WorldWideScience

Sample records for equipment needed detailed

  1. Specialized equipment needs for the transportation of radioactive material

    International Nuclear Information System (INIS)

    Condrey, D.; Lambert, M.

    1998-01-01

    To ensure the safe and reliable transportation of radioactive materials and components, from both the front and back-end of the nuclear fuel cycle, a transport management company needs three key elements: specialized knowledge, training and specialized equipment. These three elements result, in part, from national and international regulations which require specialized handling of all radioactive shipments. While the reasons behind the first two elements are readily apparent, the role of specialized equipment is often not considered until too late shipment process even though it plays an integral part of any radioactive material transport. This paper will describe the specialized equipment needed to transport three of the major commodities comprising the bulk of international nuclear transports: natural uranium (UF6), low enriched uranium (UF6) and fresh nuclear fuel. (authors)

  2. Equipment for welding of details and joints of plastic pipes in work shop conditions and at pipelines

    International Nuclear Information System (INIS)

    Doronin, V.A.

    1988-01-01

    A range of welding machines for operation in workshop conditions and at pipelines is presented. Set of welding equipment for mobile shop, producing prototypes, and mobile facility are developed. In 1989 they will provide the whole operation cycle of production and mounting of details and units of plastic tubes and will enable to organize the centralized production of welded and shaped details in the branch, thus excluding the shortage of these details. 8 refs.; 6 figs.; 2 tabs

  3. Meeting needs for rehabilitation equipment and home adjustments among the disabled in their life environment

    Directory of Open Access Journals (Sweden)

    Barbara Kołłątaj

    2015-09-01

    Both the provision of orthopaedic equipment and adjustment of the home to disability are insufficient with respect to the needs. The meeting of these needs is significantly conditioned by high or very high material standard. The lack or incomplete satisfaction with the needs for rehabilitation equipment is associated with a relatively younger age, independent, single residence and low material standard. Living in an residential home means better adjustment of the living environment, and better provision with orthopaedic and rehabilitation equipment.

  4. Meeting needs for rehabilitation equipment and home adjustments among the disabled in their life environment

    Directory of Open Access Journals (Sweden)

    Barbara Kołłątaj

    2015-09-01

    Full Text Available Introduction. The elimination of functional barriers resulting from disability through the provision of adequate orthopaedic and rehabilitation equipment, and homes adjusted for disability is the precondition for an efficient and independent functioning, and high quality of life of the disabled. The objective of the study was recognition of the needs of the disabled declared by them, and the degree of satisfaction with these needs. Methods. The study covered 478 disabled from the Lublin Region. The research instrument was the ‘Questionnaire for the Disabled’ designed by the authors. Results. Considering the needs expressed by the respondents concerning the provision of orthopaedic and rehabilitation equipment and meeting these needs, four groups were distinguished: No Needs – 30.1%, Needs Partially Met – 22.4%, Needs Fully Met – 37.7%, Needs Not Met – 9.8%. The group Needs Not Met was characterized by younger age, in the group Needs Partially Met worse indicators of the state of health were noted, more frequent independent living, loneliness and low material standard. Considering the expressed needs for home adjustments adequate to disability and meeting these needs, three groups were distinguished: No Needs – 59.6%, Needs Not Met – 15.9%, and Needs Met – 24.7%. The group Needs Not Met more rarely covered respondents living in residential homes, compared to those living independently in rural or urban areas. The group Needs Met more rarely included rural inhabitants, while more frequently including the disabled who had a high material standard. Conclusions. Both the provision of orthopaedic equipment and adjustment of the home to disability are insufficient with respect to the needs. The meeting of these needs is significantly conditioned by high or very high material standard. The lack or incomplete satisfaction with the needs for rehabilitation equipment is associated with a relatively younger age, independent, single

  5. Evaluation formulas of manpower needs for dismantling of equipments in uranium refining and conversion plant

    International Nuclear Information System (INIS)

    Izumo, Sari; Usui, Hideo; Kubota, Shintaro; Tachibana, Mitsuo; Kawagoshi, Hiroshi; Tokuyasu, Takashi; Takahashi, Nobuo; Morimoto, Yasuyuki; Tanaka, Yoshio; Sugitsue, Noritake

    2014-07-01

    Japan Atomic Energy Agency has developed PROject management data evaluation code for DIsmantling Activities (PRODIA) to make an efficient decommissioning for nuclear facilities. PRODIA is a source code which provides estimated value such as manpower needs, costs, etc., for dismantling by evaluation formulas according to the type of nuclear facility. Evaluation formulas of manpower needs for dismantling of equipments about reprocessed uranium conversion in Uranium Refining and Conversion Plant (URCP) have been developed in this report. In the result, evaluation formulas of manpower needs for dismantling of equipment were derived based on the classifications of equipment's functions or work items. These evaluation formulas are widely applicable to the estimation of the manpower needs for dismantling the other nuclear facilities, in particular uranium handling facilities. It was confirmed that some of these evaluation formulas with the same applicable condition could be unified to some inclusive evaluation formulas. It turned out that all steel equipment contaminated by uranium could be evaluated by one evaluation formula. (author)

  6. Young children with cerebral palsy: families self-reported equipment needs and out-of-pocket expenditure.

    Science.gov (United States)

    Bourke-Taylor, H; Cotter, C; Stephan, R

    2014-09-01

    Costs to families raising a child with cerebral palsy and complex needs are direct and indirect. This study investigated the self-reported real-life costs, equipment needs, and associated characteristics of children who had the highest equipment and care needs. The purposive sample (n = 29) were families with a child with cerebral palsy: gross motor function levels 5 (n = 20), level 4 (n = 5), level 3 (n = 4); complex communication needs (n = 21); medical needs (n = 14); hearing impairment (n = 5) and visual impairment (n = 9). Participants completed a specifically designed survey that included the Assistance to Participate Scale. Equipment and technology purchases were recorded in the areas of positioning, mobility, transport, home modifications, communication, splinting and orthoses, self-care, technology, communication devices, medical, adapted toys/leisure items and privately hired babysitters/carers. Descriptive and inferential statistics were used to analyse the data. Families had purchased up to 25 items within the areas described. The highest median number of items were recorded for positioning (15 items), mobility devices (9 items) and adapted toys/leisure items (9 items). Median costs were highest for home modifications (AUD$23000), transport (AUD$15000), splints and orthoses (AUD$3145), paid carers (AUD$3080), equipment for toileting/dressing/bathing (AUD$2900) and technical/medical items ($2380). Children who needed more parental assistance to participate in play and recreation also required significantly more equipment overall for positioning, communication, self-care and toys/leisure. The equipment needs of young children with complex disability are extensive and out-of-pocket expenses and parental time to support participation in play/recreation excessive. Substantial financial support to offset costs are crucial to better support families in this life situation. © 2013 John Wiley & Sons Ltd.

  7. Regulation No. 56/2006 Coll. of the Nuclear Regulatory Authority of the Slovak Republic dated as of January 12, 2006 on details concerning requirements for quality system documentation of authorisation holder, as well as details concerning quality requirements for nuclear installations, details concerning quality requirements for classified equipment and details concerning the scope of their approval

    International Nuclear Information System (INIS)

    2006-01-01

    This Regulation provides details of the requirements for quality system documentation holder, details of the quality requirements for nuclear installations, details concerning quality requirements for classified equipment and details of the scope of their approval. This Regulation came into force on March 1, 2006.

  8. Production equipment development needs for a 700 metric ton/year light water reactor mixed oxide fuel manufacturing plant

    International Nuclear Information System (INIS)

    Blahnik, D.E.

    1977-09-01

    A literature search and survey of fuel suppliers was conducted to determine how much development of production equipment is needed for a 700 metric tons/y LWR mixed-oxide (UO 2 --PuO 2 ) fuel fabrication plant. Results indicate that moderate to major production equipment development is needed in the powder and pellet processing areas. The equipment in the rod and assembly processing areas need only minor development effort. Required equipment development for a 700 MT/y plant is not anticipated to delay startup of the plant. The development, whether major or minor, can be done well within the time frame for licensing and construction of the plant as long as conventional production equipment is used

  9. Homemade Equipment for the Teaching of Electrochemistry at Advanced Level. Part II.

    Science.gov (United States)

    Chan, K. M.

    1985-01-01

    Provides a detailed description for the construction of equipment needed to investigate acid/base equilibria through the measurement of pH and potentiometric titrations. Suggested experiments and calibration techniques are explained. This information helps to solve the problems of inadequate, expensive equipment required for A-level chemistry…

  10. The critical role of community-based micro-grants for disability aids and equipment: results from a needs analysis.

    Science.gov (United States)

    Muenchberger, Heidi; Ehrlich, Carolyn; Parekh, Sanjoti; Crozier, Michelle

    2016-01-01

    To investigate the role of philanthropic micro-grants (maximum of $10,000) in the provision of aids and equipment for adults (aged 18-65 years of age) with complex disabilities and examine key trends in aids and equipment requests. This study examined, through quantitative and qualitative analysis, aids and equipment requests (n = 371 individual applications as represented by 136 service organisations in three Australian states) received by a not-for-profit (NFP) organisation across five consecutive years of an innovative micro-grants scheme. Findings highlight that living situation (living with family or living independently) significantly influences the nature of requests for respite, aids, equipment and home modifications. Specifically, people with complex disabilities living with their families require greater combined service provision (higher equipment need, respite support, home modifications) than those living independently (equipment need only). Type of disability did not influence request type. Qualitative data further indicated the "last resort" nature of respite requests, particularly for younger applicants (under 45 years of age) indicating critical unmet needs in the community. Results demonstrate the vital role of NFP organisations and philanthropic funds in supporting daily lifestyle aids and equipment (including respite) that might otherwise not be funded for people with complex disabilities. Although preliminary in its scope and prior to implementation of a National Disability Insurance Scheme (NDIS) in Australia, findings suggest both opportunity and risk to the uptake of community-based micro-grant funding: opportunity for users through the provision of essential aids and lifestyle supports, and risk through over-subscription and devolving of responsibility for critical support resources from public sector. The aids and equipment needs of adults under the age of 65 appear to have been underestimated, poorly defined and under

  11. ADVANCING THE PROCESSING TECHNOLOGIES OF THE DETAILS OF CONSTRUCTION MACHINERY AND EQUIPMENT

    Directory of Open Access Journals (Sweden)

    Burlachenko Oleg Vasil’evich

    2016-03-01

    Full Text Available On the contemporary stage on the development and advancement of processing technologies of machine and equipment details it is necessary to find a complex solution to the problem of their performance characteristics. This solution supposes the development of specific methods providing and advancing some specific index of performance efficiency (often regardless of real coupling state and the creation and implementation of the technologies having complex physical and technical impacts on the contact combination. The novelty of processing methods is determined by all the components of the technological system, each of which has its own novelty or creates the novelty of the system as a whole due to definite non-traditional combination of the known components. The system of improving the existing and creating new methods and technological processes of manufacturing the products is considered. The mechanical, physical and chemical effects on the work surface in case of specific kinematics of tool path and the workpieces during operation, and also the wear of engine cylinders are analyzed. The authors offer a technology of obtaining nonporous hot-stamped powder alloys with higher strength properties of the outer surface and high plastic properties of core. The unity of the processes of power, temperature and other effects on the working surface of details during their manufacture and operation is established.

  12. Recent developments in the detailed modelling of power house environmental conditions using GOTHIC

    International Nuclear Information System (INIS)

    Wong, R.C.; Fluke, R.J.; Yim, K.; Rossitter, B.G.

    1997-01-01

    Environmental qualification of safety equipment in the powerhouse requires detailed information on the predicted harsh conditions that can arise following a steam line break. Although lumped parameter codes provide quick assessments of global conditions, the results are unsatisfactory because the spatial detail needed to evaluate specific equipment, or indeed to optimize and confirm the design adequacy of mitigating features, is not available. To overcome these problems, new models have been developed to provide detailed three-dimensional information using the GOTHIC code. Furthermore, new animated graphical displays help the designer visualize and fully comprehend the buoyancy driven steam flow within the powerhouse. This has lead to quick optimization of the placement, size and opening time of the emergency venting system, thereby mitigating the conditions for which safety equipment must be qualified. This has resulted in significant cost savings for the environmental qualification programme. (author)

  13. Prototypical spent nuclear fuel rod consolidation equipment: Phase 2, Final design report: Volume 1, Detailed design

    International Nuclear Information System (INIS)

    Blissell, W.H.; Ciez, A.P.; Goedicke, F.E.; Bessko, C.

    1987-01-01

    This document describes the Westinghouse Final Design for the Prototypical Spent Fuel Consolidation Equipment Demonstration Project. This design represents a fully qualified, licensable, cost effective spent fuel rod consolidation system. As a result of significant concerns raised by DOE and its Technical Review Committee during the 30% Design Review, significant changes were made to the original Preliminary Design resulting from Phase I activities. These changes focused on increased automation, end fitting removal, the rod pulling process and the need to maintain the consolidation canisters as clean as possible. As a result of these changes, the new system is greatly enhanced with a much greater probability of meeting or exceeding the project functional requirements. As a result of delays in resolving cost and contractual differences, additional bench testing was not conducted during Phase II. It is however our belief that the current design exceeds the 90% confidence level required by DOE because of the confidence gained from the Phase I tests, the additional engineering detail completed and the fact that our rod pulling tool has been demonstrated in a similar application at Oconee while our ID tube cutter is a modified (mounting method only) off-the-shelf design. 7 refs., 49 figs., 36 tabs

  14. Low-level laser therapy equipment needs calibration before clinical use

    Science.gov (United States)

    Machado de Senna, André; Machado-de-sena, Rosa Maria; Facundes, Arseni Lázaro; Barros Nepomuceno, Patrícia; Sávya Florentino, Wanilza; Olegário de Araújo, Ronyere

    2018-04-01

    Many factors can influence the radiant power delivered by the low-level laser therapy (LLLT) equipment, such as its cleaning and condition, as well as the use of plastic films for protecting the laser or even its time of use. Radiant power is an important factor to consider because it affects the amount of energy delivered to the target tissue. The difference between real radiant power (RRP) and nominal radiant power (NRP) may interfere in the expected results, because the delivered energy is different from the desired energy. Purpose: The objective of this study was to compare the NRP with the RRP offered by LLLT devices under clinical conditions of use. Material and Methods: For data collection to this study, 61 LLLT devices used in private and public dental practices in the state of Tocantins, Brazil, were evaluated. Three consecutive power measurements were performed at one-minute intervals and then the average of the measured power was calculated. The RRP was compared to the NRP. Results: The equipment presented NRP from 30 to 500mW while RRP ranged from 17.3 to 107.0mW. Discussion and Conclusion: The mean power measured in clinical conditions of use of the laser equipment was different from the nominal power reported by the manufacturers of the devices (p<0,01). The RRP ranged between 12.92% and 107% of NRP. This fact is worrisome, since one of the most important parameters for the success of the treatment of an injury using LLLT is the energy (power x time) delivered. These findings reinforce the need of calibrating the equipment before each laser application in order to avoid failures in the therapeutic conduct.

  15. Overexposure of patients due to malfunctions or defects in radiation equipment

    International Nuclear Information System (INIS)

    Gill, J.R.

    1992-01-01

    Some 38 incidents involving patient overexposure due to malfunctions or defects in radiation equipment were notified to HSE between 1986 and 1990. Of these cases, 30 involved diagnostic X ray equipment, while the remainder involved nuclear medicine or radiotherapy equipment. Those cases involving X ray equipment are examined in detail and grouped into six categories. The numbers of patients affected varied. In one case an estimated 350 patients were affected: in another, 240; while 13 cases affected only a single patient. A very rough estimate of the collective effective dose equivalent in the 30 cases comes to 5 man sieverts. It is concluded that improvements are needed in fault finding procedures, and guidance is needed on consistent methods of dose estimation and reporting. Improvements for the longer term include the selection of reliable components during manufacture; application of HSE guidance in software design for programmable electronic systems; and equipment design to incorporate fault detection and inhibition of operation to prevent excessive exposures

  16. Equipment aging: an overview of status and research needs

    International Nuclear Information System (INIS)

    Carfagno, S.P.

    1982-01-01

    The problem of equipment aging in nuclear power generating stations is viewed from the standpoint of the qualification of safety-related equipment. A brief summary of developments related to equipment aging and qualification (in industry, the regulatory arena, and in the research area) is presented to focus on the current status of the problem. Several research topics are suggested for consideration as components of any general plan of research on plant aging. Among these is a topic concerned with an effort to establish the relative merit of different approaches to account for the functional degradation of equipment in terms of their cost and their contribution to assurance of public safety and a topic to investigate ways to improve the monitoring of functional degradation of equipment in service. Some factors to be considered in choosing among research topics and in establishing funding levels are mentioned

  17. Equipment for biomass. Wood burners; Materiels pour la biomasse, les chaudieres bois

    Energy Technology Data Exchange (ETDEWEB)

    Chieze, B. [SA Compte R., 63 - Arlanc (France)

    1997-12-31

    A review of the French classification of biomass wastes (and more especially wood and wood wastes) concerning classified burning equipment, is presented: special authorization is thus needed for burning residues from wood second transformation processes. Limits for combustion product emission levels are detailed and their impact on wood burning and process equipment is examined: feeder, combustion chamber, exchanger, fume treatment device, residue disposal. Means for reducing pollutant emissions are reviewed

  18. Improvement of equipment needed for the detection and characterization of nuclear material and radioactive samples at borders

    International Nuclear Information System (INIS)

    Arlt, R.; Kovar, A.; Swoboda, M.; Beck, P.; Duftschmid, K.E.; Lewis, W.

    2001-01-01

    Nuclear radiation measurement instruments and devices for the detection and characterisation of nuclear material and radioactive isotopes at borders play a decisive role in the set of technical measures needed to deal with the problem of illicit trafficking. Therefore the availability of a range of devices with adequate performance at affordable prices is essential. The needed equipment can be classified into the following categories: Detection equipment (border monitors and radiation pagers); Hand held devices for neutron/gamma source search and in-field characterisation of radiation sources by customs inspectors; NDA (non-destructive assay) instruments for in-depth investigation of a seized item by experts either in the field or under laboratory conditions. Instruments and techniques, which use destructive assay methods, are not considered in this paper. The most recent overview on the performance of such instruments is given in the Final Report of ITRAP (Illicit Trafficking Radiation Detection Assessment Program). According to the findings of ITRAP, although in all above mentioned categories equipment is commercially available, deficiencies and shortcomings were identified. In this paper we describe our effort in addressing some of the most essential equipment problems, identified in ITRAP - the sensitivity of border monitors with respect to the detection of nuclear material and the performance and usability of hand held and portable devices needed for in-field characterisation of seized items by customs inspectors

  19. The Soleil detailed pre-project report

    International Nuclear Information System (INIS)

    1999-01-01

    The aim of the joint CNRS/CEA Soleil project was to develop a facility equipped with several synchrotron radiation sources and their associated experimental devices in order to answer the estimated research needs in this domain for the 20 to 30 forthcoming years. This document is the detailed pre-project. It describes the studies carried out and relative to the infrastructures and buildings, to the accelerators and light sources (storage ring, injector, radiation production), to the program of experiments, to the computer science aspects, and to the administrative and organisational aspects. (J.S.)

  20. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  1. Exploring Service-led Growth Trajectories for Analytical Equipment Providers

    DEFF Research Database (Denmark)

    Raja, Jawwad; Frandsen, Thomas; Mouritsen, Jan

    2016-01-01

    This paper examines the dilemmas encountered by advanced analytical equipment providers in developing service-led growth strategies to expand their business in pursuit of more attractive revenue models. It does so by adopting a case based research approach. The findings detail the capabilities...... and solutions-in different contexts, with a view to expanding markets and developing solution based business models, are discussed. It is argued that analytical equipment providers encounter dilemmas as managing these different trajectories implies different needs in terms of the technological sophistication...... of equipment required. This does not necessarily imply that one context is less complex than the other, but rather suggests that the role of integration is qualitatively different and that the relationship between product and service varies when developing solutions in these different arenas....

  2. Image quality analysis of digital mammographic equipments

    Energy Technology Data Exchange (ETDEWEB)

    Mayo, P.; Pascual, A.; Verdu, G. [Valencia Univ. Politecnica, Chemical and Nuclear Engineering Dept. (Spain); Rodenas, F. [Valencia Univ. Politecnica, Applied Mathematical Dept. (Spain); Campayo, J.M. [Valencia Univ. Hospital Clinico, Servicio de Radiofisica y Proteccion Radiologica (Spain); Villaescusa, J.I. [Hospital Clinico La Fe, Servicio de Proteccion Radiologica, Valencia (Spain)

    2006-07-01

    The image quality assessment of a radiographic phantom image is one of the fundamental points in a complete quality control programme. The good functioning result of all the process must be an image with an appropriate quality to carry out a suitable diagnostic. Nowadays, the digital radiographic equipments are replacing the traditional film-screen equipments and it is necessary to update the parameters to guarantee the quality of the process. Contrast-detail phantoms are applied to digital radiography to study the threshold contrast detail sensitivity at operation conditions of the equipment. The phantom that is studied in this work is C.D.M.A.M. 3.4, which facilitates the evaluation of image contrast and detail resolution. One of the most extended indexes to measure the image quality in an objective way is the Image Quality Figure (I.Q.F.). This parameter is useful to calculate the image quality taking into account the contrast and detail resolution of the image analysed. The contrast-detail curve is useful as a measure of the image quality too, because it is a graphical representation in which the hole thickness and diameter are plotted for each contrast-detail combination detected in the radiographic image of the phantom. It is useful for the comparison of the functioning of different radiographic image systems, for phantom images under the same exposition conditions. The aim of this work is to study the image quality of different images contrast-detail phantom C.D.M.A.M. 3.4, carrying out the automatic detection of the contrast-detail combination and to establish a parameter which characterize in an objective way the mammographic image quality. This is useful to compare images obtained at different digital mammographic equipments to study the functioning of the equipments. (authors)

  3. Image quality analysis of digital mammographic equipments

    International Nuclear Information System (INIS)

    Mayo, P.; Pascual, A.; Verdu, G.; Rodenas, F.; Campayo, J.M.; Villaescusa, J.I.

    2006-01-01

    The image quality assessment of a radiographic phantom image is one of the fundamental points in a complete quality control programme. The good functioning result of all the process must be an image with an appropriate quality to carry out a suitable diagnostic. Nowadays, the digital radiographic equipments are replacing the traditional film-screen equipments and it is necessary to update the parameters to guarantee the quality of the process. Contrast-detail phantoms are applied to digital radiography to study the threshold contrast detail sensitivity at operation conditions of the equipment. The phantom that is studied in this work is C.D.M.A.M. 3.4, which facilitates the evaluation of image contrast and detail resolution. One of the most extended indexes to measure the image quality in an objective way is the Image Quality Figure (I.Q.F.). This parameter is useful to calculate the image quality taking into account the contrast and detail resolution of the image analysed. The contrast-detail curve is useful as a measure of the image quality too, because it is a graphical representation in which the hole thickness and diameter are plotted for each contrast-detail combination detected in the radiographic image of the phantom. It is useful for the comparison of the functioning of different radiographic image systems, for phantom images under the same exposition conditions. The aim of this work is to study the image quality of different images contrast-detail phantom C.D.M.A.M. 3.4, carrying out the automatic detection of the contrast-detail combination and to establish a parameter which characterize in an objective way the mammographic image quality. This is useful to compare images obtained at different digital mammographic equipments to study the functioning of the equipments. (authors)

  4. Trends in exploration and exploration equipment for uranium

    International Nuclear Information System (INIS)

    Raitz, C.H.

    1976-01-01

    Uranium exploration once again is in a ''boom'' cycle. The energy needs of the OPEC and non-OPEC countries alike have created a demand for uranium which appears certain to increase in future years. In turn, this demand has stimulated a dramatic rise in both the price of uranium and the exploration activity necessary to discover new reserves. One immediate reaction to the sudden increase in uranium exploration activity has been the evaluation of old exploration methods and equipment. This paper briefly reviews some of the traditional equipment and techniques which currently are being refined and updated. Undoubtedly this equipment, complemented with good exploration planning and judgment, will continue to be relied upon for many years and will lead to the discovery of many new deposits. The paper also covers in greater detail some of the newer, less conventional techniques and equipment now being introduced for uranium exploration. These new methods may be expected to keep this country in the forefront among the uranium producers of the world

  5. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  6. A Comparison of Certain Knowledges in Agriculture Needed by Workers in Farming, in Grain Elevator Businesses, and in Agricultural Equipment Businesses.

    Science.gov (United States)

    Fiscus, Keith Eugene

    Questionnaires to determine the vocational and technical education needed by prospective workers in farming and in grain elevator and agricultural equipment businesses were administered to 20 workers in each of the jobs of (1) farm manager, (2) grain elevator manager, operator, salesman, and deliveryman, and (3) agricultural equipment manager,…

  7. Shuttle orbiter Ku-band radar/communications system design evaluation. Deliverable test equipment evaluation

    Science.gov (United States)

    Maronde, R. G.

    1980-07-01

    The Ku-band test equipment, known as the Deliverable System Test equipment (DSTE), is reviewed and evaluated. The DSTE is semiautomated and computer programs were generated for 14 communication mode tests and 17 radar mode tests. The 31 test modules provide a good cross section of tests with which to exercise the Ku-band system; however, it is very limited when being used to verify Ku-band system performance. More detailed test descriptions are needed, and a major area of concern is the DSTE sell-off procedure which is inadequate.

  8. Waste Handling Equipment Development Test and Evaluation Study

    International Nuclear Information System (INIS)

    R.L. Tome

    1998-01-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M and O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T and EP), Reference 5.1, was used as a basis for this study. The MGR T and EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T and EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T and EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  9. The need for detailed gender-specific occupational safety analysis.

    Science.gov (United States)

    Cruz Rios, Fernanda; Chong, Wai K; Grau, David

    2017-09-01

    The female work in population is growing in the United States, therefore the occupational health and safety entities must start to analyze gender-specific data related to every industry, especially to nontraditional occupations. Women working in nontraditional jobs are often exposed to extreme workplace hazards. These women have their safety and health threatened because there are no adequate policies to mitigate gender-specific risks such as discrimination and harassment. Employers tend to aggravate this situation because they often fail to provide proper reporting infrastructure and support. According to past studies, women suffered from workplace injuries and illnesses that were less prominent among men. Statistics also confirmed that men and women faced different levels of risks in distinct work environments. For example, the rates of workplace violence and murders by personal acquaintances were significantly higher among women. In this paper, the authors analyze prior public data on fatal and nonfatal injuries to understand why we need to differentiate genders when analyzing occupational safety and health issues. The analyses confirmed that women dealt with unique workplace hazards compared to men. It is urgent that public agencies, such as the U.S. Department of Labor, record gender-specific data in details and by occupations and industries. The reader will become aware of the current lack - and need - of data and knowledge about injuries and illnesses separated by gender and industry. Finally, safety and health researchers are encouraged to investigate the gender-specific data in all industries and occupations, as soon as they become available. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  10. Questionnaire survey of ultrasonography at centers equipped for detailed breast cancer screening

    International Nuclear Information System (INIS)

    Shiraiwa, Misaki; Endo, Tokiko; Morita, Takako; Niwa, Tae; Oiwa, Mikinao; Nishida, Chikako

    2012-01-01

    To ascertain the current status of ultrasonography in mammographic (MG) screening at centers equipped for detailed examination and to clarify the related issues, a questionnaire was sent to 181 centers, exclusive of those providing only medical check-ups, recognized by the Central Committee for Quality Control of Mammographic Screening in 7 prefectures of Chubu District. Of the 99 centers that returned the questionnaire (response rate, 54.7%), 82 answered ''yes'' to the use of breast ultrasound in clinical practice, in which the actual state of breast ultrasonography was analyzed. Examinations were performed by doctors alone at 24 centers, doctors and non-doctors at 40, and non-doctors alone at 18. Examinations by doctors were performed in doctors' offices at 28 centers, in inspection rooms at 26 and both at 10, frequently as outpatient examinations in 51 centers (79.7%). The mean duration of examination was 9.8 min for the first examination of a symptomatic patient, 7.5 min for follow-up, 9.6 min for the first examination of an asymptomatic patient, and 7.6 min for follow-up. For non-doctors, the respective times were 16.7, 14.4, 14.7, and 14.2 min, respectively. Non-doctors performing examinations alone (87.9%) and with insufficient MG information (50.0%) took a longer time. Frequently, the image was read only by doctors (65.5%), employing static images (93.3%). Qualified specialist doctors and technologists accounted for 16.2%, and the rate of participation in training by the Japan Association of Breast and Thyroid Sonology (JABTS) was 24.7%. Based on the present questionnaire, conditions of breast ultrasonography for mild MG abnormalities still appear to be inadequate. (author)

  11. HVAC systems and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, S.T. (Linford Air and Refrigeration Company, Oakland, CA (US))

    1990-02-01

    The author discusses the section of the ASHRAE Standard 90.1-1989 which addresses HVAC systems and equipment. New features of HVAC systems mandatory general requirements are described. New prescriptive requirements are detailed.

  12. Optical system for UV-laser technological equipment

    Science.gov (United States)

    Fedosov, Yuri V.; Romanova, Galina E.; Afanasev, Maxim Ya.

    2017-09-01

    Recently there has been an intensive development of intelligent industrial equipment that is highly automated and can be rapidly adjusted for certain details. This equipment can be robotics systems, automatic wrappers and markers, CNC machines and 3D printers. The work equipment considered is the system for selective curing of photopolymers using a UV-laser and UV-radiation in such equipment that leads to additional technical difficulties. In many cases for transporting the radiation from the laser to the point processed, a multi-mirror system is used: however, such systems are usually difficult to adjust. Additionally, such multi-mirror systems are usually used as a part of the equipment for laser cutting of metals using high-power IR-lasers. For the UV-lasers, using many mirrors leads to crucial radiation losses because of many reflections. Therefore, during the development of the optical system for technological equipment using UV-laser we need to solve two main problems: to transfer the radiation for the working point with minimum losses and to include the system for controlling/handling the radiation spot position. We introduce a system for working with UV-lasers with 450mW of power and a wavelength of 0.45 μm based on a fiber system. In our modelling and design, we achieve spot sizes of about 300 μm, and the designed optical and mechanical systems (prototypes) were manufactured and assembled. In this paper, we present the layout of the technological unit, the results of the theoretical modelling of some parts of the system and some experimental results.

  13. Alternatives Generation Analysis Long Length Contaminated Equipment Removal System Storage

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Major pieces of Characterization sampling equipment are currently stored outdoors. This includes the Long Length Contaminated Equipment receiver trailer and transportation trailer. A decision is required to determine the preferred alternative for facilities to store and maintain this equipment. The Long Length Contaminated Equipment Removal System (LLCERS) consists of many tools, mechanisms, and controllers currently stored in various locations. Much of this equipment should be protected from the elements while being stored. Some of the LLCERS equipment should be protected with some kind of roof cover. This decision analysis is to determine the best alternative for weather protection for the large equipment requiring a cover. Additional details are included in Sections 2.0 and 5.0. Key assumptions used in this analysis are detailed in Section 3.2

  14. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  15. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  16. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  17. The introduction of compulsory compliance testing of medical diagnostic x-ray equipment in Western Australia

    International Nuclear Information System (INIS)

    Rafferty, M. W.; Jacob, C. S.

    1995-01-01

    Performance testing of medical diagnostic X-ray equipment can reveal equipment faults which, while not always clinically detectable, may contribute to reduced image quality and unnecessary radiation exposure of both patients and staff. Routine testing of such equipment is highly desirable to identify such faults and allows them to be rectified. The Radiological council of Western Australia is moving towards requiring compulsory compliance testing of all (new and existing) medical diagnostic X-ray equipment that all new mobile radiographic and new mammographic X-ray equipment be issued with a compliance test certificate as a prerequisite for registration. Workbooks which provide details of the tests required and recommended test methods have been prepared for medical radiographic (mobile and fixed), fluoroscopic and mammographic X-ray equipment. It is intended that future workbooks include details of the tests and methods for dental and computed tomography X-ray units. The workbooks are not limited to the compliance testing of items as specified in the Regulations, but include tests for other items such as film processing, darkrooms and image quality (for fluoroscopic equipment). Many of the workbook tests could be used within a regular quality assurance program for diagnostic X-ray equipment. Persons who conduct such compliance tests will need to be licensed and have all test certificates endorsed by a qualified expert. Suitable training and assessment of compliance testers will be required. Notification of such tests (including non-compliant items and corrective actions taken) will be required by the Radiological Council as a condition of equipment registration. 9 refs

  18. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  19. A timeline for predicting durable medical equipment needs and interventions for amyotrophic lateral sclerosis patients.

    Science.gov (United States)

    Bromberg, Mark B; Brownell, Alexander A; Forshew, Dallas A; Swenson, Michael

    2010-01-01

    ALS is progressive with increasing patient needs for durable medical equipment (DME) and interventions (gastric feeding tube - PEG, and non-invasive ventilation - NIV). We performed a chart review of deceased patients to determine the time-course of needs and their estimated costs. A timeline of needs was based on when clinic personnel felt an item was necessary. The point in time when an item or intervention was needed was expressed as a percentage of a patient's total disease duration. A wide range of DME and interventions was needed irrespective of site of ALS symptom onset (bulbar, upper, lower extremity), beginning at 10% of disease duration of lower extremity onset and increasing thereafter for all sites. The cumulative probability of costs of items and interventions began at 25%-50% of disease duration and increased to between $18,000 and $32,000 (USD), highest for lower extremity onset due to the cost of wheelchairs. We conclude that a high percentage of ALS patients will need a full spectrum of major DME items and interventions during the second half of disease duration. This results in a linear rise in costs over the second half of the disease duration.

  20. A Computerized Procedure linked to Virtual Equipment

    International Nuclear Information System (INIS)

    Jung, Yeon Sub; Song, Tae Young

    2011-01-01

    Digital, information, and communication technologies have change human's behavior. This is because human has limitation to memorize and process information. Human has to access other information and real time information for important decisions. Those technologies are playing important roles. Nuclear power plants cannot be exception. Many accidents in nuclear power plants result from absent or incorrect information. The information for nuclear personnel is context sensitive. They don't have enough time to verify the context sensitive information. Therefore they skip the information, as resulting in incident. Nuclear personnel are usually carrying static paper procedures during local task performance. The procedure guides them steps to follow. There is, however, no dynamic and context sensitive information in the paper. The effect of the work is evaluated once while getting permission of the work. Afterward they are not informed. The static paper is generally simplified, so that it does not show detail of equipment being manipulated. Particularly novice workers feel difficult to understand the procedure due to lack of detail. Pictures of equipment inserted in the procedure are not enough for comprehension. A computerized procedure linked with virtual equipment is one of the best solutions to increase the detail of procedure. Virtual equipment, however, has still limitation not to provide real time information, because the virtual equipment is not synchronized with real plants

  1. Quality system target on a detail design activity irradiator ISG 500

    International Nuclear Information System (INIS)

    Reinhard Pardede

    2010-01-01

    Currently, an engineering team of Nuclear Equipment Engineering Center PRPN has been beening technology innovation detail design of Irradiator ISG 500, then enter continuing to a construction phase. A schedule detail design still being not finish yet. The installation of Irradiator ISG 500 will be used to preservative the result of agricultural product in Indonesia. It is known as an export commodity and row material for food. However, its quality need some improvements in order to meet internal and foreign consumer standard. To enhance a quality system in detail design phase has already used ISO 9001: 2008 on clausul-7: Product Realization-design. It also needs a radioactive regulation Bapeten-Indonesian Nuclear Energy Surveillance Agency compliance with IAEA GS-R 3: 2006 as well. Scope of activity design is Instrumentation and Control system; Mechanical- Electrical; Radiation and Safety and Dosimetry; Civil Structured; Quality Assurance and Technoeconomic. Technology Innovating be applied to achieved economics through Costumer and Market Focused. Gamma irradiation of Irradiator ISG 500 can be used to improve hygienic quality in terms of technological as well as economical aspects. Technology innovation fit with the state of the arts right now. Assessment should be done base not only internal audit but also monitoring and surveillance as well. By application of a Quality System on detail design activity hopefully to enhance quality on detail design, construction, more over irradiator operation. (author)

  2. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  3. Annual report on the state of RB reactor components and equipment, december 1999

    International Nuclear Information System (INIS)

    Milosevic, M.

    1999-12-01

    According to the performed analysis, it is considered that the RB reactor can be operated safely until the existing control and safety systems could be maintained in satisfactory operable state. Failures of heavy water circulation system valves which may cause decreased availability but no accident. During 1998 the reactor lattice was changed 13 times, meaning that experiments were done with 13 configurations of the reactor core. Total reactor operation amounted to 84 Wh with 40 start-ups (attained criticality levels). This report contains 4 Annexes, detailed description of the state of reactor equipment in 1999, reactor operation nd utilization data, plan for regular annual maintenance and refurbishment of reactor equipment and plan for minimum needed resources for regular maintenance of the components and equipment in the forthcoming year

  4. Annual report on the state of RB reactor components and equipment, december 1998

    International Nuclear Information System (INIS)

    Milosevic, M.

    1998-12-01

    According to the performed analysis, it is considered that the RB reactor can be operated safely until the existing control and safety systems could be maintained in satisfactory operable state. Failures of heavy water circulation system valves which may cause decreased availability but no accident. During 1998 the reactor lattice was changed 7 times, meaning that experiments were done with 7 configurations of the reactor core. Total reactor operation amounted to 177.5 Wh with 40 start-ups (attained criticality levels). This report contains 4 Annexes, detailed description of the state of reactor equipment in 1998, reactor operation nd utilization data, plan for regular annual maintenance and refurbishment of reactor equipment and plan for minimum needed resources for regular maintenance of the components and equipment in the forthcoming year

  5. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  6. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  7. Radioactive contamination mapping system detailed design report

    International Nuclear Information System (INIS)

    Bauer, R.G.; O'Callaghan, P.B.

    1996-08-01

    The Hanford Site's 100 Area production reactors released radioactively and chemically contaminated liquids into the soil column. The primary source of the contaminated liquids was reactor coolant and various waste waters released from planned liquid discharges, as well as pipelines, pipe junctions, and retention basins leaking into the disposal sites. Site remediation involves excavating the contaminated soils using conventional earthmoving techniques and equipment, treating as appropriate, transporting the soils, and disposing the soils at ERDF. To support remediation excavation, disposal, and documentation requirements, an automated radiological monitoring system was deemed necessary. The RCMS (Radioactive Contamination Mapping System) was designed to fulfill this need. This Detailed Design Report provides design information for the RCMS in accordance with Bechtel Hanford, Inc. Engineering Design Project Instructions

  8. Information needs assessment of medical equipment offices based on Critical Success Factors (CSF) and Business System Planning (BSP) methods.

    Science.gov (United States)

    Khorrami, F; Ahmadi, M; Alizadeh, A; Roozbeh, N; Mohseni, S

    2015-01-01

    Introduction: Given the ever-increasing importance and value of information, providing the management with a reliable information system, which can facilitate decision-making regarding planning, organization and control, is vitally important. This study aimed to analyze and evaluate the information needs of medical equipment offices. Methods: This descriptive applied cross-sectional study was carried out in 2010. The population of the study included the managers of statistic and medical records at the offices of vice-chancellor for treatment in 39 medical universities in Iran. Data were collected by using structured questioners. With regard to different kinds of designing information systems, sampling was done by two methods, BSP (based on processes of job description) and CSF method (based on critical success factors). The data were analyzed by SPSS-16. Results: Our study showed that 41% of information needs were found to be critical success factors of managers of office. The first priority of managers was "the number of bed and bed occupancy in hospitals". Of 29 identified information needs, 62% were initial information needs of managers (from the viewpoints of managers). Of all, 4% of the information needs were obtained through the form, 14% through both the form and database, 11% through the web site, and 71% had no sources (forms, databases, web site). Conclusion: Since 71% of the information needs of medical equipment offices managers had no information sources, the development of information system in these offices seems to be necessary. Despite the important role of users in designing the information systems (identifying 62% of information needs), other scientific methods is also needed to be utilized in designing the information systems.

