  1. A new method of knowledge processing for equipment diagnosis of nuclear power plants

    International Nuclear Information System (INIS)

    Fujii, M.; Fukumoto, A.; Tai, I.; Morioka, T.

    1987-01-01

    In this work, the authors complete the development of a new knowledge processing method and representation for equipment diagnosis of nuclear power plants and evaluate its functions by applying to the maintenance and diagnosis support system of the reactor instrumentation. This knowledge processing method system is based on the Cause Generation and Checking concept and has sufficient performance not only in the diagnosis function but also in the man-machine interfacing function. The maintenance and diagnosis support system based on this method leads to the possibility for users to diagnose various phenomena occurred in an objective equipment to the considerable extent by consulting with the system, even if they don't have enough knowledge. With this system, it becomes easy for operators or plant engineers to take immediate actions to counteract against the abnormality. The maintainability of the equipments is improved and MTTR (Mean Time To Repair) is expected to be shorter. This new knowledge processing method is proved to be suited for fault diagnosis of the equipments of nuclear power plants

  2. Condition based monitoring, diagnosis and maintenance on operating equipments of a hydraulic generator unit

    International Nuclear Information System (INIS)

    Liu, X T; Feng, F Z; Si, A W

    2012-01-01

    According to performance characteristics of operating equipments in a hydraulic generator unit (HGU), the relative techniques on condition monitoring and fault diagnosis (CMFD) are introduced in this paper, especially the key technologies are emphasized, such as equipment monitoring, expert system (ES), intelligent diagnosis and condition based maintenance (CBM). Meanwhile, according to the instructor on CBM proposed by State electric power corporation, based on integrated mode, the main steps on implementation of CBM are discussed in this paper.

  3. Diagnosis of Equipment Failures by Pattern Recognition

    DEFF Research Database (Denmark)

    Pau, L. F.

    1974-01-01

    The main problems in relation to automatic fault finding and diagnosis in equipments or production systems are discussed: 1) compression of the syndrome and observation spaces for better discrimination between failure modes; 2) simultaneous display of the failure patterns and the failure instants...

  4. Fault diagnosis of nuclear-powered equipment based on HMM and SVM

    International Nuclear Information System (INIS)

    Yue Xia; Zhang Chunliang; Zhu Houyao; Quan Yanming

    2012-01-01

    For the complexity and the small fault samples of nuclear-powered equipment, a hybrid HMM/SVM method was introduced in fault diagnosis. The hybrid method has two steps: first, HMM is utilized for primary diagnosis, in which the range of possible failure is reduced and the state trends can be observed; then faults can be recognized taking the advantage of the generalization ability of SVM. Experiments on the main pump failure simulator show that the HMM/SVM system has a high recognition rate and can be used in the fault diagnosis of nuclear-powered equipment. (authors)

  5. A Model of Intelligent Fault Diagnosis of Power Equipment Based on CBR

    Directory of Open Access Journals (Sweden)

    Gang Ma

    2015-01-01

    Full Text Available Nowadays the demand of power supply reliability has been strongly increased as the development within power industry grows rapidly. Nevertheless such large demand requires substantial power grid to sustain. Therefore power equipment’s running and testing data which contains vast information underpins online monitoring and fault diagnosis to finally achieve state maintenance. In this paper, an intelligent fault diagnosis model for power equipment based on case-based reasoning (IFDCBR will be proposed. The model intends to discover the potential rules of equipment fault by data mining. The intelligent model constructs a condition case base of equipment by analyzing the following four categories of data: online recording data, history data, basic test data, and environmental data. SVM regression analysis was also applied in mining the case base so as to further establish the equipment condition fingerprint. The running data of equipment can be diagnosed by such condition fingerprint to detect whether there is a fault or not. Finally, this paper verifies the intelligent model and three-ratio method based on a set of practical data. The resulting research demonstrates that this intelligent model is more effective and accurate in fault diagnosis.

  6. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  7. Truck circuits diagnosis for railway lines equipped with an automatic block signalling system

    Science.gov (United States)

    Spunei, E.; Piroi, I.; Muscai, C.; Răduca, E.; Piroi, F.

    2018-01-01

    This work presents a diagnosis method for detecting track circuits failures on a railway traffic line equipped with an Automatic Block Signalling installation. The diagnosis method uses the installation’s electrical schemas, based on which a series of diagnosis charts have been created. Further, the diagnosis charts were used to develop a software package, CDCBla, which substantially contributes to reducing the diagnosis time and human error during failure remedies. The proposed method can also be used as a training package for the maintenance staff. Since the diagnosis method here does not need signal or measurement inputs, using it does not necessitate additional IT knowledge and can be deployed on a mobile computing device (tablet, smart phone).

  8. Performance testing of medical US equipment using US phantom (ATS-539)

    International Nuclear Information System (INIS)

    Kim, Do Hyung; Kwon, Deok Moon

    2014-01-01

    This study is to provide accurate information as medical imaging equipment to check for the presence of body disease US equipment. We investigated the status of medical US equipment performance in Daegu and criteria US phantom (ATS-539) for US equipment performance measurements. The results in this study, 1. US phantom measurement results: The test passed rate were 88.6% and the failed rate were 11.4%. 2. The difference between the group of mean and the pass/failed groups were statistically significant. Focal zone and 4 mm functional resolution in the two items that are not present the passing standard. 3. The difference was statistically significant number of years and used equipment and pass the failed equipment (4.13 vs 7.25 years). We investigated the performance status of US equipment used in the clinical area in Daegu. The basis for the two items are not present this proposed passing standard. Equipment performance was associated with the number of years of using US equipment. It is necessary to maintain the best performance of the equipment phantom measurements for performance testing of US equipment

  9. Performance testing of medical US equipment using US phantom (ATS-539)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Do Hyung [Daegu Branch, Korea Association of Health Promotion, Daegu (Korea, Republic of); Kwon, Deok Moon [Dept. of Radiology, Daegu Health College, Daegu (Korea, Republic of)

    2014-12-15

    This study is to provide accurate information as medical imaging equipment to check for the presence of body disease US equipment. We investigated the status of medical US equipment performance in Daegu and criteria US phantom (ATS-539) for US equipment performance measurements. The results in this study, 1. US phantom measurement results: The test passed rate were 88.6% and the failed rate were 11.4%. 2. The difference between the group of mean and the pass/failed groups were statistically significant. Focal zone and 4 mm functional resolution in the two items that are not present the passing standard. 3. The difference was statistically significant number of years and used equipment and pass the failed equipment (4.13 vs 7.25 years). We investigated the performance status of US equipment used in the clinical area in Daegu. The basis for the two items are not present this proposed passing standard. Equipment performance was associated with the number of years of using US equipment. It is necessary to maintain the best performance of the equipment phantom measurements for performance testing of US equipment.

  10. Heat transfer equipment performance diagnosis of auxiliary systems in electric power stations; Diagnostico de comportamiento de equipo de transferencia de calor de sistemas auxiliares de centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz Esparza Gutierrez, Rogelio [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1991-12-31

    In this article the methodology followed to diagnose the performance of the equipment where heat is transferred from the feed water, condensate and circulation water systems in fossil power plants (FPP). The data collection is made with the unit in normal operation, using local instrumentation without taking the equipment out of service for its installation. The equipment diagnosis is made through the analysis of the collected data in actual operation and the design data; for this purpose a thermal balance of the interested systems is performed to obtain all the conditions an operation data. Later on the performance indicative parameters (PIP) of actual operation and design are calculated and compared one against the other. Such a comparison reveals the performance deterioration and the possible equipment faults. The data obtained and the supplementary information are stored in a data base whose objective is that Comision Federal de Electricidad has on hand a prompt access to them in order to control the performance, compare them among similar units and power stations, and inclusively verify possible recurrent causes of low availability in the referred systems. [Espanol] En este articulo se presenta la metodologia seguida para diagnosticar el comportamiento de equipos en los que se transfiere calor de los sistemas de agua de alimentacion, condensado y circulacion de las centrales termoelectricas (CTE). La toma de datos se realiza con la unidad en operacion normal, utilizando instrumentacion local sin necesidad de sacar de servicio a los equipos para su instalacion, ya que se ocupan los mismos puntos para instrumentos con que cuentan por diseno. El diagnostico de los equipos se realiza mediante el analisis de los datos recopilados, tanto de operacion real como de diseno; para ello, se efectua un balance termico de los sistemas de interes para obtener todas las condiciones y los datos de operacion. Posteriormente, se calculan los parametros indicativos de

  11. Heat transfer equipment performance diagnosis of auxiliary systems in electric power stations; Diagnostico de comportamiento de equipo de transferencia de calor de sistemas auxiliares de centrales termoelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz Esparza Gutierrez, Rogelio [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1990-12-31

    In this article the methodology followed to diagnose the performance of the equipment where heat is transferred from the feed water, condensate and circulation water systems in fossil power plants (FPP). The data collection is made with the unit in normal operation, using local instrumentation without taking the equipment out of service for its installation. The equipment diagnosis is made through the analysis of the collected data in actual operation and the design data; for this purpose a thermal balance of the interested systems is performed to obtain all the conditions an operation data. Later on the performance indicative parameters (PIP) of actual operation and design are calculated and compared one against the other. Such a comparison reveals the performance deterioration and the possible equipment faults. The data obtained and the supplementary information are stored in a data base whose objective is that Comision Federal de Electricidad has on hand a prompt access to them in order to control the performance, compare them among similar units and power stations, and inclusively verify possible recurrent causes of low availability in the referred systems. [Espanol] En este articulo se presenta la metodologia seguida para diagnosticar el comportamiento de equipos en los que se transfiere calor de los sistemas de agua de alimentacion, condensado y circulacion de las centrales termoelectricas (CTE). La toma de datos se realiza con la unidad en operacion normal, utilizando instrumentacion local sin necesidad de sacar de servicio a los equipos para su instalacion, ya que se ocupan los mismos puntos para instrumentos con que cuentan por diseno. El diagnostico de los equipos se realiza mediante el analisis de los datos recopilados, tanto de operacion real como de diseno; para ello, se efectua un balance termico de los sistemas de interes para obtener todas las condiciones y los datos de operacion. Posteriormente, se calculan los parametros indicativos de

  12. Application of Equipment Monitoring Technology in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kang, H. T.; Lee, J. K.; Lee, K. D.; Jo, S. H.

    2012-01-01

    The major goal of nuclear power industries during the past 10 years is to increase reliability and utility capacity factor. As the capacitor factor, however, crept upward. it became harder to attain next percentage of improvement. Therefore other innovative technologies are required. By the technologies applied to the fossil power plants, equipment health monitoring was performed on equipment to maintain it in operable condition and contributed on improving their reliability a lot. But the equipment monitoring may be limited to the observation of current system states in nuclear power plant. Monitoring of current system states is being augmented with prediction of future operating states and predictive diagnosis of future failure states. Such predictive diagnosis is motivated by the need for nuclear power plants to optimize equipment performance and reduce costs and unscheduled downtime. This paper reviews the application of techniques that focus on improving reliability in nuclear power plant by monitoring and predicting equipment health and suggests how possible to support on-line monitoring

  13. Review of the regulation on the installation and use of X-ray equipment for medical diagnosis

    International Nuclear Information System (INIS)

    Alvarez Garcia, C.; Arguelles Sanchez, R.; Franco Artero, P.; Gil Gahete, M.; Rodriguez Marti, M.; Rueda Guerrero, M. D.; Villarroel Gonzalez-Eipe, R.

    2009-01-01

    The first regulation on the installation and use of X-ray equipment for the purposes of medical diagnosis was approved in 1991. This allowed the control of the safety of such equipment to be significantly improved. Royal Decree 1891/1991 has now been subjected to a review to update its contents and include the regulatory changes that have been incorporated in later standards, this having materialised with the Royal Decree 1085/2009, of July 3rd. (Author)

  14. A Fault Diagnosis Model of Surface to Air Missile Equipment Based on Wavelet Transformation and Support Vector Machine

    Directory of Open Access Journals (Sweden)

    Zhheng Ni

    2016-01-01

    Full Text Available At present, the fault signals of surface to air missile equipment are hard to collect and the accuracy of fault diagnosis is very low. To solve the above problems, based on the superiority of wavelet transformation on processing non-stationary signals and the advantage of SVM on pattern classification, this paper proposes a fault diagnosis model and takes the typical analog circuit diagnosis of one power distribution system as an example to verify the fault diagnosis model based on Wavelet Transformation and SVM. The simulation results show that the model is able to achieve fault diagnosis based on a small amount of training samples, which improves the accuracy of fault diagnosis.

  15. Equipment size effects on open pit mining performance

    Energy Technology Data Exchange (ETDEWEB)

    A. Bozorgebrahimi; R.A. Hall; M.A. Morin [University of British Columbia, Vancouver, BC (Canada). Mining Engineering Department

    2005-03-01

    This paper discusses the exploitation of economies of scale in open pit mining through the use of increasingly larger equipment. It presents a method adopted to evaluate the impact of increased scale on operational performance factors. The work identifies equipment size sensitive variables (ESSVs) in the mine design process that affect the performance of the production process. Data from a set of case studies show that the ESSV influence extends beyond mine production to encompass milling performance, environmental footprint and community impacts. Some ESSVs (such as reliability, tyre costs and productivity) are shown to be related to the current state of equipment technology and their effects are therefore comparable for different mines. Other ESSVs relate to the mine and deposit characteristics; their effects therefore vary from mine to mine. A detailed analytical approach, developed to model the impact of ESSVs, suggests that for truck/shovel operations, the industry may be approaching a situation of diseconomies of scale.

  16. Human performance for the success of equipment reliability programs

    International Nuclear Information System (INIS)

    Woodcock, J.

    2007-01-01

    Human performance is a critical element of programs directed at equipment reliability. Reliable equipment performance requires broad support from all levels of plant management and throughout all plant departments. Experience at both nuclear power plants and fuel manufacturing plants shows that human performance must be addressed during all phases of program implementation from the beginning through the establishment of a living, on-going process. At the beginning, certain organizational and management actions during the initiation of the program set the stage for successful adoption by station personnel, leading to more rapid benefits. For the long term, equipment reliability is a living process needed throughout the lifetime of a station, a program which must be motivated and measured. Sustained acceptance and participation by the plant personnel is a requirement, and culture is a key ingredient. This paper will provide an overview of key human performance issues to be considered, using the application of the INPO AP-913 Equipment Reliability Guideline as a basis and gives some best practices for training, communicating and implementing programs. The very last part includes ways to tell if the program is effective

  17. Performance Measurement of Mining Equipments by Utilizing OEE

    Directory of Open Access Journals (Sweden)

    Sermin Elevli

    2010-10-01

    Full Text Available Over the past century, open pit mines have steadily increased their production rate by using larger equipments which requireintensive capital investment. Low commodity prices have forced companies to decrease their unit cost by improving productivity. Oneway to improve productivity is to utilize equipment as effectively as possible. Therefore, the accurate estimation of equipmenteffectiveness is very important so that it can be increased. Overall Equipment Effectiveness (OEE is a well-known measurementmethod, which combines availability, performance and quality, for the evaluation of equipment effectiveness in manufacturing industry.However, there isn’t any study in literature about how to use this metric for mining equipments such as shovel, truck, drilling machineetc. This paper will discuss the application of OEE to measure effectiveness of mining equipment. It identifies causes of time losses forshovel and truck operations and introduces procedure to record time losses. The procedure to estimate OEE of shovels and trucks hasalso been presented via numerical example.

  18. Experience of safety and performance improvement for fuel handling equipment

    International Nuclear Information System (INIS)

    Gyoon Chang, Sang; Hee Lee, Dae

    2014-01-01

    The purpose of this study is to provide experience of safety and performance improvement of fuel handling equipment for nuclear power plants in Korea. The fuel handling equipment, which is used as an important part of critical processes during the refueling outage, has been improved to enhance safety and to optimize fuel handling procedures. Results of data measured during the fuel reloading are incorporated into design changes. The safety and performance improvement for fuel handling equipment could be achieved by simply modifying the components and improving the interlock system. The experience provided in this study can be useful lessons for further improvement of the fuel handling equipment. (authors)

  19. Assessment of the performance of containment and surveillance equipment part 1: methodology

    International Nuclear Information System (INIS)

    Rezniczek, A.; Richter, B.

    2009-01-01

    Equipment performance aims at the creation of relevant data. As Containment and Surveillance (C/S) is playing an ever increasing role in safeguards systems, the issue of how to assess the performance of C/S equipment is being addressed by the ESARDA Working Group on C/S. The issue is important not only for the development of appropriate safeguards approaches but also for the review of existing approaches with regard to the implementation of the Additional Protocol (A P) and Integrated Safeguards. It is expected that the selection process of appropriate equipment, especially for unattended operation, is facilitated by the availability of methods to determine the performance of such equipment. Apart from EURATOM, the users of assessment methodologies would be the International Atomic Energy Agency (IAEA), plant operators, and instrument developers. The paper describes a non-quantitative performance assessment methodology. A structured procedure is outlined that allows assessing the suitability of different C/S instrumentation to comply with the objectives of its application. The principle to determine the performance of C/S equipment is to define, based on safeguards requirements, a task profile and to check the performance profile against the task profile. The performance profile of C/S equipment can be derived from the functional specifications and design basis tolerances provided by the equipment manufacturers.

  20. Fault Diagnosis Method of Polymerization Kettle Equipment Based on Rough Sets and BP Neural Network

    Directory of Open Access Journals (Sweden)

    Shu-zhi Gao

    2013-01-01

    Full Text Available Polyvinyl chloride (PVC polymerizing production process is a typical complex controlled object, with complexity features, such as nonlinear, multivariable, strong coupling, and large time-delay. Aiming at the real-time fault diagnosis and optimized monitoring requirements of the large-scale key polymerization equipment of PVC production process, a real-time fault diagnosis strategy is proposed based on rough sets theory with the improved discernibility matrix and BP neural networks. The improved discernibility matrix is adopted to reduct the attributes of rough sets in order to decrease the input dimensionality of fault characteristics effectively. Levenberg-Marquardt BP neural network is trained to diagnose the polymerize faults according to the reducted decision table, which realizes the nonlinear mapping from fault symptom set to polymerize fault set. Simulation experiments are carried out combining with the industry history datum to show the effectiveness of the proposed rough set neural networks fault diagnosis method. The proposed strategy greatly increased the accuracy rate and efficiency of the polymerization fault diagnosis system.

  1. Development of process diagnostic techniques for piping and equipment

    International Nuclear Information System (INIS)

    Yotsutsuji, Mitoshi

    1987-01-01

    The thing required for using the facilities composing a plant for a long period without anxiety is to quantitatively grasp the quantities of the present condition of the facilities and to take the necessary measures beforehand. For this purpose, the diagnostic techniques for quickly and accurately detect the quantities of the condition of facilities are necessary, and the development of process diagnostic techniques has been desired. The process diagnostic techniques mentioned here mean those for diagnosing the contamination, clogging and performance of towers, tanks, heat exchangers and others. Idemitsu Engineering Co. had developed a simplified diagnostic equipment for detecting the state of fouling in piping in 1982, which is the gamma ray transmission diagnosis named Scale Checker. By further improving it, the process diagnostic techniques for piping and equipment were developed. In this report, the course of development and examination, the principle of detection, the constitution and the examination of remodeling of the Scale Checker are reported. As the cases of process diagnosis in plant facilities, the diagnosis of the clogging in process piping and the diagnosis of the performance of a distillation tower were carried out. The contents of the diagnosis and the results of those cases are explained. (Kako, I.)

  2. Purex: process and equipment performance

    International Nuclear Information System (INIS)

    Orth, D.A.

    1986-01-01

    The Purex process is the solvent extraction system that uses tributyl phosphate as the extractant for separating uranium and plutonium from irradiated reactor fuels. Since the first flowsheet was proposed at Oak Ridge National Laboratory in 1950, the process has endured for over 30 years with only minor modifications. The spread of the technology was rapid, and worldwide use or research on Purex-type processes was reported by the time of the 1955 Geneva Conference. The overall performance of the process has been so good that there are no serious contenders for replacing it soon. This paper presents: process description; equipment performance (mixer-settlers, pulse columns, rapid contactors); fission product decontamination; solvent effects (solvent degradation products); and partitioning of uranium and plutonium

  3. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  4. Equipment-free nucleic acid extraction and amplification on a simple paper disc for point-of-care diagnosis of rotavirus A.

    Science.gov (United States)

    Ye, Xin; Xu, Jin; Lu, Lijuan; Li, Xinxin; Fang, Xueen; Kong, Jilie

    2018-08-14

    The use of paper-based methods for clinical diagnostics is a rapidly expanding research topic attracting a great deal of interest. Some groups have attempted to realize an integrated nucleic acid test on a single microfluidic paper chip, including extraction, amplification, and readout functions. However, these studies were not able to overcome complex modification and fabrication requirements, long turn-around times, or the need for sophisticated equipment like pumps, thermal cyclers, or centrifuges. Here, we report an extremely simple paper-based test for the point-of-care diagnosis of rotavirus A, one of the most common pathogens that causes pediatric gastroenteritis. This paper-based test could perform nucleic acid extraction within 5 min, then took 25 min to amplify the target sequence, and the result was visible to the naked eye immediately afterward or quantitative by the UV-Vis absorbance. This low-cost method does not require extra equipment and is easy to use either in a lab or at the point-of-care. The detection limit for rotavirus A was found to be 1 × 10 3 copies/mL. In addition, 100% sensitivity and specificity were achieved when testing 48 clinical stool samples. In conclusion, the present paper-based test fulfills the main requirements for a point-of-care diagnostic tool, and has the potential to be applied to disease prevention, control, and precision diagnosis. Copyright © 2018 Elsevier B.V. All rights reserved.

  5. Electrical equipment performance under severe accident conditions (BWR/Mark 1 plant analysis): Summary report

    International Nuclear Information System (INIS)

    Bennett, P.R.; Kolaczkowski, A.M.; Medford, G.T.

    1986-09-01

    The purpose of the Performance Evaluation of Electrical Equipment during Severe Accident States Program is to determine the performance of electrical equipment, important to safety, under severe accident conditions. In FY85, a method was devised to identify important electrical equipment and the severe accident environments in which the equipment was likely to fail. This method was used to evaluate the equipment and severe accident environments for Browns Ferry Unit 1, a BWR/Mark I. Following this work, a test plan was written in FY86 to experimentally determine the performance of one selected component to two severe accident environments

  6. Review on Fuel Loading Process and Performance for Advanced Fuel Handling Equipment

    International Nuclear Information System (INIS)

    Chang, Sang-Gyoon; Lee, Dae-Hee; Kim, Young-Baik; Lee, Deuck-Soo

    2007-01-01

    The fuel loading process and the performance of the advanced fuel handling equipment for OPR 1000 (Optimized Power Plant) are analyzed and evaluated. The fuel handling equipment, which acts critical processes in the refueling outage, has been improved to reduce fuel handling time. The analysis of the fuel loading process can be a useful tool to improve the performance of the fuel handling equipment effectively. Some recommendations for further improvement are provided based on this study

  7. Performance based fault diagnosis

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik

    2002-01-01

    Different aspects of fault detection and fault isolation in closed-loop systems are considered. It is shown that using the standard setup known from feedback control, it is possible to formulate fault diagnosis problems based on a performance index in this general standard setup. It is also shown...

  8. Reliability performance of standby equipment with periodic testing

    International Nuclear Information System (INIS)

    Sim, S.H.

    1985-11-01

    In this report, the reliability performance of standby equipment subjected to periodic testing is studied. analytical expressions have been derived for reliability measures, such as the man accumulated operating time to failure, the expected number of tests between two consecutive failures, the mean time to failure following an emergency start-up and the probability of failing to complete an emergency mission of a specified duration. These results are useful for the reliability assessment of standby equipment such as combustion turbine units of the emergency power supply system, and of the Class III power system at a nuclear generating station

  9. Terms standardization between the rules of diagnosis radiation equipment safety management and atomic energy law: problems and suggestions

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hwa Gon; Kang, Se Sik; Kim, Chang Soo; Park, Cheol Seo [Catholic University of Pusan, Busan (Korea, Republic of)

    2006-03-15

    The rules and terms are described different meaning in this results the research is accomplished for preventing practical workers from confusion. Atomic law are kept up modification and development in our situation by the ICRP's recommendation, on the other hand, the rules of diagnosis radiation equipment safety managements are modified partial, then resulted in confusion. The study was comparison between the rules of diagnosis radiation equipment safety management and atomic energy law, and the modification items obtained were as follows. With each other different the terms and units are used. With the exception of special terms for affairs usage, it is needless to say that common term uniformity is standardized. The standardization of rules and guidance have not need to confusion radiological practical workers. The following is omitted. The radiation protection against the patient and the hospital visitor. Radiation dose limit of the woman patient who is in the process of becoming pregnant. Radiation dose limit of the person who is not regarded as medical exposure. The control of the exposure of pregnant of women at work.

  10. Terms standardization between the rules of diagnosis radiation equipment safety management and atomic energy law: problems and suggestions

    International Nuclear Information System (INIS)

    Kim, Hwa Gon; Kang, Se Sik; Kim, Chang Soo; Park, Cheol Seo

    2006-01-01

    The rules and terms are described different meaning in this results the research is accomplished for preventing practical workers from confusion. Atomic law are kept up modification and development in our situation by the ICRP's recommendation, on the other hand, the rules of diagnosis radiation equipment safety managements are modified partial, then resulted in confusion. The study was comparison between the rules of diagnosis radiation equipment safety management and atomic energy law, and the modification items obtained were as follows. With each other different the terms and units are used. With the exception of special terms for affairs usage, it is needless to say that common term uniformity is standardized. The standardization of rules and guidance have not need to confusion radiological practical workers. The following is omitted. The radiation protection against the patient and the hospital visitor. Radiation dose limit of the woman patient who is in the process of becoming pregnant. Radiation dose limit of the person who is not regarded as medical exposure. The control of the exposure of pregnant of women at work

  11. Assessment of the performance of containment and surveillance equipment part 2: trial application

    International Nuclear Information System (INIS)

    Rezniczek, A.; Richter, B.; Jussofie, A.

    2009-01-01

    The adopted methodological approach for assessing the performance of Containment and Surveillance (C/S) equipment resulted from an account of work performed for and in cooperation with the ESARDA Working Group on C/S. It was applied on a trial basis to a dry storage facility for spent nuclear fuel and consisted of the following steps: (1) Acquisition and analysis of design information and operational characteristics of the facility under consideration, (2) assumptions on diversion and misuse scenarios, (3) assumptions on safeguards approach and definition of safeguards requirements, (4) compilation and characterisation of candidate C/S equipment, (5) performance assessment of C/S equipment. The candidate equipment taken into account was routinely used by the IAEA: DCM14-type camera, Type E capand- wire seal, COBRA fibre optic seal, and VACOSS electronic seal. Four applications were considered: camera mounted in the reception area, seal on secondary lid of transport and storage cask, seal on protective lid, and seal on group of casks. For these applications, requirements were defined and requirement levels were attributed. The assignment of performance levels was carried out by using the technical specifications and design basis tolerances provided by the equipment manufacturers. The results were entered into four performance assessment tables. Although the assessment methodology was not yet fully developed, its trial application yielded promising results with regard to the selection of appropriate C/S equipment.

  12. Performance Evaluation and Suggestion of Upgraded Fuel Handling Equipment for Operating OPR1000

    International Nuclear Information System (INIS)

    Chang, Sang Gyoon; Hwang, Jeung Ki; Choi, Taek Sang; Na, Eun Seok; Lee, Myung Lyul; Baek, Seung Jin; Kim, Man Su; Kunik, Jack

    2011-01-01

    The purpose of this study is to evaluate the performance of upgraded FHE (Fuel Handling Equipment) for operating OPR 1000 (Optimized Power Reactor) by using data measured during the fuel reloading, and make some suggestions on enhancing the performance of the FHE. The fuel handling equipment, which serves critical processes in the refueling outage, has been upgraded to increase and improve the operational availability of the plant. The evaluation and suggestion of this study can be a beneficial tool related to the performance of the fuel handling equipment

  13. Performance of X-ray equipment used for conventional radiographic examinations of children

    International Nuclear Information System (INIS)

    Lacerda, Marco A.S.; Silva, Teogenes A. da; Khoury, Helen J.

    2009-01-01

    The performance of X-ray equipment that are used for conventional X-ray examinations of children in four hospitals of Belo Horizonte, Brazil, was evaluated. The methodology proposed by the Brazilian authority for radiation protection in diagnostic radiology was adopted. The performance tests were carried out in six X-ray machines and they consisted of measurements and determination of the X-ray tube output, linearity and constancy of radiation output, accuracy and reproducibility of the exposure time and tube potential, half-value layer (HVL), light field / X-ray field alignment and accuracy of the X-ray field indicator. It was observed that only one hospital had the suitable equipment for X-ray examinations of children. Results showed that all six equipment of the four hospitals presented unsatisfactory performance in some quality control tests. Only for some combinations of the exposure parameters, generally employed in pediatric X-ray examinations, some equipment complied with the authority requirements. (author)

  14. How does information congruence influence diagnosis performance?

    Science.gov (United States)

    Chen, Kejin; Li, Zhizhong

    2015-01-01

    Diagnosis performance is critical for the safety of high-consequence industrial systems. It depends highly on the information provided, perceived, interpreted and integrated by operators. This article examines the influence of information congruence (congruent information vs. conflicting information vs. missing information) and its interaction with time pressure (high vs. low) on diagnosis performance on a simulated platform. The experimental results reveal that the participants confronted with conflicting information spent significantly more time generating correct hypotheses and rated the results with lower probability values than when confronted with the other two levels of information congruence and were more prone to arrive at a wrong diagnosis result than when they were provided with congruent information. This finding stresses the importance of the proper processing of non-congruent information in safety-critical systems. Time pressure significantly influenced display switching frequency and completion time. This result indicates the decisive role of time pressure. Practitioner Summary: This article examines the influence of information congruence and its interaction with time pressure on human diagnosis performance on a simulated platform. For complex systems in the process control industry, the results stress the importance of the proper processing of non-congruent information in safety-critical systems.

  15. Equipment monitoring and diagnosis of their mechanical condition

    International Nuclear Information System (INIS)

    Morel, J.; Monnier, B.

    1994-01-01

    The main objectives of reactor monitoring are reviewed and the three monitoring types are described: reception controls and alarms, periodical controls, and specific monitoring. The monitoring process is then presented: information acquisition, dysfunction detection and diagnosis, risk analysis and maintenance action determination. Diagnosis assistance is now automated with expert systems such as DIVA (shaft vibration diagnosis) and DIAPO (primary pump diagnosis). Several application examples at EDF are described: SEXTEN reactor containment tightness monitoring, large and small-size turbo-machine monitoring, reactor inner structure monitoring, loose part detection in the primary circuit. All these informations will be centralized in a general monitoring and diagnosis assistance station. 3 fig

  16. Assessment of Equipment Capability to Perform Reliably under Severe Accident Conditions

    International Nuclear Information System (INIS)

    2017-07-01

    The experience from the last 40 years has shown that severe accidents can subject electrical and instrumentation and control (I&C) equipment to environmental conditions exceeding the equipment’s original design basis assumptions. Severe accident conditions can then cause rapid degradation or damage to various degrees up to complete failure of such equipment. This publication provides the technical basis to consider when assessing the capability of electrical and I&C equipment to perform reliably during a severe accident. It provides examples of calculation tools to determine the environmental parameters as well as examples and methods that Member States can apply to assess equipment reliability.

  17. ICSH recommendations for assessing automated high-performance liquid chromatography and capillary electrophoresis equipment for the quantitation of HbA2.

    Science.gov (United States)

    Stephens, A D; Colah, R; Fucharoen, S; Hoyer, J; Keren, D; McFarlane, A; Perrett, D; Wild, B J

    2015-10-01

    Automated high performance liquid chromatography and Capillary electrophoresis are used to quantitate the proportion of Hemoglobin A2 (HbA2 ) in blood samples order to enable screening and diagnosis of carriers of β-thalassemia. Since there is only a very small difference in HbA2 levels between people who are carriers and people who are not carriers such analyses need to be both precise and accurate. This paper examines the different parameters of such equipment and discusses how they should be assessed. © 2015 John Wiley & Sons Ltd.

  18. Study on intelligence fault diagnosis method for nuclear power plant equipment based on rough set and fuzzy neural network

    International Nuclear Information System (INIS)

    Liu Yongkuo; Xia Hong; Xie Chunli; Chen Zhihui; Chen Hongxia

    2007-01-01

    Rough set theory and fuzzy neural network are combined, to take full advantages of the two of them. Based on the reduction technology to knowledge of Rough set method, and by drawing the simple rule from a large number of initial data, the fuzzy neural network was set up, which was with better topological structure, improved study speed, accurate judgment, strong fault-tolerant ability, and more practical. In order to test the validity of the method, the inverted U-tubes break accident of Steam Generator and etc are used as examples, and many simulation experiments are performed. The test result shows that it is feasible to incorporate the fault intelligence diagnosis method based on rough set and fuzzy neural network in the nuclear power plant equipment, and the method is simple and convenience, with small calculation amount and reliable result. (authors)

  19. The tendency of medical electrical equipment - IEC 60601-2-54: Particular requirements for the basic safety and essential performance of x-ray equipment for radiography and radioscopy

    International Nuclear Information System (INIS)

    Roh, Young Hoon; Kim, Jung Min

    2015-01-01

    Medical electrical equipment - Part 1: General requirement for basic safety and essential performance of MFDS was revised as 3th edition and Medical electrical equipment Part 2-54: Particular requirements for the basic safety and essential performance of X-ray equipment will be expected to be announced as notification. Therefore this technical report was written to introduce provision of the particular requirements, replacement, addition, amendment. The purpose of this particular requirements is to secure requirements for basic safety and essential performance of X-ray equipment for radiography and radioscopy. X-ray high voltage generator, mechanical protective device, protection against radiation is included in this particular requirements. Medical electrical equipment - Part 1, Part 1-2, Part 1-3 is applied to this particular requirements. If the requirements is announced as notification, It is expected to widen understanding for basic safety and essential performance of X-ray equipment for radiography and radioscopy and play a part to internationalize of medical equipment

  20. Performance of indigenous resistance welding equipment for PHWR fuel fabrication in NFC

    International Nuclear Information System (INIS)

    Hemantha Rao, G.V.S.; Jayaraj, R.N.; Prakash, M.S.; Gupta, U.C.; Ganguly, C.

    1999-01-01

    Indigenisation of critical equipment for manufacturing of PHWR fuel and automation in the production line have been the main thrust in NFC in recent years. As part of this endeavour, resistance welding equipment for end plug welding of Zircaloy-4 clad Uranium Oxide fuel pin and end plates of 19-element fuel bundles have been developed. The paper discusses the equipment design features, critical operating parameters and performance of these indigenous welding machines. (author)

  1. Equipment improvements for performance enhancement

    International Nuclear Information System (INIS)

    Gaestel, P.; Guesnon, H.; Sauze, G.

    1994-01-01

    In order to enhance the reactor availability, several improvements on reactor equipment have been developed: design optimization for stator maintenance replacement in the main alternator; adjustment modification of stator coils in the main alternator for an easier maintenance; improvement of the fuel handling line (pole crane, transfer equipment, loading machine); development of a loose part trapping system in the steam generator secondary circuit. 1 tab

  2. Development of an equipment diagnostic system that evaluates sensor drift

    International Nuclear Information System (INIS)

    Kanada, Masaki; Arita, Setsuo; Tada, Nobuo; Yokota, Katsuo

    2011-01-01

    The importance of condition monitoring technology for equipment has increased with the introduction of condition-based maintenance in nuclear power plants. We are developing a diagnostic system using process signals for plant equipment, such as pumps and motors. It is important to enable the diagnostic system to distinguish sensor drift and equipment failure. We have developed a sensor drift diagnostic method that combines some highly correlative sensor signals by using the MT (Mahalanobis-Taguchi) method. Furthermore, we have developed an equipment failure diagnostic method that measures the Mahalanobis distance from the normal state of equipment by the MT method. These methods can respectively detect sensor drift and equipment failure, but there are the following problems. In the sensor drift diagnosis, there is a possibility of misjudging the sensor drift when the equipment failure occurs and the process signal changes because the behavior of the process signal is the same as that of the sensor drift. Oppositely, in the equipment failure diagnosis, there is a possibility of misjudging the equipment failure when the sensor drift occurs because the sensor drift influences the change of process signal. To solve these problems, we propose a diagnostic method combining the sensor drift diagnosis and the equipment failure diagnosis by the MT method. Firstly, the sensor drift values are estimated by the sensor drift diagnosis, and the sensor drift is removed from the process signal. It is necessary to judge the validity of the estimated sensor drift values before removing the sensor drift from the process signal. We developed a method for judging the validity of the estimated sensor drift values by using the drift distribution based on the sensor calibration data. And then, the equipment failure is diagnosed by using the process signals after removal of the sensor drifts. To verify the developed diagnostic system, several sets of simulation data based on abnormal cases

  3. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, J. C.; Kwon, K. C.; Lee, D. Y.; Hwang, I. K.; Park, W. M.; Cha, K. H.; Song, S. J.; Lee, J. W.; Kim, B. G.; Kim, H. J.

    1999-01-01

    The simulator at Nuclear Training Center in KAERI became old and has not been used effectively for nuclear-related training and researches due to the problems such as aging of the equipment, difficulties in obtaining consumables and their high cost, and less personnel available who can handle the old equipment. To solve the problems, this study was performed for recovering the functions of the simulator through the technical design and replacement of components with new ones. As results of this study, our test after the replacement showed the same simulation status as the previous one, and new graphic displays added to the simulator was effective for the training and easy for maintenance. This study is meaningful as demonstrating the way of upgrading nuclear training simulators that lost their functioning due to the obsolescence of simulators and the unavailability of components

  4. Performance characterization of night vision equipment based on Triangle Orientation Discrimination (TOD) methodology

    NARCIS (Netherlands)

    Laurent, N.; Lejard, C.; Deltel, G.; Bijl, P.

    2013-01-01

    Night vision equipment is crucial in order to accomplish supremacy and safety of the troops on the battlefield. Evidently, system integrators, MODs and end-users need access to reliable quantitative characterization of the expected field performance when using night vision equipment. The Image

  5. Failure diagnosis aiding device for plant equipment

    International Nuclear Information System (INIS)

    Uhara, Yoshihiko.

    1990-01-01

    The present invention intends to improve the efficiency of trouble shooting for equipments of industrial plants such as nuclear power plants. The device of the present invention comprises an intelligence base and an inference mechanism base. The intelligence base comprises a rule base, an information storing section having a part frame and a working frame and a user's frame. The parts frame contains the failure rate on every parts and data on related operations. The working frame contains the importance and frequency of working. The user's frame contains parameters showing the extent of user's skills. The rule base, the parts frame and the working frame can be selected in accordance with the extent of the user's skill in the inference mechanism. With such a constitution, failures can be checked with the intelligence base in accordance with the knowledges for the failures of the equipments and the extent of user's skill by way of the inference mechanism. (I.S.)

  6. Analysis of performance reliability of electrical and electronic equipment of car-tractor

    Directory of Open Access Journals (Sweden)

    Kravchenko О.Р.

    2016-08-01

    Full Text Available The analysis of the operational reliability of electrical and electronic equipment of vehicles, trucks Mercedes-Benz Actros 1844 LS and Volvo FH 1242, conducting international cargo transportation is performed. It is established that the equipment is reliable, which meets modern requirements, but where there is a violation of the resolution. The reason for repair work is constructive and operational factors. Distribution of efficiency and overall performance of operational reliability is retrieved. Items with more bounce are found. Common factors of violation of efficiency cars, trucks in operation, are largely different stages in warranty runs are obtained.

  7. Development of diagnosis and maintenance support system for nuclear power plants with flexible inference function and knowledge base edition support function

    International Nuclear Information System (INIS)

    Fujii, Makoto; Seki, Eiji; Tai, Ichiro; Morioka, Toshihiko

    1988-01-01

    For the reliable and efficient diagnosis and inspection work of the nuclear power plant equipments, 'Diagnosis and Maintenance Support System' has been developed. This system has functions to assist operators or engineers to observe and evaluate equipment conditions based on the experts' knowledge. These functions are carried out through dialogue between the system and users. This system has two subsystems: diagnosis subsystem and knowledge base edition support subsystem. To achieve the functions of diagnosis subsystem, a new method of knowledge processing for equipment diagnosis is adopted. This method is based on the concept of 'Cause Generation and Checking'. Knowledge for diagnosis is represented with modularized production rules. And each rule module consists of four different type rules with hierarchical structure. With this approach, the system is equipped with sufficient performance not only in diagnosis function but also in flexible man-machine interface. Knowledge base edition support subsystem (Graphical Rule Editor) is provided for this system. This editor has functions to display and edit the contents of knowledge base with tree structures through the graphic display. With these functions, the efficiency of constructing expert system is highly improved. By applying this system to the maintenance support of neutron monitoring system, it is proved that this system has satisfactory performance as a diagnosis and maintenance support system. (author)

  8. 40 CFR 63.2994 - How do I verify the performance of monitoring equipment?

    Science.gov (United States)

    2010-07-01

    ... equipment? (a) Before conducting the performance test, you must take the steps listed in paragraphs (a)(1) and (2) of this section: (1) Install and calibrate all process equipment, control devices, and... evaluation results. (b) If you use a thermal oxidizer, the temperature monitoring device must meet the...

  9. [Investigation report on the technical standards of TCM diagnosis, treatment and rehabilitation equipment].

    Science.gov (United States)

    Shen, Hua; Liu, Tangyi; Yang, Huayuan

    2016-02-01

    The questionnaire was adopted so as to investigate the attitudes and recognition of the manufacture eneprises of TCM diagnosis, treatment and rehabilitation equipment (DTRE) to the technical standards of, relevant products. It was found that the construction of the industrial standard and the national standard was lagged behind on TCM DTRE. Under the new situation, the enterprises are highly willing to participate in the development of the industrial, national and international standards and have a certain of understanding on the standard development. Nearly 80 % of enterprises believed that it was necessary to set up the relevant mirror organization for the development of industrial, national and international standard of TCM DITRE. In the future, the standard construction of TCM DTRE must face to the new situation. The constant increasing of the enterprises. and scientific research organizations in the standard construction must promote the development of TCM DTRE.

  10. The Relationship of Learning and Performance Diagnosis at Different System Levels.

    Science.gov (United States)

    Lubega, Khalid

    2003-01-01

    Examines learning and performance diagnosis, separately and in relation to each other, as they function in organization systems; explains the relationship between learning and performance diagnosis at the individual, process, and organizational levels using a three-level performance model; and discusses types of learning, including nonlearning,…

  11. Development of a Test Equipment for Performance Evaluation of Safety Systems

    International Nuclear Information System (INIS)

    Kim, S. J.; Kwon, S. M.; Lee, J. M.; Kim, C. K.; Cho, C. H.; Chun, J. H.; Park, M. K.

    2004-07-01

    The purpose of this study is to develop a test equipment for performance evaluation of safety systems in nuclear power plants. First, we develop an input-output simulator for reactor protection systems, ESF component control systems, and a data acquisition system for these I/O simulators as a hardware for this equipment. Then, we develop a software for human-machine interface system, which is easy-to-use and easy-to-modify. In addition, a simulation tool for a reactor trip switch gear is developed

  12. Performativity and the Politics of Equipping for Calculation

    DEFF Research Database (Denmark)

    Henriksen, Lasse Folke

    2013-01-01

    This article argues that the concept of performativity deepens our understanding of contemporary, expertise-driven processes of global economic governance. Tracing the World Bank's role in constructing a global market for microfinance, the paper suggests that the World Bank was instrumental...... in translating selected parts of economic models into practice, thereby changing microfinance practices globally. Socio-technical networks centered on the World Bank were created to equip actors to become part of a global market, which incorporated not only donors but also commercial investors. The paper makes...

  13. A method for performance assessment of medical radioisotope equipment

    International Nuclear Information System (INIS)

    Kerin, T.; Slavtchev, Ath.; Nedeltchev, M.; Kjurktchiev, T.

    1984-01-01

    A variety of tests and procedures exist for the performance assessment of radioisotope diagnostic equipment. The complex performance index which has been introduced to date is based on an heuristic approach. The present work tries to interconnect algorithmically the most important factors as the influence of the measurement geometry, the statistic peculiarities for lower activities and the information loss at high count rates. All this is reflected in a criterion which integrates the spatial resolution, the effective detector's field of vision, the radionuclide's sensitivity, the background count rate and the effective dead-time of the system under investigation. (Auth.)

  14. A Study on Performance and Safety Tests of Electrosurgical Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2016-09-01

    Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  15. Mapping of the radiation field of a mammography equipment using molybdenum and rhodium filters

    International Nuclear Information System (INIS)

    Barreira, Jacqueline S.; Campos, Daniela; Vivolo, Vitor

    2014-01-01

    The use of X rays for diagnostic radiology is very common and important to Medicine, including mammographic diagnosis focusing decreasing of the doses applied to the patients and preserving high quality of the diagnostic image. A quality control program of the irradiation systems it is very necessary. The Instruments Calibration Laboratory (LCI) of IPEN perform calibration in dosemeters used in radiation dosimetry (in diagnostic radiology) for many years. The objective of that paper is determining the point of greatest intensity of the beam issued by the mammography equipment. Exposures were made with filters Rhodium and Molybdenum. That mapping is important before applied a routine quality control program of the mammography equipment and the calibration of instruments in the diagnosis. (author)

  16. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  17. A survey in Portuguese X-ray fluoroscopy equipment: dose rates and image quality

    International Nuclear Information System (INIS)

    Teixeira, Nuno G.; Cunha, Gilda R.; Coutinho, Guilherme M.; Trindade, Hugo R.; Carvoeiras, Pedro P.

    2015-01-01

    X-ray fluoroscopy is essential in both diagnosis and medical intervention, although it may contribute to significant radiation doses to patients that have to be optimised and justified. Therefore, it is crucial to the patient to be exposed to the lowest achievable dose without compromising the image quality. The purpose of this study was to perform an analysis of the quality control measurements, particularly dose rates, contrast and spatial resolution of Portuguese fluoroscopy equipment and also to provide a contribution to the establishment of reference levels for the equipment performance parameters. Measurements carried out between 2007 and 2013 on 143 fluoroscopy equipment distributed by 34 nationwide health units were analysed. The measurements suggest that image quality and dose rates of Portuguese equipment are congruent with other studies, and in general, they are as per the Portuguese law. However, there is still a possibility of improvements intending optimisation at a national level. (authors)

  18. Development and performance of inspection equipment for pressure tubes in Fugen

    International Nuclear Information System (INIS)

    Naruo, Kazuteru; Tanimoto, Ken-ichi; Ohta, Takeo; Nakamura, Takahisa; Imaizumi, Kiyoshi.

    1984-01-01

    The pressure tubes of Fugen are the important equipment as the many tubes compose the core, and since they are made of Zr-2.5% Nb alloy which has been used for the first time in Japan, they have become the object of monitoring (the follow-up investigation of the change of inside diameter, the presence of defects and so on) in addition to the in-service inspection. In this paper, on the inspection equipment for pressure tubes, that has been developed independently by the Power Reactor and Nuclear Fuel Development Corp. in order to carry out the ISI and monitoring, the course of development and the construction and the performance are reported, and the results of having used it for the fourth regular inspection of Fugen are described. The 10-year plan of the ISI and monitoring of pressure tubes is shown. The core of Fugen is composed of 224 pressure tubes, therefore, the inspection is carried out by sampling inspection. The monitoring is carried out on four tubes for the follow-up investigation and one tube that shows the severest operation history at the time of inspection. The equipment performs ultrasonic flaw detection, the measurement of inside diameter and the visual inspection of internal surface. (Kako, I.)

  19. Facility/equipment performance evaluation using microcomputer simulation analysis

    International Nuclear Information System (INIS)

    Chockie, A.D.; Hostick, C.J.

    1985-08-01

    A computer simulation analysis model was developed at the Pacific Northwest Laboratory to assist in assuring the adequacy of the Monitored Retrievable Storage facility design to meet the specified spent nuclear fuel throughput requirements. The microcomputer-based model was applied to the analysis of material flow, equipment capability and facility layout. The simulation analysis evaluated uncertainties concerning both facility throughput requirements and process duration times as part of the development of a comprehensive estimate of facility performance. The evaluations provided feedback into the design review task to identify areas where design modifications should be considered

  20. Root cause analysis underscores the importance of understanding, addressing, and communicating cold chain equipment failures to improve equipment performance.

    Science.gov (United States)

    Lennon, Pat; Atuhaire, Brian; Yavari, Shahrzad; Sampath, Vidya; Mvundura, Mercy; Ramanathan, Nithya; Robertson, Joanie

    2017-04-19

    Vaccine cold chain equipment (CCE) in developing countries is often exposed to harsh environmental conditions, such as extreme temperatures and humidity, and is subject to many additional challenges, including intermittent power supply, insufficient maintenance capacity, and a scarcity of replacement parts. Together, these challenges lead to high failure rates for refrigerators, potentially damaging vaccines and adversely affecting immunization coverage. Providing a sustainable solution for improving CCE performance requires an understanding of the root causes of failure. Project teams conducted small-scale studies to determine the root causes of CCE failure in selected locations in Uganda and Mozambique. The evaluations covered 59 failed refrigerators and freezers in Uganda and 27 refrigerators in Mozambique. In Uganda, the vast majority of failures were due to a cooling unit fault in one widely used refrigerator model. In Mozambique, 11 of the 27 problems were attributable to solar refrigerators with batteries that were unable to hold a charge, and another eight problems were associated with a need to adjust thermostat settings. The studies showed that tracking and evaluation of equipment performance and failure can yield important, actionable information for a range of stakeholders, including local CCE technicians, the ministry of health, equipment manufacturers, and international partners such as the United Nations Children's Fund, World Health Organization, and Gavi, the Vaccine Alliance. Collaborative efforts to systematically collect and communicate data on CCE performance and causes of failure will help to improve the efficiency and reach of immunization programs in low- and middle-income countries. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  1. Experience on a BWR plant diagnosis system

    International Nuclear Information System (INIS)

    Tanabe, A.; Kawai, K.; Hashimoto, Y.

    1981-01-01

    It is important to watch plant dynamics and equipment condition for avoiding a big transient or avoiding damage to a system by equipment failure. After the TMI accident the necessity of a diagnosis system has been recognized and such development activities have become of primary importance in many organizations. A diagnosis system has two kinds of function. One is the early detection of an anomaly before detection by a conventional instrumentation system. The other is appropriate instruction after alarm or scram has occurred. The authors have been developing the former system by a noise analysis technique and a feasibility study has been undertaken in recent years as a joint research programme of several electric power companies and the Toshiba Corporation. A prototype diagnosis system has been installed on a BWR plant in Japan. This diagnosis system concerns reactor core, jet pumps and three main control systems. Many data from normal operation have been accumulated using this system and a variation pattern of normal noise data is clarified. On this basis, anomally detection criteria have been determined using statistical decision theory. It is confirmed that this system performance is satisfactory, and that the system will be of great use for surveillance of core and control systems without artificial disturbances. (author)

  2. Developing Software For Monitoring And Diagnosis

    Science.gov (United States)

    Edwards, S. J.; Caglayan, A. K.

    1993-01-01

    Expert-system software shell produces executable code. Report discusses beginning phase of research directed toward development of artificial intelligence for real-time monitoring of, and diagnosis of faults in, complicated systems of equipment. Motivated by need for onboard monitoring and diagnosis of electronic sensing and controlling systems of advanced aircraft. Also applicable to such equipment systems as refineries, factories, and powerplants.

  3. Intelligent System for Diagnosis of a Three-Phase Separator

    Directory of Open Access Journals (Sweden)

    Irina Ioniţă

    2016-03-01

    Full Text Available Intelligent systems for diagnosis have been used in a variety of domains: financial evaluation, credit scoring problem, identification of software and hardware problems of mechanical and electronic equipment, medical diagnosis, fault detection in gas-oil production plants etc. The goal of diagnosis systems is to classify the observed symptoms as being caused by some diagnosis class while advising systems perform such a classification and offer corrective remedies (recommendations. The current paper discuss the opportunity to combine more intelligent techniques and methodologies (intelligent agents, data mining and expert systems to increase the accuracy of results obtained from the diagnosis of a three-phase separator. The results indicate that the diagnosis hybrid system benefits from the advantages of each module component: intelligent agent module, data mining module and expert system module.

  4. Dental CBCT equipment and performance issues

    International Nuclear Information System (INIS)

    Horner, K.; Jacobs, R.; Schulze, R.

