WorldWideScience

Sample records for equipment selection mpes

  1. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  2. pMPES: A Modular Peptide Expression System for the Delivery of Antimicrobial Peptides to the Site of Gastrointestinal Infections Using Probiotics

    Directory of Open Access Journals (Sweden)

    Kathryn Geldart

    2016-10-01

    Full Text Available Antimicrobial peptides are a promising alternative to traditional antibiotics, but their utility is limited by high production costs and poor bioavailability profiles. Bacterial production and delivery of antimicrobial peptides (AMPs directly at the site of infection may offer a path for effective therapeutic application. In this study, we have developed a vector that can be used for the production and secretion of seven antimicrobial peptides from both Escherichia coli MC1061 F’ and probiotic E.coli Nissle 1917. The vector pMPES (Modular Peptide Expression System employs the Microcin V (MccV secretion system and a powerful synthetic promoter to drive AMP production. Herein, we demonstrate the capacity of pMPES to produce inhibitory levels of MccV, Microcin L (MccL, Microcin N (McnN, Enterocin A (EntA, Enterocin P (EntP, Hiracin JM79 (HirJM79 and Enterocin B (EntB. To our knowledge, this is the first demonstration of such a broadly-applicable secretion system for AMP production. This type of modular expression system could expedite the development of sorely needed antimicrobial technologies

  3. Sistema de Informação Virtual para Apoio à Gestão de Mpes - Micro e Pequenas Empresas

    Directory of Open Access Journals (Sweden)

    João Luiz Franco

    2015-01-01

    Full Text Available Considerando as necessidades de MPEs (Micro e Pequenas Empresas registradas pela literatura e por organismos de apoio, em especial a Incubadora de Empresas de Araraquara, a investigação que deu suporte ao presente trabalho pretende levantar necessidades de gerenciamento de informação em empresas selecionadas no município de Araraquara e desenvolver um sistema de informação para apoiar a gestão dessas empresas, aplicável nas demais de mesmo porte. O sistema deverá ser instalado em um servidor (que poderá ser administrado pela Uniara ou por instituição com quem estabeleça parceria e poderá ser utilizado em qualquer computador acessando a Internet, de forma que não sejam necessários grandes investimentos em tecnologia para que as empresas possam usufruir dele. O presente trabalho: a caracteriza a relevância de informatização para as MPEs e as dificuldades de acesso à tecnologia de informação; b apresenta o desenvolvimento de sistema de gestão para micro empresas; c propõe investigação junto à incubadora de empresas de Araraquara-SP, visando à avaliação, por parte das empresas, do sistema proposto.

  4. Proceedings of the 18. international symposium on mine planning and equipment selection (MPES 2009) and the 11. international symposium on environmental issues and waste management in energy and mineral production (SWEMP 2009) : mine planning and equipment selection and environmental issues and waste management in energy and mineral production

    International Nuclear Information System (INIS)

    Singhal, R.K.; Mehrotra, A.; Fytas, K.; Ge, H.

    2009-01-01

    This conference focused on the application of innovative technologies to the mineral industries and the development of productive methods for the mining and processing industries. It was attended by participants from North and South America, Europe, Australia, Africa and Asia with backgrounds in computer sciences, mining engineering and research in mineral production. The major topics addressed regarding mine planning and equipment selection included economic and technical feasibility studies; reserve estimation; mine development; design and planning of surface and underground mines; drilling, blasting, tunneling and excavation engineering; mining equipment selection; automation and information technology; maintenance and production management for mines and mining systems; mining in terms of health, safety and the environment; and rock mechanics and geotechnical applications. The topics addressed regarding waste management in energy and mineral production included the environmental impacts of coal-fired power projects; mining and reclamation; water management; social aspects of rehabilitation; sustainable development for mineral and energy industries; remediation of contaminated soil and groundwater; health hazard and safety issues in small-scale mining; environmental issues in surface and underground mining of metalliferous, coal, uranium and industrial minerals; occupational health and safety; control of effluents from mineral processing, metallurgy and chemical plants; emerging technologies for environmental protection; reliability of waste containment structures; and tailings treatment, recycling and disposal. The conference featured 162 presentations, of which 30 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  5. Materials Selection And Fabrication Practices For Food Processing Equipment Manufacturers In Uganda

    Directory of Open Access Journals (Sweden)

    John Baptist Kirabira

    2017-08-01

    Full Text Available The food processing industry is one of the fast-growing sub-sectors in Uganda. The industry which is majorly composed of medium and small scale firms depends on the locally developed food processing equipment. Due to lack of effective materials selection practices employed by the equipment manufacturers the materials normally selected for most designs are not the most appropriate ones hence compromising the quality of the equipment produced. This has not only led to poor quality food products due to contamination but could also turn out health hazardous to the consumers of the food products. This study involved the assessment of the current materials selection and fabrication procedures used by the food processing equipment manufacturers with a view of devising best practices that can be used to improve the quality of the food products processed by the locally fabricated equipment. Results of the study show that designers experience biasness and desire to minimize cost compromise the materials selection procedure. In addition to failing to choose the best material for a given application most equipment manufacturers are commonly fabricating equipment with inadequate surface finish and improper weldments. This hinders the equipments ability to meet food hygiene standards.

  6. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  7. A multi-criteria decision making approach for the selection of a flexible packaging equipment

    Directory of Open Access Journals (Sweden)

    Cristea Ciprian

    2017-01-01

    Full Text Available Flexible packaging is one of the fastest growing segments of the packaging industry, combining paper, plastic film and aluminum foil to deliver a broad array of products for food and beverage, personal care products, and pharmaceutical industries. In order to preserve the quality and safety of the product contained in them, there are currently a variety of flexible packaging equipment options available. However their relative costs and performance differ. This study proposes an application of a ranking methodology to assess a selection of the most suitable flexible packaging equipment. The adequate criteria in the selection of equipment have been identified, and the considered options are assessed, considering the decision maker’s preferences and existing constraints. The options are ranked in terms of their suitability for selecting equipment by using the Electre III method. The results obtained from the simulation experiment highlight the effectiveness of the model in outranking different options in the process of equipment selection.

  8. Modelling the factors influencing the selection of the construction equipment for Indian construction organizations

    Directory of Open Access Journals (Sweden)

    S.V.S. Raja Prasad

    2016-09-01

    Full Text Available The contribution of Indian construction sector to the GDP is approximately 10%. Under new government policy, it is anticipated that $1000 Billion share for exclusively infrastructure segment would be completed within the next few years. Construction sector in developing country like India still depends on labor and the practice of mechanization, adopting to use of versatile construction equipment is not in force. The need for implementing new technologies and automation is essential to improve the quality, safety and efficiency. To meet the challenges ahead the construction, organizations should focus on utilization of machinery/equipment to achieve desirable results. Modern construction is characterized by the increase in utilization of equipment to accomplish numerous construction activities. The selection of construction equipment often affects the required amount of time and effort. It is therefore important for managements of construction organizations and planners to be familiar with the features of various types of equipment commonly used in construction activities. The selection of appropriate equipment is a crucial decision making process as it involves huge capital investment. The purpose of the present study is to develop a model pertaining to the factors influencing the selection of construction equipment by using interpretive structural modelling and the results indicate that productivity and safety are the important factors in selection of equipment in Indian construction organizations.

  9. Equipment Selection by using Fuzzy TOPSIS Method

    Science.gov (United States)

    Yavuz, Mahmut

    2016-10-01

    In this study, Fuzzy TOPSIS method was performed for the selection of open pit truck and the optimal solution of the problem was investigated. Data from Turkish Coal Enterprises was used in the application of the method. This paper explains the Fuzzy TOPSIS approaches with group decision-making application in an open pit coal mine in Turkey. An algorithm of the multi-person multi-criteria decision making with fuzzy set approach was applied an equipment selection problem. It was found that Fuzzy TOPSIS with a group decision making is a method that may help decision-makers in solving different decision-making problems in mining.

  10. Supplier selection based on improved MOGA and its application in nuclear power equipment procurement

    International Nuclear Information System (INIS)

    Yan Zhaojun; Wang Dezhong; Zhou Lei

    2007-01-01

    Considering the fact that there are few objective and available methods supporting the supplier selection in nuclear power equipment purchasing process, a supplier selection method based on improved multi-objective genetic algorithm (MOGA) is proposed. The simulation results demonstrate the effectiveness and efficiency of this method for the supplier selection in nuclear power equipment procurement process. (authors)

  11. Selection of equipment for safe shutdown in the event of earthquake

    International Nuclear Information System (INIS)

    Romano Gomez, J.; Perez Alcaniz, T.; Esteban Barriendos, M.

    1993-01-01

    This paper presents the work carried out at the Almaraz Nuclear Power Plant for selecting equipment that contributes to reactor safe shutdown in the event of earthquake. The objective was to comply with the requirements defined by the US NRC in Generic Letter 87-02, 'Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors'. The analysis framework and the method applied followed the generic procedures prepared by the Seismic Qualification Utility Group of which Almaraz NPP is a member, along with other Spanish power plants. The equipment selected shall be subjected to the Application Programme of the above-mentioned Generic Letter. The aim has been to cover the objectives of the programme and, at the same time, to ensure compatibility with plant operating procedures. (author)

  12. Teaching animal habitat selection using wildlife tracking equipment

    Science.gov (United States)

    Laskowski, Jessica; Gillespie, Caitlyn R.; Corral, Lucia; Oden, Amy; Fricke, Kent A.; Fontaine, Joseph J.

    2016-01-01

    We present a hands-on outdoor activity coupled with classroom discussion to teach students about wildlife habitat selection, the process by which animals choose where to live. By selecting locations or habitats with many benefits (e.g., food, shelter, mates) and few costs (e.g., predators), animals improve their ability to survive and reproduce. Biologists track animal movement using radio telemetry technology to study habitat selection so they can better provide species with habitats that promote population growth. We present a curriculum in which students locate “animals” (transmitters) using radio telemetry equipment and apply math skills (use of fractions and percentages) to assess their “animal's” habitat selection by comparing the availability of habitat types with the proportion of “animals” they find in each habitat type.

  13. The procedure of selecting the best construction equipment by the set of its quantitative characteristics

    Directory of Open Access Journals (Sweden)

    Romanov Petr

    2017-01-01

    Full Text Available Today’s construction projects are highly mechanized. That#x2019;s why selection of right equipment has always been a key factor in the success of any construction project. This decision is typically made by comparison of equipment feature, productivity, capacity and cost. The article describes the approach to selecting the best set of construction equipment from the available options by the set of its quantitative characteristics. It is proposed to carry out the evaluation of options and selection of the best option based on the method of spectral analysis. The article presents the results of the selection of the most appropriate floor screed conveyor for purchasing by construction company using the specified method.

  14. Clothing, equipment and devices for personnel protection: Its selection according to occupational risks

    International Nuclear Information System (INIS)

    1989-01-01

    This Venezuelan standard establishes the selection of the type of clothing, equipment and devices for personnel protection, to be used by workers according to the occupational risk they deal with, in order to avoid or to reduce the factors that can, directly or indirectly, affect their physical integrity. For the risks not contemplated in this norm, the selection of the type of clothing, equipment and devices for personnel protection, must be done following the corresponding international standard [es

  15. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  16. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  17. Factors influencing equipment selection in electron beam processing

    Science.gov (United States)

    Barnard, J. W.

    2003-08-01

    During the eighties and nineties accelerator manufacturers dramatically increased the beam power available for high-energy equipment. This effort was directed primarily at meeting the demands of the sterilization industry. During this era, the perception that bigger (higher power, higher energy) was always better prevailed since the operating and capital costs of accelerators did not increase with power and energy as fast as the throughput. High power was needed to maintain per unit costs low for treatment. This philosophy runs counter to certain present-day realities of the sterilization business as well as conditions influencing accelerator selection in other electron beam applications. Recent experience in machine selection is described and factors affecting choice are presented.

  18. Culture and Drug Profiling of Patient Derived Malignant Pleural Effusions for Personalized Cancer Medicine.

    Science.gov (United States)

    Ruiz, Christian; Kustermann, Stefan; Pietilae, Elina; Vlajnic, Tatjana; Baschiera, Betty; Arabi, Leila; Lorber, Thomas; Oeggerli, Martin; Savic, Spasenija; Obermann, Ellen; Singer, Thomas; Rothschild, Sacha I; Zippelius, Alfred; Roth, Adrian B; Bubendorf, Lukas

    2016-01-01

    The use of patients' own cancer cells for in vitro selection of the most promising treatment is an attractive concept in personalized medicine. Human carcinoma cells from malignant pleural effusions (MPEs) are suited for this purpose since they have already adapted to the liquid environment in the patient and do not depend on a stromal cell compartment. Aim of this study was to develop a systematic approach for the in-vitro culture of MPEs to analyze the effect of chemotherapeutic as well as targeted drugs. MPEs from patients with solid tumors were selected for this study. After morphological and molecular characterization, they were cultured in medium supplemented with patient-derived sterile-filtered effusion supernatant. Growth characteristics were monitored in real-time using the xCELLigence system. MPEs were treated with a targeted therapeutic (erlotinib) according to the mutational status or chemotherapeutics based on the recommendation of the oncologists. We have established a robust system for the ex-vivo culture of MPEs and the application of drug tests in-vitro. The use of an antibody based magnetic cell separation system for epithelial cells before culture allowed treatment of effusions with only moderate tumor cell proportion. Experiments using drugs and drug-combinations revealed dose-dependent and specific growth inhibitory effects of targeted drugs. We developed a new approach for the ex-vivo culture of MPEs and the application of drug tests in-vitro using real-time measuring of cell growth, which precisely reproduced the effect of clinically established treatments by standard chemotherapy and targeted drugs. This sets the stage for future studies testing agents against specific targets from genomic profiling of metastatic tumor cells and multiple drug-combinations in a personalized manner.

  19. Culture and Drug Profiling of Patient Derived Malignant Pleural Effusions for Personalized Cancer Medicine.

    Directory of Open Access Journals (Sweden)

    Christian Ruiz

    Full Text Available The use of patients' own cancer cells for in vitro selection of the most promising treatment is an attractive concept in personalized medicine. Human carcinoma cells from malignant pleural effusions (MPEs are suited for this purpose since they have already adapted to the liquid environment in the patient and do not depend on a stromal cell compartment. Aim of this study was to develop a systematic approach for the in-vitro culture of MPEs to analyze the effect of chemotherapeutic as well as targeted drugs.MPEs from patients with solid tumors were selected for this study. After morphological and molecular characterization, they were cultured in medium supplemented with patient-derived sterile-filtered effusion supernatant. Growth characteristics were monitored in real-time using the xCELLigence system. MPEs were treated with a targeted therapeutic (erlotinib according to the mutational status or chemotherapeutics based on the recommendation of the oncologists.We have established a robust system for the ex-vivo culture of MPEs and the application of drug tests in-vitro. The use of an antibody based magnetic cell separation system for epithelial cells before culture allowed treatment of effusions with only moderate tumor cell proportion. Experiments using drugs and drug-combinations revealed dose-dependent and specific growth inhibitory effects of targeted drugs.We developed a new approach for the ex-vivo culture of MPEs and the application of drug tests in-vitro using real-time measuring of cell growth, which precisely reproduced the effect of clinically established treatments by standard chemotherapy and targeted drugs. This sets the stage for future studies testing agents against specific targets from genomic profiling of metastatic tumor cells and multiple drug-combinations in a personalized manner.

  20. Handling equipment Selection in open pit mines by using an integrated model based on group decision making

    Directory of Open Access Journals (Sweden)

    Abdolreza Yazdani-Chamzini

    2012-10-01

    Full Text Available Process of handling equipment selection is one of the most important and basic parts in the project planning, particularly mining projects due to holding a high charge of the total project's cost. Different criteria impact on the handling equipment selection, while these criteria often are in conflicting with each other. Therefore, the process of handling equipment selection is a complex and multi criteria decision making problem. There are a variety of methods for selecting the most appropriate equipment among a set of alternatives. Likewise, according to the sophisticated structure of the problem, imprecise data, less of information, and inherent uncertainty, the usage of the fuzzy sets can be useful. In this study a new integrated model based on fuzzy analytic hierarchy process (FAHP and fuzzy technique for order preference by similarity to ideal solution (FTOPSIS is proposed, which uses group decision making to reduce individual errors. In order to calculate the weights of the evaluation criteria, FAHP is utilized in the process of handling equipment selection, and then these weights are inserted to the FTOPSIS computations to select the most appropriate handling system among a pool of alternatives. The results of this study demonstrate the potential application and effectiveness of the proposed model, which can be applied to different types of sophisticated problems in real problems.

  1. Guidance, navigation, and control subsystem equipment selection algorithm using expert system methods

    Science.gov (United States)

    Allen, Cheryl L.

    1991-01-01

    Enhanced engineering tools can be obtained through the integration of expert system methodologies and existing design software. The application of these methodologies to the spacecraft design and cost model (SDCM) software provides an improved technique for the selection of hardware for unmanned spacecraft subsystem design. The knowledge engineering system (KES) expert system development tool was used to implement a smarter equipment section algorithm than that which is currently achievable through the use of a standard data base system. The guidance, navigation, and control subsystems of the SDCM software was chosen as the initial subsystem for implementation. The portions of the SDCM code which compute the selection criteria and constraints remain intact, and the expert system equipment selection algorithm is embedded within this existing code. The architecture of this new methodology is described and its implementation is reported. The project background and a brief overview of the expert system is described, and once the details of the design are characterized, an example of its implementation is demonstrated.

  2. Materials selection for process equipment in the Hanford waste vitrification plant

    Energy Technology Data Exchange (ETDEWEB)

    Elmore, M R; Jensen, G A

    1991-07-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed to vitrify defense liquid high-level wastes and transuranic wastes stored at Hanford. The HWVP Functional Design Criteria (FDC) requires that materials used for fabrication of remote process equipment and piping in the facility be compatible with the expected waste stream compositions and process conditions. To satisfy FDC requirements, corrosion-resistant materials have been evaluated under simulated HWVP-specific conditions and recommendations have been made for HWVP applications. The materials recommendations provide to the project architect/engineer the best available corrosion rate information for the materials under the expected HWVP process conditions. Existing data and sound engineering judgement must be used and a solid technical basis must be developed to define an approach to selecting suitable construction materials for the HWVP. This report contains the strategy, approach, criteria, and technical basis developed for selecting materials of construction. Based on materials testing specific to HWVP and on related outside testing, this report recommends for constructing specific process equipment and identifies future testing needs to complete verification of the performance of the selected materials. 30 refs., 7 figs., 11 tabs.

  3. Additives on in vitro ruminal fermentation characteristics of rice straw

    Directory of Open Access Journals (Sweden)

    Vanessa Peripolli

    Full Text Available ABSTRACT The objective of this study was to evaluate the effects of mineral and protein-energy (MPES, exogenous fibrolytic enzyme supplements (ES, combination of MPES + ES, and straw without supplement (WS on digestibility, fermentation kinetic parameters, cumulative gas production, methane, CO2 production, and volatile fatty acid concentration of rice straw of low and high nutritional value, estimated by in vitro techniques. The experimental design was randomized and factorial 2 × 4: two straws (low and high nutritional value incubated with four supplements (MPES, ES, MPES + ES, and WS and their interactions. Four experimental periods were used, totaling four replications per treatment over time. Data were analyzed by PROC MIXED of SAS. The in vitro dry matter and organic matter digestibilities of the rice straw with high nutritional value was improved by MPES, while the combination of MPES + ES supplements inhibited the digestibility of this straw. Dietary carbohydrate and nitrogen increased through MPES and MPES + ES supplements resulted in an increase in NH3-N concentration and a decrease in CO2 production due to the microbial mass formation. However, this increase was not enough to improve organic matter degradability parameters, cummulative gas production, gas production kinetics, and acetate:propionate ratio and reduce methane emissions. The straw with high nutritional value showed greater content of nitrogen fraction a, effective degradability, cummulative gas production, and methane and CO2 productions comparing with low-nutritional value straw. The use of MPES and MPES + ES supplements can be used as strategy to mitigate CO2 in ruminant production systems that use rice straw.

  4. Enhanced Suppressive Activity of Regulatory T Cells in the Microenvironment of Malignant Pleural Effusions

    Directory of Open Access Journals (Sweden)

    Joanna Budna

    2018-01-01

    Full Text Available Cancer metastatic spread to serous cavity causes malignant pleural effusions (MPEs, indicating dismal prognosis. Tumor microenvironment can implement suppressive activity on host immune responses. Thus, we investigated the prevalence of Tregs and the relationship between them and TGF-β and IL-10 concentrations and measured expression of FOXP3, CTLA-4, CD28, and GITR genes, as well as protein expression of selected genes in benign effusions and MPEs. The percentage of Tregs was determined by means of multicolor flow cytometry system. TGF-β and IL-10 concentrations were measured using human TGF-β1 and IL-10 ELISA kit. Relative mRNA expression of studied genes was analyzed by real-time PCR. The frequency of Tregs was significantly higher in MPEs compared to benign effusions; however, the level of TGF-β and IL-10 in analyzed groups was comparable, and no correlation between concentrations of TGF-β and IL-10 and percentage of Tregs was observed. Relative mRNA expression of all the genes was higher in CD4+CD25+ compared to CD4+CD25− cells. In CD4+CD25+ cells from MPEs, relative mRNA expression of FOXP3, CTLA-4, and CD28 genes was significantly higher than in benign effusions; however, the level of CD4+CD25+CTLA-4+ cells in analyzed groups showed no significant differences. We found numerous genes correlations in an entire CD4+CD25+ cell subset and CD4+CD25+ cells from MPEs. Enhanced suppressive activity of Tregs is observed in the microenvironment of MPEs. Understanding of relations between cellular and cytokine immunosuppressive factors in tumor microenvironment may determine success of anticancer response.

  5. Optimal selection of major equipment in dual purpose plants

    International Nuclear Information System (INIS)

    Gabbrielli, E.

    1981-01-01

    Simulation of different operational conditions with the aid of a computer program is one of the best ways of assisting decision-makers in the selection of the most economic mix of equipment for a dual purpose plant. Using this approach this paper deals with the economic comparison of plants consisting of MSF desalinators and combustion gas or back pressure steam turbines coupled to low capacity electric power generators. The comparison is performed on the basis of the data made available by the OPTDIS computer program and the results are given in terms of yearly cost of production as the sum of capital, manpower, maintenance, fuel and chemical costs. (orig.)

  6. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  7. Mucoperiosteal exostoses in the tympanic bulla of African lions (Panthera leo).

    Science.gov (United States)

    Novales, M; Ginel, P J; Diz, A; Blanco, B; Zafra, R; Guerra, R; Mozos, E

    2015-03-01

    Mucoperiosteal exostoses (MpEs) of the tympanic bulla (TB), also referred as middle-ear otoliths, have been occasionally described in dogs and cats in association with clinical signs of otitis media or as an incidental finding, but they have not been recorded in other species. In this report, we describe the radiographic, gross, and histopathologic features of MpEs in 8 African lions (Panthera leo). All animals (5 males and 3 females) were adults that had been kept in captivity and had their skeletons conserved as part of an anatomic academic collection. A radiographic study revealed mineralized structures in the TB consistent with MpEs in 7 of the 16 examined TB; a computed tomography study identified MpEs in 12 of the 16 TB. Six TB from 4 lions were sectioned, and several MpEs were demineralized for histopathologic analysis. Grossly, MpEs appeared variable in number and shape. Some were globular structures that were loosely attached to the mucosal surface of the TB; others were isolated to coalescent bone spicules extending from the mucoperiosteum. Position was also variable, but MpEs frequently developed in the hypotympanum, especially on the ventromedial aspect of the TB wall. Microscopically, MpEs were composed of osteonal bone growing from the periosteum and not by dystrophic calcification of necrotic tissue debris, as is hypothesized in dogs. © The Author(s) 2014.

  8. DECISION ANALYSIS SCIENCE MODELING FOR APPLICATION AND FIELDING SELECTION APPLIED TO EQUIPMENT DISMANTLEMENT TECHNOLOGIES

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1999-01-01

    The dismantlement of radioactively contaminated process equipment is a major concern during the D and D process. There are an estimated 1,200 buildings in the DOE-EM complex that will require the dismantlement of equipment and various metal structures. As buildings undergo the D and D process, this metallic equipment contaminated with radionuclides such as uranium and plutonium must be size-reduced before final disposal. A single information source comparing dismantlement technologies in the areas of safety, cost, and performance is needed by DOE managers and is not currently available. The selection of the appropriate technologies to meet the dismantlement objectives for a given site is a difficult process in the absence of comprehensive and comparable data. Choosing the wrong technology could result in increased exposure of personnel to contaminants and an increase in D and D project costs. The purpose of this investigation was to evaluate commercially available and innovative technologies for equipment dismantlement and provide a comprehensive source of information to the D and D community in the areas of technology performance, cost, and health and safety

  9. Physician Acceptance of Pharmacist Recommendations about Medication Prescribing Errors in Iraqi Hospitals

    Directory of Open Access Journals (Sweden)

    ALI AZEEZ ALI AL-JUMAILI

    2016-08-01

    Full Text Available The objectives of this study were to measure the incidence and types of medication prescribing errors (MPEs in Iraqi hospitals, to calculate for the first time the percentage of physician agreement with pharmacist medication regimen review (MRR recommendations regarding MPEs, and to identify the factors influencing the physician agreement rate with these recommendations. Methods: Fourteen pharmacists (10 females and 4 males reviewed each hand-written physician order for 1506 patients who were admitted to two public hospitals in Al-Najaf, Iraq during August 2015. The pharmacists identified medication prescribing errors using the Medscape WebMD, LCC phone application as a reference. The pharmacists contacted the physicians (2 females and 34 males in-person to address MPEs that were identified. Results: The pharmacists identified 78 physician orders containing 99 MPEs with an incidence of 6.57 percent of all the physician orders reviewed. The patients with MPEs were taking 4.8 medications on average. The MPEs included drug-drug interactions (65.7%, incorrect doses (16.2%, unnecessary medications (8.1%, contra-indications (7.1%, incorrect drug duration (2%, and untreated conditions (1%. The physicians implemented 37 (37.4% pharmacist recommendations. Three factors were significantly related to physician acceptance of pharmacist recommendations. These were physician specialty, pharmacist gender, and patient gender. Pediatricians were less likely (OR= 0.1 to accept pharmacist recommendations compared to internal medicine physicians. Male pharmacists received more positive responses from physicians (OR=7.11 than female pharmacists. Lastly, the recommendations were significantly more likely to be accepted (OR= 3.72 when the patients were females. Conclusions: The incidence of MPEs is higher in Iraqi hospitalized patients than in the U.S. and U.K, but lower than in Brazil, Ethiopia, India, and Croatia. Drug-drug interactions were the most common type of

  10. Safety code 19: recommended safety procedures for the selection, installation and use of x-ray diffraction equipment

    International Nuclear Information System (INIS)

    1984-01-01

    This document is one of a series of Safety Codes prepared by the Radiation Protection Bureau to set out requirements for the safe use of radiation emitting devices. The equipment and installation guidelines and safety procedures detailed in this Code are primarily for the instruction and guidance of persons employed in Federal Public Service Departments and Agencies, as well as those coming under the jurisdiction of the Canada Labour Code. This Safety Code is also intended to assist other users of X-ray diffraction equipment to select safe equipment and to install and use it so that the radiation hazard to the operator and other persons in its vicinity is negligible. It should be noted that facilities under provincial jurisdiction may be subject to requirements specified under provincial statutes. This Code supersedes Safety Code RPD-SC-7, entitled 'Requirements For Non-Medical X-Ray Equipment, Use and Installation', insofar as X-ray diffraction equipment is concerned, and it is intended to complement X-ray equipment design, construction and performance standards promulgated under the Radiation Emitting Devices Act

  11. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  12. TU-G-201-00: Imaging Equipment Specification and Selection in Radiation Oncology Departments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    This session will update therapeutic physicists on technological advancements and radiation oncology features of commercial CT, MRI, and PET/CT imaging systems. Also described are physicists’ roles in every stage of equipment selection, purchasing, and operation, including defining specifications, evaluating vendors, making recommendations, and optimal and safe use of imaging equipment in radiation oncology environment. The first presentation defines important terminology of CT and PET/CT followed by a review of latest innovations, such as metal artifact reduction, statistical iterative reconstruction, radiation dose management, tissue classification by dual energy CT and spectral CT, improvement in spatial resolution and sensitivity in PET, and potentials of PET/MR. We will also discuss important technical specifications and items in CT and PET/CT purchasing quotes and their impacts. The second presentation will focus on key components in the request for proposal for a MRI simulator and how to evaluate vendor proposals. MRI safety issues in radiation Oncology, including MRI scanner Zones (4-zone design), will be discussed. Basic MR terminologies, important functionalities, and advanced features, which are relevant to radiation therapy, will be discussed. In the third presentation, justification of imaging systems for radiation oncology, considerations in room design and construction in a RO department, shared use with diagnostic radiology, staffing needs and training, clinical/research use cases and implementation, will be discussed. The emphasis will be on understanding and bridging the differences between diagnostic and radiation oncology installations, building consensus amongst stakeholders for purchase and use, and integrating imaging technologies into the radiation oncology environment. Learning Objectives: Learn the latest innovations of major imaging systems relevant to radiation therapy Be able to describe important technical specifications of CT, MRI

  13. Selection of construction materials for equipment in an experimental reprocessing plant

    International Nuclear Information System (INIS)

    Mizrahi, R.; Cragnolino, G.A.

    1994-01-01

    A review is made of the most significant corrosion problems that may be present in different stages of the process in a spent fuel reprocessing plant. The influence of different variables is analyzed: concentration of nitric acid and other oxidizing species, temperature, etc., in corrosion of materials of most frequent use in pipings and equipment. The materials are austenitic stainless steels and refractory metals, especially zirconium and its alloys. Both general and localized corrosion phenomena are analyzed for these materials. Selection criteria for the use of adequate material in different components of the plant are also discussed. (author). 32 refs., 20 figs., 3 tabs

  14. Exploiting Cross-sensitivity by Bayesian Decoding of Mixed Potential Sensor Arrays

    Energy Technology Data Exchange (ETDEWEB)

    Kreller, Cortney [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    LANL mixed-potential electrochemical sensor (MPES) device arrays were coupled with advanced Bayesian inference treatment of the physical model of relevant sensor-analyte interactions. We demonstrated that our approach could be used to uniquely discriminate the composition of ternary gas sensors with three discreet MPES sensors with an average error of less than 2%. We also observed that the MPES exhibited excellent stability over a year of operation at elevated temperatures in the presence of test gases.

  15. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  16. Seismic assessment of selected buildings and equipment contents of a DOE facility in UBC zone 2A

    International Nuclear Information System (INIS)

    Tong, W.H.; Deneff, C.; Griffin, M.J.

    1991-01-01

    A preliminary seismic risk assessment for selected buildings and representative equipment contents in Allied-Signal Kansas City Division was performed to identify potential seismic hazard and weakness. The site is located in the Uniform Building Code Zone 2A. The selected building structures were constructed between 1940s to 1980s. The performance goal was to qualitatively assess the potential for loss of toxic or hazardous materials and injury to plant personnel due to an earthquake event

  17. FUSRAP equipment concept development study

    International Nuclear Information System (INIS)

    Hinerman, K.B.; Smith, R.E.