  9. Information needs assessment of medical equipment offices based on Critical Success Factors (CSF) and Business System Planning (BSP) methods

    Science.gov (United States)

    Khorrami, F; Ahmadi, M; Alizadeh, A; Roozbeh, N; Mohseni, S

    2015-01-01

    Introduction: Given the ever-increasing importance and value of information, providing the management with a reliable information system, which can facilitate decision-making regarding planning, organization and control, is vitally important. This study aimed to analyze and evaluate the information needs of medical equipment offices. Methods: This descriptive applied cross-sectional study was carried out in 2010. The population of the study included the managers of statistic and medical records at the offices of vice-chancellor for treatment in 39 medical universities in Iran. Data were collected by using structured questioners. With regard to different kinds of designing information systems, sampling was done by two methods, BSP (based on processes of job description) and CSF method (based on critical success factors). The data were analyzed by SPSS-16. Results: Our study showed that 41% of information needs were found to be critical success factors of managers of office. The first priority of managers was “the number of bed and bed occupancy in hospitals”. Of 29 identified information needs, 62% were initial information needs of managers (from the viewpoints of managers). Of all, 4% of the information needs were obtained through the form, 14% through both the form and database, 11% through the web site, and 71% had no sources (forms, databases, web site). Conclusion: Since 71% of the information needs of medical equipment offices managers had no information sources, the development of information system in these offices seems to be necessary. Despite the important role of users in designing the information systems (identifying 62% of information needs), other scientific methods is also needed to be utilized in designing the information systems. PMID:28255389

  10. Investigational research on welfare equipment needs/seeds adaptation; Fukushi kiki needs seeds tekigo chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    At the advent of the aging society, investigated are images of welfare equipment to be developed. In the range where the use of welfare equipment is to be studied, the following are included: self care, excretion, transfer, and support of work other than care, as assistance to daily life; exercise function, communication function, and environment arrangement, as assistance to social participation. Of the images of the welfare equipment classified by the overall evaluation, the following are cited as what supports daily life: a lift usable even in the existing houses, a bump remover by which bumps in the house are removed without making large repairs, a urine collector for females, a training device to prevent urinary incontinence, reduction in the bed-fast elderly, a device to prevent bedsore, a system for safely watching demented old people, a system in which clothes are automatically washed, dried, and hanged on a hanger, etc. What supports social participation are a system for sports experience by virtual reality, sound user interface, etc. For the aged to be healthy physically and mentally, it is essential to be taken good care of and create things to live for by participating the society. For this, it is necessary that the government establish the public policies and that a people be conscious of welfare. 9 figs., 33 tabs.

  11. Simulation Environment Synchronizing Real Equipment for Manufacturing Cell

    Science.gov (United States)

    Inukai, Toshihiro; Hibino, Hironori; Fukuda, Yoshiro

    Recently, manufacturing industries face various problems such as shorter product life cycle, more diversified customer needs. In this situation, it is very important to reduce lead-time of manufacturing system constructions. At the manufacturing system implementation stage, it is important to make and evaluate facility control programs for a manufacturing cell, such as ladder programs for programmable logical controllers (PLCs) rapidly. However, before the manufacturing systems are implemented, methods to evaluate the facility control programs for the equipment while mixing and synchronizing real equipment and virtual factory models on the computers have not been developed. This difficulty is caused by the complexity of the manufacturing system composed of a great variety of equipment, and stopped precise and rapid support of a manufacturing engineering process. In this paper, a manufacturing engineering environment (MEE) to support manufacturing engineering processes using simulation technologies is proposed. MEE consists of a manufacturing cell simulation environment (MCSE) and a distributed simulation environment (DSE). MCSE, which consists of a manufacturing cell simulator and a soft-wiring system, is emphatically proposed in detail. MCSE realizes making and evaluating facility control programs by using virtual factory models on computers before manufacturing systems are implemented.

  12. Irradiation position-control equipment for the HIMAC

    Energy Technology Data Exchange (ETDEWEB)

    Higashi, Seiichi; Kuma, Shoichiro [Mitsubishi Electric Corp., Tokyo (Japan); Nomura, Kazuaki; Endo, Masahiro; Minohara, Shin-ichi

    1995-02-01

    Use of heavy-ion beams to mount a pinpoint attack on unhealthy tissue requires that the target tissue be placed in the precise location specified by the therapy planning equipment. The article reports on the detailed specifications, positioning mechanism, position verification method and the interface with the therapy planning equipment. (author).

  13. Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2013-02-01

    The purpose of this report is to describe programs and tools for assessment of accomplished and documented qualification with respect to ageing of electrical equipment and for development of complimentary ageing management programs. In addition to description of complete programs for management of ageing, tools for validation of the status with regard to ageing of installed ('old') equipment and, where needed, for complementation of their qualification are also included. The report is restricted to safety related equipment containing ageing sensitive parts, mainly organic materials. To this category belong cables and cable joints and a number of equipment containing oils, seals (o-rings), etc. For equipment located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. The main part of this report deals with the qualification of such equipment. Some safety related equipment outside the containment can be located in areas where they are subjected to high temperature and other excessive environmental stresses during normal operation and in areas affected by an accident. Therefore, some material is given also on qualification of equipment located outside containment with better possibilities for frequent inspection and supervision. Part 1 of the report is an executive summary with a general review of the methodologies and their application. The more detailed description of the programs and underlying material, useful data, etc. is given in Part 2

  14. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  15. Equipment inspection function; A funcao inspecao de equipamentos

    Energy Technology Data Exchange (ETDEWEB)

    Bressan, Edemir [PETROBRAS (Brazil). Refinaria Alberto Pasqualini

    1994-04-01

    Development of the safety engineering and equipment inspection policy in petroleum industry, with emphasis to the refineries equipment, are discussed. Presentation of the accidents percentages in petroleum plants under international researches, with details of involved equipment, kind of accident, plant and causes are reported. The start and actual stage of the safety inspection program in the PETROBRAS are also presented 5 refs., 3 figs.

  16. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  17. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  18. Indoor pollutants emitted by office equipment: A review ofreported data and information needs

    Energy Technology Data Exchange (ETDEWEB)

    Destaillats, Hugo; Maddalena, Randy L.; Singer, Brett C.; Hodgson, Alfred T.; McKone, Thomas E.

    2007-02-01

    There is concern that potentially harmful pollutants may be emitted from office equipment. Although office equipment has been a focal point for governmental efforts to promote energy efficiency through programs such as the US EPA's Energy Star, little is known about the relationship between office equipment use and indoor air quality, and information on pollutant emissions is sparse. In this review, we summarize available information on emission rates and/or ambient concentrations of various pollutants that are related to office equipment use. Experimental methods used in the characterization of emissions are briefly described. The office equipment evaluated in this review includes computers (desktops and notebooks), printers (laser, ink-jet and all-in-one machines) and photocopy machines. Reported emission rates of the following pollutant groups are summarized: volatile organic chemicals (VOCs), ozone, particulate matter and several semivolatile organic chemicals (SVOCs). The latter include phthalate esters, brominated flame retardants, organophosphate flame retardants and polycyclic aromatic hydrocarbons (PAHs). We also review studies reporting airborne concentrations in indoor environments where office equipment was present and thought to be a significant contributor to the total pollutant burden (offices, residences, schools, electronics recycling plants). For certain pollutants, such as organophosphate flame retardants, the link between emission by office equipment and indoor air concentrations is relatively well established. However, indoor VOCs, ozone, PAHs and phthalate esters can originate from a variety of sources, and their source apportionment is less straightforward. This literature review identifies substances of toxicological significance, with the purpose of serving as a guide to evaluate their potential importance with respect to human exposures.

  19. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  20. Detailed Design of Cooling Water System for Cold Neutron Source in HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Bong Soo; Choi, Jung Woon; Kim, Y. K.; Wu, S. I.; Lee, Y. S

    2007-04-15

    To make cold neutron, a cryogenic refrigerator is necessary to transform moderator into cryogenic state so, thermal neutron is changed into cold neutron through heat transfer with moderator. A cryogenic refrigerator mainly consists of two apparatus, a helium compressor and a cold box which needs supply of cooling water. Therefore, cooling water system is essential to operate of cryogenic refrigerator normally. This report is mainly focused on the detailed design of the cooling water system for the HANARO cold neutron source, and describes design requirement, calculation, specification of equipment and water treatment method.

  1. Detailed Design of Cooling Water System for Cold Neutron Source in HANARO

    International Nuclear Information System (INIS)

    Kim, Bong Soo; Choi, Jung Woon; Kim, Y. K.; Wu, S. I.; Lee, Y. S.

    2007-04-01

    To make cold neutron, a cryogenic refrigerator is necessary to transform moderator into cryogenic state so, thermal neutron is changed into cold neutron through heat transfer with moderator. A cryogenic refrigerator mainly consists of two apparatus, a helium compressor and a cold box which needs supply of cooling water. Therefore, cooling water system is essential to operate of cryogenic refrigerator normally. This report is mainly focused on the detailed design of the cooling water system for the HANARO cold neutron source, and describes design requirement, calculation, specification of equipment and water treatment method

  2. Records Management Handbook; Source Data Automation Equipment Guide.

    Science.gov (United States)

    National Archives and Records Service (GSA), Washington, DC. Office of Records Management.

    A detailed guide to selecting appropriate source data automation equipment is presented. Source data automation equipment is used to prepare data for electronic data processing or computerized recordkeeping. The guide contains specifications, performance data cost, and pictures of the major types of machines used in source data automation.…

  3. Plasma Decontamination of Space Equipment for Planetary Protection

    Science.gov (United States)

    Thomas, Hubertus; Barczyk, Simon; Rettberg, Petra; Shimizu, Satoshi; Shimizu, Tetsuji; Klaempfl, Tobias; Morfill, Gregor; Zimmermann, Julia; Weber, Peter

    The search for extraterrestrial life is one of the most challenging science topics for the next decades. Space missions, like ExoMars, plan to land and search for biological remnants on planets and moons in our nearby Solar system. Planetary protection regulations defined by COSPAR prevent that during the mission biological contamination of the bodies occur through the space probes. Therefore decontamination of the probes and more general space equipment is necessary before the launch. The up-to-date accepted decontamination procedure originate from the old NASA Viking missions and use dry heat (T>110°C for 30h) - a technology not well suited for sensitive equipment nowadays. We investigated in a study financed by the German Space Agency* cold atmospheric plasma (CAP) as an alternative for such decontamination. It is well known that CAP can kill bacteria or spores within seconds or minutes, respectively, if the plasma is in direct contact with the treated sample. This procedure might also be quite aggressive to the treated surface materials. Therefore, we developed an afterglow CAP device specially designed for the soft treatment of space equipment. Afterglow plasma produced by a SMD device in air is transported into a “larger” treatment chamber where the samples are positioned. It could be shown that samples of different bacteria and spores, the latter defined by COSPAR as a means to show the effectiveness of the decontamination process, positioned on different materials (steel, Teflon, quartz) could be effectively inactivated. The surface materials were investigated after the plasma treatment to identify etching or deposition problems. The afterglow in the treatment chamber could even overcome obstacles (tubes of different height and diameter) which simulate more complicated structures of the relevant surfaces. Up to now, CAP looks like a quite promising alternative to decontaminate space equipment and need to be studied in greater detail in the near future

  4. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  5. The detail is dead - long live the detail!

    DEFF Research Database (Denmark)

    Larsen, Steen Nepper; Dalgaard, Kim; Kerstens, Vencent

    2018-01-01

    architecture when we look into architectural history. Too classic examples are; Adolf Loos who provoked already in 1908 with his statement; "Ornament and Crime", which contested the unconscious decorations of contemporary architects. Similarly, referring to the little need for superfluous detailing; "Less...... not change the fact that it is more important than ever to bring this 'small' architectural world to attention. Today, the construction industry is dictated by an economic management that does not leave much room for thorough studies of architectural details or visionary experiments. Today's more efficient......_Delft about the Symposium; "The Detail is Dead - Long Live the Detail". For this occasion a number of leading Danish and Northern European architects, researchers and companies were invited to discuss and suggest their 'architectural detail' and the challenges they face in today's construction. This book...

  6. Annual report on the state of RB reactor components and equipment, December 1997

    International Nuclear Information System (INIS)

    Milosevic, M.

    1997-12-01

    According to the performed analysis, it is considered that the RB reactor can be operated safely until the existing control and safety systems could be maintained in satisfactory operable state. Failures of heavy water circulation system valves which may cause decreased availability but no accident. During 1997 the reactor lattice was not changed due to application of the coupled fast-thermal core HERBE. Total reactor operation amounted to 69.5 Wh with 66 start-ups (attained criticality levels). This report contains 4 Annexes, detailed description of the state of reactor equipment, plan for forming new HERBE core, plan for regular annual maintenance of the reactor, and plan for minimum needed resources for regular maintenance of the components and equipment in the forthcoming year

  7. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  8. Training simulator for advanced gas-cooled reactor (AGR) shutdown sequence equipment

    International Nuclear Information System (INIS)

    Shankland, J.P.; Nixon, G.L.

    1978-01-01

    Successful shutdown of nuclear plant is of prime importance for both safety and economic reasons and large sums of money are spent on equipment to make shutdowns fully automatic, thus removing the possibility of operator errors. While this aim can largely be realized, one must consider the possibility of automatic equipment or plant failures when operators are required to take manual action, and off-line training facilities should be available to operating staff to minimize the risk of incorrect actions being taken. This paper presents the practice adopted at Hunterston 'B' Nuclear Power Station to solve this problem and concerns the computer-based training simulator for the Reactor Shutdown Sequence Equipment (RSSE) which was commissioned in January 1977. The plant associated with shutdown is briefly described and the reasoning which shows the need for a simulator is outlined. The paper also gives details of the comprehensive facilities available on the simulator and goes on to describe the form that shutdown training takes and the experience gained at this time. (author)

  9. New equipment for the needs of mobile automatic ultrasonic testing

    International Nuclear Information System (INIS)

    Cost, H.; Vogt, M.

    1989-01-01

    A newly designed system of equipment - ECHOGRAPH 1030 MULTI - for multiplex operation is introduced. The frequency control unit which can distribute a pulse sequency frequency from a maximum of 8 KHz to up to 8 cycles and the monitor evaluation, are described. (MM) [de

  10. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  11. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  12. 46 CFR 160.013-3 - Materials, workmanship, and construction details.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, and construction details. 160.013-3 Section 160.013-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT... materials, workmanship, and construction details shall be in substantial compliance with the provisions of...

  13. Mobile contract services: what you need to know.

    Science.gov (United States)

    Inman, M

    2000-01-01

    With sufficient planning and ongoing attention to detail, the performance of a mobile imaging service provider can exceed expectations and requirements. The relationship can prove to be mutually agreeable and profitable for many years. But, when contracting mobile services, you cannot spend too much time on initial research and detail. Several scenarios present outsourcing or mobile services as an acceptable alternative to purchase or lease: outdated equipment, novel or under-utilized technologies, the need for incrementally added or temporary service. To find suitable providers, check with peer sources in your area for recommendations; look specifically for facilities that are comparable in size and volume to your facility. Expect that larger volume facilities will rate more favorable schedules or pricing. Obtain and check references. Require mobile service providers to adhere to the same state and federal laws, rules and regulations that govern your facility; receive the assurance of compliance in writing if it is not specifically addressed in the contract. JCAHO requires that any contract service provider be governed by the same requirements as the accredited facility. Several other rules or licensing requirements may also pertain to mobile services. A prevailing reason for outsourcing imaging services is high equipment costs that cannot be justified with current volume projections. However, equipment quality should not be compromised; it must meet your needs and be in good repair. The mobile service provider you choose should be an extension of your department; quality standards must exist unilaterally. The set rule for assessing mobile service fees is that there is no set rule. There are many ways to negotiate the fee schedule so that it meets the needs of both parties. An effective marketing campaign lets physicians and patients know what you have available. Work with the mobile service provider to plan an initial announcement or open house. The mobile

  14. Guideline on dependability management for the power industry: detailed description of international power plant equipment dependability indicators

    International Nuclear Information System (INIS)

    Procaccia, H.; Silberberg, S.

    1997-01-01

    Dependability Management involves the management of reliability, availability maintainability and maintenance support, and in the power industry is necessary to ensure that plant meets the Reliability, Availability and Maintainability (RAM) targets set by the Utilities. In 1993, a joint Standard on Dependability Programme Management - Part 1: Dependability Programme Management), ISO 9000-': 1993 (Quality Management and Quality Assurance Standards - Part 4: Guide to Dependability Programme Management). UNIPEDE established a group of experts (Nulethermaint) to produce guidelines on its implementation specifically for use in the power industry. The present document comprises Part 2 OF THE UNIPEDE plant performance indicators and can be applied to both nuclear and fossil plant. There are five different equipment dependability indicators, all relating to equipment maintenance activities and the impact that these activities have on the loss of both system function and unit capability. Per year, each of the indicators can be applied separately to both preventive maintenance and corrective maintenance, giving rise to as many as ten indicator values for each item of equipment. Used in this way, the indicators provide a comprehensive picture of the maintenance strategy employed for key pieces of equipment, and its effectiveness. They are, therefore, a valuable managerial tool for improving maintenance activities at the unit level within a utility. This document provides guidance on the division of both nuclear and fossil power plant into their component parts and in each case the types of equipment having the most dominant effect on dependability are identified. These are the items which merit the greatest attention with regard to the equipment dependability indicators. (authors)

  15. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  16. Respiratory and protective equipment at a large nuclear facility

    International Nuclear Information System (INIS)

    Zippler, D.B.

    1975-12-01

    A variety of personal protective equipment is used in a large nuclear facility to protect employees against both nuclear and ordinary industrial materials. Equipment requirements are based on risk evaluation and may range from a minimum of shoe covers to whole body protection by air-supplied plastic suits. Types of equipment are listed and one-year costs are given. Criteria for evaluating and compartmentalizing risks are discussed. Air-supplied suits and hoods are discussed in detail

  17. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  18. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  19. Interventional suite and equipment management: cradle to grave

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, Keith J. [Harvard Medical School, Radiology Physics and Engineering, Children' s Hospital Boston, Boston, MA (United States)

    2006-09-15

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  20. Interventional suite and equipment management: cradle to grave

    International Nuclear Information System (INIS)

    Strauss, Keith J.

    2006-01-01

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  1. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  2. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  3. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  4. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  5. Reconciliation of equipment flexibility effects on piping system dynamic response

    International Nuclear Information System (INIS)

    Geraets, L.H.

    1987-01-01

    Piping systems are connected to equipment; if the equipment cannot be considered as ''rigid'' relative to excitation frequencies, nozzle response spectra techniques, or equipment modeling techniques are used. If the equipment is considered rigid, a fixed anchor is assumed. However, occasionally after (seismic) dynamic analysis has been completed, tests or detailed equipment dynamic analyses demonstrate that the assumption of ''infinite stiff'' is questionable. This paper reviews several classes of equipment (pumps, vessels, reservoirs, heat exchangers), and the associated (piping stresses, support loads, equipment nozzle allowables). Significant divergences between design and ''as built'' results are shown (for heat exchangers in particular). The paper discusses the reconciliation process performed for a belgian PWR plant through the use of less conservative seismic damping data (Code Case N-411)

  6. Code of practice for the safe use of industrial radiography equipment (1989)

    International Nuclear Information System (INIS)

    1989-12-01

    This code supersedes the Code of practice for the control and safe handling of sealed radioactive sources used in industrial radiography, published by the National Health and Medical Research Council (NHMRC) in 1968. It differs significantly from the former code because radiation protection practice and recommended standards have changed. The code covers the design, construction and requirements for the safe use of X-radiography equipment and gamma-radiography equipment. It provides illustrative working rules, detailed emergency procedures and comprehensive responsibilities and duties for all personnel involved in supplying and using industrial radiography equipment. The code details those equipment requirements, personnel requirements and work practices that the NHMRC considers necessary to keep exposures to ionizing radiation as low as reasonably achievable. Some equipment and facilities currently in use may not meet all of the mandatory requirements of this code. These requirements have been included in the code to encourage progress towards future compliance in the expectation that, in the interim, statutory authorities will apply them with discretion

  7. 24 CFR 965.306 - Energy conservation equipment and practices.

    Science.gov (United States)

    2010-04-01

    ... Measures § 965.306 Energy conservation equipment and practices. In purchasing original or, when needed, replacement equipment, PHAs shall acquire only equipment that meets or exceeds the minimum efficiency... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Energy conservation equipment and...

  8. Composition and fundamental requirements of nuclear emergency response monitoring equipment

    International Nuclear Information System (INIS)

    Lai Yongfang; Huang Weiqi; Wang Yonghong

    2009-01-01

    Nuclear emergency monitoring equipment is concrete foundation for accomplishing radiation monitoring in nuclear or radiation accidents. Based on technical report: Generic procedures for monitoring in a nuclear or radiological emergency published by IAEA in 1999, this paper presents the main task and composition of nuclear emergency monitoring briefly, and then the basic equipment and trends of nuclear emergency monitoring equipment is put forward in detail, which is useful to construction and reinforcement of our nuclear emergency monitoring. (authors)

  9. Apollo experience report: Development flight instrumentation. [telemetry equipment for space flight test program

    Science.gov (United States)

    Farmer, N. B.

    1974-01-01

    Development flight instrumentation was delivered for 25 Apollo vehicles as Government-furnished equipment. The problems and philosophies of an activity that was concerned with supplying telemetry equipment to a space-flight test program are discussed. Equipment delivery dates, system-design details, and flight-performance information for each mission also are included.

  10. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  11. Exploring the Managerial Dilemmas Encountered by Advanced Analytical Equipment Providers in Developing Service-led Growth Strategies

    DEFF Research Database (Denmark)

    Raja, Jawwad; Frandsen, Thomas; Mouritsen, Jan

    2017-01-01

    This paper examines the dilemmas encountered by manufacturers of advanced analytical equipment in developing service-led growth strategies to expand their business in pursuit of more attractive revenue models. It does so by adopting a case-based research approach. The findings detail the challenges...... faced in providing advanced services to customers’ R & D functions, while simultaneously attempting to scale up these services for a production context. The emergent complexities of operating in multiple arenas in order to explore and exploit technologies in different contexts—along the three...... trajectories of serviceability, scalability and solutions—with a view to expanding markets and developing solution-based business models, are discussed. It is argued that manufacturers of analytical equipment encounter certain dilemmas, as managing the different trajectories involves different needs...

  12. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Tabor, M.A.

    1988-01-01

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  13. Potentially damaging failure modes of high- and medium-voltage electrical equipment

    International Nuclear Information System (INIS)

    Hoy, H.C.

    1983-07-01

    The electrical equipment failures of both nuclear and nonnuclear public utilities were reviewed. Those failures that could pose an additional problem to surrounding and connected equipment were defined. The literature was searched; utilities, repair shops, and large electrical equipment users were contacted for failure information. The data were reviewed in detail, and failure modes were determined. Sample cascade failures are discussed. The failure rate of electrical equipment in utilities is historically quite low. Nuclear plants record too few failures to be statistically valid, but failures that have been recorded show that good design usually restricts the failure to a single piece of equipment

  14. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  15. Satisfying the needs of Japanese cancer patients: a comparative study of detailed and standard informed consent documents.

    Science.gov (United States)

    Sato, Keiko; Watanabe, Toru; Katsumata, Noriyuki; Sato, Tosiya; Ohashi, Yasuo

    2014-02-01

    Simplified informed consent forms have been successful in improving patient satisfaction and decreasing patient anxiety. However, unsolved problems remain about whether these documents improve comprehension and satisfaction of patients with standard literacy skills. s To investigate whether a detailed consent form explaining the key elements of informed consent, in comparison to a standard consent form, would increase the comprehension and satisfaction of adult cancer patients. Patients who were eligible for the National Surgical Adjuvant Study of Breast Cancer (protocol 01(N-SAS/BC-01)) were randomly selected to receive one of the following four versions: detailed document with graphics, detailed document without graphics, standard document with graphics, and standard document without graphics. The forms were written in plain language from the patients' point of view. A total of 85 patients were administered questionnaires via interview to assess levels of comprehension, satisfaction, and anxiety. Patients demonstrated a strong understanding of information regarding treatment and research. Patient comprehension did not differ significantly between the detailed document arms and the standard document arms. Patient satisfaction level increased according to the amount of information presented in the consent form; most patients preferred the detailed document with graphics. Anxiety and accrual rates in the parent study were not affected by informed consent procedures. Findings were limited to adults who had standard literacy skills and may not be generalizable to a population with lower literacy. Informed consent can be a significant experience for a population with standard literacy skills, as long as the document is easily comprehensible. Such information should be provided in a format that corresponds with patient needs, education levels, and preferences.

  16. Fire prevention and protection for trackless equipment

    Energy Technology Data Exchange (ETDEWEB)

    Burger, A.J.

    1988-10-01

    With the increased use of trackless diesel and electrical equipment underground, the fire danger associated with this equipment has increased. The need for adequate fire prevention and protection on all aspects of trackless mechanised mining must be taken into consideration. This paper describes briefly the causes of fires on trackless equipment and the precautions taken to reduce the risk of ignition. 1 tab.

  17. Strategies for replacement of obsolete equipment - including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2000-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of: commercially available equivalent component; modification of a commercial available component; reverse engineering of the original component; and finally, design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: Missing, misleading or no information on the original component; Acquiring information from the original equipment manufacturer and the plant; Using a sample component for the replacement evaluation and or reverse engineering; and Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  18. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  19. Computer imaging of EBR-II fuel handling equipment

    International Nuclear Information System (INIS)

    Peters, G.G.; Hansen, L.H.

    1995-01-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. The system described in this paper uses actual signals to drive a three-dimensional computer-generated model in real-time in response to movements of equipment in the plant This paper will present details on how the 3D model of the intank equipment was created and how real-time dynamic behavior was added to each of the moving components

  20. Computer imaging of EBR-II handling equipment

    International Nuclear Information System (INIS)

    Hansen, L.H.; Peters, G.G.

    1994-10-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. The system described in this paper uses actual signals to move a three-dimensional graphics model in real-time in response to movements of equipment in the plant. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. This paper will present details on how the 3D model was created and how real-time dynamic behavior was added to each of the moving components

  1. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  2. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1990-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  3. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1987-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  4. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Sanovic, V.

    1988-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  5. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Tanaskovic, M.

    1995-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  6. Code of practice for the safe use of industrial radiography equipment (1989)

    International Nuclear Information System (INIS)

    1989-12-01

    This code supersedes the Code of Practice for the control and safe handling of sealed radioactive sources use din industrial radiography, published by the National Health and Medical Research Council (NHMRC) in 1968. It differs significantly from the former code because radiation protection practice and recommended standards have changed. The code covers the design, construction and requirements for the safe use of X-radiography equipment and gamma-radiography equipment. It provides illustrative working rules, detailed emergency procedures and comprehensive responsibilities and duties for all personnel involved in supplying and using industrial radiography equipment. The code details those equipment requirements, personnel requirements and work practices that the NHMRC considers necessary to keep exposures to ionizing radiation as low as reasonably achievable. Some equipment and facilities currently in use may not meet all of the mandatory requirements of this code. These requirements have been included in the code to encourage progress towards future compliance in the expectation that, in the interim, statutory authorities will apply them with discretion. 9 refs., tabs., ills

  7. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  8. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  9. On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN

    CERN Document Server

    Rausch, R

    1999-01-01

    The future Large Hadron Collider to be built at CERN will use superconducting magnets cooled down to 1.2 K. To preserve the superconductivity, the energy deposition dose levels in equipment located outside the cryostat, in the LHC tunnel, are calculated to be of the order of 1 to 10 Gy per year. At such dose levels, no major radiation-damage problems are to be expected, and the possibility of installing Commercial Of The Shelf (COTS) electronic equipment in the LHC tunnel along the accelerator is considered. To this purpose, industrial electronic equipment and circuits have to be qualified and tested against radiation to insure their long term stability and reliability. An on-line radiation test facility has been setup at the CERN Super Proton Synchrotron (SPS) and a program of on-line tests for electronic equipment is ongoing. Equipment tested includes Industrial Programmable Logic Controllers (PLCs) from several manufacturers, standard VME modules, Fieldbuses like Profibus, WorldFIP and CAN, various electro...

  10. Chemical decontamination solutions: Effects on PWR equipment

    International Nuclear Information System (INIS)

    Pezze, C.M.; Colvin, E.R.; Aspden, R.G.

    1992-01-01

    A critical objective for the nuclear industry is the reduction of personnel exposure to radiation. Reductions have been achieved through industry's radiation management programs including training and radiation awareness concepts. Increased plant maintenance and higher radiation fields at many sites continue to raise concerns. To alleviate the radiation exposure problem, the sources of radiation which contribute to personnel exposure must be removed from the plant. A feasible was of significantly reducing these sources from a Pressurized Water Reactor (PWR) is to chemically decontaminate the entire reactor coolant system (RCS). A program was conducted to determine the technical acceptability of using certain dilute chemical solvent processes for full RCS chemical decontamination. The two processes evaluated were CAN-DEREM and LOMI. The purpose of the program was to define and complete a systematic evaluation of the major issues that need to be addressed for the successful decontamination of the entire RCS and affected portions of the auxiliary systems of a four-loop PWR system. A test program was designed to evaluate the corrosion effects of the two decontamination processes under expected plant conditions. Materials and sample configurations dictated by generic PWR components were evaluated. The testing also included many standard corrosion coupons. The test data were then used to assess the impact of chemical decontamination on the physical condition and operability of the components, equipment and mechanical systems that make up the RCS. An overview of the test program, sample configurations, data and engineering evaluations is presented. The data demonstrate that through detailed engineering evaluations of corrosion data and equipment function, the impact of full RCS chemical decontamination on plant equipment is established

  11. Guidance for the licensing procedure concerning the application of radiographic equipment

    International Nuclear Information System (INIS)

    1987-01-01

    According to article 4 of the Ordinance on the Implementation of Atomic Safety and Radiation Protection dated 11 October 1984 the operation of radiographic equipment has to be licensed. The personnel and material requirements that are to be fulfilled by a licensee prior to commissioning X-ray or gamma equipment, are discussed in detail

  12. Strategies for replacement of obsolete equipment, including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of, (1) commercially available equivalent component, (2) modification of a commercial available component, (3) reverse engineering of the original component and finally (4) design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: 1) Missing, misleading or no information on the original component. 2) Acquiring information from the original equipment manufacturer and the plant. 3) Using a sample component for the replacement evaluation and or reverse engineering. 4) Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  13. Timing criteria for supplemental BWR emergency response equipment

    International Nuclear Information System (INIS)

    Bickel, John H.

    2015-01-01

    The Great Tohuku Earthquake and subsequent Tsunami represented a double failure event which destroyed offsite power connections to Fukushima-Daiichi site and then destroyed on-site electrical systems needed to run decay heat removal systems. The accident could have been mitigated had there been supplemental portable battery chargers, supplemental pumps, and in-place piping connections to provide alternate decay heat removal. In response to this event in the USA, two national response centers, one in Memphis, Tennessee, and another in Phoenix, Arizona, will begin operation. They will be able to dispatch supplemental emergency response equipment to any nuclear plant in the U.S. within 24 hours. In order to define requirements for supplemental nuclear power plant emergency response equipment maintained onsite vs. in a regional support center it is necessary to confirm: (a) the earliest time such equipment might be needed depending on the specific scenario, (b) the nominal time to move the equipment from a storage location either on-site or within the region of a nuclear power plant, and (c) the time required to connect in the supplemental equipment to use it. This paper describes an evaluation process for a BWR-4 with a Mark I Containment starting with: (a) severe accident simulation to define best estimate times available for recovery based on the specific scenario, (b) identify the key supplemental response equipment needed at specific times to accomplish recovery of key safety functions, and (c) evaluate what types of equipment should be warehoused on-site vs. in regional response centers. (authors)

  14. Space station communications and tracking equipment management/control system

    Science.gov (United States)

    Kapell, M. H.; Seyl, J. W.

    1982-01-01

    Design details of a communications and tracking (C and T) local area network and the distribution system requirements for the prospective space station are described. The hardware will be constructed of LRUs, including those for baseband, RF, and antenna subsystems. It is noted that the C and T equipment must be routed throughout the station to accommodate growth of the station. Configurations of the C and T modules will therefore be dependent on the function of the space station module where they are located. A block diagram is provided of a sample C and T hardware distribution configuration. A topology and protocol will be needed to accommodate new terminals, wide bandwidths, bidirectional message transmission, and distributed functioning. Consideration will be given to collisions occurring in the data transmission channels.

  15. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  16. Development and Performance Evaluation of Image-Based Robotic Waxing System for Detailing Automobiles.

    Science.gov (United States)

    Lin, Chi-Ying; Hsu, Bing-Cheng

    2018-05-14

    Waxing is an important aspect of automobile detailing, aimed at protecting the finish of the car and preventing rust. At present, this delicate work is conducted manually due to the need for iterative adjustments to achieve acceptable quality. This paper presents a robotic waxing system in which surface images are used to evaluate the quality of the finish. An RGB-D camera is used to build a point cloud that details the sheet metal components to enable path planning for a robot manipulator. The robot is equipped with a multi-axis force sensor to measure and control the forces involved in the application and buffing of wax. Images of sheet metal components that were waxed by experienced car detailers were analyzed using image processing algorithms. A Gaussian distribution function and its parameterized values were obtained from the images for use as a performance criterion in evaluating the quality of surfaces prepared by the robotic waxing system. Waxing force and dwell time were optimized using a mathematical model based on the image-based criterion used to measure waxing performance. Experimental results demonstrate the feasibility of the proposed robotic waxing system and image-based performance evaluation scheme.

  17. 1E Qualification of Electrical Equipment - Requirement for Safety Nuclear Power Plants

    International Nuclear Information System (INIS)

    Geambasu, C.; Segarceanu, D.; Albu, J.

    2002-01-01

    The paper presents the qualification methods of the safety related equipment according to the safety class 1E. There are presented the qualification principles, procedure and documents, emphasis being laid on the qualification approach by type tests. This approach assumes the equipment test under both normal and accident conditions (design basis events) simulating the operational conditions and covers the largest part of electrical equipment from a nuclear power plant.The safety related equipment is to be qualified is subjected to a sequential test that will be detailed in the paper. (author)

  18. Framed bit error rate testing for 100G ethernet equipment

    DEFF Research Database (Denmark)

    Rasmussen, Anders; Ruepp, Sarah Renée; Berger, Michael Stübert

    2010-01-01

    rate. As the need for 100 Gigabit Ethernet equipment rises, so does the need for equipment, which can properly test these systems during development, deployment and use. This paper presents early results from a work-in-progress academia-industry collaboration project and elaborates on the challenges...

  19. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Karic, Z.

    2002-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. Activity plan for year 2002 is included [sr

  20. Evaluation formulas of manpower needs for dismantling of equipment in FUGEN-3. Dismantling process of the condenser removal

    International Nuclear Information System (INIS)

    Kubota, Shintaro; Izumo, Sari; Usui, Hideo; Kawagoshi, Hiroshi; Koda, Yuya; Nanko, Takashi

    2014-07-01

    Japan Atomic Energy Agency (JAEA) has been developing the PRODIA code which supports to make decommissioning plan and has been preparing evaluation formulas. Manpower needs for the dismantling of the condenser that had conducted from 2010 to 2012 was analyzed and compared with existing evaluation formulas. Applicability of evaluation formulas for a large scale reactor facility was confirmed in dismantling of the heat insulating materials and reliability of unit productivity factor was improved. The evaluation formula of work for clearance was made in dismantling of pipes and supports. Unit productivity factor of dismantling of feed water heaters which is applicable for a large scale reactor facility was derived. For derivation of unit productivity factor, statistically meaningful data was provided from the dismantling of the condenser. Manpower needs for dismantling of the condenser has positive correlation to the weight of equipment and can be described in linear expression. Reliability of each unit productivity factor will be improved with accumulating actual dismantling data in future. (author)

  1. Experimental Equipment for Physics Studies in the Aagesta Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Bernander, G; Blomberg, P E; Dubois, P O

    1967-03-15

    Comprehensive physics measurements were carried out in connection with the start up of the Agesta reactor. For this purpose special experimental equipment was constructed and installed in the reactor. Parts of this were indispensable and/or time-saving for the reactivity control during the core build-up period and during the first criticality studies. This report gives mainly a detailed description of the experimental equipment used, but also the relevant physics background and the experience gained during the performance.

  2. Fluorolon coatings of cold drying for radiation-protective equipment

    International Nuclear Information System (INIS)

    Shigorina, I.I.; Egorov, B.N.; Timofeeva, L.P.

    1977-01-01

    A composition of the volatile fraction (butyl acetate:acetone = 3:1) is proposed for fluorolon 32L base varnishes possessing high viability. Formulations for the fluorolon air-drying enamels of various colous are presented. Fluorolon coatings based on these enamels are detailed, providing satisfactory adhesion properties. A fairly high chemical stability of these coatings is shown making it possible to employ them for anti-corrosion protection of outer surfaces, equipment and building constructions for chemical equipment

  3. Staff report on the environmental qualification of safety-related electrical equipment

    International Nuclear Information System (INIS)

    1977-12-01

    The current NRC safety review process for nuclear power plants includes criteria related to the qualification of certain electrical equipment. These criteria require that electrical equipment important to safety must be qualified to function in the environment that might result from various accident conditions. Although such criteria have been applied since the early days of commercial nuclear power, the details of these criteria have been changed over the years. The evolution of environmental qualification of safety-related electrical equipment is described in Appendix A

  4. Integration of transport and handling equipment at CERN criteria to satisfy operational needs and safety aspects

    CERN Document Server

    Bertone, C; CERN. Geneva. TS Department

    2004-01-01

    Within the last 4 years TS-IC-HM (former ST-HM group) integrated about 150 transport and handling supplies including 29 cranes, 20 fork lift trucks, 60 tunnel vehicles. Most of these are standardised supplies, but very often special functionality has been implemented and the complexity of the equipment has been increased. With the Rocla cryo-dipol transporters even prototype equipment was integrated that had been specially designed for CERN. This paper discusses the differences regarding the actions that have to be performed when the different kind of equipment have to be integrated.

  5. Equipment Management for Sensor Networks: Linking Physical Infrastructure and Actions to Observational Data

    Science.gov (United States)

    Jones, A. S.; Horsburgh, J. S.; Matos, M.; Caraballo, J.

    2015-12-01

    Networks conducting long term monitoring using in situ sensors need the functionality to track physical equipment as well as deployments, calibrations, and other actions related to site and equipment maintenance. The observational data being generated by sensors are enhanced if direct linkages to equipment details and actions can be made. This type of information is typically recorded in field notebooks or in static files, which are rarely linked to observations in a way that could be used to interpret results. However, the record of field activities is often relevant to analysis or post-processing of the observational data. We have developed an underlying database schema and deployed a web interface for recording and retrieving information on physical infrastructure and related actions for observational networks. The database schema for equipment was designed as an extension to the Observations Data Model 2 (ODM2), a community-developed information model for spatially discrete, feature based earth observations. The core entities of ODM2 describe location, observed variable, and timing of observations, and the equipment extension contains entities to provide additional metadata specific to the inventory of physical infrastructure and associated actions. The schema is implemented in a relational database system for storage and management with an associated web interface. We designed the web-based tools for technicians to enter and query information on the physical equipment and actions such as site visits, equipment deployments, maintenance, and calibrations. These tools were implemented for the iUTAH (innovative Urban Transitions and Aridregion Hydrosustainability) ecohydrologic observatory, and we anticipate that they will be useful for similar large-scale monitoring networks desiring to link observing infrastructure to observational data to increase the quality of sensor-based data products.

