WorldWideScience

Sample records for epri simulator qualification

  1. Qualification of RETRAN for simulator applications

    International Nuclear Information System (INIS)

    Harrison, J.F.

    1988-01-01

    The use of full-scope control room replica simulators increased substantially following the accident at Three Mile Island Unit 2. The technical capability required to represent severe events has been included, in varying degrees, in most simulators purchased since the TMI-2 accident. The ability of the instructor to create a large variety of combinations of malfunctions has also greatly expanded. The nuclear industry has developed a standard which establishes the minimum functional requirements for full-scope nuclear control room simulators used for operator training. This standard, ANSI/ANS-3.5, was first issued in 1981 and was reissued in 1985. A method for performing simulator qualification with best estimate analytical data has been proposed in EPRI NP-4243, Analytic Simulator Qualification Methodology. The idea presented there is to choose a set of transients which drive the simulator into all the system conditions (dynamic states) likely to be encountered during operator training. The key observable parameters for each state are compared to analyses performed with the best estimate analytical model The closeness of the comparison determines the fidelity of the simulator. The approach described in EPRI NP-4243 has been adapted for evaluating RETRAN's capability for use in simulator qualification. RETRAN analyses which compare the RETRAN results to plant or test facility data are evaluated with respect to the simulator test matrix documented in EPRI NP-4243

  2. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  3. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  4. Qualification according to PDI's techniques UT EPRI methodology Phased Array for the inspection of vessels of PWR reactor with advanced robotic equipment; Cualificacion segun metodologia PDI de EPRI de te cnicas UT Phased Array para la inspeccion de vasijas de reactor PWR con eq uipos roboticos avanzados

    Energy Technology Data Exchange (ETDEWEB)

    Gadea, J. R.; Gonzalez, P.; Fernandez, F.

    2014-07-01

    The techniques and procedures qualified in the program EPRI PDI are directly applicable in plants whose reference code is ASME XI - specifically the Appendix VIII-, mainly USA and countries in which it is established American PWR technology. While countries with reactors in operation technology ABB (Sweden) or type VVER (Finland and Eastern countries) requires a qualification of specific technical type ENIQ, PDI qualification is a valuable reference since it allows to deal with such qualifications with guarantees. (Author)

  5. An EPRI methodology for determining and monitoring simulator operating limits

    International Nuclear Information System (INIS)

    Eichelberg, R.; Pellechi, M.; Wolf, B.; Colley, R.

    1989-01-01

    Of paramount concern to nuclear utilities today is whether their plant-referenced simulator(s) comply with ANSI/ANS 3.5-1985. Of special interest is Section 4.3 of the Standard which requires, in part, that a means be provided to alert the instructor when certain parameters approach values indicative of events beyond the implemented model or known plant behavior. EPRI established Research Project 2054-2 to develop a comprehensive plan for determining, monitoring, and implementing simulator operating limits. As part of the project, a survey was conducted to identify the current/anticipated approach each of the sampled utilities was using to meet the requirements of Section 4.3. A preliminary methodology was drafted and host utilities interviewed. The interview process led to redefining the methodology. This paper covers the objectives of the EPRI project, survey responses, overview of the methodology, resource requirements and conclusions

  6. The EPRI NDE center after five years

    International Nuclear Information System (INIS)

    Dau, G.J.; Nemzek, T.A.

    1985-01-01

    In 1979, the Electric Power Research Institute (EPRI) established a Nondestructive Evaluation (NDE) Center. The purpose of the Center is to provide the electric utility industry with a dedicated NDE development and field-use-qualification capability. Later, the scope of activities at the NDE Center was expanded. Beginning in 1980, the BWR Owners Group (IGSCC) provided funding necessary to operate the BWR Pipe Remedy Demonstration and Training Facility. In 1984, the Maintenance Equipment Applications Center was established by EPRI. Both functions are co-located within the NDE Center. All three functions share common objectives of providing the electric utility industry with a capability dedicated to assuring reduction to practice of new or improved technology, proof testing, qualification for field use, and obtaining code and regulatory acceptance of qualified methods and training. The purpose of this paper is to describe typical activities of the Center and some of the benefits that have accrued. The next section describes the Center organization, operation, and facility, while the remaining sections discuss the technology transfer thrust and benefits

  7. Training activities at the EPRI NDE Center

    International Nuclear Information System (INIS)

    Pherigo, G.

    1986-01-01

    The Electric Power Research Institute (EPRI), through its Nondestructive Examination (NDE) Center in Charlotte, North Carolina, has identified two specific categories of NDE training to best serve the industry's need for enhanced personnel qualification programs. These categories include in-service inspection (ISI) training and technical skills training. The ISI training provides operator training in new NDE technology areas that are ready for field application. The technical skills training is developed as part of a long-range plan to support all basic NDE methods typical to the electric power industry. The need for specific training and better documentation of NDE personnel qualifications is becoming more evident. ASME Section XI requirements for the qualification and certification of visual examiners and the recognition by the US Nuclear Regulatory Commission (NRC) of the importance of the ultrasonic (UT) operator in finding intergranular stress corrosion cracking (IGSCC) are two of the major issues being addressed by the training task of the EPRI NDE Center. The overall intent of the center's training is to meet the most critical utility needs with quality training that can be used by the trainee's employer as a part of their certification of that individual. To do this, the center has organized and activated a carefully maintained documentation and records systems built around the continuing education unit

  8. Operation of the EPRI nondestructive evaluation center: 1985 annual report

    International Nuclear Information System (INIS)

    Nemzek, T.A.; Stone, R.M.; Ammirato, F.V.; Becker, F.L.; Krzywosz, K.; Pherigo, G.L.; Wilson, G.H. III.

    1986-08-01

    This report describes the Electric Power Research Institute (EPRI) Nuclear Division funded nondestructive evaluation (NDE) project activities carried out at the EPRI NDE Center in 1985. The continuing objective of the Center is transfer of research and development results funded by EPRI and other related projects to useful field application. This is being accomplished by qualification and refinement of equipment and techniques, training under realistic conditions, and encouragement of greater involvement of the academic community in NDE education. Significant assistance has been provided to the nuclear utility industry under this project in the form of improved, field-ready equipment and procedures; critically needed assessments of inspection method capability; demonstrations of effectiveness of examination methods; rapid response for critical, short-term problems; and training for specific utility industry needs. This effort has specifically addressed steam generator, piping, steam turbine, and heavy section inspection problems

  9. NDE training activities at the EPRI NDE Center

    International Nuclear Information System (INIS)

    Pherigo, G.L.

    1988-01-01

    The three principal categories of training activity at the EPRI NDE Center are in-service inspection (ISI) training, technical skills training, and human resource development. The ISI training category, which addresses recently developed NDE technologies that are ready for field application, is divided into two areas. One area provides ongoing training and qualification service to boiling water reactor (BWR) utilities in accordance with the Coordination Plan for NRC/EPRI/BWROG Training and Qualification Activities of NDE Personnel. This plan specifically addresses the detection and sizing of intergranular stress corrosion cracking (IGSCC). The second area includes training activities for other recently developed NDE technologies. Courses in this area include weld overlay examination and advanced eddy current data analysis. The technical skills training is developed and offered to support the basic NDE technology needs of the utilities, with emphasis on utility applications. These programs are provided in direct response to generic or specific needs identified by the utility NDE community. The human resource development activities are focused on long-term utility needs through awareness programs for high schools, technical schools, and universities. These training programs are described

  10. EDF/EPRI collaborative program on operator reliability experiments

    International Nuclear Information System (INIS)

    Villemeur, A.; Meslin, T.; Mosneron, F.; Worledge, D.H.; Joksimovich, V.; Spurgin, A.J.

    1988-01-01

    Electricite de France (EDF) and Electric Power Research Institute (EPRI) have been involved in human reliability studies over the last few years, in the context of improvements in human reliability assessment (HRA) methodologies, and have been following a systematic process since 1982 which consists of addressing the following five ingredients: - First, classify human interactions into a limited number of classes. - Second, introduce an acceptable framework to organize the application of HRA to PRA studies. - Third, select approach(es) to quantification. - Fourth, test promising models. - Fifth, establish an appropriate data base for tested model(s) with regard to specific applications. EPRI has just recently completed Phase I of the fourth topic. This primarily focused on testing the fundamental hypotheses behing the human cognitive reliability (HCR) correlation, using power plant simulators. EDF has been carrying out simulator studies since 1980, both for man-machine interface validation and HRA data collection. This background of experience provided a stepping stone for the EPRI project. On the other hand, before 1986, EDF had mainly been concentrating on getting qualitative insights from the tests and lacked experience in quantitative analysis and modeling, while EPRI had made advances in this latter area. Before the EPRI Operator Reliability Experiments (ORE) project was initiated, it was abundantly clear to EPRI and EDF that cooperation between the two could be useful and that both parties could gain from the cooperation

  11. Piping inspection activities at the EPRI NDE Center

    International Nuclear Information System (INIS)

    Ammirato, F.V.

    1988-01-01

    Intergranular stress corrosion cracking (IGSCC) in the primary system of boiling water reactors (BWRs) has been a major reliability issue in recent years. BWR pipe cracking was first reported in 1974 with a low percentage of only small-diameter lines affected. However, with increased plant operating time, the number of reported cracking incidents has risen significantly and in 1982 and 1983 included the large-diameter recirculation lines. With the advent of cracking in large-diameter piping, innovative repair remedies were developed, such as weld overlay for repair (WOR). Although these remedies are effective in extending the service life of piping, they also present challenging NDE problems. The EPRI program for improving piping examination has aimed at systematically resolving the difficulties by optimizing techniques and procedures as well as by developing field-qualified automated examination equipment. The EPRI NDE Center's role has been the evaluation and transfer of the technology necessary to address the current piping examination problems of the nuclear utility industry. These activities normally include the following: technology assessment and improvement; validation through demonstrations and field trials; technology transfer reports, workshops, training, and qualification testing; and acquisition of relevant samples. The activities of the NDE Center are discussed

  12. EPRI epidemiology

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    A fight is brewing within the electric power community over the fate of a proposed $5 to $8 million epidemiological study of the effects of radiation on US nuclear plant workers. Several industry experts, claiming the project would merely lead to confusion by producing no clear results, are trying to prevent the Electric Power Research Institute (EPRI) from funding what would be the largest ever occupational study of this kind, covering perhaps as many as 500,000 workers. Ralph Lapp, a well-known radiation physicist, says that EPRI is facing unprecedented technical dissent from within. He claims there is already plenty of evidence that nuclear utilities are among the safest places to work, at least in terms of cancer risk, and that the proposed EPRI study would raise new concerns without yielding any answers

  13. Experience gained in running the EPRI MMS code with an in-house simulation language

    International Nuclear Information System (INIS)

    Weber, D.S.

    1987-01-01

    The EPRI Modular Modeling System (MMS) code represents a collection of component models and a steam/water properties package. This code has undergone extensive verification and validation testing. Currently, the code requires a commercially available simulation language to run. The Philadelphia Electric Company (PECO) has been modeling power plant systems for over the past sixteen years. As a result, an extensive number of models have been developed. In addition, an extensive amount of experience has been developed and gained using an in-house simulation language. The objective of this study was to explore the possibility of developing an MMS pre-processor which would allow the use of the MMS package with other simulation languages such as the PECO in-house simulation language

  14. Sustained qualification process for full scope nuclear power plant simulators

    International Nuclear Information System (INIS)

    Pirson, J.; Stubbe, E.; Vanhoenacker, L.

    1994-01-01

    In the past decade, simulator training for all nuclear power plant operators has evolved into a vital requirement. To assure a correct training, the simulator qualification process is an important issue not only for the initial validation but also following major simulator updates, which are necessary during the lifetime of the simulator. In order to avoid degradation of the simulator validated software, the modifications have to be introduced according to a rigorous methodology and a practical requalification process has to be applied. Such methodology has to be enforced at every phase of the simulator construction or updating process from plant data package constitution, over simulator software development to simulator response qualification. The initial qualification and requalification process is based on the 3 levels identified by the ANSI/ANS 3-5 standard for steady-state, operational transients and accident conditions. For the initial certification of the full scope simulators in Belgium, a practical qualification methodology has been applied, which has been adapted into a set of non regression tests for the requalification after major simulator updates. (orig.) (4 refs., 3 figs.)

  15. Qualification issues: the rest of the iceberg

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Luna, R.E.

    1978-01-01

    Reactor safety has been a primary concern since the beginning of commercial power reactor development. But only since the IEEE became actively involved (circa-1970), through IEEE-323-1971 and its predecessor drafts, has the qualification of selected Class 1 equipment been formalized and intensified. Currently EPRI and the USNRC are funding significant qualification research programs. However, these current research topics address only a few of the issues and there are more to come. A review of recent achievements and a discussion of some issues still to be encountered are presented

  16. Qualification of NDE personnel in the nuclear industry

    International Nuclear Information System (INIS)

    Epps, T.N.

    1984-01-01

    There has been evidence of ineffective programs for certifying nondestructive examination (NDE) personnel who conduct periodic inservice examinations in nuclear power plants under ASME Section XI Code requirements. This was brought to the attention of a group from the electric utility industry, the Electric Power Research Institute (EPRI), some NDE consultants and representatives from the American Society of Mechanical Engineers (ASME) by the Nuclear Regulatory Commission (NRC) in a May, 1982 meeting in Bethesda, Maryland. One problem pointed out by the NRC was the lack of a clear definition of qualification requirements for certification of NDE personnel who conduct ASME Section XI Inservice Inspection work in nuclear power plants. The NRC requested that the nuclear industry resolve this problem by formulating definitive qualification requirements for personnel certification that could be made an industry requirement. In June, 1982 the EPRI NDE Subcommittee held a general meeting for utility representatives to discuss the results of the May, 1982 meeting to develop a plan for industry response to the issue. The consensus was that an Ad Hoc Committee of utility representatives be convened to develop a document outlining qualification requirements for vertification of NDE personnel. The Ad Hoc Committee was formally convened on September 29, 1982

  17. EPRI perspective of owner groups

    International Nuclear Information System (INIS)

    Dau, G.J.

    1988-01-01

    A survey was conducted to evaluate the utilities' perspective of the success of efforts of the Electric Power Research Institute (EPRI) and owner groups for the development and implementation of advanced technology. The source of the advanced technology was the result of a joint effort between EPRI and two utility owner groups. The former performs generic research and development (R and D) on behalf of its members drawn from the US electric utility industry. Owner groups are short-term associations of a group of utilities, all confronted with the same problem. Management implications for both EPRI and the utilities are drawn from the results and are summarized. They include recognition that EPRI's reputation for objectivity is an important asset that must be protected. Other implications include assessments of the merits and options for building better utility/NRC relations and strengthening the utility/EPRI relationship. Addressing the implications does not hinge on any major new development. Rather, it depends on EPRI and utility management making the commitment to support efforts to increase the intensity of communication on the baseline program. The resources needed are mainly provision of adequate staff time and attendant travel expenses

  18. Pressurized thermal shock program sponsored by EPRI

    International Nuclear Information System (INIS)

    Stahlkopf, K.E.

    1983-01-01

    The potential for long term neutron embrittlement of reactor vessels has been recognized for a number of years. Reactor vessel thermal shock is not a new concern, but with a growing number of plants approaching their mid-lives, it is a concern that must be understood and dealt with. Recent attention has focused on the performance of vessels during overcooling transients. This concern was designated as Unresolved Safety Issue A-49 by the Nuclear Regulatory Commission in December 1981. The USNRC staff has identified eight overcooling events of concern in U.S. PWRs. The concern is currently limited to Pressurized Water Reactors. The Electric Power Research Institute (EPRI) has supported research on reactor vessel integrity for a number of years and has supported an extensive effort on reactor vessel pressurized thermal shock (PTS) over the last three years. In addition, EPRI has developed a linked set of computer codes to simulate the pressurized thermal shock transients and assess the integrity of the nuclear reactor vessels for various overcooling transients. This paper focuses on the integrated analysis approach being used by EPRI in performing such analysis. (orig.)

  19. The utilization of VUJE specialists non-destructive testing qualification at international cooperation with company TECNATOM

    International Nuclear Information System (INIS)

    Kuna, M.

    2006-01-01

    The utilization of VUJE specialists non-destructive testing qualification at cooperation with company TECNATOM. The obtain of QDA qualification for ET examination for possibility of qualified evaluation in the foreign NPP (USA, Brazil). The acquired practical experiences by evaluation of ET data from NPP Angra Brazil and Waltz Mill USA. The obtain of SNT-TC-1A and EPRI qualification for the UT evaluation of penetration tube welds measurements. The practical experience during the measurement on NPP Shearon Harris (Author)

  20. EPRI compact analyzer: A compact, interactive and color-graphics based simulator for power plant analysis

    International Nuclear Information System (INIS)

    Ipakchi, A.; Khadem, M.; Chen, H.; Colley, R.W.

    1986-01-01

    This paper presents the results of an EPRI sponsored project (RP2395-2) for design and development of an interactive, and color graphics based simulator for power plant analysis. The system is called Compact Analyzer and can be applied to engineering and training applications in the utility industry. The Compact Analyzer's software and system design are described. Results of two demonstration system for a nuclear plant, and a fossil plant are presented, and the applications of the Compact Analyzer to operating procedures evaluation are discussed

  1. Review of EPRI Nuclear Human Factors Program

    International Nuclear Information System (INIS)

    Hanes, L.F.; O'Brien, J.F.

    1996-01-01

    The Electric Power Research Institute (EPRI) Human Factors Program, which is part of the EPRI Nuclear Power Group, was established in 1975. Over the years, the Program has changed emphasis based on the shifting priorities and needs of the commercial nuclear power industry. The Program has produced many important products that provide significant safety and economic benefits for EPRI member utilities. This presentation will provide a brief history of the Program and products. Current projects and products that have been released recently will be mentioned

  2. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...

  3. EPRI waste processing projects

    International Nuclear Information System (INIS)

    Shaw, R.A.

    1987-01-01

    The Electric Power Research Institute (EPRI) manages research for its sponsoring electric utilities in the United States. Research in the area of low level radioactive waste (LLRW) from light water reactors focuses primarily on waste processing within the nuclear power plants, monitoring of the waste packages, and assessments of disposal technologies. Accompanying these areas and complimentary to them is the determination and evaluation of the sources of nuclear power plants radioactive waste. This paper focuses on source characterization of nuclear power plant waste, LLRW processing within nuclear power plants, and the monitoring of these wastes. EPRI's work in waste disposal technology is described in another paper in this proceeding by the same author. 1 reference, 5 figures

  4. 14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...

  5. EPRI releases strategic plan for hydroelectric R and D

    International Nuclear Information System (INIS)

    Fickett, A.P.

    1993-01-01

    The Electric Power Research Institute has published a report identifying important research needs and issues in the hydroelectric industry. The report is based on results from a survey of representatives of the 1992 North American hydroelectric community. EPRI conducted the survey to expand upon recommendations of the North American Hydroelectric R ampersand D Forum and to develop EPRI's agenda. The report, an EPRI Strategy for Hydropower Research and Development: Rethinking our Water Resource Management Strategies, outlines an agenda for improving the use of water resources and expanding hydroelectric production at existing dams. It also proposes a new, expanded EPRI strategy within the context of the future energy needs of the US and the North American hydro research agenda

  6. EPRI's pumped storage planning and evaluation guide

    International Nuclear Information System (INIS)

    Chen, H.H.

    1991-01-01

    EPRI's Hydropower Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: evaluate pumped-storage operation in a utility system, establish site development concept, estimate capital cost, and conduct economic analysis. The Guide provides a floppy diskette containing a production costing model simulating the chronologic operation of pumped storage in a generating system. It provides a series of estimating curves for the preparation of capital cost estimates. The paper presents how the Guide was organized and prepared, and highlights its contents

  7. EPRI/DOE nuclear plant life extension overview

    International Nuclear Information System (INIS)

    Carey, J.J.; Lapides, M.E.; Harrison, D.; Ducharme, A.

    1987-01-01

    Recognizing the major investment in current U.S. nuclear capacity and the excellent prospects that these units have a useful life substantially in excess of their 40 year license term, EPRI and DOE have jointly undertaken a comprehensive, multiyear, nuclear plant life extension program. The program, which has its antecedents in EPRI studies of 1978-9, aims to support U.S. utilities, first in verifying the requirements of extended operation and then in implementing a plan for achieving extended service and license renewal. The effort, begun in 1985, has already yielded numerous benefits and is expected to further aid in improving near-term performance of nuclear units. A utility LWR Plant Life Extension Committee has been established to provide overview and guidance to the DOE/EPRI research and development activities and also to develop and integrate utility responses to licensing and codes and standards issues. Pilot study projects, performed by Virginia Power and Northern States Power, were the initial EPRI/DOE focus. This base has gradually expanded to incorporate other utilities and generating units, as well as a broad base of technology support. The latter includes: a) economic and financial analysis methods applicable at the unit, region and national level, b) long-term materials deterioration analysis and sampling, c) component life prediction methods and d) refurbishment and repair evaluations. This paper presents the history and status of the overall EPRI/DOE program

  8. Operation of the EPRI Nondestructive Evaluation Center

    International Nuclear Information System (INIS)

    Stone, R.M.; Ammirato, F.V.; Becker, F.L.

    1989-11-01

    This report describes the Electric Power Research Institute (EPRI) funded nondestructive evaluation (NDE) and life assessment project activities carried out at the EPRI NDE Center in 1988. The primary support for this program is provided through contract RP 1570-2 with the EPRI Nuclear Division. Supplementary funding is provided by other contracts with the EPRI Nuclear, Coal Combustion, and Electrical Systems Divisions. The major objective of this program is to provide improved and field-qualified NDE equipment, procedures, and personnel training to the electric utility industry. A second program objective involves the validation, provision, and maintenance of life assessment codes for selected plant components. Significant assistance has been provided to the utility industry under this project in the form of improved, field-ready equipment and procedures; critically needed assessments of inspection method capability; demonstrations of effectiveness of examination methods; rapid response for critical, short-term problems; assistance with selected life assessment computer codes; and training for specific utility industry needs. These efforts have specifically involved heat exchanger, piping, steam turbine, generator, and heavy section problems. Certain components of both nuclear and fossil plants have been addressed. 56 refs., 48 figs., 13 tabs

  9. DOE-EPRI On-Line Monitoring Implementation Guidelines

    International Nuclear Information System (INIS)

    E. Davis, R. Bickford

    2003-01-01

    Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasibility of on-line monitoring at several participating nuclear plants. The results have been very encouraging, and substantial progress is anticipated in the coming years

  10. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  11. EPRI research on soil-structure interaction

    International Nuclear Information System (INIS)

    Tang, H.T.

    1986-01-01

    The paper briefly discusses the background of soil-structure interaction research and identifies the nuclear industry's need for a realistic, experimentally qualified soil-structure interaction analysis methodology for nuclear power plant design to reduce excessive conservatism and stabilize the licensing process. EPRI research and joint research efforts between EPRI and Niagara Mohawk Power Corporation, Taiwan Power Company, and the Japanese Century Research Institute for Electric Power Industry are outlined. As a result of these and other research efforts, improvement in soil-structure interactions methodologies is being realized

  12. Report of the 1992 EPRI Fusion Panel

    International Nuclear Information System (INIS)

    Hirsch, R.L.; Culler, F.; Hingorani, N.G.; Taylor, J.J.; Schneider, T.R.; Spencer, D.F.

    1992-01-01

    Fusion is one of only a few very long-term (multi-century) options for the central station generation of electric power. As such, an informed awareness of the status of fusion development is important to the electric utilities and to EPRI. In its recent open-quotes National Energy Strategyclose quotes report, the U.S. Department of Energy states that it intends to carry out a goal-oriented fusion development strategy, with the aim of operating a demonstration plant by about 2025 and a commercial power plant by about 2040. Around the time the DOE was preparing this strategy, budget pressures caused them to narrow their civilian development program to the tokamak magnetic confinement concept. A significant research program on inertial confinement fusion is maintained primarily for defense purposes but with possible civilian application also. Many in the utility and engineering communities have raised questions about the suitability of both the tokamak and inertial confinement as commercial power sources, while recognizing their unquestioned pre-eminence in achieving fusion plasma conditions. These questions, coupled with a possible interest in becoming more involved in the development of fusion power, led EPRI senior management to establish a panel of senior executives to consider a wide range of conceivable fusion reactor opportunities. The purposes of the 1992 EPRI Fusion Study were as follows: 1. To evaluate a wide range of fusion concepts from a utility desirability standpoint. 2. To enhance EPRI's perspective in fusion. 3. To provide guidance to DOE on fusion concept characteristics important to utilities. 4. To provide a basis for re-establishing DOE-EPRI communication and cooperation in fusion

  13. Material shielding of power frequency magnetic fields: Research and testing results from the EPRI Power Delivery Center-Lenox. Final report

    International Nuclear Information System (INIS)

    Anderson, C.B.

    1998-06-01

    Extensive investigations of a variety of material shielding methods have been performed at the EPRI Power Delivery Center--Lenox, Massachusetts. This work is part of a larger shielding investigation being done for EPRI by Electric Research and Management, Inc. (ERM) as part of the Magnetic Field Management Target in the EPRI Environment Group. Part of this work, involving cylinders of material, is to be included in a shielding handbook being prepared by ERM. Material shielding tests, not included in the handbook, as well as additional material shielding research, including testing, analyses, and computer simulations performed at the EPRI Power Delivery Center--Lenox are documented here. One of the major complications of using materials to shield magnetic fields is the mathematical complexity of the phenomenon involved. The result is that analytical solutions exist only for a very small number of simple geometries such as spheres, infinitely long cylinders, and infinite sheets. In practice, the materials typically come in the form of sheets. At present, there are no analytical methods for directly determining the shielding effectiveness of finite sheets of material, however, EPRI is sponsoring work in this area. There are some methods based on conformal mapping which can provide a solution for simple two-dimensional sheets. While such methods are useful in gaining insight into the mechanisms of shielding, they are not realistic enough to provide accurate shielding estimates. Empirical techniques are still required to determine the shielding effectiveness of material sheets. The material shielding tests and computer simulations are described in the report. The results of these tests and simulations have been used to develop a number of material shielding design rules for use in practical applications

  14. EPRI instruments reach commercial market

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Electric Power Research Institute has developed instruments capable of verifying time responses of power plant pressure sensors and temperature sensors. A patent is pending on the pressure-sensor device, and the temperature-sensor device is already commercially available. The devices, EPRI's first hardware products to be marketed, are the result of research to find technological solutions to the problems of knowing the time period when temperature and pressure changes occur in light water reactors. The hydraulic pressure-sensor device is a portable unit that can conveniently test equipment in place. Utilities can obtain detailed information from EPRI's project report to construct their own. The loop current step response (LCSR), measuring resistance temperature, is also a compact system suitable for in-plant testing

  15. Contribution of the ultrasonic simulation to the testing methods qualification process

    International Nuclear Information System (INIS)

    Le Ber, L.; Calmon, P.; Abittan, E.

    2001-01-01

    The CEA and EDF have started a study concerning the simulation interest in the qualification of nuclear components control by ultrasonic methods. In this framework, the simulation tools of the CEA, as CIVA, have been tested on real control. The method and the results obtained on some examples are presented. (A.L.B.)

  16. 14 CFR 121.412 - Qualifications: Flight instructors (airplane) and flight instructors (simulator).

    Science.gov (United States)

    2010-01-01

    ... (airplane) and flight instructors (simulator). 121.412 Section 121.412 Aeronautics and Space FEDERAL... OPERATIONS Training Program § 121.412 Qualifications: Flight instructors (airplane) and flight instructors (simulator). (a) For the purposes of this section and § 121.414: (1) A flight instructor (airplane) is a...

  17. EPRI activities in support of new nuclear plant deployment

    International Nuclear Information System (INIS)

    Mulford, T.

    2007-01-01

    This paper describes the challenges to new plant deployment in the United States and discusses the role of the Electric Power Research Institute (EPRI) in efforts to address these challenges. These technical challenges include completing remaining design work, licensing review, and standardization required to ensure that new LWRs are a competitive near-term option. The costs for construction, licensing, and operation of new nuclear plants are uncertain and this uncertainty, along with concerns about construction schedule form a financial challenge to investment. Because the new process for licensing nuclear power plants in the United States has not been fully demonstrated, regulatory concerns also serve as a challenge to near-term commitments to build new nuclear power plants. EPRI is working in concert with utilities and vendors to upgrade certified LWR designs and obtain certification of new LWR designs. Specific technical areas being addressed by EPRI projects include updating the Utility Requirements Document (URD), seismic resolution, radiation protection, radioactive waste management, the development of utility planning tools, and staff optimization. EPRI's key on-going project, the New Plant Deployment Program Model (NPDPM), is designed to help prospective and actual new nuclear plant managers and staff to identify schedule and resource requirements from the point of the decision to build a plant through to the start of commercial operation. This model will describe and organize key activities and assess schedule, activity duration, logic relationships and critical path analysis. The new plant licensing and deployment process is a five to ten year activity representing a significant financial investment that requires coordination with federal and state regulators, designers, architect engineers, and numerous other contributing organizations. Planning is crucial to schedule and budget control. EPRI has also supported projects to quantify the environmental

  18. EPRI-USDOE COOPERATIVE AGREEMENT: COFIRING BIOMASS WITH COAL

    Energy Technology Data Exchange (ETDEWEB)

    David A. Tillman

    2001-09-01

    The entire Electric Power Research Institute (EPRI) cofiring program has been in existence of some 9 years. This report presents a summary of the major elements of that program, focusing upon the following questions: (1) In pursuit of increased use of renewable energy in the US economy, why was electricity generation considered the most promising target, and why was cofiring pursued as the most effective near-term technology to use in broadening the use of biomass within the electricity generating arena? (2) What were the unique accomplishments of EPRI before the development of the Cooperative Agreement, which made developing the partnership with EPRI a highly cost-effective approach for USDOE? (3) What were the key accomplishments of the Cooperative Agreement in the development and execution of test and demonstration programs-accomplishments which significantly furthered the process of commercializing cofiring?

  19. Proceedings of the Third EPRI Phased Array Ultrasound Seminar

    International Nuclear Information System (INIS)

    2003-01-01

    Phased array technology for ultrasonic examination is providing innovative solutions for nuclear in-service examination applications. EPRI has been a prime mover in the development and deployment of phased array ultrasound applications in the domestic nuclear market over the past decade. As part of this strategic effort, EPRI has hosted a series of seminars on phased array technology and its applications

  20. Computerized materials data at EPRI

    International Nuclear Information System (INIS)

    Gilman, J.

    1985-01-01

    In this paper an overview of the development of materials database systems is given as well as brief descriptions of several databases built by the Electric Power Research Institute (EPRI) for the Nuclear Power Industry. A number of important lessons about databases have been learned by EPRI and will be discussed. A schematic outline of the major steps in developing a database is given in figure 6. For materials properties in general, the process begins with raw data from laboratory tests which are recorded by a variety of media which may or may not be machine-readable. After compilation, which often requires manual transcription, checking, and reformatting, the assembled data are loaded into a database. Associated with the database is computer software that allows for sorting, searching, etc., and is called the database management system. In addition, other software can provide statistical analysis and graphical displays

  1. EPRI spearheads generic PM recommendations for infrastructure equipment

    International Nuclear Information System (INIS)

    Worledge, David H.; Hinchcliffe, Glenn R.; Benak, Mark S.; Bridges, Martin

    2007-01-01

    All companies have at their core a vast amount of similar equipment that would benefit from solid preventive maintenance (PM) recommendations that are generic and easily adapted to meet operational conditions. The re-emergence of PM optimization methods like Reliability Centered Maintenance, further illustrates that companies in all industries recognize the positive influence that a well-focused maintenance program has on the corporate bottom line. The Electric Power Research Institute (EPRI) has long been a leader in providing universally adaptable maintenance solutions to meet the evolving needs of its membership. Nearly ten years ago, EPRI began developing the PM Basis Database, a one-of-a-kind repository of PM recommendations for basic infrastructure components (such as pumps, motors, valves, compressors), derived from equipment experts. EPRI has now made available this comprehensive body of knowledge to all industries. This paper will explore the origins and structure of the database, how these generic PM recommendations benefit every industry, and how they may be obtained. (author)

  2. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    Energy Technology Data Exchange (ETDEWEB)

    McGowin, C.; DeMeo, E. [Electric Power Research Institute, Palo Alto, CA (United States); Calvert, S. [Dept. of Energy, Washington, DC (United States)] [and others

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  3. EPRI-USDOE COOPERATIVE AGREEMENT: COFIRING BIOMASS WITH COAL; FINAL

    International Nuclear Information System (INIS)

    David A. Tillman

    2001-01-01

    The entire Electric Power Research Institute (EPRI) cofiring program has been in existence of some 9 years. This report presents a summary of the major elements of that program, focusing upon the following questions: (1) In pursuit of increased use of renewable energy in the US economy, why was electricity generation considered the most promising target, and why was cofiring pursued as the most effective near-term technology to use in broadening the use of biomass within the electricity generating arena? (2) What were the unique accomplishments of EPRI before the development of the Cooperative Agreement, which made developing the partnership with EPRI a highly cost-effective approach for USDOE? (3) What were the key accomplishments of the Cooperative Agreement in the development and execution of test and demonstration programs-accomplishments which significantly furthered the process of commercializing cofiring?

  4. EPRI'S low-level waste management R ampersand D program

    International Nuclear Information System (INIS)

    Hornibrook, C.

    1997-01-01

    The immediate challenges facing every organization today are to improve its productivity and increase customer satisfaction. The Electric Power Research Institute (EPRI) responded to this challenge by broadening the scope of its low-level waste (LLW) management program. EPRI offered utilities on-site assistance in evaluating and optimizing their liquid- and solid-waste management programs. The goal is to identify open-quotes cheaper, better, and easierclose quotes solutions, which are documented in a series of reports. These provide step-by-step evaluation processes and straightforward implementation methods. Utility professionals are provided with the necessary technical information and justification for informed waste management decisions. The resulting average annual savings is consistently in excess of $700,000 per facility. The program continues to grow and serves as a model for a number of existing and emerging EPRI programs

  5. EPRI depletion benchmark calculations using PARAGON

    International Nuclear Information System (INIS)

    Kucukboyaci, Vefa N.

    2015-01-01

    Highlights: • PARAGON depletion calculations are benchmarked against the EPRI reactivity decrement experiments. • Benchmarks cover a wide range of enrichments, burnups, cooling times, and burnable absorbers, and different depletion and storage conditions. • Results from PARAGON-SCALE scheme are more conservative relative to the benchmark data. • ENDF/B-VII based data reduces the excess conservatism and brings the predictions closer to benchmark reactivity decrement values. - Abstract: In order to conservatively apply burnup credit in spent fuel pool criticality analyses, code validation for both fresh and used fuel is required. Fresh fuel validation is typically done by modeling experiments from the “International Handbook.” A depletion validation can determine a bias and bias uncertainty for the worth of the isotopes not found in the fresh fuel critical experiments. Westinghouse’s burnup credit methodology uses PARAGON™ (Westinghouse 2-D lattice physics code) and its 70-group cross-section library, which have been benchmarked, qualified, and licensed both as a standalone transport code and as a nuclear data source for core design simulations. A bias and bias uncertainty for the worth of depletion isotopes, however, are not available for PARAGON. Instead, the 5% decrement approach for depletion uncertainty is used, as set forth in the Kopp memo. Recently, EPRI developed a set of benchmarks based on a large set of power distribution measurements to ascertain reactivity biases. The depletion reactivity has been used to create 11 benchmark cases for 10, 20, 30, 40, 50, and 60 GWd/MTU and 3 cooling times 100 h, 5 years, and 15 years. These benchmark cases are analyzed with PARAGON and the SCALE package and sensitivity studies are performed using different cross-section libraries based on ENDF/B-VI.3 and ENDF/B-VII data to assess that the 5% decrement approach is conservative for determining depletion uncertainty

  6. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  7. EPRI research on accident management

    International Nuclear Information System (INIS)

    Oehlberg, R.N.; Chao, J.

    1991-01-01

    The paper discusses Nuclear Regulatory Commission (NRC) efforts regarding severe reactor accident management and the Nuclear Management and Resources Council (NUMAEX), activities. (EPRI) Electric Power Research Institute accident management program consists of the two products just mentioned plus one related to severe accident plant status information and the MAAP 4.0 computer code. These are briefly discussed

  8. SAI/EPRI Albedo Information Library

    International Nuclear Information System (INIS)

    Simmons, G.L.

    1979-03-01

    The SAI/EPRI Albedo Information Library (SAIL) is described. This description included the techniques used to develop the data and comparisons with albedo data. Albedo data are presented for Type 04 Concrete and Low Carbon Steel, the most common materials encountered in radiation streaming analysis. Applications of the SAIL data are presented and compared with experimental results

  9. Contribution of the ultrasonic simulation to the testing methods qualification process; Contribution de la modelisation ultrasonore au processus de qualification des methodes de controle

    Energy Technology Data Exchange (ETDEWEB)

    Le Ber, L.; Calmon, P. [CEA/Saclay, STA, 91 - Gif-sur-Yvette (France); Abittan, E. [Electricite de France (EDF-GDL), 93 - Saint-Denis (France)

    2001-07-01

    The CEA and EDF have started a study concerning the simulation interest in the qualification of nuclear components control by ultrasonic methods. In this framework, the simulation tools of the CEA, as CIVA, have been tested on real control. The method and the results obtained on some examples are presented. (A.L.B.)

  10. Operator support systems activities at EPRI

    International Nuclear Information System (INIS)

    Naser, J.A.

    1993-01-01

    The integration of operator support systems supports the nuclear power plant goals of improved availability and reliability, enhanced safety, reduced operations and maintenance costs, and improved productivity. Two major aspects which supports this integration are discussed in this paper. The first is the plant communications and computing architecture which provides the infrastructure that allows the integration to exist in a easy to implement manner. Open systems concepts are utilized to guarantee interoperability of systems and interchangeability of equipment. The second is the EPRI Plant-Window System which supplies the interface between the human and the plant systems. It implements common human-machine interfaces amongst systems and supports the implementation of diagnostic and decision aids. Work in both of these areas is being done as part of the EPRI Instrumentation and Control Upgrade Program. A number of operator support systems have been developed and are in various stages of implementation, testing and utilization. Two of these, the RWCU and the EOPTS, are described here. 5 refs, 14 figs

  11. Industry upheaval drives changes at EPRI

    International Nuclear Information System (INIS)

    Zink, J.C.

    1996-01-01

    This article describes how the Electric Power Research Institute (EPRI) is rethinking and modifying its program and business relationships with its members to reflect the significant changes occurring in the utility business. They are in the midst of changes as profound as any the (electric utility) industry has ever seen, according to Kurt Yeager, EPRI's new president and CEO. The renewed availability of natural gas for power generation, along with the development of more efficient gas turbines, have been important factors. The ability to better manage the delivery system has contributed to the arguments in favor of increased competition, although the application of the management tools, such as flexible ac transmission systems (FACTS), is not coming as quickly as many had expected. And new digitally controlled electrotechnologies have made electricity a growth business again, creating a third wave of growth driven by technologies that allow more precise and efficient control of industrial processes

  12. EPRI-LATTICE: a multigroup neutron transport code for light water reactor lattice physics calculations

    International Nuclear Information System (INIS)

    Jones, D.B.

    1986-01-01

    EPRI-LATTICE is a multigroup neutron transport computer code for the analysis of light water reactor fuel assemblies. It can solve the two-dimensional neutron transport problem by two distinct methods: (a) the method of collision probabilities and (b) the method of discrete ordinates. The code was developed by S. Levy Inc. as an account of work sponsored by the Electric Power Research Institute (EPRI). The collision probabilities calculation in EPRI-LATTICE (L-CP) is based on the same methodology that exists in the lattice codes CPM-2 and EPRI-CPM. Certain extensions have been made to the data representations of the CPM programs to improve the overall accuracy of the calculation. The important extensions include unique representations of scattering matrices and fission fractions (chi) for each composition in the problem. A new capability specifically developed for the EPRI-LATTICE code is a discrete ordinates methodology. The discrete ordinates calculation in EPRI-LATTICE (L-SN) is based on the discrete S/sub n/ methodology that exists in the TWODANT program. In contrast to TWODANT, which utilizes synthetic diffusion acceleration and supports multiple geometries, only the transport equations are solved by L-SN and only the data representations for the two-dimensional geometry are treated

  13. EPRI root cause advisory workstation 'ERCAWS'

    International Nuclear Information System (INIS)

    Singh, A.; Chiu, C.; Hackman, R.B.

    1993-01-01

    EPRI and its contractor FPI International are developing Personal Computer (PC), Microsoft Windows based software to assist power plant engineers and maintenance personnel to diagnose and correct root causes of power plant equipment failures. The EPRI Root Cause Advisory Workstation (ERCAWS) is easy to use and able to handle knowledge bases and diagnostic tools for an unlimited number of equipment types. Knowledge base data is based on power industry experience and root cause analysis from many sources - Utilities, EPRI, US government, FPI, and International sources. The approach used in the knowledge base handling portion of the software is case-study oriented with the engineer selecting the equipment type and symptom identification using a combination of text, photographs, and animation, displaying dynamic physical phenomena involved. Root causes, means for confirmation, and corrective actions are then suggested in a simple, user friendly format. The first knowledge base being released with ERCAWS is the Valve Diagnostic Advisor module; covering six common valve types and some motor operator and air operator items. More modules are under development with Heat Exchanger, Bolt, and Piping modules currently in the beta testing stage. A wide variety of diagnostic tools are easily incorporated into ERCAWS and accessed through the main screen interface. ERCAWS is designed to fulfill the industry need for user-friendly tools to perform power plant equipment failure root cause analysis, and training for engineering, operations and maintenance personnel on how components can fail and how to reduce failure rates or prevent failure from occurring. In addition, ERCAWS serves as a vehicle to capture lessons learned from industry wide experience. (author)

  14. EPRI nuclear power plant decommissioning technology program

    International Nuclear Information System (INIS)

    Kim, Karen S.; Bushart, Sean P.; Naughton, Michael; McGrath, Richard

    2011-01-01

    The Electric Power Research Institute (EPRI) is a non-profit research organization that supports the energy industry. The Nuclear Power Plant Decommissioning Technology Program conducts research and develops technology for the safe and efficient decommissioning of nuclear power plants. (author)

  15. Performance demonstration testing at the EPRI NDE center for intergranular stress corrosion cracking in BWR piping

    International Nuclear Information System (INIS)

    Pherigo, G.

    1986-01-01

    Intergranular stress corrosion cracking (IGSCC) has become a significant concern for the commercial electric utility industry during the past four years. As the IGSCC problem manifested itself, the Nuclear Regulatory Commission (NRC) responded by issuing Inspection and Enforcement (I and E) Bulletin 82-03 which required that ultrasonic inspection procedures be demonstrated on service- removed samples. The ability to reliably detect and discriminate IGSCC was recognized by the industry as a very difficult task, at best. Concurrent with the NRC bulletin, state-of-the-art yet practical techniques for the detection and discrimination of IGSCC had to be developed, demonstrated, and transferred to the field in a relatively short time. With the release of I and E Bulletin 83-02, procedures as well as personnel had to be qualified on service-removed samples. This paper reports how the EPRI Nondestructive Evaluation (NDE) Center developed the necessary technology and a formal training and qualification program to meet these needs on behalf of the industry

  16. Benchmarking and qualification of the ppercase nufreq -ppercase npw code for best estimate prediction of multichannel core stability margins

    International Nuclear Information System (INIS)

    Taleyarkhan, R.P.; McFarlane, A.F.; Lahey, R.T. Jr.; Podowski, M.Z.

    1994-01-01

    The ppercase nufreq - ppercase np (G.C. Park et al. NUREG/CR-3375, 1983; S.J. Peng et al. NUREG/CR-4116, 1984; S.J. Peng et al. Nucl. Sci. Eng. 88 (1988) 404-411) code was modified and set up at Westinghouse, USA, for mixed fuel type multichannel core-wide stability analysis. The resulting code, ppercase nufreq - ppercase npw , allows for variable axial power profiles between channel groups and can handle mixed fuel types.Various models incorporated into ppercase nurfreq - ppercase npw were systematically compared against the Westinghouse channel stability analysis code ppercase mazda -ppercase nf (R. Taleyarkhan et al. J. Heat Transfer 107 (February 1985) 175-181; NUREG/CR2972, 1983), for which the mathematical model was developed in an entirely different manner. Excellent agreement was obtained which verified the thermal-hydraulic modeling and coding aspects. Detailed comparisons were also performed against nuclear-coupled reactor core stability data. All 13 Peach Bottom-2 EOC-2/3 low flow stability tests (L.A. Carmichael and R.O. Neimi, EPRI NP-564, Project 1020-1, 1978; F.B. Woffinden and R.O. Neimi, EPRI, NP 0972, Project 1020-2, 1981) were simulated. A key aspect for code qualification involved the development of a physically based empirical algorithm to correct for the effect of core inlet flow development on subcooled boiling. Various other modeling assumptions were tested and sensitivity studies performed. Good agreement was obtained between ppercase nufreq-npw predictions and data. ((orig.))

  17. EDF feedback on recent EPRI SGOG SG chemical cleanings applications for TSP blockage reduction and heat transfer recover

    International Nuclear Information System (INIS)

    Dijoux, M.; De Bouvier, O.; Mercier, S.; Pages, D.; Bretelle, J.-L.; Leclercq, P.; Mermillod, A.

    2010-01-01

    Between 2007 and 2008, six Steam Generators Chemical Cleanings (SGCC) with the inhibitor free high temperature process were applied on EDF PWR units. The main goal was to reduce the excessive Tube Support Plate blockages observed on several units of the EDF fleet and the consequences on wide range levels and the risk of tube cracks. The heat transfer recovery was the second objective. Despite the correct results obtained, the corrosion impact of the high temperature process on internal metallic surfaces, higher than expected, and the environmental issues led EDF to move to a new cleaning process. The low temperature process developed by EPRI SGOG and applied for many years was selected for the same purpose. Some qualification laboratory tests were performed by Dominion Engineering Inc (DEI) to demonstrate the innocuousness an the efficiency of the process to achieve these goals. The EPRI SGOG process was then applied seven times by Westinghouse on the EDF units Cruas 3, Cruas 2, Belleville 1, Cattenom 1, Cattenom 3, Chinon B3 and Cattenom 4 between 2008 and 2010. All these units operate from the initial start at low AVT pH 25 o C (9,2) in the secondary circuit. Due to copper presence in the deposits to remove, the cleaning sequence 'Copper - Iron - Copper steps' was performed each time. After a short description of the process, including the specific adaptation in France, lessons learned are reported in this paper in the following areas: process monitoring, corrosion, efficiency, liquid and gaseous wastes, chemical pollution during start-up. Based on the 3 first applications in 2008, some modifications of the process were implemented, particularly for the copper step. For the units cleaned, 1100 to 4500 kg of deposits per SG have been removed, including TS sludge lancing. The reduction of TSP blockages was satisfying. The effect on steam pressure improvement and the wide range level is then discussed. The paper concludes on EDF perspectives for soft

  18. Development of Simulator Maintenance Engineer Qualification Program Draft

    International Nuclear Information System (INIS)

    Chung, Kyung Hun

    2010-01-01

    As of 2009, KHNP has currently seven full scope simulators that are used for training of Nuclear Power Plant (NPP) Operators. Well-trained Simulator Maintenance Engineers (SME) are required to support these simulators. These SMEs will maintain and address any issues identified or any changes required for keep up the simulator with their respective plant sites. These issues will be identified as Simulator Discrepancy Reports (DR) or Work Order (WO) by the simulator operation personnel in KHNP. The simulator maintenance is a very complex. The simulator consists of many areas of process and requires experts in software modeling for different processes such as Neutronics, thermohydraulics, Logics, control, Electrical systems and computer systems as well as hardware subjects such as I and C, I/O, computers, etc. All these areas need experts the subject expertise need to be divided among SME's. In other word the SME's need to be trained for different expertise as well as having different level of SME's. KHNP has seen the need to outsource the maintenance work for these complex simulators. To have one company concentrating on this work will have many benefits such as: · Provides proper and well trained experts · Maintains consistent support personnel · Maintains the maintenance history for the simulator · Coordinates and Maintains the knowledge in house · The simulator maintenance will be consistent In order to accomplish the goals, KEPCO RI has recognized that there is a need for a program to adequately train and qualify the SME's. KEPCO RI and GSE, which has provided 6 simulators among 7 NPP simulators in Korea, have jointly developed this Simulator Maintenance Engineer Qualification Program (SMEQP). After issue of this plan, KEPCO RI will maintain and modify as needed periodically to meet the goals and purpose of the plan

  19. Reactor pressure vessel embrittlement management through EPRI-Developed material property databases

    International Nuclear Information System (INIS)

    Rosinski, S.T.; Server, W.L.; Griesbach, T.J.