    1981-01-01

    Under DOE contract, Dalton-Dalton-Newport, Inc. is performing an engineering evaluation of three selected FUSRAP sites in an effort to generate equipment concepts to perform remedial action for retrieval, packaging, storing, and transporting contaminated soil and other debris. Along with this engineering evaluation, an analysis of state and Federal regulations was made which had significant impact on the selected equipment and costs for each remedial action concept

  18. The UK market for gaseous emissions control equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The report analyses the changes in demand for gaseous emissions control equipment in the United Kingdom over the next 5 years. It discusses the factors affecting demand such as legislation reporting of environmental performance, and economic factors. It looks at environmental expenditure by UK industry. Markets are examined, for VOC abatement systems; thermal incinerators; adsorption equipment; catalytic oxidisers; absorption equipment; biological treatments; cryogenic equipment; SO{sub x} abatement equipment; wet FGD; wet dry FGD, dry scrubbers; NOx abatement systems; selective catalytic reduction; and selective non-catalytic reduction. Profiles are given of 16 leading suppliers.

  19. Electrostatic Properties of Selected Personal Protective Equipment Regarding Explosion Hazard

    Directory of Open Access Journals (Sweden)

    Marcin Jachowicz

    2013-01-01

    Full Text Available In industries such as the mining, petrochemistry or power industries, personal protective equipment is often used in explosive atmospheres. What causes the occurrence of explosive hazards is ever-present in the work environment they include, electrostatic phenomena as well as the build-up of electrical charges on the surface of the protective equipment used. This paper presents the results of studies which were aimed at determining the fundamental electrostatic parameters of protective helmets as well as eye and face protection, surface resistance and the voltage of electrostatic fields. Examinations on the typical structure of the above mentioned equipment was conducted including the variable values of ambient humidity, which can occur in the working environment and with the use of various types of materials used to generate a charge. The adopted methods and testing equipment have been presented. Using the current, general requirements regarding the electrostatic properties of materials, the examined helmets and eye protection were assessed for their use in explosive atmospheres.

  20. Procedures for selecting and buying district heating equipment. Sofia district heating. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The aim of this Final Report, prepared for the project `Procedures for Selecting and Buying DistRict Heating Equipment - Sofia District Heating Company`, is to establish an overview of the activities accomplished, the outputs delivered and the general experience gained as a result of the project. The main objective of the project is to enable Sofia District Heating Company to prepare specifications and tender documents, identify possible suppliers, evaluate offers, etc. in connection with purchase of district heating equipment. This objective has been reached by using rehabilitation of sub-stations as an example requested by Sofia DH. The project was originally planned to be finalized end of 1995, but due to the extensions of the scope of work, the project has been prolonged until end 1997. The following main activities were accomplished: Preparation of a detailed work plan; Collection of background information; Discussion and advice about technical specifications and tender documents for sub-station rehabilitation; Input to terms of reference for a master plan study; Input to technical specification for heat meters; Collection of ideas for topics and examples related to dissemination of information to consumers about matters related to district heating consumption. (EG)

  1. Decision Analysis Science Modeling for Application and Fielding Selection Applied to Equipment Dismantlement Technologies. Topical Report January 1998

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1998-01-01

    The dismantlement of radioactively contaminated process equipment is a major concern during the D and D process. As buildings undergo the D and D process, metallic equipment contaminated with radionuclides such as uranium and plutonium must be dismantled before final disposal.The primary objective for equipment dismantlement is to reduce the potential for personnel and environmental exposure to contaminants during the decommissioning of the nuclear facility. The selection of the appropriate technologies to meet the dismantlement objectives for a given site is a difficult process in the absence of comprehensive and comparable data. Choosing the wrong technology could result in increased exposure of personnel to contaminants and an increase in D and D project costs. Innovative technologies are being developed with the goal of providing safer and more cost-effective alternatives that generate less secondary waste, thereby decreasing the operating costs for dismantlement. During the development and implementation process, performance indicators for the success of these technologies must be reviewed to ensure that these aims are being met. This project provides a mechanism for the assessment of innovative and commercially available nuclear and non-nuclear technologies for equipment dismantlement

  2. An Expert System for Supporting the Design and Selection of Mechanical Equipment for Recreational Crafts

    Directory of Open Access Journals (Sweden)

    T. Gonciarz

    2014-06-01

    Full Text Available Expert Systems can be defined as computer programs, whose main task is to simulate a human expert, usually in a narrow field of expertise. Expert Systems have experienced tremendous growth and popularity since their commercial introduction in the early 1970’s. Today, Expert Systems are used in business, science, engineering, manufacturing and other engineering applications such as planning, scheduling, diagnosing equipment failures and are used in almost every stage of the manufacturing process and also in medicine and many other fields. Expert Systems belong to the field of artificial intelligence. An intelligent computer program that uses knowledge and inference procedures to solve problems that are difficult enough to require significant human expertise for the solution. The purpose of this paper is to present an Expert System which assists with the design of yachts and supports the selection of mechanical equipment for yachts and includes knowledge in the field of yachting engineering. Using the presented Expert System reduces the time during the design and production preparation process.

  3. SCHOOL LUNCH, SUGGESTED GUIDES FOR SELECTING LARGE EQUIPMENT.

    Science.gov (United States)

    South Carolina State Dept. of Education, Columbia.

    THE TYPE AND CAPACITY OF A WIDE RANGE OF SCHOOL KITCHEN EQUIPMENT IS RECOMMENDED WITH RESPECT TO THE NUMBER OF MEALS SERVED PER DAY. THESE RECOMMENDATIONS ARE GIVEN FOR RANGES, SINKS, ELECTRIC HEATING, GAS HEATING, REFRIGERATION, TABLES, KITCHEN MACHINES, TRUCK DOLLIES, SCALES, STORAGE CABINETS, OFFICE SPACES, LOUNGES, GARBAGE AND CAN WASHING…

  4. Is the EU Harmonization of Excise Taxes on Tobacco Products a Barrier to Health Promotion?

    DEFF Research Database (Denmark)

    Thygesen, Jette

    2013-01-01

    Verden over er der enighed om, at tobaksforbruget til stadighed er et sundhedsproblem, der skal bekæmpes. På EU-plan er der enighed om at tobaksrygningens sundhedsskadelige virkning bør bekæmpes gennem lovgivningsmæssige tiltag. Spørgsmålet er imidlertid, hvilke lovgivningsmæssige tiltag der skal...

  5. Optimization of safety equipment outages improves safety

    International Nuclear Information System (INIS)

    Cepin, Marko

    2002-01-01

    Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one

  6. Constructing a User Interface for Cellular Phones Using Equipment and its Relations

    Directory of Open Access Journals (Sweden)

    Misayo Kitamura

    2003-04-01

    Full Text Available In a domain of SCADA (Supervisory Control And Data Acquisition systems, it is necessary to obtain information about plants such as water plants in remote places using a cellular phone in order to ascertain plant status in case of emergency.T o utilize the small screen of a cellular phone and to eliminate the engineering cost of creating de.nition data to show plant status, a method of constructing user interface using equipment in the plant and its relations is proposed. In this method, some equipment is selected from all supervised equipment using the relations between the equipment, and then the content to be displayed is generated dynamically using the selected equipment. The equipment in plants is organized as a graph structure, which involves the equipment and the relations between the equipment.T he relations adopted in this method are both the physical connections between the equipment and the conceptual relationships.The result of the selection depends on the relations and their parameter values called the context dependent weight, which changes dynamically by viewpoints.

  7. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  8. Integrated configurable equipment selection and line balancing for mass production with serial-parallel machining systems

    Science.gov (United States)

    Battaïa, Olga; Dolgui, Alexandre; Guschinsky, Nikolai; Levin, Genrikh

    2014-10-01

    Solving equipment selection and line balancing problems together allows better line configurations to be reached and avoids local optimal solutions. This article considers jointly these two decision problems for mass production lines with serial-parallel workplaces. This study was motivated by the design of production lines based on machines with rotary or mobile tables. Nevertheless, the results are more general and can be applied to assembly and production lines with similar structures. The designers' objectives and the constraints are studied in order to suggest a relevant mathematical model and an efficient optimization approach to solve it. A real case study is used to validate the model and the developed approach.

  9. Impact of Auxiliary Equipments Consumption on Electricity Generation Cost in Selected Power Plants of Pakistan

    Directory of Open Access Journals (Sweden)

    DILEEP KUMAR

    2017-04-01

    Full Text Available This study focuses on higher generation cost of electricity in selected TPPs (Thermal Power Plants in Sindh, Pakistan. It also investigates the energy consumed by the auxiliary equipment of the selected TPPs in Sindh, Pakistan. The AC (Auxiliary Consumption of selected TPPs is compared with that in UK and other developed countries. Results show that the AC in selected TPPs in Sindh, Pakistan exceeds the average AC of the TPPs situated in developed countries. Many energy conservation measures such as impeller trimming and de-staging, boiler feed pump, high voltage inverter, variable frequency drive, and upgrading the existing cooling tower fan blades with fiber reinforced plastic are discussed to overcome higher AC. This study shows that harnessing various available energy conservative measures the AC and unit cost can be reduced by 4.13 and 8.8%; also adverse environmental impacts can be mitigated. Results show that the unit cost of electricity can be reduced from Rs.20 to19/kWh in JTPP (Jamshoro Thermal Power Plant, Rs.9 to 8.8/kWh in GTPS (Gas Turbine Power Station Kotri and Rs. 11 to 10.27/ kWh in LPS (Lakhara Power Station. Thus, electricity production can be improved with the existing capacity, which will eventually assist to manage the current energy crisis and ensure its conservation

  10. Rational use of energy in air conditioning equipment, through an appropriate selection of the main equipment; Uso racional de la energia en equipos de aire acondicionado, mediante la eleccion apropiada del equipo principal

    Energy Technology Data Exchange (ETDEWEB)

    Reyes Zuniga, Jose de Jesus; Herrera Ramos, Manuel [Instituto Mexicano del Petroleo (Mexico)

    1996-07-01

    This paper presents an analysis to diminish the consumption of energy in central air conditioning equipment through an appropriate selection of the equipment. The analysis shows the levels of security and toxicity of the refrigerant, the operational, constructive and economic advantages of the equipment, taking as reference the cooling demand and expenses of energy consumption, as well as the ecological impact derived from the use of the refrigerant. Finally, an economic analysis is presented, involving the expenses of the equipment, operation, maintenance, costs of the consumption of used fluids, et cetera. [Spanish] Uso racional de la energia en equipos de aire acondicionado, mediante la eleccion apropiada del equipo principal. Este trabajo presenta un analisis para disminuir el consumo de energia en los equipos centrales de aire acondicionado mediante la seleccion apropiada del equipo. El analisis muestra los niveles de seguridad y toxicidad del refrigerante, las ventajas operativas, constructivas y economicas del equipo, tomando como referencia la demanda de enfriamiento y gastos de consumo de energia, asi como el impacto ecologico derivado de su empleo del refrigerante. Finalmente, se presenta un analisis economico, involucrando los gastos del equipo, operacion, mantenimiento, costos de consumos de fluidos utilizados, etcetera.

  11. Selection of AT-Tank Analysis Equipment for Determining Completion of Mixing and Particle Concentration in Hanford Waste Tanks

    International Nuclear Information System (INIS)

    Dodson, M.G.; Ozanich, R.M.; Bailey, S.A.

    1999-01-01

    This document will describe the functions and requirements of the at-tank analysis system concept developed by the Robotics Technology Development Program (RTDP) and Berkeley Instruments. It will discuss commercially available at-tank analysis equipment, and compare those that meet the stated functions and requirements. This is followed by a discussion of the considerations used in the selection of instrumentation for the concept design, and an overall description of the proposed at-tank analysis system

  12. Systematic Model for Validating Equipment Uses in Selected Marketing and Distribution Education Programs. Final Report, February 1, 1980-June 30, 1981.

    Science.gov (United States)

    Gildan, Kate; Buckner, Leroy

    Research was conducted to provide a model for selecting equipment for marketing and distributive education programs that was required for the development of the skills or competencies needed to perform in marketing and distribution occupation. A research of the literature identified both competency statements for three program areas--Fashion…

  13. Examining elite Parasport athletes with sport involvement and sports equipment.

    Science.gov (United States)

    Hambrick, Marion E; Hums, Mary A; Bower, Glenna G; Wolff, Eli A

    2015-01-01

    Elite athletes require the most advanced sports equipment to maintain their competitive edge, but manufacturers cannot always satisfy these athletes' specific equipment needs. Sport involvement can influence sports-equipment selections and is described as the process by which individuals rely on attitudes and belief systems to make sports-related consumption decisions. This study involved semistructured interviews with 5 elite Parasport athletes to identify and analyze the role of sport involvement in their selection of sports equipment. The results revealed that the athletes identified product limitations, created a collaborative environment, and promoted a culture of innovation to develop new sports products and address existing limitations. Theoretical and practical implications are discussed.

  14. 47 CFR 80.225 - Requirements for selective calling equipment.

    Science.gov (United States)

    2010-10-01

    ... Commission will not accept new applications (but will continue to process then-pending applications) for certification of non-portable DSC equipment that does not meet the requirements of ITU-R Recommendation M.493-11... Commission will not accept new applications (but will continue to process then-pending applications) for...

  15. Equipment selection for atmospheric drying

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, P D; Bhattacharyya, S [Nuclear Power Corporation, Bhabha Atomic Research Centre, Mumbai (India)

    1994-06-01

    Heavy water management is a major factor in deciding the economics of the PHWRs. Hence it is necessary to have an efficient recovery system, for the heavy water vapour escaping from various process systems and maintain a dry atmosphere in the recovery areas. While the basic objective of the atmospheric drying system is to maximize recovery and to minimize stack losses, it is equally important to optimally design the system with due consideration to operational and maintenance aspects. At present, heavy water vapour recovery in the existing Nuclear Power Plants (NPPs) is carried out by dryers of dual fixed bed design. While moving bed design could have some advantages, this has not been adopted so far because of the cumbersome mechanical design involved and special requirements for nuclear application. Developmental work done in this direction has resulted in compact alternative designs. In one of the designs, the change over from adsorption to regeneration is achieved by rotating the bed slowly. This concept is further refined in another alternative using a dessicant wheel. This paper contains brief equipment description of different designs; enumerates the design requirements of an atmospheric drying system for reactor building; describes steps for designing fixed bed type D{sub 2}O vapour recovery system, and highlights advances in dryer technology. (author). 2 refs., 4 figs., 1 ill.

  16. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  17. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  18. Recommended safety procedures for the selection, installation and use of baggage inspection x-ray equipment

    International Nuclear Information System (INIS)

    1978-05-01

    Good X-ray equipment alone will not preclude unnecessary exposure to x-radiation. The equipment must be installed, maintained and used by adequately trained personnel, with due regard for the inherent hazards of such equipment and an appreciation of the need to observe proper operational procedures. It is the intent of this Code to define equipment specifications and conditions of installation and use for baggage inspection X-ray equipment, such that the hazard to operating personnel and the general public from such devices remains negligibly small. (auth)

  19. Records Management Handbook; Source Data Automation Equipment Guide.

    Science.gov (United States)

    National Archives and Records Service (GSA), Washington, DC. Office of Records Management.

    A detailed guide to selecting appropriate source data automation equipment is presented. Source data automation equipment is used to prepare data for electronic data processing or computerized recordkeeping. The guide contains specifications, performance data cost, and pictures of the major types of machines used in source data automation.…

  20. Justification of parameters and selection of equipment for laboratory researches of a rammer's operating element dynamics in a soil foundation of a tank for oil and oil products storage

    Science.gov (United States)

    Gruzin, A. V.; Gruzin, V. V.; Shalay, V. V.

    2017-08-01

    The development of technology for a directional soil compaction of tank foundations for oil and oil products storage is a relevant problem which solution will enable simultaneously provide required operational characteristics of a soil foundation and reduce time and material costs to prepare the foundation. The impact dynamics of rammers' operating elements on the soil foundation is planned to specify in the course of laboratory studies. A specialized technique is developed to justify the parameters and select the equipment for laboratory researches. The usage of this technique enabled us to calculate dimensions of the models, of a test bench and specifications of the recording equipment, and a lighting system. The necessary equipment for laboratory studies was selected. Preliminary laboratory tests were carried out. The estimate of accuracy for planned laboratory studies was given.

  1. Origins of eponymous orthopaedic equipment.

    Science.gov (United States)

    Meals, Clifton; Wang, Jeffrey

    2010-06-01

    Orthopaedists make great use of eponymous equipment, however the origins of these tools are unknown to many users. This history enriches, enlightens, and enhances surgical education, and may inspire modern innovation. We explored the origins of common and eponymous orthopaedic equipment. We selected pieces of equipment named for their inventors and in the broadest use by modern orthopaedists. We do not describe specialized orthopaedic implants and instruments owing to the overwhelming number of these devices. The history of this equipment reflects the coevolution of orthopaedics and battlefield medicine. Additionally, these stories evidence the primacy of elegant design and suggest that innovation is often a process of revision and refinement rather than sudden inspiration. Their history exposes surgical innovators as brilliant, lucky, hardworking, and sometimes odd. These stories amuse, enlighten, and may inspire modern orthopaedists to develop creative solutions of their own. The rich history of the field's eponymous instruments informs an ongoing tradition of innovation in orthopaedics.

  2. CERN News: Selection of the type of superconducting coil for the Omega project; New intensity records at the proton synchrotron; Progress with the Spiral Reader film measuring equipment; New technique at transition energy on the proton synchrotron; CERN Courier 10th anniversary; Equipment travelling from and to Serpukhov

    CERN Multimedia

    1969-01-01

    CERN News: Selection of the type of superconducting coil for the Omega project; New intensity records at the proton synchrotron; Progress with the Spiral Reader film measuring equipment; New technique at transition energy on the proton synchrotron; CERN Courier 10th anniversary; Equipment travelling from and to Serpukhov

  3. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  4. Microbial Photoelectrosynthesis for Self-Sustaining Hydrogen Generation.

    Science.gov (United States)

    Lu, Lu; Williams, Nicholas B; Turner, John A; Maness, Pin-Ching; Gu, Jing; Ren, Zhiyong Jason

    2017-11-21

    Current artificial photosynthesis (APS) systems are promising for the storage of solar energy via transportable and storable fuels, but the anodic half-reaction of water oxidation is an energy intensive process which in many cases poorly couples with the cathodic half-reaction. Here we demonstrate a self-sustaining microbial photoelectrosynthesis (MPES) system that pairs microbial electrochemical oxidation with photoelectrochemical water reduction for energy efficient H 2 generation. MPES reduces the overall energy requirements thereby greatly expanding the range of semiconductors that can be utilized in APS. Due to the recovery of chemical energy from waste organics by the mild microbial process and utilization of cost-effective and stable catalyst/electrode materials, our MPES system produced a stable current of 0.4 mA/cm 2 for 24 h without any external bias and ∼10 mA/cm 2 with a modest bias under one sun illumination. This system also showed other merits, such as creating benefits of wastewater treatment and facile preparation and scalability.

  5. Influence of Flat-Panel Fluoroscopic Equipment Variables on Cardiac Radiation Doses

    International Nuclear Information System (INIS)

    Nickoloff, Edward L.; Lu Zhengfeng; Dutta, Ajoy; So, James; Balter, Stephen; Moses, Jeffrey

    2007-01-01

    Purpose. To assess the influence of physician-selectable equipment variables on the potential radiation dose reductions during cardiac catheterization examinations using modern imaging equipment. Materials. A modern bi-plane angiography unit with flat-panel image receptors was used. Patients were simulated with 15-30 cm of acrylic plastic. The variables studied were: patient thickness, fluoroscopy pulse rates, record mode frame rates, image receptor field-of-view (FoV), automatic dose control (ADC) mode, SID/SSD geometry setting, automatic collimation, automatic positioning, and others. Results. Patient radiation doses double for every additional 3.5-4.5 cm of soft tissue. The dose is directly related to the imaging frame rate; a decrease from 30 pps to 15 pps reduces the dose by about 50%. The dose is related to [(FoV) -N ] where 2.0 < N < 3.0. Suboptimal positioning of the patient can nearly double the dose. The ADC system provides three selections that can vary the radiation level by 50%. For pediatric studies (2-5 years old), the selection of equipment variables can result in entrance radiation doses that range between 6 and 60 cGy for diagnostic cases and between 15 and 140 cGy for interventional cases. For adult studies, the equipment variables can produce entrance radiation doses that range between 13 and 130 cGy for diagnostic cases and between 30 and 400 cGy for interventional cases. Conclusions. Overall dose reductions of 70-90% can be achieved with pediatric patients and about 90% with adult patients solely through optimal selection of equipment variables

  6. Teaching Animal Habitat Selection Using Wildlife Tracking Equipment

    Science.gov (United States)

    Laskowski, Jessica; Gillespie, Caitlyn; Corral, Lucia; Oden, Amy; Fricke, Kent; Fontaine, Joseph J.

    2016-01-01

    We present a hands-on outdoor activity coupled with classroom discussion to teach students about wildlife habitat selection, the process by which animals choose where to live. By selecting locations or habitats with many benefits (e.g., food, shelter, mates) and few costs (e.g., predators), animals improve their ability to survive and reproduce.…

  7. Controlling the quality of replacement parts in nuclear station, class 1E equipment

    International Nuclear Information System (INIS)

    Pierson, R.K.; Clemons, R.W.

    1984-01-01

    Nuclear station owners have traditionally purchased replacement parts for Class 1E equipment from the original supplier of the equipment. By this method, part and equipment quality could be maintained. In recent years, however, this traditional source of parts has continuously declined as an increasing number of original equipment suppliers stop producing Class 1E equipment or no longer stock parts for older equipment. When replacement parts for Class 1E equipment are not obtainable from the original suppliers, equipment owners have created a variety of methods for assuring the quality of parts obtained from other sources. A standard that provides direction and guidance for maintaining the quality of Class 1E equipment when repaired with parts from alternate sources is, therefore, needed to assure the methods in use are satisfactory and to alert the equipment owners to additional acceptable methods. The standard has now been proposed. IEEE Standard P934 (June, 1983 Draft): ''Requirements for Replacement Parts for Class 1E Equipment in Nuclear Power Generating Stations'' (Ref-3) consist of an introductory section followed by sections on part selection, procurement, replacement (including inspections and tests), non-conforming conditions and records. The proposed standard also includes a non-mandatory appendix on acceptable procurement methods and a summary intended to assist the user in selecting a proper procurement method

  8. Exportações brasileiras: fatores explicativos da participação das micro e pequenas empresas (MPE)

    OpenAIRE

    Fernando Martinson Ruiz

    2005-01-01

    As micro e pequenas empresas (MPEs), foco desta pesquisa, apresentam características peculiares em comparação às empresas de maior porte. O número de MPEs brasileiras, industriais e exportadoras vem aumentando nos últimos anos, assim como a continuidade de suas atividades exportadoras, configurando um novo panorama para este tipo de empresas. A participação destas empresas no volume de exportação total do país ainda é muito pequena (aproximadamente 2,4%, em 2003), para padrões internacionais ...

  9. Comparison of Customer Preference for Bulk Material Handling Equipment through Fuzzy-AHP Approach

    Science.gov (United States)

    Sen, Kingshuk; Ghosh, Surojit; Sarkar, Bijan

    2017-06-01

    In the present study, customer's perception has played one of the important roles for selection of the exact equipment out of available alternatives. The present study is dealt with the method of optimization of selection criteria of a material handling equipment, based on the technical specifications considered to be available at the user end. In this work, the needs of customers have been identified and prioritized, that lead to the selection of number of criteria, which have direct effect upon the performance of the equipment. To check the consistency of selection criteria, first of all an AHP based methodology is adopted with the identified criteria and available product categories, based upon which, the judgments of the users are defined to derive the priority scales. Such judgments expressed the relative strength or intensity of the impact of the elements of the hierarchy. Subsequently, all the alternatives have ranked for each identified criteria with subsequent constitution of weighted matrices. The same has been compared with the normalized values of approximate selling prices of the equipments to determine individual cost-benefit ratio. Based on the cost-benefit ratio, the equipment is ranked. With same conditions, the study is obtained again with a Fuzzy AHP concept, where a fuzzy linguistic approach has reduced the amount of uncertainty in decision making, caused by conventional AHP due to lack of deterministic approach. The priority vectors of category and criteria are determined separately and multiplied to obtain composite score. Subsequently, the average of fuzzy weights was determined and the preferences of equipment are ranked.

  10. Design guide for heat transfer equipment in water-cooled nuclear reactor systems

    International Nuclear Information System (INIS)

    1975-07-01

    Information pertaining to design methods, material selection, fabrication, quality assurance, and performance tests for heat transfer equipment in water-cooled nuclear reactor systems is given in this design guide. This information is intended to assist those concerned with the design, specification, and evaluation of heat transfer equipment for nuclear service and the systems in which this equipment is required. (U.S.)

  11. Labelling of equipment dispensers.

    Science.gov (United States)

    Gray, D C

    1993-01-01

    A new labelling system for use on medical equipment dispensers is tested. This system uses one of the objects stored in each unit of the dispenser as the 'label', by attaching it to the front of the dispenser with tape. The new system was compared to conventional written labelling by timing subjects asked to select items from two dispensers. The new system was 27% quicker than the conventional system. Images Fig. 1 PMID:8110335

  12. Seismic qualification of nuclear equipment under multiple support excitations

    International Nuclear Information System (INIS)

    Neelwarne, A.; Kushwaha, H.S.; Kakodkar, A.

    1991-01-01

    ERS (Envelop Response Spectrum) is a conservative method for seismic analysis of equipment without overhang whereas it may severely underestimate the response, as compared to the time history response, for the case of overhanging equipment. However, MSRS (Multi Support Response Spectrum) method appears to give conservative results for both class of equipment. Inability to account a) magnification of response and b) contribution of antisymmetric modes resulting from relative support motion are found to be the reasons for unconservatism of ERS method. A simple criterion for selection of proper method, between ERS and MSRS, for the analysis of overhanging equipment is developed. The criterion is based on correlation of modal mass with the modal normal coordinate and is applicable to generalised equipment of non uniform mass and stiffness distribution. It is shown that; 1) MSRS method must be adopted if equipment first mode corresponds to vibration of overhanging masses. 2) MSRS method should be adopted if the modal mass for the first mode is less than 15 % of equipment mass. 3) Algebraic support group combination appears to give realistic results for the analysis of equipment. This is due to the dominant cantilever beam like behaviour of primary structure resulting in near in-phase motion at equipment supports. (author)

  13. SESSA: Expert system for the selection of air conditioning equipment; SESEAA: Sistema experto para la seleccion de equipos de aire acondicionado

    Energy Technology Data Exchange (ETDEWEB)

    Kemper Valverde, Nicolas; Cardenas Perez, Edgar [Laboratorio de Sistemas Inteligentes, Centro de Instrumentos de la Universidad Nacional Autonoma de Mexico (UNAM), Mexico, D. F. (Mexico)

    1998-12-31

    The problem of selecting air conditioning and refrigeration equipment is quite wide and complex, since it encompasses from the application of the basic principles of physics and of thermodynamics up to the classic engineering design problems; these in turn can be numberless since they vary from place to place depending on multiple factors such as the region geographic and economic conditions. On the other hand, account most be taken of several elements such as windows, walls, and its specific geographical orientation, roofs, floors, partitions, equipment, lighting, etc., all this exerts influence in the complexity that represents the selection process. This paper describes a useful informatics tool to make it easy the selection process in air conditioning installations, taking into account multiple saving and efficient use of energy criteria, reflected in the operation process of these installations. [Espanol] El problema de seleccion de sistemas de aire acondicionado y de refrigeracion es bastante amplio y complejo, ya que abarca desde la aplicacion de los principios basicos de la fisica y la termodinamica hasta los problemas clasicos de diseno de ingenieria; estos a la vez pueden ser innumerables ya que varian de un lugar a otro y de un proyecto a otro, dependiendo de multiples factores tales como las condiciones geograficas y economicas de la region. Por otra parte se deben tomar en cuenta diversos elementos como son: ventanas, muros y sus orientaciones especificas, techos, pisos, particiones, equipos, iluminacion, etc., todo esto influye en la complejidad que representa el proceso de seleccion. En el presente trabajo se describe una herramienta informatica para facilitar el proceso de seleccion de instalaciones de aire acondicionado, tomando en cuenta multiples criterios de ahorro y uso eficiente de energia que se reflejan durante el proceso de operacion de estas instalaciones.

  14. SESSA: Expert system for the selection of air conditioning equipment; SESEAA: Sistema experto para la seleccion de equipos de aire acondicionado

    Energy Technology Data Exchange (ETDEWEB)

    Kemper Valverde, Nicolas; Cardenas Perez, Edgar [Laboratorio de Sistemas Inteligentes, Centro de Instrumentos de la Universidad Nacional Autonoma de Mexico (UNAM), Mexico, D. F. (Mexico)

    1999-12-31

    The problem of selecting air conditioning and refrigeration equipment is quite wide and complex, since it encompasses from the application of the basic principles of physics and of thermodynamics up to the classic engineering design problems; these in turn can be numberless since they vary from place to place depending on multiple factors such as the region geographic and economic conditions. On the other hand, account most be taken of several elements such as windows, walls, and its specific geographical orientation, roofs, floors, partitions, equipment, lighting, etc., all this exerts influence in the complexity that represents the selection process. This paper describes a useful informatics tool to make it easy the selection process in air conditioning installations, taking into account multiple saving and efficient use of energy criteria, reflected in the operation process of these installations. [Espanol] El problema de seleccion de sistemas de aire acondicionado y de refrigeracion es bastante amplio y complejo, ya que abarca desde la aplicacion de los principios basicos de la fisica y la termodinamica hasta los problemas clasicos de diseno de ingenieria; estos a la vez pueden ser innumerables ya que varian de un lugar a otro y de un proyecto a otro, dependiendo de multiples factores tales como las condiciones geograficas y economicas de la region. Por otra parte se deben tomar en cuenta diversos elementos como son: ventanas, muros y sus orientaciones especificas, techos, pisos, particiones, equipos, iluminacion, etc., todo esto influye en la complejidad que representa el proceso de seleccion. En el presente trabajo se describe una herramienta informatica para facilitar el proceso de seleccion de instalaciones de aire acondicionado, tomando en cuenta multiples criterios de ahorro y uso eficiente de energia que se reflejan durante el proceso de operacion de estas instalaciones.

  15. Apparatus for determining the thermal history of equipment using solid state track recorders

    International Nuclear Information System (INIS)

    Ruddy, F.H.; Lippincott, E.P.; Fero, A.H.; Schreiber, R.B.; Seidel, J.G.