    2013-01-01

    Dental cone beam computed tomography (CBCT), also known as digital volumetric tomography was developed in the late 1990s and is now increasingly available in clinical practice. It can provide high resolution cross-sectional images of teeth and the maxillofacial region with applications in all branches of dentistry. As a new imaging modality, there were no established suspension levels at a European level. A literature review, encompassing scientific, professional publications and existing national guidelines was performed in an attempt to develop a set of suspension levels for dental CBCT, using additional expert opinion from the members of the European Academy of dento-maxillo-facial radiology. A limited set of suspension levels has been devised for aspects of the X-ray tube and generator, dosimetry, field-of-view, alignment and image quality. These should be kept under review in the light of growing experience of testing equipment in practice. (authors)

  5. EnergiTools. A methodology for performance monitoring and diagnosis

    International Nuclear Information System (INIS)

    Ancion, P.; Bastien, R.; Ringdahl, K.

    2000-01-01

    EnergiTools is a performance monitoring and diagnostic tool that combines the power of on-line process data acquisition with advanced diagnosis methodologies. Analytical models based on thermodynamic principles are combined with neural networks to validate sensor data and to estimate missing or faulty measurements. Advanced diagnostic technologies are then applied to point out potential faults and areas to be investigated further. The diagnosis methodologies are based on Bayesian belief networks. Expert knowledge is captured in the form of the fault-symptom relationships and includes historical information as the likelihood of faults and symptoms. The methodology produces the likelihood of component failure root causes using the expert knowledge base. EnergiTools is used at Ringhals nuclear power plants. It has led to the diagnosis of various performance issues. Three case studies based on this plant data and model are presented and illustrate the diagnosis support methodologies implemented in EnergiTools . In the first case, the analytical data qualification technique points out several faulty measurements. The application of a neural network for the estimation of the nuclear reactor power by interpreting several plant indicators is then illustrated. The use of the Bayesian belief networks is finally described. (author)

  6. A Study on Performance and Safety Tests of Electrosurgical Equipment

    Directory of Open Access Journals (Sweden)

    Tavakoli Golpaygani A.

    2016-09-01

    Full Text Available Introduction: Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient’s safety and management of the risks associated with the use of high and low frequency electrical currents on human body. Material and Methods: The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public was evaluated in one of the provinces of Iran according to international and national standards. Results: The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Conclusion: Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  7. Maintenance and test strategies to optimize NPP equipment performance

    International Nuclear Information System (INIS)

    Mayer, S.; Tomic, B.

    2000-01-01

    This paper proposes an approach to maintenance optimization of nuclear power plant components, which can help to increase both safety and availability. In order to evaluate the benefits of preventive maintenance on a quantitative basis, a software code has been developed for component performance and reliability simulation of safety related nuclear power plant equipment. A three state Markov model will be introduced, considering a degraded state in addition to an operational state and a failed state. (author)

  8. Research performed at the ET-RR-1 reactor using the neutron scattering equipment

    International Nuclear Information System (INIS)

    Adib, M.; Maayouf, R.M.A.; Abdel-Kawy, A.

    1990-02-01

    This report represents the results of studies and measurements, performed at the ET-RR-1 reactor, using the neutron scattering equipment supplied by the IAEA according to the technical assistance project EGY/1/11/10. The results of these studies, starting in 1980 and continuing to date, are discussed; the use of the equipment, both as a neutron monochromator and fixed scattering angle spectrometer, is also assessed. (author). 19 refs, 17 figs

  9. Diagnosis of Feedwater Heater Performance Degradation using Fuzzy Approach

    International Nuclear Information System (INIS)

    Kim, Hyeonmin; Kang, Yeon Kwan; Heo, Gyunyoung; Song, Seok Yoon

    2014-01-01

    It is inevitable to avoid degradation of component, which operates continuously for long time in harsh environment. Since this degradation causes economical loss and human loss, it is important to monitor and diagnose the degradation of component. The diagnosis requires a well-systematic method for timely decision. Before this article, the methods using regression model and diagnosis table have been proposed to perform the diagnosis study for thermal efficiency in Nuclear Power Plants (NPPs). Since the regression model was numerically less-stable under changes of operating variables, it was difficult to provide good results in operating plants. Contrary to this, the diagnosis table was hard to use due to ambiguous points and to detect how it affects degradation. In order to cover the issues of previous researches, we proposed fuzzy approaches and applied it to diagnose Feedwater Heater (FWH) degradation to check the feasibility. The degradation of FWHs is not easy to be observed, while trouble such as tube leakage may bring simultaneous damage to the tube bundle. This study explains the steps of diagnosing typical failure modes of FWHs. In order to cover the technical issues of previous researches, we adopted fuzzy logic to suggest a diagnosis algorithm for the degradation of FHWs and performed feasibility study. In this paper, total 7 modes of FWH degradation modes are considered, which are High Drain Level, Low Shell Pressure, Tube Pressure Increase, Tube Fouling, Pass Partition Plate Leakage, Tube Leakage, Abnormal venting. From the literature survey and simulation, diagnosis table for FWH is made. We apply fuzzy logic based on diagnosis table. Authors verify fuzzy diagnosis for FWH degradation synthesized the random input sets from made diagnosis table. Comparing previous researches, suggested method more-stable under changes of operating variables, than regression model. On the contrary, the problem which ambiguous points and detect how it affects degradation

  10. Diagnosis of Feedwater Heater Performance Degradation using Fuzzy Approach

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyeonmin; Kang, Yeon Kwan; Heo, Gyunyoung [Kyung Hee Univ., Yongin (Korea, Republic of); Song, Seok Yoon [Korea Hydro and Nuclear Power, Daejeon (Korea, Republic of)

    2014-05-15

    It is inevitable to avoid degradation of component, which operates continuously for long time in harsh environment. Since this degradation causes economical loss and human loss, it is important to monitor and diagnose the degradation of component. The diagnosis requires a well-systematic method for timely decision. Before this article, the methods using regression model and diagnosis table have been proposed to perform the diagnosis study for thermal efficiency in Nuclear Power Plants (NPPs). Since the regression model was numerically less-stable under changes of operating variables, it was difficult to provide good results in operating plants. Contrary to this, the diagnosis table was hard to use due to ambiguous points and to detect how it affects degradation. In order to cover the issues of previous researches, we proposed fuzzy approaches and applied it to diagnose Feedwater Heater (FWH) degradation to check the feasibility. The degradation of FWHs is not easy to be observed, while trouble such as tube leakage may bring simultaneous damage to the tube bundle. This study explains the steps of diagnosing typical failure modes of FWHs. In order to cover the technical issues of previous researches, we adopted fuzzy logic to suggest a diagnosis algorithm for the degradation of FHWs and performed feasibility study. In this paper, total 7 modes of FWH degradation modes are considered, which are High Drain Level, Low Shell Pressure, Tube Pressure Increase, Tube Fouling, Pass Partition Plate Leakage, Tube Leakage, Abnormal venting. From the literature survey and simulation, diagnosis table for FWH is made. We apply fuzzy logic based on diagnosis table. Authors verify fuzzy diagnosis for FWH degradation synthesized the random input sets from made diagnosis table. Comparing previous researches, suggested method more-stable under changes of operating variables, than regression model. On the contrary, the problem which ambiguous points and detect how it affects degradation

  11. PET diagnosis. The decisive factor for early detection of the cancer

    International Nuclear Information System (INIS)

    Yonekura, Yoshiharu; Kusakabe, Kiyoko; Fukuda, Hiroshi; Inoue, Kentaro; Tanaka, Koichi; Murayama, Hideo; Amano, Masaharu; Oikawa, Koichi; Yamashita, Takashi

    2007-01-01

    The feature contains 8 articles concerned with the subject matter in the title. The first is a document of the interview with Dr. Yoshiharu Yonekura, the National Institute of Radiological Sciences (NIRS) President, by the editor in chief of the journal, entitled ''Twenty to Thirty years are Necessary for Development of Basic Technology''- discussed are progress of molecular imaging, present and future of positron emission tomography (PET) diagnosis. Lasting are the articles of: ''Recommendation for PET diagnosis'' by K. Kusakabe, Tokyo Women's Medical Univ.- the role of PET diagnosis in a mass examination; ''The present state and future development of PET diagnosis of cancer'' by H. Fukuda and K. Inoue, Tohoku Univ. Hospital- labeled compounds and others; ''Promotion of popularization of the diagnosis as a part of CSR (corporate social responsibility) in the local medicare- A participation of the Hospital of Chugoku Electric Power Co., Ltd. in the project'' by K. Tanaka; ''Trend of development of next generation PET equipment'' by H. Murayama, NIRS- equipments like PET/CT or PET/MRI, and with high system sensitivity (detector- and photo-elements, DOI detection, high performance circuit, etc.); ''Achievement and developing trend of the equipments in the manufacturer- Shimadzu Corp.'' by M. Amano- PET/CT; ''(the same title)- Sumitomo Heavy Industries, Ltd.'' by K. Oikawa- cyclotron and therapeutic heavy ion beam generator; and ''Research and development in Hamamatsu Photonics K.K.'' by T. Yamashita- high throughput PET and animal PET. (R.T.)

  12. Fuzzy Logic Approach to Diagnosis of Feedwater Heater Performance Degradation

    International Nuclear Information System (INIS)

    Kang, Yeon Kwan; Kim, Hyeon Min; Heo, Gyun Young; Sang, Seok Yoon

    2014-01-01

    Since failure in, damage to, and performance degradation of power generation components in operation under harsh environment of high pressure and high temperature may cause both economic and human loss at power plants, highly reliable operation and control of these components are necessary. Therefore, a systematic method of diagnosing the condition of these components in its early stages is required. There have been many researches related to the diagnosis of these components, but our group developed an approach using a regression model and diagnosis table, specializing in diagnosis relating to thermal efficiency degradation of power plant. However, there was a difficulty in applying the method using the regression model to power plants with different operating conditions because the model was sensitive to value. In case of the method that uses diagnosis table, it was difficult to find the level at which each performance degradation factor had an effect on the components. Therefore, fuzzy logic was introduced in order to diagnose performance degradation using both qualitative and quantitative results obtained from the components' operation data. The model makes performance degradation assessment using various performance degradation variables according to the input rule constructed based on fuzzy logic. The purpose of the model is to help the operator diagnose performance degradation of components of power plants. This paper makes an analysis of power plant feedwater heater by using fuzzy logic. Feedwater heater is one of the core components that regulate life-cycle of a power plant. Performance degradation has a direct effect on power generation efficiency. It is not easy to observe performance degradation of feedwater heater. However, on the other hand, troubles such as tube leakage may bring simultaneous damage to the tube bundle and therefore it is the object of concern in economic aspect. This study explains the process of diagnosing and verifying typical

  13. Fuzzy Logic Approach to Diagnosis of Feedwater Heater Performance Degradation

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Yeon Kwan; Kim, Hyeon Min; Heo, Gyun Young [Kyung Hee University, Yongin (Korea, Republic of); Sang, Seok Yoon [Engineering and Technical Center, Korea Hydro, Daejeon (Korea, Republic of)

    2014-08-15

    Since failure in, damage to, and performance degradation of power generation components in operation under harsh environment of high pressure and high temperature may cause both economic and human loss at power plants, highly reliable operation and control of these components are necessary. Therefore, a systematic method of diagnosing the condition of these components in its early stages is required. There have been many researches related to the diagnosis of these components, but our group developed an approach using a regression model and diagnosis table, specializing in diagnosis relating to thermal efficiency degradation of power plant. However, there was a difficulty in applying the method using the regression model to power plants with different operating conditions because the model was sensitive to value. In case of the method that uses diagnosis table, it was difficult to find the level at which each performance degradation factor had an effect on the components. Therefore, fuzzy logic was introduced in order to diagnose performance degradation using both qualitative and quantitative results obtained from the components' operation data. The model makes performance degradation assessment using various performance degradation variables according to the input rule constructed based on fuzzy logic. The purpose of the model is to help the operator diagnose performance degradation of components of power plants. This paper makes an analysis of power plant feedwater heater by using fuzzy logic. Feedwater heater is one of the core components that regulate life-cycle of a power plant. Performance degradation has a direct effect on power generation efficiency. It is not easy to observe performance degradation of feedwater heater. However, on the other hand, troubles such as tube leakage may bring simultaneous damage to the tube bundle and therefore it is the object of concern in economic aspect. This study explains the process of diagnosing and verifying typical

  14. Fault Diagnosis Method for a Mine Hoist in the Internet of Things Environment.

    Science.gov (United States)

    Li, Juanli; Xie, Jiacheng; Yang, Zhaojian; Li, Junjie

    2018-06-13

    To reduce the difficulty of acquiring and transmitting data in mining hoist fault diagnosis systems and to mitigate the low efficiency and unreasonable reasoning process problems, a fault diagnosis method for mine hoisting equipment based on the Internet of Things (IoT) is proposed in this study. The IoT requires three basic architectural layers: a perception layer, network layer, and application layer. In the perception layer, we designed a collaborative acquisition system based on the ZigBee short distance wireless communication technology for key components of the mine hoisting equipment. Real-time data acquisition was achieved, and a network layer was created by using long-distance wireless General Packet Radio Service (GPRS) transmission. The transmission and reception platforms for remote data transmission were able to transmit data in real time. A fault diagnosis reasoning method is proposed based on the improved Dezert-Smarandache Theory (DSmT) evidence theory, and fault diagnosis reasoning is performed. Based on interactive technology, a humanized and visualized fault diagnosis platform is created in the application layer. The method is then verified. A fault diagnosis test of the mine hoisting mechanism shows that the proposed diagnosis method obtains complete diagnostic data, and the diagnosis results have high accuracy and reliability.

  15. Performance of on-site Medical waste disinfection equipment in hospitals of Tabriz, Iran

    Directory of Open Access Journals (Sweden)

    Hassan Taghipour

    2016-10-01

    Full Text Available Background: The number of studies available on the performance of on-site medical waste treatment facilities is rare, to date. The aim of this study was to evaluate the performance of onsite medical waste treatment equipment in hospitals of Tabriz, Iran. Methods: A various range of the on-site medical waste disinfection equipment (autoclave, chemical disinfection, hydroclave, and dry thermal treatment was considered to select 10 out of 22 hospitals in Tabriz to be included in the survey. The apparatus were monitored mechanically, chemically, and biologically for a six months period in all of the selected hospitals. Results: The results of the chemical monitoring (Bowie-Dick tests indicated that 38.9% of the inspected autoclaves had operational problems in pre-vacuum, air leaks, inadequate steam penetration into the waste, and/or vacuum pump. The biological indicators revealed that about 55.55% of the samples were positive. The most of applied devices were not suitable for treating anatomical, pharmaceutical, cytotoxic, and chemical waste. Conclusion: Although on-site medical waste treating facilities have been installed in all the hospitals, the most of infectious-hazardous medical waste generated in the hospitals were deposited into a municipal solid waste landfill, without enough disinfection. The responsible authorities should stringently inspect and evaluate the operation of on-site medical waste treating equipment. An advanced off-site central facility with multi-treatment and disinfection equipment and enough capacity is recommended as an alternative.

  16. Diagnosis and dynamics of low energy electron beams using DIADYN

    International Nuclear Information System (INIS)

    Marghitu, S.; Oproiu, C.; Toader, D.; Ruset, C.; Grigore, E.; Marghitu, O.; Vasiliu, M.

    2008-01-01

    The paper presents original results concerning electron beam diagnosis and dynamics using DIADYN, a low energy (10 - 50 kV), medium intensity (0.1 - 1 A) laboratory equipment. A key stage in the operation of DIADYN is the beam diagnosis, performed by the non-destructive, modified three-gradient method (MTGM). We concentrate on the better use of experimental and computational techniques, in order to improve the consistency of the results. At present, DIADYN is equipped with a hot filament vacuum electron source (VES), consisting of a convergent Pierce diode, working in a pulse mode. Since the plasma electron sources (PES) have a longer lifetime and produce higher beam currents, we discuss the possibility to replace the VES with a PES. Special attention is given to VES results in a functioning regime typical for a low energy glow discharge PES. (authors)

  17. Diagnosis and dynamics of low energy electron beams using DIADYN

    Energy Technology Data Exchange (ETDEWEB)

    Marghitu, S [Electrostatica, ICPE-CA S.A., Spaiul Unirii 313, Sector 3, RO-74204 Bucharest (Romania); Oproiu, C; Toader, D; Ruset, C; Grigore, E [National Institute for Laser, Plasma and Radiation Physics, PO Box MG-36, 409 Atomistilor Street, RO-76900 Bucharest-Magurele (Romania); Marghitu, O [Institute for Space Sciences, INCDLPFR, PO Box MG-23, RO-76911 Bucharest-Magurele (Romania); Vasiliu, M [Politehnica University, 313 Splaiul Independentei, RO-060032, Bucharest (Romania)

    2008-07-01

    The paper presents original results concerning electron beam diagnosis and dynamics using DIADYN, a low energy (10 - 50 kV), medium intensity (0.1 - 1 A) laboratory equipment. A key stage in the operation of DIADYN is the beam diagnosis, performed by the non-destructive, modified three-gradient method (MTGM). We concentrate on the better use of experimental and computational techniques, in order to improve the consistency of the results. At present, DIADYN is equipped with a hot filament vacuum electron source (VES), consisting of a convergent Pierce diode, working in a pulse mode. Since the plasma electron sources (PES) have a longer lifetime and produce higher beam currents, we discuss the possibility to replace the VES with a PES. Special attention is given to VES results in a functioning regime typical for a low energy glow discharge PES. (authors)

  18. Performance Indexing: Assessing the Nonmonetized Returns on Investment in Military Equipment

    Science.gov (United States)

    2016-05-17

    Image designed by Diane Fleischer PERFORMANCE INDEXING: Assessing the NONMONETIZED RETURNS ON INVESTMENT in Military Equipment Ian D...MacLeod and Capt Robert A. Dinwoodie, USMC A prime managerial concern is how to decide which investment alternatives provide the greatest return with...agencies, these methods often fall short because typical governmental investments do not have a monetary return. The processes underpinning governmental

  19. Color Segmentation Approach of Infrared Thermography Camera Image for Automatic Fault Diagnosis

    International Nuclear Information System (INIS)

    Djoko Hari Nugroho; Ari Satmoko; Budhi Cynthia Dewi

    2007-01-01

    Predictive maintenance based on fault diagnosis becomes very important in current days to assure the availability and reliability of a system. The main purpose of this research is to configure a computer software for automatic fault diagnosis based on image model acquired from infrared thermography camera using color segmentation approach. This technique detects hot spots in equipment of the plants. Image acquired from camera is first converted to RGB (Red, Green, Blue) image model and then converted to CMYK (Cyan, Magenta, Yellow, Key for Black) image model. Assume that the yellow color in the image represented the hot spot in the equipment, the CMYK image model is then diagnosed using color segmentation model to estimate the fault. The software is configured utilizing Borland Delphi 7.0 computer programming language. The performance is then tested for 10 input infrared thermography images. The experimental result shows that the software capable to detect the faulty automatically with performance value of 80 % from 10 sheets of image input. (author)

  20. The research of medical equipment on-line detection system based on Android smartphone

    Science.gov (United States)

    Jiang, Junjie; Dong, Xinyu; Zhang, Hongjie; Liu, Mengjun

    2017-06-01

    With the unceasing enhancement of medical level, the expanding scale of medical institutions, medical equipment as an important tool for disease diagnosis, treatment and prevention, used in all levels of medical institutions. The quality and accuracy of the Medical equipment play a key role in the doctor's diagnosis and treatment effect, medical metrology as the important technical foundation is to ensure that the equipment, technology, material components are accurate and the application is safe and reliable. Medical equipment have the feature of variety, large quantity, long using cycle, expensive and multi-site, which bring great difficulty in maintenance, equipment management and verification. Therefore, how to get the medical measurement integrate deeply into the advanced internet technology, information technology and the new measuring method, for real-time monitoring of medical equipment, tracking, positioning, and query is particularly important.

  1. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  2. Performance Estimation and Fault Diagnosis Based on Levenberg–Marquardt Algorithm for a Turbofan Engine

    Directory of Open Access Journals (Sweden)

    Junjie Lu

    2018-01-01

    Full Text Available Establishing the schemes of accurate and computationally efficient performance estimation and fault diagnosis for turbofan engines has become a new research focus and challenges. It is able to increase reliability and stability of turbofan engine and reduce the life cycle costs. Accurate estimation of turbofan engine performance counts on thoroughly understanding the components’ performance, which is described by component characteristic maps and the fault of each component can be regarded as the change of characteristic maps. In this paper, a novel method based on a Levenberg–Marquardt (LM algorithm is proposed to enhance the fidelity of the performance estimation and the credibility of the fault diagnosis for the turbofan engine. The presented method utilizes the LM algorithm to figure out the operating point in the characteristic maps, preparing for performance estimation and fault diagnosis. The accuracy of the proposed method is evaluated for estimating performance parameters in the transient case with Rayleigh process noise and Gaussian measurement noise. The comparison among the extended Kalman filter (EKF method, the particle filter (PF method and the proposed method is implemented in the abrupt fault case and the gradual degeneration case and it has been shown that the proposed method has the capability to lead to more accurate result for performance estimation and fault diagnosis of turbofan engine than current popular EKF and PF diagnosis methods.

  3. AIChe equipment testing procedure centrifugal compressors : a guide to performance evaluation and site testing

    CERN Document Server

    AIChE

    2013-01-01

    With its engineer-tested procedures and thorough explanations, Centrifugal Compressors is an essential text for anyone engaged in implementing new technology in equipment design, identifying process problems, and optimizing equipment performance.  This condensed book presents a step by step approach to preparing for, planning, executing, and analyzing tests of centrifugal compressors, with an emphasis on methods that can be conducted on-site and with an acknowledgement of the strengths and limitations of these methods. The book opens with an extensive and detailed section offering definitions

  4. High-throughput determination of urinary hexosamines for diagnosis of mucopolysaccharidoses by capillary electrophoresis and high-performance liquid chromatography.

    Science.gov (United States)

    Coppa, Giovanni V; Galeotti, Fabio; Zampini, Lucia; Maccari, Francesca; Galeazzi, Tiziana; Padelia, Lucia; Santoro, Lucia; Gabrielli, Orazio; Volpi, Nicola

    2011-04-01

    Mucopolysaccharidoses (MPS) diagnosis is often delayed and irreversible organ damage can occur, making possible therapies less effective. This highlights the importance of early and accurate diagnosis. A high-throughput procedure for the simultaneous determination of glucosamine and galactosamine produced from urinary galactosaminoglycans and glucosaminoglycans by capillary electrophoresis (CE) and HPLC has been performed and validated in subjects affected by various MPS including their mild and severe forms, Hurler and Hurler-Scheie, Hunter, Sanfilippo, Morquio, and Maroteaux-Lamy. Contrary to other analytical approaches, the present single analytical procedure, which is able to measure total abnormal amounts of urinary GAGs, high molecular mass, and related fragments, as well as specific hexosamines belonging to a group of GAGs, would be useful for possible application in their early diagnosis. After a rapid urine pretreatment, free hexosamines are generated by acidic hydrolysis, derivatized with 2-aminobenzoic acid and separated by CE/UV in ∼10min and reverse-phase (RP)-HPLC in fluorescence in ∼21min. The total content of hexosamines was found to be indicative of abnormal urinary excretion of GAGs in patients compared to the controls, and the galactosamine/glucosamine ratio was observed to be related to specific MPS syndromes in regard to both their mild and severe forms. As a consequence, important correlations between analytical response and clinical diagnosis and the severity of the disorders were observed. Furthermore, we can assume that the severity of the syndrome may be ascribed to the quantity of total GAGs, as high-molecular-mass polymers and fragments, accumulated in cells and directly excreted in the urine. Finally, due to the high-throughput nature of this approach and to the equipment commonly available in laboratories, this method is suitable for newborn screening in preventive public health programs for early detection of MPS disorders

  5. Performance test of nutrient control equipment for hydroponic plants

    Science.gov (United States)

    Rahman, Nurhaidar; Kuala, S. I.; Tribowo, R. I.; Anggara, C. E. W.; Susanti, N. D.

    2017-11-01

    Automatic control equipment has been made for the nutrient content in irrigation water for hydroponic plants. Automatic control equipment with CCT53200E conductivity controller to nutrient content in irrigation water for hydroponic plants, can be used to control the amount of TDS of nutrient solution in the range of TDS numbers that can be set according to the range of TDS requirements for the growth of hydroponically cultivated crops. This equipment can minimize the work time of hydroponic crop cultivators. The equipment measurement range is set between 1260 ppm up to 1610 ppm for spinach plants. Caisim plants were included in this experiment along with spinach plants with a spinach plants TDS range. The average of TDS device is 1450 ppm, while manual (conventional) is 1610 ppm. Nutrient solution in TDS controller has pH 5,5 and temperature 29,2 °C, while manual is pH 5,6 and temperature 31,3 °C. Manually treatment to hydroponic plant crop, yields in an average of 39.6 grams/plant, greater than the yield of spinach plants with TDS control equipment, which is in an average of 24.6 grams / plant. The yield of caisim plants by manual treatment is in an average of 32.3 grams/crop, less than caisim crop yields with TDS control equipment, which is in an average of 49.4 grams/plant.

  6. [Equipping the bacteriological laboratories of a tuberculosis service as the most important element of assurance of the quality and safety of their work].

    Science.gov (United States)

    Sevast'ianova, E V; Martynova, L P; Barilo, V N; Golyshevskaia, V I; Shul'gina, M V

    2009-01-01

    By taking into account the present requirements for the equipping of the laboratories, the authors have drawn up the minimum standard list of equipment, as well as a list of additional equipment for the specialized bacteriological laboratory of a tuberculosis-controlling institution, which performs microbiological studies for the diagnosis and control of chemotherapy for tuberculosis. The specifications and characteristics of the baric types of equipment used to fit out the laboratories under the present conditions are described. Equipping the laboratories in accordance with the draw-up lists is shown to ensure a qualitative, effective, and safe work. Recommendations on how to supply the laboratories with equipment, to make the optimal choice, and to use consumables for tests are given.

  7. Equipment performance monitoring in NPP Krsko (Summarized system health report)

    International Nuclear Information System (INIS)

    Djetelic, N.; Cicvaric, D.

    2004-01-01

    Management common goal is safe, reliable, effective, acceptable to public and conservative/cautious operation of NPP Krsko. A set of programs, including Corrective Action Program, Performance Indicators, Operating Experience, Self Assessment and System Health Report, is developed to assist NPP Krsko management in fulfilling those goals. System Health Report is a tool that management can use to quickly assess how selected systems are performing, to determine where additional management attention is required and to determine if appropriate corrective actions have been established. Summarized System Health Report is developed for management's quick overview of systems status, important system malfunctions and problems as well as major changes from previous assessment period. Summarized Report contains nine sections: status difference including brief explanation, selected performance indicators, new equipment problems, functional failures, important problem analyses, action plan for systems with Potential Danger (RED) status, maintenance rule status overview and systems availability (planned and unplanned).(author)

  8. Diagnosis - Using automatic test equipment and artificial intelligence expert systems

    Science.gov (United States)

    Ramsey, J. E., Jr.

    Three expert systems (ATEOPS, ATEFEXPERS, and ATEFATLAS), which were created to direct automatic test equipment (ATE), are reviewed. The purpose of the project was to develop an expert system to troubleshoot the converter-programmer power supply card for the F-15 aircraft and have that expert system direct the automatic test equipment. Each expert system uses a different knowledge base or inference engine, basing the testing on the circuit schematic, test requirements document, or ATLAS code. Implementing generalized modules allows the expert systems to be used for any different unit under test. Using converted ATLAS to LISP code allows the expert system to direct any ATE using ATLAS. The constraint propagated frame system allows for the expansion of control by creating the ATLAS code, checking the code for good software engineering techniques, directing the ATE, and changing the test sequence as needed (planning).

  9. Performance of the standard FAIR equipment controller prototype

    International Nuclear Information System (INIS)

    Rauch, S.; Baer, R.C.; Panschow, W.; Thieme, M.

    2012-01-01

    For the control system of the new FAIR accelerator facility a standard equipment controller, the Scalable Control Unit (SCU), is presently under development. First prototypes have already been tested in real applications. The controller combines an *86 COM Express TM Board and an Altera Arria TM II FPGA. Over a parallel bus interface called the SCU bus, up to 12 slave boards can be controlled. Communication between CPU and FPGA is done by a PCIe link. We discuss the real time behaviour between the Linux OS and the FPGA Hardware. For the test, a Front-End Software Architecture (FESA) class, running under Linux, communicates with the PCIe bridge in the FPGA. Although we are using PCIe only for single 32 bit wide accesses to the FPGA address space, the performance still seems sufficient. The tests showed an average response time to IRQs of 50 μs with a 1.6 GHz Intel Atom CPU. This includes the context change to the FESA user space application and the reply back to the FPGA. Further topics are the bandwidth of the PCIe link for single/burst transfers and the performance of the SCU bus communication. (authors)

  10. Performance management in the internal supply chain of an industry of equipment for refrigeration

    Directory of Open Access Journals (Sweden)

    Emílio Della Bruna Junior

    2013-05-01

    Full Text Available Supply chains are complex, conflicting and uncertain management environments, where the best alternatives are usually not previously know, they need to be built based on the managers objectives. For this reason, its decision-makers have been looking for management tools that expand their understanding in order to identify which objectives best represent their values regarding the decision context. With this in mind, this paper aims to develop a Performance Evaluation Model for the operations of the internal supply chain of an organization of the refrigeration equipment sector. The study adopts a mixture of qualitative and quantitative approaches and applies them through a case study. The data collection was conducted through unstructured interviews with the decision-maker as well as specialists appointed by him and supplemented by documentary research. The applied intervention instrument is the Multricriteria Decision Aid – Constructivist (MCDA-C due to its capacity of expanding the knowledge in the decision-maker about the consequences of his decisions on the criteria that he deems critical to the success of the company. One of the results of this research was the identification of the objectives that, according to the decision-maker perception, should drive the alternative definition process, as well as their organization, ordinal and cardinal measurement and integration. In addition, it can be highlighted the current situation diagnosis and elaboration of improvement actions, where the implementation effects of the Lean Philosophy and an Advanced Planning System are evaluated. The main contributions made by the article resides in the proposal of solutions for fulfilling gaps identified within the Supply Chain Performance Evaluation area and in the application of the MCDA-C to a real case.

  11. A Study on Performance and Safety Tests of Defibrillator Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2017-12-01

    Nowadays, more than 10,000 different types of medical devices can be found in hospitals. This way, medical electrical equipment is being employed in a wide variety of fields in medical sciences with different physiological effects and measurements. Hospitals and medical centers must ensure that their critical medical devices are safe, accurate, reliable and operational at the required level of performance. Defibrillators are critical resuscitation devices. The use of reliable defibirillators has led to more effective treatments and improved patient safety through better control and management of complications during Cardiopulmonary Resuscitation (CPR). The metrological reliability of twenty frequent use, manual defibrillators in use ten hospitals (4 private and 6 public) in one of the provinces of Iran according to international and national standards was evaluated. Quantitative analysis of control and instrument accuracy showed the amount of the obtained results in many units are critical which had less value over the standard limitations especially in devices with poor battery. For the accuracy of delivered energy analysis, only twelve units delivered acceptable output values and the precision in the output energy measurements especialy in weak battry condition, after activation of discharge alarm, were low. Obtained results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially for high risk instruments. It is also necessary to provide training courses on the fundumentals of operation and performane parameters for medical staff in the field of meterology in medicine and how one can get good accuracy results especially in high risk medical devices.

  12. Building and application of the performance diagnosis system for nuclear power plants

    International Nuclear Information System (INIS)

    Ono, S.; Kanbara, K.; Sugawara, Y.

    2010-01-01

    To achieve a low-carbon society, we promote utilization of nuclear energy, which plays a zero-emission power generation. Therefore the nuclear power plants have been imposed a stable supply of electricity. The condition based maintenance (CBM) is effective in order to maintain a stable operation of the nuclear power plants. We built the performance diagnosis system based on the heat and mass balance calculation as one of supporting tools for the CBM. Moreover we note that the performance diagnosis system is built for steam turbine cycle operating with saturated steam conditions. (author)

  13. Fault diagnosis methods for district heating substations

    Energy Technology Data Exchange (ETDEWEB)

    Pakanen, J.; Hyvaerinen, J.; Kuismin, J.; Ahonen, M. [VTT Building Technology, Espoo (Finland). Building Physics, Building Services and Fire Technology

    1996-12-31

    A district heating substation is a demanding process for fault diagnosis. The process is nonlinear, load conditions of the district heating network change unpredictably and standard instrumentation is designed only for control and local monitoring purposes, not for automated diagnosis. Extra instrumentation means additional cost, which is usually not acceptable to consumers. That is why all conventional methods are not applicable in this environment. The paper presents five different approaches to fault diagnosis. While developing the methods, various kinds of pragmatic aspects and robustness had to be considered in order to achieve practical solutions. The presented methods are: classification of faults using performance indexing, static and physical modelling of process equipment, energy balance of the process, interactive fault tree reasoning and statistical tests. The methods are applied to a control valve, a heat excharger, a mud separating device and the whole process. The developed methods are verified in practice using simulation, simulation or field tests. (orig.) (25 refs.)

  14. Performance test of ex-core high temperature and high pressure water loop test equipment (Contract research)

    International Nuclear Information System (INIS)

    Nakano, Hiroko; Uehara, Toshiaki; Takeuchi, Tomoaki; Shibata, Hiroshi; Nakamura, Jinichi; Matsui, Yoshinori; Tsuchiya, Kunihiko

    2016-03-01

    In Japan Atomic Energy Agency, we started research and development so as to monitor the situations in the Nuclear Plant Facilities during a severe accident, such as a radiation-resistant monitoring camera, a radiation-resistant transmission system for conveying the in-core information, and a heat-resistant signal cable. As a part of developments of the heat-resistant signal cable, we prepared ex-core high-temperature and high-pressure water loop test equipment, which can simulate the conditions of BWRs and PWRs, for evaluating reliability and properties of sheath materials of the cable. This equipment consists of autoclave, water conditioning tank, high-pressure metering pump, preheater, heat exchanger and water purification equipment, etc. This report describes the basic design and the performance test results of ex-core high-temperature and high-pressure water loop test equipment. (author)

  15. Effects of integrated designs of alarm and process information on diagnosis performance in digital nuclear power plants.

    Science.gov (United States)

    Wu, Xiaojun; She, Manrong; Li, Zhizhong; Song, Fei; Sang, Wei

    2017-12-01

    In the main control rooms of nuclear power plants (NPPs), operators frequently switch between alarm displays and system-information displays to incorporate information from different screens. In this study, we investigated two integrated designs of alarm and process information - integrating alarm information into process displays (denoted as Alarm2Process integration) and integrating process information into alarm displays (denoted as Process2Alarm integration). To analyse the effects of the two integration approaches and time pressure on the diagnosis performance, a laboratory experiment was conducted with ninety-six students. The results show that compared with the non-integrated case, Process2Alarm integration yields better diagnosis performance in terms of diagnosis accuracy, time required to generate correct hypothesis and completion time. In contrast, the Alarm2Process integration leads to higher levels of workload, with no improvement in diagnosis performance. The diagnosis performance of Process2Alarm integration was consistently better than that of Alarm2Process integration, regardless of the levels of time pressure. Practitioner Summary: To facilitate operator's synthesis of NPP information when performing diagnosis tasks, we proposed to integrate process information into alarm displays. The laboratory validation shows that the integration approach significantly improves the diagnosis performance for both low and high time-pressure levels.

  16. A Study on Performance and Safety Tests of Defibrillator Equipment

    Directory of Open Access Journals (Sweden)

    Tavakoli Golpaygani A.

    2017-12-01

    Full Text Available Introduction: Nowadays, more than 10,000 different types of medical devices can be found in hospitals. This way, medical electrical equipment is being employed in a wide variety of fields in medical sciences with different physiological effects and measurements. Hospitals and medical centers must ensure that their critical medical devices are safe, accurate, reliable and operational at the required level of performance. Defibrillators are critical resuscitation devices. The use of reliable defibirillators has led to more effective treatments and improved patient safety through better control and management of complications during Cardiopulmonary Resuscitation (CPR. Materials and Methods: The metrological reliability of twenty frequent use, manual defibrillators in use ten hospitals (4 private and 6 public in one of the provinces of Iran according to international and national standards was evaluated. Results: Quantitative analysis of control and instrument accuracy showed the amount of the obtained results in many units are critical which had less value over the standard limitations especially in devices with poor battery. For the accuracy of delivered energy analysis, only twelve units delivered acceptable output values and the precision in the output energy measurements especialy in weak battry condition, after activation of discharge alarm, were low. Conclusion: Obtained results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially for high risk instruments. It is also necessary to provide training courses on the fundumentals of operation and performane parameters for medical staff in the field of meterology in medicine and how one can get good accuracy results especially in high risk medical devices.

  17. The degradation diagnosis of low voltage cables used at nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Toshio; Ashida, Tetsuya; Ikeda, Takeshi; Yasuhara, Takeshi; Takechi, Kei; Araki, Shogo

    2001-01-01

    Low voltage cables which have been used for the supply of electric power and the propagation of control signals in nuclear power plants must be sound for safe and stable operation. The long use of nuclear power plants has been reviewed, and the degradation diagnosis to estimate the soundness of low voltage cables has been emphasized. Mitsubishi Cable Industries has established a degradation diagnosis method of cables which convert the velocity of ultrasonic wave in the surface layer of the cable insulation or jacket into breaking elongation, and has developed a degradation diagnosis equipment of low voltage cables used at nuclear power plants in cooperation with Mitsubishi Heavy Industries. This equipment can be moved by an ultrasonic probe by sequential control and measure the ultrasonic velocity automatically. It is capable of a fast an sensitive diagnosis of the cables. We report the outline of this degradation diagnosis equipment and an example of the adaptability estimation at an actual nuclear power plant. (author)

  18. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  19. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  20. Approach to the assessment of the performance of nondestructive test methods in the manufacture of nuclear power station equipment

    International Nuclear Information System (INIS)

    Michaut, J.P.

    1996-01-01

    The safety of a nuclear power station lies largely in the possibility of ensuring, at the time of in service inspections on major equipment, that the extent of faults which may appear or develop is not greater than that of faults detrimental to behavior in service. This assurance is based on performance demonstration of the nondestructive test methods used for inspecting the equipment in service. This is the subject of numerous studies in various countries. To ensure that manufacturing faults likely to downgrade the safety of the equipment are not discovered in service, it seems desirable to make sure that the performance of the nondestructive test (NDT) methods which are going to be used in manufacture will be at least as high as those used in service and that they are therefore capable of guaranteeing detection of faults clearly less important than really harmful faults. The performance of NDT methods and their consistency with those which can be used in service is evaluated before the start of manufacture on a mock-up representative of the equipment itself. Information is given on research in progress on the bimetal welding of a pressurizer spray nozzle

  1. THE RELEVANCE OF THE PERFORMANCE INDICATORS IN ECONOMIC AND FINANCIAL DIAGNOSIS

    Directory of Open Access Journals (Sweden)

    MIRELA MONEA

    2011-01-01

    Full Text Available Each company must achieve the objectives to reach performance in order to survive on the market. The paper aims to present the concept of performance as is seen in economic literature, to discuss the relevance of the main performances indicators on economic and financial diagnosis, to answer the question what are the main indicators which reflect economic or financial performances: profit, profitability ratios, economic added value, investments return, liquidity, cash-flows, resources efficiency, productivity, others.

  2. Concrete pedestals for high-performance semiconductor production equipment

    Science.gov (United States)

    Vogen, Wayne; Franklin, Craig L.; Morneault, Joseph

    1999-09-01

    Concrete pedestals have many vibration and stiffness characteristics that make them a superior choice for sensitive semiconductor production equipment including scanners, scanning electron microscopes, focused ion beam millers and optical inspection equipment. Among the advantages of concrete pedestals are high inherent damping, monolithic construction that eliminates low stiffness joints common in steep pedestals, ability to reuse and ease of installation. Steel pedestals that have plates attached to the top of the frame are easily excited by acoustic excitation, especially in the range from 50 Hertz to 400 Hertz. Concrete pedestals do not suffer from this phenomenon because of the high mass and damping of the top surface.

  3. Training Corrective Maintenance Performance on Electronic Equipment with CAI Terminals: I. A Feasibility Study.

    Science.gov (United States)

    Rigney, Joseph W.

    A report is given of a feasibility study in which several possible relationships between student, computer terminal, and electronic equipment were considered. The simplest of these configurations was set up and examined in terms of its feasibility for teaching the performance of fault localization on a Navy transceiver. An instructional program…

  4. Radiological diagnosis of stomach cancer

    Energy Technology Data Exchange (ETDEWEB)

    Horlacher, B

    1981-05-01

    The problems of routine radiology and the differential diagnosis of malignant and benign gastric ulcers are gone into. The value of endoscopy combined with radiology is stressed. The patient, the physician, and the X-ray equipment have to meet certain requirements in order to obtain good images and make a correct interpretation. The most important aspect of radiology today is radiation protection, which is possible only with efficient equipment and experienced medical examiners.

  5. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  6. Visual search performance in infants associates with later ASD diagnosis

    Directory of Open Access Journals (Sweden)

    C.H.M. Cheung

    2018-01-01

    Full Text Available An enhanced ability to detect visual targets amongst distractors, known as visual search (VS, has often been documented in Autism Spectrum Disorders (ASD. Yet, it is unclear when this behaviour emerges in development and if it is specific to ASD. We followed up infants at high and low familial risk for ASD to investigate how early VS abilities links to later ASD diagnosis, the potential underlying mechanisms of this association and the specificity of superior VS to ASD. Clinical diagnosis of ASD as well as dimensional measures of ASD, attention-deficit/hyperactivity disorder (ADHD and anxiety symptoms were ascertained at 3 years. At 9 and 15 months, but not at age 2 years, high-risk children who later met clinical criteria for ASD (HR-ASD had better VS performance than those without later diagnosis and low-risk controls. Although HR-ASD children were also more attentive to the task at 9 months, this did not explain search performance. Superior VS specifically predicted 3 year-old ASD but not ADHD or anxiety symptoms. Our results demonstrate that atypical perception and core ASD symptoms of social interaction and communication are closely and selectively associated during early development, and suggest causal links between perceptual and social features of ASD. Keywords: Visual search, Visual attention, ASD, ADHD, Infant, Familial risk

  7. Visual search performance in infants associates with later ASD diagnosis.

    Science.gov (United States)

    Cheung, C H M; Bedford, R; Johnson, M H; Charman, T; Gliga, T

    2018-01-01

    An enhanced ability to detect visual targets amongst distractors, known as visual search (VS), has often been documented in Autism Spectrum Disorders (ASD). Yet, it is unclear when this behaviour emerges in development and if it is specific to ASD. We followed up infants at high and low familial risk for ASD to investigate how early VS abilities links to later ASD diagnosis, the potential underlying mechanisms of this association and the specificity of superior VS to ASD. Clinical diagnosis of ASD as well as dimensional measures of ASD, attention-deficit/hyperactivity disorder (ADHD) and anxiety symptoms were ascertained at 3 years. At 9 and 15 months, but not at age 2 years, high-risk children who later met clinical criteria for ASD (HR-ASD) had better VS performance than those without later diagnosis and low-risk controls. Although HR-ASD children were also more attentive to the task at 9 months, this did not explain search performance. Superior VS specifically predicted 3 year-old ASD but not ADHD or anxiety symptoms. Our results demonstrate that atypical perception and core ASD symptoms of social interaction and communication are closely and selectively associated during early development, and suggest causal links between perceptual and social features of ASD. Crown Copyright © 2016. Published by Elsevier Ltd. All rights reserved.

  8. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  9. 75 FR 76254 - Official Performance and Procedural Requirements for Grain Weighing Equipment and Related Grain...

    Science.gov (United States)

    2010-12-08

    ... DEPARTMENT OF AGRICULTURE Grain Inspection, Packers and Stockyards Administration 7 CFR Part 802 [Docket GIPSA-2010-FGIS-0012] RIN 0580-AB19 Official Performance and Procedural Requirements for Grain Weighing Equipment and Related Grain Handling Systems AGENCY: Grain Inspection, Packers and Stockyards...

  10. Application and issues of online maintenance for equipment of nuclear power plants

    International Nuclear Information System (INIS)

    Higasa, Hisakazu

    2011-01-01

    The maintenance systems for long-term safety and repair costs reduction of equipment of nuclear power plants are stated. Planned maintenance contained the breakdown maintenance (BM) and the preventive maintenance, which consists of the time based maintenance (MBM) and the condition based maintenance (CBM). Explained are the characteristics of equipments, maintenance methods, maintenance solutions and the self-evaluation maintenance power, damage mechanism and solutions, and monitoring tools and application. Stated are the maintenance system and application of monitoring technology, periodical maintenance, application of diagnosis, vibration monitoring techniques, decision of vibration monitoring, and application of monitoring techniques for improvement of maintenance. Illustrated are realization of planned maintenance by reorganization of maintenance, a trend of maintenance of equipments, table of classified maintenance systems, change of maintenance program, maintenance data and investigation of damage mechanism, examples of self-evaluation maintenance power, examples of analysis of damage of parts of equipments, evaluation of rotating machines by vibration method, examples of results of diagnosis of bearing of rotating machines, online maintenance system of Asahi Kasei Engineering Corporation, degradation pattern of pomp, estimation of lifetime by total vibration and vibration on acceleration, and improvement of equipments. (S.Y.)

  11. Ageing of insulation and diagnosis of electrical equipment through detection of partial discharge

    International Nuclear Information System (INIS)

    Lopez Vergara, T.; Velasco Bernal, C.

    1994-01-01

    Ageing in electrical equipment affects mainly its insulation system. Such ageing in the insulation system is determined by its organic nature, basically constituted by three families of materials: cellulose, resin and hydrocarbon. All of these are affected by high temperatures, which tend to produce a break in the molecular chains (if the temperatures are not too high) or carbonization and gasification of the material (if they are). The radiation absorbed by the insulating materials also destroys molecular chains, causing degradation of the material. The break of the molecular chains, especially in the polymer-based materials, fragments the material, mainly in areas subjected to mechanical forces and stresses. From the electrical point of view, fissures occurring the insulating material lead to a much lower dielectric strength in certain parts of the materials, which could produce partial discharge conditions. Therefore, the growth of partial discharges in electrical equipment items is frequently the consequences of ageing, and be used to evaluate their residual life. Empresarios Agrupados has developed a system to detect partial discharges which can be used while equipment is still in operation. The measurements taken with this system are sufficiently accurate and repetitive to be used in evaluating the condition of medium-voltage electrical equipment insulation. (Author)

  12. Diagnostic Performance of Mammographic Texture Analysis in the Differential Diagnosis of Benign and Malignant Breast Tumors.

    Science.gov (United States)

    Li, Zhiming; Yu, Lan; Wang, Xin; Yu, Haiyang; Gao, Yuanxiang; Ren, Yande; Wang, Gang; Zhou, Xiaoming

    2017-11-09

    The purpose of this study was to investigate the diagnostic performance of mammographic texture analysis in the differential diagnosis of benign and malignant breast tumors. Digital mammography images were obtained from the Picture Archiving and Communication System at our institute. Texture features of mammographic images were calculated. Mann-Whitney U test was used to identify differences between the benign and malignant group. The receiver operating characteristic (ROC) curve analysis was used to assess the diagnostic performance of texture features. Significant differences of texture features of histogram, gray-level co-occurrence matrix (GLCM) and run length matrix (RLM) were found between the benign and malignant breast group (P  .05). The AUROCs of imaging-based diagnosis, texture analysis, and imaging-based diagnosis combined with texture analysis were 0.873, 0.863, and 0.961, respectively. When imaging-based diagnosis was combined with texture analysis, the AUROC was higher than that of imaging-based diagnosis or texture analysis (P benign and malignant breast tumors. Furthermore, the combination of imaging-based diagnosis and texture analysis can significantly improve diagnostic performance. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. Image processing for medical diagnosis of human organs

    International Nuclear Information System (INIS)

    Tamura, Shin-ichi

    1989-01-01

    The report first describes expectations and needs for diagnostic imaging in the field of clinical medicine, radiation medicine in particular, viewed by the author as an image processing expert working at a medical institute. Then, medical image processing techniques are discussed in relation to advanced information processing techniques that are currently drawing much attention in the field of engineering. Finally, discussion is also made of practical applications of image processing techniques to diagnosis. In the field of clinical diagnosis, advanced equipment such as PACS (picture archiving and communication system) has come into wider use, and efforts have been made to shift from visual examination to more quantitative and objective diagnosis by means of such advanced systems. In clinical medicine, practical, robust systems are more useful than sophisticated ones. It is difficult, though important, to develop completely automatized diagnostic systems. The urgent, realistic goal, therefore, is to develop effective diagnosis support systems. In particular, operation support systems equipped with three-dimensional displays will be very useful. (N.K.)

  14. Patient and staff dose optimisation in nuclear medicine diagnosis methods

    International Nuclear Information System (INIS)

    Marta Wasilewska-Radwanska; Katarzyna Natkaniec

    2007-01-01

    Complete test of publication follows. The implementation of the Basic Safety Standards (BSS) Directive 96/29 on the protection of workers and general population against the danger arising from ionising radiation and the Directive 97/43 on health protection of individuals against dangers of ionising radiation in relation to medical exposure, known as the Medical Exposure Directive (MED), they started in Poland some years ago with the Polish Atomic Law and executive orders published by the Polish Government and Polish Health Minister. Poland's Government has applied for several years transitory period to complete implementation of the Directive 97/43/Euratom because of the technical, organising and economical problems related with this procedure. The most important task has arisen to prepare procedures according with the current state of knowledge in the area of Quality Assurance (QA) and Quality Control (QC) of medical equipment using ionising radiation in diagnosis. QA and QC in X-ray diagnosis equipment started to be introduced since several years ago and nowadays they are put in common practice in almost each X-ray laboratory in Poland. As result, the nuclear medicine departments must follows the new legislation which has imposed also obligatory necessity of regular Quality Assurance and Quality Control of equipment and procedures for preparing and using radiopharmaceuticals. Documentation for QA system in nuclear medicine includes, among others, quality book, general procedures applied in diagnosis, description of specific procedures prepared in accordance with the rules in current legislation. The physical parameters of equipment (gamma camera, SPECT) undergo the basic tests and some special ones. The basic tests are carried out by staff of the nuclear medicine department. Units with accreditation perform special tests annually. The basic test for planar gamma camera includes: measurement of radioactivity, measurement of background, estimation of photons energy

  15. NN-Es Fault Diagnosis Method in Nuclear Power Equipment Based on Concept Lattice

    International Nuclear Information System (INIS)

    Liu Yongkuo; Xie Chunli; Xia Hong

    2010-01-01

    In order to improve the fault diagnosis accuracy of nuclear power plant,neural network and expert systems were combined to give full play to their advantages. In this paper, the concept lattice was applied to get the object properties, extracting the core attributes, dispensable attributes and relative necessary attributes from a large number raw data of fault symptoms.Based on these attributes, neural networks with different levels of importance were designed to improve the learning speed and diagnosis accuracy, and the diagnosis results of the neural networks were verified by using rule-based reasoning expert system. To verify the accuracy of this method, some simulation experiments about the typical faults of nuclear power plant were conducted. And the simulation results show that it is feasible to diagnose nuclear power plant faults with the confederation diagnosis methods combined the neural networks based on the concept lattice theory and expert system, with the distinctive features such as the efficiency of neural network learning, less calculation and reliability of diagnosis results and so on. (authors)

  16. Ways to Determine the Technical Status of the Vehicles’ Braking System by Means of General Diagnosis

    Directory of Open Access Journals (Sweden)

    Todea Paul

    2017-06-01

    Full Text Available Vehicles’ breaking system is one of the basic elements that lead to the maintenance of technical and road safety during transport activities on public roads or other special conditions. Therefore, particular attention is paid to all maintenance work planned or occasionally carried out on such system, as a high coefficient of vehicles availability results in an increased percentage of their productivity. Of course, there is diagnosis equipment for each element, and the brake booths within MOT centres accurately indicate the values of the measured parameters, following repair, adjustment and control operations for troubleshooting. Still, there are certain cases requesting the check of breaking system either analytically or by field experiments, i.e. when vehicles are driven on rough and rugged ground, during military specific missions and activities, where their performance no longer allows specialized equipment or when such equipment does not exist. This works presents alternatives to determine the technical condition of the braking system by means of typical solutions for the general diagnosis type.