    1997-01-01

    Uncertainties and variability in U.S. reactor pressure vessel (RPV) material properties have caused the U.S. Nuclear Regulatory Commission (NRC) to request information from all nuclear utilities in order to assess the impact of these data scatter and uncertainties on compliance with existing regulatory criteria. Resolving the vessel material uncertainty issues requires compiling all available data into a single integrated database to develop a better understanding of irradiated material property behavior. EPRI has developed two comprehensive databases for utility implementation to compile and evaluate available material property and surveillance data. RPVDATA is a comprehensive reactor vessel materials database and data management program that combines data from many different sources into one common database. Searches of the data can be easily performed to identify plants with similar materials, sort through measured test results, compare the ''best-estimates'' for reported chemistries with licensing basis values, quantify variability in measured weld qualification and test data, identify relevant surveillance results for characterizing embrittlement trends, and resolve uncertainties in vessel material properties. PREP4 has been developed to assist utilities in evaluating existing unirradiated and irradiated data for plant surveillance materials; PREP4 evaluations can be used to assess the accuracy of new trend curve predictions. In addition, searches of the data can be easily performed to identify available Charpy shift and upper shelf data, review surveillance material chemistry and fabrication information, review general capsule irradiation information, and identify applicable source reference information. In support of utility evaluations to consider thermal annealing as a viable embrittlement management option, EPRI is also developing a database to evaluate material response to thermal annealing. Efforts are underway to develop an irradiation

  20. Proceedings: 2001 ASME/EPRI Radwaste Workshop

    International Nuclear Information System (INIS)

    2001-01-01

    Nuclear utilities continually evaluate methods to improve operations and reduce costs associated with radioactive waste management. The continuing deregulation process has increased the emphasis on this activity. The Annual ASME/EPRI Workshop facilitates this effort by communicating technology and management improvements throughout the industry. This workshop, restricted to utility radwaste professionals, also serves to communicate practical in-plant improvements with the opportunity to discuss them in detail

  1. Proceedings: 2000 ASME/EPRI Radwaste Workshop

    International Nuclear Information System (INIS)

    2001-01-01

    Nuclear utilities are continually evaluating methods to improve operations and reduce costs associated with radioactive waste management. The continuing deregulation process has added increased emphasis to this activity. The Annual ASME/EPRI Workshop facilitates this effort by communicating technological and managerial improvements throughout the industry. This workshop, restricted to utility radwaste professionals, also serves to communicate practical in-plant improvements with the opportunity to discuss them in detail

  2. Role of simulators in licensing and operator qualification in Germany

    International Nuclear Information System (INIS)

    Gronau, D.; Kuhn, A.

    1994-01-01

    According to the Guidelines issued by the licensing authorities, in the Federal Republic of Germany (FRG) comprehensive simulator training is demanded to obtain and preserve technical qualification. Due to the fact that knowledge is imparted most effectively by means of simulators, German utilities even go beyond the minimum times the authorities require for simulator training. To this purpose, the utilities have a special simulator training center available which is equipped with different full-scope simulators so that - depending on plant type and generation - the most appropriate simulator can be used. Plant-specific full-scope simulators are not absolutely necessary when the main emphasis is put on comprehension training. The reason therefor is the high automation degree in real plants, which requires manual interventions not earlier than half an hour after an accident has occurred. As, consequently, no immediate actions have to be practised, essentially more time in simulator training remains to cover unforeseen event sequences which require a high degree of physical and thermal hydraulic understanding. In case of great differences between real plant and full-scope simulator available a plant-specific part-task simulator, which takes all safety-relevant systems into account, may be used successfully, as shown by the experience gained with the Nuclear Functional Trainer (FTN). Furthermore, part-task simulators may relieve full-scope simulators in time so that sufficient capacity for extended simulator training is available. (orig.) (11 figs.)

  3. EPRI steam generator programs

    International Nuclear Information System (INIS)

    Martel, L.J.; Passell, T.O.; Bryant, P.E.C.; Rentler, R.M.

    1977-01-01

    The paper describes the current overall EPRI steam generator program plan and some of the ongoing projects. Because of the recent occurrence of a corrosion phenomenon called ''denting,'' which has affected a number of operating utilities, an expanded program plan is being developed which addresses the broad and urgent needs required to achieve improved steam generator reliability. The goal of improved steam generator reliability will require advances in various technologies and also a management philosophy that encourages conscientious efforts to apply the improved technologies to the design, procurement, and operation of plant systems and components that affect the full life reliability of steam generators

  4. Application of stochastic dynamic simulation to waste form qualification for the HWVP vitrification process

    International Nuclear Information System (INIS)

    Kuhn, W.L.; Westsik, J.H. Jr.

    1989-01-01

    Processing steps during the conversion of high-level nuclear waste into borosilicate glass in the Hanford Waste Vitrification Plant are being simulated on a computer by addressing transient mass balances. The results are being used to address the US Department of Energy's Waste Form Qualification requirements. The simulated addresses discontinuous (batch) operations and perturbations in the transient behavior of the process caused by errors in measurements and control actions. A collection of tests, based on process measurements, is continually checked and used to halt the simulated process when specified conditions are met. An associated set of control actions is then implemented in the simulation. The results for an example simulation are shown. 8 refs

  5. Assessment of EPRI water chemistry guidelines for new nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Kim, K.; Fruzzetti, K.; Garcia, S. [Electric Power Research Inst., Palo Alto, California (United States); Eaker, R. [Richard W. Eaker, LLC, Matthews, North Carolina (United States); Giannelli, J.; Tangen, J. [Finetech, Inc., Parsippany, New Jersey (United States); Gorman, J.; Marks, C. [Dominion Engineering, Inc., Reston, Virginia (United States); Sawochka, S. [NWT Corp., San Jose, California (United States)

    2010-07-01

    Water chemistry control technologies for nuclear power plants have been significantly enhanced over the past few decades to improve material and equipment reliability and fuel performance, and to minimize radionuclide production and transport. Chemistry Guidelines have been developed by the Electric Power Research Institute (EPRI) for current operating plants and have been intermittently revised over the past twenty-five years for the protection of systems and components and for radiation management. As new plants are being designed for improved safety and increased power production, it is important to ensure that the designs consider implementation of industry approved water chemistry controls. In parallel, the industry will need to consider and develop updated water chemistry guidelines as well as plant startup and operational strategies based on the advanced plant designs. In 2010, EPRI began to assess chemistry control strategies at advanced plants, based on the Design Control Documents (DCDs), Combined Construction and Operating License Applications (COLA), and operating experiences (where they exist) against current Water Chemistry Guidelines. Based on this assessment, differences between planned chemistry operations at new plants and the current Guidelines will be identified. This assessment will form the basis of future activities to address these differences. The project will also assess and provide, as feasible, water chemistry guidance for startup and hot functional testing of the new plants. EPRI will initially assess the GE-Hitachi/Toshiba ABWR and the Westinghouse AP1000 designs. EPRI subsequently plans to assess other plant designs such as the AREVA U.S. EPR, Mitsubishi Heavy Industries (MHI) U.S. APWR, and GE-Hitachi (GE-H) ESBWR. This paper discusses the 2010 assessments of the ABWR and AP1000. (author)

  6. Assessment of EPRI water chemistry guidelines for new nuclear power plants

    International Nuclear Information System (INIS)

    Kim, K.; Fruzzetti, K.; Garcia, S.; Eaker, R.; Giannelli, J.; Tangen, J.; Gorman, J.; Marks, C.; Sawochka, S.

    2010-01-01

    Water chemistry control technologies for nuclear power plants have been significantly enhanced over the past few decades to improve material and equipment reliability and fuel performance, and to minimize radionuclide production and transport. Chemistry Guidelines have been developed by the Electric Power Research Institute (EPRI) for current operating plants and have been intermittently revised over the past twenty-five years for the protection of systems and components and for radiation management. As new plants are being designed for improved safety and increased power production, it is important to ensure that the designs consider implementation of industry approved water chemistry controls. In parallel, the industry will need to consider and develop updated water chemistry guidelines as well as plant startup and operational strategies based on the advanced plant designs. In 2010, EPRI began to assess chemistry control strategies at advanced plants, based on the Design Control Documents (DCDs), Combined Construction and Operating License Applications (COLA), and operating experiences (where they exist) against current Water Chemistry Guidelines. Based on this assessment, differences between planned chemistry operations at new plants and the current Guidelines will be identified. This assessment will form the basis of future activities to address these differences. The project will also assess and provide, as feasible, water chemistry guidance for startup and hot functional testing of the new plants. EPRI will initially assess the GE-Hitachi/Toshiba ABWR and the Westinghouse AP1000 designs. EPRI subsequently plans to assess other plant designs such as the AREVA U.S. EPR, Mitsubishi Heavy Industries (MHI) U.S. APWR, and GE-Hitachi (GE-H) ESBWR. This paper discusses the 2010 assessments of the ABWR and AP1000. (author)

  7. EPRI research program NDE techniques for crack initiation of steam turbine rotor

    International Nuclear Information System (INIS)

    Goto, T.; Kimura, J.; Kawamoto, K.; Kadoya, Y.; Viswanathan, R.

    1990-01-01

    EPRI RP 2481-8 aims at the development of nondestructive methods for the life assessment of steam turbine rotor for its crack initiation caused by creep and/or fatigue. As a part of the research project, the demonstration of the state of the art NDE techniques was conducted during June to August of 1988 at EPRI NDE Center, Charlotte, N.C. by Mitsubishi Heavy Industries, Ltd. using four rotors retired after long term service (16-22x10 4 hr). This paper introduces the results of the demonstration

  8. Comparison of EPRI safety valve test data with analytically determined hydraulic results

    International Nuclear Information System (INIS)

    Smith, L.C.; Howe, K.S.

    1983-01-01

    NUREG-0737 (November 1980) and all subsequent U.S. NRC generic follow-up letters require that all operating plant licensees and applicants verify the acceptability of plant specific pressurizer safety valve piping systems for valve operation transients by testing. To aid in this verification process, the Electric Power Research Institute (EPRI) conducted an extensive testing program at the Combustion Engineering Test Facility. Pertinent tests simulating dynamic opening of the safety valves for representative upstream environments were carried out. Different models and sizes of safety valves were tested at the simulated operating conditions. Transducers placed at key points in the system monitored a variety of thermal, hydraulic and structural parameters. From this data, a more complete description of the transient can be made. The EPRI test configuration was analytically modeled using a one-dimensional thermal hydraulic computer program that uses the method of characteristics approach to generate key fluid parameters as a function of space and time. The conservative equations are solved by applying both the implicit and explicit characteristic methods. Unbalanced or wave forces were determined for each straight run of pipe bounded on each side by a turn or elbow. Blowdown forces were included, where appropriate. Several parameters were varied to determine the effects on the pressure, hydraulic forces and timings of events. By comparing these quantities with the experimentally obtained data, an approximate picture of the flow dynamics is arrived at. Two cases in particular are presented. These are the hot and cold loop seal discharge tests made with the Crosby 6M6 spring-loaded safety valve. Included in the paper is a description of the hydraulic code, modeling techniques and assumptions, a comparison of the numerical results with experimental data and a qualitative description of the factors which govern pipe support loading. (orig.)

  9. Nuclear energy electricity technical regulation on the qualification

    International Nuclear Information System (INIS)

    1995-01-01

    It tells the range of application purpose and of the qualification. It describes how to qualify of the class 1 E equipment, which are type test, operating experience, analysis and combined method. Next it deals with qualification procedure, which are specification requirement, requirement of qualification program, type testing, operating experience, analysis and combined qualification, acceptance criteria modification and extension with qualified life, simulated test profiles and document about type test data, operating experience data and extrapolation.

  10. NPP Krsko full scope simulator verification and qualification

    International Nuclear Information System (INIS)

    Krajnc, B.; Glaser, B.; Novsak, M.; Spiler, J.

    1998-01-01

    NPP Krsko (NEK) will, as a part of the Modernization plan, obtain also Krsko Full Scope Simulator (KFSS). Contract has been awarded to CAE Electronics for the design, construction and integration. KFSS will support in real time, the training for the complete range of operation, which can be performed from the main control room and some selected plant areas (remote shutdown panels, etc). Based on the lessons learned on development of NPP Krsko Basic Principle Simulator we decided for active approach. That means that NPP Krsko personnel will be heavily involved into all phases of KFSS development and testing. Since NPP Krsko is going to replace the existing steam generators, raise the nominal power and perform necessary modifications to support the power uprate, it was decided that the development of the KFSS will be conducted in two steps: 1. Development of the models as well as all the hardware interface in the MCR for the existing plant Cycle 15 and then, 2. Models and hardware will be modified, added or replaced as needed to take into account the steam generator replacement and plant uprate projects. In spite of the fact that the simulator will be used for the training of the plant operators for the uprated conditions and with new steam generators, the upper described approach was selected since we want to be sure that the models will at the beginning adequately simulate the existing plant. For the existing conditions we have available reference data for different plant conditions, as well as data for different plant transients. By verifying that simulator will be able adequately simulate the existing conditions the level of confidence for the uprated simulator will be much higher. This is of special importance since it will support initial training for modernized plant conditions. In this paper the plan for verification and qualification of KFSS as well as the amount of the work needed on NPP Krsko side to develop the test acceptance criteria will be presented.(author)

  11. Assessment of EPRI water chemistry guidelines for new nuclear power plants

    International Nuclear Information System (INIS)

    Reid Richard; Kim Karen; McCree, Anisa; Eaker, Richard; Sawochka, Steve; Giannelli, Joe

    2012-09-01

    Water chemistry control technologies for nuclear power plants have been significantly enhanced over the past few decades to improve material and equipment reliability and fuel performance, and to minimize radionuclide production and transport. Chemistry Guidelines have been developed by the Electric Power Research Institute (EPRI) for currently operating plants and have been intermittently revised over the past twenty-five years for the protection of systems and components and for radiation management. As new plants are being designed for improved safety and increased power production, it is important to ensure that the designs consider implementation of state-of-the-art, industry developed water chemistry controls. In parallel, the industry will need to consider and update water chemistry guidelines as well as plant startup and operational strategies based on the advanced plant designs. EPRI has performed assessments of water chemistry control guidance or assumptions provided in design and licensing documents for several advanced plant designs. These designs include: Westinghouse AP1000 Pressurized Water Reactor AREVA US-EPR Pressurized Water Reactor Mitsubishi Nuclear Energy Systems/Mitsubishi Heavy Industries Advanced Pressurized Water Reactor Korea Hydro and Nuclear Power APR1400 Pressurized Water Reactor Toshiba Advanced Boiling Water Reactor (ABWR) General Electric-Hitachi Economic Simplified Boiling Water Reactor (ESBWR) The intent of these assessments was to identify key design differences in each of the new plant designs relative to the current operating fleet and to identify differences in water chemistry specifications or design assumptions provided in design and licensing documents for the plants in comparison to current EPRI Water Chemistry Guidelines. This paper provides a summary of the key results of these assessments. The fundamental design and operation of the advanced plants is similar to the currently operating fleet. As such, the new plants are

  12. EPRI's zebra mussel monitoring and control guidelines

    International Nuclear Information System (INIS)

    Mussalli, Y.G.; Armor, A.; Edwards, R.; Mattice, J.; Miller, M.; Nott, B.; Tsou, J.L.

    1992-01-01

    The Electric Power Research Institute (EPRI) Zebra Mussel Monitoring and Control Guidelines is a comprehensive compilation of US and European practices. The zebra mussel has infested all the Great Lakes and is positioned to spread to the adjoining river basins. The impact of the zebra mussel on power plants is as a biofouler clogging water systems and heat exchangers. The EPRI guidelines discuss the distribution of the zebra mussel in the US, identification of the zebra mussel, potential threats to power plants, and methods to initiate the monitoring and control program. Both preventive and corrective measures are presented. Preventive measures include various monitoring methods to initiate control techniques. The control techniques include both chemical and nonchemical together with combining techniques. Corrective methods include operational considerations, chemical cleaning, and mechanical/physical cleaning. It may also be possible to incorporate design changes, such as open to closed-loop backfit, backflushing, or pretreatment for closed systems. Table 1 shows a matrix of the monitoring methods. Table 2 presents a control matrix related to nuclear, fossil, and hydro raw water systems. Table 3 is a summary of the applicability of treatments to the various raw water systems. Appendixes are included that contain specifications to aid utilities in implementing several of the control technologies

  13. Pilot study approach and qualification dossier components

    International Nuclear Information System (INIS)

    Ammirato, F.; Ashwin, P.

    2000-01-01

    The aim of the Pilot Project is to evaluate the IAEA Guidelines and methodology for the benefit of IAEA Member States trough a simulation of qualification activities. The Project is based on a real component and available data - NPP Kozloduy unit 5, weld 3. The initial phase is limited to the Qualification dossier. The Project relies on the input from the team members and Member States. Team organization and responsibilities are presented. The components of the Qualification Dossier (technical specification, inspection procedure and preliminary review, qualification procedure) and their current status are also presented. A comparison is done with their qualification programs. The characteristics of performance demonstrations are discussed. The results show that the teamwork has been successful and the IAEA methodology covers all situations. It is expected that the End Project will become 'Benchmark's' for future qualification activities

  14. Status of NRC approval of EPRI electromagnetic interference susceptibility testing guidelines for digital equipment

    International Nuclear Information System (INIS)

    James, R.W.; Shank, J.W.; Yoder, C.

    1996-01-01

    Historically, nuclear power plants installing digital equipment have been required to conduct expensive, site-specific electromagnetic interference (EMI) surveys to demonstrate that EMI will not affect the operation of sensitive electronic equipment. Consequently, EPRI formed a Utility Working Group which developed a set of generic EMI susceptibility testing guidelines, which were published as an EPRI report in September 1994. These guidelines are based upon EMI survey data obtained from several different plants and include criteria for determining their applicability. The Working Group interacted with NRC staff to obtain NRC approval. In April 1996, the NRC issued a Safety Evaluation Report (SER) endorsing the guidelines as a valid means of demonstrating EMI compatibility. The issuance of this SER was conditional on issuing a revision to the EPRI EMI Guidelines. This paper summarizes the guidelines, the NRC SER, and the current status of Revision 1 to the report

  15. Decision-making aid for operational crews. Status of the EPRI DASS project

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Cain, D.G.; Long, A.B.

    1983-01-01

    The paper covers recent work on the development of the Disturbance Analysis and Surveillance System (DASS) of the Electric Power Research Institute (EPRI), Palo Alto. The work at EPRI covered a BWR application and the development of advance concepts as applied to a PWR. The paper starts by considering the environment in which the DASS developments are taking place, especially the effect of observations resulting from evaluations of the Safety Parameter Display System (SPDS) in actual control rooms. It is pointed out that insights are being gained into the behaviour of reactor control room crews. The DASS group at EPRI has designed the control room operator aids for the process manager or systems manager. The paper covers the work on DASS in 1981 and 1982. The foundation of the work done in 1982 was established in 1981 when the DASS user and the functional design of software were defined, a working DASS was demonstrated and a portable test vehicle which could be used for dynamic evaluation of displays was developed. Both the philosophy and characteristics of the displays for the PWR and BWR DASS applications are discussed and pictures of the actual displays are included. The development and execution of a human factors plan is an integral part of the EPRI DASS programme and some discussion of the plan is included in the paper. It is concluded that there is a need for DASS-type systems and that such systems might be developed from an enhanced SPDS which would include the newly proposed emergency procedures based on identification of symptoms rather than events. (author)

  16. EPRI research on component aging and nuclear plant life extension

    International Nuclear Information System (INIS)

    Sliter, G.E.; Carey, J.J.

    1985-01-01

    This paper first describes several research efforts sponsored by the Electric Power Research Institute (EPRI) that examine the aging degradation of organic materials and the nuclear plant equipment in which they appear. This research includes a compendium of material properties characterizing the effects of thermal and radiation aging, shake table testing to evaluate the effects of aging on the seismic performance of electrical components, and a review of condition monitoring techniques applicable to electrical equipment. Also described is a long-term investigation of natural versus artificial aging using reactor buildings as test beds. The paper then describes how the equipment aging research fits into a broad-scoped EPRI program on nuclear plant life extension. The objective of this program is to provide required information, technology, and guidelines to enable utilities to significantly extend operating life beyond the current 40-year licensed term

  17. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    International Nuclear Information System (INIS)

    D. Tillman; E. Hughes

    1999-01-01

    During the period of April 1, 1999 through June 30, 1999, wood cofiring testing at both Seward Generating Station of GPU Genco and Bailly Generating Station of Northern Indiana Public Service Company provided the focus for all activities. In both cases, the testing was directed at the impacts of cofiring on efficiency, operability, and NO(sub x) emissions. This report summarizes the activities during the second calendar quarter in 1999 of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of testing activities at both generating stations

  18. EPRI training to support digital upgrades in nuclear plants

    International Nuclear Information System (INIS)

    Torok, R.; Naser, J.

    2006-01-01

    In response to the growing challenges of obsolescence and rising maintenance costs, utilities are increasingly upgrading or replacing their existing instrumentation and control (I and C) systems and components. In most cases, this involves analog-to-digital or digital-to-newer-digital replacements. However, the use of digital technology often raises new technical and licensing issues, particularly for safety-related applications. Examples include: new failure modes and the potential for common-mode failure of redundant components; electromagnetic compatibility (EMC); potential human-system interface problems; and software verification, validation, and configuration management. Successful implementation, operation and maintenance of digital systems depend to a great extent on having processes in place that are tailored for digital technology. Nuclear plants are therefore updating their processes as they start the migration to digital I and C. For several years, EPRI has been developing guidelines to address the key technical issues and interfacing with the U.S. NRC to ensure the acceptability of the approaches developed. A framework for implementing digital upgrades now exists, but practical experience under the current regulatory environment is sparse. Significant uncertainty exists in regard to both technical and licensing issues. Many utilities still need to prepare their staff and processes to properly handle the new technology. In recent years, this need has been exacerbated by staff reductions, changing job assignments, and declining training budgets. EPRI has responded by developing a training program to help utilities efficiently bring design and licensing engineers up to speed on the latest issues and guidance affecting the implementation of digital upgrades in nuclear plants. This paper describes the key technical issues in the context of the EPRI training program. (authors)

  19. EPRI expert system activities for nuclear utility industry application

    International Nuclear Information System (INIS)

    Naser, J.A.

    1990-01-01

    This paper reports on expert systems which have reached a level of maturity where they offer considerable benefits for the nuclear utility industry. The ability of expert systems to enhance expertise makes them an important tool for the nuclear utility industry in the areas of engineering, operations and maintenance. Benefits of expert system applications include comprehensive and consistent reasoning, reduction of time required for activities, retention of human expertise and ability to utilize multiple experts knowledge for an activity. The Electric Power Research Institute (EPRI) has been performing four basic activities to help the nuclear industry take advantage of this expert system technology. The first is the development of expert system building tools which are tailored to nuclear utility industry applications. The second is the development of expert system applications. The third is work in developing a methodology for verification and validation of expert systems. The last is technology transfer activities to help the nuclear utility industry benefit from expert systems. The purpose of this paper is to describe the EPRI activities

  20. Simulator data on human error probabilities

    International Nuclear Information System (INIS)

    Kozinsky, E.J.; Guttmann, H.E.

    1982-01-01

    Analysis of operator errors on NPP simulators is being used to determine Human Error Probabilities (HEP) for task elements defined in NUREG/CR 1278. Simulator data tapes from research conducted by EPRI and ORNL are being analyzed for operator error rates. The tapes collected, using Performance Measurement System software developed for EPRI, contain a history of all operator manipulations during simulated casualties. Analysis yields a time history or Operational Sequence Diagram and a manipulation summary, both stored in computer data files. Data searches yield information on operator errors of omission and commission. This work experimentally determines HEPs for Probabilistic Risk Assessment calculations. It is the only practical experimental source of this data to date

  1. Simulator data on human error probabilities

    International Nuclear Information System (INIS)

    Kozinsky, E.J.; Guttmann, H.E.

    1981-01-01

    Analysis of operator errors on NPP simulators is being used to determine Human Error Probabilities (HEP) for task elements defined in NUREG/CR-1278. Simulator data tapes from research conducted by EPRI and ORNL are being analyzed for operator error rates. The tapes collected, using Performance Measurement System software developed for EPRI, contain a history of all operator manipulations during simulated casualties. Analysis yields a time history or Operational Sequence Diagram and a manipulation summary, both stored in computer data files. Data searches yield information on operator errors of omission and commission. This work experimentally determined HEP's for Probabilistic Risk Assessment calculations. It is the only practical experimental source of this data to date

  2. EPRI program in water reactor safety

    International Nuclear Information System (INIS)

    Loewenstein, W.B.; Gelhaus, F.; Gopalakrishnan, A.

    1975-01-01

    The basis for EPRI's water reactor safety program is twofold. First is compilation and development of fundamental background data necessary for quantified light-water reactor (LWR) safety assurance appraisals. Second is development of realistic and experimentally bench-marked analytical procedures. The results are expected either to confirm the safety margins in current operating parameters, and to identify overly conservative controls, or, in some cases, to provide a basis for improvements to further minimize uncertainties in expected performance. Achievement of these objectives requires the synthesis of related current and projected experimental-analytical projects toward establishment of an experimentally-based analysis for the assurance of safety for LWRs

  3. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    Energy Technology Data Exchange (ETDEWEB)

    D. Tillman; E. Hughes

    1999-04-01

    During the period of January 1, 1999 through March 31, 1999, construction was performed in support of two major demonstrations. Major progress was made on several projects including cofiring at Seward (GPU Genco), and Bailly (NIPSCO). Most of the work was focused on construction and system commissioning activities at the Seward and Bailly Generating Stations. Additionally, petroleum coke cofiring testing was completed at the Bailly Generating Station. This report summarizes the activities during the first calendar quarter in 1999--the fourth contract quarter in 1998--of the USDOE/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon reporting the results of construction activities and related events.

  4. Instrumentation qualification. Seismic qualification of C-E instrumentation equipment. Part One

    International Nuclear Information System (INIS)

    1977-05-01

    A summary of the C-E seismic qualification program utilized to demonstrate the seismic design adequacy of the instrumentation and control equipment used in C-E supplied Nuclear Steam Supply Systems (NSSS) is presented. The report is divided into two parts. Part One includes the equipment seismic requirements and a description of the qualification methods. Part Two lists the specific equipment by nuclear station in which it is used and the equipment test results are summarized in a standard data sheet format to facilitate review. The seismic requirements are based on individual contract commitments with C-E customers and the NRC Standard Review Plan, Section 3.10 ''Seismic Qualification of Category I Instrumentation and Electrical Equipment.'' Equipment is qualified for use in a seismic environment where damage potential to the equipment is less than or equal to that simulated seismic environment to which it has been qualified. The anticipated Safe Shutdown Earthquake (SSE) environment at the inservice location of equipment should be confirmed by each applicant as not exceeding that to which it is qualified

  5. EPRI steam turbine and generator NDE, life assessment, and maintenance workshop

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.

    1992-10-01

    On July 16--19, 1991, the EPRI NDE Center hosted the second EPRI Steam Turbine and Generator NDE, Life Assessment and Maintenance Workshop. This workshop was co-sponsored by the Nuclear Power and the Generation and Storage Divisions of EPRI. Attendees represented all sectors of the industry including utilities, equipment manufacturers, forging suppliers, service organizations, government organizations, insurancecarriers, and consultants from the United States and abroad. Domestic utility presence was again strong, with 105 representatives from 44 utilities in attendance. Australia, Canada, England, Finland, France, Germany, Italy, Japan, Korea, New Zealand, Spain, Sweden and Switzerland were represented in the international contingent. A key and integral part of the workshop was a vendor equipment fair, in which some 23 organizations displayed and demonstrated equipment and services that they offer. Formal presentation of 53 technical papers made up the technical portion of the agenda, which also included two breakout discussion sessions on topical subjects. To provide optimum opportunity for participants to hear all presentations on closely related topics, the sessions were set such that a NDE session ran parallel to the life assessment session. The first NDE session included turbine related topics while the first life assessment session addressed generator issues. The last sessions of the workshop were just reversed with turbine topics being addressed in the life assessment session while generator issues were presented in the NDE session. Presentations on maintenance topics and on monitoring and diagnostics topics were also presented in parallel sessions. These proceedings contain the texts of the papers presented at the workshop. Individual papers in indexed separately

  6. Characterization of the EPRI Differential Absorption Lidar (DIAL) System. Final report. [For remote sensing of air pollutants

    Energy Technology Data Exchange (ETDEWEB)

    Baumgartner, R.A.; Depp, J.G.; Evans, W.E.; Grant, W.B.; Hawley, J.G.; March, R.G.; Murray, E.R.; Proctor, E.K.

    1979-12-01

    SRI International designed and constructed a DIfferential Absorption Lidar (DIAL) to provide EPRI with a mobile field system for remote measurements of SO/sub 2/, NO/sub 3/, and O/sub 3/. After field testing the lidar was prepared for the sytem calibration testing where lidar measurements were compared to in situ profiles of SO/sub 2/, NO/sub 2/, and O/sub 3/. This two-week field program determined overall system accuracy and reliability in measuring varying ambient gas concentrations. The lidar was then returned to SRI for detailed subsystem performance evaluations. Improvements were made wherever possible, and the lidar was prepared for further systems tests. Tests were made using an NO/sub 2/ sample chamber to simulate a calibrated NO/sub 2/ plume, and ambient measured NO/sub 2/ concentrations were compared with values from a regional air pollutant monitoring station. Following the local calibration and the systems field tests, SRI evaluated the performance and reliability of the EPRI lidar. Based on that evaluation, SRI undertook a major analysis of possible system improvements. Although the remote measuring capability had been successfully demonstrated in the field program, SRI makes several recommendations for systems improvements which would increase the lidar accuracy and reliability.

  7. The impact of changing computing technology on EPRI [Electric Power Research Institute] nuclear analysis codes

    International Nuclear Information System (INIS)

    Breen, R.J.

    1988-01-01

    The Nuclear Reload Management Program of the Nuclear Power Division (NPD) of the Electric Power Research Institute (EPRI) has the responsibility for initiating and managing applied research in selected nuclear engineering analysis functions for nuclear utilities. The computer systems that result from the research projects consist of large FORTRAN programs containing elaborate computational algorithms used to access such areas as core physics, fuel performance, thermal hydraulics, and transient analysis. This paper summarizes a study of computing technology trends sponsored by the NPD. The approach taken was to interview hardware and software vendors, industry observers, and utility personnel focusing on expected changes that will occur in the computing industry over the next 3 to 5 yr. Particular emphasis was placed on how these changes will impact engineering/scientific computer code development, maintenance, and use. In addition to the interviews, a workshop was held with attendees from EPRI, Power Computing Company, industry, and utilities. The workshop provided a forum for discussing issues and providing input into EPRI's long-term computer code planning process

  8. LTP fibre injector qualification and status

    International Nuclear Information System (INIS)

    Bogenstahl, J; Cunningham, L; Fitzsimons, E D; Hough, J; Killow, C J; Perreur-Lloyd, M; Robertson, D; Rowan, S; Ward, H

    2009-01-01

    This paper presents the current state of the LISA Technology Package (LTP) fibre injector qualification project in terms of vibration and shock tests. The fibre injector is a custom built part and therefore must undergo a full space qualification process. The mounting structure and method for sinusoidal vibration and random vibration tests as well as shock tests will be presented. Furthermore a proposal will be presented to use the fibre injector pair qualification model to build an optical prototype bench. The optical prototype bench is a full-scale model of the flight model. It will be used for development and rehearsal of all the assembly stages of the flight model and will provide an on-ground simulator for investigation as an updated engineering model.

  9. A review of the EPRI hydroloads program

    International Nuclear Information System (INIS)

    Oehlberg, R.N.

    1983-01-01

    For a large, rapid, close-to-the-vessel break of a pressurized water reactor (PWR) inlet pipe, hydrodynamic loads in the primary system were speculated by the U.S. Nuclear Regulatory Commission (NRC) to have licensing significance during the subcooled portions of a hypothetical loss-of-coolant accident (LOCA). The analytical methods which are used to analyze hydroloads for licensing submittals rely on one-dimensional modeling techniques and require significant engineering judgement to couple the internal structures, such as the core support barrel, and the adjacent fluid. These analysis methods are expected to overestimate the acceleration and impact forces on primary system components. Methodology enhancements were made in a stepwise fashion, (1D, 2D, then 3D). The modified computer programs were then assessed by comparing calculated results with analytical solutions and experimental data. The calculated results compared favorably with the analytical and experimental results. Furthermore, the calculation of HDR tests V31.3 and V32 proved to be valuable for understanding the fundamental mechanics of fluid-structure interaction in large-scale systems during subcooled blowdown. The final stage of the EPRI program was to apply the coupled, 3D fluid-structure interaction methodology to the calculation of the hydrodynamic loads in a modified HDR model having a dynamic axially distributed core. EPRI's fluid-structure interaction program has resulted in state-of-the-art technology which can be applied to both nuclear licensing and engineering problems without the significant engineering judgment required of less sophisticated methods. Realistics loads can be obtained to quantify conservatisms in current licensing approaches. (orig./GL)

  10. Overview of EPRI's human factors research program

    International Nuclear Information System (INIS)

    O'Brien, J.F.; Parris, H.L.

    1981-01-01

    The human factors engineering program in the Nuclear Power Division, EPRI is dedicated to the resolution of man-machine interface problems specific to the nuclear power industry. Particularly emphasis is placed on the capabilities and limitations of the people who operate and maintain the system, the tasks they must perform, and what they need to accomplish those tasks. Six human factors R and D projects are being conducted at the present time. In addition, technical consultation is being furnished to a study area, operator aids, being funded by another program area outside the human factors program area. All of these activities are summarized

  11. Software qualification of selected TOUGH2 modules

    International Nuclear Information System (INIS)

    Wu, Y.S.; Ahlers, C.F.; Fraser, P.; Simmons, A.; Pruess, K.

    1996-10-01

    The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of the single-phase Gas (EOS1G), Effective Continuum Method (ECM), Saturated/Unsaturated Flow (EOS9), and Radionuclide Transport (T2R3D) modules of TOUGH2, a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. This report contains the following sections: (1) Requirements Specification, (2) Design Description, (3) Software Validation Test Plan and Report, (4) Software User Documentation, and (5) Appendices. These sections comprise sequential parts of the Software Life Cycle, and are not intended to stand alone but should be used in conjunction with the TOUGH User's Guide (Pruess, 1987), TOUGH2--A General Purpose Numerical Simulator for Multiphase Fluid and Heat Flow (Pruess, 1991), and the above-referenced TOUGH2 software qualification document. The qualification package is complete with the attached Software Identification Form and executable source code for the single-phase Gas, Effective Continuum method, Saturated/Unsaturated Flow, and Radionuclide Transport modules of TOUGH2

  12. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  13. Proceedings: 1991 EPRI workshop on secondary-side intergranular corrosion mechanisms

    International Nuclear Information System (INIS)

    Partridge, M.J.; Zemitis, W.S.

    1992-08-01

    A workshop on ''Secondary-Side Intergranular Corrosion Mechanisms'' was organized by EPRI as an effort to give those working in this area an opportunity to share their results, ideas, and plans. Topics covered included: (1) caustic induced intergranular attack/stress corrosion cracking (IGA/IGSCC), (2) plant experience, (3) boric acid as an IGA/IGSCC remedial measure, (4) lead induced IGA/IGSCC, and (5) acid induced IGA/IGSCC

  14. 'EPRI tailored collaboration 2, Crystal River cost and volume reduction program'

    International Nuclear Information System (INIS)

    Genoa, P.H.

    1995-01-01

    During the fall of 1993. Florida Power Corporation joined the EPRI tailored collaboration on the low-level radioactive waste cost and volume reduction. In conjunction with an existing Radwaste Task Force, the EPRI team reviewed past and current waste management practices and developed a prioritized list of opportunities for improvement. In the first quarter of 1994, these opportunities were converted into Action Plans with responsibilities and due dates assigned to support a 60-day refueling outage beginning on April 7, 1994. The Action Plans focussed on: (1) Visible management support in the form of specific plant, department, and worker level radwaste reduction goals. (2) Heightened worker awareness in the form of training (formal and informal), signs, bulletins, and a radwaste awareness video. (3) Material changes from disposable to recyclables, non-incinerables to incinerables, liquid waste processing media replacements and filter use criteria. (4) Work practice changes to reduce valve leaks, reduce contaminated areas, reduce entries to contaminated areas, further segregation of waste streams including 'green is clean' wastes

  15. The new lattice code Paragon and its qualification for PWR core applications

    International Nuclear Information System (INIS)

    Ouisloumen, M.; Huria, H.C.; Mayhue, L.T.; Smith, R.M.; Kichty, M.J.; Matsumoto, H.; Tahara, Y.

    2003-01-01

    Paragon is a new two-dimensional transport code based on collision probability with interface current method and written entirely in Fortran 90/95. The qualification of Paragon has been completed and the results are very good. This qualification included a number of critical experiments. Comparisons to the Monte Carlo code MCNP for a wide variety of PWR assembly lattice types were also performed. In addition, Paragon-based core simulator models have been compared against PWR plant startup and operational data for a large number of plants. Some results of these calculations and also comparisons against models developed with a licensed Westinghouse lattice code, Phoenix-P, are presented. The qualification described in this paper provided the basis for the qualification of Paragon both as a validated transport code and as the nuclear data source for core simulator codes

  16. Inspection qualification and implementation of ENIQ in Sweden

    International Nuclear Information System (INIS)

    Zettervall, Tommy

    2013-01-01

    Many countries are currently considering their approaches to inspection qualification and risk-informed in-service inspection (RI-ISI) and are carefully assessing experience data. In Europe most of the utilities operating nuclear power plants have joined together to form the European Network for Inspection Qualification ENIQ. In practice, qualification can be performed with varying degrees of complexity and cost, varying from capability statement based on existing evidence, through to an extensive qualification consisting of a detailed Technical Justification (TJ) together with open and blind trials on full-scale test blocks. An Inspection Qualification is an investigation and demonstration, which confirm that an inspection system has the ability to solve its specific tasks. The qualification is a Quality Assurance of an inspection system based on documents and practical trials. A reliable inspection system, based on a reliable qualification and correct prerequisites, will reduce total costs for Licensees and increase the credibility of the inspection result. To get such inspection system, which could be valid for many years, it's of necessity to fulfil all included parts in the process. It begins with the Technical Specification from Licensee, where input data and requirements about the actual component are specified. To get an inspection system that could live over time, the Technical Justification is of importance. Finally the test blocks and used simulation techniques play an important part of the final result, and these test blocks together with TJ form the basis for qualification body's decision. (author)

  17. EPRI/NRC-RES fire PRA guide for nuclear power facilities. Volume 1, summary and overview

    International Nuclear Information System (INIS)

    2004-01-01

    This report documents state-of-the-art methods, tools, and data for the conduct of a fire Probabilistic Risk Assessment (PRA) for a commercial nuclear power plant (NPP) application. The methods have been developed under the Fire Risk Re-quantification Study. This study was conducted as a joint activity between EPRI and the U. S. NRC Office of Nuclear Regulatory Research (RES) under the terms of an EPRI/RES Memorandum of Understanding (RS.1) and an accompanying Fire Research Addendum (RS.2). Industry participants supported demonstration analyses and provided peer review of this methodology. The documented methods are intended to support future applications of Fire PRA, including risk-informed regulatory applications. The documented method reflects state-of-the-art fire risk analysis approaches. The primary objective of the Fire Risk Study was to consolidate recent research and development activities into a single state-of-the-art fire PRA analysis methodology. Methodological issues raised in past fire risk analyses, including the Individual Plant Examination of External Events (IPEEE) fire analyses, have been addressed to the extent allowed by the current state-of-the-art and the overall project scope. Methodological debates were resolved through a consensus process between experts representing both EPRI and RES. The consensus process included a provision whereby each major party (EPRI and RES) could maintain differing technical positions if consensus could not be reached. No cases were encountered where this provision was invoked. While the primary objective of the project was to consolidate existing state-of-the-art methods, in many areas, the newly documented methods represent a significant advancement over previously documented methods. In several areas, this project has, in fact, developed new methods and approaches. Such advances typically relate to areas of past methodological debate.

  18. Concrete containment integrity program at EPRI

    International Nuclear Information System (INIS)

    Winkleblack, R.K.; Tang, Y.K.

    1984-01-01

    Many in the nuclear power plant business believe that the catastrophic failure mode for reactor containment structures is unrealistic. One of the goals of the EPRI containment integrity program is to demonstrate that this is true. The objective of the program is to provide the utility industry with an experimental data base and a test-validated analytical method for realistically evaluating the actual over-pressure capability of concrete containment buildings and to predict leakage behavior if higher pressures were to occur. The ultimate goal of this research effort is to characterize the containment leakage mode and rate as a function of internal pressure and time so that the risk can be realistically assessed for hypothetical degraded core accidents. Progress in the first and second phases of the three-phase analytical and testing efforts is discussed

  19. A combined positron emission tomography (PET)- electron paramagnetic resonance imaging (EPRI) system: initial evaluation of a prototype scanner.

    Science.gov (United States)

    Tseytlin, Mark; Stolin, Alexander V; Guggilapu, Priyaankadevi; Bobko, Andrey A; Khramtsov, Valery V; Tseytlin, Oxana; Raylman, Raymond R

    2018-04-20

    The advent of hybrid scanners, combining complementary modalities, has revolutionized imaging; enhancing clinical practice and biomedical research. In this project, we investigated the melding of two complementary, functional imaging methods: positron emission tomography (PET) and electron paramagnetic resonance imaging (EPRI). The PET radiotracers can provide important information about cellular parameters, such as glucose metabolism. While EPR probes can provide assessment of tissue microenvironment, measuring parameters such as oxygenation and pH, for example. A combined PET/EPRI scanner has the promise to provide new insights not attainable with current imagers by simultaneous acquisition of multiple components of tissue microenvironments. In this investigation, a prototype system was created by combing two existing scanners, modified for simultaneous imaging. Specifically, a silicon photomultiplier (SiPM) based PET scanner ring designed as a portable scanner was combined with an EPRI scanner designed for the imaging of small animals. The ability of the system to obtain simultaneous images was assessed with a small phantom consisting of four cylinders containing both PET and EPR tracers. The resulting images demonstrated the ability to obtain contemporaneous PET and ERP images without cross-modality interference. The next step in this project is the construction of pre-clinical PET/EPRI scanner for multi-parametric assessment of physiologically important parameters of tissue microenvironments. . © 2018 Institute of Physics and Engineering in Medicine.

  20. A combined positron emission tomography (PET)-electron paramagnetic resonance imaging (EPRI) system: initial evaluation of a prototype scanner

    Science.gov (United States)

    Tseytlin, Mark; Stolin, Alexander V.; Guggilapu, Priyaankadevi; Bobko, Andrey A.; Khramtsov, Valery V.; Tseytlin, Oxana; Raylman, Raymond R.

    2018-05-01

    The advent of hybrid scanners, combining complementary modalities, has revolutionized the application of advanced imaging technology to clinical practice and biomedical research. In this project, we investigated the melding of two complementary, functional imaging methods: positron emission tomography (PET) and electron paramagnetic resonance imaging (EPRI). PET radiotracers can provide important information about cellular parameters, such as glucose metabolism. While EPR probes can provide assessment of tissue microenvironment, measuring oxygenation and pH, for example. Therefore, a combined PET/EPRI scanner promises to provide new insights not attainable with current imagers by simultaneous acquisition of multiple components of tissue microenvironments. To explore the simultaneous acquisition of PET and EPR images, a prototype system was created by combining two existing scanners. Specifically, a silicon photomultiplier (SiPM)-based PET scanner ring designed as a portable scanner was combined with an EPRI scanner designed for the imaging of small animals. The ability of the system to obtain simultaneous images was assessed with a small phantom consisting of four cylinders containing both a PET tracer and EPR spin probe. The resulting images demonstrated the ability to obtain contemporaneous PET and EPR images without cross-modality interference. Given the promising results from this initial investigation, the next step in this project is the construction of the next generation pre-clinical PET/EPRI scanner for multi-parametric assessment of physiologically-important parameters of tissue microenvironments.

  1. Technology transfer equipment qualification methodology for shelf life determination

    International Nuclear Information System (INIS)

    Anderson, J.W.

    1995-01-01

    Discussions with a number of Nuclear Utilities revealed that equipment qualified for 10 to 40 years in the harsh environment of the plant was being assigned shelf lives of only 5 to 10 years in the benign environment of the warehouse, and then the materials were being trashed. One safety-related equipment supplier was assigning a 10-year qualified life, from date of shipment, with no recognition of the difference in the aging rate in the plant vs. that in the warehouse. Many suppliers assign shelf lives based on product warranty considerations rather than actual product degradation. An EPRI program was initiated to evaluate the methods used to assign shelf lives and to adapt the Arrhenius methodology, used in equipment qualification, to assign technically justifiable shelf lives. Temperature is the main factor controlling shelf life; however, atmospheric pressure, humidity, ultraviolet light, ozone and other atmospheric contaminants were also considered. A list of 70 representative materials was addressed in the program. All of these were found to have shelf lives of 14 years to greater than 60 years, except for 19 items. For 18 of these items, there was no data available except for the manufacturer's recommendation

  2. EPRI MOV performance prediction program

    International Nuclear Information System (INIS)

    Hosler, J.F.; Damerell, P.S.; Eidson, M.G.; Estep, N.E.

    1994-01-01

    An overview of the EPRI Motor-Operated Valve (MOV) Performance Prediction Program is presented. The objectives of this Program are to better understand the factors affecting the performance of MOVs and to develop and validate methodologies to predict MOV performance. The Program involves valve analytical modeling, separate-effects testing to refine the models, and flow-loop and in-plant MOV testing to provide a basis for model validation. The ultimate product of the Program is an MOV Performance Prediction Methodology applicable to common gate, globe, and butterfly valves. The methodology predicts thrust and torque requirements at design-basis flow and differential pressure conditions, assesses the potential for gate valve internal damage, and provides test methods to quantify potential for gate valve internal damage, and provides test methods to quantify potential variations in actuator output thrust with loading condition. Key findings and their potential impact on MOV design and engineering application are summarized

  3. EPRI PWR primary water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Fruzzetti, Keith

    2014-01-01

    EPRI periodically updates the PWR Primary Water Chemistry Guidelines as new information becomes available and as required by NEI 97-06 (Steam Generator Program Guidelines) and NEI 03-08 (Guideline for the Management of Materials Issues). The last revision of the PWR water chemistry guidelines identified an optimum primary water chemistry program based on then-current understanding of research and field information. This new revision provides further details with regard to primary water stress corrosion cracking (PWSCC), fuel integrity, and shutdown dose rates. A committee of industry experts, including utility specialists, nuclear steam supply system (NSSS) and fuel vendor representatives, Institute of Nuclear Power Operations (INPO) representatives, consultants, and EPRI staff collaborated in reviewing the available data on primary water chemistry, reactor water coolant system materials issues, fuel integrity and performance issues, and radiation dose rate issues. From the data, the committee updated the water chemistry guidelines that all PWR nuclear plants should adopt. The committee revised guidance with regard to optimization to reflect industry experience gained since the publication of Revision 6. Among the changes, the technical information regarding the impact of zinc injection on PWSCC initiation and dose rate reduction has been updated to reflect the current level of knowledge within the industry. Similarly, industry experience with elevated lithium concentrations with regard to fuel performance and radiation dose rates has been updated to reflect data collected to date. Recognizing that each nuclear plant owner has a unique set of design, operating, and corporate concerns, the guidelines committee has retained a method for plant-specific optimization. Revision 7 of the Pressurized Water Reactor Primary Water Chemistry Guidelines provides guidance for PWR primary systems of all manufacture and design. The guidelines continue to emphasize plant

  4. EPRI News

    International Nuclear Information System (INIS)

    Douglas, J.