    1991-01-01

    This patent describes a nuclear power plant having equipment subject to thermal aging, the rate of the thermal aging being capable of characterization by at least one equipment Arrhenius function of temperature, the equipment being subjected to a temperature environment having a predetermined range of temperatures, apparatus for determining the thermal aging which has occurred in the equipment. It comprises passive sensors, each of the sensors being formed from a selected material and subject to a thermal aging process within the range of temperatures, the extent of the thermal aging in each respective sensor being quantifiable, the rate at which the thermal aging process progresses in each of the sensors being characterized by a respective Arrhenius function of temperature; and the selected material not being the same for each of the sensors, whereby the range of activation energy values characterizing the respective Arrhenius functions encompasses the activation energy value characterizing the equipment Arrhenius function

  16. Hydraulic turbines and auxiliary equipment

    Energy Technology Data Exchange (ETDEWEB)

    Luo Gaorong [Organization of the United Nations, Beijing (China). International Centre of Small Hydroelectric Power Plants

    1995-07-01

    This document presents a general overview on hydraulic turbines and auxiliary equipment, emphasizing the turbine classification, in accordance with the different types of turbines, standard turbine series in China, turbine selection based on the basic data required for the preliminary design, general hill model curves, chart of turbine series and the arrangement of application for hydraulic turbines, hydraulic turbine testing, and speed regulating device.

  17. The manager and equipment decisions: is that in the capital budget?

    Science.gov (United States)

    McConnell, C R

    2001-06-01

    Although any decision to purchase a piece of capital equipment involves a number of the organization's functions, the department manager has some significant responsibilities in the selection and acquisition of capital equipment. Except for unavoidable replacement of essential equipment that fails unexpectedly, capital purchases must ordinarily be planned in advance through the annual budgeting process. The department manager is ordinarily the organization's primary source of information in major capital expenditure projects; therefore, it is essential that the manager follow a logical process for identifying and evaluating alternative equipment choices and perform a consistent economic analysis of the alternatives.

  18. Tracking Unmanned Aerial Vehicle CTU FTS - Application of equipment

    Directory of Open Access Journals (Sweden)

    David Hůlek

    2015-10-01

    Full Text Available Article which is about the Tracking Unmanned Aerial Vehicle continues in the description of the project development dealing with the utilization of the UAV (unmanned aerial vehicle. Documentation of the project progresses builds on the previous article. In that article the selection of observation and transmission equipment was summarized. In the article, the reader learns about an installation of the equipment on the UAV (helicopter, about an interconnection of the equipment to create complete and functional system, about testing of the UAV, about the solutions of the problems which came into being during testing and about protection of the equipment against unfavourable effects. The location of equipment on the unmanned vehicle was chosen after a considering of several parameters. These parameters are preservation of the functionality or an influence to the balance. To find out how the added equipment affect the centre of gravity of the UAV the tabular method of the centre of gravity calculation was used. The results of the existing work on the project are location and attaching of the equipment to the unmanned vehicle, balance of the unmanned vehicle, solutions of the problems coming into being during the testing and design of the equipment protection against unfavourable effects.

  19. Sexchikane kan og skal bekæmpes

    DEFF Research Database (Denmark)

    Holt Larsen, Henrik

    2016-01-01

    Inden for det seneste år har vi set en voldsom opblomstring i interessen og bekymringen for begrebet seksuel chikane. Vi hører om det i storbyernes natteliv. Donald Trump berettede i den amerikanske præsidentvalgkamp åbenhjertigt om, hvor på kroppen han må befalme eller kysse en kvinde, fordi han...

  20. Report on equipment availability for the ten-year period, 1966--1975

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This is an annual report of availability and outage statistics for electric power generating facilities operating in the United States. A list of utility organizations voluntarily participating in the EEI Equipment Availability Program in 1975 is located in Appendix F. All summary reports in this publication are for the 10-year period 1966-1975. Each reporting utility company has received reports on individual units for which data were submitted. Also, selected major equipment manufacturers receive copies of computer reports showing an analysis of the data for their equipment. Revised reporting instructions to incorporate Safety and Environmental Requirement Cause Codes were issued effective January 1, 1976. In addition, provisions were made for identifying major equipment manufactured outisde of the United States or under foreign license. Recognizing that an Annual Report contains only a limited amount of general outage data in selected categories, the Task Force has agreed to perform special analyses of the data bank if the cost of computer services is met by the requestor and if the required analysis conforms to some designated policy guidelines.

  1. Safety requirements and feedback of commonly used material handling equipment

    International Nuclear Information System (INIS)

    Pathak, M.K.

    2009-01-01

    Different types of cranes, hoists, chain pulley blocks are the most commonly used material handling equipment in industry along with attachments like chains, wire rope slings, d-shackles, etc. These equipment are used at work for transferring loads from one place to another and attachments are used for anchoring, fixing or supporting the load. Selection of the correct equipment, identification of the equipment planning of material handling operation, examination/testing of the equipment, education and training of the persons engaged in operation of the material handling equipment can reduce the risks to safety of people in workplace. Different safety systems like boom angle indicator, overload tripping device, limit switches, etc. should be available in the cranes for their safe use. Safety requirement for safe operation of material handling equipment with emphasis on different cranes and attachments particularly wire rope slings and chain slings have been brought out in this paper. An attempt has also been made to bring out common nature of deficiencies observed during regulatory inspection carried out by AERB. (author)

  2. Program outline of seismic fragility capacity tests on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Lijima, T.; Abe, H.; Fujita, T.

    2004-01-01

    A seismic probabilistic safety assessment (PSA) is an available method to evaluate residual risk of nuclear plant that is designed with definitive seismic design condition. Seismic fragility capacity data are necessary for seismic PSA, but we don't have sufficient data of active components of nuclear plants in Japan. This paper describes a plan of seismic fragility capacity tests on nuclear power plant equipment. The purpose of those tests is to obtain seismic fragility capacity of important equipment from a safety design point of view. And the equipment for the fragility capacity tests were selected considering effect on core damage frequency (CDF) that was evaluated by our preliminary seismic PSA. Consequently horizontal shaft pump, electric cabinets, Control Rod Drive system (CRD system) of BWR and PWR plant and vertical shaft pump were selected. The seismic fragility capacity tests are conducted from phase-1 to phase-3, and horizontal shaft pump and electric cabinets are tested on phase-1. The fragility capacity test consists of two types of tests. One is actual equipment test and another is element test. On actual equipment test, a real size model is tested with high-level seismic motion, and critical acceleration and failure mode are investigated. Regarding fragility test phase-1, we selected typical type horizontal shaft pump and electric cabinets for the actual equipment test. Those were Reactor Building Closed Cooling Water (RCW) Pump and eight kinds of electric cabinets such as relay cabinet, motor control center. On the test phase-1, maximum input acceleration for the actual equipment test is intended to be 6-G-force. Since the shaking table of TADOTSU facility did not have capability for high acceleration, we made vibration amplifying system. In this system, amplifying device is mounted on original shaking table and it moves in synchronization with original table. The element test is conducted with many samples and critical acceleration, median and

  3. Personal protective equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This Practical Radiation Technical Manual is one of a series that has been designed to provide guidance on radiological protection for employers, radiation protection officers, managers and other technically competent persons who have responsibility for ensuring the safety of employees working with ionizing radiation. The Manual may be used with the appropriate IAEA Practical Radiation Safety Manuals to provide training, instruction and information for all employees engaged in work with ionizing radiation. Personal protective equipment (PPE) includes clothing or other special equipment that is issued to individual workers to provide protection against actual or potential exposure to ionizing radiations. It is used to protect each worker against the prevailing risk of external or internal exposure in circumstances in which it is not reasonably practicable to provide complete protection by means of engineering controls or administrative methods. Adequate personal protection depends on PPE being correctly selected, fitted and maintained. Appropriate training for the users and arrangements to monitor usage are also necessary to ensure that PPE provides the intended degree of protection effectively. This Manual explains the principal types of PPE, including protective clothing and respiratory protective equipment (RPE). Examples of working procedures are also described to indicate how PPE should be used within a safe system of work. The Manual will be of most benefit if it forms part of a more comprehensive training programme or is supplemented by the advice of a qualified expert in radiation protection. Some of the RPE described in this Manual should be used under the guidance of a qualified expert

  4. The Effectiveness of Seismic Isolation System for Nuclear Equipment

    International Nuclear Information System (INIS)

    Kim, Min-Kyu; Choun, Young-Sun; Seo, Jeong-Moon

    2005-04-01

    In this study, the Emergency Diesel Generator and Off-site Transformer were selected for isolation. For the selection of the most suitable base isolation system, the literature review and the numerical analysis were performed. For the decision of the parameter of isolation system, the sensitivity analysis was performed. Finally the conceptual design of each equipment was performed. In case of EDG, the Coil Spring and Viscous Damper system was selected for isolation system and 45% isolation effect was determined. For the OST, the FPS was selected and 69% isolation effect was determined

  5. The Effectiveness of Seismic Isolation System for Nuclear Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Min-Kyu; Choun, Young-Sun; Seo, Jeong-Moon

    2005-04-15

    In this study, the Emergency Diesel Generator and Off-site Transformer were selected for isolation. For the selection of the most suitable base isolation system, the literature review and the numerical analysis were performed. For the decision of the parameter of isolation system, the sensitivity analysis was performed. Finally the conceptual design of each equipment was performed. In case of EDG, the Coil Spring and Viscous Damper system was selected for isolation system and 45% isolation effect was determined. For the OST, the FPS was selected and 69% isolation effect was determined.

  6. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  7. How Do I Know? A Guide to the Selection of Personal Protective Equipment for Use in Responding to A Release of Chemical Warfare Agents

    Energy Technology Data Exchange (ETDEWEB)

    Foust, C.B.

    1999-05-01

    An incident involving chemical warfare agents requires a unique hazardous materials (HAZMAT) response. As with an HAZMAT event, federal regulations prescribe that responders must be protected from exposure to the chemical agents. But unlike other HAZMAT events, special considerations govern selection of personal protective equipment (PPE). PPE includes all clothing, respirators and monitoring devices used to respond to a chemical release. PPE can differ depending on whether responders are military or civilian personnel.

  8. Investigação da Oferta de Crédito para Micro e Pequenas Empresas no Estado de Minas Gerais: uma abordagem por grupos estratégicosSupply of Credit Investigation into Micro and Small Enterprises in the Minas Gerais State: an approach by strategic groupsInvestigación de la Oferta de Crédito para Micro y Pequeñas Empresas en el Estado de Minas Gerais: un enfoque por grupos estratégicos

    Directory of Open Access Journals (Sweden)

    SILVEIRA, Suely de Fátima Ramos

    2009-06-01

    Full Text Available RESUMOApesar do evidente crescimento da oferta de microcrédito no Brasil e no Estado de Minas Gerais, pouco se sabe sobre os aspectos fundamentais à manutenção e fomento desta iniciativa. Assim, o presente trabalho foi conduzido com o objetivo de identificar e analisar as características de grupos estratégicos de instituições ofertantes de crédito, descrevendo o perfil desses grupos de acordo com premissas do microcrédito produtivo, tomando como referência o Estado de Minas Gerais. A pesquisa teve caráter exploratório e descritivo, com abordagem quantitativa e qualitativa, abrangendo 81 instituições ofertantes de crédito que, por meio de análise fatorial seguida de análise de cluster, resultou na identificação de três grupos com características distintas quanto à propagação do crédito para as MPEs: Focado, Disperso e Desfocado. Os resultados mostraram que apenas 9% dos ofertantes concedem vantagens às MPEs pertinentes às metodologias de aplicação do microcrédito. Por outro lado, sabe-se que a maioria das instituições, na área em estudo não concede vantagens específicas às MPEs. Sendo que essas, por sua vez, recorrem com baixa frequência às operações de crédito, prejudicando o desenvolvimento deste setor, tendo em vista a assimetria entre a oferta e demanda de microcrédito.ABSTRACTDespite the evident increase of the microcredit supply in Brazil and Minas Gerais State, there is a need for knowledge on the fundamental aspects of the maintenance and incentive to this initiative. So, this work was conducted to identify and analyze characteristics of strategic groups in the supplying credit institutions, by summarizing the profile of those institutions under the viewpoint of the productive microcredit premises suppositions considering the Minas Gerais State as reference. This was an exploratory and descriptive research with both quantitative and qualitative approach, including 81 supplying credit institutions

  9. Design aspects of the Alpha Repository. I. Preliminary results of facility layout, room stability, and equipment selection efforts. Summary progress report RSI-0024

    International Nuclear Information System (INIS)

    Gnirk, P.F.; Grams, W.H.; Zeller, T.J.; Ellis, D.B.; Pariseau, W.G.; Fossum, A.F.; Ratigan, J.L.; Hansen, F.D.

    1975-01-01

    Results of preliminary analysis of the stability of mines in salt formations underlying Eddy and Lea Counties in New Mexico are presented. Methods and equipment for drilling canister emplacement holes in these formations were evaluated along with methods for excavating storage areas and transport of the excavated salt. Progress during the period is reported in chapters on geological and rock properties at the repository site, preliminary mine layout, basic requirements for repository usage, excavation geometries, drill selection, excavation systems, and safety requirements

  10. TDRSS S-shuttle unique receiver equipment

    Science.gov (United States)

    Weinberg, A.; Schwartz, J. J.; Spearing, R.

    1985-01-01

    Beginning with STS-9, the Tracking and Date Relay Satellite system (TDRSS) will start providing S- and Ku-band communications and tracking support to the Space Shuttle and its payloads. The most significant element of this support takes place at the TDRSS White Sands Ground Terminal, which processes the Shuttle return link S- and Ku-band signals. While Ku-band hardware available to other TDRSS users is also applied to Ku-Shuttle, stringent S-Shuttle link margins have precluded the application of the standard TDRSS S-band processing equipment to S-Shuttle. It was therfore found necessary to develop a unique S-Shuttle Receiver that embodies state-of-the-art digital technology and processing techniques. This receiver, developed by Motorola, Inc., enhances link margins by 1.5 dB relative to the standard S-band equipment and its bit error rate performance is within a few tenths of a dB of theory. An overview description of the Space Shuttle Receiver Equipment (SSRE) is presented which includes the presentation of block diagrams and salient design features. Selected, measured performance results are also presented.

  11. Multi-echelon Repair Inventory Systems: Select Issues in Modular Electronic Equipment

    OpenAIRE

    Amik Garg; S. G. Deshmukh

    2010-01-01

    Flow of modules/printed circuit boards (PCBs) in a multi-echelon repair inventory system pertaining to modular electronic equipment for large maintenance organisations having large inventory in range and depth, like defence has been critically examined using a case study. Desirable features of the proposed system are identified and a general framework suggested for examining its feasibility and implementation in an organisation. An analytical model with an objective to reduce number of echelo...

  12. IDENTIDADE ORGANIZACIONAL E SUAS INFLUÊNCIAS NA GESTÃO DE PESSOAS DAS MICRO E PEQUENAS EMPRESAS

    OpenAIRE

    Denilson Aparecida Leite Freire

    2016-01-01

    O objetivo deste estudo foi analisar qual a relação que se estabelece entre a percepção do proprietário das MPEs e as práticas de gestão de pessoas adotadas nas micro e pequenas empresas (MPEs). Para análise da percepção foi utilizada o construto de Identidade Organizacional (IO), nas suas dimensões normativa (estratégia Soft) e utilitária (estratégia Hard). Para análise das estratégias de gestão de pessoas foi utilizado o construto Sistemas de Trabalho de Alto Envolvimento (STAE). Foi realiz...

  13. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  14. An optimization tool for satellite equipment layout

    Science.gov (United States)

    Qin, Zheng; Liang, Yan-gang; Zhou, Jian-ping

    2018-01-01

    Selection of the satellite equipment layout with performance constraints is a complex task which can be viewed as a constrained multi-objective optimization and a multiple criteria decision making problem. The layout design of a satellite cabin involves the process of locating the required equipment in a limited space, thereby satisfying various behavioral constraints of the interior and exterior environments. The layout optimization of satellite cabin in this paper includes the C.G. offset, the moments of inertia and the space debris impact risk of the system, of which the impact risk index is developed to quantify the risk to a satellite cabin of coming into contact with space debris. In this paper an optimization tool for the integration of CAD software as well as the optimization algorithms is presented, which is developed to automatically find solutions for a three-dimensional layout of equipment in satellite. The effectiveness of the tool is also demonstrated by applying to the layout optimization of a satellite platform.

  15. Electronic detecting equipment in the Camac standard

    International Nuclear Information System (INIS)

    Basiladze, S.G.

    1981-01-01

    Basic tends of development of electron detecting equipment of modern facilities for experiments in nuclear physics are considered. Special attention is paid to developments of specialized hybrid integrated circuits, specialized processors for selection of events, usage of integrated circuits of memories in detecting units as well as to prospects of developing nuclear electronics standards [ru

  16. Sodium cleaning device for nuclear reactor equipments

    International Nuclear Information System (INIS)

    Fujisawa, Morio.

    1985-01-01

    Purpose: To enable sodium cleaning over the entire length of large size equipments such as control rod drives and primary coolant recycling pumps for use in FBR type reactors. Constitution: A plurality of warm water supply nozzles each having a valve are connected at varying height on the side of a cleaning tank, to which an exhaust line is connected. These nozzles are connected with an exhaust port at the bottom of the tank to constitute a pipeway for cleaning warm water recycling line including a water feed pump and a feedwater heater. The water level in the tank is changed stepwise by successively selecting the warm water feed nozzles. Further, the warm water in the tank is recyclically fed through the nozzles selected at each step of the water level through the recycle line while warming. On the other hand, the pressure inside the tank is reduced through the exhaust line, whereby the warm water in the tank is boiled at low temperature to clean-up sodium on the equipments to be cleaned over the entire length. (Horiuchi, T.)

  17. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  18. Electrical equipment performance under severe accident conditions (BWR/Mark 1 plant analysis): Summary report

    International Nuclear Information System (INIS)

    Bennett, P.R.; Kolaczkowski, A.M.; Medford, G.T.

    1986-09-01

    The purpose of the Performance Evaluation of Electrical Equipment during Severe Accident States Program is to determine the performance of electrical equipment, important to safety, under severe accident conditions. In FY85, a method was devised to identify important electrical equipment and the severe accident environments in which the equipment was likely to fail. This method was used to evaluate the equipment and severe accident environments for Browns Ferry Unit 1, a BWR/Mark I. Following this work, a test plan was written in FY86 to experimentally determine the performance of one selected component to two severe accident environments

  19. Optical system for UV-laser technological equipment

    Science.gov (United States)

    Fedosov, Yuri V.; Romanova, Galina E.; Afanasev, Maxim Ya.

    2017-09-01

    Recently there has been an intensive development of intelligent industrial equipment that is highly automated and can be rapidly adjusted for certain details. This equipment can be robotics systems, automatic wrappers and markers, CNC machines and 3D printers. The work equipment considered is the system for selective curing of photopolymers using a UV-laser and UV-radiation in such equipment that leads to additional technical difficulties. In many cases for transporting the radiation from the laser to the point processed, a multi-mirror system is used: however, such systems are usually difficult to adjust. Additionally, such multi-mirror systems are usually used as a part of the equipment for laser cutting of metals using high-power IR-lasers. For the UV-lasers, using many mirrors leads to crucial radiation losses because of many reflections. Therefore, during the development of the optical system for technological equipment using UV-laser we need to solve two main problems: to transfer the radiation for the working point with minimum losses and to include the system for controlling/handling the radiation spot position. We introduce a system for working with UV-lasers with 450mW of power and a wavelength of 0.45 μm based on a fiber system. In our modelling and design, we achieve spot sizes of about 300 μm, and the designed optical and mechanical systems (prototypes) were manufactured and assembled. In this paper, we present the layout of the technological unit, the results of the theoretical modelling of some parts of the system and some experimental results.

  20. Space station wardroom habitability and equipment study

    Science.gov (United States)

    Nixon, David; Miller, Christopher; Fauquet, Regis

    1989-01-01

    Experimental designs in life-size mock-up form for the wardroom facility for the Space Station Habitability Module are explored and developed. In Phase 1, three preliminary concepts for the wardroom configuration are fabricated and evaluated. In Phase 2, the results of Phase 1 are combined with a specific range of program design requirements to provide the design criteria for the fabrication of an innovative medium-fidelity mock-up of a wardrobe configuration. The study also focuses on the design and preliminary prototyping of selected equipment items including crew exercise compartments, a meal/meeting table and a portable workstation. Design criteria and requirements are discussed and documented. Preliminary and final mock-ups and equipment prototypes are described and illustrated.

  1. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  2. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  3. Equipment for data transmission from scintillation detectors and motion scintiaraph to multichannel analyzer or computer

    International Nuclear Information System (INIS)

    Runczik, I.; Cernoch, V.

    1981-01-01

    The patent is claimed for the connection of the equipment. By its positional output the data selection circuit is connected to the input of a program counter and by its time output to the input of a time analyzer. A pulse tape recorder is connected to the input of the selection circuit. The equipment may be used off-line and on-line. In the on-line mode the data are fed directly to the selection circuit, in the off-line mode they are recorded on a tape of the pulse tape recorder and then fed to the selection data circuit. The selection data circuit classifies data into time and positional depending on the type of information. Control circuits increase the reliability of data transmission. (J.P.)

  4. The Difficult Airway Society 'ADEPT' guidance on selecting airway devices: the basis of a strategy for equipment evaluation.

    Science.gov (United States)

    Pandit, J J; Popat, M T; Cook, T M; Wilkes, A R; Groom, P; Cooke, H; Kapila, A; O'Sullivan, E

    2011-08-01

    Faced with the concern that an increasing number of airway management devices were being introduced into clinical practice with little or no prior evidence of their clinical efficacy or safety, the Difficult Airway Society formed a working party (Airway Device Evaluation Project Team) to establish a process by which the airway management community within the profession could itself lead a process of formal device/equipment evaluation. Although there are several national and international regulations governing which products can come on to the market and be legitimately sold, there has hitherto been no formal professional guidance relating to how products should be selected (i.e. purchased). The Airway Device Evaluation Project Team's first task was to formulate such advice, emphasising evidence-based principles. Team discussions led to a definition of the minimum level of evidence needed to make a pragmatic decision about the purchase or selection of an airway device. The Team concluded that this definition should form the basis of a professional standard, guiding those with responsibility for selecting airway devices. We describe how widespread adoption of this professional standard can act as a driver to create an infrastructure in which the required evidence can be obtained. Essential elements are that: (i) the Difficult Airway Society facilitates a coherent national network of research-active units; and (ii) individual anaesthetists in hospital trusts play a more active role in local purchasing decisions, applying the relevant evidence and communicating their purchasing decisions to the Difficult Airway Society. © 2011 The Authors. Anaesthesia © 2011 The Association of Anaesthetists of Great Britain and Ireland.

  5. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  6. IEEE recommended practices for seismic qualification of Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The IEEE has developed this document to provide direction for developing programs to seismically qualify Class 1E equipment for nuclear power generating stations. It supplements IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for equipment qualification. The Class 1E equipment to be qualified by produres or standards established by this document are of many forms, characteristics, and materials; therefore, the document presents many acceptable methods with the intent of permitting the user to make a judicious selection from among the various options. In making such a selection, the user should choose those that best meet a particular equipment's requirements. Further, in using this document as a specification for the purchase of equipment, the many options should also be recognized and the document invoked accordingly. It is recommended that the need for specific standards for the seismic qualifiction of particular kinds of equipment be evaluated by those responsible for such documents and that consideration be given to the application of particular methods from these documents which are most suitable

  7. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  8. Hydroelectric plants: economical and ecological consequences of equipment and exploitation variants

    International Nuclear Information System (INIS)

    Maire, P.; Bansard, J.F.; Do, T.

    1995-01-01

    The increasing number of renewal demands for hydroelectric plants authorizations has raised the question of the pertinency and efficiency of the equipments used. Choices are rarely clearly justified by the petitioners. After reminding the reasons and consequences of a given choice and equipment, the necessary steps of an authorization demand are illustrated by a concrete case. It shows that some equipment-management combinations can lead to a more satisfying economical and ecological balance-sheet than those generally proposed. The popularization of computer use allows the examining services to dispose of clear and pedagogical elements to select the regular choices. (J.S.). 10 refs., 11 figs., 2 tabs

  9. Overexposure of patients due to malfunctions or defects in radiation equipment

    International Nuclear Information System (INIS)

    Gill, J.R.

    1992-01-01

    Some 38 incidents involving patient overexposure due to malfunctions or defects in radiation equipment were notified to HSE between 1986 and 1990. Of these cases, 30 involved diagnostic X ray equipment, while the remainder involved nuclear medicine or radiotherapy equipment. Those cases involving X ray equipment are examined in detail and grouped into six categories. The numbers of patients affected varied. In one case an estimated 350 patients were affected: in another, 240; while 13 cases affected only a single patient. A very rough estimate of the collective effective dose equivalent in the 30 cases comes to 5 man sieverts. It is concluded that improvements are needed in fault finding procedures, and guidance is needed on consistent methods of dose estimation and reporting. Improvements for the longer term include the selection of reliable components during manufacture; application of HSE guidance in software design for programmable electronic systems; and equipment design to incorporate fault detection and inhibition of operation to prevent excessive exposures

  10. The role of lubricant analysis in maximizing lubricant and equipment life

    International Nuclear Information System (INIS)

    Janis, J.

    1995-01-01

    Lubricant analysis has always played an important yet somewhat invisible role in equipment health monitoring. At its most primitive, simple observations and field testing alert equipment operators to changing conditions. At its most advanced, data from performance and analytical tests are used to develop or select optimum lubricants for service, stretch drain intervals, predict remaining equipment life and identify potential equipment or system problems at an incipient stage. Coupled with thermography and vibration analysis, lubricant analysis can become a major component of a comprehensive predictive maintenance (PM) program. Ontario Hydro finds itself at a turning point regarding the use and monitoring of lubricants. Increasing emphasis on equipment reliability and plant life extension, coupled with major, recent changes in lubricant composition in response to environmental, energy and safety concerns, forces an upgrading of many aspects of lubricant monitoring so that it may establish itself as a key part of modern PM practices. This paper discusses some of these aspects. (author)

  11. Recommendations for managing equipment aging in nuclear power plants

    International Nuclear Information System (INIS)

    Gunther, W.E.; Subudhi, M.; Aggarwal, S.K.

    1992-01-01

    Research conducted under the auspices of the US NRC's Nuclear Plant Aging Research (NPAR) Program has resulted in a large database of component and system operating, maintenance, and testing information. This database has been used to determine the susceptibility to aging of selected components, and the potential for equipment aging to impact plant safety and availability. it has also identified methods for detecting and mitigating component and system aging. This paper describes the research recommendations on electrical components which could be applied to maintenance, testing, and inspection activities to detect and mitigate the effects of aging prior to equipment failures

  12. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  13. Mast cells mediate malignant pleural effusion formation.

    Science.gov (United States)

    Giannou, Anastasios D; Marazioti, Antonia; Spella, Magda; Kanellakis, Nikolaos I; Apostolopoulou, Hara; Psallidas, Ioannis; Prijovich, Zeljko M; Vreka, Malamati; Zazara, Dimitra E; Lilis, Ioannis; Papaleonidopoulos, Vassilios; Kairi, Chrysoula A; Patmanidi, Alexandra L; Giopanou, Ioanna; Spiropoulou, Nikolitsa; Harokopos, Vaggelis; Aidinis, Vassilis; Spyratos, Dionisios; Teliousi, Stamatia; Papadaki, Helen; Taraviras, Stavros; Snyder, Linda A; Eickelberg, Oliver; Kardamakis, Dimitrios; Iwakura, Yoichiro; Feyerabend, Thorsten B; Rodewald, Hans-Reimer; Kalomenidis, Ioannis; Blackwell, Timothy S; Agalioti, Theodora; Stathopoulos, Georgios T

    2015-06-01

    Mast cells (MCs) have been identified in various tumors; however, the role of these cells in tumorigenesis remains controversial. Here, we quantified MCs in human and murine malignant pleural effusions (MPEs) and evaluated the fate and function of these cells in MPE development. Evaluation of murine MPE-competent lung and colon adenocarcinomas revealed that these tumors actively attract and subsequently degranulate MCs in the pleural space by elaborating CCL2 and osteopontin. MCs were required for effusion development, as MPEs did not form in mice lacking MCs, and pleural infusion of MCs with MPE-incompetent cells promoted MPE formation. Once homed to the pleural space, MCs released tryptase AB1 and IL-1β, which in turn induced pleural vasculature leakiness and triggered NF-κB activation in pleural tumor cells, thereby fostering pleural fluid accumulation and tumor growth. Evaluation of human effusions revealed that MCs are elevated in MPEs compared with benign effusions. Moreover, MC abundance correlated with MPE formation in a human cancer cell-induced effusion model. Treatment of mice with the c-KIT inhibitor imatinib mesylate limited effusion precipitation by mouse and human adenocarcinoma cells. Together, the results of this study indicate that MCs are required for MPE formation and suggest that MC-dependent effusion formation is therapeutically addressable.

  14. The potential of mangosteen (Garcinia mangostana peel extract, combined with demineralized freeze-dried bovine bone xenograft, to reduce ridge resorption and alveolar bone regeneration in preserving the tooth extraction socket

    Directory of Open Access Journals (Sweden)

    Utari Kresnoadi

    2017-01-01

    Conclusion: The induction of MPEs and DFBBX is effective in reducing inflammation, lowering osteoclasts, decreasing alveolar bone resorption, and also increasing BMP2 expression and alveolar bone regeneration.

  15. Thermo Techno Modern Analytical Equipment for Research and Industrial Laboratories

    Directory of Open Access Journals (Sweden)

    Khokhlov, S.V.

    2014-03-01

    Full Text Available A brief overview of some models of Thermo Techno analytical equipment and possible areas of their application is given. Thermo Techno Company was created in 2000 as a part of representative office of international corporation Thermo Fisher Scientific — world leader in manufacturing analytical equipments. Thermo Techno is a unique company in its integrated approach in solving the problems of the user, which includes a series of steps: setting the analytical task, selection of effective analysis methods, sample delivery and preparation as well as data transmitting and archiving.

  16. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  17. Experience in testing and inspection and maintenance of material handling equipments

    International Nuclear Information System (INIS)

    Sharma, M.L.

    2009-01-01

    All the Industries, Power Projects/Stations, Organizations engaged in the field of process of manufacturing, power generation, transportation, design, layout, manufacturing, and supply have to utilize material handling equipment, machinery tools tackles, lifting gears for performing their tasks/activities. The major role of the material handling equipments play an important role and a component of 40% of the total activities of the system/process to achieve targeted output with the reliability and quality is performed by material handling equipment and machineries. The material handling equipment shall have to be chosen/selected to suit the process requirement at times to be specifically designed inspected and tested to meet the specific requirement. These equipment/machineries/lifting gears have to undergo for the periodical inspection and testing to qualify for further use in a specified period. All those equipment and machinery to be used for material handling if not found satisfactory during inspection and testing or otherwise also shall be dismantled/stripped to the extent of inspection requirement of the components/sub components and maintenance repair shall have to be done to make them worthy for reuse after testing and inspection duly witnessed by competent authority

  18. Determining the productivity of frontal-selective excavation equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baikenzhin, A E; Ermekov, T E

    1979-01-01

    The engineering parameters of the VMF-2 frontal-selective excavation machine are given. Calculation formulae are given for determining the feed speed of the working tool relative to the difference in the motion of the arm of the working tool and the feed speed of the hydraulic jack lifter. A methodology is developed for calculating the productivity of the excavator depending on various engineering conditions, accounting for modifications in its design.

