WorldWideScience

Sample records for equipment assignments spokane

  1. Compilation of geologic, hydrologic, and ground-water flow modeling information for the Spokane Valley-Rathdrum Prairie aquifer, Spokane County, Washington, and Bonner and Kootenai Counties, Idaho

    Science.gov (United States)

    Kahle, Sue C.; Caldwell, Rodney R.; Bartolino, James R.

    2005-01-01

    The U.S. Geological Survey, in cooperation with the Idaho Department of Water Resources and Washington Department of Ecology compiled and described geologic, hydrologic, and ground-water flow modeling information about the Spokane Valley-Rathdrum Prairie (SVRP) aquifer in northern Idaho and northeastern Washington. Descriptions of the hydrogeologic framework, water-budget components, ground- and surface-water interactions, computer flow models, and further data needs are provided. The SVRP aquifer, which covers about 370 square miles including the Rathdrum Prairie, Idaho and the Spokane valley and Hillyard Trough, Washington, was designated a Sole Source Aquifer by the U.S. Environmental Protection Agency in 1978. Continued growth, water management issues, and potential effects on water availability and water quality in the aquifer and in the Spokane and Little Spokane Rivers have illustrated the need to better understand and manage the region's water resources. The SVRP aquifer is composed of sand, gravel, cobbles, and boulders primarily deposited by a series of catastrophic glacial outburst floods from ancient Glacial Lake Missoula. The material deposited in this high-energy environment is coarser-grained than is typical for most basin-fill deposits, resulting in an unusually productive aquifer with well yields as high as 40,000 gallons per minute. In most places, the aquifer is bounded laterally by bedrock composed of granite, metasedimentary rocks, or basalt. The lower boundary of the aquifer is largely unknown except along the margins or in shallower parts of the aquifer where wells have penetrated its entire thickness and reached bedrock or silt and clay deposits. Based on surface geophysics, the thickness of the aquifer is about 500 ft near the Washington-Idaho state line, but more than 600 feet within the Rathdrum Prairie and more than 700 feet in the Hillyard trough based on drilling records. Depth to water in the aquifer is greatest in the northern

  2. Managing the Development of the Public Telecommunications Center, Spokane, Washington.

    Science.gov (United States)

    Schaar, Walter

    When the city council of Spokane (Washington) decided in 1971 to establish a cable franchise, it created a citizens' committee to set cable specifications. Representing Spokane School District 81 and KSPS-TV (a public television station licensed to the public schools of Spokane), the author of this document served on the committee that set five…

  3. Ground-Water Flow Model for the Spokane Valley-Rathdrum Prairie Aquifer, Spokane County, Washington, and Bonner and Kootenai Counties, Idaho

    Science.gov (United States)

    Hsieh, Paul A.; Barber, Michael E.; Contor, Bryce A.; Hossain, Md. Akram; Johnson, Gary S.; Jones, Joseph L.; Wylie, Allan H.

    2007-01-01

    This report presents a computer model of ground-water flow in the Spokane Valley-Rathdrum Prairie (SVRP) aquifer in Spokane County, Washington, and Bonner and Kootenai Counties, Idaho. The aquifer is the sole source of drinking water for more than 500,000 residents in the area. In response to the concerns about the impacts of increased ground-water withdrawals resulting from recent and projected urban growth, a comprehensive study was initiated by the Idaho Department of Water Resources, the Washington Department of Ecology, and the U.S. Geological Survey to improve the understanding of ground-water flow in the aquifer and of the interaction between ground water and surface water. The ground-water flow model presented in this report is one component of this comprehensive study. The primary purpose of the model is to serve as a tool for analyzing aquifer inflows and outflows, simulating the effects of future changes in ground-water withdrawals from the aquifer, and evaluating aquifer management strategies. The scale of the model and the level of detail are intended for analysis of aquifer-wide water-supply issues. The SVRP aquifer model was developed by the Modeling Team formed within the comprehensive study. The Modeling Team consisted of staff and personnel working under contract with the Idaho Department of Water Resources, personnel working under contract with the Washington Department of Ecology, and staff of the U.S. Geological Survey. To arrive at a final model that has the endorsement of all team members, decisions on modeling approach, methodology, assumptions, and interpretations were reached by consensus. The ground-water flow model MODFLOW-2000 was used to simulate ground-water flow in the SVPR aquifer. The finite-difference model grid consists of 172 rows, 256 columns, and 3 layers. Ground-water flow was simulated from September 1990 through September 2005 using 181 stress periods of 1 month each. The areal extent of the model encompasses an area of

  4. 78 FR 7448 - Final Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino...

    Science.gov (United States)

    2013-02-01

    ... Proposed Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights, Spokane...) for the Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights... casino-resort facility, parking structure, site retail, commercial building, tribal cultural center, and...

  5. 77 FR 24976 - Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino...

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights, Spokane... Impact Statement (DEIS) for the Spokane Tribe of Indians West Plains casino and mixed use project, City...

  6. 77 FR 12873 - Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino...

    Science.gov (United States)

    2012-03-02

    ... Proposed Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights, Spokane... statement with the U.S. Environmental Protection Agency for the Spokane Tribe of Indians West Plains casino... determination by the Secretary of the Interior; and (2) development of a casino-resort facility, parking...

  7. Spokane Tribal Hatchery, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2004-05-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Combined fish stocking by the hatcheries and net pen rearing projects in 2003 included: 899,168 kokanee yearlings released into Lake Roosevelt; 1,087,331 kokanee fry/fingerlings released into Banks Lake, 44,000 rainbow trout fingerlings and; 580,880 rainbow trout yearlings released into Lake Roosevelt. Stock composition of 2003 releases consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2003 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to

  8. Spokane Tribal Hatchery, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2006-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting harvestable fisheries for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). The Spokane Tribe, Washington Department of Fish and Wildlife, Colville Confederated Tribes and Lake Roosevelt Development Association/Lake Roosevelt Volunteer Net Pen Project are cooperating in a comprehensive artificial production program to produce kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) for annual releases into the project area. The program consists of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and Lake Roosevelt Rainbow Trout Net Pen Rearing Projects. The Lake Roosevelt and Banks Lake Fisheries Evaluation Program monitor and evaluates release strategies and production methods for the aforementioned projects. Between 1985 and 2005 the projects have collectively produced up to 800,000 rainbow trout and 4 million kokanee salmon for release into Lake Roosevelt and 1.4 million kokanee fry for Banks Lake annually. In 2005, the annual release goal included 3.3 million kokanee fry, 475,000 kokanee yearlings and 500,000 rainbow trout yearlings. Fish produced by this project in 2005 to meet collective fish production and release goals included: 3,446,438 kokanee fingerlings, 347,730 rainbow trout fingerlings and 525,721 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Meadow Creek and Lake Whatcom kokanee, diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and

  9. Final Environmental Assessment (EA) for Headquarters Building Construction and Main Gate Reconfiguration White Bluff, Spokane, Washington

    Science.gov (United States)

    2012-12-01

    in 1954 and operated as Army Nike Missile Control Site until 1963. It was then converted to a USAF satellite operations center operated by USAF...Source Study: Spokane Satellite Tracking Office. Prepared for US Army Corps of Engineers by Adams and Clark, Inc ., Spokane, WA. Archaeological and

  10. Metropolitan Spokane Region Water Resources Study. Appendix E. Environment and Recreation

    Science.gov (United States)

    1976-01-01

    at Porcupine Bay, maintains a small but productive fishery for walleye pike and large mouth bass. The principal fishery is for walleye pike which takes...elevations. The whitetail deer of the Spokane area are part of the Coeur d’Alene herd . They favor the lower elevations and adapt very well to the river

  11. 40 CFR 1068.360 - What restrictions apply to assigning a model year to imported engines and equipment?

    Science.gov (United States)

    2010-07-01

    ... new engine identified as a 2007 model-year product that is imported on January 31, 2010 will be... equipment? This section includes limitations on assigning a model year to engines and equipment that are imported in a year later than the model year in which they were manufactured, except as specified in...

  12. Spokane Tribal Hatchery, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peone, Tim L. (Spokane Tribe of Indians, Wellpinit, WA)

    2005-03-01

    Due to the construction and operation of Grand Coulee Dam (1939), anadromous salmon have been eradicated and resident fish populations permanently altered in the upper Columbia River region. Federal and private hydropower dam operations throughout the Columbia River system severely limits indigenous fish populations in the upper Columbia. Artificial production has been determined appropriate for supporting a harvestable fishery for kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). A collaborative multi-agency artificial production program for the Lake Roosevelt and Banks Lake fisheries exists consisting of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and the Lake Roosevelt Kokanee and Rainbow Trout Net Pen Rearing Projects. These projects operate complementary of one another to target an annual release of 1 million yearling kokanee and 500,000 yearling rainbow trout for Lake Roosevelt and 1.4 million kokanee fry/fingerlings for Banks Lake. Fish produced by this project in 2004 to meet collective fish production and release goals included: 1,655,722 kokanee fingerlings, 537,783 rainbow trout fingerlings and 507,660 kokanee yearlings. Kokanee yearlings were adipose fin clipped before release. Stock composition consisted of Lake Whatcom kokanee, 50:50 diploid-triploid Spokane Trout Hatchery (McCloud River) rainbow trout and Phalon Lake red-band rainbow trout. All kokanee were marked with either thermal, oxytetracyline or fin clips prior to release. Preliminary 2004 Lake Roosevelt fisheries investigations indicate hatchery/net pen stocking significantly contributed to harvestable rainbow trout and kokanee salmon fisheries. An increase in kokanee harvest was primarily owing to new release strategies. Walleye predation, early maturity and entrainment through Grand Coulee Dam continues to have a negative impact on adult kokanee returns and limits the

  13. 78 FR 2428 - Notice of Intent To Repatriate Cultural Items: Northwest Museum of Arts & Culture, Spokane, WA

    Science.gov (United States)

    2013-01-11

    ... & Culture, also the Eastern Washington State Historical Society, Spokane, WA, that meet the definition of... the Eastern Washington State Historical Society, in consultation with the appropriate Indian tribe, has determined that the cultural items meet the definition of unassociated funerary objects and...

  14. 75 FR 58424 - Notice of Intent to Repatriate Cultural Items: Northwest Museum of Arts & Culture, Spokane, WA

    Science.gov (United States)

    2010-09-24

    ... Museum of Arts & Culture, aka Eastern Washington State Historical Society, Spokane, WA, that meet the definition of unassociated funerary objects under 25 U.S.C. 3001. This notice is published as part of the... Eastern Washington State Historical Society (now Northwest Museum of Arts & Culture), University of...

  15. Notification: EPA Region 10 Management Controls Over Allowing Substantial Public Funds to Construct the Spokane County Wastewater Treatment Facility

    Science.gov (United States)

    January 20, 2012. This EPA's OIG is initiating a review from an OIG hotline complaint regarding whether federal funds were properly used to construct the new Spokane County wastewater treatment facility in accordance with 40 CFR 35, Subpart K.

  16. Outcomes of senior reach gatekeeper referrals: comparison of the Spokane gatekeeper program, Colorado Senior Reach, and Mid-Kansas Senior Outreach.

    Science.gov (United States)

    Bartsch, David A; Rodgers, Vicki K; Strong, Don

    2013-01-01

    Outcomes of older adults referred for care management and mental health services through the senior reach gatekeeper model of case finding were examined in this study and compared with the Spokane gatekeeper model Colorado Senior Reach and the Mid-Kansas Senior Outreach (MKSO) programs are the two Senior Reach Gatekeeper programs modeled after the Spokane program, employing the same community education and gatekeeper model and with mental health treatment for elderly adults in need of support. The three mature programs were compared on seniors served isolation, and depression ratings. Nontraditional community gatekeepers were trained and referred seniors in need. Findings indicate that individuals served by the two Senior Reach Gatekeeper programs demonstrated significant improvements. Isolation indicators such as social isolation decreased and depression symptoms and suicide ideation also decreased. These findings for two Senior Reach Gatekeeper programs demonstrate that the gatekeeper approach to training community partners worked in referring at-risk seniors in need in meeting their needs, and in having a positive impact on their lives.

  17. Response of ponderosa pine stands to pre-commercial thinning on Nez Perce and Spokane Tribal forests in the Inland Northwest, USA

    Science.gov (United States)

    Dennis E. Ferguson; John C. Byrne; William R. Wykoff; Brian Kummet; Ted Hensold

    2011-01-01

    Stands of dense, natural ponderosa pine (Pinus ponderosa var. ponderosa) regeneration were operationally, precommercially thinned at seven sites - four on Nez Perce Tribal lands in northern Idaho and three on Spokane Tribal lands in eastern Washington. Five spacing treatments were studied - control (no thinning), 5x5 ft, 7x7 ft, 10x10 ft, and 14x14 ft. Sample trees...

  18. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  19. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  20. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  1. Drawing evaluation report for sampling equipment drawings; TOPICAL

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  2. Radon and remedial action in Spokane River Valley residences: an interim report

    International Nuclear Information System (INIS)

    Turk, B.H.; Prill, R.J.; Fisk, W.J.; Grimsrud, D.T.; Moed, B.A.; Sextro, R.G.

    1986-03-01

    Fifty-six percent of 46 residences monitored in the Spokane River Valley in eastern Washington/northern Idaho have indoor radon concentrations above the National Council for Radiation Protection (NCRP) guidelines of 8 pCi/1. Indoor levels were over 20 pCi/1 in eight homes, and ranged up to 132 pCi/1 in one house. Radon concentrations declined by factors of 4 to 38 during summer months. Measurements of soil emanation rates, domestic water supply concentrations, and building material flux rates indicate that diffusion of radon does not significantly contribute to the high concentrations observed. Rather, radon entry is dominated by pressure-driven bulk soil gas transport, aggravated by the local subsurface soil composition and structure. A variety of radon control strategies are being evaluated in 14 of these homes. Sub-surface ventilation by depressurization and overpressurization, basement overpressurization, and crawlspace ventilation are capable of successfully reducing radon levels below 5 pCi/1 in these homes. House ventilation is appropriate in buildings with low-moderate concentrations, while sealing of cracks has been relatively ineffective

  3. 7 CFR 1437.104 - Assigned production.

    Science.gov (United States)

    2010-01-01

    ...) Irrigation equipment is not capable of supplying adequate water to sustain the expected production of a... practice is not used. (7) For normal irrigated annual and biennial crops, the supply of available water at... determining losses under this section, assigned production will be used to offset the loss of production when...

  4. Technology transfer equipment qualification methodology for shelf life determination

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1995-01-01

    Discussions with a number of Nuclear Utilities revealed that equipment qualified for 10 to 40 years in the harsh environment of the plant was being assigned shelf lives of only 5 to 10 years in the benign environment of the warehouse, and then the materials were being trashed. One safety-related equipment supplier was assigning a 10-year qualified life, from date of shipment, with no recognition of the difference in the aging rate in the plant vs. that in the warehouse. Many suppliers assign shelf lives based on product warranty considerations rather than actual product degradation. An EPRI program was initiated to evaluate the methods used to assign shelf lives and to adapt the Arrhenius methodology, used in equipment qualification, to assign technically justifiable shelf lives. Temperature is the main factor controlling shelf life; however, atmospheric pressure, humidity, ultraviolet light, ozone and other atmospheric contaminants were also considered. A list of 70 representative materials was addressed in the program. All of these were found to have shelf lives of 14 years to greater than 60 years, except for 19 items. For 18 of these items, there was no data available except for the manufacturer's recommendation

  5. 47 CFR 69.306 - Central office equipment (COE).

    Science.gov (United States)

    2010-10-01

    ... that any Central office equipment attributable to local transport shall be assigned to the Transport... Information and Transport access elements based on the remaining combined investment in COE Category 1... equipment for purposes of the Modification of Final Judgment in United States v. Western Electric Co. shall...

  6. Sources, transport, and trends for selected trace metals and nutrients in the Coeur d'Alene and Spokane River Basins, Idaho, 1990-2013

    Science.gov (United States)

    Clark, Gregory M.; Mebane, Christopher A.

    2014-01-01

    Data collected at 18 streamflow-gaging and water-quality sampling sites in the Coeur d’Alene and Spokane River Basins of northern Idaho were used to estimate mean streamflow‑weighted concentrations and annual loads of total and dissolved cadmium, lead, and zinc, and total phosphorus (TP) and nitrogen (TN) for water years (WYs) 2009–13. Chronic Ambient Water Quality Criteria (AWQC) and AWQC ratios also were calculated to evaluate Idaho aquatic life criteria for chronic exposure to cadmium and zinc in streams. At four sites with a longer period of record, a Seasonal Kendall trend test was used to assess historical trends in the concentrations of total cadmium, lead, and zinc, and chronic AWQC ratios for cadmium and zinc during WYs 1990–2013.

  7. Business Math without Tears.

    Science.gov (United States)

    Merchant, Ronald

    1980-01-01

    Describes a new course at Spokane Falls Community College which builds on and reviews basic business math and electronic calculator skills. Material is self-paced and includes work with metrics. Discusses student evaluation of the course and type of equipment used. (CT)

  8. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  9. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  10. Selected trace-element and synthetic-organic compound data for streambed sediment from the Clark Fork-Pend Oreille and Spokane River basins, Montana, Idaho, and Washington, 1998

    Science.gov (United States)

    Beckwith, Michael A.

    2002-01-01

    Streambed-sediment samples were collected at 22 sites during the summer of 1998 as part of the U.S. Geological Survey National Water-Quality Assessment Program. Sampling sites in the Clark Fork-Pend Oreille and Spokane River basins represented a wide range of environmental conditions including pristine mountain streams and large rivers affected by mining-related and urban activities. Samples were analyzed for 45 inorganic major and trace elements, 109 syn­thetic organic compounds, and carbon. This report pre­sents the selected results of streambed-sediment sampling from the Clark Fork-Pend Oreille and Spo­kane River basins in Montana, Idaho, and Washington.

  11. 42 CFR 23.4 - How must an entity apply for assignment?

    Science.gov (United States)

    2010-10-01

    ... applicant's overall organizational structure; (2) A justification of the request for the assignment of personnel based upon the needs of the health manpower shortage area; (3) A description of the applicant's..., equipment and supplies; (4) A list of the proposed fees and discounted fees to be charged for the provision...

  12. 49 CFR 1242.24 - Shop buildings-other equipment (account XX-19-26).

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Shop buildings-other equipment (account XX-19-26). 1242.24 Section 1242.24 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... Structures § 1242.24 Shop buildings—other equipment (account XX-19-26). Assign directly to freight (or as...

  13. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  14. Flow Oriented Channel Assignment for Multi-radio Wireless Mesh Networks

    Directory of Open Access Journals (Sweden)

    Niu Zhisheng

    2010-01-01

    Full Text Available We investigate channel assignment for a multichannel wireless mesh network backbone, where each router is equipped with multiple interfaces. Of particular interest is the development of channel assignment heuristics for multiple flows. We present an optimization formulation and then propose two iterative flow oriented heuristics for the conflict-free and interference-aware cases, respectively. To maximize the aggregate useful end-to-end flow rates, both algorithms identify and resolve congestion at instantaneous bottleneck link in each iteration. Then the link rate is optimally allocated among contending flows that share this link by solving a linear programming (LP problem. A thorough performance evaluation is undertaken as a function of the number of channels and interfaces/node and the number of contending flows. The performance of our algorithm is shown to be significantly superior to best known algorithm in its class in multichannel limited radio scenarios.

  15. Implementation of an agile maintenance mechanic assignment methodology

    Science.gov (United States)

    Jimenez, Jesus A.; Quintana, Rolando

    2000-10-01

    The objective of this research was to develop a decision support system (DSS) to study the impact of introducing new equipment into a medical apparel plant from a maintenance organizational structure perspective. This system will enable the company to determine if their capacity is sufficient to meet current maintenance challenges. The DSS contains two database sets that describe equipment and maintenance resource profiles. The equipment profile specifies data such as mean time to failures, mean time to repairs, and minimum mechanic skill level required to fix each machine group. Similarly, maintenance-resource profile reports information about the mechanic staff, such as number and type of certifications received, education level, and experience. The DSS will then use this information to minimize machine downtime by assigning the highest skilled mechanics to machines with higher complexity and product value. A modified version of the simplex method, the transportation problem, was used to perform the optimization. The DSS was built using the Visual Basic for Applications (VBA) language contained in the Microsoft Excel environment. A case study was developed from current existing data. The analysis consisted of forty-two machine groups and six mechanic categories with ten skill levels. Results showed that only 56% of the mechanic workforce was utilized. Thus, the company had available resources for meeting future maintenance requirements.

  16. Development of an approach to facilitate optimal equipment replacement : technical summary.

    Science.gov (United States)

    1999-10-01

    The objective of the study was to determine a way or ways to assign an urgency rating to equipment that was currently in service but in need of replacement. This urgency rating must in some manner took into account the various costs associated with r...

  17. Protein secondary structure assignment revisited: a detailed analysis of different assignment methods

    Directory of Open Access Journals (Sweden)

    de Brevern Alexandre G

    2005-09-01

    Full Text Available Abstract Background A number of methods are now available to perform automatic assignment of periodic secondary structures from atomic coordinates, based on different characteristics of the secondary structures. In general these methods exhibit a broad consensus as to the location of most helix and strand core segments in protein structures. However the termini of the segments are often ill-defined and it is difficult to decide unambiguously which residues at the edge of the segments have to be included. In addition, there is a "twilight zone" where secondary structure segments depart significantly from the idealized models of Pauling and Corey. For these segments, one has to decide whether the observed structural variations are merely distorsions or whether they constitute a break in the secondary structure. Methods To address these problems, we have developed a method for secondary structure assignment, called KAKSI. Assignments made by KAKSI are compared with assignments given by DSSP, STRIDE, XTLSSTR, PSEA and SECSTR, as well as secondary structures found in PDB files, on 4 datasets (X-ray structures with different resolution range, NMR structures. Results A detailed comparison of KAKSI assignments with those of STRIDE and PSEA reveals that KAKSI assigns slightly longer helices and strands than STRIDE in case of one-to-one correspondence between the segments. However, KAKSI tends also to favor the assignment of several short helices when STRIDE and PSEA assign longer, kinked, helices. Helices assigned by KAKSI have geometrical characteristics close to those described in the PDB. They are more linear than helices assigned by other methods. The same tendency to split long segments is observed for strands, although less systematically. We present a number of cases of secondary structure assignments that illustrate this behavior. Conclusion Our method provides valuable assignments which favor the regularity of secondary structure segments.

  18. Using a digital storytelling assignment to teach public health advocacy.

    Science.gov (United States)

    de Castro, A B; Levesque, Salem

    2018-03-01

    The need and expectation for advocacy is central to public health nursing practice. Advocacy efforts that effectively call attention to population health threats and promote the well-being of communities rely on strategies that deliver influential messaging. The digital story is a lay method to capture meaningful, impactful stories that can be used to advocate for public health concerns. Readily available, user-friendly digital technologies allow engagement in digital media production to create digital stories. This paper describes how digital story making can be utilized as an academic assignment to teach public health advocacy within an undergraduate nursing curriculum. Providing nursing students this artistic outlet can facilitate meeting academic learning goals, while also equipping them with creative skills that can be applied in future professional practice. Nursing educators can take advantage of institutional resources and campus culture to support the use of novel digital media assignments that facilitate application of advocacy concepts. © 2017 Wiley Periodicals, Inc.

  19. Minimum Interference Channel Assignment Algorithm for Multicast in a Wireless Mesh Network

    Directory of Open Access Journals (Sweden)

    Sangil Choi

    2016-12-01

    Full Text Available Wireless mesh networks (WMNs have been considered as one of the key technologies for the configuration of wireless machines since they emerged. In a WMN, wireless routers provide multi-hop wireless connectivity between hosts in the network and also allow them to access the Internet via gateway devices. Wireless routers are typically equipped with multiple radios operating on different channels to increase network throughput. Multicast is a form of communication that delivers data from a source to a set of destinations simultaneously. It is used in a number of applications, such as distributed games, distance education, and video conferencing. In this study, we address a channel assignment problem for multicast in multi-radio multi-channel WMNs. In a multi-radio multi-channel WMN, two nearby nodes will interfere with each other and cause a throughput decrease when they transmit on the same channel. Thus, an important goal for multicast channel assignment is to reduce the interference among networked devices. We have developed a minimum interference channel assignment (MICA algorithm for multicast that accurately models the interference relationship between pairs of multicast tree nodes using the concept of the interference factor and assigns channels to tree nodes to minimize interference within the multicast tree. Simulation results show that MICA achieves higher throughput and lower end-to-end packet delay compared with an existing channel assignment algorithm named multi-channel multicast (MCM. In addition, MICA achieves much lower throughput variation among the destination nodes than MCM.

  20. 76 FR 79755 - First Meeting: RTCA Special Committee 226 Audio Systems and Equipment

    Science.gov (United States)

    2011-12-22

    ... Administrative Remarks Introductions RTCA Overview Audio Systems and Equipment--Background and History Agenda..., Discussion, Recommendations and Assignment of Responsibilities Other Business Establish Agenda for Next..., Manager, Business Operations Branch, Federal Aviation Administration. [FR Doc. 2011-32863 Filed 12-21-11...

  1. Grouping puts figure-ground assignment in context by constraining propagation of edge assignment.

    Science.gov (United States)

    Brooks, Joseph L; Brook, Joseph L; Driver, Jon

    2010-05-01

    Figure-ground organization involves the assignment of edges to a figural shape on one or the other side of each dividing edge. Established visual cues for edge assignment primarily concern relatively local rather than contextual factors. In the present article, we show that an assignment for a locally unbiased edge can be affected by an assignment of a remote contextual edge that has its own locally biased assignment. We find that such propagation of edge assignment from the biased remote context occurs only when the biased and unbiased edges are grouped. This new principle, whereby grouping constrains the propagation of figural edge assignment, emerges from both subjective reports and an objective short-term edge-matching task. It generalizes from moving displays involving grouping by common fate and collinearity, to static displays with grouping by similarity of edge-contrast polarity, or apparent occlusion. Our results identify a new contextual influence on edge assignment. They also identify a new mechanistic relation between grouping and figure-ground processes, whereby grouping between remote elements can constrain the propagation of edge assignment between those elements. Supplemental materials for this article may be downloaded from http://app.psychonomic-journals.org/content/supplemental.

  2. FLEET ASSIGNMENT MODELLING

    Directory of Open Access Journals (Sweden)

    2016-01-01

    Full Text Available The article is devoted to the airline scheduling process and methods of its modeling. This article describes the main stages of airline scheduling process (scheduling, fleet assignment, revenue management, operations, their features and interactions. The main part of scheduling process is fleet assignment. The optimal solution of the fleet assignment problem enables airlines to increase their incomes up to 3 % due to quality improving of connections and execution of the planned number of flights operated by less number of aircraft than usual or planned earlier. Fleet assignment of scheduling process is examined and Conventional Leg-Based Fleet Assignment Model is analyzed. Finally strong and weak aspects of the model (SWOT are released and applied. The article gives a critical analysis of FAM model, with the purpose of identi- fying possible options and constraints of its use (for example, in cases of short-term and long-term planning, changing the schedule or replacing the aircraft, as well as possible ways to improve the model.

  3. Effects of Long-Term Developmental Patterns of Adiposity on Levels of C-Reactive Protein and Fibrinogen among North-American Men and Women: The Spokane Heart Study

    Directory of Open Access Journals (Sweden)

    Trynke Hoekstra

    2014-06-01

    Full Text Available This study examined the heterogeneity in BMI development by identifying distinct developmental trajectories. These trajectories were further investigated by relating them to markers of low-grade inflammation later in life. Data from approximately 400 healthy volunteers participating in the Spokane Heart Study were collected in 2-year intervals, and four waves of data were available for the current analyses. Body weight was measured by BMI and low-grade inflammation by high-sensitivity C-reactive protein (CRP and fibrinogen. Up to date statistical techniques, i.e. latent class growth models, were used to analyse heterogeneity in body weight, and linear regressions were run to analyse possible associations between trajectories of body weight and CRP/fibrinogen levels. Six trajectories were identified (three stable, two increasing, and one decreasing which differed significantly on CRP/fibrinogen levels, highlighting the importance of weight trajectories. The differences were only partly explained by variations in lifestyle habits.

  4. 42 CFR 23.11 - Under what circumstances may the Secretary sell equipment or other property of the United States...

    Science.gov (United States)

    2010-10-01

    ... the assigned personnel. The equipment may be sold at the fair market value or less than the fair... Secretary determines that an entity is unable to pay the fair market value. In determining whether an entity is financially unable to purchase equipment or property at fair market value, the Secretary will...

  5. UOP LDR 300 All Assignments New

    OpenAIRE

    ADMIN

    2018-01-01

    UOP LDR 300 All Assignments New Check this A+ tutorial guideline at http://www.ldr300assignment.com/ldr-300-uop/ldr-300-all-assignments-latest For more classes visit http://www.ldr300assignment.com LDR 300 Week 1 Assignment Leadership Assessment (2 Papers) LDR 300 Week 2 Assignment Leadership Theories Matrix (2 Set) LDR 300 Week 2 Assignment Formulating Leadership Part I (2 Papers) LDR 300 Week 3 Assignment Interaction and Influence Amo...

  6. Fair Package Assignment

    Science.gov (United States)

    Lahaie, Sébastien; Parkes, David C.

    We consider the problem of fair allocation in the package assignment model, where a set of indivisible items, held by single seller, must be efficiently allocated to agents with quasi-linear utilities. A fair assignment is one that is efficient and envy-free. We consider a model where bidders have superadditive valuations, meaning that items are pure complements. Our central result is that core outcomes are fair and even coalition-fair over this domain, while fair distributions may not even exist for general valuations. Of relevance to auction design, we also establish that the core is equivalent to the set of anonymous-price competitive equilibria, and that superadditive valuations are a maximal domain that guarantees the existence of anonymous-price competitive equilibrium. Our results are analogs of core equivalence results for linear prices in the standard assignment model, and for nonlinear, non-anonymous prices in the package assignment model with general valuations.

