Sample records for environmental permits including

  1. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  2. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  3. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  4. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  5. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  6. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  7. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  8. Waste feed delivery environmental permits and approvals plan

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site's Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan

  9. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  10. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  11. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  12. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  13. 10 CFR 205.328 - Environmental requirements for Presidential Permits-Alternative 1.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.328 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... responsible for the costs of preparing any necessary environmental document, including an Environmental Impact...

  14. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  15. ENVIRONMENTAL PERMITTING IN ETHIOPIA: NO RESTRAINT ON ...

    African Journals Online (AJOL)

    power, such that potentially polluting businesses cannot open or continue to operate ... For a historical overview of international cooperation to solve environmental problem .... The Green Revolution is the movement of technological advances.

  16. Environmental permits in Arab Gulf countries - local government perspective

    International Nuclear Information System (INIS)

    Kuczynski, L.

    2002-01-01

    The legacy of past environmentally careless oil and gas exploration practices is becoming more apparent as time goes by and our understanding of causes and results increase. In many petroleum producing countries and in Arab Gulf countries in particular, this understanding has resulted in greater social demand for environmental protection and responsible exploitation of limited resources. In response to this demand, governments of the Gulf Region are paying increasingly more attention to the responsible management of environmental impacts of new developments. As a result, most of them require developers to obtain environmental permits supported by a variety of environmental baseline studies, Environmental Impact Assessments and comprehensive Environmental Management Plans. These local environmental requirements are similar to those in North America and Europe, although there are some important differences on account of local environmental, historical and socioeconomic conditions. Developers, who choose to ignore them, often find their projects caught in a web of unfamiliar environmental regulations or administrative procedures that may cause costly and unnecessary delays. Based on the author's Canadian and Arab Gulf regulatory experience, this paper describes some common causes that may delay obtaining environmental permits or cause cancellation of a project, and provides ideas to assist companies in securing necessary permits and licenses. (author)

  17. Article Including Environmental Barrier Coating System

    Science.gov (United States)

    Lee, Kang N. (Inventor)

    2015-01-01

    An enhanced environmental barrier coating for a silicon containing substrate. The enhanced barrier coating may include a bond coat doped with at least one of an alkali metal oxide and an alkali earth metal oxide. The enhanced barrier coating may include a composite mullite bond coat including BSAS and another distinct second phase oxide applied over said surface.

  18. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  19. Including environmental concerns in energy policies

    International Nuclear Information System (INIS)

    Potier, Michel

    2014-05-01

    In this article, the author comments the different impacts on the environment and risks related to energy, provided that all energies have an impact on the environment (renewable energies are generally cleaner than fossil energies) and these impacts can be on human health, ecosystems, buildings, crops, landscapes, and climate change. He comments the efforts made in the search for a higher energetic efficiency, and proposes an overview of the various available tools implemented by environmental policies in the energy sector: regulatory instruments, economic instruments, negotiated agreements, and informational instruments. He comments the implementation of an energetic taxing aimed at developing a greater respect of the environment

  20. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  1. 10 CFR 205.329 - Environmental requirements for Presidential Permits-Alternative 2.

    Science.gov (United States)

    2010-01-01

    ... Facilities for Transmission of Electric Energy at International Boundaries § 205.329 Environmental... 10 Energy 3 2010-01-01 2010-01-01 false Environmental requirements for Presidential Permits... such Presidential Permits: (1) ERA will determine whether an Environmental Impact Statement (EIS) or an...

  2. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  3. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  4. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  5. 76 FR 52656 - Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application...

    Science.gov (United States)

    2011-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14211-000] Rhode Island Department of Environmental Management; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 10, 2011, the Rhode Island Department of Environmental Management...

  6. Environmental site assessments should include radon gas testing

    International Nuclear Information System (INIS)

    Nardi, M.A.

    1991-01-01

    There are two emerging influences that will require radon gas testing as part of many property transfers and most site assessments. These requirements come from lending regulators and state legislatures. Fannie Mae and others have developed environmental investigation guidelines for the purchase of environmentally contaminated real estate. These guidelines include radon gas testing for many properties. Several states have enacted laws that require environmental disclosure forms be prepared to ensure that the parties involved in certain real estate transactions are aware of the environmental liabilities that may come with the transfer of property. Indiana has recently enacted legislation that would require the disclosure of the presence of radon gas on many commercial real estate transactions. With more lenders and state governments likely to follow this trend, radon gas testing should be performed during all property transfers and site assessment to protect the parties involved from any legal liabilities

  7. Radiation and nuclear safety included in the environmental health programme

    International Nuclear Information System (INIS)

    Salomaa, S.

    1996-01-01

    Finland is currently preparing a national environmental health programme, the objective of which is to chart the main environmental health problems in Finland, to identify means for securing a healthy environment, and to draw up a practical action programme for preventing and rectifying problems pertaining to environmental health. Radiation and nuclear safety form an essential part of preventive health care. The action programme is based on decisions and programmes approved at the WHO Conference on the Environment and Health, held in Helsinki in June 1994. In addition to the state of the Finnish environment and the health of the Finnish population, the programme addresses the relevant international issues, in particular in areas adjacent to Finland. The Committee on Environmental Health is expected to complete its work by the end of the year. A wide range of representatives from various branches of administration have contributed to the preparation of the programme. Besides physical, biological and chemical factors, the environmental factors affecting health also include the physical environment and the psychological, social and aesthetic features of the environment. Similarly, environmental factors that have an impact on the health of present or future generations, on the essential preconditions of life and on the quality of life are investigated. The serious risk to nature caused by human actions is also considered as a potential risk to human health. (orig.)

  8. 40 CFR 158.2174 - Experimental use permit microbial pesticides nontarget organisms and environmental fate data...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit microbial... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS... controls the target insect pest by a mechanism of infectivity; i.e., may create an epizootic condition in...

  9. 77 FR 1501 - Special Purpose Permit Application; Draft Environmental Assessment; Hawaii-Based Shallow-Set...

    Science.gov (United States)

    2012-01-10

    ...-FF01M01000] Special Purpose Permit Application; Draft Environmental Assessment; Hawaii-Based Shallow-Set... the operation of the Hawaii-based shallow-set longline fishery that targets swordfish (Xiphias gladius... albatross, by NMFS in its regulation of the shallow-set longline fishery based in Hawaii. This fishery...

  10. Environmental standard review plans for the environmental review of construction permit applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-05-01

    Information is presented concerning environmental descriptions; plant description; environmental impacts of construction; environmental impacts of station operation; environmental measurements and monitoring programs; environmental impacts of postulated accidents involving radioactive materials; the need for the plant; alternatives to the project; and evaluation of the proposed action

  11. Environmental accounts. Environmentally related taxes, subsidies and emission permits; Miljoerelaterade skatter, subventioner och utslaeppsraetter

    Energy Technology Data Exchange (ETDEWEB)

    Cederlund, Maja; Brolinson, Hanna; Palm, Viveka

    2010-12-15

    Environmental Economic instruments is seen as an important component towards a sustainable society. In Prop. (proposition) 2009/10:155 'Swedish environmental objectives - for a more effective environmental' the Ministry of the Environment says that 'We must therefore work to improve the price signals by internalising external environmental costs and increase the use of economic instruments in environmental policy.' Statistics Sweden have now for the first time quantified the environmental economic instruments, both individually and together. In addition, the results are broken down by industry and for most time series can be presented. The result of this work is presented in this report

  12. Transforming environmental permitting and compliance policies to promote pollution prevention: Removing barriers and providing incentives to foster technology innovation, economic productivity, and environmental protection. Final report

    International Nuclear Information System (INIS)

    Berg, D.R.; Kerr, R.L.; Fleischer, S.; Gorsen, M.; Harris, E.

    1993-04-01

    The Technology Innovation and Economics (TIE) Committee, a standing committee of EPA's National Advisory Council for Environmental Policy and Technology (NACEPT), has concluded that major changes are needed in federal and state permitting and compliance programs to encourage adoption of practical pollution prevention approaches to environmental protection. The Committee recommends seven major areas for improvement, including: (1) Redesigning permit procedures to encourage regulated facilities to expand multi-media and pollution prevention environmental improvement efforts; (2) Accelerating development and use of innovative pollution prevention technologies and techniques through special permitting and review procedures during RD ampersand D and commercialization phases; (3) Developing and expanding federal and state pollution prevention enforcement initiative; (4) Supporting state initiatives in pollution prevention facility planning; (5) Expanding pollution prevention-related training, educational and technology diffusion efforts to better reach managers in all sectors of the economy; (6) Altering personnel reward systems to encourage EPA staff to champion pollution prevention; (7) Expanding and publicizing the system of national awards honoring outstanding pollution prevention research, training and technology implementation

  13. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Science.gov (United States)

    2010-01-01

    ...-water-cooled nuclear power reactors, the environmental report must contain the basis for evaluating the contribution of the environmental effects of fuel cycle activities for the nuclear power reactor. (4) Each... paragraph. For other than light-water-cooled nuclear power reactors, the environmental report shall contain...

  14. 76 FR 59423 - Drakes Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes...

    Science.gov (United States)

    2011-09-26

    ... commercial production, harvesting, processing, and sale of shellfish at Point Reyes National Seashore. The... Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes National... Drakes Bay Oyster Company Special-use permit in Drakes Estero, Point Reyes National Seashore, California...

  15. Including environmental concerns in management strategies for depleted uranium hexafluoride

    International Nuclear Information System (INIS)

    Goldberg, M.; Avci, H.I.; Bradley, C.E.

    1995-01-01

    One of the major programs within the Office of Nuclear Energy, Science, and Technology of the US Department of Energy (DOE) is the depleted uranium hexafluoride (DUF 6 ) management program. The program is intended to find a long-term management strategy for the DUF 6 that is currently stored in approximately 46,400 cylinders at Paducah, KY; Portsmouth, OH; and Oak Ridge, TN, USA. The program has four major components: technology assessment, engineering analysis, cost analysis, and the environmental impact statement (EIS). From the beginning of the program, the DOE has incorporated the environmental considerations into the process of strategy selection. Currently, the DOE has no preferred alternative. The results of the environmental impacts assessment from the EIS, as well as the results from the other components of the program, will be factored into the strategy selection process. In addition to the DOE's current management plan, other alternatives continued storage, reuse, or disposal of depleted uranium, will be considered in the EIS. The EIS is expected to be completed and issued in its final form in the fall of 1997

  16. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Science.gov (United States)

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  17. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Oscillating Water Column Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects, as well as expert opinion of marine environmental research professionals. Cost estimates have been developed at the pilot and commercial scale. The reference model described in this document is an oscillating water column device deployed in Northern California at approximately 50 meters water depth.

  18. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  19. Public choice and environmental regulation: tradable permit systems in the United States and CO2 taxation in Europe. New Horizons in Environmental Economics series

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    Svendsen provides a comprehensive description and assessment of the actual experience with systems of tradable permits for environmental management. Moreover, he puts this treatment in a public-choice framework so that we can understand why policy makers in Europe have chosen green taxes, while t...... their counterparts in the United States have opted for systems of tradable permits. The book is a valuable source for a basic understanding of the theory, the and the political economy of incentive-based policy instruments....

  20. Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis.

    Science.gov (United States)

    Riley, Emily; Harris, Patrick; Kent, Jennifer; Sainsbury, Peter; Lane, Anna; Baum, Fran

    2018-05-10

    Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considered in EAs of four major transport projects in Australia. We developed a comprehensive coding framework to analyse the Environmental Impact Statements (EISs) of four transport infrastructure projects: three road and one light rail. The coding framework was designed to capture how health was directly and indirectly included. We found that health was partially considered in all four EISs. In the three New South Wales (NSW) projects, but not the one South Australian project, this was influenced by the requirements issued to proponents by the government which directed the content of the EIS. Health was assessed using human health risk assessment (HHRA). We found this to be narrow in focus and revealed a need for a broader social determinants of health approach, using multiple methods. The road assessments emphasised air quality and noise risks, concluding these were minimal or predicted to improve. The South Australian project was the only road project not to include health data explicitly. The light rail EIS considered the health benefits of the project whereas the others focused on risk. Only one project considered mental health, although in less detail than air quality or noise. Our findings suggest EIAs lag behind the known evidence linking transport infrastructure to health. If health is to be comprehensively included, a more complete model of health is required, as well as a shift away from health risk assessment as the main method used. This needs to be mandatory for all significant developments. We also found that considering health only at the EIA stage may be a significant

  1. The Contribution of Environmental Siting and Permitting Requirements to the Cost of Energy for Wave Energy Devices

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Geerlofs, Simon H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanna, Luke A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-06-01

    Responsible deployment of marine and hydrokinetic (MHK) devices in estuaries, coastal areas, and major rivers requires that biological resources and ecosystems be protected through siting and permitting (consenting) processes. Scoping appropriate deployment locations, collecting pre-installation (baseline) and post-installation data all add to the cost of developing MHK projects, and hence to the cost of energy. Under the direction of the U.S. Department of Energy, Pacific Northwest National Laboratory scientists have developed logic models that describe studies and processes for environmental siting and permitting. Each study and environmental permitting process has been assigned a cost derived from existing and proposed tidal, wave, and riverine MHK projects. Costs have been developed at the pilot scale and for commercial arrays for a surge wave energy converter

  2. 77 FR 25129 - Environmental Impact Statement for Issuance of a Special Use Permit for the Continued Operation...

    Science.gov (United States)

    2012-04-27

    ... Use Permit for the Continued Operation of the Winchester Canyon Gun Club; Los Padres National Forest... environmental impact statement (EIS). SUMMARY: The USDA, Forest Service, Los Padres National Forest, gives...: Send written comments to: Los Padres National Forest, 6755 Hollister Avenue, Suite 150, Goleta, CA...

  3. Consolidated permit regulations and hazardous waste management system: Environmental Protection Agency. Notice of issuance of regulation interpretation memorandum.

    Science.gov (United States)

    1981-12-10

    The Environmental Protection Agency (EPA) is issuing today a Regulation Interpretation Memorandum (RIM) which provides official interpretation of the issue of whether a generator who accumulates hazardous waste pursuant to 40 CFR 262.34, may qualify for interim status after November 19, 1980. This issue arose when the requirements for submitting a Part A permit application (one of the prerequisites to qualifying for interim status) were amended on November 19, 1980. The provisions interpreted today are part of the Consolidated Permit Regulations promulgated under Subtitle C of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as amended (RCRA).

  4. RCRA Part B permit modifications for cost savings and increased flexibility at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Jierree, C.; Ticknor, K.

    1996-10-01

    With shrinking budgets and downsizing, a need for streamlined compliance initiatives became evident at the Rocky Flats Environmental Technology Site (RFETS). Therefore, Rocky Mountain Remediation Services (RMRS) at the RFETS successfully and quickly modified the RFETS RCRA Part B Permit to obtain significant cost savings and increased flexibility. This 'was accomplished by requesting operations personnel to suggest changes to the Part B Permit which did not diminish overall compliance and which would be most. cost beneficial. The U.S. Department of Energy (DOE) subsequently obtained approval of those changes from the Colorado Department of Public Health and the Environment (CDPHE)

  5. Developing pipeline risk methodology for environmental license permit; Metodologia para avaliacao do risco em dutos, no licenciamento ambiental

    Energy Technology Data Exchange (ETDEWEB)

    Arruda, Paulo; Naime, Andre [Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renovaveis (IBAMA), Brasilia, DF (Brazil). Diretoria de Licenciamento e Qualidade Ambiental; Serpa, Ricardo [Companhia de Tecnologia de Saneamento Ambiental (CETESB), Sao Paulo, SP (Brazil). Setor de Analise de Riscos; Mendes, Renato F. [PETROBRAS Engenharia, RJ (Brazil); Ventura, Gilmar [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil)

    2005-07-01

    Some new pipelines undertakings aim to establish connection between gas provinces in the Southeast and consumers in the Northeast of Brazil, in order to supply medium consuming centers and regions with minor potential of development. Consulting companies are carrying out Environmental Assessments studies and among them is the Risk Analyses of these pipeline transmission systems, in order to receive environmental permits by IBAMA, the Federal Brazilian Environmental Agency. In addition, existing interstate pipeline systems which are under IBAMA regulation will also require the same attention. For the purpose of defining a Pipeline Risk Analysis Protocol with methodology and risk criteria, with minimum risk analysis information on a comprehensive process, it has been decided for a 'tour de force' formed by experts from IBAMA and PETROBRAS engineers. The risk assessment protocol is focus on the risk to communities in the neighborhood of these pipelines and on the potential damage to the environment near and far from the ROW. The joined work ended up in two protocols, which attempt to provide environmental license permits for oil pipeline and gas pipelines with minimum contents for risk analysis studies. Another aspect is the environmental risk that has been focused on the contingency plan approach, since there are no consolidated environmental risk criteria for application as a common worldwide sense. The environmental risk mapping - MARA methodology will indicate areas with potential to be affected by leakages along a pipeline system. (author)

  6. 47 CFR 1.1311 - Environmental information to be included in the environmental assessment (EA).

    Science.gov (United States)

    2010-10-01

    ... a residential area, the EA must also address the impact of this lighting upon the residents. (2) A... concerning the proposal's environmental impact, if any. The EA shall deal specifically with any feature of... land utilized (e.g., deforestation, water diversion, wetland fill, or other extensive change of surface...

  7. Public choice and environmental regulation. Tradable permit systems in the United States and CO{sub 2} taxation in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Tinggaard Svendsen, G [The Aarhus School of Business, Dept. of Economics (Denmark)

    1996-05-01

    The thesis raises the question whether taxation or permit markets are most cost-effective in environmental regulation. The general answer given by the author is that a combination of these two economic control measures would minimize the cost of CO{sub 2} abatement. A `grandfather` permit market can prove to be more cost-effective than a CO{sub 2} tax with regard to organized interests: first because in the near future both industry and electric utilities will experience a growing competition in the common market, secondly because permit markets offer essential results to the environmental organizations. Taxation can come in useful where interests are poorly organized, like in households and transportation sector. Taxes can force environmental improvements through as well as eliminate tax distortion due to income tax reduction. Thus the state has a strong economic interest in development of economic incentive measures, increasing production and exports. The use of a comparative method and the rationale for transferring US experience to European ground is considered. CO{sub 2} taxation in Denmark and the failed attempt to introduce a common CO{sub 2} tax in the EU is analyzed. Perspectives of a CO{sub 2} market on an EU scale and global scale are discussed. (EG) 139 refs.

  8. Public choice and environmental regulation. Tradable permit systems in the United States and CO2 taxation in Europe

    International Nuclear Information System (INIS)

    Tinggaard Svendsen, G.

    1996-05-01

    The thesis raises the question whether taxation or permit markets are most cost-effective in environmental regulation. The general answer given by the author is that a combination of these two economic control measures would minimize the cost of CO 2 abatement. A 'grandfather' permit market can prove to be more cost-effective than a CO 2 tax with regard to organized interests: first because in the near future both industry and electric utilities will experience a growing competition in the common market, secondly because permit markets offer essential results to the environmental organizations. Taxation can come in useful where interests are poorly organized, like in households and transportation sector. Taxes can force environmental improvements through as well as eliminate tax distortion due to income tax reduction. Thus the state has a strong economic interest in development of economic incentive measures, increasing production and exports. The use of a comparative method and the rationale for transferring US experience to European ground is considered. CO 2 taxation in Denmark and the failed attempt to introduce a common CO 2 tax in the EU is analyzed. Perspectives of a CO 2 market on an EU scale and global scale are discussed. (EG) 139 refs

  9. 77 FR 38051 - EPA Activities To Promote Environmental Justice in the Permit Application Process

    Science.gov (United States)

    2012-06-26

    ... community. In addition to their important role as a source of employment and economic stability within a... economic stability within a community, facilities play other roles. Many facilities, for example, have... sustainability, stability and--ultimately--profitability. Early and meaningful dialogue between the permit...

  10. 75 FR 52778 - Preparation of an Environmental Impact Statement for Issuance of an Incidental Take Permit...

    Science.gov (United States)

    2010-08-27

    ... considered in the final decision on the permit application. DATES: The public comment period that closed on... information concerning the Indiana bat and Virginia big-eared bat, as well as unlisted bats and birds; (2) relevant data concerning wind power and bat and bird interactions; (3) additional information concerning...

  11. 78 FR 27196 - Modification of Permit Application and Intent for Additional Public Scoping for an Environmental...

    Science.gov (United States)

    2013-05-09

    ... Application and Intent for Additional Public Scoping for an Environmental Impact Statement for the Port of... Mississippi State Port Authority (MSPA) for which an Environmental Impact Statement (EIS) is being prepared... Low-Income Populations; Executive Order 13045, Protection of Children from Environmental Health Risks...

  12. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  13. Integrating indicators in a national accounting matrix including environmental accounts (NAMEA)

    International Nuclear Information System (INIS)

    De Haan, M.; Keuning, S.J.; Bosch, P.R.

    1993-01-01

    Five environmental indicators are conceptually and numerically integrated into a National Accounting Matrix including Environmental Accounts (NAMEA) for 1989. As a consequence, these estimates are directly comparable with outcomes of major macro-economic aggregates in the conventional accounts. In the NAMEA, emissions of all kinds of polluting agents are recorded by industry and by consumption purpose. Subsequently, these agents are grouped into five environmental themes: greenhouse effect, ozone layer depletion, acidification, eutrophication and waste accumulation. The contributions of agents to certain themes are expressed in theme-related environmental stress equivalents. Per theme, these stress equivalents are confronted with policy norms set by the Netherlands government for the year 2000. This results in a statistical framework at a meso-level from which integrated economic and environmental indicators are derived. The NAMEA may also serve as a data base and analytical device for modelling interactions between the national economy and changes in the environment. 13 tabs., 2 app., 32 refs

  14. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    Energy Technology Data Exchange (ETDEWEB)

    Holzemer, Michael J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hart, Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  15. 77 FR 46516 - Notice of Availability of the Final Environmental Impact Statement, Including a Programmatic...

    Science.gov (United States)

    2012-08-03

    ... Impact Statement, Including a Programmatic Agreement, for the Clark, Lincoln, and White Pine Counties...) has prepared a Final Environmental Impact Statement (EIS) and a Programmatic Agreement (PA), which is.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver FOR FURTHER INFORMATION CONTACT: Penny Woods...

  16. 76 FR 34097 - Notice of Availability of the Draft Environmental Impact Statement, Including a Draft...

    Science.gov (United States)

    2011-06-10

    ... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...) has prepared a Draft Environmental Impact Statement (EIS) and a Draft Programmatic Agreement (PA.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver. The Draft EIS describes and analyzes SNWA's...

  17. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  18. The Remote Handled Immobilization Low-Activity Waste Disposal Facility Environmental Permits and Approval Plan

    International Nuclear Information System (INIS)

    DEFFENBAUGH, M.L.

    2000-01-01

    The purpose of this document is to revise Document HNF-SD-ENV-EE-003, ''Permitting Plan for the Immobilized Low-Activity Waste Project, which was submitted on September 4, 1997. That plan accounted for the interim storage and disposal of Immobilized-Low Activity Waste at the existing Grout Treatment Facility Vaults (Project W-465) and within a newly constructed facility (Project W-520). Project W-520 was to have contained a combination of concrete vaults and trenches. This document supersedes that plan because of two subsequent items: (1) A disposal authorization that was received on October 25, 1999, in a U. S. Department of Energy-Headquarters, memorandum, ''Disposal Authorization Statement for the Department of Energy Hanford site Low-Level Waste Disposal facilities'' and (2) ''Breakthrough Initiative Immobilized Low-Activity Waste (ILAW) Disposal Alternative,'' August 1999, from Lucas Incorporated, Richland, Washington. The direction within the U. S. Department of Energy-Headquarters memorandum was given as follows: ''The DOE Radioactive Waste Management Order requires that a Disposal authorization statement be obtained prior to construction of new low-level waste disposal facility. Field elements with the existing low-level waste disposal facilities shall obtain a disposal authorization statement in accordance with the schedule in the complex-wide Low-Level Waste Management Program Plan. The disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate CERCLA documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. A disposal authorization statement is a part of the required radioactive waste management basis for a disposal facility. Failure to obtain a disposal authorization statement or record of decision shall result in shutdown of an operational

  19. BALANCED SCORECARDS EVALUATION MODEL THAT INCLUDES ELEMENTS OF ENVIRONMENTAL MANAGEMENT SYSTEM USING AHP MODEL

    Directory of Open Access Journals (Sweden)

    Jelena Jovanović

    2010-03-01

    Full Text Available The research is oriented on improvement of environmental management system (EMS using BSC (Balanced Scorecard model that presents strategic model of measurem ents and improvement of organisational performance. The research will present approach of objectives and environmental management me trics involvement (proposed by literature review in conventional BSC in "Ad Barska plovi dba" organisation. Further we will test creation of ECO-BSC model based on business activities of non-profit organisations in order to improve envir onmental management system in parallel with other systems of management. Using this approach we may obtain 4 models of BSC that includ es elements of environmen tal management system for AD "Barska plovidba". Taking into acc ount that implementation and evaluation need long period of time in AD "Barska plovidba", the final choice will be based on 14598 (Information technology - Software product evaluation and ISO 9126 (Software engineering - Product quality using AHP method. Those standards are usually used for evaluation of quality software product and computer programs that serve in organisation as support and factors for development. So, AHP model will be bas ed on evolution criteria based on suggestion of ISO 9126 standards and types of evaluation from two evaluation teams. Members of team & will be experts in BSC and environmental management system that are not em ployed in AD "Barska Plovidba" organisation. The members of team 2 will be managers of AD "Barska Plovidba" organisation (including manage rs from environmental department. Merging results based on previously cr eated two AHP models, one can obtain the most appropriate BSC that includes elements of environmental management system. The chosen model will present at the same time suggestion for approach choice including ecological metrics in conventional BSC model for firm that has at least one ECO strategic orientation.

  20. Determination on Whether Specialty Minerals Inc. Must be Included in the Simpson Paper Company Shasta Mill Application for a Title V Operating Permit as a Support Facility.

    Science.gov (United States)

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  1. A surplus production model including environmental effects: Application to the Senegalese white shrimp stocks

    Science.gov (United States)

    Thiaw, Modou; Gascuel, Didier; Jouffre, Didier; Thiaw, Omar Thiom

    2009-12-01

    In Senegal, two stocks of white shrimp ( Penaeusnotialis) are intensively exploited, one in the north and another in the south. We used surplus production models including environmental effects to analyse their changes in abundance over the past 10 years and to estimate their Maximum Sustainable Yield (MSY) and the related fishing effort ( EMSY). First, yearly abundance indices were estimated from commercial statistics using GLM techniques. Then, two environmental indices were alternatively tested in the model: the coastal upwelling intensity from wind speeds provided by the SeaWifs database and the primary production derived from satellite infrared images of chlorophyll a. Models were fitted, with or without the environmental effect, to the 1996-2005 time series. They express stock abundance and catches as functions of the fishing effort and the environmental index (when considered). For the northern stock, fishing effort and abundance fluctuate over the period without any clear trends. The model based on the upwelling index explains 64.9% of the year-to-year variability. It shows that the stock was slightly overexploited in 2002-2003 and is now close to full exploitation. Stock abundance strongly depends on environmental conditions; consequently, the MSY estimate varies from 300 to 900 tons according to the upwelling intensity. For the southern stock, fishing effort has strongly increased over the past 10 years, while abundance has been reduced 4-fold. The environment has a significant effect on abundance but only explains a small part of the year-to-year variability. The best fit is obtained using the primary production index ( R2 = 0.75), and the stock is now significantly overfished regardless of environmental conditions. MSY varies from 1200 to 1800 tons according to environmental conditions. Finally, in northern Senegal, the upwelling is highly variable from year to year and constitutes the major factor determining productivity. In the south, hydrodynamic

  2. Decommissioning in the oil and gas industry and the inclusion of decommissioning permit in the Brazilian system of environmental permitting - first thoughts; O descomissionamento na industria de petroleo e gas e a inclusao da licenca de desinstalacao no procedimento de licenciamento ambiental brasileiro - primeiras reflexoes

    Energy Technology Data Exchange (ETDEWEB)

    Bezerra, Luiz Gustavo Escorcio [Stroeter e Royster Advogados, Sao Paulo, SP (Brazil)]|[Universidade do Estado do Rio de Janeiro (UERJ), RJ (Brazil). Faculdade de Direito. Programa de Estudos e Pesquisa em Direito do Petroleo (ANP - PRH33)

    2005-07-01

    This paper aims to promote discussions regarding the decommissioning issue, its role in the protection of the environment and the feasibility of the inclusion of a Decommissioning Permit in the Brazilian System of Environmental Permitting. (author)

  3. The Remote Handled Immobilization Low Activity Waste Disposal Facility Environmental Permits & Approval Plan

    Energy Technology Data Exchange (ETDEWEB)

    DEFFENBAUGH, M.L.

