WorldWideScience

Sample records for equipment including boring

  1. 30 CFR 18.22 - Boring-type machines equipped for auxiliary face ventilation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Boring-type machines equipped for auxiliary..., DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.22 Boring-type machines equipped for...

  2. Boring of full scale deposition holes at the Aespoe Hard Rock Laboratory. Operational experiences including boring performance and a work time analysis

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Christer [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden); Johansson, Aasa [SWECO, Stockholm (Sweden)

    2002-12-01

    Thirteen experimental deposition holes similar to those in the present KBS-3 design have been bored at the Aespoe Hard Rock Laboratory, Oskarshamn, Sweden. The objective with the boring program was to test and demonstrate the current technique for boring of large vertical holes in granitic rock. Conclusions and results from this project is used in the planning process for the deposition holes that will be bored in the real repository for spent nuclear fuel. The boreholes are also important for three major projects. The Prototype Repository, the Canister Retrieval Test and the Demonstration project will all need full-scale deposition holes for their commissioning. The holes are bored in full scale and have a radius of 1.75 m and a depth of 8.5 m. To bore the holes an existing TBM design was modified to produce a novel type Shaft Boring Machine (SBM) suitable for boring 1.75 m diameter holes from a relatively small tunnel. The cutter head was equipped with two types of roller cutters: two row carbide button cutters and disc cutters. Removal of the cuttings was made with a vacuum suction system. The boring was monitored and boring parameters recorded by a computerised system for the evaluation of the boring performance. During boring of four of the holes temperature, stress and strain measurements were performed. Acoustic emission measurements were also performed during boring of these four holes. The results of these activities will not be discussed in this report since they are reported separately. Criteria regarding nominal borehole diameter, deviation of start and end centre point, surface roughness and performance of the machine were set up according to the KBS-3 design and were fulfilled with a fair margin. The average total time for boring one deposition hole during this project was 105 hours.

  3. Boring of full scale deposition holes at the Aespoe Hard Rock Laboratory. Operational experiences including boring performance and a work time analysis

    International Nuclear Information System (INIS)

    Andersson, Christer; Johansson, Aasa

    2002-12-01

    Thirteen experimental deposition holes similar to those in the present KBS-3 design have been bored at the Aespoe Hard Rock Laboratory, Oskarshamn, Sweden. The objective with the boring program was to test and demonstrate the current technique for boring of large vertical holes in granitic rock. Conclusions and results from this project is used in the planning process for the deposition holes that will be bored in the real repository for spent nuclear fuel. The boreholes are also important for three major projects. The Prototype Repository, the Canister Retrieval Test and the Demonstration project will all need full-scale deposition holes for their commissioning. The holes are bored in full scale and have a radius of 1.75 m and a depth of 8.5 m. To bore the holes an existing TBM design was modified to produce a novel type Shaft Boring Machine (SBM) suitable for boring 1.75 m diameter holes from a relatively small tunnel. The cutter head was equipped with two types of roller cutters: two row carbide button cutters and disc cutters. Removal of the cuttings was made with a vacuum suction system. The boring was monitored and boring parameters recorded by a computerised system for the evaluation of the boring performance. During boring of four of the holes temperature, stress and strain measurements were performed. Acoustic emission measurements were also performed during boring of these four holes. The results of these activities will not be discussed in this report since they are reported separately. Criteria regarding nominal borehole diameter, deviation of start and end centre point, surface roughness and performance of the machine were set up according to the KBS-3 design and were fulfilled with a fair margin. The average total time for boring one deposition hole during this project was 105 hours

  4. Key technologies of drilling process with raise boring method

    Directory of Open Access Journals (Sweden)

    Zhiqiang Liu

    2015-08-01

    Full Text Available This study presents the concept of shaft constructed by raise boring in underground mines, and the idea of inverse construction can be extended to other fields of underground engineering. The conventional raise boring methods, such as the wood support method, the hanging cage method, the creeping cage method, and the deep-hole blasting method, are analyzed and compared. In addition, the raise boring machines are classified into different types and the characteristics of each type are described. The components of a raise boring machine including the drill rig, the drill string and the auxiliary system are also presented. Based on the analysis of the raise boring method, the rock mechanics problems during the raise boring process are put forward, including rock fragmentation, removal of cuttings, shaft wall stability, and borehole deviation control. Finally, the development trends of raise boring technology are described as follows: (i improvement of rock-breaking modes to raise drilling efficiency, (ii development of an intelligent control technique, and (iii development of technology and equipment for nonlinear raise boring.

  5. Mining face equipment

    Energy Technology Data Exchange (ETDEWEB)

    G, Litvinskiy G; Babyuk, G V; Yakovenko, V A

    1981-01-07

    Mining face equipment includes drilling advance wells, drilling using explosives on the contour bore holes, loading and transporting the crushed mass, drilling reinforcement shafts, injecting reinforcement compounds and moving the timber. Camouflet explosives are used to form relaxed rock stress beyond the mining area to decrease costs of reinforcing the mining area by using nonstressed rock in the advance well as support. The strengthening solution is injected through advanced cementing wells before drilling the contour bores as well as through radial cementing wells beyond the timbers following loading and transport of the mining debris. The advance well is 50-80 m.

  6. Integrated test plan for directional boring

    International Nuclear Information System (INIS)

    Volk, B.W.

    1993-01-01

    This integrated test plan describes the field testing of the DITCH WITCH Directional Boring System. DITCH WITCH is a registered trademark of The Charles Machine Works, Inc., Perry, Oklahoma. The test is being conducted as a coordinated effort between Charles Machine Works (CMW), Sandia National Laboratories (SNL), and the Westinghouse Hanford Company (WHC). Funding for the WHC portion of the project is through the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). The purpose of the test is to evaluate the performance of the directional boring system for possible future use on environmental restoration projects at Hanford and other Department of Energy (DOE) sites. The test will be conducted near the 200 Areas Fire Station located between the 200 East and 200 West Area of the Hanford Site. The directional boring system will be used to drill and complete (with fiberglass casing) two horizontal boreholes. A third borehole will be drilled to test sampling equipment but will not be completed with casing

  7. Boring of full scale deposition holes using a novel dry blind boring method

    Energy Technology Data Exchange (ETDEWEB)

    Autio, J.; Kirkkomaeki, T. [Saanio and Riekkola Oy, Helsinki (Finland)

    1996-10-01

    Three holes the size of deposition holes (depth 7.5 m and diameter 1.5 m) were bored in the Research Tunnel at Olkiluoto, Finland. A novel full-face boring technique was used based on rotary crushing of rock and removal of crushed rock by vacuum flushing through the drill string. The purpose of the work was to demonstrate the feasibility of the technique. During the boring test procedures were carried out in order to determine the effect of changes in operating parameters on the performance of the boring machine and the quality of the hole. The boring method was found to be technically feasible and efficient. Evaluation of the quality of the hole included studies of the geometry of the hole, measurements of the surface roughness using a laser profilometer and study of excavation disturbances in the zone adjacent to the surface of the holes using two novel methods, He-gas diffusion and the {sup 14}C-polymethylmethacrylate methods. 43 refs.

  8. Preliminary Study for Development of Welds Integrity Verification Equipment for the Small Bore Piping

    International Nuclear Information System (INIS)

    Choi, Geun Suk; Lee, Jong Eun; Ryu, Jung Hoon; Cho, Kyoung Youn; Sohn, Myoung Sung; Lee, Sanghoon; Sung, Gi Ho; Cho, Hong Seok

    2016-01-01

    It has been reported leakage accident of small-bore piping in Korea. Leakage accident of small-bore pipes are those that will increase due to the aging of the nuclear power plant. And if leakage of the pipe is repaired by using the clamping device when it occur accident, it is economically benefits. The clamping device is a fastening device used to hold or secure objects tightly together to prevent movement or separation through the application of inward pressure. However, when the accident occurs, it can't immediately respond because maintenance and repairing technology are not institutionalized in KEPIC. Thus it appears an economic loss. The technology for corresponding thereto is necessary for the safety of the operation of nuclear power plants. The purpose of this research is to develop an online repairing technology of socket welded pipe and vibration monitoring system of small-bore pipe in the nuclear power plant. Specifically, detailed studies are as follows : • Development of weld overlay method of safety class socket welded connections • Development of Mechanical Clamping Devices for Safety Class 2, 3 small-bore pipe. The purpose of this study is to develop an online repairing technology of socket welded pipe and vibration monitoring system of small-bore pipe, resulting in degraded plant systems. And it is necessary to institutionalize the technology. The fatigue crack testing of socket welded overlay will be performed and fatigue life evaluation method will be developed in second year. Also prototype fabrication of mechanical clamping device will be completed. Base on final goal, the intent is to propose practical evaluation tools, design and fabrication methods for socket welded connection integrity. And result of this study is to development of KEPIC code case approved technology for on-line repairing system of socket welded connection and fabrication of mechanical clamping device

  9. In-bore instrumentation/diagnostics for large-bore EMLs

    International Nuclear Information System (INIS)

    Fernandez, M.J.; Ager, S.A.; Hudson, R.D.

    1991-01-01

    This paper reports on a flying laboratory technique of in-bore diagnostics for large-bore electromagnetic launchers (EMLs). The high pressure, heat, and magnetic flux environment of the EML and its containment structures do not allow easy implementation of conventional diagnostic techniques. Researchers have relied on remote sensing methods, such as B probes (isolated from the bore), for data. The accuracy and relevance of such discrete, remote measurement is somewhat questionable. An in-house program has been initiated to determine the feasibility of making measurement of EML parameters on board a projectile. This technique utilizes off-the-shelf components in a configuration that has been proven effective in measuring projectile acceleration in the bore of propellant driven guns

  10. Mechanisms for closing bores and releasably securing articles within the bores under longitudinal load

    International Nuclear Information System (INIS)

    Klahn, F.C.; Nolan, J.H.; Wills, C.

    1979-01-01

    This invention relates to mechanisms for closing bores of tubular passages and for releasably securing articles within the bores under longitudinal load. The system includes an axially movable latch, an actuator and locking devices. Embodiments of the invention can be used as closure mechanisms for tubular irradiation surveillance specimen assembly holders used in nuclear reactors. (UK)

  11. Mechanisms for closing bores and releasably securing articles within the bores under longitudinal load

    International Nuclear Information System (INIS)

    Kalen, D.D.; Mitchem, J.W.

    1979-01-01

    This invention relates to mechanisms for closing bores of tubular passages and for releasably securing articles within the bores under longitudinal load. The system includes an axially movable actuator and a latch which engages the tubular opening. Embodiments of the invention can be used as closure mechanisms for tubular irradiation surveillance specimen assembly holders used in nuclear reactors. (UK)

  12. Design of a machine to bore and line a long horizontal hole in tuff: Nevada Nuclear Waste Storage Investigations Project

    International Nuclear Information System (INIS)

    Friant, J.E.; Dowden, P.B.

    1987-09-01

    This report describes an engineering design for equipment capable of simultaneously drilling and lining deep horizontal bore holes. The ultimate use of the equipment is to bore up to 600 ft long, 3 ft diameter emplacement holes for a nuclear waste repository. The specific system designed is referred to as a Development Prototype Boring Machine (DPBM) which will be used to demonstrate the drilling/lining capability in field development tests. The system utilizes as in-hole electric drive and a vacuum chip removal and handling system. The drilling unit is capable of active directional control and uses laser-type alignment equipment. The system combines the features of a small steerable tunnel boring machine, combined with a horizontally-oriented raise drill, thereby utilizing current technology. All elements of the system are compact and mobile as required for a shaft entry, underground mining environment. 3 refs., 35 figs., 1 tab

  13. Bore pile foundation tall buildings closed in the heritage building

    Science.gov (United States)

    Triastuti, Nusa Setiani

    2017-11-01

    Bore pile foundation for high building surroundings heritage building should be not damage. Construction proses must good, no necking, no mixed deep water, no sliding soil, nonporous concrete. Objective the execution of bore pile so that heritage buildings and neighboring buildings that are old do not experience cracks, damage and tilting. The survey methodology was observe the process of the implementation of the dominant silt, clay soil, in addition a limited space and to analyze the results of loading tests, investigations of soil and daily reports. Construction process determines the success of the structure bore pile in high building structure bearing, without damaging a heritage building. Attainment the hard soil depth, density concrete, observable clean reinforcement in the implementation. Monitoring the implementation of, among others, the face of the ground water little reduce in the area and outside the footprint of the building, no impact of vibration drilling equipment, watching the mud content on the water coming out at the time of drilling, concrete volume was monitored each 2 m bore depth of pile, The result researched heritage building was not damage. The test results bore pile axial, lateral analyzed the results have the appropriate force design required.

  14. Retained foreign body following pleural drainage with a small-bore catheter.

    Science.gov (United States)

    Paddle, Alenka; Elahi, Maqsood; Newcomb, Andrew

    2010-01-01

    Small-bore radiopaque drains can be used to drain pleural effusions. They offer reliable drainage of simple pleural effusions and provide a safe, less-invasive, more comfortable alternative to the standard tube thoracostomy. Importantly, removal of such drains does not require purse-string sutures and hence can be removed without assistance. We report here the cautionary tale of a retained foreign body related to drainage of a pleural effusion with a Pleurocath in a patient following cardiac surgery to raise awareness of this potential complication. Emphasized is the need for all staff to be familiar with the normal appearance of equipment being utilized in the ward and to report when incomplete removal of drain equipment is suspected. In addition, amendments to insertion techniques for such small-bore drains are proposed to avoid similar undue complications.

  15. Development of self-boring type pressuremeter and proposal of empirical formula to estimate mechanical properties of gravelly soil

    International Nuclear Information System (INIS)

    Yoshida, Yasuo; Ikemi, Motonobu; Kokusho, Takaji

    1990-01-01

    Diluvial gravelly grounds seem to have the great potential as the foundation ground for constructing nuclear power plants. The Central Research Institute of Electric Power Industry develops the in-situ testing method to evaluate the settlement and the stability of the foundations of important nuclear power plant structures against earthquakes. As a part of the development, the CRIEPI has developed a new self boring type pressure meter which enables a probe to penetrate into gravelly deposit with minimum disturbance. This equipment can impose static or dynamic repeated pressure on bore walls. In this report, the test results of this equipment used in five gravelly grounds in Japan are described. The test results were compared with those obtained by other methods, and the efficiency of this in situ method was demonstrated. The bore wall pressurizing tester which can be inserted simultaneously with boring was developed, and its features are the effects of stress release and bore wall disturbance are little. Consequently, the accurate data on ground stability can be obtained. (K.I.)

  16. Analysis of in-situ renewal technology for the backhoe bucket bores

    Energy Technology Data Exchange (ETDEWEB)

    Torims, Toms; Ratkus, Andris; Vilcans, Janis; Zarins, Marcis; Rusa, Aldis [Department of Material Processing Technology Faculty of Transport and Mechanical Engineering Riga Technical University, Riga (Latvia)

    2011-07-01

    The overall aim of this article is to outline the progress of the research on how to develop an economically and scientifically justified backhoe buckets boreholes renewal technology by using mobile on-site technological equipment. Today the new mobile (in-situ) repair technologies are extensively used for the specialized equipment and machinery repairs. This repair technology is deployed directly on the damaged product: repair equipment is installed by using specialized centering devices. The bucket bores central axes are used as a reference base and damaged layer of material is removed mechanically applying turning operation. Subsequently the renewable surface is covered by new material layer by means of regular MIG/MAG welding. The last technological operation is final turning to the nominal diameter. Outlined renewal technology should meet high expectations – this necessitates in-depth and systematic study of pins and bores which are the most repaired objects of shovel bucket excavators. Therefore, research on established accuracy and technical requirements, both for the repaired unit and technological equipment in line with in-situ repair technology specifics, has been done. It was supported by impact analysis of the technological regimes to surface integrity with ambition to provide practical recommendations for the optimal choice of the technological regimes. Key words: in-situ repair technology, surface integrity, technological parameters.

  17. 15 CFR 9.3 - Appliances and equipment included in program.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Appliances and equipment included in... VOLUNTARY LABELING PROGRAM FOR HOUSEHOLD APPLIANCES AND EQUIPMENT TO EFFECT ENERGY CONSERVATION § 9.3 Appliances and equipment included in program. The appliances and equipment included in this program are room...

  18. Boring of full scale deposition holes using a novel dry blind boring method

    International Nuclear Information System (INIS)

    Autio, J.; Kirkkomaeki, T.

    1996-11-01

    As a part of the Finnish radioactive waste disposal research three holes (the size of deposition holes) were bored in the research tunnel at Olkiluoto in Finland. A novel full-face boring technique was used based on rotary crushing of rock and removal of crushed rock by vacuum flushing through the drill string an the purpose of the work was to demonstrate the feasibility of the technique. During the boring test procedures were carried out in order to determine the effect of charges in operating parameters on the performance of the boring machine and the quality of the hole. (refs.)

  19. Boring of full scale deposition holes using a novel dry blind boring method

    Energy Technology Data Exchange (ETDEWEB)

    Autio, J.; Kirkkomaeki, T. [Saanio and Riekkola Consulting Engineers, Helsinki (Finland)

    1996-11-01

    As a part of the Finnish radioactive waste disposal research three holes (the size of deposition holes) were bored in the research tunnel at Olkiluoto in Finland. A novel full-face boring technique was used based on rotary crushing of rock and removal of crushed rock by vacuum flushing through the drill string an the purpose of the work was to demonstrate the feasibility of the technique. During the boring test procedures were carried out in order to determine the effect of charges in operating parameters on the performance of the boring machine and the quality of the hole. (refs.).

  20. A boring solution

    Energy Technology Data Exchange (ETDEWEB)

    Radiuk, M I; Iushkova, N E; Kozubovskii, A I

    1979-10-25

    A boring solution is being patented for boring for oil and gas, which can be used in wells, where the temperature of the circulating liquid reaches 100/sup 0/. Polyvinyl acetate emulsion (PVE) is added for the purpose of decreasing viscosity of the solution at a temperature of agression into the boring solution containing clay, water, carboxymethylcellulose (CBC), a chloride from the number of sodium, potassium, or magnesium chlorides. The solution has the following composition in %: clay, 10 to 20; CBC, 1.5 to 2.0; chloride, 5 to 20; PVE, 0.5 to 2; water, up to 100. In accordance to GOST 1000-62 for the accepted PVE, the compound has the following composition, in %: monomer, 0.8; dry residue, greater than or equal to 50; plasticizer (tributyl phthalate), 5 to 15. The boring solution is processed according to the following method. The original solution, containing clay, water, salts, receives 1.5 to 2% CBC and afterwards it is processed with 0.5 to 2% PVE.

  1. Mind where you bore!

    CERN Document Server

    Anaïs Schaeffer

    2012-01-01

    With renewable energies on the up and up, geothermal heating is becoming increasingly popular. An ardent supporter of sustainable development, CERN welcomes this trend, even though it has certain risks for the Laboratory.   More and more people in Switzerland and France are switching to geothermal heating, with the result that more and more bore holes are being sunk for geothermal probes. Since, on average, such bore holes go down to depths of 100 m they can have an impact on CERN’s underground facilities, which are also located at approximately that depth. In the Canton of Geneva, all bore holes, whatever their depth, are subject to planning permission. Applications for planning permission are granted – or refused – only after consultation with the Ground survey department (GESDEC). In France, only bore holes below a depth of 100 m require planning permission. In theory, bore holes to lesser depths simply need to be declared to the DREAL (Dire...

  2. Atmospheric noise of a breaking tidal bore.

    Science.gov (United States)

    Chanson, Hubert

    2016-01-01

    A tidal bore is a surge of waters propagating upstream in an estuary as the tidal flow turns to rising and the flood tide propagates into a funnel-shaped system. Large tidal bores have a marked breaking roller. The sounds generated by breaking tidal bores were herein investigated in the field (Qiantang River) and in laboratory. The sound pressure record showed two dominant periods, with some similarity with an earlier study [Chanson (2009). J. Acoust. Soc. Am. 125(6), 3561-3568]. The two distinct phases were the incoming tidal bore when the sound amplitude increased with the approaching bore, and the passage of the tidal bore in front of the microphone when loud and powerful noises were heard. The dominant frequency ranged from 57 to 131 Hz in the Qiantang River bore. A comparison between laboratory and prototype tidal bores illustrated both common features and differences. The low pitch sound of the breaking bore had a dominant frequency close to the collective oscillations of bubble clouds, which could be modeled with a bubble cloud model using a transverse dimension of the bore roller. The findings suggest that this model might be over simplistic in the case of a powerful breaking bore, like that of the Qiantang River.

  3. Pulverization of boron element and proportions of boron carbide in boron; Broyage de bore element et dosage de carbure de bore dans le bore

    Energy Technology Data Exchange (ETDEWEB)

    Lang, F M; Finck, C [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1956-07-01

    It is possible to reduce boron element into fine powder by means of a mortar and pestle made of sintered boron carbide, the ratio of boron carbide introduced being less than one per cent. Boron element at our disposal is made of sharp edged, dark brown, little grains of average size greater than 5 {mu}. Grain sizes smaller than 1{mu} are required for applying thin layers of such boron. (author) [French] Il est possible de pulveriser finement du bore element au moyen de mortier et pilon en carbure de bore fritte, le taux de carbure de bore introduit etant inferieur a 1 pour cent. Le bore element dont nous disposons est constitue de petits grains brun fonce, a aretes vives, de dimension moyenne superieure a 5 {mu}. L'application de ce bore en couches minces demande des grains de dimensions inferieures a 1 {mu}. (aute0008.

  4. Catastrophic failure of a raise boring machine during underground reaming operations

    CSIR Research Space (South Africa)

    James, A

    1997-03-01

    Full Text Available rights reserved. 1. INTRODUCTION The process of raise boring (or back reaming) has been in use for over 30 years, and has proved to be a very successful technique in underground mining operations. Its primary use... the overhaul, the equipment was moved from its underground location to the surface. All the drive head bolts were replaced. A cutaway diagram of the drive head installation, showing the relative positions of the cover, drive...

  5. Quality assessment in in vivo NMR spectroscopy: V. Multicentre evaluation of prototype test objects and protocols for performance assessment in small bore MRS equipment

    DEFF Research Database (Denmark)

    Howe, F.A.; Canese, R; Podo, F

    1995-01-01

    This paper reports the results of multicentre studies aimed at designing, constructing, and evaluating prototype test objects for performance assessment in small-bore MRS systems, by utilizing the test protocols already proposed by the EEC COMAC-BME Concerted Action for clinical MRS equipment...... using ISIS as volume localization sequence in 31P MRS. The results suggested the interest of adopting some of these prototypes for improving the comparison of spectroscopy data obtained from different sites, for providing useful means of quality assurance in experimental MRS, and facilitating....... Three classes of test objects were considered: (1) a multicompartment test object for 31P MRS measurements performed with slice-selective sequences; (2) a two-compartment test object for volume-selection 1H MRS; and (3) two-compartment test objects for assessing the performance of experimental systems...

  6. Optimal chest drain size: the rise of the small-bore pleural catheter.

    Science.gov (United States)

    Fysh, Edward T H; Smith, Nicola A; Lee, Y C Gary

    2010-12-01

    Drainage of the pleural space is not a modern concept, but the optimal size of chest drains to use remains debated. Conventional teaching advocates blunt dissection and large-bore tubes; but in recent years, small-bore catheters have gained popularity. In the absence of high-quality randomized data, this review summarizes the available literature on the choice of chest drains. The objective data supporting the use of large-bore tubes is scarce in most pleural diseases. Increasing evidence shows that small-bore catheters induce less pain and are of comparable efficacy to large-bore tubes, including in the management of pleural infection, malignant effusion, and pneumothoraces. The onus now is on those who favor large tubes to produce clinical data to justify the more invasive approach. © Thieme Medical Publishers.

  7. Strategies for replacement of obsolete equipment - including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2000-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of: commercially available equivalent component; modification of a commercial available component; reverse engineering of the original component; and finally, design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: Missing, misleading or no information on the original component; Acquiring information from the original equipment manufacturer and the plant; Using a sample component for the replacement evaluation and or reverse engineering; and Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  8. Strategies for replacement of obsolete equipment, including reverse engineering

    International Nuclear Information System (INIS)

    Irish, C.S.

    2003-01-01

    The presentation shall detail the challenges facing nuclear power plants with the replacement of obsolete equipment and the strategies used to overcome those challenges. The presentation will outline the common equipment types which are either obsolete or are becoming obsolete, with a focus on safety related components. The four options of the obsolete equipment replacement philosophy will be presented with replacement examples from each of the options shown for discussion purposes. Detailed examples from each of the four obsolete equipment replacement options of, (1) commercially available equivalent component, (2) modification of a commercial available component, (3) reverse engineering of the original component and finally (4) design changes using a new component, shall be presented to evaluate the advantages and disadvantages of each option. The presentation will include the technical challenges, cost and schedule concerns for each of the four options. Emphasis will be placed on the technological challenges associated with replacing old and obsolete equipment. The following is a bullet list of the challenges which will be discussed: 1) Missing, misleading or no information on the original component. 2) Acquiring information from the original equipment manufacturer and the plant. 3) Using a sample component for the replacement evaluation and or reverse engineering. 4) Reverse engineering old equipment with newly available discrete components. The presentation will include the equivalency documentation using the EPRI guidelines when replacing an original component with a different yet form, fit and functional equivalent component. The presentation will conclude with a discussion of the advantages and disadvantages of the replacement of the obsolete component with a form, fit and functional equivalent component vs. the replacement of the original component with a new component with today's technology. (author)

  9. Energy Efficiency of Tunnel Boring Machines.

    OpenAIRE

    Grishenko, Vitaly

    2014-01-01

    Herrenknecht AG is a German world-leading Tunnel Boring Machines manufacturer showing strong awareness and concern regarding environmental issues. The company supports research on the Energy Efficiency (EE) of their products, aimed at the development of intelligent design for a green Tunnel Boring Machine. The aim of this project is to produce a ’status quo’ report on EE of three types of Tunnel Boring Machines (Hardrock, EPB and Mixshield TBM). In the framework of this research 39 projects a...

  10. Conditions for tidal bore formation in convergent alluvial estuaries

    Science.gov (United States)

    Bonneton, Philippe; Filippini, Andrea Gilberto; Arpaia, Luca; Bonneton, Natalie; Ricchiuto, Mario

    2016-04-01

    Over the last decade there has been an increasing interest in tidal bore dynamics. However most studies have been focused on small-scale bore processes. The present paper describes the first quantitative study, at the estuary scale, of the conditions for tidal bore formation in convergent alluvial estuaries. When freshwater discharge and large-scale spatial variations of the estuary water depth can be neglected, tide propagation in such estuaries is controlled by three main dimensionless parameters: the nonlinearity parameter ε0 , the convergence ratio δ0 and the friction parameter ϕ0. In this paper we explore this dimensionless parameter space, in terms of tidal bore occurrence, from a database of 21 estuaries (8 tidal-bore estuaries and 13 non tidal-bore estuaries). The field data point out that tidal bores occur for convergence ratios close to the critical convergence δc. A new proposed definition of the friction parameter highlights a clear separation on the parameter plane (ϕ0,ε0) between tidal-bore estuaries and non tidal-bore estuaries. More specifically, we have established that tidal bores occur in convergent estuaries when the nonlinearity parameter is greater than a critical value, εc , which is an increasing function of the friction parameter ϕ0. This result has been confirmed by numerical simulations of the two-dimensional Saint Venant equations. The real-estuary observations and the numerical simulations also show that, contrary to what is generally assumed, tide amplification is not a necessary condition for tidal bore formation. The effect of freshwater discharge on tidal bore occurrence has been analyzed from the database acquired during three long-term campaigns carried out on the Gironde/Garonne estuary. We have shown that in the upper estuary the tidal bore intensity is mainly governed by the local dimensionless tide amplitude ε. The bore intensity is an increasing function of ε and this relationship does not depend on freshwater

  11. Railgun bore material test results

    International Nuclear Information System (INIS)

    Wang, S.Y.; Burton, R.L.; Witherspoon, F.D.; Bloomberg, H.W.; Goldstein, S.A.; Tidman, D.A.; Winsor, N.K.

    1987-01-01

    GT-Devices, Inc. has constructed a material test facility (MTF) to study the fundamental heat transfer problem of both railgun and electrothermal guns, and to test candidate gun materials under real plasma conditions. The MTF electrothermally produces gigawatt-level plasmas with pulse lengths of 10-30 microseconds. Circular bore and non-circular bore test barrels have been successfully operated under a wide range of simulated heating environments for EM launchers. Diagnostics include piezoelectric MHz pressure probes, time-of-flight probes, and current and voltage probes. Ablation measurements are accomplished by weighing and optical inspection, including borescope, optical microscope, and scanning electron microscope (SEM). From these measurements the ablation threshold for both the rail and insulator materials can be determined as a function of plasma heating. The MTF diagnostics are supported by an unsteady 1-D model of MTF which uses the flux-corrected transport (FCT) algorithm to calculate the fluid equations in conservative form. A major advantage of the FCT algorithm is that it can model gas dynamic shock behaviour without the requirement of numerical diffusion. The principle use of the code is to predict the material surface temperature ΔT/α from the unsteady heat transfer q(t)

  12. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  13. Twin header bore welded steam generator for pressurized water reactors

    International Nuclear Information System (INIS)

    Davies, R.J.; Hirst, B.

    1979-01-01

    A description is given of a pressurized water reactor (PWR) steam generator concept, several examples of which have been in service for up to fourteen years. Details are given of the highly successful service record of this equipment and the features which have been incorporated to minimize corrosion and deposition pockets. The design employs a vertical U tube bundle carried off two horizontal headers to which the tubes are welded by the Foster Wheeler Power Products (FWPP) bore welding process. The factors to be considered in uprating the design to meet the current operating conditions for a 1000 MW unit are discussed. (author)

  14. TMI-2 core bore acquisition summary report

    International Nuclear Information System (INIS)

    Tolman, E.L.; Smith, R.P.; Martin, M.R.; McCardell, R.K.; Broughton, J.M.

    1986-09-01

    Core bore samples were obtained from the severely damaged TMI-2 core during July and August, 1986. A description of the TMI-2 core bore drilling unit used to obtain samples; a summary and discussion of the data from the ten core bore segments which were obtained; and the initial results of analysis and evaluation of these data are presented in this report. The impact of the major findings relative to our understanding of the accident scenario is also discussed

  15. Internal-bore-welding of 2 1/4 Cr--1 Mo steel tube-to-tubesheet joints

    International Nuclear Information System (INIS)

    Moorhead, A.J.; Slaughter, G.M.

    1976-01-01

    In order to avoid the disadvantages of the conventional face-side tube-to-tubesheet weld, the steam generators for the Clinch River Breeder Reactor Plant (a power-producing demonstration LMFBR) will be built using a relatively new technique known as internal-bore-welding (IBW). In IBW the tube does not pass through the tubesheet but rather is welded to a short stub machined on the tube side of the tubesheet. This joint has the important advantages of being inspectable by radiography and eliminating the crevice; however, it is much more difficult to weld than is the face-side design. Because of the close proximity of the tubes, there is not room for an orbiting-arc welding head on the outside of the tube. Consequently, this weld must be made by welding from the inside- or bore-side of the tube. The results are presented of the initial phases of a program undertaken at ORNL to develop improved bore-side welding equipment, to gain further understanding of this technique, and to develop mechanical property data for autogeneous welds in 2 1/4 Cr-1 Mo steel tube and tubesheet materials

  16. Grinding tool for making hemispherical bores in hard materials

    Science.gov (United States)

    Duran, E.L.

    1985-04-03

    A grinding tool for forming hemispherical bores in hard materials such as boron carbide. The tool comprises a hemicircular grinding bit, formed of a metal bond diamond matrix, which is mounted transversely on one end of a tubular tool shaft. The bit includes a spherically curved outer edge surface which is the active grinding surface of the tool. Two coolant fluid ports on opposite sides of the bit enable introduction of coolant fluid through the bore of the tool shaft so as to be emitted adjacent the opposite sides of the grinding bit, thereby providing optimum cooling of both the workpiece and the bit.

  17. High-cycle fatigue properties of small-bore socket-welded pipe joint

    International Nuclear Information System (INIS)

    Maekawa, Akira; Noda, Michiyasu; Suzuki, Michiaki

    2009-01-01

    Piping and equipment in nuclear power plants are structures including many welded joints. Reliability of welded joints is one of high-priority issues to improve the safety of nuclear power plants. However, occurrence of fatigue failures in small-bore socket-welded pipe joints by high-cycle vibrations is still reported. In this study, fatigue experiments on a socket-welded joint of austenitic stainless steel pipe was conducted under excitation conditions similar to those in actual plants to investigate vibration characteristics and fatigue strength. It was found that the natural frequency of pipe with socket-welded joint gradually decreased as fatigue damage developed, according to the Miner rule for fatigue life evaluation. The results indicate that the fatigue life of the welded pipe joint could be estimated by monitoring the decreasing ratio of the natural frequency of the pipe. The evaluation of decreasing ratio of the natural frequency in addition to fatigue damage evaluation by the Miner rule could enhance the accuracy of fatigue life evaluation. (author)

  18. Turbulent mixing and wave radiation in non-Boussinesq internal bores

    DEFF Research Database (Denmark)

    Borden, Zac; Koblitz, Tilman; Meiburg, Eckart

    2012-01-01

    Bores, or hydraulic jumps, appear in many natural settings and are useful in many industrial applications. If the densities of the two fluids between which a bore propagates are very different (i.e., water and air), the less dense fluid can be neglected when modeling a bore analytically-a single...... ratio, defined as the ratio of the density of the lighter fluid to the heavier fluid, is greater than approximately one half. For smaller density ratios, undular waves generated at the bore's front dominate over the effects of turbulent mixing, and the expanding layer loses energy across the bore. Based...

  19. Removing well bore liquid blockage by gas injection

    International Nuclear Information System (INIS)

    Ahmed, Tarek

    2000-01-01

    Gas condensate reservoirs have long presented production problems when the pressure around the well bore drops below the dew point pressure. The formation of the condensate around the well bore can be thought of as an additional 'skin' that causes a reduction in the gas flow rates. Many processes have been used successfully to prevent or reduce the formation of liquids within the entire reservoir, such as pressure maintenance schemes and gas cycling processes. The pressure maintenance scheme is designed to keep the reservoir pressure at or above the dew point pressure while the gas cycling process is intended to reduce the liquid dropout by vaporization.Often times the pressure in the near-well bore region of the reservoir falls below the dew point pressure, while the pressure in the reservoir remains higher than the dew point pressure. As the near-well bore pressure drops below the dew point pressure, retrograde condensation occurs leading to the formation and then the mobilization of the condensate phase towards the producing wells. The liquid phase accumulates in the near Well bore region, forming a ring, which progressively reduces the gas deliverability. This study is designed to provide an insight into the mechanism of gas injection process in reducing gas-well productivity losses due to condensate blocking in the near well bore region. The study also evaluates the effectiveness of lean gas, N 2 , and CO 2 Huff 'n' Puff injection technique in removing the liquid dropout accumulation in and around the well bore. Results of the study show the importance of selecting the optimum injection volume and pressure. (author)

  20. Liver acquisition with volume acceleration flex on 70-cm wide-bore and 60-cm conventional-bore 3.0-T MRI.

    Science.gov (United States)

    Saito, Shigeyoshi; Tanaka, Keiko; Hashido, Takashi

    2016-07-01

    This study aimed to compare the uniformity of fat suppression and image quality between liver acquisition with volume acceleration flex (LAVA-Flex) and LAVA on 60-cm conventional-bore and 70-cm wide-bore 3.0-T magnetic resonance imaging (MRI). The uniformity of fat suppression by LAVA-Flex and LAVA was assessed as the efficiency of suppression of superficial fat at the levels of the liver dome, porta, and renal hilum. Percentage standard deviation (%SD) was calculated using the following equation: %SD (%) = 100 × SD of the regions of interest (ROIs)/mean value of the signal intensity (SI) in the ROIs. Signal-to-noise ratio (SNR) and contrast ratio (CR) were calculated. In the LAVA sequence, the %SD in all slices on wide-bore 3.0-T MRI was significantly higher than that on conventional-bore 3.0-T MRI (P 3.0-T MRI.

  1. Revisiting resolution in hydrodynamic countercurrent chromatography: tubing bore effect.

    Science.gov (United States)

    Berthod, A; Faure, K

    2015-04-17

    A major challenge in countercurrent chromatography (CCC), the technique that works with a support-free biphasic liquid system, is to retain the liquid stationary phase inside the CCC column (Sf parameter). Two solutions are commercially available: the hydrostatic CCC columns, also called centrifugal partition chromatographs (CPC), with disks of interconnected channels and rotary seals, and the hydrodynamic CCC columns with bobbins of coiled open tube and no rotary seals. It was demonstrated that the amount of liquid stationary phase retained by a coiled tube was higher with larger bore tubing than with small bore tubes. At constant column volume, small bore tubing will be longer producing more efficiency than larger bore tube that will better retain the liquid stationary phase. Since the resolution equation in CCC is depending on both column efficiency and stationary phase retention ratio, the influence of the tubing bore should be studied. This theoretical work showed that there is an optimum tubing bore size depending on solute partition coefficient and mobile phase flow rate. The interesting result of the theoretical study is that larger tubing bores allow for dramatically reduced experiment durations for all solutes: in reversed phase CCC (polar mobile phase), hydrophobic solutes are usually highly retained. These apolar solutes can be separated by the same coil at high flow rates and reduced Sf with similar retention times as polar solutes separated at smaller flow rates and much higher Sf. Copyright © 2015 Elsevier B.V. All rights reserved.

  2. Evaluation of an advanced rotor bore examination system

    International Nuclear Information System (INIS)

    Alford, J.W.

    1990-01-01

    Evaluations of in-service turbine-generator rotor forgings are often based on an ultrasonic examination of the near-bore region. A portable rotor bore examination system has been developed that provides discontinuity characterization required for a thorough rotor evaluation. This automated system, its procedures and operations personnel have now been qualified for full-scale field application. System development has benefited from merging several technologies with new methods for precise alignment of the drive unit, calibration block and rotor. The system runs a custom interactive software package that allows for flexible calibration and motion control as well as data acquisition and manipulation. A comprehensive evaluation procedure was developed for system qualification using test specimens with natural and artificial reflectors, including a unique fatigue-crack block. Following a discussion of the system features, this paper discusses the system evaluation based on this procedure

  3. Environmental impact of a flocculant used to enhance solids transport during well bore clean-up operations

    International Nuclear Information System (INIS)

    Yunus, M.N.M.; Procyk, A.D.; Malbrel, C.A.; Ling, K.L.C.

    1995-01-01

    This paper investigates particle flocculation as a mechanism to remove residual contaminants in well bores during completion operations. Laboratory tests and field trials were conducted demonstrating the ability of flocculating polymer sweeps to improve well bore cleaning efficiency. This process reduces the volume of fluid accumulated in the well bore that is discharged to the environment and minimizes the risk of formation damage by residuals left in the well bore. In addition, a comprehensive environmental impact study was performed on the flocculating polymers which included 72 hrs-EC50, 48 hrs-LC50, 10 day- LC50 tests on a variety of marine organisms, and bioaccumulation and biodegradability tests. In all cases, the flocculating polymers were shown to be environmentally safe at the recommended concentrations

  4. Respiratory-Gated MRgHIFU in Upper Abdomen Using an MR-Compatible In-Bore Digital Camera

    Directory of Open Access Journals (Sweden)

    Vincent Auboiroux

    2014-01-01

    Full Text Available Objective. To demonstrate the technical feasibility and the potential interest of using a digital optical camera inside the MR magnet bore for monitoring the breathing cycle and subsequently gating the PRFS MR thermometry, MR-ARFI measurement, and MRgHIFU sonication in the upper abdomen. Materials and Methods. A digital camera was reengineered to remove its magnetic parts and was further equipped with a 7 m long USB cable. The system was electromagnetically shielded and operated inside the bore of a closed 3T clinical scanner. Suitable triggers were generated based on real-time motion analysis of the images produced by the camera (resolution 640×480 pixels, 30 fps. Respiratory-gated MR-ARFI prepared MRgHIFU ablation was performed in the kidney and liver of two sheep in vivo, under general anaesthesia and ventilator-driven forced breathing. Results. The optical device demonstrated very good MR compatibility. The current setup permitted the acquisition of motion artefact-free and high resolution MR 2D ARFI and multiplanar interleaved PRFS thermometry (average SNR 30 in liver and 56 in kidney. Microscopic histology indicated precise focal lesions with sharply delineated margins following the respiratory-gated HIFU sonications. Conclusion. The proof-of-concept for respiratory motion management in MRgHIFU using an in-bore digital camera has been validated in vivo.

  5. Development of a screening procedure for vibrational fatigue in small bore piping

    International Nuclear Information System (INIS)

    Smith, J.K.; Riccardella, P.C.; Gosselin, S.R.

    1995-01-01

    Approximately 80% of the documented fatigue failures in nuclear power plants are caused by high cycle vibrational fatigue. These failures typically occur in socket welded pipe fittings in small bore piping (2 in. nominal diameter and smaller). These failures have been unexpected, and have caused costly, unscheduled outages in some cases. In order to reduce the number of vibrational fatigue failures in operating nuclear power plants, a vibrational fatigue screening procedure has been developed under Electric Power Research Institute (EPRI) sponsorship. The purpose of this paper is to describe this procedure, and to discuss topics related to vibrational fatigue failures. These topics include sources of vibration in nuclear power plants, the effect of socket welds on vibrational fatigue failures, vibrational fatigue screening criteria for small bore piping systems, and good design practices for reducing the number of vibrational fatigue failures in small bore piping

  6. Engine including a piston member having a high top ring groove

    Energy Technology Data Exchange (ETDEWEB)

    Weber, R.L.; Kamman, K.R.; Ballheimer, B.; Shoup, S.G.

    1990-07-17

    This patent describes an improvement in an engine. It is of the type having a block defining an upper bore, a cylinder liner located in the block bore and defining a piston bore, a cylinder head connected to the block, and a piston assembly including a steel piston member disposed for reciprocation in the piston bore.

  7. Development and demonstration of prototype transportation equipment for emplacing HL vitrified waste canisters into small diameter bored horizontal disposal cells

    International Nuclear Information System (INIS)

    Seidler, Wolf K.; Bosgiraud, Jean-Michel; Londe, Louis

    2008-01-01

    Over a period of 4 and years the National Radioactive Waste Management Agency (Andra), working with a variety of Contractors mostly specializing in nuclear orientated mechanical applications, successfully designed, fabricated and demonstrated 2 very different prototype high level waste transport systems. The first system, based on air cushion technology, was developed primarily for very heavy loads (17 to 45 tonnes). The results of this work are described in a separate presentation (Paper 21) at this Conference. The second system, developed by Andra within the framework of the ESDRED Project, generally referred to as the 'Pushing Robot System' for vitrified waste canisters, is the subject of this paper. The 'Pushing Robot System' is a part of the French national disposal concept that is described in Andra's 'Dossier 2005'. The latter is a public document that can be viewed on Andra's web site (www.andra.fr). The 'Pushing Robot System' system is designed for the deep geological disposal (in clay formations) of 'C' type vitrified waste canisters. In its entirety the system provides for the transport, emplacement and, if necessary, the retrieval of those canisters. Nothing in the design of the Andra emplacement equipment would preclude its utilization in horizontal openings in other types of geological settings. Over a period of some 8 years Andra has developed the 'Pushing Robot System' in 3 phases. Initially there was only the 'Conceptual Design' (Phase 1) which was incorporated in the Dossier 2005. This was followed by Phase 2 i.e. the design and fabrication of a simplified full scale prototype system henceforth referred to a P1, which includes a Pushing Robot, a Dummy Canister and a Test Bench. P1 details were also incorporated in the Dossier 2005. Finally, during Phase 3, a second more comprehensive full scale prototype system P2 has been designed and is being assembled and tested this month. This system includes a Transport Shuttle, a Transfer Shielding Cask, a

  8. Measurement of Antenna Bore-Sight Gain

    Science.gov (United States)

    Fortinberry, Jarrod; Shumpert, Thomas H.

    2016-01-01

    The absolute or free-field gain of a simple antenna can be approximated using standard antenna theory formulae or for a more accurate prediction, numerical methods may be employed to solve for antenna parameters including gain. Both of these methods will result in relatively reasonable estimates but in practice antenna gain is usually verified and documented via measurements and calibration. In this paper, a relatively simple and low-cost, yet effective means of determining the bore-sight free-field gain of a VHF/UHF antenna is proposed by using the Brewster angle relationship.

  9. Investigation on vibrational evaluation criteria for small-bore pipe

    International Nuclear Information System (INIS)

    Tsuji, Takashi; Maekawa, Akira; Takahashi, Tsuneo; Kato, Minoru; Torigoe, Yuichi

    2013-01-01

    The well-known organization such as API and SwRI in USA developed criteria for piping vibrational evaluation. These criteria are targeted for main pipes, but not branch pipes with small bore. In this study, applicability of criteria of API and SwRI to branch pipes was investigated. Vibration test using piping system with small bore branch pipe was conducted and amplitudes of vibrational stress and displacement were measured for various exciting force. In comparison of the measurements with the two criteria, though the criteria of API and SwRI were applicable to small bore branch pipe, they made too conservative evaluation. (author)

  10. Analysis of Driven Pile Capacity within Pre-Bored Soil : Research Project Capsule

    Science.gov (United States)

    2017-10-01

    Pre-boring is a method used to facilitate large displacement pile driving in hard/dense soils (see Figure 1). By pre-boring a pilot hole, the end bearing and side friction within the pre-bored zone are reduced, thus aiding pile driving installation. ...

  11. Large-bore pipe decontamination

    International Nuclear Information System (INIS)

    Ebadian, M.A.

    1998-01-01

    The decontamination and decommissioning (D and D) of 1200 buildings within the US Department of Energy-Office of Environmental Management (DOE-EM) Complex will require the disposition of miles of pipe. The disposition of large-bore pipe, in particular, presents difficulties in the area of decontamination and characterization. The pipe is potentially contaminated internally as well as externally. This situation requires a system capable of decontaminating and characterizing both the inside and outside of the pipe. Current decontamination and characterization systems are not designed for application to this geometry, making the direct disposal of piping systems necessary in many cases. The pipe often creates voids in the disposal cell, which requires the pipe to be cut in half or filled with a grout material. These methods are labor intensive and costly to perform on large volumes of pipe. Direct disposal does not take advantage of recycling, which could provide monetary dividends. To facilitate the decontamination and characterization of large-bore piping and thereby reduce the volume of piping required for disposal, a detailed analysis will be conducted to document the pipe remediation problem set; determine potential technologies to solve this remediation problem set; design and laboratory test potential decontamination and characterization technologies; fabricate a prototype system; provide a cost-benefit analysis of the proposed system; and transfer the technology to industry. This report summarizes the activities performed during fiscal year 1997 and describes the planned activities for fiscal year 1998. Accomplishments for FY97 include the development of the applicable and relevant and appropriate regulations, the screening of decontamination and characterization technologies, and the selection and initial design of the decontamination system

  12. Continuous measurements of in-bore projectile velocity

    International Nuclear Information System (INIS)

    Asay, J.R.; Konrad, C.H.; Hall, C.A.; Shahinpoor, M.

    1989-01-01

    The application of velocity interferometry to the continuous measurement of in-bore projectile velocity in a small-bore three-stage railgun is described. These measurements are useful for determining projectile acceleration and for evaluating gun performance. The launcher employed in these studies consists of a two-stage light gas gun used to inject projectiles into a railgun for additional acceleration. Results obtained for projectile velocities to 7.4 km/s with the two-stage injector are reported and potential improvements for railgun applications are discussed

  13. Tunnel boring machine applications

    International Nuclear Information System (INIS)

    Bhattacharyya, K.K.; McDonald, R.; Saunders, R.S.

    1992-01-01

    This paper reports that characterization of Yucca Mountain for a potential repository requires construction of an underground Exploratory Studies Facility (ESF). Mechanical excavating methods have been proposed for construction of the ESF as they offer a number of advantages over drilling and blasting at the Yucca Mountain site, including; less ground disturbance and therefore a potential for less adverse effects on the integrity of the site, creation of a more stable excavation cross section requiring less ground support, and an inherently safer and cleaner working environment. The tunnel boring machine (TBM) provides a proven technology for excavating the welded and unwelded Yucca Mountain tuffs. The access ramps and main underground tunnels form the largest part of the ESF underground construction work, and have been designed for excavation by TBM

  14. Tunnelling in Soft Soil : Tunnel Boring Machine Operation and Soil Response

    NARCIS (Netherlands)

    Festa, D.; Broere, W.; Bosch, J.W.

