  1. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  2. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  3. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  4. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  5. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  6. An overview of the Environmental Monitoring Computer Automation Project

    International Nuclear Information System (INIS)

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS

  7. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  8. Household environmental monitoring project, volume I : main report, volume 2 : appendices

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, J.; Goemans, M.; Goemans, P.C.; Wisniowski, A. [Jane Thompson Architect, Ottawa, ON (Canada); Fugler, D. [Canada Mortgage and Housing Corp., Ottawa, ON (Canada)

    2006-01-15

    Environmentally sustainable behaviour can be motivated by providing homeowners with a clear picture of their environmental impact, tangible reasons for improvement, and tailored solutions. This report presented the results of a study that established a study group of 20 households in an 85-year old community near downtown Ottawa, Ontario to test the above hypothesis. Each household completed surveys about environmental attitudes and household practices. Each household also tracked home heating, electricity and water consumption, and vehicle usage and waste generation over a monitoring period of one week. This report described the study in detail and presented the research plan and methods. It provided a review of related literature, including motivational techniques for encouraging sustainable behaviour; environmental monitoring tools including design tools, global impact assessment tools, federal environmental reduction tools and strategies; analyses of environmentally sustainable projects; and resource conservation techniques and manuals. The report also discussed the selection of the study group; development of monitoring method and forms; household monitoring; household assessment and reporting; community initiatives; and assessment of following year results. It was concluded that the research technique successfully produced reductions in environmental impact among the study group. refs., tabs., figs.

  9. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  10. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  11. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  12. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  13. 1982 environmental-monitoring program report for the West Valley Demonstration Project site

    International Nuclear Information System (INIS)

    1983-05-01

    This report is prepared and submitted in accordance with the requirements of DOE Order 5484.1 and presents environmental monitoring program data collected at the West Valley Demonstration Project (WVDP) site from February 26, 1982, through December 31, 1982. The WVDP objective is to solidify approximately 600,000 gallons of high-level liquid radioactive waste stored at the former Nuclear Fuel Services reprocessing facility at West Valley, New York. Nuclear Fuel Services conducted an environmental monitoring program in accordance with Nuclear Regulatory Commission requirements which were appropriate for shutdown maintenance operations conducted at the site. That program was embraced by West Valley Nuclear Services Company (WVNS) at the time of transition (February 26, 1982) and will be modified to provide a comprehensive monitoring program in preparation for waste solidification operations scheduled for startup in June 1988. As such, the data presented in this report is considered preoperational in nature in accordance with DOE Order 5484.1, Chapter III, Paragraph 1. The environmental monitoring program planned for the operating phase of the project will be fully implemented by fiscal year 1985 and will provide at least two years of preoperational data prior to startup

  14. Applicability of the "Frame of Reference" approach for environmental monitoring of offshore renewable energy projects.

    Science.gov (United States)

    Garel, Erwan; Rey, Cibran Camba; Ferreira, Oscar; van Koningsveld, Mark

    2014-08-01

    This paper assesses the applicability of the Frame of Reference (FoR) approach for the environmental monitoring of large-scale offshore Marine Renewable Energy (MRE) projects. The focus is on projects harvesting energy from winds, waves and currents. Environmental concerns induced by MRE projects are reported based on a classification scheme identifying stressors, receptors, effects and impacts. Although the potential effects of stressors on most receptors are identified, there are large knowledge gaps regarding the corresponding (positive and negative) impacts. In that context, the development of offshore MRE requires the implementation of fit-for-purpose monitoring activities aimed at environmental protection and knowledge development. Taking European legislation as an example, it is suggested to adopt standardized monitoring protocols for the enhanced usage and utility of environmental indicators. Towards this objective, the use of the FoR approach is advocated since it provides guidance for the definition and use of coherent set of environmental state indicators. After a description of this framework, various examples of applications are provided considering a virtual MRE project located in European waters. Finally, some conclusions and recommendations are provided for the successful implementation of the FoR approach and for future studies. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Comfort monitoring? Environmental assessment follow-up under community-industry negotiated environmental agreements

    International Nuclear Information System (INIS)

    Noble, Bram; Birk, Jasmine

    2011-01-01

    Negotiated environmental agreements are becoming common practice in the mining industry. In principle, negotiated environmental agreements are said to respond to many of the shortcomings of environmental impact assessment by providing for improved follow-up of project impacts through, among other things, data provision, engaging stakeholders in the monitoring and management of project impacts, and building capacity at the local level to deal with project-induced environmental change. In practice, however, little is known about the efficacy of follow-up under negotiated environmental agreements between proponents and communities and the demonstrated value added to project impact management. This paper examines follow-up practice under negotiated environmental agreements with a view to understanding whether and how community-based monitoring under privatized agreements actually contributes to improved follow-up and impact management. Based on lessons emerging from recent experiences with environmental agreements in Canada's uranium industry, we show that follow-up under negotiated agreements may be described as 'comfort monitoring'. While such monitoring does improve community-industry relations and enhance corporate image, it does little to support effects-based management. If follow-up under negotiated agreements is to be credible over the long term, there is a need to ensure that monitoring results are useful for, and integrated with, regulatory-based monitoring and project impact management practices.

  16. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-01-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl 4 ) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  17. Environmental monitoring for the hot dry rock geothermal energy development project. Annual report, July 1975--June 1976

    Energy Technology Data Exchange (ETDEWEB)

    Pettitt, R.A. (comp.)

    1976-09-01

    The objectives of this environmental monitoring report are to provide a brief conceptual and historical summary of the Hot Dry Rock Geothermal Project, a brief overview of the environmental monitoring responsibilities and activities of the Los Alamos Scientific Laboratory, and descriptions of the studies, problems, and results obtained from the various monitoring programs. Included are descriptions of the work that has been done in three major monitoring areas: (1) water quality, both surface and subsurface; (2) seismicity, with a discussion of the monitoring strategy of regional, local, and close-in detection networks; and (3) climatology. The purpose of these programs is to record baseline data, define potential effects from the project activities, and determine and record any impacts that may occur.

  18. Environmental Monitoring - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Davy, Thomas (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2009-02-15

    The purpose of this report is to describe the environmental monitoring measures performed for the Lillgrund Offshore Wind Farm and to summarize the results and conclusions. Construction work started in 2006 and the plant was energized in December 2007. At the time of construction Lillgrund was the third largest wind farm offshore in the world and the first large offshore wind farm in Sweden. The purpose of the environmental monitoring is to ensure that there are no negative impacts on the environment stemming from construction of the Lillgrund wind farm as well as to ensure that the conditions stated by the authorities and the Company's commitments are met. The aim is also to collect more information and knowledge on the possible environmental impact for future offshore wind farm projects. For the Lillgrund project, all monitoring programs were included in one document, Monitoring Program - Lillgrund. It was included as part of the procedures to ensure that the Swedish legal requirements on operators control were followed. The authorities approved the document before construction started. The monitoring measures performed during the construction phase included: - A feedback and monitoring program on dredging and spillage; - A feedback and monitoring program on flora and fauna; - Studies and inspections of the refilling and re-establishment of the sea bottom; - Procedure for operators control. The mean measured sediment spillage, as part of the monitoring program on dredging and spillage, varied between 4.6 - 4.8% depending on dredger used. The maximum value allowed by the conditions is 5%. In general, the calculated values for suspended material were limited and the critical value of 0.01 kg/m3 was exceeded only in minor areas for a very limited time. No corrective actions were required. The deposition of sediment was very low and even at the most effected sites it was only just over 1 mm. The largest dredging volumes were for the foundation work, in total 82

  19. U-tube based near-surface environmental monitoring in the Shenhua carbon dioxide capture and storage (CCS) project.

    Science.gov (United States)

    Li, Qi; Song, Ranran; Shi, Hui; Ma, Jianli; Liu, Xuehao; Li, Xiaochun

    2018-04-01

    The CO 2 injected into deep formations during implementation of carbon dioxide (CO 2 ) capture and storage (CCS) technology may leak and migrate into shallow aquifers or ground surfaces through a variety of pathways over a long period. The leaked CO 2 can threaten shallow environments as well as human health. Therefore, almost all monitoring programs for CCS projects around the world contain near-surface monitoring. This paper presents a U-tube based near-surface monitoring technology focusing on its first application in the Shenhua CCS demonstration project, located in the Ordos Basin, Inner Mongolia, China. First, background information on the site monitoring program of the Shenhua CCS demonstration project was provided. Then, the principle of fluid sampling and the monitoring methods were summarized for the U-tube sampler system, and the monitoring data were analyzed in detail. The U-tube based monitoring results showed that the U-tube sampler system is accurate, flexible, and representative of the subsurface fluid sampling process. The monitoring indicators for the subsurface water and soil gas at the Shenhua CCS site indicate good stratification characteristics. The concentration level of each monitoring indicator decreases with increasing depth. Finally, the significance of this near-surface environmental monitoring technology for CO 2 leakage assessments was preliminarily confirmed at the Shenhua CCS site. The application potential of the U-tube based monitoring technology was also demonstrated during the subsurface environmental monitoring of other CCS projects.

  20. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  1. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  2. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  3. Nearshore and offshore environmental effects monitoring at the Sable Offshore Energy project

    International Nuclear Information System (INIS)

    Hurley, G. V.

    2000-01-01

    A monitoring program to determine whether any temporary or permanent environmental perturbations may be attributable to the Sable offshore gas pipeline project as it approaches landfall at Goldboro through an outer bay is discussed, This nearshore region is an active fishing region for the residents of Goldboro, hence the concern about possible contamination. The monitoring project began with a baseline study, followed by monitoring the construction and the recovery period following construction, to ensure that any persistent changes to the nearshore aquatic environment were documented. The monitoring study included representatives of the fishing community to ensure that concerns are addressed early and on a continuing basis. At various phases of the project water properties,sediment modelling, the effects of construction on sea bottom conditions, benthic biota and cultivated mussels, water quality, phytoplankton, and resuspension of toxic cysts, terns and other seabirds were studied. Monitoring programs were also established for sea urchins and mussels, two important commercial species. Commercial-sized sea urchins showed a decrease of 60 per cent between 1998 and 1999 (i.e. the construction period). Recovery of sea urchin population in the immediate trench region will be the special focus of the post-construction monitoring phase. Mussel spat settlement and mussel tissue condition, lobster trapping, water properties, and bird behaviour showed no measurable changes during construction monitoring. In addition to these studies there is an ongoing offshore monitoring program in effect by Sable Offshore Energy Inc., put in place as a condition of approval of its Development Plan by the Canada-Nova Scotia Offshore Petroleum Board. This program monitors attributes such as water quality, suspended particulate matter in the benthic boundary layer, sediment quality, the benthic habitat and megafaunal community, shellfish body burden and taint, marine mammals and seabirds

  4. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  5. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  6. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  7. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  8. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  9. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  10. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  11. High altitude environmental monitoring: the SHARE project and CEOP-HE

    Science.gov (United States)

    Tartari, G.

    2009-04-01

    Mountain areas above 2,500 m a.s.l. constitute about 25% of the Earth's surface and play a fundamental role in the global water balance, while influencing global climate and atmospheric circulation systems. Several millions, including lowlanders, are directly affected by the impacts of climate change on glaciers and water resource distribution. Mountains and high altitude plateaus are subject to the highest rate of temperature increase (e.g., Tibetan Plateau) and are recognized as particularly vulnerable to the effects of climate change. In spite of this, the number of permanent monitoring sites in the major environmental networks decreases with altitude. On a sample of two hundred high altitude automatic weather stations located above 2,500 m a.s.l., less than 20% are over 4,000 m, while there are only 24 stations in the world that could be considered "complete" high altitude observatories. Furthermore, entire mountain areas are left uncovered, creating significant data gaps which make reliable modelling and forecasting nearly impossible. In response to these problems, Ev-K2-CNR has developed the project SHARE (Stations at High Altitude for Research on the Environment) with the support of the Italian government and in collaboration with UNEP. This integrated environmental monitoring and research project aims to improve knowledge on the local, regional and global consequences of climate change in mountain regions and on the influence of high elevations on climate, atmospheric circulation and hydrology. SHARE today boasts a network of 13 permanent monitoring stations between 2,165 m and 8,000 m. Affiliated researchers have produced over 150 scientific publications in atmospheric sciences, meteorology and climate, glaciology, limnology and paleolimnology and geophysics. SHARE network data is also contributed to international programs (UNEP-ABC, WMO-GAW, WCRP-GEWEX-CEOP, NASA-AERONET, ILTER, EU-EUSAAR, EU-ACCENT). Within this context, the CEOP-High Elevations (CEOP

  12. Continuing pollution from the Rum Jungle U-Cu project: A critical evaluation of environmental monitoring and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Mudd, Gavin M., E-mail: Gavin.Mudd@eng.monash.edu.a [Environmental Engineering, Dept of Civil Engineering, Monash University, Clayton, VIC 3800 (Australia); Patterson, James [Environmental Engineering Consultant, Sydney, NSW (Australia)

    2010-05-15

    The former Rum Jungle uranium-copper project, Australia, is an internationally important case study on environmental pollution from and rehabilitation of mining. The Rum Jungle mining project is briefly reviewed, followed by a critical evaluation of monitoring data and pollution loads prior to and after rehabilitation - leading to the conclusion that rehabilitation has clearly failed the test of time after just two decades. The most critical findings are the need to understand pollution cycles holistically, and designing monitoring regimes to match, explicit inclusion of radiological criteria (lacking in original planning), and finally the need to set targets based on environmental criteria. Two examples include polluted groundwater which was excluded from rehabilitation and the poor design, construction and/or performance of engineered soil covers - both leading to increasing acid drainage impacts on the Finniss River. The critical review therefore presents a valuable case study of the environmental performance of uranium mine site rehabilitation. - The Rum Jungle U-Cu project underwent extensive rehabilitation in the 1980's, however, it remains a major cause of pollution to the Finniss River.

  13. Environmental monitoring at Olympic Dam

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The environmental management and protection program at the Olympic Dam uranium/copper/gold project, Roxby Downs, South Australia, monitors eight major environmental parameters - meteorology, vegetation, mine site rehabilitation, fauna, terrain, soil salinity, hydrogeology and well fields. It came into effect with the approval of the South Australian Government in March 1987. The Great Artesian Basin, one of the world's greatest artesian basins, is the source of the water supply for the project

  14. Life Support Systems: Environmental Monitoring

    Data.gov (United States)

    National Aeronautics and Space Administration — The Advanced Exploration Systems (AES) Life Support Systems project Environmental Monitoring (EM) systems task objectives are to develop and demonstrate onboard...

  15. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  16. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  17. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  18. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials

  19. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  20. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  1. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  2. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  3. Survey monitoring of environmental radioactivity in Daejeon area

    Energy Technology Data Exchange (ETDEWEB)

    Jun, Jae Shik.; Noh, Hyung Ah [Taejon Radiation Monitoring Station, Daejeon (Korea, Republic of)

    2000-12-15

    Systematic understanding of the distribution of environmental radioactivity and radiation level in Taejon, including Chungchung area, in normal circumstance, and rapid detection of unusual variation of the radiation level in emergency situation thereby ensure public safety are the objectives of this project to be carried out. This report summarizes and interprets environmental radiation/radioactivity monitoring data obtained at Taejon Radiation Monitoring Station in 2000. In conclusion, the natural environmental radiation level in Taejon area has been preserved as usual and no significant artificial enhancement in environmental radioactivity was observed during the course of this survey and monitoring period.

  4. Survey monitoring of environmental radioactivity in Daejeon area

    Energy Technology Data Exchange (ETDEWEB)

    Jun, Jae Sik; Noh, Hyung Ah [Daejon Radiation Monitoring Station, Daejeon (Korea, Republic of)

    2001-12-15

    Systematic understanding of the distribution of environmental radioactivity and radiation level in Daejeon, including Chungchung area, in normal circumstance, and rapid detection of unusual variation of the radiation level in emergency situation thereby ensure public safety are the objectives of this project to be carried out. This report summarizes and interprets environmental radiation/radioactivity monitoring data obtained at Daejeon Radiation Monitoring Station in 2001. In conclusion, the natural environmental radiation level in Daejeon area has been preserved as usual and no significant artificial enhancement in environmental radioactivity was observed during the course of this survey and monitoring period.

  5. Survey monitoring of environmental radioactivity in Daejeon area

    Energy Technology Data Exchange (ETDEWEB)

    Jun, Jae Shik; Noh, Hyung Ah [Daejon Radiation Monitoring Station, Daejeon (Korea, Republic of)

    2002-12-15

    Systematic understanding of the distribution of environmental radioactivity and radiation level in Daejeon, including Chungchung area, in normal circumstance, and rapid detection of unusual variation of the radiation level in emergency situation thereby ensure public safety are the objectives of this project to be carried out. This report summarizes and interprets environmental radiation/radioactivity monitoring data obtained at Daejeon Radiation Monitoring Station in 2002. In conclusion, the natural environmental radiation level in Daejeon area has been preserved as usual and no significant artificial enhancement in environmental radioactivity was observed during the course of this survey and monitoring period.

  6. Survey monitoring of environmental radioactivity in Daejeon area

    Energy Technology Data Exchange (ETDEWEB)

    Jun, Jae Shik; Noh, Hyung Ah [Daejon Radiation Monitoring Station, Daejeon (Korea, Republic of)

    2003-12-15

    Systematic understanding of the distribution of environmental radioactivity and radiation level in Daejeon, including Chungchung area, in normal circumstance, and rapid detection of unusual variation of the radiation level in emergency situation thereby ensure public safety are the objectives of this project to be carried out. This report summarizes and interprets environmental radiation/radioactivity monitoring data obtained at Daejeon Radiation Monitoring Station in 2002. In conclusion, the natural environmental radiation level in Daejeon area has been preserved as usual and no significant artificial enhancement in environmental radioactivity was observed during the course of this survey and monitoring period.

  7. Survey monitoring of environmental radioactivity in Daejeon area

    International Nuclear Information System (INIS)

    Jun, J. S.; Kim, K. S.

    1998-01-01

    Systematic understanding of the distribution of environmental radioactivity and radiation level in Taejon, including Chungchung area, in normal circumstance, and rapid detection of unusual variation of the radiation level in emergency situation thereby ensure public safety are the objectives of this project to be carried out. This report summarizes and interprets environmental radiation/radioactivity monitoring data obtained at Taejon Radiation Monitoring Station in 1998. In conclusion, the natural environmental radiation level in Taejon area has been preserved as usual and no significant artificial enhancement in environmental radioactivity was observed during the course of this survey and monitoring period

  8. Survey monitoring of environmental radioactivity in Daejeon area

    International Nuclear Information System (INIS)

    Jun, Jae Sik; Noh, Hyung Ah

    2001-12-01

    Systematic understanding of the distribution of environmental radioactivity and radiation level in Daejeon, including Chungchung area, in normal circumstance, and rapid detection of unusual variation of the radiation level in emergency situation thereby ensure public safety are the objectives of this project to be carried out. This report summarizes and interprets environmental radiation/radioactivity monitoring data obtained at Daejeon Radiation Monitoring Station in 2001. In conclusion, the natural environmental radiation level in Daejeon area has been preserved as usual and no significant artificial enhancement in environmental radioactivity was observed during the course of this survey and monitoring period

  9. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  10. Recovery and evaluation of historical environmental monitoring data at Hanford

    International Nuclear Information System (INIS)

    Dirkes, R.L.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from the nuclear operations at the Hanford site since 1944. The Environmental Monitoring Data Task within HEDR is charged with assembling, evaluating, and summarizing key historical measurements of radionuclide concentrations in the environment on and around the Hanford site. The recovery and evaluation of historical environmental monitoring data are integral parts of the environmental dose reconstruction process. The data generated through historical environmental monitoring programs may be critical in the development of dose modeling codes and in performing a meaningful environmental pathway analysis. In addition, environmental monitoring data are essential in the verification of model calculations and in the validation of the model itself. The paper a task logic flowchart illustrating how the process evolves within the Environmental Monitoring Data Task and the interaction with other project tasks. The reconstruction of such data presents numerous challenges, many of which are not generally encountered in typical scientific studies. This paper discusses the process of reconstructing historical environmental monitoring data at Hanford. Several of the difficulties encountered during this process are presented. Items that may be beneficial and should be considered in performing such a task are identified

  11. Het Project Monitoring Risicofactoren en Gezondheid Nederland (MORGEN-project). Jaarverslag 1993

    NARCIS (Netherlands)

    Smit HA; Verschuren WMM; Bueno de Mesquita HB; Seidell JC; CCM

    1994-01-01

    The Monitoring Project on Risk Factors for Chronic Diseases (MORGEN-project) is conducted by the National Institute of Public Health and Environmental Protection (RIVM). Its general purpose is to determine the prevalence of risk factors for chronic diseases as well as the prevalence of some specific

  12. Chicago Clean Air, Clean Water Project: Environmental Monitoring for a Healthy, Sustainable Urban Future

    Energy Technology Data Exchange (ETDEWEB)

    none, none; Tuchman, Nancy [Institute of Environmental Sustainability (IES), Chicago, IL (United States)

    2015-11-11

    The U.S. Department of Energy awarded Loyola University Chicago and the Institute of Environmental Sustainability (IES) $486,000.00 for the proposal entitled “Chicago clean air, clean water project: Environmental monitoring for a healthy, sustainable urban future.” The project supported the purchase of analytical instruments for the development of an environmental analytical laboratory. The analytical laboratory is designed to support the testing of field water and soil samples for nutrients, industrial pollutants, heavy metals, and agricultural toxins, with special emphasis on testing Chicago regional soils and water affected by coal-based industry. Since the award was made in 2010, the IES has been launched (fall 2013), and the IES acquired a new state-of-the-art research and education facility on Loyola University Chicago’s Lakeshore campus. Two labs were included in the research and education facility. The second floor lab is the Ecology Laboratory where lab experiments and analyses are conducted on soil, plant, and water samples. The third floor lab is the Environmental Toxicology Lab where lab experiments on environmental toxins are conducted, as well as analytical tests conducted on water, soil, and plants. On the south end of the Environmental Toxicology Lab is the analytical instrumentation collection purchased from the present DOE grant, which is overseen by a full time Analytical Chemist (hired January 2016), who maintains the instruments, conducts analyses on samples, and helps to train faculty and undergraduate and graduate student researchers.

  13. Monitoring and Evaluation of Environmental Flow Prescriptions for Five Demonstration Sites of the Sustainable Rivers Project

    Science.gov (United States)

    Konrad, Christopher P.

    2010-01-01

    The Nature Conservancy has been working with U.S. Army Corps of Engineers (Corps) through the Sustainable Rivers Project (SRP) to modify operations of dams to achieve ecological objectives in addition to meeting the authorized purposes of the dams. Modifications to dam operations are specified in terms of environmental flow prescriptions that quantify the magnitude, duration, frequency, and seasonal timing of releases to achieve specific ecological outcomes. Outcomes of environmental flow prescriptions implemented from 2002 to 2008 have been monitored and evaluated at demonstration sites in five rivers: Green River, Kentucky; Savannah River, Georgia/South Carolina; Bill Williams River, Arizona; Big Cypress Creek, Texas; and Middle Fork Willamette River, Oregon. Monitoring and evaluation have been accomplished through collaborative partnerships of federal and state agencies, universities, and nongovernmental organizations.

  14. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  15. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  16. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  17. Environmental monitoring data around the Chernobyl nuclear power plant used in the cooperative research project between JAERI and CHESCIR (Ukraine). Cooperative research

    International Nuclear Information System (INIS)

    Ueno, Takashi; Matsunaga, Takeshi; Amano, Hikaru

    2003-01-01

    This report is a compilation of the shared data derived from the environmental monitoring by RADEK (The state Enterprise for Region Monitoring of Environment and Dosimetric Control of Ukraine) and the record of environmental characteristics derived from field observations during a research project (1992-1999) between JAERI (Japan Atomic Energy Research Institute) and CHESCIR (Chernobyl Science and Technology Centre for International Research). The compiled data in this report are especially related to one particular research subject (Subject-3) of the project on the migration of radionuclides released into the terrestrial and aquatic environments after a nuclear accident. The present report shows the basis of published works concerning Subject-3. (author)

  18. Survey monitoring of environmental radioactivity in Jeju area

    Energy Technology Data Exchange (ETDEWEB)

    U, Zang Kual; Kang, Tae Woo; Park, Won Pyo [Jeju National Univ., Jeju (Korea, Republic of)

    2003-12-15

    The project is carried out to monitor the change of environmental radioactivity in Jeju, and to provide a systematic data for radiation monitoring and counter measurement at a radiological emergency situation. Also the survey of natural environmental radioactivities in the samples was conducted to make the reliable data base for evaluation of internal exposure and environmental contamination of radiation. This report contains the data of gamma exposure rates and radioactivities of airborne dust, fallout, precipitation and tap water which were analyzed periodically by Jeju Regional Monitoring Station in 2002. Also it contains the data of natural radioactivity levels of food stuff such as agricultural and marine products, including drinking waters.

  19. Survey monitoring of environmental radioactivity in Jeju area

    Energy Technology Data Exchange (ETDEWEB)

    U, Z. K.; Oh, S. H. [Jeju National Univ., Jeju (Korea, Republic of)

    1998-01-15

    The project is carried out to monitor the change of environmental radioactivity in Jeju, and to provide a systematic data for radiation monitoring and counter measurement at a radiological emergency situation. Also the survey of natural environmental radioactivities in the samples was conducted to make the reliable data base for evaluation of internal exposure and environmental contamination of radiation. This report contains the data of gamma exposure rates and radioactivities of airborne dust, fallout, precipitation and tap water which were analyzed periodically by Jeju Regional Monitoring Station in 1997. Also it contains the data of natural radioactivity levels of food stuff such as agricultural and marine products, including drinking waters.

  20. Survey monitoring of environmental radioactivity in Jeju area

    Energy Technology Data Exchange (ETDEWEB)

    U, Zang Kual; Kang, Tae Woo; Park, Won Pyo [Jeju National Univ., Jeju (Korea, Republic of)

    2002-12-15

    The project is carried out to monitor the change of environmental radioactivity in Jeju, and to provide a systematic data for radiation monitoring and counter measurement at a radiological emergency situation. Also the survey of natural environmental radioactivities in the samples was conducted to make the reliable data base for evaluation of internal exposure and environmental contamination of radiation. This report contains the data of gamma exposure rates and radioactivities of airborne dust, fallout, precipitation and tap water which were analyzed periodically by Jeju Regional Monitoring Station in 2001. Also it contains the data of natural radioactivity levels of food stuff such as agricultural and marine products, including drinking waters.

  1. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Westinghouse Electric Company Waste Isolation Division

    1999-01-01

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement

  2. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  3. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  4. Survey monitoring of environmental radioactivity in Jeju area

    Energy Technology Data Exchange (ETDEWEB)

    U, Zang Kual; Kang, Tae Woo [Jeju National Univ., Jeju (Korea, Republic of)

    2000-12-15

    The project is carried out to monitor the change of environmental radioactivity in Jeju, and to provide a systematic data for radiation monitoring and counter measurement at a radiological emergency situation. Also the survey of natural environmental radioactivities in the samples was conducted to make the reliable data base for evaluation of internal exposure and environmental contamination of radiation. This report contains the data of gamma exposure rates and radioactivities of airborne dust, fallout, precipitation and tap water which were analyzed periodically by Jeju Regional Monitoring Station in 2000. Also it contains the data of natural radioactivity levels of food stuff such as agricultural and marine products, including drinking waters. There was no significant difference in environmental radioactivities between 1999 and 2000.

  5. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  6. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  7. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  8. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  9. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  10. Wireless data management system for environmental monitoring in livestock buildings

    Directory of Open Access Journals (Sweden)

    James Gray

    2017-03-01

    Full Text Available The impact of air quality on the health, welfare and productivity of livestock needs to be considered, especially when livestock are kept in enclosed buildings. The monitoring of such environmental factors allows for the development of appropriate strategies to reduce detrimental effects of sub-optimal air quality on the respiratory health of both livestock and farmers. In 2009, an environmental monitoring system was designed, developed and tested that allowed for the monitoring of a number of airborne pollutants. One limitation of the system was the manual collection of logged data from each unit. This paper identifies limitations of the current environmental monitoring system and suggests a range of networking technologies that can be used to increase usability. Consideration is taken for the networking of environmental monitoring units, as well as the collection of recorded data. Furthermore, the design and development of a software system that is used to collate and store recorded environmental data from multiple farms is explored. In order to design such a system, simplified software engineering processes and methodologies have been utilised. The main steps taken in order to complete the project were requirements elicitation with clients, requirements analysis, system design, implementation and finally testing. The outcome of the project provided a potential prototype for improving the environmental monitoring system and analysis informing the benefit of the implementation.

  11. Water Quality Monitoring of an Urban Estuary and a Coastal Aquifer Using Field Kits and Meters: A Community-Based Environmental Research Project

    Science.gov (United States)

    Jung, Hun Bok; Zamora, Felix; Duzgoren-Aydin, Nurdan S.

    2017-01-01

    Water quality is an important interdisciplinary environmental topic for project-based learning. An undergraduate summer research internship program at a public minority serving institution engaged environmental science majors in community-based research experiences. The research focused on the field monitoring of water quality for surface water…

  12. Environmental monitoring plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. Atmosphere Resource Recovery and Environmental Monitoring

    Science.gov (United States)

    Roman, Monsi; Howard, David

    2015-01-01

    Atmosphere Resource Recovery and Environmental Monitoring (ARREM) is a project focused on evolving existing and maturing emerging 'closed loop' atmosphere revitalization (AR) life support systems that produce clean, breathable air for crewmembers, and developing a suite of low mass, low power environmental monitors to detect and measure air- and waterborne constituents and contaminants. The objective is to improve reliability and efficiency, reduce mass and volume, and increase recovery of oxygen from carbon dioxide created by human metabolism from 43% to greater than 90%. The technology developments under ARREM are vital to extending human space missions from low-Earth orbit like the International Space Station to destinations deeper into space such as Mars where dependency on Earth for resupply of maintenance items and critical life support elements such as water and oxygen is not possible. The primary goal of the ARREM project is to demonstrate that systems meet the more stringent performance parameters for deep space exploration and are compatible with other systems within closed loop life support through a series of integrated tests performed in an environmental test chamber capable of simulating human metabolic activities and measuring systems outputs.

  18. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  19. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  20. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  1. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  2. PERMEABLE TREATMENT WALL EFFECTIVENESS MONITORING PROJECT, NEVADA STEWART MINE

    Science.gov (United States)

    This report summarizes the results of Mine Waste Technology Program (MWTP) Activity III, Project 39, Permeable Treatment Wall Effectiveness Monitoring Project, implemented and funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. De...

  3. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  7. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  8. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.

    1999-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  9. Overview of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Ikenberry, T.A.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that specific and representative individuals and populations may have received as a result of releases of radioactive materials from historical operations at the Hanford Site. These dose estimates would account for the uncertainties of information regarding facilities operations, environmental monitoring, demography, food consumption and lifestyles, and the variability of natural phenomena. Other objectives of the HEDR Project include: supporting the Hanford Thyroid Disease Study (HTDS), declassifying Hanford-generated information and making it available to the public, performing high-quality, credible science, and conducting the project in an open, public forum. The project is briefly described

  10. Integrated environmental monitoring program at the Hanford Site

    International Nuclear Information System (INIS)

    Jaquish, R.E.

    1990-08-01

    The US Department of Energy's Hanford Site, north of Richland, Washington, has a mission of defense production, waste management, environmental restoration, advanced reactor design, and research development. Environmental programs at Hanford are conducted by Pacific Northwest Laboratory (PNL) and the Westinghouse Hanford Company (WHC). The WHC environmental programs include the compliance and surveillance activities associated with site operations and waste management. The PNL environmental programs address the site-wide and the of-site areas. They include the environmental surveillance and the associated support activities, such as dose calculations, and also the monitoring of environmental conditions to comply with federal and state environmental regulations on wildlife and cultural resources. These are called ''independent environmental programs'' in that they are conducted completely separate from site operations. The Environmental Surveillance and Oversight Program consists of the following projects: surface environmental surveillance; ground-water surveillance; wildlife resources monitoring; cultural resources; dose overview; radiation standards and calibrations; meteorological and climatological services; emergency preparedness

  11. Hanford environmental dose reconstruction project - an overview

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Farris, W.T.

    1996-01-01

    The Hanford Environmental Dose Reconstruction Project was initiated because of public interest in the historical releases of radioactive materials from the Hanford Site, located in southcentral Washington State. By 1986, over 38,000 pages of environmental monitoring documentation from the early years of Hanford operations had been released. Special committees reviewing the documents recommended initiation of the Hanford Environmental Dose Reconstruction Project, which began in October 1987, and is conducted by Battelle, Pacific Northwest Laboratories. The technical approach taken was to reconstruct releases of radioactive materials based on facility operating information; develop and/or adapt transport, pathway, and dose models and computer codes; reconstruct environmental, meterological, and hydrological monitoring information; reconstruct demographic, agricultural, and lifestyle characteristics; apply statistical methods to all forms of uncertainty in the information, parameters, and models; and perform scientific investigation that were technically defensible. The geographic area for the study includes ∼2 x 10 5 km 2 (75,000 mi 2 ) in eastern Washington, western Idaho, and northeastern Oregon (essentially the Mid-columbia Basin of the Pacific Northwest). Three exposure pathways were considered: the atmosphere, the Columbia River, and ground water

  12. Environmental monitoring master sampling schedule: January--December 1989

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1989-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1989 for the Surface and Ground-Water Environmental Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. This schedule includes routine ground-water sampling performed by PNL for Westinghouse Hanford Company, but does not include samples that may be collected in 1989 to support special studies or special contractor projects, or for quality control. The sampling schedule for Site-wide chemical monitoring is not included here, because it varies each quarter as needed, based on past results and operating needs. This schedule does not include Resource Conservation and Recovery Act ground-water sampling performed by PNL for Hanford Site contractors, nor does it include sampling that may be done by other DOE Hanford contractors

  13. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  14. Environmental monitoring plan - environmental monitoring section. Revision 1

    International Nuclear Information System (INIS)

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures

  15. DIADEM: a system for collaborative environmental monitoring

    NARCIS (Netherlands)

    Winterboer, A.; Martens, M.A.; Pavlin, G.; Groen, F.C.A.; Evers, V.

    2011-01-01

    Environmental monitoring and emergency response projects in urban-industrial areas increasingly rely on efficient collaboration between experts in control rooms and at incident locations, and citizens who live or work in the area. In the video accompanying this abstract we present a system that uses

  16. West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, Alison F. [CH2M Hill BWXT West Valley, LLC, NY (United States); Pendl, Michael P. [CH2M Hill BWXT West Valley, LLC, NY (United States); Steiner, II, Robert E. [CH2M Hill BWXT West Valley, LLC, NY (United States); Fox, James R. [CH2M Hill BWXT West Valley, LLC, NY (United States); Hoch, Jerald J. [CH2M Hill BWXT West Valley, LLC, NY (United States); Williams, Janice D. [CH2M Hill BWXT West Valley, LLC, NY (United States); Wrotniak, Chester M. [CH2M Hill BWXT West Valley, LLC, NY (United States); Werchowski, Rebecca L. [CH2M Hill BWXT West Valley, LLC, NY (United States)

    2017-09-12

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. MONDO Project: real time ocean monitoring through Lagrangian drifters during offshore drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Mafra, Tatiana [Eni Oil do Brasil, Rio de Janeiro, RJ (Brazil); Fragoso, Mauricio da Rocha; Santos, Francisco Alves dos; Cruz, Leonardo M. Marques A.; Pellegrini, Julio A.C.; Cerrone, Bruna Nogueira [Prooceano, Rio de Janeiro, RJ (Brazil); Assireu, Arcilan Trevenzoli [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil)

    2008-07-01

    Monitoring the ocean conditions during offshore operations is essential for both operational and environmental aspects. Environmentally, not only to know better the environment where the activity is taking place, but also to be able to provide fast and accurate response in case of accidents. MONDO Project (Monitoring by Ocean Drifters) is a pioneer initiative from ENI Oil do Brasil and PROOCEANO that aimed to monitor currents as a part of a metoceanographic data monitoring project of drilling operations in Brazilian Waters, in Santos Basin throughout September to November 2007, 40 satellite tracked ocean drifters were deployed will be transmitting data up to November 2008. The results of this project can be used to study a wide range of subjects about ocean dynamics. Following the principles of social and environmental responsibility, MONDO Project aims to benefit the local ecosystem in increasing the scientific knowledge of the area to calibrate hydrodynamic models that will lead to more accurate modeling results and, as a consequence, to a better management of contingency plans. Based on these principles, the project will also provide unrestricted access to oceanographic data even after the end of operations. (author)

  18. Environmental monitoring in the Middle East. Special evaluation review

    International Nuclear Information System (INIS)

    1995-01-01

    After the Chernobyl accident some Middles East countries approached the IAEA with their concerns about contamination. Therefore, a regional project (RER/9/003, Environmental Monitoring in the Middle East) was established in 1987. The present document is a progress report of this project. It discusses project design, project management, its implementation and achievements. Certain conclusions and recommendations are given based on the evaluation of the findings

  19. Environmental monitoring in the Middle East. Special evaluation review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-19

    After the Chernobyl accident some Middles East countries approached the IAEA with their concerns about contamination. Therefore, a regional project (RER/9/003, Environmental Monitoring in the Middle East) was established in 1987. The present document is a progress report of this project. It discusses project design, project management, its implementation and achievements. Certain conclusions and recommendations are given based on the evaluation of the findings.

  20. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  1. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Hartman, Mary J.; Dresel, P. Evan; Lindberg, Jon W.; Newcomer, Darrell R.; Thornton, Edward C.

    2000-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  2. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  3. Tracking environmental monitoring data using EDRIS

    International Nuclear Information System (INIS)

    Engelder, P.R.

    1992-01-01

    For 10 years, operating contractors at the US Department of Energy Grand Junction Projects Office (GJPO) manually compiled and tracked environmental monitoring data collected at the GJPO and for the Monticello Remedial Action Project in Monticello, Utah. The Environmental Data Retrieval and Information System (EDRIS), which uses an ORACLE database, helps maintain compliance and facilitates the tracking and comparison of these data with the applicable or relevant and appropriate requirements (ARARs) such as CERCLA, RCRA and the state regulations. The design of EDRIS allows unrestricted input and verification of all aspects of a complete environmental monitoring database package. This database catalogs the following components: groundwater chemistry, surface water chemistry, air particulate chemistry, soil chemistry, sewer effluent chemistry, storm run-off chemistry, the quantity of suspended air particulates less than 10 μ in size, meteorological data, radon data, environmental radiation data, water levels, information on well installations and completions, status of all applicable permits and ARARs. Macros enable the transfer of information to EDRIS in an electronic format to maintain the integrity of the data. In addition to data entry and verification, EDRIS capabilities allow unrestricted retrieval of data through menus designed to permit various types of comparisons, including an examination of historical and current data against the most restrictive current standard. One example of the flexibility of EDRIS is the ability to compare the data with selected standards. This comparison is accomplished by performing applicable calculations to the data as they are retrieved from the database

  4. User's guide to a data base of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, M.Y.; Defferding, J.; Chapman, E.G.; Bettinson, M.D.; Glantz, C.S.

    1987-11-01

    This document describes how to use a data base of current transboundary region environmental monitoring projects. The data base was prepared from data provided by Glantz et al. (1986) and Concord Scientific Corporation (1985), and contains information on 226 projects with monitoring stations located within 400 km (250 mi) of the US-Canadian border. The data base is designed for use with the dBASE III PLUS data management systems on IBM-compatible personal computers. Data-base searches are best accomplished using an accompanying command file called RETRIEVE or the dBASE command LIST. The user must carefully select the substrings on which the search is to be based. Example search requests and subsequent output are presented to illustrate substring selections and applications of the data base. 4 refs., 15 figs., 4 tabs.