    2000-08-01

    The purpose of this document is to revise Document HNF-SD-ENV-EE-003, ''Permitting Plan for the Immobilized Low-Activity Waste Project, which was submitted on September 4, 1997. That plan accounted for the interim storage and disposal of Immobilized-Low Activity Waste at the existing Grout Treatment Facility Vaults (Project W-465) and within a newly constructed facility (Project W-520). Project W-520 was to have contained a combination of concrete vaults and trenches. This document supersedes that plan because of two subsequent items: (1) A disposal authorization that was received on October 25, 1999, in a U. S. Department of Energy-Headquarters, memorandum, ''Disposal Authorization Statement for the Department of Energy Hanford site Low-Level Waste Disposal facilities'' and (2) ''Breakthrough Initiative Immobilized Low-Activity Waste (ILAW) Disposal Alternative,'' August 1999, from Lucas Incorporated, Richland, Washington. The direction within the U. S. Department of Energy-Headquarters memorandum was given as follows: ''The DOE Radioactive Waste Management Order requires that a Disposal authorization statement be obtained prior to construction of new low-level waste disposal facility. Field elements with the existing low-level waste disposal facilities shall obtain a disposal authorization statement in accordance with the schedule in the complex-wide Low-Level Waste Management Program Plan. The disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate CERCLA documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. A disposal authorization statement is a part of the required radioactive waste management basis for a disposal facility. Failure to obtain a disposal authorization statement

  4. Fort Calhoun Station, Unit 1. Annual operation report: January-December 1977 (including environmental report)

    International Nuclear Information System (INIS)

    1978-02-01

    Net electrical energy generated in 1977 was 2,922,683.7 MWH with the generator on line 6,959.8 hours. Information is presented concerning operations, power generation, shutdowns, maintenance, changes, tests, experiments, occupational personnel radiation exposures, and primary coolant chemistry. Data on radioactive effluent releases, meteorology, environmental monitoring, and potential radiation doses to individuals for July 7, 1977 to December 31, 1977 are also included

  5. 78 FR 15737 - Incidental Take Permit Amendment and Supplemental Environmental Assessment for Wind Energy...

    Science.gov (United States)

    2013-03-12

    ...) of dry forest habitat. The revised HCP includes the site plan for the project and detailed information on the areas within Punta Ventana that would be affected by the construction and operation turbine...

  6. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  7. 76 FR 17666 - Endangered and Threatened Wildlife and Plants; Permits; Joint Supplemental Environmental Impact...

    Science.gov (United States)

    2011-03-30

    .... Bartel, Field Supervisor, U.S. Fish and Wildlife Service, 6010 Hidden Valley Road, Suite 101, Carlsbad... harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect or attempt to engage in such....3 to include significant habitat modification or degradation where it actually kills or injures...

  8. 18 CFR 380.16 - Environmental reports for section 216 Federal Power Act Permits.

    Science.gov (United States)

    2010-04-01

    .... (3) Discuss design and operational measures to avoid or reduce risk. (4) Discuss contingency plans... sufficient detail to provide a full understanding of the project including: (i) Plans (overhead view); (ii) Elevations (front view); (iii) Profiles (side view); and (iv) Sections. (2) The applicant may submit...

  9. Interim staff position on environmental qualification of safety-related electrical equipment: including staff responses to public comments. Regulatory report

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1981-07-01

    This document provides the NRC staff positions regarding selected areas of environmental qualification of safety-related electrical equipment, in the resolution of Unresolved Safety Issue A-24, 'Qualification of Class IE Safety-Related Equipment.' The positions herein are applicable to plants that are or will be in the construction permit (CP) or operating license (OL) review process and that are required to satisfy the requirements set forth in either the 1971 or the 1974 version of IEEE-323 standard

  10. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  11. Improvement on a science curriculum including experimental demonstration of environmental radioactivity for secondary school students

    International Nuclear Information System (INIS)

    Watanabe, Kenji; Matsubara, Shizuo; Aiba, Yoshio; Eriguchi, Hiroshi; Kiyota, Saburo; Takeyama, Tetsuji.

    1988-01-01

    A science curriculum previously prepared for teaching environmental radioactivity was modified on the basis of the results of trial instructions in secondary schools. The main subject of the revised curriculum is an understanding of the natural radioactivity through the experimental demonstration about air-borne β and γ ray emitters. The other subjects included are the radioactive decay, the biological effects of radiation, the concept of risk-benefit balance (acceptable level) and the peaceful uses of nuclear energy and radiation. The work sheets and reference data prepared as learning materials are in two levels corresponding to the ability of students for this curriculum. (author)

  12. Economic/Environmental power dispatch for power systems including wind farms

    Directory of Open Access Journals (Sweden)

    Imen BEN JAOUED

    2015-05-01

    Full Text Available This paper presents the problem of the Economic/Environmental power Dispatching (EED of hybrid power system including wind energies. The power flow model for a stall regulated fixed speed wind generator (SR-FSWG system is discussed to assess the steady-state condition of power systems with wind farms. Modified Newton-Raphson algorithm including SR-FSWG is used to solve the load flow equations in which the state variables of the wind generators are combined with the nodal voltage magnitudes and angles of the entire network. The EED problem is a nonlinear constrained multi-objective optimization problem, two competing fuel cost and pollutant emission objectives should be minimized simultaneously while satisfying certain system constraints. In this paper, the resolution is done by the algorithm multi-objective particle swarm optimization (MOPSO. The effectiveness of the proposed method has been verified on IEEE 6-generator 30-bus test system and using MATLAB software package.

  13. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Science.gov (United States)

    2010-07-01

    ... compliance, waste minimization, risk reduction and continual improvement of the environmental management... its compliance with the Environmental Management Plan and applicable federal and state hazardous waste... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  14. Environmental policy and economic efficiency: tradable permits versus regulatory instrument to control air pollution: a comparative approach USA/France

    International Nuclear Information System (INIS)

    Cros, Ch.

    1998-12-01

    The key issue of the thesis paradox of the weak implementation of economic instruments whereas 1) they are theoretically and also empirically considered as efficient; 2) the market imposes itself as the central reference to modem economies; and 3) economic efficiency is nowadays a legitimacy measure of public policies. Two different answers can be given: either theoretical analysis does not enable to explain the real economic efficiency of a political instrument, or environmental policies do not have economic efficiency as their main objective. The analysis take place in a context of a limited rationality and an inter-temporal consistency of public policies. The purpose is to understand the role of economic efficiency criteria during the adoption, building, and evolution of an environmental policy with an analytical point of view, and not a normative one. The institutional analysis of the American and the French pollution control policies, representative of the implementation of a trading permit system for the first, and of a regulatory instrument for the second, prove that the theoretical analysis of an instrument can not explain a real coordination, but only one organizational form among others. An institutional trajectory is the interpretation of policy instruments of policy instruments from 5 fundamental elements: the nature of the legitimacy of the policy; the nature of the regulator hypothesis on the information; the nature of the decision-making basis; the nature of the collective action. A coordination changes when the occurrence of an event moves one of the fundamental elements, and disorganizes the satisfying equilibrium of the agents. Then, the economic efficiency becomes a negotiation point. A political instrument is adopted for its own ability to solve a dysfunction without disrupting the coordination. (author)

  15. Tiny Stowaways: Analyzing the Economic Benefits of a U.S. Environmental Protection Agency Permit Regulating Ballast Water Discharges

    Science.gov (United States)

    Lovell, Sabrina J.; Drake, Lisa A.

    2009-03-01

    The U.S. Environmental Protection Agency has proposed permitting ballast water discharges—a benefit of which would be to reduce the economic damages associated with the introduction and spread of aquatic invasive species. Research on ship-borne aquatic invasive species has been conducted in earnest for decades, but determining the economic damages they cause remains troublesome. Furthermore, with the exception of harmful algal blooms, the economic consequences of microscopic invaders have not been studied, despite their potentially great negative effects. In this paper, we show how to estimate the economic benefits of preventing the introduction and spread of harmful bacteria, microalgae, and viruses delivered in U.S. waters. Our calculations of net social welfare show the damages from a localized incident, cholera-causing bacteria found in shellfish in the Gulf of Mexico, to be approximately 706,000 (2006). On a larger scale, harmful algal species have the potential to be transported in ships’ ballast tanks, and their effects in the United States have been to reduce commercial fisheries landings and impair water quality. We examine the economic repercussions of one bloom-forming species. Finally, we consider the possible translocation within the Great Lakes of a virus that has the potential to harm commercial and recreational fisheries. These calculations illustrate an approach to quantifying the benefits of preventing invasive aquatic microorganisms from controls on ballast water discharges.

  16. Fatigue evaluation including environmental effects for primary circuit components in nuclear power plants

    International Nuclear Information System (INIS)

    Seichter, Johannes; Reese, Sven H.; Klucke, Dietmar

    2013-01-01

    The influence of LWR coolant environment to the lifetime of materials in Nuclear Power Plants is in discussion internationally. Environmental phenomena were investigated in laboratory tests and published in recent years. The discussion is mainly focused both on the transition from laboratory to real plant components and on numerical calculation procedures. Since publishing of the NUREG/CR-6909 report in 2007, formulae for calculating the Fen factors have been modified several times. Various calculation procedures like the so called 'Strain-integrated Method' and 'Simplified Approach' have been published while each approach yields to different results. The recent revision of the calculation procedure, proposed by ANL in 2012, is presented and discussed with regard to possible variations in the results depending on the assumptions made. In German KTA Rules the effect of environmentally assisted fatigue (EAF) is taken into account by means of so called attention thresholds. If the threshold value is exceeded, further measures like NDT, in-service inspections including fracture mechanical evaluations or detailed assessment procedures have to be performed. One way to handle those measures is to apply sophisticated procedures and to show that the calculated CUF is below the defined attention thresholds. On the basis of a practical example, methods and approaches will be discussed and recommendations in terms of avoiding over-conservatism and misinterpretation will be presented.

  17. Fatigue evaluation including environmental effects for primary circuit components in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Seichter, Johannes [Siempelkamp Pruef- und Gutachter-Gesellschaft mbH, Dresden (Germany); Reese, Sven H.; Klucke, Dietmar [Component Technology Global Unit Generation, E.ON Kernkraft GmbH, Hannover (Germany)

    2013-05-15

    The influence of LWR coolant environment to the lifetime of materials in Nuclear Power Plants is in discussion internationally. Environmental phenomena were investigated in laboratory tests and published in recent years. The discussion is mainly focused both on the transition from laboratory to real plant components and on numerical calculation procedures. Since publishing of the NUREG/CR-6909 report in 2007, formulae for calculating the Fen factors have been modified several times. Various calculation procedures like the so called 'Strain-integrated Method' and 'Simplified Approach' have been published while each approach yields to different results. The recent revision of the calculation procedure, proposed by ANL in 2012, is presented and discussed with regard to possible variations in the results depending on the assumptions made. In German KTA Rules the effect of environmentally assisted fatigue (EAF) is taken into account by means of so called attention thresholds. If the threshold value is exceeded, further measures like NDT, in-service inspections including fracture mechanical evaluations or detailed assessment procedures have to be performed. One way to handle those measures is to apply sophisticated procedures and to show that the calculated CUF is below the defined attention thresholds. On the basis of a practical example, methods and approaches will be discussed and recommendations in terms of avoiding over-conservatism and misinterpretation will be presented.

  18. Information management for global environmental change, including the Carbon Dioxide Information Analysis Center

    Energy Technology Data Exchange (ETDEWEB)

    Stoss, F.W. [Oak Ridge National Lab., TN (United States). Carbon Dioxide Information Analysis Center

    1994-06-01

    The issue of global change is international in scope. A body of international organizations oversees the worldwide coordination of research and policy initiatives. In the US the National Science and Technology Council (NSTC) was established in November of 1993 to provide coordination of science, space, and technology policies throughout the federal government. NSTC is organized into nine proposed committees. The Committee on Environmental and Natural Resources (CERN) oversees the US Department of Energy`s Global Change Research Program (USGCRP). As part of the USGCRP, the US Department of Energy`s Global Change Research Program aims to improve the understanding of Earth systems and to strengthen the scientific basis for the evaluation of policy and government action in response to potential global environmental changes. This paper examines the information and data management roles of several international and national programs, including Oak Ridge National Laboratory`s (ORNL`s) global change information programs. An emphasis will be placed on the Carbon Dioxide Information Analysis Center (CDIAC), which also serves as the World Data Center-A for Atmospheric Trace Gases.

  19. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  20. Environmental assessment of passenger transportation should include infrastructure and supply chains

    International Nuclear Information System (INIS)

    Chester, Mikhail V; Horvath, Arpad

    2009-01-01

    To appropriately mitigate environmental impacts from transportation, it is necessary for decision makers to consider the life-cycle energy use and emissions. Most current decision-making relies on analysis at the tailpipe, ignoring vehicle production, infrastructure provision, and fuel production required for support. We present results of a comprehensive life-cycle energy, greenhouse gas emissions, and selected criteria air pollutant emissions inventory for automobiles, buses, trains, and airplanes in the US, including vehicles, infrastructure, fuel production, and supply chains. We find that total life-cycle energy inputs and greenhouse gas emissions contribute an additional 63% for onroad, 155% for rail, and 31% for air systems over vehicle tailpipe operation. Inventorying criteria air pollutants shows that vehicle non-operational components often dominate total emissions. Life-cycle criteria air pollutant emissions are between 1.1 and 800 times larger than vehicle operation. Ranges in passenger occupancy can easily change the relative performance of modes.

  1. Modification of ASTM Standard E1681 on Environmental Cracking to Include Bolt-Load Specimen Testing

    National Research Council Canada - National Science Library

    Underwood, Jean D. M

    1997-01-01

    Benet Laboratories experience with environmental cracking of cannon components has been combined with the technical expertise of various participants at ASTM technical meetings and symposia to develop...

  2. Specialists meeting on properties of primary circuit structural materials including environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-07-01

    The Specialists Meeting on Properties of Primary Circuit Structural Materials of LMFBRs covered the following topics: overview of materials program in different countries; mechanical properties of materials in air; fracture mechanics studies - component related activities; impact of environmental influences on mechanical properties; relationship of material properties and design methods. The purpose of the meeting was to provide a forum for exchange of information on structural materials behaviour in primary circuit of fast breeder reactors. Special emphasis was placed on environmental effects such as influence of sodium and irradiation on mechanical properties of reactor materials.

  3. Calculations of environmental benefits from using geothermal energy must include the rebound effect

    DEFF Research Database (Denmark)

    Atlason, Reynir Smari; Unnthorsson, Runar

    2017-01-01

    and energy production patterns are simulated using data from countries with similar environmental conditions but do not use geothermal or hydropower to the same extent as Iceland. Because of the rapid shift towards renewable energy and exclusion of external energy provision, the country is considered......When considering the environmental benefits from converting to renewable energy sources, the rebound effect is often omitted. In this study, the aim is to investigate greenhouse gas emission reduction inclusive of the rebound effect. We use Iceland as a case study where alternative consumption...

  4. A fatigue analysis including environmental effects for a pipe system in a Swedish BWR

    International Nuclear Information System (INIS)

    Steingrimsdottir, Kristin; Dahlberg, Magnus

    2011-10-01

    A BWR feed water piping system (austenitic steel) has been analyzed with two different fatigue curves and environmental factors. Original fatigue curve from ASME is compared to a new fatigue curve; ANL. The influence of environmental correction factors (Fen) is studied further for the piping system. It is noted that the results apply for this particular system, and general conclusions should be cautiously drawn. Typical for this system is that all dominant loads are within the low-cycle regime. This implies that the change of fatigue curve only leads to limited increases in usage factors. Larger changes can occur if larger number of cycles is within the high-cycle regime

  5. Specialists meeting on properties of primary circuit structural materials including environmental effects

    International Nuclear Information System (INIS)

    1977-01-01

    The Specialists Meeting on Properties of Primary Circuit Structural Materials of LMFBRs covered the following topics: overview of materials program in different countries; mechanical properties of materials in air; fracture mechanics studies - component related activities; impact of environmental influences on mechanical properties; relationship of material properties and design methods. The purpose of the meeting was to provide a forum for exchange of information on structural materials behaviour in primary circuit of fast breeder reactors. Special emphasis was placed on environmental effects such as influence of sodium and irradiation on mechanical properties of reactor materials

  6. Supplemental Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot

    Energy Technology Data Exchange (ETDEWEB)

    Peek, Dennis W. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    The “subject property” is comprised of a parcel of land within the Kirtland Military Reservation, Bernalillo County, New Mexico, as shown on the map in Appendix B of this document. The land requirement for the parking lot addition to the 9940 Main Complex is approximately 2.7 acres. The scope of this Supplemental Environmental Baseline Survey (SEBS) is for the parking lot addition land transfer only. For details on the original 9940 Main Complex see Environmental Baseline Survey, Land Use Permit Request for the 9940 Complex PERM/0-KI-00-0001, August 21, 2003, and for details on the 9940 Complex Expansion see Environmental Baseline Survey, Proposed Land Use Permit Expansion for 9940 DETS Complex, June 24, 2009. The 2.7-acre parcel of land for the new parking lot, which is the subject of this EBS (also referred to as the “subject property”), is adjacent to the southwest boundary of the original 12.3- acre 9940 Main Complex. No testing is known to have taken place on the subject property site. The only activity known to have taken place was the burial of overhead utility lines in 2014. Adjacent to the subject property, the 9940 Main Complex was originally a 12.3-acre site used by the Department of Energy (DOE) under a land use permit from the United States Air Force (USAF). Historical use of the site, dating from 1964, included arming, fusing, and firing of explosives and testing of explosives systems components. In the late 1970s and early 1980s experiments at the 9940 Main Complex shifted toward reactor safety issues. From 1983 to 1988, fuel coolant interaction (FCI) experiments were conducted, as were experiments with conventional high explosives (HE). Today, the land is used for training of the Nuclear Emergency Response community and for research on energetic materials. In 2009, the original complex was expanded to include four additional 20-acre areas: 9940 Training South, 9940 Training East, T-Range 6, and Training West Landing Zone. The proposed use of

  7. Environmental impact assessment including indirect effects--a case study using input-output analysis

    International Nuclear Information System (INIS)

    Lenzen, Manfred; Murray, Shauna A.; Korte, Britta; Dey, Christopher J.

    2003-01-01

    Environmental impact assessment (EIA) is a process covered by several international standards, dictating that as many environmental aspects as possible should be identified in a project appraisal. While the ISO 14011 standard stipulates a broad-ranging study, off-site, indirect impacts are not specifically required for an Environmental Impact Statement (EIS). The reasons for this may relate to the perceived difficulty of measuring off-site impacts, or the assumption that these are a relatively insignificant component of the total impact. In this work, we describe a method that uses input-output analysis to calculate the indirect effects of a development proposal in terms of several indicator variables. The results of our case study of a Second Sydney Airport show that the total impacts are considerably higher than the on-site impacts for the indicators land disturbance, greenhouse gas emissions, water use, emissions of NO x and SO 2 , and employment. We conclude that employing input-output analysis enhances conventional EIA, as it allows for national and international effects to be taken into account in the decision-making process

  8. Fatigue evaluation including environmental effects for primary circuit components in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Seichter, Johannes [Siempelkamp Pruef- und Gutachter-Gesellschaft mbH, Dresden (Germany); Reese, Sven H.; Klucke, Dietmar [E.ON Kernkraft GmbH, Hannover (Germany). Component Technology

    2013-06-01

    The influence of LWR coolant environment to the lifetime of materials in nuclear power plants is being discussed internationally. Environmental phenomena had been investigated in laboratory tests and published in recent years. The discussion is mainly focused both on the transition from laboratory to real plant components and on numerical calculation procedures. Since publishing of the NUREG/CR-6909 report in 2007, formulae for calculating the Fen factors have been modified several times. Various calculation procedures are discussed and recommendations are made how to avoid extremely conservative results. (orig.)

  9. Environmental radioactivity in the North Atlantic region including the Faroe Islands and Greenland. 1990 and 1991

    International Nuclear Information System (INIS)

    Aarkrog, A.; Chen, Q.J.; Dahlgaard, H.; Hansen, H.; Nielsen, S.P.; Strandberg, M.; Buch, E.; Christensen, G.C.; Holm, E.

    1994-01-01

    Measurements of fallout radioactivity in the North Atlantic region including Faroe Islands and Greenland are reported. Strontium-90, cesium-137 and cesium-134 were determined in samples of precipitation, sea water, vegetation, various foodstuffs (including milk in the Faroes), and drinking water. Estimates are given of the mean contents of 90 Sr and 137 Cs in human diet in the Faroes and Greenland in 1990 and 1991. 99 Tc data on marine samples, in particular sea water from the Greenland Sea, are reported. (au) (77 tabs., 46 ills., 8 refs.)

  10. Environmental radioactivity in the North Atlantic region including the Faroe Islands and Greenland

    International Nuclear Information System (INIS)

    Aarkrog, A.; Chen, Q.J.; Dahlgaard, H.; Hansen, H.; Nielsen, S.P.; Buch, E.; Christensen, G.C.; Holm, E.

    1992-01-01

    Measurements of fallout radioactivity in the North Atlantic region including the Faroe Islands and Greenland are reported. Strontium-90, cesium-137 and cesium-134 were determined in samples of precipitation, sea water, vegetation, various foodstuffs (including milk in the Faroes), and drinking water. Estimates are given of the mean contents of 90 Sr and 137 Cs in human diet in the Faroes and Greenland in 1988 and 1989. 99 Tc data on marine samples, in particular sea water from the Greenland Sea, are reported. (au) (91 taps., 51 ills., 7 refs.)

  11. Environmental radioactivity in the North Atlantic region. The Faroe Islands and Greenland included. 1985

    International Nuclear Information System (INIS)

    Aarkrog, A.; Boelskifte, S.; Dahlgaard, H.; Hansen, H.; Buch, E.; Christensen, G.C.; Hallstadius, L.; Rioseco, J.; Holm, E.

    1987-06-01

    Measurements of fallout radioactivity in the North Atlantic region including the Faroe Islands and Greenland are reported. Strontium-90 and cesium-137 was determined in samples of precipitation, sea water vegetation, various foodstuffs (including milk in the Faroes) and drinking water. Estimates are given of the mean contents of 90 Sr a 137 Cs in human diet in the Faroes and Greenland in 1985. Results from samplings of surface sea water and seaweed in the English Channel, the Fram Strait and along the Norwegian and Greenland coast are reported. Beside radiocesium and 90 Sr some of these samples have also been analysed for tritium, plutonium and americium. Finally technetium-99 data on seaweed and sea water samples collected in the North Atlantic region are presented. 14 refs. (author)

  12. Environmental radioactivity in the North Atlantic region. The Faroe Islands and Greenland included. 1983

    International Nuclear Information System (INIS)

    Aarkrog, A.; Boelskifte, S.; Buch, E.; Christensen, G.C.; Dahlgaard, H.; Hallstadius, L.; Hansen, H.; Holm, E.; Mattsson, S.; Meide, A.

    1984-12-01

    Measurements of fallout radioactivity in the North Atlantic region including the Faroe Islands and Greenland are reported. Strontium-90 and cesium-137 was determined in samples of precipitation, sea water, vegetation, various foodstuffs (including milk in the Faroes) and drinking water. Estimates are given of the mean contents of 90 Sr and 137 Cs in human diet in the Faroes and Greenland in 1983. Results from samplings of surface sea water and seaweed in the Norwegian and Greenland Seas and along the Norwegian and Greenland west coasts are reported. Beside radiocesium and 90 Sr some of these samples have also been anlysed for tritium,plutonium and americium. Finally technetium-99 data on seaweed samples collected in the North Atlantic region since the beginning of the sixties are presented. (author)

  13. Environmental radioactivity in the North Atlantic region. The Faroe Islands and Greenland included. 1984

    International Nuclear Information System (INIS)

    Aarkrog, A.; Boelskifte, S.; Buch, E.; Christensen, G.C.; Dahlgaard, H.; Hallstadius, L.; Hansen, H.; Holm, E.

    1985-12-01

    Measurements of fallout radioactivity in the North Atlantic region including the Faroe Islands and Greenland are reported. Strontium-90 and cesium-137 was determined in samples of precipitation, sea water, vegetation, various foodstuffs (including milk in the Faroes) and drinking water. Estimates are given of the mean contents of 90 Sr and 137 Cs in human diet in the Faroes and Greenland in 1984. Results from samplings of surface sea water and seaweed in the Norwegian and Greenland Seas and along the Norwegian and Greenland west coasts are reported. Beside radiocesium and 90 Sr some of these samples have also been anlysed for tritium, polonium, plutonium and americium. Finally technetium-99 data on seaweed samples collected in the North Atlantic region since the beginning of the sixties are presented. (author)

  14. Cost and benefit including value of life, health and environmental damage measured in time units

    DEFF Research Database (Denmark)

    Ditlevsen, Ove Dalager; Friis-Hansen, Peter

    2009-01-01

    Key elements of the authors' work on money equivalent time allocation to costs and benefits in risk analysis are put together as an entity. This includes the data supported dimensionless analysis of an equilibrium relation between total population work time and gross domestic product leading...... of this societal value over the actual costs, used by the owner for economically optimizing an activity, motivates a simple risk accept criterion suited to be imposed on the owner by the public. An illustration is given concerning allocation of economical means for mitigation of loss of life and health on a ferry...

  15. ESI GIS Data and PDF Maps: Environmental Sensitivity Index including GIS Data and Maps (for the U.S. Shorelines, including Alaska, Hawaii, and Puerto Rico)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Environmental Sensitivity Index (ESI) maps are an integral component in oil-spill contingency planning and assessment. They serve as a source of information in the...

  16. Practical Ranges of Loudness Levels of Various Types of Environmental Noise, Including Traffic Noise, Aircraft Noise, and Industrial Noise

    Directory of Open Access Journals (Sweden)

    Sabine A. Janssen

    2011-05-01

    Full Text Available In environmental noise control one commonly employs the A-weighted sound level as an approximate measure of the effect of noise on people. A measure that is more closely related to direct human perception of noise is the loudness level. At constant A-weighted sound level, the loudness level of a noise signal varies considerably with the shape of the frequency spectrum of the noise signal. In particular the bandwidth of the spectrum has a large effect on the loudness level, due to the effect of critical bands in the human hearing system. The low-frequency content of the spectrum also has an effect on the loudness level. In this note the relation between loudness level and A-weighted sound level is analyzed for various environmental noise spectra, including spectra of traffic noise, aircraft noise, and industrial noise. From loudness levels calculated for these environmental noise spectra, diagrams are constructed that show the relation between loudness level, A‑weighted sound level, and shape of the spectrum. The diagrams show that the upper limits of the loudness level for broadband environmental noise spectra are about 20 to 40 phon higher than the lower limits for narrowband spectra, which correspond to the loudness levels of pure tones. The diagrams are useful for assessing limitations and potential improvements of environmental noise control methods and policy based on A-weighted sound levels.

  17. 78 FR 61843 - Notice of Intent To Prepare an Environmental Impact Statement: Department of the Army Permit...

    Science.gov (United States)

    2013-10-04

    ... resources; essential fish habitat; water quality; cultural resources; geology and soils including... the effects of this proposed action on Essential Fish Habitat per the Magnuson-Stevens Act. The USACE... endangered species and critical habitat. Socioeconomic issues include navigation; induced flooding; land use...

  18. Environmental sensing and combustion diagnostics

    International Nuclear Information System (INIS)

    Santoleri, J.J.

