resulting in higher costs and loss of policy space, an example of "trade creep" that potentially compromises health equity, public health, and safety concerns across the Atlantic.

  5. Technology review of commercial food service equipment - final report

    Energy Technology Data Exchange (ETDEWEB)

    Rahbar, S; Krsikapa, S [Canadian Gas Research Inst., Don Mills, ON (Canada); Fisher, D; Nickel, J; Ardley, S; Zabrowski, D [Fisher Consultants (Canada); Barker, R F [ed.

    1996-05-15

    Market and technical information on gas fired equipment used in the commercial food service sector in Canada and in each province or territory was presented. Results of a market study and technology review were integrated to establish energy consumption and energy saving potential in this sector. Eight categories of commercial cooking appliances were studied. They were: fryers, griddles, broilers, ranges, ovens, tilting skillets, steam kettles and steamers. Focus was on gas fired appliances, although electric appliances were also included. The total energy consumption of the appliances was estimated at 76,140.37 GBtu in 1994. Gas appliances accounted for 63 per cent of the total inventory and consumed 83 per cent of the total energy used. Cooking energy efficiencies for the gas fired commercial cooking equipment ranged from 10 per cent to 60 per cent. The electric appliances had cooking energy efficiencies ranging from 35 per cent to 95 per cent. A list of recommendations were made for the many opportunities to introduce higher efficiency commercial cooking appliances, essential to slow down or to stabilize the energy consumption of cooking appliances over the next decade. 66 refs., 14 tabs., 18 figs.

  6. Features of the Maintenance Agreement (Contract for the Delivery of Goods, Works and Services for State and Municipal Needs

    Directory of Open Access Journals (Sweden)

    Evgeniya V. Loginova

    2015-12-01

    Full Text Available Article analyzes main features of the agreement (contract for the delivery of goods, works and services for state and municipal needs. It is shown that civil-legal nature of this agreement, which aims to meet the public interest. It is emphasized that this agreement is the special subject composition. Features of this type of contract, which is manifested in the use of special methods of placing state and municipal orders are shown. It is proved that for the public contract subject of the contract will depend on the considered whether the supply agreement or service contract. Existing in the modern civil law doctrine approaches to understanding the essential terms of the contract are analyzed. Features of pricing in this agreement is shown. It was concluded that, in contrast to other types of civil contracts, state contract has a wide range of essential conditions.

  7. Consenso e diferenças em equipes do Programa Saúde da Família Agreements and disagreements in the Family Health Care Program team

    Directory of Open Access Journals (Sweden)

    José Ivo dos Santos Pedrosa

    2001-06-01

    Full Text Available OBJETIVO: Identificar temáticas que promovam consenso e divergências entre médicos, enfermeiros e agentes que compõem a equipe do Programa Saúde da Família. MÉTODOS: Estudo qualitativo que utiliza grupos focais como técnica de pesquisa com agentes masculinos e femininos, médicos e enfermeiras da equipe do Programa Saúde da Família, em Teresina, PI. Foram realizadas sessões com os grupos, conduzidas por monitor e participação de observador, utilizando roteiro com as questões: inserção no programa; processo de capacitação; princípios do programa; relações com a formação e com o modelo assistencial predominante; relações entre membros da equipe e comunidade; serviços demandados e disponíveis; situação trabalhista e condições de trabalho; e fatores positivos e negativos. RESULTADOS: Temáticas gerais como trabalho na comunidade, cuidados preventivos e trabalho em equipe geraram consenso entre as três categorias de profissionais. Temas que reforçaram a divisão entre categorias foram salário, organização do processo de trabalho, relações com a comunidade, responsabilidades da equipe e estratégias de atendimento à demanda. Temas que promoveram o aparecimento de subgrupos em cada categoria foram: condições de trabalho, salário, relações com a comunidade e responsabilidades da equipe. CONCLUSÕES: Temas que evidenciaram diferenças em maior grau reforçaram as características corporativas de cada categoria, enquanto temas que promoveram o aparecimento de subgrupos foram discutidos a partir de referências externas, implicando a necessidade de definir especificidades do processo de trabalho no programa. As estratégias para atendimento às demandas da comunidade representaram temáticas emergenciais ao grupo de agentes, pois a eles coube a solução imediata para os problemas na relação comunidade e serviço.OBJECTIVE: To identify issues that promote agreement and disagreement among doctors, nurses, and

  8. 38 CFR 17.241 - Sharing medical information services.

    Science.gov (United States)

    2010-07-01

    ..., research centers, and individual members of the medical profession, under which medical information and techniques will be freely exchanged and the medical information services of all parties to the agreement will... highly trained and qualified members of the medical profession. (c) Use of electronic equipment. Recent...

  9. In-service examination of IHX tubing with eddy current NDT equipment

    International Nuclear Information System (INIS)

    Brown, R.L.

    1972-01-01

    Single and multiple frequency eddy current (ET) nondestructive testing (NDT) techniques and equipment were investigated for in-service inspection of sodium-contaminated intermediate heat exchanger (IHX) tubing. A four frequency technique, demonstrated in the laboratory, was relatively insensitive to signals caused by probe motion, tube support plates, and residual sodium on the outer surface of the tubes. No method was found to avoid the signals from residual sodium on the inside surfaces of the tube. (U.S.)

  10. On the Supply Chain Management Supported by E-Commerce Service Platform for Agreement based Circulation of Fruits and Vegetables

    Science.gov (United States)

    Bao, Liwei; Huang, Yuchi; Ma, Zengjun; Zhang, Jie; Lv, Qingchu

    According to analysis of the supply chain process of agricultural products, the IT application requirements of the market entities participating in the agreement based circulation of fruits and vegetables have been discussed. The strategy of supply chain management basing on E-commerce service platform for fruits and vegetables has been proposed in this paper. The architecture and function composing of the service platform have been designed and implemented. The platform is constructed on a set of application service modules User can choose some of the application service modules and define them according to the business process. The application service modules chosen and defined by user are integrated as an application service package and applied as management information system of business process. With the E-commerce service platform, the supply chain management for agreement based circulation of agricultural products of vegetables and fruits can be implemented.

  11. Supporting management of medical equipment for inpatient service in public hospitals: a case study.

    Science.gov (United States)

    Figueroa, Rosa L; Vallejos, Guido E

    2013-01-01

    This work presents a study of medical equipment availability in the short and long term. The work is divided in two parts. The first part is an analysis of the medical equipment inventory for the institution of study. We consider the replacement, maintenance, and reinforcement of the available medical equipment by considering local guidelines and surveying clinical personnel appreciation. The resulting recommendation is to upgrade the current equipment inventory if necessary. The second part considered a demand analysis in the short and medium term. We predicted the future demand with a 5-year horizon using Holt-Winters models. Inventory analysis showed that 27% of the medical equipment in stock was not functional. Due to this poor performance result we suggested that the hospital gradually addresses this situation by replacing 29 non-functional equipment items, reinforcing stock with 40 new items, and adding 11 items not available in the inventory but suggested by the national guidelines. The results suggest that general medicine inpatient demand has a tendency to increase within the time e.g. for general medicine inpatient service the highest increment is obtained by respiratory (12%, RMSE=8%) and genitourinary diseases (20%, RMSE=9%). This increment did not involve any further upgrading of the proposed inventory.

  12. Energy Efficiency Sector in Russia. Market Survey of Equipment and Services

    International Nuclear Information System (INIS)

    2006-02-01

    The aim of the present Survey is to give an insight of energy efficiency (EE) in Russia and to assess the demand for EE equipment and services in the energy sector. In the Survey the term 'Energy Efficiency' means the efficient generation, distribution and consumption of heat and power. The main EE measures are classified as recovery of sources of energy, measuring and controlling systems, optimal use of the equipment, modernisation, in-house energy generation and renewable energy sources. Chapter 3 gives an overview of the current situation of the Russian energy sector. The term 'energy sector' is used in the context of generation, distribution and consumption of heat and power. The infrastructure and the ownership of the energy sector are examined. In this chapter special attention is paid to the Power Sector Reform and how the Reform affects the development of EE in the Russian energy sector. Chapter 4 describes the current situation in EE, giving the reasons of inefficiency in energy use and possible solutions for improving. Chapter 5 presents a market research of equipment that could make a great input into EE development. The research has shown that the most promising opportunities for suppliers of EE equipment lie in the heat sector (generation, distribution, consumption). This chapter also describes the development of ESCOs (Energy Service Companies) in Russia. Chapter 6 gives an overview of domestic and foreign capital available to finance EE development. According to conventional market based incentives, end users invest into increasing their profits more intensively than into projects aiming at energy saving. That is mostly because energy is relatively cheap in Russia and the federal governmental policy does not stimulate EE development either. Chapter 7 on the market approach advises on steps that have to be taken and risks that need to be avoided in order to enter the Russian market successfully. It warns of the possible pitfalls on this way. Chapter 8

  13. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  14. 49 CFR 212.105 - Agreements.

    Science.gov (United States)

    2010-10-01

    ... TRANSPORTATION STATE SAFETY PARTICIPATION REGULATIONS State/Federal Roles § 212.105 Agreements. (a) Scope. The... facilities, equipment, and operating practices through planned routine compliance inspections for all, or a...

  15. The relative patient costs and availability of dental services, materials and equipment in public oral care facilities in Tanzania.

    Science.gov (United States)

    Nyamuryekung'e, Kasusu K; Lahti, Satu M; Tuominen, Risto J

    2015-07-01

    Patient charges and availability of dental services influence utilization of dental services. There is little available information on the cost of dental services and availability of materials and equipment in public dental facilities in Africa. This study aimed to determine the relative cost and availability of dental services, materials and equipment in public oral care facilities in Tanzania. The local factors affecting availability were also studied. A survey of all district and regional dental clinics in selected regions was conducted in 2014. A total of 28/30 facilities participated in the study. A structured interview was undertaken amongst practitioners and clinic managers within the facilities. Daily resources for consumption (DRC) were used for estimation of patients' relative cost. DRC are the quantified average financial resources required for an adult Tanzanian's overall consumption per day. Tooth extractions were found to cost four times the DRC whereas restorations were 9-10 times the DRC. Studied facilities provided tooth extractions (100%), scaling (86%), fillings (79%), root canal treatment (46%) and fabrication of removable partial dentures (32%). The ratio of tooth fillings to extractions in the facilities was 1:16. Less than 50% of the facilities had any of the investigated dental materials consistently available throughout the year, and just three facilities had all the investigated equipment functional and in use. Dental materials and equipment availability, skills of the practitioners and the cost of services all play major roles in provision and utilization of comprehensive oral care. These factors are likely to be interlinked and should be taken into consideration when studying any of the factors individually.

  16. Guide to Effective Business Practices in Buying School Supplies, Instructional Materials, Equipment and Services.

    Science.gov (United States)

    Association of School Business Officials International, Reston, VA.

    This guide to effective business practices is intended to assist schools in establishing general policies and procedures for buying supplies, instructional materials, equipment, and services. Federal, state, and local laws must be considered in addition to the recommendations made in this report. Practical guidelines are given for selecting…

  17. Farm Equipment Manufacturing and Maintenance Services by Blacksmiths in Mali

    Directory of Open Access Journals (Sweden)

    O. Djiré

    2004-03-01

    Full Text Available The Office of Niger has largely contributed to the spread of animal traction technology. Draft animals being largely available, the major constraint has been the high price of imported equipment relative to the purchasing power of the farmers. From the 1980s, considerable quantities of animal traction implements have been introduced particularly by the Arpon project. These implements were assembled at a central workshop and distributed to farmers through a medium term credit facility, including purchase of oxen. Meanwhile support was given to the upgrading of the first blacksmiths’ workshops, providing them with basic equipment, on credit. In the Southern Mali cotton production zone as well as in the Segou River plains rice producing area, associations of blacksmiths have also been created. These networks have greatly contributed to the improvement of skills and turn over of their members. Blacksmiths have become the main producers of animal traction equipment in Mali. Also, farmers greatly appreciate after-sales services. Nevertheless, the sector is still handicapped by major constraints, which are the high price of imported steel, the poor distribution network for electricity and its high cost, as well as the actual absence of credit facilities for blacksmiths. Therefore, in 1997, the blacksmiths’ association of the Office of Niger zone, together with those of the two other zones have created the CMDT/ON/ORS Blacksmiths’ Federation. Its main purposes are the provision and distribution of raw materials (steel products, facilitation of workshop upgrading, organization of training and exchange sessions, and promotion of product marketing.

  18. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    2011-04-09

    Apr 9, 2011 ... standards and increased use of disposable anesthetic equipment. An audit of equipment and facilities for anesthetic care in pediatric patients is important and should be carried out periodically to appraise the situation for upgrading of essential anesthetic facilities and equipment. Appendix A. 18th March, ...

  19. Design considerations, tooling and equipment for remote in-service inspection of radioactive piping and pressure vessel systems

    International Nuclear Information System (INIS)

    Schmoker, D.S.; Swannack, D.L.

    1983-01-01

    In-Service Inspection programs are performed to monitor and verify the integrity of a nuclear power plant's primary pressure boundaries. Early detection of abnormal structural or material degradation could preclude serious damage to plant systems. This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  20. A survey of current and anticipated use of standard and specialist equipment by UK optometrists.

    Science.gov (United States)

    Dabasia, Priya L; Edgar, David F; Garway-Heath, David F; Lawrenson, John G

    2014-09-01

    To investigate current and anticipated use of equipment and information technology (IT) in community optometric practice in the UK, and to elicit optometrists' views on adoption of specialist equipment and IT. An anonymous online questionnaire was developed, covering use of standard and specialist diagnostic equipment, and IT. The survey was distributed to a random sample of 1300 UK College of Optometrists members. Four hundred and thirty-two responses were received (response rate = 35%). Enhanced (locally commissioned) or additional/separately contracted services were provided by 73% of respondents. Services included glaucoma repeat measures (30% of respondents), glaucoma referral refinement (22%), fast-track referral for wet age-related macular degeneration (48%), and direct cataract referral (40%). Most respondents (88%) reported using non-contact/pneumo tonometry for intra-ocular pressure measurement, with 81% using Goldmann or Perkins tonometry. The most widely used item of specialist equipment was the fundus camera (74% of respondents). Optical Coherence Tomography (OCT) was used by 15% of respondents, up from 2% in 2007. Notably, 43% of those anticipating purchasing specialist equipment in the next 12 months planned to buy an OCT. 'Paperless' records were used by 39% of respondents, and almost 80% of practices used an electronic patient record/practice management system. Variations in responses between parts of the UK reflect differences in the provision of the General Ophthalmic Services contract or community enhanced services. There was general agreement that specialised equipment enhances clinical care, permits increased involvement in enhanced services, promotes the practice and can be used as a defence in clinico-legal cases, but initial costs and ongoing maintenance can be a financial burden. Respondents generally agreed that IT facilitates administrative flow and secure exchange of health information, and promotes a state-of-the-art practice image

  1. Analysis of quality control protocol implementation of equipment in radiotherapy services

    International Nuclear Information System (INIS)

    Calcina, Carmen S. Guzman; Lima, Luciana P. de; Rubo, Rodrigo A.; Ferraz, Eduardo; Almeida, Adelaide de

    2000-01-01

    Considering the importance of the Quality Assurance in the radiotherapy services, there was an interest to make tests' evaluation for a Quality Control for the cobalt equipment, linear accelerator and simulator as a classification and comparison. The work proposed is a suggestion that can serve as tool for medical physicists that are starting to work in the radiotherapy area and for the most experts. The discussions were made by the gathering of local tests and official protocols, resulting in a minimum protocol as a suggestion for a routine work, emphasizing the periodicity and level of tolerance of each one of the tests. (author)

  2. MARKETING STRATEGY DEVELOPMENT FOR A COMPANIES PROVIDING SPECIAL EQUIPMENT SERVICES IN NOVOSIBIRSK REGION

    Directory of Open Access Journals (Sweden)

    Isaeva N. A.

    2014-12-01

    Full Text Available In Russia some companies didn’t have a marketing strategy yet, but marketing is very important part of company management. In the case of the absence of the marketing strategy, a director risks to fill the storage by goods with no demand, or to try to do some useless services, to encounter with unknown competing goods, or to reduce some successful operations. In the article was developed methodic techniques and economic-mathematical models for creating the marketing strategy for companies providing special equipment service in Novosibirsk region. Using the proposed models and methods was created marketing strategy for «TC Athena» with regard to the sphere of activity of the company.

  3. 29 CFR 1908.10 - Cooperative Agreements.

    Science.gov (United States)

    2010-07-01

    ... CONSULTATION AGREEMENTS § 1908.10 Cooperative Agreements. (a) Who may make Agreements. The Assistant Secretary... consultation services to private sector employers. (3) Renegotiation of existing Agreements funded under this part shall be initiated within 30 days of the effective date of these revisions. (c) Contents of...

  4. Basis for an innovative partnership. City utilities and Swisscom sign an agreement on energy services

    International Nuclear Information System (INIS)

    Aeberli, O.

    1999-01-01

    The seven big Swiss city utilities (IGSS) prepare themselves jointly to the liberalised energy market. Recently, they signed with a delegation of 'Swisscom Immobilien AG' (the building management subsidiary of the largest telecommunication company in Switzerland) an agreement on energy services. This is a win-win opportunity in the long term. Swisscom interest is to find one single competent and efficient partner for the seven cities. Today the company has to make business with 600 different electric utilities for the power supply to its 2000 buildings in Switzerland. The city utilities are interested in offering new energy services [de

  5. Accreditation in Western Europe: adequate reactions to Bologna declaration and the General Agreement on Trade in Services?

    NARCIS (Netherlands)

    Westerheijden, Donald F.

    2003-01-01

    Challenged by globalization (especially the General Agreement on Trade in Services [GATS]) and by European developments (the Bologna process), the Netherlands will introduce program accreditation as a new form of quality assurance. Other, sometimes similar initiatives are found in other countries

  6. Evaluation of the use of personal protective equipment in radiodiagnostic services in Sergipe

    International Nuclear Information System (INIS)

    Santos, Lucas R. dos; Oliveira, Celso A.; Silva, Fabio A.R.; Souza, Divanizia N.

    2008-01-01

    The theme ionizing radiation is frequently associated with danger. Therefore this subject induces to think about accessories to personal protection. These accessories can contain metal heavy (as example, lead) so that we have an efficient protection. Our analysis was done with the main objective of evidence that is not enough the radiodiagnostic services have personal protective equipment to disposal to the radiology technicians have an efficient protection, because the procedures with ionizing radiation will be safe only with the use accomplish of the security procedures and of adequate use and storing of personal protective equipment. In our analysis the accessories in question were the lead rubber X-ray protection aprons and thyroid gland protectors. We have tested these accessories through of a similar methodology utilized to checking the half-value layer of the X-ray units. It was investigated also the importance given to use of these accessories by the radiology technicians. (author)

  7. Plant equipment services with laser metrology

    International Nuclear Information System (INIS)

    Hayes, J.H.; Kreitman, P.J.

    1995-01-01

    A new industrial metrology process is now being applied to support PWR Nuclear Plant Steam Generator Replacement Projects. The method uses laser tracking interferometry to perform as built surveys of existing and replacement plant equipment. This method provides precision data with a minimum of setup when compared to alternative methods available. In addition there is no post processing required to ascertain validity. The data is obtained quickly, processed in real time and displayed during the survey in the desired coordinate system. These capabilities make this method of industrial measure ideal for various data acquisition needs throughout the power industry, from internal/external equipment templating to area mapping. Laser tracking interferometry is an improvement on the present use of optical instruments and surveying technique. In order to describe the laser tracking interferometry measurement process, previous methods of templating and surveying are first reviewed

  8. Radiation protection in radiology services in the municipality of Sao Paulo, SP, Brazil

    International Nuclear Information System (INIS)

    Senise, Paulo H.; Silva, Ezequiel; Ruzene, Anderson A.; Braga, Adriano C.; Spirgatis, Armim; Medeiros, Regina B.

    2013-01-01

    The FIDI company providing service to local health care system is responsible for managing part of the services diagnostic imaging of Sao Paulo in the South and Southeast ( 60 % ), Eastern ( 20 % ) and Midwest (20 %), Brazil. The generation of images in the municipal net is performed in conventional manner. Since 2009 works a maintenance associated with the verification of the performance of radiological equipment (annual) and processing (monthly) one. In 2008, on the occasion of the agreement between the city hall and FIDI, conditions were evaluated for radiological protection in 52 care units of the municipality. Were carried out verification tests of performance in conventional equipment, mammographic and tomographic equipment, in 138 and 71 analog processors, according to current legislation. In 2008 , 33 % of the devices had technical problems that prevented its operation. Currently only 3.4 % of the 91 are in radiological equipment maintenance. In 2008 the majority of radiological equipment had more than 10 years of manufacturing, while today fixed equipment have been replaced by new ones and therefore the use of mammography and generally have 2 to 3 years of manufacture . Currently the 31 processors are operative in 2008, 28 % were out of order. The replacement of most of the equipment associated with program quality and preventive/corrective maintenance has kept the service in accordance with the law. (author)

  9. 7 CFR 900.109 - Mediation agreement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Mediation agreement. 900.109 Section 900.109 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... Mediation agreement. An agreement arrived at by mediation shall not become effective until approved by the...

  10. The oil and gas equipment and services market in Bolivia

    International Nuclear Information System (INIS)

    2003-01-01

    The economy of Bolivia is based mainly on agriculture and resource extraction, making Bolivia one of the poorest countries in Latin America. Approximately 14 per cent of exports are hydrocarbons. Starting in 1996, the oil and gas sector was privatised, resulting in the domination of multinational corporations. It is estimated that the natural gas reserves of Bolivia stand in excess of 2.2 trillion cubic metres. Equipment, materials, and services used in all stages of the oil and gas production and distribution chain are all in demand in Bolivia. Over the medium term, it is expected that pipelines and equipment required for gas-fired power plants represent the most important opportunity in the country. Incentives for vehicle and industrial conversion were included in the new domestic energy plan, as well as the extension of the domestic gas distribution system to 250,000 homes. Canadian geomatics capability could fill the requirements concerning the Bolivian oil and gas assets still in the exploration, development, and documentation stages. Companies with exploration and development contracts, companies producing from commercial fields, refinery operators, producers in the liquid propane gas and compressed natural gas sub-sector, as well as pipeline operators are all considered key players, in addition to the Bolivian Chamber of Hydrocarbons. The customers are sophisticated buyers who purchase based on technical specifications and price negotiations. There are no significant non-tariff barriers, and Bolivia has adopted liberal trade policies. 9 refs., 3 tabs

  11. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2000-01-01

    Full text: The main objective of the activity of the Establishment for Nuclear Equipment (ZdAJ) in 1999 was to obtain the ISO 9001 certificate. Work on this problem has been successfully completed. The changes introduced in agreement with requirements of ISO in supervising the construction, manufacturing and servicing eliminate possible deficiencies of our products and will pay in the future. Two new important ventures have been undertaken: design of an accelerator with two photon energies and a reconstruction of simulator directed towards better geometrical parameters. The completion of the improvements in accelerator is foreseen for the year 2002. The changes comprise almost all sub-assemblies of the device. The modernized simulator will be installed in the hospital already in the year 2000 - the ameliorations concern mainly the arm of the apparatus, collimator, driving gears and control system. Of course - apart from this, the routine production activity of the Establishment was continued in 1999. (author)

  12. 14 CFR 135.122 - Stowage of food, beverage, and passenger service equipment during aircraft movement on the...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Stowage of food, beverage, and passenger....122 Stowage of food, beverage, and passenger service equipment during aircraft movement on the surface... when any food, beverage, or tableware furnished by the certificate holder is located at any passenger...

  13. 14 CFR 125.333 - Stowage of food, beverage, and passenger service equipment during airplane movement on the...

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Stowage of food, beverage, and passenger... food, beverage, and passenger service equipment during airplane movement on the surface, takeoff, and... certificate holder may move an airplane on the surface, take off, or land unless each food and beverage tray...

  14. 77 FR 42310 - Notice of Agreements Filed

    Science.gov (United States)

    2012-07-18

    ...; Washington, DC 20006-4007. Synopsis: The agreement would provide for delivery of data to the Port of Oakland... delivery. Agreement No.: 201217. Title: Port of Long Beach Data Services Agreement. Parties: Port of Long... 1100; Washington, DC 20006-4007. Synopsis: The agreement would provide for delivery of data to the Port...

  15. eServices for Hospital Equipment

    NARCIS (Netherlands)

    De Jonge, M.; Van der Linden, W.P.M.; Willems, H.X.

    2007-01-01

    In this paper we explore the idea that by combining different sources of information in a hospital environment, valuable e-services canbe developed that may help in reducing cost and improving quality of service. Companies, like Philips Medical Systems, may have a compe-titive advantage, because

  16. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex E - Report of the electric Equipment Service

    International Nuclear Information System (INIS)

    Sanovic, V.; Stamenkovic, D.

    1985-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  17. Technical Service Agreement (TSA) | FNLCR Staging

    Science.gov (United States)

    Frederick National Lab for Cancer Research (FNLCR)scientists provide services and solutions to collaborators through the Technical Services Program, whose portfolio includes more than200 collaborations with more than 80 partners such as t

  18. METHODOLOGY OF DETERMINATION OF QUALITY INDEX OF MAINTENANCE SERVICE SYSTEM OF POWER EQUIPMENT OF TRACTION SUBSTATIONS

    Directory of Open Access Journals (Sweden)

    O.O. Matusevych

    2016-03-01

    Full Text Available Purpose. The purpose of this paper is development of methodology for definition of a quality system of maintenance and repair (M and P power equipment of traction substations (TS of electrified railways operating under conditions of uncertainty based on expert information. Methodology. The basic tenets of the theory of fuzzy sets and marks, linguistic and interval estimates of experts were applied to solve this problem. Results. Analysis of the existing diversity of approaches to development of modern methods of improvement of M and P allows us to conclude that the improvement in the quality of the system is achieved by solving individual problems increase the operational reliability of power equipment of traction substations in the following main interrelated areas. There are technical, economic and organizational. The basis of the quality evaluation system is initial data and expertise developed version of the document formalized quality evaluation of electrical equipment of traction substations by experts. The choice of determining the level of Quality service system based on the marks, linguistic and interval estimates of experts, which are reflected in quantitative and / or qualitative form was done. The possible options for expert data presentation and their corresponding quantitative methods of calculating the integral index of quality improvement system maintenance and P of traction substations were described. The methodology and the method of assessing the quality of system maintenance and P of TS allows quickly respond to changing operating conditions of power equipment of traction substations, and to determine the most effective strategies for maintenance of electrical and P TS under conditions of uncertainty functioning distance electricity. Originality. The method of a systematic approach to improve the quality of the system maintenance and P of power equipment of traction substation under conditions of uncertainty based on expert

  19. Meeting the challenge of extremely corrosive service: A primer on clad oilfield equipment

    International Nuclear Information System (INIS)

    Pendley, M.R.

    1993-01-01

    Extremely corrosive environments, such as those often encountered in deep, hot, sour oil and gas wells, are usually characterized by the presence of hydrogen sulfide (H 2 S), carbon dioxide (CO 2 ), chlorides, and other corrosive species coupled with high temperatures (> 400 F/204 C) and high pressures (up to 20,000 psi/138 MPa). Most low alloy and stainless steel materials are not suitable for such environments. Extremely corrosive service conditions dictate the use of a corrosion-resistant alloy (CRA) in areas which are exposed to the hostile environment. However, it is often cost-prohibitive to make an entire component out of CRA material. An alternative strategy is to use a low alloy steel for the bulk of the component and clad critical surfaces with a corrosion-resistant material. Clad equipment can provide excellent corrosion resistance in hostile environments at a fraction of the cost of 100% CRA components. This paper will detail the problems posed by extremely corrosive environments and discuss how clad equipment provides a cost-effective solution

  20. 7 CFR 3016.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment. 3016.32 Section 3016.32 Agriculture Regulations of the Department of Agriculture (Continued) OFFICE OF THE CHIEF FINANCIAL OFFICER, DEPARTMENT OF AGRICULTURE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL...

  1. 24 CFR 84.34 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER... the physical inspection and those shown in the accounting records shall be investigated to determine... requirement for the equipment exists in other Federal agencies. HUD shall issue instructions to the recipient...

  2. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  3. Atomic energy: agreement between Canada and Australia

    International Nuclear Information System (INIS)

    1983-01-01

    This agreement provides for the exchange of nuclear materials and equipment between Canada and Australia and specifies the safeguards and other protective measures that shall be employed to ensure the peaceful use of the nuclear technology shared between the two countries

  4. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  5. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  6. A brief description of TiSA and the implications of the agreement

    Directory of Open Access Journals (Sweden)

    Alina Aluculesei

    2016-10-01

    Full Text Available This article presents an overview of a new Agreement on Trade in Services, which is still under negotiation. Topics addressed in this paper are as follows: (a Why is a new agreement on trade in services necessary? (B What will be the architecture of the new agreement and how it differs from the General Agreement on Trade in Services (GATS of the WTO? (C What topics are considered as possible problematic by states participating in the negotiations? The article points out that the necessity of the TiSA agreement has its roots in the failure to complete negotiations on services under the Doha Round, and adopting this plurilateral agreement would simplify business relationships among member countries and set a new global standard for trade in services.

  7. 47 CFR 73.1650 - International agreements.

    Science.gov (United States)

    2010-10-01

    ... Agreements for the Broadcasting Service in Region 2: (i) MF Broadcasting 535-1605 kHz, Rio de Janeiro, 1981. (ii) MF Broadcasting 1605-1705 kHz, Rio de Janeiro, 1988. (3) Bi-lateral Agreements between the United...

  8. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1988-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  9. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1990-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  10. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1987-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  11. Report of the electric equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V; Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1983-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  12. Production sharing agreements

    International Nuclear Information System (INIS)

    1994-01-01

    This paper, which was presented at the Production Sharing Agreement seminar, discusses economic rent, negotiations, trends in fiscal system development, and concessionary systems. Production sharing contracts, risk service contracts, joint ventures and the global market are examined. (UK)

  13. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  14. Complex modal properties of coupled moderately light equipment-structure systems

    International Nuclear Information System (INIS)

    Gupta, A.K.; Jaw Jingwen

    1986-01-01

    A new improved perturbation method for evaluating complex modal properties of coupled equipment-structure systems is presented. The method is applicable even when the equipment is not very light, and when the secondary system (equipment) introduces static constraint on the primary system (structure). The new method is applied to nine 8DOF coupled multiply connected equipment-structure systems. It is shown that the new method yields results which are in excellent agreement with the corresponding exact results. (orig.)

  15. Test-retest Reliability and Agreement of the Satisfaction with the Assistive Technology Services (SATS) Instrument in Two Nordic Countries

    DEFF Research Database (Denmark)

    Sund, Terje; Anttila, Heidi; Iwarsson, Susanne

    2014-01-01

    Purpose: The purpose of this study was to investigate test–retest reliability, agreement, internal consistency, and floor- and ceiling effects of the Danish and Finnish versions of the Satisfaction with the Assistive Technology Services (SATS) instrument among adult users of powered wheelchairs (...

  16. 47 CFR 76.1621 - Equipment compatibility offer.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment compatibility offer. 76.1621 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1621 Equipment compatibility offer. Cable system... offer to supply each subscriber with special equipment that will enable the simultaneous reception of...