  5. Finnish remote environmental monitoring field demonstration

    International Nuclear Information System (INIS)

    Toivonen, H.; Leppaenen, A.; Ylaetalo, S.; Lehtinen, J.; Hokkinen, J.; Tarvainen, M.; Crawford, T.; Glidewell, D.; Smartt, H.; Torres, J.

    1997-10-01

    Radiation and Nuclear Safety Authority (STUK), Helsinki, Finland and Sandia National Laboratories (SNL), working under the Finnish Support Program to IAEA Safeguards and the United States Department of Energy (DOE) funded International Remote Monitoring Program (Task FIN E 935), have undertaken a joint effort to demonstrate the use of remote monitoring for environmental air sampling and safeguards applications. The results of the task will be used by the IAEA to identify the feasibility, cost-effectiveness, reliability, advantages, and problems associated with remote environmental monitoring. An essential prerequisite for a reliable remote air sampling system is the protection of samples against tampering. Means must be developed to guarantee that the sampling itself has been performed as designed and the original samples are not substituted with samples produced with other equipment at another site. One such method is to label the samples with an unequivocal tag. In addition, the inspection personnel must have the capability to remotely monitor and access the automated environmental air sampling system through the use of various sensors and video imagery equipment. A unique aspect to this project is the network integration of remote monitoring equipment with a STUK radiation monitoring system. This integration will allow inspectors to remotely view air sampler radiation data and sensor/image data through separate software applications on the same review station. A sensor network and video system will be integrated with the SNL developed Modular Integrated Monitoring System (MIMS) to provide a comprehensive remote monitoring approach for safeguards purposes. This field trial system is being implemented through a multiphase approach for use by STUK, SNL, and for possible future use by the IAEA

  6. Environmental monitoring of nuclear facilities

    International Nuclear Information System (INIS)

    Koelzer, W.

    1988-01-01

    Environmental monitoring of nuclear facilities is part of general monitoring for environmental radioactivity all over the territory of the Federal Republic of Germany. General principles of environmental monitoring were formulated by the ICRP in 1965. In 1974 guidelines for measures of monitoring the environment of NPP incorporating LWR were drafted, which helped to standardize environmental monitoring programs. Since 1958, data on environmental radioactivity from measurements by authorized laboratories have been published in reports. (DG)

  7. Environmental monitoring handbook for coal conversion facilities

    Energy Technology Data Exchange (ETDEWEB)

    Salk, M.S.; DeCicco, S.G. (eds.)

    1978-05-01

    The primary objectives of the Department of Energy's (DOE) coal conversion program are to demonstrate the environmental acceptability, technical feasibility, and economic viability of various technologies for gaseous, liquid, and solid fuels from coal. The Environmental Monitoring Handbook for Coal Conversion Facilities will help accomplish the objective of environmental acceptability by guiding the planning and execution of socioeconomic and environmental monitoring programs for demonstration facilities. These programs will provide information adequate to (1) predict, insofar as is possible, the potential impacts of construction and operation of a coal conversion plant, (2) verify the occurrence of these or any other impacts during construction and operation, (3) determine the adequacy of mitigating measures to protect the environment, (4) develop effluent source terms for process discharges, and (5) determine the effectiveness of pollution control equipment. Although useful in a variety of areas, the handbook is intended primarily for contractors who, as industrial partners with DOE, are building coal conversion plants. For the contractor it is a practical guide on (1) the methodology for developing site- and process-specific environmental monitoring programs, (2) state-of-the-art sampling and analytical techniques, and (3) impact analyses.To correspond to the phases of project activity, the subject matter is divided into four stages of monitoring: (1) a reconnaissance or synoptic survey, (2) preconstruction or baseline, (3) construction, and (4) operation, including process monitoring (prepared by Radian Corp., McLean, Va.). For each stage of monitoring, guidelines are given on socioeconomics, aquatic and terrestrial ecology, air quality and meteorology, surface and groundwater quality, geohydrology and soil survey, and surface water hydrology.

  8. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    International Nuclear Information System (INIS)

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-01-01

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  9. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  10. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  11. Environmental radiation monitoring

    International Nuclear Information System (INIS)

    Watanabe, Isao

    2011-01-01

    The samples, pretreatment method, and measurement methods of 'Environmental radioactivity level by prefecture' of Ministry of Education, Culture, Sports, Science and Education (MEXT) is explained. It consists of 1), 'Environmental radioactivity level by prefecture' in normal period, 2) 'Strengthening of Monitoring of Environmental Radioactivity Level by Prefecture' of MEXT at emergency 3) strengthening of monitoring by Fukushima Daiichi nuclear accident, 4) radiation monitoring around the nuclear facility, 5) strengthening of monitoring by MEXT, and 6) quality of monitoring. The survey item and samples etc., of 'Environmental radioactivity level by prefecture', monitoring post, NaI (Tl) scintillation survey meter, sampling and pretreatment methods for radionuclide analysis in normal period, an example of germanium semiconductor detector, gamma ray spectrum of spaghetti from Italy by germanium semiconductor detector, flow chart of radionuclide analysis of fallout in normal period and emergency by germanium semiconductor detector, example of analytical method of radioactive strontium ( ion exchange method), outline of plutonium analytical method for emergency, sampling and pretreatment methods of radionuclides for strengthening, monitoring result around Fukushima Daiichi nuclear plant from June 23 to 24, 2011, change of air dose rate of monitoring post in Mito city from March 14 to 26, 2011, concentration of I-131 and Cs-137 in fallout in Hitachinaka city from March 19 to April 30, 2011, and change of concentration of I-131, Cs-134 and Cs-137 in tap water of Iitate village from March 20 to April 30, 2011, are illustrated. (S.Y.)

  12. Radioactive environmental impact assessment for a highway construction project in Guangdong province

    International Nuclear Information System (INIS)

    Qiu Guohua

    2009-01-01

    Based on the field environmental investigation and monitoring result, the radioactive environmental impact for a highway construction project in Guangdong province has been analyzed and assessed and forecacted. (authors)

  13. Operational environmental monitoring plan for the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Mercer, D.D.; Baker, P.L.; Cockman, J.S.; Fischer, N.T.; Flynn, D.T.; Harvill, J.P.; Knudtsen, K.L.; Louderbough, E.T.

    1989-01-01

    This plan defines the scope and extent of the WIPP effluent and environmental monitoring programs during the facility's operational life. It also discusses the quality assurance/quality control programs which ensure that samples collected and the resulting analytical data are representative of actual conditions at the WIPP site. This plan provides a comprehensive description of environmental activities at WIPP, including: a summary of environmental program information, including an update of the status of environmental permits and compliance activities; a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of applicable standards and regulatory requirements and brief discussions of potential exposure pathways, routine and accidental releases, and their consequences; a summary of the preoperational environmental monitoring and assessment activities and responses to the requirements (Appendix A) and guidelines presented in the ''Radiological Effluent Monitoring and Environmental Surveillance for US DOE Operations.'' 166 refs., 28 figs., 27 tabs

  14. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  15. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  16. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  17. Monitoring Space Radiation Hazards with the Responsive Environmental Assessment Commercially Hosted (REACH) Project

    Science.gov (United States)

    Mazur, J. E.; Guild, T. B.; Crain, W.; Crain, S.; Holker, D.; Quintana, S.; O'Brien, T. P., III; Kelly, M. A.; Barnes, R. J.; Sotirelis, T.

    2017-12-01

    The Responsive Environmental Assessment Commercial Hosting (REACH) project uses radiation dosimeters on a commercial satellite constellation in low Earth orbit to provide unprecedented spatial and time sampling of space weather radiation hazards. The spatial and time scales of natural space radiation environments coupled with constraints for the hosting accommodation drove the instrumentation requirements and the plan for the final orbital constellation. The project has delivered a total of thirty two radiation dosimeter instruments for launch with each instrument containing two dosimeters with different passive shielding and electronic thresholds to address proton-induced single-event effects, vehicle charging, and total ionizing dose. There are two REACH instruments currently operating with four more planned for launch by the time of the 2017 meeting. Our aim is to field a long-lived system of highly-capable radiation detectors to monitor the hazards of single-event effects, total ionizing dose, and spacecraft charging with maximized spatial coverage and with minimal time latency. We combined a robust detection technology with a commercial satellite hosting to produce a new demonstration for satellite situational awareness and for other engineering and science applications.

  18. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  19. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  20. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  1. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  2. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  3. Environmental monitoring of a wind park during the construction phase

    International Nuclear Information System (INIS)

    Castonguay, M.; Caron, F.

    2007-01-01

    Wind energy qualifies as green energy because of low gas emissions associated with energy production. However, in order to truly qualify as green, each phase of a wind energy project should be evaluated, including construction, the energy exploitation period, as well as the dismantling of the turbines. Environmental monitoring of wind turbine arrays during the construction and dismantling phases could reveal the environmental impact of a project. This article provided the example of a wind turbine array at l'Anse-a-Valleau, located in a forested territory on the north side of the Gaspe Peninsula along the St. Lawrence River in Quebec. The park was configured to have 67 wind turbines of 1.5 MW each, for a total of 100.5 MW. The project was evaluated at $164 million, with regional economic spending of $65.8 million. During the height of construction, the project employed 240 workers. Ten full-time jobs will be created for the operation phase, scheduled for the end of 2007. The environmental monitoring at the construction site is deemed both technical and social. Good working conditions and communication must be established between the environmental supervisor and the site manager. They must work jointly to ensure good conduct and progress of the work at the construction site. The environmental supervisor must have the necessary authority to stop work upon a breach of regulations in the deforesting phase, since 60 per cent of the territory is on public domain. Environmental monitoring also includes surveillance of the road construction, soil quality, transportation of equipment, air quality, noise pollution, and residual matter management. It was concluded that wind energy is a true form of green energy, and methods used by developers during construction demonstrate responsibility towards the environment. It was suggested that the key to success is to have good pre-planning and good communication between all parties concerned. 4 figs

  4. Environmental radiation monitoring system

    International Nuclear Information System (INIS)

    Kato, Tsutomu; Shioiri, Masatoshi; Sakamaki, Tsuyoshi

    2007-01-01

    Environmental radiation monitoring systems are used to measure and monitoring gamma-rays at the observation boundaries of nuclear facilities and in the surrounding areas. In recent years, however, few new nuclear facilities have been constructed and the monitoring systems shift to renewal of existing systems. In addition, in order to increase public acceptance, the facilities are being equipped with communication lines to provide data to prefectural environmental centers. In this text, we introduce the latest technology incorporated in replacement of environmental radiation monitoring systems. We also introduce a replacement method that can shorten the duration during which environmental dose rate measurement is interrupted by enabling both the replacement system and the system being replaced to perform measurements in parallel immediately before and after the replacement. (author)

  5. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  6. Metagenomic applications in environmental monitoring and bioremediation.

    Science.gov (United States)

    Techtmann, Stephen M; Hazen, Terry C

    2016-10-01

    With the rapid advances in sequencing technology, the cost of sequencing has dramatically dropped and the scale of sequencing projects has increased accordingly. This has provided the opportunity for the routine use of sequencing techniques in the monitoring of environmental microbes. While metagenomic applications have been routinely applied to better understand the ecology and diversity of microbes, their use in environmental monitoring and bioremediation is increasingly common. In this review we seek to provide an overview of some of the metagenomic techniques used in environmental systems biology, addressing their application and limitation. We will also provide several recent examples of the application of metagenomics to bioremediation. We discuss examples where microbial communities have been used to predict the presence and extent of contamination, examples of how metagenomics can be used to characterize the process of natural attenuation by unculturable microbes, as well as examples detailing the use of metagenomics to understand the impact of biostimulation on microbial communities.

  7. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Hunter, S.W.; Gallegos, G.M.; Surano, K.A.; Lamson, K.C.; Tate, P.J.; Balke, B.K.; Biermann, A.H.; Hoppes, W.G.; Fields, B.C.; Gouveia, F.J.; Berger, R.L.; Miller, F.S.; Rueppel, D.W.; Sims, J.M.

    1992-04-01

    The primary tasks of the environmental monitoring section (EMS) Livermore National Laboratory (LLNL) are: effluent monitoring of air, sewer, and NPDES water. Surveillance monitoring of soil, vegetation and foodstuff, water, air particulate, and air tritium. Radiation monitoring, dose assessment, emergency response, quality assurance, and reporting. This report describes LLNL and the monitoring plan

  8. Environmental γ radiation monitor

    International Nuclear Information System (INIS)

    Qu Xiaopeng

    1993-01-01

    The environmental γ radiation monitor is a kind of dose or dose rate measuring devices, which can be used for monitoring environmental γ radiation around a nuclear site when normal or even abnormal events occur. The monitor is controlled by a single-chip microcomputer so that it can acquire synchronously the data from four detectors and transfer the data to a central computer. The monitor has good temperature property due to the technique of temperature correction. The monitor has been used in the environment monitoring vehicle for Qinshan Nuclear Power Plant

  9. Radiation safety assessment and development of environmental radiation monitoring technology

    CERN Document Server

    Choi, B H; Kim, S G

    2002-01-01

    The Periodic Safety Review(PSR) of the existing nuclear power plants is required every ten years according to the recently revised atomic energy acts. The PSR of Kori unit 1 and Wolsong unit 1 that have been operating more than ten years is ongoing to comply the regulations. This research project started to develop the techniques necessary for the PSR. The project developed the following four techniques at the first stage for the environmental assessment of the existing plants. 1) Establishment of the assessment technology for contamination and accumulation trends of radionuclides, 2) alarm point setting of environmental radiation monitoring system, 3) Development of Radiation Safety Evaluation Factor for Korean NPP, and 4) the evaluation of radiation monitoring system performance and set-up of alarm/warn set point. A dynamic compartment model to derive a relationship between the release rates of gas phase radionuclides and the concentrations in the environmental samples. The model was validated by comparing ...

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  12. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  13. Idaho National Laboratory Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  14. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  15. Interim report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  16. Survey monitoring of environmental radioactivity in Daegu area

    Energy Technology Data Exchange (ETDEWEB)

    Kang, H. D.; Lee, S. Y. [Kyungpook National Univ., Daegu (Korea, Republic of)

    1998-01-15

    The objectives of the project are to monitor an abnormal radiation level in Taegu and Kyungpook region, and to enhance our ability to prepare for the radiological emergency situation by establishing the radioactivity monitoring system in Taegu and Kyungpook region. Gross beta activities were measured and gamma radionuclides were analysed for the environmental samples of air-borned dust. precipitation. fallout and drinking water collected in Taegu radioactivity monitoring center. and gamma exposure rates were also measured. To establish the basic data base on the environmental radioactivity, gamma radionuclide analyses were carried out for the samples of soil, drinking water, grain, vegetable, milk, and fish which were obtained from 31 different areas, and the spatial gamma exposure rates from 61 different points were also measured in Taegu and Kyungpook region. In conclusion, it didn't appear any evidence for newly pollution of artificial radioactivity in Taegu and Kyungpook region.

  17. Near-facility environmental monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, J.W.; Johnson, A.R.; Markes, B.M.; McKinney, S.M.; Perkins, C.J.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the routine near-facility environmental monitoring programs which are presently being conducted at the Hanford Site. Several types of environmental media are sampled near nuclear facilities to monitor the effectiveness of waste management and restoration activities, and effluent treatment and control practices. These media include air, surface water and springs, surface contamination, soil and vegetation, investigative sampling (which can include wildlife), and external radiation. Sampling and analysis information and analytical results for 1994 for each of these media are summarized in this section. Additional data and more detailed information may be found in Westinghouse Hanford Company Operational Environmental Monitoring Annual Report, Calendar Year 1994.

  18. Statistical analysis of real-time, enviromental radon monitoring results at the Fernald Enviromental Management Project

    International Nuclear Information System (INIS)

    Liu, Ning; Spitz, H.B.; Tomezak, L.

    1996-01-01

    A comprehensive real-time, environmental radon monitoring program is being conducted at the Fernald Environmental Management Project, where a large quantity of radium-bearing residues have been stored in two covered earth-bermed silos. Statistical analyses was conducted to determine what impact radon emitted by the radium bearing materials contained in the silos has on the ambient radon concentration at the Fernald Environmental Management Project site. The distribution that best describes the outdoor radon monitoring data was determined before statistical analyses were conducted. Random effects associated with the selection of radon monitoring locations were accommodated by using nested and nested factorial classification models. The Project site was divided into four general areas according to their characteristics and functions: (1) the silo area, where the radium-bearing waste is stored; (2) the production/administration area; (3) the perimeter area, or fence-line, of the Fernald Environmental Management Project site; and (4) a background area, located approximately 13 km from the Fernald Environmental Management Project site, representing the naturally-occurring radon concentration. A total of 15 continuous, hourly readout radon monitors were installed to measure the outdoor radon concentration. Measurement results from each individual monitor were found to be log-normally distributed. A series of contrast tests, which take random effects into account, were performed to compare the radon concentration between different areas of the site. These comparisons demonstrate that the radon concentrations in the production/administration area and the perimeter area are statistically equal to the natural background, whereas the silo area is significantly higher than background. The study also showed that the radon concentration in the silo area was significantly reduced after a sealant barrier was applied to the contents of the silos. 10 refs., 6 figs., 8 tabs

  19. Terra Nova Environmental effects monitoring program

    International Nuclear Information System (INIS)

    Williams, U.; Murdoch, M.

    2000-01-01

    Elements of the environmental effects monitoring program in the Terra Nova oil field, about 350 km east-southeast of St. John's, Newfoundland, are described. This oilfield is being developed using a floating production storage and offloading (FPSO) facility. A total of 24 wells are expected to be drilled through seven subsea templates located in four glory holes to protect them from icebergs. Subsea installations will be linked to the FPSO by trenched flowlines connected to flexible risers. The FPSO will offload to shuttle tankers. First oil is expected in 2001. The environmental effects monitoring program will be conducted annually for the first two years beginning in 2000. Subsequent scheduling will be determined after a review of monitoring data collected during the first three years. Input to the design of the monitoring program was provided by all stakeholders, i. e. owners, local public, government agencies and regional and international experts. A model was developed linking project discharges and possible effects to the environment, including marine resources in the area, and the information derived from these activities was used to generate a set of predictions and hypotheses to be tested in the monitoring program. The monitoring program will use two spatial models: a regression or gradient design and a control-impact design. The gradient design will monitor water column and sediment chemistry, sediment toxicity and benthic invertebrate communities. The control-impact design will be used to monitor larger and more mobile fish or shellfish. The evaluated results will serve as the basis for determining impact predictions and to provide information to allow for decisions pertaining to the protection of the marine environment

  20. Radioactive environmental impact assessment for a production project of titanium dioxide by chlorination process

    International Nuclear Information System (INIS)

    Qiu Guohua

    2010-01-01

    Based on the analysis of shifting direction of radionuclide in production process and the environmental investigation and monitoring, the radioactive environmental impact from a production project of titanium dioxide by chlorination process has been analyzed and assessed. The result of radioactive environmental investigation shows that values of assessment factors are in the range of environmental radioactive background. The radioactive environmental sensitive spot has been delineated. The results of radioactive environmental prediction show that the additional doses to workers and residents are 0.59 mSv/a and 9.28 × 10-4 mSv/a respectively which are less than the annual dose limits of administration. The radioactive environmental impact of the production project of the titanium dioxide by chlorination process will meet the needs of national regulations and standards if radiation protection and environmental protection measures are implemented and radioactive environmental monitoring are strengthened. (author)

  1. Review of ExxonMobil Canada's 2008 offshore environmental effects monitoring report

    Energy Technology Data Exchange (ETDEWEB)

    Cogswell, A.; Kenchington, E.; Kennedy, E.; Law, B.; Lee, K.; Tremblay, J.; Worcester, T. [Department of Fisheries and Oceans Canada, Dartmouth, NS (Canada). Maritimes Science; Courtenay, S. [Department of Fisheries and Oceans Canada, Moncton, NB (Canada). Gulf Science; Payne, J. [Department of Fisheries and Oceans Canada, St. John' s, NL (Canada). Newfoundland and Labrador Science

    2009-07-15

    The environmental effects monitoring (EEM) program for the Sable Offshore Energy Project (SOEP) was designed to evaluate predictions made during its environmental assessment (EA) process. The Oceans, Habitat, and Species at Risk Branch of the Department of Fisheries and Oceans Canada was asked to review ExxonMobil Canada Properties Inc.'s 2008 annual report regarding the EEM for this offshore project. This report reviewed the monitoring results for benthic habitat and fish density; produced water chemistry and toxicity; and mussel hydrocarbon body burden. This report revealed that SOEP's 2008 EEM was consistent with previous reports, but that the monitoring methods used were not particularly meaningful, particularly since they failed to address fish health and fish quality issues. 3 refs.

  2. Environmental Monitoring Plan - February 2016

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, T M; Williams, R A; Wilson, K R

    2016-02-08

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection oft/ic Pubile and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the hiota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements.

  3. Environmental monitoring for krypton-85

    International Nuclear Information System (INIS)

    Barber, D.E.

    1973-01-01

    85 Kr presents unique environmental monitoring problems because it does not react with other elements and compounds at normal ambient temperatures and pressures. However, elaborate means are available to manage the 85 Kr problem, but a simpler, inexpensive approach is required if monitoring is to be accomplished at many sampling locations. This work shows that environmental monitoring for 85 Kr is possible by collecting air samples in thin plastic bags, and counting the bags for beta particle activity. The direct counting of contained samples of this type makes it possible to detect concentrations less than the public MPC for 85 Kr. The bagged-sample technique is readily adaptable to any environmental monitoring station with power to run a low-volume air pump. The idea of counting the bagged-sample directly is a new, low-cost, approach to environmental gas monitoring which may have application in environmental, clinical, and industrial situations

  4. Environmental radiation monitoring technology: Capabilities and needs

    International Nuclear Information System (INIS)

    Hofstetter, K.J.

    1994-01-01

    Radiation monitoring in the Savannah River Site (SRS) environment is conducted by a combination of automated, remote sampling and/or analysis systems, and manual sampling operations. This program provides early detection of radionuclide releases, minimizes the consequences, and assesses the impact on the public. Instrumentation installed at the release points monitor the atmospheric and aqueous releases from SRS operations. Ground water and air monitoring stations are strategically located throughout the site for radionuclide migration studies. The environmental radiological monitoring program at SRS includes: fixed monitoring stations for atmospheric radionuclide concentrations, aqueous monitors for surface water measurements, mobile laboratory operations for real-time, in-field measurements, aerial scanning for wide area contamination surveillance, and hand-held instruments for radionuclide-specific measurements. Rigorous environmentnal sampling surveillance coupled with laboratory analyses provide confirmatory results for all in-field measurements. Gaps in the technologies and development projects at SRS to fill these deficiencies are discussed in the context of customer needs and regulatory requirements

  5. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  6. Environmental monitoring annual report for the Tumulus Disposal Demonstration Project

    International Nuclear Information System (INIS)

    Yager, R.E.; Craig, P.M.

    1989-01-01

    The Fiscal Year 1988 Annual Report is the third in a series of semi-annual Tumulus Development Disposal Project data summary reports. The reporting schedule has been modified to correspond to the fiscal years and the subcontractor contract periods. This data summary spans the time from start of operations in June 1987 through the end of September 1988. The environmental data collected include run-off water quality and quantity, groundwater quality and levels, soil sampling and hydrometeorological data. This data is being used and analyzed here to demonstrate the environmental performance objectives for the TDDP as part of the overall performance assessment for the TDDP. Approximately one year of pre-operational data were collected prior to operations beginning on April 11, 1988. Comparisons are made between pre- and post-operational data. No significant environmental impacts have been found since operations have begun. 10 refs., 21 figs., 22 tabs

  7. URBAN SPRAWL MODELING, AIR QUALITY MONITORING AND RISK COMMUNICATION: THE NORTHEAST OHIO PROJECT

    Science.gov (United States)

    The Northeast Ohio Urban Sprawl, Air Quality Monitoring, and Communications Project (hereafter called the Northeast Ohio Project) provides local environmental and health information useful to residents, local officials, community planners, and others in a 15 county region in the ...

  8. Annual environmental monitoring report, January-December 1986

    International Nuclear Information System (INIS)

    1987-03-01

    Environmental monitoring and remedial actions at the Stanford Linear Accelerator Center are reported. The local climate, site geology, site water usage, land use, and demography are briefly reviewed. Among the activities reported are waste solvent tank remedial action and testing of underground storage tanks. The SLAC Linear Collider Project is discussed insofar as it impacts the environment. Neutron radiation dose to the surrounding environment and radioactive effluents are reported

  9. Mound Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bauer, L.R.; Tullis, M.S.; Paulick, R.P.; Roush, L.L.

    1994-07-01

    The purpose of this Environmental Monitoring Plan (EMP) is to describe the environmental monitoring and surveillance programs in place at Mound. The Plan is required by DOE Order 5400.1 (DOE, 1990). The programs described in the EMP are required by the DOE 5400 Order series and by the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environment Surveillance (DOE 1991a), referred to as the Regulatory Guide throughout this Plan

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  12. Active Sites Environmental Monitoring Program. FY 1993: Annual report

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Ashwood, T.L.; Hicks, D.S.; Marsh, J.D.

    1994-08-01

    This report continues a series of annual and semiannual reports that present the results of the Active Sites Environmental Monitoring Program (ASEMP) monitoring activities. The report details monitoring data for fiscal year (FY) 1993 and is divided into three major areas: SWSA 6 [including tumulus pads, Interim Waste Management Facility (IWMF), and other sites], the low-level Liquid-Waste Solidification Project (LWSP), and TRU-waste storage facilities in SWSA 5 N. The detailed monitoring methodology is described in the second revision of the ASEMP program plan. This report also presents a summary of the methodology used to gather data for each major area along with the results obtained during FY 1993

  13. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  15. Monitoring outcomes of environmental service provision in low socio-economic indigenous Australia using innovative CyberTracker Technology

    Directory of Open Access Journals (Sweden)

    E J Ens

    2012-01-01

    Full Text Available Payments for environmental services (PES are increasingly promoted as an economic mechanism that could potentially address socio-economic and environmental conservation objectives in developing regions. However, the reporting and conditionality requirements of PES projects can be inhibitory, particularly for people with low environmental monitoring or administration capacity. Here, I provide five case studies where Indigenous Land and Sea Management groups in remote northern Australia, have combined Indigenous ecological knowledge, Western science, and the innovative CyberTracker technology to record and monitor the ecological outcomes of their land management activities to facilitate engagement with mainstream economies in Australia. The case studies elucidate methods of data collection and recording for established and potential PES projects where environmental monitoring and adaptive land and sea management are clear objectives, with longer term prospects for socio-economic benefits of Indigenous community education, empowerment and development. Similar monitoring and reporting methods could be applied in other contexts where individuals or community groups want to engage in emerging mainstream environmental service markets, but lack environmental monitoring and reporting capacity, such as other Indigenous groups, people from economically poor regions, or farmers in environmentally valuable regions.

  16. Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    Waste Area Grouping (WAG) 6 is a hazardous and low-level radioactive waste disposal site at Oak Ridge National Laboratory (ORNL). Extensive site investigations have revealed contaminated surface water, sediments, groundwater, and soils. Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) conducted from 1989--1991 and on recent interactions with the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC), a decision was made to defer implementing source control remedial measures at the WAG. The information shows WAG 6 contributes < 2% of the total off-site contaminant risk released over White Oak Dam (WOD). The alternative selected to address hazards at WAG 6 involves maintenance of site access controls to prevent public exposure to on-site contaminants, continued monitoring of contaminant releases to determine if source control measures will be required in the future, and development of technologies to support final remediation of WAG 6. This Quality Assurance Project Plan (QAPjP) has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee (DOE/OR/01-1192 ampersand D1). Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model. The baseline monitoring phase is expected to begin in 1994 and continue for 12-18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC. The routine annual monitoring phase will continue for ∼4 years

  17. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  18. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  19. Identifying Effective and Sustainable Measures for Community-Based Environmental Monitoring

    Science.gov (United States)

    McKay, Ariana J.; Johnson, Chris J.

    2017-09-01

    Resource development projects typically result in monitoring programs that fail to fully consider the values and participation of surrounding communities. Also, monitoring protocols for single environmental values can be insufficient for addressing the cumulative impacts of resource development. Community-based environmental monitoring (CBEM) has emerged as a way to meaningfully include local citizens in the decision-making process and assessment of the development of natural resources. Our research explored how to develop effective and sustainable CBEM. Interviews were conducted with staff from 15 CBEM programs established across Canada to identify criteria of what constitutes effective CBEM. Results demonstrate that CBEM offers an effective, locally adapted, and culturally applicable approach to facilitate community participation in natural resource management and to track environmental change. Benefits of CBEM include: locally relevant monitoring protocols, inclusion of cumulative impacts, better informed decision-making, and increased awareness and collaboration amongst community, governments, and proponents. Challenges associated with CBEM are cost, capacity, longevity, distribution of results, and establishing credibility. This research validates the use of CBEM for improving resource management.

  20. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  1. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  2. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2008-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  3. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  4. Development of a Real-Time Environmental Monitoring System, Life Cycle Assessment Systems, and Pollution Prevention Programs

    Science.gov (United States)

    Kocher, Walter M.

    2003-01-01

    Pollution prevention (P2) opportunities and Greening the Government (GtG) activities, including the development of the Real-Time Environmental Monitoring System (RTEMS), are currently under development at the NASA Glenn Research Center. The RTEMS project entails the ongoing development of a monitoring system which includes sensors, instruments, computer hardware and software, plus a data telemetry system.Professor Kocher has been directing the RTEMS project for more than 3 years, and the implementation of the prototype system at GRC will be a major portion of his summer effort. This prototype will provide mulitmedia environmental monitoring and control capabilities, although water quality and air emissions will be the immediate issues addressed this summer. Applications beyond those currently identified for environmental purposes will also be explored.

  5. Concept for integrated environmental monitoring. Scientific approach

    Energy Technology Data Exchange (ETDEWEB)

    Haber, W [comp.; Schoenthaler, K; Kerner, H F; Koeppel, J; Spandau, L

    1998-09-01

    Despite considerable expenditures for environmental protection and intensified efforts in the areas of environmental research and monitoring, environmental damage increasingly occurs, sometimes with global effects, largely due to the lack of early diagnosis. In the past few years various institutions have therefore demanded improvements in environmental monitoring. The Council of Experts on Environmental Issues (`Rat von Sachverstaendigen fuer Umweltfragen`, SRU), in particular, in its `Environmental Report` of 1987 and in its Special Report on `General Ecological Environmental Monitoring` (1990) presented far-reaching demands for a nationwide ecological early warning system which should integrate the various local, regional, national, and even global monitoring levels, and which should encompass an environmental monitoring of entire ecosystems at representative locations. This is aimed at creating the prerequisites for - detection of long-term gradual environmental change, - confirmation of refutation of initial assumptions regarding the causes of these environmental changes, - permitting decisions on preventive actions to stabilize or improve environmental conditions and - making it possible to assess the success of environmental protection policies. This report includes an abbreviated version and documentation of the conference on the `Concept for Integrated Environmental Monitoring` and the final report `Specification of the Concept for Integrated Environmental Monitoring from the Perspective of Nature Conservation`. (orig.)

  6. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2004-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  7. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  8. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  9. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  10. Environmental monitoring and cooperative resource management at the WIPP site

    International Nuclear Information System (INIS)

    1992-01-01

    This poster session by the Environmental Monitoring Section of the US DOE Waste Isolation Pilot Plant is to demonstrate that the DOE is committed to sound environmental management. This WIPP poster session demonstrates radiological as well as nonradiological environmental monitoring activities conducted routinely at the WIPP. And how data collected prior to the WIPP being operational is used to establish a preoperational baseline for environmental studies in which the samples collected during the operational phase will be compared. Cooperative Resource Management is a relatively new concept for governments agencies. It allows two or more agencies the ability to jointly share in funding a program or project and yet both agencies can benefit from the outcome. These programs are usually a biological type study. The WIPP cooperative agreement between the US BLM, DOE and its contractors is to continue the ongoing documentation of the diversity of the Chihuahuan desert

  11. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  12. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  13. 1984 environmental monitoring report

    International Nuclear Information System (INIS)

    Day, L.E.; Miltenberger, R.P.; Naidu, J.R.

    1985-04-01

    The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. A listing, as required by DOE Order 5484.1 of BNL facilities, of environmental agencies and permits is provided in the Environmental Program Information Section 3.0, Table B. Since the aquifer underlying Long Island has been designated a ''sole source'' aquifer, the Environmental Protection Agency (EPA) Drinking Water Standards have been used in the assessment of ground water data. However, the limits prescribed in the regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply system, i.e., one serving more than 25 individuals, and (2) the standards represent an annual average concentration. Since the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are employed as reference criteria to which the surveillance well data is compared. The standards also serve as guidance levels for any appropriate remedial action. 36 refs., 9 figs., 40 tabs

  14. Radiological environmental monitoring programs at Canadian nuclear facilities - a practical model for follow-up activities under the Canadian Environmental Assessment Act

    International Nuclear Information System (INIS)

    Tamm, J.A.; Zach, R.

    2000-01-01

    Under the Canadian Environmental Assessment Act (the Act), a federal authority, if it considers it appropriate, is to design a follow-up program for a project undergoing a federal environmental assessment and arrange for implementation of that program. Under the Act a follow-up program means a set of activities for verifying the accuracy of the environmental assessment (EA) of a project and for determining the effectiveness of any measures taken to mitigate any adverse environmental effects resulting from the project. The Act currently does not include regulations, guidelines, standards or procedures regarding the design, content and implementation requirements for follow-up programs (Canadian Environmental Assessment Agency [the Agency] 1999). Uncertainties also exist regarding the roles and responsibilities in designing, implementing, enforcing and auditing such activities. The Agency is presently specifying appropriate activities to address these issues. This paper considers the existing radiological environmental monitoring programs at nuclear facilities. Such programs consist of two types of monitoring-radioactivity releases from the facility via liquid and gaseous waste streams, and radioactivity in the environment at large, beyond the facility's immediate location. Such programs have been developed by AECL, Canadian nuclear utilities and uranium mining companies. Our analysis show that these programs can provide a good model for follow-up programs under the Act. (author)

  15. 1988 Monitoring Activities Review (MAR) of the environmental monitoring program

    International Nuclear Information System (INIS)

    1989-03-01

    The EGandG Idaho Environmental Monitoring (EM) Unit is responsible for coordinating and conducting environmental measurements of radioactive and hazardous contaminants around facilities operated by EGandG Idaho. The EM Unit has several broad program objectives, which include complying with regulatory standards and developing a basis for estimating future impacts of operations at EGandG Idaho facilities. To improve program planning and to provide bases for technical improvement of the monitoring program, the EGandG Environmental Monitoring organization has regularly used the Monitoring Activities Review (MAR) process since 1982. Each MAR is conducted by a committee of individuals selected for their experience in the various types of monitoring performed by the EM organization. Previous MAR studies have focused on procedures for all currently monitored media except biota. Biotic monitoring was initiated following the last MAR. This report focuses on all currently monitored media, and includes the first review of biotic monitoring. The review of biotic monitoring has been conducted at a level of detail consistent with initial MAR reports for other parts of the Waste Management Program Facilities Environmental Monitoring Program. The review of the biotic monitoring activities is presented in Section 5.5 of this report. 21 refs., 7 figs., 4 tabs

  16. Environmental impact assessments of the Three Gorges Project in China: Issues and interventions

    Science.gov (United States)

    Xu, Xibao; Tan, Yan; Yang, Guishan

    2013-09-01

    The paper takes China's authoritative Environmental Impact Statement for the Yangzi (Yangtze) Three Gorges Project (TGP) in 1992 as a benchmark against which to evaluate emerging major environmental outcomes since the initial impoundment of the Three Gorges reservoir in 2003. The paper particularly examines five crucial environmental aspects and associated causal factors. The five domains include human resettlement and the carrying capacity of local environments (especially land), water quality, reservoir sedimentation and downstream riverbed erosion, soil erosion, and seismic activity and geological hazards. Lessons from the environmental impact assessments of the TGP are: (1) hydro project planning needs to take place at a broader scale, and a strategic environmental assessment at a broader scale is necessary in advance of individual environmental impact assessments; (2) national policy and planning adjustments need to react quickly to the impact changes of large projects; (3) long-term environmental monitoring systems and joint operations with other large projects in the upstream areas of a river basin should be established, and the cross-impacts of climate change on projects and possible impacts of projects on regional or local climate considered.

  17. Environmental monitoring programme

    International Nuclear Information System (INIS)

    1991-08-01

    During 1989 there were about 1000 premises in England and Wales authorised to discharge radioactive wastes. The majority of these premises consisted of hospitals, universities and industrial, research or manufacturing centres. Discharges from these premises when made in accordance with the strict conditions specified in their authorisations will have been of little radiological significance. In the case of nuclear sites authorisations or approvals are issued jointly by the DoE and the Ministry of Agriculture, Fisheries and Food (MAFF) known collectively as the Authorising Departments. In Wales these functions are undertaken by the Welsh Office with the support of HMIP and MAFF. The Authorising Departments specify numerical limits on the amounts of radioactivity which operators may discharge to the environment. In addition operators are required to demonstrate that the best practicable means (BPM) to minimise discharges is undertaken. Operators are also required to carry out appropriate environmental monitoring to demonstrate the effectiveness of BPM. As part of their regulatory functions the Authorising Departments undertake their own environmental monitoring programmes to act as both a check on site operator's returns and to provide independent data on the exposure of the public. HM Inspectorate of Pollution has monitored levels of radioactivity in drinking water sources for many years and published results annually. MAFF undertakes two programmes to monitor radioactivity in the aquatic environment and in terrestrial foodstuffs and publishes annual reports. Environmental monitoring programmes undertaken by both nuclear site operators and government departments are summarised. (author)

  18. Savannah River Plant remote environmental monitoring system

    International Nuclear Information System (INIS)

    Schubert, J.F.

    1987-01-01

    The SRP remote environmental monitoring system consists of separations facilities stack monitors, production reactor stack monitors, twelve site perimeter monitors, river and stream monitors, a geostationary operational environmental satellite (GOES) data link, reactor cooling lake thermal monitors, meteorological tower system, Weather Information and Display (WIND) system computer, and the VANTAGE data base management system. The remote environmental monitoring system when fully implemented will provide automatic monitoring of key stack releases and automatic inclusion of these source terms in the emergency response codes

  19. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  20. Environmental monitoring six month report for the Tumulus Disposal Demonstration Project

    International Nuclear Information System (INIS)

    Yager, R.E.; Furnari, J.A.; Craig, P.M.

    1989-05-01

    The Fiscal Year 1989 Six Month Report is the fourth in a series of semi-annual Tumulus Disposal Demonstration Project (TDDP) data summary reports. This data summary spans the time from start of operations in June 1987 through the end of March 1989 with particular emphasis on the last six months: October 1988 through March 1989. The environmental data collected include run-off water quality and quantity, groundwater quality and levels, soil sampling and hydrometeorological data. These data are being used and analyzed here to demonstrate the environmental performance objectives for the TDDP as part of the overall performance assessment. Comparisons are made between pre- and post-operational data and data collected during size month period ending March 31, 1989. No significant environmental impacts have been found since operations have begun. 13 refs., 28 figs., 12 tabs

  1. Visualizing Earth Science Data for Environmental Monitoring and Decision Support in Mesoamerica: The SERVIR Project

    Science.gov (United States)

    Hardin, D.; Graves, S.; Sever, T.; Irwin, D.