  17. Automated Risk Control in Medical Imaging Equipment Management Using Cloud Application

    Directory of Open Access Journals (Sweden)

    Sally M. Ghanem

    2018-01-01

    Full Text Available Medical imaging equipment (MIE is the baseline of providing patient diagnosis in healthcare facilities. However, that type of equipment poses high risk for patients, operators, and environment in terms of technology and application. Considering risk management in MIE management is rarely covered in literature. The study proposes a methodology that controls risks associated with MIE management. The methodology is based on proposing a set of key performance indicators (KPIs that lead to identify a set of undesired events (UDEs, and through a risk matrix, a risk level is evaluated. By using cloud computing software, risks could be controlled to be manageable. The methodology was verified by using a data set of 204 pieces of MIE along 104 hospitals, which belong to Egyptian Ministry of Health. Results point to appropriateness of proposed KPIs and UDEs in risk evaluation and control. Thus, the study reveals that optimizing risks taking into account the costs has an impact on risk control of MIE management.

  18. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  19. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  20. Control Performance Management in Industrial Automation Assessment, Diagnosis and Improvement of Control Loop Performance

    CERN Document Server

    Jelali, Mohieddine

    2013-01-01

    Control Performance Management in Industrial Automation provides a coherent and self-contained treatment of a group of methods and applications of burgeoning importance to the detection and solution of problems with control loops that are vital in maintaining product quality, operational safety, and efficiency of material and energy consumption in the process industries. The monograph deals with all aspects of control performance management (CPM), from controller assessment (minimum-variance-control-based and advanced methods), to detection and diagnosis of control loop problems (process non-linearities, oscillations, actuator faults), to the improvement of control performance (maintenance, re-design of loop components, automatic controller re-tuning). It provides a contribution towards the development and application of completely self-contained and automatic methodologies in the field. Moreover, within this work, many CPM tools have been developed that goes far beyond available CPM packages. Control Perform...

  1. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  2. Should diagnosis codes from emergency department data be used for case selection for emergency department key performance indicators?

    Science.gov (United States)

    Howell, Stuart C; Wills, Rachael A; Johnston, Trisha C

    2014-02-01

    The aim of the present study was to assess the suitability of emergency department (ED) discharge diagnosis for identifying patient cohorts included in the definitions of key performance indicators (KPIs) that are used to evaluate ED performance. Hospital inpatient episodes of care with a principal diagnosis that corresponded to an ED-defined KPI were extracted from the Queensland Hospital Admitted Patient Data Collection (QHAPDC) for the year 2010-2011. The data were then linked to the corresponding ED patient record and the diagnoses applied in the two settings were compared. The asthma and injury cohorts produced favourable results with respect to matching the QHAPDC principal diagnosis with the ED discharge diagnosis. The results were generally modest when the QHAPDC principal diagnosis was upper respiratory tract infection, poisoning and toxic effects or a mental health diagnosis, and were quite poor for influenza. There is substantial variation in the capture of patient cohorts using discharge diagnosis as recorded on Queensland Hospital Emergency Department data. WHAT IS KNOWN ABOUT THE TOPIC? There are several existing KPIs that are defined according to the diagnosis recorded on ED data collections. However, there have been concerns over the quality of ED diagnosis in Queensland and other jurisdictions, and the value of these data in identifying patient cohorts for the purpose of assessing ED performance remains uncertain. WHAT DOES THIS PAPER ADD? This paper identifies diagnosis codes that are suitable for use in capturing the patient cohorts that are used to evaluate ED performance, as well as those codes that may be of limited value. WHAT ARE THE IMPLICATIONS FOR PRACTITIONERS? The limitations of diagnosis codes within ED data should be understood by those seeking to use these data items for healthcare planning and management or for research into healthcare quality and outcomes.

  3. Proposed limiting values for performance criteria in acceptance testing of diagnostic X-ray equipment in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Baeuml, A.

    1989-01-01

    In the Federal Republic of Germany a new X-ray ordinance came into force in 1988 containing a specific paragraph on quality assurance for all medical X-ray units stipulating acceptance tests, regular checks and supervision by medical bodies and the competent authorities. Acceptance testing is to be performed by engineers from equipment suppliers of manufacturers in new and existing installations. It is expected that the service engineers will adjust the equipment in such a way as to obtain optimal performance before measurements are made, the results of which are to be stated in a certificate describing quality status of the equipment. A working group has developed guidelines for these acceptance tests. Items to be measured are reported and proposed limiting values and their tolerances are discussed. (author)

  4. Proposed limiting values for performance criteria in acceptance testing of diagnostic X-ray equipment in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Baeuml, A.

    1989-01-01

    In the Federal Republic of Germany a new X-ray ordinance came into force in 1988 containing a specific paragraph on quality assurance for all medical X-ray units stipulating acceptance tests, regular checks and supervision by medical bodies and the competent authorities. Acceptance testing is to be performed by engineers from the equipment suppliers or manufacturers in new and also existing installations. It is expected that the service engineers will adjust the equipment in such a way as to obtain optimal performance before measurements are made, the results of which are to be stated in a certificate describing the quality status of the equipment. A working group has developed guidelines for these acceptance tests. The items to be measured are reported and the proposed limiting values and their tolerances are discussed. (author)

  5. Fault diagnosis and performance evaluation for high current LIA based on radial basis function neural network

    International Nuclear Information System (INIS)

    Yang Xinglin; Wang Huacen; Chen Nan; Dai Wenhua; Li Jin

    2006-01-01

    High current linear induction accelerator (LIA) is a complicated experimental physics device. It is difficult to evaluate and predict its performance. this paper presents a method which combines wavelet packet transform and radial basis function (RBF) neural network to build fault diagnosis and performance evaluation in order to improve reliability of high current LIA. The signal characteristics vectors which are extracted based on energy parameters of wavelet packet transform can well present the temporal and steady features of pulsed power signal, and reduce data dimensions effectively. The fault diagnosis system for accelerating cell and the trend classification system for the beam current based on RBF networks can perform fault diagnosis and evaluation, and provide predictive information for precise maintenance of high current LIA. (authors)

  6. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  7. FUSRAP equipment concept development study

    International Nuclear Information System (INIS)

    Hinerman, K.B.; Smith, R.E.

    1981-01-01

    Under DOE contract, Dalton-Dalton-Newport, Inc. is performing an engineering evaluation of three selected FUSRAP sites in an effort to generate equipment concepts to perform remedial action for retrieval, packaging, storing, and transporting contaminated soil and other debris. Along with this engineering evaluation, an analysis of state and Federal regulations was made which had significant impact on the selected equipment and costs for each remedial action concept

  8. Free Recall Episodic Memory Performance Predicts Dementia Ten Years prior to Clinical Diagnosis: Findings from the Betula Longitudinal Study

    Directory of Open Access Journals (Sweden)

    Carl-Johan Boraxbekk

    2015-05-01

    Full Text Available Background/Aims: Early dementia diagnosis is a considerable challenge. The present study examined the predictive value of cognitive performance for a future clinical diagnosis of late-onset Alzheimer's disease or vascular dementia in a random population sample. Methods: Cognitive performance was retrospectively compared between three groups of participants from the Betula longitudinal cohort. Group 1 developed dementia 11-22 years after baseline testing (n = 111 and group 2 after 1-10 years (n = 280; group 3 showed no deterioration towards dementia during the study period (n = 2,855. Multinomial logistic regression analysis was used to investigate the predictive value of tests reflecting episodic memory performance, semantic memory performance, visuospatial ability, and prospective memory performance. Results: Age- and education-corrected performance on two free recall episodic memory tests significantly predicted dementia 10 years prior to clinical diagnosis. Free recall performance also predicted dementia 11-22 years prior to diagnosis when controlling for education, but not when age was added to the model. Conclusion: The present results support the suggestion that two free recall-based tests of episodic memory function may be useful for detecting individuals at risk of developing dementia 10 years prior to clinical diagnosis.

  9. Device for diagnoising abnormalities of equipments

    International Nuclear Information System (INIS)

    Nakano, Hiroshi.

    1986-01-01

    Purpose: To measure the collision energy easily and at high accuracy by applying impact shocks at known collision energy from a simulated acoustic wave generator and using the generated acoustic signal as reference data. Constitution: A plurality of acoustic detectors are attached to the surface of a nuclear reactor pressure vessel. These acoustic detectors are connected respectively to an abnormality diagnosis device for equipments. Then, when metal obstacles collide against the inner surface of the reactor pressure vessel, acoustic signals generated upon collision are detected by the acoustic detectors and acoustic information thus obtained from the acoustic detectors determines the colliding position of the metal obstacles by means of the abnormality diagnosis device and then the collision energy is measured. In this case, by applying impact shocks at known collision energy near the colliding position of metal obstacles determined by the abnormality diagnosis device, collision energy can be determined at a higher accuracy. (Kawakami, Y.)

  10. The development of special equipment amplitude detection instrument based on DSP

    International Nuclear Information System (INIS)

    Dai Sidan; Chen Ligang; Lan Peng; Wang Huiting; Zhang Liangxu; Wang Lin

    2014-01-01

    Development and industrial application of special equipment plays an important role in the development of nuclear energy process. Equipment development process need to do a lot of tests, amplitude detection is a key test,it can analysis the device's electromechanical and physical properties. In the industrial application, the amplitude detection can effectively reflect the operational status of the current equipment, the equipment can also be a certain degree of fault diagnosis, identify problems in a timely manner. The main development target in this article is amplitude detection of special equipment. This article describes the development of special equipment amplitude detection instrument. The instrument uses a digital signal processor (DSP) as the central processing unit, and uses the DSP + CPLD + high-speed AD technology to build a complete set of high-precision signal acquisition and analysis processing systems, rechargeable lithium battery as the powered device. It can do a online monitoring of special equipment amplitude, speed parameters by acquiring and analysing the tachometer signal in the special equipment, and locally display through the LCD screen. (authors)

  11. Performance of Very Small Robotic Fish Equipped with CMOS Camera

    Directory of Open Access Journals (Sweden)

    Yang Zhao

    2015-10-01

    Full Text Available Underwater robots are often used to investigate marine animals. Ideally, such robots should be in the shape of fish so that they can easily go unnoticed by aquatic animals. In addition, lacking a screw propeller, a robotic fish would be less likely to become entangled in algae and other plants. However, although such robots have been developed, their swimming speed is significantly lower than that of real fish. Since to carry out a survey of actual fish a robotic fish would be required to follow them, it is necessary to improve the performance of the propulsion system. In the present study, a small robotic fish (SAPPA was manufactured and its propulsive performance was evaluated. SAPPA was developed to swim in bodies of freshwater such as rivers, and was equipped with a small CMOS camera with a wide-angle lens in order to photograph live fish. The maximum swimming speed of the robot was determined to be 111 mm/s, and its turning radius was 125 mm. Its power consumption was as low as 1.82 W. During trials, SAPPA succeeded in recognizing a goldfish and capturing an image of it using its CMOS camera.

  12. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  13. Monitoring and aid to diagnosis of French PWRs

    International Nuclear Information System (INIS)

    Jousellin, A.; Trenty, A.; Benas, J.C.; Renault, Y.; Busquet, J.L.; Mouhamed, B.

    1996-01-01

    In order to improvise safety and availability in its nuclear power plants, EDF has designed a new generation of monitoring systems integrated into a workstation for monitoring and aid to diagnosis (PSAD). These systems perform on-line monitoring of the main power plant components and PSAD stations provide homogeneous aid to diagnosis which enable plant personnel to pinpoint the mechanical behavior of plant equipments. The objective of PSAD is to provide them with high-efficiency and user-friendly tools which can considerably free them from routine tasks. The first version of the prototype is working on a French plant at Tricastin. This version includes the software host structure and two monitoring functions: the reactor coolant pumps and the turbo-generator monitoring functions. Internal Structures Monitoring (ISM) and Loose Parts Detection function (LPD) are under development and should be integrated into PSAD prototype in 1996. (authors)

  14. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  15. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  16. Validation of the Dri-Dot Latex agglutination and IgM lateral flow assays for the diagnosis of typhoid fever in an Egyptian population

    NARCIS (Netherlands)

    Nakhla, Isabelle; El Mohammady, Hanan; Mansour, Adel; Klena, John D.; Hassan, Khaled; Sultan, Yehia; Pastoor, Rob; Abdoel, Theresia H.; Smits, Henk

    2011-01-01

    Laboratory confirmation of typhoid fever is essential for appropriate medical treatment. Blood culture is a standard test for diagnosis of typhoid fever, but well-equipped diagnostic facilities to perform culture are seldom available in endemic areas. We retrospectively compared 2 diagnostic field

  17. Calibration and qualification of equipment in the pharmaceutical industry: emphasis on radiopharmaceuticals production

    International Nuclear Information System (INIS)

    Melero, Laura T.U.H.; Silva, Katia S. da S.; Zanette, Camila; Araujo, Elaine B. de; Mengatti, Jair

    2011-01-01

    The calibration and qualification of equipment are listed items in RDC number 17 of 2010 which refers about the Good Manufacturing Practice (GMP) of medicaments and RDC number 63 of 2009 which refers about GMP of Radiopharmaceuticals. Both are essential requirements since they are involved in process control to attend the regulatory criteria and are a key part of the validation process. The aim of this work is presenting the importance of calibration and qualification, and the routine use of equipment and facilities in industrial scale production of radiopharmaceuticals in the IPEN/CNEN. The radiopharmacy of IPEN is a pharmaceutical industry that produces radiopharmaceuticals for diagnosis and therapy. It was the pioneer institute in production of radioisotopes and radiopharmaceuticals in Brazil. Currently, 38 products are distributed to the nuclear medicine centers, including primary radioisotopes, labeled molecules and lyophilized reagents for labeling with technetium-99m. To fulfill the GMP requirements for quality assurance of products, several factors must be considered including infrastructure, equipment and raw materials beyond, obviously, the whole production process should be controlled until the release of the final product. Therefore, the calibration and verification of equipment, instruments and other appliances used in the production and quality control should be performed. A program of calibration, qualification and requalification of equipment used in production and quality control of radiopharmaceuticals is necessary for the validation of production processes and analytical methods, and should be established for quality assurance of produced radiopharmaceuticals. (author)

  18. Calibration and qualification of equipment in the pharmaceutical industry: emphasis on radiopharmaceuticals production

    Energy Technology Data Exchange (ETDEWEB)

    Melero, Laura T.U.H.; Silva, Katia S. da S.; Zanette, Camila; Araujo, Elaine B. de; Mengatti, Jair [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2011-07-01

    The calibration and qualification of equipment are listed items in RDC number 17 of 2010 which refers about the Good Manufacturing Practice (GMP) of medicaments and RDC number 63 of 2009 which refers about GMP of Radiopharmaceuticals. Both are essential requirements since they are involved in process control to attend the regulatory criteria and are a key part of the validation process. The aim of this work is presenting the importance of calibration and qualification, and the routine use of equipment and facilities in industrial scale production of radiopharmaceuticals in the IPEN/CNEN. The radiopharmacy of IPEN is a pharmaceutical industry that produces radiopharmaceuticals for diagnosis and therapy. It was the pioneer institute in production of radioisotopes and radiopharmaceuticals in Brazil. Currently, 38 products are distributed to the nuclear medicine centers, including primary radioisotopes, labeled molecules and lyophilized reagents for labeling with technetium-99m. To fulfill the GMP requirements for quality assurance of products, several factors must be considered including infrastructure, equipment and raw materials beyond, obviously, the whole production process should be controlled until the release of the final product. Therefore, the calibration and verification of equipment, instruments and other appliances used in the production and quality control should be performed. A program of calibration, qualification and requalification of equipment used in production and quality control of radiopharmaceuticals is necessary for the validation of production processes and analytical methods, and should be established for quality assurance of produced radiopharmaceuticals. (author)

  19. The performance of a prototype device designed to evaluate general quality parameters of X-ray equipment

    International Nuclear Information System (INIS)

    Murata, C.H.; Fernandes, D.C.; Lavínia, N.C.; Caldas, L.V.E; Pires, S.R; Medeiros, R.B.

    2014-01-01

    The performance of radiological equipment can be assessed using non-invasive methods and portable instruments that can analyze an X-ray beam with just one exposure. These instruments use either an ionization chamber or a state solid detector (SSD) to evaluate X-ray beam parameters. In Brazil, no such instruments are currently being manufactured; consequently, these instruments come at a higher cost to users due to importation taxes. Additionally, quality control tests are time consuming and impose a high workload on the X-ray tubes when evaluating their performance parameters. The assessment of some parameters, such as the half-value layer (HVL), requires several exposures; however, this can be reduced by using a SSD that requires only a single exposure. One such SSD uses photodiodes designed for high X-ray sensitivity without the use of scintillation crystals. This sensitivity allows one electron-hole pair to be created per 3.63 eV of incident energy, resulting in extremely high and stable quantum efficiencies. These silicon photodiodes operate by absorbing photons and generating a flow of current that is proportional to the incident power. The aim of this study was to show the response of the solid sensor PIN RD100A detector in a multifunctional X-ray analysis system that is designed to evaluate the average peak voltage (kVp), exposure time, and HVL of radiological equipment. For this purpose, a prototype board that uses four SSDs was developed to measure kVp, exposure time, and HVL using a single exposure. The reproducibility and accuracy of the results were compared to that of different X-ray beam analysis instruments. The kVp reproducibility and accuracy results were 2% and 3%, respectively; the exposure time reproducibility and accuracy results were 2% and 1%, respectively; and the HVL accuracy was ±2%. The prototype's methodology was able to calculate these parameters with appropriate reproducibility and accuracy. Therefore, the prototype can be considered

  20. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  1. A maturidade e o desempenho das equipes no ambiente produtivo Maturity and performance of teams in the production environment

    Directory of Open Access Journals (Sweden)

    Robson Luiz Montanari

    2011-01-01

    Full Text Available O presente estudo teve como objetivo identificar a influência da maturidade das equipes no desempenho das suas atividades. Para tanto, sete equipes de uma prestadora de serviços foram analisadas. Os procedimentos metodológicos foram permeados por entrevistas, observações não participantes, aplicação de dois questionários e três instrumentos. Os resultados permitiram identificar influências da maturidade no desempenho das equipes em ambiente produtivo, bem como verificar que ela está intimamente relacionada ao comportamento revelado no desempenho dentro do grupo. Nas equipes com maior maturidade, comportamentos indesejáveis ao desempenho coletivo não apareceram na mesma proporção aos das equipes com menor grau de maturidade. Infere-se que, à medida que a maturidade dos grupos é aumentada, pela presença de integrantes mais comprometidos e com confiança mútua, os membros das equipes mudam o comportamento alterando a forma de funcionamento do grupo e transformando-se em uma equipe. Se as equipes em estudo, dentro de uma sequência evolutiva de funcionamento, aumentarem sua maturidade, tendem a influenciar positivamente o seu desempenho no ambiente produtivo em que estão inseridas.This study aimed to identify the influence of maturity of the teams in carrying out its activities. Seven teams of a service provider industry were analyzed. The data were collected through interviews, non-participant observations, application of two questionnaires and three instruments. The results showed the influence of maturity on the performance of teams in the production environment and that it is closely related to the individual behavior within the group. In the teams with more maturity, the presence of undesirable collective behaviors did not occur in the same proportion of that of teams with lesser degrees of maturity. It can be inferred that as the maturity of the groups is increased by the presence of more committed members with mutual

  2. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  3. Stages of syphilis in South China - a multilevel analysis of early diagnosis.

    Science.gov (United States)

    Wong, Ngai Sze; Huang, Shujie; Zheng, Heping; Chen, Lei; Zhao, Peizhen; Tucker, Joseph D; Yang, Li Gang; Goh, Beng Tin; Yang, Bin

    2017-01-31

    Early diagnosis of syphilis and timely treatment can effectively reduce ongoing syphilis transmission and morbidity. We examined the factors associated with the early diagnosis of syphilis to inform syphilis screening strategic planning. In an observational study, we analyzed reported syphilis cases in Guangdong Province, China (from 2014 to mid-2015) accessed from the national case-based surveillance system. We categorized primary and secondary syphilis cases as early diagnosis and categorized latent and tertiary syphilis as delayed diagnosis. Univariate analyses and multivariable logistic regressions were performed to identify the factors associated with early diagnosis. We also examined the factors associated with early diagnosis at the individual and city levels in multilevel logistic regression models with cases nested by city (n = 21), adjusted for age at diagnosis and gender. Among 83,944 diagnosed syphilis cases, 22% were early diagnoses. The city-level early diagnosis rate ranged from 7 to 46%, consistent with substantial geographic variation as shown in the multilevel model. Early diagnosis was associated with cases presenting to specialist clinics for screening, being male and attaining higher education level. Cases received syphilis testing in institutions and hospitals, and diagnosed in hospitals were less likely to be in early diagnosis. At the city-level, cases living in a city equipped with more hospitals per capita were less likely to be early diagnosis. To enhance early diagnosis of syphilis, city-specific syphilis screening strategies with a mix of passive and client/provider-initiated testing might be a useful approach.

  4. Application of monitoring, diagnosis, and prognosis in thermal performance analysis for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyeong Min; Heo, Gyun Young [Kyung Hee University, Yongin (Korea, Republic of); Na, Man Gyun [Chosun University, Gwangju (Korea, Republic of)

    2014-12-15

    As condition-based maintenance (CBM) has risen as a new trend, there has been an active movement to apply information technology for effective implementation of CBM in power plants. This motivation is widespread in operations and maintenance, including monitoring, diagnosis, prognosis, and decision-making on asset management. Thermal efficiency analysis in nuclear power plants (NPPs) is a longstanding concern being updated with new methodologies in an advanced IT environment. It is also a prominent way to differentiate competitiveness in terms of operations and maintenance costs. Although thermal performance tests implemented using industrial codes and standards can provide officially trustworthy results, they are essentially resource-consuming and maybe even a hind-sighted technique rather than a foresighted one, considering their periodicity. Therefore, if more accurate performance monitoring can be achieved using advanced data analysis techniques, we can expect more optimized operations and maintenance. This paper proposes a framework and describes associated methodologies for in-situ thermal performance analysis, which differs from conventional performance monitoring. The methodologies are effective for monitoring, diagnosis, and prognosis in pursuit of CBM. Our enabling techniques cover the intelligent removal of random and systematic errors, deviation detection between a best condition and a currently measured condition, degradation diagnosis using a structured knowledge base, and prognosis for decision-making about maintenance tasks. We also discuss how our new methods can be incorporated with existing performance tests. We provide guidance and directions for developers and end-users interested in in-situ thermal performance management, particularly in NPPs with large steam turbines.

  5. Application of monitoring, diagnosis, and prognosis in thermal performance analysis for nuclear power plants

    International Nuclear Information System (INIS)

    Kim, Hyeong Min; Heo, Gyun Young; Na, Man Gyun

    2014-01-01

    As condition-based maintenance (CBM) has risen as a new trend, there has been an active movement to apply information technology for effective implementation of CBM in power plants. This motivation is widespread in operations and maintenance, including monitoring, diagnosis, prognosis, and decision-making on asset management. Thermal efficiency analysis in nuclear power plants (NPPs) is a longstanding concern being updated with new methodologies in an advanced IT environment. It is also a prominent way to differentiate competitiveness in terms of operations and maintenance costs. Although thermal performance tests implemented using industrial codes and standards can provide officially trustworthy results, they are essentially resource-consuming and maybe even a hind-sighted technique rather than a foresighted one, considering their periodicity. Therefore, if more accurate performance monitoring can be achieved using advanced data analysis techniques, we can expect more optimized operations and maintenance. This paper proposes a framework and describes associated methodologies for in-situ thermal performance analysis, which differs from conventional performance monitoring. The methodologies are effective for monitoring, diagnosis, and prognosis in pursuit of CBM. Our enabling techniques cover the intelligent removal of random and systematic errors, deviation detection between a best condition and a currently measured condition, degradation diagnosis using a structured knowledge base, and prognosis for decision-making about maintenance tasks. We also discuss how our new methods can be incorporated with existing performance tests. We provide guidance and directions for developers and end-users interested in in-situ thermal performance management, particularly in NPPs with large steam turbines.

  6. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  7. Performance of a resistive plate chamber equipped with a new prototype of amplified front-end electronics

    CERN Document Server

    Marchisone, Massimiliano

    2016-01-01

    ALICE is the LHC experiment dedicated to the study of heavy-ion collisions. At forward rapidity a muon spectrometer detects muons from low mass mesons, quarkonia, open heavy-flavor hadrons as well as weak bosons. A muon selection based on transverse momentum is made by a trigger system composed of 72 resistive plate chambers (RPCs). For the LHC Run 1 and the ongoing Run 2 the RPCs have been equipped with a non-amplified FEE called ADULT. However, in view of an increase in luminosity expected for Run 3 (2021-2023) the possibility to use an amplified FEE has been explored in order to improve the counting rate limitation and to prevent the aging of the detector, by reducing the charge per hit. A prototype of this new electronics (FEERIC) has been developed and tested first with cosmic rays before equipping one RPC in the ALICE cavern with it. In this talk the most important performance indicators - efficiency, dark current, dark rate, cluster size and total charge - of an RPC equipped with this new FEE will be r...

  8. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  9. Deep Space Network equipment performance, reliability, and operations management information system

    Science.gov (United States)

    Cooper, T.; Lin, J.; Chatillon, M.

    2002-01-01

    The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

  10. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  11. Quantification of glibenclamide in cleaning samples of pharmaceutical equipment through high performance liquid chromatography

    International Nuclear Information System (INIS)

    Baeza Fonte, Alen Nils; Diaz Aguila, Elsa Eneida; Martinez Alfonso; Nancy

    2012-01-01

    to submit a selective analytical method for quantization of glibenclamide in cleaning samples of pharmaceutical equipment using high performance liquid chromatography. The mobile phase consisted of an equal mixing of acetonitrile/phosphate buffer KH 2 PO 4 ; with 0.037 mol/L concentration pH 5.25 and flow of 1.5 mL/min, in a Nucleosil 100 C8 column. Glibenclamide was injected with progesterone as internal standard and using an UV detector= 230 nm

  12. Computer-Based Image Analysis for Plus Disease Diagnosis in Retinopathy of Prematurity: Performance of the "i-ROP" System and Image Features Associated With Expert Diagnosis.

    Science.gov (United States)

    Ataer-Cansizoglu, Esra; Bolon-Canedo, Veronica; Campbell, J Peter; Bozkurt, Alican; Erdogmus, Deniz; Kalpathy-Cramer, Jayashree; Patel, Samir; Jonas, Karyn; Chan, R V Paul; Ostmo, Susan; Chiang, Michael F

    2015-11-01

    We developed and evaluated the performance of a novel computer-based image analysis system for grading plus disease in retinopathy of prematurity (ROP), and identified the image features, shapes, and sizes that best correlate with expert diagnosis. A dataset of 77 wide-angle retinal images from infants screened for ROP was collected. A reference standard diagnosis was determined for each image by combining image grading from 3 experts with the clinical diagnosis from ophthalmoscopic examination. Manually segmented images were cropped into a range of shapes and sizes, and a computer algorithm was developed to extract tortuosity and dilation features from arteries and veins. Each feature was fed into our system to identify the set of characteristics that yielded the highest-performing system compared to the reference standard, which we refer to as the "i-ROP" system. Among the tested crop shapes, sizes, and measured features, point-based measurements of arterial and venous tortuosity (combined), and a large circular cropped image (with radius 6 times the disc diameter), provided the highest diagnostic accuracy. The i-ROP system achieved 95% accuracy for classifying preplus and plus disease compared to the reference standard. This was comparable to the performance of the 3 individual experts (96%, 94%, 92%), and significantly higher than the mean performance of 31 nonexperts (81%). This comprehensive analysis of computer-based plus disease suggests that it may be feasible to develop a fully-automated system based on wide-angle retinal images that performs comparably to expert graders at three-level plus disease discrimination. Computer-based image analysis, using objective and quantitative retinal vascular features, has potential to complement clinical ROP diagnosis by ophthalmologists.

  13. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  14. Fleet equipment performance measurement preventive maintenance model : final report.

    Science.gov (United States)

    2014-04-01

    The concept of preventive maintenance is very important in the effective management and deployment of : vehicle fleets. The Texas Department of Transportation (TxDOT) operates a large fleet of on-road and offroad : equipment. Newer engines and vehicl...

  15. Survey of mammography practice in Croatia: Equipment performance, image quality and dose

    International Nuclear Information System (INIS)

    Faj, D.; Stimac, D.; Ivezic, Z.; Kasabasic, M.; Ivkovic, A.; Posedel, D.; Kubelka, D.; Ilakovac, V.; Brnic, Z.; Bjelac, O.C.

    2008-01-01

    A national audit of mammography equipment performance, image quality and dose has been conducted in Croatia. Film-processing parameters, optical density (OD), average glandular dose (AGD) to the standard breast, viewing conditions and image quality were examined using TOR(MAM) test object. Average film gradient ranged from 2.6 to 3.7, with a mean of 3.1. Tube voltage used for imaging of the standard 45 mm polymethylmethacrylate phantom ranged from 24 to 34 kV, and OD ranged from 0.75 to 1.94 with a mean of 1.26. AGD to the standard breast ranged from 0.4 to 2.3 mGy with a mean of 1.1 mGy. Besides clinical conditions, the authors have imaged the standard phantom in the referent conditions with 28 kV and OD as close as possible to 1.5. Then, AGD ranged from 0.5 to 2.6 mGy with a mean of 1.3 mGy. Image viewing conditions were generally unsatisfying with ambient light up to 500 lx and most of the viewing boxes with luminance between 1000 and 2000 cd per m 2 . TOR(MAM) scoring of images taken in clinical and referent conditions was done by local radiologists in local image viewing conditions and by the referent radiologist in good image viewing conditions. Importance of OD and image viewing conditions for diagnostic information were analysed. The survey showed that the main problem in Croatia is the lack of written quality assurance/quality control (QA/QC) procedures. Consequently, equipment performance, image quality and dose are unstable and activities to improve image quality or to reduce the dose are not evidence-based. This survey also had an educational purpose, introducing in Croatia the QC based on European Commission Guidelines. (authors)

  16. Enhancement of equipment services for Kozloduy NPP

    International Nuclear Information System (INIS)

    Schultz, Christophe

    2013-01-01

    Conclusion After 5 years of maintenance services, KNPP and AREVA have continuously intensified their partnership Close cooperation between KNPP, AREVA Local Office Engineers and OEM experts Involvement of sophisticated tools for diagnostics and condition monitoring Performance of engineering services and obsolescence evaluation Possibilities to perform equipment modernization of Electrical and IC equipment in future

  17. Detector design for active fault diagnosis in closed-loop systems

    DEFF Research Database (Denmark)

    Sekunda, André Krabdrup; Niemann, Hans Henrik; Poulsen, Niels Kjølstad

    2018-01-01

    Fault diagnosis of closed-loop systems is extremely relevant for high-precision equipment and safety critical systems. Fault diagnosis is usually divided into 2 schemes: active and passive fault diagnosis. Recent studies have highlighted some advantages of active fault diagnosis based on dual Youla......-Jabr-Bongiorno-Kucera parameters. In this paper, a method for closed-loop active fault diagnosis based on statistical detectors is given using dual Youla-Jabr-Bongiorno-Kucera parameters. The goal of this paper is 2-fold. First, the authors introduce a method for measuring a residual signal subject to white noise. Second...

  18. MONITORING OF THE PERFORMANCE EFFICIENCY OF THE EQUIPMENT AT THE ENTERPRISES OF AVIATION INSTRUMENTATION

    Directory of Open Access Journals (Sweden)

    Petr P. Dobrov

    2016-01-01

    Full Text Available The article elaborates the proposals to improve the systems for monitoring performance of the equipment at the enterprises of aviation instrument. The relevance of the study due to the fact that the aviation instrument-making industry of the Russian Federation can play a role as a key factor in enhancing the competitiveness of the national economy. Currently, the global aviation market is fairly saturated, it competition is not between individual companies and between the aviation powers. The role of an efficient industrial production is largely dependent on the amount, structure, technical condition and the level of utilization of fixed assets. Specificity of high-tech high-tech production presupposes the existence of a specific fleet of expensive and unique equipment; a high degree of novelty products, single or small-scale type of production that determines the high cost of production of a unit of production; high demands on the staff . The paper noted that the production capacity is an essential tool for production planning process, which allows to determine the optimal work shifts Park main technological equipment and production program to justify the enterprises of sphere of aviation instrument. On the basis of the modification of OEE method, a stochastic model is proposed, which allows to display the efficiency of the productive capacity of the high-tech enterprises of sphere of aviation instrument in the form of multi-dimensional size and much more accurately identify the relationship between its elements.

  19. A compliance testing program for diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Hutchinson, D.E.; Cobb, B.J.; Jacob, C.S.

    1999-01-01

    Compliance testing is nominally that part of a quality assurance program dealing with those aspects of X-ray equipment performance that are subject to radiation control legislation. Quality assurance programs for medical X-ray equipment should be an integral part of the quality culture in health care. However while major hospitals and individual medical centers may implement such programs with some diligence, much X-ray equipment can remain unappraised unless there is a comprehensive regulatory inspection program or some form of compulsion on the equipment owner to implement a testing program. Since the late 1950s all X-ray equipment in the State of Western Australia has been inspected by authorized officers acting on behalf of the Radiological Council, the regulatory authority responsible for administration of the State's Radiation Safety Act. However, economic constraints, coupled with increasing X-ray equipment numbers and a geographically large State have significantly affected the inspection rate. Data available from inspections demonstrate that regular compliance and performance checks are essential in order to ensure proper performance and to minimize unnecessary patient and operator dose. To ensure that diagnostic X-ray equipment complies with accepted standards and performance criteria, the regulatory authority introduced a compulsory compliance testing program for all medical, dental and chiropractic diagnostic X-ray equipment effective from 1 January 1997

  20. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators

  1. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  2. Performance Test of the Salt transfer and Pellet fabrication of UCl3 Making Equipment for Electrorefining

    International Nuclear Information System (INIS)

    Woo, M. S.; Jin, H. J.; Park, G. I.; Park, S. B.

    2014-01-01

    The process to produce a uranium chloride salt includes two steps: a reaction process of gaseous chlorine with liquid cadmium to form the CdCl 2 occurring in a Cd layer, followed by a process to produce UCl 3 by the reaction of U in the LiCl-KCl eutectic salt and CdCl 2 . Chemical reaction is next chlorination reaction; - Cd chlorination : Cd + Cl2 → CdCl 2 - U chlorination : 3CdCl2 + 2U → 3Cd + 2UCl 3 The apparatus for producing UCl 3 consists of a chlorine gas generator, a uranium chlorinator, a Cd distiller, the pelletizer, a off-gas wet scrubber and a dry scrubber. Salt transfer system set among reactors to transfer salt at 500 .deg. C. The temperature of the reactants is maintained at about 600 .deg. C. After the reaction is completed in the uranium chlorinator, The Salt product is transferred to the Cd distiller to decrease residual Cd concentration in the salts, and then salt is transferred to the mould of pelletizer by a transfer system to fabricate pellet type salt. Performance test of the salt transfer and pellet fabrication of its equipment was tested in this work. Performance test of the salt transfer and pellet fabrication of UCl3 making equipment for Electrorefining carried out in this work. The result of equipment test is that melted salt at 600 .deg. C was easy transferred by salt transfer equipment heated at 500 .deg. C. In this time, salt transfer was carried out by argon gas pressurization at 3bar. When velocity of salt transfer was controlled under reduce pressure, velocity of salt transfer was difficult to control. And when salt pellet was fabricated by the mold of pelletizer heated at 90 .deg. C better than mold of pelletizer heated at 200 .deg. C because salt melted prevent leakage from mold of pelletizer

  3. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  4. Field size and centring for conventional X-ray equipment

    International Nuclear Information System (INIS)

    Klimpel, H.; Kreienfeld, H.; Overbeck, R.

    1989-01-01

    Since 1973, all X-ray equipment for medical applications in the Federal Republic of Germany has had to be examined according to the requirements of the German ''Rontgenverordnung'' before it is used on patients and after each essential modification of design or construction. These examinations are carried out by inspectors appointed by the authorities, e.g. TUV. The field size adjustment and the centring of the radiation beam in relation to the image reception area is checked, along with other tests. To increase quality assurance in X-ray diagnosis, since the mid-1980s X-ray equipment has also been subject to in-service inspections to an increasing extent. (author)

  5. Evaluation of the quality parameters of mobile X-ray units equipment used for radiodiagnostic in public institutions of Sergipe

    International Nuclear Information System (INIS)

    Oliveira, Celso A.; Santos, Lucas R. dos; Silva, Fabio A.R.; Souza, Divanizia N.

    2008-01-01

    This project was started having as main objective to observe the diagnosis quality offered by mobile x-ray units utilized in a health care institution. In this work we are reporting the first results obtained from three equipment used by a public institution inspected on the state of Sergipe, Brazil. During the verification visits at institution the radiology technicians were questioned about specific maintenances performed on the equipment and the operating procedures used. Moreover, some beams parameters were verified as dose, dose rate, and peak voltage and exposition time. The obtained results showed a good index of reproducibility and linearity of the operation parameters, of the kerma air rate and exposition time. However, to the kVp tests were observed variations up to 20% between the nominal value used and the value measured on the X-ray units. The test results of the focal point are in accordance with the acceptable standards. The analyses of equipment and the answered questionnaire showed that have not been performed periodic maintenances in the equipment, therefore some of the equipment do not present satisfactory requirements of operating, their do not make use of luminous field nether collimator or the scale meter to checking the source to surface distance. The main factor that can explains the negative results is the absence of a continue quality program associated with the unsatisfactory maintenances. The health care institutions evaluated are introducing a permanent quality program to the X-ray devices. (author)

  6. The Parameters Selection of PSO Algorithm influencing On performance of Fault Diagnosis

    Directory of Open Access Journals (Sweden)

    He Yan

    2016-01-01

    Full Text Available The particle swarm optimization (PSO is an optimization algorithm based on intelligent optimization. Parameters selection of PSO will play an important role in performance and efficiency of the algorithm. In this paper, the performance of PSO is analyzed when the control parameters vary, including particle number, accelerate constant, inertia weight and maximum limited velocity. And then PSO with dynamic parameters has been applied on the neural network training for gearbox fault diagnosis, the results with different parameters of PSO are compared and analyzed. At last some suggestions for parameters selection are proposed to improve the performance of PSO.

  7. Research on Model-Based Fault Diagnosis for a Gas Turbine Based on Transient Performance

    Directory of Open Access Journals (Sweden)

    Detang Zeng

    2018-01-01

    Full Text Available It is essential to monitor and to diagnose faults in rotating machinery with a high thrust–weight ratio and complex structure for a variety of industrial applications, for which reliable signal measurements are required. However, the measured values consist of the true values of the parameters, the inertia of measurements, random errors and systematic errors. Such signals cannot reflect the true performance state and the health state of rotating machinery accurately. High-quality, steady-state measurements are necessary for most current diagnostic methods. Unfortunately, it is hard to obtain these kinds of measurements for most rotating machinery. Diagnosis based on transient performance is a useful tool that can potentially solve this problem. A model-based fault diagnosis method for gas turbines based on transient performance is proposed in this paper. The fault diagnosis consists of a dynamic simulation model, a diagnostic scheme, and an optimization algorithm. A high-accuracy, nonlinear, dynamic gas turbine model using a modular modeling method is presented that involves thermophysical properties, a component characteristic chart, and system inertial. The startup process is simulated using this model. The consistency between the simulation results and the field operation data shows the validity of the model and the advantages of transient accumulated deviation. In addition, a diagnostic scheme is designed to fulfill this process. Finally, cuckoo search is selected to solve the optimization problem in fault diagnosis. Comparative diagnostic results for a gas turbine before and after washing indicate the improved effectiveness and accuracy of the proposed method of using data from transient processes, compared with traditional methods using data from the steady state.

  8. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  9. The Fault Diagnosis of Rolling Bearing Based on Ensemble Empirical Mode Decomposition and Random Forest

    OpenAIRE

    Qin, Xiwen; Li, Qiaoling; Dong, Xiaogang; Lv, Siqi

    2017-01-01

    Accurate diagnosis of rolling bearing fault on the normal operation of machinery and equipment has a very important significance. A method combining Ensemble Empirical Mode Decomposition (EEMD) and Random Forest (RF) is proposed. Firstly, the original signal is decomposed into several intrinsic mode functions (IMFs) by EEMD, and the effective IMFs are selected. Then their energy entropy is calculated as the feature. Finally, the classification is performed by RF. In addition, the wavelet meth...

  10. Diagnosis of thyroid diseases. The diagnosis value of the various methods of examination

    Energy Technology Data Exchange (ETDEWEB)

    Pfannenstiel, P [Stiftung Deutsche Klinik fuer Diagnostik, Wiesbaden (Germany, F.R.). Fachbereich Nuklearmedizin

    1980-03-01

    The recommendations of the thyroid section of the Deutsche Gesellschaft fuer Endokrinologie take account of practical requirements and serve as a basis for assessing the indications of the various diagnostic methods in view of their value, expenditure, and hazards. Progress in methodology and recent scientific findings have been taken into account as well as economic aspects and the available equipment. In spite of all the possibilities offered by modern laboratory diagnosis, the diagnosis and theory of thyroid diseases should always depend on a special anamnesis and a physical examination of the patient. The measured values must agree with the patient's complaints and with clinical findings. In diagnoses involving several steps, one should always start with simple in-vitro techniques in order to spare the patient stress. Functional diagnosis of thyroid diseases are supplemented by thyroid scintiscanning with short-lived radionuclides and by thyroid cytology. Experience and precise knowledge help to 'save expense and radiation'. Of course, uncertain diagnoses and untypical findings require a more extensive use of diagnostic means than diagnosis that are more or less clinically proved.

  11. Order of the 29. of January 2010 approving the decision n. 2009-DC-0146 made on the 16. of July 2010 by the Nuclear Safety Authority (ASN), modified by the decision n. 2009-DC-0162 of the 20. of October 2009, defining the list electric equipment generating X rays which are hold or used for purposes of biomedical research or medical, dental, forensics or veterinary diagnosis and submitted to a declaration regime on the account of the first paragraph of the article R. 1333-19 of the Public Health code and abrogating the 23 April 1969 order related to equipment and installations using ionizing radiations on medical purposes

    International Nuclear Information System (INIS)

    2010-01-01

    This legal document indicates the list of equipment which must now be declared to the ASN (the French Nuclear Safety Authority), specifies that any use of these equipment in conditions other than normal requires an authorization on the account of an article of the Public Health Code. A list of equipment is given which are used in medical and forensics radio-diagnosis, in biomedical research, in dental and veterinary radio-diagnosis

  12. Order of the 29. of January 2010 approving the decision n. 2009-DC-0146 made on the 16. of July 2010 by the Nuclear Safety Authority (ASN), modified by the decision n. 2009-DC-0162 of the 20. of October 2009, defining the list electric equipment generating X rays which are hold or used for purposes of biomedical research or medical, dental, forensics or veterinary diagnosis and submitted to a declaration regime on the account of the first paragraph of the article R. 1333-19 of the Public Health code and abrogating the 23 April 1969 order related to equipment and installations using ionizing radiations on medical purposes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This legal document indicates the list of equipment which must now be declared to the ASN (the French Nuclear Safety Authority), specifies that any use of these equipment in conditions other than normal requires an authorization on the account of an article of the Public Health Code. A list of equipment is given which are used in medical and forensics radio-diagnosis, in biomedical research, in dental and veterinary radio-diagnosis

  13. Chief objectives of the development of X-ray equipment engineering in Russia

    International Nuclear Information System (INIS)

    Blinov, N.N.; Varshavskij, Yu.V.; Zelikman, M.I.

    1997-01-01

    Based on the world tendencies in the development of X-ray diagnostic instruments the main problems int he development of domestic X-ray diagnostic equipment engineering are analyzed. Variant of basic equipment for modern X-ray room for digital biomedical radiography is proposed. Tendencies int he instrumentation of X-ray diagnosis are the following ones: X-ray computerized tomograph creation, development of telecontrolled X-ray computerized. complexes for biomedical X-ray complexes for digital biomedical radiography, automation of the film development

  14. Incidental diagnosis of diseases on un-enhanced helical computed tomography performed for ureteric colic

    Directory of Open Access Journals (Sweden)

    Ather M Hammad

    2003-03-01

    Full Text Available Abstract Background Patients presenting in the emergency room with flank pain suggestive of acute ureteric colic may have alternative underlying conditions mimicking ureteric stones. An early diagnosis and appropriate treatment for other causes of flank pain is important. The majority of centers around the world are increasingly using un-enhanced helical CT (UHCT for evaluation of ureteric colic. This study was conducted to determine the incidence and spectrum of significant incidental diagnoses established or suggested on UHCT performed for suspected renal/ureteric colic. Methods Urologist and radiologist reviewed 233 consecutive UHCT, performed for suspected renal/ureteral colic along with assessment of the medical records. Radiological diagnoses of clinical entities not suspected otherwise were analyzed. All other relevant radiological, biochemical and serological investigations and per-operative findings were also noted. Results Ureteral calculi were identified in 148 examinations (64%, findings of recent passage of calculi in 10 (4% and no calculus in 75 examinations (32%. Overall the incidental findings (additional or alternative diagnosis were found in 28 (12% CT scans. Twenty (71% of these diagnoses were confirmed by per-operative findings, biopsy, and other radiological and biochemical investigations or on clinical follow up. Conclusion A wide spectrum of significant incidental diagnoses can be identified on UHCT performed for suspected renal/ureteral colic. In the present series of 233 consecutive CT examinations, the incidence of incidental diagnosis was 12%.

  15. Controlled air incinerator for radioactive waste. Volume I. Rationale, process, equipment, performance, and recommendations

    International Nuclear Information System (INIS)

    Neuls, A.S.; Draper, W.E.; Koenig, R.A.; Newmyer, J.M.; Warner, C.L.

    1982-11-01

    This two-volume report is a detailed design and operating documentation of the Los Alamos National Laboratory Controlled Air Incinerator (CAI) and is an aid to technology transfer to other Department of Energy contractor sites and the commercial sector. Volume I describes the CAI process, equipment, and performance, and it recommends modifications based on Los Alamos experience. It provides the necessary information for conceptual design and feasibility studies. Volume II provides descriptive engineering information such as drawings specifications, calculations, and costs. It aids duplication of the process at other facilities

  16. Performance of Ultrasound in the Diagnosis of Gout in a Multi-Center Study

    DEFF Research Database (Denmark)

    Ogdie, Alexis; Taylor, William J; Neogi, Tuhina

    2017-01-01

    OBJECTIVES: To examine the performance of ultrasound for the diagnosis of gout using presence of monosodium urate (MSU) crystals as the gold standard. METHODS: We analyzed data from the Study for Updated Gout Classification Criteria (SUGAR), a large, multi-center observational cross-sectional stu...

  17. Improvements in Thermal Performance of Mango Hot-water Treatment Equipments: Data Analysis, Mathematical Modelling and Numerical-computational Simulation

    Directory of Open Access Journals (Sweden)

    Elder M. Mendoza Orbegoso

    2017-06-01

    Full Text Available Mango is one of the most popular and best paid tropical fruits in worldwide markets, its exportation is regulated within a phytosanitary quality control for killing the “fruit fly”. Thus, mangoes must be subject to hot-water treatment process that involves their immersion in hot water over a period of time. In this work, field measurements, analytical and simulation studies are developed on available hot-water treatment equipment called “Original” that only complies with United States phytosanitary protocols. These approaches are made to characterize the fluid-dynamic and thermal behaviours that occur during the mangoes’ hot-water treatment process. Then, analytical model and Computational fluid dynamics simulations are developed for designing new hot-water treatment equipment called “Hybrid” that simultaneously meets with both United States and Japan phytosanitary certifications. Comparisons of analytical results with data field measurements demonstrate that “Hybrid” equipment offers a better fluid-dynamic and thermal performance than “Original” ones.

  18. The performance of a prototype device designed to evaluate general quality parameters of X-ray equipment

    Science.gov (United States)

    Murata, C. H.; Fernandes, D. C.; Lavínia, N. C.; Caldas, L. V. E.; Pires, S. R.; Medeiros, R. B.

    2014-02-01

    The performance of radiological equipment can be assessed using non-invasive methods and portable instruments that can analyze an X-ray beam with just one exposure. These instruments use either an ionization chamber or a state solid detector (SSD) to evaluate X-ray beam parameters. In Brazil, no such instruments are currently being manufactured; consequently, these instruments come at a higher cost to users due to importation taxes. Additionally, quality control tests are time consuming and impose a high workload on the X-ray tubes when evaluating their performance parameters. The assessment of some parameters, such as the half-value layer (HVL), requires several exposures; however, this can be reduced by using a SSD that requires only a single exposure. One such SSD uses photodiodes designed for high X-ray sensitivity without the use of scintillation crystals. This sensitivity allows one electron-hole pair to be created per 3.63 eV of incident energy, resulting in extremely high and stable quantum efficiencies. These silicon photodiodes operate by absorbing photons and generating a flow of current that is proportional to the incident power. The aim of this study was to show the response of the solid sensor PIN RD100A detector in a multifunctional X-ray analysis system that is designed to evaluate the average peak voltage (kVp), exposure time, and HVL of radiological equipment. For this purpose, a prototype board that uses four SSDs was developed to measure kVp, exposure time, and HVL using a single exposure. The reproducibility and accuracy of the results were compared to that of different X-ray beam analysis instruments. The kVp reproducibility and accuracy results were 2% and 3%, respectively; the exposure time reproducibility and accuracy results were 2% and 1%, respectively; and the HVL accuracy was ±2%. The prototype's methodology was able to calculate these parameters with appropriate reproducibility and accuracy. Therefore, the prototype can be considered

  19. How the reverse supply chain impacts the financial performance of original equipment manufacturers

    DEFF Research Database (Denmark)

    Larsen, Samuel

    This thesis examines the financial impact of a firm’s reverse supply chain (RSC). Specifically, the thesis examines the two questions of how the RSC can contribute to the financial performance of the firm and which factors are decisive for the RSC’s financial contribution. The thesis focuses...... on original equipment manufacturers. The thesis results show that the RSC can contribute to the financial performance of the firm in more than 20 different ways, which the thesis defines as functions of the RSC. Examples of RSC-functions are 1) resale of recovered end-products to price-focused market segments...... in the firm’s primary markets, 2) resale to customers in new markets (in e.g. emerging economies), and 3) sale of used materials back the firm’s original material suppliers. The firm’ RSC can conduct several RSC-functions simultaneously and the financial benefits from operating these RSC-functions differ...

  20. Characterization and performances of DOSION, a dosimetry equipment dedicated to radiobiology experiments taking place at GANIL

    Energy Technology Data Exchange (ETDEWEB)

    Boissonnat, Guillaume, E-mail: boissonnat@lpccaen.in2p3.fr [LPC (Normandie Univ-ENSICAEN-UNICAEN-CNRS/IN2P3), 6 Bd Maréchal Juin, 14050 Caen (France); Fontbonne, Jean-Marc [LPC (Normandie Univ-ENSICAEN-UNICAEN-CNRS/IN2P3), 6 Bd Maréchal Juin, 14050 Caen (France); Balanzat, Emmanuel [CIMAP (CEA/DSM-CNRS/INP-ENSICAEN-UNICAEN), Bd Henri Becquerel, 14076 Caen (France); Boumard, Frederic; Carniol, Benjamin [LPC (Normandie Univ-ENSICAEN-UNICAEN-CNRS/IN2P3), 6 Bd Maréchal Juin, 14050 Caen (France); Cassimi, Amine [CIMAP (CEA/DSM-CNRS/INP-ENSICAEN-UNICAEN), Bd Henri Becquerel, 14076 Caen (France); Colin, Jean; Cussol, Daniel; Etasse, David; Fontbonne, Cathy [LPC (Normandie Univ-ENSICAEN-UNICAEN-CNRS/IN2P3), 6 Bd Maréchal Juin, 14050 Caen (France); Frelin, Anne-Marie [GANIL (CEA/DSM-CNRS/IN2P3), Bd Henri Becquerel, 14076 Caen (France); Hommet, Jean; Salvador, Samuel [LPC (Normandie Univ-ENSICAEN-UNICAEN-CNRS/IN2P3), 6 Bd Maréchal Juin, 14050 Caen (France)

    2017-06-01

    Currently, radiobiology experiments using heavy ions at GANIL (Grand Accélérateur National d′Ions Lourds) are conducted under the supervision of the CIMAP (Center for research on Ions, MAterials and Photonics). In this context, a new beam monitoring equipment named DOSION has been developed. It allows to perform measurements of accurate fluence and dose maps in near real time for each biological sample irradiated. In this paper, we present the detection system, its design, performances, calibration protocol and measurements performed during radiobiology experiments. This setup is currently available for any radiobiology experiments if one wishes to correlate one's own sample analysis to state-of-the-art dosimetric references.