    1991-01-01

    This book contains proceedings of Environmental Sensing and Combustion Diagnostics. Topics covered include: Incineration Systems Applications, Permitting, And Monitoring Overview; Infrared Techniques Applied to Incineration Systems; Continuous Emission Monitors; Analyzers and Sensors for Process Control And Environmental Monitoring

  19. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  20. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  1. Final Environmental Impact Statement. Permit Application by United States Steel Corp., Proposed Lake Front Steel Mill, Conneaut, Ohio. Volume 2.

    Science.gov (United States)

    1979-01-01

    route before reaching Lake Erie; and their flood plains contain the bulk of sefo prune areas in the Pennsylvania Coastal Communities. The U.S...leading variety, while sour cherries rank second. Other fruit crops of importance include cherries, peaches, apples, plums, prunes , and pears. Although...Lakefront Site (Spring, Summer and Fall) Species Common Name Spring Summer Fall Order Marsupialia Didelphis virginiana Virginia opossum X X X Order

  2. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  3. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  4. Environmental Baseline Survey for Proposed Land Use Permit Modification for Expansion of the Dynamic Explosive Test Site (DETS) 9940 Main Complex Parking Lot.

    Energy Technology Data Exchange (ETDEWEB)

    Peek, Dennis W.

    2016-02-01

    The approach was to perform a document search, supplemented by a visual site inspection, to identify potential environmental contamination associated with the property. Factors evaluated included hazardous substances; petroleum products and derivatives; environmental restoration sites; areas of concern; storage tanks; oil/water separators; grease traps; wash racks; waste tanks; pesticides; military munitions/ordnance; medical or bio-hazardous waste; radioactive waste; solid/municipal waste; indoor air quality; groundwater; wastewater treatment, collection, and disposal/discharge; drinking water quality; utilities; asbestos; polychlorinated biphenyls (PCBs); radon; lead-based paint; cultural resources; floodplains; and natural/biological resources.

  5. SUSTAINABLE ENVIRONMENTAL TECHNOLOGIES INCLUDING WATER RECOVERY FOR REUSE FROM TANNERY AND INDUSTRIAL WASTEWATER – INDIAN AND ASIAN SCENARIO

    Directory of Open Access Journals (Sweden)

    Dr. S. RAJAMANI

    2017-05-01

    Full Text Available World leather sector generates 600million m3 of wastewater per annum. The Asian tanneries contributes more than 350 million m3 of wastewater from the process of 8 to 10 millions tons of hides and skins. Environmental challenges due to depletion of quality water resources and increase in salinity, it has become necessary to control Total Dissolved Solids (TDS in the treated effluent with water recovery wherever feasible. Adoption of special membrane system has been engineered in many individual and Common Effluent Treatment Plants (CETPs in India, China and other leather producing countries. The sustainability of saline reject management is one of the major challenges. Conventional tannery wastewater treatment systems include physiochemical and biological treatment to reduce Chromium, BOD, COD and Suspended Solids. To tackle treated effluent with TDS in the rage of 10000 to 30000mg/l, multiple stage high pressure membrane units have been designed and implemented for recovery of water. To reduce the chemical usage and sludge generation in the tertiary treatment, Membrane Bio-Reactor (MBR has been adopted which replace secondary clarifier and sophisticated tertiary treatment units such as Reactive Clarifier, Ultra-filtration (UF, etc. Commercial scale high-tech membrane systems have been implemented in many locations for the capacities ranging from 500 to 10000m3/day. Recent applied R&D on the environmental protection techniques with focus on water-recovery for reuse, salt recovery, marine disposal of saline reject with proper bio-control system, etc. are dealt in this novel technical paper.

  6. 45 CFR 671.6 - Applications for permits.

    Science.gov (United States)

    2010-10-01

    ... such releases; arrangements for waste management, including, without limitation, plans for waste...) The desired effective date and duration of the permit; and (5) The following certification: “I certify... (including duration). The notice shall invite the submission by interested parties, the Environmental...

  7. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  8. 40 CFR 239.4 - Narrative description of state permit program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Narrative description of state permit program. 239.4 Section 239.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Narrative description of state permit program. The description of a state's program must include: (a) An...

  9. Environmental Sensitivity Index (ESI) Atlas: Central California (Including Monterey Bay Sanctuary), maps and geographic information systems data (NODC Accession 0013176)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Environmental Sensitivity Index (ESI) maps have been developed for the coastal areas of Central California from Point Conception to Point Reyes National Seashore....

  10. ESI PDF Maps: Environmental Sensitivity Index PDF Maps (for the U.S. Shorelines, including Alaska, Hawaii, and Puerto Rico)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Environmental Sensitivity Index (ESI) maps are an integral component in oil-spill contingency planning and assessment. They serve as a source of information in the...

  11. Strategic environmental assessment (SEA) as a means to include environmental knowledge in decision making in the case of an aluminium reduction plant in Greenland

    DEFF Research Database (Denmark)

    Hansen, Anne Merrild

    2011-01-01

    The purpose and means of strategic environmental assessment (SEA) can vary depending on the case investigated and interests of actors involved. Based on the objective for the SEA of a proposed aluminium reduction plant (ARP) in Greenland, this paper evaluates the SEA’s effectiveness in securing...... environmental knowledge in a decision-making process. It is concluded that the SEA secured inclusion of environmental knowledge in three out of four key decision arenas, which determined the direction and outcome of the process. The results from the SEA did not oppose the recommendations based on the economic...... assessments. As there was no conflict between economic and environmental recommendations, and hence no visible proof of SEA’s influence on the outcome of the decision, it is discussed whether environmental knowledge, in this decision making process, equals influence. The investigation was carried out...

  12. Practical ranges of loudness levels of various types of environmental noise, including traffic noise, aircraft noise, and industrial noise

    NARCIS (Netherlands)

    Salomons, E.M.; Janssen, S.A.

    2011-01-01

    In environmental noise control one commonly employs the A-weighted sound level as an approximate measure of the effect of noise on people. A measure that is more closely related to direct human perception of noise is the loudness level. At constant A-weighted sound level, the loudness level of a

  13. Challenges to IPPC-B permitting at LGU in Macedonia

    International Nuclear Information System (INIS)

    Nikolov, Marjan

    2006-01-01

    The debate will soon turn to discussion of the arrangements between the environmental protection administration (both central and local), the LGU and ZELS and businesses in order to implement the Law on environment. Of special importance will be development of environment for IPPC-B permitting at the LGU including all stakeholders. The Ministry of Environment and Physical Planning-MEPP must clarify the interface between the responsibilities of the Environmental Protection Administration and those of the LGU.

  14. "Got rats?" Global environmental costs of thirst for milk include acute biodiversity impacts linked to dairy feed production.

    Science.gov (United States)

    Luque-Larena, Juan J; Mougeot, François; Arroyo, Beatriz; Lambin, Xavier

    2018-07-01

    Rodents damaging alfalfa crops typically destined for export to booming Eastern markets often cause economical losses to farmers, but management interventions attempting to control rodents (i.e., use of rodenticides) are themselves damaging to biodiversity. These damages resonate beyond dairy feed producing regions through animal migration and are an overlooked part of the transferred environmental burden caused by a growing thirst for milk in China and elsewhere. © 2018 John Wiley & Sons Ltd.

  15. Variations in Carabidae assemblages across the farmland habitats in relation to selected environmental variables including soil properties

    Directory of Open Access Journals (Sweden)

    Beáta Baranová

    2018-03-01

    Full Text Available The variations in ground beetles (Coleoptera: Carabidae assemblages across the three types of farmland habitats, arable land, meadows and woody vegetation were studied in relation to vegetation cover structure, intensity of agrotechnical interventions and selected soil properties. Material was pitfall trapped in 2010 and 2011 on twelve sites of the agricultural landscape in the Prešov town and its near vicinity, Eastern Slovakia. A total of 14,763 ground beetle individuals were entrapped. Material collection resulted into 92 Carabidae species, with the following six species dominating: Poecilus cupreus, Pterostichus melanarius, Pseudoophonus rufipes, Brachinus crepitans, Anchomenus dorsalis and Poecilus versicolor. Studied habitats differed significantly in the number of entrapped individuals, activity abundance as well as representation of the carabids according to their habitat preferences and ability to fly. However, no significant distinction was observed in the diversity, evenness neither dominance. The most significant environmental variables affecting Carabidae assemblages species variability were soil moisture and herb layer 0-20 cm. Another best variables selected by the forward selection were intensity of agrotechnical interventions, humus content and shrub vegetation. The other from selected soil properties seem to have just secondary meaning for the adult carabids. Environmental variables have the strongest effect on the habitat specialists, whereas ground beetles without special requirements to the habitat quality seem to be affected by the studied environmental variables just little.

  16. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  17. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  18. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  19. Environmental externalities: Applying the concept to Asian coal-based power generation. [Includes external environmental and societal costs and methods of evaluating them

    Energy Technology Data Exchange (ETDEWEB)

    Szpunar, C.B.; Gillette, J.L.

    1993-03-01

    This report examines the concept of environmental externality. It discusses various factors -- the atmospheric transformations, relationship of point-source emissions to ambient air quality, dose-response relationships, applicable cause-and-effect principles, and risk and valuation research -- that are considered by a number of state utilities when they apply the environmental externality concept to energy resource planning. It describes a methodology developed by Argonne National Laboratory for general use in resource planning, in combination with traditional methods that consider the cost of electricity production. Finally, it shows how the methodology can be applied in Indonesia, Thailand, and Taiwan to potential coal-fired power plant projects that will make use of clean coal technologies.

  20. Emission and costs up to and including 2030 for the current environmental policy. Background information for the National Environmental Outlook 5

    International Nuclear Information System (INIS)

    Van Wee, G.P.; Kuijpers-Linde, M.A.J.; Van Gerwen, O.J.

    2001-03-01

    Every four years the Dutch National Institute of Public Health and the Environment (RIVM) publishes an Environmental Outlook in preparation for the National Environmental Policy Plan (NEPP). The fifth National Environmental Outlook (NEOS) describes developments in the quality of the environment in the Netherlands for 2000-2030 against a background of developments on the European and global scales. The two macro-economic scenarios of the Netherlands Bureau for Economic and Policy Analysis (CPB) used are the European Coordination (EC) scenario and the Global Competition scenario (GC). Consequences for public health, nature and the human physical environment are also indicated. 'Fixed policy' scenarios are used in the Environmental Outlook for the Netherlands. In 'fixed policy' scenarios it is assumed that all policy measures agreed on by the year 2000 will be implemented, but no new measures taken. In this way the Outlook offers baseline scenarios that can be compared with targets and objectives to facilitate the development of new policy. The Fifth National Environmental Outlook was realised with the assistance of many other Dutch research institutes. This background document to NEOS presents estimated levels of energy use, emissions and costs of environmental measures for the 1995-2020 period. The main conclusions are: The environmental problems most difficult to tackle are climate change and noise nuisance. These problems are highly related to energy use and transportation; The policy as presented in the 'Uitvoeringsnota Klimaatbeleid', a document describing the Dutch Kyoto-related climate policy, results in a reduction of greenhouse gases of 15 Mton CO2 equivalents (GS scenario) with respect to the pre-Kyoto policy in 2010. To meet the Kyoto agreements a further reduction of approximately 45 Mton CO2 equivalents is needed. If policies in the 'Uitvoeringsnota Klimaatbeleid' are further instrumentalised and made concrete, an extra reduction of 10 Mton is possible

  1. Environmental assessment of bioenergy technologies application in Russia, including their impact on the balance of greenhouse gases

    Science.gov (United States)

    Andreeva, Irina; Vasenev, Ivan

    2017-04-01

    In recent years, Russia adopted a policy towards increasing of the share of renewable energy in total amount of used energy, albeit with some delay comparing to the EU countries and the USA. It was expected that the use of biofuels over time will reduce significantly the dependency of Russian economy on fossil fuels, increase its competitiveness, and increase Russian contribution to the prevention of global climate changes. Russia has significant bio-energy potential and resources which are characterized by great diversity due to the large extent of the territory, which require systematic studies and environmental assessment of used bio-energy technologies. Results of research carried at the Laboratory of agroecological monitoring, modeling and prediction of ecosystems RSAU-MTAA demonstrated significant differences in the assessment of the environmental, economic and social effects of biofuel production and use, depending on the species of bio-energy crops, regional soil-ecological and agro-climatic characteristics, applied farming systems and production processes. The total area of temporarily unused and fallow land, which could be allocated to the active agricultural use in Russia, according to various estimates, ranges from 20 to 33 million hectares, which removes the problem, typical of most European countries, of adverse agro-ecological changes in land use connected with the expansion of bio-energy crops cultivation. However, the expansion of biofuel production through the use of fallow land and conversion of natural lands has as a consequence the problem of greenhouse gas emissions due to land use changes, which, according to FAO, could be even higher than CO2 emission from fossil fuels for some of bio-energy raw materials and production systems. Assessment of the total impacts of biofuels on greenhouse gas emissions in the Russian conditions should be based on regionally adapted calculations of flows throughout the entire life cycle of production, taking

  2. Antimicrobial susceptibility and antibiotic resistance gene transfer analysis of foodborne, clinical, and environmental Listeria spp. isolates including Listeria monocytogenes.

    Science.gov (United States)

    Bertsch, David; Muelli, Mirjam; Weller, Monika; Uruty, Anaïs; Lacroix, Christophe; Meile, Leo

    2014-02-01

    The aims of this study were to assess antibiotic resistance pheno- and genotypes in foodborne, clinical, and environmental Listeria isolates, as well as to elucidate the horizontal gene transfer potential of detected resistance genes. A small fraction of in total 524 Listeria spp. isolates (3.1%) displayed acquired antibiotic resistance mainly to tetracycline (n = 11), but also to clindamycin (n = 4) and trimethoprim (n = 3), which was genotypically confirmed. In two cases, a tetracycline resistance phenotype was observed together with a trimethoprim resistance phenotype, namely in a clinical L. monocytogenes strain and in a foodborne L. innocua isolate. Depending on the applied guidelines, a differing number of isolates (n = 2 or n = 20) showed values for ampicillin that are on the edge between intermediate susceptibility and resistance. Transferability of the antibiotic resistance genes from the Listeria donors, elucidated in vitro by filter matings, was demonstrated for genes located on transposons of the Tn916 family and for an unknown clindamycin resistance determinant. Transfer rates of up to 10(-5) transconjugants per donor were obtained with a L. monocytogenes recipient and up to 10(-7) with an Enterococcus faecalis recipient, respectively. Although the prevalence of acquired antibiotic resistance in Listeria isolates from this study was rather low, the transferability of these resistances enables further spread in the future. This endorses the importance of surveillance of L. monocytogenes and other Listeria spp. in terms of antibiotic susceptibility. © 2014 The Authors. MicrobiologyOpen published by John Wiley & Sons Ltd.

  3. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  4. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  5. A comprehensive economic evaluation of integrated desalination systems using fossil fuelled and nuclear energies and including their environmental costs

    International Nuclear Information System (INIS)

    Nisan, S.; Benzarti, N.

    2008-01-01

    Seawater desalination is now widely accepted as an attractive alternative source of freshwater for domestic and industrial uses. Despite the considerable progress made in the relevant technologies desalination, however, remains an energy intensive process in which the energy cost is the paramount factor. This Study is a first of a kind in that we have integrated the environmental costs into the power and desalination costs. The study has focused on the seawater desalination cost evaluation of the following systems. It is supposed that they will be operating in the co-generation mode (Simultaneous production of electrical power and desalted water) in 2015: Fossil fuelled based systems such as the coal and oil fired plants and the gas turbine combined cycle plant, coupled to MED, and RO; Pressurised water reactors such as the PWR-900 and the AP-600, coupled to MED, and RO; High temperature reactors such as the GT-MHR, the PBMR, coupled to MED, with the utilisation of virtually free waste-heat provided by these reactors. The study is made in real site-specific conditions of a site In Southern Europe. Sensitivity studies for different parameters such as the fossil fuel prices, interest and discount rates, power costs etc., have also been undertaken. The results obtained are then used to evaluate the financial interest of selected integrated desalination systems in terms of a detailed cash flow analysis, providing the net present values, pay back periods and the internal rate of returns. Analysis of the results shows that among the fossil fuelled systems the power and desalination costs by circulating fluidized bed coal fired plant would be the lowest with current coal prices. Those by oil fired plants would be highest. In all cases, integrated nuclear energy systems would lead to considerably lower power and water costs than the corresponding coal based systems. When external costs for different energies are internalized in power and water costs, the relative cost

  6. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  7. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  8. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  9. Adult Mouse DRG Explant and Dissociated Cell Models to Investigate Neuroplasticity and Responses to Environmental Insults Including Viral Infection.

    Science.gov (United States)

    Fornaro, Michele; Sharthiya, Harsh; Tiwari, Vaibhav

    2018-03-09

    This protocol describes an ex vivo model of mouse-derived dorsal root ganglia (DRG) explant and in vitro DRG-derived co-culture of dissociated sensory neurons and glial satellite cells. These are useful and versatile models to investigate a variety of biological responses associated with physiological and pathological conditions of the peripheral nervous system (PNS) ranging from neuron-glial interaction, neuroplasticity, neuroinflammation, and viral infection. The usage of DRG explant is scientifically advantageous compared to simplistic single cells models for multiple reasons. For instance, as an organotypic culture, the DRG explant allows ex vivo transfer of an entire neuronal network including the extracellular microenvironment that play a significant role in all the neuronal and glial functions. Further, DRG explants can also be maintained ex vivo for several days and the culture conditions can be perturbed as desired. In addition, the harvested DRG can be further dissociated into an in vitro co-culture of primary sensory neurons and satellite glial cells to investigate neuronal-glial interaction, neuritogenesis, axonal cone interaction with the extracellular microenvironment, and more general, any aspect associated with the neuronal metabolism. Therefore, the DRG-explant system offers a great deal of flexibility to study a wide array of events related to biological, physiological, and pathological conditions in a cost-effective manner.

  10. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  11. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  12. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  13. 1995 Site environmental report Sandia National Laboratories, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    Shyr, L.J.; Duncan, D.; Sanchez, R.

    1996-09-01

    This 1995 report contains data from routine radiological and non-radiological environmental monitoring activities. Summaries of significant environmental compliance programs in progress, such as National Environmental Policy Act documentation, environmental permits, environmental restoration and various waste management programs at Sandia National Laboratories in Albuquerque, New Mexico, are included

  14. 1995 Site environmental report Sandia National Laboratories, Albuquerque, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Shyr, L.J.; Duncan, D. [eds.; Sanchez, R.

    1996-09-01

    This 1995 report contains data from routine radiological and non-radiological environmental monitoring activities. Summaries of significant environmental compliance programs in progress, such as National Environmental Policy Act documentation, environmental permits, environmental restoration and various waste management programs at Sandia National Laboratories in Albuquerque, New Mexico, are included.

  15. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  16. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993

  17. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  18. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  19. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  20. Genotypic and phenotypic diversity of Ralstonia pickettii and Ralstonia insidiosa isolates from clinical and environmental sources including High-purity Water.

    LENUS (Irish Health Repository)

    Ryan, Michael P

    2011-08-30

    Abstract Background Ralstonia pickettii is a nosocomial infectious agent and a significant industrial contaminant. It has been found in many different environments including clinical situations, soil and industrial High Purity Water. This study compares the phenotypic and genotypic diversity of a selection of strains of Ralstonia collected from a variety of sources. Results Ralstonia isolates (fifty-nine) from clinical, industrial and environmental origins were compared genotypically using i) Species-specific-PCR, ii) PCR and sequencing of the 16S-23S rRNA Interspatial region (ISR) iii) the fliC gene genes, iv) RAPD and BOX-PCR and v) phenotypically using biochemical testing. The species specific-PCR identified fifteen out of fifty-nine designated R. pickettii isolates as actually being the closely related species R. insidiosa. PCR-ribotyping of the 16S-23S rRNA ISR indicated few major differences between the isolates. Analysis of all isolates demonstrated different banding patterns for both the RAPD and BOX primers however these were found not to vary significantly. Conclusions R. pickettii species isolated from wide geographic and environmental sources appear to be reasonably homogenous based on genotypic and phenotypic characteristics. R. insidiosa can at present only be distinguished from R. pickettii using species specific PCR. R. pickettii and R. insidiosa isolates do not differ significantly phenotypically or genotypically based on environmental or geographical origin.

  1. Kentucky Department for Natural Resources and Environmental Protection permit application for air contaminant source: SRC-I demonstration plant, Newman, Kentucky. Supplement I. [Additional information on 38 items requested by KY/DNREP

    Energy Technology Data Exchange (ETDEWEB)

    Pearson, Jr., John F.

    1981-02-13

    In response to a letter from KY/DNREP, January 19, 1981, ICRC and DOE have prepared the enclosed supplement to the Kentucky Department for Natural Resources and Environmental Protection Permit Application for Air Contaminant Source for the SRC-I Demonstration Plant. Each of the 38 comments contained in the letter has been addressed in accordance with the discussions held in Frankfort on January 28, 1981, among representatives of KY/DNREP, EPA Region IV, US DOE, and ICRC. The questions raised involve requests for detailed information on the performance and reliability of proprietary equipment, back-up methods, monitoring plans for various pollutants, composition of wastes to flares, emissions estimates from particular operations, origin of baseline information, mathematical models, storage tanks, dusts, etc. (LTN)

  2. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  3. Environmental Impact Assessment of a School Building in Iceland Using LCA-Including the Effect of Long Distance Transport of Materials

    Directory of Open Access Journals (Sweden)

    Nargessadat Emami

    2016-11-01

    Full Text Available Buildings are the key components of urban areas and society as a complex system. A life cycle assessment was applied to estimate the environmental impacts of the resources applied in the building envelope, floor slabs, and interior walls of the Vættaskóli-Engi building in Reykjavik, Iceland. The scope of this study included four modules of extraction and transportation of raw material to the manufacturing site, production of the construction materials, and transport to the building site, as described in the standard EN 15804. The total environmental effects of the school building in terms of global warming potential, ozone depletion potential, human toxicity, acidification, and eutrophication were calculated. The total global warming potential impact was equal to 255 kg of CO2 eq/sqm, which was low compared to previous studies and was due to the limited system boundary of the current study. The effect of long-distance overseas transport of materials was noticeable in terms of acidification (25% and eutrophication (31% while it was negligible in other impact groups. The results also concluded that producing the cement in Iceland caused less environmental impact in all five impact categories compared to the case in which the cement was imported from Germany. The major contribution of this work is that the environmental impacts of different plans for domestic production or import of construction materials to Iceland can be precisely assessed in order to identify effective measures to move towards a sustainable built environment in Iceland, and also to provide consistent insights for stakeholders.

  4. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  5. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  6. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  7. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  8. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  9. NPDES permits and water analyses

    International Nuclear Information System (INIS)

    Pojasek, R.B.

    1975-01-01

    Provisions of the Federal Water Pollution Control Act, as amended by P. L. 92-500, including an explanation of the National Pollutant Discharge Elimination System (NPDES), and EPA's criteria for the analysis of pollutants are discussed. The need for a revision of current restrictive variance procedures is pointed out. References for the comparison of analytical methods for water pollutants under permits, including radioactive parameters, are tabulated. (U.S.)

  10. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... engineering, social, economic and environmental benefit and impacts. (e) The HA shall consider hydraulic... permit. (a) The USCG has the responsibility (1) to determine whether a USCG permit is required for the... the USCG to be involved throughout the environmental review process in accordance with 23 CFR part 771...

  11. Environmental toxin acrolein alters levels of endogenous lipids, including TRP agonists: A potential mechanism for headache driven by TRPA1 activation

    Directory of Open Access Journals (Sweden)

    Emma Leishman

    2017-01-01

    Full Text Available Exposure to airborne toxins can trigger headaches, but the mechanisms are not well understood. Some environmental toxins, such as acrolein, activate transient receptor potential ankyrin 1 (TRPA1, a receptor involved in pain sensation that is highly expressed in the trigeminovascular system. It has been shown in rat models that repeated exposure to acrolein induces trigeminovascular sensitization to both TRPA1 and TRP vanilloid 1 (TRPV1 agonists, a phenomenon linked to headache. In this study, we test the hypothesis that the sensitization of trigeminovascular responses in rats after acrolein exposure via inhalation is associated with changes in levels of endogenous lipids, including TRPV1 agonists, in the trigeminal ganglia, trigeminal nucleus, and cerebellum. Lipidomics analysis of 80 lipids was performed on each tissue after acute acrolein, chronic acrolein, or room air control. Both acute and chronic acrolein exposure drove widespread alterations in lipid levels. After chronic acrolein exposure, levels of all 6 N-acyl ethanolamines in the screening library, including the endogenous cannabinoid and TRPV1 agonist, N-arachidonoyl ethanolamine, were elevated in trigeminal tissue and in the cerebellum. This increase in TRPV1 ligands by acrolein exposure may indicate further downstream signaling, in that we also show here that a combination of these TRPV1 endogenous agonists increases the potency of the individual ligands in TRPV1-HEK cells. In addition to these TRPV1 agonists, 3 TRPV3 antagonists, 4 TRPV4 agonists, and 25 orphan lipids were up and down regulated after acrolein exposure. These data support the hypothesis that lipid signaling may represent a mechanism by which repeated exposure to the TRPA1 agonist and environmental toxin, acrolein, drives trigeminovascular sensitization. Keywords: Lipidomics, Endogenous cannabinoid, TRPA1, TRPV1, Lipoamine, Acrolein, Migraine

  12. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  13. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  14. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  15. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  16. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  17. Reaching a consensus. "Global issues, including environmental ones, are things to be solved with the cooperation of developed and developing countries".

    Science.gov (United States)

    Hiraiwa, G

    1998-01-01

    This article is an excerpt of a speech given by the Honorary Chairman of the Japan Federation of Economic Organizations at the Common Agenda Roundtable meeting in February 1996. The Common Agenda is a bilateral cooperative effort between the US and Japan, which was established in July 1993, to address common concerns through a public-private partnership. The roundtable membership includes about 50 persons who have a range of expertise and professions including scholars, journalists, civil society organizations, and businesses. There have been about 10 Roundtable meetings over the past 2 years. Each meeting includes a report by the deputy minister of foreign affairs on progress made under the Common Agenda. Members exchange views in lively debate and meet with senior government officials. The US-Japan Partnerships on Environmental Awareness and Education were held in April 1997, in Tokyo. The February 1998 meeting with 60 participants was held in Washington, DC, on the Global Context of Civil Society. The workshops focused on the ways that cooperation with civil society organizations, businesses, and governments can be reinforced in the areas of population, health, and the environment. The workshop resulted in effective proposals. This speaker urges that the US and Japan reach as many agreements as possible; that some of the agreements result quickly in Common Agenda projects; and that each country will produce a private sector organization to support the Common Agenda. This effort is moving in new directions and offers a consensus of concerns for the environment.

  18. 77 FR 55168 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Permits for Major...

    Science.gov (United States)

    2012-09-07

    ... Pollution Control Board or by the permittee. Actions to combine permit terms and conditions must include a... submitted by VADEQ for approval into the SIP were adopted by the State Air Pollution Control Board on June 8... prompt and appropriate measures to remedy the violations. Virginia's Voluntary Environmental Assessment...

  19. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  20. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  1. Onshore permitting systems analysis for coal, oil, gas, geothermal and oil shale leases. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    The magnitude and complexity of permit processes raises a question as to their impact on the rate and scope of industrial development activity. One particular area where this issue is of concern is in new energy extraction and development activities. The initiation of new energy projects has been a national priority for several years. But, energy projects, because of their potential for creating land disturbances, are subject to many environmental and other regulations. Because of this, the permitting required of energy resource developers is extensive. Within the energy field, a major portion of development activities occurs on federal lands. This is particularly true in the Rocky Mountain states and Alaska where the principal landholder is the federal government. The permitting requirements for federal lands' development differ from those for private lands. This report assesses the impact of permitting processes for energy resource development on federal lands. The permitting processes covered include all of the major environmental, land-use, and safety permits required by agencies of federal and state governments. The lands covered include all federal lands, with emphasis on eight states with major development activities.