    2005-05-01

    In 2002 and 2003 NASA, the World Bank and the United States Agency for International Development (USAID) joined with the Central American Commission for Environment and Development (CCAD) to develop an advanced decision support system for Mesoamerica (named SERVIR). Mesoamerica - composed of the seven Central American countries and the five southernmost states of Mexico - makes up only a small fraction of the world's land surface. However, the region is home to approximately eight percent of the planet's biodiversity (14 biosphere reserves, 31 Ramsar sites, 8 world heritage sites, 589 protected areas) and 45 million people including more than 50 different ethnic groups. Mesoamerica's biological and cultural diversity are severely threatened by human impact and natural disasters including extensive deforestation, illegal logging, water pollution, slash and burn agriculture, earthquakes, hurricanes, drought, and volcanic eruption. NASA Marshall Space Flight Center (NASA/MSFC), together with the University of Alabama in Huntsville (UAH) and the SERVIR partners are developing state-of-the-art decision support tools for environmental monitoring as well as disaster prevention and mitigation in Mesoamerica. These partners are contributing expertise in space-based observation with information management technologies and intimate knowledge of local ecosystems to create a system that is being used by scientists, educators, and policy makers to monitor and forecast ecological changes, respond to natural disasters, and better understand both natural and human induced effects. The decision support and environmental monitoring data products are typically formatted as conventional two-dimensional, static and animated imagery. However, in addition to conventional data products and as a major portion of our research, we are employing commercial applications that generate three-dimensional interactive visualizations that allow data products to be viewed from multiple angles and at

  2. A project for monitoring trends in burn severity

    Science.gov (United States)

    Eidenshink, Jeffery C.; Schwind, Brian; Brewer, Ken; Zhu, Zhu-Liang; Quayle, Brad; Howard, Stephen M.

    2007-01-01

    Jeff Eidenshink, Brian Schwind, Ken Brewer, Zhi-Liang Zhu, Brad Quayle, and Elected officials and leaders of environmental agencies need information about the effects of large wildfires in order to set policy and make management decisions. Recently, the Wildland Fire Leadership Council (WFLC), which implements and coordinates the National Fire Plan (NFP) and Federal Wildland Fire Management Policies (National Fire Plan 2004), adopted a strategy to monitor the effectiveness of the National Fire Plan and the Healthy Forests Restoration Act (HFRA). One component of this strategy is to assess the environmental impacts of large wildland fires and identify the trends of burn severity on all lands across the United States. To that end, WFLC has sponsored a six-year project, Monitoring Trends in Burn Severity (MTBS), which requires the U.S. Department of Agriculture Forest Service (USDA-FS) and the U.S. Geological Survey (USGS) to map and assess the burn severity for all large current and historical fires. Using Landsat data and the differenced Normalized Burn Ratio (dNBR) algorithm, the USGS Center for Earth Resources Observation and Science (EROS) and USDA-FS Remote Sensing Applications Center will map burn severity of all fires since 1984 greater than 202 ha (500ac) in the east, and 404 ha (1,000 ac) in the west. The number of historical fires from this period combined with current fires occurring during the course of the project will exceed 9,000. The MTBS project will generate burn severity data, maps, and reports, which will be available for use at local, state, and national levels to evaluate trends in burn severity and help develop and assess the effectiveness of land management decisions. Additionally, the information developed will provide a baseline from which to monitor the recovery and health of fire-affected landscapes over time. Spatial and tabular data quantifying burn severity will augment existing information used to estimate risk associated with a range

  3. A Peer Review of the RPII Environmental Monitoring Programme

    International Nuclear Information System (INIS)

    Mitchell, P.; Hunt, J.; Ledgerwood, K.; Nielsen, S.; O'Donnell, C

    2009-12-01

    The RPII has since the early 1980s carried out an environmental monitoring programme covering radioactivity in air, food and water. The primary focus of this programme has been the assessment of human exposure and the protection of human health. The programme aims to meet Irish and European Union legal requirements, other national and international commitments and to support the RPII's advisory and information provision functions. In 2009 the RPII had the scope and effectiveness of its monitoring programme reviewed by an international peer group. This report provides the background to the review; an overview of the documents provided to the peer group for conduction of the review; and the comments and recommendations by the peer group. The key objectives of the review was to consider whether the RPII environmental monitoring programme is meeting the stated aims and objectives and to provide recommendations for improvement if required. This exercise is part of a continual process of review and improvement of the RPII's monitoring programme. It addresses both continuous monitoring and project based elements of the programme. It was designed to be conducted at a strategic rather than an operational level

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This Annual Site Environmental Report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2003 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. During 2003, cleanup of radioactive waste from the former nuclear fuels reprocessing plant that shut down operations in the 1970s was continued at the WVDP. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority. Work activities at the WVDP during 2003 included: (1) maintaining canisters of vitrified high-level waste in a shielded facility; (2) shipping low-level radioactive waste offsite for disposal; (3) shipping packaged spent nuclear fuel assemblies to Idaho National Engineering and Environmental Laboratory; (4) constructing a facility where large high-activity components can be safely size-reduced and packaged for disposal; (5) decontaminating the fuel storage pool and the cask unloading pool; (6) decontaminating the general purpose cell and the process mechanical cell (also referred to as the head end cells); (7) cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (8) planning for decontamination and dismantlement of the vitrification facility; (9) continuing preparation of the Decommissioning and/or Long-Term Stewardship Environmental Impact Statement; and (10) monitoring the environment and managing contaminated areas within the Project facility premises

  5. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-12-31

    This report contains environmental monitoring information for the following UMTRA sites for the 1992 Calendar Year: Lakeview, OR; Lowman, ID; Mexican Hat, UT; Monument Valley, AZ; Rifle, CO; Riverton, WY; Shiprock, NM; Spook, WY; Tuba City, AZ. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  6. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 2

    International Nuclear Information System (INIS)

    1993-01-01

    This report contains environmental monitoring information for the following UMTRA sites for the 1992 Calendar Year: Lakeview, OR; Lowman, ID; Mexican Hat, UT; Monument Valley, AZ; Rifle, CO; Riverton, WY; Shiprock, NM; Spook, WY; Tuba City, AZ. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information

  7. Urban observatories opportunities for environmental monitoring: solid wastes.

    Science.gov (United States)

    Rojas-Caldelas, R I; Corona Zambrano, E A

    2008-01-01

    Towns concentrate around 50% of world-wide population and the trend is oriented to underscore an urban profile of population. In addition, towns have become important for their economic contribution to the Gross Internal Product. The negative side of towns is the environmental and social impacts as a result of productive and domestic activities, besides the lack of available data. In order to overcome these shortcomings, the United Nations has established a project of urban monitoring throughout the Global Network of Urban Observatories; Mexico joined the project in 2005. The Local Urban Observatory of Mexicali has the task to produce information about cities that is useful to design public policies. Some of this information deals with a set of environmental indicators in the United Nations Habitat Agenda, which includes solid wastes. Therefore, this paper deals with two main topics; firstly, from the Habitat Agenda, a comparative urban analysis of waste production and coverage of domestic waste collection services; secondly, from the Local Agenda, the identification and ranking of environmental problems according to public perception coming from people involved in the municipal planning and decision making process. Results will be used to develop local indicators and public environmental policies.

  8. Environmental and process monitoring technologies

    International Nuclear Information System (INIS)

    Vo-Dinh, Tuan

    1993-01-01

    The objective of this conference was to provide a multidisciplinary forum dealing with state-of-the-art methods and instrumentation for environmental and process monitoring. In the last few years, important advances have been made in improving existing analytical methods and developing new techniques for trace detection of chemicals. These monitoring technologies are a topic of great interest for environmental and industrial control in a wide spectrum of areas. Sensitive detection, selective characterization, and cost-effective analysis are among the most important challenges facing monitoring technologies. This conference integrating interdisciplinary research and development was aimed to present the most recent advances and applications in the important areas of environmental and process monitoring. Separate abstracts have been prepared for 34 papers for inclusion in the appropriate data bases

  9. Monitoring: The missing piece

    Energy Technology Data Exchange (ETDEWEB)

    Bjorkland, Ronald, E-mail: r_bjorkland@hotmail.com

    2013-11-15

    The U.S. National Environmental Policy Act (NEPA) of 1969 heralded in an era of more robust attention to environmental impacts resulting from larger scale federal projects. The number of other countries that have adopted NEPA's framework is evidence of the appeal of this type of environmental legislation. Mandates to review environmental impacts, identify alternatives, and provide mitigation plans before commencement of the project are at the heart of NEPA. Such project reviews have resulted in the development of a vast number of reports and large volumes of project-specific data that potentially can be used to better understand the components and processes of the natural environment and provide guidance for improved and efficient environmental protection. However, the environmental assessment (EA) or the more robust and intensive environmental impact statement (EIS) that are required for most major projects more frequently than not are developed to satisfy the procedural aspects of the NEPA legislation while they fail to provide the needed guidance for improved decision-making. While NEPA legislation recommends monitoring of project activities, this activity is not mandated, and in those situations where it has been incorporated, the monitoring showed that the EIS was inaccurate in direction and/or magnitude of the impact. Many reviews of NEPA have suggested that monitoring all project phases, from the design through the decommissioning, should be incorporated. Information gathered though a well-developed monitoring program can be managed in databases and benefit not only the specific project but would provide guidance how to better design and implement future activities designed to protect and enhance the natural environment. -- Highlights: • NEPA statutes created profound environmental protection legislative framework. • Contrary to intent, NEPA does not provide for definitive project monitoring. • Robust project monitoring is essential for enhanced

  10. Environmental monitoring and information systems

    International Nuclear Information System (INIS)

    Gibbert, R.

    1998-01-01

    Environmental monitoring and information systems installed by Dornier are summarized. A broad spectrum of environmental areas from air quality and water to radioactivity is covered. Nuclear power plant monitoring systems, either as remote or plant-internal monitoring systems, form an important element of the work undertaken. The systems delivered covered local, regional or national areas. The range of services provided, and hardware and software platforms are listed. (R.P.)

  11. Environmental Monitoring Plan, Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    Holland, R.C.

    1992-06-01

    This Environmental Monitoring Plan was written to fulfill the requirements of DOE Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories, Livermore. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 61 refs

  12. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  13. Environmental monitoring in Finland 2006-2008

    International Nuclear Information System (INIS)

    Niemi, J.

    2006-01-01

    This publication presents environmental monitoring carried out in Finland in 2006-2008. It is a summary of the environmental monitoring activities of the following national institutes: Geological Survey of Finland, Finnish Meteorological Institute, National Public Health Institute, Plant Production Inspection Centre, Finnish Museum of Natural History, Agrifood Research Finland, Finnish Institute of Marine Research, Finnish Forest Research Institute, Information Centre of the Ministry of Agriculture and Forestry, Finnish Game and Fisheries Research Institute, Radiation and Nuclear Safety Authority, Ministry of Social Affairs and Health, Statistics Finland, Finnish Environment Institute, and Regional Environment Centres. Monitoring of natural resources, environmental pressures, state of the environment, water and health, land use and environmental policy are presented. The objective was to compile the information on national environmental monitoring and to activate information exchange and cooperation in this field. (orig.)

  14. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  15. Environmental radioactivity monitoring in Greece

    International Nuclear Information System (INIS)

    Maltezos, A.; Potiriadis, C.; Aravantinos, A.

    1997-01-01

    Greek Atomic Energy Commission (GAEC) is the national organization responsible for the environmental radioactivity measurements in Greece. In order to monitor the radioactivity, 12 stations were placed all over Greece. Each station is equipped with NaI detector, measuring daily the total gamma dose rates. After the Chernobyl experience many countries have installed dense automatic networks, for measuring environmental radioactivity and serving as an early warning systems. In Greece a small telemetric network of two stations was installed in Athens area as a pilot project. Each station consists of two GM detectors (for low and high dose rate respectively). Data are collected for every ten minutes sampling time. Regration time of one hour is obtained. In case of level one and level two alarm states, the sampling time intervals are ten and one minutes respectively. The measurements are obtained by the above stations using the lines of the telephone network, and stored in the central station. Financial support to upgrade the existing telemetric system was assured by the addition of 25 new telemetric stations which will cover madly the northern part bordering to other states with nuclear power plants.In order to complete the network, we plan to add more stations to measure the gamma dose rates spread all over Greece, and also monitor river water. (authors)

  16. ERMS - Environmental Radiation Monitoring System

    International Nuclear Information System (INIS)

    Vax, Eran; Sarusi, Benny; Sheinfeld, Mati; Levinson, Shmuel; Brandys, Irad; Sattinger, Danny; Wengrowicz, Udi; Tshuva, Avi; Tirosh, Dan

    2008-01-01

    A new Environmental Radiation Monitoring System (ERMS) has been developed in the NRCN as an extensive tool to be applied in case of nuclear malfunction or Nuclear Disposal Device (NDD) incident, as well as for routine radiation monitoring of the reactor's vicinity. The system collects real-time environmental data such as: gamma radiation, wind speed, wind direction, and temperature for monitoring purposes. The ERMS consists of a main Control Center and an array of monitoring stations. Fixed, environmental, gamma radiation monitoring stations are installed at the reactor's surroundings while portable stations can be posted rapidly along the wind direction, enhancing the spatial sampling of the radiation measurements and providing better hazard assessment at an emergency event. The presented ERMS, based on industrial standards for hardware and network protocols, is a reliable standalone system which upgrades the readiness to face a nuclear emergency event by supplying real-time, integrated meteorological and radiation data. (author)

  17. Water Quality Monitoring: An Environmental Studies Unit for Biology 20/30. Teacher's Guide.

    Science.gov (United States)

    Alberta Environment, Edmonton. Environmental Education Resources Branch.

    The objective of this environmental studies unit is to establish a water quality monitoring project for high school students in Alberta while simultaneously providing a unit which meets the objectives of the Biology 20 program (and which may also be used in Biology 10 and 30). Through this project, students assist in the collection,…

  18. Water Quality Monitoring: An Environmental Studies Unit for Biology 20/30. Student Manual.

    Science.gov (United States)

    Alberta Environment, Edmonton. Environmental Education Resources Branch.

    The objective of this environmental studies unit is to establish a water quality monitoring project for high school students in Alberta while simultaneously providing a unit which meets the objectives of the Biology 20 program (and which may also be used in Biology 10 and 30). Through this project, students assist in the collection,…

  19. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  20. Review report 2003. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-09-15

    The present review report presents the two wind farms Homs Rev and Nysted, with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on methods, programmes and conclusions can be found in these reports. This review report is divided into two parts. The first part contains a description of the potential environmentally impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Hors Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated at the bdsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  1. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  2. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  3. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  4. A Service-Learning Project in Chemistry: Environmental Monitoring of a Nature Preserve

    Science.gov (United States)

    Kammler, David C.; Truong, Triet M.; VanNess, Garrett; McGowin, Audrey E.

    2012-01-01

    A collaborative environmental service-learning project was implemented between upper-level undergraduate science majors and graduate chemistry students at a large state school and first-year students at a small private liberal arts college. Students analyzed the water quality in a nature preserve by determining the quantities of 12 trace metals,…

  5. UNOCAL Parachute Creek Shale Oil Program. Environmental Monitoring Plan - supplemental environmental. Volume 1. Trip 2 report. Rept. for 1988-90

    International Nuclear Information System (INIS)

    1991-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The report contains results of three years of supplemental environmental sampling (Trial Trip, 1988; Trip 1, 1989; and Trip 2, 1990); Trip 2 sampling and analytical methods; quality assurance and quality control procedures; sampling and analytical methods; and corrected data from 1988 and 1989 gas and particulate concentrations

  6. Optimization of environmental monitoring

    International Nuclear Information System (INIS)

    Winter, M.

    1986-01-01

    The routine work and tasks related to prevention in environmental monitoring of nuclear facilities range from low level methodology to the necessity of being likewise prepared to perform environmental impact measurements after nuclear incidents and accidents are presented [pt

  7. 1985 environmental monitoring report

    Energy Technology Data Exchange (ETDEWEB)

    Day, L.E.; Miltenberger, R.P.; Naidu, J.R. (eds.)

    1986-04-01

    The environmental monitoring program is designed to determine that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. The data were evaluated using the appropriate environmental regulatory criteria. The environmental levels of radioactivity and other pollutants found in the vicinity of BNL during 1985 are summarized in this report. Detailed data are not included in the main body of the report, but are tabulated and presented in Appendix D. The environmental data include external radiation levels; radioactive air particulates; tritium concentrations; the amounts and concentrations of radioactivity in and the water quality of the stream into which liquid effluents are released; the water quality of the potable supply wells; the concentrations of radioactivity in biota from the stream; the concentrations of radioactivity in and the water quality of ground waters underlying the Laboratoy; concentrations of radioactivity in milk samples obtained in the vicinity of the Laboratory; and the 1984 strontium-90 data which was not available for inclusion in the 1984 Environmental Monitoring Report. In 1985, the results of the surveillance program demonstraed that the Laboratory has operated within the applicable environmental standards.

  8. Enlisting qualitative methods to improve environmental monitoring

    Science.gov (United States)

    Environmental monitoring tracks ecological changes in order to support environmental management decisions. Monitoring design is driven by natural scientists, usually lacking a formal social science basis. However, human perspectives drive environmental resource decisions, with ...

  9. Survey monitoring of environmental radioactivity in Daegu area

    International Nuclear Information System (INIS)

    Kang, Hee Dong; Lee, Hae Young; Yang, Chan Sun

    2001-12-01

    The objectives of the project are to monitor an abnormal radiation level in Taegu and Kyungpook region, and to enhance our ability to prepare for the radiological emergency situation by establishing the radioactivity monitoring system in Taegu and Kyungpook region. In this report, we summarized a gamma exposure rates, a gross beta and gamma radionuclide activities for the environmental samples of airborned-dust. precipitation, fallout and tap water collected in Taegu radioactivity monitoring center, and a gamma radionuclide activities for the 28 grocery samples, such as tea, nut and mushroom, rice, chinese cabbage, wormwood and pine needles, soil and drinking water which were obtained from Taegu and Kyungpook region to establish the basic data base for estimating the internal exposure. In conclusion, it didn't appear any evidence for newly pollution of artificial radioactivity in Taegu and Kyungpook region

  10. Environmental monitoring with advanced data transfer and presentation techniques

    International Nuclear Information System (INIS)

    Toivonen, H.; Lahtinen, J.; Koivukoski, J.; Rantanen, H.; Haaslahti, J.

    1995-01-01

    In an emergency, the needs for information are overwhelming, as was shown during the Chernobyl accident in 1986. To improve environmental radiation monitoring and to make communication easy, the Finnish authorities launched an extensive development project in 1991. VTKK Group Ltd took over the software design. A brief description of system architecture, automatic data collection, manual input, mobile units, transfer of results and handling of alarms is given. 2 figs

  11. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  12. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends.

  13. 1996 LMITCO environmental monitoring program report for the Idaho National Engineering and Environmental Laboratory

    International Nuclear Information System (INIS)

    1997-09-01

    This report describes the calendar year 1996 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory (INEEL). Results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs are included in this report. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of human health and the environment. This report compares 1996 data with program-specific regulatory guidelines and past data to evaluate trends

  14. Landscape scale ecological monitoring as part of an EIA of major construction activities: experience at the Turkish section of the BTC crude oil pipeline project.

    Science.gov (United States)

    Sahin, Sükran; Kurum, Ekrem

    2009-09-01

    Ecological monitoring is a complementary component of the overall environmental management and monitoring program of any Environmental Impact Assessment (EIA) report. The monitoring method should be developed for each project phase and allow for periodic reporting and assessment of compliance with the environmental conditions and requirements of the EIA. Also, this method should incorporate a variance request program since site-specific conditions can affect construction on a daily basis and require time-critical application of alternative construction scenarios or environmental management methods integrated with alternative mitigation measures. Finally, taking full advantage of the latest information and communication technologies can enhance the quality of, and public involvement in, the environmental management program. In this paper, a landscape-scale ecological monitoring method for major construction projects is described using, as a basis, 20 months of experience on the Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline Project, covering Turkish Sections Lot B and Lot C. This analysis presents suggestions for improving ecological monitoring for major construction activities.

  15. Technological developments for environmental monitoring and assessment at PETROBRAS; O desenvolvimento de tecnologia de avaliacao e monitoramento ambiental na PETROBRAS

    Energy Technology Data Exchange (ETDEWEB)

    Guimaraes, Pedro Penido D.; Veiga, Leticia Falcao [PETROBRAS, Rio de Janeiro, RJ (Brazil); Borges, Heloisa V.

    2004-07-01

    Since 2000 PETROBRAS adopted strategies and actions to establish excellence in Environmental Management and Operational Safety - PEGASO, having invested around 6.1 billions of reais in the last four years to reduce emissions, residues, effluents, and to improve prevention and accident control in its units. In this context, PETROBRAS Research and Development Center has been expanding knowledge about the ecosystems where the company operates, providing essential information to evaluate viability and sustainability on its enterprises, as well as for environmental licensing. Reinforcing its corporative strategy, it was created in 2002 the Environmental Assessment and Monitoring Section, a group that counts nowadays with 48 professionals. This group develops technology and methodology for monitoring in social and environmental context for the petroleum industry, gas and energy, evaluating the impacts of PETROBRAS activities and products life cycle, contributing for reduction of negative effects and to improve the company's environmental management. The research areas are: land, coastal and marine ecosystems monitoring, atmospheric monitoring and air quality, environmental chemistry, ecotoxicology, social and economic evaluation and environmental damage valuation. Working partnerships with the scientific community established several contacts with Brazilian and international universities. Among these various projects related to activities in the Brazilian offshore we present some aspects of the project Campos Basin Deep Sea Environmental Monitoring. (author)

  16. Integrated environmental control and monitoring in the intelligent workplace. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This project involved the design and engineering of the control and monitoring of environmental quality - visual, thermal, air - in the Intelligent Workplace. The research objectives were to study the performance of the individual systems, to study the integration issues related to each system, to develop a control plan, and to implement and test the integrated systems in a real setting. In this project, a control strategy with related algorithms for distributed sensors, actuators, and controllers for negotiating central and individual control of HVAC, lighting, and enclosure was developed in order to maximize user comfort, and energy and environmental effectiveness. The goal of the control system design in the Intelligent Workplace is the integration of building systems for optimization of occupant satisfaction, organizational flexibility, energy efficiency and environmental effectiveness. The task of designing this control system involves not only the research, development and demonstration of state-of-the-art mechanical and electrical systems, but also their integration. The ABSIC research team developed functional requirements for the environmental systems considering the needs of both facility manager and the user. There are three levels of control for the environmental systems: scheduled control, sensor control, and user control. The challenges are to achieve the highest possible levels of energy effectiveness simultaneously with the highest levels of user satisfaction. The report describes the components of each system, their implementation in the Intelligent Workplace and related control and monitoring issues.

  17. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    International Nuclear Information System (INIS)

    1993-01-01

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information

  18. Uranium Mill Tailings Remedial Action Project Annual Environmental Monitoring Report calendar year 1992: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-12-31

    This report describes environmental monitoring and compliance at eight UMTRA sites where remedial action was underway during 1992 and at the ten sites that were complete at the end of 1992. Volume I contains information for Ambrosia Lake, NM; Cannonsburg/Burrell, PA; Durango, CO; Falls City, TX; Grand Junction, CO; Green River, UT; and Gunnison, CO. Each site report contains a site description, compliance summary, environmental program information, environmental radiological and non-radiological program information, water resources protection, and quality assurance information.

  19. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nordstrom, Jenifer [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  20. Environmental monitoring activities in JAERI at JCO accident

    International Nuclear Information System (INIS)

    Yamaguchi, Takenori

    2001-01-01

    The Japan Atomic Energy Research Institute (JAERI) was involved in a various environmental monitoring activities, such as environmental radiation monitoring by monitoring post and monitoring car, air dust, soil, green vegetables and water sampling and measurements, neutron and gamma radiation dose rate survey around the JCO site for emergency response actions to the JCO accident on September 30, 1999. These activities were performed from Sep. 30 to Oct. 2, and were the initial and first stage activities in the emergency environmental monitoring activities. JAERI has been assigned to the public organization to support the government by Disaster Prevention Fundamental Law. These activities were performed to ensure the public safety to avoid the effluent of the accident. Through the environmental monitoring activities, I recognized that the importance of the accident information to make the best use for the initial environmental monitoring, and the monitoring information exchange is important to perform the effective monitoring activities for taking the early countermeasures such as evacuation to the public. (author)

  1. Application of environmental impact assessment in Spain (1989-2008): the case of Road Projects

    International Nuclear Information System (INIS)

    Barbero Rodriguez, J.; Espigares Pinilla, T.

    2010-01-01

    In this study we analyze the application in Spain of the Environmental Impact Assessment (EIA) along the first 20 years since its implementation, paying special attention to road projects. We revised all Environmental Impact Statement (EISs) published during the period 1989-2008 and monitored, among others, the following variables; the record of decision (favorable or unfavorable) of the State Authority, the type of ecosystem affected by the projects and the mitigation measures required to the developer to implement the project. The results allow us to evaluate the effectiveness of EIA procedure for road projects and to suggest some practical recommendations to improve the quality of EISs. (Author) 13 refs.

  2. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  3. Evaluation of the EIA system on the Island of Mauritius and development of an environmental monitoring plan framework

    International Nuclear Information System (INIS)

    Ramjeawon, T.; Beedassy, R.

    2004-01-01

    The Environment Protection Act (EPA) in Mauritius provides for the application of an EIA license in respect of undertakings listed in its first schedule. Following the promulgation of the Act in June 1993, the Department of Environment (DOE) is issuing an average of 125 EIA licenses yearly. In general, the review exercise of an environmental impact assessment (EIA) is terminated once the license has been granted. The aim of this project was to evaluate the EIA system in Mauritius and to identify its weaknesses and strengths. One of the main weaknesses, besides the lack of EIA audits, is the absence of EIA follow-up monitoring. It is necessary to distinguish between monitoring done for regulatory purposes (compliance monitoring) and environmental monitoring related to the EIA. With the growth of the tourism industry on the island, coastal development projects have the potential to cause significant environmental impacts . A sample of EIA reports pertaining to this sector was assessed for its quality and follow-up mechanisms. Proposals for the contents of EIA Prediction Audits, Environmental Monitoring Plans (EMP) and the format for an EMP report are made

  4. Monitoring Activities Review action report for the Environmental Monitoring Program

    International Nuclear Information System (INIS)

    Wilhelmsen, R.N.; Wright, K.C.

    1990-12-01

    To improve program planning and to provide bases for technical improvement of the monitoring program, the EG ampersand G Environmental Monitoring (EM) organization has regularly used the Monitoring Activities Review (MAR) process since 1982. Each MAR is conducted by a committee of individuals selected for their experience in the various types of monitoring performed by the EM organization. An MAR of the Environmental Monitoring Program was conducted in 1988. This action report identifies and discusses the recommendations of this MAR committee. This action report also identifies the actions already taken by the EM Unit in response to these recommendations, as well as the actions and schedules to be taken. 10 refs

  5. 1997 LMITCO Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, B.; Street, L.; Wilhelmsen, R.

    1998-09-01

    This report describes the calendar year 1997 environmental surveillance and compliance monitoring activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Radiological Environmental Surveillance, Site Environmental Surveillance, Drinking Water, Effluent Monitoring, Storm Water Monitoring, Groundwater Monitoring, and Special Request Monitoring Programs and compares 1997 data with program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the surveillance and monitoring activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standard, and to ensure protection of human health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends indicating a loss of control or unplanned releases from facility operations. With the exception of one nitrogen sample in the disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond, compliance with permits and applicable regulations was achieved. Data collected by the Environmental Monitoring Program demonstrate that public health and the environment were protected.

  6. Annual site environmental monitoring report for the Waste Isolation Pilot Plant, Calendar year 1985

    International Nuclear Information System (INIS)

    Reith, C.; Prince, K.; Fischer, T.; Rodriguez, A.; Uhland, D.; Winstanley, D.

    1986-04-01

    This is the first Annual Site Environmental Monitoring Report for the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico. The WIPP project is operated by the US Department of Energy (DOE) for the purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes generated by the defense activities of the U.S. Government. The report provides a comprehensive description of environmental activities at WIPP during Calendar Year 1985, including: a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of environmental program information, including an update on the status of environmental permits and compliance activities; a presentation of the findings of the Radiological Baseline Program (RBP), which is a program to characterize radionuclide activities in the environment around the WIPP site; and a summary of findings of the Ecological Monitoring Program (EMP), which examines non-radiological impacts of WIPP construction on the surrounding ecosystem. The WIPP facility is under construction, and will not receive radioactive wastes before October 1988. Therefore, this report describes the status of preoperational (as opposed to operational) environmental activities. 29 refs., 17 figs., 22 tabs

  7. Environmental monitoring by means of remote sensing

    International Nuclear Information System (INIS)

    Theilen-Willige, B.

    1993-01-01

    Aircraft and satellite aerial photographs represent indispensible tools for environmental observation today. They contribute to a systematic inventory of important environmental parameters such as climate, vegetation or surface water. Their great importance lies in the continuous monitoring of large regions so that changes in environmental conditions are quickly detected. This book provides an overview of the capabilities of remote sensing in environmental monitoring and in the recognition of environmental problems as well as of the usefulness of remote sensing data for environmental planning. Also addressed is the role of remote sensing in the monitoring of natural hazards such as earthquakes and volcano eruptions as well as problems of remote sensing technology transfer to developing countries. (orig.) [de

  8. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  9. RadNet (Environmental Radiation Ambient Monitoring System)

    Data.gov (United States)

    U.S. Environmental Protection Agency — RadNet, formerly Environmental Radiation Ambient Monitoring System (ERAMS), is a national network of monitoring stations that regularly collect air, precipitation,...

  10. Improving ecological response monitoring of environmental flows.

    Science.gov (United States)

    King, Alison J; Gawne, Ben; Beesley, Leah; Koehn, John D; Nielsen, Daryl L; Price, Amina

    2015-05-01

    Environmental flows are now an important restoration technique in flow-degraded rivers, and with the increasing public scrutiny of their effectiveness and value, the importance of undertaking scientifically robust monitoring is now even more critical. Many existing environmental flow monitoring programs have poorly defined objectives, nonjustified indicator choices, weak experimental designs, poor statistical strength, and often focus on outcomes from a single event. These negative attributes make them difficult to learn from. We provide practical recommendations that aim to improve the performance, scientific robustness, and defensibility of environmental flow monitoring programs. We draw on the literature and knowledge gained from working with stakeholders and managers to design, implement, and monitor a range of environmental flow types. We recommend that (1) environmental flow monitoring programs should be implemented within an adaptive management framework; (2) objectives of environmental flow programs should be well defined, attainable, and based on an agreed conceptual understanding of the system; (3) program and intervention targets should be attainable, measurable, and inform program objectives; (4) intervention monitoring programs should improve our understanding of flow-ecological responses and related conceptual models; (5) indicator selection should be based on conceptual models, objectives, and prioritization approaches; (6) appropriate monitoring designs and statistical tools should be used to measure and determine ecological response; (7) responses should be measured within timeframes that are relevant to the indicator(s); (8) watering events should be treated as replicates of a larger experiment; (9) environmental flow outcomes should be reported using a standard suite of metadata. Incorporating these attributes into future monitoring programs should ensure their outcomes are transferable and measured with high scientific credibility.

  11. Improving Ecological Response Monitoring of Environmental Flows

    Science.gov (United States)

    King, Alison J.; Gawne, Ben; Beesley, Leah; Koehn, John D.; Nielsen, Daryl L.; Price, Amina

    2015-05-01

    Environmental flows are now an important restoration technique in flow-degraded rivers, and with the increasing public scrutiny of their effectiveness and value, the importance of undertaking scientifically robust monitoring is now even more critical. Many existing environmental flow monitoring programs have poorly defined objectives, nonjustified indicator choices, weak experimental designs, poor statistical strength, and often focus on outcomes from a single event. These negative attributes make them difficult to learn from. We provide practical recommendations that aim to improve the performance, scientific robustness, and defensibility of environmental flow monitoring programs. We draw on the literature and knowledge gained from working with stakeholders and managers to design, implement, and monitor a range of environmental flow types. We recommend that (1) environmental flow monitoring programs should be implemented within an adaptive management framework; (2) objectives of environmental flow programs should be well defined, attainable, and based on an agreed conceptual understanding of the system; (3) program and intervention targets should be attainable, measurable, and inform program objectives; (4) intervention monitoring programs should improve our understanding of flow-ecological responses and related conceptual models; (5) indicator selection should be based on conceptual models, objectives, and prioritization approaches; (6) appropriate monitoring designs and statistical tools should be used to measure and determine ecological response; (7) responses should be measured within timeframes that are relevant to the indicator(s); (8) watering events should be treated as replicates of a larger experiment; (9) environmental flow outcomes should be reported using a standard suite of metadata. Incorporating these attributes into future monitoring programs should ensure their outcomes are transferable and measured with high scientific credibility.

  12. Citizen-based environmental radiation monitoring network

    International Nuclear Information System (INIS)

    Alemayehu, B.; Mckinzie, M.; Cochran, T.; Sythe, D.; Randrup, R.; Lafargue, E.

    2017-01-01

    This paper discusses a Citizen Radiation Monitoring project designed and implemented by the Natural Resources Defense Council . The goal of the project was to implement a radiation monitoring system that provides radiation data accessible to the public. The monitoring system consisted of usage of a radiation detector integrated with near real-time data collection and visualization. The monitoring systems were installed at five different locations and background radiation measurements were taken. The developed monitoring system demonstrated that citizen-based monitoring system could provide accessible radiation data to the general public and relevant to the area where they live. (author)

  13. Survey monitoring of environmental radioactivity in Gangneung area

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Hwa; An, Mi Jung [Gangnung Regional Radiation Monitoring Station, Gangneung (Korea, Republic of)

    2003-12-15

    The objectives of the project are to get a systematic data for the distribution of environmental radioactivity levels in Gangnung provinces, and use them as a baseline data for the health of the peoples. To monitor the environmental radiation/radioactivity, gross beta activities and gamma exposure rate in the airborne-dust, fallout, precipitation and tap water were measured in Gangnung province during the period of January 1 - December 31, 2003. Waters from drinking water reservoirs, agricultural and marine products were sampled and measured by the HPGe(High Purity Ge)detector for the analysis from some selected areas to make sure of the effect of the fallout due to the atmospheric weapons test. The radioactivity in Kangnung was all about the past data.

  14. Survey monitoring of environmental radioactivity in Gangneung area

    Energy Technology Data Exchange (ETDEWEB)

    An, Dong Wan; An, Mi Jeong [Gangnung Regional Radiation Monitoring Station, Gangneung (Korea, Republic of)

    2001-12-15

    The objectives of the project are to get a systematic data for the distribution of environmental radioactivity levels in Gangnung provinces, and use them as a baseline data for the health of the peoples. To monitor the environmental radiation/radioactivity, gross beta activities and gamma exposure rate in the airborne-dust, fallout, precipitation and tap water were measured in Kangnung province during the period of January 1- December 31, 2001. Waters from drinking water reservoirs, agricultural and marine products were sampled and measured by the HPGe(High Purity Ge)detector for the analysis from some selected areas to make sure of the effect of the fallout due to the atmospheric weapons test. The radioactivity in Kangnung was all about the past data.

  15. Survey monitoring of environmental radioactivity in Gangneung area

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Hwa; An, Mi Jung [Gangnung Regional Radiation Monitoring Station, Gangneung (Korea, Republic of)

    2002-12-15

    The objectives of the project are to get a systematic data for the distribution of environmental radioactivity levels in Gangnung provinces, and use them as a baseline data for the health of the peoples. To monitor the environmental radiation/radioactivity, gross beta activities and gamma exposure rate in the airborne-dust, fallout, precipitation and tap water were measured in Kangnung province during the period of January 1- December 31, 2002. Waters from drinking water reservoirs, agricultural and marine products were sampled and measured by the HPGe(High Purity Ge)detector for the analysis from some selected areas to make sure of the effect of the fallout due to the atmospheric weapons test. The radioactivity in Kangnung was all about the past data.

  16. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  17. Environmental monitoring report for calendar year 1985

    International Nuclear Information System (INIS)

    Stencel, J.R.

    1986-05-01

    The results of the environmental monitoring program for CY85 for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. All of the tokamak machines, the Princeton Large Torus (PLT), Princeton Beta Experiment (PBX), and the Tokamak Fusion Test Reactor (TFTR), has a full year of run time. In addition, the S-1 Spheromak and the RF Test Facility were in operation. The phased approach to TFTR environmental monitoring continued with the establishment of locations for off-site monitoring. An environmental committee established in December 1984 reviewed items of environmental importance. During CY85 no adverse effects to the environmental resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable Federal, State, and local environmental regulations

  18. Regional Environmental Monitoring and Assessment Program Data (REMAP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Regional Environmental Monitoring and Assessment Program (REMAP) was initiated to test the applicability of the Environmental Monitoring and Assessment Program...

  19. Real-time environmental monitoring at the Japan Nuclear Cycle Development Institute O-arai Engineering Center. Using the internet to promote safety and environmental transparency

    International Nuclear Information System (INIS)

    Motomatsu, Sheila; Nakashima Inoue, Naoko

    2000-12-01

    The report documents the results of an effort at the Japan Nuclear Cycle Development Institute O-arai Engineering Center (JNC/OEC) to provide via the Internet, in real-time, environmental monitoring data to promote safety and environmental transparency. Provided in Japanese as well as in English, the Internet site provides assurance that OEC nuclear operations are being conducted in a manner that is safe to both people in the surrounding area and the environment. This work conducted by Environmental Monitoring Team of the OEC Safety Administration Section fulfilled the assignment to release data real-time via the Internet tasked by the Information Disclosure Section of the JNC Headquarters Public Relations Division. The work conducted by the visiting exchange scientist fulfilled the experimental portion of Action Sheet 34 of the Agreement between JNC and DOE for Cooperation in Research and Development Concerning Nuclear Material Control and Accounting Measures for Safeguards and Nonproliferation. In Japan, the project for Action Sheet 34 Personnel Exchange on Remote Monitoring and Transparency' entailed both a study and an experiment on how remote monitoring technologies can be used to promote nonproliferation, environmental and safety transparency. Environmental airborne radionuclide monitoring falls under the definition of remote monitoring technology more broadly defined as 'remotely accessed unattended monitoring system technology'. (author)

  20. Radioactivity monitoring of the Turkish Black Sea coast as a part of the IAEA model project 'Marine environmental assessment of the Black Sea region' and nuclear techniques for the environmental management of water resources in Turkey

    International Nuclear Information System (INIS)

    Goktepe, B.G.; Koksal, G.; Gungor, N.; Gungor, E.; Kose, A.; Kucukcezzar, R.; Varinlioglu, A.; Erkol, A.Y.; Karakelle, B.; Osvath, I.; Fowler, S.

    2002-01-01

    A wide scope Regional Technical Co-operation Project RER/2/003 'Marine environmental assessment of the Black Sea region' is implemented by the International Atomic Energy Agency (IAEA) in the period 1995-2001. This project is initiated in response to the needs of participating Member-States - the six Black Sea coastal countries (Bulgaria, Romania, Ukraine, Russian Federation, Georgia and Turkey) to establish capabilities for reliably assessing radionuclides in the Black Sea environment and applying tracer technique to marine pollution studies. The project has various important aspects: Scientifically; one of the major environmental issue radioactivity pollution is addressed. Technically; laboratory capability for transuranic analysis is being developed. Economically; the reversing the ecological deterioration and developing sustainable uses of the Black Sea and its natural resources is one of the major interest. Politically; responsibility of pollution control and rehabilitation plans of six Black Sea countries are addressed thought various conventions and declarations. Socio-economically; fisheries and tourism sectors are expected to benefit. Highlights from the joint radioactivity monitoring program of the project among six Black Sea countries are outlined. Examples from Turkish monitoring work consists of the routine sampling of sea water, algae, mussels, fish samples and beach sand from the selected stations along the Black Sea coast are presented for illustration. Insights gained from the application of nuclear techniques for the 'Pollution Investigation of the Kucukcekmece Lake' and the 'Marine environmental assessment of the Black Sea region' Model Technical Co-operation Project carried out at the Cekmece Nuclear Research Center supporting by the IAEA are presented. Concluding remarks include the vital importance of protection of the water resources within Eurasian countries and the need for strong cooperation among nuclear research centers

  1. Technological and operational structure of the National Automatic Network for Environmental Radiological Monitoring (RENAMORA)

    International Nuclear Information System (INIS)

    Martinez G, E.; Lopez G, M.; Aguirre G, J.; Fabian O, R.; Hernandez A, Y.