  19. Fiscal 1998 survey report. Welfare equipment (Development of human friendly care support intelligent equipment / Development of home welfare equipment system); 1998 nendo chosa hokokusho. Fukushi kiki (human friendly kaigo shien chino kiki kaihatsu / zaitaku fukushi kiki system kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Since disabled persons increase with a progress of an aging society, while a care power decreases with a decrease in birth rate, development and practical use of the welfare equipment contributing to self-support of aged and handicapped persons, reduction of doctors' or therapists' burdens, and as a result, reduction of medical care costs are desirable. Among them, R and D and practical use are expected of the advanced welfare equipment and system based on human engineering technology contributing to improvement of lives of aged and handicapped persons, and support of nurses and cares of disabled persons. In fiscal 1998, on both human friendly care support intelligent equipment and home welfare equipment system, this project clarified essential technical issues based on the future view, selected some themes to be newly developed in the future, and surveyed and evaluated the details of their R and D concretely. For the former, 'heart disease diagnosis and treatment total support system,' and for the latter, 'body function rehabilitation support system' were surveyed. (NEDO)

  20. 40 CFR 1068.435 - May I sell engines/equipment from a family with a suspended certificate of conformity?

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS Selective Enforcement Auditing § 1068.435 May I sell engines/equipment from a family with a... of equipment you produce and show it complies with emission standards that apply. (b) We...

  1. Stand, Harvest, and Equipment Interactions in Simulated Harvesting Prescriptions

    Science.gov (United States)

    Jingxin Wang; W. Dale Greene; Bryce J. Stokes

    1998-01-01

    We evaluated potential interactions of stand type, harvesting method, and equipment in an experiment using interactive simulation. We examined three felling methods (chain saw, feller-buncher, harvester) and two extraction methods (grapple skidder and forwarder) performing clearcuts, sheltenvood cuts, and single-tree selection cuts in both an uneven-aged natural stand...

  2. Proceedings of the 11. annual mining industry learning seminar : 2006 equipment evolutions

    Energy Technology Data Exchange (ETDEWEB)

    Joseph, T. [Alberta Univ., Edmonton, AB (Canada). School of Mining and Petroleum Engineering] (comp.)

    2006-07-01

    This seminar provided a forum for mine engineers, geologists, operators, vendors and academics to discuss various topics on equipment evolution that address mining industry concerns. Participants included those who are involved in mine planning, equipment selection, operations and maintenance. The presentations identified possible solutions to ongoing issues and alternative technologies emerging in the mining industry. Operators and original equipment manufacturers shared their innovations in novel developments and presented solutions to issues relevant to mining processes including truck and shovel technology issues such as tires, lube and fuel emissions. The seminar featured 17 presentations, of which 5 have been catalogued separately for inclusion in this database. tabs., figs.

  3. Verification of the thermal design of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hienonen, R.; Karjalainen, M.; Lankinen, R. [VTT Automation, Espoo (Finland). ProTechno

    1997-12-31

    The project `Verification of the thermal design of electronic equipment` studied the methodology to be followed in the verification of thermal design of electronic equipment. This project forms part of the `Cool Electronics` research programme funded by TEKES, the Finnish Technology Development Centre. This project was carried out jointly by VTT Automation, Lappeenranta University of Technology, Nokia Research Center and ABB Industry Oy VSD-Technology. The thermal design of electronic equipment has a significant impact on the cost, reliability, tolerance to different environments, selection of components and materials, and ergonomics of the product. This report describes the method for verification of thermal design. It assesses the goals set for thermal design, environmental requirements, technical implementation of the design, thermal simulation and modelling, and design qualification testing and the measurements needed. The verification method covers all packaging levels of electronic equipment from the system level to the electronic component level. The method described in this report can be used as part of the quality system of a corporation. The report includes information about the measurement and test methods needed in the verification process. Some measurement methods for the temperature, flow and pressure of air are described. (orig.) Published in Finnish VTT Julkaisuja 824. 22 refs.

  4. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  5. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  6. Optimal facility and equipment specification to support cost-effective recycling

    International Nuclear Information System (INIS)

    Redus, K.S.; Yuracko, K.L.

    1998-01-01

    The authors demonstrate a project management approach for D and D projects to select those facility areas or equipment systems on which to concentrate resources so that project materials disposition costs are minimized, safety requirements are always met, recycle and reuse goals are achieved, and programmatic or stakeholder concerns are met. The authors examine a facility that contains realistic areas and equipment, and they apply the approach to illustrate the different results that can be obtained depending on the strength or weakness of safety risk requirements, goals for recycle and reuse of materials, and programmatic or stakeholder concerns

  7. Technology assessment of long distance liquid natural gas pipelines. Phase 9. Available and/or required equipment

    Energy Technology Data Exchange (ETDEWEB)

    1977-02-01

    This phase of the technology assessment of liquid natural gas pipelines assembles a listing of the materials and equipment which might be used to mechanically build an LNG pipeline. It lists material and equipment which practically could be used in such a pipeline either at a present state of the art, or by adaptation in terms of materials or techniques, or after some development work. Other than that the material and equipment is proposed for use in an LNG pipeline, no new real concept of pipeline or refrigeration plant equipment is proposed. Rather the equipment has been selected so as to conform as closely as possible to established pipeline practice.

  8. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  9. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  10. Information system for selection of conditions and equipment for the cultivation of mammalian cells

    Directory of Open Access Journals (Sweden)

    D. R. Batyrgazieva

    2017-01-01

    Full Text Available The use of mammals cells and their products wide application, so the actual problem is a creation of an information system in the field of their cultivation for the organizing and structuring of information on process experimental data. This work is devoted the analysis of mammalian cell cultivation. The main technologies of cell cultivation, necessary equipment and matrices are considered. The main stages of database design and information system is described. The justification of software products are provided and the results of the database and information system implementation are done. The detailed description of all modules of the system, as well as a comparative analysis of the results of the search are in the system to verify correct operation of the system. The scientific and practical significance of the work lies in the fact that the effective tool for presenting knowledge and data for search by specific parameters is required. The convenience of the system is that it is not necessary to address in various data sources to get and conditions of cultivation of mammalian cells, it has already been collected and structured according to parameters. With help of the system, it is possible to select conditions for the cultivation of mammalian cells at the stage of scientific researches that will significantly reduce the time and cost of work, also to rank of recommended technological and hardware solutions. The system has a functional completeness, i.e. in a specific subject area, it ensures the fulfillment of user's requirements, and allows to accumulate and process information.

  11. Waste Handling Equipment Development Test and Evaluation Study

    International Nuclear Information System (INIS)

    R.L. Tome

    1998-01-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M and O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T and EP), Reference 5.1, was used as a basis for this study. The MGR T and EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T and EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T and EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  12. Optimal Lease Contract for Remanufactured Equipment

    Science.gov (United States)

    Iskandar, B. P.; Wangsaputra, R.; Pasaribu, U. S.; Husniah, H.

    2018-03-01

    In the last two decades, the business of lease products (or equipment) has grown significantly, and many companies acquire equipment through leasing. In this paper, we propose a new lease contract under which a product (or equipment) is leased for a period of time with maximum usage per period (e.g. 1 year). This lease contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the customer (as a lessee) will be charged an additional cost. In general, the lessor (OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. It is considered that the lessor offers the lease contract for a remanufactured product. We presume that the price of the lease contract for the remanufactured product is much lower than that of a new one, and hence it would be a more attractive option to the customer. The decision problem for the lessee is to select the best option offered that fits to its requirement, and the decision problem for the lessor is find the optimal maintenance efforts for a given price of the lease option offered. We first find the optimal decisions independently for each party, and then the joint optimal decisions for both parties.

  13. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  14. Recycling-oriented characterization of small waste electrical and electronic equipment

    International Nuclear Information System (INIS)

    Chancerel, Perrine; Rotter, Susanne

    2009-01-01

    As a result of the continuous change in the design and function of consumer electrical and electronic products, the mechanical and material properties of the obsolete products, called waste electric and electronic equipment (WEEE), are highly variable. The variability within WEEE is explained by the number of different appliances, and the heterogeneity in composition of any given appliance. This paper reports on an extended investigation of the properties of WEEE, in particular small appliances. The investigation focuses on the analysis of the composition of about 700 single appliances. Firstly, analytical methods to characterize the waste equipment are described. The results of the experimental analyses show that the mechanical properties, the material composition, the polymer composition and the chemical composition of WEEE vary not only between equipment types with different functions, but also between single appliances within one equipment type. Data on hazardous and valuable substances in selected equipment types are presented. Using detailed data on the composition of individual appliances to calculate rates of recovery for assumed recycling processes demonstrates that the performance of recycling processes depends strongly on the composition of WEEE. Recycling-oriented characterization is, therefore, a systematic approach to support the design and the operation of recycling processes.

  15. Metabonomics by proton nuclear magnetic resonance in human pleural effusions: A route to discriminate between benign and malignant pleural effusions and to target small molecules as potential cancer biomarkers.

    Science.gov (United States)

    Zennaro, Lucio; Vanzani, Paola; Nicolè, Lorenzo; Cappellesso, Rocco; Fassina, Ambrogio

    2017-05-01

    Cytopathology is a noninvasive and cost-effective method for detecting cancer cells in pleural effusions (PEs), although in many cases, the diagnostic performance is hindered by the paucity of significant cells or the lack of clear morphological criteria. This study presents the results of an omics approach to improving the diagnostic performance of PE cytology. Metabolic profiling with proton nuclear magnetic resonance ( 1 H-NMR) was performed for 92 PEs (44 malignant cases of 8 different cancers and 48 benign cases of 7 nonneoplastic conditions). Light's criteria were used to further classify PEs as transudates or exudates, and 1 H-NMR spectroscopy was used to differentiate malignant pleural effusions (mPEs) from benign pleural effusions (bPEs). 1 H-NMR metabolic analysis showed clearly different spectra for mPEs and bPEs in the regions of the signals due to lipids, branched amino acids, and lactate, which were increased in mPEs. Transudates and exudates in bPEs were differentiated as well on the basis of the 1 H-NMR signals from lipids and lipoproteins, which were increased in exudates. Subject to validation in further larger studies, 1 H-NMR metabonomics could be an effective and reliable ancillary tool for PE investigations and diagnoses. Cancer Cytopathol 2017;125:341-348. © 2017 American Cancer Society. © 2017 American Cancer Society.

  16. A Materials and Equipment Review of Selected U.S. Geothermal District Heating Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, K D [P.E.

    0000-12-30

    Geothermal district heating systems are now quite common in the western U.S. A recent survey identified a total of 17 such systems. The performance of materials and equipment in 13 of these systems is reviewed in this paper. Specific areas covered include: production facilities, central plants, distribution, customer connection, metering and disposal. Those areas: characterized by the highest incidence of problems include: production well pumps, customer branch piping and energy metering.

  17. Equipment abnormality monitoring method and device therefor

    International Nuclear Information System (INIS)

    Yamada, Izumi; Asakura, Yamato; Uemura, Hiroshi; Uchida, Shunsuke; Oyamada, Osamu; Oyobe, Koji.

    1994-01-01

    In the present invention, it is judged whether the operation state of equipments used in a plant are normal or not by using learning performances. That is, a plurality of monitoring parameters are measured for an equipment. Previously determined monitoring parameters are extracted. A leaning mode or a monitoring mode is selected. In the leaning mode, based on the values of previously determined monitoring parameters, values of other monitoring parameters during normal states are learned. In the monitoring mode, based on the values of the previously determined monitoring parameters, typical values of other leaned monitoring parameters are outputted. The typical values of other normal monitoring parameters after learning and the values of other parameters at the present time are compared. If the values of the other parameters at the present time are out of normal range, it is judged as abnormal, and the result is alarmed and displayed. (I.S.)

  18. Excavating and loading equipment for peat mining

    Science.gov (United States)

    Mikhailov, A. V.; Zhigulskaya, A. I.; Yakonovskaya, T. B.

    2017-10-01

    Recently, the issues of sustainable development of Russian regions, related to ensuring energy security, are more urgent than ever. To achieve sustainable development, an integrated approach to the use of local natural resources is needed. Practically in all north regions of the Russian Federation, peat as a local natural resource is widespread, which has a practical application in the area of housing services. The paper presents the evaluation of technologies for open-pit peat mining, as well as analysis of technological equipment for peat production. Special attention is paid to a question of peat materials excavating and loading. The problem of equipment selection in a peat surface mine is complex. Many features, restrictions and criteria need to be considered. Use of low and ultra-low ground pressure excavators and low ground pressure front-end loaders with full-range tires to provide the necessary floatation in the peat bog environment is offered.

  19. Optimizing drilling performance using a selected drilling fluid

    Science.gov (United States)

    Judzis, Arnis [Salt Lake City, UT; Black, Alan D [Coral Springs, FL; Green, Sidney J [Salt Lake City, UT; Robertson, Homer A [West Jordan, UT; Bland, Ronald G [Houston, TX; Curry, David Alexander [The Woodlands, TX; Ledgerwood, III, Leroy W.

    2011-04-19

    To improve drilling performance, a drilling fluid is selected based on one or more criteria and to have at least one target characteristic. Drilling equipment is used to drill a wellbore, and the selected drilling fluid is provided into the wellbore during drilling with the drilling equipment. The at least one target characteristic of the drilling fluid includes an ability of the drilling fluid to penetrate into formation cuttings during drilling to weaken the formation cuttings.

  20. Playground Equipment Guide: For Teachers, Park and Recreation Directors, Parents, Youth Leaders, and Other Concerned Adults.

    Science.gov (United States)

    Consumer Product Safety Commission, Washington, DC.

    This guide was designed to assist parents, teachers, youth leaders, and park and recreation directors in the safe selection, use, installation, maintenance and repair of playground equipment. The nature and necessity of children's play are discussed briefly and information is presented on four main types of playground equipment: (1) swings, (2)…

  1. Planning of maintenance of electrical equipment in nuclear plants/laboratories [Paper No.: VB-3

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Bhattacharyya, A.K.

    1981-01-01

    Satisfactory operating performance of electrical systems ensures continuous availability of power to the various plants and machinery in nuclear plant and laboratories. For effective optimal functioning of the electrical equipment and to reduce their down time, scheduled planning of maintenance to the equipment is essential. Maintenance of power plant, nuclear or fossil, and industrial plant and research laboratories demands essential ingredients such as right type of trained and motivated technical personnel, adoption of standard procedures for maintenance, adequate safety and protection for equipment, safety procedures adopted in the installation to prevent hazards to the workers, provision of adequate stores and inventories, facilities for quick repairs and testing of equipment and effective planning of procedures for their maintenance. While breakdown maintenance allows equipment to operate before it is repaired or replaced, preventive maintenance makes use of scheduled inspection and periodical equipment overhaul and has little value for predicting future continuous performances of equipment. The engineered maintenance is most advantageous and offers maximum operating time to reduce down time of the equipment while adding predictive testing technique to aid in determining the frequency of overhaul of equipment. The important checks to be conducted and preventive maintenance programme to be scheduled are discussed in this paper. The safety and reliable functioning of the electrical equipment depend on proper optimal design, selection of equipment, their installation, subsequent maintenance and strict compliance with safety regulations. (author)

  2. Compressors selection and sizing

    CERN Document Server

    Brown, Royce N

    2005-01-01

    This practical reference provides in-depth information required to understand and properly estimate compressor capabilities and to select the proper designs. Engineers and students will gain a thorough understanding of compression principles, equipment, applications, selection, sizing, installation, and maintenance. The many examples clearly illustrate key aspects to help readers understand the ""real world"" of compressor technology.Compressors: Selection and Sizing, third edition is completely updated with new API standards. Additions requested by readers include a new section on di

  3. Patients Radiation Load Caused by Digitalised X-Ray Equipment

    International Nuclear Information System (INIS)

    Nikodemova, D.; Prikazska, M.; Horvathova, M.

    2001-01-01

    Full text: The radiation load of population all over the world from medical examinations clearly demonstrate the importance of implementation of quality assurance and quality control programmes into the activities of radiological departments. The basic aim of quality assurance programme is to ensure that the radiation dose is kept as low as reasonably practicable consistent with adequate image quality. As many other fields, the rapid development of techniques brought change-over from the conventional analogue technique to the digital technique. In this connection conventional X-ray film is being abandoned and images are being viewed on either laser film or monitor. The main advantages of using digital equipment lay in improved image quality and diagnostic accuracy through digital image processing, reduction in patient exposure, cost reduction by reduction film usage, more efficient storage and retrieval of radiographic images through picture archiving. Several studies that have been conducted for comparison of various diagnostic examinations performed on digital and analogue X-ray equipment have shown that in barium meal examinations, there is potential for dose saving in the digital image intensifier technique. The aim of this study was to compare measured values of dose-area product for colon investigations using different X-ray equipment types, on digital and one analogue. Our material consisted of 60 randomly selected patients, 24 of them were examined with digital equipment and 36 patients with the analogue equipment. (author)

  4. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  5. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  6. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  7. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  8. Locating of Rural Health Centers Equipped with Telehealth using GIS: A Case Study on Khorramabad City, Iran

    Directory of Open Access Journals (Sweden)

    Safdari Reza

    2016-10-01

    Full Text Available Residents of the rural and remote area always having limitations on accessing properly required service providers. In such condition, the establishment of rural health centers equipped with telehealth, and also the use of GIS for optimal site selection to the centers, would play an important role in facilitating the achievement of quality health services in desired time factor. This study intended to find the optimal sites for building the Rural Health Centers Equipped with remote health facilities in, Khorramabad City, using GIS. During the pilot study, we identified few effective locating criteria and sub-criteria for rural health centers equipped with telehealth, the priorities was also determined in that descriptive study. Further, we prepared a special layer for each criterion on the site selection, and by integrating such layers based on specified rules and patterns, about the spatial analysis , (like distance and density analysis were done. For such methods, we used Arc Map, Arc Catalog and Arc toolbox environments of Arc GIS (version 9.3. Finally, a map was prepared that indicated the possibility of appropriateness for establishing the centers in the study area. Considering a large number of areas, the research team selected the areas which were the appropriate location for build rural health centers which could be equipped with Telehealth.

  9. The proton therapy system for MGH's NPTC: equipment description and progress report

    International Nuclear Information System (INIS)

    Jongen, Y.; Beeckman, W.; Cohilis, P.

    1996-01-01

    At the beginning of 1994, the Massachusetts General Hospital (MGH) of the Harvard Medical School in Boston (MA, USA) a pioneer in proton therapy since 1959, selected a team led by Ion Beam Applications SA (IBA) to supply the proton therapy equipment of its new Northeast Proton Therapy Centre (NPTC),. The IBA integrated system includes a compact 235 MeV isochronous cyclotron, a short energy selection transforming the fixed energy beam extracted form the cyclotron into a variable energy beam, one or more isocentric gantries fitted with a nozzle, a system consisting of one or more horizontal beam lines, a global control system including an accelerator control unit and several independent but networked therapy control stations, a global safety management system, and a robotic patient positioning system. The present paper presents the equipment being built for the NPTC. (author)

  10. Development of automatic ultrasonic testing equipment for reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Kee Ok; Park, Dae Yung; Park, Moon Hoh; Koo, Kil Mo; Park, Kwang Heui; Kang, Sang Sin; Bang, Heui Song; Noh, Heui Choong; Kong, Woon Sik [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-08-01

    The selected weld areas of reactor pressure vessel and adjacent piping are examined by remote mechanized ultrasonic testing(MUT) equipment. Since the MUT equipment was purchased from Southwest Research Institute (SwRI) in April 1985, we have performed 15 inservice inspections and 5 preservice inspections. However, the reliability of examination was recently decreased rapidly as the problems which results from the old age of equipment and the frequent movement to plant site to site have occurred frequently. Therefore, the 3-axis control system hardware in occurring many problems among the equipments of mechanized ultrasonic testing (MUT) was designed and developed to cover the examination areas of nozzle-shell weld as specified in ASME Code Section XI and to improve the examination reliability. The new 3-axis control system hardware with the performance of this project was developed to be compatible with the old one and it was used as dual system or spare parts of the old system. Furthermore, the established technologies are expected to be applied to the similar control systems in nuclear power plant. 17 figs, 2 pix, 2 tabs, 10 refs. (Author).

  11. Development of automatic ultrasonic testing equipment for reactor pressure vessel

    International Nuclear Information System (INIS)

    Jang, Kee Ok; Park, Dae Yung; Park, Moon Hoh; Koo, Kil Mo; Park, Kwang Heui; Kang, Sang Sin; Bang, Heui Song; Noh, Heui Choong; Kong, Woon Sik

    1994-08-01

    The selected weld areas of reactor pressure vessel and adjacent piping are examined by remote mechanized ultrasonic testing(MUT) equipment. Since the MUT equipment was purchased from Southwest Research Institute (SwRI) in April 1985, we have performed 15 inservice inspections and 5 preservice inspections. However, the reliability of examination was recently decreased rapidly as the problems which results from the old age of equipment and the frequent movement to plant site to site have occurred frequently. Therefore, the 3-axis control system hardware in occurring many problems among the equipments of mechanized ultrasonic testing (MUT) was designed and developed to cover the examination areas of nozzle-shell weld as specified in ASME Code Section XI and to improve the examination reliability. The new 3-axis control system hardware with the performance of this project was developed to be compatible with the old one and it was used as dual system or spare parts of the old system. Furthermore, the established technologies are expected to be applied to the similar control systems in nuclear power plant. 17 figs, 2 pix, 2 tabs, 10 refs. (Author)

  12. Assessment of the performance of containment and surveillance equipment part 1: methodology

    International Nuclear Information System (INIS)

    Rezniczek, A.; Richter, B.

    2009-01-01

    Equipment performance aims at the creation of relevant data. As Containment and Surveillance (C/S) is playing an ever increasing role in safeguards systems, the issue of how to assess the performance of C/S equipment is being addressed by the ESARDA Working Group on C/S. The issue is important not only for the development of appropriate safeguards approaches but also for the review of existing approaches with regard to the implementation of the Additional Protocol (A P) and Integrated Safeguards. It is expected that the selection process of appropriate equipment, especially for unattended operation, is facilitated by the availability of methods to determine the performance of such equipment. Apart from EURATOM, the users of assessment methodologies would be the International Atomic Energy Agency (IAEA), plant operators, and instrument developers. The paper describes a non-quantitative performance assessment methodology. A structured procedure is outlined that allows assessing the suitability of different C/S instrumentation to comply with the objectives of its application. The principle to determine the performance of C/S equipment is to define, based on safeguards requirements, a task profile and to check the performance profile against the task profile. The performance profile of C/S equipment can be derived from the functional specifications and design basis tolerances provided by the equipment manufacturers.

  13. Failure diagnosis aiding device for plant equipment

    International Nuclear Information System (INIS)

    Uhara, Yoshihiko.

    1990-01-01

    The present invention intends to improve the efficiency of trouble shooting for equipments of industrial plants such as nuclear power plants. The device of the present invention comprises an intelligence base and an inference mechanism base. The intelligence base comprises a rule base, an information storing section having a part frame and a working frame and a user's frame. The parts frame contains the failure rate on every parts and data on related operations. The working frame contains the importance and frequency of working. The user's frame contains parameters showing the extent of user's skills. The rule base, the parts frame and the working frame can be selected in accordance with the extent of the user's skill in the inference mechanism. With such a constitution, failures can be checked with the intelligence base in accordance with the knowledges for the failures of the equipments and the extent of user's skill by way of the inference mechanism. (I.S.)

  14. Monitoring equipment environment during nuclear plant operation at Salem and Hope Creek generating stations

    International Nuclear Information System (INIS)

    Blum, A.; Smith, R.J.

    1991-01-01

    Monitoring of environmental parameters has become a significant issue for operating nuclear power plants. While the long-term benefits of plant life extension programs are being pursued with comprehensive environmental monitoring programs, the potential effect of local hot spots at various plant locations needs to be evaluated for its effect on equipment degradation and shortening of equipment qualified life. A significant benefit can be experienced from temperature monitoring when a margin exists between the design versus actual operating temperature. This margin can be translated into longer equipment qualified life and significant reduction in maintenance activities. At PSE and G, the immediate need for monitoring environmental parameters is being accomplished via the use of a Logic Beach Bitlogger. The Bitlogger is a portable data loggings system consisting of a system base, input modules and a communication software package. Thermocouples are installed on selected electrical equipment and cables are run from the thermocouples to the input module of the Bitlogger. Temperature readings are taken at selected intervals, stored in memory, and downloaded periodically to a PC software program, i.e., Lotus. The data is formatted into tabular or graphical documents. Because of their versatility, Bitloggers are being used differently at the authors Nuclear facility. At the Salem Station (2 Units-4 loop Westinghouse PWR), a battery powered, fully portable, calibrated Bitlogger is located in an accessible area inside Containment where it monitors the temperature of various electrical equipment within the Pressurizer Enclosure. It is planned that close monitoring of the local hot spot temperatures in this area will allow them to adjust and reconcile the environmental qualification of the equipment

  15. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  16. Automation and mechanization of in-service inspection of selected equipment in FRG's nuclear power plants

    International Nuclear Information System (INIS)

    Metke, E.

    1988-01-01

    The procedures and equipment are described for the automation and mechanization of in-service inspection in nuclear power plants in the FRG, used by the KWU company. Checks of the pressure vessel are done by visual means using a colour tv camera, the method of eddy currents and the ultrasonic method. An analysis is made of the time schedule of ultrasonic inspections, and the central column manipulator is described which allows to check all internal regions of the pressure vessel. Attention is also devoted to other devices, e.g., those for prestressing shanks, cleaning shanks, cleaning thread apertures, etc. A combined probe using the ultrasonic method and the eddy current method serves the inspection of heat exchange tubes in the steam generator. For inspecting the primary circuit the KWU company uses devices for checking and working the inner surface of pipes. Briefly described are examples of using KWU equipment in nuclear power plants in CMEA countries. (Z.M.). 11 figs., 6 refs

  17. 13. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 13. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    Selected papers from the 13th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE and FIDE.

  18. 13. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 13. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    Selected papers from the 13th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE and FIDE.

  19. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  20. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  1. 16. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 16. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    Selected papers from the 16th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, CONAE, and FIDE.

  2. 16. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 16. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Selected papers from the 16th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, CONAE, and FIDE.

  3. 14. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 14. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Selected papers from the 14th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, PEMEX, and FIDE.

  4. 18. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 18. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicos. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Selected papers from the 18th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, CONAE, and FIDE.

  5. 17. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 17. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Selected papers from the 17th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, CONAE, and FIDE.

  6. 18. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 18. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicos. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    Selected papers from the 18th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, CONAE, and FIDE.

  7. 14. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 14. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    Selected papers from the 14th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, PEMEX, and FIDE.

  8. 17. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 17. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Selected papers from the 17th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, CONAE, and FIDE.

  9. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  10. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  11. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  12. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  13. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  14. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  15. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  16. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  17. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  18. Setting the optimal type of equipment to be adopted and the optimal time to replace it

    OpenAIRE

    Albici, Mihaela

    2009-01-01

    The mathematical models of equipment’s wear and tear, and replacement theory aim at deciding on the purchase selection of a certain equipment type, the optimal exploitation time of the equipment, the time and ways to replace or repair it, or to ensure its spare parts, the equipment’s performance in the technical progress context, the opportunities to modernize it etc.

  19. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  20. 15. national seminar on the rational use of the energy and exposition of equipment and services. Transactions. [Selected Papers]; 15. seminario nacional sobre el uso racional de la energia y exposicion de equipos y servicios. Memoria tecnica

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Selected papers from the 15th annual national seminar on the rational use of the energy and exposition of equipment and services have been separately cited in the database. The seminar is jointly sponsored by ATPAE, Universidad autonoma Metropolitana, and FIDE.

  1. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  2. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  3. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  4. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  5. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  6. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  7. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  8. Performance of on-site Medical waste disinfection equipment in hospitals of Tabriz, Iran

    Directory of Open Access Journals (Sweden)

    Hassan Taghipour

    2016-10-01

    Full Text Available Background: The number of studies available on the performance of on-site medical waste treatment facilities is rare, to date. The aim of this study was to evaluate the performance of onsite medical waste treatment equipment in hospitals of Tabriz, Iran. Methods: A various range of the on-site medical waste disinfection equipment (autoclave, chemical disinfection, hydroclave, and dry thermal treatment was considered to select 10 out of 22 hospitals in Tabriz to be included in the survey. The apparatus were monitored mechanically, chemically, and biologically for a six months period in all of the selected hospitals. Results: The results of the chemical monitoring (Bowie-Dick tests indicated that 38.9% of the inspected autoclaves had operational problems in pre-vacuum, air leaks, inadequate steam penetration into the waste, and/or vacuum pump. The biological indicators revealed that about 55.55% of the samples were positive. The most of applied devices were not suitable for treating anatomical, pharmaceutical, cytotoxic, and chemical waste. Conclusion: Although on-site medical waste treating facilities have been installed in all the hospitals, the most of infectious-hazardous medical waste generated in the hospitals were deposited into a municipal solid waste landfill, without enough disinfection. The responsible authorities should stringently inspect and evaluate the operation of on-site medical waste treating equipment. An advanced off-site central facility with multi-treatment and disinfection equipment and enough capacity is recommended as an alternative.

  9. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  10. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  11. Ergonomic positioning or equipment for treating carpal tunnel syndrome.

    Science.gov (United States)

    O'Connor, Denise; Page, Matthew J; Marshall, Shawn C; Massy-Westropp, Nicola

    2012-01-18

    Non-surgical treatment, including ergonomic positioning or equipment, are sometimes offered to people experiencing mild to moderate symptoms from carpal tunnel syndrome (CTS). The effectiveness and duration of benefit from ergonomic positioning or equipment interventions for treating CTS are unknown. To assess the effects of ergonomic positioning or equipment compared with no treatment, a placebo or another non-surgical intervention in people with CTS. We searched the Cochrane Neuromuscular Disease Group Specialized Register (14 June 2011), the Cochrane Central Register of Controlled Trials (CENTRAL) (2011, Issue 2, in The Cochrane Library), MEDLINE (1966 to June 2011), EMBASE (1980 to June 2011), CINAHL Plus (1937 to June 2011), and AMED (1985 to June 2011). We also reviewed the reference lists of randomised or quasi-randomised trials identified from the electronic search. Randomised or quasi-randomised controlled trials comparing ergonomic positioning or equipment with no treatment, placebo or another non-surgical intervention in people with CTS. Two review authors independently selected trials for inclusion, extracted data and assessed risk of bias of included studies. We calculated risk ratios (RR) and mean differences (MD) with 95% confidence intervals (CI) for the primary and secondary outcomes. We pooled results of clinically and statistically homogeneous trials, where possible, to provide estimates of the effect of ergonomic positioning or equipment. We included two trials (105 participants) comparing ergonomic versus placebo keyboards. Neither trial assessed the primary outcome (short-term overall improvement) or adverse effects of interventions. In one small trial (25 participants) an ergonomic keyboard significantly reduced pain after 12 weeks (MD -2.40; 95% CI -4.45 to -0.35) but not six weeks (MD -0.20; 95% CI -1.51 to 1.11). In this same study, there was no difference between ergonomic and standard keyboards in hand function at six or 12 weeks or palm

  12. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  13. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  14. Stability analysis of multipoint tool equipped with metal cutting ceramics

    Science.gov (United States)

    Maksarov, V. V.; Khalimonenko, A. D.; Matrenichev, K. G.