  2. Environmental guidelines for reuse of ash in civil engineering applications - including criteria for Sb and As; Miljoeriktlinjer foer askanvaendning i anlaeggningsbyggande - inklusive haltkriterier foer Sb och As

    Energy Technology Data Exchange (ETDEWEB)

    Bendz, David; Wik, Ola (Swedish Geotechnical Inst., Linkoeping (Sweden)); Jones, Celia; Pettersson, Michael; Elert, Mark (Kemakta, Stockholm (Sweden))

    2009-07-15

    exposure scenarios including exposure pathways and points of compliance. Risk evaluation becomes an issue of comparing the estimated (-modeled) increased concentrations at specified target points with general human and environmental toxicological criteria. Guidelines have been calculated for two different types of constructions, with or without an impermeable (asphalt-) pavement that prevents rain water from infiltrating into the road. Also the possible exposure of intruding ground water has been taken into account. A set of ashes, for which data on total content and leachability was available in the ALLASKA and MALTE database, have been classified according to three categories of applications/situations. The results show that due to lack of data it could not be assessed whether naphthalene, bens(a)pyren and selen in ashes imply an insignificant risk or not. Cadmium, copper, chromium, mercury, molybdenum, nickel and zinc generally shows a large margin to the calculated guidelines for total content and leachability for most ashes. Thus, ashes in constructions constitute an acceptable risk with respect to these elements. Antimony and lead in ashes fall above the guideline values for leaching in some cases. The total content of arsenic in many ashes exceeds the guideline values when used in an unpaved construction even when taking the oral bioavailabity of arsenic in ashes in consideration. To a lesser extent this also holds for total content of lead. Accordingly, it can not be excluded that the reuse of some ashes in some applications may imply a certain risk. Spreading as dust, deposition on vegetables and the subsequent intake has reveled itself as an important exposure pathway. Little data, theory and models are available on dust generation and transport, the calculations made here are rough and conservative. Also, guidelines for the ash construction left in place in the post use phase are difficult to determine. The health risk associated with intake of vegetables and

  3. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  4. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  5. Technical support document: Energy efficiency standards for consumer products: Refrigerators, refrigerator-freezers, and freezers including draft environmental assessment, regulatory impact analysis

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Energy Policy and Conservation Act (P.L. 94-163), as amended by the National Appliance Energy Conservation Act of 1987 (P.L. 100-12) and by the National Appliance Energy Conservation Amendments of 1988 (P.L. 100-357), and by the Energy Policy Act of 1992 (P.L. 102-486), provides energy conservation standards for 12 of the 13 types of consumer products` covered by the Act, and authorizes the Secretary of Energy to prescribe amended or new energy standards for each type (or class) of covered product. The assessment of the proposed standards for refrigerators, refrigerator-freezers, and freezers presented in this document is designed to evaluate their economic impacts according to the criteria in the Act. It includes an engineering analysis of the cost and performance of design options to improve the efficiency of the products; forecasts of the number and average efficiency of products sold, the amount of energy the products will consume, and their prices and operating expenses; a determination of change in investment, revenues, and costs to manufacturers of the products; a calculation of the costs and benefits to consumers, electric utilities, and the nation as a whole; and an assessment of the environmental impacts of the proposed standards.

  6. Technical support document: Energy conservation standards for consumer products: Dishwashers, clothes washers, and clothes dryers including: Environmental impacts; regulatory impact analysis

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    The Energy Policy and Conservation Act as amended (P.L. 94-163), establishes energy conservation standards for 12 of the 13 types of consumer products specifically covered by the Act. The legislation requires the Department of Energy (DOE) to consider new or amended standards for these and other types of products at specified times. This Technical Support Document presents the methodology, data and results from the analysis of the energy and economic impacts of standards on dishwashers, clothes washers, and clothes dryers. The economic impact analysis is performed in five major areas: An Engineering Analysis, which establishes technical feasibility and product attributes including costs of design options to improve appliance efficiency. A Consumer Analysis at two levels: national aggregate impacts, and impacts on individuals. The national aggregate impacts include forecasts of appliance sales, efficiencies, energy use, and consumer expenditures. The individual impacts are analyzed by Life-Cycle Cost (LCC), Payback Periods, and Cost of Conserved Energy (CCE), which evaluate the savings in operating expenses relative to increases in purchase price; A Manufacturer Analysis, which provides an estimate of manufacturers' response to the proposed standards. Their response is quantified by changes in several measures of financial performance for a firm. An Industry Impact Analysis shows financial and competitive impacts on the appliance industry. A Utility Analysis that measures the impacts of the altered energy-consumption patterns on electric utilities. A Environmental Effects analysis, which estimates changes in emissions of carbon dioxide, sulfur oxides, and nitrogen oxides, due to reduced energy consumption in the home and at the power plant. A Regulatory Impact Analysis collects the results of all the analyses into the net benefits and costs from a national perspective. 47 figs., 171 tabs. (JF)

  7. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  8. Gulf of Mexico Shrimp Permit Gear Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual vessel gear characterization of permit holders shrimp vessel. Data includes net type, TED type, BRD type, etc.

  9. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  10. An economic analysis of tradeable emission permits for sulphur dioxide emissions in Europe

    International Nuclear Information System (INIS)

    Kruitwagen, S.

    1996-01-01

    The central theme of this thesis is the analysis of the applicability of tradeable emission permits for cost-effective SO2 reduction in Europe. First, an economic theoretical background is presented based on a literature study. Second, integrated assessment models are presented and compared. One of these models is selected for simulation. Third, a new permit trading systems is developed and analysed by detailed simulations of trading schemes, including their economic and environmental implications. Chapter 2 discusses some general economic aspects of pollution control. Attention is paid to the cost effectiveness of pollution control, to the international dimension of acid rain policy and to the need for cooperation. Some general game theoretic concepts are reviewed. Also attention is paid to the alternative policy instruments for emission control, focusing on tradeable emission permits. The theory of tradeable emission permits is elaborated in Chapter 3. Permit trading for pollutants that are non-uniformly mixing is thoroughly discussed and illustrated by some empirical studies. After discussing both emission permit and deposition permit trading systems, alternative systems of tradeable permits for this kind of pollutants are examined. Two main aspects in examining permit trading systems concern (1) the kind of trading process assumed, involving the distinction between simultaneous multilateral permit trading versus bilateral sequential permit trading, and (2) the initial distribution of emission permits. The thorough discussion on tradeable permits contributes to a better understanding of this policy instrument and sheds light on the implications of permit trading for non-uniformly mixing pollutants. The findings of this chapter indicate that a new permit trading system has to be developed. Chapter 4 describes and compares integrated assessment models for simulation of acid rain control. First, three integrated assessment models for the European acid rain problem

  11. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  12. Savannah River Site Environmental report for 2012

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Michael; Jannik, Timothy; Cauthen, Kim; Bryant, Tracy; Coward, Lori; Eddy, Teresa; Vangelas, Karen; O' Quinn, Sadika; Meyer, Amy; Ackerman, Jana D.; Adams, John; Fanning, Greta; Thompson, Martha; Farfan, Eduardo B.; Dixon, Kenneth L.; Kemmerlin, Robert; Millings, Ted; Maxwell, Sherrod; Blas, Susan; Looney, Brian; Jackson, Dennis; Paller, Michael; Wabbersen, William

    2013-09-12

    This report is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 2012 - including the Site's performance against applicable standards and requirements. Details are provided on major programs such as the Environmental Management System (EMS) and permit compliance.

  13. A Regional Multi-permit Market for Ecosystem Services

    Science.gov (United States)

    Bernknopf, R.; Amos, P.; Zhang, E.

    2014-12-01

    Regional cap and trade programs have been in operation since the 1970's to reduce environmental externalities (NOx and SOx emissions) and have been shown to be beneficial. Air quality and water quality limits are enforced through numerous Federal and State laws and regulations while local communities are seeking ways to protect regional green infrastructure and their ecosystems services. Why not combine them in a market approach to reduce many environmental externalities simultaneously? In a multi-permit market program reforestation (land offsets) as part of a nutrient or carbon sequestration trading program would provide a means to reduce agrochemical discharges into streams, rivers, and groundwater. Land conversions also improve the quality and quantity of other environmental externalities such as air pollution. Collocated nonmarket ecosystem services have societal benefits that can expand the crediting system into a multi-permit trading program. At a regional scale it is possible to combine regulation of water quality, air emissions and quality, and habitat conservation and restoration into one program. This research is about the economic feasibility of a Philadelphia regional multi-permit (cap and trade) program for ecosystem services. Instead of establishing individual markets for ecosystem services, the assumption of the spatial portfolio approach is that it is based on the interdependence of ecosystem functions so that market credits encompasses a range of ecosystem services. Using an existing example the components of the approach are described in terms of scenarios of land portfolios and the calculation of expected return on investment and risk. An experiment in the Schuylkill Watershed will be described for ecosystem services such as nutrients in water and populations of bird species along with Green House Gases. The Philadelphia regional market includes the urban - nonurban economic and environmental interactions and impacts.

  14. 1993 site environmental report Tonopah Test Range, Tonopah, Nevada

    International Nuclear Information System (INIS)

    Culp, T.; Howard, D.; McClellan, Y.

    1994-10-01

    This report summarizes the environmental surveillance activities conducted by Sandia National Laboratories, the US Environmental Protection Agency, and Reynolds Electrical and Engineering Company for the Tonopah Test Range operated by Sandia National Laboratories. Sandia National Laboratories' responsibility for environmental monitoring results extend to those activities performed by Sandia National Laboratories or under its direction. Results from other environmental monitoring activities are included to provide a measure of completeness in reporting. Other environmental compliance programs such as the National Environmental Policy Act of 1969, environmental permits, and environmental restoration and waste management programs are also included in this report, prepared for the US Department of Energy in compliance with DOE Order 5400.1

  15. 1994 site environmental report, Tonopah Test Range, Tonopah, Nevada

    International Nuclear Information System (INIS)

    Culp, T.; Forston, W.

    1995-09-01

    This report summarizes the environmental surveillance activities conducted by Sandia National Laboratories, the US Environmental Protection Agency, and Kirk-Mayer, Inc., for the Tonopah Test Range operated by Sandia National Laboratories. Sandia National Laboratories' responsibility for environmental surveillance results extends to those activities performed by Sandia National Laboratories or under its direction. Results from other environmental surveillance activities are included to provide a measure of completeness in reporting. Other environmental compliance programs such as the National Environmental Policy Act of 1969, environmental permits, and environmental restoration and waste management programs are also included in this report, prepared for the US Department of Energy (DOE) in compliance with DOE Order 5400. 1

  16. Final environmental statement for selection of the preferred closed cycle cooling system at Indian Point Unit No. 3, Docket No. 50-286

    International Nuclear Information System (INIS)

    1979-12-01

    The environmental statement includes information concerning the alternative closed cycle cooling systems; schedule and permits; environmental impacts of feasible alternative closed cycle cooling systems; socio-economic impact of closed cycle cooling systems; and evaluation of proposed action

  17. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  18. 616 Nonradioactive Dangerous Waste Storage Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-10-01

    The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this storage unit, including the Part A included with this document, is provided at the beginning of the Part A Section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings. The 616 Nonradioactive Dangerous Waste Storage Facility Dangerous Waste Permit Application (Revision 0) was submitted to the Washington State Department of Ecology and the US Environmental Protection Agency on July 31, 1989. Revision 1, addressing Washington State Department of Ecology review comments made on Revision 0 dated November 21, 1989, and March 23, 1990, was submitted on June 22, 1990. This submittal, Revision 2, addresses Washington State Department of Ecology review comments made on Revision 1, dated June 22, 1990, August 30, 1990, December 18, 1990, and July 8, 1991

  19. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  20. Permits for coal-fired power plants under scrutiny

    International Nuclear Information System (INIS)

    Hoekstra, B.

    2011-01-01

    The attorney-general of the European Court of Justice offered advice to the European Judge on the prejudicial questions of the Department of Administrative Law of the Council of State in the framework of appeal cases against environmental permits of three planned power plants in the Netherlands. The advice may have large consequences for these permits. [nl

  1. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  2. 40 CFR 76.9 - Permit application and compliance plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Permit application and compliance plans. 76.9 Section 76.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.9 Permit application and...

  3. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  4. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  5. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  6. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  7. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  8. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  9. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  10. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  11. EPA Office of Water (OW): Pollutant Discharge Permit Status

    Data.gov (United States)

    U.S. Environmental Protection Agency — U.S. States (Generalized) represents the 50 states and the District of Columbia of the United States joined with data from the NPDES Permit Backlog Report for the...

  12. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  13. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  14. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  15. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  16. National Environmental Policy Act guidance: A model process

    International Nuclear Information System (INIS)

    Angle, B.M.; Lockhart, V.A.T.; Sema, B.; Tuott, L.C.; Irving, J.S.

    1995-04-01

    The ''Model National Environmental Policy Act (NEPA) Process'' includes: References to regulations, guidance documents, and plans; training programs; procedures; and computer databases. Legislative Acts and reference documents from Congress, US Department of Energy, and Lockheed Idaho Technologies Company provide the bases for conducting NEPA at the Idaho National Engineering Laboratory (INEL). Lockheed Idaho Technologies Company (LITCO) NEPA / Permitting Department, the Contractor Environmental Organization (CEO) is responsible for developing and maintaining LITCO NEPA and permitting policies, guidance, and procedures. The CEO develops procedures to conduct environmental evaluations based on NEPA, Council on Environmental Quality (CEQ) regulations, and DOE guidance. This procedure includes preparation or support of environmental checklists, categorical exclusion determinations, environmental assessment determinations, environmental assessments, and environmental impact statements. In addition, the CEO uses this information to train personnel conducting environmental evaluations at the INEL. Streamlining these procedures fosters efficient use of resources, quality documents, and better decisions on proposed actions

  17. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  18. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  19. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  20. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  1. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  2. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  3. Environmental information volume: Liquid Phase Methanol (LPMEOH trademark) project

    International Nuclear Information System (INIS)

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature

  4. Short- and medium-term efficacy of a Web-based computer-tailored nutrition education intervention for adults including cognitive and environmental feedback: randomized controlled trial.

    Science.gov (United States)

    Springvloet, Linda; Lechner, Lilian; de Vries, Hein; Candel, Math J J M; Oenema, Anke

    2015-01-19

    Web-based, computer-tailored nutrition education interventions can be effective in modifying self-reported dietary behaviors. Traditional computer-tailored programs primarily targeted individual cognitions (knowledge, awareness, attitude, self-efficacy). Tailoring on additional variables such as self-regulation processes and environmental-level factors (the home food environment arrangement and perception of availability and prices of healthy food products in supermarkets) may improve efficacy and effect sizes (ES) of Web-based computer-tailored nutrition education interventions. This study evaluated the short- and medium-term efficacy and educational differences in efficacy of a cognitive and environmental feedback version of a Web-based computer-tailored nutrition education intervention on self-reported fruit, vegetable, high-energy snack, and saturated fat intake compared to generic nutrition information in the total sample and among participants who did not comply with dietary guidelines (the risk groups). A randomized controlled trial was conducted with a basic (tailored intervention targeting individual cognition and self-regulation processes; n=456), plus (basic intervention additionally targeting environmental-level factors; n=459), and control (generic nutrition information; n=434) group. Participants were recruited from the general population and randomly assigned to a study group. Self-reported fruit, vegetable, high-energy snack, and saturated fat intake were assessed at baseline and at 1- (T1) and 4-months (T2) postintervention using online questionnaires. Linear mixed model analyses examined group differences in change over time. Educational differences were examined with group×time×education interaction terms. In the total sample, the basic (T1: ES=-0.30; T2: ES=-0.18) and plus intervention groups (T1: ES=-0.29; T2: ES=-0.27) had larger decreases in high-energy snack intake than the control group. The basic version resulted in a larger decrease in

  5. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  6. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  7. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  8. AQUIS: An air quality and permit information management system

    Energy Technology Data Exchange (ETDEWEB)

    Smith, A.E.; Huber, C.C.; Tschanz, J. (Argonne National Lab., IL (USA)); Ryckman, S.J. Jr. (Air Force Logistics Command, Wright-Patterson AFB, OH (USA))

    1991-01-01

    The Air Quality Utility Information System (AQUIS) is a data base management system that operates on a dedicated, IBM-compatible personal computer using dBASE IV. AQUIS is in operation at six of the seven US Air Force Logistics Command (AFLC) bases to assist with the management of the source inventory, permit tracking, and the estimating and tracking of emissions. The system also provides environmental management personnel with information on regulatory requirements and other compliance information. An AFLC base can have over 500 regulated or unregulated emission sources, and the task of tracking and correlating emissions, sources, and permits is substantial. AQUIS is a comprehensive management tool that provides a single system for storing and accessing information previously available only in multiple, uncorrelated files. This paper discusses the development of the system and provides an overview of the system structure and the relationship of that structure to sources in the field. Certain features such as the linking capability and compound-specific emissions are highlighted. The experience of environmental managers, the ultimate system users, is discussed, including specific ways in which AQUIS has proven useful in responding to managers' needs for air quality information. 10 refs., 3 figs., 1 tab.

  9. Risks for upper respiratory infections in infants during their first months in day care included environmental and child-related factors.

    Science.gov (United States)

    Laursen, Rikke Pilmann; Larnkjaer, Anni; Ritz, Christian; Hojsak, Iva; Michaelsen, Kim; Mølgaard, Christian

    2018-03-14

    We examined the frequency and potential risk factors for respiratory infections, diarrhoea and absences in infants during their first months in day care. This prospective cohort study comprised 269 Danish infants aged eight months to 14 months and was part of a study that examined how probiotics affected absences from day care due to respiratory and gastrointestinal infections. The risk factors examined were the household, child characteristics and type of day care facility. Parents registered upper respiratory tract infections (URTIs), lower respiratory tract infections (LRTIs), diarrhoea and day care absences on web-based questionnaires. Over a mean of 5.6 months in day care, 36% and 20% of the infants had at least one URTI or LRTI, and 60% had diarrhoeal episodes. The risk of at least one URTI was increased by previous respiratory infections, with an odds ratio (OR) of 2.65, but was inversely associated with having a pet (OR: 0.43), being cared for by registered child minders compared to day care centres (OR: 0.36), birthweight (OR 0.40) and age at day care enrolment (OR: 0.64). No significant risk factors for LRTIs and diarrhoea were found. Infection risks were associated with environmental factors and factors related to the child. ©2018 Foundation Acta Paediatrica. Published by John Wiley & Sons Ltd.

  10. Effects of Cd and Ni toxicity to Ceratophyllum demersum under environmentally relevant conditions in soft and hard water including a German lake

    Energy Technology Data Exchange (ETDEWEB)

    Andresen, Elisa, E-mail: Elisa.Andresen@uni-konstanz.de [University of Konstanz, Department of Biology, D-78457 Konstanz (Germany); Opitz, Judith, E-mail: Daniela.Opitz@uni-konstanz.de [University of Konstanz, Department of Biology, D-78457 Konstanz (Germany); Thomas, George, E-mail: George.Thomas@uni-konstanz.de [University of Konstanz, Department of Biology, D-78457 Konstanz (Germany); Stärk, Hans-Joachim, E-mail: Ha-Jo.Staerk@ufz.de [UFZ – Helmholtz Centre for Environmental Research, Department of Analytical Chemistry, Permoserstr. 15, D-04318 Leipzig (Germany); Dienemann, Holger, E-mail: Holger.Dienemann@smul.sachsen.de [Saxon State Company for Environment and Agriculture, Business Domain 5 (Laboratory), Department 53, Bitterfelder Str. 25, D-04849 Bad Düben (Germany); Jenemann, Kerstin, E-mail: Kerstin.Jenemann@smul.sachsen.de [Sächsisches Landesamt für Umwelt, Landwirtschaft und Geologie, Abteilung Wasser, Boden, Wertstoffe, Zur Wetterwarte 11, D-01109 Dresden (Germany); Dickinson, Bryan C., E-mail: Bryan.Dickinson@gmail.com [Harvard University, Department of Chemistry and Chemical Biology, 12 Oxford Street, Cambridge, MA 02138 (United States); Küpper, Hendrik, E-mail: Hendrik.Kuepper@uni-konstanz.de [University of Konstanz, Department of Biology, D-78457 Konstanz (Germany); University of South Bohemia, Faculty of Biological Sciences and Institute of Physical Biology, Branišovská 31, CZ-370 05 České Budejovice (Czech Republic)

    2013-10-15

    Highlights: •Hardly any macrophytic growth occurred in an oligotrophic hard water lake in Germany. •All parameters were optimal, besides elevated, nanomolar concentrations of Ni and Cd. •We cultivated submerged macrophytes in real and simulated hard and soft lake water. •Nanomolar Cd and Ni inhibited the plants’ photosynthetic light reactions in soft water. •The inhibition was synergistic, i.e. stronger than the addition of Cd and Ni effects. -- Abstract: Even essential trace elements are phytotoxic over a certain threshold. In this study, we investigated whether heavy metal concentrations were responsible for the nearly complete lack of submerged macrophytes in an oligotrophic lake in Germany. We cultivated the rootless aquatic model plant Ceratophyllum demersum under environmentally relevant conditions like sinusoidal light and temperature cycles and a low plant biomass to water volume ratio. Experiments lasted for six weeks and were analysed by detailed measurements of photosynthetic biophysics, pigment content and hydrogen peroxide production. We established that individually non-toxic cadmium (3 nM) and slightly toxic nickel (300 nM) concentrations became highly toxic when applied together in soft water, severely inhibiting photosynthetic light reactions. Toxicity was further enhanced by phosphate limitation (75 nM) in soft water as present in many freshwater habitats. In the investigated lake, however, high water hardness limited the toxicity of these metal concentrations, thus the inhibition of macrophytic growth in the lake must have additional reasons. The results showed that synergistic heavy metal toxicity may change ecosystems in many more cases than estimated so far.

  11. Effects of Cd and Ni toxicity to Ceratophyllum demersum under environmentally relevant conditions in soft and hard water including a German lake

    International Nuclear Information System (INIS)

    Andresen, Elisa; Opitz, Judith; Thomas, George; Stärk, Hans-Joachim; Dienemann, Holger; Jenemann, Kerstin; Dickinson, Bryan C.; Küpper, Hendrik

    2013-01-01

    Highlights: •Hardly any macrophytic growth occurred in an oligotrophic hard water lake in Germany. •All parameters were optimal, besides elevated, nanomolar concentrations of Ni and Cd. •We cultivated submerged macrophytes in real and simulated hard and soft lake water. •Nanomolar Cd and Ni inhibited the plants’ photosynthetic light reactions in soft water. •The inhibition was synergistic, i.e. stronger than the addition of Cd and Ni effects. -- Abstract: Even essential trace elements are phytotoxic over a certain threshold. In this study, we investigated whether heavy metal concentrations were responsible for the nearly complete lack of submerged macrophytes in an oligotrophic lake in Germany. We cultivated the rootless aquatic model plant Ceratophyllum demersum under environmentally relevant conditions like sinusoidal light and temperature cycles and a low plant biomass to water volume ratio. Experiments lasted for six weeks and were analysed by detailed measurements of photosynthetic biophysics, pigment content and hydrogen peroxide production. We established that individually non-toxic cadmium (3 nM) and slightly toxic nickel (300 nM) concentrations became highly toxic when applied together in soft water, severely inhibiting photosynthetic light reactions. Toxicity was further enhanced by phosphate limitation (75 nM) in soft water as present in many freshwater habitats. In the investigated lake, however, high water hardness limited the toxicity of these metal concentrations, thus the inhibition of macrophytic growth in the lake must have additional reasons. The results showed that synergistic heavy metal toxicity may change ecosystems in many more cases than estimated so far

  12. AMS at the ANU including biomedical applications

    Energy Technology Data Exchange (ETDEWEB)

    Fifield, L K; Allan, G L; Cresswell, R G; Ophel, T R [Australian National Univ., Canberra, ACT (Australia); King, S J; Day, J P [Manchester Univ. (United Kingdom). Dept. of Chemistry

    1994-12-31

    An extensive accelerator mass spectrometry program has been conducted on the 14UD accelerator at the Australian National University since 1986. In the two years since the previous conference, the research program has expanded significantly to include biomedical applications of {sup 26}Al and studies of landform evolution using isotopes produced in situ in surface rocks by cosmic ray bombardment. The system is now used for the measurement of {sup 10}Be, {sup 14}C, {sup 26}Al, {sup 36}Cl, {sup 59}Ni and {sup 129}I, and research is being undertaken in hydrology, environmental geochemistry, archaeology and biomedicine. On the technical side, a new test system has permitted the successful off-line development of a high-intensity ion source. A new injection line to the 14UD has been established and the new source is now in position and providing beams to the accelerator. 4 refs.

  13. AMS at the ANU including biomedical applications

    Energy Technology Data Exchange (ETDEWEB)

    Fifield, L.K.; Allan, G.L.; Cresswell, R.G.; Ophel, T.R. [Australian National Univ., Canberra, ACT (Australia); King, S.J.; Day, J.P. [Manchester Univ. (United Kingdom). Dept. of Chemistry

    1993-12-31

    An extensive accelerator mass spectrometry program has been conducted on the 14UD accelerator at the Australian National University since 1986. In the two years since the previous conference, the research program has expanded significantly to include biomedical applications of {sup 26}Al and studies of landform evolution using isotopes produced in situ in surface rocks by cosmic ray bombardment. The system is now used for the measurement of {sup 10}Be, {sup 14}C, {sup 26}Al, {sup 36}Cl, {sup 59}Ni and {sup 129}I, and research is being undertaken in hydrology, environmental geochemistry, archaeology and biomedicine. On the technical side, a new test system has permitted the successful off-line development of a high-intensity ion source. A new injection line to the 14UD has been established and the new source is now in position and providing beams to the accelerator. 4 refs.

  14. Planned development and evaluation protocol of two versions of a web-based computer-tailored nutrition education intervention aimed at adults, including cognitive and environmental feedback.

    Science.gov (United States)

    Springvloet, Linda; Lechner, Lilian; Oenema, Anke

    2014-01-17

    Despite decades of nutrition education, the prevalence of unhealthy dietary patterns is still high and inequalities in intake between high and low socioeconomic groups still exist. Therefore, it is important to innovate and improve existing nutrition education interventions. This paper describes the development, design and evaluation protocol of a web-based computer-tailored nutrition education intervention for adults targeting fruit, vegetable, high-energy snack and fat intake. This intervention innovates existing computer-tailored interventions by not only targeting motivational factors, but also volitional and self-regulation processes and environmental-level factors. The intervention development was guided by the Intervention Mapping protocol, ensuring a theory-informed and evidence-based intervention. Two versions of the intervention were developed: a basic version targeting knowledge, awareness, attitude, self-efficacy and volitional and self-regulation processes, and a plus version additionally addressing the home environment arrangement and the availability and price of healthy food products in supermarkets. Both versions consist of four modules: one for each dietary behavior, i.e. fruit, vegetables, high-energy snacks and fat. Based on the self-regulation phases, each module is divided into three sessions. In the first session, feedback on dietary behavior is provided to increase awareness, feedback on attitude and self-efficacy is provided and goals and action plans are stated. In the second session goal achievement is evaluated, reasons for failure are explored, coping plans are stated and goals can be adapted. In the third session, participants can again evaluate their behavioral change and tips for maintenance are provided. Both versions will be evaluated in a three-group randomized controlled trial with measurements at baseline, 1-month, 4-months and 9-months post-intervention, using online questionnaires. Both versions will be compared with a generic

  15. Hanford Site Solid Waste Landfill permit application. Revision 1

    International Nuclear Information System (INIS)

    1993-01-01

    Both nonhazardous and nonradioactive sanitary solid waste are generated at the Hanford Site. This permit application describes the manner in which the Solid Waste Landfill will be operated. A description is provided of the landfill, including applicable locational, general facility, and landfilling standards. The characteristics and quantity of the waste disposed of are discussed. The regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill are reviewed. A plan is included of operation, closure, and postclosure. This report addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill is discussed

  16. 40 CFR 72.73 - State issuance of Phase II permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false State issuance of Phase II permits. 72.73 Section 72.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.73 State issuance of Phase II permits...