  17. The integrated design of building services by an equipped and eco-efficient module (MOTE2

    Directory of Open Access Journals (Sweden)

    Roberto Giordano

    2016-12-01

    Full Text Available The targets set out by European Directives concerning the energy savings in the construction sector refer both to building envelope and to its services. With regard to building services it is mandatory meeting requirements related to heating, cooling, lighting and ventilation. Building services take up a variable space in the buildings that cannot be considered anymore negligible and they would always be fully integrated into buildings. Equipped and Eco-efficient Technological Module (MOTE2 is a research project aimed at implementing the integration in a unique services cupboard of some building services: heating and cooling; domestic hot water; mechanical ventilation. The project was organized according to four main phases. In phase 1 a set of rules was defined matching requirements related to the energy efficiency to environmental building design standards. During the phase 2 six building models were studied in order to size the corresponding building services according to scenario analysis set down for existing buildings. In phase 3 the project was focused on designing the assembly among services. The cupboard design is like a Tetris® game through the planning of the best combination among services shape. Based on the drawings developed a first mock-up was built up and monitored. Finally, in phase 4 the paper deals with the MOTE2’s expected performances. Outlook and some conclusions point out the future steps of the research activities.

  18. Effectiveness of medical equipment donations to improve health systems: how much medical equipment is broken in the developing world?

    Science.gov (United States)

    Perry, Lora; Malkin, Robert

    2011-07-01

    It is often said that most of the medical equipment in the developing world is broken with estimates ranging up to 96% out of service. But there is little documented evidence to support these statements. We wanted to quantify the amount of medical equipment that was out of service in resource poor health settings and identify possible causes. Inventory reports were analyzed from 1986 to 2010, from hospitals in sixteen countries across four continents. The UN Human Development Index was used to determine which countries should be considered developing nations. Non-medical hospital equipment was excluded. This study examined 112,040 pieces of equipment. An average of 38.3% (42,925, range across countries: 0.83-47%) in developing countries was out of service. The three main causes were lack of training, health technology management, and infrastructure. We hope that the findings will help biomedical engineers with their efforts toward effective designs for the developing world and NGO's with efforts to design effective healthcare interventions.

  19. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  20. 40 CFR 63.1363 - Standards for equipment leaks.

    Science.gov (United States)

    2010-07-01

    ... the replacement equipment and the actual date of delivery of the replacement equipment. (E) The date... heavy liquid service. Information, data, and analysis used to determine that a piece of equipment or... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Standards for equipment leaks. 63.1363...

  1. 46 CFR 356.41 - Management agreements.

    Science.gov (United States)

    2010-10-01

    ... which the management company provides marketing services, consulting services or other services that are... otherwise effectively gain control over the management and operation of the vessel or vessel-owning entity... 46 Shipping 8 2010-10-01 2010-10-01 false Management agreements. 356.41 Section 356.41 Shipping...

  2. Development of OSSA(Operation Service Support Agreement) Simulator and Site Acceptance Test

    Energy Technology Data Exchange (ETDEWEB)

    Park, DaeSeung; Ahn, Sung-Jin; Lee, Jong-Beom [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Building the nuclear power plant is on the schedule, remaining question is who could operate the NPP after the construction is finished. OSSA is known as Operation Service Support Agreement, it is the contract between KHNP(Korea Hydro and Nuclear Power Co.,) and ENEC(Emirates Nuclear Energy Corporation) for United Arab Emirates Nuclear Power Plant operations support. The contract is mostly about the safety and reliability operations and as well as of the training of UAE operators to have better experiences. UAE operators needed to be trained and tested before they come to UAE for operate the NPP. The OSSA simulator was built because operator shall not make any mistakes even if the plant is not yet constructed. Simulator Training is a key for getting experiences without operating the actual plant, because the nuclear power plant never used as the test in real situations. Operators’ requirement is to have more than 2 years at site experiences and also they have to be trained 5 to 8 months of the training. The experience such as the site acceptance test will lead the future nuclear industry to meet the global standard and to lead the safety of the NPP. Under the OSSA agreement 400 KHNP experts will support the operations. Most of the operators were trained at the OSSA simulator which is most reliable simulator that can demonstrate satisfactory performance for the simulator.

  3. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...

  4. 49 CFR 374.313 - Equipment.

    Science.gov (United States)

    2010-10-01

    .... Each bus (except in commuter service) seating more than 14 passengers (not including the driver) shall..., DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS PASSENGER CARRIER REGULATIONS Adequacy of Intercity Motor Common Carrier Passenger Service § 374.313 Equipment. (a) Temperature control. A...

  5. Agreement between physicians' and nurses' clinical decisions for the management of the fracture liaison service (4iFLS): the Lucky Bone™ program.

    Science.gov (United States)

    Senay, A; Delisle, J; Raynauld, J P; Morin, S N; Fernandes, J C

    2016-04-01

    We determined if nurses can manage osteoporotic fractures in a fracture liaison service by asking a rheumatologist and an internist to assess their clinical decisions. Experts agreed on more than 94 % of all nurses' actions for 525 fragility fracture patients, showing that their management is efficient and safe. A major care gap exists in the investigation of bone fragility and initiation of treatment for individuals who have sustained a fragility fracture. The implementation of a fracture liaison service (FLS) managed by nurses could be the key in resolving this problem. The aim of this project was to obtain agreement between physicians' and nurses' clinical decisions and evaluate if the algorithm of care is efficient and reliable for the management of a FLS. Clinical decisions of nurses for 525 subjects in a fracture liaison service between 2010 and 2013 were assessed by two independent physicians with expertise in osteoporosis treatment. Nurses succeeded in identifying all patients at risk and needed to refer 27 % of patients to an MD. Thereby, they managed autonomously 73 % of fragility fracture patients. No needless referrals were made according to assessing physicians. Agreement between each evaluator and nurses was of >97 %. Physicians' decisions were the same in >96 %, and Gwet AC11 coefficient was of >0.960 (almost perfect level of agreement). All major comorbidities were adequately managed. High agreement between nurses' and physicians' clinical decisions indicate that the independent management by nurses of a fracture liaison service is safe and should strongly be recommended in the care of patients with a fragility fracture. This kind of intervention could help resolve the existing care gap in bone fragility care as well as the societal economic burden associated with prevention and treatment of fragility fractures.

  6. 7 CFR 1290.8 - Grant agreements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Grant agreements. 1290.8 Section 1290.8 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... minimum the following: (1) The projects in the approved State plan. (2) Total amount of Federal financial...

  7. 7 CFR 1291.8 - Grant agreements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Grant agreements. 1291.8 Section 1291.8 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS... minimum the following: (1) The projects in the approved State plan. (2) Total amount of Federal financial...

  8. On description of contracts and agreements in the context of SOA

    Directory of Open Access Journals (Sweden)

    Laima Paliulionienė

    2013-09-01

    Full Text Available The issue of making contracts between services in Service-Oriented Architecture (SOA arises naturally, because in real life services are subjects for negotiation and contracting. The notion of contract in SOA is rather misleading, because usually means just technical specification – input and output parameters, pre- and postconditions. However, there are also other aspects of contract. Service Level Agreements (SLAs often are used together with technical contract. SLAs describes the level of service expected by a customer from a supplier, laying out the metrics by which that service is measured, the remedies or penalties in case the agreed-upon levels are not achieved. The paper aim to clear up the notions of contract and agreement in SOA, discusses the properties of languages that are used to specify contacts and agreements, paying special attention to their legal aspects and comparing contract features in WS-Agreement ir WSLA.

  9. Automation and mechanization of in-service inspection of selected equipment in FRG's nuclear power plants

    International Nuclear Information System (INIS)

    Metke, E.

    1988-01-01

    The procedures and equipment are described for the automation and mechanization of in-service inspection in nuclear power plants in the FRG, used by the KWU company. Checks of the pressure vessel are done by visual means using a colour tv camera, the method of eddy currents and the ultrasonic method. An analysis is made of the time schedule of ultrasonic inspections, and the central column manipulator is described which allows to check all internal regions of the pressure vessel. Attention is also devoted to other devices, e.g., those for prestressing shanks, cleaning shanks, cleaning thread apertures, etc. A combined probe using the ultrasonic method and the eddy current method serves the inspection of heat exchange tubes in the steam generator. For inspecting the primary circuit the KWU company uses devices for checking and working the inner surface of pipes. Briefly described are examples of using KWU equipment in nuclear power plants in CMEA countries. (Z.M.). 11 figs., 6 refs

  10. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  11. Seismic resistance of equipment and building service systems: review of earthquake damage design requirements, and research applications in the USA

    International Nuclear Information System (INIS)

    Skjei, R.E.; Chakravartula, B.C.; Yanev, P.I.

    1979-01-01

    The history of earthquake damage and the resulting code design requirements for earthquake hazard mitigation for equipment in the USA is reviewed. Earthquake damage to essential service systems is summarized; observations for the 1964 Alaska and the 1971 San Fernando, California, earthquakes are stressed, and information from other events is included. USA building codes that reflect lessons learned from these earthquakes are discussed; brief summaries of widely used codes are presented. In conclusion there is a discussion of the desirability of adapting advanced technological concepts from the nuclear industry to equipment in conventional structures. (author)

  12. Integrated logistics management system for operation of machinery and equipment

    Directory of Open Access Journals (Sweden)

    Józef Frąś

    2014-09-01

    Full Text Available Background: The main issue in the operations of machinery and equipment, which is the subject of theoretical and empirical research is to provide high reliability and durability with qualitative post-trade services of machinery and equipment. Quality of service can be achieved through planned maintenance activities supported by computer technology. The article presents the concept of an integrated system of logistics management operation of machinery and equipment, especially special one for stationary transport equipment. At the outset, it emphasized the importance and essence of technological transport and storage systems storage in modern manufacturing enterprise. Then the objective and the method of research have been set. An essential part of deliberations in the article is the concept of integrated logistics management system operation for stationary transport equipment. Authors of this article have presented the results the implementation and operation of the system. The results are presented in a descriptive and graphic form. Methods: The purpose of this article is to present the concept of implementing an integrated logistics management system for operation of stationary transport equipment. It goes through combination of planning, event logging service, warehouse management in the field of spare parts, account and records of the cost of service activities. The paper presents an analysis and evaluation method of brainstorming a new approach to logistics management operation stationary transport equipment. Authors takes into account the specific conditions of use of transport equipment and conduct the service, which have a significant impact on the time and place of cost and service as well. It should be noted that the developed system has been implemented. It was also carried out an assessment of its functionality and efficiency as the new IT tool for logistics management operation. Results and conclusions: The paper presents a new

  13. Report of the Service for maintenance of electric equipment Service - Annex 3; Prilog 3 - Rad sluzbe za odrzavanje elektro opreme reaktora RA u 1975. godini

    Energy Technology Data Exchange (ETDEWEB)

    Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  14. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  15. 7 CFR 766.205 - Shared Appreciation Payment Agreement rates and terms.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Shared Appreciation Payment Agreement rates and terms. 766.205 Section 766.205 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Servicing Shared Appreciation Agreements and Net Recovery...

  16. 21 CFR 1250.67 - Watering equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as...

  17. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  18. International trade agreements: hazards to health?

    Science.gov (United States)

    Shaffer, Ellen R; Brenner, Joseph E

    2004-01-01

    Since the 1980s, neoliberal policies have prescribed reducing the role of governments, relying on market forces to organize and provide health care and other vital human services. In this context, international trade agreements increasingly serve as mechanisms to enforce the privatization, deregulation, and decentralization of health care and other services, with important implications for democracy as well as for health. Critics contend that social austerity and "free" trade agreements contribute to the rise in global poverty and economic inequality and instability, and therefore to increased preventable illness and death. Under new agreements through the World Trade Organization that cover vital human services such as health care, water, education, and energy, unaccountable, secret trade tribunals could overrule decisions by democratically elected officials on public financing for national health care systems, licensing and training standards for health professionals, patient safety and quality regulations, occupational safety and health, control of hazardous substances such as tobacco and alcohol, the environment, and affordable access to safe water and sanitation. International negotiations in 2003 in Cancun and in Miami suggested that countervailing views are developing momentum. A concerned health care community has begun to call for a moratorium on trade negotiations on health care and water, and to reinvigorate an alternative vision of universal access to vital services.

  19. 7 CFR 301.91-6 - Compliance agreement and cancellation thereof.

    Science.gov (United States)

    2010-01-01

    ... Plant Health Inspection Service, Plant Protection and Quarantine, Domestic and Emergency Operations... agreement shall be a written agreement between a person engaged in such a business and Plant Protection and... PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES European Larch...

  20. 75 FR 6397 - Notice of Agreements Filed

    Science.gov (United States)

    2010-02-09

    ... manage a joint venture limited liability company to provide stevedoring and other services for the... Agreement. Parties: A.P. Moller-Maersk A/S; Maersk Line Limited; and Zim Integrated Shipping Services, Ltd...

  1. 21 CFR 211.67 - Equipment cleaning and maintenance.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment cleaning and maintenance. 211.67 Section 211.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... Equipment cleaning and maintenance. (a) Equipment and utensils shall be cleaned, maintained, and, as...

  2. 42 CFR 409.14 - Supplies, appliances, and equipment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Supplies, appliances, and equipment. 409.14 Section... Hospital Services § 409.14 Supplies, appliances, and equipment. (a) Except as specified in paragraph (b) of this section, Medicare pays for supplies, appliances, and equipment as inpatient hospital or inpatient...

  3. Connected Equipment Maturity Model Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Butzbaugh, Joshua B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Whalen, Scott A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-01

    The Connected Equipment Maturity Model (CEMM) evaluates the high-level functionality and characteristics that enable equipment to provide the four categories of energy-related services through communication with other entities (e.g., equipment, third parties, utilities, and users). The CEMM will help the U.S. Department of Energy, industry, energy efficiency organizations, and research institutions benchmark the current state of connected equipment and identify capabilities that may be attained to reach a more advanced, future state.

  4. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  5. Health care agreements as a tool for coordinating health and social services

    DEFF Research Database (Denmark)

    Rudkjøbing, Andreas; Strandberg-Larsen, Martin; Vrangbaek, Karsten

    2014-01-01

    of general practitioners (n = 700/853). RESULTS: The health care agreements were considered more useful for coordinating care than the previous health plans. The power relationship between the regional and municipal authorities in drawing up the agreements was described as more equal. Familiarity......INTRODUCTION: In 2007, a substantial reform changed the administrative boundaries of the Danish health care system and introduced health care agreements to be signed between municipal and regional authorities. To assess the health care agreements as a tool for coordinating health and social...... with the agreements among general practitioners was higher, as was the perceived influence of the health care agreements on their work. DISCUSSION: Health care agreements with specific content and with regular follow-up and systematic mechanisms for organising feedback between collaborative partners exemplify...

  6. Services and investment in the EU-South Korea free-trade area: implications of a new approach for GATS V agreements and for bilateral investment treaties

    NARCIS (Netherlands)

    Mathis, J.; Laurenza, E.

    2012-01-01

    This paper focuses on the services and investment features of the recently concluded free trade agreement between the European Union and its Member States, of the one part, and the Republic of Korea, of the other part. This agreement is an early example of a new scheduling approach adopted by the

  7. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Curd mill and miscellaneous equipment. 58.419 Section... Service 1 Equipment and Utensils § 58.419 Curd mill and miscellaneous equipment. Knives, hand rakes... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  8. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  9. The Impact of the Canada-Korea Free Trade Agreement as Negotiated

    Directory of Open Access Journals (Sweden)

    Dan Ciuriak

    2014-12-01

    Full Text Available This paper analyzes the impact of the Canada-Korea Free Trade Agreement on the basis of the published text and agreed schedule of commitments. We find that the Agreement reinforces existing patterns of comparative advantage between Canada (agriculture and resource-based sectors and Korea (autos and other industries. The sensitive sectors that held up the deal for years - autos into Canada and beef into Korea - witness major trade gains, but are not unduly disrupted. In both economies, the major output gains otherwise come in non-traded services sectors, driven by income effects. We find that trade diversion effects are quite significant; this lends support for the domino theory of major free trade agreements - since the Korea-EU agreement broke the ice, the pressure has intensified on third parties to re-level playing fields by striking their own deals. The study breaks new ground in modelling services trade by developing policy impacts based on the extent to which the text of the Agreement modifies Korea's and Canada's scores on the OECD's Services Trade Restrictiveness Index and by providing estimates of Mode 3 Services trade impacts. The analysis of the Agreement as negotiated, the present study, in our view, is a step forward in understanding the impact of modern free trade agreements.

  10. 21 CFR 211.68 - Automatic, mechanical, and electronic equipment.

    Science.gov (United States)

    2010-04-01

    ... SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Equipment § 211.68 Automatic, mechanical, and electronic equipment. (a) Automatic, mechanical, or electronic... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Automatic, mechanical, and electronic equipment...

  11. 40 CFR 35.2107 - Intermunicipal service agreements.

    Science.gov (United States)

    2010-07-01

    ... historic service relationships for water supply, wastewater or other services between the affected... supplier agency is adequate to continue the project, even if one of the proposed customer agencies fails to participate. (Approved by the Office of Management and Budget under control number 2040-0027) ...

  12. Co-operation Agreement relating to LHC Commissioning

    CERN Multimedia

    2005-01-01

    CERN Director-General Robert Aymar and Ryszard Tadeusiewicz, the Rector of the AGH University of Science and Technology in Cracow, after signing the agreement. On 29 July, the Rector of the AGH University of Science and Technology in Cracow, Ryszard Tadeusiewicz, and CERN Director-General Robert Aymar signed a collaboration agreement relating to the commissioning of the instrumentation and monitoring equipment for the LHC cryogenic system. Under the agreement, a team consisting of a dozen physicists, engineers and technicians from the AGH University in Cracow will lend a helping hand to the teams at CERN for the commissioning of the cryogenic system in the tunnel. This is the first in what will be a series of agreements relating to the commissioning of the LHC's various systems. From the end of this year until the summer of 2007, CERN will require reinforcements of physicists, engineers and technicians in order to complete the many tasks associated with the start-up of the accelerator. CERN is therefore pre...

  13. Corporate Integrity Agreement (CIA) documents

    Data.gov (United States)

    U.S. Department of Health & Human Services — OIG negotiates corporate integrity agreements (CIA) with health care providers and other entities as part of the settlement of Federal health care program...

  14. WTO new round agreement and nuclear

    International Nuclear Information System (INIS)

    Lee, M. K.; Moon, L. H.; Kim, S. S.

    2002-01-01

    The start of new round of WTO could be recognized as a turning point shifting from bilateral or regional trade system to multilateral trade system worldwide. The changes in international trade system are expected to have some impact on the Korean nuclear industry. The purpose of this study is to understand the impact on prepare opening the market for the plant design and engineering. This market has been protected by Agreement on Government Procurement(AGP). However, this market will be eventually influenced by GATS(General Agreement on Trade in Services) with KEPCO's on going privatization being completed. There have been no impacts on R and D fund provided by the government as yet. However, in case of Government supported R and D for commercial purpose, there are much concerns to be discussed further within new WTO agreement. It is necessary to develop a strategy for maximizing national interests and promoting R and D in the negotiation for design and construction services related with nuclear industry, and energy services. Furthermore, to effectively explore new nuclear markets in developing countries including China, market analyses for their countries are required

  15. Medical equipment in government health facilities: Missed opportunities

    OpenAIRE

    Pardeshi Geeta

    2005-01-01

    BACKGROUND: The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. AIMS: (1) To identify the probl...

  16. Procuring, maintaining and using equipment: the key issues in controlling exposure to patients

    International Nuclear Information System (INIS)

    Hendra, I.R.F.

    1989-01-01

    Radiological equipment is not purpose-built for each individual application. Thus, not only are acceptance criteria directly related to the design of equipment and the quality assurance exercised during its manufacture, but also the performance, safety and reliability of equipment must feature in the requirements for procuring new equipment. In the UK this issue is dealt with under the Department of Health and Social Security Manufacturer Registration Scheme for Medical Equipment in its application to radiological equipment. Similarly the continuing reliability of equipment in service is directly related to the quality of maintenance services. This is determined largely by the manner in which such services are procured. In the UK this issue has been considered by one of four Working Parties commissioned by the South-East Thames Regional Health Authority who are the ''Centre of Responsibility'' for diagnostic imaging equipment. The report prepared from the first phase of activity of this working group describes features of a procurement specification for maintenance services and prescribes the complementary duties of contractors and customers. The use in X-ray departments of the kind of manufacturing quality system that is used by most reputable equipment manufacturers has the potential for a dramatic reduction in exposure to patients. (author)

  17. 7 CFR 4285.81 - Cooperative agreement awards.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE COOPERATIVE AGREEMENTS Federal-State Research on... the methods identified in approved application and budget, the regulations of this part, the terms and...

  18. The prospects for the World Trade Organisation Agreement on Government Procurement

    OpenAIRE

    Davies, Arwel

    2000-01-01

    This thesis questions the prospects for the World Trade Organisation, Agreement on Government Procurement. This is the most important international agreement seeking to promote cross-border trade in hitherto closed national procurement markets. For the above threshold goods, services and construction services contracts which it covers, the Agreement's principal objective is to require the non-discriminatory treatment of foreign suppliers. It is because of this general insistence on non-discri...

  19. Update of computer applications associated to measuring equipment of the services of internal dosimetry of NPPS and Tecnatom

    International Nuclear Information System (INIS)

    Bravo, B.; Sollet, E.; Serrano, E.

    2014-01-01

    Within the continuous improvement processes that take place in all the activities taking place in the Spanish nuclear power plants, and as a result of implementation of ISO Standards for Internal Dosimetry, has undertaken a review, improvement and updating INDAC ALEDIN and applications associated with measuring equipment and DIYs Quicky kind Personal Internal Dosimetry Services of the Spanish nuclear power plants and Tecnatom This paper presents updates capacities both tools. (Author)

  20. Prophylactic and thermovision measurements of electric machines and equipment

    International Nuclear Information System (INIS)

    Jedlicka, R.; Brestovansky, L.

    1996-01-01

    High-voltage measurements of generators, unit and service transformers and some significant motor drives used at a nuclear power plant are described in this paper. Thermovision measurements of electric machines and distribution systems are dealt with in the second part of the paper. Power electric equipment represent one of the most significant components of a nuclear power plant. Turbine mechanical energy is converted into the electrical energy within these equipment. Power generated by generators is transformed by transformers so that it can achieve appropriate parameters for both the transmission over the distribution system and the power plant service power supply. The service power supply switchboards and cables provide supply to motors and other consumers necessary for the nuclear power plant technological process. The whole complex of equipment has to be maintained in good technical conditions. It is necessary to make thermovision and prophylactic measurements to identify and verify the electric equipment technical condition. The mentioned measurements warn the operation staff in advance against both gradual deterioration of power connection contact resistances, i.e. power connections overheating, and the machine insulation systems condition deterioration. The operation staff try to prevent the electric equipment operation accidents by early removing the detected failures, thus, improving the nuclear safety. In order to provide the above-mentioned activities a special prophylactic measurement group was established at the NPP Bohunice in 1983. The group specialists make following types of measurements. 1. Prophylactic measurements of electric machines. Prophylactics of 220 MW generators and 6 MW service power generators; Prophylactics of both unit and service transformers and VHV bushings; Prophylactics of major 6 kV motor drives. 2. Thermovision measurements of current connections. Measurements enumarated in paragraph 1 are made on disconnected electric

  1. 24 CFR 266.505 - Regulatory agreement requirements.

    Science.gov (United States)

    2010-04-01

    ... force for the duration of the insured mortgage and note or bond. The Regulatory Agreement must include a... Project Management and Servicing § 266.505 Regulatory agreement requirements. (a) General. (1) The HFA... payments due under the mortgage and note/bond. (2) Where necessary, establish a sinking fund for future...

  2. Basic concepts and issues: a primer on distribution and sales representative agreements in the medical device and durable medical equipment industries.

    Science.gov (United States)

    Burow, Heiko E; Kolls, Raymond C

    2006-01-01

    Counsel for a manufacturer of medical devices or durable medical equipment must have working knowledge of various legal disciplines to draft contracts with intermediaries (sales representatives and distributors) for the marketing and sale of the manufacturer's products. If the manufacturer wishes to sell its products abroad, counsel must become familiar with the laws and business practices of the target country, and methods of gaining access to the foreign market. This Article gives readers an overview of the applicable legal principles, under U.S. and foreign laws, in the areas of agency, contracts, healthcare regulation, consumer protection, intellectual property protection, and dealer protection. To aid counsel in drafting intermediary agreements, specific contractual terms and issues are explored in depth, including: appointment clauses, performance provisions, provisions concerning pricing and payment, protective clauses (shielding the manufacturer from liability), term and termination provisions, independent contractor clauses, export control clauses, recordkeeping and audit provisions, choice of law clauses, and dispute resolution clauses.

  3. 78 FR 8090 - Misuse of Internet Protocol (IP) Captioned Telephone Service; Telecommunications Relay Services...

    Science.gov (United States)

    2013-02-05

    ... equipment and software used in conjunction with their service have captions turned off as the default... equipment and software used in conjunction with their service have a default setting of captions off, so...] Misuse of Internet Protocol (IP) Captioned Telephone Service; Telecommunications Relay Services and...

  4. Liquid Metal Fast Breeder Reactor plant maintenance and equipment design

    International Nuclear Information System (INIS)

    Swannack, D.L.

    1982-01-01

    This paper provides a summary of maintenance equipment considerations and actual plant handling experiences from operation of a sodium-cooled reactor, the Fast Flux Test Facility (FFTF). Equipment areas relating to design, repair techniques, in-cell handling, logistics and facility services are discussed. Plant design must make provisions for handling and replacement of components within containment or allow for transport to an ex-containment area for repair. The modular cask assemblies and transporter systems developed for FFTF can service major plant components as well as smaller units. The plant and equipment designs for the Clinch River Breeder Reactor (CRBR) plant have been patterned after successful FFTF equipment

  5. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  6. Federal Order approving the Agreement for cooperation on the peaceful uses of atomic energy between the Swiss Government and the Government of the United States of America

    International Nuclear Information System (INIS)

    1966-03-01

    This Order reproduces the Agreement of 30 December 1965 between Switzerland and the USA on peaceful nuclear cooperation. The Agreement, which entered into force on 8 August 1966 for 30 years replaced a previous similar Agreement of 1956. The Agreement provides for exchanges of information on the development, construction, operation of reactors, including nuclear power plants; various uses of radioisotopes and exchanges of personnel. The Agreement also provides for US supply of nuclear material and equipment to Switzerland, subject to guarantees given by that country that the material and equipment supplied will be used solely for peaceful purposes. Both Parties agreed to enter into a Safeguards Agreement with IAEA regarding material and equipment requiring such controls under the Agreement. (NEA) [fr

  7. 21 CFR 211.182 - Equipment cleaning and use log.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment cleaning and use log. 211.182 Section 211.182 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Reports § 211.182 Equipment cleaning and use log. A written record of major equipment cleaning...

  8. 40 CFR 63.1331 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1331... Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1331 Equipment leak... in pumps and agitator seals in light liquid service shall not be considered to be a leak. For...

  9. 44 CFR 208.37 - Reimbursement for equipment and supply costs incurred during Activation.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Reimbursement for equipment... SEARCH AND RESCUE RESPONSE SYSTEM Response Cooperative Agreements § 208.37 Reimbursement for equipment and supply costs incurred during Activation. (a) Allowable costs. DHS will reimburse costs incurred...

  10. World Energy Data System (WENDS). Volume VI. International agreement profiles

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-06-01

    The World Energy Data System contains organized data on those countries and international organizations that may have critical impact on world energy. The international agreement profiles in WENDS are all energy-related and are organized by energy technology. These are: coal; conservation; fusion; geothermal; nuclear fission; oil, gas, and shale; solar, wind, and ocean thermal; and other (cooperation in electrical power equipment acquisition, energy, energy research, etc.). The agreement profiles are accessible by energy technology and alphabetically by country.

  11. Calibration of laboratory equipment and its intermediate verification

    International Nuclear Information System (INIS)

    Remedi, Jorge O.

    2011-01-01

    When a laboratory wants to prove that he has technical competence to carry out tests or calibrations must demonstrate that it has complied with certain requirements that establish , among others, the mandatory : calibrate or verify equipment before putting it into service in order to ensure that it meets to the specifications of laboratory equipment to keep records evidencing the checks that equipment complies with the specification ; perform intermediate checks for maintain confidence in the calibration status of the equipment , ensure that the operation is checked and calibration status of equipment when the equipment goes outside the direct control of the laboratory , before be returned to service, establish a program and procedure for the calibration of equipment; show how determined the calibration periods of their equipment as well as evidence that intermediate checks are suitable for the calibration periods. However, some confusion is observed as to the meaning of the terms 'calibration' and 'verification' of a computer. This paper analyzes applicable documentation and suggests that the differences are generated in part by translations and by characterization concepts upon its usage, that is, if it is legal metrology or assessment conformity. Therefore, this study aims to characterize both concepts , fundamentals to zoom distinguish , outline appropriate strategies for calibration and verification activities to ensure the compliance with regulatory requirements [es

  12. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  13. 78 FR 12801 - New Postal Product; Negotiated Service Agreement

    Science.gov (United States)

    2013-02-25

    ... the United States Postal Service to Add Parcel Return Service Contract 3 to Competitive Product List... Commission is noticing a recently-filed Postal Service request to add Parcel Return Service Contract 3 to the....30 et seq., the Postal Service filed a request and associated supporting information to add Parcel...

  14. 40 CFR 82.36 - Approved refrigerant handling equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment. 82.36 Section 82.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Servicing of Motor Vehicle Air Conditioners § 82.36...-12, Extraction and Recycle Equipment for Mobile Automotive Air-Conditioning Systems, and Standard of...

  15. 5 CFR 179.306 - Written agreement for repayment.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Written agreement for repayment. 179.306 Section 179.306 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS CLAIMS COLLECTION STANDARDS Administrative Offset § 179.306 Written agreement for repayment. A debtor who admits...

  16. Medical equipment in government health facilities: missed opportunities.

    Science.gov (United States)

    Pardeshi, Geeta S

    2005-01-01

    The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. (1) To identify the problems in different stages of the life cycle. (2) To assess its financial implications and effect on service delivery. Analysis of secondary data from the latest Comptroller and Auditor General (CAG) Reports for the states in India. The study variables were category of equipment, financial implications and problems in the stages of life cycle. Calculation of proportions. A total of forty instances mentioning problems in the first phase of the life cycle of medical equipment were noted in 12 state reports. The equipment from the radiology department (15), equipment in the wards (5), laboratory (3) and operation theatres (4) were the ones most frequently implicated. In a majority of cases the financial implications amounted to twenty-five lakhs. The financial implications were in the form of extra expenditure, unfruitful expenditure or locking of funds. In 25 cases the equipment could not be put to use because of non-availability of trained staff and inadequate infrastructural support. Careful procurement, incoming inspection, successful installation and synchronization of qualified trained staff and infrastructural support will ensure timely onset of use of the equipment.