  7. Plagiarism-Proofing Assignments

    Science.gov (United States)

    Johnson, Doug

    2004-01-01

    Mr. Johnson has discovered that the higher the level of student engagement and creativity, the lower the probability of plagiarism. For teachers who would like to see such desirable results, he describes the characteristics of assignments that are most likely to produce them. Two scenarios of types of assignments that avoid plagiarism are…

  8. Evaluating evapotranspiration for six sites in Benton, Spokane, and Yakima counties, Washington, May 1990 to September 1992

    Science.gov (United States)

    Tomlinson, S.A.

    1996-01-01

    This report evaluates evapotranspiration for six sites in Benton, Spokane, and Yakima Counties, Washington. Three sites were located on the Arid Lands Ecology Reserve in Benton County: one at a full-canopy grassland in Snively Basin (Snively Basin site), one at a sparse-canopy grassland adjacent to two weighing lysimeters (grass lysimeter site), and one at a sagebrush grassland adjacent to two weighing lysimeters (sage lysimeter site). Two sites were located on the Turnbull National Wildlife Refuge in Spokane County: one at a full-canopy grassland in a meadow (Turnbull meadow site), the other a full-canopy grassland near a marsh (Turnbull marsh site). The last site was located in a sagebrush grassland in the Black Rock Valley in Yakima County (Black Rock Valley site). The periods of study at the six sites varied, ranging from 5 months at the Black Rock Valley site to more than 2 years at the Snively Basin, grass lysimeter, and sage lysimeter sites. The periods of study were May 1990 to September 1992 for the Snively Basin, grass lysimeter, and sage lysimeter sites; May 1991 to September 1992 for the Turnbull meadow site; May 1991 to April 1992 for the Turnbull marsh site; and March to September 1992 for the Black Rock Valley site. Evapotranspiration and energy-budget fluxes were estimated for the Snively Basin site, the Turnbull meadow site, and the Black Rock Valley site using the Bowen-ratio and Penman-Monteith methods. Daily evapotranspiration for the Snively Basin site was also estimated using a deep-percolation model for the Columbia Basin. The Bowen-ratio method and weighing lysimeters were used at the grass and sage lysimeter sites. The Penman-Monteith method was used at the Turnbull marsh site. Daily evapotranspiration at the sites ranged from under 0.2 millimeter during very dry or cold periods to over 4\\x11millimeters after heavy rainfall or during periods of peak transpiration. At all sites, peak evapotranspiration occurred in spring, coinciding with

  9. On Maximizing the Lifetime of Wireless Sensor Networks by Optimally Assigning Energy Supplies

    Science.gov (United States)

    Asorey-Cacheda, Rafael; García-Sánchez, Antonio Javier; García-Sánchez, Felipe; García-Haro, Joan; Gonzalez-Castaño, Francisco Javier

    2013-01-01

    The extension of the network lifetime of Wireless Sensor Networks (WSN) is an important issue that has not been appropriately solved yet. This paper addresses this concern and proposes some techniques to plan an arbitrary WSN. To this end, we suggest a hierarchical network architecture, similar to realistic scenarios, where nodes with renewable energy sources (denoted as primary nodes) carry out most message delivery tasks, and nodes equipped with conventional chemical batteries (denoted as secondary nodes) are those with less communication demands. The key design issue of this network architecture is the development of a new optimization framework to calculate the optimal assignment of renewable energy supplies (primary node assignment) to maximize network lifetime, obtaining the minimum number of energy supplies and their node assignment. We also conduct a second optimization step to additionally minimize the number of packet hops between the source and the sink. In this work, we present an algorithm that approaches the results of the optimization framework, but with much faster execution speed, which is a good alternative for large-scale WSN networks. Finally, the network model, the optimization process and the designed algorithm are further evaluated and validated by means of computer simulation under realistic conditions. The results obtained are discussed comparatively. PMID:23939582

  10. On Maximizing the Lifetime of Wireless Sensor Networks by Optimally Assigning Energy Supplies

    Directory of Open Access Journals (Sweden)

    Francisco Javier González-Castano

    2013-08-01

    Full Text Available The extension of the network lifetime of Wireless Sensor Networks (WSN is an important issue that has not been appropriately solved yet. This paper addresses this concern and proposes some techniques to plan an arbitrary WSN. To this end, we suggest a hierarchical network architecture, similar to realistic scenarios, where nodes with renewable energy sources (denoted as primary nodes carry out most message delivery tasks, and nodes equipped with conventional chemical batteries (denoted as secondary nodes are those with less communication demands. The key design issue of this network architecture is the development of a new optimization framework to calculate the optimal assignment of renewable energy supplies (primary node assignment to maximize network lifetime, obtaining the minimum number of energy supplies and their node assignment. We also conduct a second optimization step to additionally minimize the number of packet hops between the source and the sink. In this work, we present an algorithm that approaches the results of the optimization framework, but with much faster execution speed, which is a good alternative for large-scale WSN networks. Finally, the network model, the optimization process and the designed algorithm are further evaluated and validated by means of computer simulation under realistic conditions. The results obtained are discussed comparatively.

  11. Dynamic Sequence Assignment.

    Science.gov (United States)

    1983-12-01

    D-136 548 DYNAMIIC SEQUENCE ASSIGNMENT(U) ADVANCED INFORMATION AND 1/2 DECISION SYSTEMS MOUNTAIN YIELW CA C A 0 REILLY ET AL. UNCLSSIIED DEC 83 AI/DS...I ADVANCED INFORMATION & DECISION SYSTEMS Mountain View. CA 94040 84 u ,53 V,..’. Unclassified _____ SCURITY CLASSIFICATION OF THIS PAGE REPORT...reviews some important heuristic algorithms developed for fas- ter solution of the sequence assignment problem. 3.1. DINAMIC MOGRAMUNIG FORMULATION FOR

  12. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  13. Using HL7 in hospital staff assignments.

    Science.gov (United States)

    Unluturk, Mehmet S

    2014-02-01

    Hospital staff assignments are the instructions that allocate the hospital staff members to the hospital beds. Currently, hospital administrators make the assignments without accessing the information regarding the occupancy of the hospital beds and the acuity of the patient. As a result, administrators cannot distinguish between occupied and unoccupied beds, and may therefore assign staff to unoccupied beds. This gives rise to uneven and inefficient staff assignments. In this paper, the hospital admission-discharge-transfer (ADT) system is employed both as a data source and an assignment device to create staff assignments. When the patient data is newly added or modified, the ADT system updates the assignment software client with the relevant data. Based on the relevant data, the assignment software client is able to construct staff assignments in a more efficient way. © 2013 Elsevier Ltd. All rights reserved.

  14. Application of risk-based inspection methods for cryogenic equipment

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    Risk-based Inspection (RBI) is widely applied across the world as part of Pressure Equipment Integrity Management, especially in the oil and gas industry, to generally reduce costs compared with time-based approaches and assist in assigning resources to the most critical equipment. One of the challenges in RBI is to apply it for low temperature and cryogenic applications, as there are usually no degradation mechanisms by which to determine a suitable probability of failure in the overall risk assessment. However, the assumptions used for other degradation mechanisms can be adopted to determine, qualitatively and semi-quantitatively, a consequence of failure within the risk assessment. This can assist in providing a consistent basis for the assumptions used in ensuring adequate process safety barriers and determining suitable sizing of relief devices. This presentation will discuss risk-based inspection in the context of cryogenic safety, as well as present some of the considerations for the risk assessme...

  15. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  16. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  17. Investments for medical equipment in a mother and child health hospital: correlation with level of services/departments.

    Science.gov (United States)

    Trevisanuto, Daniele; Raggi, Roberto; Bavuusuren, Bayasgalantai; Tudevdorj, Erkhembaatar; Doglioni, Nicoletta; Zanardo, Vincenzo

    2011-02-01

    To assess whether investments for medical equipments assigned by a team of experts to a mother and child health hospital located in Mongolia were correlated with structural, organizational, and educational level of its services/departments. A score was used for evaluating the level of each service/department. It was based on a 'structural area' and an 'organizational and educational area'. Destination of funds was determined by a team of experts in collaboration with the head of the service/department. Thirty-three of 36 services/departments (91.6%) were evaluated. A total sum of 4,432,140 Euros to invest in medical equipment was estimated. Assigned investments were inversely correlated with the total (structural plus organizational and educational area) score (n = 33; r =  -0.59; p = 0.0002), and the specific scores for structural area (n = 33; r = -0.46; p = 0.005) and organizational and educational area (n = 33; r =  -0.56; p = 0.0006). A large part of the funds for medical equipment was destined to services/departments with low organizational and educational conditions, limiting the potential effect of the aid meanwhile supporting the most in need departments. Educational efforts and monitoring of specific long-term indicators are mandatory.

  18. A note on ranking assignments using reoptimization

    DEFF Research Database (Denmark)

    Pedersen, Christian Roed; Nielsen, L.R.; Andersen, K.A.

    2005-01-01

    We consider the problem of ranking assignments according to cost in the classical linear assignment problem. An algorithm partitioning the set of possible assignments, as suggested by Murty, is presented where, for each partition, the optimal assignment is calculated using a new reoptimization...

  19. Competitive Traffic Assignment in Road Networks

    Directory of Open Access Journals (Sweden)

    Krylatov Alexander Y.

    2016-09-01

    Full Text Available Recently in-vehicle route guidance and information systems are rapidly developing. Such systems are expected to reduce congestion in an urban traffic area. This social benefit is believed to be reached by imposing the route choices on the network users that lead to the system optimum traffic assignment. However, guidance service could be offered by different competitive business companies. Then route choices of different mutually independent groups of users may reject traffic assignment from the system optimum state. In this paper, a game theoretic approach is shown to be very efficient to formalize competitive traffic assignment problem with various groups of users in the form of non-cooperative network game with the Nash equilibrium search. The relationships between the Wardrop’s system optimum associated with the traffic assignment problem and the Nash equilibrium associated with the competitive traffic assignment problem are investigated. Moreover, some related aspects of the Nash equilibrium and the Wardrop’s user equilibrium assignments are also discussed.

  20. Assessment of the performance of containment and surveillance equipment part 2: trial application

    International Nuclear Information System (INIS)

    Rezniczek, A.; Richter, B.; Jussofie, A.

    2009-01-01

    The adopted methodological approach for assessing the performance of Containment and Surveillance (C/S) equipment resulted from an account of work performed for and in cooperation with the ESARDA Working Group on C/S. It was applied on a trial basis to a dry storage facility for spent nuclear fuel and consisted of the following steps: (1) Acquisition and analysis of design information and operational characteristics of the facility under consideration, (2) assumptions on diversion and misuse scenarios, (3) assumptions on safeguards approach and definition of safeguards requirements, (4) compilation and characterisation of candidate C/S equipment, (5) performance assessment of C/S equipment. The candidate equipment taken into account was routinely used by the IAEA: DCM14-type camera, Type E capand- wire seal, COBRA fibre optic seal, and VACOSS electronic seal. Four applications were considered: camera mounted in the reception area, seal on secondary lid of transport and storage cask, seal on protective lid, and seal on group of casks. For these applications, requirements were defined and requirement levels were attributed. The assignment of performance levels was carried out by using the technical specifications and design basis tolerances provided by the equipment manufacturers. The results were entered into four performance assessment tables. Although the assessment methodology was not yet fully developed, its trial application yielded promising results with regard to the selection of appropriate C/S equipment.

  1. Real life working shift assignment problem

    Science.gov (United States)

    Sze, San-Nah; Kwek, Yeek-Ling; Tiong, Wei-King; Chiew, Kang-Leng

    2017-07-01

    This study concerns about the working shift assignment in an outlet of Supermarket X in Eastern Mall, Kuching. The working shift assignment needs to be solved at least once in every month. Current approval process of working shifts is too troublesome and time-consuming. Furthermore, the management staff cannot have an overview of manpower and working shift schedule. Thus, the aim of this study is to develop working shift assignment simulation and propose a working shift assignment solution. The main objective for this study is to fulfill manpower demand at minimum operation cost. Besides, the day off and meal break policy should be fulfilled accordingly. Demand based heuristic is proposed to assign working shift and the quality of the solution is evaluated by using the real data.

  2. 24 CFR 221.770 - Assignment option.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Assignment option. 221.770 Section... § 221.770 Assignment option. A mortgagee holding a conditional or firm commitment issued on or before... mortgagee's approved underwriter on or before November 30, 1983) has the option to assign, transfer and...

  3. Job Assignments under Moral Hazard

    DEFF Research Database (Denmark)

    Koch, Alexander; Nafziger, Julia

    Inefficient job assignments are usually explained with incomplete information about employees' abilities or contractual imperfections. We show that inefficient assignments arise even without uncertainty about the employee's ability and with complete contracts. Building on this result we provide...

  4. EZ-ASSIGN, a program for exhaustive NMR chemical shift assignments of large proteins from complete or incomplete triple-resonance data

    Energy Technology Data Exchange (ETDEWEB)

    Zuiderweg, Erik R. P., E-mail: zuiderwe@umich.edu; Bagai, Ireena [The University of Michigan Medical School, Department of Biological Chemistry (United States); Rossi, Paolo [Rutgers University, Center for Integrative Proteomics Research (United States); Bertelsen, Eric B. [Arbor Communications, Inc. (United States)

    2013-10-15

    For several of the proteins in the BioMagResBank larger than 200 residues, 60 % or fewer of the backbone resonances were assigned. But how reliable are those assignments? In contrast to complete assignments, where it is possible to check whether every triple-resonance Generalized Spin System (GSS) is assigned once and only once, with incomplete data one should compare all possible assignments and pick the best one. But that is not feasible: For example, for 200 residues and an incomplete set of 100 GSS, there are 1.6 Multiplication-Sign 10{sup 260} possible assignments. In 'EZ-ASSIGN', the protein sequence is divided in smaller unique fragments. Combined with intelligent search approaches, an exhaustive comparison of all possible assignments is now feasible using a laptop computer. The program was tested with experimental data of a 388-residue domain of the Hsp70 chaperone protein DnaK and for a 351-residue domain of a type III secretion ATPase. EZ-ASSIGN reproduced the hand assignments. It did slightly better than the computer program PINE (Bahrami et al. in PLoS Comput Biol 5(3):e1000307, 2009) and significantly outperformed SAGA (Crippen et al. in J Biomol NMR 46:281-298, 2010), AUTOASSIGN (Zimmerman et al. in J Mol Biol 269:592-610, 1997), and IBIS (Hyberts and Wagner in J Biomol NMR 26:335-344, 2003). Next, EZ-ASSIGN was used to investigate how well NMR data of decreasing completeness can be assigned. We found that the program could confidently assign fragments in very incomplete data. Here, EZ-ASSIGN dramatically outperformed all the other assignment programs tested.

  5. 24 CFR 221.255 - Assignment option.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Assignment option. 221.255 Section... Assignment option. (a) A mortgagee holding a mortgage insured pursuant to a conditional or firm commitment issued on or before November 30, 1983 has the option to assign, transfer and deliver to the Commissioner...

  6. An algorithm for ranking assignments using reoptimization

    DEFF Research Database (Denmark)

    Pedersen, Christian Roed; Nielsen, Lars Relund; Andersen, Kim Allan

    2008-01-01

    We consider the problem of ranking assignments according to cost in the classical linear assignment problem. An algorithm partitioning the set of possible assignments, as suggested by Murty, is presented where, for each partition, the optimal assignment is calculated using a new reoptimization...... technique. Computational results for the new algorithm are presented...

  7. 48 CFR 42.602 - Assignment and location.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Assignment and location... Assignment and location. (a) A CACO may be assigned only when (1) the contractor has at least two locations..., or a full-time CACO may be assigned. In determining the location of the CACO, the responsible agency...

  8. EZ-ASSIGN, a program for exhaustive NMR chemical shift assignments of large proteins from complete or incomplete triple-resonance data

    International Nuclear Information System (INIS)

    Zuiderweg, Erik R. P.; Bagai, Ireena; Rossi, Paolo; Bertelsen, Eric B.

    2013-01-01

    For several of the proteins in the BioMagResBank larger than 200 residues, 60 % or fewer of the backbone resonances were assigned. But how reliable are those assignments? In contrast to complete assignments, where it is possible to check whether every triple-resonance Generalized Spin System (GSS) is assigned once and only once, with incomplete data one should compare all possible assignments and pick the best one. But that is not feasible: For example, for 200 residues and an incomplete set of 100 GSS, there are 1.6 × 10 260 possible assignments. In “EZ-ASSIGN”, the protein sequence is divided in smaller unique fragments. Combined with intelligent search approaches, an exhaustive comparison of all possible assignments is now feasible using a laptop computer. The program was tested with experimental data of a 388-residue domain of the Hsp70 chaperone protein DnaK and for a 351-residue domain of a type III secretion ATPase. EZ-ASSIGN reproduced the hand assignments. It did slightly better than the computer program PINE (Bahrami et al. in PLoS Comput Biol 5(3):e1000307, 2009) and significantly outperformed SAGA (Crippen et al. in J Biomol NMR 46:281–298, 2010), AUTOASSIGN (Zimmerman et al. in J Mol Biol 269:592–610, 1997), and IBIS (Hyberts and Wagner in J Biomol NMR 26:335–344, 2003). Next, EZ-ASSIGN was used to investigate how well NMR data of decreasing completeness can be assigned. We found that the program could confidently assign fragments in very incomplete data. Here, EZ-ASSIGN dramatically outperformed all the other assignment programs tested

  9. Traffic Route Modelling and Assignment with Intelligent Transport System

    Directory of Open Access Journals (Sweden)

    Kunicina Nadezhda

    2014-12-01

    Full Text Available The development of signal transmitting environment for multimodal traffic control will enhance the integration of emergency and specialized transport routing tools in usual traffic control paradigms - it is one of the opportunities offered by modern intelligent traffic control systems. The improvement of effective electric power use in public transport system is an advantage of Intelligent Transport System (ITS. The research is connected with the improvement of on-line traffic control and adaptation of special traffic lighting alternatives by ITS. The assignment of the nearest appropriate transport will be done by passenger request, but unlike information system, the transport planning is done on demand. The task can be solved with the help of modern technical methods and equipment, as well as by applying control paradigms of the distributed systems. The problem is solved with the help of calculations hyper-graph and scheduling theory. The goal of the research is to develop methods, which support scheduling of the emergency transport, using high performance computing.

  10. Exogenous spatial attention influences figure-ground assignment.

    Science.gov (United States)

    Vecera, Shaun P; Flevaris, Anastasia V; Filapek, Joseph C

    2004-01-01

    In a hierarchical stage account of vision, figure-ground assignment is thought to be completed before the operation of focal spatial attention. Results of previous studies have supported this account by showing that unpredictive, exogenous spatial precues do not influence figure-ground assignment, although voluntary attention can influence figure-ground assignment. However, in these studies, attention was not summoned directly to a region in a figure-ground display. In three experiments, we addressed the relationship between figure-ground assignment and visuospatial attention. In Experiment 1, we replicated the finding that exogenous precues do not influence figure-ground assignment when they direct attention outside of a figure-ground stimulus. In Experiment 2, we demonstrated that exogenous attention can influence figure-ground assignment if it is directed to one of the regions in a figure-ground stimulus. In Experiment 3, we demonstrated that exogenous attention can influence figure-ground assignment in displays that contain a Gestalt figure-ground cue; this result suggests that figure-ground processes are not entirely completed prior to the operation of focal spatial attention. Exogenous spatial attention acts as a cue for figure-ground assignment and can affect the outcome of figure-ground processes.

  11. US DOE Radiological Assistance Program: personnel, equipment and resources

    International Nuclear Information System (INIS)

    Hull, A.P.; Kuehner, A.V.; Phillips, L.F.

    1982-01-01

    The Radiological Assistance Program (RAP) of the US Department of Energy (DOE) is intended to provide emergency advice and assistance in the event of radiological incidents. Each of DOE's eight Regional Coordinating Offices in the US provide a 24-hour reporting and response capability. Specifically, the Brookhaven Area Office (BHO) is responsible for DOE's Region I, which includes the 11 northeastern states of the US. Although an inventory of dedicated equipment is assigned to BHO-RAP, it draws upon the resources of Brookhaven National Laboratory (BNL) for trained personnel in health physics and for other specialized personnel in both the day to day operation of the program and in the on-the-scene response to an incident. The organization of the BHO-RAP program and its response procedures are described in detail. An inventory and brief description of the contents of a variety of emergency equipment kits and of additional state-of-the-art instruments is included. The BHO-RAP guidelines and requirements for field operations are also indicated, as are other DOE resources upon which it can draw

  12. WebAssign: Assessing Your Students' Understanding Continuously

    Science.gov (United States)

    Risley, John S.

    1999-11-01

    Motivating students to learn is a constant challenge for faculty. Technology can play a significant role. One such solution is WebAssign — a web-based homework system that offers new teaching and learning opportunities for educators and their students. WebAssign delivers, collects, grades, and records customized homework assignments over the Internet. Students get immediate feedback with credit and instructors can implement "Just-in-Time" teaching. In this talk, I will describe how assignments can be generated with different numerical values for each question, giving each student a unique problem to solve. This feature encourages independent thinking with the benefit of collaborative learning. Example assignments taken from textbook questions and intellectually engaging Java applet simulations will be shown. Studies and first-hand experience on the educational impact of using WebAssign will also be discussed.

  13. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  14. Solving the rectangular assignment problem and applications

    NARCIS (Netherlands)

    Bijsterbosch, J.; Volgenant, A.

    2010-01-01

    The rectangular assignment problem is a generalization of the linear assignment problem (LAP): one wants to assign a number of persons to a smaller number of jobs, minimizing the total corresponding costs. Applications are, e.g., in the fields of object recognition and scheduling. Further, we show

  15. 7 CFR 900.106 - Assignment of mediator.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Assignment of mediator. 900.106 Section 900.106 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... Assignment of mediator. The Director of the Division shall assign a mediator, from the group designated by...

  16. My Favorite Assignment.

    Science.gov (United States)

    ABCA Bulletin, 1983

    1983-01-01

    Describes three assignments for enticing business communication students to undertake library research: an analysis of a Fortune 500 company, a career choice report, and a report on an organization that offers potential employment. (AEA)

  17. Critical review of the equipment hatch of a large dry steel containment. The DEFENDER IMPROVEMENT

    International Nuclear Information System (INIS)

    Mantega, F.; Penno, E.; Vanini, P.

    1994-01-01

    Performances of the Containment System under Severe Accident conditions depend on a number of different features and components. The equipment hatch may be considered a critical component because it is a potential main contributor to the total Containment leak rate during a Severe accident and a potential (depending on the design) direct leak path between the containment atmosphere and the environment. The analytical study performed to anticipate the response of the equipment hatch of a large dry steel containment under Severe Accident condition has pointed out some questions of concern. The possible leak tightness failure mechanism are related to: the gaskets elastic characteristics degradation due to thermal and radiological aging; the deformation of the hatch sleeve induced by the containment wall; and the differential expansion between gasket material and steel. Beside, the equipment hatch may be considered a single barrier and although it is equipped with two gaskets, it is not difficult to demonstrate that a backup function cannot be assigned to the external gasket. For these reason it seems to be necessary to realize a wider application of the 'Defence in Depth' criteria in the design of this component. The DEFENDER (DEFENce in Depth Equipment hatch Requalification) might be a solution to increase the margin of safety of the equipment hatch under the Severe Accident condition. (author)

  18. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  19. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  20. Managing voluntary turnover through challenging assignments

    NARCIS (Netherlands)

    Preenen, P.T.Y.; de Pater, I.E.; van Vianen, A.E.M.; Keijzer, L.

    2011-01-01

    This study examines employees’ challenging assignments as manageable means to reduce turnover intentions, job search behaviors, and voluntary turnover. Results indicate that challenging assignments are negatively related to turnover intentions and job search behaviors and that these relationships

  1. Managing voluntary turnover through challenging assignments

    NARCIS (Netherlands)

    Preenen, P.T.Y.; Pater, I.E. de; Vianen, A.E.M. van; Keijzer, L.

    2011-01-01

    This study examines employees' challenging assignments as manageable means to reduce turnover intentions, job search behaviors, and voluntary turnover. Results indicate that challenging assignments are negatively related to turnover intentions and job search behaviors and that these relationships

  2. Scaffolding students’ assignments

    DEFF Research Database (Denmark)

    Slot, Marie Falkesgaard

    2013-01-01

    This article discusses scaffolding in typical student assignments in mother tongue learning materials in upper secondary education in Denmark and the United Kingdom. It has been determined that assignments do not have sufficient scaffolding end features to help pupils understand concepts and build...... objects. The article presents the results of empirical research on tasks given in Danish and British learning materials. This work is based on a further development of my PhD thesis: “Learning materials in the subject of Danish” (Slot 2010). The main focus is how cognitive models (and subsidiary explicit...... learning goals) can help students structure their argumentative and communica-tive learning processes, and how various multimodal representations can give more open-ended learning possibilities for collaboration. The article presents a short introduction of the skills for 21st century learning and defines...

  3. Mars - robust automatic backbone assignment of proteins

    International Nuclear Information System (INIS)

    Jung, Young-Sang; Zweckstetter, Markus

    2004-01-01

    MARS a program for robust automatic backbone assignment of 13 C/ 15 N labeled proteins is presented. MARS does not require tight thresholds for establishing sequential connectivity or detailed adjustment of these thresholds and it can work with a wide variety of NMR experiments. Using only 13 C α / 13 C β connectivity information, MARS allows automatic, error-free assignment of 96% of the 370-residue maltose-binding protein. MARS can successfully be used when data are missing for a substantial portion of residues or for proteins with very high chemical shift degeneracy such as partially or fully unfolded proteins. Other sources of information, such as residue specific information or known assignments from a homologues protein, can be included into the assignment process. MARS exports its result in SPARKY format. This allows visual validation and integration of automated and manual assignment

  4. Assignment of element and isotope factors

    International Nuclear Information System (INIS)

    Schneider, R.A.

    1984-01-01

    Element and isotope factors are assigned in the NICS internal accounting system at the Exxon Fuel Fabrication Facility on the basis of coded information included on the material transfer documents. This paper explains more fully the manner in which NICS assigns these factors

  5. Inferential backbone assignment for sparse data

    International Nuclear Information System (INIS)

    Vitek, Olga; Bailey-Kellogg, Chris; Craig, Bruce; Vitek, Jan

    2006-01-01

    This paper develops an approach to protein backbone NMR assignment that effectively assigns large proteins while using limited sets of triple-resonance experiments. Our approach handles proteins with large fractions of missing data and many ambiguous pairs of pseudoresidues, and provides a statistical assessment of confidence in global and position-specific assignments. The approach is tested on an extensive set of experimental and synthetic data of up to 723 residues, with match tolerances of up to 0.5 ppm for C α and C β resonance types. The tests show that the approach is particularly helpful when data contain experimental noise and require large match tolerances. The keys to the approach are an empirical Bayesian probability model that rigorously accounts for uncertainty in the data at all stages in the analysis, and a hybrid stochastic tree-based search algorithm that effectively explores the large space of possible assignments

  6. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  7. 32 CFR 884.2 - Assigned responsibilities.

    Science.gov (United States)

    2010-07-01

    ... OF PERSONNEL TO UNITED STATES CIVILIAN AUTHORITIES FOR TRIAL § 884.2 Assigned responsibilities. (a... 32 National Defense 6 2010-07-01 2010-07-01 false Assigned responsibilities. 884.2 Section 884.2... requests for return of members to the United States for delivery to civilian authorities when the request...

  8. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  9. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  10. Personnel dose assignment practices

    International Nuclear Information System (INIS)

    Fix, J.J.

    1993-04-01

    Implementation of DOE N 5480.6 Radiological Control Manual Article 511(3) requirements, to minimize the assignment of personnel dosimeters, should be done only under a broader context ensuring that capabilities are in place to monitor and record personnel exposure both for compliance and for potential litigation. As noted in NCRP Report No. 114, personnel dosimetry programs are conducted to meet four major objectives: radiation safety program control and evaluation; regulatory compliance; epidemiological research; and litigation. A change to Article 511(3) is proposed that would require that minimizing the assignment of personnel dosimeters take place only following full evaluation of overall capabilities (e.g., access control, area dosimetry, etc.) to meet the NCRP objectives

  11. Computational Aspects of Assigning Agents to a Line

    DEFF Research Database (Denmark)

    Aziz, Haris; Hougaard, Jens Leth; Moreno-Ternero, Juan D.

    2017-01-01

    -egalitarian assignments. The approach relies on an algorithm which is shown to be faster than general purpose algorithms for the assignment problem. We also extend the approach to probabilistic assignments and explore the computational features of existing, as well as new, methods for this setting....

  12. Computational aspects of assigning agents to a line

    DEFF Research Database (Denmark)

    Aziz, Haris; Hougaard, Jens Leth; Moreno-Ternero, Juan D.

    2017-01-01

    -egalitarian assignments. The approach relies on an algorithm which is shown to be faster than general purpose algorithms for the assignment problem. We also extend the approach to probabilistic assignments and explore the computational features of existing, as well as new, methods for this setting....

  13. A Computerized Approach to Trickle-Process, Random Assignment.

    Science.gov (United States)

    Braucht, G. Nicholas; Reichardt, Charles S.

    1993-01-01

    Procedures for implementing random assignment with trickle processing and ways they can be corrupted are described. A computerized method for implementing random assignment with trickle processing is presented as a desirable alternative in many situations and a way of protecting against threats to assignment validity. (SLD)

  14. Writing Assignments that Promote Active Learning

    Science.gov (United States)

    Narayanan, M.