  6. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  7. FY 2000 Report on survey/analysis of needs. Survey on systems for developing welfare-related equipment in overseas countries; 2000 nendo needs chosa bunseki hokokusho. Kaigai ni okeru fukushi kiki kaihatsu seido chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The systems in American and European countries for technological development of welfare-related equipment and tools are surveyed and analyzed, with the objectives to draw proposals for establishing the systems which help smooth spread of the research/development results. It is necessary, in selecting the research themes, to well balance the supports for research and development based on the ideas and initiatives by the researchers with those for the publicly invited themes in which the government narrows down the politically important items. For exchanging researchers, the program should help exchange researchers routinely, to match the needs and seeds. It is necessary for the research and development programs promoted by the government for welfare-related equipment to quantitatively grasp the characteristics of various body functions and deterioration of these functions by aging, and to encourage the new participants by providing them with the databases. For promotion of spreading the R and D results, it is necessary to develop laws and regulations which help reduce expenses of the individual disabled and aged, and promote purchase of equipment through insurance, like ADA and rehabilitation-related laws adopted by USA. (NEDO)

  8. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  9. Cost analysis for heavy equipment in earthfill work - An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

    Science.gov (United States)

    Arifin, Muhammad Faizal Ardhiansyah

    2017-03-01

    Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.

  10. Radiotherapy equipment and departments in the European countries

    DEFF Research Database (Denmark)

    Grau, Cai; Defourny, Noémie; Malicki, Julian

    2014-01-01

    BACKGROUND: Documenting the distribution of radiotherapy departments and the availability of radiotherapy equipment in the European countries is an important part of HERO - the ESTRO Health Economics in Radiation Oncology project. HERO has the overall aim to develop a knowledge base...... of the provision of radiotherapy in Europe and build a model for health economic evaluation of radiation treatments at the European level. The aim of the current report is to describe the distribution of radiotherapy equipment in European countries. METHODS: An 84-item questionnaire was sent out to European...... countries, principally through their national societies. The current report includes a detailed analysis of radiotherapy departments and equipment (questionnaire items 26-29), analyzed in relation to the annual number of treatment courses and the socio-economic status of the countries. The analysis is based...

  11. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  12. Automated space processing payloads study. Volume 3: Equipment development resource requirements. [instrument packages and the space shuttles

    Science.gov (United States)

    1975-01-01

    Facilities are described on which detailed preliminary design was undertaken and which may be used on early space shuttle missions in the 1979-1982 time-frame. The major hardware components making up each facility are identified, and development schedules for the major hardware items and the payload buildup are included. Cost data for the facilities, and the assumptions and ground rules supporting these data are given along with a recommended listing of supporting research and technology needed to ensure confidence in the ability to achieve successful development of the equipment and technology.

  13. Nanoparticle exposures from nano-enabled toner-based printing equipment and human health: state of science and future research needs.

    Science.gov (United States)

    Pirela, Sandra Vanessa; Martin, John; Bello, Dhimiter; Demokritou, Philip

    2017-09-01

    Toner formulations used by laser printers (LP) and photocopiers (PC), collectively called "toner-based printing equipment" (TPE), are nano-enabled products (NEP) because they contain several engineered nanomaterials (ENM) that improve toner performance. It has been shown that during consumer use (printing), these ENM are released in the air, together with other semi-volatile organic nanoparticles, and newly formed gaseous co-pollutants such as volatile organic compounds (VOC). The aim of this review is to detail and analyze physico-chemical and morphological (PCM), as well as the toxicological properties of particulate matter (PM) emissions from TPE. The review covers evolution of science since the early 2000, when this printing technology first became a subject of public interest, as well as the lagging regulatory framework around it. Important studies that have significantly changed our understanding of these exposures are also highlighted. The review continues with a critical appraisal of the most up-to-date cellular, animal and human toxicological evidence on the potential adverse human health effects of PM emitted from TPE. We highlight several limitations of existing studies, including (i) use of high and often unrealistic doses in vitro or in vivo; (ii) unrealistically high-dose rates in intratracheal instillation studies; (iii) improper use of toners as surrogate for emitted nanoparticles; (iv) lack of or inadequate PCM characterization of exposures; and (v) lack of dosimetry considerations in in vitro studies. Presently, there is compelling evidence that the PM 0.1 from TPE are biologically active and capable of inducing oxidative stress in vitro and in vivo, respiratory tract inflammation in vivo (in rats) and in humans, several endpoints of cellular injury in monocultures and co-cultures, including moderate epigenetic modifications in vitro. In humans, limited epidemiological studies report typically 2-3 times higher prevalence of chronic cough, wheezing

  14. Method and procedure of fatigue analysis for nuclear equipment

    International Nuclear Information System (INIS)

    Wen Jing; Fang Yonggang; Lu Yan; Zhang Yue; Sun Zaozhan; Zou Mingzhong

    2014-01-01

    As an example, the fatigue analysis for the upper head of the pressurizer in one NPP was carried out by using ANSYS, a finite element method analysis software. According to RCC-M code, only two kinds of typical transients of temperature and pressure were considered in the fatigue analysis. Meanwhile, the influence of earthquake was taken into account. The method and procedure of fatigue analysis for nuclear safety equipment were described in detail. This paper provides a reference for fatigue analysis and assessment of nuclear safety grade equipment and pipe. (authors)

  15. Test and Analysis of Metallurgical Converter Equipment

    Directory of Open Access Journals (Sweden)

    Shan Pang

    2013-05-01

    Full Text Available Oxygen top-blow converter is the main equipment in steel making, and its work reliability decides the security and economy of steel production. Therefore, how to design and test analysis of convertor has been an important subject of industry research. Geometric modelling and structure analysis of converter tilting device by using Pro/E program .The design Principle, basic design structure were analyzed in detail. The computer simulation software of metallurgical converter equipment and how to use it were introduced .It developed by VC++ software. The position of barycentre and moment curve in No.3 and No.4 are calculated. The converter acceleration down dip can be resolved by comparing the moment curve and center curve.

  16. Cryogenic equipment

    International Nuclear Information System (INIS)

    Leger, L.; Javellaud, J.; Caro, C.; Gilguy, R.; Testard, O.

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [fr

  17. Recovery Act: Training Program Development for Commercial Building Equipment Technicians

    Energy Technology Data Exchange (ETDEWEB)

    Leah Glameyer

    2012-07-12

    The overall goal of this project has been to develop curricula, certification requirements, and accreditation standards for training on energy efficient practices and technologies for commercial building technicians. These training products will advance industry expertise towards net-zero energy commercial building goals and will result in a substantial reduction in energy use. The ultimate objective is to develop a workforce that can bring existing commercial buildings up to their energy performance potential and ensure that new commercial buildings do not fall below their expected optimal level of performance. Commercial building equipment technicians participating in this training program will learn how to best operate commercial buildings to ensure they reach their expected energy performance level. The training is a combination of classroom, online and on-site lessons. The Texas Engineering Extension Service (TEEX) developed curricula using subject matter and adult learning experts to ensure the training meets certification requirements and accreditation standards for training these technicians. The training targets a specific climate zone to meets the needs, specialized expertise, and perspectives of the commercial building equipment technicians in that zone. The combination of efficient operations and advanced design will improve the internal built environment of a commercial building by increasing comfort and safety, while reducing energy use and environmental impact. Properly trained technicians will ensure equipment operates at design specifications. A second impact is a more highly trained workforce that is better equipped to obtain employment. Organizations that contributed to the development of the training program include TEEX and the Texas Engineering Experiment Station (TEES) (both members of The Texas A&M University System). TEES is also a member of the Building Commissioning Association. This report includes a description of the project

  18. Low-energy house in Sisimiut - Measurement equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hvidthoeft Delff Andersen, P.; Rode, C.; Madsen, Henrik

    2013-08-15

    This paper documents the measurement equipment in a low-energy house in Sisimiut, Greenland. Detailed measurements are being taken on energy consumption, indoor temperatures, floor heating, ventilation, open/closed state of doors and windows, and indoors climate. Equipped with a central control unit, experiments can be designed in order to study heat dynamics of the building. It is described how to plan and execute such experiments in one apartment in the building. The building also features both a solar thermal system and extra buffer tank facilitating testing of storage strategies on the power generated by the solar thermal system. A weather station equipped with thermometer, pyranometer and anemometer is installed on the building as well. Finally, it is described how to retrieve data from an SQL server which is configured to take monthly backups. R functions have been implemented to fetch and prepare the data for time series analysis. Examples are given on the use of these. (Author)

  19. Metrology Needs for Predicting Concrete Pumpability

    Directory of Open Access Journals (Sweden)

    Myoungsung Choi

    2015-01-01

    Full Text Available With the increasing use of pumping to place concrete, the development and refinement of the industry practice to ensure successful concrete pumping are becoming important needs for the concrete construction industry. To date, research on concrete pumping has been largely limited to a few theses and research papers. The major obstacle to conduct research on concrete pumping is that it requires heavy equipment and large amounts of materials. Thus, developing realistic and simple measurement techniques and prediction tools is a financial and logistical challenge that is out of reach for small research labs and many private companies in the concrete construction industry. Moreover, because concrete pumping involves the flow of a complex fluid under pressure in a pipe, predicting its flow necessitates detailed knowledge of the rheological properties of concrete, which requires new measurement science. This paper summarizes the technical challenges associated with concrete pumping and the development in concrete pumping that have been published in the technical literature and identifies future research needed for the industry to develop best practices for ensuring successful concrete pumping in the field.

  20. Final disposal of spent nuclear fuel-equipment for site characterization

    International Nuclear Information System (INIS)

    Almen, K.; Hansson, K.; Johansson, B.E.; Nilsson, G.; Andersson, O.; Wikberg, P.; Aahagen, H.

    1983-05-01

    The suitability of a certain geological formation as a repository for the final disposal of spent nuclear fuel can be determined only after detailed investigation and analysis. The purpose of the investigations is to provide information on the geology and the hydrology and chemistry of the site concerned. The value of these data largely depends on the way in which they have been collected. The report of the findings should enable the investigating party to evaluate the function and the accuracy of the equipment with which field data have been collected for KBS 3. This report describes the geophysical equipment, the hydraulic testing equipment, the water chemistry sample extracting equipment and the core-logging equipment used. The objectives of the instrument development have been: - to obtain a high data quality. - to collect data automatically in logs and tape recorders for direct transfer to a central processing unit. - to provide back-up in order to counteract loss of data. - to make instrument more efficient. (author)

  1. Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 3. Recommendations for improvement of equipment qualification methodology and criteria. Volume 3

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-08-01

    The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 3 presents recommendations for improvement of equipment qualification methodology and procedural clarification/modification. The fifth category identifies issues where adequate information does not exist to allow a recommendation to be made

  2. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  3. Application of the small trackless equipments in Benxi uranium mine

    International Nuclear Information System (INIS)

    Lei Zeyong; Liu Shengzheng

    2004-01-01

    The application of the small trackless equipments in Benxi uranium mine is introduced in this paper. The running data of these equipments are tested and discussed. It is proved that these equipments can run normally and meet the needs of uranium mining. Some experimental data will be very useful for building small mines and rebuilding small mines in China

  4. Choice of drilling equipment for surface mines of the Banovici and Djurdjevik coal basins

    Energy Technology Data Exchange (ETDEWEB)

    Kljucanin, T.; Cilovic, I.; Novak, I.; Tomic, R.

    1988-07-01

    Discusses factors influencing drilling equipment productivity at the Turija, Grivice and Potocari mines. When no reliable correlations were found in geomechanical analyses of overburden from different rigs, large-scale in field observations were made of overburden drilling. Four types of drilling equipment were in use in combination with 8 different shovel excavators (bucket capacity 5-20 m{sup 3}). Gives full details of the equipment considered and concludes by recommending the use of 110-115 mm diameter drilling equipment in combination with 8-9 m{sup 3} shovel excavators and also 150 mm diameter drilling equipment with larger capacity (18-20 m{sup 3}) excavators. 4 refs.

  5. Status of mapping for pre-detailing and projects of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gil, Fabio Vinicius Fontoura; Paoletto, Bonatto Silvia M. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    Considering the ever growing need for widening and supplying of the national energy matrix, ESTEIO Engenharia e Aerolevantamentos SA presents its participation in the Pipeline area, through Cartography activities, pointing out the performance on strips yet to be implanted, with activities as aerial survey, laser surveys, creation of orthophotomap, tracing definition, rivers crossing, geotechnical surveys, cadaster, creation of cadaster maps, strips, basic project drawings, imagery maps, as well as activities for existing strips, such as: aerial survey, laser surveys, strips enlargements, new property surveys, detection of pipelines through PCM technology, planimetric survey of equipment, besides activities for Pipeline Strips Geometry - FEED - pointing out the detailing of the areas which will be used for the dumping of the digging material and definition of accesses to the pipeline strips. We shall also present the technological evolution and consequent product improvements, considering surveys performed with conventional and digital aerial survey cameras, besides laser data. (author)

  6. What are the external consulting needs?

    International Nuclear Information System (INIS)

    Limousin, S.; Crombez, S.; Monin, L.

    2010-01-01

    Obtaining and maintaining a high level of competence for designing, manufacturing and operating nuclear pressure equipment is the responsibility of manufacturers and licensees. However to make comprehensive and sound decisions a regulator needs independent expertise. ASN has just created a new 'standing committee' on nuclear pressure equipment. Added to that, ASN relies on his historical technical support IRSN, in particular on safety related topics or during reactor outages, when decisions need to be made in a short time. In the field of nuclear pressure equipment, it is often useful to compare practices with those in non nuclear industry. In such cases, ASN can contract with other technical support. For the conformity assessment of new equipment, French regulations states that ASN can delegate to accredited third party bodies part or the entire conformity assessment. (authors)

  7. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  8. An analysis of USMC heavy construction equipment (HCE) requirements

    OpenAIRE

    Blaxton, Allen C.; Fay, Michael J.; Hansen, Cheryl M.; Zuchristian, Christopher M.

    2003-01-01

    MBA Professional Report Approved for public release; distribution is unlimited. According to I and L, HQMC, the Marine Corps needs to re-evaluate current operational requirements for engineer construction equipment. Acquisition and force allocation levels for equipment have remained essentially at constant 1970's, Cold War levels. Because acquisition and allocation levels haven't changed at the same rate as personnel, there is a perception that much of the existing equipment is unnecess...

  9. Recommended practices and guidelines for procurement of magnetic-fusion-energy electrical equipment

    International Nuclear Information System (INIS)

    1982-06-01

    The followng three chapters are included: (1) administrative guidelines, (2) technical practices, and (3) check list. The first two chapters contain detailed information which is to be used as a reference by specification writers in preparing specifications. Chapter 3 is intended to provide a uniform specification format for specification writers, and is further intended to satisfy equipment manufactures' complaints that different specification formats are used to describe essentially identical equipment

  10. Research program for seismic qualification of nuclear plant electrical and mechanical equipment. Task 4. Use of fragility in seismic design of nuclear plant equipment. Volume 4

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-08-01

    The Research Program for Seismic Qualification of Nuclear Plant Electrical and Mechanical Equipment has spanned a period of three years and resulted in seven technical summary reports, each of which have covered in detail the findings of different tasks and subtasks, and have been combined into five NUREG/CR volumes. Volume 4 presents study of the use of fragility concepts in the design of nuclear plant equipment and compares the results of state-of-the-art proof testing with fragility testing

  11. Annual report of the group for maintenance of electrical equipment

    International Nuclear Information System (INIS)

    Rajic, M.

    1965-01-01

    This report includes detailed description of repairs and revisions of the electrical equipment of the RA reactor which were done according to the annual plan during the periods when reactor was not operated. Unplanned repairs are part of this report as well [sr

  12. Rules and procedures for the design and operation of hazardous research equipment

    International Nuclear Information System (INIS)

    1978-12-01

    The manual has been prepared for use by research personnel involved in experiments at the Lawrence Berkeley Laboratory. It contains rules and procedures for the design, test, installation, and operation of hazardous research equipment. Sect. I contains such information as responsibility of experimenters for safety, descriptions of the various Laboratory safety organizations, and enumeration of various services available to experimenters at the Laboratory. Sect. II describes specific rules for the setup and operation of experimental equipment at the Laboratory. Sect. III gives detailed design criteria and procedures for equipment frequently encountered in the high energy physics laboratory

  13. Dosimetry and optimization in digital radiography based on the detail contrast resolution

    Energy Technology Data Exchange (ETDEWEB)

    Gomes B, W. O. [Instituto Federal da Bahia, Rua Emidio dos Santos s/n, Barbalho 40301-015, Salvador de Bahia (Brazil); Gomes de C, A., E-mail: wilsonottobatista@gmail.com [Secretaria de Saude do Estado da Bahia, Salvador de Bahia (Brazil)

    2016-10-15

    In digital radiography, computed radiography systems (CR) and portable panels a-Si (DR) are adapted to equipment previously used for the system screen / film. Therefore it maintains the characteristics as grid, filtration, yield, etc. Otherwise, the systems dedicated with a-Si panels (DR), are designed to operate with these image receptors. The ability to detect in low contrast details is reduced for all systems with increasing ratio of scattered radiation / primary radiation. In this context there is a need to acquire experience and adjust exposure protocols to ensure the quality of the image with maintaining kerma values in the surface as low as possible. The contrast resolution is defined as the ability of the system to distinguish similar degrees of attenuation of the object and is a parameter used to maintain the quality index and comparison between different systems. The protocols were: chest (90 and 102 kV with the range of 2-20 m As) and abdomen (80 kV in the range of 10-80 m As). Kerma values were evaluated with a solid state sensors. Based on analysis of these curves C-D, which identified the technique would imply a lower kerma input surface while maintaining image quality from the point of view of contrast-detail resolution. The results show that the IQFinv varies little throughout the range of m As, while the value of kerma varies linearly with in m As. Also, the complete analysis of the curves indicate that there was an increase in the definition of detail with increasing m As. The conclusion is that, in the transition phase of the new receivers are needed to assess and adjust practiced protocols to ensure the quality index of the image taking into account aspects of radiation protection of the patient. And even with digital technology, good radiographic technique should be practiced. (Author)

  14. High energy arcing fault fires in switchgear equipment : a literature review.

    Energy Technology Data Exchange (ETDEWEB)

    Nowlen, Steven Patrick; Brown, Jason W.; Wyant, Francis John

    2008-10-01

    In power generating plants, switchgear provide a means to isolate and de-energize specific electrical components and buses in order to clear downstream faults, perform routine maintenance, and replace necessary electrical equipment. These protective devices may be categorized by the insulating medium, such as air or oil, and are typically specified by voltage classes, i.e. low, medium, and high voltage. Given their high energy content, catastrophic failure of switchgear by means of a high energy arcing fault (HEAF) may occur. An incident such as this may lead to an explosion and fire within the switchgear, directly impact adjacent components, and possibly render dependent electrical equipment inoperable. Historically, HEAF events have been poorly documented and discussed in little detail. Recent incidents involving switchgear components at nuclear power plants, however, were scrupulously investigated. The phenomena itself is only understood on a very elementary level from preliminary experiments and theories; though many have argued that these early experiments were inaccurate due to primitive instrumentation or poorly justified methodologies and thus require re-evaluation. Within the past two decades, however, there has been a resurgence of research that analyzes previous work and modern technology. Developing a greater understanding of the HEAF phenomena, in particular the affects on switchgear equipment and other associated switching components, would allow power generating industries to minimize and possibly prevent future occurrences, thereby reducing costs associated with repair and downtime. This report presents the findings of a literature review focused on arc fault studies for electrical switching equipment. The specific objective of this review was to assess the availability of the types of information needed to support development of improved treatment methods in fire Probabilistic Risk Assessment (PRA) for nuclear power plant applications.

  15. Improved Biomass Cooking Stoves and Improved Stove Emission Equipment

    Energy Technology Data Exchange (ETDEWEB)

    HATFIELD, MICHAEL; Still, Dean

    2013-04-15

    In developing countries, there is an urgent need for access to safe, efficient, and more affordable cooking technologies. Nearly 2.5 billion people currently use an open fire or traditional cookstove to prepare their meals, and recent models predict that use of biomass for cooking will continue to be the dominant energy use in rural, resource-poor households through 2030. For these families, cooking poses serious risks to health, safety, and income. An alarming 4 million people, primarily women and children, die prematurely each year from indoor and outdoor exposure to the harmful emissions released by solid fuel combustion. Use of traditional stoves can also have a significant impact on deforestation and climate change. This dire situation creates a critical need for cookstoves that significantly and verifiably reduce fuel use and emissions in order to reach protective levels for human health and the environment. Additionally, advances in the scientific equipment needed to measure and monitor stove fuel use and emissions have not kept pace with the significant need within the industry. While several testing centers in the developed world may have hundred thousand-dollar emissions testing systems, organizations in the field have had little more than a thermometer, a scale, and subjective observations to quantify the performance of stove designs. There is an urgent need for easy-to-use, inexpensive, accurate, and robust stove testing equipment for use by laboratory and field researchers around the world. ASAT and their research partner, Aprovecho Research Center (ARC), have over thirty years of experience addressing these two needs, improved cookstoves and emissions monitoring equipment, with expertise spanning the full spectrum of development from conceptual design to product manufacturing and dissemination. This includes: 1) research, design, and verification of clean biomass cookstove technology and emissions monitoring equipment; 2) mass production of quality

  16. The improvement of maintenance service for traction networks equipment on the base of process approach

    Directory of Open Access Journals (Sweden)

    D. V. Mironov

    2014-12-01

    Full Text Available Purpose. The new methods development for improving the maintenance service for equipment of traction networks in order to increase its efficiency and quality. Methodology. In world practice of solving problems related to the quality of products and services is usually achieved by introducing quality management system in to the enterprises. The provisions of quality management system were used for solving the problem. The technologies of process engineering were used for describing the main stages of maintenance service. Findings. The development of high-speed movement and growth of its intensity, the use of electric rolling stock of a new generation require the introduction of new methods diagnostics of equipment technical state and improvement of the existing maintenance system and repair of power supply. Developing a model of business-processes, their optimization with using techniques of process engineering and system management is needed for the transition to the management system based on the process approach. From the standpoint of the process approach and in accordance with the requirements of the quality management system (ISO 9001-2009, the operation of the E (Department of electrification and power supply infrastructure sector is represented as a scheme of business-processes in which the guaranteed supply with electricity of railway and third-party consumers is defined as the main business-process of management. Each of the sub-process of power supply for consumers is described in details. The use methods and main stages of process approach for sample management system reorganization were investigated. The methodology and the application method of PDCA (Plan-Do-Check-Act closed loop to the equipment maintenance system were described. The monitoring process of traction networks maintenance using the process approach was divided into components after investigations. The technical documentation of maintenance service was investigated in

  17. INDIVIDUAL AND ORGANIZATIONAL VARIABLES AFFECTING THE USE OF PERSONAL PROTECTIVE EQUIPMENT

    Directory of Open Access Journals (Sweden)

    TUNÇ DEMİRBİLEK

    2013-06-01

    Full Text Available Management’s safety approach and commitment are related to occupational health and safety applications in workplaces. However, personal characteristics and attitudes on their health of employees are very influential factors on occupational health and safety applications. For examine of interaction between behaviors and the health and safety applications it is required that determine of employee’s perceptions. For this reason this paper’s purpose is to establish of safety needs, attitudes and behaviors of employees and their perceptions regarding management’s safety approach and applications. The study’s focal point is use of personal protective equipment as an indicator “safety behavior”. In empirical study, assumption variables regarding the use of personal protective equipment are safety effectively, safety need, management attitudes and protective equipment conditions. The fundamental hypothesis of this paper is use of personal protective equipment is related to individual and organizational variables. Implications of research findings are to indicate impelling the workers to safety behaviour or using the personal protective equipment by their feeling of the safety behaviour and availability of personal protective equipment.

  18. Equipment decontamination: A brief survey of the DOE complex

    International Nuclear Information System (INIS)

    Conner, C.; Chamberlain, D.B.; Chen, L.; Vandegrift, G.F.

    1995-03-01

    Deactivation at DOE facilities has left a tremendous amount of contaminated equipment behind. In-situ methods are needed to decontaminate the interiors of the equipment sufficiently to allow either free release or land disposal. A brief survey was completed of the DOE complex on their needs for equipment decontamination with in-situ technology to determine (1) the types of contamination problems within the DOE complex, (2) decontamination processes that are being used or are being developed within the DOE, and (3) the methods that are available to dispose of spent decontamination solutions. In addition, potential sites for testing decontamination methods were located. Based on the information obtained from these surveys, the Rocky Flats Plant and the Idaho National Engineering Laboratory appear to be best suited to complete the initial testing of the decontamination processes

  19. A self-fitting hearing aid: need and concept.

    Science.gov (United States)

    Convery, Elizabeth; Keidser, Gitte; Dillon, Harvey; Hartley, Lisa

    2011-12-01

    The need for reliable access to hearing health care services is growing globally, particularly in developing countries and in remotely located, underserved regions in many parts of the developed world. Individuals with hearing loss in these areas are at a significant disadvantage due to the scarcity of local hearing health care professionals and the high cost of hearing aids. Current approaches to making hearing rehabilitation services more readily available to underserved populations include teleaudiology and the provision of amplification devices outside of the traditional provider-client relationship. Both strategies require access to such resources as dedicated equipment and/or specially trained staff. Another possible strategy is a self-fitting hearing aid, a personal amplification device that is equipped with an onboard tone generator to enable user-controlled, automated, in situ audiometry; an onboard prescription to determine the initial hearing aid settings; and a trainable algorithm to enable user-controlled fine-tuning. The device is thus assembled, fitted, and managed by the user without the need for audiological or computer support. This article details the self-fitting concept and its potential application in both developing and developed countries. Potential advantages and disadvantages of such a device are discussed, and considerations for further investigations into the concept are presented. Overall, the concept is considered technologically viable with the main challenges anticipated to be development of clear, simple user instructions and a delivery model that ensures reliable supplies of instant-fit ear tips and batteries.

  20. Equipment size effects on open pit mining performance

    Energy Technology Data Exchange (ETDEWEB)

    A. Bozorgebrahimi; R.A. Hall; M.A. Morin [University of British Columbia, Vancouver, BC (Canada). Mining Engineering Department

    2005-03-01

    This paper discusses the exploitation of economies of scale in open pit mining through the use of increasingly larger equipment. It presents a method adopted to evaluate the impact of increased scale on operational performance factors. The work identifies equipment size sensitive variables (ESSVs) in the mine design process that affect the performance of the production process. Data from a set of case studies show that the ESSV influence extends beyond mine production to encompass milling performance, environmental footprint and community impacts. Some ESSVs (such as reliability, tyre costs and productivity) are shown to be related to the current state of equipment technology and their effects are therefore comparable for different mines. Other ESSVs relate to the mine and deposit characteristics; their effects therefore vary from mine to mine. A detailed analytical approach, developed to model the impact of ESSVs, suggests that for truck/shovel operations, the industry may be approaching a situation of diseconomies of scale.

  1. Low-Load Space Conditioning Needs Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Puttagunta, Srikanth [Consortium for Advanced Residential Buildings, Norwalk, CT (United States)

    2015-05-01

    With limited low-load options in the HVAC market, many new-construction housing units are being fitted with oversized equipment - thus facing penalties in system efficiency, comfort, and cost. To bridge the gap between currently available HVAC equipment and the rising demand for low-load HVAC equipment in the marketplace, HVAC equipment manufacturers need to be fully aware of multifamily buildings and single-family homes market needs. Over the past decade, Steven Winter Associates, Inc. (SWA) has provided certification and consulting services on hundreds of housing projects and has accrued a large pool of data. CARB compiled and analyzed these data to see what the thermal load ranges are in various multifamily apartments and attached single-family home types (duplex and townhouse). In total, design loads from 941 dwellings from SWA's recent multifamily and attached single-family work across the Northeast and Mid-Atlantic were analyzed. Information on the dwelling characteristics, design loads, and the specifications of installed mechanical equipment were analyzed to determine any trends that exist within the dataset.

  2. Low-Load Space Conditioning Needs Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Puttagunta, Srikanth [Consortium for Advanced Residential Buildings (CARB), Norwalk, CT (United States)

    2015-05-19

    Heating, ventilating, and air-conditioning (HVAC) equipment must be right-sized to ensure energy performance and comfort. With limited low-load options in the HVAC market, many new-construction housing units are being fitted with oversized equipment that creates system efficiency, comfort, and cost penalties. To bridge the gap between currently available HVAC equipment that is oversized or inefficient and the rising demand for low-load HVAC equipment in the marketplace, HVAC equipment manufacturers need to be fully aware of the needs of the multifamily building and attached single-family (duplex and townhouse) home market. Over the past decade, Steven Winter Associates, Inc. (SWA) has provided certification and consulting services for hundreds of housing projects and has accrued a large pool of data that describe multifamily and attached single-family home characteristics. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings (CARB) compiled and analyzed these data to outline the characteristics of low-load dwellings such as the heating and cooling design loads.

  3. Costs and indices for domestic oil and gas field equipment and production operations, 1992--1995

    International Nuclear Information System (INIS)

    1996-08-01

    This report presents estimated costs and cost indices for domestic oil and natural gas field equipment and production operations for 1992, 1993, 1994, and 1995. The costs of all equipment and services are those in effect during June of each year. The sum (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measured do not capture changes in industry-wide costs exactly because of annual variations in the ratio of the total number of oil wells to the total number of gas wells. The detail provided in this report is unavailable elsewhere. The body of this report contains summary tables, and the appendices contain detailed tables

  4. Homemade Equipment for the Teaching of Electrochemistry at Advanced Level: Part III.

    Science.gov (United States)

    Chan, K. M.

    1985-01-01

    Describes: (1) thermometric titrations; (2) EM-5 equipment (consisting of a thermal sensor, calorimeter, and input-buffered amplifier); (3) acid-base titrations; (4) precipitation titrations; and (5) redox titrations. Detailed procedures are included. (JN)

  5. Equipment Sustainment Data in Standard Army Management Information Systems: Needs, Gaps, and Opportunities

    Science.gov (United States)

    2012-01-01

    DRMO Defense Reutilization and Marketing Service DS Direct Support ECR Equipment Control Record ERP Enterprise Resource Planning ESA Enterprise...and content. The Global Combat Support System-Army (GCSS-A) is an automated logistics system that uses the SAP Defense Forces and Public Security...DFPS) software platform to provide Enterprise Resource Planning ( ERP ). It is designed to integrate tactical logistics data and functions as related

  6. Equipment Obsolescence Analysis and Management Software

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.; Carret, L.; Shaon, S.; Schultz, C.

    2015-07-01

    The procurement engineering resources at Nuclear Power Plants (NPPs) are experiencing increasing backlog for procurement items primarily due to the inability to order the original replacement parts. The level of effort and time required to prepare procurement packages is increasing since the number of obsolete parts are increasing exponentially. Procurement packages for obsolete components and parts are much more complex and take more time to prepare because of the need to perform equivalency evaluations, testing requirements and test acceptance criteria development, commercial grade dedication or equipment qualification, and increasing efforts to verify that no fraudulent or counterfeit parts are procured. This problem will be further compounded when NPPs pursue license renewal and approval for plant-life extension. Advanced planning and advanced knowledge of equipment obsolescence is required to allow for sufficient time to properly procure replacement parts for obsolete items. The uncertain supply chain capability due to obsolescence is a real problem and can cause a risk to reliable plant operations due to the potential for a lack of available spare parts and replacement components to support outages and unplanned component failures. Advanced notification of obsolescence is increasingly more important to ensure that adequate time and planning is scheduled to procure the proper replacement parts. A thorough analysis of Original Equipment Manufacturer (OEM) availability and inventory as well as an analysis of failure rates and usage rates is required to predict critical part needs to allow for early identification of obsolescence issues so that a planned and controlled strategy to qualify replacement equipment can be implemented. (Author)

  7. User's manual for the master equipment list. Phase 1

    International Nuclear Information System (INIS)

    Sandoval, J.D.

    1997-01-01

    This manual is intended to provide a user with enough detailed instruction to guide them through the Master Equipment List Phase 1 (MEL Phase 1) application system operations. The MEL Phase 1 application is a database system that stores Equipment Identification Number (EIN) information to support equipment tracking in the 200E and 200W Tank Farms for the Tank Waste Remediation System Division. The MEL Phase 1 application supports both the user application and administrative control functions. The user application functions include: viewing by Folder, reporting, performing queries, and editing specific data. The administrative control functions include: maintaining valid user identifications, passwords, privileges, defining drop-down lists, and review of the change log relating to EIN data entries, additions, deletions, and editing. The scope of this User's Manual is to discuss these functions and is intended to guide users and answer questions regarding the MEL Phase 1 application

  8. Construction of experience feedback system for equipment supervision in nuclear engineering

    International Nuclear Information System (INIS)

    Zou Pingguo; Zhang Liying; Zhang Wenzhong

    2009-01-01

    Based on the analysis of the experience sources on equipment supervision in nuclear engineering, the details of the organization principle, working flow, and report requirement for the experience feedback system are introduced. The function range and its roll in the experience feedback system of the nuclear authority, nuclear power plant owners and equipment supervision organizations are illustrated. The standardization working requirements in the information gathering, analyzing, feedback and tracking process, and the characteristics and form of the incident report and feedback report are proposed. It emphasizes that the method for combined analysis of one significant incident and the whole incidents shall be adopted in the information analysis, and the experience feedback shall be considered in the development of equipment supervision technique and the equipment manufacturing, thus to maximize the use of experience feedback information to improve the pertinency and effectiveness of the experience feedback system. (authors)

  9. Double-Shell Tanks System Maintenance and Recovery Needs Report

    International Nuclear Information System (INIS)

    SMITH, D.F.

    2002-01-01

    This report represents an initial effort to identify maintenance equipment needed to support critical components used for delivery of waste feed to the Waste Isolation and Treatment Plant (WTP). Rough estimates of cost benefits for selected maintenance capabilities are provided. A follow-on to this report should include a detailed cost analysis showing cost benefits and tradeoffs in selection and development of specific maintenance capabilities. Critical component failures during delivery of waste feed from the DSTs to the WTP have the potential to idle WTP facilities if the duration of the recovery operations are long enough to allow the WTP to exhaust a planned 60-day lag storage capacity for waste feed. If a critical component within the transfer route fails, current planning does not provide for an alternative HLW feed source. Critical components with relatively high failure frequencies and recovery times are identified, along with a summary of documentation regarding historical maintenance and recovery operations and planning. Components, such as mixer pumps and transfer pumps, are estimated to have relatively long recovery times due, in part, to the current practice of sending spare pumps, when needed, off-site to a remote location, for vendor refurbishment and testing prior to installation in a tank. No capability is provided on-site for pump ''run-in''. As neither the spare pumps in storage, installed pumps, or other critical components are subjected to periodic preventive maintenance, and these critical components are planned to be operated intermittently over a long period of time, component failures are to be expected. Recommendations are made for further analysis to identify specific equipment cost benefits, development costs, and tradeoffs in selection of alternatives. This new equipment will provide capabilities for component storage and maintenance in line with vendor recommendations, reduce the duration of recovery operations, and support personnel

  10. Quantifying Pollutant Emissions from Office Equipment Phase IReport

    Energy Technology Data Exchange (ETDEWEB)

    Maddalena, R.L.; Destaillats, H.; Hodgson, A.T.; McKone, T.E.; Perino, C.

    2006-12-01

    Although office equipment has been a focal point for governmental efforts to promote energy efficiency through programs such as Energy Star, little is known about the relationship between office equipment use and indoor air quality. This report provides results of the first phase (Phase I) of a study in which the primary objective is to measure emissions of organic pollutants and particulate matter from a selected set of office equipment typically used in residential and office environments. The specific aims of the overall research effort are: (1) use screening-level measurements to identify and quantify the concentrations of air pollutants of interest emitted by major categories of distributed office equipment in a controlled environment; (2) quantify the emissions of air pollutants from generally representative, individual machines within each of the major categories in a controlled chamber environment using well defined protocols; (3) characterize the effects of ageing and use on emissions for individual machines spanning several categories; (4) evaluate the importance of operational factors that can be manipulated to reduce pollutant emissions from office machines; and (5) explore the potential relationship between energy consumption and pollutant emissions for machines performing equivalent tasks. The study includes desktop computers (CPU units), computer monitors, and three categories of desktop printing devices. The printer categories are: (1) printers and multipurpose devices using color inkjet technology; (2) low- to medium output printers and multipurpose devices employing monochrome or color laser technology; and (3) high-output monochrome and color laser printers. The literature review and screening level experiments in Phase 1 were designed to identify substances of toxicological significance for more detailed study. In addition, these screening level measurements indicate the potential relative importance of different categories of office equipment

  11. Verification of the thermal design of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hienonen, R.; Karjalainen, M.; Lankinen, R. [VTT Automation, Espoo (Finland). ProTechno

    1997-12-31

    The project `Verification of the thermal design of electronic equipment` studied the methodology to be followed in the verification of thermal design of electronic equipment. This project forms part of the `Cool Electronics` research programme funded by TEKES, the Finnish Technology Development Centre. This project was carried out jointly by VTT Automation, Lappeenranta University of Technology, Nokia Research Center and ABB Industry Oy VSD-Technology. The thermal design of electronic equipment has a significant impact on the cost, reliability, tolerance to different environments, selection of components and materials, and ergonomics of the product. This report describes the method for verification of thermal design. It assesses the goals set for thermal design, environmental requirements, technical implementation of the design, thermal simulation and modelling, and design qualification testing and the measurements needed. The verification method covers all packaging levels of electronic equipment from the system level to the electronic component level. The method described in this report can be used as part of the quality system of a corporation. The report includes information about the measurement and test methods needed in the verification process. Some measurement methods for the temperature, flow and pressure of air are described. (orig.) Published in Finnish VTT Julkaisuja 824. 22 refs.

  12. Fiscal 1998 survey report. Welfare equipment (Development of human friendly care support intelligent equipment / Development of home welfare equipment system); 1998 nendo chosa hokokusho. Fukushi kiki (human friendly kaigo shien chino kiki kaihatsu / zaitaku fukushi kiki system kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Since disabled persons increase with a progress of an aging society, while a care power decreases with a decrease in birth rate, development and practical use of the welfare equipment contributing to self-support of aged and handicapped persons, reduction of doctors' or therapists' burdens, and as a result, reduction of medical care costs are desirable. Among them, R and D and practical use are expected of the advanced welfare equipment and system based on human engineering technology contributing to improvement of lives of aged and handicapped persons, and support of nurses and cares of disabled persons. In fiscal 1998, on both human friendly care support intelligent equipment and home welfare equipment system, this project clarified essential technical issues based on the future view, selected some themes to be newly developed in the future, and surveyed and evaluated the details of their R and D concretely. For the former, 'heart disease diagnosis and treatment total support system,' and for the latter, 'body function rehabilitation support system' were surveyed. (NEDO)

  13. Study on applicability of evaluation model of manpower needs for dismantling of equipments in FUGEN-1. Dismantling process in 3rd/4th feedwater heater room

    International Nuclear Information System (INIS)

    Shibahara, Yuji; Izumi, Masanori; Nanko, Takashi; Tachibana, Mitsuo; Ishigami, Tsutomu

    2010-10-01

    Manpower needs for the dismantling process on the dismantling of equipments in FUGEN 3rd/4th feedwater heater room was calculated with the management data evaluation system (PRODIA Code), and it was inspected whether the conventional evaluation model had applicability for FUGEN or not. It was confirmed that the conventional evaluation model for feedwater heater had no applicability. In comparison of the calculated value with the actual data, we found two difference: 1) the calculated value were significantly larger than the actual data, 2) the actual data for the dismantling of 3rd feedwater heater was twice larger than that of 4th feedwater heater, though these equipments were almost same weight. It was found that these were brought 1) by the difference in the work descriptions of dismantling between JPDR and FUGEN, and 2) by that in the cutting number between 3rd feedwater heater and 4th one. The manpower needs for the dismantling of both feedwater heaters were calculated with a new calculation equation reflecting the descriptions of dismantling, and it was found that these results showed the good agreement with the actual data. (author)

  14. Power-Consumption Measurements for LTE User Equipment

    DEFF Research Database (Denmark)

    Lauridsen, Mads

    wireless communications test set and the Agilent N6705B DC power analyzer to establish a power consumption model for LTE user equipment (UE). The model is useful when you need to examine the UE battery life in system-level simulations. We will explain how the Agilent equipment can be used in manual tests......, but we do not discuss how to make automated tests (for example, using VEE software). In this application note, we analyze smartphones adhering to the 3GPP LTE standard [1]....

  15. MODULAR RESEARCH EQUIPMENT FOR ON-LINE INSPECTION IN ADVANCED MANUFACTURING SYSTEMS

    Directory of Open Access Journals (Sweden)

    Davrajh, S.