    2017-10-01

    The article highlights the issues of determining the stability of the cutting process by a multipoint cutting tool equipped with cutting ceramics. There were some recommendations offered on the choice of parameters of replaceable cutting ceramic plates for milling based of the conducted researches. Ceramic plates for milling are proposed to be selected on the basis of value of their electrical volume resistivity.

  15. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  16. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  17. Concept of diagnostic monitoring of condition of selected equipment for V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Jaros, I.

    1981-01-01

    The vibroacoustic method based on picking up and processing vibrations, shocks and structural noise from the outer surface of equipment was chosen for testing the mechanical conditions of the reactor and of the main circulating pumps. The location of vibration pickups on the primary circuit components, their specifications, signal processing and evaluation are described. (M.D.)

  18. New approach to equipment quality evaluation method with distinct functions

    Directory of Open Access Journals (Sweden)

    Milisavljević Vladimir M.

    2016-01-01

    Full Text Available The paper presents new approach for improving method for quality evaluation and selection of equipment (devices and machinery by applying distinct functions. Quality evaluation and selection of devices and machinery is a multi-criteria problem which involves the consideration of numerous parameters of various origins. Original selection method with distinct functions is based on technical parameters with arbitrary evaluation of each parameter importance (weighting. Improvement of this method, presented in this paper, addresses the issue of weighting of parameters by using Delphi Method. Finally, two case studies are provided, which included quality evaluation of standard boilers for heating and evaluation of load-haul-dump (LHD machines, to demonstrate applicability of this approach. Analytical Hierarchical Process (AHP is used as a control method.

  19. Development of a telerobotic system for handling contaminated process equipment

    International Nuclear Information System (INIS)

    Fisher, J.J.; Ward, C.R.; Schuler, T.F.

    1987-01-01

    E. I. du Pont de Nemours and Company is evaluating a unique eight-degree-of-freedom Telerobot manipulator to perform size-reduction and material handling operations on contaminated process equipment at the Savannah River Plant (SRP). The Telerobot will be installed in the proposed Transuranic (TRU) Waste Processing Facility, which is scheduled to be operational by 1990. A full-scale prototype Telerobot, manufactured by GCA Corporation, St. Paul, MN is being tested with other process equipment in the Components Test Facility at the Savannah River Laboratory (SRL). All telerobotic operations required in the TRU Waste Facility such as crate unpacking, equipment dismantling, material size-reduction, and selected maintenance operations are being tested. This paper discusses the major mechanical and control features of the Telerobot system. Several system enhancements were added by SRL, including a new quick-hand-change coupling and expanded software control functions. The new software enables a system operator to perform both teleoperated and automatic tasks through several operating modes. These enhancements, as well as future mechanical, control system, and software features, are reviewed

  20. Current trends in small vocabulary speech recognition for equipment control

    Science.gov (United States)

    Doukas, Nikolaos; Bardis, Nikolaos G.

    2017-09-01

    Speech recognition systems allow human - machine communication to acquire an intuitive nature that approaches the simplicity of inter - human communication. Small vocabulary speech recognition is a subset of the overall speech recognition problem, where only a small number of words need to be recognized. Speaker independent small vocabulary recognition can find significant applications in field equipment used by military personnel. Such equipment may typically be controlled by a small number of commands that need to be given quickly and accurately, under conditions where delicate manual operations are difficult to achieve. This type of application could hence significantly benefit by the use of robust voice operated control components, as they would facilitate the interaction with their users and render it much more reliable in times of crisis. This paper presents current challenges involved in attaining efficient and robust small vocabulary speech recognition. These challenges concern feature selection, classification techniques, speaker diversity and noise effects. A state machine approach is presented that facilitates the voice guidance of different equipment in a variety of situations.

  1. Sensor equipment of the German earth scientific airplane program

    Science.gov (United States)

    Seige, P.

    1975-01-01

    The German airplane program for earth scientific research supports the work of a vast staff of earth scientists from universities and federal agencies. Due to their fields of interest, which are in oceanography, hydrology, geology, ecology, and forestry, five test areas were selected which are spread all over Germany. The sensor package, which was designed in accordance with the requirements of this group of scientists, will be installed in a DO 28 D2 type airplane. The sensor equipment consists of a series of 70-mm cameras having different film/filter combinations, a photogrammetric camera, an infrared radiometer, an 11-channel multispectral line scanner, a LANDSAT-compatible radiometer, and a complex avionic system. Along with the airplane, a truck will be equipped with a set of radiometers and other sensor devices for extensive ground-truth measurement; this also includes a cherry picker.

  2. Communication equipment radiation resistance ensurance

    International Nuclear Information System (INIS)

    Myrova, L.O.; Chelizhenko, A.Z.

    1983-01-01

    A review of works on radiation resistance of electronic equipment (epsilon epsilon) for 15 years is presented. The effect of ionizing radiation appearing as a result of nuclear explosions in nuclear facilities and in outerspace on epsilon epsilon has been considered. Types of radiation effects in epsilon epsilon, radiation effect on semiconductor devices and integrated circUits, types of epsilon epsilon failures, as well as the procass of radiation-resistant epsilon epsilon designing and selection of its main parameters have been described. The methods of epsilon epsilon flowsheet optimization, application of mathematical simulation and peculiarities of ensurance of epsilon epsilon radiation resistance of communication systems are considered. Peculiarities of designing of radiation-resistant quartz generators, secondary power supply sources and amplifiers are discussed

  3. 40 CFR 205.171-3 - Test motorcycle sample selection.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Test motorcycle sample selection. 205... ABATEMENT PROGRAMS TRANSPORTATION EQUIPMENT NOISE EMISSION CONTROLS Motorcycle Exhaust Systems § 205.171-3 Test motorcycle sample selection. A test motorcycle to be used for selective enforcement audit testing...

  4. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  5. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  6. Determining the Residual Lifetime of Qualified Electrical and I and C Equipment in Units 5 and 6 of Kozloduy NPP

    International Nuclear Information System (INIS)

    Radoslavov, Biser

    2012-01-01

    The proposed paper clarifies the environmental qualification and residual lifetime of installed equipment and electrical cables in operating WWER 1000 type units 5 and 6 of Kozloduy NPP. The qualification approach is a combination of analyses and tests in consideration of some specific features of WWER equipment. As a result of the study, selected equipment is divided in 26 groups. Qualification groups include similar types of equipment with equal resistance to foreign impacts, analogous critical parts, and same methods of control and estimation of residual lifetime. Qualification protocols were made for each group. (author)

  7. Possible radiation dose reduction by using digital X-ray equipment

    International Nuclear Information System (INIS)

    Horvathova, M.; Nikodemova, D.; Prikazska, M.

    2001-01-01

    The radiation load of population all over the world from medical examinations clearly demonstrates the importance of the introduction of the quality assurance and quality control programmes into the activities of radiology departments. The basic aim of quality assurance program is to ensure that the radiation dose is kept as low as reasonably practicable while still providing an adequate image quality. As many other fields, the rapid development of techniques brought change-over from the conventional analogue technique to the digital technique. In this process, the conventional X-ray film is being abandoned and images are being viewed on either laser film or monitor. The main advantages of using digital equipment lay in improved image quality and diagnostic accuracy through digital image processing, reduction in patients exposure, cost reduction by reduction of the film usage, more efficient storage and retrieval of radiographic images through picture archiving. Several studies that have been conducted for comparison of various diagnostic examinations show , that there is potential for dose saving in the digital image intensifier technique. The aim of this study was to compare measured values of dose-area product for colon investigations using different X-ray equipment types, two digital and two analogue. Our material consisted of 169 randomly selected patients, 115 of them were examined with digital equipment and 54 patients with the analogue equipment. The obtained results have confirmed the dose reduction and increase of diagnostic accuracy when using the digital equipment, with the added benefit of a good image quality. (authors)

  8. Establishment of Experimental Equipment for Training of Professionals in the Nuclear Radiation Measurement

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, S. K.; Seo, K. W.; Joo, Y. C.; Kim, I. C.; Woo, C. K.; Yoo, B. H. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2008-09-15

    The main purpose of this project is to establish experimental equipment for training of professionals and students in the field of radiation measurement, and settle the foundation for the advanced education system and program. The priority for the experimental equipment had been deduced by reviewing of the Nuclear Training and Education Center of KAERI and other country's training courses. Equipment for training of radiation professionals are High-Purity Germanium spectroscopic systems, alpha analyzers, and hand-held gamma/neutron inspector systems. For the basic experiments, electric personal dosimeters and a reader, radiation survey meters, and various alpha, beta and gamma radiation isotopes have been equipped. Some old or disused equipment and devices were disposed and re-arranged, and a new experiment lab had been settled for gamma spectroscopy. Along with the preparation of equipment, 14 experimental modules have been selected for practical and essential experiments training to professionals from industries, universities and research organizations. Among the modules, 7 important experiment notes had been prepared in Korea and also in English. As a consequence, these advanced radiation experimental setting would be a basis to cooperate with IAEA or other countries for international training courses. These activities would be a foundation for our contribution to the international nuclear society and for improving our nuclear competitiveness. The experimental equipment and application notes developed in this study will be used also by other training institutes and educational organizations through introducing and encouraging to use them to the nuclear society.

  9. Establishment of Experimental Equipment for Training of Professionals in the Nuclear Radiation Measurement

    International Nuclear Information System (INIS)

    Ahn, S. K.; Seo, K. W.; Joo, Y. C.; Kim, I. C.; Woo, C. K.; Yoo, B. H.

    2008-09-01

    The main purpose of this project is to establish experimental equipment for training of professionals and students in the field of radiation measurement, and settle the foundation for the advanced education system and program. The priority for the experimental equipment had been deduced by reviewing of the Nuclear Training and Education Center of KAERI and other country's training courses. Equipment for training of radiation professionals are High-Purity Germanium spectroscopic systems, alpha analyzers, and hand-held gamma/neutron inspector systems. For the basic experiments, electric personal dosimeters and a reader, radiation survey meters, and various alpha, beta and gamma radiation isotopes have been equipped. Some old or disused equipment and devices were disposed and re-arranged, and a new experiment lab had been settled for gamma spectroscopy. Along with the preparation of equipment, 14 experimental modules have been selected for practical and essential experiments training to professionals from industries, universities and research organizations. Among the modules, 7 important experiment notes had been prepared in Korea and also in English. As a consequence, these advanced radiation experimental setting would be a basis to cooperate with IAEA or other countries for international training courses. These activities would be a foundation for our contribution to the international nuclear society and for improving our nuclear competitiveness. The experimental equipment and application notes developed in this study will be used also by other training institutes and educational organizations through introducing and encouraging to use them to the nuclear society

  10. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  11. Performativity and the Politics of Equipping for Calculation

    DEFF Research Database (Denmark)

    Henriksen, Lasse Folke

    2013-01-01

    This article argues that the concept of performativity deepens our understanding of contemporary, expertise-driven processes of global economic governance. Tracing the World Bank's role in constructing a global market for microfinance, the paper suggests that the World Bank was instrumental...... in translating selected parts of economic models into practice, thereby changing microfinance practices globally. Socio-technical networks centered on the World Bank were created to equip actors to become part of a global market, which incorporated not only donors but also commercial investors. The paper makes...

  12. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  13. Information booklet on personal protective equipment: eye and face protection

    International Nuclear Information System (INIS)

    1992-01-01

    In all work places where hazards of various kinds are present and the same cannot be totally controlled by engineering methods, suitable personal protective equipment (PPE) shall be used. There are several types of eye and face protection devices available in the market and it is important that employees use the proper type for the particular job. The main classes of eye and face protection devices required for the industrial operations are as follows: (a) eye protection devices which includes: (i) safety goggles (ii) safety spectacles (iii) safety clipons and eye and face protection devices which are (i) eye shield, (ii) face shield, (iii) wire mesh screen guard. Guide lines for selecting appropriate ear and face protection equipment for nuclear installations are given. (M.K.V.). 4 annexures, 1 appendix

  14. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  15. Assessment of the performance of containment and surveillance equipment part 2: trial application

    International Nuclear Information System (INIS)

    Rezniczek, A.; Richter, B.; Jussofie, A.

    2009-01-01

    The adopted methodological approach for assessing the performance of Containment and Surveillance (C/S) equipment resulted from an account of work performed for and in cooperation with the ESARDA Working Group on C/S. It was applied on a trial basis to a dry storage facility for spent nuclear fuel and consisted of the following steps: (1) Acquisition and analysis of design information and operational characteristics of the facility under consideration, (2) assumptions on diversion and misuse scenarios, (3) assumptions on safeguards approach and definition of safeguards requirements, (4) compilation and characterisation of candidate C/S equipment, (5) performance assessment of C/S equipment. The candidate equipment taken into account was routinely used by the IAEA: DCM14-type camera, Type E capand- wire seal, COBRA fibre optic seal, and VACOSS electronic seal. Four applications were considered: camera mounted in the reception area, seal on secondary lid of transport and storage cask, seal on protective lid, and seal on group of casks. For these applications, requirements were defined and requirement levels were attributed. The assignment of performance levels was carried out by using the technical specifications and design basis tolerances provided by the equipment manufacturers. The results were entered into four performance assessment tables. Although the assessment methodology was not yet fully developed, its trial application yielded promising results with regard to the selection of appropriate C/S equipment.

  16. Pediatric interventional radiography equipment: safety considerations

    International Nuclear Information System (INIS)

    Strauss, Keith J.

    2006-01-01

    This paper discusses pediatric image quality and radiation dose considerations in state-of-the-art fluoroscopic imaging equipment. Although most fluoroscopes are capable of automatically providing good image quality on infants, toddlers, and small children, excessive radiation dose levels can result from design deficiencies of the imaging device or inappropriate configuration of the equipment's capabilities when imaging small body parts. Important design features and setup choices at installation and during the clinical use of the imaging device can improve image quality and reduce radiation exposure levels in pediatric patients. Pediatric radiologists and cardiologists, with the help of medical physicists, need to understand the issues involved in creating good image quality at reasonable pediatric patient doses. The control of radiographic technique factors by the generator of the imaging device must provide a large dynamic range of mAs values per exposure pulse during both fluoroscopy and image recording as a function of patient girth, which is the thickness of the patient in the posterior-anterior projection at the umbilicus (less than 10 cm to greater than 30 cm). The range of pulse widths must be limited to less than 10 ms in children to properly freeze patient motion. Variable rate pulsed fluoroscopy can be leveraged to reduce radiation dose to the patient and improve image quality. Three focal spots with nominal sizes of 0.3 mm to 1 mm are necessary on the pediatric unit. A second, lateral imaging plane might be necessary because of the child's limited tolerance of contrast medium. Spectral and spatial beam shaping can improve image quality while reducing the radiation dose. Finally, the level of entrance exposure to the image receptor of the fluoroscope as a function of operator choices, of added filter thickness, of selected pulse rate, of the selected field-of-view and of the patient girth all must be addressed at installation. (orig.)

  17. Developing ''SMART'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; SpencerR, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of: (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased finding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the ''Smart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations''. This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABB CENP), Sandia National Laboratories, Duke Engineering and Services (DE and S), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of smart equipment and predictive maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the Smart Equipment program will: (1) Identify and prioritize nuclear plant equipment that would most likely benefit from adding smart features; (2) Develop a methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i.e. smart equipment); (3) Develop a methodology to provide plant operators with real-time information through smart equipment Man-Machine Interfaces (MMI) to support their decision making; (4) Demonstrate the methodology on a targeted component and/or system; (5) Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed subtask

  18. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  19. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  20. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  1. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  2. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  3. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  4. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  5. Method and multichannel equipment for chemical analysis by X-ray emission

    International Nuclear Information System (INIS)

    Bacso, J.; Horkay, Gy.; Kalinka, G.; Kertesz, Zs.; Kiss Varga, M.; Lakatos, T.; Mathe, Gy.; Paal, A.; Sulik, B.

    1978-01-01

    In the patent a simple method and an apparatus are described for chemical analysis based on X-ray emission generated by irradiation. The concentrations of pre-selected elements can be determined easily by this method using an equipment containing microprocessor. The number of channels and the elements to be determined can be modified by a simple change in the program. (Sz.J.)

  6. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  7. Modified DHTT Equipment for Crystallization Studies of Mold Slags

    Science.gov (United States)

    Kölbl, Nathalie; Harmuth, Harald; Marschall, Irmtraud

    2018-04-01

    The double hot thermocouple technique (DHTT) enables simulations of the temperature gradient at near-service conditions during continuous casting of steel. With the equipment applied so far, a rectangular slag film of even thickness often cannot be achieved. Further, the minimum temperature frequently lies within the slag film. Modified equipment can avoid these disadvantages via the following design features. The entire furnace chamber is heated to the selected temperature of the cold wire, and the minimum temperature is not located within the slag film. Furthermore, the shape of the heating wire is improved, which enables mounting of a thin, rectangular slag film between four platinum wires. This modification allows for investigations on transparent and translucent slags. So far, the results from DHTT investigations were represented via snapshots of the samples at certain experimental times. Therefore, appropriate methods for the graphical representation of the results were suggested: the maximum crystallinity, the time related to certain crystallinities with a dependence on the position within the slag film, and the crystal growth rate. The CaO-MgO-Al2O3-SiO2 slag investigated with this equipment was mineralogically examined additionally, and based on thermodynamic calculations, the allocation of temperatures to certain positions within the crystallized slag film was possible.

  8. Considerations for evaluation and selection of solid waste handling apron conveyors

    Energy Technology Data Exchange (ETDEWEB)

    Lisiecki, H.G.

    1976-11-01

    Criteria to be used in evaluating and selecting conveyer equipment for facilities handling solid wastes, such as solid waste resource recovery facilities, are discussed. Types of conveyer pan design and chain mechanisms are described. It is concluded that the conveyer purchaser must be knowledgeable about the equipment available, the specific use of equipment, its performance specifications, and the overall maintenance and operating costs. (LCL)

  9. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  10. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  11. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  12. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  13. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  14. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  15. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  16. A Study of Seismic Capacity of Nuclear Equipment with Seismic Isolation System

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Min Kyu; Choun, Young Sun; Choi, In Kil; Seo, Jeong Moon

    2004-05-15

    In this study, the base isolation systems for equipment are presented and the responses of each isolation system are investigated. As for the base isolation systems, a natural rubber bearing (NRB), a high damping rubber bearing (HDRB) and a friction pendulum system (FPS) are selected. The shaking table tests are carried out for three kinds of structural types. As input motions, artificial time histories enveloping the US NRC RG 1.60 spectrum and the probability-based scenario earthquake spectra developed for the Korean nuclear power plant site as well as a typical near-fault earthquake record are used. Uniaxial, biaxial, and triaxial excitations are conducted with PGAs of 0.05, 0.1, 0.2 and 0.25g. Acceleration responses are measured at the top of the equipment model and the floors using an accelerometer. The reduction of the seismic forces transmitted to the equipment models are determined for different isolation systems and input motions.

  17. A Study of Seismic Capacity of Nuclear Equipment with Seismic Isolation System

    International Nuclear Information System (INIS)

    Kim, Min Kyu; Choun, Young Sun; Choi, In Kil; Seo, Jeong Moon

    2004-05-01

    In this study, the base isolation systems for equipment are presented and the responses of each isolation system are investigated. As for the base isolation systems, a natural rubber bearing (NRB), a high damping rubber bearing (HDRB) and a friction pendulum system (FPS) are selected. The shaking table tests are carried out for three kinds of structural types. As input motions, artificial time histories enveloping the US NRC RG 1.60 spectrum and the probability-based scenario earthquake spectra developed for the Korean nuclear power plant site as well as a typical near-fault earthquake record are used. Uniaxial, biaxial, and triaxial excitations are conducted with PGAs of 0.05, 0.1, 0.2 and 0.25g. Acceleration responses are measured at the top of the equipment model and the floors using an accelerometer. The reduction of the seismic forces transmitted to the equipment models are determined for different isolation systems and input motions

  18. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  19. Simulation to Assist in the Selection Process of New Airway Equipment in a Children's Hospital.

    Science.gov (United States)

    Roberts, Joan; Sawyer, Taylor; Foubare, Donald; Reid, Jennifer; Stone, Kimberly; Stephanian, Don; Thompson, Douglas

    2015-09-24

    To provide an informed choice of equipment purchase, we sought to use simulation to allow medical providers an opportunity to evaluate two potential laryngoscopes. The study followed a prospective, blinded comparison design. Participants were blinded to the laryngoscope brands by using alphabetic labels on the handles ("A" and "B"). Participants included a convenience sample of healthcare providers who perform intubation. Participants were allowed to perform intubation with the two laryngoscope brands on neonatal, child, and adolescent/adult airway simulators. After practicing with each of the two different laryngoscopes, participants completed an evaluation indicating their preference for one laryngoscope versus the other for each patient age group. Thirty-four healthcare providers participated in the study, including attendings, fellows, nurse practitioners, and transport team members from Neonatology, Pediatric Intensive Care, Anesthesiology, Emergency Medicine, Cardiac Intensive Care, and Otolaryngology. Participants overwhelmingly preferred brand 'A' (89%) over brand 'B' (11%). Providers overwhelmingly chose one laryngoscope over the other. Data from this evaluation were used to determine which of the two laryngoscope brands was purchased. Based on our experience, we feel other hospitals should consider the use of simulation to allow providers to examine, compare, and rate medical equipment prior to making purchasing decisions.

  20. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  1. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  2. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  3. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  4. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  5. Root cause analysis underscores the importance of understanding, addressing, and communicating cold chain equipment failures to improve equipment performance.

    Science.gov (United States)

    Lennon, Pat; Atuhaire, Brian; Yavari, Shahrzad; Sampath, Vidya; Mvundura, Mercy; Ramanathan, Nithya; Robertson, Joanie

    2017-04-19

    Vaccine cold chain equipment (CCE) in developing countries is often exposed to harsh environmental conditions, such as extreme temperatures and humidity, and is subject to many additional challenges, including intermittent power supply, insufficient maintenance capacity, and a scarcity of replacement parts. Together, these challenges lead to high failure rates for refrigerators, potentially damaging vaccines and adversely affecting immunization coverage. Providing a sustainable solution for improving CCE performance requires an understanding of the root causes of failure. Project teams conducted small-scale studies to determine the root causes of CCE failure in selected locations in Uganda and Mozambique. The evaluations covered 59 failed refrigerators and freezers in Uganda and 27 refrigerators in Mozambique. In Uganda, the vast majority of failures were due to a cooling unit fault in one widely used refrigerator model. In Mozambique, 11 of the 27 problems were attributable to solar refrigerators with batteries that were unable to hold a charge, and another eight problems were associated with a need to adjust thermostat settings. The studies showed that tracking and evaluation of equipment performance and failure can yield important, actionable information for a range of stakeholders, including local CCE technicians, the ministry of health, equipment manufacturers, and international partners such as the United Nations Children's Fund, World Health Organization, and Gavi, the Vaccine Alliance. Collaborative efforts to systematically collect and communicate data on CCE performance and causes of failure will help to improve the efficiency and reach of immunization programs in low- and middle-income countries. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  6. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  7. Musical Sound, Instruments, and Equipment

    Science.gov (United States)

    Photinos, Panos

    2017-12-01

    'Musical Sound, Instruments, and Equipment' offers a basic understanding of sound, musical instruments and music equipment, geared towards a general audience and non-science majors. The book begins with an introduction of the fundamental properties of sound waves, and the perception of the characteristics of sound. The relation between intensity and loudness, and the relation between frequency and pitch are discussed. The basics of propagation of sound waves, and the interaction of sound waves with objects and structures of various sizes are introduced. Standing waves, harmonics and resonance are explained in simple terms, using graphics that provide a visual understanding. The development is focused on musical instruments and acoustics. The construction of musical scales and the frequency relations are reviewed and applied in the description of musical instruments. The frequency spectrum of selected instruments is explored using freely available sound analysis software. Sound amplification and sound recording, including analog and digital approaches, are discussed in two separate chapters. The book concludes with a chapter on acoustics, the physical factors that affect the quality of the music experience, and practical ways to improve the acoustics at home or small recording studios. A brief technical section is provided at the end of each chapter, where the interested reader can find the relevant physics and sample calculations. These quantitative sections can be skipped without affecting the comprehension of the basic material. Questions are provided to test the reader's understanding of the material. Answers are given in the appendix.

  8. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  9. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  10. Reactor fuel charging equipment

    International Nuclear Information System (INIS)

    Wade, Elman.

    1977-01-01

    In many types of reactor fuel charging equipment, tongs or a grab, attached to a trolley, housed in a guide duct, can be used for withdrawing from the core a selected spent fuel assembly or to place a new fuel assembly in the core. In these facilities, the trolley may have wheels that roll on rails in the guide duct. This ensures the correct alignment of the grab, the trolley and fuel assembly when this fuel assembly is being moved. By raising or lowering such a fuel assembly, the trolley can be immerged in the coolant bath of the reactor, whereas at other times it can be at a certain level above the upper surface of the coolant bath. The main object of the invention is to create a fuel handling apparatus for a sodium cooled reactor with bearings lubricated by the sodium coolant and in which the contamination of these bearings is prevented [fr

  11. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  12. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  13. Development of automatic Ultrasonic testing equipment for reactor pressure vessel

    International Nuclear Information System (INIS)

    Kim, Kor R.; Kim, Jae H.; Lee, Jae C.

    1996-06-01

    The selected weld areas of a reactor pressure vessel and adjacent piping are examined by the remote mechanized ultrasonic testing (MUT) equipment. Since the MUT equipment was purchased from southwest Research Institute (SwRI) in April 1985, 15 inservice inspections and 5 preservice inspections are performed with this MUT equipment. However due to the old age of the equipment and frequent movements to plant sites, the reliability of examination was recently decreased rapidly and it is very difficult to keep spare parts. In order to resolve these problems and to meet the strong request from plant sites, we intend to develop a new 3-axis control system including hardware and software. With this control system, we expect more efficient and reliable examination of the nozzle to shell weld areas, which is specified in ASME Code Section XI. The new 3-axis control system hardware and software were designed and development of our own control system, the advanced technologies of computer control mechanism were established and examination reliability of the nozzle to shell weld area was improved. With the development of our 3-axis control system for PaR ISI-2 computer control system, the reliability of nozzle to shell weld area examination has been improved. The established technologies from the development and detailed analysis of existing control system, are expected to be applied to the similar control systems in nuclear power plants. (author). 12 refs., 4 tabs., 33 figs

  14. Development of automatic Ultrasonic testing equipment for reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kor R.; Kim, Jae H.; Lee, Jae C.

    1996-06-01

    The selected weld areas of a reactor pressure vessel and adjacent piping are examined by the remote mechanized ultrasonic testing (MUT) equipment. Since the MUT equipment was purchased from southwest Research Institute (SwRI) in April 1985, 15 inservice inspections and 5 preservice inspections are performed with this MUT equipment. However due to the old age of the equipment and frequent movements to plant sites, the reliability of examination was recently decreased rapidly and it is very difficult to keep spare parts. In order to resolve these problems and to meet the strong request from plant sites, we intend to develop a new 3-axis control system including hardware and software. With this control system, we expect more efficient and reliable examination of the nozzle to shell weld areas, which is specified in ASME Code Section XI. The new 3-axis control system hardware and software were designed and development of our own control system, the advanced technologies of computer control mechanism were established and examination reliability of the nozzle to shell weld area was improved. With the development of our 3-axis control system for PaR ISI-2 computer control system, the reliability of nozzle to shell weld area examination has been improved. The established technologies from the development and detailed analysis of existing control system, are expected to be applied to the similar control systems in nuclear power plants. (author). 12 refs., 4 tabs., 33 figs.

  15. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  16. Standard guide for the selection, training and qualification of nondestructive assay (NDA) personnel

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2004-01-01

    1.1 This guide contains good practices for the selection, training, qualification, and professional development of personnel performing analysis, calibration, physical measurements, or data review using nondestructive assay equipment, methods, results, or techniques. The guide also covers NDA personnel involved with NDA equipment setup, selection, diagnosis, troubleshooting, or repair. Selection, training, and qualification programs based on this guide are intended to provide assurance that NDA personnel are qualified to perform their jobs competently. This guide presents a series of options but does not recommend a specific course of action.

  17. A study on the test of efficiency of the diagnostic X-ray equipment according to their rectifications

    International Nuclear Information System (INIS)

    Seon, Jong Ryul

    1997-01-01

    For the efficient management of the diagnostic x-ray equipment, a nation-wide inspection of hospitals was performed by an inspection institute in Taejon in the first half of 1997. Among those hospitals inspected, 28 equipments(machines) which were over 500 mA were randomly selected according to their characteristics : 7 condenser type x-ray equipments, 7 three control phase of full wave rectification of type remote control x-ray equipments, 7 single phase of full wave rectification type for general radiography equipments, and 7 single phase of full wave rectification type of R/F equipments. We obtained the following results by conducting the experiment based on the efficiency of the equipments mentioned above. 1) When te equipments are analyzed, 2 out of 7 single phase of full wave rectification type of general radiography equipments(28.6%), 3 out of 7 single phase of full wave rectification type of R/F equipments(42.9%), 5 out of 7 three phase of full wave rectification type remote of control x-ray equipments(71.4%), and 4 out of 7 condenser type of x-ray equipments(57.1%) showed suitability. It proves the superiority of the three phase of full wave rectification type of remote control x-ray equipments. 2) From the overall analysis, only about 50% of the equipments(suitability of 14 out of 28) maintain the efficient management. Therefore, maintenance management of equipments is more necessary. If the efficiency of the x-ray equipment is uniformly maintained and managed to prevent the breakdown(trouble) beforehand especially through the continuous inspection of tube voltage, tube current, exposure time, and collimator, the financial loss and exposure dose to the patient, as well as the workers engaged in radiation, can be reduced for better medical service

  18. Methods for improvement of some parameters of medical X-ray diagnostic equipment. Basic faults in selection of appropriate new or used units

    International Nuclear Information System (INIS)

    Tonev, M.; Danev, N.; Constantinov, B.