    2014-12-01

    Encourage students to write a detailed, analytical report correlating classroom discussions to an important historical event or a current event. Motivate students interview an expert from industry on a topic that was discussed in class. Ask the students to submit a report with supporting sketches, drawings, circuit diagrams and graphs. Propose that the students generate a complete a set of reading responses pertaining to an assigned topic. Require each student to bring in one comment or one question about an assigned reading. The assignment should be a recent publication in an appropriate journal. Have the students conduct a web search on an assigned topic. Ask them to generate a set of ideas that can relate to classroom discussions. Provide the students with a study guide. The study guide should provide about 10 or 15 short topics. Quiz the students on one or two of the topics. Encourage the students to design or develop some creative real-world examples based on a chapter discussed or a topic of interest. Require that students originate, develop, support and defend a viewpoint using a specifically assigned material. Make the students practice using or utilizing a set of new technical terms they have encountered in an assigned chapter. Have students develop original examples explaining the different terms. Ask the students to select one important terminology from the previous classroom discussions. Encourage the students to explain why they selected that particular word. Ask them to talk about the importance of the terminology from the point of view of their educational objectives and future career. Angelo, T. A. (1991). Ten easy pieces: Assessing higher learning in four dimensions. In T. A. Angelo (Ed.), Classroom research: Early lessons from success (pp. 17-31). New Directions for Teaching and Learning, No. 46. San Francisco: Jossey-Bass.

  15. Microbial contamination level profiles attributed to contamination of beef carcasses, personnel, and equipment: case of small and medium enterprise slaughterhouses

    DEFF Research Database (Denmark)

    Wambui, Joseph; Lamuka, Peter; Karuri, Edward

    2018-01-01

    The microbial contamination level profiles (MCLPs) attributed to contamination of beef carcasses, personnel, and equipment in five Kenyan small and medium enterprise slaughterhouses were determined. Aerobic plate counts, Enterobacteriaceae, Staphylococcus, and Salmonella were used to determine...... contamination at four different slaughter stages, namely, dehiding, evisceration, splitting, and dispatch. Microbiological criteria of the four microorganisms were used to score contamination levels (CLs) as poor (0), poor to average (1), average (2), or good (3). MCLPs were further assigned to carcasses......, personnel, and equipment at each stage by summing up the CL scores. The CL score attributed to aerobic plate count contamination was 2 or 3 for carcasses but 0 for personnel and equipment in almost all slaughterhouses. A score of 0 on carcasses was mostly attributed to Enterobacteriaceae at evisceration...

  16. Detecting Plagiarism in MS Access Assignments

    Science.gov (United States)

    Singh, Anil

    2013-01-01

    Assurance of individual effort from students in computer-based assignments is a challenge. Due to digitization, students can easily use a copy of their friend's work and submit it as their own. Plagiarism in assignments puts students who cheat at par with those who work honestly and this compromises the learning evaluation process. Using a…

  17. Flexible taxonomic assignment of ambiguous sequencing reads

    Directory of Open Access Journals (Sweden)

    Jansson Jesper

    2011-01-01

    Full Text Available Abstract Background To characterize the diversity of bacterial populations in metagenomic studies, sequencing reads need to be accurately assigned to taxonomic units in a given reference taxonomy. Reads that cannot be reliably assigned to a unique leaf in the taxonomy (ambiguous reads are typically assigned to the lowest common ancestor of the set of species that match it. This introduces a potentially severe error in the estimation of bacteria present in the sample due to false positives, since all species in the subtree rooted at the ancestor are implicitly assigned to the read even though many of them may not match it. Results We present a method that maps each read to a node in the taxonomy that minimizes a penalty score while balancing the relevance of precision and recall in the assignment through a parameter q. This mapping can be obtained in time linear in the number of matching sequences, because LCA queries to the reference taxonomy take constant time. When applied to six different metagenomic datasets, our algorithm produces different taxonomic distributions depending on whether coverage or precision is maximized. Including information on the quality of the reads reduces the number of unassigned reads but increases the number of ambiguous reads, stressing the relevance of our method. Finally, two measures of performance are described and results with a set of artificially generated datasets are discussed. Conclusions The assignment strategy of sequencing reads introduced in this paper is a versatile and a quick method to study bacterial communities. The bacterial composition of the analyzed samples can vary significantly depending on how ambiguous reads are assigned depending on the value of the q parameter. Validation of our results in an artificial dataset confirm that a combination of values of q produces the most accurate results.

  18. First Trimester Fetal Gender Assignment by Ultrasound

    Directory of Open Access Journals (Sweden)

    Sabahattin Altunyurt

    2010-03-01

    Full Text Available Objective: To investigate the efficiency of genital tubercule angle on detecting fetal gender in first trimester by ultrasonography. Material-Method: Fetal sex assignment by ultrasound was carried out in 172 pregnancies at 11-13+6 weeks between 2007 June and 2007 December. Gestational age was determined by the measurement of crown-rump length (CRL. The ultrasound predictions were compared with actual sex at birth. Mid-sagittal planes of a section of the fetal genital tubercle were performed to identify the gender. Results: 155 of 172 patients’ data were achieved. The overall success rate was 92.3 % in sonographic assignment of fetal sex. The correct assignment rate in female fetuses was significantly higher than males (95.9 % - 88.8 % [p=0,001]. The correct identification of fetal sex improved with advancing gestational age from 89.3 % between 11-11+6 weeks, 92.5 % between 12-12+6 weeks and 93.4 % between 13-13+6 weeks (p=0,96. Conclusion: The fetal sex assignment by ultrasonography between 11-13+6 weeks had high success rate. The sensitivity of fetal sex assignment was not affected with fetus position and gestational age.

  19. Historical WBAN ID Assignments

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — 4"x6" index cards represent the first written assignments of Weather Bureau Army Navy (WBAN) station identifier numbers by the National Climatic Data Center....

  20. 78 FR 24765 - Notice of Intent To Close 16 Field Offices

    Science.gov (United States)

    2013-04-26

    ...; Dallas, TX; Lubbock, TX; Tucson, AZ; Fresno, CA; Sacramento, CA; San Diego, CA; and Spokane, WA. HUD is..., AZ; Fresno, CA; Sacramento, CA; San Diego, CA; and Spokane, WA. Employees who work in the... office--HUD will retain the field office in Phoenix, AZ. j. Sacramento, San Diego, and Fresno field...

  1. SCRAED - Simple and Complex Random Assignment in Experimental Designs

    OpenAIRE

    Alferes, Valentim R.

    2009-01-01

    SCRAED is a package of 37 self-contained SPSS syntax files that performs simple and complex random assignment in experimental designs. For between-subjects designs, SCRAED includes simple random assignment (no restrictions, forced equal sizes, forced unequal sizes, and unequal probabilities), block random assignment (simple and generalized blocks), and stratified random assignment (no restrictions, forced equal sizes, forced unequal sizes, and unequal probabilities). For within-subject...

  2. Life extension of low and medium voltage equipment

    International Nuclear Information System (INIS)

    Bharteey, B.M.; Hart, T.J.

    1990-01-01

    Nuclear plant life extension is becoming a very important issue with the passing of each day. Within 3 to 10 years after the turn of the century, licenses of a number of nuclear power plants in the United States will expire. For the near future, new construction of nuclear power plants in the United States is expected to be inhibited, if the current economic and regulatory environment continues to persist. This situation, coupled with aging of utility equipment and the high cost of financing new construction is resulting in a growing emphasis on preserving and extending the capability of existing power plants. Until now, the utilities have placed more emphasis on high cost items, but experience shows that extending life of low cost of device/components in items like Motor Control Center Centers and switchgear pays big dividends. According to the current practice, devices of these items are replaced at the end of their assigned qualified life or attended to when there is a problem resulting in an unplanned outage. In this paper based on extensive experience in the field of motor control centers and medium switchgear, the authors proposed a cookbook methodology to determine the extent or absence of degradation and establish trends of the pertinent operational properties of devices of this type of equipment. The test results also provide satisfactory evidence of class 1E nuclear safety-related function

  3. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  4. GENERAL ISSUES CONCERNING THE ASSIGNMENT OF SOCIAL PARTS

    Directory of Open Access Journals (Sweden)

    Stela Mihăilescu

    2012-11-01

    Full Text Available By means of the present study, we try to offer a thorough image and an analysis concerning the assignment mode of social parts within a company having limited liability. The assignment of social parts is free and unrestricted except for the cases provided by article 202, paragraph 2 from Law no. 31/ 1990- the law of commercial companies with further modifications and completions and the ones provided in OUG no. 54/ 2010 concerning some measures for fighting fiscal evasion. By means of the assignment operation a transmission is made up by an assignment of social parts contract towards one or more already associated persons in the company or towards other individual or legal persons who are going to obtain the associate quality. The principle governing any assignment is the one of goods circulation freedom, a freedom restricted only by the public order and imperative judicial norms.

  5. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  6. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  7. Stress Assignment in Reading Italian Polysyllabic Pseudowords

    Science.gov (United States)

    Sulpizio, Simone; Arduino, Lisa S.; Paizi, Despina; Burani, Cristina

    2013-01-01

    In 4 naming experiments we investigated how Italian readers assign stress to pseudowords. We assessed whether participants assign stress following distributional information such as stress neighborhood (the proportion and number of existent words sharing orthographic ending and stress pattern) and whether such distributional information affects…

  8. Assigning breed origin to alleles in crossbred animals.

    Science.gov (United States)

    Vandenplas, Jérémie; Calus, Mario P L; Sevillano, Claudia A; Windig, Jack J; Bastiaansen, John W M

    2016-08-22

    For some species, animal production systems are based on the use of crossbreeding to take advantage of the increased performance of crossbred compared to purebred animals. Effects of single nucleotide polymorphisms (SNPs) may differ between purebred and crossbred animals for several reasons: (1) differences in linkage disequilibrium between SNP alleles and a quantitative trait locus; (2) differences in genetic backgrounds (e.g., dominance and epistatic interactions); and (3) differences in environmental conditions, which result in genotype-by-environment interactions. Thus, SNP effects may be breed-specific, which has led to the development of genomic evaluations for crossbred performance that take such effects into account. However, to estimate breed-specific effects, it is necessary to know breed origin of alleles in crossbred animals. Therefore, our aim was to develop an approach for assigning breed origin to alleles of crossbred animals (termed BOA) without information on pedigree and to study its accuracy by considering various factors, including distance between breeds. The BOA approach consists of: (1) phasing genotypes of purebred and crossbred animals; (2) assigning breed origin to phased haplotypes; and (3) assigning breed origin to alleles of crossbred animals based on a library of assigned haplotypes, the breed composition of crossbred animals, and their SNP genotypes. The accuracy of allele assignments was determined for simulated datasets that include crosses between closely-related, distantly-related and unrelated breeds. Across these scenarios, the percentage of alleles of a crossbred animal that were correctly assigned to their breed origin was greater than 90 %, and increased with increasing distance between breeds, while the percentage of incorrectly assigned alleles was always less than 2 %. For the remaining alleles, i.e. 0 to 10 % of all alleles of a crossbred animal, breed origin could not be assigned. The BOA approach accurately assigns

  9. Integer Linear Programming for Constrained Multi-Aspect Committee Review Assignment

    Science.gov (United States)

    Karimzadehgan, Maryam; Zhai, ChengXiang

    2011-01-01

    Automatic review assignment can significantly improve the productivity of many people such as conference organizers, journal editors and grant administrators. A general setup of the review assignment problem involves assigning a set of reviewers on a committee to a set of documents to be reviewed under the constraint of review quota so that the reviewers assigned to a document can collectively cover multiple topic aspects of the document. No previous work has addressed such a setup of committee review assignments while also considering matching multiple aspects of topics and expertise. In this paper, we tackle the problem of committee review assignment with multi-aspect expertise matching by casting it as an integer linear programming problem. The proposed algorithm can naturally accommodate any probabilistic or deterministic method for modeling multiple aspects to automate committee review assignments. Evaluation using a multi-aspect review assignment test set constructed using ACM SIGIR publications shows that the proposed algorithm is effective and efficient for committee review assignments based on multi-aspect expertise matching. PMID:22711970

  10. Assignment and Correspondence Tracking System - Tactical / Operational Reporting

    Data.gov (United States)

    Social Security Administration — Reporting data store for the Assignment and Correspondence Tracking System (ACT). ACT automates the assignment and tracking of correspondence processing within the...

  11. Statistical aspects of optimal treatment assignment

    OpenAIRE

    van der Linden, Willem J.

    1980-01-01

    The issues of treatment assignment is ordinarily dealt with within the framework of testing aptitude treatment interaction (ATI) hypothesis. ATI research mostly uses linear regression techniques, and an ATI exists when the aptitude treatment (AT) regression lines cross each other within the relevant interval of the aptitude variable. Consistent with this approach is the use of the points of interaction of AT regression lines as treatment-assignment rule. The replacement of such rules by monot...

  12. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  13. One of My Favorite Assignments: Automated Teller Machine Simulation.

    Science.gov (United States)

    Oberman, Paul S.

    2001-01-01

    Describes an assignment for an introductory computer science class that requires the student to write a software program that simulates an automated teller machine. Highlights include an algorithm for the assignment; sample file contents; language features used; assignment variations; and discussion points. (LRW)

  14. 7 CFR 1900.5 - Assignment of cases.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Assignment of cases. 1900.5 Section 1900.5 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... REGULATIONS GENERAL Delegations of Authority § 1900.5 Assignment of cases. The State Director may, in writing...

  15. METHOD FOR SOLVING FUZZY ASSIGNMENT PROBLEM USING MAGNITUDE RANKING TECHNIQUE

    OpenAIRE

    D. Selvi; R. Queen Mary; G. Velammal

    2017-01-01

    Assignment problems have various applications in the real world because of their wide applicability in industry, commerce, management science, etc. Traditional classical assignment problems cannot be successfully used for real life problem, hence the use of fuzzy assignment problems is more appropriate. In this paper, the fuzzy assignment problem is formulated to crisp assignment problem using Magnitude Ranking technique and Hungarian method has been applied to find an optimal solution. The N...

  16. Increasing children's physical activity levels during recess periods in elementary schools: the effects of providing game equipment.

    Science.gov (United States)

    Verstraete, Stefanie J M; Cardon, Greet M; De Clercq, Dirk L R; De Bourdeaudhuij, Ilse M M

    2006-08-01

    During recess, children can be active on a daily basis, making it an important school environmental factor for the promotion of health-related physical activity. The aim of the present study was to investigate the effects of providing game equipment on children's physical activity levels during morning recess and lunch break in elementary schools. Seven elementary schools were randomly assigned to the intervention group (four schools), including 122 children (75 boys, 47 girls, mean age: 10.8 +/- 0.6 years), and to the control group (three schools), including 113 children (46 boys, 67 girls, mean age: 10.9 +/- 0.7 years). Children's activity levels were measured before and three months after providing game equipment, using MTI accelerometers. During lunch break, children's moderate and vigorous physical activity significantly increased in the intervention group (moderate: from 38 to 50%, vigorous: from 10 to 11%), while it decreased in the control group (moderate: from 44 to 39%, vigorous: from 11 to 5%). At morning recess, providing game equipment was effective in increasing children's moderate physical activity (from 41 to 45%), while it decreased in the control group (from 41 to 34%). Providing game equipment during recess periods was found to be effective in increasing children's physical activity levels. This finding suggests that promoting physical activity through game equipment provision during recess periods can contribute to reach the daily activity levels recommended for good health.

  17. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  18. A probabilistic approach for validating protein NMR chemical shift assignments

    International Nuclear Information System (INIS)

    Wang Bowei; Wang, Yunjun; Wishart, David S.

    2010-01-01

    It has been estimated that more than 20% of the proteins in the BMRB are improperly referenced and that about 1% of all chemical shift assignments are mis-assigned. These statistics also reflect the likelihood that any newly assigned protein will have shift assignment or shift referencing errors. The relatively high frequency of these errors continues to be a concern for the biomolecular NMR community. While several programs do exist to detect and/or correct chemical shift mis-referencing or chemical shift mis-assignments, most can only do one, or the other. The one program (SHIFTCOR) that is capable of handling both chemical shift mis-referencing and mis-assignments, requires the 3D structure coordinates of the target protein. Given that chemical shift mis-assignments and chemical shift re-referencing issues should ideally be addressed prior to 3D structure determination, there is a clear need to develop a structure-independent approach. Here, we present a new structure-independent protocol, which is based on using residue-specific and secondary structure-specific chemical shift distributions calculated over small (3-6 residue) fragments to identify mis-assigned resonances. The method is also able to identify and re-reference mis-referenced chemical shift assignments. Comparisons against existing re-referencing or mis-assignment detection programs show that the method is as good or superior to existing approaches. The protocol described here has been implemented into a freely available Java program called 'Probabilistic Approach for protein Nmr Assignment Validation (PANAV)' and as a web server (http://redpoll.pharmacy.ualberta.ca/PANAVhttp://redpoll.pharmacy.ualberta.ca/PANAV) which can be used to validate and/or correct as well as re-reference assigned protein chemical shifts.

  19. Testing the Effectiveness of Online Assignments in Theory of Finance

    Science.gov (United States)

    Batu, Michael; Bower, Nancy; Lun, Esmond; Sadanand, Asha

    2018-01-01

    The authors investigated the effectiveness of online versus paper assignments using final examination scores in three cohorts of theory of finance. In particular, two cohorts were exposed to online assignments while another cohort was exposed to traditional assignments. The central result is that exposure to online assignments robustly leads to…

  20. Evaluation of protection factor of respiratory protective equipment using indigenously developed protection factor test facility

    International Nuclear Information System (INIS)

    Patkulkar, D.S.; Ganesh, G.; Tripathi, R.M.

    2018-01-01

    Assigned protection factor (APF) is an indicator representing effectiveness of a respirator and it provides workplace level of respiratory protection for workers in providing protection against exposure to airborne contaminants Occupational Safety and Health Administration (OSHA) specifies 'Respirator APF' and 'Maximum Use Concentration' (MUC - a term derived using APF) shall be an integral part of Respirator Protection Standard. MUC establishes the maximum airborne concentration of a contaminant in which a respirator with a given APF may be used. The use of particulate respirators such as half face mask, full face mask and powered air purifying respirators is essential for radioactive jobs in nuclear facilities to prevent any intake of radionuclide. With this impetus, the Protection Factor Test Facility (PFTF) for testing and evaluation of respiratory protective equipment meeting relevant applicable standards was designed, fabricated and installed in Respiratory Protective Equipment Laboratory of Health Physics Division

  1. 12 CFR 563e.28 - Assigned ratings.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Assigned ratings. 563e.28 Section 563e.28 Banks... for Assessing Performance § 563e.28 Assigned ratings. (a) Ratings in general. Subject to paragraphs (b... performance under the lending, investment and service tests, the community development test, the small savings...

  2. Privacy-Preserving Task Assignment in Spatial Crowdsourcing

    KAUST Repository

    Liu, An

    2017-09-20

    With the progress of mobile devices and wireless networks, spatial crowdsourcing (SC) is emerging as a promising approach for problem solving. In SC, spatial tasks are assigned to and performed by a set of human workers. To enable effective task assignment, however, both workers and task requesters are required to disclose their locations to untrusted SC systems. In this paper, we study the problem of assigning workers to tasks in a way that location privacy for both workers and task requesters is preserved. We first combine the Paillier cryptosystem with Yao’s garbled circuits to construct a secure protocol that assigns the nearest worker to a task. Considering that this protocol cannot scale to a large number of workers, we then make use of Geohash, a hierarchical spatial index to design a more efficient protocol that can securely find approximate nearest workers. We theoretically show that these two protocols are secure against semi-honest adversaries. Through extensive experiments on two real-world datasets, we demonstrate the efficiency and effectiveness of our protocols.

  3. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  4. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  5. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  6. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  7. Incorporating breeding abundance into spatial assignments on continuous surfaces.

    Science.gov (United States)

    Rushing, Clark S; Marra, Peter P; Studds, Colin E

    2017-06-01

    Determining the geographic connections between breeding and nonbreeding populations, termed migratory connectivity, is critical to advancing our understanding of the ecology and conservation of migratory species. Assignment models based on stable isotopes historically have been an important tool for studying migratory connectivity of small-bodied species, but the low resolution of these assignments has generated interest into combining isotopes with other sources in information. Abundance is one of the most appealing data sources to include in isotope-based assignments, but there are currently no statistical methods or guidelines for optimizing the contribution of stable isotopes and abundance for inferring migratory connectivity. Using known-origin stable-hydrogen isotope samples of six Neotropical migratory bird species, we rigorously assessed the performance of assignment models that differentially weight the contribution of the isotope and abundance data. For two species with adequate sample sizes, we used Pareto optimality to determine the set of models that simultaneously minimized both assignment error rate and assignment area. We then assessed the ability of the top models from these two species to improve assignments of the remaining four species compared to assignments based on isotopes alone. We show that the increased precision of models that include abundance is often offset by a large increase in assignment error. However, models that optimally weigh the abundance data relative to the isotope data can result in higher precision and, in some cases, lower error than models based on isotopes alone. The top models, however, depended on the distribution of relative breeding abundance, with patchier distributions requiring stronger downweighting of abundance, and we present general guidelines for future studies. These results confirm that breeding abundance can be an important source of information for studies investigating broad-scale movements of

  8. Dual earners’ willingness to accept an international assignment.

    NARCIS (Netherlands)

    van der Velde, E.G.; Bossink, C.J.H.; Jansen, P.G.W.

    2005-01-01

    Multinational organisations experience difficulties in finding managers willing to accept international assignments. This study has therefore focused on factors that can predict males' and females' willingness to accept international assignments, or to follow their partners on international

  9. Task assignment and coaching

    NARCIS (Netherlands)

    Dominguez-Martinez, S.

    2009-01-01

    An important task of a manager is to motivate her subordinates. One way in which a manager can give incentives to junior employees is through the assignment of tasks. How a manager allocates tasks in an organization, provides information to the junior employees about his ability. Without coaching

  10. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  11. Calibrated peer review assignments for the earth sciences

    Science.gov (United States)

    Rudd, J.A.; Wang, V.Z.; Cervato, C.; Ridky, R.W.

    2009-01-01

    Calibrated Peer Review ??? (CPR), a web-based instructional tool developed as part of the National Science Foundation reform initiatives in undergraduate science education, allows instructors to incorporate multiple writing assignments in large courses without overwhelming the instructor. This study reports successful implementation of CPR in a large, introductory geology course and student learning of geoscience content. For each CPR assignment in this study, students studied web-based and paper resources, wrote an essay, and reviewed seven essays (three from the instructor, three from peers, and their own) on the topic. Although many students expressed negative attitudes and concerns, particularly about the peer review process of this innovative instructional approach, they also recognized the learning potential of completing CPR assignments. Comparing instruction on earthquakes and plate boundaries using a CPR assignment vs. an instructional video lecture and homework essay with extensive instructor feedback, students mastered more content via CPR instruction.

  12. Subcarrier Group Assignment for MC-CDMA Wireless Networks

    Directory of Open Access Journals (Sweden)

    Le-Ngoc Tho

    2007-01-01

    Full Text Available Two interference-based subcarrier group assignment strategies in dynamic resource allocation are proposed for MC-CDMA wireless systems to achieve high throughput in a multicell environment. Least interfered group assignment (LIGA selects for each session the subcarrier group on which the user receives the minimum interference, while best channel ratio group assignment (BCRGA chooses the subcarrier group with the largest channel response-to-interference ratio. Both analytical framework and simulation model are developed for evaluation of throughput distribution of the proposed schemes. An iterative approach is devised to handle the complex interdependency between multicell interference profiles in the throughput analysis. Illustrative results show significant throughput improvement offered by the interference-based assignment schemes for MC-CDMA multicell wireless systems. In particular, under low loading conditions, LIGA renders the best performance. However, as the load increases BCRGA tends to offer superior performance.

  13. Subcarrier Group Assignment for MC-CDMA Wireless Networks

    Directory of Open Access Journals (Sweden)

    Tho Le-Ngoc

    2007-12-01

    Full Text Available Two interference-based subcarrier group assignment strategies in dynamic resource allocation are proposed for MC-CDMA wireless systems to achieve high throughput in a multicell environment. Least interfered group assignment (LIGA selects for each session the subcarrier group on which the user receives the minimum interference, while best channel ratio group assignment (BCRGA chooses the subcarrier group with the largest channel response-to-interference ratio. Both analytical framework and simulation model are developed for evaluation of throughput distribution of the proposed schemes. An iterative approach is devised to handle the complex interdependency between multicell interference profiles in the throughput analysis. Illustrative results show significant throughput improvement offered by the interference-based assignment schemes for MC-CDMA multicell wireless systems. In particular, under low loading conditions, LIGA renders the best performance. However, as the load increases BCRGA tends to offer superior performance.

  14. RNA-PAIRS: RNA probabilistic assignment of imino resonance shifts

    International Nuclear Information System (INIS)

    Bahrami, Arash; Clos, Lawrence J.; Markley, John L.; Butcher, Samuel E.; Eghbalnia, Hamid R.

    2012-01-01

    The significant biological role of RNA has further highlighted the need for improving the accuracy, efficiency and the reach of methods for investigating RNA structure and function. Nuclear magnetic resonance (NMR) spectroscopy is vital to furthering the goals of RNA structural biology because of its distinctive capabilities. However, the dispersion pattern in the NMR spectra of RNA makes automated resonance assignment, a key step in NMR investigation of biomolecules, remarkably challenging. Herein we present RNA Probabilistic Assignment of Imino Resonance Shifts (RNA-PAIRS), a method for the automated assignment of RNA imino resonances with synchronized verification and correction of predicted secondary structure. RNA-PAIRS represents an advance in modeling the assignment paradigm because it seeds the probabilistic network for assignment with experimental NMR data, and predicted RNA secondary structure, simultaneously and from the start. Subsequently, RNA-PAIRS sets in motion a dynamic network that reverberates between predictions and experimental evidence in order to reconcile and rectify resonance assignments and secondary structure information. The procedure is halted when assignments and base-parings are deemed to be most consistent with observed crosspeaks. The current implementation of RNA-PAIRS uses an initial peak list derived from proton-nitrogen heteronuclear multiple quantum correlation ( 1 H– 15 N 2D HMQC) and proton–proton nuclear Overhauser enhancement spectroscopy ( 1 H– 1 H 2D NOESY) experiments. We have evaluated the performance of RNA-PAIRS by using it to analyze NMR datasets from 26 previously studied RNAs, including a 111-nucleotide complex. For moderately sized RNA molecules, and over a range of comparatively complex structural motifs, the average assignment accuracy exceeds 90%, while the average base pair prediction accuracy exceeded 93%. RNA-PAIRS yielded accurate assignments and base pairings consistent with imino resonances for a

  15. RNA-PAIRS: RNA probabilistic assignment of imino resonance shifts

    Energy Technology Data Exchange (ETDEWEB)

    Bahrami, Arash; Clos, Lawrence J.; Markley, John L.; Butcher, Samuel E. [National Magnetic Resonance Facility at Madison (United States); Eghbalnia, Hamid R., E-mail: eghbalhd@uc.edu [University of Cincinnati, Department of Molecular and Cellular Physiology (United States)

    2012-04-15

    The significant biological role of RNA has further highlighted the need for improving the accuracy, efficiency and the reach of methods for investigating RNA structure and function. Nuclear magnetic resonance (NMR) spectroscopy is vital to furthering the goals of RNA structural biology because of its distinctive capabilities. However, the dispersion pattern in the NMR spectra of RNA makes automated resonance assignment, a key step in NMR investigation of biomolecules, remarkably challenging. Herein we present RNA Probabilistic Assignment of Imino Resonance Shifts (RNA-PAIRS), a method for the automated assignment of RNA imino resonances with synchronized verification and correction of predicted secondary structure. RNA-PAIRS represents an advance in modeling the assignment paradigm because it seeds the probabilistic network for assignment with experimental NMR data, and predicted RNA secondary structure, simultaneously and from the start. Subsequently, RNA-PAIRS sets in motion a dynamic network that reverberates between predictions and experimental evidence in order to reconcile and rectify resonance assignments and secondary structure information. The procedure is halted when assignments and base-parings are deemed to be most consistent with observed crosspeaks. The current implementation of RNA-PAIRS uses an initial peak list derived from proton-nitrogen heteronuclear multiple quantum correlation ({sup 1}H-{sup 15}N 2D HMQC) and proton-proton nuclear Overhauser enhancement spectroscopy ({sup 1}H-{sup 1}H 2D NOESY) experiments. We have evaluated the performance of RNA-PAIRS by using it to analyze NMR datasets from 26 previously studied RNAs, including a 111-nucleotide complex. For moderately sized RNA molecules, and over a range of comparatively complex structural motifs, the average assignment accuracy exceeds 90%, while the average base pair prediction accuracy exceeded 93%. RNA-PAIRS yielded accurate assignments and base pairings consistent with imino

  16. Interactive visual exploration and refinement of cluster assignments.

    Science.gov (United States)

    Kern, Michael; Lex, Alexander; Gehlenborg, Nils; Johnson, Chris R

    2017-09-12

    With ever-increasing amounts of data produced in biology research, scientists are in need of efficient data analysis methods. Cluster analysis, combined with visualization of the results, is one such method that can be used to make sense of large data volumes. At the same time, cluster analysis is known to be imperfect and depends on the choice of algorithms, parameters, and distance measures. Most clustering algorithms don't properly account for ambiguity in the source data, as records are often assigned to discrete clusters, even if an assignment is unclear. While there are metrics and visualization techniques that allow analysts to compare clusterings or to judge cluster quality, there is no comprehensive method that allows analysts to evaluate, compare, and refine cluster assignments based on the source data, derived scores, and contextual data. In this paper, we introduce a method that explicitly visualizes the quality of cluster assignments, allows comparisons of clustering results and enables analysts to manually curate and refine cluster assignments. Our methods are applicable to matrix data clustered with partitional, hierarchical, and fuzzy clustering algorithms. Furthermore, we enable analysts to explore clustering results in context of other data, for example, to observe whether a clustering of genomic data results in a meaningful differentiation in phenotypes. Our methods are integrated into Caleydo StratomeX, a popular, web-based, disease subtype analysis tool. We show in a usage scenario that our approach can reveal ambiguities in cluster assignments and produce improved clusterings that better differentiate genotypes and phenotypes.