  1. Field performance evaluation during fog-dominated wintertime of a newly developed denuder-equipped PM1 sampler.

    Science.gov (United States)

    Singh, Dharmendra Kumar; Lakshay; Gupta, Tarun

    2014-03-01

    This study presents the performance evaluation of a novel denuder-equipped PM1 (particles having aerodynamic diameter less than 1 μm) sampler, tested during fog-dominated wintertime, in the city of Kanpur, India. One PM1 sampler and one denuder-equipped PM1 sampler were co-located to collect ambient PM1 for 25 days. The mean PM1 mass concentration measured on foggy days with the PM1 sampler and the denuder-equipped PM1 sampler was found to be 165.95 and 135.48 μg/m(3), respectively. The mean PM1 mass concentration measured on clear days with the PM1 sampler and the denuder-equipped PM1 sampler was observed to be 159.66 and 125.14 μg/m(3), respectively. The mass concentration with denuder-fitted PM1 sampler for both foggy and clear days was always found less than the PM1 sampler. The same drift was observed in the concentrations of water-soluble ions and water-soluble organic carbon (WSOC). Moreover, it was observed that the use of denuder leads to a significant reduction in the PM positive artifact. The difference in the concentration of chemical species obtained by two samplers indicates that the PM1 sampler without denuder had overestimated the concentrations of chemical species in a worst-case scenario by almost 40 %. Denuder-fitted PM1 sampler can serve as a useful sampling tool in estimating the true values for nitrate, ammonium, potassium, sodium and WSOC present in the ambient PM.

  2. Development of microstructure to optimise mechanical performance of power generation equipment

    International Nuclear Information System (INIS)

    Marshall, P.

    1986-11-01

    The factors responsible for the development of microstructure in CEGB construction ceramics and steels is assessed as a function of composition, thermomechanical treatment, thermal ageing and environmental degradation. The relationships between microstructure and mechanical properties (tensile, toughness, creep and fatigue) of relevance to structures operating in power generation equipment is then developed in quantitative terms. The conclusions from the assessment are as follows: 1 The relationship between microstructure and mechanical properties of construction ceramics and steels used in the power generation industry has been assessed. 2 Factors which significantly influence microstructure and thus mechanical properties are chemical composition, thermomechanical treatment, ageing and environmental degradation. The influence of such microstructural changes in tensile, toughness, fatigue and creep properties of ceramics and steels is assessed. 3 The benefits arising from an understanding of materials behaviour are discussed in terms of improved materials and the assessment of plant performance. (author)

  3. Fiscal 1998 survey report. Welfare equipment (Development of human friendly care support intelligent equipment / Development of home welfare equipment system); 1998 nendo chosa hokokusho. Fukushi kiki (human friendly kaigo shien chino kiki kaihatsu / zaitaku fukushi kiki system kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Since disabled persons increase with a progress of an aging society, while a care power decreases with a decrease in birth rate, development and practical use of the welfare equipment contributing to self-support of aged and handicapped persons, reduction of doctors' or therapists' burdens, and as a result, reduction of medical care costs are desirable. Among them, R and D and practical use are expected of the advanced welfare equipment and system based on human engineering technology contributing to improvement of lives of aged and handicapped persons, and support of nurses and cares of disabled persons. In fiscal 1998, on both human friendly care support intelligent equipment and home welfare equipment system, this project clarified essential technical issues based on the future view, selected some themes to be newly developed in the future, and surveyed and evaluated the details of their R and D concretely. For the former, 'heart disease diagnosis and treatment total support system,' and for the latter, 'body function rehabilitation support system' were surveyed. (NEDO)

  4. Stages of syphilis in South China – a multilevel analysis of early diagnosis

    Directory of Open Access Journals (Sweden)

    Ngai Sze Wong

    2017-01-01

    Full Text Available Abstract Background Early diagnosis of syphilis and timely treatment can effectively reduce ongoing syphilis transmission and morbidity. We examined the factors associated with the early diagnosis of syphilis to inform syphilis screening strategic planning. Methods In an observational study, we analyzed reported syphilis cases in Guangdong Province, China (from 2014 to mid-2015 accessed from the national case-based surveillance system. We categorized primary and secondary syphilis cases as early diagnosis and categorized latent and tertiary syphilis as delayed diagnosis. Univariate analyses and multivariable logistic regressions were performed to identify the factors associated with early diagnosis. We also examined the factors associated with early diagnosis at the individual and city levels in multilevel logistic regression models with cases nested by city (n = 21, adjusted for age at diagnosis and gender. Results Among 83,944 diagnosed syphilis cases, 22% were early diagnoses. The city-level early diagnosis rate ranged from 7 to 46%, consistent with substantial geographic variation as shown in the multilevel model. Early diagnosis was associated with cases presenting to specialist clinics for screening, being male and attaining higher education level. Cases received syphilis testing in institutions and hospitals, and diagnosed in hospitals were less likely to be in early diagnosis. At the city-level, cases living in a city equipped with more hospitals per capita were less likely to be early diagnosis. Conclusions To enhance early diagnosis of syphilis, city-specific syphilis screening strategies with a mix of passive and client/provider-initiated testing might be a useful approach.

  5. Diagnosis of primary ciliary dyskinesia: potential options for resource-limited countries

    Directory of Open Access Journals (Sweden)

    Nisreen Rumman

    2017-01-01

    Full Text Available Primary ciliary dyskinesia is a genetic disease of ciliary function leading to chronic upper and lower respiratory tract symptoms. The diagnosis is frequently overlooked because the symptoms are nonspecific and the knowledge about the disease in the primary care setting is poor. Additionally, none of the available tests is accurate enough to be used in isolation. These tests are expensive, and need sophisticated equipment and expertise to analyse and interpret results; diagnosis is therefore only available at highly specialised centres. The diagnosis is particularly challenging in countries with limited resources due to the lack of such costly equipment and expertise. In this review, we discuss the importance of early and accurate diagnosis especially for countries where the disease is clinically prevalent but diagnostic tests are lacking. We review the diagnostic tests available in specialised centres (nasal nitric oxide, high-speed video microscopy, transmission electron microscopy, immunofluorescence and genetics. We then consider modifications that might be considered in less well-resourced countries whilst maintaining acceptable accuracy.

  6. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  7. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  8. Radon removal equipment based on aeration: A literature study of tests performed in Sweden between 1981 and 1996

    International Nuclear Information System (INIS)

    Mjoenes, L.

    2000-02-01

    In Sweden some principles to reduce the radon concentration in drinking water were tested in the beginning of the 1980s. Spray aeration under atmospheric pressure, diffused bubble aeration, aeration in the pressure tank and different combinations of these principles were studied. Aeration in the drill hole and adsorption on granulated activated char-coal were also tested. The best results, about 70 % reduction, were obtained with aeration in the pressure tank with a spray system combined with diffused air bubbling. The Oerebro project in the beginning of the 1990s included on site testing of five different aeration solutions: Aeration in the drill hole, aeration in the storage tank, ejector aeration, shallow tray aeration and packed column aeration. The radon removal efficiency varied between 20 % and 99 %. In 1994 a study intended to test the radon removal capacity of different water treatment equipment was performed. Six units of radon separators were included but most of the tested equipment was installed for other water treatment purposes. The performed measurements showed that the only types of equipment that reduce the radon concentration efficiently are radon separators and reverse osmosis filters. The radon removal capacity of the radon separators varied between 23 % and 97 %. In 1996 the nine most common radon separators on the Swedish market were tested. The results showed that the tested radon removal equipment worked well, although the technical quality and chosen technical solutions were not always the best. The radon removal capacity of the units participating in this test was in most cases between 96 and 99 %. In some cases the capacity exceeded 99 %. In order to reach this radon removal capacity the water must be recirculated in a storage tank under atmospheric pressure

  9. Radon removal equipment based on aeration: A literature study of tests performed in Sweden between 1981 and 1996

    Energy Technology Data Exchange (ETDEWEB)

    Mjoenes, L

    2000-02-01

    In Sweden some principles to reduce the radon concentration in drinking water were tested in the beginning of the 1980s. Spray aeration under atmospheric pressure, diffused bubble aeration, aeration in the pressure tank and different combinations of these principles were studied. Aeration in the drill hole and adsorption on granulated activated char-coal were also tested. The best results, about 70 % reduction, were obtained with aeration in the pressure tank with a spray system combined with diffused air bubbling. The Oerebro project in the beginning of the 1990s included on site testing of five different aeration solutions: Aeration in the drill hole, aeration in the storage tank, ejector aeration, shallow tray aeration and packed column aeration. The radon removal efficiency varied between 20 % and 99 %. In 1994 a study intended to test the radon removal capacity of different water treatment equipment was performed. Six units of radon separators were included but most of the tested equipment was installed for other water treatment purposes. The performed measurements showed that the only types of equipment that reduce the radon concentration efficiently are radon separators and reverse osmosis filters. The radon removal capacity of the radon separators varied between 23 % and 97 %. In 1996 the nine most common radon separators on the Swedish market were tested. The results showed that the tested radon removal equipment worked well, although the technical quality and chosen technical solutions were not always the best. The radon removal capacity of the units participating in this test was in most cases between 96 and 99 %. In some cases the capacity exceeded 99 %. In order to reach this radon removal capacity the water must be recirculated in a storage tank under atmospheric pressure.

  10. Fault diagnosis of power transformer based on fault-tree analysis (FTA)

    Science.gov (United States)

    Wang, Yongliang; Li, Xiaoqiang; Ma, Jianwei; Li, SuoYu

    2017-05-01

    Power transformers is an important equipment in power plants and substations, power distribution transmission link is made an important hub of power systems. Its performance directly affects the quality and health of the power system reliability and stability. This paper summarizes the five parts according to the fault type power transformers, then from the time dimension divided into three stages of power transformer fault, use DGA routine analysis and infrared diagnostics criterion set power transformer running state, finally, according to the needs of power transformer fault diagnosis, by the general to the section by stepwise refinement of dendritic tree constructed power transformer fault

  11. Diagnosis system for nozzles in high voltage equipment; Sistema de diagnostico para boquillas en equipos de alta tension

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Nino, Jose; Escorsa Morales, Oscar [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico); Lopez Azamar, Ernesto [Comision Federal de Electricidad (Mexico)

    2000-07-01

    The nozzles used in high voltage electrical equipment, such as power transformers and circuit breakers, constitute the elements that present greater fault risk. On the other hand, the faults in the nozzles cause, in most of the cases catastrophic damages, that expose to risk the maintenance personnel of the plant and the peripheral equipment. With the purpose of contributing with on-line monitoring techniques that indicate the nozzles condition and allow to anticipate their possible fault, the Instituto de Investigaciones Electricas (IIE) performed for the laboratory of tests of equipment and materials (LAPEM) of Comision Federal de Electricidad (CFE), a project for the development of a system for the measurement of capacitive currents in these equipments. This system allows to determine the variation in capacitance and dielectric losses, and to determine the presence of internal partial discharges in nozzles of 115, 230 and 400 kV. With this information it is possible to determine the condition of the internal isolation of the nozzles and retire them from service before deterioration takes place that puts in danger the integrity of the equipment. The management of electrical equipment of the Instituto de Investigaciones Electricas developed for LAPEM a system that measures capacitive currents of power transformer nozzles. This system was designed with the purpose of installing it in a transformer of a 400 kV machine, in the fossil power station of Tula, Hidalgo, of the Comision Federal de Electricidad. [Spanish] Las boquillas empleadas en los equipos electricos de alta tension, como transformadores de potencia e interruptores, constituyen los elementos que presentan mayor riesgo de falla. Por otro lado, las fallas en las boquillas provocan en la mayoria de los casos danos catastroficos que ponen en riesgo al personal de mantenimiento de la planta y al equipo periferico. Con la finalidad de aportar tecnicas de monitoreo en linea que indiquen el estado de las

  12. Performance Test of the Salt transfer and Pellet fabrication of UCl{sub 3} Making Equipment for Electrorefining

    Energy Technology Data Exchange (ETDEWEB)

    Woo, M. S.; Jin, H. J.; Park, G. I.; Park, S. B. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    The process to produce a uranium chloride salt includes two steps: a reaction process of gaseous chlorine with liquid cadmium to form the CdCl{sub 2} occurring in a Cd layer, followed by a process to produce UCl{sub 3} by the reaction of U in the LiCl-KCl eutectic salt and CdCl{sub 2}. Chemical reaction is next chlorination reaction; - Cd chlorination : Cd + Cl2 → CdCl{sub 2} - U chlorination : 3CdCl2 + 2U → 3Cd + 2UCl{sub 3} The apparatus for producing UCl{sub 3} consists of a chlorine gas generator, a uranium chlorinator, a Cd distiller, the pelletizer, a off-gas wet scrubber and a dry scrubber. Salt transfer system set among reactors to transfer salt at 500 .deg. C. The temperature of the reactants is maintained at about 600 .deg. C. After the reaction is completed in the uranium chlorinator, The Salt product is transferred to the Cd distiller to decrease residual Cd concentration in the salts, and then salt is transferred to the mould of pelletizer by a transfer system to fabricate pellet type salt. Performance test of the salt transfer and pellet fabrication of its equipment was tested in this work. Performance test of the salt transfer and pellet fabrication of UCl3 making equipment for Electrorefining carried out in this work. The result of equipment test is that melted salt at 600 .deg. C was easy transferred by salt transfer equipment heated at 500 .deg. C. In this time, salt transfer was carried out by argon gas pressurization at 3bar. When velocity of salt transfer was controlled under reduce pressure, velocity of salt transfer was difficult to control. And when salt pellet was fabricated by the mold of pelletizer heated at 90 .deg. C better than mold of pelletizer heated at 200 .deg. C because salt melted prevent leakage from mold of pelletizer.

  13. Instrumentation for radon measurement and diagnosis

    International Nuclear Information System (INIS)

    Whyte, N.; Ellacott, K.; Brabant, L.

    1990-01-01

    Knowledge of existing protocols and guidelines, coupled with equipment acumen can make for a successful endeavor in the radon field. But where do you collect a users perspective on radon equipment? Obtaining a first hand understanding of how radon detection equipment may be applied can be a lengthy and expensive process. In this paper first principals of progeny collection, and counting, are covered. Use of Thomson and Nielsen equipment to screen, and diagnose radon will e presented. Equipment performance in a wide variety of field applications and in calibration chambers will be brought to light. The distinctive nature and versatility of the equipment will e outlined with applications information, system performance, and unique configurations

  14. Adoption of rapid diagnostic tests for the diagnosis of malaria, a preliminary analysis of the Global Fund program data, 2005 to 2010.

    Directory of Open Access Journals (Sweden)

    Jinkou Zhao

    Full Text Available The World Health Organization Guidelines for the Treatment of Malaria, in 2006 and 2010, recommend parasitological confirmation of malaria before commencing treatment. Although microscopy has been the mainstay of malaria diagnostics, the magnitude of diagnostic scale up required to follow the Guidelines suggests that rapid diagnostic tests (RDTs will be a large component. This study analyzes the adoption of rapid diagnostic testing in malaria programs supported by the Global Fund to fight AIDS, Tuberculosis and Malaria (Global Fund, the leading international funder of malaria control globally.We analyzed, for the period 2005 to 2010, Global Fund programmatic data for 81 countries on the quantity of RDTs planned; actual quantities of RDTs and artemisinin-based combination treatments (ACTs procured in 2009 and 2010; RDT-related activities including RDTs distributed, RDTs used, total diagnostic tests including RDTs and microscopy performed, health facilities equipped with RDTs; personnel trained to perform rapid diagnostic malaria test; and grant budgets allocated to malaria diagnosis. In 2010, diagnosis accounted for 5.2% of malaria grant budget. From 2005 to 2010, the procurement plans include148 million RDTs through 96 malaria grants in 81 countries. Around 115 million parasitological tests, including RDTs, had reportedly been performed from 2005 to 2010. Over this period, 123,132 health facilities were equipped with RDTs and 137,140 health personnel had been trained to perform RDT examinations. In 2009 and 2010, 41 million RDTs and 136 million ACTs were purchased. The ratio of procured RDTs to ACTs was 0.26 in 2009 and 0.34 in 2010.Global Fund financing has enabled 81 malaria-endemic countries to adopt WHO guidelines by investing in RDTs for malaria diagnosis, thereby helping improve case management of acute febrile illness in children. However, roll-out of parasitological diagnosis lags behind the roll-out of ACT-based treatment, and will

  15. A Novel Fault Diagnosis Method for Rotating Machinery Based on a Convolutional Neural Network.

    Science.gov (United States)

    Guo, Sheng; Yang, Tao; Gao, Wei; Zhang, Chen

    2018-05-04

    Fault diagnosis is critical to ensure the safety and reliable operation of rotating machinery. Most methods used in fault diagnosis of rotating machinery extract a few feature values from vibration signals for fault diagnosis, which is a dimensionality reduction from the original signal and may omit some important fault messages in the original signal. Thus, a novel diagnosis method is proposed involving the use of a convolutional neural network (CNN) to directly classify the continuous wavelet transform scalogram (CWTS), which is a time-frequency domain transform of the original signal and can contain most of the information of the vibration signals. In this method, CWTS is formed by discomposing vibration signals of rotating machinery in different scales using wavelet transform. Then the CNN is trained to diagnose faults, with CWTS as the input. A series of experiments is conducted on the rotor experiment platform using this method. The results indicate that the proposed method can diagnose the faults accurately. To verify the universality of this method, the trained CNN was also used to perform fault diagnosis for another piece of rotor equipment, and a good result was achieved.

  16. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  17. The UK market for gaseous emissions control equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The report analyses the changes in demand for gaseous emissions control equipment in the United Kingdom over the next 5 years. It discusses the factors affecting demand such as legislation reporting of environmental performance, and economic factors. It looks at environmental expenditure by UK industry. Markets are examined, for VOC abatement systems; thermal incinerators; adsorption equipment; catalytic oxidisers; absorption equipment; biological treatments; cryogenic equipment; SO{sub x} abatement equipment; wet FGD; wet dry FGD, dry scrubbers; NOx abatement systems; selective catalytic reduction; and selective non-catalytic reduction. Profiles are given of 16 leading suppliers.

  18. A Novel Data Hierarchical Fusion Method for Gas Turbine Engine Performance Fault Diagnosis

    Directory of Open Access Journals (Sweden)

    Feng Lu

    2016-10-01

    Full Text Available Gas path fault diagnosis involves the effective utilization of condition-based sensor signals along engine gas path to accurately identify engine performance failure. The rapid development of information processing technology has led to the use of multiple-source information fusion for fault diagnostics. Numerous efforts have been paid to develop data-based fusion methods, such as neural networks fusion, while little research has focused on fusion architecture or the fusion of different method kinds. In this paper, a data hierarchical fusion using improved weighted Dempster–Shaffer evidence theory (WDS is proposed, and the integration of data-based and model-based methods is presented for engine gas-path fault diagnosis. For the purpose of simplifying learning machine typology, a recursive reduced kernel based extreme learning machine (RR-KELM is developed to produce the fault probability, which is considered as the data-based evidence. Meanwhile, the model-based evidence is achieved using particle filter-fuzzy logic algorithm (PF-FL by engine health estimation and component fault location in feature level. The outputs of two evidences are integrated using WDS evidence theory in decision level to reach a final recognition decision of gas-path fault pattern. The characteristics and advantages of two evidences are analyzed and used as guidelines for data hierarchical fusion framework. Our goal is that the proposed methodology provides much better performance of gas-path fault diagnosis compared to solely relying on data-based or model-based method. The hierarchical fusion framework is evaluated in terms to fault diagnosis accuracy and robustness through a case study involving fault mode dataset of a turbofan engine that is generated by the general gas turbine simulation. These applications confirm the effectiveness and usefulness of the proposed approach.

  19. Assessing the Impact of Clothing and Individual Equipment (CIE) on Soldier Physical, Biomechanical, and Cognitive Performance Part 1: Test Methodology

    Science.gov (United States)

    2018-02-01

    29 during Soldier Equipment Configuration Impact on Performance: Establishing a Test Methodology for the...during ACSM’S resource manual for exercise testing and prescription Human Movement Science, 31(2), Proceedings of the 2016 American Biomechanics...Performance of Medium Rucksack Prototypes An investigation: Comparison of live-fire and weapon simulator test methodologies and the of three extremity armor

  20. 21 CFR 866.4830 - Rocket immunoelectro-phoresis equipment.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents... equipment for clinical use is a device used to perform a specific test on proteins by using a procedure...

  1. Evaluation of mammography equipment performance, dose and image quality in five Latin American countries

    Science.gov (United States)

    Brandan, M.-E.; Ruiz-Trejo, C.; Caspani, C. E. M.; Fleitas, I.; de-la-Mora, R.; Miranda, A. A.; Plazas, M.-C.; Betancourt, C.-M.; Borras, C.

    2001-10-01

    Under the auspices of PAHO/WHO, a multicentric investigation is carried out in five Latin American countries. Its aim is to correlate quality indicators of radiology services with the accuracy of the radiological interpretation as determined by a panel of radiology experts. We present preliminary results from mammographic imaging facilities. Evaluation of the equipment performance and dose measurements in 21 mammographic units show that, on the average, 75% of the units comply with recommendations issued by various organizations. An independent evaluation of the quality of the clinical images show strong variations among the different radiological services.

  2. Evaluation of mammography equipment performance, dose and image quality in five Latin American countries

    International Nuclear Information System (INIS)

    Brandan, M.-E.; Ruiz-Trejo, C.; Caspani, C. E. M.; Fleitas, I.; Mora, R. de la; Miranda, A. A.; Plazas, M.-C.; Betancourt, C.-M.; Borras, C.

    2001-01-01

    Under the auspices of PAHO/WHO, a multicentric investigation is carried out in five Latin American countries. Its aim is to correlate quality indicators of radiology services with the accuracy of the radiological interpretation as determined by a panel of radiology experts. We present preliminary results from mammographic imaging facilities. Evaluation of the equipment performance and dose measurements in 21 mammographic units show that, on the average, 75% of the units comply with recommendations issued by various organizations. An independent evaluation of the quality of the clinical images show strong variations among the different radiological services

  3. 30 CFR 77.501 - Electric distribution circuits and equipment; repair.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric distribution circuits and equipment... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.501 Electric distribution circuits and equipment; repair. No electrical work shall be performed on electric distribution circuits or equipment...

  4. Effects of Student-Performed Point-of-Care Ultrasound on Physician Diagnosis and Management of Patients in the Emergency Department.

    Science.gov (United States)

    Udrea, Daniel S; Sumnicht, Andrew; Lo, Deanna; Villarreal, Logan; Gondra, Stephanie; Chyan, Richard; Wisham, Audra; Dinh, Vi Am

    2017-07-01

    Despite the increasing integration of ultrasound training into medical education, there is an inadequate body of research demonstrating the benefits and practicality of medical student-performed point-of-care ultrasound (SP-POCUS) in the clinical setting. The primary purpose of this study was to evaluate the effects that SP-POCUS can have on physician diagnosis and management of patients in the emergency department, with a secondary purpose of evaluating the diagnostic accuracy of SP-POCUS. SP-POCUS examinations were performed in the emergency department by medical students who completed year one of a 4-year medical school curriculum with integrated ultrasound training. Scans were evaluated by an emergency physician who then completed a survey to record any changes in diagnosis and management. A total of 641 scans were performed on the 482 patients enrolled in this study. SP-POCUS resulted in a change in management in 17.3% of scans performed. For 12.4% of scans, SP-POCUS discovered a new diagnosis. SP-POCUS reduced time to disposition 33.5% of the time. Because of SP-POCUS, physicians avoided ordering an additional imaging study for 53.0% of the scans performed. There was 94.7% physician agreement with SP-POCUS diagnosis. This study showed that SP-POCUS is feasible and may potentially have a meaningful impact on physician diagnosis and management of patients in the emergency department. In addition, the implementation of SP-POCUS could serve as an ideal method of developing ultrasound skills in medical school while positively impacting patient care. Copyright © 2017 Elsevier Inc. All rights reserved.

  5. Representational Learning for Fault Diagnosis of Wind Turbine Equipment: A Multi-Layered Extreme Learning Machines Approach

    Directory of Open Access Journals (Sweden)

    Zhi-Xin Yang

    2016-05-01

    Full Text Available Reliable and quick response fault diagnosis is crucial for the wind turbine generator system (WTGS to avoid unplanned interruption and to reduce the maintenance cost. However, the conditional data generated from WTGS operating in a tough environment is always dynamical and high-dimensional. To address these challenges, we propose a new fault diagnosis scheme which is composed of multiple extreme learning machines (ELM in a hierarchical structure, where a forwarding list of ELM layers is concatenated and each of them is processed independently for its corresponding role. The framework enables both representational feature learning and fault classification. The multi-layered ELM based representational learning covers functions including data preprocessing, feature extraction and dimension reduction. An ELM based autoencoder is trained to generate a hidden layer output weight matrix, which is then used to transform the input dataset into a new feature representation. Compared with the traditional feature extraction methods which may empirically wipe off some “insignificant’ feature information that in fact conveys certain undiscovered important knowledge, the introduced representational learning method could overcome the loss of information content. The computed output weight matrix projects the high dimensional input vector into a compressed and orthogonally weighted distribution. The last single layer of ELM is applied for fault classification. Unlike the greedy layer wise learning method adopted in back propagation based deep learning (DL, the proposed framework does not need iterative fine-tuning of parameters. To evaluate its experimental performance, comparison tests are carried out on a wind turbine generator simulator. The results show that the proposed diagnostic framework achieves the best performance among the compared approaches in terms of accuracy and efficiency in multiple faults detection of wind turbines.

  6. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  7. High performance gamma measurements of equipment retrieved from Hanford high-level nuclear waste tanks

    International Nuclear Information System (INIS)

    Troyer, G.L.

    1997-01-01

    The cleanup of high level defense nuclear waste at the Hanford site presents several progressive challenges. Among these is the removal and disposal of various components from buried active waste tanks to allow new equipment insertion or hazards mitigation. A unique automated retrieval system at the tank provides for retrieval, high pressure washing, inventory measurement, and containment for disposal. Key to the inventory measurement is a three detector HPGe high performance gamma spectroscopy system capable of recovering data at up to 90% saturation (200,000 counts per second). Data recovery is based on a unique embedded electronic pulser and specialized software to report the inventory. Each of the detectors have different shielding specified through Monte Carlo simulation with the MCNP program. This shielding provides performance over a dynamic range of eight orders of magnitude. System description, calibration issues and operational experiences are discussed

  8. High performance gamma measurements of equipment retrieved from Hanford high-level nuclear waste tanks

    Energy Technology Data Exchange (ETDEWEB)

    Troyer, G.L.

    1997-03-17

    The cleanup of high level defense nuclear waste at the Hanford site presents several progressive challenges. Among these is the removal and disposal of various components from buried active waste tanks to allow new equipment insertion or hazards mitigation. A unique automated retrieval system at the tank provides for retrieval, high pressure washing, inventory measurement, and containment for disposal. Key to the inventory measurement is a three detector HPGe high performance gamma spectroscopy system capable of recovering data at up to 90% saturation (200,000 counts per second). Data recovery is based on a unique embedded electronic pulser and specialized software to report the inventory. Each of the detectors have different shielding specified through Monte Carlo simulation with the MCNP program. This shielding provides performance over a dynamic range of eight orders of magnitude. System description, calibration issues and operational experiences are discussed.

  9. The method of executing the vibration tendency management of the intermittent driving equipment in the nuclear plant

    International Nuclear Information System (INIS)

    Yonekawa, Yutaka; Fukunaga, Tatsuya

    2008-01-01

    The main rotary machine is often an intermittent driving machine in the nuclear plant. On the other hand, it was a problem for the vibration method to detect the vibration when rotating, and very to achieve the vibration tendency management for the equipment that did not rotate though it positively worked on the introduction of the equipment diagnosis technology by the vibration method of the rotation equipment in the nuclear plant. This time, because the tendency management system of the intermittent driving equipment is developed, and the tendency management was achieved, it introduces the outline and an actual case. (author)

  10. Improving Product Performance Through New Equipment Training (NET) Techniques

    Science.gov (United States)

    2008-12-01

    communication equipment with gloves, acquire targets while wearing helmet and protective eyewear , and stealth movement to contact the enemy and...to be utilized in the literature review. We found that the industry and academic information we retrieved was relevant and transferable to the...chapter summarized industry and academic research relevant to enhancing Marines abilities to better notice and correctly utilize Infantry Combat

  11. Performance of Ultrafast DCE-MRI for Diagnosis of Prostate Cancer.

    Science.gov (United States)

    Chatterjee, Aritrick; He, Dianning; Fan, Xiaobing; Wang, Shiyang; Szasz, Teodora; Yousuf, Ambereen; Pineda, Federico; Antic, Tatjana; Mathew, Melvy; Karczmar, Gregory S; Oto, Aytekin

    2018-03-01

    This study aimed to test high temporal resolution dynamic contrast-enhanced (DCE) magnetic resonance imaging (MRI) for different zones of the prostate and evaluate its performance in the diagnosis of prostate cancer (PCa). Determine whether the addition of ultrafast DCE-MRI improves the performance of multiparametric MRI. Patients (n = 20) with pathologically confirmed PCa underwent preoperative 3T MRI with T2-weighted, diffusion-weighted, and high temporal resolution (~2.2 seconds) DCE-MRI using gadoterate meglumine (Guerbet, Bloomington, IN) without an endorectal coil. DCE-MRI data were analyzed by fitting signal intensity with an empirical mathematical model to obtain parameters: percent signal enhancement, enhancement rate (α), washout rate (β), initial enhancement slope, and enhancement start time along with apparent diffusion coefficient (ADC) and T2 values. Regions of interests were placed on sites of prostatectomy verified malignancy (n = 46) and normal tissue (n = 71) from different zones. Cancer (α = 6.45 ± 4.71 s -1 , β = 0.067 ± 0.042 s -1 , slope = 3.78 ± 1.90 s -1 ) showed significantly (P <.05) faster signal enhancement and washout rates than normal tissue (α = 3.0 ± 2.1 s -1 , β = 0.034 ± 0.050 s -1 , slope = 1.9 ± 1.4 s -1 ), but showed similar percentage signal enhancement and enhancement start time. Receiver operating characteristic analysis showed area under the curve for DCE parameters was comparable to ADC and T2 in the peripheral (DCE 0.67-0.82, ADC 0.80, T2 0.89) and transition zones (DCE 0.61-0.72, ADC 0.69, T2 0.75), but higher in the central zone (DCE 0.79-0.88, ADC 0.45, T2 0.45) and anterior fibromuscular stroma (DCE 0.86-0.89, ADC 0.35, T2 0.12). Importantly, combining DCE with ADC and T2 increased area under the curve by ~30%, further improving the diagnostic accuracy of PCa detection. Quantitative parameters from empirical mathematical model fits to ultrafast

  12. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  13. Development of a multi-functional platform to perform the I and C system test, diagnosis and training

    International Nuclear Information System (INIS)

    Ren Chunxiang; Guan Yunquan; Wang Xingye

    2014-01-01

    The Safety I and C system of Tianwan Nuclear Power Station (TNPS) is implemented with the Class lE digital I and C platform TELEPERM XS (TXS). To satisfy the requirements of TXS system fault diagnosis, spare parts performance test as well as the staff maintenance skill training, through the study of operating environment and configuration characteristics of the online TXS system, and adequately absorb the experiences of the digital control device test systems which are applied in both domestic and abroad, developed and established a set of TXS system multifunctional platform which performs the TXS software/hardware testing, fault diagnosis and staff maintenance skill training. Practice has proved that the platform running well to perform the test of the TXS system hardware and software, fault diagnosis and the training tasks to ensure the reliable operation of the online safety I and C system, and shorten the maintenance cycle of online TXS system, improved the technical level of the Operation and maintenance personnel, it provides a reference for similar I and C systems of other nuclear power plants. (authors)

  14. Wire Finishing Mill Rolling Bearing Fault Diagnosis Based on Feature Extraction and BP Neural Network

    Directory of Open Access Journals (Sweden)

    Hong-Yu LIU

    2014-10-01

    Full Text Available Rolling bearing is main part of rotary machine. It is frail section of rotary machine. Its running status affects entire mechanical equipment system performance directly. Vibration acceleration signals of the third finishing mill of Anshan Steel and Iron Group wire plant were collected in this paper. Fourier analysis, power spectrum analysis and wavelet transform were made on collected signals. Frequency domain feature extraction and wavelet transform feature extraction were made on collected signals. BP neural network fault diagnosis model was adopted. Frequency domain feature values and wavelet transform feature values were treated as neural network input values. Various typical fault models were treated as neural network output values. Corresponding relations between feature vector and fault omen were utilized. BP neural network model of typical wire plant finishing mill rolling bearing fault was constructed by training many groups sample data. After inputting sample needed to be diagnosed, wire plant finishing mill rolling bearing fault can be diagnosed. This research has important practical significance on enhancing rolling bearing fault diagnosis precision, repairing rolling bearing duly, decreasing stop time, enhancing equipment running efficiency and enhancing economic benefits.

  15. Fast diagnosis and treatment of cracklike defect injuriousness in PWR power plant equipment

    International Nuclear Information System (INIS)

    Benchimol, M.; Boneh, B.; Gilles, P.

    1983-08-01

    Defects detected in nuclear power plant components in the course of periodic inspections may have been formed during fabrication, at installation or in service. In order to accelerate decision-making subsequent to defect detection and increase the effectiveness of inspection programs, it is proposed in this paper that a package be prepared for each main system at the design stage to permit immediate diagnosis of defect injuriousness and to offer guidelines for mitigating action. The paper comprises: description of such a package, hereafter referred to as ''Defect Injuriousness Diagnosis and Treatment Package'' (DIDTP); breakdown of a DIDTP and demonstration of the computational methods used in its elaboration; presentation of the computer codes (ANODE, TITAN) used for automatic compilation of DIDTP's; example of DIDTP application

  16. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  17. Diagnosis of faults in EDF power plants: From monitoring to diagnosis

    International Nuclear Information System (INIS)

    Joussellin, A.; Chevalier, R.

    1994-01-01

    Electricite de France is constantly in search of means to improve safety and availability in its nuclear power plants. To this end, EDF has designed new monitoring systems for the major components of its units: for turbogenerator and inlet valves monitoring, for reactor coolant pumps monitoring, for internal structures monitoring and for loose parts detection. New techniques for signal acquisition and processing for diagnosis are used and all these monitoring systems are designed with the same general concept on monitoring. Simultaneously, a workstation for monitoring and aid in diagnosis (PSAD) is under development. It will integrate every monitoring system and will constitute an indispensable tool for plant personnel, enabling them to diagnose the condition of plant equipment, and providing them with high efficiency and user-friendly tools. The PSAD will have a flexible architecture, guaranteeing optimum distribution of computing power to make it available where it is needed

  18. Waste Handling Equipment Development Test and Evaluation Study

    International Nuclear Information System (INIS)

    R.L. Tome

    1998-01-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M and O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T and EP), Reference 5.1, was used as a basis for this study. The MGR T and EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T and EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T and EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  19. Experience with diagnosis of root causes of human performance problems in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Bhattacharya, A.S.

    1997-01-01

    Low capacity factor, in any NPP, is a result of high occurrence rates of significant events. A substantial portion of such occurrences is caused by inappropriate action due to inadequate human performance. To improve human performance we need first to do its evaluation. This paper describes the essential elements of the first basic step in that context: diagnosis or identification of the fundamental causes of human performance problems in Indian NPPs. (author)

  20. The impact of natural gas/hydrogen mixtures on the performance of end-use equipment : Interchangeability analysis for domestic appliances

    NARCIS (Netherlands)

    de Vries, Harmen; Mokhov, Anatoli V.; Levinsky, Howard B.

    2017-01-01

    The addition of hydrogen derived from renewable power to the natural gas network is being promoted as a viable means of storing excess wind and solar energy. However, the changes in combustion properties of the natural gas upon hydrogen addition can impact the performance of the end-use equipment

  1. ''PSAD'' on-line monitoring and aid to diagnosis workstation: a monitoring tool for EDF power plants

    International Nuclear Information System (INIS)

    Morel, J.; Mazalerat, J.M.; Monnier, B.; Cordier, R.

    1993-01-01

    Like other electricity utilities, Electricite de France seeks to enhance the safety and availability of its nuclear power plants. To this end, for over ten years EDF has been installing on each plant unit two monitoring systems of its own design, one to monitor the primary cooling system, and the other, the turbogenerator set. Since the beginning of this project, widespread progress has been made in techniques of signal acquisition and processing, and in diagnosis using artificial intelligence methods. EDF has decided to call on these advanced techniques in developing its new-generation monitoring equipment, and to integrate them in its development of a workstation for on-line monitoring and diagnosis-support (PSAD: Poste de Surveillance et d'Aide au Diagnostic). PSAD will be a tool for on-line monitoring of the main components in nuclear power plants (initially the main coolant pumps and turbogenerator sets, and soon thereafter, monitoring of internal structures, detection of loose parts in the primary cooling system, etc.). PSAD will provide plant personnel with indispensable support in their diagnosis of the condition of plant equipment. It will integrate user-friendly, high-performance systems that also free the operator from many day-to-day tasks. PSAD will have a flexible architecture, for optimum distribution of the computing power where it is most needed, thereby improving the quality of the data. This paper presents the project objectives and describes work currently under way to implement EDF's diagnosis-support strategy for the years to come. (authors). 5 figs., 6 refs

  2. Guide to optimized replacement of equipment seals

    International Nuclear Information System (INIS)

    Gleason, J.F.

    1990-03-01

    A reevaluation of current scheduled replacement intervals of polymeric seals in plant equipment can achieve significant benefits. Information is provided which has the potential for increasing replacement intervals based on better information on how seals have performed through unique nuclear industry tests to qualify equipment, improved elastomers and increased knowledge of the failure mechanisms and related performance. The research was performed by reviewing applications of elastomeric seals in nuclear plants and practice associated with defining seal replacement intervals in the nuclear power and other industries. Performance indicators and how they predict degradation of seals were evaluated. Guidelines and a flow chart for reevaluating seal replacement intervals are provided. 29 refs., 38 figs., 8 tabs

  3. Introduction of sample environment equipment for neutron scattering experiments

    International Nuclear Information System (INIS)

    Shimojo, Yutaka; Ihata, Yoshiaki; Kaneko, Koji; Takeda, Masayasu

    2013-02-01

    Neutron scattering experiments have been frequently performed under variety of sample conditions, such as various temperatures, pressures, magnetic fields and stresses, and those complex conditions to fully utilize superior properties of neutron. To this aim, a number of sample environment equipment, refrigerators, furnaces, pressure cells, superconducting magnets are equipped in JRR-3 to be used for experiments. In this document, all available sample environment equipment in both JRR-3 reactor and guide halls are summarized. We hope this document would help neutron scattering users to perform effective and excellent experiments. (author)

  4. Equipment for inspection of austenitic stainless steel pipe welds

    International Nuclear Information System (INIS)

    Boehmer, W.D.; Horn, J.E.

    1979-01-01

    A computer controlled ultrasonic scanning system and a data acquisition and analysis system have been developed to perform the inservice inspection of welds in stainless steel sodium piping in the Fast Flux Test Facility. The scanning equipment consists of a six axis motion mechanism and control system which allows full articulation of an ultrasonic transducer as it follows the circumferential pipe welds. The data acquisition and analysis system consists of high speed ultrasonic waveform digitizing equipment, dedicated processors to perform on-line analysis, and data storage and display equipment

  5. Maintenance of electronic equipment at the Saclay Nuclear Research Centre

    International Nuclear Information System (INIS)

    Chicheportiche, Armand; Raoult, Norbert.

    1975-06-01

    The Test-Repair Group of the Saclay Electronics Services ensures the maintenance of electronic equipment available to users of the Saclay site. The more and more frequent use of microelectronics in these instruments increases the electronic operator density and the working and data transmission sequences are becoming difficult to understand. This leads to complications in the adjustment, testing and repairs. Ways and means are studied to facilitate maintenance while reducing the immobilization time of the equipment and the repair costs. The Saclay Electronics Services have developed a method of systematic test sequence formulation and breakdown diagnosis based on the properties of binary analysis. This method is used by a supplier of the CEA which has built the corresponding test equipment. Owing to the test programmmes established for each component of an apparatus it is possible for example to locate a faulty element on a plan including more than 100 integrated circuits and to replace it in no more than 10 minutes [fr

  6. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  7. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  8. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  9. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  10. The current status of imaging diagnosis of breast cancer

    International Nuclear Information System (INIS)

    Liu Fang; Tang Guangcai

    2013-01-01

    In recent years, the incidence and the mortality rate of female breast cancer in our country is increasing, Early diagnosis of breast cancer is particularly important. Precious preoperative staging in the breast cancer is advantageous for the treatment planning. Evaluating the efficacy of chemotherapy is beneficial for adjusting the follow-up plan. Imaging examination has become an important role in breast cancer management. At present, commonly used equipment include mammography, ultrasound, CT, and MRI, etc. This article reviews the present study status of these tools in diagnosis of breast cancer. A reasonable and effective choice of those tools can facilitate clinic diagnosis and treatment. (authors)

  11. Evaluating performance characteristics of x-ray equipment and film systems without the use of electronic measurement and/or special instruments

    International Nuclear Information System (INIS)

    Bianchi, M.F.; DeNitto, C.; Liscio, A.; Scala, N.

    2004-01-01

    Measurement and control of characteristics of NDT equipment and system that produce output to be interpreted by inspector is one of the most important tools for NDT reliability. Control activity should be based on: initial accurate measurement and calibration; periodical check to assure maintenance of calibration status; and, immediate verification and corrective action when any malfunctioning is suspected. 'Self-calibration' intended as capability of NDT facility to calibrate and control its own equipment and systems is very important for continuous and reliable activity. Typical approach based on this philosophy is ASTM E317 'Standard Practice for Evaluating Performance Characteristics of Ultrasonic Pulse-Echo Examination Instruments and Systems Without the Use of Electronic Measurement Instruments' that is applicable to shop or field conditions. Is 'Self-calibration' applicable to radiographic system too? Many characteristics can be self-determined according to existing practices and methods, but other ones require assistance and cooperation of supplier both for film system and x-ray equipment. A certified film system being controlled by pre-exposed filmstrips can be adopted as 'measurement device' for X-ray output concerning both intensity and contrast. Basically x-ray equipment manufacturer performs initial accurate measurement and calibration using electronic measurement and/or special instrumentation as necessary. Then specific film set on 'low-price' blocks and specimens is produced according to standard practice whose guidelines are supplied by this paper. Film set, blocks, specimens and results referred to specific film system will be the reference kit for periodical check in NDT facility. This paper supplies some guidelines for standard practice based on testing using mainly GE Inspection Technologies radiographic system being available in Avio facilities. (author)

  12. Diagnosis-Related Groups (DRG and Hospital Business Performance Management

    Directory of Open Access Journals (Sweden)

    Szynkiewicz Piotr

    2014-12-01

    Full Text Available The goal of this article is to present the possibility of using Diagnosis- Related Groups (DRG in the hospital management process and to analyse the need for business performance management on the part of hospital management staff. The following research methods were used: literature analysis, case studies, and poll analysis. It is not possible to increase the effectiveness of operation of healthcare entities without increasing the importance of IT systems and using DRG more effectively in the management process. Training users in IT and the use of DRGs is important to achieving hospital effectiveness. The increased importance of analyses and planning in a hospital should be reflected in the organisational structure of service providers. Hospital controllers should have a similar role to those present in most companies in other industries.

  13. Diagnosis of faults in EDF power plants: from monitoring to diagnosis

    International Nuclear Information System (INIS)

    Joussellin, A.

    1994-06-01

    Electricite de France is constantly is search of means to improve safety and availability in its nuclear power plants. To this end, EDF has designed new monitoring systems for the major components of its units: for turbogenerator and inlet valves monitoring, for reactor coolant pumps monitoring, for internal structures monitoring and for loose parts detection. New techniques for signal acquisition and processing for diagnosis are used and all these monitoring systems are designed with the same general concept on monitoring. Simultaneously, a workstation for monitoring and aid in diagnosis (PSAD) is under development. It will integrate every monitoring system and will constitute an indispensable tool for plant personnel, enabling them to diagnose the condition of plant equipment, and providing them with high efficiency and user-friendly tools. The PSAD will have a flexible architecture, guaranteeing optimum distribution of computing power to make it available where it is needed. (author). 5 figs., 4 refs

  14. Adequate performance of cardiopulmonary resuscitation techniques during simulated cardiac arrest over and under protective equipment in football.

    Science.gov (United States)

    Waninger, Kevin N; Goodbred, Andrew; Vanic, Keith; Hauth, John; Onia, Joshua; Stoltzfus, Jill; Melanson, Scott

    2014-07-01

    To investigate (1) cardiopulmonary resuscitation (CPR) adequacy during simulated cardiac arrest of equipped football players and (2) whether protective football equipment impedes CPR performance measures. Exploratory crossover study performed on Laerdal SimMan 3 G interactive manikin simulator. Temple University/St Luke's University Health Network Regional Medical School Simulation Laboratory. Thirty BCLS-certified ATCs and 6 ACLS-certified emergency department technicians. Subjects were given standardized rescuer scenarios to perform three 2-minute sequences of compression-only CPR. Baseline CPR sequences were captured on each subject. Experimental conditions included 2-minute sequences of CPR either over protective football shoulder pads or under unlaced pads. Subjects were instructed to adhere to 2010 American Heart Association guidelines (initiation of compressions alone at 100/min to 51 mm). Dependent variables included average compression depth, average compression rate, percentage of time chest wall recoiled, and percentage of hands-on contact during compressions. Differences between subject groups were not found to be statistically significant, so groups were combined (n = 36) for analysis of CPR compression adequacy. Compression depth was deeper under shoulder pads than over (P = 0.02), with mean depths of 36.50 and 31.50 mm, respectively. No significant difference was found with compression rate or chest wall recoil. Chest compression depth is significantly decreased when performed over shoulder pads, while there is no apparent effect on rate or chest wall recoil. Although the clinical outcomes from our observed 15% difference in compression depth are uncertain, chest compression under the pads significantly increases the depth of compressions and more closely approaches American Heart Association guidelines for chest compression depth in cardiac arrest.

  15. Task Shifting and Skin Punch for the Histologic Diagnosis of Kaposi's Sarcoma in Sub-Saharan Africa: A Public Health Solution to a Public Health Problem.

    Science.gov (United States)

    Laker-Oketta, Miriam O; Wenger, Megan; Semeere, Aggrey; Castelnuovo, Barbara; Kambugu, Andrew; Lukande, Robert; Asirwa, F Chite; Busakhala, Naftali; Buziba, Nathan; Diero, Lameck; Wools-Kaloustian, Kara; Strother, Robert Matthew; Bwana, Mwebesa; Muyindike, Winnie; Amerson, Erin; Mbidde, Edward; Maurer, Toby; Martin, Jeffrey

    2015-01-01

    Fueled by HIV, sub-Saharan Africa has the highest incidence of Kaposi's sarcoma (KS) in the world. Despite this, KS diagnosis in the region is based mostly on clinical grounds. Where biopsy is available, it has traditionally been excisional and performed by surgeons, resulting in multiple appointments, follow-up visits for suture removal, and substantial costs. We hypothesized that a simpler approach - skin punch biopsy - would make histologic diagnosis more accessible. To address this, we provided training and equipment for skin punch biopsy of suspected KS to three HIV clinics in East Africa. The procedure consisted of local anesthesia followed by a disposable cylindrical punch blade to obtain specimens. Hemostasis is facilitated by Gelfoam®. Patients removed the dressing after 4 days. From 2007 to 2013, 2,799 biopsies were performed. Although originally targeted to be used by physicians, biopsies were performed predominantly by nurses (62%), followed by physicians (15%), clinical officers (12%) and technicians (11%). There were no reports of recurrent bleeding or infection. After minimal training and provision of inexpensive equipment (USD 3.06 per biopsy), HIV clinics in East Africa can integrate same-day skin punch biopsy for suspected KS. Task shifting from physician to non-physician greatly increases access. Skin punch biopsy should be part of any HIV clinic's essential procedures. This example of task shifting may also be applicable to the diagnosis of other cancers (e.g., breast) in resource-limited settings.

  16. Development and Manufacture of the Nuclear Laboratory Equipment

    International Nuclear Information System (INIS)

    Youm, Ki Un; Kim, J. K.; Kim, K. S.; Lee, I. B.; Youm, J. H.; Park, I. W.

    2008-12-01

    This report on development and manufacture of the nuclear laboratory equipment contains the work scope and contents performed for supporting the researches and the developments projects efficiently. And also, the records for the principal production design, the manufacture contents, the working drawings and the CNC program are described in it. Most of works are to support the successful and convenient performance of the R and D projects by development and manufacturing the requested laboratory equipment

  17. Development and Manufacture of the Nuclear Laboratory Equipment

    International Nuclear Information System (INIS)

    Youm, Ki Un; Moon, J. S.; Lee, I. B.; Youn, J. H.

    2010-12-01

    This report on development and manufacture of the nuclear laboratory equipment contains the work scope and contents performed for supporting the researches and the developments projects efficiently. And also, the records for the principal production design, the manufacture contents, the working drawings and the CNC program are described in it. Most of works are to support the successful and convenient performance of the R and D projects by development and manufacturing the requested laboratory equipment

  18. Development and Manufacture of the Nuclear laboratory equipment

    International Nuclear Information System (INIS)

    Youm, Ki Un; Lee, I. B.; Youm, J. H.

    2009-12-01

    This report on development and manufacture of the nuclear laboratory equipment contains the work scope and contents performed for supporting the researches and the developments projects efficiently. And also, the records for the principal production design, the manufacture contents, the working drawings and the CNC program are described in it. Most of works are to support the successful and convenient performance of the R and D projects by development and manufacturing the requested laboratory equipment

  19. A Case-Based Study with Radiologists Performing Diagnosis Tasks in Virtual Reality.

    Science.gov (United States)

    Venson, José Eduardo; Albiero Berni, Jean Carlo; Edmilson da Silva Maia, Carlos; Marques da Silva, Ana Maria; Cordeiro d'Ornellas, Marcos; Maciel, Anderson

    2017-01-01

    In radiology diagnosis, medical images are most often visualized slice by slice. At the same time, the visualization based on 3D volumetric rendering of the data is considered useful and has increased its field of application. In this work, we present a case-based study with 16 medical specialists to assess the diagnostic effectiveness of a Virtual Reality interface in fracture identification over 3D volumetric reconstructions. We developed a VR volume viewer compatible with both the Oculus Rift and handheld-based head mounted displays (HMDs). We then performed user experiments to validate the approach in a diagnosis environment. In addition, we assessed the subjects' perception of the 3D reconstruction quality, ease of interaction and ergonomics, and also the users opinion on how VR applications can be useful in healthcare. Among other results, we have found a high level of effectiveness of the VR interface in identifying superficial fractures on head CTs.

  20. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  1. General guidelines about performance specifications for purchasing equipment for x-ray diagnostics, with comments

    International Nuclear Information System (INIS)

    1995-12-01

    These general guidelines are intended to be used as a basis for what requirements are reasonable from a radiation protection point of view and should be part of the contract in connection with the purchase of equipment for x-ray diagnostics. Technical performance requirements are addressed as well as items like documentation, instructions for use and education and training. The guidelines are also useful for the design of quality assurance programs. In the comments in addition to these guidelines legal aspects are noted, including a list of relevant laws, regulations and directives. Standards, both national and international, within the field are referred to with a short description of their content. 40 refs

  2. General guidelines about performance specifications for purchasing equipment for x-ray diagnostics, with comments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    These general guidelines are intended to be used as a basis for what requirements are reasonable from a radiation protection point of view and should be part of the contract in connection with the purchase of equipment for x-ray diagnostics. Technical performance requirements are addressed as well as items like documentation, instructions for use and education and training. The guidelines are also useful for the design of quality assurance programs. In the comments in addition to these guidelines legal aspects are noted, including a list of relevant laws, regulations and directives. Standards, both national and international, within the field are referred to with a short description of their content. 40 refs.