    2012-11-01

    Full Text Available The significance of inspection processes increases when producing parts with high levels of customer input. These processes must adapt to variations in significant product characteristics. Mass customisation and reconfigurable manufacturing are currently being researched as ways to respond to high levels of customer input. This paper presents the research and development of modular inspection equipment that was designed to meet the on-line quality requirements of mass customisation and reconfigurable manufacturing environments. Simulated results were analysed for application in an industrial environment. The implementation of the equipment in South Africa is briefly discussed. The research indicates that manufacturers need only invest in the required equipment configurations when they are needed for on-line inspection.

  16. Experimental equipment for an advanced ISOL facility

    International Nuclear Information System (INIS)

    Baktash, C.; Lee, I.Y.; Rehm, K.E.

    1999-01-01

    This report summarizes the proceedings and recommendations of the Workshop on the Experimental Equipment for an Advanced ISOL Facility which was held at Lawrence Berkeley National Laboratory on July 22--25, 1998. The purpose of this workshop was to discuss the performance requirements, manpower and cost estimates, as well as a schedule of the experimental equipment needed to fully exploit the new physics which can be studied at an advanced ISOL facility. An overview of the new physics opportunities that would be provided by such a facility has been presented in the White Paper that was issued following the Columbus Meeting. The reactions and experimental techniques discussed in the Columbus White Paper served as a guideline for the formulation of the detector needs at the Berkeley Workshop. As outlined a new ISOL facility with intense, high-quality beams of radioactive nuclei would provide exciting new research opportunities in the areas of: the nature of nucleonic matter; the origin of the elements; and tests of the Standard Model. After an introductory section, the following equipment is discussed: gamma-ray detectors; recoil separators; magnetic spectrographs; particle detectors; targets; and apparatus using non-accelerated beams

  17. Tool for the verification of geometrical parameters and constancy of image quality in radiology equipment

    International Nuclear Information System (INIS)

    Mayo, P.; Verdu Martin, G.; Rodenas Escriba, F.; Marin Peinado, B.; Camapyo Esteban Nogueira, J. M.; Diez Domingo, S.; Villaescusa Blanca, J. I.; Hernando Gonzalez, I.; Ruiz Manzano, P.; Rivas Ballarin, M. A.; Melcho Iniguez, M.; Asensio Martinez, M. I.

    2013-01-01

    This paper presents the application of an innovative tool developed for the detailed quality control of diagnostic equipment. We have tried to validate such a tool for verification of geometrical parameters and the evaluation of the constancy of the image quality in radiology equipment, evaluating their usefulness by various services of Radio physics and radiation protection of different hospitals. (Author)

  18. Functional Requirements for Continuation Period Equipment and Drilling

    International Nuclear Information System (INIS)

    Sweeney, J.J.

    2000-01-01

    For geophysical measurements, creating a functional requirement based on finding a specific-sized target at a specific depth is difficult because of the wide variation of subsurface and surface geologic conditions that can be encountered. An alternative approach used in this paper is to specify functional requirements based on what is needed to search for the effects of a given target within a reasonable background of environmental or geological variation (noise). There is a gap between what the state-of-the-art expert with a large amount of experience can be expected to accomplish and what a non-expert inspector with limited experience can do. There are also limitations because of the Treaty environment (equipment certification, transparency, managed access, etc.); thus, for OSI, we must opt for pragmatic approach. Equipment must be easy to use, rugged, and functional over a wide range of environmental conditions. Equipment should consist of commercially available technology. Well-established operational procedures should be used for taking measurements, reducing data, and presenting data, with software mostly provided by the manufacturer along with the equipment. Equipment should be used in conjunction with WGB-approved position-finding equipment capable of relative position determinations pertinent to the type of equipment and measurement

  19. A study on the real-time reliability of on-board equipment of train control system

    Science.gov (United States)

    Zhang, Yong; Li, Shiwei

    2018-05-01

    Real-time reliability evaluation is conducive to establishing a condition based maintenance system for the purpose of guaranteeing continuous train operation. According to the inherent characteristics of the on-board equipment, the connotation of reliability evaluation of on-board equipment is defined and the evaluation index of real-time reliability is provided in this paper. From the perspective of methodology and practical application, the real-time reliability of the on-board equipment is discussed in detail, and the method of evaluating the realtime reliability of on-board equipment at component level based on Hidden Markov Model (HMM) is proposed. In this method the performance degradation data is used directly to realize the accurate perception of the hidden state transition process of on-board equipment, which can achieve a better description of the real-time reliability of the equipment.

  20. Examining elite Parasport athletes with sport involvement and sports equipment.

    Science.gov (United States)

    Hambrick, Marion E; Hums, Mary A; Bower, Glenna G; Wolff, Eli A

    2015-01-01

    Elite athletes require the most advanced sports equipment to maintain their competitive edge, but manufacturers cannot always satisfy these athletes' specific equipment needs. Sport involvement can influence sports-equipment selections and is described as the process by which individuals rely on attitudes and belief systems to make sports-related consumption decisions. This study involved semistructured interviews with 5 elite Parasport athletes to identify and analyze the role of sport involvement in their selection of sports equipment. The results revealed that the athletes identified product limitations, created a collaborative environment, and promoted a culture of innovation to develop new sports products and address existing limitations. Theoretical and practical implications are discussed.

  1. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  2. Comparison between two models of elbow rehabilitation equipment

    Directory of Open Access Journals (Sweden)

    Vetrice Georgiana

    2017-01-01

    Full Text Available International studies have revealed that using continuous passive motion (CPM equipment as part of a rehabilitation program improves the recovery period and also diminishes the rehabilitation costs by about 50%. This explains the need for conceiving elbow joint rehabilitation equipment to help persons suffering from posttraumatic disabilities. In order to create the best model to meet the patients’ requirements this paper presents two constructive solutions of such equipment and a comparison between their designs. Both achieve the desired movements of the elbow joint: flexion-extension and pronation-supination and are actuated by pneumatic muscles, due to the multiple advantages of pneumatic actuation: low cost, compliance and favorable response to commands.

  3. Technology Roadmaps: Energy-efficient Buildings: Heating and Cooling Equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Buildings account for almost a third of final energy consumption globally and are an equally important source of CO2 emissions. Currently, both space heating and cooling as well as hot water are estimated to account for roughly half of global energy consumption in buildings. Energy-efficient and low/zero-carbon heating and cooling technologies for buildings have the potential to reduce CO2 emissions by up to 2 gigatonnes (Gt) and save 710 million tonnes oil equivalent (Mtoe) of energy by 2050. Most of these technologies -- which include solar thermal, combined heat and power (CHP), heat pumps and thermal energy storage -- are commercially available today. The Energy-Efficient Buildings: Heating and Cooling Equipment Roadmap sets out a detailed pathway for the evolution and deployment of the key underlying technologies. It finds that urgent action is required if the building stock of the future is to consume less energy and result in lower CO2 emissions. The roadmap concludes with a set of near-term actions that stakeholders will need to take to achieve the roadmap's vision.

  4. Evaluation of retrieval activities and equipment for removal of containers from the transuranic storage area retrieval enclosure

    International Nuclear Information System (INIS)

    Bannister, R.; Rhoden, G.; Davies, G.B.

    1995-09-01

    Since 1970, the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory has accepted over 55,000 cubic meters of Transuranic contaminated hazardous waste for interim storage. The waste has been neatly stored in ''cell'' configurations on adjoining, above ground asphalt pads at the Transuranic Storage Area (TSA). A number of reports have been supplied for review and comment describing the methodology and equipment proposed for retrieval of drums and boxes from a storage facility at the INEL site. The contract for this review requires two main issues to be addressed. First, the adequacy of equipment and methodology for the retrieval of containers which have been breached, lost structural integrity, or are otherwise damaged, Second, to review the strategies and equipment for retrieval of intact waste containers. These issues are presented in the following report along with additional detail in the methodology to complete the description of the operations required for retrieval under most operational scenarios. The documentation reviewed is considered to be at an interim stage and is therefore expected to be subject to the development of the methodology from the existing level of detail with input from the facility operators. This review aims to anticipate some of this development by providing suggested detailed methods of retrieval and equipment for both normal and abnormal operations

  5. Manual on Safety Aspects of the Design and Equipment of Hot Laboratories

    International Nuclear Information System (INIS)

    1969-01-01

    With the development of atomic energy application and research, hot laboratories are now being constructed in a number of countries. The present publication describes and discusses experience in several countries in designing equipment for these laboratories. The safe handling of highly radioactive substances is the main purpose of hot laboratory design and equipment. The manual aims at helping those persons, particularly in the developing countries, who plan to design and construct a new hot laboratory or modify an existing one. It does not deal in great detail with the engineering design of protective and handling equipment; these matters can be found in the comprehensive list of references. The manual itself covers only basic ideas and different approaches in the design of laboratory building, hot cells, shielded and glove boxes, fume cupboards, and handling and viewing equipment. Systems for transferring materials and main services are also discussed.

  6. Research on the use of data fusion technology to evaluate the state of electromechanical equipment

    Science.gov (United States)

    Lin, Lin

    2018-04-01

    Aiming at the problems of different testing information modes and the coexistence of quantitative and qualitative information in the state evaluation of electromechanical equipment, the paper proposes the use of data fusion technology to evaluate the state of electromechanical equipment. This paper introduces the state evaluation process of mechanical and electrical equipment in detail, uses the D-S evidence theory to fuse the decision-making layers of mechanical and electrical equipment state evaluation and carries out simulation tests. The simulation results show that it is feasible and effective to apply the data fusion technology to the state evaluation of the mechatronic equipment. After the multiple decision-making information provided by different evaluation methods are fused repeatedly and the useful information is extracted repeatedly, the fuzziness of judgment can be reduced and the state evaluation Credibility.

  7. Recycling-oriented characterization of small waste electrical and electronic equipment

    International Nuclear Information System (INIS)

    Chancerel, Perrine; Rotter, Susanne

    2009-01-01

    As a result of the continuous change in the design and function of consumer electrical and electronic products, the mechanical and material properties of the obsolete products, called waste electric and electronic equipment (WEEE), are highly variable. The variability within WEEE is explained by the number of different appliances, and the heterogeneity in composition of any given appliance. This paper reports on an extended investigation of the properties of WEEE, in particular small appliances. The investigation focuses on the analysis of the composition of about 700 single appliances. Firstly, analytical methods to characterize the waste equipment are described. The results of the experimental analyses show that the mechanical properties, the material composition, the polymer composition and the chemical composition of WEEE vary not only between equipment types with different functions, but also between single appliances within one equipment type. Data on hazardous and valuable substances in selected equipment types are presented. Using detailed data on the composition of individual appliances to calculate rates of recovery for assumed recycling processes demonstrates that the performance of recycling processes depends strongly on the composition of WEEE. Recycling-oriented characterization is, therefore, a systematic approach to support the design and the operation of recycling processes.

  8. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  9. Prototypical spent fuel rod consolidation equipment preliminary design report: Volume 2, Drawings

    International Nuclear Information System (INIS)

    1986-01-01

    This volume consists of 65 E size drawings and 4 sketches of the NUS spent fuel rod consolidation equipment. The drawings have been grouped into categories; a detailed list of the drawings is included. The sketches prepared during the preliminary design process have been included

  10. Instruction manual for the use of CSIR triaxial rock stress measuring equipment

    CSIR Research Space (South Africa)

    Coetzer, SJ

    1998-08-01

    Full Text Available This is an updated version of CSIR Report no ME 1763 entitled "Instruction manual for the use for the CSIR triaxial rock stress measuring equipment" by F A Vreede. The manual contains a detailed description of CSIR Triaxial rock stress measuring...

  11. Excavating and loading equipment for peat mining

    Science.gov (United States)

    Mikhailov, A. V.; Zhigulskaya, A. I.; Yakonovskaya, T. B.

    2017-10-01

    Recently, the issues of sustainable development of Russian regions, related to ensuring energy security, are more urgent than ever. To achieve sustainable development, an integrated approach to the use of local natural resources is needed. Practically in all north regions of the Russian Federation, peat as a local natural resource is widespread, which has a practical application in the area of housing services. The paper presents the evaluation of technologies for open-pit peat mining, as well as analysis of technological equipment for peat production. Special attention is paid to a question of peat materials excavating and loading. The problem of equipment selection in a peat surface mine is complex. Many features, restrictions and criteria need to be considered. Use of low and ultra-low ground pressure excavators and low ground pressure front-end loaders with full-range tires to provide the necessary floatation in the peat bog environment is offered.

  12. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  13. The method for assurance to operational safety of cryogenics equipment through definite maintenance

    International Nuclear Information System (INIS)

    Anghel, Vasile

    2004-01-01

    The present paper reports about a method of ensuring operational safety of cryogenics equipment through specific maintenance measures which imply a definite concept of maintainability and operational reliability, methods of maintenance, necessary logistic and necessary personnel. The stages of the concept should succeed in a logical order and must be based on detailed analyses of the process of maintenance. The method starts from the operation conditions of cryogenic equipment in nuclear regime. Thus maintenance policy must be well defined within the boundaries of the nuclear plant through definition of coherent objectives and responsibility delegation for the personnel implied in maintenance activity. This method ensures performance in maintenance and an efficient feedback from equipment analysis. (author)

  14. Supporting developers in addressing maintenance aspects: an empirical study in the industrial equipment manufacturing industry

    NARCIS (Netherlands)

    Mulder, W.

    2016-01-01

    Addressing maintenance aspects has become increasingly important in development projects of industrial equipment. Developers of such equipment need to address the maintenance aspects in order to achieve competitive equipment and service offerings. This research focuses on the identification of the

  15. Application of Equipment Monitoring Technology in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kang, H. T.; Lee, J. K.; Lee, K. D.; Jo, S. H.

    2012-01-01

    The major goal of nuclear power industries during the past 10 years is to increase reliability and utility capacity factor. As the capacitor factor, however, crept upward. it became harder to attain next percentage of improvement. Therefore other innovative technologies are required. By the technologies applied to the fossil power plants, equipment health monitoring was performed on equipment to maintain it in operable condition and contributed on improving their reliability a lot. But the equipment monitoring may be limited to the observation of current system states in nuclear power plant. Monitoring of current system states is being augmented with prediction of future operating states and predictive diagnosis of future failure states. Such predictive diagnosis is motivated by the need for nuclear power plants to optimize equipment performance and reduce costs and unscheduled downtime. This paper reviews the application of techniques that focus on improving reliability in nuclear power plant by monitoring and predicting equipment health and suggests how possible to support on-line monitoring

  16. Transport of bundles and equipment which contain radioactive material

    International Nuclear Information System (INIS)

    1987-01-01

    This norm settles down: 1) The requirements that should be completed in relation to safety precautions and protection against ionizing radiations during the transport radioactive material and/or equipment containing it, in order to avoid risks to the collective and the environment. 2) The basic information on procedures that will be completed in the event of happening accidents during the transport or the transit storage of radioactive material and/or equipment that contain it. 3) The measures of security and physical protection during the transport of radioactive material and/or equipment containing it. This norm is applied: 1) To all the ways of transport (by air, by ground and by ship, fluvial and marine) of radioactive material and/or equipment that contain it. 2) To all natural or legal, public or private person, devoted to install, produce, trade, market, import or export radioactive materials and/or equipment containing it, and that needs to transport them as main or secondary activity [es

  17. Contribution to a Theory of Detailed Design

    DEFF Research Database (Denmark)

    Mortensen, Niels Henrik

    1999-01-01

    It has been recognised, that literature actually do not propose a theory of detailed design. In this paper a theory contribution is proposed, linking part design to organ design and allowing a type of functional reasoning. The proposed theory satisfies our need for explaining the nature of a part...... structure, for support of synthesis of part structure, i.e. detailed design, and our need for digital modelling of part structures.The aim of this paper is to contribute to a design theory valid for detailed design. The proposal is based upon the theory's ability to explain the nature of machine parts...... and assemblies, to support the synthesis of parts and to allow the modelling, especially digital modelling of a part structure. The contribution is based upon Theory of Technical Systems, Hubka, and the Domain Theory, Andreasen. This paper is based on a paper presented at ICED 99, Mortensen, but focus...

  18. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  19. Costs and indices for domestic oil and gas field equipment and production operations 1994 through 1997

    International Nuclear Information System (INIS)

    1998-03-01

    This report presents estimated costs and cost indices for domestic oil and natural gas field equipment and production operations for 1994, 1995, 1996, and 1997. The costs of all equipment and services are those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of the total number of oil wells to the total number of gas wells. The detail provided in this report is unavailable elsewhere. The body of this report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (compliance costs and lease availability) have a significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas equipment and production operations

  20. TECHNICAL EQUIPMENT FOR SORTING APPLES BY SIZE

    Directory of Open Access Journals (Sweden)

    Vasilica Ştefan

    2012-01-01

    Full Text Available Need to increase the competitiveness of semi-subsistence farms, by valorisation of the fruits, led to research for designing of an equipment for sorting apples by size, in order to meet market requirement, pricing according to the size of the fruits.

  1. The use of adaptive equipment following total knee replacement

    OpenAIRE

    McNaught, Jamie; Paul, Lorna

    2015-01-01

    Introduction: This study evaluates the need for adaptive equipment following total knee replacement. There are no recent studies to guide occupational therapists in the optimum time adaptive equipment is required following total knee replacement.\\ud \\ud Method: A non-experimental, concurrent mixed methods approach was used. The study population was patients attending for total knee replacement at a large general hospital. Outcome measures were the Oxford Knee Score, the United Kingdom Functio...

  2. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2001-01-01

    Full text: The activity of ZdAJ in 2000 was focused on realisation of the Government-Ordered Project - 6/15 MeV Accelerator. The realisation was accomplished in two stages: - stage I should result in deriving principal operational parameters of the accelerator - stage 2 will result in full implementation of the control system providing optimum control of the equipment and automatic maintaining of its parameters. Within the frames of the first stage, a klystron modulator panel was finished and the design documentation of the mechanical supporting structure, the arm, accelerating structure, collimator and control panel were advanced. Manufacturing of the above sub-units in the workshop has started. In the frames of the Specific Project of the State Committee for Scientific Research, the improvement of Neptun lOPC accelerator was undertaken. The read-out of the monitor dose with atmospheric pressure and ambient temperature compensation has been introduced. New filters for equalising the photon and electron beam and new wedge filters have been designed. Changes in programming have been introduced, which improve the patient's safety by eliminating possible personnel errors and increase the accuracy of radiation fields read-out. In 2000 ZdAJ progressed in development of the Quality System conforming EN-ISO 9001 Standard by including the provisions of EN 46001 Standard. The Standard EN 46001: ''Quality Systems - Medical Equipment''. Detailed requirements related to application of EN ISO 9001 is an European Quality Standard extending the provisions of EN ISO 9001 Standard over the manufacturers of medical equipment. (author)

  3. A guide to qualification of electrical equipment for nuclear power plants. Final report, November 1983

    International Nuclear Information System (INIS)

    Marion, A.; Lamken, D.; Harrall, T.; Kasturi, S.; Holzman, P.; Carfagno, S.; Thompson, D.; Boyer, B.; Hanneman, H.; Rule, W.

    1983-09-01

    Equipment qualification demonstrates that nuclear power plant equipment can perform its safety function - that despite age or the adverse conditions of a design basis accident the equipment can work as needed. This report is a guide to the overall process of electrical equipment qualification. It should interest those who design such equipment, those who buy it, or test it, and even those who install and maintain it. (author)

  4. Ballooning test equipment for use in hot cells

    International Nuclear Information System (INIS)

    Broendsted, P.; Adrian, F.

    1979-12-01

    An equipment for testing the LOCA behaviour of irradiated cladding materials is described. The details of the construction and of the installation in the Hot Cells are reported. Pilot tests carried out showed that the performance of the system fulfills the basic experimental prerequisites, which were: heating rate of 2-3degC/s, final temperature 1150degC/s, internal pressure max. 30 atm, external pressure max. 1 atm, test atmosphere either air or steam. (author)

  5. Equipment and appliances for underwater operations. Pt. 2

    International Nuclear Information System (INIS)

    Krueger, P.

    1976-01-01

    The 6/75 edition of 'mt' reported on the 'ARGE underwater appliances' and the study on 'design development of appliances and equipment for underwater use' in a brief summary. One of these designs, the 'unmanned DSWS underwater appliance' was described in detail. The present article describes three further design developments mentioned in the above study and which are based on unmanned appliances connected to the mother-ship. These designs were developed by Preussag-Meerestechnik. (orig.) [de

  6. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  7. Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, B. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Musolino, S. V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Klemic, G. [US Dept. of Homeland Security National Security Technology Lab., New York, NY (United States)

    2017-06-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence management missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.

  8. Automated transmission system operation and management : meeting stakeholder information needs

    Energy Technology Data Exchange (ETDEWEB)

    Peelo, D.F.; Toom, P.O. [British Columbia Hydro, Vancouver, BC (Canada)

    1998-12-01

    Information monitoring is considered to be the fundamental basis for moving beyond substation automation and into automated transmission system operation and management. Information monitoring was defined as the acquisition of data and processing the data into decision making. Advances in digital technology and cheaper, more powerful computing capability has made it possible to capture all transmission stakeholder needs in a shared and automated operation and management system. Recognizing that the key to success in the development of transmission systems is automation, BC Hydro has initiated a long-term research and development project to develop the structure and detail of transmission system automation. The involvement of partners, be they utility or equipment suppliers, is essential in order to deal with protocol and similar issues. 3 refs., 1 tab., 3 figs.

  9. Study on highly reliable digital communication technology of reactor nuclear measuring equipment

    International Nuclear Information System (INIS)

    Gu Pengfei; Huang Xiaojin

    2007-01-01

    To meet the need of highly reliable of reactor nuclear measuring equipment, in allusion to the idiographic request of nuclear measuring equipment, the actual technical development and the application in industrial field, we design a kind of redundancy communication net based on PROFIBUS, and a kind of communication interface module based on redundancy PROFIBUS communication, which link the nuclear measuring equipment and PROFIBUS communication net, and also lay a foundation for advanced research. (authors)

  10. Development of ion/proton beam equipment for industrial uses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Byung Ho; Lee, J. H.; Cho, Y. S.; Joo, P. K.; Kang, S. S.; Song, W. S.; Kim, H. J.; Chang, G. H.; Bang, S. W

    1999-12-01

    KAERI has possessed design and fabrication technologies of various ion sources including Duoplasmatron and DuoPiGatron developed by R and D projects of the long-term nuclear technology development program. In order to industrialize ion beam equipments utilizing these ion sources, a technology transfer project for a technology transfer project for a domestic firm has been performed. Under this project, engineers of the firm have been trained through classroom lectures of ion beam principles and OJT, an ion/proton beam equipment (DEMO equipment) has been designed, assembled and commissioned jointly with the engineers. Quality of the ion sources has been quantified, and technologies for ion beam equipment construction, functional test and application research have been developed. The DEMO equipment, which consists of an ion source, power supplies, vacuum, cooling and target systems, has been fabricated and tested to secure stability and reliability for industrial uses. Various characteristic tests including high voltage insulation, beam extraction, beam current measuring, etc. have been performed. This DEMO can be utilized for ion sources development as well as ion beam process development for various industrial products. Engineers of the firm have been trained for the industrialization of ion beam equipment and joined in beam application technology development to create industrial needs of beam equipment. (author)

  11. The development of special equipment amplitude detection instrument based on DSP

    International Nuclear Information System (INIS)

    Dai Sidan; Chen Ligang; Lan Peng; Wang Huiting; Zhang Liangxu; Wang Lin

    2014-01-01

    Development and industrial application of special equipment plays an important role in the development of nuclear energy process. Equipment development process need to do a lot of tests, amplitude detection is a key test,it can analysis the device's electromechanical and physical properties. In the industrial application, the amplitude detection can effectively reflect the operational status of the current equipment, the equipment can also be a certain degree of fault diagnosis, identify problems in a timely manner. The main development target in this article is amplitude detection of special equipment. This article describes the development of special equipment amplitude detection instrument. The instrument uses a digital signal processor (DSP) as the central processing unit, and uses the DSP + CPLD + high-speed AD technology to build a complete set of high-precision signal acquisition and analysis processing systems, rechargeable lithium battery as the powered device. It can do a online monitoring of special equipment amplitude, speed parameters by acquiring and analysing the tachometer signal in the special equipment, and locally display through the LCD screen. (authors)

  12. Laser alignment of rotating equipment at PNL

    International Nuclear Information System (INIS)

    Berndt, R.H.

    1994-05-01

    Lateral vibration in direct-drive equipment is usually caused by misalignment. Over the years, because of the need to improve on techniques and ways of working more efficiently, various types of alignment methods have evolved. In the beginning, craftsmen used a straight-edge scale across the coupling with a feeler gauge measuring the misalignment error. This is still preferred today for aligning small couplings. The industry has since decided that alignment of large direct-drive equipment needed a more accurate type of instrumentation. Rim and face is another of the first alignment methods and is used on all sizes of equipment. A disadvantage of the rim and face method is that in most cases the coupling has to be disassembled. This can cause alignment problems when the coupling is reassembled. Also, the rim and face method is not fast enough to work satisfactorily on alignment of thermally hot equipment. Another concern is that the coupling has to be manufactured accurately for correct rim and face readings. Reverse dial alignment is an improvement over the rim and face method, and depending on the operator's experience, this method can be very accurate. A good training program along with field experience will bring the operator to a proper level of proficiency for a successful program. A hand-held computer with reverse dial calculations in memory is a must for job efficiency. An advantage over the rim and face method is that the coupling is not disassembled and remains locked together. Reverse dial instrumentation measures from both shaft center lines, rather than the coupling surface so the machining of the coupling during manufacture is not a major concern

  13. RA Reactor operation and maintenance (I-IX), Part III, Task 3.08/04-02 Refurbishment of the electrical equipment; Pogon i odrzavanje reaktora RA (I-IX), III Deo, Zadatak 3.08/04-02 Remont elektro opreme

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V; Nikolic, M; Poznanovic, B; Rajic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume contains detailed action plan for repair of electrical equipment of the RA reactor, the list of electrical equipment parts which were either repaired or exchanged for improvement of their performance. Detailed work describing the repair and maintenance work done of the listed equipment is part of this report. Equipment related to dosimetry and control systems are included as well.

  14. IFR fuel cycle process equipment design environment and objectives

    International Nuclear Information System (INIS)

    Rigg, R.H.

    1993-01-01

    Argonne National laboratory (ANL) is refurbishing the hot cell facility originally constructed with the EBR-II reactor. When refurbishment is complete, the facility win demonstrate the complete fuel cycle for current generation high burnup metallic fuel elements. These are sodium bonded, stainless steel clad fuel pins of U-Zr or U-Pu-Zr composition typical of the fuel type proposed for a future Integral Fast Reactor (IFR) design. To the extent possible, the process equipment is being built at full commercial scale, and the facility is being modified to incorporate current DOE facility design requirements and modem remote maintenance principles. The current regulatory and safety environment has affected the design of the fuel fabrication equipment, most of which will be described in greater detail in subsequent papers in this session

  15. Video equipment of tele dosimetry and audio

    International Nuclear Information System (INIS)

    Ojeda R, M.A.; Padilla C, I.

    2007-01-01

    To develop a work in an area with high radiation, it requires of a detailed knowledge of the surroundings work, a communication and effective vision, a near dosimetric control. In a work where the spaces variables and reduced accesses exist, noise that hinders the communication, defendant operative condition, radiation field and taking of decision, it is necessary to have tools that allow a total control of the environment to make opportune and effective decisions, there where the task is developed. Under this elementary concept, it was developed in the Laguna Verde Central a project that it allowed a mechanism, interactive of control in spaces complex; to see, to hear, to speak, to measure. This concept takes to the creation of an equipped system with closed circuit of television, wireless communication systems, tele dosimetry wireless systems, VHS and DVD recording equipment, uninterrupted energy units. The system requires of an electric power socket, and the installation of two cables by CCTV camera. The system is mobilized by a person. He puts on in operation in 5 minutes using a verification list. The concept was developed in the project denominated VETA-1, (Video Equipment of Tele dosimetry and Audio). It is objective of this work to present before the society the development of the VETA-1 tool that conclude in their first prototype in May of the present year. The VETA-1 project arises by a necessity of optimizing dose, it is an ALARA tool, with a countless applications, like it was proven in the 12 recharge stop of the Unit 1. The VETA-1 project integrate a recording system, with the primary end of analyzing in the place where the task is developed the details for an effective and opportune decision, but the resulting information is of utility for the personnel's training and the planning of future works. The VETA-1 system is an ALARA tool of quick response control. (Author)

  16. 34 CFR 76.661 - Equipment and supplies.

    Science.gov (United States)

    2010-07-01

    ... by the State and Its Subgrantees? Participation of Students Enrolled in Private Schools § 76.661... continuing administrative control of all equipment and supplies that the subgrantee acquires with program... in a private school for the period of time needed for the project. (c) The subgrantee shall insure...

  17. Analysis of QA audit checklist for equipment suppliers

    International Nuclear Information System (INIS)

    Tian Xuehang

    2012-01-01

    Eleven aspects during the equipment manufacturing by the suppliers, including the guidelines and objectives of quality assurance, management department review, document and record control, staffing and training, design control, procurement control, control of items, process control, inspection and testing control, non-conformance control, and internal and external QA audit, are analyzed in this article. The detailed QA audit checklist on these above mentioned aspects are described and the problems found in real QA audit are listed in this article. (authors)

  18. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  19. Trilateral Initiative: IAEA authentication and national certification of verification equipment for facilities with classified forms of fissile material

    International Nuclear Information System (INIS)

    Haas, Eckard; Sukhanov, Alexander; Murphy, John

    2001-01-01

    Full text: Within the framework of the Trilateral Initiative, technical challenges have arisen due to the potential of the International Atomic Energy Agency (IAEA) monitoring fissile material with classified characteristics, as well as the IAEA using facility or host country supplied monitoring equipment. In monitoring material with classified characteristics, it is recognized that the host country needs to assure that classified information is not made available to the IAEA inspectors. Thus, any monitoring equipment used to monitor material with classified characteristics has to contain information security capabilities, such as information barriers. But likewise in using host-country-supplied monitoring equipment, regarding the material being monitored the IAEA has to have confidence that the information provided by the equipment is genuine and can be used by the IAEA in fulfilling its obligation to derive conclusions based on independent verification measures. Thus the IAEA needs to go through the process of authenticating the monitoring equipment. In the same way the host country needs to go through the process to assure itself that the monitoring equipment integrated with an information barrier will not divulge any classified information about an inspected sensitive item. Both processes require on large extent identical measures, but partially also may conflict with each other. The fact that monitoring equipment needs to exhibit information security throughout its lifecycle while at the same time be capable of being authenticated necessitates the need for creative technical approaches to be pursued. (author)

  20. Performance characterization of night vision equipment based on Triangle Orientation Discrimination (TOD) methodology

    NARCIS (Netherlands)

    Laurent, N.; Lejard, C.; Deltel, G.; Bijl, P.

    2013-01-01

    Night vision equipment is crucial in order to accomplish supremacy and safety of the troops on the battlefield. Evidently, system integrators, MODs and end-users need access to reliable quantitative characterization of the expected field performance when using night vision equipment. The Image

  1. Evaluating the Effectiveness and the Impact of Donated Neurosurgical Equipment on Neurosurgical Units in Low- and Middle-Income Countries: The World Federation of Neurosurgical Societies Experience.

    Science.gov (United States)

    Venturini, Sara; Park, Kee B

    2018-01-01

    Surgical practice highly depends on the availability of surgical equipment; this is particularly relevant to low- and middle-income countries (LMICs), where resources are limited. A key part of the efforts to improve surgical provision globally include providing affordable equipment to LMICs; however, the effectiveness and the impact of these initiatives have not yet been assessed. We aimed to evaluate the World Federation of Neurosurgical Societies neurosurgical equipment program in this context. Recipients were identified from the World Federation of Neurosurgical Societies records; contact details were gathered. An online survey was used to collect data on equipment, including its current use, any malfunctioning issues, suitability, reliability, serviceability, and the impact it has had on the unit. Responses were received from 16 units, totaling 28 pieces of equipment. A total of 75% of the equipment is still in use; of this, 57% is fully functioning, and 43% is used despite some malfunction. We found that 25% of the equipment is broken and unusable; high-maintenance items, such as high-speed drills, feature in this category (100% broken, n = 3). Units reported an increase in number of operation performed in 74% cases, improved surgery quality in 78%, and breadth of operations in 44%. Satisfaction, equipment suitability, reliability, and serviceability scored highly, with median values of 9 for all fields on a 10-point scale. Equipment donation positively impacts neurosurgical units in LMICs by allowing expansion of neurosurgical practice, improved safety and quality, and affordability. Adequate follow-up, considerations regarding equipment durability and maintenance needs, and improved support for repairs should be prioritized to ensure maximal benefit. Copyright © 2017 Elsevier Inc. All rights reserved.

  2. Spent fuel storage process equipment development

    International Nuclear Information System (INIS)

    Park, Hyun Soo; Lee, Jae Sol; Yoo, Jae Hyung

    1990-02-01

    Nuclear energy which is a major energy source of national energy supply entails spent fuels. Spent fuels which are high level radioactive meterials, are tricky to manage and need high technology. The objectives of this study are to establish and develop key elements of spent fuel management technologies: handling equipment and maintenance, process automation technology, colling system, and cleanup system. (author)

  3. Margins related to equipment design

    International Nuclear Information System (INIS)

    Devos, J.

    1994-01-01

    Safety margins related to design of reactor equipment are defined according to safety regulations. Advanced best estimate methods are proposed including some examples which were computed and compared to experimental results. Best estimate methods require greater computation effort and more material data but give better variable accuracy and need careful experimental validation. Simplified methods compared to the previous are less sensitive to material data, sometimes are more accurate but very long to elaborate

  4. Guidelines for evaluation of anchorage adequacy for safety-related equipment typically used on WWER-type NPPs

    International Nuclear Information System (INIS)

    Masopust, R.

    1999-01-01

    This report describes the criteria which should be met when the capacity evaluation of anchorage of safety related equipment is performed for the WWER type NPPs. It should be noted that these criteria were developed specifically for anchorage of WWER type equipment and components to the concrete or steel building structures and they cover different types of anchor bolts and other anchorage details which are typical just for the existing, constructed or reconstructed WWER type NPPs. The screening approach for verifying of equipment anchorage presented in this report is based on a combination of inspections, calculations, and engineering judgement

  5. Different types of superconductors: their effect on equipment design

    International Nuclear Information System (INIS)

    Ansart, A.; Manuel, P.; Fevrier, A.

    1989-01-01

    Development of superconductors for AC current and of higher critical temperature superconducting materials enlarged the field of research in cryoelectrotechnic. The paper discusses the materials characteristics in relation with the functional needs in the equipments. Are reviewed the main points governing conductor design for a given application, the characteristics and manufacturing technics for different superconducting materials. It is shown how lighter, smaller equipments can be designed as well as new ones for functions not covered with present apparatus. 17 refs [fr

  6. Interfacing the septa movement (DC motor) equipment to the PS control system and the MIL1553 bus

    CERN Document Server

    Dehavay, Claude

    1993-01-01

    Continuing the rejuvenation of the PS Control system , it is planned to replace the Single Transceiver Hybrid used to interface the Septa Movement Equipment by a G64 system connected to the VME crate via the MIL1553 bus. This note explains the G64 hardware interface and details the standard message as defined in the Control Protocole for Power Converter, RF and Stepping Motor equipment.

  7. AIChe equipment testing procedure centrifugal compressors : a guide to performance evaluation and site testing

    CERN Document Server

    AIChE

    2013-01-01

    With its engineer-tested procedures and thorough explanations, Centrifugal Compressors is an essential text for anyone engaged in implementing new technology in equipment design, identifying process problems, and optimizing equipment performance.  This condensed book presents a step by step approach to preparing for, planning, executing, and analyzing tests of centrifugal compressors, with an emphasis on methods that can be conducted on-site and with an acknowledgement of the strengths and limitations of these methods. The book opens with an extensive and detailed section offering definitions

  8. Advances in impact resistance testing for explosion-proof electrical equipment

    Directory of Open Access Journals (Sweden)

    Pasculescu Vlad Mihai

    2017-01-01

    Full Text Available The design, construction and exploitation of electrical equipment intended to be used in potentially explosive atmospheres presents a series of difficulties. Therefore, the approach of these phases requires special attention concerning technical, financial and occupational health and safety aspects. In order for them not to generate an ignition source for the explosive atmosphere, such equipment have to be subjected to a series of type tests aiming to decrease the explosion risk in technological installations which operate in potentially explosive atmospheres. Explosion protection being a concern of researchers and authorities worldwide, testing and certification of explosion-proof electrical equipment, required for their conformity assessment, are extremely important, taking into account the unexpected explosion hazard due to potentially explosive atmospheres, risk which has to be minimized in order to ensure the occupational health and safety of workers, for preventing material losses and for decreasing the environmental pollution. Besides others, one of the type tests, which shall be applied, for explosion-proof electrical equipment is the impact resistance test, described in detail in EN 60079 which specifies the general requirements for construction, testing and marking of electrical equipment and Ex components intended for use in explosive atmospheres. This paper presents an analysis on the requirements of the impact resistance test for explosion-proof electrical equipment and on the possibilities to improve this type of test, by making use of modern computer simulation tools based on finite element analysis, techniques which are widely used nowadays in the industry and for research purposes.

  9. Outline of new extra high voltage research equipment at Kumatori research laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Hohki, S; Ikeda, G

    1965-01-01

    Following up the construction in 1939 of an ehv research laboratory, another new research laboratory was established at Kumatori with a ground area of 142,000 square meters. As the first stage of this construction plan, the new research equipment was installed in November 1963 and began operation. The laboratory consists of comprehensive ehv research equipment and facilities relating to atomic energy. The former includes a 6000-kV impulse voltage generator, a 1650-kV alternating current testing transformer, a 300-m overhead transmission test line, a tower strength testing facility, and other various high-power test facilities. Studies on a 400- to 500-kV overhead power transmission system and other new transmission systems are currently being conducted. The details of the construction of the ehv research equipment together with the research policy for future ehv engineering are given.

  10. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  11. Standard guide for hot cell specialized support equipment and tools

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 Intent: 1.1.1 This guide presents practices and guidelines for the design and implementation of equipment and tools to assist assembly, disassembly, alignment, fastening, maintenance, or general handling of equipment in a hot cell. Operating in a remote hot cell environment significantly increases the difficulty and time required to perform a task compared to completing a similar task directly by hand. Successful specialized support equipment and tools minimize the required effort, reduce risks, and increase operating efficiencies. 1.2 Applicability: 1.2.1 This guide may apply to the design of specialized support equipment and tools anywhere it is remotely operated, maintained, and viewed through shielding windows or by other remote viewing systems. 1.2.2 Consideration should be given to the need for specialized support equipment and tools early in the design process. 1.2.3 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conv...

  12. Behavioural Motives of Acquisition of Solar-driven Equipment

    Directory of Open Access Journals (Sweden)

    Shkurupska Iryna O.

    2013-12-01

    Full Text Available The article identifies needs of the target group, namely structure of motives, which justify making a decision to buy, in order to create efficient marketing strategy of an enterprise, which sell solar-driven equipment in Ukraine. There are five segments in the domestic market of helio-systems: individual consumers, recreation industry, agrarian industry, construction and social spheres. The article allocates 15 motives of acquisition of the solar-driven equipment for these segments, the most important of which are price, availability of solar energy, alternative price and energy saving. Besides, the structure of such motives is determined for each segment individually. In order to choose specific marketing instruments in the policy of promotion of solar-driven equipment, the article identifies differences in the form of goals of use and motives of acquisition between the specified consumer segments. The article reveals certain barriers that interfere with acquisition of solar-driven equipment – low level of trust into helio-systems, conservatism of consumers, absence of free applications for consumers – overcoming which is only possible with the help of certain marketing actions.