    2013-01-01

    Constructing tunnels in soft soil with the use of Tunnel Boring Machines may induce settlements including soil movements ahead of the face, soil relaxation into the tail void, possible heave due to grouting, long lasting consolidation processes, and potentially several other mechanisms. A

  15. Large Bore Powder Gun Qualification (U)

    Energy Technology Data Exchange (ETDEWEB)

    Rabern, Donald A. [Los Alamos National Laboratory; Valdiviez, Robert [Los Alamos National Laboratory

    2012-04-02

    A Large Bore Powder Gun (LBPG) is being designed to enable experimentalists to characterize material behavior outside the capabilities of the NNSS JASPER and LANL TA-55 PF-4 guns. The combination of these three guns will create a capability to conduct impact experiments over a wide range of pressures and shock profiles. The Large Bore Powder Gun will be fielded at the Nevada National Security Site (NNSS) U1a Complex. The Complex is nearly 1000 ft below ground with dedicated drifts for testing, instrumentation, and post-shot entombment. To ensure the reliability, safety, and performance of the LBPG, a qualification plan has been established and documented here. Requirements for the LBPG have been established and documented in WE-14-TR-0065 U A, Large Bore Powder Gun Customer Requirements. The document includes the requirements for the physics experiments, the gun and confinement systems, and operations at NNSS. A detailed description of the requirements is established in that document and is referred to and quoted throughout this document. Two Gun and Confinement Systems will be fielded. The Prototype Gun will be used primarily to characterize the gun and confinement performance and be the primary platform for qualification actions. This gun will also be used to investigate and qualify target and diagnostic modifications through the life of the program (U1a.104 Drift). An identical gun, the Physics Gun, will be fielded for confirmatory and Pu experiments (U1a.102D Drift). Both guns will be qualified for operation. The Gun and Confinement System design will be qualified through analysis, inspection, and testing using the Prototype Gun for the majority of process. The Physics Gun will be qualified through inspection and a limited number of qualification tests to ensure performance and behavior equivalent to the Prototype gun. Figure 1.1 shows the partial configuration of U1a and the locations of the Prototype and Physics Gun/Confinement Systems.

  16. Wood-Boring Bivalves (Mollusca: Teredinidae, Pholadidae) of Pacific coast of Colombia

    International Nuclear Information System (INIS)

    Cantera K, Jaime R

    2010-01-01

    Twelve species of wood-boring bivalves, ten of the family Teredinidae and two of family Pholadidae were collected in mangroves at 6 locations of the Pacific coast of Colombia. This paper presents a brief escription of these species, including size, ecological notes and geographical distribution.

  17. Hazardous situation in the MR bore: induction in ECG leads causes fire

    International Nuclear Information System (INIS)

    Kugel, Harald; Bremer, Christoph; Fischbach, Roman; Lenzen, Horst; Tombach, Bernd; Heindel, Walter; Pueschel, Marco; Aken, Hugo van

    2003-01-01

    There is a potential hazard during examinations of patients with attached or implanted long conductors, e.g. ECG leads: an MR exam of the lumbar spine of a patient was performed in a 1.5-T scanner under ECG monitoring using equipment marked as MR compatible. Standard cabling of 370-cm length was guided without loops from the electrodes through the caudal opening of the magnet bore. During a sagittal T1-weighted turbo-spin-echo scan suddenly a flame of approximately 3 cm arose from the patient's shirt, close to the position of the electrodes. The supervising anaesthesiologist extinguished the flames with his hands. A subsequent physical examination revealed second- to third-degree burns. The analysis of the incident revealed that high voltages can be induced in straight conductors without loops as ECG cables by coupling with the electric component of the HF field. Local heating or sparking can cause an open flame at the position of the electrodes. This danger exists even with ECG equipment that is specifically marked as MR compatible. (orig.)

  18. Formulating entompathogens for control of boring beetles in avocado orchards

    Science.gov (United States)

    A foam formulation of Beauveria bassiana was adapted to control boring beetles in avocado orchards. The two geographically independent avocado growing areas in the United States are threatened by emerging diseases vectored by boring beetles. In the California growing region, Fusarium dieback is vect...

  19. Improvement of the center boring device for the irradiated fuel pellets

    Energy Technology Data Exchange (ETDEWEB)

    Usami, Koji; Onozawa, Atsushi; Kimura, Yasuhiko; Sakuraba, Naotoshi; Shiina, Hidenori; Harada, Akito; Nakata, Masahito [Japan Atomic Energy Agency, Nuclear Science Research Inst., Tokai, Ibaraki (Japan)

    2012-03-15

    The power ramp tests performed at JMTR in Oarai R and D Center are objected to study the safety margin of the high burnup fuels. One of the important parameters measured during this test is the center temperature of the fuel pellet. For this measurement, a thermocouple is installed into the hole bored at the pellet center by the center boring device, which can fix the fuel pellet with the frozen CO{sub 2} gas during its boring process. At the Reactor Fuel Examination Facility (RFEF) in Tokai R and D Center, several improvements were applied for the previous boring device to gain its performance and reliability. The major improvements are the change of the drill bit, modification of the boring process and the optimization of the remote operability. The mock-up test will be performed with the irradiated fuel pellet to confirm the benefit of improvement. This study was conducted under a contract with the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI). (author)

  20. Boring crustaceans damage polystyrene floats under docks polluting marine waters with microplastic.

    Science.gov (United States)

    Davidson, Timothy M

    2012-09-01

    Boring isopods damage expanded polystyrene floats under docks and, in the process, expel copious numbers of microplastic particles. This paper describes the impacts of boring isopods in aquaculture facilities and docks, quantifies and discusses the implications of these microplastics, and tests if an alternate foam type prevents boring. Floats from aquaculture facilities and docks were heavily damaged by thousands of isopods and their burrows. Multiple sites in Asia, Australia, Panama, and the USA exhibited evidence of isopod damage. One isopod creates thousands of microplastic particles when excavating a burrow; colonies can expel millions of particles. Microplastics similar in size to these particles may facilitate the spread of non-native species or be ingested by organisms causing physical or toxicological harm. Extruded polystyrene inhibited boring, suggesting this foam may prevent damage in the field. These results reveal boring isopods cause widespread damage to docks and are a novel source of microplastic pollution. Copyright © 2012 Elsevier Ltd. All rights reserved.

  1. Quality Designed Twin Wire Arc Spraying of Aluminum Bores

    Science.gov (United States)

    König, Johannes; Lahres, Michael; Methner, Oliver

    2015-01-01

    After 125 years of development in combustion engines, the attractiveness of these powerplants still gains a great deal of attention. The efficiency of engines has been increased continuously through numerous innovations during the last years. Especially in the field of motor engineering, consequent friction optimization leads to cost-effective fuel consumption advantages and a CO2 reduction. This is the motivation and adjusting lever of NANOSLIDE® from Mercedes-Benz. The twin wire arc-spraying process of the aluminum bore creates a thin, iron-carbon-alloyed coating which is surface-finished through honing. Due to the continuous development in engines, the coating strategies must be adapted in parallel to achieve a quality-conformed coating result. The most important factors to this end are the controlled indemnification of a minimal coating thickness and a homogeneous coating deposition of the complete bore. A specific system enables the measuring and adjusting of the part and the central plunging of the coating torch into the bore to achieve a homogeneous coating thickness. Before and after measurement of the bore diameter enables conclusions about the coating thickness. A software tool specifically developed for coating deposition can transfer this information to a model that predicts the coating deposition as a function of the coating strategy.

  2. Shaft Boring Machine: A method of mechanized vertical shaft excavation

    International Nuclear Information System (INIS)

    Goodell, T.M.

    1991-01-01

    The Shaft Boring Machine (SBM) is a vertical application of proven rock boring technology. The machine applies a rotating cutter wheel with disk cutters for shaft excavation. The wheel is thrust against the rock by hydraulic cylinders and slews about the shaft bottom as it rotates. Cuttings are removed by a clam shell device similar to conventional shaft mucking and the muck is hoisted by buckets. The entire machine moves down (and up) the shaft through the use of a system of grippers thrust against the shaft wall. These grippers and their associated cylinders also provide the means to maintain verticality and stability of the machine. The machine applies the same principles as tunnel boring machines but in a vertical mode. Other shaft construction activities such as rock bolting, utility installation and shaft concrete lining can be accomplished concurrent with shaft boring. The method is comparable in cost to conventional sinking to a depth of about 460 meters (1500 feet) beyond which the SBM has a clear host advantage. The SBM has a greater advantage in productivity in that it can excavate significantly faster than drill and blast methods

  3. Evaluation methods of vibration stress of small bore piping

    Energy Technology Data Exchange (ETDEWEB)

    Hiramatsu, Miki; Sasaki, Toru [Institute of Nuclear Safety System Inc., Mihama, Fukui (Japan)

    2001-09-01

    Fatigue fracture by vibration stress is one of the main causes of troubles which occur at small bore piping in nuclear power plants. Therefore at the plants they manage small bore piping using a method in which their vibration accelerations are measured and the vibration stresses are calculated. In this work, vibration tests for two sets of mock-ups simulating actual piping in the plants by sinusoidal oscillation and by that obtained at an actual plant were carried out, and then an evaluation method was developed to obtain proper value of vibration stress from the measured data by the vibration tests. In comparison of the vibration stress obtained from the measured acceleration with that directly measured using strain gauges, it is confirmed that accurate vibration stress can be evaluated by a formula in which the real center of gravity of small bore piping and the acceleration of main (system) piping are considered. (author)

  4. Tunnel boring an alternative method in construction of spent fuel repositories

    International Nuclear Information System (INIS)

    Christersson, Jukka

    1984-05-01

    In projecting of the final disposal of nuclear waste in geological formations a great importance should be paid to the selection of the tunneling method. The environment of the chosen repository area should not be exposed to any but as minor disturbances as possible by the excavation method applied. This study approaches full face tunneling methods as an alternative to conventional drill-and-blast methods in the construction of spent fuel repository tunnels. According to experiences up till now it is obvious, that tunnelboring today is fully capable technically competing with conventional tunneling methods, even in the hardest granitic rocks. The most important advantages, it provides for the construction of repositories, are: The methods does not produce any damage in the surrounding rock. Possibility to use placement techniques, which do not require preparing of additive repository holes for the fuel elements. Saving in the use of expensive filling material. The fact, that tunnel boring in hard rock is an expensive alternative, is still valid. Constuction of straight lined tunnels in unfractured rocks by tunnel boring would cost about 30-40% more than by conventional methods. The lay out arrangement of bored tunnels still have a great influence on tunnel boring machine's economy. Due to this it would be round 40-70% more expensive method in the construction of spent fuel repositories. However intensive development w is being carried out to eliminate these limitations and to make machines more flexible. Future trends in tunnel boring look good at the moment. The number of sold units has been increasing and new applications have widen out during last ten years. Harder and more abrasive rocks can now be bored than ever before and the trend seems to continue. It also looks like the cost difference in the hardest rocks is firmly getting smaller and smaller all the time. (author)

  5. Automating horizontal boring and milling machine

    International Nuclear Information System (INIS)

    Naqvi, S.A.R.; Mahmood, T.; Choudhry, M.A.; Hanif, A.

    2012-01-01

    Aiming at the requirements of modification for many old import machine tools in industry, the schemes suited to the renovation are presented in this paper. A horizontal boring and milling machine (HBM) involved in machining of tank Al-Khalid has been modified using Mitsubishi FX-1N and FX-2N PLC. The developed software is for control of all the functions of the said machine. These functions include power on/off oil pump, spindle rotation and machine movement in all axes. All the decisions required by the machine for actuation of instructions are based on the data acquired from the control panel, timers and limit switches. Also the developed software minimize the down time, safety of operator and error free actuation of instructions. (author)

  6. Development of Inspection Technique for Socket Weld of Small Bore Piping in Nuclear Power Plant

    International Nuclear Information System (INIS)

    Yoon, Byungsik; Kim, Yongsik; Lee, Jeongseok

    2013-01-01

    The losses incurred by unplanned shutdowns are significant; consequently, early crack initiation and crack detection, including the detection of fillet weld manufacturing defects, is of the utmost importance. Current inspection techniques are not capable of reliably inspecting socket welds; therefore, new approaches are needed. The new technique must be sensitive to socket weld cracking, which usually initiates from the root, in order to detect the cracking during the early failure phase. In 2008, Kori unit 3 experienced leakage from the drain line socket weld of a steam generator. From this experience, KHNP enforced a management program to focus on enhancing the reliability of small bore socket weld piping inspections. Currently, conventional manual ultrasonic inspection techniques are used to detect service induced fatigue cracks. But there was uncertainty on manual ultrasonic inspection because of limited access to the welds and difficulties with contact between the ultrasonic probe and the OD surface of small bore piping. In this study, phased array ultrasonic inspection techniques are applied to increase inspection speed and reliability. Additionally a manually encoded scanner has been developed to enhance contact conditions and maintain constant signal quality. A phased array UT technique and system was developed to inspect small bore socket welds. The experimental results show all artificial flaws in the specimen were detected and measured. These experimental results show, that the newly developed inspection system, has improved the reliability and speed of small bore socket weld inspection. Based on these results, future works shall focus on additional experiments, with more realistic flaw responses. By applying this technique to the field, we expect that it can improve the integrity of small bore piping in nuclear power plants

  7. Procedure for seismic evaluation and design of small bore piping

    International Nuclear Information System (INIS)

    Bilanin, W.; Sills, S.

    1991-01-01

    Simplified methods for the seismic design of small bore piping in nuclear power plants have teen used for many years. Various number of designers have developed unique methods to treat the large number of class 2 and 3 small bore piping systems. This practice has led to a proliferation of methods which are not standardized in the industry. These methods are generally based on enveloping the results of rigorous dynamic or conservative static analysis and result in an excessive number of supports and unrealistically high support loadings. Experience and test data have become available which warranted taking another look at the present methods for analysis of small bore piping. A recently completed Electric Power Research Institute and NCIG (a utility group) activity developed a new procedure for the seismic design and evaluation of small bore piping which provides significant safety and cost benefits. The procedure streamlines the approach to inertial stresses, which is the main feature that achieves the new benefits. Criteria in the procedure for seismic anchor movement and support design are based analysis and focus the designer on credible failure mechanisms. A walkdown of the as-constructed piping system to identify and eliminate undesirable piping features such as adverse spatial interaction is required

  8. Empyema and Effusion: Outcome of Image-Guided Small-Bore Catheter Drainage

    International Nuclear Information System (INIS)

    Keeling, A. N.; Leong, S.; Logan, P. M.; Lee, M. J.

    2008-01-01

    Empyema and complicated pleural effusion represent common medical problems. Current treatment options are multiple. The purpose of this study was to access the outcome of image-guided, small-bore catheter drainage of empyema and effusion. We evaluated 93 small-bore catheters in 82 patients with pleural effusion (n = 30) or empyema (n = 52), over a 2-year period. Image guidance was with ultrasound (US; n = 56) and CT (n = 37). All patients were followed clinically, with catheter dwell times, catheter outcome, pleural fluid outcome, reinsertion rates, and need for urokinase or surgery recorded. Ninety-three small-bore chest drains (mean=10.2 Fr; range, 8.2-12.2 Fr) were inserted, with an average dwell time of 7.81 days for empyemas and 7.14 days for effusions (p > 0.05). Elective removal rates (73% empyema vs 86% effusions) and dislodgement rates (12% empyema vs 13% effusions) were similar for both groups. Eight percent of catheters became blocked and 17% necessitated reinsertion in empyemas, with no catheters blocked or requiring reinsertion in effusions (p < 0.05). Thirty-two patients (51%) required urokinase in the empyema group, versus 2 patients (6%) in the effusion group (p < 0.05). All treatment failures, requiring surgery, occurred in the empyema group (19%; n = 12; p < 0.05). In conclusion, noninfected pleural collections are adequately treated with small-bore catheters, however, empyemas have a failure rate of 19%. The threshold for using urokinase and larger-bore catheters should be low in empyema

  9. Edwin G. Boring: The Historian's Path in the Pages of The American Journal of Psychology.

    Science.gov (United States)

    Gallagher, Shawn R

    2017-01-01

    Although he is best known for his classic textbook, A History of Experimental Psychology, Edwin Garrigues Boring published dozens of articles in The American Journal of Psychology and used its various formats to guide the discipline in the early 20th century. This report reviews a small sample of his publications, including obituaries, notes, and experimental articles, and presents them in historical and biographical context. A central objective is to show how Boring shared the values of his structuralist training with the emerging American schools and how time allowed him to reconsider his approach to history and the legacy of his iconic mentor, Edward Bradford Titchener.

  10. Construction of a cylindrical brine test room using a tunnel boring machine

    International Nuclear Information System (INIS)

    Likar, V.F.; Burrington, T.P.

    1990-01-01

    This paper discusses the construction of a horizontal cylindrical brine test room at the Waste Isolation Pilot Plant (WIPP). The room was constructed in the bedded salt formation at a depth of 655 meters with a tunnel boring machine. The machine leasing technical and operational management, parameters involved, and successful completion of this effort are included. 3 figs

  11. Construction of a cylindrical brine test room using a tunnel boring machine

    International Nuclear Information System (INIS)

    Likar, V.F.; Burrington, T.P.

    1990-01-01

    This paper discusses the construction of a horizontal cylindrical brine test room at the Waste Isolation Pilot Plant (WIPP). The room was constructed in the bedded salt formation at a depth of 655 meters with a tunnel boring machine. The machine leasing, technical and operational management, parameters involved, and successful completion of this effort are included. 3 figs

  12. Ten Years of bored tunnels in the Netherlands : Part I: Geotechnical issues

    NARCIS (Netherlands)

    Bakker, K.J.; Bezuijen, A.

    2008-01-01

    Ten years have passed since in 1997 for the first time construction of bored tunnels in the Netherlands soft soil was undertaken. Before that date essentially only immersed tunnels and cut-and-cover tunnels were constructed in the Netherlands. The first two bored tunnels were Pilot Projects, the 2nd

  13. Tunnel Boring Machine Performance Study. Final Report

    Science.gov (United States)

    1984-06-01

    Full face tunnel boring machine "TBM" performance during the excavation of 6 tunnels in sedimentary rock is considered in terms of utilization, penetration rates and cutter wear. The construction records are analyzed and the results are used to inves...

  14. Analysis on pile testing results of post-grouting bored pile

    Science.gov (United States)

    Zheng, A. R.

    2017-04-01

    Based on static load test results, the bearing capacity of bored piles with pile-toe and pile-shaft post-grouting has been analyzed. The analysis reveals that: with post-grouting, the interface between pile and surrounding soil are strengthened and the relative sliding displacement in between is reduced; end resistance of pile is enhanced and can be mobilized at earlier stage with smaller sliding displacement. As a result, the performance of bored pile is improved with increased bearing capacity and reduced settlement.

  15. A Computer-Controlled Laser Bore Scanner

    Science.gov (United States)

    Cheng, Charles C.

    1980-08-01

    This paper describes the design and engineering of a laser scanning system for production applications. The laser scanning techniques, the timing control, the logic design of the pattern recognition subsystem, the digital computer servo control for the loading and un-loading of parts, and the laser probe rotation and its synchronization will be discussed. The laser inspection machine is designed to automatically inspect the surface of precision-bored holes, such as those in automobile master cylinders, without contacting the machined surface. Although the controls are relatively sophisticated, operation of the laser inspection machine is simple. A laser light beam from a commercially available gas laser, directed through a probe, scans the entire surface of the bore. Reflected light, picked up through optics by photoelectric sensors, generates signals that are fed to a mini-computer for processing. A pattern recognition techniques program in the computer determines acceptance or rejection of the part being inspected. The system's acceptance specifications are adjustable and are set to the user's established tolerances. However, the computer-controlled laser system is capable of defining from 10 to 75 rms surface finish, and voids or flaws from 0.0005 to 0.020 inch. Following the successful demonstration with an engineering prototype, the described laser machine has proved its capability to consistently ensure high-quality master brake cylinders. It thus provides a safety improvement for the automotive braking system. Flawless, smooth cylinder bores eliminate premature wearing of the rubber seals, resulting in a longer-lasting master brake cylinder and a safer and more reliable automobile. The results obtained from use of this system, which has been in operation about a year for replacement of a tedious, manual operation on one of the high-volume lines at the Bendix Hydraulics Division, have been very satisfactory.

  16. Cutting tool for removing materials from well bore

    International Nuclear Information System (INIS)

    Lynde, G.D.; Harvey, H.H. Jr.

    1991-01-01

    This patent describes a cutting tool adapted to be positioned downhole in a well bore for removing a metal member from the well bore; a tool body adapted to be received within said well bore and to be supported at its upper end for rotation about a longitudinal axis; blades at spaced intervals on the body and extending outwardly therefrom, each of the blades having a base with a leading surface relative to the direction of rotation; closely spaced cutting elements of hard cutting material secured to said leading surface of the base in a plurality of transversely extending rows, each cutting element being of a predetermined size and shape and arranged in a predetermined generally symmetrical pattern on the base relative to the other elements, each of said cutting elements having an exposed from cutting face forming a cutting surface, a rear face secured to the leading surface of said base, a peripheral surface extending between said faces, and a relatively sharp edge formed at the juncture of the front face and peripheral surface; the front cutting face of each cutting element being arranged and constructed for directing an extending end portion of a turning cut form said member to effect a breaking of said turning from the member being cut in a predetermined manner to minimize interesting of the turning

  17. Arrival of the Robbins machine in LSS1 after completing the boring of the SPS tunnel.

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    A few months after the signature of the agreement giving the go-ahead for the expansion of CERN into French territory (see Bulletin no.24/2004), work began on the Super Proton Synchrotron (SPS). Two years later, on 31 July 1974, the Robbins tunnel-boring machine excavating the SPS tunnel returned to its starting point (see photograph). It had excavated a tunnel with a circumference of 7 kilometres, at an average depth of 40 metres below the surface. The tunnel straddled the Franco-Swiss border, making the SPS the first cross-border accelerator. More than a thousand magnets were needed to equip the ring. The civil engineering and installation work was completed in record time after only four years. The SPS was equipped with a control system which was ahead of its time, consisting of 24 small control computers distributed in the tunnel and the control room and communicating by means of a high-rate data transmission system. The main control room housed only four consoles as opposed to the banks of electronic eq...

  18. Borehole imaging tool detects well bore fractures

    International Nuclear Information System (INIS)

    Ma, T.A.; Bigelow, E.L.

    1993-01-01

    This paper reports on borehole imaging data which can provide high quality geological and petrophysical information to improve fracture identification, dip computations, and lithology determinations in a well bore. The ability to visually quantify the area of a borehole wall occupied by fractures and vugs enhances reservoir characterization and well completion operations. The circumferential borehole imaging log (CBIL) instrument is an acoustic logging device designed to produce a map of the entire borehole wall. The visual images can confirm computed dips and the geological features related to dip. Borehole geometry, including breakout, are accurately described by complete circumferential caliper measurements, which is important information for drilling and completion engineers. In may reservoirs, the images can identify porosity type, bedding characteristics, and petrophysical parameters

  19. YUCCA MOUNTAIN SITE CHARACTERIZATIONS PROJECT TUNNEL BORING MACHINE (TBM) SYSTEM SAFETY ANALYSIS

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of this analysis is to systematically identify and evaluate hazards related to the tunnel boring machine (TBM) used in the Exploratory Studies Facility (ESF) at the Yucca Mountain Site Characterization Project. This process is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. Since the TBM is an ''as built'' system, the MandO is conducting the System Safety Analysis during the construction or assembly phase of the TBM. A largely qualitative approach was used since a radiological System Safety Analysis is not required. The risk assessment in this analysis characterizes the accident scenarios associated with the TBM in terms of relative risk and includes recommendations for mitigating all identified risks. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into the system/subsystem/component design, (2) add safety features and capabilities to existing designs, and (3) develop procedures and conduct training to increase worker awareness of potential hazards, on methods to reduce exposure to hazards, and on the actions required to avoid accidents or correct hazardous conditions. The scope of this analysis is limited to the TBM during normal operations, excluding hazards occurring during assembly and test of the TBM or maintenance of the TBM equipment

  20. YUCCA MOUNTAIN SITE CHARACTERIZATIONS PROJECT TUNNEL BORING MACHINE (TBM) SYSTEM SAFETY ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1997-02-19

    The purpose of this analysis is to systematically identify and evaluate hazards related to the tunnel boring machine (TBM) used in the Exploratory Studies Facility (ESF) at the Yucca Mountain Site Characterization Project. This process is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. Since the TBM is an ''as built'' system, the M&O is conducting the System Safety Analysis during the construction or assembly phase of the TBM. A largely qualitative approach was used since a radiological System Safety Analysis is not required. The risk assessment in this analysis characterizes the accident scenarios associated with the TBM in terms of relative risk and includes recommendations for mitigating all identified risks. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into the system/subsystem/component design, (2) add safety features and capabilities to existing designs, and (3) develop procedures and conduct training to increase worker awareness of potential hazards, on methods to reduce exposure to hazards, and on the actions required to avoid accidents or correct hazardous conditions. The scope of this analysis is limited to the TBM during normal operations, excluding hazards occurring during assembly and test of the TBM or maintenance of the TBM equipment.

  1. West Germany's super-deep boring project KTB. To make thw world deepest dream come true

    Energy Technology Data Exchange (ETDEWEB)

    Urabe, Tetsuro [Geological Survey of Japan, Tsukuba, (Japan)

    1989-07-01

    West Germany has started a project of the world deepest boring of 14km depth which requires more than 10 years and as much as 40 billion yen. This is a national project of scientific research called Continental Deep Boring Project(abbreviated as KTB). This project was proposed by the West German Research Association about 10 years ago, and pre-investigation, technical investigation and selection of proper field were started in 1981. The project was approved by the Federal Research Technology Ministry in 1985 and was started with the overall budget(upper limit) of 450 million Deutchemarks. At present, a 5,000m deep well for the investigation of the shallow part is being drilled, and mud analysis and core analysis are being carried out. Super deep drilling is comprehensive system engineering that includes the robotizing of lifts, the development of drill pipe material which is strong and light enough not to be torn by its own weight, the improvement of the turbo drill bit, and the development of heat resisting and pressure-tight semiconductor for in-the-bore-measuring instruments. In West Germany, the official, civil and academic circles participate in this project. 18 figs., 2 tabs.

  2. Grouting guidelines for Hanford Tanks Initiative cone penetrometer borings

    International Nuclear Information System (INIS)

    Iwatate, D.F.

    1998-01-01

    Grouting of an open cone penetrometer (CP) borehole is done to construct a barrier that prevents the vertical migration of fluids and contaminants between geologic units and aquifers intersected by the boring. Whether to grout, the types of grout, and the method of deployment are functions of the site-specific conditions. This report recommends the strategy that should be followed both before and during HTI [Hanford Tanks Initiative] CP deployment to decide specific borehole grouting needs at Hanford SST farms. Topics discussed in this report that bear on this strategy include: Regulatory guidance, hydrogeologic conditions, operational factors, specific CP grouting deployment recommendations

  3. Estimation of Tsunami Bore Forces on a Coastal Bridge Using an Extreme Learning Machine

    Directory of Open Access Journals (Sweden)

    Iman Mazinani

    2016-04-01

    Full Text Available This paper proposes a procedure to estimate tsunami wave forces on coastal bridges through a novel method based on Extreme Learning Machine (ELM and laboratory experiments. This research included three water depths, ten wave heights, and four bridge models with a variety of girders providing a total of 120 cases. The research was designed and adapted to estimate tsunami bore forces including horizontal force, vertical uplift and overturning moment on a coastal bridge. The experiments were carried out on 1:40 scaled concrete bridge models in a wave flume with dimensions of 24 m × 1.5 m × 2 m. Two six-axis load cells and four pressure sensors were installed to the base plate to measure forces. In the numerical procedure, estimation and prediction results of the ELM model were compared with Genetic Programming (GP and Artificial Neural Networks (ANNs models. The experimental results showed an improvement in predictive accuracy, and capability of generalization could be achieved by the ELM approach in comparison with GP and ANN. Moreover, results indicated that the ELM models developed could be used with confidence for further work on formulating novel model predictive strategy for tsunami bore forces on a coastal bridge. The experimental results indicated that the new algorithm could produce good generalization performance in most cases and could learn thousands of times faster than conventional popular learning algorithms. Therefore, it can be conclusively obtained that utilization of ELM is certainly developing as an alternative approach to estimate the tsunami bore forces on a coastal bridge.

  4. Simulation of bearing capacity of bored piles

    Directory of Open Access Journals (Sweden)

    Majeed Ahmed

    2018-01-01

    Full Text Available This study focuses on how one can possibly predict the ultimate load for the piles that did not reach failure. This challenge was acquired through Chin- Konder method by which, the estimated settlement that correspond to failure load is well defined. Hence, this research aims to make a comparative study between the results of pile load tests carried out in Al-Basrah sewage treatment plant project, and those results induced from the numerical analysis in term of ultimate pile capacity. Consequently, it may give a clear idea on the ability of numerical simulation in getting close to the actual behavior of piles. In the current study, a numerical study using Plaxis 3D Foundation program has been performed on bored piles by the assistance of site investigations of soil. Mohr- Coulomb and linear elastic models were adopted in the simulation for soil and pile respectively. Ten bored piles were used in this analysis under different values of loading. The diameter and length of pile are 0.6m and 24m respectively. The test results indicate that, an excellent agreement has been found as a response of pile capacity between the field and numerical studies. Also, ideal load- settlement curves were created using Chin- Konder method to predict the failure load of bored piles. Also, the results have demonstrated that, the pile capacity obtained from the simulation process is larger about 51% than that design load estimated before the design of piles. This may present a priority to use the finite element method to be accounted as an effective approach in the primary analysis.

  5. In-bore setup and software for 3T MRI-guided transperineal prostate biopsy

    International Nuclear Information System (INIS)

    Tokuda, Junichi; Tuncali, Kemal; Song, Sang-Eun; Fedorov, Andriy; Oguro, Sota; Fennessy, Fiona M; Tempany, Clare M; Hata, Nobuhiko; Iordachita, Iulian; Lasso, Andras

    2012-01-01

    MRI-guided prostate biopsy in conventional closed-bore scanners requires transferring the patient outside the bore during needle insertion due to the constrained in-bore space, causing a safety hazard and limiting image feedback. To address this issue, we present our custom-made in-bore setup and software to support MRI-guided transperineal prostate biopsy in a wide-bore 3 T MRI scanner. The setup consists of a specially designed tabletop and a needle-guiding template with a Z-frame that gives a physician access to the perineum of the patient at the imaging position and allows the physician to perform MRI-guided transperineal biopsy without moving the patient out of the scanner. The software and Z-frame allow registration of the template, target planning and biopsy guidance. Initially, we performed phantom experiments to assess the accuracy of template registration and needle placement in a controlled environment. Subsequently, we embarked on our clinical trial (N = 10). The phantom experiments showed that the translational errors of the template registration along the right–left (RP) and anterior–posterior (AP) axes were 1.1 ± 0.8 and 1.4 ± 1.1 mm, respectively, while the rotational errors around the RL, AP and superior–inferior axes were (0.8 ± 1.0)°, (1.7 ± 1.6)° and (0.0 ± 0.0)°, respectively. The 2D root-mean-square (RMS) needle-placement error was 3 mm. The clinical biopsy procedures were safely carried out in all ten clinical cases with a needle-placement error of 5.4 mm (2D RMS). In conclusion, transperineal prostate biopsy in a wide-bore 3T scanner is feasible using our custom-made tabletop setup and software, which supports manual needle placement without moving the patient out of the magnet. (paper)

  6. System safety analysis of the Yucca Mountain tunnel boring machine

    International Nuclear Information System (INIS)

    Smith, M.G.; Booth, L.; Eisler, L.

    1995-01-01

    The purpose of this analysis was to systematically identify and evaluate hazards related to the tunnel boring machine to be used at Yucca Mountain. This analysis required three steps to complete the risk evaluation: hazard/scenario identification, consequence assessment, and frequency assessment. The result was a 'risk evaluation' of the scenarios identified in this analysis in accordance with MIL-STD-882C. The risk assessment in this analysis characterized the accident scenarios associated with the TBM in terms of relative risk and included recommendations for mitigating all identified risks

  7. Simulation of Single Reed Instruments Oscillations Based on Modal Decomposition of Bore and Reed Dynamics

    OpenAIRE

    Silva, Fabrice; Debut, Vincent; Kergomard, Jean; Vergez, Christophe; Deblevid, Aude; Guillemain, Philippe

    2007-01-01

    This paper investigates the sound production in a system made of a bore coupled with a reed valve. Extending previous work (Debut, 2004), the input impedance of the bore is projected on the modes of the air column. The acoustic pressure is therefore calculated as the sum of modal components. The airrrflow blown into the bore is modulated by reed motion, assuming the reed to be a single degree of freedom oscillator. Calculation of self-sustained oscillations controlled by time-varyi...

  8. Technical manual: operation and equipment instructions for in situ impulse test

    International Nuclear Information System (INIS)

    1979-11-01

    This manual describes the test equipment and procedures for a new field test which determines the shear modulus of a soil deposit at strain levels equivalent to those experienced during actual earthquakes. Results from this test are typically used as input parameters to response analyses for evaluating local soil effects during earthquake shaking. The test employs a cross-hole wave propagation procedure with velocity transducers located in closely spaced adjacent borings. Clear, consistent, and repeatable data in all types of soil and a method of data reduction different from conventional geophysical first arrival techniques are unique aspects of this new test. In addition to describing the principles of the test and data reduction procedures, major discussions of the field procedures are also included. Detailed drilling and testing information is provided both for planning and executing a test program

  9. Seismic response and damping tests of small bore LMFBR piping and supports

    International Nuclear Information System (INIS)

    Barta, D.A.; Anderson, M.J.; Severud, L.K.; Lindquist, M.R.

    1984-01-01

    Seismic testing and analysis of a prototypical Liquid Metal Fast Breeder Reactor (LMFBR) small bore piping system is described. Measured responses to simulated seismic excitations are compared with analytical predictions based on NRC Regulatory Guide 1.61 and measured system damping values. The test specimen was representative of a typical LMFBR insulated small bore piping system, and it was supported from a rigid test frame by prototypic dead weight supports, mechanical snubbers and pipe clamps

  10. Enhanced Automated Guidance System for Horizontal Auger Boring Based on Image Processing.

    Science.gov (United States)

    Wu, Lingling; Wen, Guojun; Wang, Yudan; Huang, Lei; Zhou, Jiang

    2018-02-15

    Horizontal auger boring (HAB) is a widely used trenchless technology for the high-accuracy installation of gravity or pressure pipelines on line and grade. Differing from other pipeline installations, HAB requires a more precise and automated guidance system for use in a practical project. This paper proposes an economic and enhanced automated optical guidance system, based on optimization research of light-emitting diode (LED) light target and five automated image processing bore-path deviation algorithms. An LED light target was optimized for many qualities, including light color, filter plate color, luminous intensity, and LED layout. The image preprocessing algorithm, direction location algorithm, angle measurement algorithm, deflection detection algorithm, and auto-focus algorithm, compiled in MATLAB, are used to automate image processing for deflection computing and judging. After multiple indoor experiments, this guidance system is applied in a project of hot water pipeline installation, with accuracy controlled within 2 mm in 48-m distance, providing accurate line and grade controls and verifying the feasibility and reliability of the guidance system.

  11. Looking ahead of a tunnel boring machine with 2-D SH full waveform inversion

    NARCIS (Netherlands)

    Pisupati, P.B.; Mulder, W.A.; Drijkoningen, G.G.; Reijnen, R.

    2015-01-01

    In the near-surface with unconsolidated soils, shear properties can be well imaged, sometimes better than P-wave properties. To facilitate ground prediction ahead of a tunnel boring machine (TBM), active ‘surveys’ with shear-wave vibrators are carried out during boring. In such surveys, only a few

  12. Boring sponges (Porifera, Clionidae) collected during the "Tydeman" Canary Islands expedition Cancap-II, 1977

    NARCIS (Netherlands)

    Groot, de R.A.

    1980-01-01

    INTRODUCTION AND MATERIAL The boring sponges of the Canary Islands have never been studied in any detail, but the boring fauna of this archipelago cannot be expected to be very rich. All islands are volcanic and calcareous rocks are not common. Consequently, in most areas large shells and rhodophyte

  13. Bore erosion due to plasma armatures in EM launchers

    International Nuclear Information System (INIS)

    Askew, R.F.; Brown, J.L.; Jensen, D.B.

    1987-01-01

    Bore erosion, both to insulators and rails, has been a major concern in the EM Launcher community. Plasma armatures have generally produced both melting and ablation from the rails, with the result that the surface texture of the rails is course and uneven upon resolidification. Ablation evidence for insulators varies with material but mass lose by decomposition appears prevalent. Theoretical models for EML performance, both one and two dimensional, have a strong dependence on armature mass, which is turn is influenced by rail and insulator ablation. Ablation models are strongly dependent on the armature plasma temperature. In order to test the accuracy of models detailed information is needed on the time dependence of the in-bore plasma parameters such as pressure, temperature, and electron density. Previously reported experimental data indicated that mechanisms other than plasma radiation are involved in the ablation process. New experiments have been conducted using a small, square bore (1 cm) facility, 60 cm in length, to quantify the erosions and to relate this to conditions within the armature and possible plasma chemistry processes at the rails and insulators. Mass loss has been measured as a function of position on both the rails and insulators. These have been correlated with the time history of the gas dynamic pressure at that location. In addition, the armature current time history has been correlated with the pressure

  14. Straddle packer system design and operation for vertical characterization of open bore holes

    International Nuclear Information System (INIS)

    Olsen, J.K.

    1994-01-01

    Bore holes open to large intervals provide groundwater samples and test results which represent an unknown integration of properties throughout the depth of the hole. The State of Idaho's INEL Oversight Program is utilizing a custom straddle-packer system to develop a vertical characterization of water chemistry and hydrology in selected open bore holes at the Idaho National Engineering Laboratory. This report describes the design and operation for bore hole zone isolation, water sampling, and hydrologic testing. To reduce potential influences on in situ water chemistry, the system utilizes chemically inert components to the extent possible. Straddle packer systems are effective in producing representative water samples from isolated formations. Hydrologic testing is limited by the ability to produce a measurable stress on the aquifer in individual formations, and head measurement sensitivity. 4 figs

  15. Incident wave, infragravity wave, and non-linear low-frequency bore evolution across fringing coral reefs

    Science.gov (United States)

    Storlazzi, C. D.; Griffioen, D.; Cheriton, O. M.

    2016-12-01

    Coral reefs have been shown to significantly attenuate incident wave energy and thus provide protection for 100s of millions of people globally. To better constrain wave dynamics and wave-driven water levels over fringing coral reefs, a 4-month deployment of wave and tide gauges was conducted across two shore-normal transects on Roi-Namur Island and two transects on Kwajalein Island in the Republic of the Marshall Islands. At all locations, although incident wave (periods 250 s) heights on the outer reef flat just inshore of the zone of wave breaking, the infragravity wave heights generally equaled the incident wave heights by the middle of the reef flat and exceeded the incident wave heights on the inner reef flat by the shoreline. The infragravity waves generally were asymmetric, positively skewed, bore-like forms with incident-band waves riding the infragravity wave crest at the head of the bore; these wave packets have similar structure to high-frequency internal waves on an internal wave bore. Bore height was shown to scale with water depth, offshore wave height, and offshore wave period. For a given tidal elevation, with increasing offshore wave heights, such bores occurred more frequently on the middle reef flat, whereas they occurred less frequently on the inner reef flat. Skewed, asymmetric waves are known to drive large gradients in velocity and shear stress that can transport material onshore. Thus, a better understanding of these low-frequency, energetic bores on reef flats is critical to forecasting how coral reef-lined coasts may respond to sea-level rise and climate change.

  16. Analytical and Numerical Modeling of Tsunami Wave Propagation for double layer state in Bore

    Science.gov (United States)

    Yuvaraj, V.; Rajasekaran, S.; Nagarajan, D.

    2018-04-01

    Tsunami wave enters into the river bore in the landslide. Tsunami wave propagation are described in two-layer states. The velocity and amplitude of the tsunami wave propagation are calculated using the double layer. The numerical and analytical solutions are given for the nonlinear equation of motion of the wave propagation in a bore.

  17. A foam formulation of an entomopathogenic fungus for control of boring beetles in avocado orchards

    Science.gov (United States)

    A foam formulation of Beauveria bassiana was adapted to control boring beetles in avocado orchards. The two geographically independent avocado growing areas in the United States are threatened by emerging diseases vectored by boring beetles. In the California growing region, Fusarium dieback is vect...

  18. Solid-to-hybrid transitioning armature railgun with non-conforming-to-prejudice bore profile

    Science.gov (United States)

    Solberg, Jerome Michael

    2012-12-04

    An improved railgun, railgun barrel, railgun projectile, and railgun system for accelerating a solid-to-hybrid transitioning armature projectile using a barrel having a bore that does not conform to a cross-sectional profile of the projectile, to contact and guide the projectile only by the rails in a low pressure bore volume so as to minimize damage, failure, and/or underperformance caused by plasma armatures, insulator ablation, and/or restrikes.

  19. Ethylene glycol as bore fluid for hollow fiber membrane preparation

    KAUST Repository

    Le, Ngoc Lieu

    2017-03-31

    We proposed the use of ethylene glycol and its mixture with water as bore fluid for the preparation of poly(ether imide) (PEI) hollow fiber membranes and compared their performance and morphology with membranes obtained with conventional coagulants (water and its mixture with the solvent N-methylpyrrolidone (NMP)). Thermodynamics and kinetics of the systems were investigated. Water and 1:1 water:EG mixtures lead to fast precipitation rates. Slow precipitation is observed for both pure EG and 9:1 NMP:water mixture, but the reasons for that are different. While low osmotic driving force leads to slow NMP and water transport when NMP:water is used, the high EG viscosity is the reason for the slow phase separation when EG is the bore fluid. The NMP:water mixture produces fibers with mixed sponge-like and finger-like structure with large pores in the inner and outer layers; and hence leading to a high water permeance and a high MWCO suitable for separation of large-sized proteins. As compared to NMP:water, using EG as bore fluid provides fibers with a finger-like bilayered structure and sponge-like layers near the surfaces, and hence contributing to the higher water permeance. It also induces small pores for better protein rejection.

  20. Ethylene glycol as bore fluid for hollow fiber membrane preparation

    KAUST Repository

    Le, Ngoc Lieu; Nunes, Suzana Pereira

    2017-01-01

    We proposed the use of ethylene glycol and its mixture with water as bore fluid for the preparation of poly(ether imide) (PEI) hollow fiber membranes and compared their performance and morphology with membranes obtained with conventional coagulants (water and its mixture with the solvent N-methylpyrrolidone (NMP)). Thermodynamics and kinetics of the systems were investigated. Water and 1:1 water:EG mixtures lead to fast precipitation rates. Slow precipitation is observed for both pure EG and 9:1 NMP:water mixture, but the reasons for that are different. While low osmotic driving force leads to slow NMP and water transport when NMP:water is used, the high EG viscosity is the reason for the slow phase separation when EG is the bore fluid. The NMP:water mixture produces fibers with mixed sponge-like and finger-like structure with large pores in the inner and outer layers; and hence leading to a high water permeance and a high MWCO suitable for separation of large-sized proteins. As compared to NMP:water, using EG as bore fluid provides fibers with a finger-like bilayered structure and sponge-like layers near the surfaces, and hence contributing to the higher water permeance. It also induces small pores for better protein rejection.

  1. Acoustic Monitoring for Tunnel Boring in Soft Soils

    NARCIS (Netherlands)

    Swinnen, G.

    2003-01-01

    The TBM, not a blind mole! This thesis deals with some aspects of seismic imaging of the soft soil in front of a Tunnel Boring Machine to help tunnel constructors ``see'' the subsurface they are approaching, instead of steering the TBM forward like a ``blind mole''. The Dutch shallow subsurface has

  2. Tunnel Boring Machine for nuclear waste repository research project

    International Nuclear Information System (INIS)

    Janzon, H.A.

    1994-01-01

    A description is presented of a Tunnel Boring Machine and its intended use on a research project underway in Sweden for demonstrating and testing methods for rock investigation at a suitable depth for a deep repository for nuclear waste

  3. The evolution of an internal bore at the Malin shelf break

    Directory of Open Access Journals (Sweden)

    J. Small

    1999-04-01

    Full Text Available Observations of internal waves were made at the Malin shelf edge during SESAME (Shelf Edge Studies Acoustic Measurement Experiment, a part of the NERC LOIS-SES experiment, in August-September 1996. These measurements provide a high resolution dataset demonstrating internal wave generation and propagation. This note presents observations of the evolution of an internal bore. The process is shown clearly in a sequence of thermistor chain tows across the shelf break covering a complete tidal cycle, as the double-sided bore transforms into a group of undulations and eventually into more distinct solitary waveforms. Current structures associated with the bore and waves were also observed by ship-mounted ADCP. Analysis of the waveforms in terms of the linear modes and empirical orthogonal functions (EOFs indicate the dominance of the first mode, which is typical of a shallow water seasonal thermocline environment. Determination of the phase speed of the waves from the consecutive ship surveys enabled the Doppler shift in the towed data to be removed, allowing analysis of the real length scales of the waves. The bore evolution has been modelled using a first order non-linear KdV model for the first mode, initialised with the waveform in the first survey. Comparison of the model and the observations show close agreement in the amplitudes, length scales, phase speeds and separations of the leading internal waves as they evolve. Finally, analysis of the observed internal wave shapes indicates that, within the uncertainties of measurement, the wave-lengths lie between those predicted by first and second order soliton theory.Key words. Oceanography: general (continental shelf processes; ocean prediction. Oceanography: physical (internal and inertial waves

  4. The evolution of an internal bore at the Malin shelf break

    Directory of Open Access Journals (Sweden)

    J. Small

    Full Text Available Observations of internal waves were made at the Malin shelf edge during SESAME (Shelf Edge Studies Acoustic Measurement Experiment, a part of the NERC LOIS-SES experiment, in August-September 1996. These measurements provide a high resolution dataset demonstrating internal wave generation and propagation. This note presents observations of the evolution of an internal bore. The process is shown clearly in a sequence of thermistor chain tows across the shelf break covering a complete tidal cycle, as the double-sided bore transforms into a group of undulations and eventually into more distinct solitary waveforms. Current structures associated with the bore and waves were also observed by ship-mounted ADCP. Analysis of the waveforms in terms of the linear modes and empirical orthogonal functions (EOFs indicate the dominance of the first mode, which is typical of a shallow water seasonal thermocline environment. Determination of the phase speed of the waves from the consecutive ship surveys enabled the Doppler shift in the towed data to be removed, allowing analysis of the real length scales of the waves. The bore evolution has been modelled using a first order non-linear KdV model for the first mode, initialised with the waveform in the first survey. Comparison of the model and the observations show close agreement in the amplitudes, length scales, phase speeds and separations of the leading internal waves as they evolve. Finally, analysis of the observed internal wave shapes indicates that, within the uncertainties of measurement, the wave-lengths lie between those predicted by first and second order soliton theory.

    Key words. Oceanography: general (continental shelf processes; ocean prediction. Oceanography: physical (internal and inertial waves

  5. Flow and turbulence structure in a hypertidal estuary with the world's biggest tidal bore

    Science.gov (United States)

    Tu, Junbiao; Fan, Daidu

    2017-04-01

    Turbulent and flow structure associated with breaking tidal bores are deliberately investigated on the basis of field measurements. High-resolution velocity and hydrographic data are collected in the middle Qiantang Estuary by a vertical array of acoustic Doppler velocimeters and optical backscatter sensors, collaborated with a bottom-mounted acoustic Doppler current profiler. Besides obvious variations in diurnal and spring-neap tidal cycles, the estuarine dynamics is featured by extreme asymmetry in flood and ebb tides. The flood tide is abnormally accelerated to generate tidal bores at the first 10 min or more, with breaking or undular configurations at the front. The occurrence of peak flow velocity, turbulent kinetic energy (TKE), and TKE dissipation rate (ɛ) is definitely associated with breaking bores, with their values several times to 2 orders of magnitude larger than the corresponding secondary peak values during the maximum ebb flows. Flow and turbulence dynamics are significantly affected by the tidal-bore Froude number. A sandwich ɛ structure is clear exhibited with the maximum value at the surface, secondary maximum near the bed, and the minimum at the intermediate. Dual TKE sources are indicated by an approximate local balance between shear production and dissipation near the bottom, and a top-down TKE dissipation using the modified Froude scaling in the vertical water column. The highly elevated dissipation by breaking bores is comparable to that by intense breaking waves in the surf zone, and the former potentially penetrates the entire water column to produce extreme sediment-resuspension events in combination with intense bottom shear stress.