    2004-01-01

    An analysis is made of the factors determining the quality and performance of the main types of medical equipment: conventional radiographic and fluoroscopic X-ray unit; X-ray computer tomograph (CT); angiographic, mammographic, densitometric and dental X-ray equipment; magnetic resonance MRI. The aim is to give certain directions for the method one should adopt on choosing and purchasing X-ray equipment. Also one should take into consideration the new Health law and the Regulation for radiation protection of persons undergoing medical examination or treatment. The problems can be solved with the close cooperation between radiologists, medical physicists and x-ray engineers

  19. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  20. Review and evaluation of technology, equipment, codes and standards for digitization of industrial radiographic film

    International Nuclear Information System (INIS)

    1992-05-01

    This reports contains a review and evaluation of the technology, equipment, and codes and standards related to the digitization of industrial radiographic film. The report presents recommendations and equipment-performance specifications that will allow the digitization of radiographic film from nuclear power plant components in order to produce faithful reproductions of flaw images of interest on the films. Justification for the specifications selected are provided. Performance demonstration tests for the digitization process are required and criteria for such tests is presented. Also several comments related to implementation of the technology are presented and discussed

  1. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  2. Developing ''smar'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; Spencer, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of : (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased funding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the S mart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations . This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABBCENP), Sandia National Laboratories, Duke Engineering and Services (DEandS), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of ''smart'' equipment and predicitve maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the ''smart'' quipment program will: 1. Identify the prioritize nulcear plant equipment that would most likely benefit from adding smart features, 2. Developa methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i. e. ''smart'' equipment), 3. Developa methodology to provide plant operators with real-time information through ''smart'' equipment Man-Machine Interfaces (MMI) to support their decision making, 4. Demonstrate the methodology on a targeted component and/or system, 5. Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed

  3. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  4. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  5. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  6. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  7. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  8. Development of the testing procedure for units and elements of mining equipment

    Directory of Open Access Journals (Sweden)

    P. B. Gerike

    2017-09-01

    Full Text Available The author considers in detail the stages of creating a testing procedure for mining equipment based on the complex implementation of principles of nondestructive testing and technical diagnostics. The author substantiates effectiveness of application of a complex diagnostic approach for assessing the state of metal structures and energy-mechanical equipment of mining machines. The opportunity for timely detection of defects, regardless of their type and degree of danger, presents itself only with a wide application of the modern methods of vibration diagnostics and nondestructive testing. The author substantiates the effectiveness of specific combination of methods of nondestructive testing, most optimally suited for solving given tasks. The article contains the developed complex of more than 120 diagnostic rules, suitable for performing automated analysis of vibroacoustic signal and revealing the main damages of energy-mechanical equipment based on selective groups of informative frequencies. The author formulates the main criteria that one can use as a basic platform for improving the methodology for normalizing the parameters of mechanical oscillations. The developed diagnostic criteria became a basis for the development of individual spectral masks suitable for performing the analysis of parameters of vibroacoustic waves generated during operation of mining equipment. The author proves necessity of transition of repair and maintenance divisions of industrial enterprises to the system of maintenance of machinery according to its actual technical state, and the developed complex of diagnostic rules for detecting defects can serve as a platform for the implementation of basic elements of this system. The author substantiates the principal validity of the developed methodology for testing mining machines equipment and its individual elements, such as the predictive modeling of degradation of technical state of mining equipment and the

  9. A MAINTENANCE STRATEGY MODEL FOR STATIC EQUIPMENT USING INSPECTION METHODOLOGIES AND RISK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    J.K. Visser

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Mechanical equipment used on process plants can be categorised into two main types, namely static and rotating equipment. A brief survey at a number of chemical process plants indicated that a number of maintenance strategies exist and are used for rotating equipment. However, some of these strategies are not directly applicable to static equipment, although the risk-based inspection (RBI methodology has been developed for pressure vessels. A generalised risk-based maintenance strategy for all types of static equipment does not currently exist. This paper describes the development of an optimised model of inspection methodologies, maintenance strategies, and risk management principles that are generically applicable for static equipment. It enables maintenance managers and engineers to select an applicable maintenance strategy and inspection methodology, based on the operational and business risks posed by the individual pieces of equipment.

    AFRIKAANSE OPSOMMING: Meganiese toerusting wat op prosesaanlegte gebruik word kan in twee kategorieë verdeel word, naamlik statiese en roterende toerusting. 'n Bondige ondersoek by 'n aantal chemiese prosesaanlegte het aangedui dat 'n aantal strategieë vir instandhouding van roterende toerusting gebruik word, terwyl die risikogebaseerde inspeksiemetodologie wel vir drukvate gebruik word. 'n Algemene risikogebaseerde instandhoudingstrategie vir alle tipes statiese toerusting is egter nie tans beskikbaar nie. Hierdie artikel beskryf die ontwikkeling van 'n geoptimeerde model van inspeksiemetodologieë, instandhoudingstrategieë, en risikobestuursbeginsels wat algemeen gebruik kan word vir statiese toerusting. Dit stel die instandhouding-bestuurders en -ingenieurs in staat om 'n instandhoudingstrategie en inspeksie-metodologie te kies, gebaseer op die operasionele en besigheidsrisiko's van die individuele toerusting.

  10. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  11. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  12. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  13. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  14. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  15. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  16. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  17. The history of anaesthetic equipment evaluation in the United Kingdom: lessons for developing future strategy.

    Science.gov (United States)

    Wilkes, A R; Pandit, J J; O'Sullivan, E

    2011-12-01

    Recent guidance published by the Association of Anaesthetists of Great Britain and Ireland encourages the purchase of equipment based on evidence of safety and performance. For many years, evidence of the safety and performance of anaesthetic equipment was published by various government departments and agencies. However, these schemes were gradually eroded over time such that many devices entered the market with little or no clinical evidence of their efficacy. This recently led to the Difficult Airway Society's issuing guidance to its members on how best to select new airway devices; guidance that was based on the available evidence. This article provides a short history of the evaluation of anaesthetic equipment in the United Kingdom. © 2011 The Authors. Anaesthesia © 2011 The Association of Anaesthetists of Great Britain and Ireland.

  18. The difficult business model for mask equipment makers and mask infrastructure development support from consortia and governments

    Science.gov (United States)

    Hector, Scott

    2005-11-01

    The extension of optical projection lithography through immersion to patterning features with half pitch face the challenge of being profitable in the small market for mask equipment while encountering significant R&D expenses to bring new generations of mask fabrication equipment to market. The total available market for patterned masks is estimated to be $2.5B to $2.9B per year. The patterned mask market is about 20% of the market size for lithography equipment and materials. The total available market for mask-making equipment is estimated to be about $800M per year. The largest R&D affordability issue arises for the makers of equipment for fabricating masks where total available sales are typically less than ten units per year. SEMATECH has used discounted cash flow models to predict the affordable R&D while maintaining industry accepted internal rates of return. The results have been compared to estimates of the total R&D cost to bring a new generation of mask equipment to market for various types of tools. The analysis revealed that affordability of the required R&D is a significant problem for many suppliers of mask-making equipment. Consortia such as SEMATECH and Selete have played an important role in cost sharing selected mask equipment and material development projects. Governments in the United States, in Europe and in Japan have also helped equipment suppliers with support for R&D. This paper summarizes the challenging business model for mask equipment suppliers and highlight government support for mask equipment and materials development.

  19. Quantifying Pollutant Emissions from Office Equipment Phase IReport

    Energy Technology Data Exchange (ETDEWEB)

    Maddalena, R.L.; Destaillats, H.; Hodgson, A.T.; McKone, T.E.; Perino, C.

    2006-12-01

    Although office equipment has been a focal point for governmental efforts to promote energy efficiency through programs such as Energy Star, little is known about the relationship between office equipment use and indoor air quality. This report provides results of the first phase (Phase I) of a study in which the primary objective is to measure emissions of organic pollutants and particulate matter from a selected set of office equipment typically used in residential and office environments. The specific aims of the overall research effort are: (1) use screening-level measurements to identify and quantify the concentrations of air pollutants of interest emitted by major categories of distributed office equipment in a controlled environment; (2) quantify the emissions of air pollutants from generally representative, individual machines within each of the major categories in a controlled chamber environment using well defined protocols; (3) characterize the effects of ageing and use on emissions for individual machines spanning several categories; (4) evaluate the importance of operational factors that can be manipulated to reduce pollutant emissions from office machines; and (5) explore the potential relationship between energy consumption and pollutant emissions for machines performing equivalent tasks. The study includes desktop computers (CPU units), computer monitors, and three categories of desktop printing devices. The printer categories are: (1) printers and multipurpose devices using color inkjet technology; (2) low- to medium output printers and multipurpose devices employing monochrome or color laser technology; and (3) high-output monochrome and color laser printers. The literature review and screening level experiments in Phase 1 were designed to identify substances of toxicological significance for more detailed study. In addition, these screening level measurements indicate the potential relative importance of different categories of office equipment

  20. Impacts of Water Quality on Residential Water Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Widder, Sarah H.; Baechler, Michael C.

    2013-11-01

    Water heating is a ubiquitous energy use in all residential housing, accounting for 17.7% of residential energy use (EIA 2012). Today, there are many efficient water heating options available for every fuel type, from electric and gas to more unconventional fuel types like propane, solar, and fuel oil. Which water heating option is the best choice for a given household will depend on a number of factors, including average daily hot water use (total gallons per day), hot water draw patterns (close together or spread out), the hot water distribution system (compact or distributed), installation constraints (such as space, electrical service, or venting accommodations) and fuel-type availability and cost. While in general more efficient water heaters are more expensive than conventional water heating technologies, the savings in energy use and, thus, utility bills can recoup the additional upfront investment and make an efficient water heater a good investment over time in most situations, although the specific payback period for a given installation will vary widely. However, the expected lifetime of a water heater in a given installation can dramatically influence the cost effectiveness and savings potential of a water heater and should be considered, along with water use characteristics, fuel availability and cost, and specific home characteristics when selecting the optimum water heating equipment for a particular installation. This report provides recommendations for selecting and maintaining water heating equipment based on local water quality characteristics.

  1. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    Science.gov (United States)

    Rossel, R. E.; Fedosseev, V. N.; Marsh, B. A.; Richter, D.; Rothe, S.; Wendt, K. D. A.

    2013-12-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  2. Oil leakage detection for electric power equipment based on ultraviolet fluorescence effect

    Science.gov (United States)

    Zhang, Jing; Wang, Jian-hui; Xu, Bin; Huang, Zhi-dong; Huang, Lan-tao

    2018-03-01

    This paper presents a method to detect the oil leakage of high voltage power equipment based on ultraviolet fluorescence effect. The method exploits the principle that the insulating oil has the fluorescent effect under the irradiation of specific ultraviolet light. The emission spectrum of insulating oil under excitation light with different wavelengths is measured and analyzed first. On this basis, a portable oil leakage detective device for high voltage power equipment is designed and developed with a selected 365 nm ultraviolet as the excitation light and the low light level camera as the fluorescence image collector. Then, the feasibility of the proposed method and device in different conditions is experimentally verified in the laboratory environment. Finally, the developed oil leakage detective device is applied to 500 kV Xiamen substation and Quanzhou substation. And the results show that the device can detect the oil leakage of high voltage electrical equipment quickly and conveniently even under the condition of a slight oil leakage especially in the low light environment.

  3. 46 CFR 108.404 - Selection of fire detection system.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Selection of fire detection system. 108.404 Section 108... DESIGN AND EQUIPMENT Fire Extinguishing Systems § 108.404 Selection of fire detection system. (a) If a... space. (b) The fire detection system must be designed to minimize false alarms. ...

  4. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  5. Compreensão e utilização da informação contábil pelos micro e pequenos empreendedores em seu processo de gestão

    Directory of Open Access Journals (Sweden)

    Sonia Raifur Kos

    2014-12-01

    Full Text Available Dados do SEBRAE (2014 destacam que as micro e pequenas empresas – MPEs respondem por cerca de 91% dos empregos e 27% do Produto Interno Bruto. No entanto, apesar da importância das MPEs, nota-se um interesse ainda pequeno no sentido de conhecer, analisar e propor alternativas para esse segmento empresarial. O presente estudo objetiva verificar se os gestores das MPEs recebem, compreendem e utilizam informações contábeis em seu processo de gestão. Três construtos foram investigados, (1 compreensão da informação; (2 utilização da informação e (3 recebimento da informação e relacionamento entre gestor e contador. A amostra foi constituída por 50 empresas da região centro-oeste do Estado do Paraná. A coleta de dados foi realizada pessoalmente, por meio de questionário com questões abertas e fechadas com escala Likert. Os resultados mostram que os gestores recebem parte das informações, não as compreendem, porém as usam como subsídio em seu processo decisório, dentro do limite de sua compreensão. Ainda se observou que o nível de formação do gestor interfere na compreensibilidade da informação. Com α < 0,01 foi demonstrado que o grau de instrução do gestor é determinante na compreensão da informação, já que existe diferença entre o escore médio de cada grupo.

  6. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  7. Multiple relay selection for delay-limited applications

    KAUST Repository

    Alsharoa, Ahmad M.; Abediseid, Walid; Alouini, Mohamed-Slim

    2013-01-01

    A multiple relay selection system model that implements the decode-and-forward mode is investigated. All communication nodes are assumed to be equipped by multiple antennas. Furthermore, lattices space-time coded multiple-input multiple-output half

  8. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  9. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  10. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  11. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment; El och kontrollutrustning i kaernkraftverk - Problematik vid utbyte av aaldrad utrustning

    Energy Technology Data Exchange (ETDEWEB)

    Nordling, Anna; Haakansson, Goeran

    2012-11-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  12. Optimum Tower Crane Selection and Supporting Design Management

    Directory of Open Access Journals (Sweden)

    Hyo Won Sohn

    2014-08-01

    Full Text Available To optimize tower crane selection and supporting design, lifting requirements (as well as stability should be examined, followed by a review of economic feasibility. However, construction engineers establish plans based on data provided by equipment suppliers since there are no tools with which to thoroughly examine a support design's suitability for various crane types, and such plans lack the necessary supporting data. In such cases it is impossible to optimize a tower crane selection to satisfy lifting requirements in terms of cost, and to perform lateral support and foundation design. Thus, this study is intended to develop an optimum tower crane selection and supporting design management method based on stability. All cases that are capable of generating an optimization of approximately 3,000 ˜ 15,000 times are calculated to identify the candidate cranes with minimized cost, which are examined. The optimization method developed in the study is expected to support engineers in determining the optimum lifting equipment management.

  13. Proposta de um modelo gerencial com ênfase na qualidade para micro e pequenas empresas de confecção

    Directory of Open Access Journals (Sweden)

    Leoni Pentiado Godoy

    2015-04-01

    Full Text Available A transição do século XX, para XXI, veio acompanhada de intensas e rápidas transformações sociais, econômicas e culturais. No ambiente organizacional, este cenário tem se tornado um desafio para as lideranças das organizações. A presente pesquisa tem como objetivo propor um Modelo Gerencial da Qualidade o qual possa auxiliar os administradores de micro e pequenas empresas (MPEs de confecção. A fim de assegurar a melhoria contínua do processo produtivo com base no perfil liderança. As MPEs objeto deste estudo foram em número de seis (6, localizadas no município de Toledo/Paraná. Os dados foram levantados através da aplicação de questionário. Pela análise dos dados evidencia-se o perfil dos gerentes, quanto à liderança. Foi sugerido um modelo para ajudar, às MPEs de confecções, a resolverem os seus problemas de forma adequada. Especialmente a partir da percepção dos colaboradores, proporcionando, uma constante melhoria dos processos e padrão de qualidade das confecções. Portanto, o modelo por meio de adaptações pertinentes um gerenciamento eficaz, com uma proposta de gestão com perspectiva de melhoria contínua, das MPEs de confecções. The transition from the twentieth century to the twenty-first, was accompanied by intense and rapid social, economic and cultural transformations. In the organizational setting, this scenario has become a challenge for the leadership of the organizations. The present paper aimed to propose a model of quality management that may assist administrators of micro and small companies company (SMEs clothing. To ensure continuous improvement of the production process based on the profile leadership. The SMEs object of this study were six in number (6, located in the city of Toledo/Paraná – Brazil. Data were collected through a questionnaire. Data analysis shows the profile of managers regarding leadership. Suggested a model to help, to SMEs clothing, to solve its problems

  14. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  15. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  16. DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS

    International Nuclear Information System (INIS)

    James E. Huebler

    2002-01-01

    Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage could be prevented if potentially hazardous construction equipment could be detected and identified before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with an optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachment. The work performed in the first quarter of the project includes development of the Research Management Plan, writing a paper assessing of the state-of-the-art in encroachment and third party damage detection, and development of factors for selecting the optical fiber sensors

  17. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    CERN Document Server

    Rossel, R E; Richter, D; Wendt, K D A; Rothe, S; Marsh, B A

    2013-01-01

    With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The syst...

  18. Grinding efficiency improvement of hydraulic cylinders parts for mining equipment

    Directory of Open Access Journals (Sweden)

    Korotkov Aleksandr

    2017-01-01

    Full Text Available The aim of the article is to find out ways to improve parts treatment and components of mining equipment on the example of hydraulic cylinders parts, used as pillars for mine roof supports, and other actuator mechanisms. In the course of the research work methods of machine retaining devices design were used, the scientific approaches for the selection of progressive grinding schemes were applied; theoretical and practical experience in the design and production of new constructions of grinding tools was used. As a result of this work it became possible to create a progressive construction of a machine retaining device for grinding of large parts of hydraulic cylinders, to apply an effective scheme of rotary abrasive treatment, to create and implement new design of grinding tools by means of grains with controllable shape and orientation. Implementation of the results obtained in practice will improve the quality and performance of repairing and manufacturing of mining equipment.

  19. PROBLEMS OF MANAGEMENT PROCESSES OF MODERNIZATION OF DOMESTIC FARM EQUIPMENT IN A VIEW OF AVAILABLE FINANCIAL SOURCES

    Directory of Open Access Journals (Sweden)

    Waldemar BOJAR

    2010-10-01

    Full Text Available In the paper analysis of technical equipment modernization process of selected farms in Kujawy Pomorze Province was made with questionnaire method. Not sufficient investment funds cause that farmers first of all buy worn equipment because of lower prices. They pay for cheaper machinery mostly with own funds while combines and tractors disburse partly from bank credits and/or loans and also the EU support. Introduction VAT from second hand machinery purchase after the accession markedly stops dynamism of equipment buying. In opinion o farmers advantage from second hand equipment getting are lower exploitation costs and also technological progress agreed with trends for simplification, specialization and concentration of farming. This is appeared in purchasing tractors of higher power and universal machinery of higher capacity and quality. Farmers decisions are rational because they consider both economical situation of their farms and increasing requirements of receivers of food raw materials.

  20. Technical Assessment Of Selection Of A Waste Disposal Site

    International Nuclear Information System (INIS)

    Lee, Bong Hun

    1992-04-01

    This book gives overall descriptions of technical assessment of selection of a waste disposal site, which deals with standard of selection on incinerator of city waste, the method over assessment of selection of incinerator in city waste, prerequisite of technical assessment for selection of incinerator, waste incinerator and related equipment such as form, structure, quality of material, ventilation device, plumbing system and electrical installation, and total plan like plan of construction and a measure taken against environmental pollution.

  1. 40 CFR 1054.626 - What special provisions apply to equipment imported under the Transition Program for Equipment...

    Science.gov (United States)

    2010-07-01

    ... EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT Special Compliance Provisions § 1054... provisions of this section and send us an annual report, as follows: (1) Notify the Designated Compliance... and manufacturing equipment. Companies that import equipment into the United States without meeting...

  2. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  3. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  4. Design and implementation of equipment for monitoring the salinity in the subsoil

    Directory of Open Access Journals (Sweden)

    Mariano Norzagaray Campos

    2012-09-01

    Full Text Available Geochemical exploration equipments to explore the contaminants and structures geological in the subsoil come from abroad are expensive and sometimes parts for replacement are not available in the market. So it is necessary design apparatus that meet cover these needs. To the monitoring of variations in salinity there is semi-automatic equipment, but it always has difficult to manage. However, is not equipment for the indirect study of salinity in the subsoil. In this work was design equipment for measurement the apparent resistivity in the subsoil, at same time allow know the salinity, as well as the detection of any pollutant in groundwater. For make it, was selected a design of earthing systems, with electronic hardware which were jointed for apply to subsoil a direct current (DC through an array dipole-dipole and vertical electric sounding, with brass and stainless steel electrodes. In the earthing systems the electrodes were collocated in the equidistant line between the detectors of potential and current. A geometric factor (K, that depend on theelectrodes distance and direct current (I injected in the electrodes A and B, was used for measure the potential difference between the electrodes M and N; after was calculate the resistivity point to point for obtain a subsoil tomography geoelectrical. The equipment was calibrated with minimum error (rms < 2% whit respect to curves obtained in similar commercial equipment. On this situation, in this work was modernized and automated an equipment to determine thesalinity of the subsoil. The instrument was tasted in the micro basin Texcoco, State of Mexico, to define the environment geometry formed by alluvial or lake sediments from igneous rocks (andesites, rhyolites and tuffs vitreous or “tepetates” which by its mineralogical composition allowed to the lateral resistivity be associate with free components trace from the aquifer: Cd, Cu, Cr, Co, Ni, Pb or Zn and others. This method constitutes

  5. Harmonics in power systems of ships with electrical propulsion drives. Effects on the equipment

    Energy Technology Data Exchange (ETDEWEB)

    Lehtonen, M [VTT Energy, Espoo (Finland). Energy Systems

    1996-11-01

    In this report the effect of harmonics on the power system equipment and loads, with special attention given to the circumstances in ships, is discussed. Some guidelines are given for the computation of additional harmonic losses in power cables and transformers. It is also shown, that if the system is rich in harmonics, these losses must be taken into account when sizing the equipment. The effect of harmonics on electrical machines is also discussed. The influence on induction machines is usually small. However, in large synchronous machines a significant degree of harmonic losses may be expected. Especially in the high voltage system the harmonics must be taken into account when selecting the machine ratings. Also the harmonic resonances, which may arise when using reactive power compensation capacitors, are discussed. Due to the risk of harmonic resonances, the use of capacitors is not recommended in marine power systems. Also the immunity of different load devices to harmonic distortion is discussed. The equipment considered are resistive loads, discharge lamps, universal machines and electronic equipment. Finally a brief survey is given on the standards and recommendations for the maximum distortion levels allowed. (author)

  6. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  7. 46 CFR 117.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft equipment. 117.175 Section 117.175... AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 117.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it...

  8. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  9. 40 CFR 1068.425 - What happens if one of my production-line engines/equipment exceeds the emission standards?

    Science.gov (United States)

    2010-07-01

    ... FOR ENGINE PROGRAMS Selective Enforcement Auditing § 1068.425 What happens if one of my production... engine/equipment to show it complies with all emission standards. (2) Include in your written report a...

  10. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  11. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  12. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  13. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  14. Development of Advanced Surface Enhancement Technology for Decreasing Wear and Corrosion of Equipment Used for Mineral Processing

    Energy Technology Data Exchange (ETDEWEB)

    Daniel Tao; Craig A. Blue

    2004-08-01

    Equipment wear is a major concern in the mineral processing industry, which dramatically increases the maintenance cost and adversely affects plant operation efficiency. In this research, wear problems of mineral processing equipment including screens, sieve bends, heavy media vessel, dewatering centrifuge, etc., were identified. A novel surface treatment technology, high density infrared (HDI) surface coating process was proposed for the surface enhancement of selected mineral processing equipment. Microstructural and mechanical properties of the coated samples were characterized. Laboratory-simulated wear tests were conducted to evaluate the tribological performance of the coated components. Test results indicate that the wear resistance of AISI 4140 and ASTM A36 steels can be increased 3 and 5 folds, respectively by the application of HDI coatings.

  15. The Evaluation of the Equipment and Quality of the Public Space of Poznań

    Directory of Open Access Journals (Sweden)

    Budner Waldemar W.

    2016-06-01

    Full Text Available The article defines the notion of public space and attempts to explain its forms and roles. The article realizes two cognitive goals: the evaluation of the equipment of public spaces in Poznań with the selected elements of landscape architecture and the quality of those spaces. Empirical research was conducted in the form of a survey addressed at 300 respondents. The research activities conducted in the course of work allow for the formulation of the following conclusions: the quality of life in a city depends on the condition of equipment of public space; the elements of landscape architecture make the public space of Poznań more attractive (contribute to its functionality, increase the aesthetics of urban space; the condition of the equipment of public space with landscape architecture is evaluated as good; the users of the public space in Poznań pointed out the problem of advertising pillars, advertisements and signboards, public toilets and the insufficient number of seats.

  16. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  17. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  18. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  19. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  20. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  1. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  2. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  3. Improved Biomass Cooking Stoves and Improved Stove Emission Equipment

    Energy Technology Data Exchange (ETDEWEB)

    HATFIELD, MICHAEL; Still, Dean

    2013-04-15

    -controlled stove and emissions equipment at levels scalable to meet global demand; and 3) global distribution through a variety of channels and partners. ARC has been instrumental in designing and improving more than 100 stove designs over the past thirty years. In the last four years, ASAT and ARC have played a key role in the production and sales of over 200,000 improved stoves in the developed and developing world. The ARC-designed emissions equipment is currently used by researchers in laboratories and field studies on five continents. During Phase I of the DOE STTR grant, ASAT and ARC worked together to apply their wealth of product development experience towards creating the next generation of improved cookstoves and emissions monitoring equipment. Highlights of Phase I for the biomass cookstove project include 1) the development of several new stove technologies that reached the DOE 50/90 benchmark; 2) fabrication of new stove prototypes by ASAT’s manufacturing partner, Shengzhou Stove Manufacturing (SSM); 3) field testing of prototype stoves with consumers in Puerto Rico and the US; and 4) the selection of three stove prototypes for further development and commercialization during Phase II. Highlights of Phase I for the emissions monitoring equipment project include: 1) creation of a new emissions monitoring equipment product, the Laboratory Emissions Monitoring System (LEMS 2) the addition of gravimetric PM measurements to the stove testing systems to meet International Standards Organization criteria; 3) the addition of a CO{sub 2} sensor and wireless 3G capability to the IAP Meter; and 4) and the improvement of sensors and signal quality on all systems. Twelve Regional Testing and Knowledge Centers purchased this equipment during the Phase I project period.

  4. Data acquisition, remote control and equipment monitoring for ISOLDE RILIS

    Energy Technology Data Exchange (ETDEWEB)

    Rossel, R.E., E-mail: ralf.erik.rossel@cern.ch [CERN, Geneva (Switzerland); Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany); Hochschule RheinMain, Fachbereich Design Informatik Medien, Wiesbaden (Germany); Fedosseev, V.N.; Marsh, B.A. [CERN, Geneva (Switzerland); Richter, D. [Hochschule RheinMain, Fachbereich Design Informatik Medien, Wiesbaden (Germany); Rothe, S. [CERN, Geneva (Switzerland); Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany); Wendt, K.D.A. [Institut für Physik, Johannes Gutenberg-Universität, Mainz (Germany)

    2013-12-15

    Highlights: • The requirements for continuous and automated RILIS operation are outlined. • Laser wavelength, power, beam position and pulse timing are continuously monitored. • A network-extended LabVIEW-based equipment operation framework was developed. • The system serves as a foundation for collaborative laser spectroscopy data acquisition. • Example applications have been successfully tested with ISOLDE experiment setups. -- Abstract: With a steadily increasing on-line operation time up to a record 3000 h in the year 2012, the Resonance Ionization Laser Ion Source (RILIS) is one of the key components of the ISOLDE on-line isotope user facility at CERN. Ion beam production using the RILIS is essential for many experiments due to the unmatched combination of ionization efficiency and selectivity. To meet the reliability requirements the RILIS is currently operated in shift duty for continuous maintenance of crucial laser parameters such as wavelength, power, beam position and timing, as well as ensuring swift intervention in case of an equipment malfunction. A recent overhaul of the RILIS included the installation of new pump lasers, commercial dye lasers and a complementary, fully solid-state titanium:sapphire laser system. The framework of the upgrade also required the setup of a network-extended, LabVIEW-based system for data acquisition, remote control and equipment monitoring, to support RILIS operators as well as ISOLDE users. The system contributes to four key aspects of RILIS operation: equipment monitoring, machine protection, automated self-reliance, and collaborative data acquisition. The overall concept, technologies used, implementation status and recent applications during the 2012 on-line operation period will be presented along with a summary of future developments.

  5. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  6. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  7. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  8. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  9. Process and equipment development for hot isostatic pressing treatability study

    Energy Technology Data Exchange (ETDEWEB)

    Bateman, Ken; Wahlquist, Dennis; Malewitz, Tim

    2015-03-01

    Battelle Energy Alliance (BEA), LLC, has developed processes and equipment for a pilot-scale hot isostatic pressing (HIP) treatability study to stabilize and volume reduce radioactive calcine stored at Idaho National Laboratory (INL). In 2009, the U. S. Department of Energy signed a Record of Decision with the state of Idaho selecting HIP technology as the method to treat 5,800 yd^3 (4,400 m^3) of granular zirconia and alumina calcine produced between 1953 and 1992 as a waste byproduct of spent nuclear fuel reprocessing. Since the 1990s, a variety of radioactive and hazardous waste forms have been remotely treated using HIP within INL hot cells. To execute the remote process at INL, waste is loaded into a stainless-steel or aluminum can, which is evacuated, sealed, and placed into a HIP furnace. The HIP simultaneously heats and pressurizes the waste, reducing its volume and increasing its durability. Two 1 gal cans of calcine waste currently stored in a shielded cask were identified as candidate materials for a treatability study involving the HIP process. Equipment and materials for cask-handling and calcine transfer into INL hot cells, as well as remotely operated equipment for waste can opening, particle sizing, material blending, and HIP can loading have been designed and successfully tested. These results demonstrate BEA’s readiness for treatment of INL calcine.

  10. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  11. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  12. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  13. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  14. Fitness of equipment used for medical exposures to ionising radiation

    International Nuclear Information System (INIS)

    1998-01-01

    The advice in this guidance note is aimed at employers in control of equipment used for medical exposures to ionising radiation and ancillary equipment. This includes NHS trusts, health authorities or boards, private hospitals, clinics, surgeries, medical X-ray facilities in industry, dentists and chiropractors. The guidance should also be useful to radiation protection advisers appointed by such employers. The guidance provides advice on the requirements of regulation 33 of the Ionising Radiations Regulations 1985 (IRR85). In particular, it covers: (a) the selection, installation, maintenance, calibration and replacement of equipment to ensure that it is capable of restricting, so far as reasonably practicable, the medical exposure of any person to the extent that this is compatible with the intended diagnostic or therapeutic purpose; (b) recommended procedures for the definitive calibration of radiotherapy treatment; and (c) the need to investigate incidents involving a malfunction or defect in any 'radiation equipment' which result in medical exposures much greater than intended and to notify the Health and Safety Executive (HSE). 'Medical exposure' is defined in IRR85 as exposure of a person to ionising radiation for the purpose of his or her medical or dental examination or treatment which is conducted under the direction of a suitably qualified person and includes any such examination or treatment conducted for the purposes of research. For convenience, people undergoing medical exposure will be referred to as 'patients' in this guidance. Nothing in this publication is intended to indicate whether or not patients should be informed of any incident resulting from malfunction or defect in equipment used for medical exposure and the possible consequences of that exposure. As stated above, this guidance concerns medical exposures much greater than intended and although exposures much lower than intended can also have serious consequences, the incident would not

  15. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  16. Nuclear EQ sourcebook: A compilation of documents for nuclear equipment qualification

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    In the nuclear power industry, environmental and seismic qualification of safety-related electrical and instrumentation equipment is collectively known as Equipment Qualification (EQ). Related technology, as well as regulatory requirements, have evolved rapidly during the last 15 years. For environmental qualification, what began in 1971 with one trial-use guide (IEEE Std 323-1971), now stands as a full complement of Nuclear Regulatory Commission (NRC) rules, guides and industry standards. In addition to the Institute of Electrical and Electronics Engineers (IEEE), the American Society of Mechanical Engineers (ASME) has also undertaken development of its own set of standards for use in qualifying safety-related mechanical equipment. To ensure that the original design and qualification is preserved, engineers need to select and use the correct set of NRC regulations, regulatory guides, industry standards, and generic correspondence. Given that the total number of these documents exceed 200, this task becomes resource intensive. This compilation is the first known publication available to serve the user-community need for a complete and exhaustive single source. Approximately 180 items (Bulletins, Federal Rules, Generic Letters, Notices, Regulatory Guides, IEEE Standards, IEEE Recommended Practices, and IEEE Guides) have been processed separately for inclusion on the data base

  17. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  18. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  19. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  20. 46 CFR 77.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding equipment. 77.40-1 Section 77.40-1... MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 77.40-1 Pilot boarding equipment. (a) This... vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on each side of the...