  13. Choice and maintenance of equipment for electron crystallography.

    Science.gov (United States)

    Mills, Deryck J; Vonck, Janet

    2013-01-01

    The choice of equipment for an electron crystallography laboratory will ultimately be determined by the available budget; nevertheless, the ideal lab will have two electron microscopes: a dedicated 300 kV cryo-EM with a field emission gun and a smaller LaB(6) machine for screening. The high-end machine should be equipped with photographic film or a very large CCD or CMOS camera for 2D crystal data collection; the screening microscope needs a mid-size CCD for rapid evaluation of crystal samples. The microscope room installations should provide adequate space and a special environment that puts no restrictions on the collection of high-resolution data. Equipment for specimen preparation includes a carbon coater, glow discharge unit, light microscope, plunge freezer, and liquid nitrogen containers and storage dewars. When photographic film is to be used, additional requirements are a film desiccator, dark room, optical diffractometer, and a film scanner. Having the electron microscopes and ancillary equipment well maintained and always in optimum condition facilitates the production of high-quality data.

  14. 29 CFR 1910.334 - Use of equipment.

    Science.gov (United States)

    2010-07-01

    ... remain connected once they are put in place and are not exposed to damage need not be visually inspected... until repairs and tests necessary to render the equipment safe have been made. (iii) When an attachment... grounding conductor. (ii) Attachment plugs and receptacles may not be connected or altered in a manner which...

  15. E-detailing: information technology applied to pharmaceutical detailing.

    Science.gov (United States)

    Montoya, Isaac D

    2008-11-01

    E-detailing can be best described as the use of information technology in the field of pharmaceutical detailing. It is becoming highly popular among pharmaceutical companies because it maximizes the time of the sales force, cuts down the cost of detailing and increases physician prescribing. Thus, the application of information technology is proving to be beneficial to both physicians and pharmaceutical companies. When e-detailing was introduced in 1996, it was limited to the US; however, numerous other countries soon adopted this novel approach to detailing and now it is popular in many developed nations. The objective of this paper is to demonstrate the rapid growth of e-detailing in the field of pharmaceutical marketing. A review of e-detailing literature was conducted in addition to personal conversations with physicians. E-detailing has the potential to reduce marketing costs, increase accessibility to physicians and offer many of the advantages of face-to-face detailing. E-detailing is gaining acceptance among physicians because they can access the information of a pharmaceutical product at their own time and convenience. However, the drug safety aspect of e-detailing has not been examined and e-detailing remains a supplement to traditional detailing and is not yet a replacement to it.

  16. Investigation of possible methods for equipment self-tests in digital radiology

    International Nuclear Information System (INIS)

    Zoetelief, J.; Idris, H. H. E.; Jansen, J. T. M.

    2005-01-01

    Quality control in digital radiology can be time-consuming. Equipment self-tests may significantly decrease staff workload. The two most essential parameters for radiology systems are image quality and patient dose. Concerning patient dose, information on the dose-area product (DAP) values generally forms the basis for assessment of patient dose. DAP-values can be measured using a transmission ionisation chamber or calculated from equipment settings. In the present study, various image quality parameters were derived using a contrast-detail (C-D) phantom. The investigation included a computer-aided assessment of C-D images, which produced various parameters, and also parameters based upon scoring by human observers. In addition, another parameter was calculated from modulation transfer function (MTF) measurements. The automatically calculated parameters showed good correlation with human readings, although the number of X-ray systems studied is still limited. We propose a combined evaluation of DAP and automatically calculated C-D or MTF parameters for equipment self-tests. (authors)

  17. Recommended safety procedures for the selection, installation and use of baggage inspection x-ray equipment

    International Nuclear Information System (INIS)

    1978-05-01

    Good X-ray equipment alone will not preclude unnecessary exposure to x-radiation. The equipment must be installed, maintained and used by adequately trained personnel, with due regard for the inherent hazards of such equipment and an appreciation of the need to observe proper operational procedures. It is the intent of this Code to define equipment specifications and conditions of installation and use for baggage inspection X-ray equipment, such that the hazard to operating personnel and the general public from such devices remains negligibly small. (auth)

  18. Comprehensive framework for preventive maintenance priority of medical equipment.

    Science.gov (United States)

    Saleh, Neven; Balestra, Gabriella

    2015-08-01

    Throughout the medical equipment life cycle, preventive maintenance is considered one of the most important stages that should be managed properly. However, the need for better management and control by giving a reasonable prioritization for preventive maintenance becomes essential. The purpose of this study is to develop a comprehensive framework for preventive maintenance priority of medical equipment using Quality Function Deployment (QFD) and Fuzzy Logic (FL). The quality function deployment is proposed in order to identify the most important criteria that could impact preventive maintenance priority decision; meanwhile the role of the fuzzy logic is to generate a priority index of the list of equipment considering those criteria. The model validation was carried out on 140 pieces of medical equipment belonging to two hospitals. In application, we propose to classify the priority index into five classes. The results indicate that the strong correlation existence between risk-based criteria and preventive maintenance priority decision.

  19. A Content Analysis of Officer Perceptions of Detailing.

    Science.gov (United States)

    1981-03-01

    answer was "No Way"! Told me needs of service were in Philippine Island CNSG WESTPAC as OPS, three year tour. I wrote letter saying O.K. Was detailed as...off to them as it has to be least preferred of all tasks...personnel detailer. 2 I regret the tardiness of this reply - New Zealand is a long way

  20. Implications of NUREG-1150 for equipment qualification

    International Nuclear Information System (INIS)

    Siu, R.P.; Sarram, M.

    1988-01-01

    Current USNRC regulations in 10CFR50 requires that structures, systems and components important to safety in a nuclear power plant are to be designed to accommodate the effects of harsh environments associated with potential accidents. Detailed regulatory requirements are as discussed in Regulatory Guide 1.89. Some of these regulatory requirements have been based upon rather outdated understanding of the phenomenology of severe accidents -- e.g., the radiation source terms for equipment qualification can be traced to TID-14844 which was originally published in 1962. Furthermore, the definition of important-to-safety in these regulatory requirements is rather broad, usually resulting in a long Q-list of equipment to be qualified for the design-basis Large LOCA. In the past few years, extensive research/analysis on severe accidents have been conducted -- from the IREP/NREP activities, the IDCOR programs, to the NUREG-1150 efforts. This paper reports that as a result of all these PRA-related activities, a much-improved understanding of the phenomenology and environmental conditions associated with severe accidents has been gained

  1. Current trends in small vocabulary speech recognition for equipment control

    Science.gov (United States)

    Doukas, Nikolaos; Bardis, Nikolaos G.

    2017-09-01

    Speech recognition systems allow human - machine communication to acquire an intuitive nature that approaches the simplicity of inter - human communication. Small vocabulary speech recognition is a subset of the overall speech recognition problem, where only a small number of words need to be recognized. Speaker independent small vocabulary recognition can find significant applications in field equipment used by military personnel. Such equipment may typically be controlled by a small number of commands that need to be given quickly and accurately, under conditions where delicate manual operations are difficult to achieve. This type of application could hence significantly benefit by the use of robust voice operated control components, as they would facilitate the interaction with their users and render it much more reliable in times of crisis. This paper presents current challenges involved in attaining efficient and robust small vocabulary speech recognition. These challenges concern feature selection, classification techniques, speaker diversity and noise effects. A state machine approach is presented that facilitates the voice guidance of different equipment in a variety of situations.

  2. Response of equipment to aircraft impact

    International Nuclear Information System (INIS)

    Wolf, J.P.; Bucher, K.M.; Skrikerud, P.E.

    1977-01-01

    The loading case of an aircraft crashing onto certain safety-relevant buildings of a nuclear-power plant has recently become, in certain countries, as important as that of the safe-shutdown earthquake. Although its probability of occurrence is substantially smaller than that of the SSE, the analysis is justified as an aircraft can also be regarded as representative of other shock loading cases. For the purpose of design it is convenient to distinguish between the response of the actual structure and that of the equipment. The former, which consists of global stress resultants and of local effects such as spalling, scabbing, penetration and perforation of the concrete of the structure, is quite well understood and is not examined in this paper. The latter, caused by propagating shock waves, has, rather surprisingly, received little attention, although, for earthquake excitation, the analysis of equipment is routinely performed. The high accelerations experienced by the equipment are calculated and the corresponding floor-response spectra show that the airplane crash is dominant in the high-frequency range, when compared to the effect of earthquakes. As the aircraft impacts on a small area of the structure only, and the corresponding function of the load versus time exhibits a substantial content of high frequency, the modelling of the structure has to be rather detailed. Several thousand dynamic degrees of freedom in a finite-element idealization result, when analyzing e.g. a typical reactor auxiliary building, the familiar lumped-beam models used successfully for earthquake analysis can obviously not be chosen. (Auth.)

  3. Special audit report on the Department of Energy`s Arms and military-type equipment

    Energy Technology Data Exchange (ETDEWEB)

    Layton, J.C.

    1996-02-01

    Based on the activities associated with the recent recovery of the eight armored personnel carriers, a review was conducted of the Department`s controls over arms and military-type equipment in its possession. The objects were to determine whether (1) the quantity of arms and military-type equipment on hand was justified by mission needs, (2) inventory listings of arms were accurate, (3) property disposals were properly controlled and executed, and (4) loans and borrowed equipment were appropriate and accounted for accurately. The purpose of this report is to summarize the most significant issues identified and point out where the Department needs stronger controls over its inventory of arms and military-type property.

  4. 45 CFR 1304.53 - Facilities, materials, and equipment.

    Science.gov (United States)

    2010-10-01

    ... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND... development of each child. (2) Grantee and delegate agencies must provide appropriate space for the conduct of... meet the needs and facilitate the participation of children and adults. Equipment, toys, materials, and...

  5. Efficiency improvement of technological preparation of power equipment manufacturing

    Science.gov (United States)

    Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.

    2017-11-01

    Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.

  6. Seizing market shaping opportunities for vaccine cold chain equipment.

    Science.gov (United States)

    Azimi, Tara; Franzel, Lauren; Probst, Nina

    2017-04-19

    Gavi, the Vaccine Alliance, supports immunisation programmes in eligible countries to reach children with lifesaving vaccines. Dramatic improvement in the scale and performance of current cold chain systems is required to extend the reach of immunisation services - especially for children living in remote locations - to advance progress towards full vaccine coverage. Achieving these improvements will require a healthier market for cold chain equipment where the products meet user needs, are sustainably priced, and are available in sufficient quantities to meet demand. Yet evidence suggests that the cold chain market has suffered from several failures including limited demand visibility, fragmented procurement, and insufficient information exchange between manufacturers and buyers on needs and equipment performance. One of Gavi's strategic goals is to shape markets for vaccines and other immunisation products, including cold chain equipment and in 2015, Gavi created a new mechanism - the Cold Chain Equipment (CCE) Optimisation Platform - to strengthen country cold chain systems by offering financial support and incentives for higher performing CCE. The main objective of the CCE Platform is to get more equipment that is efficient, sustainable, and better performing deployed to every health facility where it is required at an affordable price. To achieve these objectives, Gavi is putting in place tested market shaping approaches and tools adapted for the CCE market: the development of market strategies or 'roadmaps'; improvement of product performance through the development of target product profiles (TPPs); strategic engagement with CCE manufacturers and countries to enhance information sharing; and tailoring procurement tactics to the CCE market. These approaches and tools will allow for increased demand and supply of higher-performing, cost-effective and quality products. By strengthening immunisation systems with improved cold chain equipment, Gavi countries can

  7. Status of Equipment Development for a High-Level Waste Repository in Germany

    International Nuclear Information System (INIS)

    Biurrun, E.; Haverkamp, B.; Filbert, W.; Bollingerfehr, W.; Graf, R.

    2009-01-01

    In Germany, a potential site for a deep geological repository mainly for heat generating high-level waste was selected back on February 22, 1977: a salt dome located near the village of Gorleben, at the shores of the Elbe River in Northern Germany. Concurrent with site exploration from the surface, and later exploration mine construction, a large-scale R and D effort was conducted to have the science and technology needed to license and later operate a repository available when needed. An important part of these efforts was the development and 1:1 scale demonstration of all technologies required to run a repository, which had not been state-of-the-art. Underground exploration of the Gorleben site has come to a moratorium due to political decisions taken by the former Federal Government formed by a coalition between the Social Democrats and the Green Party back in 2000. However, research and development in regard to emplacement techniques and equipment has continued. This paper reflects the consistent, long-term technological effort that has led to having available all advanced technologies required to run a repository for spent fuel and HLW. The paper details previous achievements and points at present optimization work. (authors)

  8. Acquired image quality in digital industrial radiographic equipments

    International Nuclear Information System (INIS)

    Oliveira, Cristiane de Queiroz; Lopes, Ricardo Tadeu; Oliveira, Davi F.

    2008-01-01

    The computerized radiographic application in the industrial area is a recent event. The imaging plate is the equipment used as imaging receiver during the exposition radiographic technique, which consists of a flexible photostimulable phosphor screen, capable of storing the photons energy of the incident X and γ rays and of a reading unit which uses a laser device to stimulate a visible light. As two types of phosphor screen are manufactured, one for general use (General Plate - GP) and another one for specific using (High Resolution-HR), one of the objectives of this study was to evaluate the spatial resolution capability in both plates using the Kodak equipment. Furthermore, equipment from different makers, Kodak and General Electric Company - GE, were compared. Two phosphor screen HR were used as the main objective of this study. Imaging Quality Indicators - IQI were used to evaluate the spatial resolution of the images in accordance with ASME and DIN standard. The results show that after evaluating the GP and HR Kodak plates, the HR plate was capable of showing a larger resolution of details. However, after evaluating the performance of the HR Kodak plate and GE plate, over the same acquisition condition and with the same size of the laser focal set of 87 μm, the results show a superiority in the GE equipment used for industrial radiographic, mainly for processed images in each specific ambient of digital processing and its performance in meeting satisfactorily the ASME code and the DIN standard. (author)

  9. Operability test procedure [Tank] 241-SY-101 equipment removal system

    International Nuclear Information System (INIS)

    Mast, J.C.

    1994-01-01

    The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation

  10. The Preliminary Prototype of Medium Dose Rate Brachytherapy Equipment

    Directory of Open Access Journals (Sweden)

    A. Satmoko

    2013-08-01

    Full Text Available A preliminary prototype of a brachytherapy equipment has been constructed. The work started by developing conceptual design, followed by basic design and detailed design. In the conceptual design, design requirements are stated. In the basic design, technical specifications for main components are determined. In detailed design, general drawings are discussed. The prototype consists of three main systems: a mechanical system, an instrumentation system, and a safety system. The mechanical system assures the movement mechanism of the isotope source position beginning from the standby position until the applicators. It consists of three main modules: a position handling module, a container module, and a channel distribution module. The position handling module serves to move the isotope source position. As shielding, the second module is to store the source when the equipment is in standby position. The prototype provides 12 output channels. The channel selection is performed by the third module. The instrumentation system controls the movement of source position by handling motor operations. It consists of several modules. A microcontroller module serves as a control center whose task includes both controlling motors and communicating with computer. A motor module serves to handle motors. 10 sensors, including their signal conditionings, are introduced to read the environment conditions of the equipment. LEDs are used to display these conditions. In order to facilitate the operators’ duty, communication via RS232 is provided. The brachytherapy equipment can therefore be operated by using computer. Interface software is developed using C# language. To complete both mechanical and instrumentation systems performance, a safety system is developed to make sure that the safety for operator and patients from receiving excessive radiation. An interlock system is introduced to guard against abnormal conditions. In the worst case, a manual intervention

  11. Development of support system for maintenance and administration of reprocessing plant equipment

    International Nuclear Information System (INIS)

    Iwasaki, Syogo; Taniguchi, Takayuki; Shiraishi, Yoshihiko; Isaka, Kazuo

    1998-01-01

    Each year, maintenance work is carried out for about 10,000 pieces of equipment, including mechanical devices, electric equipment and instruments, at the Tokai Reprocessing Plant. Ninety percent of such maintenance work is preventive maintenance. In order to manage the information about the maintenance work, a computer support system was developed between 1985 and 1992. Twenty-seven thousand pieces of equipment and 180,000 maintenance histories have already been registered in the system. The system has been used for planning inspections and replacement of equipment as well as checking their maintenance histories. Actual usage of the system has shown that some auxiliary functions need to be added. The system will therefore be improved and extended. (author)

  12. Plant equipment services with laser metrology

    International Nuclear Information System (INIS)

    Hayes, J.H.; Kreitman, P.J.

    1995-01-01

    A new industrial metrology process is now being applied to support PWR Nuclear Plant Steam Generator Replacement Projects. The method uses laser tracking interferometry to perform as built surveys of existing and replacement plant equipment. This method provides precision data with a minimum of setup when compared to alternative methods available. In addition there is no post processing required to ascertain validity. The data is obtained quickly, processed in real time and displayed during the survey in the desired coordinate system. These capabilities make this method of industrial measure ideal for various data acquisition needs throughout the power industry, from internal/external equipment templating to area mapping. Laser tracking interferometry is an improvement on the present use of optical instruments and surveying technique. In order to describe the laser tracking interferometry measurement process, previous methods of templating and surveying are first reviewed

  13. Nuclear equipment recalsification based on the service experience

    International Nuclear Information System (INIS)

    Geambasu, A.; Segarceanu, D.

    2000-01-01

    The paper presents some considerations concerning the need of comparison between equipment performance proven by test and the service experience in Cernavoda Nuclear Plant. Service performance dana obtain partly from service failures (failures times) and partly from service experience without failure (running times) can be statistically analyzed to obtain predictions of the number of failures of unfailed units in specified period of time, means time to first failure, means time of median failure, a.s.o. These informations can be used during the operation of Nuclear Power Plant to estimate when a equipment should be replaced with a new one in order to prevent getting to the life end point. (author)

  14. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  15. Inquiry about the uses of special equipment (CT equipment, angiography systems, mammography devices, screens)

    International Nuclear Information System (INIS)

    Schwager, P.; Stieve, F.E.

    1986-01-01

    There are at least 1100 special devices in medical establishment in Bavaria which require special inspection and surveillance with regard to quality of equipment and radiation protection. In addition, there are at least 53 tomographs available for operation, and at least 120 installed X-ray screens. These devices need special approval testing and quality control services as they contribute a very significant amount of the medically indicated radiation exposure of the population. Appropriate measures are explained that can be applied in order to reduce the medical radiation exposure to an optimum. (orig.) [de

  16. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  17. Operational planning optimization of steam power plants considering equipment failure in petrochemical complex

    International Nuclear Information System (INIS)

    Luo, Xianglong; Zhang, Bingjian; Chen, Ying; Mo, Songping

    2013-01-01

    Highlights: ► We develop a systematic programming methodology to address equipment failure. ► We classify different operation conditions into real periods and virtual periods. ► The formulated MILP models guarantee cost reduction and enough operation safety. ► The consideration of reserving operation redundancy is effective. - Abstract: One or more interconnected steam power plants (SPPs) are constructed in a petrochemical complex to supply utility energy to the process. To avoid large economic penalties or process shutdowns, these SPPs should be flexible and reliable enough to meet the process energy requirement under varying conditions. Unexpected utility equipment failure is inevitable and difficult to be predicted. Most of the conventional methods are based on the assumption that SPPs do not experience any kind of equipment failure. Unfortunately, a process shutdown cannot be avoided when equipment fails unexpectedly. In this paper, a systematic methodology is presented to minimize the total cost under normal conditions while reserving enough flexibility and safety for unexpected equipment failure conditions. The proposed method transforms the different conditions into real periods to indicate normal scenarios and virtual periods to indicate unexpected equipment failure scenarios. The optimization strategy incorporating various operation redundancy scheduling, the transition constraints from equipment failure conditions to normal conditions, and the boiler load increase behavior modeling are presented to save cost and guarantee operation safety. A detailed industrial case study shows that the proposed systematic methodology is effective and practical in coping with equipment failure conditions with only few additional cost penalties

  18. Investigation of nanoeffect on wear of details and ties of oilfield devices

    International Nuclear Information System (INIS)

    Shahbazov, E.G.; Shafiyev, Sh.Sh.

    2010-01-01

    The investigations have been carried out at SOCAR on the study of nanoparticles effect on the corrosion of metallic surfaces. It was defined that corrosion rate decreases as a result.It is stated in the article that nanotechnology applications have prospects for protection of details and ties of oilfield equipment. It is necessary to work out special programs for this case. The authors had an attempt to form the main aspects of such programs.

  19. MAESTRO: Methods and Advanced Equipment for Simulation and Treatment in Radio-Oncology

    Science.gov (United States)

    Barthe, Jean; Hugon, Régis; Nicolai, Jean Philippe

    2007-12-01

    The integrated project MAESTRO (Methods and Advanced Equipment for Simulation and Treatment in Radio-Oncology) under contract with the European Commission in life sciences FP6 (LSHC-CT-2004-503564), concerns innovative research to develop and validate in clinical conditions, advanced methods and equipment needed in cancer treatment for new modalities in high-conformal external radiotherapy using electrons, photons and protons beams of high energy.

  20. Repository Planning, Design, and Engineering: Part II-Equipment and Costing.

    Science.gov (United States)

    Baird, Phillip M; Gunter, Elaine W

    2016-08-01

    Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.

  1. An equipment for the dimensional characterization of irradiated fuel channels

    International Nuclear Information System (INIS)

    Cederquist, H.

    1985-01-01

    The reuse of irradiated fuel channels in BWRs is highly beneficial. However, one prerequisite for reuse of a fuel channel is the detailed knowledge of its dimensions, which are affected by irradiation and pressure drop during operation. Therefore an equipment for fast and accurate dimensional measurement of irradiated fuel channels has been developed. The measurements are carried out when the fuel assembly is supported in the same manner as in the reactor core. The equipment utilizes stationary ultrasonic transducers that measure the fuel channel at a number of predetermined axial levels. Measurement data are fed into a computer which calculates the requested dimensional characteristics such as transversal flatness, bow, twist, side perpendicularity etc. Data are automatically printed for subsequent evaluation. Measurements can be performed both when the fuel channel is placed on a fuel bundle and on an empty fuel channel

  2. Survey on requirements for independent reviews and inspections of electrical and I and C equipment

    Energy Technology Data Exchange (ETDEWEB)

    Byman, Karin; Groenkvist, Stefan; Egerbo, Anders; Nilsson, Thomas (AaF Consult AB, Stockholm (Sweden))

    2009-03-15

    In this survey, licensing procedures for the implementation of different kinds of components and systems in nuclear power plants have been studied in four European countries: Belgium (Finland), Germany, and Switzerland. The main focus has been to describe the general features of the licensing procedures for electrical and for instrumentation and control (IandC) equipment and systems. The regulatory framework for the operation of nuclear power plants in Belgium is based on the American regulations. The licensing procedure for each modification of significance for the safety of a plant is carried out by the authorised inspection organisation (AVN), which follows its own procedures for the review of the modification file, the commissioning, and conformity check of the installation. These procedures are general and independent of the technical domain of the equipment or system and AVN uses the US regulations standard review plan (SRP) as a reference for technical reviews. The Federal Agency for Nuclear Control (FANC) is responsible for the surveillance of all nuclear activities in Belgium, but the private non-profit authorised inspection organisation (AVN) does perform inspections and other regulatory tasks delegated by FANC. Controls of electrical components and systems with regard to the general Belgian electrical regulations are performed by accredited inspection organisations. The regulatory framework for the safety of nuclear activities in Finland is domestic and detailed safety requirements are provided by the Radiation and Nuclear Safety Authority (STUK). They cover specific requirements for the licensing procedure for electrical and IandC equipment. In Finland, there are no general differences in the licensing procedure for electrical, instrumentation, and mechanical equipment and the licensing procedure is basically the same for all types of systems, structures and equipment. STUK has the responsibility for the regulatory control in Finland and may seek

  3. Survey on requirements for independent reviews and inspections of electrical and I and C equipment

    International Nuclear Information System (INIS)

    Byman, Karin; Groenkvist, Stefan; Egerbo, Anders; Nilsson, Thomas

    2009-03-01

    In this survey, licensing procedures for the implementation of different kinds of components and systems in nuclear power plants have been studied in four European countries: Belgium (Finland), Germany, and Switzerland. The main focus has been to describe the general features of the licensing procedures for electrical and for instrumentation and control (IandC) equipment and systems. The regulatory framework for the operation of nuclear power plants in Belgium is based on the American regulations. The licensing procedure for each modification of significance for the safety of a plant is carried out by the authorised inspection organisation (AVN), which follows its own procedures for the review of the modification file, the commissioning, and conformity check of the installation. These procedures are very general and independent of the technical domain of the equipment or system and AVN uses the US regulations standard review plan (SRP) as a reference for technical reviews. The Federal Agency for Nuclear Control (FANC) is responsible for the surveillance of all nuclear activities in Belgium, but the private non-profit authorised inspection organisation (AVN) does perform inspections and other regulatory tasks delegated by FANC. Controls of electrical components and systems with regard to the general Belgian electrical regulations are performed by accredited inspection organisations. The regulatory framework for the safety of nuclear activities in Finland is domestic and detailed safety requirements are provided by the Radiation and Nuclear Safety Authority (STUK). They cover specific requirements for the licensing procedure for electrical and IandC equipment. In Finland, there are no general differences in the licensing procedure for electrical, instrumentation, and mechanical equipment and the licensing procedure is basically the same for all types of systems, structures and equipment. STUK has the responsibility for the regulatory control in Finland and may seek

  4. Acoustic Camera as a Fool for Identifying Machinery and Equipment Failures

    Directory of Open Access Journals (Sweden)

    Ľudmila Pavlikova

    2018-03-01

    Full Text Available Sound and noise are as old as humanity itself. They have accompanied civilization, evolution, and development for centuries. Music and speech represent not only the key elements of human life but also unpleasant feelings of noise that have always been an integral part of human existence. As industrial development has required more energy, powerful machinery, and equipment, there have been still noisier machines. Traffic has grown quickly due to the number and speed of vehicles. For that reason, an acoustic camera is used for the dynamic visualization of machinery and equipment noise as it analyses the sources of noise in details. Subsequently, qualified measures are introduced based on the results of the analysis. The paper considers launching another application. According to the proposed methodology, its use in identifying machinery and equipment failures and their maintenance is proved. The experiment was performed on a four-wheel lawn mower. The primary focus was on the identification of failures using an acoustic camera. The previous method allowed to quickly, precisely and efficiently identifying the failures in two out of five tested machines.

  5. Laboratory equipment maintenance: a critical bottleneck for strengthening health systems in sub-Saharan Africa?

    Science.gov (United States)

    Fonjungo, Peter N; Kebede, Yenew; Messele, Tsehaynesh; Ayana, Gonfa; Tibesso, Gudeta; Abebe, Almaz; Nkengasong, John N; Kenyon, Thomas

    2012-02-01

    Properly functioning laboratory equipment is a critical component for strengthening health systems in developing countries. The laboratory can be an entry point to improve population health and care of individuals for targeted diseases - prevention, care, and treatment of TB, HIV/AIDS, and malaria, plus maternal and neonatal health - as well as those lacking specific attention and funding. We review the benefits and persistent challenges associated with sustaining laboratory equipment maintenance. We propose equipment management policies as well as a comprehensive equipment maintenance strategy that would involve equipment manufacturers and strengthen local capacity through pre-service training of biomedical engineers. Strong country leadership and commitment are needed to assure development and sustained implementation of policies and strategies for standardization of equipment, and regulation of its procurement, donation, disposal, and replacement.

  6. System Model of Heat and Mass Transfer Process for Mobile Solvent Vapor Phase Drying Equipment

    Directory of Open Access Journals (Sweden)

    Shiwei Zhang

    2014-01-01

    Full Text Available The solvent vapor phase drying process is one of the most important processes during the production and maintenance for large oil-immersed power transformer. In this paper, the working principle, system composition, and technological process of mobile solvent vapor phase drying (MVPD equipment for transformer are introduced in detail. On the basis of necessary simplification and assumption for MVPD equipment and process, a heat and mass transfer mathematical model including 40 mathematical equations is established, which represents completely thermodynamics laws of phase change and transport process of solvent, water, and air in MVPD technological processes and describes in detail the quantitative relationship among important physical quantities such as temperature, pressure, and flux in key equipment units and process. Taking a practical field drying process of 500 KV/750 MVA power transformer as an example, the simulation calculation of a complete technological process is carried out by programming with MATLAB software and some relation curves of key process parameters changing with time are obtained such as body temperature, tank pressure, and water yield. The change trend of theoretical simulation results is very consistent with the actual production record data which verifies the correctness of mathematical model established.

  7. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  8. Personal protective equipment use among students with special health care needs reporting injuries in school-sponsored vocational, career, and technical education programs in New Jersey.

    Science.gov (United States)

    Rubenstein, Eric; Shendell, Derek; Eggert, Brain C; Marcella, Stephen W

    2014-01-01

    Students with special health care needs (SHCNs) and individualized education plans (IEPs) may be injured more often in vocational, career, and technical education (CTE) programs. No research to date considers personal protective equipment (PPE) use among students with SHCNs in school-based programs reporting injuries to agencies. Data from 1999 to 2011 on PPE use among injured students in CTE programs in public schools and private secondary schools for the disabled were analyzed; students with SHCNs were distinguished by IEP status within New Jersey Safe Schools surveilance data. Among students with IEPs using PPE, 36% of injuries occurred to body parts PPE was meant to protect. Likely injury types were cuts-lacerations and burns for students with IEPs using PPE and cuts-lacerations and sprains for students with IEPs not using PPE. Females with IEPs using PPE were injured less often than males across ages. Results suggested students with SHCNs with IEPs need further job-related training with increased emphasis on properly selecting and fitting PPE.

  9. Navigation Tools and Equipment and How They Have Improved Aviation Safety

    OpenAIRE

    Sulaiman D. S Alsahli FadalahassanALfadala

    2017-01-01

    This paper highlights the impact of navigation tools and equipment, such as the GPS, navigation radar, and other communications tools, which aid in ensuring aviation safety. It emphasizes the need for aviation safety and how these navigation methods are of great help to reduce the hazards and clearly indicate the problems related to the aircraft, aircraft traffic management, weather disturbances, among others. It also recommends how these tools and equipment must be further developed to promo...

  10. Activity of the Service for maintenance of the electronic equipment of the RA reactor in 1976, report - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1976-01-01

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system [sr

  11. Energy Efficiency Sector in Russia. Market Survey of Equipment and Services

    International Nuclear Information System (INIS)

    2006-02-01

    The aim of the present Survey is to give an insight of energy efficiency (EE) in Russia and to assess the demand for EE equipment and services in the energy sector. In the Survey the term 'Energy Efficiency' means the efficient generation, distribution and consumption of heat and power. The main EE measures are classified as recovery of sources of energy, measuring and controlling systems, optimal use of the equipment, modernisation, in-house energy generation and renewable energy sources. Chapter 3 gives an overview of the current situation of the Russian energy sector. The term 'energy sector' is used in the context of generation, distribution and consumption of heat and power. The infrastructure and the ownership of the energy sector are examined. In this chapter special attention is paid to the Power Sector Reform and how the Reform affects the development of EE in the Russian energy sector. Chapter 4 describes the current situation in EE, giving the reasons of inefficiency in energy use and possible solutions for improving. Chapter 5 presents a market research of equipment that could make a great input into EE development. The research has shown that the most promising opportunities for suppliers of EE equipment lie in the heat sector (generation, distribution, consumption). This chapter also describes the development of ESCOs (Energy Service Companies) in Russia. Chapter 6 gives an overview of domestic and foreign capital available to finance EE development. According to conventional market based incentives, end users invest into increasing their profits more intensively than into projects aiming at energy saving. That is mostly because energy is relatively cheap in Russia and the federal governmental policy does not stimulate EE development either. Chapter 7 on the market approach advises on steps that have to be taken and risks that need to be avoided in order to enter the Russian market successfully. It warns of the possible pitfalls on this way. Chapter 8

  12. Novel Field Test Equipment for Lithium-Ion Batteries in Hybrid Electrical Vehicle Applications

    Directory of Open Access Journals (Sweden)

    Goran Lindbergh

    2011-04-01

    Full Text Available Lifetime testing of batteries for hybrid-electrical vehicles (HEV is usually performed in the lab, either at the cell, module or battery pack level. Complementary field tests of battery packs in vehicles are also often performed. There are, however, difficulties related to field testing of battery-packs. Some examples are cost issues and the complexity of continuously collecting battery performance data, such as capacity fade and impedance increase. In this paper, a novel field test equipment designed primarily for lithium-ion battery cell testing is presented. This equipment is intended to be used on conventional vehicles, not hybrid vehicles, as a cheaper and faster field testing method for batteries, compared to full scale HEV testing. The equipment emulates an HEV environment for the tested battery cell by using real time vehicle sensor information and the existing starter battery as load and source. In addition to the emulated battery cycling, periodical capacity and pulse testing capability are implemented as well. This paper begins with presenting some background information about hybrid electrical vehicles and describing the limitations with today’s HEV battery testing. Furthermore, the functionality of the test equipment is described in detail and, finally, results from verification of the equipment are presented and discussed.

  13. Radiation protection problems with dental radiological equipment

    International Nuclear Information System (INIS)

    Cooney, P.; Rajan, J.; Malone, J.F.; Gavin, G.

    1995-01-01

    With the advent of the EC Patient Directive, the importance of surveying and optimising patient exposure for diagnostic imaging procedures is paramount. In the field of dentistry there has been a heightened interest in areas of equipment performance and patient exposure. This interest, coupled with a number of dental radiation safety incidents investigated by our department, and the issuing of a Code of Practice for Radiological Protection in Dentistry by the Department of Health, led to the establishment in our department, of an evaluation protocol for the performance and operation of dental X ray equipment. The protocol was used to perform a survey on over 100 dental X ray units in use in the Public Sector in Ireland. This presentation will report on the radiation incidents mentioned above. It will detail the protocol and furnish the results and conclusions of the survey. The survey has made it possible to establish clearly the necessary steps required to ensure compliance with requirements. In addition, the corrective steps taken by the dental authorities will be presented and the overall impact of the regulations and the programme consequent on them will be reviewed. (Author)

  14. Wireless Hybrid Identification and Sensing Platform for Equipment Recovery (WHISPER), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Advanced Systems & Technologies proposed WHISPER (Wireless Hybrid Identification and Sensing Platform for Equipment Recovery) solution to NASA's need for...

  15. Wireless Hybrid Identification and Sensing Platform for Equipment Recovery (WHISPER), Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Advanced Systems & Technologies proposed WHISPER (Wireless Hybrid Identification and Sensing Platform for Equipment Recovery) solution to NASA's need for...

  16. Influences on physicians' adoption of electronic detailing (e-detailing).

    Science.gov (United States)

    Alkhateeb, Fadi M; Doucette, William R

    2009-01-01

    E-detailing means using digital technology: internet, video conferencing and interactive voice response. There are two types of e-detailing: interactive (virtual) and video. Currently, little is known about what factors influence physicians' adoption of e-detailing. The objectives of this study were to test a model of physicians' adoption of e-detailing and to describe physicians using e-detailing. A mail survey was sent to a random sample of 2000 physicians practicing in Iowa. Binomial logistic regression was used to test the model of influences on physician adoption of e-detailing. On the basis of Rogers' model of adoption, the independent variables included relative advantage, compatibility, complexity, peer influence, attitudes, years in practice, presence of restrictive access to traditional detailing, type of specialty, academic affiliation, type of practice setting and control variables. A total of 671 responses were received giving a response rate of 34.7%. A total of 141 physicians (21.0%) reported using of e-detailing. The overall adoption model for using either type of e-detailing was found to be significant. Relative advantage, peer influence, attitudes, type of specialty, presence of restrictive access and years of practice had significant influences on physician adoption of e-detailing. The model of adoption of innovation is useful to explain physicians' adoption of e-detailing.

  17. Safety code 19: recommended safety procedures for the selection, installation and use of x-ray diffraction equipment

    International Nuclear Information System (INIS)

    1984-01-01

    This document is one of a series of Safety Codes prepared by the Radiation Protection Bureau to set out requirements for the safe use of radiation emitting devices. The equipment and installation guidelines and safety procedures detailed in this Code are primarily for the instruction and guidance of persons employed in Federal Public Service Departments and Agencies, as well as those coming under the jurisdiction of the Canada Labour Code. This Safety Code is also intended to assist other users of X-ray diffraction equipment to select safe equipment and to install and use it so that the radiation hazard to the operator and other persons in its vicinity is negligible. It should be noted that facilities under provincial jurisdiction may be subject to requirements specified under provincial statutes. This Code supersedes Safety Code RPD-SC-7, entitled 'Requirements For Non-Medical X-Ray Equipment, Use and Installation', insofar as X-ray diffraction equipment is concerned, and it is intended to complement X-ray equipment design, construction and performance standards promulgated under the Radiation Emitting Devices Act

  18. Developing ''SMART'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; SpencerR, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of: (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased finding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the ''Smart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations''. This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABB CENP), Sandia National Laboratories, Duke Engineering and Services (DE and S), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of smart equipment and predictive maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the Smart Equipment program will: (1) Identify and prioritize nuclear plant equipment that would most likely benefit from adding smart features; (2) Develop a methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i.e. smart equipment); (3) Develop a methodology to provide plant operators with real-time information through smart equipment Man-Machine Interfaces (MMI) to support their decision making; (4) Demonstrate the methodology on a targeted component and/or system; (5) Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed subtask

  19. Safety research needs for Russian-designed reactors

    International Nuclear Information System (INIS)

    1998-01-01

    In June 1995, an OECD Support Group was set up to perform a broad study of the safety research needs of Russian-designed reactors. This Support Group was endorsed by the CSNI. The Support Group, which is composed of senior experts on safety research from several OECD countries and from Russia, prepared this Report. The Group reviewed the safety research performed to support Russian-designed reactors and set down its views on future needs. The review concentrates on the following main topics: Thermal-Hydraulics/Plant Transients for VVERs; Integrity of Equipment and Structures for VVERs; Severe Accidents for VVERs; Operational Safety Issues; Thermal-Hydraulics/Plant Transients for RBMKs; Integrity of Equipment and Structures for RBMKs; Severe Accidents for RBMKs. (K.A.)

  20. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  1. Controlling the quality of replacement parts in nuclear station, class 1E equipment

    International Nuclear Information System (INIS)

    Pierson, R.K.; Clemons, R.W.

    1984-01-01

    Nuclear station owners have traditionally purchased replacement parts for Class 1E equipment from the original supplier of the equipment. By this method, part and equipment quality could be maintained. In recent years, however, this traditional source of parts has continuously declined as an increasing number of original equipment suppliers stop producing Class 1E equipment or no longer stock parts for older equipment. When replacement parts for Class 1E equipment are not obtainable from the original suppliers, equipment owners have created a variety of methods for assuring the quality of parts obtained from other sources. A standard that provides direction and guidance for maintaining the quality of Class 1E equipment when repaired with parts from alternate sources is, therefore, needed to assure the methods in use are satisfactory and to alert the equipment owners to additional acceptable methods. The standard has now been proposed. IEEE Standard P934 (June, 1983 Draft): ''Requirements for Replacement Parts for Class 1E Equipment in Nuclear Power Generating Stations'' (Ref-3) consist of an introductory section followed by sections on part selection, procurement, replacement (including inspections and tests), non-conforming conditions and records. The proposed standard also includes a non-mandatory appendix on acceptable procurement methods and a summary intended to assist the user in selecting a proper procurement method

  2. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  3. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  4. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  5. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  6. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  7. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  8. Distribution of Vapor Pressure in the Vacuum Freeze-Drying Equipment

    Directory of Open Access Journals (Sweden)

    Shiwei Zhang

    2012-01-01

    Full Text Available In the big vacuum freeze-drying equipment, the drying rate of materials is uneven at different positions. This phenomenon can be explained by the uneven distribution of vapor pressure in chamber during the freeze-drying process. In this paper, a mathematical model is developed to describe the vapor flow in the passageways either between material plates and in the channel between plate groups. The distribution of vapor pressure along flow passageway is given. Two characteristic factors of passageways are defined to express the effects of structural and process parameters on vapor pressure distribution. The affecting factors and their actions are quantitatively discussed in detail. Two examples are calculated and analyzed. The analysis method and the conclusions are useful to estimate the difference of material drying rate at different parts in equipment and to direct the choice of structural and process parameters.