    1991-01-01

    This paper reports that from instant sensation to virtual pariah, cold fusion has had a stormy history since two University of Utah researchers first announced its discovery in March 1989. Research into this mysterious phenomenon has been plagued both by technical difficulties in replicating experimental results and by sometimes bitter controversy over scientific standards and personal credibility. Now, in a somewhat calmer atmosphere, significant progress is being made through experiments that are reproducible over long periods of time and under a variety of conditions. These experiments indicate that nuclear reactions may indeed occur at room temperature in a crystal lattice in ways not understood before. It's time we stopped calling these reactions cold fusion, says David Worledge, EPRI coordinator of research in this area. There is now good evidence that cold nuclear reaction of some sort are taking place, but also growing indications that they aren't conventional deuterium-deuterium fusion, as first assumed. Also, the cold nuclear reactions inferred from the neutrons that have been detected are not numerous enough to be responsible for the excess heat production still being reported in some experiments. In their original work, University of Utah scientist Martin Fleischmann and Stanley Pons used a simple laboratory apparatus consisting of a palladium rod surrounded by a platinum coil and immersed in heavy water. They reported that when a small electric current was applied to the cells, deuterium nuclei from the heavy water were driven into the palladium rod, where they were held in the metal lattice and apparently fused, producing 4 watts of heat for each watt of electric power supplied

  5. Baseline Fracture Toughness and CGR testing of alloys X-750 and XM-19 (EPRI Phase I)

    International Nuclear Information System (INIS)

    Jackson, J.H.; Teysseyre, S.P.

    2012-01-01

    The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. This report contains results from the portion of this program established as Phase I (of three phases) that entails baseline fracture toughness, stress corrosion cracking (SCC), and tensile testing of selected materials for comparison to similar tests conducted at GE Global Research. The intent of this Phase I research program is to determine baseline properties for the materials of interest prior to irradiation, and to ensure comparability between laboratories using similar testing techniques, prior to applying these techniques to the same materials after having been irradiated at the Advanced Test Reactor (ATR). The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19. A spare core shroud upper support bracket of alloy X-750 was purchased by EPRI from Southern Co. and a section of XM-19 plate was purchased by EPRI from GE-Hitachi. These materials were sectioned at GE Global Research and provided to INL.

  6. Study of heat transfer in 3D fuel rods of the EPRI-9R reactor modified; Estudo da transferencia de calor em varetas combustiveis 3D do reator EPRI-9R 3D modificado

    Energy Technology Data Exchange (ETDEWEB)

    Affonso, Renato Raoni Werneck; Lava, Deise Diana; Borges, Diogo da Silva; Sampaio, Paulo Augusto Berquo de; Moreira, Maria de Lourdes, E-mail: raoniwa@yahoo.com.br, E-mail: deisedy@gmail.com, E-mail: diogosb@outlook.com, E-mail: sampaio@ien.gov.br, E-mail: malu@ien.gov.br [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2014-07-01

    This paper aims to conduct a case study of the fuel rods that have the highest and the lowest average power of the EPRI-9R 3D reactor modified , for various positions of the control rods banks. For this, will be addressed the verification of computer code, comparing the results obtained with analytical solutions. This check is important so that, subsequently, it is possible use the program to understand the behavior of the fuel rods and the coolant channel of the EPRI-9R 3D reactor modified. Thus, in view of the scope of this paper, first a brief introducing on the heat transfer is done, including the rod equations and the equation of energy in the channel to allow the analysis of the results.

  7. The comparison between layout and design of APR1400 MCR and EPRI requirement

    International Nuclear Information System (INIS)

    Suharyo Widagdo; Darlis; Sigit Santoso; T J Suryono

    2013-01-01

    A good man-machine interface system is needed by a nuclear power reactor because of its complexity and high safety factor. The man-machine interface system is centralized in the main control room (MCR). All of monitoring and controlling activity to keep the installation operation safety can be done from this place. In order to increase its ability in monitoring and controlling a hard effort to raise the interface system to the highest possible level is done not only by using the latest computer technology and instrumentation system but also using Human Engineering, as well. The paper aims to compare the lay out and design the APR1400 MCR and the requirement from EPRI about main control room lay out and design as response of TMI-2 accident. We can see from the discussion that the design of the MCR of APR1400 have been applied the request of EPRI. (author)

  8. KBTAC [Knowledge-Based Technology Application Center] - The EPRI [Electric Power Research Institute]-sponsored knowledge-based technology application center

    International Nuclear Information System (INIS)

    Meyer, W.; Wood, R.M.; Scherer, J.

    1990-01-01

    The Electric Power Research Institute (EPRI) has announced the establishment of the Knowledge-Based Technology Application Center (KBTAC), whose goal is to assist member utilities with expert system technology and applications. The center, established November 7, 1989, is located on the campus of Syracuse University, Syracuse, New York, and will be operated jointly by Kaman Sciences Corporation and the university. The mission of the KBTAC is to assist EPRI member utilities to develop, test, and transfer expert systems into nuclear power plant operations, maintenance, and administration

  9. Seismic qualification testing at the National Engineering Laboratory

    International Nuclear Information System (INIS)

    Fairbairn, J.

    1984-01-01

    Servohydraulic shaker tables have been developed for the simulation of vibration environments including earthquakes. The use of these facilities for seismic qualification of nuclear equipment is described. (author)

  10. EPRI tailored collaboration 3 Calvert Cliffs cost and volume reduction program

    International Nuclear Information System (INIS)

    Rigsby, M.D.; Watson, B.A.

    1995-01-01

    Baltimore Gas ampersand Electric's (BGE) Calvert Cliffs Nuclear Power Plant (CCNPP) is a two unit PWR located approximately 60 miles south of Baltimore, Maryland on the Chesapeake Bay. Both units are of Combustion Engineering design, Unit 1 began commercial operation is 1975 and Unit 2 in 1978. BGE contracted with EPRI to participate in the industry initiative to reduce low-level waste volumes with the expectation to: (1) Reduce O ampersand M costs through LLRW reduction by lowering the volume requiring processing, transportation, and storage/disposal. (2) Manage responsibility available resources; i.e., material, equipment, personnel, etc., through segregation. decontamination, recycling and worker awareness. (3) Improve Calvert Cliff's positive image in the community by minimizing the impact on the environment through generating less LLRW. Baltimore Gas ampersand Electric is committed to effective management of low-level radioactive waste (LLRW) at the Calvert Cliffs Nuclear Power Plant. Established Nuclear Program Policies and Procedures support CCNPP's commitment to minimizing generation of low-level radioactive waste (LLRW). Since the mid 1980's, CCNPP has made progress in reducing the volume of LLRW generated and disposed. EPRI's onsite assessment and subsequent assistance pointed out several areas for improvement

  11. Methods Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Alessi, R. Sam; Grimmett, Tami; Vang, Leng; McGrath, Dave

    2010-01-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V and V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  12. Methods Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  13. Qualification standard for photovoltaic concentrator modules

    Energy Technology Data Exchange (ETDEWEB)

    McConnell, R.; Kurtz, S.; Bottenberg, W. R.; Hammond, R.; Jochums, S. W.; McDanal, A. J.; Roubideaux, D.; Whitaker, C.; Wohlgemuth, J.

    2000-05-05

    The paper describes a proposed qualification standard for photovoltaic concentrator modules. The standard's purpose is to provide stress tests and procedures to identify any component weakness in photovoltaic concentrator modules intended for power generation applications. If no weaknesses are identified during qualification, both the manufacturer and the customer can expect a more reliable product. The qualification test program for the standard includes thermal cycles, humidity-freeze cycles, water spray, off-axis beam damage, hail impact, hot-spot endurance, as well as electrical tests for performance, ground continuity, isolation, wet insulation resistance, and bypass diodes. Because concentrator module performance can not be verified using solar simulator and reference cell procedures suitable for flat-plate modules, the standard specifies an outdoor I-V test analysis allowing a performance comparison before and after a test procedure. Two options to this complex analysis are the use of a reference concentrator module for side-by-side outdoor comparison with modules undergoing various tests and a dark I-V performance check.

  14. EPRI fuel performance data base: user's manual. Final report

    International Nuclear Information System (INIS)

    Simpson, J.; Lee, S.; Rumble, E.

    1980-10-01

    This user's manual provides instructions for accessing the data in the EPRI fuel performance data base (FPDB) and manipulating that data to solve specific problems that the user wishes to specify. The user interacts with the FPDB through the Relational Information Management System (RIMS) computer program. The structure and format of the FPDB and the general syntax of the data base commands are described. Instructions follow for the use of each command. Appendixes provide more detailed information about the FPDB and its software. The FPDB currently resides on a PRIME-750 computer

  15. Progress in EPRI-programs on the inspection of cast austenitic stainless steel

    Energy Technology Data Exchange (ETDEWEB)

    Dau, G; Behravesh, M; Amirato, P; Stone, R [Electric Power Research Inst., Charlotte, NC (United States). Nondestructive Evaluation Center

    1988-12-31

    This document presents the progress in EPRI programs on in-service inspection of Cast austenitic Stainless Steel (CSS). The CSS examination strategy is presented, together with results concerning thermal fatigue cracks and mechanical fatigue cracks. A statistical analysis method is provided, in order to estimate the crack detectability and the false call (a non-crack called crack). (TEC).

  16. Open-Source RTOS Space Qualification: An RTEMS Case Study

    Science.gov (United States)

    Zemerick, Scott

    2017-01-01

    NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.

  17. Assessing coal combustion and sourcing strategies using EPRI`s CQIM{sup {trademark}}

    Energy Technology Data Exchange (ETDEWEB)

    Stallard, G.S.; Jennison, K.D. [Black & Veatch, Overland Park, KS (United States)

    1995-12-01

    Understanding the cost and performance issues associated with coal quality or, more precisely, specific constituents within coal is an important ingredient of engineering and planning processes. Such processes can cover a wide range of activities, including how to most cost-effectively burn local coal supplies, how to identify what technologies or designs should be employed for new facilities, and how to identify potentially viable {open_quotes}new{close_quotes} coal supplies. Selection of coals, coal blends, or coal benefication processes is a complex problem. Similarly, it is difficult for industry participants (ministries, regulators, distribution companies, etc.) To correlate fuel selection strategies to overall power system performance costs. The underlying need to understand coal quality impacts on the financial efficiency of a plant is increasingly important in light of economic and environmental pressures faced by today`s power industry. The Coal Quality Impact Model (CQIM{reg_sign}) offers an ideal platform for understanding and evaluating coal quality impacts. Developed by Black & Veatch for the electric Power Research Institute (EPRI), CQIM is a computer {open_quotes}tool{close_quotes} that is dedicated to maintaining state-of-the-art status by continually incorporating the latest technologies or modeling techniques as they become available. By taking advantage of research efforts and a sound engineering modeling approach, the CQIM is capable of predicting plant-wide performance impacts and translating them into costs.

  18. Organics in the power plant cycle. An EPRI perspective

    Energy Technology Data Exchange (ETDEWEB)

    Mathews, James A. [EPRI, Charlotte, NC (United States)

    2008-11-15

    Irrespective of past practices and prejudices, the use of organic treatment chemicals to address new and ongoing concerns in the operation of power plant cycles is increasing. Electric Power Research Institute (EPRI) guidelines currently do not advocate the use of organic additives, citing that these additives should not be needed and that breakdown products pose problems with analytical measurement of cation conductivity and operation of condensate polishers. Some of the concerns about organic treatment are hidden in the association of ''organics'' with naturally occurring organic compounds from contamination sources such as cooling water, lubrication systems, or make-up water treatment and cleaning agents. However, conditions in the 2-phase fluid regions of low pressure heat recovery steam generators (HRSGs), feedwater heaters, the turbine phase transition zone (PTZ), and air-cooled condensers remain problematic and warrant investigation of conditioning with some complex amine type organic treatments. Nuclear plants have employed advanced organic amines such as ethanolamine to address concerns of low pH in condensing steam. Increasing understanding of the formation, morphology and dynamics of boiler deposits may demonstrate the capability to modify the deposit nature and restrict the accumulation of contaminants; what role potential organic treatments may have in this is unclear at this time. The aim of EPRI in the assessment of organics in the fossil power plant cycle is to accomplish a greater understanding of the role, risks and benefits of organic treatment and to more fully engage the technical community in adoption of best practices for the optimum use of these treatments. (orig.)

  19. Helped positioning by using a simulation tool for qualification of PWR vessel examination technique

    International Nuclear Information System (INIS)

    Lasserre, Frederic; Pasquier, Thierry; Haiat, Guillaume; Calmon, Pierre; Leberre, Stephane; Lutsen, Mickael

    2006-01-01

    INTERCONTROLE have been performing the examination of all PWR vessels in France from the inside, using UT techniques since 1975. The in-service inspection machine (MIS) features several tools equipped with focussed transducers; each tool is dedicated to one specific area of the vessel. In the core region, the very first millimeters from the cladding-base metal interface has to be inspected with accuracy because of the under-cladding cracks type defects (perpendicular to the inner surface) likely to be found. The technique used up to now was qualified according to the RSE-M code in 1998. It is based on a set of 63 angle L-waves transducers specifically designed for the detection of defect tip diffraction echoes in the 25 first millimeters in through-wall thickness. The analysis methods for defect characterization are based on a global integration of various cladding induced phenomena. The technique, the procedure and the analysis methods were qualified for a given limited volume. The new qualification in process in France, requires that INTERCONTROLE find solutions for increasing the accuracy of the analysis, in a larger qualification volume than before, while remaining in close compliance with the RSE-M code. A new computer assisted analysis tool for the characterization, the sizing and the positioning of defects is part of the improvements currently in progress or already completed. This tool is the result of a thesis commissioned to the CEA (Atomic Energy Commission), now implemented in the CIVAMIS software (developed on a CIVA based system). The updated version of CIVAMIS including this characterization tool and the RSE-M qualification of the new analysis method (with validation on mock-ups) is now qualified. Despite of a larger qualification volume, the results obtained (mentioned in the present paper) fulfill the customer's requirements thanks to the amount of data, of information and of knowledge, available today. The ability to simulate the cladding in terms

  20. Study of heat transfer in 3D fuel rods of the EPRI-9R reactor modified

    International Nuclear Information System (INIS)

    Affonso, Renato Raoni Werneck; Lava, Deise Diana; Borges, Diogo da Silva; Sampaio, Paulo Augusto Berquo de; Moreira, Maria de Lourdes

    2014-01-01

    This paper aims to conduct a case study of the fuel rods that have the highest and the lowest average power of the EPRI-9R 3D reactor modified , for various positions of the control rods banks. For this, will be addressed the verification of computer code, comparing the results obtained with analytical solutions. This check is important so that, subsequently, it is possible use the program to understand the behavior of the fuel rods and the coolant channel of the EPRI-9R 3D reactor modified. Thus, in view of the scope of this paper, first a brief introducing on the heat transfer is done, including the rod equations and the equation of energy in the channel to allow the analysis of the results

  1. Hydrogen-migration modeling for the EPRI/HEDL standard problems

    International Nuclear Information System (INIS)

    Travis, J.R.

    1982-01-01

    A numerical technique has been developed for calculating the full three-dimensional time-dependent Navier-Stokes equations with multiple species transport. The method is a modified form of the Implicit Continuous-fluid Eulerian (ICE) technique to solve the governing equations for low Mach number flows where pressure waves and local variations in compression and expansion are not significant. Large density variations, due to thermal and species concentration gradients, are accounted for without the restrictions of the classical Boussinesq approximation. Calculations of the EPRI/HEDL standard problems verify the feasibility of using this finite-difference technique for analyzing hydrogen dispersion within LWR containments

  2. An Overview of the EPRI PWR Primary Chemistry Program

    International Nuclear Information System (INIS)

    Perkins, David; Fruzzetti, Keith; Haas, Carey; Wells, Dan

    2012-09-01

    Primary chemistry controls continue to evolve, impacting long term equipment reliability goals, optimized core designs, and radiation dose management practices. Chemistry initiatives include increased primary system pH (T) , zinc injection, and optimization of primary system hydrogen concentration. Nevertheless, utilities are faced with ever changing challenges as fuel vendors continue to optimize core power densities coupled with longer operating cycles and material replacement efforts. These challenges must be collaboratively addressed by the plant chemists, engineers, and operators. Operational chemistry has changed dramatically over the years with increased primary pH (T) programs requiring some utilities to operate with up to 6 ppm lithium or slightly higher. Coupled with primary pH (T) program optimization, are ongoing EPRI research efforts attempting to develop an optimized hydrogen control program balancing material issues associated with primary water stress corrosion cracking (PWSCC) crack growth rate against fuel concerns associated with increased hydrogen concentrations. One of the most significant primary chemistry changes that effectively balances the demands of materials, fuels, chemistry and dose management strategies is zinc injection into the primary coolant. Since 1994 when Farley initiated zinc injection, zinc injection has been successfully injected at over 70 pressurized water reactors world-wide. Combining operational chemistry with shutdown chemistry controls provides the plant chemist with a technically based and balanced approach to fuel and material integrity as well as dose management strategies. Shutdown chemistry has continually evolved since the 1970's when the chemist was primarily concerned with fission products. Now the chemist must manage corrosion product release, and support Outage Management and Radiation Protection through the performance of a controlled shutdown. In part, this change was driven as plant materials evolved

  3. Qualification criteria to certify a package for air transport of plutonium

    International Nuclear Information System (INIS)

    1977-12-01

    The document describes qualification criteria developed by the U.S. Nuclear Regulatory Commission to certify a package for air transport of plutonium. Included in the document is a discussion of aircraft accident conditions and a summary of the technical basis for the qualification criteria. The criteria require prototype packages to be subjected to various individual and sequential tests that simulate the conditions produced in severe aircraft accidents. Specific post-test acceptance standards are prescribed for each of the three safety functions of a package. The qualification criteria also prescribe certain operational controls to be exercised during transport

  4. QUALIFICATIONS FRAMEWORK DEVELOPMENT AND QUALIFICATIONS RATING IN THE LAND MANAGEMENT SPHERE

    Directory of Open Access Journals (Sweden)

    A. A. Myrasheva

    2014-01-01

    Full Text Available The aim of the research is to observe the existing approaches to qualifications framework development in the sphere of land management, cadastres and real estate management, as well as the qualifications framework adaptation to European system. The relevance of the issue is related to the specific professional and institutional problems facing Russian educational establishments engaged in personnel training in the given sphere. The authors demonstrate the qualifications framework development in the land management sector regarding it as a key mechanism of educational mobility and the router for knowledge acquisition and updates. The qualifications framework is referred to as a systematic and structured description of recognized qualifications. The accepted worldwide methodology of organizing the educational process and quality control system is given. The emphasis is on the need to comply the qualifications framework with the Russian State Educational Standards.

  5. Inspector qualification guidelines

    International Nuclear Information System (INIS)

    Batty, A.C.; Van Binnebeek, J.J.; Ericsson, P.O.; Fisher, J.C.; Geiger, P.; Grandame, M.; Grimes, B.K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-01

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied

  6. Inspector qualification guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Batty, A. C.; Van Binnebeek, J. J.; Ericsson, P. O.; Fisher, J. C.; Geiger, P.; Grandame, M.; Grimes, B. K.; Joode, A. de; Kaufer, B.; Kinoshita, M.; Klonk, H.; Koizumi, H.; Maeda, N.; Maqua, M.; Perez del Moral, C.; Roselli, F.; Warren, T.; Zimmerman, R.

    1994-07-15

    The OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities (CNRA) has a Working Group on Inspection Practices (WGIP). The WGIP provides a forum for the exchange of Information and experience on the safety Inspection practices of regulatory authorities In the CNRA member countries. A consistent qualification process and well defined level of training for all Inspectors who participate In the safety Inspections are needed to provide consistent Inspections and reliable Inspection results. The WGIP organized in 1992 a workshop on the conduct of inspections, inspector qualification and training, and shutdown inspections at the Technical Training Center of the US NRC in Chattanooga, Tennessee. In the connection of workshop the WGIP identified a need to develop guidance for inspector qualification which could be used as a model by those who are developing their qualification practices. The inspector qualification journals of US NRC provided a good basis for the work. The following inspector qualification guideline has been developed for guidance of qualification of a new inspector recruited to the regulatory body. This guideline has been developed for helping the supervisors and training officers to give the initial training and familiarization to the duties of a new inspector in a controlled manner. US NRC inspector qualification journals have been used to define the areas of attention. This guideline provides large flexibility for application in different type organizations. Large organizations can develop separate qualification journals for each inspector positions. Small regulatory bodies can develop individual training programmes by defining the necessary training topics on case by case basis. E.g. the guideline can be used to define the qualifications of contracted inspectors used in some countries. The appropriate part would apply. Annex 1 gives two examples how this guideline could be applied.

  7. Compressed-air energy storage: Commercialization potential and EPRI roles in the commercialization process

    Science.gov (United States)

    Boyd, D. W.; Buckley, O. E.; Clark, C. E.

    1982-12-01

    This report describes an assessment of potential roles that EPRI might take to facilitate the commercial acceptance of compressed air energy storage (CAES) systems. The assessment is based on (1) detailed analyses of the market potential of utility storage technologies, (2) interviews with representatives of key participants in the CAES market, and (3) a decision analysis synthesizing much of the information about market and technology status. The results indicate a large potential market for CAES systems if the overall business environment for utilities improves. In addition, it appears that EPRI can have a valuable incremental impact in ensuring that utilities realize the potential of CAES by (1) continuing an aggressive information dissemination and technology transfer program, (2) working to ensure the success of the first United States CAES installation at Soyland Power Cooperative, (3) developing planning methods to allow utilities to evaluate CAES and other storage options more effectively and more realistically, and (4) supporting R and D to resolve residual uncertainties in first-generation CAES cost and performance characteristics.

  8. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Among these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.

  9. 1E Qualification of Electrical Equipment - Requirement for Safety Nuclear Power Plants

    International Nuclear Information System (INIS)

    Geambasu, C.; Segarceanu, D.; Albu, J.

    2002-01-01

    The paper presents the qualification methods of the safety related equipment according to the safety class 1E. There are presented the qualification principles, procedure and documents, emphasis being laid on the qualification approach by type tests. This approach assumes the equipment test under both normal and accident conditions (design basis events) simulating the operational conditions and covers the largest part of electrical equipment from a nuclear power plant.The safety related equipment is to be qualified is subjected to a sequential test that will be detailed in the paper. (author)

  10. Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

    International Nuclear Information System (INIS)

    Lessard, Leo; Kay, Jim; Lefrancois, Donald; Furr, Richard; Lucas, Matthieu; Schauer, Konrad

    2016-01-01

    Industry models for planning the efficient decommissioning of a nuclear power plant continue to evolve. Effective planning is a key to cost control, a critical aspect of decommissioning. In 2001, the Electric Power Research Institute (EPRI) published the 'Decommissioning Pre-Planning Manual', referred to as the 'Manual'. The goal of the Manual was to develop a framework for use in pre-planning the decommissioning of a nuclear power plant. The original research was based on information collected during the active decommissioning of power reactors in New England, and the ongoing decommissioning planning of another reactor still in operation. The research team identified thirty-two (32) major Decommissioning Tasks that support the strategic and tactical planning that can be conducted in advance of plant shutdown. The Decommissioning Tasks were organized in a logical sequence of execution, and sorted in common discipline groupings. Owners of U.S. nuclear plants that have shut down prematurely during the past 5 years have found the EPRI Decommissioning Pre-Planning Manual useful in developing their transition plans from an operating to shutdown facility. Concurrently, during the past 15 years, the IAEA has published numerous technical and safety reports on nuclear reactor decommissioning planning and execution. IAEA's goal is to provide its global members with useful and timely guidance for the planning and execution of nuclear decommissioning projects. This information has been used extensively by international nuclear plant operators. One of the key objectives will be to develop a road-map linking the 32 EPRI Decommissioning Tasks with the comparable (or equivalent) topics covered in the IAEA library of decommissioning knowledge. The logical and convenient structure of the Manual will be cross-referenced to the IAEA topics to aid in organizing the development of decommissioning plans. The road-map will serve to provide a basis for improved

  11. Risk Assessment of the Main Control Room Fire Using Fire Simulations

    International Nuclear Information System (INIS)

    Kang, Dae Il; Kim, Kilyoo; Jang, Seung Cheol

    2013-01-01

    KAERI is performing a fire PSA for a reference plant, Ulchin Unit 3, as part of developing the Korean site risk profile (KSRP). Fire simulations of the MCR fire were conducted using the CFAST (Consolidated Fire Growth and Smoke Transport) model and FDS (fire dynamic simulator) to improve the uncertainty in the MCR fire risk analysis. Using the fire simulation results, the MCR abandonment risk was evaluated. Level 1 PSA (probabilistic safety assessment) results of Ulchin Unit 3 using the EPRI PRA (probabilistic risk assessment) implementation guide showed that the MCR (main control room) fire was the main contributor to the core damage frequency. Recently, U. S. NRC and EPRI developed NUREG/CR-6850 to provide state-of-the-art methods, tools, and data for the conduct of a fire PSA for a commercial NPP

  12. PWR water chemistry controls: a perspective on industry initiatives and trends relative to operating experience and the EPRI PWR water chemistry guidelines

    International Nuclear Information System (INIS)

    Fruzzetti, K.; Choi, S.; Haas, C.; Pender, M.; Perkins, D.

    2010-01-01

    An effective PWR water chemistry control program must address the following goals: Minimize materials degradation (e.g., PWSCC, corrosion of fuel, corrosion damage of steam generator (SG) tubes); Maintain fuel integrity and good performance; Minimize corrosion product transport (e.g., transport and deposition on the fuel, transport into the SGs where it can foul tube surfaces and create crevice environments for the concentration of corrosive impurities); Minimize dose rates. Water chemistry control must be optimized to provide overall improvement considering the sometimes variant constraints of the goals listed above. New technologies are developed for continued mitigation of materials degradation, continued fuel integrity and good performance, continued reduction of corrosion product transport, and continued minimization of plant dose rates. The EPRI chemistry program, in coordination with other EPRI programs, strives to improve these areas through application of chemistry initiatives, focusing on these goals. This paper highlights the major initiatives and issues with respect to PWR primary and secondary system chemistry and outlines the recent, on-going, and proposed work to effectively address them. These initiatives are presented in light of recent operating experience, as derived from EPRI's PWR chemistry monitoring and assessment program, and EPRI's water chemistry guidelines. (author)

  13. WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Hanford Missions Programs; Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Process Technology Programs; Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development; Edwards, T. B. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL). Engineering Process Development

    2016-07-14

    The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the process demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the

  14. Evaluation of leak rate by EPRI code

    International Nuclear Information System (INIS)

    Isozaki, Toshikuni; Hashiguchi, Issei; Kato, Kiyoshi; Miyazono, Shohachiro

    1987-08-01

    From 1987, a research on the leak rate from a cracked pipe under BWR or PWR operating condition is going to be carried out at the authors' laboratory. This report describes the computed results by EPRI's leak rate code which was mounted on JAERI FACOM-M380 machine. Henry's critical flow model is used in this program. For the planning of an experimental research, the leak rate from a crack under BWR or PWR operating condition is computed, varying a crack length 2c, crack opening diameter COD and pipe diameter. The COD value under which the minimum detectable leak rate of 5 gpm is given is 0.22 mm or 0.21 mm under the BWR or PWR condition with 2c = 100 mm and 16B pipe geometry. The entire lists are shown in the appendix. (author)

  15. Seismic qualification of equipment

    International Nuclear Information System (INIS)

    Heidebrecht, A.C.; Tso, W.K.

    1983-03-01

    This report describes the results of an investigation into the seismic qualification of equipment located in CANDU nuclear power plants. It is particularly concerned with the evaluation of current seismic qualification requirements, the development of a suitable methodology for the seismic qualification of safety systems, and the evaluation of seismic qualification analysis and testing procedures

  16. Characteristics Testing of the ECT Bobbin Probe for S/G Tube Inspection

    Energy Technology Data Exchange (ETDEWEB)

    Nam, Min Woo; Lee, Hee Jong; Cho, Chan Hee; Yoo, Hyun Joo [Korea Electric Power Research Institute, Daejeon (Korea, Republic of)

    2010-05-15

    The bobbin probe technique is basically one of the important ECT methods for the steam generator tube integrity assessment that is practiced during each plant outage. The bobbin probe also is the essential component which consists of the whole ECT examination system, and provides a decisive data for the evaluation of tube integrity in compliance with acceptance criteria described in specific procedures. The selection of probe is especially important because the quality of acquired ECT data is determined by the probe design characteristics, such as geometry and operation frequency, and has an important effect on examination results. The Electric Power Research Institute (EPRI) has recently defined the procedures for the qualification of eddy current hardware and technique. These procedures provide two basic methods for qualification. Flawed tube removed from operation, or artificial flaw is required for the original qualification of technique combined with related flaw mechanism. In case where the original qualification has been completed, the concept of equivalency may be used to extend the original qualification to similar probe designs. The qualified acquisition technique may be modified to substitute or replace instruments or probes without re-qualification provided that the range of essential variables defined in the examination technique specification sheet are met. In this case, both the original and replaced instrument or probe shall be characterized utilizing EPRI Guideline supplement 'H1'. This study is the result of the comparative performance evaluation of bobbin coil eddy current probes manufactured by KEPRI and a foreign manufacturer. As a result of this study, although there were minor differences between the two probe types, it was evaluated that the two probes were almost identical in the significant performance characteristics described in the EPRI guideline

  17. INEL design studies in support of the Westinghouse EPRI small plant study

    International Nuclear Information System (INIS)

    Burtt, J.D.; Kullberg, C.M.

    1986-03-01

    In support of the design effort of a Westinghouse EPRI small plant study, several analyses were performed at the Idaho National Engineering Laboratory. An analysis was performed to study fuel behavior under conditions of a limiting flow coastdown transient. Depressurization capabilities for the reactor coolant system were studied. The post-accident heat removal for the current containment design was studied. The results of all three studies are reported. 31 figs

  18. Qualification of the AUTOBUS Mod. 2 Code

    International Nuclear Information System (INIS)

    Ciarniello, U.; Peroni, P.

    1988-01-01

    The paper presents the qualification of AUTOBUS MOD.2 code. After a brief description of the code itself, all the critical experiments simulated by the code are illustrated to prove the accuracy of criticality calculation and power distribution. An interpretation of the results and a conclusion close this presentation

  19. Thermography During Thermal Test of the Gaia Deployable Sunshield Assembly Qualification Model in the ESTEC Large Space Simulator

    Science.gov (United States)

    Simpson, R.; Broussely, M.; Edwards, G.; Robinson, D.; Cozzani, A.; Casarosa, G.

    2012-07-01

    The National Physical Laboratory (NPL) and The European Space Research and Technology Centre (ESTEC) have performed for the first time successful surface temperature measurements using infrared thermal imaging in the ESTEC Large Space Simulator (LSS) under vacuum and with the Sun Simulator (SUSI) switched on during thermal qualification tests of the GAIA Deployable Sunshield Assembly (DSA). The thermal imager temperature measurements, with radiosity model corrections, show good agreement with thermocouple readings on well characterised regions of the spacecraft. In addition, the thermal imaging measurements identified potentially misleading thermocouple temperature readings and provided qualitative real-time observations of the thermal and spatial evolution of surface structure changes and heat dissipation during hot test loadings, which may yield additional thermal and physical measurement information through further research.

  20. Hybrid Qualifications

    DEFF Research Database (Denmark)

    Against the background of increasing qualification needs there is a growing awareness of the challenge to widen participation in processes of skill formation and competence development. At the same time, the issue of permeability between vocational education and training (VET) and general education...... has turned out as a major focus of European education and training policies and certainly is a crucial principle underlying the European Qualifications Framework (EQF). In this context, «hybrid qualifications» (HQ) may be seen as an interesting approach to tackle these challenges as they serve «two...

  1. Experimental determination of the radial dose distribution in high gradient regions around 192Ir wires: Comparison of electron paramagnetic resonance imaging, films, and Monte Carlo simulations

    International Nuclear Information System (INIS)

    Kolbun, N.; Leveque, Ph.; Abboud, F.; Bol, A.; Vynckier, S.; Gallez, B.

    2010-01-01

    Purpose: The experimental determination of doses at proximal distances from radioactive sources is difficult because of the steepness of the dose gradient. The goal of this study was to determine the relative radial dose distribution for a low dose rate 192 Ir wire source using electron paramagnetic resonance imaging (EPRI) and to compare the results to those obtained using Gafchromic EBT film dosimetry and Monte Carlo (MC) simulations. Methods: Lithium formate and ammonium formate were chosen as the EPR dosimetric materials and were used to form cylindrical phantoms. The dose distribution of the stable radiation-induced free radicals in the lithium formate and ammonium formate phantoms was assessed by EPRI. EBT films were also inserted inside in ammonium formate phantoms for comparison. MC simulation was performed using the MCNP4C2 software code. Results: The radical signal in irradiated ammonium formate is contained in a single narrow EPR line, with an EPR peak-to-peak linewidth narrower than that of lithium formate (∼0.64 and 1.4 mT, respectively). The spatial resolution of EPR images was enhanced by a factor of 2.3 using ammonium formate compared to lithium formate because its linewidth is about 0.75 mT narrower than that of lithium formate. The EPRI results were consistent to within 1% with those of Gafchromic EBT films and MC simulations at distances from 1.0 to 2.9 mm. The radial dose values obtained by EPRI were about 4% lower at distances from 2.9 to 4.0 mm than those determined by MC simulation and EBT film dosimetry. Conclusions: Ammonium formate is a suitable material under certain conditions for use in brachytherapy dosimetry using EPRI. In this study, the authors demonstrated that the EPRI technique allows the estimation of the relative radial dose distribution at short distances for a 192 Ir wire source.

  2. A new high-strength iron base austenitic alloy with good toughness and corrosion resistance (GE-EPRI alloy-TTL)

    International Nuclear Information System (INIS)

    Ganesh, S.

    1989-01-01

    A new high strength, iron based, austenitic alloy has been successfully developed by GE-EPRI to satisfy the strength and corrosion resistance requirements of large retaining rings for high capacity generators (>840Mw). This new alloy is a modified version of the EPRI alloy-T developed by the University of California, Berkeley, in an earlier EPRI program. It is age hardenable and has the nominal composition (weight %): 34.5 Ni, 5Cr, 3Ti, 1Nb, 1Ta, 1Mo, .5Al, .3V, .01B. This composition was selected based on detailed metallurgical and processing studies on modified versions of alloy-T. These studies helped establish the optimum processing conditions for the new alloy and enabled the successful scale-up production of three large (50-52 inch dia) test rings from a 5,000 lb VIM-VAR billet. The rings were metallurgically sound and exhibited yield strength capabilities in the range 145 to 220 ksi depending on the extent of hot/cold work induced. The test rings met or exceeded all the property goals. The above alloy can provide a good combination of strength, toughness and corrosion resistance and, through an suitable modification of chemistry or processing conditions, could be a viable candidate for high strength LWR internal applications. 3 figs

  3. Using the EPRI Risk-Informed ISI Methodology on Piping Systems in Forsmark 3

    International Nuclear Information System (INIS)

    O'Regan, Patrick; Moody, Jim; Loetman, Jan; Sandstedt, Johan

    2010-12-01

    The objective of this project was a pilot plant demonstration of the EPRI RI-ISI Methodology to selected systems at Forsmark, Unit 3 (F3). This scope of this study encompasses five systems and is based upon F3 implementation of SKIFs guidance as well as other consideration as documented in the PMT program. As described in section 2, five systems were selected for evaluation. These systems were selected because they allow this project to focus on a number of issues of interest in developing a RI-ISI methodology and RI-ISI program. This includes the following: - Several different types of degradation may be identified, - Several different types of 'consequence of failure' may be identified, - Different types of safety systems are evaluated - Non-safety systems are evaluated Using the results of this application, insights and comparisons between SKIFS and the EPRI methodologies' are provided including the following: - Consequence of pressure boundary failure (PBF) as described in Section 3.14. - Degradation mechanism evaluation as described in Section 4.8. - Risk ranking as described in Section 5. - Element selection for inspection as described in Section 6. - Risk impact as described in Section 7

  4. Using the EPRI Risk-Informed ISI Methodology on Piping Systems in Forsmark 3

    Energy Technology Data Exchange (ETDEWEB)

    O' Regan, Patrick (Electric Power Research Inst., Knoxville, TN (United States)); Moody, Jim (JHM Consulting, Strafford (United States)); Loetman, Jan (Forsmarks Kraftgrupp AB (Sweden)); Sandstedt, Johan (Risk Pilot AB, Stockholm (Sweden))

    2010-12-15

    The objective of this project was a pilot plant demonstration of the EPRI RI-ISI Methodology to selected systems at Forsmark, Unit 3 (F3). This scope of this study encompasses five systems and is based upon F3 implementation of SKIFs guidance as well as other consideration as documented in the PMT program. As described in section 2, five systems were selected for evaluation. These systems were selected because they allow this project to focus on a number of issues of interest in developing a RI-ISI methodology and RI-ISI program. This includes the following: - Several different types of degradation may be identified, - Several different types of 'consequence of failure' may be identified, - Different types of safety systems are evaluated - Non-safety systems are evaluated Using the results of this application, insights and comparisons between SKIFS and the EPRI methodologies' are provided including the following: - Consequence of pressure boundary failure (PBF) as described in Section 3.14. - Degradation mechanism evaluation as described in Section 4.8. - Risk ranking as described in Section 5. - Element selection for inspection as described in Section 6. - Risk impact as described in Section 7

  5. EPRI Guidance for Transition from Operations to Decommissioning

    International Nuclear Information System (INIS)

    McGrath, Richard; Reid, Richard; Snyder, Michael

    2016-01-01

    A wide range of key activities are necessary after permanent shutdown of a nuclear power plant before active dismantlement of the plant can begin. This period is typically referred to as the transition period. In some cases these activities are prescribed by regulation and in others they may be more practically driven or even optional. In either case, planning for transition activities should optimally take place prior to final shutdown. Additionally, execution of some transition period activities, such as filing required regulatory submittals, may be performed prior to plant shut down. In addition to general transition period activities such as defueling, management of operational wastes, fulfilling regulatory requirements and changes to plant technical specifications, there are a number of optional activities that may have a long-range impact on future decommissioning activities. This includes activities such as the timing of staff reductions and performance of chemical decontamination. EPRI is nearing completion of a project to develop guidance for transitioning a nuclear power plant to decommissioning. This project includes the following elements: - A review of required and recommended transition period activities. For countries where a clear regulatory framework exists, this includes country-specific requirements; - A review of pending regulatory activities in the US and other countries where there is currently no clear regulatory framework for transitioning to decommissioning; - A summary of activities that have been performed during the transition period for past and current decommissioning sites, as well as current sites that are actively planning decommissioning activities; and - Guidance for development of a transition plan for changing from an operational to decommissioning status. Informed planning of the transition period activities will provide immediate benefits in reducing costs and minimizing the duration of the transition period, as well as longer

  6. TOUGH2 software qualification

    Energy Technology Data Exchange (ETDEWEB)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM ({open_quotes}MULti-KOMponent{close_quotes}) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2.

  7. TOUGH2 software qualification

    International Nuclear Information System (INIS)

    Pruess, K.; Simmons, A.; Wu, Y.S.; Moridis, G.

    1996-02-01

    TOUGH2 is a numerical simulation code for multi-dimensional coupled fluid and heat flow of multiphase, multicomponent fluid mixtures in porous and fractured media. It belongs to the MULKOM (open-quotes MULti-KOMponentclose quotes) family of codes and is a more general version of the TOUGH simulator. The MULKOM family of codes was originally developed with a focus on geothermal reservoir simulation. They are suited to modeling systems which contain different fluid mixtures, with applications to flow problems arising in the context of high-level nuclear waste isolation, oil and gas recovery and storage, and groundwater resource protection. TOUGH2 is essentially a subset of MULKOM, consisting of a selection of the better tested and documented MULKOM program modules. The purpose of this package of reports is to provide all software baseline documents necessary for the software qualification of TOUGH2

  8. Australian Qualifications Framework Lower-Level Qualifications: Pathways to Where for Young People?

    Science.gov (United States)

    Stanwick, John

    2005-01-01

    This study investigates where certificate I and II qualifications lead young people aged 15-24 years in terms of employment and further study. A prime motivation for young people undertaking these qualifications is to facilitate transition into the labour market. These qualifications are aimed at developing basic vocational skills or preparatory…

  9. EPRI's on-site soil-structure interaction research and its application to design/analysis verification

    Energy Technology Data Exchange (ETDEWEB)

    Stepp, J C; Tang, H T [Seismic Center, Electric Power Research Institute, Palo Alto, CA (United States)

    1988-07-01

    Soil structure, interaction (SSI) research at the Electric Power Research Institute (EPRI) is focused on validating modeling and computational procedures. A data base has been obtained with instrumented scale models of stiff structures founded both on unsaturated alluvial soils and on rock. Explosives were used to induce strong ground-motion for two experiments, one on rock and the other on alluvium. A third experiment, a one-fourth scale containment structure on saturated alluvium, relies on earthquakes as the energy source. Analysis of the explosion-induced SSI data shows a marked shift in the fundamental frequency of the soil-structure system to a lower frequency. The magnitude of the shift is a function of foundation conditions and level of excitation. Analytical simulation was found to require more sophisticated soil constitutive models and computer codes than are used in current practice. The current phase of the program concentrates on evaluating SSI models used in current design practice by comparing predicted with recorded data at points in the soil-structure system. (author)

  10. EPRI's on-site soil-structure interaction research and its application to design/analysis verification

    International Nuclear Information System (INIS)

    Stepp, J.C.; Tang, H.T.

    1988-01-01

    Soil structure, interaction (SSI) research at the Electric Power Research Institute (EPRI) is focused on validating modeling and computational procedures. A data base has been obtained with instrumented scale models of stiff structures founded both on unsaturated alluvial soils and on rock. Explosives were used to induce strong ground-motion for two experiments, one on rock and the other on alluvium. A third experiment, a one-fourth scale containment structure on saturated alluvium, relies on earthquakes as the energy source. Analysis of the explosion-induced SSI data shows a marked shift in the fundamental frequency of the soil-structure system to a lower frequency. The magnitude of the shift is a function of foundation conditions and level of excitation. Analytical simulation was found to require more sophisticated soil constitutive models and computer codes than are used in current practice. The current phase of the program concentrates on evaluating SSI models used in current design practice by comparing predicted with recorded data at points in the soil-structure system. (author)

  11. Design and Validation of Control Room Upgrades Using a Research Simulator Facility

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring; Vivek Agarwal; Jeffrey C. Joe; Julius J. Persensky

    2012-11-01

    Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

  12. EPRI/Alberta Research Council Clean Soil Process

    International Nuclear Information System (INIS)

    Spear, C.E.

    1992-12-01

    The EPRI/Alberta Research Council Clean Soil Process can remove hydrocarbon contamination from waste material from manufactured gas plants. The process uses coal as an absorbent to remove hydrocarbons. For petroleum contaminated soils, the process can bring residual concentration of petroleum below 0.1 percent and polycyclic aromatic hydrocarbon (PAH) concentration to 1--5 ppM. For coal tar contaminated soils, the process can reduce tar concentrations to about 0.05-0.5 percent and the PAH concentration to about 10--60 ppM. Additional post-treatment may be required for some precleaned soils. The process yields by-product agglomerates suitable for combustion in industrial boilers. Light hydrocarbons such as benzene are vaporized from the soil, condensed and collected in the Process and disposed of off-site. The Clean Soil Process has been tested at pilot-plant scale. A conceptual design for a 200-tons-per-day plant yielded a capital cost estimated at $3.1 million with a per-ton operating cost of $40

  13. The DWPF waste form qualification program

    International Nuclear Information System (INIS)

    Marra, S.L.; Plodinec, M.J.

    1994-01-01

    Prior to the introduction of radioactive feed into the Defense Waste Processing Facility for immobilization in borosilicate glass an extensive waste qualification program must be completed. The DWPF must demonstrate its ability to comply with the Waste Acceptance Product Specifications. This ability is being demonstrated through laboratory and pilot scale work and will be completed after the full operation of the DWPF using various simulated feeds

  14. 4-th EPRI International conference on the water chemistry of the organic-fuel thermal power plants

    International Nuclear Information System (INIS)

    Petrova, T.I.; Martynova, O.I.

    1995-01-01

    Most actual problems on thermal power engineering are discussed at EPRI conferences on organic fuel, conducted every two years. Experience in realization of economically beneficial, ecologically feasible modes and their monitoring, accumulated in recent years, was formulated at the 4-th conference with wide participation

  15. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2000-01-01

    In 1999 the Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on the overall training system and on developing programmes for individual categories for NPP V-1 Bohunice, NPP V-2 Bohunice, NPP Mochovce and SE-VYZ. The fundamental theoretical and periodical training for both Bohunice and Mochovce NPPs personnel, simulator training for NPP Bohunice, and periodical simulator training for Bohunice personnel is carried out by the VUJE Training center in Trnava, whereas the simulator training and periodical training for NPP Mochovce is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues, a certificate on special professional skills of selected staff of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: (a)Shift manager for scientific start up with the right of manipulation; (b) Shift supervisor; (c) Unit supervisor; (d) Primary circuit operator; (e) Secondary circuit operator; (f) Reactor physicist; (g) Shift manager for scientific start up without the right of manipulation. Examination of selected personnel is described. Last year the examining committee held twelve session for oral theoretical examination. The number of licenses issued in 1999 and the total number of valid licenses is given.Conclusions from inspections carried out by UJD and inspections and tests carried out by the NPP operators in 1999, as well as results from operation and start up of nuclear units confirm that the standard of professional skills of the staff at nuclear installations a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for the staff for 1999. These training, composed of specialized qualification study, functional study, as well as study aimed at maintaining qualification. Training courses organized

  16. Actual waste demonstration of the nitric-glycolic flowsheet for sludge batch 9 qualification

    Energy Technology Data Exchange (ETDEWEB)

    Newell, D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Pareizs, J. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Martino, C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Reboul, S. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Coleman, C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Edwards, T. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Johnson, F. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-03-09

    For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch is processable. Based on the results of this actual-waste qualification and previous simulant studies, SRNL recommends implementation of the nitric-glycolic acid flowsheet in DWPF. Other recommendations resulting from this demonstration are reported in section 5.0.

  17. Improvements to the COBRA-TF (EPRI) computer code for steam generator analysis. Final report

    International Nuclear Information System (INIS)

    Stewart, C.W.; Barnhart, J.S.; Koontz, A.S.

    1980-09-01

    The COBRA-TF (EPRI) code has been improved and extended for pressurized water reactor steam generator analysis. New features and models have been added in the areas of subcooled boiling and heat transfer, turbulence, numerics, and global steam generator modeling. The code's new capabilities are qualified against selected experimental data and demonstrated for typical global and microscale steam generator analysis

  18. Verification of the pollutant transport model 'MODIS' using EPRI plains site data from a tall stack

    Energy Technology Data Exchange (ETDEWEB)

    Petersen, G; Eppel, D; Grassl, H

    1988-01-01

    A comprehensive numerical model for the simulation of pollutant dispersion from a point source into the mixing layer of the atmosphere over flat terrain is described. A moment reduction technique is used (MODIS = Moment Distribution) to combine the simplicity of the Gaussian plume description with the versatility of Eulerian grid formulations. Turbulent dispersion coefficients are parameterized in terms of mean square wind variances which in turn are obtained by a simplified second order closure model. The data base of the 'EPRI Plume Model Validation and Development Project' is used to validate the model for wind velocities above 0.5 m/s and for horizontal scales up to about one hundred kilometers. The model describes the three-dimensional structure of a plume also for stable conditions including a nighttime low level jet. For a convective planetary boundary layer it underestimates maximum ground concentration as do other models. However, it is capable of approaching measured maximum ground concentration under stable conditions.

  19. Seismic qualification of the rotary relay for use in the solid state protection system

    International Nuclear Information System (INIS)

    Vogeding, E.L.; Jarecki, S.J.

    1976-01-01

    The seismic qualification of a rotary relay that can be used as a replacement for the type of relay located in the output section of the Solid State Protection System is described. The qualification test results indicate that the tested relays did not exhibit any contact bounce or abnormal operation; they performed satisfactorily before, during, and after the simulated seismic vibration tests

  20. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

      When, in a competitive sphere, people are selected on the basis of qualifications only, their chances of acquiring positions of advantage may seem to depend entirely upon their abilities, not discriminatory bias. However, if reaction qualifications - i.e. characteristics which contribute...... to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... of merit. Specifically, it preserves symmetry between negative evaluations of antimeritocratic bases of selection and negative evaluations of qualifications rooted in comparable antimeritocratic reactions. So if employers should not select among applicants on the basis of their (the employers') racial...