  6. Articles which include chevron film cooling holes, and related processes

    Science.gov (United States)

    Bunker, Ronald Scott; Lacy, Benjamin Paul

    2014-12-09

    An article is described, including an inner surface which can be exposed to a first fluid; an inlet; and an outer surface spaced from the inner surface, which can be exposed to a hotter second fluid. The article further includes at least one row or other pattern of passage holes. Each passage hole includes an inlet bore extending through the substrate from the inlet at the inner surface to a passage hole-exit proximate to the outer surface, with the inlet bore terminating in a chevron outlet adjacent the hole-exit. The chevron outlet includes a pair of wing troughs having a common surface region between them. The common surface region includes a valley which is adjacent the hole-exit; and a plateau adjacent the valley. The article can be an airfoil. Related methods for preparing the passage holes are also described.

  7. The Bored Self in Knowledge Work

    DEFF Research Database (Denmark)

    Costas, Jana; Kärreman, Dan

    2016-01-01

    of the bored self as a combination of unfilled aspirations and the sense of stagnation, leading to an arrested identity. Our contribution is to expand extant conceptualizations of employee interactions with identity regulation, in particular relating to identity work and identification. The findings provide......This article draws attention to reported experiences of boredom in knowledge work. Drawing on extensive qualitative data gathered at two management consultancy firms, we analyze these experiences as a particular interaction with identity regulation and work experiences. We conceptualize the reports...

  8. Separation of amino acids and antibiotics by narrow-bore and normal-bore high-performance liquid chromatography with pre-column derivatization.

    Science.gov (United States)

    Fiedler, H P; Plaga, A

    1987-01-16

    The selectivity, efficiency and lifetime of normal- and narrow-bore columns for high-performance liquid chromatography were investigated for the separation and quantification of amino acids and the amino acid-like antibiotics phosphinothricin and phosphinothricylalanylalanine in biological samples. These compounds were determined by an automated pre-column derivatization with o-phthalaldehyde-2-mercaptoethanol reagent and UV detection at 338 nm.

  9. Plasma dynamics near critical density inferred from direct measurements of laser hole boring

    Science.gov (United States)

    Gong, Chao; Tochitsky, Sergei Ya.; Fiuza, Frederico; Pigeon, Jeremy J.; Joshi, Chan

    2016-06-01

    We have used multiframe picosecond optical interferometry to make direct measurements of the hole boring velocity, vHB, of the density cavity pushed forward by a train of C O2 laser pulses in a near critical density helium plasma. As the pulse train intensity rises, the increasing radiation pressure of each pulse pushes the density cavity forward and the plasma electrons are strongly heated. After the peak laser intensity, the plasma pressure exerted by the heated electrons strongly impedes the hole boring process and the vHB falls rapidly as the laser pulse intensity falls at the back of the laser pulse train. A heuristic theory is presented that allows the estimation of the plasma electron temperature from the measurements of the hole boring velocity. The measured values of vHB, and the estimated values of the heated electron temperature as a function of laser intensity are in reasonable agreement with those obtained from two-dimensional numerical simulations.

  10. THE EFFECT OF WELL-BORE REVERSE FLOW OF FLUID ON ...

    African Journals Online (AJOL)

    ES Obe

    1980-03-01

    Mar 1, 1980 ... ABSTRACT. Well-bore storage may dominate the bottom-hole pressure profile of ... Type- curve matching is however only accurate when the storage factor .... numerical integration technique ... existence of a measure of well-.

  11. In-Bore MR-Guided Biopsy Systems and Utility of PI-RADS.

    Science.gov (United States)

    Fütterer, Jurgen J; Moche, Michael; Busse, Harald; Yakar, Derya

    2016-06-01

    A diagnostic dilemma exists in cases wherein a patient with clinical suspicion for prostate cancer has a negative transrectal ultrasound-guided biopsy session. Although transrectal ultrasound-guided biopsy is the standard of care, a paradigm shift is being observed. In biopsy-naive patients and patients with at least 1 negative biopsy session, multiparametric magnetic resonance imaging (MRI) is being utilized for tumor detection and subsequent targeting. Several commercial devices are now available for targeted prostate biopsy ranging from transrectal ultrasound-MR fusion biopsy to in bore MR-guided biopsy. In this review, we will give an update on the current status of in-bore MRI-guided biopsy systems and discuss value of prostate imaging-reporting and data system (PIRADS).

  12. Tubular bending and pull-out forces in high-curvature well bores

    International Nuclear Information System (INIS)

    Dareing, D.W.; Ahlers, C.A.

    1991-01-01

    This paper is concerned with drag forces developed on tubulars in high-curvature well bores typically found in drainhole and horizontal drilling. The dog-leg severity of these types of boreholes are considerably higher than those typically found in conventional directional drilling. The objective of the study was to determine the significance of bending stiffness on drag forces in the pull-out mode. The method of analysis treats the tubular as a multi-spanned curved beam under tension and solves for radial displacements, slope, shear and bending moment over each span. Calculations show that bending stiffness is a minor factor provided there are no locally severe dog legs superimposed in the high-curvature well bore

  13. Late Permian wood-borings reveal an intricate network of ecological relationships.

    Science.gov (United States)

    Feng, Zhuo; Wang, Jun; Rößler, Ronny; Ślipiński, Adam; Labandeira, Conrad

    2017-09-15

    Beetles are the most diverse group of macroscopic organisms since the mid-Mesozoic. Much of beetle speciosity is attributable to myriad life habits, particularly diverse-feeding strategies involving interactions with plant substrates, such as wood. However, the life habits and early evolution of wood-boring beetles remain shrouded in mystery from a limited fossil record. Here we report new material from the upper Permian (Changhsingian Stage, ca. 254-252 million-years ago) of China documenting a microcosm of ecological associations involving a polyphagan wood-borer consuming cambial and wood tissues of the conifer Ningxiaites specialis. This earliest evidence for a component community of several trophically interacting taxa is frozen in time by exceptional preservation. The combination of an entry tunnel through bark, a cambium mother gallery, and up to 11 eggs placed in lateral niches-from which emerge multi-instar larval tunnels that consume cambium, wood and bark-is ecologically convergent with Early Cretaceous bark-beetle borings 120 million-years later.Numerous gaps remain in our knowledge of how groups of organisms interacted in ancient ecosystems. Here, Feng and colleagues describe a late Permian fossil wood-boring beetle microcosm, with the oldest known example of complex tunnel geometry, host tissue response, and the presence of fungi within.

  14. Tension Tests On Bored Piles In Sand

    DEFF Research Database (Denmark)

    Krabbenhøft, Sven; Clausen, Johan; Damkilde, Lars

    2006-01-01

    The lengths of the bored piles varied from 2 m to 6 m and all were of a diameter of 140 mm. The piles were tested to failure in tension and the load-displacement relations were recorded. The investigation has shown pronounced differences between the load bearing capacities obtained by different...... design methods. The methods proposed by Fleming et al. and Reese & O’Neill seem to produce the best match with the test results....

  15. Aspiration of breast abscess through wide bore 14-gauge intravenous cannula.

    Science.gov (United States)

    Afridi, Shahida Parveen; Alam, Shams Nadeem; Ainuddin, Saman

    2014-10-01

    To aspirate breast abscess through a wide bore (14-gauge) intravenous (I/V) cannula and determine its efficacy in terms of the number of recurrences and number of aspirations. Case series. Dow University of Health Sciences and Civil Hospital and Bantva Hospital, Karachi, Pakistan, from January 2009 to December 2011. Patients with breast abscesses confirmed on ultrasound without skin ulceration were selected. The soft area of breast abscess with positive fluctuation was marked and fixed with index finger and thumb. A 14-gauge cannula was inserted. Pus was aspirated through a 50 cc syringe, repeated till no aspirate could be obtained. All patients were followed weekly for 4 weeks, clinically for size of lump, local tenderness and temperature, while complete resolution was confirmed on ultrasound, as resolution of the lesion. A total of 55 patients were included in this study. Mean age was 29 ± 5.58 years while ranging from 20 - 40 years. Complete resolution of abscess was seen in 31 (56.4%) cases by single aspiration. Second aspiration was required in 24 (43.6%) patients and third aspiration in single setting was required in one case only. Recurrence after the second aspiration occurred in 08 (14.5%). Incision drainage was required in 7 (12.7%) patients. Percutaneous aspiration of breast abscess through a wide bore (14-gauge) I/V cannula is a simple alternative to incision and drainage.

  16. Downhole instrument including a flexible probe which can travel freely around bends in a borehole

    International Nuclear Information System (INIS)

    Dickinson III, B. W. O.

    1985-01-01

    Bore hole instrument and methods of manufacturing and using the same. The instrument includes an elongated flexible probe which is inserted into a bore hole and can travel freely around bends of relatively short radius in the hole. The probe includes a plurality of sensors, explosive charges or the like which are spaced apart and embedded in a flexible body comprising a mass of cushioning material, with a flexible outer casing of fabric having a high tensile strength. The probe is driven into a bore hole in piston-like fashion, and the flexible body enables the probe to travel freely around bends of relatively short radius. Instrumentation for processing signals from the probe is located at the surface of the earth, and a flexible cable interconnects the instrumentation with the probe

  17. Navigated MRI-guided liver biopsies in a closed-bore scanner: experience in 52 patients.

    Science.gov (United States)

    Moche, Michael; Heinig, Susann; Garnov, Nikita; Fuchs, Jochen; Petersen, Tim-Ole; Seider, Daniel; Brandmaier, Philipp; Kahn, Thomas; Busse, Harald

    2016-08-01

    To evaluate clinical effectiveness and diagnostic efficiency of a navigation device for MR-guided biopsies of focal liver lesions in a closed-bore scanner. In 52 patients, 55 biopsies were performed. An add-on MR navigation system with optical instrument tracking was used for image guidance and biopsy device insertion outside the bore. Fast control imaging allowed visualization of the true needle position at any time. The biopsy workflow and procedure duration were recorded. Histological analysis and clinical course/outcome were used to calculate sensitivity, specificity and diagnostic accuracy. Fifty-four of 55 liver biopsies were performed successfully with the system. No major and four minor complications occurred. Mean tumour size was 23 ± 14 mm and the skin-to-target length ranged from 22 to 177 mm. In 39 cases, access path was double oblique. Sensitivity, specificity and diagnostic accuracy were 88 %, 100 % and 92 %, respectively. The mean procedure time was 51 ± 12 min, whereas the puncture itself lasted 16 ± 6 min. On average, four control scans were taken. Using this navigation device, biopsies of poorly visible and difficult accessible liver lesions could be performed safely and reliably in a closed-bore MRI scanner. The system can be easily implemented in clinical routine workflow. • Targeted liver biopsies could be reliably performed in a closed-bore MRI. • The navigation system allows for image guidance outside of the scanner bore. • Assisted MRI-guided biopsies are helpful for focal lesions with a difficult access. • Successful integration of the method in clinical workflow was shown. • Subsequent system installation in an existing MRI environment is feasible.

  18. Intense Undular Bores on the Autumn Pycnocline of Shelf Waters of the Peter the Great Bay (Sea of Japan)

    Science.gov (United States)

    Dolgikh, G. I.; Novotryasov, V. V.; Yaroshchuk, I. O.; Permyakov, M. S.

    2018-03-01

    The results of field observations of an internal undular bore that were performed in a coastal zone of constant depth in the Sea of Japan are presented. A hydrodynamic model of undular bores is discussed according to which the recorded disturbances of the water medium are an experimental prototype of strongly nonlinear (intense) internal undular bores on the pycnocline of shelf waters of Peter the Great Bay with an intensity close to the limit.

  19. Tri-bore PVDF hollow fibers with a super-hydrophobic coating for membrane distillation

    KAUST Repository

    Lu, Kang-Jia; Zuo, Jian; Chung, Tai-Shung

    2016-01-01

    Membranes with good mechanical strength, high vapor flux and outstanding anti-wetting properties are essential for membrane distillation (MD) applications. In this work, porous polyvinylidene fluoride (PVDF) tri-bore hollow fiber membranes with super-hydrophobicity are developed to achieve these desired properties. The tri-bore hollow fiber offers better mechanical strength than the conventional single-bore fiber. To improve its anti-wetting properties, Teflon® AF 2400 is coated on the membrane surface. The effects of coating on membrane morphology, performance and anti-wetting properties have been thoroughly investigated. With an optimal coating condition (0.025 wt% of Teflon® AF 2400, 30 s), a super-hydrophobic surface with a contact angle of 151o is achieved. The resultant membrane shows an increase of 109% in liquid entry pressure (LEP) with a slight sacrifice of 21% in flux. Long term direct contact MD tests have confirmed that the Teflon® AF 2400 coated membrane has enhanced stability with an average flux of 21 kg m-2 h-1 and rejection of 99.99% at 60 °° C for desalination application.

  20. Tri-bore PVDF hollow fibers with a super-hydrophobic coating for membrane distillation

    KAUST Repository

    Lu, Kang-Jia

    2016-04-26

    Membranes with good mechanical strength, high vapor flux and outstanding anti-wetting properties are essential for membrane distillation (MD) applications. In this work, porous polyvinylidene fluoride (PVDF) tri-bore hollow fiber membranes with super-hydrophobicity are developed to achieve these desired properties. The tri-bore hollow fiber offers better mechanical strength than the conventional single-bore fiber. To improve its anti-wetting properties, Teflon® AF 2400 is coated on the membrane surface. The effects of coating on membrane morphology, performance and anti-wetting properties have been thoroughly investigated. With an optimal coating condition (0.025 wt% of Teflon® AF 2400, 30 s), a super-hydrophobic surface with a contact angle of 151o is achieved. The resultant membrane shows an increase of 109% in liquid entry pressure (LEP) with a slight sacrifice of 21% in flux. Long term direct contact MD tests have confirmed that the Teflon® AF 2400 coated membrane has enhanced stability with an average flux of 21 kg m-2 h-1 and rejection of 99.99% at 60 °° C for desalination application.

  1. Intraoperative and postoperative feasibility and safety of total tubeless, tubeless, small-bore tube, and standard percutaneous nephrolithotomy: a systematic review and network meta-analysis of 16 randomized controlled trials.

    Science.gov (United States)

    Lee, Joo Yong; Jeh, Seong Uk; Kim, Man Deuk; Kang, Dong Hyuk; Kwon, Jong Kyou; Ham, Won Sik; Choi, Young Deuk; Cho, Kang Su

    2017-06-27

    Percutaneous nephrolithotomy (PCNL) is performed to treat relatively large renal stones. Recent publications indicate that tubeless and total tubeless (stentless) PCNL is safe in selected patients. We performed a systematic review and network meta-analysis to evaluate the feasibility and safety of different PCNL procedures, including total tubeless, tubeless with stent, small-bore tube, and large-bore tube PCNLs. PubMed, Cochrane Central Register of Controlled Trials, and EMBASE™ databases were searched to identify randomized controlled trials published before December 30, 2013. One researcher examined all titles and abstracts found by the searches. Two investigators independently evaluated the full-text articles to determine whether those met the inclusion criteria. Qualities of included studies were rated with Cochrane's risk-of-bias assessment tool. Sixteen studies were included in the final syntheses including pairwise and network meta-analyses. Operation time, pain scores, and transfusion rates were not significantly different between PCNL procedures. Network meta-analyses demonstrated that for hemoglobin changes, total tubeless PCNL may be superior to standard PCNL (mean difference [MD] 0.65, 95% CI 0.14-1.13) and tubeless PCNLs with stent (MD -1.14, 95% CI -1.65--0.62), and small-bore PCNL may be superior to tubeless PCNL with stent (MD 1.30, 95% CI 0.27-2.26). Network meta-analyses also showed that for length of hospital stay, total tubeless (MD 1.33, 95% CI 0.23-2.43) and tubeless PCNLs with stent (MD 0.99, 95% CI 0.19-1.79) may be superior to standard PCNL. In rank probability tests, small-bore tube and total tubeless PCNLs were superior for operation time, pain scores, and hemoglobin changes. For hemoglobin changes, total tubeless and small-bore PCNLs may be superior to other methods. For hospital stay, total tubeless and tubeless PCNLs with stent may be superior to other procedures.

  2. Compact and air-transportable ultrasonic turbine disc bore inspection system

    International Nuclear Information System (INIS)

    Larsen, R.E.; Leon-Salamanca, T.

    1990-01-01

    A compact, lightweight, air-transportable ultrasonic inspection system for bore and keyway regions of shrunk-on turbine discs has been developed. The system utilizes a proprietary ultrasound liquid coupling technique in conjunction with a single pair of gimballed search units to achieve rapid and thorough coverage of bores and keyways in both heavy nuclear and standard fossil discs of nearly any size and having any conceivable web surface contour. Search unit positioning and angulation parameter settings are established in near real-time through a computation algorithm based on a compact vector ray tracing protocol. Modular construction and the use of lightweight, stiff materials throughout facilitates air shipment of the system and its rapid deployment at continental and overseas field sites. Mechanical and ultrasonic features of the system are described. Development and application of the computation algorithm to the ultrasonic inspection of heavy discs at an overseas power station is discussed

  3. Seismic monitoring experiment of raise boring in 2014

    International Nuclear Information System (INIS)

    Saari, J.; Malm, M.

    2015-01-01

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of ONKALO. The possibility to excavate an illegal access to ONKALO has been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal undetected excavation by blasting within the Olkiluoto seismic network area. In this report a possibility of seismic monitoring of undeclared excavation done by tunnel boring machine (TBM) has been investigated. In the earlier investigations the instruments were at the ground surface and the sensors were triaxial short period (1 Hz) geophones or broadband geophones. The characteristics (frequency content, polarity and amplitude) of the continuous seismic vibration generated by TMB were studied. The onset time of the seismic signal were not distinguished. Altogether 16 new 10 kHz accelerometers were installed in boreholes inside ONKALO March 2012. The sensors comprised a new subnetwork that monitored the raise boring of two shafts done 2014, from the level -455 m to the level -290 m. The aim was to record the seismic signal generated when the drill bit hits the rock at the moment the tunnel boring begins. Altogether 113 seismic signals generated by the drill bit were located during the

  4. Seismic monitoring experiment of raise boring in 2014

    Energy Technology Data Exchange (ETDEWEB)

    Saari, J.; Malm, M. [AaF-Consult Oy, Espoo (Finland)

    2015-01-15

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of ONKALO. The possibility to excavate an illegal access to ONKALO has been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal undetected excavation by blasting within the Olkiluoto seismic network area. In this report a possibility of seismic monitoring of undeclared excavation done by tunnel boring machine (TBM) has been investigated. In the earlier investigations the instruments were at the ground surface and the sensors were triaxial short period (1 Hz) geophones or broadband geophones. The characteristics (frequency content, polarity and amplitude) of the continuous seismic vibration generated by TMB were studied. The onset time of the seismic signal were not distinguished. Altogether 16 new 10 kHz accelerometers were installed in boreholes inside ONKALO March 2012. The sensors comprised a new subnetwork that monitored the raise boring of two shafts done 2014, from the level -455 m to the level -290 m. The aim was to record the seismic signal generated when the drill bit hits the rock at the moment the tunnel boring begins. Altogether 113 seismic signals generated by the drill bit were located during the

  5. The Model of the Software Running on a Computer Equipment Hardware Included in the Grid network

    Directory of Open Access Journals (Sweden)

    T. A. Mityushkina

    2012-12-01

    Full Text Available A new approach to building a cloud computing environment using Grid networks is proposed in this paper. The authors describe the functional capabilities, algorithm, model of software running on a computer equipment hardware included in the Grid network, that will allow to implement cloud computing environment using Grid technologies.

  6. Preparations for a major overhaul with equipment for semiautomtic operation on pipework in regions of high radiation dose in nuclear power stations

    International Nuclear Information System (INIS)

    Hoch, G.

    1979-01-01

    This paper presents equipment which can be used in the field of high radiation dose on pipeline. This comprises either semi or fully automatic operating machines for the segregation of pipeline, for the treatment of pipeline terminations (weld edges attachments, internal bores), for plating and welding, and also for the testing (ultrasonic and eddy-current testing) of pipelines. (orig./HP) [de

  7. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  8. A finite element thermohydrodynamic analyis of profile bore bearing

    International Nuclear Information System (INIS)

    Shah Nor bin Basri

    1994-01-01

    A finite element-based method is presented for analysing the thermohydrodynamic (THD) behaviour of profile bore bearing. A variational statement for the governing equation is derived and used to formulate a non-linear quadrilateral finite element of serendipity family. The predicted behaviour is compared with experimental evidence where possible and favorable correlation is obtained

  9. Estimation of the equilibrium formation temperature in the presence of bore fluid invasion

    DEFF Research Database (Denmark)

    Poulsen, Søren Erbs; Nielsen, S.B.; Balling, N.

    2012-01-01

    from BHT measurements in the presence of bore fluid invasion. The scheme is based on finite element analysis in conjunction with Markov chain Monte Carlo inversion. The axisymmetric forward model assumes a cylindrical source of finite radius and contrasting thermal parameters, which includes...... by correction schemes based on purely conductive models. The influence of the borehole radius and fluid invasion on the temperature measured at the borehole axis attenuates over time. It is further demonstrated that the invasion radius and the matrix thermal conductivity cannot be estimated simultaneously...

  10. Aspiration of Breast Abscess through Wide Bore 14-Gauge Intravenous Cannula

    International Nuclear Information System (INIS)

    Afridi, S. P.; Alam, S. N.; Ainuddin, S.

    2014-01-01

    Objective: To aspirate breast abscess through a wide bore (14-gauge) intravenous (I/V) cannula and determine its efficacy in terms of the number of recurrences and number of aspirations. Study Design: Case series. Place and Duration of Study: Dow University of Health Sciences and Civil Hospital and Bantva Hospital, Karachi, Pakistan, from January 2009 to December 2011. Methodology: Patients with breast abscesses confirmed on ultrasound without skin ulceration were selected. The soft area of breast abscess with positive fluctuation was marked and fixed with index finger and thumb. A 14-gauge cannula was inserted. Pus was aspirated through a 50 cc syringe, repeated till no aspirate could be obtained. All patients were followed weekly for 4 weeks, clinically for size of lump, local tenderness and temperature, while complete resolution was confirmed on ultrasound, as resolution of the lesion. Results: A total of 55 patients were included in this study. Mean age was 29 +- 5.58 years while ranging from 20 - 40 years. Complete resolution of abscess was seen in 31 (56.4%) cases by single aspiration. Second aspiration was required in 24 (43.6%) patients and third aspiration in single setting was required in one case only. Recurrence after the second aspiration occurred in 08 (14.5%). Incision drainage was required in 7 (12.7%) patients. Conclusion: Percutaneous aspiration of breast abscess through a wide bore (14-gauge) I/V cannula is a simple alternative to incision and drainage. (author)

  11. Exploring the role of wood waste landfills in early detection of non-native alien wood-boring beetles

    Science.gov (United States)

    Davide Rassati; Massimo Faccoli; Lorenzo Marini; Robert A. Haack; Andrea Battisti; Edoardo. Petrucco Toffolo

    2015-01-01

    Non-native wood-boring beetles (Coleoptera) represent one of the most commonly intercepted groups of insects at ports worldwide. The development of early detection methods is a crucial step when implementing rapid response programs so that non-native wood-boring beetles can be quickly detected and a timely action plan can be produced. However, due to the limited...

  12. Deposition of high-level radioactive waste products in bore-holes with buffer substance

    International Nuclear Information System (INIS)

    Jacobsson, A.; Pusch, R.

    1977-05-01

    The present investigation comprised a compilation of available literature data concerning the possible use of clayey masses as buffer substances in bore-holes (in rock) with canisters containing radioactive waste products. The aim was to find a suitable composition of the buffer mass and to recommend a suitable storing technique. The criteria concerning the function of the buffer substance were: Sufficient mechanical supporting power, suitable mechanical properties, prevention of free circulation of ground water, ion-adsorption ability, sufficiently good heat conduction properties. These criteria suggest that a buffer substance containing Na-montmorillonite would be suitable. Literature studies and own experience show that montmorillonite is permanently stable at 100 degrees C temperature and 5 MPa pressure when pH is within the range of 6.5-10 while quartz is stable at pH <9. The authors conclude that the suggested principle of storing the canisters in sealed bore-holes filled with a 10 percent bentonite/90 percent quartz (silt, sand) mass is suitable provided that the tunnel system, from which the holes are bored, is sealed with a dense buffer mass consisting of quartz (silt, sand) and 20-50 percent bentonite powder. (author)

  13. External Microflora of a Marine Wood-Boring Isopod

    OpenAIRE

    Boyle, Paul J.; Mitchell, Ralph

    1981-01-01

    Bacteria associated with the marine wood-boring isopod Limnoria lignorum were enumerated by acridine orange epifluorescence microscopy and by plate counts on several media; the plate-viable bacteria were isolated and identified. Similar procedures were followed to enumerate and identify bacteria associated with the wood substrate from which the isopods were collected and with the surrounding water from the isopod habitat. Approximately 1.4 × 107 bacterial cells were associated with each indiv...

  14. Recent development in the design of hard rock tunnel boring machines for the mining industry

    International Nuclear Information System (INIS)

    Snyder, L.L.; Williams, R.I.

    1991-01-01

    Underground development for nuclear waste storage will possibly require tunnels to be excavated in a variety of rock conditions and configurations. Recent innovations in Tunnel Boring Machine (TBM) design have allowed for an evolved style of TBM which has distinct advantages over the standard machines. Present day conventional hard rock TBM's were developed primarily for the long, relatively straight tunnels of the civil construction industry, thereby making them for the most part, unsuitable for the sharp curves, turnouts, declines, inclines and ramps required in many underground environments. The five foot to 36 foot (1.52 to 11 m) diameter machines are capable of boring tunnels with curve radiuses as small as 40 to 90 feet (12.2 to 27.5 m) depending on size. These short turning radiuses can be accomplished while gripping the tunnel walls horizontally in the traditional manner or vertically as required when intersecting existing tunnels, or making turnouts from the tunnel that the machine has just bored. The machine's length is approximately half of a traditional machine's length while still employing a full measure of thrust, horsepower and rock cutting ability. The machine's short length, combined with a patented machine structure allows it to steer while boring without causing harmful eccentric loads on the cutterhead and main bearing assembly. The machine configuration is versatile and can be easily modified to operate in a wide variety of conditions

  15. Small-bore chest tubes seem to perform better than larger tubes in treatment of spontaneous pneumothorax

    DEFF Research Database (Denmark)

    Iepsen, Ulrik Winning; Ringbæk, Thomas

    2013-01-01

    The aim of this study was to compare the efficacy and complications of surgical (large-bore) chest tube drainage with smaller and less invasive chest tubes in the treatment of non-traumatic pneumothorax (PT). ......The aim of this study was to compare the efficacy and complications of surgical (large-bore) chest tube drainage with smaller and less invasive chest tubes in the treatment of non-traumatic pneumothorax (PT). ...

  16. Four-layer, two-inch bore, superconducting dipole magnet

    International Nuclear Information System (INIS)

    Hassenzahl, W.V.; Peters, C.; Gilbert, W.; Taylor, C.; Meuser, R.

    1982-11-01

    Superconductors provide the accelerator designer with a unique opportunity to construct machines that can achieve high particle energies and yet have low operating costs. This paper describes the design, fabrication and testing of a 4 layer, 50 mm bore superconducting dipole magnet, D-9A. The magnet reached short sample, 5.8 T at 4.4 K and 8.0 T and 1.8 K, with little training, and exhibited low losses and low ramp rate sensitivity

  17. Study on tsunami damage mechanism in Fukushima Prefecture focusing on the generation of bores

    International Nuclear Information System (INIS)

    Okuma, Shohei; Sato, Shinji; Yamanaka, Yusuke; Sanuki, Hiroshi

    2015-01-01

    Destruction mechanisms of coastal structures due to the 2011 Tohoku Tsunami were investigated on the basis of field surveys in Fukushima Prefecture. Severe destruction appeared to be developed by the action of breaking bores. Laboratory experiments demonstrated that the angle of the tsunami front was an essential parameter for the generation of breaking bores. Larger wave force was observed as the angle of the tsunami front became steeper. Numerical simulation revealed that such a steep tsunami was developed in the central part of Fukushima Prefecture, where the reflection of the preceding tsunami by coastal cliff enhanced the steepness of the largest tsunami. (author)

  18. Pressure bump instability in very large cold bore storage rings

    International Nuclear Information System (INIS)

    Limon, P.

    1983-12-01

    Calculations have been done to estimate the circulating current necessary to induce the onset of a pressure bump instability in a cold bore storage ring. For a wide range of storage ring parameters, the instability threshold current is more than an order of magnitude higher than the operating current. 4 references, 2 tables

  19. Space-borne observation of mesospheric bore by Visible and near Infrared Spectral Imager onboard the International Space Station

    Science.gov (United States)

    Hozumi, Y.; Saito, A.; Sakanoi, T.; Yamazaki, A.; Hosokawa, K.

    2017-12-01

    Mesospheric bores were observed by Visible and near Infrared Spectral Imager (VISI) of the ISS-IMAP mission (Ionosphere, Mesosphere, upper Atmosphere and Plasmasphere mapping mission from the International Space Station) in O2 airglow at 762 nm wavelength. The mesospheric bore is moving front of sharp jump followed by undulations or turbulence in the mesopause region. Since previous studies of mesospheric bore were mainly based on ground-based airglow imaging that is limited in field-of-view and observing site, little is known about its horizontal extent and global behavior. Space-borne imaging by ISS-IMAP/VISI provides an opportunity to study the mesospheric bore with a wide field-of-view and global coverage. A mesospheric bore was captured by VISI in two consecutive paths on 9 July 2015 over the south of African continent (48ºS - 54ºS and 15ºE). The wave front aligned with south-north direction and propagated to west. The phase velocity and wave length of the following undulation were estimated to 100 m/s and 30 km, respectively. Those parameters are similar to those reported by previous studies. 30º anti-clockwise rotation of the wave front was recognized in 100 min. Another mesospheric bore was captured on 9 May 2013 over the south Atlantic ocean (35ºS - 43ºS and 24ºW - 1ºE) with more than 2,200 km horizontal extent of wave front. The wave front aligned with southeast-northwest direction. Because the following undulation is recognized in the southwest side of the wave front, it is estimated to propagate to northeast direction. The wave front was modulated with 1,000 km wave length. This modulation implies inhomogeneity of the phase velocity.

  20. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  1. On the derivation of a creep law from isothermal bore hole convergence

    International Nuclear Information System (INIS)

    Prij, J.; Mengelers, J.H.J.

    1981-01-01

    Some analytical as well as numerical aspects relevant to the creep behaviour of cavity-like structures in salt domes are presented. Two finite element models are presented for the modelling of the bore hole configuration, both dealing with the problem of a correct choice of the amount of salts which must be taken into account. A numerical procedure is suggested to derive a material creep law from measured bore hole convergence. This procedure is applied on convergence measurement in the ASSE mine (Germany) leading to a secondary creep law (depsilon/dt)sup(c)=8.8x10 -11 sigmasup(5.5) (sigma in MPa, (depsilon/dt)sup(c) in days -1 ) which describes the transient convergence behaviour correctly. Some questions concerning the uniqueness of the derived creep law are discussed

  2. A study of the complications of small bore 'Seldinger' intercostal chest drains.

    Science.gov (United States)

    Davies, Helen E; Merchant, Shairoz; McGown, Anne

    2008-06-01

    Use of small bore chest drains (drainage over a 12-month period. One hundred consecutive small bore Seldinger (12F) chest drain insertions were evaluated. Few serious complications occurred. However, 21% of the chest drains were displaced ('fell out') and 9% of the drains became blocked. This contributed to high morbidity rates, with 13% of patients requiring repeat pleural procedures. The frequency of drain blockage in pleural effusion was reduced by administration of regular normal saline drain flushes (odds ratio for blockage in flushed drains compared with non-flushed drains 0.04, 95% CI: 0.01-0.37, P < 0.001). Regular chest drain flushes are advocated in order to reduce rates of drain blockage, and further studies are needed to determine optimal fixation strategies that may reduce associated patient morbidity.

  3. Characterization of the excavation disturbance caused by boring of the experimental full scale deposition holes in the Research Tunnel of Olkiluoto

    International Nuclear Information System (INIS)

    Autio, J.

    1997-09-01

    Three holes, the size of deposition holes, were bored in the Research Tunnel using a novel full-face boring technique. During the boring test, procedures were carried out in order to determine the effect of changes in operating parameters on the performance of the boring machine and the quality of the hole. Evaluation of the quality of the hole included studies of the geometry of the holes, measurements of surface roughness using a laser profilometer, rock mechanical determinations and study of excavation disturbances in the zone adjacent to the surface of the holes using two novel methods, the He-gas method and the 14 C-polymethylmethacrylate ( 14 C-PMMA) method. It was found that there is a distinct disturbed zone adjacent to the surface of the full scale deposition holes which can be divided into three different zones. The zones are as follows: a crushed zone penetrating to a depth of about 3 mm from the surface, a fractured zone extending to a depth of 6 - 10 mm from the crushed zone and a micro fractured zone extending to a depth of 15 - 31 mm from the fractured zone. The porosity of the rock in the disturbed zone measured using the 14 C-PMMA method was clearly greater than the porosity of undisturbed rock to a depth of about 11 mm. The values of permeability and effective diffusion coefficient in the disturbed zone measured in a direction perpendicular to the disturbed surface were found to be approximately one order of magnitude larger than those of undisturbed rock. The degree of disturbance was found to be greater where higher levels of thrust had been employed during the boring process. The results obtained also suggest that the disturbance caused by using 4- and 5-row cutters in the cutter head is more pronounced than the disturbance caused when using 5- and 6-row cutters

  4. Gun bore flaw image matching based on improved SIFT descriptor

    Science.gov (United States)

    Zeng, Luan; Xiong, Wei; Zhai, You

    2013-01-01

    In order to increase the operation speed and matching ability of SIFT algorithm, the SIFT descriptor and matching strategy are improved. First, a method of constructing feature descriptor based on sector area is proposed. By computing the gradients histogram of location bins which are parted into 6 sector areas, a descriptor with 48 dimensions is constituted. It can reduce the dimension of feature vector and decrease the complexity of structuring descriptor. Second, it introduce a strategy that partitions the circular region into 6 identical sector areas starting from the dominate orientation. Consequently, the computational complexity is reduced due to cancellation of rotation operation for the area. The experimental results indicate that comparing with the OpenCV SIFT arithmetic, the average matching speed of the new method increase by about 55.86%. The matching veracity can be increased even under some variation of view point, illumination, rotation, scale and out of focus. The new method got satisfied results in gun bore flaw image matching. Keywords: Metrology, Flaw image matching, Gun bore, Feature descriptor

  5. Investigation of the structure of filter cakes from bore flushing

    Energy Technology Data Exchange (ETDEWEB)

    Hartmann, A; Oezerler, M; Marx, C; Hartmann, A; Oezerler, M; Marx, C; Poege, S; Young, F

    1985-01-01

    After a description of the tasks and functions of the filter cake in bores, the requirements for filter cakes are explained. The aim of the investigation is finding a correlation between the filter cake structures and the prehistory of flushing. The technique of preparing the samples and previous results from investigations with electron microscopes are introduced and discussed.

  6. Chemical and mechanical bioerosion of boring sponges from Mexican Pacific coral reefs.

    Science.gov (United States)

    Nava, Héctor; Carballo, José Luis

    2008-09-01

    Species richness (S) and frequency of invasion (IF) by boring sponges on living colonies of Pocillopora spp. from National Park Isla Isabel (México, East Pacific Ocean) are presented. Twelve species belonging to the genera Aka, Cliona, Pione, Thoosa and Spheciospongia were found, and 56% of coral colonies were invaded by boring sponges, with Cliona vermifera Hancock 1867 being the most abundant species (30%). Carbonate dissolution rate and sediment production were quantified for C. vermifera and Cliona flavifodina Rützler 1974. Both species exhibited similar rates of calcium carbonate (CaCO3) dissolution (1.2+/-0.4 and 0.5+/-0.2 kg CaCO3 m(-2) year(-1), respectively, mean +/- s.e.m.), and sediment production (3.3+/-0.6 and 4.6+/-0.5 kg CaCO3 m(-2) year(-1)), resulting in mean bioerosion rates of 4.5+/-0.9 and 5.1+/-0.5 kg CaCO3 m(-2) year(-1), respectively. These bioerosion rates are close to previous records of coral calcification per unit of area, suggesting that sponge bioerosion alone can promote disequilibrium in the reef accretion/destruction ratio in localities that are heavily invaded by boring sponges. The proportion of dissolved material by C. vermifera and C. flavifodina (27 and 10.2%, respectively) confirms that chemical bioerosion plays an important role in sponge bioerosion and in the CaCO3 cycle in coral reefs.

  7. Influence of friction on buckling of a drill string in the circular channel of a bore hole

    Directory of Open Access Journals (Sweden)

    Valery Gulyayev

    2016-10-01

    Full Text Available Abstract Enhancement of technology and techniques for drilling deep directed oil and gas bore hole is one of the most important problems of the current petroleum industry. Not infrequently, the drilling of these bore holes is attended by occurrence of extraordinary situations associated with technical accidents. Among these is the Eulerian loss of stability of a drill string in the channel of a curvilinear bore hole. Methods of computer simulation should play a dominant role in prediction of these states. In this paper, a new statement of the problem of critical buckling of the drill strings in 3D curvilinear bore holes is proposed. It is based on combined use of the theory of curvilinear elastic rods, Eulerian theory of stability, theory of channel surfaces, and methods of classical mechanics of systems with nonlinear constraints. It is noted that the stated problem is singularly perturbed and its solutions have the shapes of localized harmonic wavelets. The calculation results showed that the friction effects lead to essential redistribution of internal axial forces, as well as changing the eigenmode shapes and sites of their localization. These features make the buckling phenomena less predictable and raise the role of computer simulation of these effects.

  8. High Frequency Field Measurements of an Undular Bore Using a 2D LiDAR Scanner

    Directory of Open Access Journals (Sweden)

    Kévin Martins

    2017-05-01

    Full Text Available The secondary wave field associated with undular tidal bores (known as whelps has been barely studied in field conditions: the wave field can be strongly non-hydrostatic, and the turbidity is generally high. In situ measurements based on pressure or acoustic signals can therefore be limited or inadequate. The intermittent nature of this process in the field and the complications encountered in the downscaling to laboratory conditions also render its study difficult. Here, we present a new methodology based on LiDAR technology to provide high spatial and temporal resolution measurements of the free surface of an undular tidal bore. A wave-by-wave analysis is performed on the whelps, and comparisons between LiDAR, acoustic and pressure-derived measurements are used to quantify the non-hydrostatic nature of this phenomenon. A correction based on linear wave theory applied on individual wave properties improves the results from the pressure transducer (Root mean square error, R M S E of 0 . 19 m against 0 . 38 m; however, more robust data is obtained from an upwards-looking acoustic sensor despite high turbidity during the passage of the whelps ( R M S E of 0 . 05 m. Finally, the LiDAR scanner provides the unique possibility to study the wave geometry: the distribution of measured wave height, period, celerity, steepness and wavelength are presented. It is found that the highest wave from the whelps can be steeper than the bore front, explaining why breaking events are sometimes observed in the secondary wave field of undular tidal bores.

  9. Fast Determination of Toxic Arsenic Species in Food Samples Using Narrow-bore High-Performance Liquid-Chromatography Inductively Coupled Plasma Mass Spectrometry.

    Science.gov (United States)

    Terol, Amanda; Marcinkowska, Monika; Ardini, Francisco; Grotti, Marco

    2016-01-01

    A new method for the speciation analysis of arsenic in food using narrow-bore high-performance liquid-chromatography inductively coupled plasma mass spectrometry (HPLC-ICP-MS) has been developed. Fast separation of arsenite, arsenate, monomethylarsonic acid and dimethylarsinic acid was carried out in 7 min using an anion-exchange narrow-bore Nucleosil 100 SB column and 12 mM ammonium dihydrogen phosphate of pH 5.2 as the mobile phase, at a flow rate of 0.3 mL min(-1). A PFA-ST micronebulizer jointed to a cyclonic spray chamber was used for HPLC-ICP-MS coupling. Compared with standard-bore HPLC-ICP-MS, the new method has provided higher sensitivity, reduced mobile-phase consumption, a lower matrix plasma load and a shorter analysis time. The achieved instrumental limits of detection were in the 0.3 - 0.4 ng As mL(-1) range, and the precision was better than 3%. The arsenic compounds were efficiently (>80%) extracted from various food samples using a 1:5 methanol/water solution, with additional ultrasonic treatment for rice products. The applicability of this method was demonstrated by the analysis of several samples, such as seafood (fish, mussels, shrimps, edible algae) and rice-based products (Jasmine and Arborio rice, spaghetti, flour, crackers), including three certified reference materials.

  10. Estimation of strength parameters of small-bore metal-polymer pipes

    Science.gov (United States)

    Shaydakov, V. V.; Chernova, K. V.; Penzin, A. V.

    2018-03-01

    The paper presents results from a set of laboratory studies of strength parameters of small-bore metal-polymer pipes of type TG-5/15. A wave method was used to estimate the provisional modulus of elasticity of the metal-polymer material of the pipes. Longitudinal deformation, transverse deformation and leak-off pressure were determined experimentally, with considerations for mechanical damage and pipe bend.

  11. Nuclear piping and pipe support design and operability relating to loadings and small bore piping

    International Nuclear Information System (INIS)

    Stout, D.H.; Tubbs, J.M.; Callaway, W.O.; Tang, H.T.; Van Duyne, D.A.

    1994-01-01

    The present nuclear piping system design practices for loadings, multiple support design and small bore piping evaluation are overly conservative. The paper discusses the results developed for realistic definitions of loadings and loading combinations with methodology for combining loads under various conditions for supports and multiple support design. The paper also discusses a simplified method developed for performing deadweight and thermal evaluations of small bore piping systems. Although the simplified method is oriented towards the qualification of piping in older plants, this approach is applicable to plants designed to any edition of the ASME Section III or B31.1 piping codes

  12. Chatter reduction in boring process by using piezoelectric shunt damping with experimental verification

    Science.gov (United States)

    Yigit, Ufuk; Cigeroglu, Ender; Budak, Erhan

    2017-09-01

    Chatter is a self-excited type of vibration that develops during machining due to process-structure dynamic interactions resulting in modulated chip thickness. Chatter is an important problem as it results in poor surface quality, reduced productivity and tool life. The stability of a cutting process is strongly influenced by the frequency response function (FRF) at the cutting point. In this study, the effect of piezoelectric shunt damping on chatter vibrations in a boring process is studied. In piezoelectric shunt damping method, an electrical impedance is connected to a piezoelectric transducer which is bonded on cutting tool. Electrical impedance of the circuit consisting of piezoceramic transducer and passive shunt is tuned to the desired natural frequency of the cutting tool in order to maximize damping. The optimum damping is achieved in analytical and finite element models (FEM) by using a genetic algorithm focusing on the real part of the tool point FRF rather than the amplitude. Later, a practical boring bar is considered where the optimum circuit parameters are obtained by the FEM. Afterwards, the effect of the optimized piezoelectric shunt damping on the dynamic rigidity and absolute stability limit of the cutting process are investigated experimentally by modal analysis and cutting tests. It is both theoretically and experimentally shown that application of piezoelectric shunt damping results in a significant increase in the absolute stability limit in boring operations.

  13. Neutron activation for logging the distribution of gold in bore-hole cores

    International Nuclear Information System (INIS)

    Rahmanian, H.; Watterson, J.I.W.

    1992-01-01

    A new method for the non-destructive determination of gold in bore-hole cores has been developed using instrumental neutron activation analysis with a 252 Cf source. The procedure obtains the distribution and concentration of gold along the longitudinal axis of the core i.e. a log of the gold concentration. The accuracy of the method is comparable to fire assay at a level of 2 ppm and has a detection limit of 1 ppm under the conditions used. The assay of the gold is carried out by employing a novel variation of the conventional comparator method using gold wires as both standard and flux monitor. A method is described for logging gold in bore-hole cores using neutron activation with a 160 μg 252 Cf neutron source. The method has a limit of detection of about 1 ppm under the described conditions. (author)

  14. Development of large bore superconducting magnet for wastewater treatment application

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Hui Ming; Xu, Dong; Shen, Fuzhi; Zhang, Hengcheng; Li, Lafeng [State Key Laboratory of Technologies in Space Cryogenic Propellants, Technical Institute of Physics and Chemistry, Chinese Academy of Sciences, Beijing (China)

    2017-03-15

    Water issue, especially water pollution, is a serious issue of 21st century. Being an significant technique for securing water resources, superconducting magnetic separation wastewater system was indispensable. A large bore conduction-cooled magnet was custom-tailored for wastewater treatment. The superconducting magnet has been designed, fabricated and tested. The superconducting magnet was composed of NbTi solenoid coils with an effective horizontal warm bore of 400 mm and a maximum central field of 2.56T. The superconducting magnet system was cooled by a two-stage 1.5W 4K GM cryocooler. The NbTi solenoid coils were wound around an aluminum former that is thermally connected to the second stage cold head of the cryocooler through a conductive copper link. The temperature distribution along the conductive link was measured during the cool-down process as well as at steady state. The magnet was cooled down to 4.8K in approximately 65 hours. The test of the magnetic field and quench analysis has been performed to verify the safe operation for the magnet system. Experimental results show that the superconducting magnet reached the designed magnetic performance.

  15. Automatic detection of ''bore slug'' in tubes; Detection automatique des manques de metal internes sur tubes

    Energy Technology Data Exchange (ETDEWEB)

    Bisiaux, B.; Deutsch, S.; Tailleux, O.; Mette, F. [CEV Vallourec, Aulnoye (France)

    2001-07-01

    During the tube manufacturing for the petroleum industry, the lacks of internal metal (called Bore Slug) can be created during the hot rolling. These large defects are not good detected by the classic UT and by the wall thickness measurement. That's why VALLOUREC developed an automatic UT device which works by transmission. Nevertheless, this system is too little selective and can cause no doubtful pipes (tubes good detected bad). We adapted a Bore Slug control system on the VMOG UK RP20 at the end of August. The results are rather good and showed a good detection of the Bore Slug and very little no doubtful pipes. (authors)

  16. Detailed design of the large-bore 8 T superconducting magnet for the NAFASSY test facility

    Science.gov (United States)

    Corato, V.; Affinito, L.; Anemona, A.; Besi Vetrella, U.; Di Zenobio, A.; Fiamozzi Zignani, C.; Freda, R.; Messina, G.; Muzzi, L.; Perrella, M.; Reccia, L.; Tomassetti, G.; Turtù, S.; della Corte, A.

    2015-03-01

    The ‘NAFASSY’ (NAtional FAcility for Superconducting SYstems) facility is designed to test wound conductor samples under high-field conditions at variable temperatures. Due to its unique features, it is reasonable to assume that in the near future NAFASSY will have a preeminent role at the international level in the qualification of long coiled cables in operative conditions. The magnetic system consists of a large warm bore background solenoid, made up of three series-connected grading sections obtained by winding three different Nb3Sn Cable-in-Conduit Conductors. Thanks to the financial support of the Italian Ministry for University and Research the low-field coil is currently under production. The design has been properly modified to allow the system to operate also as a stand-alone facility, with an inner bore diameter of 1144 mm. This magnet is able to provide about 7 T on its axis and about 8 T close to the insert inner radius, giving the possibility of performing a test relevant for large-sized NbTi or medium-field Nb3Sn conductors. The detailed design of the 8 T magnet, including the electro-magnetic, structural and thermo-hydraulic analysis, is here reported, as well as the production status.

  17. Imaging system models for small-bore DOI-PET scanners

    International Nuclear Information System (INIS)

    Takahashi, Hisashi; Kobayashi, Tetsuya; Yamaya, Taiga; Murayama, Hideo; Kitamura, Keishi; Hasegawa, Tomoyuki; Suga, Mikio

    2006-01-01

    Depth-of-interaction (DOI) information, which improves resolution uniformity in the field of view (FOV), is expected to lead to high-sensitivity PET scanners with small-bore detector rings. We are developing small-bore PET scanners with DOI detectors arranged in hexagonal or overlapped tetragonal patterns for small animal imaging or mammography. It is necessary to optimize the imaging system model because these scanners exhibit irregular detector sampling. In this work, we compared two imaging system models: (a) a parallel sub-LOR model in which the detector response functions (DRFs) are assumed to be uniform along the line of responses (LORs) and (b) a sub-crystal model in which each crystal is divided into a set of smaller volumes. These two models were applied to the overlapped tetragonal scanner (FOV 38.1 mm in diameter) and the hexagonal scanner (FOV 85.2 mm in diameter) simulated by GATE. We showed that the resolution non-uniformity of system model (b) was improved by 40% compared with that of system model (a) in the overlapped tetragonal scanner and that the resolution non-uniformity of system model (a) was improved by 18% compared with that of system model (b) in the hexagonal scanner. These results indicate that system model (b) should be applied to the overlapped tetragonal scanner and system model (a) should be applied to the hexagonal scanner. (author)

  18. Plasma immersion ion implantation of the interior surface of a large cylindrical bore using an auxiliary electrode

    International Nuclear Information System (INIS)

    Zeng, X.C.; Kwok, T.K.; Liu, A.G.; Chu, P.K.; Tang, B.Y.