  17. Prophylactic and thermovision measurements of electric machines and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Jedlicka, R; Brestovansky, L [Atomova Elektraren Bohunice, Jaslovske Bohunice (Slovakia)

    1997-12-31

    High-voltage measurements of generators, unit and service transformers and some significant motor drives used at a nuclear power plant are described in this paper. Thermovision measurements of electric machines and distribution systems are dealt with in the second part of the paper. Power electric equipment represent one of the most significant components of a nuclear power plant. Turbine mechanical energy is converted into the electrical energy within these equipment. Power generated by generators is transformed by transformers so that it can achieve appropriate parameters for both the transmission over the distribution system and the power plant service power supply. The service power supply switchboards and cables provide supply to motors and other consumers necessary for the nuclear power plant technological process. The whole complex of equipment has to be maintained in good technical conditions. It is necessary to make thermovision and prophylactic measurements to identify and verify the electric equipment technical condition. The mentioned measurements warn the operation staff in advance against both gradual deterioration of power connection contact resistances, i.e. power connections overheating, and the machine insulation systems condition deterioration. The operation staff try to prevent the electric equipment operation accidents by early removing the detected failures, thus, improving the nuclear safety. In order to provide the above-mentioned activities a special prophylactic measurement group was established at the NPP Bohunice in 1983. The group specialists make following types of measurements. 1. Prophylactic measurements of electric machines. Prophylactics of 220 MW generators and 6 MW service power generators; Prophylactics of both unit and service transformers and VHV bushings; Prophylactics of major 6 kV motor drives. 2. Thermovision measurements of current connections. (Abstract Truncated)

  18. 47 CFR 80.1085 - Ship radio equipment-General.

    Science.gov (United States)

    2010-10-01

    ... SERVICES STATIONS IN THE MARITIME SERVICES Global Maritime Distress and Safety System (GMDSS) Equipment... maritime safety information service, as identified by the IMO GMDSS Master Plan Publication, is provided... Publication 117, or the Admiralty List of Radio Signals Volume 5 Global Maritime Distress and Safety System...

  19. Evidence-based approach to the maintenance of laboratory and medical equipment in resource-poor settings.

    Science.gov (United States)

    Malkin, Robert; Keane, Allison

    2010-07-01

    Much of the laboratory and medical equipment in resource-poor settings is out-of-service. The most commonly cited reasons are (1) a lack of spare parts and (2) a lack of highly trained technicians. However, there is little data to support these hypotheses, or to generate evidence-based solutions to the problem. We studied 2,849 equipment-repair requests (of which 2,529 were out-of-service medical equipment) from 60 resource-poor hospitals located in 11 nations in Africa, Europe, Asia, and Central America. Each piece of equipment was analyzed by an engineer or an engineering student and a repair was attempted using only locally available materials. If the piece was placed back into service, we assumed that the engineer's problem analysis was correct. A total of 1,821 pieces of medical equipment were placed back into service, or 72%, without requiring the use of imported spare parts. Of those pieces repaired, 1,704 were sufficiently documented to determine what knowledge was required to place the equipment back into service. We found that six domains of knowledge were required to accomplish 99% of the repairs: electrical (18%), mechanical (18%), power supply (14%), plumbing (19%), motors (5%), and installation or user training (25%). A further analysis of the domains shows that 66% of the out-of-service equipment was placed back into service using only 107 skills covering basic knowledge in each domain; far less knowledge than that required of a biomedical engineer or biomedical engineering technician. We conclude that a great majority of laboratory and medical equipment can be put back into service without importing spare parts and using only basic knowledge. Capacity building in resource-poor settings should first focus on a limited set of knowledge; a body of knowledge that we call the biomedical technician's assistant (BTA). This data set suggests that a supported BTA could place 66% of the out-of-service laboratory and medical equipment in their hospital back

  20. 77 FR 37078 - Product Change-Parcel Select and Parcel Return Service Negotiated Service Agreement

    Science.gov (United States)

    2012-06-20

    ... POSTAL SERVICE Product Change--Parcel Select and Parcel Return Service Negotiated Service... United States Postal Service[supreg] hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3... Postal Service to Add Parcel Select & Parcel Return Service Contract 4 to Competitive Product List...

  1. Radiation protection in radiology services in the municipality of Sao Paulo, SP, Brazil; Protecao radiologica nos servicos de radiologia do Municipio de Sao Paulo

    Energy Technology Data Exchange (ETDEWEB)

    Senise, Paulo H.; Silva, Ezequiel; Ruzene, Anderson A.; Braga, Adriano C.; Spirgatis, Armim, E-mail: paulo.senise@fidi.org.br, E-mail: ezequieI.siIva@fidi.org.br, E-mail: anderson.ruzene@fidi.org.br, E-mail: adriano.braga@fidi.org.br, E-mail: armim.spirgatis@fidi.org.br [Fundacao lnstituto de Pesquisa e Estudo de Diagnostico por Imagem (FIDI), Sao Paulo, SP (Brazil); Medeiros, Regina B., E-mail: regina.bitelli@fidi.org.br [Instituto de Pesquisa e Ensino em Medicina Diagnostica e Terapeutica (IPmed), Sao Paulo, SP (Brazil)

    2013-10-01

    The FIDI company providing service to local health care system is responsible for managing part of the services diagnostic imaging of Sao Paulo in the South and Southeast ( 60 % ), Eastern ( 20 % ) and Midwest (20 %), Brazil. The generation of images in the municipal net is performed in conventional manner. Since 2009 works a maintenance associated with the verification of the performance of radiological equipment (annual) and processing (monthly) one. In 2008, on the occasion of the agreement between the city hall and FIDI, conditions were evaluated for radiological protection in 52 care units of the municipality. Were carried out verification tests of performance in conventional equipment, mammographic and tomographic equipment, in 138 and 71 analog processors, according to current legislation. In 2008 , 33 % of the devices had technical problems that prevented its operation. Currently only 3.4 % of the 91 are in radiological equipment maintenance. In 2008 the majority of radiological equipment had more than 10 years of manufacturing, while today fixed equipment have been replaced by new ones and therefore the use of mammography and generally have 2 to 3 years of manufacture . Currently the 31 processors are operative in 2008, 28 % were out of order. The replacement of most of the equipment associated with program quality and preventive/corrective maintenance has kept the service in accordance with the law. (author)

  2. SecSLA: A Proactive and Secure Service Level Agreement Framework for Cloud Services

    OpenAIRE

    Fahad F. Alruwaili; T. Aaron Gulliver

    2014-01-01

    Cloud customers migrate to cloud services to reduce the operational costs of information technology (IT) and increase organization efficiency. However, ensuring cloud security is very challenging. As a consequence, cloud service providers find it difficult to persuade customers to acquire their services due to security concerns. In terms of outsourcing applications, software, and/or infrastructure services to the cloud, customers are concerned about the availability, integrity, privacy...

  3. 31 CFR 202.4 - Agreement of deposit.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Agreement of deposit. 202.4 Section 202.4 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE DEPOSITARIES AND FINANCIAL AGENTS OF THE FEDERAL...

  4. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  5. 78 FR 33864 - Negotiated Service Agreement

    Science.gov (United States)

    2013-06-05

    ... of Contents I. Introduction II. Notice of Filing III. Ordering Paragraphs I. Introduction On May 24... (Amendment). On May 28, 2013, the Postal Service filed the certified statement and supporting financial... docket. Id. The Supplement, filed several days later, contained the supporting financial documentation...

  6. 78 FR 33865 - Negotiated Service Agreement

    Science.gov (United States)

    2013-06-05

    ... of Contents I. Introduction II. Notice of Filing III. Ordering Paragraphs I. Introduction On May 24... (Amendment). On May 28, 2013, the Postal Service filed the certified statement and supporting financial... docket. Id. The Supplement, filed several days later, contained the supporting financial documentation...

  7. 78 FR 51757 - Negotiated Service Agreement

    Science.gov (United States)

    2013-08-21

    ... 202-789-6820. SUPPLEMENTARY INFORMATION: Table of Contents I. Introduction II. Background III. Contents of Filing IV. Commission Action V. Ordering Paragraphs I. Introduction On August 14, 2013, the... statement, and supporting financial workpapers. Id., Attachment 4 at 3. The Postal Service filed redacted...

  8. 78 FR 20360 - Negotiated Service Agreement

    Science.gov (United States)

    2013-04-04

    ... of Contents I. Introduction II. Notice of Filings III. Supplemental Information IV. Ordering Paragraphs I. Introduction On March 28, 2013, the Postal Service filed notice that it has agreed to an... coverage.'' Id. at 1. It states that ``the supporting financial documentation and financial certification...

  9. 76 FR 24026 - Federal Acquisition Regulation; Information Collection; Trade Agreements Certificate

    Science.gov (United States)

    2011-04-29

    ...; Information Collection; Trade Agreements Certificate AGENCY: Department of Defense (DOD), General Services... approved information collection requirement concerning trade agreements certificate. Public comments are...-mail [email protected] . SUPPLEMENTARY INFORMATION: A. Purpose Under the Trade Agreements Act of...

  10. Supply of equipment and components, materials of dedicated commercial grade, other services; Suministro de equipos y respuestos. Materiales de grado comercial dedicados. Otros servicios

    Energy Technology Data Exchange (ETDEWEB)

    Perdices, D.; Perez Medina, E.

    2014-10-01

    The following article describes the course of action of Tecnatom as Procurement Agent and Manufacturing Manager for the supply materials, equipment and components for the Spanish Nuclear Power Plants. We have devoted a special mention to the supply of dedicated commercial grade items (CGI), bringing together the services of Manufacturing Manager, Engineering service and testing facilities, simplifying the control of the supply chain with total warranty. (Author)

  11. 29 CFR 1203.3 - Interpretation of mediation agreements.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Interpretation of mediation agreements. 1203.3 Section 1203.3 Labor Regulations Relating to Labor (Continued) NATIONAL MEDIATION BOARD APPLICATIONS FOR SERVICE § 1203.3 Interpretation of mediation agreements. (a) Applications may be filed with the Board's Chief of...

  12. 40 CFR 82.158 - Standards for recycling and recovery equipment.

    Science.gov (United States)

    2010-07-01

    ... importers of recycling and recovery equipment intended for use during the maintenance, service, or repair of... recycling or recovery equipment at manufacturing facilities to ensure that each equipment model line that... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Standards for recycling and recovery...

  13. 49 CFR 604.8 - Leasing FTA funded equipment and drivers.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Leasing FTA funded equipment and drivers. 604.8... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CHARTER SERVICE Exceptions § 604.8 Leasing FTA funded equipment and drivers. (a) A recipient may lease its FTA-funded equipment and drivers to registered charter providers...

  14. 7 CFR 766.201 - Shared Appreciation Agreement.

    Science.gov (United States)

    2010-01-01

    ... requires a borrower to enter into a SAA with the Agency covering all real estate security when the borrower: (1) Owns any real estate that serves or will serve as loan security; and (2) Accepts a writedown in... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Servicing Shared Appreciation Agreements and Net...

  15. The negotiation of the new US/EURATOM co-operation agreement

    International Nuclear Information System (INIS)

    Kraemer, J.

    1992-01-01

    The current Agreements for Cooperation between the United States (U.S) and the countries of the European Community will expire on December 31, 1995. Several difficult issues concerning, inter alia, the application of U.S. consent rights over reprocessing of spent fuel and storage of plutonium in the Community and transfers of materials and equipment from the Community, stand between the negotiators and a successor agreement. The U.S. negotiators will likely use the recent Agreement with Japan, with its consent right/programmatic approval approach, as their model text. The Community negotiators are averse to accepting Agreement conditions that stem solely from requirements of U.S. legislation, and may seek technical or commercial benefits in return for any concessions they give. Both sides have compelling incentives to conclude a successor agreement, if only because the political and economic consequences of failure would be so severe. (author)

  16. 78 FR 49784 - Negotiated Service Agreement

    Science.gov (United States)

    2013-08-15

    .... SUPPLEMENTARY INFORMATION: Table of Contents I. Introduction II. Contents of Filing III. Commission Action IV. Ordering Paragraphs I. Introduction On August 8, 2013, the Postal Service filed notice, pursuant to 39 CFR... financial workpapers under seal. III. Commission Action The Commission reopens Docket No. CP2013-43 to...

  17. Regional trade agreements & procurement rules : facilitators or hindrances?

    OpenAIRE

    ANDERSON, Robert D.; MÜLLER, Anna Caroline; PELLETIER, Philippe

    2015-01-01

    This Working Paper considers the significance of government procurement chapters in regional trade agreements (RTAs), both in their own right and vis-à-vis the WTO Agreement on Government Procurement (GPA). The paper finds, inter alia, that: (i) a strong complementarity exists between government procurement trade commitments and general goods and services trade commitments, making integration of procurement commitments in a more general system such as the WTO Agreements desirable; (ii) govern...

  18. Test-retest reliability and agreement of the Satisfaction with the Assistive Technology Services (SATS) instrument in two Nordic countries.

    Science.gov (United States)

    Sund, Terje; Iwarsson, Susanne; Anttila, Heidi; Helle, Tina; Brandt, Ase

    2014-07-01

    The purpose of this study was to investigate test-retest reliability, agreement, internal consistency, and floor- and ceiling effects of the Danish and Finnish versions of the Satisfaction with the Assistive Technology Services (SATS) instrument among adult users of powered wheelchairs (PWCs) or powered scooters (scooters). Test-retest design, two telephone interviews 7-18 days apart of 40 informants, with mean age of 67.5 (SD 13.09) years in the Danish; and 54 informants with mean age of 55.6 (SD 12.09) years in the Finnish sample. The intra-class correlation coefficient varied between 0.57 and 0.93 for items in the Danish and between 0.41 and 0.93 in the Finnish sample. The percentage agreement varied between 54.2 and 79.5 for items in the Danish and between 69.2 and 81.1 in the Finnish sample, while the Cronbach's alpha values varied between 0.87 and 0.96 in the two samples. A ceiling effect was found in all items of both samples. This study indicates that the SATS may be reliably administered for telephone interviews among adult PWC and scooter users, and give information about aspects of the service delivery process for quality development improvement purposes. Further psychometric testing of the SATS is required.

  19. The Agreement between the Federal Republic of Germany and the Federative Republic of Brazil of 26 June 1975 on co-operation in the peaceful uses of nuclear energy

    International Nuclear Information System (INIS)

    Boulanger, W.

    1976-01-01

    The Agreement provides for co-operation between organizations engaged in scientific and technological research and enterprises in both States in the following: prospecting, extraction and processing of uranium ores as well as the production of uranium compounds; construction of nuclear reactors and other nuclear installations, as well as their components; uranium enrichment and enrichment services; manufacture of fuel elements and reprocessing of irradiated fuels. The Agreement is implemented by specific guidelines. In total, 8 nuclear power plants, one enrichment plant, one fuel element fabrication plant and a reprocessing plant are planned. The supply and export of nuclear materials, equipment and installations, as well as relevant technological information is subject to IAEA safeguards. (N.E.A.) [fr

  20. Procuring, maintaining and using equipment: the key issues in controlling exposure to patients

    International Nuclear Information System (INIS)

    Hendra, I.R.F.

    1989-01-01

    Not only are acceptance criteria directly related to the design of medical x-ray equipment and quality assurance exercised during its manufacture, but also its performance, safety and reliability must feature in requirements for procuring new equipment. In the UK this issue is dealt with under the Department of Health and Social Security Manufacturer Registration Scheme for Medical Equipment in its application to radiological equipment. In the UK quality of maintenance services has been considered by one of our Working Parties commissioned by the South-East Thames Regional Health Authority who are the ''Centre of Responsibility'' for diagnostic imaging equipment in the National Health Service. The report prepared from the first phase of activity of this working group describes features of a procurement specification for maintenance services and prescribes complementary duties of contractors and customers. Radiograph reject analysis has indicated human error outweighs unsatisfactory equipment performance as the reason for rejecting poor radiographs. The use in X-ray departments of the kind of manufacturing quality system used by most reputable equipment manufacturers has the potential for a dramatic reduction in exposure. (author)

  1. Mechanical (turbines and auxiliary equipment)

    CERN Document Server

    Sherry, A; Cruddace, AE

    2013-01-01

    Modern Power Station Practice, Volume 3: Mechanical (Turbines and Auxiliary Equipment) focuses on the development of turbines and auxiliary equipment used in power stations in Great Britain. Topics covered include thermodynamics and steam turbine theory; turbine auxiliary systems such as lubrication systems, feed water heating systems, and the condenser and cooling water plants. Miscellaneous station services, and pipework in power plants are also described. This book is comprised of five chapters and begins with an overview of thermodynamics and steam turbine theory, paying particular attenti

  2. Open manufacturing system using MMS service and object oriented manufacturing equipment

    International Nuclear Information System (INIS)

    Kim, Dong Hoon; Song, Jun Yeob; Kim, Sun Ho

    2007-01-01

    Manufacturing equipment should be integrated to construct CIM (Computer Integrated Manufacturing) environment, but several economical and technological difficulties may be arisen in case heterogeneous systems are integrated into each other. MMS (Manufacturing Message Specification) can be effective in such a case, but the problem is that MMS-related products are comparatively expensive and the existing manufacturing equipment mostly do not support MMS. This study was focused on developing a gateway suitable to a non-MMS-compatible CNC machine-tool, and on implementing OSI (Open System Interconnection) upper layer on TCP/IP. The development system was applied to a cell controller by means of heterogeneous equipment under CIM environment, and to evaluate interoperability and portability

  3. 21 CFR 1250.33 - Utensils and equipment.

    Science.gov (United States)

    2010-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... SANITATION Food Service Sanitation on Land and Air Conveyances, and Vessels § 1250.33 Utensils and equipment... of food or beverages, and the cleaning of food utensils, shall be so constructed as to be easily...

  4. Cooperative Agreement on Pesticide Safety Education

    Science.gov (United States)

    EPA is awarding the eXtension Foundation with a cooperative agreement to establish a system to distribute EPA funds to Pesticide Safety Education Programs (PSEPs) in State Cooperative Extension Services at Land Grant Universities.

  5. Alliances and partnering: A new relationship between oil/gas producing companies and service companies

    International Nuclear Information System (INIS)

    Gazi, N.H.; Hottman, W.E.; Logan, J.L.; Verrett, R.C.

    1995-01-01

    The current state of the energy industry finds both operating and service companies squeezed by lower prices and higher costs. Investment in exploration, equipment, and technology has been severely restricted. Many operators are responding to these harsh market conditions by re-engineering their work processes and focusing on core business activities. Re-engineered work processes encourage operators and service companies to work closely together. This motivates both to eliminate duplication, simplify processes, increase efficiency and capitalize on combined expertise to enhance production and optimize total system cost. Alliances and partnering are based on mutual trust and the commitment to add value to both organizations. Aligning interests is fundamental in establishing a lasting and mutually beneficial relationship. This paper presents an overview of these new relationships. The benefits and concerns of changing from traditional bidding agreements to new business arrangements between producing companies and service companies is discussed. Evaluation criteria for potential candidates, how to structure an alliance or partnering agreement, and a discussion of the key issues in the application of incentive contracts is presented

  6. 30 CFR 250.617 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.617 Section... Tubing and wellhead equipment. The lessee shall comply with the following requirements during well-workover operations with the tree removed: (a) No tubing string shall be placed in service or continue to...

  7. Hermann agreement updates IRS guidelines for incentives.

    Science.gov (United States)

    Broccolo, B M; Peregrine, M W

    1995-01-01

    The October 1994 agreement between the Internal Revenue Service (IRS) and Hermann Hospital of Houston, Texas, elucidates current IRS policy on physician recruitment incentives. The IRS distinguishes between the recruiting and the retention of physicians and perimts incentives beyond reasonable compensation in the former but not the latter circumstance. This new agreement, while not legally precedential, nevertheless provides guidance for healthcare organizations seeking safe harbor protection.

  8. Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL)

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:The Aircraft Wiring Support Equipment Integration Laboratory (AWSEIL) provides a variety of research, design engineering and prototype fabrication services...

  9. 10 CFR 603.680 - Purchase of real property and equipment by for-profit firms.

    Science.gov (United States)

    2010-01-01

    ... INVESTMENT AGREEMENTS Award Terms Affecting Participants' Financial, Property, and Purchasing Systems Property § 603.680 Purchase of real property and equipment by for-profit firms. (a) With the two exceptions... 10 Energy 4 2010-01-01 2010-01-01 false Purchase of real property and equipment by for-profit...

  10. 30 CFR 250.517 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.517 Section... Tubing and wellhead equipment. (a) No tubing string shall be placed in service or continue to be used unless such tubing string has the necessary strength and pressure integrity and is otherwise suitable for...

  11. 30 CFR 250.1626 - Tubing and wellhead equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.1626 Section... GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1626 Tubing and wellhead equipment. (a) No tubing string shall be placed into service or continue to be used unless such...

  12. Fuel Handling Equipment Maintenance for Critical Path Time Savings

    Energy Technology Data Exchange (ETDEWEB)

    Saville, M.; Williams, A.

    2015-07-01

    By sharing lessons learned and operating experience gained by AREVA Stearns RogerTM Services from more than 45 years of servicing, maintaining, and upgrading Fuel Handling Equipment (FHE) and as the original equipment manufacturer to 56% of domestic U.S. FHE (PWR and BWR) as well as 19 units overseas, this paper presents trends and market forces that have led to the neglect of FHE, the risks of not adequately maintaining FHE, and the financial benefits of proactively maintaining FHE. The benefit to audiences is to come to a better understanding of how critical path delays can be avoided and thus reduce nuclear power plant operating costs. Note that statistics and monetary values given herein are based on recent typical experiences of AREVA Stearns RogerTM Services. Examples discussed are based on actual lessons learned. For the purposes of this paper, upgrades are considered a part of equipment maintenance unless specifically discussed separately. (Author)

  13. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  14. 75 FR 52378 - International Product Change-United States Postal Service Inbound Market-Dominant Multi-Service...

    Science.gov (United States)

    2010-08-25

    ... POSTAL SERVICE International Product Change--United States Postal Service Inbound Market-Dominant... Inbound Market-Dominant Multi- Service Agreements to the Market-Dominant Products List pursuant to 39 U.S... the Postal Regulatory Commission to Add Market-Dominant Multi-Service Agreements with Foreign Postal...

  15. 21 CFR 226.30 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contamination, including cross-contamination from manufacturing operations. (d) Be suitably grounded... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 226.30 Section 226.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL...

  16. Evaluating technology service options.

    Science.gov (United States)

    Blumberg, D F

    1997-05-01

    Four service and support options are available to healthcare organizations for maintaining their growth arsenals of medical and information technology. These options include maintaining and servicing all equipment using a facility-based biomedical engineering and MIS service department; using a combination of facility-based service and subcontracted service; expanding facility-based biomedical and MIS service departments to provide service to other healthcare organizations to achieve economies of scale; and outsourcing all maintenance, repair, and technical support services. Independent service companies and original equipment manufacturers (OEMs) are offering healthcare organizations a wider array of service and support capabilities than ever before. However, some health systems have successfully developed their own independent service organizations to take care of their own--and other healthcare organizations'--service and support needs.

  17. Decision Support Procedure for Medical Equipment Maintenance Management

    NARCIS (Netherlands)

    Masmoudi, Malek; Houria, Zeineb Ben; Al Hanbali, Ahmad; Masmoudi, Faouzi

    2016-01-01

    Hospitals outsource several activities of the service support in order to focus on the core healthcare production as maintenance service. Recently, faced to the sophistication and the costs of medical equipment that continue to escalate, governments have implemented new reforms to control costs and

  18. Concerning some problems of heavy equipment maintenance in the Maritsa-Iztok Combine

    Energy Technology Data Exchange (ETDEWEB)

    Khristov, B

    1979-09-01

    Discusses low quality of repairs on mining equipment which causes extensive periods of idleness. The central service base at Radnevo not only lacks capacity to do repairs on heavy excavating equipment but is also poorly equipped with mobile cranes and service trucks to keep up adequate maintenance activity at working sites. Limited supply of spare parts is partly due to decreasing imports and partly to the lack of production facilities at the central service base. Undue delays are also caused by a lack of access roads, for example, the Troyanovo 1 mine cannot be reached by road even during the summer season. There are constant fluctuations of technical personnel and the number of specialists remaining past their first contract period is decreasing. Integration of all maintenance and repair operations, establishment of advanced training facilities and more economic use of equipment is recommended. (In Bulgarian)

  19. NOW ON THE WEB SALES AND PURCHASE OF OBSOLETE OR SURPLUS EQUIPMENT

    CERN Multimedia

    2000-01-01

    The Recuperation and Sales Service wishes to recall that obsolete or surplus equipment which is no longer needed at CERN may be sold to outside institutes, members of the personnel, companies, etc. For this purpose an 'on-line sales and purchase tool' has been developed and installed on the web: consult the 'Recuperation and Sales Service' site on the CERN homepage. Users wishing to eliminate or sell obsolete or surplus equipment are invited to use the tool to issue an 'on-line sales request' and users who are looking for cheap 2nd hand equipment may consult the 'on-line sales catalogue' and make 'on-line purchase bids'. The direct sale of low value equipment, which takes place Thursdays 13h30 ­ 15h30 in the Recuperation Centre, building 133, will continue as before. For more information contact the Recuperation & Sales Service, tel. 75782 or 78665.

  20. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  1. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  2. 45 CFR 1304.53 - Facilities, materials, and equipment.

    Science.gov (United States)

    2010-10-01

    ... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND... development of each child. (2) Grantee and delegate agencies must provide appropriate space for the conduct of... meet the needs and facilitate the participation of children and adults. Equipment, toys, materials, and...

  3. Calculating the price of tanks, vessels and process equipment of petrochemical industry second criteria of integrity and survival remaining of API RP 579 (Fitness for service); Calculo do preco de tanques, vasos e equipamentos de processo da industria petroquimica segundo criterios de integridade e sobrevida remanescente do API RP 579 (Fitness for service)

    Energy Technology Data Exchange (ETDEWEB)

    Morato, Paulo Cesar Vidal Morato [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    By owning many tanks, vessels and process equipment, PETROBRAS has developed the concept of 'Fitness-For-Service' (suitability for use) under the standard API RP 579, i.e. to verify the structural integrity and remaining useful life of equipment in service. In this paper we will discuss how to calculate the remaining useful life of equipment used in accordance with such criteria and with this technical data, calculate the depreciated price. Steps: verification of applicability; surveys of the technical data of the equipment; surveys the minimum thickness of plating equipment over the years; calculation of the average annual rate of corrosion (tc); calculation of the required minimum thickness according to the criteria of API RP 579 (tr); calculation of remaining useful life (nr); calculation of the depreciated price (Vd) equipment. Conclusions: intended for evaluation of tanks price, vessels and process equipment according to API RP 579 concepts. Estimate the remaining useful life of equipment used and calculates the depreciated price. Scientific method based, consistent and robust, due to calculating established the remaining useful life. (author)

  4. The U.S.-Singapore Free Trade Agreement: Effects After Five Years

    Science.gov (United States)

    2010-03-26

    U.S. service providers in Singapore under the FTA , Citibank has been able to expand its operations there (it has 50% of the credit card market...failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 26 MAR 2010 2. REPORT...U.S.-Singapore Free Trade Agreement: Effects After Five Years Congressional Research Service Summary The U.S.-Singapore Free Trade Agreement ( FTA

  5. Electrical equipment design library

    International Nuclear Information System (INIS)

    1994-01-01

    This book guides the design supervision, construction order for electrical equipment. The contents of this library are let's use electricity like this, leading-in-pole and casual power, electric pole install below 300KVA, electric pole install below 301∼1000KVA, electric pole install exceed 1000KVA, rooftop install exceed 1000KVA, CUBICLE type, 154KV services. It adds an appendix.

  6. 7 CFR 4285.2 - Cooperative agreement purposes.

    Science.gov (United States)

    2010-01-01

    ... agency to: (a) Conduct marketing research related to agricultural cooperatives. (b) Assist other organizations in conducting marketing research related to agricultural cooperatives. ... RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE COOPERATIVE AGREEMENTS Federal-State Research on...

  7. Network effects in the operation of electrical equipment; Efectos de la red en la operacion del equipo electrico

    Energy Technology Data Exchange (ETDEWEB)

    Garcia T, Arturo; Rosales S, Inocente; Garcia P, Job; Ruiz F, L. Ivan; Robles P, Edgar [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2005-07-01

    In the nineties, the Instituto de Investigaciones Electricas (IIE) Electrical Equipment Management (GEE) was restricted to make the diagnosis of generators, transformers, switch boards and cables, without considering the global operating conditions. With the experience acquired in different services it was verified that, inclusively when this equipment is correctly designed, it can be subjected to unfavorable operative conditions, which causes an accelerated deterioration to the degree of producing a fault. In agreement with this, the GEE settled down new line of development named Analysis of the network effect on the electrical equipment, that analyzes the behavior of the equipment originated by work abnormal causes, including the network configuration effect. [Spanish] En la decada de los noventa, la Gerencia de Equipos Electricos (GEE) del IIE se limitaba a realizar el diagnostico de generadores, transformadores, tableros de distribucion y cables, sin considerar las condiciones globales de operacion. Con la experiencia adquirida en diferentes servicios se comprobo que, inclusive cuando estos equipos esten correctamente disenados, pueden verse sometidos a condiciones de operacion desfavorables, lo que ocasiona un deterioro acelerado al grado de producir una falla. De acuerdo con esto, la GEE establecio una nueva linea de desarrollo de nominada Analisis del efecto de la red en los equipos electricos, que analiza el comportamiento de los equipos originado por causas anormales de trabajo, incluido el efecto de la configuracion de la red.

  8. Satellite services system overview

    Science.gov (United States)

    Rysavy, G.

    1982-01-01

    The benefits of a satellite services system and the basic needs of the Space Transportation System to have improved satellite service capability are identified. Specific required servicing equipment are discussed in terms of their technology development status and their operative functions. Concepts include maneuverable television systems, extravehicular maneuvering unit, orbiter exterior lighting, satellite holding and positioning aid, fluid transfer equipment, end effectors for the remote manipulator system, teleoperator maneuvering system, and hand and power tools.

  9. Evaluation of conventional x-ray diagnostic equipment and radiological protection systems of hospitals and clinics installed in Recife city, Brazil

    International Nuclear Information System (INIS)

    Passos, Robson Silva

    1999-05-01

    Diagnostic radiology is the main contributor to the man-made exposure of general population. Since Quality Assurance (QA) programs ensure high quality diagnostic images with the lowest possible radiation dose to the patient, it has been recommended that all introduce QA programs for their radiological facilities. Consequently it is important to check the adequacy of equipment operating parameters in diagnostic radiography facilities, to ensure that a high quality of service is delivered. The purpose of this study was to evaluate the operating conditions of diagnostic units installed in Recife, Pernambuco. The study included 31 X-ray units from both public and private diagnostic services. The following parameters were evaluated: coincidence between the luminous and radiation fields; alignment of the radiation beam; agreement between the real and preset values of kVp and exposure time; filtration; half value lower (HVL); luminance of the view box; uniformity of the luminance; illuminance of the environment. The results showed that 20% of the equipment surveyed exhibited discrepancies between the luminous and radiation fields greater than 2% of the source to skin distance. The test of kilovoltage showed that 48% of the units do not fulfill the acceptability criteria, presenting discrepancies higher than ± 10% between the measured and preset values. The results of the accuracy of the timer indicated that 81% of the equipment surveyed present a discrepancy greater than ± 10% between the time selected in the control panel and actual exposure time.The test of the filtration shown that, in 20% of the equipment, this was inferior to 2,5 mm Al. The test of the luminance of view box shown that 96% of the equipment, shown a luminance lower of 2.000 cd/m 2 . Related to the test of the uniformity of the luminance, 81 % of the equipment shown a variation of the uniformity higher then 10%. The test of the iluminancy of the environment shown that 61 % of the equipment presented

  10. 36 CFR 254.4 - Agreement to initiate an exchange.