  3. Research on Health State Perception Algorithm of Mining Equipment Based on Frequency Closeness

    Directory of Open Access Journals (Sweden)

    Gang Wang

    2014-06-01

    Full Text Available The health state perception of mining equipment is intended to have an online real- time knowledge and analysis of the running conditions of large mining equipments. Due to its unknown failure mode, a challenge was raised to the traditional fault diagnosis of mining equipments. A health state perception algorithm of mining equipment was introduced in this paper, and through continuous sampling of the machine vibration data, the time-series data set was set up; subsequently, the mode set based on the frequency closeness was constructed by the d neighborhood method combined with the TSDM algorithm, thus the forecast method on the basis of the dual mode set was eventually formed. In the calculation of the frequency closeness, the Goertzel algorithm was introduced to effectively decrease the computation amount. It was indicated through the simulation test on the vibration data of the drum shaft base that the health state of the device could be effectively distinguished. The algorithm has been successfully applied to equipment monitoring in the Huoer Xinhe Coal Mine of Shanxi Coal Imp&Exp. Group Co., Ltd.

  4. [Performance of Cholera-SMART and Pathogen-Detection-Kit in the quick diagnosis of cholera].

    Science.gov (United States)

    Bolaños, Hilda María; Acuña, María Teresa; Serrano, Ana María; Obando, Xinia; Mairena, Hazel; Cháves, Lorena; Sandí, Flor; Rodríguez, Gina; Tamplin, Mark L; Pérez, Enrique; Campos, Elena

    2004-10-01

    these samples, the direct SMART procedure showed a specificity of 100%, whereas the direct PDK procedure showed a specificity that ranged from 85.7% to 77.4%, depending on the type of sample. False positives obtained with the direct PDK method turned out to be negative with PDK-6 and PDK-18. Among the rectal and fecal swabs of persons with and without diarrhea or who had received prior treatment with antibiotics, three results that were negative with the SMART-6 procedure and two that were negative with the PDK-6 procedure turned out to be positive with the SMART-18 and PDK-18 procedures, respectively. Both systems showed excellent concordance (kappa index above 0.9) throughout. Both systems were sensitive to 6 x 10(7) colony-forming units per milliliter (cfu/mL), which was concordant with the microscopic observation of 10 microorganisms or more per field with the type of motility that characterizes vibrios (at 1000 x magnification). Samples having fewer than 10 microorganisms with the motility that characterizes vibrios had concentrations between 6 x 10(3) and 6 x 10(6) cfu/mL and became positive only after incubation in enriched-broth medium for 6 to 18 hours. We propose a strategy for diagnosing the presence of V. cholerae 01 infection in less time than it takes with traditional methods, with positive and negative predictive values of 100%. The SMART and PDK systems make it possible to accurately diagnose cholera quickly, don't require sophisticated equipment or highly qualified technical personnel, and perform satisfactorily in field conditions. Through the proposed strategy, it becomes possible to improve the specificity and sensitivity of these systems and to reduce the cost of making a diagnosis, thus making them suitable for use in cholera surveillance in low-income settings where this disease is a serious public health problem.

  5. Effects of variable loads on equipment and cogeneration cycles performance; Influencia da variacao da carga no rendimento de equipamentos e ciclos de co-geracao

    Energy Technology Data Exchange (ETDEWEB)

    Ernst, Mario A.B.; Balestieri, Jose A.P. [UNESP, Guaratingueta, SP (Brazil). Escola de Engenharia. Dept. de Engenharia Mecanica]. E-mails: basulto1@uol.com.br; basulto@feg.unesp.br; perella@feg.unesp.br

    2000-07-01

    This article presents some aspects relative to the effects of changing loads on steam.generators and turbines. When the equipment solicitation varies due to industrial process demand changes, the equipment work in off-design point, altering its efficiency and the specific fuel rate. This work do not look for a detailed and exhaustive determination of the performance variation with the load but shows that in the selection of equipment this variation can have effects over the consume and the costs. In the present article it is assumed that the load variations are known, and the effects on the equipment efficiency were took from the correlated literature. An example of a Rankine cycle and other of a Brayton cycle are discussed, altering the operational conditions estimating the operating cost for each case. (author)

  6. Distance and Density Similarity Based Enhanced k-NN Classifier for Improving Fault Diagnosis Performance of Bearings

    Directory of Open Access Journals (Sweden)

    Sharif Uddin

    2016-01-01

    Full Text Available An enhanced k-nearest neighbor (k-NN classification algorithm is presented, which uses a density based similarity measure in addition to a distance based similarity measure to improve the diagnostic performance in bearing fault diagnosis. Due to its use of distance based similarity measure alone, the classification accuracy of traditional k-NN deteriorates in case of overlapping samples and outliers and is highly susceptible to the neighborhood size, k. This study addresses these limitations by proposing the use of both distance and density based measures of similarity between training and test samples. The proposed k-NN classifier is used to enhance the diagnostic performance of a bearing fault diagnosis scheme, which classifies different fault conditions based upon hybrid feature vectors extracted from acoustic emission (AE signals. Experimental results demonstrate that the proposed scheme, which uses the enhanced k-NN classifier, yields better diagnostic performance and is more robust to variations in the neighborhood size, k.

  7. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    International Nuclear Information System (INIS)

    Gunther, W.E.; Higgins, J.C.; Aggarwal, S.K.

    1991-01-01

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance

  8. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    Energy Technology Data Exchange (ETDEWEB)

    Gunther, W.E.; Higgins, J.C. [Brookhaven National Lab., Upton, NY (United States); Aggarwal, S.K. [Nuclear Regulatory Commission, Washington, DC (United States)

    1991-12-31

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance.

  9. The effect of plant aging on equipment qualification and human performance issues related to license renewal

    Energy Technology Data Exchange (ETDEWEB)

    Gunther, W.E.; Higgins, J.C. (Brookhaven National Lab., Upton, NY (United States)); Aggarwal, S.K. (Nuclear Regulatory Commission, Washington, DC (United States))

    1991-01-01

    The aging of nuclear power plants is one of the most important issues facing the nuclear industry worldwide. Aging encompasses as forms of degradation to nuclear power plant components, systems, and structures that result from exposure to environmental conditions or from operational stresses. Both the degradation from aging and actions taken to address the aging, such as increased maintenance and testing, can significantly impact human performance in the plant. Research into the causes and effects of aging as obtained through the assessment of operating experience and testing have raised questions regarding the adequacy of existing industry standards for addressing the concerns raised by this research. This paper discusses these issues, with particular emphasis in the area of equipment qualification and human performance.

  10. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  11. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  12. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  13. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  14. Physical protection equipment study. Final report

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    This report summarizes the work performed by MITRE for the U.S. Nuclear Regulatory Commission. The major products of this effort are a Catalog of Physical Protection Equipment, a Guide for Evaluation of Physical Protection Equipment, a book of Reference Materials, and a set of guidelines for use in the development of a methodology for measuring levels of security system effectiveness. A summary of recommendations resulting from this study is also presented

  15. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  16. Development of ion/proton beam equipment for industrial uses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Byung Ho; Lee, J. H.; Cho, Y. S.; Joo, P. K.; Kang, S. S.; Song, W. S.; Kim, H. J.; Chang, G. H.; Bang, S. W

    1999-12-01

    KAERI has possessed design and fabrication technologies of various ion sources including Duoplasmatron and DuoPiGatron developed by R and D projects of the long-term nuclear technology development program. In order to industrialize ion beam equipments utilizing these ion sources, a technology transfer project for a technology transfer project for a domestic firm has been performed. Under this project, engineers of the firm have been trained through classroom lectures of ion beam principles and OJT, an ion/proton beam equipment (DEMO equipment) has been designed, assembled and commissioned jointly with the engineers. Quality of the ion sources has been quantified, and technologies for ion beam equipment construction, functional test and application research have been developed. The DEMO equipment, which consists of an ion source, power supplies, vacuum, cooling and target systems, has been fabricated and tested to secure stability and reliability for industrial uses. Various characteristic tests including high voltage insulation, beam extraction, beam current measuring, etc. have been performed. This DEMO can be utilized for ion sources development as well as ion beam process development for various industrial products. Engineers of the firm have been trained for the industrialization of ion beam equipment and joined in beam application technology development to create industrial needs of beam equipment. (author)

  17. Diagnostic performance of indirect MR arthrography for the diagnosis of rotator cuff tears at 3.0 T.

    Science.gov (United States)

    Lee, Ji Hyun; Yoon, Young Cheol; Jee, Sukkyung

    2015-06-01

    Indirect magnetic resonance (MR) arthrography is a non-invasive method for shoulder imaging. However, there are no studies that have examined the diagnostic performance of indirect MR arthrography for the diagnosis of rotator cuff tears in a large patient population. To assess the diagnostic performance of indirect fast spin-echo (FSE) MR arthrography for the diagnosis of rotator cuff tears at 3.0 T. A total of 149 patients who had undergone indirect shoulder MR arthrography followed by arthroscopic surgery were enrolled in this retrospective study. Two musculoskeletal radiologists evaluated images from each patient for the presence of supraspinatus-infraspinatus (SSP-ISP) or subscapularis (SSC) tendon tears. Using the arthroscopic findings as the reference standard, the overall diagnostic performance and detection rates for SSP-ISP and SSC tendon tears were calculated. The sensitivity, specificity, and accuracy of readers I and II for the diagnosis of SSP-ISP tendon tears were 94% and 95%, 89% and 85%, and 93% and 93%, respectively. The sensitivity of imaging for detection of SSP-ISP tendon tears by readers I and II were 100% and 100% for full-thickness tears and 84% and 86% for partial-thickness tears, respectively. The sensitivity, specificity, and accuracy of readers I and II for the diagnosis of SSC tendon tears were 80% and 76%, 89% and 93%, and 85% and 85%, respectively. Indirect MR arthrography is useful for the detection of SSP-ISP and SSC tendon tears. © The Foundation Acta Radiologica 2014 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  18. Research and design of distributed intelligence fault diagnosis system in nuclear power plant

    International Nuclear Information System (INIS)

    Liu Yongkuo; Xie Chunli; Cheng Shouyu; Xia Hong

    2011-01-01

    In order to further reduce the misoperation after the faults occurring of nuclear power plant, according to the function distribution of nuclear power equipment and the distributed control features of digital instrument control system, a nuclear power plant distributed condition monitoring and fault diagnosis system was researched and designed. Based on decomposition-integrated diagnostic thinking, a fuzzy neural network and RBF neural network was presented to do the distributed local diagnosis and multi-source information fusion technology for the global integrated diagnosis. Simulation results show that the developed distributed status monitoring and fault diagnosis system can diagnose more typical accidents of PWR to provide effective diagnosis and operation information. (authors)

  19. Visualizing request-flow comparison to aid performance diagnosis in distributed systems.

    Science.gov (United States)

    Sambasivan, Raja R; Shafer, Ilari; Mazurek, Michelle L; Ganger, Gregory R

    2013-12-01

    Distributed systems are complex to develop and administer, and performance problem diagnosis is particularly challenging. When performance degrades, the problem might be in any of the system's many components or could be a result of poor interactions among them. Recent research efforts have created tools that automatically localize the problem to a small number of potential culprits, but research is needed to understand what visualization techniques work best for helping distributed systems developers understand and explore their results. This paper compares the relative merits of three well-known visualization approaches (side-by-side, diff, and animation) in the context of presenting the results of one proven automated localization technique called request-flow comparison. Via a 26-person user study, which included real distributed systems developers, we identify the unique benefits that each approach provides for different problem types and usage modes.

  20. Study on Fault Diagnosis of Rolling Bearing Based on Time-Frequency Generalized Dimension

    Directory of Open Access Journals (Sweden)

    Yu Yuan

    2015-01-01

    Full Text Available The condition monitoring technology and fault diagnosis technology of mechanical equipment played an important role in the modern engineering. Rolling bearing is the most common component of mechanical equipment which sustains and transfers the load. Therefore, fault diagnosis of rolling bearings has great significance. Fractal theory provides an effective method to describe the complexity and irregularity of the vibration signals of rolling bearings. In this paper a novel multifractal fault diagnosis approach based on time-frequency domain signals was proposed. The method and numerical algorithm of Multi-fractal analysis in time-frequency domain were provided. According to grid type J and order parameter q in algorithm, the value range of J and the cut-off condition of q were optimized based on the effect on the dimension calculation. Simulation experiments demonstrated that the effective signal identification could be complete by multifractal method in time-frequency domain, which is related to the factors such as signal energy and distribution. And the further fault diagnosis experiments of bearings showed that the multifractal method in time-frequency domain can complete the fault diagnosis, such as the fault judgment and fault types. And the fault detection can be done in the early stage of fault. Therefore, the multifractal method in time-frequency domain used in fault diagnosis of bearing is a practicable method.

  1. Los Alamos Controlled Air Incinerator for radioactive waste. Volume I. Rationale, process, equipment, performance, and recommendations

    International Nuclear Information System (INIS)

    Neuls, A.S.; Draper, W.E.; Koenig, R.A.; Newmyer, J.M.; Warner, C.L.

    1982-08-01

    This two-volume report is a detailed design and operating documentation of the Los Alamos National Laboratory Controlled Air Incinerator (CAI) and is an aid to technology transfer to other Department of Energy contractor sites and the commercial sector. Volume I describes the CAI process, equipment, and performance, and it recommends modifications based on Los Alamos experience. It provides the necessary information for conceptual design and feasibility studies. Volume II provides descriptive engineering information such as drawing, specifications, calculations, and costs. It aids duplication of the process at other facilities

  2. Los Alamos Controlled Air Incinerator for radioactive waste. Volume I. Rationale, process, equipment, performance, and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Neuls, A.S.; Draper, W.E.; Koenig, R.A.; Newmyer, J.M.; Warner, C.L.

    1982-08-01

    This two-volume report is a detailed design and operating documentation of the Los Alamos National Laboratory Controlled Air Incinerator (CAI) and is an aid to technology transfer to other Department of Energy contractor sites and the commercial sector. Volume I describes the CAI process, equipment, and performance, and it recommends modifications based on Los Alamos experience. It provides the necessary information for conceptual design and feasibility studies. Volume II provides descriptive engineering information such as drawing, specifications, calculations, and costs. It aids duplication of the process at other facilities.

  3. Seizing market shaping opportunities for vaccine cold chain equipment.

    Science.gov (United States)

    Azimi, Tara; Franzel, Lauren; Probst, Nina

    2017-04-19

    Gavi, the Vaccine Alliance, supports immunisation programmes in eligible countries to reach children with lifesaving vaccines. Dramatic improvement in the scale and performance of current cold chain systems is required to extend the reach of immunisation services - especially for children living in remote locations - to advance progress towards full vaccine coverage. Achieving these improvements will require a healthier market for cold chain equipment where the products meet user needs, are sustainably priced, and are available in sufficient quantities to meet demand. Yet evidence suggests that the cold chain market has suffered from several failures including limited demand visibility, fragmented procurement, and insufficient information exchange between manufacturers and buyers on needs and equipment performance. One of Gavi's strategic goals is to shape markets for vaccines and other immunisation products, including cold chain equipment and in 2015, Gavi created a new mechanism - the Cold Chain Equipment (CCE) Optimisation Platform - to strengthen country cold chain systems by offering financial support and incentives for higher performing CCE. The main objective of the CCE Platform is to get more equipment that is efficient, sustainable, and better performing deployed to every health facility where it is required at an affordable price. To achieve these objectives, Gavi is putting in place tested market shaping approaches and tools adapted for the CCE market: the development of market strategies or 'roadmaps'; improvement of product performance through the development of target product profiles (TPPs); strategic engagement with CCE manufacturers and countries to enhance information sharing; and tailoring procurement tactics to the CCE market. These approaches and tools will allow for increased demand and supply of higher-performing, cost-effective and quality products. By strengthening immunisation systems with improved cold chain equipment, Gavi countries can

  4. Records Management Handbook; Source Data Automation Equipment Guide.

    Science.gov (United States)

    National Archives and Records Service (GSA), Washington, DC. Office of Records Management.

    A detailed guide to selecting appropriate source data automation equipment is presented. Source data automation equipment is used to prepare data for electronic data processing or computerized recordkeeping. The guide contains specifications, performance data cost, and pictures of the major types of machines used in source data automation.…

  5. Advances in the diagnosis of substations primary equipment by means of high sensitivity techniques; Avances en el diagnostico de equipo primario de subestaciones mediante tecnicas de alta sensibilidad

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Colon H, V. Rodolfo; Nava G, J. Armando; Azcarraga R, Carlos G [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2005-07-01

    In an electrical system, the substations primary equipment is integrated by the power transformers, the instrument transformers, the breakers and the interconnection circuits (energy cables). At the present time, the described primary equipment has been integrated in an arrangement denominated encapsulated substation that presents dimensional and aesthetic advantages in the conventional substations. Nevertheless, the isolation involved in this type of substations means new challenges when carrying out its diagnosis in a planned way or after the appearance of a fault. In this sense, the insulating and electromechanical system of the primary equipment of substations must be evaluated in a programmed way or be constantly monitored. This with the final purpose of detecting incipient problems that could evolve towards a fault or to the diminution of the electrical system reliability. [Spanish] En un sistema electrico, el equipo primario de subestaciones esta integrado por los transformadores de potencia, los transformadores de instrumento, los interruptores y los circuitos de interconexion (cables de energia). En la actualidad, el equipo primario descrito se ha integrado en un arreglo denominado subestacion encapsulada que presenta ventajas dimensionales y esteticas sobre las subestaciones convencionales. Sin embargo, el aislamiento involucrado en este tipo de subestaciones significa nuevos retos al efectuar su diagnostico de manera planeada o despues de presentarse una falla. En este sentido, el sistema aislante y electromecanico del equipo primario de subestaciones debe ser evaluado de manera programada o monitoreado constantemente. Ello con la finalidad de detectar problemas incipientes que pudieran evolucionar hacia una falla o la disminucion de la confiabilidad del sistema electrico.

  6. Establishing a laboratory network of influenza diagnosis in Indonesia: an experience from the avian flu (H5N1 outbreak

    Directory of Open Access Journals (Sweden)

    Setiawaty V

    2012-08-01

    Full Text Available Vivi Setiawaty, Krisna NA Pangesti, Ondri D SampurnoNational Institute of Health Research and Development, Ministry of Health, the Republic of Indonesia, Jakarta, IndonesiaAbstract: Indonesia has been part of the global influenza surveillance since the establishment of a National Influenza Center (NIC at the National Institute of Health Research and Development (NIHRD by the Indonesian Ministry of Health in 1975. When the outbreak of avian influenza A (H5N1 occurred, the NIC and US Naval Medical Research Unit 2 were the only diagnostic laboratories equipped for etiology confirmation. The large geographical area of the Republic of Indonesia poses a real challenge to provide prompt and accurate diagnosis nationally. This was the main reason to establish a laboratory network for H5N1 diagnosis in Indonesia. Currently, 44 laboratories have been included in the network capable of performing polymerase chain reaction testing for influenza A. Diagnostic equipment and standard procedures of biosafety and biosecurity of handling specimens have been adopted largely from World Health Organization recommendations.Keywords: influenza, laboratory, networking

  7. EMR Measurements on NDA Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Macdonell, Alexander Thomas [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meierbachtol, Krista Cruse [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Evans, James Walter Jr. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Mayo, Douglas R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-10

    Electromagnetic radiation (EMR) emission strength measurements were performed on a suite of passive non-destructive assay (NDA) radiation detection equipment. Data were collected from 9 kHz up to 6 GHz on each of the assembled systems.

  8. The application and practice of predictive maintenance at CANDU equipment management

    International Nuclear Information System (INIS)

    Yu Guangting

    2014-01-01

    The equipment in Qinshan CANDU unit is characterized by large number and complex structure. Some equipment failure has no relation with the operation time, it is impossible to avoid the failure of these equipment only by periodical maintenance. To improve the equipment reliability, increase the equipment usability and decrease the maintenance cost, for important equipment related to nuclear safety and generating electricity, it is required to perform condition monitoring and the predictive maintenance (PdM). According to different characteristics of equipment, it is required to use suitable equipment condition monitoring method, content and frequency. In this way, some potential equipment failure can be found, preventive maintenance can be arranged in advance, and equipment maintenance management can be optimized. (author)

  9. Methods and equipment for diagnosis of components of Novovoronezh nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Prokop, K [Energoinvest, Dukovany (Czechoslovakia). Zavod Jaderna Elektrarna

    1981-12-01

    The results are reported obtained in applying diagnostic techniques adn diagnostic equipment in the Novovoronezh nuclear power plant. Vibroacoustic, neutron and hydrodynamic noiose of the installation was monitored. The test level method and the mean value comparison method were used for assessing the installation condition. Dispersion analysis methods are used for predicting the propagation of anomalies while for determining specific defects leading to the formation of anomalies the method is used based on the correlation analysis of vibroacoustic signals and other technological noise. The flow charts and descriptions are given of the systems of acoustic emission testing, reactor internals testing using neutron noise, pump testing, and the spectral analyzer.

  10. TDRSS S-shuttle unique receiver equipment

    Science.gov (United States)

    Weinberg, A.; Schwartz, J. J.; Spearing, R.

    1985-01-01

    Beginning with STS-9, the Tracking and Date Relay Satellite system (TDRSS) will start providing S- and Ku-band communications and tracking support to the Space Shuttle and its payloads. The most significant element of this support takes place at the TDRSS White Sands Ground Terminal, which processes the Shuttle return link S- and Ku-band signals. While Ku-band hardware available to other TDRSS users is also applied to Ku-Shuttle, stringent S-Shuttle link margins have precluded the application of the standard TDRSS S-band processing equipment to S-Shuttle. It was therfore found necessary to develop a unique S-Shuttle Receiver that embodies state-of-the-art digital technology and processing techniques. This receiver, developed by Motorola, Inc., enhances link margins by 1.5 dB relative to the standard S-band equipment and its bit error rate performance is within a few tenths of a dB of theory. An overview description of the Space Shuttle Receiver Equipment (SSRE) is presented which includes the presentation of block diagrams and salient design features. Selected, measured performance results are also presented.

  11. Study and survey of assembling parameters to a radioactive source production laboratory used to verify equipment

    International Nuclear Information System (INIS)

    Gauglitz, Erica

    2010-01-01

    This paper presents a survey of parameters for the proper and safe flooring, doors, windows, fume hoods and others, in a radiochemical laboratory. The layout of each item follows guidelines and national standards of the National Commission of Nuclear Energy (CNEN) and the International Atomic Energy Agency (IAEA), aiming to ensure the radiological protection of workers and environment. The adequate items arrangement in the radiochemical laboratory ensures quality and safety in the production of 57 Co 137 Cs and 133 Ba radioactive sealed sources, with activities 185, 9.3 and 5.4 MBq, respectively. These sources are used to verify meter activity equipment and should be available throughout the Nuclear Medicine Center, following the recommendations of CNEN-NN-3.05 standard R equirements for Radiation Protection and Safety Services for Nuclear Medicine , to verify the activity of radiopharmaceuticals that are administered in patients, for diagnosis and therapy. Verification of measuring activity equipment will be used to perform accuracy, reproducibility and linearity tests, which should show results within the limits specified in the standard CNEN-NN-3.05. (author)

  12. Element nodes of sports equipment double back flip factions and double back flip hunched performed gymnast in floor exercise

    Directory of Open Access Journals (Sweden)

    V.A. Potop

    2014-07-01

    Full Text Available Purpose: to identify the node elements of sports equipment double back somersault tuck and double back flip bent. To compare the two types of nodes for double somersault. Material : the study involved eight gymnasts (age 12 - 14 years. All finalists in the competition floor exercise - reserve team Romania. The method of video - computer research and method of postural orientation movements. Results : identified nodal elements of sports equipment double back somersault tuck and double back flip bent. In the preparatory phase of motor actions - launcher body posture for reaching is repulsive to flip. In the phase of basic motor action - animation body postures (double back somersault tuck and bent (bent double back flip. Exercises are performed on the ascending and descending parts of the flight path of the demonstration of individual maximum lift height common center of mass. In the final phase of motor actions - final body posture - steady landing. Conclusions : indicators of key elements of sports equipment acrobatic exercises contain new scientific facts kinematic and dynamic structures of motor actions. They are necessary for the development of modern training programs acrobatic exercises in step specialized base preparation.

  13. Wind Turbine Diagnosis under Variable Speed Conditions Using a Single Sensor Based on the Synchrosqueezing Transform Method.

    Science.gov (United States)

    Guo, Yanjie; Chen, Xuefeng; Wang, Shibin; Sun, Ruobin; Zhao, Zhibin

    2017-05-18

    The gearbox is one of the key components in wind turbines. Gearbox fault signals are usually nonstationary and highly contaminated with noise. The presence of amplitude-modulated and frequency-modulated (AM-FM) characteristics compound the difficulty of precise fault diagnosis of wind turbines, therefore, it is crucial to develop an effective fault diagnosis method for such equipment. This paper presents an improved diagnosis method for wind turbines via the combination of synchrosqueezing transform and local mean decomposition. Compared to the conventional time-frequency analysis techniques, the improved method which is performed in non-real-time can effectively reduce the noise pollution of the signals and preserve the signal characteristics, and hence is suitable for the analysis of nonstationary signals with high noise. This method is further validated by simulated signals and practical vibration data measured from a 1.5 MW wind turbine. The results confirm that the proposed method can simultaneously control the noise and increase the accuracy of time-frequency representation.

  14. Development of distributed plant monitoring and diagnosis system at Monju

    International Nuclear Information System (INIS)

    Okusa, Kyoichi; Tamayama, Kiyoshi; Kitamura, Tomomi

    2003-01-01

    In a nuclear plant, it is required to detect an anomaly as early as possible and to inhibit adverse consequences. This requirement is especially important for a prototype Fast Breeder Reactor Monju. Therefore, a monitoring and diagnosis system is required to be developed for Monju plant equipments. In these days, such a monitoring and diagnosis system can be realized using Web technology with rationalized system resources due to the remarkable progress of computer network technology. Then, we developed a Web based platform for the monitoring and diagnosis system of Monju. Distributed architecture, standardization and highly flexible system structure have been taken account of in the development. This newly developed platform and prototype monitoring and diagnosis systems have been validated. Prototype monitoring and diagnosis systems on the platform acquire Monju plant data and display the data on client computers using Monju intranet with acceptable delay times. The prototype monitoring and diagnosis systems for Monju have been developed on the platform and the whole system has been validated. (author)

  15. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  16. Development of remote automatic equipment for BWR power plants

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi

    1984-01-01

    The development of remote control, automatic equipment for nuclear power stations has been promoted to raise the rate of operation of plants by shortening regular inspection period, to improve the safety and reliability of inspection and maintenance works by mechanization, to reduce the radiation exposure dose of workers and to reduce the manpower required for works. The taking-off of control rod drives from reactors and fixing again have been mechanized, but the disassembling, cleaning, inspection and assembling of control rod drives are manually carried out. Therefore, Hitachi Ltd. has exerted effort to develop the automatic equipment for this purpose. The target of development, investigation, the construction and function of the equipment, the performance and the effect of adopting it are reported. The equipment for the volume reduction of spent fuel channel boxes and spent control rods is developed since these are major high level radioactive solid wastes, and their apparent volume is large. Also the target of development, investigated things, the construction and function of the equipment, the performance and the effect of adopting it are reported. (Kako, I.)

  17. Experience in the manufacture of nuclear equipment in India

    International Nuclear Information System (INIS)

    Challappa, S.; Murthy, G.S.K.; Mehta, S.K.; Kakodkar, A.; Natarajan, A.

    1977-01-01

    Department of Atomic Energy with its programme for achieving self-sufficiency was involved in engineering, manufacture, inspection, performance testing and quality surveillance of major precision and critical equipment such as reactor vessels, shields, fuelling machines, coolant channel components etc. etc. high pressure equipment for Heavy Water Plants, specialized components for Fuel Complex, major equipment for Cyclotron Project and various research projects. These had to be manufactured at various shops in the country depending upon the availability of machines. The relative importance of various important parameters associated with the manufacture of this equipment were assessed in a separate R and D programme. This has helped in re-designing in some areas to suit the manufacture under Indian conditions. Assessment of any marginal variations that take place during manufacture was also possible because of the availability of data of this kind. Critical components and equipment are tested for their performance under simulated conditions before shipments. B.A.R.C. has contributed immensely in achieving the self-sufficiency and also for designs for future plants

  18. Study on the shipboard radar reconnaissance equipment azimuth benchmark method

    Science.gov (United States)

    Liu, Zhenxing; Jiang, Ning; Ma, Qian; Liu, Songtao; Wang, Longtao

    2015-10-01

    The future naval battle will take place in a complex electromagnetic environment. Therefore, seizing the electromagnetic superiority has become the major actions of the navy. Radar reconnaissance equipment is an important part of the system to obtain and master battlefield electromagnetic radiation source information. Azimuth measurement function is one of the main function radar reconnaissance equipments. Whether the accuracy of direction finding meets the requirements, determines the vessels successful or not active jamming, passive jamming, guided missile attack and other combat missions, having a direct bearing on the vessels combat capabilities . How to test the performance of radar reconnaissance equipment, while affecting the task as little as possible is a problem. This paper, based on radar signal simulator and GPS positioning equipment, researches and experiments on one new method, which povides the azimuth benchmark required by the direction-finding precision test anytime anywhere, for the ships at jetty to test radar reconnaissance equipment performance in direction-finding. It provides a powerful means for the naval radar reconnaissance equipments daily maintenance and repair work[1].

  19. [Performance of prenatal diagnosis and postnatal development of congenital lung malformations].

    Science.gov (United States)

    Desseauve, D; Dugué-Marechaud, M; Maurin, S; Gatibelza, M-È; Vequeau-Goua, V; Mergy-Laurent, M; Levard, G; Pierre, F

    2015-04-01

    For many diseases, the comparison of prenatal diagnosis with a histopathological reality is not always possible. Fetal lung pathology, with its high rate of surgery in postnatal, allows this assessment. This study proposes an approach to the reliability of prenatal diagnosis and analysis of the postnatal development of all children in care for congenital pulmonary malformation (CPM). This is a retrospective study of all cases of CPM diagnosed in Poitiers University Hospital from 1995 to 2011. Cases diagnosed prenatally were identified and the diagnostic accuracy was studied by histology when cases had surgery. The postnatal development of prenatally diagnosed cases is described and compared to children who did not receive prenatal diagnosis. Among the 45 cases of CPM supported at the Poitiers University Hospital, 30 had received prenatal diagnosis of isolated CPM. The diagnostic concordance between antenatal ultrasound and the final diagnosis is κ=0.67 (CI95% [0.38 to 0.94]). The sensitivity of ultrasound was 90% (CI95% [55-99.7]) in our series for the diagnosis of CAMP (cystic adenomatoid malformation pulmonary). We found a sonographic disappearance of lesions in 4 children, 1 child in regression, stable lesions in 21 cases. Four children showed an increase in volume of the malformation, with signs of poor tolerance in 3 cases. After birth, children who received a prenatal diagnosis were no more symptomatic than those whose diagnosis was made postnatal: 21 (70%) versus 11 (73%; P=1) respectively. Similarly, they often received prophylactic surgery: 18 (60%) versus 2 (13%) respectively (P<0.01) and less often suffered post-surgery complication: 3 (10%) versus 10 (67%) respectively (P<0.01). The number of children monitored was not significantly different in the two groups. Prenatal diagnosis allows for the precise nature of the lesion in 90% of cases in 2013 and had no impact on symptomatology at birth. When prenatal diagnosis is possible, preventive

  20. Quality assurance applied to mammographic equipments using phantoms and software for its evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Mayo, Patricia, E-mail: p.mayo@titaniast.co [Titania Servicios Tecnologicos S.L., Grupo Dominguis, Apartado 46015, Valencia (Spain); Rodenas, Francisco [Departamento de Matematica Aplicada, Universidad Politecnica de Valencia, Apartado 46022, Valencia (Spain); Manuel Campayo, Juan [Hospital Clinico Universitario de Valencia, Avda. Blasco Ibanez, Apartado 46017, Valencia (Spain); Verdu, Gumersido [Departamento de Ingenieria Quimica y Nuclear, Universidad Politecnica de Valencia, Apartado 46022, Valencia (Spain)

    2010-07-21

    The image quality assessment in radiographic equipments is a very important item for a complete quality control of the radiographic image chain. The periodic evaluation of the radiographic image quality must guarantee the constancy of this quality to carry out a suitable diagnosis. Mammographic phantom images are usually used to study the quality of images obtained by determined mammographic equipment. The digital image treatment techniques allow to carry out an automatic analysis of the phantom image. In this work we apply some techniques of digital image processing to analyze in an automatic way the image quality of mammographic phantoms, namely CIRS SP01 and RACON for different varying conditions of the mammographic equipment. The CIRS SP01 phantom is usually used in analogic mammographic equipments and the RACON phantom has been specifically developed by authors to be applied to acceptance and constancy tests of the image quality in digital radiographic equipments following recommendations of international associations. The purpose of this work consists in analyzing the image quality for both phantoms by means of an automatic software utility. This analysis allows us to study the functioning of the image chain of the mammographic system in an objective way, so an abnormal functioning of the radiographic equipment might be detected.

  1. Quality assurance applied to mammographic equipments using phantoms and software for its evaluation

    International Nuclear Information System (INIS)

    Mayo, Patricia; Rodenas, Francisco; Manuel Campayo, Juan; Verdu, Gumersido

    2010-01-01

    The image quality assessment in radiographic equipments is a very important item for a complete quality control of the radiographic image chain. The periodic evaluation of the radiographic image quality must guarantee the constancy of this quality to carry out a suitable diagnosis. Mammographic phantom images are usually used to study the quality of images obtained by determined mammographic equipment. The digital image treatment techniques allow to carry out an automatic analysis of the phantom image. In this work we apply some techniques of digital image processing to analyze in an automatic way the image quality of mammographic phantoms, namely CIRS SP01 and RACON for different varying conditions of the mammographic equipment. The CIRS SP01 phantom is usually used in analogic mammographic equipments and the RACON phantom has been specifically developed by authors to be applied to acceptance and constancy tests of the image quality in digital radiographic equipments following recommendations of international associations. The purpose of this work consists in analyzing the image quality for both phantoms by means of an automatic software utility. This analysis allows us to study the functioning of the image chain of the mammographic system in an objective way, so an abnormal functioning of the radiographic equipment might be detected.

  2. Monitoring and diagnosis of condensation systems in thermoelectric power stations: behavior indicators; Monitoreo y diagnostico de sistemas de condensacion en centrales termoelectricas: indicadores de comportamiento

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez Martinez, Hugo; Sanchez Sanchez, Ramon [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2009-07-01

    In this article are described the basic characteristics, capacities and benefits of a computer system for the monitoring and operation diagnosis of the main equipment of a condensation system of thermoelectric power plants. The system monitors the process variables in real time and, with base in these variables, it can realize a diagnosis of the cooling tower, the condenser, the circulation water and the circulating water pumps, deducting the possible problems (deficiency causes) and raising alternatives to improve the system performance or to solve the problem. It is important to mention that with base in the raised alternatives, the user can take decisions to diminish or eliminate the problem. The essential content of the article focuses in the description of the basic procedures for the calculation of the performance and diagnosis indicators of the condensation system of the equipment. The equipment evaluation is carried out by means of the comparison between the indicators values and the expected ones, whereas the diagnosis is realized by means of an expert system. [Spanish] En este articulo se describen las caracteristicas principales, capacidades y beneficios de un sistema computacional para el monitoreo y diagnostico del funcionamiento de los equipos principales de un sistema de condensacion de plantas termoelectricas. El sistema monitorea las variables del proceso en tiempo real y, con base en dichas variables, puede realizar un diagnostico de la torre de enfriamiento, el condensador y las bombas de agua de circulacion, deduciendo los posibles problemas (causas de las deficiencias) y planteando alternativas para mejorar el desempeno del sistema o solucionar el problema. Es importante mencionar que con base en las alternativas planteadas, el usuario puede tomar decisiones para reducir o eliminar el problema. El contenido esencial del articulo se enfoca en la descripcion de los procedimientos basicos para el calculo de los indicadores de desempeno y

  3. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  4. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  5. Performance evaluation of the quarter-scale Russian retrieval equipment for the removal of hazardous waste

    International Nuclear Information System (INIS)

    Enderlin, C.W.; Mullen, O.D.; Terrones, G.

    1997-09-01

    This report describes the test program for evaluating the Russian Retrieval Equipment fabricated by the Integrated Mining Chemical Company (IMCC) and delivered to the US by Radiochem Services Company (RCSC), both of Russia. The testing and fabrication of this equipment were sponsored by the US Department of Energy (DOE). The tests described in this report were conducted at the Pacific Northwest National Laboratory (PNNL) at the DOE Hanford Site by the Retrieval Process Development and Enhancement (RPD and E) team of the Tank Focus Area program (TFA). Tests were carried out jointly by Russian and US personnel for the purpose of evaluating the Russian Retrieval Equipment for potential deployment within the DOE complex. Section 1.0 of this report presents the objectives and a brief background for the test program. The Russian Equipment is described in Section 2.0. Section 3.0 describes the approach taken for testing the equipment. The results of the tests and an analysis of the data are described in Section 4.0. The results and observations obtained from the tests are discussed in Section 5.0. Recommendations and conclusions are presented in Section 6.0

  6. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  7. A novel mechanical design of broken rope protection device for enhancing the safety performances of overhead manned equipment in coal mine

    Directory of Open Access Journals (Sweden)

    Xiaoguang Zhang

    2015-08-01

    Full Text Available A novel mechanical design of the broken rope protection device is proposed to enhance the safety performances of the overhead manned equipment. According to the operating characteristics and functional requirements of the overhead manned equipment, a three-dimensional mechanical model of the broken rope protection device was redesigned. Based on the known parameters of the mechanical model, the stress and strength of the main components are readjusted using the statics characteristics of finite element analysis. To ensure the reliability of the control system of the broken rope protection device, the process of people’s falling, the response performance of the tension sensor, and the signal extraction of the broken rope are analyzed under different loading and unloading speeds. The working principle of the broken rope protection device is expounded in detail. The experimental results showed that better effect is obtained by the new broken rope protection device, which is characterized by good durability, low investment, and high reliability.

  8. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  9. Reconciliation of equipment flexibility effects on piping system dynamic response

    International Nuclear Information System (INIS)

    Geraets, L.H.

    1987-01-01

    Piping systems are connected to equipment; if the equipment cannot be considered as ''rigid'' relative to excitation frequencies, nozzle response spectra techniques, or equipment modeling techniques are used. If the equipment is considered rigid, a fixed anchor is assumed. However, occasionally after (seismic) dynamic analysis has been completed, tests or detailed equipment dynamic analyses demonstrate that the assumption of ''infinite stiff'' is questionable. This paper reviews several classes of equipment (pumps, vessels, reservoirs, heat exchangers), and the associated (piping stresses, support loads, equipment nozzle allowables). Significant divergences between design and ''as built'' results are shown (for heat exchangers in particular). The paper discusses the reconciliation process performed for a belgian PWR plant through the use of less conservative seismic damping data (Code Case N-411)

  10. Performance of automated multiplex PCR using sonication fluid for diagnosis of periprosthetic joint infection: a prospective cohort.

    Science.gov (United States)

    Renz, Nora; Feihl, Susanne; Cabric, Sabrina; Trampuz, Andrej

    2017-12-01

    Sonication of explanted prostheses improved the microbiological diagnosis of periprosthetic joint infections (PJI). We evaluated the performance of automated multiplex polymerase chain reaction (PCR) using sonication fluid for the microbiological diagnosis of PJI. In a prospective cohort using uniform definition criteria for PJI, explanted joint prostheses were investigated by sonication and the resulting sonication fluid was analyzed by culture and multiplex PCR. McNemar's Chi-squared test was used to compare the performance of diagnostic tests. Among 111 patients, PJI was diagnosed in 78 (70%) and aseptic failure in 33 (30%). For the diagnosis of PJI, the sensitivity and specificity of periprosthetic tissue culture was 51 and 100%, of sonication fluid culture 58 and 100%, and of sonication fluid PCR 51 and 94%, respectively. Among 70 microorganisms, periprosthetic tissue culture grew 52 (74%), sonication fluid culture grew 50 (71%) and sonication fluid PCR detected 37 pathogens (53%). If only organisms are considered, for which primers are included in the test panel, PCR detected 37 of 58 pathogens (64%). The sonication fluid PCR missed 19 pathogens (predominantly oral streptococci and anaerobes), whereas 7 additional microorganisms were detected only by PCR (including Cutibacterium spp. and coagulase-negative staphylococci). The performance of multiplex PCR using sonication fluid is comparable to culture of periprosthetic tissue or sonication fluid. The advantages of PCR are short processing time (PCR, especially of low-virulent organisms.

  11. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  12. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  13. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  14. Assessing the Robustness of Thermoeconomic Diagnosis of Fouled Evaporators: Sensitivity Analysis of the Exergetic Performance of Direct Expansion Coils

    Directory of Open Access Journals (Sweden)

    Antonio Piacentino

    2016-03-01

    Full Text Available Thermoeconomic diagnosis of refrigeration systems is a pioneering approach to the diagnosis of malfunctions, which has been recently proven to achieve good performances for the detection of specific faults. Being an exergy-based diagnostic technique, its performance is influenced by the trends of exergy functions in the “design” and “abnormal” conditions. In this paper the sensitivity of performance of thermoeconomic diagnosis in detecting a fouled direct expansion coil and quantifying the additional consumption it induces is investigated; this fault is critical due to the simultaneous air cooling and dehumidification occurring in the coil, that induce variations in both the chemical and thermal fractions of air exergy. The examined parameters are the temperature and humidity of inlet air, the humidity of reference state and the sensible/latent heat ratio (varied by considering different coil depths. The exergy analysis reveals that due to the more intense dehumidification occurring in presence of fouling, the exergy efficiency of the evaporator coil eventually increases. Once the diagnostic technique is based only on the thermal fraction of air exergy, the results suggest that the performance of the technique increases when inlet air has a lower absolute humidity, as evident from the “optimal performance” regions identified on a psychrometric chart.

  15. The safety performance management system: A tool for diagnosis, intervention and measurement

    International Nuclear Information System (INIS)

    Haber, S.B.; Shurberg, D.A.

    2002-01-01

    Many organizations depend on human performance to avoid incidents involving significant adverse consequences. Such organizations are typically termed high reliability organizations (HROs). While heavy emphasis has been placed on designing system hardware and software to intercept and mitigate events that could cause adverse consequences, dealing with the design of the human component has proven to be more complicated. Examination of various safety-related incidents makes it clear that human performance, and in particular organizational processes, plays a dominant role. The human errors are of various origins and are typically part of larger organizational processes that encourage unsafe acts that ultimately produce system failures. It is generally postulated that without an effective organizational safety culture, a safe working environment is impossible. While many different perspectives exist from which safety issues might be addressed, a method that allows the quantitative measurement of organizational processes deemed to impact overall safety performance is considered useful to understand the potential for future inadequate safety performance. This paper describes the Safety Performance Management System, a method useful for diagnosis, subsequent intervention and follow-on measurement. Implications for use of this method are presented and the concluding discussion includes insights regarding the general application of the method to improved facility safety performance. (author)

  16. Performance test of diamond-like carbon films for lubricating ITER blanket maintenance equipment under GPa-level high contact stress

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka; Shibanuma, Kiyoshi

    2007-01-01

    Diamond-like carbon (DLC) coating was tested as a candidate solid lubricant for transmission gears of the maintenance equipment of the blanket of the ITER instead of an oil lubricant. The wear tests using the pin-on-disk method were performed on disks with SCM440 and SNCM420 as the base materials and coated with soft, layered, and hard DLCs. All cases satisfied the required allowable contact stress (2 GPa) and lifetime (10 4 cycles), and therefore the feasibility of the DLC coating was validated. Among the three types of DLCs, the soft DLC showed the best performance. (author)

  17. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  18. Control of Nuclear Materials and Special Equipment (Nuclear Safety Regulations)

    International Nuclear Information System (INIS)

    Cizmek, A.; Prah, M.; Medakovic, S.; Ilijas, B.

    2008-01-01

    Based on Nuclear Safety Act (OG 173/03) the State Office for Nuclear Safety (SONS) in 2008 adopted beside Ordinance on performing nuclear activities (OG 74/06) and Ordinance on special conditions for individual activities to be performed by expert organizations which perform activities in the area of nuclear safety (OG 74/06) the new Ordinance on the control of nuclear material and special equipment (OG 15/08). Ordinance on the control of nuclear material and special equipment lays down the list of nuclear materials and special equipment as well as of nuclear activities covered by the system of control of production of special equipment and non-nuclear material, the procedure for notifying the intention to and filing the application for a license to carry out nuclear activities, and the format and contents of the forms for doing so. This Ordinance also lays down the manner in which nuclear material records have to be kept, the procedure for notifying the State administration organization (regulatory body) responsible for nuclear safety by the nuclear material user, and the keeping of registers of nuclear activities, nuclear material and special equipment by the State administration organization (regulatory body) responsible for nuclear safety, as well as the form and content of official nuclear safety inspector identification card and badge.(author)

  19. Regulation EM-GT-7. Quality control of the radiography equipment

    International Nuclear Information System (INIS)

    2015-01-01

    The purpose of this document is to provide practical guidance of technical procedures for carrying out quality control in X-ray equipment. This guide is applicable to general purpose radiography equipment, although some of the procedures may be applied to other types of diagnostic imaging equipment. The tests described require the appointed instrumentation and some of these can be implemented in the radiodiagnostic given the simplicity of them and others require special equipment and can be performed by external specialized groups to these units.

  20. A Preliminary Study of the Suitability of Archival Bone Marrow and Peripheral Blood Smears for Diagnosis of CML Using FISH

    Directory of Open Access Journals (Sweden)

    Alice Charwudzi

    2014-01-01

    Full Text Available Background. FISH is a molecular cytogenetic technique enabling rapid detection of genetic abnormalities. Facilities that can run fresh/wet samples for molecular diagnosis and monitoring of neoplastic disorders are not readily available in Ghana and other neighbouring countries. This study aims to demonstrate that interphase FISH can successfully be applied to archival methanol-fixed bone marrow and peripheral blood smear slides transported to a more equipped facility for molecular diagnosis of CML. Methods. Interphase FISH was performed on 22 archival methanol-fixed marrow (BM and 3 peripheral blood (PB smear slides obtained at diagnosis. The BM smears included 20 CML and 2 CMML cases diagnosed by morphology; the 3 PB smears were from 3 of the CML patients at the time of diagnosis. Six cases had known BCR-ABL fusion results at diagnosis by RQ-PCR. Full blood count reports at diagnosis were also retrieved. Result. 19 (95% of the CML marrow smears demonstrated the BCR-ABL translocation. There was a significant correlation between the BCR-ABL transcript detected at diagnosis by RQ-PCR and that retrospectively detected by FISH from the aged BM smears at diagnosis (r=0.870; P=0.035. Conclusion. Archival methanol-fixed marrow and peripheral blood smears can be used to detect the BCR-ABL transcript for CML diagnosis.

  1. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  2. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  3. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  4. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  5. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  6. Performance of thyroid scintigraphy in the thyrotoxicosis etiological diagnosis: about 210 cases; Performance de la scintigraphie thyroidienne dans le diagnostic etiologique des thyrotoxicoses: a propos de 210 cas

    Energy Technology Data Exchange (ETDEWEB)

    Chatti, K.; Nouira, M.; Guezguez, M.; Sfar, R.; Essabbah, H. [CHU Sahloul, Service de medecine nucleaire, Sousse (Tunisia); Zantour, B. [CHU Mahdia, service d' endocrinologie (Tunisia)

    2010-07-01

    Purpose: The thyrotoxicosis is a syndrome linked to thyroid hormones excess grouping any causes leading to a overload in circulating hormones, including these ones linked to an inflammatory process (thyroiditis) or an exogenous contribution. The etiologic diagnosis is based on complementary examinations. The objective of our work is to elucidate the performance of scintigraphy in the etiologic diagnosis and the therapy approach of thyrotoxicosis through the experience of our service. Conclusions: Scintigraphy has a place in the etiologic diagnosis of thyrotoxicosis. it brings functional and morphological information and allows to guide the diagnostic and therapeutic approach. (N.C.)

  7. PSAD, a prototype for monitoring and aid to diagnosis of French PWRs

    International Nuclear Information System (INIS)

    Jousselin, A.; Bourgeois, P.; Busquet, J.L.; Monnier, B.; Mouhamed, B.

    1996-01-01

    In order to improve safety and availability in its nuclear power plants, EDF has designed a new generation of monitoring systems integrated into a workstation for monitoring and aid to diagnosis (PSAD). These systems perform on-line monitoring of the main power plant components and PSAD stations provide homogenous aids ro diagnosis which enable plant personnel to diagnose the mechanical behavior of plant equipments. The objective of PSAD is to provide them with high-efficiency and user-friendly tools which can considerably free them from routine tasks. PSAD has a flexible architecture, guaranteeing optimum distribution of computing power to make it available where it is needed, thus enhancing the quality of the information. Its architecture includes diagnosis support software based on artificial intelligence technology which can dialogue with real-time or deferred-time processing software and a relational database. The first version of the prototype is working on a french plant at Tricastin. This version includes the software for the host structure and two monitoring functions: the reactor coolant pumps and the turbo-generator monitoring functions. Internal Structures Monitoring function (ISM) and Loose Parts Detection function (LPD) are under development and should be integrated into PSAD prototype in 1996. (author). 5 refs., 6 figs

  8. Simulation Gaming in Construction: ER, The Equipment Replacement Game.

    Science.gov (United States)

    Nassar, Khaled

    2002-01-01

    The Equipment Replacement simulation game can be used to explain the different effects of various equipment buy/sell strategies on the economic performance of construction companies. The probabilistic aspect of demand in the construction market is incorporated. The game is implemented using Excel and Visual Basic for Applications. (Author/SK)

  9. Occupational therapy needs of patients with thoracic cancer at the time of diagnosis: findings of a dedicated rehabilitation service.

    Science.gov (United States)

    Bentley, Rachel; Hussain, Asmah; Maddocks, Matthew; Wilcock, Andrew

    2013-06-01

    Guidelines recommend screening patients with cancer to identify their rehabilitation needs. To help quantify this area of need and associated workload from an occupational therapy perspective in patients with thoracic cancer, we report the experiences of a dedicated rehabilitation service. Consecutive patients were screened soon after diagnosis using items associated with occupational performance in the Sheffield Profile for Assessment and Referral for Care questionnaire. Those reporting predetermined levels of distress underwent a full occupational therapy evaluation; this generated a problem list from which individualised goals and interventions were instigated. Of 540 patients screened, 273 (51 %) reported levels of distress which warranted a full occupational therapy assessment. Of these, 260 (95%) reported a total of 681 problems (median of 4 [2-5] per patient). Mostly these lay within the domain of self care (553, 78%) in the categories of transfers, functional mobility and bathing/showering. A total of 646 goals (median of 2 [1-3] per patient) were formulated, resulting in 652 individual interventions, most frequently the provision of equipment (79%) or advice (32%) and referral to another professional/agency (23%). Patients considered that most goals were achieved (98%) and that the provision of equipment was useful (97%). About half of patients with thoracic cancer screened have occupational therapy needs around the time of diagnosis. Problems are mostly in the area of self-care, with equipment provision the most frequent intervention provided. Future work should examine the efficacy of occupational therapy interventions further.

  10. Condition monitoring and fault diagnosis of motor bearings using undersampled vibration signals from a wireless sensor network

    Science.gov (United States)

    Lu, Siliang; Zhou, Peng; Wang, Xiaoxian; Liu, Yongbin; Liu, Fang; Zhao, Jiwen

    2018-02-01

    Wireless sensor networks (WSNs) which consist of miscellaneous sensors are used frequently in monitoring vital equipment. Benefiting from the development of data mining technologies, the massive data generated by sensors facilitate condition monitoring and fault diagnosis. However, too much data increase storage space, energy consumption, and computing resource, which can be considered fatal weaknesses for a WSN with limited resources. This study investigates a new method for motor bearings condition monitoring and fault diagnosis using the undersampled vibration signals acquired from a WSN. The proposed method, which is a fusion of the kurtogram, analog domain bandpass filtering, bandpass sampling, and demodulated resonance technique, can reduce the sampled data length while retaining the monitoring and diagnosis performance. A WSN prototype was designed, and simulations and experiments were conducted to evaluate the effectiveness and efficiency of the proposed method. Experimental results indicated that the sampled data length and transmission time of the proposed method result in a decrease of over 80% in comparison with that of the traditional method. Therefore, the proposed method indicates potential applications on condition monitoring and fault diagnosis of motor bearings installed in remote areas, such as wind farms and offshore platforms.