  1. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  2. Interim staff position on environmental qualification of safety-related electrical equipment: including staff responses to public comments. Regulatory report

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1981-07-01

    This document provides the NRC staff positions regarding selected areas of environmental qualification of safety-related electrical equipment, in the resolution of Unresolved Safety Issue A-24, 'Qualification of Class IE Safety-Related Equipment.' The positions herein are applicable to plants that are or will be in the construction permit (CP) or operating license (OL) review process and that are required to satisfy the requirements set forth in either the 1971 or the 1974 version of IEEE-323 standard

  3. Field application. Selective stimulation of reservoirs or perforated intervals with use of coiled tubing equipped with real-time data communication system in combination with straddle packer assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Oberascher, R.; Breimer, G. [GDF SUEZ E and P Deutschland GmbH, Lingen (Germany); Jonge, R.M. de [Baker Hughes (Netherlands)

    2013-08-01

    In two German gas wells a decline in production and wellhead pressures had been observed. Production logging data obtained by PLT surveys were evaluated, which showed that certain intervals within the reservoir section did not contribute, or showed a restricted contribution to the overall gas production. The restricted contribution was suspected to be caused by near-wellbore damage. To restore or enhance the production of the perforated intervals an acid treatment was considered in these wells in order to remove skin damage. To restore or enhance the production of the wells, an acid treatment of the perforated intervals was designed. For obtaining the required selective placement of the acid across the zones of interest, the use of coiled tubing (CT) in combination with a resettable straddle packer assembly was selected. The accuracy of the setting depth of the straddle packer was a critical issue for the execution of the well intervention operations. In order to obtain the required depth accuracy, the CT string was equipped with an intelligent CT communication system, which transfers real-time downhole data to surface. For the first time, a reservoir stimulation project was executed by combining CT equipped with a real-time data communication system (TeleCoil) and the Inflatable Straddle Acidizing Packer (ISAP) assembly. Inside the CT an encapsulated monoconductor cable was installed to transmit real-time data from the CT Bottom Hole Assembly (BHA) to surface. The BHA consists of a Casing Collar Locator (CCL) and downhole pressure and temperature gauges. Due to the protective jacket of the monoconductor cable, there are no restrictions in the use of different fluids in combination with the system. Information provided by the CCL monitoring tool ensures accurate depth correlations, whereas differential pressure measurements from the down-hole pressure gauges provide positive information about the setting and sealing conditions of the straddle packer assembly. The

  4. Highly selective coulometric method and equipment for the automated determination of plutonium

    International Nuclear Information System (INIS)

    Jackson, D.D.; Hollen, R.M.; Roensch, F.R.; Rein, J.E.

    1977-01-01

    A highly selective, controlled-potential coulometric method has been developed for the determination of plutonium. An automated instrument, consisting of commercial electronic components under control of a programmable calculator, is being constructed. Half-cell potentials and interfering anions are listed

  5. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  6. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  7. Weight/balance portable test equipment

    International Nuclear Information System (INIS)

    Whitlock, R.W.

    1994-01-01

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches

  8. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  9. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  10. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  11. Automatic dose-rate controlling equipment

    International Nuclear Information System (INIS)

    Szasz, T.; Nagy Czirok, Cs.; Batki, L.; Antal, S.

    1977-01-01

    The patent of a dose-rate controlling equipment that can be attached to X-ray image-amplifiers is presented. In the new equipment the current of the photocatode of the image-amplifier is led into the regulating unit, which controls the X-ray generator automatically. The advantages of the equipment are the following: it can be simply attached to any type of X-ray image-amplifier, it accomplishes fast and sensitive regulation, it makes possible the control of both the mA and the kV values, it is attached to the most reliable point of the image-transmission chain. (L.E.)

  12. Concepts of radiation processes selection for industrial realization. Chapter 6

    International Nuclear Information System (INIS)

    1997-01-01

    For selection of radiation processes in industry the processes usually are analyzing by technological and social effects, power-insensitivity, common efficiency. Technological effect is generally conditioned with uniqueness of radiation technologies which allow to obtain new material or certain one but with new properties. Social effect first of all concerns with influence of radiation technologies on consumer's psychology. Implementation of equipment for radiation technological process for both the new material production and natural materials radiation treatment is related with decision of three tasks: 1) Choice of radiation source; 2). Creation of special equipment for radiation and untraditional stages of the process; 3) Selection of radiation and other conditions ensuring of achievement of optimal technological and economical indexes

  13. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  14. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

    2004-05-27

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small

  15. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  16. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  17. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  18. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  19. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  20. 30 CFR 75.524 - Electric face equipment; electric equipment used in return air outby the last open crosscut...

    Science.gov (United States)

    2010-07-01

    ... used in return air outby the last open crosscut; maximum level of alternating or direct electric... other in return air outby the last open crosscut, shall not exceed one ampere as determined from the... Electrical Equipment-General § 75.524 Electric face equipment; electric equipment used in return air outby...

  1. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  2. 48 CFR 870.115 - Food service equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Food service equipment... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.115 Food service equipment. (a) All new food service equipment purchased for Dietetic Service through other than Defense General...

  3. Diagnostic x-ray equipment and its use

    International Nuclear Information System (INIS)

    1993-01-01

    The guide contains the requirements for the use, structure and operation of diagnostic x-ray equipment necessary to ensure the radiation safety of workers and patients. The guide is intended for the party responsible for operating the x-ray units, the staff operating, installing and maintaining x-ray examination equipment, and companies manufacturing and selling such equipment. Special requirements for mammographic and dental x-ray equipments are given in separate ST guides. (5 refs., 1 figs., 2 tabs.)

  4. Connected Equipment Maturity Model Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Butzbaugh, Joshua B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Whalen, Scott A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-01

    The Connected Equipment Maturity Model (CEMM) evaluates the high-level functionality and characteristics that enable equipment to provide the four categories of energy-related services through communication with other entities (e.g., equipment, third parties, utilities, and users). The CEMM will help the U.S. Department of Energy, industry, energy efficiency organizations, and research institutions benchmark the current state of connected equipment and identify capabilities that may be attained to reach a more advanced, future state.

  5. The Relevance of Vocational High School Curriculum with the Requirement of the Heavy Equipment Industries

    Science.gov (United States)

    Asfiyanur, E. P.; Sumardi, K.; Rahayu, Y.; Putra, R. C.

    2018-02-01

    This study aims to determine the relevance of competencies developed by vocational high schools with the needs of workers in the industrial world. This is to answer the statement from the world of industry that the competencies possessed by vocational secondary education graduates are not in accordance with industry standards. This research is a qualitative research conducted by collecting data, presenting accurate and objective information. Respondents of this research are industrial institutions in the field of heavy equipment, vocational education institutions and government agencies in charge of manpower. Selection of informants / sources of information used is purposive sample technique, which aims to give consideration to select informants who meet the criteria in providing accurate information. The results of this study provide insight and input to vocational secondary education managers about various information in developing vocational secondary education curriculum, major issues include curriculum content relevance, technological advances in the heavy equipment industry, updating of school facilities and collaboration between educational institutions and labor institutions and the industrial world in the development of vocational secondary education.

  6. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Dong Hee; KIm, Hyeong Gyun [Dept. of Radiological Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test.

  7. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    International Nuclear Information System (INIS)

    Hong, Dong Hee; KIm, Hyeong Gyun

    2016-01-01

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test

  8. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  9. Development of Base Transceiver Station Selection Algorithm for ...

    African Journals Online (AJOL)

    TEMS) equipment was carried out on the existing BTSs, and a linear algorithm optimization program based on the spectral link efficiency of each BTS was developed, the output of this site optimization gives the selected number of base station sites ...

  10. Future development of IR thermovision weather satellite equipment

    Science.gov (United States)

    Listratov, A. V.

    1974-01-01

    The self radiation of the surface being viewed is used for image synthesis in IR thermovision equipment. The installation of such equipment aboard weather satellites makes it possible to obtain cloud cover pictures of the earth's surface in a complete orbit, regardless of the illumination conditions, and also provides quantitative information on the underlying surface temperature and cloud top height. Such equipment is used successfully aboard the Soviet satellites of the Meteor system, and experimentally on the American satellites of the Nimbus series. With regard to surface resolution, the present-day IR weather satellite equipment is inferior to the television equipment. This is due primarily to the comparatively low detectivity of the IR detectors used. While IR equipment has several fundamental advantages in comparison with the conventional television equipment, the problem arises of determining the possibility for future development of weather satellite IR thermovision equipment. Criteria are examined for evaluating the quality of IR.

  11. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  12. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  13. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  14. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  15. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  16. 47 CFR 76.1621 - Equipment compatibility offer.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment compatibility offer. 76.1621 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1621 Equipment compatibility offer. Cable system... offer to supply each subscriber with special equipment that will enable the simultaneous reception of...

  17. 45 CFR 95.707 - Equipment management and disposition.

    Science.gov (United States)

    2010-10-01

    ... participation in the costs of replacement equipment shall be limited to the additional outlay. (4) If the... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment management and disposition. 95.707... PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.707 Equipment management and disposition...

  18. 14 CFR 25.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 25.1441... Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, the... oxygen available in each source of supply. (d) The oxygen flow rate and the oxygen equipment for...

  19. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  20. 49 CFR 238.230 - Safety appliances-new equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Safety appliances-new equipment. 238.230 Section... I Passenger Equipment § 238.230 Safety appliances—new equipment. (a) Applicability. This section..., 2007, that is equipped with a safety appliance, required by the “manner of application” provisions in...

  1. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  2. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  3. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  4. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  5. Selection, Training and Simulation

    Science.gov (United States)

    2000-03-01

    most Neck training, Altitudetehamber, PBG, Gas nixtures, Trampoline , important in flying. In years to come we will have a Statoergometer, Raling...superagile world, are mentioned neck, more if X-tra head worn equipment is used put below. a lot of stress to this system. In addition stress will 6-6 be...acceleration Pilot selection criteria like body-type, heart-cerebral forces, mainly head to foot (Gz). The heart itself is distance, vagal and sympathetic nerve

  6. Byen prisme

    DEFF Research Database (Denmark)

    Breitenbauch, Henrik Ø.; Winther, Mark; Jakobsen, Mikkel Broen

    Aleppo, Mosul, Kobane, Palmyra, Fallujah, Raqqa og Ramadi. Listen over byer, hvor der kæmpes eller er blevet kæmpet i Irak og Syrien, er lang. Kampen mod ISIL og den syriske borgerkrig er væsentlige eksempler på, at krigen og byerne i stigende grad er sammenhængende temaer. Verdens befolkningstal...

  7. Det Medicinske Politi

    DEFF Research Database (Denmark)

    Bonderup, Gerda

    Fattigdom og sygdom hang nøje sammen, opdagede man i oplysningstiden. Læger udarbejdede et koncept - Det Medicinske Politi: Sygdomme skulle ikke længere blot bekæmpes, men også forebygges. Den danske regering var stort set med på forslagene, og resultatet blev i første omgang ansættelse af embeds...

  8. Den globale kniv

    DEFF Research Database (Denmark)

    Dickson, Thomas

    2008-01-01

    De japanske Globalknive fra 1980'erne er knivskarpe hits. De vinder de fleste test i alle prisklasser og sælger fx fire gange mere på det engelske marked end øvrige knive i samme prisklasse. Der kæmpes en hård kamp mod kopieringen af originalerne. Thomas Dickson dissekerer her Globalknivene - hva...

  9. 40 CFR 63.1363 - Standards for equipment leaks.

    Science.gov (United States)

    2010-07-01

    ... the replacement equipment and the actual date of delivery of the replacement equipment. (E) The date... heavy liquid service. Information, data, and analysis used to determine that a piece of equipment or... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Standards for equipment leaks. 63.1363...

  10. 41 CFR 109-50.4801 - Equipment Gift Agreement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment Gift Agreement... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.48-Exhibits § 109-50.4801 Equipment Gift Agreement. (a) The following Equipment Gift Agreement format will be used to provide gifts of excess and/or surplus equipment...

  11. 36 CFR 1207.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1207.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... as follows: (1) Items of equipment with a current per-unit fair market value of less than $5,000 may...) Items of equipment with a current per unit fair market value in excess of $5,000 may be retained or sold...

  12. Management of radiological related equipments. Creating the equipment management database and analysis of the repair and maintenance records

    International Nuclear Information System (INIS)

    Eguchi, Megumu; Taguchi, Keiichi; Oota, Takashi; Kajiwara, Hiroki; Ono, Kiyotune; Hagio, Kiyofumi; Uesugi, Ekizo; Kajishima, Tetuo; Ueda, Kenji

    2002-01-01

    In 1997, we established the committee of equipments maintenance and management in our department. We designed the database in order to classify and register all the radiological related equipments using Microsoft Access. The management of conditions and cost of each equipment has become easier, by keeping and recording the database in the equipments management ledger and by filing the history of repairs or maintenances occurred to modalities. We then accounted numbers, cost of repairs and downtimes from the data of the repair and maintenance records for four years, and we reexamined the causal analysis of failures and the contents of the regular maintenance for CT and MRI equipments that had shown the higher numbers of repairs. Consequently, we have found the improvement of registration method of the data and the more economical way to use of the cost of repair. (author)

  13. 7 CFR 3015.168 - Disposal of equipment.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.168 Disposal of equipment. When original or replacement equipment is no longer to be used in projects or programs currently or... 7 Agriculture 15 2010-01-01 2010-01-01 false Disposal of equipment. 3015.168 Section 3015.168...

  14. 40 CFR 63.1434 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1434... Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63.1434 Equipment leak provisions. (a) The owner or operator of each affected source shall comply with the HON equipment leak...

  15. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  16. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  17. 46 CFR 96.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 96.40-1 Section 96.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 96.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  18. 46 CFR 195.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pilot boarding equipment. 195.40-1 Section 195.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 195.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  19. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  20. 14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne thunderstorm detection equipment... Aircraft and Equipment § 135.173 Airborne thunderstorm detection equipment requirements. (a) No person may... the aircraft is equipped with either approved thunderstorm detection equipment or approved airborne...

  1. Cleaning of the equipment of residual sodium by means of water-vacuum technology

    International Nuclear Information System (INIS)

    Klykov, B.P.; Lednev, A.I.

    1997-01-01

    Results of investigation into a problem of equipment decontamination from sodium, that have been conducted in OKBM since 1960 are given. The investigations performed have shown that a water-vacuum washing process is the most optimal method for equipment decontamination from sodium residues. The essence of the method is in conduction of sodium-water reaction under reduced pressure in a leak-tight tank. Boundary conditions are selected experimentally which not allow sodium to be melted during the process, that gives possibility to control the sodium-water reaction. Continuous removal of H 2 and reaction products creates safe conditions for the process conduction. More that 20-year period of operation of a stationary water-vacuum facility and washing the electromagnetic pump for BN-350 fast nuclear reactor directly at is test rig are the best proofs of the proposed method. This method is well suitable for washing the equipment contaminated by radioactive sodium, because by-products of the process are simply utilized. The method is used in a number of Russian enterprises, and recommended for implementation at BN-350 and BN-600 reactor plants. (author)

  2. 14 CFR 25.1439 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... also enable the flightcrew to use radio equipment. (4) The part of the equipment protecting the eyes... Regulations: (1) The equipment must be designed to protect the appropriate crewmember from smoke, carbon... must include— (i) Masks covering the eyes, nose and mouth, or (ii) Masks covering the nose and mouth...

  3. 40 CFR 63.769 - Equipment leak standards.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Equipment leak standards. 63.769... § 63.769 Equipment leak standards. (a) This section applies to equipment subject to this subpart and... release to detect leaks, except under the following conditions. (i) The owner or operator has obtained...

  4. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...

  5. Cost analysis for heavy equipment in earthfill work - An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

    Science.gov (United States)

    Arifin, Muhammad Faizal Ardhiansyah

    2017-03-01

    Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.

  6. 46 CFR 32.90-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Pilot boarding equipment. 32.90-1 Section 32.90-1... REQUIREMENTS Pilot Boarding Equipment § 32.90-1 Pilot boarding equipment. (a) This section applies to each... must have suitable pilot boarding equipment available for use on each side of the vessel. If a vessel...

  7. 29 CFR Appendix A to Subpart I of... - Non-Mandatory Guidelines for Hazard Assessment, Personal Protective Equipment (PPE) Selection...

    Science.gov (United States)

    2010-07-01

    ... conjunction with engineering controls, guards, and safe work practices and procedures. 2. Assessment and... practices, such as those associated with the installation of new equipment, and the lessons learned from..., including Airline Respirators when working in Confined Spaces —Barrier Creams (Signed and Dated) Example 5...

  8. Influence of different outdoor design conditions on design cooling load and design capacities of air conditioning equipments

    International Nuclear Information System (INIS)

    Aktacir, Mehmet Azmi; Bueyuekalaca, Orhan; Bulut, Huesamettin; Yilmaz, Tuncay

    2008-01-01

    Outdoor design conditions are important parameters for energy efficiency of buildings. The result of incorrect selection of outdoor design conditions can be dramatic in view of comfort and energy consumption. In this study, the influence of different outdoor design conditions on air conditioning systems is investigated. For this purpose, cooling loads and capacities of air conditioning equipments for a sample building located in Adana, Turkey are calculated using different outdoor design conditions recommended by ASHRAE, the current design data used in Turkey and the daily maximum dry and wet bulb temperatures of July 21st, which is generally accepted as the design day. The cooling coil capacities obtained from the different outdoor design conditions considered in this study are compared with each other. The cost analysis of air conditioning systems is also performed. It is seen that the selection of outdoor design conditions is a very critical step in calculation of the building cooling loads and design capacities of air conditioning equipments

  9. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  10. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  11. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  12. Optimum Remediation Conditions of Vertical Electrokinetic-Flushing Equipment to Decontaminate a Radioactive Soil

    International Nuclear Information System (INIS)

    Kim, Gye Nam; Yang, Byeong IL; Moon, Jei Kwon; Lee, Kune Woo

    2009-01-01

    Vertical electrokintic-flushing remediation equipment was developed for the remediation of a radioactive soil near nuclear facilities. An optimum reagent was selected to decontaminate the radioactive soil near nuclear facilities with the developed vertical electrokintic-flushing remediation equipment, and the optimum remediation conditions were established to obtain a higher remediation efficiency. Namely, acetic acid was selected as an optimum reagent due to its higher remediation efficiency. When the electrokinetic remediation and the electrokinetic-flushing remediation results were compared, the removal efficiency of 4.6% and the soil waste solution volume of 1.5 times were increased in the electrokinetic remediation. When the potential gradient within an electrokinetic soil cell was increased by two times (4.0 V/cm), the removal efficiencies of Co 2+ and Cs + were increased by about 4.3%( Co 2+ : 98.9%, Cs + : 96.7%). Also, when the reagent concentration was increased from 0.01 M to 0.05 M, the removal efficiency of Co 2+ was increased but that of Cs + was decreased. Therefore, the optimum remediation conditions were that the acetic concentration was 0.01 M ∼ 0.05 M, the potential gradient was 4 V/cm, the injection of reagent 2.4 ml/g, and the remediation period was 20 days.

  13. 29 CFR 1926.603 - Pile driving equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Pile driving equipment. 1926.603 Section 1926.603 Labor... Operations § 1926.603 Pile driving equipment. (a) General requirements. (1) Boilers and piping systems which are a part of, or used with, pile driving equipment shall meet the applicable requirements of the...

  14. 46 CFR 71.25-25 - Hull equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Hull equipment. 71.25-25 Section 71.25-25 Shipping COAST... Inspection § 71.25-25 Hull equipment. (a) At each annual inspection, the inspector shall conduct the following tests and inspections of hull equipment: (1) All subdivision bulkheads shall be examined to...

  15. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    International Nuclear Information System (INIS)

    1994-01-01

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs

  16. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs.

  17. 32 CFR 34.21 - Real property and equipment.

    Science.gov (United States)

    2010-07-01

    ... original equipment as trade-in or sell it and use the proceeds to offset the costs of the replacement... request approval to use equipment as trade-in or offset for replacement equipment (see paragraph (e)(1)(i... 32 National Defense 1 2010-07-01 2010-07-01 false Real property and equipment. 34.21 Section 34.21...

  18. Equipment performance monitoring in NPP Krsko (Summarized system health report)

    International Nuclear Information System (INIS)

    Djetelic, N.; Cicvaric, D.

    2004-01-01

    Management common goal is safe, reliable, effective, acceptable to public and conservative/cautious operation of NPP Krsko. A set of programs, including Corrective Action Program, Performance Indicators, Operating Experience, Self Assessment and System Health Report, is developed to assist NPP Krsko management in fulfilling those goals. System Health Report is a tool that management can use to quickly assess how selected systems are performing, to determine where additional management attention is required and to determine if appropriate corrective actions have been established. Summarized System Health Report is developed for management's quick overview of systems status, important system malfunctions and problems as well as major changes from previous assessment period. Summarized Report contains nine sections: status difference including brief explanation, selected performance indicators, new equipment problems, functional failures, important problem analyses, action plan for systems with Potential Danger (RED) status, maintenance rule status overview and systems availability (planned and unplanned).(author)

  19. 33 CFR 142.24 - Use of equipment.

    Science.gov (United States)

    2010-07-01

    ... CONTINENTAL SHELF ACTIVITIES WORKPLACE SAFETY AND HEALTH Personal Protective Equipment § 142.24 Use of equipment. (a) Each holder of a lease or permit issued under the Act shall ensure that all personnel who are required by this subpart to use or wear personal protective equipment do so when within the lease area or...

  20. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  1. 27 CFR 6.43 - Sale of equipment.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Furnishing Things of Value § 6.43 Sale of equipment. A transaction in which equipment is sold to a retailer by an industry member, except as provided.... Further, the negotiation by an industry member of a special price to a retailer for equipment from an...

  2. 46 CFR 28.130 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Survival craft equipment. 28.130 Section 28.130 Shipping... INDUSTRY VESSELS Requirements for All Vessels § 28.130 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, effective for the purpose it is intended to serve, and...

  3. An Evaluation Method of Equipment Reliability Configuration Management

    Science.gov (United States)

    Wang, Wei; Feng, Weijia; Zhang, Wei; Li, Yuan

    2018-01-01

    At present, many equipment development companies have been aware of the great significance of reliability of the equipment development. But, due to the lack of effective management evaluation method, it is very difficult for the equipment development company to manage its own reliability work. Evaluation method of equipment reliability configuration management is to determine the reliability management capabilities of equipment development company. Reliability is not only designed, but also managed to achieve. This paper evaluates the reliability management capabilities by reliability configuration capability maturity model(RCM-CMM) evaluation method.

  4. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  5. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  6. Home Safe Home: Appliances, Tools, and Small Equipment. Proceed with Caution: Consumer Safety in the Home, III.

    Science.gov (United States)

    Saskatchewan Consumer and Commercial Affairs, Regina.

    Many accidents in the home are caused by faulty, defective or improperly designed tools, appliances, and equipment. Government, non-governmental organizations, and industries cooperate to develop and implement standards for the safe design and manufacture of consumer products. This booklet provides information to help consumers select products,…

  7. Justification for Selecting Level A vs. Level B Personal Protective Equipment to Remediate a Room Containing Concentrated Acids, Bases and Radiological Constituents

    International Nuclear Information System (INIS)

    Hylko, J. M.; Thompson, A. L.; Walter, J. F.; Deecke, T. A.

    2002-01-01

    Selecting the appropriate personal protective equipment (PPE) is based on providing an adequate level of employee protection relative to the task-specific conditions and hazards. PPE is categorized into four ensembles, based on the degree of protection afforded; e.g., Levels A (most restrictive), B, C, and D (least restrictive). What is often overlooked in preparing an ensemble is that the PPE itself can create significant worker hazards; i.e., the greater the level of PPE, the greater the associated risks. Furthermore, there is confusion as to whether a more ''conservative approach'' should always be taken since Level B provides the same level of respiratory protection as Level A but less skin protection. This paper summarizes the Occupational Safety and Health Administration regulations addressing Level A versus Level B, and provides justification for selecting Level B over Level A without under-protecting the employee during a particular remediation scenario. The scenario consisted of an entry team performing (1) an initial entry into a room containing concentrated acids (e.g., hydrofluoric acid), bases, and radiological constituents; (2) sampling and characterizing container contents; and (3) retrieving characterized containers. The invasive nature of the hydrofluoric acid sampling and characterization scenario created a high potential for splash, immersion, and exposure to hazardous vapors, requiring additional skin protection. The hazards associated with this scenario and the chemical nature of hydrofluoric acid provided qualitative evidence to justify Level A. Once the hydrofluoric acid was removed from the room, PPE performance was evaluated against the remaining chemical inventory. If chemical breakthrough from direct contact was not expected to occur and instrument readings confirmed the absence of any hazardous vapors, additional skin protection afforded by wearing a vapor-tight, totally-encapsulated suit was not required. Therefore, PPE performance and

  8. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  9. Strategy for conformity of non-standard cryogenic equipment

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    CERN as an intergovernmental organization establishes its own Safety Rules as necessary for its proper functioning. In particular, the CERN General Safety Instruction for cryogenic equipment requires that cryogenic pressure equipment at CERN shall comply with the European Pressure Equipment Directive (PED). However, due to the particular features of some of the cryogenic equipment required for the accelerators, as well as the existence of international collaborations with in-kind contributions from non-EU countries, full compliance with the PED may not always be achieved. This situation is foreseen in the Safety Rules, where CERN HSE will define the Safety requirements applicable to such equipment as well as any eventual additional compensatory measure as to ensure a commensurate level of Safety for our pressure equipment. Where compliance with PED may not be achieved, CERN HSE will become the de facto Notified Body and therefore be in charge of the assessment of the conformity of the equipment to the applica...

  10. Selecting device for processing method of radioactive gaseous wastes

    International Nuclear Information System (INIS)

    Sasaki, Ryoichi; Komoda, Norihisa.

    1976-01-01

    Object: To extend the period of replacement of a filter for adsorbing radioactive material by discharging waste gas containing radioactive material produced from an atomic power equipment after treating it by a method selected on the basis of the results of measurement of wind direction. Structure: Exhaust gas containing radioactive material produced from atomic power equipment is discharged after it is treated by a method selected on the basis of the results of wind direction measurement. For Instance, in case of sea wind the waste gas passes through a route selected for this case and is discharged through the waste gas outlet. When the sea wind disappears (that is, when a land wind or calm sets in), the exhaust gas is switched to a route for the case other than that of the sea wind, so that it passes through a filter consisting of active carbon where the radioactive material is removed through adsorption. The waste gas now free from the radioactive material is discharged through the waste gas outlet. (Moriyama, K.)

  11. Methodology for assessing laser-based equipment

    Science.gov (United States)

    Pelegrina-Bonilla, Gabriel; Hermsdorf, Jörg; Thombansen, Ulrich; Abels, Peter; Kaierle, Stefan; Neumann, Jörg

    2017-10-01

    Methodologies for the assessment of technology's maturity are widely used in industry and research. Probably the best known are technology readiness levels (TRLs), initially pioneered by the National Aeronautics and Space Administration (NASA). At the beginning, only descriptively defined TRLs existed, but over time, automated assessment techniques in the form of questionnaires emerged in order to determine TRLs. Originally TRLs targeted equipment for space applications, but the demands on industrial relevant equipment are partly different in terms of, for example, overall costs, product quantities, or the presence of competitors. Therefore, we present a commonly valid assessment methodology with the aim of assessing laser-based equipment for industrial use, in general. The assessment is carried out with the help of a questionnaire, which allows for a user-friendly and easy accessible way to monitor the progress from the lab-proven state to the application-ready product throughout the complete development period. The assessment result is presented in a multidimensional metric in order to reveal the current specific strengths and weaknesses of the equipment development process, which can be used to direct the remaining development process of the equipment in the right direction.

  12. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  13. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  14. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  15. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  16. Contact Dermatitis to Personal Sporting Equipment in Youth.

    Science.gov (United States)

    Marzario, Barbara; Burrows, Dianne; Skotnicki, Sandy

    2016-07-01

    Contact dermatitis to personal sporting equipment in youth is poorly studied. To review the results of patch testing 6 youth to their sporting equipment in a dermatology general private practice from 2006 to 2011. A retrospective analysis of 6 youth aged 11 to 14 who were evaluated for chronic and persistent dermatitis occurring in relation to sports equipment was conducted. All patients were subjected to epicutaneous (patch) testing, which included some or all of the following: North American Contact Dermatitis Group (NACGD) series, textile series, rubber series, corticosteroid series, and raw material from the patients' own personal equipment. All cases had 1 or more positive patch test reactions to an allergen within the aforementioned series, and 3 subjects tested positive to their personal equipment in raw form. Allergic contact dermatitis, not irritant, was deemed the relevant cause of chronic dermatitis in 4 of the 6 patients due to positive reactions to epicutaneous tests and/or personal equipment. The utility of testing to patients' own sporting equipment was shown to be of additional value and should be considered when patch testing for contact allergy to sporting equipment. © The Author(s) 2015.

  17. Portfolio Purchasing Decision for Mobile Power Equipment of B2C E-Commerce Export Retailer Based on CVaR

    Science.gov (United States)

    Yanchun, Wan; Qiucen, Chen

    2017-11-01

    Purchasing is an important part of export e-commerce of B2C, which plays an important role on risk and cost control in supply management. From the perspective of risk control, the paper construct a CVaR model for portfolio purchase. We select a heavy sales mobile power equipment from a typical B2C e-commerce export retailer as study sample. This study optimizes the purchasing strategy of this type of mobile power equipment. The research has some reference for similar enterprises in purchasing portfolio decision.

  18. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  19. Multiple relay selection for delay-limited applications

    KAUST Repository

    Alsharoa, Ahmad M.

    2013-12-01

    A multiple relay selection system model that implements the decode-and-forward mode is investigated. All communication nodes are assumed to be equipped by multiple antennas. Furthermore, lattices space-time coded multiple-input multiple-output half duplex channel is applied. The main goal is to increase the throughput of the system by selecting multiple number of relays. The selection criteria depends on the maximum decoding delay at relays where the system implements a decoding time-out algorithm at each relay. This leads to a significant saving in the overall system power consumptions and attempts to solve the relays synchronization problem. All results are presented using numerical simulations. © 2012 IEEE.