    2015-09-01

    The Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) in Mexico is a decentralized body, under the Secretaria de Energia whose main mission is to ensure that activities involving nuclear and radioactive materials as well as ionizing radiation sources are carried out with maximum security, considering the current technological developments. In order to monitor the levels of environmental radiation to which the population is exposed, the CNSNS has established a series of radiological monitoring programs that allow characterize the environmental radiation levels in each zone or region in the country; to identify the occurrence of natural or artificial radiological events, such as nuclear tests and accidents in radioactive or nuclear facilities. The National Automatic Network for Environmental Radiological Monitoring (RENAMORA) project was initiated with the support of the IAEA through MEX9/049 project and its purpose is to have a network of instruments that automatically and in real time, transmit information of the gamma radiological environmental status of the national territory and changes occurring in it. This network provides data such as the speed of ambient dose equivalent, temperature and humidity in different regions of the country. The network is composed of 92 stations that are distributed throughout the national territory. The structure of the stations has evolved since its inception, now allowing detection tasks, data transmission and managing them remotely from the main server, which is located in the CNSNS, which is performed a statistical dose for each monitoring station. Each monitoring station is formed in its current structure by a probe detection of gamma radiation, a communication module and associated electronics, a mini Web server DataGATE, a cellular modem and an interface converter. (Author)

  2. Project 57 Air Monitoring Report: October 1, 2013, through December 31, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mizell, Steve A. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Reno, NV (United States); Shadel, Craig [Desert Research Inst. (DRI), Las Vegas, NV (United States); Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-02-01

    On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory

  3. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  4. 1998 Environmental Monitoring Program Report for the Idaho National Engineering and Environmental Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    L. V. Street

    1999-09-01

    This report describes the calendar year 1998 compliance monitoring and environmental surveillance activities of the Lockheed Martin Idaho Technologies Company Environmental Monitoring Program performed at the Idaho National Engineering and Environmental Laboratory. This report includes results of sampling performed by the Drinking Water, Effluent, Storm Water, Groundwater Monitoring, and Environmental Surveillance Programs. This report compares the 1998 results to program-specific regulatory guidelines and past data to evaluate trends. The primary purposes of the monitoring and surveillance activities are to evaluate environmental conditions, to provide and interpret data, to verify compliance with applicable regulations or standards, and to ensure protection of public health and the environment. Surveillance of environmental media did not identify any previously unknown environmental problems or trends, which would indicate a loss of control or unplanned releases from facility operations. The INEEL complied with permits and applicable regulations, with the exception of nitrogen samples in a disposal pond effluent stream and iron and total coliform bacteria in groundwater downgradient from one disposal pond. Data collected by the Environmental Monitoring Program demonstrate that the public health and environment were protected.

  5. Environmental effects monitoring at Cat Arm Hydraulic Development, Newfoundland, Canada

    International Nuclear Information System (INIS)

    Hill, E.L.

    1988-01-01

    The Cat Arm Dam is located on a plateau of the Long Range Mountains on Newfoundland's Great Northern Peninsula, and the 127 MW unit uses a 387 m head to produce an average of 676 GWh annually. Newfoundland and Labrador Hydro is conducting an environmental effects monitoring program in Cat Arm Reservoir to evaluate environmental impacts of the project. In the addendum to the Environmental Impact Statement of 1981, the utility agreed to a number of actions to mitigate the impacts of construction on fish populations, and to monitor the effects of reservoir creation, including the following. The mercury content of fish flesh, sediments and water would be monitored, and sampling would be undertaken prior to flooding to obtain baseline data, and for at least five years after flooding. The brook trout population would be monitored at various stages in the life of the reservoir in order to detect negative changes for which mitigative strategies could be applied. Alternative spawning habitat would be provided by removing barriers on streams or creating spawning beds if the monitoring program showed that recruitment was falling, and if these methods were ineffective, a compensatory stocking program would be considered. Extensive monitoring would be undertaken of the littoral zones, primary production in the reservoir, and of a number of limnological parameters to document long term changes in the reservoir. Although of academic interest, certain unusual characteristics of the Cat Arm reservoir, such as its low pH and dark colour, reduce its utility as a predictor of changes due to reservoir formation elsewhere in Newfoundland. 15 refs., 1 fig

  6. Elsam. Offshore Wind Farm. Horns Rev. Annual status report for the environmental monitoring programme 1. January 2001 - 31. December 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-10-15

    As a result of the Danish Government's Energy Plan 21 a target of 5,500 MW wind power is to be erected in Denmark by 2030. 4,000 MW of these are to be placed offshore in special pointed areas with minimal impacts on the environment. In 1998 the Danish Ministry of Environment and Energy ordered two power companies, Elsam and Energi E2, to establish each a demonstration wind farm at one of the five pointed areas. The intention was to follow the environmental impacts from the wind farm and to evaluate the possibility of setting up about 1,500 MW in each area with as little impact on the environment as possible. In 1999 the two power companies were given approval to begin pre-studies of each of the two wind farms and the work on the site construction as well as the environmental impact assessment related hereto was initiated. The authorities made a number of requirements for the EIA surveys according to the EU-directive for preparation of EIA reports. In the summer of 2000 the EIA report with project description was submitted to the authorities and the project was approved in the spring of 2001. During the summer and autumn of 2001 orders were placed for the components for the wind farm, i.e. foundations, towers, wind turbines, cables etc. After having finalised the EIA, monitoring programmes of the wind farms were initiated on basis of the results of the surveys carried out during the EIA. This means that continuous surveys have been implemented for most of the environmental parameters from 1999 and till today. This annual status report for 2001 is to present the results from the annual environmental monitoring programme (the baseline studies) at Horns Rev, which form part of the monitoring programme set up for the Horns Rev project. To get a complete picture of the Danish monitoring programme for the national demonstration wind farm project it is necessary to see the report for Horns Rev and for Roedsand as a whole. The report comprises a description of the wind

  7. Elsam. Offshore Wind Farm. Horns Rev. Annual status report for the environmental monitoring programme 1. January 2001 - 31. December 2001

    International Nuclear Information System (INIS)

    2002-10-01

    As a result of the Danish Government's Energy Plan 21 a target of 5,500 MW wind power is to be erected in Denmark by 2030. 4,000 MW of these are to be placed offshore in special pointed areas with minimal impacts on the environment. In 1998 the Danish Ministry of Environment and Energy ordered two power companies, Elsam and Energi E2, to establish each a demonstration wind farm at one of the five pointed areas. The intention was to follow the environmental impacts from the wind farm and to evaluate the possibility of setting up about 1,500 MW in each area with as little impact on the environment as possible. In 1999 the two power companies were given approval to begin pre-studies of each of the two wind farms and the work on the site construction as well as the environmental impact assessment related hereto was initiated. The authorities made a number of requirements for the EIA surveys according to the EU-directive for preparation of EIA reports. In the summer of 2000 the EIA report with project description was submitted to the authorities and the project was approved in the spring of 2001. During the summer and autumn of 2001 orders were placed for the components for the wind farm, i.e. foundations, towers, wind turbines, cables etc. After having finalised the EIA, monitoring programmes of the wind farms were initiated on basis of the results of the surveys carried out during the EIA. This means that continuous surveys have been implemented for most of the environmental parameters from 1999 and till today. This annual status report for 2001 is to present the results from the annual environmental monitoring programme (the baseline studies) at Horns Rev, which form part of the monitoring programme set up for the Horns Rev project. To get a complete picture of the Danish monitoring programme for the national demonstration wind farm project it is necessary to see the report for Horns Rev and for Roedsand as a whole. The report comprises a description of the wind farm

  8. Environmental monitoring of low-level radioactive materials

    International Nuclear Information System (INIS)

    Jester, W.A.; Yu, C.

    1985-01-01

    The authors discuss some of the current rationale behind the environmental monitoring of low-level radioactive materials are as follows: Committee 4 of the International commission on Radiological Protection (ICRP) defined three broad objectives for environmental monitoring: 1) assessment of the actual or potential exposure of humans to radioactive materials or radiation present in their environment or the estimation of the probable upper limits of such exposure; 2) scientific investigation, sometimes related to the assessment of exposures, sometimes to other objectives; 3) improved public relations. Various regulations have been written requiring environmental monitoring to ensure that the public is not being exposed to excessive amounts of radiation from natural sources or from human activities. An example of the monitoring of natural sources of radiation is a requirement of the Environmental Protection Agency's (EPA) National Interim Primary Drinking Water Regulations whereby U.S. water supply companies must have drinking water monitored at least once every four years for radionuclides, primarily the naturally occurring radium-226

  9. Environmental monitoring programme

    International Nuclear Information System (INIS)

    Schroeder, H.J.

    1981-01-01

    The tasks of the radiation protection department at a nuclear power plant are mentioned and described. Special attention is given to the environmental monitoring program. The consequences from regulations, the different items in the program and the results are described. (orig./RW)

  10. Direct Satellite Data Acquisition and its Application for Large -scale Monitoring Projects in Russia

    Science.gov (United States)

    Gershenzon, O.

    2011-12-01

    ScanEx RDC created an infrastructure (ground stations network) to acquire and process remote sensing data from different satellites: Terra, Aqua, Landsat, IRS-P5/P6, SPOT 4/5, FORMOSAT-2, EROS A/B, RADARSAT-1/2, ENVISAT-1. It owns image archives from these satellites as well as from SPOT-2 and CARTOSAT-2. ScanEx RDC builds and delivers remote sensing ground stations (working with up to 15 satellites); and owns the ground stations network to acquire data for Russia and surrounding territory. ScanEx stations are the basic component in departmental networks of remote sensing data acquisition for different state authorities (Roshydromet, Ministry of Natural Recourses, Emercom) and University- based remote sensing data acquisition and processing centers in Russia and abroad. ScanEx performs large-scale projects in collaboration with government agencies to monitor forests, floods, fires, sea surface pollution, and ice situation in Northern Russia. During 2010-2011 ScanEx conducted daily monitoring of wild fires in Russia detecting and registering thermal anomalies using data from Terra, Aqua, Landsat and SPOT satellites. Detailed SPOT 4/5 data is used to analyze burnt areas and to assess damage caused by fire. Satellite data along with other information about fire situation in Russia was daily updated and published via free-access Internet geoportal. A few projects ScanEx conducted together with environmental NGO. Project "Satellite monitoring of Especially Protected Natural Areas of Russia and its results visualization on geoportal was conducted in cooperation with NGO "Transparent World". The project's goal was to observe natural phenomena and economical activity, including illegal, by means of Earth remote sensing data. Monitoring is based on multi-temporal optical space imagery of different spatial resolution. Project results include detection of anthropogenic objects that appeared in the vicinity or even within the border of natural territories, that have never been

  11. Analysis of general specifications for nuclear facilities environmental monitoring vehicles

    International Nuclear Information System (INIS)

    Xu Xiaowei

    2014-01-01

    At present, with the nuclear energy more increasingly extensive application, the continuous stable radiation monitoring has become the focus of the public attention. The main purpose of the environmental monitoring vehicle for the continuous monitoring of the environmental radiation dose rate and the radionuclides concentration in the medium around nuclear facilities is that the environmental radiation level and the radioactive nuclides activity in the environment medium are measured. The radioactive pollution levels, the scope contaminated and the trends of the pollution accumulation are found out. The change trends for the pollution are observed and the monitoring results are explained. The domestic demand of the environmental monitoring for the nuclear facilities is shown in this report. The changes and demands of the routine environmental monitoring and the nuclear emergency monitoring are researched. The revision opinions for EJ/T 981-1995 General specifications for nuclear facilities environmental monitoring vehicles are put forward. The purpose is to regulate domestic environmental monitoring vehicle technical criterion. The criterion makes it better able to adapt and serve the environmental monitoring for nuclear facilities. The technical guarantee is provided for the environmental monitoring of the nuclear facilities. (authors)

  12. Environmental management and monitoring for education building development

    Science.gov (United States)

    Masri, R. M.

    2018-05-01

    The purpose of research were (1) a conceptual, functional model designed and implementation for environmental management and monitoring for education building development, (2) standard operational procedure made for management and monitoring for education building development, (3) assessed physic-chemical, biological, social-economic environmental components so that fulfilling sustainable development, (4) environmental management and monitoring program made for decreasing negative and increasing positive impact in education building development activities. Descriptive method is used for the research. Cibiru UPI Campus, Bandung, West Java, Indonesia was study location. The research was conducted on July 2016 to January 2017. Spatial and activities analysis were used to assess physic-chemical, biological, social-economic environmental components. Environmental management and monitoring for education building development could be decreasing water, air, soil pollution and environmental degradation in education building development activities.

  13. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  14. Environmental monitoring at Hanford for 1986

    International Nuclear Information System (INIS)

    1987-05-01

    Environmental monitoring at the Hanford Site is conducted by the Battelle Memorial Institute, Pacific Northwest Division, as part of its contract to operate the Pacific Northwest Laboratory (PNL) for the US Department of Energy. The data collected provide a historical record of the levels of radionuclides and radiation attributable to natural causes, worldwide fallout, and Hanford operations. Data are also collected to monitor the status of chemical materials on the Site and in the Columbia River. This report represents a single, comprehensive source of environmental monitoring data collected during 1986 by PNL's Environmental monitoring Group in the offsite and onsite environments. Appendix A contains data and data summaries for results obtained during 1986 that include statistical estimates of variation. Information in Appendix A is intended for readers with a scientific interest or for those who wish to evaluate results in a manner not included here. 71 refs., 66 figs., 17 tabs

  15. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  16. Centralized environmental radiation monitoring system in JAERI

    International Nuclear Information System (INIS)

    Katagiri, Hiroshi; Kobayashi, Hideo

    1993-03-01

    Japan Atomic Energy Research Institute (JAERI) has continued the radiation background survey and environmental radiation monitoring to ensure the safety of the residents around the Institute. For the monitoring of β and γ radiations and α and β radioactivities in air, the centralized automatic environmental radiation monitoring system (EMS) applying a computer with monitoring stations (MS) was established. The system has been renewed twice in 1973 and 1988. In 1962, a new concept emergency environmental γ-ray monitoring system (MP) was begun to construct and completed in 1965 independent of EMS. The first renewal of the EMS was carried out by focusing on the rapid and synthetic judgement and estimation of the environmental impacts caused by radiation and radioactive materials due to the operation of nuclear facilities by centralizing the data measured at MS, MP, a meteorological station, stack monitors and drainage monitoring stations under the control of computer. Present system renewed in 1988 was designed to prevent the interruption of monitoring due to computer troubles, communication troubles and power failures especially an instant voltage drop caused by thunder by reflecting the experiences through the operation and maintenance of the former system. Dual telemeters whose power is constantly supplied via batteries (capable of 10 min. monitoring after power failure) are equipped in the monitoring center to cope with telemeter troubles, which has operated successfully without any suspension being attributable to the power failures and telemeter troubles. (J.P.N.)

  17. Protocols for Monitoring Habitat Restoration Projects in the Lower Columbia River and Estuary

    Energy Technology Data Exchange (ETDEWEB)

    Roegner, G. Curtis; Diefenderfer, Heida L.; Borde, Amy B.; Thom, Ronald M.; Dawley, Earl M.; Whiting, Allan H.; Zimmerman, Shon A.; Johnson, Gary E.

    2008-04-25

    Protocols for monitoring salmon habitat restoration projects are essential for the U.S. Army Corps of Engineers' environmental efforts in the Columbia River estuary. This manual provides state-of-the science data collection and analysis methods for landscape features, water quality, and fish species composition, among others.

  18. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  19. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  20. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  1. 4D Near Real-Time Environmental Monitoring Using Highly Temporal LiDAR

    Science.gov (United States)

    Höfle, Bernhard; Canli, Ekrem; Schmitz, Evelyn; Crommelinck, Sophie; Hoffmeister, Dirk; Glade, Thomas

    2016-04-01

    The last decade has witnessed extensive applications of 3D environmental monitoring with the LiDAR technology, also referred to as laser scanning. Although several automatic methods were developed to extract environmental parameters from LiDAR point clouds, only little research has focused on highly multitemporal near real-time LiDAR (4D-LiDAR) for environmental monitoring. Large potential of applying 4D-LiDAR is given for landscape objects with high and varying rates of change (e.g. plant growth) and also for phenomena with sudden unpredictable changes (e.g. geomorphological processes). In this presentation we will report on the most recent findings of the research projects 4DEMON (http://uni-heidelberg.de/4demon) and NoeSLIDE (https://geomorph.univie.ac.at/forschung/projekte/aktuell/noeslide/). The method development in both projects is based on two real-world use cases: i) Surface parameter derivation of agricultural crops (e.g. crop height) and ii) change detection of landslides. Both projects exploit the "full history" contained in the LiDAR point cloud time series. One crucial initial step of 4D-LiDAR analysis is the co-registration over time, 3D-georeferencing and time-dependent quality assessment of the LiDAR point cloud time series. Due to the high amount of datasets (e.g. one full LiDAR scan per day), the procedure needs to be performed fully automatically. Furthermore, the online near real-time 4D monitoring system requires to set triggers that can detect removal or moving of tie reflectors (used for co-registration) or the scanner itself. This guarantees long-term data acquisition with high quality. We will present results from a georeferencing experiment for 4D-LiDAR monitoring, which performs benchmarking of co-registration, 3D-georeferencing and also fully automatic detection of events (e.g. removal/moving of reflectors or scanner). Secondly, we will show our empirical findings of an ongoing permanent LiDAR observation of a landslide (Gresten

  2. The Urban Environmental Monitoring/100 Cities Project: Legacy of the First Phase and Next Steps

    Science.gov (United States)

    Stefanov, William L.; Wentz, Elizabeth A.; Brazel, Anthony; Netzband, Maik; Moeller, Matthias

    2009-01-01

    The Urban Environmental Monitoring (UEM) project, now known as the 100 Cities Project, at Arizona State University (ASU) is a baseline effort to collect and analyze remotely sensed data for 100 urban centers worldwide. Our overarching goal is to use remote sensing technology to better understand the consequences of rapid urbanization through advanced biophysical measurements, classification methods, and modeling, which can then be used to inform public policy and planning. Urbanization represents one of the most significant alterations that humankind has made to the surface of the earth. In the early 20th century, there were less than 20 cities in the world with populations exceeding 1 million; today, there are more than 400. The consequences of urbanization include the transformation of land surfaces from undisturbed natural environments to land that supports different forms of human activity, including agriculture, residential, commercial, industrial, and infrastructure such as roads and other types of transportation. Each of these land transformations has impacted, to varying degrees, the local climatology, hydrology, geology, and biota that predate human settlement. It is essential that we document, to the best of our ability, the nature of land transformations and the consequences to the existing environment. The focus in the UEM project since its inception has been on rapid urbanization. Rapid urbanization is occurring in hundreds of cities worldwide as population increases and people migrate from rural communities to urban centers in search of employment and a better quality of life. The unintended consequences of rapid urbanization have the potential to cause serious harm to the environment, to human life, and to the resulting built environment because rapid development constrains and rushes decision making. Such rapid decision making can result in poor planning, ineffective policies, and decisions that harm the environment and the quality of human life

  3. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    Science.gov (United States)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  4. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  5. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  6. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    International Nuclear Information System (INIS)

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-01-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities

  7. Environmental monitoring report, 1976

    International Nuclear Information System (INIS)

    1977-01-01

    The effluent and environmental monitoring programs maintained by the Pinellas Plant are designed to determine the efficiencies of treatment and control mechanisms; to provide measurements of discharge concentrations for comparison with applicable standards; and to assess the concentrations of these discharges in the environment. Site perimeter and off-site air samples for tritium gas and tritium oxide, as well as off-site surface water samples obtained to distances of 9.6 kilometers (6 miles) from the plant site and analyzed for tritium content, showed levels significantly less than 1 / 10 of 1 percent of the recommended guide for continuous nonoccupational exposure. Small sealed plutonium sources are utilized at this site. No plutonium was released to the environment and monitoring data showed environmental background levels

  8. Environmental monitoring plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1992-09-01

    The Environmental Monitoring Plan (EMP) for the Oak Ridge Reservation (ORR) is an omnibus document providing a single point of reference for the effluent monitoring and environmental surveillance programs of Oak Ridge National Laboratory (ORNL), Y-12 Plant, K-25 Site, and ORR areas outside specific facility boundaries. Authorization and requirement for the EMP are contained in Department of Energy (DOE) Order 5400.1 Chapter 4, which states that environmental monitoring consists of two major activities: effluent monitoring and environmental surveillance. This EMP is intended to document the rationale and design criteria for the effluent monitoring and environmental surveillance programs, extent and frequency of sampling and analysis, analytical laboratory procedures, quality assurance, implementation, and reporting. The EMP describes one of several programs that collect and analyze data to assess the impacts of ORR on the environment and human health. Others include the Environmental Restoration Program and the Clinch River Remedial Investigation Program. While the ultimate goal for DOE may be to integrate information from all these programs into a formalized assessment of risk to ecosystems and human health, that level of integration is beyond the scope of the EMP. The EMP outlines the goals of environmental monitoring for the ORR and its facilities and includes activities that are not presently conducted. In general, the programs described in this EMP represent an increase in surveillance activities over past practices

  9. Environmental Monitoring Plan: Environmental Monitoring Section. Appendix A, Procedures

    International Nuclear Information System (INIS)

    1995-02-01

    This document presents information about the environmental monitoring program at Lawrence Livermore National Laboratory. Topics discussed include: air sampling; air tritium calibrations; storm water discharge; non-storm water discharge; sampling locations; ground water sampling; noise and blast forecasting; analytical laboratory auditing; document retention; procedure writing; quality assurance programs for sampling; soil and sediment sampling; sewage sampling; diversion facility tank sampling; vegetation and foodstuff sampling; and radiological dose assessments

  10. Environmental Monitoring Plan: Environmental Monitoring Section. Appendix A, Procedures

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    This document presents information about the environmental monitoring program at Lawrence Livermore National Laboratory. Topics discussed include: air sampling; air tritium calibrations; storm water discharge; non-storm water discharge; sampling locations; ground water sampling; noise and blast forecasting; analytical laboratory auditing; document retention; procedure writing; quality assurance programs for sampling; soil and sediment sampling; sewage sampling; diversion facility tank sampling; vegetation and foodstuff sampling; and radiological dose assessments.

  11. Integrated environmental monitoring and information system

    International Nuclear Information System (INIS)

    Klinda, J.; Lieskovska, Z.

    1998-01-01

    The concept of the environmental monitoring within the territory of the Slovak Republic and the concept of the integrated environmental information system of the Slovak Republic were accepted and confirmed by the Government Order No. 449/1992. The state monitoring system covering the whole territory of Slovakia is the most important and consists of 13 Partial Monitoring Systems (PMSs). List of PMSs is included. The listed PMSs are managed according to the concept of the Sectoral Information System (SIS) of the Ministry of the Environment of the Slovak Republic (MESR) which was established by the National Council Act No. 261/1995 Coll. on the SIS. The SIS consists of 18 subsystems which are listed. The overviews of budget of PMSs as well as of environmental publications and periodicals of the MESR are included

  12. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  13. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  14. Monitoring in educational development projects : the development of a monitoring system

    NARCIS (Netherlands)

    Plomp, T.; Huijsman, Hari; Kluyfhout, Eric

    1992-01-01

    Monitoring in education is usually focused on the monitoring of educational systems at different levels. Monitoring of educational projects receives only recently explicit attention. The paper discusses first the concepts of educational monitoring and evaluation. After that, the experience with

  15. Environmental radioactivity. Measurement and monitoring

    International Nuclear Information System (INIS)

    2009-11-01

    The contribution on environmental radioactivity covers the following issues: natural and artificial radioactivity; continuous monitoring of radioactivity; monitoring authorities and measurement; radioactivity in the living environment; radioactivity in food and feeding stuff; radioactivity of game meat and wild-growing mushrooms; radioactivity in mines; radioactivity in the research center Rossendorf.

  16. Identification Of Environmental Variables For Use In Monitoring For The Evaluation Of The Rural Environment Protection Scheme – End of Project Report - 5190a

    OpenAIRE

    Finn, John; Kavanagh, Brendan P; Flynn, Maeve

    2005-01-01

    The aim of this study was to identify and select quantitative environmental attributes for a monitoring programme that may be integrated into an environmental evaluation of Ireland’s agri-environmental scheme. This was achieved primarily by reviewing a range of agri-environmental indicators and suggesting indicators that would be appropriate for monitoring the REPS. The study conducted a desk review to collate information on current best practice in monitoring for environmental quality. A Pro...

  17. Real time observation system for monitoring environmental impact on marine ecosystems from oil drilling operations.

    Science.gov (United States)

    Godø, Olav Rune; Klungsøyr, Jarle; Meier, Sonnich; Tenningen, Eirik; Purser, Autun; Thomsen, Laurenz

    2014-07-15

    Environmental awareness and technological advances has spurred development of new monitoring solutions for the petroleum industry. This paper presents experience from a monitoring program off Norway. To maintain operation within the limits of the government regulations Statoil tested a new monitoring concept. Multisensory data were cabled to surface buoys and transmitted to land via wireless communication. The system collected information about distribution of the drilling wastes and the welfare of the corals in relation to threshold values. The project experienced a series of failures, but the backup monitoring provided information to fulfil the requirements of the permit. The experience demonstrated the need for real time monitoring and how such systems enhance understanding of impacts on marine organisms. Also, drilling operations may improve by taking environmental information into account. The paper proposes to standardize and streamline monitoring protocols to maintain comparability during all phases of the operation and between drill sites. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Environmental monitoring report for calendar year 1984

    International Nuclear Information System (INIS)

    Stencel, J.R.

    1985-05-01

    The results of the environmental monitoring program for CY84 for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The Princeton Large Torus (PLT), Princeton Beta Experiment (PBX), and PPPL's largest tokamak, the Tokamak Fusion Test Reactor (TFTR) had a complete year of run time. In addition, the S-1 Spheromak was in operation and the RF Test Facility came on-line. The phased approach of TFTR environmental monitoring continued with the addition of neutron monitors. During CY84 there were no adverse effects to the environment resulting from any operational program at PPPL, and the Laboratory was in compliance with all applicable Federal, State, and local environmental regulations

  19. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sharon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  20. Multi-detector environmental radiation monitor with multichannel data communication for Indian Environmental Radiation Monitoring Network (IERMON)

    International Nuclear Information System (INIS)

    Patel, M.D.; Ratheesh, M.P.; Prakasha, M.S.; Salunkhe, S.S.; Vinod Kumar, A.; Puranik, V.D.; Nair, C.K.G.

    2011-01-01

    A solar powered system for online monitoring of environmental radiation with multiple detectors has been designed, developed and produced. Multiple GM tube detectors have been used to extend the range of measurement from 50 nano Gy/hr to 20 Gy/hr and to enhance the reliability of the system. Online data communication using GSM based and direct LAN based communication has been incorporated. Options for use of power supply from mains powered and battery powered have been enabled. Care has been taken to make it weather-proof, compact, elegant and reliable. The development is a part of the ongoing program of country-wide deployment of radiation monitors under 'Indian Environmental Radiation MOnitoring Network' (IERMON). (author)

  1. Use of the environmental resource management and analysis system at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Erjavec, J.L.

    1992-01-01

    In the past, hazardous waste site characterization and remediation using computer-based technologies has been a difficult and time-consuming process because of the need to analyze data using non-interfaced computer and software environments. The Environmental Resource Management and Analysis System (ERMA) was developed as an innovative approach to the management, analyses and depiction of data collected during a hazardous site remediation. A modular, multi-disciplined software package, ERMA integrates an environmental database management system with variety of Geographic Information System technologies. ERMA capabilities include spatial analysis, three-dimensional subsurface geologic interpretation and modeling, terrain modeling, and groundwater flow and contaminant transport modeling. ERMA's data management is provided through a set of user-modifiable, graphic interface tools that permit complex data queries, data modification and reporting. An ERMA prototype has been implemented at the Fernald Environmental Management Project (a Department of Energy cleanup site) using groundwater monitoring and elevation data collected over the last few years. ERMA has enabled the precision posting of data from the 853 groundwater monitoring wells at the site. Data from these wells have ben used to define the piezometric surface of the Great Miami Aquifer and correlate it with the uranium concentration contours of an identified groundwater plume. Using spatial query capabilities, radioactive sampling results from monitoring wells have been compared to contour maps defining the extent of the plume to determine the validity of those maps and the need for additional well locations

  2. 75 FR 8036 - Monitor-Hot Creek Rangeland Project

    Science.gov (United States)

    2010-02-23

    ... DEPARTMENT OF AGRICULTURE Forest Service Monitor-Hot Creek Rangeland Project AGENCY: Forest... Rangeland Project area. The analysis will determine if a change in management direction for livestock grazing is needed to move existing resource conditions within the Monitor-Hot Creek Rangeland Project area...

  3. Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas

    International Nuclear Information System (INIS)

    1990-01-01

    This report describes the Offsite Radiation Safety Program conducted during 1990 by the Environmental Protection Agency's (EPA's) Environmental Monitoring Systems Laboratory -- Las Vegas. This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ion chambers (PICs); and by biological monitoring of animals, food crops, and humans. Personnel with mobile monitoring equipment are placed in areas downwind from the test site prior to each nuclear weapons test to implement protective actions, provide immediate radiation monitoring, and obtain environmental samples rapidly after any occurrence of radioactivity release

  4. A New Environmental Monitoring System For Silkworm Incubators

    OpenAIRE

    Alejandra Duque-Torres; Juan Ruiz-Rosero; Gesille Zambrano-Gonzalez; Martha Almanza-Pinzon; Oscar Mauricio Caicedo Rendon; Gustavo Ramirez-Gonzalez

    2018-01-01

    A newly Monitoring Environmental Conditions System is proposed based on Raspberry-Pi. This proposal monitors the temperature, humidity, and luminosity in a silkworm incubator. The monitoring data are collected and save in the cloud for the subsequent analysis. The monitoring environmental system is based on Raspberry Pi due to capabilities, features, and low cost. The preliminary tests were realized in a real scenery and the results demonstrating its reliability.

  5. Developing and implementing a monitoring programme: recommendations provided by the MODERN project

    International Nuclear Information System (INIS)

    Mayer, S.; Bergmans, A.; Garcia-Sineriz, J.L.; Breen, B.; Jobmann, M.

    2012-01-01

    Document available in extended abstract form only. The successful implementation of a repository programme relies on both the technical aspects of a sound safety strategy, and scientific and engineering excellence, as well as on social aspects such as public acceptance. Monitoring has the potential to contribute to both of these aspects and thus to play an important role as national radioactive waste disposal programmes move forward towards safe and accepted implementation of geological disposal. The main goal of the 'Monitoring Developments for Safe Repository Operation and staged Closure' (MoDeRn) Project is to take the state-of-the-art of broadly accepted, main monitoring objectives and to develop these to a level of description that is closer to the actual implementation of monitoring during the staged approach of the disposal process. It should be noted that the MoDeRn project recognizes the diversity of monitoring activities that will be required in a repository, in particular related to operational safety, nuclear safeguards and environmental impact assessment. The projects emphasis, however, is on monitoring conducted to verify expected repository system evolutions - i.e. evolutions of the natural environment and the engineered system - during a phase of progressive construction, operation and closure that may last on the order of a century. This serves the purpose of confirming and possibly enhancing the prior license basis for safety and pre-closure management options. Achieving this goal includes analysis of whether the implementation of a realistic monitoring programme is likely to address expert and lay stakeholder expectations (objectives), to provide an understanding of monitoring activities and available technologies that can be implemented in a repository context (feasibility), and to provide recommendations for related, future stakeholder engagement activities (social acceptance). These are carried out by the 18 project partners representing 12

  6. Full spectrum analysis in environmental monitoring

    International Nuclear Information System (INIS)

    Reinhardt, Sascha; Hartmann, Soeren; Pimpl, Richard

    2015-01-01

    In the environmental monitoring spectroscopic gamma detectors are frequently used. The motivation to use spectroscopic gamma detectors is the higher sensitivity and specific spectral information. For the analysis often the photo peaks of the gamma spectrum are used to identify the nuclide. These methods are very reliable, robust and well developed but using only the photo peak means also to use only a fraction of the available information. Doing a full spectrum analysis based on principle components obtained from NASVD for description of the radiation background and adjustment calculations are a possible analysis method which may provide advantages compared to a peak based analysis when used for a continuous environmental monitoring. An analysis example is shown and discussed with a measured time series of gamma spectra obtained from a spectroscopic gamma detector SARA IGS710 with a NaI(Tl) scintillator as it is used in the environmental monitoring.

  7. Full spectrum analysis in environmental monitoring

    International Nuclear Information System (INIS)

    Reinahrdt, S.; Hartmann, S.; Pimpl, R.

    2014-01-01

    In the environmental monitoring spectroscopic gamma detectors are frequently used. The motivation to use spectroscopic gamma detectors is the higher sensitivity and specific spectral information. For the analysis often the photo peaks of the gamma spectrum are used to identify the nuclide. These methods are very reliable, robust and well developed but using only the photo peak means also to use only a fraction of the available information. Doing a full spectrum analysis based on principal components obtained from NASVD for description of the radiation background and adjustment calculations are a possible analysis method, which may provide advantages compared to a peak based analysis when used for a continuous environmental monitoring. An analysis example is shown and discussed with a measured time series of gamma spectra obtained from a spectroscopic gamma detector SARA IGS710 with a NaI(Tl) scintillator as it is used in the environmental monitoring. (authors)

  8. Environmental radiation monitoring from the decommission of TRIGA

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Geun Sik; Lee, Chang Woo

    2000-03-01

    Environmental radiation monitoring was carried out with measurement of environmental radiation and environmental radioactivity analysis around TRIGA Research Reactor. The results of environmental radiation monitoring around TRIGA Research Reactor are the follows: The average level of environmental radiation measured by potable ERM and accumulated radiation dose by TLD was almost same level compared with thepast years. Gross {beta} radioactivity in environmental samples showed a environmental level. {gamma}-radionuclides in water samples were not detected. but only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. (author)

  9. The international remote monitoring project and implication

    International Nuclear Information System (INIS)

    Sonnier, C.S.; Johnson, C.S.

    1994-01-01

    The future of remote monitoring in International Safeguards system is analyzed. Problems of an update on the International Remote Monitoring Project are considered. The Project allows to remotely transmit safeguards-relevant data directly to IAEA from nuclear facilities worldwide. Description of integrated monitoring system (IMS) is given. A key element of state-of-art of IMS is modular nodal system which accepts information from sensors and provides information to both a data storage unit and a transmitter. Remote Monitoring Systems of Australia and Sweden are presented. 3 figs

  10. Advanced Environmental Monitoring Technologies

    Science.gov (United States)

    Jan, Darrell

    2004-01-01

    Viewgraphs on Advanced Environmental Monitoring Technologies are presented. The topics include: 1) Monitoring & Controlling the Environment; 2) Illustrative Example: Canary 3) Ground-based Commercial Technology; 4) High Capability & Low Mass/Power + Autonomy = Key to Future SpaceFlight; 5) Current Practice: in Flight; 6) Current Practice: Post Flight; 7) Miniature Mass Spectrometer for Planetary Exploration and Long Duration Human Flight; 8) Hardware and Data Acquisition System; 9) 16S rDNA Phylogenetic Tree; and 10) Preview of Porter.

  11. Innovative characterization, monitoring and sensor technologies for environmental radioactivity at USDOE sites

    International Nuclear Information System (INIS)

    Hutter, A.; Weeks, S.

    2001-01-01

    The mission of the U.S. Department of Energy Office of Environmental Management (EM) is to clean up its contaminated sites from the past production of nuclear weapons. Within EM, the Office of Science and Technology (OST) is responsible for providing a full range of science and technology resources needed to support resolution of EM cleanup and long-term environmental stewardship problems. This responsibility includes implementation of a technology development pathway from basic research to development, demonstration, and deployment of scientific and technological solutions needed by DOE sites. One OST Program is the Characterization, Monitoring, and Sensor Technology Crosscutting Program (CMST-CP), which aims to provide innovative technologies (i.e., faster, better, cheaper, and/or safer) for environmental characterization and monitoring. Several technologies are described that CMST-CP has supported for development with significant benefits realized or projected over the baseline characterization and monitoring practices. Examples of these technologies include mapping of subsurface radioactivity using Cone Penetrometer and drilling techniques; a Rapid Liquid Sampler for Sr, Ra, Tc, and Cs using 3M Empore TM Rad Disks; Long-Range Alpha Detectors; a Compact High Resolution Spectrometer; BetaScint TM for determination of Sr in soil; Laser-Induced Fluorescence Imaging techniques for mapping U on surfaces; the Environmental Measurements While Drilling System; and the Expedited Site Characterization methodology. (author)

  12. The Coordinating Laboratories for monitoring of environmental radioactivity. History, activities, perspectives

    International Nuclear Information System (INIS)

    Wiechen, A.; Bayer, A.

    2000-10-01

    The article reviews the development of the monitoring of environmental radioactivity in the former Federal Republic of Germany and from 1990 onwards in re-unified Germany. This monitoring originated in the need to investigate the radioactive fallout from the testing of atomic bombs in the atmosphere in the 1950's and 1960's. Monitoring was intensified and became increasingly regulated by law as a response to the large scale use of atomic power and in accordance with the Euratom Treaty of 1957. The necessity of evaluating the radiological effects in old mining regions in some of the new Laender was recognised in 1990. Since then legislation and official monitoring have been extended to include this source of radiation exposure. Also described is the way in which those institutions now termed Coordinating Laboratories were involved in all of the developments mentioned above. They tested and developed sampling, analysis and measurement techniques, carried out research projects on the various contamination pathways, reported regularly on environmental radioactivity and radiation exposure, organised and evaluated interlaboratory comparisons, assisted in the setting up of the Federal Integrated Measurement and Information System (IMIS), and advised the appropriate Federal and Laender Ministries. Some of the Coordinating Laboratories also manage Federal Monitoring Networks. The Precautionary Radiation Protection Act stipulates these tasks and names the institutions appointed as Coordinating Laboratories. (orig.) [de

  13. Epilogue. Environmental aspects of the design and construction of the Gabcikovo hydroelectric power project and environmental impact review based on the three-year monitoring and on the joint Slovak-Hungarian monitoring

    International Nuclear Information System (INIS)

    Lejon, E.