  17. 77 FR 24200 - Clean Air Act Operating Permit Program; Petitions for Objection to State Operating Permits for...

    Science.gov (United States)

    2012-04-23

    ... Objection to State Operating Permits for Consolidated Environmental Management, Inc.--Nucor Steel Louisiana... Management, Inc.--Nucor Steel Louisiana (``Nucor'') in Saint James Parish, Louisiana. Pursuant to sections... Environmental Management, Inc.--Nucor Steel Louisiana (``Nucor'') is available electronically at: http://www.epa...

  18. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  19. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  20. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  1. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  2. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  3. 76 FR 303 - Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 239 and 258 [EPA-EPA-R10-RCRA-2010-0953; FRL-9247-5] Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental... modification of its approved Municipal Solid Waste Landfill (MSWLF) permit program. On March 22, 2004, EPA...

  4. Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act_considered MAJOR permits

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — Air emission points for facilities in Iowa with operating permits for Title V of the Federal Clean Air Act, considered "major" permits. Also includes emission points...

  5. Hanford Facility dangerous waste permit application, general information

    International Nuclear Information System (INIS)

    1993-05-01

    The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility

  6. Meeting NPDES permit limits for an effluent-dependent stream

    International Nuclear Information System (INIS)

    Payne, W.L.

    1998-01-01

    When the Savannah River Site in Aiken, South Carolina received a National Pollutant Discharge Elimination System permit containing very low copper and toxicity limits for an effluent-dependent stream, an innovative and cost-effective method to meet them was sought. The South Carolina Department of Health and Environmental Control mandated that compliance with the new limits be achieved within three years of the effective date of the permit. SRS personnel studied various regulatory options for complying with the new limits including Water Effect Ratio, use of a Metals Translator, blending with additional effluents, and outfall relocation. Regulatory options were determined to not be feasible because the receiving stream is effluent dependent. Treatment options were studied after it was determined that none of the regulatory pathways were viable. Corrosion inhibitors were evaluated on a full-scale basis with only limited benefits. Ion exchange was promising, but not cost effective for a high flow effluent with a very low concentration of copper. A treatment wetlands, not normally given consideration for the removal of metals, proved to be the most cost effective method studied and is currently under construction

  7. 77 FR 54604 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-05

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicant requests a permit to export sport hunted trophies of one male addax (Addax nasomaculatus), one.... Applicant: John Fry, Carson City, NV; PRT-82592A The applicant requests a permit to import a sport-hunted...

  8. 78 FR 76171 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-12-16

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and...: Geoffrey Ridder; Utopia, TX; PRT-00030B The applicant requests a permit to export the sport-hunted trophy... period. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  9. 40 CFR 123.25 - Requirements for permitting.

    Science.gov (United States)

    2010-07-01

    ... MS4, may I share the responsibility to implement the minimum control measures with other entities... held prior to issuing any permit while reducing the amount of advance notice of such a hearing. State... individual, including the Director, who has or shares authority to approve all or portions of permits either...

  10. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  11. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  12. 1991 Environmental Monitoring Report Tonopah Test Range, Tonopah, Nevada

    International Nuclear Information System (INIS)

    Howard, D.; Culp, T.

    1992-11-01

    This report summarizes the environmental surveillance activities conducted by the US Environmental Protection Agency (EPA) and Reynolds Electrical and Engineering Company (REECO) for the Tonopah Test Range (TTR) operated by Sandia National Laboratories (SNL). Other environmental compliance programs such as the National Environmental Policy Act of 1969 (NEPA), environmental permits, environmental restoration, and waste management programs are also included. The 1991 SNL, TTR, operations had no discernible impact on the general public or the environment. This report 3-s prepared for the US Department of Energy (DOE) in compliance with DOE Order 5400.1

  13. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  14. Example evaluation of a permit application for a proposed hazardous-waste landfill in eastern Adams County, Colorado

    Science.gov (United States)

    Banta, E.R.

    1986-01-01

    A project was undertaken by the U.S. Geological Survey in cooperation with the U. S. Environmental Protection Agency to demonstrate methods by which RCRA (Resources Conservation and Recovery Act of 1976) Part B permit applications might be evaluated. The purpose of the project was to prepare a report that would supplement a series of case studies to be made available to permit writers in the U.S. Environmental Protection Agency. Four sites in the United States were chosen for their potential applicability to geologically similar sites. The Adams County, Colorado, site was chosen to be representative of sites in the Upper Cretaceous Pierre Shale. The intent of this report is to provide an example of how available earth-science information might be used in evaluating an application and not to evaluate the acceptability of the site. Because this study is an evaluation of a permit application, the data used are limited to the data supplied in the application and in published reports. Of the five criteria required by the U.S. Environmental Protection Agency to be addressed in the permit application considered in the case study, the application was evaluated to be inadequate in addressing three criteria: (1) Site characterization, (2) ability to monitor the location, and (3) flow paths and 100-foot time of travel. Details of the inadequacies and a description of the information needed to eliminate the inadequacies are included in the report. (USGS)

  15. PSD permit compliance strategies

    International Nuclear Information System (INIS)

    Cassada, J.; Astruc, S.

    1993-01-01

    Old Dominion is a not-for-profit generation and transmission cooperative owned by and serving twelve member electric distribution cooperatives in Virginia, Maryland and Delaware. These member cooperatives purchase from Old Dominion all the electric power they supply to over 345,000 member consumers. In 1988, Old Dominion evaluated its long term power needs, and the fact that 300 Megawatts (MW) of base power would have to be replaced by the end of 1994. A power supply alternative study was conducted, and concluded that the interests of the cooperative members would best be served through the construction of a conventional pulverized coal-fired generating units. After comprehensive evaluation and negotiations, Old Dominion signed a contract in April, 1989 with the Consortium of Combustion Engineering, H. B. Zachry, Black ampersand Veatch and Westinghouse for the turnkey construction of a 393 MW coal-fired facility. The contract included an option to build a second twin unit. This option was exercised in August, 1989, when Virginia Power joined Old Dominion as 50% partners in the Clover Project. The partnership agreement stipulates that Old Dominion is responsible for the licensing and construction of the plant and Virginia Power will be responsible for operations

  16. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  17. 77 FR 26353 - Notice of Availability of the Environmental Assessment and Request for Comments on Environmental...

    Science.gov (United States)

    2012-05-03

    ... attaches religious or cultural significance to historic properties that may be affected by construction of... all applications for Presidential permits for the construction, connection, operation, or maintenance... consideration of many factors, which can include energy security, environmental, cultural, economic and foreign...

  18. Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

    Energy Technology Data Exchange (ETDEWEB)

    Van Cleve, Frances B.; Copping, Andrea E.

    2010-11-30

    The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

  19. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  20. 75 FR 3731 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging-Permit Number IDG-37-0000

    Science.gov (United States)

    2010-01-22

    ... System (NPDES) general permit to placer mining operations in Idaho for small suction dredges (intake... ENVIRONMENTAL PROTECTION AGENCY [FRL-9104-3] Proposed Issuance of a General NPDES Permit for Small... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  1. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  2. Hanford Site Solid Waste Landfill permit application

    International Nuclear Information System (INIS)

    1991-01-01

    Daily activities at the Hanford Site generate sanitary solid waste (nonhazardous and nonradioactive) that is transported to and permanently disposed of at the Hanford Site Solid Waste Landfill. This permit application describes the manner in which the solid Waste Landfill will be operated under Washington State Department of Ecology Minimum Functional Standards for Solid Waste Handling, Washington Administrative Code 173-304. The solid Waste Landfill is owned by the US Department of Energy -- Richland Operations Office and is used for disposal of solid waste generated at the US Department of Energy Hanford Site. The jurisdictional health department's permit application form for the Solid Waste Landfill is provided in Chapter 1.0. Chapter 2.0 provides a description of the Hanford Site and the Solid Waste Landfill and reviews applicable locational, general facility, and landfilling standards. Chapter 3.0 discusses the characteristics and quantity of the waste disposed of in the Solid Waste Landfill. Chapter 4.0 reviews the regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill. Chapters 5.0, 6.0, and 7.0 contain the plan of operation, closure plan, and postclosure plan, respectively. The plan of operation describes the routine operation and maintenance of the Solid Waste Landfill, the environmental monitoring program, and the safety and emergency plans. Chapter 5.0 also addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The postclosure plan describes requirements for final cover maintenance and environmental monitoring equipment following final closure. Chapter 8.0 discusses the integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill. 76 refs., 48 figs, 15 tabs

  3. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  4. Transversalidad de conceptos de educación ambiental para un desarrollo sostenible presentes en la legislación argentina Environmental education as a crosscutting issue for sustainable developement concepts included in Argentine regulations

    Directory of Open Access Journals (Sweden)

    Lidia Giuffré

    2007-07-01

    instituciones de educación superior. Se asegura el derecho a la información, todo habitante podrá obtener de las autoridades la información ambiental que administren y que no se encuentre contemplada legalmente como reservada. Los aspectos más importantes acerca de la educación ambiental y el desarrollo sostenible son ejes transversales de leyes de distinta jurisdicción, pero deberá bregarse por el cumplimiento y control de dichos principios, debido a las características con las que se percibe al derecho ambiental, de baja eficacia y eficiencia.Population environmental education must be conveyed in all educational levels, in order to contribute to a deep knowledge of environmental protection laws. These include contents about environmental education, but with scarce diffusion and low adhesion. If environmental education could force a detailed knowledge about regulations, its application could be demanded by community actions. Moreover, environmental education is considered in regulations as a fundamental tool for sustainable development. There is a profuse legislation in Argentina, with more than 3,000 legal instruments of different hierarchical order and jurisdictional level. Three argentine laws were studied and compared: Environmental General Law (national: Law 25,675; La Pampa Environmental Law (province order: Law 1,914; and Environmental Education Law of Buenos Aires (city order: Law 1,687. These laws regulate the incorporation of environmental education in formal system (public and private schools and institutions, for all levels: initial, primary, secondary and university studies, non formal system (extra-curricular activities and/or extension inside the institutions, and non formal education (by means of massive instruments of communication and information. Environmental education is considered as the basic tool to generate values, behavior and attitudes according to a balanced environment, tending to the preservation of natural resources and their sustainable

  5. 40 CFR 146.9 - Criteria for establishing permitting priorities.

    Science.gov (United States)

    2010-07-01

    ....9 Criteria for establishing permitting priorities. In determining priorities for setting times for... priorities. 146.9 Section 146.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER... (a), (c), (g) or § 144.22(f), the Director shall base these priorities upon consideration of the...

  6. 40 CFR 144.41 - Minor modifications of permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Minor modifications of permits. 144.41 Section 144.41 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS... responsibility, coverage, and liability between the current and new permittees has been submitted to the Director...

  7. 40 CFR 221.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... of the proposed dumping on the marine environment, navigation, living and non-living marine resource... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Applications for permits. 221.1 Section 221.1 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING...

  8. 77 FR 49453 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-16

    ... citations to, and analyses of, the applicable laws and regulations. We will not consider or include in our... period. Applicant: Alexandria Rosati, Cambridge, MA; PRT-72061A The applicant requests a permit to...

  9. Oversize/overweight permitting practices review : phase II.

    Science.gov (United States)

    2013-02-01

    This study explores a more detailed analysis of the permitting process in the Mid-Atlantic Region and : delves into operational practice, and theory and history of the practice among states. The states : practices examined in greater detail include C...

  10. 76 FR 27660 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-05-12

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... applicant requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus...

  11. 76 FR 20705 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2011-04-13

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  12. 78 FR 59052 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-09-25

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  13. 78 FR 45954 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-07-30

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  14. 76 FR 52965 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-24

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  15. 75 FR 63196 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-10-14

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  16. 75 FR 76022 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-07

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... public display. Multiple Applicants The following applicants each request a permit to import the sport...

  17. 76 FR 39432 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-07-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants (New Applications) The following applicants each request a permit to import the sport...

  18. 78 FR 112 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-02

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  19. 78 FR 62647 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-10-22

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  20. 77 FR 72882 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-12-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  1. 75 FR 41235 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-15

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... the species. Multiple Applicants The following applicants each request a permit to import the sport...

  2. 78 FR 21627 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-04-11

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... Tapiridae Applicant: Michael Tomb, Jackson, LA; PRT-01602B The applicant requests a permit to import a sport...

  3. 75 FR 44986 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  4. 76 FR 51051 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-17

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  5. 76 FR 32223 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-06-03

    ... studies; and (2) Those that include citations to, and analyses of, the applicable laws and regulations. We... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  6. 76 FR 80384 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-12-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  7. 76 FR 60862 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... The following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  8. 76 FR 72434 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  9. 76 FR 65207 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-10-20

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  10. 76 FR 71069 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-16

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  11. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  12. 50 CFR 13.12 - General information requirements on applications for permits.

    Science.gov (United States)

    2010-10-01

    ... available, occupation, and any business, agency, organizational, or institutional affiliation associated... permits, together with any additional justification, including supporting documentation as required by the... permit Section Importation at nondesignated ports: Scientific 14.31 Deterioration prevention 14.32...

  13. 32 CFR 767.9 - Content of permit holder's final report.

    Science.gov (United States)

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE.... The permit holder's final report shall include the following: (a) A site history and a contextual...

  14. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  15. Report on the behalf of the Sustainable Development and Land Planning Commission on the bill project aiming at forbidding the exploration and exploitation of liquid or gaseous hydrocarbon mines by hydraulic fracturing, and abrogating exclusive search permits including projects using this technique

    International Nuclear Information System (INIS)

    Havard, M.; Chanteguet, J.P.

    2011-01-01

    In a first part, this report presents the exploitation of liquid and gaseous hydrocarbons as a new gold rush, notably in Canada and in the USA where this exploitation started at the beginning of the 2000's. The authors recall that this resource has been well known for many years, present the technology applied to extract these products: a combination of vertical and horizontal drilling followed by hydraulic fracturing. Then, they outline health and environmental risks associated with hydraulic fracturing, at any stage of the process (important water supply, ground water pollution, used water treatment, use of chemical additives, impact on landscape, greenhouse gas emission). In the second part, the authors notice that France is among the most attractive countries in Europe for the projects of gas and oil companies, and outline the need to reinforce the mining and environmental legal framework. A last part reports the discussions about the bill project articles

  16. 78 FR 7428 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-02-01

    ... the March 28, 2011 petition, submitted by the Louisiana Environmental Action Network (LEAN), Sierra..., 2011 to Noranda Alumina, LLC, for the operation of the alumina production plant located in Gramercy, St... production plant in Gramercy, St. James Parish, Louisiana for the following reasons: (1) The Title V Permit...

  17. Hanford facility dangerous waste permit application, general information portion. Revision 3

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1997-01-01

    Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options)

  18. Hanford facility dangerous waste permit application, general information portion. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Sonnichsen, J.C.

    1997-08-21

    Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

  19. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  20. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  1. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  2. 40 CFR 122.28 - General permits (applicable to State NPDES programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... ELIMINATION SYSTEM Permit Application and Special NPDES Program Requirements § 122.28 General permits... 40 Protection of Environment 21 2010-07-01 2010-07-01 false General permits (applicable to State NPDES programs, see § 123.25). 122.28 Section 122.28 Protection of Environment ENVIRONMENTAL PROTECTION...

  3. 76 FR 48861 - Notice of Issuance of Final Outer Continental Shelf Air Permit for Anadarko Petroleum Corporation

    Science.gov (United States)

    2011-08-09

    ... Continental Shelf Air Permit for Anadarko Petroleum Corporation AGENCY: Environmental Protection Agency (EPA... final Outer Continental Shelf (OCS) air permit for Anadarko Petroleum Corporation (Anadarko). The permit... Petroleum Corporation regarding the project. EPA carefully reviewed each of the comments submitted and...

  4. A qualitative description of falls in a neuro-rehabilitation unit: the use of a standardised fall report including the International Classification of Functioning (ICF) to describe activities and environmental factors.

    Science.gov (United States)

    Saverino, Alessia; Moriarty, Amy; Rantell, Khadija; Waller, Denise; Ayres, Rachael; Playford, Diane

    2015-01-01

    Falls are a recognised problem for people with long-term neurological conditions but less is known about fall risk in young adults. This study describes fallers' and falls' characteristics in adults less than 60 years old, in a neuro-rehabilitation unit. This single-centre, longitudinal, observational study included 114 consecutive admissions to a UK neuro-rehabilitation unit over 20 months. The demographic and clinical characteristics of eligible patients included age, sex, diagnosis, hospital length of stay and the Functional Independence Measure (FIM). Falls were recorded prospectively in a fall report, using the activities and environmental domains of the International Classification of Functioning (ICF). A total of 34 (30%) patients reported a fall, with 50% experiencing more than one fall. The majority of falls (60%) occurred during the first 2 weeks, during day-time (90%) and during mobile activities (70%). Overall, falls rate (95% confidence interval) was 1.33 (1.04 to 1.67) per 100 d of patient hospital stay. Factors associated with increased falls included becoming a walker during admission or being cognitively impaired. There were no serious fall-related injuries. The first 2 weeks of admission is a high risk time for fallers, in particular those who become walkers or are cognitively impaired. Prevention policies should be put in place based on fall characteristics. Implications for Rehabilitation The ICF is a valuable instrument for describing subject and environmental factors during a fall-event. Falls are frequent events but do not usually cause serious injuries during inpatient rehabilitation. There is an increased fall risk for subjects with cognitive impairments or those relearning how to walk.

  5. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  6. 77 FR 65401 - Notice of Availability of the Final Environmental Impact Statement for the Restoration Design...

    Science.gov (United States)

    2012-10-26

    ... environmentally responsible production of renewable energy and allows the permitting of future renewable energy..., including solar and wind energy technologies, and to establish a baseline set of environmental protection...), which are BLM-administered lands that are suitable for the development of solar and wind energy...

  7. Requirements for permitting a mixed waste incinerator

    International Nuclear Information System (INIS)

    Trichon, M.; Feldman, J.; Serne, J.C.

    1990-01-01

    The consideration, design, selection and operation of any incinerator depends primarily on characteristic quality (ultimate and proximate analyses) and quantity to the waste to be incinerated. In the case of burning any combination of mixed hazardous, biomedical and radioactive low level waste, specific federal and generic state environmental regulatory requirements are outlined. Combustion chamber temperature and waste residence time requirements will provide the rest of the envelope for consideration. Performance requirements must be balanced between the effects of time and temperature on destruction of the organic waste and the vaporization and possible emission of the inorganic waste components (e.g., toxic metals, radioactive inorganics) as operating conditions and emission levels will be set in state and federal regulatory permits. To this end the complete characterization of the subject waste stream must be determined if an accurate assessment of incineration effectiveness and impact are to be performed

  8. A Review of the Environmental Impacts for Marine and Hydrokinetic Projects to Inform Regulatory Permitting: Summary Findings from the 2015 Workshop on Marine and Hydrokinetic Technologies, Washington, D.C.

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, E. Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Christol, Corrie [National Renewable Energy Lab. (NREL), Golden, CO (United States); LiVecchi, Al [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kramer, Sharon [H.T. Harvey and Associates, Los Gatos, CA (United States); West, Anna [Kearns & West, Inc., San Francisco, CA (United States)

    2016-07-01

    In 2014 and 2015, the U.S. Department of Energy initiated efforts to develop and implement technology- and application-focused marine and hydrokinetic (MHK) workshops to share the global experience and knowledge base on evolving MHK technologies, observed and not-observed impacts, monitoring and measurement methods, and regulatory needs. The resulting MHK Regulator Workshops engaged resource managers and other decision makers at key regulatory organizations, scientists, researchers, facilitators, and technical experts and provided an opportunity to examine the risks of single-device and small-scale deployments, explore what can be learned and observed from single devices and small-scale arrays, and consider requirements for projects at varying scales of deployment. Experts and stakeholders identified key remaining information gaps. Initial discussions focused on differentiating between monitoring required for single or small-scale deployments and MHK impact research that, although important, goes beyond what is feasible or should be needed to meet specific project regulatory requirements but is appropriate for broader research and development. Four areas of identified potential environmental impacts provided the focus for the workshop: acoustic output impacts, electromagnetic field (EMF) emissions, physical interactions, and environmental effects of MHK energy development on the physical environment. Discussions also focused on the regulatory process and experience, adaptive management, industry drivers, and lessons that can be learned from the wind energy industry. The discussion was set in the context of the types of MHK technologies that are currently proposed or planned in the United States. All presentations and the following discussions are summarized in this document.

  9. Applying tradable permits to biodiversity conservation: A conceptual analysis of trading rules

    OpenAIRE

    Wissel, Silvia; Wätzold, Frank

    2008-01-01

    Tradable permits have already been applied in many areas of environmental policy and may be a possible response to increasing calls for flexible conservation instruments which are able to successfully conserve biodiversity while allowing for economic development. The idea behind applying tradable permits to conservation is that developers wishing to turn land to economic purposes, thereby destroying valuable habitat, may only do so if they submit a permit to the conservation agency showing th...

  10. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  11. Environmentally Regulated Facilities in Iowa

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — A unique record for each facility site with an environmental interest by DNR (such as permits). This brings together core environmental information in one place for...

  12. Concept for integrated environmental monitoring. Scientific approach

    Energy Technology Data Exchange (ETDEWEB)

    Haber, W [comp.; Schoenthaler, K; Kerner, H F; Koeppel, J; Spandau, L

    1998-09-01

    Despite considerable expenditures for environmental protection and intensified efforts in the areas of environmental research and monitoring, environmental damage increasingly occurs, sometimes with global effects, largely due to the lack of early diagnosis. In the past few years various institutions have therefore demanded improvements in environmental monitoring. The Council of Experts on Environmental Issues (`Rat von Sachverstaendigen fuer Umweltfragen`, SRU), in particular, in its `Environmental Report` of 1987 and in its Special Report on `General Ecological Environmental Monitoring` (1990) presented far-reaching demands for a nationwide ecological early warning system which should integrate the various local, regional, national, and even global monitoring levels, and which should encompass an environmental monitoring of entire ecosystems at representative locations. This is aimed at creating the prerequisites for - detection of long-term gradual environmental change, - confirmation of refutation of initial assumptions regarding the causes of these environmental changes, - permitting decisions on preventive actions to stabilize or improve environmental conditions and - making it possible to assess the success of environmental protection policies. This report includes an abbreviated version and documentation of the conference on the `Concept for Integrated Environmental Monitoring` and the final report `Specification of the Concept for Integrated Environmental Monitoring from the Perspective of Nature Conservation`. (orig.)

  13. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    , which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 458.1, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies.

  14. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    The overall objective of this report is to analyze and compare the legal permitting and planning process for (first and foremost) new nuclear power stations in a number of selected countries. In this way the report provides relevant knowledge that could form the basis for discussing the efficiency of various national licensing processes (include the Swedish one). The study builds heavily on the analysis of legal documents and regulations, and addresses both the formal requirements for licensing and territorial planning procedures as well as the issues of public participation and access to justice in the respective countries. In addition to this legal approach, however, we also adopt an investor's perspective on the legislation, i.e., an analysis of the legal rules can influence investment decisions in practice. Furthermore, the study relies largely on a synthesis of previous studies as well as interviews with researchers, electricity companies and government officials in Sweden and abroad. The countries that are compared include Sweden, Finland, France, Canada, Switzerland, Great Britain, USA and South Korea. These include those that currently invest in new nuclear power as well as those who have recently reformed their plant permitting processes. The analysis highlights important differences among the various countries, including issues such as the political influence on the licensing process, the allocation of political power between the national and local levels, means of interacting with regular citizens, and the overall transparency and predictability of the legislation. Some selected practical experiences of the current legislation are also presented. The report first provides a short background to the role and the status of nuclear power in the global energy system, and we then present a rather comprehensive comparison of the permitting processes in the above countries. Each country section comprises a short background, a presentation of the existing

  15. Landowner and permit-holder perceptions of wildlife damage around the Idaho National Engineering and Environmental Laboratory. A survey of INEEL neighbors about elk, mule deer, pronghorn antelope, and depredation

    Energy Technology Data Exchange (ETDEWEB)

    Roush, D.E. Jr. [Environmental Science and Research Foundation, Inc., Idaho Falls, ID (United States); Beaver, D.E. [Univ. of Idaho, Moscow, ID (United States). Coll. of Forestry, Wildlife, and Range Sciences

    1998-06-01

    Property-owners (N = 220) around the Idaho National Engineering and Environmental Laboratory (INEEL) in southeastern Idaho were surveyed about depredation, control methods and economic issues related to use of the area by elk (Cervus elaphus), mule deer (Odocoileus hemionus), and pronghorn antelope (Antilocapra americana). Depredation was defined as damage to privately-owned crops, forage, and fences and irrigation equipment by these animals. The focus on the three ungulate species was prompted by concerns that elk, which had recolonized the INEEL since 1984, were responsible for an inordinate amount of unprecedented damage to agricultural operations. As the INEEL is a US Department of Energy (DOE) reserve with little public hunting access, there have been calls for removal of elk from this land. This study`s objective was to quantify the wildlife damage occurring on agricultural operations adjacent to the INEEL and to characterize the damage attributed to each big game species. Responses from 70.2% of the target population indicate an evenness of opinion, by which the authors mean that various opinions were represented equitably, toward these animals and wildlife damage Total estimated wildlife damage in 1996 was between $140,000 and $180,000 It was attributed foremost to elk, although pronghorn antelope were viewed nearly as damaging. Respondents placed high values in big game animals and wished to see them continue to inhabit these lands. For managing depredation, adjusting hunting seasons was preferred.

  16. PSD Permit for the Marblehead Lime Company

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  17. Honda Permits to Install 1 Year Aggregation

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. Airing Your Dirty Laundry: A Quick Marketable Pollution Permits Game for the Classroom

    Science.gov (United States)

    Caviglia-Harris, Jill L.; Melstrom, Richard T.

    2015-01-01

    In this article, the authors describe a simple classroom game that demonstrates the advantage of tradable emissions permits in regulating environmental pollution. Students take on the role of polluters who must consider the costs of complying with a uniform reduction and a tradable permits program. The class is divided into high-cost polluters and…

  19. 77 FR 65875 - Adequacy of Arizona Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2012-10-31

    ... Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... modification to Arizona's municipal solid waste landfill (MSWLF) permit program to allow the State to issue... amending the municipal solid waste landfill criteria at 40 CFR 258.4 to allow for Research, Development...

  20. 76 FR 10894 - Notice of Issuance of Prevention of Significant Deterioration and Federal Operating Permits to...

    Science.gov (United States)

    2011-02-28

    ... Deterioration and Federal Operating Permits to Grand Casino Hinckley AGENCY: Environmental Protection Agency... Corporate Commission doing business as Grand Casino Hinckley. This permit authorizes Grand Casino Hinckley... owned by Mille Lacs Band Corporate Commission doing business as Grand Casino Hinckley. EPA received an...

  1. 75 FR 70254 - PSD and Title V Permitting Guidance for Greenhouse Gases

    Science.gov (United States)

    2010-11-17

    ... Guidance for Greenhouse Gases AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability..., ``PSD and Title V Permitting Guidance for Greenhouse Gases'' on its significant guidance Internet Web... guidance titled, ``PSD and Title V Permitting Guidance for Greenhouse Gases.'' This document has been...

  2. 77 FR 25717 - Proposed Issuance of a General NPDES Permit for Small Suction Dredging

    Science.gov (United States)

    2012-05-01

    ...) General Permit (IDG-37-0000) to placer mining operations in Idaho for small suction dredges (intake nozzle... ENVIRONMENTAL PROTECTION AGENCY [FRL-9666-1] Proposed Issuance of a General NPDES Permit for Small... certifies ``will not, if promulgated, have a significant economic impact on a substantial number of small...

  3. 75 FR 53220 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved municipal solid waste landfill (MSWLF) program. The approved modification allows the State to..., and demonstration (RD&D) permits to be issued to certain municipal solid waste landfills by approved...

  4. 76 FR 270 - Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-01-04

    ...] Alaska: Adequacy of Alaska Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... approved Municipal Solid Waste Landfill (MSWLF) permit program. The approved modification allows the State..., EPA issued a final rule (69 FR 13242) amending the Municipal Solid Waste Landfill (MSWLF) criteria in...