  17. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  18. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  19. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  20. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  1. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  2. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  3. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  4. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  5. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  6. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  7. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  8. Student generated assignments about electrical circuits in a computer simulation

    NARCIS (Netherlands)

    Vreman-de Olde, Cornelise; de Jong, Anthonius J.M.

    2004-01-01

    In this study we investigated the design of assignments by students as a knowledge-generating activity. Students were required to design assignments for 'other students' in a computer simulation environment about electrical circuits. Assignments consisted of a question, alternatives, and feedback on

  9. On pole structure assignment in linear systems

    Czech Academy of Sciences Publication Activity Database

    Loiseau, J.-J.; Zagalak, Petr

    2009-01-01

    Roč. 82, č. 7 (2009), s. 1179-1192 ISSN 0020-7179 R&D Projects: GA ČR(CZ) GA102/07/1596 Institutional research plan: CEZ:AV0Z10750506 Keywords : linear systems * linear state feedback * pole structure assignment Subject RIV: BC - Control Systems Theory Impact factor: 1.124, year: 2009 http://library.utia.cas.cz/separaty/2009/AS/zagalak-on pole structure assignment in linear systems.pdf

  10. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  11. Personnel shift assignment: Existence conditions and network models

    NARCIS (Netherlands)

    van den Berg, Jeroen P.; van den Berg, J.P.; Panton, David M.

    1994-01-01

    The personnel scheduling problem is known to be a five-stage process in which the final stage involves the assignment of shifts to the days worked in the schedule. This paper discusses the existence conditions for both continuous and forward rotating shift assignments and heuristic network

  12. 75 FR 55355 - Delegation of Authority and Assignment of Responsibility

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF LABOR Office of the Secretary Delegation of Authority and Assignment of Responsibility Secretary's Order 4-2010 Subject: Delegation of Authority and Assignment of Responsibility to the... delegations and assignments in full force and effect, except as expressly modified herein. 4. Delegation of...

  13. Staff assignment practices in nursing homes: review of the literature.

    Science.gov (United States)

    Rahman, Anna; Straker, Jane K; Manning, Lydia

    2009-01-01

    Consistent assignment, whereby nursing home staff members, particularly certified nurse aides, are assigned to the same residents on most shifts, is increasingly viewed as a cornerstone of culture change in nursing homes. It has been advocated as a best-care model that increases residents' quality of life while contributing to a more stable frontline staff. Given these potential benefits, consistent assignment is now widely viewed as superior to rotating assignment, an alternative staffing model that aims to distribute care burden more fairly among staff and ensure that workers are familiar with most residents. Despite favorable anecdotal reports about the benefits of consistent assignment, the research literature reports mixed and sometimes contradictory findings for this staffing practice. This article reviews the research pertaining to staff assignment practices in nursing homes. Reviewed here are 13 reports on experimental trials (6 reports), evaluation research (4 reports), and nursing home surveys (3 reports). The review reveals broad diversity in staffing practices and raises questions that challenge popular assumptions about consistent assignment. The article closes with a discussion of the research, policy, and practice implications of the research findings.

  14. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  15. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  16. 75 FR 55354 - Delegation of Authority and Assignment of Responsibilities

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF LABOR Office of the Secretary Delegation of Authority and Assignment of Responsibilities Secretary's Order 3-2010 Subject: Delegation of Authority and Assignment of Responsibilities to... Secretary to enforce sections 18A and 18B of the FLSA. 4. Delegation of Authority and Assignment of...

  17. Quality Control Test for Sequence-Phenotype Assignments

    Science.gov (United States)

    Ortiz, Maria Teresa Lara; Rosario, Pablo Benjamín Leon; Luna-Nevarez, Pablo; Gamez, Alba Savin; Martínez-del Campo, Ana; Del Rio, Gabriel

    2015-01-01

    Relating a gene mutation to a phenotype is a common task in different disciplines such as protein biochemistry. In this endeavour, it is common to find false relationships arising from mutations introduced by cells that may be depurated using a phenotypic assay; yet, such phenotypic assays may introduce additional false relationships arising from experimental errors. Here we introduce the use of high-throughput DNA sequencers and statistical analysis aimed to identify incorrect DNA sequence-phenotype assignments and observed that 10–20% of these false assignments are expected in large screenings aimed to identify critical residues for protein function. We further show that this level of incorrect DNA sequence-phenotype assignments may significantly alter our understanding about the structure-function relationship of proteins. We have made available an implementation of our method at http://bis.ifc.unam.mx/en/software/chispas. PMID:25700273

  18. 25 CFR 225.33 - Assignment of minerals agreements.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Assignment of minerals agreements. 225.33 Section 225.33 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS OIL AND GAS, GEOTHERMAL, AND SOLID MINERALS AGREEMENTS Minerals Agreements § 225.33 Assignment of minerals agreements. An...

  19. Automating Formative and Summative Feedback for Individualised Assignments

    Science.gov (United States)

    Hamilton, Ian Robert

    2009-01-01

    Purpose: The purpose of this paper is to report on the rationale behind the use of a unique paper-based individualised accounting assignment, which automated the provision to students of immediate formative and timely summative feedback. Design/methodology/approach: As students worked towards completing their assignment, the package provided…

  20. submission of art studio-based assignments: students experience

    African Journals Online (AJOL)

    PUBLICATIONS1

    are reluctant to complete their studio assignments on time are critically ... tative and qualitative data, derived from survey and interviews were used to ... is therefore exploratory and studio based. It ... mogenous group of students who report pro- ... Assignment management .... The analyses in this study are based on data.

  1. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  2. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  3. Heuristic for Task-Worker Assignment with Varying Learning Slopes

    Directory of Open Access Journals (Sweden)

    Wipawee Tharmmaphornphilas

    2010-04-01

    Full Text Available Fashion industry has variety products, so the multi-skilled workers are required to improve flexibility in production and assignment. Generally the supervisor will assign task to the workers based on skill and skill levels of worker. Since in fashion industry new product styles are launched more frequently and the order size tends to be smaller, the workers always learn when the raw material and the production process changes. Consequently they require less time to produce the succeeding units of a task based on their learning ability. Since the workers have both experience and inexperience workers, so each worker has different skill level and learning ability. Consequently, the assignment which assumed constant skill level is not proper to use. This paper proposes a task-worker assignment considering worker skill levels and learning abilities. Processing time of each worker changes along production period due to a worker learning ability. We focus on a task-worker assignment in a fashion industry where tasks are ordered in series; the number of tasks is greater than the number of workers. Therefore, workers can perform multiple assignments followed the precedence restriction as an assembly line balancing problem. The problem is formulated in an integer linear programming model with objective to minimize makespan. A heuristic is proposed to determine the lower bound (LB and the upper bound (UB of the problem and the best assignment is determined. The performance of the heuristic method is tested by comparing quality of solution and computational time to optimal solutions.

  4. Assignment Procedures in the Air Force Procurement Management Information System.

    Science.gov (United States)

    Ward, Joe H., Jr.; And Others

    An overview is presented of the procedure for offering jobs in the Air Force Procurement Management Information System (PROMIS), an assignment system which makes possible the use of human resources research findings to improve individual personnel assignments. A general framework for viewing personnel assignment systems is presented; then job…

  5. A property of assignment type mixed integer linear programming problems

    NARCIS (Netherlands)

    Benders, J.F.; van Nunen, J.A.E.E.

    1982-01-01

    In this paper we will proof that rather tight upper bounds can be given for the number of non-unique assignments that are achieved after solving the linear programming relaxation of some types of mixed integer linear assignment problems. Since in these cases the number of splitted assignments is

  6. 41 CFR 105-8.152 - Program accessibility: Assignment of space.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Program accessibility: Assignment of space. 105-8.152 Section 105-8.152 Public Contracts and Property Management Federal Property...-8.152 Program accessibility: Assignment of space. (a) When GSA assigns or reassigns space to an...

  7. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  8. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  9. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  10. Scaffolding Assignments and Activities for Undergraduate Research Methods

    Science.gov (United States)

    Fisher, Sarah; Justwan, Florian

    2018-01-01

    This article details assignments and lessons created for and tested in research methods courses at two different universities, a large state school and a small liberal arts college. Each assignment or activity utilized scaffolding. Students were asked to push beyond their comfort zone while utilizing concrete and/or creative examples,…

  11. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  12. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  13. Socially-assigned race, healthcare discrimination and preventive healthcare services.

    Directory of Open Access Journals (Sweden)

    Tracy Macintosh

    Full Text Available Race and ethnicity, typically defined as how individuals self-identify, are complex social constructs. Self-identified racial/ethnic minorities are less likely to receive preventive care and more likely to report healthcare discrimination than self-identified non-Hispanic whites. However, beyond self-identification, these outcomes may vary depending on whether racial/ethnic minorities are perceived by others as being minority or white; this perception is referred to as socially-assigned race.To examine the associations between socially-assigned race and healthcare discrimination and receipt of selected preventive services.Cross-sectional analysis of the 2004 Behavioral Risk Factor Surveillance System "Reactions to Race" module. Respondents from seven states and the District of Columbia were categorized into 3 groups, defined by a composite of self-identified race/socially-assigned race: Minority/Minority (M/M, n = 6,837, Minority/White (M/W, n = 929, and White/White (W/W, n = 25,913. Respondents were 18 years or older, with 61.7% under age 60; 51.8% of respondents were female. Measures included reported healthcare discrimination and receipt of vaccinations and cancer screenings.Racial/ethnic minorities who reported being socially-assigned as minority (M/M were more likely to report healthcare discrimination compared with those who reported being socially-assigned as white (M/W (8.9% vs. 5.0%, p = 0.002. Those reporting being socially-assigned as white (M/W and W/W had similar rates for past-year influenza (73.1% vs. 74.3% and pneumococcal (69.3% vs. 58.6% vaccinations; however, rates were significantly lower among M/M respondents (56.2% and 47.6%, respectively, p-values<0.05. There were no significant differences between the M/M and M/W groups in the receipt of cancer screenings.Racial/ethnic minorities who reported being socially-assigned as white are more likely to receive preventive vaccinations and less likely to report

  14. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  15. The Presentation Assignment: Creating Learning Opportunities for Diverse Student Populations.

    Science.gov (United States)

    Spencer, Brenda H.; Bartle-Angus, Kathryn

    2000-01-01

    Finds the presentation assignment to be an effective method of providing students with the opportunity to apply the literacy skills they are learning in ways that are personally meaningful. Describes the presentation assignment framework and provides an example of an assignment that required students to analyze and interpret works of literature…

  16. Triage level assignment and nurse characteristics and experience.

    Science.gov (United States)

    Gómez-Angelats, Elisenda; Miró, Òscar; Bragulat Baur, Ernesto; Antolín Santaliestra, Alberto; Sánchez Sánchez, Miquel

    2018-06-01

    To study the relation between nursing staff demographics and experience and their assignment of triage level in the emergency department. One-year retrospective observational study in the triage area of a tertiary care urban university hospital that applies the Andorran-Spanish triage model. Variables studied were age, gender, nursing experience, triage experience, shift, usual level of emergency work the nurse undertakes, number of triage decisions made, and percentage of patients assigned to each level. Fifty nurses (5 men, 45 women) with a mean (SD) age of 45 (9) years triaged 67 803 patients during the year. Nurses classified more patients in level 5 on the morning shift (7.9%) than on the afternoon shift (5.5%) (P=.003). The difference in the rate of level-5 triage classification became significant when nurses were older (β = 0.092, P=.037) and experience was greater (β = 0.103, P=.017). The number of triages recorded by a nurse was significantly and directly related to the percentage of patients assigned to level 3 (β = 0.003, P=.006) and inversely related to the percentages assigned to level 4 (β = -0.002, P=.008) and level 5 (β = -0.001, P=.017). We found that triage level assignments were related to age, experience, shift, and total number of patients triaged by a nurse.

  17. Visual words assignment via information-theoretic manifold embedding.

    Science.gov (United States)

    Deng, Yue; Li, Yipeng; Qian, Yanjun; Ji, Xiangyang; Dai, Qionghai

    2014-10-01

    Codebook-based learning provides a flexible way to extract the contents of an image in a data-driven manner for visual recognition. One central task in such frameworks is codeword assignment, which allocates local image descriptors to the most similar codewords in the dictionary to generate histogram for categorization. Nevertheless, existing assignment approaches, e.g., nearest neighbors strategy (hard assignment) and Gaussian similarity (soft assignment), suffer from two problems: 1) too strong Euclidean assumption and 2) neglecting the label information of the local descriptors. To address the aforementioned two challenges, we propose a graph assignment method with maximal mutual information (GAMI) regularization. GAMI takes the power of manifold structure to better reveal the relationship of massive number of local features by nonlinear graph metric. Meanwhile, the mutual information of descriptor-label pairs is ultimately optimized in the embedding space for the sake of enhancing the discriminant property of the selected codewords. According to such objective, two optimization models, i.e., inexact-GAMI and exact-GAMI, are respectively proposed in this paper. The inexact model can be efficiently solved with a closed-from solution. The stricter exact-GAMI nonparametrically estimates the entropy of descriptor-label pairs in the embedding space and thus leads to a relatively complicated but still trackable optimization. The effectiveness of GAMI models are verified on both the public and our own datasets.

  18. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  19. The development of the American National Standard 'control of radioactive surface contamination on materials equipment and facilities to be released for uncontrolled use'

    International Nuclear Information System (INIS)

    Shapiro, J.

    1980-01-01

    A new standard submitted by the Health Physics Society Standards Committee to the American National Standards Institute concerning radioactive surface contamination of materials and equipment is discussed. The chronological events in the development of this standard are given. The standard provides criteria for the release for uncontrolled use of materials, equipment and facilities contaminated or potentially contaminated with radioactivity. Permissible contamination limits are specified for: 1) long lived alpha emitters except natural uranium and thorium, 2) more hazardous beta-gamma emitters, 3) less hazardous beta-gamma emitters and 4) natural uranium and thorium. A contamination reference level of 1000 dpm/100 cm 2 for 90 Sr was set as the basis for assigning limits to radionuclides presenting an ingestion hazard and other radionuclides were grouped based on the values of their maximum permissible concentration (MPC) in water relative to 90 Sr. The contamination limit for 239 Pu was chosen as the basis for assigning limits based on MPC in air to radionuclides presenting an inhalation hazard; a value of 100 dpm/100 cm 2 was adopted in the standard. An upper limit of 5000 dpm/100 cm 2 for surface contamination was selected for the standard. (UK)

  20. Contact replacement for NMR resonance assignment.

    Science.gov (United States)

    Xiong, Fei; Pandurangan, Gopal; Bailey-Kellogg, Chris

    2008-07-01

    Complementing its traditional role in structural studies of proteins, nuclear magnetic resonance (NMR) spectroscopy is playing an increasingly important role in functional studies. NMR dynamics experiments characterize motions involved in target recognition, ligand binding, etc., while NMR chemical shift perturbation experiments identify and localize protein-protein and protein-ligand interactions. The key bottleneck in these studies is to determine the backbone resonance assignment, which allows spectral peaks to be mapped to specific atoms. This article develops a novel approach to address that bottleneck, exploiting an available X-ray structure or homology model to assign the entire backbone from a set of relatively fast and cheap NMR experiments. We formulate contact replacement for resonance assignment as the problem of computing correspondences between a contact graph representing the structure and an NMR graph representing the data; the NMR graph is a significantly corrupted, ambiguous version of the contact graph. We first show that by combining connectivity and amino acid type information, and exploiting the random structure of the noise, one can provably determine unique correspondences in polynomial time with high probability, even in the presence of significant noise (a constant number of noisy edges per vertex). We then detail an efficient randomized algorithm and show that, over a variety of experimental and synthetic datasets, it is robust to typical levels of structural variation (1-2 AA), noise (250-600%) and missings (10-40%). Our algorithm achieves very good overall assignment accuracy, above 80% in alpha-helices, 70% in beta-sheets and 60% in loop regions. Our contact replacement algorithm is implemented in platform-independent Python code. The software can be freely obtained for academic use by request from the authors.

  1. Research on development of multi-channel analyzer used for monitoring and warning radiation equipment

    International Nuclear Information System (INIS)

    Nguyen Van Sy; Dang Quang Thieu; Nguyen Thi Bao My

    2015-01-01

    The subject assigned to this paper presents research on development of multi-channel analyzer used for monitoring and warning environmental radiation equipment under the project KC.05.16/11-15 Research on manufacturing equipment monitoring and warning radiation. In this thematic we have two subjects that need to be resolved such as: i) Designing spectroscopy amplifier block (AMP) duty pulse signals obtained about few hundred millivolts output from scintillation detector preamplifier, amplified as a few volts and the standard Gaussian pulses shaped to connect to the analog-to-digital converter. The spectroscopy amplifier block can change the gain by digital control to respond to the problem of automatic spectrum stability for multi-channel analyzer systems. ii) Designing analog-to-digital converter block (ADC) in accordance with the actual conditions, such as high stability, fast conversion time, high throughput, and it consumes low energy. Selecting suitable microprocessor for fast connection ability, to operate reliably paired with the analog-to-digital converter into a multi-channel analyzer (MCA) serving analysis. (author)

  2. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  3. 28 CFR 545.23 - Inmate work/program assignment.

    Science.gov (United States)

    2010-07-01

    ... community living area, unless the pretrial inmate has signed a waiver of his or her right not to work (see... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Inmate work/program assignment. 545.23... WORK AND COMPENSATION Inmate Work and Performance Pay Program § 545.23 Inmate work/program assignment...

  4. Optimal assignment of incoming flights to baggage carousels at airports

    DEFF Research Database (Denmark)

    Barth, Torben C.

    The problem considered in this report is an assignment problem occurring at airports. This problem concerns the assignment of baggage carousels in baggage claim halls to arriving aircraft (baggage carousel assignment problem). This is a highly dynamic problem since disruptions frequently occur du...... and in general is a substantial support in decision making....

  5. PARETO OPTIMAL SOLUTIONS FOR MULTI-OBJECTIVE GENERALIZED ASSIGNMENT PROBLEM

    Directory of Open Access Journals (Sweden)

    S. Prakash

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: The Multi-Objective Generalized Assignment Problem (MGAP with two objectives, where one objective is linear and the other one is non-linear, has been considered, with the constraints that a job is assigned to only one worker – though he may be assigned more than one job, depending upon the time available to him. An algorithm is proposed to find the set of Pareto optimal solutions of the problem, determining assignments of jobs to workers with two objectives without setting priorities for them. The two objectives are to minimise the total cost of the assignment and to reduce the time taken to complete all the jobs.

    AFRIKAANSE OPSOMMING: ‘n Multi-doelwit veralgemeende toekenningsprobleem (“multi-objective generalised assignment problem – MGAP” met twee doelwitte, waar die een lineêr en die ander nielineêr is nie, word bestudeer, met die randvoorwaarde dat ‘n taak slegs toegedeel word aan een werker – alhoewel meer as een taak aan hom toegedeel kan word sou die tyd beskikbaar wees. ‘n Algoritme word voorgestel om die stel Pareto-optimale oplossings te vind wat die taaktoedelings aan werkers onderhewig aan die twee doelwitte doen sonder dat prioriteite toegeken word. Die twee doelwitte is om die totale koste van die opdrag te minimiseer en om die tyd te verminder om al die take te voltooi.

  6. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  7. Game theory and traffic assignment.

    Science.gov (United States)

    2013-09-01

    Traffic assignment is used to determine the number of users on roadway links in a network. While this problem has : been widely studied in transportation literature, its use of the concept of equilibrium has attracted considerable interest : in the f...

  8. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  9. Simulated annealing algorithm for solving chambering student-case assignment problem

    Science.gov (United States)

    Ghazali, Saadiah; Abdul-Rahman, Syariza

    2015-12-01

    The problem related to project assignment problem is one of popular practical problem that appear nowadays. The challenge of solving the problem raise whenever the complexity related to preferences, the existence of real-world constraints and problem size increased. This study focuses on solving a chambering student-case assignment problem by using a simulated annealing algorithm where this problem is classified under project assignment problem. The project assignment problem is considered as hard combinatorial optimization problem and solving it using a metaheuristic approach is an advantage because it could return a good solution in a reasonable time. The problem of assigning chambering students to cases has never been addressed in the literature before. For the proposed problem, it is essential for law graduates to peruse in chambers before they are qualified to become legal counselor. Thus, assigning the chambering students to cases is a critically needed especially when involving many preferences. Hence, this study presents a preliminary study of the proposed project assignment problem. The objective of the study is to minimize the total completion time for all students in solving the given cases. This study employed a minimum cost greedy heuristic in order to construct a feasible initial solution. The search then is preceded with a simulated annealing algorithm for further improvement of solution quality. The analysis of the obtained result has shown that the proposed simulated annealing algorithm has greatly improved the solution constructed by the minimum cost greedy heuristic. Hence, this research has demonstrated the advantages of solving project assignment problem by using metaheuristic techniques.

  10. Efficient Mechanisms to Allocate Assignment Incentives in the Navy

    National Research Council Canada - National Science Library

    Nimon, R. W; Hall, Ricky D; Zaki, Hossam

    2005-01-01

    .... All assignments, however, may not necessarily be voluntary. These assignments (jobs) have been labeled as "hard to fill" by Navy leadership, and the Navy has implemented market-based, cash stipends to attract Sailors to these jobs...

  11. Ant Colony Algorithm and Simulation for Robust Airport Gate Assignment

    Directory of Open Access Journals (Sweden)

    Hui Zhao

    2014-01-01

    Full Text Available Airport gate assignment is core task for airport ground operations. Due to the fact that the departure and arrival time of flights may be influenced by many random factors, the airport gate assignment scheme may encounter gate conflict and many other problems. This paper aims at finding a robust solution for airport gate assignment problem. A mixed integer model is proposed to formulate the problem, and colony algorithm is designed to solve this model. Simulation result shows that, in consideration of robustness, the ability of antidisturbance for airport gate assignment scheme has much improved.

  12. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  13. Two fuzzy possibilistic bi-objective zero-one programming models for outsourcing the equipment maintenance problem

    Science.gov (United States)

    Vahdani, Behnam; Jolai, Fariborz; Tavakkoli-Moghaddam, Reza; Meysam Mousavi, S.

    2012-07-01

    Maintenance outsourcing can be regarded as a strategic weapon to increase productivity and customer satisfaction in many companies, and this critical activity can be performed in a more efficient and effective way. This article presents two novel fuzzy possibilistic bi-objective zero-one programming (FPBOZOP) models for outsourcing of the equipment maintenance. In these models, cost parameters, including outsourcing cost, risk cost, time operations for performing the equipment maintenance and reliability level, as well as other influential parameters are considered through the outsourcing process. Moreover, the presented models can measure the capability of the company in doing different activities, unlike previous studies, in order to see the possibility of maintenance in-house, and can lead to make a best decision on the basis of the models' results. Both models are developed under uncertainty, which bring top managers the possibility of assigning more than one equipment or project to the supplier so that the profit is maximized, and the cost is minimized by considering bi-objectives concurrently. Then, a new fuzzy mathematical programming based possibilistic approach is introduced as a solution methodology from the recent literature to solve the proposed bi-objective zero-one programming (BOZOP) models and to reach a preferred compromise solution. Furthermore, a real-case study is utilized to demonstrate and to validate the effectiveness of the presented models. The computational results revealed that the models can be implemented in variety of problems in the domain of the equipment maintenance outsourcing and project outsourcing either from theory or application perspectives.

  14. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  15. Assigning agents to a line

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Moreno-Ternero, Juan D.; Østerdal, Lars Peter Raahave

    2014-01-01

    minimizing modification of the classic random priority method to solve this class of problems. We also provide some logical relations in our setting among standard axioms in the literature on assignment problems, and explore the robustness of our results to several extensions of our setting....

  16. The ICAP (Interactive Course Assignment Pages Publishing System

    Directory of Open Access Journals (Sweden)

    Kim Griggs

    2008-03-01

    Full Text Available The ICAP publishing system is an open source custom content management system that enables librarians to easily and quickly create and manage library help pages for course assignments (ICAPs, without requiring knowledge of HTML or other web technologies. The system's unique features include an emphasis on collaboration and content reuse and an easy-to-use interface that includes in-line help, simple forms and drag and drop functionality. The system generates dynamic, attractive course assignment pages that blend Web 2.0 features with traditional library resources, and makes the pages easier to find by providing a central web page for the course assignment pages. As of December 2007, the code is available as free, open-source software under the GNU General Public License.

  17. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  18. Covariance NMR Processing and Analysis for Protein Assignment.

    Science.gov (United States)

    Harden, Bradley J; Frueh, Dominique P

    2018-01-01

    During NMR resonance assignment it is often necessary to relate nuclei to one another indirectly, through their common correlations to other nuclei. Covariance NMR has emerged as a powerful technique to correlate such nuclei without relying on error-prone peak peaking. However, false-positive artifacts in covariance spectra have impeded a general application to proteins. We recently introduced pre- and postprocessing steps to reduce the prevalence of artifacts in covariance spectra, allowing for the calculation of a variety of 4D covariance maps obtained from diverse combinations of pairs of 3D spectra, and we have employed them to assign backbone and sidechain resonances in two large and challenging proteins. In this chapter, we present a detailed protocol describing how to (1) properly prepare existing 3D spectra for covariance, (2) understand and apply our processing script, and (3) navigate and interpret the resulting 4D spectra. We also provide solutions to a number of errors that may occur when using our script, and we offer practical advice when assigning difficult signals. We believe such 4D spectra, and covariance NMR in general, can play an integral role in the assignment of NMR signals.

  19. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  20. Genetics of traffic assignment models for strategic transport planning

    NARCIS (Netherlands)

    Bliemer, M.C.J.; Raadsen, M.P.H.; Brederode, L.J.N.; Bell, M.G.H.; Wismans, Luc Johannes Josephus; Smith, M.J.

    2016-01-01

    This paper presents a review and classification of traffic assignment models for strategic transport planning purposes by using concepts analogous to genetics in biology. Traffic assignment models share the same theoretical framework (DNA), but differ in capability (genes). We argue that all traffic

  1. Radiation protection instrumentation. Monitoring equipment. Radioactive aerosols in the environment

    International Nuclear Information System (INIS)

    1996-01-01

    This international standard applies to portable or installed equipment for continuous monitoring of radioactive aerosols in the environment in normal and emergency conditions. Monitoring involves continuous sampling and, where desirable, automatic start of sampling. The document applies particularly to the following assignments: (i) determination of the volume activity of radionuclides in the form of aerosols, either per time unit, along with its time changes, or in the integral form over a longer time period such as 24 h, and measurement of the volume sampled; (ii) triggering a warning alarm signal if the preset volume activity or time integral of the volume activity of aerosols has been exceeded. The document deals with radioactive aerosol monitor design, testing procedures, and documentation. Appended tables refer to the reference and normal testing conditions, tests in normal testing conditions, tests during changes of the affecting quantities, and tests of the air circuit. (P.A.)

  2. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  3. Not just a rural occurrence: differences in agricultural equipment crash characteristics by rural-urban crash site and proximity to town.

    Science.gov (United States)

    Harland, Karisa K; Greenan, Mitchell; Ramirez, Marizen

    2014-09-01

    Although approximately one-third of agricultural equipment-related crashes occur near town, these crashes are thought to be a rural problem. This analysis examines differences between agricultural equipment-related crashes by their urban-rural distribution and distance from a town. Agricultural equipment crashes were collected from nine Midwest Departments of Transportation (2005-2008). Crash zip code was assigned as urban or rural (large, small and isolated) using Rural-Urban Commuting Areas. Crash proximity to a town was estimated with ArcGIS. Multivariable logistic regression was used to estimate the odds of crashing in an urban versus rural zip codes and across rural gradients. ANOVA analysis estimated mean distance (miles) from a crash site to a town. Over four years, 4444 crashes involved agricultural equipment. About 30% of crashes occurred in urban zip codes. Urban crashes were more likely to be non-collisions (aOR=1.69[1.24-2.30]), involve ≥2 vehicles (2 vehicles: aOR=1.58[1.14-2.20], 3+ vehicles: aOR=1.68[0.98-2.88]), occur in a town (aOR=2.06[1.73-2.45]) and within one mile of a town (aOR=1.65[1.40-1.95]) than rural crashes. The proportion of crashes within a town differed significantly across rural gradients (Purban-rural distribution (Pagricultural equipment are unexpectedly common in urban areas and near towns and cities. Education among all roadway users, increased visibility of agricultural equipment and the development of complete rural roads are needed to increase road safety and prevent agricultural equipment-related crashes. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. Designing Internet research assignments: building a framework for instructor collaboration

    Directory of Open Access Journals (Sweden)

    David Ward

    2000-01-01

    Full Text Available Internet knowledge is increasing steadily among instructors in the academic world. As courses incorporate more instructional technology, traditional undergraduate research assignments are adapting to reflect the changing world of information and information access. New library assignments reflect this shift as well, with term papers and research projects asking students to use Web sites as an information resource, in addition to the standard literature of periodicals and monographs. But the many pitfalls the library profession has learned in its own metamorphosis during the past decade are often repeated in these newer course assignments. The authors in this paper present a framework for librarians to interact with instructors to incorporate Internet resources into traditional term paper and research assignments. They suggest a framework for creating sample assignments librarians can take to campus instructional units, to show the teaching community at large what the library profession has learned from first-hand experience.