    1996-01-01

    In this chapter of the book author deals with the Gabcikovo-Nagymaros Project (GNP). The Gabcikovo part of the hydroelectric power project was based on a combination of flood control, navigational improvements and the production of electric energy. The Gabcikovo Project has not only saved the inundation area with the flood plain ecotopes, but also includes a wide variety of tools for surface and ground water management, and thus also for the management, or optimalization, of the development of agricultural conditions, inundation biotopes, forestry, river branches biotopes, flood management and the flooding of parts of the inundation area, sedimentation and erosion processes, ground and surface water quality, and other environmental effects management. The GNP, as conceived in the 1977 International Czechoslovak-Hungarian Treaty, is located roughly between 1,860 rkm (river kilometer), at Bratislava, and 1,696 rkm, at Nagymaros. The Hungarians unilaterally decided to abandon the construction of Nagyamaros, and to suspend the work to be carried out on the GNP. After the decision, in order to minimize the spread of economic and ecologic damages to ensure flood protection at least on the Hungarian Szikekoez, to exploit the available power potential, and to create conditions necessary for navigation on the Danube, the Government of the Czech and Slovak Federal Republic decided in December 1991, to put nearly ready Gabcikovo part of the system into operation, constructing the necessary technical structures on their own territory and inside of the construction area of the original Project. These technical structures are known as 'Variant C'. 'Variant C' is situated inside the area of the original project, replaces the function of the Dunakiliti weir in Hungary and uses all of the completed structures of the Gabcikovo part of the Project. The geology, Danube, ground water, pre-dam long-term development, changes after putting the Gabcikovo structures into operation, as well

  14. The Hanford Environmental Dose Reconstruction (HEDR) Project: Technical approach

    International Nuclear Information System (INIS)

    Napier, B.A.; Freshley, M.D.; Gilbert, R.O.; Haerer, H.A.; Morgan, L.G.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    Historical measurements and current assessment techniques are being combined to estimate potential radiation doses to people from radioactive releases to the air, the Columbia River, soils, and ground water at the Hanford Site since 1944. Environmental contamination from these releases has been monitored, at varying levels of detail, for 45 yr. Phase I of the Hanford Environmental Reconstruction Project will estimate the magnitude of potential doses, their areal extends, and their associated uncertainties. The Phase I study area comprises 10 counties in eastern Washington and northern Oregon, within a 100-mi radius of the site, including a stretch of the Columbia River that was most significantly affected. These counties contain a range of projected and measured contaminant levels, environmental exposure pathways, and population groups. Phase I dose estimates are being developed for the periods 1944 through 1947 for air pathways and 1964 through 1966 for river pathways. Important radionuclide/pathway combinations include fission products, such as 131 I, in milk for early atmospheric releases and activation products, such as 32 P and 65 Zn, in fish for releases to the river. Potential doses range over several orders of magnitude within the study area. We will expand the time periods and study are in three successive phases, as warranted by results of Phase I

  15. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  16. Project monitoring package (PMP) : A package for project activity monitoring

    International Nuclear Information System (INIS)

    Vyas, K.N.; Kannan, A.; Susandhi, R.; Basu, S.

    1987-01-01

    A package for preparing PERT/CPM network diagrams has been written for PDP-11/34. The program uses PLOT-10 library calls for device interfacing. The package is essentially non-interactive in nature, and reads input data in the form of activity description and duration. It calculates the critical path time and performs time scaling of the events. The report gives a brief outline of the logic used, a sample plot and tabular output for reference. An additional facility for performing project activity monitoring has also been implemented. Activity monitoring generally requires various reports such as feed back reports from various group co-ordinators, information report for project co-ordinator and brief periodical reports for management. A package 'DATATRIEVE' (DTR) on PDP-11/34 system is utilized for generating the above mentioned reports. As DTR can also use normal sequential files, an interfacing program has been written which reformats the files accepted by PERT program acceptable to DTR. Various types of reports as generated by DTR are included. However this part of the package is not transportable and can be implemented only on systems having DTR. 6 figures. (author)

  17. Unocal Parachute Creek Shale Oil Program Environmental Monitoring Program. Annual report, October 1, 1990-December 31, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The report contains summaries of compliance and supplemental environmental and industrial hygiene and health surveillance monitoring conducted during the period; compliance permits, permit changes, and Notices of Violations discussions; statistical significance of Employee General Health information, medical histories, physical exams, pulmonary functions, clinical tests and demographics; independent audit reports; and a description of retorted shale disposal activities

  18. Fernald Environmental Management Project 1995 site environmental report

    International Nuclear Information System (INIS)

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site's ongoing Environmental Monitoring Program. Also included in this report is information concerning the site's progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA

  19. Off-site environmental monitoring report: Radiation monitoring around United States Nuclear Test areas, Calendar year 1986

    International Nuclear Information System (INIS)

    Patzer, R.G.; Fontana, C.A.; Grossman, R.F.; Black, S.C.; Dye, R.E.; Smith, D.D.; Thome', D.J.; Mullen, A.A.

    1987-05-01

    The principal activity at the NTS is testing of nuclear devices, though other related projects are also conducted. The principal activities of the Off-Site Radiological Safety Program are routine environmental monitoring for radioactive materials in various media and for radiation in areas which may be affected by nuclear tests; and protective actions in support of the nuclear testing program. These are conducted to document compliance with standards, to identify trends, and to provide information to the public. 28 refs., 37 figs., 30 tabs

  20. BIOSENSORS FOR ENVIRONMENTAL MONITORING: A REGULATORY PERSPECTIVE

    Science.gov (United States)

    Biosensors show the potential to complement laboratory-based analytical methods for environmental applications. Although biosensors for potential environmental-monitoring applications have been reported for a wide range of environmental pollutants, from a regulatory perspective, ...

  1. Suggestions for the Improvement of Environmental Radiation Monitoring in Kenya

    International Nuclear Information System (INIS)

    Shadrack, A. K.

    2012-01-01

    Environmental radiation monitoring in Kenya was started in 1990 following the 1979 Three Mile Island and the 1986 Chernobyl nuclear power plants accidents. The main purpose was to measure the radioactivity of foodstuffs imported from oversees and to carry out environmental radiation monitoring of soil, rock, water and air sample to check for contamination. Through environmental radiation monitoring, the Food and Environmental Monitoring Section (FEM) of the Kenya Radiation Protection Board (RPB) works to protect the public and environment from hazards associated with ionizing radiation. The purpose of this paper was to highlight suggestions for the improvement of environmental radiation monitoring in Kenya with respect to protecting the public and the environment against undue radiation risk by ensuring that potential exposures are kept As Low As Reasonably Achievable (ALARA). The suggestions for improvement will serve as a guideline for the strengthening of environmental radiation monitoring program in Kenya

  2. Environmental perverse incentives in coastal monitoring.

    Science.gov (United States)

    Gibbs, Mark T

    2013-08-15

    It can be argued that the intensity of monitoring of coastal marine environments lags behind the equivalent terrestrial environments. This results in a paucity of long-term time series of key environmental parameters such as turbidity. This lack of management information of the sources and sinks, and causes and impacts of stressors to the coastal marine environment, along with a lack of co-ordination of information collection is compromising the ability of environmental impact assessments of major coastal developments to discriminate between local and remote anthropogenic impacts, and natural or background processes. In particular, the quasi outsourcing of the collection of coastal information can lead to a perverse incentive whereby in many cases nobody is actively or consistently monitoring the coastal marine environment effectively. This is particularly the case with regards to the collection of long-term and whole-of-system scale data. This lack of effective monitoring can act to incentivise poor environmental performance. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. Environmental impact assessments of wind energy projects: An Alberta example

    International Nuclear Information System (INIS)

    Brown, W.K.

    1993-01-01

    A description is presented of the environmental impact assessment for an Alberta windfarm, summarizing the rationale, process and results of the assessment, costs involved, and recommendations made. The Pe-kun-nee windfarm was designed as a 44 turbine, 9.9 kW windfarm. The assessment included consideration of the complete range of environmental impacts of the windfarm, including reviews of impacts associated with similar developments elsewhere. From an environmental perspective, the proposed site and transmission line route were exceedingly suitable for development. No major potential impacts were identified. Most impacts that could occur, including terrain and vegetation disturbance, were associated with the construction phase of the project. A series of mitigation measures were developed to minimize each identified impact. Monitoring during the operations phase of the development was recommended to: ensure that the revegetation of disturbed areas was adequate; verify the sound level model; and document the incidence of bird strikes. Potential aesthetic impacts were addressed through a proposed interpretive project designed to educate visitors, enhance the profile of the wind-energy industry, and provide local employment. The assessment was completed within 8 months of initiation at a cost less than $200,000

  4. Fernald Environmental Management Project 1995 site environmental report summary

    International Nuclear Information System (INIS)

    1996-06-01

    This report summarizes the 1995 Site Environmental Report for the Fernald site. It describes the Fernald site mission, exposure pathways, and environmental standards and guidelines. An overview is presented of the impact these activities have on the local environment and public health. Environmental monitoring activities measure and estimate the amount of radioactive and nonradioactive materials that may leave the site and enter the surrounding environment

  5. Monitored retrievable storage submission to Congress: Volume 2, Environmental assessment for a monitored retrievable storage facility

    International Nuclear Information System (INIS)

    1986-02-01

    This Environmental Assessment (EA) supports the DOE proposal to Congress to construct and operate a facility for monitored retrievable storage (MRS) of spent fuel at a site on the Clinch River in the Roane County portion of Oak Ridge, Tennessee. The first part of this document is an assessment of the value of, need for, and feasibility of an MRS facility as an integral component of the waste management system. The second part is an assessment and comparison of the potential environmental impacts projected for each of six site-design combinations. The MRS facility would be centrally located with respect to existing reactors, and would receive and canister spent fuel in preparation for shipment to and disposal in a geologic repository. 207 refs., 57 figs., 132 tabs

  6. Environmental monitoring program of CDTN

    International Nuclear Information System (INIS)

    Ferreira, E.G.

    1985-09-01

    This environmental monitoring program of CDTN aim to do a survey that permit to verify if the radioactive wastes release by CDTN agree with basic rudiments of radioprotection, evaluate the environmental impact, verify the adjustment of using proceedings to effluents control, to evaluate the maximum radiation doses that public persons will be able to get yearly. (C.M.) [pt

  7. Environmental change challenges decision-making during post-market environmental monitoring of transgenic crops.

    Science.gov (United States)

    Sanvido, Olivier; Romeis, Jörg; Bigler, Franz

    2011-12-01

    The ability to decide what kind of environmental changes observed during post-market environmental monitoring of genetically modified (GM) crops represent environmental harm is an essential part of most legal frameworks regulating the commercial release of GM crops into the environment. Among others, such decisions are necessary to initiate remedial measures or to sustain claims of redress linked to environmental liability. Given that consensus on criteria to evaluate 'environmental harm' has not yet been found, there are a number of challenges for risk managers when interpreting GM crop monitoring data for environmental decision-making. In the present paper, we argue that the challenges in decision-making have four main causes. The first three causes relate to scientific data collection and analysis, which have methodological limits. The forth cause concerns scientific data evaluation, which is controversial among the different stakeholders involved in the debate on potential impacts of GM crops on the environment. This results in controversy how the effects of GM crops should be valued and what constitutes environmental harm. This controversy may influence decision-making about triggering corrective actions by regulators. We analyse all four challenges and propose potential strategies for addressing them. We conclude that environmental monitoring has its limits in reducing uncertainties remaining from the environmental risk assessment prior to market approval. We argue that remaining uncertainties related to adverse environmental effects of GM crops would probably be assessed in a more efficient and rigorous way during pre-market risk assessment. Risk managers should acknowledge the limits of environmental monitoring programmes as a tool for decision-making.

  8. Centralized environmental radiation monitoring system in JAERI

    International Nuclear Information System (INIS)

    Katagiri, H.; Kobalyashi, H.

    1993-01-01

    JAERI has continued the environmental radiation background survey and monitoring to ensure the safety of the peoples around the institute since one year before the first criticality of JRR-1 (Japan Research Reactor No.1) in August 1957. Air absorbed doses from β and γ radiation, α and β radioactivity in air and the radioactivities in environmental samples were the monitoring items. For the monitoring of β and γ radiation and α and β radioactivity in air, monitoring station and the centralized automatic environmental radiation monitoring system applying a computer were established as a new challenging monitoring system for nuclear facility, which was the first one not only in Japan but also in the would in 1960 and since then the system has been renewed two times (in 1973 and 1988) by introducing the latest technology in the fields of radiation detection and computer control at each stage. Present system renewed in 1988 was designed to prevent the interruption of monitoring due to computer troubles, communication troubles and power failures especially an instant voltage drop arisen from thunder by reflecting the experiences through the operation and maintenance of the former system. Dual telemeters whose power is constantly supplied via batteries (capable of 10 min monitoring after power failure) are equipped in the monitoring center to cope with telemeter troubles, which has operated successfully without any suspension being attributable to the power failures and telemeter troubles

  9. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  10. Application of radiophotoluminescence dosemeters for environmental monitoring

    International Nuclear Information System (INIS)

    Mihara, A.; Tamura, T.; Mochizuki, T.; Numakunai, T.; Yoshida, Y.; Ohi, Y.

    1993-01-01

    Feasibility study has been made on the radiofluorescence glass (RPL) dosemeters for environmental radiation monitoring. Main items in the laboratory tests are batch uniformities of pre-dose and sensitivity, build-up characteristics of RPL intensity, energy and angular responses, stabilities for RPL reading, anneal cycling and climatic conditional changes. We have determined self-irradiation dose and cosmic ray contribution. Radiation monitoring field test for the RPL dosemeters has been conducted in comparison with the present TLD systems. A procedure manual for the environmental monitoring by the use of RPL dosemeters is in preparation

  11. Environmental monitoring considerations for low-level waste disposal sites

    International Nuclear Information System (INIS)

    Sedlet, J.

    1982-01-01

    All waste disposal sites are required to monitor the environment. The proposed NRC licensing rule, 10 CFR Part 61, requires that such monitoring be conducted before, during, and after a site is operated. An adequate monitoring program consists of measuring concentrations of radionuclides, chemically-toxic substances, and leachate indicators in environmental media and of evaluating specific physical properties of the site. In addition, the composition of the buried waste must be known. Methods for obtaining this information are discussed and monitoring programs are presented for the preoperational, operational, and postclosure phases of a disposal site. Environmental monitoring is considered in a broad context, since it includes monitoring burial trenches onsite, as well as surveillance in the offsite environment. Postclosure monitoring programs will be strongly influenced by the operational monitoring results. In some respects, this phase will be easier since the migration pathways should be well known and the number of radionuclides of concern reduced by radioactive decay. The results of the environmental monitoring program will be vital to successful site operation. These results should be used to determine if operational changes are needed and to predict future environmental impacts

  12. Space Station Environmental Health System water quality monitoring

    Science.gov (United States)

    Vincze, Johanna E.; Sauer, Richard L.

    1990-01-01

    One of the unique aspects of the Space Station is that it will be a totally encapsulated environment and the air and water supplies will be reclaimed for reuse. The Environmental Health System, a subsystem of CHeCS (Crew Health Care System), must monitor the air and water on board the Space Station Freedom to verify that the quality is adequate for crew safety. Specifically, the Water Quality Subsystem will analyze the potable and hygiene water supplies regularly for organic, inorganic, particulate, and microbial contamination. The equipment selected to perform these analyses will be commercially available instruments which will be converted for use on board the Space Station Freedom. Therefore, the commercial hardware will be analyzed to identify the gravity dependent functions and modified to eliminate them. The selection, analysis, and conversion of the off-the-shelf equipment for monitoring the Space Station reclaimed water creates a challenging project for the Water Quality engineers and scientists.

  13. Fernald Environmental Management Project 1995 site environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  14. Environmental monitoring for tritium in tritium separation facility

    International Nuclear Information System (INIS)

    Varlam, Carmen; Stefanescu, Ioan; Steflea, Dumitru; Lazar, Roxana Elena

    2001-01-01

    The Cryogenic Pilot is an experimental project in the nuclear energy national research program, which has the aim of developing technologies for tritium and deuterium separation by cryogenic distillation. The experimental installation is located 15 km near the highest city of the area and 1 km near Olt River. An important chemical activity is developed in the area and chemical plants make up almost entire neighborhood of the Experimental Cryogenic Pilot. It is necessary to emphasize this aspect because the hall sewage system of the pilot is connected with the one of other three chemical plants from vicinity. This is the reason why we progressively established elements of an environmental monitoring program well in advance of tritium operation in order to determine baseline levels. The first step was the tritium level monitoring in environmental water and sewage from neighboring industrial activity. In this work, a low background liquid scintillation was used to determine tritium activity concentration according to ISO 9698/1998 standard. We measured drinking water, precipitation, river water, underground water and wastewater. The tritium level was between 10 TU and 27 TU what indicates that there is no source of tritium contamination in the neighborhood of Cryogenic Pilot. In order to determine baseline levels we decided to monitor monthly each location. In this paper it is presented a standard method used for tritium determination in water samples, the precautions needed to achieve reliable results and the evolution of tritium level in different location near the Experimental Pilot for Tritium and Deuterium Cryogenic Separation. (authors)

  15. Unocal Parachute Creek Shale Oil Program. Environmental Monitoring Plan quarterly report. Fourth quarter, 1989. Rept. for 1 Oct-31 Dec 89

    International Nuclear Information System (INIS)

    1990-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commerical-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The report contains environmental compliance data reports, results of industrial hygiene compliance monitoring, and independent audits. Table 2-1 shows 14 of the 20 supplemental monitoring sites sampled during the quarter

  16. Radiological assessments, environmental monitoring, and study design

    International Nuclear Information System (INIS)

    Hansen, W.R.; Elle, D.R.

    1980-01-01

    Studies of the behavior of transuranic elements in the environment form the basic data for applied programs in radiological assessment, environmental monitoring, derivation of radiation-protection standards, and environmental impact statements. This chapter introduces some of the major information requirements of these applications of transuranic research data. Characteristics of the source terms from nuclear activities usually are needed for an analysis of environmental pathways or deployment of monitoring systems. Major inhalation and ingestion pathways are considered in assessments of hazards from transuranics and are discussed from the viewpoint of research needed

  17. Electromagnetic fields and health impact: measurements, monitoring and environmental indicators

    International Nuclear Information System (INIS)

    Lubritto, C.; Vetromile, C.; Petraglia, A.; Racioppoli, M.; D'Onofrio, A.

    2008-01-01

    Full text: During the last 10 years there has been a remarkable growth of the attention for problems related to the electromagnetic pollution, motivated by the alert connected to potential risk for the health of persons and due to the increasing diffusion of Bats for mobile telecommunication as EMF sources. Many projects are being realized about the environmental and health impact of electromagnetic field and an important social role is played by specific actions to minimize the risk perception of the population. This study aims to find an innovative approach to these problems through the use of a system of continuous time monitoring of the electromagnetic fields and the individuation of appropriate environmental indicators. The proposed system monitors the electromagnetic fields continuously over time, and is already operating in many southern Italian cities. It works in a very efficient way as a mean for: a) Info to the citizens, thanks to diffusion of daily collected data on Internet Web; b) Control for local administrations and Authorities, due to capability of the system itself to alert when measured values exceed the limits reported by the Italian laws; c) Planning, for the implementation of : 1) New procedures agreed among local environmental control agency, local administrations and mobile Companies for network planning and management of alarm situations; 2) New local guidelines documents concerning the installation and operation of telecommunications apparatus. Moreover, starting from the general principles of the Strategic Environmental Evaluation (VAS), the environmental impacts of EMS field is studied. Based on the model DPSIR (Drivers, Pressure, State, Impacts, Responses), 12 environmental indicators have been chosen providing an immediate and understandable tool to obtain very important information on electromagnetic pollution generated by radio-telecommunication systems. The selected environmental indicators have been applied to 11 cities of the

  18. An integrated approach to the Environmental Monitoring Plan of the Pertuso spring (Upper Valley of Aniene River

    Directory of Open Access Journals (Sweden)

    Giuseppe Sappa

    2014-06-01

    Full Text Available Quantitative assessment of groundwater and surface water is an important tool for sustainable management and protection of these important resources. This paper deals with the design of a multi-disciplinary monitoring plan related to the catchment project of the Pertuso spring, in the Upper Valley of Aniene River, which is going to be exploited to supply an important water network in the South part of Roma district. According to the Legislative Decree 152/2006, as modified by DM 260/2010, any infrastructure design should take in consideration an Environmental Monitoring Plan for the hydrogeological settings of the study area. Thus, the hydrogeological characterization combined with an Environmental Monitoring Plan provides to evaluate the potential adverse environmental impacts due catchment works. For water resources assessment and management, the quantification of groundwater recharge is a preliminary step. As a matter of fact, it has been included the quantitative characterization of the Pertuso spring, in the aim of to protect catchment area, which is directly affect by the natural hydrogeological balance of this aquifer. Thus, a multi-disciplinary monitoring plan has been set up, including quantitative and hydrogeochemical measurements, both for groundwater and surface water of the Upper Valley of Aniene River. The target of this Environmental Monitoring Plan is to set up the background framework on the hydromorphological, physico-chemical and biological properties of water resources in the water basin influenced aim by any potential environmental impact due to the construction activities. The Environmental Monitoring Plan and main features of the monitoring network will be presented in this study.

  19. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  20. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  1. Parachute Creek Shale Oil Program Environmental Monitoring Program. Quarterly report, fourth quarter, October 1-December 31, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The document contains environmental compliance data collected in the fourth quarter of 1991, contents of reports on compliance data submitted to regulatory agencies, and supplemental analytical results from retorted shale pile runoff water collected following a storm event during the third quarter of 1991

  2. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Environmental Monitoring Plan applies to the US Department of Energy's (DOE's) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this Environmental Monitoring Plan brings together in one document a description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA). The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards

  3. Monitored Retrievable Storage (MRS) facility project status

    International Nuclear Information System (INIS)

    Milner, R.A.; Trebules, V.W.; Blandford, J.B.

    1994-01-01

    1993 has been yet another year of major change in the Monitored Retrievable Storage (MRS) project. The change in administration has brought a new Secretary of Energy to the Department. Secretary O'Leary has brought a strong leadership background and fresh ideas to address the Department's many complex challenges, including the Civilian Radioactive Waste Management System (CRWMS). Dr. Daniel Dreyfus was named Director of the Office of Civilian Radioactive Waste Management. Mr. Richard Stallings has been named, as the new, Nuclear Waste Negotiator under the Nuclear Waste Policy Act, Amendments of 1987. The overall mission of the Office of Civilian Radioactive Waste Management (OCRWM) has not changed. OCRWM is tasked with finding technically sound, environmentally responsible and economically viable solutions to spent nuclear fuel and high-level radioactive waste storage and disposal

  4. Environmental radiation monitoring around the nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chang Woo; Choi, Geun Sik and others

    2001-02-01

    Environmental Radiation Monitoring was carried out with measurement of environment. Radiation and environmental radioactivity analysis around KAERI nuclear facilities and Seoul Research Reactor. The results of environmental radiation monitoring around KAERI nuclear facilities and Seoul Research Reactor are the follows : The average level of environmental radiation dose measured by NaI scintillation counter and accumulated radiation dose by TLD was almost same level compared with the past years. Gross {alpha}, {beta} radioactivity in environmental samples showed a environmental level. {gamma}-radionuclides in water samples were not detected. But only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. The average level of environmental radiation dose around Seoul Research Reactor was almost same level compared with the past years, and Be-7 and Cs-137 were detected in some surface soil and discharge sediment by {gamma}-spectrometry.

  5. Environmental radiation monitoring around the nuclear facilities

    International Nuclear Information System (INIS)

    Lee, Chang Woo; Choi, Young Ho

    2000-02-01

    Environmental radiation monitoring was carried out with measurement of environment radiation and environmental radioactivity analysis around KAERI nuclear facilities and Seoul Research Reactor. The results of environmental radiation monitoring around KAERI nuclear facilities and Seoul Research Reactor are the follows: The average level of environmental radiation dose measured by NaI scintillation counter and accumulated radiation dose by TLD was almost some level compared with the past years. Gross α, β radioactivity in environmental samples showed a environmental level. γ-radionuclides in water sample were not detected. But only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. The average level of environmental radiation dose around Seoul Research Reactor was almost same level compared with the past years, and Be-7 and Cs-137 were detected in some surface soil and discharge sediment by γ-spectrometry. (author)

  6. Environmental radiation monitoring around the nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chang Woo; Choi, Young Ho

    2000-02-01

    Environmental radiation monitoring was carried out with measurement of environment radiation and environmental radioactivity analysis around KAERI nuclear facilities and Seoul Research Reactor. The results of environmental radiation monitoring around KAERI nuclear facilities and Seoul Research Reactor are the follows: The average level of environmental radiation dose measured by NaI scintillation counter and accumulated radiation dose by TLD was almost some level compared with the past years. Gross {alpha}, {beta} radioactivity in environmental samples showed a environmental level. {gamma}-radionuclides in water sample were not detected. But only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. The average level of environmental radiation dose around Seoul Research Reactor was almost same level compared with the past years, and Be-7 and Cs-137 were detected in some surface soil and discharge sediment by {gamma}-spectrometry. (author)

  7. Environmental radiation monitoring around the nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chang Woo; Choi, Young Ho; Lee, M.H. [and others

    1999-02-01

    Environmental radiation monitoring was carried out with measurement of environment radiation and environmental radioactivity analysis around KAERI nuclear facilities and Seoul research reactor. The results of environmental radiation monitoring around KAERI nuclear facilities and Seoul research reactor are the follows : The average level of environmental radiation dose measured by NaI scintillation counter and accumulated radiation dose by TLD was almost same level compared with the past years. Gross {alpha}, {beta} radioactivity in environmental samples showed a environmental level. {gamma}-radionuclides in water samples were not detected. But only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. The average level of environmental radiation dose around Seoul research reactor was almost same level compared with the past years, and Be-7 and Cs-137 were detected in some surface soil and discharge sediment by {gamma}-spectrometry. (author). 3 refs., 50 tabs., 12 figs.

  8. Environmental radiation monitoring around the nuclear facilities

    International Nuclear Information System (INIS)

    Lee, Chang Woo; Choi, Geun Sik and others

    2001-02-01

    Environmental Radiation Monitoring was carried out with measurement of environment. Radiation and environmental radioactivity analysis around KAERI nuclear facilities and Seoul Research Reactor. The results of environmental radiation monitoring around KAERI nuclear facilities and Seoul Research Reactor are the follows : The average level of environmental radiation dose measured by NaI scintillation counter and accumulated radiation dose by TLD was almost same level compared with the past years. Gross α, β radioactivity in environmental samples showed a environmental level. γ-radionuclides in water samples were not detected. But only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. The average level of environmental radiation dose around Seoul Research Reactor was almost same level compared with the past years, and Be-7 and Cs-137 were detected in some surface soil and discharge sediment by γ-spectrometry

  9. Environmental radiation monitoring around the research reactors

    International Nuclear Information System (INIS)

    Lee, Chang Woo; Lee, Hyun Duk; Kim, Sam Rang; Choi, Yong Ho; Kim, Jeong Moo; Lee, Myeon Joo; Lee, Myeong Ho; Hong, Kwang Hee; Lim, Moon Ho; Lee, Won Yoon; Park, Do Won; Choi, Sang Do

    1993-04-01

    Environmental radiation monitoring was carried out measurement of environmental radiation and environmental radioactivity analysis around KAERI nuclear facilities and Seoul research reactor. The results of environmental radiation monitoring around KAERI nuclear facilities and Seoul research reactor are the follows : The average level of environmental radiation dose measured by NaI scintillation counter and accumulated radiation dose by TLD was almost same level compared with the past years. Gross α, β radioactivity in environmental sample was not found abnormal data. γ-radionuclides in water samples were not detected. But only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. The average level of environmental radiation dose around Seoul research reactor was almost same level compared with the past years, and Be-7 and Cs-137 were detected in some surface soil and discharge sediment by γ-spectrometry. (Author)

  10. Integrated Atmosphere Resource Recovery and Environmental Monitoring Technology Demonstration for Deep Space Exploration

    Science.gov (United States)

    Perry, Jay L.; Abney, Morgan B.; Knox, James C.; Parrish, Keith J.; Roman, Monserrate C.; Jan, Darrell L.

    2012-01-01

    Exploring the frontiers of deep space continues to be defined by the technological challenges presented by safely transporting a crew to and from destinations of scientific interest. Living and working on that frontier requires highly reliable and efficient life support systems that employ robust, proven process technologies. The International Space Station (ISS), including its environmental control and life support (ECLS) system, is the platform from which humanity's deep space exploration missions begin. The ISS ECLS system Atmosphere Revitalization (AR) subsystem and environmental monitoring (EM) technical architecture aboard the ISS is evaluated as the starting basis for a developmental effort being conducted by the National Aeronautics and Space Administration (NASA) via the Advanced Exploration Systems (AES) Atmosphere Resource Recovery and Environmental Monitoring (ARREM) Project.. An evolutionary approach is employed by the ARREM project to address the strengths and weaknesses of the ISS AR subsystem and EM equipment, core technologies, and operational approaches to reduce developmental risk, improve functional reliability, and lower lifecycle costs of an ISS-derived subsystem architecture suitable for use for crewed deep space exploration missions. The most promising technical approaches to an ISS-derived subsystem design architecture that incorporates promising core process technology upgrades will be matured through a series of integrated tests and architectural trade studies encompassing expected exploration mission requirements and constraints.

  11. 15. Experts' meeting on monitoring environmental radioactivity. Data - models - information. Proceedings

    International Nuclear Information System (INIS)

    2014-01-01

    The proceedings of the 15. Experts' meeting on monitoring environmental radioactivity include contributions o the following topics: environmental monitoring in Germany; developments in emergency protection and environmental monitoring; implementation of model and information systems; measuring programs during events and exercises; public information during local and global events; fast and (new) analytical methods; measures of the quality management systems; European and international environmental monitoring harmonization.

  12. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  13. Survey monitoring of environmental radioactivity in Gwangju area

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Jeong Ju; Na, Jeong Yeun [Chonnam National Univ., Gwangju (Korea, Republic of)

    2001-12-15

    The objectives of this project are to detect radiation abnormalities In its early stage, to survey the regional environmental radiation/radioactivity levels and me variations of the levels, to prepare the capability of managing the radiological emergencies, and finally to extabish the protective and defence systems against the radiological hazards for the general publics. This report presents the levels of the external gamma dose rates, the gross {beta} - activities in the natural samples, such as airborne dust, fallout, precipitation, and tap water, which were continuously monitored at the environmental research institute at CNU during 2001, and also the levels of the {gamma} - activities in food samples and drinking water which were measured to collect the basic data of the regional environmental radioactivity levels around the Kwangju city and Chonnam province. The levels of the {gamma} - and gross {beta} - activities in the natural samples didn't any significant abnormality during 2001 and were similar to the results obtained in the past 5 years. The {gamma} - activities in almost all food samples, except for a few samples, and drinking water samples were measured to be below the MDA values.

  14. Survey monitoring of environmental radioactivity in Gwangju area

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Jeong Ju; Na, Jeong Yeun [Chonnam National Univ., Gwangju (Korea, Republic of)

    2003-12-15

    The objectives of this project are to detect radiation abnormalities in its early stage, to survey the regional environmental radiation/radioactivity levels and the variations of the levels, to prepare the capability of managing the radiological emergencies, and finally to extabish the protective and defence systems against the radiological hazards for the general publics. This report presents the levels of the external gamma dose rates, the gross {beta} - activities in the natural samples, such as airborne dust, fallout, precipitation, and tap water, which were continuously monitored at the environmental research institute at CNU during 2003, and also the levels of the {gamma} - activities in food samples and drinking water which were measured to collect the basic data of the regional environmental radioactivity levels around the Gwangju city and Chonnam province. The levels of the {gamma} - and gross {beta} - activities in the natural samples didn't any significant abnormality during 2003 and were similar to the results obtained in the past 5 years. The {gamma} - activities in almost all food samples, except for a few samples, and drinking water samples were measured to be below the MDA values.

  15. Survey monitoring of environmental radioactivity in Gwangju area

    International Nuclear Information System (INIS)

    Woo, Jeong Ju; Na, Jeong Yeun

    2001-12-01

    The objectives of this project are to detect radiation abnormalities In its early stage, to survey the regional environmental radiation/radioactivity levels and me variations of the levels, to prepare the capability of managing the radiological emergencies, and finally to extabish the protective and defence systems against the radiological hazards for the general publics. This report presents the levels of the external gamma dose rates, the gross β - activities in the natural samples, such as airborne dust, fallout, precipitation, and tap water, which were continuously monitored at the environmental research institute at CNU during 2001, and also the levels of the γ - activities in food samples and drinking water which were measured to collect the basic data of the regional environmental radioactivity levels around the Kwangju city and Chonnam province. The levels of the γ - and gross β - activities in the natural samples didn't any significant abnormality during 2001 and were similar to the results obtained in the past 5 years. The γ - activities in almost all food samples, except for a few samples, and drinking water samples were measured to be below the MDA values

  16. A Two-Level Sound Classification Platform for Environmental Monitoring

    Directory of Open Access Journals (Sweden)

    Stelios A. Mitilineos

    2018-01-01

    Full Text Available STORM is an ongoing European research project that aims at developing an integrated platform for monitoring, protecting, and managing cultural heritage sites through technical and organizational innovation. Part of the scheduled preventive actions for the protection of cultural heritage is the development of wireless acoustic sensor networks (WASNs that will be used for assessing the impact of human-generated activities as well as for monitoring potentially hazardous environmental phenomena. Collected sound samples will be forwarded to a central server where they will be automatically classified in a hierarchical manner; anthropogenic and environmental activity will be monitored, and stakeholders will be alarmed in the case of potential malevolent behavior or natural phenomena like excess rainfall, fire, gale, high tides, and waves. Herein, we present an integrated platform that includes sound sample denoising using wavelets, feature extraction from sound samples, Gaussian mixture modeling of these features, and a powerful two-layer neural network for automatic classification. We contribute to previous work by extending the proposed classification platform to perform low-level classification too, i.e., classify sounds to further subclasses that include airplane, car, and pistol sounds for the anthropogenic sound class; bird, dog, and snake sounds for the biophysical sound class; and fire, waterfall, and gale for the geophysical sound class. Classification results exhibit outstanding classification accuracy in both high-level and low-level classification thus demonstrating the feasibility of the proposed approach.

  17. Environmental radiation monitoring system in nuclear power station

    International Nuclear Information System (INIS)

    Matsuoka, Sadazumi; Tadachi, Katsuo; Endo, Mamoru; Yuya, Hiroshi

    1983-01-01

    At the time of the construction of nuclear power stations, prior to their start of operation, the state of environmental radiation must be grasped. After the start of the power stations, based on those data, the system of environmental radiation monitoring is established. Along with the construction of Kashiwazaki-Kariwa Nuclear Power Station, The Tokyo Electric Power Co., Inc. jointly with Fujitsu Ltd. has developed a high-reliability, environmental radiation monitoring system, and adopted ''optical data highways'' using optical fiber cables for communication. It consists of a central monitoring station and 11 telemeter observation points, for collecting both radiation and meteorological data. The data sent to the central station through the highways are then outputted on a monitoring panel. They are analyzed with a central processor, and the results are printed out. (Mori, K.)

  18. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  19. 24 CFR 50.22 - Environmental management and monitoring.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Environmental management and... and Urban Development PROTECTION AND ENHANCEMENT OF ENVIRONMENTAL QUALITY General Policy: Environmental Review Procedures § 50.22 Environmental management and monitoring. An Environmental Management and...

  20. The Community Environmental Monitoring Program in the 21st Century: The Evolution of a Monitoring Network

    International Nuclear Information System (INIS)

    Hartwell, W.T.; Tappen, J.; Karr, L.

    2007-01-01

    This paper focuses on the evolution of the various operational aspects of the Community Environmental Monitoring Program (CEMP) network following the transfer of program administration from the U.S. Environmental Protection Agency (EPA) to the Desert Research Institute (DRI) of the Nevada System of Higher Education in 1999-2000. The CEMP consists of a network of 29 fixed radiation and weather monitoring stations located in Nevada, Utah, and California. Its mission is to involve stakeholders directly in monitoring for airborne radiological releases to the off site environment as a result of past or ongoing activities on the Nevada Test Site (NTS) and to make data as transparent and accessible to the general public as feasible. At its inception in 1981, the CEMP was a cooperative project of the U.S. Department of Energy (DOE), DRI, and EPA. In 1999-2000, technical administration of the CEMP transitioned from EPA to DRI. Concurrent with and subsequent to this transition, station and program operations underwent significant enhancements that furthered the mission of the program. These enhancements included the addition of a full suite of meteorological instrumentation, state-of-the-art electronic data collectors, on-site displays, and communications hardware. A public website was developed. Finally, the DRI developed a mobile monitoring station that can be operated entirely on solar power in conjunction with a deep-cell battery, and includes all meteorological sensors and a pressurized ion chamber for detecting background gamma radiation. Final station configurations have resulted in the creation of a platform that is well suited for use as an in-field multi-environment test-bed for prototype environmental sensors and in interfacing with other scientific and educational programs. Recent and near-future collaborators have included federal, state, and local agencies in both the government and private sectors. The CEMP also serves as a model for other programs wishing to

  1. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    Energy Technology Data Exchange (ETDEWEB)

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  2. 15 CFR 970.702 - Monitoring and mitigation of environmental effects.

    Science.gov (United States)

    2010-01-01

    ... environmental effects. 970.702 Section 970.702 Commerce and Foreign Trade Regulations Relating to Commerce and... REGULATIONS OF THE ENVIRONMENTAL DATA SERVICE DEEP SEABED MINING REGULATIONS FOR EXPLORATION LICENSES Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an...

  3. The community environmental monitoring program: a model for stakeholder involvement in environmental monitoring

    International Nuclear Information System (INIS)

    Hartwell, William T.; Shafer, David S.

    2007-01-01

    Since 1981, the Community Environmental Monitoring Program (CEMP) has involved stakeholders directly in its daily operation and data collection, as well as in dissemination of information on radiological surveillance in communities surrounding the Nevada Test Site (NTS), the primary location where the United States (US) conducted nuclear testing until 1992. The CEMP is funded by the US Department of Energy's National Nuclear Security Administration, and is administered by the Desert Research Institute (DRI) of the Nevada System of Higher Education. The CEMP provides training workshops for stakeholders involved in the program, and educational outreach to address public concerns about health risk and environmental impacts from past and ongoing NTS activities. The network includes 29 monitoring stations located across an approximately 160,000 km 2 area of Nevada, Utah and California in the southwestern US. The principal radiological instruments are pressurized ion chambers for measuring gamma radiation, and particulate air samplers, primarily for alpha/beta detection. Stations also employ a full suite of meteorological instruments, allowing for improved interpretation of the effects of meteorological events on background radiation levels. Station sensors are wired to state-of-the-art data-loggers that are capable of several weeks of on-site data storage, and that work in tandem with a communications system that integrates DSL and wireless internet, land line and cellular phone, and satellite technologies for data transfer. Data are managed through a platform maintained by the Western Regional Climate Center (WRCC) that DRI operates for the U.S. National Oceanic and Atmospheric Administration. The WRCC platform allows for near real-time upload and display of current monitoring information in tabular and graphical formats on a public web site. Archival data for each station are also available on-line, providing the ability to perform trending analyses or calculate site

  4. Environmental radiation monitoring from the decommission of TRIGA

    Energy Technology Data Exchange (ETDEWEB)

    Choi Geun Sik; Lee, Chang Woo [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-02-01

    Environmental Radiation Monitoring was carried out with measurement of environment radiation and environment radioactivity analysis around TRIGA Research Reactor. The results of environmental radiation monitoring around TRIGA Research Reactor are the follows: The average level of environmental radiation dose measured by potable ERM and accumulated radiation dose by TLD was almost same level compared with the past years. Gross {beta} radioactivity in environmental samples showed a environmental level. v-radionuclides in water samples were not detected. But only radionuclide K-40, which is natural radionuclide, was detected in the all samples and Cs-137 was detected in the surface soil and discharge sediment. 37 refs., 12 figs., 31 tabs. (Author)

  5. Integrated environmental monitoring -- prototype demonstration

    International Nuclear Information System (INIS)

    Bryce, R.W.; Vail, L.W.; Hostetler, D.D.; Meyer, P.D.; Carlson, T.J.; Miller, P.L.