  11. [Diagnosis of upper urinary tract tumors. A pending challenge].

    Science.gov (United States)

    Westendarp, M; Laguna, M P; de la Rosette, J J M C

    2014-07-01

    Early diagnosis of upper urinary tract tumors is not easy. The development of endoscopic equipment has expanded the group of patients candidates for minimally invasive treatment. Only by providing accurate tumor staging and grading can clinicians decide which patients should be offered conservative therapies. We need diagnostic methods that allow us to make an early and accurate diagnosis for these lesions, as well as safe follow-up. Our proposal is to present a review of the most used diagnostic method, their features, and future diagnostic tools. The diagnostic arsenal requires further improvement. Only through accurate diagnosis, we will be able to safely provide conservative treatment. Developing new diagnostic techniques seem to move us closer to this goal even more. We propose a working algorithm on the management of these lesions.

  12. Development of augmented reality system for servicing electromechanical equipment

    Science.gov (United States)

    Zhukovskiy, Y.; Koteleva, N.

    2018-05-01

    Electromechanical equipment is widely used. It is used in industrial enterprises, in the spheres of public services, in everyday life, etc. Maintenance servicing of electromechanical equipment is an important part of its life cycle. High-quality and timely service can extend the life of the electromechanical equipment. The creation of special systems that simplify the process of servicing electromechanical equipment is an urgent task. Such systems can shorten the time for maintenance of electrical equipment, and, therefore, reduce the cost of maintenance in general. This article presents an analysis of information on the operation of service services for maintenance and repair of electromechanical equipment, identifies the list of services, and estimates the time required to perform basic service operations. The structure of the augmented reality system is presented, the ways of interaction of the augmented reality system with the automated control systems working at the enterprise are presented.

  13. Individual differences and the effects of an information aid in performance of a fault diagnosis task

    NARCIS (Netherlands)

    Raaijmakers, J.G.W.; Verduyn, W.W.

    1996-01-01

    Two experiments are reported that investigated the performance of operators in a fault diagnosis task. Naval engineers working in the Ship's Control Centre (SCC) on board of frigates of the Royal Netherlands Navy were asked to solve a number of unfamiliar fault problems. In the first experiment, it

  14. Retrieval of buried waste using conventional equipment

    International Nuclear Information System (INIS)

    Valentich, D.J.

    1994-01-01

    A field test was conducted to determine the effectiveness of using conventional type construction equipment for the retrieval of buried transuranic (TRU) waste. A cold (nonhazardous and nonradioactive test pit 841 m 3 in volume) was constructed with boxes and drums filled with simulated waste materials, such as metal, plastic, wood, concrete, and sludge. Large objects, including truck beds, vessels, vaults, pipes, and beams were also placed in the pit. These materials were intended to simulate the type of waste found in existing TRU buried waste pits and trenches. A series of commercially available equipment items, such as excavators and tracked loaders outfitted with different end effectors, were used to remove the simulated waste. Work was performed from both the abovegrade and belowgrade positions. During the demonstration, a number of observations, measurements, and analyses were performed to determine which equipment was the most effective in removing the waste. The retrieval rates for the various excavation techniques were recorded. The inherent dust control capabilities of the excavation methods used were also observed

  15. Consideration of demand rate in overall equipment effetiveness (OEE on equipment with constant process time

    Directory of Open Access Journals (Sweden)

    Perumal Puvanasvaran

    2013-06-01

    Full Text Available Purpose: The paper is primarily done on the purpose of introducing new concept in defining the Overall Equipment Effectiveness (OEE with the consideration of both machine utilization and customer demand requested. Previous literature concerning the limitation and difficulty of OEE implementation has been investigated in order to track out the potential opportunities to be improved, since the OEE has been widely accepted by most of the industries regardless their manufacturing environment.Design/methodology/approach: The paper is conducting the study based on literature review and the computerized data collection. In details, the novel definition and method of processing the computerized data are all interpreted based on similar studies performed by others and supported by related journals in proving the validation of the output. Over the things, the computerized data are the product amount and total time elapsed on each production which is automatically recorded by the system at the manufacturing site.Findings: The finding of this paper is firstly the exposure and emphasis of limitation exists in current implementation of OEE, which showing that high utilization of the machine is encouraged regardless of the customer demand and is having conflict with the inventory handling cost. This is certainly obvious with overproduction issue especially during low customer demand period. The second limitation in general implementation of OEE is the difficulty in obtaining the ideal cycle time, especially those equipments with constant process time. The section of this paper afterward comes out with the proposed solution in fixing this problem through the definition of performance ratio and then usage of this definition in measuring the machine utilization from time to time. Before this, the time available for the production is calculated incorporating the availability of OEE, which is then used to get the Takt time.Research limitations/implications: Future

  16. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  17. Comparison of the performance of laboratory tests in the diagnosis of feline infectious peritonitis.

    Science.gov (United States)

    Stranieri, Angelica; Giordano, Alessia; Paltrinieri, Saverio; Giudice, Chiara; Cannito, Valentina; Lauzi, Stefania

    2018-05-01

    We compared the performance of clinicopathologic and molecular tests used in the antemortem diagnosis of feline infectious peritonitis (FIP). From 16 FIP and 14 non-FIP cats, we evaluated retrospectively the sensitivity, specificity, and likelihood ratios (LRs) of serum protein electrophoresis, α 1 -acid glycoprotein (AGP) on peripheral blood, screening reverse-transcription nested PCR (RT-nPCR) on the 3'-untranslated region (3'-UTR), and spike (S) gene sequencing on peripheral blood, body cavity effusions, and tissue, as well as body cavity cytology and delta total nucleated cell count (ΔTNC). Any of these tests on blood, and especially the molecular tests, may support or confirm a clinical diagnosis of FIP. A negative result does not exclude the disease except for AGP. Cytology, 3'-UTR PCR, and ΔTNC may confirm a clinical diagnosis on effusions; cytology or 3'-UTR PCR may exclude FIP. Conversely, S gene sequencing is not recommended based on the LRs. On tissues, S gene sequencing is preferable when histology is highly consistent with FIP, and 3'-UTR PCR when FIP is unlikely. Combining one test with high LR+ with one with low LR- (e.g., molecular tests and AGP on blood, ΔTNC and cytology in effusions) may improve the diagnostic power of the most used laboratory tests.

  18. Recent Technology of Sensing, Monitoring, Diagnosis, and Maintenance for Aged Electric Power and Energy System

    Science.gov (United States)

    Matsumoto, Satoshi

    This paper deals with the recent topics related to sensing, monitoring, and diagnosis for electric power equipment. Moreover the risk management for such equipments has been an object of study in many terms such as economical, technical aspects, safety and rest, CSR (Corporate Social Responsibility) etc. The relationship between the function of the economic engineering and the maintenance strategy for electric power system are reviewed.

  19. Reduced medical and occupational exposures by optimizing working procedures in fluoroscopy equipment in the University Hospital of Santa Maria (RS)

    International Nuclear Information System (INIS)

    Weis, Guilherme L.; Claus, Thiago V.; Baumhardt, Tadeu; Shuch, Luiz A.

    2013-01-01

    This work seeks to reduce medical (patient) and occupational (workers) exposure by standardizing resources available in fluoroscopy equipment used in interventional procedures. Such procedures use transportable surgical arch type fluoroscopy equipment, with applications in orthopedics, angiography and pacemaker implantation. Improper use of these devices generates excessive radiation doses in both patients and the medical staff. It is observed that the equipment after being connected to the grid, is pre-selected to work in continuous fluoroscopy and no additional filtration, producing higher doses of radiation. For specific applications, changes in protocols should be undertaken according to medical indication. This work used a fluoroscopy equipment Shimadzu Active Opescope two radiation monitoring equipment, brand Radcal, models 9010 and 9015, two ionization chambers, of 60 cc and 180 cc and a low contrast phantom and a catheter, information that simulate the human body. Incidences were performed by changing the conditions of exposure as frame rates (fps - frames per second) and additional filtration. For each composition parameters was generated and filed an image, with the extent of their respective doses. These images were evaluated by radiologists. In more extreme cases we obtained a reduction of a factor 25 in occupational exposure (medical personnel) using the pulsed with the greatest 2 fps additional filter (0.3 mm Cu) compared to continuous system without any additional filtration. In medical exposure (of patients), decreased by a factor 39, the same conditions described above. With these arguments it is justified the optimization and standardization of the equipment used in fluoroscopy, which besides providing a dose reduction the patient and the medical personnel, increases the life of the X-ray tube while maintaining the quality of medical diagnosis. (author)

  20. Quality assurance procedures in radiotherapy - IEC specifications for equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rassow, J; Klieber, E

    1986-08-01

    The International Electrotechnical Commission (IEC) worked out international standards for requirements and tests of electrical, mechanical and radiation safety as well as for definition and tests of functional performance characteristics of radiotherapy equipments (medical electron accelerators, gamma beam teletherapy and afterloading equipments, simulators and accessories) and for clinical dosimeters and terminology for medical radiology. A survey is given on the actual state of standardization projects. The problems of such standards are shown for the standard for functional performance characteristics of medical electron accelerators as example.

  1. Quality assurance procedures in radiotherapy - IEC specifications for equipment

    International Nuclear Information System (INIS)

    Rassow, J.; Klieber, E.

    1986-01-01

    The International Electrotechnical Commission (IEC) worked out international standards for requirements and tests of electrical, mechanical and radiation safety as well as for definition and tests of functional performance characteristics of radiotherapy equipments (medical electron accelerators, gamma beam teletherapy and afterloading equipments, simulators and accessories) and for clinical dosimeters and terminology for medical radiology. A survey is given on the actual state of standardization projects. The problems of such standards are shown for the standard for functional performance characteristics of medical electron accelerators as example. (orig.) [de

  2. Technology review of commercial food service equipment - final report

    Energy Technology Data Exchange (ETDEWEB)

    Rahbar, S; Krsikapa, S [Canadian Gas Research Inst., Don Mills, ON (Canada); Fisher, D; Nickel, J; Ardley, S; Zabrowski, D [Fisher Consultants (Canada); Barker, R F [ed.

    1996-05-15

    Technical information on commercial gas cooking appliances was presented. This second volume provided an appliance-by-appliance comprehensive assessment of the energy performance of commercial food service equipment. Energy assessments were made for the following categories of cooking equipment: fryers, griddles, broilers, ranges, Chinese ranges, ovens, steamers, steam kettles, and braising pans. Recommendations were made for improving the energy efficiency and overall performance of gas appliances to support of the Canadian gas utilities marketing and energy conservation initiatives. 71 refs., 37 tabs., 58 figs.

  3. Radiation protection in dentistry. Recommended safety procedures for the use of dental x-ray equipment. Safety code 30

    International Nuclear Information System (INIS)

    1994-01-01

    The Radiation Protection Bureau has prepared a series of documents on safety codes to set out requirements for the safe use of radiation-emitting equipment. This Safety Code has been prepared to provide specific guidance to the dentist, dental hygienist, dental assistant and other support personnel concerned with safety procedures and equipment performance. Dental radiography is one of the most valuable tools used in modern dental health care. It makes possible the diagnosis of physical conditions that would otherwise be difficult to identify. The use of dental radiological procedures must be carefully managed, because x-radiation has the potential for damaging healthy cells and tissues. Although no known occurrence of cancer or genetic damage has been observed from radiation doses delivered in modern dentistry, and until more evidence is available, one should practice radiation hygiene with the same care as would be dictated if a hazard were known to exist. The aim of radiation protection in dentistry is to obtain the desired clinical information with minimal radiation exposure to patients, dental personnel and the public. 15 tabs

  4. Radiation protection in dentistry. Recommended safety procedures for the use of dental x-ray equipment. Safety code 30

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Radiation Protection Bureau has prepared a series of documents on safety codes to set out requirements for the safe use of radiation-emitting equipment. This Safety Code has been prepared to provide specific guidance to the dentist, dental hygienist, dental assistant and other support personnel concerned with safety procedures and equipment performance. Dental radiography is one of the most valuable tools used in modern dental health care. It makes possible the diagnosis of physical conditions that would otherwise be difficult to identify. The use of dental radiological procedures must be carefully managed, because x-radiation has the potential for damaging healthy cells and tissues. Although no known occurrence of cancer or genetic damage has been observed from radiation doses delivered in modern dentistry, and until more evidence is available, one should practice radiation hygiene with the same care as would be dictated if a hazard were known to exist. The aim of radiation protection in dentistry is to obtain the desired clinical information with minimal radiation exposure to patients, dental personnel and the public. 15 tabs.

  5. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  6. INTELLECTUAL AND ACADEMIC PERFORMANCE OF CHILDREN WITH CONGENITAL HYPOTHYROIDISM IN RELATION TO TIME OF DIAGNOSIS

    Directory of Open Access Journals (Sweden)

    Madhava Vijaya Kumar

    2016-12-01

    Full Text Available BACKGROUND Context- Congenital hypothyroidism is an important cause of preventable mental retardation in children. Since, neonatal screening is not done routinely in India, many cases are diagnosed late. Earlier, the diagnosis and initiation of treatment, better will be the outcome. The aim of the study is to assess the effect of time of onset of treatment in intellectual and scholastic performances in children with congenital hypothyroidism. MATERIALS AND METHODS Children were classified into 3 groups. Group 1 were diagnosed and treatment initiated within one month of birth. Group 2, between 1 and 6 months and group 3 after 6 months. General intelligence and IQ were assessed by Malin’s intelligence scale for Indian children. Scholastic performance were evaluated by academic evaluation scale for slow learners and ADHD were diagnosed by DSM-IV criteria. Settings and Design- The study was done in the Paediatric Endocrinology Clinic of Institute of Maternal and Child Health, Department of Paediatrics, Government Medical College, Kozhikode. Study population included children of age group 6-9 years with congenital hypothyroidism. Statistical Methods Used- Statistical analysis was done with SPSS software version 16. The statistical analysis was done by ANOVA test. RESULTS IQ and intellectual outcomes were better in group 1 where treatment was initiated within one month. Similarly, poor academic abilities and increased incidence of ADHD were noted in children in whom diagnosis was made late. CONCLUSION Later the diagnosis more will be the intellectual and scholastic backwardness in children underscoring the importance of universal newborn screening.

  7. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  8. Experimental Investigation of Thermohydraulic Performance of a Rectangular Solar Air Heater Duct Equipped with V-Shaped Perforated Blocks

    Directory of Open Access Journals (Sweden)

    Tabish Alam

    2014-01-01

    Full Text Available This paper presents the thermohydraulic performance of rectangular solar air heater duct equipped with V-shaped rectangular perforated blocks attached to the heated surface. The V-shaped perforated blocks are tested for downstream (V-down to the air flow at Reynolds number from 2000 to 20000. The perforated blocks have relative pitch ratio (P/e from 4 to 12, relative blockage height ratio (e/H from 0.4 to 1.0, and open area ration from 5% to 25% at a fixed value of angle of attack of 60∘ in a rectangular duct having duct aspect ratio (W/H of 12. Thermohydraulic performance is compared at different geometrical parameters of V-shaped perforated blocks for equal pumping power which shows that maximum performance is observed at a relative pitch of 8, relative rib height of 0.8, and open area ration of 20%. It is also observed that the performance of V-shaped perforated blocks was better than transverse-perforated blocks.

  9. From product to service orientation in the maritime equipment industry

    DEFF Research Database (Denmark)

    Matzen, Detlef; McAloone, Timothy Charles

    2008-01-01

    of their products in operation. In this paper we present a case study of a shipping equipment manufacturer that is currently shifting business focus from manufacturing towards services delivery. Using a modelling scheme to differentiate and categorise different development tasks within the frame of business......In the shipping industry, operational performance of ships and their equipment is crucial to business. Suppliers of machinery and equipment are aware of this situation and see business development potential in setting up service systems that are dedicated to ensuring the performance...... development towards service oriented business, the case delivers insights into the broader context and product related parameters influencing the options and requirements for service system development....

  10. Calibration of laboratory equipment and its intermediate verification

    International Nuclear Information System (INIS)

    Remedi, Jorge O.

    2011-01-01

    When a laboratory wants to prove that he has technical competence to carry out tests or calibrations must demonstrate that it has complied with certain requirements that establish , among others, the mandatory : calibrate or verify equipment before putting it into service in order to ensure that it meets to the specifications of laboratory equipment to keep records evidencing the checks that equipment complies with the specification ; perform intermediate checks for maintain confidence in the calibration status of the equipment , ensure that the operation is checked and calibration status of equipment when the equipment goes outside the direct control of the laboratory , before be returned to service, establish a program and procedure for the calibration of equipment; show how determined the calibration periods of their equipment as well as evidence that intermediate checks are suitable for the calibration periods. However, some confusion is observed as to the meaning of the terms 'calibration' and 'verification' of a computer. This paper analyzes applicable documentation and suggests that the differences are generated in part by translations and by characterization concepts upon its usage, that is, if it is legal metrology or assessment conformity. Therefore, this study aims to characterize both concepts , fundamentals to zoom distinguish , outline appropriate strategies for calibration and verification activities to ensure the compliance with regulatory requirements [es

  11. Diagnosis diagrams for passing signals on an automatic block signaling railway section

    Science.gov (United States)

    Spunei, E.; Piroi, I.; Chioncel, C. P.; Piroi, F.

    2018-01-01

    This work presents a diagnosis method for railway traffic security installations. More specifically, the authors present a series of diagnosis charts for passing signals on a railway block equipped with an automatic block signaling installation. These charts are based on the exploitation electric schemes, and are subsequently used to develop a diagnosis software package. The thus developed software package contributes substantially to a reduction of failure detection and remedy for these types of installation faults. The use of the software package eliminates making wrong decisions in the fault detection process, decisions that may result in longer remedy times and, sometimes, to railway traffic events.

  12. Surgeon-Performed Ultrasound-Guided Fine-Needle Aspiration Cytology (SP-US-FNAC) Shortens Time for Diagnosis of Thyroid Nodules.

    Science.gov (United States)

    Gu, Wei Xiang; Tan, Chuen Seng; Ho, Thomas W T

    2014-06-01

    Ultrasound-guided fine-needle aspiration cytology (US-FNAC) of thyroid nodules is an important diagnostic procedure. In most hospitals, patients are referred to radiologists for US-FNAC, but this often results in a long waiting time before results are available. Surgeon-performed US-FNAC (SP-US-FNAC) during the initial patient consultation attempts to reduce the waiting time but it is not known whether this is as accurate as radiologist-performed US-FNAC (RP-US-FNAC). The aim of this study is to compare the clinical efficiency between SP-US-FNAC and RP-US-FNAC. A retrospective study was performed on patients from the Department of General Surgery, Tan Tock Seng Hospital (TTSH) who underwent an US-FNAC from August 2011 to May 2012. All cases of SP-US-FNAC were performed by a single surgeon. This study compared the rates of positive diagnoses achieved by SP-US-FNAC and RPUS- FNAC as well as the time interval to reach a cytological diagnosis by each group. A total of 40 cases of SP-US-FNAC and 72 cases of RP-US-FNAC were included in the study. SP-US-FNAC resulted in 28 (70%) positive diagnoses and 12 (30%) nondiagnoses while RP-US-FNAC resulted in 47 (65.3%) positive diagnoses and 25 (34.7%) non-diagnoses. These results were comparable (P=0.678). The median time taken to reach a cytological diagnosis was 1 working day for SP-US-FNAC and 29.5 working days for RP-US-FNAC resulting in a shorter interval to reaching a cytological diagnosis for SP-US-FNAC (P<0.001). In the workup of thyroid nodules, SP-US-FNAC is as accurate as RP-US-FNAC but significantly reduces the time taken to reach a cytological diagnosis. This leads to greater clinical efficiency in the management of patients with thyroid nodules, which in turn leads to other benefits such as decreased patient anxiety and increased patient satisfaction.

  13. 77 FR 13173 - Best Equipped Best Served

    Science.gov (United States)

    2012-03-05

    ... on the best equipped, best performing, best served concept for implementation in the 2012-2014... Advisory Committee (NAC). FAA is seeking stakeholder input on the technical and operational feasibility of...

  14. Improving the efficiency of thermal power equipment based on technologies using surfactants

    Science.gov (United States)

    Nikolaeva, L. A.; Zueva, O. S.

    2015-10-01

    The formation of deposits on the functional surfaces of the equipment of heating systems and their corrosion are one of the major energetic problems. To improve the operational efficiency of thermal power equipment, surface-active agents (surfactants) are widely used, which are applied for the treatment of the working surfaces before use, during use, to prevent the parking corrosion, as well as while performing periodic chemical cleanings of power equipment. The tests have been performed, and the technology of application of Auge Neo Ac 56 acid product (MAHIM, Kazan) has been developed, designed to remove mineral deposits and scale from cooling and boiler systems without mechanical influence on them and without disassembly of technological equipment.

  15. A sequential fuzzy diagnosis method for rotating machinery using ant colony optimization and possibility theory

    Energy Technology Data Exchange (ETDEWEB)

    Sun, Hao; Ping, Xueliang; Cao, Yi; Lie, Ke [Jiangnan University, Wuxi (China); Chen, Peng [Mie University, Mie (Japan); Wang, Huaqing [Beijing University, Beijing (China)

    2014-04-15

    This study proposes a novel intelligent fault diagnosis method for rotating machinery using ant colony optimization (ACO) and possibility theory. The non-dimensional symptom parameters (NSPs) in the frequency domain are defined to reflect the features of the vibration signals measured in each state. A sensitive evaluation method for selecting good symptom parameters using principal component analysis (PCA) is proposed for detecting and distinguishing faults in rotating machinery. By using ACO clustering algorithm, the synthesizing symptom parameters (SSP) for condition diagnosis are obtained. A fuzzy diagnosis method using sequential inference and possibility theory is also proposed, by which the conditions of the machinery can be identified sequentially. Lastly, the proposed method is compared with a conventional neural networks (NN) method. Practical examples of diagnosis for a V-belt driving equipment used in a centrifugal fan are provided to verify the effectiveness of the proposed method. The results verify that the faults that often occur in V-belt driving equipment, such as a pulley defect state, a belt defect state and a belt looseness state, are effectively identified by the proposed method, while these faults are difficult to detect using conventional NN.

  16. Physiological, Biomechanical, and Maximal Performance Comparisons of Female Soldiers Carrying Loads Using Prototype U.S. Marine Corps Modular Lightweight Load-Carrying Equipment (MOLLE) with Interceptor Body Armor and U.S. Army All-Purpose Lightweight Individual Carrying Equipment (ALICE) with PASGT Body Armor

    National Research Council Canada - National Science Library

    Harman, Everett

    1999-01-01

    The experiment evaluated the physiological, biomechanical, and maximal performance responses of 12 female soldiers carrying loads with prototype Modular Lightweight Load-Carrying Equipment with Interceptor body armor (MOLLE...

  17. Electron Beam Diagnosis and Dynamics using DIADYN Plasma Source

    International Nuclear Information System (INIS)

    Toader, D.; Craciun, G.; Manaila, E.; Oproiu, C.; Marghitu, S.

    2009-01-01

    This paper is presenting results obtained with the DIADYN installation after replacing its vacuum electron source (VES L V) with a plasma electron source (PES L V). DIADYN is a low energy laboratory equipment operating with 10 to 50 keV electron beams and designed to help realize non-destructive diagnosis and dynamics for low energy electron beams but also to be used in future material irradiations. The results presented here regard the beam diagnosis and dynamics made with beams obtained from the newly replaced plasma source. We discuss both results obtained in experimental dynamics and dynamics calculation results for electron beams extracted from the SEP L V source.

  18. Nuclear equipment recalsification based on the service experience

    International Nuclear Information System (INIS)

    Geambasu, A.; Segarceanu, D.

    2000-01-01

    The paper presents some considerations concerning the need of comparison between equipment performance proven by test and the service experience in Cernavoda Nuclear Plant. Service performance dana obtain partly from service failures (failures times) and partly from service experience without failure (running times) can be statistically analyzed to obtain predictions of the number of failures of unfailed units in specified period of time, means time to first failure, means time of median failure, a.s.o. These informations can be used during the operation of Nuclear Power Plant to estimate when a equipment should be replaced with a new one in order to prevent getting to the life end point. (author)

  19. Diagnosis of Helicobacter pylori infection: Current options and developments

    Science.gov (United States)

    Wang, Yao-Kuang; Kuo, Fu-Chen; Liu, Chung-Jung; Wu, Meng-Chieh; Shih, Hsiang-Yao; Wang, Sophie SW; Wu, Jeng-Yih; Kuo, Chao-Hung; Huang, Yao-Kang; Wu, Deng-Chyang

    2015-01-01

    Accurate diagnosis of Helicobacter pylori (H. pylori) infection is a crucial part in the effective management of many gastroduodenal diseases. Several invasive and non-invasive diagnostic tests are available for the detection of H. pylori and each test has its usefulness and limitations in different clinical situations. Although none can be considered as a single gold standard in clinical practice, several techniques have been developed to give the more reliable results. Invasive tests are performed via endoscopic biopsy specimens and these tests include histology, culture, rapid urease test as well as molecular methods. Developments of endoscopic equipment also contribute to the real-time diagnosis of H. pylori during endoscopy. Urea breathing test and stool antigen test are most widely used non-invasive tests, whereas serology is useful in screening and epidemiological studies. Molecular methods have been used in variable specimens other than gastric mucosa. More than detection of H. pylori infection, several tests are introduced into the evaluation of virulence factors and antibiotic sensitivity of H. pylori, as well as screening precancerous lesions and gastric cancer. The aim of this article is to review the current options and novel developments of diagnostic tests and their applications in different clinical conditions or for specific purposes. PMID:26523098

  20. Clinical diagnosis versus autopsy diagnosis in head trauma

    Directory of Open Access Journals (Sweden)

    Velnic Andreea-Alexandra

    2017-12-01

    Full Text Available The correct and complete diagnosis is essential for the adequate care and the favourable clinical evolution of the patients with head trauma. Purpose: To identify the error rate in the clinical diagnosis of head injuries as shown in comparison with the autopsy diagnosis and to identify the most common sources of error. Material and method: We performed a retrospective study based on data from the medical files and the autopsy reports of patients with head trauma who died in the hospital and underwent forensic autopsy. We collected: demographic data, clinical and laboratory data and autopsy findings. To quantify the concordance rate between the clinical diagnosis of death and the autopsy diagnosis we used a 4 classes classification, which ranged from 100% concordance (C1 to total discordance (C4 and two classes of partial discordance: C2 (partial discordance in favour of the clinical diagnosis- missing injuries in the autopsy reports and C3 (partial discordance in favor of the necroptic diagnosis- missing injuries in the medical files. Data were analyzed with SPSS version 20.0. Results: We analyzed 194 cases of death due to head injuries. We found a total concordance between the clinical death diagnosis and autopsy diagnosis in 30.4% of cases and at least one discrepancy in 69.6% of cases. Increasing the duration of hospitalization directly correlates with the amount of the imaging investigations and these in turn correlates with an increased rate of diagnosis concordance. Among the patients with stage 3 coma who associated a spinal cord injury, we found a partial diagnosis discordance in 50% of cases and a total discordance in 50% of cases, possibly due to the need for conducting emergency imaging investigation and the need for surgical treatment. In cases with partial and total discordant diagnosis, at least one lesion was omitted in 45.1% of the cases. The most commonly omitted injuries in C2 cases were subdural hematoma, intracerebral

  1. Fault Diagnosis of Three Phase Induction Motor Using Current Signal, MSAF-Ratio15 and Selected Classifiers

    Directory of Open Access Journals (Sweden)

    Glowacz A.

    2017-12-01

    Full Text Available A degradation of metallurgical equipment is normal process depended on time. Some factors such as: operation process, friction, high temperature can accelerate the degradation process of metallurgical equipment. In this paper the authors analyzed three phase induction motors. These motors are common used in the metallurgy industry, for example in conveyor belt. The diagnostics of such motors is essential. An early detection of faults prevents financial loss and downtimes. The authors proposed a technique of fault diagnosis based on recognition of currents. The authors analyzed 4 states of three phase induction motor: healthy three phase induction motor, three phase induction motor with 1 faulty rotor bar, three phase induction motor with 2 faulty rotor bars, three phase induction motor with faulty ring of squirrel-cage. An analysis was carried out for original method of feature extraction called MSAF-RATIO15 (Method of Selection of Amplitudes of Frequencies – Ratio 15% of maximum of amplitude. A classification of feature vectors was performed by Bayes classifier, Linear Discriminant Analysis (LDA and Nearest Neighbour classifier. The proposed technique of fault diagnosis can be used for protection of three phase induction motors and other rotating electrical machines. In the near future the authors will analyze other motors and faults. There is also idea to use thermal, acoustic, electrical, vibration signal together.

  2. Experience in testing and inspection and maintenance of material handling equipments

    International Nuclear Information System (INIS)

    Sharma, M.L.

    2009-01-01

    All the Industries, Power Projects/Stations, Organizations engaged in the field of process of manufacturing, power generation, transportation, design, layout, manufacturing, and supply have to utilize material handling equipment, machinery tools tackles, lifting gears for performing their tasks/activities. The major role of the material handling equipments play an important role and a component of 40% of the total activities of the system/process to achieve targeted output with the reliability and quality is performed by material handling equipment and machineries. The material handling equipment shall have to be chosen/selected to suit the process requirement at times to be specifically designed inspected and tested to meet the specific requirement. These equipment/machineries/lifting gears have to undergo for the periodical inspection and testing to qualify for further use in a specified period. All those equipment and machinery to be used for material handling if not found satisfactory during inspection and testing or otherwise also shall be dismantled/stripped to the extent of inspection requirement of the components/sub components and maintenance repair shall have to be done to make them worthy for reuse after testing and inspection duly witnessed by competent authority

  3. Diagnosis of common congenital heart anomalies in the dog using survey and nonselective contrast radiography

    International Nuclear Information System (INIS)

    Stickle, R.L.; Anderson, L.K.

    1987-01-01

    The most common canine congenital heart anomalies include patient ductus arteriosus, ventricular septal defects, tetralogy of Fallot, pulmonic stenosis, and aortic stenosis. Survey radiography and nonselective (venous) angiography can allow the practicing veterinarian to confirm the diagnosis in many of these patients. Typical radiographic findings using these diagnostic procedures are reviewed. Nonselective angiocardiography is a relatively easy, rapid, and noninvasive procedure which can be performed using conventional equipment. The major disadvantage of this special procedure is that the superimposition of opacified structures can make the identification of some left-to-right shunts difficult. Dilution of contrast medium can occur if a rapid bolus injection is not made

  4. The Fault Diagnosis of Rolling Bearing Based on Ensemble Empirical Mode Decomposition and Random Forest

    Directory of Open Access Journals (Sweden)

    Xiwen Qin

    2017-01-01

    Full Text Available Accurate diagnosis of rolling bearing fault on the normal operation of machinery and equipment has a very important significance. A method combining Ensemble Empirical Mode Decomposition (EEMD and Random Forest (RF is proposed. Firstly, the original signal is decomposed into several intrinsic mode functions (IMFs by EEMD, and the effective IMFs are selected. Then their energy entropy is calculated as the feature. Finally, the classification is performed by RF. In addition, the wavelet method is also used in the proposed process, the same as EEMD. The results of the comparison show that the EEMD method is more accurate than the wavelet method.

  5. Development of nuclear power plant diagnosis technique using neural networks

    International Nuclear Information System (INIS)

    Horiguchi, Masahiro; Fukawa, Naohiro; Nishimura, Kazuo

    1991-01-01

    A nuclear power plant diagnosis technique has been developed, called transient phenomena analysis, which employs neural network. The neural networks identify malfunctioning equipment by recognizing the pattern of main plant parameters, making it possible to locate the cause of an abnormality when a plant is in a transient state. In a case where some piece of equipment shows abnormal behavior, many plant parameters either directly or indirectly related to that equipment change simultaneously. When an abrupt change in a plant parameter is detected, changes in the 49 main plant parameters are classified into three types and a characteristic change pattern consisting of 49 data is defined. The neural networks then judge the cause of the abnormality from this pattern. This neural-network-based technique can recognize 100 patterns that are characterized by the causes of plant abnormality. (author)

  6. A hybrid fault diagnosis approach based on mixed-domain state features for rotating machinery.

    Science.gov (United States)

    Xue, Xiaoming; Zhou, Jianzhong

    2017-01-01

    To make further improvement in the diagnosis accuracy and efficiency, a mixed-domain state features data based hybrid fault diagnosis approach, which systematically blends both the statistical analysis approach and the artificial intelligence technology, is proposed in this work for rolling element bearings. For simplifying the fault diagnosis problems, the execution of the proposed method is divided into three steps, i.e., fault preliminary detection, fault type recognition and fault degree identification. In the first step, a preliminary judgment about the health status of the equipment can be evaluated by the statistical analysis method based on the permutation entropy theory. If fault exists, the following two processes based on the artificial intelligence approach are performed to further recognize the fault type and then identify the fault degree. For the two subsequent steps, mixed-domain state features containing time-domain, frequency-domain and multi-scale features are extracted to represent the fault peculiarity under different working conditions. As a powerful time-frequency analysis method, the fast EEMD method was employed to obtain multi-scale features. Furthermore, due to the information redundancy and the submergence of original feature space, a novel manifold learning method (modified LGPCA) is introduced to realize the low-dimensional representations for high-dimensional feature space. Finally, two cases with 12 working conditions respectively have been employed to evaluate the performance of the proposed method, where vibration signals were measured from an experimental bench of rolling element bearing. The analysis results showed the effectiveness and the superiority of the proposed method of which the diagnosis thought is more suitable for practical application. Copyright © 2016 ISA. Published by Elsevier Ltd. All rights reserved.

  7. The Design and Implementation of a Remote Fault Reasoning Diagnosis System for Meteorological Satellites Data Acquisition

    Directory of Open Access Journals (Sweden)

    Zhu Jie

    2017-01-01

    Full Text Available Under the background of the trouble shooting requirements of FENGYUN-3 (FY-3 meteorological satellites data acquisition in domestic and oversea ground stations, a remote fault reasoning diagnosis system is developed by Java 1.6 in eclipse 3.6 platform. The general framework is analyzed, the workflow is introduced. Based on the system, it can realize the remote and centralized monitoring of equipment running status in ground stations,triggering automatic fault diagnosis and rule based fault reasoning by parsing the equipment quality logs, generating trouble tickets and importing expert experience database, providing text and graphics query methods. Through the practical verification, the system can assist knowledge engineers in remote precise and rapid fault location with friendly graphical user interface, boost the fault diagnosis efficiency, enhance the remote monitoring ability of integrity operating control system. The system has a certain practical significance to improve reliability of FY-3 meteorological satellites data acquisition.

  8. Preliminary evaluation of operational parameters in fixed x-ray diagnostics equipment

    International Nuclear Information System (INIS)

    Bacelar, Alexandre; Oliveira, Sandro Soletti de; Streck, Elaine E.; Furtado, Alvaro Porto Alegre; Pinto, Ana Lucia Acosta

    1998-01-01

    In this work they were appraised 22 fixed X-ray diagnostic equipment belonging to three great medical institutions in Porto Alegre - RS, Brazil, with the purpose of demonstrating the importance of the implementation of a Quality Warranty program, advised by a health physicist, in the performance of these equipment. For so some data of alignment and collimation of the beam, peak tube voltage, tube current, transportable charge and exposition time were collected. The results of the tests showed that in only one of the institutions all the equipment remained in operationally acceptable conditions, with relative percent errors below 10%, concerning to the analyzed parameters. This study also showed that the performance of the equipment of the three analyzed institutions is a direct reflex of the maintenance of a Quality Warranty Program, advised by a qualified professional. (author)

  9. Underground coal mining - methods, equipment developments and trends

    Energy Technology Data Exchange (ETDEWEB)

    Singhal, R

    1988-12-01

    Underground mines are truly beginning to accept the so-called 'high tech' technology evident in other industries. Automation, remote control and robotics have taken an added significance. Wireless communication, mine-wide equipment health and performance monitoring, and transmission of data from deeper levels to surface is moving towards becoming the norm. There is emphasis on developing and applying continuous mining systems, as well as on modifying cyclical discontinuous methods to continuous systems. Multi-purpose equipment is also being developed. Technology transfer is playing its role - equipment and systems from surface coal mining are being applied to underground mining and vice-versa. At the American Mining Congress Exhibition held in Chicago in April 1988, a variety of equipment for underground mining was displayed including coal face equipment such as shearer loaders, conveyors and powered supports, and equipment for room-and-pillar coal mining. The trend continues to be towards high power machines equipped with a variety of electronics and sensors, safety devices, and alarm systems. Ancillary equipment on display covered a variety of cutting drums, cutting tools, conveying equipment and so on. In room-and-pillar mining, the overall emphasis was on moving away from the cyclical nature of the work. Transportation by shuttle cars must be replaced by continuous transport systems such as conveyors. Experience from Australia has shown that the application of continuous haulage and breaker line supports has permitted a doubling of production from room-and-pillar systems. Production levels of 3,000tpd have already been achieved, and 4,000tpd is considered achievable.

  10. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  11. Diagnostic performance of combined single photon emission computed tomographic scintimammography and ultrasonography based on computer-aided diagnosis for breast cancer

    International Nuclear Information System (INIS)

    Hwang, Kyung Hoon; Choi, Duck Joo; Choe, Won Sick; Lee, Jun Gu; Kim, Jong Hyo; Lee, Hyung Ji; Om, Kyong Sik; Lee, Byeong Il

    2007-01-01

    We investigated whether the diagnostic performance of SPECT scintimammography (SMM) can be improved by adding computer-aided diagnosis (CAD) of ultrasonography (US). We reviewed breast SPECT SMM images and corresponding US images from 40 patients with breast masses (21 malignant and 19 benign tumors.) The quantitative data of SPECT SMM were obtained as the uptake ratio of lesion to contralateral normal breast. The morphologic features of the breast lesions on US were extracted and quantitated using the automated CAD software program. The diagnostic performance of SPECT SMM and CAD of US alone was determined using receiver operating characteristic (ROC) curve analysis. The best discriminating parameter (D-value) combining SPECT SMM and the CAD of US was created. The sensitivity, specificity and accuracy of combined two diagnostic modalities were compared to those of a single one. Both SPECT SMM and CAD of US showed a relatively good diagnostic performance (area under curve=0.846 and 0.831, respectively). Combining the results of SPECT SMM and CAD of US resulted in improved diagnostic performance (area under curve=0.860), but there was no statistical difference in sensitivity, specificity and accuracy between the combined method and a single modality. It seems that combining the results of SPECT SMM and CAD of breast US do not significantly improve the diagnostic performance for diagnosis of breast cancer, compared with that of SPECT SMM alone. However, SPECT SMM and CAD of US may complement each other in differential diagnosis of breast cancer

  12. Equipment performance and radiation protection status in X-ray fluoroscopy units in Sudan

    International Nuclear Information System (INIS)

    Ahmed, N. A.; Nayl, A. I.; Suliman, I. I.

    2012-01-01

    The number of fluoroscopy and fluoroscopically guided procedures has been substantially growing in developing countries at the same time advanced and sophisticated equipment are used in some hospitals. However, radiation protection requirements are not necessarily well adopted. In this study nine fluoroscopy X-ray units in Sudan were examined for compliance with international standards. The tests included: beam quality, entrance surface air kerma, image quality and radiation field measurements. Staff radiation protection tools such as lead aprons and eye glasses were also visually examined to find out whether international recommendations were fulfilled and to determine the level of staff awareness. The measured peak tube voltage deviation exceeded the recommended tolerance level in 30 % of the measurements. The results of patient doses measurements exceeded the recommended reference dose levels in 43 % of the measurements; however image quality and radiation field generally fulfilled the requirements for most units. The study revealed that a considerable number of fluoroscopy units were not performing according to the international standards and highlights the need of optimisation of radiation protection. (authors)

  13. Renewal of handling and storage equipment in wholesale company

    Directory of Open Access Journals (Sweden)

    Tânia Brasileiro Azevedo Teixeira

    2015-06-01

    Full Text Available This paper presents a use of methodology for renewing handling and storage equipment in a wholesale company. It is based on equipment maintenance, downtime and possession costs. With the analysis performed,, it was possible to make some suggestions for an optimal economic point for pallets replacement. The methodology is based on mathematical and economic principles in order to provide the organization with an increase in productivity and costs reduction for handling and storage equipment. As a result of the use of methodology, the conclusion that it was possible to consider that this point is obtained when the total annual cost is equal to the average total cost was reached. Therefore, the equilibrium point is achieved when the equipment usage time is six years.

  14. Nuclear medicine. In vivo diagnosis, PET not included

    International Nuclear Information System (INIS)

    Herain, C.; Machacek, C.; Menechal, P.; Aubert, B.; Rehel, J.L.; Vidal, J.P.; Biau, A.; Barbe, R.; Lahaye, T.; Gauron, C.; Barret, C.; Donnarieix, D.; Gambini, D.; Gondran, C.; Guerin, C.; Marande, J.L.; Mercier, J.; Paycha, F.; Pierrat, N.

    2011-12-01

    This document deals with radiation protection measures and practices in the medical sector, more particularly when performing in vivo diagnosis in nuclear medicine. It indicates the concerned personnel, the procedure process, the associated hazards and the risks related to ionizing radiation (for sealed and unsealed sources). It describes how risk is to be assessed and exposure levels are to be determined (elements of risk assessment, delimitation of controlled and monitored areas, personnel classification). It presents the different aspects of a risk management strategy (risk reduction, technical measures for the premises, the installation, radioactive wastes, and for radioactive effluents, protection measures and equipment, training and information, prevention, treatment of incidents and dysfunctions). It describes the various aspects of medical monitoring (personnel, pregnant and breast feeding women, medical and post-occupational file, processing of anomalies and incidents). It presents how risk management is to be assessed, and briefly evokes other related risks. An appendix presents an example of a workstation study in case of nuclear medicine

  15. Regulation EM-GT-8. Guidance for quality control of mammography equipment

    International Nuclear Information System (INIS)

    2015-01-01

    Objective: To provide practical guidance of technical procedures for carrying out quality control in mammography equipment. Scope: This guide applies to mammography equipment. A number of methods which require the appointed instrumentation described, some of which can be implemented in radiology services own country given the low complexity of themselves and others that require specific equipment and can be performed by specialized groups external to these units. The guide does not constitute a mandatory, however, the parameters evaluated according to the tests described therein and their tolerances form the basis of regulations that establish the CCEEM about these teams. Overview: The success of mammographic studies depends on obtaining high-quality images combined with a low rate of patient dose. To ensure this objective the establishment of quality assurance programs on all aspects involving these services is necessary. This guide provides a number of quality control procedures aimed at x-ray equipment, which must be performed at least on an annual basis or when some maintenance occurs at x-ray equipment.

  16. 30 CFR 75.1909 - Nonpermissible diesel-powered equipment; design and performance requirements.

    Science.gov (United States)

    2010-07-01

    ... energy, or leakage; (4) Releases only by a manual control that does not operate any other equipment...; and (xi) A water separator and fuel filter(s) must be provided. (4) A sensor to monitor the..., and accelerator pedals, controls which are of automobile orientation; (4) An audible warning device...

  17. Procuring, maintaining and using equipment: the key issues in controlling exposure to patients

    International Nuclear Information System (INIS)

    Hendra, I.R.F.

    1989-01-01

    Not only are acceptance criteria directly related to the design of medical x-ray equipment and quality assurance exercised during its manufacture, but also its performance, safety and reliability must feature in requirements for procuring new equipment. In the UK this issue is dealt with under the Department of Health and Social Security Manufacturer Registration Scheme for Medical Equipment in its application to radiological equipment. In the UK quality of maintenance services has been considered by one of our Working Parties commissioned by the South-East Thames Regional Health Authority who are the ''Centre of Responsibility'' for diagnostic imaging equipment in the National Health Service. The report prepared from the first phase of activity of this working group describes features of a procurement specification for maintenance services and prescribes complementary duties of contractors and customers. Radiograph reject analysis has indicated human error outweighs unsatisfactory equipment performance as the reason for rejecting poor radiographs. The use in X-ray departments of the kind of manufacturing quality system used by most reputable equipment manufacturers has the potential for a dramatic reduction in exposure. (author)

  18. Daya Bay Nuclear Power Station equipment reliability management system innovation

    International Nuclear Information System (INIS)

    Gao Ligang; Wang Zongjun

    2006-01-01

    Daya Bay Nuclear Power Station has achieved good performance since its commercial operation in 1994. The equipment reliability management system that features Daya Bay characteristics has been established through constant technology introduction, digestion and innovation. It is also based on the success of operational system, equipment maintenance system and technical support system. The system lays a solid foundation for the long-term safe operation of power station. This article emphasizes on the innovation part of equipment reliability management system in Daya Bay. (authors)

  19. Riser equipment decontamination engineering task plan; TOPICAL

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  20. Radioimmunoassay for medical diagnosis and research

    Energy Technology Data Exchange (ETDEWEB)

    Dudley, R A; Vavrejn, B [International Atomic Energy Agency, Vienna (Austria). Div. of Life Sciences

    1982-12-01

    Health and disease in living systems depend on the dynamic interplay of thousands of biochemical substances occurring in living systems in concentrations ranging from parts per hundred to parts per billion or trillion. Radioimmunoassay (RIA) is a highly specific and sensitive technique for measuring the concentration of such biochemical substances. It represents one of the most dramatically expanding areas of medical diagnosis and research. Reviewed here is the recent progress on RIA, with emphasis on methodology and on its adaptation and application in developing countries. The number of biological substances (ligands) being assayed by RIA continues to expand. RIA is central to diagnosis, epidemiology and research. It has been successfully applied in the study of parasitic and infectious diseases. Introduction of RIA into developing countries, for which the Agency's help is sought and given, presents numerous problems: personnel, equipment, adaptability of techniques to local needs, and public support.

  1. Performance of Aspergillus PCR in cerebrospinal fluid for the diagnosis of cerebral aspergillosis.

    Science.gov (United States)

    Imbert, S; Brossas, J-Y; Palous, M; Joly, I; Meyer, I; Fekkar, A

    2017-11-01

    Cerebral aspergillosis is a rare but often fatal form of invasive aspergillosis that remains difficult to diagnose. The literature has shown the value of Aspergillus PCR in blood-derived samples for the diagnosis of invasive aspergillosis but provides far less information for cerebrospinal fluid (CSF) in cerebral aspergillosis. Here, we evaluated the usefulness of an Aspergillus PCR assay performed on CSF for the diagnosis of cerebral aspergillosis. This retrospective study involved 72 patients with suspected cerebral aspergillosis for a total of 88 CSF samples in whom CSF Aspergillus PCR was performed. Seventeen patients had proven/probable invasive aspergillosis according to the European Organization for Research and Treatment of Cancer/Mycoses Study Group criteria, including 12 cases of proven/probable cerebral aspergillosis. Aspergillus PCR in CSF was positive in nine of the twelve patients with cerebral aspergillosis, i.e. 75% sensitivity. In contrast, CSF culture was positive for Aspergillus in only two patients. In the non-cerebral aspergillosis group (60 patients), PCR was positive in one patient, i.e. 98.3% specificity. In this particular population of high-risk patients with suspicion of cerebral aspergillosis, the disease incidence was 16.7%. Therefore, the positive and negative predictive values of PCR were 90% and 95.2%, respectively. The results of this study indicate that Aspergillus PCR in CSF is an interesting tool that may eliminate the need for cerebral biopsy in patients with suspected cerebral aspergillosis. Copyright © 2017 European Society of Clinical Microbiology and Infectious Diseases. Published by Elsevier Ltd. All rights reserved.

  2. Methodology development for availability improvement of standby equipment

    International Nuclear Information System (INIS)

    Shin, Sung Min; Jeon, In Seop; Kang, Hyun Gook

    2014-01-01

    The core damage frequency (CDF) of operating and constructing pressurized nuclear plants are ranging on the order of 10 -5 and 10 -6 per year. The target CDF of new NPP design has been set at 10 -7 . In this context, although various systems are currently studied, availability improvement of standby equipment will be more efficient than the additional application of safety systems. It is obvious in every aspect, such as management and cost efficiency. Here, soundness can affect equipment unavailability, and the soundness degrades because of aging. However, some studies did not consider aging when calculating the unavailability. Standby equipment can age because of two important factors: standby stress which accumulates over time, and test stress which accumulates with the number of tests (or operations). Both factors should be considered together when aging is considered. However, some studies only considered standby stress or test stress. There are some previous studies which considered both factors. Besides equipment soundness related to aging effect, some process like bypass during test also can affect equipment unavailability because the original function of equipment cannot be performed immediately during this process. However, there are seldom studies dealing with above factors as a whole problem. This study investigated a general approach to calculate the unavailability of standby equipment which considers aging caused by standby and test stresses and bypass process. Based on this general approach, we propose two maintenance strategies which aim to reduce standby equipment unavailability. In section 2, the general approach is presented. As one of the strategies, the changing test interval method (CIM) is introduced in section 3, and its effectiveness is also analyzed. The online monitoring method (OMM) is investigated in section 4 as another method to reduce equipment unavailability. In section 5, a combination of these two methods is analyzed. A general

  3. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  4. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  5. Electron Beam Diagnosis and Dynamics using DIADYN Plasma Source

    Energy Technology Data Exchange (ETDEWEB)

    Toader, D; Craciun, G; Manaila, E; Oproiu, C [National Institute of Research for Laser, Plasma and Radiation Physics Bucuresti (Romania); Marghitu, S [ICPE Electrostatica S.A - Bucuresti (Romania)

    2009-11-15

    This paper is presenting results obtained with the DIADYN installation after replacing its vacuum electron source (VES{sub L}V) with a plasma electron source (PES{sub L}V). DIADYN is a low energy laboratory equipment operating with 10 to 50 keV electron beams and designed to help realize non-destructive diagnosis and dynamics for low energy electron beams but also to be used in future material irradiations. The results presented here regard the beam diagnosis and dynamics made with beams obtained from the newly replaced plasma source. We discuss both results obtained in experimental dynamics and dynamics calculation results for electron beams extracted from the SEP{sub L}V source.

  6. Special servicing equipment for reactor pressurized vessel stud hole and stud accessories

    International Nuclear Information System (INIS)

    Li Jianglian

    1999-01-01

    The author briefly introduces the design and manufacture of nuclear island special servicing equipment of Nuclear Power Institute of China. Maintenance process of reactor pressurized vessel (RPV) stud hold and stud accessories the special servicing equipment include RPV flange dummy, closed-circuit television (CCTV) inspection equipment, RPV stud hole expandable comb, RPV stud hole polisher, RPV stud hold thread lubricating equipment, RPV stud hole thread miller and RPV stud hole camera. It is presented how eight kinds of special servicing equipment perform the maintenance process concerning their function, structure, and characteristics, their practical use on site is also introduced

  7. A Perspective on Equipment Design for Fusion Remote Handling

    International Nuclear Information System (INIS)

    Mills, S.; Haist, B.; Hamilton, D.

    2006-01-01

    basis. To foresee and therefore prevent equipment failure technologies such as online condition monitoring and self-diagnosis will be essential. The economics of future fusion projects will demand that commercial off-the-shelf equipment be used in the remote handling system wherever possible and that the integration and support of the systems are as simple as possible. The modularization and standardisation of components and software is therefore essential. The paper will discuss possible methods for addressing these needs of the preparation, maintenance and support of remote operations. If ignored, this aspect has significant potential to inflate costs and reduce operational effectiveness. The paper will also discuss innovations and developments which have the potential for improving some of the key technologies required for fusion machines such as in pipe joining techniques and actuator developments. (author)

  8. Seismic qualification method of equipment for nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J.S.; Choi, T.H.; Sulaimana, R.A.

    1995-01-01

    Safety related equipment installed in Korean Nuclear Power Plants are required to perform a safety function during and after a seismic event. To accomplish this safety function, they must be seismically qualified in accordance with the intent and requirements of the USNRC Reg. Guide 1.100 Rev. 02 and IEEE Std. 344-1987. This paper defines and summarizes acceptable criteria and procedures, based on the Korean experience, for seismic qualification of purchased equipment to be installed in a nuclear power plant. As such the paper is intended to be a concise reference by equipment designers, architectural engineering company and plant owners in uniform implementation of commitments to nuclear regulatory agencies such as the USNRC or Korea Institute of Nuclear Safety (KINS) relating to adequacy of seismic Category 1 equipment. Thus, the paper provides the methodologies which can be used for qualifying equipment for safely related service in Nuclear Power Plants in a cost effective manner

  9. Design guide for heat transfer equipment in water-cooled nuclear reactor systems

    International Nuclear Information System (INIS)

    1975-07-01

    Information pertaining to design methods, material selection, fabrication, quality assurance, and performance tests for heat transfer equipment in water-cooled nuclear reactor systems is given in this design guide. This information is intended to assist those concerned with the design, specification, and evaluation of heat transfer equipment for nuclear service and the systems in which this equipment is required. (U.S.)