  1. Overview of nuclear power plant equipment qualification issues and practices

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report presents a view of and commentary on the current status of equipment qualification (EQ) in nuclear industries of the major western nations. The introductory chapters discuss the concepts of EQ, the elements of EQ process and highlight some of the key issues in EQ. A brief review of industry practices and some of the prevalent industrial standards is presented, followed by an overview of current regulatory positions in the USA, France, Germany and Sweden. A summary and commentary on the latest research findings on issues relating to accident simulation, to aging simulation and some special topics related to EQ, has been contributed by Franklin Research Centre of Philadelphia. The last part of the report deals with equipment qualification in Canada and gives recommendations on EQ for new plants as well as currently operational CANDU nuclear power plants

  2. 'Outside the box thinking': An overview of an environmental qualification test from a test lab perspective

    International Nuclear Information System (INIS)

    Mitton, T.

    2004-01-01

    Most people in the nuclear Environmental Qualification (EQ) business know that the basis for qualification ultimately lies with an equipment's successful operation during and after exposure to a simulated harsh environment. As opposed to focusing specifically on the test results of an Environmental Qualification test program, this paper/presentation will offer a more detailed look at the mechanical, electrical and thermodynamic requirements as well as the project difficulties and solutions of one such project - particularly an extensive, large-scale, non-typical project. (author)

  3. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  4. Demonstration for the Applicability of the EPRI ETSS on the SG Tube Wear Defects Formed at the Tube Support Structure

    International Nuclear Information System (INIS)

    Shin, Ki Seok; Cheon, Keun Young; Nam, Min Woo; Min, Kyong Mahn

    2013-01-01

    In this paper, the authorized EPRI ETSS 27906.2 applied to the detection of tapered wear volumetric indications and depth sizing within the free span area, loose part not present was reviewed and applied to the site SG tubes for getting the actual value of the wear depth and providing structural integrity interpretation based on engineering evaluation. The experiment to demonstrate the applicability of EPRI ETSS was performed by the employment of the newly prepared STD tube and resulted in ensuring the effectiveness and equivalency of the EPRI ETSS as well. The authorized EPRI ETSS 27906.2 for getting the actual value of the wear depth and providing structural integrity interpretation based on engineering evaluation was reviewed and applied to the site SG tubes. The testing results were reviewed with the influences of SG tube material and the support structure. The impact of the tube materials was insignificant and that of the tube support structure showed somewhat conservative results. The testing resulted in successful demonstration of applicability of the EPRI ETSS on the SG tube wear defects at the tube support. One of the major flaw mechanisms detected in the currently operating domestic OPR-1000 pressurized water reactors(PWR's) steam generator(SG) tubes is wear defect. In general, wear defect has been constantly detected in the upper tube bundle imposed to the flow induced vibration interaction between tube and its support structure, and the quantity of the affected tubes has also shown the tendency to increase as plant operation life is added. In order to take appropriate measures and maintain the structural integrity for the SG tubes, wear defect is currently categorized as active damage mechanism and the tubes containing 40% or greater wear depth of the nominal tube wall thickness shall be plugged per SGMP(SG Management Program) Recently, a fairly large amplitude of wear defects on the Batwing(BW), one of the upper tube support structures in the SG tubes

  5. Demonstration for the Applicability of the EPRI ETSS on the SG Tube Wear Defects Formed at the Tube Support Structure

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Ki Seok; Cheon, Keun Young; Nam, Min Woo [Korea Hydro and Nuclear Power Co. Ltd, Daejeon (Korea, Republic of); Min, Kyong Mahn [Universal Monitoring and Inspection Inc., Daejeon (Korea, Republic of)

    2013-10-15

    In this paper, the authorized EPRI ETSS 27906.2 applied to the detection of tapered wear volumetric indications and depth sizing within the free span area, loose part not present was reviewed and applied to the site SG tubes for getting the actual value of the wear depth and providing structural integrity interpretation based on engineering evaluation. The experiment to demonstrate the applicability of EPRI ETSS was performed by the employment of the newly prepared STD tube and resulted in ensuring the effectiveness and equivalency of the EPRI ETSS as well. The authorized EPRI ETSS 27906.2 for getting the actual value of the wear depth and providing structural integrity interpretation based on engineering evaluation was reviewed and applied to the site SG tubes. The testing results were reviewed with the influences of SG tube material and the support structure. The impact of the tube materials was insignificant and that of the tube support structure showed somewhat conservative results. The testing resulted in successful demonstration of applicability of the EPRI ETSS on the SG tube wear defects at the tube support. One of the major flaw mechanisms detected in the currently operating domestic OPR-1000 pressurized water reactors(PWR's) steam generator(SG) tubes is wear defect. In general, wear defect has been constantly detected in the upper tube bundle imposed to the flow induced vibration interaction between tube and its support structure, and the quantity of the affected tubes has also shown the tendency to increase as plant operation life is added. In order to take appropriate measures and maintain the structural integrity for the SG tubes, wear defect is currently categorized as active damage mechanism and the tubes containing 40% or greater wear depth of the nominal tube wall thickness shall be plugged per SGMP(SG Management Program) Recently, a fairly large amplitude of wear defects on the Batwing(BW), one of the upper tube support structures in the SG

  6. REGULATION OF NATIONAL QUALIFICATIONS SYSTEMS

    Directory of Open Access Journals (Sweden)

    Anna A. Muravyeva

    2014-01-01

    Full Text Available The paper looks into the diverse aspects of qualifications system regulation, designed for balancing the supply and demand in the labor and educational service markets. Both the objects and mechanisms of such regulation are described. Special attention is given to institutions, involved in regulation of qualifications, and their jurisdiction. Another emphasis is on the industry-related regulation of qualifications which proved to be effective both on the national and European level. Such structures were first established on the national levels to regulate the qualifications and ensure their comparability and compatibility, given the economic globalization and growing labor and academic mobility. The author points out the role of the ministries of education and labor in maintaining a steady qualifications system, and outlines the positive experience of Great Britain using the industry councils for continuing development of qualifications system.

  7. Training and qualification of nuclear power plant operators (4)

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2009-01-01

    Training center using the simulators, instructor training, training upgrade, deployment of digital control panel and review of training were described with overseas practice. Recently, nuclear power plant on-site simulators were also used for respective operator training. Operator teamwork training, training team performance upgrade, reflection of operating experiences in nuclear power plant accidents, development of training support equipments and management of training records were needed to review and upgrade training and qualification programs. (T. Tanaka)

  8. Applications of EPRI database on environmentally assisted cracking in the nuclear industry

    International Nuclear Information System (INIS)

    Rungta, R.; Mindlin, H.; Gilman, J.D.

    1986-01-01

    A computerized database, EPRI Database on Environmentally Assisted Cracking (EDEAC), has been established to assemble stress-corrosion cracking and corrosion fatigue crack growth data on materials of interest to nuclear power generation. The database is being used to review the basis for the existing ASME reference fatigue crack growth curves for low alloy ferritic steels used for reactor pressure vessels. Correlations between fatigue crack growth rate and stress intensity factor range with corrections for frequency, stress ratio, and temperature for austenitic stainless steels in air are also being developed

  9. Applications of EPRI database on environmentally assisted cracking in the nuclear industry

    International Nuclear Information System (INIS)

    Rungta, R.; Mindlin, H.; Gilman, J.D.

    1986-01-01

    A computerized database, EPRI Database on Environmentally Assisted Cracking (EDEAC), has been established to assemble stress corrosion cracking (SCC) and corrosion fatigue crack growth data on nuclear power generation industry materials. The database is currently used to review the basis for the existing ASME reference fatigue crack growth curves for low alloy ferritic steels used for reactor pressure vessels. Also, correlations between fatigue crack growth rate and stress intensity factor range with corrections for frequency, stress ratio, and temperature for austenitic stainless steels in air are being developed using the EDEAC

  10. Hydrogen water chemistry for BWRs: A status report on the EPRI development program

    International Nuclear Information System (INIS)

    Jones, R.L.; Nelson, J.L.

    1990-01-01

    Many BWRs have experienced extensive intergranular stress corrosion cracking (IGSCC) in their austenitic stainless steel coolant system piping, resulting in serious adverse impacts on plant capacity factors, O and M costs, and personnel radiation exposures. A major research program to provide remedies for BWR pipe cracking was co-funded by EPRI, GE, and the BWR Owners Group for IGSCC Research between 1979 and 1988. Results from this program show that the likelihood of IGSCC depends on reactor water chemistry (particularly on the concentrations of ionic impurities and oxidizing radiolysis products) as well as on material condition and the level of tensile stress. Tests have demonstrated that the concentration of oxidizing radiolysis products in the recirculating water of a BWR can be reduced substantially by injecting hydrogen into the feedwater. Recent plant data show that the use of hydrogen injection can reduce the rate of IGSCC to insignificant levels if the concentration of ionic impurities in the reactor water is kept sufficiently low. This approach to the control of BWR pipe cracking is called hydrogen water chemistry (HWC). This paper presents a review of the results of EPRI's HWC development program from 1980 to the present. In addition, plans for additional work to investigate the feasibility of adapting HWC to protect the BWR vessel and major internal components from potential stress corrosion cracking problems are summarized. (orig.)

  11. USDOE/EPRI BIOMASS COFIRING COOPERATIVE AGREEMENT

    International Nuclear Information System (INIS)

    D. Tillman; E. Hughes

    1999-01-01

    The Eleventh Quarter of the USDOE-EPRI contract, April 1, 1999 through June 30, 1999, was characterized by extensive testing at the Seward cofiring demonstration of GPU Genco and the Bailly Unit No.7 demonstration of NIPSCO. Technical work that proceeded during the eleventh quarter of the contract included the following: Testing at up to(approx)15 percent cofiring on a mass basis ((approx)7 percent cofiring on a Btu basis) at the Seward Generating Station No.12 boiler, focusing upon the operability of the separate injection system and the combustion/emission formation characteristics of the cofiring process; and Testing at up to(approx)10 percent cofiring of waste wood on a mass basis ((approx)5 percent cofiring on a Btu basis) at the Bailly Generating Station No.7 boiler, focusing upon the impacts of urban wood waste blended with a mixture of eastern high sulfur coal and western low sulfur coal Both tests demonstrated the following general, and expected, results from cofiring at these locations: (1) Cofiring did not impact boiler capacity; (2) Cofiring did cause a modest reduction in boiler efficiency; (3) Cofiring did reduce NOx emissions; (4) Cofiring did reduce fossil CO2 emissions; and (5) Other impacts of cofiring were modest

  12. The DWPF: Results of full scale qualification runs leading to radioactive operations

    International Nuclear Information System (INIS)

    Marra, S.L.; Elder, H.H.; Occhipinti, J.H.; Snyder, D.E.

    1996-01-01

    The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC will immobilize high-level radioactive liquid waste, currently stored in underground carbon steel tanks, in borosilicate glass. The radioactive waste is transferred to the DWPF in two forms: precipitate slurry and sludge slurry. The radioactive waste is pretreated and then combined with a borosilicate glass frit in the DWPF. This homogeneous slurry is fed to a Joule-heated melter which operates at approximately 1150 degrees C. The glass is poured into stainless steel canisters for eventual disposal in a geologic repository. The DWPF product (i.e. the canistered waste form) must comply with the Waste Acceptance Product Specifications (WAPS) in order to be acceptable for disposal. The DWPF has completed Waste Qualification Runs which demonstrate the facility's ability to comply with the waste acceptance specifications. During the Waste Qualification Runs seventy-one canisters of simulated waste glass were produced in preparation for Radioactive Operations. These canisters of simulated waste glass were produced during five production campaigns which also exercised the facility prior to beginning Radioactive Operations. The results of the Waste Qualification Runs are presented

  13. Extended used Fuel Storage: EPRI Perspective and Collaboration Initiatives

    International Nuclear Information System (INIS)

    Kessler, John; Waldrop, Keith

    2014-01-01

    This paper describes three main activities the Electric Power Research Institute (EPRI) is undertaking to establish the technical bases for extended (long-term) storage: the Extended Storage Collaboration Program (ESCP); inspection of stainless steel (SS) used fuel dry storage canisters currently in service; and a proposed data collection from a full-scale, bolted lid, metal cask containing high burnup (>45 GWd/MTU) used fuel (the 'Demo'). ESCP is a voluntary organization focused on information sharing and providing the opportunity for more formal collaboration. The SS canister inspection program involves visual examination, canister surface temperature measurements, and collection of contaminants accumulating on the canister surfaces during operation. The Demo program involves the use of a specially instrumented lid allowing for the introduction of thermocouples inside the loaded cask as was as providing the ability to collect cask cavity gas samples. (authors)

  14. A Parametric Study on Welding Process Simulation for Multi-pass welds in a Plate

    Energy Technology Data Exchange (ETDEWEB)

    Park, Won Dong; Bahn, Chi Bum; Kim, Ji Hun [Pusan National University, Busan (Korea, Republic of)

    2016-05-15

    EPRI (MRP-316, 317) (1,2) and USNRC (NUREG-2162)(3) have performed related studies for FEA models to predict the weld residual stress distribution. In this work, a systematic parametric study was performed to find out how major assumptions and conditions used in the simulation could affect the weld residual stress distribution. 2- dimensional simulation was conducted by using commercial FEA software, ABAQUS(4) , for multi-pass Alloy 82 welds performed in a stainless steel plate (EPRI MRP-316, P-4, phase 1). From the previous results, we could make the following conclusions. 1. The method of applying power density is more realistic than predefined temperature. 2. It seems that annealing effect reduces the transverse direction weld residual stress (S33). However more detailed analyses for annealing effect are needed.

  15. An analysis of the qualification criteria for small radioactive material shipping packages

    International Nuclear Information System (INIS)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described

  16. An analysis of the qualification criteria for small radioactive material shipping packages

    Energy Technology Data Exchange (ETDEWEB)

    McClure, J.D.

    1983-05-01

    The RAM package design certification process has two important elements, testing and acceptance. These terms sound very similar but they have specific meanings. Qualification testing in the context of this study is the imposition of simulated accident test conditions upon the candidate package design. (Normal transportation environments may also be included.) Following qualification testing, the acceptance criteria provide the performance levels which, if demonstrated, indicate the ability of the RAM package to sustain the severity of the qualification testing sequence and yet maintain specified levels of package integrity. This study has used Severities of Transportation Accidents as a data base to examine the regulatory test criteria which are required to be met by small packages containing Type B quantities of radioactive material (RAM). The basic findings indicate that the present regulatory test standards provide significantly higher levels of protection for the surface transportation modes (truck, rail) than for RAM packages shipped by aircraft. It should also be noted that various risk assessment studies have shown that the risk to the public due to severe transport accidents by surface and air transport modes is very low. A key element in this study was the quantification of the severity of the transportation accident environment and the severity of the present qualification test standards (called qualification test standards in this document) so that a direct comparison could be made between them to assess the effectiveness of the existing qualification test standards. The manner in which this was accomplished is described.

  17. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    The overall training system and the development projects of training the staff of all categories from NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce were the subject of UJD's attention. During 2001 following inspections were carried out on nuclear personnel training: - PP's Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff; - Mochovce NPP: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; - SE-VYZ: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff. Training the staff of the NPP's Bohunice: - The fundamental and periodical theoretical training as sure as the fundamental and periodical simulator training is carried out by the VUJE Training centre in Trnava. - The fundamental practical training in the workplace and training for the change work- rank is carried at Bohunice plant. Training of the staff of the NPP Mochovce: - The fundamental and periodical theoretical training is carried out by the VUJE Training centre in Trnava. The fundamental practical training in the workplace and training for the change work- rank as well as the fundamental and periodical simulator training is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues a certificate on special professional skills of selected staff members of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: 1. Scientific shift manager for start up with the right of manipulation; 2. Shift supervisor; 3. Unit supervisor; 4. Primary circuit operator; 5. Secondary circuit operator; 6. Reactor physicist; 7. Scientific shift manager for start up without the right of manipulation. Examinations of

  18. 5 CFR 302.403 - Qualifications for promotion.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications for promotion. 302.403... EMPLOYMENT IN THE EXCEPTED SERVICE Selection and Appointment; Reappointment; and Qualifications for Promotion § 302.403 Qualifications for promotion. In determining qualifications for promotion with respect to an...

  19. Proceedings: EPRI Workshop 2 -- Technical basis for EPA HLW disposal criteria

    International Nuclear Information System (INIS)

    Rogers, V.

    1993-03-01

    The Electric Power Research Institute (EPRI) sponsored this workshop to address the scientific and technical issues underlying the regulatory criteria, or standard, for the disposal of spent nuclear fuel, high-level radioactive waste, and transuranic waste, commonly referred to collectively as high-level waste (HLW). These regulatory criteria were originally promulgated by the US Environmental Protection Agency (EPA) in 40 CFR Part 191 in 1985. However, significant portions of the regulation were remanded by the Ninth Circuit Court of Appeals in 1987. This is the second of two workshops. Topics discussed include: gas pathway; individual and groundwater protection; human intrusion; population protection; performance; TRU conversion factors and discussions. Individual projects re processed separately for the databases

  20. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    International Nuclear Information System (INIS)

    Williams, Don

    2014-01-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation's electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy's (DOE) Office of Nuclear Energy [NE] and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE's Light Water Reactor Sustainability [LWRS] Program and EPRI's Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to @@@establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.@@@ This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  1. The french safety approach regarding equipment qualification

    International Nuclear Information System (INIS)

    Jalouneix, J.; Deletre, G.; Henry, J.Y.; Rousseau, L.

    1989-10-01

    The qualification of the equipment, used in France on nuclear reactors and reactor components, is discussed. The approach on safety involves the qualification of mechanical and electrical components, under operating and under seismic conditions. The principles of the qualification program and the list of the equipment concerned, are given. The conditions in which qualification tests are performed and the methods applied, are summarized. The actions for preserving the qualification procedures, are considered

  2. Liquid Secondary Waste Grout Formulation and Waste Form Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Um, Wooyong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Williams, B. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Snyder, Michelle M. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Guohui [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-05-23

    This report describes the results from liquid secondary waste (LSW) grout formulation and waste form qualification tests performed at Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions (WRPS) to evaluate new formulations for preparing a grout waste form with high-sulfate secondary waste simulants and the release of key constituents from these grout monoliths. Specific objectives of the LSW grout formulation and waste form qualification tests described in this report focused on five activities: 1.preparing new formulations for the LSW grout waste form with high-sulfate LSW simulants and solid characterization of the cured LSW grout waste form; 2.conducting the U.S. Environmental Protection Agency (EPA) Method 1313 leach test (EPA 2012) on the grout prepared with the new formulations, which solidify sulfate-rich Hanford Tank Waste Treatment and Immobilization Plant (WTP) off-gas condensate secondary waste simulant, using deionized water (DIW); 3.conducting the EPA Method 1315 leach tests (EPA 2013) on the grout monoliths made with the new dry blend formulations and three LSW simulants (242-A evaporator condensate, Environmental Restoration Disposal Facility (ERDF) leachate, and WTP off-gas condensate) using two leachants, DIW and simulated Hanford Integrated Disposal Facility (IDF) Site vadose zone pore water (VZPW); 4.estimating the 99Tc desorption Kd (distribution coefficient) values for 99Tc transport in oxidizing conditions to support the IDF performance assessment (PA); 5.estimating the solubility of 99Tc(IV)-bearing solid phases for 99Tc transport in reducing conditions to support the IDF PA.

  3. Environmental qualification program for new designs

    International Nuclear Information System (INIS)

    Doerffer, K.

    2007-01-01

    Qualification of nuclear power plant equipment and components important to safety (ITS) is an integral part of the design process. The qualification methodology differs based on the severity of service conditions (operational and ambient), to which the ITS equipment is exposed. In Canada, the licensing requirements for environmental qualification for new designs are governed by the Canadian Standard Association (CSA) standard, N290.13-2005 titled 'Environmental Qualification of Equipment for CANDU Nuclear Power Plants' and the pre-consultation draft, 'Requirements for Design of Nuclear Power Plants'(DRD), issued for trial use by the Canadian Nuclear Safety Commission (CNSC) in March 2005. This paper will describe AECL's current Environmental Qualification program developed to comply with the above licensing requirements as applied to new designs. The focus will be given to qualification of ITS systems structures and components (SSC) to harsh conditions occurring due to the Design Basis Accidents (DBA). (author)

  4. The impact of seismically-induced relay chatter on nuclear plant risk

    International Nuclear Information System (INIS)

    Bley, D.C.; McIntyre, T.J.; Smith, B.; Kassawara, R.P.

    1987-01-01

    This paper describes a systematic scheme for analyzing the impact of relay chatter that is amenable to both PRA analysis and seismic margins analysis. It uses knowledge of the systems engineering of the plant to bound the scope of the problem to a tractable size and has been applied to both the Diablo Canyon PRA and the EPRI seismic margines program trial evaluation at the Catawba Nuclear Power Plant. It has also been coordinated with similar EPRI-sponsored work on relay functionality for the Seismic Qualification Utility Group. (orig./HP)

  5. Overview of the IAEA's activity on ISI qualification

    International Nuclear Information System (INIS)

    Trampus, P.

    2000-01-01

    The IAEA Subprogram on Nuclear Power Planning, Implementation and Performance is presented. It's objective is to assist Member States in: planning nuclear power programmes in an integrated manner considering all necessary factors; systematically improving overall performance and competitiveness of NPPs trough entire service life with due regard to safety; applying technological/engineering best practices including QA/QM in all areas of nuclear power utilisation. International working group on life management of NPPs (IWG-LMNPP) has been established in 1975 with 26 Member States and 2 international organizations in order to provide the Director General with advice and opinions and the Member States with information, recommendations and support in life management issues.The technical co-operation program RER/4/020 'Advanced NDT of Primary Circuit Components' is presented.The pilot study is aimed to provide the participating Member States with practical advice how to apply the IAEA's qualification methodology. The target application is Technical Justification for UT of WWER-1000 RPV shell weld (unit 5 of 'Kozloduy NPP). The concept is to simulate the qualification process through assistance to establish qualification for a real NPP component, using real ISI, in a real regulatory environment. Interim results for Bulgaria are reported and further tasks are outlined

  6. 5 CFR 319.302 - Individual qualifications.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Individual qualifications. 319.302... Individual qualifications. Agency heads are delegated authority to approve the qualifications of individuals appointed to SL and ST positions. The agency head must determine that the individual meets the...

  7. VHDL basics applied design by SIPAC qualification system

    International Nuclear Information System (INIS)

    Park, In Ha; Mun, Da Cheol; Lee, Gwang Yeob

    2005-12-01

    This book has six chapters, which are about Flowrian of SIPAC qualification system including internet CAD system and remote server service, logic circuit on design and qualification of device such as gate circuit, multiplex and decoder, order logic circuit with D type flip-flop design and qualification and Rom and RAM's design and qualification, finite state machine such as odd checker, sequence detector, test clock generator and traffic light controller, design and qualification about data path, design of application circuit. It has two appendixes on install and the way to use SIPAC qualification system and remote service for SIPAC qualification system.

  8. List of BMFT, USNRC, EPRI, and STA reports on reactor safety research

    International Nuclear Information System (INIS)

    1980-07-01

    This list reviews reports from the Federal Republic of Germany, from the United States of America and from Japan concerning special problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the United States Nuclear Regulatory Commission (USNRC), the Electric Power Research Institute (EPRI), and the Japan Science and Technology Agency (JSTA) these reports are available in the Gesellschaft fuer Reaktorsicherheit. The list pursues the following order : Country of origin, problem area concerned, according to the Reactor Safety Research Program of BMFT, reporting organisation. The list of reports appears quarterly. (orig./HP) [de

  9. Nuclear power plant personnel entry level qualifications and training

    International Nuclear Information System (INIS)

    Jorgensen, C.C.; Haas, P.M.; Selby, D.L.; Lowry, J.C.

    1983-01-01

    This paper summarizes the early results and current status of a research program at ORNL which is intended to provide the methods and technical basis for NRC to initiate the use of the Systems Approach to Training (SAT) in the evaluation of training programs and entry level qualifications for NPP control room personnel. The program is an outgrowth of previous studies of simulator hardware and simulator training requirements under the Safety Related Operator Actions Program which recommended adaptation of a systems methodology to development and evaluation of NPP training programs

  10. Review of EPRI's steam generator R and D program

    International Nuclear Information System (INIS)

    Millett, P.J.; Welty, C.J.

    1998-01-01

    EPRI has carried out an extensive R and D program on SG technology since the mid 1970's. Very early efforts under the auspices of the Steam Generator Owners Group (SGOG) focused on developing remedial actions for the critical SG corrosion issues of denting, wastage and pitting. Fundamental work was also carried out in the development of thermal hydraulic models for vibration and wear, chemical cleaning and tube repair techniques. In the late 1980's and continuing through today, the program has shifted emphasis towards management of steam generator degradation, primarily stress corrosion cracking of the SG tubes on both the primary and secondary sides. The current Steam Generator Management Program (SGMP) carries out R and D in four areas; materials, chemistry, thermal hydraulics and non-destructive testing. The strategic goals of this program and projects put in place to achieve these goals will be reviewed in detail in this paper. (author)

  11. Proceedings: 1996 EPRI conference on innovative approaches to electricity pricing: Managing the transition to market-based pricing

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents the proceedings from the EPRI conference on innovative approaches to electricity pricing. Topics discussed include: power transmission pricing; retail pricing; price risk management; new pricing paradigms; changes from cost-based to a market-based pricing scheme; ancillary services; retail market strategies; profitability; unbundling; and value added services. This is the leading abstract. Papers are processed separately for the databases

  12. List of reports in reactor safety research by BMFT, USNRC, EPRI and JSTA

    International Nuclear Information System (INIS)

    1981-01-01

    This list reviews reports from the Federal Republic of Germany, from the United States of America and from Japan concerning special problems in the field of Reactor Safety research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the United States Nuclear Regulatory Commission (USNRC), the Electric Power Research Institute (EPRI), and the Japan Science and Technology Agency (JSTA) these reports are available in the Gesellschaft fuer Reaktorsicherheit. The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Program of BMFT, reporting organisation. The list of reports appears quarterly. (orig.) [de

  13. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  14. Qualification of ISI for Bulgarian NPP: UK support

    International Nuclear Information System (INIS)

    Booler, R.

    2000-01-01

    UK Regulator (NII) Phare project provides an assistance to the Bulgarian Regulator in setting up the technical infrastructure for inspection qualification consistent with IAEA Guidelines and western European practice. The Strategy Document defines the methodology for inspection qualification and general roles and responsibilities of the involved organizations. The Qualification Inputs Document describes the information required for the Technical Specifications (component details, inspection aims and limitations). It applies the idea of qualification level - level 1(lowest) to level 3 (highest). The Qualification Procedure Document provides a guidance to the utility ('Kozloduy' NPP) on the preparation of Qualification Procedures (QP). The appendix provides a specific guidance on the performance of the all aspects of qualification at different levels and recommendations for technical justification. QB Method Working Document provides guidance for the Qualification Body. Facilities and Resources Document defines the facilities and resources required for the Qualification Body to perform the tasks described in the Method Working Document. High level QA Document defines the principles of quality control. Other issues and progress report are also presented

  15. Sludge Batch 7B Qualification Activities With SRS Tank Farm Sludge

    International Nuclear Information System (INIS)

    Pareizs, J.; Click, D.; Lambert, D.; Reboul, S.

    2011-01-01

    Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry - Sludge Batch 7b (SB7b) - be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL typically simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). With the tight schedule constraints for SB7b and the potential need for caustic addition to allow for an acceptable glass processing window, the qualification for SB7b was approached differently than past batches. For SB7b, SRNL prepared a Tank 51 and a Tank 40 sample for qualification. SRNL did not receive the qualification sample from Tank 51 nor did it simulate all of the Tank Farm washing and decanting operations. Instead, SRNL prepared a Tank 51 SB7b sample from samples of Tank 7 and Tank 51, along with a wash solution to adjust the supernatant composition to the final SB7b Tank 51 Tank Farm projections. SRNL then prepared a sample to represent SB7b in Tank 40 by combining portions of the SRNL-prepared Tank 51 SB7b sample and a Tank 40 Sludge Batch 7a (SB7a) sample. The blended sample was 71% Tank 40 (SB7a) and 29% Tank 7/Tank 51 on an insoluble solids basis. This sample is referred to as the SB7b Qualification Sample. The blend represented the highest projected Tank 40 heel (as of May 25, 2011), and thus, the highest

  16. Proceedings of EPRI/DOE workshop on nuclear industry valve problems

    International Nuclear Information System (INIS)

    Sprung, J.L.

    1981-01-01

    Representatives from 29 nuclear industry organizations (11 valve manufacturers, 4 nuclear steam supply system vendors, 5 utilities, 3 national laboratories, 2 architect/engineering firms, the Department of Energy (DOE), EPRI, and 2 others) attended the workshop. Working sessions on key valves and on valve stem and seat leakage developed the following recommendations: (1) establish a small permanent expert staff to collect, analyze, and disseminate information about nuclear valve problems; (2) perform generic key valve programs for pressurized water reactors and for boiling water reactors, and several plant specific key valve programs, the latter to demonstrate the cost-effectiveness of such studies; (3) confirm the identity of, define, and initiate needed longer term research and development programs dealing with seat and stem leakage; and (4) establish an industry working group to review and advise on these efforts. Separate abstracts were prepared for three papers which are included in the appendix

  17. Application of quality assurance program to safety related aging equipment or components

    International Nuclear Information System (INIS)

    Papaiya, N.C.

    1990-01-01

    This paper addresses how quality assurance programs and their criteria are applied to safety related and aging equipment or components used in commercial nuclear plant applications. The QA Programs referred to are 10CFR50 Appendix B and EPRI NP-5652. The QA programs as applicable are applied to equipment/component aging qualification, preventive maintenance, surveillance testing and procurement engineering. The intent of this paper is not the technical issues, methods and research of aging. The paper addresses QA program's application to age-related equipment or components in safety related applications. Quality Assurance Program 10CFR50 Appendix B applies to all safety related aging components or equipment related to the qualification program and associated preventive maintenance and surveillance testing programs. Quality Assurance involvement with procurement engineering for age-related commercial grade items supports EPRI NP-5652 and assures that the dedicated OGI is equal to the item purchased as a basic component to 10CFR50 Appendix B requirements

  18. 49 CFR 180.507 - Qualification of tank cars.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Qualification of tank cars. 180.507 Section 180... QUALIFICATION AND MAINTENANCE OF PACKAGINGS Qualification and Maintenance of Tank Cars § 180.507 Qualification of tank cars. (a) Each tank car marked as meeting a “DOT” specification or any other tank car used...

  19. WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Newell, J. D. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Smith, T. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Pareizs, J. M. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-06-01

    The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combined 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These

  20. ENIQ: European Network for Inspection Qualification

    International Nuclear Information System (INIS)

    Champigny, F.; Crutzen, S.; Lemaitre, P.

    1995-01-01

    Many countries are currently considering their own approach to inspection qualification and are carefully assessing experience to date. ENIQ, which stands for European Network for Inspection Qualification, groups the major part of the utilities in Western Europe. The general objective of ENIQ is to coordinate and manage at European level expertise and resources for the assessment and qualification of NDE inspection techniques and procedures, primarily for nuclear components. Also non-nuclear heavy duty components will be considered. Within ENIQ there is a growing consensus of opinion on the general principles of a European approach towards inspection qualification. In this paper the main activities, organization and actual status of ENIQ will be discussed

  1. Simulating Large Area, High Intensity AM0 Illumination – Test Results from Bepicolombo and Solar Orbiter Qualification

    Directory of Open Access Journals (Sweden)

    Oberhüttinger C.

    2017-01-01

    Specifically, the following topics will be treated. Different methods like electrical performance, thermo-optical and external quantum efficiency measurements have been used to characterize the behaviour of the solar cells after illumination under these conditions. A special focus has been put on the electrical performance. A comparison to other solar cell qualification tests under solely UV radiation has been undertaken. The results have also been compared to a theoretical model. However, the paper will not cover only characterization results but will also give some insight in challenges experienced during the test execution itself. Deviating from other solar cell qualification tests, a representatively equipped photovoltaic assembly on carbon fibre reinforced cyanate has also been included. On these coupon segments, solar cell assemblies connected to shunt diodes and placed next to optical surface reflectors have been exposed to AM0 illumination to qualify the solar cells including their surroundings which therefore covers also contamination effects. Last but not least, first results from the Solar Orbiter qualification are presented. This test with additional 1000 hours and increased intensity has been completed recently.

  2. Impact of the draft DOE Training and Qualification Standard on an established training and qualification program

    International Nuclear Information System (INIS)

    Taylor, R.G.; Worley, C.A.

    1999-01-01

    One of the provisions of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 97-2 was that the US Department of Energy (DOE) hor e llipsis Develop and institute ahor e llipsiscourse in criticality and criticality safety hor e llipsis to serve as the foundation for a program of formal qualification of criticality engineers. In response, a draft DOE standard establishing requirements for a formal qualification program for nuclear criticality safety (NCS) engineers has been prepared and is currently in review. The Oak Ridge Y-12 plant implemented a formal training and qualification program for NCS engineers in 1995. The program complies with existing DOE requirements. The program was developed using a performance-based systematic approach to training and is accomplished through structured mentoring where experienced personnel interact with candidates through various learning exercises. Self-study, exercises, and work under instruction are all utilized. The candidate's performance is evaluated by mentors and oral boards. Competency gained through experience at other sites can also be credited. Technical portions of the program are primarily contained in an initial Engineer-in-Training segment and in subsequent task-specific qualifications. The Engineer-in-Training segment exposes the candidate to fundamental NCS concepts through example problems; ensures the initial compliance training requirements are met; and includes readings from applicable procedures, technical documents, and standards. Upon completion of this initial training, candidates proceed to task qualifications. Tasks are defined NCS activities such as operational reviews, criticality safety evaluations, criticality safety computations, criticality accident alarm system (CAAS) evaluations, support for emergency management, etc. Qualification on a task basis serves to break up training into manageable pieces and expedites qualification of candidates to perform specific production activities. The

  3. Equipment qualification testing methodology research at Sandia Laboratories

    International Nuclear Information System (INIS)

    Jeppesen, D.

    1983-01-01

    The Equipment Qualification Research Testing (EQRT) program is an evolutionary outgrowth of the Qualification Testing Evaluation (QTE) program at Sandia. The primary emphasis of the program has been qualification methodology research. The EQRT program offers to the industry a research-oriented perspective on qualification-related component performance, as well as refinements to component testing standards which are based upon actual component testing research

  4. 14 CFR 121.453 - Flight engineer qualifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Flight engineer qualifications. 121.453... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Crewmember Qualifications § 121.453 Flight engineer qualifications. (a) No certificate holder may use any person nor may any person serve as a flight engineer on an...

  5. Inspection qualification as a tool to risk based ET ISI of VVER type SG tubes

    International Nuclear Information System (INIS)

    Horacek, L.

    2002-01-01

    A Pilot study on Eddy current inspection qualification of VVER 440 steam generator tubes, discussed in this paper, followed the ENIQ methodology principles and covered briefly the assumed scope of ET qualification, relevant elaborated qualification documents, known ISI limitations and a review of input information on component and defects determined for Eddy current inspection qualification of VVER 440 steam generator tubes. The information includes the fabrication of the test blocks with SG tube segments provided by intended defect simulations of realistic SCC type and basic data on the realistic SCC type defects manufacturing technology. Lessons learned from the development of manufacturing technology of SSC type of defects, regional blind tests, elaboration of the preliminary technical justification for Eddy current automated inspections, potential optimisation of inspection procedures, laboratory and practical open trials are summarised in the paper. The results of the Pilot study also especially in relation to POD curve being determined seem to be useful for practical operational ISI programme and Risk informed ISI decisions and the establishment of plugging criteria of VVER 440 and VVER 1000 type steam generator tubes. (orig.)

  6. EPRI/DOE High-Burnup Fuel Sister Rod Test Plan Simplification and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hanson, B. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Shimskey, R. W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Klymyshyn, N. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Webster, R. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jensen, P. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); MacFarlan, P. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Billone, Mike [Argonne National Lab. (ANL), Argonne, IL (United States); Scaglione, John [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-15

    The EPRI/DOE High-Burnup Confirmatory Data Project (herein called the “Demo”) is a multi-year, multi-entity test with the purpose of providing quantitative and qualitative data to show if high-burnup fuel mechanical properties change in dry storage over a ten-year period. The Demo involves obtaining 32 assemblies of high-burnup PWR fuel of common cladding alloys from the North Anna Nuclear Power Plant, loading them in an NRC-licensed TN-32B cask, drying them according to standard plant procedures, and then storing them on the North Anna dry storage pad for ten years. After the ten-year storage time, the cask will be opened and the mechanical properties of the rods will be tested and analyzed.

  7. Development of improved methods for the LWR lattice physics code EPRI-CELL

    International Nuclear Information System (INIS)

    Williams, M.L.; Wright, R.Q.; Barhen, J.

    1982-07-01

    A number of improvements have been made by ORNL to the lattice physics code EPRI-CELL (E-C) which is widely used by utilities for analysis of power reactors. The code modifications were made mainly in the thermal and epithermal routines and resulted in improved reactor physics approximations and more efficient running times. The improvements in the thermal flux calculation included implementation of a group-dependent rebalance procedure to accelerate the iterative process and a more rigorous calculation of interval-to-interval collision probabilities. The epithermal resonance shielding methods used in the code have been extensively studied to determine its major approximations and to examine the sensitivity of computed results to these approximations. The study has resulted in several improvements in the original methodology

  8. Development of methods for nuclear power plant personnel qualifications and training

    International Nuclear Information System (INIS)

    Jorgensen, C.C.; Carter, R.J.

    1984-01-01

    The Nuclear Regulatory Commission (NRC) has proposed additions and revisions to Title 10 of the Code of Federal Regulations, Parts 50 and 55, and to Regulatory Guides 1.8 and 1.149. ORNL is developing methods and some aspects of the technical basis for the implementation and assessment of training programs, personnel qualifications, and simulation facilities. The paper describes the three methodologies which were developed during the FY-1984 research: a task sort procedure (TSORT); a simulation facility evaluation methodology; and a task analysis profiling system (TAPS)

  9. Materials qualification for nuclear power plants

    International Nuclear Information System (INIS)

    Braconi, F.

    1987-01-01

    The supply of materials to be used in the fabrication of components submitted to pressure destined to Atucha II nuclear power plant must fulfill the quality assurance requirements in accordance with the international standards. With the aim of promoting the national participation in CNA II, ENACE had the need to adapt these requirements to the national industry conditions and to the availability of official entities' qualification and inspection. As a uniform and normalized assessment for the qualification of materials did not exist in the country, ENACE had to develop a materials suppliers qualification system. This paper presents a suppliers qualification procedure, its application limits and the alternative procedures for the acceptance of individual stock and for the stock materials purchase. (Author)

  10. Unintended Consequences: How Qualification Constrains Innovation

    Science.gov (United States)

    Brice, Craig A.

    2011-01-01

    The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

  11. Establishment of an unrelated umbilical cord blood bank qualification program: ensuring quality while meeting Food and Drug Administration vendor qualification requirements.

    Science.gov (United States)

    Rabe, Fran; Kadidlo, Diane; Van Orsow, Lisa; McKenna, David

    2013-10-01

    Qualification of a cord blood bank (CBB) is a complex process that includes evaluation of multiple aspects of donor screening and testing, processing, accreditation and approval by professional cell therapy groups, and results of received cord blood units. The University of Minnesota Medical Center Cell Therapy Laboratory has established a CBB vendor qualification process to ensure the CBB meets established regulatory and quality requirements. The deployed qualification of CBBs is based on retrospective and prospective review of the CBB. Forty-one CBBs were evaluated retrospectively: seven CBBs were disqualified based on failed quality control (QC) results. Eight CBBs did not meet the criteria for retrospective qualification because fewer than 3 cord blood units were received and the CBB was not accredited. As of March 2012, three US and one non-US CBBs have been qualified prospectively. One CBB withdrew from the qualification process after successful completion of the comprehensive survey and subsequent failure of the provided QC unit to pass the minimum criteria. One CBB failed the prospective qualification process based on processing methods that were revealed during the paper portion of the evaluation. A CBB qualification process is necessary for a transplant center to manage the qualification of the large number of CBBs needed to support a umbilical cord blood transplantation program. A transplant center that has utilized cord blood for a number of years before implementation of a qualification process should use a retrospective qualification process along with a prospective process. © 2013 American Association of Blood Banks.

  12. Validation of seismic soil-structure interaction analysis methods: EPRI [Electric Power Research Institute]/NRC [Nuclear Regulatory Commission] cooperation in Lotung, Taiwan, experiments

    International Nuclear Information System (INIS)

    Kot, C.A.; Srinivasan, M.G.; Hsieh, B.J.; Tang, Y.K.; Kassawara, R.P.

    1986-01-01

    The cooperative program between NRC/ANL and EPRI on the validation of soil-structure interaction analysis methods with actual seismic response data is described. A large scale-model of a containment building has been built by EPRI/Taipower in a highly seismic region of Taiwan. Vibration tests were performed, first on the basemat before the superstructure was built and then on the completed structure. Since its completion, the structure has experienced many earthquakes. The site and structural response to these earthquakes have been recorded with field (surface and downhole) and structural instrumentation. The validation program involves blind predictions of site and structural response during vibration tests and a selected seismic event, and subsequent comparison between the predictions and measurements. The predictive calculations are in progress. The results of the correlation are expected to lead to the evaluation of the methods as to their conservatisms and sensitivities

  13. List of reports from reactor safety research of BMFT, USNRC, EPRI and JSTA

    International Nuclear Information System (INIS)

    1979-01-01

    This list reviews reports from the Federal Republic of Germany, from the USA and from Japan concerning special problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the USNRC, the Electric Power Research Institute (EPRI), and the Japan Science and Technology Agency (JSTA) these reports are available in the Gesellschaft fuer Reaktorsicherheit. The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Program of BMFT, reporting organisation. The list of reports appears quarterly. Requests for reports should be adressed to GRS, Forschungsbetreuung. Contractual view points have to be considered for the distribution of the reports. (orig./HP) [de

  14. List of reports from reactor safety research of BMFT, USNRC, EPRI and JSTA

    International Nuclear Information System (INIS)

    1978-12-01

    This list reviews reports from the Federal Republic of Germany, from the USA and from Japan concerning special problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the USNRC, the Electric Power Research Institute (EPRI), and the Japan Science and Technology Agency (JSTA) these reports are available in the Gesellschaft fuer Reaktorsicherheit. The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Program of BMFT, reporting organisation. The list of reports appears quarterly. Requests for reports should be addressed to GRS, Forschungsbetreuung. Contractual view points have to be considered for the distribution of the reports. (orig./HP) [de

  15. List of reactor safety research reports from BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1982-07-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning special Problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technologie Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these Reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Program of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  16. NDE training activities at the EPRI NDE center

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    The need for an industry-wide qualification for NDE personnel is becoming more evident in both in-service inspection and technical skills training. ASME Section XI requirements for the qualification and certification of visual, ultrasonic, and eddy current examines is one of the major areas being supported by training at the Center. The other major thrust is in response to the Boiling Water Reactor Owners Group and its recognition of the importance of the UT operator's accurately detecting, discriminating, and sizing intergranular stress corrosion cracks (IGSCC) in piping, and inspecting weld overlay repairs of these cracked pipes. In addition, the pressurized water reactor (PWR) utilities have recognized the importance of improved eddy current data analysis of steam generator tubing. The overall intent of the Center's training is to meet the most critical utility needs with quality training that can be used by the trainee's employer as a part of its certification of that individual. To do this, the Center has organized and activated a carefully maintained documentation and records system built around the Continuing Education Unit (CEU). To address the problem of the small supply of entry-level NDE personnel available to the utilities, the Center has developed, through its Human Resource Development, academic and utility co-op programs to generate guidelines and NDE teaching materials for high schools, technical schools, and universities

  17. EPRI's POWERCOACH trademark software development project

    International Nuclear Information System (INIS)

    Rost, S.; Leu, Kehshiou

    1993-01-01

    Today's complex bulk power market accounts for an estimated $35 billion in transactions a year, significantly more than a decade ago. With the increased levels of non-utility generation and changing strategies in the utility industry, it is anticipated that the trend toward rapid growth in the bulk power market will continue. This market has evolved from an ad hoc residual market to one that in some respects stands at par with the retail market in the plans of many utilities. The bulk power market is not based on the obligation to serve to the same extent as retail markets. Utility participation in this market is therefore purely voluntary. This freedom of action or inaction in the bulk power market actually renders corporate decision-making, investment related or operational, more complicated in many respects than in retail markets. Examples of the burgeoning uncertainties affecting the bulk power market include the rapid expansion of transactions undertaken through power pools, and the impact on utility planning and operations brought about by the abundance and price attractiveness of power available for flexible periods. These uncertainties present an ideal opportunity to employ state-of-the-art analytical models to facilitate the effective use of utility assets to foster the efficient functioning of the entire bulk power market. This paper will focus on the POWERCOACH methodology for short-term bulk power transaction analysis under conditions of uncertainty. In August 1992, UPMP began a seventeen month project to convert POWERCOACH from a methodology to a fully functional, commercial software package. UPMP is developing the POWERCOACH software with the extensive, direct involvement of thirty EPRI member utilities. A synopsis of POWERCOACH is presented

  18. Changing existing qualifications into outcomes-based qualifications ...

    African Journals Online (AJOL)

    Various workshops were facilitated to determine the outcomes of each level of our qualification, B Tech: Policing. This led to the formulation of a purpose statement, exit level outcomes and specific outcomes as well as assessment criteria and the critical outcomes embedded in each level identified. Using the specific ...

  19. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  20. Training and qualification of nuclear power plant operators

    International Nuclear Information System (INIS)

    Ohsuga, Y.

    2008-01-01

    Based on training experiences of the nuclear power plant operators of pressurized water reactors (PWR) at the Nuclear Power Training Center Ltd. (NTC) in Japan, training programs were reviewed referring to US training programs. A systematic approach is deployed to them, which mainly consist of on-the-job training and the NTC training courses to meet the needs of all operators from beginners to experienced veterans according to their experiences and objectives. The NTC training is conducted using the simulators that simulate the nuclear power plant dynamics through the use of computers. The operators trained at the NTC work in the central control room of every PWR power plant. The NTC also carries out the qualification examinations for the shift managers. (T. Tanaka)

  1. On relaxing the Mangasarian-Fromovitz constraint qualification

    Czech Academy of Sciences Publication Activity Database

    Kruger, A.Y.; Minchenko, L.; Outrata, Jiří

    2014-01-01

    Roč. 18, č. 1 (2014), s. 171-189 ISSN 1385-1292 R&D Projects: GA ČR GAP402/12/1309 Institutional support: RVO:67985556 Keywords : Nonlinear programming * Regularity conditions * Constraint qualifications * Lagrange multipliers * Mangasarian–Fromovitz constraint qualification * Constant rank constraint qualification Subject RIV: BA - General Mathematics Impact factor: 0.679, year: 2014 http://library.utia.cas.cz/separaty/2014/MTR/outrata-0426110.pdf

  2. 5 CFR 317.502 - Qualifications Review Board certification.

    Science.gov (United States)

    2010-01-01

    ... REGULATIONS EMPLOYMENT IN THE SENIOR EXECUTIVE SERVICE Career Appointments § 317.502 Qualifications Review Board certification. (a) A Qualification Review Board (QRB) convened by OPM must certify the executive... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualifications Review Board certification...