  5. Postgraduate diploma collaborative assignment: Implications for ...

    African Journals Online (AJOL)

    Postgraduate diploma collaborative assignment: Implications for ESL students ... and collaborative teaching/learning model involving the major course convenors. ... The quality of the work and mood of all concerned improved tremendously.

  6. Automated backbone assignment of labeled proteins using the threshold accepting algorithm

    International Nuclear Information System (INIS)

    Leutner, Michael; Gschwind, Ruth M.; Liermann, Jens; Schwarz, Christian; Gemmecker, Gerd; Kessler, Horst

    1998-01-01

    The sequential assignment of backbone resonances is the first step in the structure determination of proteins by heteronuclear NMR. For larger proteins, an assignment strategy based on proton side-chain information is no longer suitable for the use in an automated procedure. Our program PASTA (Protein ASsignment by Threshold Accepting) is therefore designed to partially or fully automate the sequential assignment of proteins, based on the analysis of NMR backbone resonances plus C β information. In order to overcome the problems caused by peak overlap and missing signals in an automated assignment process, PASTA uses threshold accepting, a combinatorial optimization strategy, which is superior to simulated annealing due to generally faster convergence and better solutions. The reliability of this algorithm is shown by reproducing the complete sequential backbone assignment of several proteins from published NMR data. The robustness of the algorithm against misassigned signals, noise, spectral overlap and missing peaks is shown by repeating the assignment with reduced sequential information and increased chemical shift tolerances. The performance of the program on real data is finally demonstrated with automatically picked peak lists of human nonpancreatic synovial phospholipase A 2 , a protein with 124 residues

  7. Assigning spectra of chaotic molecules with diabatic correlation diagrams

    International Nuclear Information System (INIS)

    Rose, J.P.; Kellman, M.E.

    1996-01-01

    An approach for classifying and organizing spectra of highly excited vibrational states of molecules is investigated. As a specific example, we analyze the spectrum of an effective spectroscopic fitting Hamiltonian for H 2 O. In highly excited spectra, multiple resonance couplings and anharmonicity interact to give branching of the N original normal modes into new anharmonic modes, accompanied by the onset of widespread chaos. The anharmonic modes are identified by means of a bifurcation analysis of the spectroscopic Hamiltonian. A diabatic correlation diagram technique is developed to assign the levels with approximate open-quote open-quote dynamical close-quote close-quote quantum numbers corresponding to the dynamics determined from the bifurcation analysis. The resulting assignment shows significant disturbance from the conventional spectral pattern organization into sequences and progressions. The open-quote open-quote dynamical close-quote close-quote assignment is then converted into an assignment in terms of open-quote open-quote nominal close-quote close-quote quantum numbers that function like the N normal mode quantum numbers at low energy. The nominal assignments are used to reconstruct, as much as possible, an organization of the spectrum resembling the usual separation into sequences and progressions. copyright 1996 American Institute of Physics

  8. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  9. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  10. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  11. Parentage assignment of progeny in mixed milt fertilization of ...

    African Journals Online (AJOL)

    Administrator

    2011-06-13

    Jun 13, 2011 ... individuals. Overall, 98.8% of progeny were assigned to their parents using Family Assignment. Program (FAP). Selection of hyper-variable microsatellites in Caspian brown trout to identify unique alleles was effective for unambiguous parentage determination and estimation of genetic diversity in this study.

  12. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  13. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  14. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  15. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  16. Integrating Academic Journal Review Assignments into a Graduate Business Leadership Course

    Science.gov (United States)

    Schultz, Jennifer L.; Agrimonti, Lisa M.; Higbee, Jeanne L.

    2016-01-01

    Graduate course assignments that are pragmatic, challenging, scaffold prior learning, and support academic career aspirations can be difficult to create and even more problematic to assess for even the most experienced faculty. This paper presents a class assignment that incorporated a real-world journal reviewing assignment into an elective…

  17. 20 CFR 422.104 - Who can be assigned a social security number.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Who can be assigned a social security number... General Procedures § 422.104 Who can be assigned a social security number. (a) Persons eligible for SSN assignment. We can assign you a social security number if you meet the evidence requirements in § 422.107 and...

  18. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  19. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  20. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  1. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  2. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  3. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  4. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  5. 32 CFR 644.396 - Assignment of personnel to administer.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Assignment of personnel to administer. 644.396... PROPERTY REAL ESTATE HANDBOOK Disposal Predisposal Action § 644.396 Assignment of personnel to administer... responsible representative to each installation, or group of installations, to act under his staff supervision...

  6. A Poster Assignment Connects Information Literacy and Writing Skills

    Science.gov (United States)

    Waters, Natalie

    2015-01-01

    This paper describes the implementation of a poster assignment in a writing and information literacy course required for undergraduate Life Sciences and Environmental Biology majors with the Faculty of Agricultural and Environmental Sciences at McGill University. The assignment was introduced in response to weaknesses identified through course…

  7. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  8. 42 CFR 421.114 - Assignment and reassignment of providers by CMS.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Assignment and reassignment of providers by CMS. 421.114 Section 421.114 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH... Assignment and reassignment of providers by CMS. CMS may assign or reassign any provider to any intermediary...

  9. 28 CFR 0.153 - Selection and assignment of employees for training.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Selection and assignment of employees for... Selection and assignment of employees for training. The Director of the Federal Bureau of Investigation, the....S.C. 4109, with respect to the selection and assignment of employees for training by, in, or through...

  10. 26 CFR 1.401(a)-13 - Assignment or alienation of benefits.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Assignment or alienation of benefits. 1.401(a...)-13 Assignment or alienation of benefits. (a) Scope of the regulations. This section applies only to..., provided for employer contributions. (b) No assignment or alienation—(1) General rule. Under section 401(a...

  11. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  12. DNATCO: assignment of DNA conformers at dnatco.org.

    Science.gov (United States)

    Černý, Jiří; Božíková, Paulína; Schneider, Bohdan

    2016-07-08

    The web service DNATCO (dnatco.org) classifies local conformations of DNA molecules beyond their traditional sorting to A, B and Z DNA forms. DNATCO provides an interface to robust algorithms assigning conformation classes called NTC: to dinucleotides extracted from DNA-containing structures uploaded in PDB format version 3.1 or above. The assigned dinucleotide NTC: classes are further grouped into DNA structural alphabet NTA: , to the best of our knowledge the first DNA structural alphabet. The results are presented at two levels: in the form of user friendly visualization and analysis of the assignment, and in the form of a downloadable, more detailed table for further analysis offline. The website is free and open to all users and there is no login requirement. © The Author(s) 2016. Published by Oxford University Press on behalf of Nucleic Acids Research.

  13. Effective Homework Assignments. Research Brief

    Science.gov (United States)

    Cooper, Harris

    2008-01-01

    Perhaps more than any question other than "How much time should students spend doing homework?" parents and educators want to know, "What kinds of homework assignments are most effective?" Clearly, the answers to this question vary according to many factors, especially the developmental level of students and the topic area. Generally, answers are…

  14. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  15. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  16. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  17. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  18. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  19. Dynamic traffic assignment : genetic algorithms approach

    Science.gov (United States)

    1997-01-01

    Real-time route guidance is a promising approach to alleviating congestion on the nations highways. A dynamic traffic assignment model is central to the development of guidance strategies. The artificial intelligence technique of genetic algorithm...

  20. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  1. On some special cases of the restricted assignment problem

    NARCIS (Netherlands)

    Wang, C. (Chao); R.A. Sitters (René)

    2016-01-01

    textabstractWe consider some special cases of the restricted assignment problem. In this scheduling problem on parallel machines, any job j can only be assigned to one of the machines in its given subset Mj of machines. We give an LP-formulation for the problem with two job sizes and show that it

  2. 13 CFR 500.210 - Assignment or transfer of loans.

    Science.gov (United States)

    2010-01-01

    ... has the effect of distributing the risks of the credit among other Lenders if: (i) Neither the loan... be modified, assigned, conveyed, sold or otherwise transferred by the Lender, in whole or in part... assignment or transfer of less than 100 percent of a Lender's interest in the Loan Documents and Guarantee...

  3. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  4. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  5. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  6. A parametric visualization software for the assignment problem

    Directory of Open Access Journals (Sweden)

    Papamanthou Charalampos

    2005-01-01

    Full Text Available In this paper we present a parametric visualization software used to assist the teaching of the Network Primal Simplex Algorithm for the assignment problem (AP. The assignment problem is a special case of the balanced transportation problem. The main functions of the algorithm and design techniques are also presented. Through this process, we aim to underline the importance and necessity of using such educational methods in order to improve the teaching of Computer Algorithms.

  7. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  8. The Utility of Writing Assignments in Undergraduate Bioscience

    Science.gov (United States)

    Libarkin, Julie; Ording, Gabriel

    2012-01-01

    We tested the hypothesis that engagement in a few, brief writing assignments in a nonmajors science course can improve student ability to convey critical thought about science. A sample of three papers written by students (n = 30) was coded for presence and accuracy of elements related to scientific writing. Scores for different aspects of scientific writing were significantly correlated, suggesting that students recognized relationships between components of scientific thought. We found that students' ability to write about science topics and state conclusions based on data improved over the course of three writing assignments, while the abilities to state a hypothesis and draw clear connections between human activities and environmental impacts did not improve. Three writing assignments generated significant change in student ability to write scientifically, although our results suggest that three is an insufficient number to generate complete development of scientific writing skills. PMID:22383616

  9. A search asymmetry reversed by figure-ground assignment.

    Science.gov (United States)

    Humphreys, G W; Müller, H

    2000-05-01

    We report evidence demonstrating that a search asymmetry favoring concave over convex targets can be reversed by altering the figure-ground assignment of edges in shapes. Visual search for a concave target among convex distractors is faster than search for a convex target among concave distractors (a search asymmetry). By using shapes with ambiguous local figure-ground relations, we demonstrated that search can be efficient (with search slopes around 10 ms/item) or inefficient (with search slopes around 30-40 ms/item) with the same stimuli, depending on whether edges are assigned to concave or convex "figures." This assignment process can operate in a top-down manner, according to the task set. The results suggest that attention is allocated to spatial regions following the computation of figure-ground relations in parallel across the elements present. This computation can also be modulated by top-down processes.

  10. Interactive Level Design for iOS Assignment Delivery: A Case Study

    Directory of Open Access Journals (Sweden)

    Anson Brown

    2014-02-01

    Full Text Available This paper presents an application of an iOS-based online gaming assignment in a real classroom. The core concept of the project is a gameplay environment involving two players that have full control over creation and modification of levels. This level design mechanism was implemented in an iOS-based game in the area of genetics and based on an existing written assignment. The game includes support for both instructors, who have the ability to create and post assignments and students, who can take the assignments. Two trials of the iOS application consisted of in-class testing of twenty- one students. Students first took the original paper assignment, followed by the iOS version. Start times, end times, and grades were recorded for both versions. A comprehensive study of the grades and times for the iOS version of the assignment versus the paper version was conducted and is presented in this paper. Our Study showed that the iOS version was completed much faster in nearly every case while a strong delivery mechanism is needed to ensure student grades and completion of the assignment will not be affected. These results are not unexpected due to some major difference between the two formats. Future updates and additions will address any currently existing issues.

  11. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  12. 14 CFR 1245.109 - Assignment of title to NASA.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Assignment of title to NASA. 1245.109... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.109 Assignment of title to NASA. (a) The instrument of waiver set forth in § 1245.115(c) shall be voided by NASA with respect to the domestic title to...

  13. Cue competition affects temporal dynamics of edge-assignment in human visual cortex.

    Science.gov (United States)

    Brooks, Joseph L; Palmer, Stephen E

    2011-03-01

    Edge-assignment determines the perception of relative depth across an edge and the shape of the closer side. Many cues determine edge-assignment, but relatively little is known about the neural mechanisms involved in combining these cues. Here, we manipulated extremal edge and attention cues to bias edge-assignment such that these two cues either cooperated or competed. To index their neural representations, we flickered figure and ground regions at different frequencies and measured the corresponding steady-state visual-evoked potentials (SSVEPs). Figural regions had stronger SSVEP responses than ground regions, independent of whether they were attended or unattended. In addition, competition and cooperation between the two edge-assignment cues significantly affected the temporal dynamics of edge-assignment processes. The figural SSVEP response peaked earlier when the cues causing it cooperated than when they competed, but sustained edge-assignment effects were equivalent for cooperating and competing cues, consistent with a winner-take-all outcome. These results provide physiological evidence that figure-ground organization involves competitive processes that can affect the latency of figural assignment.

  14. Task assignment and coaching

    OpenAIRE

    Dominguez-Martinez, S.

    2009-01-01

    An important task of a manager is to motivate her subordinates. One way in which a manager can give incentives to junior employees is through the assignment of tasks. How a manager allocates tasks in an organization, provides information to the junior employees about his ability. Without coaching from a manager, the junior employee only has information about his past performance. Based on his past performance, a talented junior who has performed a difficult task sometimes decides to leave the...

  15. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  16. Implementing a cornerstone of culture change: Consistent staff assignment in VHA community living centers.

    Science.gov (United States)

    Lemke, Sonne; Brennan, Penny L; SooHoo, Sonya; Schutte, Kathleen K

    2017-08-01

    In 2011, the Veterans Health Administration (VHA) began implementing consistent staff assignment in its nursing homes (called Community Living Centers or CLCs). Consistent assignment, a cornerstone of culture change, minimizes the number of staff who provide a resident's care. The present research assessed the level and stability of consistent assignment in units within VHA CLCs and identified unit characteristics related to implementation of this staff assignment model. Schedulers in 185 of 335 organizational units that make up VHA CLCs completed a Staffing Practices Survey. For the month prior to the survey, 53% of CLC units had full implementation of consistent assignment. Tracked back over time, 37% of CLC units had stable high consistent assignment, 29% had stable low consistent assignment, and 34% were variable. Units with stable high consistent assignment were most likely to use care teams with stable membership and to obtain staff input for care assignments. Schedulers in these units reported more positive experiences with consistent staff assignment and better unit functioning in terms of staff absences, complaints about workload fairness, and resolution of scheduling problems. Units with stable low and variable consistent assignment were similar in most of these respects; however, units with variable consistent assignment made greater use of stable care teams and were less likely to change assignments at a staff member's request. Overall, consistent assignment implementation was not related to unit size, nursing hours per resident day, or specialty focus. Findings can help guide consistent staff assignment implementation in VHA and community nursing homes. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  17. The impact of taxation on international assignment decisions: A principal-agent approach

    OpenAIRE

    Martini, Jan Thomas; Niemann, Rainer

    2013-01-01

    In many industries like management consulting, IT consulting, or construction highly qualified employees, i.e., experts or executive managers, have to be assigned to temporary projects. In firms with many employees and various different projects, this assignment decision involves a complex optimization procedure. Obviously, the employees’ productivities in the respective projects are crucial for the employer’s optimal assignment decision, but assignment can also be affected by risk-incent...

  18. Automated Bug Assignment: Ensemble-based Machine Learning in Large Scale Industrial Contexts

    OpenAIRE

    Jonsson, Leif; Borg, Markus; Broman, David; Sandahl, Kristian; Eldh, Sigrid; Runeson, Per

    2016-01-01

    Bug report assignment is an important part of software maintenance. In particular, incorrect assignments of bug reports to development teams can be very expensive in large software development projects. Several studies propose automating bug assignment techniques using machine learning in open source software contexts, but no study exists for large-scale proprietary projects in industry. The goal of this study is to evaluate automated bug assignment techniques that are based on machine learni...

  19. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  20. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  1. An integer programming model for gate assignment problem at airline terminals

    Science.gov (United States)

    Chun, Chong Kok; Nordin, Syarifah Zyurina

    2015-05-01

    In this paper, we concentrate on a gate assignment problem (GAP) at the airlines terminal. Our problem is to assign an arrival plane to a suitable gate. There are two considerations needed to take. One of its is passenger walking distance from arrival gate to departure gate while another consideration is the transport baggage distance from one gate to another. Our objective is to minimize the total distance between the gates that related to assign the arrival plane to the suitable gates. An integer linear programming (ILP) model is proposed to solve this gate assignment problem. We also conduct a computational experiment using CPLEX 12.1 solver in AIMMS 3.10 software to analyze the performance of the model. Results of the computational experiments are presented. The efficiency of flights assignment is depends on the ratio of the weight for both total passenger traveling distances and total baggage transport distances.

  2. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  3. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  4. Automated solid-state NMR resonance assignment of protein microcrystals and amyloids

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Elena [Goethe University Frankfurt am Main, Center for Biomolecular Magnetic Resonance, Institute of Biophysical Chemistry (Germany); Gath, Julia [ETH Zurich, Physical Chemistry (Switzerland); Habenstein, Birgit [UMR 5086 CNRS/Universite de Lyon 1, Institut de Biologie et Chimie des Proteines (France); Ravotti, Francesco; Szekely, Kathrin; Huber, Matthias [ETH Zurich, Physical Chemistry (Switzerland); Buchner, Lena [Goethe University Frankfurt am Main, Center for Biomolecular Magnetic Resonance, Institute of Biophysical Chemistry (Germany); Boeckmann, Anja, E-mail: a.bockmann@ibcp.fr [UMR 5086 CNRS/Universite de Lyon 1, Institut de Biologie et Chimie des Proteines (France); Meier, Beat H., E-mail: beme@ethz.ch [ETH Zurich, Physical Chemistry (Switzerland); Guentert, Peter, E-mail: guentert@em.uni-frankfurt.de [Goethe University Frankfurt am Main, Center for Biomolecular Magnetic Resonance, Institute of Biophysical Chemistry (Germany)

    2013-07-15

    Solid-state NMR is an emerging structure determination technique for crystalline and non-crystalline protein assemblies, e.g., amyloids. Resonance assignment constitutes the first and often very time-consuming step to a structure. We present ssFLYA, a generally applicable algorithm for automatic assignment of protein solid-state NMR spectra. Application to microcrystals of ubiquitin and the Ure2 prion C-terminal domain, as well as amyloids of HET-s(218-289) and {alpha}-synuclein yielded 88-97 % correctness for the backbone and side-chain assignments that are classified as self-consistent by the algorithm, and 77-90 % correctness if also assignments classified as tentative by the algorithm are included.

  5. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  6. Web-Based Problem-Solving Assignment and Grading System

    Science.gov (United States)

    Brereton, Giles; Rosenberg, Ronald

    2014-11-01

    In engineering courses with very specific learning objectives, such as fluid mechanics and thermodynamics, it is conventional to reinforce concepts and principles with problem-solving assignments and to measure success in problem solving as an indicator of student achievement. While the modern-day ease of copying and searching for online solutions can undermine the value of traditional assignments, web-based technologies also provide opportunities to generate individualized well-posed problems with an infinite number of different combinations of initial/final/boundary conditions, so that the probability of any two students being assigned identical problems in a course is vanishingly small. Such problems can be designed and programmed to be: single or multiple-step, self-grading, allow students single or multiple attempts; provide feedback when incorrect; selectable according to difficulty; incorporated within gaming packages; etc. In this talk, we discuss the use of a homework/exam generating program of this kind in a single-semester course, within a web-based client-server system that ensures secure operation.

  7. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  8. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  9. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  10. Lower region: a new cue for figure-ground assignment.

    Science.gov (United States)

    Vecera, Shaun P; Vogel, Edward K; Woodman, Geoffrey F

    2002-06-01

    Figure-ground assignment is an important visual process; humans recognize, attend to, and act on figures, not backgrounds. There are many visual cues for figure-ground assignment. A new cue to figure-ground assignment, called lower region, is presented: Regions in the lower portion of a stimulus array appear more figurelike than regions in the upper portion of the display. This phenomenon was explored, and it was demonstrated that the lower-region preference is not influenced by contrast, eye movements, or voluntary spatial attention. It was found that the lower region is defined relative to the stimulus display, linking the lower-region preference to pictorial depth perception cues. The results are discussed in terms of the environmental regularities that this new figure-ground cue may reflect.

  11. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  12. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  13. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  14. Tool management in manufacturing systems equipped with CNC machines

    Directory of Open Access Journals (Sweden)

    Giovanni Tani

    1997-12-01

    Full Text Available This work has been carried out for the purpose of realizing an automated system for the integrated management of tools within a company. By integrating planning, inspection and tool-room functions, automated tool management can ensure optimum utilization of tools on the selected machines, guaranteeing their effective availability. The first stage of the work consisted of defining and developing a Tool Management System whose central nucleus is a unified Data Base for all of the tools, forming part of the company's Technological Files (files on machines, materials, equipment, methods, etc., interfaceable with all of the company departments that require information on tools. The system assigns code numbers to the individual components of the tools and file them on the basis of their morphological and functional characteristics. The system is also designed to effect assemblies of tools, from which are obtained the "Tool Cards" required for compiling working cycles (CAPP, for CAM programming and for the Tool-room where the tools are physically prepared. Methods for interfacing with suitable systems for the aforesaid functions have also been devised

  15. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  16. 75 FR 55352 - Delegation of Authorities and Assignment of Responsibilities

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF LABOR Office of the Secretary Delegation of Authorities and Assignment of Responsibilities Secretary's Order 5-2010 Subject: Delegation of Authorities and Assignment of Responsibilities to... rather than the Administrator, WHD (see also Secretary's Order 3-2010). 5. Delegations of Authority and...

  17. Smartnotebook: A semi-automated approach to protein sequential NMR resonance assignments

    International Nuclear Information System (INIS)

    Slupsky, Carolyn M.; Boyko, Robert F.; Booth, Valerie K.; Sykes, Brian D.

    2003-01-01

    Complete and accurate NMR spectral assignment is a prerequisite for high-throughput automated structure determination of biological macromolecules. However, completely automated assignment procedures generally encounter difficulties for all but the most ideal data sets. Sources of these problems include difficulty in resolving correlations in crowded spectral regions, as well as complications arising from dynamics, such as weak or missing peaks, or atoms exhibiting more than one peak due to exchange phenomena. Smartnotebook is a semi-automated assignment software package designed to combine the best features of the automated and manual approaches. The software finds and displays potential connections between residues, while the spectroscopist makes decisions on which connection is correct, allowing rapid and robust assignment. In addition, smartnotebook helps the user fit chains of connected residues to the primary sequence of the protein by comparing the experimentally determined chemical shifts with expected shifts derived from a chemical shift database, while providing bookkeeping throughout the assignment procedure

  18. ZAP: a distributed channel assignment algorithm for cognitive radio networks

    Directory of Open Access Journals (Sweden)

    Munaretto Anelise

    2011-01-01

    Full Text Available Abstract We propose ZAP, an algorithm for the distributed channel assignment in cognitive radio (CR networks. CRs are capable of identifying underutilized licensed bands of the spectrum, allowing their reuse by secondary users without interfering with primary users. In this context, efficient channel assignment is challenging as ideally it must be simple, incur acceptable communication overhead, provide timely response, and be adaptive to accommodate frequent changes in the network. Another challenge is the optimization of network capacity through interference minimization. In contrast to related work, ZAP addresses these challenges with a fully distributed approach based only on local (neighborhood knowledge, while significantly reducing computational costs and the number of messages required for channel assignment. Simulations confirm the efficiency of ZAP in terms of (i the performance tradeoff between different metrics and (ii the fast achievement of a suitable assignment solution regardless of network size and density.

  19. Strategy-Proof Assignment Of Multiple Resources

    DEFF Research Database (Denmark)

    Erlanson, Albin; Szwagrzak, Karol

    2015-01-01

    We examine the strategy-proof allocation of multiple resources; an application is the assignment of packages of tasks, workloads, and compensations among the members of an organization. In the domain of multidimensional single-peaked preferences, we find that any allocation mechanism obtained by ...

  20. Statistical aspects of optimal treatment assignment

    NARCIS (Netherlands)

    van der Linden, Willem J.

    The issues of treatment assignment is ordinarily dealt with within the framework of testing aptitude treatment interaction (ATI) hypothesis. ATI research mostly uses linear regression techniques, and an ATI exists when the aptitude treatment (AT) regression lines cross each other within the relevant

  1. Privacy-Preserving Task Assignment in Spatial Crowdsourcing

    KAUST Repository

    Liu, An; Li, Zhi-Xu; Liu, Guan-Feng; Zheng, Kai; Zhang, Min; Li, Qing; Zhang, Xiangliang

    2017-01-01

    untrusted SC systems. In this paper, we study the problem of assigning workers to tasks in a way that location privacy for both workers and task requesters is preserved. We first combine the Paillier cryptosystem with Yao’s garbled circuits to construct a secure protocol that assigns the nearest worker to a task. Considering that this protocol cannot scale to a large number of workers, we then make use of Geohash, a hierarchical spatial index to design a more efficient protocol that can securely find approximate nearest workers. We theoretically show that these two protocols are secure against semi-honest adversaries. Through extensive experiments on two real-world datasets, we demonstrate the efficiency and effectiveness of our protocols.

  2. Automated solid-state NMR resonance assignment of protein microcrystals and amyloids

    International Nuclear Information System (INIS)

    Schmidt, Elena; Gath, Julia; Habenstein, Birgit; Ravotti, Francesco; Székely, Kathrin; Huber, Matthias; Buchner, Lena; Böckmann, Anja; Meier, Beat H.; Güntert, Peter

    2013-01-01

    Solid-state NMR is an emerging structure determination technique for crystalline and non-crystalline protein assemblies, e.g., amyloids. Resonance assignment constitutes the first and often very time-consuming step to a structure. We present ssFLYA, a generally applicable algorithm for automatic assignment of protein solid-state NMR spectra. Application to microcrystals of ubiquitin and the Ure2 prion C-terminal domain, as well as amyloids of HET-s(218–289) and α-synuclein yielded 88–97 % correctness for the backbone and side-chain assignments that are classified as self-consistent by the algorithm, and 77–90 % correctness if also assignments classified as tentative by the algorithm are included

  3. A feedback model of figure-ground assignment.

    Science.gov (United States)

    Domijan, Drazen; Setić, Mia

    2008-05-30

    A computational model is proposed in order to explain how bottom-up and top-down signals are combined into a unified perception of figure and background. The model is based on the interaction between the ventral and the dorsal stream. The dorsal stream computes saliency based on boundary signals provided by the simple and the complex cortical cells. Output from the dorsal stream is projected to the surface network which serves as a blackboard on which the surface representation is formed. The surface network is a recurrent network which segregates different surfaces by assigning different firing rates to them. The figure is labeled by the maximal firing rate. Computer simulations showed that the model correctly assigns figural status to the surface with a smaller size, a greater contrast, convexity, surroundedness, horizontal-vertical orientation and a higher spatial frequency content. The simple gradient of activity in the dorsal stream enables the simulation of the new principles of the lower region and the top-bottom polarity. The model also explains how the exogenous attention and the endogenous attention may reverse the figural assignment. Due to the local excitation in the surface network, neural activity at the cued region will spread over the whole surface representation. Therefore, the model implements the object-based attentional selection.

  4. AN EVOLUTIONARY ALGORITHM FOR CHANNEL ASSIGNMENT PROBLEM IN WIRELESS MOBILE NETWORKS

    Directory of Open Access Journals (Sweden)

    Yee Shin Chia

    2012-12-01

    Full Text Available The channel assignment problem in wireless mobile network is the assignment of appropriate frequency spectrum to incoming calls while maintaining a satisfactory level of electromagnetic compatibility (EMC constraints. An effective channel assignment strategy is important due to the limited capacity of frequency spectrum in wireless mobile network. Most of the existing channel assignment strategies are based on deterministic methods. In this paper, an adaptive genetic algorithm (GA based channel assignment strategy is introduced for resource management and to reduce the effect of EMC interferences. The most significant advantage of the proposed optimization method is its capability to handle both the reassignment of channels for existing calls as well as the allocation of channel to a new incoming call in an adaptive process to maximize the utility of the limited resources. It is capable to adapt the population size to the number of eligible channels for a particular cell upon new call arrivals to achieve reasonable convergence speed. The MATLAB simulation on a 49-cells network model for both uniform and nonuniform call traffic distributions showed that the proposed channel optimization method can always achieve a lower average new incoming call blocking probability compared to the deterministic based channel assignment strategy.

  5. The "Outsider/Insider" Assignment: A Pedagogical Innovation for Teaching Cross-Cultural Understanding

    Science.gov (United States)

    Garcia, Angela Cora

    2014-01-01

    In this paper, I describe an innovative assignment for teaching undergraduate students cross-cultural understanding. The Outsider/Insider assignment simultaneously teaches facts about cultural difference and skills for managing cross-cultural encounters. Briefly, the assignment is to write two short papers, one in which the student describes a…

  6. Moving beyond "Bookish Knowledge": Using Film-Based Assignments to Promote Deep Learning

    Science.gov (United States)

    Olson, Joann S.; Autry, Linda; Moe, Jeffry

    2016-01-01

    This article investigates the effectiveness of a film-based assignment given to adult learners in a graduate-level group counseling class. Semi-structured interviews were conducted with four students; data analysis suggested film-based assignments may promote deep approaches to learning (DALs). Participants indicated the assignment helped them…

  7. Tabu search for target-radar assignment

    DEFF Research Database (Denmark)

    Hindsberger, Magnus; Vidal, Rene Victor Valqui

    2000-01-01

    In the paper the problem of assigning air-defense illumination radars to enemy targets is presented. A tabu search metaheuristic solution is described and the results achieved are compared to those of other heuristic approaches, implementation and experimental aspects are discussed. It is argued ...

  8. Semi-infinite assignment and transportation games

    NARCIS (Netherlands)

    Timmer, Judith B.; Sánchez-Soriano, Joaqu´ın; Llorca, Navidad; Tijs, Stef; Goberna, Miguel A.; López, Marco A.