  9. Lack of security of networked medical equipment in radiology.

    Science.gov (United States)

    Moses, Vinu; Korah, Ipeson

    2015-02-01

    OBJECTIVE. There are few articles in the literature describing the security and safety aspects of networked medical equipment in radiology departments. Most radiologists are unaware of the security issues. We review the security of the networked medical equipment of a typical radiology department. MATERIALS AND METHODS. All networked medical equipment in a radiology department was scanned for vulnerabilities with a port scanner and a network vulnerability scanner, and the vulnerabilities were classified using the Common Vulnerability Scoring System. A network sniffer was used to capture and analyze traffic on the radiology network for exposure of confidential patient data. We reviewed the use of antivirus software and firewalls on the networked medical equipment. USB ports and CD and DVD drives in the networked medical equipment were tested to see whether they allowed unauthorized access. Implementation of the virtual private network (VPN) that vendors use to access the radiology network was reviewed. RESULTS. Most of the networked medical equipment in our radiology department used vulnerable software with open ports and services. Of the 144 items scanned, 64 (44%) had at least one critical vulnerability, and 119 (83%) had at least one high-risk vulnerability. Most equipment did not encrypt traffic and allowed capture of confidential patient data. Of the 144 items scanned, two (1%) used antivirus software and three (2%) had a firewall enabled. The USB ports were not secure on 49 of the 58 (84%) items with USB ports, and the CD or DVD drive was not secure on 17 of the 31 (55%) items with a CD or DVD drive. One of three vendors had an insecure implementation of VPN access. CONCLUSION. Radiologists and the medical industry need to urgently review and rectify the security issues in existing networked medical equipment. We hope that the results of our study and this article also raise awareness among radiologists about the security issues of networked medical equipment.

  10. Research on the organization of equipment of nuclear emergency

    International Nuclear Information System (INIS)

    Li Xiaoming; Yang Jun

    2012-01-01

    The emergency rescue operation on major accident of nuclear facilities contains four kinds of abilities that are command and control, radiation protection, radiation monitoring and radioactive decontamination, so it needs to organize some equipment of nuclear emergency to enhance the efficiency of nuclear emergency operation. The organization of equipment of nuclear emergency should accord to the reality of the development in our country. It should have extractive structure, brief variety and advance capability, and also should be convenient, useful and adequate. The method of organization can first accord to the organization of group and organize the facilities accord to the organization of group of the emergency rescue force. (authors)

  11. The gravitational plant physiology facility-Description of equipment developed for biological research in spacelab

    Science.gov (United States)

    Heathcote, D. G.; Chapman, D. K.; Brown, A. H.; Lewis, R. F.

    1994-01-01

    In January 1992, the NASA Suttle mission STS 42 carried a facility designed to perform experiments on plant gravi- and photo-tropic responses. This equipment, the Gravitational Plant Physiology Facility (GPPF) was made up of a number of interconnected units mounted within a Spacelab double rack. The details of these units and the plant growth containers designed for use in GPPF are described. The equipment functioned well during the mission and returned a substantial body of time-lapse video data on plant responses to tropistic stimuli under conditions of orbital microgravity. GPPF is maintained by NASA Ames Research Center, and is flight qualifiable for future spacelab missions.

  12. Development of automatic Ultrasonic testing equipment for reactor pressure vessel

    International Nuclear Information System (INIS)

    Kim, Kor R.; Kim, Jae H.; Lee, Jae C.

    1996-06-01

    The selected weld areas of a reactor pressure vessel and adjacent piping are examined by the remote mechanized ultrasonic testing (MUT) equipment. Since the MUT equipment was purchased from southwest Research Institute (SwRI) in April 1985, 15 inservice inspections and 5 preservice inspections are performed with this MUT equipment. However due to the old age of the equipment and frequent movements to plant sites, the reliability of examination was recently decreased rapidly and it is very difficult to keep spare parts. In order to resolve these problems and to meet the strong request from plant sites, we intend to develop a new 3-axis control system including hardware and software. With this control system, we expect more efficient and reliable examination of the nozzle to shell weld areas, which is specified in ASME Code Section XI. The new 3-axis control system hardware and software were designed and development of our own control system, the advanced technologies of computer control mechanism were established and examination reliability of the nozzle to shell weld area was improved. With the development of our 3-axis control system for PaR ISI-2 computer control system, the reliability of nozzle to shell weld area examination has been improved. The established technologies from the development and detailed analysis of existing control system, are expected to be applied to the similar control systems in nuclear power plants. (author). 12 refs., 4 tabs., 33 figs

  13. Development of automatic Ultrasonic testing equipment for reactor pressure vessel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kor R.; Kim, Jae H.; Lee, Jae C.

    1996-06-01

    The selected weld areas of a reactor pressure vessel and adjacent piping are examined by the remote mechanized ultrasonic testing (MUT) equipment. Since the MUT equipment was purchased from southwest Research Institute (SwRI) in April 1985, 15 inservice inspections and 5 preservice inspections are performed with this MUT equipment. However due to the old age of the equipment and frequent movements to plant sites, the reliability of examination was recently decreased rapidly and it is very difficult to keep spare parts. In order to resolve these problems and to meet the strong request from plant sites, we intend to develop a new 3-axis control system including hardware and software. With this control system, we expect more efficient and reliable examination of the nozzle to shell weld areas, which is specified in ASME Code Section XI. The new 3-axis control system hardware and software were designed and development of our own control system, the advanced technologies of computer control mechanism were established and examination reliability of the nozzle to shell weld area was improved. With the development of our 3-axis control system for PaR ISI-2 computer control system, the reliability of nozzle to shell weld area examination has been improved. The established technologies from the development and detailed analysis of existing control system, are expected to be applied to the similar control systems in nuclear power plants. (author). 12 refs., 4 tabs., 33 figs.

  14. Mission Analysis for Using Preventive Radiological/Nuclear Detection Equipment for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, Brooke R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wood-Zika, Annmarie R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Haynes, Daniel [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Klemic, Gladys A. [US Dept. of Homeland Security National Urban Security Technology Lab., Manhattan, NY (United States); Musolino, Stephen V. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection (PRND) equipment to provide state and local agencies with scientific guidance on how to effectively use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed by technology manufacturers and purchased by responders for preventive detection and source interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management (CM) response take place, as it is currently the most widely available and fielded radiological instrumentation by state and local agencies. This effort will provide scientific guidance on the most effective way to utilize this class of equipment for consequence management missions. Gaining a better understanding of how PRND equipment can operate and perform for these missions will allow for recommendations on the tactical approach responders can use for consequence management operations. PRND equipment has been placed into service by federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be leveraged to support the emergency response in the aftermath of a radiological or nuclear event. With several hundred makes and models of PRND equipment, often with significantly different detection capabilities that do not align with their nominal PRND equipment type, development of a streamlined categorization scheme with respect to consequence management missions was the first step to identifying safe and effective uses of PRND equipment for radiological/nuclear incident response.

  15. Human performance for the success of equipment reliability programs

    International Nuclear Information System (INIS)

    Woodcock, J.

    2007-01-01

    Human performance is a critical element of programs directed at equipment reliability. Reliable equipment performance requires broad support from all levels of plant management and throughout all plant departments. Experience at both nuclear power plants and fuel manufacturing plants shows that human performance must be addressed during all phases of program implementation from the beginning through the establishment of a living, on-going process. At the beginning, certain organizational and management actions during the initiation of the program set the stage for successful adoption by station personnel, leading to more rapid benefits. For the long term, equipment reliability is a living process needed throughout the lifetime of a station, a program which must be motivated and measured. Sustained acceptance and participation by the plant personnel is a requirement, and culture is a key ingredient. This paper will provide an overview of key human performance issues to be considered, using the application of the INPO AP-913 Equipment Reliability Guideline as a basis and gives some best practices for training, communicating and implementing programs. The very last part includes ways to tell if the program is effective

  16. Special equipment support the fuel storage

    International Nuclear Information System (INIS)

    Vega, M. E.

    2014-01-01

    In the current juncture one of the keys to any company that works in a market that is as demanding as the nuclear, is its ability to developed new technological products that they can adapt to the different special situations/needs of nuclear Power Plants during their operating life. As an example, below are some of the specialized equipment that ENSA has been developing for more than thirty years that has been doing work in the area of fuel storage. (Author)

  17. Changing Needs of Business Education Students with Specific ...

    African Journals Online (AJOL)

    The need to face emerging challenges squarely should not be disregarded in today's world. Higher education is at the centre of preparing future business professionals and equipping them with the knowledge, skills and attitudes they will need address the emerging challenges of this century. Making specific reference to ...

  18. PENGUKURAN NILAI OVERALL EQUIPMENT EFFECTIVENESS SEBAGAI DASAR USAHA PERBAIKAN PROSES MANUFAKTUR PADA LINI PRODUKSI (Studi Kasus pada Stamping Production Division Sebuah Industri Otomotif

    Directory of Open Access Journals (Sweden)

    Robby Suhendra

    2005-01-01

    Full Text Available Overall Equipment Effectiveness (OEE is an effectiveness measurement method of equipment utilization in the implementation of Total Productive Maintenance (TPM. The ability of identification in details toward main problem and the cause factors that makes the improvement efforts become more focused is the reason why this method applied comprehensively by all manufacturing companies around the world. Manufacturing process at Stamping Production Division an automotive isdustry still keeps some unrevealed problems. This condition makes the achievement of OEE figure below the target that means production equipments are not utilized optimally yet. The expression of main problem and the cause factors is needed before the company starts some improvement efforts. This research is started by understanding the equipment losses that existed in company. Then, measuring the achievement of OEE figure in one period and through the pareto analysis toward the measurement's results, the main problem and the cause factors are obtained and clearly depicted in cause-and-effect diagram. Abstract in Bahasa Indonesia : Overall Equipment Effectiveness (OEE adalah metode pengukuran efektivitas penggunaan suatu peralatan. OEE dikenal sebagai salah satu aplikasi progam Total Productive Maintenance (TPM. Kemampuan mengidentifikasikan secara jelas akar permasalahan dan faktor penyebabnya sehingga membuat usaha perbaikan menjadi terfokus merupakan faktor utama metode ini diaplikasikan secara menyeluruh oleh banyak perusahaan didunia. Saat ini proses manufaktur di Stamping Production Division sebuah industri otomotif memiliki permasalahan yang belum terungkap jelas. Hal tersebut mengakibatkan penggunaan peralatan yang ada belum optimal. Pengungkapan akar masalah dan faktor penyebabnya diperlukan sebelum perusahaan melakukan usaha perbaikan. Penelitian ini dimulai dengan mengidentifikasi kerugian peralatan (Equipment Losses yang terjadi. Kemudian mengukur pencapaian nilai OEE

  19. Transuranic package transporter (TRUPACT) system design status and operational support equipment

    International Nuclear Information System (INIS)

    Johanson, N.W.; Meyer, R.J.; Romesberg, L.E.; Pope, R.B.

    1983-01-01

    A program was initiated in the late 1970's at Sandia National Laboratories to develop an efficient, safe, reliable, and cost-effective transportation packaging system for the carriage of contact-handled transuranic (CH-TRU) waste within the Department of Energy (DOE) complex. It is anticipated that eventually a family of TRUPACT (TRansUranic PACKage Transporter) systems having varied dimensions and weight/volume capacities will be needed by the DOE to transport different CH-TRU waste forms. Each TRUPACT system will be a Type B packaging. Large quantities of CH-TRU wastes having many different forms, isotopic contents, and contained in a variety of waste containers have been, are being, and will continue to be produced and stored for ultimate disposal. Packaging design is being closely coordinated with facility designs to ensure the rapid and economic integration of the TRUPACT system. The first packaging developed for transport by truck or rail (bimodal) is designated TRUPACT-I and will become operational in 1984. This paper provides an overview of progress on the TRUPACT-I design and details of equipment to be used for interfacing with users

  20. The design and equipments of hospital pharmacies in Isfahan, Iran

    Directory of Open Access Journals (Sweden)

    Ali Mohammad Sabzghabaee

    2010-01-01

    Full Text Available Background: Nowadays pharmaceutical care departments located in hospitals are amongst the important pillars of the healthcare system. The aim of this study was to evaluate designing features and equipments of hospital drugstores affiliated with Isfahan University of Medical Sciences. Methods: In this cross-sectional study a self-defined and validated questionnaire was used which included all the necessary and standard needed spaces and equipments of an ideal hospital pharmacy. The questionnaire was filled in by one of the researchers in all twelve hospital drugstores located in the teaching and non-teaching hospitals affiliated with Isfahan University of Medical Sciences. Data analysis was done using SPSS (version 14. Results: Results showed that 56% of drugstore space allocations were unsuitable. Used pharmaceutical equipments in 75% of surveyed hospitals were not according to the standards. Almost all of these pharmacies had rather an enough space for storage, but cold storages were not designed in 58% of them. In 66% of perused hospitals, pharmaceutical services disposal level was admissible. The structural engineering parameters like size and dimensions, available spaces, availability of structural planes, existence of air conditioning systems and brightness controllers, adequate stores for drugs and safe places for narcotics were observed in 55% of pharmacies. Conclusions: There are apparent out of standard space allocations and shortages of needed equipments for offering drug services in studied drugstores that may probably lead to a waste of time and money. These issues may reduce the efficiency and safety of pharmaceutical services and drug administration in hospitals.

  1. Protective equipment and the prevention of concussion - what is the evidence?

    Science.gov (United States)

    Navarro, Rodolfo R

    2011-01-01

    The complex nature of the evaluation and management of concussion lends to controversy, and the immediate and long-term implications still are being investigated. Various types of protective equipment have been used as a means to prevent concussions, and protective equipment is being used more frequently in different sports. Recent investigations have suggested that a protective, but not preventive, effect may be afforded by mouthguard use in rugby players, headgear use in soccer players, and customized mandibular orthotic use in football players. The use of faceshields has not shown a proven benefit in preventing the incidence of sport-related concussion in ice hockey or field hockey participants. Further studies are needed to clarify the role of protective equipment in the prevention of sport-related concussion.

  2. Nuclear Weak Rates and Detailed Balance in Stellar Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Misch, G. Wendell, E-mail: wendell@sjtu.edu, E-mail: wendell.misch@gmail.com [Department of Physics and Astronomy, Shanghai Jiao Tong University, 800 Dong Chuan Road, Shanghai 200240 (China)

    2017-07-20

    Detailed balance is often invoked in discussions of nuclear weak transitions in astrophysical environments. Satisfaction of detailed balance is rightly touted as a virtue of some methods of computing nuclear transition strengths, but I argue that it need not necessarily be strictly obeyed in astrophysical environments, especially when the environment is far from weak equilibrium. I present the results of shell model calculations of nuclear weak strengths in both charged-current and neutral-current channels at astrophysical temperatures, finding some violation of detailed balance. I show that a slight modification of the technique to strictly obey detailed balance has little effect on the reaction rates associated with these strengths under most conditions, though at high temperature the modified technique in fact misses some important strength. I comment on the relationship between detailed balance and weak equilibrium in astrophysical conditions.

  3. Long-term preventive maintenance of instrumentation control equipment for PWR plants

    International Nuclear Information System (INIS)

    Sugitani, S.; Nanba, M.

    2006-01-01

    Since the PWR plants in Japan have been operated more than 30 years, main instrumentation control equipment of analog systems has been renewed to digital control systems. Renewal works had to be done in short period within periodical inspection term and for several facilities. The Mitsubishi LTD group had been provided with these market needs by its digital control system (MELTAC-NplusR 3) applicable to main instrumentation control equipment for primary and secondary systems and had already finished the renewal for practical plants. (T. Tanaka)

  4. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  5. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  6. Reliability and maintainability data acquisition in equipment development tests

    International Nuclear Information System (INIS)

    Haire, M.J.; Gift, E.H.

    1983-10-01

    The need for collection of reliability, maintainability, and availability data adds a new dimension to the data acquisition requirements of equipment development tests. This report describes the reliability and maintainability data that are considered necessary to ensure that sufficient and high quality data exist for a comprehensive, quantitative evaluation of equipment and system availability. These necessary data are presented as a set of data collection forms. Three data acquisition forms are discussed: an inventory and technical data form, which is filed by the design engineer when the design is finished or the equipment is received; an event report form, which is completed by the senior test operator at each shutdown; and a maintainability report, which is a collaborative effort between senior operators and lead engineers and is completed on restart. In addition, elements of a reliability, maintainability evaluation program are described. Emphasis is placed on the role of data, its storage, and use in such a program

  7. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment; El och kontrollutrustning i kaernkraftverk - Problematik vid utbyte av aaldrad utrustning

    Energy Technology Data Exchange (ETDEWEB)

    Nordling, Anna; Haakansson, Goeran

    2012-11-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  8. Cold Atmospheric Plasma Technology for Decontamination of Space Equipment

    Science.gov (United States)

    Thomas, Hubertus; Rettberg, Petra; Shimizu, Tetsuji; Thoma, Markus; Morfill, Gregor; Zimmermann, Julia; Müller, Meike; Semenov, Igor

    2016-07-01

    Cold atmospheric plasma (CAP) technology is very fast and effective in inactivation of all kinds of pathogens. It is used in hygiene and especially in medicine, since the plasma treatment can be applied to sensitive surfaces, like skin, too. In a first study to use CAP for the decontamination of space equipment we could show its potential as a quite promising alternative to the standard "dry heat" and H2O2 methods [Shimizu et al. Planetary and Space Science, 90, 60-71. (2014)]. In a follow-on study we continue the investigations to reach high application level of the technology. First, we redesign the actual setup to a plasma-gas circulation system, increasing the effectivity of inactivation and the sustainability. Additionally, we want to learn more about the plasma chemistry processes involved in the inactivation. Therefore, we perform detailed plasma and gas measurements and compare them to numerical simulations. The latter will finally be used to scale the decontamination system to sizes useful also for larger space equipment. Typical materials relevant for space equipment will be tested and investigated on surface material changes due to the plasma treatment. Additionally, it is planned to use electronic boards and compare their functionality before and after the CAP expose. We will give an overview on the status of the plasma decontamination project funded by the Bavarian Ministry of Economics.

  9. Costs and indices for domestic oil and gas field equipment and production operations 1990 through 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-08

    This report presents estimated costs and indice for domestic oil and gas field equipment and production operations for 1990, 1991, 1992, and 1993. The costs of all equipment and serives were those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of oil wells to gas wells. The body of the report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (costs and lease availability) have significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas production equipment and operations.

  10. Costs and indices for domestic oil and gas field equipment and production operations 1990 through 1993

    International Nuclear Information System (INIS)

    1994-01-01

    This report presents estimated costs and indice for domestic oil and gas field equipment and production operations for 1990, 1991, 1992, and 1993. The costs of all equipment and serives were those in effect during June of each year. The sums (aggregates) of the costs for representative leases by region, depth, and production rate were averaged and indexed. This provides a general measure of the increased or decreased costs from year to year for lease equipment and operations. These general measures do not capture changes in industry-wide costs exactly because of annual variations in the ratio of oil wells to gas wells. The body of the report contains summary tables, and the appendices contain detailed tables. Price changes for oil and gas, changes in taxes on oil and gas revenues, and environmental factors (costs and lease availability) have significant impact on the number and cost of oil and gas wells drilled. These changes also impact the cost of oil and gas production equipment and operations

  11. Stakeholder needs for ground penetrating radar utility location

    Science.gov (United States)

    Thomas, A. M.; Rogers, C. D. F.; Chapman, D. N.; Metje, N.; Castle, J.

    2009-04-01

    In the UK alone there are millions of miles of underground utilities with often inaccurate, incomplete, or non-existent location records that cause significant health and safety problems for maintenance personnel, together with the potential for large, unnecessary, social and financial costs for their upkeep and repair. This has led to increasing use of Ground Penetrating Radar (GPR) for utility location, but without detailed consideration of the degree of location accuracy required by stakeholders — i.e. all those directly involved in streetworks ranging from utility owners to contractors and surveyors and government departments. In order to ensure that stakeholder requirements are incorporated into a major new UK study, entitled Mapping the Underworld, a questionnaire has been used to determine the current and future utility location accuracy requirements. The resulting data indicate that stakeholders generally require location tolerances better than 100 mm at depths usually extending down to 3 m, and more occasionally to 5 m, below surface level, providing significant challenges to GPR if their needs are to be met in all ground conditions. As well as providing much useful data on stakeholder needs, these data are also providing a methodology for assessment of GPR utility location in terms of the factor most important to them — the degree to which the equipment provides location within their own accuracy requirements.

  12. Clinical professional governance for detailed clinical models.

    Science.gov (United States)

    Goossen, William; Goossen-Baremans, Anneke

    2013-01-01

    This chapter describes the need for Detailed Clinical Models for contemporary Electronic Health Systems, data exchange and data reuse. It starts with an explanation of the components related to Detailed Clinical Models with a brief summary of knowledge representation, including terminologies representing clinic relevant "things" in the real world, and information models that abstract these in order to let computers process data about these things. Next, Detailed Clinical Models are defined and their purpose is described. It builds on existing developments around the world and accumulates in current work to create a technical specification at the level of the International Standards Organization. The core components of properly expressed Detailed Clinical Models are illustrated, including clinical knowledge and context, data element specification, code bindings to terminologies and meta-information about authors, versioning among others. Detailed Clinical Models to date are heavily based on user requirements and specify the conceptual and logical levels of modelling. It is not precise enough for specific implementations, which requires an additional step. However, this allows Detailed Clinical Models to serve as specifications for many different kinds of implementations. Examples of Detailed Clinical Models are presented both in text and in Unified Modelling Language. Detailed Clinical Models can be positioned in health information architectures, where they serve at the most detailed granular level. The chapter ends with examples of projects that create and deploy Detailed Clinical Models. All have in common that they can often reuse materials from earlier projects, and that strict governance of these models is essential to use them safely in health care information and communication technology. Clinical validation is one point of such governance, and model testing another. The Plan Do Check Act cycle can be applied for governance of Detailed Clinical Models

  13. Design of equipment management information system for nuclear power plant

    International Nuclear Information System (INIS)

    Wang Chengyuan

    1996-01-01

    The author describes the ideas and practical method for need analysis, system function dividing, code design, program design and network disposition of equipment purchase management system of nuclear power plant during building, from the view of engineering investment control, schedule control and quality control

  14. Wideband Modeling of Power Transformers Using Commercial sFRA Equipment

    DEFF Research Database (Denmark)

    Holdyk, Andrzej; Gustavsen, B.; Arana Aristi, Ivan

    2014-01-01

    is light-weight and considerably less expensive than dedicated high precision laboratory equipment. The use of 50 Ω termination resistors allows measuring the terminal admittance matrix without a need for correcting for the measurement cables. The measured admittance matrix is next subjected to rational...

  15. CEO's guide to world business costs : oil and gas equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This paper presents the results of a detailed study of wellhead equipment manufacturing costs in 11 countries in North America, Europe and Asia-Pacific. According to the Economist Intelligence Unit (EIU), Canada has a 5 per cent cost advantage and will be the best country in the world to do business between 2004 to 2008 because of its foreign trade policies, high quality infrastructure and market opportunities within the North American marketplace. KPMG Consulting developed a web-based cost model that allows investors to examine the costs involved in setting up and operating a business in more than 120 cities in Canada, the United States, the United Kingdom, France, Germany, Italy, Iceland, Luxembourg, the Netherlands, Japan and Australia. According to the model, a comparison of annual costs for oil and gas wellhead equipment manufacturing was presented for the 11 countries with reference to revenues, costs, and profits before and after income tax. In addition, Canada's research and development (R and D) cost advantage compared to the United States was presented, with reference to tax credits, expenditures, salaries, contracts, capital equipment, volume-based tax credits, and research studies. This report also includes a brief summary of 3 oil and gas companies that came to Canada and prospered. tabs., figs

  16. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  17. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  18. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  19. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  20. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  1. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  2. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  3. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  4. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  5. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  6. Authorisation for work with electrical equipment

    CERN Multimedia

    Balle, Christoph

    2013-01-01

    The evaluation of training needs must be conducted by the Group Leader for every employee who could potentially be exposed to an electrical hazard. An analysis must be performed taking into account: • the voltage range (TBT, BT, HTA, HTB) • the type of work to be done (for example, work on a low-voltage line) • the type and the characteristics of the structures, installations and equipment • the type of current (alternating or direct) • the person’s ability to perform the operation

  7. Developing ''smar'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; Spencer, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of : (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased funding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the S mart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations . This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABBCENP), Sandia National Laboratories, Duke Engineering and Services (DEandS), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of ''smart'' equipment and predicitve maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the ''smart'' quipment program will: 1. Identify the prioritize nulcear plant equipment that would most likely benefit from adding smart features, 2. Developa methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i. e. ''smart'' equipment), 3. Developa methodology to provide plant operators with real-time information through ''smart'' equipment Man-Machine Interfaces (MMI) to support their decision making, 4. Demonstrate the methodology on a targeted component and/or system, 5. Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed

  8. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  9. An Analysis of Price Determination and Markups in the Air-Conditioning and Heating Equipment Industry

    Energy Technology Data Exchange (ETDEWEB)

    Dale, Larry; Millstein, Dev; Coughlin, Katie; Van Buskirk, Robert; Rosenquist, Gregory; Lekov, Alex; Bhuyan, Sanjib

    2004-01-30

    In this report we calculate the change in final consumer prices due to minimum efficiency standards, focusing on a standard economic model of the air-conditioning and heating equipment (ACHE) wholesale industry. The model examines the relationship between the marginal cost to distribute and sell equipment and the final consumer price in this industry. The model predicts that the impact of a standard on the final consumer price is conditioned by its impact on marginal distribution costs. For example, if a standard raises the marginal cost to distribute and sell equipment a small amount, the model predicts that the standard will raise the final consumer price a small amount as well. Statistical analysis suggest that standards do not increase the amount of labor needed to distribute equipment the same employees needed to sell lower efficiency equipment can sell high efficiency equipment. Labor is a large component of the total marginal cost to distribute and sell air-conditioning and heating equipment. We infer from this that standards have a relatively small impact on ACHE marginal distribution and sale costs. Thus, our model predicts that a standard will have a relatively small impact on final ACHE consumer prices. Our statistical analysis of U.S. Census Bureau wholesale revenue tends to confirm this model prediction. Generalizing, we find that the ratio of manufacturer price to final consumer price prior to a standard tends to exceed the ratio of the change in manufacturer price to the change in final consumer price resulting from a standard. The appendix expands our analysis through a typical distribution chain for commercial and residential air-conditioning and heating equipment.

  10. UV-treatment in dermatology. Equipment and methods in Norwegian university hospitals

    International Nuclear Information System (INIS)

    Christensen, T.; Johnsen, B.; Johnsson, M.; Nordal, E.; Thune, P.; Kjeldstad, B.; Reitan, J.B.

    1994-12-01

    The use of phototherapy and the phototherapy-equipment were studied in five Norwegian university hospitals. The indications and the methods used were relatively similar, as well as the equipment used for dosimetry. The spectra and irradiance from the phototherapy lamps were measured and the variations in these parameters were evaluated. It is discussed whether there is a need for closer control and standardization of these parameters. The UVA-irradiance that could be experienced by the persons employed in the departments was found to be lower than the recommended limits. 12 refs., 7 figs., 6 tabs

  11. Development of the testing procedure for units and elements of mining equipment

    Directory of Open Access Journals (Sweden)

    P. B. Gerike

    2017-09-01

    Full Text Available The author considers in detail the stages of creating a testing procedure for mining equipment based on the complex implementation of principles of nondestructive testing and technical diagnostics. The author substantiates effectiveness of application of a complex diagnostic approach for assessing the state of metal structures and energy-mechanical equipment of mining machines. The opportunity for timely detection of defects, regardless of their type and degree of danger, presents itself only with a wide application of the modern methods of vibration diagnostics and nondestructive testing. The author substantiates the effectiveness of specific combination of methods of nondestructive testing, most optimally suited for solving given tasks. The article contains the developed complex of more than 120 diagnostic rules, suitable for performing automated analysis of vibroacoustic signal and revealing the main damages of energy-mechanical equipment based on selective groups of informative frequencies. The author formulates the main criteria that one can use as a basic platform for improving the methodology for normalizing the parameters of mechanical oscillations. The developed diagnostic criteria became a basis for the development of individual spectral masks suitable for performing the analysis of parameters of vibroacoustic waves generated during operation of mining equipment. The author proves necessity of transition of repair and maintenance divisions of industrial enterprises to the system of maintenance of machinery according to its actual technical state, and the developed complex of diagnostic rules for detecting defects can serve as a platform for the implementation of basic elements of this system. The author substantiates the principal validity of the developed methodology for testing mining machines equipment and its individual elements, such as the predictive modeling of degradation of technical state of mining equipment and the

  12. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex E - Report of the electric Equipment Service

    International Nuclear Information System (INIS)

    Sanovic, V.; Stamenkovic, D.

    1985-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period [sr

  13. US DOE Radiological Assistance Program: personnel, equipment and resources

    International Nuclear Information System (INIS)

    Hull, A.P.; Kuehner, A.V.; Phillips, L.F.

    1982-01-01

    The Radiological Assistance Program (RAP) of the US Department of Energy (DOE) is intended to provide emergency advice and assistance in the event of radiological incidents. Each of DOE's eight Regional Coordinating Offices in the US provide a 24-hour reporting and response capability. Specifically, the Brookhaven Area Office (BHO) is responsible for DOE's Region I, which includes the 11 northeastern states of the US. Although an inventory of dedicated equipment is assigned to BHO-RAP, it draws upon the resources of Brookhaven National Laboratory (BNL) for trained personnel in health physics and for other specialized personnel in both the day to day operation of the program and in the on-the-scene response to an incident. The organization of the BHO-RAP program and its response procedures are described in detail. An inventory and brief description of the contents of a variety of emergency equipment kits and of additional state-of-the-art instruments is included. The BHO-RAP guidelines and requirements for field operations are also indicated, as are other DOE resources upon which it can draw

  14. Human-centered design of the human-system interfaces of medical equipment: thyroid uptake system

    International Nuclear Information System (INIS)

    Monteiro, Jonathan K.R.; Farias, Marcos S.; Santos, Isaac J.A. Luquetti; Monteiro, Beany G.

    2013-01-01

    Technology plays an important role in modern medical centers, making healthcare increasingly complex, relying on complex technical equipment. This technical complexity is particularly noticeable in the nuclear medicine. Poorly design human-system interfaces can increase the risks for human error. The human-centered approach emphasizes the development of the equipment with a deep understanding of the users activities, current work practices, needs and abilities of the users. An important concept of human-centered design is that the ease-of-use of the equipment can be ensured only if users are actively incorporated in all phases of the life cycle of design process. Representative groups of users are exposed to the equipment at various stages in development, in a variety of testing, evaluation and interviewing situations. The users feedback obtained is then used to refine the design, with the result serving as input to the next interaction of design process. The limits of the approach are that the users cannot address any particular future needs without prior experience or knowledge about the equipment operation. The aim of this paper is to present a methodological framework that contributes to the design of the human-system interfaces, through an approach related to the users and their activities. A case study is described in which the methodological framework is being applied in development of new human-system interfaces of the thyroid uptake system. (author)

  15. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  16. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  17. NOW ON THE WEB SALES AND PURCHASE OF OBSOLETE OR SURPLUS EQUIPMENT

    CERN Multimedia

    2000-01-01

    The Recuperation and Sales Service wishes to recall that obsolete or surplus equipment which is no longer needed at CERN may be sold to outside institutes, members of the personnel, companies, etc. For this purpose an 'on-line sales and purchase tool' has been developed and installed on the web: consult the 'Recuperation and Sales Service' site on the CERN homepage. Users wishing to eliminate or sell obsolete or surplus equipment are invited to use the tool to issue an 'on-line sales request' and users who are looking for cheap 2nd hand equipment may consult the 'on-line sales catalogue' and make 'on-line purchase bids'. The direct sale of low value equipment, which takes place Thursdays 13h30 ­ 15h30 in the Recuperation Centre, building 133, will continue as before. For more information contact the Recuperation & Sales Service, tel. 75782 or 78665.

  18. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  19. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  20. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  1. Putting agricultural equipment and digital technologies at the cutting edge of agroecology

    Directory of Open Access Journals (Sweden)

    Bellon Maurel Véronique

    2017-05-01

    Full Text Available The agro-ecological transition is an ambitious challenge. It can be met by implementing the fundamentals of agroecology (use of biodiversity, integration of agriculture in landscapes, closure of flow loops in the context of a broad and renewed offer of technologies: agro-equipment, biotechnology, digital technologies… This article explores the role that agro-equipment and digital services can play in this transition. These technologies contribute through various levers to the agro-ecological transition: by improving farming efficiency (more service rendered for the same environmental impact, by precision farming (adaptation of the operations to the needs of the plant or the animal based on a monitoring–diagnosis–recommendation cycle and by the development of specialized machinery helping the farmer to achieve “flow loop-closing” (at the plot level, by maintaining the soil quality, or at the farm level, with the recycling of organic effluents or to take advantage of biodiversity (e.g., with agro-equipment adapted to mixed crops. The technological bricks that are requested and for which advances are expected are: sensors (to measure plant or animal needs and associated digital technologies (information transfer, data processing, precision technologies for input application, robotics, specialized machines to manage soil cover and weeds, or for agroforestry. The brakes and engines for innovation in agro-equipment are studied. The brakes are the generally small structure of the farm manufacturing companies, the deficit of the demand from farmers and the complexity − either real or perceived − of these equipments. To encourage innovation, several levers are to be used: involving users in the design of agro-equipments, creating financial incentives for innovative equipment purchase, and training end-users, prescribers and dealers to the high potential of these new technologies. In conclusion, putting agro-equipment and digital technology

  2. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  3. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  4. Development and capital investment tasks involved in the production of charge transfer equipment

    International Nuclear Information System (INIS)

    Simon, Sandor

    1983-01-01

    Stringent requirements had to be considered in the course of the production development of charge transfer equipment. The production of structures demanding extremely high endurance was based on extensive co-operation. Special alloys were needed for parts and bearings, special heat-treatment was required at certain sections for large dimensions etc. Appropriate mashine stock, assembly and test hall have been built for assembling and testing the equipment with both 440 and 100 MW.(Sz.J.)

  5. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  6. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  7. Mobile equipment maintenance at Elk Valley Coal Corporation Fording River

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Major loading and support equipment, haul trucks, and the number of staff and hourly tradesmen working in the maintenance manpower division at Elk Valley Coal are listed. Maintenance strategies are safety, high maintenance of equipment availabilities and reliability, cost reduction, and maximized productivity of assets. Maintenance assets comprise a large shop, shovel and drill crew, machine shop, light vehicle facility, line crew, radio technicians, and cranes. Most maintenance work is completed in- house. Fording River uses a Computerized Maintenance Management System (CMMS) that was developed in-house to match business needs. Several examples of the application of Reliability Centered Maintenance (RCM) are described. 12 figs., 2 tabs.

  8. Research cooperation project on environmentally friendly technology for highly efficient mineral resources extraction and treatment. Detail design for pilot plant (Mechanical fabrication)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The paper prepared plans of the mechanical equipment in the detailed design of a pilot plant in the joint research project on the environmental protection technology for highly efficient mineral resource extraction and treatment. (NEDO)

  9. Breast cancer screening activity in the Mie medical network, with special reference to the actual circumstances of detailed examination

    International Nuclear Information System (INIS)

    Nakai, Masahiro; Kawaguchi, Kanako; Kobayashi, Shigeki

    2009-01-01

    For clarifying both the current circumstances and problems of closed examination performed at facilities equipped for detailed examination in Mie Prefecture, we analyzed the results of closed examinations carried out on 1,001 responders who were selected by primary mammography screening done at 87 facilities in 2006. The overall breast cancer detection rate was 3.3%, with a range of 0-10.3%, for facilities that included family doctors, and 13 hospitals having performed the closed examination on 21 women or more. Although the location of a facility for closed examination and the background of examinees might be taken into consideration, it appeared that a higher cancer detection rate was obtained when more pathological examinations were carried out, and that the indications for pathological examination varied among physicians. At facilities where pathological examinations were frequently performed, mostly clinicians specializing in breast cancer performed either fine-needle aspiration biopsy or large-needle biopsy (a specific aspiration biopsy technique for calcified lesions), whereas at facilities with low rates of pathological examination, most surgeons not specializing in breast cancer performed open biopsy. These results suggest a need to draw up guidelines for detailed examination, including the standard of facilities for closed examination, clinicians who perform the examinations, and the examination methods. (author)

  10. Benefits Of Vibration Analysis For Development Of Equipment In HLW Tanks - 12341

    International Nuclear Information System (INIS)

    Stefanko, D.; Herbert, J.

    2012-01-01

    collected during pre-installation tests and screened for: Critical speeds or resonance, Imbalance of rotating parts, Shaft misalignment, Fluid whirl or lubrication break down, Bearing damages, and Other component abnormalities. Examples of previous changes in operating parameters and fabrication tolerances and extension of equipment life resulting from the SRS vibration analysis program include: (1) Limiting operational speeds for some pumps to extend service life without design or part changes; (2) Modifying manufacturing methods (tightening tolerances) for impellers on slurry mixing pumps based on vibration data that indicated hydraulic imbalance; (3) Identifying rolling element mounting defects and replacing those components in pump seals before installation; and (4) Identifying the need for bearing design modification for SRS long-shaft mixing pump designs to eliminate fluid whirl and critical speeds which significantly increased the equipment service life. In addition, vibration analyses and related analyses have been used during new equipment scale-up tests to identify the need for design improvements for full-scale operation / deployment of the equipment in the full size tanks. For example, vibration analyses were recently included in the rotary micro-filtration scale-up test program at SRNL.

  11. BENEFITS OF VIBRATION ANALYSIS FOR DEVELOPMENT OF EQUIPMENT IN HLW TANKS - 12341

    Energy Technology Data Exchange (ETDEWEB)

    Stefanko, D.; Herbert, J.

    2012-01-10

    collected during pre-installation tests and screened for: Critical speeds or resonance, Imbalance of rotating parts, Shaft misalignment, Fluid whirl or lubrication break down, Bearing damages, and Other component abnormalities. Examples of previous changes in operating parameters and fabrication tolerances and extension of equipment life resulting from the SRS vibration analysis program include: (1) Limiting operational speeds for some pumps to extend service life without design or part changes; (2) Modifying manufacturing methods (tightening tolerances) for impellers on slurry mixing pumps based on vibration data that indicated hydraulic imbalance; (3) Identifying rolling element mounting defects and replacing those components in pump seals before installation; and (4) Identifying the need for bearing design modification for SRS long-shaft mixing pump designs to eliminate fluid whirl and critical speeds which significantly increased the equipment service life. In addition, vibration analyses and related analyses have been used during new equipment scale-up tests to identify the need for design improvements for full-scale operation / deployment of the equipment in the full size tanks. For example, vibration analyses were recently included in the rotary micro-filtration scale-up test program at SRNL.

  12. Author Details

    African Journals Online (AJOL)

    Details PDF · Vol 22, No 2 (1999) - Articles Vegetation under different tree species in Acacia woodland in the Rift Valley of Ethiopia Details PDF · Vol 22, No 2 (1999) - Articles Preliminary evaluation of Phytomyza orobanchia (Diptera: Agromyzidae) as a controller of Orobanche spp in Ethiopia Details PDF. ISSN: 2520–7997.

  13. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  14. Technical Needs for Enhancing Risk Monitors with Equipment Condition Assessment for Advanced Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Coble, Jamie B.; Coles, Garill A.; Ramuhalli, Pradeep; Meyer, Ryan M.; Berglin, Eric J.; Wootan, David W.; Mitchell, Mark R.