    1998-01-01

    A model utilizing cold, unmagnetized, and collisionless fluid ions as well as Boltzmann electrons is used to comprehensively investigate the sheath expansion into a translationally invariant large bore in the presence of an auxiliary electrode during plasma immersion ion implantation (PIII) of a cylindrical bore sample. The governing equation of ion continuity, ion motion, and Poisson close-quote s equation are solved by using a numerical finite difference method for different cylindrical bore radii, auxiliary electrode radii, and voltage rise times. The ion density and ion impact energy at the cylindrical inner surface, as well as the ion energy distribution, maximum ion impact energy, and average ion impact energy for the various cases are obtained. Our results show a dramatic improvement in the impact energy when an auxiliary electrode is used and the recommended normalized auxiliary electrode radius is in the range of 0.1 endash 0.3. copyright 1998 American Institute of Physics

  19. On the Interaction between a Tunnel Boring Machine and the Surrounding Soil

    NARCIS (Netherlands)

    Festa, D.

    2015-01-01

    The thesis investigates the mechanical equilibrium of a Tunnel Boring Machine (TBM) driving in soft soil. The interaction between the TBM-shield and the soil is also investigated. The analysis is based on monitoring data gathered during the construction of the Hubertus tunnel in The Hague,

  20. Experimental Study on Post Grouting Bearing Capacity of Large Diameter Bored Piles

    Directory of Open Access Journals (Sweden)

    Wang Duanduan

    2015-01-01

    Full Text Available Post grouting can improve the inherent defects such as the formation of the mud cake at pile side and the sediment at pile end in the process of bored pile construction. Thus post grouting has been widely used in Engineering. The purpose of this paper is to research the influences of post grouting to pile bearing capacity more systematically and intuitively. Combined with the static load test of four test piles in Weihe River Bridge test area of new airport highway in Xi’an, the bearing capacity and settlement of routine piles and post grouting piles are comparatively analyzed. The test results show that under the same geological condition, post grouting can improve the properties of pile tip and pile shaft soil of bored piles significantly, enhance the ultimate resistance, improve the ultimate bearing capacity and reduce the pile tip settlement. Then post grouting can aim to optimize pile foundation.

  1. Outcome of ultrasound-guided small-bore catheter drainage in exudative pleural effusions.

    Science.gov (United States)

    Kiranantawat, Nantaka; Sungsiri, Jitpreedee; Geater, Sarayut L

    2014-05-01

    To evaluate the outcome and safety of ultrasound-guided percutaneous catheter drainage of exudative pleural effusion. The present study was a retrospective analysis of 412 pleural effusions from 373 patients that underwent ultrasound-guided small-bore catheter drainage in exudative pleural effusions between 2004 and 2009. The two most common causes for drainage were parapneumonic effusion or empyema (52.2%) and malignant effusion (30.3%), while the remains were trauma, iatrogenic, and others. Overall clinical success rate was 76.5%. The success rate was lower among malignant pleural effusion (p = 0.003). Causes of effusion were the only independent predictors related to success. Only five (1.2%) patients developed complication during the procedure. Seventy-five of 412 effusions (15.8%) developed complication during the period of drainage; the majority were drain blockage (9%) and accidental dislodgment (4.1%). Ultrasound-guided small-bore catheter drainage was a safe and efficient procedure for exudative pleural effusions.

  2. Determination of bore efficiency loss employed as powder in boral fabrication, proportionately to the dimension of grain; Determination de la reduction d'efficacite du bore ou d'un autre absorbeur employe sous forme de poudre dissemine dans un produit non absorbant, en fonction de la grosseur des grains

    Energy Technology Data Exchange (ETDEWEB)

    Laforge, P; Millot, J P [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1957-07-01

    Authors' mind was attracted by the importance of bore granulometry when employed as powder in boral fabrication. The calculation, object of this report, permits to give values for bore efficiency loss, proportionately to the dimension of spherical or ellipsoidal supposed grains. Grains to be employed should exceptionally only exceed 20 {mu} for a correspondent efficiency loss of 8 per cent about. (author) [French] L'attention des auteurs a ete attiree sur l'importance de la granulometrie du bore employe sous forme de poudre dans la fabrication du boral. Le calcul qui fait l'objet de ce rapport permet de chiffrer la perte d'efficacite du bore en fonction de la dimension des grains supposes spheriques ou ellipsoidaux. Les grains a employer ne devraient qu'exceptionnellement etre superieurs a 20 microns, ce qui correspond a une perte d'efficacite d'environ 8 pour cent. (auteur)

  3. Evidence of cellulose digestion in the wood boring isopod Sphaeroma terebrans

    Science.gov (United States)

    Lori K. Benson; Stanley A. Rice; Bruce R. Johnson

    1999-01-01

    Sphaeroma terebrans Bate is a widespread estuarine, wood-boring, isopod found in red mangrove (Rhizophora mangle) forests of tropical and subtropical estuarine waters. Because it causes extensive damage to man-made structures in marine coastal zones and is resistant to common methods of wood preservation it is important to understand fully how S. terebrans uses the...

  4. Seismic damping factors of small-bore piping as influenced by insulation and support elements

    International Nuclear Information System (INIS)

    Severud, L.K.; Anderson, M.J.; Barta, D.A.

    1983-01-01

    Seismic damping tests of a prototypical Liquid Metal Fast Breeder Reactor (LMFBR) small-bore piping system is described, and measured transient responses to pulse excitations are reported. The test specimen was representative of a typical LMFBR insulated small-bore piping system, and it was supported from a rigid test fame by prototypic dead-weight supports, mechanical snubbers, and pipe clamps. Various support configurations were tested to assess the reponse sensitivity to insulation and use of mechanical snubbers. Factors much higher than the magnitudes currently allowed in design, by the USNRC Regulatory Guide 1.61, were found. This verified the design values but also pointed out the possibility of undue conservatism and costly overdesign resulting from use of the present design values

  5. A geostatistical estimation of zinc grade in bore-core samples

    International Nuclear Information System (INIS)

    Starzec, A.

    1987-01-01

    Possibilities and preliminary results of geostatistical interpretation of the XRF determination of zinc in bore-core samples are considered. For the spherical model of the variogram the estimation variance of grade in a disk-shape sample (estimated from the grade on the circumference sample) is calculated. Variograms of zinc grade in core samples are presented and examples of the grade estimation are discussed. 4 refs., 7 figs., 1 tab. (author)

  6. SU-E-I-20: Comprehensive Quality Assurance Test of Second Generation Toshiba Aquilion Large Bore CT Simulator Based On AAPM TG-66 Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, D [Toshiba America Medical Systems, Tustin, CA (United States)

    2015-06-15

    Purpose: AAPM radiation therapy committee task group No. 66 (TG-66) published a report which described a general approach to CT simulator QA. The report outlines the testing procedures and specifications for the evaluation of patient dose, radiation safety, electromechanical components, and image quality for a CT simulator. The purpose of this study is to thoroughly evaluate the performance of a second generation Toshiba Aquilion Large Bore CT simulator with 90 cm bore size (Toshiba, Nasu, JP) based on the TG-66 criteria. The testing procedures and results from this study provide baselines for a routine QA program. Methods: Different measurements and analysis were performed including CTDIvol measurements, alignment and orientation of gantry lasers, orientation of the tabletop with respect to the imaging plane, table movement and indexing accuracy, Scanogram location accuracy, high contrast spatial resolution, low contrast resolution, field uniformity, CT number accuracy, mA linearity and mA reproducibility using a number of different phantoms and measuring devices, such as CTDI phantom, ACR image quality phantom, TG-66 laser QA phantom, pencil ion chamber (Fluke Victoreen) and electrometer (RTI Solidose 400). Results: The CTDI measurements were within 20% of the console displayed values. The alignment and orientation for both gantry laser and tabletop, as well as the table movement and indexing and scanogram location accuracy were within 2mm as specified in TG66. The spatial resolution, low contrast resolution, field uniformity and CT number accuracy were all within ACR’s recommended limits. The mA linearity and reproducibility were both well below the TG66 threshold. Conclusion: The 90 cm bore size second generation Toshiba Aquilion Large Bore CT simulator that comes with 70 cm true FOV can consistently meet various clinical needs. The results demonstrated that this simulator complies with the TG-66 protocol in all aspects including electromechanical component

  7. Maintaining Masculinity in Mid-Twentieth-Century American Psychology: Edwin Boring, Scientific Eminence, and the "Woman Problem".

    Science.gov (United States)

    Rutherford, Alexandra

    2015-01-01

    Using mid-twentieth-century American psychology as my focus, I explore how scientific psychology was constructed as a distinctly masculine enterprise and was navigated by those who did not conform easily to this masculine ideal. I show how women emerged as problems for science through the vigorous gatekeeping activities and personal and professional writings of disciplinary figurehead Edwin G. Boring. I trace Boring's intellectual and professional socialization into masculine science and his efforts to understand women's apparent lack of scientific eminence, efforts that were clearly undergirded by preexisting and widely shared assumptions about men's and women's capacities and preferences.

  8. Subsurface deposition of Cu-rich massive sulphide underneath a Palaeoproterozoic seafloor hydrothermal system—the Red Bore prospect, Western Australia

    Science.gov (United States)

    Agangi, Andrea; Reddy, S. M.; Plavsa, D.; Vieru, C.; Selvaraja, V.; LaFlamme, C.; Jeon, H.; Martin, L.; Nozaki, T.; Takaya, Y.; Suzuki, K.

    2018-02-01

    The Proterozoic Bryah and Yerrida basins of Western Australia contain important base and precious metal deposits. Here we present microtextural data, trace element and S isotope analyses of massive sulphide mineralisation hosted in Palaeoproterozoic subvolcanic rocks (dolerite) recently discovered at Red Bore. The small-scale high-grade mineralisation, which extends from the sub-surface to at least 95 m down-hole, is dominated by massive chalcopyrite and contains minor pyrite and Bi-Te-(Se) phases. Massive sulphide mineralisation is surrounded by discontinuous brecciated massive magnetite, and a narrow (data are permissive of a genetic association of Red Bore mineralisation with VHMS deposits nearby, thus suggesting a direct connection between magmatism and mineralising fluids responsible for VHMS deposition at surface. Therefore, the Red Bore mineralisation may represent the magmatic roots of a VHMS system.

  9. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  10. The Boring Billion, a slingshot for Complex Life on Earth.

    Science.gov (United States)

    Mukherjee, Indrani; Large, Ross R; Corkrey, Ross; Danyushevsky, Leonid V

    2018-03-13

    The period 1800 to 800 Ma ("Boring Billion") is believed to mark a delay in the evolution of complex life, primarily due to low levels of oxygen in the atmosphere. Earlier studies highlight the remarkably flat C, Cr isotopes and low trace element trends during the so-called stasis, caused by prolonged nutrient, climatic, atmospheric and tectonic stability. In contrast, we suggest a first-order variability of bio-essential trace element availability in the oceans by combining systematic sampling of the Proterozoic rock record with sensitive geochemical analyses of marine pyrite by LA-ICP-MS technique. We also recall that several critical biological evolutionary events, such as the appearance of eukaryotes, origin of multicellularity & sexual reproduction, and the first major diversification of eukaryotes (crown group) occurred during this period. Therefore, it appears possible that the period of low nutrient trace elements (1800-1400 Ma) caused evolutionary pressures which became an essential trigger for promoting biological innovations in the eukaryotic domain. Later periods of stress-free conditions, with relatively high nutrient trace element concentration, facilitated diversification. We propose that the "Boring Billion" was a period of sequential stepwise evolution and diversification of complex eukaryotes, triggering evolutionary pathways that made possible the later rise of micro-metazoans and their macroscopic counterparts.

  11. Interaction between groundwater and TBM (Tunnel Boring Machine) excavated tunnels

    OpenAIRE

    Font Capó, Jordi

    2012-01-01

    A number of problems, e.g. sudden inflows are encountered during tunneling under the piezometric level, especially when the excavation crosses high transmissivity areas. These inflows may drag materials when the tunnel crosses low competent layers, resulting in subsidence, chimney formation and collapses. Moreover, inflows can lead to a decrease in head level because of aquifer drainage. Tunnels can be drilled by a tunnel boring machine (TBM) to minimize inflows and groundwater impacts, restr...

  12. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  13. Enhanced hole boring with two-color relativistic laser pulses in the fast ignition scheme

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Changhai; Tian, Ye; Li, Wentao; Wang, Wentao; Zhang, Zhijun; Qi, Rong; Wang, Cheng [State Key Laboratory of High Field Laser Physics, Shanghai Institute of Optics and Fine Mechanics, Chinese Academy of Sciences, Shanghai 201800 (China); Deng, Aihua, E-mail: aihuadeng1985@gmail.com [Department of Physics and Astronomy, University of California, Los Angeles, California 90095 (United States); Liu, Jiansheng, E-mail: michaeljs-liu@siom.ac.cn [State Key Laboratory of High Field Laser Physics, Shanghai Institute of Optics and Fine Mechanics, Chinese Academy of Sciences, Shanghai 201800 (China); Collaborative Innovation Center of IFSA (CICIFSA), Shanghai Jiao Tong University, Shanghai 200240 (China)

    2016-08-15

    A scheme of using two-color laser pulses for hole boring into overdense plasma as well as energy transfer into electron and ion beams has been studied using particle-in-cell simulations. Following an ultra-short ultra-intense hole-boring laser pulse with a short central wavelength in extreme ultra-violet range, the main infrared driving laser pulse can be guided in the hollow channel preformed by the former laser and propagate much deeper into an overdense plasma, as compared to the case using the infrared laser only. In addition to efficiently transferring the main driving laser energy into energetic electrons and ions generation deep inside the overdense plasma, the ion beam divergence can be greatly reduced. The results might be beneficial for the fast ignition concept of inertial confinement fusion.

  14. Seismic damping factors of small bore piping as influenced by insulation and support elements

    International Nuclear Information System (INIS)

    Severud, L.K.; Anderson, M.J.; Barta, D.A.

    1985-01-01

    Seismic damping tests of a prototypical Liquid Metal Fast Breeder Reactor (LMFBR) small bore piping system is described, and measured transient responses to pulse excitations are reported. The test specimen was representative of a typical LMFBR insulated small bore piping system, and it was supported from a rigid test frame by prototypic dead weight supports, mechanical snubbers, and pipe clamps. Various support configurations were tested to assess the response sensitivity to insulation and other nonlinear support characteristics. Damping factors increased significantly due to the insulation and use of mechanical snubbers. Factors much higher than the magnitudes currently allowed in design by the USNRC Regulatory Guide 1.61, were found. This verified the design values, and it also pointed out the possibility of undue conservatism and costly overdesign resulting from use of the present design values

  15. Seismic damping factors of small bore piping as influenced by insulation and support elements

    International Nuclear Information System (INIS)

    Severud, L.K.; Barta, D.A.

    1983-01-01

    Seismic damping tests of a prototypical Liquid Metal Fast Breeder Reactor (LMFBR) small bore piping system is described, and measured transient responses to pulse excitations are reported. The test specimen was representative of a typical LMFBR insulated small bore piping system, and it was supported from a rigid test frame by prototypic dead weight supports, mechanical snubbers, and pipe clamps. Various support configurations were tested to assess the response sensitivity to insulation and other nonlinear support characteristics. Damping factors increased significantly due to the insulation and use of mechanical snubbers. Factors much higher than the magnitudes currently allowed in design, by the USNRC Regulatory Guide 1.61, were found. This verified the design values but also pointed out the possibility of undue conservatism and costly overdesign resulting from use of the present design values

  16. Large-diameter boring of rock bed by a reveres circulation drill; Ribasu sakyureshon doriru ni yoru daikokei ganban sakko

    Energy Technology Data Exchange (ETDEWEB)

    Sakae, S.; Torii, K. [Kajima Corp., Tokyo (Japan); Hoshino, S.; Motoyama, M.

    1995-09-25

    The Itojima Large Bridge is a road bridge of 675 m in the total length connecting together the Nagashima Island and the Itojima Island in the northwest district of Kagoshima Prefecture, having a central span of 260 m and comprising a 5-span-continuous PC cable stayed bridges and PC box girder bridges. The foundation of this bridge employs a multi-pillar type pile structure. The piling work was started in July, 1991 by a hole inset method in a severe working environment where the depth of water is 20 m, the range of the tides is 4 m, the speed of tidal current is 2 kt, the rock bed structure is complicated and the steep seabed is steeply inclined. This report describes the results of the execution of the reverse circulation drilling, which has a high general versatility in rock bed boring, using self-lifting barges and large working boats during the rock bed boring for the foundation piling for the construction of the Itojima Large Bridge. The report, especially, also introduces the details of the work that casing pipes were driven into a stable rock bed by a vibrojet method for the measure against the collapse of a bore wall which occurred during the boring work. 24 figs., 14 tabs.

  17. In-bore transrectal MRI-guided prostate biopsies: Are there risk factors for complications?

    Energy Technology Data Exchange (ETDEWEB)

    Meier-Schroers, Michael, E-mail: michael.meier@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Homsi, Rami, E-mail: rami.homsi@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Kukuk, Guido, E-mail: guido.kukuk@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Wolter, Karsten, E-mail: karsten.wolter@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Decker, Georges, E-mail: georges.decker@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Fischer, Stefan, E-mail: stefan.fischer@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Marx, Christian, E-mail: christian.marx@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Schmeel, Frederic Carsten, E-mail: carsten.schmeel@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Block, Wolfgang, E-mail: wolfgang.block@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Sprinkart, Alois Martin, E-mail: sprinkart@uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Traeber, Frank, E-mail: frank.traeber@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Schild, Hans Heinz, E-mail: hans.schild@ukb.uni-bonn.de [Department of Radiology, University of Bonn, Sigmund-Freud-Str 25, 53127 Bonn (Germany); Willinek, Winfried, E-mail: w.willinek@bk-trier.de [Department of Radiology, Neuroradiology, Sonography and Nuclear Medicine, Hospital of the Barmherzige Brüder Trier, Nordallee 1, 54292 Trier (Germany)

    2016-12-15

    Purpose: To systematically analyze risk factors for complications of in-bore transrectal MRI-guided prostate biopsies (MRGB). Materials and methods: 90 patients, who were scheduled for MRGB were included for this study. Exclusion criteria were coagulation disorders, therapy with anticoagulant drugs, and acute infections of the urinary and the lower gastrointestinal tract. Directly after, one week and one year after the biopsy, we assessed biopsy related complications (e.g. hemorrhages or signs of prostatitis). Differences between patients with and without complications were analyzed regarding possible risk factors: age, prostate volume, number of taken samples, biopsy duration, biopsy of more than one lesion, diabetes, arterial hypertension, hemorrhoids, benign prostate hyperplasia, carcinoma or prostatitis (according to histopathological analysis), and lesion localization. Complications were classified according to the Clavien-Dindo classification. Results: We observed 15 grade I complications in 90 biopsies (16.7%) with slight hematuria in 9 cases (10%), minor vasovagal reactions in 4 cases (4.4%), and urinary retention and positioning-related facial dysesthesia in 1 case each (1.1%). One patient showed acute prostatitis requiring antibiotics as the only grade II complication (1.1%). There were no adverse events that occurred later than one week. Complications grade III or higher such as pelvic abscesses, urosepsis or severe hemorrhages were not seen. There were no significant associations between the assessed risk factors and biopsy-related complications. Conclusion: In-bore transrectal MRI-guided prostate biopsies can be considered safe procedures in the diagnosis of prostate cancer with very low complication rates. There seem to be no risk factors for complications.

  18. In-bore transrectal MRI-guided prostate biopsies: Are there risk factors for complications?

    International Nuclear Information System (INIS)

    Meier-Schroers, Michael; Homsi, Rami; Kukuk, Guido; Wolter, Karsten; Decker, Georges; Fischer, Stefan; Marx, Christian; Schmeel, Frederic Carsten; Block, Wolfgang; Sprinkart, Alois Martin; Traeber, Frank; Schild, Hans Heinz; Willinek, Winfried

    2016-01-01

    Purpose: To systematically analyze risk factors for complications of in-bore transrectal MRI-guided prostate biopsies (MRGB). Materials and methods: 90 patients, who were scheduled for MRGB were included for this study. Exclusion criteria were coagulation disorders, therapy with anticoagulant drugs, and acute infections of the urinary and the lower gastrointestinal tract. Directly after, one week and one year after the biopsy, we assessed biopsy related complications (e.g. hemorrhages or signs of prostatitis). Differences between patients with and without complications were analyzed regarding possible risk factors: age, prostate volume, number of taken samples, biopsy duration, biopsy of more than one lesion, diabetes, arterial hypertension, hemorrhoids, benign prostate hyperplasia, carcinoma or prostatitis (according to histopathological analysis), and lesion localization. Complications were classified according to the Clavien-Dindo classification. Results: We observed 15 grade I complications in 90 biopsies (16.7%) with slight hematuria in 9 cases (10%), minor vasovagal reactions in 4 cases (4.4%), and urinary retention and positioning-related facial dysesthesia in 1 case each (1.1%). One patient showed acute prostatitis requiring antibiotics as the only grade II complication (1.1%). There were no adverse events that occurred later than one week. Complications grade III or higher such as pelvic abscesses, urosepsis or severe hemorrhages were not seen. There were no significant associations between the assessed risk factors and biopsy-related complications. Conclusion: In-bore transrectal MRI-guided prostate biopsies can be considered safe procedures in the diagnosis of prostate cancer with very low complication rates. There seem to be no risk factors for complications.

  19. 78 FR 79390 - Foreign-Trade Zone (FTZ) 265-Conroe, Texas, Notification of Proposed Production Activity, Bauer...

    Science.gov (United States)

    2013-12-30

    ... produce pile drivers and leads, boring machinery, foundation construction equipment, foundation casings... payments on the foreign status components used in export production. On its domestic sales, Bauer would be... and leads, boring machinery, foundation construction equipment, foundation casings, and tools and...

  20. TMI-2 core boring machine

    International Nuclear Information System (INIS)

    Croft, K.M.; Helbert, H.J.; Laney, W.M.

    1986-01-01

    An important and essential aspect of the TMI-2 defueling effort is to determine what occurred in the core region during the accident. Remote cameras and probes only portray a portion of the overall picture. What lies beneath the rubble bed and solidified sublayer is, as yet, unknown. This paper discusses the TMI-2 Core Boring Machine, which has been developed to drill into the damaged core of the TMI-2 reactor and extract stratified samples of the core. This machine, its unique support structure, positioning and leveling systems, and specially designed drill bits, combine to provide a unique mechanical system. In addition, the machine is controlled by a microprocessor; which actually controls the drilling operation, allowing relatively inexperienced operators to drill the core samples. A data acquisition system is data integral with the controlling system and collects data relative to system conditions and monitored parameters during drilling. Data obtained during the actual drilling operations are collected in a data base which will be used for actual mapping of the core region, identifying materials and stratification levels that are present

  1. Tunnel boring waste test plan

    International Nuclear Information System (INIS)

    Patricio, J.G.

    1984-03-01

    The test plan has been prepared in anticipation of the need to excavate certain repository openings by relying upon mechanical excavation techniques. The test plan proposes that specific technical issues can be resolved and key design parameters defined by excavating openings in basalt near the surface, utilizing a full face tunnel boring machine (TBM). The purpose and objective of this type of testing will define the overall feasibility and attributes of mechanical excavation in basalt. The test plan recognizes that although this technology is generally available for underground construction for some geologic settings, the current state of technology for excavation in basalt is limited and the potential for improvement is considerable. The test plan recommends that it is economically advantageous to conduct additional testing in the laboratory to allow refinement of this plan based on the laboratory results. Thus, this test plan is considered preliminary in nature, with respect to detailed testing recommendations. However, the gross design attributes and resource requirements of a near-surface TBM demonstration are considered to be valid. 15 refs., 7 figs., 3 tabs

  2. Generic methods for design of small-bore pipe supports

    International Nuclear Information System (INIS)

    Clark, G.L.; LaSalle, F.R.

    1981-01-01

    Large numbers of supports for small-bore, low-temperature pipe are utilized in nuclear power plants. These supports often must meet ASME code and project seismic design requirements. Detailed analysis for each support is time consuming and costly. This paper describes some economical generic methods developed to design and qualify supports for two-inch and smaller pipe operating at temperatures less than 300 0 F (185 0 C), on the Fast Flux Test Facility. Use of standard designs, standard support spacing tables, anchor bolt and baseplate considerations, and field qualification methods are discussed

  3. Customer Overview of Pulsed Laser Heating for Evaluation of Gun Bore Materials

    Science.gov (United States)

    2015-05-01

    properties of the gun bore materials. Ideally, well validated interior ballistics modeling has been carried out (typically with NOVA) to provide time...03002, February 2003. 5. J. Warrender, C. Mulligan, and J. Underwood , “Analysis of thermo-mechanical cracking in refractory coatings using variable pulse duration laser pulse heating,” Wear 263 1540 (2007).

  4. Measurement of in-bore side loads and comparison to first maximum yaw

    Directory of Open Access Journals (Sweden)

    Donald E. Carlucci

    2016-04-01

    Full Text Available In-bore yaw of a projectile in a gun tube has been shown to result in range loss if the yaw is significant. An attempt was made to determine if relationships between in-bore yaw and projectile First Maximum Yaw (FMY were observable. Experiments were conducted in which pressure transducers were mounted near the muzzle of a 155 mm cannon in three sets of four. Each set formed a cruciform pattern to obtain a differential pressure across the projectile. These data were then integrated to form a picture of what the overall pressure distribution was along the side of the projectile. The pressure distribution was used to determine a magnitude and direction of the overturning moment acting on the projectile. This moment and its resulting angular acceleration were then compared to the actual first maximum yaw observed in the test. The degree of correlation was examined using various statistical techniques. Overall uncertainty in the projectile dynamics was between 20% and 40% of the mean values of FMY.

  5. Primary Signet Ring Cell Carcinoma of Rectum Diagnosed by Boring Biopsy in Combination with Endoscopic Mucosal Resection

    Directory of Open Access Journals (Sweden)

    Yoshito Hirata

    2018-01-01

    Full Text Available A 46-year-old man with severe back pain visited our hospital. Magnetic resonance imaging revealed extensive bone metastasis and rectal wall thickness. Colonoscopy revealed circumferential stenosis with edematous mucosa, suggesting colon cancer. However, histological findings of biopsy specimens revealed inflammatory cells but no malignant cells. The patient underwent endoscopic ultrasound, which demonstrated edematous wall thickness without destruction of the normal layer structure. After unsuccessful detection of neoplastic cells by boring biopsies, we performed endoscopic mucosal resection followed by boring biopsies that finally revealed signet ring cell carcinoma. Herein, we present a case and provide a review of the literature.

  6. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  7. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  8. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  9. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  10. Influence of ethanol as bore fluid component on the morphological structure and performance of PES hollow fiber membrane for oil in water separation

    Energy Technology Data Exchange (ETDEWEB)

    Otitoju, Tunmise Ayode; Ahmad, Abdul Latif; Ooi, Boon Seng [Universiti Sains Malaysia, Penang (Malaysia)

    2017-10-15

    The relationships among varying bore fluid compositions containing ethanol/water were studied. The ethanol composition was varied in the ratio of 0%, 25%, 50%, 75% and 100%. The membrane dope solutions were prepared from 17.25 wt% polyethersulfone (PES), 0.75 wt% polyethylene glycol (PEG), 3 wt% silicon dioxide sol and 78.25 wt% of 1-methyl-2-pyrrolidone (NMP) via dry-jet spinning process. The membranes’ morphology as a result of varying ethanol ratio in the bore fluid composition was characterized and their effects on crude oil/water emulsion separation were evaluated. Results show that the membrane pore size and porosity decreased with increasing ethanol content in the bore fluid mixture, whereas the inner wall thickness of fibers increased. Furthermore, an increase in ethanol concentration also resulted in a slight increase in water contact angle. The use of 100/0 of ethanol/water resulted in UF membranes with the lowest performance. On the other hand, bore fluid mixture containing 25/75 ethanol/water produced membrane with the best performance for crude oil/water separation. Overall, the use of bore fluid mixture containing 25/75 ethanol/water mixture was found to be a powerful way to tune the morphological properties and performance of HF membrane.

  11. Influence of ethanol as bore fluid component on the morphological structure and performance of PES hollow fiber membrane for oil in water separation

    International Nuclear Information System (INIS)

    Otitoju, Tunmise Ayode; Ahmad, Abdul Latif; Ooi, Boon Seng

    2017-01-01

    The relationships among varying bore fluid compositions containing ethanol/water were studied. The ethanol composition was varied in the ratio of 0%, 25%, 50%, 75% and 100%. The membrane dope solutions were prepared from 17.25 wt% polyethersulfone (PES), 0.75 wt% polyethylene glycol (PEG), 3 wt% silicon dioxide sol and 78.25 wt% of 1-methyl-2-pyrrolidone (NMP) via dry-jet spinning process. The membranes’ morphology as a result of varying ethanol ratio in the bore fluid composition was characterized and their effects on crude oil/water emulsion separation were evaluated. Results show that the membrane pore size and porosity decreased with increasing ethanol content in the bore fluid mixture, whereas the inner wall thickness of fibers increased. Furthermore, an increase in ethanol concentration also resulted in a slight increase in water contact angle. The use of 100/0 of ethanol/water resulted in UF membranes with the lowest performance. On the other hand, bore fluid mixture containing 25/75 ethanol/water produced membrane with the best performance for crude oil/water separation. Overall, the use of bore fluid mixture containing 25/75 ethanol/water mixture was found to be a powerful way to tune the morphological properties and performance of HF membrane.

  12. Optical probe for porosity defect detection on inner diameter surfaces of machined bores

    Science.gov (United States)

    Kulkarni, Ojas P.; Islam, Mohammed N.; Terry, Fred L.

    2010-12-01

    We demonstrate an optical probe for detection of porosity inside spool bores of a transmission valve body with diameters down to 5 mm. The probe consists of a graded-index relay rod that focuses a laser beam spot onto the inner surface of the bore. Detectors, placed in the specular and grazing directions with respect to the incident beam, measure the change in scattered intensity when a surface defect is encountered. Based on the scattering signatures in the two directions, the system can also validate the depth of the defect and distinguish porosity from bump-type defects coming out of the metal surface. The system can detect porosity down to a 50-μm lateral dimension and ~40 μm in depth with >3-dB contrast over the background intensity fluctuations. Porosity detection systems currently use manual inspection techniques on the plant floor, and the demonstrated probe provides a noncontact technique that can help automotive manufacturers meet high-quality standards during production.

  13. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  14. Analysis and separation of boron isotopes; Analyse et separation des isotopes du bore

    Energy Technology Data Exchange (ETDEWEB)

    Perie, M [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-11-01

    The nuclear applications of boron-10 justify the study of a method of measurement of its isotopic abundance as well as of very small traces of boron in different materials. A systematic study of thermionic emission of BO{sub 2}Na{sub 2}{sup +} has been carried out. In the presence of a slight excess of alkalis, the thermionic emission is considerably reduced. On the other hand, the addition of a mixture of sodium hydroxide-glycerol (or mannitol) to borax permits to obtain an intense and stable beam. These results have permitted to establish an operative method for the analysis of traces of boron by isotopic dilution. In other respects, the needs of boron-10 in nuclear industry Justify the study of procedures of separation of isotopes of boron. A considerable isotopic effect has been exhibited in the chemical exchange reaction between methyl borate and borate salt in solution. In the case of exchange between methyl borate and sodium borate, the elementary separation factor {alpha} is: {alpha}=(({sup 11}B/{sup 10}B)vap.)/(({sup 11}B/{sup 10}B)liq.)=1.03{sub 3}. The high value of this elementary effect has been multiplied in a distillation column in which the problem of regeneration of the reactive has been resolved. An alternative procedure replacing the alkali borate by a borate of volatile base, for example diethylamine, has also been studied ({alpha}=1,02{sub 5} in medium hydro-methanolic with 2,2 per cent water). (author) [French] Les applications nucleaires du bore 10 justifient l'etude d'une methode de mesure de son abondance isotopique dans divers materiaux ainsi que le dosage de tres faibles traces de bore. Une etude systematique de l'emission thermoionique de BO{sub 2} Na{sub 2}{sup +} a ete effectuee. En presence d'un leger exces d'alcalins, l'emission thermoionique est considerablement reduite. Par contre l'addition au borax d'un melange soude-glycerol (ou mannitol) permet d'obtenir un faisceau stable et intense. Ces resultats ont permis d'etablir un mode

  15. A Dual Operational Refrigerator/Flow Cryostat with Wide Bore Medium Field Magnet for Application Demonstration

    Science.gov (United States)

    Young, E. A.; Bailey, W. O. S.; Al-Mosawi, M. K.; Beduz, C.; Yang, Y.; Chappell, S.; Twin, A.

    Since stand alone cryocooler systems have become more widely available, there has been increased commercial interest in superconductor applications in the temperature range intermediate to liquid helium and liquid nitrogen. There are however few facilities that have large in-field bore size with variable temperatures. A large bore system can reduce costs associated with full scale demonstration magnets by testing smaller coils and qualify medium length (up to meters) conductors. A 5 T, wide bore, (170 mm) Nb3Sn Oxford Instrument magnet has been integrated into a custom built dual mode refrigerator/helium flow cryostat with 600A HTS current leads. In one mode the system can be used with zero field without cost of liquid helium relying for cooling on a Sumitomo GM cryocooler with 1.5W at 4.2K: (no He) this can be used either as the sole characterisation method, or as a preliminary check before more expensive and extensive measurements are taken. The first measurements using MgB2 wire from 10 to 20K were made using a transient current step of ∼5s duration, as opposed to a DC measurement. This has the advantage of not requiring thermal equilibrium to be achieved at nominal current. The feasibility of this technique for determining critical transport properties is discussed.

  16. Comparative characterization of the quaternary deposits of Northwest Peninsular Malaysia by wash boring and CPTU site investigation methods

    Science.gov (United States)

    Selamat, Mohamad R.; Rosli, Ros N.; Ramli, Muhd H.; Azmi, Mastura; Kumaravelu, Prakash; Govindasamy, Darvintharen

    2017-10-01

    A site investigation by wash boring method was carried out in the compound of the Engineering Campus, Universiti Sains Malaysia, in Northwest Peninsular Malaysia. The subsurface soils of the region are known to be comprised of quaternary deposits including the prominent marine clays of the Gula formation. The conventional Standard Penetration Test, or SPT, was carried out for every 1.5m depth. The 18 disturbed samples collected were tested for grain size distribution, Atterberg limits, and specific gravity; and categorized according to the unified soil classification system. The results indicate low SPT numbers, or SPTN, i.e. SPTN8 for depths deeper than 12m. Samples from shallower than 12m were mostly classified as low plasticity clay, or CL, which represents the soft marine clay while the underlying materials were mostly sands, namely poorly graded sand, or SP, silty sand, or SM, clayey sand, or SC, and well graded sand, or SW. Another site investigation by the CPTU method was also carried out 5m from the wash boring position, penetrating the entire soft clay stratum, thus giving another marine clay characterization in addition to the one given by the first method. The CPTU results generally gave SPTN≤2 for depths lesser than 8m, 2≤;SPTN≤4 for depths between 8 and 12m, and SPTN=23 at 12.5m, where the CPTU test terminated. The CPTU method classified the soft materials as sensitive fine grains, clays, and clayey silts to silty clays. Thus the CPTU results did not agree very well with the conventional wash boring SPT results in terms of the SPTN obtained. Nevertheless both methods equally identified the prominent presence of the soft marine clay stratum in the top 12.5m and the underlying strong sandy bed with higher bearing capacity values.

  17. A Shear-Wave Seismic System to Look Ahead of a Tunnel Boring Machine

    NARCIS (Netherlands)

    Bharadwaj, Pawan; Drijkoningen, G.G.; Mulder, W.A.; Tscharner, Thomas; Jenneskens, Rob

    2016-01-01

    The Earth’s properties, composition and structure ahead of a tunnel boring machine (TBM) should be mapped for hazard assessment during excavation. We study the use of seismic-exploration techniques for this purpose. We focus on a seismic system for soft soils, where shear waves are better and easier

  18. Ultra narrow bore thick film capillaries for microcolumn separations. Part 1. GC experiments

    NARCIS (Netherlands)

    Steenackers, D.; Sandra, P.J.F.; Sandra, P.; Devos, G.

    1993-01-01

    Ultra narrow bore (50 mum 1.0.) fused silica columns were statically coated with apolar stationary phases to obtain beta values ranging from 6.25 to 50 (filmthickness 2 to 0.25 mum). Performance of the 1 and 2 mum columns in Capillary Gas Chromatography (CGC) is highlighted.

  19. New concept of tunnel boring machine: high performance using water jet and diamond wire as rock cutting technology

    Directory of Open Access Journals (Sweden)

    Rafael Pacheco dos Santos

    Full Text Available Abstract Tunnel boring machines are important tools in underground infrastructure projects. Although being well established equipment, these machinesare based on designsof more than 60 years ago and are characterized by big dimensions, enormous weight and high power consumption. Commercial aspects should be noted too. The model adopted by the TBM industry requires constant replacement of cutter discs and specific labor skills, usually offered by the same manufacturingcompany. In some cases the cost of replacement parts and technical assistance can be higher than the acquisition cost of an entire machine. These aspects are no longer compatible with the concept of sustainability that is an important aspect of currentsociety. While the technical characteristics require a large quantity of steel and several inputs, the adoptedmodel is not competitive. One alternative is looking for new technologies that break the old paradigms and allow the development of high performance concepts with lower social and environmental impact. This studydealswith this opportunity by proposing a high performance tunnel boring machine that makes use of high power water jet and diamond wire to compose a double shield cutter head. It works in two stages. In the fristone, an annular cut is executed by hydrodemolition,and in the second one, the diamond wire station slices the rock core. Only with the action of diamond wire is the rock core separated from the rock mass and the removal process is finished. A smart water jet nozzle movement system is described and non circular tunnels can be executed. The new technologies involved requirea different type of backup system, lighter and smaller. The non-existence of mechanical contact between the equipment and the rock mass at theexcavation front allows low power consumption. The advanced rate and primary excavation cost analyses can also be encountered herein. It shows that it is possible to reach an advanced rate of 174 m/day in

  20. An MRI-Conditional External Cardiac Defibrillator for Resuscitation Within the MRI Scanner Bore

    Science.gov (United States)

    Schmidt, Ehud J.; Watkins, Ronald D.; Zviman, Menekhem M.; Guttman, Michael A.; Wang, Wei; Halperin, Henry A.

    2016-01-01

    Background Subjects undergoing cardiac arrest within an MRI scanner are currently removed from the bore and then from the MRI suite, prior to delivery of CPR and defibrillation, potentially increasing risk of mortality. This precludes many higher-risk (acute-ischemic, acute-stroke) patients from undergoing MRI imaging and MRI-guided intervention. An MRI-conditional cardiac defibrillator should enable scanning with defibrillation pads attached and the generator ON, enabling application of defibrillation within the MRI seconds after a cardiac event. An MRI-conditional external defibrillator may improve patient acceptance for MRI procedures. Methods and Results A commercial external defibrillator was rendered 1.5 Tesla MRI-conditional by addition of novel Radio-Frequency (RF) filters between the generator and commercial disposable surface-pads. The RF filters reduced emission into the MRI scanner, and prevented cable/surface-pad heating during imaging, while preserving all the defibrillator’s monitoring and delivery functions. Human volunteers were imaged using high Specific-Absorption-Rate sequences to validate MRI image quality (IQ) and lack of heating. Swine were electrically fibrillated (N=4) and thereafter defibrillated both outside and inside the MRI bore. MRI IQ was reduced by 0.8 or 1.6 dB, with the generator in monitoring mode and operating on battery or AC power, respectively. Commercial surface-pads did not create artifacts deeper than 6mm below the skin surface. RF heating was within FDA guidelines. Defibrillation was completely successful inside and outside the MRI bore. Conclusions A prototype MRI-conditional defibrillation system successfully defibrillated in the MRI without degrading image quality, or increasing the time needed for defibrillation. It can increase patient acceptance for MRI procedures. PMID:27729363

  1. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  2. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  3. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  4. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  5. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  6. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  7. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  8. Interpretation of Geological Correlation Borings 1, 2, 3 in the A/M Area of the Savannah River Site, South Carolina

    International Nuclear Information System (INIS)

    Wyatt, D.E.; Cumbest, R.J.; Aadland, R.K.; Syms, F.H.; Stephenson, D.E.; Sherrill, J.C.

    1997-06-01

    The Geophysical Correlation Boring (GCB) Program was organized to provide a comprehensive correlation capability between geological core and advanced borehole geophysical data, surface high resolution reflection seismic information and, when available, borehole geochemical and cone penetrometer data. This report provides results and initial geological interpretations of borings one, two, and three (GCB-1, GCB-2, GCB-3) located within the Upper Three Runs Watershed (A/M Area) of the Savannah River Site

  9. An Intense Traveling Airglow Front in the Upper Mesosphere-Lower Thermosphere with Characteristic of a Turbulent Bore Observed over Alice Springs, Australia

    Science.gov (United States)

    Walterscheid, R. L.; Hecht, J. H.; Hickey, M. P.; Gelinas, L. J.; Vincent, R. A.; Reid, I. M.; Woithe, J.

    2010-12-01

    The Aerospace Corporation’s Nightglow Imager observed a large step-function change in airglow in the form of a traveling front in the OH and O2 airglow emissions over Alice Springs Australia on February 2, 2003. The front exhibited a stepwise increase of nearly a factor two in the OH brightness and a stepwise decrease in the O2 brightness. The change in brightness in each layer was associated with a strong leading disturbance followed by a train of weak barely visible waves. The OH airglow brightness behind the front was the brightness night for 02 at Alice Springs that we have measured in seven years of observations. The OH brightness was among the five brightest. The event was associated with a strong phase-locked two-day wave (TDW).We have analyzed the stability conditions for the upper mesosphere and lower thermosphere and found that the airglow layers were found in a region of strong ducting. The thermal structure was obtained from combining data from the SABER instrument on the TIMED satellite and the NRLMSISE-00 model. The wind profile was obtained by combining the HWM07 model and MF radar winds from Buckland Park Australia. We found that the TDW-disturbed profile was significantly more effective in supporting a high degree of ducting than a profile based only on HWM07 winds. Dramatic wall events have been interpreted as manifestations of undular bores (e.g., Smith et al. [2003]). Undular bores are nonlinear high Froude number events that must generate an ever increasing train of waves to carry the excess energy away from the bore front. Only a very weak wave train behind the initial disturbance was seen for the Alice Springs event. The form of the amplitude ordering was not typical of a nonlinear wave train. Therefore a bore interpretation requires another means of energy dissipation, namely turbulent dissipation. We suggest that a reasonable interpretation of the observed event is a turbulent bore. We are unaware of any previous event having

  10. Bored tunnel storage of nuclear waste

    International Nuclear Information System (INIS)

    Penberthy, L.

    1983-01-01

    Contrary to the current emphasis on deep geologic disposal of high-level nuclear waste, simple bored tunnels offer many advantages. Much lower cost is important in this period of severe budget crisis. Recoverability is feasible from a tunnel in a mountain, but dubious from a flooded mine 3000 ft deep. It is quite possible that the world will need the breeder energy cycle urgently 200 years from now. In the writer's opinion, it would be a sin for our generation to make so much fertile and fissile uranium fuel unavailable for future generations. Storage conditions in a near-surface repository are much better than deep because the temperature can be kept down, pressure will be atmospheric instead of potentially 1200 psi, and flooding will not occur. The so-called ''hydrothermal'' conditions are thus completely avoided. Accordingly, endless studies of hydrogeology, water pathway times, waste-host rock interactions and the like are unnecessary, and the time for action is much shorter

  11. Frictional effects between Overton sand and a simulated casing for a bore hole

    International Nuclear Information System (INIS)

    Dong, R.G.

    1975-01-01

    A series of tests were run to simulate the frictional effects between Overton sand and the casing for a bore hole for an underground nuclear test. The objective was to find a description for this frictional interaction which can be applied to an analysis of stemming materials under field conditions

  12. A research for Class II defect Bored Pile’s Accept Criteria: A case of Penang Second Marine bridge

    Science.gov (United States)

    Huang, Kang

    2018-03-01

    The aim of this preliminary research is to study the accept criteria of class II bored pile with subtle defect. According to a detailed comparison of the existed different standards, Chinese ones are more applicable especially for the large diameter bored piles. Through the concrete coring at pile No P25-03 of this case and the comparison to the actual calculation, the Class II pile’s defects were very minor. Comparison was also made for the effects on pile structural capacities before and after repair of the defects. the feasible repair proposal may bring forward to more defects to the piles. The Class II piles don’t need any further repairation when piles have typical of similar character and sonic logging test result with P25-03‘s one. For other Class II piles with some differences in characters, verification is needed through further concrete coring on the pile. The recommendation of this research could be adopted for the similar huge marine structures which installed large diameter bored piles.

  13. An Account on marine wood-boring organisms of offshore waters of Bombay High, India

    Digital Repository Service at National Institute of Oceanography (India)

    Wagh, A.B.; Raveendran, T.V.

    An incidence of wood-boring organisms in a water column of 75 meters depth, 160 km off the Bombay coast is reported. The destruction of untreated panels of mango wood exposed for periods varying from 1-12 months was caused by eight species...

  14. An ultra-high field strength MR image-guided robotic needle delivery system for in-bore small animal interventions.

    Science.gov (United States)

    Gravett, Matthew; Cepek, Jeremy; Fenster, Aaron

    2017-11-01

    The purpose of this study was to develop and validate an image-guided robotic needle delivery system for accurate and repeatable needle targeting procedures in mouse brains inside the 12 cm inner diameter gradient coil insert of a 9.4 T MR scanner. Many preclinical research techniques require the use of accurate needle deliveries to soft tissues, including brain tissue. Soft tissues are optimally visualized in MR images, which offer high-soft tissue contrast, as well as a range of unique imaging techniques, including functional, spectroscopy and thermal imaging, however, there are currently no solutions for delivering needles to small animal brains inside the bore of an ultra-high field MR scanner. This paper describes the mechatronic design, evaluation of MR compatibility, registration technique, mechanical calibration, the quantitative validation of the in-bore image-guided needle targeting accuracy and repeatability, and demonstrated the system's ability to deliver needles in situ. Our six degree-of-freedom, MR compatible, mechatronic system was designed to fit inside the bore of a 9.4 T MR scanner and is actuated using a combination of piezoelectric and hydraulic mechanisms. The MR compatibility and targeting accuracy of the needle delivery system are evaluated to ensure that the system is precisely calibrated to perform the needle targeting procedures. A semi-automated image registration is performed to link the robot coordinates to the MR coordinate system. Soft tissue targets can be accurately localized in MR images, followed by automatic alignment of the needle trajectory to the target. Intra-procedure visualization of the needle target location and the needle were confirmed through MR images after needle insertion. The effects of geometric distortions and signal noise were found to be below threshold that would have an impact on the accuracy of the system. The system was found to have negligible effect on the MR image signal noise and geometric distortion

  15. Long-term influence of multiple heat extraction bore-holes; programme 3-D FRACTure and comparison with a g-function calculated with the SBM programme

    Energy Technology Data Exchange (ETDEWEB)

    Brenni, R.; Kohl, Th. [Eidgenoessische Technische Hochschule (ETH), Institut fuer Geophysik, Hoenggerberg (Switzerland); Pahud, D. [Scuola universitaria professionale della Svizzera italiana (SUPSI), Dipartimento delle costruzioni e del territorio (DCT), Laboratorio di energia, ecologia ed economia LEEE, Canobbio (Switzerland)

    2001-07-01

    For typical bore-hole heat exchangers (length of about 100 m), the long-term influence of neighbouring bore-hole heat exchangers normally appears after several years of operation, and approaches asymptotically a stationary state. Depending on the number of bore-holes involved, it may take from several tens up to several hundred of years before the magnitude of the influence stabilises. Under these conditions it is difficult to collect measurements of thermally interacting bore-hole heat exchangers. However, there is a need to be able to answer the question of the long-term influence of neighbouring borehole heat exchangers, as this situation is supposed to occur more often in the future, as the number of ground-coupled heat pump systems (GCHP system) steadily increases with time. This topic needs also to be studied if themes such as 'neighbour rights' or sustainability related to GCHP system are discussed. This report is focused on the first phase of the project, whose objective is to check the g-function calculation with a more detailed programme. Three bore-holes on an equilateral triangle is the borehole configuration chosen for the comparison between the two computer programmes FRACTure and SBM. SBM is used in the g-function mode, in order to test the concept of g-function against the more detailed programme FRACTure. The agreement between the results obtained with the two programmes indicates that for typical 100 m deep bore-holes the g-function analysis provides fast and sufficiently accurate results. (author)

  16. A cradle-shaped gradient coil to expand the clear-bore width of an animal MRI scanner

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, K M; Gati, J S; Klassen, L M; Menon, R S [Centre for Functional and Metabolic Mapping, Robarts Research Institute, The University of Western Ontario, PO Box 5015, 100 Perth Drive, London, Ontario, N6A 5K8 (Canada)], E-mail: kgilbert@imaging.robarts.ca

    2010-01-21

    The never ending quest for higher magnetic field strengths in MRI and MRS has led to small and medium bore scanners at 9.4 T and above for both human and animal use; however, these bore diameters restrict the size of object that can be accommodated when using a conventional gradient coil. By replacing a cylindrical gradient-coil insert with a single-sided gradient coil, the scanner's functionality can be extended to include localized imaging of wider samples. As a prototype, a three-axis, cradle-shaped gradient coil was designed, fabricated and implemented in a 9.4 T animal MRI scanner. Since gradient fields are required only to be monotonic over the desired field of view, the cradle gradient coil was designed to produce high gradient efficiencies (up to 2.25 mT m{sup -1} A{sup -1} over a 5 cm imaging region) at the expense of gradient linearity. A dedicated three-dimensional algorithm was developed to correct the resultant image distortion. Preliminary images of a grid phantom and a mouse demonstrated the fidelity of the algorithm in correcting image distortion of greater than 200%. Eddy currents were measured along each gradient axis. A large 65.2 (Hz mT{sup -1} m) B{sub 0} eddy current was produced by the y-axis, suggesting potential limitations of single-sided gradient coils.