  10. Apollo experience report: Development flight instrumentation. [telemetry equipment for space flight test program

    Science.gov (United States)

    Farmer, N. B.

    1974-01-01

    Development flight instrumentation was delivered for 25 Apollo vehicles as Government-furnished equipment. The problems and philosophies of an activity that was concerned with supplying telemetry equipment to a space-flight test program are discussed. Equipment delivery dates, system-design details, and flight-performance information for each mission also are included.

  11. Design of EPON far-end equipment based on FTTH

    Science.gov (United States)

    Feng, Xiancheng; Yun, Xiang

    2008-12-01

    Now, most favors fiber access is mainly the EPON fiber access system. Inheriting from the low cost of Ethernet, usability and bandwidth of optical network, EPON technology is one of the best technologies in fiber access and is adopted by the carriers all over the world widely. According to the scheme analysis to FTTH fan-end equipment, hardware design of ONU is proposed in this paper. The FTTH far-end equipment software design deference modulation design concept, it divides the software designment into 5 function modules: the module of low-layer driver, the module of system management, the module of master/slave communication, and the module of main/Standby switch and the module of command line. The software flow of the host computer is also analyzed. Finally, test is made for Ethernet service performance of FTTH far-end equipment, E1 service performance and the optical path protection switching, and so on. The results of test indicates that all the items are accordance with technical request of far-end ONU equipment and possess good quality and fully reach the requirement of telecommunication level equipment. The far-end equipment of FTTH divides into several parts based on the function: the control module, the exchange module, the UNI interface module, the ONU module, the EPON interface module, the network management debugging module, the voice processing module, the circuit simulation module, the CATV module. In the downstream direction, under the protect condition, we design 2 optical modules. The system can set one group optical module working and another group optical module closure when it is initialized. When the optical fiber line is cut off, the LOS warning comes out. It will cause MUX to replace another group optical module, simultaneously will reset module 3701/3711 and will make it again test the distance, and will give the plug board MPC850 report through the GPIO port. During normal mode, the downstream optical signal is transformed into the

  12. Performance of an ELISA and Indirect Immunofluorescence Assay in Serological Diagnosis of Zoonotic Cutaneous Leishmaniasis in Iran

    Directory of Open Access Journals (Sweden)

    Bahador Sarkari

    2014-01-01

    Full Text Available Serological assays have been extensively evaluated for diagnosis of visceral leishmaniasis (VL and considered as a routine method for diagnosis of VL while these methods are not properly evaluated for diagnosis of cutaneous leishmaniasis (CL. This study aimed to assess the performance of indirect immunofluorescent-antibody test (IFA and enzyme-linked immunosorbent assay (ELISA for serodiagnosis of cutaneous leishmaniasis in Iran. Sixty-one sera samples from parasitologically confirmed CL patients and 50 sera from healthy controls along with 50 sera from non-CL patients were collected. Antigen was prepared from promastigotes and amastigotes of Leishmania major. IFA was used to detect anti-Leishmania IgG while ELISA was used to detect anti-Leishmania IgM, total IgG, or IgG subclasses (IgG1 and 4. ELISA, for detection of total IgG and IgM, showed sensitivity of 83.6% and 84.7% and specificity of 62.7% and 54.6%, respectively. Sensitivity and specificity of ELISA for detecting IgG1 and IgG4 were 64%, 75% and 85%, 49%, respectively. Sensitivity and specificity of IFA were 91.6% and 81%. Conclusion. Findings of this study demonstrated that serological test, especially IFA, can be used for proper diagnosis of CL.

  13. Outcomes of a Cross-Disciplinary Concussion Prevention and Diagnosis Workshop Series

    Directory of Open Access Journals (Sweden)

    Patrick Drane

    2018-02-01

    Full Text Available This paper reports the outcomes of a series of two Concussion Research Workshops held in Lowell, MA, USA. The workshop examined the state-of-the-art in concussion research, research challenges and the future directions of research within the following three core topic areas: (A Concussion Prevention Techniques & Technology, (B Concussion Diagnosis, and (C Treatment of Concussions. Concussions are a form of traumatic brain injury caused by an impact and are a growing concern among athletes and those who are involved with sports. Recent years have led to increasing awareness and research related to concussions with limited definitive understanding of the specific mechanism and pathology. Technology is beginning to take on an important role in the prevention, diagnosis and treatment of concussions. Currently, sensors provide data about the impact and the athlete. However, sensors and better protective equipment can enable an effective monitoring and thus protection of athletes. Only when a more definitive understanding of the injury mechanism is achieved, can sensors and protective equipment design contribute to effective monitoring and protection of athletes.

  14. Equipment for oral surgery in small animals.

    Science.gov (United States)

    Reiter, Alexander M

    2013-05-01

    This article provides an overview of equipment used for oral surgery. Specific instruments and materials used when performing relevant operative procedures are also mentioned in other articles in this issue. Copyright © 2013 Elsevier Inc. All rights reserved.

  15. The manager and equipment decisions: is that in the capital budget?

    Science.gov (United States)

    McConnell, C R

    2001-06-01

    Although any decision to purchase a piece of capital equipment involves a number of the organization's functions, the department manager has some significant responsibilities in the selection and acquisition of capital equipment. Except for unavoidable replacement of essential equipment that fails unexpectedly, capital purchases must ordinarily be planned in advance through the annual budgeting process. The department manager is ordinarily the organization's primary source of information in major capital expenditure projects; therefore, it is essential that the manager follow a logical process for identifying and evaluating alternative equipment choices and perform a consistent economic analysis of the alternatives.

  16. Quality control of diagnostic x-ray equipment and film processing

    International Nuclear Information System (INIS)

    1993-01-01

    According to the section 40 of the Radiation Act (592/92), the licensee is required in Finland to make the arrangements to control the function of the radiation equipment and related facilities used for medical procedures. The guide explains how quality control can be organized for diagnostic x-ray equipment. It also gives recommendations for constancy tests for conventional x-ray radiographic and fluoroscopic equipment and for film processing. The recommendations are based on the publications and statements of the International Committee for Radiation Protection (ICRP) and standardization organizations. The intention is that the operators of x-ray equipment or the maintenance personnel are able to perform the quality control tests presented in the guide

  17. Planning of maintenance of electrical equipment in nuclear plants/laboratories [Paper No.: VB-3

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Bhattacharyya, A.K.

    1981-01-01

    Satisfactory operating performance of electrical systems ensures continuous availability of power to the various plants and machinery in nuclear plant and laboratories. For effective optimal functioning of the electrical equipment and to reduce their down time, scheduled planning of maintenance to the equipment is essential. Maintenance of power plant, nuclear or fossil, and industrial plant and research laboratories demands essential ingredients such as right type of trained and motivated technical personnel, adoption of standard procedures for maintenance, adequate safety and protection for equipment, safety procedures adopted in the installation to prevent hazards to the workers, provision of adequate stores and inventories, facilities for quick repairs and testing of equipment and effective planning of procedures for their maintenance. While breakdown maintenance allows equipment to operate before it is repaired or replaced, preventive maintenance makes use of scheduled inspection and periodical equipment overhaul and has little value for predicting future continuous performances of equipment. The engineered maintenance is most advantageous and offers maximum operating time to reduce down time of the equipment while adding predictive testing technique to aid in determining the frequency of overhaul of equipment. The important checks to be conducted and preventive maintenance programme to be scheduled are discussed in this paper. The safety and reliable functioning of the electrical equipment depend on proper optimal design, selection of equipment, their installation, subsequent maintenance and strict compliance with safety regulations. (author)

  18. New expert system approach for the design of a diagnosis tool in a production plant

    Science.gov (United States)

    Mouss, H.; Mouss, D.; Scholz Reiter, B.

    2001-10-01

    The search for an increase in quality and speed of the diagnosis led to the reduction in the unavailability times of the production equipment. Thus, among the objectives of this study, need for operating on the level of the industrial sector of production through making of tools of assistance to the diagnosis of the abnormal operations, which are integrated into the environment of the system and allow the optimization of intervention times.

  19. Fault detection and diagnosis for smart buildings

    DEFF Research Database (Denmark)

    Lazarova-Molnar, Sanja; Shaker, Hamid Reza; Mohamed, Nader

    2016-01-01

    in the BMS components that can affect the energy efficiency of a building, as well as review the methods that can be utilized for their discovery and diagnosis. The goal of the paper is to highlight the challenges that lie in this problem domain, as well as provide a strategy how to counterfeit them.......Worldwide, buildings account for ca. 40% of the total energy consumption and ca. 20% of the total CO2 emissions. While most of the energy goes into primary building use, a significant amount of energy is wasted due to malfunctioning building system equipment and wrongly configured Building...... Management Systems (BMS). For example, wrongly configured setpoints or building equipment, or misplaced sensors and actuators, can contribute to deviations of the real energy consumption from the predicted one. Our paper is motivated by these posed challenges and aims at pinpointing the types of problems...

  20. Clinical application and progress of PET and PET-CT for differential diagnosis of the benign or malignant pulmonary nodules

    International Nuclear Information System (INIS)

    Wang Xuemei; Wang Meiling; Wang Xiangcheng

    2010-01-01

    To differential diagnosis the benign or malignant of pulmonary nodules is a medical difficult problem. As the development of medical imaging equipment and technology, PET-CT can identified benign or malignant lesions of pulmonary nodules though changes of metabolism. Researches about PET-CT for differential diagnosis pulmonary nodules benign or malignant are reviewed. (authors)

  1. Performance simulation of the JPL solar-powered distiller. Part 1: Quasi-steady-state conditions. [for cooling microwave equipment

    Science.gov (United States)

    Yung, C. S.; Lansing, F. L.

    1983-01-01

    A 37.85 cu m (10,000 gallons) per year (nominal) passive solar powered water distillation system was installed and is operational in the Venus Deep Space Station. The system replaced an old, electrically powered water distiller. The distilled water produced with its high electrical resistivity is used to cool the sensitive microwave equipment. A detailed thermal model was developed to simulate the performance of the distiller and study its sensitivity under varying environment and load conditions. The quasi-steady state portion of the model is presented together with the formulas for heat and mass transfer coefficients used. Initial results indicated that a daily water evaporation efficiency of 30% can be achieved. A comparison made between a full day performance simulation and the actual field measurements gave good agreement between theory and experiment, which verified the model.

  2. Survey on quality control measurements for nuclear medicine imaging equipment in Finland in 2006

    International Nuclear Information System (INIS)

    Korpela, Helinae; Niemelae, Jarkko

    2008-01-01

    Routine quality control (QC) is an essential requirement in nuclear medicine (NM) in order to ensure optimal functioning of equipment. To harmonise the routine QC of NM imaging equipment in Finnish hospital s (planar gamma cameras, SPECT, coincidence gamma cameras, PET), the Radiation and Nuclear Safety Authority (STUK) will publish guidelines on QC in collaboration with several hospital physicists. Recommendations will be provided on routine QC measurements and on the frequency of testing. It is also planned to provide recommendations for the acceptance criteria when assessing different performance parameters for NM imaging equipment. In order to determine what performance parameters of NM equipment are currently measured in hospitals, how frequently they are measured and what acceptance criteria are used, a survey was carried out on the QC of NM equipment in Finland during 2006. (author)

  3. Rapid and point-of-care tests for the diagnosis of Trichomonas vaginalis in women and men.

    Science.gov (United States)

    Gaydos, Charlotte A; Klausner, Jeffrey D; Pai, Nitika Pant; Kelly, Helen; Coltart, Cordelia; Peeling, Rosanna W

    2017-12-01

    Trichomonasvaginalis (TV) is a highly prevalent parasitic infection worldwide. It is associated with many adverse reproductive health outcomes. Many infections are asymptomatic and syndromic management leads to underdetection of TV. Traditional methods of TV detection such as wet preparation are insensitive. New rapid, point-of-care (POC) tests can enhance the diagnosis of trichomoniasis. The authors reviewed the literature and discuss older POC tests for TV detection, as well as the OSOM lateral flow test, the AmpliVue test, the Solana test and the GeneXpert test as well as the limitations of wet preparation and culture for detection of TV. The OSOM test is easy to perform, compared with other POC tests, and is Clinical Laboratory Improvement Amendments (CLIA)-waived, equipment-free, has sensitivities of 83%-86% compared with nucleic acid amplification tests (NAATs) and can be performed in 15 min. The AmpliVue and the Solana tests are not CLIA waived and require small pieces of equipment. They are molecular amplified assays and can be completed in TV test for women and men is a moderately complex test, requires a small platform and can be performed in women and one is available for detection of TV in men. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  4. Investigation of the imaging diagnosis on the ophthalmic orbital diseases

    International Nuclear Information System (INIS)

    Yoshizawa, Toshikazu

    1991-01-01

    Ultrasonographic examination, X-ray computerized tomography (CT) and magnetic resonance imaging (MRI) were performed on orbital diseases. Ultrasonographic examination was a simple, rapid and harmless noninvasive precedure as a diagnostic tool for evaluation of soft tissues. Echography was not more precise than X-ray CT and MRI scan in orbital diagnosis of the localization, size and well-defined outline of the lesion, relating to the peri- and retroorbital organs, however, was useful for screening study of an orbital lesion. B-mode of orbital tumors was effective for the ultrasonic diagnosis and classification according to four types; solid, cystic, angiomatous and infiltrative patterns. B-scan study of intraorbital inflammatory pseudo tumor could provide a differential diagnosis between inflammatory edema and an inflammatory mass lesion. Echographic pictures of dural arterio-venous fistula disclosed the vascular dilatation of superior ophthalmic vein and those of Basedow's disease with thickening of extraocular muscles. X-ray CT revealed intraorbital and intraocular disease, the globes and its immediate surrounding tissue (optic nerve, extraocular muscle, etc.) and bony orbital walls as the same slice of film. X-ray CT pictures of a coronal section, the contrast enhancement, calcification and destruction of the bone were helpful for diagnosis. However, the displays of disorders near the bone were ill-defined because of an artifact induced by high X-ray absorptive power of the bone. MRI was an equipment for superior contrast resolution, with provided a tomography of any section, without artifacts of the bone, and was the superior technique for displaying a vascular lesion. MRI of orbital disease was effective for reconstructing the spatial correlations between the lesion and its surounding tissues. MRI, however, provided no information of the skeleton, being not available for subjects with a magnetic substance. (author)

  5. A Computerized Procedure linked to Virtual Equipment

    International Nuclear Information System (INIS)

    Jung, Yeon Sub; Song, Tae Young

    2011-01-01

    Digital, information, and communication technologies have change human's behavior. This is because human has limitation to memorize and process information. Human has to access other information and real time information for important decisions. Those technologies are playing important roles. Nuclear power plants cannot be exception. Many accidents in nuclear power plants result from absent or incorrect information. The information for nuclear personnel is context sensitive. They don't have enough time to verify the context sensitive information. Therefore they skip the information, as resulting in incident. Nuclear personnel are usually carrying static paper procedures during local task performance. The procedure guides them steps to follow. There is, however, no dynamic and context sensitive information in the paper. The effect of the work is evaluated once while getting permission of the work. Afterward they are not informed. The static paper is generally simplified, so that it does not show detail of equipment being manipulated. Particularly novice workers feel difficult to understand the procedure due to lack of detail. Pictures of equipment inserted in the procedure are not enough for comprehension. A computerized procedure linked with virtual equipment is one of the best solutions to increase the detail of procedure. Virtual equipment, however, has still limitation not to provide real time information, because the virtual equipment is not synchronized with real plants

  6. IEEE standard for design qualification of safety systems equipment used in nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This standard is written to serve as a general standard for qualification of all types of safety systems equipment, mechanical and instrumentation as well as electrical. It also establishes principles and procedures to be followed in preparing specific safety systems equipment standards. Guidance for qualifying specific safety systems equipment may be found in various specific equipment qualification standards that are now available or are being prepared. It is required that safety systems equipment in nuclear power generating stations meet or exceed its performance requirements throughout its installed life. This is accomplished by a disciplined program of design qualification and quality assurance of design, production, installation, maintenance and surveillance. This standard is for the design qualification section of the program only. Design qualification is intended to demonstrate the capability of the equipment design to perform its safety function(s) over the expected range of normal, abnormal, design basis event, post design basis event, and in-service test conditions. Inherent to design qualification is the requirement for demonstration, within limitations afforded by established technical state-of-the-art, that in-service aging throughout the qualified life established for the equipment will not degrade safety systems equipment from its original design condition to the point where it cannot perform its required safety function(s), upon demand. The above requirement reflects the primary role of design qualification to provide reasonable assurance that design- and age-related common failure modes will not occur during performance of safety function(s) under postulated service conditions

  7. Method research of fault diagnosis based on rough set for nuclear power plant

    International Nuclear Information System (INIS)

    Chen Zhihui; Xia Hong

    2005-01-01

    Nuclear power equipment fault feature is complicated and uncertain. Rough set theory can express and deal with vagueness and uncertainty, so that it can be introduced nuclear power fault diagnosis to analyze and process historical data to find rule of fault feature. Rough set theory treatment step: Data preprocessing, attribute reduction, attribute value reduction, rule generation. According to discernibility matrix definition and nature, we can utilize discernibility matrix in reduction algorithm that make attribute and attribute value reduction, so that it can minish algorithmic complication and simplify programming. This algorithm is applied to the nuclear power fault diagnosis to generate rules of diagnosis. Using these rules, we have diagnosed five kinds of model faults correctly. (authors)

  8. Quality of mammography equipment in Health Public Network; Calidad de proceso generador de imagenes mamograficas de equipos instalados en la Red Publica de Salud

    Energy Technology Data Exchange (ETDEWEB)

    Ruberti Filha, E. M.; Pires, S. R.; Medeiros, R. B.

    2006-07-01

    In spite of the requirements of the Brazilian Regulatory Organization to ensure that quality control verifications are made in the radiological equipment, further actions should also be carried out in order to guarantee the quality of the images and of the diagnosis. This study has as its objective to analyze the failures of the image generation system using instruments to control the quality of the radiological equipment, verify the processing image conditions and, finally, classify the mammographic findings as unacceptable, suitable and acceptable. A statistical phantom was used in which the fibers and the microcalcifications were randomly positioned. The images were then read by specialists and the level of agreement was measured by the Kappa value. It was possible to check that most of the tested equipment parameters presented a good performance, although the film processing did not generate satisfactory results and caused reading difficulties. Many of the results of these reading were classified as unacceptable. Among these images, only a small percentage of them presented the fibers and microcalcifications of the sizes required by the Brazilian legislation. We concluded that it is only possible to generate good quality images if all the steps of the process are properly controlled. Therefore, it is relevant to invest in training, calibration and maintenance of the mammographic equipment. (Author)

  9. Confiança e Desempenho de Equipes [doi: 10.5329/RECADM.2013005

    Directory of Open Access Journals (Sweden)

    João Bosco Castro Araujo

    2013-04-01

    Full Text Available Este artigo teve como objetivo analisar como a confiança se relaciona com o desempenho de equipes. Entende-se confiança como uma relação entre duas ou mais partes, na qual há expectativa mútua do cumprimento do que foi combinado; e alto desempenho, o atingimento ou superação das metas estabelecidas. Foi realizado um estudo de caso de caráter qualitativo, em uma empresa do setor de construção civil, a partir da seleção intencional de uma equipe de alto desempenho (Equipe Alfa e outra de baixo desempenho (Equipe Beta. A coleta de dados foi realizada por meio de análise documental, de entrevistas individuais e de observação de reunião. Os resultados indicaram que a Equipe Alfa demonstrou comportamentos relativos à confiança transacional e transformadora, encontrando-se no estágio de realização; apresenta disposição para desenvolver-se, correr riscos, inovar e melhorar; e alto desempenho em termos do atingimento das metas propostas. A Equipe Beta apresentou comportamentos mais relacionados à confiança transacional, encontrando-se no estágio de formação; apresenta disposição para consistência, compromisso e capacidade; e baixo desempenho. Esses resultados indicam que há uma relação entre a confiança transacional e transformadora e o alto desempenho em equipes.   Palavras-chave: Confiança; Confiança transformadora; Confiança transacional; Equipes de alto desempenho; Relações intraequipes.     TRUST AND TEAM PERFORMANCE   ABSTRACT This paper aimed to analyze the relationship between trust and teams performance. Trust is understood as a relation between two or more parties, with a mutual expectation to fulfill what was defined by the parties; and high performance is the reaching or the overcoming of the established goals. We realized a qualitative case study in a company of the civil construction sector. We intentionally selected one high performance team (Alfa team and another low performance team (Beta team

  10. Bacteriological research for the contamination of equipment in chest radiography

    International Nuclear Information System (INIS)

    Choi, Seung Gu; Song, Woon Heung; Kweon, Dae Cheol

    2015-01-01

    The purpose is to determine the degree of contamination of the equipment for infection control in chest radiography of the radiology department. We confirmed by chemical and bacterial identification of bacteria of the equipment and established a preventive maintenance plan. Chest X-ray radiography contact area on the instrument patients shoulder, hand, chin, chest lateral radiography patient contact areas with a 70% isopropyl alcohol cotton swab were compared to identify the bacteria before and after sterilization on the patient contact area in the chest radiography equipment of the department. The gram positive Staphylococcus was isolated from side shoots handle before disinfection in the chest radiography equipment. For the final identification of antibiotic tested that it was determined by performing the nobobiocin to the sensitive Staphylococcus epidermidis. Chest radiography equipment before disinfecting the handle side of Staphylococcus epidermidis bacteria were detected using a disinfectant should be to prevent hospital infections

  11. Bacteriological research for the contamination of equipment in chest radiography

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Seung Gu; Song, Woon Heung; Kweon, Dae Cheol [Shinhan University, Uijeongbu (Korea, Republic of)

    2015-12-15

    The purpose is to determine the degree of contamination of the equipment for infection control in chest radiography of the radiology department. We confirmed by chemical and bacterial identification of bacteria of the equipment and established a preventive maintenance plan. Chest X-ray radiography contact area on the instrument patients shoulder, hand, chin, chest lateral radiography patient contact areas with a 70% isopropyl alcohol cotton swab were compared to identify the bacteria before and after sterilization on the patient contact area in the chest radiography equipment of the department. The gram positive Staphylococcus was isolated from side shoots handle before disinfection in the chest radiography equipment. For the final identification of antibiotic tested that it was determined by performing the nobobiocin to the sensitive Staphylococcus epidermidis. Chest radiography equipment before disinfecting the handle side of Staphylococcus epidermidis bacteria were detected using a disinfectant should be to prevent hospital infections.

  12. Can High-Performance Equipment Lead to a Low-Performance Building?

    Energy Technology Data Exchange (ETDEWEB)

    Jonlin, Duane; Thornton, Brian A.; Rosenberg, Michael I.

    2016-08-22

    The performance-based compliance alternative available in most energy codes, intended to provide energy efficiency equivalent to that of prescriptive compliance while allowing innovation and design flexibility, can instead result in sub-standard energy performance in both the short and the long term. The potential deficiencies in modeled buildings originate with subtleties in the energy modeling rules, allowing building systems that consume more energy than their real-world, prescriptively-designed counterparts. This performance gap is exacerbated over subsequent decades as less efficient permanent features of the building remain while elements with shorter lives are regularly upgraded in most buildings. This paper summarizes an investigation into the topic for Pacific Northwest National Laboratory and the City of Seattle, including identification of the principal deficiencies exploited in the modeling path, and several potential code amendments that could resolve these deficiencies and establish better equivalency between prescriptive and performance compliance paths. The study, focusing on Seattle and Washington State energy codes, offers lessons and implications for other jurisdictions and energy codes.

  13. A guide to qualification of electrical equipment for nuclear power plants. Final report, November 1983

    International Nuclear Information System (INIS)

    Marion, A.; Lamken, D.; Harrall, T.; Kasturi, S.; Holzman, P.; Carfagno, S.; Thompson, D.; Boyer, B.; Hanneman, H.; Rule, W.

    1983-09-01

    Equipment qualification demonstrates that nuclear power plant equipment can perform its safety function - that despite age or the adverse conditions of a design basis accident the equipment can work as needed. This report is a guide to the overall process of electrical equipment qualification. It should interest those who design such equipment, those who buy it, or test it, and even those who install and maintain it. (author)

  14. Parasite-based malaria diagnosis: are health systems in Uganda equipped enough to implement the policy?

    Science.gov (United States)

    Kyabayinze, Daniel J; Achan, Jane; Nakanjako, Damalie; Mpeka, Betty; Mawejje, Henry; Mugizi, Rukaaka; Kalyango, Joan N; D'Alessandro, Umberto; Talisuna, Ambrose; Jean-Pierre, Van geertruyden

    2012-08-24

    Malaria case management is a key strategy for malaria control. Effective coverage of parasite-based malaria diagnosis (PMD) remains limited in malaria endemic countries. This study assessed the health system's capacity to absorb PMD at primary health care facilities in Uganda. In a cross sectional survey, using multi-stage cluster sampling, lower level health facilities (LLHF) in 11 districts in Uganda were assessed for 1) tools, 2) skills, 3) staff and infrastructure, and 4) structures, systems and roles necessary for the implementing of PMD. Tools for PMD (microscopy and/or RDTs) were available at 30 (24%) of the 125 LLHF. All LLHF had patient registers and 15% had functional in-patient facilities. Three months' long stock-out periods were reported for oral and parenteral quinine at 39% and 47% of LLHF respectively. Out of 131 health workers interviewed, 86 (66%) were nursing assistants; 56 (43%) had received on-job training on malaria case management and 47 (36%) had adequate knowledge in malaria case management. Overall, only 18% (131/730) Ministry of Health approved staff positions were filled by qualified personnel and 12% were recruited or transferred within six months preceding the survey. Of 186 patients that received referrals from LLHF, 130(70%) had received pre-referral anti-malarial drugs, none received pre-referral rectal artesunate and 35% had been referred due to poor response to antimalarial drugs. Primary health care facilities had inadequate human and infrastructural capacity to effectively implement universal parasite-based malaria diagnosis. The priority capacity building needs identified were: 1) recruitment and retention of qualified staff, 2) comprehensive training of health workers in fever management, 3) malaria diagnosis quality control systems and 4) strengthening of supply chain, stock management and referral systems.

  15. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  16. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  17. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  18. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  19. Development of simple DSA equipment and experience of its using

    International Nuclear Information System (INIS)

    Yoshino, Fumiki; Matsuo, Michimasa.

    1984-01-01

    We manufactured a cheap and portable simple DSA equipment, consisting of an ordinary X-ray system and a microcomputer which is the hardware exclusively used for real-time processing. As the result of the basic clinical examination by simple DSA equipment, we found it effective on the follow-up study of diseases such as the arteriosclerosis obliterans. We performed the intra-arterial DSA with a catheter which was small in the inside diameter, to reduce its aggression, and at the same time we are trying its application to the functional image. In the future, it will show us the possibility of the routine screening examination at an out-patients' department. Compared with DSA equipment sold in the market, our simple DSA equipment is good enough to make diagnostic images in spite of the limited capacity of TV system. Moreover, our DSA equipment is cheap and portable, and is very effective for the follow-up study of diseases such as the arteriosclerosis obliterans. So we can say that simple DSA equipment is of excellent clinical value. (author)

  20. Endoscopic tissue diagnosis of cholangiocarcinoma.

    LENUS (Irish Health Repository)

    Harewood, Gavin C

    2008-09-01

    The extremely poor outcome in patients with cholangiocarcinoma, in large part, reflects the late presentation of these tumors and the challenging nature of establishing a tissue diagnosis. Establishing a diagnosis of cholangiocarcinoma requires obtaining evidence of malignancy from sampling of the epithelium of the biliary tract, which has proven to be challenging. Although endoscopic ultrasound-guided fine needle aspiration performs slightly better than endoscopic retrograde cholangiopancreatography in diagnosing cholangiocarcinoma, both endoscopic approaches demonstrate disappointing performance characteristics.

  1. Development of automatic ultrasonic testing equipment for reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Jang, Kee Ok; Park, Dae Yung; Park, Moon Hoh; Koo, Kil Mo; Park, Kwang Heui; Kang, Sang Sin; Bang, Heui Song; Noh, Heui Choong; Kong, Woon Sik [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-08-01

    The selected weld areas of reactor pressure vessel and adjacent piping are examined by remote mechanized ultrasonic testing(MUT) equipment. Since the MUT equipment was purchased from Southwest Research Institute (SwRI) in April 1985, we have performed 15 inservice inspections and 5 preservice inspections. However, the reliability of examination was recently decreased rapidly as the problems which results from the old age of equipment and the frequent movement to plant site to site have occurred frequently. Therefore, the 3-axis control system hardware in occurring many problems among the equipments of mechanized ultrasonic testing (MUT) was designed and developed to cover the examination areas of nozzle-shell weld as specified in ASME Code Section XI and to improve the examination reliability. The new 3-axis control system hardware with the performance of this project was developed to be compatible with the old one and it was used as dual system or spare parts of the old system. Furthermore, the established technologies are expected to be applied to the similar control systems in nuclear power plant. 17 figs, 2 pix, 2 tabs, 10 refs. (Author).

  2. Development of automatic ultrasonic testing equipment for reactor pressure vessel

    International Nuclear Information System (INIS)

    Jang, Kee Ok; Park, Dae Yung; Park, Moon Hoh; Koo, Kil Mo; Park, Kwang Heui; Kang, Sang Sin; Bang, Heui Song; Noh, Heui Choong; Kong, Woon Sik

    1994-08-01

    The selected weld areas of reactor pressure vessel and adjacent piping are examined by remote mechanized ultrasonic testing(MUT) equipment. Since the MUT equipment was purchased from Southwest Research Institute (SwRI) in April 1985, we have performed 15 inservice inspections and 5 preservice inspections. However, the reliability of examination was recently decreased rapidly as the problems which results from the old age of equipment and the frequent movement to plant site to site have occurred frequently. Therefore, the 3-axis control system hardware in occurring many problems among the equipments of mechanized ultrasonic testing (MUT) was designed and developed to cover the examination areas of nozzle-shell weld as specified in ASME Code Section XI and to improve the examination reliability. The new 3-axis control system hardware with the performance of this project was developed to be compatible with the old one and it was used as dual system or spare parts of the old system. Furthermore, the established technologies are expected to be applied to the similar control systems in nuclear power plant. 17 figs, 2 pix, 2 tabs, 10 refs. (Author)

  3. Maintainability design criteria for packaging of spacecraft replaceable electronic equipment.

    Science.gov (United States)

    Kappler, J. R.; Folsom, A. B.

    1972-01-01

    Maintainability must be designed into long-duration spacecraft and equipment to provide the required high probability of mission success with the least cost and weight. The ability to perform repairs quickly and easily in a space environment can be achieved by imposing specific maintainability design criteria on spacecraft equipment design and installation. A study was funded to investigate and define design criteria for electronic equipment that would permit rapid removal and replacement in a space environment. The results of the study are discussed together with subsequent simulated zero-g demonstration tests of a mockup with new concepts for packaging.

  4. Failure mode and effect analysis experimental reliability determination for the CANDU reactor equipment

    International Nuclear Information System (INIS)

    Vieru, G.

    1996-01-01

    This paper describes the experimental tests performed in order to prove the reliability parameters for certain equipment manufactured in INR Pitesti, for NPP Cernavoda. The tests were provided by Technical Specifications and test procedures. A comparison, referring to the reliability parameters, between Canadian equipment and INR manufactured equipment ones is also given. The results of tests and conclusions are shown. (author)

  5. Modeling the Process of Event Sequence Data Generated for Working Condition Diagnosis

    Directory of Open Access Journals (Sweden)

    Jianwei Ding

    2015-01-01

    Full Text Available Condition monitoring systems are widely used to monitor the working condition of equipment, generating a vast amount and variety of telemetry data in the process. The main task of surveillance focuses on analyzing these routinely collected telemetry data to help analyze the working condition in the equipment. However, with the rapid increase in the volume of telemetry data, it is a nontrivial task to analyze all the telemetry data to understand the working condition of the equipment without any a priori knowledge. In this paper, we proposed a probabilistic generative model called working condition model (WCM, which is capable of simulating the process of event sequence data generated and depicting the working condition of equipment at runtime. With the help of WCM, we are able to analyze how the event sequence data behave in different working modes and meanwhile to detect the working mode of an event sequence (working condition diagnosis. Furthermore, we have applied WCM to illustrative applications like automated detection of an anomalous event sequence for the runtime of equipment. Our experimental results on the real data sets demonstrate the effectiveness of the model.

  6. Experimental Equipment for Physics Studies in the Aagesta Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Bernander, G; Blomberg, P E; Dubois, P O

    1967-03-15

    Comprehensive physics measurements were carried out in connection with the start up of the Agesta reactor. For this purpose special experimental equipment was constructed and installed in the reactor. Parts of this were indispensable and/or time-saving for the reactivity control during the core build-up period and during the first criticality studies. This report gives mainly a detailed description of the experimental equipment used, but also the relevant physics background and the experience gained during the performance.

  7. LESSONS LEARNED IN TESTING OF SAFEGUARDS EQUIPMENT

    International Nuclear Information System (INIS)

    Pepper, S.; Farnitano, M.; Carelli, J.; Hazeltine, J.; Bailey, D.

    2001-01-01

    The International Atomic Energy Agency's (IAEA) Department of Safeguards uses complex instrumentation for the application of safeguards at nuclear facilities around the world. Often, this equipment is developed through cooperation with member state support programs because the Agency's requirements are unique and are not met by commercially available equipment. Before approving an instrument or system for routine inspection use, the IAEA subjects it to a series of tests designed to evaluate its reliability. In 2000, the IAEA began to observe operational failures in digital surveillance systems. In response to the observed failures, the IAEA worked with the equipment designer and manufacturer to determine the cause of failure. An action plan was developed to correct the performance issues and further test the systems to make sure that additional operational issues would not surface later. This paper addresses the steps taken to address operation issues related to digital image surveillance systems and the lessons learned during this process

  8. An optimization tool for satellite equipment layout

    Science.gov (United States)

    Qin, Zheng; Liang, Yan-gang; Zhou, Jian-ping

    2018-01-01

    Selection of the satellite equipment layout with performance constraints is a complex task which can be viewed as a constrained multi-objective optimization and a multiple criteria decision making problem. The layout design of a satellite cabin involves the process of locating the required equipment in a limited space, thereby satisfying various behavioral constraints of the interior and exterior environments. The layout optimization of satellite cabin in this paper includes the C.G. offset, the moments of inertia and the space debris impact risk of the system, of which the impact risk index is developed to quantify the risk to a satellite cabin of coming into contact with space debris. In this paper an optimization tool for the integration of CAD software as well as the optimization algorithms is presented, which is developed to automatically find solutions for a three-dimensional layout of equipment in satellite. The effectiveness of the tool is also demonstrated by applying to the layout optimization of a satellite platform.

  9. Fault diagnosis

    Science.gov (United States)

    Abbott, Kathy

    1990-01-01

    The objective of the research in this area of fault management is to develop and implement a decision aiding concept for diagnosing faults, especially faults which are difficult for pilots to identify, and to develop methods for presenting the diagnosis information to the flight crew in a timely and comprehensible manner. The requirements for the diagnosis concept were identified by interviewing pilots, analyzing actual incident and accident cases, and examining psychology literature on how humans perform diagnosis. The diagnosis decision aiding concept developed based on those requirements takes abnormal sensor readings as input, as identified by a fault monitor. Based on these abnormal sensor readings, the diagnosis concept identifies the cause or source of the fault and all components affected by the fault. This concept was implemented for diagnosis of aircraft propulsion and hydraulic subsystems in a computer program called Draphys (Diagnostic Reasoning About Physical Systems). Draphys is unique in two important ways. First, it uses models of both functional and physical relationships in the subsystems. Using both models enables the diagnostic reasoning to identify the fault propagation as the faulted system continues to operate, and to diagnose physical damage. Draphys also reasons about behavior of the faulted system over time, to eliminate possibilities as more information becomes available, and to update the system status as more components are affected by the fault. The crew interface research is examining display issues associated with presenting diagnosis information to the flight crew. One study examined issues for presenting system status information. One lesson learned from that study was that pilots found fault situations to be more complex if they involved multiple subsystems. Another was pilots could identify the faulted systems more quickly if the system status was presented in pictorial or text format. Another study is currently under way to

  10. Obtention and application of recovery coefficients in SUV values to quality control in PET equipment

    International Nuclear Information System (INIS)

    Oliveira, Cássio Miri; Sá, Lídia V. de; Santana, Priscila do Carmo; Mamede, Marcelo; Silva, Teógenes A. da

    2017-01-01

    The functional imaging technique Positron Emission Tomography (PET) using the radiopharmaceutical fluorodeoxyglucose ("1"8F-FDG) has been demonstrated an important role in the diagnosis and staging of cancer tumors. However, the standard uptake values (SUV) quantification of a 'lesion' or a hot spot is influenced by partial volume effects (PVE). This is particularly important for evaluating solid tumour response to therapy, where SUV quantification could indicate treatment efficiency. The objective of this study was to evaluate the efficiency of "1"8F-FDG uptake correction in two image quantification modes (SUVmaximum and SUVmedium) through recovery coefficients (RC) application. The NEMA/IEC Body Phantom simulator was used and tested for an activity ratio lesion to background of 4:1, and at different acquisition times. The images quantification was performed with OsiriX® software. The obtained RCs were applied to the phantom images. The obtained SUVmedium values corrected by RCs presented satisfactory results, demonstrating small differences (1.1% a 2.3%) in relation to previously known SUVreference values. This did not occur for corrected SUVmaximum values where differences of up to 27.0% were observed between these and SUVreference values. These results demonstrate that the PVE correction by SUVmedium can more adequate to evaluate tumor's uptake. Therefore, this parameter should be used for equipment quality control in order to evaluate the response and degree of agreement between equipment. (author)

  11. Standard guide for hot cell specialized support equipment and tools

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 Intent: 1.1.1 This guide presents practices and guidelines for the design and implementation of equipment and tools to assist assembly, disassembly, alignment, fastening, maintenance, or general handling of equipment in a hot cell. Operating in a remote hot cell environment significantly increases the difficulty and time required to perform a task compared to completing a similar task directly by hand. Successful specialized support equipment and tools minimize the required effort, reduce risks, and increase operating efficiencies. 1.2 Applicability: 1.2.1 This guide may apply to the design of specialized support equipment and tools anywhere it is remotely operated, maintained, and viewed through shielding windows or by other remote viewing systems. 1.2.2 Consideration should be given to the need for specialized support equipment and tools early in the design process. 1.2.3 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conv...

  12. Practices of prolongation of the I and C equipment lifetime

    International Nuclear Information System (INIS)

    Samoylov, O.B.; Pronin, V.S.; Savelov, I.D.; Bogomazov, V.A.; Drumov, V.V.; Chudin, A.G.

    2000-01-01

    The lifetime of nuclear power plants (NPP) always exceeds the operational time of Instrumentation and Control (I and C) systems. Ageing of I and C equipment in NPPs have many aspects. Research of these aspects is being performed in OKB Mechanical Engineering. Under condition of fast development of I and C systems and applying more stringent safety requirements, modernization of the equipment irrespective of its operational condition is getting important. However, an equipment of I and C systems operated in Russia was designed and manufactured applying highest requirements for a reliability of their work during its whole operational time. Therefore, in many cases it is not necessary to replace them in spite of expiration of their specified lifetime. During operation this equipment is maintained in a proper operation condition by a special service procedures stipulated by its development. When the equipment lifetime approaches to its end, lifetime extension for the certain period should be considered. (author)

  13. Development of an equipment management model to improve effectiveness of processes

    International Nuclear Information System (INIS)

    Chang, H. S.; Ju, T. Y.; Song, T. Y.

    2012-01-01

    The nuclear industries have developed and are trying to create a performance model to improve effectiveness of the processes implemented at nuclear plants in order to enhance performance. Most high performing nuclear stations seek to continually improve the quality of their operations by identifying and closing important performance gaps. Thus, many utilities have implemented performance models adjusted to their plant's configuration and have instituted policies for such models. KHNP is developing a standard performance model to integrate the engineering processes and to improve the inter-relation among processes. The model, called the Standard Equipment Management Model (SEMM), is under development first by focusing on engineering processes and performance improvement processes related to plant equipment used at the site. This model includes performance indicators for each process that can allow evaluating and comparing the process performance among 21 operating units. The model will later be expanded to incorporate cost and management processes. (authors)

  14. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  15. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  16. Novel Field Test Equipment for Lithium-Ion Batteries in Hybrid Electrical Vehicle Applications

    Directory of Open Access Journals (Sweden)

    Goran Lindbergh

    2011-04-01

    Full Text Available Lifetime testing of batteries for hybrid-electrical vehicles (HEV is usually performed in the lab, either at the cell, module or battery pack level. Complementary field tests of battery packs in vehicles are also often performed. There are, however, difficulties related to field testing of battery-packs. Some examples are cost issues and the complexity of continuously collecting battery performance data, such as capacity fade and impedance increase. In this paper, a novel field test equipment designed primarily for lithium-ion battery cell testing is presented. This equipment is intended to be used on conventional vehicles, not hybrid vehicles, as a cheaper and faster field testing method for batteries, compared to full scale HEV testing. The equipment emulates an HEV environment for the tested battery cell by using real time vehicle sensor information and the existing starter battery as load and source. In addition to the emulated battery cycling, periodical capacity and pulse testing capability are implemented as well. This paper begins with presenting some background information about hybrid electrical vehicles and describing the limitations with today’s HEV battery testing. Furthermore, the functionality of the test equipment is described in detail and, finally, results from verification of the equipment are presented and discussed.

  17. The Tanzania experience: clinical laboratory testing harmonization and equipment standardization at different levels of a tiered health laboratory system.

    Science.gov (United States)

    Massambu, Charles; Mwangi, Christina

    2009-06-01

    The rapid scale-up of the care and treatment programs in Tanzania during the preceding 4 years has greatly increased the demand for quality laboratory services for diagnosis of HIV and monitoring patients during antiretroviral therapy. Laboratory services were not in a position to cope with this demand owing to poor infrastructure, lack of human resources, erratic and/or lack of reagent supply and commodities, and slow manual technologies. With the limited human resources in the laboratory and the need for scaling up the care and treatment program, it became necessary to install automated equipment and train personnel for the increased volume of testing and new tests across all laboratory levels. With the numerous partners procuring equipment, the possibility of a multitude of equipment platforms with attendant challenges for procurement of reagents, maintenance of equipment, and quality assurance arose. Tanzania, therefore, had to harmonize laboratory tests and standardize laboratory equipment at different levels of the laboratory network. The process of harmonization of tests and standardization of equipment included assessment of laboratories, review of guidelines, development of a national laboratory operational plan, and stakeholder advocacy. This document outlines this process.

  18. Authorisation for work with electrical equipment

    CERN Multimedia

    Balle, Christoph

    2013-01-01

    The evaluation of training needs must be conducted by the Group Leader for every employee who could potentially be exposed to an electrical hazard. An analysis must be performed taking into account: • the voltage range (TBT, BT, HTA, HTB) • the type of work to be done (for example, work on a low-voltage line) • the type and the characteristics of the structures, installations and equipment • the type of current (alternating or direct) • the person’s ability to perform the operation

  19. Evaluation of the composition of filters additional of equipment radiological intraoral by energy dispersive x-ray fluorescence (EDXRF)

    International Nuclear Information System (INIS)

    Franca, Alana Caroline; Torres, Catarina A.M.P.; Rocha, Ana S.S.; Deniak, Valeriy; Lara, Alessandro L.; Paschuk, Sergei A.; Fernandes, Angela; Westphalen, Fernando Henrique

    2013-01-01

    The need for high quality standards for radiographic images in order to make a diagnosis assertive, and being the additional filtration required in the intraoral X-ray equipment show the need of evaluating these filters. This study aims to examine the influence of the elemental composition of the filters of X-ray of dental intraoral equipment in the radiographic images quality. The filters analysis were performed by using the energy dispersive X-ray fluorescence method (EDXRF). Ten conventional filters were analysed. In this study, 33 radiographic exposures were performed using films: twenty radiographs in the incisor region and ten in the molar region, three exposures were also made in the same regions with same conditions without using filter. After radiographs development, optical density was measure and all radiographs were submitted to subjective evaluation by dental radiologists. Data obtained were correlated to effects evaluation of the elemental composition of all filters in the quality of the radiographic images. The elements found were: aluminum, cobalt, copper, sulfur, iron, manganese, titanium, zinc, and zirconium. The images obtained were identified in groups: Molars to 0.3 s; Incisors to 0.2 s; Incisors to 0.3 s, and for the group without filters. From the results obtained it was concluded that both unclear radiographs and ideal radiographs were produced by using filters of elementary common. Therefore, conventional filters evaluated were an acceptable option to produce quality images in dental radiology, despite differences in the composition of the alloys. (author)

  20. Evaluation of the composition of filters additional of equipment radiological intraoral by energy dispersive x-ray fluorescence (EDXRF)

    Energy Technology Data Exchange (ETDEWEB)

    Franca, Alana Caroline; Torres, Catarina A.M.P.; Rocha, Ana S.S.; Deniak, Valeriy; Lara, Alessandro L.; Paschuk, Sergei A., E-mail: alanacarolinef@gmail.com, E-mail: sergei@utfpr.edu.br [Universidade Tecnologica Federal do Parana (CPGEI/UTFPR), Curitiba, PR (Brazil). Programa de Pos-Graduacao em Engenharia Eletrica e Informatica Industrial; Fernandes, Angela; Westphalen, Fernando Henrique, E-mail: angelafernandes@ufpr.br [Universidade Federal do Parana (UFPR), Curitiba, PR (Brazil). Setor de Ciencias da Saude

    2013-07-01

    The need for high quality standards for radiographic images in order to make a diagnosis assertive, and being the additional filtration required in the intraoral X-ray equipment show the need of evaluating these filters. This study aims to examine the influence of the elemental composition of the filters of X-ray of dental intraoral equipment in the radiographic images quality. The filters analysis were performed by using the energy dispersive X-ray fluorescence method (EDXRF). Ten conventional filters were analysed. In this study, 33 radiographic exposures were performed using films: twenty radiographs in the incisor region and ten in the molar region, three exposures were also made in the same regions with same conditions without using filter. After radiographs development, optical density was measure and all radiographs were submitted to subjective evaluation by dental radiologists. Data obtained were correlated to effects evaluation of the elemental composition of all filters in the quality of the radiographic images. The elements found were: aluminum, cobalt, copper, sulfur, iron, manganese, titanium, zinc, and zirconium. The images obtained were identified in groups: Molars to 0.3 s; Incisors to 0.2 s; Incisors to 0.3 s, and for the group without filters. From the results obtained it was concluded that both unclear radiographs and ideal radiographs were produced by using filters of elementary common. Therefore, conventional filters evaluated were an acceptable option to produce quality images in dental radiology, despite differences in the composition of the alloys. (author)

  1. Virtual microscopy: an evaluation of its validity and diagnostic performance in routine histologic diagnosis of skin tumors

    DEFF Research Database (Denmark)

    Nielsen, Patricia Switten; Lindebjerg, Jan; Rasmussen, Jan

    2010-01-01

    Digitization of histologic slides is associated with many advantages, and its use in routine diagnosis holds great promise. Nevertheless, few articles evaluate virtual microscopy in routine settings. This study is an evaluation of the validity and diagnostic performance of virtual microscopy...... in routine histologic diagnosis of skin tumors. Our aim is to investigate whether conventional microscopy of skin tumors can be replaced by virtual microscopy. Ninety-six skin tumors and skin-tumor-like changes were consecutively gathered over a 1-week period. Specimens were routinely processed, and digital...... slides were captured on Mirax Scan (Carl Zeiss MicroImaging, Göttingen, Germany). Four pathologists evaluated the 96 virtual slides and the associated 96 conventional slides twice with intermediate time intervals of at least 3 weeks. Virtual slides that caused difficulties were reevaluated to identify...

  2. Elementwise Business Diagnosis of Enterprise Activity

    Directory of Open Access Journals (Sweden)

    Skrynkovskyy Ruslan M.

    2016-02-01

    Full Text Available The article presents methodological and indicator apparatus for elementwise business diagnosis of enterprise activity directed at achieving such elementwise diagnostic objectives: diagnosis of return on assets; diagnosis of return on equity capital; diagnosis of production profitability; diagnosis of gross profit margin of product sales; diagnosis of operating margin of product sales; diagnosis of net margin of product sales; diagnosis of absolute liquidity; diagnosis of instant liquidity; diagnosis of overall liquidity; diagnosis of coverage; diagnosis of financial independence; diagnosis of equity capital maneuverability; diagnosis of financial leverage; diagnosis of the long-term investment structure; diagnosis of accounts payable turnover; diagnosis of the accounts payable repayment period, diagnosis of receivables turnover; diagnosis of receivables repayment period; diagnosis of assets turnover; diagnosis of inventories turnover; diagnosis of the inventories turnover period; diagnosis of equity capital turnover; diagnosis of fixed assets turnover (return on assets; diagnosis of capital coefficient; diagnosis of the ratio of output value to the materials cost; diagnosis of material consumption; diagnosis of the total production cost; diagnosis of enterprise market share; diagnosis of fixed assets wear; diagnosis of fixed assets renewal; diagnosis of fixed assets retirement; performance diagnosis; diagnosis of labor intensity, diagnosis of the capital-labour ratio; diagnosis of efficiency; diagnosis of conducting the business; diagnosis of business relations; diagnosis of administrative-legal relations; diagnosis of knowledge management. The elementwise diagnostic objectives of the enterprise system of diagnostic objectives are aimed at a narrow highly detailed diagnostics of individual indicators of the enterprise activity, i.e. the evaluation of specific analytical indicators,monitoring (research of their dynamics, comparison of the planned

  3. EnergiTools(R) - a power plant performance monitoring and diagnosis tool

    International Nuclear Information System (INIS)

    Ancion, P.V.; Bastien, R.; Ringdahl, K.

    2000-01-01

    Westinghouse EnergiTools(R) is a performance diagnostic tool for power generation plants that combines the power of on-line process data acquisition with advanced diagnostics methodologies. The system uses analytical models based on thermodynamic principles combined with knowledge of component diagnostic experts. An issue in modeling expert knowledge is to have a framework that can represent and process uncertainty in complex systems. In such experiments, it is nearly impossible to build deterministic models for the effects of faults on symptoms. A methodology based on causal probabilistic graphs, more specifically on Bayesian belief networks, has been implemented in EnergiTools(R) to capture the fault-symptom relationships. The methodology estimates the likelihood of the various component failures using the fault-symptom relationships. The system also has the ability to use neural networks for processes that are difficult to model analytically. An application is the estimation of the reactor power in nuclear power plant by interpreting several plant indicators. EnergiTools(R) is used for the on-line performance monitoring and diagnostics at Vattenfall Ringhals nuclear power plants in Sweden. It has led to the diagnosis of various performance issues with plant components. Two case studies are presented. In the first case, an overestimate of the thermal power due to a faulty instrument was found, which led to a plant operation below its optimal power. The paper shows how the problem was discovered, using the analytical thermodynamic calculations. The second case shows an application of EnergiTools(R) for the diagnostic of a condenser failure using causal probabilistic graphs

  4. Catalog of physical protection equipment. Book 1: Volume I. Barriers and structural components

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    A catalog of commercially available physical protection equipment has been prepared for use by the U.S. Nuclear Regulatory Commission (NRC). Included is information on barrier structures and equipment, interior and exterior intrusion detection sensors, entry (access) control devices, surveillance and alarm assessment equipment, contraband detection sensors, automated response equipment, general purpose displays and general purpose communications, with one volume devoted to each of these eight areas. For each item of equipment the information included consists of performance, physical, cost and supply/logistics data. The entire catalog is contained in three notebooks for ease in its use by licensing and inspection staff at NRC

  5. Catalog of physical protection equipment. Book 3: Volume VII. General purpose display components

    International Nuclear Information System (INIS)

    1977-06-01

    A catalog of commercially available physical protection equipment has been prepared under MITRE contract AT(49-24)-0376 for use by the U. S. Nuclear Regulatory Commission (NRC). Included is information on barrier structures and equipment, interior and exterior intrusion detection sensors, entry (access) control devices, surveillance and alarm assessment equipment, contraband detection sensors, automated response equipment, general purpose displays and general purpose communications, with one volume devoted to each of these eight areas. For each item of equipment the information included consists of performance, physical, cost and supply/logistics data. The entire catalog is contained in three notebooks for ease in its use by licensing and inspection staff at NRC

  6. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  7. Equipment nonconformance and degradation: Promptly determining operability and establishing corrective action plans

    International Nuclear Information System (INIS)

    Hoxie, C.L.; Cotton, K.R.; Emch, R.L. Jr.