    2013-04-04

    Advanced small modular reactors (aSMRs) can provide the United States with a safe, sustainable, and carbon-neutral energy source. The controllable day-to-day costs of aSMRs are expected to be dominated by operation and maintenance costs. Health and condition assessment coupled with online risk monitors can potentially enhance affordability of aSMRs through optimized operational planning and maintenance scheduling. Currently deployed risk monitors are an extension of probabilistic risk assessment (PRA). For complex engineered systems like nuclear power plants, PRA systematically combines event likelihoods and the probability of failure (POF) of key components, so that when combined with the magnitude of possible adverse consequences to determine risk. Traditional PRA uses population-based POF information to estimate the average plant risk over time. Currently, most nuclear power plants have a PRA that reflects the as-operated, as-modified plant; this model is updated periodically, typically once a year. Risk monitors expand on living PRA by incorporating changes in the day-by-day plant operation and configuration (e.g., changes in equipment availability, operating regime, environmental conditions). However, population-based POF (or population- and time-based POF) is still used to populate fault trees. Health monitoring techniques can be used to establish condition indicators and monitoring capabilities that indicate the component-specific POF at a desired point in time (or over a desired period), which can then be incorporated in the risk monitor to provide a more accurate estimate of the plant risk in different configurations. This is particularly important for active systems, structures, and components (SSCs) proposed for use in aSMR designs. These SSCs may differ significantly from those used in the operating fleet of light-water reactors (or even in LWR-based SMR designs). Additionally, the operating characteristics of aSMRs can present significantly different

  15. FY 2000 Research and development of technology for medical and welfare equipment. Report on the comprehensive survey on welfare equipment; 2000 nendo iryo fukushi kiki gijutsu kenkyu kaihatsu chosa hokokusho. Fukushi kiki sogo chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    The survey is conducted on the advanced basic and application technologies for medical and welfare equipment, e.g., biotechnology and drug delivery systems, to promote development of these technologies. For development of the gene-aided diagnostic system equipment for clinical purposes, surveys are conducted on current medical equipment and related technologies, and the results are summarized and pigeonholed for each equipment type. Also summarized are the small- to medium-sized enterprises which are considered to have techniques needed for development of sensors for heart disease treatment systems. For usability of welfare-related equipment products, investigations are made viewed from the designs oriented to human adaptability, human adaptable designs in the aging societies, and welfare-related problems in the aging societies and usability. The latest information on leading organizations and researchers is collected, for continuation and development of the usability programs for welfare-related equipment products, and also for inviting the current related technologies and researchers on life supporting for the aged in Japan to the programs. (NEDO)

  16. Nuclear EQ sourcebook: A compilation of documents for nuclear equipment qualification

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    In the nuclear power industry, environmental and seismic qualification of safety-related electrical and instrumentation equipment is collectively known as Equipment Qualification (EQ). Related technology, as well as regulatory requirements, have evolved rapidly during the last 15 years. For environmental qualification, what began in 1971 with one trial-use guide (IEEE Std 323-1971), now stands as a full complement of Nuclear Regulatory Commission (NRC) rules, guides and industry standards. In addition to the Institute of Electrical and Electronics Engineers (IEEE), the American Society of Mechanical Engineers (ASME) has also undertaken development of its own set of standards for use in qualifying safety-related mechanical equipment. To ensure that the original design and qualification is preserved, engineers need to select and use the correct set of NRC regulations, regulatory guides, industry standards, and generic correspondence. Given that the total number of these documents exceed 200, this task becomes resource intensive. This compilation is the first known publication available to serve the user-community need for a complete and exhaustive single source. Approximately 180 items (Bulletins, Federal Rules, Generic Letters, Notices, Regulatory Guides, IEEE Standards, IEEE Recommended Practices, and IEEE Guides) have been processed separately for inclusion on the data base

  17. Integrated Instrumentation and Sensor Systems Enabling Condition-Based Maintenance of Aerospace Equipment

    Directory of Open Access Journals (Sweden)

    Richard C. Millar

    2012-01-01

    Full Text Available The objective of the work reported herein was to use a systems engineering approach to guide development of integrated instrumentation/sensor systems (IISS incorporating communications, interconnections, and signal acquisition. These require enhanced suitability and effectiveness for diagnostics and health management of aerospace equipment governed by the principles of Condition-based maintenance (CBM. It is concluded that the systems engineering approach to IISS definition provided clear benefits in identifying overall system requirements and an architectural framework for categorizing and evaluating alternative architectures, relative to a bottom up focus on sensor technology blind to system level user needs. CBM IISS imperatives identified include factors such as tolerance of the bulk of aerospace equipment operational environments, low intrusiveness, rapid reconfiguration, and affordable life cycle costs. The functional features identified include interrogation of the variety of sensor types and interfaces common in aerospace equipment applications over multiplexed communication media with flexibility to allow rapid system reconfiguration to adapt to evolving sensor needs. This implies standardized interfaces at the sensor location (preferably to open standards, reduced wire/connector pin count in harnesses (or their elimination through use of wireless communications.

  18. [Interhospital transfer--clinical approach: equipment, risks and complications].

    Science.gov (United States)

    Melzer-Gartzke, Christoph

    2013-05-01

    Interhospital transfers are an integral part of German health care system and a prerequisite to provide specialist investigation, management and best possible outcome for all patients irrespective of regional differences in medical care. In order to reduce transport associated risks to a minimum, adequate specialized transport teams and modern equipped transport vehicles are needed better and better adapted to regional and demographic changes. © Georg Thieme Verlag Stuttgart · New York.

  19. Sustainable energy conversion for electricity and coproducts principles, technologies, and equipment

    CERN Document Server

    Rao, Ashok

    2015-01-01

    Provides an introduction to energy systems going on to describe various forms of energy sources Provides a comprehensive and a fundamental approach to the study of sustainable fuel conversion for the generation of electricity and for coproducing synthetic fuels and chemicals Covers the underlying principles of physics and their application to engineering including thermodynamics of combustion and power cycles, fluid flow, heat transfer, and mass transfer Details the coproduction of fuels and chemicals including key equipment used in synthesis and specific examples of coproduction in integrated

  20. Using a detailed inventory of a large wastewater treatment plant to estimate the relative importance of construction to the overall environmental impacts.

    Science.gov (United States)

    Morera, Serni; Corominas, Lluís; Rigola, Miquel; Poch, Manel; Comas, Joaquim

    2017-10-01

    The aim of this work is to quantify the relative contribution to the overall environmental impact of the construction phase compared to the operational phase for a large conventional activated sludge wastewater treatment plant (WWTP). To estimate these environmental impacts, a systematic procedure was designed to obtain the detailed Life Cycle Inventories (LCI) for civil works and equipment, taking as starting point the construction project budget and the list of equipment installed at the Girona WWTP, which are the most reliable information sources of materials and resources used during the construction phase. A detailed inventory is conducted by including 45 materials for civil works and 1,240 devices for the equipment. For most of the impact categories and different life spans of the WWTP, the contribution of the construction phase to the overall burden is higher than 5% and, especially for metal depletion, the impact of construction reaches 63%. When comparing to the WWTP inventories available in Ecoinvent the share of construction obtained in this work is about 3 times smaller for climate change and twice higher for metal depletion. Concrete and reinforcing steel are the materials with the highest contribution to the civil works phase and motors, pumps and mobile and transport equipment are also key equipment to consider during life cycle inventories of WWTPs. Additional robust inventories for similar WWTP can leverage this work by applying the factors (kg of materials and energy per m 3 of treated water) and guidance provided. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. Concept, design and equipment of a center for the treatment of radiation accidents at the Staedtisches Krankenhaus Muenchen-Schwabing

    International Nuclear Information System (INIS)

    Bogner, L.; Muehle, P.; Czempiel, H.; Henftling, H.G.

    1987-01-01

    The concept of the treatment center for radiation accidents at the Staedtisches Krankenhaus Muenchen-Schwabing is presented by means of a flow scheme for the treatment of different possible accidents. The resulting design and equipment are discussed in detail. (orig.) [de

  2. Defense Logistics. Preliminary Observations on the Army's Implementation of Its Equipment Reset Strategies

    National Research Council Canada - National Science Library

    Solis, William M

    2007-01-01

    .... In order to provide effective oversight of the Army's implementation of its equipment reset strategies and to plan for future reset initiatives, the Congress needs to be assured that the funds...

  3. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  4. Development of an approach to facilitate optimal equipment replacement : technical summary.

    Science.gov (United States)

    1999-10-01

    The objective of the study was to determine a way or ways to assign an urgency rating to equipment that was currently in service but in need of replacement. This urgency rating must in some manner took into account the various costs associated with r...

  5. Electric arc spraying for restoration and repair of metallurgical equipment parts

    Directory of Open Access Journals (Sweden)

    В’ячеслав Олександрович Роянов

    2016-07-01

    Full Text Available It has been shown that the electric arc spraying with the use of powder wires can be used to repair and restore parts of metallurgical equipment. The technology of spraying parts by means of the cored wire Steelcored M8TUV; T462MMIN5 and combinations of steel and aluminum wires to restore shaft-gears, shaft-beams, cranes axles for the foundry of the Moldavian Metallurgical Plant has been introduced. The composition of the flux-cored wires MMP-2,3 developed at the Department of Equipment and welding production technology of PSTU that provides the required hardness and adhesion of the coating and the substrate have been shown and the results of the coatings properties studies have been published. Studies have shown matching properties of the coatings to be used for details of the metallurgical equipment working under difficult conditions, including the rolls of rolling mills. Cored wire was used for pilot plating of the rolls surface of the skin-rolling stand at the cold-rolling mill at Illich Steel and Iron Works, Mariupol. Residual coating thickness ranged from 15 to 25 microns. Strip sized 0,9 × 1025 mm has been rolled, the squeezing is equal to 0,8...1,0%.

  6. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  7. Monitoring equipment environment during nuclear plant operation at Salem and Hope Creek generating stations

    International Nuclear Information System (INIS)

    Blum, A.; Smith, R.J.

    1991-01-01

    Monitoring of environmental parameters has become a significant issue for operating nuclear power plants. While the long-term benefits of plant life extension programs are being pursued with comprehensive environmental monitoring programs, the potential effect of local hot spots at various plant locations needs to be evaluated for its effect on equipment degradation and shortening of equipment qualified life. A significant benefit can be experienced from temperature monitoring when a margin exists between the design versus actual operating temperature. This margin can be translated into longer equipment qualified life and significant reduction in maintenance activities. At PSE and G, the immediate need for monitoring environmental parameters is being accomplished via the use of a Logic Beach Bitlogger. The Bitlogger is a portable data loggings system consisting of a system base, input modules and a communication software package. Thermocouples are installed on selected electrical equipment and cables are run from the thermocouples to the input module of the Bitlogger. Temperature readings are taken at selected intervals, stored in memory, and downloaded periodically to a PC software program, i.e., Lotus. The data is formatted into tabular or graphical documents. Because of their versatility, Bitloggers are being used differently at the authors Nuclear facility. At the Salem Station (2 Units-4 loop Westinghouse PWR), a battery powered, fully portable, calibrated Bitlogger is located in an accessible area inside Containment where it monitors the temperature of various electrical equipment within the Pressurizer Enclosure. It is planned that close monitoring of the local hot spot temperatures in this area will allow them to adjust and reconcile the environmental qualification of the equipment

  8. Assessing unmet anaesthesia need in Sierra Leone: a secondary ...

    African Journals Online (AJOL)

    Objectives: To determine the unmet anaesthesia need in a low resource region. Introduction: Surgery and anæsthesia services in low- and middle-income countries (LMICs) are under-equipped, under- staffed, and unable to meet current surgical need. There is little objective measure as to the true extent and nature of ...

  9. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  10. Principles of commercially available pretreatment and feeding equipment for baled biomass

    Energy Technology Data Exchange (ETDEWEB)

    Koch, T. [Thomas Koch Energi, Vanloese (Denmark); Hummelshoej, R.M. [COWIconsult, Lyngby (Denmark)

    1993-12-31

    During the last 15 years, there has been a growing interest in utilizing waste biomass for energy production in Denmark. Since 1990, it has been unlawful to burn surplus straw on open land. Before the year 2000, it is intended to utilize most of the 2--3 million tons of surplus straw as an energy resource. The type of plants that were built in the beginning were combustion plants for district heating. The feeding equipment for these plants has been developed to an acceptable standard. Later, combustion plants for combined heat and power production based on a steam turbine were introduced. This type of plant demands a much greater continuity in the fuel flow, and the consequences of minor discontinuities are to be dropped from the grid. Gasification and pyrolysis demands a high sealing ability of the feeding equipment, because of the explosive and poisonous gas in the plant and a need for a very high continuity in the fuel feed. The first plants were built with the equipment and experiences from the farming industries, which have a long tradition in working with biomass-handling. The experiences gained with this type of equipment were not very promising, and in the early eighties, a more industrial type of biomass-handling equipment was developed. This paper presents the principles of the heavy-duty biomass pretreatment and feeding equipment that was commercially available in Denmark in May, 1993.

  11. Football Equipment Removal Improves Chest Compression and Ventilation Efficacy.

    Science.gov (United States)

    Mihalik, Jason P; Lynall, Robert C; Fraser, Melissa A; Decoster, Laura C; De Maio, Valerie J; Patel, Amar P; Swartz, Erik E

    2016-01-01

    Airway access recommendations in potential catastrophic spine injury scenarios advocate for facemask removal, while keeping the helmet and shoulder pads in place for ensuing emergency transport. The anecdotal evidence to support these recommendations assumes that maintaining the helmet and shoulder pads assists inline cervical stabilization and that facial access guarantees adequate airway access. Our objective was to determine the effect of football equipment interference on performing chest compressions and delivering adequate ventilations on patient simulators. We hypothesized that conditions with more football equipment would decrease chest compression and ventilation efficacy. Thirty-two certified athletic trainers were block randomized to participate in six different compression conditions and six different ventilation conditions using human patient simulators. Data for chest compression (mean compression depth, compression rate, percentage of correctly released compressions, and percentage of adequate compressions) and ventilation (total ventilations, mean ventilation volume, and percentage of ventilations delivering adequate volume) conditions were analyzed across all conditions. The fully equipped athlete resulted in the lowest mean compression depth (F5,154 = 22.82; P Emergency medical personnel should remove the helmet and shoulder pads from all football athletes who require cardiopulmonary resuscitation, while maintaining appropriate cervical spine stabilization when injury is suspected. Further research is needed to confirm our findings supporting full equipment removal for chest compression and ventilation delivery.

  12. Research on Integrated Analysis Method for Equipment and Tactics Based on Intervention Strategy Discussion

    Institute of Scientific and Technical Information of China (English)

    陈超; 张迎新; 毛赤龙

    2012-01-01

    As the increase of the complexity of the information warfare,its intervention strategy needs to be designed in an integrated environment.However,the current research always breaks the internal relation between equipment and tactics,and it is difficult to meet the requirements of their integrated analysis.In this paper,the research status quo of the integrated analysis about equipment and tactics is discussed first,some shortages of the current methods are summarized then,and an evolvement mechanism of the integrated analysis for equipment and tactics is given finally.Based on these,a framework of integrated analysis is proposed.This method's effectiveness is validated by an example.

  13. Detailed CFD Modelling of Open Refrigerated Display Cabinets

    Directory of Open Access Journals (Sweden)

    Pedro Dinis Gaspar

    2012-01-01

    Full Text Available A comprehensive and detailed computational fluid dynamics (CFDs modelling of air flow and heat transfer in an open refrigerated display cabinet (ORDC is performed in this study. The physical-mathematical model considers the flow through the internal ducts, across fans and evaporator, and includes the thermal response of food products. The air humidity effect and thermal radiation heat transfer between surfaces are taken into account. Experimental tests were performed to characterize the phenomena near physical extremities and to validate the numerical predictions of air temperature, relative humidity, and velocity. Numerical and experimental results comparison reveals the predictive capabilities of the computational model for the optimized conception and development of this type of equipments. Numerical predictions are used to propose geometrical and functional parametric studies that improve thermal performance of the ORDC and consequently food safety.

  14. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  15. 33 CFR 149.409 - How many fire extinguishers are needed?

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false How many fire extinguishers are needed? 149.409 Section 149.409 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Fire Protection Equipment Firefighting Requirements § 149.409 How many fire extinguishers are needed...

  16. Site investigation equipment developed by Teollisuuden Voima Oy

    International Nuclear Information System (INIS)

    Oehberg, A.

    1991-02-01

    Teollisuuden Voima Oy (TVO) carries out site investigations in Finland for final disposal of nuclear high level waste during 1987-2000. In order to carry out the investigations some essential equipment have been designed and constructed. The biggest insufficiency among different measuring methods was among water sampling and hydraulic testing. There are some common specifications which all of these equipment has to fulfil. The two most important are that they have to be operatable in deep slim boreholes down to 1000 meters depth with 56 mm in diameter. The main purpose of the Hydraulic Testing Unit is to determine hydraulic conductivity in crystalline rock, where water can flow primarily through fractures. In most commonly used configurations, measurement range is from 10 - 11 to 10 - 5 m/s with constant-head method. Although constant-head method is principally used, almost any known hydraulic method is possible with existing hardware. Most functions are controlled by the computer. The whole system is built into an electrically heated trailer. The system consists of inflatable packers, stainless steel rods, pressure transducers and datalogging devices. The maximum number of monitoring sections is seven. In addition to that as many blind sections as is needed to prevent vertical flow in boreholes can be installed. Water sampling is possible either with a double packer method or in conjunction with the hydraulic head monitoring equipment. The first possibility involves using the laboratory trailer and the second one using a separate pumping unit plus the laboratory trailer in a later phase when sampling is to be conducted. In the laboratory trailer there are all the measuring devices needed to control different chemical parameters (pH, Eh, pS, O 2 , conductivity and temperature) during pumping

  17. The Northern regional programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the UK Northern Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. Organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, the final visit just prior to the end of the manufacturers warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details limiting values for the acceptance test measurements are given. In some instances testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  18. Feasibility study on equipment of LLW management business system

    International Nuclear Information System (INIS)

    Shimizu, Takafumi

    2010-01-01

    LLW from university and private company has been kept in their own nuclear facilities in Japan. RANDEC has been studying business system for the treatment and conditioning of LLW before disposal. Reference to proven waste treatment process used in Nuclear Power Plant, it was studied that the appropriate treatment process for the LLW from university and private company. The waste will be collected from the university and private company to a central treatment facility. After operations such as unpacking, classification, compression, incineration and others, the waste will be treated to waste form. Most equipment are adopted by the process technology used in Nuclear Power Plant. But some equipment such as measurement of radio activity and solidification of powder need to be studied for the treatment of LLW from university and private company. (author)

  19. Power levels in office equipment: Measurements of new monitors and personal computers

    International Nuclear Information System (INIS)

    Roberson, Judy A.; Brown, Richard E.; Nordman, Bruce; Webber, Carrie A.; Homan, Gregory H.; Mahajan, Akshay; McWhinney, Marla; Koomey, Jonathan G.

    2002-01-01

    Electronic office equipment has proliferated rapidly over the last twenty years and is projected to continue growing in the future. Efforts to reduce the growth in office equipment energy use have focused on power management to reduce power consumption of electronic devices when not being used for their primary purpose. The EPA ENERGY STAR[registered trademark] program has been instrumental in gaining widespread support for power management in office equipment, and accurate information about the energy used by office equipment in all power levels is important to improving program design and evaluation. This paper presents the results of a field study conducted during 2001 to measure the power levels of new monitors and personal computers. We measured off, on, and low-power levels in about 60 units manufactured since July 2000. The paper summarizes power data collected, explores differences within the sample (e.g., between CRT and LCD monitors), and discusses some issues that arise in m etering office equipment. We also present conclusions to help improve the success of future power management programs.Our findings include a trend among monitor manufacturers to provide a single very low low-power level, and the need to standardize methods for measuring monitor on power, to more accurately estimate the annual energy consumption of office equipment, as well as actual and potential energy savings from power management

  20. Failure Mode and Effect Analysis of Subsea Multiphase Pump Equipment

    Directory of Open Access Journals (Sweden)

    Oluwatoyin Shobowale Kafayat

    2014-07-01

    Full Text Available Finding oil and gas reserves in deep/harsh environment with challenging reservoir and field conditions, subsea multiphase pumping benefits has found its way to provide solutions to these issues. Challenges such as failure issues that are still surging the industry and with the current practice of information hiding, this issues becomes even more difficult to tackle. Although, there are some joint industry projects which are only accessible to its members, still there is a need to have a clear understanding of these equipment groups so as to know which issues to focus attention on. A failure mode and effect analysis (FMEA is a potential first aid in understanding this equipment groups. A survey questionnaire/interview was conducted with the oil and gas operating company and equipment manufacturer based on the literature review. The results indicates that these equipment’s group are similar with its onshore counterpart, but the difference is the robustness built into the equipment internal subsystems for subsea applications. The results from the manufacturer perspectives indicates that Helico-axial multiphase pump have a mean time to failure of more than 10 years, twin-screw and electrical submersible pumps are still struggling with a mean time to failure of less than 5 years.

  1. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  2. A novel approach to collaborative product development in the medical-equipment industry

    OpenAIRE

    Tseng, Kevin C; Chien-Lung, Hsu

    2013-01-01

    In this study, we summarise the requirements for collaborative product development based on our investigation of the differences in the resources and tools that are needed for the various stages of collaborative product development and the needs of system users during these various stages. We proposed a user-oriented approach of collaborative product development for medical equipment and designed a collaborative product development system with the required functionalities to satisfy different...

  3. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  4. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  5. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  6. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  7. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  8. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  9. Modelling the factors influencing the selection of the construction equipment for Indian construction organizations

    Directory of Open Access Journals (Sweden)

    S.V.S. Raja Prasad

    2016-09-01

    Full Text Available The contribution of Indian construction sector to the GDP is approximately 10%. Under new government policy, it is anticipated that $1000 Billion share for exclusively infrastructure segment would be completed within the next few years. Construction sector in developing country like India still depends on labor and the practice of mechanization, adopting to use of versatile construction equipment is not in force. The need for implementing new technologies and automation is essential to improve the quality, safety and efficiency. To meet the challenges ahead the construction, organizations should focus on utilization of machinery/equipment to achieve desirable results. Modern construction is characterized by the increase in utilization of equipment to accomplish numerous construction activities. The selection of construction equipment often affects the required amount of time and effort. It is therefore important for managements of construction organizations and planners to be familiar with the features of various types of equipment commonly used in construction activities. The selection of appropriate equipment is a crucial decision making process as it involves huge capital investment. The purpose of the present study is to develop a model pertaining to the factors influencing the selection of construction equipment by using interpretive structural modelling and the results indicate that productivity and safety are the important factors in selection of equipment in Indian construction organizations.

  10. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  11. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  12. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  13. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  14. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  15. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  16. Unique aspects of downhill ski injuries part 1: epidemiology and equipment.

    Science.gov (United States)

    Buck, P G; Sophocles, A M; Beckenbauch, R D

    1982-03-01

    Skiing is an exciting sport with a significant potential /or serious injury. This potential for injury can be minimized but never entirely eliminated by modern safety equipment.Upper extremity injuries have become relatively more common as the incidence of lower extremity injuries has decreased. Ankle and foot injuries have become infrequent since the advent of the rigid plastic boot, while the incidence of knee injuries has remained essentially constant.Three major mechanisms of injury to the lower extremity include external rotation and abduction, forward fall, and internal rotation. Each mechanism can produce a distinctive set of injured structures.The "skier at risk" is characterized by a lower level of ability, lighter weight, and extremes of age. Injuries can be minimized by purchasing good quality equipment and maintaining it properly; discarding obsolete equipment; using ski brakes, antifriction devices and pistol grip poles; using multirelease bindings for beginners or intermediates; good physical conditioning; taking ski lessons and coupling this with skiing experience; and skiing in control and using common sense on the slopes.Areas which need the most improvement in equipment design include multi-release bindings suitable for all skiers and children's boots. Copyright 2013, SLACK Incorporated.

  17. Study of multi-functional precision optical measuring system for large scale equipment

    Science.gov (United States)

    Jiang, Wei; Lao, Dabao; Zhou, Weihu; Zhang, Wenying; Jiang, Xingjian; Wang, Yongxi

    2017-10-01

    The effective application of high performance measurement technology can greatly improve the large-scale equipment manufacturing ability. Therefore, the geometric parameters measurement, such as size, attitude and position, requires the measurement system with high precision, multi-function, portability and other characteristics. However, the existing measuring instruments, such as laser tracker, total station, photogrammetry system, mostly has single function, station moving and other shortcomings. Laser tracker needs to work with cooperative target, but it can hardly meet the requirement of measurement in extreme environment. Total station is mainly used for outdoor surveying and mapping, it is hard to achieve the demand of accuracy in industrial measurement. Photogrammetry system can achieve a wide range of multi-point measurement, but the measuring range is limited and need to repeatedly move station. The paper presents a non-contact opto-electronic measuring instrument, not only it can work by scanning the measurement path but also measuring the cooperative target by tracking measurement. The system is based on some key technologies, such as absolute distance measurement, two-dimensional angle measurement, automatically target recognition and accurate aiming, precision control, assembly of complex mechanical system and multi-functional 3D visualization software. Among them, the absolute distance measurement module ensures measurement with high accuracy, and the twodimensional angle measuring module provides precision angle measurement. The system is suitable for the case of noncontact measurement of large-scale equipment, it can ensure the quality and performance of large-scale equipment throughout the process of manufacturing and improve the manufacturing ability of large-scale and high-end equipment.

  18. An integrated approach to calculate life cycle costs of arms and military equipment

    OpenAIRE

    SOKOLOVIC VLADA S.; ANDREJIC MARKO D.; LJUBOJEVIC SRDJAN D.

    2013-01-01

    INTRODUCTION In a situation when government expenditures for defense are more restrictive, any investment in the acquisition of arms and military equipment (AME) is a question that does not allow errors in decisions. Accordingly, the economic analysis of the investment must be detailed and unavoidable. In the past, the initial cost of procurement of AME was often the primary, and sometimes the only one criterion in decision-making. Neglecting the analysis of costs throughout the life of asset...

  19. Universal Robot Hand Equipped with Tactile and Joint Torque Sensors: Development and Experiments on Stiffness Control and Object Recognition

    Directory of Open Access Journals (Sweden)

    Hiroyuki NAKAMOTO

    2007-04-01

    Full Text Available Various humanoid robots have been developed and multifunction robot hands which are able to attach those robots like human hand is needed. But a useful robot hand has not been depeveloped, because there are a lot of problems such as control method of many degrees of freedom and processing method of enormous sensor outputs. Realizing such robot hand, we have developed five-finger robot hand. In this paper, the detailed structure of developed robot hand is described. The robot hand we developed has five fingers of multi-joint that is equipped with joint torque sensors and tactile sensors. We report experimental results of a stiffness control with the developed robot hand. Those results show that it is possible to change the stiffness of joints. Moreover we propose an object recognition method with the tactile sensor. The validity of that method is assured by experimental results.

  20. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... An algorithm to retrieve Land Surface Temperature using Landsat-8 Dataset Abstract PDF. ISSN: 2225-8531.

  1. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  2. Comparison between the implementation of quality criteria of radiographic image in conventional and digital mammography equipments

    International Nuclear Information System (INIS)

    Alcantara, M.C.; Sordi, G.M.A.A.; Caldas, L.V.E.; Furquim, T.A.C.

    2008-01-01

    The mammographic examination needs a strict quality control. A publication of the European Commission provides guidelines on quality criteria for the images of the breast, quantifying the quality obtained in the image. Following the recommendations of the European Commission, two kinds of mammographic equipments, at a same institution, were evaluated to compare the quality of the conventional and digital images. Besides of that, the Average Glandular Dose (AGD) and the Entrance Surface Dose (ESD) were measured by using an ionization chamber (Radcal, 6M) in the radiation beams of each equipment. The digital equipment fulfills more quality criteria than the conventional equipment, provided ESD values, AGD values and a rejection index lower than the conventional equipment. Therefore, the digital mammography can be considered more adequate than the conventional one, both for criteria analyses and for dose optimization. (author)

  3. 33 CFR 149.412 - How many fire axes are needed?

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false How many fire axes are needed? 149.412 Section 149.412 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY... Protection Equipment Firefighting Requirements § 149.412 How many fire axes are needed? Each manned deepwater...

  4. Assessment of technical equipment supply in healthcare institutions: example of Almaty

    Directory of Open Access Journals (Sweden)

    Kuralbai K Kurakbayev

    2014-01-01

    Full Text Available Background: The share of healthcare-related expenditure in the Gross Domestic Product of Kazakhstan is relatively small, and it is strategically important to restructure budgetary expenses in favor of healthcare with simultaneous redistribution of resources in accordance with changing demands and prioritization of high-quality medical care. The aim of this study was to analyze resource provision to healthcare organizations in Kazakhstan and its structure and level assessment. Materials and Methods: The study is based on a comparative assessment of technical and technological equipment of medical institutions in Almaty, Kazakhstan. We analyzed the scope and structure of the financial component of the resource base in Almaty. We carried out information processing and analysis methods, content analysis, mathematical treatment, as well as conducted case studies. Also, we held opinion poll among medical staff (specialists, managerial staff (n = 300 P for trend < 0.001 and patients (n = 210 P for trend < 0.001. Results: About 18.8% of patients do not receive medical care because of defects of the equipment, whereas 19.9% of patients claim that the reason of refusal of the provision of medical services is an equipment overload. Conclusion: Most of the respondents referred to on poor technical equipment, mismatch with the world standards of performance and competitiveness. Lack of advanced medical technology, inadequate financing, insufficient supply of domestic medical equipment, and inadequate procurement by tender were also noted. The obtained data point to the need for optimization and upgrading medical equipment at various levels of healthcare.

  5. RATIONAL RECOVERY MODEL OF DEPOT PROCESSING EQUIPMENT AT THE INDUSTRIAL ENTERPRISE

    Directory of Open Access Journals (Sweden)

    M. I. Kapitsa

    2014-07-01

    Full Text Available Purpose. The problem of the maximum resources recovery of rolling stock repair depot of industrial enterprise with limited resources consumption, which are used in the system is today’s topical question.The main factors that affect the repair depot operation of industrial enterprise are reviewed. The most significant factors, affecting the quality of the repair depot, are emphasized for further study, specifically - the state of the major repair equipment of a sector. There is a need to minimize the impact of the unsatisfactory state of this factor. Methodology. The formed task of major equipment rational repairing in the mathematical sense is based on the solution of a vector optimization problem. In this case the target functions are the monetary funds spending and time expenditure for repairing. Findings. The mathematical model of optimal equipment maintainability of the repair department at the industrial enterprise was developed by the authors. On the example the choice model of optimal path for equipment repairing of enterprise repair department is described. Originality. As a result of the conducted research the repairing system of major equipment of industrial enterprise sectors was improved. As the mathematical model of rational system recovery of industrial enterprise repair depot we recommend apparatus of class problems of vector optimization. Practical value. Using the proposed model of major equipment repair system of the repair depot at the industrial enterprise will improve the quality of the department by increasing the efficiency of primary resources - time and monetary funds - which are spent by the sector in order to repair its techniques.

  6. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  7. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  8. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  9. Consideration of demand rate in overall equipment effetiveness (OEE on equipment with constant process time

    Directory of Open Access Journals (Sweden)

    Perumal Puvanasvaran

    2013-06-01

    Full Text Available Purpose: The paper is primarily done on the purpose of introducing new concept in defining the Overall Equipment Effectiveness (OEE with the consideration of both machine utilization and customer demand requested. Previous literature concerning the limitation and difficulty of OEE implementation has been investigated in order to track out the potential opportunities to be improved, since the OEE has been widely accepted by most of the industries regardless their manufacturing environment.Design/methodology/approach: The paper is conducting the study based on literature review and the computerized data collection. In details, the novel definition and method of processing the computerized data are all interpreted based on similar studies performed by others and supported by related journals in proving the validation of the output. Over the things, the computerized data are the product amount and total time elapsed on each production which is automatically recorded by the system at the manufacturing site.Findings: The finding of this paper is firstly the exposure and emphasis of limitation exists in current implementation of OEE, which showing that high utilization of the machine is encouraged regardless of the customer demand and is having conflict with the inventory handling cost. This is certainly obvious with overproduction issue especially during low customer demand period. The second limitation in general implementation of OEE is the difficulty in obtaining the ideal cycle time, especially those equipments with constant process time. The section of this paper afterward comes out with the proposed solution in fixing this problem through the definition of performance ratio and then usage of this definition in measuring the machine utilization from time to time. Before this, the time available for the production is calculated incorporating the availability of OEE, which is then used to get the Takt time.Research limitations/implications: Future

  10. Main: Clone Detail [KOME

    Lifescience Database Archive (English)

    Full Text Available Clone Detail Mapping Pseudomolecule data detail Detail information Mapping to the T...IGR japonica Pseudomolecules kome_mapping_pseudomolecule_data_detail.zip kome_mapping_pseudomolecule_data_detail ...

  11. Automated leak localization performance without detailed demand distribution data

    NARCIS (Netherlands)

    Moors, Janneke; Scholten, L.; van der Hoek, J.P.; den Besten, J.

    2018-01-01

    Automatic leak localization has been suggested to reduce the time and personnel efforts needed to localize
    (small) leaks. Yet, the available methods require a detailed demand distribution model for successful
    calibration and good leak localization performance. The main aim of this work was

  12. Author Details

    African Journals Online (AJOL)

    PROMOTING ACCESS TO AFRICAN RESEARCH. AFRICAN JOURNALS ONLINE (AJOL) · Journals · Advanced Search · USING AJOL · RESOURCES. Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads.

  13. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  14. Annual report of the group for maintenance of electronic equipment

    International Nuclear Information System (INIS)

    Popovic, B.

    1965-01-01

    Maintenance and repair of the RA reactor control and safety systems were uniformly distributed during the whole year and were done according to the annual plan. A series of repairs of he electronic equipment as well as exchange of electronic components and elec tonic tubes. The testing and calibration of control and protection circuits were done regularly according to the needs and operation state of the reactor and according to the instructions. Inspections, repairs and reconstructions well as operating characteristics of individual elements as well as complete electronic circuits during 1965 have shown da the systems of control and safety are still in good condition. Somewhat higher number of failures due to aging of electronic tubes is a regular consequence of equipment and instrumentation aging [sr

  15. A Study on Performance and Safety Tests of Electrosurgical Equipment.

    Science.gov (United States)

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2016-09-01

    Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  16. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  17. TU-G-213-02: IEC Subcommittee 62B (Diagnostic Imaging Equipment): Recent and Active Projects

    International Nuclear Information System (INIS)

    Supanich, M.

    2015-01-01

    The International Electrotechnical Commission (IEC) writes standards that manufacturers of electrical equipment must comply with. Medical electrical equipment, such as medical imaging, radiation therapy, and radiation dosimetry devices, fall under Technical Committee 62. Of particular interest to medical physicists are the standards developed within Subcommittees (SC) 62B, which addresses diagnostic radiological imaging equipment, and 62C, which addresses equipment for radiation therapy, nuclear medicine and dosimetry. For example, a Working Group of SC 62B is responsible for safety and quality assurance standards for CT scanners and a Working Group of SC 62C is responsible for standards that set requirements for dosimetric safety and accuracy of linacs and proton accelerators. IEC standards thus have an impact on every aspect of a medical physicist’s job, including equipment testing, shielding design, room layout, and workflow. Consequently, it is imperative that US medical physicists know about existing standards, as well as have input on those under development or undergoing revision. The structure of the IEC and current standards development work will be described in detail. The presentation will explain how US medical physicists can learn about IEC standards and contribute to their development. Learning Objectives: Learn about the structure of the IEC and the influence that IEC standards have on the design of equipment for radiology and radiation therapy. Learn about the mechanisms by which the US participates in the development and revision of standards. Understand the specific requirements of several standards having direct relevance to diagnostic and radiation therapy physicists

  18. TU-G-213-02: IEC Subcommittee 62B (Diagnostic Imaging Equipment): Recent and Active Projects

    Energy Technology Data Exchange (ETDEWEB)

    Supanich, M. [Rush University Medical Center (United States)

    2015-06-15

    The International Electrotechnical Commission (IEC) writes standards that manufacturers of electrical equipment must comply with. Medical electrical equipment, such as medical imaging, radiation therapy, and radiation dosimetry devices, fall under Technical Committee 62. Of particular interest to medical physicists are the standards developed within Subcommittees (SC) 62B, which addresses diagnostic radiological imaging equipment, and 62C, which addresses equipment for radiation therapy, nuclear medicine and dosimetry. For example, a Working Group of SC 62B is responsible for safety and quality assurance standards for CT scanners and a Working Group of SC 62C is responsible for standards that set requirements for dosimetric safety and accuracy of linacs and proton accelerators. IEC standards thus have an impact on every aspect of a medical physicist’s job, including equipment testing, shielding design, room layout, and workflow. Consequently, it is imperative that US medical physicists know about existing standards, as well as have input on those under development or undergoing revision. The structure of the IEC and current standards development work will be described in detail. The presentation will explain how US medical physicists can learn about IEC standards and contribute to their development. Learning Objectives: Learn about the structure of the IEC and the influence that IEC standards have on the design of equipment for radiology and radiation therapy. Learn about the mechanisms by which the US participates in the development and revision of standards. Understand the specific requirements of several standards having direct relevance to diagnostic and radiation therapy physicists.

  19. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  20. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  1. Noise control of radiological monitoring equipment

    International Nuclear Information System (INIS)

    Rubick, R.D.; Stevens, W.W.; Burke, L.L.

    1998-01-01

    Although vacuum pumps on continuous air monitors (CAMs) do not produce noise levels above regulatory limits, engineering controls were used to establish a safer work environment. Operations performed in areas where CAMs are located are highly specialized and require precision work when handling nuclear materials, heavy metals, and inert gases. Traditional methods for controlling noise such as enclosing or isolating the source and the use of personal protection equipment were evaluated. An innovative solution was found by retrofitting CAMs with air powered multistage ejectors pumps. By allowing the air to expand in several chambers to create a vacuum, one can eliminate the noise hazard altogether. In facilities with adequate pressurized air, use of these improved ejector pumps may be a cost-effective replacement for noisy vacuum pumps. A workplace designed or engineered with noise levels as low as possible or as close to background adds to increased concentration, attention to detail, and increased production

  2. Preserving EQ as per CSA N290.13: EQ of equipment for CANDU NPP

    International Nuclear Information System (INIS)

    Bordeleau, H.

    2006-01-01

    EQ is basically a Quality Assurance process that ensures that required safety related equipment will performed their safety functions during accident generating harsh environmental condition. As any good Quality Assurance Program, EQ activities have to be imbedded in the normal tasks of the people at the plant in such a way that it is not an extra concern but part of the things to be assessed and done on a regular basis so that the EQ Status of the equipment will not be compromised. The experience shows us that even with brand new plants there are discrepancies between equipment designed to be installed and that installed (wrong model or wrong instrument). Improper installation was also found. To eliminate these mistakes it is recommended to have a thorough initial inspection during construction or commissioning and later at regular intervals during operation. To avoid new mistakes during maintenance, crews have to be properly qualified and trained on completed procedure with appropriate work report that will required to be scrutinized for possible common cause failure and OPEX report. Procurement and handling of equipment and spare parts require a thorough revision of procurement and storage practices to guarantee proper storage, availability and identification of equipment for EQ replacement. A shelf life program for degradable material shall be implemented. Condition monitoring program could be use to extend life of equipment or as a qualification methods, caution should be use to look very precisely to the critical parameters that need to be monitored and to carefully tailor the monitoring program. EQ program should also consider barriers, they are not EQ equipment; it is usually made out of non-ageing material like metal or concrete. But there could be sealing material used in conjunction with the barriers and these may need special care. The impact of EQ parameters changes related to services conditions, new technical data or condition monitoring has to be

  3. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  4. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  5. Commercial equipment loads: End-Use Load and Consumer Assessment Program (ELCAP)

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, R.G.; Williamson, M.A.; Richman, E.E.; Miller, N.E.

    1990-07-01

    The Office of Energy Resources of the Bonneville Power Administration is generally responsible for the agency's power and conservation resource planning. As associated responsibility which supports a variety of office functions is the analysis of historical trends in and determinants of energy consumption. The Office of Energy Resources' End-Use Research Section operates a comprehensive data collection program to provide pertinent information to support demand-side planning, load forecasting, and demand-side program development and delivery. Part of this on-going program is known as the End-Use Load and Consumer Assessment Program (ELCAP), an effort designed to collect electricity usage data through direct monitoring of end-use loads in buildings. This program is conducted for Bonneville by the Pacific Northwest Laboratory. This report provides detailed information on electricity consumption of miscellaneous equipment from the commercial portion of ELCAP. Miscellaneous equipment includes all commercial end-uses except heating, ventilating, air conditioning, and central lighting systems. Some examples of end-uses covered in this report are office equipment, computers, task lighting, refrigeration, and food preparation. Electricity consumption estimates, in kilowatt-hours per square food per year, are provided for each end-use by building type. The following types of buildings are covered: office, retail, restaurant, grocery, warehouse, school, university, and hotel/motel. 6 refs., 35 figs., 12 tabs.