  17. Measurements of cutter forces and cutter temperature of boring machine in Aespoe Hard Rock Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z.X.; Kou, S.Q.; Lindqvist, P.-A. [Luleaa Univ. of Technology (Sweden)

    2001-04-01

    This report presents both the testing methods used and the testing results obtained for cutter forces and cutter temperature during field boring in Aespoe Hard Rock Laboratory. In order to estimate the strains induced by cutter forces in the cutter shaft and choose proper transducers, first a numerical simulation was performed. The simulation results indicated that the cutter forces should be measurable by ordinary strain gauges. Furthermore, an independent three-direction loading system for laboratory calibration was set up to solve force-coupling problems appearing in field measurements. By means of the established measuring system, which was proved successfully in the laboratory, the normal forces, tangential forces, and side forces of two button cutters in the boring machine were measured in the field. In addition, the temperature in the shaft of the front cutter was measured. After the measurements of the cutter forces and cutter temperature, rock core samples were taken from the bottom and the wall of the testing borehole. Then the samples were cut, polished, and examined by means of the Scanning Electron Microscope (SEM). After that, the lengths of major cracks induced by the cutters in the rock samples were measured, and an approximate relationship between the length of the medium cracks and the relevant cutter forces was obtained. This relationship was compared with the theoretical relationship established before. Finally, according to the measured results, the cracked zones around the borehole were described. The results show that: (1) there are two kinds of cracked zones: one in the borehole wall and the other in the bottom of the borehole. The depth of the cracked zone in the borehole bottom is much larger than that in the borehole wall because the maximum normal force of the front cutter is always much larger than that of the gauge cutter. (2) Each cracked zone includes a densely cracked zone and all the longest medium cracks caused by mechanical

  18. Stakeout electronic total station construction layout boring of the experience and precision

    International Nuclear Information System (INIS)

    Xu Zhiqiang

    2012-01-01

    Electronic total station can simultaneously measure angle and distance, together with the appropriate calculation methods and operating skills, able to efficiently complete the survey work, this paper based on practical experience, theoretical analysis, based on total station introduced in setting out a few boring in the skills and the measurement of total station in the construction layout for accuracy. (authors)

  19. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  20. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  1. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  2. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  3. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  4. Flexible add-on solution for MR image-guided interventions in a closed-bore scanner environment.

    Science.gov (United States)

    Busse, Harald; Garnov, Nikita; Thörmer, Gregor; Zajonz, Dirk; Gründer, Wilfried; Kahn, Thomas; Moche, Michael

    2010-09-01

    MRI is of great clinical utility for the guidance of various diagnostic and therapeutic procedures. In a standard closed-bore scanner, the simplest approach is to manipulate the instrument outside the bore and move the patient into the bore for reference and control imaging only. Without navigational assistance, however, such an approach can be difficult, inaccurate, and time consuming. Therefore, an add-on navigation solution is described that addresses these limitations. Patient registration is established by an automatic, robust, and fast (<30 sec) localization of table-mounted MR reference markers and the instrument is tracked optically. Good hand-eye coordination is provided by following the virtual instrument on MR images that are reconstructed in real time from the reference data. Needle displacements of 2.2 +/- 0.6 mm and 3.9 +/- 2.4 mm were determined in a phantom (P < 0.05), depending on whether the reference markers were placed at smaller (98-139 mm) or larger (147-188 mm) distances from the isocenter. Clinical functionality of the navigation concept is demonstrated by a double oblique, subscapular hook-wire insertion in a patient with a body mass index of 30.1 kg/m(2). Ease of use, compactness, and flexibility of this technique suggest that it can be used for many other procedures in different body regions. More patient cases are needed to evaluate clinical performance and workflow. 2010 Wiley-Liss, Inc.

  5. Geotechnical maps for recommendation on bored pile capacity in Nakhon Ratchasima municipality, Thailand

    Directory of Open Access Journals (Sweden)

    Suksun Horpibulsuk

    2013-08-01

    Full Text Available This paper presents the development of geotechnical maps in Nakhon Ratchasima municipality, Nakhon Ratchasima province, Thailand based on the boring logs and in situ test results collected from public and private sector sources. The standard penetration number, N was used to identify the soil type. The soil deposits in Nakhon Ratchasima municipality are divided into three layers: medium-to-stiff silty clay with N 50. The medium-to-stiff silty clay layer has a thickness varying from 1.8 to 7.5 metres and an average N value of 14 with a relatively low standard deviation of 1.08. The first hard silty clay layer has a thickness varying from 1.2 to 3.0 metres and an average N value of 42 with a standard deviation of 1.37. For a practical application in foundation engineering in which the pile tips of the bored piles are located in the second hard stratum with N > 50, eight pile tip zones with approximated load capacity are recommended for pile lengths of 3-10 metres.

  6. Fragmentation Energy-Saving Theory of Full Face Rock Tunnel Boring Machine Disc Cutters

    Science.gov (United States)

    Zhang, Zhao-Huang; Gong, Guo-Fang; Gao, Qing-Feng; Sun, Fei

    2017-07-01

    Attempts to minimize energy consumption of a tunnel boring machine disc cutter during the process of fragmentation have largely focused on optimizing disc-cutter spacing, as determined by the minimum specific energy required for fragmentation; however, indentation tests showed that rock deforms plastically beneath the cutters. Equations for thrust were developed for both the traditional, popularly employed disc cutter and anew design based on three-dimensional theory. The respective energy consumption for penetration, rolling, and side-slip fragmentations were obtained. A change in disc-cutter fragmentation angles resulted in a change in the nature of the interaction between the cutter and rock, which lowered the specific energy of fragmentation. During actual field excavations to the same penetration length, the combined energy consumption for fragmentation using the newly designed cutters was 15% lower than that when using the traditional design. This paper presents a theory for energy saving in tunnel boring machines. Investigation results showed that the disc cutters designed using this theory were more durable than traditional designs, and effectively lowered the energy consumption.

  7. Plastohydrodynamic drawing and coating of stainless steel wire using a tapered bore die of no metal to metal contact

    Science.gov (United States)

    Hasan, S.; Basmage, O.; Stokes, J. T.; Hashmi, M. S. J.

    2018-05-01

    A review of wire coating studies using plasto-hydrodynamic pressure shows that most of the works were carried out by conducting experiments simultaneously with simulation analysis based upon Bernoulli's principle and Euler and Navier-Stokes (N-S) equations. These characteristics relate to the domain of Computational Fluid Dynamics (CFD) which is an interdisciplinary topic (Fluid Mechanics, Numerical Analysis of Fluid flow and Computer Science). This research investigates two aspects: (i) simulation work and (ii) experimentation. A mathematical model was developed to investigate the flow pattern of the molten polymer and pressure distribution within the wire-drawing dies, assessment of polymer coating thickness on the coated wires and speed of coating on the wires at the outlet of the drawing dies, without deploying any pressurizing pump. In addition to a physical model which was developed within ANSYS™ environment through the simulation design of ANSYS™ Workbench. The design was customized to simulate the process of wire-coating on the fine stainless-steel wires using drawing dies having different bore geometries such as: stepped parallel bore, tapered bore and combined parallel and tapered bore. The convergence of the designed CFD model and numerical and physical solution parameters for simulation were dynamically monitored for the viscous flow of the polypropylene (PP) polymer. Simulation results were validated against experimental results and used to predict the ideal bore shape to produce a thin coating on stainless wires with different diameter. Simulation studies confirmed that a specific speed should be attained by the stainless-steel wires while passing through the drawing dies. It has been observed that all the speed values within specific speed range did not produce a coating thickness having the desired coating characteristic features. Therefore, some optimization of the experimental set up through design of experiments (Stat-Ease) was applied to

  8. A study on optimal scan conditions of big bore multi-slice computed tomography based on radiation dose and image noise

    International Nuclear Information System (INIS)

    Lee, J. S.; Ye, S. J.; Kim, E. H.

    2011-01-01

    The newly introduced Big Bore computed tomography (CT) has a possibility to increase the tube current product scan time (mA s) for compensation of image degradation due to larger gentry opening without sound guideline. The objective of this paper is to derive optimal scan conditions for Big Bore CT scanner, mainly relating to the dose of diagnostic CT. The weighted CT dose index (CTDI w ) was estimated at five typical protocols, such as head and neck, brain, paediatric, chest and abdomen. Noises were analysed in a circle of 1 or 2 cm of diameter in CT image slice. The results showed that measured CTDI w values generally follow the theoretical rule at all scanning conditions of every protocol. Although image noises decrease with increment of mA s, analysed image noises do follow the theoretical rule, but only in specific protocols. This phenomenon is presumed to result from the photon energy spectra arriving at the detection system of the Big Bore scanner. (authors)

  9. Ion acceleration by laser hole-boring into plasmas

    International Nuclear Information System (INIS)

    Pogorelsky, I. V.; Dover, N. P.; Babzien, M.; Bell, A. R.; Dangor, A. E.; Horbury, T.; Palmer, C. A. J.; Polyanskiy, M.; Schreiber, J.; Schwartz, S.; Shkolnikov, P.; Yakimenko, V.; Najmudin, Z.

    2012-01-01

    By experiment and simulations, we study the interaction of an intense CO 2 laser pulse with slightly overcritical plasmas of fully ionized helium gas. Transverse optical probing is used to show a recession of the front plasma surface with an initial velocity >10 6 m/s driven by hole-boring by the laser pulse and the resulting radiation pressure driven electrostatic shocks. The collisionless shock propagates through the plasma, dissipates into an ion-acoustic solitary wave, and eventually becomes collisional as it slows further. These observations are supported by PIC simulations which prove the conclusion that monoenergetic protons observed in our earlier reported experiment with a hydrogen jet result from ion trapping and reflection from a shock wave driven through the plasma.

  10. Distribution and biomass estimation of shell-boring algae in the intertidal area at Goa India

    Digital Repository Service at National Institute of Oceanography (India)

    Raghukumar, C.; Sharma, S.; Lande, V.

    The distribution and frequency of shell-boring green and blue-green algae in the intertidal at Goa, India were studied. The green alga Gomontia sp. and the blue green algae Hyella caespitosa Bornet et Flahault, H. gigas Lucas et Golubic...

  11. Magnetic susceptibility measurements of boring cores obtained from regional hydrological study project

    International Nuclear Information System (INIS)

    Hasegawa, Ken

    2010-02-01

    We measured the magnetic susceptibility of boring cores obtained from the Regional Hydrological Study Project to interpret the aeromagnetic survey data which was carried out in Tono area with about 40km square surrounding Tono Geoscience Center. The result of measurements indicates that the magnetic susceptibility of the Toki Granite is not distributed uniformly and the maximum value becomes two orders in magnitude larger than its minimum value. (author)

  12. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  13. Feasibility study and technical proposal for seismic monitoring of tunnel boring machine in Olkiluoto

    Energy Technology Data Exchange (ETDEWEB)

    Saari, J.; Lakio, A. (AF-Consult Ltd, Vantaa (Finland))

    2009-01-15

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of the ONKALO. The possibility to excavate an illegal access to the ONKALO, have been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in the ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal excavation by blasts. In this report a possibility of seismic monitoring of illegal excavation done by tunnel boring machine (TBM) has been investigated. Characteristics of the seismic signal generated by the raise boring machine are described. According to this study, it can be concluded that the generated seismic signal can be detected and the source of the signal can be located. However, this task calls for different kind of monitoring system than that, which is currently used for monitoring microearthquakes and explosions. The presented technical proposal for seismic monitoring of TBM in Olkiluoto is capable to detect and locate TBM coming outside the ONKALO area about two months before it would reach the ONKALO. (orig.)

  14. Feasibility study and technical proposal for seismic monitoring of tunnel boring machine in Olkiluoto

    International Nuclear Information System (INIS)

    Saari, J.; Lakio, A.

    2009-01-01

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of the ONKALO. The possibility to excavate an illegal access to the ONKALO, have been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in the ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal excavation by blasts. In this report a possibility of seismic monitoring of illegal excavation done by tunnel boring machine (TBM) has been investigated. Characteristics of the seismic signal generated by the raise boring machine are described. According to this study, it can be concluded that the generated seismic signal can be detected and the source of the signal can be located. However, this task calls for different kind of monitoring system than that, which is currently used for monitoring microearthquakes and explosions. The presented technical proposal for seismic monitoring of TBM in Olkiluoto is capable to detect and locate TBM coming outside the ONKALO area about two months before it would reach the ONKALO. (orig.)

  15. Repetitive, small-bore two-stage light gas gun

    International Nuclear Information System (INIS)

    Combs, S.K.; Foust, C.R.; Fehling, D.T.; Gouge, M.J.; Milora, S.L.

    1991-01-01

    A repetitive two-stage light gas gun for high-speed pellet injection has been developed at Oak Ridge National Laboratory. In general, applications of the two-stage light gas gun have been limited to only single shots, with a finite time (at least minutes) needed for recovery and preparation for the next shot. The new device overcomes problems associated with repetitive operation, including rapidly evacuating the propellant gases, reloading the gun breech with a new projectile, returning the piston to its initial position, and refilling the first- and second-stage gas volumes to the appropriate pressure levels. In addition, some components are subjected to and must survive severe operating conditions, which include rapid cycling to high pressures and temperatures (up to thousands of bars and thousands of kelvins) and significant mechanical shocks. Small plastic projectiles (4-mm nominal size) and helium gas have been used in the prototype device, which was equipped with a 1-m-long pump tube and a 1-m-long gun barrel, to demonstrate repetitive operation (up to 1 Hz) at relatively high pellet velocities (up to 3000 m/s). The equipment is described, and experimental results are presented. 124 refs., 6 figs., 5 tabs

  16. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  17. Echo-Planar Imaging for a 9.4 Tesla Vertical-Bore Superconducting Magnet Using an Unshielded Gradient Coil.

    Science.gov (United States)

    Kodama, Nao; Kose, Katsumi

    2016-10-11

    Echo-planar imaging (EPI) sequences were developed for a 9.4 Tesla vertical standard bore (~54 mm) superconducting magnet using an unshielded gradient coil optimized for live mice imaging and a data correction technique with reference scans. Because EPI requires fast switching of intense magnetic field gradients, eddy currents were induced in the surrounding metallic materials, e.g., the room temperature bore, and this produced serious artifacts on the EPI images. We solved the problem using an unshielded gradient coil set of proper size (outer diameter = 39 mm, inner diameter = 32 mm) with time control of the current rise and reference scans. The obtained EPI images of a phantom and a plant sample were almost artifact-free and demonstrated the promise of our approach.

  18. Echo-Planar Imaging for a 9.4 Tesla Vertical-Bore Superconducting Magnet Using an Unshielded Gradient Coil

    Science.gov (United States)

    KODAMA, Nao; KOSE, Katsumi

    2016-01-01

    Echo-planar imaging (EPI) sequences were developed for a 9.4 Tesla vertical standard bore (∼54 mm) superconducting magnet using an unshielded gradient coil optimized for live mice imaging and a data correction technique with reference scans. Because EPI requires fast switching of intense magnetic field gradients, eddy currents were induced in the surrounding metallic materials, e.g., the room temperature bore, and this produced serious artifacts on the EPI images. We solved the problem using an unshielded gradient coil set of proper size (outer diameter = 39 mm, inner diameter = 32 mm) with time control of the current rise and reference scans. The obtained EPI images of a phantom and a plant sample were almost artifact-free and demonstrated the promise of our approach. PMID:27001398

  19. Mechanics of Cutting and Boring. Part 7. Dynamics and Energetics of Axial Rotation Machines,

    Science.gov (United States)

    1981-12-01

    systematic analytical scheme that can be used to facilitate future work on the mechanics of cutting and boring machines. In the industrial sector, rock...Proceedings. Chapter 66, p. 1149-1158. Mellor, M. and I. Hawkes (1972) How to rate a hard-rock borer. World Construction, Sept, p. 21-23. (Also in Ingenieria

  20. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  1. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  2. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  3. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  4. Non-contact and contact measurement system for detecting projectile position in electromagnetic launch bore

    Science.gov (United States)

    Xu, Weidong; Yuan, Weiqun; Xu, Rong; Zhao, Hui; Cheng, Wenping; Zhang, Dongdong; Zhao, Ying; Yan, Ping

    2017-12-01

    This paper introduces a new measurement system for measuring the position of a projectile within a rapid fire electromagnetic launching system. The measurement system contains both non-contact laser shading and metal fiber contact measurement devices. Two projectiles are placed in the rapid fire electromagnetic launch bore, one in the main accelerating segment and the other in the pre-loading segment. The projectile placed in the main accelerating segment should be shot first, and then the other is loaded into the main segment from the pre-loading segment. The main driving current (I-main) can only be discharged again when the second projectile has arrived at the key position (the projectile position corresponds to the discharging time) in the main accelerating segment. So, it is important to be able to detect when the second projectile arrives at the key position in the main accelerating segment. The B-dot probe is the most widely used system for detecting the position of the projectile in the electromagnetic launch bore. However, the B-dot signal is affected by the driving current amplitude and the projectile velocity. There is no current in the main accelerating segment when the second projectile moves into this segment in rapid fire mode, so the B-dot signal for detecting the key position is invalid. Due to the presence of a high-intensity magnetic field, a high current, a high-temperature aluminum attachment, smoke and strong vibrations, it is very difficult to detect the projectile position in the bore accurately. So, other measurements need to be researched and developed in order to achieve high reliability. A measurement system based on a laser (non-contact) and metal fibers (contact) has been designed, and the integrated output signal based on this detector is described in the following paper.

  5. Monitoring pilot projects on bored tunnelling : The Second Heinenoord Tunnel and the Botlek Rail Tunnel

    NARCIS (Netherlands)

    Bakker, K.J.; De Boer, F.; Admiraal, J.B.M.; Van Jaarsveld, E.P.

    1999-01-01

    Two pilot projects for bored tunnelling in soft soil have been undertaken in the Netherlands. The monitoring was commissioned under the authority of the Centre for Underground Construction (COB). A description of the research related to the Second Heinenoord Tunnel and the Botlek Rail Tunnel will be

  6. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  7. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  8. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  9. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  10. Considerations for design of a Fourier transform mass spectrometer in the 4.2 K cold bore of a superconducting magnet.

    Science.gov (United States)

    O'Connor, Peter B

    2002-01-01

    An external source Fourier transform mass spectrometer (FTMS) constructed inside the vertical cold bore of a superconducting magnet will have dramatic advantages in effective magnetic field, noise figures, and base pressure over current commercially available external source FTMS systems. There are substantial, but solvable, difficulties in the design, primarily with regard to control of the helium boiloff rate to an acceptable level, as well as relatively minor design challenges with heat sinks, contraction of metallic ion optic elements in the extreme temperature, and tandem mass spectrometry experiments. However, the ability to construct the FTMS inside the narrow bore tube of existing, commercially available vertical bore NMR magnets will allow access to the upper magnetic field limit currently used by 900 MHz (21 Tesla) - 1 GHz (23.3 Tesla) NMR experiments. The vacuum system, simply by being held inside the cold bore at 4.2 K, will cryopump itself dropping base pressures substantially, and heat sinking the input resistor of the preamplifier to this cryogenically cooled vacuum chamber will allow reduction of the input Johnson noise by a factor of 8.4 with associated 8.4-fold improvement in signal/noise, sensitivity, and dynamic range. The simultaneous improvement of three fundamental limiting factors in the FTMS (field strength, base pressure, and Johnson noise figure) will clearly outweigh the concomitant increased helium boiloff rate particularly if this rate can be dropped to the estimated <5 L/day range. The additional use of modern cryorefrigerators will further reduce helium boiloff to zero except during MS(n) experiments and system cooldown. Copyright 2002 John Wiley & Sons, Ltd.

  11. Raise Boring of the ventilation shaft in Olkiluoto, 17. - 23.5.2006. Preliminary analysis of seismic signal

    Energy Technology Data Exchange (ETDEWEB)

    Saari, J.; Lakio, A. [AaF-Enprima Oy, Vantaa (Finland)

    2007-01-15

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of the ONKALO. The possibility to excavate an illegal access to the ONKALO, have been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in the ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal excavation by blasts. In this report a possibility of seismic monitoring of illegal excavation done by tunnel boring machine has been investigated. Characteristics of the seismic signal generated by the raise boring machine are analysed. According to this study, it can be concluded that the generated seismic signal can be detected and the source of the signal can be located. However, this task calls for different kind of monitoring system than that, which is currently used for monitoring microearthquakes and explosions. (orig.)

  12. Raise Boring of the ventilation shaft in Olkiluoto, 17. - 23.5.2006. Preliminary analysis of seismic signal

    International Nuclear Information System (INIS)

    Saari, J.; Lakio, A.

    2007-01-01

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of the ONKALO. The possibility to excavate an illegal access to the ONKALO, have been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in the ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal excavation by blasts. In this report a possibility of seismic monitoring of illegal excavation done by tunnel boring machine has been investigated. Characteristics of the seismic signal generated by the raise boring machine are analysed. According to this study, it can be concluded that the generated seismic signal can be detected and the source of the signal can be located. However, this task calls for different kind of monitoring system than that, which is currently used for monitoring microearthquakes and explosions. (orig.)

  13. Optimization of large bore gas engine

    International Nuclear Information System (INIS)

    Laiminger, S.

    1999-01-01

    This doctoral thesis is concerned with the experimental part of combustion optimization of a large bore gas engine. Nevertheless there was a very close co-operation with the simultaneous numeric simulation. The terms of reference were a systematic investigation of the optimization potential of the current combustion mode with the objective target to get a higher brake efficiency and lower NO x emissions. In a second part a new combustion mode for fuels containing H 2 , for fuels with very low heating value and for special fuels should be developed. The optimization contained all relevant components of the engine to achieve a stable and well suited combustion with short duration even with very lean mixture. After the optimization the engine was running stable with substantial lower NO x emissions. It was world-wide the first time when a gas medium-sized engine could reach a total electrical efficiency of more than 40 percent. Finally a combustion mode for gaseous fuels containing H 2 was developed. The engine is running now with direct ignition and with prechamber ignition. Both modes reach approximately the same efficiency and thermodynamic stability. (author)

  14. North American Lauraceae: terpenoid emissions, relative attraction and boring preferences of redbay ambrosia beetle, Xyleborus glabratus (coleoptera: curculionidae: scolytinae.

    Directory of Open Access Journals (Sweden)

    Paul E Kendra

    Full Text Available The invasive redbay ambrosia beetle, Xyleborus glabratus, is the primary vector of Raffaelea lauricola, a symbiotic fungus and the etiologic agent of laurel wilt. This lethal disease has caused severe mortality of redbay (Persea borbonia and swampbay (P. palustris trees in the southeastern USA, threatens avocado (P. americana production in Florida, and has potential to impact additional New World species. To date, all North American hosts of X. glabratus and suscepts of laurel wilt are members of the family Lauraceae. This comparative study combined field tests and laboratory bioassays to evaluate attraction and boring preferences of female X. glabratus using freshly-cut bolts from nine species of Lauraceae: avocado (one cultivar of each botanical race, redbay, swampbay, silkbay (Persea humilis, California bay laurel (Umbellularia californica, sassafras (Sassafras albidum, northern spicebush (Lindera benzoin, camphor tree (Cinnamomum camphora, and lancewood (Nectandra coriacea. In addition, volatile collections and gas chromatography-mass spectroscopy (GC-MS were conducted to quantify terpenoid emissions from test bolts, and electroantennography (EAG was performed to measure olfactory responses of X. glabratus to terpenoids identified by GC-MS. Significant differences were observed among treatments in both field and laboratory tests. Silkbay and camphor tree attracted the highest numbers of the beetle in the field, and lancewood and spicebush the lowest, whereas boring activity was greatest on silkbay, bay laurel, swampbay, and redbay, and lowest on lancewood, spicebush, and camphor tree. The Guatemalan cultivar of avocado was more attractive than those of the other races, but boring response among the three was equivalent. The results suggest that camphor tree may contain a chemical deterrent to boring, and that different cues are associated with host location and host acceptance. Emissions of α-cubebene, α-copaene, α-humulene, and

  15. North American Lauraceae: terpenoid emissions, relative attraction and boring preferences of redbay ambrosia beetle, Xyleborus glabratus (coleoptera: curculionidae: scolytinae).

    Science.gov (United States)

    Kendra, Paul E; Montgomery, Wayne S; Niogret, Jerome; Pruett, Grechen E; Mayfield, Albert E; MacKenzie, Martin; Deyrup, Mark A; Bauchan, Gary R; Ploetz, Randy C; Epsky, Nancy D

    2014-01-01

    The invasive redbay ambrosia beetle, Xyleborus glabratus, is the primary vector of Raffaelea lauricola, a symbiotic fungus and the etiologic agent of laurel wilt. This lethal disease has caused severe mortality of redbay (Persea borbonia) and swampbay (P. palustris) trees in the southeastern USA, threatens avocado (P. americana) production in Florida, and has potential to impact additional New World species. To date, all North American hosts of X. glabratus and suscepts of laurel wilt are members of the family Lauraceae. This comparative study combined field tests and laboratory bioassays to evaluate attraction and boring preferences of female X. glabratus using freshly-cut bolts from nine species of Lauraceae: avocado (one cultivar of each botanical race), redbay, swampbay, silkbay (Persea humilis), California bay laurel (Umbellularia californica), sassafras (Sassafras albidum), northern spicebush (Lindera benzoin), camphor tree (Cinnamomum camphora), and lancewood (Nectandra coriacea). In addition, volatile collections and gas chromatography-mass spectroscopy (GC-MS) were conducted to quantify terpenoid emissions from test bolts, and electroantennography (EAG) was performed to measure olfactory responses of X. glabratus to terpenoids identified by GC-MS. Significant differences were observed among treatments in both field and laboratory tests. Silkbay and camphor tree attracted the highest numbers of the beetle in the field, and lancewood and spicebush the lowest, whereas boring activity was greatest on silkbay, bay laurel, swampbay, and redbay, and lowest on lancewood, spicebush, and camphor tree. The Guatemalan cultivar of avocado was more attractive than those of the other races, but boring response among the three was equivalent. The results suggest that camphor tree may contain a chemical deterrent to boring, and that different cues are associated with host location and host acceptance. Emissions of α-cubebene, α-copaene, α-humulene, and calamenene were

  16. Three-dimensional rail-current distribution near the armature of simple, square-bore, two-rail railguns

    International Nuclear Information System (INIS)

    Beno, J.H.

    1991-01-01

    In this paper vector potential is solved as a three dimensional, boundary value problem for a conductor geometry consisting of square-bore railgun rails and a stationary armature. Conductors are infinitely conducting and perfect contact is assumed between rails and the armature. From the vector potential solution, surface current distribution is inferred

  17. Design of an RF Antenna for a Large-Bore, High Power, Steady State Plasma Processing Chamber for Material Separation

    International Nuclear Information System (INIS)

    Rasmussen, D.A.; Freeman, R.L.

    2001-01-01

    The purpose of this Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC, (Contractor), and Archimedes Technology Group, (Participant) is to evaluate the design of an RF antenna for a large-bore, high power, steady state plasma processing chamber for material separation. Criteria for optimization will be to maximize the power deposition in the plasma while operating at acceptable voltages and currents in the antenna structure. The project objectives are to evaluate the design of an RF antenna for a large-bore, high power, steady state plasma processing chamber for material separation. Criteria for optimization will be to maximize the power deposition in the plasma while operating at acceptable voltages and currents in the antenna structure

  18. Boring but important: a self-transcendent purpose for learning fosters academic self-regulation.

    Science.gov (United States)

    Yeager, David S; Henderson, Marlone D; Paunesku, David; Walton, Gregory M; D'Mello, Sidney; Spitzer, Brian J; Duckworth, Angela Lee

    2014-10-01

    Many important learning tasks feel uninteresting and tedious to learners. This research proposed that promoting a prosocial, self-transcendent purpose could improve academic self-regulation on such tasks. This proposal was supported in 4 studies with over 2,000 adolescents and young adults. Study 1 documented a correlation between a self-transcendent purpose for learning and self-reported trait measures of academic self-regulation. Those with more of a purpose for learning also persisted longer on a boring task rather than giving in to a tempting alternative and, many months later, were less likely to drop out of college. Study 2 addressed causality. It showed that a brief, one-time psychological intervention promoting a self-transcendent purpose for learning could improve high school science and math grade point average (GPA) over several months. Studies 3 and 4 were short-term experiments that explored possible mechanisms. They showed that the self-transcendent purpose manipulation could increase deeper learning behavior on tedious test review materials (Study 3), and sustain self-regulation over the course of an increasingly boring task (Study 4). More self-oriented motives for learning--such as the desire to have an interesting or enjoyable career--did not, on their own, consistently produce these benefits (Studies 1 and 4). 2014 APA, all rights reserved

  19. Safety precautions of Dover Channel Tunnel boring machine; Kaitei tonneru kussakuki to anzen

    Energy Technology Data Exchange (ETDEWEB)

    Kondo, Y.; Fujioka, K. [Kawasaki Heavy Industries Ltd., Kobe (Japan)

    1995-02-15

    In May 6th 1994, the Dover Channel Tunnel referred to the largest project in this century has been opened for traffic. France and England, which have been separated by the strait with a width of about 38 km, have been connected through the submarine railway tunnel and became to be a land continuation. Since Napoleon the first, who conquested European Continent, has made a tunnel construction plan towards England, in really 27th planning, the Eurotunnel, which has been a dream in Europe for 200 years, was realized. A position of this tunnel is at a depth of 100 m under marine surface, and a geology of the strait part is a chalk layer with a calcium carbonate as a main component. For a tunnel excavation, 6 units in England side, and 5 units in France side, and therefore total 11 units of tunnel boring machines were used. Out of them, in 2 tunnels for train from France side, 2 units of tunnel boring machine (TBM) made in Japan were used. In this paper a structure and excavation method of TBM was explained, and a safety countermeasure of TBM adopted in this project was outlined. 1 ref., 10 figs.

  20. D Modelling of Tunnel Excavation Using Pressurized Tunnel Boring Machine in Overconsolidated Soils

    Science.gov (United States)

    Demagh, Rafik; Emeriault, Fabrice

    2013-06-01

    The construction of shallow tunnels in urban areas requires a prior assessment of their effects on the existing structures. In the case of shield tunnel boring machines (TBM), the various construction stages carried out constitute a highly three-dimensional problem of soil/structure interaction and are not easy to represent in a complete numerical simulation. Consequently, the tunnelling- induced soil movements are quite difficult to evaluate. A 3D simulation procedure, using a finite differences code, namely FLAC3D, taking into account, in an explicit manner, the main sources of movements in the soil mass is proposed in this paper. It is illustrated by the particular case of Toulouse Subway Line B for which experimental data are available and where the soil is saturated and highly overconsolidated. A comparison made between the numerical simulation results and the insitu measurements shows that the 3D procedure of simulation proposed is relevant, in particular regarding the adopted representation of the different operations performed by the tunnel boring machine (excavation, confining pressure, shield advancement, installation of the tunnel lining, grouting of the annular void, etc). Furthermore, a parametric study enabled a better understanding of the singular behaviour origin observed on the ground surface and within the solid soil mass, till now not mentioned in the literature.

  1. The assessment of bore-hole water quality of Kakamega County, Kenya

    Science.gov (United States)

    Christine, Adika A.; Kibet, Joshua K.; Kiprop, Ambsrose K.; Were, Munyendo L.

    2018-03-01

    Numerous deleterious impacts of anthropogenic activities on water quality are typically observed in areas bursting with mineral exploitation, agricultural activities, and industrial processes. Therefore, this contribution details the water quality and water origin in selected hand-dug wells of one the most prominent mining areas in Kenya (Kakamega County). The toxicological impacts of drinking water from a mining site may include cancer and genetic aberrations largely because of the toxic effects of waterborne metals including Hg and As. Accordingly, this study focuses primarily on the investigation of heavy metals, essential elements such as Na and K. Heavy metals and essential elements were determined using spectroscopic and titrimetric techniques. The study revealed that mercury (Hg) concentration ranged between 0.00256 and 0.0611 ± 0.00005 mg/L while arsenic (As) concentration ranged from 0.0103 to 0.0119 ± 0.00005 mg/L. The concentration of potassium ranged from 2.53 to 4.08 ± 0.15 mg/L while that of sodium varied from 6.74 to 9.260 ± 0.2 mg/L. Although the concentration of cadmium was lower than that recommended by W.H.O, the concentrations of Hg, Pb, and As in Kakamega waters were higher than the internationally accepted levels. The generally high level of heavy metals in Kakamega bore-hole waters is, therefore, a public health concern that needs immediate intervention.

  2. Upgrading of seismic capacity of WWER equipment including reactor control rods and distribution systems

    International Nuclear Information System (INIS)

    Kostarev, V.

    1993-01-01

    This paper concerns the experience of CKTI VIBROSEISM firm (CVS) in seismic capacity upgrading of the WWER equipment and pipings. During the last 15 years CVS has accumulated a lot of experimental and analysis results on many of WWER units 'in former Soviet Union. That might be very useful in seismic protecting of East European Nuclear Power Plants. (author)

  3. The necessity and application of stratigraphic borings in hydrogeologic site assessments

    International Nuclear Information System (INIS)

    Sciacca, J.

    1991-01-01

    The siting and placement of monitoring wells is one of the most critical elements in hydrogeologic assessments of contaminated sites. Monitoring wells are placed to collect hydraulic and chemical concentration data to: (1) determine potential groundwater flow paths and rates: (2) analyze the nature and extent of chemical constituents in groundwater; and (3) estimate contaminant fate and transport. In many instances monitoring wells provide inappropriate or erroneous hydraulic data, do not provide coverage of potential high permeability flow pathways (such as channel sands) or may themselves create (through improper construction) a vertical conduit for contaminant flow from low permeability to high permeability units. This problem is commonly due to installing monitoring wells before conducting essential stratigraphic analysis and formulating a depositional model for the site area. This paper presents case examples where stratigraphic borings were drilled and logged in the vicinity of proposed well locations to effectively design and install the monitoring well network. The borings were continuously sampled or geophysically logged to provide a vertical profile of the borehole. In addition, the geophysical logs provided curve signatures which allowed interpretation of depositional facies. These data were used to interpret subsurface stratigraphy and effectively position monitoring wells that achieve the above objectives and prevent problems associated with faulty well positioning. This method may cost more initially. However, these initial costs are cheaper than long-term project expenses for abandoning improperly completed wells. subsequently installing supplemental monitoring wells or modifying poorly designed treatment systems which resulted from improper or insufficient data generated from the initial monitoring network

  4. MINIMALLY-INVASIVE TUBE THORACOSTOMY MADE EASY WITH A COMBINATION OF THORACIC ULTRASOUND AND SMALL BORE CHEST DRAIN KITS (12F TO 16F USING GUIDEWIRE TECHNIQUE

    Directory of Open Access Journals (Sweden)

    Venkateswararao

    2017-11-01

    Full Text Available BACKGROUND Minimally-invasive tube thoracostomy made easy with a combination of thoracic ultrasound and small bore chest drain kits (12F to16F using guidewire technique. The present study is aimed at easy and safe insertion of small bore chest drains (12F to 16F using Seldinger technique under ultrasound guidance with least discomfort to the patient. Large bore chest drains of size >20F using blunt dissection technique is painful, difficult to place in thick chest walls and technically more demanding. Placing the drains blindly basing on chest x-ray image may sometimes injure the underlying lung. MATERIALS AND METHODS Present study included 21 cases, of which 12 cases (57.1% were of pleural effusion and 9 cases (42.8% were of pneumothorax. Thoracic ultrasound was utilised by the operator for all pleural effusions and for those cases of pneumothorax who were on ventilator before tube insertion. Small bore chest drains (12F to 16F designed for guidewire technique were used in the present study. RESULTS Complete and sustainable lung expansion was seen in 19 of 21 cases (90.4%. It failed in remaining 2 cases (9.5% who had complex empyemas and hepatic hydrothorax. Pleurodesis was attempted in 6 cases (28.5% using tetracycline injectable form with success rate of 90%. Patient tolerance was good with numeric pain rating score of 1 to 3 (range 0 to 10; 0 = no pain; 5 = moderate pain; 10 = worst possible pain. CONCLUSION Using small bore chest tubes of sizes 12F to 16F designed for guidewire technique of insertion and utilising thoracic ultrasound, while insertion made the procedure easy and safe, less painful and good tolerance from patient’s point of view. Complete and sustainable lung expansion was seen in 90.4% of cases and highly efficacious for spontaneous and iatrogenic pneumothorax and in noncomplex and malignant pleural effusions. The technique is less demanding and thoracic ultrasound knowledge can be easily learnt and a combination of this

  5. Load-deflection characteristics of small-bore insulated-pipe clamps

    International Nuclear Information System (INIS)

    Severud, L.K.; Clark, G.L.

    1981-12-01

    The special insulated clamps used on both FFTF and CRBR piping utilize a Belleville spring arrangement to compensate for pipe thermal expansion. Analysis indicates that this produces a non-linear, directionally sensitive clamp spring rate. Since these spring rates influence the seismic response of a supported piping system, it was deemed necessary to evaluate them further by test. This has been accomplished for the FFTF clamps. A more standard insulated pipe clamp, which does not incorporate Belleville springs to accommodate thermal expansion, was also tested. This type clamp is simple in design, and economically attractive. It may have wide application prospects for use in LMFBR small bore auxiliary piping operating at temperatures below 427 0 C. Load deflection tests were conducted on 2.54 CM and 7.62 CM diameter samples of these commercial clamps

  6. Frictional properties of lubrication greases with the addition of nickel nanoparticles in pneumatic cylinder

    Science.gov (United States)

    Chang, Ho; Lan, Chou-Wei; Guo, Jia-Bin

    2011-12-01

    This paper studies the influence of addition of 100 nm diameter nickel nano-particles on the friction properties of synthetic grease (Li base, VG100) in pneumatic cylinder. The friction force test of pneumatic cylinder equipment measures the frictional force between seal and cylinder bore in pneumatic cylinders. The lubricants with addition of nickel nano-particles were used for lubricating the contact interface between seal and cylinder bore. The friction force test equipment employ a load cell force sensor to measure the friction force between seals and cylinder bores. Results obtained from experimental tests are compared to determine the friction force between seals and cylinder bore in pneumatic cylinders. The study leads to the conclusion that the addition of nickel nano-particles to synthetic grease results in a decrease in friction force between seals and cylinder bores in pneumatic cylinder. This tribological behavior is closely related to the deposition of nano-particles on the rubbing surfaces

  7. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  8. High-Pressure Hot-Gas Self-Acting Floating Ring Shaft Seal for Liquid Rocket Turbopumps. [tapered bore seals

    Science.gov (United States)

    Burcham, R. E.; Diamond, W. A.

    1980-01-01

    Design analysis, detail design, fabrication, and experimental evaluation was performed on two self acting floating ring shaft seals for a rocket engine turbopump high pressure 24132500 n/sq m (3500 psig) hot gas 533 K 9500 F) high speed 3142 rad/sec (30000 rmp) turbine. The initial design used Rayleigh step hydrodynamic lift pads to assist in centering the seal ring with minimum rubbing contact. The final design used a convergent tapered bore to provide hydrostatic centering force. The Rayleigh step design was tested for 107 starts and 4.52 hours total. The leakage was satisfactory; however, the design was not acceptable due to excessive wear caused by inadequate centering force and failure of the sealing dam caused by erosion damage. The tapered bore design was tested for 370 starts and 15.93 hours total. Satisfactory performance for the required life of 7.5 hours per seal was successfully demonstrated.

  9. Preference of effective Factors in suitable selection of Microtunnel boring machines (mtbm by using the fuzzy analytic hierarchy process (fahp approach

    Directory of Open Access Journals (Sweden)

    Alireza Jafari

    2011-07-01

    Full Text Available The development of underground infrastructure, environmental concerns, and economic trend is influencing society. Due to the increasingly critical nature of installations of utility systems especially in congested areas, the need for monitoring and control system has increased. The microtunneling system will therefore have to provide for possibility of minimized surface disruption. Suitable selection of Microtunneling Boring Machine (MTBM is the most curial decision that manager must be done. Because once the trenchless excavation has started, it might be too late to make any changes in equipment without extra costs and delays. Therefore, the various factors and parameters are affecting the choice of machine. In this paper discusses a developed methodology based on Fuzzy Analytic Hierarchy Process (FAHP in order to determine weights of the criteria and sub criteria and then ranking them. Within the proposed model, four criteria site, machinery, structural, labor force impact and 18 sub-criteria are specified. The linguistic level of comparisons produced by experts are tapped and constructed in a form of triangular fuzzy numbers in order to construct fuzzy pair wise comparison matrices. Therefore, FAHP uses the pair wise comparison matrices for determining the weights of the criteria and sub-criteria.

  10. Sintering of beryllium oxide with 3-4 per cent elemental boron; Frittage de l'oxyde de beryllium a 3 et 5 pour cent de bore element

    Energy Technology Data Exchange (ETDEWEB)

    Pointud, R; Rispal, Ch; Le Garec, M [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1958-07-01

    In order to manufacture a baffle absorbing neutrons of various energies, there was developed or mixture of a slower and an absorber. It is made by hot pressing impure beryllium containing boron carbide. The dense briquette has 100 x 100 x 50 mm and is machined on all her faces. She is of 2,85 density and about 3 to 4 per cent porosity, according to 5 per cent of boron. Difference of boron amount is lower than ten per cent between any two points of the briquette. (author) [French] Pour fabriquer un ecran absorbeur des neutrons d'energies diverses, on a realise l'association d'un element ralentisseur, Ie beryllium, et d'un element absorbant, le bore, par frittage sous charge d'une poudre mixte contenant de l'oxyde de beryllium technique et du carbure de bore technique. Le comprime obtenu est une brique de 100 x 100 x 50 mm, usinee sur toutes sur toutes surfaces, d'une densite de 2,85, porosite d'environ 3 a 4 pour cent pour une teneur en bore de 5 pour cent. L'heterogeneite en bore entre les differents points de cette brique est inferieure a 10 pour cent. (auteur)

  11. A bayesian nework based risk model for volume loss in soft soils in mechanized bored tunnels

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Al-Jibouri, Saad H.S.; Halman, Johannes I.M.

    2012-01-01

    Volume loss is one of the most important risks when boring a tunnel. This is particularly true when a tunnel is being constructed in soft soils. The risk of excessive volume loss, if materialised can lead to large consequences such as damage in buildings on the surface. This paper describes the

  12. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  13. New Rock Abrasivity Test Method for Tool Life Assessments on Hard Rock Tunnel Boring: The Rolling Indentation Abrasion Test (RIAT)

    Science.gov (United States)

    Macias, F. J.; Dahl, F.; Bruland, A.

    2016-05-01

    The tunnel boring machine (TBM) method has become widely used and is currently an important presence within the tunnelling industry. Large investments and high geological risk are involved using TBMs, and disc cutter consumption has a great influence on performance and cost, especially in hard rock conditions. Furthermore, reliable cutter life assessments facilitate the control of risk as well as avoiding delays and budget overruns. Since abrasive wear is the most common process affecting cutter consumption, good laboratory tests for rock abrasivity assessments are needed. A new abrasivity test method by rolling disc named Rolling Indentation Abrasion Test (RIAT) has been developed. The goal of the new test design and procedure is to reproduce wear behaviour on hard rock tunnel boring in a more realistic way than the traditionally used methods. Wear by rolling contact on intact rock samples is introduced and several rock types, covering a wide rock abrasiveness range, have been tested by RIAT. The RIAT procedure indicates a great ability of the testing method to assess abrasive wear on rolling discs. In addition and to evaluate the newly developed RIAT test method, a comprehensive laboratory testing programme including the most commonly used abrasivity test methods and the mineral composition were carried out. Relationships between the achieved results from conventional testing and RIAT results have been analysed.

  14. Bivalve wood borings of the ichnogenus Teredolites Leymerie from the Bohemian Cretaceous Basin (Upper Cretaceous, Czech Republic)

    Czech Academy of Sciences Publication Activity Database

    Kříž, J.; Mikuláš, Radek

    2006-01-01

    Roč. 13, č. 3 (2006), s. 159-174 ISSN 1042-0940 Institutional research plan: CEZ:AV0Z30130516 Keywords : Borings * Mollusca * sedimentary environment Subject RIV: EG - Zoology http://rzblx1.uni-regensburg.de/ezeit/detail.phtml?bibid=CASCR& colors =7&lang=en&jour_id=41560

  15. A 120 mm Bore Quadrupole for the Phase 1 LHC Upgrade

    CERN Document Server

    Fessia, P; Borgnolutti, F; Regis, F; Richter, D; Todesco, E

    2010-01-01

    The phase I LHC upgrade foresees the installation of a new final focusing for the high luminosity experiences in order to be able to focus the beams in the interaction points to b*~ 0.25 cm. Key element of this upgrade is a large bore (120 mm) superconducting quadrupole. This article proposes a magnet design that will make use of the LHC main dipole superconducting cable. Due to the schedule constraints and to the budget restrictions, it is mandatory to integrate in the design the maximum number of features successfully used during the LHC construction. This paper presents this design option and the rationales behind the several technical choices.

  16. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  17. On the testing fast response NPP's valves of large nominal bores and high parameters

    International Nuclear Information System (INIS)

    Majorov, A.P.; Ostretsov, I.N.

    1990-01-01

    Investigation technique for valves of large norminal bores and high parameters which is based on application of simulation effect for operation and accident loadings during movement of valve lock at bench tests with medium flow rate by 100-1000 times less than during operation is given. Loading simulation technique is provided using simulator of lock loading. Investigation results are essential to make decision concerning advisability of serial production of fittings without full-scale test conducting

  18. Increased productivity in construction of civil and mining tunnels through the use of high-capacity tunnel-boring machines and continuous belt conveyor muck haulage

    Energy Technology Data Exchange (ETDEWEB)

    Beatty, J.G.; Ganey, R.J.; Killingsworth, J.E. [Perini Corp., Chicago, IL (United States). US Heavy Division

    1994-12-31

    The use of a large diameter high production tunnel boring machine interfaced with a high capacity continuous belt conveyor system provides a highly productive and cost effective construction system for both civil and mining tunnels. Continuous advance of the tunnel boring machine for a distance of 1,000 feet (305 m) allows for very efficient operation of the system. The available cost reductions will likely prove that this approach to waste handling will make marginally viable projects economically feasible. 9 refs., 10 figs., 1 tab.

  19. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  20. Biogeography of Wood-Boring Crustaceans (Isopoda: Limnoriidae) Established in European Coastal Waters

    Science.gov (United States)

    Borges, Luísa M. S.; Merckelbach, Lucas M.; Cragg, Simon M.