  5. 40 CFR 158.210 - Experimental use permit data requirements for product chemistry.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Experimental use permit data requirements for product chemistry. 158.210 Section 158.210 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for product chemistry. All product chemistry data, as described in...

  6. 40 CFR 158.270 - Experimental use permit data requirements for residue chemistry.

    Science.gov (United States)

    2010-07-01

    ... requirements for residue chemistry. 158.270 Section 158.270 Protection of Environment ENVIRONMENTAL PROTECTION... Experimental use permit data requirements for residue chemistry. All residue chemistry data, as described in... section 408(r) is sought. Residue chemistry data are not required for an experimental use permit issued on...

  7. Allocation of emission permits with leakage through capital markets

    International Nuclear Information System (INIS)

    Maestad, Ottar

    2007-01-01

    This paper analyses how tradable emission permits should be allocated to firms when capital is internationally mobile. When international environmental problems are attempted solved through uncoordinated policies between countries, it might be desirable for the home country to issue free emission permits in proportion to the use of capital in order to prevent leakage through international capital movements. The desirability of free emission permits will however be reduced if capital also can be employed in a domestic non-polluting sector. In this case, it may even be optimal to tax the use of capital in the polluting sector. It is also shown that it is always optimal to subsidise the use of capital in the polluting sector if the use of labour is taxed at an optimal rate. Finally, leakage does not affect the optimal domestic emission limit as long as appropriate capital subsidies and labour taxes are implementeed. (author)

  8. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  9. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  10. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  11. Payment for environmental services: the need for re-definition?

    NARCIS (Netherlands)

    Beria, L.; Groot, de R.S.

    2010-01-01

    As an alternative to the “command-and-control” approach, increasing enthusiasm for market-based instruments (MBI) in environmental management arose in the early 80s. It was hoped that MBI, including packaging taxes, effluent taxes and charges, capital or operation subsidies, tradable permits,

  12. Environmental compliance assessment review

    International Nuclear Information System (INIS)

    Hilliday, G.H.

    1991-01-01

    During the period 1972-1991, The United States Congress passed stringent environmental statues which the Environment Protection Agency implemented via regulations. The statues and regulations contain severe civil and criminal penalties. Civil violations resulted in fines, typically payable by the company. The act of willfully and knowingly violating the permit conditions or regulations can result in criminal charges being imposed upon the responsible part, i.e., either the company or individual. Criminal charges can include fines, lawyer fees, court costs and incarceration. This paper describes steps necessary to form an effective Environmental Compliance Assessment Review [CAR] program, train field and engineering personnel and perform a CAR audit. Additionally, the paper discusses the findings of a number of Exploration and Production [E and P] field audits

  13. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  14. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  15. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  16. Kentucky Department for Natural Resources and Environmental Protection permit application for air contaminant source: SRC-I demonstration plant, Newman, Kentucky. Appendix D. Impact assessment. [Demonstration plant at Newman, KY

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-11-21

    In appendix D, the air quality condition for various pollutants in the areas surrounding the proposed demonstration plant site is given with respect to attainment or non-attainment of US EPA regulations. The minimum pollutant emission rates for these regulated and for several other pollutants are given. Then the estimated emission rates from the proposed plant are given for a dozen pollutants which exceed these limits and therefore require an ambient air quality analysis. This involves taking into account the estimated emission of these pollutants from the proposed plant and from other sources in the surrounding area. Finally, background data from the surrounding area including meteorological data and sampling of regulated pollutants are given. (LTN)

  17. Low-Level Burial Grounds Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1989-01-01

    The single dangerous waste permit identification number issued to the Hanford Site by the US Environmental Protection Agency and the Washington State Department of Ecology is US Environmental Protection Agency/State Identification Number WA 7890008967. This identification number encompasses a number of waste management units within the Hanford Site. Westinghouse Hanford Company is a major contractor to the US Department of Energy-Richland Operations Office and serves as co-operator of the Low-Level Burial Grounds, the waste management unit addressed by this permit application. The Low-Level Burial Grounds Dangerous Waste Permit Application consists of both a Part A and a Part B Permit Application. The original Part A, submitted in November 1985, identified landfills, retrievable storage units, and reserved areas. An explanation of subsequent Part A revisions is provided at the beginning of the Part A section. Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology

  18. Permitting plan for the high-level waste interim storage

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist

  19. 75 FR 41163 - Notice of Intent To Prepare an Environmental Impact Statement and Overseas Environmental Impact...

    Science.gov (United States)

    2010-07-15

    ...Pursuant to section 102 of the National Environmental Policy Act (NEPA) of 1969, as implemented by the Council on Environmental Quality Regulations (40 Code of Federal Regulations [CFR] Parts 1500- 1508), and Executive Order 12114, the Department of the Navy (DON) announces its intent to prepare an Environmental Impact Statement (EIS) and Overseas EIS (OEIS) to evaluate the potential environmental effects associated with military readiness training and research, development, testing, and evaluation (RDT&E) activities (hereinafter referred to as ``training and testing'' activities) conducted within the Atlantic Fleet Training and Testing (AFTT) study area. The AFTT study area includes the western North Atlantic Ocean along the east coast of North America (including the area where the Undersea Warfare Training Range will be used), the Chesapeake Bay, and the Gulf of Mexico. Also included are select Navy pierside locations and channels. The AFTT study area does not include the Arctic. This EIS and OEIS is being prepared to renew and combine current regulatory permits and authorizations; address current training and testing not covered under existing permits and authorizations; and to obtain those permits and authorizations necessary to support force structure changes and emerging and future training and testing requirements. The DON will invite the National Marine Fisheries Service to be a cooperating agency in preparation of this EIS and OEIS.

  20. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  1. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  2. Cogeneration offers promise - politics permitting

    Energy Technology Data Exchange (ETDEWEB)

    Koprowski, Gene

    1996-12-01

    India`s Prime Minister H D Deve Gowda and the environmental activist Maneka Gandhi clashed recently over a US1.06 billion cogeneration power plant. Gandhi accused Gowda of moving too fast in giving the plant environmental clearance two days after assuming office. The argument, which delayed the start of a new thermal power plant by US-based Cogenetrix, illustrates the hazards of building such projects in Asia. (author)

  3. Environmental protection in the frame of radiation protection. Recommendation of the Commission on radiological protection including justification and explanation; Schutz der Umwelt im Strahlenschutz. Empfehlung der Strahlenschutzkommission mit Begruendung und Erlaeuterung

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2017-01-15

    The environmental protection is part of the radiation protection but without defined regulations concerning the protection of non-human species and the ecological systems. In 2008 the SSK (Strahlenschutzkommission) was asked to elaborate measures for environmental radiation protection. Part of the recommendation was the application of sustainability concepts on radioactive materials.

  4. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Mike [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 “Recycled Water Rules” and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Quality’s Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  5. 15 CFR 971.406 - Environmental effects.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Environmental effects. 971.406 Section... ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR COMMERCIAL RECOVERY PERMITS Issuance/Transfer....406 Environmental effects. Before issuing or transferring a commercial recovery permit, the...

  6. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1991-02-01

    The Waste Isolation Pilot Plant (WIPP) project was authorized by the Department of Energy National Security and Military Applications of Nuclear Energy Authorization Act of 1980 (Public Law 96-164) as a research and development facility to demonstrate the safe, environmentally sound disposal of transuranic (TRU) radioactive wastes derived from the defense activities of the United States. The WIPP facility is owned and operated by the US Department of Energy (DOE). The TRU waste to be received at WIPP consists largely of such items as laboratory glassware and utensils, tools, scrap metal, shielding, personnel protection equipment, and solidified sludges from the treatment of waste water. Approximately 60 percent of this waste is ''mixed,'' that is, it is also contaminated with hazardous waste or hazardous waste constituents as defined by the Resource Conservation and Recovery Act (RCRA) and by the New Mexico Hazardous Waste Management Regulations (HWMR-5). Therefore, emplacement of TRU mixed waste in the WIPP repository is subject to regulation under HWMR-5 and RCRA. The permit application under the Resource Conservation and Recovery Act for WIPP is divided into five volumes. This document, Volume 1, contains a site and facility description of WIPP; procedures for waste analysis and characterization, testing, monitoring, inspection, and training; hazard prevention, safety and security plans; plans for closure; and a discussion of other applicable laws. Also included are maps, photographs, and diagrams of the facilities and surrounding areas. 180 refs., 75 figs., 24 tabs

  7. Early Site Permit Demonstration Program: Station design alternatives report

    International Nuclear Information System (INIS)

    1993-03-01

    This report provides the results of investigating the basis for including Station Design Alternatives (SDAs) in the regulatory guidance given for nuclear plant environmental reports (ERs), explains approaches or processes for evaluating SDAs at the early site permit (ESP) stage, and applies one of the processes to each of the ten systems or subsystems considered as SDAS. The key objective o this report s to demonstrate an adequate examination of alternatives can be performed without the extensive development f design data. The report discusses the Composite Suitability Approach and the Established Cutoff Approach in evaluating station design alternatives and selects one of these approaches to evaluate alternatives for each of the plant or station that were considered. Four types of ALWRs have been considered due to the availability of extensive plant data: System 80+, AP600, Advanced Boiling Reactor (ABWR), and Simplified Boiling Water Reactor (SBWR). This report demonstrates the feasibility of evaluating station design alternatives when reactor design detail has not been determined, quantitatively compares the potential ental impacts of alternatives, and focuses the ultimate selection of a alternative on cost and applicant-specific factors. The range of alternatives system is deliberately limited to a reasonable number to demonstrate the or to the three most commonly used at operating plants

  8. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  9. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  10. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 2: Chapters 1 through 4

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska (Corps) to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. The Corps determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significant affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), upon review of BPXA's permit application, determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternatives, including BPXA's proposed project, may have on the human environment

  11. Operational environmental monitoring plan for the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Mercer, D.D.; Baker, P.L.; Cockman, J.S.; Fischer, N.T.; Flynn, D.T.; Harvill, J.P.; Knudtsen, K.L.; Louderbough, E.T.

    1989-01-01

    This plan defines the scope and extent of the WIPP effluent and environmental monitoring programs during the facility's operational life. It also discusses the quality assurance/quality control programs which ensure that samples collected and the resulting analytical data are representative of actual conditions at the WIPP site. This plan provides a comprehensive description of environmental activities at WIPP, including: a summary of environmental program information, including an update of the status of environmental permits and compliance activities; a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of applicable standards and regulatory requirements and brief discussions of potential exposure pathways, routine and accidental releases, and their consequences; a summary of the preoperational environmental monitoring and assessment activities and responses to the requirements (Appendix A) and guidelines presented in the ''Radiological Effluent Monitoring and Environmental Surveillance for US DOE Operations.'' 166 refs., 28 figs., 27 tabs

  12. Environmental management

    NARCIS (Netherlands)

    Guicherit, R.

    1996-01-01

    Elements of a national environmental management system include: • monitoring networks to establish the prevailing environmental quality; • emission inventories, and projected emission inventories based on population growth, increase of traffic density, and economie growth; taking into account

  13. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application

    International Nuclear Information System (INIS)

    1993-01-01

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation

  14. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-24

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  15. Environmental surveillance at Los Alamos

    International Nuclear Information System (INIS)

    1979-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1978. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1978 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and groundwater, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs

  16. Savannah River Site environmental report for 1989

    International Nuclear Information System (INIS)

    Cummins, C.L.; Martin, D.K.; Todd, J.L.

    1989-01-01

    The purpose of this report is to meet three of the primary objectives of the Savannah River Site (SRS) environmental monitoring program. These objectives are to assess actual or potential exposures to populations form the presence of radioactive and nonradioactive materials from normal operations or nonroutine occurrences; to demonstrate compliance with applicable authorized limits and legal requirements; and to communicate results of the monitoring program to the public. This 1989 report contains descriptions of radiological and nonradiological monitoring programs, it provides data obtained from these programs, and it describes various environmental research activities ongoing at the site. Also included are summaries of environmental management and compliance activities, a summary of National Environmental Policy Act activities, and a listing of environmental permits issued by regulatory agencies

  17. Savannah River Site environmental report for 1989

    Energy Technology Data Exchange (ETDEWEB)

    Cummins, C.L.; Martin, D.K.; Todd, J.L.

    1989-01-01

    The purpose of this report is to meet three of the primary objectives of the Savannah River Site (SRS) environmental monitoring program. These objectives are to assess actual or potential exposures to populations form the presence of radioactive and nonradioactive materials from normal operations or nonroutine occurrences; to demonstrate compliance with applicable authorized limits and legal requirements; and to communicate results of the monitoring program to the public. This 1989 report contains descriptions of radiological and nonradiological monitoring programs, it provides data obtained from these programs, and it describes various environmental research activities ongoing at the site. Also included are summaries of environmental management and compliance activities, a summary of National Environmental Policy Act activities, and a listing of environmental permits issued by regulatory agencies.

  18. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  19. Environmental Performance Report 2012: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1-1B (Management Report)

    Energy Technology Data Exchange (ETDEWEB)

    2013-07-01

    This report presents a summary of NREL's environmental protection programs and activities for CY 2012. It is organized according to the different environmental media (e.g., air, waste, ground water, etc.), and includes a brief summary of how the program is managed in that area, any permitting or notification efforts that have been completed during the reporting period or are ongoing, and activities that have occurred during the reporting period in that environmental area. A description of the environmental condition and features of NREL's sites is also included to provide a basis for the program overview.

  20. Environmental policy (Republic of Macedonia)

    International Nuclear Information System (INIS)

    1997-01-01

    With a defined set of policy goals, policy makers face an important decision on how and at what cost to the economy environmental compliance can be achieved. The costs of environmental compliance for Macedonia are still to be determined. However, environmental cost estimates, even those done with the highest degree of precision will not provide the actual burden that the society will face. The level of actual costs and their distribution in the economy will depend on the type of instruments that will be used by policy makers. In general, there are two policy options to be considered, namely command and control which relies on administrative instruments and market based which uses economic instrument. The command and control based environmental policy requires that ambient standards, emission standards and new source performance standards are in place, together with a permitting system and compliance monitoring to ensure enforcement. A market based environmental policy aims at achieving higher levels of environmental quality by correcting the imperfections of the market. This is done by what is called internalizing negative environmental externalities. In simple words, polluters are forced to pay a pollution charge or a tax and include the costs of pollution in the costs of production and finally in the prices of goods. (author)

  1. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  2. Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2011-09-01

    The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

  3. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  4. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  5. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  6. Intertemporal Permit Trading for the Control of Greenhouse Gas Emissions

    International Nuclear Information System (INIS)

    Leiby, P.; Rubin, J.

    2001-01-01

    This paper integrates two themes in the intertemporal permit literature through the construction of an intertemporal banking system for a pollutant that creates both stock and flow damages. A permit banking system for the special case of a pollutant that only causes stock damages is also developed. This latter, simpler case corresponds roughly to the greenhouse gas emission reduction regime proposed by the U.S. Department of State as a means of fulfilling the U.S. commitment to the Framework Convention on Climate Change. This paper shows that environmental regulators can achieve the socially optimal level of emissions and output through time by setting the correct total sum of allowable emissions, and specifying the correct intertemporal trading ratio for banking and borrowing. For the case of greenhouse gases, we show that the optimal growth rate of permit prices, and therefore the optimal intertemporal trading rate, has the closed-form solution equal to the ratio of current marginal stock damages to the discounted future value of marginal stock damages less the decay rate of emissions in the atmosphere. Given a non-optimal negotiated emission path we then derive a permit banking system that has the potential to lower net social costs by adjusting the intertemporal trading ratio taking into account the behavior of private agents. We use a simple numerical simulation model to illustrate the potential gains from various possible banking systems. 24 refs

  7. Environmental surveillance at Hanford for CY-1979

    International Nuclear Information System (INIS)

    Houston, J.R.; Blumer, P.J.

    1980-04-01

    Environmental data were collected for most environmental media including air, Columbia River water, external radiation, foodstuffs (milk, beef, eggs, poultry, and produce) and wildlife (deer, fish, and game birds), as well as soil and vegetation samples. In general, offsite levels of radionuclides attributable to Hanford operations during 1979 were indistinguishable from background levels. The data are summarized in the following highlights. Air quality measurements of NO 2 in the vicinity of the Hanford Site and releases of SO 2 onsite were well within the applicable federal and state standards. Particulate air concentrations exceed the standards primarily because of agricultural activities in the area. Discharges of waste water from Hanford facilities in the Columbia River under the National Pollution Discharge Elimination System (NPDES) permit were all within the parameter limits on the permit

  8. Environmental regulations and emissions trading in China

    International Nuclear Information System (INIS)

    Chang, Y.-C.; Wang Nannan

    2010-01-01

    This paper begins with the international context concerning climate change and how China fits into this context. Concentration is then turning into the emissions control system in China including environmental planning, legislation, policy instruments and measures as well as institutional setting in China's environmental governance system. Special attentions also being paid to emissions control in China's power sector. It should be noted that the pollution discharge permit system in China only exists superficially in many places. Insufficient resources are applied to the implementation of the said permit system, which in turn means that the system is applied according to differing standards in different parts of the country. The findings of this paper suggested that emissions trading programmes are usually introduced alongside the existing policies. The power sector usually has numerous other policy objectives and therefore the design and implementation of emissions trading programmes in the sector will have to address concern about the compatibility of existing industry policies.

  9. 22 CFR 161.10 - Non-Federal applicants for permits.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Non-Federal applicants for permits. 161.10 Section 161.10 Foreign Relations DEPARTMENT OF STATE ENVIRONMENTAL PROTECTION REGULATIONS FOR IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) Coordination of Other Requirements of NEPA § 161...

  10. 76 FR 77996 - Notice of Issuance of Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC.

    Science.gov (United States)

    2011-12-15

    ... Final Air Permits for Eni US Operating Co., Inc. and Port Dolphin Energy, LLC. AGENCY: Environmental... 27, 2011, the EPA issued a final Outer Continental Shelf (OCS) air permit for Eni US Operating Inc. (Eni). This permit became effective on November 28, 2011. In addition, the EPA issued a final...

  11. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  12. 76 FR 57757 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-16

    ... a Federal permit is issued that allows such activities. The ESA law requires that we invite public... laws and regulations. We will not consider or include in our administrative record comments we receive....) held in zoos in the United States to the Department of Anthropology, University of Cambridge, Cambridge...

  13. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  14. 50 CFR 13.21 - Issuance of permits.

    Science.gov (United States)

    2010-10-01

    ... material information required, or has made false statements as to any material fact, in connection with his... disqualification has been expressly waived by the Director in response to a written petition. (2) The revocation of..., as well as any other conditions deemed appropriate and included on the face of the permit at the...

  15. 43 CFR 13.2 - Application for permit.

    Science.gov (United States)

    2010-10-01

    ..., Education, and Welfare under the Randolph-Sheppard Vending Stand Act may apply for permits to establish and maintain vending facilities, including both vending stands and machines, to be operated by blind persons... Public Lands: Interior Office of the Secretary of the Interior VENDING FACILITIES OPERATED BY BLIND...

  16. 76 FR 14650 - Endangered Species; Permit No. 13330-01

    Science.gov (United States)

    2011-03-17

    ... Atmospheric Administration (NOAA), Commerce. ACTION: Notice; receipt of modification request. SUMMARY: Notice is hereby given the following applicant has applied in due form for a modification to a permit... Smart Position Only Transmitting (SPOT) tags. Sampling also includes a small genetic tissue fin clip and...

  17. 50 CFR 622.4 - Permits and fees.

    Science.gov (United States)

    2010-10-01

    ... organization. (C) Information concerning vessels, harvesting gear/methods, or fishing areas, as specified on... inspection; (3) Discusses possible hazards to safe navigation or hindrance to vessel traffic, traditional... upon the permitted vessel and/or captain, as appropriate, being included in an active survey frame for...

  18. 78 FR 4162 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-18

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and..., Greer, SC; PRT-89822A The applicant requests a permit to import a sport-hunted trophy of two male... import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a captive...

  19. 75 FR 52971 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-08-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a... applicant requests a permit to re-export a sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  20. Environmental challenge

    International Nuclear Information System (INIS)

    Conable, B.; Warford, J.; Partow, Z.; Lutz, E.; Munasinghe, M.

    1991-09-01

    The contents include the following: Development and the Environment: A Global Balance; Evolution of the World Bank's Environmental Policy; Accounting for the Environment; Public Policy and the Environment; Managing Drylands; Environmental Action Plans in Africa; Agroforestry in Sub-Saharan Africa; Irrigation and the Environmental Challenge; Curbing Pollution in Developing Countries; Global Warming and the Developing World; and The Global Environment Facility

  1. 2003 Wastewater Land Application Site Performance Reports for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Teresa R. Meachum

    2004-02-01

    The 2003 Wastewater Land Application Site Performance Reports for the Idaho National Engineering and Environmental Laboratory describe the conditions for the facilities with State of Idaho Wastewater Land Application Permits. Permit-required monitoring data are summarized, and permit exceedences or environmental impacts relating to the operations of the facilities during the 2003 permit year are discussed.

  2. Environmental radon

    International Nuclear Information System (INIS)

    Majumdar, S.K.; Schmalz, R.F.; Miller, E.W.

    1990-01-01

    This book covers many aspects of environmental radon, including: historical perspectives; occurrence and properties; detection, measurement, and mitigation, radon and health; and political, economic, and legislative impacts

  3. The American experience of negotiable permits to combat air pollution

    International Nuclear Information System (INIS)

    Gros, Ch.

    2001-01-01

    Negotiable permits have been used in various fields, but the system in which they have seen greatest use is undoubtedly the American system of negotiable permits to fight acid rain. Since the 1970's, the United States have introduced elements of flexibility into their policy for fighting atmospheric pollution. These elements have included the family of negotiable permits. However, it was only in 1990 during the vote to amend the law on air cleanliness that a genuine market for the rights to emit SO 2 was set up (taking effect on january 1. 1995). This article analyses this context in order to understand why and how such an instrument has been introduced, and goes on to present the results. (author)

  4. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  5. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  6. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  7. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  8. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ... Civil Works Program (Engineer Circular 1165- 2-211). The current Engineer Circular applies to Corps..., Corps of Engineers Reissuance of Nationwide Permits; Notice #0;#0;Federal Register / Vol. 77 , No. 34..., Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD...

  9. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  10. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  11. Unilateral regulation of bilateral trade in greenhouse gas emission permits

    International Nuclear Information System (INIS)

    Rehdanz, Katrin; Tol, Richard S.J.

    2005-01-01

    This paper considers the coordination of domestic markets for tradable emission permits where countries determine their own emission reduction targets, using a two-country model. Linking such schemes is beneficial to both countries but may cause the exporting country to decrease its emission reduction target and export more permits. This in turn would not only reduce the costs for both countries as less emissions have to be reduced, but it also lowers the environmental benefits of the importing country. One price instrument (tariff) and two quantity instruments (discount, quota) to prevent the exporting country from issuing more permits are examined. Each instrument restricts trade and alters the terms of trade for the two countries. The importing country (and regulator) prefers an import tariff and an import quota to a carbon discount. If the exporting country releases additional permits, the importing country should not try to keep total emissions constant, as that would be ineffective and maybe even counterproductive. Instead, the importing country should aim to keep the total import constant; this would impose costs on the exporting country that are independent of the policy instrument; an import quota would be the cheapest option for the importing country. An import quota would also stress the idea of supplementary of the flexible mechanism as it increases the share of emissions reduced domestically. Compliance and liability issues constrain the market further. However, both the importing and the exporting country would prefer that the permit seller is liable in case of non-compliance, as sellers' liability would less constrain the market

  12. RCRA permitting strategies for the development of innovative technologies: Lessons from Hanford

    International Nuclear Information System (INIS)

    Gajewski, S.W.; Donaghue, J.F.

    1994-01-01

    The Hanford Site restoration is the largest waste cleanup operation in history. The Hanford plutonium production mission generated two-thirds of all the nuclear waste, by volume, in the Department of Energy (DOE) Complex. Cleanup challenges include not only large stored volumes of radioactive, hazardous, and mixed waste, but contaminated soil and groundwater and scores of major structures slated for decontamination, decommissioning, and demolition. DOE and its contractors will need to invent the technology required to do the job on a timetable driven by negotiated milestones, public concerns, and budgetary constraints. This paper will discuss the effort at Hanford to develop an integrated, streamlined strategy for compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in the conduct of research, development, and demonstration (RD ampersand D) of innovative cleanup technologies. The aspects that will be discussed include the following: the genesis of the RD ampersand D permitting challenge at Hanford; permitting options in the existing regulatory framework; regulatory options that offered the best fit for Hanford RD ampersand D activities, and the problems associated with them; and conclusions and recommendations made to regulatory bodies

  13. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  14. Federal and state permits required to open a new uranium mine with comments on uranium development on Indian reservations

    International Nuclear Information System (INIS)

    Root, T.E.; Whisler, J.S.

    1976-01-01

    Three federally related problems are discussed: the environmental impact statement, water discharge permits, and access. A cookbook approach to the permitting process is given as it exists in Wyoming, Utah, New Mexico, and Arizona. The question of jurisdiction is dealt with by using a case study approach to illustrate how jurisdiction bears on uranium development on Indian reservations

  15. 78 FR 1759 - Notice of Approval of Clean Air Act Outer Continental Shelf Minor Source/Title V Minor Permit...

    Science.gov (United States)

    2013-01-09

    ... documents relevant to the above-referenced permits are available for public inspection during normal... permit decisions, to the extent it is available, may be sought by filing a petition for review in the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR PART 52 [FRL-9767-5] Notice of Approval of Clean Air Act...

  16. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  17. 1998 Annual Study Report. Surveys on seeds for global environmental technologies, including those for energy saving; 1998 nendo chosa hokokusho. Sho energy nado chikyu kankyo taisaku gijutsu no seeds ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The energy-saving and other global environmental technologies are surveyed by collecting relevant information from various institutes, both abroad and domestic, to contribute to development of ceramic gas turbines. USA has announced a climate change plan, based on the five principles, to promote utilization of high-efficiency technologies and development of new clean technologies. UK is promoting to improve energy efficiency, along with liberalization of its energy markets. Germany concentrates its efforts in the 'Program for Energy Research and Energy Technologies.' France places emphasis on prevention of air pollution and rational use of energy. The R and D trends at public institutes, e.g., universities, for global environmental technologies are surveyed, from which a total of 14 themes are extracted as the seed technologies. At the same time, a total of 9 techniques potentially applicable to the seeds are extracted by mainly reviewing JICST and patent information, and assessed. The R&D trends of the IPCC-related researchers are also surveyed, but provide no theme directly applicable to the seeds. Most of the related themes at the private and public institutes surveyed, both domestic and abroad, are concentrated on carbon dioxide. (NEDO)

  18. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  19. 75 FR 58372 - Notice of Intent To Prepare an Environmental Impact Statement for Skokomish General Investigation...

    Science.gov (United States)

    2010-09-24

    ... entire drainage basin, including the estuary at Annas Bay. The river collects drainage from an approximate 240 square mile drainage basin, and eventually flows into southern Hood Canal, an arm of Puget... alternatives, mitigation measures, probable significant environmental impacts, and permits or other approvals...

  20. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  1. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  2. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... lithium battery that exceeds the net quantity weight restriction when transported by motor vehicle and... Dassault Falcon Jet Corp. Little Ferry, NJ May 13, 2013. To modify the special permit to add an additional...

  3. 32 CFR 935.11 - Permits.

    Science.gov (United States)

    2010-07-01

    ... shall be issued under other authority that is inconsistent with this part. The Commander may issue.... (b) To the extent it is not inconsistent with this part, any permit or registration issued pursuant...

  4. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  5. 50 CFR 660.707 - Permits.

    Science.gov (United States)

    2010-10-01

    ... or downloaded from the Southwest Region home page (http://swr.nmfs.noaa.gov/permits.htm) to apply for... the vessel is fishing for, taking, retaining, possessing, or landing HMS shoreward of the outer...