  6. How should low-contrast detail detectability be measured in fluoroscopy?

    International Nuclear Information System (INIS)

    Tapiovaara, Markku J.; Sandborg, Michael

    2004-01-01

    The relationship and precision of four methods for measuring the low-contrast detail detectability in fluoroscopic imaging were studied. These included the physical measurement of the accumulation rate of the square of the signal-to-noise ratio (SNR rate 2 ), two-alternative forced-choice (2-AFC) experiments, sixteen-alternative forced-choice (16-AFC) experiments and subjective determination of the threshold contrast. The precision and sensitivity of the threshold contrast measurement were seen to be modest in the constancy testing of fluoroscopic equipment: only large changes in system performance could be reliably detected by that method. The measurement of the SNR rate 2 is suggested instead. The relationship between the results of the various methods were studied, and it was found that human performance can be related to SNR rate 2 by introducing the concept of the effective image information integration time (t eff ). When measured for an unlimited observation time, it depicts the saturation of human performance in detecting a static low-contrast detail in dynamic image noise. Here, t eff was found to be about 0.6 s in 2-AFC tests and 0.3 s in 16-AFC tests

  7. Market study on the Mexican market for electrical distribution equipment

    International Nuclear Information System (INIS)

    1991-01-01

    A brief historical survey of the development of the Mexican electric power sector is presented, along with an overview of the state of the Mexican economy since the late 1980s and the present characteristics of the Mexican electricity sector. The Mexican market for electric power generation and distribution equipment is then assessed, from the perspective of Canadian suppliers and manufacturers intending to enter this market. Projected consumption of electrical generation and distribution equipment in Mexico for 1994 is estimated at US$1,035,600,000 ($719.4 million in production, $356.9 million in imports, and $40.7 million in exports). This market increased 12.3% in 1990, and since power demand in Mexico has been growing faster than growth in capacity, it is possible that investments in the electricity sector will grow at faster rates. Items which are traditionally imported include nuclear reactors and related equipment, boilers, turbines, power breakers, valves, coal and ash handling equipment, relays, automatic controls, and chemical treatment equipment. The USA has the greatest share of the import market with 35%, followed by Japan (22%), Switzerland (18%), and Germany (13%). Canadian exports have concentrated on distribution equipment and only totalled $1.7 million in 1990. Electricity is distributed to some 16.6 million users over a national interconnected system having total installed capacity of 30,513 MW in 1991. There are plans to increase capacity by 9.7 GW by 1994 and another 37.4-47.8 GW between 1995 and 2010. Projections of electricity needs by region are listed along with the new power plants targeted for investment. Market liberalization and lowering of tariffs have made the Mexican market more accessible to exporters. 8 tabs

  8. TMI-2 [Three Mile Island Nuclear Power Station] fuel canister and core sample handling equipment used in INEL hot cells

    International Nuclear Information System (INIS)

    McConnell, J.W. Jr.; Shurtliff, W.T.; Lynch, R.J.; Croft, K.M.; Whitmill, L.J.; Allen, S.M.

    1987-01-01

    This paper describes the specialized remote handling equipment developed and used at the Idaho National Engineering Laboratory (INEL) to handle samples obtained from the core of the damaged Unit 2 reactor at Three Mile Island Nuclear Power Station (TM-2). Samples of the core were removed, placed in TMI-2 fuel canisters, and transported to the INEL. Those samples will be examined as part of the analysis of the TMI-2 accident. The equipment described herein was designed for removing sample materials from the fuel canisters, assisting with initial examination, and processing samples in preparation for detailed examinations. The more complex equipment used microprocessor remote controls with electric motor drives providing the required force and motion capabilities. The remaining components were unpowered and manipulator assisted

  9. NATO ARI on Ergonomic Data for Equipment Design

    CERN Document Server

    1984-01-01

    For many years ergonomists and human engineering specialists have made significant contributions to the solution of problems faced in the area of human labour and to the introduction of their research results and field experience into the process of equipment design. However, the rapid increase in complexity of equipment in use as well as in development demonstrates the necessity of broaden­ ing the point of view continuously. The workshop held in Munich from March 22nd to March 26th, 1982, was an excellent opportunity for the participants to discuss their respective interests and their interpretation of needs for future research. The workshop was sponsored by the Human Factors Special Programme Panel of the Scientific Affairs Division of NATO. This sponsorship, together with the helpful assistance rendered by Drs. Bayraktar, Kroemer, and Sanders, is gratefully acknowledged. This volume contains the papers presented during the workshop. All these papers are directly related to the general aim: the ex­ chang...

  10. EPRI spearheads generic PM recommendations for infrastructure equipment

    International Nuclear Information System (INIS)

    Worledge, David H.; Hinchcliffe, Glenn R.; Benak, Mark S.; Bridges, Martin

    2007-01-01

    All companies have at their core a vast amount of similar equipment that would benefit from solid preventive maintenance (PM) recommendations that are generic and easily adapted to meet operational conditions. The re-emergence of PM optimization methods like Reliability Centered Maintenance, further illustrates that companies in all industries recognize the positive influence that a well-focused maintenance program has on the corporate bottom line. The Electric Power Research Institute (EPRI) has long been a leader in providing universally adaptable maintenance solutions to meet the evolving needs of its membership. Nearly ten years ago, EPRI began developing the PM Basis Database, a one-of-a-kind repository of PM recommendations for basic infrastructure components (such as pumps, motors, valves, compressors), derived from equipment experts. EPRI has now made available this comprehensive body of knowledge to all industries. This paper will explore the origins and structure of the database, how these generic PM recommendations benefit every industry, and how they may be obtained. (author)

  11. Grid-connected photovoltaic power systems: survey of inverter and related protection equipments

    Energy Technology Data Exchange (ETDEWEB)

    Ishikawa, T

    2002-12-15

    This report for the International Energy Agency (IEA) made by Task 5 of the Photovoltaic Power Systems (PVPS) programme reports on a survey made on inverter and related protection equipment. The mission of the Photovoltaic Power Systems Programme is to enhance the international collaboration efforts which accelerate the development and deployment of photovoltaic solar energy. Task 5 deals with issues concerning grid-interconnection and distributed PV power systems. This report summarises the data obtained from survey of recent inverter technology and inverter protection equipment for grid interconnected PV systems. The results are based on the surveys using a questionnaire to identify the current status of grid-interconnection inverters. This report is to serve as a reference for those interested in installing grid-connected PV systems, electric utility company personnel, manufacturers and researchers. The results of the survey are presented and discussed. Technical and financial data is reviewed and two appendices provide details on the results obtained and those institutions involved in the survey.

  12. Guidance, navigation, and control subsystem equipment selection algorithm using expert system methods

    Science.gov (United States)

    Allen, Cheryl L.

    1991-01-01

    Enhanced engineering tools can be obtained through the integration of expert system methodologies and existing design software. The application of these methodologies to the spacecraft design and cost model (SDCM) software provides an improved technique for the selection of hardware for unmanned spacecraft subsystem design. The knowledge engineering system (KES) expert system development tool was used to implement a smarter equipment section algorithm than that which is currently achievable through the use of a standard data base system. The guidance, navigation, and control subsystems of the SDCM software was chosen as the initial subsystem for implementation. The portions of the SDCM code which compute the selection criteria and constraints remain intact, and the expert system equipment selection algorithm is embedded within this existing code. The architecture of this new methodology is described and its implementation is reported. The project background and a brief overview of the expert system is described, and once the details of the design are characterized, an example of its implementation is demonstrated.

  13. The Northern Regional Programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. The organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, and the final visit just prior to the end of the manufacturer's warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first visit. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details of the limiting values for the acceptance test measurements are given. The results of the programme are discussed. In some instances the testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  14. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  15. Furnace and support equipment for space processing. [space manufacturing - Czochralski method

    Science.gov (United States)

    Mazelsky, R.; Duncan, C. S.; Seidensticker, R. G.; Johnson, R. A.; Hopkins, R. H.; Roland, G. W.

    1975-01-01

    A core facility capable of performing a majority of materials processing experiments is discussed. Experiment classes are described, the needs peculiar to each experiment type are outlined, and projected facility requirements to perform the experiments are treated. Control equipment (automatic control) and variations of the Czochralski method for use in space are discussed.

  16. A Perspective on Equipment Design for Fusion Remote Handling

    International Nuclear Information System (INIS)

    Mills, S.; Haist, B.; Hamilton, D.

    2006-01-01

    basis. To foresee and therefore prevent equipment failure technologies such as online condition monitoring and self-diagnosis will be essential. The economics of future fusion projects will demand that commercial off-the-shelf equipment be used in the remote handling system wherever possible and that the integration and support of the systems are as simple as possible. The modularization and standardisation of components and software is therefore essential. The paper will discuss possible methods for addressing these needs of the preparation, maintenance and support of remote operations. If ignored, this aspect has significant potential to inflate costs and reduce operational effectiveness. The paper will also discuss innovations and developments which have the potential for improving some of the key technologies required for fusion machines such as in pipe joining techniques and actuator developments. (author)

  17. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  18. Author Details

    African Journals Online (AJOL)

    An Overview of Africa's Marine Resources: Their Utilization and Sustainable Management Details · Vol 12, No 3 (2000) - Articles EDITORIAL Ganoderma Lucidum - Paramount among Medicinal Mushrooms. Details · Vol 15, No 3 (2003) - Articles Editorial: Africa's Mushrooms: A neglected bioresource whose time has come

  19. Procurement of medical equipment in Sweden

    Directory of Open Access Journals (Sweden)

    Heikki Terio

    2010-02-01

    Full Text Available In many hospitals in Sweden the importance of technology management is already accepted and accepted since the hospital managements have recognised that technology is an integral part of all major policy and planning decisions. Today’s medical devices are technically complex and sometimes a system of interacting devices is required to achieve the desired clinical function. If the hospitals want to use the latest, modern technology, then they need to make substantial investments in both equipment and competence. Complex technology, large investments and need of highly qualii ed personnel to handle the medical devices are factors that indicate a need of well-dei ned procurement process as an essential part of the total health technology management system that should be used in a hospital. In such a procurement process, carefully prepared planning of technology investments can reduce the running costs and costs for maintenance substantially. In addition, a well-dei ned procurement process contributes to increase the patient safety. In Karolinska University Hospital goods and services are purchased for more than 20% of the hospital’s €1.2 billion turnover. It is therefore very important that the procurement is carried out ef ectively.

  20. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  1. STS-102 Onboard Photograph-The Payload Equipment Restraint System

    Science.gov (United States)

    2001-01-01

    In this Space Shuttle STS-102 mission image, the Payload Equipment Restraint System H-Strap is shown at the left side of the U.S. Laboratory hatch and behind Astronaut James D. Weatherbee, mission specialist. PERS is an integrated modular system of components designed to assist the crew of the International Space Station (ISS) in restraining and carrying necessary payload equipment and tools in a microgravity environment. The Operations Development Group, Flight Projects Directorate at the Marshall Space Flight Center (MSFC), while providing operation support to the ISS Materials Science Research Facility (MSRF), recognized the need for an on-orbit restraint system to facilitate control of lose objects, payloads, and tools. The PERS is the offspring of that need and it helps the ISS crew manage tools and rack components that would otherwise float away in the near-zero gravity environment aboard the Space Station. The system combines Kevlar straps, mesh pockets, Velcro and a variety of cornecting devices into a portable, adjustable system. The system includes the Single Strap, the H-Strap, the Belly Pack, the Laptop Restraint Belt, and the Tool Page Case. The Single Strap and the H-Strap were flown on this mission. The PERS concept was developed by industrial design students at Auburn University and the MSFC Flight Projects Directorate.

  2. Dynamic characteristics of lead rubber bearings with dynamic two-dimensional test equipment

    International Nuclear Information System (INIS)

    Ohtori, Y.; Ishida, K.; Mazda, T.

    1994-01-01

    Although studies have previously been done on the static mechanical properties of lead rubber bearings, this study aims to grasp the dynamic characteristics of lead rubber bearings from experimental results, using two-dimensional dynamic test equipment which is designed to grasp in detail such dynamic characteristics as deformation capacity and proof stress. This paper describes the results from three types of tests: (1) dynamic mechanical properties tests, (2) cyclic loading tests, and (3) dynamic ultimate tests. Through these tests, it was confirmed that the dynamic characteristics of lead rubber bearings are independent of strain rate

  3. Attribute measurement systems prototypes and equipment in the United States

    International Nuclear Information System (INIS)

    Langner, D.C.; Landry, R.P.; Hsue, S.-T.; MacArthur, D.W.; Mayo, D.R.; Smith, M.K.; Nicholas, N.J.; Whiteson, R.

    2001-01-01

    Since the fall of 1997, the United States has been developing prototypical attribute verification technology for potential use by the International Atomic Energy Agency (IAEA) under the Trilateral Initiative. The first attribute measurement equipment demonstration took place in December 1997 at the Lawrence Livermore National Laboratory. This demonstration led to a series of joint Russian Federatioin/US/IAEA technical discussions that focused on attribute measurement technology that could be applied to plutonium bearing items having classified characteristics. A first prototype attribute verification system with an information barrier was demonstrated at a Trilateral Technical Workshop in June 1999 at Los Alamos. This prototype nourished further fruitful discussions between the three parties that has in turn led to the documents discussed in a previous paper. Prototype development has continued in the US, under other initiatives, using an integrated approach that includes the Trilatleral Initiative. Specifically for the Trilateral Initiative, US development has turned to some peripheral equipment that would support verifications by the IAEA. This equipment includes an authentication tool for measurement systems with information barriers and in situ probes that would facilitate inspections by reducing the need to move material out of storage locations for reverification. In this paper, we will first summarize the development of attribute verification measurement system technology in the US and then report on the status of the development of other equipment to support the Trilateral Initiative.

  4. Overall equipment effectiveness: application in a company in the drinks Manaus industrial sector

    Directory of Open Access Journals (Sweden)

    Cristiane Fátima Cavalcante Raposo

    2011-09-01

    Full Text Available The Overall Equipment Effectiveness (OEE is an indicator used as a management and continuous improvement of machinery and equipment, useful to identify losses, thus reducing production costs. In order to examine in more detail the application of OEE in the production system of a company in the beverage industry of the Industrial Pole of Manaus, was performed by means of literature search and descriptive, and using the case study method, a remark in the production system of the company Alfa, in the period from January to November 2008. The results from this research show the application of OEE in eleven steps, the statistical analysis of the results of this indicator shows a positive trend in the initial stage because of the improvements achieved in the production system through actions for elimination / reduction of losses, revealing that the manager can make improvements that may be necessary.

  5. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  6. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  7. Radiometer evaluation of X-rays equipment in the region of Aracatuba, Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Fernandes, Marco A.R.

    2009-01-01

    This paper presents the basic concepts of radiation protection to guide the health care professionals who use equipment emitting ionizing radiation on the correct handling of the beams of radiation. Radiometric evaluations were conducted in 1665 in X-ray equipment, installed in dental surgeries and clinics, hospitals and radiology services, during the years 1996 to 2003 in the region of Aracatuba. Tests of radiometry are presented as a technical report where the parameters are quantified physical and radiological verifying its compliance with the established by legislation. The distribution of reports by type of unit shows that the vast majority of equipment is of periapical dental x-rays (72%), 25% of equipment is medical equipment for radiology and 3% is dental equipment panoramic model (orthodontic documentation). Among the physical parameters analyzed, the length of the browser was showing more variance compared to the required by law, this fact may also contribute to gaps in the rate of the radiation dose and the size of field in the skin of the patient, the that can easily be resolved simply to replace the piece at the outlet of the head. During the completion of visits to services, it also noted a gap in the training of professionals who operate this equipment emitting radiation, warning of the need for specific training in the area. (author)

  8. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  9. Gameplay as a Source of Intrinsic Motivation for Individuals in Need of Ankle Training or Rehabilitation

    DEFF Research Database (Denmark)

    Nilsson, Niels Christian; Serafin, Stefania; Nordahl, Rolf

    2012-01-01

    Injuries to the ankle may be a source of great discomfort and the long-term effects can negatively influence the future health of the individual who has suffered the injury. Wobble boards represent a relatively inexpensive type of equipment that may be used to train one’s ankles preventively...... or as part of the rehabilitation process once the damage has been done. However, individuals in need of such training frequently lack the motivation necessary in order to successfully complete the training or rehabilitation process. This paper details the design and implementation of a prototype intended...... to alleviate this problem by leveraging games’ potential as a source of intrinsic motivation. More specifically, the prototype enables users to control a game by means of a wobble board, thus allowing them to perform the necessary exercises while playing. An expert on ankle rehabilitation assessed the efficacy...

  10. Author Details

    African Journals Online (AJOL)

    Samuel, TM. Vol 6, No 2 (2006) - Articles Model Development for Economic Replacement of Equipment in a Depressed Economy Abstract · Vol 8 (2008) - Articles Comparison of physical workload in four Gari-frying working postures in Nigeria Abstract · Vol 8 (2008) - Articles Preliminary study of the ergonomics of Gari frying

  11. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  12. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  13. Author Details

    African Journals Online (AJOL)

    Petrology of the Cenomanian Upper Member of the Mamfe Embayment, southwestern Cameroon Details · Vol 38, No 1 (2002) - Articles Sequence stratigraphy of Iso field, western onshore Niger Delta, Nigeria Details · Vol 39, No 2 (2003) - Articles Preliminary studies on the lithostratigraphy and depositional environment of ...

  14. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  15. Wooden houses in detail. Holzhaeuser im Detail

    Energy Technology Data Exchange (ETDEWEB)

    Ruske, W. (ed.)

    1986-01-01

    Under the serial title 'Planning and construction of wooden houses', WEKA will publish a number of books of which this is the first. Details of design and construction are presented, e.g.: Details of modern one-family houses; Fundamentals of design and hints for planning of wooden houses and compact wooden structures; Constructional ecology, wood protection, thermal insulation, sound insulation; Modular systems for domestic buildings; The 'bookshelf-type' house at the Berlin International Construction Exhibition (IBA); Experience with do-it-yourself systems. With 439 figs.

  16. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  17. Research on multi - channel interactive virtual assembly system for power equipment under the “VR+” era

    Science.gov (United States)

    Ren, Yilong; Duan, Xitong; Wu, Lei; He, Jin; Xu, Wu

    2017-06-01

    With the development of the “VR+” era, the traditional virtual assembly system of power equipment has been unable to satisfy our growing needs. In this paper, based on the analysis of the traditional virtual assembly system of electric power equipment and the application of VR technology in the virtual assembly system of electric power equipment in our country, this paper puts forward the scheme of establishing the virtual assembly system of power equipment: At first, we should obtain the information of power equipment, then we should using OpenGL and multi texture technology to build 3D solid graphics library. After the completion of three-dimensional modeling, we can use the dynamic link library DLL package three-dimensional solid graphics generation program to realize the modularization of power equipment model library and power equipment model library generated hidden algorithm. After the establishment of 3D power equipment model database, we set up the virtual assembly system of 3D power equipment to separate the assembly operation of the power equipment from the space. At the same time, aiming at the deficiency of the traditional gesture recognition algorithm, we propose a gesture recognition algorithm based on improved PSO algorithm for BP neural network data glove. Finally, the virtual assembly system of power equipment can really achieve multi-channel interaction function.

  18. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  19. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  20. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1988-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  1. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1990-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  2. Report of the electric Equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1987-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  3. Report of the electric equipment Service - Annex E; Prilog E - Izvestaj o radu sluzbe elektro-opreme

    Energy Technology Data Exchange (ETDEWEB)

    Sanovic, V; Stamenkovic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1983-12-15

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. [Serbo-Croat] Ovaj izvestaj opisuje organizaciju rada Sluzbe za kontrolu i odrzavanje elektro-opreme i sadrzi detaljne podatke o potrosnji elektricne energije, smetnjama u napajanju elektricnom energijom, kvarovima u proteklom periodu.

  4. IEEE recommended practices for seismic qualification of Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The IEEE has developed this document to provide direction for developing programs to seismically qualify Class 1E equipment for nuclear power generating stations. It supplements IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, which describes the basic requirements for equipment qualification. The Class 1E equipment to be qualified by produres or standards established by this document are of many forms, characteristics, and materials; therefore, the document presents many acceptable methods with the intent of permitting the user to make a judicious selection from among the various options. In making such a selection, the user should choose those that best meet a particular equipment's requirements. Further, in using this document as a specification for the purchase of equipment, the many options should also be recognized and the document invoked accordingly. It is recommended that the need for specific standards for the seismic qualifiction of particular kinds of equipment be evaluated by those responsible for such documents and that consideration be given to the application of particular methods from these documents which are most suitable

  5. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Singh, J. Vol 3, No 2 (2011) - Articles Plane waves in a rotating generalized thermo-elastic solid with voids. Abstract PDF. ISSN: 2141-2839. AJOL African Journals Online. HOW TO USE AJOL.

  6. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Vol 12 (2008) - Articles On the wave equations of shallow water with rough bottom topography. Abstract · Vol 14 (2009) - Articles Energy generation in a plant due to variable sunlight intensity

  7. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Vol 45 (2016) - Articles From vectors to waves and streams: An alternative approach to semantic maps1. Abstract PDF · Vol 48 (2017) - Articles Introduction: 'n Klein ietsie for Johan Oosthuizen

  8. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... to blast loadings. Abstract PDF · Vol 9, No 3S (2017): Special Issue - Articles Experimental and numerical investigation on blast wave propagation in soil structure. Abstract PDF. ISSN: 1112-9867.

  9. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  10. Annual report of the group for maintenance of electrical equipment; Godisnji izvestaj elektro grupe

    Energy Technology Data Exchange (ETDEWEB)

    Rajic, M [Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1965-12-15

    This report includes detailed description of repairs and revisions of the electrical equipment of the RA reactor which were done according to the annual plan during the periods when reactor was not operated. Unplanned repairs are part of this report as well. [Serbo-Croat] Ovaj izvestaj sadrzi detaljan opis remontnih i revizionih radova na elektroopremi reaktora RA izvrsenih prema godisnjem planu u periodima kada reaktor nije radio. Vanplanski poslovi ukljucujuci popravke elektroopreme su takodje deo ovog izvestaja.

  11. Possible alternatives for diesel powered mobile equipment for the conditions of deep mines

    Energy Technology Data Exchange (ETDEWEB)

    Paraszczak, J.; Kotersi, O [Laval Univ., Quebec City, PQ (Canada). Dept. of Mining, Metallurgical and Materials Engineering

    2008-07-01

    The challenges associated with mining at considerable depths were discussed. Mines such as Kidd Creek, LaRonde and Creighton are deeper than 2500 m. High rock temperature is among the challenges that operators face in such conditions. Conventional diesel powered load-hauling equipment constitute an additional source of heat and noxious gases. As such, more intense ventilation is needed in order to keep ambient temperature and air quality at a level that is acceptable for human workers. This paper examined possible alternatives for diesel powered equipment, including those that are commercially available as well as those that are underdevelopment or in the prototype stage. The equipment was reviewed with reference to the required infrastructure, stage of technology development and progress. The flexibility, practicality and economic viability of the equipment was also investigated. The potential for its use in deep Canadian mines was discussed along with the most promising drive alternatives for vehicles designed for deep mine operations. Electric drives have proven to be effective in many mining applications since they have significant advantages over diesel drives. The characteristics of cable powered equipment, trolley-wire powered equipment, and battery powered equipment were described. The key advantages and disadvantages of hybrid diesel electric equipment were also reviewed along with the viability of power plants based on the use of hydrogen. The principle types of hydrogen power plants include hydrogen combustion engines; HY-Drive systems and fuel cells. It was concluded that although there is no viable alternative for diesel engines at present, Canadian mining companies operating at great depths have made significant progress in these fields and remain among the leaders in mining innovation. 17 refs.

  12. Analysis of local influences in structural details of the bridges

    Directory of Open Access Journals (Sweden)

    Adam RUDZIK

    2015-03-01

    Full Text Available The article analyses the problems of local influences in structural details of bridges as the critical locations, whose damages or excessive force may directly affect the safety of users. These analyses are shown on selected examples. Presented is the example of local changes in the forms of proper vibrations in the node of the truss bridge that can be used in expert issues concerning the causes of damages. The second example are the changes in stresses in the stay cable anchorage element including the nonlinear material models. Models of this type can be successfully used by engineers as they allow for analysis of selected structural details without the need for detailed mapping of the entire structure, but only a selected section.

  13. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Iliopsoas haematoma in a rugby player. Abstract PDF · Vol 29, No 1 (2017) - Articles The use of negative pressure wave treatment in athlete recovery. Abstract PDF. ISSN: 2078-516X. AJOL African ...

  14. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... No 3S (2017): Special Issue - Articles Experimental and numerical investigation on blast wave propagation in soil structure. Abstract PDF · Vol 9, No 3S (2017): Special Issue - Articles Simulation on ...

  15. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Duwa, S S. Vol 8 (2004) - Articles Lower hybrid waves instability in a velocity–sheared inhomogenous charged dust beam. Abstract · Vol 9 (2005) - Articles The slide away theory of lower hybrid bursts

  16. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... The use of negative pressure wave treatment in athlete recovery. Abstract PDF · Vol 29, No 1 (2017) - Articles The prevalence, risk factors predicting injury and the severity of injuries sustained during ...

  17. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Vol 29, No 1 (2017) - Articles The use of negative pressure wave treatment in athlete recovery. Abstract PDF · Vol 29, No 1 (2017) - Articles The prevalence, risk factors predicting injury and the ...

  18. Teaching Music to Students with Special Needs: A Label-Free Approach

    Science.gov (United States)

    Hammel, Alice; Hourigan, Ryan

    2011-01-01

    A practical guide & reference manual, "Teaching Music to Students with Special Needs" addresses special needs in the broadest possible sense to equip teachers with proven, research-based curricular strategies that are grounded in both best practice and current special education law. Chapters address the full range of topics and issues music…

  19. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Isa, M.F.M.. Vol 9, No 3S (2017): Special Issue - Articles Experimental and numerical investigation on blast wave propagation in soil structure. Abstract PDF · Vol 9, No 3S (2017): Special Issue - ...

  20. LDRD report: Smoke effects on electrical equipment

    International Nuclear Information System (INIS)

    TANAKA, TINA J.; BAYNES, EDWARD E. JR.; NOWLEN, STEVEN P.; BROCKMANN, JOHN E.; GRITZO, LOUIS A.; SHADDIX, Christopher R.

    2000-01-01

    Smoke is known to cause electrical equipment failure, but the likelihood of immediate failure during a fire is unknown. Traditional failure assessment techniques measure the density of ionic contaminants deposited on surfaces to determine the need for cleaning or replacement of electronic equipment exposed to smoke. Such techniques focus on long-term effects, such as corrosion, but do not address the immediate effects of the fire. This document reports the results of tests on the immediate effects of smoke on electronic equipment. Various circuits and components were exposed to smoke from different fields in a static smoke exposure chamber and were monitored throughout the exposure. Electrically, the loss of insulation resistance was the most important change caused by smoke. For direct current circuits, soot collected on high-voltage surfaces sometimes formed semi-conductive soot bridges that shorted the circuit. For high voltage alternating current circuits, the smoke also tended to increase the likelihood of arcing, but did not accumulate on the surfaces. Static random access memory chips failed for high levels of smoke, but hard disk drives did not. High humidity increased the conductive properties of the smoke. The conductivity does not increase linearly with smoke density as first proposed; however, it does increase with quantity. The data can be used to give a rough estimate of the amount of smoke that will cause failures in CMOS memory chips, dc and ac circuits. Comparisons of this data to other fire tests can be made through the optical and mass density measurements of the smoke

  1. Comparative survey of site and personnel monitoring characteristics for operation of various types of diagnostic-X ray equipment

    International Nuclear Information System (INIS)

    Lyarskij, P.P.; Zol'nikova, N.I.

    1977-01-01

    Diagnostic X-ray machines in present use at medical facilities differ in design and operating parameters, this diversity producing, in turn, a variety of local radiological situations and levels of personnel exposure. Based on radiological safety characterization of working conditions, the authors present a breakdown of contemporary diagnostic X-ray equipment types, based on detailed examination of each group in terms of their associated site monitoring and dosimetry patterns. The paper reports data on personnel exposure levels not only as a function of equipment design and operating characteristics but also according to types of occupational activities for particular medical personnel groups (radiologists, surgeons, anesthesiologists, etc.). Included are health physics data for domestic and foreign X-ray equipment, levels of local and absorbed doses for radiologists, cardiovascular surgeons, neurosurgeons, urologists, traumatologists, anesthesiologists, etc. Measures are recommended for optimizing their activities from the standpoint of radiation safety. (author)

  2. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  3. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Abstract PDF · Vol 3, No 6 (2011) - Articles Mixed convection flow and heat transfer in a vertical wavy channel containing porous and fluid layer with traveling thermal waves. Abstract PDF · Vol 3, No 8 ...

  4. Author Details

    African Journals Online (AJOL)

    Author Details. Journal Home > Advanced Search > Author Details. Log in or Register to get access to full text downloads. ... Ismail, A. Vol 9, No 3S (2017): Special Issue - Articles Investigate of wave absorption performance for oil palm frond and empty fruit bunch at 5.8 GHz. Abstract PDF · Vol 9, No 3S (2017): Special Issue ...

  5. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  6. A Study on Performance and Safety Tests of Electrosurgical Equipment

    Directory of Open Access Journals (Sweden)

    Tavakoli Golpaygani A.

    2016-09-01

    Full Text Available Introduction: Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient’s safety and management of the risks associated with the use of high and low frequency electrical currents on human body. Material and Methods: The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public was evaluated in one of the provinces of Iran according to international and national standards. Results: The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Conclusion: Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  7. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  8. Study on applicability of evaluation model of manpower needs for dismantling of equipments in FUGEN-2. Preparation and clean-up process in 3rd/4th feedwater heater room

    International Nuclear Information System (INIS)

    Shibahara, Yuji; Izumi, Masanori; Nanko, Takashi; Tachibana, Mitsuo

    2011-06-01

    Manpower needs for the preparation and clean-up process on the dismantling of equipments in FUGEN 3rd/4th feedwater heater room conducted in 2008 were calculated with the management data evaluation system: PRODIA Code, and it was inspected whether a conventional evaluation model had applicability for large nuclear facilities such as FUGEN or not. It was confirmed that the conventional evaluation model had no applicability for FUGEN causing by the difference in the plant scale between JPDR and FUGEN bringing expansion of working area. The difference between the actual data and the calculated value was improved by reviewing of the evaluation model, and this reviewing process also brought a new evaluation model. (author)

  9. Root cause analysis underscores the importance of understanding, addressing, and communicating cold chain equipment failures to improve equipment performance.

    Science.gov (United States)

    Lennon, Pat; Atuhaire, Brian; Yavari, Shahrzad; Sampath, Vidya; Mvundura, Mercy; Ramanathan, Nithya; Robertson, Joanie

    2017-04-19

    Vaccine cold chain equipment (CCE) in developing countries is often exposed to harsh environmental conditions, such as extreme temperatures and humidity, and is subject to many additional challenges, including intermittent power supply, insufficient maintenance capacity, and a scarcity of replacement parts. Together, these challenges lead to high failure rates for refrigerators, potentially damaging vaccines and adversely affecting immunization coverage. Providing a sustainable solution for improving CCE performance requires an understanding of the root causes of failure. Project teams conducted small-scale studies to determine the root causes of CCE failure in selected locations in Uganda and Mozambique. The evaluations covered 59 failed refrigerators and freezers in Uganda and 27 refrigerators in Mozambique. In Uganda, the vast majority of failures were due to a cooling unit fault in one widely used refrigerator model. In Mozambique, 11 of the 27 problems were attributable to solar refrigerators with batteries that were unable to hold a charge, and another eight problems were associated with a need to adjust thermostat settings. The studies showed that tracking and evaluation of equipment performance and failure can yield important, actionable information for a range of stakeholders, including local CCE technicians, the ministry of health, equipment manufacturers, and international partners such as the United Nations Children's Fund, World Health Organization, and Gavi, the Vaccine Alliance. Collaborative efforts to systematically collect and communicate data on CCE performance and causes of failure will help to improve the efficiency and reach of immunization programs in low- and middle-income countries. Copyright © 2016 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  10. Detailed design of product oriented manufacturing systems

    OpenAIRE

    Silva, Sílvio Carmo; Alves, Anabela Carvalho

    2006-01-01

    This paper presents a procedure for the detailed design and redesign of manufacturing systems within a framework of constantly fitting production system configuration to the varying production needs of products. With such an approach is achieved the design of Product Oriented Manufacturing Systems – POMS. This approach is in opposition to the fitting, before hand, of a production system to all products within a company. In this case is usual to adopt a Function Oriented Manufactur...

  11. Scientific Literacy Campaign among Children with Special Needs ...

    African Journals Online (AJOL)

    ... for them and equipping them to make decisions about matters which affect their well-being. The resources for scientific literacy should be provided. The importance of scientific literacy among the gifted and the necessity of assessment of scientific literacy level among children with special needs are adequately discussed.

  12. Control of hydrogen sulfide emission from geothermal power plants. Volume III. Final report: demonstration plant equipment descriptions, test plan, and operating instructions

    Energy Technology Data Exchange (ETDEWEB)

    Brown, F.C.; Harvey, W.W.; Warren, R.B.

    1977-01-01

    The elements of the final, detailed design of the demonstration plant for the copper sulfate process for the removal of hydrogen sulfide from geothermal steam are summarized. Descriptions are given of all items of equipment in sufficient detail that they can serve as purchase specifications. The process and mechanical design criteria which were used to develop the specifications, and the process descriptions and material and energy balance bases to which the design criteria were applied are included. (MHR)

  13. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  14. Effects of variable loads on equipment and cogeneration cycles performance; Influencia da variacao da carga no rendimento de equipamentos e ciclos de co-geracao

    Energy Technology Data Exchange (ETDEWEB)

    Ernst, Mario A.B.; Balestieri, Jose A.P. [UNESP, Guaratingueta, SP (Brazil). Escola de Engenharia. Dept. de Engenharia Mecanica]. E-mails: basulto1@uol.com.br; basulto@feg.unesp.br; perella@feg.unesp.br

    2000-07-01

    This article presents some aspects relative to the effects of changing loads on steam.generators and turbines. When the equipment solicitation varies due to industrial process demand changes, the equipment work in off-design point, altering its efficiency and the specific fuel rate. This work do not look for a detailed and exhaustive determination of the performance variation with the load but shows that in the selection of equipment this variation can have effects over the consume and the costs. In the present article it is assumed that the load variations are known, and the effects on the equipment efficiency were took from the correlated literature. An example of a Rankine cycle and other of a Brayton cycle are discussed, altering the operational conditions estimating the operating cost for each case. (author)

  15. Boosting flood warning schemes with fast emulator of detailed hydrodynamic models

    Science.gov (United States)

    Bellos, V.; Carbajal, J. P.; Leitao, J. P.

    2017-12-01

    Floods are among the most destructive catastrophic events and their frequency has incremented over the last decades. To reduce flood impact and risks, flood warning schemes are installed in flood prone areas. Frequently, these schemes are based on numerical models which quickly provide predictions of water levels and other relevant observables. However, the high complexity of flood wave propagation in the real world and the need of accurate predictions in urban environments or in floodplains hinders the use of detailed simulators. This sets the difficulty, we need fast predictions that meet the accuracy requirements. Most physics based detailed simulators although accurate, will not fulfill the speed demand. Even if High Performance Computing techniques are used (the magnitude of required simulation time is minutes/hours). As a consequence, most flood warning schemes are based in coarse ad-hoc approximations that cannot take advantage a detailed hydrodynamic simulation. In this work, we present a methodology for developing a flood warning scheme using an Gaussian Processes based emulator of a detailed hydrodynamic model. The methodology consists of two main stages: 1) offline stage to build the emulator; 2) online stage using the emulator to predict and generate warnings. The offline stage consists of the following steps: a) definition of the critical sites of the area under study, and the specification of the observables to predict at those sites, e.g. water depth, flow velocity, etc.; b) generation of a detailed simulation dataset to train the emulator; c) calibration of the required parameters (if measurements are available). The online stage is carried on using the emulator to predict the relevant observables quickly, and the detailed simulator is used in parallel to verify key predictions of the emulator. The speed gain given by the emulator allows also to quantify uncertainty in predictions using ensemble methods. The above methodology is applied in real

  16. Reducing chronic obstructive pulmonary disease readmissions: the role of the durable medical equipment provider.

    Science.gov (United States)

    Messenger, Robert W

    2012-01-01

    Exacerbation and frequent rehospitalization in chronic obstructive pulmonary disease exacts a heavy toll on the US health care system. To address these issues, new initiatives have been proposed that are largely based on financial penalties to promote patient education and postdischarge care. However, as laudable as these goals are, improving outcomes in the chronic obstructive pulmonary disease population is more confounding than it may first appear. Chronic hypoxia, cognitive dysfunction, poor nutrition, and economic disadvantage are just a few of the challenges that require creative solutions and ongoing support. Case managers need to utilize all the potential products and services that can assist in improving outcomes for these patients. Durable medical equipment providers are often viewed as purveyors of medical equipment that offer little in the form of clinical support. However, in many cases these providers represent an overlooked resource that provides individualized, highly structured patient education and ongoing support programs. The challenge is in identifying those durable medical equipment providers that offer patients contemporary technology, and have both the resources and the commitment to provide patient support that is amenable to the goals of the hospital. This article reviews many of the confounding issues that contribute to the frequent rehospitalization of chronic obstructive pulmonary disease patients. Recommendations to improve patient education and oxygen therapy outcomes are provided along with suggestions to aid in the vetting of durable medical equipment providers. Acute care hospitals, long-term acute care hospitals, extended care facilities, integrated delivery systems. 1. An understanding of the complex variables that play in the management of chronic obstructive pulmonary disease will help the case manager to plan an effective course of care. 2. Case managers need to ensure that patients receive long-term oxygen technology that

  17. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  18. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  19. Diagnosis - Using automatic test equipment and artificial intelligence expert systems

    Science.gov (United States)

    Ramsey, J. E., Jr.

    Three expert systems (ATEOPS, ATEFEXPERS, and ATEFATLAS), which were created to direct automatic test equipment (ATE), are reviewed. The purpose of the project was to develop an expert system to troubleshoot the converter-programmer power supply card for the F-15 aircraft and have that expert system direct the automatic test equipment. Each expert system uses a different knowledge base or inference engine, basing the testing on the circuit schematic, test requirements document, or ATLAS code. Implementing generalized modules allows the expert systems to be used for any different unit under test. Using converted ATLAS to LISP code allows the expert system to direct any ATE using ATLAS. The constraint propagated frame system allows for the expansion of control by creating the ATLAS code, checking the code for good software engineering techniques, directing the ATE, and changing the test sequence as needed (planning).

  20. Use of seismic experience data for replacement and new equipment

    International Nuclear Information System (INIS)

    Johnson, H.W.; Hardy, G.S.; Horstman, N.G.; Baughman, P.D.

    1990-01-01

    Over the past seven years the use of seismic experience data to address seismic concerns has received a great deal of attention, particularly regarding the NRC Unresolved Safety Issue (USI) A-46. The Seismic Qualification Utility Group (SQUG) was formed in January 1982 to develop a practical alternative to the rigorous seismic qualification of equipment for resolution of USI A-46. The alternative method chosen is seismic experience technology. The purpose of this paper is to explore two additional potential applications of seismic experience technology: Replacement parts and New equipment/design change process. The need for, and benefits of, these applications are summarized. The available technology and the methodologies proposed are described. The methodology descriptions include a summary of the requirements for the seismic evaluations, an outline of the method, and the documentation requirements. (orig./HP)