    1992-01-01

    Nine principles for dealing with degraded and nonconforming equipment are presented and some examples are discussed. The distinction between equipment operability (i.e., capability to perform the safety function) and equipment qualification (conformance to all aspects of the current licensing basis, including codes and standards, design criteria, and commitments) is discussed. The concept of finding reasonable assurance of safety for continued plant operation for equipment not covered by technical specifications is also presented. Degraded or nonconforming equipment must be evaluated for its safety impact and for operability. In all cases, degraded or nonconforming conditions must ultimately be resolved, either through prompt corrective action or through some process of showing that the changed state of the plant is acceptable for continued operation, based on 10 CFR 50.59

  8. Guide for the evaluation of physical protection equipment. Book 2: Volumes IV--VIII

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    A guide for evaluating the performance of commercially available physical protection equipment has been prepared for use by U.S. NRC. Separate evaluation procedures are provided for each generic type of equipment contained in the companion document, Catalog of Physical Protection Equipment (NUREG-0274). Among the equipment parameters evaluated are sensitivity, area/volume of coverage, false/nuisance alarm rate, resistance to countermeasures, environmental requirements, installation parameters and maintenance. Four evaluation techniques are employed (inspections, analyses, demonstrations and tests); standard test equipment (both commercially available as well as developmental) to be used in the evaluation is listed. The following categories of equipment are covered: surveillance and alarm assessment components, contraband detection components, automated response components, general purpose display components, and general purpose communication components

  9. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  10. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  11. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  12. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  13. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  14. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  15. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  16. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  17. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  18. Radiation protection problems with dental radiological equipment

    International Nuclear Information System (INIS)

    Cooney, P.; Rajan, J.; Malone, J.F.; Gavin, G.

    1995-01-01

    With the advent of the EC Patient Directive, the importance of surveying and optimising patient exposure for diagnostic imaging procedures is paramount. In the field of dentistry there has been a heightened interest in areas of equipment performance and patient exposure. This interest, coupled with a number of dental radiation safety incidents investigated by our department, and the issuing of a Code of Practice for Radiological Protection in Dentistry by the Department of Health, led to the establishment in our department, of an evaluation protocol for the performance and operation of dental X ray equipment. The protocol was used to perform a survey on over 100 dental X ray units in use in the Public Sector in Ireland. This presentation will report on the radiation incidents mentioned above. It will detail the protocol and furnish the results and conclusions of the survey. The survey has made it possible to establish clearly the necessary steps required to ensure compliance with requirements. In addition, the corrective steps taken by the dental authorities will be presented and the overall impact of the regulations and the programme consequent on them will be reviewed. (Author)

  19. A procedure for routine radiation protection checking of mammography equipment

    International Nuclear Information System (INIS)

    Bengtsson, L.G.; Lundehn, I.

    1980-01-01

    A procedure was developed for checking of mammography equipment used in screening for mammary cancer. The procedure will be handled by hospital physicists or x-ray inspectors and is intended to permit checking of x-ray equipment performance as well as evaluation of mean dose or eneray imparted to groups of patients. Measurement methods studied involve TLD, ionization chambers and a new plastic scintillator designed to measure energy imparted. After careful study of sizes and attenuation properties of breasts, a 50 mm polymethylmetacrylate phantom seemed the most appropriate. The choice of measuring equipment is reported as well as some preliminary results from field measurements. (author)

  20. [Emphasis on standardization and refinement in the diagnosis and treatment of dry eye].

    Science.gov (United States)

    Liu, Z G

    2017-09-11

    Dry eye is the second most common ocular disease. In China, the incidence rate of dry eye has reached 21% to 30%, and dry eye patients have accounted for more than 30% of the total ophthalmology outpatients. Dry eye has become a common health problem that affects the working efficiency and life quality of Chinese people. Over the past decade, due to the rapid development of diagnostic equipments and new treatments for dry eye, dry eye has become one of the areas with greatest concerns in ophthalmology, and many eye institutions have set up their dry eye clinics. Although the diagnosis and treatment of dry eye has been improved in recent years, the awareness of dry eye in Chinese ophthalmologists is still too simple. In the diagnosis, the interrogation and basic examination are not given enough attention, and we are over-relying on equipments. Clinical examination and instrument operation also have not been standardized. This article emphasizes that we should pay attention to the interrogation, basic examination and standardization of clinical examination and equipment operation in diagnosing dry eye. The treatment regimen should be mostly refined and optimized to be individualized and comprehensive based on the causes, types and severity of dry eye. In addition, the physical and adjuvant therapy of dry eye should be given sufficient attention and applied reasonably. (Chin J Ophthalmol, 2017, 53: 641-644) .

  1. Acquired image quality in digital industrial radiographic equipments

    International Nuclear Information System (INIS)

    Oliveira, Cristiane de Queiroz; Lopes, Ricardo Tadeu; Oliveira, Davi F.

    2008-01-01

    The computerized radiographic application in the industrial area is a recent event. The imaging plate is the equipment used as imaging receiver during the exposition radiographic technique, which consists of a flexible photostimulable phosphor screen, capable of storing the photons energy of the incident X and γ rays and of a reading unit which uses a laser device to stimulate a visible light. As two types of phosphor screen are manufactured, one for general use (General Plate - GP) and another one for specific using (High Resolution-HR), one of the objectives of this study was to evaluate the spatial resolution capability in both plates using the Kodak equipment. Furthermore, equipment from different makers, Kodak and General Electric Company - GE, were compared. Two phosphor screen HR were used as the main objective of this study. Imaging Quality Indicators - IQI were used to evaluate the spatial resolution of the images in accordance with ASME and DIN standard. The results show that after evaluating the GP and HR Kodak plates, the HR plate was capable of showing a larger resolution of details. However, after evaluating the performance of the HR Kodak plate and GE plate, over the same acquisition condition and with the same size of the laser focal set of 87 μm, the results show a superiority in the GE equipment used for industrial radiographic, mainly for processed images in each specific ambient of digital processing and its performance in meeting satisfactorily the ASME code and the DIN standard. (author)

  2. Magnetic resonance in prenatal diagnosis of thoracic anomalies

    International Nuclear Information System (INIS)

    Pietrani, M.; Elias, D.; Wojakowski, A.; Fataljaef, V.; Carcano, M.; Otano, L.

    2007-01-01

    The objective of this article is to communicate the experience in the evaluation of fetal anomalies thoracic by means of magnetic resonance. Between January, 2001 - March, 2007 16 fetus were evaluated by means of magnetic resonance with echographic diagnosis of thoracic anomalies. An equipment of 1.5 TESLA was used. The thoracic anatomy was valued in general. At the presence of discovering pulmonary mass, their size, volume and intensity of sign were determined. The echographic and magnetic resonance findings were checked against the perinatal results [es

  3. Research of Control System and Fault Diagnosis of the Sound-absorbing Board Production Line

    Directory of Open Access Journals (Sweden)

    Yanjun Xiao

    2014-08-01

    Full Text Available Programmable Logic Controller is the core of the control system of the sound- absorbing board production line and the design of fault diagnosis is an essential modules in the sound- absorbing board production line. The article discourses the application of PLC in the control system of the production line, and designs the methods of grading treatment and prevention of troubles, which makes use of PLC’S logic functions. The method has good expansibility, and has good guidance to the fault diagnosis in other automation equipments.

  4. The LHC's equipment all in step

    CERN Multimedia

    2005-01-01

    Over 80% of the control equipment for the LHC will be connected by a special communication network known as WorldFIP, which has been chosen for its very precise timing, excellent operating performance and robustness in difficult environments. Over 350 kilometres of this network are currently being installed in the LHC tunnel and checked for compliance with the required standards.

  5. Mobil laboratory for the evaluation on site of the power electric equipment, second generation; Laboratorio movil para la evaluacion en sitio del equipo electrico de potencia, segunda generacion

    Energy Technology Data Exchange (ETDEWEB)

    Carrillo C, Jaime; Escorsa M, Oscar; Estrada G, Javier A; Iturbe F, Marlene; Robles P, Edgar [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2005-07-01

    To the interior of the Generation of Electrical Equipment (GEE) of the Instituto de Investigaciones Electricas, one of the main activities is the diagnosis of the electrical equipment in service. It is well known that the power equipment represents a strong investment that requires the guarantee that it has been manufactured, installed and operated satisfactorily. The life expectancy of these devices is of thirty years, however, many of them already have surpassed that expectation. The rehabilitation or substitution of the equipment implies new investments that are needed for an evaluation of the real condition of the equipment to carry out such rehabilitation. One of the tools necessary to carry out the diagnosis, is a movable laboratory that facilitates all the necessary tools to perform a meticulous analysis that would allow, the client, to make high cost decisions. The application of the movable laboratory is advisable from the inauguration of the equipment. The electrical mechanisms are factory tested in accordance with standardized protocols; it guarantees the fulfillment of the necessary requirements for a correct operation. Nevertheless, when taking them to the assembly site, these are subjected to a series of processes and mechanical stresses that could alter the equipment conditions and its integrity. [Spanish] Al interior de la Generacion de Equipos Electricos (GEE) del Instituto de Investigaciones Electricas, una de las principales actividades es el diagnostico del equipo electrico en servicio. Es bien sabido que los equipos de potencia representan una fuerte inversion que requiere la garantia de que se ha fabricado, instalado y operado satisfactoriamente. La esperanza de vida de estos dispositivos es de treinta anos, no obstante, muchos de ellos ya han superado esa expectativa. La rehabilitacion o sustitucion de equipos, implica nuevas inversiones que precisan un conocimiento del estado real del equipo para llevarla a cabo. Una de las herramientas

  6. Experimental mesenteric ischemia. Radioisotopic diagnosis

    International Nuclear Information System (INIS)

    Alberti, Carlos; Dallaglio, Juan; Sarra, Luis; Obiols, Eugenio; Rodriguez Santos, Emilio; Delgado, Eduardo; Castelleti, Luis

    1995-01-01

    A non-invasive radionuclide technique with 99-Tc-DMP for the early diagnosis of small bowel infarction due to mesenteric artery compression, was evaluated. The usefulness of 99-Tc-DMP and critical pressure of mesenteric artery were demonstrated. The diagnosis was performed before one hour had passed from the beginning of the ischemia

  7. [Importance of quality control of baciloscopy in laboratories that perform diagnosis of tuberculosis].

    Science.gov (United States)

    Sardiñas, Misleidis; García, Grechen; Rosarys Martínez, María; Díaz, Raúl; Mederos, Lilian M

    2016-06-01

    Baciloscopy is the primary tool for pulmonary tuberculosis diagnosis, being this technique the most used internationally in the search for infectious cases. Quality control is the process of the rechecking smears by a highly qualified observer. To evaluate and highlight the importance of quality control of smear microscopy in the Provincial Laboratories diagnosticians of Tuberculosis in Cuba. This study was conducted at the National Reference Laboratory and Research in Tuberculosis, Leprosy and Mycobacteria in the Institute of Tropical Medicine "Pedro Kouri", Havana, Cuba, Were evaluated 2676 smears received from January 2013 to December 2014, from Provincial Centers of Hygiene, Epidemiology and Microbiology of Cuba, including the special municipality Isla de la Juventud. 2,664 (99.5%) were concordant smears, the correlation obtained for the positive smears were 96.5% and 99.8% for negative. Were identified12 reading errors: 7 (3.5%) false positive and 5 (0.2%) false negatives. Slides were classified with adequate quality of smears in 2039 (76.2%), showed difficulties in realizing the extension in 1464 (54.7%) and staining were adequate in 2343 (87.6%). The kappa index was 0.9674. Although there was good agreement between observations it is recommended to improve the quality of extended, maintain staff training program that performs this activity, like regular supervision by specialists, to further improve the quality of diagnosis.

  8. Radiographic features of Mycoplasma pneumoniae pneumonia: differential diagnosis and performance timing

    International Nuclear Information System (INIS)

    Miyashita, Naoyuki; Sugiu, Tadaaki; Kawai, Yasuhiro; Oda, Keiko; Yamaguchi, Tetsuya; Ouchi, Kazunobu; Kobashi, Yoshihiro; Oka, Mikio

    2009-01-01

    The Japanese Respiratory Society guidelines propose a differential diagnosis for atypical pneumonia and bacterial pneumonia using a scoring system for the selection of appropriate antibiotic. In order to improve this scoring system, the guidelines are seeking new specific parameter. The purpose of this study was to clarify the pattern of abnormalities with Mycoplasma pneumoniae pneumonia on chest computed tomography (CT) and whether the radiographic findings could distinguish M. pneumoniae pneumonia from Streptococcus pneumoniae pneumonia. A retrospective review was performed of the CT findings of 64 cases and 68 cases where M. pneumoniae and S. pneumoniae, respectively, were the only pathogen identified by the panel of diagnostic tests used. Of the 64 patients with M. pneumoniae pneumonia, bronchial wall thickening was observed most frequently (81%), followed by centrilobular nodules (78%), ground-glass attenuation (78%), and consolidation (61%). Bronchial wall thickening and centrilobular nodules were observed more often in M. pneumoniae patients than in S. pneumoniae patients (p < 0.0001). The presence of bilateral bronchial wall thickening or centrilobular nodules was only seen in patients with M. pneumoniae pneumonia. Using the scoring system of the Japanese Respiratory Society guidelines and chest CT findings, 97% of M. pneumoniae patients were suspected to be M. pneumoniae pneumonia without serology. When comparing the CT findings between early stage and progressed stage in the same patients with severe pneumonia, the radiographic features of early stage M. pneumoniae pneumonia were not observed clearly in the progressed stage. The present results indicate that the diagnosis of M. pneumoniae pneumonia would appear to be reliable when found with a combination of bronchial wall thickening and centrilobular nodules in the CT findings. However, these CT findings are not observed in progressed severe M. pneumoniae pneumonia patients

  9. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  10. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  11. Development of a standard equipment management model for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Hee Seung; Ju, Tae Young; Kim, Jung Wun [KHNP Central Research Institute, Daejeon (Korea, Republic of)

    2012-10-15

    Most utilities that have achieved high performance have introduced a management model to improve performance and operate plants safely. The Nuclear Energy Institute has developed and updated its Standard Nuclear Performance Model (SNPM) in order to provide a summary of nuclear processes, cost definitions, and key business performance measures for business performance comparison and benchmarking. Over the past decade, Korea Hydro and Nuclear Power Co. (KHNP) has introduced and implemented many engineering processes such as Equipment Reliability (ER), Maintenance Rule (MR), Single Point Vulnerability (SPV), Corrective Action Program (CAP), and Self Assessment (SA) to improve plant performance and to sustain high performance. Some processes, however, are not well interfaced with other processes, because they were developed separately and were focused on the process itself. KHNP is developing a Standard Equipment Management Model (SEMM) to integrate these engineering processes and to improve the interrelation among the processes. In this paper, a draft model and attributes of the SEMM are discussed.

  12. Development of a standard equipment management model for nuclear power plants

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Ju, Tae Young; Kim, Jung Wun

    2012-01-01

    Most utilities that have achieved high performance have introduced a management model to improve performance and operate plants safely. The Nuclear Energy Institute has developed and updated its Standard Nuclear Performance Model (SNPM) in order to provide a summary of nuclear processes, cost definitions, and key business performance measures for business performance comparison and benchmarking. Over the past decade, Korea Hydro and Nuclear Power Co. (KHNP) has introduced and implemented many engineering processes such as Equipment Reliability (ER), Maintenance Rule (MR), Single Point Vulnerability (SPV), Corrective Action Program (CAP), and Self Assessment (SA) to improve plant performance and to sustain high performance. Some processes, however, are not well interfaced with other processes, because they were developed separately and were focused on the process itself. KHNP is developing a Standard Equipment Management Model (SEMM) to integrate these engineering processes and to improve the interrelation among the processes. In this paper, a draft model and attributes of the SEMM are discussed

  13. Microanalysis in cancer diagnosis

    Energy Technology Data Exchange (ETDEWEB)

    Tkacheva, G A [Akademiya Meditsinskikh Nauk SSSR, Moscow. Onkologicheskij Nauchnyj Tsentr

    1984-11-01

    An analysis of the diagnosis accuracy of malignant gastric, rectal, liver and prostatic tumors was performed with relation to the sensitivity and specificity of radioimmunological and immunoenzyme commercial kits of reagents manufactured by different companies and used to determine the concentration of the carcinoembryonic antigen, ..cap alpha..-fetoprotein and acid phosphatase of the prostate. With an increase of the test specificity its diagnostic sensitivity decreases, i.e. the percentage of false-negative results increases. The use of highly specific monoclonal antibodies in serological tests results in a marked decrease of the accuracy of tumor diagnosis. It is necessary to strictly determine indications for the use of the serological and immunodiagnostic kits: for the identification of risk populations, early diagnosis of tumors, differential diagnosis or the monitoring of patients.

  14. Laparoscopic diagnosis of endometriosis.

    Science.gov (United States)

    Wood, Carl; Kuhn, Raphael; Tsaltas, Jim

    2002-08-01

    To consider and explain the possibility of difficulties in diagnosis of endometriosis at previous laparoscopy Retrospective patient record review. The Endometriosis Care Centre of Australia and the private practices of authors. Two hundred and fifteen patients with clinical evidence of endometriosis examined laparoscopically between March 1999 and May 2001. Confirmation of endometriosis by histological biopsy. Endometriosis was confirmed in 168 of the 215 women. Of these women 38 had a previous negative laparoscopy within 12 months of the current laparoscopy. It is possible that in some of the patients, who previously had a negative laparoscopy, endometriosis was not recognised. Possible reasons for difficulty in diagnosis have been identified and techniques to improve diagnosis suggested. This retrospective study was performed to consider and explain the possibility of difficulties in diagnosis of endometriosis at previous laparoscopy.

  15. 40 CFR Appendix B1 to Subpart F of... - Performance of Refrigerant Recovery, Recycling and/or Reclaim Equipment

    Science.gov (United States)

    2010-07-01

    ... Refrigeration Institute Standard 740-1993. Refrigerant Recovery/Recycling Equipment Section 1. Purpose 1..., Recycling and/or Reclaim Equipment B1 Appendix B1 to Subpart F of Part 82 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Recycling...

  16. Equipment to weld fuel rods of mixed oxides

    International Nuclear Information System (INIS)

    Aparicio, G.; Orlando, O.S.; Olano, V.R.; Toubes, B.; Munoz, C.A.

    1987-01-01

    Two welding outfits system T1G were designed and constructed to weld fuel rods with mixed oxides pellets (uranium and plutonium). One of them is connected to a glove box where the loading of sheaths takes place. The sheaths are driven to the welder through a removable plug pusher in the welding chamber. This equipment was designed to perform welding tests changing the parameters (gas composition and pressure, welding current, electrode position, etc.). The components of the welder, such as plug holder, chamber closure and peripheral accessories, were designed and constructed taking into account the working pressures in the machine, which is placed in a controlled area and connected to a glove box, where special safety conditions are necessary. The equipment to weld fuel bars is complemented by another machine, located in cold area, of the type presently used in the fuel elements factory. This equipment has been designed to perform some welding operations in sheaths and mixed oxide rods of the type Atucha I and II. Both machines have a programmed power supply of wide range and a vacuum, and pressurizing system that allows the change of parameters. Both systems have special features of handling and operation. (Author)

  17. Development of Plant Control Diagnosis Technology and Increasing Its Applications

    Science.gov (United States)

    Kugemoto, Hidekazu; Yoshimura, Satoshi; Hashizume, Satoru; Kageyama, Takashi; Yamamoto, Toru

    A plant control diagnosis technology was developed to improve the performance of plant-wide control and maintain high productivity of plants. The control performance diagnosis system containing this technology picks out the poor performance loop, analyzes the cause, and outputs the result on the Web page. Meanwhile, the PID tuning tool is used to tune extracted loops from the control performance diagnosis system. It has an advantage of tuning safely without process changes. These systems are powerful tools to do Kaizen (continuous improvement efforts) step by step, coordinating with the operator. This paper describes a practical technique regarding the diagnosis system and its industrial applications.

  18. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  19. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  20. Color capable sub-pixel resolving optofluidic microscope and its application to blood cell imaging for malaria diagnosis.

    Directory of Open Access Journals (Sweden)

    Seung Ah Lee

    Full Text Available Miniaturization of imaging systems can significantly benefit clinical diagnosis in challenging environments, where access to physicians and good equipment can be limited. Sub-pixel resolving optofluidic microscope (SROFM offers high-resolution imaging in the form of an on-chip device, with the combination of microfluidics and inexpensive CMOS image sensors. In this work, we report on the implementation of color SROFM prototypes with a demonstrated optical resolution of 0.66 µm at their highest acuity. We applied the prototypes to perform color imaging of red blood cells (RBCs infected with Plasmodium falciparum, a particularly harmful type of malaria parasites and one of the major causes of death in the developing world.

  1. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  2. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  3. Penitentiary Diagnosis of Crime Offenders

    Directory of Open Access Journals (Sweden)

    Wiola Friedrich

    2015-06-01

    Full Text Available One of the basic standards of serving the punishment of imprisonment is its individualization, which means varying interactions consisting in adjusting them to the personality of the offender and the purposes of executing the sentence. A properly served psychological diagnosis, especially the penitentiary diagnosis, should describe the studied phenomenon well. The content of the penitentiary diagnosis should include a description of the clinical picture of an imprisoned person and basic social rehabilitation indications. The paper was written on the basis of literature on the subject, legislation and available research results. The aim of this paper is to characterize the diagnosis performed for the needs of justice, which is continuous and should be performed at every stage of imprisonment. The effect of a properly formed psychological and penitentiary decision should be the placement of a prisoner in a suitable type, kind of prison and appropriate system of serving imprisonment, followed by the correct selection of educational measures which may imply the efficiency and effectiveness of the punishment of imprisonment.

  4. Embedded vision equipment of industrial robot for inline detection of product errors by clustering–classification algorithms

    Directory of Open Access Journals (Sweden)

    Kamil Zidek

    2016-10-01

    Full Text Available The article deals with the design of embedded vision equipment of industrial robots for inline diagnosis of product error during manipulation process. The vision equipment can be attached to the end effector of robots or manipulators, and it provides an image snapshot of part surface before grasp, searches for error during manipulation, and separates products with error from the next operation of manufacturing. The new approach is a methodology based on machine teaching for the automated identification, localization, and diagnosis of systematic errors in products of high-volume production. To achieve this, we used two main data mining algorithms: clustering for accumulation of similar errors and classification methods for the prediction of any new error to proposed class. The presented methodology consists of three separate processing levels: image acquisition for fail parameterization, data clustering for categorizing errors to separate classes, and new pattern prediction with a proposed class model. We choose main representatives of clustering algorithms, for example, K-mean from quantization of vectors, fast library for approximate nearest neighbor from hierarchical clustering, and density-based spatial clustering of applications with noise from algorithm based on the density of the data. For machine learning, we selected six major algorithms of classification: support vector machines, normal Bayesian classifier, K-nearest neighbor, gradient boosted trees, random trees, and neural networks. The selected algorithms were compared for speed and reliability and tested on two platforms: desktop-based computer system and embedded system based on System on Chip (SoC with vision equipment.

  5. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  6. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  7. Guide for the evaluation of physical protection equipment. Book 1: Volumes I--III

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    A guide for evaluating the performance of commercially available physical protection equipment has been prepared in partial fulfillment of Task 2 of MITRE contract AT(49-24)-0376 for use by the U.S. Nuclear Regulatory Commission (NRC). Separate evaluation procedures are provided for each generic type of equipment contained in the companion document, Catalog of Physical Protection Equipment. Among the equipment parameters evaluated, as appropriate, are sensitivity, area/volume of coverage, false/nuisance alarm rate, resistance to countermeasures, environmental requirements, installation parameters and maintenance. Four evaluation techniques are employed (inspections, analyses, demonstrations and tests); standard test equipment (both commercially available as well as developmental) to be used in the evaluation are listed

  8. Performance of polymerase chain reaction for the diagnosis of cystic echinococcosis using serum, urine, and cyst fluid samples.

    Science.gov (United States)

    Chaya, Dr; Parija, Subhash Chandra

    2014-01-01

    Cystic echinococcosis (CE) is a chronic zoonosis which presents with variable clinical manifestations. Currently the diagnosis of this disease is based on radiological findings and serological tests which lack specificity. Although antigen detection from the cyst fluid is the most specific, it is seldom done due to the complications involved. Detecting the presence of Echinococcus granulosus specific deoxyribonucleic acid (DNA) by the polymerase chain reaction (PCR) could provide a definitive diagnosis of CE. An in-house PCR assay was devised to detect E. granulosus specific DNA in serum, urine and hydatid cyst fluid. The ability of the PCR to detect E. granulosus in the above mentioned samples were observed in comparison with other antigen and antibody detection tests. Serum samples from surgically confirmed patients of CE with ruptured cysts contained the corresponding DNA while the in the majority of cases who had an intact cyst had no DNA of E. granulosus in their serum. DNA of E. granulosus was not found to be excreted in urine. PCR performed equal to antigen detection ELISA while testing hydatid cyst fluid samples. Serum and urine might not serve as useful samples for the molecular diagnosis of cystic echinococcosis. However, PCR can be useful on serum samples to detect ruptured hydatid cysts and on hydatid cyst fluid to confirm the parasitic diagnosis.

  9. Defect diagnosis and root cause analysis for thrust roller bearing of centrifugal charging pump

    International Nuclear Information System (INIS)

    Guo Yi

    2012-01-01

    The centrifugal charging pump is one of the most important equipment for Nuclear power plant which requires very high reliability, during C9 fuel-cycle, the continuous high level vibration alarm happened on the centrifugal charging pump B, we diagnosed its faults correctly and selected the right operation mode and right time to dismantle it which ensure the safety and economic benefits of Nuclear power plant, and through deeply analysis the root causes of thrust bearing defaults, we can learn much from it especially for the diagnosis and analysis to the bearing faults which is common for rotating equipment. (author)

  10. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  11. Verification of medical diagnosis establishments with X radiation; Verificacion de establecimientos de diagnostico medico con rayos X

    Energy Technology Data Exchange (ETDEWEB)

    Azorin N, J. [Lider Nacional de Proteccion Radiologica, Comision Federal para la Proteccion contra Riesgos Sanitarios, Monterrey No. 33, Col. Roma, 06700 Mexico D. F. (Mexico)

    2008-12-15

    In regard to verification of medical diagnosis establishments with X radiation, it is very important to the coordination between the competent authorities such as the coordination achieved between the Federal Commission for the Protection against Sanitary Risks attached to the Health Secretary and the National Commission of Nuclear Safety and Safeguards, under the Energy Secretary. The Health Secretary found a subcommittee of environmental health standards to develop the Mexican Official Standards of medical diagnosis with X-rays, with the participation of over 50 institutions and experts in Mexico. The legal framework governing the procedures for health surveillance in radiology include the Health General Law, the Internal Regulation of the Health Secretary, the Regulation of the Federal Commission for the Protection against Sanitary Risks and the Mexican Official Standard NOM-229 SSA1 -2002, {sup T}echnical requirements for the facilities, health responsibilities, technical specifications for the equipment and radiation protection in medical diagnosis establishments with X-rays{sup .} Among the participated institutions in the revision of this standard were federal government agencies, public and private sector institutions, educational institutions and professional associations. The standard establishes criteria for design, construction and facilities maintenance, technical requirements for the acquisition and operation vigilance of equipment, health requirements and patient protection. Standard observance is for establishments that use X-ray generators for its application in humans with purposes of medical diagnosis either fixed or mobile units. It also contains aspects that must be observed by owners of establishments who hold formal, responsible, own X-ray equipment and consultants with expertise in radiation protection. In the field of diagnosis radiology the Federal Commission for the Protection against Sanitary Risks, has the mission to ensure the patients

  12. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  13. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  14. Exhaled nitric oxide in diagnosis and management of respiratory diseases

    Directory of Open Access Journals (Sweden)

    Abba Abdullah

    2009-01-01

    Full Text Available The analysis of biomarkers in exhaled breath constituents has recently become of great interest in the diagnosis, treatment and monitoring of many respiratory conditions. Of particular interest is the measurement of fractional exhaled nitric oxide (FENO in breath. Its measurement is noninvasive, easy and reproducible. The technique has recently been standardized by both American Thoracic Society and European Respiratory Society. The availability of cheap, portable and reliable equipment has made the assay possible in clinics by general physicians and, in the near future, at home by patients. The concentration of exhaled nitric oxide is markedly elevated in bronchial asthma and is positively related to the degree of esinophilic inflammation. Its measurement can be used in the diagnosis of bronchial asthma and titration of dose of steroids as well as to identify steroid responsive patients in chronic obstructive pulmonary disease. In primary ciliary dyskinesia, nasal NO is diagnostically low and of considerable value in diagnosis. Among lung transplant recipients, FENO can be of great value in the early detection of infection, bronchioloitis obliterans syndrome and rejection. This review discusses the biology, factors affecting measurement, and clinical application of FENO in the diagnosis and management of respiratory diseases.

  15. Evaluation of the performance characteristic for mammography by using edge device

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ki Won [Dept. of Radiology, Kyung Hee University Hospital at Gang-dong, Seoul (Korea, Republic of); Choi, Jwan Woo [Dept. of Radiology, Asan Medical Center, Seoul (Korea, Republic of); Jeong, Hoi Woun [Dept. of Radiological Technology, The Baekseok Culture University, Cheonan (Korea, Republic of); Jang, Seo Goo [Dept. of Medical Science, The Soonchunhyang University, Asan (Korea, Republic of); Lee, Eul Kyu [Dept. of Radiology, Inje Paik University Hospital Jeo-dong, Seoul (Korea, Republic of); Son, Soon Yong [Dept. of Radiological Technology, The Wonkwang Health Science University, Iksan (Korea, Republic of); Son, Jin Hyun; Min, Jung Whan [Dept. of Radiological Technology, The Shingu University, Sungnam (Korea, Republic of)

    2016-09-15

    The purpose of this study was to evaluation of the performance characteristic for mammography by using edge device that mammography equipment improves essential in the correct diagnosis for the maintenance. We measured the modulation transfer function (MTF), the noise power spectrum (NPS), and the detective quantum efficiency (DQE) using the 61267 RQA-M2 based on commission standard international electro-technical commission (IEC). As a results, spatial resolution of dimensions tomo and lorad selenia mammography were maintained at 10 mm-1 and NPS and DQE including the low nyquist frequency indicated to 6.0 mm-1. Therefore, regularly QA of mammography system should be necessary. This study can be contribute to evaluate QA for performance characteristic of mammography of DDR system.

  16. The performance investigation of a temperature cascaded cogeneration system equipped with adsorption desalination unit

    KAUST Repository

    Myat, Aung

    2013-02-01

    This paper presents the performance investigation of a temperature cascaded cogeneration plant, shortly in TCCP, equipped with an efficient waste heat recovery system. The TCCP or cogeneration system produces four types of useful energy namely (i) electricity, (ii) steam, (iii) cooling, and (iv) dehumidification and distilled water by utilizing single energy source. The TCCP comprises a Capstone C30 micro-turbine that generates nominal capacity of 26 kW of electricity, a compact and efficient waste heat recovery system and a host of waste heatactivated devices namely (i) a steam generator, (ii) an absorption chiller, (iii) an adsorption desalination system, and (iv) a multi-bed desiccant dehumidifier. The analysis is performed under different operation conditions such as heat source temperatures, flow rates of heat transfer fluids and chilled water inlet temperatures. The only single heat source for TCCP is obtained from exhaust gas of micro-turbine and it is channeled to a series of waste heat recovery heat exchangers to steam and hot water at different temperatures. Hot water produced by such a compact heat exchangers is the driving heat source to produce steam of 15 kg/h, cooling of 2 Rton, dehumidification of 2 Rton, and distilled water of 0.7 m3/day. A set of experiments, both part load and full load, of micro-turbine is conducted to examine the electricity generation and the exhaust gas temperature. It is observed that energy utilization factor could achieve as high as 70% while fuel energy saving ratio is found to be 28%. © 2013 Desalination Publications. All rights reserved.

  17. The performance investigation of a temperature cascaded cogeneration system equipped with adsorption desalination unit

    KAUST Repository

    Myat, Aung; Thu, Kyaw; Kim, Youngdeuk; Ng, K. C.

    2013-01-01

    This paper presents the performance investigation of a temperature cascaded cogeneration plant, shortly in TCCP, equipped with an efficient waste heat recovery system. The TCCP or cogeneration system produces four types of useful energy namely (i) electricity, (ii) steam, (iii) cooling, and (iv) dehumidification and distilled water by utilizing single energy source. The TCCP comprises a Capstone C30 micro-turbine that generates nominal capacity of 26 kW of electricity, a compact and efficient waste heat recovery system and a host of waste heatactivated devices namely (i) a steam generator, (ii) an absorption chiller, (iii) an adsorption desalination system, and (iv) a multi-bed desiccant dehumidifier. The analysis is performed under different operation conditions such as heat source temperatures, flow rates of heat transfer fluids and chilled water inlet temperatures. The only single heat source for TCCP is obtained from exhaust gas of micro-turbine and it is channeled to a series of waste heat recovery heat exchangers to steam and hot water at different temperatures. Hot water produced by such a compact heat exchangers is the driving heat source to produce steam of 15 kg/h, cooling of 2 Rton, dehumidification of 2 Rton, and distilled water of 0.7 m3/day. A set of experiments, both part load and full load, of micro-turbine is conducted to examine the electricity generation and the exhaust gas temperature. It is observed that energy utilization factor could achieve as high as 70% while fuel energy saving ratio is found to be 28%. © 2013 Desalination Publications. All rights reserved.

  18. Plant equipment services with laser metrology

    International Nuclear Information System (INIS)

    Hayes, J.H.; Kreitman, P.J.

    1995-01-01

    A new industrial metrology process is now being applied to support PWR Nuclear Plant Steam Generator Replacement Projects. The method uses laser tracking interferometry to perform as built surveys of existing and replacement plant equipment. This method provides precision data with a minimum of setup when compared to alternative methods available. In addition there is no post processing required to ascertain validity. The data is obtained quickly, processed in real time and displayed during the survey in the desired coordinate system. These capabilities make this method of industrial measure ideal for various data acquisition needs throughout the power industry, from internal/external equipment templating to area mapping. Laser tracking interferometry is an improvement on the present use of optical instruments and surveying technique. In order to describe the laser tracking interferometry measurement process, previous methods of templating and surveying are first reviewed

  19. A generalized development model for testing GPS user equipment

    Science.gov (United States)

    Hemesath, N.

    1978-01-01

    The generalized development model (GDM) program, which was intended to establish how well GPS user equipment can perform under a combination of jamming and dynamics, is described. The systems design and the characteristics of the GDM are discussed. The performance aspects of the GDM are listed and the application of the GDM to civil aviation is examined.

  20. The role of lubricant analysis in maximizing lubricant and equipment life

    International Nuclear Information System (INIS)

    Janis, J.

    1995-01-01

    Lubricant analysis has always played an important yet somewhat invisible role in equipment health monitoring. At its most primitive, simple observations and field testing alert equipment operators to changing conditions. At its most advanced, data from performance and analytical tests are used to develop or select optimum lubricants for service, stretch drain intervals, predict remaining equipment life and identify potential equipment or system problems at an incipient stage. Coupled with thermography and vibration analysis, lubricant analysis can become a major component of a comprehensive predictive maintenance (PM) program. Ontario Hydro finds itself at a turning point regarding the use and monitoring of lubricants. Increasing emphasis on equipment reliability and plant life extension, coupled with major, recent changes in lubricant composition in response to environmental, energy and safety concerns, forces an upgrading of many aspects of lubricant monitoring so that it may establish itself as a key part of modern PM practices. This paper discusses some of these aspects. (author)

  1. IEEE Std 323-1983: IEEE standard for qualifying Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic requirements for qualifying Class 1E equipment with interfaces that are to be used in nuclear power generating stations. The requirements presented include the principles, procedures, and methods of qualification. These qualification requirements, when met, will confirm the adequacy of the equipment design under normal, abnormal, design basis event, post design basis event, and in-service test conditions for the performance of safety function(s). The purpose of this standard is to identify requirements for the qualification of Class 1E equipment, including those interfaces whose failure could adversely affect the performance of Class 1E equipment and systems. The methods described shall be used for qualifying equipment, extending qualification, and updating qualification if the equipment is modified. Other issued IEEE standards which present qualification methods for specific equipment or components, or both, and those that deal with parts of the qualification program, may be used to supplement this standard, as applicable

  2. Trends in high performance compressors for petrochemical and natural gas industry in China

    Science.gov (United States)

    Zhao, Yuanyang; Li, Liansheng

    2015-08-01

    Compressors are the key equipment in the petrochemical and natural gas industry system. The performance and reliability of them are very important for the process system. The application status of petrochemical & natural gas compressors in China is presented in this paper. The present status of design and operating technologies of compressors in China are mentioned in this paper. The turbo, reciprocating and twin screw compressors are discussed. The market demands for different structure compressors in process gas industries are analysed. This paper also introduces the research and developments for high performance compressors in China. The recent research results on efficiency improvement methods, stability improvement, online monitor and fault diagnosis will also be presented in details.

  3. Equipment Obsolescence Analysis and Management Software

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.; Carret, L.; Shaon, S.; Schultz, C.

    2015-07-01

    The procurement engineering resources at Nuclear Power Plants (NPPs) are experiencing increasing backlog for procurement items primarily due to the inability to order the original replacement parts. The level of effort and time required to prepare procurement packages is increasing since the number of obsolete parts are increasing exponentially. Procurement packages for obsolete components and parts are much more complex and take more time to prepare because of the need to perform equivalency evaluations, testing requirements and test acceptance criteria development, commercial grade dedication or equipment qualification, and increasing efforts to verify that no fraudulent or counterfeit parts are procured. This problem will be further compounded when NPPs pursue license renewal and approval for plant-life extension. Advanced planning and advanced knowledge of equipment obsolescence is required to allow for sufficient time to properly procure replacement parts for obsolete items. The uncertain supply chain capability due to obsolescence is a real problem and can cause a risk to reliable plant operations due to the potential for a lack of available spare parts and replacement components to support outages and unplanned component failures. Advanced notification of obsolescence is increasingly more important to ensure that adequate time and planning is scheduled to procure the proper replacement parts. A thorough analysis of Original Equipment Manufacturer (OEM) availability and inventory as well as an analysis of failure rates and usage rates is required to predict critical part needs to allow for early identification of obsolescence issues so that a planned and controlled strategy to qualify replacement equipment can be implemented. (Author)

  4. Infections in the differential diagnosis of Bell's palsy: a plea for performing CSF analysis.

    Science.gov (United States)

    Henkel, Katrin; Lange, Peter; Eiffert, Helmut; Nau, Roland; Spreer, Annette

    2017-04-01

    Peripheral facial nerve palsy (FP) is the most common single nerve affection. Most cases are idiopathic, but a relevant fraction is caused by potentially treatable aetiologies including infections. Not all current diagnosis and treatment guidelines recommend routine cerebrospinal fluid (CSF) analysis in the diagnostic workup of this symptom. In this study, we evaluated frequency of aetiologies and relevance of CSF analysis in an interdisciplinary cohort. We retrospectively analysed all cases of newly diagnosed FP treated at a German university medical centre in a 3-year period. Diagnostic certainty was classified for infectious aetiologies according to clinical and CSF parameters. 380 patients with FP were identified, 63 children and 317 adults. Idiopathic Bell´s palsy was predominant in 61 %. 25 % of FP was attributed to infections, and other causes were identified in 14 %. Clinical presentation alone was not conclusive for infectious aetiology, in almost half of patients with infection-attributed FP the reported symptoms or clinical signs did not differ from common symptoms of idiopathic Bell`s palsy. Determination of C-reactive protein or white blood cell count was not helpful in the identification of infectious causes, and radiological imaging was performed in a high proportion of adult patients without conclusive results. Nuchal rigidity was found only in 7 % of patients with CSF pleocytosis. The predominant infectious agents were Borrelia burgdorferi, VZV and HSV, and in most of these cases diagnosis relied on the findings of CSF analysis. This study outlines the importance of careful differential diagnosis to identify infectious causes of facial nerve palsy. The high incidence and frequent unspecific clinical presentation of infectious FP underlines the importance of including CSF analysis in the diagnostic routine workup of FP.

  5. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  6. Design and construction of the Portable Industrial X-Ray Equipment

    International Nuclear Information System (INIS)

    Nguyen Phuc; Nguyen Van Si; Le Tien Quan; Trinh Anh Tuan; Nguyen Manh Hung; Trinh Dinh Tuong

    2011-01-01

    The main purposes of the project are the supporting to design and construction of the Portable Industrial X-Ray Equipment; with the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA. The Equipment is composed of control unit, X-ray generator, and power cable, connection cable. X-ray generator is assembling construction X-ray tube, H.V transformer together with gas insulation (SF6) are sealed up in aluminum bucked cabinet, fan and heat-sink are mounted in the end of X-ray generator as cooling, SF6 is a gas electrical performance to H.V. Alarm lamp is used to warn, flashing, show generating X-ray. Control unit is box construction. Four printed circuit boards (PCB) and electronic device are mounted in it. All operating buttons switches and displays are equipped on the panel. We have completed to design and construct the Portable Industrial X-Ray Equipment; and have tested the electronic parameters of all test points and the main parameters of equipment (the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA). We also have successful used the Portable Industrial X-Ray Equipment to evaluate the welds in industry. (author)

  7. New technologies in diagnosis of preinvasive cervical lesions

    Directory of Open Access Journals (Sweden)

    I. P. Aminodova

    2015-01-01

    Full Text Available Results of efficiency assessment of different diagnosis for preinvasive cervical lesions are represented in the article. During investigation the retrospective analysis of 353 patient histories of women with cervical intraepithelial neoplasia (primary and recurrent, who have been observed in Ivanovskiy regional oncological dispensary from 2002 to 2011, was performed. The accuracy rates of diagnosis of cervical intraepithelial neoplasia for one or several methods including cytological study, colposcopy and fluorescence cystoscopy were compared. Fluorescence diagnosis was performed with drug fotoditazin (LLC «VETA-GRAND», marketing authorisation №LS 001246 at dose of 1,0 mg/kg body weight. The final diagnosis was determined by results of histological study. The accuracy of cytological study accounted for 67,5–80,7%. Using colposcopy the exact diagnosis was determined in 67,9–74,4% of cases. Combination of cytological study with colposcopy improved the accuracy of diagnosis up to 82.1–88.9%. The superior results were for concurrent use of cytological study with colposcopy and fluorescence diagnosis – in such case the diagnosis was correct in 92,0–96,7% of patients. The analysis of results showed that using all methods of diagnosis the accuracy of diagnosis for recurrent cervical intraepithelial neoplasia was lower than for primary lesions. The decrease of diagnosis accuracy is probably related to previous diagnosis and therapeutic manipulations on cervix. Thus, multimodal diagnosis investigation with methods of fluorescence spectroscopy allows to improve accuracy of diagnosis for preinvasive cervical lesions. 

  8. Development of a telerobotic system for handling contaminated process equipment

    International Nuclear Information System (INIS)

    Fisher, J.J.; Ward, C.R.; Schuler, T.F.

    1987-01-01

    E. I. du Pont de Nemours and Company is evaluating a unique eight-degree-of-freedom Telerobot manipulator to perform size-reduction and material handling operations on contaminated process equipment at the Savannah River Plant (SRP). The Telerobot will be installed in the proposed Transuranic (TRU) Waste Processing Facility, which is scheduled to be operational by 1990. A full-scale prototype Telerobot, manufactured by GCA Corporation, St. Paul, MN is being tested with other process equipment in the Components Test Facility at the Savannah River Laboratory (SRL). All telerobotic operations required in the TRU Waste Facility such as crate unpacking, equipment dismantling, material size-reduction, and selected maintenance operations are being tested. This paper discusses the major mechanical and control features of the Telerobot system. Several system enhancements were added by SRL, including a new quick-hand-change coupling and expanded software control functions. The new software enables a system operator to perform both teleoperated and automatic tasks through several operating modes. These enhancements, as well as future mechanical, control system, and software features, are reviewed

  9. Thermal fatigue equipment to test joints of materials for high heat flux components

    International Nuclear Information System (INIS)

    Visca, E.; Libera, S.; Orsini, A.; Riccardi, B.; Sacchetti, M.

    2000-01-01

    The activity, carried out in the framework of an ITER divertor task, was aimed at defining a suitable method in order to qualify junctions between armour materials and heat sink of plasma-facing components (PFCs) mock-ups. An equipment able to perform thermal fatigue testing by electrical heating and active water-cooling was constructed and a standard for the sample was defined. In this equipment, during operation cycles, two samples are heated by thermal contact up to a relevant temperature value (350 deg. C) and then the water flow is switched on, thus producing fast cooling with time constants and gradients close to the real operating conditions. The equipment works with a test cycle of about 60 s and is suitable for continuous operation. A complete test consists of about 10000 cycles. After the assembling, the equipment and the control software were optimized to obtain a good reliability. Preliminary tests on mock-ups with flat CFC tiles joined to copper heat sink were performed. Finite-elements calculations were carried out in order to estimate the value of the thermal stresses arising close to the joint under the transient conditions that are characteristic of this equipment

  10. Development of a sludge lancing equipment and FOSAR technology

    International Nuclear Information System (INIS)

    Jeong, W. T.; Choi, Y. S.; Son, S. Y.; Hong, S. Y.

    2003-01-01

    A program for developing steam generator lancing equipment was started in 1999 on the request of the Chemistry Division of KHNP of Kori NPP No.1. Based on the program, KALANS r -I lancing system was developed firstly in Korea. Lancing equipments for Ulchin NPP No.2(KSNP) and Youngkwang NPP No.1 have been being developed since 2001. A project for developing FOSAR(Foreign Object Search and Retrieval) equipment has been being developed since 2001. The FOSAR equipment is going to automate the search and retrieval operation which has been manual, thus minimizes radiation exposure and improves the performance of inspection work. Besides, a research to evaluate the feasibility of an ultrasonic cleaning method is also under consideration. A project to develop an Upper Bundle Hydraulic Cleaning (UBHC) system was started on May 2003. In this paper, a steam generator lancing system for Kori NPP No.1 is presented. A research activities for developing FOSAR(Foreign Object Search and Retrieval) system, UBHC(Upper Bundle Hydraulic Cleaning) system, and ultrasonic cleaning system are also presented briefly

  11. [Equipment design for magnetic therapy and "Polus" devices].

    Science.gov (United States)

    Viktorov, V A; Malkov, Iu V

    1994-01-01

    Low-frequency magnetotherapy is among the most original therapeutical techniques since it is effective in treating most diseases and has practically no contraindications. Due to atraumaticity of a low-frequency electromagnetic field, the application of magnetotherapy is indicated in geriatric care, in particular. The VNIIMP-VITA Joint-Stock Company has developed a family of the Polyus system equipment for magnetotherapy, whereby all the well-known therapeutical procedures of low-frequency magnetotherapy can be performed. The magnetotherapeutic room equipped with Polyus-2D, Polyus-3, and Polyus-4 ensures a complete set of magneto-therapeutical exposure. The rooms are supplied by the VNIIMP-VITA Joint-Stock Company.

  12. Organizational diagnosis: a six-box model.

    Science.gov (United States)

    Stahl, D A

    1997-04-01

    Six categories are used to perform an organizational diagnosis: purposes, structure, relationships, rewards, leadership and helpful mechanisms. A subacute care organization's diagnosis can determine the appropriateness and profitability of its current business, any gaps that must be rectified and the action plan that must be undertaken.

  13. Seismic soil-structure-equipment interaction analysis of unit 5/6, Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Kostov, M [Bulgarian Academy of Sciences, Central Laboratory for Seismic Mechanics and Earthquake Engineering, Sofia (Bulgaria)

    1995-07-01

    This research project is aimed to analyse problems of soil-structure-equipment interaction under seismic excitation in case of Kozloduy NPP. Reevaluation and upgrading of Kozloduy NPP has started after 1977 Vrancea earthquake. New Safe Shutdown Earthquake (SSE) level was defined, upgrading most of structural equipment was performed, seismic instrumentation was installed. New investigations were initiated after 1990 IAEA mission visited the site. A comprehensive site confirmation project was started with a subsequent structural and equipment reevaluation and upgrading. This work deals with Units 5 and 6 of WWER-1000 type only.

  14. Competitive assessment of the US: Renewable energy equipment industry

    Energy Technology Data Exchange (ETDEWEB)

    1984-12-01

    This report is a competitive assessment of the U.S. renewable energy equipment industry. The contents include: Definition of technologies; Industry characteristics; Historical perspectives; Industry performance; Trends and projections; The world marketplace; and Issues and options.

  15. 47 CFR 2.933 - Change in identification of equipment.

    Science.gov (United States)

    2010-10-01

    ... number or trade name performed in accordance with the provisions in § 2.924 of this chapter is not...) or § 2.1033(c)(12) showing the exterior appearance of the equipment, including the operating controls...

  16. Fault detection and diagnosis in nonlinear systems a differential and algebraic viewpoint

    CERN Document Server

    Martinez-Guerra, Rafael

    2014-01-01

    The high reliability required in industrial processes has created the necessity of detecting abnormal conditions, called faults, while processes are operating. The term fault generically refers to any type of process degradation, or degradation in equipment performance because of changes in the process's physical characteristics, process inputs or environmental conditions. This book is about the fundamentals of fault detection and diagnosis in a variety of nonlinear systems which are represented by ordinary differential equations. The fault detection problem is approached from a differential algebraic viewpoint, using residual generators based upon high-gain nonlinear auxiliary systems (‘observers’). A prominent role is played by the type of mathematical tools that will be used, requiring knowledge of differential algebra and differential equations. Specific theorems tailored to the needs of the problem-solving procedures are developed and proved. Applications to real-world problems, both with constant an...

  17. Logarithmic Similarity Measure between Interval-Valued Fuzzy Sets and Its Fault Diagnosis Method

    Directory of Open Access Journals (Sweden)

    Zhikang Lu

    2018-02-01

    Full Text Available Fault diagnosis is an important task for the normal operation and maintenance of equipment. In many real situations, the diagnosis data cannot provide deterministic values and are usually imprecise or uncertain. Thus, interval-valued fuzzy sets (IVFSs are very suitable for expressing imprecise or uncertain fault information in real problems. However, existing literature scarcely deals with fault diagnosis problems, such as gasoline engines and steam turbines with IVFSs. However, the similarity measure is one of the important tools in fault diagnoses. Therefore, this paper proposes a new similarity measure of IVFSs based on logarithmic function and its fault diagnosis method for the first time. By the logarithmic similarity measure between the fault knowledge and some diagnosis-testing samples with interval-valued fuzzy information and its relation indices, we can determine the fault type and ranking order of faults corresponding to the relation indices. Then, the misfire fault diagnosis of the gasoline engine and the vibrational fault diagnosis of a turbine are presented to demonstrate the simplicity and effectiveness of the proposed diagnosis method. The fault diagnosis results of gasoline engine and steam turbine show that the proposed diagnosis method not only gives the main fault types of the gasoline engine and steam turbine but also provides useful information for multi-fault analyses and predicting future fault trends. Hence, the logarithmic similarity measure and its fault diagnosis method are main contributions in this study and they provide a useful new way for the fault diagnosis with interval-valued fuzzy information.

  18. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  19. Improvement of Productivity in TIG Welding Plant by Equipment Design in Orbit

    Science.gov (United States)

    Gnanavel, C.; Saravanan, R.; Chandrasekaran, M.; Jayakanth, J. J.

    2017-03-01

    Measurements and improvements are very indispensable task at all levels of management. Here some samples are, at operator level: Measuring operating parameters to ensure OEE (Overall Equipment Effectiveness) and measuring Q components performance to ensure quality, at supervisory level: measuring operator’s performance to ensure labour utility at managerial level: production and productivity measurements and at top level capital and capacity utilization. An often accepted statement is “Improvement is impossible without measurement”. Measurements often referred as observation. The case study was conducted at Government Boiler factory in India. The scientific approach followed for indentifying non value added activities. Personalised new equipment designed and installed to achieve productivity improvement of 85% for a day. The new equipment can serve 360o around its axis hence it simplified loading and unloading procedures as well as reduce their times and ensured effective space and time.

  20. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...