    1994-01-01

    Groundwater monitoring is an important activity at US Department of Energy (DOE) sites. Monitoring programs at DOE facilities have evolved in response to operational needs at the facilities, public outcries for information, regulatory requirements, DOE orders, and improvements in monitoring technology. Decisions regarding sampling location, sampling frequency, analyses performed, and other aspects of monitoring network design can have major implications for detecting releases and for making subsequent higher level decisions about facility operation and remediation. The Integrated Environmental Monitoring (IEM) concept is a set of analytical procedures and software tools that can be used to improve monitoring network design decisions. Such decisions include the choice of monitoring locations, sampling frequencies, sensor technologies, and monitored constituents. IEM provides a set of monitoring alternatives that balance the tradeoffs between competing monitoring objectives such as the minimization of cost and the minimization of uncertainty. The alternatives provided are the best available with respect to the monitoring objectives, consistent with the physical and chemical characteristics of the site, and consist with applicable regulatory requirements. The selection of the best monitoring alternative to implement is made by the stakeholders after reviewing the alternatives and tradeoffs produced by the IEM process

  6. Sandia National Laboratories California Environmental Monitoring Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2007-03-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Monitoring Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/CA.

  7. Environmental radiation monitoring system in Tokai and Oarai areas

    International Nuclear Information System (INIS)

    Morita, Shigeki

    1983-01-01

    In the Tokai and the Oarai areas there are total of seventeen enterprises, different in size and kind, connected with nuclear energy. Environmental monitoring is carried out in the cooperation of the Government, local governments and enterprises according to the plans by a prefectural monitoring committee. The purpose is in the following three aspects: (1) Estimation of the dose of general people, based on environmental radioactivity and released radioactivity data (2) Grasping the radioactive accumulation on long-terms (3) Detection of abnormal releases from the enterprises at an early stage. By environmental monitoring made thus far, no rise in environmental radioactivities due to the enterprises is indicated. (author)

  8. Program of environmental radiological monitoring

    International Nuclear Information System (INIS)

    2005-11-01

    This Regulation refers to the requirement of the Regulation CNEN-NN.3.01, 'Basic Act of Radiological Protection', as expressed in the section 5.14, related to the Program of Environmental Radiological Monitoring (PMRA)

  9. Governance through information: environmental monitoring from a citizen-consumer perspective

    NARCIS (Netherlands)

    Burg, van den S.W.K.

    2006-01-01

    The function of environmental monitoring and information in governing the environment has changed considerably in recent times. Traditionally, environmental monitoring was geared towards governments and producers; it provided them with the information required to formulate environmental policies and

  10. Sampling method of environmental radioactivity monitoring

    International Nuclear Information System (INIS)

    1984-01-01

    This manual provides sampling methods of environmental samples of airborne dust, precipitated dust, precipitated water (rain or snow), fresh water, soil, river sediment or lake sediment, discharged water from a nuclear facility, grains, tea, milk, pasture grass, limnetic organisms, daily diet, index organisms, sea water, marine sediment, marine organisms, and that for tritium and radioiodine determination for radiation monitoring from radioactive fallout or radioactivity release by nuclear facilities. This manual aims at the presentation of standard sampling procedures for environmental radioactivity monitoring regardless of monitoring objectives, and shows preservation method of environmental samples acquired at the samplingpoint for radiation counting for those except human body. Sampling techniques adopted in this manual is decided by the criteria that they are suitable for routine monitoring and any special skillfulness is not necessary. Based on the above-mentioned principle, this manual presents outline and aims of sampling, sampling position or object, sampling quantity, apparatus, equipment or vessel for sampling, sampling location, sampling procedures, pretreatment and preparation procedures of a sample for radiation counting, necessary recording items for sampling and sample transportation procedures. Special attention is described in the chapter of tritium and radioiodine because these radionuclides might be lost by the above-mentioned sample preservation method for radiation counting of less volatile radionuclides than tritium or radioiodine. (Takagi, S.)

  11. Radiation survey meters used for environmental monitoring

    International Nuclear Information System (INIS)

    Bjerke, H.; Sigurdsson, T.; Meier Pedersen, K.; Grindborg, J.-E.; Persson, L.; Siiskonen, T.; Hakanen, A.; Kosunen, A.

    2012-01-01

    The Nordic dosimetry group set up the GammaRate project to investigate how its expertise could be used to assure appropriate usage of survey meters in environmental monitoring. Considerable expertise in calibrating radiation instruments exists in the Nordic radiation protection authorities. The Swedish, Finnish, Danish and Norwegian authorities operate Secondary Standard Dosimetry Laboratories (SSDLs) that provide users with calibration traceable to internationally recognised primary standards. These authorities together with the Icelandic authorities have formally cooperated since 2002 in the field of radiation dosimetry. Dosimetry is the base for assesment of risk from ionising radiation and calibration of instruments is an imported part in dosimetry. The Nordic dosimetry group has been focused on cancer therapy. This work extends the cooperation to the dosimetry of radiation protection and environmental monitoring. This report contains the formal, theoretical and practical background for survey meter measurements. Nordic standards dosimetry laboratories have the capability to provide traceable calibration of instruments in various types of radiation. To verify and explore this further in radiation protection applications a set of survey instruments were sent between the five Nordic countries and each of the authority asked to provide a calibration coefficient for all instruments. The measurement results were within the stated uncertainties, except for some results from NRPA for the ionchamber based instrument. The comparison was shown to be a valuable tool to harmonize the calibration of radiation protection instruments in the Nordic countries. Dosimetry plays an important role in the emergency situations, and it is clear that better traceability and harmonised common guidelines will improve the emergency preparedness and health. (Author)

  12. Radiation survey meters used for environmental monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Bjerke, H. (ed.) (Norwegian Radiation Protection Authority, NRPA (Norway)); Sigurdsson, T. (Icelandic Radiation Safety Authority, Geislavarnir Rikisins, GR (IS)); Meier Pedersen, K. (National Board of Health, Statens Institut for Straalebeskyttelse (SIS) (Denmark)); Grindborg, J.-E.; Persson, L. (Swedish Radiation Safety Authority, Straalsaekerhetsmyndigheten (SSM) (Sweden)); Siiskonen, T.; Hakanen, A.; Kosunen, A. (Radiation and Nuclear Safety Authority, Saeteilyturvakeskus (STUK) (Finland))

    2012-01-15

    The Nordic dosimetry group set up the GammaRate project to investigate how its expertise could be used to assure appropriate usage of survey meters in environmental monitoring. Considerable expertise in calibrating radiation instruments exists in the Nordic radiation protection authorities. The Swedish, Finnish, Danish and Norwegian authorities operate Secondary Standard Dosimetry Laboratories (SSDLs) that provide users with calibration traceable to internationally recognised primary standards. These authorities together with the Icelandic authorities have formally cooperated since 2002 in the field of radiation dosimetry. Dosimetry is the base for assesment of risk from ionising radiation and calibration of instruments is an imported part in dosimetry. The Nordic dosimetry group has been focused on cancer therapy. This work extends the cooperation to the dosimetry of radiation protection and environmental monitoring. This report contains the formal, theoretical and practical background for survey meter measurements. Nordic standards dosimetry laboratories have the capability to provide traceable calibration of instruments in various types of radiation. To verify and explore this further in radiation protection applications a set of survey instruments were sent between the five Nordic countries and each of the authority asked to provide a calibration coefficient for all instruments. The measurement results were within the stated uncertainties, except for some results from NRPA for the ionchamber based instrument. The comparison was shown to be a valuable tool to harmonize the calibration of radiation protection instruments in the Nordic countries. Dosimetry plays an important role in the emergency situations, and it is clear that better traceability and harmonised common guidelines will improve the emergency preparedness and health. (Author)

  13. Program of environmental and bio monitoring sampling

    International Nuclear Information System (INIS)

    Fernandez, H.

    2012-01-01

    This presentation is about the importance of the biological signs to determine the environmental features characteristics.The low level of taxonomic resolution and the environmental perturbation is determined by the bio monitoring techniques

  14. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  15. Washington wildlife mitigation projects. Final programmatic environmental assessment and finding of no significant impact

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities

  16. Environmental monitoring of nuclear facilities

    International Nuclear Information System (INIS)

    Winter, M.

    1983-01-01

    The objectives of one environmental monitoring program for nuclear facilities, are presented. The program in Federal Republic of Germany, its goals, its basic conditions, its regulations, and its dose limits are emphasized. (E.G.) [pt

  17. The Vaalputs radiological environmental monitoring programme

    International Nuclear Information System (INIS)

    Van As, D.; Posnik, S.J.; Bain, C.A.R.

    1986-01-01

    An environmental monitoring programme was initiated two years before radioactive waste was due to be disposed of at the Vaalputs site. During this time a database was established against which future changes in the radiation levels of the environment could be measured. The monitoring network included the measurement of radiation doses, radioactivity levels in soil, vegetation, groundwater, and agricultural produce. A natural radiation dose to the average individual of 2,2 mSv per annum was established. Meteorological parameters were collected and used to assess the potential release and transport of radioactivity through the environment. A survey of the habits of the surrounding population was conducted to identify the principal food chains. In addition to complying with the licensing requirements for the waste disposal site, the environmental monitoring programme is contributing valuable scientific information on evapotranspiration and percolation in semi-arid environments

  18. Environmental monitoring and surveillance on the Oak Ridge Reservation: 1993 Data

    International Nuclear Information System (INIS)

    Koncinski, W.S.

    1994-12-01

    Environmental monitoring and surveillance are conducted on the Oak Ridge Reservation and its environs throughout the year. Environmental monitoring ensures that (1) the reservation is a safe place to work, (2) activities on the reservation do not adversely affect the neighboring communities, and (3) compliance is made with federal and state regulations. This document is a compilation of the monitoring and surveillance data for calendar year 1993. It is a tool for analysts in the fields of environmental monitoring and environmental restoration. The summary information found in the annual site environmental report was drawn from the contents of summary in this document

  19. Pinellas Plant environmental monitoring report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    The effluent and environmental monitoring programs maintained by the Pinellas Plant are designed to determine the efficiencies of treatment and control mechanisms for environmental releases; to provide measurements of discharge concentrations for comparison with applicable standards; and to assess the concentrations of these discharges in the on-site and off-site environment

  20. Annual report on global environmental monitoring - 1993

    International Nuclear Information System (INIS)

    1993-01-01

    In recent decades, scientific evidence from long-term monitoring has revealed the creeping destruction of ecosystems upon which human existence depends. Recognition of this destruction is changing the international policies used to manage our planet. Vast quantities of information regarding the status of the global environment is necessary in order to achieve a solid consensus among nations for environmental policies. To detect global change early, systematic monitoring with coverage of the entire surface of the earth should be implemented under close coordination among countries and researchers from different disciplines. The resulting precise and accurate measurements should be integrated in a timely fashion into an internationally coordinated database which will be available to the decision makers. In view of this concept, the Center for Global Environmental Research was established in 1990 and started work on monitoring, data management, modeling and their integration. CGER's field of monitoring covers the stratosphere, troposphere, fresh water, marine and terrestrial ecosystems. Groups of researchers are organized to design and conduct the monitoring. After intensive examination by these researchers, the resulting data are compiled into this report to be used in academic society as well as to serve decision makers. In 1993 two series of monitoring data reached this stage of publishing. This report contains the results of the Ozone Lidar Monitoring Program and the Japan-Korea Marine Biogeochemical Monitoring Program. The Center for Global Environmental Research very much appreciates both the research staff of these programs for their long-term and patient measurements and the advisory members for their valuable recommendations to the staffs. Those researchers who wish to examine and utilize the raw or primary data are strongly encouraged to contact the Monitoring Section of the center

  1. Manual on environmental monitoring in normal operation

    International Nuclear Information System (INIS)

    1966-01-01

    Many establishments handling radioactive materials produce, and to some extent also discharge, radioactive waste as part of their normal operation. The radiation doses to which members of the public may be exposed during such operation must remain below the stipulated level. The purpose of this manual is to provide technical guidance for setting up programmes of routine environmental monitoring in the vicinity of nuclear establishment. The annex gives five examples of routine environmental monitoring programmes currently in use: these have been indexed separately.

  2. Regional Geographic Information Systems of Health and Environmental Monitoring

    Directory of Open Access Journals (Sweden)

    Kurolap Semen A.

    2016-12-01

    Full Text Available The article describes a new scientific and methodological approach to designing geographic information systems of health and environmental monitoring for urban areas. Geographic information systems (GIS are analytical tools of the regional health and environmental monitoring; they are used for an integrated assessment of the environmental status of a large industrial centre or a part of it. The authors analyse the environmental situation in Voronezh, a major industrial city, located in the Central Black Earth Region with a population of more than 1 million people. The proposed research methodology is based on modern approaches to the assessment of health risks caused by adverse environmental conditions. The research work was implemented using a GIS and multicriteria probabilistic and statistical evaluation to identify cause-and-effect links, a combination of action and reaction, in the dichotomy ‘environmental factors — public health’. The analysis of the obtained statistical data confirmed an increase in childhood diseases in some areas of the city. Environmentally induced diseases include congenital malformations, tumors, endocrine and urogenital pathologies. The main factors having an adverse impact on health are emissions of carcinogens into the atmosphere and the negative impact of transport on the environment. The authors identify and characterize environmentally vulnerable parts of the city and developed principles of creating an automated system of health monitoring and control of environmental risks. The article offers a number of measures aimed at the reduction of environmental risks, better protection of public health and a more efficient environmental monitoring.

  3. Methods and advantages of intercomparisons of TLDs for environmental monitoring

    International Nuclear Information System (INIS)

    Ranogajec-Komor, M.; Klemic, G.

    1997-01-01

    One of the most difficult tasks facing the international community is the monitoring of environmental radiation for potential increases due to facility accidents or weapons activity. Monitoring networks have been established to provide a record of natural background radiation as well as measure any radiation releases from a facility. Thermoluminescent dosimeters (TLDs) are an important element of such networks and are the most widely used passive detector for environmental monitoring. In order to reach a high international standard in the application of TLDs in routine environmental monitoring, there is a need for a intercomparisons. (authors)

  4. Environmental monitoring at the Lawrence Livermore National Laboratory. 1982 annual report

    International Nuclear Information System (INIS)

    Griggs, K.S.; Gonzalez, M.A.; Buddemeier, R.W.

    1983-01-01

    Environmental monitoring efforts spanned air, water, vegetation and foodstuffs, and radiation doses. Monitoring data collection, analysis, and evaluation are presented for air, soils, sewage, water, vegetation and foodstuffs, milk, and general environmental radioactivity. Non-radioactive monitoring addresses beryllium, chemical effluents in sewage, noise pollution, and storm runoff and liquid discharge site pollutants. Quality assurance efforts are addressed. Five appendices present tabulated data; environmental activity concentration; dose calculation method; discharge limits to sanitary sewer systems of Livermore; and sampling and analytical procedures for environmental monitoring

  5. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  6. Continuation of superpave projects monitoring.

    Science.gov (United States)

    2011-07-01

    This study involved the continuous monitoring of material properties and field performance of twelve Superpave project sections in Florida for the establishment of reasonable and effective mixture design guidelines and criteria, the identification an...

  7. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  8. Environmental radiation monitoring in Sao Paulo state

    International Nuclear Information System (INIS)

    Agudo, E.G.; Albuquerque, A.M. de; Vasconcellos, N.V. de

    1991-01-01

    The results of environmental radiation monitoring that CETESB (Technological Company of Environmental Sanitation of Sao Paulo) does in influence areas of radioactive materials store of Nuclemon Minero-Quimica S.A. in the municipality of Itu, Sao Paulo State, are presented. The data comprises the period of 1983-1990 with information about concentration levels of radium-225 in underground and superficial waters of the region. On March, 1989, was detected contamination in a well near of the stores. The levels observed, its implications in terms of health risks and possible causes of event are discussed too. The goals that CETESB intends to reach in terms of monitoring of environmental radiation in Sao Paulo State are also presented. (C.M.)

  9. Environmental radiation exposure: Regulation, monitoring, and assessment

    International Nuclear Information System (INIS)

    Chen, S.Y.; Yu, C.; Hong, K.J.

    1991-01-01

    Radioactive releases to the environment from nuclear facilities constitute a public health concern. Protecting the public from such releases can be achieved through the establishment and enforcement of regulatory standards. In the United States, numerous standards have been promulgated to regulate release control at nuclear facilities. Most recent standards are more restrictive than those in the past and require that radioactivity levels be as low as reasonably achievable (ALARA). Environmental monitoring programs and radiological dose assessment are means of ensuring compliance with regulations. Environmental monitoring programs provide empirical information on releases, such as the concentrations of released radioactivity in environmental media, while radiological dose assessment provides the analytical means of quantifying dose exposures for demonstrating compliance

  10. Managing water, fish and power : trends in environmental regulation of hydropower projects

    Energy Technology Data Exchange (ETDEWEB)

    Bursey, D.; McLean, J.; Longe, R. [Bull, Housser and Tupper LLP, Vancouver, BC (Canada)

    2009-07-01

    Recent trends in federal legislation related to the environmental impacts of hydroelectric power projects were reviewed. The study focused on a discussion of recent and proposed amendments to the Species at Risk Act, the Fisheries Act, and the Navigable Waters Protection Act. Challenges associated with risk management, the public perception of risk, and the communication of decisions related to the management and protection of aquatic ecosystems were discussed. The Brilliant Expansion Power Project (BRX) examined the interactions with white sturgeon on the Kootenay River in British Columbia (BC). A monitoring program was conducted during the project's construction in order to reduce the risk to sturgeon from blasting. A habitat enhancement feature was also constructed. It was concluded that the mitigation strategies used during the BRX project provide a useful example of innovation and adaptive management. 19 refs.

  11. Monitored retrievable storage submission to Congress: Volume 2, Environmental assessment for a monitored retrievable storage facility. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-02-01

    This Environmental Assessment (EA) supports the DOE proposal to Congress to construct and operate a facility for monitored retrievable storage (MRS) of spent fuel at a site on the Clinch River in the Roane County portion of Oak Ridge, Tennessee. The first part of this document is an assessment of the value of, need for, and feasibility of an MRS facility as an integral component of the waste management system. The second part is an assessment and comparison of the potential environmental impacts projected for each of six site-design combinations. The MRS facility would be centrally located with respect to existing reactors, and would receive and canister spent fuel in preparation for shipment to and disposal in a geologic repository. 207 refs., 57 figs., 132 tabs.

  12. Environmental Monitoring and Mitigation Plan for site characterization:

    International Nuclear Information System (INIS)

    1988-01-01

    The DOE is committed to conduct its operations in an environmentally safe and sound manner, and will comply with the letter and the spirit of applicable environmental statues and regulations. This document - the NNWSI Project's Environmental Regulatory Compliance Plan (ERCP) - is one means of implementing the policy. The ERCP describes the plan by which the NNWSI Project Office will comply with applicable environmental statutes and regulations. The ERCP also discusses how DOE will address State and local environmental statues and regulations. To achieve the goals of DOE, the ERCP will be developed in phases. This version of the ERCP is the first phase in this development. It represents the NNWSI Project's understanding of environmental regulatory requirements for site characterization of Yucca Mountain. After consultation with appropriate Federal and State agencies, the ERCP will be updated to reflect the results of these consultations. 29 figs., 1 tab

  13. Environmental monitoring systems: a new type of mobile laboratory

    International Nuclear Information System (INIS)

    Bruecher, L.; Langmueller, G.; Tuerschmann, G.

    1999-01-01

    Nuclear facilities are obligated to monitor the environmental radiation in their vicinity, which is often fulfilled by monitoring cars, combined with fixed monitoring stations. The MOLAR Mobile Laboratory for Environmental Radiation Monitoring as described here is being used under normal and accident conditions as a spot check monitoring system or to perform continuous measurements along a driving track. The mobile laboratories are continuously connected with the control centre's CRCS Central Radiological Computer System, where the RIS Radiological Information System provides corresponding evaluation functions. The mobile labs contain measuring and controlling units like γ-dose rate monitors, γ-spectrometer with a HpGe High Purity Germanium detector, a lead shielded measuring cell and MCA Multi-Channel Analyser, portable β-contamination monitor, α/β/γ multipurpose quick measuring unit, aerosol and iodine sampling units. The collected samples are safely stored for the transport to the environmental laboratory for being analysed later. The geographical location of the moving car is continuously determined by the satellite based GPS Global Positioning System and transferred in the on-board rack mounted computer system for being stored and locally displayed. Real-time data transmission via radio and mobile phone is continuously performed to supply the RIS Radiological Information System in the control centre via radio and mobile phone. The latter also serves for voice communication. Currently three MOLAR systems can be operated parallel and independent from the control centre. The system is ready to be extended to more mobile labs. This combination of mobile monitoring, sample analysis and radiological assessment of environmental data in combination with process occurrences has turned out to be a powerful instrument for emergency preparedness and environmental supervising. (orig.) [de

  14. Portsmouth Uranium Enrichment Complex environmental monitoring report for calendar year 1985

    International Nuclear Information System (INIS)

    1986-05-01

    At the Portsmouth Uranium Enrichment Complex all effluent streams are sampled regularly and analyzed to assess compliance with applicable environmental standards. Radioactivity is measured in air, water, fish, produce, soil, sediments and vegetation; and radiation doses to the public are calculated. The calculated public radiation doses from process effluents are within US Department of Energy (DOE) and US Environmental protection Agency (USEPA) standards. An extensive amount of engineering effort is underway to modify existing airborne radioactivity emissions sources to further reduce emissions in compliance with DOE policy. Non-radioactive effluents either presently comply with federal standards or will comply upon completion of planned projects. CY-1985 was the fifth full year under the current National Pullutant Discharge Elimination System (NPDES) permit for liquid effluents, and the third year since the Ohio Environmental Protection Agency (OEPA) assumed responsibility for administering the NPDES program. Compliance with the permit's discharge limits, with the exception of violations due to the Coal Pile Treatment Facility and the Biodenitrification Plant for which projects to improve performance are currently underway, did not present any significant problems. Overall compliance was 95.5%. There was increased activity in the areas of groundwater monitoring, hazardous waste and PCB waste management to comply with Federal regulations

  15. Smart Sensing Technology for Agriculture and Environmental Monitoring

    CERN Document Server

    2012-01-01

    The book focuses on the different aspects of sensing technology, i.e. high reliability, adaptability, recalibration, information processing, data fusion, validation and integration of novel and high performance sensors specifically aims to monitor agricultural and environmental parameters.   This book is dedicated to Sensing systems for Agricultural and Environmental Monitoring  offers to variety of users, namely, Master and PhD degree students, researchers, practitioners, especially Agriculture and Environmental engineers. The book will provide an opportunity of a dedicated and a deep approach in order to improve their knowledge in this specific field.

  16. Survey monitoring of environmental radioactivity in Gwangju area

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Jeong Ju; Na, Jeong Yeun [Chonnam National Univ., Gwangju (Korea, Republic of)

    2000-12-15

    The objectives of this project are to detect radiation abnormalities in its early stage, to survey the regional environmental radiation/radioactivity levels and the variations of the levels, to prepare the capability of managing the radiological emergencies, and finally to extabish the protective and defence systems against the radiological hazards for the general publics. This report presents the levels of the external gamma dose rates, the gross {beta} - activities in the natural samples, such as airborne dust, fallout, precipitation, and tap water, which were continuously monitored at the environmental research institute at CNU in 2000, and also the levels of the {gamma} - activities in food samples and drinking water which were measured to collect the basic data of the regional environmental radioactivity levels around the Kwangju city and Chonnam province. The levels of the {gamma} - and gross {beta} - activities in the natural samples didn't any significant abnormality in 2000 and were similar to the results obtained in the past years. Also levels of the {gamma} - activities of Cs-137 in those samples were below the MDA values. The {gamma} - activities in almost all food samples, except for a few food samples, and drinking water samples were measured to be below the MDA values.

  17. Surface Environmental Surveillance Project: Locations Manual Volume 1 – Air and Water Volume 2 – Farm Products, Soil & Vegetation, and Wildlife

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, Brad G.; Patton, Gregory W.; Stegen, Amanda; Poston, Ted M.

    2009-01-01

    This report describes all environmental monitoring locations associated with the Surface Environmental Surveillance Project. Environmental surveillance of the Hanford site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 450.1, Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The environmental surveillance sampling design is described in the Hanford Site Environmental Monitoring Plan, United States Department of Energy, Richland Operation Office (DOE/RL-91-50). This document contains the locations of sites used to collect samples for the Surface Environmental Surveillance Project (SESP). Each section includes directions, maps, and pictures of the locations. A general knowledge of roads and highways on and around the Hanford Site is necessary to successfully use this manual. Supplemental information (Maps, Gazetteer, etc.) may be necessary if user is unfamiliar with local routes. The SESP is a multimedia environmental surveillance effort to measure the concentrations of radionuclides and chemicals in environmental media to demonstrate compliance with applicable environmental quality standards and public exposure limits, and assessing environmental impacts. Project personnel annually collect selected samples of ambient air, surface water, agricultural products, fish, wildlife, and sediments. Soil and vegetation samples are collected approximately every 5 years. Analytical capabilities include the measurement of radionuclides at very low environmental concentrations and, in selected media, nonradiological chemicals including metals, anions, volatile organic compounds, and total organic carbon.

  18. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    International Nuclear Information System (INIS)

    Jannik, G.T.

    1994-01-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan's purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements

  19. The Westinghouse Hanford Company Operational Environmental Monitoring Program CY-93

    International Nuclear Information System (INIS)

    Schmidt, J.W.

    1993-10-01

    The Operational Environmental Monitoring Program (OEMP) provides facility-specific environmental monitoring to protect the environment adjacent to facilities under the responsibility of Westinghouse Hanford Company (WHC) and assure compliance with WHC requirements and local, state, and federal environmental regulations. The objectives of the OEMP are to evaluate: compliance with federal (DOE, EPA), state, and internal WHC environmental radiation protection requirements and guides; performance of radioactive waste confinement systems; and trends of radioactive materials in the environment at and adjacent to nuclear facilities and waste disposal sites. This paper identifies the monitoring responsibilities and current program status for each area of responsibility

  20. Environmental monitoring around the Nuclear Power Plants (NPPs) in India

    International Nuclear Information System (INIS)

    Ravi, P.M.

    2014-01-01

    Environmental Survey Laboratories (ESLs) are established at all major nuclear installations before the commissioning of an installation. As per the lndian regulations, the environmental monitoring around NPPs are carried out by an independent body. Accordingly, Environmental Survey Laboratories (ESLs) under Health Physics Division, Bhabha Atomic Research Centre is entrusted with the responsibility. This paper presents the various aspects of environmental monitoring programmes being pursued around Indian NPPs

  1. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  3. Effluent and environmental monitoring of Chalk River Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Pilgrim, T.; De Waele, C.; Gallagher, C. [Atomic Energy of Canada Limited, Chalk River, ON (Canada)

    2014-07-01

    Atomic Energy of Canada Limited's (AECL's) Environmental Protection Program has been gathering environmental monitoring data at its Chalk River Laboratories (CRL) for over 60 years. The comprehensive effluent and environmental monitoring program at CRL consists of more than 600 sampling locations, including the Ottawa River, with approximately 60,000 analyses performed on air and liquid effluent parameters each year. Monitoring for a variety of radiological and non-radiological parameters is regularly conducted on various media, including ambient air, foodstuff (e.g. milk, fish, garden produce, large game, and farm animals), groundwater, Ottawa River water and other surface water on and off-site. The purpose of the monitoring program is to verify that past and current radiological and non-radiological emissions derived from AECL operations and activities, such as process water effluent into the Ottawa River, are below regulatory limits and demonstrate that CRL operations do not negatively affect the quality of water on or leaving the site. In fact, ongoing program reports demonstrate that radiological emissions are well below regulatory limits and have been declining for the past five years, and that non-radiological contaminants do not negatively affect the quality of water on and off the site. Two updated Canadian Standards Association (CSA) standards for Effluent and Environmental monitoring have come into effect and have resulted in some changes to the AECL Program. This presentation will discuss effluent and surface water monitoring results, the observed trends, the changes triggered by the CSA standards, and a path forward for the future. (author)

  4. Steps in formulating an environmental monitoring program

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This section describes the process of establishing a complete equipment environmental monitoring program; the step by step process is also illustrated in Table 3 of the Summary. The following decisions must be made in defining the program: an initial characterization of plant environment, how to integrate with existing programs to realize the maximum benefits, identification of the specific monitoring locations, determining the monitoring techniques, frequency of recording data, monitoring duration, quality assurance requirements, and finally, establishing the recordkeeping requirements

  5. Offsite environmental monitoring report. Radiation monitoring around United States nuclear test areas, calendar year 1980

    International Nuclear Information System (INIS)

    Smith, D.D.; Grossman, R.F.; Corkern, W.D.; Thome, D.J.; Patzer, R.G.; Hopper, J.L.

    1981-06-01

    The US Environmental Protection Agency's (EPA) Environmental Monitoring Systems Laboratory in Las Vegas (EMSL-LV) continued its Offsite Radiological Safety Program for the Nevada Test Site (NTS) and other sites of past underground nuclear tests. For each test, the Laboratory provided airborne meteorological measurements, ground and airborne radiation monitoring teams, and special briefings to the Test Controller's Advisory Panel. Test-related radioactivity from the NTS was detected offsite following the Riola Test conducted on September 25, 1980. This consisted of xenon-133 (3.4 x 10 -11 μCi/m1) and xenon-135 (3.6 x 10 -10 μCi/m1) in a compressed air sample collected at Lathrop Wells, Nevada. The estimated dose equivalent to the whole body of a hypothetical receptor at Lathrop Wells from exposure to the radioxenon was 0.011 mrem, which is 0.006 percent of the radiation protection guide for a suitable sample of the general population. Whole-body counts of individuals residing in the environs of the NTS showed no manmade radionuclides attributable to the testing program. The only radioactivity from non-NTS sites of past underground nuclear tests was due to tritium in water samples collected from the Project Dribble Site near Hattiesburg, Mississippi, and the Project Long Shot Site on Amchitka Island, Alaska. The maximum concentrations measured at these locations were 1 and 0.1 percent of the Concentration Guide for drinking water, respectively. A small amount of airborne radioactivity originating from nuclear tests carried out by the People's Republic of China was detected during 1980 at some stations scattered throughout the Air Surveillance Network. The Laboratory's Animal Investigation Program sampled tissues from wildlife and domestic animals on and around the NTS. Data from analysis of these tissues are published separately in an annual report

  6. Environmental monitoring in the vicinity of nuclear facilities

    International Nuclear Information System (INIS)

    Jacomino, V.M.F.; Maduar, M.F.

    1992-02-01

    The purpose of this manual is to provide guidance for setting up programmes of environmental monitoring in the vicinity of establishments in a normal condition of operation. It intends to contribute for trainning of technicians working in the nuclear field. In order to illustrate the application of the basic principles described in this manual, the routine environmental monitoring programme carried out in the IPEN-CNEN/SP is presented. (author)

  7. Environmental monitoring with a portable TLD system

    Energy Technology Data Exchange (ETDEWEB)

    Szabo, P P; Feher, I; Deme, S; Szabo, B; Vagvoelgyi, J; German, E [Hungarian Academy of Sciences, Budapest. Central Research Inst. for Physics

    1984-01-01

    Two types of TLD systems are used for environmental dose monitoring. One is based on an NHZ-203 laboratory TLD reader and CaSO/sub 4/:Dy powder. The other is based on CaSO/sub 4/:Tm bulbs and a small, portable TLD reader built into a cross-country car and operated by means of the car battery. The laboratory TLD system has been used for many years for environmental monitoring and it has been tested and proved satisfactory at international intercomparisons for environmental dosemeters. The new portable TLD system has the advantage of being able to establish the dose in a few minutes at the environmental station. The transport dose is omitted as the TLDs are evaluated at the field site. The evaluation of a bulb needs only a few minutes and the measured dose value can be reported back by radio - an important aspect during an emergency situation.

  8. Do environmental projects promote gender equity?

    Science.gov (United States)

    Joekes, S

    1995-02-01

    In the 1980s, governments and development agencies began to recognize the need to consider gender issues in their environmental and natural resource management programs. First came the understanding that women play a vital role in the management of natural resources and often have a strong traditional and contemporary knowledge of their environment. To exclude them would damage the efficacy of any project. Next, donor agencies came to view women, in their roles as environmental managers, as vulnerable victims of and contributors to environmental degradation. When awareness grew of examples of women successfully fighting to conserve local resources, women were considered important local assets to be used in efforts toward better environmental management. New environmental projects began by asking whether the protected resource was used by men or women in order to target the crucial people. For example, when planning to preserve forests, it is useful to recognize that men typically use wood for construction and fencing, while women use it for cooking fires. It has become increasingly common for women to participate in water and sanitation committees. But good intentions have often been subverted. Community level management of environmental projects does not guarantee female participation. Sometimes involving women means that women do all the physical labor without receiving their fair share of the benefits. In areas where women's property rights are restricted, women will have little authority in resource management. Legal reforms are needed, but they must be complemented at the local level by collective action.

  9. PNC/DOE Remote Monitoring Project at Japan's Joyo Facility

    International Nuclear Information System (INIS)

    Ross, M.; Hashimoto, Yu; Sonnier, C.; Dupree, S.; Ystesund, K.; Hale, W.

    1996-01-01

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan and the US Department of Energy (DOE) are cooperating on the development of a remote monitoring system for nuclear nonproliferation efforts. This cooperation is part of a broader safeguards agreement between PNC and DOE. A remote monitoring system is being installed in a spent fuel storage area at PNC's experimental reactor facility Joyo in Oarai. The system has been designed by Sandia National Laboratories (SNL) and is closely related to those used in other SNL remote monitoring projects. The Joyo project will particularly study the unique aspects of remote monitoring in contribution to nuclear nonproliferation. The project will also test and evaluate the fundamental design and implementation of the remote monitoring system in its application to regional and international safeguards efficiency. This paper will present a short history of the cooperation, the details of the monitoring system and a general schedule of activities

  10. 2009 review of the Deep Panuke Environmental Effects Monitoring Plan

    International Nuclear Information System (INIS)

    2010-01-01

    The Oceans, Habitat and Species at Risk branch of the Department of Fisheries and Oceans Canada requested an update to the Environmental Management Plan for the construction of the Deep Panuke Project. Specifically, it requested expert advice on the 2009-2010 Drilling Environmental Protection Plan/Environmental Effects Monitoring Plan (EPP/EEMP), which outlines the measures that EnCana proposes take to avoid or minimize the effects of drilling in the marine environment. Although the proposed approach was deemed to be sufficient, the EPP/EEMP did not make reference to the potential effects of noise on marine species. The jack-up rig mobile offshore production unit that is proposed for well drilling and well re-entries was considered to produce lower noise levels than drillships and semi submersibles. It was concluded that jack up drilling at Deep Panuke would not likely require special noise mitigation measures, but more extensive measurement and documentation of acoustic noise levels around active rigs is recommended. The risk of well blowout or collapse was deemed low. Should such an event occur, the impact of the released hydrocarbon condensate would depend on the rate and duration of the release. Under typical conditions, the proponent's models reasonably show the blowout discharge drifting away from Sable Island. However, there is a very low risk that certain weather conditions would result in an oil spill reaching Sable Island. The EPP/EEMP does not address species at risk in any way, and mitigation measures are required and should be detailed in the monitoring plan. It was concluded that the proposed EPP/EEMP is sufficient in many areas, but since most mitigation measures are based on theoretical considerations alone, a plan for field monitoring at the drilling site is needed. 3 refs.

  11. Geophysical monitoring of active hydrologic processes as part of the Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    Newmark, R.L.

    1992-05-01

    Lawrence Livermore National Laboratory, in collaboration with University of California at Berkeley and Lawrence Berkeley Laboratory, is conducting the Dynamic Underground Stripping Project (DUSP), an integrated project demonstrating the use of active thermal techniques to remove subsurface organic contamination. Complementary techniques address a number of environmental restoration problems: (1) steam flood strips organic contaminants from permeable zones, (2) electrical heating drives contaminants from less permeable zones into the more permeable zones from which they can be extracted, and (3) geophysical monitoring tracks and images the progress of the thermal fronts, providing feedback and control of the active processes. The first DUSP phase involved combined steam injection and vapor extraction in a ''clean'' site in the Livermore Valley consisting of unconsolidated alluvial interbeds of clays, sands and gravels. Steam passed rapidly through a high-permeability gravel unit, where in situ temperatures reached 117 degree C. An integrated program of geophysical monitoring was carried out at the Clean Site. We performed electrical resistance tomography (ERT), seismic tomography (crossborehole), induction tomography, passive seismic monitoring, a variety of different temperature measurement techniques and conventional geophysical well logging

  12. Environmental monitoring plan, July 1--December 31, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The Tennessee Department of Environment and Conservation, DOE Oversight Division (TDEC/DOE-O) under the terms of the Tennessee Oversight Agreement (TOA) are providing annual reports: reporting of State's monitoring and analysis, and findings of DOE's quality and effectiveness of DOE's monitoring and surveillance. This report blends some of both of the required annual reports as described in the TOA section A.7.2.2. The Federal Facilities Agreement (FFA) integrates the Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) for the Oak Ridge Reservation. This report presents the results of environmental monitoring in Tennessee in the following areas: surface waters; ground water; air; and fish and wildlife. In addition, radiation monitoring has been conducted in all of these areas

  13. Environmental radiation monitoring system with GPS (global positioning system)

    International Nuclear Information System (INIS)

    Komoto, Itsuro

    2000-01-01

    This system combines a radiation monitoring car with GPS and a data processor (personal computer). It distributes the position information acquired through GPS to the data such as measured environmental radiation dose rate and energy spectrum. It also displays and edits the data for each measuring position on a map. Transmitting the data to the power station through mobile phone enables plan managers to easily monitor the environmental radiation dose rate nearby and proper emergency monitoring. (author)

  14. Environmental monitoring at the Savannah River Plant. Annual report, 1984

    International Nuclear Information System (INIS)

    Zeigler, C.C.; Lawrimore, I.B.; O'Rear, W.E.

    1985-06-01

    Ensuring the radiation safety of the public in the vicinity of the Savannah River Plant was a foremost consideration in the design of the plant and has continued to be a primary objective during 31 years of SRP operations. An extensive surveillance program has been continuously maintained since 1951 (before SRP startup) to determine the concentrations of radionuclides in the environment of the plant. The results of this comprehensive monitoring program are reported annually in two publications. The first, ''Savannah River Plant Environmental Report for 1984'' [DPSPU85-30-1], contains radiation dose data, routine radiological and nonradiological environmental surveillance activities, summaries of environmental protection programs that are in progress, summaries of sitewide environmental research and management programs, and a summary of National Environmental Policy Act (NEPA) activities. This report is the second and contains primarily radiation dose data and radiological and nonradiological monitoring data both onsite and offsite. It is placed in Department of Energy (DOE) reading rooms and is available to the public upon request. A listing of corresponding reports that have been issued since before plant startup is presented in Appendix A. The scope of the environmental monitoring program at SRP has increased significantly during the years since plant startup. The change is reflected in annual reports. Prior to the mid-1970's the reports contained primarily radiological monitoring data. Beginning in the mid-1970's the reports started including more and more nonradiological monitoring data as those programs increased. The nonradiological monitoring program now approaches the size and extensiveness of the radiological monitoring program

  15. Pinellas Plant environmental monitoring report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    The effluent and environmental monitoring programs maintained by the Pinellas Plant are designed to determine the efficiencies of treatment and control mechanisms for environmental releases; to provide measurements of discharge concentrations for comparison with applicable standards; and to assess the concentrations of these discharges in the on-site and off-site environment. This report was prepared in accordance with the reporting requirements of USDOE Draft Order 5484.1A, ''Environmental Protection, Safety, and Health Protection Information Reporting Requirements.'' All radiological and chemical effluents were found in compliance

  16. Environmental monitoring, restoration and assessment: What have we learned

    Energy Technology Data Exchange (ETDEWEB)

    Gray, R.H. (ed.)

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort How do we decide when enough monitoring is enough Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes Are current regulatory requirements too restrictive or too lenient Can monitoring and assessment be made more cost effective Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases.

  17. Environmental monitoring, restoration and assessment: What have we learned?

    International Nuclear Information System (INIS)

    Gray, R.H.