    Science.gov (United States)

    2010-07-01

    ... exchange. 254.4 Section 254.4 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE LANDOWNERSHIP ADJUSTMENTS Land Exchanges § 254.4 Agreement to initiate an exchange. (a) Exchanges may be proposed by the Forest Service or by any person, State, or local government. Initial exchange proposals...

  11. Cost-benefit analysis on radiotherapy services for cancer treatment, with LINAC type equipments (linear accelerators

    Directory of Open Access Journals (Sweden)

    Luiz Alberto Blois

    2014-12-01

    Full Text Available This work consists in analyzing the economic feasibility of the investment to implement a Radiotherapy sector for radiological of cancer treatment by type linear accelerators equipments, based on the case of a public hospital in São Paulo. From technical and financial details of the project and the survey reference values for health care to their procedures, the statistical outcome of treatment on patients' life expectancy and average income indicators of the state's population, were estimated to income (private and social and expenses of this health service and other elements that make up the flow of the investment project box. From these estimates we evaluated public and private investment return, ie, if it fits only on the public sector or if private sector could also implement this projects geared exclusively to free admittance.

  12. Design of experimental equipment at CRNL

    International Nuclear Information System (INIS)

    Godden, B.

    1976-01-01

    The Plant Design Division provides a design service to the research and development effort at CRNL. Severe constraints, both environmentally and spatially, are placed on the design of special equipment. Several examples are given. Finally, the use of automated drafting systems is described. (author)

  13. US service firms eye increased sales to Mexico

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports on American service supply companies which hope the pending U.S.-Mexico free trade agreement will step up their sales of goods and service to Petroleos Mexicanos. They testified at a House foreign affairs subcommittee hearing on the oil aspects of the FTA and commented on a recent General Accounting Office report. Rep. Sam Gejdenson, (D-Conn.), subcommittee chairman, has been critical of FTA negotiations because it appears they will not open the Mexican oil sector to U.S. firms. Mexico's constitution bans foreign firms from owning Mexican reserves. It has been stated that the U.S. oil industry needs the business. The industry, particularly drillers, contractors, and manufacturers of oil equipment, has been hurting for more than 10 years now. They have lost more than 356,000 jobs in this sector in the last decade more than have been lost in the entire U.S. auto industry. Access to trade and investment in Mexico's oil sector could mean the difference between profit and bankruptcy for tens of thousands of small and medium size oil service contractors

  14. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-03-01

    Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for approval within 60 days, or in some cases, within 90 days, of the effective date of the agreement

  15. Franchise Agreements and Clean Energy: Issues in Illinois

    Science.gov (United States)

    This project evaluates the impact on energy efficiency of municipal franchise agreements that supply electricity or gas service without a direct charge (unbilled energy) for certain municipal government facilities in Illinois.)

  16. Overview of statistical methods, models and analysis for predicting equipment end of life

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    Utility equipment can be operated and maintained for many years following installation. However, as the equipment ages, utility operators must decide whether to extend the service life or replace the equipment. Condition assessment modelling is used by many utilities to determine the condition of equipment and to prioritize the maintenance or repair. Several factors are weighted and combined in assessment modelling, which gives a single index number to rate the equipment. There is speculation that this index alone may not be adequate for a business case to rework or replace an asset because it only ranks an asset into a particular category. For that reason, a new methodology was developed to determine the economic end of life of an asset. This paper described the different statistical methods available and their use in determining the remaining service life of electrical equipment. A newly developed Excel-based demonstration computer tool is also an integral part of the deliverables of this project.

  17. 47 CFR 15.305 - Equipment authorization requirement.

    Science.gov (United States)

    2010-10-01

    ... Section 15.305 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL RADIO FREQUENCY DEVICES Unlicensed Personal Communications Service Devices § 15.305 Equipment authorization requirement. PCS devices... 2 of this chapter before marketing. The application for certification must contain sufficient...

  18. Regulation EM-GT-8. Guidance for quality control of mammography equipment

    International Nuclear Information System (INIS)

    2015-01-01

    Objective: To provide practical guidance of technical procedures for carrying out quality control in mammography equipment. Scope: This guide applies to mammography equipment. A number of methods which require the appointed instrumentation described, some of which can be implemented in radiology services own country given the low complexity of themselves and others that require specific equipment and can be performed by specialized groups external to these units. The guide does not constitute a mandatory, however, the parameters evaluated according to the tests described therein and their tolerances form the basis of regulations that establish the CCEEM about these teams. Overview: The success of mammographic studies depends on obtaining high-quality images combined with a low rate of patient dose. To ensure this objective the establishment of quality assurance programs on all aspects involving these services is necessary. This guide provides a number of quality control procedures aimed at x-ray equipment, which must be performed at least on an annual basis or when some maintenance occurs at x-ray equipment.

  19. 7 CFR Exhibit A to Subpart Jj of... - Agreement Form

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Agreement Form A Exhibit A to Subpart JJ of Part 2045...) ADMINISTRATIVE REGULATIONS GENERAL Rural Development-Utilization of Gratuitous Services Pt. 2045, Subpt. JJ, Exh. A Exhibit A to Subpart JJ of Part 2045—Agreement Form for utilization of employees of (official...

  20. The contractual agreement State-EDF signature the 8. april 1997

    International Nuclear Information System (INIS)

    1998-01-01

    The corporation agreement between the State and Electricite De France (EDF) was signed for the period of 1997-2000. With the agreement of the State, this new contract brings to EDF the ways to progress: becoming the reference public utilities in Europe and asserting its authority as an industrial corporation, leader of the electrical service in France and in international markets. The agreement precise the main orientations of the development plan and the economical policy. (A.L.B.)

  1. Outdoor Power Equipment Technician: Apprenticeship Course Outline. Apprenticeship and Industry Training. 5111.1

    Science.gov (United States)

    Alberta Advanced Education and Technology, 2011

    2011-01-01

    The graduate of the Outdoor Power Equipment Technician apprenticeship program is a certified journeyperson who will be able to: (1) supervise, train and coach apprentices; (2) service, maintain, repair and rebuild outdoor power equipment and outdoor power equipment accessories; (3) communicate clearly with customers, staff, suppliers, as required;…

  2. Agency Agreements Process Champion Support Intern

    Science.gov (United States)

    Miksa, Ember

    2018-01-01

    This document will provide information on the 2018 Spring semester NIFS Intern who represented the Office of Chief Financial Officer (OCFO) as a Reimbursable Accountant at Kennedy Space Center (KSC). This intern supported the Agency Agreements Process Champions and Team Lead, Susan Kroskey, Sandy Massey and Mecca Murphy, with major initiatives to advance the KSC OCFO's vision of creating and innovating healthy financial management practices that maximize the value of resources entrusted to NASA. These initiatives include, but are not limited to: updating the Agency Guidance and NASA Procedural Guidance 9090.1 Agreements, implementing a new budget structure to be utilized across all centers, submitting a Call Request (CRQ) to enhance non-federal customer reporting, initiating a discussion to incorporate a 3-year funding program for NASA agreements, and undertaking the Office of Inspector General (OIG) Audit. In support of these initiatives, this intern identified technical methods to enhance and reduce the workload of financial processes for reimbursable and non-reimbursable agreements, prepared reports in support of accounting functions, and performed administrative work and miscellaneous technical tasks in support of the OCFO as requested. In conclusion of the internship, the intern will become knowledgeable on reimbursable accounting, reimbursable policy, types of reimbursable agreements, the agreements process, estimated pricing reports, and the roles and responsibilities of the Financial Accounting and Financial Services offices.

  3. International Telecommunications Satellite Organization (INTELSAT) Agreement Between the United States of American and Other Governments and Operating Agreement.

    Science.gov (United States)

    Department of State, Washington, DC.

    The INTELSAT (International Telecommunications Satellite) agreement was reached because of the desirability of continuing the development of a telecommunications satellite system. INTELSAT's aim was to achieve a single global commercial system as part of an improved global telecommunications network which will provide expanded services to all…

  4. Integrating HIV care and treatment into primary healthcare: Are clinics equipped?

    Directory of Open Access Journals (Sweden)

    Talitha Crowley

    2014-01-01

    Full Text Available Background: The demand for HIV care and treatment services is increasing rapidly and strategies to sustain long-term care should be employed. The decentralisation and integration of HIV care and treatment services into primary healthcare (PHC is vitally important in order to ensure optimal access to life-saving antiretroviral therapy and ongoing chronic care. Conversely, the PHC system is fraught with the current burden of disease. Setting: The study was conducted in PHC clinics in the uMgungundlovu district, Kwa-Zulu Natal.Aim: The objectives of the study were to assess whether PHC clinics were equipped to deliver integrated HIV services and to evaluate the availability of resources as well as support systems for HIV care and treatment in PHC clinics.Methods: A quantitative, cross-sectional descriptive study was undertaken in 20 randomly-selected, eligible clinics in the uMgungundlovu district, KwaZulu-Natal, South Africa. An evaluation instrument was completed through observations and review of the clinic data records. Criteria were based on the World Health Organization’s guide to indicators for antiretroviral programmes as well as South African HIV standards for PHC facilities.Results: None of the clinics were equipped adequately. Clinics with a higher patient load had poorer scores, whilst clinics providing antiretroviral therapy were better equipped in terms of human resources and infrastructure.Conclusion: HIV services are an essential part of primary healthcare and clinics need to be equipped adequately in order to render this service. It is unlikely that the over-burdened health system would be able to cope with an increased number of patients on antiretroviral therapy in the long term, whilst maintaining quality of services, without support being given to PHC clinics.

  5. Integrating HIV care and treatment into primary healthcare: Are clinics equipped?

    Directory of Open Access Journals (Sweden)

    Talitha Crowley

    2014-08-01

    Full Text Available Background: The demand for HIV care and treatment services is increasing rapidly and strategies to sustain long-term care should be employed. The decentralisation and integration of HIV care and treatment services into primary healthcare (PHC is vitally important in order to ensure optimal access to life-saving antiretroviral therapy and ongoing chronic care. Conversely, the PHC system is fraught with the current burden of disease. Setting: The study was conducted in PHC clinics in the uMgungundlovu district, Kwa-Zulu Natal. Aim: The objectives of the study were to assess whether PHC clinics were equipped to deliver integrated HIV services and to evaluate the availability of resources as well as support systems for HIV care and treatment in PHC clinics. Methods: A quantitative, cross-sectional descriptive study was undertaken in 20 randomly-selected, eligible clinics in the uMgungundlovu district, KwaZulu-Natal, South Africa. An evaluation instrument was completed through observations and review of the clinic data records. Criteria were based on the World Health Organization’s guide to indicators for antiretroviral programmes as well as South African HIV standards for PHC facilities. Results: None of the clinics were equipped adequately. Clinics with a higher patient load had poorer scores, whilst clinics providing antiretroviral therapy were better equipped in terms of human resources and infrastructure. Conclusion: HIV services are an essential part of primary healthcare and clinics need to be equipped adequately in order to render this service. It is unlikely that the over-burdened health system would be able to cope with an increased number of patients on antiretroviral therapy in the long term, whilst maintaining quality of services, without support being given to PHC clinics.

  6. Design guide for heat transfer equipment in water-cooled nuclear reactor systems

    International Nuclear Information System (INIS)

    1975-07-01

    Information pertaining to design methods, material selection, fabrication, quality assurance, and performance tests for heat transfer equipment in water-cooled nuclear reactor systems is given in this design guide. This information is intended to assist those concerned with the design, specification, and evaluation of heat transfer equipment for nuclear service and the systems in which this equipment is required. (U.S.)

  7. F/H Area high level waste removal plan ampersand schedule as required by the Federal Facility Agreement for the Savannah River Site

    International Nuclear Information System (INIS)

    Hunter, M.A.

    1993-11-01

    The F and H-area HLW Tank Farms are one component of a larger integrated waste treatment system consisting of facilities designed for the overall processing of several radioactive waste streams resulting from nuclear material processing. Section IX.E of the SRS Federal Facility Agreement requires the DOE to submit to the EPA and SCDHEC for review and approval, a plan(s) and schedule(s) for the removal from service of waste tank systems(s)/component(s) that do not meet secondary containment standards, or that leak or have leaked. The Plan and Schedule for removal from service of these waste tanks is shown in Appendices A and B, respectively. Other portions of this package which include schedule dates are provided for information only. The SRS intends to remove systems from service as opposed to providing secondary containment for non-compliant systems. The systems that do not meet secondary containment requirements or that have leaked (as determined by tank assessment reports) include High Level Waste Tanks No. 1--24 along with corresponding ancillary equipment

  8. 18 CFR 367.3930 - Account 393, Stores equipment.

    Science.gov (United States)

    2010-04-01

    ... ACT Service Company Property Chart of Accounts § 367.3930 Account 393, Stores equipment. (a) This... materials and supplies. (b) This account must include the following items: (1) Chain falls. (2) Counters. (3...

  9. Longevity and Depreciation of Audiovisual Equipment.

    Science.gov (United States)

    Post, Richard

    1987-01-01

    Describes results of survey of media service directors at public universities in Ohio to determine the expected longevity of audiovisual equipment. Use of the Delphi technique for estimates is explained, results are compared with an earlier survey done in 1977, and use of spreadsheet software to calculate depreciation is discussed. (LRW)

  10. 7 CFR 1260.144 - Nominee's agreement to serve.

    Science.gov (United States)

    2010-01-01

    ....144 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE BEEF PROMOTION AND RESEARCH Beef Promotion and Research Order Cattlemen's Beef Promotion and Research Board...

  11. 10 CFR 603.535 - Value of proposed real property or equipment.

    Science.gov (United States)

    2010-01-01

    ... AGREEMENTS Pre-Award Business Evaluation Cost Sharing § 603.535 Value of proposed real property or equipment. The contracting officer rarely should accept values for cost sharing contributions of real property or...-profit participants. The contracting officer may accept the full value of a donated capital asset if the...

  12. Design of EPON far-end equipment based on FTTH

    Science.gov (United States)

    Feng, Xiancheng; Yun, Xiang

    2008-12-01

    Now, most favors fiber access is mainly the EPON fiber access system. Inheriting from the low cost of Ethernet, usability and bandwidth of optical network, EPON technology is one of the best technologies in fiber access and is adopted by the carriers all over the world widely. According to the scheme analysis to FTTH fan-end equipment, hardware design of ONU is proposed in this paper. The FTTH far-end equipment software design deference modulation design concept, it divides the software designment into 5 function modules: the module of low-layer driver, the module of system management, the module of master/slave communication, and the module of main/Standby switch and the module of command line. The software flow of the host computer is also analyzed. Finally, test is made for Ethernet service performance of FTTH far-end equipment, E1 service performance and the optical path protection switching, and so on. The results of test indicates that all the items are accordance with technical request of far-end ONU equipment and possess good quality and fully reach the requirement of telecommunication level equipment. The far-end equipment of FTTH divides into several parts based on the function: the control module, the exchange module, the UNI interface module, the ONU module, the EPON interface module, the network management debugging module, the voice processing module, the circuit simulation module, the CATV module. In the downstream direction, under the protect condition, we design 2 optical modules. The system can set one group optical module working and another group optical module closure when it is initialized. When the optical fiber line is cut off, the LOS warning comes out. It will cause MUX to replace another group optical module, simultaneously will reset module 3701/3711 and will make it again test the distance, and will give the plug board MPC850 report through the GPIO port. During normal mode, the downstream optical signal is transformed into the

  13. 42 CFR 137.55 - What is the term of a funding agreement?

    Science.gov (United States)

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Funding Agreements Term of A... term mutually agreed to by the parties. Absent notification from an Indian Tribe that it is withdrawing...

  14. E.B.R.O. 499 Union Gas settlement agreement

    International Nuclear Information System (INIS)

    1998-01-01

    This alternative dispute resolution agreement is for the consideration of the Ontario Energy Board in its determination of the 1999 rates for Union Gas Limited, under Docket No. E.B.R.O. 499. The agreement is supported by the evidence filed in E.B.R.O. 499. The topics discussed in this report are administration policy, rate base, operating revenue, cost of service, cost of capital, cost allocations, and rate design

  15. Agreements

    International Nuclear Information System (INIS)

    2001-01-01

    These columns summarize the different bilateral and multilateral agreements concluded recently between the different OECD countries and concerning the nuclear energy domain: Argentina - Australia: Agreement concerning Co-operation in the Peaceful Uses of Nuclear Energy (2001). Argentina - Brazil: Joint Declaration regarding the Creation of the Argentinean-Brazilian Agency for Nuclear Energy Applications (2001). Australia - Czech Republic / Australia - Hungary: Agreements on Co-operation in Peaceful Uses of Nuclear Energy and the Transfer of Nuclear Material (2001). Australia - Indonesia: Arrangement Concerning Co-operation on Nuclear Safeguards and Related Matters (2001). Austria - Switzerland: Agreement on the Early Exchange of Information in the Field of Nuclear Safety and Radiation. Brazil - United States: Extension of the Agreement concerning Research and Development in Nuclear Material Control, Accountancy, Verification, Physical Protection, and Advanced Containment and Surveillance Technologies for International Safeguards Applications (2001). Czech Republic - Republic of Korea: Agreement for Co-operation in the Peaceful Uses of Nuclear Energy (2001). European Union- Russian Federation: Agreements on Nuclear Safety and Controlled Nuclear Fusion (2001). France - United States: Agreement for Co-operation in Advanced Nuclear Reactor Science and Technology (2001). Japan - United Kingdom: Co-operation Agreement on Advanced Nuclear Fuel Cycle, Fast Breeder Reactor and Other Related Technologies (2001). Republic OF Korea - United States: Annex IV Joint Project on Cintichem Technology (2000). Morocco - United States: Protocol amending the Co-operation Agreement on the Peaceful Uses of Nuclear Energy (2001). Multilateral Agreements: Agreement for Information Exchange on Radiological Surveillance in Northern Europe (2001). Status of Conventions in the Field of Nuclear Energy. (author)

  16. Supporting developers in addressing maintenance aspects: an empirical study in the industrial equipment manufacturing industry

    NARCIS (Netherlands)

    Mulder, W.

    2016-01-01

    Addressing maintenance aspects has become increasingly important in development projects of industrial equipment. Developers of such equipment need to address the maintenance aspects in order to achieve competitive equipment and service offerings. This research focuses on the identification of the

  17. Service Level Agreement for the QoS Guaranteed Mobile IPTV Services over Mobile WiMAX Networks

    OpenAIRE

    Chowdhury, Mostafa Zaman; Trung, Bui Minh; Jang, Yeong Min; Kim, Young-Il; Ryu, Won

    2011-01-01

    While mobile IPTV services are supported through the mobile WiMAX networks, there must need some guaranteed bandwidth for the IPTV services especially if IPTV and non-IPTV services are simultaneously supported by the mobile WiMAX networks. The quality of an IPTV service definitely depends on the allocated bandwidth for that channel. However, due to the high quality IPTV services and to support of huge non-IPTV traffic over mobile WiMAX networks, it is not possible to guarantee the sufficient ...

  18. Specification and acceptance testing of nuclear medicine equipment

    International Nuclear Information System (INIS)

    Wegst, A.V.; Erickson, J.J.

    1984-01-01

    The purchase of nuclear medicine equipment is of prime importance in the operation of a clinical service. Failure to properly evaluate the potential uses of the instrumentation and the various operational characteristics of the equipment can often result in the purchase of inappropriate or inferior instruments. The magnitude of the purchase in terms of time and financial investments make it imperative that the purchase be approached in a systematic manner. Consideration of both the intended clinical functions and personnel requirements is important. It is necessary also to evaluate the ability of the equipment vendor to support the instrumentation after the purchase has been completed and the equipment installed in the clinical site. The desired specifications of the instrument characteristics should be stated in terms that can be verified by acceptance testing. The complexity of modern instrumentation and the sensitivity of it to the environment require the buyer to take into account the potential problems of controlling the temperature, humidity, and electrical power of the installation site. If properly and systematically approached, the purchase of new nuclear medicine instrumentation can result in the acquisition of a powerful diagnostic tool which will have a useful lifetime of many years. If not so approached, it may result in the expenditure of a large amount of money and personnel time without the concomitant return in useful clinical service. (author)

  19. Development of customer information network system. Part 3. Development of power controller (customer side equipment) for advanced customer service and remote processing of conventional customer service; Juyoka joho network no kaihatsu. 3. Juyoka taio gyomu no enkaku shori to aratana juyoka service no tame no denryoku controller no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Yoshimitsu, T. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1996-06-01

    To offer remote processing of the conventional customer service and advanced customer service using information network, customer side equipment, power controller, was manufactured as a trial. For inspecting the power meter by remote processing, watt-hour meter placed outside was moved into house, to integrate an indoor distribution board consisting of a breaker for contract, earth leakage breaker and branch breaker by adding functions of communication, equipment monitoring and control and functions of display and operation. When detecting fault, installed CPU (central processing unit) or DSP (digital signal processor) stops its operation and each breaker keeps its state as before the fault. Thus, there is no problem for power supply. This system has a battery to maintain and operate at least the display function in the case of outage. Advanced customer service functions could be added without a large cost. To increase understanding of customers concerning electric power saving and electric power itself, consuming electric energy and current are displayed at each branch. Outage of the whole house can be avoided by the rapid detection and removal of the earth leakage branch line. 14 refs., 14 figs., 3 tabs.

  20. Acceleration toward the conclusion negotiation of bilateral nuclear cooperation agreements indispensable for globalization

    International Nuclear Information System (INIS)

    Mitsumata, Hiroki; Hattori, Takuya; Ake, Yutaka

    2011-01-01

    According to Japan's basic policies of new growth strategy, it would be one option of the economic growth to increase exports of nuclear power plant system or its equipments. However, bilateral nuclear cooperation agreements are indispensable for business activities on nuclear power. Recently signature of agreement with Jordan, agreed conclusion negotiation with Vietnam and Korea, under negotiation with India and expected negotiation with Indonesia and Malaysia. Signed agreements with Russia and Kazakhstan will be coming into effect and contribute nuclear fuel supply at export of nuclear power system. This special article consists of four expert's papers titled as (1) necessity of conclusion negotiation of nuclear cooperation agreements with several countries simultaneously and in parallel, (2) Japan's nuclear cooperation in new era, (3) desirable acceleration of conclusion negotiation of nuclear cooperation agreements and (4) insurance of nuclear fuel supply fundamental for global business activities of Japan's nuclear industries-best choice to establish cooperative relations with US and Russia. (T. Tanaka)

  1. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  2. Energy saving potential of energy services - experimentation on the life cycle of energy conversion equipment

    International Nuclear Information System (INIS)

    Dupont, M.

    2006-12-01

    Energy efficiency services are growing in Europe but their role is still limited. In order to evaluate the potential, we focused first of all on policy, economical and environmental mechanisms that support their development. European natural gas and electricity markets, that are now almost wholly de-regulated, are analysed and compared to their historical structure. By introducing uncertainty on energy prices, this new deal translates better the real energy costs. Energy performance contracts (EPC) limit the impact of these uncertainties on the customer energy bills by guaranteeing a financial result. As a result of the modelling of these contracts, namely operation and maintenance ones, we prove that they transfer technical and financial risks from building owners to energy service companies (ESCO) making energy saving measures easier and less expensive at the same time. These contracts are relatively widespread for heating or compressed-air processes but remain marginal for air-conditioning systems. So new methods were needed to guarantee on the long terms the efficiency of air-conditioning systems demand (1) to master the process and its performances and (2) to be able to determine precisely the energy saving potential and its realisation costs. A detailed energy audit is thus necessary for which we propose a guidance. Conclusions of audits carried out prove that energy saving potential is mainly located in equipment management and control. These optimizations are not always carried out because of a lack of contractual incentive and due to the weaknesses of audit methods. Through the involvement of an independent expert, the mandatory and regular inspection of air-conditioning systems may allow to verify and guide such practices. A three-step analysis procedure has been developed in order to maximize the inspection potential and to get higher benefits from service contracts. (author)

  3. 76 FR 17653 - Notice of Agreements Filed

    Science.gov (United States)

    2011-03-30

    ...: CSCL/ELJSA Vessel Sharing Agreement-Asia and Mexico, US East Coast Service. Parties: China Shipping Container Lines Co., Ltd.; China Shipping Container Lines (Hong Kong) Co., Ltd.; and Evergreen Lines Joint... coordinate sailings in the trades between Japan, China, and the Pacific coast of the United States. By Order...

  4. 78 FR 8032 - Misuse of Internet Protocol (IP) Captioned Telephone Service; Telecommunications Relay Services...

    Science.gov (United States)

    2013-02-05

    ... providers to ensure that equipment and software used in conjunction with their service have a default...] Misuse of Internet Protocol (IP) Captioned Telephone Service; Telecommunications Relay Services and Speech-to-Speech Services for Individuals With Hearing and Speech Disabilities AGENCY: Federal...

  5. Technical Service Agreement (TSA) | Frederick National Laboratory for Cancer Research

    Science.gov (United States)

    Frederick National Laboratory for Cancer Research (FNLCR) scientists provide services and solutions to collaborators through the Technical Services Program, whose portfolio includes more than 200 collaborations with more than 80 partners. The Frederi

  6. Activities of the Service for maintenance of the RA reactor electronic equipment in 1979 - Report - Annex IV; Prilog IV Rad sluzbe za odrzavanje elektronske opreme reaktora RA u 1979. godini - Izvestaj -

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1979-12-15

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system. [Serbo-Croat] U okviru organizacione seme OOUR nuklearni reaktor RA sluzba za odrzavanje instrumentacije postrojenja ima sledece zadatke: odrzavanje postojece elektronske opreme; ucesce u planiranju eksperimenata i priprema elektronske opreme; nabavka nove opreme, rezervnih delova i komponenti; rad na izradi elektronske opreme i uredjaja za sopstvene potrebe i izrada projekata u domenu reaktorske opreme i ucesce u ugradnji nove opreme. Osnovna instrumentacija postrojenja obuhvata: sistem za upravljanje i zastitu, sistem za tehnolosku kontrolu i sistem za dozimetrijsku kontrolu.

  7. 26 CFR 301.6331-4 - Restrictions on levy while installment agreements are pending or in effect.

    Science.gov (United States)

    2010-04-01

    ... agreements are pending or in effect. 301.6331-4 Section 301.6331-4 Internal Revenue INTERNAL REVENUE SERVICE... Property for Collection of Taxes § 301.6331-4 Restrictions on levy while installment agreements are pending... is pending with the Internal Revenue Service (IRS), for 30 days immediately following the rejection...

  8. The Present Situation and Trend of Wearable Equipment in Electric Field Application

    Directory of Open Access Journals (Sweden)

    Guangwei Shao

    2017-01-01

    Full Text Available With the innovation of mobile internet technology and intelligent terminal technology, the wearable equipment has been gradually applied in various industries. Through the typical application of wearable equipment, the characteristics of wearable equipment technology and application are summarized. Based on the analysis of power field business application and technology, combined with the demand of electric field management, the design situation of the wearable equipment in electric field service is designed, and the future development direction of electric field wear can be forecasted.

  9. Perancangan Tata Kelola Layanan Teknologi Informasi Menggunakan ITIL versi 3 Domain Service Transition Dan Service Operation Di Pemerintah Kota Bandung

    Directory of Open Access Journals (Sweden)

    Luki Aisha Kusuma Wardani

    2016-10-01

    Full Text Available Nowadays, Information Technology plays an important role in an organization, and not only as a support equipment. Bandung City Government, as a government agency, make IT into one of the visions that need to be achieved. To achieve good governance based on Minister Regulation Number 41 in 2007, IT Governance is needed to ensure that the investment of IT can add value and align with institution’s objective. Bandung City Government currently doesn’t have policies and procedure that regulate about IT Service Management. Therefore, this study was conducted with the aim to create a guidance for Office of Communications and Information Technology of Bandung (Diskominfo to optimize the service provided. This study also aims to make Service Management governance so that the management of IT service have certain quality and meet the needs of business customers, and improve the quality as the agreement with the customers. This study was conducted using ITIL v3 with Service Operation and Service Transition domain. ITIL is IT Service Management best practice to improve the efficiency of IT operational. ISO 15504 was conducted to asses Capability Level of ITIL Process. Capability Level of Service Transition is 24.5% and Capability Level of Service Operation is 23%. Because of the inadequacy of the primary data, the assessment was also carried out by mapping the objective of institution with the risks related to the lack of ITIL processes. The results of the design are the governance policies and procedures related to the ITIL processes needed by the institution.

  10. 21 CFR 864.3010 - Tissue processing equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Tissue processing equipment. 864.3010 Section 864.3010 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES HEMATOLOGY AND PATHOLOGY DEVICES Pathology Instrumentation and Accessories § 864.3010...

  11. Spare-parts and perpetuity of equipment in French PWR plants

    International Nuclear Information System (INIS)

    Briolat, R.

    1993-01-01

    Supply of plants with new or repaired parts in strict quality conditions aids maintaining safety in operation and energy availability. Taking into account their expected life-time, a process of perpetuity in partnership with suppliers is necessary to ensure operation for the medium and long term. At EDF, the method involves a classification of mechanical and electrical spare parts in two levels of quality, responding to safety and availability imperatives and current available industrial practices. A diagram is presented to define optimal strategy for each equipment component, which gives choice between spare part storage, longevity agreement with the supplier, or a technology transfer agreement. 1 tab

  12. 32 CFR 37.685 - May I allow for-profit firms to purchase real property and equipment with project funds?

    Science.gov (United States)

    2010-07-01

    ... property and equipment with project funds? 37.685 Section 37.685 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Award Terms Affecting Participants' Financial, Property, and Purchasing Systems Property § 37.685 May I...

  13. 78 FR 53455 - Notice of Agreements Filed

    Science.gov (United States)

    2013-08-29

    .... Parties: Zim Integrated Shipping Services, Ltd.; China Shipping Container Line Co., Ltd. and China Shipping Container Lines (Hong Kong) Co., Ltd. (acting as a single party). Filing Party: Mark E. Newcomb.... Synopsis: The agreement authorizes Hamburg Sud to charter space to Hapag-Lloyd in the trade between the U.S...

  14. 77 FR 13604 - Notice of Agreements Filed

    Science.gov (United States)

    2012-03-07

    ...: Maersk Line/New World Alliance Slot Exchange Agreement. Parties: A.P. Moller-Maersk A/S trading under the... exchange space on their respective services in the trade between the U.S. Atlantic Coast and ports in Panama, the United Kingdom, Germany, the Netherlands and Mediterranean ports in France, Italy and Spain...

  15. Ways to control quality of electric equipment in the coal industry

    Energy Technology Data Exchange (ETDEWEB)

    Shipilov, A.D.; Nabokov, E.P.