    2001-01-01

    Games corresponding to semi-infinite transportation and related assignment situations are studied. In a semi-infinite transportation situation, one aims at maximizing the profit from the transportation of a certain good from a finite number of suppliers to an infinite number of demanders. An

  9. Single machine scheduling with slack due dates assignment

    Science.gov (United States)

    Liu, Weiguo; Hu, Xiangpei; Wang, Xuyin

    2017-04-01

    This paper considers a single machine scheduling problem in which each job is assigned an individual due date based on a common flow allowance (i.e. all jobs have slack due date). The goal is to find a sequence for jobs, together with a due date assignment, that minimizes a non-regular criterion comprising the total weighted absolute lateness value and common flow allowance cost, where the weight is a position-dependent weight. In order to solve this problem, an ? time algorithm is proposed. Some extensions of the problem are also shown.

  10. Stoplight Grid: a color-coded visual system for per diem staff assignment.

    Science.gov (United States)

    Ernst, P

    1989-02-01

    What is the best way to appropriately assign per diem nursing personnel? The author describes a systematic approach to per diem staff assignment called the Stoplight Grid. The Stoplight Grid correlates staff skills and preferences with unit needs and integrates this data into a color-coded system for staff assignment.

  11. 30 CFR 285.408 - May I assign my lease or grant interest?

    Science.gov (United States)

    2010-07-01

    ... RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Lease and Grant... application to MMS. The assignment application must include: (1) The MMS-assigned lease or grant number; (2) A... required financial assurance. (c) If you submit an application to assign a lease or grant, you will...

  12. 7 CFR 929.150 - Transfer or assignment of sales history.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 8 2010-01-01 2010-01-01 false Transfer or assignment of sales history. 929.150... MARKETING SERVICE (Marketing Agreements and Orders; Fruits, Vegetables, Nuts), DEPARTMENT OF AGRICULTURE... Transfer or assignment of sales history. (a) If indebtedness is incurred with regard to the acreage to...

  13. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  14. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  15. Assigning Main Orientation to an EOH Descriptor on Multispectral Images.

    Science.gov (United States)

    Li, Yong; Shi, Xiang; Wei, Lijun; Zou, Junwei; Chen, Fang

    2015-07-01

    This paper proposes an approach to compute an EOH (edge-oriented histogram) descriptor with main orientation. EOH has a better matching ability than SIFT (scale-invariant feature transform) on multispectral images, but does not assign a main orientation to keypoints. Alternatively, it tends to assign the same main orientation to every keypoint, e.g., zero degrees. This limits EOH to matching keypoints between images of translation misalignment only. Observing this limitation, we propose assigning to keypoints the main orientation that is computed with PIIFD (partial intensity invariant feature descriptor). In the proposed method, SIFT keypoints are detected from images as the extrema of difference of Gaussians, and every keypoint is assigned to the main orientation computed with PIIFD. Then, EOH is computed for every keypoint with respect to its main orientation. In addition, an implementation variant is proposed for fast computation of the EOH descriptor. Experimental results show that the proposed approach performs more robustly than the original EOH on image pairs that have a rotation misalignment.

  16. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  17. PARAssign-paramagnetic NMR assignments of protein nuclei on the basis of pseudocontact shifts

    Energy Technology Data Exchange (ETDEWEB)

    Skinner, Simon P., E-mail: skinnersp@chem.leidenuniv.nl [Leiden University, Gorlaeus Laboratories, Leiden Institute of Chemistry (Netherlands); Moshev, Mois, E-mail: mois@monomon.me [Leiden University, Leiden Institute of Advanced Computer Science (Netherlands); Hass, Mathias A. S., E-mail: hassmas@chem.leidenuniv.nl; Ubbink, Marcellus, E-mail: m.ubbink@chem.leidenuniv.nl [Leiden University, Gorlaeus Laboratories, Leiden Institute of Chemistry (Netherlands)

    2013-04-15

    The use of paramagnetic NMR data for the refinement of structures of proteins and protein complexes is widespread. However, the power of paramagnetism for protein assignment has not yet been fully exploited. PARAssign is software that uses pseudocontact shift data derived from several paramagnetic centers attached to the protein to obtain amide and methyl assignments. The ability of PARAssign to perform assignment when the positions of the paramagnetic centers are known and unknown is demonstrated. PARAssign has been tested using synthetic data for methyl assignment of a 47 kDa protein, and using both synthetic and experimental data for amide assignment of a 14 kDa protein. The complex fitting space involved in such an assignment procedure necessitates that good starting conditions are found, both regarding placement and strength of paramagnetic centers. These starting conditions are obtained through automated tensor placement and user-defined tensor parameters. The results presented herein demonstrate that PARAssign is able to successfully perform resonance assignment in large systems with a high degree of reliability. This software provides a method for obtaining the assignments of large systems, which may previously have been unassignable, by using 2D NMR spectral data and a known protein structure.

  18. LOW POWER RACE-FREE STATE ASSIGNMENT OF AN ASYNGHRONOUS AUTOMATON

    Directory of Open Access Journals (Sweden)

    Yu. V. Pottosin

    2015-01-01

    Full Text Available The problem of a race free state assignment of an asynchronous automaton is considered. A method for the state assignment is suggested that provides the minimization of the number and theswitching activity of the memory elements along with the elimination of the critical races betweenthem.

  19. Capacity constrained assignment in spatial databases

    DEFF Research Database (Denmark)

    U, Leong Hou; Yiu, Man Lung; Mouratidis, Kyriakos

    2008-01-01

    large to fit in main memory. Motivated by this fact, we propose efficient algorithms for optimal assignment that employ novel edge-pruning strategies, based on the spatial properties of the problem. Additionally, we develop approximate (i.e., suboptimal) CCA solutions that provide a trade-off between...

  20. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  1. A Method Based on Dial's Algorithm for Multi-time Dynamic Traffic Assignment

    Directory of Open Access Journals (Sweden)

    Rongjie Kuang

    2014-03-01

    Full Text Available Due to static traffic assignment has poor performance in reflecting actual case and dynamic traffic assignment may incurs excessive compute cost, method of multi-time dynamic traffic assignment combining static and dynamic traffic assignment balances factors of precision and cost effectively. A method based on Dial's logit algorithm is proposed in the article to solve the dynamic stochastic user equilibrium problem in dynamic traffic assignment. Before that, a fitting function that can proximately reflect overloaded traffic condition of link is proposed and used to give corresponding model. Numerical example is given to illustrate heuristic procedure of method and to compare results with one of same example solved by other literature's algorithm. Results show that method based on Dial's algorithm is preferable to algorithm from others.

  2. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  3. Effectiveness of author-assigned keywords to INIS indexing

    International Nuclear Information System (INIS)

    Yokoo, Hiroshi; Takahashi, Satoko; Habara, Tadashi

    1977-01-01

    A test was carried out on the quality of indexing data which is based only upon author-assigned keywords in order to appreciate effectiveness of the keywords. As measures of the quality, the retrievability and the consistency of the indexing data were evaluated by comparison with the case of the conventional indexing method under the circumstances of the INIS descriptor assignment to the journal articles of the Atomic Energy Society of Japan. The indexing consistency obtained was approximately 0.61 on an average (or 0.66 when the narrower-broader hierarchical relations were regarded as consistent ones). Of the hit, noise, or total documents retrieved with the conventional indexing data, 0.86, 0.27, or 0.71, respectively, were retrievable with the keywords-based indexing data. From the results the recall ratio for the keywords-based indexing is estimated to be no less than 0.86 of that for the conventional indexing method, and the consistency of the hit documents are to be 0.75 at least. Consequently, the author-assigned keywords proved to be very effective to the document indexing. (auth.)

  4. Automated sequence-specific protein NMR assignment using the memetic algorithm MATCH

    International Nuclear Information System (INIS)

    Volk, Jochen; Herrmann, Torsten; Wuethrich, Kurt

    2008-01-01

    MATCH (Memetic Algorithm and Combinatorial Optimization Heuristics) is a new memetic algorithm for automated sequence-specific polypeptide backbone NMR assignment of proteins. MATCH employs local optimization for tracing partial sequence-specific assignments within a global, population-based search environment, where the simultaneous application of local and global optimization heuristics guarantees high efficiency and robustness. MATCH thus makes combined use of the two predominant concepts in use for automated NMR assignment of proteins. Dynamic transition and inherent mutation are new techniques that enable automatic adaptation to variable quality of the experimental input data. The concept of dynamic transition is incorporated in all major building blocks of the algorithm, where it enables switching between local and global optimization heuristics at any time during the assignment process. Inherent mutation restricts the intrinsically required randomness of the evolutionary algorithm to those regions of the conformation space that are compatible with the experimental input data. Using intact and artificially deteriorated APSY-NMR input data of proteins, MATCH performed sequence-specific resonance assignment with high efficiency and robustness

  5. A code reviewer assignment model incorporating the competence differences and participant preferences

    Directory of Open Access Journals (Sweden)

    Wang Yanqing

    2016-03-01

    Full Text Available A good assignment of code reviewers can effectively utilize the intellectual resources, assure code quality and improve programmers’ skills in software development. However, little research on reviewer assignment of code review has been found. In this study, a code reviewer assignment model is created based on participants’ preference to reviewing assignment. With a constraint of the smallest size of a review group, the model is optimized to maximize review outcomes and avoid the negative impact of “mutual admiration society”. This study shows that the reviewer assignment strategies incorporating either the reviewers’ preferences or the authors’ preferences get much improvement than a random assignment. The strategy incorporating authors’ preference makes higher improvement than that incorporating reviewers’ preference. However, when the reviewers’ and authors’ preference matrixes are merged, the improvement becomes moderate. The study indicates that the majority of the participants have a strong wish to work with reviewers and authors having highest competence. If we want to satisfy the preference of both reviewers and authors at the same time, the overall improvement of learning outcomes may be not the best.

  6. Automatic Assignment of Methyl-NMR Spectra of Supramolecular Machines Using Graph Theory.

    Science.gov (United States)

    Pritišanac, Iva; Degiacomi, Matteo T; Alderson, T Reid; Carneiro, Marta G; Ab, Eiso; Siegal, Gregg; Baldwin, Andrew J

    2017-07-19

    Methyl groups are powerful probes for the analysis of structure, dynamics and function of supramolecular assemblies, using both solution- and solid-state NMR. Widespread application of the methodology has been limited due to the challenges associated with assigning spectral resonances to specific locations within a biomolecule. Here, we present Methyl Assignment by Graph Matching (MAGMA), for the automatic assignment of methyl resonances. A graph matching protocol examines all possibilities for each resonance in order to determine an exact assignment that includes a complete description of any ambiguity. MAGMA gives 100% accuracy in confident assignments when tested against both synthetic data, and 9 cross-validated examples using both solution- and solid-state NMR data. We show that this remarkable accuracy enables a user to distinguish between alternative protein structures. In a drug discovery application on HSP90, we show the method can rapidly and efficiently distinguish between possible ligand binding modes. By providing an exact and robust solution to methyl resonance assignment, MAGMA can facilitate significantly accelerated studies of supramolecular machines using methyl-based NMR spectroscopy.

  7. Organic Chemistry YouTube Writing Assignment for Large Lecture Classes

    Science.gov (United States)

    Franz, Annaliese K.

    2012-01-01

    This work describes efforts to incorporate and evaluate the use of a YouTube writing assignment in large lecture classes to personalize learning and improve conceptual understanding of chemistry through peer- and self-explanation strategies. Although writing assignments can be a method to incorporate peer- and self-explanation strategies, this…

  8. Negotiating Languages and Cultures: Enacting Translingualism through a Translation Assignment

    Science.gov (United States)

    Kiernan, Julia; Meier, Joyce; Wang, Xiqiao

    2016-01-01

    This collaborative project explores the affordances of a translation assignment in the context of a learner-centered pedagogy that places composition students' movement among languages and cultures as both a site for inquiry and subject of analysis. The translation assignment asks students to translate scholarly articles or culture stories from…

  9. Students' Evaluation of Writing Assignments in an Abnormal Psychology Course.

    Science.gov (United States)

    Procidano, Mary E.

    1991-01-01

    Presents a study in which students in an abnormal psychology class rated the usefulness of drafts for two writing assignments. Reports that a research proposal was more effective than a case study in generating interest in psychology and opportunity for creativity. Concludes that writing assignments should reflect important aspects of a…

  10. Bacteria as bullies: effects of linguistic agency assignment in health message.

    Science.gov (United States)

    Bell, Robert A; McGlone, Matthew S; Dragojevic, Marko

    2014-01-01

    When describing health threats, communicators can assign agency to the threat (e.g., "Hepatitis C has infected 4 million Americans") or to humans (e.g., "Four million Americans have contracted hepatitis C"). In an online experiment, the authors explored how assignment of agency affects perceptions of susceptibility and severity of a health threat, response efficacy, self-efficacy, fear arousal, and intentions to adopt health-protective recommendations. Participants were 719 individuals recruited through Mechanical Turk ( www.mturk.com ), a crowdsource labor market run by Amazon ( www.amazon.com ). The participants were assigned randomly to read 1 of 8 flyers defined by a 2×4 (Agency Assignment×Topic) factorial design. Each flyer examined 1 health threat (E. coli, necrotizing fasciitis, salmonella, or Carbapenem-resistant Klebsiella pneumoniae) and was written in language that emphasized bacterial or human agency. Perceived susceptibility and severity were highest when bacterial agency language was used. Response efficacy, self-efficacy, and fear arousal were not significantly affected by agency assignment. Participants reported stronger intentions to adopt recommendations when bacteria agency language was used, but this effect did not reach conventional standards of significance (p < .051). The authors concluded that health communicators can increase target audiences' perceptions of susceptibility and severity by assigning agency to the threat in question when devising health messages.

  11. Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.

    Energy Technology Data Exchange (ETDEWEB)

    Merker, Christopher

    1993-04-01

    This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

  12. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  13. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  14. A Stone Resource Assignment Model under the Fuzzy Environment

    Directory of Open Access Journals (Sweden)

    Liming Yao

    2012-01-01

    to tackle a stone resource assignment problem with the aim of decreasing dust and waste water emissions. On the upper level, the local government wants to assign a reasonable exploitation amount to each stone plant so as to minimize total emissions and maximize employment and economic profit. On the lower level, stone plants must reasonably assign stone resources to produce different stone products under the exploitation constraint. To deal with inherent uncertainties, the object functions and constraints are defuzzified using a possibility measure. A fuzzy simulation-based improved simulated annealing algorithm (FS-ISA is designed to search for the Pareto optimal solutions. Finally, a case study is presented to demonstrate the practicality and efficiency of the model. Results and a comparison analysis are presented to highlight the performance of the optimization method, which proves to be very efficient compared with other algorithms.

  15. Wildlife forensic science: A review of genetic geographic origin assignment.

    Science.gov (United States)

    Ogden, Rob; Linacre, Adrian

    2015-09-01

    Wildlife forensic science has become a key means of enforcing legislation surrounding the illegal trade in protected and endangered species. A relatively new dimension to this area of forensic science is to determine the geographic origin of a seized sample. This review focuses on DNA testing, which relies on assignment of an unknown sample to its genetic population of origin. Key examples of this are the trade in timber, fish and ivory and these are used only to illustrate the large number of species for which this type of testing is potentially available. The role of mitochondrial and nuclear DNA markers is discussed, alongside a comparison of neutral markers with those exhibiting signatures of selection, which potentially offer much higher levels of assignment power to address specific questions. A review of assignment tests is presented along with detailed methods for evaluating error rates and considerations for marker selection. The availability and quality of reference data are of paramount importance to support assignment applications and ensure reliability of any conclusions drawn. The genetic methods discussed have been developed initially as investigative tools but comment is made regarding their use in courts. The potential to compliment DNA markers with elemental assays for greater assignment power is considered and finally recommendations are made for the future of this type of testing. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  16. Reflective practice: assessment of assignments in English for Specific Purposes

    Directory of Open Access Journals (Sweden)

    Galina Kavaliauskiené

    2007-10-01

    Full Text Available The construct alternative assessment has been widely used in higher education. It is often defined as any type of assessment of learners who provide a response to an assignment. The key features of alternative assessment are active participation of learners in self-evaluation of their performance, and the development of reflective thinking through reflective thinking (Schön, 1983. The success of alternative assessment in language teaching is predetermined by student’s performance and demonstrates learner’s language proficiency in contemporary communicative classrooms. This paper aims at researching the influence of students’ evaluations of various assignments for their linguistic development in English for Specific Purposes (ESP. The study uses learners’ assessment of different assignments and learners’ in-course and post-course written reflections on benefits to language mastery. Learners’ assignments included were contributions to portfolios (dossiers, such as essays and summaries, oral presentations, short impromptu talks, creative tasks, tests, and self-assessment notes (reflections on activities in learning ESP. Findings were obtained for two streams of the project participants. Results showed that self-assessment was beneficial for learners’ linguistic development. The context of learners’ reflections reveals that the attitudes to various assignments are affected by success or failure in students’ performance. Reflective practice might help teachers develop ways of dealing with previously identified difficulties and improve the quality of teaching.

  17. 40 CFR 1054.626 - What special provisions apply to equipment imported under the Transition Program for Equipment...

    Science.gov (United States)

    2010-07-01

    ... EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT Special Compliance Provisions § 1054... provisions of this section and send us an annual report, as follows: (1) Notify the Designated Compliance... and manufacturing equipment. Companies that import equipment into the United States without meeting...

  18. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  19. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  20. Teaching Complaint and Adjustment Letters--And Tact (My Favorite Assignment).

    Science.gov (United States)

    Deimling, Paula

    1992-01-01

    Describes a three-part assignment in which each student writes a complaint letter and an adjustment letter responding to another student's complaint letter. Discusses how the third part of the assignment--journal entries--allows students to formulate their own criteria for excellent letters based upon their reactions to the letters they receive.…

  1. On the Use of Writing Assignments in Intermediate Microeconomic Theory

    Science.gov (United States)

    O'Neill, Patrick B.

    2009-01-01

    A typical writing assignment in upper level required courses is a term paper. However many economics majors, particularly those in business schools, need to develop skill at writing shorter pieces. In this paper I describe numerous examples of shorter writing assignments that I have incorporated into an Intermediate Microeconomic Theory course.…

  2. Probabilistic validation of protein NMR chemical shift assignments

    International Nuclear Information System (INIS)

    Dashti, Hesam; Tonelli, Marco; Lee, Woonghee; Westler, William M.; Cornilescu, Gabriel; Ulrich, Eldon L.; Markley, John L.

    2016-01-01

    Data validation plays an important role in ensuring the reliability and reproducibility of studies. NMR investigations of the functional properties, dynamics, chemical kinetics, and structures of proteins depend critically on the correctness of chemical shift assignments. We present a novel probabilistic method named ARECA for validating chemical shift assignments that relies on the nuclear Overhauser effect data. ARECA has been evaluated through its application to 26 case studies and has been shown to be complementary to, and usually more reliable than, approaches based on chemical shift databases. ARECA is available online at http://areca.nmrfam.wisc.edu/ http://areca.nmrfam.wisc.edu/

  3. Probabilistic validation of protein NMR chemical shift assignments

    Energy Technology Data Exchange (ETDEWEB)

    Dashti, Hesam [University of Wisconsin-Madison, Graduate Program in Biophysics, Biochemistry Department (United States); Tonelli, Marco; Lee, Woonghee; Westler, William M.; Cornilescu, Gabriel [University of Wisconsin-Madison, Biochemistry Department, National Magnetic Resonance Facility at Madison (United States); Ulrich, Eldon L. [University of Wisconsin-Madison, BioMagResBank, Biochemistry Department (United States); Markley, John L., E-mail: markley@nmrfam.wisc.edu, E-mail: jmarkley@wisc.edu [University of Wisconsin-Madison, Biochemistry Department, National Magnetic Resonance Facility at Madison (United States)

    2016-01-15

    Data validation plays an important role in ensuring the reliability and reproducibility of studies. NMR investigations of the functional properties, dynamics, chemical kinetics, and structures of proteins depend critically on the correctness of chemical shift assignments. We present a novel probabilistic method named ARECA for validating chemical shift assignments that relies on the nuclear Overhauser effect data. ARECA has been evaluated through its application to 26 case studies and has been shown to be complementary to, and usually more reliable than, approaches based on chemical shift databases. ARECA is available online at http://areca.nmrfam.wisc.edu/ http://areca.nmrfam.wisc.edu/.

  4. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  5. 46 CFR 117.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft equipment. 117.175 Section 117.175... AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 117.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it...

  6. Optimal Processor Assignment for Pipeline Computations

    Science.gov (United States)

    1991-10-01

    the use of ratios: initially each task is assigned a procesbuor2 the remaining proceborb are distributed in proportion to the quantities f,(1), 1 < i...algorithmns. IEEE Trans. onl Parallel and Distributed Systemns, 1 (4):470-499, October 1990. [26] P. Al. Kogge. The Architeture of Pipelined Comnputers

  7. 41 CFR 102-79.20 - What standard must Executive agencies promote when assigning space?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What standard must Executive agencies promote when assigning space? 102-79.20 Section 102-79.20 Public Contracts and Property... PROPERTY 79-ASSIGNMENT AND UTILIZATION OF SPACE Assignment and Utilization of Space Assignment of Space...

  8. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  9. Assigning Main Orientation to an EOH Descriptor on Multispectral Images

    Directory of Open Access Journals (Sweden)

    Yong Li

    2015-07-01

    Full Text Available This paper proposes an approach to compute an EOH (edge-oriented histogram descriptor with main orientation. EOH has a better matching ability than SIFT (scale-invariant feature transform on multispectral images, but does not assign a main orientation to keypoints. Alternatively, it tends to assign the same main orientation to every keypoint, e.g., zero degrees. This limits EOH to matching keypoints between images of translation misalignment only. Observing this limitation, we propose assigning to keypoints the main orientation that is computed with PIIFD (partial intensity invariant feature descriptor. In the proposed method, SIFT keypoints are detected from images as the extrema of difference of Gaussians, and every keypoint is assigned to the main orientation computed with PIIFD. Then, EOH is computed for every keypoint with respect to its main orientation. In addition, an implementation variant is proposed for fast computation of the EOH descriptor. Experimental results show that the proposed approach performs more robustly than the original EOH on image pairs that have a rotation misalignment.

  10. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  11. 46 CFR 42.05-10 - Assigning authority.

    Science.gov (United States)

    2010-10-01

    ... Definition of Terms Used in This Subchapter § 42.05-10 Assigning authority. This term means the “American Bureau of Shipping” or such other recognized classification society which the Commandant may approve as...

  12. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  13. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  14. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  15. Automation of block assignment planning using a diagram-based scenario modeling method

    Directory of Open Access Journals (Sweden)

    In Hyuck Hwang

    2014-03-01

    Full Text Available Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is because the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manually by experienced workers. In this study, a method of representing the block assignment rules using a diagram was suggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

  16. Automation of block assignment planning using a diagram-based scenario modeling method

    Directory of Open Access Journals (Sweden)

    Hwang In Hyuck

    2014-03-01

    Full Text Available Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is be¬cause the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manu¬ally by experienced workers. In this study, a method of representing the block assignment rules using a diagram was su¬ggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.

  17. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  18. An Accurate and Impartial Expert Assignment Method for Scientific Project Review

    Directory of Open Access Journals (Sweden)

    Mingliang Yue

    2017-12-01

    Full Text Available Purpose: This paper proposes an expert assignment method for scientific project review that considers both accuracy and impartiality. As impartial and accurate peer review is extremely important to ensure the quality and feasibility of scientific projects, enhanced methods for managing the process are needed. Design/methodology/approach: To ensure both accuracy and impartiality, we design four criteria, the reviewers’ fitness degree, research intensity, academic association, and potential conflict of interest, to express the characteristics of an appropriate peer review expert. We first formalize the expert assignment problem as an optimization problem based on the designed criteria, and then propose a randomized algorithm to solve the expert assignment problem of identifying reviewer adequacy. Findings: Simulation results show that the proposed method is quite accurate and impartial during expert assignment. Research limitations: Although the criteria used in this paper can properly show the characteristics of a good and appropriate peer review expert, more criteria/conditions can be included in the proposed scheme to further enhance accuracy and impartiality of the expert assignment. Practical implications: The proposed method can help project funding agencies (e.g. the National Natural Science Foundation of China find better experts for project peer review. Originality/value: To the authors’ knowledge, this is the first publication that proposes an algorithm that applies an impartial approach to the project review expert assignment process. The simulation results show the effectiveness of the proposed method.

  19. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  20. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  1. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  2. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  3. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  4. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  5. A Web Support System for Submission and Handling of Programming Assignments

    DEFF Research Database (Denmark)

    Nørmark, Kurt

    2011-01-01

    Individual submission of programming assignments should be considered in all introductory programming courses. We describe a custom web support system for submission and management of programming assignments in an introductory C programming course. Experience from the first time use of the system...... is reported. In addition, we compare the pattern of use with the results of the final exam in order to reveal a possible impact of the programming assignments. We summarize the lessons learned in preparation for improving the system prior to the next round of use in the fall of 2011....

  6. Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

    2005-11-01

    initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope

  7. Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

    2006-02-01

    initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope

  8. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  9. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  10. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  11. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  12. Assigned experts with competitive goals withhold information in group decision making

    NARCIS (Netherlands)

    Toma, C.; Vasiljevic, D.; Oberlé, D.; Butera, F.

    2013-01-01

    Expertise assignment has been proposed to improve unshared information pooling in group decision making. The current research revises this view by hypothesizing that expertise assignment is beneficial when group members have cooperative goals, but is detrimental when group members have competitive

  13. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  14. Microbial Contamination Level Profiles Attributed to Contamination of Beef Carcasses, Personnel, and Equipment: Case of Small and Medium Enterprise Slaughterhouses.

    Science.gov (United States)

    Wambui, Joseph; Lamuka, Peter; Karuri, Edward; Matofari, Joseph; Njage, Patrick Murigu Kamau

    2018-04-01

    The microbial contamination level profiles (MCLPs) attributed to contamination of beef carcasses, personnel, and equipment in five Kenyan small and medium enterprise slaughterhouses were determined. Aerobic plate counts, Enterobacteriaceae, Staphylococcus, and Salmonella were used to determine contamination at four different slaughter stages, namely, dehiding, evisceration, splitting, and dispatch. Microbiological criteria of the four microorganisms were used to score contamination levels (CLs) as poor (0), poor to average (1), average (2), or good (3). MCLPs were further assigned to carcasses, personnel, and equipment at each stage by summing up the CL scores. The CL score attributed to aerobic plate count contamination was 2 or 3 for carcasses but 0 for personnel and equipment in almost all slaughterhouses. A score of 0 on carcasses was mostly attributed to Enterobacteriaceae at evisceration and to Salmonella at dehiding and evisceration. In addition, a score of 0 was mostly attributed to Staphylococcus contamination of personnel at dehiding. A score of 3 was attributed mostly to Enterobacteriaceae on hands at splitting, whereas a score of 2 was mostly attributed to the clothes at dehiding and evisceration. A CL score of 3 was mostly attributed to Enterobacteriaceae and Salmonella contamination of equipment at dehiding and splitting, respectively. Although CLs attributed to contamination of carcasses, personnel, and equipment ranged from 0 to 3, the maximum MCLP score of 9 was only attained in carcasses from two slaughterhouses at dehiding and from one slaughterhouse at dispatch. There is, therefore, a lot of room for small and medium enterprise slaughterhouses to improve their food safety objectives by improving food safety management systems at the points characterized by low CL scores.

  15. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  16. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  17. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  18. Assignment methodology for larger RNA oligonucleotides: Application to an ATP-binding RNA aptamer

    International Nuclear Information System (INIS)

    Dieckmann, Thorsten; Feigon, Juli

    1997-01-01

    The use of uniform 13C, 15N labeling in the NMR spectroscopic study of RNA structures has greatly facilitated the assignment process in small RNA oligonucleotides. For ribose spinsystem assignments, exploitation of these labels has followed previously developed methods for the study of proteins. However, for sequential assignment of the exchangeable and nonexchangeable protons of the nucleotides, it has been necessary to develop a variety of new NMR experiments. Even these are of limited utility in the unambiguous assignment of larger RNAs due to the short carbon relaxation times and extensive spectral overlap for all nuclei.These problems can largely be overcome by the additional use of base-type selectively 13C, 15N-labeled RNA in combination with a judicious use of related RNAs with base substitutions. We report the application of this approach to a 36-nucleotide ATP-binding RNA aptamer in complex with AMP. Complete sequential 1H assignments, as well as the majority of 13C and 15N assignments, were obtained

  19. AUTOBA: automation of backbone assignment from HN(C)N suite of experiments.

    Science.gov (United States)

    Borkar, Aditi; Kumar, Dinesh; Hosur, Ramakrishna V

    2011-07-01

    Development of efficient strategies and automation represent important milestones of progress in rapid structure determination efforts in proteomics research. In this context, we present here an efficient algorithm named as AUTOBA (Automatic Backbone Assignment) designed to automate the assignment protocol based on HN(C)N suite of experiments. Depending upon the spectral dispersion, the user can record 2D or 3D versions of the experiments for assignment. The algorithm uses as inputs: (i) protein primary sequence and (ii) peak-lists from user defined HN(C)N suite of experiments. In the end, one gets H(N), (15)N, C(α) and C' assignments (in common BMRB format) for the individual residues along the polypeptide chain. The success of the algorithm has been demonstrated, not only with experimental spectra recorded on two small globular proteins: ubiquitin (76 aa) and M-crystallin (85 aa), but also with simulated spectra of 27 other proteins using assignment data from the BMRB.