    1990-01-01

    The Twenty-Eighth Hanford Symposium on Health and the Environment was held in Richland, Washington, October 16--19, 1989. The symposium was sponsored by the US Department of Energy and the Pacific Northwest Laboratory, operated by Battelle Memorial Institute. The symposium was organized to review and evaluate some of the monitoring and assessment programs that have been conducted or are currently in place. Potential health and environmental effects of energy-related and other industrial activities have been monitored and assessed at various government and private facilities for over three decades. Most monitoring is required under government regulations; some monitoring is implemented because facility operators consider it prudent practice. As a result of these activities, there is now a substantial radiological, physical, and chemical data base for various environmental components, both in the United States and abroad. Symposium participants, both platform and poster presenters, were asked to consider, among other topics, the following: Has the expenditure of millions of dollars for radiological monitoring and assessment activities been worth the effort? How do we decide when enough monitoring is enough? Can we adequately assess the impacts of nonradiological components -- both inorganic and organic -- of wastes? Are current regulatory requirements too restrictive or too lenient? Can monitoring and assessment be made more cost effective? Papers were solicited in the areas of environmental monitoring; environmental regulations; remediation, restoration, and decommissioning; modeling and dose assessment; uncertainty, design, and data analysis; and data management and quality assurance. Individual reports are processed separately for the databases

  18. Beaufort Region Environmental Assessment and Monitoring program (BREAM). Final report for 1992/1993

    International Nuclear Information System (INIS)

    Vonk, P.; Duval, W.; Thomas, D.

    1993-01-01

    The Beaufort Region Environmental Assessment and Monitoring (BREAM) program was established to identify environmental research and monitoring priorities related to future hydrocarbon development activities in the Beaufort Sea and Mackenzie Delta region. The activities occurring during the third year of BREAM focused on major oil spills. Three planning meetings were held: a Project Initiation Meeting and technical meetings of the Community-Based Concerns and Catastrophic Oil Spill Working Groups. The initiation meeting had goals that included identifying specific tasks to be completed by the two Working Groups, discussion of contents and scope of materials being prepared for an oil spill workshop, and determining project schedules. The Community-Based Concerns group focused its work on identifying ecological concerns related to oil spills and their cleanup, identifying community-based ecological issues and concerns, and incorporating local and traditional knowledge into the BREAM program. The group suggested changes to the wording of existing impact hypotheses and oil spill scenarios, and recommended changes in a list of valued ecosystem components. The oil spill group reviewed ecological concerns related to oil spills, and reviewed each oil spill scenario and impact hypothesis selected for an interdisciplinary workshop held in February 1993. The workshop evaluated four of the most important oil spill impact hypotheses (offshore platform blowout, river barge spill of diesel fuel, under-ice spill from a pipeline river crossing, and a pipeline spill affecting mammals). Further research and monitoring related to a number of impact hypotheses was recommended by workshop participants. 57 refs., 29 figs., 12 tabs

  19. Monitoring environmental exposures with semen assays

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Semen studies in humans and animals have yielded extensive and compelling evidence that sperm can be used to assess reproductive potential and diagnose pathology. More recent studies on mutagens and carcinogens both at this and other laboratories suggest that a combination of mouse and human assays can be an efficient, effective approach to monitoring for reproductive hazards in the environment. We are investigating the potential of using variability in sperm morphology and DNA content to quantify and monitor the effects of environmental agents on the human testes. Here we review the status of human and mouse assays for environmental surveillance, discuss the genetic and fertility implications of chemically induced semen changes, and describe the high-speed flow methods being developed to automate sperm assays

  20. Extended Community: An Oral History of the Community Environmental Monitoring Program (CEMP), 1989 - 2003

    Energy Technology Data Exchange (ETDEWEB)

    Susan DeSilva

    2004-07-01

    Studying the Community Environmental Monitoring Program (CEMP) provides a unique opportunity to trace a concept created by two nuclear industry originators from inception, as it transitioned through several stewardship agencies, to management by a non-profit organization. This transition is informed not only by changes over two decades in the views of the general populace toward nuclear testing but also by changing political climates and public policies. Several parallel histories accompanied the development of the CEMP: an administrative history, an environmental history, and a history of changing public perception of not only nuclear testing, but other activities involving radiation such as waste transportation, as well. Although vital, those histories will be provided only as background to the subject of this study, the oral histories gathered in this project. The oral histories collected open a window into the nuclear testing history of Nevada and Utah that has not heretofore been opened. The nuclear industry has generated a great deal of positive and negative reaction since its inception. The CEMP emerged with specific objectives. It was designed to provide information to potential downwind communities and counter negative perceptions by creating more community involvement and education about the testing. The current objectives of the program are to: (1) Manage and maintain the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) offsite monitoring program including 26 radiation and environmental monitoring stations with associated equipment. Provide air sample collection and analysis, radiological and meteorological data collection, interpretation and reporting. (2) Facilitate independent operation of radiological monitoring stations and data verification by private citizens living in communities in proximity to the Nevada Test Site (NTS). (3) Hire and initiate training of local citizens to serve as Community

  1. Extended Community: An Oral History of the Community Environmental Monitoring Program (CEMP), 1989 - 2003

    International Nuclear Information System (INIS)

    Susan DeSilva

    2004-01-01

    Studying the Community Environmental Monitoring Program (CEMP) provides a unique opportunity to trace a concept created by two nuclear industry originators from inception, as it transitioned through several stewardship agencies, to management by a non-profit organization. This transition is informed not only by changes over two decades in the views of the general populace toward nuclear testing but also by changing political climates and public policies. Several parallel histories accompanied the development of the CEMP: an administrative history, an environmental history, and a history of changing public perception of not only nuclear testing, but other activities involving radiation such as waste transportation, as well. Although vital, those histories will be provided only as background to the subject of this study, the oral histories gathered in this project. The oral histories collected open a window into the nuclear testing history of Nevada and Utah that has not heretofore been opened. The nuclear industry has generated a great deal of positive and negative reaction since its inception. The CEMP emerged with specific objectives. It was designed to provide information to potential downwind communities and counter negative perceptions by creating more community involvement and education about the testing. The current objectives of the program are to: (1) Manage and maintain the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) offsite monitoring program including 26 radiation and environmental monitoring stations with associated equipment. Provide air sample collection and analysis, radiological and meteorological data collection, interpretation and reporting. (2) Facilitate independent operation of radiological monitoring stations and data verification by private citizens living in communities in proximity to the Nevada Test Site (NTS). (3) Hire and initiate training of local citizens to serve as Community

  2. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  3. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  4. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  5. Environmental monitoring for tritium at tritium separation facility

    International Nuclear Information System (INIS)

    Varlam, C.; Stefanescu, I.; Steflea, D.; Lazar, R.E.

    2001-01-01

    The Cryogenic Pilot is an experimental project in the nuclear energy national research program, which has the aim of developing technologies for tritium and deuterium separation by cryogenic distillation. The experimental installation is located 15 km near the highest city of the area and 1 km near Olt River. An important chemical activity is developed in the area and the Experimental Cryogenic Pilot's, almost the entire neighborhood are chemical plants. It is necessary to emphasize this aspect because the sewerage system is connected with the other three chemical plants from the neighborhood. This is the reason that we progressively established elements of an environmental monitoring program well in advance of tritium operation in order to determine baseline levels. The first step was the tritium level monitoring in environmental water and waste water of industrial activity from neighborhood. In this work, a low background liquid scintillation is used to determine tritium activity concentration according to ISO 9698/1998. We measured drinking water, precipitation, river water, underground water and waste water. The tritium level was between 10 TU and 27 TU that indicates there is no source of tritium contamination in the neighborhood of Cryogenic Pilot. In order to determine baseline levels we decide to monitories monthly each location. In this paper a standard method is presented which it is used for tritium determination in water sample, the precautions needed in order to achieve reliable results, and the evolution of tritium level in different location near the Experimental Pilot Tritium and Deuterium Cryogenic Separation.(author)

  6. Blue Bahia: an environmental sanitation project

    International Nuclear Information System (INIS)

    Azcona, Miguel Angel L.; Neuvirth, Bruno

    1996-01-01

    The paper presents actions developed to incorporate some aspects of environmental sanitation to the basic sanitation project, natural resources assessing, identification of the environmental degradation sources - in addition to those caused by lack of basic sanitation, and common action between public and private sectors

  7. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  8. Remote environmental monitoring of the upper sea (REMUS) : Implementation in the strait of Gibraltar

    International Nuclear Information System (INIS)

    Mrabet, R.El.; Dehbi, N.; Khoukhi, T.El.; Laissaoui, A.; Delecaut, G.; Lacroix, J.P.; Abril, J.M.

    2008-01-01

    Full text: Interest in the need of environmental monitoring in the Gibraltar strait, in which a wide range of oceanic processes and interactions of global interest occur, has recently increased in order to ensure proper surveillance and control of marine pollution and consequently to complying with international recommendations and binding agreements pertaining to the protection of marine environment. The effects of the english submarine incident (end 2000) in the Gibraltar strait and the radiological incident of Algeciras, Spain (melting of a Cs- 137 source at a steel manufactory ACENIROX) suggest an adequate national and regional technical capabilities and expertise for long-term environmental monitoring as a key to control the area and to develop emergency model in the case of any future accident in the zone. REMUS involves new technologic developments that allow real-time and continuous remote monitoring of sea areas using autonomous probes in anchored buoys, powered with solar panels and equipped with low consumption sensors and one onboard PC that communicates via GSM with central laboratory in land. Sensors incorporate a very sensitive (few Bq m -3 ) NaI detector for gamma-emitting radionuclides, oceanographic instruments (current meters, CTDs), and chemical sensors (pH,chlorophyl1,..). This technology allows the remote environmental monitoring of the upper sea (although some additional sensors can be equally deployed in depth) combining the interest in the early detection of environmental risks (releases of many hazardous materials) and the fundmental research in marine systems, as chalenge in the preservation of natural resources and the human health through the knowledge. Thus, the development of predictive models is also one objective of this project. [fr

  9. Active Sites Environmental Monitoring Program: FY 1990 annual report

    International Nuclear Information System (INIS)

    Wickliff, D.S.; Morrissey, C.M.; Ashwood, T.L.

    1991-10-01

    Chapter 3 of US Department of Energy (DOE) Order 5820.2A (DOE 1988) sets forth requirements for environmental monitoring of active low-level waste (LLW) disposal sites. Active sites are defined as those LLW facilities that were in use on or after the date of the order (September 1988). The transuranic (TRU) waste storage areas in Solid Waste Storage Area (SWSA) 5 North are covered by Chap. 2 of the order. In both chapters, monitoring is required to provide for early warning of leaks before those leaks pose a threat to human health or the environment. Chapter 3 also requires that monitoring be conducted to evaluate the short- and long-term performance of LLW disposal facilities. In accordance with this order, the Solid Waste Operations Department at Oak Ridge National Laboratory (ORNL) has established an Active Sites Environmental Monitoring Program (ASEMP) that is implemented by staff of the Environmental Sciences Division (ESD) at ORNL. This report summarizes data from ASEMP monitoring activities for the final 6 months of FY 1990. A brief summary of the monitoring methodology for each site is presented also

  10. Monitoring of environmental radioactivity

    International Nuclear Information System (INIS)

    1986-01-01

    The results are described of monitoring radioactivity of atmospheric fallout, surface waters, soils, plant feeds, cereals, and other agricultural produce. The results were obtained over a long time period. Radioactivity was also measured of milk, milk products, vegetables and fruits, meat and hen eggs, flour and bakery products with a view to radionuclide migration in the food chain. The daily intake of 90 Sr and 137 Cs from food was determined from the values obtained and the consumption of the individual types of food. Strontium-90 distribution was studied in the bones and the teeth of the population in Slovakia. With the commissioning of nuclear power plants, emissions and liquid wastes were monitored and their environmental impact assessed. (E.S.)

  11. Environmental radioactivity survey in Andong

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Zi Hong; Jo, Kum Ju [Andong Regional Radioactivity Monitoring Station, Andong National Univ., Andong (Korea, Republic of)

    2003-12-15

    The objectives of the project are to monitor an abnormal level in Andong area and to provide a base line data on environmental radiation/radioactivity levels in case of any radiological emergency situation. The project is important in view of protecting the public health from the potential hazards of radiation and keeping up the clean environment. This report simonizes and interprets environmental radiation/radioactivity monitoring samples : Gamma exposure rates, airborne dust, precipitation, fall out and drinking-water. Environmental samples 2 kinds of indicator plant, 4 kinds of mushroom, 7 kinds of nut and seeds, and drinking waters. Among the all 2003 radiological monitoring and environmental data in Andong area were not found the extraordinary data. And a nation-wide environmental radiation/radioactivity level survey results were all background levels attributed to terrestrial and cosmic radiation.

  12. Environmental radioactivity survey in Andong

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Zi Hong; Jo, Kum Ju [Andong Regional Radioactivity Monitoring Station, Andong National Univ., Andong (Korea, Republic of)

    2002-12-15

    The objectives of the project are to monitor an abnormal level in Andong area and to provide a base-line data on environmental radiation/radioactivity levels in case of any radiological emergency situation. The project is important in view of protecting the public health from the potential hazards of radiation and keeping up the clean environment. This report summarizes and interprets environmental radiation/radioactivity monitoring samples Gamma exposure rates, airborne dust, precipitation, fall-out and drinking-water. Environmental samples 2 kinds of indicator plant, 4 kinds of mushroom, 7 kinds of nut and seeds, and drinking waters. Among the all 2002 radiological monitoring and environmental data in Andong area were not found the extraordinary data. And a nation-wide environmental radiation/radioactivity level survey results were all background levels attributed to terrestrial and cosmic radiation.

  13. Portsmouth Gaseous Diffusion Plant environmental monitoring report for calendar year 1981

    International Nuclear Information System (INIS)

    Acox, T.A.; Anderson, R.E.; Hary, L.F.; Klein, L.S.; Vausher, A.L.

    1982-04-01

    At the Portsmouth Gaseous Diffusion Plant all effluent streams are sampled regularly and analyzed to assess compliance with applicable environmental standards. Radioactivity is measured in air, water, food, soil, and sediments; and radiation doses to the public are calculated. All public radiation doses from process effluents are well within Department of Energy and US EPA standards. Non-radioactive effluents either presently comply with federal standards or will comply upon completion of planned projects. The environmental impact of effluents from cleaning and decontamination operations has been reduced through flow reduction and improved chemical treatment. CY-1981 was the first full year under a new National Pollutant Discharge. Elimination System (NPDES) permit for liquid effluents; compliance with the permit's discharge limits did not present any significant problems. Engineering is proceeding on projects to be constructed through 1985 to further reduce the impact of liquid effluents. A new licensed sanitary landfill utilizing the area fill method went into operation in July 1981. Although neither the State of Ohio nor the federal government has established standards for fluoride in the atmosphere or in vegetation, fluorides are monitored because they are used extensively in the gaseous diffusion process

  14. Review of four major environmental effects monitoring programs in the oil sands region

    International Nuclear Information System (INIS)

    Lott, E.O.; Jones, R.K.

    2010-10-01

    The lack of knowledge on current environmental effects monitoring programs for the mineable oil sands region generates a low public confidence in environment health monitoring and reporting programs for the oil sands operations. In 2010, the Oil Sands Research and Information Network (OSRIN) supervised a study reviewing the major environmental effects monitoring programs that are underway in the Regional Municipality of Wood Buffalo. Four main environmental effects monitoring and reporting organizations existing in the oil sands area were engaged to describe their programs through this study: Alberta Biodiversity Monitoring Institute (ABMI), Cumulative Environmental Management Association (CEMA), Regional Aquatic Monitoring Program (RAMP), Wood Buffalo Environmental Association (WBEA). These different organizations have specific roles in providing information, data and understanding of ecosystem effects. A one page visual summary of environmental effects monitoring in the oil sands area resulted from the information received from these organizations and detailed fact sheets were presented for each one of the programs. The report of this study also presents seven other environmental monitoring initiatives or organizations such as Alberta Environment and Environment Canada environmental effects monitoring program. The main observation that emerged from the review was the lack of detailed understanding shown by the stakeholders regarding the monitoring activities performed in the oil sands area. There is a lack of communication of the different programs that are conducted in the region. The study also pointed out that no efforts were put in cross-linking the various programs to be assured that every concerns related to environmental effects associated with oil sands operations were addressed. A better understanding of environmental effects and an improvement in public confidence in the data and its interpretation would probably be observed with the establishment of a

  15. Assessing and monitoring impacts of genetically modified plants on agro-ecosystems: the approach of AMIGA project

    Directory of Open Access Journals (Sweden)

    S. Arpaia

    2014-06-01

    Full Text Available The environmental impacts of genetically modified crops is still a controversial issue in Europe. The overall risk assessment framework has recently been reinforced by the European Food Safety Authority(EFSA and its implementation requires harmonized and efficient methodologies. The EU-funded research project AMIGA − Assessing and monitoring Impacts of Genetically modified plants on Agro-ecosystems − aims to address this issue, by providing a framework that establishes protection goals and baselines for European agro-ecosystems, improves knowledge on the potential long term environmental effects of genetically modified (GM plants, tests the efficacy of the EFSA Guidance Document for the Environmental Risk Assessment, explores new strategies for post market monitoring, and provides a systematic analysis of economic aspects of Genetically Modified crops cultivation in the EU. Research focuses on ecological studies in different EU regions, the sustainability of GM crops is estimated by analysing the functional components of the agro-ecosystems and specific experimental protocols are being developed for this scope.

  16. Environmental impact assessment on the radioactive of a REE separation project

    International Nuclear Information System (INIS)

    Li Nana; Zhu Yucheng; Cai Minqi

    2011-01-01

    Based on the investigation of field actual environment and analysis of radioactive sources, and industrial process techniques, environmental impact of the radioactive from a REE separation project has been analyzed, assessed and forecasted. The investigation and monitoring of actual radioactive in the environment indicated that value of assessment factors remained within the range of natural background level as a whole. The maximum annual individual effective dose for occupational worker and the public were forecasted and were found to be 1.622 mSv/a and 0.029 mSv/a respectively. Both of the values are lower than annual dose limit respectively. The radioactive impact of this project on the environment will comply with the standard limit of law and requirements after the reservation measures are carried out to REE. (authors)

  17. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  18. Solar Wind Monitor--A School Geophysics Project

    Science.gov (United States)

    Robinson, Ian

    2018-01-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth's field in…

  19. Environmental assessment of the Carlsbad Environmental Monitoring and Research Center Facility

    International Nuclear Information System (INIS)

    1995-10-01

    This Environmental Assessment has been prepared to determine if the Carlsbad Environmental Monitoring and Research Center (the Center), or its alternatives would have significant environmental impacts that must be analyzed in an Environmental Impact Statement. DOE's proposed action is to continue funding the Center. While DOE is not funding construction of the planned Center facility, operation of that facility is dependent upon continued funding. To implement the proposed action, the Center would initially construct a facility of approximately 2,300 square meters (25,000 square feet). The Phase 1 laboratory facilities and parking lot will occupy approximately 1.2 hectares (3 acres) of approximately 8.9 hectares (22 acres) of land which were donated to New Mexico State University (NMSU) for this purpose. The facility would contain laboratories to analyze chemical and radioactive materials typical of potential contaminants that could occur in the environment in the vicinity of the DOE Waste Isolation Pilot Plant (WIPP) site or other locations. The facility also would have bioassay facilities to measure radionuclide levels in the general population and in employees of the WIPP. Operation of the Center would meet the DOE requirement for independent monitoring and assessment of environmental impacts associated with the planned disposal of transuranic waste at the WIPP

  20. Environmental assessment of the Carlsbad Environmental Monitoring and Research Center Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This Environmental Assessment has been prepared to determine if the Carlsbad Environmental Monitoring and Research Center (the Center), or its alternatives would have significant environmental impacts that must be analyzed in an Environmental Impact Statement. DOE`s proposed action is to continue funding the Center. While DOE is not funding construction of the planned Center facility, operation of that facility is dependent upon continued funding. To implement the proposed action, the Center would initially construct a facility of approximately 2,300 square meters (25,000 square feet). The Phase 1 laboratory facilities and parking lot will occupy approximately 1.2 hectares (3 acres) of approximately 8.9 hectares (22 acres) of land which were donated to New Mexico State University (NMSU) for this purpose. The facility would contain laboratories to analyze chemical and radioactive materials typical of potential contaminants that could occur in the environment in the vicinity of the DOE Waste Isolation Pilot Plant (WIPP) site or other locations. The facility also would have bioassay facilities to measure radionuclide levels in the general population and in employees of the WIPP. Operation of the Center would meet the DOE requirement for independent monitoring and assessment of environmental impacts associated with the planned disposal of transuranic waste at the WIPP.

  1. Strategic environmental assessment and monitoring: Arctic key gaps and bridging pathways

    International Nuclear Information System (INIS)

    Azcárate, Juan; Balfors, Berit; Bring, Arvid; Destouni, Georgia

    2013-01-01

    The Arctic region undergoes rapid and unprecedented environmental change. Environmental assessment and monitoring is needed to understand and decide how to mitigate and/or adapt to the changes and their impacts on society and ecosystems. This letter analyzes the application of strategic environmental assessment (SEA) and the monitoring, based on environmental observations, that should be part of SEA, elucidates main gaps in both, and proposes an overarching SEA framework to systematically link and improve both with focus on the rapidly changing Arctic region. Shortcomings in the monitoring of environmental change are concretized by examples of main gaps in the observations of Arctic hydroclimatic changes. For relevant identification and efficient reduction of such gaps and remaining uncertainties under typical conditions of limited monitoring resources, the proposed overarching framework for SEA application includes components for explicit gap/uncertainty handling and monitoring, systematically integrated within all steps of the SEA process. The framework further links to adaptive governance, which should explicitly consider key knowledge and information gaps that are identified through and must be handled in the SEA process, and accordingly (re)formulate and promote necessary new or modified monitoring objectives for bridging these gaps. (letter)

  2. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  3. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  4. River Corridor Project Workplace Air Monitoring Technical Basis

    International Nuclear Information System (INIS)

    MANTOOTH, D.S.

    2001-01-01

    This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization

  5. Environmental monitoring network for India

    Science.gov (United States)

    P.V. Sundareshwar; R. Murtugudde; G. Srinivasan; S. Singh; K.J. Ramesh; R. Ramesh; S.B. Verma; D. Agarwal; D. Baldocchi; C.K. Baru; K.K. Baruah; G.R. Chowdhury; V.K. Dadhwal; C.B.S. Dutt; J. Fuentes; Prabhat Gupta; W.W. Hardgrove; M. Howard; C.S. Jha; S. Lal; W.K. Michener; A.P. Mitra; J.T. Morris; R.R. Myneni; M. Naja; R. Nemani; R. Purvaja; S. Raha; S.K. Santhana Vanan; M. Sharma; A. Subramaniam; R. Sukumar; R.R. Twilley; P.R. Zimmerman

    2007-01-01

    Understanding the consequences of global environmental change and its mitigation will require an integrated global effort of comprehensive long-term data collection, synthesis, and action (1). The last decade has seen a dramatic global increase in the number of networked monitoring sites. For example, FLUXNET is a global collection of >300 micrometeorological...

  6. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  7. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  8. Development of a Personal Integrated Environmental Monitoring System

    Directory of Open Access Journals (Sweden)

    Man Sing Wong

    2014-11-01

    Full Text Available Environmental pollution in the urban areas of Hong Kong has become a serious public issue but most urban inhabitants have no means of judging their own living environment in terms of dangerous threshold and overall livability. Currently there exist many low-cost sensors such as ultra-violet, temperature and air quality sensors that provide reasonably accurate data quality. In this paper, the development and evaluation of Integrated Environmental Monitoring System (IEMS are illustrated. This system consists of three components: (i position determination and sensor data collection for real-time geospatial-based environmental monitoring; (ii on-site data communication and visualization with the aid of an Android-based application; and (iii data analysis on a web server. This system has shown to be working well during field tests in a bus journey and a construction site. It provides an effective service platform for collecting environmental data in near real-time, and raises the public awareness of environmental quality in micro-environments.

  9. Quality assurance of environmental gamma radiation monitoring in Slovenia

    International Nuclear Information System (INIS)

    Stuhec, M.; Zorko, B.; Mitic, D.; Miljanic, S.; Ranogajec-Komor, M.

    2006-01-01

    Environmental gamma radiation monitoring established in Slovenia consists of a network of multifunctional gamma monitors (MFMs) based on pairs of Geiger-Mueller counters and a network of measuring sites with high-sensitive thermoluminescence dosemeters. The measuring points are evenly spread across Slovenia, located at the meteorological stations and more densely on additional locations around the Krsko NPP. The MFM network has a 2-fold function with one sensor used for the purpose of early warning system in near surroundings of the NPP and the other, more sensitive, for natural radiation monitoring. The paper summarises activities to establish quality assurance of the environmental gamma radiation measurements in Slovenia, with a critical view of the results in comparison with the international standards and recommendations. While the results of linearity and energy dependence tests were satisfying, on-field intercomparison showed that the inherent signal of one of the monitors (MFM) has to be taken into account in the range of environmental background radiation. (authors)

  10. Evaluation of Monticello Nuclear Power Plant, Environmental Impact Prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Watson, D.G.

    1976-11-01

    This report evaluates quantitatively the nonradiological environmental monitoring programs at Monticello Nuclear Generating Plant. The general objective of the study is to assess the effectiveness of monitoring programs in the measurement of environmental impacts. Specific objectives include the following: (1) Assess the validity of environmental impact predictions made in the Environmental Statement by analysis of nonradiological monitoring data; (2) evaluate the general adequacy of environmental monitoring programs for detecting impacts and their responsiveness to Technical Specifications objectives; (3) assess the adequacy of preoperational monitoring programs in providing a sufficient data base for evaluating operational impacts; (4) identify possible impacts that were not predicted in the environmental statement and identify monitoring activities that need to be added, modified or deleted; and (5) assist in identifying environmental impacts, monitoring methods, and measurement problems that need additional research before quantitative predictions can be attempted. Preoperational as well as operational monitoring data were examined to test the usefulness of baseline information in evaluating impacts. This included an examination of the analytical methods used to measure ecological and physical parameters, and an assessment of sampling periodicity and sensitivity where appropriate data were available

  11. Draft environmental statement related to the Union Carbide Corporation, Gas Hills Uranium Project (Natrona County, Wyoming)

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed action is the renewal of Source Material License SUA-648 issued for the operation of the Gas Hills Uranium Project in Wyoming, near Moneta. The project is an acid leach, ion-exchange, and solvent-extraction uranium ore processing mill at an increased capacity of 500,000 tons per year and the construction of two heap leach facilities in Natrona and Fremont Counties for initial processing of low-grade ore. After analysis of environmental impacts and adverse effects, it is the proposed position of NRC that the license be renewed subject to conditions relating to stabilization of the tailings, reclamation, environmental monitoring, evaluation of any future activity not evaluated by NRC, archeological survey, analysis of unexpected harmful effects, and decommissioning

  12. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations

  13. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  14. National automatic network of environmental radiological monitoring (RENAMORA)

    International Nuclear Information System (INIS)

    Gonzalez M, J.L.; Sanchez H, L.

    2003-01-01

    Inside the programs of Environmental Radiological Surveillance that it carries out the National Commission of Nuclear Security and Safeguards (CNSNS), it develops an National Automatic Network of Environmental Radiological Monitoring (RENAMORA), where it is carried out a registration of speed of environmental dose in continuous and simultaneous forms with the same moment of the measurement. This net allows to account with the meticulous and opportune information that will help to characterize, in dynamics form, the radiological conditions of diverse geographical zones of the country, including the sites that by normative require bigger surveillance, like its are the Laguna Verde Nuclear power station (CNLV), the Nuclear Center of Mexico (ININ) and the Radioactive waste storage center (CADER). This net is in its first development stage; three points inside the state of Veracruz, in the surroundings of the CNLV, already its are operating; the obtained data of rapidity of environmental dose are being stored in a database inside a primary data center located in the facilities of the CNSNS in Mexico city and its will be analyzed according to the project advances. At the moment, its are installing the first ten teams corresponding to the first phase of the RENAMORA (three stages); its are carried out operation tests, transmission, reception and administration of data. The obtained data will be interpreted, analyzed and inter compared to evaluate the risk levels to that it would be hold the population and to determine thresholds that allow to integrate the alarm systems that its had considered for emergency situations. (Author)

  15. Environmental management

    NARCIS (Netherlands)

    Guicherit, R.

    1996-01-01

    Elements of a national environmental management system include: • monitoring networks to establish the prevailing environmental quality; • emission inventories, and projected emission inventories based on population growth, increase of traffic density, and economie growth; taking into account

  16. Programmes and Systems for Source and Environmental Radiation Monitoring

    International Nuclear Information System (INIS)

    2010-01-01

    The discharge of radionuclides to the atmosphere and aquatic environments is a legitimate practice in the nuclear and other industries, hospitals and research. Where appropriate, monitoring of the discharges and of relevant environmental media is an essential regulatory requirement in order to ensure appropriate radiation protection of the public. Such monitoring provides information on the actual amounts of radioactive material discharged and the radionuclide concentrations in the environment, and is needed to demonstrate compliance with authorized limits, to assess the radiation exposure of members of the public and to provide data to aid in the optimization of radiation protection. Uncontrolled releases of radionuclides to the atmosphere and aquatic environments may occur as a result of a nuclear or radiological accident. Again, monitoring at the source of the release and of the environment is necessary. In this case, monitoring is used both to assess the radiation exposure of members of the public and to determine the actions necessary for public protection, including longer term countermeasures. Source and environmental monitoring associated with the release of radionuclides to the environment is the subject of a number of IAEA Safety Standards, particularly IAEA Safety Standard RS-G-1.8 (Environmental and Source Monitoring for Purposes of Radiation Protection). This publication is intended to complement this Safety Guide and, by so doing, replaces Safety Series No. 41 (Objectives and Design of Environmental Monitoring Programmes for Radioactive Contaminants) and Safety Series No. 46 (Monitoring of Airborne and Liquid Radioactive Releases from Nuclear Facilities to the Environment). Like Safety Standard RS-G-1.8, this Safety Report deals with monitoring at the source and in the environment associated with authorized releases of radionuclides to the environment. It also deals with the general issues of emergency monitoring during and in the aftermath of an

  17. Sandia National Laboratories, California Environmental Monitoring Program annual report for 2011.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C.

    2011-03-01

    The annual program report provides detailed information about all aspects of the SNL/California Environmental Monitoring Program. It functions as supporting documentation to the SNL/California Environmental Management System Program Manual. The 2010 program report describes the activities undertaken during the previous year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/California.

  18. Participating in a Citizen Science Monitoring Program: Implications for Environmental Education.

    Directory of Open Access Journals (Sweden)

    Simone Branchini

    Full Text Available Tourism is of growing economical importance to many nations, in particular for developing countries. Although tourism is an important economic vehicle for the host country, its continued growth has led to on-going concerns about its environmental sustainability. Coastal and marine tourism can directly affect the environment through direct and indirect tourist activities. For these reasons tourism sector needs practical actions of sustainability. Several studies have shown how education minimizes the impact on and is proactive for, preserving the natural resources. This paper evaluates the effectiveness of a citizen science program to improve the environmental education of the volunteers, by means of questionnaires provided to participants to a volunteer-based Red Sea coral reef monitoring program (STEproject. Fifteen multiple-choice questions evaluated the level of knowledge on the basic coral reef biology and ecology and the awareness on the impact of human behaviour on the environment. Volunteers filled in questionnaires twice, once at the beginning, before being involved in the project and again at the end of their stay, after several days participation in the program. We found that the participation in STEproject significantly increased both the knowledge of coral reef biology and ecology and the awareness of human behavioural impacts on the environment, but was more effective on the former. We also detected that tourists with a higher education level have a higher initial level of environmental education than less educated people and that the project was more effective on divers than snorkelers. This study has emphasized that citizen science projects have an important and effective educational value and has suggested that tourism and diving stakeholders should increase their commitment and efforts to these programs.

  19. Participating in a Citizen Science Monitoring Program: Implications for Environmental Education

    Science.gov (United States)

    Branchini, Simone; Meschini, Marta; Covi, Claudia; Piccinetti, Corrado; Zaccanti, Francesco; Goffredo, Stefano

    2015-01-01

    Tourism is of growing economical importance to many nations, in particular for developing countries. Although tourism is an important economic vehicle for the host country, its continued growth has led to on-going concerns about its environmental sustainability. Coastal and marine tourism can directly affect the environment through direct and indirect tourist activities. For these reasons tourism sector needs practical actions of sustainability. Several studies have shown how education minimizes the impact on and is proactive for, preserving the natural resources. This paper evaluates the effectiveness of a citizen science program to improve the environmental education of the volunteers, by means of questionnaires provided to participants to a volunteer-based Red Sea coral reef monitoring program (STEproject). Fifteen multiple-choice questions evaluated the level of knowledge on the basic coral reef biology and ecology and the awareness on the impact of human behaviour on the environment. Volunteers filled in questionnaires twice, once at the beginning, before being involved in the project and again at the end of their stay, after several days participation in the program. We found that the participation in STEproject significantly increased both the knowledge of coral reef biology and ecology and the awareness of human behavioural impacts on the environment, but was more effective on the former. We also detected that tourists with a higher education level have a higher initial level of environmental education than less educated people and that the project was more effective on divers than snorkelers. This study has emphasized that citizen science projects have an important and effective educational value and has suggested that tourism and diving stakeholders should increase their commitment and efforts to these programs PMID:26200660

  20. Participating in a Citizen Science Monitoring Program: Implications for Environmental Education.

    Science.gov (United States)

    Branchini, Simone; Meschini, Marta; Covi, Claudia; Piccinetti, Corrado; Zaccanti, Francesco; Goffredo, Stefano

    2015-01-01

    Tourism is of growing economical importance to many nations, in particular for developing countries. Although tourism is an important economic vehicle for the host country, its continued growth has led to on-going concerns about its environmental sustainability. Coastal and marine tourism can directly affect the environment through direct and indirect tourist activities. For these reasons tourism sector needs practical actions of sustainability. Several studies have shown how education minimizes the impact on and is proactive for, preserving the natural resources. This paper evaluates the effectiveness of a citizen science program to improve the environmental education of the volunteers, by means of questionnaires provided to participants to a volunteer-based Red Sea coral reef monitoring program (STEproject). Fifteen multiple-choice questions evaluated the level of knowledge on the basic coral reef biology and ecology and the awareness on the impact of human behaviour on the environment. Volunteers filled in questionnaires twice, once at the beginning, before being involved in the project and again at the end of their stay, after several days participation in the program. We found that the participation in STEproject significantly increased both the knowledge of coral reef biology and ecology and the awareness of human behavioural impacts on the environment, but was more effective on the former. We also detected that tourists with a higher education level have a higher initial level of environmental education than less educated people and that the project was more effective on divers than snorkelers. This study has emphasized that citizen science projects have an important and effective educational value and has suggested that tourism and diving stakeholders should increase their commitment and efforts to these programs.

  1. Quality management status of national radiation environmental monitoring network and strategy for development

    International Nuclear Information System (INIS)

    Huang Renjie; Zhang Rongsuo; Ni Shiying; Shen Gang

    2009-01-01

    During the period of 10th five-year plan, MEP has constructed a national radiation environmental monitoring network. In the running of the network, quality management on monitoring data is of vital importance. So all the members of the radiation environmental monitoring network are required to ensure the quality of monitoring method, equipment, reagent,quality of personnel, data processing and information management and so on. Thus the monitoring result would be typical and accuracy in science. The article introduced in detail the quality management status of the National Radiation Environmental Monitoring Network and put forward the strategy for development from the institutionalized and large-scale point of view of radioactive environmental monitoring work. (authors)

  2. Monitor resultaten geluid 2000

    NARCIS (Netherlands)

    Jabben J; Potma CJM; Swart WJR; LLO

    2001-01-01

    As part of an enhanced effort in monitoring the environmental quality in 1999, the RIVM set up a noise monitoring programme. This programme forms part of the project, "Development of a monitoring system for noise and disturbance", which aims at establishing a number of permanent sites for monitoring

  3. Environmental effects monitoring for exploration drilling

    International Nuclear Information System (INIS)

    Buchanan, R.A.; Cook, J.A.; Mathieu, A.

    2003-01-01

    Strategies for monitoring the environmental effects of single exploratory offshore wells on the east coast of Canada were evaluated. The report was compiled from consultations with scientists, regulators and stakeholders as well as a review of regulatory regimes and toxicity results. The aim of the report was to develop a decision tree for determining when to conduct environmental effects monitoring (EEM). Respondents evinced lower levels of concern for single exploratory wells than for production developments. A number of scientists argued for full statistical treatment of all data, and many people argued that more assurance was needed that the marine environment was not being unduly harmed. Respondents also considered that biological effects should be a primary focus, rather than the occurrence of trace chemical signals, and that seabirds and mammals should be monitored. Concern was expressed over the value of data collected from monitoring the effects of exploratory drilling activities. It was suggested that local and site-specific issues should be considered in the design of EEM programs. Respondents expressed strong concern about potential cumulative effects with other industrial activities, and suggested that test cases should be established and monitored to develop a scientific rationale for the inclusion or exclusion of specific variables in future EEM programs. A decision tree was developed based on 3 scenarios: (1) compliance monitoring only in well known areas with no sensitive issues; opportunistic EEM surveys of sediments, benthos, seabirds and marine mammals in shallow or deep areas with no known sensitive issues; and (3) custom EEM surveys for sensitive areas. Currently, there are EEM requirements for drilling exploratory wells offshore Canada's east coast. 58 refs., 2 tabs., 7 figs

  4. Model project for the pollution investigation of a lake. The use of nuclear techniques for environmental risk assessment

    International Nuclear Information System (INIS)

    Goektepe, B. G.; Borak, F.; Fowler, S.; Yilmaz Erkol, A.

    2002-01-01

    Environmental pollution monitoring and the protection of water resources are vital in terms of public health and economical consequences for many of the countries. The use of nuclear and isotopic techniques for pollution investigation of water resources on the other hand has been gaining more importance during the recent years. In recognition of the serious pollution problems of the surface water resources; a large scope multidisciplinary environmental management project with short title 'Lake Project' which is designed and developed by the group of scientists at the Cekmece Nuclear Research and Training Center of the Turkish Atomic Energy Authority is presented. This multidisciplinary project has various important aspects; scientific, social, economic, educational, cultural and political. Specific problem a dressed was the serious pollution of Kucukcekmece Lake due to high population and industrial growth in the region as well as creation of public awareness on the peaceful activities of the Cekmece Nuclear Research Center. The main objective was to promote the use of nuclear and isotopic techniques in the assessment of local, national and regional environmental pollution control and management. The project implementation was carried out in two phases and supported by the International Atomic Energy Agency. Water, biota and sediment samples were collected from several sampling stations seasonally. Some of the results are presented in tables for natural radioactivity, chemical and physical parameters. The first phases of the project has provided tools and methods for identifying types and magnitudes of contaminants in the Kucukcekmece Lake. Results obtained from the model project show that the radioactivity pollution levels have no significance in terms of human health and ecosystem. However, major problem regarding lake and marine environmental management is identified as eutrophication. This is a process of water quality degradation caused by mainly by domestic

  5. The annual report on the environmental monitoring around the Ningyo-toge. 2005. Okayama

    International Nuclear Information System (INIS)

    Tago, Itaru; Ono, Takayuki; Kawasaki, Satoru

    2007-03-01

    The Ningyo-toge Environmental Engineering Center of the Japan Atomic Energy Agency performs the environmental monitoring around the Ningyo-toge and the waste rock sites according to the agreements with local governments, Okayama and Tottori prefectures. Environmental monitoring of plutonium has been also performed around the Ningyo-toge regarding the practical application study on the reprocessed uranium conversion, which was carried out from 1994 to 1999 at the Ningyo-toge. The prefectural committees on the environmental monitoring evaluate the monitoring data annually. This report summarized the results of the environmental monitoring mentioned above in the fiscal year 2005. The results show that the levels of the radiation and the radioactive concentrations in the environmental samples were within natural variations, and that the waste rock sites have been well maintained. The committees concluded the environmental impacts from the sites were negligible. (author)

  6. Discussion on the post-project assessment of environmental impact for nuclear facilities

    International Nuclear Information System (INIS)

    Shang Zhaorong

    2013-01-01

    The paper introduces the background of post-project assessment of environmental impact in the world and focuses on the characteristic of environmental impact assessment for Chinese nuclear facilities construction projects, analyzes the necessity, principle and contents of post-project assessment of environmental impact on current Chinese nuclear facilities operation. It is considered that to start the post-project assessment of environmental impact, perfect the post-project assessment mechanism, introduce the post-project assessment into environmental impact assessment system are just at the night time. (author)

  7. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  8. Manitoba Hydro long-term high-voltage transmission line magnetic field monitoring project

    International Nuclear Information System (INIS)

    Wong, P.S.; Ng, C.K.