  3. Nuclear Criticality Safety Department Qualification Program

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1996-01-01

    The Nuclear Criticality Safety Department (NCSD) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSD technical and managerial qualification as required by the Y-1 2 Training Implementation Matrix (TIM). This Qualification Program is in compliance with DOE Order 5480.20A and applicable Lockheed Martin Energy Systems, Inc. (LMES) and Y-1 2 Plant procedures. It is implemented through a combination of WES plant-wide training courses and professional nuclear criticality safety training provided within the department. This document supersedes Y/DD-694, Revision 2, 2/27/96, Qualification Program, Nuclear Criticality Safety Department There are no backfit requirements associated with revisions to this document

  4. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2001-01-01

    The overall training system and the development of projects for training of all categories of NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce staff were the subject of Nuclear Regulatory Authority of the Slovak Republic (UJD) attention. During 2000, the following inspections were carried out on nuclear personnel training: (a) NPP Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff ; (b) NPP Mochovce: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; an inspection focused on verifying the simulator aided training; an inspection focused on checking the preparedness of NPP Mochovce operation and technical personnel for NPP Mochovce Unit 2 operation; (c) Technology for treatment and conditioning of radioactive waste Bohunice (BSC): an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff; VUJE Trnava: verification of technical equipment and professional skills of VUJE Trnava staff and tasks arising out of the 'Authorisation on nuclear installation staff training'. Examinations of selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPPs. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under

  5. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  6. Signal validation of SPDS variables for Westinghouse and Combustion Engineering plants - an EPRI project

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Signal validation in the context of this project is the process of combining information from multiple plant sensors to produce highly reliable information about plant conditions. High information reliability is achieved by the use of redundant sources of information and by the inherent detection, identification, and isolation of faulty signals. The signal validation methodology that has been developed in previous EPRI-sponsored projects has been enhanced and applied toward validation of critical safety-related SPDS signals in the Northeast Utilities Millstone 3 Westinghouse PWR plant and the Millstone 2 Combustion Engineering PWR plant. The designs were implemented in FORTRAN software and tested off-line using recorded plant sensor data, RETRAN-generated simulation data, and data to exercise software logic branches and the integration of software modules. Designs and software modules have been developed for 15 variables to support six PWR SPDS critical safety functions as required by a utility advisory group attached to the project. The signal validation process automates a task currently performed by plant operators and does so with consistent, verified logic regardless of operator stress and training level. The methodology uses a simple structure of generic software blocks, a modular implementation, and it performs effectively within the processor and memory constraints of modern plant process computers. The ability to detect and isolate sensor failures with greater sensitivity, robustness, and coverage of common-cause failures should ultimately lead to improved plant availability, efficiency, and productivity

  7. Simulator training and licensing examination for nuclear power station operator

    International Nuclear Information System (INIS)

    Xu Pingsheng

    2007-01-01

    For the recruitment, training and position qualification of the simulator instructors and feedback of training effect, the management approaches are formulated in 'The System for Simulator Training and Licensing Examination of Daya Bay Nuclear Power Station Operators'. The concrete requirements on the professional knowledge, work experience and foreign language ability of a simulator instructor are put forward. The process of instructor training is designed. The training items include the trainer training, pedagogy training, time management training, operation activities training during outage of unit, 'shadow' training and on-the-jot training on simulator courses. Job rotation is realized between simulator instructor and licensing personnel on site. New simulator instructor must pass the qualification identification. After a duration of 2 years, re-qualification has to be carried out. On the basis of the operator training method introduced from EDF (electricite De France), some new courses are developed and the improvement on the initial training, retaining courses, the technical support and the experience feedback by using the simulator is done also. (authors)

  8. EPRI Guide to Managing Nuclear Utility Protective Clothing Programs

    International Nuclear Information System (INIS)

    Kelly, J.J.; Kelly, D.M.

    1993-10-01

    The Electric Power Research Institute (EPRI) commissioned a radioactive waste related project (RP2414-34) in 1989 to produce a guide for developing and managing nuclear plant protective clothing programs. Every nuclear facility must coordinate some type of protective clothing program for its radiation workers to ensure proper and safe protection for the wearer and to maintain control over the spread of contamination. Yet, every nuclear facility has developed its own unique program for managing such clothing. Accordingly, a need existed for a reference guide to assist with standardizing protective clothing programs and in controlling the potentially escalating economics of such programs. The initial Guide to Managing Nuclear Utility Protective Clothing Programs, NP-7309, was published in May 1991. Since that time, a number of utilities have reviewed and/or used the report to enhance their protective clothing programs. Some of these utilities requested that a computer program be developed to assist utilities in evaluating the economics of protective clothing programs consistent with the guidance in NP-7309. The PCEVAL computer code responds to that industry need. This report, the PCEVAL User's Manual, provides detailed instruction on use of the software

  9. Qualification of a Plant Disease Simulation Model: Performance of the LATEBLIGHT Model Across a Broad Range of Environments.

    Science.gov (United States)

    Andrade-Piedra, Jorge L; Forbes, Gregory A; Shtienberg, Dani; Grünwald, Niklaus J; Chacón, María G; Taipe, Marco V; Hijmans, Robert J; Fry, William E

    2005-12-01

    ABSTRACT The concept of model qualification, i.e., discovering the domain over which a validated model may be properly used, was illustrated with LATEBLIGHT, a mathematical model that simulates the effect of weather, host growth and resistance, and fungicide use on asexual development and growth of Phytophthora infestans on potato foliage. Late blight epidemics from Ecuador, Mexico, Israel, and the United States involving 13 potato cultivars (32 epidemics in total) were compared with model predictions using graphical and statistical tests. Fungicides were not applied in any of the epidemics. For the simulations, a host resistance level was assigned to each cultivar based on general categories reported by local investigators. For eight cultivars, the model predictions fit the observed data. For four cultivars, the model predictions overestimated disease, likely due to inaccurate estimates of host resistance. Model predictions were inconsistent for one cultivar and for one location. It was concluded that the domain of applicability of LATEBLIGHT can be extended from the range of conditions in Peru for which it has been previously validated to those observed in this study. A sensitivity analysis showed that, within the range of values observed empirically, LATEBLIGHT is more sensitive to changes in variables related to initial inoculum and to weather than to changes in variables relating to host resistance.

  10. Application of operating experience in environmental qualification program

    International Nuclear Information System (INIS)

    Lee, S.Y.; Wise, R.

    2000-01-01

    Environmental qualification (EQ) of equipment related to nuclear safety has been carried out in the nuclear community since the 70's. It started with electrical equipment and then expanded to include mechanical equipment. During this evolutionary process, the methods used for EQ have gone through a long period of refinement and clarification. Prior to 1971, qualification for equipment in licensed nuclear power plants was based on the use of electrical components of commonly accepted high industrial quality without the benefit of specific environmental qualification standards. Between 1971 and 1974, most plants used the criteria of IEEE Standard 323-1971 as the basis for demonstrating qualification. Also during this period related 'daughter' standards, mainly by IEEE, became available which addressed qualification for specific equipment items. After July 1974, plants were required to meet the more comprehensive guidelines specified in IEEE Standard 323-1974 and the related 'daughter' standards. IEEE Standard 323-1974 later evolved into IEEE Standard 323-1983. For nuclear power plants built in Ontario during the 70's, i.e. Pickering B and Bruce B, has included the environmental qualification requirements in their respective nuclear safety design guides. It is now recognized that they are not up to the current EQ standards. Darlington, constructed during the 80's, implemented the environmental qualification program in its project. An Environmental Qualification (EQ) Program is now under way in Ontario Power Generation (OPG) to formally implement the Environmental Qualification for Bruce B, Pickering B, and Pickering A and to preserve the Qualification for Darlington G.S. This paper makes a thorough a review of the standard methods used in the past by utilities for environmental qualification. These methods include type testing, analysis, and operating experience. Both type testing and analysis have been clearly defined in standards listed in References [2] to [6] and

  11. Analytical study for frequency effects on the EPRI/USNRC piping component tests. Part 1: Theoretical basis and model development

    International Nuclear Information System (INIS)

    Adams, T.M.; Branch, E.B.; Tagart, S.W. Jr.

    1994-01-01

    As part of the engineering effort for the Advanced Light Water Reactor the Advanced Reactor Corporation formed a Piping Technical Core Group to develop a set of improved ASME Boiler and Pressure Vessel Code, Section III design rules and approaches for ALWR plant piping and support design. The technical basis for the proposed changes to the ASME Boiler and Pressure Vessel Code developed by Technical Core Group for the design of piping relies heavily on the failure margins determined from the EPRI/USNRC piping component test program. The majority of the component tests forming the basis for the reported margins against failure were run with input frequency to natural frequency ratios (Ω/ω) in the range of 0.74 to 0.87. One concern investigated by the Technical Core Group was the effect which could exist on measured margins if the tests had been run at higher or lower frequency ratios than those in the limited frequency ratio range tested. Specifically, the concern investigated was that the proposed Technical Core Group Piping Stress Criteria will allow piping to be designed in the low frequency range (Ω/ω ≥ 2.0) for which there is little test data from the EPRI/USNRC test program. The purpose of this analytical study was to: (1) evaluate the potential for margin variation as a function of the frequency ratio (R ω = Ω/ω, where Ω is the forcing frequency and ω is the natural component frequency), (2) recommend a margin reduction factor (MRF) that could be applied to margins determined from the EPRI/USNRC test program to adjust those margins for potential margin variation with frequency ratio. Presented in this paper is the analytical approach and methodology, which are inelastic analysis, which was the basis of the study. Also, discussed is the development of the analytical model, the procedure used to benchmark the model to actual test results, and the various parameter studies conducted

  12. Qualification tests for a dosimetry system

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The report of qualification tests for personnel dosemeters is detailed. Qualification test for the energy response and the incidence angle is given. The procedure of test is resumed. Different coefficients of conversion used in these tests are given in tables. (N.C.)

  13. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  14. Initialization of the Euler model MODIS with field data from the 'EPRI plume model validation project'

    International Nuclear Information System (INIS)

    Petersen, G.; Eppel, D.; Lautenschlager, M.; Mueller, A.

    1985-01-01

    The program deck MODIS (''MOment DIStribution'') is designed to be used as operational tool for modelling the dispersion of a point source under general atmospheric conditions. The concentration distribution is determined by calculating its cross-wind moments on a vertical grid oriented in the main wind direction. The model contains a parametrization for horizontal and vertical coefficients based on a second order closure model. The Eulerian time scales, preliminary determined by fitting measured plume cross sections, are confirmed by comparison with data from the EPRI plume model validation project. (orig.) [de

  15. Full-scope training simulators

    International Nuclear Information System (INIS)

    Ugedo, E.

    1986-01-01

    The following topics to be covered in this report are: Reasons justifying the use of full-scope simulators for operator qualification. Full-scope simulator description: the control room, the physical models, the computer complex, the instructor's console. Main features of full-scope simulators. Merits of simulator training. The role of full-scope simulators in the training programs. The process of ordering and acquiring a full-scope simulator. Maintaining and updating simulator capabilities. (orig./GL)

  16. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  17. Total qualification of class 1E electric equipment

    International Nuclear Information System (INIS)

    Chauvin, G.

    1982-09-01

    For nuclear power plant projects in France, Framatome and its partners Electricite de France (EDF) and the Commissariat a l'Energie Atomique (CEA) have responded to the present qualification context by implementing a wide-ranging qualification program to acquire significant organizational and practical experience. The following sections detail Framatome's approach to the activities of an organization mandated to provide a complete spectrum of qualification services. Thorough implementation of a Class 1E electric equipment qualification program by the competent organization or qualifier entails completion of three consecutive steps: 1) program preparation, 2) program implementation, and 3) analysis of test results and conclusion. The qualifier assumes extensive responsibility for each of these steps. The following sections present test facilities used in France to conduct a total qualification program for Class 1E electric equipment

  18. Qualification criteria for persons responsible for radiation protection

    International Nuclear Information System (INIS)

    Wehner, G

    1980-01-01

    A survey of the qualification criteria included in the German atomic law (Atomic Energy Act, Radiological Protection Ordinance and X-ray Protection Ordinance) for persons responsible for radiation protection is given. Especially the various activities for which a health physics officer is required, the range of qualification in each case and the way the qualification has to be proved, are pointed out. Also the different guides that are issued to complete the legal requirements are mentioned. The definitions of the term qualification for health physics given in the different guides are cited and it is shown, that the qualification of a healt physics officer has to be based on the three criteria (I) vocational training. (II) professional experience and (III) the necessary knowledge in radiation protection. (orig./HP) [de

  19. Development Of A Macro-Batch Qualification Strategy For The Hanford Tank Waste Treatment And Immobilization Plant

    International Nuclear Information System (INIS)

    Herman, Connie C.

    2013-01-01

    following: Collection and characterization of samples for relevant process analytes from the tanks to be blended during the staging process; Initiation of qualification activities earlier in the staging process to optimize the campaign composition through evaluation from both a processing and glass composition perspective; Definition of the parameters that are important for processing in the WTP facilities (unit operations) across the anticipated range of wastes and as they relate to qualification-scale equipment; Performance of limited testing with simulants ahead of the waste feed qualification sample demonstration as needed to determine the available processing window for that campaign; and Demonstration of sufficient mixing in the staging tank to show that the waste qualification sample chemical and physical properties are representative of the transfers to be made to WTP. Potential flowcharts for derivatives of the Hanford waste feed qualification process are also provided in this report. While these recommendations are an extension of the existing WTP waste qualification program, they are more in line with the processes currently performed for SRS. The implementation of these processes at SRS has been shown to offer flexibility for processing, having identified potential processing issues ahead of the qualification or facility processing, and having provided opportunity to optimize waste loading and throughput in the DWPF

  20. Safety design guides for environmental qualification for CANDU 9

    International Nuclear Information System (INIS)

    Lee, Duk Su; Chang, Woo Hyun; Lee, Nam Young; A. C. D. Wright

    1996-03-01

    This safety design guide describes the safety philosophy and requirements for the environmental qualification of safety related systems and components for CANDU 9. The environmental qualification program identifies the equipments to be qualified and conditions to be used for qualification and provides comprehensive set of documentation to ensure that the qualification is complete and can be maintained for the life of the plant. A summary of the system, components and structures requiring environmental qualification is provided in the table for the guidance of the system design, and this table will be subject to change or confirmation by the environmental qualification program. Also, plant ares subject to harsh environment is provided in the figure. The change status of the regulatory requirements, code and standards should be traced and this safety design guide shall be updated accordingly. 1 tab., 5 figs. (Author) .new

  1. List of reports on reactor safety research from BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1985-01-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning special Problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l' Energie Atomique (CEA), the Japan Science and Technologie Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these Reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programm of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  2. List of reports on reactor safety research from BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1985-08-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning special problems in the field of reactor safety research. According to the cooperation of the Federal Ministry for Research and Technology (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available from the Society for Reactor Safety (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Program of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  3. List of reports concerning reactor safety research from BMFT, CEA, EPRI, JSTA, and USNRC

    International Nuclear Information System (INIS)

    1982-12-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning special problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technologie Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these Reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programm of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  4. Equipment Qualification Data Base user manual

    International Nuclear Information System (INIS)

    Decker, Q.R.; Fackrell, L.J.; Fitch, L.R.; Meeky, O.B.

    1985-09-01

    This manual details the Equipment Qualification Data Base (EQDB), its usage, and contents. The EQDB consists of two files; the Plant Qualification File (PQF) and the Equipment Qualification File (EQF). The PQF contains plant specific environmental data and the EQF contains summaries of various test results. Two data management systems are used to manipulate the data and are discussed in this manual. SAS Institute System 2000 (S2K) is the management system for the PQF and Query Update (QU) is the operating system for the EQF. Each management system contains report writers. These writers and how to use them are discussed in detail in this manual

  5. Solar array qualification through qualified analysis

    Science.gov (United States)

    Zijdemans, J.; Cruijssen, H. J.; Wijker, J. J.

    1991-04-01

    To achieve qualification is in general a very expensive exercise. For solar arrays this is done by a dedicated test program through which final qualification is achieved. Due to severe competition on the solar array market, cheaper means are looked for to achieve a qualified product for the customers. One of the methods is to drastically limit the environmental test program and to qualify the solar-array structure against its environmental loads by analysis. Qualification by analysis is possible. The benefits are that a significant amount of development effort can be saved in case such a powerful tool is available. Extensive testing can be avoided thus saving time and money.

  6. Implementation plans for the Korean certified tumor registrar qualification system.

    Science.gov (United States)

    Boo, Yoo-Kyung; Lim, Hyun-Sook; Won, Young-Joo

    2014-01-01

    Cancer registration data is used to understand the nation's cancer burden, and to provide significant baseline data for cancer control efforts, as well as, research on cancer incidence, mortality, survival, and prevalence. A system that approves, assesses, and manages the qualification of specialists, responsible for performing cancer registration, has not been developed in Korea. This study presents ways to implement a certification system designed for the qualification of tumor registrars in Korea. Requirements for implementing a certified tumor registrar qualification system were determined by reviewing the system for establishing qualifications in Korea and the American qualification system via the National Cancer Registrars Association (NCRA). Moreover, a survey was conducted on Korean medical records administrators, who had taken the U.S. Certified Tumor Registrar (CTR) examination, in order to review their opinions regarding these requirements. This study verified the feasibility of a qualification examination based on the opinions of CTR specialists by determining the following: items, and the associated ratings, of the qualifications necessary to register individuals as certified tumor registrars in a private qualification system; status of human resources required for the examination or training processes; plans regarding the organization needed for management, and operation of qualifications, examination standards, subject areas, examination methods, examination qualifications, or education and training programs. The implementation of a certified tumor registrar qualification system will lead to enhanced job competency for specialists and a qualitative improvement of cancer registration data. It will also reliably foster human resources that will lay the groundwork needed to establish scientific and reasonable national cancer management policies.

  7. Sludge Washing And Demonstration Of The DWPF Flowsheet In The SRNL Shielded Cells For Sludge Batch 8 Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Pareizs, J. M.; Crawford, C. L.

    2013-04-26

    The current Waste Solidification Engineering (WSE) practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks to Tank 51. Tank 51 sludge is washed and transferred to Tank 40, the current Defense Waste Processing Facility (DWPF) feed tank. Prior to transfer of Tank 51 to Tank 40, the Savannah River National Laboratory (SRNL) typically simulates the Tank Farm and DWPF processes using a Tank 51 sample (referred to as the qualification sample). WSE requested the SRNL to perform characterization on a Sludge Batch 8 (SB8) sample and demonstrate the DWPF flowsheet in the SRNL shielded cells for SB8 as the final qualification process required prior to SB8 transfer from Tank 51 to Tank 40. A 3-L sample from Tank 51 (the SB8 qualification sample; Tank Farm sample HTF-51-12-80) was received by SRNL on September 20, 2012. The as-received sample was characterized prior to being washed. The washed material was further characterized and used as the material for the DWPF process simulation including a Sludge Receipt and Adjustment Tank (SRAT) cycle, a Slurry Mix Evaporator (SME) cycle, and glass fabrication and chemical durability measurements.

  8. Qualification Approach for the CMC Nose Cap of X-38

    Science.gov (United States)

    Weihs, H.; Gülhan, A.

    2002-01-01

    In October 2001 the flight hardware of the TPS nose assembly of X-38 has been installed at the main structure of the X-38 V201 vehicle at NASA's Johnson Space Center, Houston Texas. X-38 is a test vehicle for the planned Crew Return Vehicle CRV for the International Space Station ISS. Currently the flight of the X-38 is scheduled for 2005. Besides the Body flaps (MAN-T) and the nose skirt system (ASTRIUM, MAN-T) the nose cap system is one of the essential hot structure components that were developed within Germany's national TETRA (Technologies for future space transportation systems) programme. The integration of the hardware was an important milestone for the nose cap development which started approx. 5 years ago. DLR-Stuttgart is responsible for the design and manufacturing of the CMC based nose cap system, which has to withstand the extreme thermal loads during re-entry which will induce a maximum temperature up to 1750 °C on the surface of the cap. Thus, the shell of the cap system is designed and manufactured using DLR's C/C-SiC material which is a special kind of carbon based ceramic matrix composite (CMC) material produced via the in house liquid silicon infiltration process of DLR. This material has demonstrated its good temperature resistance during FOTON and EXPRESS re-entry capsule missions. Besides the design and manufacturing of the nose cap system, the qualification approach was an important effort of the development work. Missing a test facility which is able to simulate all loading conditions from lift off to re-entry and landing, is was necessary to separate the loads and to use different test facilities. Considering the limitations of the facilities, the budget and time constraints, an optimized test philosophy has been established. The goal was to use a full scale qualification unit including all TPS components of the nose area for most of the tests. These were the simulation of ascent loads given by the shuttle requirements and descent loads

  9. Approach to customer qualification of the BNFL Sellafield Mox Plant

    International Nuclear Information System (INIS)

    Sullivan, P.

    2003-01-01

    BNFL started plutonium commissioning of its Sellafield MOX Plant (SMP) in December 2001, with the first MOX pellets being produced in May 2002. SMP was designed to manufacture a range of both PWR and BWR fuel types for a number of different customers. During commissioning and early MOX fuel manufacturing BNFL has been demonstrating its ability to both automatically manufacture and inspect MOX fuel to meet the requirements of different customers' specifications and fuel types. The qualification project consisted of common and project specific qualification. Common qualification was carried out to demonstrate BNFL could meet several customers' requirements during the same qualification test. Project specific qualification was carried out for one customer only as the fabrication or inspection equipment was specific to their fuel type. An example is the fuel assembly process. The reasons for BNFL carrying out common qualification were: - Develop a common qualified process to meet different customer specifications. - Minimise future qualifications prior to starting future fuel campaigns. - Ensure BNFL understands and effectively manages different customer requirements in SMP. BNFL has approached qualification of SMP systematically. Firstly the inspection system was qualified, and once completed the inspection system was then used in the qualification of the manufacturing process. (orig.)

  10. 49 CFR 214.351 - Training and qualification of flagmen.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification of flagmen. 214.351... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.351 Training and qualification of flagmen. (a) The training and qualification for roadway workers assigned the...

  11. On safety 1E qualification of electrical equipment for nuclear power stations

    International Nuclear Information System (INIS)

    Segarceanu, D.; Geambasu, C.; Avramescu, M.

    1995-01-01

    Electrical equipment and systems for the emergency shutdown of a nuclear reactor are qualified according to safety class 1E. Methods of qualification meeting the requirements should be used, either individually or in combination include, type-test qualification, qualification by operating experience, qualification by analysis, combined qualification. These methods qualification principles, procedures and documents are discussed. (N.T.). 1 fig

  12. Simulator training effectiveness: instructor training and qualifications

    International Nuclear Information System (INIS)

    Scholand, G.W.

    1985-01-01

    Nuclear power plant simulators have become the most important tool in training nuclear power plant operators. Yet, as these machines continue to become even more sophisticated, highly trained and experienced instructors with unique skills and insights are still essential in order to achieve effective and meaningful training. The making of a qualified simulator instructor involves training and techniques that exceed the traditional programs required of a Senior Reactor Operator (SRO). This paper discusses (i) the training necessary to produce a competent simulator instructor; and (ii) the continuing task of maintaining his or her proficiency. (author)

  13. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1994-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  14. Guidelines for seismic qualification by experience in ALWRs

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.

    1993-01-01

    The methodologies and acceptance criteria for seismic qualification of equipment are provided in IEEE Std. 344 endorsed by the Nuclear Regulatory Commission (NRC) in the Standard Review Plan. The IEEE Standard allows seismic qualification by use of the similarity analysis method. Data available from past earthquake events or vibration tests can be used in this regard. The nuclear industry has collected a vast amount of earthquake experience and test data in the last decade, and is planning to use it for seismic qualification of equipment in advanced light water reactor (ALWR) plants. This paper discusses the existing data bases including their limitations and describes the ways these data bases can be used for equipment qualification in ALWR plants

  15. Safety review for seismic qualification on nuclear power plant equipment

    International Nuclear Information System (INIS)

    Fang Qingxian

    1995-01-01

    The standards and requirements for seismic qualification of nuclear power plant's component have been fully addressed, including the scope of seismic qualification, the approach and the method of common seismic qualification, the procedure of the seismic tests, and the criteria for the seismic qualification review. The problems discovered in the safety review and the solution for these problems and some other issues are also discussed

  16. Reaction Qualifications Revisited

    DEFF Research Database (Denmark)

    Lippert-Rasmussen, Kasper

    2009-01-01

    to a person's effectiveness by causing a favourable reaction in customers, co-workers etc. (for short: recipients) - are involved, this assumption is false. Building on work by Wertheimer, Mason, and Miller, this paper proposes an account of the reaction qualifications that count, from the point of view...... preferences, recipients should not respond to the applicant actually hired on the basis of their (the recipients') racial preferences. My account decomposes the meritocratic ideal into four separate norms, one of which applies to recipients rather than to selectors. Finally, it defends the view that reaction...... qualifications based on antimeritocratic reactions, while not unproblematic, are not entirely irrelevant from the point of view of merit. Notably, selectors need not discount them when no one - including the targets of the objectionable preferences - is unfairly disadvantaged. Because not all problematic...

  17. QUALIFICATIONS FRAMEWORKS FOR LIFELONG LEARNING CONQUERING THE WORLD?

    Directory of Open Access Journals (Sweden)

    Arjen Deij

    2014-01-01

    Full Text Available The paper reveals the international prospects of developing and spreading the qualifications frameworks across the globe. It introduces the key terms and concepts related to the given issue, and examines both the benefits and challenges of qualifications frameworks implementation. The author looks into the origins and causes of the worldwide interest in qualifications framework application, and gives the overview of related recent publications and their conclusions to reinforce the provided argumentation.

  18. Qualification of safety-related valve actuators

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This Standard describes the qualification of all types of power-driven valve actuators, including damper actuators, for safety-related functions in nuclear power generating stations. It may also be used to separately qualify actuator components. This Standard establishes the minimum requirements for, and guidance regarding, the methods and procedures for qualification of all safety-related functions of power-driven valve actuators

  19. Qualification of software and hardware

    International Nuclear Information System (INIS)

    Gossner, S.; Schueller, H.; Gloee, G.

    1987-01-01

    The qualification of on-line process control equipment is subdivided into three areas: 1) materials and structural elements; 2) on-line process-control components and devices; 3) electrical systems (reactor protection and confinement system). Microprocessor-aided process-control equipment are difficult to verify for failure-free function owing to the complexity of the functional structures of the hardware and to the variety of the software feasible for microprocessors. Hence, qualification will make great demands on the inspecting expert. (DG) [de

  20. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    International Nuclear Information System (INIS)

    Sarkimo, M.; Pitkaenen, J.

    2013-12-01

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  1. Background information for NDT qualification of Finnish disposal canisters of spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Sarkimo, M. [VTT Technical Research Centre of Finland, Espoo (Finland); Pitkaenen, J.

    2013-12-15

    This report presents a review to basic concepts, which are applied in the qualification of non-destructive testing (NDT) techniques. The qualification systems developed and used in some countries are briefly described in the beginning of the report. Anyway the report mainly discusses the qualification practices applied in the Finnish nuclear industry. The Finnish Radiation and Nuclear Safety Authority (STUK) in the YVL Guide 3.8 define the Finnish qualification approach applied for the in-service inspections. The principles presented in this document follow the views of the international organisations: Nuclear Regulator Working Group (NRWG) and European Network for Inspection and Qualification (ENIQ). For the practical qualification work a national guideline is established using so called SP-documents that include specific rules and instructions for execution of qualifications in accordance with YVL Guide 3.8 principles. Altogether the Finnish qualification system can be seen very well to follow the European (ENIQ) methodology. The report discusses several qualification terms and documents. Thus the normally necessary tasks and parts of a qualification are described. The qualification can be seen as a project that includes several tasks, which will be performed by different parties. Enough resources and time should be reserved for the planning and control of a qualification project to ensure its fluent progress. Some tasks are discussed in the report taking into account the situation in the qualification cases that are seen to be linked to the inspections of disposal canisters of spent fuel. (orig.)

  2. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  3. Europeans come together on qualification

    International Nuclear Information System (INIS)

    Whittle, J.

    1996-01-01

    Utilities operating nuclear power plants in Europe have formed the European Network for Inspection Qualification (ENIQ) to produce a common approach to demonstrating that non-destructive testing is capable providing the information to ensure the absence of significant defects in nuclear plants. Major developments over recent months have included the issue by ENIQ of a formal document defining the methodology for the conduct of qualification which sets out the principles that detailed systems, within an individual country context, should embody. A pilot study on pipe welds typical of those in BWR recirculation loops is being conducted to explore the issues involved in the practical application of the methodology. In parallel with ENIQ, the European Nuclear Regulators Working Group has set up a Task Force in an attempt to define a common regulatory position on non-destructive testing qualifications and has produced its own document which is wider in scope than that of ENIQ. (UK)

  4. Simulation for estimation of hydrogen sulfide scavenger injection dose rate for treatment of crude oil

    Directory of Open Access Journals (Sweden)

    T.M. Elshiekh

    2015-12-01

    Full Text Available The presence of hydrogen sulfide in the hydrocarbon fluids is a well known problem in many oil and gas fields. Hydrogen sulfide is an undesirable contaminant which presents many environmental and safety hazards. It is corrosive, malodorous, and toxic. Accordingly, a need has been long left in the industry to develop a process which can successfully remove hydrogen sulfide from the hydrocarbons or at least reduce its level during the production, storage or processing to a level that satisfies safety and product specification requirements. The common method used to remove or reduce the concentration of hydrogen sulfide in the hydrocarbon production fluids is to inject the hydrogen sulfide scavenger into the hydrocarbon stream. One of the chemicals produced by the Egyptian Petroleum Research Institute (EPRI is EPRI H2S scavenger. It is used in some of the Egyptian petroleum producing companies. The injection dose rate of H2S scavenger is usually determined by experimental lab tests and field trials. In this work, this injection dose rate is mathematically estimated by modeling and simulation of an oil producing field belonging to Petrobel Company in Egypt which uses EPRI H2S scavenger. Comparison between the calculated and practical values of injection dose rate emphasizes the real ability of the proposed equation.

  5. Qualification of class 1e equipment: regulation, technological margins and test experience

    International Nuclear Information System (INIS)

    Pasco, Y.; Le Meur, M.; Henry, J.Y.; Droger, J.P.; Morange, E.; Roubault, J.

    1986-10-01

    French regulation requires licensee to qualify electrical equipment important to safety for service in nuclear power plants to ensure that the equipment can perform its safety function under the set of plausible operating conditions. The French regulatory texts entitled Fundamental safety rules have classified safety related electrical equipment in three main categories: k1, k2, k3, according to their location and operating conditions. The definition of a design basis accident test profile must account for margins applied to thermal hydraulic code outputs. Specific safety margins was added to cover uncertainties in qualification test representativity. Up to now, accidental sequence studies have shown the validity of such a qualification test profile. On the other hand, the results from post accident simulation tests have shown that it is useful not only to validate post accident operating life but also to reveal failures initiated during previous tests [fr

  6. List of reports from the BMFT, CEA, EPRI, JSTA and USNRC concerning reactor safety research

    International Nuclear Information System (INIS)

    1981-09-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning special Problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA) the Japan Science and Technology Agency (JSTA) the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Saftety Research Program of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  7. Strategy for Qualification of the Plutonium Immobilized Form

    International Nuclear Information System (INIS)

    Marra, J.C.; Marra, S.L.; Bibler, N.E.; Strachan, D.M.; Shaw, H.F.

    1998-01-01

    In order to dispose of a radioactive waste form in a federal high- level waste repository, a waste form qualification strategy and program must be developed. The waste form qualification program must include the acceptance specifications for the product, show how compliance with these specifications will be met, and then demonstrate compliance. An important element of this program is developing a measure to demonstrate product consistency. For the can- in-canister option, waste form qualification is needed not only for the Pu immobilized form but also for the high-level waste glass canister containing the Pu waste form. The latter will require close interaction and coordination with the U.S. Department of Energy - Office of Environmental Management (DOE-EM) who, through their contractor at the Savannah River Site (SRS), is the producer of the high-level waste form at the Defense Waste Processing Facility (DWPF). In this paper a waste form qualification strategy for the plutonium ceramic form is described that utilizes, as much as possible, the qualification strategy successfully used for vitrified high-level waste

  8. Qualification of cables to IEEE standards 323-1974 and 383-1974

    International Nuclear Information System (INIS)

    Hosticka, C.; Kingsbury, E.R.; Bruhin, A.C.

    1980-01-01

    Wire and Cable manufacturers generally qualify products for class IE application by envelope type testing to user specifications and environmental conditions recommended by IEEE Standards 323-1974 and 383-1974. The General Electric Wire and Cable Business Department recently completed two such qualification programs. Cable constructions tested were 600V control cables and 600 V, 2kV, and 15kV power cables insulated with flame resistant mineral filled crosslinked polyethylene. The 15kV samples included taped field splices. In the second test program, the steam pressure-temperature profile included a simulated main steam line break. Test specimens were wrapped on grounded mandrels and were electrically loaded throughout the simulated LOCA tests. After completion of environmental testing, samples were subjected to the IEEE 383 simulated post-LOCA test. 6 refs

  9. Qualification of cables to IEEE standards 323-1974 and 383-1974

    International Nuclear Information System (INIS)

    Hosticka, C.; Kingsbury, E.R.; Bruhin, A.C.

    1980-01-01

    Wire and Cable manufacturers generally qualify products for class IE application by envelope type testing to user specifications and environmental conditions recommended by IEEE Standards 323-1974 and 383-1974. The General Electric Wire and Cable Business Department recently completed two such qualification programs. Cable constructions tested were 600V control cables and 600 V, 2KV, and 15KV power cables insulated with flame resistant mineral filled crosslinked polyethylene. The 15KV samples included taped field splices. In the second test program, the steam pressure-temperature profile included a simulated main steam line break. Test specimens were wrapped on grounded mandrels and were electrically loaded throughout the simulated LOCA tests. After completion of environmental testing, samples were subjected to the IEEE 383 simulated post-LOCA test. 6 refs

  10. 49 CFR 214.349 - Training and qualification of watchmen/lookouts.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification of watchmen/lookouts...) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.349 Training and qualification of watchmen/lookouts. (a) The training and qualification for...

  11. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Smith, A.C.

    1999-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  12. SRS H1616 Hydride Transport Vessel Qualification Report

    International Nuclear Information System (INIS)

    Van Alstine, M.N.

    1998-01-01

    This report serves as the design qualification basis for both transport and facility use. Headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use

  13. EPRI BWR Water Chemistry Guidelines Revision

    International Nuclear Information System (INIS)

    Garcia, Susan E.; Giannelli, Joseph F.

    2014-01-01

    BWRVIP-190: BWR Water Chemistry Guidelines – 2008 Revision has been revised. The revision committee consisted of U.S. and non-U.S. utilities (members of the BWR Vessel and Internals Protection (BWRVIP) Mitigation Committee), reactor system manufacturers, fuel suppliers, and EPRI and industry experts. The revised document, BWRVIP-190 Revision 1, was completely reformatted into two volumes, with a simplified presentation of water chemistry control, diagnostic and good practice parameters in Volume 1 and the technical bases in Volume 2, to facilitate use. The revision was developed in parallel and in coordination with preparation of the Fuel Reliability Guidelines Revision 1: BWR Fuel Cladding Crud and Corrosion. Guidance is included for plants operating under normal water chemistry (NWC), moderate hydrogen water chemistry (HWC-M), and noble metal application (GE-Hitachi NobleChem™) plus hydrogen injection. Volume 1 includes significant changes to BWR feedwater and reactor water chemistry control parameters to provide increased assurance of intergranular stress corrosion cracking (IGSCC) mitigation of reactor materials and fuel reliability during all plant conditions, including cold shutdown (≤200°F (93°C)), startup/hot standby (>200°F (93°C) and ≤ 10%) and power operation (>10% power). Action Level values for chloride and sulfate have been tightened to minimize environmentally assisted cracking (EAC) of all wetted surfaces, including those not protected by hydrogen injection, with or without noble metals. Chemistry control guidance has been enhanced to minimize shutdown radiation fields by clarifying targets for depleted zinc oxide (DZO) injection while meeting requirements for fuel reliability. Improved tabular presentations of parameter values explicitly indicate levels at which actions are to be taken and required sampling frequencies. Volume 2 provides the technical bases for BWR water chemistry control for control of EAC, flow accelerated corrosion

  14. Integrated Information System for Higher Education Qualifications

    Directory of Open Access Journals (Sweden)

    Catalin Ionut SILVESTRU

    2012-10-01

    Full Text Available In the present article we aim to study thoroughly and detail aspects related to architectures specific for e-learning and management of human resources training interconnected to management of qualifications. In addition, we take into consideration combining e-learning architectures with software in an e-learning system interconnected with the National Registry of Qualifications of Higher Education, in view of developing and information system that correlates educational supply from higher education from Romania with labor market demands through qualifications. The scientific endeavor consists of original architectural solutions to integrate data, systems, processes, services from various sources and to use them in the proposed system. The practical result of the scientific endeavor is represented by design of architectures required for developing an e-learning system interconnected with the National Registry of Qualifications from Romania, which involve in first stage the qualifications provided by higher education. The proposed innovative solution consists in the fact that the proposed information system combines the advantages of content management system (CMS with learning content management system (LCMS and with reusable learning objects (RLO. Thus, the architecture proposed in the research ensures the integration of a content management system with a portal for information, guidance and support in making a professional project. The integration enables correlation of competences with content areas and specific items from various teaching subjects, thus evaluating the usefulness for this registry from learning/educational perspective. Using the proposed information system in enables correlation among qualifications, content of educational program and continuous self-evaluation opportunities, which facilitate monitoring of progress and adjustment of learning content.

  15. Developing competence based qualification system in the nuclear energy sector

    International Nuclear Information System (INIS)

    Ceclan, Mihail

    2016-01-01

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  16. Developing competence based qualification system in the nuclear energy sector

    Energy Technology Data Exchange (ETDEWEB)

    Ceclan, Mihail [European Commission, Petten (Netherlands). Inst. for Energy and Transport

    2016-04-15

    The Institute for Energy and Transport of the Joint Research Centre, European Commission, developed a strategy and road map for ECVET implementation. The JRC road map for European Credit System for Vocational Education and Training (ECVET) implementation has reached the stage of Competence-Based Qualification System development. The Competence-Based Qualification System can help bridge the gap between Human Resources demand and supply in the nuclear market by structuring qualifications in small independent parts. This very specific ECVET feature of a qualification, facilitates the process of competences accumulation and the lifelong learning, mobility and flexible learning pathways. New developments are presented about the Competence-Based Qualification System development for the nuclear energy sector.

  17. A system for personnel qualification of non-destructive testing procedures from testing and and qualification system in Sweden

    International Nuclear Information System (INIS)

    Kuna, M.; Kubis, S.; Plasek, J.

    1999-01-01

    The method for qualification of non-destructive testing personnel carrying out inspections by means of ultrasonic and eddy-current tests to inspect cladding in BWR reactor pressure vessel and core shroud lid. Development of procedures tests with real artificial cracks, blind tests. Evaluation of results by the Swedish Qualification Commission. Performance of the tests at Oskarshamn-1

  18. Radiological Control Technician: Standardized technician Qualification Standard

    International Nuclear Information System (INIS)

    1992-10-01

    The Qualification Standard states and defines the knowledge and skill requirements necessary for successful completion of the Radiological Control Technician Training Program. The standard is divided into three phases: Phase I concerns RCT Academic training. There are 13 lessons associated with the core academics program and 19 lessons associated with the site academics program. The staff member should sign the appropriate blocks upon successful completion of the examination for that lesson or group of lessons. In addition, facility specific lesson plans may be added to meet the knowledge requirements in the Job Performance Measures (JPM) of the practical program. Phase II concerns RCT core/site practical (JPMs) training. There are thirteen generic tasks associated with the core practical program. Both the trainer/evaluator and student should sign the appropriate block upon successful completion of the JPM. In addition, facility specific tasks may be added or generic tasks deleted based on the results of the facility job evaluation. Phase III concerns the oral examination board successful completion of the oral examination board is documented by the signature of the chairperson of the board. Upon completion of all of the standardized technician qualification requirements, final qualification is verified by the student and the manager of the Radiological Control Department and acknowledged by signatures on the qualification standard. The completed Qualification Standard shall be maintained as an official training record

  19. Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

    Science.gov (United States)

    Cockrell, Charles E.; Taylor, James L.; Patterson, Alan; Stephens, Samuel E.; Tyson, Richard W.; Hueter, Uwe

    2009-01-01

    The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as

  20. 10 CFR 50.76 - Licensee's change of status; financial qualifications.

    Science.gov (United States)

    2010-01-01

    ... the financial qualifications information that would be required for obtaining an initial operating license as specified in § 50.33(f)(2). The financial qualifications information must address the first... 10 Energy 1 2010-01-01 2010-01-01 false Licensee's change of status; financial qualifications. 50...

  1. Test report: Electron-proton spectrometer qualification test unit, qualification test

    Science.gov (United States)

    Vincent, D. L.

    1972-01-01

    Qualification tests of the electron-proton spectrometer test unit are presented. The tests conducted were: (1) functional, (2) thermal/vacuum, (3) electromagnetic interference, (4) acoustic, (5) shock, (6) vibration, and (7) humidity. Results of each type of test are presented in the form of data sheets.

  2. KBTAC: EPRI's center to assist the nuclear industry to apply the knowledge-based technology

    International Nuclear Information System (INIS)

    Lin, Chinglu; Naser, J.A.; Sun, B.K.H.

    1993-01-01

    The nuclear utility industry's complex engineering and procedure systems offer many opportunities for use of the knowledge-based technology such as expert systems and neural networks. The ability of expert systems to enhance human experts makes them an important tool in the areas of engineering, operations and maintenance. However, many current industry applications are research projects or turnkey systems supplied by vendors. These often do not impart to utility technical staff a clear understanding of the capabilities of knowledge-based systems (KBS). More importantly, simply using completed applications does not meet utilities' need to acquire the capabilities to build their own knowledge-based systems. Thus, EPRI is supporting its member utilities utilization of knowledge-based technology for power plant engineering, operations, and maintenance applications through the establishment of the Knowledge-Based Technology Application Center (KBTAC)

  3. Program plan for environmental qualification of mechanical and dynamic (including seismic) qualification of mechanical and electrical equipment program (EDQP)

    International Nuclear Information System (INIS)

    Weidenhamer, G.H.

    1986-06-01

    The equipment qualification program described in this plan is intended to provide the technical basis for resolving uncertainties in existing equipment qualification standards. In addition, research results are contributing to the resolution of safety issues GI-23, GI-87, USI-A44, titled, ''Reactor Coolant Pump Seal Failure,'' ''Failure of HPCI Steam Line Without Isolation,'' and ''Station Blackout,'' respectively. Also, research effort is being directed at providing information on the behavior of containment isolation valves under severe accident environments. Although the results of the latter research will not contribute to resolving uncertainties in qualification standards, it has proven cost effective to obtain this information under this program

  4. AGR-1 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Machael

    2009-01-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010

  5. Cement waste form qualification report: WVDP [West Valley Demonstration Project] PUREX decontaminated supernatant

    International Nuclear Information System (INIS)

    McVay, C.W.; Stimmel, J.R.; Marchetti, S.

    1988-08-01

    This report provides a summary of work performed to develop a cement-based, low-level waste formulation suitable for the solidification of decontaminated high-level waste liquid produced as a by-product of PUREX spent fuel reprocessing. The resultant waste form is suitable for interim storage and is intended for ultimate disposal as low-level Class C waste; it also meets the stability requirements of the NRC Branch Technical Position on Waste Form Qualification, May 1983 and the requirements of 10 CFR 61. A recipe was developed utilizing only Portland Type I cement based on an inorganic salts simulant of the PUREX supernatant. The qualified recipe was tested full scale in the production facility and was observed to produce a product with entrained air, low density, and lower-than-expected compressive strength. Further laboratory scale testing with actual decontaminated supernatant revealed that set retarders were present in the supernatant, precluding setting of the product and allowing the production of ''bleed water.'' Calcium nitrate and sodium silicate were added to overcome the set retarding effect and produced a final product with improved performance when compared to the original formulation. This report describes the qualification process and qualification test results for the final product formulation. 7 refs., 38 figs., 21 tabs

  6. T25 Qualification of old containers

    International Nuclear Information System (INIS)

    Hoerning, T.; Kasparek, E.M.; Voelzke, H.

    2013-01-01

    Radioactive waste for final disposal in the repository Konrad has to be packaged in licensed containers. The qualification of containers is performed according the respective standards and BfS requirements. The latter ones differ for different container types with respect to accident resistance based on the release behavior of the waste. Usually qualification of container types is performed before series production. The qualification of already produced containers (''old containers'') is significantly more complicated. The differences of quality assurance and materials properties of the older containers have to be evaluated. A main tool for this evaluation is the numerical re-calculation of accident scenarios for estimation of the safety margins. The validation of appropriate finite element models is available. Based on these date it might be possible to abandon additional drop tests with the existing old containers to prove the structural integrity.

  7. Inspection procedure and essential parameters in NDT qualification

    International Nuclear Information System (INIS)

    Sarkimo, M.

    2000-06-01

    The objective of the inspection qualification is to ensure that applied non-destructive methods (NDT) have the required performance. The approach of the qualification process is systematic and carefully documented and therefore some new requirements can be seen concerning the composition of the documentation. There are also new document types, that only application of the inspection qualification requires. The most important of these is the technical justification, that includes the documented evidences concerning the performance of the inspection system. This publication includes two reports: 'Compilation of the inspection procedure' and 'Essential/influential parameters in NDT qualification'. The former of these discusses the issues to be considered in an inspection procedure especially from the point of view of the mechanised ultrasonic testing. The later report explains the parameters formulated to analyse in the technical justification all aspects of the inspection application. (orig.)

  8. Qualification of phased array ultrasonic examination on T-joint weld of austenitic stainless steel for ITER vacuum vessel

    Energy Technology Data Exchange (ETDEWEB)

    Kim, G.H. [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Park, C.K., E-mail: love879@hanmail.net [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Jin, S.W.; Kim, H.S.; Hong, K.H.; Lee, Y.J.; Ahn, H.J.; Chung, W. [ITER Korea, National Fusion Research Institute, Daejeon 305-333 (Korea, Republic of); Jung, Y.H.; Roh, B.R. [Hyundai Heavy Industries Co. Ltd., Ulsan 682-792 (Korea, Republic of); Sa, J.W.; Choi, C.H. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France)

    2016-11-01

    Highlights: • PAUT techniques has been developed by Hyundai Heavy Industries Co., LTD (HHI) and Korea Domestic Agency (KODA) to verify and settle down instrument calibration, test procedures, image processing, and so on. As the first step of development for PAUT technique, Several dozens of qualification blocks with artificial defects, which are parallel side drilled hole, embedded lack of fusion, embedded repair weld notch, and so on, have been designed and fabricated to simulate all potential defects during welding process. Real UT qualification group-1 for T-joint weld was successfully conducted in front of ANB inspector. • In this paper, remarkable progresses of UT qualification are presented for ITER vacuum vessel. - Abstract: Full penetration welding and 100% volumetric examination are required for all welds of pressure retaining parts of the ITER Vacuum Vessel (VV) according to RCC-MR Code and French Order of Nuclear Pressure Equipment (ESPN). The NDE requirement is one of important technical issues because radiographic examination (RT) is not applicable to many welding joints. Therefore the ultrasonic examination (UT) has been selected as an alternative method. Generally the UT on the austenitic welds is regarded as a great challenge due to the high attenuation and dispersion of the ultrasonic signal. In this paper, Phased array ultrasonic examination (PAUT) has been introduced on double sided T-shape austenitic welds of the ITER VV as a major NDE method as well as RT. Several dozens of qualification blocks with artificial defects, which are parallel side drilled hole, embedded lack of fusion, embedded repair weld notch, embedded parallel vertical notch, and so on, have been designed and fabricated to simulate all potential defects during welding process. PAUT techniques on the thick austenitic welds have been developed taking into account the acceptance criteria. Test procedure including calibration of equipment is derived and qualified through

  9. Qualification, certification and training systems of a Japanese nuclear power plant supplier

    International Nuclear Information System (INIS)

    Yoshijima, S.; Tomita, J.; Yoneda, Y.

    1982-01-01

    Training and indoctrination of personnel are very important for performing quality assurance activities in nuclear power plants. The paper presents policies, procedures and practices with regard to a training system for site construction workers, a training system for plant operation personnel at a special facility, and services and activities for operating plants. The training system for site workers and technicians offers basic training for all workers, and special training and qualification for field welders, cable-termination workers and non-destructive examination personnel. In addition to the qualification system for field welders applied by the regulatory body, a privat-company qualification system exists. Also, a training centre for BWR operators has been established. This facility has a simulator duplicating the main control room of an actual plant and a computer-assisted instruction system. Standard training courses, short-term basic courses, re-training courses, group training courses and special training courses are held at the training centre. Finally, the services and activities performed by Toshiba Corporation for operating plants are described. These activities of the plant supplier aim at keeping up and further enhancing the safety and reliability of operating plants and mainly consist of: (1) collection and evaluation of plant operation data, with re-evaluation and improvement of systems and components; (2) development of new maintenance techniques; (3) development of measures for reducing annual outage periods; and (4) plant emergency preparedness. (author)

  10. Update on the EPRI power generation risk-based inservice inspection pilot plant studies

    International Nuclear Information System (INIS)

    Gosselin, S.R.