    1982-01-01

    A structure is proposed for organization in the coal industry of a permanent service for controlling quality of electrical engineering equipment. A form was developed for introduction of recommendations to improve quality. Methods are suggested for evaluating the quality level as applied to specific tasks of controlling quality of the electrical equipment used in mining.

  16. Equipment aging: an overview of status and research needs

    International Nuclear Information System (INIS)

    Carfagno, S.P.

    1982-01-01

    The problem of equipment aging in nuclear power generating stations is viewed from the standpoint of the qualification of safety-related equipment. A brief summary of developments related to equipment aging and qualification (in industry, the regulatory arena, and in the research area) is presented to focus on the current status of the problem. Several research topics are suggested for consideration as components of any general plan of research on plant aging. Among these is a topic concerned with an effort to establish the relative merit of different approaches to account for the functional degradation of equipment in terms of their cost and their contribution to assurance of public safety and a topic to investigate ways to improve the monitoring of functional degradation of equipment in service. Some factors to be considered in choosing among research topics and in establishing funding levels are mentioned

  17. Dispensing Equipment Testing with Mid-Level Ethanol/Gasoline Test Fluid: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Boyce, K.; Chapin, J. T.

    2010-11-01

    The National Renewable Energy Laboratory's (NREL) Nonpetroleum-Based Fuel Task addresses the hurdles to commercialization of biomass-derived fuels and fuel blends. One such hurdle is the unknown compatibility of new fuels with current infrastructure, such as the equipment used at service stations to dispense fuel into automobiles. The U.S. Department of Energy's (DOE) Vehicle Technology Program and the Biomass Program have engaged in a joint project to evaluate the potential for blending ethanol into gasoline at levels higher than nominal 10 volume percent. This project was established to help DOE and NREL better understand any potentially adverse impacts caused by a lack of knowledge about the compatibility of the dispensing equipment with ethanol blends higher than what the equipment was designed to dispense. This report provides data about the impact of introducing a gasoline with a higher volumetric ethanol content into service station dispensing equipment from a safety and a performance perspective.

  18. Benefits Of Vibration Analysis For Development Of Equipment In HLW Tanks - 12341

    International Nuclear Information System (INIS)

    Stefanko, D.; Herbert, J.

    2012-01-01

    Vibration analyses of equipment intended for use in the Savannah River Site (SRS) radioactive liquid waste storage tanks are performed during pre-deployment testing and has been demonstrated to be effective in reducing the life-cycle costs of the equipment. Benefits of using vibration analysis to identify rotating machinery problems prior to deployment in radioactive service will be presented in this paper. Problems encountered at SRS and actions to correct or lessen the severity of the problem are discussed. In short, multi-million dollar cost saving have been realized at SRS as a direct result of vibration analysis on existing equipment. Vibration analysis of equipment prior to installation can potentially reduce inservice failures, and increases reliability. High-level radioactive waste is currently stored in underground carbon steel waste tanks at the United States Department of Energy (DOE) Savannah River Site and at the Hanford Site, WA. Various types of rotating machinery (pumps and separations equipment) are used to manage and retrieve the tank contents. Installation, maintenance, and repair of these pumps and other equipment are expensive. In fact, costs to remove and replace a single pump can be as high as a half million dollars due to requirements for radioactive containment. Problems that lead to in-service maintenance and/or equipment replacement can quickly exceed the initial investment, increase radiological exposure, generate additional waste, and risk contamination of personnel and the work environment. Several different types of equipment are considered in this paper, but pumps provide an initial example for the use of vibration analysis. Long-shaft (45 foot long) and short-shaft (5-10 feet long) equipment arrangements are used for 25-350 horsepower slurry mixing and transfer pumps in the SRS HLW tanks. Each pump has a unique design, operating characteristics and associated costs, sometimes exceeding a million dollars. Vibration data are routinely

  19. BENEFITS OF VIBRATION ANALYSIS FOR DEVELOPMENT OF EQUIPMENT IN HLW TANKS - 12341

    Energy Technology Data Exchange (ETDEWEB)

    Stefanko, D.; Herbert, J.

    2012-01-10

    Vibration analyses of equipment intended for use in the Savannah River Site (SRS) radioactive liquid waste storage tanks are performed during pre-deployment testing and has been demonstrated to be effective in reducing the life-cycle costs of the equipment. Benefits of using vibration analysis to identify rotating machinery problems prior to deployment in radioactive service will be presented in this paper. Problems encountered at SRS and actions to correct or lessen the severity of the problem are discussed. In short, multi-million dollar cost saving have been realized at SRS as a direct result of vibration analysis on existing equipment. Vibration analysis of equipment prior to installation can potentially reduce inservice failures, and increases reliability. High-level radioactive waste is currently stored in underground carbon steel waste tanks at the United States Department of Energy (DOE) Savannah River Site and at the Hanford Site, WA. Various types of rotating machinery (pumps and separations equipment) are used to manage and retrieve the tank contents. Installation, maintenance, and repair of these pumps and other equipment are expensive. In fact, costs to remove and replace a single pump can be as high as a half million dollars due to requirements for radioactive containment. Problems that lead to in-service maintenance and/or equipment replacement can quickly exceed the initial investment, increase radiological exposure, generate additional waste, and risk contamination of personnel and the work environment. Several different types of equipment are considered in this paper, but pumps provide an initial example for the use of vibration analysis. Long-shaft (45 foot long) and short-shaft (5-10 feet long) equipment arrangements are used for 25-350 horsepower slurry mixing and transfer pumps in the SRS HLW tanks. Each pump has a unique design, operating characteristics and associated costs, sometimes exceeding a million dollars. Vibration data are routinely

  20. Initial acceptance test experience with FFTF plant equipment

    International Nuclear Information System (INIS)

    Brown, R.K.; Coleman, K.A.; Mahaffey, M.K.; McCargar, C.G.; Young, M.W.

    1978-09-01

    The purpose of this paper is to examine the initial acceptance test experience of certain pieces of auxiliary equipment of the Fast Flux Test Facility (FFTF). The scope focuses on the DHX blowers and drive train, inert gas blowers, H and V containment isolation valves, and the Surveillance and In-service Inspection (SISI) transporter and trolley. For each type of equipment, the discussion includes a summary of the design and system function, installation history, preoperational acceptance testing procedures and results, and unusual events and resolutions

  1. Maintenance of electronic equipment at the Saclay Nuclear Research Centre

    International Nuclear Information System (INIS)

    Chicheportiche, Armand; Raoult, Norbert.

    1975-06-01

    The Test-Repair Group of the Saclay Electronics Services ensures the maintenance of electronic equipment available to users of the Saclay site. The more and more frequent use of microelectronics in these instruments increases the electronic operator density and the working and data transmission sequences are becoming difficult to understand. This leads to complications in the adjustment, testing and repairs. Ways and means are studied to facilitate maintenance while reducing the immobilization time of the equipment and the repair costs. The Saclay Electronics Services have developed a method of systematic test sequence formulation and breakdown diagnosis based on the properties of binary analysis. This method is used by a supplier of the CEA which has built the corresponding test equipment. Owing to the test programmmes established for each component of an apparatus it is possible for example to locate a faulty element on a plan including more than 100 integrated circuits and to replace it in no more than 10 minutes [fr

  2. On-site equipment and materials against CBRNE terrorism

    International Nuclear Information System (INIS)

    Yamamoto, Soichiro; Tokita, Kenichi

    2016-01-01

    There is no almighty field service equipment that can handle by itself all CBRNE (Chemical, Biological, Radiological, Nuclear, Explosive) terrorism. Since there is merit and demerit for each of equipment, operation methods and linkage of material/equipment based on detection principle are indispensable. This paper explained the principle and operation method of detection equipment, operation using multiple material/equipment, and system construction to facilitate cooperation with related ministries and agencies. There are six examples as typical material/equipment and detection principle for handling CBRNE as shown below: (1) ion mobility spectrometer, (2) infrared spectroscopy, (3) Raman scattering spectroscopy, (4) gas chromatographic mass spectrometry, (5) fluorescent reactive dye classification method, and (6) antigen antibody reaction method. This paper shows a flowchart that can measure within the duration of a respirator while wearing Level A protective clothing (about 15 to 20 min) by the combination of detector/analyzer based on these methods. The authors developed an information system that allows prompt information exchange between the on-site administrative agencies, research institutes, and other related organizations via network, in the case when substances etc. could not be specified in the above flowchart. (A.O.)

  3. Management of radiodiagnostic equipment: Implementation of self-maintenance project of the conventional x-ray equipment of Hospital Universitario Clementino Fraga Filho - HUCFF-UFRJ

    International Nuclear Information System (INIS)

    Couto, N.F. do; Azevedo, A.C.P.; Koch, H.A.

    2001-01-01

    The project aims the implantation of a management program, for the maintenance of the conventional X-ray equipment at HUCFF. It has been implemented through the training of the electronic technicians who work at the Hospital. Essential courses were organized such as: Basics of Radioprotection, Radiographs Techniques, and Maintenance of equipment of X-Rays. Equipment: a library with the schemes of the equipment is being assembled in collaboration with UNICAMP. In order to manage the process, a software was created using the tools of the total quality for control of the maintenance. Preliminary tests: the equipment and their working conditions were evaluated, as well as the level of the employees' satisfaction with their use. The creation of a new routine for maintenance seeks to assist the demands of the new legislation in Brazil 5, and also reduce the costs to improve the quality of the images in the Radiodiagnostic Service. (author)

  4. A multipurpose radiation service center

    International Nuclear Information System (INIS)

    Hofmann, E.-G.

    1977-01-01

    In Germany, AEG-Telefunken has been working as a supplier of irradiation equipment for more than ten years. There is a close cooperation with Radiation Dynamics Inc., Westbury, N.Y. Radiation sources are available for most industrial applications. As a special service AEG is establishing a multipurpose radiation service center in Hamburg-Wedel, Germany. This center will be used by a host of companies to investigate the effects of radiation on a broad range of materials, to develop special processing equipment, to process customer supplied products and to perform R and D work and contracts. Initially this service center will be equipped with one research type High-Power X-ray Unit (200 kV/32 mA) and one industrial type Dynamitron accelerator (1500 kV/37.5 kW). (author)

  5. 24 CFR 3280.804 - Disconnecting means and branch-circuit protective equipment.

    Science.gov (United States)

    2010-04-01

    ...-2005, National Electrical Code, concerning identification of each disconnecting means and each service... multiple receptacle shall be acceptable when connected to a 20-ampere laundry circuit. (i) When circuit... the blank space. (k) When a home is provided with installed service equipment, a single disconnecting...

  6. 47 CFR 68.354 - Numbering and labeling requirements for terminal equipment.

    Science.gov (United States)

    2010-10-01

    ... no competitive advantage for any entity or segment of the industry. (e) FCC numbering and labeling...) COMMON CARRIER SERVICES (CONTINUED) CONNECTION OF TERMINAL EQUIPMENT TO THE TELEPHONE NETWORK Conditions.... Customs Service to carry out their functions, and for consumers to easily identify the responsible party...

  7. An Investigation into Specifying Service Level Agreements for Provisioning Cloud Computing Services

    Science.gov (United States)

    2012-12-01

    IT .................................................................................................... Information Technology KPI ...the service delivery be measured? 3. Key Performance Indicators ( KPIs ): Describe the KPIs and the responsible party for producing the KPIs . 4...level objectives (SLOs) that are evaluated according to measurable Key Performance Indicators ( KPIs ). Automatic SLA protection enables further

  8. [Planning by service organisation priorities. The process of preparing strategic service-organisation plans].

    Science.gov (United States)

    Sampietro-Colom, Laura; Costa, Dolors; Busqué, Anna; Lacasa, Carme

    2008-12-01

    Strategic planning designs the general setting and the strategic principles of a healthcare system, as well as the general guidelines that govern the development of a health system. Strategic service-organisation plans deal with translating healthcare policies into service policies and respond, principally, to the need for services; these give rise to problems that require a solution. They are developed in line with advances in scientific knowledge, the implementation and current characteristics of the healthcare services and the evolution in the competences of professional teams. There are five stages for their development: identification of health/service requirements; prioritisation of needs in health/services; definition of and agreement on service organisation models (care model and service portfolio); the preparation of and agreement on territorial action plans; introduction and evaluation. A conceptual framework is presented along with practical applications carried out in Catalonia.

  9. 78 FR 68444 - Notice of Agreements Filed

    Science.gov (United States)

    2013-11-14

    ...; Oceania Cruises; Paul Gauguin Cruises; Pearl Seas Cruises; Princess Cruises; Regent Seven Seas Cruises.... Agreement No.: 012232. Title: MSC/CMA CGM North West European Continent-US East Coast Service Space Charter... authorizes MSC to charter space to CMA CGM in the trade between the North West European Continent and the U.S...

  10. 75 FR 19402 - Notice of Agreements Filed

    Science.gov (United States)

    2010-04-14

    ... cargo from ports on the U.S. east coast to ports in Chile, Ecuador, Peru, Panama, Colombia, and... Joint Service Agreement and Mitsui O.S.K. Lines, Ltd. Filing Party: Robert B. Yoshitomi, Esq., Nixon... Co. Pte. Ltd.; Hyundai Merchant Marine; and Mitsui O.S.K. Lines, Ltd. Filing Party: Robert Yoshitomi...

  11. ITER plant layout and site services

    International Nuclear Information System (INIS)

    Chuyanov, V.A.

    2000-01-01

    The ITER site has not yet been determined. Nevertheless, to develop a construction plan and a cost estimate, it is necessary to have a detailed layout of the buildings, structures and outdoor equipment integrated with the balance of plant service systems prototypical of large fusion power plants. These services include electrical power for magnet feeds and plasma heating systems, cryogenic and conventional cooling systems, compressed air, gas supplies, demineralized water, steam and drainage. Nuclear grade facilities are provided to handle tritium fuel and activated waste, as well as to prevent radiation exposure of workers and the public. To prevent interference between services of different types and for efficient arrangement of buildings, structures and equipment within the site area, a plan was developed which segregated different classes of services to four quadrants surrounding the tokamak building, placed at the approximate geographical centre of the site. The locations of the buildings on the generic site were selected to meet all design requirements at minimum total project cost. A similar approach was used to determine the locations of services above, at and below grade. The generic site plan can be adapted to the site selected for ITER without significant changes to the buildings or equipment. Some rearrangements may be required by site topography, resulting primarily in changes to the length of services that link the buildings and equipment. (author)

  12. IEEE standard for design qualification of safety systems equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This standard is written to serve as a general standard for qualification of all types of safety systems equipment, mechanical and instrumentation as well as electrical. It also establishes principles and procedures to be followed in preparing specific safety systems equipment standards. Guidance for qualifying specific safety systems equipment may be found in various specific equipment qualification standards that are now available or are being prepared. It is required that safety systems equipment in nuclear power generating stations meet or exceed its performance requirements throughout its installed life. This is accomplished by a disciplined program of design qualification and quality assurance of design, production, installation, maintenance and surveillance. This standard is for the design qualification section of the program only. Design qualification is intended to demonstrate the capability of the equipment design to perform its safety function(s) over the expected range of normal, abnormal, design basis event, post design basis event, and in-service test conditions. Inherent to design qualification is the requirement for demonstration, within limitations afforded by established technical state-of-the-art, that in-service aging throughout the qualified life established for the equipment will not degrade safety systems equipment from its original design condition to the point where it cannot perform its required safety function(s), upon demand. The above requirement reflects the primary role of design qualification to provide reasonable assurance that design- and age-related common failure modes will not occur during performance of safety function(s) under postulated service conditions

  13. 7 CFR Exhibit A to Subpart I of... - Self-Help Technical Assistance Grant Agreement

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE... rights under 7 CFR part 1900, subpart B. (f) An extension of this grant agreement may be approved by FmHA... value from suppliers, contractors, or others doing business with the grantee. To the extent permissible...

  14. Deriving business processes with service level agreements from early requirements

    NARCIS (Netherlands)

    Frankova, Ganna; Seguran, Magali; Gilcher, Florian; Trabelsi, Slim; Doerflinger, Joerg; Aiello, Marco

    When designing a service-based business process employing loosely coupled services, one is not only interested in guaranteeing a certain flow of work, but also in how the work will be performed. This involves the consideration of non-functional properties which go from execution time and costs, to

  15. Seismic qualification method of equipment for nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J.S.; Choi, T.H.; Sulaimana, R.A.

    1995-01-01

    Safety related equipment installed in Korean Nuclear Power Plants are required to perform a safety function during and after a seismic event. To accomplish this safety function, they must be seismically qualified in accordance with the intent and requirements of the USNRC Reg. Guide 1.100 Rev. 02 and IEEE Std. 344-1987. This paper defines and summarizes acceptable criteria and procedures, based on the Korean experience, for seismic qualification of purchased equipment to be installed in a nuclear power plant. As such the paper is intended to be a concise reference by equipment designers, architectural engineering company and plant owners in uniform implementation of commitments to nuclear regulatory agencies such as the USNRC or Korea Institute of Nuclear Safety (KINS) relating to adequacy of seismic Category 1 equipment. Thus, the paper provides the methodologies which can be used for qualifying equipment for safely related service in Nuclear Power Plants in a cost effective manner

  16. Energy saving potential of energy services - experimentation on the life cycle of energy conversion equipment; Potentiel d'economies d'energie par les services energetiques - application au cycle de vie des equipements de conversion de l'energie

    Energy Technology Data Exchange (ETDEWEB)

    Dupont, M

    2006-12-15

    Energy efficiency services are growing in Europe but their role is still limited. In order to evaluate the potential, we focused first of all on policy, economical and environmental mechanisms that support their development. European natural gas and electricity markets, that are now almost wholly de-regulated, are analysed and compared to their historical structure. By introducing uncertainty on energy prices, this new deal translates better the real energy costs. Energy performance contracts (EPC) limit the impact of these uncertainties on the customer energy bills by guaranteeing a financial result. As a result of the modelling of these contracts, namely operation and maintenance ones, we prove that they transfer technical and financial risks from building owners to energy service companies (ESCO) making energy saving measures easier and less expensive at the same time. These contracts are relatively widespread for heating or compressed-air processes but remain marginal for air-conditioning systems. So new methods were needed to guarantee on the long terms the efficiency of air-conditioning systems demand (1) to master the process and its performances and (2) to be able to determine precisely the energy saving potential and its realisation costs. A detailed energy audit is thus necessary for which we propose a guidance. Conclusions of audits carried out prove that energy saving potential is mainly located in equipment management and control. These optimizations are not always carried out because of a lack of contractual incentive and due to the weaknesses of audit methods. Through the involvement of an independent expert, the mandatory and regular inspection of air-conditioning systems may allow to verify and guide such practices. A three-step analysis procedure has been developed in order to maximize the inspection potential and to get higher benefits from service contracts. (author)

  17. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  18. Adoption of Lean Thinking and Service Improvement for Care Home Service

    OpenAIRE

    Chuang-Chun Chiou

    2014-01-01

    Ageing population is a global trend; therefore the need of care service has been increasing dramatically. There are three basic forms of service delivered to the elderly: institution, community, and home. Particularly, the institutional service can be seen as an extension of medical service. The nursing home or so-called care home which is equipped with professional staff and facilities can provide a variety of service including rehabilitation service, short-term care, and long term care. Sim...

  19. Making Education Markets through Global Trade Agreements

    Science.gov (United States)

    Robertson, Susan L.

    2017-01-01

    This paper uses the global trade negotiations and agreements, which include education sectors as potentially tradable services, to show the complex processes at work in making global education markets. Drawing on the work of Jens Beckert and others, I focus on the micro-processes of making capitalist orders and the challenges at hand in bringing…

  20. The design and equipments of hospital pharmacies in Isfahan, Iran

    Directory of Open Access Journals (Sweden)

    Ali Mohammad Sabzghabaee

    2010-01-01

    Full Text Available Background: Nowadays pharmaceutical care departments located in hospitals are amongst the important pillars of the healthcare system. The aim of this study was to evaluate designing features and equipments of hospital drugstores affiliated with Isfahan University of Medical Sciences. Methods: In this cross-sectional study a self-defined and validated questionnaire was used which included all the necessary and standard needed spaces and equipments of an ideal hospital pharmacy. The questionnaire was filled in by one of the researchers in all twelve hospital drugstores located in the teaching and non-teaching hospitals affiliated with Isfahan University of Medical Sciences. Data analysis was done using SPSS (version 14. Results: Results showed that 56% of drugstore space allocations were unsuitable. Used pharmaceutical equipments in 75% of surveyed hospitals were not according to the standards. Almost all of these pharmacies had rather an enough space for storage, but cold storages were not designed in 58% of them. In 66% of perused hospitals, pharmaceutical services disposal level was admissible. The structural engineering parameters like size and dimensions, available spaces, availability of structural planes, existence of air conditioning systems and brightness controllers, adequate stores for drugs and safe places for narcotics were observed in 55% of pharmacies. Conclusions: There are apparent out of standard space allocations and shortages of needed equipments for offering drug services in studied drugstores that may probably lead to a waste of time and money. These issues may reduce the efficiency and safety of pharmaceutical services and drug administration in hospitals.

  1. Measuring the performance of maintenance service outsourcing.

    Science.gov (United States)

    Cruz, Antonio Miguel; Rincon, Adriana Maria Rios; Haugan, Gregory L

    2013-01-01

    The aims of this paper are (1) to identify the characteristics of maintenance service providers that directly impact maintenance service quality, using 18 independent covariables; (2) to quantify the change in risk these covariables present to service quality, measured in terms of equipment turnaround time (TAT). A survey was applied to every maintenance service provider (n = 19) for characterization purposes. The equipment inventory was characterized, and the TAT variable recorded and monitored for every work order of each service provider (N = 1,025). Finally, the research team conducted a statistical analysis to accomplish the research objectives. The results of this study offer strong empirical evidence that the most influential variables affecting the quality of maintenance service performance are the following: type of maintenance, availability of spare parts in the country, user training, technological complexity of the equipment, distance between the company and the hospital, and the number of maintenance visits performed by the company. The strength of the results obtained by the Cox model built are supported by the measure of the Rp,e(2) = 0.57 with a value of Rp,e= 0.75. Thus, the model explained 57% of the variation in equipment TAT, with moderate high positive correlation between the dependent variable (TAT) and independent variables.

  2. 42 CFR 1007.9 - Relationship to, and agreement with, the Medicaid agency.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Relationship to, and agreement with, the Medicaid... AND HUMAN SERVICES OIG AUTHORITIES STATE MEDICAID FRAUD CONTROL UNITS § 1007.9 Relationship to, and agreement with, the Medicaid agency. (a) The unit must be separate and distinct from the Medicaid agency. (b...

  3. 7 CFR 246.6 - Agreements with local agencies.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Agreements with local agencies. 246.6 Section 246.6 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SPECIAL SUPPLEMENTAL NUTRITION PROGRAM FOR WOMEN, INFANTS AND CHILDREN...

  4. 7 CFR 1150.134 - Nominee's agreement to serve.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... agreement to: (a) Serve on the Board if appointed; (b) Disclose any relationship with any organization that operates a qualified State or regional program or has a contractual relationship with the Board; and (c...

  5. 42 CFR 137.336 - What is the difference between fixed-price and cost-reimbursement agreements?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What is the difference between fixed-price and cost-reimbursement agreements? 137.336 Section 137.336 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND...-reimbursement agreements? (a) Cost-reimbursement agreements generally have one or more of the following...

  6. Quality control of repair of equipment for coal preparation plants. Upravlenie kachestvom remonta oborudovaniya ugleobogatitel'nykh fabrik

    Energy Technology Data Exchange (ETDEWEB)

    Okonishnikov, A I; Neskoromnykh, V M; Surzhenko, V S; Sirichenko, R P; Pavlyuchenko, S G; Lesikov, A V

    1984-01-01

    The Ukrniiugleobogashchenie, Kalininsk and Sukhodol'sk coal preparation plants have developed the SUKRO system for control of repair quality of coal preparation equipment in the USSR. The system is based on a system of standards used in coal preparation plants. The following systems of standards used by the SUKRO system are analyzed: organization standards (order of repair in a coal preparation plant, repair planning, spare part systems, methods for determining equipment wear, analysis of equipment failures), standards for maintenance and repair (methods for equipment maintenance, service life of each equipment component or system, structure of preventive repair or repair, organizational models of repair operations, lubrication systems), standards for assessment of labor quality during repair operations. Use of the SUKRO system in the Sukhodol'sk coal preparation plant is evaluated. The SUKRO forms a system of standards for repair and maintenance of equipment considering operation conditions in coal preparation plants, requirements for equipment reliability and service life. (4 refs.)

  7. Rules on the Inspection of Gamma Radiography Equipment

    International Nuclear Information System (INIS)

    1981-01-01

    These Rules issued by the State Institute of Radiation Hygiene (SIS) set out the obligations of licences and vendors of gamma radiography equipment for purposes of quality control. The Rules provide for a programme of periodic inspections and services by personnel approved by SIS. (NEA)

  8. Ex-ante Study of a Possible Modernisation of the EU-Chile Association Agreement

    NARCIS (Netherlands)

    Henry de Frahan, Bruno; Hartwell, Christopher; Kuik, O.J.; Lirette, Paul; Mirecka, Katarzyna; Nolan Garcia, Kimberly; Pellandra, Andrea; Polanco, Rodrigo; Schmidt-Hebbel, Klaus; Shuvaieva, Iryna; Sidlo, Kataryna; Teresinski, Jan; Torrent, Ramon; Valdes, Albert

    This study provides an ex-ante impact assessment of the possible modernisation of the EU-Chile Association Agreement. Since the current agreement entered into force in 2003, Chilean exports of agricultural/food products and services to the EU have nearly tripled while EU exports to Chile have

  9. 42 CFR 431.620 - Agreement with State mental health authority or mental institutions.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Agreement with State mental health authority or mental institutions. 431.620 Section 431.620 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... GENERAL ADMINISTRATION Relations With Other Agencies § 431.620 Agreement with State mental health...

  10. The Danish agreements on energy efficiency

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    CO{sub 2}-taxes for industry were introduced in 1993. In 1996, the taxes were increased and an agreement system for energy-intensive companies was implemented. The main purpose of the agreement system has been to allow energy-intensive industry to pay a reduced tax rate, while at the same time improving energy efficiency. The evaluation of the energy tax system has shown that it has been possible to establish an energy tax that has led to a decrease in CO{sub 2}-emissions, without causing a decrease in the competitiveness of trade, industry and services. The agreement system has been a very important element in that it has improved energy efficiency in companies in which taxes would not have been a realistic instrument. In the case of companies with agreements, several studies suggest improvements of approximately 2.7% of the total energy use per agreement (three years). The three sources (concrete projects, special investigation and energy management) contribute approximately one third of this reduction each. The values for special investigation and energy management must be used with great care. It is also predicted that a continuation of the agreement system by 2005, relative to a situation without agreements, can lead to a decrease in CO{sub 2}-emissions corresponding to 6% of total emissions in industry and trade. Of this reduction, the highest amount is due to energy management. However, maintaining the positive effects of energy management systems will require that companies give higher priority to the managerial part of the system and not only focus on energy accounting. Some companies have argued that it is costly to carry out energy audits and to have to audits verified. Therefore, consideration should be given to possibilities for reducing the administrative costs of entering into an agreement, without this causing reduced efforts to save energy. A means of achieving these objectives could be to reduce the requirement for energy audits and verification

  11. 48 CFR 42.1202 - Responsibility for executing agreements.

    Science.gov (United States)

    2010-10-01

    ... REGULATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Novation and Change-of-Name... processing and executing novation and change-of-name agreements shall be determined as follows: (a) If any of... ACO responsible for the corporate office, if affected contracts are in more than one plant or division...

  12. E-Services and the Codification of Informational Services

    DEFF Research Database (Denmark)

    Scupola, Ada; Henten, Anders; Nicolajsen, Hanne Westh

    2011-01-01

    The concept of e-services has gained increasing use during the past decade. There is, however, no general agreement as to the precise meaning and scope of the term. The research purpose of the present chapter is, therefore, to discuss the e-service concept, its strengths and scope, and thereby co...

  13. Approach to the assessment of the performance of nondestructive test methods in the manufacture of nuclear power station equipment

    International Nuclear Information System (INIS)

    Michaut, J.P.

    1996-01-01

    The safety of a nuclear power station lies largely in the possibility of ensuring, at the time of in service inspections on major equipment, that the extent of faults which may appear or develop is not greater than that of faults detrimental to behavior in service. This assurance is based on performance demonstration of the nondestructive test methods used for inspecting the equipment in service. This is the subject of numerous studies in various countries. To ensure that manufacturing faults likely to downgrade the safety of the equipment are not discovered in service, it seems desirable to make sure that the performance of the nondestructive test (NDT) methods which are going to be used in manufacture will be at least as high as those used in service and that they are therefore capable of guaranteeing detection of faults clearly less important than really harmful faults. The performance of NDT methods and their consistency with those which can be used in service is evaluated before the start of manufacture on a mock-up representative of the equipment itself. Information is given on research in progress on the bimetal welding of a pressurizer spray nozzle

  14. 76 FR 71617 - Request for Comments Concerning Compliance With Telecommunications Trade Agreements

    Science.gov (United States)

    2011-11-18

    ... Government Procurement. (2) Whether Canada or Mexico has failed to comply with its telecommunications... the United States: The World Trade Organization (``WTO'') General Agreement on Trade in Services; The... telecommunications products and services. For the current review, the USTR seeks comments on: (1) Whether any WTO...

  15. Electric Ground Support Equipment at Airports

    Energy Technology Data Exchange (ETDEWEB)

    2017-12-12

    Airport ground support equipment (GSE) is used to service airplanes between flights. Services include refueling, towing airplanes or luggage/freight carts, loading luggage/freight, transporting passengers, loading potable water, removing sewage, loading food, de-icing airplanes, and fire-fighting. Deploying new GSE technologies is a promising opportunity in part because the purchasers are generally large, technologically sophisticated airlines, contractors, or airports with centralized procurement and maintenance departments. Airlines could particularly benefit from fuel diversification since they are highly exposed to petroleum price volatility. GSE can be particularly well-suited for electrification because it benefits from low-end torque and has frequent idle time and short required ranges.

  16. Agreement between the Government of the Kingdom of Belgium and the Government of the Arab Republic of Egypt concerning co-operation in the peaceful uses of nuclear energy

    International Nuclear Information System (INIS)

    1985-01-01

    The Agreement covers among others planning, construction and operation of nuclear power plants in Egypt, as well as other nuclear facilities and research establishments; safety of nuclear facilities and radiation protection; exploration and exploitation of uranium resources; scientific and technological research and development, etc. The parties have undertaken that no material, equipment or information transferred under the Agreement will be used in such a way as to result in a nuclear explosive device, and that such material and equipment will be subject to safeguards as specified in an agreement with the IAEA in accordance with the Non-Proliferation Treaty. The Agreement entered into force on 1st August 1985 for a period of thirty years and may subsequently be extended for five-year periods. (NEA) [fr

  17. CFE-DOE agreement for the study of Mexican geothermal fields

    International Nuclear Information System (INIS)

    Le Bert, G.