  6. 77 FR 4271 - Special Permit Marking Removal

    Science.gov (United States)

    2012-01-27

    ... the logistical and cost concerns regarding the ability of the railroad industry to comply with the... incorporating the applicable GRL Special Permits into the HMR (and FRA's subsequent approval notice) those...

  7. Effect of zero discharge permits on oil and gas operations

    International Nuclear Information System (INIS)

    Higdon, G.D.

    1994-01-01

    This paper examines one of the more prominent effects of the Clean Water Act (CWA) upon oil and gas operations. To that end, the paper begins with a general discussion of the regulatory background and permitting framework which serves as the foundation for water pollution control. From this discussion, the paper will then move into a discussion of particular permit provisions which govern the discharge of wastes generated from oil and gas operations. Upon discussing these provisions, the paper will then discuss potential enforcement options available to the Environmental Protection Agency (EPA) to address violations of the regulations and permits it has issued to implement the CWA. In that regard, the paper will also discuss some recent enforcement theories advocated by the EPA which may have significant impacts upon oil and gas operators and the way in which they conduct their operations. In light of some of these recent enforcement activities, the paper will close with a discussion of the implications of the theories of liability espoused by EPA and steps which oil and gas operators may taking in response to the positions assumed by EPA

  8. Conference report : PERM-IT '97

    International Nuclear Information System (INIS)

    Smyth, V.; Yeabsley, A.

    1997-01-01

    The PERM-IT conference (Physics Engineering Radiation Medicine with a special emphasis on Information Technology) which was held in Adelaide with an attendance of about 250, was the joint annual meeting of the Australasian Radiation Protection Society, the Australasian College of Physical Scientists and Engineers in Medicine, the College of Biomedical Engineers of the Institution of Engineers Australia and the Society for Medical and Biological Engineering. The program was organised with three parallel sessions running most of the time, with plenary sessions for items of particular interest featuring keynote speakers from around the world. Attendance at this conference allowed the opportunity to meet with colleagues in other regulatory agencies, and Australia has a number of these. But what should be done about radioactive waste? A universal groan is raised by radiation protection regulatory authority staff at this question. Plans are afoot to develop a whole of Australia radioactive waste repository with both burial and above ground facilities. An announcement on the suitability of various sites in order of preference is expected, but in the meantime, facilities are fragemented. Discussions were held with staff from the radiation standards section of the Australian Radiation Laboratory who face similar problems to NRL including reducing funding, the move to cost recovery, and working towards quality managment accreditation. Plans for a further intercomparison between the Australian and NZ primary standards are being made. (author)

  9. A strategy for addressing environmental regulations in the 1990s

    International Nuclear Information System (INIS)

    Mason, P.F.

    1990-01-01

    In 1988, an assessment was made concerning environmental regulatory trends and the electric power industry and an eight point environmental permitting strategy and approach was outlined in 1989 to handle the environmental approvals for new power plants in the 1990s. The main features of the suggested strategy included: (1) development of a comprehensive and coordinated approach to environmental permitting, (2) inclusion of all levels of government and appropriate jurisdictions, (3) disclosure of considerably more information than previously required, (4) maintenance of records to allow traceability of issues, technical data, and environmental licensing positions, (5) development of legal and technical reviews and develop positions on a wider range of environmental issues, (6) encourage the development of both a global as well as a project-specific perspective, (7) review of existing plants and projects against contemporary environmental trends and patterns to assure continued compliance, and (8) prepare to entertain more project or facility reviews, audits, inspections and independent reviews. Since then this strategy and approach has been tested on several power and non-power projects and has proven to be a viable and constructive approach to the problem of environmental regulation. This paper summarizes the main features of this strategy and reviews the results of its application to these various projects and reviews its applicability to non-utility power projects

  10. 75 FR 47825 - Emergency Exemption; Issuance of Emergency Permit to Rehabilitate Sea Turtles Affected by the...

    Science.gov (United States)

    2010-08-09

    ...] Emergency Exemption; Issuance of Emergency Permit to Rehabilitate Sea Turtles Affected by the Deepwater... threaten the Gulf of Mexico environment and its inhabitants, including five sea turtle species. We, the U.S...) permit, to aid sea turtles affected by the oil spill. ADDRESSES: Documents and other information...

  11. 77 FR 46514 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-03

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... a permit to export the sport-hunted trophy of one male Addax (Addax nasomaculatus) culled from a... permit to export the sport-hunted trophy of one male Addax (Addax nasomaculatus) culled from a captive...

  12. 77 FR 22604 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-04-16

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... zoological exhibition. Multiple Applicants The following applicants each request a permit to import the sport... requesting no changes to his permit but an extension of time to allow him to complete a study to archive and...

  13. 40 CFR 60.4122 - Information requirements for Hg budget permit applications.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Information requirements for Hg budget... requirements for Hg budget permit applications. A complete Hg Budget permit application shall include the following elements concerning the Hg Budget source for which the application is submitted, in a format...

  14. 77 FR 12286 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Science.gov (United States)

    2012-02-29

    ..., pollution prevention, water quality-based requirements, inspections, corrective action, and permit... industry on December 1, 2009. The permit also includes new water quality-based requirements for... Mexico, Indian Country Lands, Puerto Rico, Washington, DC, and U.S. territories and protectorates. DATES...

  15. New seismograph includes filters

    Energy Technology Data Exchange (ETDEWEB)

    1979-11-02

    The new Nimbus ES-1210 multichannel signal enhancement seismograph from EG and G geometrics has recently been redesigned to include multimode signal fillers on each amplifier. The ES-1210F is a shallow exploration seismograph for near subsurface exploration such as in depth-to-bedrock, geological hazard location, mineral exploration, and landslide investigations.

  16. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

  17. Analytic device including nanostructures

    KAUST Repository

    Di Fabrizio, Enzo M.; Fratalocchi, Andrea; Totero Gongora, Juan Sebastian; Coluccio, Maria Laura; Candeloro, Patrizio; Cuda, Gianni

    2015-01-01

    A device for detecting an analyte in a sample comprising: an array including a plurality of pixels, each pixel including a nanochain comprising: a first nanostructure, a second nanostructure, and a third nanostructure, wherein size of the first nanostructure is larger than that of the second nanostructure, and size of the second nanostructure is larger than that of the third nanostructure, and wherein the first nanostructure, the second nanostructure, and the third nanostructure are positioned on a substrate such that when the nanochain is excited by an energy, an optical field between the second nanostructure and the third nanostructure is stronger than an optical field between the first nanostructure and the second nanostructure, wherein the array is configured to receive a sample; and a detector arranged to collect spectral data from a plurality of pixels of the array.

  18. Saskatchewan resources. [including uranium

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The production of chemicals and minerals for the chemical industry in Saskatchewan are featured, with some discussion of resource taxation. The commodities mentioned include potash, fatty amines, uranium, heavy oil, sodium sulfate, chlorine, sodium hydroxide, sodium chlorate and bentonite. Following the successful outcome of the Cluff Lake inquiry, the uranium industry is booming. Some developments and production figures for Gulf Minerals, Amok, Cenex and Eldorado are mentioned.

  19. Environmental assessmental, geothermal energy, Heber geothermal binary-cycle demonstration project: Imperial County, California

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The proposed design, construction, and operation of a commercial-scale (45 MWe net) binary-cycle geothermal demonstration power plant are described using the liquid-dominated geothermal resource at Heber, Imperial County, California. The following are included in the environmental assessment: a description of the affected environment, potential environmental consequences of the proposed action, mitigation measures and monitoring plans, possible future developmental activities at the Heber anomaly, and regulations and permit requirements. (MHR)

  20. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  1. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  2. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  3. Fiscal 2000 achievement report. Development of comprehensive technologies for environmental conservation including prevention of global warming by the carbonization of wood, etc.; 2000 nendo jumoku nado no tanka ni yoru ondanka boshinado fukugo kankyo taisaku gijutsu no kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Efforts are exerted to develop new technologies whereby carbon dioxide is absorbed by and fixed in rapidly growing trees. The trees are felled and subjected to high-efficiency carbonization, and the thus-obtained carbonized material is used for environmental purification or the like and then buried in the ground. Studies are under way to find out if the cycle (operations) may be organized into an industry. Activities are conducted in the five fields of (1) carbonized materials, (2) carbonization, (3), industrial use of charcoal, (4) stabilization of charcoal, and (5) reports on surveys (mainly overseas). In field (2), following an introduction consisting of the carbonization mechanism and the definition of terms, surveys are conducted of the existence of carbonizable resources in Japan, distribution channels of imported charcoal and activated charcoal in Japan, various carbonization apparatuses, carbonization equipment incorporated into gasifying fusion furnaces, carbonization furnace as a system, and the trends of development of pyroligneous acid and development of its use. In field (3), studies are made on its use in industries, on its application to agriculture, forestry, and livestock industry, and on the utilization of its electromagnetic properties. (NEDO)

  4. Integrating decision support tools and environmental information systems: a case study on the Province of Milan

    International Nuclear Information System (INIS)

    Bagli, S.; Pistocchi, A.; Mazzoli, P.; Valentini, P.

    2006-01-01

    The paper demonstrates an application of advanced decision support tools within the framework of the environmental information system of the Province of Milan. These tools include environmental simulation models, multi criteria analysis, risk analysis and environmental accounting for marketable emission permits. After describing the general structure of the system, three demonstrational case studies are introduced concerning: groundwater pollution management; atmospheric pollution management; urban environmental quality perception and management. In the conclusion, potential use of tools like the ones implemented by the province of Milan within the framework of Local Agenda 21 processes is recalled [it

  5. Probabilistic production simulation including CHP plants

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, H.V.; Palsson, H.; Ravn, H.F.

    1997-04-01

    A probabilistic production simulation method is presented for an energy system containing combined heat and power plants. The method permits incorporation of stochastic failures (forced outages) of the plants and is well suited for analysis of the dimensioning of the system, that is, for finding the appropriate types and capacities of production plants in relation to expansion planning. The method is in the tradition of similar approaches for the analysis of power systems, based on the load duration curve. The present method extends on this by considering a two-dimensional load duration curve where the two dimensions represent heat and power. The method permits the analysis of a combined heat and power system which includes all the basic relevant types of plants, viz., condensing plants, back pressure plants, extraction plants and heat plants. The focus of the method is on the situation where the heat side has priority. This implies that on the power side there may be imbalances between demand and production. The method permits quantification of the expected power overflow, the expected unserviced power demand, and the expected unserviced heat demand. It is shown that a discretization method as well as double Fourier series may be applied in algorithms based on the method. (au) 1 tab., 28 ills., 21 refs.

  6. Detecting inter-aquifer leakage in areas with limited data using hydraulics and multiple environmental tracers, including 4He, 36Cl/Cl, 14C and 87Sr/86Sr

    Science.gov (United States)

    Priestley, Stacey C.; Wohling, Daniel L.; Keppel, Mark N.; Post, Vincent E. A.; Love, Andrew J.; Shand, Paul; Tyroller, Lina; Kipfer, Rolf

    2017-11-01

    The investigation of regionally extensive groundwater systems in remote areas is hindered by a shortage of data due to a sparse observation network, which limits our understanding of the hydrogeological processes in arid regions. The study used a multidisciplinary approach to determine hydraulic connectivity between the Great Artesian Basin (GAB) and the underlying Arckaringa Basin in the desert region of Central Australia. In order to manage the impacts of groundwater abstraction from the Arckaringa Basin, it is vital to understand its connectivity with the GAB (upper aquifer), as the latter supports local pastoral stations and groundwater-dependent springs with unique endemic flora and fauna. The study is based on the collation of available geological information, a detailed analysis of hydraulic data, and data on environmental tracers. Enhanced inter-aquifer leakage in the centre of the study area was identified, as well as recharge to the GAB from ephemeral rivers and waterholes. Throughout the rest of the study area, inter-aquifer leakage is likely controlled by diffuse inter-aquifer leakage, but the coarse spatial resolution means that the presence of additional enhanced inter-aquifer leakage sites cannot be excluded. This study makes the case that a multi-tracer approach along with groundwater hydraulics and geology provides a tool-set to investigate enhanced inter-aquifer leakage even in a groundwater basin with a paucity of data. A particular problem encountered in this study was the ambiguous interpretation of different age tracers, which is attributed to diffusive transport across flow paths caused by low recharge rates.

  7. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  8. Environmental implications

    International Nuclear Information System (INIS)

    Clark, K.

    1997-01-01

    The environmental concerns typical of the Canadian Arctic and the Beaufort Sea, which impacted on oil and gas exploration were discussed. Environmental regulations and legislation in existence were explained. Most regulations required submission of permit applications that among other things, described the type of equipment to be used and the time and duration of the use. Companies also had to demonstrate that they had the capability to deal with oil spill scenarios. If an oil spill had a significant effect on the numbers of animals, the Inuit would have to be compensated. According to members of the native population, much damage was done initially to wildlife habitats and population, although this improved somewhat later as regulations concerning seismic and explosive activities were strengthened and technology improved, producing fewer harmful environmental impacts. All in all, activity in the Beaufort Sea did not result in any major environmental disasters, but there were many disturbances in the seafloor, permafrost and ice dynamics, as well as an increase in ambient noise levels which resulted in behavioural changes in the organisms close to the drilling activities. 19 figs

  9. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  10. Being Included and Excluded

    DEFF Research Database (Denmark)

    Korzenevica, Marina

    2016-01-01

    Following the civil war of 1996–2006, there was a dramatic increase in the labor mobility of young men and the inclusion of young women in formal education, which led to the transformation of the political landscape of rural Nepal. Mobility and schooling represent a level of prestige that rural...... politics. It analyzes how formal education and mobility either challenge or reinforce traditional gendered norms which dictate a lowly position for young married women in the household and their absence from community politics. The article concludes that women are simultaneously excluded and included from...... community politics. On the one hand, their mobility and decision-making powers decrease with the increase in the labor mobility of men and their newly gained education is politically devalued when compared to the informal education that men gain through mobility, but on the other hand, schooling strengthens...

  11. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  12. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  13. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  14. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  15. Application of Clean Water (CWA) Section 404 compensatory wetland mitigation under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)

    International Nuclear Information System (INIS)

    Abbott, D.J.; Straub, C.A.

    1994-01-01

    Pursuant to Section 404 of the Clean Water Act (CWA), activities resulting in the discharge of dredge or fill material into waters of the US, including wetlands, require permit authorization from the US Army Corps of Engineers (ACOE). As part of the Section 404 permitting process, compensatory wetland mitigation in the form of wetland enhancement, restoration, or construction may be required to off-set impacts sustained under a Section 404 permit. Under normal circumstances, compensatory mitigation is a relatively straight forward process; however, issues associated with mitigation become more complex at sites undergoing remediation under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), because on-site response/remedial actions involving dredged and fill material are not subject to the formal Section 404 permitting process. These actions are conducted in accordance with the substantive permitting requirements of the ACOE's Nationwide and individual permitting programs. Wetland mitigatory requirements are determined through application of the US Environmental Protection Agency's (USEPA's) 040(b) (1) Guidelines promulgated in 40 CFR Part 230 and are implemented through compliance with substantive permitting requirements during the conduct of response/remedial actions. A programmatic approach for implementing wetland mitigatory requirements is being developed at a former US Department of Energy (DOE) uranium refinery undergoing CERCLA remediation in southwestern Ohio. The approach is designed to define the regulatory mechanism that will be used to integrate CWA driven wetland mitigatory requirements into the CERCLA process

  16. (Environmental technology)

    Energy Technology Data Exchange (ETDEWEB)

    Boston, H.L.

    1990-10-12

    The traveler participated in a conference on environmental technology in Paris, sponsored by the US Embassy-Paris, US Environmental Protection Agency (EPA), the French Environmental Ministry, and others. The traveler sat on a panel for environmental aspects of energy technology and made a presentation on the potential contributions of Oak Ridge National Laboratory (ORNL) to a planned French-American Environmental Technologies Institute in Chattanooga, Tennessee, and Evry, France. This institute would provide opportunities for international cooperation on environmental issues and technology transfer related to environmental protection, monitoring, and restoration at US Department of Energy (DOE) facilities. The traveler also attended the Fourth International Conference on Environmental Contamination in Barcelona. Conference topics included environmental chemistry, land disposal of wastes, treatment of toxic wastes, micropollutants, trace organics, artificial radionuclides in the environment, and the use biomonitoring and biosystems for environmental assessment. The traveler presented a paper on The Fate of Radionuclides in Sewage Sludge Applied to Land.'' Those findings corresponded well with results from studies addressing the fate of fallout radionuclides from the Chernobyl nuclear accident. There was an exchange of new information on a number of topics of interest to DOE waste management and environmental restoration needs.

  17. Tradeable CO2 emission permits for cost-effective control of global warming

    International Nuclear Information System (INIS)

    Kosobud, R.F.; South, D.W.; Daly, T.A.; Quinn, K.G.

    1991-01-01

    Many current global warming mitigation policy proposals call for large, near-term reductions in CO 2 emissions, thereby entailing high initial carbon emission tax rates or permit prices. This paper claims that these high initial tax rates or permit prices are not cost-effective in achieving the desired degree of climate change control. A cost-effective permit system is proposed and described that, under certain assumptions, would allow markets to optimally lead permit prices along a gradually increasing trajectory over tie. This price path presents the Hotelling result and would ease the abrupt, inefficient, and costly adjustments imposed on the fossil fuel and other industries in current proposals. This finding is demonstrated using the Argonne Model, a linear programming energy- environmental-economic model that allows for intertemporal optimization of consumer energy well-being. 12 refs., 3 figs., 1 tab

  18. 1997 LMITCO Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, B.; Street, L.; Wilhelmsen, R.

    1998-09-01

    This report describes the calendar year 1997 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs and compares 1997 data with program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standard, and to ensure protection of human health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends indicating a loss of control or unplanned releases from facility operations. With the exception of one nitrogen sample in the disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond, compliance with permits and applicable regulations was achieved. Data collected by the Environmental Monitoring Program demonstrate that public health and the environment were protected.

  19. Environmental Restoration

    Energy Technology Data Exchange (ETDEWEB)

    Zeevaert, T.; Vanmarcke, H

    1998-07-01

    The objectives of SCK-CEN's programme on environmental restoration are (1) to optimize and validate models for the impact assessment from environmental, radioactive contaminations, including waste disposal or discharge; (2) to support the policy of national authorities for public health and radioactive waste management. Progress and achievements in 1997 are reported.

  20. 75 FR 19987 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-04-16

    ... applied for scientific research permits to conduct certain activities with endangered species under the...) within Arizona. Permit TE-178778 Applicant: Marks Lab of Aquatic Ecology, Flagstaff, Arizona. Applicant...

  1. Tracking environmental monitoring data using EDRIS

    International Nuclear Information System (INIS)

    Engelder, P.R.

    1992-01-01

    For 10 years, operating contractors at the US Department of Energy Grand Junction Projects Office (GJPO) manually compiled and tracked environmental monitoring data collected at the GJPO and for the Monticello Remedial Action Project in Monticello, Utah. The Environmental Data Retrieval and Information System (EDRIS), which uses an ORACLE database, helps maintain compliance and facilitates the tracking and comparison of these data with the applicable or relevant and appropriate requirements (ARARs) such as CERCLA, RCRA and the state regulations. The design of EDRIS allows unrestricted input and verification of all aspects of a complete environmental monitoring database package. This database catalogs the following components: groundwater chemistry, surface water chemistry, air particulate chemistry, soil chemistry, sewer effluent chemistry, storm run-off chemistry, the quantity of suspended air particulates less than 10 μ in size, meteorological data, radon data, environmental radiation data, water levels, information on well installations and completions, status of all applicable permits and ARARs. Macros enable the transfer of information to EDRIS in an electronic format to maintain the integrity of the data. In addition to data entry and verification, EDRIS capabilities allow unrestricted retrieval of data through menus designed to permit various types of comparisons, including an examination of historical and current data against the most restrictive current standard. One example of the flexibility of EDRIS is the ability to compare the data with selected standards. This comparison is accomplished by performing applicable calculations to the data as they are retrieved from the database

  2. Environmental protection

    International Nuclear Information System (INIS)

    Hull, A.P.

    1979-01-01

    Environmental Studies and Internal Dosimetry projects include: Environmental Protection; 1977 Environmental Monitoring Report; Sewage Sludge Disposal on the Sanitary Landfill; Radiological Analyses of Marshall Islands Environmental Samples, 1974 to 1976; External Radiation Survey and Dose Predictions for Rongelap, Utirik, Rongerik, Ailuk, and Wotje Atolls; Marshall Islands - Diet and Life Style Study; Dose Reassessment for Populations on Rongelap and Utirik Following Exposure to Fallout from BRAVO Incident (March 1, 1954); Whole Body Counting Results from 1974 to 1979 for Bikini Island Residents; Dietary Radioactivity Intake from Bioassay Data, a Model Applied to 137 Cs Intake by Bikini Island Residents; and External Exposure Measurements at Bikini Atoll

  3. Environmental physics

    CERN Document Server

    Smith, Clare

    2001-01-01

    Environmental Physics is a comprehensive introduction to the physical concepts underlying environmental science. The importance and relevance of physics is emphasised by its application to real environmental problems with a wide range of case studies. Applications included cover energy use and production, global climate, the physics of living things, radioactivity, environmental remote sensing, noise pollution and the physics of the Earth. The book makes the subject accessible to those with little physics background, keeping mathematical treatment straightforward. The text is lively and informative, and is supplemented by numerous illustrations, photos, tables of useful data, and a glossary of key terms.

  4. Environmental surveillance at Los Alamos during 1981

    International Nuclear Information System (INIS)

    1982-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos National Laboratory during 1981. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of data for 1981 are included on penetrating radiation; on the chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soil and sediments, and food; and on the quantities of airborne emissions and liquid effluents. Comparisons with appropriate standards and regulations or with background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are insignificant and are not considered hazardous to the population of the area. Results of several special studies describe some unique environmental conditions in the Laboratory environs

  5. Environmental surveillance at Los Alamos during 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1979. Routine monitoring for radiation and radioactive or chemical substances was conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1979 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs.

  6. Environmental surveillance at Los Alamos during 1980

    International Nuclear Information System (INIS)

    1981-04-01

    Documentation is presented for the environmental surveillance program during 1980. Routine monitoring for radiation and radioactive or chemical substances is conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1980 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-Laboratory sources provide a basis for concluding that environmental effects attributable to Laboratory operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies describe some unique environmental conditions in the Laboratory environs

  7. Environmental surveillance at Los Alamos during 1979

    International Nuclear Information System (INIS)

    1980-04-01

    This report documents the environmental surveillance program conducted by the Los Alamos Scientific Laboratory (LASL) in 1979. Routine monitoring for radiation and radioactive or chemical substances was conducted on the Laboratory site and in the surrounding region to determine compliance with appropriate standards and permit early identification of possible undesirable trends. Results and interpretation of the data for 1979 on penetrating radiation, chemical and radiochemical quality of ambient air, surface and ground water, municipal water supply, soils and sediments, food, and airborne and liquid effluents are included. Comparisons with appropriate standards and regulations or with background levels from natural or other non-LASL sources provide a basis for concluding that environmental effects attributable to LASL operations are minor and cannot be considered likely to result in any hazard to the population of the area. Results of several special studies provide documentation of some unique environmental conditions in the LASL environs

  8. 1990 Environmental Monitoring Report, Sandia National Laboratories, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    Hwang, S.; Yeager, G.; Wolff, T.; Parsons, A.; Dionne, D.; Massey, C.; Schwartz, B.; Fish, J.; Thompson, D.; Goodrich, M.

    1991-05-01

    This 1990 report contains monitoring data from routine radiological and nonradiological environmental surveillance activities. Summaries of significant environmental compliance programs in progress such as National Environmental Policy Act (NEPA) documentation, environmental permits, environmental restoration, and various waste management programs for Sandia National Laboratories in Albuquerque (SNL, Albuquerque) are included. The maximum offsite dose impact was calculated to be 2.0 x 10 -3 mrem. The total 50-mile population received a collective dose of 0.82 person-rem during 1990 from SNL, Albuquerque, operations. As in the previous year, the 1990 SNL operations had no adverse impact on the general public or on the environment. This report is prepared for the US Department of Energy in compliance with DOE Order 5400.1. 97 refs., 30 figs., 137 tabs

  9. 1993 Site environmental report Sandia National Laboratories, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    Culp, T.A.; Cheng, C.F.; Cox, W.; Durand, N.; Irwin, M.; Jones, A.; Lauffer, F.; Lincoln, M.; McClellan, Y.; Molley, K.

    1994-11-01

    This 1993 report contains monitoring data from routine radiological and nonradiological environmental surveillance activities. Summaries of significant environmental compliance programs in progress, such as National Environmental Policy Act documentation, environmental permits, environmental restoration, and various waste management programs for Sandia National Laboratories in Albuquerque, New Mexico, are included. The maximum offsite dose impact was calculated to be 0.0016 millirem. The total population within a 50-mile (80 kilometer) radius of Sandia National Laboratories/New Mexico received an estimated collective dose of 0.027 person-rem during 1993 from the laboratories operations, As in the previous year, the 1993 operations at Sandia National Laboratories/New Mexico had no discernible impact on the general public or on the environment. This report is prepared for the U.S. Department of Energy in compliance with DOE Order 5400.1

  10. 1994 Site Environmental Report Sandia National Laboratories Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    Shyr, L.J.; Wiggins, T.; White, B.B.

    1995-09-01

    This 1994 report contains data from routine radiological and nonradiological environmental monitoring activities. Summaries of significant environmental compliance programs in progress, such as National Environmental Policy Act documentation, environmental permits, environmental restoration, and various waste management programs for Sandia National Laboratories in Albuquerque, New Mexico, are included. The maximum off-site dose impact from air emissions was calculated to be 1.5 x 10 -4 millirem. The total population within a 50-mile radius of Sandia National Laboratories/New Mexico received an estimated collective dose of 0.012 person-rem during 1994 from the laboratories' operations. This report is prepared for the U.S. Department of Energy in compliance with DOE Order 5400.1

  11. Brookhaven National Laboratory site environmental report for calendar year 1989

    International Nuclear Information System (INIS)

    Miltenberger, R.P.; Royce, B.A.; Chalasani, S.S.; Morganelli, D.; Naidu, J.R.

    1990-12-01

    The environmental monitoring program is conducted by the Environmental Protection Section of the Safety and Environmental Protection (S ampersand EP) Division to determine whether operation of BNL facilities have met the applicable environmental standards and effluent control requirements. This program includes monitoring for both radiological and nonradiological parameters. This report summarizes the data for the external radiation levels; radioactivity in air, rain, potable water, surface water, ground water, soil, vegetation, and aquatic biota; water quality, metals, organics and petroleum products in ground water, surface water and potable water. Analytical results are reviewed by the S ampersand EP staff and when required by permit conditions are transmitted to the appropriate regulatory agencies. The data were evaluated using the appropriate environmental regulatory criteria. Detailed data for the calendar year 1989 are presented. 27 figs

  12. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  13. MOS modeling hierarchy including radiation effects

    International Nuclear Information System (INIS)

    Alexander, D.R.; Turfler, R.M.

    1975-01-01

    A hierarchy of modeling procedures has been developed for MOS transistors, circuit blocks, and integrated circuits which include the effects of total dose radiation and photocurrent response. The models were developed for use with the SCEPTRE circuit analysis program, but the techniques are suitable for other modern computer aided analysis programs. The modeling hierarchy permits the designer or analyst to select the level of modeling complexity consistent with circuit size, parametric information, and accuracy requirements. Improvements have been made in the implementation of important second order effects in the transistor MOS model, in the definition of MOS building block models, and in the development of composite terminal models for MOS integrated circuits

  14. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)

  15. Can a carbon permit system reduce Spanish unemployment?

    International Nuclear Information System (INIS)

    Faehn, Taran; Gomez-Plana, Antonio G.; Kverndokk, Snorre

    2009-01-01

    This paper analyses the impact of carbon policy on unemployment in Spain and whether recycling the public revenues earned from permit auctions can alleviate this problem. While Spain's deviation from the European Union's intermediate emission goals is more serious than most other member countries' unemployment in Spain is also well above average for the European Union. We use a computable general equilibrium model that includes unemployment in the markets for unskilled and skilled labour. We find that introducing carbon permits does not aggravate Spanish unemployment. In fact, if supplied with revenue recycling schemes, unemployment rates may actually fall. Contrary to other European studies, we find that the best option is to reduce payroll taxes on relatively skilled types of labour. This reform is successful in both increasing labour demand and dampening the supply response to rising wages. However, while all of the recycling schemes generate dividends in terms of aggregate welfare, none entirely offsets the abatement costs. (author)

  16. 76 FR 9772 - Adequacy of Arizona Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-02-22

    ... Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of... Region IX is proposing to approve a modification to Arizona's municipal solid waste landfill (MSWLF... final rule amending the municipal solid waste landfill criteria at 40 CFR 258.4 to allow for RD&D...