  20. Medical equipment in government health facilities: missed opportunities.

    Science.gov (United States)

    Pardeshi, Geeta S

    2005-01-01

    The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. (1) To identify the problems in different stages of the life cycle. (2) To assess its financial implications and effect on service delivery. Analysis of secondary data from the latest Comptroller and Auditor General (CAG) Reports for the states in India. The study variables were category of equipment, financial implications and problems in the stages of life cycle. Calculation of proportions. A total of forty instances mentioning problems in the first phase of the life cycle of medical equipment were noted in 12 state reports. The equipment from the radiology department (15), equipment in the wards (5), laboratory (3) and operation theatres (4) were the ones most frequently implicated. In a majority of cases the financial implications amounted to twenty-five lakhs. The financial implications were in the form of extra expenditure, unfruitful expenditure or locking of funds. In 25 cases the equipment could not be put to use because of non-availability of trained staff and inadequate infrastructural support. Careful procurement, incoming inspection, successful installation and synchronization of qualified trained staff and infrastructural support will ensure timely onset of use of the equipment.

  1. Personal Protective Equipment

    National Research Council Canada - National Science Library

    1998-01-01

    ... of personal protective equipment A safety program for new employees is a necessary part of any orientation program An on-going safety program should be used to motivate employees to continue to use...

  2. Methodology development for availability improvement of standby equipment

    International Nuclear Information System (INIS)

    Shin, Sung Min; Jeon, In Seop; Kang, Hyun Gook

    2014-01-01

    The core damage frequency (CDF) of operating and constructing pressurized nuclear plants are ranging on the order of 10 -5 and 10 -6 per year. The target CDF of new NPP design has been set at 10 -7 . In this context, although various systems are currently studied, availability improvement of standby equipment will be more efficient than the additional application of safety systems. It is obvious in every aspect, such as management and cost efficiency. Here, soundness can affect equipment unavailability, and the soundness degrades because of aging. However, some studies did not consider aging when calculating the unavailability. Standby equipment can age because of two important factors: standby stress which accumulates over time, and test stress which accumulates with the number of tests (or operations). Both factors should be considered together when aging is considered. However, some studies only considered standby stress or test stress. There are some previous studies which considered both factors. Besides equipment soundness related to aging effect, some process like bypass during test also can affect equipment unavailability because the original function of equipment cannot be performed immediately during this process. However, there are seldom studies dealing with above factors as a whole problem. This study investigated a general approach to calculate the unavailability of standby equipment which considers aging caused by standby and test stresses and bypass process. Based on this general approach, we propose two maintenance strategies which aim to reduce standby equipment unavailability. In section 2, the general approach is presented. As one of the strategies, the changing test interval method (CIM) is introduced in section 3, and its effectiveness is also analyzed. The online monitoring method (OMM) is investigated in section 4 as another method to reduce equipment unavailability. In section 5, a combination of these two methods is analyzed. A general

  3. MGR COMPLIANCE PROGRAM GUIDANCE PACKAGE FOR RADIATION PROTECTION EQUIPMENT, INSTRUMENTATION, AND FACILITIES

    International Nuclear Information System (INIS)

    2000-01-01

    This Compliance Program Guidance Package identifies the regulatory guidance and industry codes and standards addressing radiation protection equipment, instrumentation, and support facilities considered to be appropriate for radiation protection at the Monitored Geologic Repository (MGR). Included are considerations relevant to radiation monitoring instruments, calibration, contamination control and decontamination, respiratory protection equipment, and general radiation protection facilities. The scope of this Guidance Package does not include design guidance relevant to criticality monitoring, area radiation monitoring, effluent monitoring, and airborne radioactivity monitoring systems since they are considered to be the topics of specific design and construction requirements (i.e., ''fixed'' or ''built-in'' systems). This Guidance Package does not address radiation protection design issues; it addresses the selection and calibration of radiation monitoring instrumentation to the extent that the guidance is relevant to the operational radiation protection program. Radon and radon progeny monitoring instrumentation is not included in the Guidance Package since such naturally occurring radioactive materials do not fall within the NRC's jurisdiction at the MGR

  4. Fire prevention and protection for trackless equipment

    Energy Technology Data Exchange (ETDEWEB)

    Burger, A.J.

    1988-10-01

    With the increased use of trackless diesel and electrical equipment underground, the fire danger associated with this equipment has increased. The need for adequate fire prevention and protection on all aspects of trackless mechanised mining must be taken into consideration. This paper describes briefly the causes of fires on trackless equipment and the precautions taken to reduce the risk of ignition. 1 tab.

  5. Load Bearing Equipment for Bone and Muscle

    Science.gov (United States)

    Shackelford, Linda; Griffith, Bryan

    2015-01-01

    Resistance exercise on ISS has proven effective in maintaining bone mineral density and muscle mass. Exploration missions require exercise with similar high loads using equipment with less mass and volume and greater safety and reliability than resistance exercise equipment used on ISS (iRED, ARED, FWED). Load Bearing Equipment (LBE) uses each exercising person to create and control the load to the partner.

  6. Analysis of the computational methods on the equipment shock response based on ANSYS environments

    International Nuclear Information System (INIS)

    Wang Yu; Li Zhaojun

    2005-01-01

    With the developments and completions of equipment shock vibration theory, math calculation method simulation technique and other aspects, equipment shock calculation methods are gradually developing form static development to dynamic and from linearity to non-linearity. Now, the equipment shock calculation methods applied worldwide in engineering practices mostly include equivalent static force method, Dynamic Design Analysis Method (abbreviated to DDAM) and real-time simulation method. The DDAM is a method based on the modal analysis theory, which inputs the shock design spectrum as shock load and gets hold of the shock response of the integrated system by applying separate cross-modal integrating method within the frequency domain. The real-time simulation method is to carry through the computational analysis of the equipment shock response within the time domain, use the time-history curves obtained from real-time measurement or spectrum transformation as the equipment shock load and find an iterative solution of a differential equation of the system movement by using the computational procedure within the time domain. Conclusions: Using the separate DDAM and Real-time Simulation Method, this paper carried through the shock analysis of a three-dimensional frame floating raft in ANSYS environments, analyzed the result, and drew the following conclusion: Because DDAM does not calculate damping, non-linear effect and phase difference between mode responses, the result is much bigger than that of real-time simulation method. The coupling response is much complex when the mode result of 3-dimension structure is being calculated, and the coupling response of non-shock direction is also much bigger than that of real-time simulation method when DDAM is applied. Both DDAM and real-time simulation method has its good points and scope of application. The designers should select the design method that is economic and in point according to the features and anti

  7. Equipment improvements for performance enhancement

    International Nuclear Information System (INIS)

    Gaestel, P.; Guesnon, H.; Sauze, G.

    1994-01-01

    In order to enhance the reactor availability, several improvements on reactor equipment have been developed: design optimization for stator maintenance replacement in the main alternator; adjustment modification of stator coils in the main alternator for an easier maintenance; improvement of the fuel handling line (pole crane, transfer equipment, loading machine); development of a loose part trapping system in the steam generator secondary circuit. 1 tab

  8. Low level photoneutron detection equipment

    International Nuclear Information System (INIS)

    Ji Changsong; Zhang Yuqin; Li Yuansui

    1991-01-01

    A low level photoneutron detection equipment has been developed. The photoneutrons produced by interaction of 226 Ra gamma quanta and deutron (D) target are detected with n-n discrimination detector made up of 3 He proportional counter array. The D-content information in the target can be obtained from the measured photoneutron counts. The equipment developed is mainly used for nondestructive D-content measurement of D-devices

  9. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  10. Antenna Selection for Full-Duplex MIMO Two-Way Communication Systems

    KAUST Repository

    Wilson-Nunn, Daniel; Chaaban, Anas; Sezgin, Aydin; Alouini, Mohamed-Slim

    2017-01-01

    Antenna selection for full-duplex communication between two nodes, each equipped with a predefined number of antennae and transmit/receive chains, is studied. Selection algorithms are proposed based on magnitude, orthogonality, and determinant criteria. The algorithms are compared to optimal selection obtained by exhaustive search as well as random selection, and are shown to yield performance fairly close to optimal at a much lower complexity. Performance comparison for a Rayleigh fading symmetric channel reveals that selecting a single transmit antenna is best at low signal-to-noise ratio (SNR), while selecting an equal number of transmit and receive antennae is best at high SNR.

  11. Antenna Selection for Full-Duplex MIMO Two-Way Communication Systems

    KAUST Repository

    Wilson-Nunn, Daniel

    2017-03-11

    Antenna selection for full-duplex communication between two nodes, each equipped with a predefined number of antennae and transmit/receive chains, is studied. Selection algorithms are proposed based on magnitude, orthogonality, and determinant criteria. The algorithms are compared to optimal selection obtained by exhaustive search as well as random selection, and are shown to yield performance fairly close to optimal at a much lower complexity. Performance comparison for a Rayleigh fading symmetric channel reveals that selecting a single transmit antenna is best at low signal-to-noise ratio (SNR), while selecting an equal number of transmit and receive antennae is best at high SNR.

  12. Earthquake protection of essential civil and industrial equipments

    International Nuclear Information System (INIS)

    Bourrier, P.; Le Breton, F.; Thevenot, A.

    1986-01-01

    This document presents the principal reflexions concerning seismic engineering applications for equipment and the difference of the non-employment towards these structures. The notion of essential equipment is then pointed out as well as the main particularities of equipment considered as structures. Finally, this document illustrates a few pathological examples encountered after an earthquake, and presents some equipments of a nuclear power plant which to resist an increased safety seism [fr

  13. Plutonium Immobilization Can Loading Equipment Review

    International Nuclear Information System (INIS)

    Kriikku, E.; Ward, C.; Stokes, M.; Randall, B.; Steed, J.; Jones, R.; Hamilton, L.

    1998-05-01

    This report lists the operations required to complete the Can Loading steps on the Pu Immobilization Plant Flow Sheets and evaluates the equipment options to complete each operation. This report recommends the most appropriate equipment to support Plutonium Immobilization Can Loading operations

  14. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  15. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  16. Integrating HIV care and treatment into primary healthcare: Are clinics equipped?

    Directory of Open Access Journals (Sweden)

    Talitha Crowley

    2014-01-01

    Full Text Available Background: The demand for HIV care and treatment services is increasing rapidly and strategies to sustain long-term care should be employed. The decentralisation and integration of HIV care and treatment services into primary healthcare (PHC is vitally important in order to ensure optimal access to life-saving antiretroviral therapy and ongoing chronic care. Conversely, the PHC system is fraught with the current burden of disease. Setting: The study was conducted in PHC clinics in the uMgungundlovu district, Kwa-Zulu Natal.Aim: The objectives of the study were to assess whether PHC clinics were equipped to deliver integrated HIV services and to evaluate the availability of resources as well as support systems for HIV care and treatment in PHC clinics.Methods: A quantitative, cross-sectional descriptive study was undertaken in 20 randomly-selected, eligible clinics in the uMgungundlovu district, KwaZulu-Natal, South Africa. An evaluation instrument was completed through observations and review of the clinic data records. Criteria were based on the World Health Organization’s guide to indicators for antiretroviral programmes as well as South African HIV standards for PHC facilities.Results: None of the clinics were equipped adequately. Clinics with a higher patient load had poorer scores, whilst clinics providing antiretroviral therapy were better equipped in terms of human resources and infrastructure.Conclusion: HIV services are an essential part of primary healthcare and clinics need to be equipped adequately in order to render this service. It is unlikely that the over-burdened health system would be able to cope with an increased number of patients on antiretroviral therapy in the long term, whilst maintaining quality of services, without support being given to PHC clinics.

  17. Integrating HIV care and treatment into primary healthcare: Are clinics equipped?

    Directory of Open Access Journals (Sweden)

    Talitha Crowley

    2014-08-01

    Full Text Available Background: The demand for HIV care and treatment services is increasing rapidly and strategies to sustain long-term care should be employed. The decentralisation and integration of HIV care and treatment services into primary healthcare (PHC is vitally important in order to ensure optimal access to life-saving antiretroviral therapy and ongoing chronic care. Conversely, the PHC system is fraught with the current burden of disease. Setting: The study was conducted in PHC clinics in the uMgungundlovu district, Kwa-Zulu Natal. Aim: The objectives of the study were to assess whether PHC clinics were equipped to deliver integrated HIV services and to evaluate the availability of resources as well as support systems for HIV care and treatment in PHC clinics. Methods: A quantitative, cross-sectional descriptive study was undertaken in 20 randomly-selected, eligible clinics in the uMgungundlovu district, KwaZulu-Natal, South Africa. An evaluation instrument was completed through observations and review of the clinic data records. Criteria were based on the World Health Organization’s guide to indicators for antiretroviral programmes as well as South African HIV standards for PHC facilities. Results: None of the clinics were equipped adequately. Clinics with a higher patient load had poorer scores, whilst clinics providing antiretroviral therapy were better equipped in terms of human resources and infrastructure. Conclusion: HIV services are an essential part of primary healthcare and clinics need to be equipped adequately in order to render this service. It is unlikely that the over-burdened health system would be able to cope with an increased number of patients on antiretroviral therapy in the long term, whilst maintaining quality of services, without support being given to PHC clinics.

  18. Use of complex electronic equipment within radiative areas of PWR power plants: feability study

    International Nuclear Information System (INIS)

    Fremont, P.; Carquet, M.

    1988-01-01

    EDF has undertaken a study in order to evaluate the technical and economical feasibility of using complex electronic equipment within radiative areas of PWR power plants. This study lies on tests of VLSI components (Random Access Memories) under gamma rays irradiations, which aims are to evaluate the radiation dose that they can withstand and to develop a selection method. 125 rad/h and 16 rad/h tests results are given [fr

  19. The importance of social networks in their association to drug equipment sharing among injection drug users: a review.

    Science.gov (United States)

    De, Prithwish; Cox, Joseph; Boivin, Jean-François; Platt, Robert W; Jolly, Ann M

    2007-11-01

    To examine the scientific evidence regarding the association between characteristics of social networks of injection drug users (IDUs) and the sharing of drug injection equipment. A search was performed on MEDLINE, EMBASE, BIOSIS, Current Contents, PsycINFO databases and other sources to identify published studies on social networks of IDUs. Papers were selected based on their examination of social network factors in relation to the sharing of syringes and drug preparation equipment (e.g. containers, filters, water). Additional relevant papers were found from the reference list of identified articles. Network correlates of drug equipment sharing are multi-factorial and include structural factors (network size, density, position, turnover), compositional factors (network member characteristics, role and quality of relationships with members) and behavioural factors (injecting norms, patterns of drug use, severity of drug addiction). Factors appear to be related differentially to equipment sharing. Social network characteristics are associated with drug injection risk behaviours and should be considered alongside personal risk behaviours in prevention programmes. Recommendations for future research into the social networks of IDUs are proposed.

  20. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  1. Medical equipment in government health facilities: Missed opportunities

    OpenAIRE

    Pardeshi Geeta

    2005-01-01

    BACKGROUND: The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. AIMS: (1) To identify the probl...

  2. Preconceptual systems and equipment for plugging of man-made accesses to a repository in basalt

    International Nuclear Information System (INIS)

    Taylor, C.L.; O'Rourke, J.E.; Allirot, D.; O'Connor, K.

    1980-09-01

    This report presents results of a study leading to preconceptual designs for plugging boreholes, shafts, and tunnels to a nuclear waste repository in basalt. Beginning design criteria include a list of preferred plug materials and plugging machines that were selected to suit the environmental conditions, and depths, diameters, and orientations of the accesses to a nuclear waste repository in the Columbia River basalts located in eastern Washington State. The environmental conditions are described. The fiscal year 1979-1980 Task II work is presented in two parts: preliminary testing of materials for plugging of man-made accesses to a repository in basalt (described in a separate report); and preconceptual systems and equipment for plugging of man-made accesses to a repository in basalt (described in this report). To fulfill the scope of the Task II work, Woodward-Clyde Consultants (WCC) was requested to: provide preconceptual systems for plugging boreholes, tunnels, and shafts in basalt; describe preconceptual borehole plugging equipment for placing the selected materials in man-made accesses; utilize the quality assurance program, program plan and schedule, and work plans previously developed for Task II; and prepare a preliminary report

  3. Localization of equipment for digital plant protection system

    Energy Technology Data Exchange (ETDEWEB)

    Koo, I. S.; Park, H. Y.; Lee, C. K. and others

    2000-10-01

    The objective of this project lies on the development of design requirements, establishment of structure and manufacture procedures, development of the software verification and validation(V and V) techniques of the digital plant protection system. The functional requirements based on the analog protection system and digital design requirements are introduced, the processor and system bus for safety grade equipment are selected and the interface requirements and the design specification have been developed in order to manufacture the quick prototype of the digital plant protection system. The selection guidelines of parts, software development and coding and testing for digital plant protection system have been performed through manufacturing the quick prototype based on the developed design specification. For the software verification and validation, the software review plan and techniques of verification and validation have been researched. The digital validation system is developed in order to verify the quick prototype. The digital design requirements are reviewed by the software safety plan and V and V plans. The formal methods for verifying the safety-grade software are researched, then the methodology of formal analysis and testing have been developed.

  4. Localization of equipment for digital plant protection system

    International Nuclear Information System (INIS)

    Koo, I. S.; Park, H. Y.; Lee, C. K. and others

    2000-10-01

    The objective of this project lies on the development of design requirements, establishment of structure and manufacture procedures, development of the software verification and validation(V and V) techniques of the digital plant protection system. The functional requirements based on the analog protection system and digital design requirements are introduced, the processor and system bus for safety grade equipment are selected and the interface requirements and the design specification have been developed in order to manufacture the quick prototype of the digital plant protection system. The selection guidelines of parts, software development and coding and testing for digital plant protection system have been performed through manufacturing the quick prototype based on the developed design specification. For the software verification and validation, the software review plan and techniques of verification and validation have been researched. The digital validation system is developed in order to verify the quick prototype. The digital design requirements are reviewed by the software safety plan and V and V plans. The formal methods for verifying the safety-grade software are researched, then the methodology of formal analysis and testing have been developed

  5. CV equipment responsibilities

    CERN Document Server

    Pirollet, B

    2008-01-01

    This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. The various interfaces, providers and users of the water supply systems and clean water raising systems are described.

  6. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  7. Radio monitoring problems, methods, and equipment

    CERN Document Server

    Rembovsky, Anatoly; Kozmin, Vladimir; Smolskiy, Sergey

    2009-01-01

    Offers a unified approach to fundamental aspects of Automated Radio Monitoring (ARM). This book discusses the development, modeling, design, and manufacture of ARM systems. It provides classification and descriptions of modern high-efficient hardware-software ARM equipment, including the equipment for detection and radio direction-finding.

  8. [Application of information management system about medical equipment].

    Science.gov (United States)

    Hang, Jianjin; Zhang, Chaoqun; Wu, Xiang-Yang

    2011-05-01

    Based on the practice of workflow, information management system about medical equipment was developed and its functions such as gathering, browsing, inquiring and counting were introduced. With dynamic and complete case management of medical equipment, the system improved the management of medical equipment.

  9. Days individual equipment of protection and professional risks

    International Nuclear Information System (INIS)

    2007-01-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  10. 24 CFR 965.306 - Energy conservation equipment and practices.

    Science.gov (United States)

    2010-04-01

    ... Measures § 965.306 Energy conservation equipment and practices. In purchasing original or, when needed, replacement equipment, PHAs shall acquire only equipment that meets or exceeds the minimum efficiency... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Energy conservation equipment and...

  11. 30 CFR 77.410 - Mobile equipment; automatic warning devices.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Mobile equipment; automatic warning devices. 77... UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.410 Mobile equipment; automatic warning devices. (a) Mobile equipment such as front-end loaders, forklifts, tractors, graders, and trucks, except...

  12. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  13. 33 CFR 104.260 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... procedures for identifying and responding to security system and equipment failures or malfunctions. ...

  14. Online Reference Service--How to Begin: A Selected Bibliography.

    Science.gov (United States)

    Shroder, Emelie J., Ed.

    1982-01-01

    Materials in this bibliography were selected and recommended by members of the Use of Machine-Assisted Reference in Public Libraries Committee, Reference and Adult Services Division, American Library Association. Topics include: financial aspects, equipment and communications considerations, comparing databases and database systems, advertising…

  15. Underground coal mining - methods, equipment developments and trends

    Energy Technology Data Exchange (ETDEWEB)

    Singhal, R

    1988-12-01

    Underground mines are truly beginning to accept the so-called 'high tech' technology evident in other industries. Automation, remote control and robotics have taken an added significance. Wireless communication, mine-wide equipment health and performance monitoring, and transmission of data from deeper levels to surface is moving towards becoming the norm. There is emphasis on developing and applying continuous mining systems, as well as on modifying cyclical discontinuous methods to continuous systems. Multi-purpose equipment is also being developed. Technology transfer is playing its role - equipment and systems from surface coal mining are being applied to underground mining and vice-versa. At the American Mining Congress Exhibition held in Chicago in April 1988, a variety of equipment for underground mining was displayed including coal face equipment such as shearer loaders, conveyors and powered supports, and equipment for room-and-pillar coal mining. The trend continues to be towards high power machines equipped with a variety of electronics and sensors, safety devices, and alarm systems. Ancillary equipment on display covered a variety of cutting drums, cutting tools, conveying equipment and so on. In room-and-pillar mining, the overall emphasis was on moving away from the cyclical nature of the work. Transportation by shuttle cars must be replaced by continuous transport systems such as conveyors. Experience from Australia has shown that the application of continuous haulage and breaker line supports has permitted a doubling of production from room-and-pillar systems. Production levels of 3,000tpd have already been achieved, and 4,000tpd is considered achievable.

  16. Qualification of a digital radiographic equipment for thin weld inspection

    International Nuclear Information System (INIS)

    Boulanger, G.; Furlan, J.

    1988-04-01

    The level of quality asked for welding plugs to fuel pins requires to test all the welds, that is to say about 200 000 welds of the fuel assemblies of the fast reactor Super-Phenix. X-ray radiography is one of the tests. Before the operation was done on a film by the personnel automatic selection of tested material and image processing are substituted to the film in the digital radiographic equipment IRENE. Main advantages are: elimination of human factor in defect appreciation, reliability of image processing and instant availability. On 1000 welds a good correlation is obtained between results on films and those of image processing [fr

  17. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  18. Nuclear Technology. Course 32: Nondestructive Examination (NDE) Techniques II. Module 32-4, Operation of Magnetic Particle Test Equipment.

    Science.gov (United States)

    Groseclose, Richard

    This fourth in a series of six modules for a course titled Nondestructive Examination (NDE) Techniques II describes the specific technique variables and options which are available to the test technician, provides instructions for selecting and operating the appropriate test equipment, describes physical criteria for detectable discontinuities,…

  19. Electronic quality control on dental x-rays equipment

    International Nuclear Information System (INIS)

    Pomares C, Martin

    1996-09-01

    A brief description of dental x-ray equipment is done. The non-invasive quality control is treated as than the responsibilities from the dentists to the patient and the equipment. A propose for quality control for dental x-ray equipment, film and developer is include

  20. 14 CFR 121.303 - Airplane instruments and equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane instruments and equipment. 121.303... Airplane instruments and equipment. (a) Unless otherwise specified, the instrument and equipment... airspeed limitation and item of related information in the Airplane Flight Manual and pertinent placards...

  1. Analysis of licensed South African diagnostic imaging equipment ...

    African Journals Online (AJOL)

    Analysis of licensed South African diagnostic imaging equipment. ... Pan African Medical Journal ... Introduction: Objective: To conduct an analysis of all registered South Africa (SA) diagnostic radiology equipment, assess the number of equipment units per capita by imaging modality, and compare SA figures with published ...

  2. Calibration of laboratory equipment and its intermediate verification

    International Nuclear Information System (INIS)

    Remedi, Jorge O.

    2011-01-01

    When a laboratory wants to prove that he has technical competence to carry out tests or calibrations must demonstrate that it has complied with certain requirements that establish , among others, the mandatory : calibrate or verify equipment before putting it into service in order to ensure that it meets to the specifications of laboratory equipment to keep records evidencing the checks that equipment complies with the specification ; perform intermediate checks for maintain confidence in the calibration status of the equipment , ensure that the operation is checked and calibration status of equipment when the equipment goes outside the direct control of the laboratory , before be returned to service, establish a program and procedure for the calibration of equipment; show how determined the calibration periods of their equipment as well as evidence that intermediate checks are suitable for the calibration periods. However, some confusion is observed as to the meaning of the terms 'calibration' and 'verification' of a computer. This paper analyzes applicable documentation and suggests that the differences are generated in part by translations and by characterization concepts upon its usage, that is, if it is legal metrology or assessment conformity. Therefore, this study aims to characterize both concepts , fundamentals to zoom distinguish , outline appropriate strategies for calibration and verification activities to ensure the compliance with regulatory requirements [es

  3. 21 CFR 1250.67 - Watering equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as...

  4. 47 CFR 18.203 - Equipment authorization.

    Science.gov (United States)

    2010-10-01

    ... information already on file with the Commission. (2) A technical report pursuant to §§ 18.207 and 18.311. (b... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT...

  5. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  6. Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, B. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Musolino, S. V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Klemic, G. [US Dept. of Homeland Security National Security Technology Lab., New York, NY (United States)

    2017-06-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence management missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.

  7. History and development of the tennis equipment

    OpenAIRE

    Horáková, Kateřina

    2007-01-01

    Title: History and development of the tennis equipment. Aim of the work: Process an integral, tabular and synoptic historical development overview of the tennis equipment. This owerview will cover the period since the early beginnings of the game to present days. Methods: Advance work has historical charakter therefore used methods are historiogaphical methods such as chronological method and historical method. Results: Produce tabular description of the tennis equipment by means of reading a...

  8. The Preliminary Prototype of Medium Dose Rate Brachytherapy Equipment

    Directory of Open Access Journals (Sweden)

    A. Satmoko

    2013-08-01

    Full Text Available A preliminary prototype of a brachytherapy equipment has been constructed. The work started by developing conceptual design, followed by basic design and detailed design. In the conceptual design, design requirements are stated. In the basic design, technical specifications for main components are determined. In detailed design, general drawings are discussed. The prototype consists of three main systems: a mechanical system, an instrumentation system, and a safety system. The mechanical system assures the movement mechanism of the isotope source position beginning from the standby position until the applicators. It consists of three main modules: a position handling module, a container module, and a channel distribution module. The position handling module serves to move the isotope source position. As shielding, the second module is to store the source when the equipment is in standby position. The prototype provides 12 output channels. The channel selection is performed by the third module. The instrumentation system controls the movement of source position by handling motor operations. It consists of several modules. A microcontroller module serves as a control center whose task includes both controlling motors and communicating with computer. A motor module serves to handle motors. 10 sensors, including their signal conditionings, are introduced to read the environment conditions of the equipment. LEDs are used to display these conditions. In order to facilitate the operators’ duty, communication via RS232 is provided. The brachytherapy equipment can therefore be operated by using computer. Interface software is developed using C# language. To complete both mechanical and instrumentation systems performance, a safety system is developed to make sure that the safety for operator and patients from receiving excessive radiation. An interlock system is introduced to guard against abnormal conditions. In the worst case, a manual intervention

  9. 23 CFR 635.106 - Use of publicly owned equipment.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.106 Use of publicly owned equipment. (a) Publicly owned equipment should not normally compete with privately owned equipment on a project to be let to contract... publicly owned equipment is to be made available in connection with construction work to be let to contract...

  10. 21 CFR 870.4200 - Cardiopulmonary bypass accessory equipment.

    Science.gov (United States)

    2010-04-01

    ... Cardiopulmonary bypass accessory equipment. (a) Identification. Cardiopulmonary bypass accessory equipment is a... mounting bracket or system-priming equipment. (b) Classification. (1) Class I. The device is classified as class I if it does not involve an electrical connection to the patient. The device is exempt from the...

  11. 14 CFR 125.203 - Communication and navigation equipment.

    Science.gov (United States)

    2010-01-01

    ... within the degree of accuracy required for ATC; (ii) One marker beacon receiver providing visual and... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation equipment. 125... Equipment Requirements § 125.203 Communication and navigation equipment. (a) Communication equipment—general...

  12. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  13. Performance Measurement of Mining Equipments by Utilizing OEE

    Directory of Open Access Journals (Sweden)

    Sermin Elevli

    2010-10-01

    Full Text Available Over the past century, open pit mines have steadily increased their production rate by using larger equipments which requireintensive capital investment. Low commodity prices have forced companies to decrease their unit cost by improving productivity. Oneway to improve productivity is to utilize equipment as effectively as possible. Therefore, the accurate estimation of equipmenteffectiveness is very important so that it can be increased. Overall Equipment Effectiveness (OEE is a well-known measurementmethod, which combines availability, performance and quality, for the evaluation of equipment effectiveness in manufacturing industry.However, there isn’t any study in literature about how to use this metric for mining equipments such as shovel, truck, drilling machineetc. This paper will discuss the application of OEE to measure effectiveness of mining equipment. It identifies causes of time losses forshovel and truck operations and introduces procedure to record time losses. The procedure to estimate OEE of shovels and trucks hasalso been presented via numerical example.

  14. Base Stabilization Guidance and Additive Selection for Pavement Design and Rehabilitation

    Science.gov (United States)

    2017-12-01

    Significant improvements have been made in base stabilization practice that include design specifications and methodology, experience with the selection of stabilizing additives, and equipment for distribution and uniform blending of additives. For t...

  15. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Curd mill and miscellaneous equipment. 58.419 Section... Service 1 Equipment and Utensils § 58.419 Curd mill and miscellaneous equipment. Knives, hand rakes... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  16. Evaluation of the secondary radiation impact on personnel during the dismantling of contaminated nuclear equipment

    Directory of Open Access Journals (Sweden)

    Stankunas Gediminas

    2013-01-01

    Full Text Available The article contains a numerical analysis of the secondary radiation contribution to the total radiation affecting the operational personnel during the dismantling activities of the contaminated equipment at a nuclear power plant. This study considers a widely applicable Monte Carlo particle transport code MCNPX and real Ignalina nuclear power plant records. A simplified albedo method is investigated in order to analyze the selected geometrical design cases. Additionally, the impact of the secondary radiation on the personnel dose was analyzed. The numerical MCNPX simulation allowed ascertaining the optimal distance between the source and the wall for the working personnel in closed rooms with contaminated equipment. The developed dose rate maps of the secondary radiation showed cross-sectional distribution of the dose rate inside the enclosed area.

  17. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    2011-04-09

    Apr 9, 2011 ... standards and increased use of disposable anesthetic equipment. An audit of equipment and facilities for anesthetic care in pediatric patients is important and should be carried out periodically to appraise the situation for upgrading of essential anesthetic facilities and equipment. Appendix A. 18th March, ...

  18. 14 CFR 91.213 - Inoperative instruments and equipment.

    Science.gov (United States)

    2010-01-01

    ... specific operations by this part. (c) A person authorized to use an approved Minimum Equipment List issued... a master minimum equipment list has not been developed; or (ii) Small rotorcraft, nonturbine-powered small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...

  19. 21 CFR 211.67 - Equipment cleaning and maintenance.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment cleaning and maintenance. 211.67 Section 211.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... Equipment cleaning and maintenance. (a) Equipment and utensils shall be cleaned, maintained, and, as...

  20. 42 CFR 409.14 - Supplies, appliances, and equipment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Supplies, appliances, and equipment. 409.14 Section... Hospital Services § 409.14 Supplies, appliances, and equipment. (a) Except as specified in paragraph (b) of this section, Medicare pays for supplies, appliances, and equipment as inpatient hospital or inpatient...