    1990-01-01

    The Commission Federal de Electricidad (CFE) is the public utility in Mexico in charge of electric energy service, as well as harnessing geothermal resources. An agreement of mutual benefit to achieve a thorough understanding of the nature of geothermal reservoirs was signed on April 17, 1986 with the United State Department of Energy (DOE). The major objective of this agreement was to investigate how geothermal resources can best be explored and exploited. The duration of the agreement was for 3 years, but as happens in many long-term research programs, new topics and problems appear. Thus an extension of 5 years was foreseen. A brief discussion on the results of the main tasks is presented in this paper, as well as of the new tasks and scopes for the 5-year extension of the agreement

  18. Seismic contracts and agreements

    International Nuclear Information System (INIS)

    Cooper, N.M.; Krause, V.

    1999-01-01

    Some points to consider regarding management of seismic projects within the Canadian petroleum industry were reviewed. Seismic projects involve the integration of many services. This paper focused on user-provider relationships, the project planning process, competitive bid considerations, the types of agreement used for seismic and their implications, and the impact that certain points of control may have on a company: (1) initial estimate versus actual cost, (2) liability, (3) safety and operational performance, and (4) quality of deliverables. The objective is to drive home the point that in today's environment where companies are forming, merging, or collapsing on a weekly basis , chain of command and accountability are issues that can no longer be dealt with casually. Companies must form business relationships with service providers with a full knowledge of benefits and liabilities of the style of relationship they choose. Diligent and proactive management tends to optimize cost, safety and liability issues, all of which have a bearing on the points of control available to the company

  19. Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, B. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Musolino, S. V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Klemic, G. [US Dept. of Homeland Security National Security Technology Lab., New York, NY (United States)

    2017-06-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence management missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.

  20. Planning the School Food Service Facilities. Revised 1967.

    Science.gov (United States)

    Utah State Board of Education, Salt Lake City.

    Evaluations of food service equipment, kitchen design and food service facilities are comprehensively reviewed for those concerned with the planning and equipping of new school lunchrooms or the remodeling of existing facilities. Information is presented in the form of general guides adaptable to specific local situations and needs, and is…

  1. 46 CFR 27.305 - What are the requirements for fire-extinguishing equipment on towing vessels in ocean or coastal...

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false What are the requirements for fire-extinguishing equipment on towing vessels in ocean or coastal service whose construction was contracted for on or after... for fire-extinguishing equipment on towing vessels in ocean or coastal service whose construction was...

  2. TBG's equipment for gas pipeline repair and bypass in service; Equipamentos da TBG para execucao de reparos e bypass em operacao no Gasoduto Bolivia-Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Lemgruber, Nelson Arthur Pinto; Vasconcellos, Carlos Renato Aragonez de; Frota, Cristiane Souto [Transportadora Brasileira Gasoduto Bolivia-Brasil, S.A., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    The Bolivia-Brazil Natural Gas Pipeline - GASBOL - begins in the city of Santa Cruz of La Sierra, in Bolivia, arriving in Canoas (RS), in Brazil, traveling an extension of 3.150 km. TBG is the owner and operator from 2.593 km in Brazilian soil, with maximum nominal diameter 32 inches, capacity of transportations until 30 million cubic meter a day, and MAOP 100 bar. This work presents the main available resources in TBG for repair of the gas pipeline, as clamps for small repairs, bolt-on clamps, equipment for hot tapping and execution of by pass in-service, cold cutter machine, air movers for removal the gas of the line, and movable systems of emergency illumination. The location of the equipment is detailed, the main technical and operational characteristics, as well as aspects observed in simulated accomplished in the operational units of TBG and presents the planning for acquisition of new equipment. (author)

  3. Practices of prolongation of the I and C equipment lifetime

    International Nuclear Information System (INIS)

    Samoylov, O.B.; Pronin, V.S.; Savelov, I.D.; Bogomazov, V.A.; Drumov, V.V.; Chudin, A.G.

    2000-01-01

    The lifetime of nuclear power plants (NPP) always exceeds the operational time of Instrumentation and Control (I and C) systems. Ageing of I and C equipment in NPPs have many aspects. Research of these aspects is being performed in OKB Mechanical Engineering. Under condition of fast development of I and C systems and applying more stringent safety requirements, modernization of the equipment irrespective of its operational condition is getting important. However, an equipment of I and C systems operated in Russia was designed and manufactured applying highest requirements for a reliability of their work during its whole operational time. Therefore, in many cases it is not necessary to replace them in spite of expiration of their specified lifetime. During operation this equipment is maintained in a proper operation condition by a special service procedures stipulated by its development. When the equipment lifetime approaches to its end, lifetime extension for the certain period should be considered. (author)

  4. [Efficacy of agreements within the Enchede Stroke Service to refer patients with a stroke from the stroke unit in the hospital to a nursing home for short-term rehabilitation

    NARCIS (Netherlands)

    Nijmeijer, N.M.; Stegge, B.M. aan de; Zuidema, S.U.; Sips, H.J.W.; Brouwers, P.J.

    2005-01-01

    OBJECTIVE: To assess the efficacy of agreements within the Enschede Stroke Service to refer patients with a stroke from the stroke unit in the hospital to a nursing home for short-term rehabilitation. DESIGN: Prospective, partly retrospective. METHOD: All patients who were referred from the stroke

  5. The optimal design of service level agreement in IAAS based on BDIM

    Science.gov (United States)

    Liu, Xiaochen; Zhan, Zhiqiang

    2013-03-01

    Cloud Computing has become more and more prevalent over the past few years, and we have seen the importance of Infrastructure-as-a-service (IaaS). This kind of service enables scaling of bandwidth, memory, computing power and storage. But the SLA in IaaS also faces complexity and variety. Users also consider the business of the service. To meet the most users requirements, a methodology for designing optimal SLA in IaaS from the business perspectives is proposed. This method is different from the conventional SLA design method, It not only focuses on service provider perspective, also from the customer to carry on the design. This methodology better captures the linkage between service provider and service client by considering minimizing the business loss originated from performance degradation and IT infrastructure failures and maximizing profits for service provider and clients. An optimal design in an IaaS model is provided and an example are analyzed to show this approach obtain higher profit.

  6. Servicing NPPs in Japan, Korea and Taiwan

    International Nuclear Information System (INIS)

    Bohmann, W.; Poetz, F.

    1991-01-01

    More than 45 comparable orders (for equipment or services ) have been carried out in Japan, Korea and Taiwan by ABB Reaktor since 1982. Recently contracts to deliver inspection and repair equipment for the core baffle former bolts of Japanese NPPs, and in 1990, a contract to clean two steam generators in Korea, together with Pacific Nuclear Services, USA, were won. 2 figs

  7. Putting agricultural equipment and digital technologies at the cutting edge of agroecology

    Directory of Open Access Journals (Sweden)

    Bellon Maurel Véronique

    2017-05-01

    Full Text Available The agro-ecological transition is an ambitious challenge. It can be met by implementing the fundamentals of agroecology (use of biodiversity, integration of agriculture in landscapes, closure of flow loops in the context of a broad and renewed offer of technologies: agro-equipment, biotechnology, digital technologies… This article explores the role that agro-equipment and digital services can play in this transition. These technologies contribute through various levers to the agro-ecological transition: by improving farming efficiency (more service rendered for the same environmental impact, by precision farming (adaptation of the operations to the needs of the plant or the animal based on a monitoring–diagnosis–recommendation cycle and by the development of specialized machinery helping the farmer to achieve “flow loop-closing” (at the plot level, by maintaining the soil quality, or at the farm level, with the recycling of organic effluents or to take advantage of biodiversity (e.g., with agro-equipment adapted to mixed crops. The technological bricks that are requested and for which advances are expected are: sensors (to measure plant or animal needs and associated digital technologies (information transfer, data processing, precision technologies for input application, robotics, specialized machines to manage soil cover and weeds, or for agroforestry. The brakes and engines for innovation in agro-equipment are studied. The brakes are the generally small structure of the farm manufacturing companies, the deficit of the demand from farmers and the complexity − either real or perceived − of these equipments. To encourage innovation, several levers are to be used: involving users in the design of agro-equipments, creating financial incentives for innovative equipment purchase, and training end-users, prescribers and dealers to the high potential of these new technologies. In conclusion, putting agro-equipment and digital technology

  8. Exploring rater agreement: configurations of agreement and disagreement

    Directory of Open Access Journals (Sweden)

    ALEXANDER VON EYE

    2006-03-01

    Full Text Available At the level of manifest categorical variables, a large number of coefficients and models for the examination of rater agreement has been proposed and used for descriptive and explanatory purposes. This article focuses on exploring rater agreement. Configural Frequency Analysis (CFA is proposed as a method of exploration of cross-classifications of raters’ judgements. CFA allows researchers to (1 examine individual cells and sets of cells in agreement tables; (2 examine cells that indicate disagreement; and (3 explore agreement and disagreement among three or more raters. Four CFA base models are discussed. The first is the model of rater agreement that is also used for Cohen’s (1960  (kappa. This model proposes independence of raters’ judgements. Deviations from this model suggest agreement or disagreement beyond chance. The second CFA model is based on a log-linear null model. This model is also used for Brennan and Prediger’s (1981 n. It proposes a uniform distribution of ratings. The third model is that of Tanner and Young (1985. This model proposes equal weights for agreement cases and independence otherwise. The fourth model is the quasi-independence model. This model allows one to blank out agreement cells and thus to focus solely on patterns of disagreement. Examples use data from applicant selection.

  9. Energy and the NAFTA [North American Free Trade Agreement

    International Nuclear Information System (INIS)

    Plourde, A.

    1993-01-01

    A review is presented of the implications of the North American Free Trade Agreement (NAFTA) for the energy industry. This agreement expands the coverage accorded to energy in the Canada-US Free Trade Agreement (FTA), and is of limited significance with respect to Canada-US relations, but is quite important to these two countries' energy trade with Mexico. With respect to Canada-US trade, the most important departure from the FTA is that NAFTA tends to ensure a greater degree of respect for the terms of negotiated contracts, in particular by requiring the parties to make efforts to secure compliance with the national treatment provisions of the NAFTA by subfederal regulatory entities. Mexico's constitution severely restricts foreign participation in the activities of its energy industries, including basic petrochemicals. While NAFTA accomodates these restrictions, Canadian and US companies will have opportunities to bid on contracts for goods and services and construction in the Mexican energy sector on an equal footing with their Mexican counterparts. NAFTA also provides expanded opportunities for foreign investment and control in electricity generation for own-use, cogeneration and public service purposes. The parties are explicitly allowed to extend activity incentives to their respective oil and gas industries. 9 refs

  10. 42 CFR 493.1252 - Standard: Test systems, equipment, instruments, reagents, materials, and supplies.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Standard: Test systems, equipment, instruments... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STANDARDS AND CERTIFICATION LABORATORY... storage of reagents and specimens, accurate and reliable test system operation, and test result reporting...

  11. Radiometer evaluation of X-rays equipment in the region of Aracatuba, Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Fernandes, Marco A.R.

    2009-01-01

    This paper presents the basic concepts of radiation protection to guide the health care professionals who use equipment emitting ionizing radiation on the correct handling of the beams of radiation. Radiometric evaluations were conducted in 1665 in X-ray equipment, installed in dental surgeries and clinics, hospitals and radiology services, during the years 1996 to 2003 in the region of Aracatuba. Tests of radiometry are presented as a technical report where the parameters are quantified physical and radiological verifying its compliance with the established by legislation. The distribution of reports by type of unit shows that the vast majority of equipment is of periapical dental x-rays (72%), 25% of equipment is medical equipment for radiology and 3% is dental equipment panoramic model (orthodontic documentation). Among the physical parameters analyzed, the length of the browser was showing more variance compared to the required by law, this fact may also contribute to gaps in the rate of the radiation dose and the size of field in the skin of the patient, the that can easily be resolved simply to replace the piece at the outlet of the head. During the completion of visits to services, it also noted a gap in the training of professionals who operate this equipment emitting radiation, warning of the need for specific training in the area. (author)

  12. Enhancing reactor availability factor by diagnostic monitoring and data acquisition of electrical equipments

    International Nuclear Information System (INIS)

    Singh, G.

    2006-01-01

    Electrical energy has made significant contribution to rapid growth of industrial activity in the country. Development and improvement of energy conversion devices or electrical apparatus have supported the growth. Reliability is probably the most important factor in electrical supply system, not only to give uninterrupted service but to provide an economic supply. Regular diagnostic testing of electrical equipments will make a significant contribution to the reliability of electrical supply. The purpose of diagnostic monitoring is to recognize the development of faults at an early stage, which consequently allows greater freedom to schedule the outages resulting in lower downtime and lower capitalized losses. The insulation constitutes the heart of any electrical/power equipment. The insulation in power equipment in normal condition undergoes certain changes in the physical, chemical, electrical and mechanical properties. The change with respect to time in the presence of an influencing factor, more often a stress (electrical) is referred to as ageing. The deterioration of insulating material plays an important role in the assessing the condition of electrical equipments. The systematic diagnostic tests are also part of the maintenance program to ensure the continued serviceability of electrical equipments, by replacing or repairing the components likely to fail, as revealed by the test. Diagnostic tests are carried out on various electrical equipments for detection of incipient fault, location and judging their severity. (author)

  13. 38 CFR 61.61 - Agreement and funding actions.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) VA HOMELESS PROVIDERS GRANT AND PER DIEM PROGRAM § 61.61 Agreement and funding actions. (a) When an applicant for a capital grant, per diem, a special needs grant, or a technical assistance grant... under § 61.67 of this part where a capital grant recipient fails to provide supportive services and/or...

  14. Multilateral aspects of advanced regulatory cooperation: considerations for a Canada-EU Comprehensive Trade Agreement (CETA)

    NARCIS (Netherlands)

    Mathis, J.

    2012-01-01

    This article considers equivalency recognition for goods and for services in the context of the applicable WTO agreements and provisions. The discussion of equivalency arises from certain elements presented by the Canada-EU Comprehensive Trade Agreement (CETA), in which economically developed

  15. Bilateral agreements

    International Nuclear Information System (INIS)

    1998-01-01

    Ten bilateral agreements are presented. These are: 1) Co-operation agreement relating to the peaceful uses of nuclear energy between Argentina and EURATOM (1996); 2) Agreement on co-operation in the peaceful uses of nuclear energy between Argentina and Greece (1997); 3) Implementing arrangement for technical exchange and co-operation in the area of peaceful uses of nuclear energy between Argentina and the United States (1997); 4) Agreement concerning co-operation in nuclear science and technology between Australia and Indonesia (1997); 5) Implementation of the 1985 Agreement for co-operation concerning the peaceful uses of nuclear energy between the People's Republic of China and the United States (1998); 6) Protocol of co-operation between France and Lithuania (1997); 7) Agreement on co-operation in energy research, science and technology, and development between Germany and the United States (1998); 8) Agreement on early notification of a nuclear accident and exchange of information on nuclear facilities between Greece and Romania (1997); 9) Agreement on early notification of nuclear accidents and co-operation in the field of nuclear safety between Hungary and the Ukraine (1997); 10) Agreement in the field of radioactive waste management between Switzerland and the United States (1997). (K.A.)

  16. Management of spare parts in the obsolescence of equipment. Experiences of TECNATOM

    Energy Technology Data Exchange (ETDEWEB)

    Martin Frances, Antonio [Spares Engineering, TECNATOM, Ave. Montes de Oca 1, 28709, Madrid (Spain)

    2010-07-01

    Since 1957, Tecnatom is giving engineering specialized services to the Electric Power Generation Plants. These activities also extend to other industrial areas like aerospace sector. TECNATOM it's made up of highly qualified specialists with an extensive experience and dedicated spirit and a pool of young people who interact with them to ensure the continuity of the company as a great team. As an important part of our activities, the 'Spares Engineering', complements the reliability and guarantee of a committed company. Nowadays, because of different reasons, there is a growing problematic in the collection of safety equipment and its spares in the NPPs. Tecnatom has set several actions in motion directed to improve the availability of these equipment and spares, by means of life extension of equipment installed, by means of the development of equipment and spares alternatives to the originals, or by means of services in relation with the spare parts. The actions developed until now have provided satisfactory results in technical and economical terms for the Plants. We have developments at present in course, that we hope they will increase this contribution to solve the problems of obsolescence in NPP's. (authors)

  17. Design considerations, tooling, and equipment for remote in-service inspection of radioactive piping and pressure-vessel systems

    International Nuclear Information System (INIS)

    Swannack, D.L.; Schmoker, D.S.

    1983-01-01

    This paper summarizes results obtained in use of remotely-operated nondestructive testing (NDT) equipment for inspection of reactor-system components. Experience obtained in operating the Fast Flux Test Facility (FFTF) has provided a basis for field verification of remote NDT equipment designs and has suggested development improvements. Remote Viewing and data gathering systems used include periscopes, borescopes, fiberscopes, hybrid borescopes/fiberscopes, and closed circuit television. A summary of design consideration for inspection equipment and power plant design is presented to achieve improved equipment operation and reduction of plant maintenance downtime

  18. 21 CFR 111.27 - What requirements apply to the equipment and utensils that you use?

    Science.gov (United States)

    2010-04-01

    ... HEALTH AND HUMAN SERVICES (CONTINUED) FOOD FOR HUMAN CONSUMPTION CURRENT GOOD MANUFACTURING PRACTICE IN MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS Equipment and Utensils § 111... vessels; and (v) Equipment used in automated, mechanical, or electronic systems. (2) You must use...

  19. Power Service Shops

    Data.gov (United States)

    Federal Laboratory Consortium — TVA's Power Service Shops provides expert repair and maintenance of power system components and large industrial equipment. With world-class maintenance facilities...

  20. 78 FR 49756 - Notification of a Cooperative Agreement Award to the World Health Organization

    Science.gov (United States)

    2013-08-15

    ...: Notification of a sole source Cooperative Agreement Award to the World Health Organization for a grant titled... World Health Organization (WHO) as soon as possible, and any confirmed smallpox case would generate an... DEPARTMENT OF HEALTH AND HUMAN SERVICES Notification of a Cooperative Agreement Award to the World...

  1. 76 FR 23859 - Financial Management Service Proposed Collection of Information; Financial Institution Agreement...

    Science.gov (United States)

    2011-04-28

    ... DEPARTMENT OF THE TREASURY Fiscal Service Financial Management Service Proposed Collection of... Management Service, Fiscal Service, Treasury. ACTION: Notice and request for comments. SUMMARY: The Financial... collection. By this notice, the Financial Management Service solicits comments concerning the FMS 458 and FMS...

  2. 42 CFR 403.322 - Termination of agreements for Medicare recognition of State systems.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Termination of agreements for Medicare recognition of State systems. 403.322 Section 403.322 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS SPECIAL PROGRAMS AND PROJECTS Recognition of State...

  3. Return of IEEE Std 627 and its Value to Equipment Qualification Programs

    International Nuclear Information System (INIS)

    Horvath, D.A.

    2012-01-01

    IEEE Std 627 ''Design Qualification of Safety Systems Equipment Used in Nuclear Power Generating Stations'' was issued to more generically establish qualification requirements in the form of a high level umbrella document. Efforts on this standard began in late 1975 at the request of the IEEE Nuclear Standards Management Board. In 1977 a joint ASME/IEEE agreement established responsibility for qualification and quality assurance standards preparation. ASME accepted responsibility for Quality Assurance and IEEE for qualification. In accordance with that agreement, IEEE completed the generic qualification standard in 1980. This document provided high level approaches, criteria, guidance, and principles for qualification of both electrical and mechanical equipment that at that time appeared in no other industry standard. IEEE Std 627-1980 was later reaffirmed in 1996. In 1986, ASME's Board on Nuclear Codes and Standards directed its Committee on Qualification of Mechanical Equipment (QME) to develop a standard for qualifying mechanical equipment. This task was completed in several parts during the time frame from 1992 to 1994. Partly in response to this activity, IEEE Std 627 was withdrawn in 2002. Later although withdrawn, it was found that IEEE Std 627 was continuing to be used and referenced by many entities both in the US and other countries including in ASME's QME-1-2002 ''Qualification of Active Mechanical Equipment Used in Nuclear Power Plants'', US NRC's NUREG-0800 Standard Review Plan Section 3.11, at least one reactor vendor's Design Certification Document (DCD), several international licensing documents, and elsewhere. As a result, in 2007, the IEEE Standards Board authorized Working Group 2.10 of Subcommittee 2 (Qualification) of the Power and Energy Society's Nuclear Power Engineering Committee to resurrect and update IEEE Std 627-1980 (Reaff 1996). The result was the culmination IEEE Std 627 in 2010. This paper will report on the eight improvements made

  4. Inquiry about the uses of special equipment (CT equipment, angiography systems, mammography devices, screens)

    International Nuclear Information System (INIS)

    Schwager, P.; Stieve, F.E.

    1986-01-01

    There are at least 1100 special devices in medical establishment in Bavaria which require special inspection and surveillance with regard to quality of equipment and radiation protection. In addition, there are at least 53 tomographs available for operation, and at least 120 installed X-ray screens. These devices need special approval testing and quality control services as they contribute a very significant amount of the medically indicated radiation exposure of the population. Appropriate measures are explained that can be applied in order to reduce the medical radiation exposure to an optimum. (orig.) [de

  5. 48 CFR 227.675-2 - Review of agreements.

    Science.gov (United States)

    2010-10-01

    ... source when he has knowledge of any purchase made or to be made from him by or for the Government or by... a corresponding reduction in the purchase price of the article or service. (2) If the agreement... identify any such patents and data in which, to the knowledge of the primary source, the Government may...

  6. Measurement framework for product service system performance of generator set distributors

    Science.gov (United States)

    Sofianti, Tanika D.

    2017-11-01

    Selling Generator Set (Genset) in B2B market, distributors assisted manufacturers to sell products. This is caused by the limited resources owned by the manufacturer for adding service elements. These service elements are needed to enhance the competitiveness of the generator sets. Some genset distributors often sell products together with supports to their customers. Industrial distributor develops services to meet the needs of the customer. Generator set distributors support machines and equipment produced by manufacturer. The services delivered by the distributors could enhance value obtained by the customers from the equipment. Services provided to customers in bidding process, ordering process of the equipment from the manufacturer, equipment delivery, installations, and the after sales stage. This paper promotes framework to measure Product Service System (PSS) of Generator Set distributors in delivering their products and services for the customers. The methodology of conducting this research is by adopting the perspective of the providers and customers and by taking into account the tangible and intangible products. This research leads to the idea of improvement of current Product Service System of a Genset distributor. This research needs further studies in more detailed measures and the implementation of measurement tools.

  7. 78 FR 12368 - Priority Mail Contract; Negotiated Service Agreement

    Science.gov (United States)

    2013-02-22

    ... Counsel, at 202-789-6820. SUPPLEMENTARY INFORMATION: Table of Contents I. Introduction II. Notice of Filings III. Ordering Paragraphs I. Introduction On February 13, 2013, the Postal Service filed notice... ``supporting financial documentation and financial certification initially provided in this docket remain...

  8. Hydroelectric plants: economical and ecological consequences of equipment and exploitation variants

    International Nuclear Information System (INIS)

    Maire, P.; Bansard, J.F.; Do, T.

    1995-01-01

    The increasing number of renewal demands for hydroelectric plants authorizations has raised the question of the pertinency and efficiency of the equipments used. Choices are rarely clearly justified by the petitioners. After reminding the reasons and consequences of a given choice and equipment, the necessary steps of an authorization demand are illustrated by a concrete case. It shows that some equipment-management combinations can lead to a more satisfying economical and ecological balance-sheet than those generally proposed. The popularization of computer use allows the examining services to dispose of clear and pedagogical elements to select the regular choices. (J.S.). 10 refs., 11 figs., 2 tabs

  9. A model for reusing service knowledge based on an empirical case

    DEFF Research Database (Denmark)

    Ahmed-Kristensen, Saeema; Vianello, Giovanna

    2015-01-01

    between the service and design phases. Interviews with engineering designers and service engineers were conducted. Knowledge arising from servicing the drilling equipment that was identified as relevant for service engineers was compared to that relevant for engineering designers. Furthermore......, the mechanisms involved in the transfer of knowledge between service and design were investigated. Knowledge about changes, issues and improvements generated during service was found to be relevant to both groups; however, engineering designers were interested in knowledge of equipment at a component level...

  10. IAEA preparations for the year 2000 compliance of safeguards equipment systems

    International Nuclear Information System (INIS)

    Aparo, M.; Barnes, B.; Lewis, W.; Hsiung, Sue

    1999-01-01

    The Department of Safeguards, IAEA, has used equipment systems for acquiring relevant data to support safeguards evaluation and verification activities. Typically an equipment system consists of EPROM (embedded system), a connecting personal computer with instrument software for data acquisition, and may include data evaluation software. Complementing the equipment systems is a collection of general evaluation software systems (application software) which support the analysis of the acquired data. In preparing for the year 2000 compliance of all safeguards systems, SGTS (Safeguards Division of Technical Services) in IAEA, must ascertain the equipment systems and the evaluation software authorised for inspection use can properly operate through the passage of year 2000. We present the year 2000 challenge for these systems, the approach we use to tackle the problem, and the status of our year 2000 project. (author)

  11. BWR Services maintenance training program

    International Nuclear Information System (INIS)

    Cox, J.H.; Chittenden, W.F.

    1979-01-01

    BWR Services has implemented a five-phase program to increase plant availability and capacity factor in operating BWR's. One phase of this program is establishing a maintenance training program on NSSS equipment; the scope encompasses maintenance on both mechanical equipment and electrical control and instrumentation equipment. The program utilizes actual product line equipment for practical Hands-on training. A total of 23 formal courses will be in place by the end of 1979. The General Electric Company is making a multimillion dollar investment in facilities to support this training. These facilities are described

  12. 42 CFR 460.76 - Transportation services.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Transportation services. 460.76 Section 460.76... ELDERLY (PACE) PACE Administrative Requirements § 460.76 Transportation services. (a) Safety, accessibility, and equipment. A PACE organization's transportation services must be safe, accessible, and...

  13. Energy saving potential of energy services - experimentation on the life cycle of energy conversion equipment; Potentiel d'economies d'energie par les services energetiques - application au cycle de vie des equipements de conversion de l'energie

    Energy Technology Data Exchange (ETDEWEB)

    Dupont, M

    2006-12-15

    Energy efficiency services are growing in Europe but their role is still limited. In order to evaluate the potential, we focused first of all on policy, economical and environmental mechanisms that support their development. European natural gas and electricity markets, that are now almost wholly de-regulated, are analysed and compared to their historical structure. By introducing uncertainty on energy prices, this new deal translates better the real energy costs. Energy performance contracts (EPC) limit the impact of these uncertainties on the customer energy bills by guaranteeing a financial result. As a result of the modelling of these contracts, namely operation and maintenance ones, we prove that they transfer technical and financial risks from building owners to energy service companies (ESCO) making energy saving measures easier and less expensive at the same time. These contracts are relatively widespread for heating or compressed-air processes but remain marginal for air-conditioning systems. So new methods were needed to guarantee on the long terms the efficiency of air-conditioning systems demand (1) to master the process and its performances and (2) to be able to determine precisely the energy saving potential and its realisation costs. A detailed energy audit is thus necessary for which we propose a guidance. Conclusions of audits carried out prove that energy saving potential is mainly located in equipment management and control. These optimizations are not always carried out because of a lack of contractual incentive and due to the weaknesses of audit methods. Through the involvement of an independent expert, the mandatory and regular inspection of air-conditioning systems may allow to verify and guide such practices. A three-step analysis procedure has been developed in order to maximize the inspection potential and to get higher benefits from service contracts. (author)

  14. PLANNING NATIONAL RADIOTHERAPY SERVICES

    Directory of Open Access Journals (Sweden)

    Eduardo eRosenblatt

    2014-11-01

    Full Text Available Countries, states and island nations often need forward planning of their radiotherapy services driven by different motives. Countries without radiotherapy services sponsor patients to receive radiotherapy abroad. They often engage professionals for a feasibility study in order to establish whether it would be more cost-beneficial to establish a radiotherapy facility. Countries where radiotherapy services have developed without any central planning, find themselves in situations where many of the available centres are private and thus inaccessible for a majority of patients with limited resources. Government may decide to plan ahead when a significant exodus of cancer patients travel to another country for treatment, thus exposing the failure of the country to provide this medical service for its citizens. In developed countries the trigger has been the existence of highly visible waiting lists for radiotherapy revealing a shortage of radiotherapy equipment.This paper suggests that there should be a systematic and comprehensive process of long-term planning of radiotherapy services at the national level, taking into account the regulatory infrastructure for radiation protection, planning of centres, equipment, staff, education pr

  15. DER Certification Laboratory Pilot, Accreditation Plan, and Interconnection Agreement Handbook

    Energy Technology Data Exchange (ETDEWEB)

    Key, T.; Sitzlar, H. E.; Ferraro, R.

    2003-11-01

    This report describes the first steps toward creating the organization, procedures, plans and tools for distributed energy resources (DER) equipment certification, test laboratory accreditation, and interconnection agreements. It covers the activities and accomplishments during the first period of a multiyear effort. It summarizes steps taken to outline a certification plan to assist in the future development of an interim plan for certification and accreditation activities. It also summarizes work toward a draft plan for certification, a beta Web site to support communications and materials, and preliminary draft certification criteria.

  16. Services for nuclear power stations

    International Nuclear Information System (INIS)

    Fremann, M.; Ryckelynck

    1987-01-01

    This article gives an information as complete as possible about the activities of the french nuclear industry on the export-market. It describes the equipment and services available in the field of services for nuclear power stations [fr

  17. 7 CFR 61.33 - Equipment of sampler; contents of certificate.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Equipment of sampler; contents of certificate. 61.33 Section 61.33 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS...

  18. The critical role of community-based micro-grants for disability aids and equipment: results from a needs analysis.

    Science.gov (United States)

    Muenchberger, Heidi; Ehrlich, Carolyn; Parekh, Sanjoti; Crozier, Michelle

    2016-01-01

    To investigate the role of philanthropic micro-grants (maximum of $10,000) in the provision of aids and equipment for adults (aged 18-65 years of age) with complex disabilities and examine key trends in aids and equipment requests. This study examined, through quantitative and qualitative analysis, aids and equipment requests (n = 371 individual applications as represented by 136 service organisations in three Australian states) received by a not-for-profit (NFP) organisation across five consecutive years of an innovative micro-grants scheme. Findings highlight that living situation (living with family or living independently) significantly influences the nature of requests for respite, aids, equipment and home modifications. Specifically, people with complex disabilities living with their families require greater combined service provision (higher equipment need, respite support, home modifications) than those living independently (equipment need only). Type of disability did not influence request type. Qualitative data further indicated the "last resort" nature of respite requests, particularly for younger applicants (under 45 years of age) indicating critical unmet needs in the community. Results demonstrate the vital role of NFP organisations and philanthropic funds in supporting daily lifestyle aids and equipment (including respite) that might otherwise not be funded for people with complex disabilities. Although preliminary in its scope and prior to implementation of a National Disability Insurance Scheme (NDIS) in Australia, findings suggest both opportunity and risk to the uptake of community-based micro-grant funding: opportunity for users through the provision of essential aids and lifestyle supports, and risk through over-subscription and devolving of responsibility for critical support resources from public sector. The aids and equipment needs of adults under the age of 65 appear to have been underestimated, poorly defined and under-serviced

  19. Rules and procedures for the design and operation of hazardous research equipment

    International Nuclear Information System (INIS)

    1978-12-01

    The manual has been prepared for use by research personnel involved in experiments at the Lawrence Berkeley Laboratory. It contains rules and procedures for the design, test, installation, and operation of hazardous research equipment. Sect. I contains such information as responsibility of experimenters for safety, descriptions of the various Laboratory safety organizations, and enumeration of various services available to experimenters at the Laboratory. Sect. II describes specific rules for the setup and operation of experimental equipment at the Laboratory. Sect. III gives detailed design criteria and procedures for equipment frequently encountered in the high energy physics laboratory

  20. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    Energy Technology Data Exchange (ETDEWEB)

    Chang, C.K., E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of); Lee, K.J., E-mail: klee@khu.ac.kr [Kyung Hee Univ., Seoul (Korea, Republic of)

    2014-07-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  1. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    International Nuclear Information System (INIS)

    Chang, C.K.; Lee, K.J.