    1997-01-01

    The scope for ASME Section XI ISI programs is largely based on deterministic results contained in design stress reports. These reports are normally very conservative and may not be an accurate representation of failure potential. Service experience has shown that failures are due to either corrosion or fatigue and typically occur in areas not included in the plant's ISI program. Consequently, nuclear plants are devoting significant resources to inspection programs that provide minimum benefit. As an alternative, significant industry attention has been devoted to the application of risked-based selection criteria in order to determine the scope of inservice inspection (ISI) programs at nuclear power plants. Preliminary EPRI studies indicate that the application of these techniques will allow operating nuclear plants to reduce the examination scope of current ISI programs by as much as 60 to 80%, significantly reduce costs, and continue to maintain high nuclear plant safety standards

  11. Components Qualification for a Possible use in the Mu2e Calorimeter Waveform Digitizer

    Energy Technology Data Exchange (ETDEWEB)

    Di Falco, S. [INFN, Pisa; Donati, S. [INFN, Pisa; Morescalchi, L. [INFN, Pisa; Pedreschi, E. [INFN, Pisa; Pezzullo, G. [INFN, Pisa; Spinella, F. [INFN, Pisa

    2017-03-30

    The Mu2e experiment at Fermilab searches for the charged flavor violating conversion of a muon into an electron in the Coulomb field of a nucleus. The detector consists of a straw tube tracker and a CSI crystal electromagnetic calorimeter, both housed in a superconducting solenoid. Both the front-end and the digital electronics, located inside the cryostat, will be operated in vacuum under a 1 T magnetic field, having to sustain the high flux of neutrons and ionizing particles coming from the muons stopping target. These harsh experimental conditions make the design of the calorimeter waveform digitizer quite challenging. All the selected commercial devices must be tested individually and qualified for radiation hardness and operation in high magnetic field. At the moment the expected particles flux and spectra at the digitizers location are not completely simulated and we are using initial rough estimates to select the components for the first prototype. We are gaining experience in the qualification procedures using the selected components but the choice will be frozen only when dose and neutron flux simulations will be completed. The experimental results of the first qualification campaign are presented.

  12. Similarity principles for seismic qualification of equipment by experience data

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1989-01-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data is that available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application and verification of the procedures are given for actual test data available from previous qualifications. The developments are intended to elaborate on the rather broad guidelines by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. The results also contribute to filling a gap that exists between the IEEE 344 methodology and that which was previously developed for equipment in existing plants by the Seismic Qualification Utilities Group. 10 refs., 9 figs., 1 tab

  13. EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines: Technical Papers

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, T. [Alden Research Laboratory, Inc., Holden, MA (United States)

    2011-12-01

    The EPRI-DOE Conference on Environmentally-Enhanced Hydropower Turbines was a component of a larger project. The goal of the overall project was to conduct the final developmental engineering required to advance the commercialization of the Alden turbine. As part of this effort, the conference provided a venue to disseminate information on the status of the Alden turbine technology as well as the status of other advanced turbines and research on environmentally-friendly hydropower turbines. The conference was also a product of a federal Memorandum of Understanding among DOE, USBR, and USACE to share technical information on hydropower. The conference was held in Washington, DC on May 19 and 20, 2011 and welcomed over 100 attendees. The Conference Organizing Committee included the federal agencies with a vested interest in hydropower in the U.S. The Committee collaboratively assembled this conference, including topics from each facet of the environmentally-friendly conventional hydropower research community. The conference was successful in illustrating the readiness of environmentally-enhanced hydropower technologies. Furthermore, the topics presented illustrated the need for additional deployment and field testing of these technologies in an effort to promote the growth of environmentally sustainable hydropower in the U.S. and around the world.

  14. Qualification Practices in Nuclear Industry: Steam Generator Eddy Current Probe Qualification

    International Nuclear Information System (INIS)

    Vavrous, M.; Gracin, R.

    2010-01-01

    Through history of nuclear power plant operation, a large number of nuclear power plant forced outages related to tube failures occurred. It resulted with large amount of repair and outage costs, what initiated implementation of regulated practice of periodical tube examination and tube condition monitoring. Purpose of examinations is to detect existing or potential tube degradations that could affect tube integrity and therefore result in forced outages and unwanted costs related to emergency repair activities and loss of ability for electrical power production. With increased examination activities, additional information about steam generator tube condition became available and additional methods for ensuring tube integrity became available. As the number of examination solutions increased, need for validation and assessment of examination methods occurred. For that purpose, a large number of standards and guidelines with its requirements were implemented in nuclear industry regulatory requirements to ensure that adequately validated examinations are applied. With this purpose, qualification requirements for inspection activities were implemented with other requirements. With progress of technology, progress was also achieved in examination methods and more advanced examination methods and advanced inspection systems were developed. This advancement is accompanied by advancement in regulatory requirements regarding inspection and monitoring of tube integrity and condition. Ultimate goal of implementation of qualification processes and its requirements in all aspects of nuclear industry is to achieve minimal rate of forced outages, which would ensure maximum electrical power production capabilities and maximum optimization of operational costs while maintaining safe operation in accordance with environmental policies. This article will focus on qualification of steam generator eddy current bobbin probe.(author).

  15. 49 CFR 391.11 - General qualifications of drivers.

    Science.gov (United States)

    2010-10-01

    ... understand highway traffic signs and signals in the English language, to respond to official inquiries, and... QUALIFICATIONS OF DRIVERS AND LONGER COMBINATION VEHICLE (LCV) DRIVER INSTRUCTORS Qualification and... motor vehicle unless he/she is qualified to drive a commercial motor vehicle. Except as provided in...

  16. 29 CFR 1926.1076 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Qualifications of dive team. 1926.1076 Section 1926.1076 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... § 1926.1076 Qualifications of dive team. Note: The requirements applicable to construction work under...

  17. Review of qualifications for fuel assembly fabrication

    International Nuclear Information System (INIS)

    Slabu, Dan; Zemek, Martin; Hellwig, Christian

    2013-01-01

    The required quality of nuclear fuel in industrial production can only be assured by applying processes in fabrication and inspection, which are well mastered and have been proven by an appropriate qualification. The present contribution shows the understanding and experiences of Axpo with respect to qualifications in the frame of nuclear fuel manufacturing and reflects some related expectations of the operator. (orig.)

  18. Qualification tests for PWR control element drive mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new.

  19. Qualification tests for PWR control element drive mechanism

    International Nuclear Information System (INIS)

    Kim, In Yong; Jin, Choon Eon; Choi Suhn

    1996-01-01

    It is necessary to perform the qualification test for the magnetic jack type CEDM to show the design compatibility because the CEDM is composed of many mechanical and electrical components complicatedly. ABB-CE performed various qualification tests during the development of the System80 CEDM to which Korea Standard Nuclear Plant (KSNP) CEDM referred. The qualification test for the CEDM is classified into the performance test and the dynamic test. The performance test is to verify operability of the CEDM, and the dynamic test is to find dynamic characteristics and to verify the structural integrity if the CEDM for the seismic accidents. Described in this report are the test requirements, the test facilities and the test methods for the performance and the dynamic qualification tests of the PWR magnetic jack type CEDM. The impacts of the design changes in the Korea Next Generation Reactor (KNGR) on the KSNP CEDM were analyzed to present the necessity for the tests. This report also proposes the facilities to perform the tests in KAERI including reasonable schedule for the tests. Attached to this report is the summary of qualification tests of System 80 CEDM performed by ABB-CE. 20 figs., 16 tabs., 21 refs. (Author) .new

  20. Re-qualification of switchgear equipment following field modification

    International Nuclear Information System (INIS)

    Tulk, J.D.; El Bestawi, M.A.

    1984-01-01

    A set of 4.16 kV switchgear was seismically qualified by shaker table test for use in a nuclear power plant. Later, the equipment was modified by the addition of two extra switches and enclosures. This paper describes the methods used to extend the qualification achieved in the original proof test to the new configuration. Qualification of the modified switchgear depended on demonstrating that the intensity of the shaking that would be experienced by equipment mounted in the extended enclosure during a design basis earthquake (DBE) would be no stronger than the shaking that occurred during the original qualification testing. This was accomplished by a combination of analysis and experiment. Natural frequencies and mode-shapes of the original and extended enclosure structures were determined through in-situ modal tests on the equipment. Mathematical models based on the experimental results were then used for dynamic analyses which generated two sets of in-equipment response spectra: one set representing the original qualification test; and one set representing the response of the modified equipment to a hypothetical DBE. Qualification was confirmed by demonstrating that the test-based response spectra for the original configuration exceeded the response spectra developed for the extended structure subjected to DBE level excitation

  1. Workshop on environmental qualification of electric equipment

    International Nuclear Information System (INIS)

    Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J.

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing

  2. Workshop on environmental qualification of electric equipment

    Energy Technology Data Exchange (ETDEWEB)

    Lofaro, R.; Gunther, W.; Villaran, M.; Lee, B.S.; Taylor, J. [comps.] [Brookhaven National Lab., Upton, NY (United States)

    1994-05-01

    Questions concerning the Environmental Qualification (EQ) of electrical equipment used in commercial nuclear power plants have recently become the subject of significant interest to the US Nuclear Regulatory Commission (NRC). Initial questions centered on whether compliance with the EQ requirements for older plants were adequate to support plant operation beyond 40 years. After subsequent investigation, the NRC Staff concluded that questions related to the differences in EQ requirements between older and newer plants constitute a potential generic issue which should be evaluated for backfit, independent of license renewal activities. EQ testing of electric cables was performed by Sandia National Laboratories (SNL) under contract to the NRC in support of license renewal activities. Results showed that some of the environmentally qualified cables either failed or exhibited marginal insulation resistance after a simulated plant life of 20 years during accident simulation. This indicated that the EQ process for some electric cables may be non-conservative. These results raised questions regarding the EQ process including the bases for conclusions about the qualified life of components based upon artificial aging prior to testing.

  3. Spanish program of advanced Nuclear Power Plants

    International Nuclear Information System (INIS)

    Marco, M.; Redon, R.

    1993-01-01

    The energy Spanish Plan is promoting some actions within the area of advanced reactors. Efforts are focussed onto the European Program of Advanced Reactors, the Program of Passive Plants (EPRI), European Fast Reactor Project and the APWR-1000 Program of INI. Electrical sector utilities and industrial partners supported by the Administration have organized an steering committee. The program of Passive Plants includes activities on Qualification, design and detailed engineering (Qualification project, SBWR project of G.E. and AP600 Project of Westinghouse. The european project on advanced plants has the following Spanish contribution: Analysis of alternative Dossier on European requisites (EUR) and Design of an European Reactor (EPR)

  4. List of reports on reactor safety research of BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1984-07-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning special problems in the field of reactor safety research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programm of the BMFT, reporting organization. The list of reports appears quarterly. Requests for reports should be addressed to GRS, Forschungsbetreuung. Contractual points of view have to be considered for the distribitution of the reports. (orig.) [de

  5. The common project for completion of Bubbler Condenser Qualification (Bohunice, Mochovce, Dukovany and Paks NPPs)

    International Nuclear Information System (INIS)

    Jaroslav, H.; Pavol, B.

    2003-01-01

    Described is the common project for completion of bubbler condenser qualification for nuclear power plants in Bohunice, Mochovice, Dukovany and Paks. Functionality of the bubbler condenser was elaborated during the simulation of the main steam line brake, medium break and small break LOCA. On this basis the appropriate operation of bubbler condenser containment under accident conditions can be positively confirmed

  6. 14 CFR 135.247 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Flight Crewmember Requirements § 135.247 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as pilot in command of an aircraft carrying...

  7. 49 CFR 214.343 - Training and qualification, general.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Training and qualification, general. 214.343... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY Roadway Worker Protection § 214.343 Training and qualification, general. (a) No employer shall assign an employee to perform the duties of a...

  8. 27 CFR 19.823 - Changes after original qualification.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Changes after original... Vaporizing Process Qualification Documents § 19.823 Changes after original qualification. When there is a change in the information recorded in the original approved application, the proprietor shall make a...

  9. Benchmarking of epithermal methods in the lattice-physics code EPRI-CELL

    International Nuclear Information System (INIS)

    Williams, M.L.; Wright, R.Q.; Barhen, J.; Rothenstein, W.; Toney, B.

    1982-01-01

    The epithermal cross section shielding methods used in the lattice physics code EPRI-CELL (E-C) have been extensively studied to determine its major approximations and to examine the sensitivity of computed results to these approximations. The study has resulted in several improvements in the original methodology. These include: treatment of the external moderator source with intermediate resonance (IR) theory, development of a new Dancoff factor expression to account for clad interactions, development of a new method for treating resonance interference, and application of a generalized least squares method to compute best-estimate values for the Bell factor and group-dependent IR parameters. The modified E-C code with its new ENDF/B-V cross section library is tested for several numerical benchmark problems. Integral parameters computed by EC are compared with those obtained with point-cross section Monte Carlo calculations, and E-C fine group cross sections are benchmarked against point-cross section descrete ordinates calculations. It is found that the code modifications improve agreement between E-C and the more sophisticated methods. E-C shows excellent agreement on the integral parameters and usually agrees within a few percent on fine-group, shielded cross sections

  10. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  11. An investigation of individual functionality football referees qualifications

    Directory of Open Access Journals (Sweden)

    S.M. Berezka

    2014-12-01

    Full Text Available Purpose: determine the level of individual functionality referees qualifications. Objective of the study was to determine the physiological parameters characterizing the functionality of football referees qualifications. Material : mainly experiment involved 29 highly qualified referees aged 21-45 years. In the main experiment participated 29 referees and 40 assistant referees (n = 69 Ukrainian Premier League. Results: found that the means and methods that use Ukrainian football referee high qualification in the special physical training for a competition, are not effective enough. Consequence of poorly planned training process is to increase the number of wrong decisions of the referees during the match associated with poor motor activity. Conclusions: data obtained in the course of educational research confirmed our theory about the necessity of individualization process special physical training qualifications of referees, which would entail increasing the functional and motor abilities of the referees, and as a consequence of better and successful completion of the work.

  12. Buried Waste Program (BWP) data qualification manual

    International Nuclear Information System (INIS)

    Casey, C.; Larson, R.A.; Harris, G.A.

    1989-06-01

    The Data Qualification Manual (DQM) has been developed to discuss the process required to qualify data generated for the Buried Waste Program (BWP). The data from the BWP tasks conducted at the Radioactive Waste Management Complex (RWMC) and elsewhere will lead to remedial decisions being made which are governed by federal regulations administered by the Environmental Protection Agency (EPA). Data qualification is the process of insuring that only data of planned and known qualities are used to make a decision or answer a question. Although it is the Data Integrity Review Committee's (DIRC) responsibility to insure that the quality of all BWP data is ultimately verified and validated, all personnel who participate in the data gathering process will affect the quality of the data and must be responsible for knowing what is required to produce data of the planned quality. Therefore this manual is addressed to all participants in a data-gathering task. This manual discusses requirements to support data qualification in several areas, including: the sampling and analysis plan; data quality objectives and PARCC goals; sample custody documentation; quality assurance; assembly of the data qualification package; and existing data. 23 refs., 4 figs., 6 tabs

  13. AGR-1 Data Qualification Report

    International Nuclear Information System (INIS)

    Abbott, Michael

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office (TDO) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor experiment (AGR-1), the processing of these data within NDMAS, and reports the qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. They include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent quality assurance program. The NDMAS database processing and qualification status of the following five data streams is reported in this document: (1) Fuel fabrication data. All data have been processed into the NDMAS database and qualified (1,819 records). (2) Fuel irradiation data. Data from all 13 AGR-1 reactor cycles have been processed into the NDMAS database and tested. Of these, 85% have been qualified and 15% have failed NDMAS accuracy testing. (3) FPMS data. Reprocessed (January 2010) data from all 13 AGR-1 reactor cycles have been processed into the database and capture tested. Final qualification of these data will be recorded after QA approval of an Engineering Calculations and Analysis Report currently

  14. Report on the Regulators Experience of NDT Qualification for In-service Inspection of Nuclear Components

    International Nuclear Information System (INIS)

    2003-08-01

    In November 1992, the Nuclear Regulators Working Group (NRWG) decided to set up a task force on qualification of non-destructive testing (NDT) systems for pre and in-service inspection of light water reactors. The first task was to agree on the philosophy and principles governing the qualification of techniques, equipment, software, procedures, and personnel for NDT to be used for the inspection of structural components that are important to safety in nuclear power plants; and to establish a common view on essential aspects of NDT qualifications. The first task, which also included a comparison of the common views of the European regulators with the qualification approach outlined in Appendix VIII to Section XI of the ASME Code, was completed in 1996. The result was published in the report ''Common position of European regulators on qualification of NDT systems for pre- and in-service inspection of light water reactor components''2. In parallel, the European nuclear power industries had set up a working group, the European Network for Inspection Qualification (ENIQ), to discuss and agree on how to perform inspection qualifications. In 1995, ENIQ finalized its first version of ''European methodology for qualification of non-destructive tests''3. A second version 4 was then published in 1997. This second version is in relatively close agreement with the principles given in the regulators common position document. With these two basic documents, a platform was established for the further development of qualification strategies in the European countries. The second task of the NRWG Task Force was to follow and evaluate the first ENIQ pilot study from a regulatory point of view. The objective of this pilot study was to explore ways of how to apply the European qualification methodology and to test its feasibility. The pilot study commenced late 1996 and was planned to be finalized a year later. Depending on unforeseen difficulties, the pilot study has been delayed

  15. 14 CFR 121.437 - Pilot qualification: Certificates required.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Certificates required... Pilot qualification: Certificates required. (a) No pilot may act as pilot in command of an aircraft (or... pilots) unless he holds an airline transport pilot certificate and an appropriate type rating for that...

  16. 14 CFR 125.285 - Pilot qualifications: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualifications: Recent experience... Requirements § 125.285 Pilot qualifications: Recent experience. (a) No certificate holder may use any person, nor may any person serve, as a required pilot flight crewmember unless within the preceding 90...

  17. Qualification Users' Perceptions and Experiences of Assessment Reliability

    Science.gov (United States)

    Chamberlain, Suzanne

    2013-01-01

    This paper presents the findings of a study designed to explore qualification users' perceptions and experiences of reliability in the context of national assessment outcomes in England. The study consisted of 17 focus groups conducted across six sectors of qualification users: students, teachers, trainee teachers, job-seekers, employers and…

  18. Revision of the qualification framework at the Technical University of Denmark Part 2

    DEFF Research Database (Denmark)

    Henneberg, Kaj-Åge; Kuhn, Luise Theil; Jungersen, Gregers

    2017-01-01

    Using a revised Qualification Framework (QF) with four main categories: -to know, - to be, -to interact, and -to do, this paper demonstrates how to use the elements of the QF to construct Programme-Qualification Matrices. A general Programme- Qualification Matrix defines the qualifications and th...

  19. Questions of qualification exam for non-destructive testing and materials science - the first level

    International Nuclear Information System (INIS)

    Shaaban, H.I.; Addarwish, J.M.A.

    2013-01-01

    The book contains seven chapters: Questions of qualification for magnetic particles testing method - Questions of qualification for liquids penetrant testing method - Questions of qualification for the visual inspection testing method - Questions of qualification for the ultrasonic testing method - Questions of qualification for the eddy current testing method - Questions of rehabilitation for industrial radiographic testing method - Qualification questions about materials science and manufacturing defects of castings and welding and comparison between non-destructive testing methods.

  20. Seismic qualification of existing nuclear installations in India - a proposal

    International Nuclear Information System (INIS)

    Basu, P.C.

    2001-01-01

    In India, the work toward seismic qualification of existing nuclear facilities has been started. Preliminary work is being undertaken with respect to identifying the facilities which would be taken up for seismic qualification, approach and methodology for re-evaluation for seismic safety, acceptance criteria, etc. Work has also been started for framing up the criteria and methodology of the seismic qualification of these facilities. Present paper contains the proposal in this respect. This proposal is on similar lines of the present practice of seismic qualification of NPP, as summarized in the Appendix, but has been modified to suit the special requirements of Indian nuclear installations. (author)

  1. Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38

    Science.gov (United States)

    Griffith, J. S.

    1980-01-01

    Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.

  2. 14 CFR 121.439 - Pilot qualification: Recent experience.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilot qualification: Recent experience. 121... Pilot qualification: Recent experience. (a) No certificate holder may use any person nor may any person serve as a required pilot flight crewmember, unless within the preceding 90 days, that person has made...

  3. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting engineer within the provisions of subpart O of this part, for the purpose of operating a steam-driven hoist...

  4. 32 CFR 935.139 - Motor vehicle operator qualifications.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Motor vehicle operator qualifications. 935.139... AND INSULAR REGULATIONS WAKE ISLAND CODE Motor Vehicle Code § 935.139 Motor vehicle operator qualifications. (a) No person may operate a privately owned motor vehicle on Wake Island unless he has an island...

  5. Skin injuries from discrete radioactive particles: A summary of EPRI-sponsored experiments. Final report

    International Nuclear Information System (INIS)

    Owen, D.E.; Reece, W.D.; Poston, J.W. Sr.; McFarlane, D.L.

    1994-12-01

    In recent years there has been the debate over the risk to nuclear power plant workers from beta radiation-emitting discrete radioactive particles (or DRPs). DRPs-sometimes called open-quotes hot particlesclose quotes-are small, often microscopic, radioactive particles that can adhere to the skin and protective clothing of plant workers. They can potentially produce high radiation doses to very small areas of the skin. Concern is based on the knowledge that various types of nonstochastic skin injuries can result from sufficiently high beta radiation doses. While the effects for large-area irradiations (several square centimeters and larger) are generally well understood, the effects for doses to very small areas are less clear. However, the evidence is clear that the doses required to produce skin injuries from DRP irradiations are significantly larger than the dose limits prescribed in existing regulations for large-area skin exposures. One concern is that nuclear power plant efforts to comply with skin dose limits causes workers to receive unnecessary whole-body radiation exposure. In addition, DRP protection measures focus radiation protection resources on very low risk hazards, and may not be an optimum use of radiation protection resources. EPRI sponsored a series of irradiation experiments to address some of the DRP exposure issues. This report summarizes the results of experiments using sources covering a range of sizes and beta energies, simulating both activation product and fuel-bearing DRPS. NCRP Publication 106 states that all of these small skin injuries are minor, but that acute deep ulceration should be avoided. Accordingly, this research focused on open sores or scabs that remain unhealed for very long times. The ED 50 dose for these injuries was determined to be about 5 krad (50 Gy). A revised guideline might lower whole-body exposures associated with DRP control measures, while not significantly increasing the likelyhood of DRP injuries

  6. Global Trend In The Qualifications Of Medical Educators | Issa ...

    African Journals Online (AJOL)

    NPMCN) or its equivalents is the highest educational and professional qualification of clinical Medical Educators in Nigeria while PhD is the acceptable highest qualification for their basic medical sciences counterparts. This had been the status ...

  7. Assessing mathematics within advanced school science qualifications

    OpenAIRE

    McAlinden, Mary; Noyes, Andrew

    2017-01-01

    Following sustained discussion regarding the relationship between advanced mathematics and science learning in England, the government has pursued a reform agenda in which mathematics is embedded in national, high stakes A-level science qualifications and their assessments for 18-year-olds. For example, A-level Chemistry must incorporate the assessment of relevant mathematics for at least 20% of the qualification. Other sciences have different mandated percentages. This embedding policy is ru...

  8. SRNL PHASE 1 Assessment Of The WTP Waste Qualification Program

    International Nuclear Information System (INIS)

    Peeler, D.; Hansen, E.; Herman, C.; Marra, S.; Wilmarth, B.

    2012-01-01

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Project is currently transitioning its emphasis from an engineering design and construction phase toward facility completion, start-up and commissioning. With this transition, the WTP Project has initiated more detailed assessments of the requirements that must be met during the actual processing of the Hanford Site tank waste. One particular area of interest is the waste qualification program. In general, the waste qualification program involves testing and analysis to demonstrate compliance with waste acceptance criteria, determine waste processability, and demonstrate laboratory-scale unit operations to support WTP operations. The testing and analysis are driven by data quality objectives (DQO) requirements necessary for meeting waste acceptance criteria for transfer of high-level wastes from the tank farms to the WTP, and for ensuring waste processability including proper glass formulations during processing within the WTP complex. Given the successful implementation of similar waste qualification efforts at the Savannah River Site (SRS) which were based on critical technical support and guidance from the Savannah River National Laboratory (SRNL), WTP requested subject matter experts (SMEs) from SRNL to support a technology exchange with respect to waste qualification programs in which a critical review of the WTP program could be initiated and lessons learned could be shared. The technology exchange was held on July 18-20, 2011 in Richland, Washington, and was the initial step in a multi-phased approach to support development and implementation of a successful waste qualification program at the WTP. The 3-day workshop was hosted by WTP with representatives from the Tank Operations Contractor (TOC) and SRNL in attendance as well as representatives from the US DOE Office of River Protection (ORP) and the Defense Nuclear Facility Safety Board (DNFSB) Site Representative office. The purpose of the

  9. Fuel model studies. Comparison of our present version of GAPCON-THERMAL-2 with results from the EPRI code comparison study. Partial report

    International Nuclear Information System (INIS)

    Malen, K.; Jansson, L.

    1978-08-01

    Runs with our present version of GAPCON-THERMAL-2 have been compared to results from the EPRI code comparison study. Usually also our version of GAPCON predicts high temperatures, 100-300 K or 10-15% higher than average code predictions and experimental results. The well-known temperaturegas release instablility is found also with GAPCON. In this case one identifies the gas release limits 1400 deg C and 1700 deg C as instablility points. (author)

  10. Understanding interdisciplinary health care teams: using simulation design processes from the Air Carrier Advanced Qualification Program to identify and train critical teamwork skills.

    Science.gov (United States)

    Hamman, William R; Beaudin-Seiler, Beth M; Beaubien, Jeffrey M

    2010-09-01

    In the report "Five Years After 'To Err is Human' ", it was noted that "the combination of complexity, professional fragmentation, and a tradition of individualism, enhanced by a well-entrenched hierarchical authority structure and diffuse accountability, forms a daunting barrier to creating the habits and beliefs of common purpose, teamwork, and individual accountability for successful interdependence that a safe culture requires". Training physicians, nurses, and other professionals to work in teams is a concept that has been promoted by many patient safety experts. However the model of teamwork in healthcare is diffusely defined, no clear performance metrics have been established, and the use of simulation to train teams has been suboptimal. This paper reports on the first three years of work performed in the Michigan Economic Development Corporation (MEDC) Tri-Corridor life science grant to apply concepts and processes of simulation design that were developed in the air carrier industry to understand and train healthcare teams. This work has been monitored by the American Academy for the Advancement of Science (AAA) and is based on concepts designed in the Advanced Qualification Program (AQP) from the air carrier industry, which trains and assesses teamwork skills in the same manner as technical skills. This grant has formed the foundation for the Center of Excellence for Simulation Education and Research (CESR).

  11. 29 CFR 1910.410 - Qualifications of dive team.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Qualifications of dive team. 1910.410 Section 1910.410... Requirements § 1910.410 Qualifications of dive team. (a) General. (1) Each dive team member shall have the experience or training necessary to perform assigned tasks in a safe and healthful manner. (2) Each dive team...

  12. AGR-2 Data Qualification Interim Report

    International Nuclear Information System (INIS)

    Abbott, Michael L.

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  13. AGR-2 Data Qualification Interim Report

    Energy Technology Data Exchange (ETDEWEB)

    Michael L. Abbott

    2010-09-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

  14. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    Energy Technology Data Exchange (ETDEWEB)

    Spaang, Kjell [Ingemansson Technology AB, Goeteborg (Sweden); Staahl, Gunnar [Westinghouse Atom, Vaesteraas (Sweden)

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components.

  15. Qualification of Electrical Components in Nuclear Power Plants. Management of Ageing

    International Nuclear Information System (INIS)

    Spaang, Kjell; Staahl, Gunnar

    2002-05-01

    This report reviews R and D results and experiences forming the bases for the preparation of a report on management of ageing. It includes basic information and descriptions of value for persons who work with the questions and some data from investigations of the ageing characteristics of various materials: limit levels, dose-rate effects, activation energies, methods for condition monitoring, etc. This report is restricted to safety related components containing ageing sensitive parts, mainly organic materials (polymers). For components located in the containment, the possibilities of continuous supervision are limited. The accessibility for regular inspections is also limited in many cases. Therefore, the main part of this report deals with the qualification of such components. In addition, some material is given on qualification located outside containment with better possibilities for frequent inspection and supervision. A survey is made of activities, programs and tools for ageing qualification in connection with initial environmental qualification (type testing) as well as after installation (condition monitoring, extension of qualified life through on-going qualification). Tools are also given for supplementary ageing qualification of already installed components

  16. Economies of using seismic experience data qualification methods at Department of Energy facilities

    International Nuclear Information System (INIS)

    Loceff, F.; Antaki, G.; Goen, L.

    1995-01-01

    This paper summarizes the implementation of the seismic qualification of existing equipment using experience data techniques. The emphasis is on the economies of this approach compared with standard qualification methods of analysis and testing or replacement with qualified equipment. Seismic qualification of existing equipment using experience data is a technical necessity and is the most economically attractive of the options. Representative costs for seismic qualification at two facilities show costs are substantially lower than the costs for qualification using conventional methods. Because of the experience to date, the authors recommend that the Department of Energy continue to sponsor the Existing Facilities Program for applying qualification using experience data techniques at DOE facilities

  17. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  18. Qualifications of Subject Teachers in Special Education Schools

    Science.gov (United States)

    Rasmussen, Meryem Uçar; Kis, Arzu

    2018-01-01

    Teacher qualifications are essential to be able to teach children with special needs efficiently. Therefore the aim of this study is to determine the qualifications of subject teachers in special education schools in Turkey. In the study 20 subject teachers within the field of music, art and sports who worked in special education schools in Turkey…

  19. List of reports in the field of reactor safety research of BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1990-05-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning single problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programme of the BMFT, reporting organization. The list of reports appears quarterly. (orig.) [de

  20. List of reports in the field of reactor safety research from BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1991-08-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning single problems in the field of reactor safety research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Program of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  1. List of reports in the field of reactor safety research of BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1990-02-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning single problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programm of the BMFT, reporting organization. The list of reports appears quarterly. (orig.) [de

  2. List of reports in the field of reactor safety research of BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1989-05-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning single problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programme of the BMFT, reporting organization. The list of reports appears quarterly. (orig.) [de

  3. List of reports in the field of reactor safety research of BMFT, CEA, EPRI, JSTA und USNRC

    International Nuclear Information System (INIS)

    1989-11-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning single problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commissariat a l'Engergie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programme of the BMFT, reporting organization. The list of reports appears quarterly. (orig.) [de

  4. List of reports of BMFT, CEA, EPRI, JSTA and USNRC in the field of reactor safety research

    International Nuclear Information System (INIS)

    1985-04-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning special problems in the field of Reactor Safety Research. According to the cooperation of the Bundesminister fuer Forschung und Technologie (BMFT) with the Commisariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electrical Power Research Institute (EPRI) and the United States Nuclear Regulatory Commision, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programm of the BMFT, reporting organization. The list of reports appears quaterly. (orig./HP) [de

  5. 14 CFR 121.909 - Approval of Advanced Qualification Program.

    Science.gov (United States)

    2010-01-01

    ... criteria. Each AQP must have separate curriculums for indoctrination, qualification, and continuing... the training and evaluation of CRM and technical skills and knowledge. An application for approval of... must meet all the requirements of this subpart. (2) Each indoctrination, qualification, and continuing...

  6. 42 CFR 21.47 - Examination; anticipation of meeting qualifications.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Examination; anticipation of meeting qualifications. 21.47 Section 21.47 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES PERSONNEL COMMISSIONED OFFICERS Appointment § 21.47 Examination; anticipation of meeting qualifications. A...

  7. Pyro shock simulation: Experience with the MIPS simulator

    Science.gov (United States)

    Dwyer, Thomas J.; Moul, David S.

    1988-01-01

    The Mechanical Impulse Pyro Shock (MIPS) Simulator at GE Astro Space Division is one version of a design that is in limited use throughout the aerospace industry, and is typically used for component shock testing at levels up to 10,000 response g's. Modifications to the force imput, table and component boundary conditions have allowed a range of test conditions to be achieved. Twelve different designs of components with weights up to 23 Kg are in the process or have completed qualification testing in the Dynamic Simulation Lab at GE in Valley Forge, Pa. A summary of the experience gained through the use of this simulator is presented as well as examples of shock experiments that can be readily simulated at the GE Astro MIPS facility.

  8. Acoustic Analysis and Design of the E-STA MSA Simulator

    Science.gov (United States)

    Bittinger, Samantha A.

    2016-01-01

    The Orion European Service Module Structural Test Article (E-STA) Acoustic Test was completed in May 2016 to verify that the European Service Module (ESM) can withstand qualification acoustic environments. The test article required an aft closeout to simulate the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA) cavity, however, the flight MSA design was too cost-prohibitive to build. NASA Glenn Research Center (GRC) had 6 months to design an MSA Simulator that could recreate the qualification prediction MSA cavity sound pressure level to within a reasonable tolerance. This paper summarizes the design and analysis process to arrive at a design for the MSA Simulator, and then compares its performance to the final prediction models created prior to test.

  9. 5 CFR 531.212 - Superior qualifications and special needs pay-setting authority.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Superior qualifications and special needs... Appointment Or Position Changes § 531.212 Superior qualifications and special needs pay-setting authority. (a) Agency authority. (1) An agency may use the superior qualifications and special needs pay-setting...

  10. Investigation of reliability of EC method for inspection of VVER steam generator tubes

    International Nuclear Information System (INIS)

    Corak, Z.

    2004-01-01

    Complete and accurate non-destructive examinations (NDE) data provides the basis for performing mitigating actions and corrective repairs. It is important that detection and characterization of flaws are done properly at an early stage. EPRI Document PWR Steam Generator Examination Guidelines recommends an approach that is intended to provide the following: Ensure accurate assessment of steam generator tube integrity; Extend the reliable, cost effective, operating life of the steam generators, and Maximize the availability of the unit. Steam Generator Eddy Current Data Analysis Performance Demonstration represents the culmination of the intense two-year industry effort in the development of a performance demonstration program for eddy current testing (ECT) of steam generator tubing. It is referred to as the Industry Database (IDB) and provides a capability for individual organizations to implement SG ECT performance demonstration programs in accordance with the requirements specified in Appendices G and H of the ISI Guidelines. The Appendix G of EPRI Document PWR Steam Generator Examination Guidelines specifies personnel training and qualification requirements for NDE personnel who analyze NDE data for PWR steam generator tubing. Its purpose is to insure a continuing uniform knowledge base and skill level for data analysis. The European methodology document is intended to provide a general framework for development of qualifications for the inspection of specific components to ensure they are developed in a consistent way throughout Europe while still allowing qualification to be tailored in detail to meet different nation requirements. In the European methodology document one will not find a detailed description of how the inspection of a specific component should be qualified. A recommended practice is a document produced by ENIQ to support the production of detailed qualification procedures by individual countries. VVER SG tubes are inspected by EC method but a

  11. Qualification of box HEPA filters for nuclear applications

    International Nuclear Information System (INIS)

    Bergman, W.; Larsen, G.; Wilson, K.; Rainer, F.

    1995-03-01

    We have successfully completed qualification tests on high efficiency particulate air (HEPA) filters that are encapsulated within a box and manufactured by American Air Filters. The qualification tests are required by the American Society of Mechanical Engineers Standard ASME N509 and the U.S. Military Standard MIL-F-51068 for HEPA filters to be used in nuclear applications. The qualification tests specify minimum filter efficiencies following exposure to heated air, overpressure, and rough handling. Prior to this study, no box HEPA filters from any manufacturer had been qualified despite their wide-spread use in Department of Energy (DOE) facilities. Box HEPA filters are not addressed in any of the existing HEPA standards and only briefly discussed in the Nuclear Air Cleaning Handbook

  12. Qualifications manual for Inspection and Enforcement personnel. Volume I. Detailed data sheets

    International Nuclear Information System (INIS)

    Bartley, H.J.; Heyer, F.H.K.; Schwartz, E.G.; Harrison, O.J.; Krass, I.W.; Welsh, D.M.

    1978-06-01

    This document is the General Research Corporation (GRC) final report on Task I Job/Position Qualifications Statements for the Headquarters and regional position of NRC/IE. It reflects the results of upgrading, expanding, and reformating the preliminary Task I report. To accomplish this, GRC made a thorough examination of all data developed during Task I, Task II (Career Fields), Task III (Training Evaluation), and Task IV (Hiring Qualifications), to include NRC/IE comments and management decisions received. The reformated Job/Position Qualifications Statements resulting from this effort (Appendix A) identify three job qualifications categories for each position--performance, attributes, and knowledge. Two formats are provided: a summarized one for manpower management in Volume I and a detailed one for career and training management in Volume II. In addition to recommending approval of the job/position qualifications, GRC proposes their use in conjunction with the hiring qualifications in the Task IV report to update NRC/IE job descriptions

  13. Experience on environmental qualification of safety-related components for Darlington Nuclear Generating Station

    International Nuclear Information System (INIS)

    Yu, A.S.; Kukreti, B.M.

    1987-01-01

    The proliferation of Nuclear Power Plant safety concerns has lead to increasing attention over the Environmental Qualification (EQ) of Nuclear Power Plant Safety-Related Components to provide the assurance that the safety related equipment will meet their intended functions during normal operation and postulated accident conditions. The environmental qualification of these components is also a Licensing requirement for Darlington Nuclear Generating Station. This paper provides an overview of EQ and the experience of a pilot project, in the qualification of the Main Moderator System safety-related functions for the Darlington Nuclear Generating Station currently under construction. It addresses the various phases of qualification from the identification of the EQ Safety-Related Components List, definition of location specific service conditions (normal, adbnormal and accident), safety-related functions, Environmental Qualification Assessments and finally, an EQ system summary report for the Main Moderator System. The results of the pilot project are discussed and the methodology reviewed. The paper concludes that the EQ Program developed for Darlington Nuclear Generating Station, as applied to the qualification of the Main Moderator System, contained all the elements necessary in the qualification of safety-related equipment. The approach taken in the qualification of the Moderator safety-related equipment proves to provide a sound framework for the qualification of other safety-related components in the station

  14. Qualifications Frameworks and Their Conflicting Social Imaginaries of Globalisation

    Science.gov (United States)

    Louise Sarauw, Laura

    2012-01-01

    Critics often see the European Bologna Process as a univocal standardisation of higher education. By exploring how different qualifications frameworks project different social imaginaries of globalisation, this article takes a different stance. The overarching qualifications framework of the Bologna Process rests on a socially constituted and…

  15. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  16. Qualification of electrical equipment. A United States nuclear system supplier perspective

    International Nuclear Information System (INIS)

    Jordan, W.G.

    1978-01-01

    At Westinghouse Pressurized Water Reactor Systems Division (PWR-SD) qualification. of safety related electrical equipment can be segregated into three distinct generations: (1) the initial seismic and environmental qualification programs for electrical equipment (1969-1972); (2) the supplemental sismic and environmental qualification programs (1975-1977); and (3) the seismic and environmental qualification programs to meet IEEE-323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations''(1975). The latter two programs (in a licensing framework), as they are most current, with emphasis on electrical equipment (e.g. transmitters, rack mounted equipment) as opposed to electro-mechanical equipment (valve operators, pump motors) are reviewed. (author)

  17. Pre-qualification of brazed plasma facing components of divertor target elements for ITER like tokamak application

    International Nuclear Information System (INIS)

    Singh, K.P.; Pandya, Santosh P.; Khirwadkar, S.S.; Patel, Alpesh; Patil, Y.; Buch, J.J.U.; Khan, M.S.; Tripathi, Sudhir; Pandya, Shwetang; Govindrajan, J.; Jaman, P.M.; Rathore, Devendra; Rangaraj, L.; Divakar, C.

    2011-01-01

    Qualification of tungsten (W) and graphite (C) based brazed plasma facing components (PFCs) is an important R and D area in fusion research. Pre-qualification tests for brazed joints between W-CuCrZr and C-CuCrZr using NDT (IR thermography and ultrasonic test) and thermal fatigue test are attempted. Mockups having good quality brazed joints of W and C based PFCs were identified using NDT. Subsequently, thermal fatigue test was performed on the identified mockups. All brazed tiles of W based PFC mockups could withstand thermal fatigue test, however, few tiles of C based PFC mockup were found detached. Thermal analyses of mockups are performed using finite element analysis (ANSYS) software to simulate the thermal hydraulic condition with 10 MW/m 2 uniform heat flux. Details about experimental and computational work are presented here.

  18. Pre-qualification of brazed plasma facing components of divertor target elements for ITER like tokamak application

    Energy Technology Data Exchange (ETDEWEB)

    Singh, K.P., E-mail: kpsingh@ipr.res.in [Institute for Plasma Research, Bhat, Gandhinagar, Gujarat (India); Pandya, Santosh P.; Khirwadkar, S.S.; Patel, Alpesh; Patil, Y.; Buch, J.J.U.; Khan, M.S.; Tripathi, Sudhir; Pandya, Shwetang; Govindrajan, J. [Institute for Plasma Research, Bhat, Gandhinagar, Gujarat (India); Jaman, P.M.; Rathore, Devendra; Rangaraj, L.; Divakar, C. [Materials Science Division, National Aerospace Laboratories, CSIR, Bangalore, Karnataka (India)

    2011-10-15

    Qualification of tungsten (W) and graphite (C) based brazed plasma facing components (PFCs) is an important R and D area in fusion research. Pre-qualification tests for brazed joints between W-CuCrZr and C-CuCrZr using NDT (IR thermography and ultrasonic test) and thermal fatigue test are attempted. Mockups having good quality brazed joints of W and C based PFCs were identified using NDT. Subsequently, thermal fatigue test was performed on the identified mockups. All brazed tiles of W based PFC mockups could withstand thermal fatigue test, however, few tiles of C based PFC mockup were found detached. Thermal analyses of mockups are performed using finite element analysis (ANSYS) software to simulate the thermal hydraulic condition with 10 MW/m{sup 2} uniform heat flux. Details about experimental and computational work are presented here.

  19. Licensing requirements regarding the qualification of operating personnel in nuclear power plants

    International Nuclear Information System (INIS)

    Fechner, J.B.

    1981-01-01

    The legal requirements regarding the qualifications of operating personnel in nuclear power plants in the Federal Republic of Germany are outlined as in article 7 of the Atomic Energy Act. For the responsible operating personnel the requisite competence and reliability are legally required; for subordinate personnel the law requires only the necessary knowledge. The requisite competence and the necessary knowledge have been further specified in a set of guidelines by the authorities; work on specification of reliability requirements is under way. Essential elements of the requisite competence of responsible operating personnel are their professional qualification, their safety-related knowledge, their abilities, their practical experience, and - for the responsible shift personnel - their nuclear, plant-related training as well as a written and oral examination. Requalification is indispensible for keeping the requisite competence on a level in accordance with the current state of science and technology. Facts concerning the personal reliability of the responsible operating personnel are assessed by the competent authorities on the basis of information available at other state institutions. For the responsible shift personnel, physical and psychological fitness are important factors contributing to their reliability. The necessary knowledge subordinate operating personnel must possess with respect to plant safety and safety of the personnel is assured via instruction on safety and via special briefings at the working place. Lack of safety-related knowledge has to be compensated for by assigning an experienced permanent supervisor for each activity in question. Current work on qualification of operating personnel concentrates on training, including simulator training, of responsible shift personnel. (author)

  20. ENIQ: European Network for Inspection Qualification: Status report

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Crutzen, S.; Lemaitre, P.

    1998-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In this paper the main activities, organisation and actual status of ENIQ are discussed. (author)

  1. European methodology for qualification of NDT as developed by ENIQ

    International Nuclear Information System (INIS)

    Champigny, F.; Sandberg, U.; Engl, G.; Crutzen, S.; Lemaitre, P.

    1997-01-01

    The European Network for Inspection Qualification (ENIQ) groups the major part of the nuclear power plant operators in the European Union (and Switzerland). The main objective of ENIQ is to co-ordinate and manage at European level expertise and resources for the qualification of NDE inspection systems, primarily for nuclear components. In the framework of ENIQ the European methodology for qualification of NDT has been developed. In this paper the main principles of the European methodology are given besides the main activities and organisation of ENIQ. (orig.)

  2. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  3. 12 CFR 231.3 - Qualification as a financial institution.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Qualification as a financial institution. 231.3... RESERVE SYSTEM NETTING ELIGIBILITY FOR FINANCIAL INSTITUTION (REGULATION EE) § 231.3 Qualification as a financial institution. (a) A person qualifies as a financial institution for purposes of sections 401-407 of...

  4. Lower-Level Qualifications as a Stepping Stone for Young People. Occasional Paper

    Science.gov (United States)

    Oliver, Damian

    2012-01-01

    Lower-level qualifications (certificate I and II programs) provide little or no immediate return to the individual in terms of increased wages. However, lower-level qualifications are intended to prepare students who would otherwise not be capable of enrolling in and completing a higher-level qualification or making a successful transition into…

  5. Meeting the latest qualification requirements for Class 1E protection system equipment: a practical approach

    International Nuclear Information System (INIS)

    Daigle, R.P.; Breen, R.J.

    1977-01-01

    The requirements for qualifying Class 1E equipment for Nuclear Power Generating Stations were significantly revised in 1974 and 1975. These new requirements reflect the desire of the industry to provide improved methods of determining the qualification of this vital equipment. The revised standards do, in fact, meet these industry goals in a generally acceptable manner. The Nuclear Regulatory Commission is presently requiring utilities to comply with these revised standards and regulatory guides in order to obtain the necessary permits. Manufacturers are developing and implementing programs to comply with the new requirements. One of the more difficult new requirements of qualification is aging to achieve advanced life condition. The objectives and methods described for aging are difficult for much of the equipment within the Protection System. The use of thermal and vibrational techniques to simulate aging is valid for some components (i.e., capacitors, transistors, cable and/or motor insulation) but may be neither valid nor practical for many items (e.g., complete instrument systems, etc.). A seemingly obvious approach, although rarely followed, in regarding new or revised standards is to refrain from making any type of commitment until the standards are thoroughly understood. Often too hasty a decision is made by a utility (concerned about licensing) or a manufacturer (concerned about being competitive) to commit to new requirements. Consequently, the broad range of interpretations that usually develops for a given set of requirements may result in difficult relations between organizations. This paper deals with solutions for qualification in a practical sense, with emphasis on the aging issue and does not elaborate on seismic qualification

  6. Nuclear Criticality Safety Organization qualification program. Revision 4

    International Nuclear Information System (INIS)

    Carroll, K.J.; Taylor, R.G.; Worley, C.A.

    1997-01-01

    The Nuclear Criticality Safety Organization (NCSO) is committed to developing and maintaining a staff of highly qualified personnel to meet the current and anticipated needs in Nuclear Criticality Safety (NCS) at the Oak Ridge Y-12 Plant. This document defines the Qualification Program to address the NCSO technical and managerial qualification as required by the Y-12 Training Implementation Matrix (TIM). It is implemented through a combination of LMES plant-wide training courses and professional nuclear criticality safety training provided within the organization. This Qualification Program is applicable to technical and managerial NCSO personnel, including temporary personnel, sub-contractors and/or LMES employees on loan to the NCSO, who perform the NCS tasks or serve NCS-related positions as defined in sections 5 and 6 of this program

  7. Nuclear criticality safety specialist training and qualification programs

    International Nuclear Information System (INIS)

    Hopper, C.M.

    1993-01-01

    Since the beginning of the Nuclear Criticality Safety Division of the American Nuclear Society (ANS) in 1967, the nuclear criticality safety (NCS) community has sought to provide an exchange of information at a national level to facilitate the education and development of NCS specialists. In addition, individual criticality safety organizations within government contractor and licensed commercial nonreactor facilities have developed training and qualification programs for their NCS specialists. However, there has been substantial variability in the content and quality of these program requirements and personnel qualifications, at least as measured within the government contractor community. The purpose of this paper is to provide a brief, general history of staff training and to describe the current direction and focus of US DOE guidance for the content of training and qualification programs designed to develop NCS specialists

  8. Instructor qualification for radiation safety training at a national laboratory

    International Nuclear Information System (INIS)

    Trinoskey, P.A.