    2008-01-01

    As part of the licensing process to construct a new 230 kV transmission line on an existing right-of-way in Manitoba, an electrical effects study was conducted in 1998. The study was part of the environmental assessment program crucial in obtaining government approval to construct the line. Some residents living adjacent to the new transmission circuit expressed concerns about alleged adverse health effects associated with long-term exposure to magnetic fields from high voltage transmission lines. In order to verify the accuracy of the predicted magnetic field levels submitted to the regulatory body in the the electrical effects study and to instill confidence in the residents of the affected communities, a three-year magnetic monitoring project was conducted between 2003 and 2005 along the right-of-way after the new 230kV transmission line was energized by Manitoba Hydro. This paper described the monitoring program, with reference to location; equipment; data analysis; and discussion of results. It was concluded that the long-term monitoring project demonstrated that the magnetic field prediction methodology was well understood and accurate, and provided valuable long-term magnetic field characteristics at the edge of the right-of-way. In addition, when there is opposition to a transmission line, public consultation and education were found to be the best options to arrive at a solution. 3 refs., 1 tab., 12 figs

  9. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  10. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  11. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-12-31

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls and Kesselring Sites and Site closure activities at the S1C Site (also known as the KAPL Windsor Site) continue to have no adverse effect on human health and the quality of the environment. The effluent and environmental monitoring programs conducted by KAPL at the Knolls and Kesselring Sites are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as environmental monitoring of air, water, sediment, and fish. Radiation measurements are also made around the perimeter of the Knolls and Kesselring Sites and at off-site background locations. The environmental monitoring program for the S1C Site continues to be reduced in scope from previous years due to the completion of Site dismantlement activities during 1999 and a return to green field conditions during 2000.

  12. Knolls Atomic Power Laboratory environmental monitoring report, calendar year 2001

    International Nuclear Information System (INIS)

    2002-01-01

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) Sites are summarized and assessed in this report. Operations at the Knolls and Kesselring Sites and Site closure activities at the S1C Site (also known as the KAPL Windsor Site) continue to have no adverse effect on human health and the quality of the environment. The effluent and environmental monitoring programs conducted by KAPL at the Knolls and Kesselring Sites are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as environmental monitoring of air, water, sediment, and fish. Radiation measurements are also made around the perimeter of the Knolls and Kesselring Sites and at off-site background locations. The environmental monitoring program for the S1C Site continues to be reduced in scope from previous years due to the completion of Site dismantlement activities during 1999 and a return to green field conditions during 2000

  13. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  14. Ground Control Point - Wireless System Network for UAV-based environmental monitoring applications

    Science.gov (United States)

    Mejia-Aguilar, Abraham

    2016-04-01

    In recent years, Unmanned Aerial Vehicles (UAV) have seen widespread civil applications including usage for survey and monitoring services in areas such as agriculture, construction and civil engineering, private surveillance and reconnaissance services and cultural heritage management. Most aerial monitoring services require the integration of information acquired during the flight (such as imagery) with ground-based information (such as GPS information or others) for improved ground truth validation. For example, to obtain an accurate 3D and Digital Elevation Model based on aerial imagery, it is necessary to include ground-based information of coordinate points, which are normally acquired with surveying methods based on Global Position Systems (GPS). However, GPS surveys are very time consuming and especially for longer time series of monitoring data repeated GPS surveys are necessary. In order to improve speed of data collection and integration, this work presents an autonomous system based on Waspmote technologies build on single nodes interlinked in a Wireless Sensor Network (WSN) star-topology for ground based information collection and later integration with surveying data obtained by UAV. Nodes are designed to be visible from the air, to resist extreme weather conditions with low-power consumption. Besides, nodes are equipped with GPS as well as Inertial Measurement Unit (IMU), accelerometer, temperature and soil moisture sensors and thus provide significant advantages in a broad range of applications for environmental monitoring. For our purpose, the WSN transmits the environmental data with 3G/GPRS to a database on a regular time basis. This project provides a detailed case study and implementation of a Ground Control Point System Network for UAV-based vegetation monitoring of dry mountain grassland in the Matsch valley, Italy.

  15. [Stanford Linear Accelerator Center] annual environmental monitoring report, January--December 1989

    International Nuclear Information System (INIS)

    1990-05-01

    This progress report discusses environmental monitoring activities at the Stanford Linear Accelerator Center for 1989. Topics include climate, site geology, site water usage, land use, demography, unusual events or releases, radioactive and nonradioactive releases, compliance summary, environmental nonradiological program information, environmental radiological program information, groundwater protection monitoring ad quality assurance. 5 figs., 7 tabs

  16. Discussion on the environmental protection acceptance method and the critical issues of the completion of projects about radiation usage in the hospitals

    International Nuclear Information System (INIS)

    Wang Wei

    2014-01-01

    It is widely used in the world that the hospitals take advantages of radiation technology. Practically it is involved radioactive isotope, sealed source and the usage of ray device. Based on the environmental protection acceptance of the finished projects, this article is aimed at the actual characteristics of the medical practice and differentiating the major factors of environmental effects, choosing the monitoring criteria and method of environmental protection acceptance and exploring the critical issues in the course of acceptance. Finally this essay is intended to provide theory evidence and technical support in the acceptance of the above projects. (author)

  17. Thermoluminescence dosimetry environmental monitoring system

    International Nuclear Information System (INIS)

    Bortoluzzi, S.

    1989-01-01

    In this report, characteristics and performances of an environmental monitoring system with thermoluminescence dosimetry are presented. Most of the work deals with the main physical parameters necessary for measurements of ambiental dose. At the end of this report some of level doses in the environment around the site of the ENEA Center of Energy Research Salluggia (Italy) are illustrated

  18. Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas, calendar year 1991

    International Nuclear Information System (INIS)

    Chaloud, D.J.; Dicey, B.B.; Mullen, A.A.; Neale, A.C.; Sparks, A.R.; Fontana, C.A.; Carroll, L.D.; Phillips, W.G.; Smith, D.D.; Thome, D.J.

    1992-01-01

    This report describes the Offsite Radiation Safety Program conducted during 1991 by the Environmental Protection Agency's (EPA's) Environmental Monitoring Systems Laboratory-Las Vegas. This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ion chambers (PICs); and by biological monitoring of animals, food crops, and humans. Personnel with mobile monitoring equipment are placed in areas downwind from the test site prior to each nuclear weapons test to implement protective actions, provide immediate radiation monitoring, and obtain environmental samples rapidly after any occurrence of radioactivity release. Comparison of the measurements and sample analysis results with background levels and with appropriate standards and regulations indicated that there was no radioactivity detected offsite by the various EPA monitoring networks and no exposure above natural background to the population living in the vicinity of the NTS that could be attributed to current NTS activities. Annual and long-term trends were evaluated in the Noble Gas, Tritium, Milk Surveillance, Biomonitoring, TLD, PIC networks, and the Long-Term Hydrological Monitoring Program

  19. Knolls Atomic Power Laboratory annual environmental monitoring report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) sites are summarized and assessed in this report. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each site and at off-site background locations.

  20. Knolls Atomic Power Laboratory annual environmental monitoring report, calendar year 1997

    International Nuclear Information System (INIS)

    1997-01-01

    The results of the effluent and environmental monitoring programs at the three Knolls Atomic Power Laboratory (KAPL) sites are summarized and assessed in this report. The effluent and environmental monitoring programs conducted by KAPL are designed to determine the effectiveness of treatment and control methods, to provide measurement of the concentrations in effluents for comparison with applicable standards, and to assess resultant concentrations in the environment. The monitoring programs include analyses of samples of liquid and gaseous effluents for chemical constituents and radioactivity as well as monitoring of environmental air, water, sediment, and fish. Radiation measurements are also made around the perimeter of each site and at off-site background locations

  1. Environmental monitoring for EG and G Idaho facilities at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Tkachyk, J.W.; Wright, K.C.; Wilhelmsen, R.N.

    1990-08-01

    This report describes the 1989 environmental-monitoring activities of the Environmental Monitoring Unit of EG ampersand G Idaho, Inc., at EG ampersand G-operated facilities at the Idaho National Engineering Laboratory (INEL). The major facilities monitored include the Radioactive Waste Management Complex, the Waste Experimental Reduction Facility, the Mixed Waste Storage Facility, and two surplus facilities. Additional monitoring activities performed by Environmental Monitoring are also discussed, including drinking-water monitoring and nonradiological liquid-effluent monitoring, as well as data management. The primary purposes of monitoring are to evaluate environmental conditions and to provide and interpret data, in compliance with applicable regulations, to ensure protection of human health and the environment. This report compares 1989 environmental-monitoring data with derived concentration guides and with data from previous years. This report also presents results of sampling performed by the Radiological and Environmental Sciences Laboratory and by the United States Geological Survey. 17 refs., 49 figs., 11 tabs

  2. The environmental monitoring of Cultural Heritage through Low Cost strategies: The frescoes of the crypt of St. Francesco d'Assisi's, Irsina (Basilicata, Southern Italy)

    Science.gov (United States)

    Sileo, Maria; Gizzi, Fabrizio; Masini, Nicola

    2015-04-01

    One of the main tools of assessment and diagnosis used to define appropriate strategies for the preservation of cultural heritage is the environmental monitoring. To achieve an environmental monitoring are needed high costs of purchase and maintenance, high costs of instrumental and for the management of the plants and processing of results. These costs imply that the technologies for environmental monitoring are not as common but their use is limited to the study very famous monuments or sites. To extend the use and dissemination of such technologies to a greater number of monuments, through the project Pro_Cult (Advanced methodological approaches and technologies for Protection and Security of Cultural Heritage) a research aimed at testing low cost technologies has been performed. The aim of the research is to develop low cost monitoring systems, assessing their effectiveness in a comparative way with commercial high cost ones. To this aim an environmental monitoring system using the Arduino system was designed and developed. It is an electronics prototyping platform based on open-source hardware and software flexible and user friendly. This system is connected to sensors for the detection of environmental parameters of non high purchase cost but with respect to the medium potential detection sensors accurately. This low cost system was tested in the framework of a microclimate monitoring project of the crypt of St. Francis of Assisi in Irsina (Southern Italy) enriched by a precious cycle of medieval frescoes. The aim of this research was to compare two monitoring systems, the first, at low cost, using Arduino system, and the second, a standard commercial product for a full yearly cycle and assess the reliability and the results obtained by the two systems. This paper shows the results of the comparative analysis of an entire monitoring yearly cycle in relation to the problems of degradation affecting the paintings of medieval crypt [1]. The obtained results

  3. Methodology to analyze environmental monitoring reports of desalination plants; Metodologia para el analisis de los documentos de seguimiento ambiental de las instalaciones desaladoras de agua marina

    Energy Technology Data Exchange (ETDEWEB)

    Ruis Arriaga, S.; Orozco Conti, F.; Ubaldi Freda, G. M.; Garau Hernandez, F.; Salguero Martinez, J.; Garcia Sanchez-Colomer, M.

    2010-07-01

    In this paper we propose a methodology, based on check lists, to analyze the shape and the contents of the environmental vigilance programmes and the monitoring reports related to projects of desalination plants subjects to environmental impact assessment. The aim is to obtain useful and reproducible analysis tool for detect possible faults in the environmental monitoring reports. The application of this methodology leeds up to simplify and speed up the checking of these documents by competent authority. (Author) 6 refs.

  4. FIBER OPTIC SENSORS FOR ENVIRONMENTAL MONITORING

    Science.gov (United States)

    Due to decades of neglect as well as ever-increasing industrial activity, environmental monitoring has become an important issue. Given the expense and time constraints associated with classical laboratory analysis, there exists a growing interest in cost-effective and real-time ...

  5. Monitoring of the radiological environmental impact of the AREVA site of Tricastin

    International Nuclear Information System (INIS)

    Mercat, C.; Brun, F.; Florens, P.; Petit, J.; Garnier, F.; Devin, P.

    2010-01-01

    Set up at the beginning of the site's operations, in 1962, the monitoring of the radiological environmental impact of the AREVA site of Tricastin has evolved over time to meet more specifically the multiple objectives of environmental monitoring: to prove the respect of the commitments required by the authorities, to be able to detect a dysfunction in the observed levels, to enable the assessment of impacts of industrial activities, to ensure the balance between environmental quality and the use made by the local population and to inform the public of the radiological state of the environment. Thousands of data were acquired on the radioactivity of all environmental compartments as well as on the functioning of local ecosystems. Today, the Network of Environmental Monitoring of AREVA Tricastin goes beyond the requirements of routine monitoring to provide innovative solutions for monitoring the radioactivity (especially for uranium) in the environment. (author)

  6. National Environmental Radiation Warning And Monitoring Network And Proposed Radiation Monitoring Programme For The 1st Nuclear Power Plant Ninth Thuan

    International Nuclear Information System (INIS)

    Vuong Thu Bac

    2011-01-01

    National Environmental Radiation Warning and Monitoring Network has been gradually setting up based on some of legislative documents which have been issued in recent years. Studies and surveys to build an environmental radiation monitoring program for nuclear power plant (NPP) have also been implemented. This paper aims to introduce National Environmental Radiation Warning and Monitoring Network in Vietnam which has been approved by the government, the draft program for environmental radiation monitoring Ninh Thuan NPP and some initial results of research about environmental radiation in the planning area for building first NPP in Vietnam. (author)

  7. Environmental monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of the EMMP is: to identify, in consultation with the affected states and Indian tribes, potentially significant adverse environmental impacts that could result from site characterization activities, to describe data collection methods that will be used to monitor any such identified impacts, and procedures for mitigating them. Chapter 2 of the EMMP provides an overview of the background and scope of the document. Chapter 3 of the EMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construct the exploratory shafts and surface support facilities. The rationale for developing environmental monitoring studies is presented in Chapeter 4. Chapter 5 contains descriptions of the environmental monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the EMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 21 figs., 10 tabs

  8. Environmental information system and odour monitoring based on citizen and technology innovative sensors

    International Nuclear Information System (INIS)

    Ledent, Philippe; Stevenot, Bernard; Delva, Julien

    2013-01-01

    The challenge is the integration of citizens as ''community-based'' observation providers, giving the odour perception and discomfort and getting feed-back in real time from a learning monitoring system. The level of annoyance depends on how odours are emitted and in what intensity, their dispersion under ambient atmospheric conditions and finally on citizens' exposure and perception. The Environmental Information System and Odour Monitoring developed in the project OMNISCIENTIS funded by the EU brings together state of the art technologies and open communication capabilities in order to mitigate odour annoyance. The project allows for citizen feedback, deepens knowledge on odour measurement and management and aims to support harmonised legislation at EU level. Moreover the project results can provide savings to industries. The core is an information system allowing inhabitants to serve as human sensors, acting according to sociological patterns, which influence odour perception, discomfort and nuisance. It provides a dedicated tool to consider odour acceptability, based on a community-based opinion. Due to the subjective nature of odour perception, odour monitoring and fast modelling is used to assist and adjust the information citizens provide via Smartphone and obtained by e-nose and modelling. Innovative in-situ sensors are improved to monitor ambient odour exposures. A specific odour dispersion model system is developed to obtain interrelated spatial odour exposure levels. This fast and innovative model system helps us to evaluate the performance of measures taken at the very moment odours are emitted and with respect to the way in which these occur. The Living Lab approach ensures stakeholder involvement, citizens' participation in decision-making and supports dissemination activities. The results are conveyed to stakeholders and general public. (orig.)

  9. Environmental Monitoring and Assessment Program (EMAP) National Coastal Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Environmental Monitoring and Assessment Program (EMAP) National Coastal Database contains estuarine and coastal data that EMAP and Regional-EMAP have collected...

  10. Use of software in the Cuban environmental monitoring

    International Nuclear Information System (INIS)

    Alonso Abad, Dolores; Dominguez Ley, Orlando; Ramos Viltre, Enma O.; Caveda Ramos, Celia; Molina Perez, Daniel; Capote Ferrara, Eduardo; Dominguez Garcia, Adriel; Grinan Torres, Reinaldo

    2008-01-01

    The work group of the National Network of Environmental Radiological Surveillance (NNERS) of the Republic of Cuba offers services which can be divided into two main domains: Services for Environmental Radiological Surveillance and Services for Measuring Radioactivity in Scraps. As part of this work a National Monitoring System has been put into place. Such monitoring system generates a great volume of information which needs to be evaluated, processed, controlled and efficiently stored. To face this challenge in 2002 the National Network started two investigation projects in order to automate some of its services. In this work, we briefly present five software designed to improve the quality of the services offered by the NNERS. We also give a short description of the main results obtained with the use of these tools. The automatization of the measurements for some indicators and the development of technical methods for the interpretation of the results have significantly improved the operational capabilities for the national network. For instance, it has also made possible to carry out studies to characterize radiologically the posts of the network. The improvement of the radiological control of the scrap has diminished the risk of exposure to radiation and the risk of pollution due to the fusion of radioactive sources. The use these software has not only increased technical efficiency of the network, but it has also had a very important social impact. Indeed, the main advantage of such automatization is that it increases the capacity for giving an early response in case of a radiological emergency what redounds in an increased safety for the population and the environment. (author)

  11. Citizen involvement in sustainability-centred environmental assessment follow-up

    International Nuclear Information System (INIS)

    Hunsberger, Carol A.; Gibson, Robert B.; Wismer, Susan K.

    2005-01-01

    In Canada, many project proponents and planners in the public and private sectors are required to forecast and minimize the adverse environmental effects of their undertakings. However, environmental assessments have traditionally been weak in the areas of planning and conducting effective monitoring, encouraging public participation, integrating social and ecological considerations, encouraging environmental rehabilitation and enhancement, and examining cumulative effects of multiple projects. This paper attempts to address these deficiencies together by drawing from theory and practice in citizen-based monitoring, in the interests of sustainable livelihoods, using local knowledge. Informed by case study research in several regions of Canada, the discussion focuses on opportunities for using citizen-based approaches to broad and continuing regional monitoring as a foundation for the project-centred work that is the usual concern of environmental assessment follow-up. Such approaches have advantages beyond the usual expectations of project-centred monitoring and beyond the conventional arguments for increasing local involvement in environmental assessments. However, there are also challenges including those of integrating local and conventional (or scientific) knowledge systems, addressing concerns about the credibility and biases of citizens and project proponents, ensuring attention to broader sustainability goals such as increased stewardship and civility, and developing practical ways of coordinating and funding integrated and participatory monitoring programs. The concluding recommendations call for a dramatically different approach to follow-up activities on the part of private and public project proponents, as well as novel thinking for environmental assessment practitioners

  12. Environmental monitoring in emergency situations

    International Nuclear Information System (INIS)

    1966-01-01

    This manual gives technical guidance on emergency monitoring procedures to those who would have to assess the situation after an accident leading to the uncontrolled release of radioactive substances to the environment. Its aim is to draw attention to the important factors that should be considered in formulating emergency plans. The seven annexes contain inventories of fission products and possible releases; dispersion, deposition and dose-exposure relationships for airborne releases; α-, β- and γ-radiation surveys; information on sample collection and field evaluation; and brief descriptions of the environmental monitoring procedures adopted in previous emergencies (Windscale 1957, AERE Harwell 1961 and NRTS Idaho 1961).

  13. Environmental Monitoring at the Savannah River Plant, Annual Report - 1981

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, C.

    2001-07-26

    An environmental monitoring program has been in existence at SRP since 1951. The original preoperational surveys have evolved into an extensive environmental monitoring program in which sample types from approximately 500 locations are analyzed for radiological and/or nonradiological parameters. The results of these analyses for 1981 are presented in this report.

  14. An Innovative Unmanned System for Advanced Environmental Monitoring: Design and Development

    Science.gov (United States)

    Marsella, Ennio; Giordano, Laura; Evangelista, Lorenza; Iengo, Antonio; di Filippo, Alessandro; Coppola, Aniello

    2015-04-01

    The paper summarizes the design and development of a new technology and tools for real-time coordination and control of unmanned vehicles for advanced environmental monitoring. A new Unmanned System has been developed at Institute for Coastal Marine Environmental - National Research Council (Italy), in the framework of two National Operational Programs (PON): Technological Platform for Geophysical and Environmental Marine Survey-PITAM and Integrated Systems and Technologies for Geophysical and Environmental Monitoring in coastal-marine areas-STIGEAC. In particular, the system includes one Unmanned Aerial Vehicle (UAV) and two Unmanned Marine Vehicles (UMV). Major innovations concern the implementation of a new architecture to control each drone and/or to allow the cooperation between heterogeneous vehicles, the integration of distributed sensing techniques and real-time image processing capabilities. Part of the research in these projects involves, therefore, an architecture, where the ground operator can communicate with the Unmanned Vehicles at various levels of abstraction using pointing devices and video viewing. In detail, a Ground Control Station (GCS) has been design and developed to allow the government in security of the drones within a distance up to twenty kilometers for air explorations and within ten nautical miles for marine activities. The Ground Control Station has the following features: 1. hardware / software system for the definition of the mission profiles; 3. autonomous and semi-autonomous control system by remote control (joystick or other) for the UAV and UMVs; 4. integrated control system with comprehensive visualization capabilities, monitoring and archiving of real-time data acquired from scientific payload; 5. open structure to future additions of systems, sensors and / or additional vehicles. In detail, the UAV architecture is a dual-rotor, with an endurance ranging from 55 to 200 minutes, depending on payload weight (maximum 26 kg) and

  15. Environmental, political, and economic determinants of water quality monitoring in Europe

    Science.gov (United States)

    Beck, Lucas; Bernauer, Thomas; Kalbhenn, Anna

    2010-11-01

    Effective monitoring is essential for effective pollution control in national and international water systems. To what extent are countries' monitoring choices driven by environmental criteria, as they should be? And to what extent are they also influenced by other factors, such as political and economic conditions? To address these questions, we describe and explain the evolution of one of the most important international environmental monitoring networks in Europe, the one for water quality, in the time period 1965-2004. We develop a geographic information system that contains information on the location of several thousand active monitoring stations in Europe. Using multivariate statistics, we then examine whether and to what extent the spatial and temporal clustering of monitoring intensity is driven by environmental, political, and economic factors. The results show that monitoring intensity is higher in river basins exposed to greater environmental pressure. However, political and economic factors also play a strong role in monitoring decisions: democracy, income, and peer pressure are conducive to monitoring intensity, and monitoring intensity generally increases over time. Moreover, even though monitoring is more intense in international upstream-downstream settings, we observe only a weak bias toward more monitoring downstream of international borders. In contrast, negative effects of European Union (EU) membership and runup to the EU's Water Framework Directive are potential reasons for concern. Our results strongly suggest that international coordination and standardization of water quality monitoring should be intensified. It will be interesting to apply our analytical approach also to other national and international monitoring networks, for instance, the U.S. National Water-Quality Assessment Program or the European Monitoring and Evaluation Program for air pollution.

  16. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  17. An IoT Project for Vital Signs Monitoring

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2017-01-01

    Full Text Available Nowadays, the Internet of Things (IoT projects are very popular and they are developed for numerous fields. In order to detect various medical problems on time, it is required to monitor the subjects either human or non-human. This could be used on regular or specific activities, like sport or work. It is necessary to determine the factors that could lead to medical problems. Another important aspect is to quantify the factors, to monitor them, to collect data and to make the proper interpretation. This could be achieved using dedicated sensors, controlled by an application embedded on a development board. When a dangerous value is reached, the system has to inform the subject (if human or someone else (if non-human. This paper presents an Arduino based IoT project used for monitoring the vital signs for human and non-human and the results based on its usage. The paper details the hardware and software components of this project.

  18. Annual environmental monitoring report of the Lawrence Berkeley Laboratory, 1986

    International Nuclear Information System (INIS)

    Schleimer, G.E.

    1987-04-01

    The Environmental Monitoring Program of the Lawrence Berkeley Laboratory is described. Data for 1986 are presented and general trends are discussed. Topics include radiation monitoring, wastewater discharge monitoring, dose distribution estimates, and ground water monitoring. 9 refs., 8 figs., 20 tabs

  19. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  20. Environmental radioactivity survey in Andong area

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, Zi Hong; Jo, Kum Ju [Andong Regional Radioactivity Monitoring Station, Andong National Univ., Andong (Korea, Republic of)

    2001-12-15

    The objectives of the project are to monitor an abnormal level in Andong area and to provide a base-line data on environmental radiation/radioactivity levels in case of any radiological emergency situation. The project is important in view of protecting the public health from the potential hazards of radiation and keeping up the clean environment. This report summarizes and interprets environmental radiation/radioactivity monitoring samples Gamma exposure rates, airborne dust, precipitation, fall-out and drinking-water. Environmental samples : vegetables, fishes/shellfishes, fruits, starch and starch roots and drinking waters. Among the all 2001 radiological monitoring and environmental data in Andong area were not found the extraordinary data. And a nation-wide environmental radiation/radioactivity level survey results were all background levels attributed to terrestrial and cosmic radiation.

  1. Environmental auditing for oil drilling projects

    International Nuclear Information System (INIS)

    Zambrano Solarte, Hugo Ibsen; Olaya Amaya, Alfredo

    2003-01-01

    The enforcement of legal regulations on the environment requires some mechanisms related to preservation and conservation of natural resources, as well as paleontological and archaeological wealth, in order to allow their use without endangering their integrity. This article reviews legal regulations, activities and performance indicators, which should be taken into account by Environmental Auditors in oil projects. Additionally, a Plan for Environmental management is analyzed with its main components and procedures for performing the environmental auditing

  2. Monitoring the effectiveness evaluation of investment projects

    Directory of Open Access Journals (Sweden)

    Skopin Alex O.

    2012-02-01

    Full Text Available The article raised the question of monitoring regulatory evaluation of the effectiveness of regional investment projects. This is justified by the fact that the current regulatory framework defined indicators for measuring the effectiveness of regional investment projects, but these figures are usually used only at the design stage of the project, an interim assessment of the effectiveness of a sufficiently simplified and based on the level of exploration investment.

  3. Involvement of local stakeholders in the development of new information schemes for the displaying of environmental radiological monitoring results

    International Nuclear Information System (INIS)

    Rollinger, Francoise; Lebeau, Audrey; Petitfrere, Michael; Eimer, Michel; Ganay, Claude de; Gadbois, Serge; Leprieur, Fabrice; Vaillant, Ludovic

    2008-01-01

    Evolution of radionuclides concentration in the environment and associated potential health impacts are key and legitimate questions for the population living around nuclear facilities. In spite of the efforts from authorities, public experts and operators to make this information available and understandable, mainly through Local Liaison Committees (LLC), the way it is usually formalized makes it difficult to meet non-expert expectations. In this context, the IRSN launched a pilot project in the Loire Valley to define new schemes for the displaying of this information. This project brings together representatives from LLCs - local elected people, trade unions and environmental NGOs -, experts from the IRSN - environment and radiation protection departments - and facilitators - CEPN and MUTADIS -. Its objectives are: 1-) To identify all nuclear facilities and producers of measurements in the environment within the Valley; 2-) To clearly define local population expectations regards environmental radiological survey; 3-) To select adequate measurements values and presentational schemes; 4-) To provide recommendations regarding the environment monitoring strategy. This project is also connected with the French national measurement network. Within this national network, the IRSN is in charge of developing a database that brings together all the results from environmental radiological monitoring, in order to provide all these data to the population, including elements about impacts on human health. This network will take advantage of the work achieved within the pilot project. The facilitation process mainly consisted in fostering relations of trust (notably with the preparation of detailed minutes of the project meetings), and supporting both local stakeholders and IRSN experts in the project management and the development of a common language at the crossroad between scientific and technical knowledge and local actors' understanding of their own environment. This

  4. Nanophotonic label-free biosensors for environmental monitoring.

    Science.gov (United States)

    Chocarro-Ruiz, Blanca; Fernández-Gavela, Adrián; Herranz, Sonia; Lechuga, Laura M

    2017-06-01

    The field of environmental monitoring has experienced a substantial progress in the last years but still the on-site control of contaminants is an elusive problem. In addition, the growing number of pollutant sources is accompanied by an increasing need of having efficient early warning systems. Several years ago biosensor devices emerged as promising environmental monitoring tools, but their level of miniaturization and their fully operation outside the laboratory prevented their use on-site. In the last period, nanophotonic biosensors based on evanescent sensing have emerged as an outstanding choice for portable point-of-care diagnosis thanks to their capability, among others, of miniaturization, multiplexing, label-free detection and integration in lab-on-chip platforms. This review covers the most relevant nanophotonic biosensors which have been proposed (including interferometric waveguides, grating-couplers, microcavity resonators, photonic crystals and localized surface plasmon resonance sensors) and their recent application for environmental surveillance. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. Use Of The Operational Air Quality Monitor (AQM) For In-Flight Water Testing Project

    Science.gov (United States)

    Macatangay, Ariel

    2014-01-01

    A primary requirement for manned spaceflight is Environmental Health which ensures air and water contaminants, acoustic profiles, microbial flora, and radiation exposures within the cabin are maintained to levels needed for crew health and for vehicle system functionality. The reliance on ground analyses of returned samples is a limitation in the current environmental monitoring strategy that will prevent future Exploration missions beyond low-Earth orbit. This proposal attempts to address this shortcoming by advancing in-flight analyses of water and air. Ground analysis of in-flight, air and water samples typically employ vapor-phase analysis by gas chromatography-mass spectrometry (GC-MS) to identify and quantify organic compounds present in the samples. We envision the use of newly-developed direct ionization approaches as the most viable avenue leading towards an integrated analytical platform for the monitoring of water, air, and, potentially bio-samples in the cabin environment. Development of an in-flight instrument capable of analyzing air and water samples would be the logical next step to meeting the environmental monitoring needs of Exploration missions. Currently, the Air Quality Monitor (AQM) on-board ISS provides this specific information for a number of target compounds in the air. However, there is a significant subset of common target compounds between air and water. Naturally, the following question arises, "Can the AQM be used for both air and water quality monitoring?" Previous directorate-level IR&D funding led to the development of a water sample introduction method for mass spectrometry using electrothermal vaporization (ETV). This project will focus on the integration of the ETV with a ground-based AQM. The capabilities of this integrated platform will be evaluated using a subset of toxicologically important compounds.

  6. Environmental DNA for wildlife biology and biodiversity monitoring

    DEFF Research Database (Denmark)

    Bohmann, Kristine; Evans, Alice; Gilbert, M. Thomas P.

    2014-01-01

    Extraction and identification of DNA from an environmental sample has proven noteworthy recently in detecting and monitoring not only common species, but also those that are endangered, invasive, or elusive. Particular attributes of so-called environmental DNA (eDNA) analysis render it a potent t...

  7. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  8. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  9. Environmental radiation monitoring around Korea nuclear fuel company

    International Nuclear Information System (INIS)

    Choi, Yong Ho; Lee, C. W.; Choi, G. S.

    2004-12-01

    The environmental monitoring program for Korea Nuclear Fuel Company (KNFC) was implemented to investigate environmental radiation and radioactivity levels around the facilities. Accumulated environmental radiation doses were measured to be on almost the same level as those measured in the previous years. Total alpha and beta concentrations in air particulates were also similar to the past measurements. The concentrations of uranium isotopes in soil and underground water were investigated to be similar to natural levels. The concentrations of uranium isotopes in sediment around the facilities were not significantly different from those for the reference site. Surface water around the facilities showed somewhat higher uranium isotope concentrations than the reference samples but the activity levels were not much different from those reported before. The concentrations of uranium isotopes in rain water and foodstuffs such as rice seeds and Chinese cabbage were, on the whole, in the ranges of the previously reported levels. Based on the present results of the environmental monitoring, it can be estimated that the environmental impact resulting from the operation of KNFC in 2004 is negligible

  10. Environmental monitoring at the Savannah River Plant. Annual report, 1976

    International Nuclear Information System (INIS)

    Ashley, C.; Zeigler, C.C.

    1978-03-01

    The environmental monitoring program at the Savannah River Plant (SRP) provides reliable measurement of radioactive materials released at the source (approximately 40 locations) and present in the environment (approximately 500 locations). In recent years, water-quality testing and analysis have become an essential part of the environmental monitoring program. Aqueous discharges to plant streams are monitored for nonradioactive materials by chemical analyses of water sampled in flowing streams (approximately 25 locations). A brief discussion of plant releases to the environment and radioactive and nonradioactive materials detected in the environment are presented. The appendices contain data analysis and quality control information, sensitivities of laboratory analyses, tables of environmental sample analyses, and maps of sampling locations

  11. Joint sampling programme-Verification of data obtained in environmental monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Lauria, D.C. [Instituto de Radioprotecao e Dosimetria, Comissao Nacional de Energia Nuclear, Av. Salvador Allende s/no., CEP 22780-160, Rio de Janeiro, RJ (Brazil)], E-mail: dejanira@ird.gov.br; Martins, N.S.F.; Vasconcellos, M.L.H.; Zenaro, R.; Peres, S.S.; Pires do Rio, M.A. [Instituto de Radioprotecao e Dosimetria, Comissao Nacional de Energia Nuclear, Av. Salvador Allende s/no., CEP 22780-160, Rio de Janeiro, RJ (Brazil)

    2008-11-15

    The objective of the Environmental Radiological Monitoring Control programme carried out by the Institute of Radiation Protection and Dosimetry (IRD) in Brazil is to verify the licensee's compliance with the requirements for environmental monitoring of Brazilian facilities. The Joint Sampling Programme (JSP) is just one part of the control programme. In order to verify that the data reported by the licensees is representative and legitimate, this programme verifies sampling procedures, accuracy and precision of the data and the changes in the environmental conditions. This paper discusses the main findings of this programme that allowed IRD to optimize its available resources to control the monitoring of the eight facilities in Brazil.

  12. Environmental Monitors on Lobster Traps Database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The eMOLT project is a non-profit collaboration of industry, science, and academics devoted to monitoring of the physical environment of the Gulf of Maine and the...

  13. Pre operational background radiation monitoring around Kudankulam Nuclear Power Project site - a decade long experience

    International Nuclear Information System (INIS)

    Vijayakumar, B.; George, Thomas; Sundara Rajan, P.; Selvi, B.S.; Balamurugan, M.; Pandit, G.G.; Ravi, P.M.; Tripathi, R.M.

    2014-01-01

    Pre-operational environmental background radiation monitoring around nuclear power plants is very important to understand baseline values existing in the site and also to identify any hot spots of naturally occurring high background radiation areas and their sources. These baseline measurements will act as a benchmark for future comparison after the reactors go into operation. The radiation measurements are continued during the operational phase of the plant and the results are compared to see whether there is any impact of the operation of the plant on the environment. A comprehensive background radiation monitoring plan has been in vogue at site from 2004 to meet this objective. This paper describes the different monitoring strategies adopted around Kudankulam Nuclear Power Project site and throws light on the pre operational background radiation levels in the environment

  14. U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA) ENVIRONMENTAL TECHNOLOGY VERIFICATION (ETV) PROGRAM: ARSENIC MONITORING TECHNOLOGIES

    Science.gov (United States)

    The U.S. Environmental Protection Agency Environmental Technology Verification (ETV) program evaluates the performance of innovative air, water, pollution prevention and monitoring technologies that have the potential to improve human health and the environment. This technology ...

  15. Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas, calendar year 1991

    Energy Technology Data Exchange (ETDEWEB)

    Chaloud, D.J.; Dicey, B.B.; Mullen, A.A.; Neale, A.C.; Sparks, A.R.; Fontana, C.A.; Carroll, L.D.; Phillips, W.G.; Smith, D.D.; Thome, D.J.

    1992-01-01

    This report describes the Offsite Radiation Safety Program conducted during 1991 by the Environmental Protection Agency`s (EPA`s) Environmental Monitoring Systems Laboratory-Las Vegas. This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ion chambers (PICs); and by biological monitoring of animals, food crops, and humans. Personnel with mobile monitoring equipment are placed in areas downwind from the test site prior to each nuclear weapons test to implement protective actions, provide immediate radiation monitoring, and obtain environmental samples rapidly after any occurrence of radioactivity release. Comparison of the measurements and sample analysis results with background levels and with appropriate standards and regulations indicated that there was no radioactivity detected offsite by the various EPA monitoring networks and no exposure above natural background to the population living in the vicinity of the NTS that could be attributed to current NTS activities. Annual and long-term trends were evaluated in the Noble Gas, Tritium, Milk Surveillance, Biomonitoring, TLD, PIC networks, and the Long-Term Hydrological Monitoring Program.

  16. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    International Nuclear Information System (INIS)

    Williams, C.V.; Burford, T.D.

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  17. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  18. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  19. Environmental Monitoring Curriculum System and Application-Oriented Training

    Science.gov (United States)

    Wang, Jing-Ping; Wang, Xin-Hong

    2016-01-01

    Through building the environmental monitoring curriculum system for application-oriented talents, the comprehensive design and practice were constructed from the syllabus, textbooks, web-based courses, top-quality courses, test paper bank, open laboratory and scientific research etc. The aims are to promote environmental science professional,…

  20. The role of digital data entry in participatory environmental monitoring.

    Science.gov (United States)

    Brammer, Jeremy R; Brunet, Nicolas D; Burton, A Cole; Cuerrier, Alain; Danielsen, Finn; Dewan, Kanwaljeet; Herrmann, Thora Martina; Jackson, Micha V; Kennett, Rod; Larocque, Guillaume; Mulrennan, Monica; Pratihast, Arun Kumar; Saint-Arnaud, Marie; Scott, Colin; Humphries, Murray M

    2016-12-01

    Many argue that monitoring conducted exclusively by scientists is insufficient to address ongoing environmental challenges. One solution entails the use of mobile digital devices in participatory monitoring (PM) programs. But how digital data entry affects programs with varying levels of stakeholder participation, from nonscientists collecting field data to nonscientists administering every step of a monitoring program, remains unclear. We reviewed the successes, in terms of management interventions and sustainability, of 107 monitoring programs described in the literature (hereafter programs) and compared these with case studies from our PM experiences in Australia, Canada, Ethiopia, Ghana, Greenland, and Vietnam (hereafter cases). Our literature review showed that participatory programs were less likely to use digital devices, and 2 of our 3 more participatory cases were also slow to adopt digital data entry. Programs that were participatory and used digital devices were more likely to report management actions, which was consistent with cases in Ethiopia, Greenland, and Australia. Programs engaging volunteers were more frequently reported as ongoing, but those involving digital data entry were less often sustained when data collectors were volunteers. For the Vietnamese and Canadian cases, sustainability was undermined by a mismatch in stakeholder objectives. In the Ghanaian case, complex field protocols diminished monitoring sustainability. Innovative technologies attract interest, but the foundation of effective participatory adaptive monitoring depends more on collaboratively defined questions, objectives, conceptual models, and monitoring approaches. When this foundation is built through effective partnerships, digital data entry can enable the collection of more data of higher quality. Without this foundation, or when implemented ineffectively or unnecessarily, digital data entry can be an additional expense that distracts from core monitoring objectives