    2014-01-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  2. The role of lubricant analysis in maximizing lubricant and equipment life

    International Nuclear Information System (INIS)

    Janis, J.

    1995-01-01

    Lubricant analysis has always played an important yet somewhat invisible role in equipment health monitoring. At its most primitive, simple observations and field testing alert equipment operators to changing conditions. At its most advanced, data from performance and analytical tests are used to develop or select optimum lubricants for service, stretch drain intervals, predict remaining equipment life and identify potential equipment or system problems at an incipient stage. Coupled with thermography and vibration analysis, lubricant analysis can become a major component of a comprehensive predictive maintenance (PM) program. Ontario Hydro finds itself at a turning point regarding the use and monitoring of lubricants. Increasing emphasis on equipment reliability and plant life extension, coupled with major, recent changes in lubricant composition in response to environmental, energy and safety concerns, forces an upgrading of many aspects of lubricant monitoring so that it may establish itself as a key part of modern PM practices. This paper discusses some of these aspects. (author)

  3. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Science.gov (United States)

    2010-10-01

    ...'s length basis. (4) Any research or development performed on a joint or separate basis for the subsidiary must be done on a compensatory basis. Except for generic software within equipment, manufactured... facilities used in interstate communications, which employ computer processing applications that act on the...

  4. Designing for in-service inspection

    International Nuclear Information System (INIS)

    Dixit, K.B.

    2002-01-01

    The process of design of components, equipment and systems normally focuses on functional requirements, integrity and environmental conditions. Manufacturing processes, fabricability, inspectability and maintainability in service are considered while designing. Provisions for the requirements of ISI also need to be given due consideration while designing the systems, equipment and components

  5. Model-Checking Web Services Business Activity Protocols

    DEFF Research Database (Denmark)

    Marques, Abinoam P.; Ravn, Anders Peter; Srba, Jiri

    2013-01-01

    Web Services Business Activity specification defines two coordination protocols BAwCC (Business Agreement with Coordination Completion) and BAwPC (Business Agreement with Participant Completion)that ensure a consistent agreement on the outcome of long-running distributed applications. In order...

  6. Sanitization and Disposal of Excess Information Technology Equipment

    Science.gov (United States)

    2009-09-21

    Report No. D-2009-104 September 21, 2009 Sanitization and Disposal of Excess Information Technology Equipment...2009 2. REPORT TYPE 3. DATES COVERED 00-00-2009 to 00-00-2009 4. TITLE AND SUBTITLE Sanitization and Disposal of Excess Information Technology ...Defense (Networks and Information Integration)/DOD Chief Information Officer DRMS Defense Reutilization and Marketing Service IT Information

  7. Calibration of radioprotection equipment gamma radiation at the Laboratory of Ionizing Radiation Metrology - DEN/UFPE

    International Nuclear Information System (INIS)

    Nazario, Macilene; Khoury, Helen; Hazin, Clovis

    2003-01-01

    This work presents aspects of the radioprotection equipment calibration service of the Laboratory for Metrology of Ionizing Radiations (LMRI) of the DEN/UFPE related to the calibration procedures, characteristics of the radiation beam and the evaluation of equipment calibrated in the period of 2001-2002. The LMRI-DEN/UFPE is one of the four laboratories in Brazil licensed by the Brazilian Nuclear Energy Commission for the execution of calibration services on area, surface contamination and personal monitors used by industries, hospitals, universities and research institutes using radioactive sources

  8. Assessment of the causes of failures of roto-dynamic equipment in Cirus

    International Nuclear Information System (INIS)

    Rao, K.N.; Singh, S.; Ganeshan, P.

    1994-01-01

    As a part of Cirus reactor life extension program study, a service life evaluation of critical roto-dynamic equipment in Cirus such as primary coolant pumps, and their concrete foundation structures, pressurised water loop pumps, main air compressors and supply and exhaust fans, was performed. An assessment of the causes of failures of roto-dynamic equipment in Cirus was done. Based on assessment of the degradation mitigating features and comparison to similar roto-dynamic equipment and their concrete foundation structures, it was concluded that life extension of these roto-dynamic equipment and their structures is feasible. To support this conclusion a program involving: a) non-destructive testing, b) surveillance and monitoring and, c) preventive maintenance is recommended. (author). 4 refs

  9. Telelibrary: Library Services via Satellite.

    Science.gov (United States)

    Liu, Rosa

    1979-01-01

    Investigates the provision of library services via satellite, explains briefly the operation and advantages of communication satellites, and discusses the various telecommunications equipment and services which, when coupled with satellite transmission, will enhance library activities. Demand trend projections for telecommunications services…

  10. Equipment and techniques developed for the repair of reactor standpipes

    International Nuclear Information System (INIS)

    Hartnell, P.; Kirton-Darling, H.F.R.; Walton, D.N.

    1993-01-01

    In-service cracks had developed in welds in the fabrication at the bottom of the standpipe liner at Hinkley Point-B and Hunterston-B reactors. A joint team investigating these cracks determined that the hot gas flow patterns in the plug unit to standpipe liner annulus were unstable. This had led to thermal stressing and consequent cracking of the standpipe liner welds. In developing a solution consideration was to be given to access down the standpipe for equipment, ambient temperatures, radiation levels and safety considerations. The procedures and equipment developed are described. (author)

  11. 76 FR 77015 - Privacy Act of 1974; Computer Matching Agreement

    Science.gov (United States)

    2011-12-09

    ... DEPARTMENT OF JUSTICE [AAG/A Order No. 001/2011] Privacy Act of 1974; Computer Matching Agreement AGENCY: Department of Justice. ACTION: Notice--computer matching between the Department of Justice and the Internal Revenue Service, Department of Treasury. SUMMARY: In accordance with the Privacy Act of...

  12. Report of the Instrumentation Service - Annex C

    International Nuclear Information System (INIS)

    Mikic, N.; Majstorovic, D.

    1993-01-01

    This report describes the tasks and organizational structure of the Instrumentation service. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment, inspection of the reactor vessel and spent fuel storage pool and describes activities related to renewal of the equipment [sr

  13. Report of the Instrumentation Service - Annex C

    International Nuclear Information System (INIS)

    Majstorovic, D.

    1986-01-01

    This report describes the tasks and organizational structure of the Instrumentation service. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment, inspection of the reactor vessel and spent fuel storage pool and describes activities related to renewal of the equipment [sr

  14. Report of the Instrumentation Service - Annex C

    International Nuclear Information System (INIS)

    Majstorovic, D.

    1988-01-01

    This report describes the tasks and organizational structure of the Instrumentation service. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment, inspection of the reactor vessel and spent fuel storage pool and describes activities related to renewal of the equipment [sr

  15. Electric personnel carrier introduced : RES Equipment Sales spearheads development of electric underground vehicle

    International Nuclear Information System (INIS)

    Tollinsky, N.

    2010-01-01

    RES Equipment Sales of Dryden, Ontario is leading the development of a battery-powered personnel utility vehicle for underground mining applications. Among the advantages of the battery-powered personnel carrier are quietness of the carrier and zero emissions, which eliminates particulates from diesel engines and reduces the need for ventilation. This article discussed the design and building of the vehicle. It was designed to accommodate up to 3 battery packs, depending on the frequency of use. Swapping batteries takes between 2 or 3 minutes. Spent batteries must be plugged in for 6 hours and rest for another 6 to 8 hours before being ready for service. The vehicle accommodates 2 or 3 people and travels at speeds of 6 to 8 miles per hour. This article also provided background information on RES Equipment Sales. The company remanufactures underground mining equipment, including load-haul-dump machines, jumbos, haul trucks and utility vehicles. In addition, the company sells and services new equipment, including Oldenburg Cannon jumbos, scalers and utility vehicles, as well as Canun International pneumatic rock drills and NPK rock breakers. 1 ref., 1 fig.

  16. Laboratory equipment maintenance: a critical bottleneck for strengthening health systems in sub-Saharan Africa?

    Science.gov (United States)

    Fonjungo, Peter N; Kebede, Yenew; Messele, Tsehaynesh; Ayana, Gonfa; Tibesso, Gudeta; Abebe, Almaz; Nkengasong, John N; Kenyon, Thomas

    2012-02-01

    Properly functioning laboratory equipment is a critical component for strengthening health systems in developing countries. The laboratory can be an entry point to improve population health and care of individuals for targeted diseases - prevention, care, and treatment of TB, HIV/AIDS, and malaria, plus maternal and neonatal health - as well as those lacking specific attention and funding. We review the benefits and persistent challenges associated with sustaining laboratory equipment maintenance. We propose equipment management policies as well as a comprehensive equipment maintenance strategy that would involve equipment manufacturers and strengthen local capacity through pre-service training of biomedical engineers. Strong country leadership and commitment are needed to assure development and sustained implementation of policies and strategies for standardization of equipment, and regulation of its procurement, donation, disposal, and replacement.

  17. Photovoltaics. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of companies providing products and services in the area of photovoltaics. The subheadings of the directory include developers and distributors, equipment manufacturers, measuring instruments and controls, consulting services, engineering and construction, operation and maintenance, project management, repair, and financial and legal services

  18. Launcher In-Service Workspace

    Data.gov (United States)

    Federal Laboratory Consortium — Purpose:Through Engineering Investigations (EIs), testing, development, evaluation and system integration of Aircraft Launch and Recovery Equipment (ALRE) in-service...

  19. Maintenance or replacement of primary equipments

    International Nuclear Information System (INIS)

    Branchu, J.

    1995-01-01

    The principal materials, such as the primary equipments of a PWR type steam generator, have a finite service life. Framatome, builder of steam generators and maintenance contractor of Electricite de France has developed a methodology for the maintenance or the replacement of primary equipments. The paper describes the methodology followed by Framatome to identify and localize the wear mode and to treat or repair the component. Four failure modes have been considered: crack propagation, rubbing/vibration wear, neutron irradiation and corrosion propagation under permanent stress. A kinetic modelling of wear propagation has been computerized and validated using mechanical tests on Inconel 600 mockups. These analyses have allow to determine the strategy of repair or replacement of vessel heads for each unit. The method is evaluated taking into account the risk assessment, cost, dosimetry, efficiency and time delay involved. (J.S.). 1 fig., 3 photos

  20. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  1. Three-factor anonymous authentication and key agreement scheme for Telecare Medicine Information Systems.

    Science.gov (United States)

    Arshad, Hamed; Nikooghadam, Morteza

    2014-12-01

    Nowadays, with comprehensive employment of the internet, healthcare delivery services is provided remotely by telecare medicine information systems (TMISs). A secure mechanism for authentication and key agreement is one of the most important security requirements for TMISs. Recently, Tan proposed a user anonymity preserving three-factor authentication scheme for TMIS. The present paper shows that Tan's scheme is vulnerable to replay attacks and Denial-of-Service attacks. In order to overcome these security flaws, a new and efficient three-factor anonymous authentication and key agreement scheme for TMIS is proposed. Security and performance analysis shows superiority of the proposed scheme in comparison with previously proposed schemes that are related to security of TMISs.

  2. Beyond the gats: Implicit engines in services RTAs

    Directory of Open Access Journals (Sweden)

    Daniltsev Alexander

    2015-01-01

    Full Text Available In the last 15 years the reciprocity of regional trade agreements on services has become a global phenomenon. Whereas main provisions regulating access to the services market are fixed by specific obligations under the General Agreement on Trade in Services, RTAs have been considered a flexible means for liberalization and an expedient to protect national service providers. This article explores the role of the GATS and other agreements, both under and not under the mandate of the World Trade Organization, in trade blocs. The econometric model developed by the authors shows that the removal of restrictions for foreign suppliers under domestic regulation (consumer protection, regulation of labor market and the elimination of discriminatory measures on foreign investments that affect trade in goods are likely to be more important for the expansion of services trade on a preferential basis than the GATS-type liberalization.

  3. Data Network Equipment Energy Use and Savings Potential in Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lanzisera, Steven; Nordman, Bruce; Brown, Richard E.

    2010-06-09

    Network connectivity has become nearly ubiquitous, and the energy use of the equipment required for this connectivity is growing. Network equipment consists of devices that primarily switch and route Internet Protocol (IP) packets from a source to a destination, and this category specifically excludes edge devices like PCs, servers and other sources and sinks of IP traffic. This paper presents the results of a study of network equipment energy use and includes case studies of networks in a campus, a medium commercial building, and a typical home. The total energy use of network equipment is the product of the stock of equipment in use, the power of each device, and their usage patterns. This information was gathered from market research reports, broadband market penetration studies, field metering, and interviews with network administrators and service providers. We estimate that network equipment in the USA used 18 TWh, or about 1percent of building electricity, in 2008 and that consumption is expected to grow at roughly 6percent per year to 23 TWh in 2012; world usage in 2008 was 51 TWh. This study shows that office building network switches and residential equipment are the two largest categories of energy use consuming 40percent and 30percent of the total respectively. We estimate potential energy savings for different scenarios using forecasts of equipment stock and energy use, and savings estimates range from 20percent to 50percent based on full market penetration of efficient technologies.

  4. Geothermal. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of companies providing products and services in the area of geothermal power. The subheadings of the directory include developers and owner operators, equipment manufacturers, measuring instruments and controls, consulting services, engineering and construction, operation and maintenance, project management, repair, and financial and legal services

  5. Hydropower. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of companies providing products and services in the area of hydroelectric power. The subheadings of the directory include developers and owner operators, equipment manufacturers, measuring instruments and controls, consulting services, engineering and construction, operation and maintenance, project management, repair, and financial and legal services

  6. Windpower. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of companies providing products and services in the area of wind power. The subheadings of the directory include developers and owner operators, equipment manufacturers, measuring instruments and controls, consulting services, engineering and construction, operation and maintenance, project management, repair, and financial and legal services

  7. Agreement between photographic screening and hospital biomicroscopy grading of diabetic retinopathy and maculopathy.

    Science.gov (United States)

    Healy, Rachel; Sallam, Ahmed; Jones, Vanessa; Donachie, Paul H J; Scanlon, Peter H; Stratton, Irene M; Johnston, Robert L

    2014-01-01

    To examine the level of agreement and reasons for disagreement between grading of diabetic retinopathy and maculopathy using mydriatic digital photographs in a diabetic retinopathy screening service (DRSS) and hospital eye service (HES). English NHS Diabetic Eye Screening Programme grades for diabetic retinopathy prospectively recorded on a hospital electronic medical record were compared to the grades from the DRSS event that prompted referral. In cases of disagreement, images were reviewed. Data for 1,501 patients (3,002 eyes) referred between 2008 and 2011 were analyzed. The HES retinopathy grades were R0 (no retinopathy) in 341 eyes, R1 (background retinopathy) in 1,712 eyes, R2 (pre-proliferative retinopathy) in 821 eyes, and R3 (proliferative retinopathy) in 128 eyes. The DRSS grades were in agreement in 2,309 eyes (76.9%), recorded a lower grade in 227 eyes, and recorded a higher grade in 466 eyes. Agreement was substantial (κ = 0.65). The commonest cause for disagreement was overgrading of R1 as R2 by hospital clinicians. The HES maculopathy grades were M0 (no maculopathy) in 2,267 eyes and M1 (maculopathy) in 735 eyes. The DRSS were in agreement in 2,111 eyes (70.2%), recorded a lower grade in 106 eyes, and recorded a higher grade in 785 eyes. Agreement was fair (κ = 0.39). The commonest cause for disagreement was hospital clinicians missing fine exudates. This study establishes a benchmark standard for agreement between HES and DRSS grading. Review of DRSS and grading reports images for newly referred patients is likely to improve levels of agreement, particularly for diabetic retinopathy, and should be strongly encouraged.

  8. Equipment and physical plant changes in response to the Fukushima event

    International Nuclear Information System (INIS)

    Newman, G.

    2013-01-01

    The Fukushima event led the international nuclear industry and regulatory bodies to challenge the ability of existing nuclear power plants to prevent and mitigate the effects of a severe external event leading to a total loss of AC power and resultant loss of cooling. Canadian Nuclear Industry's immediate response was to provide a high level of assurance that the existing plant is in a high state of readiness to deal with design basis and beyond design basis events, verify the capability of the existing plant to deal with beyond design basis events (equipment, procedures, staff qualification, external support agreements, etc), verify capability to mitigate station black out events, verify capability to cope with internal and external floods and address vulnerabilities to seismically induced damage to mitigation equipment.

  9. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  10. On capabilities of thermomechanical treatment in increasing durability of short service life elements of mining аnd processing equipment

    Directory of Open Access Journals (Sweden)

    В. И. Болобов

    2016-11-01

    Full Text Available Hadfield steel (110G13L is the basic material for fast wornout items of mining equipment: beaters, hammers, liners, refractory plates of crushers and mills. By way of example, the effect of cold hardening was specifically analyzed on the rate of wear of mining equipment parts for various types of wear by hard (more than 1100 HV and soft rock. A unique ability of that steel to resist shock wear is noted. It is shown that this steel exhibits low resistance to abrasive rock wear. Meanwhile wear by rock of hardness lower than steel (less than 1100 HV, may be substantially increased by pre-hardening of samples (up to 10-fold. In case of wear by high hardness rocks, shock impact that should contribute to hardening of the material, fails  to increase abrasive wear resistance of Hadfield steel, and in that parameter it does not differ from the conventional medium carbon steel 45. Also, the authors of this article describe a technique they developed of high-temperature thermomechanical treatment of specimen of Hadfield steel (free forging at 1150-950ºC and subsequent quenching in water and experiments in their abrasion. The results of tests show that hardness and wear resistance of Hadfield steel to hard abrasive (corundum 25A with aggregate hardness of ~2500 HV increases with plastic deformation at HTMT. For maximum plastic deformation intensity (deformation magnitude of α = 2.25, reached in the experiments by the authors, wear resistance grew by 70% as compared to undeformed steel. The dependence is presented of wear resistance of steel on hardness, HV, achieved in the result of plastic deformation. Since a similar positive effect was obtained earlier by the authors for 35HGSA steel, also used in mining machinery, they conclude that the HTMT technique may be recommended for treating short lived parts of the mining and mineral processing equipment to increase their service life.

  11. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  12. Challenges on preparing unitization agreements in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro, Marilda Rosado de Sa [Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil). Faculdade de Direito; Appi, Valeria Tiriba [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    and selling agreement, transportation, services and others. (author)

  13. Field size and centring for conventional X-ray equipment

    International Nuclear Information System (INIS)

    Klimpel, H.; Kreienfeld, H.; Overbeck, R.

    1989-01-01

    Since 1973, all X-ray equipment for medical applications in the Federal Republic of Germany has had to be examined according to the requirements of the German ''Rontgenverordnung'' before it is used on patients and after each essential modification of design or construction. These examinations are carried out by inspectors appointed by the authorities, e.g. TUV. The field size adjustment and the centring of the radiation beam in relation to the image reception area is checked, along with other tests. To increase quality assurance in X-ray diagnosis, since the mid-1980s X-ray equipment has also been subject to in-service inspections to an increasing extent. (author)

  14. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  15. Power supplies and equipment for military field research: lessons from the British Service Dhaulagiri Research Expedition 2016.

    Science.gov (United States)

    Howard, Matt; Bakker-Dyos, J; Gallagher, L; O'Hara, J P; Woods, D; Mellor, A

    2018-02-01

    The British Service Dhaulagiri Research Expedition (BSDMRE) took place from 27 March to 31 May 2016. The expedition involved 129 personnel, with voluntary participation in nine different study protocols. Studies were conducted in three research camps established at 3600, 4600 and 5140 m and involved taking and storing blood samples, cardiac echocardiography and investigations involving a balance plate. Research in this remote environment requires careful planning in order to provide a robust and resilient power plan. In this paper we aim to report the rationale for the choices we made in terms of power supply, the equipment used and potential military applicability. This is a descriptive account from the expedition members involved in planning and conducting the medical research. Power calculations were used to determine estimates of requirement prior to the expedition. The primary sources used to generate power were internal combustion engine (via petrol fuelled electric generators) and solar panels. Having been generated, power was stored using lithium-ion batteries. Special consideration was given to the storage of samples taken in the field, for which electric freezers and dry shippers were used. All equipment used functioned well during the expedition, with the challenges of altitude, temperature and transport all overcome due to extensive prior planning. Power was successfully generated, stored and delivered during the BSDMRE, allowing extensive medical research to be undertaken. The challenges faced and overcome are directly applicable to delivering military medical care in austere environments, and lessons learnt can help with the planning and delivery of future operations, training exercises or expeditions. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  16. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    International Nuclear Information System (INIS)

    D. Tillman; E. Hughes

    1999-01-01

    During the period of April 1, 1999 through June 30, 1999, wood cofiring testing at both Seward Generating Station of GPU Genco and Bailly Generating Station of Northern Indiana Public Service Company provided the focus for all activities. In both cases, the testing was directed at the impacts of cofiring on efficiency, operability, and NO(sub x) emissions. This report summarizes the activities during the second calendar quarter in 1999 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing activities at both generating stations

  17. Use of operator-provided, installed C/S equipment in IAEA safeguards

    International Nuclear Information System (INIS)

    Shea, T.; Rundquist, D.; Gaertner, K.; Yellin, E.

    1987-01-01

    Developing solutions for complex safe guards problems in close cooperation with Operators is becoming more common, especially as the IAEA continues to operate under zero-growth limitations. This has in practice taken on various forms; from the extreme case of very specific equipment developed and constructed by the State/Operator for use in only one facility, to the more normal case where only the development is carried out by the State/Operator. This practice has advantages and disadvantages. For example, to ensure that Agency inspections will be carried out in a predictable manner, it will be in the Operator's interest to ensure that any equipment he provides is of the highest quality, meets all national safety requirements, and is installed and maintained in such a manner that it will provide years of service. Agency equipment performs its intended function in a reliable manner, but with very specific, limited applications in mind, improvements in reliability over that obtained with normal Agency equipment are to be expected. Also, the authors experience is that reaching acceptable arrangements for the use of State- of Operator-supplied equipment is often far more straightforward than when arranging to apply Agency equipment

  18. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  19. Cogeneration. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of suppliers of products and services in the area of cogeneration. The subheadings of this directory include developers and owner operators, system packagers, manufacturers of prime movers, equipment manufacturers, instruments and controls manufacturing, consulting services, appraisal and valuation, computer services, environmental services, feasibility services, hydrology, marketing, measurements, meteorology, regulatory and licensing, research, testing, training and personnel, engineering and construction, operations and maintenance, and insurance, financial and legal services

  20. 76 FR 44592 - Cooperative Agreement With the World Health Organization Department of Food Safety and Zoonoses...

    Science.gov (United States)

    2011-07-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-N-0010] Cooperative Agreement With the World Health Organization Department of Food Safety and Zoonoses in Support of... agreement with the World Health Organization. The document published stating that the total funding...

  1. Zirconium-made equipment for the new La Hague reprocessing plants

    International Nuclear Information System (INIS)

    Decours, J.; Demay, R.; Bernard, C.; Mouroux, J.P.; Simonnet, J.

    1991-01-01

    The use of zirconium was developed to solve some problems of severe corrosion in boiling nitric medium, and to guarantee the service life of the equipment concerned. The paper presents the experience gained since the early 1970s, when the first units made of zirconium were used in French reprocessing plants. For the new La Hague UP3 and UP2 800 plants, it was decided to extend the use of zirconium to make large-scale equipment and, to do so, a major R and D program was implemented, of which the main results are presented

  2. Negotiating and structuring the power purchase agreement (PPA)

    International Nuclear Information System (INIS)

    Wallace, R.B.

    1999-01-01

    In order to meet the needs of both generators and consumers, there are several factors which affect electricity sales that should be considered when negotiating a power purchase agreement. Most importantly, it should be known whether a project is being developed by the end user for its own use, or whether it is being developed by an independent power producer (IPP) for sale to the Power Pool, or directly to others. This paper described a joint venture as being an IPP which can sell power to the Power Pool, an eligible industrial user, or its host (usually to the most economically attractive buyer). Natural gas deregulation provided a big incentive for IPPs to develop new power projects. The things to consider in traditional power purchase arrangements are requests for proposals, the seller's response and a memorandum of understanding. The principle terms of a traditional bilateral power purchase agreement involve the nature of the services to be provided, pricing, termination terms, facilities issues, force majeure and changes in law. This paper also discussed market alternatives to the traditional power purchase agreement. 1 appendix

  3. An Agent-Based Model for the Role of Short-Term Memory Enhancement in the Emergence of Grammatical Agreement.

    Science.gov (United States)

    Vera, Javier

    2018-01-01

    What is the influence of short-term memory enhancement on the emergence of grammatical agreement systems in multi-agent language games? Agreement systems suppose that at least two words share some features with each other, such as gender, number, or case. Previous work, within the multi-agent language-game framework, has recently proposed models stressing the hypothesis that the emergence of a grammatical agreement system arises from the minimization of semantic ambiguity. On the other hand, neurobiological evidence argues for the hypothesis that language evolution has mainly related to an increasing of short-term memory capacity, which has allowed the online manipulation of words and meanings participating particularly in grammatical agreement systems. Here, the main aim is to propose a multi-agent language game for the emergence of a grammatical agreement system, under measurable long-range relations depending on the short-term memory capacity. Computer simulations, based on a parameter that measures the amount of short-term memory capacity, suggest that agreement marker systems arise in a population of agents equipped at least with a critical short-term memory capacity.

  4. Long term agreements energy efficiency. Progress 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-11-01

    Long Term Agreements (LTAs) on energy efficiency have been contracted with various business sectors since 1992, as part of energy conservation policy: industrial sectors, commercial services, agrarian sectors and non-profit services. LTAs are voluntary agreements between a specific sector and the Minister of Economic Affairs. In some cases, the Minister of Agriculture, Nature Management and Fisheries is also involved. The sector commits to an effort to improve energy efficiency by a particular percentage within an agreed period. As at 31 December 1999, a total of 29 LTAs had been contracted with industrial sectors and 14 with non-industrial ones. This report describes the progress of the LTAs in 1999. It reviews the energy efficiency improvements realised through the LTAs, both overall and in each individual sector. The aim is to make the efforts and results in the various sectors accessible to the general public. Appendix 1 describes the positioning of the LTA instrument. This Appendix provides and insight into the position of the LTAs within the overall set of policy instruments. It also covers the subsidy schemes and fiscal instruments that support the LTAs, the relationships between LTAs and environmental policy and new developments relating to the LTAs in the years ahead. Appendices 2 to 6 contain the reports on the LTAs and a list of abbreviations (Appendix 7)

  5. EQUIP training the trainers: an evaluation of a training programme for service users and carers involved in training mental health professionals in user-involved care planning.

    Science.gov (United States)

    Fraser, C; Grundy, A; Meade, O; Callaghan, P; Lovell, K

    2017-08-01

    WHAT IS KNOWN ON THE SUBJECT?: UK NHS policy highlights the importance of user and carer involvement in health professional training. We know little about service user and carer motivations and experiences of accessing training courses for delivering training to health professionals and how well such courses prepare them for delivering training to healthcare professionals. 'Involvement' in training has often been tokenistic and too narrowly focused on preregistration courses. There is limited data on how best to prepare and support potential service user and carer trainers. WHAT DOES THIS PAPER ADD TO EXISTING KNOWLEDGE?: This study adds to the international literature by highlighting service user and carer motivations for accessing a training course for delivering training to health professionals. Service users and carers wanted to gain new skills and confidence in presentation/facilitation as well as to make a difference to healthcare practice. We also learned that service users desired different levels of involvement in training facilitation - some wanted to take a more active role than others. A one-size-fits-all approach is not always appropriate. Encountering resistance from staff in training was a previously unidentified challenge to service user and carers' experience of delivering training in practice and is a key challenge for trainers to address in future. Professional training involvement can be enhanced via specialist training such as the EQUIP training the trainers programme evaluated here. WHAT ARE THE IMPLICATIONS FOR PRACTICE?: When training service users and carers to deliver training to mental health professionals, it is important that service users are equipped to deal with resistance from staff. It is important that service user and carer roles are negotiated and agreed prior to delivering training to healthcare professionals to accommodate individual preferences and allay anxieties. Training for service users and carers must be offered

  6. THE ROLE OF REGIONAL TRADE AGREEMENTS IN THE GLOBAL ECONOMY

    Directory of Open Access Journals (Sweden)

    IRINA GABRIELA RADULESCU

    2010-12-01

    Full Text Available Regional and sub-regional groups having an integrative character appeared after the war and they aimed at harmonizing their economic policies, and, at the same time, they ensured, in accordance with the agreed degree of integration, free turnover of goods, products, services, capitals and labor force. By setting up these international economic organizations, the states of the world and especially developing countries wanted to improve their efforts for a sustained economic growth, to counteract the effects of the unequal external affairs and to eliminate underdevelopment. Some of the regional agreements that represent the new regionalism have been motivated politically and they were stimulated by the conviction that good agreements do not necessarily stand for good neighbors. Such agreements consolidate good diplomatic practices and their objective is to reduce the inevitable confrontation that may appear as a result of com

  7. Quality control for dental X-rays equipment and film developers

    International Nuclear Information System (INIS)

    Pomares C, Martin

    1998-01-01

    Quality control in five dental X-ray equipments, film and film developers was done. It was for evaluating the radiologic practices in the odontologic services too. This work was made based on international standards, the results will be used for future works in quality assurance in dental radiology

  8. 26 CFR 301.6323(c)-2 - Protection for real property construction or improvement financing agreements.

    Science.gov (United States)

    2010-04-01

    ... agreement described in subparagraph (3) of this paragraph (b), the furnishing of goods and services is... SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) PROCEDURE AND ADMINISTRATION PROCEDURE AND ADMINISTRATION... into existence after the tax lien filing, (2) Is in qualified property covered by the terms of a real...