    1994-10-01

    Prior to 1993, Health Physics Training (HPT) was conducted by the Lawrence Livermore National Laboratory (LLNL) health physics group. The job requirements specified a Masters Degree and experience. In fact, the majority of Health Physicists in the group were certified by the American Board of Health Physics. Under those circumstances, it was assumed that individuals in the group were technically qualified and the HPT instructor qualification stated that. In late 1993, the Health Physics Group at the LLNL was restructured and the training function was assigned to the training group. Additional requirements for training were mandated by the Department of Energy (DOE), which would necessitate increasing the existing training staff. With the need to hire, and the policy of reassignment of employees during downsizing, it was imperative that formal qualification standards be developed for technical knowledge. Qualification standards were in place for instructional capability. In drafting the new training qualifications for instructors, the requirements of a Certified Health Physicists had to be modified due to supply and demand. Additionally, for many of the performance-based training courses, registration by the National Registry of Radiation Protection Technologists is more desirable. Flexibility in qualification requirements has been incorporated to meet the reality of ongoing training and the compensation for desirable skills of individuals who may not meet all the criteria. The qualification requirements for an instructor rely on entry-level requirements and emphasis on goals (preferred) and continuing development of technical and instructional capabilities

  9. Sport Management Interns--Selection Qualifications.

    Science.gov (United States)

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1993-01-01

    Examines and rates the background qualifications and qualities, identified by sport management practitioners through an examination of paper credentials, that are desired in interviewees vying for selection into sport management internship positions. (GLR)

  10. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  11. Near-term objectives of the works on the EUR document, comparison with the EPRI-URD

    International Nuclear Information System (INIS)

    Berbey, P.; Lopez, P. T. L.

    2010-01-01

    18 years after its foundation, the EUR organization is still quite active. During the last 3 years, the EUR products have mainly been evaluations of the Gen 3 LWR designs. The evaluations of the AP1000 and of the AES92 designs have been concluded in 2007 and a revised version of the evaluation of the EPR completed in 2009. Other LWR projects of potential interest for the EUR utilities, such as MHI's APWR are being reviewed before starting a full-scope assessment. Last, a revision C of the EUR volume 4 has been published in 2007. Coordinated actions with the other industry groups and the other stakeholders have been a centerpiece of the recent EUR strategy. In particular, the EUR and ENISS organizations have joined their efforts to coordinate their actions in nuclear safety, in particular vs. IAEA and WENRA. Also EUR and WNA/CORDEL have coordinated their efforts, in relation with the MDEP initiative of the safety regulators. Meanwhile, the EUR organization has kept enlarging: CEZ and MVM now are associated members and Gen-Energija from Slovenia has been invited to participate. Education and training has been dealt with actively. The EUR organization strongly supported WNU in setting up their successful 2009 'forum on harmonization'. A more technical course about the EUR requirements is being organized under the aegis of ENEN. Finally, preparatory material for a revision D of the EUR volumes 1 and 2 has been gathered. Out of this material, the update of the comparison between the EUR document and the EPRI-URD is of specific importance. In 1995-1997 a first analysis of the differences between the two documents had been carried out by the EUR organization and a synthesis report focused on 35 'macro issues' had been produced. Ten years later, this work was felt deserving a thorough update. Thus a specific organization has been set out between EUR and EPRI to update the old synthesis report. The 'macro issues' have been re-analyzed by a specific EUR working group leaded

  12. Qualification Paths of Adult Educators in Sweden and Denmark

    Science.gov (United States)

    Andersson, Per; Kopsen, Susanne; Larson, Anne; Milana, Marcella

    2013-01-01

    The qualification of adult educators is a central aspect of the quality of adult education. However, within current policy discourses and adult education research on the professional development of prospective adult educators, little attention is paid to teacher qualification when compared to other fields of education and training. In this study,…

  13. Selection, qualification and training of personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This standard provides criteria for the selection, qualification and training of personnel for stationary nuclear power plants. Qualifications, responsibilities, and training of personnel in operating and support organizations appropriate for the safe and efficient operation of nuclear power plants are addressed

  14. Passive autocatalytic recombiner process features and new status of international qualification

    International Nuclear Information System (INIS)

    Eckardt, Bernd A.; Losch, Norbert

    2010-01-01

    New results of International PAR-Severe Accidents Qualification in frame of EC/IRSN Core Melt Program PHEBUS (with real molten core) are presented. Example Results: AREVA PAR Design: Best performance very fast start-up • highest efficiency absolutely constant hydrogen depletion rates. Others: Some industrial competitors failed. This enveloping real severe accident tests represents the new international PAR qualification standard and finalized the PAR qualification successfully. The design features supports PAR Dual function

  15. Qualification of uranium-molybdenum alloy fuel - conclusions of an international workshop

    International Nuclear Information System (INIS)

    Snelgrove, J.L.; Languille, A.

    2000-01-01

    Thirty-one participants representing 21 reactors, fuel developers, fuel fabricators, and fuel reprocessors in 11 countries discussed the requirements for qualification of U-Mo alloy fuel at a workshop held at Argonne National Laboratory on January 17-18, 2000. Consensus was reached that the qualification plans of the U.S. RERTR program and the French U-Mo fuel development program are valid. The items to be addressed during qualification are summarized in the paper. (author)

  16. The implementing of the training, examination and qualification for QA auditor

    International Nuclear Information System (INIS)

    Ma Xiaozheng; Han Peicong; Zhang Zhongyuan; Zhu Guoliang

    2007-01-01

    China Power Investment Corporation has implemented the training, examination and qualification for QA auditor based on the related requirements of the nuclear safety documents. The bases, planning of the procedure, implementing procedure and suggestions for implementing the training, examination and qualification are described in this article. That can be used as the reference for implementing the training, examination and qualification for QA auditor, as well as for establishment of the related guide. (authors)

  17. Understanding to requirements for educational level in qualification of reactor operators

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhou Limin

    2007-01-01

    Requirements for qualification of reactor operators in nuclear safety regulations were discussed in this paper. The new issue was described in the confirmation of education level of reactor operators. The understanding to the requirements for Educational Level in Qualification of Reactor Operators was provided according to Higher Education Law of the People's Republic of China. It was proposed to improve the confirmation of qualification of reactor operators as soon as possible. (authors)

  18. Helicopter-Ship Qualification Testing

    NARCIS (Netherlands)

    Hoencamp, A.

    2015-01-01

    The goal of this research project is to develop a novel test methodology which can be used for optimizing cost and time efficiency of helicopter-ship qualification testing without reducing safety. For this purpose, the so-called “SHOL-X” test methodology has been established, which includes the

  19. List of reports in the field of reactor safety research sponsored by BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1987-05-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning single problems in the field of reactor safety research. According to the cooperation of the Federal Minister for Research and Technology (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programm of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  20. List of reports in the field of reactor safety research sponsored by BMFT, CEA, EPRI, JSTA and USNRC

    International Nuclear Information System (INIS)

    1987-02-01

    This list reviews reports from the Federal Republic of Germany, from France, from Japan and from the United States of America concerning single problems in the field of reactor safety research. According to the cooperation of the Federal Minister for Research and Technology (BMFT) with the Commissariat a l'Energie Atomique (CEA), the Japan Science and Technology Agency (JSTA), the Electric Power Research Institute (EPRI) and the United States Nuclear Regulatory Commission, these reports are available in the Gesellschaft fuer Reaktorsicherheit (GRS). The list pursues the following order: Country of origin, problem area concerned, according to the Reactor Safety Research Programm of the BMFT, reporting organization. The list of reports appears quarterly. (orig./HP) [de

  1. 12 CFR 563c.3 - Qualification of public accountant.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Qualification of public accountant. 563c.3... REQUIREMENTS Form and Content of Financial Statements § 563c.3 Qualification of public accountant. (See also 17 CFR 210.2-01.) The term “qualified public accountant” means a certified public accountant or licensed...

  2. Unresolved Safety Issue A-46 - seismic qualification of equipment in operating plants

    International Nuclear Information System (INIS)

    Anderson, N.

    1985-01-01

    Seismic Qualification of Equipment in Operating Plants was designated as an Unresolved Safety Issue (USI) in December, 1980. The USI A-46 program was developed in early 1981 to investigate the adequacy of mechanical and electrical equipment in operating plants to withstand a safe shutdown earthquake. The approach taken was to develop viable, cost effective alternatives to current seismic qualification licensing requirements which could be applied to operating nuclear power plants. The tasks investigated include: (1) identification of seismic sensitive systems and equipment; (2) assessment of adequacy of existing seismic qualification methods; (3) development and assessment of in-situ test procedures to assist in qualification of equipment; (4) seismic qualification of equipment using seismic experience data; and (5) development of methods to generate generic floor response spectra. Progress to date and plans for completion of resolution are reported

  3. 78 FR 53025 - Pilot Certification and Qualification Requirements for Air Carrier Operations; Correction

    Science.gov (United States)

    2013-08-28

    ...-0100; Amdt. No. 141-17A] RIN 2120-AJ67 Pilot Certification and Qualification Requirements for Air... regulations to create new certification and qualification requirements for pilots in air carrier operations..., the FAA published a final rule entitled, ``Pilot Certification and Qualification Requirements for Air...

  4. Minimum qualifications for nuclear criticality safety professionals

    International Nuclear Information System (INIS)

    Ketzlach, N.

    1990-01-01

    A Nuclear Criticality Technology and Safety Training Committee has been established within the U.S. Department of Energy (DOE) Nuclear Criticality Safety and Technology Project to review and, if necessary, develop standards for the training of personnel involved in nuclear criticality safety (NCS). The committee is exploring the need for developing a standard or other mechanism for establishing minimum qualifications for NCS professionals. The development of standards and regulatory guides for nuclear power plant personnel may serve as a guide in developing the minimum qualifications for NCS professionals

  5. Qualification of Simulation Software for Safety Assessment of Sodium Cooled Fast Reactors. Requirements and Recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Nicholas R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pointer, William David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sieger, Matt [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Flanagan, George F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Moe, Wayne [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); HolbrookINL, Mark [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    The goal of this review is to enable application of codes or software packages for safety assessment of advanced sodium-cooled fast reactor (SFR) designs. To address near-term programmatic needs, the authors have focused on two objectives. First, the authors have focused on identification of requirements for software QA that must be satisfied to enable the application of software to future safety analyses. Second, the authors have collected best practices applied by other code development teams to minimize cost and time of initial code qualification activities and to recommend a path to the stated goal.

  6. Leveraging DMO’s Hi-Tech Simulation Against the F-16 Flying Training Gap

    Science.gov (United States)

    2005-04-01

    39-49. 6 United States Department of Transportation, Airplance Simulator Qualification, Report AC No.120-40B (Washington, DC: Federal Aviation...and Motion Simulation Conference. Binghamton, NY: Singer-Simulation Products Division, 1976. United States Department of Transportation. Airplance

  7. Generic test procedure for the qualification of a nuclear emergency generator

    International Nuclear Information System (INIS)

    Simonis, J.C.; Bowman, S.W.

    1985-01-01

    This paper describes the proposed analytical and experimental procedures for the qualification of the standby generators and exciters used in the Emergency Diesel Generator Systems in a nuclear power plant. The components which require qualification are identified through a failure mode analysis of the systems conducted using engineering drawings updated to include all field changes. The qualification of each component includes the margins given in IEEE Std. 323-1974, ''Qualifying Class 1E Equipment for Nuclear Power Generating Stations.'' These margins are combined with the plant specific data to define an enveloping set of environmental parameters. This set of enveloping parameters, plus margin, form the bases for the analysis or test qualification tasks. Proposed qualification of the composite electrical insulation systems used in the generator and exciter on the form or random wound coils is by traceable testing. However, before testing the thermal and radiation degradation data used in the design of the generator and exciter are evaluated to identify if these data are sufficiently traceable to eliminate the need for additional insulation tests. The required tests are guided by applicable standards

  8. Updated Liquid Secondary Waste Grout Formulation and Preliminary Waste Form Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Saslow, Sarah A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Um, Wooyong [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Russell, Renee L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Guohui [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Asmussen, Robert M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sahajpal, Rahul [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-07-01

    This report describes the results from liquid secondary waste grout (LSWG) formulation and cementitious waste form qualification tests performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). New formulations for preparing a cementitious waste form from a high-sulfate liquid secondary waste stream simulant, developed for Effluent Management Facility (EMF) process condensates merged with low activity waste (LAW) caustic scrubber, and the release of key constituents (e.g. 99Tc and 129I) from these monoliths were evaluated. This work supports a technology development program to address the technology needs for Hanford Site Effluent Treatment Facility (ETF) liquid secondary waste (LSW) solidification and supports future Direct Feed Low-Activity Waste (DFLAW) operations. High-priority activities included simulant development, LSWG formulation, and waste form qualification. The work contained within this report relates to waste form development and testing and does not directly support the 2017 integrated disposal facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY17, and for future waste form development efforts. The provided data should be used by (i) cementitious waste form scientists to further understanding of cementitious dissolution behavior, (ii) IDF PA modelers who use quantified constituent leachability, effective diffusivity, and partitioning coefficients to advance PA modeling efforts, and (iii) the U.S. Department of Energy (DOE) contractors and decision makers as they assess the IDF PA program. The results obtained help fill existing data gaps, support final selection of a LSWG waste form, and improve the technical defensibility of long-term waste form performance estimates.

  9. Qualification of non-destructive examination for belgian nuclear reactor pressure vessel inspection

    International Nuclear Information System (INIS)

    Couplet, D.; Francoise, T.

    2001-01-01

    In Service Inspection (ISI) participates to the assessment of Nuclear Reactor Pressure Vessel Integrity. The performance of Non Destructive Examination (NDE) techniques must be demonstrated according to predefined objectives. The qualification process is essential to trust the reliability of the information provided by NDE. In Belgian Nuclear Power Plants, the qualification was conducted through a collaboration between the vendor and a technical group from the Electricity Utility. The important facts of this qualification will be presented: - the detailed definition of the inspection and qualifications objectives, based on a combination of the ASME code and the European Methodology for Qualification; - the systematic verification of the NDE performance and limitations, for each ISI objective, through an adequate combination of tests on blocks and technical justification; - the continuous improvement of the NDE procedure; - the feedback and the lessons learnt from site experience; - the necessary multi-disciplinary approach (NDE, degradation mechanisms, structural integrity)

  10. Impact of pre-conditioning on the qualification of safety-related equipment

    International Nuclear Information System (INIS)

    Isgro, J.R.

    1982-01-01

    This paper shares some recent experiences on the effects of preconditioning on the qualification of safety-related equipment not located in a harsh environment. Environmental and seismic qualification testing programs were conducted following the guidelines of IEEE 323-1974, IEEE 344-1975 and appropriate IEEE daughter standards, where available. The examples that follow will illustrate the degree of pre-conditioning of safety-related equipment qualified to the requirements of IEEE-323-1974, and its effect on the outcome of the qualification program

  11. 46 CFR 2.75-70 - Welding procedure and performance qualifications.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Welding procedure and performance qualifications. 2.75... for Construction Personnel § 2.75-70 Welding procedure and performance qualifications. (a) Welding... requirements for the welding of pressure piping, boilers, pressure vessels, and nonpressure vessel type tanks...

  12. Return of IEEE Std 627 and its Value to Equipment Qualification Programs

    International Nuclear Information System (INIS)

    Horvath, D.A.

    2012-01-01

    IEEE Std 627 ''Design Qualification of Safety Systems Equipment Used in Nuclear Power Generating Stations'' was issued to more generically establish qualification requirements in the form of a high level umbrella document. Efforts on this standard began in late 1975 at the request of the IEEE Nuclear Standards Management Board. In 1977 a joint ASME/IEEE agreement established responsibility for qualification and quality assurance standards preparation. ASME accepted responsibility for Quality Assurance and IEEE for qualification. In accordance with that agreement, IEEE completed the generic qualification standard in 1980. This document provided high level approaches, criteria, guidance, and principles for qualification of both electrical and mechanical equipment that at that time appeared in no other industry standard. IEEE Std 627-1980 was later reaffirmed in 1996. In 1986, ASME's Board on Nuclear Codes and Standards directed its Committee on Qualification of Mechanical Equipment (QME) to develop a standard for qualifying mechanical equipment. This task was completed in several parts during the time frame from 1992 to 1994. Partly in response to this activity, IEEE Std 627 was withdrawn in 2002. Later although withdrawn, it was found that IEEE Std 627 was continuing to be used and referenced by many entities both in the US and other countries including in ASME's QME-1-2002 ''Qualification of Active Mechanical Equipment Used in Nuclear Power Plants'', US NRC's NUREG-0800 Standard Review Plan Section 3.11, at least one reactor vendor's Design Certification Document (DCD), several international licensing documents, and elsewhere. As a result, in 2007, the IEEE Standards Board authorized Working Group 2.10 of Subcommittee 2 (Qualification) of the Power and Energy Society's Nuclear Power Engineering Committee to resurrect and update IEEE Std 627-1980 (Reaff 1996). The result was the culmination IEEE Std 627 in 2010. This paper will report on the eight improvements made

  13. 25 CFR 117.26 - Expenses incurred pending qualification of an executor or administrator.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Expenses incurred pending qualification of an executor or... HAVE CERTIFICATES OF COMPETENCY § 117.26 Expenses incurred pending qualification of an executor or administrator. Pending the qualification of the executor or administrator of the estate of a deceased Indian of...

  14. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  15. The path from biomarker discovery to regulatory qualification

    CERN Document Server

    Goodsaid, Federico

    2013-01-01

    The Path from Biomarker Discovery to Regulatory Qualification is a unique guide that focuses on biomarker qualification, its history and current regulatory settings in both the US and abroad. This multi-contributed book provides a detailed look at the next step to developing biomarkers for clinical use and covers overall concepts, challenges, strategies and solutions based on the experiences of regulatory authorities and scientists. Members of the regulatory, pharmaceutical and biomarker development communities will benefit the most from using this book-it is a complete and practical guide to biomarker qualification, providing valuable insight to an ever-evolving and important area of regulatory science. For complimentary access to chapter 13, 'Classic' Biomarkers of Liver Injury, by John R. Senior, Associate Director for Science, Food and Drug Administration, Silver Spring, Maryland, USA, please visit the following site:  http://tinyurl.com/ClassicBiomarkers Contains a collection of experiences of different...

  16. Qualification of flat welding of nuclear fuel bars

    International Nuclear Information System (INIS)

    Romero C, J.; Rivera M, H.

    2001-01-01

    The qualification of flat welding consists in the process (procedures (11), instructions (5), specifications (4) and programs (3)) and equipment (systems (4), equipment (6)) with the Personal Qualification (operators and supervisors) that was done in simultaneous form and supported with test and training programs with its respective technical reports, liberated by the Quality Assurance Office of ININ. Moreover, specific procedures of process and personal qualification are realized with the respective supervision by Quality Assurance Office. For the process, 20 welding were realized as follow: 5 welding with maximum contributing of heat, 10 welding with nominal contributing of heat, 5 welding with minimum contributing of heat. The heat contributing for the qualification was done maximum, of increasing the welding current, diminishing the helium flux and the revolutions per minute of the bar, at the moment of welding, with respect to nominal values. In the minimum contributing of heat it is diminished the welding current, increasing the helium flux and the revolutions per minute of the bar with respect to nominal values. With the qualification it has been finished the development of flat welding with results which define an own method of ININ. It was implemented a pneumatic system, for the elimination of micron cracks. It was required a control of turn velocity of the bar of hundredth of revolution. Moreover the main welding parameters each 40 μs are acquired. Also it was automated completely the process to avoid possible human mistakes. The standard deviations of the values of the realized inspections in the quality, are lower. Process, equipment and personnel with their respective Quality reports and registries are qualified, as well as the Quality certificates of two operators and one supervisor. (Author)

  17. The Humanitarian Action Qualifications Framework: a quality assurance tool for the Humanitarian Sector

    Directory of Open Access Journals (Sweden)

    Bastiaan L. Aardema

    2014-07-01

    Full Text Available The article presents the European Universities on Professionalisation on Humanitarian Action (EUPRHA Project as an initiative that seeks to contribute to the professionalisation and quality assurance of the humanitarian sector. Its purpose is to explain the approach and the process leading to the development of the Humanitarian Action Qualifications Framework as an example of good practice for other sectors aiming at improving the recognition of qualifications as a precondition of academic and professional mobility. With this aim, it introduces the educational and humanitarian trends that led to this project: the move from transnational qualifications frameworks of which the European Qualifications Framework for Lifelong Learning (EQF is the best example to sectoral qualifications frameworks and the increasing demand from the sector seeking to determine the competencies and required skills of a professional humanitarian aid worker. Based on the EQF and the Tuning methodology the framework will act as a translating device to make national and sectoral qualifications more readable and promote humanitarian workers’ and learners’ mobility between countries and organisations. It will facilitate inter-system transparency and recognition of (non-formal and informal learning by linking occupations, skills, competences, and qualifications, thus benefiting the Humanitarian Sector as a whole.

  18. Global National Qualifications Framework Inventory: Country Cases from EU and ETF Partner Countries

    Science.gov (United States)

    Cedefop - European Centre for the Development of Vocational Training, 2013

    2013-01-01

    Certificates, diplomas and titles are commonly known as qualifications. Their purpose is to show employers, training providers, and individuals what the person holding the qualification has learned and can do. Every country issues many different qualifications, but for the European labor market to work as intended--that is for European citizens to…

  19. Qualification and application of nuclear reactor accident analysis code with the capability of internal assessment of uncertainty

    International Nuclear Information System (INIS)

    Borges, Ronaldo Celem

    2001-10-01

    This thesis presents an independent qualification of the CIAU code ('Code with the capability of - Internal Assessment of Uncertainty') which is part of the internal uncertainty evaluation process with a thermal hydraulic system code on a realistic basis. This is done by combining the uncertainty methodology UMAE ('Uncertainty Methodology based on Accuracy Extrapolation') with the RELAP5/Mod3.2 code. This allows associating uncertainty band estimates with the results obtained by the realistic calculation of the code, meeting licensing requirements of safety analysis. The independent qualification is supported by simulations with RELAP5/Mod3.2 related to accident condition tests of LOBI experimental facility and to an event which has occurred in Angra 1 nuclear power plant, by comparison with measured results and by establishing uncertainty bands on safety parameter calculated time trends. These bands have indeed enveloped the measured trends. Results from this independent qualification of CIAU have allowed to ascertain the adequate application of a systematic realistic code procedure to analyse accidents with uncertainties incorporated in the results, although there is an evident need of extending the uncertainty data base. It has been verified that use of the code with this internal assessment of uncertainty is feasible in the design and license stages of a NPP. (author)

  20. Infrared LED Array For Silicon Strip Detector Qualification

    CERN Document Server

    Dirkes, Guido; Hartmann, Frank; Heier, Stefan; Schwerdtfeger, Wolfgang; Waldschmitt, M; Weiler, K W; Weseler, Siegfried

    2003-01-01

    The enormous amount of silicon strip detector modules for the CMS tracker requires a test-sytem to allow qualification of each individual detector module and its front-end electronics within minutes. The objective is to test the detector with a physical signal. Signals are generated in the detector by illumination with lightpulses emitted by a LED at 950~nm and with a rise time of 10~ns. In order to avoid a detector moving, an array of 64 LEDs is used, overlaping the complete detector width. The total length of an array is 15~cm. The spot size of an individual LED is controlled by apertures to illuminate about 25 strips. Furthermore it is possible to simulate the high leakage current of irradiated sensors by constant illumination of the sensor. This provides an effective mean to identfy pinholes on a sensor.

  1. Experience and benefits from using the EPRI MOV Performance Prediction Methodology in nuclear power plants

    International Nuclear Information System (INIS)

    Walker, T.; Damerell, P.S.

    1999-01-01

    The EPRI MOV Performance Prediction Methodology (PPM) is an effective tool for evaluating design basis thrust and torque requirements for MOVs. Use of the PPM has become more widespread in US nuclear power plants as they close out their Generic Letter (GL) 89-10 programs and address MOV periodic verification per GL 96-05. The PPM has also been used at plants outside the US, many of which are implementing programs similar to US plants' GL 89-10 programs. The USNRC Safety Evaluation of the PPM and the USNRC's discussion of the PPM in GL 96-05 make the PPM an attractive alternative to differential pressure (DP) testing, which can be costly and time-consuming. Significant experience and benefits, which are summarized in this paper, have been gained using the PPM. Although use of PPM requires a commitment of resources, the benefits of a solidly justified approach and a reduced need for DP testing provide a substantial safety and economic benefit. (author)

  2. Re-qualification of MTR-type fuel plates fabrication process

    International Nuclear Information System (INIS)

    Elseaidy, I.M.; Ghoneim, M.M.

    2010-01-01

    The fabricability issues with increased uranium loading due to use low enrichment of uranium (LEU), i.e. less than 20 % of U 235 , increase the problems which occur during compact manufacturing, roll bonding of the fuel plates, potential difficulty in forming during rolling process, mechanical integrity of the core during fabrication, potential difficulty in meat homogeneity, and the ability to fabricate plates with thicker core as a means of increasing total uranium loading. To produce MTR- type fuel plates with high uranium loading (HUL) and keep the required quality of these plates, many of qualification process must be done in the commissioning step of fuel fabrication plant. After that any changing of the fabrication parameters, for example changing of any of the raw materials, devises, operators, and etc., a re- qualification process should be done in order to keep the quality of produced plates. Objective of the present work is the general description of the activities to be accomplished for re-qualification of manufacturing MTR- type nuclear fuel plates. For each process to be re-qualified, a detailed of re-qualification process were established. (author)

  3. Emergency Management. Functional Area Qualification Standard

    National Research Council Canada - National Science Library

    2004-01-01

    .... In support of this goal, the competency requirements defined in the Technical Qualification Standards should be aligned with and integrated into the recruitment and staffing processes for technical positions...

  4. Qualification of quality testing personnel, in particular the training offered

    International Nuclear Information System (INIS)

    Knoedler, D.

    1980-01-01

    Personnel qualification is one of the most important tasks of quality assurance. The qualification is reached by professional education, by experience made on the job and by additional external and company-internal training. A determination of qualification requirements should cover only the general principles. Especially this should be considered specifying the requirements for theoretical knowledge and for examinations since the factor of relevant experience is difficult to be estimated by third parties. Equal principles apply for the personnel of the manufacturer, of the main contractor, of the utility and of the auhtorized inspectors' organizations. The detailed guidelines should be part of the internal QA-systems of the organizations involved. (orig.) [de

  5. Fission product data for thermal reactors. Final report. Part 2. Users manual for EPRI-CINDER code and data

    International Nuclear Information System (INIS)

    England, T.R.; Wilson, W.B.; Stamatelatos, M.G.

    1976-12-01

    A four-group fission-product absorption chain library using ENDF/B-IV decay data and cross sections processed with a typical light water reactor spectrum for a modified version of the original CINDER code has been developed as described in Part 1. CINDER is a general point-depletion and fission product code based on an analytical solution of the equations describing nuclides coupled in any linear sequence of radioactive decays and neutron absorptions. The basic code has been in wide use for a number of years. Previously, the user was required to specify all physical data. This report describes the chain library in detail and a modified version of the basic CINDER code (EPRI-CINDER) that is still compatible with existing libraries

  6. Technical evaluation of seismic qualification of safety-related equipment

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Yang Hui; Park, Heong Gee; Park, Yeong Seok [Univ. of Incheon, Incheon (Korea, Republic of)

    1994-04-15

    This study is purposed to evaluate the technical acceptability of the procedures and techniques of seismic qualifications which were performed for the YGN 3 and 4 safety-related equipment.This study is also targeted to suggest a systematized technical procedure guide for the effective performance and review of the seismic qualification, which reflects the most up-to-date licensing requirements and state-of the-art.

  7. Space qualification of an experimental two-phase flow thermal management system

    International Nuclear Information System (INIS)

    Koonmen, J.P.; Carswell, L.C.; Kvansnak, M.A.

    1991-01-01

    The Weapons Laboratory will launch a space experiment in March 1991 to investigate the effects of extended microgravity on two-phase (liquid/vapor) flow. The qualification process for the experimental flight system hardware differs significantly from the process used for complex, high cost, long life space systems. Some development, qualification, and acceptance tests normally included in the test program of an operational space system were omitted because of the low program cost and low consequence of experiment failure. Key environment and functional qualification tests were performed, however, in an effort to reduce the risk of failure inherent in any space mission. The environmental qualification program included short duration vacuum chamber tests, reduced gravity missions onboard a National Aeronautics and Space Administration (NASA) test aircraft, and a complete series of shock and vibration tests. The functional qualification program centered on thermal-hydraulic system performance tests and a complete check-out of the unique telemetry system used to retrieve the experimental data from the payload. The test program also contains a number of acceptance and prelaunch validation tests to be performed as final verification of payloads readiness for spaceflight

  8. Qualification of NDT systems for in-service inspections of nuclear power plant pressure vessels

    International Nuclear Information System (INIS)

    Elfving, K.

    1998-11-01

    The goal of this study is to determine the requirements of the in-service inspection qualification in Europe, their feasibility in practice and to find out possible manufacture defects in test pieces used in practical trials. The literature study consists of qualification requirements set by European regulatory bodies and by the European nuclear power utilities. Also a brief summary of qualification requirements set by ASME Code, Section XI and comparison between ASME and European qualification requirements is included

  9. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  10. Qualifications Frameworks and their conflicting social imaginaries of globalisation

    DEFF Research Database (Denmark)

    Sarauw, Laura Louise

    2013-01-01

    Critics of the European Bologna process often see it as a univocal standardization of higher education. By exploring how different qualifications frameworks currently project unlike imaginaries of and responses to globalisation, this article takes a different stance. As a key point, I argue...... that the well-known imaginary of globalisation as a change towards a more diverse and unforeseeable world, which calls for the development of flexible, lifelong learners with a broad knowledge base and strong democratic competencies that we find in the overarching qualifications framework of the Bologna process......, is a highly contested imaginary. In contrast, for example, the Danish qualifications framework of 2003 projects an imaginary of globalisation as a change towards a smaller and more predictable world, which enables a novel and more efficient alignment of the curriculum towards specific professional needs...

  11. Advanced qualification techniques

    International Nuclear Information System (INIS)

    Winokur, P.S.; Shaneyfelt, M.R.; Meisenheimer, T.L.; Fleetwood, D.M.

    1993-01-01

    This paper demonstrates use of the Qualified Manufacturers List (QML) methodology to qualify commercial and military microelectronics for use in space applications. QML ''builds in'' the hardness of product through statistical process control (SPC) of technology parameters relevant to the radiation response, test structure to integrated circuit (IC) correlations, and techniques for extrapolating laboratory test results to low-dose-rate space scenarios. Each of these elements is demonstrated and shown to be a cost-effective alternative to expensive end-of-line IC testing. Several examples of test structured-IC correlations are provided and recent work on complications arising from transistor scaling and geometry is discussed. The use of a 10-keV x-ray wafer-level test system to support SPC and establish ''process capability'' is illustrated and a comparison of 10-keV x-ray and Co 60 gamma irradiations is provided for a wide range of CMOS technologies. The x-ray tester is shown to be cost-effective and its use in lot acceptance/qualification is recommended. Finally, a comparison is provided between MIL-STD-883D, Test Method 1019.4, which governs the testing of packaged semiconductor microcircuits in the DoD, and ESA/SSC Basic Specification No. 22900, Europe's Total Dose Steady-State Irradiation Test Method. Test Method 1019.4 focuses on conservative estimates of MOS hardness for space and tactical applications, while Basic Specification 22900 focuses on improved simulation of low-dose-rate space environments

  12. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Qualifications of fixed-satellite space station licensees. 25.140 Section 25.140 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications...

  13. SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 5 QUALIFICATION

    Energy Technology Data Exchange (ETDEWEB)

    Pareizs, J; Cj Bannochie, C; Damon Click, D; Dan Lambert, D; Michael Stone, M; Bradley Pickenheim, B; Amanda Billings, A; Ned Bibler, N

    2008-11-10

    Sludge Batch 5 (SB5) is predominantly a combination of H-modified (HM) sludge from Tank 11 that underwent aluminum dissolution in late 2007 to reduce the total mass of sludge solids and aluminum being fed to the Defense Waste Processing Facility (DWPF) and Purex sludge transferred from Tank 7. Following aluminum dissolution, the addition of Tank 7 sludge and excess Pu to Tank 51, Liquid Waste Operations (LWO) provided the Savannah River National Laboratory (SRNL) a 3-L sample of Tank 51 sludge for SB5 qualification. SB5 qualification included washing the sample per LWO plans/projections (including the addition of a Pu/Be stream from H Canyon), DWPF Chemical Process Cell (CPC) simulations, waste glass fabrication (vitrification), and waste glass chemical durability evaluation. This report documents: (1) The washing (addition of water to dilute the sludge supernatant) and concentration (decanting of supernatant) of the Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF CPC simulation using the washed Tank 51 sample. This includes a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid is added to the sludge to destroy nitrite and remove mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit is added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters for the CPC processing were based on work with a non radioactive simulant. (3) Vitrification of a portion of the SME product and Product Consistency Test (PCT) evaluation of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This work is controlled by a Task Technical and Quality Assurance Plan (TTQAP) , and analyses are guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R

  14. Students' qualification in environmental and sustainability education—epistemic gaps or composites of critical thinking?

    Science.gov (United States)

    Hasslöf, Helen; Lundegård, Iann; Malmberg, Claes

    2016-01-01

    In an 'age of measurement' where students' qualification is a hot topic on the political agenda, it is of interest to ask what the function of qualification might implicate in relation to a complex issue as Education for Sustainable Development (ESD) and what function environmental and sustainability issues serve in science education. This paper deals with how secondary and upper secondary teachers in discussions with colleagues articulate qualification in relation to educational aims of ESD. With inspiration from discourse theory, the teachers' articulations of qualification are analysed and put in relation to other functions of education (qualification, socialisation and subjectification). The results of this study show three discourses of qualification: scientific reasoning, awareness of complexity and to be critical. The discourse of 'qualification as to be critical' is articulated as a composite of differing epistemological views. In this discourse, the teachers undulate between rationalistic epistemological views and postmodern views, in a pragmatic way, to articulate a discourse of critical thinking which serves as a reflecting tool to bring about different ways of valuing issues of sustainability, which reformulates 'matter of facts' towards 'matter of concerns'

  15. Challenges of equipment qualification using today's standards with emphasis on a class 1E motor program

    International Nuclear Information System (INIS)

    Deaton, K.

    1995-01-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed

  16. Personnel Officers: Judging Their Qualifications.

    Science.gov (United States)

    Webb, Gisela

    1988-01-01

    Discusses the backgrounds and qualifications appropriate for a library personnel administrator, including (1) a master's degree in library science; (2) library work experience; (3) additional training in administration, personnel management, organizational development, and psychology; and (4) personal attributes such as good communication skills,…

  17. Mutual Recogniton of Professional Qualifications

    DEFF Research Database (Denmark)

    Enemark, Stig; Plimmer, Francis

    The publication aims to review the concept of mutual recognition of qualifications within the world wide surveying community, and to develop a framework for the introduction of standards of global professional competence in this area. The publication also includes a number of case studies from...

  18. Qualification test on class 1E charger and inverter in nuclear power plant

    International Nuclear Information System (INIS)

    Li Mingcheng; Lin Jian; Fu Mingxing; Xu Benfu; Ma Peifeng

    2014-01-01

    The qualification approach for class lE electrical equipment was introduced, based on IEC, IEEE and RCC-E standards and technical documents. Combined with a lot of practical experience, the qualification scheme for class lE charger and inverter was developed. The component evaluation, performance and stress test, EMC test, seismic test and software qualification for the equipment were analyzed in detail. (authors)

  19. Fatigue qualification of high thickness composite rotor components

    Science.gov (United States)

    Raggi, M.; Mariani, U.; Zaffaroni, G.

    Fatigue qualification aspects of composite rotor components are presented according with the safe life procedure usually applied by helicopter manufacturers. Test activities are identified at three levels of specimen complexity: coupon, structural element and full scale component. Particular attention is given to high thickness laminates qualification as far as environmental exposure is concerned. A practical approach for an accelerated conditioning procedure is described. The application to a main rotor tension link is presented showing the negligible effect of the moisture absorption on its fatigue strength.

  20. Earthquake experience and seismic qualification by indirect methods in nuclear installations

    International Nuclear Information System (INIS)

    2003-01-01

    In recent years, many operational nuclear power plants around the world have conducted seismic re-evaluation programmes either as part of a review of seismic hazards or to comply with best international nuclear safety practices. In this connection, Member States have called on the IAEA to carry out several seismic review missions at their plants, primarily those of WWER and RBMK design. One of the critical safety issues that arose during these missions was that of seismic qualification (determination of fitness for service) of already installed plant distribution systems, equipment and components. The qualification of new components, equipment and distribution systems cannot be replicated for equipment that is already installed and operational in plants, as this process is neither feasible nor appropriate. For this reason, seismic safety experts have developed new procedures for the qualification of installed equipment: these procedures seek to demonstrate that installed equipment, through a process of comparison with new equipment, is apt for service. However, these procedures require large sets of criteria and qualification databases and call for the use of engineering judgement and experience, all of which open the door to wide margins of interpretation. In order to guarantee a sound technical basis for the qualification of in-plant equipment, currently applied to 70% to 80% of all plant equipment, the regulatory review of this type of qualification process calls for a detailed assessment of the technical procedures applied. Such an assessment is the first step towards eliminating the risk of large differences in qualification results between different plants, operators and countries, and guaranteeing the reliability of seismic re-evaluation programmes. Bearing this in mind, in 1999, the IAEA convened a seminar and technical meeting on seismic qualification under the auspices of the IAEA Technical Co-operation programme. Altogether 66 senior experts attended the

  1. The Changing Distribution of Teacher Qualifications Across Schools: A Statewide Perspective Post-NCLB

    Directory of Open Access Journals (Sweden)

    Karen J. DeAngelis

    2010-11-01

    Full Text Available A number of recent policy initiatives, including NCLB's highly qualified teacher provisions, have sought to improve the qualifications of teachers and their distribution across schools. Little is known, however, about the impact of these policies. In this study, we use population data on teachers and schools in Illinois to examine changes in the level and distribution of teacher qualifications from 2001 to 2006. We find that schools in Chicago, especially those serving the highest percentages of low-income and minority students, experienced the greatest improvements in teacher qualifications during the period. In addition, high-poverty schools in most other locales in the state registered small to moderate improvements, which narrowed the gap in teacher qualifications between high- and low-poverty schools across Illinois. Improvements in the certification status of experienced teachers and the recruitment of new teachers with stronger academic qualifications both contributed to these gains. The results reveal a tradeoff for disadvantaged schools seeking to improve both teacher qualifications and teacher experience levels, thereby calling into question the near-term feasibility of NCLB provisions that aim to simultaneously eliminate inequities across schools in both.       

  2. 7 CFR 4290.360 - Initial review of Applicant's management team's qualifications.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Initial review of Applicant's management team's...'s management team's qualifications. The Secretary will review the information submitted by the Applicant concerning the qualifications of the Applicant's management team to determine in his or her sole...

  3. Qualification and certification in NDT

    International Nuclear Information System (INIS)

    Hassan Kavarodi Maracair

    2003-01-01

    Ruane-TATI Sdn Bhd was the first accredited training centre in Asia approved by The British Institute of Non Destructive Testing (BINDT) as per EN 473, ISO 9712 and EN 45013 requirements. Meanwhile, Ruane-TATI is also accredited by National Vocational Training Center ( MLVK ).This mean that Ruane-TATI is the first training and examination center that accredited by both international and national bodies in providing quality , qualification and certification for comprehensive training and examination in Inspection and Non Destructive Testing (NDT). There are several NDT examinations scheme available in Malaysia due to differences requirement from the industrials. This has put the difficulties to services company in upgrading their NDT technician qualifications. The intention of this paper is to discuss the basic different among the NDT examinations scheme used in Malaysia ( mostly offered by Ruane-TATI ) and the development of certain schemes in covering their schemes to more sectors and NDT methods. (Author)

  4. Novel qualification methodology for subsea processing

    Energy Technology Data Exchange (ETDEWEB)

    Nilsen, Paal Jahre; Bratfos, Hans A. [Det Norske Veritas, Oslo (Norway)

    2004-07-01

    The purpose of the Reliability Analysis is to quantify the overall reliability of the technology to confirm that the functional requirements and the target reliability laid down in the Qualification Basis are met. On this basis DNV may issue a Statement of Fitness for Service affirming that the technology is considered qualified. Although a technology may be convincingly proven fit for service without using reliability measures, a quantified reliability makes the technology more competitive in a business where profitability is directly related to the reliability of the technology. In this respect it should also be noted that a reliability analysis require specific input data that sometimes must be derived by testing. It is therefore important to take this into consideration already in the selection and planning of qualification methods. (author)

  5. Data Qualification guidelines

    International Nuclear Information System (INIS)

    Edwards, T.B.; Shine, E.P.

    1992-01-01

    Data Qualification (DQ) is a formal, technical process whose objective is to affirm that experimental data are suitable for their intended use. Although it is not possible to develop a fixed recipe for the DQ process to cover all test situations, these general guidelines have been developed for the Nuclear Engineering Section to establish a framework for qualifying data from steady-state processing. These guidelines outline the role of the DQ team providing insight into the planning and conducting of the DQ process

  6. Nuclear power reactor security personnel training and qualification plan reviewer workbook

    International Nuclear Information System (INIS)

    1979-06-01

    The Training and Qualification Plan Reviewer Workbook has been developed to provide the information required for evaluating the adequacy of the Training and Qualification (T and Q) Plans developed to meet the requirements of 10 CFR 73.55(b)(4) and 10 CFR 73, Appendix B

  7. Recent developments in methodology for dynamic qualification of nuclear plant equipment

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1984-01-01

    Dynamic qualification of nuclear plant electrical and mechanical equipment is performed basically under guidelines given in IEEE Standards 323 and 344, and a variety of NRC regulatory guides. Over the last fifteen years qualification methodology prescribed by these documents has changed significantly as interpretations, equipment capability, and imagination of the qualification engineers have progressed. This progress has been sparked by concurrent NRC and industry sponsored research programs that have identified anomalies and developed new methodologies for resolving them. Revisions of the standards have only resulted after a lengthy debate of all such new information and subsequent judgment of its validity. The purpose of this paper is to review a variety of procedural improvements and developments in qualification methodology that are under current consideration as revisions to the standards. Many of the improvements and developments have resulted from recent research programs. All are very likely to appear in one type of standard or another in the near future

  8. Seismic and dynamic qualification methods

    International Nuclear Information System (INIS)

    Lin, C.W.

    1985-01-01

    This book presents the papers given at a conference on seismic effects on nuclear power plants. Topics considered at the conference included seismic qualification of equipment, multifrequency test methodologies, damping in piping systems, the amplification factor, thermal insulation, welded joints, and response factors for seismic risk analysis of piping

  9. Nuclear power plants. Electrical equipment of the safety system. Qualification

    International Nuclear Information System (INIS)

    2001-01-01

    This International Standard applies to electrical parts of safety systems employed at nuclear power plants, including components and equipment of any interface whose failure could affect unfavourably properties of the safety system. The standard also applies to non-electrical safety-related interfaces. Furthermore, the standard describes the generic process of qualification certification procedures and methods of qualification testing and related documentation. (P.A.)

  10. 46 CFR 68.7 - Qualification as an 883-1 corporation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Qualification as an 883-1 corporation. 68.7 Section 68.7... Trade § 68.7 Qualification as an 883-1 corporation. (a) To be formally qualified as an 883-1 corporation for all purposes under the Act, a corporation which meets the requirements of § 68.5 must file with...

  11. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Oliver [European Commission, Joint Research Centre (JRC), Petten (Netherlands). Institute for Energy and Transport (IET); Martin, Etienne [EDF, St Denis (France). Direction Production Ingenierie; Booler, Russ [AMEC Clean Energy Europe, Warrington (United Kingdom); Zetterwall, Tommy [Swedish Qualification Centre, Taeby (Sweden); Walker, Tony [Rolls-Royce Submarines, Derby (United Kingdom)

    2014-10-15

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8{sup th} technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  12. Current activities and challenges of the European network for inspection and qualification (ENIQ)

    International Nuclear Information System (INIS)

    Martin, Oliver; Martin, Etienne; Zetterwall, Tommy; Walker, Tony

    2014-01-01

    This article describes the development of the European Network for Inspection and Qualification (ENIQ) since the previous presentation of the network in the 2011 April/May edition of this journal, covering mainly the new technical challenges facing the network and resulting projects as well as the establishment of the new Task Group for Inspection Qualification Bodies. ENIQ is a utility-driven network dealing with the reliability and effectiveness of non-destructive testing (NDT) for nuclear power plants (NPP). ENIQ is recognised as one of the main contributors to today's global qualification codes and guidelines for in-service inspection (ISI) and has published nearly 50 documents. Among them are the 'European Methodology for Qualification of Non-Destructive Testing', the first qualification methodology based on technical justifications, the 'European Framework Document for Risk-Informed In-Service Inspection (RI-ISI)', and various recommend practices. In addition ENIQ has carried out two pilot studies and a number of surveys. In 2012, ENIQ joined the European based R and D association on Gen II and III reactors, NUGENIA, making ENIQ its 8 th technical area. Following the entry into NUGENIA, ENIQ members have updated the ENIQ roadmap and included a number of new technical challenges facing its members in the near future. Also ENIQ established a third task group in 2013, the Task Group for Inspection Qualification Bodies (TGIQB), which should serve as an exchange forum for inspection qualification bodies. ENIQ is currently preparing or performing new projects and studies to tackle these challenges and new recommended practices and reports are likely to evolve from these projects, which will enable ENIQ to maintain its role as one of the main contributors to today's global qualification codes and guidelines for ISI.

  13. Software qualification in safety applications

    International Nuclear Information System (INIS)

    Lawrence, J.D.

    2000-01-01

    The developers of safety-critical instrumentation and control systems must qualify the design of the components used, including the software in the embedded computer systems, in order to ensure that the component can be trusted to perform its safety function under the full range of operating conditions. There are well known ways to qualify analog systems using the facts that: (1) they are built from standard modules with known properties; (2) design documents are available and described in a well understood language; (3) the performance of the component is constrained by physics; and (4) physics models exist to predict the performance. These properties are not generally available for qualifying software, and one must fall back on extensive testing and qualification of the design process. Neither of these is completely satisfactory. The research reported here is exploring an alternative approach that is intended to permit qualification for an important subset of instrumentation software. The research goal is to determine if a combination of static analysis and limited testing can be used to qualify a class of simple, but practical, computer-based instrumentation components for safety application. These components are of roughly the complexity of a motion detector alarm controller. This goal is accomplished by identifying design constraints that enable meaningful analysis and testing. Once such design constraints are identified, digital systems can be designed to allow for analysis and testing, or existing systems may be tested for conformance to the design constraints as a first step in a qualification process. This will considerably reduce the cost and monetary risk involved in qualifying commercial components for safety-critical service

  14. Progress and challenges in the development and qualification of multi-level multi-physics coupled methodologies for reactor analysis

    International Nuclear Information System (INIS)

    Ivanov, K.; Avramova, M.