  20. Epidemiological tracking and population assignment of the non-clonal bacterium, Burkholderia pseudomallei.

    Science.gov (United States)

    Dale, Julia; Price, Erin P; Hornstra, Heidie; Busch, Joseph D; Mayo, Mark; Godoy, Daniel; Wuthiekanun, Vanaporn; Baker, Anthony; Foster, Jeffrey T; Wagner, David M; Tuanyok, Apichai; Warner, Jeffrey; Spratt, Brian G; Peacock, Sharon J; Currie, Bart J; Keim, Paul; Pearson, Talima

    2011-12-01

    Rapid assignment of bacterial pathogens into predefined populations is an important first step for epidemiological tracking. For clonal species, a single allele can theoretically define a population. For non-clonal species such as Burkholderia pseudomallei, however, shared allelic states between distantly related isolates make it more difficult to identify population defining characteristics. Two distinct B. pseudomallei populations have been previously identified using multilocus sequence typing (MLST). These populations correlate with the major foci of endemicity (Australia and Southeast Asia). Here, we use multiple Bayesian approaches to evaluate the compositional robustness of these populations, and provide assignment results for MLST sequence types (STs). Our goal was to provide a reference for assigning STs to an established population without the need for further computational analyses. We also provide allele frequency results for each population to enable estimation of population assignment even when novel STs are discovered. The ability for humans and potentially contaminated goods to move rapidly across the globe complicates the task of identifying the source of an infection or outbreak. Population genetic dynamics of B. pseudomallei are particularly complicated relative to other bacterial pathogens, but the work here provides the ability for broad scale population assignment. As there is currently no independent empirical measure of successful population assignment, we provide comprehensive analytical details of our comparisons to enable the reader to evaluate the robustness of population designations and assignments as they pertain to individual research questions. Finer scale subdivision and verification of current population compositions will likely be possible with genotyping data that more comprehensively samples the genome. The approach used here may be valuable for other non-clonal pathogens that lack simple group-defining genetic characteristics

  1. Epidemiological tracking and population assignment of the non-clonal bacterium, Burkholderia pseudomallei.

    Directory of Open Access Journals (Sweden)

    Julia Dale

    2011-12-01

    Full Text Available Rapid assignment of bacterial pathogens into predefined populations is an important first step for epidemiological tracking. For clonal species, a single allele can theoretically define a population. For non-clonal species such as Burkholderia pseudomallei, however, shared allelic states between distantly related isolates make it more difficult to identify population defining characteristics. Two distinct B. pseudomallei populations have been previously identified using multilocus sequence typing (MLST. These populations correlate with the major foci of endemicity (Australia and Southeast Asia. Here, we use multiple Bayesian approaches to evaluate the compositional robustness of these populations, and provide assignment results for MLST sequence types (STs. Our goal was to provide a reference for assigning STs to an established population without the need for further computational analyses. We also provide allele frequency results for each population to enable estimation of population assignment even when novel STs are discovered. The ability for humans and potentially contaminated goods to move rapidly across the globe complicates the task of identifying the source of an infection or outbreak. Population genetic dynamics of B. pseudomallei are particularly complicated relative to other bacterial pathogens, but the work here provides the ability for broad scale population assignment. As there is currently no independent empirical measure of successful population assignment, we provide comprehensive analytical details of our comparisons to enable the reader to evaluate the robustness of population designations and assignments as they pertain to individual research questions. Finer scale subdivision and verification of current population compositions will likely be possible with genotyping data that more comprehensively samples the genome. The approach used here may be valuable for other non-clonal pathogens that lack simple group-defining genetic

  2. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  3. Practical aspects of NMR signal assignment in larger and challenging proteins

    Science.gov (United States)

    Frueh, Dominique P.

    2014-01-01

    NMR has matured into a technique routinely employed for studying proteins in near physiological conditions. However, applications to larger proteins are impeded by the complexity of the various correlation maps necessary to assign NMR signals. This article reviews the data analysis techniques traditionally employed for resonance assignment and describes alternative protocols necessary for overcoming challenges in large protein spectra. In particular, simultaneous analysis of multiple spectra may help overcome ambiguities or may reveal correlations in an indirect manner. Similarly, visualization of orthogonal planes in a multidimensional spectrum can provide alternative assignment procedures. We describe examples of such strategies for assignment of backbone, methyl, and nOe resonances. We describe experimental aspects of data acquisition for the related experiments and provide guidelines for preliminary studies. Focus is placed on large folded monomeric proteins and examples are provided for 37, 48, 53, and 81 kDa proteins. PMID:24534088

  4. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  5. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  6. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  7. 46 CFR 77.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding equipment. 77.40-1 Section 77.40-1... MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 77.40-1 Pilot boarding equipment. (a) This... vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on each side of the...

  8. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  9. Applications of random forest feature selection for fine-scale genetic population assignment.

    Science.gov (United States)

    Sylvester, Emma V A; Bentzen, Paul; Bradbury, Ian R; Clément, Marie; Pearce, Jon; Horne, John; Beiko, Robert G

    2018-02-01

    Genetic population assignment used to inform wildlife management and conservation efforts requires panels of highly informative genetic markers and sensitive assignment tests. We explored the utility of machine-learning algorithms (random forest, regularized random forest and guided regularized random forest) compared with F ST ranking for selection of single nucleotide polymorphisms (SNP) for fine-scale population assignment. We applied these methods to an unpublished SNP data set for Atlantic salmon ( Salmo salar ) and a published SNP data set for Alaskan Chinook salmon ( Oncorhynchus tshawytscha ). In each species, we identified the minimum panel size required to obtain a self-assignment accuracy of at least 90% using each method to create panels of 50-700 markers Panels of SNPs identified using random forest-based methods performed up to 7.8 and 11.2 percentage points better than F ST -selected panels of similar size for the Atlantic salmon and Chinook salmon data, respectively. Self-assignment accuracy ≥90% was obtained with panels of 670 and 384 SNPs for each data set, respectively, a level of accuracy never reached for these species using F ST -selected panels. Our results demonstrate a role for machine-learning approaches in marker selection across large genomic data sets to improve assignment for management and conservation of exploited populations.

  10. 10 CFR Appendix A to Part 20 - Assigned Protection Factors for Respirators a

    Science.gov (United States)

    2010-01-01

    ... internal dose due to inhalation may, in addition, present external exposure hazards at higher... 10 Energy 1 2010-01-01 2010-01-01 false Assigned Protection Factors for Respirators a A Appendix A..., App. A Appendix A to Part 20—Assigned Protection Factors for Respirators a Operating mode Assigned...

  11. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  12. Optimisation of timetable-based, stochastic transit assignment models based on MSA

    DEFF Research Database (Denmark)

    Nielsen, Otto Anker; Frederiksen, Rasmus Dyhr

    2006-01-01

    (CRM), such a large-scale transit assignment model was developed and estimated. The Stochastic User Equilibrium problem was solved by the Method of Successive Averages (MSA). However, the model suffered from very large calculation times. The paper focuses on how to optimise transit assignment models...

  13. 48 CFR 832.805-70 - Distribution/notification of assignment of claims.

    Science.gov (United States)

    2010-10-01

    ... assignment of payments for contracts under which payment for articles and services is certified and approved... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Distribution/notification... DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Assignment of Claims 832...

  14. Danish Public Construction Counselling Selection and Assignment Criteria in European Tendering

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2014-01-01

    One of the largest customers in the Danish construction industry is public agencies that own and develop projects. For some of the counselling services, they recur to be put out in European tendering. The aim is to find which selection and assignment criteria are used most in public tendering. How...... projects use selection and assignment criteria for counselling services and finally if there is significant use of selection and assignment methods in public counselling. The method is based on 74 public counselling tenders from the European Tenders Electronic Daily database from January 2010 to March 2013...

  15. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  16. Weight/balance portable test equipment

    International Nuclear Information System (INIS)

    Whitlock, R.W.

    1994-01-01

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches

  17. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  18. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  19. Controversies of Sex Re-assignment in Genetic Males with Congenital Inadequacy of the Penis.

    Science.gov (United States)

    Raveenthiran, Venkatachalam

    2017-09-01

    Sex assignment in 46XY genetic male children with congenital inadequacy of the penis (CIP) is controversial. Traditionally, children with penile length less than 2 cm at birth are considered unsuitable to be raised as males. They are typically re-assigned to female-sex and feminizing genitoplasty is usually done in infancy. However, the concept of cerebral androgen imprinting has caused paradigm shift in the philosophy of sex re-assignment. Masculinization of the brain, rather than length of the penis, is the modern criterion of sex re-assignment in CIP. This review summarizes the current understanding of the complex issue. In 46XY children with CIP, male-sex assignment appears appropriate in non-hormonal conditions such as idiopathic micropenis, aphallia and exstrophy. Female-sex re-assignment appears acceptable in complete androgen insensitivity (CAIS), while partial androgen insensitivity syndrome (PAIS) patients are highly dissatisfied with the assignment of either sex. Children with 5-alpha reductase deficiency are likely to have spontaneous penile lengthening at puberty. Hence, they are better raised as males. Although female assignment is common in pure gonadal dysgenesis, long-term results are not known to justify the decision.

  20. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  1. Automatic dose-rate controlling equipment

    International Nuclear Information System (INIS)

    Szasz, T.; Nagy Czirok, Cs.; Batki, L.; Antal, S.

    1977-01-01

    The patent of a dose-rate controlling equipment that can be attached to X-ray image-amplifiers is presented. In the new equipment the current of the photocatode of the image-amplifier is led into the regulating unit, which controls the X-ray generator automatically. The advantages of the equipment are the following: it can be simply attached to any type of X-ray image-amplifier, it accomplishes fast and sensitive regulation, it makes possible the control of both the mA and the kV values, it is attached to the most reliable point of the image-transmission chain. (L.E.)

  2. Work assignments, delegation of tasks and job satisfaction among Danish dental hygienists.

    Science.gov (United States)

    Hach, M; Aaberg, K B; Lempert, S M; Danielsen, B

    2017-08-01

    Recent legislation in Denmark has made it possible for dentists to delegate their tasks to dental hygienists. Previous studies have shown that Danish dental hygienists primarily were performing assignments within their own work field. These assignments include prophylaxis or instructing patients in oral health care. However, studies have also shown that Danish dental hygienists performed dental nurse assignments such as chair-side assistance, unit cleaning and disinfection of instruments. The objectives of this study were to investigate (i) the range of work assignments performed by Danish dental hygienists, (ii) the types of dentist tasks performed by Danish dental hygienists and (iii) job satisfaction among Danish dental hygienists. Dental hygienists graduating in 2004-2007 were invited to participate in this study. Participants answered an email-distributed questionnaire. The questionnaire consisted of questions regarding job satisfaction, assignments performed, postgraduate course attendance, receiving assistance from a dental nurse and which work assignments Danish dental hygienists wish to perform in the future. The results of this study showed that 90% of Danish dental hygienists were satisfied with their job and 52% were performing dentists' tasks. Among dentists' tasks performed by Danish dental hygienists, invasive caries therapy was the most frequently performed task. The type of assignments performed by Danish dental hygienists today appears to be changing compared to previous studies. From initially performing prophylaxis and chair-side assistance for the dentist, Danish dental hygienists today are performing a wider range of tasks which includes dentists' tasks. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  3. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  4. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

    2004-05-27

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small

  5. Model morphing and sequence assignment after molecular replacement.

    Science.gov (United States)

    Terwilliger, Thomas C; Read, Randy J; Adams, Paul D; Brunger, Axel T; Afonine, Pavel V; Hung, Li-Wei

    2013-11-01

    A procedure termed `morphing' for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Å and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package.

  6. Disentangling Mathematics Target and Access Skills: Implications for Accommodation Assignment Practices

    Science.gov (United States)

    Ketterlin-Geller, Leanne R.; Jamgochian, Elisa M.; Nelson-Walker, Nancy J.; Geller, Joshua P.

    2012-01-01

    Appropriate assignment of accommodations is predicated on a clear distinction between target skills and access skills. In this study, we examine the agreement between test developer/researchers' and educators' classification of target and access skills as a possible explanatory mechanism for assigning accommodations. Findings indicate that…

  7. Written Assignments for Abnormal Psychology at Howard Community College, Fall 1988.

    Science.gov (United States)

    Bell, James

    Designed for students enrolled in an Abnormal Psychology course at Howard Community College (Maryland), this booklet explains the requirements for the course's writing assignments, which are designed to teach the skills of comparison and contrast, analysis, critical thinking, and synthesis. Following an overview of class assignments and…

  8. Improving Students’ Learning in Software Engineering Education through Multi-Level Assignments

    NARCIS (Netherlands)

    Dr. Leo Pruijt; Christian Köppe

    2014-01-01

    Author supplied: DOI : http://dx.doi.org/10.1145/2691352.2691357 Assignments and exercises are an essential part of software engineering education. It usually requires a variety of these assignments to cover a desired wide range of educational objectives as defined in the revised Bloom's taxonomy.

  9. The edge complex: implicit memory for figure assignment in shape perception.

    Science.gov (United States)

    Peterson, Mary A; Enns, James T

    2005-05-01

    Viewing a stepped edge is likely to prompt the perceptual assignment of one side of the edge as figure. This study demonstrates that even a single brief glance at a novel edge gives rise to an implicit memory regarding which side was seen as figure; this edge complex enters into the figure assignment process the next time the edge is encountered, both speeding same-different judgments when the figural side is repeated and slowing these judgments when the new figural side is identical to the former ground side (Experiments 1A and 1B). These results were obtained even when the facing direction of the repeated edge was mirror reversed (Experiment 2). This study shows that implicit measures can reveal the effects of past experience on figure assignment, following a single prior exposure to a novel shape, and supports a competitive model of figure assignment in which past experience serves as one of many figural cues.

  10. A Statistical Programme Assignment Model

    DEFF Research Database (Denmark)

    Rosholm, Michael; Staghøj, Jonas; Svarer, Michael

    When treatment effects of active labour market programmes are heterogeneous in an observable way  across the population, the allocation of the unemployed into different programmes becomes a particularly  important issue. In this paper, we present a statistical model designed to improve the present...... duration of unemployment spells may result if a statistical programme assignment model is introduced. We discuss several issues regarding the  plementation of such a system, especially the interplay between the statistical model and  case workers....

  11. Origins of eponymous orthopaedic equipment.

    Science.gov (United States)

    Meals, Clifton; Wang, Jeffrey

    2010-06-01

    Orthopaedists make great use of eponymous equipment, however the origins of these tools are unknown to many users. This history enriches, enlightens, and enhances surgical education, and may inspire modern innovation. We explored the origins of common and eponymous orthopaedic equipment. We selected pieces of equipment named for their inventors and in the broadest use by modern orthopaedists. We do not describe specialized orthopaedic implants and instruments owing to the overwhelming number of these devices. The history of this equipment reflects the coevolution of orthopaedics and battlefield medicine. Additionally, these stories evidence the primacy of elegant design and suggest that innovation is often a process of revision and refinement rather than sudden inspiration. Their history exposes surgical innovators as brilliant, lucky, hardworking, and sometimes odd. These stories amuse, enlighten, and may inspire modern orthopaedists to develop creative solutions of their own. The rich history of the field's eponymous instruments informs an ongoing tradition of innovation in orthopaedics.

  12. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  13. Integrated project scheduling and staff assignment with controllable processing times.

    Science.gov (United States)

    Fernandez-Viagas, Victor; Framinan, Jose M

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  14. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    Directory of Open Access Journals (Sweden)

    Victor Fernandez-Viagas

    2014-01-01

    Full Text Available This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, together with some extensions to cope with different situations. Additionally, the advantages of the controllable processing times approach are compared with the fixed processing times. Due to the complexity of the integrated model, a simple GRASP algorithm is implemented in order to obtain good, approximate solutions in short computation times.

  15. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  16. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  17. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  18. The Automatic Sweetheart: An Assignment in a History of Psychology Course

    Science.gov (United States)

    Sibicky, Mark E.

    2007-01-01

    This article describes an assignment in a History of Psychology course used to enhance student retention of material and increase student interest and discussion of the long-standing debate between humanistic and mechanistic models in psychology. Adapted from William James's (1955) automatic sweetheart question, the assignment asks students to…

  19. A Case-Study Assignment to Teach Theoretical Perspectives in Abnormal Psychology.

    Science.gov (United States)

    Perkins, David V.

    1991-01-01

    Describes an assignment that requires students to organize, prepare, and revise a case study in abnormal behavior. Explains that students employ a single theoretical perspective in preparing a report on a figure from history, literature, the arts, or current events. Discusses the value of the assignment for students. (SG)

  20. 30 CFR 75.524 - Electric face equipment; electric equipment used in return air outby the last open crosscut...

    Science.gov (United States)

    2010-07-01

    ... used in return air outby the last open crosscut; maximum level of alternating or direct electric... other in return air outby the last open crosscut, shall not exceed one ampere as determined from the... Electrical Equipment-General § 75.524 Electric face equipment; electric equipment used in return air outby...

  1. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  2. Quality Assurance of UMLS Semantic Type Assignments Using SNOMED CT Hierarchies.

    Science.gov (United States)

    Gu, H; Chen, Y; He, Z; Halper, M; Chen, L

    2016-01-01

    The Unified Medical Language System (UMLS) is one of the largest biomedical terminological systems, with over 2.5 million concepts in its Metathesaurus repository. The UMLS's Semantic Network (SN) with its collection of 133 high-level semantic types serves as an abstraction layer on top of the Metathesaurus. In particular, the SN elaborates an aspect of the Metathesaurus's concepts via the assignment of one or more types to each concept. Due to the scope and complexity of the Metathesaurus, errors are all but inevitable in this semantic-type assignment process. To develop a semi-automated methodology to help assure the quality of semantic-type assignments within the UMLS. The methodology uses a cross-validation strategy involving SNOMED CT's hierarchies in combination with UMLS semantic types. Semantically uniform, disjoint concept groups are generated programmatically by partitioning the collection of all concepts in the same SNOMED CT hierarchy according to their respective semantic-type assignments in the UMLS. Domain experts are then called upon to review the concepts in any group having a small number of concepts. It is our hypothesis that a semantic-type assignment combination applicable only to a very small number of concepts in a SNOMED CT hierarchy is an indicator of potential problems. The methodology was applied to the UMLS 2013AA release along with the SNOMED CT from January 2013. An overall error rate of 33% was found for concepts proposed by the quality-assurance methodology. Supporting our hypothesis, that number was four times higher than the error rate found in control samples. The results show that the quality-assurance methodology can aid in effective and efficient identification of UMLS semantic-type assignment errors.

  3. ZAP: a distributed channel assignment algorithm for cognitive radio networks

    OpenAIRE

    Junior , Paulo Roberto ,; Fonseca , Mauro; Munaretto , Anelise; Viana , Aline ,; Ziviani , Artur

    2011-01-01

    Abstract We propose ZAP, an algorithm for the distributed channel assignment in cognitive radio (CR) networks. CRs are capable of identifying underutilized licensed bands of the spectrum, allowing their reuse by secondary users without interfering with primary users. In this context, efficient channel assignment is challenging as ideally it must be simple, incur acceptable communication overhead, provide timely response, and be adaptive to accommodate frequent changes in the network. Another ...

  4. Relationship Structures and Semantic Type Assignments of the UMLS Enriched Semantic Network

    Science.gov (United States)

    Zhang, Li; Halper, Michael; Perl, Yehoshua; Geller, James; Cimino, James J.

    2005-01-01

    Objective: The Enriched Semantic Network (ESN) was introduced as an extension of the Unified Medical Language System (UMLS) Semantic Network (SN). Its multiple subsumption configuration and concomitant multiple inheritance make the ESN's relationship structures and semantic type assignments different from those of the SN. A technique for deriving the relationship structures of the ESN's semantic types and an automated technique for deriving the ESN's semantic type assignments from those of the SN are presented. Design: The technique to derive the ESN's relationship structures finds all newly inherited relationships in the ESN. All such relationships are audited for semantic validity, and the blocking mechanism is used to block invalid relationships. The mapping technique to derive the ESN's semantic type assignments uses current SN semantic type assignments and preserves nonredundant categorizations, while preventing new redundant categorizations. Results: Among the 426 newly inherited relationships, 326 are deemed valid. Seven blockings are applied to avoid inheritance of the 100 invalid relationships. Sixteen semantic types have different relationship structures in the ESN as compared to those in the SN. The mapping of semantic type assignments from the SN to the ESN avoids the generation of 26,950 redundant categorizations. The resulting ESN contains 138 semantic types, 149 IS-A links, 7,303 relationships, and 1,013,876 semantic type assignments. Conclusion: The ESN's multiple inheritance provides more complete relationship structures than in the SN. The ESN's semantic type assignments avoid the existing redundant categorizations appearing in the SN and prevent new ones that might arise due to multiple parents. Compared to the SN, the ESN provides a more accurate unifying semantic abstraction of the UMLS Metathesaurus. PMID:16049233

  5. 48 CFR 870.115 - Food service equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Food service equipment... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.115 Food service equipment. (a) All new food service equipment purchased for Dietetic Service through other than Defense General...

  6. Diagnostic x-ray equipment and its use

    International Nuclear Information System (INIS)

    1993-01-01

    The guide contains the requirements for the use, structure and operation of diagnostic x-ray equipment necessary to ensure the radiation safety of workers and patients. The guide is intended for the party responsible for operating the x-ray units, the staff operating, installing and maintaining x-ray examination equipment, and companies manufacturing and selling such equipment. Special requirements for mammographic and dental x-ray equipments are given in separate ST guides. (5 refs., 1 figs., 2 tabs.)

  7. Connected Equipment Maturity Model Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Butzbaugh, Joshua B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Whalen, Scott A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-01

    The Connected Equipment Maturity Model (CEMM) evaluates the high-level functionality and characteristics that enable equipment to provide the four categories of energy-related services through communication with other entities (e.g., equipment, third parties, utilities, and users). The CEMM will help the U.S. Department of Energy, industry, energy efficiency organizations, and research institutions benchmark the current state of connected equipment and identify capabilities that may be attained to reach a more advanced, future state.

  8. Auditing the Assignments of Top-Level Semantic Types in the UMLS Semantic Network to UMLS Concepts.

    Science.gov (United States)

    He, Zhe; Perl, Yehoshua; Elhanan, Gai; Chen, Yan; Geller, James; Bian, Jiang

    2017-11-01

    The Unified Medical Language System (UMLS) is an important terminological system. By the policy of its curators, each concept of the UMLS should be assigned the most specific Semantic Types (STs) in the UMLS Semantic Network (SN). Hence, the Semantic Types of most UMLS concepts are assigned at or near the bottom (leaves) of the UMLS Semantic Network. While most ST assignments are correct, some errors do occur. Therefore, Quality Assurance efforts of UMLS curators for ST assignments should concentrate on automatically detected sets of UMLS concepts with higher error rates than random sets. In this paper, we investigate the assignments of top-level semantic types in the UMLS semantic network to concepts, identify potential erroneous assignments, define four categories of errors, and thus provide assistance to curators of the UMLS to avoid these assignments errors. Human experts analyzed samples of concepts assigned 10 of the top-level semantic types and categorized the erroneous ST assignments into these four logical categories. Two thirds of the concepts assigned these 10 top-level semantic types are erroneous. Our results demonstrate that reviewing top-level semantic type assignments to concepts provides an effective way for UMLS quality assurance, comparing to reviewing a random selection of semantic type assignments.

  9. My Favorite Assignment: From the ABC 2010 Annual Convention, Chicago, Illinois

    Science.gov (United States)

    Whalen, D. Joel

    2011-01-01

    The seven Favorite Assignments featured in this article were originally presented at the 2010 ABC Annual Convention, Chicago, Illinois. The reader can consider a variety of learning objectives from team building to persuasion, application of electronic media to face-to-face communication, and much more. Some Favorite Assignments take a full…

  10. 20 CFR 658.411 - Filing and assignment of JS-related complaints.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Filing and assignment of JS-related... Agency Js Complaint System § 658.411 Filing and assignment of JS-related complaints. (a) JS-related... office personnel shall be as follows: (1) All JS-related complaints filed with a local office, and...

  11. 42 CFR 424.73 - Prohibition of assignment of claims by providers.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Prohibition of assignment of claims by providers. 424.73 Section 424.73 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND... and Reassignment of Claims § 424.73 Prohibition of assignment of claims by providers. (a) Basic...

  12. 76 FR 42706 - Amendment of Inspector General Operations & Reporting System Audit, Assignment, and Timesheet...

    Science.gov (United States)

    2011-07-19

    ... Operations & Reporting System Audit, Assignment, and Timesheet Files (EPA-42) AGENCY: Environmental... (IGOR) System Audit, Assignment, and Timesheet Files (EPA-42) to the Inspector General Enterprise Management System (IGEMS) Audit, Assignment, and Timesheet Modules. DATES: Effective Dates: Persons wishing...

  13. Concurrent Mass Measurement and Laser Spectroscopy for Unambiguous Isomeric State Assignment

    Science.gov (United States)

    Lascar, Daniel; Babcock, Carla; Henderson, Jack; Pearson, Matt

    2017-09-01

    Recent work by the TITAN group at TRIUMF on isomeric state mass measurements of odd-A, neutron-rich cadmium nuclei has shown a disconnect between experiment and theory in 127 g , mCd. The spin and parity assignments of the ground and isomeric states are assigned as 3/2+ and 11/2-, respectively, primarily via systematic arguments. Conversely, state of the art shell model and ab initio calculations show a reversal of the states, predicting a ground state of 11/2- and a 3/2+ isomer. Penning Trap Mass Spectrometry (PTMS) can measure the energy separation between the ground state and the isomer without ambiguity but cannot, on its own, comment on the spin and parity. Collinear Laser Spectroscopy (CLS) experiments have been performed on 127Cd and have elegantly demonstrated the existence of both 3/2+ and 11/2- states. What CLS cannot do, on its own, is assign an ordering to those states. If, however, a PTMS and CLS experiment could be performed concurrently using identical beams from the same facility then there exists sufficient information shared between both experiments that a definitive assignment can be made. We present a concept for a new slate of measurements using existing experimental facilities simultaneously, with shared resources, to definitively assign spin and parity for ground and isomeric states in short-lived nuclei.

  14. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Dong Hee; KIm, Hyeong Gyun [Dept. of Radiological Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test.

  15. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    International Nuclear Information System (INIS)

    Hong, Dong Hee; KIm, Hyeong Gyun

    2016-01-01

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test

  16. Incentivized optimal advert assignment via utility decomposition

    NARCIS (Netherlands)

    Kelly, F.; Key, P.; Walton, N.

    2014-01-01

    We consider a large-scale Ad-auction where adverts are assigned over a potentially infinite number of searches. We capture the intrinsic asymmetries in information between advertisers, the advert platform and the space of searches: advertisers know and can optimize the average performance of their

  17. 9 CFR 355.10 - Assignment of inspectors.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION CERTIFIED PRODUCTS FOR DOGS, CATS, AND OTHER CARNIVORA; INSPECTION... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Assignment of inspectors. 355.10 Section 355.10 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  18. A game theoretic approach to assignment problems

    NARCIS (Netherlands)

    Klijn, F.

    2000-01-01

    Game theory deals with the mathematical modeling and analysis of conflict and cooperation in the interaction of multiple decision makers. This thesis adopts two game theoretic methods to analyze a range of assignment problems that arise in various economic situations. The first method has as

  19. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  20. Assignments of rights and obligations under a gas sales contract

    International Nuclear Information System (INIS)

    Kowch, J.R.M.

    1996-01-01

    A general overview of the principles of assignment in a gas sales contract was presented. Assignment is a process wherein the rights or obligations under a contract are transferred from one of the contracting parties to a third party. It is, in other words, the introduction of a new party to the original contractual relationship. Under the rights and obligations of a gas sales contract, the most important right of the seller is to have its gas taken and to be paid. Likewise, the most important obligation of the buyer is to take the gas and pay for it. An assignment by either party has the potential to alter the original expectations of the parties or the basis of which they committed to the contract in the first place. Prior to deregulation and unbundling initiatives, gas sellers and buyers could enter a 20 year sales contract and deal exclusively with each other over the entire 20 year term. Since deregulation, there are more players, and a higher level of corporate acquisitions, divestitures, rationalizations, and restructuring. Today, there are greater chances than ever before that the original party to a contract may change, or that certain rights and obligations may be assigned to a third party and affect the expectations under the contract

  1. A career exploration assignment for first-year pharmacy students.

    Science.gov (United States)

    Sholy, Lydia; Zeenny, Rony

    2013-11-12

    To develop, implement, and assess student-learning outcomes from an assignment designed to expose first-year pharmacy students (P1) to a wide range of pharmacy career pathways. Students enrolled in a required Pharmacy Practice and Ethics course at the Lebanese American University chose 1 pharmacist career to investigate from a suggested list of 28 career pathways. Students completed a literature review on the selected career, interviewed a pharmacist practicing that career path in Lebanon, wrote a paper, and prepared and delivered a summary presentation to their classmates about the career pathway. Students peer evaluated their classmates after each presentation. More than 85% of the students scored ≥70% on the assignment based on their achievement of student learning outcomes. Responses on an anonymous questionnaire showed that more than 94.6% of students were satisfied with the extent to which the course allowed them to meet the established learning outcomes. A career exploration assignment provided pharmacy students with an opportunity to widen their knowledge and understanding of the different career pathways that are available for them.

  2. Target assignment for security officers to K targets (TASK)

    International Nuclear Information System (INIS)

    Rowland, J.R.; Shelton, K.W.; Stunkel, C.B.

    1983-02-01

    A probabilistic algorithm is developed to provide an optimal Target Assignment for Security officers to K targets (TASK) using a maximin criterion. Under the assumption of only a limited number (N) of security officers, the TASK computer model determines deployment assignments which maximize the system protection against sabotage by an adversary who may select any link in the system, including the weakest, for the point of attack. Applying the TASK model to a hypothetical nuclear facility containing a nine-level building reveals that aggregate targets covering multiple vital areas should be utilized to reduce the number of possible target assignments to a value equal to or only slightly larger than N. The increased probability that a given aggregate target is covered by one or more security officers offsets the slight decrease in interruption probability due to its occurring earlier in the adversary's path. In brief, the TASK model determines the optimal maximin deployment strategy for limited numbers of security officers and calculates a quantitative measure of the resulting system protection

  3. Future development of IR thermovision weather satellite equipment

    Science.gov (United States)

    Listratov, A. V.