    2014-01-01

    Marine wood-borers of the Limnoriidae cause great destruction to wooden structures exposed in the marine environment. In this study we collated occurrence data obtained from field surveys, spanning over a period of 10 years, and from an extensive literature review. We aimed to determine which wood-boring limnoriid species are established in European coastal waters; to map their past and recent distribution in Europe in order to infer species range extension or contraction; to determine species environmental requirements using climatic envelopes. Of the six species of wood-boring Limnoria previously reported occurring in Europe, only Limnoria lignorum, L. quadripunctata and L. tripunctata are established in European coastal waters. L. carinata and L. tuberculata have uncertain established status, whereas L. borealis is not established in European waters. The species with the widest distribution in Europe is Limnoria lignorum, which is also the most tolerant species to a range of salinities. L. quadripunctata and L. tripunctata appear to be stenohaline. However, the present study shows that both L. quadripunctata and L. tripunctata are more widespread in Europe than previous reports suggested. Both species have been found occurring in Europe since they were described, and their increased distribution is probably the results of a range expansion. On the other hand L. lignorum appears to be retreating poleward with ocean warming. In certain areas (e.g. southern England, and southern Portugal), limnoriids appear to be very abundant and their activity is rivalling that of teredinids. Therefore, it is important to monitor the distribution and destructive activity of these organisms in Europe. PMID:25313796

  1. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  2. Dosage of boron traces in graphite, uranium and beryllium oxide; Dosage de traces de bore dans le graphite, l'uranium et l'oxyde de beryllium

    Energy Technology Data Exchange (ETDEWEB)

    Coursier, J [Ecole Nationale Superieure de Physique et Chimie Industrielles, 75 - Paris (France); Hure, J; Platzer, R [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1955-07-01

    The problem of the dosage of the boron in the materials serving to the construction of nuclear reactors arises of the following way: to determine to about 0,1 ppm close to the quantities of boron of the order of tenth ppm. We have chosen the colorimetric analysis with curcumin as method of dosage. To reach the indicated contents, it is necessary to do a previous separation of the boron and the materials of basis, either by extraction of tetraphenylarsonium fluoborate in the case of the boron dosage in uranium and the beryllium oxide, either by the use of a cations exchanger resin of in the case of graphite. (M.B.) [French] Le probleme du dosage du bore dans les materiaux servant a la construction de reacteurs nucleaires se pose de la facon suivante: determiner a environ 0,1 ppm pres des quantites de bore de l'ordre de quelques dixiemes de ppm. Nous avons choisit la colorimetrie a la curcumine comme methode de dosage. Pour atteindre les teneurs indiquees, il est necessaire d'effectuer une separation prealable du bore et des materiaux de base, soit par extraction du fluoborate de tetraphenylarsonium dans le cas du dosage de bore dans l'uranium et l'oxyde de beryllium, soit par l'utilisation d'une resine echangeuse de cations dans le cas du graphite. (M.B.)

  3. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  4. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  5. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  6. Process and equipment for pressure build-up in nuclear reactor fuel rods

    International Nuclear Information System (INIS)

    Heer, W.F.; Carli, E.V. de.

    1976-01-01

    The equipment makes possible the build-up of inert gas pressure in a filled and closed fuel can, i.e. in a complete fuel rod. Handling is simple, it is suitable for mass production and only causes low processing costs. The quality, e.g. the degree of purity of the contents of the rod, remains unchangedin processing. The equipment consists of a vacuum-tight space, into which the equally vacuum tight fuel rod is introduced, and can be fixed so that its position can be reproduced unmistakeably. The vacuum space contains a connection for the inert gases and a laser arrangement. After inserting a fuel rod into the facility, this is evacuated and the fuel can has a hole bored in it by a laser beam. After fast equalisation of pressure, an inert gas at the required pressure is introduced into the chamber and the fuel rod. After the filling process is completed, the fuel can is closed again with the same laser beam. The quality of the seal obtained, i.e the leak-tightness of the fuel can, can be checked after reduction of the inert gas pressure and before taking out the fuel rod, by repeated evacuation of the chamber. Laser light energies between 13,000 and 110,000 Joule/sq cm are sufficient. Optimum results were obtained for a Zircaloy fuel can with about 52,000 Joule/sq cm. (TK) [de

  7. Prechamber ignition concepts for stationary large bore gas engines; Vorkammerzuendkonzepte fuer stationaer betriebene Grossgasmotoren

    Energy Technology Data Exchange (ETDEWEB)

    Heinz, Christoph [MTU Friedrichshafen GmbH (Germany); Kammerstaetter, Stefan; Sattelmayer, Thomas [Technische Univ. Muenchen (Germany). Lehrstuhl fuer Thermodynamik

    2012-01-15

    A testing facility for the optical investigation of ignition and combustion in large bore gas engines is described. The test rig was developed at the Institute of Thermodynamics at Technical University of Munich. Core element of the setup is an optically accessible high pressure combustion cell which can be charged, ignited, and discharged repeatedly according to the cycle times of a real engine. Until now the apparatus was used for the investigation of two different prechamber concepts. (orig.)

  8. Ultra-intense laser pulse propagation in plasmas: from classic hole-boring to incomplete hole-boring with relativistic transparency

    International Nuclear Information System (INIS)

    Weng, S M; Murakami, M; Mulser, P; Sheng, Z M

    2012-01-01

    Relativistic laser pulse propagation into homogeneous plasmas has been investigated as a function of plasma density. At first, the propagation features are compared systematically between relativistic transparency (RT) and hole-boring (HB). Paramountly, a considerably broad intermediate regime, namely the incomplete HB regime, has been found between the RT regime and the HB regime for an extremely intense circularly polarized (CP) pulse. In this regime HB proceeds in collaboration with RT, resulting in a much faster propagation speed and a higher cut-off energy of fast ions than in the classic HB regime. Similarly to the classic HB regime, formulae are presented to model the laser propagation and the ion acceleration according to the modified momentum flux balance in this incomplete HB regime. The simulations give the density boundary between this incomplete HB regime and the classic HB regime for CP pulses, which is crucial for estimating the maximum mean ion energy and the maximum conversion efficiency that can be achieved by the classic HB acceleration at a given laser intensity. For linear polarization (LP) the propagation mechanism apparently undergoes a transition in time between these two regimes. A detailed comparison between LP and circular polarization is made for these phenomena. (paper)

  9. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  10. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  11. Sintering of beryllium oxide with 3-4 per cent elemental boron; Frittage de l'oxyde de beryllium a 3 et 5 pour cent de bore element

    Energy Technology Data Exchange (ETDEWEB)

    Pointud, R.; Rispal, Ch.; Le Garec, M. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1958-07-01

    In order to manufacture a baffle absorbing neutrons of various energies, there was developed or mixture of a slower and an absorber. It is made by hot pressing impure beryllium containing boron carbide. The dense briquette has 100 x 100 x 50 mm and is machined on all her faces. She is of 2,85 density and about 3 to 4 per cent porosity, according to 5 per cent of boron. Difference of boron amount is lower than ten per cent between any two points of the briquette. (author) [French] Pour fabriquer un ecran absorbeur des neutrons d'energies diverses, on a realise l'association d'un element ralentisseur, Ie beryllium, et d'un element absorbant, le bore, par frittage sous charge d'une poudre mixte contenant de l'oxyde de beryllium technique et du carbure de bore technique. Le comprime obtenu est une brique de 100 x 100 x 50 mm, usinee sur toutes sur toutes surfaces, d'une densite de 2,85, porosite d'environ 3 a 4 pour cent pour une teneur en bore de 5 pour cent. L'heterogeneite en bore entre les differents points de cette brique est inferieure a 10 pour cent. (auteur)

  12. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  13. A Magnetic Resonance Imaging-Conditional External Cardiac Defibrillator for Resuscitation Within the Magnetic Resonance Imaging Scanner Bore.

    Science.gov (United States)

    Schmidt, Ehud J; Watkins, Ronald D; Zviman, Menekhem M; Guttman, Michael A; Wang, Wei; Halperin, Henry A

    2016-10-01

    Subjects undergoing cardiac arrest within a magnetic resonance imaging (MRI) scanner are currently removed from the bore and then from the MRI suite, before the delivery of cardiopulmonary resuscitation and defibrillation, potentially increasing the risk of mortality. This precludes many higher-risk (acute ischemic and acute stroke) patients from undergoing MRI and MRI-guided intervention. An MRI-conditional cardiac defibrillator should enable scanning with defibrillation pads attached and the generator ON, enabling application of defibrillation within the seconds of MRI after a cardiac event. An MRI-conditional external defibrillator may improve patient acceptance for MRI procedures. A commercial external defibrillator was rendered 1.5 Tesla MRI-conditional by the addition of novel radiofrequency filters between the generator and commercial disposable surface pads. The radiofrequency filters reduced emission into the MRI scanner and prevented cable/surface pad heating during imaging, while preserving all the defibrillator monitoring and delivery functions. Human volunteers were imaged using high specific absorption rate sequences to validate MRI image quality and lack of heating. Swine were electrically fibrillated (n=4) and thereafter defibrillated both outside and inside the MRI bore. MRI image quality was reduced by 0.8 or 1.6 dB, with the generator in monitoring mode and operating on battery or AC power, respectively. Commercial surface pads did not create artifacts deeper than 6 mm below the skin surface. Radiofrequency heating was within US Food and Drug Administration guidelines. Defibrillation was completely successful inside and outside the MRI bore. A prototype MRI-conditional defibrillation system successfully defibrillated in the MRI without degrading the image quality or increasing the time needed for defibrillation. It can increase patient acceptance for MRI procedures. © 2016 American Heart Association, Inc.

  14. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  15. Assembly and Test of HD2, a 36 mm bore high field Nb3Sn Dipole Magnet

    International Nuclear Information System (INIS)

    Ferracin, P.; Bingham, B.; Caspi, S.; Cheng, D.W.; Dietderich, D.R.; Felice, H.; Godeke, A.; Hafalia, A.R.; Hannaford, C.R.; Joseph, J.; Lietzke, A.F.; Lizarazo, J.; Sabbi, G.; Trillaud, F.; Wang, X.

    2008-01-01

    We report on the fabrication, assembly, and test of the Nb 3 Sn dipole magnet HD2. The magnet, aimed at demonstrating the application of Nb 3 Sn superconductor in high field accelerator-type dipoles, features a 36 mm clear bore surrounded by block-type coils with tilted ends. The coil design is optimized to minimize geometric harmonics in the aperture and the magnetic peak field on the conductor in the coil ends. The target bore field of 15 T at 4.3 K is consistent with critical current measurements of extracted strands. The coils are horizontally pre-stressed during assembly using an external aluminum shell pre-tensioned with water-pressurized bladders. Axial pre-loading of the coil ends is accomplished through two end plates and four aluminum tension rods. The strain in coil, shell, and rods is monitored with strain gauges during assembly, cool-down and magnet excitation, and compared with 3D finite element computations. Magnet's training performance, quench locations, and ramp-rate dependence are then analyzed and discussed.

  16. Percutaneous Management of Accidentally Retained Foreign Bodies During Image-Guided Non-vascular Procedures: Novel Technique Using a Large-Bore Biopsy System

    Energy Technology Data Exchange (ETDEWEB)

    Cazzato, Roberto Luigi, E-mail: gigicazzato@hotmail.it; Garnon, Julien, E-mail: juleiengarnon@gmail.com [Hôpitaux Universitaires de Strasbourg, HUS, Department of Interventional Radiology, Nouvel Hôpital Civil (France); Ramamurthy, Nitin, E-mail: nitin-ramamurthy@hotmail.com [Norfolk and Norwich University Hospital, Department of Radiology (United Kingdom); Tsoumakidou, Georgia, E-mail: georgia.tsoumakidou@chru-strasbourg.fr; Caudrelier, Jean, E-mail: jean.caudrelier@chru-strasbourg.fr; Thénint, Marie-Aude, E-mail: marie-aude.thenint@chru-strasbourg.fr; Rao, Pramod, E-mail: pramodrao@me.com; Koch, Guillaume, E-mail: guillaume.koch@chru-strasbourg.fr; Gangi, Afshin, E-mail: gangi@unistra.fr [Hôpitaux Universitaires de Strasbourg, HUS, Department of Interventional Radiology, Nouvel Hôpital Civil (France)

    2016-07-15

    ObjectiveTo describe a novel percutaneous image-guided technique using a large-bore biopsy system to retrieve foreign bodies (FBs) accidentally retained during non-vascular interventional procedures.Materials and MethodsBetween May 2013 and October 2015, five patients underwent percutaneous retrieval of five iatrogenic FBs, including a biopsy needle tip in the femoral head following osteoblastoma biopsy and radiofrequency ablation (RFA); a co-axial needle shaft within a giant desmoid tumour following cryoablation; and three post-vertebroplasty cement tails within paraspinal muscles. All FBs were retrieved immediately following original procedures under local or general anaesthesia, using combined computed tomography (CT) and fluoroscopic guidance. The basic technique involved positioning a 6G trocar sleeve around the FB long axis and co-axially advancing an 8G biopsy needle to retrieve the FB within the biopsy core. Retrospective chart review facilitated analysis of procedures, FBs, technical success, and complications.ResultsMean FB size was 23 mm (range 8–74 mm). Four FBs were located within 10 mm of non-vascular significant anatomic structures. The basic technique was successful in 3 cases; 2 cases required technical modifications including using a stiff guide-wire to facilitate retrieval in the case of the post-cryoablation FB; and using the central mandrin of the 6G trocar to push a cement tract back into an augmented vertebra when initial retrieval failed. Overall technical success (FB retrieval or removal to non-hazardous location) was 100 %, with no complications.ConclusionPercutaneous image-guided retrieval of iatrogenic FBs using a large-bore biopsy system is a feasible, safe, effective, and versatile technique, with potential advantages over existing methods.

  17. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  18. Determination of the availability of appropriate aged flight rocket motors. [captive tests to determine case bond separation and grain bore cracking

    Science.gov (United States)

    Martin, P. J.

    1974-01-01

    A program to identify surplus solid rocket propellant engines which would be available for a program of functional integrity testing was conducted. The engines are classified as: (1) upper stage and apogee engines, (2) sounding rocket and launch vehicle engines, and (3) jato, sled, and tactical engines. Nearly all the engines were available because their age exceeds the warranted shelf life. The preference for testing included tests at nominal flight conditions, at design limits, and to establish margin limits. The principal failure modes of interest were case bond separation and grain bore cracking. Data concerning the identification and characteristics of each engine are tabulated. Methods for conducting the tests are described.

  19. Improved magnetic-field homogeneity of NMR HTS bulk magnet using a new stacking structure and insertion of an HTS film cylinder into a bulk bore

    International Nuclear Information System (INIS)

    Itoh, Yoshitaka; Yanagi, Yousuke; Nakamura, Takashi

    2017-01-01

    A new type of superconducting bulk magnet for compact nuclear magnetic resonance (NMR) devices with high magnetic-field homogeneity has been developed by inserting an HTS film cylinder into a bulk superconductor bore. Annular 60 mmϕ Eu-Ba-Cu-O bulk superconductors with a larger inner diameter (ID) of 36 mm were sandwiched between bulk superconductors with a smaller ID of 28 mm, and the total height of the bulk superconductor set was made to be 120 mm. The inner height of central wide bore space was optimized by magnetic-field simulation so that the influence of the bulk superconductor's paramagnetic moment on applied field homogeneity was minimized during the magnetization process. An HTS film cylinder, in which Gd-Ba-Cu-O tapes were wound helically in three layers around a copper cylinder, was inserted into the bulk bore in order to compensate for the inhomogeneous field trapped by the bulk superconductor. The superconducting bulk magnet composed of the above bulk superconductor set and the film cylinder were cooled by a GM pulse tube refrigerator and magnetized at 4.747 T using the field cooling (FC) method and a conventional superconducting coil magnet adjusted to below 0.5 ppm in magnetic-field homogeneity. The NMR measurement was conducted for an H_2O sample with a diameter of 6.9 mm and a length of 10 mm by setting the sample in the center of the 20 mm ID room-temperature bore of the bulk magnet. The magnetic-field homogeneity derived from the full width at half maximum (FWHM) of the "1H spectrum of H_2O was 0.45 ppm. We confirmed that the HTS film inner cylinder was effective in maintaining the homogeneity of the magnetic field applied in the magnetization process, and as a result, a magnetic field with a homogeneity of less than 1 ppm can be generated in the bore of the bulk magnet without using shim coils. (author)

  20. Cost-Effectiveness Comparison of Imaging-Guided Prostate Biopsy Techniques: Systematic Transrectal Ultrasound, Direct In-Bore MRI, and Image Fusion

    NARCIS (Netherlands)

    Venderink, W.; Govers, T.M.; Rooij, M. de; Futterer, J.J.; Sedelaar, J.P.M.

    2017-01-01

    OBJECTIVE: Three commonly used prostate biopsy approaches are systematic transrectal ultrasound guided, direct in-bore MRI guided, and image fusion guided. The aim of this study was to calculate which strategy is most cost-effective. MATERIALS AND METHODS: A decision tree and Markov model were

  1. Translational Pharmacologic Efficacy Studies of Glial Growth Factor 2 (GGF2) in Spinal Cord Injury Models and in the Veterinary Clinical Setting

    Science.gov (United States)

    2015-07-01

    Center at Georgetown University. The MR imager used is a 7.0 Tesla horizontal Bruker magnet with a 20 cm bore equipped with 100 gauss/cm microimaging...gradients and run by Paravision 5.0 software. The samples were imaged in a 40 mm transmit-receive volume RF coil . To acquire anatomical images, a two...for MRI imaging at the PIRL. The MR imager used is a 7.0 Tesla horizontal Bruker magnet with a 20 cm bore equipped with 100 gauss/cm microimaging

  2. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  3. Interim staff position on environmental qualification of safety-related electrical equipment: including staff responses to public comments. Regulatory report

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1981-07-01

    This document provides the NRC staff positions regarding selected areas of environmental qualification of safety-related electrical equipment, in the resolution of Unresolved Safety Issue A-24, 'Qualification of Class IE Safety-Related Equipment.' The positions herein are applicable to plants that are or will be in the construction permit (CP) or operating license (OL) review process and that are required to satisfy the requirements set forth in either the 1971 or the 1974 version of IEEE-323 standard

  4. Radio monitoring problems, methods, and equipment

    CERN Document Server

    Rembovsky, Anatoly; Kozmin, Vladimir; Smolskiy, Sergey

    2009-01-01

    Offers a unified approach to fundamental aspects of Automated Radio Monitoring (ARM). This book discusses the development, modeling, design, and manufacture of ARM systems. It provides classification and descriptions of modern high-efficient hardware-software ARM equipment, including the equipment for detection and radio direction-finding.

  5. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  6. Electronic quality control on dental x-rays equipment

    International Nuclear Information System (INIS)

    Pomares C, Martin

    1996-09-01

    A brief description of dental x-ray equipment is done. The non-invasive quality control is treated as than the responsibilities from the dentists to the patient and the equipment. A propose for quality control for dental x-ray equipment, film and developer is include

  7. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  8. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  9. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  10. An innovative jet boring mining method available for the high grade uranium ore underground deposits

    International Nuclear Information System (INIS)

    Narcy, J.L.

    1996-01-01

    An innovative mining method, based on the capability of a high pressure water jet to desaggregate rock, has been conceived and tested with success at the highest grade uranium ore deposit in the world, the Cigar Lake deposit in Saskatchewan, Canada. 113 tonnes of ore at 13% U were mined out by a new jet-boring mining method operated on a semi-industrial basis, in 1992 during the test mining program of Cigar Lake Project. (author). 9 figs

  11. Modeling and Dynamic Analysis of Cutterhead Driving System in Tunnel Boring Machine

    Directory of Open Access Journals (Sweden)

    Wei Sun

    2017-01-01

    Full Text Available Failure of cutterhead driving system (CDS of tunnel boring machine (TBM often occurs under shock and vibration conditions. To investigate the dynamic characteristics and reduce system vibration further, an electromechanical coupling model of CDS is established which includes the model of direct torque control (DTC system for three-phase asynchronous motor and purely torsional dynamic model of multistage gear transmission system. The proposed DTC model can provide driving torque just as the practical inverter motor operates so that the influence of motor operating behavior will not be erroneously estimated. Moreover, nonlinear gear meshing factors, such as time-variant mesh stiffness and transmission error, are involved in the dynamic model. Based on the established nonlinear model of CDS, vibration modes can be classified into three types, that is, rigid motion mode, rotational vibration mode, and planet vibration mode. Moreover, dynamic responses under actual driving torque and idealized equivalent torque are compared, which reveals that the ripple of actual driving torque would aggravate vibration of gear transmission system. Influence index of torque ripple is proposed to show that vibration of system increases with torque ripple. This study provides useful guideline for antivibration design and motor control of CDS in TBM.

  12. Dynamic study of a compressed electron layer during the hole-boring stage in a sharp-front laser interaction region

    Directory of Open Access Journals (Sweden)

    W. P. Wang

    2012-08-01

    Full Text Available This study investigates the dynamics of a compressed electron layer (CEL when a circularly polarized laser pulse with a sharp front irradiates a high-density foil. A time-dependent model for CEL motion during the hole-boring stage is proposed to describe details of the interaction for any shape of laser pulse. The opacity case, where the laser pulse is totally reflected, is investigated using this model. The results obtained are consistent with the results from particle-in-cell (PIC simulations. A relaxation distance determined by the laser-front steepness is necessary to build a stable CEL state before ions rejoin into the CEL. For the transparent case, the laser-front steepness is important for the formation of the stable CEL state at the back surface of the target. Considering the motion of ions, both the CEL and ion dynamics are important to rebalance the laser pressure and electrostatic charge-separation force as the hole-boring stage changes to the light-sail stage.

  13. Deep bore well water level fluctuations in the Koyna region, India: the presence of a low order dynamical system in a seismically active environment

    Directory of Open Access Journals (Sweden)

    D. V. Ramana

    2009-05-01

    Full Text Available Water level fluctuations in deep bore wells in the vicinity of seismically active Koyna region in western India provides an opportunity to understand the causative mechanism underlying reservoir-triggered earthquakes. As the crustal porous rocks behave nonlinearly, their characteristics can be obtained by analysing water level fluctuations, which reflect an integrated response of the medium. A Fractal dimension is one such measure of nonlinear characteristics of porous rock as observed in water level data from the Koyna region. It is inferred in our study that a low nonlinear dynamical system with three variables can predict the water level fluctuations in bore wells.

  14. Seismic source characterisation of a Tunnel Boring Machine (TBM)

    Science.gov (United States)

    Kreutzer, Ingrid; Brückl, Ewald; Radinger, Alexander

    2015-04-01

    The Tunnel Seismic While Drilling (TSWD) method aims at predicting continuously the geological situation ahead of the tunnel without disturbing the construction work. Thereby the Tunnel Boring Machine (TBM) itself is used as seismic source. The cutting process generates seismic waves radiating into the rock mass and vibrations propagating to the main bearing of the cutter head. These vibrations are monitored and used as pilot signal. For the processing and interpretation it was hypothesized so far that the TBM acts like a single force. To prove this assumption the radiation pattern of several TBM's under construction were investigated. Therefore 3-components geophones were installed at the surface, which were situated directly above the tunnel axes and also with lateral offset. Additional, borehole geophones were placed in the wall of one tube of a two-tube tunnel. The geophones collected the forward and backward radiated wave field, as the TBM, operating in the other tube, passed their positions. The obtained seismic data contains continuous records over a range of 600 m of the TBM position. The offsets vary from 25 m to 400 m and the frequency ranges from 20-250 Hertz. The polarisation of the p-wave and the s-wave and their amplitude ratio were determined and compared with modelled seismograms with different source mechanism. The results show that the description of the source mechanism by a single force can be used as a first order approximation. More complex radiation pattern including tensile forces and several source locations like the transmission of reaction forces over the gripper to the tunnel wall are further tested and addressed.

  15. Comparing sensitivity and count rate performance of small-bore DOI-PET scanners by computer simulation

    International Nuclear Information System (INIS)

    Kobayashi, Tetsuya; Takahashi, Hisashi; Yamaya, Taiga; Murayama, Hideo; Kitamura, Keishi; Hasegawa, Tomoyuki; Suga, Mikio

    2006-01-01

    In the development of a dedicated small-bore DOI-PET scanner for small animals (jPET-RD), we performed Monte Carlo simulations using the GATE based on Geant4 and investigated the influence of the proximity of the detectors to the target object on the sensitivity and count rate performance. The jPET-RD is based on a large-size depth-of-interaction (DOI) block detector that consists of a 4-layered array of 32 x 32 LSO crystals (1.4 mm x 1.4 mm x 4.5 mm) and a 256-ch flat panel position-sensitive photomultiplier tube. In this work, three detector geometries were simulated: two rings of six detector blocks arranged in a hexagonal pattern (FOV 85 mm in diameter) and four detector blocks arranged in a tetragonal pattern (FOV 49 mm in diameter) and in an overlapped tetragonal pattern (FOV 38 mm in diameter). The simulation results showed that the smaller bore geometry can provide higher sensitivity because of its larger solid angle. Although it clearly affected the noise equivalent count rate (NECR) due to its high dead-time, parallel readout with appropriate anode segmentation improved the NECR at 20 MBq by a factor of 1.1 to 1.4 compared with the case of 256-ch anodes read out by one front-end circuit. (author)

  16. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  17. Fiscal 1999 geothermal development promotion survey. Structural boring survey work and analysis report (No.B-6 - Tsujinodake area); 1999 nendo chinetsu kaihatsu sokushin chosa. Kozo shisui chosa koji oyobi kaiseki hokokusho (No.B-6 Tsujinodake chiiki)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    Cuttings from bores N11-TD-2 and N11-TD-3 drilled for the purpose of confirming the existence of geothermal resources in the Tsujinodake area were examined and tested, and the results of temperature logging, electrical logging, and water injection tests carried out during the structural boring work were analyzed. Activities were conducted in the four fields of (1) test boring work, (2) survey and measurement, (3) core cutting examination, and (4) comprehensive analysis. In bore N11-TD-2 positioned in the northern part of Tsujinodake, a sharp temperature rise was detected in the clay converted alteration zone between 200m above sea level and 200m below sea level. A high temperature of 215 degrees C was recorded at 200m below sea level, and it was found that high temperature geothermal water was in reserve at the bottom of the clay converted alteration zone between 100m above sea level and 200m below sea level. In bore N11-TD-3 in the southern wall of the Ata caldera, a convection type low temperature profile was observed at a shallow level and low temperature convection of underground water was detected there. (NEDO)

  18. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  19. Dynamic nuclear polarization for magnetic resonance imaging. An in-bore approach

    Energy Technology Data Exchange (ETDEWEB)

    Krummenacker, Jan G.

    2012-07-01

    In this thesis, the development of an in-bore liquid state DNP polarizer for MRI applications operating in flow through mode at a magnetic field strength of 1.5 T was described. After an introductory chapter 1 and a chapter 2 on the theoretical background, chapter 3 dealt chiefly with the challenge of performing liquid state DNP at a high magnetic field of 9.2 T. The feasibility of performing liquid state DNP at this field was demonstrated for various solvents, as well as for metabolites in solution. Chapter 4 then moved to the aim of this work, the application of liquid state DNP for MRI experiments. It introduced the rationale of our approach, the hardware that was developed and demonstrated its performance in a clinical MRI tomograph.

  20. Dynamic nuclear polarization for magnetic resonance imaging. An in-bore approach

    International Nuclear Information System (INIS)

    Krummenacker, Jan G.

    2012-01-01

    In this thesis, the development of an in-bore liquid state DNP polarizer for MRI applications operating in flow through mode at a magnetic field strength of 1.5 T was described. After an introductory chapter 1 and a chapter 2 on the theoretical background, chapter 3 dealt chiefly with the challenge of performing liquid state DNP at a high magnetic field of 9.2 T. The feasibility of performing liquid state DNP at this field was demonstrated for various solvents, as well as for metabolites in solution. Chapter 4 then moved to the aim of this work, the application of liquid state DNP for MRI experiments. It introduced the rationale of our approach, the hardware that was developed and demonstrated its performance in a clinical MRI tomograph.

  1. Heat Flow Measurements on Beam Screens with and without Supports

    CERN Document Server

    Bozzini, D; Darve, C; Jenninger, B; Kos, N; Willems, D

    1999-01-01

    The thermal resistance between LHC beam screens and cold bores has been measured on two 10 m long models in the Cryostat Thermal Model (CTM). One beam screen was equipped with stainless steel spring supports and one had no supports and was inserted in a cold bore with reduced diameter. For both beam screens the heat load to the cold bore was well within the LHC budget that is allocated for the beam screen support system.

  2. Implementation of virtual simulation with a wide-bore multislice helcalct scanner

    International Nuclear Information System (INIS)

    Greer, P.; Kenny, J.

    2004-01-01

    Full text: Multislice large-bore CT scanners specifically designed for radiotherapy have very recently become available. The issues relating to these type of scanners in radiotherapy and the implementation of virtual simulation are therefore of much current interest. A GE LightSpeed RT 4-slice helical CT scanner with a 80 cm bore size was installed in the radiation oncology department of the Newcastle Mater Hospital. This replaced our only simulator, a conventional unit. Specific issues relating to the imaging performance, and virtual simulation process with the large-bore multislice scanner were studied to ensure an accurate radiotherapy process. The detector array fully samples a 50 cm diameter scan circle. The reconstructed diameter can be increased to 65 cm with partial sampling of the extra volume. The GE Advantage Sim (ASim) virtual simulation software was commissioned, with transfer of CT images and DICOM RT plans to the Pinnacle radiotherapy planning system (RTPS) for dose calculation. Some specific issues investigated were: 1) The image quality performance for image reconstruction with the 65 cm area compared to 50 cm was measured with a line-pair phantom. 2) The accuracy of CT numbers with lateral position was assessed with a commercial electron density phantom. 3) Couch lateral movement and sag during acquisition were measured with the couch weighted with 86 kg. 4) The accuracy of the transfer of plans from ASim to Pinnacle was verified with known plan geometries. Image resolution throughout the entire CT image was found to be significantly lower when scan reconstruction was performed with 65 cm scan circle compared to 50 cm. The 0.3, 0.38 and 0.5 1p/mm bars were clearly distinguishable with the 50 cm reconstruction compared to only the 0.3 1p/mm bars in the 65 cm reconstruction. 2) CT numbers varied significantly outside the 50 cm reconstructed area. 3) Couch lateral movement during scanning was within 1 mm. Couch sag was 4 mm at the imaging plane

  3. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  4. Alternatives Generation Analysis Long Length Contaminated Equipment Removal System Storage

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Major pieces of Characterization sampling equipment are currently stored outdoors. This includes the Long Length Contaminated Equipment receiver trailer and transportation trailer. A decision is required to determine the preferred alternative for facilities to store and maintain this equipment. The Long Length Contaminated Equipment Removal System (LLCERS) consists of many tools, mechanisms, and controllers currently stored in various locations. Much of this equipment should be protected from the elements while being stored. Some of the LLCERS equipment should be protected with some kind of roof cover. This decision analysis is to determine the best alternative for weather protection for the large equipment requiring a cover. Additional details are included in Sections 2.0 and 5.0. Key assumptions used in this analysis are detailed in Section 3.2

  5. Dosimetric impact of image artifact from a wide-bore CT scanner in radiotherapy treatment planning

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Vincent; Podgorsak, Matthew B.; Tran, Tuan-Anh; Malhotra, Harish K.; Wang, Iris Z. [Department of Radiation Medicine, Roswell Park Cancer Institute, Buffalo, New York 14263 (United States); Department of Radiation Medicine, Roswell Park Cancer Institute, Buffalo, New York 14263 and Department of Physiology and Biophysics, State University of New York at Buffalo, Buffalo, New York 14214 (United States); Department of Radiation Medicine, Roswell Park Cancer Institute, Buffalo, New York 14263 (United States); Department of Radiation Medicine, Roswell Park Cancer Institute, Buffalo, New York 14263 and Department of Physiology and Biophysics, State University of New York at Buffalo, Buffalo, New York 14214 (United States)

    2011-07-15

    Purpose: Traditional computed tomography (CT) units provide a maximum scan field-of-view (sFOV) diameter of 50 cm and a limited bore size, which cannot accommodate a large patient habitus or an extended simulation setup in radiation therapy (RT). Wide-bore CT scanners with increased bore size were developed to address these needs. Some scanners have the capacity to reconstruct the CT images at an extended FOV (eFOV), through data interpolation or extrapolation, using projection data acquired with a conventional sFOV. Objects that extend past the sFOV for eFOV reconstruction may generate image artifacts resulting from truncated projection data; this may distort CT numbers and structure contours in the region beyond the sFOV. The purpose of this study was to evaluate the dosimetric impact of image artifacts from eFOV reconstruction with a wide-bore CT scanner in radiotherapy (RT) treatment planning. Methods: Testing phantoms (i.e., a mini CT phantom with equivalent tissue inserts, a set of CT normal phantoms and anthropomorphic phantoms of the thorax and the pelvis) were used to evaluate eFOV artifacts. Reference baseline images of these phantoms were acquired with the phantom centrally positioned within the sFOV. For comparison, the phantoms were then shifted laterally and scanned partially outside the sFOV, but still within the eFOV. Treatment plans were generated for the thoracic and pelvic anthropomorphic phantoms utilizing the Eclipse treatment planning system (TPS) to study the potential effects of eFOV artifacts on dose calculations. All dose calculations of baseline and test treatment plans were carried out using the same MU. Results: Results show that both body contour and CT numbers are altered by image artifacts in eFOV reconstruction. CT number distortions of up to -356 HU for bone tissue and up to 323 HU for lung tissue were observed in the mini CT phantom. Results from the large body normal phantom, which is close to a clinical patient size, show

  6. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  7. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  8. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  9. Load-deflection characteristics of small bore insulated pipe clamps

    International Nuclear Information System (INIS)

    Severud, L.K.; Clark, G.L.

    1982-01-01

    High temperature LMFBR piping is subject to rapid temperature changes during transient events. Typically, this pipe is supported by specially designed insulated pipe clamps to prevent excessive thermal stress from developing during these transients. The special insulated clamps used on both FFTF and CRBR piping utilize a Belleville spring arrangement to compensate for pipe thermal expansion. Analysis indicates that this produces a non-linear, directionally sensitive clamp spring rate. Since these spring rates influence the seismic response of a supported piping system, it was deemed necessary to evaluate them further by test. This has been accomplished for the FFTF clamps. A more standard insulated pipe clamp, which does not incorporate Belleville springs to accommodate thermal expansion, was also tested. This type clamp is simple in design, and economically attractive. It may have wide application prospects for use in LMFBR small bore auxiliary piping operating at temperatures below 427 0 C. Load deflection tests were conducted on 2.54 CM and 7.62 CM diameter samples of these commercial clamps

  10. Geological mappability of bored versus drill and blast excavations for radioactive waste repositories

    International Nuclear Information System (INIS)

    Nilsen, B.; Ozdemir, L.

    1992-01-01

    The issue of accurate geological mappability has been subject of intense debate in the selection of bored versus drill and blast excavation for radioactive waste repositories. This paper is intended to provide an assessment of the problems usually encountered in mappability on the basis of field experience from a large number of completed tunnels, mainly as part of the Norwegian hydropower projects. The main conclusion is that mapping in a mechanically excavated underground opening, with very few exceptions, reflects the in-situ conditions more accurately than mapping in a drill and blast tunnel. This is due to the overbreak effects of drill and blast excavation, primarily

  11. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  12. Evaluation of vibration and vibration fatigue life for small bore pipe in nuclear power plants

    International Nuclear Information System (INIS)

    Wang Zhaoxi; Xue Fei; Gong Mingxiang; Ti Wenxin; Lin Lei; Liu Peng

    2011-01-01

    The assessment method of the steady state vibration and vibration fatigue life of the small bore pipe in the supporting system of the nuclear power plants is proposed according to the ASME-OM3 and EDF evaluation methods. The GGR supporting pipe system vibration is evaluated with this method. The evaluation process includes the filtration of inborn sensitivity, visual inspection, vibration tests, allowable vibration effective velocity calculation and vibration stress calculation. With the allowable vibration effective velocity calculated and the vibration velocity calculated according to the acceleration data tested, the filtrations are performed. The vibration stress at the welding coat is calculated with the spectrum method and compared with the allowable value. The response of the stress is calculated with the transient dynamic method, with which the fatigue life is evaluated with the Miners linear accumulation model. The vibration stress calculated with the spectrum method exceeds the allowable value, while the fatigue life calculated from the transient dynamic method is larger than the designed life with a big safety margin. (authors)

  13. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

    2004-05-27

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small

  14. 30 CFR 75.1400 - Hoisting equipment; general.

    Science.gov (United States)

    2010-07-01

    ... transport persons shall be equipped with brakes capable of stopping the fully loaded platform, cage, or... every two months. (d) Hoisting equipment, including automatic elevators, used to transport persons shall... required for automatically operated cages, platforms, or elevators. [48 FR 53239, Nov. 25, 1983] ...

  15. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  16. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  17. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  18. 47 CFR 15.118 - Cable ready consumer electronics equipment.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Cable ready consumer electronics equipment. 15... Unintentional Radiators § 15.118 Cable ready consumer electronics equipment. (a) All consumer electronics TV... provisions of this section. Consumer electronics TV receiving equipment that includes features intended for...

  19. Adventitious X-radiation from high voltage equipment

    International Nuclear Information System (INIS)

    Martin, E.B.M.

    1979-01-01

    The monograph is concerned with hazards of unwanted x-rays from sources such as television receivers, high voltage equipment, radar transmitters, switchgear and electron beam apparatus for welding, evaporation, analysis and microscopy. Chapters are included on units, production of x radiation, biological effects, protection standards, radiation monitoring, shielding and control of access, medical and dosimetric supervision and types of equipment. A bibliography of 92 references and other cited literature is included. (U.K.)

  20. Stud bolt handling equipment for reactor vessel

    International Nuclear Information System (INIS)

    Bunyan, T.W.

    1989-01-01

    Reactor vessel stud bolt handling equipment includes means for transferring a stud bolt to a carrier from a parking station, or vice versa. Preferably a number of stud bolts are handled simultaneously. The transfer means may include cross arms rotatable about extendable columns, and the equipment is mounted on a mobile base for movement into and out of position. Each carrier comprises a tubular socket and an expandable sleeve to grip a stud bolt. (author)

  1. Drawing evaluation report for sampling equipment drawings; TOPICAL

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  2. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...) Cranes and hoists. This paragraph applies to the installation of electric equipment and wiring used in..., and similar events. This paragraph covers the installation of portable wiring and equipment, including... 29 Labor 5 2010-07-01 2010-07-01 false Specific purpose equipment and installations. 1910.306...

  3. RAM analysis of earth pressure balance tunnel boring machines: A case study

    Directory of Open Access Journals (Sweden)

    Hasel Amini Khoshalan

    2015-12-01

    Full Text Available Earth pressure balance tunnel boring machines (EPB-TBMs are favorably applied in urban tunneling projects. Despite their numerous advantages, considerable delays and high maintenance cost are the main disadvantages these machines suffer from. Reliability, availability, and maintainability (RAM analysis is a practical technique that uses failure and repair dataset obtained over a reasonable time for dealing with proper machine operation, maintenance scheduling, cost control, and improving the availability and performance of such machines. In the present study, a database of failures and repairs of an EBP-TBM was collected in line 1 of Tabriz subway project over a 26-month interval of machine operation. In order to model the reliability of the TBM, this machine was divided into five distinct subsystems including mechanical, electrical, hydraulic, pneumatic, and water systems in a series configuration. According to trend and serial correlation tests, the renewal processes were applied, for analysis of all subsystems. After calculating the reliability and maintainability functions for all subsystems, it was revealed that the mechanical subsystem with the highest failure frequency has the lowest reliability and maintainability. Similarly, estimating the availability of all subsystems indicated that the mechanical subsystem has a relatively low availability level of 52.6%, while other subsystems have acceptable availability level of 97%. Finally, the overall availability of studied machine was calculated as 48.3%.

  4. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  5. Program plan for environmental qualification of mechanical and dynamic (including seismic) qualification of mechanical and electrical equipment program (EDQP)

    International Nuclear Information System (INIS)

    Weidenhamer, G.H.

    1986-06-01

    The equipment qualification program described in this plan is intended to provide the technical basis for resolving uncertainties in existing equipment qualification standards. In addition, research results are contributing to the resolution of safety issues GI-23, GI-87, USI-A44, titled, ''Reactor Coolant Pump Seal Failure,'' ''Failure of HPCI Steam Line Without Isolation,'' and ''Station Blackout,'' respectively. Also, research effort is being directed at providing information on the behavior of containment isolation valves under severe accident environments. Although the results of the latter research will not contribute to resolving uncertainties in qualification standards, it has proven cost effective to obtain this information under this program

  6. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  7. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  8. Cost analysis for heavy equipment in earthfill work - An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

    Science.gov (United States)

    Arifin, Muhammad Faizal Ardhiansyah

    2017-03-01

    Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.

  9. Development of the teneral adult Anoplophora glabripennis (Coleoptera: Cerambycidae): time to initiate and completely bore out of maple wood

    Science.gov (United States)

    V. Sanchez; M.A. Keena

    2013-01-01

    Anoplophora glabripennis (Motschulsky) is an introduced invasive pest with the potential to devastate hardwood forests in North America. Using artificial pupal chambers, we documented the time required by teneral adults at three temperatures (20, 25, and 30°C), 60-80% RH, and a photoperiod of 16:8 (L:D) h to initiate boring after eclosion...

  10. Feasibility of diffusion-weighted magnetic resonance imaging in patients with juvenile idiopathic arthritis on 1.0-T open-bore MRI

    Energy Technology Data Exchange (ETDEWEB)

    Barendregt, Anouk M.; Nusman, Charlotte M. [University of Amsterdam, Department of Radiology, Academic Medical Center, Amsterdam (Netherlands); University of Amsterdam, Department of Pediatric Hematology, Immunology, Rheumatology and Infectious Disease, Emma Children' s Hospital AMC, Amsterdam (Netherlands); Hemke, Robert; Lavini, Cristina; Maas, Mario [University of Amsterdam, Department of Radiology, Academic Medical Center, Amsterdam (Netherlands); Amiras, Dimitri [Imperial College Healthcare NHS Trust, Radiology Department, St. Mary' s Hospital, Paddington, London (United Kingdom); Kuijpers, Taco W. [University of Amsterdam, Department of Pediatric Hematology, Immunology, Rheumatology and Infectious Disease, Emma Children' s Hospital AMC, Amsterdam (Netherlands)

    2015-12-15

    To evaluate the feasibility of non-invasive diffusion-weighted imaging (DWI) of the knee of children with juvenile idiopathic arthritis (JIA) and, further, to analyze the apparent diffusion coefficient (ADC) levels to distinguish synovium from effusion. Standard magnetic resonance imaging of the knee including post-contrast imaging was obtained in eight patients (mean age, 12 years 8 months, five females) using an open-bore magnetic resonance imaging system (1.0 T). In addition, axially acquired echo-planar DWI datasets (b-values 0, 50, and 600) were prospectively obtained and the diffusion images were post-processed into ADC{sub 50-600} maps. Two independent observers selected a region of interest (ROI) for both synovium and effusion using aligned post-contrast images as landmarks. Mann-Whitney U test was performed to compare ADC synovium and ADC effusion. DWI was successfully obtained in all patients. When data of both observers was combined, ADC synovium was lower than ADC effusion in the ROI in seven out of eight patients (median, 1.92 x 10{sup -3} mm{sup 2}/s vs. 2.40 x 10{sup -3} mm{sup 2}/s, p = 0.006, respectively). Similar results were obtained when the two observers were analyzed separately (observer 1: p = 0.006, observer 2: p = 0.04). In this pilot study, on a patient-friendly 1.0-T open-bore MRI, we demonstrated that DWI may potentially be a feasible non-invasive imaging technique in children with JIA. We could differentiate synovium from effusion in seven out of eight patients based on the ADC of synovium and effusion. However, to select synovium and effusion on DWI, post-contrast images were still a necessity. (orig.)

  11. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  12. Efficacy and safety in performing of large bore percutaneous nephrostomy under ultrasound guidance

    International Nuclear Information System (INIS)

    Smilov, N.; Mlachkova, D.; Rizov, A.; Lozev, I.

    2009-01-01

    The aim of the study was to compare the success rate, complications and the outcomes from large-bore percutaneous nephrostomy under ultrasound guidance performed to 178 cases with another 54 when nephrostomy under x-ray control was performed. We have performed 178 large-bore percutaneous nephrostomy under ultrasound guidance and another 54 percutaneous nephrostomy under x-ray guidance to patients diagnosed with obstructive uropathy resulting from benign or malignant supravesical obstruction. We have performed successful nephrostomy in 93,8% of the cases under ultrasound guidance and 100% successful nephrostomy in the cases under x-ray control. In 2,8% of patients under ultrasound guidance the nephrostomy was performed using 4 additional punctures of the pyelocaliceal system and artificially caused hydronephrosis via infiltration of normal saline; and in the remaining 1,7% it was successful at the second attempt after 24 hours. It was not necessary to perform open surgery nephrostomy in any of the cases. The performance of percutaneous nephrostomy under ultrasound guidance has a success rate similar to the one done under x-ray guidance and with commensurable frequency and severity of complications, however without the patient and the operator being exposed to x-ray radiation. In general, the percutaneous nephrostomy under ultrasound guidance is performed without difficulties in the cases of third or fourth degree hydronephrosis. The lateral decubital patient position, the appropriate place for the puncture, the usage of Color Doppler imaging when the puncture is performed and the continuos ultrasound guidance during dilatation and placement of the nephrostomy tube should ensure the successful performance of the procedure in the case of first or second degree hydronephrosis. When hydronephrosis is absent, the nephrostomy should be performed under x-ray guidance. In emergency cases the application of ultrasound guidance allows the nephrostomy to be performed along the

  13. Osedax borings in fossil marine bird bones

    Science.gov (United States)

    Kiel, Steffen; Kahl, Wolf-Achim; Goedert, James L.

    2011-01-01

    The bone-eating marine annelid Osedax consumes mainly whale bones on the deep-sea floor, but recent colonization experiments with cow bones and molecular age estimates suggesting a possible Cretaceous origin of Osedax indicate that this worm might be able grow on a wider range of substrates. The suggested Cretaceous origin was thought to imply that Osedax could colonize marine reptile or fish bones, but there is currently no evidence that Osedax consumes bones other than those of mammals. We provide the first evidence that Osedax was, and most likely still is, able to consume non-mammalian bones, namely bird bones. Borings resembling those produced by living Osedax were found in bones of early Oligocene marine flightless diving birds (family Plotopteridae). The species that produced these boreholes had a branching filiform root that grew to a length of at least 3 mm, and lived in densities of up to 40 individuals per square centimeter. The inclusion of bird bones into the diet of Osedax has interesting implications for the recent suggestion of a Cretaceous origin of this worm because marine birds have existed continuously since the Cretaceous. Bird bones could have enabled this worm to survive times in the Earth's history when large marine vertebrates other than fish were rare, specifically after the disappearance of large marine reptiles at the end-Cretaceous mass extinction event and before the rise of whales in the Eocene.

  14. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  15. Development of Managing Program for Small Bore Piping Socket Weld on the Secondary System of NPP

    International Nuclear Information System (INIS)

    Lee, Dong Min; Ryu, Jong Myeong; Cho, Hong Seok; Cho, Ki Hyun; Choi, Sang Hoon; Kim, Man Hee

    2011-01-01

    Kori unit 3 had stopped operation due to leakage at steam generator drain line socket weld on June 6th, 2008. The cause of socket weld damage was known as welding defect and fatigue by vibration under normal operation. With above reason, the government has been required developing management program for small bore piping socket weld. Therefore, we have developed the socket weld management program to secure reliability and soundness of socket welds which are located at all domestic NPPs

  16. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  17. Minimal analytical model for undular tidal bore profile; quantum and Hawking effect analogies

    Science.gov (United States)

    Berry, M. V.

    2018-05-01

    Waves travelling up-river, driven by high tides, often consist of a smooth front followed by a series of undulations. A simple approximate theory gives the rigidly travelling profile of such ‘undular hydraulic jumps’, up to scaling, as the integral of the Airy function; applying self-consistency fixes the scaling. The theory combines the standard hydraulic jump with ideas borrowed from quantum physics: Hamiltonian operators and zero-energy eigenfunctions. There is an analogy between undular bores and the Hawking effect in relativity: both concern waves associated with horizons. ‘Physics is not just Concerning the Nature of Things, but Concerning the Interconnectedness of all the Natures of Things’(Sir Charles Frank, retirement speech 1976).

  18. Small bore pipe acceptance criteria for watts bar nuclear plant Tennessee Valley Authority

    International Nuclear Information System (INIS)

    Sun, W.S.; Lee, R.L.; Kalyanan, N.