  17. 78 FR 5350 - Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2013-01-25

    ...] Adequacy of Massachusetts Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On December 7, 2012 Massachusetts submitted an application to...

  18. 40 CFR 147.2923 - Corrective action for wells authorized by permit.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Corrective action for wells authorized by permit. 147.2923 Section 147.2923 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... knowledge that wells within the zone of endangering influence will not serve as conduits for fluid movement...

  19. 40 CFR 158.2080 - Experimental use permit data requirements-biochemical pesticides.

    Science.gov (United States)

    2010-07-01

    ... requirements-biochemical pesticides. 158.2080 Section 158.2080 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR PESTICIDES Biochemical Pesticides § 158.2080 Experimental use permit data requirements—biochemical pesticides. (a) Sections 158.2081...

  20. 40 CFR 158.2170 - Experimental use permit data requirements-microbial pesticides.

    Science.gov (United States)

    2010-07-01

    ... requirements-microbial pesticides. 158.2170 Section 158.2170 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS DATA REQUIREMENTS FOR PESTICIDES Microbial Pesticides § 158.2170 Experimental use permit data requirements—microbial pesticides. (a) For all microbial pesticides. (1) The...

  1. 78 FR 20316 - Final Issuance of General NPDES Permits (GP) for Small Suction Dredges in Idaho

    Science.gov (United States)

    2013-04-04

    ... System (NPDES) General Permit (IDG-37-0000) to placer mining operations in Idaho for small suction... Small Suction Dredges in Idaho AGENCY: Environmental Protection Agency, Region 10. ACTION: Final notice... significant economic impact on a substantial number of small entities.'' EPA has concluded that NPDES general...

  2. 75 FR 69990 - Application for Presidential Permit; Northern Pass Transmission LLC

    Science.gov (United States)

    2010-11-16

    ... Utilities, 107 Selden Street, Berlin, CT 06037 AND Mary Anne Sullivan, Hogan Lovells, LLP, 555 13th St., NW., Washington, DC 20004. Before a Presidential permit may be issued or amended, DOE must determine that the... impacts of the proposed project pursuant to the National Environmental Policy Act of 1969, determines the...

  3. 75 FR 29991 - Marine Mammals; receipt of application for permit amendment

    Science.gov (United States)

    2010-05-28

    ...; phone (978)281-9300; fax (978)281-9333; and Southeast Region, NMFS, 263 13th Avenue South, Saint... delphinids such as long-finned pilot whales (Globicephala melas), although other small cetacean species may... expiration date of the permit. In compliance with the National Environmental Policy Act of 1969 (42 U.S.C...

  4. 78 FR 20073 - Adequacy of Oregon's Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2013-04-03

    ...] Adequacy of Oregon's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection Agency... Oregon's approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final regulations... waste landfills by approved states. On June 14, 2012, Oregon submitted an application to EPA Region 10...

  5. 75 FR 53268 - Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2010-08-31

    ...] Adequacy of New Hampshire Municipal Solid Waste Landfill Permit Program AGENCY: Environmental Protection... modification of its approved Municipal Solid Waste Landfill Program. On March 22, 2004, EPA issued final... solid waste landfills by approved states. On June 28, 2010 New Hampshire submitted an application to EPA...

  6. 77 FR 47380 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges From...

    Science.gov (United States)

    2012-08-08

    ... test fluids, sanitary waste, domestic waste and miscellaneous discharges is authorized. More stringent... permit. Major changes also include definition of ``operator'', acute toxicity test for produced water, spill prevention best management practices, and electronic reporting requirements. To obtain discharge...

  7. Hanford facility dangerous waste permit application, 616 Nonradioactive Dangerous Waste Storage Facility. Revision 2A

    International Nuclear Information System (INIS)

    Bowman, R.C.

    1994-04-01

    This permit application for the 616 Nonradioactive Dangerous Waste Storage Facility consists for 15 chapters. Topics of discussion include the following: facility description and general provisions; waste characteristics; process information; personnel training; reporting and record keeping; and certification

  8. 76 FR 10623 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2011-02-25

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  9. 77 FR 58405 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-20

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... species. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  10. 76 FR 30386 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2011-05-25

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Applicant: Mary Hunt, Edmore, MI; PRT-42976A The applicant requests a permit to import a sport-hunted trophy...

  11. 77 FR 12870 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2012-03-02

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... propagation. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  12. 75 FR 62139 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2010-10-07

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  13. 76 FR 48880 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-09

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  14. 78 FR 37562 - Endangered Species; Marine Mammals; Receipt of Applications for Permit

    Science.gov (United States)

    2013-06-21

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  15. 26 CFR 1.401(l)-5 - Overall permitted disparity limits.

    Science.gov (United States)

    2010-04-01

    ... permitted disparity limits. (a) Introduction—(1) In general. The maximum excess allowance and maximum offset... Commissioner considers appropriate. Additional rules may include (without being limited to) rules for computing...

  16. Environmental process improvement feasibility study and demonstration program

    Science.gov (United States)

    Martin, Rodger L.

    1994-01-01

    This report is the final product of an environmental study conducted by Western Commercial Space Center, Inc. under contract to Tennessee-Calspan Center for Space Transportation and Applied Research. The purpose of this investigation is to accurately document the current environmental and permitting processes associated with commercial space launch activity at Vandenberg AFB, and make recommendations to streamline those processes. The particular areas of interest focus on: identifying applicable Federal, state, and local laws, Department of Defense directives, and Air force regulations; defining the environmental process on Vandenberg AFB and how it relates with other agencies, including Federal and state regulatory agencies; and defining the air quality permit process. Study investigation results are applied to an example Pilot Space Launch Vehicle (PSLV) planning to launch from Vandenberg AFB. The PSLV space hardware is analyzed with respect to environmental and permitting issues associated with vehicle processing, facilities required (existing or new), and launch. The PSLV verified the earlier findings of the study and gave insight into streamlining recommendations.

  17. Environmental monitoring program of CDTN

    International Nuclear Information System (INIS)

    Ferreira, E.G.

    1985-09-01

    This environmental monitoring program of CDTN aim to do a survey that permit to verify if the radioactive wastes release by CDTN agree with basic rudiments of radioprotection, evaluate the environmental impact, verify the adjustment of using proceedings to effluents control, to evaluate the maximum radiation doses that public persons will be able to get yearly. (C.M.) [pt

  18. Environmental protection by cost minimization: Least Cost Planning for traffic. Includes a guide for the application in local communities; Umweltentlastung durch Kostenminimierung: Least Cost Planning im Verkehr. Mit Leitfaden fuer die Anwendung in Kommunen

    Energy Technology Data Exchange (ETDEWEB)

    Bracher, T.; Diegmann, V.; Eckart, C.F.; Liwicki, M.; Lobenberg, G.; Wetzel, C. [Gesellschaft fuer Informatik, Verkehrs- und Umweltplanung mbH (IVU), Berlin (Germany); Bergmann, M.; Uricher, A.; Lueers, A. [Oeko-Institut, Inst. fuer Angewandte Oekologie e.V., Freiburg im Breisgau (Germany); Becker, U.; Karl, G.; Karl, B.; Voellings, A. [Technische Univ. Dresden (Germany). Lehrstuhl fuer Verkehrsoekologie

    1999-08-01

    An intermodal approach for the evaluation of transportation services on the municipal level was developed. Both non-motorised and motorised transportation were included. The approach aims at helping communities to provide an economically and ecologically viable transport policy. Least Cost Transportation Planning (LCTP) was developed to transfer the successful concept of Least Cost Planning from the energy sector to transportation. The conclusion from an analysis of LCTP literature and present evaluation methods was that an improved approach should be intermodal and integrate users, public bodies and transport companies as well as all planning sectors. An approach was developed firstly to identify and clarify transportation expenditures and incomes of a city within a year, and secondly for the evaluation of planning alternatives. This was illustrated for the access system of an industrial area with adjacent railway services in the town of Freiburg. Three alternatives were compared: the extension of a tramway line, the upgrading of the present bus system, and the development of a service and bicycle provision concept for rail stations and companies. Besides income and expenditure for each alternative, the effects on transport demand, the impact on air pollution and noise and on space consumption were presented. As a result, the bicycle concept is in most items better than its alternatives. The final report has three volumes and there is an extra guideline for implementing the method within municipalities. It includes a set of excel sheet tables for an easy application (all in German). (orig.) [German] Fuer die Verkehrsplanung wurde ein verkehrstraegeruebergreifendes Bewertungsverfahren fuer Kommunen entwickelt, das motorisierte und nicht motorisierte Verkehrstraeger einbezieht. Das Verfahren soll Gemeinden unterstuetzen, eine oekonomische und oekologisch vertraegliche Verkehrspolitik zu verfolgen. Least Cost Transportation Planning (LCTP) zielt darauf ab, das fuer

  19. 27 CFR 19.157 - Operating permits.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Qualification of Distilled Spirits Plants § 19.157... file an application for registration under § 19.151 shall make application for and obtain an operating permit before commencing any of the following operations: (1) Distilling for industrial use. (2...

  20. 75 FR 54649 - Endangered Wildlife; Permits

    Science.gov (United States)

    2010-09-08

    ...-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to take (capture...-listed Drosophila species on the island of Kauai in the State of Hawaii for the purpose of enhancing its... in the State of Hawaii: Astelia waialealae (painiu), Canavalia napaliensis (awikiwiki), Chamaesyce...

  1. 15 CFR 5.4 - Permits.

    Science.gov (United States)

    2010-01-01

    ... standards relating to appearance, safety, sanitation, maintenance, and efficiency of operation. Due regard... the Government and prospective patrons of the stand. (f) The permit shall describe the location of the stand proper and the location of any vending machines which are operated in conjunction with it. ...

  2. 9 CFR 93.802 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... CONVEYANCE AND SHIPPING CONTAINERS Elephants, Hippopotami, Rhinoceroses, and Tapirs § 93.802 Import permit. (a) An elephant, hippopotamus, rhinoceros, or tapir shall not be imported into the United States... export an elephant, hippopotamus, rhinoceros, or tapir to the United States; (2) The name and address of...

  3. 19 CFR 12.107 - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... TREASURY SPECIAL CLASSES OF MERCHANDISE Pre-Columbian Monumental and Architectural Sculpture and Murals § 12.107 Importations permitted. Pre-Columbian monumental or architectural sculpture or mural for which... sculpture or mural, in a form acceptable to the Secretary, certifying that such exportation was not in...

  4. 78 FR 43268 - Special Permit Applications

    Science.gov (United States)

    2013-07-19

    ... an amount qualifying as hazardous material. (modes 1, 2, 3, 4) 15860-N......... Apple Inc. 49 CFR To... strength stiffness. 13581-M......... Bengal Products 49 CFR To modify the Inc. Baton 173.306(a)(3). special............ Carleton 49 CFR 173.302a To modify the Technologies special permit to Inc. (Former change a drawing Grantee...

  5. 50 CFR 648.4 - Vessel permits.

    Science.gov (United States)

    2010-10-01

    ... carrying passengers for hire. (8) Atlantic bluefish vessels. (i) Commercial. Any vessel of the United... lands Atlantic bluefish in or from the EEZ in excess of the recreational possession limit specified at § 648.164 must have been issued and carry on board a valid commercial bluefish vessel permit. (ii) Party...

  6. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  7. 2015 Site Environmental Report Fernald Preserve

    Energy Technology Data Exchange (ETDEWEB)

    Hertel, Bill [Navarro Research and Engineering, Oak Ridge, TN (United States); Hooten, Gwen [US Department of Energy, Washington, DC (United States)

    2016-05-01

    The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater. During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site’s National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.

  8. 224-T Transuranic Waste Storage and Assay Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-01-01

    Westinghouse Hanford Company is a major contractor to the US Department of Energy Richland Field Office and serves as cooperator of the 224-T Transuranic Waste Storage and Assay Facility, the storage unit addressed in this permit application. At the time of submission of this portion of the Hanford Facility. Dangerous Waste Permit Application covering the 224-T Transuranic Waste Storage and Assay Facility, many issues identified in comments to the draft Hanford Facility Dangerous Waste Permit remain unresolved. This permit application reflects the positions taken by the US Department of Energy, Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application (Revision 0) consists of both a Part A and Part B permit application. An explanation of the Part A revisions associated with this unit, including the Part A revision currently in effect, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987). The 224-T Transuranic Waste Storage and Assay Facility Dangerous Waste Permit Application contains information current as of March 1, 1992

  9. Research report for fiscal 1998 including researches into global environmental problems. Business report on the promotion of interaction of scientists over environmental problems in the Asia-Pacific region; 1998 nendo Asia/Taiheiyo chiiki kankyo mondai kenkyusha koryu sokushin jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    Global environmental problems are growing quite serious in developing countries, yet they are requested to properly deal with them without making light of sustainable development, for which international cooperation and diffusion of technologies for the development of environmental technologies are mandatory. Japan, utilizing what it learned from pollution within in the past and making the best use of its technologies and knowledge for environmental improvement in developing countries in Asia, has been hosting since fiscal 1997 a function of Environmental Technology Research Network in the Asia-Pacific Region function. In fiscal 1998, a fifth international symposium was convened at Science City Center at the foot of Mt. Suzuka on November 26 and 27. The central theme was the development of environmental technologies and international cooperation for developing nations, and the event attracted 180 participants from inside Japan and abroad. A number of concrete themes came out of working groups on water quality, air quality, and energy/waste, which concerned the drafting of propositions for international collaborative researches. As for researches abroad, four typical Malaysian institutes were visited. (NEDO)

  10. 1998 Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    L. V. Street

    1999-09-01

    This report describes the calendar year 1998 compliance monitoring and environmental surveillance activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1998 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The INEEL complied with permits and applicable regulations, with the exception of nitrogen samples in a disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond. Data collected by the Environmental Monitoring Program demonstrate that the public health and environment were protected.

  11. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  12. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  13. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  14. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  15. Joint Implementation, Clean Development Mechanism and Tradable Permits

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, L.; Rose Olsen, K.

    2000-06-01

    This report deals with international environmental instruments aimed at a cost-effective reduction of greenhouse gas emissions. More precisely the instruments mentioned in the Kyoto Protocol, namely Joint Implementation (JI), the Clean Development Mechanism (CDM) and Tradable Permits (TP). The report describes the background for the international co-operation on reducing the greenhouse gases and the background for the instruments. How the instruments work in theory and what the practical problems may be. What agents' incentives are when they engage in JI or CDM, and how the initiation of the instruments can be organised. The institutional frameworks for JI, CDM and TP are discussed. The report describes how the Kyoto instruments and the Kyoto commitments interact with other instruments and describe distributive effects between countries. It is analysed how the use of CDM may influence the developing countries incentives to participate in the coalition of committed countries. In the concluding chapter some recommendations on the use of JI, TP and CDM are given. The recommendations are a kind of dialog with especially the Norwegian and Swedish reports on tradable permits. Some of the issues described in this main report are analysed in separate working papers. The working papers are collected in an appendix to the main report. (au)

  16. Joint Implementation, Clean Development Mechanism and Tradable Permits

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, L; Rose Olsen, K

    2000-06-01

    This report deals with international environmental instruments aimed at a cost-effective reduction of greenhouse gas emissions. More precisely the instruments mentioned in the Kyoto Protocol, namely Joint Implementation (JI), the Clean Development Mechanism (CDM) and Tradable Permits (TP). The report describes the background for the international co-operation on reducing the greenhouse gases and the background for the instruments. How the instruments work in theory and what the practical problems may be. What agents' incentives are when they engage in JI or CDM, and how the initiation of the instruments can be organised. The institutional frameworks for JI, CDM and TP are discussed. The report describes how the Kyoto instruments and the Kyoto commitments interact with other instruments and describe distributive effects between countries. It is analysed how the use of CDM may influence the developing countries incentives to participate in the coalition of committed countries. In the concluding chapter some recommendations on the use of JI, TP and CDM are given. The recommendations are a kind of dialog with especially the Norwegian and Swedish reports on tradable permits. Some of the issues described in this main report are analysed in separate working papers. The working papers are collected in an appendix to the main report. (au)

  17. Environmental assessment of the atlas bio-energy waste wood fluidized bed gasification power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Holzman, M.I.

    1995-08-01

    The Atlas Bio-Energy Corporation is proposing to develop and operate a 3 MW power plant in Brooklyn, New York that will produce electricity by gasification of waste wood and combustion of the produced low-Btu gas in a conventional package steam boiler coupled to a steam-electric generator. The objectives of this project were to assist Atlas in addressing the environmental permit requirements for the proposed power plant and to evaluate the environmental and economic impacts of the project compared to more conventional small power plants. The project`s goal was to help promote the commercialization of biomass gasification as an environmentally acceptable and economically attractive alternative to conventional wood combustion. The specific components of this research included: (1) Development of a permitting strategy plan; (2) Characterization of New York City waste wood; (3) Characterization of fluidized bed gasifier/boiler emissions; (4) Performance of an environmental impact analysis; (5) Preparation of an economic evaluation; and (6) Discussion of operational and maintenance concerns. The project is being performed in two phases. Phase I, which is the subject of this report, involves the environmental permitting and environmental/economic assessment of the project. Pending NYSERDA participation, Phase II will include development and implementation of a demonstration program to evaluate the environmental and economic impacts of the full-scale gasification project.

  18. A conceptual analysis of the application of tradable permits to biodiversity conservation.

    Science.gov (United States)

    Wissel, Silvia; Wätzold, Frank

    2010-04-01

    Tradable permits have been applied in many areas of environmental policy and may be a response to increasing calls for flexible conservation instruments that successfully conserve biodiversity while allowing for economic development. The idea behind applying tradable permits to conservation is that developers wishing to turn land to economic purposes, thereby destroying valuable habitat, may only do so if they submit a permit to the conservation agency showing that habitat of at least the equivalent ecological value is restored elsewhere. The developer himself does not need to carry out the restoration, but may buy a permit from a third party, thus allowing a market to emerge. Nevertheless, the application of tradable permits to biodiversity conservation is a complex issue because destroyed and restored habitats are likely to differ. There may be various trade-offs between the ecological requirements that destroyed and restored habitats be as similar as possible, and the need for a certain level of market activity to have a functioning trading system. The success of tradable permits as an instrument for reconciling the conflicts between economic development and conservation depends on the existence of certain economic, institutional, and ecological preconditions, for example, a functioning institutional framework, sufficient expert knowledge, and adequate monitoring and enforcement mechanisms.

  19. Early Site Permit Demonstration Program: Plant parameters envelope report

    International Nuclear Information System (INIS)

    1993-03-01

    The Early Site Permit (ESP) Demonstration Program is the nuclear industry's initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants

  20. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  1. Allocation of carbon permits within a country. A general equilibrium analysis of the United Kingdom

    International Nuclear Information System (INIS)

    Edwards, T.H.; Hutton, J.P.

    2001-01-01

    The Kyoto agreement includes international trade in carbon permits from 2008. We have used a CGE model to evaluate methods of allocating permits within the UK. Auctioning is broadly similar to a carbon tax, with revenues recycled to reduce other distortions. 'Grandfathering' some permits free to large firms would mean a loss of recycling and, possibly, give windfall profits to foreigners. Alternatively, regularly revised allocation, using 'best practice' estimates, would be similar to recycling revenue as an output subsidy. Such a system could allow much of the potential 'double dividend' to be realised, though an auction system might still be preferable

  2. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  3. Market Power in Laboratory Emission Permit Markets

    International Nuclear Information System (INIS)

    Godby, R.

    2002-01-01

    Many proposals suggesting the use of markets to control pollution assume markets will be competitive. When markets do not exhibit competitive characteristics, however, should they still be expected to result in efficiency improvement relative to traditional approaches? This paper employs experimental economic methods to examine the effect of market structure on the use of marketable emissions permits. Results indicate that in a market with one dominant firm and a number of fringe firms, strategic manipulation occurs repeatedly in the laboratory as predicted by market power models, undermining the allocative and dynamic efficiency benefits such markets offer. When firms compete in a downstream product market dominated by the same single firm, market efficiency can actually be reduced with the implementation of permit markets. Final market efficiencies reflect initial endowments and are influenced by competitive conditions elsewhere in the economy, indicating that policy-makers should carefully consider whether markets are appropriate in such circumstances

  4. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  5. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  6. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    This report is part of a dangerous waste permit application for the storage of wastes from the Purex process at Hanford. Appendices are presented on the following: construction drawings; HSW-5638, specifications for disposal facility for failed equipment, Project CA-1513-A; HWS-8262, specification for Purex equipment disposal, Project CGC 964; storage tunnel checklist; classification of residual tank heels in Purex storage tunnels; emergency plan for Purex facility; training course descriptions; and the Purex storage tunnels engineering study

  7. Environmental protection

    International Nuclear Information System (INIS)

    Klinda, J.; Lieskovska, Z.

    1998-01-01

    In this chapter environmental protection in the Slovak Republic in 1997 are reviewed. The economics of environmental protection, state budget, Slovak state environmental fund, economic instruments, environmental laws, environmental impact assessment, environmental management systems, and environmental education are presented

  8. Recycled water reuse permit renewal application for the materials and fuels complex industrial waste ditch and industrial waste pond

    Energy Technology Data Exchange (ETDEWEB)

    Name, No

    2014-10-01

    This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in the initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.

  9. Environmental protection

    International Nuclear Information System (INIS)

    Martinez, A.S.

    1987-01-01

    The question of environment protection related to the use of nuclear energy aiming to power generation, based on the harmonic concept of economic and industrial development, preserving the environment, is discussed. A brief study of environmental impacts for some energy sources, including nuclear energy, to present the systems of a nuclear power plant which aim at environmental protection, is done. (M.C.K.) [pt

  10. 36 CFR 1.6 - Permits.

    Science.gov (United States)

    2010-07-01

    ..., environmental or scenic values, natural or cultural resources, scientific research, implementation of management responsibilities, proper allocation and use of facilities, or the avoidance of conflict among visitor use...

  11. City of Richland 300 Area industrial wastewater permit application

    International Nuclear Information System (INIS)

    1995-05-01

    Battelle-Pacific Northwest Labs and Westinghouse Hanford Co. are responsible for operating most of the facilities within the 300 Area; other contractors are also involved. The document gives briefly water/wastewater data: water sources, water usage, water discharge/loss, NPDES permit status, plant sewer outlets size and flow, etc. The document also includes the following attachments: 300 Area building list, Oct. 1993-Oct. 1994 300 Area water balance, waste shipments for CY 1994, complete chemical listing, sanitary sewer sampling results (12/19/94, 1/18/95, 1/15/95), and priority pollutant listings

  12. USDA Forest Service, Rocky Mountain Region PSD Permit Completeness Determination

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  13. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    International Nuclear Information System (INIS)

    1993-12-01

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment

  14. 40 CFR 122.33 - If I am an operator of a regulated small MS4, how do I apply for an NPDES permit and when do I...

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Application and Special NPDES Program... 40 Protection of Environment 21 2010-07-01 2010-07-01 false If I am an operator of a regulated...

  15. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil

  16. TANK FARM ENVIRONMENTAL REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment, The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations/Projects or that Operations Projects have direct impact upon. This document does not supercede or replace any Department of Energy (DOE) Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or Notice of Construction for an inclusive listing of requirements

  17. ENVIRONMENTAL SPECIFICATION REQUIREMENTS

    International Nuclear Information System (INIS)

    TIFFT, S.R.

    2003-01-01

    Through regulations, permitting or binding negotiations, Regulators establish requirements, limits, permit conditions and Notice of Construction (NOC) conditions with which the Office of River Protection (ORP) and the Tank Farm Contractor (TFC) must comply. Operating Specifications are technical limits which are set on a process to prevent injury to personnel, or damage to the facility or environment. The main purpose of this document is to provide specification limits and recovery actions for the TFC Environmental Surveillance Program at the Hanford Site. Specification limits are given for monitoring frequencies and permissible variation of readings from an established baseline or previous reading. The requirements in this document are driven by environmental considerations and data analysis issues, rather than facility design or personnel safety issues. This document is applicable to all single-shell tank (SST) and double-shell tank (DST) waste tanks, and the associated catch tanks and receiver tanks, and transfer systems. This Tank Farm Environmental Specifications Document (ESD) implements environmental-regulatory limits on the configuration and operation of the Hanford Tank Farms facility that have been established by Regulators. This ESD contains specific field operational limits and recovery actions for compliance with airborne effluent regulations and agreements, liquid effluents regulations and agreements, and environmental tank system requirements. The scope of this ESD is limited to conditions that have direct impact on Operations Projects or that Operations/Projects have direct impact upon. This document does not supercede or replace any DOE Orders, regulatory permits, notices of construction, or Regulatory agency agreements binding on the ORP or the TFC. Refer to the appropriate regulation, permit, or NOC for an inclusive listing of requirements

  18. Economic approach of the environment and environmental conservation

    International Nuclear Information System (INIS)

    Verbruggen, A.

    2008-01-01

    This book takes the non-economist by the hand in a step-by-step economic approach of environmental issues and how to handle them. Two chapters provide an introduction to the concepts of the economy, chapter six in decision theory. In the first chapter, the economist discovers a broader vision by testing the economic approach to insights from other disciplines. Chapter 4 explains how economic reasoning can contribute tot environmental protection in practice. The consideration of the costs and benefits of environmental protection indicates objectives that must be pursued for the community. The conflict between private and public interest forces policy makers to get and maintain the numerous polluters focused on environmental protection. Suitable instruments are discussed in chapter five, including criteria for choice and an in-depth study of the economic instruments levies and tradable emission permits. The EU Emission trading Scheme is used as reference. [mk] [nl

  19. 1991 Environmental monitoring report Sandia National Laboratories, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    Culp, T.; Cox, W.; Hwang, S.; Jones, A.; Longley, S.; Parsons, A.; Wolff, T.; Fish, J.; Ward, S.

    1992-11-01

    This 1991 report contains monitoring data from routine radiological and nonradiological environmental surveillance activities. Summaries of significant environmental compliance programs in progress such as National Environmental Policy Act (NEPA) documentation, environmental permits, envirorunental restoration (ER), and various waste management programs for Sandia National Laboratories in Albuquerque (SNL, Albuquerque) are included. The maximum offsite dose impact was calculated to be 1.3 x 10 -3 mrem. The total population within a 50-mile radius of SNL, Albuquerque, received a collective dose of 0.53 person-rem during 1991 from SNL, Albuquerque, operations. As in the previous year, the 1991 operations at SNL, Albuquerque, had no discernible impact on the general public or on the environment

  20. 1992 Environmental monitoring report, Sandia National Laboratories, Albuquerque, New Mexico

    International Nuclear Information System (INIS)

    Culp, T.; Cox, W.; Hwang, H.; Irwin, M.; Jones, A.; Matz, B.; Molley, K.; Rhodes, W.; Stermer, D.; Wolff, T.

    1993-09-01

    This 1992 report contains monitoring data from routine radiological and nonradiological environmental surveillance activities. summaries of significant environmental compliance programs in progress, such as National Environmental Policy Act documentation, environmental permits, envirorunental restoration, and various waste management programs for Sandia National Laboratories in Albuquerque, New Mexico, are included. The maximum offsite dose impact was calculated to be 0.0034 millirem. The total population within a 50-mile radius of Sandia National Laboratories/New Mexico received an estimated collective dose of 0.019 person-rem during 1992 from the laboratories' operations. As in the previous year, the 1992 operations at Sandia National Laboratories/New Mexico had no discernible impact on the general public or on the environment