  9. The Mecklenburg County Interlocal Agreement: An 18-Year Collaboration Between Medicine and Public Health.

    Science.gov (United States)

    Piper, Crystal N; Plescia, Marcus; Keener, Stephen R; DeHaven, Mark

    Better integration of public health and medical services has been a long-standing goal in the United States and has been widely discussed in the scientific literature. To identify key lessons and outcomes of the Mecklenburg County Interlocal Agreement, one of the longest running efforts integrating health care delivery and public health services in a major metropolitan area. In-depth key informant interviews and brief questionnaires of leaders involved in the Mecklenburg County Interlocal Agreement. Charlotte-Mecklenburg County, North Carolina. Convenience sample of 15 past and present employees and administrative leaders of the Mecklenburg County Privatization Initiative from the Mecklenburg County Health Department (N = 7) and Carolinas Healthcare System (N = 8). Attitudes reflecting the effects of the Mecklenburg County Privatization Initiative, based on 6 "synergies" for evaluating the effectiveness of health care and public health system collaboration. Mean scores were calculated for 21 questionnaire items, using 5-point Likert scales (1 = no impact; 5 = great impact). Mean scores were calculated by averaging the multiple-item question sets reflecting each of the 6 synergies. Synergy scores ranged from a low of 3.1 (3 items reflecting whether the collaboration "Used clinical practice to identify and address community health problems") to a high of 3.7 (3 items reflecting whether the collaboration "Improved health care by coordinating services for individuals"). The in-depth interviews indicated a clear impact for the 2 synergies linked to individual care. Increased access to care emerged as a strong theme, along with the belief that medical care services were improved and that these improvements persist. The findings of this study provide perspective from an 18-year contractual agreement for a large health care system to operate county public health functions. Implications include the need to incorporate well-defined public health principles in any

  10. Service Availability and Readiness Assessment of Maternal ...

    African Journals Online (AJOL)

    AJRH Managing Editor

    Keywords: Madagascar, Maternal and Child health services, Service availability and readiness assessment, Public health facilities. Résumé ..... Table 2: Percentage of Health Facilities Equipped with Tracer Items for Antenatal Care Services Among Facilities. Providing this ... 32 CSBs, due to its location in a tourist area.

  11. Agreement and Anti-Agreement in Berber: A Multiple-Feature Inheritance Account

    Directory of Open Access Journals (Sweden)

    Saleem Abdelhady

    2017-10-01

    Full Text Available This study proposes understanding Agreement and Anti-Agreement in Berber from Multi-Feature Inheritance (MFI account following Branigan’s (2016 recent approach. The study aims to bridge a misunderstanding in the literature where it has been assumed that Feature Inheritance (FI can only account for Agreement relations while Anti-agreement relations can only be established by a direct Agree between C as a probe and its goal. Under MFI, it can be argued that FI can account for all aspects of Agreement/Anti-agreement. The study, therefore, presents a unification of the three mechanisms proposed by Ouali (2008. The new approach is tested on data from Berber.

  12. Service for maintenance of electrical equipment at the RA reactor, Report for 1977 - Annex III; Prilog III - Rad sluzbe za odrzavanje elektroopreme na reaktoru RA u 1977. godini - Izvestaj

    Energy Technology Data Exchange (ETDEWEB)

    Strezoski, V; Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  13. Services to OP-TI : ASE, CV & EL : are we providing the required services for TI in the LHC era?

    CERN Document Server

    Sollander, P

    2008-01-01

    The technical infrastructure operation, AB/OP/TI, has always been inter-dependent with the TS equipment groups, even since the operators moved from the TCR to the CCC and the AB department. The TI operation team gives a service to the TS department, taking calls from users, monitoring TS equipment through the alarm system and taking an action which may be a combination of work orders, piquet calls and on-site interventions. The TS department in return provides a certain number of services to the Technical Infrastructure operation; the Technical Infrastructure Monitoring (TIM) control system is provided by TS and so are the maintenance management system D7i and the documentation system EDMS. TS equipment groups also supply information concerning planned and on-going work and follow up the work orders created by TI. This paper will describe the services exchanged between TI operation and TS, show the benefits of the collaboration and suggest some improvements.

  14. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  15. Statistical methods for conducting agreement (comparison of clinical tests) and precision (repeatability or reproducibility) studies in optometry and ophthalmology.

    Science.gov (United States)

    McAlinden, Colm; Khadka, Jyoti; Pesudovs, Konrad

    2011-07-01

    The ever-expanding choice of ocular metrology and imaging equipment has driven research into the validity of their measurements. Consequently, studies of the agreement between two instruments or clinical tests have proliferated in the ophthalmic literature. It is important that researchers apply the appropriate statistical tests in agreement studies. Correlation coefficients are hazardous and should be avoided. The 'limits of agreement' method originally proposed by Altman and Bland in 1983 is the statistical procedure of choice. Its step-by-step use and practical considerations in relation to optometry and ophthalmology are detailed in addition to sample size considerations and statistical approaches to precision (repeatability or reproducibility) estimates. Ophthalmic & Physiological Optics © 2011 The College of Optometrists.

  16. Hierarchy of on-orbit servicing interfaces

    Science.gov (United States)

    Moe, Rud V.

    1989-01-01

    A series of equipment interfaces is involved in on-orbit servicing operations. The end-to-end hierarchy of servicing interfaces is presented. The interface concepts presented include structure and handling, and formats for transfer of resources (power, data, fluids, etc.). Consequences on cost, performance, and service ability of the use of standard designs or unique designs with interface adapters are discussed. Implications of the interface designs compatibility with remote servicing using telerobotic servicers are discussed.

  17. Role of support services in Jaduguda mine

    International Nuclear Information System (INIS)

    Roy, Pinaki; Bannerjee, S.N.; Srinivasan, M.N.; Radhakrishnan, V.N.; Khanwalkar, S.D.

    1991-01-01

    This paper highlights the role of the supporting services which are divided into two main groups. Group A consists of services rendered by survey, planning, geology and physics sub-groups. The survey sub-group enforces the directional controls of the various lay-outs, the underground geology sub-group establishes the parameters for the development of drives and stop blocks while the physics section supplies the data regarding grade and thickness and exercises the ore quality control. The techniques evolved in giving these supports to the production system is described. Diamond drilling of holes through rock formation have been successfully used for transporting stowing sand and for draining accumulated water in the levels to respective sumps besides its normal use for underground exploration. Group B consists of engineering services. With limited mining machinery in the early sixties, the mechanical engineering services have taken significant strides for servicing today's equipments consisting of drill jumbos, hydro-pneumatic trackless loaders. Alimak raises climbers, diesel locomotives and mechanised ore transfer systems besides servicing the vital area of modern koepe system of friction winding where Jaduguda has already been a fore-runner in the country. Electrical engineering services basically maintain the electrical systems and equipments both permanent and extensions as mining areas progress in depth. Indigenisation of imported equipments and spares for them and modernisation in certain key areas has been attempted successfully over the years. Civil engineering services are mostly confined to strengthening support system for mine tunnels and construction of ore transfer passes for stopping. (author). 3 figs

  18. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  19. The Petroleum Handling Equipment Research and Development Program of the Department of the Army

    National Research Council Canada - National Science Library

    1956-01-01

    .... The various Technical Services have made very significant progress in the development of improved equipment and techniques for storing, transporting, dispensing and testing fuels and lubricants...

  20. Prioritic directions of inculcation of diagnostic equipment at NPP

    International Nuclear Information System (INIS)

    Morozov, V.I.

    2000-01-01

    The diagnostic provision creates the conditions for increasing the safety and reliability of the NPP functioning, technical service and maintenance by the actual state. With an account of the large number of the NPP equipment elements, limitedness of financial resources, different technical-economical effect from diagnostics determination of the priority directions for introduction of technical diagnostic means into the operational practice is one of the main factors. The method for determining the above-mentioned priorities is proposed. The main aspects of the method and mathematical models, based on the logical-probabilistic modeling, are presented. The essence of the method consists in ranging the technical-economical effect from introduction of various factors of the diagnostic equipment [ru

  1. Challenges of equipment qualification using today's standards with emphasis on a class 1E motor program

    International Nuclear Information System (INIS)

    Deaton, K.

    1995-01-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed

  2. The Text of the Safeguards Agreement of 18 March 1976 between the Agency, France and Pakistan

    International Nuclear Information System (INIS)

    1976-01-01

    The text of the Agreement of 18 March 1976 between the Agency, France and Pakistan for the application of safeguards with respect to a fuel reprocessing plant and to nuclear material, facilities, equipment and relevant technological information supplied by France to Pakistan for the development of peaceful uses of nuclear energy is reproduced in this document for the information of all Members

  3. The Text of the Safeguards Agreement of 18 March 1976 between the Agency, France and Pakistan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-06-22

    The text of the Agreement of 18 March 1976 between the Agency, France and Pakistan for the application of safeguards with respect to a fuel reprocessing plant and to nuclear material, facilities, equipment and relevant technological information supplied by France to Pakistan for the development of peaceful uses of nuclear energy is reproduced in this document for the information of all Members.

  4. Dry Ice Blast Decontamination to in-service equipment in Japanese PWR plant

    International Nuclear Information System (INIS)

    2016-01-01

    MHI had developed several mechanical decontamination methods. Mechanical decontamination is beneficial when it is applied to equipment whose surface is narrow. Especially in terms of secondary waste reduction, MHI started the study of application of Dry Ice Blast Decontamination to actual PWR plant. This paper provides an introduction to Dry Ice Blast Decontamination principle, its system and actual application result to PWR plant. (J.P.N.)

  5. Analysis of NPP pipes and equipment damage in life time prolongation

    International Nuclear Information System (INIS)

    Tkachev, V.V.; Zheltukhin, K.K.

    2008-01-01

    Paper describes a procedure to calculate the probability of pipes and equipment failure taking account of both the service records of the structures under various conditions and their aging. The parameters characterizing applied loads, failures, as well as metal strength, mechanical and thermal properties serve as the arbitrary values used in the described procedure. Paper presents an example of the probability calculation of failure of the RBMK emergency feed pump recirculation pipes when their service life is prolonged [ru

  6. Miami urban partnership agreement (UPA) Pines Boulevard transit signal priority evaluation .report.

    Science.gov (United States)

    2011-09-01

    The Miami Urban Partnership Agreement included the conversion of high occupancy vehicle (HOV) lanes on I-95 to high occupancy toll : (HOT) lanes and additional express bus service. It also included funding for the installation of transit signal prior...

  7. Predicting the residual life of plant equipment - Why worry

    International Nuclear Information System (INIS)

    Jaske, C.E.

    1985-01-01

    Predicting the residual life of plant equipment that has been in service for 20 to 30 years or more is a major concern of many industries. This paper reviews the reasons for increased concern for residual-life assessment and the general procedures used in performing such assessments. Some examples and case histories illustrating procedures for assessing remaining service life are discussed. Areas where developments are needed to improve the technology for remaining-life estimation are pointed out. Then, some of the critical issues involved in residual-life assessment are identified. Finally, the future role of residual-life prediction is addressed

  8. Development of an approach to facilitate optimal equipment replacement : technical summary.

    Science.gov (United States)

    1999-10-01

    The objective of the study was to determine a way or ways to assign an urgency rating to equipment that was currently in service but in need of replacement. This urgency rating must in some manner took into account the various costs associated with r...

  9. 9 CFR 318.305 - Equipment and procedures for heat processing systems.

    Science.gov (United States)

    2010-01-01

    ... processing systems. 318.305 Section 318.305 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION... PREPARATION OF PRODUCTS Canning and Canned Products § 318.305 Equipment and procedures for heat processing...

  10. Mission Analysis for Using Preventive Radiological/Nuclear Detection Equipment for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, Brooke R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wood-Zika, Annmarie R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Haynes, Daniel [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Klemic, Gladys A. [US Dept. of Homeland Security National Urban Security Technology Lab., Manhattan, NY (United States); Musolino, Stephen V. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection (PRND) equipment to provide state and local agencies with scientific guidance on how to effectively use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed by technology manufacturers and purchased by responders for preventive detection and source interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management (CM) response take place, as it is currently the most widely available and fielded radiological instrumentation by state and local agencies. This effort will provide scientific guidance on the most effective way to utilize this class of equipment for consequence management missions. Gaining a better understanding of how PRND equipment can operate and perform for these missions will allow for recommendations on the tactical approach responders can use for consequence management operations. PRND equipment has been placed into service by federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be leveraged to support the emergency response in the aftermath of a radiological or nuclear event. With several hundred makes and models of PRND equipment, often with significantly different detection capabilities that do not align with their nominal PRND equipment type, development of a streamlined categorization scheme with respect to consequence management missions was the first step to identifying safe and effective uses of PRND equipment for radiological/nuclear incident response.

  11. Current Commitments under the GATS in Educational Services. Background Document.

    Science.gov (United States)

    Organisation for Economic Cooperation and Development, Paris (France). Centre for Educational Research and Innovation.

    The GATS is a multilateral, legally enforceable agreement among members of the World Trade Organization (WTO) that regulates international trade services. Rules regulating internationally traded educational services, which include various types of exchange programs, are part of the agreement. Among the 42 member countries that have made…

  12. Prediction degradation trend of nuclear equipment based on GM (1, 1)-Markov chain

    International Nuclear Information System (INIS)

    Zhang Liming; Zhao Xinwen; Cai Qi; Wu Guangjiang

    2010-01-01

    The degradation trend prediction results are important references for nuclear equipment in-service inspection and maintenance plan. But it is difficult to predict the nuclear equipment degradation trend accurately by the traditional statistical probability due to the small samples, lack of degradation data and the wavy degradation locus. Therefore, a method of equipment degradation trend prediction based on GM (1, l)-Markov chain was proposed in this paper. The method which makes use of the advantages of both GM (1, 1) method and Markov chain could improve the prediction precision of nuclear equipment degradation trend. The paper collected degradation data as samples and accurately predicted the degradation trend of canned motor pump. Compared with the prediction results by GM (1, 1) method, the prediction precision by GM (1, l)-Markov chain is more accurate. (authors)

  13. Investigating factors that influence level and dynamics of capital productivity in plants manufacturing equipment for mines

    Energy Technology Data Exchange (ETDEWEB)

    Karenov, R.S. (Karagandinskii Politekhnicheskii Institut (USSR))

    1990-10-01

    Analyzes productivity of capital in plants manufacturing equipment for underground coal mining in the USSR. Effects of the following factors are evaluated: working time, investment, mechanization of manufacturing processes, power of motors used to drive the manufacturing equipment, duration of a manufacturing cycle, cooperation degree, equipment service life. Effects of insufficient specialization of manufacturing plants and the manufacturing of mining equipment by repair shops of individual mines which should rather specialize in equipment repair and maintenance are evaluated. Analysis shows that specialization of the manufacturing plants could increase productivity of capital by 1.5-2.0 times, reduce labor consumption by 3-5 times and consumption of materials by 1.5-1.7 times. 4 refs.

  14. Tool for the verification of geometrical parameters and constancy of image quality in radiology equipment

    International Nuclear Information System (INIS)

    Mayo, P.; Verdu Martin, G.; Rodenas Escriba, F.; Marin Peinado, B.; Camapyo Esteban Nogueira, J. M.; Diez Domingo, S.; Villaescusa Blanca, J. I.; Hernando Gonzalez, I.; Ruiz Manzano, P.; Rivas Ballarin, M. A.; Melcho Iniguez, M.; Asensio Martinez, M. I.

    2013-01-01

    This paper presents the application of an innovative tool developed for the detailed quality control of diagnostic equipment. We have tried to validate such a tool for verification of geometrical parameters and the evaluation of the constancy of the image quality in radiology equipment, evaluating their usefulness by various services of Radio physics and radiation protection of different hospitals. (Author)

  15. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  16. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  17. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  18. Excavating and loading equipment for peat mining

    Science.gov (United States)

    Mikhailov, A. V.; Zhigulskaya, A. I.; Yakonovskaya, T. B.

    2017-10-01

    Recently, the issues of sustainable development of Russian regions, related to ensuring energy security, are more urgent than ever. To achieve sustainable development, an integrated approach to the use of local natural resources is needed. Practically in all north regions of the Russian Federation, peat as a local natural resource is widespread, which has a practical application in the area of housing services. The paper presents the evaluation of technologies for open-pit peat mining, as well as analysis of technological equipment for peat production. Special attention is paid to a question of peat materials excavating and loading. The problem of equipment selection in a peat surface mine is complex. Many features, restrictions and criteria need to be considered. Use of low and ultra-low ground pressure excavators and low ground pressure front-end loaders with full-range tires to provide the necessary floatation in the peat bog environment is offered.

  19. 12 CFR 533.5 - Related agreements considered a single agreement.

    Science.gov (United States)

    2010-01-01

    ... DISCLOSURE AND REPORTING OF CRA-RELATED AGREEMENTS § 533.5 Related agreements considered a single agreement... entered into within the same 12-month period; and (3) Are each in fulfillment of the CRA. (b... in fulfillment of the CRA, if the contracts were negotiated in a coordinated fashion and a NGEP is a...

  20. 12 CFR 35.5 - Related agreements considered a single agreement.

    Science.gov (United States)

    2010-01-01

    ... DISCLOSURE AND REPORTING OF CRA-RELATED AGREEMENTS § 35.5 Related agreements considered a single agreement... into within the same 12-month period; and (3) Are each in fulfillment of the CRA. (b) Substantively... the CRA, if the contracts were negotiated in a coordinated fashion and a NGEP is a party to each...

  1. Modularization of Industrial Service Processes

    DEFF Research Database (Denmark)

    Frandsen, Thomas; Hsuan, Juliana

    In this paper we examine how complex service processes can be dealt with through the lenses of modularization strategies. Through an illustrative case study of a manufacturer of industrial equipment for process industries we propose the use of the service modularity function to conceptualize...... and assess the service modularity of service offerings. The measured degree of modularity would allow us to sharpen our understanding of modularity in the context of industrial services, such as the role of standardization and component reuse on architecture flexibility. It would also provide a foundation...

  2. Lack of security of networked medical equipment in radiology.

    Science.gov (United States)

    Moses, Vinu; Korah, Ipeson

    2015-02-01

    OBJECTIVE. There are few articles in the literature describing the security and safety aspects of networked medical equipment in radiology departments. Most radiologists are unaware of the security issues. We review the security of the networked medical equipment of a typical radiology department. MATERIALS AND METHODS. All networked medical equipment in a radiology department was scanned for vulnerabilities with a port scanner and a network vulnerability scanner, and the vulnerabilities were classified using the Common Vulnerability Scoring System. A network sniffer was used to capture and analyze traffic on the radiology network for exposure of confidential patient data. We reviewed the use of antivirus software and firewalls on the networked medical equipment. USB ports and CD and DVD drives in the networked medical equipment were tested to see whether they allowed unauthorized access. Implementation of the virtual private network (VPN) that vendors use to access the radiology network was reviewed. RESULTS. Most of the networked medical equipment in our radiology department used vulnerable software with open ports and services. Of the 144 items scanned, 64 (44%) had at least one critical vulnerability, and 119 (83%) had at least one high-risk vulnerability. Most equipment did not encrypt traffic and allowed capture of confidential patient data. Of the 144 items scanned, two (1%) used antivirus software and three (2%) had a firewall enabled. The USB ports were not secure on 49 of the 58 (84%) items with USB ports, and the CD or DVD drive was not secure on 17 of the 31 (55%) items with a CD or DVD drive. One of three vendors had an insecure implementation of VPN access. CONCLUSION. Radiologists and the medical industry need to urgently review and rectify the security issues in existing networked medical equipment. We hope that the results of our study and this article also raise awareness among radiologists about the security issues of networked medical equipment.

  3. The influence of experiential learning on medical equipment adoption in general practices.

    Science.gov (United States)

    Bourke, Jane; Roper, Stephen

    2014-10-01

    The benefits of the availability and use of medical equipment for medical outcomes are understood by physicians and policymakers alike. However, there is limited understanding of the decision-making processes involved in adopting and using new technologies in health care organisations. Our study focuses on the adoption of medical equipment in Irish general practices which are marked by considerable autonomy in terms of commercial practice and the range of medical services they provide. We examine the adoption of six items of medical equipment taking into account commercial, informational and experiential stimuli. Our analysis is based on primary survey data collected from a sample of 601 general practices in Ireland on practice characteristics and medical equipment use. We use a multivariate Probit to identify commonalities in the determinants of the adoption. Many factors, such as GP and practice characteristics, influence medical equipment adoption. In addition, we find significant and consistent evidence of the influence of learning-by-using effects on the adoption of medical equipment in a general practice setting. Knowledge generated by experiential or applied learning can have commercial, organisational and health care provision benefits in small health care organisations. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  4. Containment Response Analysis for Equipment Qualification of Kori Nuclear Power Plant Unit 3 and 4

    Energy Technology Data Exchange (ETDEWEB)

    Byun, Choong Sup; Song, Dong Soo; Hwang, Yong Jun [Korea Electric Power Research Institute, Taejon (Korea, Republic of); Seo, Kwi Hyun; Song, Wan Jung [ENERGEO Inc., Sungnam (Korea, Republic of)

    2006-07-01

    Equipment that is used to perform a necessary safety function must be capable of maintaining functional operability under all service condition postulated to occur during the installed life for the time it is required. The pressure and temperature analyses for loss of coolant accident and main steam line break accident provide the bounding test envelope inside containment for the operability evaluation of safety equipment in harsh environmental. This paper describes the results of the containment pressure and temperature analysis for the equipment qualification (EQ) envelopes of Kori unit 3 and 4.

  5. 75 FR 52716 - Transfer of Land to Forest Service

    Science.gov (United States)

    2010-08-27

    ... DEPARTMENT OF AGRICULTURE Forest Service Transfer of Land to Forest Service AGENCY: Forest Service... Forest Service, U.S. Department of Agriculture, respectively signed a land transfer agreement... from the Farm Service Agency to the Forest Service. This administrative transfer is authorized by...

  6. Manual on Safety Aspects of the Design and Equipment of Hot Laboratories

    International Nuclear Information System (INIS)

    1969-01-01

    With the development of atomic energy application and research, hot laboratories are now being constructed in a number of countries. The present publication describes and discusses experience in several countries in designing equipment for these laboratories. The safe handling of highly radioactive substances is the main purpose of hot laboratory design and equipment. The manual aims at helping those persons, particularly in the developing countries, who plan to design and construct a new hot laboratory or modify an existing one. It does not deal in great detail with the engineering design of protective and handling equipment; these matters can be found in the comprehensive list of references. The manual itself covers only basic ideas and different approaches in the design of laboratory building, hot cells, shielded and glove boxes, fume cupboards, and handling and viewing equipment. Systems for transferring materials and main services are also discussed.

  7. 26 CFR 1.1241-1 - Cancellation of lease or distributor's agreement.

    Science.gov (United States)

    2010-04-01

    ... marketing or marketing and servicing of goods. It does not apply to agreements for selling intangible... his State. The marketing is accomplished by using the warehouse and trucks acquired before he entered... distributes to frozen-food freezer and locker customers. The terms of his distributorship do not make it...

  8. Order No. 217 of 29 April 1977 on X-ray diagnostic equipment for medical use

    International Nuclear Information System (INIS)

    1978-01-01

    This Order was made by the National Health Service and is divided into several parts covering inter alia approval and notification of X-ray installations, conditions of liability, occupational radiation protection, construction of X-ray apparatus and its shielding and inspection of such equipment by the National Health Service. (NEA) [fr

  9. 9 CFR 381.305 - Equipment and procedures for heat processing systems.

    Science.gov (United States)

    2010-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Canning and Canned... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Equipment and procedures for heat processing systems. 381.305 Section 381.305 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE...

  10. Interference by new-generation mobile phones on critical care medical equipment

    NARCIS (Netherlands)

    van Lieshout, Erik Jan; van der Veer, Sabine N.; Hensbroek, Reinout; Korevaar, Johanna C.; Vroom, Margreeth B.; Schultz, Marcus J.

    2007-01-01

    INTRODUCTION: The aim of the study was to assess and classify incidents of electromagnetic interference (EMI) by second-generation and third-generation mobile phones on critical care medical equipment. METHODS: EMI was assessed with two General Packet Radio Service (GPRS) signals (900 MHz, 2 W, two

  11. Blue Collar & Beyond: Resumes for Skilled Trades & Services.

    Science.gov (United States)

    Parker, Yana

    This book, which is designed for individuals in skilled trades and service occupations, contains 132 sample resumes for occupations in the following occupational categories: automotive and heavy equipment; construction and maintenance; customer service; hotel, restaurant, and food service; office; trades; warehouse, manufacturing, and electronics;…

  12. 7 CFR 54.1014 - Accessibility of equipment and utensils; access to establishments.

    Science.gov (United States)

    2010-01-01

    ...) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS..., Processing, and Packaging of Livestock and Poultry Products § 54.1014 Accessibility of equipment and utensils...

  13. Activity of the Service for maintenance of RA reactor electrical equipment in 1976, report - Annex III; Prilog III - Rad sluzbe za odrzavanje elektro opreme reaktora RA u 1976. godini - Izvestaj -

    Energy Technology Data Exchange (ETDEWEB)

    Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  14. Activity of the Service for maintenance of RA reactor electrical equipment in 1978, report - Annex III; Prilog III - Rad sluzbe za odrzavanje elektro opreme reaktora RA u 1978. godini - Izvestaj -

    Energy Technology Data Exchange (ETDEWEB)

    Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  15. A search engine for the engineering and equipment data management system (EDMS) at CERN

    International Nuclear Information System (INIS)

    Tsyganov, A; Amerigo, S M; Petit, S; Pettersson, T; Suwalska, A

    2008-01-01

    CERN, the European Laboratory for Particle Physics, located in Geneva -Switzerland, is currently building the LHC (Large Hadron Collider), a 27 km particle accelerator. The equipment life-cycle management of this project is provided by the Engineering and Equipment Data Management System (EDMS) Service. Using an Oracle database, it supports the management and follow-up of different kinds of documentation through the whole life cycle of the LHC project: design, manufacturing, installation, commissioning data etc... The equipment data collection phase is now slowing down and the project is getting closer to the 'As-Built' phase: the phase of the project consuming and exploring the large volumes of data stored since 1996. Searching through millions of items of information (documents, equipment parts, operations...) multiplied by dozens of points of view (operators, maintainers...) requires an efficient and flexible search engine. This paper describes the process followed by the team to implement the search engine for the LHC As-built project in the EDMS Service. The emphasis is put on the design decision to decouple the search engine from any user interface, potentially enabling other systems to also use it. Projections, algorithms, and the planned implementation are described in this paper. The implementation of the first version started in early 2007

  16. International Thermonuclear Experimental Reactor (ITER) plant layout and site services

    International Nuclear Information System (INIS)

    Chuyanov, V.

    2001-01-01

    The ITER site has not been determined at this time. Nevertheless, to develop a construction plan and a cost estimate, it is necessary to have a detailed layout of the buildings, structures, and outdoor equipment integrated with the balance of plant service systems prototypical of large fusion power plants. These services include electric power for magnet feeds and plasma heating systems, cryogenic and conventional cooling systems, compressed air, gas supplies, de-mineralized water, steam, and drainage. Nuclear grade facilities are provided to handle tritium fuel and activated waste, as well as to prevent radioactive exposure of either the workers or the public. To avoid interference between services of different types and for efficient arrangement of buildings, structures, and equipment within the site area, a plan was developed which segregated different classes of services to four quadrants surrounding the tokamak building, placed at the approximate geographic center of the site. Location of the twenty-seven buildings on the generic site was selected to meet all design requirements at minimum total project cost. A similar approach has been used to determine the location of services above, at, and below grade. The generic site plan can be adapted to the site selected for ITER without significant changes to the buildings or equipment. Some rearrangements may be required by site topography resulting primarily in changes to the length of services that link the buildings and equipment. (author)

  17. International Thermonuclear Experimental Reactor (ITER) plant layout and site services

    International Nuclear Information System (INIS)

    Chuyanov, V.

    1999-01-01

    The ITER site has not been determined at this time. Nevertheless, to develop a construction plan and a cost estimate, it is necessary to have a detailed layout of the buildings, structures, and outdoor equipment integrated with the balance of plant service systems prototypical of large fusion power plants. These services include electric power for magnet feeds and plasma heating systems, cryogenic and conventional cooling systems, compressed air, gas supplies, de-mineralized water, steam, and drainage. Nuclear grade facilities are provided to handle tritium fuel and activated waste, as well as to prevent radioactive exposure of either the workers or the public. To avoid interference between services of different types and for efficient arrangement of buildings, structures, and equipment within the site area, a plan was developed which segregated different classes of services to four quadrants surrounding the tokamak building, placed at the approximate geographic center of the site. Location of the twenty-seven buildings on the generic site was selected to meet all design requirements at minimum total project cost. A similar approach has been used to determine the location of services above, at, and below grade. The generic site plan can be adapted to the site selected for ITER without significant changes to the buildings or equipment. Some rearrangements may be required by site topography resulting primarily in changes to the length of services that link the buildings and equipment. (author)

  18. Achieving high value care for all and the perverse incentives of 340B price agreements.

    Science.gov (United States)

    Whittington, Melanie D; Campbell, Jonathan D; McQueen, R Brett

    2018-04-01

    Section 340B of the Public Health Service Act requires drug manufacturers to enter into price agreements with the Department of Health and Human Services. These agreements result in variation in the price paid to acquire a drug by sector, which complicates the price used in cost-effectiveness analyses. We describe the transactions and sectors in a 340B agreement using a multiple sclerosis drug. Cost-effectiveness estimates were calculated for the drug using drug prices from the manufacturer and payer perspective. We found the amount paid to the manufacturer (340B price) was a good value ($118,256 per quality-adjusted life-year); however, from the payer drug cost perspective, good value ($196,683 per quality-adjusted life-year) was not achieved. Given that emerging value frameworks incorporate cost-effectiveness, these price variations may have downstream negative consequences, including inaccurate coverage and reimbursement policy recommendations. Upcoming policy changes to the 340B program should incentivize pricing schemes hinged on transparency and value.

  19. EXPERIENCE IN DEVELOPMENT MEDICAL KITS FOR MEDICAL SERVICES OF THE RUSSIAN FEDERATION ARMED FORCES

    Directory of Open Access Journals (Sweden)

    E. O. Rodionov

    2016-01-01

    Full Text Available Introduction. The development of modern, complete-standard issue equipment for the Armed Forces Medical Service is an urgent organizational and management task. First aid kits, medical bags, sets of medical equipment, medical kits and packing existed until recently; no longer meet modern requirements for a number of objective reasons. The aim of the study was the formation of programs of development of modern samples of complete-standard-issue equipment. Materials and methods. The study was conducted based on the analysis of scientific literature and guidelines which regulate different aspects of the Armed Forces Medical Service complete-standard issue equipment. The study used methods like: retrospective, content analysis, comparison and description, logical, structural and functional analysis, expert assessments, decision-making, as well as the methods of the theory of constraints and other systems. Results and discussion. rmation of the range of medical property in modern conditions for inclusion into complete-standard issue equipment is connected with the need to make timely decisions on choosing the most efficient models, taking into account market conditions and economic opportunities. There are requirements established for the complete-samples standard issue equipment for their use outside a medical organization. Development program structure of complete-standard-issue equipment is shown, as well as examples of the formation of the content of medical equipment kits. On the basis of the offered program a new complete-standard issue equipment of the Armed Forces Medical Service was created. In accordance with the principles of the theory of constraints a strategy to optimize the composition of sets of medical equipment was developed. It included comprehensive solutions aimed at stabilizing the activity of the pharmaceutical industry in the interest of the Armed Forces Medical Service. Conclusions. An offered program has allowed developing

  20. The Tanzania experience: clinical laboratory testing harmonization and equipment standardization at different levels of a tiered health laboratory system.

    Science.gov (United States)

    Massambu, Charles; Mwangi, Christina

    2009-06-01

    The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.