    1991-01-01

    Small bore pipe (≤2 inches NPS) is traditionally analyzed by simplified techniques using Cook Book approach, which yield conservative results. However, reconciliation of these systems for as-built condition where the original criteria is observed to have been exceeded (or due to additions etc.) generally becomes a time consuming and expensive operation since a rigorous computer aided analysis or a detailed hand calculation becomes necessary. The acceptance criteria in this paper can be effectively used in such cases. The approach involves utilizing basic engineering principles and plant specific parameters (such as earthquake spectra) to estimate the system response such as pipe stress due to various loading conditions, piping frequency, support and anchor loads, valve acceleration etc

  19. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  20. Equipment gift to Monaco

    International Nuclear Information System (INIS)

    1970-01-01

    Research work at the Agency's Laboratory of Marine Radioactivity in Monaco, including that concerned with pollution of the sea, has been made more effective by its latest acquisition of equipment. This is a spectrophotometer donated by the Federal Republic of Germany. (author)

  1. Division of Scientific Equipment - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2002-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: * designs of devices and equipment for experiments in physics; their mechanical construction and assembly. In particular, these are vacuum chambers and installations for HV and UHV;* maintenance and upgrading of the existing installations and equipment in our Institute; * participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and an A0 plotter, which allow us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop offers a wide range of machining and treatment methods with satisfactory tolerances and surface quality. They include: * turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc type elements of a diameter up to 600 mm and a length not exceeding 300 mm, * milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm, * grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm, * drilling - holes of a diameter up to 50 mm, * welding - electrical and gas welding, including TIG vacuum-tight welding, * soft and hard soldering, * mechanical works including precision engineering, * plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides, * painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop is equipped with the CNC milling machine which can be used for machining of work pieces up to 500 kg. The machine

  2. Mechanical (turbines and auxiliary equipment)

    CERN Document Server

    Sherry, A; Cruddace, AE

    2013-01-01

    Modern Power Station Practice, Volume 3: Mechanical (Turbines and Auxiliary Equipment) focuses on the development of turbines and auxiliary equipment used in power stations in Great Britain. Topics covered include thermodynamics and steam turbine theory; turbine auxiliary systems such as lubrication systems, feed water heating systems, and the condenser and cooling water plants. Miscellaneous station services, and pipework in power plants are also described. This book is comprised of five chapters and begins with an overview of thermodynamics and steam turbine theory, paying particular attenti

  3. Personal protective equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This Practical Radiation Technical Manual is one of a series that has been designed to provide guidance on radiological protection for employers, radiation protection officers, managers and other technically competent persons who have responsibility for ensuring the safety of employees working with ionizing radiation. The Manual may be used with the appropriate IAEA Practical Radiation Safety Manuals to provide training, instruction and information for all employees engaged in work with ionizing radiation. Personal protective equipment (PPE) includes clothing or other special equipment that is issued to individual workers to provide protection against actual or potential exposure to ionizing radiations. It is used to protect each worker against the prevailing risk of external or internal exposure in circumstances in which it is not reasonably practicable to provide complete protection by means of engineering controls or administrative methods. Adequate personal protection depends on PPE being correctly selected, fitted and maintained. Appropriate training for the users and arrangements to monitor usage are also necessary to ensure that PPE provides the intended degree of protection effectively. This Manual explains the principal types of PPE, including protective clothing and respiratory protective equipment (RPE). Examples of working procedures are also described to indicate how PPE should be used within a safe system of work. The Manual will be of most benefit if it forms part of a more comprehensive training programme or is supplemented by the advice of a qualified expert in radiation protection. Some of the RPE described in this Manual should be used under the guidance of a qualified expert

  4. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  5. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  6. Electronic equipment for spectrometric data processing

    International Nuclear Information System (INIS)

    Antonov, L.J.; Trenev, A.M.; Todorova, E.I.; Dimitrov, V.D.

    1978-01-01

    Electronic equipment carrying out logical operations and a full set of the arithmetic operations was developed for spectrometric data processing. The flowsheet of the computing part of the device, made on the basis of a specialized integral circuit, is given. The device includes input registers, multiplexor, matrix commutator, arithmetic unit and indication unit. The equipment is rated to carry out calculations according to comparatively complex formulae in several seconds

  7. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  8. Audio-Visual Equipment Depreciation. RDU-75-07.

    Science.gov (United States)

    Drake, Miriam A.; Baker, Martha

    A study was conducted at Purdue University to gather operational and budgetary planning data for the Libraries and Audiovisual Center. The objectives were: (1) to complete a current inventory of equipment including year of purchase, costs, and salvage value; (2) to determine useful life data for general classes of equipment; and (3) to determine…

  9. MRI-Guided Intervention for Breast Lesions Using the Freehand Technique in a 3.0-T Closed-Bore MRI Scanner: Feasibility and Initial Results

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Hye Young [Department of Radiology, Gyeongsang National University Hospital, Jinju 660-702 (Korea, Republic of); Kim, Sun Mi; Jang, Mijung; Yun, Bo La [Department of Radiology, Seoul National University Bundang Hospital, Seongnam 463-707 (Korea, Republic of); Kim, Sung-Won; Kang, Eunyoung [Department of Surgery, Seoul National University Bundang Hospital, Seongnam 463-707 (Korea, Republic of); Park, So Yeon [Department of Pathology, Seoul National University Bundang Hospital, Seongnam 463-707 (Korea, Republic of); Moon, Woo Kyung [Department of Radiology, Seoul National University College of Medicine, Seoul National University Hospital, Seoul 110-744 (Korea, Republic of); Ko, Eun Sook [Department of Radiology, Samsung Medical Center, Seoul 135-710 (Korea, Republic of)

    2013-07-01

    To report the feasibility of magnetic resonance imaging (MRI)-guided intervention for diagnosing suspicious breast lesions detectable by MRI only, using the freehand technique with a 3.0-T closed-bore MRI scanner. Five women with 5 consecutive MRI-only breast lesions underwent MRI-guided intervention: 3 underwent MRI-guided needle localization and 2, MRI-guided vacuum-assisted biopsy. The interventions were performed in a 3.0-T closed-bore MRI system using a dedicated phased-array breast coil with the patients in the prone position; the freehand technique was used. Technical success and histopathologic outcome were analyzed. MRI showed that four lesions were masses (mean size, 11.5 mm; range, 7-18 mm); and 1, a nonmass-like enhancement (maximum diameter, 21 mm). The locations of the lesions with respect to the breast with index cancer were as follows: different quadrant, same breast - 3 cases; same quadrant, same breast - 1 case; and contralateral breast - 1 case. Histopathologic evaluation of the lesions treated with needle localization disclosed perilobular hemangioma, fibrocystic change, and fibroadenomatous change. The lesions treated with vacuum-assisted biopsy demonstrated a radial scar and atypical apocrine hyperplasia. Follow-up MRI after 2-7 months (mean, 4.6 months) confirmed complete lesion removal in all cases. MRI-guided intervention for breast lesions using the freehand technique with a 3.0-T closed-bore MRI scanner is feasible and accurate for diagnosing MRI-only lesions.

  10. MRI-Guided Intervention for Breast Lesions Using the Freehand Technique in a 3.0-T Closed-Bore MRI Scanner: Feasibility and Initial Results

    International Nuclear Information System (INIS)

    Choi, Hye Young; Kim, Sun Mi; Jang, Mijung; Yun, Bo La; Kim, Sung-Won; Kang, Eunyoung; Park, So Yeon; Moon, Woo Kyung; Ko, Eun Sook

    2013-01-01

    To report the feasibility of magnetic resonance imaging (MRI)-guided intervention for diagnosing suspicious breast lesions detectable by MRI only, using the freehand technique with a 3.0-T closed-bore MRI scanner. Five women with 5 consecutive MRI-only breast lesions underwent MRI-guided intervention: 3 underwent MRI-guided needle localization and 2, MRI-guided vacuum-assisted biopsy. The interventions were performed in a 3.0-T closed-bore MRI system using a dedicated phased-array breast coil with the patients in the prone position; the freehand technique was used. Technical success and histopathologic outcome were analyzed. MRI showed that four lesions were masses (mean size, 11.5 mm; range, 7-18 mm); and 1, a nonmass-like enhancement (maximum diameter, 21 mm). The locations of the lesions with respect to the breast with index cancer were as follows: different quadrant, same breast - 3 cases; same quadrant, same breast - 1 case; and contralateral breast - 1 case. Histopathologic evaluation of the lesions treated with needle localization disclosed perilobular hemangioma, fibrocystic change, and fibroadenomatous change. The lesions treated with vacuum-assisted biopsy demonstrated a radial scar and atypical apocrine hyperplasia. Follow-up MRI after 2-7 months (mean, 4.6 months) confirmed complete lesion removal in all cases. MRI-guided intervention for breast lesions using the freehand technique with a 3.0-T closed-bore MRI scanner is feasible and accurate for diagnosing MRI-only lesions

  11. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  12. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  13. Improved Safety and Efficacy of Small-Bore Feeding Tube Confirmation Using an Electromagnetic Placement Device.

    Science.gov (United States)

    Powers, Jan; Luebbehusen, Michael; Aguirre, Lillian; Cluff, Julia; David, Mary Ann; Holly, Vince; Linford, Lorraine; Park, Nancy; Brunelle, Rocco

    2018-04-01

    Early enteral nutrition has been shown to decrease complications and improve patient outcomes. Post pyloric feeding is recommended for patients with gastric intolerance or at high risk for aspiration. Feeding tube placement can be challenging and pose risk of pulmonary complications. Reliance on radiographic confirmation for feeding tube placement exposes the patient to radiation. Electromagnetic placement device (EMPD) may offer a method to minimize pulmonary complications, increase successful placement, and decrease radiation exposure to the patient. The purpose of this study was to evaluate the safety and efficacy of using EMPD verification, instead of routine abdominal radiographic confirmation, for small-bore feeding tube placement. Variables evaluated were adverse events, utilization of radiographs for confirmation, and success rate of feeding tube placement in the ordered location. Two time frames were reviewed. In a 1-year period, 3754 small-bore feeding tubes were placed using EMPD, with zero adverse events noted. Radiographic confirmation was utilized in 0%-29.2% of the EMPD placed tubes. Successful placement of feeding tubes using EMPD ranged from 94%-99.6%. During a 5-year period, 7081 EMPD feeding tubes were evaluated. One adverse event, pneumothorax, occurred during the placement of these 7081 tubes, for a rate of 0.014%. Feeding tube placement confirmation is safe and efficacious via EMPD providing an effective method of feeding tube placement with a success rate >94% into the desired location. EMPD is an accurate verification method of distal tip location, eliminating the need for routine abdominal radiographic confirmation. © 2018 American Society for Parenteral and Enteral Nutrition.

  14. Research of mining and geological conditions for geological exploration in Pre-Caucasian region

    Directory of Open Access Journals (Sweden)

    Р. А. Гасумов

    2017-12-01

    Full Text Available Taking into consideration natural depletion of reserves of hydrocarbons in Mesozoic deposits of the majority of operated deposits of North Caucasus and for the purpose of further development of oil and gas producing industry in the region it is necessary to involve a carbonaceous complex of Jura of West Pre-Caucasus with the burial depth of more than 5300 m in the development. When drafting engineering design for a construction of exploratory wells in complex mining and geological conditions driven by anomalously high overburden pressure and temperature, use of thoroughly studied field geological information and taking into consideration the experience of boring similar wells is important. The paper provides analysis of geophysical data, the results of complex studies of reservoir porosity and permeability features of rocks picked out of core-samples of the first exploratory well on Krupskaya zone (porosity, permeability, electrical, acoustic, lithological characteristics, pressure-and-temperature conditions. The information obtained allowed to specify technological parameters of boring and tailing-in and to give recommendations regarding the way of exploratory wells boring and use of borehole equipment. In order to avoid the development of significant hydrodynamic pressure in the borehole which provokes gas showings it is necessary to keep on a certain level of minimal values of mud rheology parameters (dynamic shear stress τ = 70¸135 dPa; plastic viscosity η = 25¸35 mPa·s. For the purpose of real-time keeping of overbalance with anomalously high overburden pressure, control and regulation of calculated head pressure a stripper head should be included into the equipment configuration. Furthermore well head equipment and blowout preventer equipment must be designed for expected gradient of overburden pressure.

  15. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  16. Strategic planning toolset for reproduction of machinebuilding engines and equipment

    Science.gov (United States)

    Boyko, A. A.; Kukartsev, V. V.; Lobkov, K. Y.; Stupina, A. A.

    2018-05-01

    This article illustrates a replica of a dynamic model of machine-building equipment. The model was designed on the basis of a ‘system dynamics method’ including the Powersim Studio toolset. The given model provides the basis and delineates the reproduction process of equipment in its natural as well as appraisal forms. The presented model was employed as a tool to explore reproduction of a wide range of engines and equipment in machine-building industry. As a result of these experiments, a variety of reproducible options were revealed which include productive capacity and distribution of equipment among technology groups. The authors’ research concludes that the replica of the dynamic model designed by us has proved to be universal. This also opens the way for further research exploring a wide range of industrial equipment reproduction.

  17. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  18. Safety Review related to Commercial Grade Digital Equipment in Safety System

    International Nuclear Information System (INIS)

    Yu, Yeongjin; Park, Hyunshin; Yu, Yeongjin; Lee, Jaeheung

    2013-01-01

    The upgrades or replacement of I and C systems on safety system typically involve digital equipment developed in accordance with non-nuclear standards. However, the use of commercial grade digital equipment could include the vulnerability for software common-mode failure, electromagnetic interference and unanticipated problems. Although guidelines and standards for dedication methods of commercial grade digital equipment are provided, there are some difficulties to apply the methods to commercial grade digital equipment for safety system. This paper focuses on regulatory guidelines and relevant documents for commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. This paper focuses on KINS regulatory guides and relevant documents for dedication of commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. Dedication including critical characteristics is required to use the commercial grade digital equipment on safety system in accordance with KEPIC ENB 6370 and EPRI TR-106439. The dedication process should be controlled in a configuration management process. Appropriate methods, criteria and evaluation result should be provided to verify acceptability of the commercial digital equipment used for safety function

  19. Persistence motives in irrational decisions to complete a boring task.

    Science.gov (United States)

    Halkjelsvik, Torleif; Rise, Jostein

    2015-01-01

    We explored a novel task paradigm where participants from the online work marketplace Amazon Mechanical Turk were given the choice to quit or continue an unfinished boring task for identical economic rewards. In Studies 1a and 1b, about half the participants chose to continue (corresponding to an average of 55 and 35 cents in foregone earnings). Participants' self-reported reasons for continuing involved various types of persistence motives, reflecting a desire to persist or complete per se. Studies 2, 3a, 3b, and 3c ruled out the possibility that people continued because they enjoyed the task or believed there were additional rewards for continuing. Study 4 showed that the choice to quit/continue was associated with the manner in which the choice was presented (persistence test vs. decision-making test) and individual differences in dispositional persistence motives. The present data indicate that motivational forces independent of the focal reward may affect intertemporal decisions. © 2014 by the Society for Personality and Social Psychology, Inc.

  20. Development of ion/proton beam equipment for industrial uses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Byung Ho; Lee, J. H.; Cho, Y. S.; Joo, P. K.; Kang, S. S.; Song, W. S.; Kim, H. J.; Chang, G. H.; Bang, S. W

    1999-12-01

    KAERI has possessed design and fabrication technologies of various ion sources including Duoplasmatron and DuoPiGatron developed by R and D projects of the long-term nuclear technology development program. In order to industrialize ion beam equipments utilizing these ion sources, a technology transfer project for a technology transfer project for a domestic firm has been performed. Under this project, engineers of the firm have been trained through classroom lectures of ion beam principles and OJT, an ion/proton beam equipment (DEMO equipment) has been designed, assembled and commissioned jointly with the engineers. Quality of the ion sources has been quantified, and technologies for ion beam equipment construction, functional test and application research have been developed. The DEMO equipment, which consists of an ion source, power supplies, vacuum, cooling and target systems, has been fabricated and tested to secure stability and reliability for industrial uses. Various characteristic tests including high voltage insulation, beam extraction, beam current measuring, etc. have been performed. This DEMO can be utilized for ion sources development as well as ion beam process development for various industrial products. Engineers of the firm have been trained for the industrialization of ion beam equipment and joined in beam application technology development to create industrial needs of beam equipment. (author)

  1. 33 CFR 150.15 - What must the operations manual include?

    Science.gov (United States)

    2010-07-01

    ... containment; (iii) Connecting and disconnecting transfer equipment, including a floating hose string for a...) Connecting and disconnecting of transfer equipment, including to a floating hose string for a SPM; (iv) Line..., bolted flanges, and quick-disconnect coupling. (10) A description of the method used to water and de...

  2. A new-generation asymmetric multi-bore hollow fiber membrane for sustainable water production via vacuum membrane distillation.

    Science.gov (United States)

    Wang, Peng; Chung, Tai-Shung

    2013-06-18

    Due to the growing demand for potable water, the capacities for wastewater reclamation and saline water desalination have been increasing. More concerns are raised on the poor efficiency of removing certain contaminants by the current water purification technologies. Recent studies demonstrated superior separation performance of the vacuum membrane distillation (VMD) technology for the rejection of trace contaminants such as boron, dye, endocrine-disruptive chemical, and chloro-compound. However, the absence of suitable membranes with excellent wetting resistance and high permeation flux has severely hindered the VMD application as an effective water production process. This work presents a new generation multibore hollow fiber (MBF) membrane with excellent mechanical durability developed for VMD. Its micromorphology was uniquely designed with a tight surface and a fully porous matrix to maximize both high wetting resistance and permeation flux. Credit to the multibore configuration, a 65% improvement was obtained on the antiwetting property. Using a synthetic seawater feed, the new membrane with optimized fabrication condition exhibits a high flux and the salt rejection is consistently greater than 99.99%. In addition, a comparison of 7-bore and 6-bore MBF membranes was performed to investigate the optimum geometry design. The newly designed MBF membrane not only demonstrates its suitability for VMD but also makes VMD come true as an efficient process for water production.

  3. Seismic Design of a Single Bored Tunnel: Longitudinal Deformations and Seismic Joints

    Science.gov (United States)

    Oh, J.; Moon, T.

    2018-03-01

    The large diameter bored tunnel passing through rock and alluvial deposits subjected to seismic loading is analyzed for estimating longitudinal deformations and member forces on the segmental tunnel liners. The project site has challenges including high hydrostatic pressure, variable ground profile and high seismic loading. To ensure the safety of segmental tunnel liner from the seismic demands, the performance-based two-level design earthquake approach, Functional Evaluation Earthquake and Safety Evaluation Earthquake, has been adopted. The longitudinal tunnel and ground response seismic analyses are performed using a three-dimensional quasi-static linear elastic and nonlinear elastic discrete beam-spring elements to represent segmental liner and ground spring, respectively. Three components (longitudinal, transverse and vertical) of free-field ground displacement-time histories evaluated from site response analyses considering wave passage effects have been applied at the end support of the strain-compatible ground springs. The result of the longitudinal seismic analyses suggests that seismic joint for the mitigation measure requiring the design deflection capacity of 5-7.5 cm is to be furnished at the transition zone between hard and soft ground condition where the maximum member forces on the segmental liner (i.e., axial, shear forces and bending moments) are induced. The paper illustrates how detailed numerical analyses can be practically applied to evaluate the axial and curvature deformations along the tunnel alignment under difficult ground conditions and to provide the seismic joints at proper locations to effectively reduce the seismic demands below the allowable levels.

  4. Scientific Equipment Division - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2001-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: - designing of devices and equipment for experiments in physics, their mechanical construction and assembly. In particular, there are vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and a AO plotter, what allows us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. It offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fred drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop posses CNC milling machine which can be used for machining of work-pieces up to 500 kg

  5. 18 CFR 367.57 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... piers and foundations that are designed to be as permanent as the buildings that house the equipment, or... walls, ceilings or floors or without in some way impairing the building, must be included in the...

  6. An in vivo wide bore NMR spectrometer at 2 T for human metabolic studies

    International Nuclear Information System (INIS)

    Tran Dinh, S.; Jehenson, P.; Chalot, J.F.

    1985-01-01

    A wide bore (53 cm diameter) superconducting magnet operating at 2 T was built by the Service des Techniques Instrumentales des Particules Elementaires at C.E.N.-Saclay (Institut de Recherche Fondamentale of the Commissariat a l'Energie Atomique) for NMR spectroscopic studies in humans. The magnet consists of two main components: a magnetic circuit and a cryostat. The magnetic circuit is made of a main coil (four solenoids with 23 km of niobium-titanium superconductor) and its superconducting shim coils (correcting for nine terms: Z, Z 2 , Z 3 , X, Y, XY, XZ, YZ, X 2 -Y 2 ). The current in the main coil is 200 A and the maximum current in each shim coil is 20A. The magnetic field homogeneity is about 4.10 -8 in a 20 mm diameter sphere and its time drift is less than 10 -8 /hour. The whole NMR spectrometer, including the superconducting magnet and a Bruker CXP-90 console associated with an Aspect 2000 calculator was recently installed in the Service Hospitalier Frederic-Joliot, Biology Department of the C.E.A. Preliminary results obtained by 31 P-NMR in humans using surface coils of various diameters (3,5 and 10 cm) are also presented [fr

  7. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  8. Simultaneous in-bore rail and insulator spectra from a railgun plasma armature

    International Nuclear Information System (INIS)

    Keefer, D.; Sedghinasah, A.; Crawford, R.

    1991-01-01

    This paper reports on absolute spectral radiance measurements obtained simultaneously at the rail and insulator surface of the UTSI 1 cm square-bore railgun. The emission spectra were obtained through the use of quartz optical fibers which penetrated both the rail and the insulator walls. The spectral characteristics of the rail and insulator emission are quite similar but differ significantly in magnitude. A detailed plasma radiation model was used to analyze these spectra. In order to obtain reasonable agreement between the model predictions and the experimental spectra, it was necessary to assume that these existed a broadband absorbing layer at the insulator surface. This result suggests a new physical model of the plasma armature in which insulator ablation leads to significant 3-dimensional flow and affects the shape of the current emission pattern on the rail surfaces

  9. Numerical simulation of two-phase filtration in the near well bore zone

    Science.gov (United States)

    Maksat, Kalimoldayev; Kalipa, Kuspanova; Kulyash, Baisalbayeva; Orken, Mamyrbayev; Assel, Abdildayeva

    2018-04-01

    On the basis of the fundamental laws of energy conservation, nonstationary processes of filtration of two-phase liquids in multilayered reservoirs in the near well bore zone are considered. Number of reservoirs, fluid pressure in the given reservoirs, reservoir permeability, oil viscosity, etc. are taken into account upon that. Plane-parallel flow and axisymmetric cases have been studied. In the numerical solution, non-structured meshes are used. Closer to the well, the meshes thicken. The integration step over time is defined by the generalized Courant inequality. As a result, there are no large oscillations in the numerical solutions obtained. Oil production rates, Poisson's ratios, D-diameters of the well, filter height, filter permeability, and cumulative thickness of the filter cake and the area have been taken as the main inputs in numerical simulation of non-stationary processes of two-phase filtration.

  10. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  11. Electronically rotated and translated field-free line generation for open bore magnetic particle imaging.

    Science.gov (United States)

    Top, Can Barış; Ilbey, Serhat; Güven, Hüseyin Emre

    2017-12-01

    We propose a coil arrangement for open bore field-free line (FFL) magnetic particle imaging (MPI) system, which is suitable for accessing the subject from the sides. The purpose of this study is twofold, to show that the FFL can be rotated and translated electronically in a volume of interest with this arrangement and to analyze the current, voltage and power requirements for a 1 T/m gradient human sized scanner for a 200 mm diameter × 200 mm height cylindrical field of view (FOV). We used split coils side by side with alternating current directions to generate a field-free line. Employing two of these coil groups, one of which is rotated 90 degrees with respect to the other, a rotating FFL was generated. We conducted numerical simulations to show the feasibility of this arrangement for three-dimensional (3D) electronical scan of the FFL. Using simulations, we obtained images of a two-dimensional (2D) in silico dot phantom for a human size scanner with system matrix-based reconstruction. Simulations showed that the FFL can be generated and rotated in one plane and can be translated in two axes, allowing for 3D imaging of a large subject with the proposed arrangement. Human sized scanner required 63-215 kW power for the selection field coils to scan the focus inside the FOV. The proposed setup is suitable for FFL MPI imaging with an open bore configuration without the need for mechanical rotation, which is preferable for clinical usage in terms of imaging time and patient access. Further studies are necessary to determine the limitations imposed by peripheral nerve stimulation, and to optimize the system parameters and the sequence design. © 2017 American Association of Physicists in Medicine.

  12. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  13. Performance of Small Bore 60NiTi Hybrid Ball Bearings: Preliminary Life Test Results

    Science.gov (United States)

    Dellacorte, Christopher; Howard, S. Adam

    2016-01-01

    Small bore (R8 size) hybrid ball bearings made with 60NiTi races and silicon nitride balls are under development for highly corrosive aerospace applications that are also exposed to heavy static (shock) loads. The target application is the vacuum pump used inside the wastewater recycling system on the International Space Station. To verify bearing longevity, life tests are run at 2000rpm for time periods up to 5000 hours. Accelerometers with data tracking are used to monitor operation and the bearings are disassembled and inspected at intervals to assess wear. Preliminary tests show that bearings made from 60NiTi are feasible for this aerospace and potentially other industrial applications that must endure similar operating environments.

  14. Contact Dermatitis to Personal Sporting Equipment in Youth.

    Science.gov (United States)

    Marzario, Barbara; Burrows, Dianne; Skotnicki, Sandy

    2016-07-01

    Contact dermatitis to personal sporting equipment in youth is poorly studied. To review the results of patch testing 6 youth to their sporting equipment in a dermatology general private practice from 2006 to 2011. A retrospective analysis of 6 youth aged 11 to 14 who were evaluated for chronic and persistent dermatitis occurring in relation to sports equipment was conducted. All patients were subjected to epicutaneous (patch) testing, which included some or all of the following: North American Contact Dermatitis Group (NACGD) series, textile series, rubber series, corticosteroid series, and raw material from the patients' own personal equipment. All cases had 1 or more positive patch test reactions to an allergen within the aforementioned series, and 3 subjects tested positive to their personal equipment in raw form. Allergic contact dermatitis, not irritant, was deemed the relevant cause of chronic dermatitis in 4 of the 6 patients due to positive reactions to epicutaneous tests and/or personal equipment. The utility of testing to patients' own sporting equipment was shown to be of additional value and should be considered when patch testing for contact allergy to sporting equipment. © The Author(s) 2015.

  15. Method and equipment for treating waste water resulting from the technological testing processes of NPP equipment

    International Nuclear Information System (INIS)

    Radulescu, M. C.; Valeca, S.; Iorga, C.

    2016-01-01

    Modern methods and technologies coupled together with advanced equipment for treating residual substances resulted from technological processes are mandatory measures for all industrial facilities. The correct management of the used working agents and of the all wastes resulted from the different technological process (preparation, use, collection, neutralization, discharge) is intended to reduce up to removal of their potential negative impact on the environment. The high pressure and temperature testing stands from INR intended for functional testing of nuclear components (fuel bundles, fuelling machines, etc.) were included in these measures since the use of oils, demineralized water chemically treated, greases, etc. This paper is focused on the method and equipment used at INR Pitesti in the chemical treatment of demineralized waters, as well as the equipment for collecting, neutralizing and discharging them after use. (authors)

  16. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  17. Bionic design methodology for wear reduction of bulk solids handling equipment

    NARCIS (Netherlands)

    Chen, G.; Schott, D.L.; Lodewijks, G.

    2016-01-01

    Large-scale handling of particulate solids can cause severe wear on bulk solids handling equipment surfaces. Wear reduces equipment life span and increases maintenance cost. Examples of traditional methods to reduce wear of bulk solids handling equipment include optimizing transport operations

  18. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  19. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  20. Production of the heat exchanger tubes, which will cool down the LHC magnets, and of the cold bore tubes, in which the proton beams will circulate, is due to be completed around the end of 2004. These essential components of the LHC magnets are receiving their finishing touches at CERN : cold bore tubes

    CERN Multimedia

    Maximilien Brice

    2003-01-01

    Insulation of the cold bore tubes in which the LHC beams will circulate takes place in Building 927. In the background, Bruno Meunier checks the wrapping machine while, in the foreground, Olivier Vasseur removes the polyester wrapping that covers the tube's insulating layers.

  1. Application of a gradient diffusion and dissipation time scale ratio model for prediction of mean and fluctuating temperature fields in liquid sodium downstream of a multi-bore jet block

    International Nuclear Information System (INIS)

    Bremhorst, K.; Listijono, J.B.H.; Krebs, L.; Mueller, U.

    1989-01-01

    A previously developed diffusivity based based model, for the prediction of mean and fluctuating temperatures in water flow downstream of a multi-bore jet block in which one jet is heated, is applied to a flow of sodium in apparatus of similar geometry. Some measurements not readily possible in sodium or water flows for this geometry are made using air in order to verify assumptions used in the model. The earlier derived mathematical model is modified to remove assumptions relating to turbulence. Reynolds number and turbulence Peclet number in the relationship between velocity and temperature microscales. Spalding's model, relating fluctuating velocity and temperature dissipation rates, is tested. A significant effect on this relationship due to the low Prandtl number of liquid sodium is identified. Measurements performed behind a multi-bore jet block with air as the working fluid have verified the non-isotropic nature of the large-scale flow. Results clearly show that measurements performed in water can be transferred to liquid sodium provided that molecular diffusion is included in the mean temperature equation, allowance is made for the Prandtl number effect on the dissipation time scale ratio and the coefficient of gradient diffusion of mean square temperature fluctuations is assumed equal to the eddy diffusivity of heat. (author)

  2. Eddy current and quench loads and stress of SSC collider 4-K liner and the bore tube during magnet quench

    International Nuclear Information System (INIS)

    Leung, K.K.; Shu, Q.S.

    1993-07-01

    This paper describes the response of the eddy current and quench loads on a proposed Superconducting SuperCollider 4-K liner system. The liner within a bore tube is designed to remove the radiated power and the photodesorbed gas that impair the beam tube vacuum. The bimetallic liner tube is subjected to cooldown and eddy current loads. The square liner tube is a two-shell laminated Nitronic-40 steel is used for strength and a copper inner layer for low impedance to the image currents. Perforated holes are used to remove the photodesorbed gases for vacuum maintenance. The holes are located in a low-stress area of the liner. Rectangular holes in a four-pole symmetry pattern are required for beam dynamic stability. The liner is conductivity cooled by the round steel bore tube with a 2-mm wall. The copper layer must not be stressed over the yield strength limit because copper properties such as conductivity are known to change when the copper is stressed over yield strength. This analysis will address liner system response under thermal, eddy current, and vaporized liquid helium loads in a quenching dipole magnet

  3. Large superconducting coil fabrication development

    International Nuclear Information System (INIS)

    Brown, R.L.; Allred, E.L.; Anderson, W.C.; Burn, P.B.; Deaderick, R.I.; Henderson, G.M.; Marguerat, E.F.

    1975-01-01

    Toroidal fields for some fusion devices will be produced by an array of large superconducting coils. Their size, space limitation, and field requirements dictate that they be high performance coils. Once installed, accessibility for maintenance and repairs is severely restricted; therefore, good reliability is an obvious necessity. Sufficient coil fabrication will be undertaken to develop and test methods that are reliable, fast, and economical. Industrial participation will be encouraged from the outset to insure smooth transition from development phases to production phases. Initially, practice equipment for three meter bore circular coils will be developed. Oval shape coil forms will be included in the practice facility later. Equipment that is more automated will be developed with the expectation of winding faster and obtaining good coil quality. Alternate types of coil construction, methods of winding and insulating, will be investigated. Handling and assembly problems will be studied. All technology developed must be feasible for scaling up when much larger coils are needed. Experimental power reactors may need coils having six meter or larger bores

  4. Development of small-bore, high-current-density railgun as testbed for study of plasma-materials interaction. Progress report for October 16, 2000 - May 13, 2003

    International Nuclear Information System (INIS)

    Kyekyoon, Kim-Kevin

    2003-01-01

    The present document is a final technical report summarizing the progress made during 10/16/2000 - 05/13/2003 toward the development of a small-bore railgun with transaugmentation as a testbed for investigating plasma-materials interaction

  5. Model of a 80 K liner vacuum system for the 4.2 K cold bore of the SSCL 20 TeV proton collider

    International Nuclear Information System (INIS)

    Turner, W.

    1993-09-01

    In this paper we discuss a model for an 80 K liner system for the beam tube vacuum of the Superconducting Super Collider (SSC). The liner is a coaxial perforated tube fitting inside the ∼4.2 K bore tube of the SSC magnet cryostats. A liner of this type is useful for pumping the gas desorbed by synchrotron radiation out of the view of the radiation and for decoupling the beam current from the 4.2 K refrigeration plant capacity. Addition of cryosorber on the bore tube (e.g., charcoal) greatly increases the H 2 sorption capacity compared to the bare metal surface, thus lengthening the time between beam tube warmups. The model equations are useful for estimating the performance of the beam tube vacuum and for defining the experimental information necessary to make a prediction. Some analysis is also presented for 4.2 K and 20 K liners and a simple 4.2 K beam tube without a liner

  6. Consolidation equipment for irradiated nuclear fuel channels

    International Nuclear Information System (INIS)

    Taguchi, M.; Komatsu, Y.; Ose, T.

    1989-01-01

    The authors have developed and put into use a new type of mechanical consolidation equipment for irradiated nuclear fuel channels. This includes round-slice cutting of the top 100mm of the fuel channel with a guillotine cutter, and press cutting of the two corners of the remaining length of the fuel channel. Four guillotine blades work in combination with receiving blades arranged inside the fuel channel to cut the top 100mm, including the clips and spacers, of the fuel channel into a round slice. A press assembled in the consolidation equipment then presses the slice to achieve volume reduction. The press cutting operation uses two press cutting blades arranged inside the fuel channel and the receiving blades outside the fuel channel. The remaining length of fuel channel is cut off into L-shaped pieces by press cutting. This consolidation equipment is highly efficient because the round-slice cutting, pressing, and press cutting are all achieved by one unit

  7. Evaluación de tres dietas con harina de hoja de bore (Alocasia macrorrhiza en pollos de engorde

    Directory of Open Access Journals (Sweden)

    Fredy López M.

    2012-12-01

    Full Text Available Objetivo. Evaluar el efecto nutricional de incluir la harina de hoja de bore, en proporciones de 0 (T1, 5 (T2, 10 (T3 y 15% (T4, en la alimentación de 100 pollos machos de la línea Ross 308. Materiales y Métodos. Se empleo un diseño experimental completamente al azar con cuatro tratamientos, cinco repeticiones por tratamiento y cinco unidades experimentales por repetición. Para su respectivo análisis se registró consumo diario, ganancia de peso, conversión alimenticia, mortalidad y eficiencia económica, durante un periodo de 6 semanas. Resultados. Se observó que no existieron diferencias estadísticas significativas en conversión alimenticia, pero si en consumo, ganancia de peso y eficiencia económica (p< 0.05, siendo el mejor tratamiento el T2, con un consumo de 4003.4 g, una ganancia de peso de 1794.4g una conversión de 2.4 y un beneficio neto de campo de 107.88%. Conclusiones. La harina de hoja de bore es una alternativa de alimentación para pollos de engorde, al emplearla al 5% de nivel de inclusión, como materia prima no convencional, la cual permite generar un buen comportamiento productivo y económico.

  8. Simple method for the generation of multiple homogeneous field volumes inside the bore of superconducting magnets.

    Science.gov (United States)

    Chou, Ching-Yu; Ferrage, Fabien; Aubert, Guy; Sakellariou, Dimitris

    2015-07-17

    Standard Magnetic Resonance magnets produce a single homogeneous field volume, where the analysis is performed. Nonetheless, several modern applications could benefit from the generation of multiple homogeneous field volumes along the axis and inside the bore of the magnet. In this communication, we propose a straightforward method using a combination of ring structures of permanent magnets in order to cancel the gradient of the stray field in a series of distinct volumes. These concepts were demonstrated numerically on an experimentally measured magnetic field profile. We discuss advantages and limitations of our method and present the key steps required for an experimental validation.

  9. Conventional and narrow bore short capillary columns with cyclodextrin derivatives as chiral selectors to speed-up enantioselective gas chromatography and enantioselective gas chromatography-mass spectrometry analyses.

    Science.gov (United States)

    Bicchi, Carlo; Liberto, Erica; Cagliero, Cecilia; Cordero, Chiara; Sgorbini, Barbara; Rubiolo, Patrizia

    2008-11-28

    The analysis of complex real-world samples of vegetable origin requires rapid and accurate routine methods, enabling laboratories to increase sample throughput and productivity while reducing analysis costs. This study examines shortening enantioselective-GC (ES-GC) analysis time following the approaches used in fast GC. ES-GC separations are due to a weak enantiomer-CD host-guest interaction and the separation is thermodynamically driven and strongly influenced by temperature. As a consequence, fast temperature rates can interfere with enantiomeric discrimination; thus the use of short and/or narrow bore columns is a possible approach to speeding-up ES-GC analyses. The performance of ES-GC with a conventional inner diameter (I.D.) column (25 m length x 0.25 mm I.D., 0.15 microm and 0.25 microm d(f)) coated with 30% of 2,3-di-O-ethyl-6-O-tert-butyldimethylsilyl-beta-cyclodextrin in PS-086 is compared to those of conventional I.D. short column (5m length x 0.25 mm I.D., 0.15 microm d(f)) and of different length narrow bore columns (1, 2, 5 and 10 m long x 0.10 mm I.D., 0.10 microm d(f)) in analysing racemate standards of pesticides and in the flavour and fragrance field and real-world-samples. Short conventional I.D. columns gave shorter analysis time and comparable or lower resolutions with the racemate standards, depending mainly on analyte volatility. Narrow-bore columns were tested under different analysis conditions; they provided shorter analysis time and resolutions comparable to those of conventional I.D. ES columns. The narrow-bore columns offering the most effective compromise between separation efficiency and analysis time are the 5 and 2m columns; in combination with mass spectrometry as detector, applied to lavender and bergamot essential oil analyses, these reduced analysis time by a factor of at least three while separation of chiral markers remained unaltered.

  10. 49 CFR 374.313 - Equipment.

    Science.gov (United States)

    2010-10-01

    .... Each bus (except in commuter service) seating more than 14 passengers (not including the driver) shall..., DEPARTMENT OF TRANSPORTATION FEDERAL MOTOR CARRIER SAFETY REGULATIONS PASSENGER CARRIER REGULATIONS Adequacy of Intercity Motor Common Carrier Passenger Service § 374.313 Equipment. (a) Temperature control. A...

  11. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  12. US8,994,532 "Data Center Equipment Location and Monitoring System"

    DEFF Research Database (Denmark)

    2014-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database. The software application program...

  13. Diagnostic Evaluation of the Knee in the Office Setting Using Small-Bore Needle Arthroscopy.

    Science.gov (United States)

    Patel, Karan A; Hartigan, David E; Makovicka, Justin L; Dulle, Donald L; Chhabra, Anikar

    2018-01-01

    Arthroscopy is currently the gold standard for diagnosing intra-articular knee pathology. Magnetic resonance imaging (MRI) can be a clinical adjunct for diagnosis; however, it is not without its shortcomings. Although highly accurate, even advanced imaging misdiagnoses the condition in 1 in 14 patients with regard to anterior cruciate ligament pathology. Previous studies have indicated that MRI fails to identify meniscal pathology when one exists in 1 of every 10 cases, and diagnoses pathology when pathology truly does not exist in 1 of every 5 patients. In-office arthroscopy offers an alternative to formal diagnostic arthroscopy, with reduced cost and risk of complications. This is a technique article that discusses the use of small-bore needle arthroscopy in the office setting.

  14. 21 CFR 226.30 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contamination, including cross-contamination from manufacturing operations. (d) Be suitably grounded... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment. 226.30 Section 226.30 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS: GENERAL...

  15. [Legionella pneumonia after the use of CPAP equipment].

    Science.gov (United States)

    Stolk, Jaap M; Russcher, Anne; van Elzakker, Erika P M; Schippers, Emile F

    2016-01-01

    Continuous positive airway pressure (CPAP) equipment can be colonised by Legionellae and might cause Legionella pneumonia in the user. However, there is no reported case of Legionella pneumonia related to CPAP equipment in which an identical Legionella was found in both the patient and the CPAP equipment. A 51-year-old man came to the Emergency Department with fever, confusion and dyspnoea that had been present for 3 days. His medical history included obstructive sleep apnoea, for which he had been using CPAP therapy at home for 10 weeks. The CPAP equipment showed signs of poor maintenance. Chest X-ray revealed a pulmonary consolidation. Laboratory investigation resulted in a positive urine antigen test for Legionella. Water from the CPAP equipment and sputum from the patient revealed Legionella pneumophila. Serotyping and sequence-based typing showed an identical L. pneumophila serotype 1 ST37. It is important to be aware that CPAP equipment can be colonised with Legionellae and might cause Legionella pneumonia. It is therefore necessary to ask about CPAP therapy in a patient with community-acquired pneumonia.

  16. Incidence of bark- and wood-boring insects in firewood: a survey at Michigan's Mackinac Bridge.

    Science.gov (United States)

    Haack, Robert A; Petrice, Toby R; Wiedenhoeft, Alex C

    2010-10-01

    Firewood is a major pathway for the inadvertent movement of bark- and wood-infesting insects. After discovery of Agrilus planipennis Fairmaire (Coleoptera: Buprestidae) in southeastern Michigan in 2002, quarantines were enacted including prohibition of transporting firewood across the Mackinac Bridge between Michigan's Lower and Upper peninsulas. Drivers are required to surrender firewood before crossing the bridge. We surveyed recently surrendered firewood in April, July, and September 2008 and categorized it by genus, cross-sectional shape (whole, half, or quarter), approximate age (years since it was a live tree), presence of bark, and evidence of bark- and wood-boring insects. The 1045 pieces of firewood examined represented 21 tree genera: primarily Acer (30%), Quercus (18%), Fraxinus (15%), Ulmus (12%), Betula (5%), and Prunus (5%). Live borers (Bostrichoidea, Brentidae, Buprestidae, Cerambycidae, Cossidae, Curculionidae [Scolytinae and non-Scolytinae], and Siricidae) were found in 23% of the pieces and another 41% had evidence of previous borer infestation. Of the 152 Fraxinus firewood pieces, 13% had evidence of past A. planipennis infestation, but we found no live A. planipennis. We discuss national "don't move firewood" campaigns and U.S. imports of fuelwood. During 1996-2009, the United States imported fuelwood valued at > dollars U.S. 98 million from 34 countries.

  17. Restoration to serviceability of Bruce 'A' heat transfer equipment

    International Nuclear Information System (INIS)

    Gammage, D.; Machowski, C.; McGillivray, R.; Durance, D.; Kazimer, D.; Werner, K.

    2009-01-01

    Bruce Units 1 to 4 were shut down during the 1990s by the former Ontario Hydro, due in part to a long list of system and equipment deficiencies and concerns, including steam generator tube degradation as a consequence of the then-existing steam generator secondary side water chemistry conditions. Upon its creation in 2001, and following a program of condition assessment, Bruce Power was able to determine that Units 3 and 4 could return to service; but that Units 1 and 2 would require refurbishment. That Refurbishment Program, which is currently well advanced, included the re-assessment of the condition of equipment throughout the plant including the heat transfer equipment; and determination item-by-item as to what inspection, cleaning, repair, or even replacement would be required to put the equipment into a condition where it could be expected to operate reliably for the additional 30 years expected from the plant. Clearly the objective is to suitably restore the equipment to serviceability without doing more refurbishment work than is warranted - without replacing equipment except where absolutely necessary. The first task in such a program is determination of its scope - i.e. a listing of all heat exchangers. That list included everything from the steam generators (which required replacement, now completed), to much smaller heat exchangers in the heavy water upgrader systems (which were found to be in very good overall condition). There is also a very large number of other so-called 'balance-of-plant' heat exchangers; these include the maintenance coolers, moderator heat exchangers, shutdown coolers and a whole raft of smaller coolers - many of which are cooled directly by lake water with its potential for bio-fouling and 'BIC' (Biologically Induced Corrosion). This paper focuses primarily on the engineering assessment, inspection, repair and general refurbishment of the balance-of-plant heat exchangers. As will be discussed in the paper, the assessment of the

  18. Test with different stress measurement methods in two orthogonal bore holes in Aespoe HRL

    Energy Technology Data Exchange (ETDEWEB)

    Janson, Thomas; Stigsson, Martin [Golder Associates AB, Stockholm (Sweden)

    2002-12-01

    Within the scope of work, to provide the necessary rock mechanics support for the site investigations, SKB has studied some available pieces of equipment for in situ stress measurements in deep boreholes. A project with the objective to compare three different pieces of equipment for in situ stress measurements under similar conditions has been carried out. The main objective for the project is to compare the three different pieces of equipment for in situ stress measurements and find a strategy for SKB's Site Investigations to determine the state of stress in the rock mass. Two units of equipment use the overcoring method while the third uses the hydraulic fracturing method. The overcoring was performed by AECL, using Deep Door stopper Gauge System (DDGS), and SwedPower, using their triaxial strain measuring instrument (Borre Probe). MeSy Geo Systeme GmbH performed the hydraulic fracturing. The DDGS system is a new method to SKB while the experience of the SwedPower overcoring and the hydraulic fracturing methods are long. The tests were performed in the same orthogonal boreholes at Aespoe Hard Rock Laboratory (HRL), Oskarshamn, Sweden. The measured results have been verified against known conditions at the Aespoe HRL. The results from the three in situ stress measurement methods rose more questions than answers. Which illustrate the complexity to determine the in situ stresses in a rock mass. To understand the difference in results and answer the questions, it was necessary to do deeper investigations such as laboratory tests and theoretical calculations such as geological structure model, analysis of the influence of a nearby fracture, P-wave measurements, uniaxial tests on small cores from the HQ-3 core, theoretical and numerical analyses of the hole bottom (theoretical strains, stress concentrations and microcracking), auditing of DDGS measurements results and assumptions in the DDGS analyse and microscopy investigations on the cores. The following

  19. Thermal properties of a large-bore cryocooled 10 T superconducting magnet for a hybrid magnet

    International Nuclear Information System (INIS)

    Ishizuka, M.; Hamajima, T.; Itou, T.; Sakuraba, J.; Nishijima, G.; Awaji, S.; Watanabe, K.

    2010-01-01

    A cryocooled 10 T superconducting magnet with a 360 mm room temperature bore has been developed for a hybrid magnet. The superconducting magnet cooled by four Gifford-McMahon cryocoolers has been designed to generate a magnetic field of 10 T. Since superconducting wires composed of coils were subjected to large hoop stress over 150 MPa and Nb 3 Sn superconducting wires particularly showed a low mechanical strength due to those brittle property, Nb 3 Sn wires strengthened by NbTi-filaments were developed for the cryocooled superconducting magnet. We have already reported that the hybrid magnet could generate the resultant magnetic field of 27.5 T by adding 8.5 T from the superconducting magnet and 19 T from a water-cooled Bitter resistive magnet, after the water-cooled resistive magnet was inserted into the 360 mm room temperature bore of the cryocooled superconducting magnet. When the hybrid magnet generated the field of 27.5 T, it achieved the high magnetic-force field (B x ∂Bz/∂z) of 4500 T 2 /m, which was useful for magneto-science in high fields such as materials levitation research. In this paper, we particularly focus on the cause that the cryocooled superconducting magnet was limited to generate the designed magnetic field of 10 T in the hybrid magnet operation. As a result, it was found that there existed mainly two causes as the limitation of the magnetic field generation. One was a decrease of thermal conductive passes due to exfoliation from the coil bobbin of the cooling flange. The other was large AC loss due to both a thick Nb 3 Sn layer and its large diameter formed on Nb-barrier component in Nb 3 Sn wires.

  20. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  1. 47 CFR 32.2114 - Tools and other work equipment.

    Science.gov (United States)

    2010-10-01

    ... UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2114 Tools and other work equipment. This account shall include the original cost of special purpose... 47 Telecommunication 2 2010-10-01 2010-10-01 false Tools and other work equipment. 32.2114 Section...

  2. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  3. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  4. Electromagnetic Design Study for a Large Bore 15T Superconducting Dipole Magnet

    CERN Document Server

    Schwerg, N; Devred, Arnaud; Henke, H

    2005-01-01

    In the framework of research and development (R&D) activities at CERN the Next European Dipole (NED) program is one which is to the development of a high-field dipole magnet using Nb_3Sn superconductors. Part of the NED activities is a design study of different possible dipole configurations which is shared amongst the collaborating institutes. This thesis covers the electromagnetic design study of an 88 mm large bore superconducting 15 T dipole magnet with a coil cross section in cos-theta-layer design. Based on analytically describable geometries the sources of multipole errors are studied and elementary estimations of the magnet are carried out, e.g., the required amount of superconductors or the influence of the iron yoke thickness on the field quality. The magnet cross section for NED is optimized by means of the CERN field computation program ROXIE. The preliminary NED design serves as starting point for the coil cross section optimization with respect to field quality and a radial positioning of th...