    1974-01-01

    The self radiation of the surface being viewed is used for image synthesis in IR thermovision equipment. The installation of such equipment aboard weather satellites makes it possible to obtain cloud cover pictures of the earth's surface in a complete orbit, regardless of the illumination conditions, and also provides quantitative information on the underlying surface temperature and cloud top height. Such equipment is used successfully aboard the Soviet satellites of the Meteor system, and experimentally on the American satellites of the Nimbus series. With regard to surface resolution, the present-day IR weather satellite equipment is inferior to the television equipment. This is due primarily to the comparatively low detectivity of the IR detectors used. While IR equipment has several fundamental advantages in comparison with the conventional television equipment, the problem arises of determining the possibility for future development of weather satellite IR thermovision equipment. Criteria are examined for evaluating the quality of IR.

  4. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  5. Evaluation of a Brief Homework Assignment Designed to Reduce Citation Problems

    Science.gov (United States)

    Schuetze, Pamela

    2004-01-01

    I evaluated a brief homework assignment designed to reduce citation problems in research-based term papers. Students in 2 developmental psychology classes received a brief presentation and handout defining plagiarism with tips on how to cite sources to avoid plagiarizing. In addition, students in 1 class completed 2 brief homework assignments in…

  6. Integrating Graphing Assignments into a Money and Banking Course Using FRED

    Science.gov (United States)

    Staveley-O'Carroll, James

    2018-01-01

    Over the course of one semester, six empirical assignments that utilize FRED are used to introduce students of money and banking courses to the economic analysis required for the conduct of monetary policy. The first five assignments cover the following topics: inflation, bonds and stocks, monetary aggregates, the Taylor rule, and employment.…

  7. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  8. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  9. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  10. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  11. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  12. 47 CFR 76.1621 - Equipment compatibility offer.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment compatibility offer. 76.1621 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1621 Equipment compatibility offer. Cable system... offer to supply each subscriber with special equipment that will enable the simultaneous reception of...

  13. 45 CFR 95.707 - Equipment management and disposition.

    Science.gov (United States)

    2010-10-01

    ... participation in the costs of replacement equipment shall be limited to the additional outlay. (4) If the... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment management and disposition. 95.707... PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.707 Equipment management and disposition...

  14. 14 CFR 25.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 25.1441... Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, the... oxygen available in each source of supply. (d) The oxygen flow rate and the oxygen equipment for...

  15. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  16. 49 CFR 238.230 - Safety appliances-new equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Safety appliances-new equipment. 238.230 Section... I Passenger Equipment § 238.230 Safety appliances—new equipment. (a) Applicability. This section..., 2007, that is equipped with a safety appliance, required by the “manner of application” provisions in...

  17. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  18. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  19. A demand assignment control in international business satellite communications network

    Science.gov (United States)

    Nohara, Mitsuo; Takeuchi, Yoshio; Takahata, Fumio; Hirata, Yasuo

    An experimental system is being developed for use in an international business satellite (IBS) communications network based on demand-assignment (DA) and TDMA techniques. This paper discusses its system design, in particular from the viewpoints of a network configuration, a DA control, and a satellite channel-assignment algorithm. A satellite channel configuration is also presented along with a tradeoff study on transmission rate, HPA output power, satellite resource efficiency, service quality, and so on.

  20. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  1. Evaluation of a radar-based proximity warning system for off-highway dump trucks.

    Science.gov (United States)

    Ruff, Todd

    2006-01-01

    A radar-based proximity warning system was evaluated by researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health to determine if the system would be effective in detecting objects in the blind spots of an off-highway dump truck. An average of five fatalities occur each year in surface mines as a result of an equipment operator not being aware of a smaller vehicle, person or change in terrain near the equipment. Sensor technology that can detect such obstacles and that also is designed for surface mining applications is rare. Researchers worked closely with the radar system manufacturer to test and modify the system on large, off-highway dump trucks at a surface mine over a period of 2 years. The final system was thoroughly evaluated by recording video images from a camera on the rear of the truck and by recording all alarms from the rear-mounted radar. Data show that the system reliably detected small vehicles, berms, people and other equipment. However, alarms from objects that posed no immediate danger were common, supporting the assertion that sensor-based systems for proximity warning should be used in combination with other devices, such as cameras, that would allow the operator to check the source of any alarm.

  2. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  3. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  4. 40 CFR 63.1363 - Standards for equipment leaks.

    Science.gov (United States)

    2010-07-01

    ... the replacement equipment and the actual date of delivery of the replacement equipment. (E) The date... heavy liquid service. Information, data, and analysis used to determine that a piece of equipment or... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Standards for equipment leaks. 63.1363...

  5. 41 CFR 109-50.4801 - Equipment Gift Agreement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment Gift Agreement... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.48-Exhibits § 109-50.4801 Equipment Gift Agreement. (a) The following Equipment Gift Agreement format will be used to provide gifts of excess and/or surplus equipment...

  6. 36 CFR 1207.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1207.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... as follows: (1) Items of equipment with a current per-unit fair market value of less than $5,000 may...) Items of equipment with a current per unit fair market value in excess of $5,000 may be retained or sold...

  7. Management of radiological related equipments. Creating the equipment management database and analysis of the repair and maintenance records

    International Nuclear Information System (INIS)

    Eguchi, Megumu; Taguchi, Keiichi; Oota, Takashi; Kajiwara, Hiroki; Ono, Kiyotune; Hagio, Kiyofumi; Uesugi, Ekizo; Kajishima, Tetuo; Ueda, Kenji

    2002-01-01

    In 1997, we established the committee of equipments maintenance and management in our department. We designed the database in order to classify and register all the radiological related equipments using Microsoft Access. The management of conditions and cost of each equipment has become easier, by keeping and recording the database in the equipments management ledger and by filing the history of repairs or maintenances occurred to modalities. We then accounted numbers, cost of repairs and downtimes from the data of the repair and maintenance records for four years, and we reexamined the causal analysis of failures and the contents of the regular maintenance for CT and MRI equipments that had shown the higher numbers of repairs. Consequently, we have found the improvement of registration method of the data and the more economical way to use of the cost of repair. (author)

  8. 7 CFR 3015.168 - Disposal of equipment.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.168 Disposal of equipment. When original or replacement equipment is no longer to be used in projects or programs currently or... 7 Agriculture 15 2010-01-01 2010-01-01 false Disposal of equipment. 3015.168 Section 3015.168...

  9. 40 CFR 63.1434 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1434... Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63.1434 Equipment leak provisions. (a) The owner or operator of each affected source shall comply with the HON equipment leak...

  10. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  11. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  12. Fluidity models in ancient Greece and current practices of sex assignment.

    Science.gov (United States)

    Chen, Min-Jye; McCann-Crosby, Bonnie; Gunn, Sheila; Georgiadis, Paraskevi; Placencia, Frank; Mann, David; Axelrad, Marni; Karaviti, L P; McCullough, Laurence B

    2017-06-01

    Disorders of sexual differentiation such as androgen insensitivity and gonadal dysgenesis can involve an intrinsic fluidity at different levels, from the anatomical and biological to the social (gender) that must be considered in the context of social constraints. Sex assignment models based on George Engel's biopsychosocial aspects model of biology accept fluidity of gender as a central concept and therefore help establish expectations within the uncertainty of sex assignment and anticipate potential changes. The biology underlying the fluidity inherent to these disorders should be presented to parents at diagnosis, an approach that the gender medicine field should embrace as good practice. Greek mythology provides many accepted archetypes of change, and the ancient Greek appreciation of metamorphosis can be used as context with these patients. Our goal is to inform expertise and optimal approaches, knowing that this fluidity may eventually necessitate sex reassignment. Physicians should provide sex assignment education based on different components of sexual differentiation, prepare parents for future hormone-triggered changes in their children, and establish a sex-assignment algorithm. Copyright © 2017 Elsevier Inc. All rights reserved.

  13. Edge-assignment and figure-ground segmentation in short-term visual matching.

    Science.gov (United States)

    Driver, J; Baylis, G C

    1996-12-01

    Eight experiments examined the role of edge-assignment in a contour matching task. Subjects judged whether the jagged vertical edge of a probe shape matched the jagged edge that divided two adjoining shapes in an immediately preceding figure-ground display. Segmentation factors biased assignment of this dividing edge toward a figural shape on just one of its sides. Subjects were faster and more accurate at matching when the probe edge had a corresponding assignment. The rapid emergence of this effect provides an on-line analog of the long-term memory advantage for figures over grounds which Rubin (1915/1958) reported. The present on-line advantage was found when figures were defined by relative contrast and size, or by symmetry, and could not be explained solely by the automatic drawing of attention toward the location of the figural region. However, deliberate attention to one region of an otherwise ambiguous figure-ground display did produce the advantage. We propose that one-sided assignment of dividing edges may be obligatory in vision.

  14. Fluidity models in ancient Greece and current practices of sex assignment

    Science.gov (United States)

    Chen, Min-Jye; McCann-Crosby, Bonnie; Gunn, Sheila; Georgiadis, Paraskevi; Placencia, Frank; Mann, David; Axelrad, Marni; Karaviti, L.P; McCullough, Laurence B.

    2018-01-01

    Disorders of sexual differentiation such as androgen insensitivity and gonadal dysgenesis can involve an intrinsic fluidity at different levels, from the anatomical and biological to the social (gender) that must be considered in the context of social constraints. Sex assignment models based on George Engel’s biopsychosocial aspects model of biology accept fluidity of gender as a central concept and therefore help establish expectations within the uncertainty of sex assignment and anticipate potential changes. The biology underlying the fluidity inherent to these disorders should be presented to parents at diagnosis, an approach that the gender medicine field should embrace as good practice. Greek mythology provides many accepted archetypes of change, and the ancient Greek appreciation of metamorphosis can be used as context with these patients. Our goal is to inform expertise and optimal approaches, knowing that this fluidity may eventually necessitate sex reassignment. Physicians should provide sex assignment education based on different components of sexual differentiation, prepare parents for future hormone-triggered changes in their children, and establish a sex-assignment algorithm. PMID:28478088

  15. Assignment of stock keeping units to parallel undirectional picking

    Directory of Open Access Journals (Sweden)

    Matthews, Jason

    2015-05-01

    Full Text Available An order picking system consisting of a number of parallel unidirectional picking lines is investigated. Stock keeping units (SKUs that are grouped by product type into distributions (DBNs are assigned daily to available picking lines. A mathematical programming formulation and its relaxations is presented. A greedy insertion and a greedy phased insertion are further introduced to obtain feasible results within usable computation times for all test cases. The walking distance of the pickers was shown to decrease by about 22 per cent compared with the current assignment approach. However, product handling and operational risk increases.

  16. Distributed Schemes for Crowdsourcing-Based Sensing Task Assignment in Cognitive Radio Networks

    Directory of Open Access Journals (Sweden)

    Linbo Zhai

    2017-01-01

    Full Text Available Spectrum sensing is an important issue in cognitive radio networks. The unlicensed users can access the licensed wireless spectrum only when the licensed wireless spectrum is sensed to be idle. Since mobile terminals such as smartphones and tablets are popular among people, spectrum sensing can be assigned to these mobile intelligent terminals, which is called crowdsourcing method. Based on the crowdsourcing method, this paper studies the distributed scheme to assign spectrum sensing task to mobile terminals such as smartphones and tablets. Considering the fact that mobile terminals’ positions may influence the sensing results, a precise sensing effect function is designed for the crowdsourcing-based sensing task assignment. We aim to maximize the sensing effect function and cast this optimization problem to address crowdsensing task assignment in cognitive radio networks. This problem is difficult to be solved because the complexity of this problem increases exponentially with the growth in mobile terminals. To assign crowdsensing task, we propose four distributed algorithms with different transition probabilities and use a Markov chain to analyze the approximation gap of our proposed schemes. Simulation results evaluate the average performance of our proposed algorithms and validate the algorithm’s convergence.

  17. A New Approach to Weapon-Target Assignment in Cooperative Air Combat

    Directory of Open Access Journals (Sweden)

    Yi-zhe Chang

    2017-01-01

    Full Text Available A new approach to solving weapon-target assignment (WTA problem is proposed in this paper. Firstly, relative superiority that lays the foundation for assignment is calculated based on the combat power energy of the fighters. Based on the relative superiority, WTA problem is formulated. Afterwards, a hybrid algorithm consisting of improved artificial fish swarm algorithm (AFSA and improved harmony search (HS is introduced and furthermore applied to solve the assignment formulation. Finally, the proposed approach is validated by eight representative benchmark functions and two concrete cooperative air combat examples. The results show that the approach proposed in this paper achieves good performances in solving WTA problem in cooperative air combat.

  18. 46 CFR 96.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 96.40-1 Section 96.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 96.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  19. 46 CFR 195.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pilot boarding equipment. 195.40-1 Section 195.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 195.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  20. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  1. 14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne thunderstorm detection equipment... Aircraft and Equipment § 135.173 Airborne thunderstorm detection equipment requirements. (a) No person may... the aircraft is equipped with either approved thunderstorm detection equipment or approved airborne...

  2. 14 CFR 25.1439 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... also enable the flightcrew to use radio equipment. (4) The part of the equipment protecting the eyes... Regulations: (1) The equipment must be designed to protect the appropriate crewmember from smoke, carbon... must include— (i) Masks covering the eyes, nose and mouth, or (ii) Masks covering the nose and mouth...

  3. 40 CFR 63.769 - Equipment leak standards.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Equipment leak standards. 63.769... § 63.769 Equipment leak standards. (a) This section applies to equipment subject to this subpart and... release to detect leaks, except under the following conditions. (i) The owner or operator has obtained...

  4. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...

  5. Cost analysis for heavy equipment in earthfill work - An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

    Science.gov (United States)

    Arifin, Muhammad Faizal Ardhiansyah

    2017-03-01

    Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.

  6. 46 CFR 32.90-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Pilot boarding equipment. 32.90-1 Section 32.90-1... REQUIREMENTS Pilot Boarding Equipment § 32.90-1 Pilot boarding equipment. (a) This section applies to each... must have suitable pilot boarding equipment available for use on each side of the vessel. If a vessel...

  7. FISCAL DECENTRALIZATION IN THE DRC: EVIDENCE OFREVENUE ASSIGNMENT

    Directory of Open Access Journals (Sweden)

    Angelita Kithatu-Kiwekete

    2017-07-01

    Full Text Available The rationalefor central government to devolve resources for service provisionhas been debated in decentralization literature. Decentralization enhancesdemocracy,encouragesparticipation in local development initiativesandpromotes local political accountability.This discourse has been complemented bythe implementation of fiscal decentralization to increase the ability of sub-nationalgovernment in financing municipal service delivery. Fiscal decentralization hasoften been adopted by African statessince the onset ofthe New PublicManagement erain an effortto improvethe standard ofgovernance. The concernis that African states have taken minimal steps to adopt fiscal devolution thatpromotes revenue assignment which in turn limits sub-nationalgovernments’ability to generate own source revenues.This article examines the revenue assignment function of fiscal decentralization inthe Democratic Republic of Congo(DRCinthelight of decentralizationconcerns that have been raised by civil society, as the country charts its course todemocracy. The article is a desktop study that will consider documents andpoliciesin theDRCon thenational, provincialand locallevel as far asstaterevenue sourcesare concerned. Revenue assignment should enable DRC’sprovinces and local authoritiestogeneratesignificantrevenueindependently.However, post-conflict reconstruction and development efforts in the Great Lakesregion and in the DRC have largely isolated decentralization which wouldotherwise entrench local fiscalautonomy infinancing for local services anddevelopment. The article concludes that revenue generation for local authoritiesandtheprovinces in the DRC is still very centralised by the national government.Thearticleproposes policy recommendations that will be useful for the country toensurethatdecentralization effortsinclude fiscal devolution toenhance thefinancing for local development initiatives.

  8. Generalised Assignment Matrix Methodology in Linear Programming

    Science.gov (United States)

    Jerome, Lawrence

    2012-01-01

    Discrete Mathematics instructors and students have long been struggling with various labelling and scanning algorithms for solving many important problems. This paper shows how to solve a wide variety of Discrete Mathematics and OR problems using assignment matrices and linear programming, specifically using Excel Solvers although the same…

  9. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  10. Proposed criteria for the evaluation of an address assignment scheme in Botswana

    CSIR Research Space (South Africa)

    Ditsela, J

    2011-06-01

    Full Text Available propose criteria for an address assignment scheme in Botswana: a single set of place or area names; different addresses types for urban, rural and farm areas; principles for address numbering assignment; integration of different referencing systems; and a...

  11. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  12. 29 CFR 1926.603 - Pile driving equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Pile driving equipment. 1926.603 Section 1926.603 Labor... Operations § 1926.603 Pile driving equipment. (a) General requirements. (1) Boilers and piping systems which are a part of, or used with, pile driving equipment shall meet the applicable requirements of the...

  13. 46 CFR 71.25-25 - Hull equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Hull equipment. 71.25-25 Section 71.25-25 Shipping COAST... Inspection § 71.25-25 Hull equipment. (a) At each annual inspection, the inspector shall conduct the following tests and inspections of hull equipment: (1) All subdivision bulkheads shall be examined to...

  14. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    International Nuclear Information System (INIS)

    1994-01-01

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs

  15. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs.

  16. Improvement in Student Data Analysis Skills after Out-of-Class Assignments

    Directory of Open Access Journals (Sweden)

    Kristen Lee Williams Walton

    2016-12-01

    Full Text Available The ability to understand and interpret data is a critical aspect of scientific thinking.  However, although data analysis is often a focus in biology majors classes, many textbooks for allied health majors classes are primarily content-driven and do not include substantial amounts of experimental data in the form of graphs and figures.  In a lower-division allied health majors microbiology class, students were exposed to data from primary journal articles as take-home assignments and their data analysis skills were assessed in a pre-/posttest format.  Students were given 3 assignments that included data analysis questions.  Assignments ranged from case studies that included a figure from a journal article to reading a short journal article and answering questions about multiple figures or tables.  Data were represented as line or bar graphs, gel photographs, and flow charts.  The pre- and posttest was designed incorporating the same types of figures to assess whether the assignments resulted in any improvement in data analysis skills.  The mean class score showed a small but significant improvement from the pretest to the posttest across three semesters of testing.  Scores on individual questions testing accurate conclusions and predictions improved the most.  This supports the conclusion that a relatively small number of out-of-class assignments through the semester resulted in a significant improvement in data analysis abilities in this population of students.

  17. 32 CFR 34.21 - Real property and equipment.

    Science.gov (United States)

    2010-07-01

    ... original equipment as trade-in or sell it and use the proceeds to offset the costs of the replacement... request approval to use equipment as trade-in or offset for replacement equipment (see paragraph (e)(1)(i... 32 National Defense 1 2010-07-01 2010-07-01 false Real property and equipment. 34.21 Section 34.21...

  18. Model morphing and sequence assignment after molecular replacement

    Energy Technology Data Exchange (ETDEWEB)

    Terwilliger, Thomas C., E-mail: terwilliger@lanl.gov [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States); Read, Randy J. [University of Cambridge, Cambridge Institute for Medical Research, Cambridge CB2 0XY (United Kingdom); Adams, Paul D. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Brunger, Axel T. [Stanford University, 318 Campus Drive West, Stanford, CA 94305 (United States); Afonine, Pavel V. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Hung, Li-Wei [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States)

    2013-11-01

    A procedure for model building is described that combines morphing a model to match a density map, trimming the morphed model and aligning the model to a sequence. A procedure termed ‘morphing’ for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Å and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003 ▶) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package.

  19. Model morphing and sequence assignment after molecular replacement

    International Nuclear Information System (INIS)

    Terwilliger, Thomas C.; Read, Randy J.; Adams, Paul D.; Brunger, Axel T.; Afonine, Pavel V.; Hung, Li-Wei

    2013-01-01

    A procedure for model building is described that combines morphing a model to match a density map, trimming the morphed model and aligning the model to a sequence. A procedure termed ‘morphing’ for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Å and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003 ▶) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package

  20. Accuracy of administratively-assigned ancestry for diverse populations in an electronic medical record-linked biobank.

    Directory of Open Access Journals (Sweden)

    Jacob B Hall

    Full Text Available Recently, the development of biobanks linked to electronic medical records has presented new opportunities for genetic and epidemiological research. Studies based on these resources, however, present unique challenges, including the accurate assignment of individual-level population ancestry. In this work we examine the accuracy of administratively-assigned race in diverse populations by comparing assigned races to genetically-defined ancestry estimates. Using 220 ancestry informative markers, we generated principal components for patients in our dataset, which were used to cluster patients into groups based on genetic ancestry. Consistent with other studies, we find a strong overall agreement (Kappa  = 0.872 between genetic ancestry and assigned race, with higher rates of agreement for African-descent and European-descent assignments, and reduced agreement for Hispanic, East Asian-descent, and South Asian-descent assignments. These results suggest caution when selecting study samples of non-African and non-European backgrounds when administratively-assigned race from biobanks is used.

  1. 33 CFR 142.24 - Use of equipment.

    Science.gov (United States)

    2010-07-01

    ... CONTINENTAL SHELF ACTIVITIES WORKPLACE SAFETY AND HEALTH Personal Protective Equipment § 142.24 Use of equipment. (a) Each holder of a lease or permit issued under the Act shall ensure that all personnel who are required by this subpart to use or wear personal protective equipment do so when within the lease area or...

  2. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  3. 27 CFR 6.43 - Sale of equipment.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Furnishing Things of Value § 6.43 Sale of equipment. A transaction in which equipment is sold to a retailer by an industry member, except as provided.... Further, the negotiation by an industry member of a special price to a retailer for equipment from an...

  4. 46 CFR 28.130 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Survival craft equipment. 28.130 Section 28.130 Shipping... INDUSTRY VESSELS Requirements for All Vessels § 28.130 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, effective for the purpose it is intended to serve, and...

  5. The UK market for gaseous emissions control equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The report analyses the changes in demand for gaseous emissions control equipment in the United Kingdom over the next 5 years. It discusses the factors affecting demand such as legislation reporting of environmental performance, and economic factors. It looks at environmental expenditure by UK industry. Markets are examined, for VOC abatement systems; thermal incinerators; adsorption equipment; catalytic oxidisers; absorption equipment; biological treatments; cryogenic equipment; SO{sub x} abatement equipment; wet FGD; wet dry FGD, dry scrubbers; NOx abatement systems; selective catalytic reduction; and selective non-catalytic reduction. Profiles are given of 16 leading suppliers.

  6. An Evaluation Method of Equipment Reliability Configuration Management

    Science.gov (United States)

    Wang, Wei; Feng, Weijia; Zhang, Wei; Li, Yuan

    2018-01-01

    At present, many equipment development companies have been aware of the great significance of reliability of the equipment development. But, due to the lack of effective management evaluation method, it is very difficult for the equipment development company to manage its own reliability work. Evaluation method of equipment reliability configuration management is to determine the reliability management capabilities of equipment development company. Reliability is not only designed, but also managed to achieve. This paper evaluates the reliability management capabilities by reliability configuration capability maturity model(RCM-CMM) evaluation method.

  7. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  8. 28 CFR 345.35 - Assignments to FPI.

    Science.gov (United States)

    2010-07-01

    ..., color, religion, ethnic origin, age, or disability. (b) The SOI ordinarily makes assignments based on... course in pre-industrial training or on-the-job training (as available) before promotion to pay grade four. (2) An inmate who has not successfully completed pre-industrial or on-the-job training remains at...

  9. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  10. Fragment assignment in the cloud with eXpress-D

    Science.gov (United States)

    2013-01-01

    Background Probabilistic assignment of ambiguously mapped fragments produced by high-throughput sequencing experiments has been demonstrated to greatly improve accuracy in the analysis of RNA-Seq and ChIP-Seq, and is an essential step in many other sequence census experiments. A maximum likelihood method using the expectation-maximization (EM) algorithm for optimization is commonly used to solve this problem. However, batch EM-based approaches do not scale well with the size of sequencing datasets, which have been increasing dramatically over the past few years. Thus, current approaches to fragment assignment rely on heuristics or approximations for tractability. Results We present an implementation of a distributed EM solution to the fragment assignment problem using Spark, a data analytics framework that can scale by leveraging compute clusters within datacenters–“the cloud”. We demonstrate that our implementation easily scales to billions of sequenced fragments, while providing the exact maximum likelihood assignment of ambiguous fragments. The accuracy of the method is shown to be an improvement over the most widely used tools available and can be run in a constant amount of time when cluster resources are scaled linearly with the amount of input data. Conclusions The cloud offers one solution for the difficulties faced in the analysis of massive high-thoughput sequencing data, which continue to grow rapidly. Researchers in bioinformatics must follow developments in distributed systems–such as new frameworks like Spark–for ways to port existing methods to the cloud and help them scale to the datasets of the future. Our software, eXpress-D, is freely available at: http://github.com/adarob/express-d. PMID:24314033

  11. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  12. Position statement. The right to accept or reject an assignment. American Nurses Association.

    Science.gov (United States)

    1996-01-01

    The American Nurses Association (ANA) believes that nurses should reject assignment that puts patients or themselves in serious, immediate jeopardy. ANA supports the nurses obligation to reject an assignment in these situations even where there is not a specific legal protection for rejecting such an assignment. The professional obligations to the nurse to safeguard clients are grounded in the ethical norms of the profession, the Standards of Clinical Nursing Practice and state nurse practice acts.

  13. Strategy for conformity of non-standard cryogenic equipment

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    CERN as an intergovernmental organization establishes its own Safety Rules as necessary for its proper functioning. In particular, the CERN General Safety Instruction for cryogenic equipment requires that cryogenic pressure equipment at CERN shall comply with the European Pressure Equipment Directive (PED). However, due to the particular features of some of the cryogenic equipment required for the accelerators, as well as the existence of international collaborations with in-kind contributions from non-EU countries, full compliance with the PED may not always be achieved. This situation is foreseen in the Safety Rules, where CERN HSE will define the Safety requirements applicable to such equipment as well as any eventual additional compensatory measure as to ensure a commensurate level of Safety for our pressure equipment. Where compliance with PED may not be achieved, CERN HSE will become the de facto Notified Body and therefore be in charge of the assessment of the conformity of the equipment to the applica...

  14. Methodology for assessing laser-based equipment

    Science.gov (United States)

    Pelegrina-Bonilla, Gabriel; Hermsdorf, Jörg; Thombansen, Ulrich; Abels, Peter; Kaierle, Stefan; Neumann, Jörg

    2017-10-01

    Methodologies for the assessment of technology's maturity are widely used in industry and research. Probably the best known are technology readiness levels (TRLs), initially pioneered by the National Aeronautics and Space Administration (NASA). At the beginning, only descriptively defined TRLs existed, but over time, automated assessment techniques in the form of questionnaires emerged in order to determine TRLs. Originally TRLs targeted equipment for space applications, but the demands on industrial relevant equipment are partly different in terms of, for example, overall costs, product quantities, or the presence of competitors. Therefore, we present a commonly valid assessment methodology with the aim of assessing laser-based equipment for industrial use, in general. The assessment is carried out with the help of a questionnaire, which allows for a user-friendly and easy accessible way to monitor the progress from the lab-proven state to the application-ready product throughout the complete development period. The assessment result is presented in a multidimensional metric in order to reveal the current specific strengths and weaknesses of the equipment development process, which can be used to direct the remaining development process of the equipment in the right direction.

  15. Annual trace-metal load estimates and flow-weighted concentrations of cadmium, lead, and zinc in the Spokane River basin, Idaho and Washington, 1999-2004

    Science.gov (United States)

    Donato, Mary M.

    2006-01-01

    Streamflow and trace-metal concentration data collected at 10 locations in the Spokane River basin of northern Idaho and eastern Washington during 1999-2004 were used as input for the U.S. Geological Survey software, LOADEST, to estimate annual loads and mean flow-weighted concentrations of total and dissolved cadmium, lead, and zinc. Cadmium composed less than 1 percent of the total metal load at all stations; lead constituted from 6 to 42 percent of the total load at stations upstream from Coeur d'Alene Lake and from 2 to 4 percent at stations downstream of the lake. Zinc composed more than 90 percent of the total metal load at 6 of the 10 stations examined in this study. Trace-metal loads were lowest at the station on Pine Creek below Amy Gulch, where the mean annual total cadmium load for 1999-2004 was 39 kilograms per year (kg/yr), the mean estimated total lead load was about 1,700 kg/yr, and the mean annual total zinc load was 14,000 kg/yr. The trace-metal loads at stations on North Fork Coeur d'Alene River at Enaville, Ninemile Creek, and Canyon Creek also were relatively low. Trace-metal loads were highest at the station at Coeur d'Alene River near Harrison. The mean annual total cadmium load was 3,400 kg/yr, the mean total lead load was 240,000 kg/yr, and the mean total zinc load was 510,000 kg/yr for 1999-2004. Trace-metal loads at the station at South Fork Coeur d'Alene River near Pinehurst and the three stations on the Spokane River downstream of Coeur d'Alene Lake also were relatively high. Differences in metal loads, particularly lead, between stations upstream and downstream of Coeur d'Alene Lake likely are due to trapping and retention of metals in lakebed sediments. LOADEST software was used to estimate loads for water years 1999-2001 for many of the same sites discussed in this report. Overall, results from this study and those from a previous study are in good agreement. Observed differences between the two studies are attributable to streamflow

  16. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  17. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  18. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  19. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  20. A Branch-and-Price algorithm for stable workforce assignments with hierarchical skills

    NARCIS (Netherlands)

    Firat, M.; Briskorn, D.; Laugier, A.

    2016-01-01

    This paper deals with assigning hierarchically skilled technicians to jobs by considering preferences. We investigate stability definitions in multi-skill workforce assignments stemming from the notion of blocking pairs as stated in the Marriage model of Gale–Shapley. We propose a Branch-and-Price