    2007-01-01

    Current trends in nuclear power generation and regulation as well as the design of next generation reactor concepts along with the continuing computer technology progress stimulate the development, qualification and application of multi-physics multi-scale coupled code systems. The efforts have been focused on extending the analysis capabilities by coupling models, which simulate different phenomena or system components, as well as on refining the scale and level of detail of the coupling. This paper reviews the progress made in this area and outlines the remaining challenges. The discussion is illustrated with examples based on neutronics/thermohydraulics coupling in the reactor core modeling. In both fields recent advances and developments are towards more physics-based high-fidelity simulations, which require implementation of improved and flexible coupling methodologies. First, the progresses in coupling of different physics codes along with the advances in multi-level techniques for coupled code simulations are discussed. Second, the issues related to the consistent qualification of coupled multi-physics and multi-scale code systems for design and safety evaluation are presented. The increased importance of uncertainty and sensitivity analysis are discussed along with approaches to propagate the uncertainty quantification between the codes. The incoming OECD LWR Uncertainty Analysis in Modeling (UAM) benchmark is the first international activity to address this issue and it is described in the paper. Finally, the remaining challenges with multi-physics coupling are outlined. (authors)

  15. Progress and challenges in the development and qualification of multi-level multi-physics coupled methodologies for reactor analysis

    Energy Technology Data Exchange (ETDEWEB)

    Ivanov, K.; Avramova, M. [Pennsylvania State Univ., University Park, PA (United States)

    2007-07-01

    Current trends in nuclear power generation and regulation as well as the design of next generation reactor concepts along with the continuing computer technology progress stimulate the development, qualification and application of multi-physics multi-scale coupled code systems. The efforts have been focused on extending the analysis capabilities by coupling models, which simulate different phenomena or system components, as well as on refining the scale and level of detail of the coupling. This paper reviews the progress made in this area and outlines the remaining challenges. The discussion is illustrated with examples based on neutronics/thermohydraulics coupling in the reactor core modeling. In both fields recent advances and developments are towards more physics-based high-fidelity simulations, which require implementation of improved and flexible coupling methodologies. First, the progresses in coupling of different physics codes along with the advances in multi-level techniques for coupled code simulations are discussed. Second, the issues related to the consistent qualification of coupled multi-physics and multi-scale code systems for design and safety evaluation are presented. The increased importance of uncertainty and sensitivity analysis are discussed along with approaches to propagate the uncertainty quantification between the codes. The incoming OECD LWR Uncertainty Analysis in Modeling (UAM) benchmark is the first international activity to address this issue and it is described in the paper. Finally, the remaining challenges with multi-physics coupling are outlined. (authors)

  16. High Temperature Materials Interim Data Qualification Report

    International Nuclear Information System (INIS)

    Lybeck, Nancy

    2010-01-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: (1) Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing - 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. (2) Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram - 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  17. Qualification of nuclear power plant operations personnel

    International Nuclear Information System (INIS)

    1984-01-01

    With the ultimate aim of reducing the possibility of human error in nuclear power plant operations, the Guidebook discusses the organizational aspects, the staffing requirements, the educational systems and qualifications, the competence requirements, the ways to establish, preserve and verify competence, the specific aspects of personnel management and training for nuclear power plant operations, and finally the particular situations and difficulties to be overcome by utilities starting their first nuclear power plant. An important aspect presented in the Guidebook is the experience in training and qualification of nuclear power plant personnel in various countries: Argentina, Belgium, Canada, Czechoslovakia, France, Federal Republic of Germany, Spain, Sweden, United Kingdom and United States of America

  18. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  19. The qualification of electrical components and instrumentations relevant to safety

    International Nuclear Information System (INIS)

    Zambardi, F.

    1989-03-01

    Systems and components relevant to safety of nuclear power plants must maintain their functional integrity in order to assure accident prevention and mitigation. Redundancy is utilized against random failures, nevertheless care must be taken to avoid common failures in redundant components. Main sources of degradation and common cause failures consist in the aging effects and in the changes of environmental conditions which occur during the plant life and the postulated accidents. These causes of degradation are expected to be especially significant for instrumentation and electrical equipment, which can have a primary role in safety systems. The qualification is the methodology by which component safety requirements can be met against the above mentioned causes of degradation. In this report the connection between the possible, plant conditions and the resulting degradation effects on components is preliminarily addressed. A general characterization of the qualification is then presented. Basis, methods and peculiar aspects are discussed and the qualification by testing is taken into special account. Technical and organizational aspects related to a plant qualification program are also focused. The report ends with a look to the most significant research and development activities. (author)

  20. Biomarkers as drug development tools: discovery, validation, qualification and use.

    Science.gov (United States)

    Kraus, Virginia B

    2018-06-01

    The 21st Century Cures Act, approved in the USA in December 2016, has encouraged the establishment of the national Precision Medicine Initiative and the augmentation of efforts to address disease prevention, diagnosis and treatment on the basis of a molecular understanding of disease. The Act adopts into law the formal process, developed by the FDA, of qualification of drug development tools, including biomarkers and clinical outcome assessments, to increase the efficiency of clinical trials and encourage an era of molecular medicine. The FDA and European Medicines Agency (EMA) have developed similar processes for the qualification of biomarkers intended for use as companion diagnostics or for development and regulatory approval of a drug or therapeutic. Biomarkers that are used exclusively for the diagnosis, monitoring or stratification of patients in clinical trials are not subject to regulatory approval, although their qualification can facilitate the conduct of a trial. In this Review, the salient features of biomarker discovery, analytical validation, clinical qualification and utilization are described in order to provide an understanding of the process of biomarker development and, through this understanding, convey an appreciation of their potential advantages and limitations.

  1. Challenges of equipment qualification using today`s standards with emphasis on a class 1E motor program

    Energy Technology Data Exchange (ETDEWEB)

    Deaton, K.

    1995-02-01

    This paper describes qualification of new equipment for safety related service in the nuclear power industry in accordance with current industry standards. This topic is presented from the perspective of an original equipment manufacturer J(OEM). Equipment qualification is first discussed in a general way then an example is provided of an electric motor qualification. A review of alternative qualification methods including commercial dedication is included. Potential difficulties with alternative/expedited qualification methods are also discussed.

  2. SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 7A QUALIFICATION

    Energy Technology Data Exchange (ETDEWEB)

    Pareizs, J.; Billings, A.; Click, D.

    2011-07-08

    Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non

  3. Qualification of ARROTTA code for LWR accident analysis

    International Nuclear Information System (INIS)

    Huang, P.-H.; Peng, K.Y.; Lin, W.-C.; Wu, J.-Y.

    2004-01-01

    This paper presents the qualification efforts performed by TPC and INER for the 3-D spatial kinetics code ARROTTA for LWR core transient analysis. TPC and INER started a joint 5 year project in 1989 to establish independent capabilities to perform reload design and transient analysis utilizing state-of-the-art computer programs. As part of the effort, the ARROTTA code was chosen to perform multi-dimensional kinetics calculations such as rod ejection for PWR and rod drop for BWR. To qualify ARROTTA for analysis of FSAR licensing basis core transients, ARROTTA has been benchmarked for the static core analysis against plant measured data and SIMULATE-3 predictions, and for the kinetic analysis against available benchmark problems. The static calculations compared include critical boron concentration, core power distribution, and control rod worth. The results indicated that ARROTTA predictions match very well with plant measured data and SIMULATE-3 predictions. The kinetic benchmark problems validated include NEACRP rod ejection problem, 3-D LMW LWR rod withdrawal/insertion problem, and 3-D LRA BWR transient benchmark problem. The results indicate that ARROTTA's accuracy and stability are excellent as compared to other space-time kinetics codes. It is therefore concluded that ARROTTA provides accurate predictions for multi-dimensional core transient for LWRs. (author)

  4. Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

    Science.gov (United States)

    Ramesham, Rajeshuni; Amaro, Luis R.; Brown, Paula R.; Usiskin, Robert; Prater, Jack L.

    2013-01-01

    A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

  5. Leaving school without qualifications and mental health problems to age 30.

    Science.gov (United States)

    Fergusson, David M; McLeod, Geraldine F H; Horwood, L John

    2015-03-01

    To examine the associations between leaving school without qualifications and subsequent mental health to age 30, using data gathered over the course of a 30-year longitudinal study. Data were gathered over the course of a 30-year study (Christchurch Health and Development Study) of a birth cohort of 1265 children, born in Christchurch in 1977. This cohort has been studied on 22 occasions from birth to age 30. As part of this study, information was gathered on: (a) school leaving qualifications, (b) mental health problems from 18 to 30; and (c) prospectively assessed childhood and adolescent factors including: child and family background; family violence and child abuse; and adolescent mental health problems. Leaving school without qualifications was associated with increased risks of subsequent: major depression (OR = 1.37 at 95 % CI 1.05-1.78, p = 0.019); anxiety disorder (OR = 1.99 at 95 % CI 1.55-2.57, p mental health problems) reduced these associations substantially and to the point of statistical non-significance. The findings of this study suggest that there was no direct causal association between leaving school without qualifications and subsequent mental health problems. Associations were explained by the linkages between leaving school without qualifications and: child and family social background; and mental health around the point of school leaving.

  6. Forced Attention to Specific Applicant Qualifications: Impact on Physical Attractiveness and Sex of Applicant Biases.

    Science.gov (United States)

    Cann, Arnie; And Others

    1981-01-01

    Undergraduates evaluated the qualifications of an attractive, average, or unattractive male or female applicant. Ratings of specific qualifications preceded or followed an overall and hiring decision rating. The order variable influenced ratings of specific qualifications but not the overall or hiring decision. Male and attractive applicants were…

  7. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  8. Qualification Procedures of the CMS Pixel Barrel Modules

    CERN Document Server

    Starodumov, A; Horisberger, R.; Kastli, H.Chr.; Kotlinski, D.; Langenegger, U.; Meier, B.; Rohe, T.; Trueb, P.

    2006-01-01

    The CMS pixel barrel system will consist of three layers built of about 800 modules. One module contains 66560 readout channels and the full pixel barrel system about 48 million channels. It is mandatory to test each channel for functionality, noise level, trimming mechanism, and bump bonding quality. Different methods to determine the bump bonding yield with electrical measurements have been developed. Measurements of several operational parameters are also included in the qualification procedure. Among them are pixel noise, gains and pedestals. Test and qualification procedures of the pixel barrel modules are described and some results are presented.

  9. Improving reticle defect disposition via fully automated lithography simulation

    Science.gov (United States)

    Mann, Raunak; Goodman, Eliot; Lao, Keith; Ha, Steven; Vacca, Anthony; Fiekowsky, Peter; Fiekowsky, Dan

    2016-03-01

    Most advanced wafer fabs have embraced complex pattern decoration, which creates numerous challenges during in-fab reticle qualification. These optical proximity correction (OPC) techniques create assist features that tend to be very close in size and shape to the main patterns as seen in Figure 1. A small defect on an assist feature will most likely have little or no impact on the fidelity of the wafer image, whereas the same defect on a main feature could significantly decrease device functionality. In order to properly disposition these defects, reticle inspection technicians need an efficient method that automatically separates main from assist features and predicts the resulting defect impact on the wafer image. Analysis System (ADAS) defect simulation system[1]. Up until now, using ADAS simulation was limited to engineers due to the complexity of the settings that need to be manually entered in order to create an accurate result. A single error in entering one of these values can cause erroneous results, therefore full automation is necessary. In this study, we propose a new method where all needed simulation parameters are automatically loaded into ADAS. This is accomplished in two parts. First we have created a scanner parameter database that is automatically identified from mask product and level names. Second, we automatically determine the appropriate simulation printability threshold by using a new reference image (provided by the inspection tool) that contains a known measured value of the reticle critical dimension (CD). This new method automatically loads the correct scanner conditions, sets the appropriate simulation threshold, and automatically measures the percentage of CD change caused by the defect. This streamlines qualification and reduces the number of reticles being put on hold, waiting for engineer review. We also present data showing the consistency and reliability of the new method, along with the impact on the efficiency of in

  10. Qualification and testing of CT systems

    DEFF Research Database (Denmark)

    Bartscher, Markus; Neuschaefer-Rube, Ulrich; Illemann, Jens

    2018-01-01

    This chapter focuses on system verification and conformance to specifications. System qualification is carried out to ensure that the system and itscomponents achieve the best performance—usually corresponding to the specificationsmade by the manufacturer. Acceptance and reverification testing ar...

  11. NRC Information No. 89-23: Environmental qualification of Litton-Veam CIR series electrical connectors

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    Litton-Veam CIR series multi-pin electrical connectors are used in core exit thermocouple (CET) and reactor vessel level monitoring (RVLM) systems supplied to numerous plants by Combustion Engineering, Inc., and are used in other applications in at least three additional plants. A proprietary qualification test report has been used to document environmental qualification of the connectors for loss of coolant accident (LOCA) conditions in the CE-supplied systems. During LOCA testing, the connector face seal gasket was completely degraded and elastomeric inserts interacted with simulated containment spray solution which leaked into the connector. Insulation resistances near 1,000 ohms were measured. CE has performed analyses to show that resultant errors are acceptable in CE-supplied CET and RVLM system thermocouple circuits. However, the moisture ingress and resultant low insulation resistances are not acceptable for heater circuits in the RVLM. For that application, CE developed two remedies; one is a clamp, and the other is a new connector design. CE has advised that one of these remedies has been used for all of the RVLM heater circuits. Unmodified CIR connectors are believed to be still in use in other applications

  12. 15 CFR 40.2 - Qualifications.

    Science.gov (United States)

    2010-01-01

    ... Qualifications. (a) To be eligible for a training grant at the Bureau of the Census the applicant must be: (1) A... training programs. (2) Able to speak, read, write, and understand the English language. (3) Sponsored by his government either directly with the United States or through a public international agency. (4...

  13. Evaluation and qualification of novel control techniques with safety requirements

    International Nuclear Information System (INIS)

    Gossner, S.; Wach, D.

    1985-01-01

    The paper discusses the questions related to the assessment and qualification of new I and C-systems. The tasks of nuclear power plant I and Cs as well as the efficiency of the new techniques are reflected. Problems with application of new I and Cs and the state of application in Germany and abroad are addressed. Starting from the essential differencies between conventional and new I and C-systems it is evaluated, if and in which way existing safety requirements can be met and to what extent new requirements need to be formulated. An overall concept has to be developed comprising the definition of graded requirement profiles for design and qualification. Associated qualification procedures and tools have to be adapted, developed and tuned upon each other. (orig./HP) [de

  14. Qualification of conditioning process

    International Nuclear Information System (INIS)

    Wolf, J.

    1989-01-01

    A conditioning process is qualified by the PTB if the execution of pre-treatment and conditioning occurs so that a safe and orderly final storage of the products and waste containers produced can be assumed. All the relevant operating conditions for the plant are laid down by the producer/conditioner of the waste in a handbook. The elements of product inspection by process qualification are shown in tabular form. (DG) [de

  15. NASA/FAA helicopter simulator workshop

    Science.gov (United States)

    Larsen, William E. (Editor); Randle, Robert J., Jr. (Editor); Bray, Richard S. (Editor); Zuk, John (Editor)

    1992-01-01

    A workshop was convened by the FAA and NASA for the purpose of providing a forum at which leading designers, manufacturers, and users of helicopter simulators could initiate and participate in a development process that would facilitate the formulation of qualification standards by the regulatory agency. Formal papers were presented, special topics were discussed in breakout sessions, and a draft FAA advisory circular defining specifications for helicopter simulators was presented and discussed. A working group of volunteers was formed to work with the National Simulator Program Office to develop a final version of the circular. The workshop attracted 90 individuals from a constituency of simulator manufacturers, training organizations, the military, civil regulators, research scientists, and five foreign countries.

  16. Visas and qualifications: Syrian refugees in Brazil

    Directory of Open Access Journals (Sweden)

    Gilberto M A Rodrigues

    2017-10-01

    Full Text Available Brazil’s humanitarian visa programme for Syrian refugees and its efforts to recognise their qualifications could offer lessons for refugee protection and integration across the region.

  17. Technical basis for environmental qualification of computer-based safety systems in nuclear power plants

    International Nuclear Information System (INIS)

    Korsah, K.; Wood, R.T.; Tanaka, T.J.; Antonescu, C.E.

    1997-01-01

    This paper summarizes the results of research sponsored by the US Nuclear Regulatory Commission (NRC) to provide the technical basis for environmental qualification of computer-based safety equipment in nuclear power plants. This research was conducted by the Oak Ridge National Laboratory (ORNL) and Sandia National Laboratories (SNL). ORNL investigated potential failure modes and vulnerabilities of microprocessor-based technologies to environmental stressors, including electromagnetic/radio-frequency interference, temperature, humidity, and smoke exposure. An experimental digital safety channel (EDSC) was constructed for the tests. SNL performed smoke exposure tests on digital components and circuit boards to determine failure mechanisms and the effect of different packaging techniques on smoke susceptibility. These studies are expected to provide recommendations for environmental qualification of digital safety systems by addressing the following: (1) adequacy of the present preferred test methods for qualification of digital I and C systems; (2) preferred standards; (3) recommended stressors to be included in the qualification process during type testing; (4) resolution of need for accelerated aging in qualification testing for equipment that is to be located in mild environments; and (5) determination of an appropriate approach to address smoke in a qualification program

  18. Round table discussion " Development of qualification framework in meteorology (TEMPUS QUALIMET)"

    Science.gov (United States)

    Bashmakova, I.; Belotserkovsky, A.; Karlin, L.; Petrosyan, A.; Serditova, N.; Zilitinkevich, S.

    2010-09-01

    The international consortium has started implementing a project aimed at the development of unified framework of qualifications in meteorology (QualiMet), setting a system of recognition and award of qualifications up to Doctoral level based on standards of knowledge, skill and competence acquired by learners is underway. The QualiMet has the following specific objectives: 1. To develop standards of knowledge, skills and competence for all qualifications up to Doctoral level needed in all possible occupations meteorology learner can undertake, by July 2011 2. To develop reciprocally recognized rubrics, criteria, methods and tools for assessing the compliance with the developed standards (quality assurance), by July 2012 3. To set the network of Centers of Excellence as the primary designer of sample education programs and learning experiences, both in brick-and-mortar and distant setting of delivery, leading to achievement of the developed standards, by December 2012 4. To set a system of mutual international recognition and award of qualifications in meteorology based on the developed procedures and establishment of self-regulatory public organization, by December 2012 The main beneficiaries of the project are: 1. Meteorology learners from the consortium countries. They will be able to make informed decisions about available qualification choices and progression options and provided an opportunity for students and graduates to participate in the system of international continuous education. 2. Meteorology employers from the consortium countries, They will be able to specify the level of knowledge, skill and competence required for occupational roles, evaluate qualifications presented, connect training and development with business needs. 3. Students and academic staff of all the consortium members, who will gain the increased mobility and exchange the fluxes of culturally and institutionally diversified lecturers and qualified specialists

  19. Implementation and qualification of MCNP 5 through the intercomparison with the benchmark for the calculation of critical systems Godiva and Jezebel

    International Nuclear Information System (INIS)

    Lara, Rafael G.; Maiorino, Jose R.

    2013-01-01

    This work aimed at the implementation and qualification of MCNP code in a supercomputer of the Universidade Federal do ABC, so that may be available a next-generation simulation tool for precise calculations of nuclear reactors and systems subject to radiation. The implementation of this tool will have multidisciplinary applications, covering various areas of engineering (nuclear, aerospace, biomedical), radiation physics and others

  20. Twenty-five years of simulator training

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    The first training simulator for nuclear power plant personnel in Germany was commissioned twenty-five years ago. The strategy of training by simulators was developed and pursued consistently and continuously in order to ensure sound training of nuclear power plant personnel. The present thirteen simulators cover a broad range of plants. A systematic training concept also helps to ensure a high level of competence and permanent qualification of plant personnel. The anniversary was marked by a festive event at which Erich K. Steiner read a paper on 'The Importance of Simulator Training', and Professor Dr. Adolf Birkhofer spoke about 'Nuclear Technology Education and Training'. (orig.)

  1. PWR Secondary Water Chemistry Control Status: A Summary of Industry Initiatives, Experience and Trends Relative to the EPRI PWR Secondary Water Chemistry Guidelines

    International Nuclear Information System (INIS)

    Fruzzetti, Keith; Choi, Samuel

    2012-09-01

    The latest revision of the EPRI Pressurized Water Reactor (PWR) Secondary Water Chemistry Guidelines was issued in February 2009. The Guidelines continue to focus on minimizing stress corrosion cracking (SCC) of steam generator tubes, as well as minimizing degradation of other major components / subsystems of the secondary system. The Guidelines provide a technically-based framework for a plant-specific and effective PWR secondary water chemistry program. With the issuance of Revision 7 of the Guidelines in 2009, many plants have implemented changes that allow greater flexibility on startup. For example, the previous Guidelines (Revision 6) contained a possible low power hold at 5% power and a possible mid power hold at approximately 30% power based on chemistry constraints. Revision 7 has established a range over which a plant-specific value can be chosen for the possible low power hold (between 5% and 15%) and mid power hold (between 30% and 50%). This has provided plants the ability to establish significant plant evolutions prior to reaching the possible power hold; such as establishing seal steam to the condenser, placing feed pumps in service, or initiating forward flow of heater drains. The application of this flexibility in the industry will be explored. This paper also highlights the major initiatives and industry trends with respect to PWR secondary chemistry; and outlines the recent work to effectively address them. These will be presented in light of recent operating experience, as derived from EPRI's PWR Chemistry Monitoring and Assessment (CMA) program (which contains more than 400 cycles of operating chemistry data). (authors)

  2. Appointment, qualifications and responsibilities of ventilation officers

    International Nuclear Information System (INIS)

    1981-01-01

    The Code provides for the appointment of a ventilation officer when required by the appropriate authority. This guideline offers comment on the appointment, qualifications, training and responsibilities of that person

  3. Who Can Be President of the United States?: Candidate Hillary Clinton and the Problem of Statutory Qualifications

    Directory of Open Access Journals (Sweden)

    Tillman Seth Barrett

    2016-04-01

    Full Text Available Qualifications for public office restrict democratic choice, but such restrictions have a long pedigree in many jurisdictions. For example, the U.S. Constitution sets out qualifications for elected federal officials: i.e., Representative, Senator, President, and Vice President. Qualifications for those positions include provisions relating to age, citizenship, and residence. It has been long debated whether these textual qualifications are exclusive (i.e., floors and ceilings or whether they are merely floors, which can be supplemented by additional qualifications imposed by Congress or by the States.

  4. AZ-101 Mixer Pump Test Qualification Test Procedures (QTP)

    International Nuclear Information System (INIS)

    THOMAS, W.K.

    2000-01-01

    Describes the Qualification test procedure for the AZ-101 Mixer Pump Data Acquisition System (DAS). The purpose of this Qualification Test Procedure (QTP) is to confirm that the AZ-101 Mixer Pump System has been properly programmed and hardware configured correctly. This QTP will test the software setpoints for the alarms and also check the wiring configuration from the SIMcart to the HMI. An Acceptance Test Procedure (ATP), similar to this QTP will be performed to test field devices and connections from the field

  5. URGENT AND LAG PSYCHOPHYSIOLOGICAL EFFECTS NEUROFEEDBACK IN SPORTSMEN OF HIGH QUALIFICATION

    Directory of Open Access Journals (Sweden)

    O. V. Kaigorodtseva

    2013-01-01

    Full Text Available The article provides a comparative analysis of the psychophysiological state of sportsmen of high qualification within one year after the course neurofeedback. These data demonstrated that high qualification sportsmen physiological effects of training persist throughout the year and depend on the ability to arbitrarily increase the power of the alpha rhythm of the brain.

  6. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    Energy Technology Data Exchange (ETDEWEB)

    Chang, C.K., E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of); Lee, K.J., E-mail: klee@khu.ac.kr [Kyung Hee Univ., Seoul (Korea, Republic of)

    2014-07-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  7. NFC based Equipment Qualification Management (NEQM) system preventing counterfeit and fraudulent item

    International Nuclear Information System (INIS)

    Chang, C.K.; Lee, K.J.

    2014-01-01

    Qualification of equipment essential to safety in nuclear power plants (NPPs) ensures its capability to perform designated safety functions on demand under postulated service conditions. However, a number of incidents identified by the NRC since 1980s catalysed the US nuclear industry to adopt standard precautions to guard against counterfeit items. The purpose of this paper is to suggest the NFC (Near Field Communication) based equipment qualification management system preventing counterfeit and fraudulent items. The NEQM (NFC based Equipment Qualification Management) system work with the support of legacy systems such as PMS (Procurement Management System) and FMS (Facility management System). (author)

  8. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  9. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    International Nuclear Information System (INIS)

    Mitteau, Raphaël; Eaton, R.; Perez, G.; Zacchia, F.; Banetta, S.; Bellin, B.; Gervash, A.; Glazunov, D.; Chen, J.

    2015-01-01

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  10. Status of the beryllium tile bonding qualification activities for the manufacturing of the ITER first wall

    Energy Technology Data Exchange (ETDEWEB)

    Mitteau, Raphaël, E-mail: Raphael.mitteau@iter.org [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Eaton, R.; Perez, G. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Zacchia, F.; Banetta, S.; Bellin, B. [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Gervash, A.; Glazunov, D. [Efremov Research Institute, 189631 St. Petersburg (Russian Federation); Chen, J. [Southwestern Institute of Physics, Huangjing Road, Chengdu 610225 (China)

    2015-10-15

    The preparation of the manufacturing of the ITER first wall involves a qualification stage. The qualification aims at demonstrating that manufacturers can deliver the needed reliability and quality for the beryllium to copper bond, before the manufacturing can commence. The qualification is done on semi-prototype, containing relevant features relative to the beryllium armour (about 1/6 of the panel size). The qualification is done by the participating parties, firstly by a manufacturing semi-prototype and then by testing it under heat flux. One semi-prototype is manufactured and is being tested, and further from other manufacturers are still to come. The qualification programme is accompanied by bond defect investigations, which aim at defining defect acceptance criteria. Qualification and defect acceptance programme are supported by thermal and stress analyses, with good agreement regarding the thermal results, and some insights about the governing factors to bond damage.

  11. Aircraft impact qualification of RBMK systems and components. Technical report. Rev. 00, May 1999

    International Nuclear Information System (INIS)

    1999-01-01

    In the present report, the problem of qualification procedures of electrical equipment with respect to the dynamic excitation subsequent to an aircraft impact (ACC) on a Nuclear Power Plant (NPP) is approached, within the context of IAEA Benchmark on vulnerability of equipment and structures of RBMK-type NPP against the aircraft impact. After a short description of the main objectives of the work and the relevant area of concern (Chapter 1), the safety related equipment more commonly installed in a NPP are grouped in few classes, according to widely accepted classification criteria and the relevant failure modes are described (Chapter 2). Taking as reference a deeply studied RBMK reactor (Ignalina NPP), an overview of its main characteristics and of the equipment ensemble housed in is given in Chapter 3. An overview of the worldwide most used qualification standards for safety related equipment for NPPs is reported in Chapter 4, and a comparison of the practices used in Europe for the qualification of safety related electrical and I and C equipment is described with special attention to seismic and impact qualification (Chapter 5). In the hypothesis that the equipment to qualify against impact excitation has been already qualified against seismic excitation, the problems relevant to the different nature of earthquake and shock phenomena are listed, together with the main criteria to implement a procedure which, based on standardized shock pulses, could be applied for ACC qualification purposes (Chapter 6). Consequently, a possible ACC qualification procedure is outlined (Chapter 7) and the interface data (data coming from numerical analysis and seismic qualification, to be used for ACC qualification purposes) are listed (Chapter 8). Finally, the main conclusions of the work are described (Chapter 9). The main references are listed in Chapter 10. (author)

  12. Design requirements, criteria and methods for seismic qualification of CANDU power plants

    International Nuclear Information System (INIS)

    Singh, N.; Duff, C.G.

    1979-10-01

    This report describes the requirements and criteria for the seismic design and qualification of systems and equipment in CANDU nuclear power plants. Acceptable methods and techniques for seismic qualification of CANDU nuclear power plants to mitigate the effects or the consequences of earthquakes are also described. (auth)

  13. Qualification of organizations for independent technical supervision

    International Nuclear Information System (INIS)

    1981-04-01

    The requirements are established on trial for the qualification of an organization as an independent technical supervision organization in nuclear facilities, in activities related with quality assurance programs. (I.C.R.) [pt

  14. The HTR modular power reactor system. Qualification of fuel elements and materials

    International Nuclear Information System (INIS)

    Heidenreich, U.; Breitling, H.; Nieder, R.; Ohly, W.; Mittenkuehler, A.; Ragoss, H.; Seehafer, H.J.; Wirtz, K.; Serafin, N.

    1989-01-01

    For further development of the HTR modular power reactor system (HTR-M-KW), the project activities for 'Qualification of fuel elements and materials' reported here cover the work for specifying the qualifications to be met by metallic and ceramic materials, taking into account the design-based requirements and the engineered safety requirements. The fission product retention data determined for the HTR modular reactor fuel elements could be better confirmed by evaluation of the experiments, and have been verified by various calculation methods for different operating conditions. The qualification of components was verified by strength analyses including a benchmark calculation for specified normal operation and emergencies; the results show a convenient behaviour of the components and their materials. In addition, a fuel element burnup measuring system was designed that applies Cs-137 gamma spectroscopy; its feasibility was checked by appropriate analyses, and qualification work is in progress. The installation of a prototype measurement system is the task for project No. 03 IAT 211. (orig.) [de

  15. Modular Modeling System (MMS) code: a versatile power plant analysis package

    International Nuclear Information System (INIS)

    Divakaruni, S.M.; Wong, F.K.L.

    1987-01-01

    The basic version of the Modular Modeling System (MMS-01), a power plant systems analysis computer code jointly developed by the Nuclear Power and the Coal Combustion Systems Divisions of the Electric Power Research Institute (EPRI), has been released to the utility power industry in April 1983 at a code release workshop held in Charlotte, North Carolina. Since then, additional modules have been developed to analyze the Pressurized Water Reactors (PWRs) and the Boiling Water Reactors (BWRs) when the safety systems are activated. Also, a selected number of modules in the MMS-01 library have been modified to allow the code users more flexibility in constructing plant specific systems for analysis. These new PWR and BWR modules constitute the new MMS library, and it includes the modifications to the MMS-01 library. A year and half long extensive code qualification program of this new version of the MMS code at EPRI and the contractor sites, back by further code testing in an user group environment is culminating in the MMS-02 code release announcement seminar. At this seminar, the results of user group efforts and the code qualification program will be presented in a series of technical sessions. A total of forty-nine papers will be presented to describe the new code features and the code qualification efforts. For the sake of completion, an overview of the code is presented to include the history of the code development, description of the MMS code and its structure, utility engineers involvement in MMS-01 and MMS-02 validations, the enhancements made in the last 18 months to the code, and finally the perspective on the code future in the fossil and nuclear industry

  16. PR Faculty: What Are Their Qualifications?

    Science.gov (United States)

    Johnson, Thomas B.; Rabin, Kenneth

    1977-01-01

    Discusses a study designed to determine existing trends in the backgrounds and qualifications of public relations instructors and how these might affect public relations education. Available from: Public Relations Review, Ray Hiebert, Dean, College of Journalism, University of Maryland, College Park, MD 20742. (MH)

  17. Relationship Between Teachers\\' Qualification And Students ...

    African Journals Online (AJOL)

    It has been observed that students\\' performance in technical subjects is very poor. Coupled with this problem is that of lack of qualified technical teachers. This study determines the relationship between teachers\\' qualification and students\\' performance in technical subjects in selected schools in northern Nigeria.

  18. 42 CFR 485.705 - Personnel qualifications.

    Science.gov (United States)

    2010-10-01

    ... Physical Therapy and Speech-Language Pathology Services § 485.705 Personnel qualifications. (a) General... involved in the furnishing of outpatient physical therapy, occupational therapy, and speech-language...) of the Act and the requirements in part 484 of this chapter. (2) For a speech-language pathologist...

  19. A strategy for implementation of experience based seismic equipment qualification in IEEE and ASME industry standards

    International Nuclear Information System (INIS)

    Adams, T.M.

    1996-01-01

    In the past 20 years, extensive data on the performance of mechanical and electric equipment during actual strong motion earthquakes and seismic qualification tests has been accumulated. Recognizing that an experience based approach provides a technically sound and cost effective method for the seismic qualification of some or certain equipment, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment established a Special Working Group to investigate the incorporation of experienced based methods into the industry consensus codes and standards currently used in the seismic qualification of Seismic Category Nuclear Power Plant equipment. This paper presents the strategy (course of action) which was developed by the Special Working Group for meeting this objective of incorporation of experience based seismic qualification standards used in the design and seismic qualification of seismic category nuclear power plant equipment. This strategy was recommended to both chartering organizations, the IEEE Nuclear Power Engineering Committee and the ASME Committee on Qualification of Mechanical Equipment for their consideration and implementation. The status of the review and implementation of the Special Working Group's recommended strategy by the sponsoring organization is also discussed

  20. Professional Exam as a Tool for Forming the Trajectory of Improving the Qualification of an Employee

    Directory of Open Access Journals (Sweden)

    Egorov I.

    2017-11-01

    Full Text Available The results of the study of the provisions of the Federal Law "On Independent Qualification Assessment", of an explanatory note to the draft of the Federal Law "On Independent Qualification Assessment", of a number of other normative legal acts regarding the objectives and procedure for the implementation of an independent assessment of qualifications, including a professional exam, the use of its results, are described. On the basis of the analysis of a number of research works on the improvement of the qualifications of employees and the development of the system of continuous education, conclusions were drawn on an objective assessment by the legislator of a permanent increase in the requirements for the qualification of workers and the consequent need for continuous improvement of their qualifications, including the development of a continuous education system. Proposals have been formulated to introduce amendments to the legislation of the Russian Federation aimed at forming a recommendation for an employee to select existing resources for the self-alignment of an individual set of competences with a personalized offer of support options from the educational and professional structures - the trajectory of improving the qualification of an employee..

  1. "EU-on-Demand": Developing National Qualifications Frameworks in a Multi-Level Context

    Science.gov (United States)

    Elken, Mari

    2016-01-01

    The development of comprehensive national qualifications frameworks (NQFs) across Europe has been sparked by the introduction of the European Qualifications Framework (EQF) in 2008. Taking an institutional perspective, this article examines the development of NQFs in three countries, in light of developments that have taken place at the European…

  2. Standard High Solids Vessel Design De-inventory Simulant Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Fiskum, Sandra K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Burns, Carolyn A.M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Gauglitz, Phillip A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Linn, Diana T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Peterson, Reid A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Smoot, Margaret R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-09-12

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is working to develop a Standard High Solids Vessel Design (SHSVD) process vessel. To support testing of this new design, WTP engineering staff requested that a Newtonian simulant be developed that would represent the de-inventory (residual high-density tank solids cleanout) process. Its basis and target characteristics are defined in 24590-WTP-ES-ENG-16-021 and implemented through PNNL Test Plan TP-WTPSP-132 Rev. 1.0. This document describes the de-inventory Newtonian carrier fluid (DNCF) simulant composition that will satisfy the basis requirement to mimic the density (1.18 g/mL ± 0.1 g/mL) and viscosity (2.8 cP ± 0.5 cP) of 5 M NaOH at 25 °C.1 The simulant viscosity changes significantly with temperature. Therefore, various solution compositions may be required, dependent on the test stand process temperature range, to meet these requirements. Table ES.1 provides DNCF compositions at selected temperatures that will meet the density and viscosity specifications as well as the temperature range at which the solution will meet the acceptable viscosity tolerance.

  3. STEM Leadership Qualification: Tomorrow's Leaders Today

    Science.gov (United States)

    Williams, Chris

    2009-01-01

    This article features the Science, Technology, Engineering and Mathematics (STEM) Leadership Qualification programme, developed by the Centre for Science Education (CSE) at Sheffield Hallam University in collaboration with Edexcel, which sets out to develop leadership skills and capabilities through contexts in STEM. With six units to complete…

  4. 5 CFR 330.208 - Qualification requirements.

    Science.gov (United States)

    2010-01-01

    ... perform the duties and responsibilities of the position. (c) The sex of an individual may not be... qualified for a position if he or she: (1) Meets OPM-established or approved qualification standards and requirements for the position, including any minimum educational requirements, and any selection placement...

  5. Quality Assurance and Qualifications Frameworks: Exchanging Good Practice. ENQA Workshop Report 21

    Science.gov (United States)

    Blomqvist, Carita; Donohoe, Tony; Kelo, Maria; Linde, Karin Jarplid; Llavori, Rafael; Maguire, Bryan; Metz, David; Sanchez, Teresa

    2012-01-01

    The theme of qualifications frameworks and their relation to quality assurance is gaining urgency in the European scene as more and more countries are completing their national qualifications frameworks and quality assurance agencies need to take important decisions on how to implement them. Some of the key features of the qualifications…

  6. 10 CFR 50.120 - Training and qualification of nuclear power plant personnel.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Training and qualification of nuclear power plant... Training and qualification of nuclear power plant personnel. (a) Applicability. The requirements of this... each holder of a combined license issued under part 52 of this chapter for a nuclear power plant of the...

  7. Logic qualification of FPGA-based safety-related I and C systems

    International Nuclear Information System (INIS)

    Hayashi, Toshifumi; Oda, Naotaka; Ito, Toshiaki; Miyazaki, Tadashi; Haren, Yasuhiko

    2009-01-01

    We established a logic qualification method for FPGA-Based I and C safety-related use in Nuclear Power Plants Systems. The FPGA is a programmable logic device and has advantages that the programming is rigorous, simple verifiable, and the technology is stable. However, logic qualification of FPGA had been an issue to be solved when it is used in the safety-related systems, because FPGA is relatively new technology for the nuclear power industry. We employed a software-life cycle approach, because its development process is similar to that of conventional computer-based systems. There are some differences between the FPGA-Based systems and the computer-based systems in the implementation and integration of logic. We examined the FPGA logic implementation and integration process to identify any FPGA-Based system specific hazards. The identified hazards are (1) small logic errors, (2) timing errors, (3) logic synthesis errors, (4) place and route errors, and (5) logic embedding errors. We took the appropriate countermeasures to mitigate these hazards, and employed this logic qualification method in the qualification of the Power Range Monitor System for BWR Power Plants. (author)

  8. DATA QUALIFICATION REPORT: DATA QUALIFICATION REPORT FOR 1991 1:1200 TOPOGRAPHIC MAPS FOR USE ON THE YUCCA MOUNTAIN PROJECT

    International Nuclear Information System (INIS)

    Knop, M.F.; Grant, T.A.; Bonisolli, R.W.

    2005-01-01

    This Data Qualification Report (DQR) is prepared in accordance with the provisions of AP-SIII.2Q, Rev. 0, ICN 3, Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data and Data Qualification Plan for 1991 Topographic Maps 1:1200 Scale for use on the Yucca Mountain Project, DQP-WHS-CI-000001, Rev. 00 (BSC 2002a). This DQR presents an evaluation of a set of 90 topographic sheets at 1:1200 scale (and an associated electronic file) that covers an approximate 18 square mile area surrounding the proposed Yucca Mountain Project repository surface facilities location in Midway Valley, Nevada. These maps, that require qualification, are now being used to determine the physical characteristics of watershed sub-areas, interconnecting channels, and drainage channel cross-sections for hydrologic engineering studies of the north portal pad and vicinity. The result of this effort is to qualify one data tracking number (DTN) containing the electronic version of the mapping data. This DTN is: M09906COV98462.000. Coverage: TOP02FTS. The underlying quality assurance (QA) issue associated with these topographic maps is that the maps were originally designated as not for use in the design of items important to safety, waste isolation, and/or of programmatic importance. The maps were therefore generated outside the U.S. Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) QA program. Based on a comparison with corroborating information, this report concludes that the topographic maps are qualified. The comparison found that the mapping was reasonably accurate when compared with other mapping and survey data within the coverage area of the maps. Relative map accuracy was found to be very good and suitable for the hydrologic engineering studies being considered. Absolute accuracy is good but could not be demonstrated to comply with national map accuracy standards. Point locations that require high absolute accuracy should be

  9. 78 FR 25488 - Qualification Tests for Safety-Related Actuators in Nuclear Power Plants

    Science.gov (United States)

    2013-05-01

    ... Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for... regulatory guide (DG), DG-1235, ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants... entitled ``Qualification Tests for Safety-Related Actuators in Nuclear Power Plants'' is temporarily...

  10. A Motor Drive Electronics Assembly for Mars Curiosity Rover: An Example of Assembly Qualification for Extreme Environments

    Science.gov (United States)

    Kolawa, Elizabeth; Chen, Yuan; Mojarradi, Mohammad M.; Tudryn Weber, Carissa

    2013-01-01

    In this paper, the technology development and infusion of the motor drive electronics assembly, along with the technology qualification and space qualification, is described and detailed. The process is an example of the qualification methodology for extreme environmen

  11. QUALIFICATIONS FRAMEWORKS LEADING TO REFORMS IN EAST EUROPEAN EDUCATION

    Directory of Open Access Journals (Sweden)

    Arjen Vos

    2014-01-01

    Full Text Available The paper examines the evolution of qualifications frameworks across Europe. Five years ago, it was not clear if the discussions on national qualification frameworks (NQF in Eastern Europe would lead to the new standards and qualifications development, or initiate the reforms in education and training. Now, there is evidence of more countries using the NQFs to promote a dialogue between the public and private sectors on the expected outcomes of educational process. In some countries, the private sector has even taken the lead in the NQF discussions, being increasingly involved in their implementation. This is a fundamentally new paradigm in education policies and a cornerstone of the demand driven education and training. Each country is following its own patterns while moving to the comparable results. However, this is just the initial stage of NQF implementation. The author regards learning by doing and the local expertise expansion as the key challenges of the coming years. Although the reforms take time, they increasingly tend to become a shared public and private responsibility.

  12. Preliminary Hanford Waste Vitrification Plan Waste Form Qualification Plan

    International Nuclear Information System (INIS)

    Nelson, J.L.

    1987-09-01

    This Waste Form Qualification Plan describes the waste form qualification activities that will be followed during the design and operation of the Hanford Waste Vitrification Plant to ensure that the vitrified Hanford defense high-level wastes will meet the acceptance requirements of the candidate geologic repositories for nuclear waste. This plan is based on the defense waste processing facility requirements. The content of this plan is based on the assumption that the Hanford Waste Vitrification Plant high-level waste form will be disposed of in one of the geologic repository projects. Proposed legislation currently under consideration by Congress may change or delay the repository site selection process. The impacts of this change will be assessed as details of the new legislation become available. The Plan describes activities, schedules, and programmatic interfaces. The Waste Form Qualification Plan is updated regularly to incorporate Hanford Waste Vitrification Plant-specific waste acceptance requirements and to serve as a controlled baseline plan from which changes in related programs can be incorporated. 10 refs., 5 figs., 5 tabs

  13. Qualification of the flight-critical AFTI/F-16 digital flight control system. [Advanced Fighter Technology Integration

    Science.gov (United States)

    Mackall, D. A.; Ishmael, S. D.; Regenie, V. A.

    1983-01-01

    Qualification considerations for assuring the safety of a life-critical digital flight control system include four major areas: systems interactions, verification, validation, and configuration control. The AFTI/F-16 design, development, and qualification illustrate these considerations. In this paper, qualification concepts, procedures, and methodologies are discussed and illustrated through specific examples.

  14. Qualification of γ-heating calculation in nuclear reactors

    International Nuclear Information System (INIS)

    Ravaux, Simon

    2013-01-01

    During the last few years, the γ-heating issue has gained in stature, mainly for the safety of the 3. generation reactors in which a stainless steel reflector is inserted. The purpose of this work is the qualification of the needed tools for calculation of the γ-heating in the nuclear reactors. In a nuclear reactor, all the photons are directly or indirectly produced by the neutron-matter interactions. Thus, the first phase of this work is a critical analysis of the photon production data in the standard nuclear data library. New evaluations have been proposed to the next version of the JEFF library after that some omissions have been found. They have partly been accepted for JEFF-3.2. Two particle-transport codes are currently developed in the CEA: the deterministic code APOLLO2 and the Monte Carlo code TRIPOLI4. The second part of this work is the qualification of both these codes by interpreting an integral experiment called PERLE. The experimental set-up is made by a LWR pin assembly surrounded by a stainless steel reflector in which the γ-heating is measured by Thermo-luminescent Detector (TLD). A calculation scheme has been proposed for both APOLLO2 and TRIPOLI4 in order to calculate the TLD's responses. Comparisons between calculations and measurements have shown that TRIPOLI4 gives a satisfactory estimation of the γ-heating in the reflector. These discrepancies are within the experimental 1 σ uncertainty. Before the qualification, APOLLO2 has been previously validated against TRIPOLI4 reference calculation. This validation gives an estimation of the bias due to the deterministic approximations of the transport equation resolution. The qualification has shown that the discrepancies between APOLLO2 predictions and TLD's measurements are in the same range as experimental uncertainties. (author) [fr

  15. Index of Submarine Medical Officer’s Qualification Theses 1944-1974

    Science.gov (United States)

    1976-04-01

    USING HYPOTHERMIA AND HYPERBARIC CXYGENATI 1972-3011 0 A CASE REPO+ HYPOBARIC HYPOXIA ABOARD A SUBMERGED SUBMARINE 1972-0014 THE EFFECTS OF ACUTE HYPOXIA...G009 LEVEL. VENTILATORY DYNAMICS UNDER HYPERBARIC STATES.= SUBMARINE MEDICAL QUALIFICATION THESES U. So NAVAL SJBMARINE MEDICAL CENTER SUBMARINE BASE...CONNECTICUT. 23 OCT 62 StJRL ____________ 1962-0019 WOO3D W.- - ____ VENTILATORY DYNAMICS UNDER HYPERBARIC STATES.= SUBMARINE MEDICAL QUALIFICATION THESES

  16. Development of equipment qualification requirements for NPP instrumentation and control systems

    International Nuclear Information System (INIS)

    Siora, A. A.; Reshetitskij, S. V.; Harybin, A. V.

    2012-01-01

    The main stages of equipment qualification are presented. The aim of the work is to ensure compatibility between Ukrainian and international requirements. A comparison with US NRC requirements has been done. The approach in equipment qualification is presented for the resistance to: irradiation; dust; seismic motion, vibrations and mechanical impact; environmental impact (temperature, humidity, pressure); power supply parameters etc., as well as the technological testing

  17. Qualification of anticorrosive coatings in nuclear vessels

    International Nuclear Information System (INIS)

    Perez Flores, C.

    1985-01-01

    Test qualifications of the behavior of anticorrosive coating systems used in nuclear vessels in service and under the accident conditions of radiation decontamination, steam chemical resistance, thermal conductivity, weathering accelerated aging are presented and discussed. (author)

  18. Seismic qualification of the rotary relay for use in the Trojan and Diablo Canyon Auxiliary Safeguards Cabinets

    International Nuclear Information System (INIS)

    Riggio, M.D.; Jarecki, S.J.

    1977-10-01

    This report presents the results of the analysis performed for the seismic qualification of the rotary relay for use in the Trojan and Diablo Canyon Auxiliary Safeguards Cabinets. A finite element model of the cabinet was developed from seismic test results. This model was analytically subjected to a simulated 3D floor acceleration time history that enveloped, simultaneously, the Trojan and the June 1969 Diablo Canyon Safe Shutdown Earthquake requirements. The dynamic response of the cabinet at the mounting location of the rotary relays was determined. The calculated acceleration time histories were converted to response spectra and these response spectra were compared to the test response spectra successfully achieved during the rotary relay seismic qualification tests. It was found that the dynamic motion levels at the rotary relays, when mounted in the Trojan or Diablo Canyon Auxiliary Safeguards Cabinets, do not exceed the levels for which they were previously seismically qualified by tests. Consequently, the rotary relays are seismically qualified for use in the Trojan or Diablo Canyon Auxiliary Safeguards Cabinets

  19. Qualifications and Skills: The Organisational Perspective

    Science.gov (United States)

    Dafou, Efthimia

    2009-01-01

    This paper portrays the inferences that employers in Greece draw from particular aspects of study programmes, as recorded on educational qualifications. Based on semi-structured interviews with human resource managers in 37 industrial and service organisations and general directors of careers offices in eight higher education institutions, and…

  20. Qualification of code-Saturne for thermal-hydraulics single phase nuclear applications

    International Nuclear Information System (INIS)

    Archambeau, F.; Bechaud, C.; Gest, B.; Martin, A.; Sakiz, M.

    2003-01-01

    Code-Saturne is a general finite volume CFD (computational fluid dynamics) code developed by Electricite de France (EDF) under quality assurance for 2- and 3-dimensional simulations, laminar and turbulent flows, conjugate heat transfer (coupling with thermal code SYRTHES), including combustion modelling and a Lagrangian module. A very large range of meshes can be used. The solver relies on a finite volume method on arbitrary meshes (hybrid, with hanging nodes, any type of element). All variables are located at the cell centres. The solver is time marching, with a predictor-corrector scheme for Navier-Stokes equations. Standard Reynolds Average Navier-Stokes modelling (RANS) is included (k-epsilon, RSM). Code-Saturne is used by EDF in various industrial fields such as process engineering, aeraulics, combustion and nuclear applications. The present paper describes the qualification phase carried out during 2001 for single-phase nuclear applications. Indeed, once an industrial product has been released and validated, it is of major importance, especially in this particular field related to safety matters, to demonstrate the ability of the code to help engineers produce satisfactory conclusions to industrial problems. In coherence with analyses and best practice guidelines such as those published by the ERCOFTAC Special Interest Group, it seemed important to base the qualification phase on well defined and documented experimental facilities, sufficiently complex to be representative of industrial studies. Much attention has been devoted to evaluating sensitivity to numerical parameters such as grid refinement, time step... Moreover, the qualification studies have been carried out in real-life conditions, that is in limited time, with industrial limitations on the number of grid cells, and by the teams usually producing such studies, so as to integrate a real industrial process in the qualification phase. Two test cases chosen to assess certain types of flows in PWR