  5. Drilling Load Model of an Inchworm Boring Robot for Lunar Subsurface Exploration

    Directory of Open Access Journals (Sweden)

    Weiwei Zhang

    2017-01-01

    Full Text Available In the past decade, the wireline robot has received increasing attention due to the advantages of light weight, low cost, and flexibility compared to the traditional drilling instruments in space missions. For the lunar subsurface in situ exploration mission, we proposed a type of wireline robot named IBR (Inchworm Boring Robot drawing inspiration from the inchworm. Two auger tools are utilized to remove chips for IBR, which directly interacted with the lunar regolith in the drilling process. Therefore, for obtaining the tools drilling characteristics, the chips removal principle of IBR is analyzed and its drilling load model is further established based on the soil mechanical theory in this paper. And then the proposed theoretical drilling load model is experimentally validated. In addition, according to the theoretical drilling load model, this paper discusses the effect of the drilling parameters on the tools drilling moments and power consumption. These results imply a possible energy-efficient control strategy for IBR.

  6. Electronic motion in the pre-oscillation phase of a smooth bore magnetron

    International Nuclear Information System (INIS)

    Garelis, E.; Hickman, R.B.

    1979-01-01

    The calculation of the electronic motion in the pre-oscillation phase of a smooth bore magnetron is the problem of calculating the electronic motion in the region between two concentric cylinders with an applied radial electric field and a constant axial B/sub z/ magnetic field. The inner cylinder represents the electron emitting cathode and the outer cylinder represents the anode. The emission is assumed to be space charge limited. This results in an electronic cloud surrounding the cathode. The radial velocity of the electrons is limited by the space charge and in addition the axial magnetic field tends to curve the path of the electrons so that they return to the cathode. Consequently, the electronic orbit extends to some distance r 0 from the cathode and for values of the radius r > r 0 exists a charge free region. The model assumes relativistic electronic motion with self-consistent magnetic fields. The magnetic flux is assumed to be conserved; i.e., conducting cylindrical walls

  7. Catalog of physical protection equipment. Book 1: Volume I. Barriers and structural components

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    A catalog of commercially available physical protection equipment has been prepared for use by the U.S. Nuclear Regulatory Commission (NRC). Included is information on barrier structures and equipment, interior and exterior intrusion detection sensors, entry (access) control devices, surveillance and alarm assessment equipment, contraband detection sensors, automated response equipment, general purpose displays and general purpose communications, with one volume devoted to each of these eight areas. For each item of equipment the information included consists of performance, physical, cost and supply/logistics data. The entire catalog is contained in three notebooks for ease in its use by licensing and inspection staff at NRC

  8. Catalog of physical protection equipment. Book 3: Volume VII. General purpose display components

    International Nuclear Information System (INIS)

    1977-06-01

    A catalog of commercially available physical protection equipment has been prepared under MITRE contract AT(49-24)-0376 for use by the U. S. Nuclear Regulatory Commission (NRC). Included is information on barrier structures and equipment, interior and exterior intrusion detection sensors, entry (access) control devices, surveillance and alarm assessment equipment, contraband detection sensors, automated response equipment, general purpose displays and general purpose communications, with one volume devoted to each of these eight areas. For each item of equipment the information included consists of performance, physical, cost and supply/logistics data. The entire catalog is contained in three notebooks for ease in its use by licensing and inspection staff at NRC

  9. TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final

    Energy Technology Data Exchange (ETDEWEB)

    Burgin, Jillian Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-07

    The primary activities and equipment areas at the facility that are potential stormwater pollution sources include; The storage of vehicles and heavy equipment awaiting repair; or repaired vehicles waiting to be picked up; The storage and handling of oils, anti-freeze, solvents, degreasers, batteries and other chemicals for the maintenance of vehicles and heavy equipment; and Equipment cleaning operations including exterior vehicle wash-down. Steam cleaning is only done on the steam cleaning pad area located at the north east end of Building 60-0001.

  10. A Low-Cost Indigenous Intervention which has Revolutionized the Drilling Technology and Changed the Life of Millions of Farmers in the State of Uttar Pradesh, India

    Science.gov (United States)

    Chaurasia, Pratik Ranjan; Subhash

    2018-06-01

    An unknown indigenous driller combined the percussion and circulation drilling principles, resulting in the development of low cost, low weight manual boring set in the year 1990-1991/1991-1992, which revolutionized the shallow well drilling technology and made possible to drill about 4.5 million shallow bore wells in the State. This has changed the landscape of irrigated agriculture, changing the life of millions of small and marginal farmers and contributed a lot in increasing crop production and crop productivity. The developed drilling equipment locally known as "Pressure Boring Set" is manually operated, low cost and can be transported on bicycles. Drilling cost is also less. This low cost and simple technology made it possible to drill large number of shallow bore wells in comparatively short time span and less cost, consequently enhancing the rate of increase in irrigated area and in turn crop production and productivity. Cost of the boring set is also low, as compared to traditional sand pump hand boring set and suitable for alluvial areas.

  11. A Low-Cost Indigenous Intervention which has Revolutionized the Drilling Technology and Changed the Life of Millions of Farmers in the State of Uttar Pradesh, India

    Science.gov (United States)

    Chaurasia, Pratik Ranjan; Subhash

    2018-02-01

    An unknown indigenous driller combined the percussion and circulation drilling principles, resulting in the development of low cost, low weight manual boring set in the year 1990-1991/1991-1992, which revolutionized the shallow well drilling technology and made possible to drill about 4.5 million shallow bore wells in the State. This has changed the landscape of irrigated agriculture, changing the life of millions of small and marginal farmers and contributed a lot in increasing crop production and crop productivity. The developed drilling equipment locally known as "Pressure Boring Set" is manually operated, low cost and can be transported on bicycles. Drilling cost is also less. This low cost and simple technology made it possible to drill large number of shallow bore wells in comparatively short time span and less cost, consequently enhancing the rate of increase in irrigated area and in turn crop production and productivity. Cost of the boring set is also low, as compared to traditional sand pump hand boring set and suitable for alluvial areas.

  12. Acceptance test procedure for the ultra high pressure bore head for use in the self-installing liquid observation well

    International Nuclear Information System (INIS)

    Hertelendy, N.A.

    1995-01-01

    In order to monitor waste stored in single-shell tanks, liquid observation wells (LOWs) are installed to permit periodic insertion of instrumentation probes to evaluate the waste cross sections. An ultra high pressure water bore head, developed for installing instrument trees, was adapted for use with the LOWs. The modification facilitates the removal of the high pressure water feed system after installation. This document describes a series of tests that ensures that the design meets all the functional requirements

  13. Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps – A case study

    OpenAIRE

    Prasnna Jain; A.K. Naithani; T.N. Singh

    2014-01-01

    A 12.24 km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine (TBM) to improve the water supply system of Greater Mumbai, India. In this paper, attempt has been made to establish the relationship between various litho-units of Deccan traps, stability of tunnel and TBM performances during the construction of 5.83 km long tunnel between Maroshi and Vakola. The Maroshi–Vakola tunnel passes under the Mumbai Airport and crosses both runways with an overburd...

  14. 36 CFR 1210.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1210.34 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... data, including date of disposal and sales price or the method used to determine current fair market... the following standards. For equipment with a current per unit fair market value of $5,000 or more...

  15. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  16. Some conclusions about the concrete strength of the bored piles of Angra 2 nuclear power plant

    International Nuclear Information System (INIS)

    Thomaz, E.C.S.; Joia, L.A.

    1984-01-01

    The concrete of the bored piles of Angra 2 was submitted to a deep control, so more than five thousand core samples were analyzed to verify the quality of the concrete. Based on these samples and using statistics regression theory some conclusions could be done. It was analyzed the dependence of the concrete strength upon the depth of the pile. Also based on these samples some probability distribution functions that could simulate the concrete strength were studied applying the Kolmogorov - Smirnov fitness test. Finally, a method for evaluating a confidence interval of one of the probability function (Weibull distribution) was developed adopting the Monte Carlo simulation technique. (Author) [pt

  17. Problems associated with accelerated thermal aging of electrical equipment

    International Nuclear Information System (INIS)

    Isgro, J.R.

    1984-01-01

    This paper discusses the potential problems that may be experienced when accounting for aging mechanisms in organic polymers when utilizing accelerated thermal aging techniques for electrical equipment qualification. Included are discussions of actual experiences and problems encountered in the qualification of electrical and electronic equipment for a complete nuclear power plant. The wide variety of approaches to thermal accelerated aging by various manufacturers of diverse equipment types provides depth to the discussion. A description of how to account for aging mechanisms is also presented

  18. Measurements of laser-hole boring into overdense plasmas using x-ray laser refractometry (invited)

    International Nuclear Information System (INIS)

    Kodama, R.; Takahashi, K.; Tanaka, K.A.; Kato, Y.; Murai, K.; Weber, F.; Barbee, T.W.; DaSilva, L.B.

    1999-01-01

    We developed a 19.6 nm laser x-ray laser grid-image refractometer (XRL-GIR) to diagnose laser-hole boring into overdense plasmas. The XRL-GIR was optimized to measure two-dimensional electron density perturbation on a scale of a few tens of μm in underdense plasmas. Electron density profiles of laser-produced plasmas were obtained for 10 20 - 10 22 cm -3 with the XRL-GIR and for 10 19 - 10 20 cm -3 from an ultraviolet interferometer, the profiles of which were compared with those from hydrodynamic simulation. By using this XRL-GIR, we directly observed laser channeling into overdense plasmas accompanied by a bow shock wave showing a Mach cone ascribed to supersonic propagation of the channel front. copyright 1999 American Institute of Physics

  19. Underground coal mining - methods, equipment developments and trends

    Energy Technology Data Exchange (ETDEWEB)

    Singhal, R

    1988-12-01

    Underground mines are truly beginning to accept the so-called 'high tech' technology evident in other industries. Automation, remote control and robotics have taken an added significance. Wireless communication, mine-wide equipment health and performance monitoring, and transmission of data from deeper levels to surface is moving towards becoming the norm. There is emphasis on developing and applying continuous mining systems, as well as on modifying cyclical discontinuous methods to continuous systems. Multi-purpose equipment is also being developed. Technology transfer is playing its role - equipment and systems from surface coal mining are being applied to underground mining and vice-versa. At the American Mining Congress Exhibition held in Chicago in April 1988, a variety of equipment for underground mining was displayed including coal face equipment such as shearer loaders, conveyors and powered supports, and equipment for room-and-pillar coal mining. The trend continues to be towards high power machines equipped with a variety of electronics and sensors, safety devices, and alarm systems. Ancillary equipment on display covered a variety of cutting drums, cutting tools, conveying equipment and so on. In room-and-pillar mining, the overall emphasis was on moving away from the cyclical nature of the work. Transportation by shuttle cars must be replaced by continuous transport systems such as conveyors. Experience from Australia has shown that the application of continuous haulage and breaker line supports has permitted a doubling of production from room-and-pillar systems. Production levels of 3,000tpd have already been achieved, and 4,000tpd is considered achievable.

  20. Ergonomic positioning or equipment for treating carpal tunnel syndrome.

    Science.gov (United States)

    O'Connor, Denise; Page, Matthew J; Marshall, Shawn C; Massy-Westropp, Nicola

    2012-01-18

    Non-surgical treatment, including ergonomic positioning or equipment, are sometimes offered to people experiencing mild to moderate symptoms from carpal tunnel syndrome (CTS). The effectiveness and duration of benefit from ergonomic positioning or equipment interventions for treating CTS are unknown. To assess the effects of ergonomic positioning or equipment compared with no treatment, a placebo or another non-surgical intervention in people with CTS. We searched the Cochrane Neuromuscular Disease Group Specialized Register (14 June 2011), the Cochrane Central Register of Controlled Trials (CENTRAL) (2011, Issue 2, in The Cochrane Library), MEDLINE (1966 to June 2011), EMBASE (1980 to June 2011), CINAHL Plus (1937 to June 2011), and AMED (1985 to June 2011). We also reviewed the reference lists of randomised or quasi-randomised trials identified from the electronic search. Randomised or quasi-randomised controlled trials comparing ergonomic positioning or equipment with no treatment, placebo or another non-surgical intervention in people with CTS. Two review authors independently selected trials for inclusion, extracted data and assessed risk of bias of included studies. We calculated risk ratios (RR) and mean differences (MD) with 95% confidence intervals (CI) for the primary and secondary outcomes. We pooled results of clinically and statistically homogeneous trials, where possible, to provide estimates of the effect of ergonomic positioning or equipment. We included two trials (105 participants) comparing ergonomic versus placebo keyboards. Neither trial assessed the primary outcome (short-term overall improvement) or adverse effects of interventions. In one small trial (25 participants) an ergonomic keyboard significantly reduced pain after 12 weeks (MD -2.40; 95% CI -4.45 to -0.35) but not six weeks (MD -0.20; 95% CI -1.51 to 1.11). In this same study, there was no difference between ergonomic and standard keyboards in hand function at six or 12 weeks or palm

  1. Research on the Combination of Underwater Acoustic Countermeasure Equipments Against Torpedo

    Directory of Open Access Journals (Sweden)

    Meng Jie

    2016-01-01

    Full Text Available Today the use of acoustic countermeasure equipment has become the main means in submarine defense torpedo operation. Combination of acoustic countermeasure equipments are used during the operation so that we can amplify the countermeasure effect. Based on the subject of the acoustic countermeasure equipments’ combined use, this paper analyses the interference between these soft kill countermeasure equipments including gas curtain, acoustic decoy and acoustic interferometer, summarizes the advantages and disadvantages of the different combined use of acoustic countermeasure equipments.

  2. Evaluación de tres dietas con harina de hoja de bore (Alocasia macrorrhiza) en pollos de engorde

    OpenAIRE

    López M, Fredy; Caicedo G, Alex; Alegría F, Gustavo

    2012-01-01

    RESUMENObjetivo. Evaluar el efecto nutricional de incluir la harina de hoja de bore, en proporciones de 0 (T1), 5 (T2), 10 (T3) y 15% (T4), en la alimentación de 100 pollos machos de la línea Ross 308. Materiales y Métodos. Se empleo un diseño experimental completamente al azar con cuatro tratamientos, cinco repeticiones por tratamiento y cinco unidades experimentales por repetición. Para su respectivo análisis se registró consumo diario, ganancia de peso, conversión alimenticia, mortalidad y...

  3. Characteristics and application study of AP1000 NPPs equipment reliability classification method

    International Nuclear Information System (INIS)

    Guan Gao

    2013-01-01

    AP1000 nuclear power plant applies an integrated approach to establish equipment reliability classification, which includes probabilistic risk assessment technique, maintenance rule administrative, power production reliability classification and functional equipment group bounding method, and eventually classify equipment reliability into 4 levels. This classification process and result are very different from classical RCM and streamlined RCM. It studied the characteristic of AP1000 equipment reliability classification approach, considered that equipment reliability classification should effectively support maintenance strategy development and work process control, recommended to use a combined RCM method to establish the future equipment reliability program of AP1000 nuclear power plants. (authors)

  4. INNOVATIONS IN EQUIPMENT AND TECHNIQUES FOR THE BIOLOGY TEACHING LABORATORY.

    Science.gov (United States)

    BARTHELEMY, RICHARD E.; AND OTHERS

    LABORATORY TECHNIQUES AND EQUIPMENT APPROPRIATE FOR TEACHING BIOLOGICAL SCIENCE CURRICULUM STUDY BIOLOGY ARE EMPHASIZED. MAJOR CATEGORIES INCLUDE (1) LABORATORY FACILITIES, (2) EQUIPMENT AND TECHNIQUES FOR CULTURE OF MICRO-ORGANISMS, (3) LABORATORY ANIMALS AND THEIR HOUSING, (4) TECHNIQUES FOR STUDYING PLANT GROWTH, (5) TECHNIQUES FOR STUDYING…

  5. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  6. Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, B. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Musolino, S. V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Klemic, G. [US Dept. of Homeland Security National Security Technology Lab., New York, NY (United States)

    2017-06-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence management missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.

  7. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  8. Free-face-Assisted Rock Breaking Method Based on the Multi-stage Tunnel Boring Machine (TBM) Cutterhead

    Science.gov (United States)

    Geng, Qi; Wei, Zhengying; Meng, Hao; Macias, Francisco Javier; Bruland, Amund

    2016-11-01

    In order to improve the rock breaking efficiency of hard rock tunnel boring, many innovative rock breaking methods have been proposed (e.g., the water jet cutting, the high-power laser cutting, the impact-rotary drilling, and the undercutting method). However, most of the methods are not applicable to TBMs due to some structural reasons. Aiming on this problem, a free-face-assisted rock breaking method based on the multi-stage TBM cutterhead has been proposed. Series of proof-of-concept tests includes (1) the static compression test with vertical free face and (2) the rotary cutting tests in different free surface conditions were designed and carried out. The results show that the rock breaking force and efficiency can be significantly reduced and improved, respectively, with the assistance of the free face, due to the failure of the rock close to the free face is tensile-dominated failure. The influencing distance of the free face in the radial direction is at least 330 mm which covers about 5 disk cutters. Finally, the general structure of a small two-stage cutterhead (4 m in diameter) was tentatively designed in order to provide a possible approach to apply the free-face effect to TBMs.

  9. Controlling the quality of replacement parts in nuclear station, class 1E equipment

    International Nuclear Information System (INIS)

    Pierson, R.K.; Clemons, R.W.

    1984-01-01

    Nuclear station owners have traditionally purchased replacement parts for Class 1E equipment from the original supplier of the equipment. By this method, part and equipment quality could be maintained. In recent years, however, this traditional source of parts has continuously declined as an increasing number of original equipment suppliers stop producing Class 1E equipment or no longer stock parts for older equipment. When replacement parts for Class 1E equipment are not obtainable from the original suppliers, equipment owners have created a variety of methods for assuring the quality of parts obtained from other sources. A standard that provides direction and guidance for maintaining the quality of Class 1E equipment when repaired with parts from alternate sources is, therefore, needed to assure the methods in use are satisfactory and to alert the equipment owners to additional acceptable methods. The standard has now been proposed. IEEE Standard P934 (June, 1983 Draft): ''Requirements for Replacement Parts for Class 1E Equipment in Nuclear Power Generating Stations'' (Ref-3) consist of an introductory section followed by sections on part selection, procurement, replacement (including inspections and tests), non-conforming conditions and records. The proposed standard also includes a non-mandatory appendix on acceptable procurement methods and a summary intended to assist the user in selecting a proper procurement method

  10. Electrostatic Properties of Selected Personal Protective Equipment Regarding Explosion Hazard

    Directory of Open Access Journals (Sweden)

    Marcin Jachowicz

    2013-01-01

    Full Text Available In industries such as the mining, petrochemistry or power industries, personal protective equipment is often used in explosive atmospheres. What causes the occurrence of explosive hazards is ever-present in the work environment they include, electrostatic phenomena as well as the build-up of electrical charges on the surface of the protective equipment used. This paper presents the results of studies which were aimed at determining the fundamental electrostatic parameters of protective helmets as well as eye and face protection, surface resistance and the voltage of electrostatic fields. Examinations on the typical structure of the above mentioned equipment was conducted including the variable values of ambient humidity, which can occur in the working environment and with the use of various types of materials used to generate a charge. The adopted methods and testing equipment have been presented. Using the current, general requirements regarding the electrostatic properties of materials, the examined helmets and eye protection were assessed for their use in explosive atmospheres.

  11. Capitalization of Defense Technology Security Administration Equipment

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1996-01-01

    ... $5.2 million in the Equipment in Use account on its trial balance. Starting with FY 1996, Defense Technology Security Administration financial data will be included in consolidated DoD financial statements...

  12. Novel preconcentration technique for on-line coupling to high-speed narrow-bore capillary gas chromatography: sample enrichment by equilibrium (ab)sorption, I: Principles and theoretical aspects

    NARCIS (Netherlands)

    Pham Tuan, H.; Janssen, J.G.M.; Cramers, C.A.M.G.

    1997-01-01

    In recent years, there has been substantial progress in the field of high-speed narrow-bore capillary gas chromatography (GC) in general, and in the development of (trans)portable gas chromatographs for fast and accurate analysis in field applications in particular. Due to the limited

  13. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  14. Correction of magnetization sextupole and decapole in a 5 centimeter bore SSC dipole using passive superconductor

    International Nuclear Information System (INIS)

    Green, M.A.

    1991-05-01

    Higher multipoles due to magnetization of the superconductor in four and five centimeter bore Superconducting Super Collider (SSC) superconducting dipole magnets have been observed. The use of passive superconductor to correct out the magnetization sextupole has been demonstrated on two dipoles built by the Lawrence Berkeley Laboratory (LBL). This reports shows how passive correction can be applied to the five centimeter SSC dipoles to remove sextupole and decapole caused by magnetization of the dipole superconductor. Two passive superconductor corrector options will be presented. The change in magnetization sextupole and decapole due to flux creep decay of the superconductor during injection can be partially compensated for using the passive superconductor. 9 refs; 5 figs

  15. 30 CFR 18.91 - Electric equipment for which field approvals will be issued.

    Science.gov (United States)

    2010-07-01

    ..., by the owner-coal mine operator of such machines including any associated electrical equipment... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric equipment for which field approvals... OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT...

  16. CONCEPTUAL DESIGN OF PION CAPTURE MAGNETS OF UP TO 15 CM BORE AND 20 T PEAK FIELD

    International Nuclear Information System (INIS)

    Weggel, R.J.

    2001-01-01

    For the Neutrino Factory and Muon Collider Collaboration, BNL has considered solenoidal magnet systems of several types to capture pions generated by bombarding a mercury jet with multi-GeV protons. The magnet systems generate up to 20 T, uniform to 5% throughout a cylindrical volume 0.15 m in diameter and 0.6 m long. Axially downstream the field ramps gradually downward by a factor of sixteen, while the bore increases fourfold. The steady-state system needed for an accelerator has many superconducting coils and a radiation-resistant insert of mineral-insulated hollow conductor. Less costly, pulsed systems suffice to study pion capture and the effect of a magnetic field on a jet hit by a proton beam. BNL has explored three types of magnets, each with its principal coils precooled by liquid nitrogen. One type employs two sets of coils energized sequentially. Charged in 23 s by a power supply of 5 MVA, the 16ton outer set generates 10 T and stores 28 MJ, from which, in 1/3 s, to charge a half-ton inner coil that adds 12 1/2 T to the 7 1/2 T remaining from the outer set. An alternative design uses 25 MVA to energize, in 1.4 s, a single 3-ton set of coils. The third type bows to budgetary constraints and is more modest in size and performance. A magnet of 2-3 tons generates 10-11 T with only 2 MVA, in a bore big enough (11 cm) to accommodate the jet. It forgoes the field ramp that improves pion retention

  17. Kinetic investigation of narrow-bore columns packed with prototype sub-2 μm superficially porous particles with various shell thickness.

    Science.gov (United States)

    Gritti, Fabrice; Omamogho, Jesse; Guiochon, Georges

    2011-10-07

    The recent successful breakthrough of sub-3 μm shell particles in HPLC has triggered considerable research efforts toward the design of new brands of core-shell particles. We investigated the mass transfer mechanism of a few analytes in narrow-bore columns packed with prototype 1.7 μm shell particles, made of 1.0, 1.2, and 1.4 μm solid nonporous cores surrounded by porous shells 350, 250, and 150 nm thick, respectively. Three probe solutes, uracil, naphthalene, and insulin, were chosen to assess the kinetic performance of these columns. Inverse size exclusion chromatography, peak parking experiments, and the numerical integration of the experimental peak profiles were carried out in order to measure the external, internal, and total column porosities, the true bulk diffusion coefficients of these analytes, the height equivalent to a theoretical plate, the longitudinal diffusion term, and the trans-particle mass transfer resistance term. The residual eddy diffusion term was measured by difference. The results show the existence of important trans-column velocity biases (7%) possibly due to the presence of particle multiplets in the slurry mixture used during the packing process. Our results illustrates some of the difficulties encountered by scientists preparing and packing shell particles into narrow-bore columns. Copyright © 2011 Elsevier B.V. All rights reserved.

  18. Simulation of rock fragmentation induced by a tunnel boring machine disk cutter

    Directory of Open Access Journals (Sweden)

    Huiyun Li

    2016-05-01

    Full Text Available A constitutive model based on the Johnson–Cook material model and the extended Drucker–Prager strength criterion was implemented in LS-DYNA to simulate the rock failure process induced by a single disk cutter of a tunnel boring machine. The normal, rolling, and side forces were determined by numerical tests. The simulation results showed that the normal and rolling forces increased with increasing penetration while the side force changed little. The normal force also increased under the conditions of confining pressures. The damage region of rock and cutting forces were also obtained by simulation of two disk cutters acting in tandem with different cutting spacings. The optimum ratio of cutter spacing to penetration depth determined from numerical modeling agrees well with that obtained by linear cutting machine tests. The average normal and rolling forces acting on the first cutter are slightly greater than those acting on the second when the cutting disk spacing is relatively small. The numerical modeling was verified to accurately capture the fragmentation of rock induced by disk cutter.

  19. Report of the electric Equipment Service - Annex E

    International Nuclear Information System (INIS)

    Karic, Z.

    2002-01-01

    This report describes organisational structure of the Service dealing with control and maintenance of electrical supply system and equipment. It includes detailed data about electric power consumption, power cuts and failures during the past period. Activity plan for year 2002 is included [sr

  20. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  1. Beyond the glitz of new equipment

    International Nuclear Information System (INIS)

    Stolberg, H.O.; Nahmias, C.

    2001-01-01

    Canadian radiologists were informed by the press on Mar. 17, 2001, about an important initiative of their national organization. The CAR had commissioned a Montreal law firm to provide a legal opinion about the use of 'obsolete equipment'. The lawyer of the law firm opined that 'it is imperative that the patient be advised and understand the risks and uncertainties associated with the reliability of such an examination'. The 5-page legal opinion (available at www.car.ca) also recommended that radiologists inform patients that they should consider shopping around for a hospital or clinic with newer machines, even if it means travelling out of the country. When summarizing the legal advice for the media, the Chief Executive Officer of the CAR said radiologists should advise patients if better equipment is available in other facilities, including 'private facilities', or in other jurisdictions, such as the United States. These developments should be of great concern to Canadian radiologists who are well aware of the problems associated with aging equipment and the lack of and limited access to newer imaging modalities. The legal initiative of the CAR, however, makes it imperative for individual radiologists to provide comments and for the CAR executive to answer a number of questions and address a number of priorities, including the following. (author)

  2. Special servicing equipment for reactor pressurized vessel stud hole and stud accessories

    International Nuclear Information System (INIS)

    Li Jianglian

    1999-01-01

    The author briefly introduces the design and manufacture of nuclear island special servicing equipment of Nuclear Power Institute of China. Maintenance process of reactor pressurized vessel (RPV) stud hold and stud accessories the special servicing equipment include RPV flange dummy, closed-circuit television (CCTV) inspection equipment, RPV stud hole expandable comb, RPV stud hole polisher, RPV stud hold thread lubricating equipment, RPV stud hole thread miller and RPV stud hole camera. It is presented how eight kinds of special servicing equipment perform the maintenance process concerning their function, structure, and characteristics, their practical use on site is also introduced

  3. User's manual for the master equipment list. Phase 1

    International Nuclear Information System (INIS)

    Sandoval, J.D.

    1997-01-01

    This manual is intended to provide a user with enough detailed instruction to guide them through the Master Equipment List Phase 1 (MEL Phase 1) application system operations. The MEL Phase 1 application is a database system that stores Equipment Identification Number (EIN) information to support equipment tracking in the 200E and 200W Tank Farms for the Tank Waste Remediation System Division. The MEL Phase 1 application supports both the user application and administrative control functions. The user application functions include: viewing by Folder, reporting, performing queries, and editing specific data. The administrative control functions include: maintaining valid user identifications, passwords, privileges, defining drop-down lists, and review of the change log relating to EIN data entries, additions, deletions, and editing. The scope of this User's Manual is to discuss these functions and is intended to guide users and answer questions regarding the MEL Phase 1 application

  4. Equipment response spectra for base-isolated shear beam structures

    International Nuclear Information System (INIS)

    Ahmadi, G.; Su, L.

    1992-01-01

    Equipment response spectra in base-isolated structure under seismic ground excitations are studied. The equipment is treated as a single-degree-of-freedom system attached to a nonuniform elastic beam structural model. Several leading base isolation systems, including the laminated rubber bearing, the resilient-friction base isolator with and without a sliding upper plate, and the EDF system are considered. Deflection and acceleration response spectra for the equipment and the shear beam structure subject to a sinusoidal and the accelerogram of the N00W component of El Centro 1940 earthquake are evaluated. Primary-secondary interaction effects are included in the analysis. Several numerical parametric studies are carried out and the effectiveness of different base isolation systems in protecting the nonstructural components is studied. It is shown that use of properly designed base isolation systems provides considerable protection for secondary systems, as well as, the structure against severe seismic loadings. (orig.)

  5. 42 CFR 410.38 - Durable medical equipment: Scope and conditions.

    Science.gov (United States)

    2010-10-01

    ... or purchase of durable medical equipment, including iron lungs, oxygen tents, hospital beds, and wheelchairs, if the equipment is used in the patient's home or in an institution that is used as a home. (b... vehicle whose steering is operated by an electronic device or a joystick to control direction and turning...

  6. Proceedings of the European Symposium on Pressure Equipment - ESOPE 2004

    International Nuclear Information System (INIS)

    2004-01-01

    The symposium on Pressure Equipment Technology, organised every three years by the AFIAP (Association Francaise des Ingenieurs en Appareils a Pression), for the second time is organised at the European level. It is the 'European Symposium on Pressure Equipment, ESOPE 2004'. This symposium is placed under the patronage of the Minister of Industry. The central theme of ESOPE 2001 has been the European Directives for Fixed Equipment (PED) and for Transportable Equipment (TPED). ESOPE 2004 will be a state on the application of these Directives after 3 years of use. The first plenary session will made the comparison of some National codes with EN13445 standard and of the evolution of the Asme code. But the principal theme of the second plenary session and the panel, where European experts will answer to your questions, will be on 'Pressure equipment life management'. It therefore seems important to incorporate this subject into the agenda of this symposium in order to allow widespread dialogue between the industrial members concerned. Our association, AFIAP, has the advantage of regrouping all the industrial partners concerned, from the end user and the administrative body responsible for equipment safety, to the pressure equipment fabricator and his materials suppliers, also including those bodies responsible for design, inspection and certification. To improve availability of equipment and reduce production costs the most efficient way is the development of technology. It is essential to improve competitiveness of European companies. Research is necessary, but the results must be available to everyone, including small and medium-sized industries. ESOPE 2004 has 3 technical sessions in parallel, which will be followed, by many fruitful exchanges of experience: - design/materials - fabrication/welding/inspection - fitness for service. You will find on a CD-Rom all the contributions which have been presented. (authors)

  7. Spiral MRI on a 9.4T Vertical-bore Superconducting Magnet Using Unshielded and Self-shielded Gradient Coils.

    Science.gov (United States)

    Kodama, Nao; Setoi, Ayana; Kose, Katsumi

    2018-04-10

    Spiral MRI sequences were developed for a 9.4T vertical standard bore (54 mm) superconducting magnet using unshielded and self-shielded gradient coils. Clear spiral images with 64-shot scan were obtained with the self-shielded gradient coil, but severe shading artifacts were observed for the spiral-scan images acquired with the unshielded gradient coil. This shading artifact was successfully corrected with a phase-correction technique using reference scans that we developed based on eddy current field measurements. We therefore concluded that spiral imaging sequences can be installed even for unshielded gradient coils if phase corrections are performed using the reference scans.

  8. Review of equipment aging theory and technology. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Carfagno, S.P.; Gibson, R.J.

    1980-09-01

    The theory and technology of equipment aging is reviewed, particularly as they relate to the qualification of safety-system equipment for nuclear power generating stations. A fundamental degradation model is developed, and its relation to more restricted models (e.g., Arrhenius and inverse-stress models) is shown. The most common theoretical and empirical models of aging are introduced, and limitations on their practical application are analyzed. Reliability theory and its application to the acceleration of aging are also discussed. A compendium of aging data for materials and components, including degradation mechanisms, failure modes and activation energies, is included.

  9. Review of equipment aging theory and technology. Final report

    International Nuclear Information System (INIS)

    Carfagno, S.P.; Gibson, R.J.

    1980-09-01

    The theory and technology of equipment aging is reviewed, particularly as they relate to the qualification of safety-system equipment for nuclear power generating stations. A fundamental degradation model is developed, and its relation to more restricted models (e.g., Arrhenius and inverse-stress models) is shown. The most common theoretical and empirical models of aging are introduced, and limitations on their practical application are analyzed. Reliability theory and its application to the acceleration of aging are also discussed. A compendium of aging data for materials and components, including degradation mechanisms, failure modes and activation energies, is included

  10. Catalog of physical protection equipment. Book 3: Volume VI. Automated response components

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    The Catalog of Physical Protection Equipment presents information on currently available physical protection equipment that could be employed to safeguard special nuclear materials. The primary source of information was the responses of manufacturers and vendors to requests for literature and data. All equipment listed in the Catalog has been screened in accordance with the following general criteria, and only items meeting one or more of these criteria have been included: (1) equipment is commercially available off-the-shelf; (2) equipment is currently in use at commercial nuclear facilities licensed or to be licensed by NRC; (3) equipment is applicable for use at nuclear facilities licensed or to be licensed by NRC; (4) equipment can operate in the environmental conditions present at nuclear facilities; and (5) equipment is not designed solely or primarily for residential use. The final report describes the methodology and rationale used to create the Catalog of Physical Protection Equipment

  11. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  12. Optical system for UV-laser technological equipment

    Science.gov (United States)

    Fedosov, Yuri V.; Romanova, Galina E.; Afanasev, Maxim Ya.

    2017-09-01

    Recently there has been an intensive development of intelligent industrial equipment that is highly automated and can be rapidly adjusted for certain details. This equipment can be robotics systems, automatic wrappers and markers, CNC machines and 3D printers. The work equipment considered is the system for selective curing of photopolymers using a UV-laser and UV-radiation in such equipment that leads to additional technical difficulties. In many cases for transporting the radiation from the laser to the point processed, a multi-mirror system is used: however, such systems are usually difficult to adjust. Additionally, such multi-mirror systems are usually used as a part of the equipment for laser cutting of metals using high-power IR-lasers. For the UV-lasers, using many mirrors leads to crucial radiation losses because of many reflections. Therefore, during the development of the optical system for technological equipment using UV-laser we need to solve two main problems: to transfer the radiation for the working point with minimum losses and to include the system for controlling/handling the radiation spot position. We introduce a system for working with UV-lasers with 450mW of power and a wavelength of 0.45 μm based on a fiber system. In our modelling and design, we achieve spot sizes of about 300 μm, and the designed optical and mechanical systems (prototypes) were manufactured and assembled. In this paper, we present the layout of the technological unit, the results of the theoretical modelling of some parts of the system and some experimental results.

  13. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  14. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  15. Design And Construction Of A 15 T, 120 MM Bore IR Quadrupole Magnet For LARP

    International Nuclear Information System (INIS)

    Caspi, S.; Cheng, D.; Dietderich, D.; Felice, H.; Ferracin, P.; Hafalia, R.; Hannaford, R.; Sabbi, G.S.; Anerella, M.; Ghosh, A.; Schmalzle, J.; Wanderer, P.; Ambrosio, G.; Bossert, R.; Kashikhin, V.; Pasholk, D.; Zlobin, A.

    2009-01-01

    Pushing accelerator magnets beyond 10 T holds a promise of future upgrades to machines like the Large Hadron Collider (LHC) at CERN. Nb 3 Sn conductor is at the present time the only practical superconductor capable of generating fields beyond 10 T. In support of the LHC Phase-II upgrade, the US LHC Accelerator Research Program (LARP) is developing a large bore (120 mm) IR quadrupole (HQ) capable of reaching 15 T at its conductor peak field and a peak gradient of 219 T/m at 1.9 K. While exploring the magnet performance limits in terms of gradient, forces and stresses the 1 m long two-layer coil will demonstrate additional features such as alignment and accelerator field quality. In this paper we summarize the design and report on the magnet construction progress.

  16. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  17. Instrumentation qualification. Seismic qualification of C-E instrumentation equipment. Part One

    International Nuclear Information System (INIS)

    1977-05-01

    A summary of the C-E seismic qualification program utilized to demonstrate the seismic design adequacy of the instrumentation and control equipment used in C-E supplied Nuclear Steam Supply Systems (NSSS) is presented. The report is divided into two parts. Part One includes the equipment seismic requirements and a description of the qualification methods. Part Two lists the specific equipment by nuclear station in which it is used and the equipment test results are summarized in a standard data sheet format to facilitate review. The seismic requirements are based on individual contract commitments with C-E customers and the NRC Standard Review Plan, Section 3.10 ''Seismic Qualification of Category I Instrumentation and Electrical Equipment.'' Equipment is qualified for use in a seismic environment where damage potential to the equipment is less than or equal to that simulated seismic environment to which it has been qualified. The anticipated Safe Shutdown Earthquake (SSE) environment at the inservice location of equipment should be confirmed by each applicant as not exceeding that to which it is qualified

  18. Apollo experience report: Development flight instrumentation. [telemetry equipment for space flight test program

    Science.gov (United States)

    Farmer, N. B.

    1974-01-01

    Development flight instrumentation was delivered for 25 Apollo vehicles as Government-furnished equipment. The problems and philosophies of an activity that was concerned with supplying telemetry equipment to a space-flight test program are discussed. Equipment delivery dates, system-design details, and flight-performance information for each mission also are included.

  19. Construction features of the exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    Adair, G.W.; Fiore, J.N.

    1984-01-01

    The Exploratory Shaft (ES) at Yucca Mountain is planned to be constructed during 1985 and 1986 as part of the detailed site characterization for one of three sites which may be selected as candidates for location of a high-level radioactive waste repository. Conventional mining methods will be used for the shaft sinking phase of the ES project. The ES will be comprised of surface support facilities, a 1480-ft-deep circular shaft lined with concrete to a finished inside diameter of 12 ft, lateral excavations and test installations extending up to 200 ft from the shaft, and long lateral borings extending up to 2300 ft from the shaft. The estimated time for sinking the shaft to a total depth of about 1480 ft and completing the lateral excavations and borings is about two years. The major underground development planned for the primary test level at a depth of 1200 ft consists of the equivalent of 1150 ft of 15- by 15-ft drift. The total volume of rock to be removed from the shaft proper and the lateral excavations totals about 1/2 million cubic feet. Construction equipment for the shaft and underground excavation phases consists of conventional mine hoisting equipment, shot hole and rock bolt drilling jumbos, mucking machines, and hauling machines. The desire to maintain relatively uniform and even walls in selected shaft and drift intervals will require that controlled blasting techniques be employed. Certain lateral boring operations associated with tests to be conducted in the underground development may pose some unusual problems or require specialized equipment. One of the operations is boring and lining a 30-in.-diam by 600-ft-long horizontal hole with a boring machine being developed under the direction of Sandia National Laboratories. Another special operation is coring long lateral holes (500 to 2000 ft) with minimum use of liquid circulating fluids. 8 figures

  20. The tendency of medical electrical equipment - IEC 60601-2-54: Particular requirements for the basic safety and essential performance of x-ray equipment for radiography and radioscopy

    International Nuclear Information System (INIS)

    Roh, Young Hoon; Kim, Jung Min

    2015-01-01

    Medical electrical equipment - Part 1: General requirement for basic safety and essential performance of MFDS was revised as 3th edition and Medical electrical equipment Part 2-54: Particular requirements for the basic safety and essential performance of X-ray equipment will be expected to be announced as notification. Therefore this technical report was written to introduce provision of the particular requirements, replacement, addition, amendment. The purpose of this particular requirements is to secure requirements for basic safety and essential performance of X-ray equipment for radiography and radioscopy. X-ray high voltage generator, mechanical protective device, protection against radiation is included in this particular requirements. Medical electrical equipment - Part 1, Part 1-2, Part 1-3 is applied to this particular requirements. If the requirements is announced as notification, It is expected to widen understanding for basic safety and essential performance of X-ray equipment for radiography and radioscopy and play a part to internationalize of medical equipment

  1. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  2. Project management in nuclear equipment manufacture

    International Nuclear Information System (INIS)

    Liu Jiancheng

    2005-01-01

    The completion of the management organization shall be firstly considered in project management for a nuclear power plant. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press usr bearing equipment, and the vice general manager takes responsibility for the quality, technology and schedule related with the manufacture of the equipment, and organizes the organization department for the audit. The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel. The manufacture schedule shall be prepared to ensure the implementation feasibility, process continuity and flexibility. The schedule shall be followed and monitored for the whole process, to check and feedback the implementation. (authors)

  3. TDRSS S-shuttle unique receiver equipment

    Science.gov (United States)

    Weinberg, A.; Schwartz, J. J.; Spearing, R.

    1985-01-01

    Beginning with STS-9, the Tracking and Date Relay Satellite system (TDRSS) will start providing S- and Ku-band communications and tracking support to the Space Shuttle and its payloads. The most significant element of this support takes place at the TDRSS White Sands Ground Terminal, which processes the Shuttle return link S- and Ku-band signals. While Ku-band hardware available to other TDRSS users is also applied to Ku-Shuttle, stringent S-Shuttle link margins have precluded the application of the standard TDRSS S-band processing equipment to S-Shuttle. It was therfore found necessary to develop a unique S-Shuttle Receiver that embodies state-of-the-art digital technology and processing techniques. This receiver, developed by Motorola, Inc., enhances link margins by 1.5 dB relative to the standard S-band equipment and its bit error rate performance is within a few tenths of a dB of theory. An overview description of the Space Shuttle Receiver Equipment (SSRE) is presented which includes the presentation of block diagrams and salient design features. Selected, measured performance results are also presented.

  4. Radioactive wastes assay technique and equipment

    International Nuclear Information System (INIS)

    Lee, K. M.; Hong, D. S; Kim, T. K.; Bae, S. M.; Shon, J. S.; Hong, K. P.

    2004-12-01

    The waste inventory records such as the activities and radio- nuclides contained in the waste packages are to be submitted with the radioactive wastes packages for the final disposal. The nearly around 10,000 drums of waste stocked in KAERI now should be assayed for the preparation of the waste inventory records too. For the successive execution of the waste assay, the investigation into the present waste assay techniques and equipment are to be taken first. Also the installation of the waste assay equipment through the comprehensive design, manufacturing and procurement should be proceeded timely. As the characteristics of the KAERI-stocked wastes are very different from that of the nuclear power plant and those have no regular waste streams, the application of the in-direct waste assay method using the scaling factors are not effective for the KAERI-generated wastes. Considering for the versal conveniency including the accuracy over the wide range of waste forms and the combination of assay time and sensitivity, the TGS(Tomographic Gamma Scanner) is appropriate as for the KAERI -generated radioactive waste assay equipment

  5. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  6. The design and qualification of radiation tolerant equipment for the nuclear power industry

    International Nuclear Information System (INIS)

    Sharp, R.; Pater, L.

    1995-01-01

    The nuclear power industry has many demands for equipment tolerant to the damaging effects of radiation. The wide variety of applications, including components handling, tooling, monitoring and communications, means that a systematic evaluation of the effects of radiation on materials and components used for equipment in radioactive facilities is often required. This paper describes the various effects of radiation on equipment, and discusses how to manage them when using and designing equipment. (Author)

  7. Fire extinguishing of electrical equipment under voltage at nuclear power plants

    International Nuclear Information System (INIS)

    Capek, Josef

    2009-01-01

    Fire extinguishing on equipment that is under voltage is always hazardous. Conventional fire fighting equipment applicable to this task includes powder and gas extinguishers, which, however, have some drawbacks. Therefore, attention has been increasingly devoted to high-pressure fire extinguishing, whose assets include better heat removal as compared to a full water flow where the majority of the water runs off without any cooling effect. This article describes the testing of some types and combinations of extinguishing techniques and their interpretation based on earth-leakage current measurement and determination of a safe distance for fire extinguishing. Methodology described in CSN IEC 60-1:1994 and CSN EN 3-7:2004 was applied. To meet the criterion, none of the tests was to exhibit an earth-leakage current higher than 0.5 mA. In the accredited laboratory test room setup, 3 extinguishing equipment arrangements proved to extinguish fire on electrical equipment under voltage at a safe distance of 1 m (or 3 m). (orig.)

  8. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  9. Techniques for Interventional MRI Guidance in Closed-Bore Systems.

    Science.gov (United States)

    Busse, Harald; Kahn, Thomas; Moche, Michael

    2018-02-01

    Efficient image guidance is the basis for minimally invasive interventions. In comparison with X-ray, computed tomography (CT), or ultrasound imaging, magnetic resonance imaging (MRI) provides the best soft tissue contrast without ionizing radiation and is therefore predestined for procedural control. But MRI is also characterized by spatial constraints, electromagnetic interactions, long imaging times, and resulting workflow issues. Although many technical requirements have been met over the years-most notably magnetic resonance (MR) compatibility of tools, interventional pulse sequences, and powerful processing hardware and software-there is still a large variety of stand-alone devices and systems for specific procedures only.Stereotactic guidance with the table outside the magnet is common and relies on proper registration of the guiding grids or manipulators to the MR images. Instrument tracking, often by optical sensing, can be added to provide the physicians with proper eye-hand coordination during their navigated approach. Only in very short wide-bore systems, needles can be advanced at the extended arm under near real-time imaging. In standard magnets, control and workflow may be improved by remote operation using robotic or manual driving elements.This work highlights a number of devices and techniques for different interventional settings with a focus on percutaneous, interstitial procedures in different organ regions. The goal is to identify technical and procedural elements that might be relevant for interventional guidance in a broader context, independent of the clinical application given here. Key challenges remain the seamless integration into the interventional workflow, safe clinical translation, and proper cost effectiveness.

  10. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  11. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  12. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  13. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  14. Including Students with Visual Impairments: Softball

    Science.gov (United States)

    Brian, Ali; Haegele, Justin A.

    2014-01-01

    Research has shown that while students with visual impairments are likely to be included in general physical education programs, they may not be as active as their typically developing peers. This article provides ideas for equipment modifications and game-like progressions for one popular physical education unit, softball. The purpose of these…

  15. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  16. Initial acceptance test experience with FFTF plant equipment

    International Nuclear Information System (INIS)

    Brown, R.K.; Coleman, K.A.; Mahaffey, M.K.; McCargar, C.G.; Young, M.W.

    1978-09-01

    The purpose of this paper is to examine the initial acceptance test experience of certain pieces of auxiliary equipment of the Fast Flux Test Facility (FFTF). The scope focuses on the DHX blowers and drive train, inert gas blowers, H and V containment isolation valves, and the Surveillance and In-service Inspection (SISI) transporter and trolley. For each type of equipment, the discussion includes a summary of the design and system function, installation history, preoperational acceptance testing procedures and results, and unusual events and resolutions

  17. An assessment the severe accident equipment survivability for the Korean Next Generation Reactor

    International Nuclear Information System (INIS)

    Lee, B. C.; Moon, Y. T.; Park, J. W.; Kho, H. J.; Lee, S. W.

    1999-01-01

    One of the prominent design approaches to cope with the severe accident challenges in the Korean Next Generation Reactor is an assessment of equipment survivability in the severe accident environment at early design stage. In compliance with 10CFR50.34(f) and SECY-93-087, this work addresses that a reasonable level of assurance be provided to demonstrate that sufficient instrumentation and equipment will survive the consequences of a severe accident and will be available so that the operator may recover from and trend severe core damage sequences, including those scenarios which result in 100 percent oxidation of the active fuel cladding. An analytical and systematic approach was used to identify the equipment and instrumentation of safety-function and define severe accident environments including temperature, pressure, humidity, and radiation before and after the reactor vessel breach. As a result, it was concluded that with minor exceptions, existing design basis equipment qualification methods are sufficient to provide a reasonable level of assurance that this equipment will function during a severe accident. Furthermore, supplemental severe accident equipment and instrument procurement requirements were identified. (author)

  18. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  19. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  20. Proceedings of the 11. annual mining industry learning seminar : 2006 equipment evolutions

    Energy Technology Data Exchange (ETDEWEB)

    Joseph, T. [Alberta Univ., Edmonton, AB (Canada). School of Mining and Petroleum Engineering] (comp.)

    2006-07-01

    This seminar provided a forum for mine engineers, geologists, operators, vendors and academics to discuss various topics on equipment evolution that address mining industry concerns. Participants included those who are involved in mine planning, equipment selection, operations and maintenance. The presentations identified possible solutions to ongoing issues and alternative technologies emerging in the mining industry. Operators and original equipment manufacturers shared their innovations in novel developments and presented solutions to issues relevant to mining processes including truck and shovel technology issues such as tires, lube and fuel emissions. The seminar featured 17 presentations, of which 5 have been catalogued separately for inclusion in this database. tabs., figs.